{"rows":20,"os":"0","page":"1","total":"15","procnotices":[{"id":"OP00400524","notice_type":"Request for Expression of Interest","noticedate":"13-Oct-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-10-28T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Uzbekistan","project_id":"P170206","project_name":"Modernizing Uzbekistan National Innovation System Project","bid_reference_no":"MUNIS/CS/CQS/32","bid_description":"Consultancy Services for develop and implement Information System of Management Scientific and Technical Laboratories","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"City: Tashkent, postal code: 100174, Street University w/n\nFloor / room number: 4th floor, room 414","contact_ctry_name":"Uzbekistan","contact_email":"munis.project.uz@gmail.com","contact_name":"Dilshodbek Azgarov","contact_organization":"Agency for Innovative Development","contact_phone_no":"+998971706784","contact_web_url":"www.wbgrants.uz","submission_date":"2025-10-13T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST FOR CONSULTING FIRMS</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Country</strong>: Uzbekistan</p>\n\n<p><strong>Project name:</strong> &ldquo;Modernizing Uzbekistan National Innovation System&rdquo; Project</p>\n\n<p><strong>Credit No.</strong><strong>: </strong>IDA-67840</p>\n\n<p><strong>Assignment Title:&nbsp;</strong>Consultancy Services for develop and implement Information System of Management Scientific and Technical Laboratories.</p>\n\n<p><strong>Reference No.:</strong> MUNIS/CS/CQS/32.</p>\n\n<p>&nbsp;</p>\n\n<p>The Republic of Uzbekistan has received a credit from International Development Association (IDA) toward the cost of the &ldquo;Modernizing Uzbekistan National Innovation System (MUNIS)&rdquo; Project, and intends to apply part of the proceeds for Consultancy Services for develop and implement Information System of Management Scientific and Technical Laboratories.</p>\n\n<p>&nbsp;</p>\n\n<p>The Project Implementation Unit under the Agency for Innovative Development now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>REQUIRED QUALIFICATIONS AND FRAMEWORK FOR EVALUATION (EVALUATION CRITERIA)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>The Consulting Firm will be selected in accordance with the Consulting Firm&rsquo;s qualifications based selection (CQS) Methodology, according to the Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; Procurement of Consulting Services is carried out in accordance with the Procurement Manual of Procurement Regulations for IPF Projects (2016) revised and updated September 2023 (&ldquo;Procurement Regulations&rdquo;), which can be found at the following website: </strong><strong>www.worldbank.org</strong></p>\n\n<p><strong>General Qualifications and Experience:</strong></p>\n\n<p>To be selected Consulting company shall cover the following requirements:</p>\n\n<p>&nbsp;</p>\n\n<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Supplier must have at least 5 years of experience on the market in the field of providing, designing and implementing business process automation, electronic document management, etc.</p>\n\n<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Experience related to the support, development and implementation of information systems for state bodies of the Republic of Uzbekistan, confirmed by letters of recommendation.</p>\n\n<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Availability of a ready-made demo stand of the master data management system. The supplier must provide access to the system, with instructions for its use.</p>\n\n<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Experience of work in projects financed by international organizations.</p>\n\n<p>&nbsp;</p>\n\n<p>The technical proposal shall meet the following requirements for methodology/work plan and key personnel. The following range of scores should be defined considering three sub-criteria and corresponding percentage weights:</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adequacy and quality of the proposed development methodology with a description of the system design of the entire project and an action plan in accordance with the terms of reference &ndash; 30 points.</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Relevant experience and qualification of key personnel &ndash; 70 points.</p>\n\n<p>The assignment is expected to be completed by Consulting firm composed of a minimum of 5 key experts including IT Architect (1 person), Technical Administrator (1 person), STI Expert (1 person) and Developers (2 persons). Key experts shall possess the following qualifications:</p>\n\n<p><u>IT Architect:</u></p>\n\n<ul>\n\t<li>Advanced degree in Information Technologies;</li>\n\t<li>At least 5 years of experience in the design and implementation of complex projects and/or state programs in Information Technology</li>\n\t<li>Experience in the review and development of documents and reports in the public sector for at least 5 years;</li>\n\t<li>experience with micro services, containers, and means of their orchestration;</li>\n\t<li>understanding of Information systems integration technologies and protocols;</li>\n\t<li>Knowledge of English is required. Knowledge of Uzbek and Russian will be an advantage.</li>\n</ul>\n\n<p><u>STI Expert:</u></p>\n\n<ul>\n\t<li>Master (PhD preferred) degree</li>\n\t<li>At least 10 years of experience as STI sphere</li>\n\t<li>At least 5 years of experience in the design and/or implementation of IT Projects for STI in Central Asia countries.</li>\n\t<li>Familiarity with Uzbekistan&rsquo;s STI development policy;</li>\n\t<li>Excellent hands-on knowledge of existing information technology policies and systems in Uzbekistan;</li>\n\t<li>Excellent analytical and reporting skills</li>\n\t<li>Experience in system integrator preferred.</li>\n\t<li>Knowledge of English is required. Knowledge of Uzbek and Russian will be an advantage.</li>\n</ul>\n\n<p>&nbsp;Technical Administrator:</p>\n\n<ul>\n\t<li>Advanced degree in Information Technologies;</li>\n\t<li>At least 5 years of experience in technical administration of support and implementation of complex projects and/or state programs in Information Technology</li>\n\t<li>Experience in installation and configuration of software, hardware and networks</li>\n</ul>\n\n<p><u>Assistant:</u></p>\n\n<ul>\n\t<li>University BS/BA degree (master&rsquo;s preferred) in information systems, engineering, public administration/public service management or relevant discipline</li>\n</ul>\n\n<ul>\n\t<li>Ability to work with a large amount of information</li>\n\t<li>Excellent communication skills.</li>\n</ul>\n\n<p><u>Developers:</u></p>\n\n<ul>\n\t<li>Bachelor&rsquo;s or Master&rsquo;s degree in Computer Science or a related field</li>\n\t<li>At least 5 years of experience in mobile application and game development&nbsp;</li>\n\t<li>Proficiency in popular coding languages including Python, Java and C++ and frameworks or systems such as AngularJS and Git&nbsp;</li>\n\t<li>Excellent knowledge of the software development life cycle</li>\n\t<li>Strong problem-solving and communication skills</li>\n\t<li>Knowledge of Object-Relational Mapping frameworks</li>\n\t<li>Experience with Agile and Scrum development methodologies</li>\n</ul>\n\n<p>To confirm the compliance of specialists/experts with the above requirements, a potential consulting firm will provide letters of recommendation or reviews or resumes of specialist/experts, copies of diplomas, certificates, and other documents confirming the professional qualifications of specialists/experts and their work experience, as well as copies of other documents, confirming work experience.</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment can be found at the following link:</p>\n\n<p>&nbsp;</p>\n\n<p>https://docs.google.com/document/d/1Yz-ves3c7S3xOy2Nc9ZXFrXW4O_zVttj/edit?usp=sharing&amp;ouid=103319065924197421654&amp;rtpof=true&amp;sd=true</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (revised<br />\nin February 2025) (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>Further information can be obtained at the address below from 10:00 a.m. to 5:00 p.m. during working days.</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest of the Consultant must be delivered in a written form to the address below by <strong>the 28th of October, 2025, 3:00 p.m. Tashkent time.</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Attn: Mr. Dilshodbek Azgarov &ndash; Manager of the Project Implementation Unit</p>\n\n<p>No.7, Universitet Street, Tashkent 100174, Uzbekistan</p>\n\n<p>Tel: +998-97-170-67-84</p>\n\n<p>E-mail: munis.project.uz@gmail.com</p>\n\n<p>&nbsp;</p>\n\n<p><strong><u>As part of the EOI, the Consultant should include the following information:</u></strong></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Consulting Firm Information </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:477.0pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Country of Incorporation:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Acronym:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>EOI Submission Authorized by:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Associations (Joint Venture or Sub-consultancy)</strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:476.6pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.5pt; width:76.0pt\">\n\t\t\t<p>Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:59.95pt\">\n\t\t\t<p>Acronym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:88.65pt\">\n\t\t\t<p>Country of Incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:76.5pt\">\n\t\t\t<p>Joint Venture (JV) or Sub-consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>EOI Submission Authorized By</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:85.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Present the rationale for and benefits of working in association (JV or Sub-consultant) with others rather than undertaking the assignment independently (as appropriate). Describe the proposed management and coordination approach of the association and the role of each firm</em>.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Technical competence </strong></li>\n</ul>\n\n<p><em>Project References - highlight the technical qualifications of your entity/consortium in undertaking similar assignments. Provide details of past experiences working with similar project authorities</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Geographical experience </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Project References, present experiences in similar geographic areas.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Management Competence </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Describe standard policies, procedures, and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.</li>\n\t<li>How your firm/consortium handles complaints concerning the performance of experts or quality of the reports submitted for previous and future assignments? What internal controls are in place to address and resolve complaints.</li>\n\t<li>How you ensure the quality of your firm&rsquo;s/consortium&rsquo;s performance over the life of assignments.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Projects references</strong></li>\n</ul>\n\n<p>Present relevant projects to demonstrate the firm&rsquo;s technical qualifications and geographical experience (maximum 10 projects).</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:468.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">\n\t\t\t<p>Period</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>&hellip;.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:23.0pt\">\n\t\t\t<p>&hellip;&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:202.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:72.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:54.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Summary for the Projects listed above</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:48.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:48.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and input in man-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Eligibility </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>We, the undersigned, certify to the best of our knowledge and belief:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We have read the advertisement, including the terms of reference (TOR), for this assignment (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the TOR for this activity (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We confirm that the project references submitted as part of this EOI accurately reflect the experience of the specified firm/consortium. (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Ensuing assignment resulting from our work product under this assignment, our firm, JV member or sub-consultant, and the expert(s) will be disqualified from short-listing and participation in the assignment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>The lead entity and JV member or sub-consultant are NOT currently sanctioned by or other MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.</li>\n</ul>"},{"id":"OP00366596","notice_type":"Request for Expression of Interest","noticedate":"12-Sep-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-10-09T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"India","project_id":"P178418","project_name":"Tripura Rural Economic Growth and Service Delivery Project","bid_reference_no":"IN-SSA-494641-CS-QCBS-EMIS","bid_description":"Consulting Service for System Integrator for Design, Development, Implementation, and Maintenance of Education Management Information\nSystem (EMIS) and integration of existing systems","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"SAMAGRA SHIKSHA,\nDepartment of School Education,\nGovernment of Tripura.","contact_ctry_name":"India","contact_email":"rajatroy9009@gmail.com","contact_name":"Rajat  Roy","contact_organization":"Samagra Shiksha Abhiyan  (Education)","contact_phone_no":"9774089697","submission_date":"2025-09-12T00:00:00Z","notice_text":"<p><strong>GOVERNMENT OF TRIPURA </strong></p>\n\n<p><strong>DEPARTMENT OF SCHOOL EDUCATION </strong></p>\n\n<p><strong>AGARTALA - 799001</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong><u>Request For Expression of Interest (REoI) For Hiring Firm/ Agency for Design, Development, Implementation, and Maintenance of Education Management Information System (EMIS) and Integration, Enhancement and Maintenance of Existing Modules in The School Information Management System (SIMS) Maintained by The Directorate of Secondary Education (DoSE), Government of Tripura</u></strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:32.5pt; vertical-align:top; width:139.45pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:32.5pt; vertical-align:top; width:322.75pt\">\n\t\t\t<p>INDIA</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:40.15pt; vertical-align:top; width:139.45pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:40.15pt; vertical-align:top; width:322.75pt\">\n\t\t\t<p>Tripura Rural Economic Growth and Service Delivery Project - TRESP</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:95.9pt; vertical-align:top; width:139.45pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Assignment title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:95.9pt; vertical-align:top; width:322.75pt\">\n\t\t\t<p>Hiring Firm/ Agency for Design, Development, Implementation, and Maintenance of Education Management Information System (EMIS) and Integration, Enhancement and Maintenance of Existing Modules in The School Information Management System (SIMS) Maintained by The Directorate of Secondary Education (DoSE), Government of Tripura</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:44.6pt; vertical-align:top; width:139.45pt\">\n\t\t\t<p>Reference No. (as per procurement plan)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.6pt; vertical-align:top; width:322.75pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>IN-SSA-494641-CS-QCBS-EMIS</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Government of Tripura has applied for financing from the World Bank towards the cost of the Tripura Rural Economic Growth and Service Delivery Project (TRESP) and intends to apply part of the proceeds for service.</p>\n\n<p>The Department of School Education, Government of Tripura, proposes to engages a Firm/ Agency for Design, Development, Implementation, and Maintenance of Education Management Information System (EMIS) and integration, enhancement and maintenance of Existing Modules in the School Information Management System (SIMS) maintained by the Directorate of Secondary Education (DoSE), Government of Tripura.</p>\n\n<p>The services include, but are not limited to: -</p>\n\n<ol>\n\t<li>The primary work of the Firm / Agency is to Design, Develop, Implement the Education Management Information System (EMIS).</li>\n\t<li>It will also integrate, enhance, upgrade, and maintain along with the existing modules in The School Information Management System (SIMS) presently being Maintained by The Directorate of Secondary Education (DoSE), Government of Tripura. The proposed EMIS is to strengthen the DoSE&rsquo;s governance system and enable ICT based monitoring and decision making across the governance hierarchy. The principal users across the governance levels include: Teachers, Head Teachers, Education Officers and, Stakeholders of DoSE. Further, the system will also support the information dissemination and communication to School Management Committees / Parent Committees.</li>\n\t<li>The scope for new modules shall cover the following functionalities:\n\t<ol>\n\t\t<li>Development of New Web Portal for DoSE</li>\n\t\t<li>Dashboards, MIS Reports and Analytics</li>\n\t\t<li>Teacher Observation Information</li>\n\t\t<li>School Information</li>\n\t\t<li>Teacher Attendance</li>\n\t\t<li>Students Attendance</li>\n\t\t<li>Comprehensive and Continuous Evaluation (CCE)</li>\n\t\t<li>All CETs (DE CET / LP CET / TET CET)</li>\n\t\t<li>Rationalization and Teacher Promotions</li>\n\t\t<li>No Objection Certificate (NOC) for Passport</li>\n\t\t<li>Data Management</li>\n\t\t<li>System Administration</li>\n\t\t<li>Academic Monitoring System</li>\n\t\t<li>Grievance Management System</li>\n\t\t<li>Social Audit</li>\n\t\t<li>Disciplinary Cases Monitoring</li>\n\t\t<li>Digital Assessment Platform</li>\n\t\t<li>Training Module</li>\n\t\t<li>District Institute of Education and Training (DIET) / College of Teacher Education (CTE) Monitoring System</li>\n\t\t<li>Secondary School Certificate (SSC) Certificate Issue and Corrections</li>\n\t\t<li>Diploma in Elementary Education (D.Ed.) Affiliations &ndash; Renewals</li>\n\t\t<li>Asset Management</li>\n\t\t<li>Private School Management System</li>\n\t\t<li>Complaint Handling System</li>\n\t</ol>\n\t</li>\n\t<li>Scope for Maintenance (existing modules): The scope of work for maintenance of existing modules in EMIS shall cover the following functionalities:\n\t<ol>\n\t\t<li>Web Portals of DoSE, SCERT, Vidya Jyoti Schools and Mid-Day Meal scheme etc.</li>\n\t\t<li>Dashboards and MIS Reports</li>\n\t\t<li>Teacher Transfers</li>\n\t\t<li>Student / Children Information</li>\n\t\t<li>Teacher Information</li>\n\t\t<li>Support and Maintenance</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>These Services are expected to continue over a period of 30 (thirty) months. **</p>\n\n<p><em>**The above services may be modified before the issue of the Request for Proposal (RFP).</em></p>\n\n<p>The Department of School Education, Government of Tripura, now invites eligible Firms/ Agencies to indicate their interest in providing the services. Interested Firms/ Agencies should provide information demonstrating that they have the required qualifications and relevant experience to perform the services.</p>\n\n<p>The Short-listing criteria shall be: -</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:24.8pt; width:30.6pt\">\n\t\t\t<p><strong>#</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:24.8pt; width:273.05pt\">\n\t\t\t<p><strong>Selection Criteria</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:24.8pt; width:165.05pt\">\n\t\t\t<p><strong>Supporting Documents</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:165.6pt; vertical-align:top; width:30.6pt\">\n\t\t\t<p>a.&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:165.6pt; width:273.05pt\">\n\t\t\t<p>The applicant (firm/ Agency) should have a minimum average annual turnover of Rs. 3,00,00,000/- (Rupees three crore) only in any three financial years out of the last five (FY 2023-24, 2022-23, 2021-22, 2020-21, 2019-20).</p>\n\n\t\t\t<p>Values should be duly certified by statutory body like Chartered Accountant or independent Auditors who are competent to do so as recognized by the state concerned.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:165.6pt; width:165.05pt\">\n\t\t\t<p>Audited Financial Statements for (FY 2023-24, 2022-23, 2021-22,</p>\n\n\t\t\t<p>2020-21, 2019-20)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:124.2pt; vertical-align:top; width:30.6pt\">\n\t\t\t<p>b.&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:124.2pt; width:273.05pt\">\n\t\t\t<p>The firm Should have experience of at least one assignment in the last three (03) years for MIS (Management Information System), with a minimum value of Rs.2,00,00,000/- (Rupees two crore) only.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:124.2pt; width:165.05pt\">\n\t\t\t<p>Complete details for each assignment such as work orders etc.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>The attention of interested Firms / Agencies is drawn to the World Bank&#39;s Procurement Regulations November 2020, setting forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to the specific information on conflict of interest related to this assignment under para 3.14-3.17 of the above Regulations.</p>\n\n<p>The firm will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations.</p>\n\n<p>Firms / Agencies are not allowed to associate with other firms in the form of joint ventures or a sub-contract / sub-allocation.</p>\n\n<p>Further information can be obtained from the office of the undersigned mentioned below during office hour ie, 10:00 to 17:00 hours Indian Standard Time (IST) on any working day before the last date of submission of EOIs. Additionally, queries can be sent over email: queries.tresp.edu@gmail.com 24X7 on any day before the last date of submission of EOIs.</p>\n\n<p>Expressions of interest must be submitted online through website https://tripuratenders.gov.in 24X7 by 09/10/2025 at 17:00 hours (IST). The e- procurement website will not allow any Firm / Agency to attempt submission of EOI after the scheduled date and time.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Director</strong></p>\n\n<p><strong>Directorate of Secondary Education </strong></p>\n\n<p><strong>Govt. of Tripura</strong></p>"},{"id":"OP00280236","notice_type":"Request for Expression of Interest","noticedate":"19-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-04-05T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Caribbean","project_id":"P171528","project_name":"Caribbean Digital Transformation Project","bid_reference_no":"LC-OECS COMMISSION-395107-CS-CQS","bid_description":"Consulting Services to Coordinate the Delivery of Advanced Level Digital Skills Certification and Job Coaching in the OECS","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"P.O. Box 179 \nMorne Fortune \nCastries \nSaint Lucia","contact_ctry_name":"St. Lucia","contact_email":"imran.williams@oecs.int","contact_name":"Imran Williams","contact_organization":"Organization of Eastern Caribbean States Commission","contact_phone_no":"1 (758) 5180415","submission_date":"2024-03-19T00:00:00Z","notice_text":"<p><strong><u>REQUEST FOR EXPRESSIONS OF INTEREST</u></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Organisation of Eastern Caribbean States</strong></p>\n\n<p><strong>Caribbean Digital Transformation Project (CARDTP)</strong></p>\n\n<p>Grant No.: IDA &ndash; D6520</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title: </strong>Consulting Services to Coordinate the Delivery of Advanced Level Digital Skills Certification and Job Coaching in the OECS</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>.: <em>LC-OECS COMMISSION-395107-CS-CQS</em></p>\n\n<p>&nbsp;</p>\n\n<p>The Organisation of Eastern Caribbean States (OECS) Commission has received funding from the World Bank toward the cost of the Caribbean Digital Transformation Project (CARDTP) and intends to apply part of the proceeds for Consulting Services to Coordinate the Delivery of Advanced Level Digital Skills Certification and Job Coaching in the OECS.</p>\n\n<p>&nbsp;</p>\n\n<p>The objective of the consulting services (&ldquo;the Services&rdquo;) is to support the implementation of the CARDTP by coordinating advanced-level digital skills training, certification and job coaching to at least three hundred (300) beneficiaries from the project countries in the following areas:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Enhancing national and regional capacities for remote working opportunities with global firms and clients.</li>\n\t\t<li>Strengthening capacity for digital transformation.</li>\n\t\t<li>Complementing digital skill training activities undertaken at the national level of CARDTP member countries.</li>\n\t\t<li>Increasing the number of individuals utilizing advanced digital skills to secure employment opportunities.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The assignment is expected to be undertaken over a period of twelve (12) months.</p>\n\n<p>&nbsp;</p>\n\n<p>The OECS now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The minimum required qualifications and experience are listed in section 9 of Terms of Reference (TOR).&nbsp; The details of the services required are available in the TOR which is available on the official website: www.oecs.org or can be obtained at the address given below.</p>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (&lsquo;Procurement Regulations&rsquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>To obtain the maximum degree of comparison among Expressions of Interests (EOIs) and facilitate the evaluation process, the EOI should be a maximum of 30 pages and include the following information included below:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Title page with name of firm submitting the EOI</strong>: should contain name of firm (or joint venture and/or a sub-consultancy, if applicable), address, email, telephone, name of contact person and date of submission.</li>\n\t<li><strong>Expression of Interest</strong>: including the firm&rsquo;s general and specific experience, similar assignments, curriculum vitae of the pool of experts, etc.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>&nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Consultants&rsquo; Qualification selection method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours 08:30 a.m. &ndash; 4:00 p.m. (0830 to 1600 hours).</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Ms. Jenna Flavien </strong></p>\n\n<p><strong>Procurement Officer</strong></p>\n\n<p><strong>Caribbean Digital Transformation Project</strong></p>\n\n<p><strong>OECS Commission </strong></p>\n\n<p><strong>Morne Fortun&eacute;</strong></p>\n\n<p><strong>P.O. Box 1383</strong></p>\n\n<p><strong>Castries</strong></p>\n\n<p><strong>Saint Lucia</strong></p>\n\n<p><strong>Telephone: 758-455-6424/285-1980</strong></p>\n\n<p><strong>Email: </strong><strong><em>procurementbids@oecs.int</em></strong><strong><u>&nbsp; </u></strong><strong>&nbsp;</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Copied to: </strong></p>\n\n<p>Mr. Imran Williams, <em>imran.williams@oecs.int </em>&nbsp;<u>&nbsp;</u>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>An electronic copy of Expressions of Interest are to reach the OECS Commission by <strong>April 5, 2024</strong> addressed to:</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Ms. Jenna Flavien, Procurement Officer</strong></p>\n\n<p><strong>At the following email address:</strong></p>\n\n<p><strong><em>procurementbids@oecs.int</em></strong><strong> </strong></p>\n\n<p><em>copied to imran.williams@oecs.int</em></p>\n\n<p>&nbsp;</p>\n\n<p>The email submissions should include the name and address of the Consultant and shall be clearly marked in the subject line as &ldquo;<strong>Expression of Interest &ndash; &ldquo;Consulting Services to Coordinate the Delivery of Advanced Level Digital Skills Certification and Job Coaching in the OECS&rdquo;.</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Caribbean Digital Transformation Project</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>IDA &ndash; D6520</strong></p>\n\n<p><strong>Scope of Services</strong></p>\n\n<p><strong>Terms of Reference</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Consulting Services to Coordinate the Delivery of Advanced Level Digital Skills Certification and Job Coaching in the OECS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>March 2024</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Introduction and Background</strong>&nbsp;</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The Organisation of Eastern Caribbean States (OECS) Commission and the Governments of Grenada, Dominica, Saint Lucia, and St. Vincent and the Grenadines are implementing a World-Bank-financed Caribbean Digital Transformation Project (&ldquo;CARDTP&rdquo;), which aims to increase access to and use of digital services, technologies and skills by governments, businesses, and individuals in the Eastern Caribbean countries.</p>\n\n<p>&nbsp;</p>\n\n<p>Component 1 of CARDTP - Digital Enabling Environment seeks to develop an enabling environment for the region&rsquo;s digital economy increasing competition, investment, and innovation while promoting trust and security of online transactions. A sub-component contemplates, among others, the bolstering of the legal and regulatory environment, institutions, and capacity to build trust in online transactions and strengthen the security and resilience of digital infrastructure and systems, centered on data protection and privacy.</p>\n\n<p>&nbsp;</p>\n\n<p>Component 3 of CARDTP- Digital Skills and Technology Adoption, aims to better equip individuals and businesses across the region for the jobs and economy of the future. The project will adopt a regional approach, aiming to capture economies of scale in specialized digital skills development programs and to create a pool of advanced digital talent to better position the region to attract investment by digital firms.</p>\n\n<p>&nbsp;</p>\n\n<p>This is to address the identified challenge that high educational outcomes in the region have not translated into the development of the skills needed in the digital era. Building digital skills and creating a stronger local and regional market for them will be critical to tackling the region&rsquo;s unemployment challenges and maintaining competitiveness in the global economy of the future. Traditional education institutions are not producing enough graduates with the workforce-ready technical and &ldquo;soft&rdquo; skill sets in growing demand from digitally enabled industries. Women and girls are less likely to participate in STEM courses as a result of prevailing social norms, making them less prepared for the most promising digitally enabled fields of employment. Much of the top talent developed leaves the islands to pursue opportunities in the larger regional markets or globally, while those that stay do not fully utilize their skill sets. The high costs of investment in specialized digital skills are also a challenge, suggesting that a regional approach is needed to share costs and expertise to create a pool of digital talent to attract investment and support technology adoption by traditional industries.</p>\n\n<p>&nbsp;</p>\n\n<p>The high educational outcomes of the OECS have not translated into a local talent pool that provides these countries with the capacity to leverage digital technologies for sustained economic growth, reduction of social challenges, and improved benefits for citizens. In this regard the Market Assessment for the demand and supply of digital skills in the OECS revealed that there is a greater need to facilitate advanced level certification to meet the skills gaps in the marketplace. Against this backdrop, CARDTP is assisting Dominica, Grenada, Saint Lucia, and St. Vincent and the Grenadines to enhance their capacity to engage more effectively in the global digital economy.</p>\n\n<p>&nbsp;</p>\n\n<p>CARDTP seeks to use digital transformation to strengthen the economic viability of the participating countries in the global economy and position them to eliminate persistent gaps in social vulnerability, support the move towards quality employment outcomes as well as tackle weak institutional capacity. The project also seeks to ensure that the citizens of the participating countries can access and obtain the relevant digital skills and literacy to adopt new technologies and participate fully in the digital economy. This includes basic digital skills and competencies, which empower individuals to interact online, consume digital goods and services, and advanced and specialized digital skills; enabling the workforce to effectively utilize technologies for enhanced productivity, innovations and entrepreneurships, digital transformation of public and private sector, and economic growth.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Goal </strong></li>\n</ol>\n\n<p>The overall goal of this consultancy is to create a pool of advanced and specialized digital talent to better position the region to attract investments by digital firms and to enable OECS citizens to access remote working opportunities globally.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Objectives of the Consulting Services</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The consultancy will support the implementation of the CARDTP by coordinating advanced-level digital skills training, certification and job coaching to at least three hundred (300) beneficiaries from the project countries in the following areas:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Enhancing national and regional capacities for remote working opportunities with global firms and clients.</li>\n\t\t<li>Strengthening capacity for digital transformation.</li>\n\t\t<li>Complementing digital skill training activities undertaken at the national level of CARDTP member countries.</li>\n\t\t<li>Increasing the number of individuals utilizing advanced digital skills to secure employment opportunities.</li>\n\t</ol>\n\t</li>\n\t<li><strong>Scope of Work</strong>\n\t<ol>\n\t\t<li><strong>Project Implementation and Coordination</strong>\n\t\t<ol>\n\t\t\t<li>Collaborate with leaderships of national PIUs (national and regional) to provide input on the selection and placement of scholarship awardees.</li>\n\t\t\t<li>Participate in periodic meetings of the CARDTP implementation team/ PIU leads as requested.</li>\n\t\t\t<li>Share information on learner progress and employment outcomes as requested.</li>\n\t\t\t<li>Utilize the market assessment report and digital frameworks prepared under the CARDTP project to select training topics, improve selection criteria and design the program of support for people with barriers to access and facilitate support for learners at work.</li>\n\t\t</ol>\n\t\t</li>\n\t\t<li><strong>Coordination of Training, Assessment</strong><strong>,</strong><strong> and Certification</strong>\n\t\t<ol>\n\t\t\t<li>Identify learners and their training needs, develop generic workplace skills, and support learners through their transitions into work via different modes of delivery,[1][2] including the needs of females and students or other disadvantaged groups.&nbsp;</li>\n\t\t\t<li>Develop Soft Skills, job-seeking, self-employment, and career development skills, and will facilitate workplace learning and internships wherever possible.&nbsp;</li>\n\t\t\t<li>Undertake co creation of the programme with key experts at the national and regional levels, taking into consideration the recommendations from the assessment referred to above, as one of the guiding documents. The occupations in-demand and the priority skills taken from a recent market scan are detailed in section 12, and a reference list of industry-standard certifications is outlined in annexes 1 and 2 of this Terms of Reference. The consultancy should also provide recommendations on other relevant advanced-level certifications that would be required for online digital jobs.&nbsp; The CARTP Implementation Unit will engage in on-screen training provision for the technical element of the programme, and so the consultant will recommend the technical courses.&nbsp; The consultant will also work with the implementation unit to develop the process by which learners are enrolled on technical courses, and the process by which information on progress is shared. &nbsp;</li>\n\t\t\t<li>Use training approaches that use workplace learning, job-embedded professional development, and internships wherever possible.</li>\n\t\t\t<li>Conduct a careers conversation with prospective participants which orientates them in the job market and allows them to understand how they will use the proposed training and certification program to find work and advance their careers.</li>\n\t\t\t<li>Conduct a pre-program assessment of participants to confirm their eligibility for the program, understand their current skills and experience, and identify their aspirations and learning needs before confirming the suitability of their chosen program and work with the CARDTP Implementation Unit to enroll them in it. Applicants should be selected based on the following broad criteria.\n\t\t\t<ol>\n\t\t\t\t<li>He/she must be between the ages of 18 - 35 years.</li>\n\t\t\t\t<li>Persons who have not pursued formal academic studies after secondary school must have a minimum of 5 CSEC passes at General Proficiency with Grades I-III.</li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t\t<li>Monitor the progress of learners and submit periodic reports. Conduct post-program assessment of participants against the learning objectives of the program and employment outcomes (where the student finds work or career advancement related to the program content)</li>\n\t\t\t<li>Facilitate examinations for internationally recognized professional certificates of completion to successful participants for the advanced digital skills element of their program as necessary.</li>\n\t\t\t<li>Submit monthly and end-of-program reports that include individual pre and post -competency assessments, attendance, employment outcomes, feedback on the program, analyses and responses to issues, and recommendations.</li>\n\t\t\t<li>Respond promptly to requests for information.</li>\n\t\t\t<li>Submit an end-of-training report that includes individual pre and post -and post-competency assessments, final program and course outlines, information on work-based training, employment outcomes, mentorship program and learner&rsquo;s evaluation of the training programs, analyses of issues, achievements of learners as indicated by certification and levels and recommendations and success rates with remote work opportunities. The report outline will be agreed in conjunction with the Project team.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Mentorship</strong> <strong>and Job Coaching</strong>\n\n\t\t<ol>\n\t\t\t<li>Design, develop, coordinate, and implement a mentorship and job coaching program for learners designed to help them maximise the value of their learning for job, self-employment, and career advancement.</li>\n\t\t\t<li>Provide mentorship to learners throughout their learning, job searches, job-applications, and career development.</li>\n\t\t\t<li>Provide support to learners and assist with the resolution of training-related issues.</li>\n\t\t\t<li>Provide support to learners in the identification and engagement with platforms on remote work opportunities.</li>\n\t\t\t<li>Support learners through the process of securing appropriate work on platforms or by other means.</li>\n\t\t\t<li>Facilitate job matching and coaching resulting in the placement of at least 80% of learners to remote jobs and internships.</li>\n\t\t\t<li>Submit monthly mentorship and job coaching reports outlining the time spent on delivering mentorship and coaching to prepare trainees to access remote jobs as well as documenting any success stories.</li>\n\t\t\t<li>Evaluation of the performance of job coaching and mentorship experience by gathering feedback from mentees and host organization on the job coaching and placement experience.</li>\n\t\t\t<li>Provide follow-up career-related support as requested by the interns. This may be in the form of mentoring or coaching or other consultative or advisory service.</li>\n\t\t\t<li>Organise learning workshops to disseminate information on observations, lessons learned and recommendations on the adoption of business coaching as a tool for digital skills development in the private sector.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n\t<li><strong>Deliverables, timetable, and payment schedule</strong></li>\n</ol>\n\n<p><strong>The consultant will be expected to deliver the following: </strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>An inception report must be submitted within one (1) month of the signing of the contract. This must include details on methodology, course schedule, draft program, and proposals for addressing gender issues. The inception report will confirm the skills that will be developed in the programs, including the technical and advanced skills outlined in Section 12 below and job-seeking, self-employment, and career development skills, using workplace learning and internships wherever possible. The inception report should cite labor market intelligence in support of specific certificates selected. &nbsp;The inception report will also propose the process by which learners are enrolled onto certificated courses, which will be managed directly by the CARDTP Implementation Unit, and for sharing information on enrolments, student progress, completion, and certification.</li>\n\t\t<li>Coordinate the delivery of advanced-level skills training and facilitate the examination and certification of at least 300 individuals proposed by OECSC, 40% of learners enrolled in programs should be women. The consultant is expected to manage their program such that over 100% of enrolled learners complete their program and achieve their certification, and that the rate for women is no worse than the aggregate figure.</li>\n\t\t<li>Support students through the processes of finding work and understanding how to develop their careers, achieving employment outcomes for at least 80% of enrolled learners.&nbsp; The rate for women should be no worse than the aggregate figure.</li>\n\t\t<li>Submit Concise Monthly Progress Reports containing data analytics on student participation, performance, completion, certification, and employment outcomes, Monthly updates on progress will be provided at meetings of the PIUs.</li>\n\t\t<li>The consultant will submit a final report that details course outlines, names, areas of specialization and level of certification of each graduate, work-based training, employment outcomes, student&rsquo;s evaluation of course, and recommendations. The latter should include suggestions for additional training for improved work readiness. The final report must be submitted within 8 weeks following completion of the training program.</li>\n\t</ol>\n\t</li>\n\t<li><strong>Expected Outputs </strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Target: 300&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; individuals acquiring internationally recognized advanced professional certification 40% of which women</li>\n\t<li>Target: 240&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; individuals utilizing advanced digital skills to improve workplace productivity or secure new employment opportunities 40% of which women</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Timetable, and payment schedule</strong></li>\n</ol>\n\n<p>Payments will be made on acceptance of deliverables by the PIU according to the schedule in the table below.&nbsp; Acceptance of deliverables by the PIU will be based on quality criteria derived from these Terms of Reference.</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:648px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:178.65pt\">\n\t\t\t<p><strong>Deliverable/Milestone</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:225.35pt\">\n\t\t\t<p><strong>Timeline from contract signature</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:81.65pt\">\n\t\t\t<p><strong>Payment (%)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:178.65pt\">\n\t\t\t<p>Inception Report (including training, certification mentorship and job coaching plans) delivered to the OECS Commission</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.35pt\">\n\t\t\t<p>Q4 2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:23.85pt; vertical-align:top; width:178.65pt\">\n\t\t\t<p>1st monthly training report on cohort 1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:23.85pt; vertical-align:top; width:225.35pt\">\n\t\t\t<p>Q1 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:23.85pt; vertical-align:top; width:81.65pt\">\n\t\t\t<p>25%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:178.65pt\">\n\t\t\t<p>Completion Report on cohort 1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.35pt\">\n\t\t\t<p>Q2 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.65pt\">\n\t\t\t<p>25%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:178.65pt\">\n\t\t\t<p>1st monthly training report on cohort 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.35pt\">\n\t\t\t<p>Q3 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.65pt\">\n\t\t\t<p>25%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:1.25pt; vertical-align:top; width:178.65pt\">\n\t\t\t<p>Completion Report on cohort 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.25pt; vertical-align:top; width:225.35pt\">\n\t\t\t<p>Q4 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.25pt; vertical-align:top; width:81.65pt\">\n\t\t\t<p>25%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li><strong>Reporting requirements</strong></li>\n</ol>\n\n<p>An inception must be submitted to the regional PIU within one (1) month of the signature of the contract. This must include details on methodology, course schedule, draft program, and proposals for addressing gender issues. The consultant will provide monthly reports to the regional PIU. The final report must be submitted within 4 weeks following completion of the training program.</p>\n\n<ol>\n\t<li><strong>Qualification and Experience: &nbsp;</strong>\n\n\t<ol>\n\t\t<li><strong>Qualification and Experience of the Firm: </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The firm should meet the following demonstrated qualification criteria including demonstrated expertise and experience:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>Must be a firm or a consortium of firms with at least seven (7) years of extensive experience in the coordination of workplace delivery of training and certification in advanced digital skills, in soft skills development, and in supporting learners through job-seeking, self-employment and career development.</li>\n\t\t\t<li>Must have experience in undertaking at least two (2) training and job coaching programs in advanced digital skills within the last five (5) years.</li>\n\t\t\t<li>Must have an adequate complement of staff and requisite physical resources to coordinate training and mentorship for at least three hundred (300) individuals in a hybrid manner during the life of the project.</li>\n\t\t\t<li>Must have experience in identifying training courses and in the selection of learners of a comparable nature in terms of scope, levels, complexity, and areas of specialization.</li>\n\t\t\t<li>Must demonstrate evidence of partnership with relevant employers and capacity to secure internships or other relevant work-based experience.</li>\n\t\t\t<li>Demonstrated capacity for mentorship.</li>\n\t\t\t<li>Proven experience delivering training and job coaching in small island developing states as well as familiarity with the unique dynamics of the Eastern Caribbean region in its project references or team composition is a plus. The response should include descriptions of similar assignments conducted, experience in similar conditions, and availability of appropriate staff.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Key Experts</strong></li>\n</ol>\n\n<p>The Consulting Firm shall have core team members who possess a range of skills and qualifications, including the key experts identified below with the corresponding qualifications, in order to successfully undertake the assignment. As such, the Consulting Firm shall have key experts with the following:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Key Expert 1 - Team Leader/ Project Coordinator </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p><strong>Qualification:</strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>Postgraduate degree in ICT, Education, Engineering, Business, Social Science, or related field.</li>\n\t\t\t<li>Project Management qualifications will be an advantage.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Skills and Experience </strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>At least five (5) years&rsquo; experience coordinating the hybrid (virtual and in-person) delivery of digital skills training programs.</li>\n\t\t\t<li>Proven experience managing skills training projects.</li>\n\t\t\t<li>Experience in designing and implementing selection criteria for digital learners.</li>\n\t\t\t<li>Experience in managing e-learning platforms and content.</li>\n\t\t\t<li>Experience working with public agencies, regional institutions, or development organizations.</li>\n\t\t\t<li>Excellent verbal communication and report preparation skills.</li>\n\t\t\t<li>Must have strong report writing, data analysis and data visualization skills.</li>\n\t\t\t<li>Proven experience with education and training, human resource development, or related tasks.</li>\n\t\t\t<li>Experience conducting assessments of learners and learning outcomes.</li>\n\t\t\t<li>Experience training youth in the Caribbean will be an added advantage.</li>\n\t\t\t<li>Familiarity with the TVET Certification Framework and Competency-Based Assessment and Certification process.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Key Expert 2 - Mentorship and Coaching Coordinator </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p><strong>Qualifications </strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>Postgraduate Degree in ICT, Education, Psychology, Engineering, Business, Social Science, or related field</li>\n\t\t\t<li>Coaching certification will be an asset</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Skills and Experience </strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>Proven experience with education and training, human resource development or related tasks.</li>\n\t\t\t<li>Current experience in the labour markets which students will be entering.</li>\n\t\t\t<li>Experience delivering mentorship and coaching students.</li>\n\t\t\t<li>Experience providing career guidance to students.</li>\n\t\t\t<li>Experience facilitating job placement for graduates.&nbsp;</li>\n\t\t\t<li>Strong understanding of career development pathways for digital skills.</li>\n\t\t\t<li>Experience mapping career pathways for advanced digital skills.</li>\n\t\t\t<li>Track record of designing and implementing programs to motivate youth.</li>\n\t\t\t<li>Experience working with public agencies, regional institutions or development organizations.</li>\n\t\t\t<li>Strong team building skills.</li>\n\t\t\t<li>Excellent verbal communication and report preparation skills.</li>\n\t\t\t<li>Strong report writing, data analysis and visualization skills.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n\t<li><strong>7. Duration</strong></li>\n</ol>\n\n<p>The proposed activity will have a duration of twelve (12) months.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Priority Areas of this Consultancy:</strong></li>\n</ol>\n\n<p><strong>To train and certify professionals at the advanced level for remote work in the following suggested occupations:</strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:624px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:467.3pt\">\n\t\t\t<p><strong>Occupations </strong></p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:468.0pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong>Graphic Designer</strong></li>\n\t\t\t\t<li><strong>Web Developer</strong></li>\n\t\t\t\t<li><strong>Mobile App Developer</strong></li>\n\t\t\t</ul>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong>Digital Marketing Specialist </strong></li>\n\t\t\t\t<li><strong>Systems Analyst</strong></li>\n\t\t\t\t<li><strong>Compliance Officer</strong></li>\n\t\t\t</ul>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong>Cyber Security Specialist</strong></li>\n\t\t\t</ul>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong>Content Writer</strong></li>\n\t\t\t\t<li><strong>Networking Analyst</strong></li>\n\t\t\t\t<li><strong>Product Manager</strong></li>\n\t\t\t</ul>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong>UX/UI Designer</strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Suggested Technical and Soft Skills </strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:640px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#4472c4; border-color:black; width:248.8pt\">\n\t\t\t<p><strong>Key Technical Digital Skills in Demand in the ITeS Sector in the OECS</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#4472c4; border-color:black; width:231.0pt\">\n\t\t\t<p><strong>Key Soft Skills in Demand in the ITeS Sector in the OECS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:248.8pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Content writing skills</li>\n\t\t\t\t<li>Social media management skills</li>\n\t\t\t\t<li>Blog writing</li>\n\t\t\t\t<li>Content creation</li>\n\t\t\t\t<li>Search engine optimisation</li>\n\t\t\t\t<li>Search engine marketing</li>\n\t\t\t\t<li>Digital marketing skills</li>\n\t\t\t\t<li>Paid advertising (google, meta)</li>\n\t\t\t\t<li>Use of customer relationship management platforms</li>\n\t\t\t\t<li>Web development skills</li>\n\t\t\t\t<li>Application development skills</li>\n\t\t\t\t<li>Cyber security skills</li>\n\t\t\t\t<li>Database management skills</li>\n\t\t\t\t<li>Data security skills</li>\n\t\t\t\t<li>Data analysis and data-driven decision-making skills.</li>\n\t\t\t\t<li>Coding and programming</li>\n\t\t\t\t<li>Blockchain skills</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:231.0pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Communication</li>\n\t\t\t\t<li>Collaboration</li>\n\t\t\t\t<li>Willingness to learn.</li>\n\t\t\t\t<li>Creativity/Creative thinking</li>\n\t\t\t\t<li>Analytical skills</li>\n\t\t\t\t<li>Critical thinking/problem solving.</li>\n\t\t\t\t<li>Flexibility/Adaptability</li>\n\t\t\t\t<li>Ability to apply ICT skills to business or other fields.</li>\n\t\t\t\t<li>Initiative</li>\n\t\t\t\t<li>Customer Service</li>\n\t\t\t\t<li>Teamwork/Collaboration</li>\n\t\t\t\t<li>Relationship management</li>\n\t\t\t\t<li>Emotional intelligence</li>\n\t\t\t\t<li>Leadership</li>\n\t\t\t\t<li>Planning and organising</li>\n\t\t\t\t<li>Project Management</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Annex 1: Career Development Pathway for Digital Skills</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:868px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e2f3; border-color:black; height:29.15pt; width:346.55pt\">\n\t\t\t<p><strong>PRIORITY SKILLS</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; border-color:black; height:29.15pt; width:304.75pt\">\n\t\t\t<p><strong>ROLE/OCCUPATION </strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e8f3d3; border-color:black; height:5.45pt; width:346.55pt\">\n\t\t\t<p>Animation Skills</p>\n\n\t\t\t<p>Digital Media Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e8f3d3; height:5.45pt; width:304.75pt\">\n\t\t\t<p>Animation and Graphic Designer, Game Designer, Music Producer, Visual Development Artist</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d2cab6; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Digital Marketing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d2cab6; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Digital Marketing Specialist</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d2cab6; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Digital Marketing Skills</p>\n\n\t\t\t<p>Web Design Skills</p>\n\n\t\t\t<p>Photography Skills</p>\n\n\t\t\t<p>Videography Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d2cab6; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Graphic Designer, Web Designer, Package Designer, Illustrator, Editorial Designer, Fabric Designer, Photographer, Art Director, Advertising Director, Designer for Outdoor and Transit Advertising, Creative Director, Corporate Identity Designer</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#7f7f7f; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Digital Media Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#7f7f7f; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Graphic Designer, Web Developer</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#7f7f7f; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Digital Media Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#7f7f7f; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Graphic Designer, Web Developer</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c1edfc; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>E-Learning Instructional Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c1edfc; height:16.35pt; width:304.75pt\">\n\t\t\t<p>e-Learning Instructor&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#daf0f3; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Entrepreneurial Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#daf0f3; height:16.35pt; width:304.75pt\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#daf0f3; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Graphics and Animation Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#daf0f3; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Graphic Designer</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#daf0f3; border-color:black; height:10.9pt; width:346.55pt\">\n\t\t\t<p>Graphics and Animation Skills</p>\n\n\t\t\t<p>UX/UI Design Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#daf0f3; height:10.9pt; width:304.75pt\">\n\t\t\t<p>Graphic Designers</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#daefd3; border-color:black; height:20.05pt; width:346.55pt\">\n\t\t\t<p>Project Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#daefd3; height:20.05pt; width:304.75pt\">\n\t\t\t<p>Project Manager</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d2cab6; border-color:black; height:16.35pt; width:346.55pt\">\n\t\t\t<p>Web Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d2cab6; height:16.35pt; width:304.75pt\">\n\t\t\t<p>Web Developer</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Annex 2: Examples of Career Development Pathways for Digital Skills: Professional Certifications</p>\n\n<p>&nbsp;</p>\n\n<table align=\"center\" border=\"1\" cellspacing=\"0\" style=\"width:859px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#fbd5b5; border-color:black; width:141.0pt\">\n\t\t\t<p><strong>PRIORITY SKILLS</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#fbd5b5; border-color:black; width:248.1pt\">\n\t\t\t<p><strong>PROFESSIONAL CERTIFICATION</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#fbd5b5; border-color:black; width:5.0cm\">\n\t\t\t<p><strong>ROLE/OCCUPATION</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"background-color:#fbd5b5; border-color:black; width:4.0cm\">\n\t\t\t<p><strong>CERTIFICATION </strong></p>\n\n\t\t\t<p><strong>LEVELS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#fbd5b5; width:42.5pt\">\n\t\t\t<p><strong>E/A/F</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#fbd5b5; width:35.45pt\">\n\t\t\t<p><strong>I</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#fbd5b5; width:35.45pt\">\n\t\t\t<p><strong>E/P/S</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>AWS Certified Solutions Architect - Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Solutions/Cloud Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>AWS Certified Developer - Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>Cisco Certified DevNet Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Network Engineer, Software Developer, Programmer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>AWS Certified Associate Application Developer - Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Application Developer - Operational Decision Manager Standard</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Application Developer - Business Automation Workflow</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Deployment Professional - Tivoli Monitoring</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer, Solution Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Developer - Datacap</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Implementer - API Connect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>AWS Certified SAP on AWS - Speciality</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>System Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Developer - Business Automation Workflow using Workflow Center</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Developer - Cloud Pak for Applications PLUS Red Hat Certified Specialist in OpenShift Application Development</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Application Development Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c6d9f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Developer - InfoSphere DataStage</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:5.0cm\">\n\t\t\t<p>Solution Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c6d9f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>CompTIA Cloud Essentials+</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Business Development staff, Technical Sales Specialist, Business Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Associate Site Reliability Engineer - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Advocate - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Web/Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Technical Advocate - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Architect - Cloud Pak System</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>CompTIA Cloud+</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>AWS Certified Cloud Practitioner</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Solutions/Cloud Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>AWS Certified Solutions Architect - Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Solutions/Cloud Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - WebSphere Hybrid Edition</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Web Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Watson IOT Continuous Engineering</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Database Administrator, Software Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\n\t\t\t<p>Database Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Cloud Pak for Business Automation</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud computing Skills</p>\n\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Administrator - Cloud Pak for Data</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud for Financial Services Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud for SAP Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud Pak for Security Administrator Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Security Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>MySQL Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Database Development Skills</p>\n\n\t\t\t<p>Web Applications Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>Oracle APEX Cloud Developer Certified Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud computing Skills</p>\n\n\t\t\t<p>Database Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud Pak for Data System Administrator Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Data System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Database Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Watson IoT Asset Performance Management</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Database Administrator, Data Scientist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Digital Marketing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Professional Sales Engineer - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Sales Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Machine Learning Skills</p>\n\n\t\t\t<p>Data Analytics</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Cloud Pak for Data</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Data Administration, Cloud Administrator, Machine Learning Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud Satellite v1 Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\n\t\t\t<p>Virtualization Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Azure Solutions Architect Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Solutions Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Security Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud Security Engineer Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>System Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud DevSecOps Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>System Administrator Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - WebSphere Hybrid Edition PLUS Red Hat Certified Specialist in OpenShift Administration</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Virtualization Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Professional Architect - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>VMware System Skills</p>\n\n\t\t\t<p>Database Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Cloud for VMware Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills</p>\n\n\t\t\t<p>Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Professional Developer - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Application Developer, Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills, Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Cloud Pak for Integration</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator, Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills, Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Cloud Pak for Multicloud Management PLUS Red Hat Certified Specialist in OpenShift Administration</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator, Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbe5f1; border-color:black; width:141.0pt\">\n\t\t\t<p>Cloud Computing Skills, Data Security Skills, Database Management Skills</p>\n\n\t\t\t<p>Web Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:248.1pt\">\n\t\t\t<p>IBM Certified Professional SRE - Cloud</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:5.0cm\">\n\t\t\t<p>Cloud Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbe5f1; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Computer Hardware Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Associate - IBM Control Desk</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>System Technician</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ebf1dd; border-color:black; width:141.0pt\">\n\t\t\t<p>Customer Relationship Management Platforms Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ebf1dd; width:248.1pt\">\n\t\t\t<p>Cisco Customer Success Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ebf1dd; width:5.0cm\">\n\t\t\t<p>Customer Success Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ebf1dd; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ebf1dd; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ebf1dd; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>Cisco Certified CyberOps Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Cybersecurity Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>CCNP Security</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Associate Security Engineer</p>\n\n\t\t\t<p>Network Security Engineer</p>\n\n\t\t\t<p>Information Security Analyst</p>\n\n\t\t\t<p>Information Security Engineer</p>\n\n\t\t\t<p>Senior Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>&nbsp; Cisco Certified CyberOps Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Cybersecurity Engineer</p>\n\n\t\t\t<p>Cybersecurity Investigator</p>\n\n\t\t\t<p>Incident Manager</p>\n\n\t\t\t<p>Incident Responder</p>\n\n\t\t\t<p>SOC Analyst</p>\n\n\t\t\t<p>Senior Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>CompTIA Security+</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Security Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>CompTIA Cybersecurity Analyst (CySA+)</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Threat Intelligence Analysts, Application Security Analysts, Compliance Analysts, Incident Responders/ Handlers, and Threat Hunters</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>CCIE Security</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Security Architect, Chief Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Cybersecurity Architect Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Cybersecurity Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>CompTIA PenTest+</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Penetration Tester,</p>\n\n\t\t\t<p>Security Consultant,</p>\n\n\t\t\t<p>Cloud Penetration Tester,</p>\n\n\t\t\t<p>Web App Penetration Tester,</p>\n\n\t\t\t<p>Cloud Security Specialist,</p>\n\n\t\t\t<p>Network &amp; Security Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e5dfec; border-color:black; width:141.0pt\">\n\t\t\t<p>Cybersecurity Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:248.1pt\">\n\t\t\t<p>IBM Certified SOC Analyst - QRadar SIEM Plus CompTIA Cybersecurity Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:5.0cm\">\n\t\t\t<p>Security Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e5dfec; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>Google Data Analytics Professional Certificate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Azure Enterprise Data Analyst Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Analyst, Solution Architects, Data Engineers, Data Scientists, AI Engineers, Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\n\t\t\t<p>Visualization Skills</p>\n\n\t\t\t<p>Data Mining Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>CompTIA Data+</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Reporting Analyst, Operations Analyst, Marketing Analyst, Data Architect, Data Analyst, Business Intelligence Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>AWS Certified Data Analytics - Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>Code Academy:<strong> </strong>Business Intelligence Data Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Infrastructure Data science Certified Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Scientist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Analytics Skills</p>\n\n\t\t\t<p>Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>IBM Certified Developer - Cognos Analytics</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Application Development Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#dbeef3; border-color:black; width:141.0pt\">\n\t\t\t<p>Data Science Skills</p>\n\n\t\t\t<p>Data Management Skills</p>\n\n\t\t\t<p>Data Visualization Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:248.1pt\">\n\t\t\t<p>IBM Certified Specialist - AI Enterprise Workflow</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:5.0cm\">\n\t\t\t<p>Data Scientist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#dbeef3; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Certified Foundations Associate, Database</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Specialist - SPSS Statistics</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Data Management Foundations Certified Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator, Cloud Administration</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Associate Certified DBA - Fundamentals</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Azure Database Administrator Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Infrastructure Certified Architect Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Network Engineer, Database Administrator, Cloud Administration</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Security Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Identity and Access Administrator Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator, Identity and Access Administrator, Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Microsoft 365 Certified: Messaging Administrator Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Security Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Microsoft Certified: Information Protection Administrator Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>information Protection Administrator, Risk Practitioner, Security Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Managements Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Associate Certified DBA - Fundamentals</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Managements Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Advanced Deployment Professional - Maximo Asset Management</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Product Manager, System Analyst, Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Application Development Skills</p>\n\n\t\t\t<p>Programming Skills, Data Security Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Deployment Professional - Security Identity Governance and Intelligence</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator, Security Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>System Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Specialist - InfoSphere Optim for Distributed System Fundamentals</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Application Developer, Database Administrator,</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\n\t\t\t<p>Cloud computing</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Deployment Professional - FileNet</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills Application Development</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Deployment Professional - Maximo Manage</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills Application Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Deployment Professional - Maximo Asset Management Functional Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>System Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle MySQL Database Developer Certified Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Certified Professional Oracle Linux System Administrator Certification</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Certified Professional, Data Guard Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Certified Professional, MySQL Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Data Integrator Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Database Administrator Certified Master</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Database Administrator Certified Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Software Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Database Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Exadata Database Machine X9M Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle GoldenGate Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle SOA Suite Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Solaris Installation and Configuration Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle WebLogic Server Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle ZFS Storage Appliance Certified Implementation Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified System Administrator - Informix</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>System Administrator, Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\n\t\t\t<p>Software Development Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Infrastructure Certified Architect Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Software Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Administration Skills</p>\n\n\t\t\t<p>Networking Skills</p>\n\n\t\t\t<p>Software Development Skills</p>\n\n\t\t\t<p>Cloud Computing Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Infrastructure Certified Cloud Operations Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Operations Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Data Modelling Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Solution Architect - Data Warehouse</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills,</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Maximo Visual Inspection Developer Specialty</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>System Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Data Visualization Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>Oracle Cloud Infrastructure Observability and Management Certified Professional</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Management Skills</p>\n\n\t\t\t<p>Web Development Skills</p>\n\n\t\t\t<p>Enterprise Resource Management Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Infrastructure Deployment Professional - Maximo Asset Management</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Managements Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Administrator - Db2 12 for z/OS</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#f2dcdb; border-color:black; width:141.0pt\">\n\t\t\t<p>Database Managements Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:248.1pt\">\n\t\t\t<p>IBM Certified Administrator - Netezza Performance Server</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:5.0cm\">\n\t\t\t<p>Database Administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#f2dcdb; width:35.45pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#c2d69b; border-color:black; width:141.0pt\">\n\t\t\t<p>Digital Marketing Skills</p>\n\n\t\t\t<p>e-Commerce Skills</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c2d69b; width:248.1pt\">\n\t\t\t<p>Google Digital Marketing &amp; E-commerce Professional Certificate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c2d69b; width:5.0cm\">\n\t\t\t<p>Digital Marketer, Marketing Coordinator, E-commerce Associate</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c2d69b; width:42.5pt\">\n\t\t\t<p><strong>✔</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c2d69b; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#c2d69b; width:35.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Certification Level Key: </strong></p>\n\n<p><strong>E/A/F</strong> &ndash; Entry/Associate/Foundation; <strong>I</strong> &ndash; Intermediate; <strong>E/P/S</strong>- Expert/Professional/Specialty (Specialist)</p>\n\n<p>&nbsp;</p>\n\n<p>[1] Participating member states are undertaking basic and intermediate-level digital skills training programs through National Project Implementation Units (PIUs) aimed at improving digital literacy among the population.</p>\n\n<p>[2] Training should be available virtually and face-to-face</p>"},{"id":"OP00270739","notice_type":"Request for Expression of Interest","noticedate":"30-Jan-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-02-12T00:00:00Z","submission_deadline_time":"11:00","project_ctry_name":"India","project_id":"P168590","project_name":"Tamil Nadu Housing and Habitat Development Project","bid_reference_no":"IN-TNSCB-402241-CS-QCBS","bid_description":"Procurement of System Integrator (SI) for services to Design, Develop, Implement and Maintain Enterprise Resource Planning (ERP) System for TNUHDB","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Chennai, Tamil Nadu","contact_ctry_name":"India","contact_email":"tnuhdbprocurement@gmail.com","contact_name":"Superintending Engineer","contact_organization":"Tamil Nadu Urban Habitat Development Board","contact_phone_no":"+914428443375","submission_date":"2024-01-30T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;REQUEST FOR EXPRESSIONS OF INTEREST&nbsp;</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p><strong>India</strong></p><p><strong>Tamil Nadu Housing and Habitat Development Project</strong></p><p>Loan No./Credit No./ Grant No.: 9094-IN</p><p>&nbsp;</p><p><strong>Assignment Title</strong><strong>: <strong>Procurement of System Integrator (SI) for Services to Design, Develop, Implement and Maintain e-Governance System for Tamil Nadu Urban Habitat Development Board</strong></strong></p><p>&nbsp;</p><p><strong>Reference No</strong><strong>:</strong><strong> </strong>IN-TNSCB-402241-CS-QCBS</p><p>Tamil Nadu Urban Habitat Development Board (TNUHDB) is implementing the Tamil Nadu Housing and Habitat Development Project financed by the World Bank and intends to apply part of the proceeds for consulting services.</p><p><em>Objective and Scope of Work:</em></p><p><em>TNUHDB intends to hire a Consulting firm (System Integrator) to design, develop, implement, operate, and maintain an Integrated Enterprise Resource Planning (ERP) and digital solution for TNUHDB to enhance the operations and transform the service delivery to its stakeholders while realizing the vision of &ldquo;a slum free city and upliftment of the urban poor and habitation&rdquo;. </em></p><p>The detailed scope of work of the consultancy services is indicated in TOR (Copy as attached)</p><p>Also the detailed Terms of Reference (TOR) for the assignment can be found at the following website:www.tnuhdb.tn.gov.in<u>.</u></p><p><strong>Duration of Assignment</strong></p><p>The duration of the assignment for building the ERP is (12 months + 2 months for stabilization) and a period of 36 months operation &amp; Maintenance from the date of commissioning of ERP.</p><p>The Tamil Nadu Urban Habitat Development Board, Government of Tamil Nadu now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their Expression of interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>The short-listing criteria are</strong><strong> in the Table below. </strong><strong>The lists of documents regarding the Eligibility Criteria of the firm to be submitted along with the Expressions of Interest are in the Table below:</strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\"><thead><tr><td style=\"background-color:white; width:26.7pt\"><p><strong>S. No</strong></p></td><td style=\"background-color:white; width:211.55pt\"><p><strong>Eligibility Criteria</strong></p></td><td style=\"background-color:white; width:3.25in\"><p><strong>Supporting documents for fulfilling the Eligibility Criteria</strong></p></td></tr></thead><tbody><tr><td style=\"height:49.9pt; vertical-align:top; width:26.7pt\"><p>1</p><p>&nbsp;</p></td><td style=\"height:49.9pt; vertical-align:top; width:211.55pt\"><p>The Firm should be a company registered under the provisions of the Indian Companies Act, 1956/2013 or a partnership firm registered under the Indian Partnership Act1932 or the Limited Liability Partnerships Act, 2008.</p><p>(Applicable for Indian firms). For firms registered outside India, onus will be to demonstrate that the legal structure of the firm complies with internationally accepted good practices and the Indian provisions mentioned above.</p><p>&nbsp;</p><p>Firm should have GST registration. (Applicable for Indian firms)</p><p>&nbsp;</p><p>Firm should have been operational for the last 10 (Ten) years.</p><p>&nbsp;</p></td><td style=\"height:49.9pt; vertical-align:top; width:3.25in\"><p>Copy of Certificate of Incorporation or Copy of LLP firm registration certificate, as applicable.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Copy of Goods and Services Tax (GST) certificate with GST registration number (GSTIN)</p><p>&nbsp;</p><p>&nbsp;</p><p>Copy of PAN Card(Applicable for Indian firms)</p><p>&nbsp;</p><p>In addition, for JV Partner bids</p><p>&bull; The Signed JV Partner Agreement clearly stating:</p><p>&minus; Roles and responsibilities of each member</p><p>&minus; The Lead Firm shall have maximum Stake in the JV Partner</p><p>&minus; The Lead Firm shall be responsible and jointly &amp; severally liable under this RFP Terms for:</p><p> The delivery of products &amp; services</p><p> Successful completion of this entire Project</p><p> Compliance with the SLAs</p><p>&bull; Authorization by authorized signatories of JV Partner members authorizing the Lead Firm to bid on their behalf for this RFP</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>2</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm (JV Partner) should be certified in all.</p><ul><li>CMMI Level 3 or above</li><li>ISO 9001:2008 or above &ndash; for Quality Process</li><li>ISO 20000:2011 or above for IT Service Management</li><li>ISO 27001:2005 or above for Information Security Management System</li></ul></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of the requisite certificates should be enclosed.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>3</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>Board resolution / Power of attorney in favour of authorised signatory</p><p>&nbsp;</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of Power of attorney with appropriate supporting documents</p><p>Power of attorney in favour of the lead member</p><p>In case of JV Partner, the members shall submit a power of attorney in favour of the lead member.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>4</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have a positive net worth in each of last three (3) financial years (FY 2020-2021, FY 2021-2022, FY 2022-2023)</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Certificate from the Statutory Auditor clearly stating the net worth</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>5</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have an average annual turnover of Rs.60Crore and above, in each of the last three (2020&mdash;21, 2021-22&amp; 2022-23) audited financial years.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Financial turnover Statement from CA along with Profit &amp; Loss statements</p><p>Certificate from the statutory auditor clearly stating the total turnover.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>6</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm shall have local office in Chennai.</p><p>&nbsp;</p><p>If Firm does not have a local office in Chennai, an Undertaking is required indicating willingness to open a local office in Chennai within 30 days of signing of the contract.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of the Proof/Rental Agreement &amp; GST be submitted along with office Pictures.</p><p>&nbsp;</p><p>Undertaking letter</p><p>&nbsp;</p><p>.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>7</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have the project experience of development, implementation and maintenance of a workflow-based ERP/IT applications and portal implemented/ongoing in public or private sector in India over the last seven (7) years, indicating the works completed with their value and percentage of work completion along with the total contract value if on-going works. This excludes the cost of procurement, deployment, and maintenance of infrastructure.</p><p>&nbsp;</p><ul><li>At least one (1) such project of value more than INR 10 Crore</li><li>At least two (2) such projects each of value more than INR 5 Crore</li><li>At least five (5) such projects each of value more than INR 2 Crore</li></ul></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of work order and Completion certificate(s) from the client (Completed or Ongoing)</p><p>and</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)</p><p>&nbsp;</p><p><strong>Note:</strong><br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation</p></td></tr><tr><td style=\"height:60.25pt; vertical-align:top; width:26.7pt\"><p>8</p></td><td style=\"height:60.25pt; vertical-align:top; width:211.55pt\"><p>The Firm should not be under a declaration of in-eligibility for corrupt, fraudulent or any other unethical business practices and should not be debarred or blacklisted by World Bank.</p></td><td style=\"height:60.25pt; vertical-align:top; width:3.25in\"><p>Undertaking on company&#39;s letter head signed by company&rsquo;s authorized signatory</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>9</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have financial capability to handle the services by mobilizing Rs.25 lakhs per month in advance to disburse payment to the resources deployed for at least Two months (Rs. 50 Lakhs) without awaiting payment from TNUHDB.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Any Scheduled Banker&rsquo;s certificate to this effect to be produced/ Declaration</p></td></tr><tr><td style=\"height:79.85pt; vertical-align:top; width:26.7pt\"><p>10</p></td><td style=\"height:79.85pt; vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in documents digitization of at least 50 lakh pages during the last seven (7) years.&nbsp;</p></td><td style=\"height:79.85pt; vertical-align:top; width:3.25in\"><p>Scope of Work Document along with the detailed agreement copy.</p><p>and&nbsp;</p><p>Certificate(s) from the client related to Document Digitalization (Completed or phase completed)</p><p>and</p><p>Certification by Statutory Auditor or independent auditor (Completed or phase completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation.&nbsp;</p></td></tr><tr><td style=\"height:93.1pt; vertical-align:top; width:26.7pt\"><p>11</p></td><td style=\"height:93.1pt; vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in IT projects establishing Data Centre or Disaster Recovery Centre with facility management services of comparable scope and magnitude during the last seven (7) years from the date of submission of bid.</p></td><td style=\"height:93.1pt; vertical-align:top; width:3.25in\"><p>Copy of work order&nbsp;</p><p>and&nbsp;</p><p>Completion certificate(s) from the client (Completed or phase completed)&nbsp;&nbsp;</p><p>and&nbsp;&nbsp;</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>12</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in IT projects (completed) including setting up Local Area Network (LAN) infrastructure during the last seven (7) years from the date of submission of bid</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of work order&nbsp;</p><p>and&nbsp;</p><p>Completion certificate(s) from the client (Completed)&nbsp;&nbsp;</p><p>and&nbsp;&nbsp;</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation</p></td></tr></tbody></table><p><strong>Note</strong>: Firms submitting documentation which are not in Indian rupees (contracts, work orders, certificates, etc.), in their EOIs, conversion of the local currency into Indian Rupees should be done to facilitate review of REOI using currency conversion rate of the date of advertisement of the REOI.</p><p>The Firm must provide the following additional details also:</p><ol><li>Name, address, e-mail, telephone along with a note on the ownership, organizational structure, and core business area of the consulting firm.</li><li>A short write-up on technical and managerial capability of the firm for undertaking the assignment but without submission of individual key experts&rsquo; bio data.</li></ol><p>&nbsp;</p><p><strong>Note: Key Experts will not be evaluated at the short-listing stage of EoI.</strong></p><p>Consultant firm may submit other documents considered important, which are not listed above, to justify general qualifications and qualifications relevant to the assignment.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s prevailing &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016,(&ldquo;Procurement Regulations&rdquo;) as amended 20 November 2020, &nbsp;setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a JV Partner and/or a sub-consultancy. In the case of a JV Partner, all the partners in the JV Partner shall be jointly and severally liable for the entire contract, if selected.</p><p>As per the Government of Tamil Nadu directions, all procurement activities should be processed through Government e-Procurement portal www.tntenders.gov.in.</p><p>The preferred Consulting firm will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations of World Bank.</p><p>Further information can be obtained at the address below during office hours i.e.10:00 AM to 5:45 PM. (Except holidays)</p><p>Expressions of interest must be delivered through e procurement portal on or before <strong>12.02.2024 </strong>up to <strong>11.00</strong><strong> </strong><strong>AM Indian Standard Time</strong>.</p><p><strong><u>Attention</u></strong>:</p><p>Superintending Engineer,</p><p>Project Monitoring Unit - World Bank Project</p><p>Tamil Nadu Urban Habitat Development Board,</p><p>No.5, Kamarajar Salai,</p><p>Chennai &ndash; 600 005,&nbsp;</p><p>Tamil Nadu, India,</p><p>E-mail: <u>tnuhdbprocurement@gmail.com</u></p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; TERMS OF REFERENCE&nbsp;</strong></p><p><strong>Terms of Reference&nbsp;for Selection of System Integrator (SI) for Implementation of Enterprise Resource Planning (ERP) and Digital Platform for TNUHDB</strong></p><p><strong>January 2024 </strong></p><p>&nbsp;</p><p><strong>Table of Contents</strong></p><p>Background. 5</p><p>Objective. 5</p><p>Overview of Scope of Work for System Integrator 5</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Firm Capability. 10</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Team Compositions. 11</p><p>2.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Implementation team composition. 11</p><p>2.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operation &amp; maintenance (Data Centre) support team.. 17</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Capacity-building program.. 23</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project deliverables / Timeline / Payment schedule. 24</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance to Standards. 25</p><p>5.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adherence to Open-Source Standard. 25</p><p>5.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance with Government standards &amp; policies. 25</p><p>5.3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance with Industry Standards. 25</p><p>5.4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Single-Sign On. 26</p><p>5.5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Support for PKI based Authentication and Authorization. 26</p><p>5.6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interoperability Standards. 26</p><p>5.7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scalability. 26</p><p>5.8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Security. 26</p><p>5.9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application Architecture. 29</p><p>5.10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Proposed Application Architecture. 30</p><p>5.11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; High Level Design (HLD) 30</p><p>5.12.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Detailed (Low Level) Design (LLD) 30</p><p>5.13.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Test Plan. 30</p><p>5.14.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Specification. 30</p><p>5.15.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Non-Functional Requirements. 31</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data, local services, personnel, and facilities to be provided by the Borrower 34</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operation and maintenance. 35</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Institutional and organization arrangements. 35</p><p>8.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Stakeholders. 35</p><p>8.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Governance Structure. 35</p><p>8.3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communication Protocols 36</p><p>8.4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Progress Reports/ Reports/Notes. 36</p><p>8.5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communication medium.. 37</p><p>8.6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Submission of Work Outputs. 37</p><p>8.7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Quality Assurance Plan. 37</p><p>8.8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change management and risk management 37</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Commencement Date. 37</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Period of Contract 37</p><p>11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting arrangement 38</p><p>Annexure I&nbsp; - Solution / Implementation Approach. 39</p><p>Annexure II- Track 1: Application design, development, and implementation. 40</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Application Development 40</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Administration - User Management, Workflow management, Audit-Trail 50</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mobile application. 51</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design, Develop and Implement the TNUHDB Information Portal 53</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design and Development of Mobile Application. 54</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; System Architecture. 55</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Internet and Intranet Enabled. 57</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Graphical User Interface. 57</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Workflow Integration Approach. 58</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Installation/ Upgrade/ Enhancement 59</p><p>11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <em>Scalability</em>. 59</p><p>12.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Security. 60</p><p>13.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; System Control and Audit 63</p><p>14.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data Backup/ Data Archival/ Restore. 64</p><p>15.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Database. 64</p><p>16.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Enterprise Monitoring System (EMS) 65</p><p>17.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operations. 73</p><p>18.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stages of Application Development 74</p><p>Annexure III - Track 2: Data digitalization. 79</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Documents scanning and digitalization requirements. 79</p><p>Annexure IV - Track 3: IT Infrastructure procurement, supply, Installation, and bandwidth for the project 83</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT Infrastructure Requirements. 83</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT infrastructure deployment plan. 85</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cloud Hosting. 86</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Local Area Network. 89</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Network Operation Centre (NOC) 90</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Internet Infrastructure and Connectivity. 92</p><p>Annexure V - Track 4: Training and Capacity Building. 95</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Introduction. 95</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Training requirements. 96</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Training Effectiveness. 98</p><p>Annexure VI- Track 5: Operations and Maintenance. 99</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Applications Support and Maintenance. 99</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT Infrastructure Support and Maintenance. 101</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance to SLA. 109</p><p>Annexure VII - Governance Structure and Responsibility. 111</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Leadership Team.. 111</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Implementation Committee (PIC) 111</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Tamil Nadu Urban Habitat Development Board (TNUHDB) is implementing the Tamil Nadu Housing and Habitat Development Project (TNHHP) financed by the World Bank. TNUHDB intends to engage System Integrator (SIs) for Design, Develop, Implement an ERP and digital platform for TNUHDB board and service delivery to citizens and for Operations and maintenance of solutions.</p><p>Primary objective of TNUHDB is to provide housing for urban poor. TNUHDB services are in green field development, in-situ upgradation, and reconstruction. Housing schemes provided by TNUHDB are &ldquo;In-Situ&rdquo; Slum Redevelopment (ISSR), Affordable Housing in Partnership (AHP), Subsidy for Beneficiary &ndash; Led individual house construction (BLC), Promotion of Affordable Housing for weaker sections through Credit Linked Subsidy Scheme (CLSS). Under Housing for All (HFA - Urban), TNUHDB is designated as the implementing agency for AHP and BLC schemes.</p><p>Functions of TNUHDB are carried out by functional divisions namely, Technical, Administration and Establishment, Finance and Accounting. The technical division is headed by Chief Engineers (CE) and is assisted by Superintending Engineers (SE). The Secretary manages the administration and establishment division while the Financial Advisor is responsible for the finance and accounting division. The Project Management Unit (PMU) headed by the Joint Managing Director/Project Director, handles the Externally aided Project Financed by MDBs such as the World Bank (WB) and Asian Development Bank (ADB). The TNUHDB functions are distributed to the wings, and each wing is supported by sectional units and staff. TNUHDB has its Board office at Chennai and is supported by two (2) Regional Offices, four (4) Circle Offices in Chennai and one (1) Circle Office each in Madurai and Coimbatore and 21 Divisional Offices across the State.</p><p><strong>Objective</strong></p><p>TNUHDB intends to hire an agency (System Integrator) to design, develop, implement, operate, and maintain an Integrated Enterprise Planning (ERP) and digital solution for TNUHDB to enhance the operations and transform the service delivery to its stakeholders while realizing the vision of&rdquo; a slum free city and upliftment of the urban poor and habitation&rdquo;.</p><p>&nbsp;</p><p><strong>Overview of Scope of Work for System Integrator</strong></p><p>The scope of work envisaged for the System Integrator comprises of following key activities.</p><ol><li>Application Design, Development, and Implementation</li><li>Cloud Hosting, IT &amp; Network infrastructure and End user computing</li><li>Data digitization</li><li>Experience Centre and citizen kiosks setup</li><li>Help desk setup and operations</li><li>Training and capacity building</li><li>Operation and maintenance</li></ol><p>The key activities are detailed below:</p><ol><li><strong>Application Design, Development, and Implementation</strong></li></ol><ul><li>The scope of work will comprise development of following components:<ul><li><strong>Integrated Project Management System (PMS)</strong> for technical wing to carry out the functions of Land identification, finalization, alienation, DPR preparation, planning, works procurement, contract management and monitoring, Allotment and maintenance of tenemental schemes</li><li><strong>Enterprise Resource Planning (ERP)</strong> System with Estate management, office administration, Accounting and Finance and Human resource management.</li><li><strong>Employee Portal</strong> with Task dashboard, Knowledge Management System (KMS), Learning Management System (LMS), Management Information System</li><li><strong>Citizen portal</strong> with online citizen / beneficiary services, Grievance Redressal Management, Community Development Information System, Housing need assessment survey, Documentary Repository</li><li><strong>Enterprise Support Applications</strong> with Document Management System, Content management system, GIS mapping, Business intelligence and analytics platform &amp; MIS Dashboard, Help desk support</li></ul></li><li>Procurement and deployment of application specific support tools and software for 2D and 3D planning, designing, modelling, Structural designing and analysis of building systems, Estimation of quantities and cost analysis</li><li>Bring in the functional requirements of the ERP and digital platform of TNUHDB in the solution offering and serve the broad functions of technical wing covering workflow management, project monitoring and control, task scheduling, resource and material management, collaboration, tracking, dashboard and reporting</li><li>Designing of Integrated solution architecture for application design and development</li><li>Applications developed must support access to TNUHDB users across different locations via LAN, WAN and internet with secured connectivity and support all related protocols</li><li>Graphical user interface (GUI) must be user friendly, interactive, and efficient and have responsive design, support document uploading, indexing, referencing of scanned and digitized files in the application system and data repositories</li><li>System design must provide for seamless integration of current and new applications within its architecture with minimal impact and changes. Be fully integrated across modules and functional areas Identify the data/ services which is to be exchanged between the application and other internal/ external systems.</li><li>Apart from cross platform integration, system must be integrated with other services such as Digital signature, E-office, E-procurement &amp; gateway services such as SMS and email.</li><li>In longer run system must address the integration requirement with various government departments such as Housing department, RERA, DTCP, Collectorate, GCC and CMWSSB etc. for exchange of information on housing projects and other functions.</li></ul><p><strong>Application development phases:</strong></p><ul><li><strong>Design Phase</strong> &ndash; Requirement gathering, Preparation of Software Requirement Specification (SRS), High Level Design (HLD) and Low-Level Design (LLD)</li><li><strong>Development and Testing phase</strong> &ndash; Development of modules, Testing of modules, User Acceptance Test (UAT) and Go-Live of applications</li><li><strong>Operation and Maintenance (O&amp;M) phase</strong> &ndash; O&amp;M of applications for all users, Resolution of errors and bugs, change management</li></ul><p>&nbsp;</p><ol><li><strong>Cloud Hosting, IT, Network infrastructure and End user computing</strong></li></ol><ul><li><strong>Cloud Hosting:</strong><ul><li>Hosting of All Applications, Digitized Data and Users Data on Cloud Environment</li><li>Managed Storage, Network Services As required</li><li>Containerization and Orchestration Services for Container Based Deployment</li><li>High Availability &amp; Disaster Recovery Site with Hot Standby</li><li>Provisioning of required bandwidth for seamless data flow between DC and Disaster recovery site</li><li>Implement Data backup and replication policies</li><li>Coordination with Cloud service provider for provisioning required compute, storage &amp; network services for running the application efficiently</li><li>Provision for all Environments (development, test, staging and production) on DC and Cloud DR.</li><li>Supply, deploy &amp; configure Enterprise Monitoring Support (EMS) tools to TNUHDB for remotely Monitoring all resources during implementation and operation &amp; maintenance period and support the proposed hardware and software components at Cloud DC and DR. It must support configuration Management, Fault and incident Management, Asset management</li></ul></li></ul><p>&nbsp;</p><ul><li><strong>Networking:</strong><ul><li>Revamping of LAN with Fiber backbone.</li><li>1 GBPS Throughput of Network for Board office</li><li>Head office to Estate and regional office connectivity over VPN</li><li>Wireless Connectivity to Users across all the offices</li></ul></li><li><strong>Security and Monitoring:</strong><ul><li>Firewalls &amp; Intrusion prevention system for Securing the network, Internal Segmentation Based on Type of Users</li><li><strong>Antivirus for end users</strong> and Enterprise Monitoring System for monitoring network, server &amp; applications resources</li><li>Creating Active Directory/Domain Controller, DHCP, Contact Centre Hosting at Central Location</li></ul></li><li><strong>End user Infrastructure:</strong><ul><li>Provisioning needs-based end use compute with basic software suites such as Microsoft Office,</li><li>Special compute requitement for Engineering Division to access the 3D Drawings and editing tools</li><li>Multifunction Devices to each Wing or Division</li><li>Plotter and Large Printer at Head office as a central resource</li></ul></li><li><strong>Software Tools:</strong><ul><li>Software tools for Structural analysis, BIM, 2D &amp; 3D CAD</li><li>Helpdesk and Contact Centre Set up Voice and Non voice Support like Chatbot, Email and Physical Submission</li><li>SMS &amp; Email Services for Users, Citizen Kiosk for Citizens at Offices.</li></ul></li></ul><p>&nbsp;</p><ol><li><strong>Data Digitization:</strong></li></ol><ul><li>There are approximately 50 Lakh physical records to be digitized. Documents to be digitized include allotment orders, sale deeds, Land documents, scheme proposals and documents, applications forms, survey drawings, sketches, Layout plans, structural drawings, test reports, planning permissions, NoC&rsquo;s, clearances obtained, Government orders, enumeration and survey reports.</li><li>Confidential documents of TNUHDB shall be scanned and digitalized at TNUHDB&rsquo;s premise. TNUHDB shall provide the space for the same.</li><li>Non-confidential documents of TNUHDB can be scanned and digitalized at SI&rsquo;s premise.</li><li>To undertake steps of digitization &ndash;<ul><li><strong>Initiation</strong>: Deployment of IT infrastructure &ndash; Scanners, cameras, printers, secure access devices, Deployment of manpower for digitization</li><li><strong>Pre-scanning</strong>: Collection of documents (files, papers, books), pre-processing of documents, classification of records</li><li><strong>Data entry</strong>: Generation of checklist, MIS data entry, Document status entry</li><li><strong>Document scanning:</strong> Scanning of documents, required image correction</li><li><strong>Post &ndash; scanning:</strong> Handover binding of books / files, Bar code generation and pasting, Quality check of scanned documents, Image enhancement, TPA quality, archival of electronic documents and backup</li><li><strong>Indexing:</strong> Meta data entry, Indexing based on defined parameters, Handing over print-out of indexing files for Quality check</li><li><strong>Storage upload:</strong> Upload of scanned documents and index files into the storage device in storage devices in DC/DR. Integration of scanned DB and index files with ERP and digital applications.</li><li><strong>Training:</strong> Training to TNUHDB users and staff</li></ul></li></ul><p>&nbsp;</p><ol><li><strong>Experience center and Citizen Kiosk setup</strong></li></ol><ul><li><strong>Experience center:</strong> TNUHDB intends to build an Experience Centre within Board office building for providing digital experience to various stakeholders and Citizens visiting the office. This experience centre shall elevate the digital experience of Citizens through various audio-visual content about TNUHDB and their housing schemes, completed and ongoing projects, take feedback from beneficiaries of housing schemes</li><li>To fit, establish Experience Centre with IT hardware such as video wall, projector, projector screen, sound system, tablets, printers, fire security systems and non-IT infrastructure such as civil work, interiors, furnishing. Detailed requirements of IT and Non-IT components of Experience Center are provided in the RFP.&nbsp;&nbsp;</li><li><strong>Citizen Kiosks:</strong> TNUHDB intends to set up Citizen Service Kiosk at various Citizen Interface Points. These Citizen Kiosk would be offering various Services through interactive user interface such as application tracking, complaint or grievance registration, tracking of grievances or complaints, Information on various schemes, eligibility checking and allotment list of housing schemes. Also, services like online payment collection, online receipt generation can be offered through such Kiosks.</li><li>To consult with TNUHDB officials and design an interactive user interface for Citizen Kiosk which shall offer the listed services</li><li>SI shall procure the required hardware and house the entire system in an enclosure for outdoor deployment such as Estate offices, Citizen Service Centers, designated Scheme tenemental areas. If required Canopies can be considered</li></ul><p>&nbsp;</p><ol><li><strong>Help desk setup and operations</strong></li></ol><ul><li>Helpdesk Support for various Citizen / Beneficiary Services offered by TNUHDB information Portal, Support to Citizens seeking Information about schemes and projects undergoing.</li><li>Support both Voice and Non-Voice Support system as per convenience of Citizen. Voice operations must have trained agents and ticketing tool to register and generate ticket ID.&nbsp; Non voice support must be able to collect grievance and complaints from web portal chat bot, Email through mobile application and physical submissions.</li><li>For voice support required components such as IP Exchange, contact centre application, Voice logger and gateways etc. must be considered&nbsp;</li><li>It must have helpdesk application linked with TNUHDB Portal and Mobile application to log issues online through web and mobile</li><li>Helpdesk support in multilingual &ndash; Tamil, English and have Interactive Voice Response (IVR) system for first level of call segregation</li><li>In addition to the telephone call, the SI shall also provide other two-way integrated communication channels for call logging, like portal, chat app, email, and SMS for speedy query resolution and to manage all the communications across channels in one place no matter how users contacted the helpdesk.</li><li>MIS entry of All grievances &amp; interlink with individual performance of employees</li><li>SI should Impart trainings (on applications, IT Infrastructure, soft skills, call handling procedures and others) to Customer Service Executive and Supervisors with documentations &ndash; Help manuals, training manuals, video tutorials</li><li>Reports &ndash; Incident logs, Incidents escalated, SLA compliance/non-compliance, calls per week, month, or another period, calls for each interaction tracked by type, number of dropped calls after answering and others</li><li>Development of training material for CSEs and supervisors</li><li>Provision of Call Center application including CRM on services model</li><li>Development of standard operating procedures with call prioritization guidelines, problem security codes and escalation procedures etc. in consultation with TNUHDB</li></ul><p>&nbsp;</p><ol><li><strong>Training and Capacity Building</strong></li></ol><ul><li>Provide training to stakeholders, on the usage and maintenance of TNUHDB applications like PMS, ERP, Employee and Citizen portal &amp; mobile application, Solution System, DC, Cloud DR, LAN, FTTP Network, Helpdesk and Experience Centre.</li><li>Design a calendar of training activities, for various solution components of the TNUHDB project</li><li>The calendar designed shall identify the type of training (comprehensive competency-based training), topics to be covered and the details on trainee, trainer, and the venue</li><li>System integrator to arrange training with required infrastructure along with providing the training plan, training content &amp; the training delivery and bear the cost for the same.</li><li>Types of Training: Administrative and Project related, Functional, Technical (Application and Infrastructure)</li></ul><p>&nbsp;</p><ol><li><strong>Operation &amp; Maintenance:</strong></li></ol><ul><li>Operate and maintain all the components of this project after Go-Live date for the period. During O&amp;M phase, SI to ensure that service levels are monitored on continuous basis; service levels are met and are reported to TNUHDB</li><li><strong>Application Support and Maintenance</strong> &ndash; Compliance to SLA, Annual Technology support, Application Software Maintenance, Change and version control, Impact analysis, maintenance of configuration information, Training, maintain system documentation</li><li><strong>IT Infrastructure support and maintenance &ndash; </strong>warranty support for deployed IT infrastructure, Maintenance of IT infrastructure, management of servers, network infrastructure, experience centre, Kiosk. System administration and network monitoring, security management</li></ul><p>&nbsp;</p><p>The key components of the scope of work are further detailed in Annexure I</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Firm Capability</strong></li></ol><p>System Integrators (Firm) is required to have experience, expertise and technical capability to carryout activities successfully.</p><ul><li>The Firm must be registered in India and shall be in similar field during the last 10 years.</li><li>Firm must have prior experience of engagement in implementation of project with any Central Government / State Government or any Public Sector undertaking, within India on ERP, e -Governance, Software development projects of at least one (1) such project of value more than INR 10 Crore, two (2) such projects each of value more than INR 5 Crore and at least five (5) such projects each of value more than INR 2 Crore during the last 7 years</li><li>Have experience of large successful ERP and software Go-Live / completed project.</li><li>Have Professionally qualified full-time employees in ERP system development and maintenance.</li><li>Have local office presence in Chennai. If the Bidder is not having an Office in Chennai, a necessary undertaking letter to open the Office in Chennai within 30 days of signing the agreement should be submitted.</li><li>Have Certifications: CMMI, ISO 9001:2008, ISO 20000:2011, ISO 27001:2005</li></ul><p>Have experience in solution design, development and maintains services for:</p><ul><li>Enterprise Resource Planning (ERP) covering Administration, Establishment, Human resources, Accounting and Finance functions.</li><li>Project Management System with engineering and planning, contract management, works monitoring functions.</li><li>Citizen portal and online service delivery</li><li>Workflow based application.</li><li>ERP Integration with external application</li><li>Mobile application for operation functions, monitoring and service delivery</li><li>Data Centre Infrastructure Support and Maintenance Services</li><li>Cloud hosting and managed services</li><li>IT hardware and Network infrastructure design, deployment, maintenance services</li><li>IT Application Support and application Maintenance Services&nbsp;&nbsp;</li><li>Payment gateway integration or any other third-party integration services</li><li>Application performance monitoring / management</li><li>GIS mapping, user and asset management services</li><li>Data digitization, data migration services</li><li>Helpdesk and support services</li></ul><p>&nbsp;</p><ol><li><strong>Team Compositions </strong><ol><li>Implementation team composition</li></ol></li></ol><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:683.75pt\"><thead><tr><td style=\"height:14.35pt; vertical-align:top; width:106.8pt\"><p><strong>Position </strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:234.95pt\"><p><strong>Qualification / Experience</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:225.0pt\"><p><strong>Rolls &amp; Responsibilities</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:67.5pt\"><p><strong>Person Months</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:49.5pt\"><p><strong>Home/ Field</strong></p></td></tr></thead><tbody><tr><td style=\"height:96.0pt; vertical-align:top; width:106.8pt\"><p><strong>Program Manager / Team Leader</strong></p></td><td style=\"height:96.0pt; vertical-align:top; width:234.95pt\"><ol><li>Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent<br />c) Experience: Should possess at least 12 years of experience in IT domain.<br />d) Project Experience: i. Should have at least 3 projects of similar scope as Program manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or autonomous bodies or public sector undertakings or other government organization<br />&nbsp;</li></ol></td><td style=\"height:96.0pt; vertical-align:top; width:225.0pt\"><ul><li>Team Leader is responsible for setting&nbsp;clear goals and objectives to ensure the team&#39;s success.</li><li>Define objectives and&nbsp;key results&nbsp;aligned with the team&#39;s overall goals.</li><li>Responsible for monitoring their teams&#39; progress throughout the entire project and resolving any issues that arise during the project.</li><li>Responsible for ensuring open communication among team members.</li><li>Responsible for leading regular&nbsp;team meetings&nbsp;to ensure that all team members have an open line of communication and can stay up-to-date on their progress</li></ul></td><td style=\"height:96.0pt; vertical-align:top; width:67.5pt\"><p>12</p></td><td style=\"height:96.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:71.5pt; vertical-align:top; width:106.8pt\"><p><strong>Project Manager, Software</strong></p></td><td style=\"height:71.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent<br />c) Experience: Should possess at least 10 years of experience in IT domain including Software development and implementation<br />d) Project Experience: i. Should have at least 3 projects of similar scope as Project manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization. iii. Should have managed a team of 30+ software developers iv. Should have experience in prevalent project methodologies e.g., Agile<br />&nbsp;</p></td><td style=\"height:71.5pt; vertical-align:top; width:225.0pt\"><ul><li>Identify infrastructure goals and project delivery clearly.</li><li>Planning out the blueprints for software projects, including defining the scope, allocating resources, setting deadlines, laying out communication strategies, and indicating tests and maintenance.</li><li>Identify prime risks and limitations within project plan.</li><li>Participating in and supervising each stage of the project.</li><li>Ensuring project stays on schedule and adheres to the deadlines.</li><li>Determining and overseeing consistent testing, evaluation, and troubleshooting of all products in all stages of completion</li><li>Tracking milestones, deliverables, and change requests.</li><li>Delivering completed software products to clients and performing regular checks on the products&#39; performance.</li></ul><p>&nbsp;</p></td><td style=\"height:71.5pt; vertical-align:top; width:67.5pt\"><p>9</p></td><td style=\"height:71.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:22.0pt; vertical-align:top; width:106.8pt\"><p><strong>Project Manager, Infrastructure &amp; Network </strong></p></td><td style=\"height:22.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: OEM or Industry Standard certification in Infrastructure Management. E.g., ITIL V.3, ISO 20000, and others<br />c) Experience: Should possess at least 10 years of experience in IT infrastructure domain<br />d) Project experience: i. Should have at least 3 projects of similar scope as Project manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization iii. Should have managed a team of 20+ resources iv. Experience in setting up an IT ecosystem from scratch would be an added advantage.</p><p><br />&nbsp;</p></td><td style=\"height:22.0pt; vertical-align:top; width:225.0pt\"><ul><li>Assessing the requirements of the project and recommending suitable IT components</li><li>Analyzing different options and recommending the most suitable for the project economically feasible</li><li>Work on improving the IT infrastructure.</li><li>Recommend upgrades and new systems that will be more useful for the project</li><li>Formulating procedures and policies for optimum utilization of IT infrastructure resources</li><li>&nbsp;Supervising IT staff, consultants, vendors and suppliers</li><li>&nbsp;Meeting with managers of different departments and assessing IT infrastructure needs.</li><li>Meeting with IT analysts and finalizing essential IT infrastructure</li><li>&nbsp;Planning and supervising installation of IT infrastructure</li><li>Making sure that the infrastructure development project is completed within the given time frame</li></ul></td><td style=\"height:22.0pt; vertical-align:top; width:67.5pt\"><p>9</p></td><td style=\"height:22.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:108.5pt; vertical-align:top; width:106.8pt\"><p><strong>Solution Architect</strong></p></td><td style=\"height:108.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or&nbsp; B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Industry standard certifications like TOGAF, Scrum Master, CISSP (Architecture) and others<br />c) Experience: Should possess at least 8 years of experience in IT domain for at least 5 years of experience as Solution Architect<br />d) Project experience: Should have at least 2 projects of similar scope as Solution Architect in large projects</p></td><td style=\"height:108.5pt; vertical-align:top; width:225.0pt\"><ul><li>Designing, modifying, and testing technical architecture</li><li>Provide supervision and guidance to development teams<br />Continually research the current and emerging technologies and propose changes where needed.</li><li>Inform various stakeholders about any issues with the current technical solutions being implemented.</li><li>Assess the business impact that certain technical choices have.</li><li>Provide updates to stakeholders on product development processes, costs, and budgets</li></ul><p>&nbsp;</p></td><td style=\"height:108.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:108.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:40.0pt; vertical-align:top; width:106.8pt\"><p><strong>Database Expert </strong></p></td><td style=\"height:40.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology from a reputed University or College or Institute<br />b) Certifications: Certified DBA<br />c) Experience: Should possess at least 8 years of experience in IT domain for at least 5 years in Database architecting or design in large scale projects of similar nature<br />d) Project experience: i. Should have at least 2 projects of similar scope as Database architect ii. Should have experience in database activities like instance tuning, schema management, space management, backup and recovery, disaster recovery, data replication, database refresh and others. iii. Have experience in open-source databases.</p><p>&nbsp;</p></td><td style=\"height:40.0pt; vertical-align:top; width:225.0pt\"><ul><li>Designs database systems and management tools.</li><li>Installs, updates, and maintains computer databases.</li><li>Assesses database performance by developing protocols to measure results and identify problem areas.</li><li>Supports database performance by monitoring, evaluating, and resolving processing and programming problems.</li><li>Secures database by preparing access and control policies and procedures and implementing disaster recovery procedures.</li><li>Supports application design by contributing expertise to operations and technical support teams.</li><li>Provides technical support to employees.</li></ul></td><td style=\"height:40.0pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:40.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:22.0pt; vertical-align:top; width:106.8pt\"><p><strong>Operations Manager</strong></p></td><td style=\"height:22.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;with preferably MBA degree from a reputed University or College or Institute<br />b) Certifications: ITIL v3<br />c) Experience: Should possess at least 10 years of experience for at least 5 years in maintenance and operations of large IT setups<br />d) Project experience:<br />i. Should have at least 3 projects of similar scope as Operation manager<br />ii. Should have at least 1 project executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization<br />iii. Should have managed a team of at least 20 members<br />iv. Should have a knowledge of ISO 20000, 27001 standards and other relevant standards<br />&nbsp;</p></td><td style=\"height:22.0pt; vertical-align:top; width:225.0pt\"><ul><li>Overseeing the daily operations of the IT department and ensuring that systems and networks are running smoothly.<br />&zwj;Developing and implementing policies, procedures, and processes to</li><li>improve IT operations and increase efficiency and productivity.<br />&zwj;Managing technology vendors and service providers to ensure that the organization&#39;s technology needs are met.</li><li>Evaluating and implementing new technologies and systems that improve IT infrastructure and support the organization&#39;s business goals.</li><li>Lead the team and provide guidance and support to ensure that they are meeting their goals and objectives.</li><li>&zwj;Maintaining a strong understanding of the organization&#39;s business needs and working closely with other departments to ensure that IT is aligned with those needs.</li><li>Ensuring that the organization&#39;s IT policies and procedures are up to date and compliant with industry standards and company regulations.<br />&zwj;Managing the IT budget and ensuring that expenses are in line with the organization&#39;s financial goals</li><li>Keeping up to date with the latest industry trends and developments in IT operations management.</li><li>Assess system performance and recommend improvements</li><li>Provide support and guidance to stakeholders via help desk</li><li>&nbsp;</li></ul></td><td style=\"height:22.0pt; vertical-align:top; width:67.5pt\"><p>3</p></td><td style=\"height:22.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:120.0pt; vertical-align:top; width:106.8pt\"><p><strong>Business Analyst </strong></p></td><td style=\"height:120.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;with preferably MBA degree from a reputed University or College or Institute<br />b) Certifications: Certified Business Analyst<br />c) Experience: Should possess at least 8 years of experience in IT and ICT project implementation in Governance domain<br />d) Project experience: i. Should have at least 2 projects of similar scope as Business Analyst ii. Should have experience of more than 5 years in requirements analysis, business process workflow preparations, domain use case creation and other relevant activities iii. Experienced in designing data warehouses or marts as required<br />&nbsp;</p></td><td style=\"height:120.0pt; vertical-align:top; width:225.0pt\"><ul><li>Initiate the Software Project, brings together the stakeholders, collects all the information, and prepares a Scope Document,</li><li>Focus on high-level details and having the ability to understand precise outcomes as a part of business analyst requirements.</li><li>Understand requirement specifications, process flows, and creating business use case scenarios.</li><li>Represent Project Stakeholders throughout the process definition, functional and business requirements, and service priorities</li><li>Bridge the gap between business requirements and technology solutions and communicate effectively with stakeholders</li></ul></td><td style=\"height:120.0pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:120.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:96.5pt; vertical-align:top; width:106.8pt\"><p><strong>Security Architect </strong></p></td><td style=\"height:96.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Should have OEM/Industry Standard certification like CISM, CISSP, ISO 27001, and others as applicable<br />c) Experience: Should possess at least 8 years of experience in IT and ICT project implementation in Governance domain including designing and maintaining security systems<br />d) Project experience: i. Should have at least 2 projects of similar scope as Security Architect</p></td><td style=\"height:96.5pt; vertical-align:top; width:225.0pt\"><ul><li>Planning, studying and then designing a resistant security architecture for various IT projects.</li><li>Developing prerequisites for networks, firewalls, routers, and other network devices</li><li>Performing vulnerability assessment, security testing, and risk analysis</li><li>Researching and implementing the updated security standards, systems, and best practices</li></ul></td><td style=\"height:96.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:96.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:96.5pt; vertical-align:top; width:106.8pt\"><p><strong>Test Lead</strong></p></td><td style=\"height:96.5pt; vertical-align:top; width:234.95pt\"><p>Have BE / B Tech in computer science/IT (or)</p><p>BCA / B.Sc. Computer Science (or)</p><p>Master&rsquo;s degree in computer science / Computer Application.</p><p>Minimum 5 years of work experience in Testing</p><p>Must have experience in online &amp; offline testing tools, load testing, regression testing &amp; other prominent black &amp; white box testing techniques.</p><p>&nbsp;</p></td><td style=\"height:96.5pt; width:225.0pt\"><ul><li>Meeting with development managers to discuss software specifications and controls.</li><li>Identify the scope of the testing required for a particular release based on the requirements of the document.</li><li>Put out the Test Plan after discussions with the test team and have it reviewed and approved by the Management/ Development team.</li><li>Identify the testing effort required by calculating the sizing needed for the given release and plan the required effort for the same.</li><li>Monitor the test progress by constantly assessing the work assigned to each of the resources and re-balance or re-allocate them as required.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li><li>Bridge any gaps and differences between the Testing team and the Management in order to form a clean two-way interface channel.</li><li>Building, coding, and implementing software evaluation test programs.<br />Running test programs to ensure that testing protocols evaluate the software correctly.</li><li>Finalizing and documenting testing procedures.</li><li>Completing final tests and creating test reports.<br />Presenting test reports to management and suggesting software fixes.</li></ul></td><td style=\"height:96.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:96.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Operation &amp; maintenance (Data Centre) support team</li></ol></li></ol><table border=\"1\" cellspacing=\"0\" style=\"width:683.75pt\"><thead><tr><td style=\"height:17.5pt; vertical-align:top; width:107.75pt\"><p><strong>Position </strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:221.55pt\"><p><strong>Qualification / Experience</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:204.15pt\"><p><strong>Rolls &amp; Responsibilities</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:64.85pt\"><p><strong>Person Months</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:85.45pt\"><p><strong>Home/Field </strong></p></td></tr></thead><tbody><tr><td style=\"height:105.25pt; vertical-align:top; width:107.75pt\"><p><strong>Data Centre Manager</strong></p></td><td style=\"height:105.25pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent or OEM or Industry Standard certification in Infrastructure Management. E.g., ITIL V.3, ISO 20000, and others<br />c) Experience: Should possess at least above 10 years of experience in managing Data Centers<br />d) Project Experience: i. Should have led a team of more than 50 direct/indirect people</p></td><td style=\"height:105.25pt; vertical-align:top; width:204.15pt\"><ul><li>Maintain data centers and environmental facilities including power backup, fire prevention systems, and HVAC</li><li>Planning, installation, and support of the company&rsquo;s physical computer infrastructure (hardware, systems software, networks, and backup systems)</li><li>Troubleshoot issues within the data center and physical infrastructure<br />Manage and support change and release processes for physical environments</li><li>Provide cost and design proposals and liaise with vendors<br />Establish physical operational support procedures for all systems</li><li>Lead the team of employees and contractors, service providers</li><li>Train all team members</li><li>Create metrics and monitoring to aid in SLA reporting</li></ul><p>&nbsp;</p></td><td style=\"height:105.25pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:105.25pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:58.0pt; vertical-align:top; width:107.75pt\"><p><strong>System Administrator</strong></p></td><td style=\"height:58.0pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certification: CCNA / CCNP /MCSE / Linux or any other equivalent<br />c) Experience: Should possess at least 6 to 8 years of experience in system administration domain</p></td><td style=\"height:58.0pt; vertical-align:top; width:204.15pt\"><ul><li>Install and configure software and hardware</li><li>Manage network servers and technology tools</li><li>Set up accounts and workstations</li><li>Monitor performance and maintain systems according to requirements</li><li>Troubleshoot issues and outages</li><li>Ensure security through access controls, backups and firewalls</li><li>Upgrade systems with new releases and models</li><li>Develop expertise to train staff on new technologies</li><li>Build an internal wiki with technical documentation, manuals and IT policies</li></ul><p>&nbsp;</p></td><td style=\"height:58.0pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:58.0pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:94.45pt; vertical-align:top; width:107.75pt\"><p><strong>Database Administrator</strong></p></td><td style=\"height:94.45pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute Certification: OCA/OCP/Java/MySQL or equivalent<br />b) Experience: Should possess at least 6 to 8 years of experience in handling databases / Network databases<br />c) Should have experience in database activities like instance tuning, schema management, space management, backup and recovery, disaster recovery, data replication, database refresh and others.</p></td><td style=\"height:94.45pt; vertical-align:top; width:204.15pt\"><ul><li>Install and maintain the performance of database servers.</li><li>Develop processes for optimizing database security.</li><li>Set and maintain database standards.</li><li>Manage database access.</li><li>Performance tuning of database systems.</li><li>Install, upgrade, and manage database applications.</li><li>Diagnose and troubleshoot database errors.</li><li>Recommend and implement emerging database technologies.</li><li>Create and manage database reports, visualizations, and dashboards.</li><li>Create automation for repeating database tasks.</li><li>Be available for on-call support as needed.</li></ul></td><td style=\"height:94.45pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:94.45pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:62.95pt; vertical-align:top; width:107.75pt\"><p><strong>Network Administrator</strong></p></td><td style=\"height:62.95pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: CCNA/MCSE or any other equivalent<br />c) Experience: Should possess at least 6 to 8 years of experience in Network administration domain experience in handling network infrastructure</p></td><td style=\"height:62.95pt; vertical-align:top; width:204.15pt\"><ul><li>Perform network design and capacity planning.</li><li>Installs and maintains network file servers and network operating systems; ensures that backup copies of all files are routinely made and securely stored at separate location; maintains system documentation.</li><li>Provides second level technical support to users concerning network system operations.</li><li>Diagnoses problems with network equipment and performs equipment repair or upgrades when appropriate.</li><li>Installs, configures, and maintains multi-user software to be accessed from file servers.</li><li>Administer and maintain end user accounts, permissions, and access rights.</li><li>Installs, configures, and maintains network cabling and other networking equipment such as hubs, switches, and UPS.</li><li>Oversee installation, configuration, maintenance, and troubleshooting of network connected end-user hardware, software, and peripheral devices</li><li>Manage security solutions, including firewall, anti-virus, and intrusion detection systems.</li><li>Works in close cooperation with Systems Analyst and Lead Information Technology Technician to facilitate management of computer labs, installing any software needed for each semester and/or special seminars.</li><li>Works with System Administrator and Director of Institutional Services in planning, installation, and documentation of network topology and Virtual Desktop Infrastructure</li></ul></td><td style=\"height:62.95pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:62.95pt; vertical-align:top; width:85.45pt\"><p>Home / Field</p></td></tr><tr><td style=\"height:72.5pt; vertical-align:top; width:107.75pt\"><p><strong>Network Support Engineer 1 </strong></p></td><td style=\"height:72.5pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology from a reputed University or College or Institute</p><p>b) Certifications: MCSE/CCNA certification preferred</p><p>c) Experience: Should possess at least 6 to 8 years of experience as network support engineer</p></td><td style=\"height:72.5pt; vertical-align:top; width:204.15pt\"><ul><li>Providing primary backup for networks should they fail</li><li>Ensuring the effective administration of a new business network</li><li>Performing troubleshooting on all programs when required</li><li>Preparing post-mortem reports and performing trend analysis when there are system failures</li><li>Developing and maintaining all of the comprehensive documentation with the implemented network</li><li>Assisting other departments when it comes to localised issues</li><li>Coordinating with various departments to help develop a network design that runs smoothly</li><li>Managing all the technical network resources for both projects and the business as a whole</li><li>Ensuring there is an optimal level of technical backup at all times</li><li>Monitoring network performance to determine if adjustments need to be made.</li><li>Operating master consoles to monitor the performance of networks and computer systems.</li></ul></td><td style=\"height:72.5pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:72.5pt; vertical-align:top; width:85.45pt\"><p>Field</p></td></tr><tr><td style=\"height:74.65pt; vertical-align:top; width:107.75pt\"><p><strong>Network Support Engineer 2</strong></p></td><td style=\"height:74.65pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Any certification related to networking<br />c) Experience: Should possess at least 3 to 5 years of experience as network support engineer</p><p><br />&nbsp;</p></td><td style=\"height:74.65pt; vertical-align:top; width:204.15pt\"><ul><li>Providing primary backup for networks should they fail</li><li>Ensuring the effective administration of a new business network</li><li>Performing troubleshooting on all programs when required</li><li>Preparing post-mortem reports and performing trend analysis when there are system failures</li><li>Assisting other departments when it comes to localized issues</li><li>Coordinating with various departments to help develop a network design that runs smoothly</li><li>Ensuring there is an optimal level of technical backup at all times</li></ul></td><td style=\"height:74.65pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:74.65pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:100.3pt; vertical-align:top; width:107.75pt\"><p><strong>Technical Support</strong></p></td><td style=\"height:100.3pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology&nbsp;&nbsp; from a reputed University or College or Institute</p><p>b) Certifications: Networking or any other relevant technical certification</p><p>c) Experience: Should possess at least 3 to 5 years of experience in technical support</p><p>&nbsp;</p></td><td style=\"height:100.3pt; vertical-align:top; width:204.15pt\"><ul><li>Collaborating with the IT department on the deployment and maintenance of network technologies.</li><li>Installing, configuring, and updating network software, as well as maintaining hardware and network devices.</li><li>Optimizing server capacity to keep up with demand in online traffic.</li><li>Testing network protocols and ensuring stable and secure server connectivity.</li><li>Training junior IT personnel, providing onsite or remote or technical support, and preparing user manuals.</li><li>Documenting network processes and layouts, as well as enhancing network security.</li></ul></td><td style=\"height:100.3pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:100.3pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Capacity-building program &nbsp;</strong></li></ol><p>System Integrators shall refer to Annexure-V for the Training and Capacity Building that shall give detailed scope on the Training Requirements, Scheduling the Training Calendar, number of trainings and their different types that shall be given along with the proper training aids, for TNUHDB Officials and Other Stakeholders.</p><p>&nbsp;</p><ol><li><strong>Project deliverables / Timeline / Payment schedule</strong></li></ol><table border=\"1\" cellspacing=\"0\" style=\"width:104.82%\"><thead><tr><td style=\"background-color:#e7e6e6; height:21.35pt; width:4.54%\"><p><strong>#</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:64.92%\"><p><strong>Scope Activity / Deliverable of SI</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:16.02%\"><p><strong>Timeline completion</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:14.52%\"><p><strong>Payment Schedule</strong></p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>PLANNING &amp; SOLUTION DESIGN</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>1</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Signing of contract between SI and TNUHDB</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T</p></td><td rowspan=\"2\" style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>2</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Project charter and Work Plan document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 1 month</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>3</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Business Requirement and SRS document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 2 months</p></td><td rowspan=\"3\" style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>4</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of HLD and LLD solution design document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 3 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>5</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Change Management and Capacity Building Plan</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 3 months</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>IMPLEMENTATION </strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>6</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Submission of IT Hardware, Network infrastructure, Support Software procurement plan</p></td><td style=\"height:21.35pt; width:16.02%\"><p>T + 4 months</p></td><td rowspan=\"4\" style=\"height:21.35pt; width:14.52%\"><p>15% of Capex</p></td></tr><tr><td style=\"height:32.05pt; width:4.54%\"><p>7</p></td><td style=\"height:32.05pt; width:64.92%\"><p>Supply, install, configuration, commissioning of required IT infrastructure networking equipment, NoC as part of technical solution, Cloud DC, DR</p></td><td style=\"height:32.05pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:25.1pt; width:4.54%\"><p>8</p></td><td style=\"height:25.1pt; width:64.92%\"><p>Supply, install, configuration, commissioning of required IT infrastructure for end users</p></td><td style=\"height:25.1pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:22.75pt; width:4.54%\"><p>9</p></td><td style=\"height:22.75pt; width:64.92%\"><p>Supply, install, configuration of Support software for Technical wing and end users</p></td><td style=\"height:22.75pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>10</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Digitization and Data Migration</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 7 months</p></td><td style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>11</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Application Development / Customisation of solution</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td><td rowspan=\"6\" style=\"height:13.45pt; width:14.52%\"><p>20% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>12</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Application Cloud hosting in DC and DR</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>13</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Integration Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>14</p></td><td style=\"height:13.45pt; width:64.92%\"><p>System Integration Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>15</p></td><td style=\"height:13.45pt; width:64.92%\"><p>User Acceptance Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>16</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Test reports</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>17</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Project Documentation, User Manuals, SoPs</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td><td rowspan=\"2\" style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>18</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Training, Capacity Building, Change Management</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 10 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>19</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Pilot implementation of PMS, ERP, Portal applications</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 11 months</p></td><td rowspan=\"2\" style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>20</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Submission of &quot;Lessons Learnt&quot; and Solution Update based on Pilot Implementation (Including UAT and Certification)</p></td><td style=\"height:21.35pt; width:16.02%\"><p>T + 11 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>21</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Third party security audit and certification</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 12 months</p></td><td style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>22</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Go-Live</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 12 months</p></td><td style=\"height:13.45pt; width:14.52%\"><p>15% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>23</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Solution stabilisation &amp; Handholding to TNUHDB</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 14 months</p></td><td style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>10% of Capex</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>OPERATION &amp; MAINTENANCE</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:45.1pt; width:4.54%\"><p>24</p></td><td style=\"height:45.1pt; width:64.92%\"><p>Quarterly Operation and Maintenance Support + Quarterly SLA Compliance Report</p></td><td style=\"height:45.1pt; width:16.02%\"><p>Every quarter for O&amp;M period</p></td><td style=\"height:45.1pt; vertical-align:bottom; width:14.52%\"><p>~8.31% of OPEX per Quarterly (OPEX equally amortized across 12 quarters, time of 3 years)</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>PROJECT HANDOVER &amp; EXIT</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>25</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Handing over of maintenance, user training and knowledge transfer</p></td><td style=\"height:21.35pt; width:16.02%\"><p>&nbsp;36th month of O&amp;M period</p></td><td style=\"height:21.35pt; vertical-align:bottom; width:14.52%\"><p>10% of Capex</p></td></tr></thead></table><p>&nbsp;</p><p>Note: Capex (Capital Expenditure) and Opex (Operational Expenditure) to be quoted by the firm (System Integrator)</p><ol><li><strong>Compliance to Standards</strong><ol><li>Adherence to Open-Source Standard</li></ol></li></ol><p>The solution for this project must be designed following open standards, to the extent feasible and in line with overall system requirements set out in this RFP, to provide for good inter-operability with multiple platforms and avoid any technology or technology provider lock-in.</p><ol><li><ol><li>Compliance with Government standards &amp; policies</li></ol></li></ol><p>The solution proposed by SI in response to this RFP, must comply with all the relevant standards and policies related to e-Governance application development published by Government of India, which includes:</p><ol><li>Ministry of Electronics and Information Technology, Government of India as updated from time to time. The latest version of the standards may be found at https://egovstandards.gov.in</li><li>National Informatics Corporation The latest version of the standards may be found at https://web.guidelines.gov.in&nbsp;</li><li>Guidelines for Indian Government Websites (GIGW), available at: http://darpg.gov.in/sites/default/files/Guidelines_for_Government_websites_0_0.pdf</li><li>&ldquo;Policy on Open Application Programming Interfaces (APIs) for Government of India&rdquo; available at: http://www.egazette.nic.in/WriteReadData/2015/164238.pdf</li><li>&ldquo;Policy on Adoption of Open-Source Software for Government of India&rdquo; available at URL http://www.egazette.nic.in/WriteReadData/2015/163746.pdf</li><li>Information Technology Act 2000 (revised 2008) (http://www.meity.gov.in/content/information-technology-act)</li><li>CERT-In security guidelines for Indian Government websites (http://www.cert-in.org.in/)</li><li>E-SAFE Guidelines for Information Security (http://egovstandards.gov.in/&nbsp; )</li><li>e-Governance Standards for Preservation Information Documentation of e-Records (http://egovstandards.gov.in/&nbsp; )</li><li>e-Governance standards on Biometric standards (http://egovstandards.gov.in/&nbsp; )</li><li>Framework and Guidelines for Use of Social Media for Government Organizations (http://meity.gov.in/writereaddata/files/Approved%20Social%20Media%20Framework%20and%20Guidelines%20_2_.pdf)</li><li>Guidelines for Indian Government Websites (http://egovstandards.gov.in/ )</li><li>InDEA (India Digital Ecosystem Architecture (https://www.meity.gov.in/india-enterpise-architecture-indea )</li><li>Digital Personal Data Protection (https://www.meity.gov.in)<ol><li>Compliance with Industry Standards</li></ol></li></ol><p>In addition to above, the proposed solution must be based on and compliant with industry standards (their latest versions as on date) wherever applicable. This will apply to all the aspects of solution including but not limited to design, development, security, installation, and testing. There are many standards that are summarized below. However, the list below is for reference purposes only and is not to be considered as exhaustive.</p><ol><li>Portal development W3C specifications</li><li>Information access/transfer protocols SOAP, HTTP/HTTPS</li><li>Photograph JPEG (minimum resolution of 640 x 480 pixels)</li><li>Scanned documents TIFF (Resolution of 600 X 600 dpi)</li><li>Biometric framework BioAPI 2.0 (ISO/IEC 19784-1:2005)</li><li>Latest HTML standards<ol><li>Single-Sign On</li></ol></li></ol><p>The proposed solution should enable single-sign-on so that any user once authenticated and authorized by system is not required to be re-authorized for completing any of the services in the same session. For employees of the TNUHDB concerned, the browser-based application accessed on the intranet, through single-sign-on mechanism, will provide access to all the services of the departments concerned (based on their roles and responsibilities), Help module, basic and advanced reporting etc. Similarly, for external users (citizens and others), based on their profile and registration, the system shall enable single sign on facility to apply for various services, integration with existing TNUHDB applications, external applications, submit queries /complaints and check status of their applications.</p><ol><li><ol><li>Support for PKI based Authentication and Authorization</li></ol></li></ol><p>The solution shall support PKI based Authentication and Authorization, in accordance with IT Act 2000, using the Digital Certificates issued by the Certifying Authorities (CA) such as MTNL or NIC or Maharashtra Government authorized agency. Two factor authentications (login id &amp; password and digital signature) shall be implemented by the SI for officials/employees involved in processing citizen services as per the Functional requirement specification of the services specified in RFP.</p><ol><li><ol><li>Interoperability Standards</li></ol></li></ol><p>Keeping in view the evolving needs of interoperability, especially the possibility that the solution shall become the focal point of delivery of services and may also involve cross functionality with the e-Government projects of other departments / businesses in future, the solution should be built on Open Standards. Some of the states already have other applications deployed and running for delivering services to citizens. The SI shall ensure that the application developed is easily integrated with the existing applications. Every care shall be taken to ensure that the code does not build a dependency on any proprietary software, particularly, using proprietary &lsquo;stored procedures&rsquo; belonging to a specific database product.</p><ol><li><ol><li>Scalability</li></ol></li></ol><p>One of the fundamental requirements of the proposed application is its scalability. The architecture should be proven to be scalable (cater to increasing load of internal and external users and their transactions) and capable of delivering high performance for at least four years from the date of deployment. In this context, it is required that the application and deployment architecture should provide for Scale-Up and Scale out on the Application and Web Servers, Database Servers, and all other solution components.</p><ol><li><ol><li>Security</li></ol></li></ol><p>The systems implemented for project should be highly secure, considering that it is intended to handle sensitive data relating to the TNUHDB departments, and others. The overarching security considerations are described below.</p><ol><li>The security services used to protect the solution shall include Identification, Authentication, Access Control, Administration and Audit and support for industry standard protocols.</li><li>The solution shall support advanced user authentication mechanisms including digital certificates and biometric authentication (wherever it is required like at Data Centre).</li><li>Security design should provide for a well-designed identity management system, security of physical and digital assets, data and network security, backup and recovery and disaster recovery system.</li><li>The solution should provide for maintaining an audit trail of all the transactions and should also ensure the non-repudiation of audit trail without impacting the overall performance of the system.</li><li>The overarching requirement is the need to comply with ISO 27001 standards of security.</li><li>The application design and development should comply with Open Web Application Security Project [OWASP] top 10 principles.</li></ol><p>An indicative list of information security requirements which are to be followed by SI is specified below. During the SRS preparation phase, this may be modified in concurrence with TNUHDB.</p><p><em>Indicative list of information security requirements</em></p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:22.25pt\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; width:130.5pt\"><p><strong>Security Areas</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:314.75pt\"><p><strong>Specifications</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Physical Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>DC, Experience Centre, other assigned to SI should be physically secured by the SI.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Network Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Appropriate firewalls, IPS, SSL devices etc. should be used to ensure Network security</li><li>The solution should support SSL encryption mechanism for transferring data across network and between client and server</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>System Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Adequate access control procedures should be defined to secure the entire IT system, physically and logically.</li><li>The access controls procedures should cover all stages in the life cycle of user access, from the initial registration of new users to the final deregistration of users who no longer require access to information systems and services.</li><li>The system should have two factor authentication mechanism either through One Time Password (OTP) or soft tokens-based technologies for access control and user authentication.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Application Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The solution should have appropriate authentication mechanisms</li><li>Application user authentication &amp; authorization related transactions should be encrypted.</li><li>Operating system should be hardened on which the application is installed.</li><li>A web application firewall shall be deployed to secure the web-layer.</li><li>The web applications should be free from OWASP / SANS and CERT-IN web application vulnerabilities as released from time to time.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Audit Trails &amp; Logs</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Event logging should create an accurate record of user activity such as which users accessed which system, and for how long.</li><li>The solution should log all types of events especially those related to security</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Data Protection</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The solution should support SSL encryption mechanism for transferring data across network. Provision should be made to ensure that data in any form should not be copied on to any external media without authorization.</li><li>The data transferred across network should be encrypted using Public Key (PKI) Infrastructure.</li><li>Complete end point data protection should be provided at client site such that any type of data pilferage using unauthorized copying, storing, and emailing could be prohibited.</li><li>Access to all system resources including data files, devices, processes, and audit files should be provided to the intended users only.</li><li>All mobile applications should be designed and developed in a way that it ensures security of the application and data on the device.</li><li>Ensure to protect documents by assigning security parameters and criteria to provide more effective protection for an electronic document to maintain Confidentiality, Authorization, Accountability, Integrity, Authenticity and Non-repudiation.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Session Management</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>The system should limit to only one session per user or process ID.</li><li>The system should put a limit on the maximum time length of an idle session, which should ensure that automatic session termination takes place after expiry of the specific time length.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Data Warehouse Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Users must not have access to the data warehouse prompt of the application. Access to the data warehouse prompt must be restricted only to the database administrator.</li><li>&ldquo;Super user&rdquo; rights for the data warehouse must only be given to the administrator and the activities of these accounts must be properly logged.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Application Deployment</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>All unused ports should be blocked at server machines.</li><li>The application server should be segregated from internet zone through firewall or other filtering mechanism.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Information Security Governance</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The employees working on the project should be made aware of his or her responsibilities with respect to Information Privacy and Information Security.</li><li>Employees working on the project shall undergo security awareness training during induction.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Storage Equipment</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>All information storage media (e.g., hard disks, magnetic tapes and others) should be physically secured.</li><li>Physical access to magnetic tape, disk, and others should be restricted to authorized personnel.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Computing Environment</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>All workstation hardware and associated peripheral equipment at Client site premises should be marked with a unique asset identification code. The asset identification code should follow a defined naming convention that would uniquely and appropriately identify the asset.</li><li>USB ports should be disabled on specified desktops / laptops at Client site premises, to prevent use of pen drives, external disk drives etc.</li><li>IT assets inventory must contain criticality of hardware in levels of importance (Confidentiality, Integrity and Availability).</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Email Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Email must have protection from inbound and outbound email threats. It should report compliance violations by scanning all inbound and outbound email content and attachments for sensitive data, real-time protection from spam, phishing, viruses, spoofing, zombies, directory harvest (DHA), Denial of Service (DoS) and other attacks.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Virus Control</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Latest version of anti-virus should be installed on workstations and servers at Client premises.</li><li>The anti-virus software should run on network file servers on a regular basis (preferably daily).</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Compliance to Security Standards</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Software/Hardware system should comply with &lt;ISO/IEC 27001:2015&gt;.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Security Information and Event Management System (SIEM)</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>SI should install SIEM for Real-time analysis of security alerts generated by applications and infrastructure.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Database Activity Monitoring (DAM) Solution</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>SI should install DAM to monitor all database activities and internal users with privileged access.</li></ul></td></tr></tbody></table><p>&nbsp;</p><ol><li><ol><li>Application Architecture</li></ol></li><li>It has been proposed that the applications designed and developed for the departments concerned must follow some best practice and industry standards. To achieve the high level of stability and robustness of the application, the system development life cycle must be carried out using the industry standard best practices and adopting the security constraints for access and control rights. The various modules / application should have a common Exception Manager to handle any kind of exception arising due to internal/external factors.</li><li>Similarly, the modules of the application are to be supported by the Session and Transaction Manager for the completeness of the request and response of the client request. The system should have a module exclusively to record the activities/ create the log of activities happening within the system / application to avoid any kind of irregularities within the system by any User / Application.<ol><li>Proposed Application Architecture</li></ol></li></ol><p>An indicative 3-tier architecture (also referred to as multi-tier or N-tier architecture) has been proposed for the Application Solution.</p><p>The entire processing should take place in n-tier architecture:</p><ol><li>Front-end software (client tier) - responsible for the presentation of information and provides user interface.</li><li>Business Process / Service Layer &ndash; In the long SSDG may be used, as an Integrated Framework for delivery of Services.</li><li>Application Layer &ndash; The Business logic for all the application as per the FRS document</li><li>Database Layer - responsible for the manipulation and storage of data.</li></ol><p>&nbsp;</p><ol><li><ol><li>High Level Design (HLD)</li></ol></li></ol><p>Once the SRS are approved, the SI shall complete the High-Level Designing and all HLD documents of all the functionalities, integration with existing application and external application. The SI shall prepare the HLD and have it reviewed and approved by the TNUHDB will sign off on the HLD documents based on the advice of PMC.</p><ol><li><ol><li>Detailed (Low Level) Design (LLD)</li></ol></li></ol><p>The LLD shall interpret the approved HLD to help application development and shall include detailed service descriptions and specifications, application logic (including &ldquo;pseudo code&rdquo;) and UI design (screen design and navigation). The preparation of test cases will also be completed during this stage. The SI shall have the design documents reviewed and approved by the TNUHDB. TNUHDB will sign off on the LLD documents based on the advice of PMC.</p><ol><li><ol><li>Test Plan</li></ol></li></ol><p>Once the SRS is approved and design is started, the SI shall prepare all necessary Test Plans (including test cases), i.e., plans for Acceptance Testing. Test cases for Initial and Final User Acceptance Testing shall be developed in collaboration with domain experts identified at TNUHDB. Initial and Final User Acceptance Testing shall involve Test Case development, Unit Testing, Integration and System Testing, Functional testing of Application, Performance testing of the Application including measurement of all Service Levels as mentioned in this RFP and finally SI shall also carryout Load/ Stress testing. The SI will submit the test plans and test result reports to TNUHDB for comprehensive verification and approval.</p><ol><li><ol><li>Specification</li></ol></li><li>Fingerprint scanning IAFIS specifications</li><li>Digital signature RSA standards</li><li>Document encryption PKCS specifications</li><li>Information Security to be ISO 27001 compliant</li><li>Operational integrity &amp; security management to be ISO 17799 compliant</li><li>IT Infrastructure management ITIL / EITM specifications</li><li>Service Management ISO 20000 specifications</li><li>Project Documentation IEEE/ISO specifications for documentation</li><li>Workflow design WFMC Standards</li><li>Information access/transfer protocols W3C Specifications</li><li>Portal Development - W3C, GIGW</li><li>Software Development - CMMI Level 3 and above</li><li>Interoperability - Web Services, Open Standards</li><li>Document encryption - PKCS specifications</li><li>Information Security - ISO 27001 certification (or above) *</li><li>IT Infrastructure management - EITM specifications</li><li>Service Management - ISO 20000 specifications (or above)</li><li>Project Documentation - IEEE/ISO specifications for documentation</li><li>Records Management - ISO 15489 certification (or above) *</li></ol><p>* The SI shall get the entire facility (Record Management Facility) certified with respect to the above specification. The cost for the same will be borne by the SI. These are mandatory requirements. The ISO 15489 certification for Records Management shall be obtained on &ldquo;Acceptance&rdquo;, ISO 9001 certification within 3 Months of &ldquo;Acceptance&rdquo;, &ldquo;CMMI Level 3 or above&rdquo; within 6 months of &ldquo;Acceptance&rdquo; and ISO 27001 Certification within 6 Months of &ldquo;Acceptance&rdquo;. Any delay in the timelines mentioned above, payments to the SI shall not be made.</p><ol><li><ol><li>Non-Functional Requirements</li></ol></li></ol><p>The non-functional requirements for this project which are to be delivered by the SI are provided in table mentioned below.</p><ol><li><ol><li><ol><li>General system</li></ol></li></ol></li><li>The System will have to compliance the specifications mentioned in this RFP and with GoI guidelines under &ldquo;standards of e-governance application/ e-Gov. standards&rdquo; (available at http://egovstandards.gov.in/)</li><li>The solution must comply with MEITY&rsquo;s security guidelines, compliances, regulations, and other guidelines as well as policies. The technical solution of Digitalization project must be in conformance with e-Governance Standards of MEITY. The entire solution must be capable of incorporating any changes because of changes in the regulations and policies of the government from time to time.</li><li>The services rendered by TNUHDB must comply with The Tamil Nadu Information Technology (Electronic Service Delivery) Rules, 2016.</li><li>System should allow the users to deploy the application on various environments</li><li>The system will be scalable enough to accommodate a large population of users. The number of TNUHDB users are envisaged to be nearly 1000 at TNUHDB and 4100 external users. The concurrent users will be nearly 1000.</li><li>The System will be designed and developed to support a 16/7 production environment and reporting system</li><li>The system should be developed on the principles of SOA</li><li>Should be compatible with the latest versions of all browsers like IE, Microsoft Edge, chrome, Firefox, Mozilla etc.</li><li>The external portal development should adhere to GIGW (Government of India guidelines for website)</li><li>It should be interoperable with other web applications and for this the system must be following W3C and REST based web services standards on &ldquo;web-design and application</li><li>The system must be flexible enough to accommodate other languages in near future as may be demanded by TNUHDB</li><li>The solution should be provided along with the product manuals, user manuals and functional specifications.</li><li>The solution should maintain a database of frequently asked questions (FAQ).</li><li>The process for removing unnecessary code from the application after it is released should be documented.</li><li>Application code should not contain invalid references to network resources (Pathnames, URLs etc.).</li><li>Single Sign On facilities to be provided for all Digitalization solution applications</li><li>The full application should be able to support clustering, load balancing, high availability, and failover mechanism both vertically and horizontally</li><li>Availability of Integration layer as an independent service component is available for SOA based integration with different TNUHDB and external systems.</li><li>Capable of business process-based orchestration</li><li>Supports integration with SMTP for email integration for sending real time emails linked to business processes</li><li>Supports integration with the SMS gateway (Short Messaging Service) to send SMSs</li><li>Provide audit trails, auditing of user actions and document history</li><li>The System will inform the user of errors based on the validations performed</li><li>The System will allow the user to review and update information if there are correctable errors</li><li>The System will contain a &quot;help&quot; function on each screen as needed to provide users with instructions on how to perform functions, descriptions of data elements and/or other information</li><li>The System will have role-based access control at the data field level</li><li>The System will have a user interface written in Tamil (Unicode font), English (including warnings, notifications and user prompts) free of grammatical errors and typos</li><li>The System will authenticate users before allowing access to functionality requiring a login<ol><li><ol><li>Interoperability &ndash; Integration</li></ol></li></ol></li></ol><ol><li>SI shall be responsible for all integration and associated testing/quality assurance of all Products, including but not limited to -<ol><li>Data / API / Connectivity / Database integration and testing.&nbsp;</li></ol></li></ol><ol><li><ol><li>Hardware / software configuration, installation, integration, and testing.</li><li>Uptime testing and diagnostics.</li></ol></li><li>The System&#39;s interfaces will secure and protect the data and the associated infrastructure from a confidentiality, integrity, and availability perspective.</li><li>The System&#39;s interface infrastructure shall continue to operate despite failure or unavailability of individual technology components such as a server platform or network connection.</li><li>The System&#39;s interfaces must be scalable to accommodate changes in scale including changes in user population, transaction volume and throughput. The System will be capable of making any changes to the interface data elements/layouts easily, and to test those changes.</li><li>The System will implement, at a minimum, interfaces (both real-time and batch) with the systems requiring integration and data sources using APIs</li><li>The System will provide the capability to perform source to destination file integrity checks for exchange of data and alert appropriate parties with issues</li><li>Systems components will be committed to an advanced approach to interoperability using web services and Service Oriented Architecture (SOA)</li><li>Systems will provide the ability to publish services and related data to be used by different types and classes of external and internal systems.</li><li>Systems will provide the capabilities for a Real-Time (or near real-time) Integrated systems where data is easily shared across systems with appropriate adherence to security and privacy restrictions.</li><li>Message and data formats should be based on logical representations of business objects rather than native application data structures</li><li>The solution should support delayed message delivery in case of transmission failure. It shall support putting failed messages in redelivery queue for retransmission<ol><li><ol><li>Work-flow Management</li></ol></li></ol></li></ol><ol><li>System should support easy workflow configuration, its maintenance, and need based modification, addition alteration of the steps</li><li>System should offer performance monitoring features for the business processes. The system shall be capable of identifying, reporting inefficient processes and operations and/or those with high level of error and omission</li><li>The solution should have the ability to support automated workflow designed to address needs of business users</li><li>System should provide option to define KPI (Key Process Indicators) on processes and enable dashboard and drilldown reports on KPI.<ol><li><ol><li>Security</li></ol></li></ol></li></ol><ol><li>The SI should prepare information security policy and supporting procedures for ISO 27000:2016 certifications. The policy and procedure should be submitted prior to Go-Live.</li><li>The TNUHDB Digitalization systems must be in compliant with Information security standards and guidelines for e-Governance in India.</li><li>SI should develop a privacy policy to be posted on the web portal. Privacy policy should be in line with the government of India&rsquo;s policy on information security.</li><li>The system should be capable incorporating validation checks into applications to detect any corruption of information through processing errors or deliberate acts.</li><li>The system should validate the data output from an application to ensure that the processing of stored information is correct and appropriate to the circumstances</li><li>The system should implement secure error handling practices in the application<ol><li><ol><li>Use administration and authentication</li></ol></li></ol></li></ol><ol><li>The system must administer the various users, their rights and must provide for authorization of users</li><li>Authentication should be done centrally and in should be in consonance with the user base. It should provide for user with username and passwords</li><li>The system must provide for password reset procedure, compulsory password reset after 90 days, ability to configure the number of permissible log-in attempts, ability to provide automatic time out (log out) for user,</li><li>System should allow the users to archive details of registered users</li><li>System should allow the users to assign / integrate digital signatures to all registered users</li><li>It should provide logging by user and terminal, the date and time of all transactions with details of creation, reading, updating, deletion or printing.</li><li>Notify security administrator of unauthorized access or attempted access and record in a log with reporting.</li><li>The mobile application must be compatible with iOS and Android systems</li><li>It must support the entering of data on a real time basis</li><li>The system should support configuration setting for all types of mobile phones, smart phones, tablets etc.</li><li>It must support firewall and antivirus capability on mobile apps</li><li>The application must provide for administrative approval for updating and configuring mobile devices</li><li>The SI must ensure the secure configuration, data synchronization and sharing capabilities for mobile devices with authentication and authorization policy enforcement on document manipulation and application access.<ol><li><ol><li>General Conditions</li></ol></li></ol></li></ol><p>The framework and data structure developed shall be in compliance with the Reference Standard for Document and Cyber security launched by Government of Tamil Nadu</p><ol><li><strong>Data, local services, personnel, and facilities to be provided by the Borrower &nbsp;</strong></li></ol><p>For the effective implementation of the proposed solution, TNUHDB will provide following support and facilities to the System Integrator (SI):</p><ul><li>Provide support in reviewing the deliverables submitted by SI during the design and development stages of the project and provide necessary input and approval.</li><li>Provide required coordination support for deployment of the solution for TNUHDB users, offices, and stakeholders</li><li>Provide necessary physical documents, files, records for digitisation as per the scope of work for SI</li><li>Provide data formats of registers maintained in TNUHDB, application forms processed for services, management information reports required to enable design and development of digital solution as per requirement</li><li>Provide identified space / room for establishment of Network Operating Centre (NOC) in TNUHDB board office to house network and security equipment for enterprise resources like Network, Applications, Hardware, and Connectivity to be monitored</li><li>Provide identified space / room to Helpdesk support team to monitor and support the citizen.</li><li>Provide workspace for the SI team to deploy their personnel to work from TNUHDB office during implementation and Operation maintenance.</li><li>Provide identified space / room to PMC team to monitor and support the implementation of Digitisation of TNUHDB.</li><li>Provide support to all the above specified teams, by facilitating necessary civil works and office furniture across all TNUHDB offices. [Deloitte1]&nbsp;</li></ul><ol><li><strong>Operation and maintenance</strong></li></ol><p>SI shall operate and maintain all the components of this project after the commencement of the go-live date. During the O&amp;M phase, SI shall ensure that the service levels are monitored on a regular basis, where they meet the SLA criteria, and shall be reported to TNUHDB.</p><p>Post Go-Live, if any system/sub-system/appliance deployed during the O&amp;M phase then these components must be added in the <strong>TNUHDB systems only after proper induction procedures are followed including hardening and security testing.</strong></p><p>SI will ensure that at no time shall any data of TNUHDB Systems be ported outside the geographical limits of the country. O &amp; M is detailed in Annexure VI.</p><ol><li><strong>Institutional and organization arrangements.</strong><ol><li>Project Stakeholders</li></ol></li></ol><p>For the successful implementation of this project, it is important to have a clear understanding and execution of the roles and responsibilities of the three key stakeholders:&nbsp;</p><ul><li>TNUHDB&nbsp;</li><li>Consulting Firm (M/s Deloitte Touche Tohmatsu India LLP)&nbsp;</li></ul><ul><li>System Integrator (SI)/Vendor&nbsp;</li></ul><p><strong>TNUHDB: </strong>TNUHDB shall provide the overall guidance, project monitoring and coordination between various stakeholders for execution of the project. It shall also seek the necessary approvals as required from the concerned officials and Board.&nbsp;</p><p><strong>Consulting Firm (Deloitte):</strong> Deloitte shall prepare the digital strategy roadmap for TNHUDB, assist in preparing RfP, assist in bid management for the selection of the SI/vendor for the identified solutions in the roadmap and provide handhold support during the initial period after onboarding of the SI/vendor.&nbsp;</p><p><strong>SI/Vendor</strong>: The SI/Vendor shall be selected by TNUHDB who shall then carry out the implementation of solutions proposed as per the terms and conditions laid out in the RfP.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Project Governance Structure</li></ol></li></ol><p>A clear definition of the roles and responsibilities of all the stakeholders in a project establishes transparency, accountability, manageability, and efficiency of the project. The governance structure that facilitates the coordination and implementation of project activities and fosters interactions among the team members with a minimum number of disruptions, overlaps and conflict.</p><p>&nbsp;</p><p>Three-tier project management structure:</p><ul><li>Project Leadership Team (office of TNUHDB)</li><li>Project Implementation Committee (PIC) with PIC members and Project Coordination Team</li><li>Project Management Consultant (PMC)</li><li>Implementation Agency (System Integrator / Vendor)</li></ul><p><br />Governance Structure and Responsibility is detailed in Annexure VII</p><p>&nbsp;</p><ol><li><ol><li>Communication Protocols&nbsp;</li></ol></li></ol><p>To ensure timely completion of project activities the following modes for communications are proposed medium, submission of work outputs as mentioned into the following sub-sections.&nbsp;</p><p>Review Meetings&nbsp;</p><p>The review meetings would be the primary and most frequent mode of communication.&nbsp;</p><ul><li>These would be held at periodic intervals&nbsp;</li><li>These would be utilized to take stock of the progress made and discuss the roadblocks being faced.&nbsp;</li><li>Such meetings would normally be attended by representatives from SI and TNUHDB team.&nbsp;</li><li>Among other things progress review in line with the project schedule, progress on the previous meeting output, identification of newly evolved risks and finalization of actionable items as an outcome of the meeting would be discussed.&nbsp;</li></ul><p>&nbsp;</p><p>Suitable online mediums for meeting shall be leveraged wherever required to organise and conduct virtual meetings to facilitate effective and efficient way communications.&nbsp;</p><p>Also, to ensure that there is a two-way communication, all the minutes of the meeting will be recorded and shared with client within 5 working days of the meeting. Such minutes of meeting should be accepted in whole or with changes</p><p>&nbsp;</p><ol><li><ol><li>Progress Reports/ Reports/Notes&nbsp;</li></ol></li></ol><p>Periodic project status report would be submitted by SI highlighting the status of all activities undertaken and the issues requiring attention. The periodic progress reports shall be submitted as per the project plan&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Communication medium</li></ol></li></ol><p>Email - To facilitate fast action on technical aspects, quick decision making and resolution of issues, both the consultants and client would make extensive use of emails exchanges. Communications will also be marked to the representative of TNUHDB.&nbsp;</p><p>Other virtual medium &ndash; Virtual meeting rooms on various online platforms like MS teams/Zoom/ others shall also be used for holding any meeting, discussion which are not possible to conduct in person.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Submission of Work Outputs&nbsp;</li></ol></li></ol><p>SI shall submit its work outputs, recordings of minutes, requests for documentation in English language only through the SI mail id. Any communication from non-SI mail id related to project work outputs should not be considered as formal communication from SI.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Quality Assurance Plan</li></ol></li></ol><p>SI would deploy its tailormade quality assurance and management process in consultation with TNUHDB officials and associated stakeholders through implementing and managing a series of quality practices over the lifecycle of the assignment. SI shall ensure that the assessment and deliverable meet the suitable quality standards.</p><p>&nbsp;</p><ol><li><ol><li>Change management and risk management&nbsp;</li></ol></li></ol><p>Change Management&nbsp;</p><p>Any change, which may result in enhancement to geographical, functional or technical scope of work, postponement of the major milestones in the engagement plan, increase in resources, infrastructure or planned training sessions will be subject to the following process:</p><ul><li>Either TNUHDB or SI can raise a scope change request (&ldquo;SCR&rdquo;) accompanied by suitable supporting documents.&nbsp;&nbsp;</li><li>SI team will prepare an estimate of person month effort to be required together with an estimate of additional fees and likely impact on the resource plan for each SCR.</li><li>Consequent to formal approval by TNUHDB for the SCR together with cost and time estimates, the SI will then commence any work arising out of the SCR(s).&nbsp;&nbsp;</li></ul><p>Risk Management&nbsp;</p><p>Risks may arise or may be identified at any point through the engagement, and will be documented through a risk management log and be subject to the following process:&nbsp;</p><ul><li>SI identifies a relevant project risk accompanied by suitable supporting rationale. SI team will document the risk, probability, impact, and proposed mitigation actions.&nbsp;</li><li>Approval of the proposed mitigation plan/ actions will be required from the core committee.&nbsp;</li></ul><p>&nbsp;</p><ol><li><strong>Commencement Date</strong></li></ol><p>Probable date of Commencement of contract: 01.01.2024</p><ol><li><strong>Period of Contract</strong></li></ol><ul><li>12 months for project completion and Go-Live</li><li>2 Months for Solution stabilization from Go-Live, Handholding support to TNUHDB</li><li>Operation and Maintenance: 36 months from Go-Live</li></ul><ol><li><strong>Reporting arrangement</strong></li></ol><ul><li>Team Leader / Program Manager of System Integrator (SI) shall report to the Project Director/ Joint Managing Director, TNUHDB or his / authorized nominated officer</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure I &nbsp;- Solution / Implementation Approach</strong></p><p><strong>Solution / Implementation Approach</strong></p><p>Implementation of ERP, and digital solution for TNUHDB be planned seamlessly in a manner for effective deployment[Deloitte2]&nbsp;, cost effectiveness and ease of administration. The identified scope of work are listed below. The detailed scope of work and functional requirements for Essentials and Add On are provided in the Annexure II, Annexure III, Annexure IV in this ToR document.</p><ul><li>Essentials &ndash; Implementation and O&amp;M for 3 years<ul><li>Project Management System</li><li>Enterprise Resource Planning (ERP) System</li><li>Upgradation of Citizen Web Portal</li><li>TNUHDB Employee Portal</li><li>Enterprise Support Applications</li><li>Citizen Mobile Application</li><li>Support software (Design &amp; Planning)</li><li>Data Digitalization</li><li>IT Infrastructure (Server and Firewall for LAN)</li><li>IT and End User Infrastructure</li><li>(Desktop, Laptop, Peripherals)</li><li>Networking (wireless) (Board office)</li><li>Project Management Consultants</li><li>Cloud Hosting</li><li>Connectivity (Internet Charges)</li><li>Training</li><li>Helpdesk Support</li><li>Smart Module</li><li>Experience centre &amp; Citizen Kiosk</li></ul></li><li>Add On and O&amp;M for 3 years<ul><li>Networking (wireless for Divisions)</li></ul></li></ul><p>&nbsp;</p><p>&nbsp;</p><p>Solution approach taken considers implementation of essentials solution required for TNUHDB across all offices and users with 3-year operation and maintenance, followed by the implementation of additional components of networking (wireless for Divisions) with 3 year operation and maintenance.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure II- Track 1: Application design, development, and implementation</strong></p><ol><li><ol><li><ol><li>Scope of Application Development</li></ol></li></ol></li></ol><p>The scope of work will comprise development of Project Management System, ERP System, Citizen &amp; Employee Portal, Grievance Redressal Management, Document Management System, content management system, business intelligence and analytics platform &amp; MIS Dashboard and others as detailed below.</p><p>The application may be developed at SI&rsquo;s premises. However, the identified key personnel need to be based at TNUHDB&rsquo;s office/other designated locations during entire project duration. Development shall include Prepare Development Framework, Develop System Databases, Conduct Detailed Design, Establish Operations Functions, Complete Migration Design, Code Test Development Components. Before the actual development work starts, the SI must design the integrated solution architecture.</p><p><strong>Functional requirements of the proposed applications:</strong></p><p>This section provides the functional requirements of the overall Digitization solution. All the functional description provided in this section are minimum requirement and have been provided for immediate reference only.</p><p>The intended coverage of the functional specifications includes the following modules:</p><ol><li>Integrated Project Management System</li><li>ERP System for Administration, Finance &amp; Accounting, HRMS and Estate Management</li><li>TNUHDB Citizen Web Portal</li><li>Employee Portal with Task Dashboard, Knowledge Management System and MIS Dashboard</li><li>Helpdesk System</li></ol><p>High level functionalities of the proposed modules are listed in following section.</p><p><strong>Project Management System</strong></p><p>Proposed Project management System should have the following features.</p><ul><li>Project management system should be developed based on the need of technical wing.</li><li>It is expected to understand the process of various sections and functions operating under technical wing and automate the manual process for minimum manual interventions</li><li>It should leverage the communication between peer working group such as CRZ, Forest Clearance, Environment Clearance so as to prepare suitable Layout &amp; design for better outcomes of land identification and Digitization. Also, it should help in managing project documentation such as DPR, design drawings, test reports and invoices etc.</li><li>It should assist in preparation, capturing of estimation of quantities, technical specification, Bill of Material</li><li>It should assist in capturing of Structural design requirements, development, Soil Test Report (STR), Foundation and load bearing analysis.</li><li>It should enable Architectural Design Planning activities, preparation of type design, layout drawings, charting out of required planning permissions, clearances and NoC&rsquo;s from statutory and regulatory authorities, compliance to Rules and Frameworks required to be adopted for scheme development, building permissions, Urban Land Ceiling and Entre-upon-Permission details to be mapped with the Survey Sketches under e-Land Management Provision</li><li>It should assist technical and finance team in monitoring CAPEX and OPEX of project, deviations observed from the approved budget, agreed terms of the project contract and reporting to concerned</li><li>Modules built on common platform enabling access and synchronization on all devices through web application and mobile application</li><li>Mapping of advance technologies and techniques for evidence/data acquisition for</li><li>Geo tagging all progress inputs through mobile GIS architecture</li><li>Real time data inputs and real time dashboards for Executives, Project managers and Field Managers, also enables two-way data flow</li><li>Use of visualization tools and evidence to effectively represent the progress, challenges and analytics; enable faster decision making</li><li>It should be customizable to suite varied project types and scenarios</li><li>It should be integrated to various inhouse platforms to have easy access to all documents and guidelines related to project or portfolio</li><li>Integration with digital form of e-MBook (Measurement book), enabling detailed and abstract entries based on physical progress of the project, declaration, verification, and approval of concerned TNUHDB field engineers, staff, concerned EEs and contractor</li><li>The Proposed system should serve the broad functions of technical wing<ul><li>Workflow Management</li><li>Project Monitoring and Control with smart review provisions for periodical review and monitoring of progress of works at all sites</li><li>Task Scheduling</li><li>Resource &amp; Material Management</li><li>Collaboration</li><li>Tracking</li><li>Dashboard and Reports</li></ul></li><li>It should be accessible to all stakeholder such as Engineering Department, Project executives, PMU, board of directors and contractors.</li><li>To prepare Standardized Type Design and Estimates including development works like STP, Sump, etc., and to be stocked in TNUHDB Engineers&#39; Portal for utilizing in new construction projects</li><li>Encroachers within the scheme boundaries to be identified and regularized with revised layouts as per TNCDBR in consultation with CMDA/DTCP</li><li>Aadhaar, Ration Card and other details of existing beneficiaries/allottees in all the TNUHDB Scheme to be linked to avoid duplication of the beneficiaries in future allotment</li><li>Survey Sketches to be linked with details of sale deeds and drone surveys to be carried out for mapping with the existing survey sketches for internal reference</li><li>To issue Digital Sale Deeds, in collaboration with Registration Department</li><li>It should capture the entire process of application received from the public for allotments in TNUHDB tenements which will in turn be forwarded to Revenue Department for verification, and then goes for allotment</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Enterprise Resource Planning System</strong></p><p><strong>Human Resource Management System (HRMS) for Administration</strong></p><p>The overall features of the HRMS shall be:</p><ul><li>It should capture and store detailed records of all employees and stores documents like, job descriptions, Aadhar Details, offer letters, appointment letters, performance reviews</li><li>Should automate processes such as Recruitment, onboarding, HR, Exit and for different roles in organization</li><li>It should monitor workers&rsquo; attendance and hours and measure things like employee productivity and absenteeism.</li><li>Should handle employee Feedback &amp; Performance Management</li><li>It should track not only hours worked but also paid time off (PTO)/sick days and benefits information.</li><li>It should store required information on every employee across the organization,</li><li>it should avoid duplicate or inaccurate data that many organizations store in</li><li>various spreadsheets.</li><li>Payroll submodule should fall under this, payroll sub-module automatically distributes pay cheques to employees on a set schedule with the appropriate taxes deducted</li><li>and handles expense reimbursement. It can also provide reports on payroll expenses, total overtime hours and similar KPIs.</li><li>Integration with other departments (e.g., Land registry, Labor, revenue</li><li>department &amp; Aadhar integration)</li><li>Integration with SMS Gateway and Email Server would provide real time notifications for Payroll users and employees.</li><li>The key functions of the module would be<ul><li>Digitized human resource data</li><li>Employee master data</li><li>Employee leave and attendance management</li><li>Employee performance management</li><li>Payroll management</li><li>Employee Service book Management &amp; Statutory compliance</li><li>Status of Court Cases</li></ul></li></ul><p>&nbsp;</p><p><strong>Finance &amp; Account Management </strong></p><p>The major functions of FMS module would be Finance Management, Accounting and Controlling Finances</p><ul><li>General accounting and financial close</li></ul><p>Tools for accounting and financial close support essential bookkeeping activities such as general ledger, accounts payable (AP), accounts receivable (AR) and payroll. They help teams generate reports, create financial statements for income, expenses, and balances &ndash; and close the books quickly and with less effort. Tax management features also help ensure tax accuracy and compliance.</p><ul><li>Revenue, cash, and treasury management</li></ul><p>With revenue accounting tools, finance teams can automate billing processes, view up-to-the-minute payments, and ensure compliance with statutory regulations for revenue recognition. Cash and treasury management tools help teams predict cash flow, improve liquidity, and proactively mitigate risk. This software also integrates with banking systems.</p><ul><li>Financial Planning and Analysis (FP&amp;A)</li></ul><p>This set of planning, forecasting, budgeting, and analytical tools help finance team and their teams support the overall financial health. FP&amp;A is critical for analysing costs and utilisation of schemes, cost savings, improving performance, predicting, and navigating future conditions and providing fast and accurate decision support. It also supports multi-scenario planning and collaboration between finance and every other department.</p><ul><li><ul><li>Governance, risk, and compliance:</li></ul></li></ul><p>It should help teams align organizational activities to business goals, identify and mitigate different types of risk, and ensure compliance with laws and regulations. By synchronizing data across corporate governance, risk management, and compliance activities, organization can operate more efficiently, navigate uncertainty, and act with integrity.</p><p>Financial management solution for TNUHDB could have following set of features,</p><ul><li>Track accounts payable and accounts receivables</li><li>Manage general ledger</li><li>Track of fund flows for various housing schemes</li><li>Track of fund flows from treasury to divisions</li><li>Track and identify the current demand on beneficiary contribution and maintenance charges</li><li>Manage financial transactions</li><li>Payment gateway integration via online as well as POS based system, QR Code, Scanners</li><li>SMS notifications to be sent to the defaulted payers</li><li>Acknowledgement of the payment receipt to be sent to the payee &nbsp;</li><li>Create and store financial documents such as status of Audit Paras, Income Tax Forms (Form-16)</li><li>Automate tasks related to billing, vendor payments, cash management and account reconciliation.</li><li>Integration with procurement/purchase department from Head office for release of money, Head-wise anticipated expenditure through financial management provision</li><li>Finance related to project tendering and construction works</li><li>Financial database which can be viewed and accessed easily by officials whenever required.</li><li>Integration with e-office Tool</li></ul><p><strong>Estate Management for Administration </strong></p><p>This major objective of this module should be overall dashboard of assets providing following information</p><ol><li>List of Assets i.e., lands, Plots, tenements, Offices</li><li>List of Services required for assets like existing vacant lands under TNUHDB Schemes, allotment, transfer, alienate, survey, Infrastructure, and amenities</li><li>Details of Maintenance of the assets, Infrastructure, and amenities (Water supply, Sewer line, Electricity, Lift)</li><li>Details of Revenue collected from tenements, payment arrear details, current demand on beneficiary contribution, maintenance charges and outstanding to be collected</li></ol><p>&nbsp;</p><p>The major features of this modules could be,</p><ul><li>All-In-One that meets every aspect of your estate operational management needs</li><li>Allows for a one-stop management solution of maintenance tasks.</li><li>Provide a seamless link to Service Level Agreements (SLAs) to enforce standards and increase efficiency.</li><li>Enables collection management of rent from tenants for different settlements</li><li>Report generation of collection from various settlements or tenements</li><li>Enables improved forecasting of budgets for maintenance within the town/estate.</li><li>Estate management cover for several areas that include property management, manage operations related finances. Estate management is mainly concerned with the supervising and directing of interest held on rented properties.</li><li>Services of TNUHDB are majorly related to land management, building maintenance, rent collection etc. hence, estate management should be a part of this integrated system.</li><li>In case of TNUHDB, estate Management module would help Revenue wing of Admin department. It would help maintain details of property maintenance and collecting the rent from rented properties.</li><li>This module can be a part of Administration section where different wings will cover and monitor respective activities mentioned below. Also, it can be integrated with other department&rsquo;s portal/site would be done for the mapping of data (if required).</li></ul><p><strong>Office Administration</strong></p><p>The major functions of Administration module would be:</p><ol><li>Tapal Management</li></ol><p>Key functions of Tapal Management would be to manage dispatches in organization</p><p>It would have following features</p><ul><li>Inward</li><li>Outward</li><li>Reminder/Follow up</li><li>Report</li><li>Personal Address Book</li><li>Expense Entry and Graphical summary</li></ul><p>&nbsp;</p><ol><li>Vendor Management</li></ol><p>This would manage the vendor onboarding and performance monitoring of vendors</p><p>It would have following features</p><ul><li>Procurement</li><li>Vendor Onboarding</li><li>Performance Management</li><li>Financial Controls &amp; Compliance</li><li>SLA Management</li></ul><p>&nbsp;</p><ol><li>Legal Resource Management</li></ol><p>This would manage the documents for all the legal matters such as court cases and hearings for judicial cases.</p><p>It should have following features</p><ul><li>Create draft</li><li>Review draft and approval</li><li>Document repository</li><li>Recorded Minutes of meetings</li><li>Contracts for review</li><li>Sharing of Documents</li></ul><p>&nbsp;</p><ol><li>RTI Request and Appeal Management Information System (RTI-MIS)</li></ol><p>This should enable users to keep track of all RTI applications, submitted response, appeals and their response. This data should be digitized and should be stored in repository for future reference and as a digitized back up copy. This module should have role-based access control approach for accessing all the documents in this module and repository. Generally, a public information officer should have access to this module which should have functions like RTI dashboard where all RTIs should be categorized as per their status like new, pending, responded, and marked to first Appellate authority (FAA).</p><ol><li>Fleet Management</li></ol><p>This module should track all the vehicles and control overall fleet operations. Also, should help to manage complete fleet control operations. Every vehicle servicing should be documented and accessible by Vehicle number, driver name and on-road time. It should cover the entire life cycle of the vehicle from purchase, usage, maintenance, and disposal.</p><p>&nbsp;</p><ol><li>Visitor Management</li></ol><p>Visitor management should offer an appointment portal for visitors by which they should digitally take the appointment from the concerned person. Visitors should issue a digital visitor id card by using the visitor portal, which retains all the specific information needed. Employees and co-worker should have accurate information about visitors</p><p><strong>Citizen Web Portal</strong></p><p>The proposed portal should be Multilingual (Tamil and English language) Web portal and with mobile (Android/ IOS) device support, having the content in Unicode format</p><p>The major modules of the portal would be as following</p><ol><li>Citizen Online Services: Where all citizen related services would be listed for ease in accessibility to TNUHDB services</li><li>Grievance Redressal Management System: This would be additional module to existing web portal where citizens, tenant and allottees can register their grievances about processes, operations, register complaints about departments or individuals.</li><li>Housing Need Assessment and Survey: This should provide survey space for citizens to register their housing needs in current situations.</li><li>Community Development Information System: Community Development Information System (CDIS) should serve dual purpose: a) Build Information system for all the development programs b) Rehabilitation Monitoring System (RMS) c) Division wise MIS report containing RWA formation &amp; Registration status, Matching Grants status, TNUHDB&#39;s Recognition status, Maintenance Committee formation &amp; Charges collection, Skill training status, Awareness Programme/Cleaning Camps and GRM d) Community development activities - Youth Club activities for identifying the potential talents within the scheme</li></ol><p>The basic features of the web information portal should be as follows:</p><ul><li>Should have aesthetically designed website and mobile applications, which should be highly user friendly, Search Engine Optimization (SEO) and Social Media Optimization (SMO) friendly and compatible with all the latest browsers (such as Internet Explorer, Mozilla, Google Chrome, Opera, Safari) and technologies</li><li>Content for Portal and Mobile app will be as per the inputs from TNUHDB. The content should be finalized in consultation with TNUHDB&nbsp;</li><li>Should have dynamic Content Management System for managing web portal. The targeted audience would be</li><li>Internal Stakeholders like TNUHDB Officials and Employees</li><li>External stakeholders like Citizens, Beneficiaries etc.</li><li>Mapping of the existing content, Editing, Formatting of Documents and Conversion in web pages for Tamil and English</li><li>Mapping of existing applications and selected dynamic features of the existing web portal into new design of the web portal</li><li>Delivery mechanisms for all type of contents</li><li>Hosting of web portal on user department server or on cloud</li><li>Should have at least the following information content on the web portal<ul><li>General information about TNUHDB, its mission, goals, and vision etc.</li><li>Organizations Details like, Chart, functions, Achievements over the year</li><li>Annual Reports</li><li>Links to Projects, Housing Schemes&nbsp;</li><li>Training details for Community wing</li><li>Documents or publications for Citizens</li><li>Citizen Charter and Grievance Redressal Management System</li><li>List of all Active and Archived Tenders- possible integration with e-procurement website</li><li>Contact Us</li><li>Frequently Asked Questions (FAQs)</li><li>Photo gallery</li><li>Sitemap</li><li>Hit counter</li><li>Help manual (Text and Video based) on various key functionalities of Portal&nbsp;</li><li>Important links - to websites pertaining to Government of Tamil Nadu (all Government Departments, Madras High Court)</li><li>Link to social media page of TNUHDB on various social media portals such as Facebook, Twitter, YouTube, and others if any</li><li>Option to select language (Tamil and English) to view Portal and mobile app in desired languages</li><li>Other content as specified by TNUHDB from time to time&nbsp;&nbsp;</li></ul></li><li>Should implement necessary security features against hacking and defacement</li><li>Should be comply with all the requirements as stated in &ldquo;Guidelines for Indian Govt. Websites&rdquo; (GIGW)</li><li>In addition, this web portal should ensure adherence to IndEA Framework (Agile India Enterprise Architecture</li></ul><p><strong>Employee Portal</strong></p><p>TNUHDB Intends to build a portal for all internal users of TUNHDB where they can access to their assigned task, assigned tickets, training schedule as a part of capacity building.</p><p>This portal will focus on 3 major areas which are</p><ol><li><strong>Task Dashboard:</strong></li></ol><p>This portal should have employee task dashboard which should provide list of assigned tasks and deliverables through project management system, also this portal would be integrated with grievance redressal management system and tickets will be generated and assigned to employees based on their role and responsibilities. This Task dashboard should play vital role in evaluating employee&rsquo;s performance, thus, to be integrated with HRMS module of ERP.</p><p>&nbsp;</p><ol><li><strong>Knowledge Management System (KMS):</strong></li></ol><p>The purpose of the knowledge management is to ensure that right information is available to the right person at the right time to enable informed decision making. The KMS should be integrated with the DMS, selective sections of the PMS module and HRM module for information dissemination.</p><p>KMS should be single sign on application or module that should automates the administration, tracking and reporting of access to various documentary resources</p><p>Additional Learning Management System should be part of this offering which would allow users to access all training and capacity building programs from employee portal</p><p><strong>3.MIS Dashboard</strong></p><p>This dashboard should provide vital information to manage an organization effectively. MIS reports should provide insights related to business operations such as Engineering, Administration, Finance, employee performance, Community Development wing, revenue generated, customer queries, inventory, and information on all assets that is important to the management of a business.</p><p>MIS reports should be used by many large businesses that need daily reporting</p><p><strong>Enterprise Support Applications</strong></p><p>All the process or department specific interventions work to achieve specific objective. However, the there is need of some support tools which should support the main interventions or applications in achieving their objective effectively.</p><p>These business support tools are mainly:</p><p><strong>Document Management System (DMS)</strong></p><p>As an e-Governance initiative, all the public organisations are implementing enterprise Document Management System, which intends to create an integrated platform for performing key business functions, establish a Centralized Document Repository to store and route documents electronically and reduce paper-based work to achieve Paperless Office, improve productivity and provide a unified platform for the users to transact with inter/intra department and existing or upcoming IT systems.</p><p>Key considerations for Document Management System (DMS)</p><ul><li>The Document management solution should be in line with industry standards, legal requirements and Government of India requirements as prescribed from time to time apart from conforming to the Workflow processes of Tamil Nadu Government.</li><li>It should be implemented at the enterprise level including all the offices of the TNUHDB viz. Head Office, Divisional Offices and Estate Offices.</li><li>In terms of broad architecture, DMS should be centrally hosted system running from TNUHDB&rsquo;s central repository which will be on premise or on cloud and will be available to all TNUHDB offices through its Wide Area Network (WAN).</li><li>The devised solution should meet the required performance parameters and sustain the growing requirement.</li><li>It should be capable to handle multiple languages, English and Tamil</li><li>It should have the capability for scanning and capturing of documents for bringing them in the DMS System.</li><li>It should also work seamlessly with the paper based inward system TNUHDB or should have capacity to integrated with dispatch management system (Tapal Management System)</li><li>The system should have very efficient retrieval capabilities with proper indexing, which should be easy, convenient, and quick in referencing and retrieval of any document, data, record etc.</li><li>This DMS should be tightly interfaced to the TNUHDB&rsquo;s In-house application and other platforms like ERP, Project management, Helpdesk and other major applications to meet the business requirements as also other application such as the Share Portal for single sign on etc.</li><li>Once implemented it all the metadata/ data of exiting system should be migrated to this DMS. Also, the new data to be digitized and stored on DMS for efficient use of DMS.</li><li>Key features of DMS should be audit trail, document retention control, Analytics, Document security, data extraction, workflow, and version control.</li></ul><p><strong>Content Management System</strong></p><p>An enterprise level Web Content Management System should be used to meet the need to manage the content of web portal. It should manage content including media of, landing pages, Project Pages, Document repository etc. on the web portal which needs to be added / modified / edited / deleted should be done with ease without support from technology team.</p><p>The content Management System should support following functions and should have following features:</p><ul><li>User should be able to design and incorporate blog and promotional landing pages as part of the website ecosystem.</li><li>It should provide the following security features: Audit Trail, Captcha, Login History, Problem Notification and SSL Support.</li><li>System should offer the following ease-of-use features: Spell Checker, Glossary and Preview Content before publishing, Font type and size should be uniforms across all the pages.</li><li>Admins to receive SMS/E-mail alerts immediately in case of any emergency or unauthorized access.</li><li>The CMS should create SEO-friendly URLs for each page. If pages are later moved or renamed, CMS should configure an HTTP 301 Permanent Redirect to notify search engines. Also, should have features for users to override such Automatic activities to customized settings. The proposed CMS should have built-in support for SEO like Meta tags, Canonical URLs, extension less URLs.</li><li>The CMS Should build the Sitemap.xml file automatically based the site map created in the CMS.</li><li>The CMS should have a backend with editors previewing personalized pages, which can filter by more than one segment to see how a page will display to users in multiple segments.</li><li>The CMS should have multiple site management to manage a collection of websites and microsites through a centralized interface. The Content authors should be able to easily contribute to multiple websites or utilize content from other websites. Also, CMS should be easily able to share and synchronize Users, roles, content, permissions, and templates between sites.</li><li>The CMS should have a detailed logging of all activities performed by the Backend user on the CMS and features in the Audit trail module to track changes and actions in the system. Also feature to register events such as when a page disappears because it was deleted or moved, when the content of a page is broken due to the widget having been updated, or when an image reference is broken. Also log changes in the configurations.</li><li>It should have intuitive dashboard to manage all the tasks involved in content production including scheduling content, monitoring threats, tracking user activity, installing modules and plugins, and reviewing performance analytics, social media analytics among other responsibilities.</li><li>Responsive themes for establishing a consistent look and feel across the Portal including customizable templates to manage content presentation.</li><li>Content Publishing Tool to easily create content (including Multi-language Content) using WYSIWYG editor, publish different types of content, Content organization structures, e.g., hierarchy and taxonomy, versioning, and workflow management.&nbsp;</li><li>Built-in SEO Tool to optimize content for search and improve chances of ranking.</li><li>Social media integration to schedule and publish posts on social media platform.</li><li>Permission-based access control including user and group functionality, delegation between user groups.</li></ul><p>&nbsp;</p><p><strong>GIS Mapping</strong></p><p>The GIS mapping for TNUHDB will allows users to organize, visualize and analyse different layers of data by creating maps and scenes.</p><p>With the ability to clearly visualize different types of data, users are enabled to uncover patterns, understand trends, monitor changes, and respond to events&mdash;facilitating better decision making.&nbsp;</p><ul><li>The major use of GIS could be in planning of rehabilitation or housing schemes, identification and mapping of Social Infrastructure facilities in and around the scheme boundaries, where the boundary of each slum will be marked on the GIS base map of planning area with the help of satellite image and using GPS</li><li>This mapping platform should bring all required information on a map layer and can be used for land identification, land finalization, planning and implementing projects.</li><li>Accordingly, GIS base map can be prepared which would contain:</li><li>Key physical features such as road, rivers, railways, water bodies and important landmarks.</li><li>Land use and land cover</li><li>The survey and housing need data collected from various data sources should illustrate demand by area wise. It should help in geo mapping of income groups area wise and can help plan projects or housing schemes.</li><li>This platform will connect with various in-house applications like Project management tool, Estate management module of ERP etc.</li></ul><p><strong>Business Intelligence &amp; Analytics Engine</strong></p><p>TNUHDB should implement a BI tool/ Analytics engine to generate insights from the collected data from various sources.</p><p>TNUHDB should implement a BI tool/ Analytics engine to generate insights from the collected data from various sources.</p><p>This BI engine should have following components broadly</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Analytics and Reporting</p><ul><li>A GUI based system where all business users should be able to view/ save/ download/ schedule various enterprise metrics/ dashboards and their summary without any programming efforts</li><li>It should be capable to filter all key business metrics based on various parameters</li><li>It should be capable to pull the report for a specified performance period in a pivot table and different graphical layout</li><li>It should compare metrics across various parameters in a chart or graphical formats</li></ul><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Automated Dashboards</p><ul><li><ul><li>It should produce dashboards without the help of IT team for system integration and publish it for the consumption of department users</li><li>It should enable user of making ad-hoc query through SQL commands as well as GUI based design (drag and drop) along with rich analytical functions</li></ul></li></ul><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data Management</p><ul><li>It should be compatible with different data storages like Flat file storage, relational databases and big data storages</li></ul><ul><li>Should supports on-demand processing with its own data ETL process</li><li>Functionality for admin users to create new dimensions, derived metrics etc.</li></ul><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting Tool</p><ul><li>The Reporting tool with ability to schedule reports.</li><li>Should have robust visualizations such as graphs, charts, and histograms. Should have slicing and dicing features</li><li>It should provide output data in various formats like PDF, Images.</li><li>It should have strong data Visualization like heat maps, spark lines, geographical mapping, spider charts etc., preferably with auto charting and dashboard facilities</li><li>through the key words</li></ul><p><strong>Helpdesk Support for Users</strong></p><p>Helpdesk support application enables end users to raise and resolve trivial issues, track ticket status, and manage approvals with a self-service portal. It Provides higher end user satisfaction levels by defining appropriate SLAs and making sure that services are delivered on time, and incidents are resolved well within SLAs. Key functional requirements of IT helpdesk tool are:</p><ul><li>Creation of site-specific incident and request SLAs by users</li><li>Auto assigning of SLAs to tickets based on incoming ticket parameters</li><li>Multi-level escalations, with custom templates for response time SLA, and resolution time SLA escalations.</li><li>Reassignment of tickets to other technicians or support groups and resetting of ticket parameters like priority on SLA escalations.</li><li>Enable access control of workstations remotely through VNC (Virtual Network Computing) applications</li><li>Generate reports on all pending or completed tickets based on parameters such as department, level, mode, priority, requester, technician, category, and request date.</li><li>Monitor Support performance by generating reports on SLA compliance with real-time IT help desk dashboards.<ol><li><ol><li>Administration - User Management, Workflow management, Audit-Trail</li></ol></li></ol></li></ul><p>The Administration module should have the following features or capabilities.</p><ol><li>Should allow TNUHDB team to manage the stakeholders accounts with TNUHDB Information Portal and Digitalization system</li><li>Should allow to provide role-based access to TNUHDB staff and Portal users.</li><li>Should allow to provide access to TNUHDB Staff on portal modules including specific functions of module such as view, delete, search, download, print and others.</li><li>Should allow external stakeholders to register with TNUHDB employee portal</li><li>Should allow to perform the functions like add, edit, delete, block, unblock, reset password and other related operations for user accounts of TNUHDB staff and users registered with TNUHDB employee Portal</li><li>Shall support the creation of workflows which shall be implemented using an automated workflow management system</li><li>Should support creation of secondary workflows as well, which would be fully integrated with the primary workflows</li><li>Should be able to support/configure complete workflow required for successful coverage of various processes of TNUHDB departments related to this project</li><li>Should allow designing of workflow with the ability to define business rules, process flows, alerts, and triggers without programming</li><li>Should automatically raise alerts, messaging, notifications, emails etc. across functional areas/ modules and concerned stakeholders based on the various timelines assigned for tasks or if an attempt is made to amend the entries already entered in the system</li><li>Should allow authorized user to configure the workflow as per the guidelines of the department for handling the processes successfully. The workflow management/ control should provide consistent method of defining business rules, process flows for all TNUHDB offices and concerned stakeholders</li><li>Mandatory approval should be uploaded in the application prior to making any changes in the workflow. Audit trail of the modifications should be maintained in the system</li><li>Should have a maker-checker workflow for peer approval for created stakeholder accounts, updating in scheme information sharing request made by board Members and other modules for which the workflow would be required</li><li>Should capture the portal user activities like login &amp; logout time, portal module accessed, search keywords, documents downloaded &amp; printed, information requested and other functionalities</li><li>Should generate various audit-trail report with drill down information, for the portal user activities</li><li>Should send notifications (through E-mail and/or SMS) to Portal Administrator upon attempting to perform above mentioned functions by TNUHDB Staff</li><li>Other related requirements specify by TNUHDB team<ol><li><ol><li>Mobile application</li></ol></li></ol></li></ol><p>SI to develop mobile version (lite version) of the TNUHDB web Portal with specific functionalities which can be accessed using smart phone/tablets. The Mobile application are to be developed for TNUHDB internal and external stakeholders including TNUHDB Officials, Citizens, beneficiaries, RWA&rsquo;s and applicants.</p><p>While the detailed functionalities will be finalized during the SRS stage, the indicative high-level functionalities for Lite version are as provided below:</p><ol><li>TNUHDB Information Portal home page with user management features</li><li>Allows the portal user to search, view, download the desired information online including housing schemes GR, announcements, and scheme details</li><li>Allows the applicant user to fill up online applications</li><li>Allows the applicant to track the status of their applications</li><li>Allows the raise grievance and complaint about services being offered by TNUHDB</li><li>Allows the beneficiaries to raise and track maintenance request for their tenements &nbsp;</li><li>Allows the TNUHDB officials to view the dashboard and reports</li><li>Allows the Beneficiaries to pay maintenance and other payments needed to be paid to TNUHDB via Online and to be linked with RWA&#39;s with the status monitoring of Income and Expenditure details of RWA&rsquo;s</li><li>Allows the portal user to share their feedback, grievance on portal</li><li>Other required functionalities such as RWA Module with features such as - Rules &amp; Regulation, Database on the RWA formed and their renewal period, matching grant issued and regular payee, defaulters of maintenance fees, announcements related to activities such as Skill development, Job Training, etc&hellip;</li></ol><p><strong>Technical requirements</strong></p><p>Technical specifications provided here are the set of requirements that the Digitalization solutions including TNUHDB web Portal &amp; Mobile Application of TNUHDB must meet. This document provides information to the SI on the business requirements, various standards and guidelines and is an essential guide for defining a proposed system and ensuring mutual understanding among key stakeholders.</p><p>All the technical specifications provided in this section are minimum and have been provided for immediate reference only.</p><p>All the software (if any) along with proposed solutions shall initially be supplied with minimum on-site OEM comprehensive warranty/ support from the date of Go-live till the entire contract period. Also, if the contract period is extended, then SI must ensure that all the supplied software&rsquo;s OEM warranty, service and support, licenses should be till perpetuity and for unlimited users. Please find below the summary of the software component for which the license would be required.</p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:28.05pt; width:25.3pt\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; height:28.05pt; width:225.75pt\"><p><strong>Software component</strong></p></td><td style=\"background-color:#4472c4; height:28.05pt; width:102.2pt\"><p><strong>Type of license / Licensing period</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:28.05pt; width:89.2pt\"><p><strong>Number of licenses</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:16.25pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:225.75pt\"><p>Integrated Project Management System</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:28.05pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:28.05pt; vertical-align:top; width:225.75pt\"><p>ERP System- Human Resource Management System Module</p></td><td style=\"height:28.05pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:28.05pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.05pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:225.75pt\"><p>ERP System- Finance and Account Management Module</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:17.15pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:17.15pt; vertical-align:top; width:225.75pt\"><p>ERP System- Office Administration Module</p></td><td style=\"height:17.15pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:17.15pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:16.25pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:225.75pt\"><p>ERP System- Estate Management Module</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Citizen Web Portal</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>Citizen Mobile Application</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Employee Web Portal</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.05pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:225.75pt\"><p>Smart Module- Water, Energy &amp; Video Management and Remote Monitoring</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Helpdesk Application</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Subscription</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>Web Content Management System</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Documents Management System</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>GIS Software &amp; base Map</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Subscription</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"border-color:#8eaadb; height:15.35pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:15.35pt; vertical-align:top; width:225.75pt\"><p>BI &amp; Analytics Platform</p></td><td style=\"height:15.35pt; vertical-align:top; width:102.2pt\"><p>Subscription&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"height:15.35pt; vertical-align:top; width:89.2pt\"><p>At actual</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><ol><li><ol><li>Design, Develop and Implement the TNUHDB Information Portal</li></ol></li></ol></li><li>Application must be web based, built on enterprise application platforms, use multi-tier/ N tier application architecture with sufficient flexibility for customization based on TNUHDB requirements.</li><li>The Application should be built on enterprise application platform with flexibility to implements desired Modules / Functionality and should have Multiple User Access modes like GUI, Web, Portal etc.</li><li>The project management system and ERP application shall have inbuilt automated workflow management system, document management system</li><li>The application shall be integrated with all the required third-party services.</li><li>The application shall support all popular/ common web browsers i.e., Google Chrome, Mozilla Firefox, Internet Explorer, Microsoft Edge and Safari.</li><li>The application home page should at least have the following.<ol><li>Homepage should be attractive and well-constructed, so that it makes a good first impression to all who visit the site</li><li>Key topic areas should be presented in order of importance and should be easy to read.</li><li>Homepage should clearly communicate the site&#39;s purpose and show all major options available on the Web site.</li><li>Most of the homepage should be visible above the fold,  and should contain a limited amount of prose text.</li><li>Easy access to the homepage should be provided from every page in the site.</li></ol></li><li>The application layout should at least have the following.</li></ol><ol><li>All items should be appropriately aligned on the pages and layout should be consistent on all the related pages.</li><li>Style &amp; colour scheme should be consistent across the site</li></ol><ol><li>The navigation on the application page should at least have the following.</li></ol><ol><li>A Web Portal navigation scheme and features should allow users to find and access information effectively and efficiently</li><li>Navigation tabs should be located at the top of the page, and look like clickable versions of real-world tabs</li><li>The navigation elements should be clearly differentiated from each another and should be placed in a consistent way so that it can be easily located on each page</li><li>Site maps should be available with all the links of pages existing on the website and link for the site map should be clearly visible on the homepage</li></ol><ol><li>The application Heading, Titles &amp; Labels should at least have the following.</li></ol><ol><li>Headings should be used in their appropriate HTML order and heading levels should not be skipped</li><li>All pages should have category labels including links and clearly reflect the information contained within the category</li></ol><ol><li>The SI must deploy a software development methodology that ensures rapid deployment of the applications in such a way that the users are continually involved in the development process, and minimum iterations are required before the final Go-live of the integrated solution.</li><li>From the integration perspective, the SI must consider necessary interfacing requirements (both at the application and data level). Appropriate interfaces must be provided for seamless integration. Such interfaces shall follow industry standards such as web services. If such a need arises, the SI shall be responsible for creating such a required web service or API, etc. for the same. This includes, but not limited to, the integration with the TNUHDB Department Applications or any other external Departments.</li><li>Should be operational for the next 20-25 years and the changes and advances in the field of information and technology should be able to be incorporated in the system. If necessary, adapt to the new technologies and upgrade the system accordingly. It should be possible to use all the data in the system by transferring it properly in the new environment<ol><li><ol><li>Design and Development of Mobile Application</li></ol></li></ol></li></ol><ol><li>The mobile application shall also be available on Mobile for both Android and iOS platform</li><li>The mobile application should work flawlessly across different platforms</li><li>The mobile application should be user friendly and shall have modern UI/UX and feel.</li><li>The mobile application should provide on screen tips and online help to aid users while interacting with it.</li><li>There should be minimum use flash contents so that home page should be loaded quickly</li><li>It should not occupy excess client&rsquo;s Mobile RAM</li><li>Design should not be font dependent. The content of the site should be readable with default standard fonts.</li><li>The mobile application should be responsive so that it should adjust as per the screen size. Thus, design should be compatible with tablet, mobile phone and other handheld devices.</li><li>The mobile application should enable ease of configuration.</li><li>Should provide Role Based Access control</li><li>Should be able to capture and track all events at device and console.</li><li>Should come with mobile threat prevention and recovery system</li><li>Should support authentication using digital signatures</li><li>Should have facility to download and upload files</li><li>Incorporate analytics into mobile app, to track and identify users experience and actions.</li><li>Apps should be easily customizable and easy to Administer data in the TNUHDB Information Portal and Digitalization system database</li><li>Network level security, traffic should be encrypted using secured connectivity</li><li>Should support real time information via GPS availability</li><li>Should structure overall content with proper tagging to make them screen reader friendly.</li><li>Mobile Application should cater all the functionalities specifically mentioned for Mobile application in FRS.</li><li>Should be operational for the next 20-25 years and the changes and advances in the field of information and technology should be able to be incorporated in the system. If necessary, adapt to the new technologies and upgrade the system accordingly. It should be possible to use all the data in the system by transferring it properly in the new environment<ol><li><ol><li>System Architecture</li></ol></li></ol></li></ol><ol><li>The System shall be designed, implemented, and deployed by considering the scalability, reliability, security, business continuity, optimum performance of the entire solution and based on the requirements of TNUHDB.</li><li>The system architecture needs to be designed in a manner that will be based on loosely coupled components making it easy to extend.</li><li>The solution architecture designed should have seamless integration among all the components of the envisaged solution and should be designed as per industry standards and best practices. The solution design shall include, but shall not be limited to,</li></ol><ol><li>the design of the application architecture,</li><li>user interface,</li><li>database structures,</li><li>security architecture,</li><li>network architecture,</li><li>service-oriented architecture (SOA)</li><li>deployment architecture,</li><li>Unified Modeling Language (UML) diagrams,</li><li>User Interface (UI),</li><li>database schema</li><li>role-based user access management system and configure authentication-based access for various users of the system.</li></ol><ol><li>The system design must be such that the developed solution is technology neutral and can be deployed and hosted at Cloud platform (MeitY empaneled Cloud Service Providers (CSPs))</li><li>All the modules/ components of the proposed applications should be deployed in centralized manner/ platform.</li><li>The architecture should be highly scalable and capable of delivering high-performance as and when transaction volume increases. It is required that application and deployment architecture should provide the flexibility of Scaling-up (vertical scaling) and Scaling-out (horizontal scaling) on Application and Web Servers, Database Servers, and all other solution components.</li><li>The system should support clustering and high availability.</li><li>The system should allow addition of more modules/ sub-modules and more users without affecting the performance of overall application/ other functioning modules.</li><li>The system should support customization to meet the project requirements. In case need for customization arises, the same should be done in the form of add-ons and routines/ patches that can be plugged/ unplugged from the base software package as the situation arises.</li><li>The system should provide facility for &#39;single point data entry at source&#39; and fully integrated, unified, and interfaced so that there are no redundancies. It should have the ability to have an update occur in one module and be immediately available to all other modules of the system even among geographically dispersed sites.</li><li>The system should have real-time data update among modules.</li><li>The system should be supported by 2022/2023 latest versions of all popular web browsers such as Internet Explorer (IE), Microsoft Edge, Mozilla, Google Chrome, Opera, Safari, etc. for common desktop and mobile, smart phones and tablets.</li><li>The system design must be such that requires minimal installation, if at all, at the user&rsquo;s end, besides the Internet Browser (except where offline desktop/mobile apps are to be mandated).</li><li>The system should in compliance with website and accessibility standards such as GIGW and others.</li><li>The SI shall ensure consultation with TNUHDB officials for finalizing of design components including the UI, the mode of data entry, storage and retrieval, MIS reports, queries, the application design, and others as applicable.</li><li>The system design should have a data integration strategy for integrating internal and external data sources (if any)</li></ol><p>&nbsp;</p><p>The solution architecture should be designed by SI in line with the requirements provided in RFP document.</p><ol><li>As specified above, the application should have multiple layers as described below:<ol><li><strong>Presentation Layer:</strong> This layer should be web-enabled and should run on all major web browsers. This layer interfaces the business components and implements automated data workflows for GUI initialization, loading, saving data, enabling, and disabling forms. Multi-language support is also implemented at this layer which allows runtime modification of terms and phrases.</li><li><strong>Service layer:</strong> This layer contains a class library which takes care of inter-operability and open standard/ protocols like web service, windows services, APIs, which make this Business Layer a platform independent. This layer is used to give functionality for data exchange using web services-based component or database synchronization with external agency.</li><li><strong>Business layer:</strong> This layer should implement the process flow and logic that drives the business functionality. Framework should have provision to keep all the user activity to be audited and logged during the business process.</li><li><strong>Persistence layer:</strong> It has been visualized that the application for this project would be managing very high volume of data, storing a large amount of data for long-term preservation of records at various repositories. It is mandatory for the SI to ensure faster access and better manageability of this data. It is expected that the SI shall consider mechanisms which would improve the performance of this layer.</li><li><strong>Data layer:</strong> Data layer will have Data Access class library which provides methods for exchanging data between business components/ layer and databases/ persistence layer.<ol><li>Internet and Intranet Enabled</li></ol></li></ol></li></ol><ol><li>The TNUHDB Information Portal should support access via LAN, WAN, and Internet with secured connectivity.</li><li>The system should be scalable and flexible enough to provide access and information to all the users from the different functions/ departments/ offices of TNUHDB and other key stakeholders.</li><li>The system should support all TCP/ IP/ SMTP/ or any other related protocols.<ol><li><ol><li>Graphical User Interface</li></ol></li></ol></li></ol><ol><li>The system should be user friendly and should have interactive Graphical User Interface (GUI).</li><li>All the application modules and sub-modules shall use uniform theme in the GUI. The application should be consistent in the sequences in the visual presentation to the user and in use.</li><li>The system should have sufficient validation checks at GUI/ presentation layer for validating the data formats, completeness of the forms in terms of mandatory fields, checking for file type and size of files uploaded etc.</li><li>Online forms should have mandatory fields marked out clearly. The system should not allow submission of the form without completing the mandatory fields.</li><li>The system shall support uploading of scanned documents. There must be check(s) for ensuring the upload of all the mandatory documents.</li><li>It should have provision for warning and alert messages in case of validation failure, incomplete data etc.</li><li>It should have facility to display confirmation/ warning windows for deletes changes etc.</li><li>The system should have responsive themes for establishing a consistent look and feel across the Portal including customizable templates to manage content presentation.</li><li>The system should provide consistent screen layouts and access methods across all modules so that they look and behave the same.</li><li>The system should provide various reports/ MIS in graphical and tabular views along with facility to drill down to navigate to the next levels of details and so on.</li><li>The/ user interface shall give flexibility to toggle between graphical and tabular views, and tile different views in the same interface.</li><li>User specific/ customized dashboard should allow authorized user to act on pending activities in a secured manner in a system seamlessly integrated with other modules of the application. Submission of every activity in the system should suitably update database on real-time basis.<ol><li><ol><li>Workflow Integration Approach</li></ol></li></ol></li></ol><ol><li>The application shall support the creation of workflows which shall be implemented using an automated workflow management system.</li><li>The application should support creation of secondary workflows as well, which would be fully integrated with the primary workflows.</li><li>The application should be able to support/ configure complete workflow required for successful coverage of various processes of TNUHDB. It should allow designing of workflow with the ability to define business rules, process flows, alerts, and triggers without programming.</li><li>The application should automatically raise alerts, messaging, notifications, emails etc. across functional areas/ modules and concerned stakeholders based on the various timelines assigned for tasks or if an attempt is made to amend the entries already entered in the system.</li><li>Mandatory approval should be uploaded in the application prior to making any changes in the workflow. Audit trail of the modifications should be maintained in the system.</li><li>The application should allow devising of simple or complex rules to suit TNUHDB requirements and the requirements specific to certain stakeholder(s). The rules should be stored in a central repository and the same must be shared across all business processes.</li></ol><p><strong>Integration</strong></p><ol><li>The system should be designed to ensure that current and new applications can be seamlessly integrated (through an application integration solution) within its architecture with minimal impact and changes.</li><li>The system should be fully integrated across modules and functional areas.</li><li>Identify the data/ services which is to be exchanged between the application and other internal/ external systems.</li><li>Identify integration touch points for ensuring seamless integration with these internal/ external systems and TNUHDB application.</li><li>The application should support integration with the following (but not limited to) application/ systems:</li></ol><ol><li><strong>Gateway: </strong>The application should employ the following gateways through API integration:<ol><li><ol><li><u>API Gateways:</u> An API gateway to bring applications together to perform a designed function built around sharing data and executing pre-defined processes. It should work as intermediate application to build new programmatic interactions between the various applications people and businesses use daily.&nbsp;</li><li><u>Web Gateway:</u> A web gateway to allow exchange of messages with other computer systems using the standard Hyper Text Transfer Protocol. The application shall utilize a web gateway to allow users to access the application using browsers.</li><li><u>Mail Gateway:</u> The application should provide the user to send and receive formal communication, confirmation, status, alerts, messages, reminders, notifications etc. via email. SMTP server should be implemented to push system generated emails to users and receive the email from Help module of the TNUHDB Information Portal.</li><li><u>SMS Gateway:</u> The application should be integrated with SMS gateway for sending confirmations, status, alerts, reminders, notifications, messages etc. via SMS. The application shall utilize a SMS gateway to send SMS notifications such as application status, demand dues, scheme information etc.</li></ol></li></ol></li><li><strong>Other Integration:</strong> The application should be integrated with the following external systems to access respective functions for sending and receiving desired/required data.<ol><li><ol><li><u>TNUHDB applications:</u> The respective TNUHDB existing applications such as Member Information System will be integrated to fetch information of scheme and display the same on TNUHDB Information portal.</li><li><u>Social media portals:</u> The social media portals such as Instagram, Koo, Facebook, Twitter, YouTube of TNUHDB should be linked from TNUHDB portal to navigate to these social media portals.</li><li><u>Tamil Nadu General Administration Portal (For GR):</u> The Government Resolution (GR) section under Tamil Nadu Government website www.tn.gov.in should be linked to or make a provision to upload respective GR for linking it to respective subject under GR.</li><li><u>Supreme Court &amp; High Court systems:</u> The respective applications (e.g. sci.gov.in / ecourts.gov.in / https://www.hcmadras.tn.nic.in ) for Supreme Court and High Court should be linked for the details of respective Court ruling to link it to respective subject under TNUHDB.</li><li><u>Other systems:</u> The other system which may be identified during the implementation of TNUHDB Information portal shall be linked to fetch required data/information.</li></ol></li></ol></li><li><strong>Digital certificate services</strong>: The application should be DSC enabled.<ol><li><ol><li>Installation/ Upgrade/ Enhancement</li></ol></li></ol></li></ol><ol><li>The system should facilitate seamless upgrades (deployment of patches/ new version) without any adverse impact on the system and its components.</li><li>The SI should provide notification and patches for system enhancements and fixes to the application after implementation on a proactive basis.</li><li>The system should have facility to maintain versions with changes/ modifications made in each release.</li><li>The SI shall ensure that future upgrades, enhancements, and bug fixes are not impacted. Every custom development must be documented in detail and the code/script should be properly annotated with comments.<ol><li><ol><li><em>Scalability</em></li></ol></li></ol></li></ol><ol><li>The system should be scalable to handle the peak load coming from different types of users i.e., Internal and External Users, and should support high volume of data upload, without compromising response time or efficiency of the system.</li><li>A load balancer should be deployed to optimize resource use, maximize throughput, minimize response time, and avoid overload of any single resource.</li><li>Scalability of the solution is to be achieved at least along the Dimensions described below:<ol><li>Scalability in terms of the volumes of transactions handled: This translates to the facility to enhance the hardware, software, and network capacities to maintain the performance levels always in tune with the SLA metrics.</li><li>The system should allow addition of more users as and when required, without affecting the performance of overall application/ other functioning modules.</li><li>Scalability in terms of addition of new services of an existing department: This translates to seamless and effortless integration with the backend application such that new services can be added and deployed with relative ease.</li><li>Scalability in terms of addition of new departments: This translates to seamless integration with heterogeneous systems at the backend with relative ease of deployment of the applications and services, maintaining the common look and feel and functionality at the front-end.</li><li>The system should allow addition of more modules/ sub-modules without affecting the performance of overall application/ other functioning modules.</li><li>Scalability in terms of addition of new channels of delivery: This translates to designing the systems suitably to provide services through other delivery channels like the mobile devices and other devices.<ol><li>Security</li></ol></li></ol></li></ol><ol><li>The system should provide well-designed identity and privileged access management system, security of digital assets, data, network security, backup, and recovery/ disaster recovery system.</li><li>The system should be free from OWASP (Open Web Application Security Project) Vulnerabilities</li><li>Captcha to be implemented to prevent password cracking tools.</li><li>Secure mechanism of changing the password in lost/forgotten scenario for the authorized administrators.</li><li>The system must have proper security and maintenance facility with access control features for controlling the access rights over the system and over the various functions/ features available for different types of users.</li><li>Website/portal should be able to generate mail Alert and historical report in the security report viewable to the administrator containing the Time, IP address of attackers, the page under attack, and the parameter under attack with the attack values.</li><li>There should be a provision of blocking any IP or Network by assigning IP Address range from accessing the pages of admin module of the website/portal; also, the main website. So that identified attackers can be blocked.</li><li>The admin module, uploader module should be in separate folder so that HTTPS can be configured on the functionality that requires login action to be done.</li><li>Unauthorized access should be restricted and only authorized users with valid login-ID and password should be allowed to access the legitimate features i.e., access to data file, module, screen, data table, record, field, etc. If required, second level password may be provided for accessing certain features/ screens/ transactions.</li><li>To maintain information security during transaction the developed system should support both HTTP and HTTPS, all internal data communication shall be done through encrypted mode using latest version of TLS (Transport Layer Security)/ SSL (Secure Socket Layer).</li><li>The system should have a capability to assign activities to roles, and map roles to users and provide role-based access to users.</li><li>Although most of the information in the system will be available for public, but certain information will only be restricted to certain departments and officials of TNUHDB. Appropriate role-based security should be provided so as to who will and how will they have the right to view and handle the limited information about the digitized documents. Should give specific rights to TNUHDB officers or employees in each position to manage access right to such information. If anyone handles a File / document in the system, notice should go to the superior officer of that post/department and the system should also generate information about which File / document has been viewed or downloaded by any officer / employee and its daily / weekly report will be received by the senior officer of the concerned TNUHDB department. User ID and password related to officer / employee will be linked to their official mobile number (as per information in the official records). While searching for limited information (which is not available to everyone) in the system, the OTP (One Time Password) based security arrangements should be made in the proposed solution (including web and mobile application) so that the relevant documents / files can be viewed only after getting authenticated with OTP.</li><li>The system should notify security/ system administrator regarding unauthorized access or attempt to access and record in a log with reporting mechanism.</li><li>The system should have the feature of automatic log-off if there is no user activity for specified time.</li><li>The application should have sufficient validation checks at GUI/ presentation layer for validating the data formats.</li><li>The application should provide safeguards to prevent damage to data from user errors, simultaneous updates, module unavailability or system failures.</li><li>The system data must be kept on storage media with high tolerance of failure/ accident/ natural calamity.</li><li>The application must have integrated security/ monitoring features with the following:<ol><li>Definition of roles and users</li></ol></li></ol><ol><li><ol><li>Define role-wise add/ edit/ view/ delete rights for each entry form/ report in all modules</li><li>Digital time and user stamping of each transaction</li><li>Online monitoring of the user activities using user activity logs</li></ol></li><li><strong>Anti-Virus and Anti-Spam Services:</strong> Anti-Virus and Anti-Spam shall be deployed to keep the servers and application secure from the attack of virus, spyware, Trojans, and spam. This shall also act as a centralized system for updating the virus definitions on the systems across offices of TNUHDB.</li><li><strong>Virtual Firewall:</strong> Instance Level and Subnet Level and Web Application Firewall:</li></ol><ol><li>System shall have capability to protect network subnets with access controls that provides an optional layer of security that provides a stateless firewall for controlling traffic in and out of a subnet.</li><li>System shall have capability to segregate public subnet and private subnet.</li><li>System shall have capability to configure route tables that define which subnets can route external traffic over backend VPN or site-site connections, VPC peering connections, Internet connections, or even specific virtual machine instances.</li><li>System shall prevent packet sniffing: Virtual instances should be designed to prevent other instances running in promiscuous mode to receive or &ldquo;sniff&rdquo; traffic that is intended for a different virtual instance. Even if tenants configure interfaces into promiscuous mode, the hypervisor should not deliver any traffic to them that is not addressed to them.</li><li>System shall prevent IP Spoofing: The DC and Cloud DR service should not permit an instance to send traffic with a source IP or MAC address other than its own.</li></ol><ol><li><strong>Anti-Malware / HIPS (Host Intrusion Prevention System) and NIPS (Network Intrusion Prevention System):</strong></li></ol><ol><li>Firewall with Intrusion Prevention System shall be configured and deployed to stop intrusion and other threats coming from the network before it enters the system.</li><li>The solution shall be able to deliver Antimalware, Firewall, HIPS, Integrity Monitoring features, Log Inspection and Application control through an agent.</li><li>System should be capable of performing recommendations scan and able to monitor critical OS and application elements (files, directories, and registry keys) to detect suspicious behaviour, such as modifications, or changes in ownership or permissions.</li><li>The solution should deliver virtual patching updates and HIPS should work in detect only mode and prevent mode.</li><li>Solution should support creation of custom packet inspection rule, protect against fragmented attacks, and should allow to block based on thresholds. Packet Inspection should protect operating systems and web applications etc. against attacks such as SQL injections and cross-site scripting.</li><li>Detailed events data to provide valuable information, including the source of the attack, the time, and what the potential intruder was attempting to exploit, shall be logged.</li><li>Solution should provide vulnerability scanning to automate provisioning and de-provisioning of HIPS rules and should provide recommendation scanning against existing vulnerabilities.</li><li>Solution should support virtual patching both known and unknown vulnerabilities and Virtual Patching should be achieved by using a high-performance packet inspection.</li><li>Firewall rules should filter traffic based on source and destination IP address, port, MAC address, etc. and should detect reconnaissance activities such as port scans, Computer OS fingerprinting, SYNFIN SCAN, XMAS Scan etc.</li></ol><ol><li><strong>DDoS Protection:</strong> Managed DDoS protection service that defends against most common, frequently occurring network and transport layer DDoS attacks that target web site or applications. When used with Content Delivery Network and global DNS service, should provide comprehensive availability protection against all known infrastructure (Layer 3 and 4) attacks. Should provide always-on detection and automatic inline mitigations, minimize application downtime and latency.</li><li><strong>Identity and Access Management:</strong> Securely control users&#39; access to DC and Cloud DR services using a range of security credentials including passwords and key pairs. Create and manage users and groups, and grant or deny access to compute, storage and network. A dedicated Privilege access management tool shall be part of proposed data security solution for the purpose of privilege access management, password management, session management &amp; Log management.</li><li><strong>Managed Threat Detection Service:</strong> Continuously monitor for malicious or unauthorized behaviour to help you protect your accounts and workloads. It should monitor for activity such as unusual API calls or potentially unauthorized deployments that indicate a possible account compromise. The service should also detect potentially compromised instances or reconnaissance by attackers.</li><li>There should be 3 levels of Security Considerations as described below:<ol><li>Application Level Security:<ol><li>User authentication</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>User authorization i.e., role-based access to services, transactions, and data</li><li>Digital Certificate to be used for signing the documents</li><li>Secure storage of user credentials</li><li>Comprehensive logging and audit trail of sessions and transactions</li></ol></li><li>Network/ Transport Level Security:<ol><li>Network Link Encryption (IPSEC)</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>Encrypted HTTP session using SSL (HTTPS)</li></ol></li><li>Server Level Security:<ol><li>Firewall to filter unauthorized sessions/traffic</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>Intrusion Prevention System to detect/ prevent unauthorized activities/ sessions</li><li>Server &ndash;to-server communication encryption</li><li>Secured/ encrypted storage of data/ data elements in Database and DB Backups</li></ol></li></ol></li><li><strong>Two Factor Authentication</strong><ol><li>The solution (mobile and web) should support the Two Factor Authentication both OTP (One Time Password)/soft tokens and PKI authentication technologies.</li><li>The solution should have the capability to be deployed in such a way that the user&rsquo;s login experience should remain unchanged &ndash; there should be no user training required.</li><li>The solution should prevent against all Man-in-the-Middle including advanced phishing, pharming, Man-in-the-Browser, Key logger, and Mouse click logger attacks.</li><li>For the hardware/software token management system, all activities at admin console should have an audit trail of all logons attempts and operations. Confidential logs should be tampering proof. The tools should be provided to check the integrity of logs.</li><li>The solution should not store user credentials in any form at the server like passwords, hash of passwords, any pre shared secret etc. In other words, there should be only copy of the user credential which should reside only with the user.<ol><li>System Control and Audit</li></ol></li></ol></li></ol><ol><li>The system should maintain all the instances, audit trails, audit logs and transaction logs (what, when, who has changed).</li><li>The application shall log all the actions done by individual users with username, date time stamp and the administrator shall be able to generate detailed audit logs and history of the process instance.</li><li>It should enable availability of user wise online audit trails/ logs which should be archived based on user, date, time etc. as part of audit records keeping.</li><li>All the edited and deleted (if any) records should be traceable and copy of all records should be kept in the system and which should be available with MIS reporting of the same.<ol><li><ol><li>Data Backup/ Data Archival/ Restore</li></ol></li></ol></li></ol><ol><li>The SI shall prepare a business continuity plan for ensuring uninterrupted services of the solution. In case of server failure, system should support auto-switching of failover to another available/ backup server.</li><li>The system should be able to archive data, based on user specified parameters (i.e., date range) and restore archival data for online use whenever required.</li><li>Backup and recovery of all the system software, application software, database, etc. as per GoI policy (Guidelines for Government Departments for Adoption/ Procurement of Cloud Services).</li><li>The system should provide features to schedule backup/ restore operations. The SI should ensure that activity such as proper Data Backup, Data Restoration, and Data Synchronization at Disaster Recovery site are tested and implemented properly as per the standard norms.</li><li>The system should produce a report for each backup/ restore activity.</li><li>The system should support direct backup of data from one machine to another/ from server to back tapes/ CDs/ Storage Area Network etc.</li><li>The system should have provision to keep data on storage media with high tolerance of failure.</li><li>The system should allow recovery of data in case of hardware/ software failure and data corruption. It should be able to perform recovery to a point of time, to known backup database.</li><li>For backup data, highly available durable Storage shall be offered with minimum two copies of the data in the Primary Site.&nbsp;</li><li>System shall offer users the ability to increase the size of an existing block storage volume without having to provision a new volume and copy/move the data.</li><li>System shall support complete eradication of data such that it is no longer readable or accessible by unauthorized users and/or third parties.</li><li>System shall offer server-side encryption of data &lsquo;at-rest&rsquo;, i.e., data stored on volumes and snapshots.</li><li>The SI shall prepare a data archival, retention, disposal, and backup policy in consultation with TNUHDB officials.<ol><li><ol><li>Database</li></ol></li></ol></li></ol><ol><li>The database technology should adhere to ANSI standards.</li><li>Database should be able to compress structured data and unstructured data such as documents, images, and multimedia.&nbsp;</li><li>Database should support data mining techniques and allow seamless integration with a Digitalized data warehouse. The data mining techniques like classification, clustering, regression, and association rule learning should be supported by the database to support data mining applications developed in the application layer.</li><li>Database should support continuous Log replication between primary node and secondary node in Synchronous or Asynchronous mode.</li><li>The solution should use appropriate storage options for storing unstructured data such as documents, images, and multimedia instead of storing it in NoSQL system.</li><li>Database should provide high availability and disaster recovery using cost effective option of automatically synchronizing the transaction logs to disaster site, which in case of fail over the other node provides the availability of all data.</li><li>The solution should provide controls for database security and monitoring.</li><li>The solution should have database health monitoring components which can ensure application availability and performance.</li><li>The SI while implementing a data base solution, shall carry out all the related tasks, including the following:<ol><li>Design and develop the data model to fulfil the functional requirements of TNUHDB and provide a comprehensive view of the entire digitalized records and other materials of TNUHDB departments.</li></ol></li></ol><ol><li><ol><li>Ensure the data integrity &amp; consistency is always maintained.</li><li>Ensure storage of documents and images</li></ol></li><li>Robustness: Should assure high availability of data with regular backup</li></ol><p>&nbsp;</p><ol><li><ol><li><ol><li>Enterprise Monitoring System (EMS)</li></ol></li></ol></li><li>SI shall supply, deploy &amp; configure EMS tools to TNUHDB for Project Management &amp; Monitoring during implementation and operation &amp; maintenance period</li><li>SI shall be responsible for providing tools, in line with industry standards for Evaluation and SLA Monitoring during O&amp;M period. Such tools should be capable of monitoring the performance of the SI &amp; provide automated consolidated SLA reports for all the SLAs as mentioned in this RFP including real time status of various service levels achieved</li><li>SI should make available the SLA report through a centralized web access / dashboard the access for this to be given to at least 5 users of TNUHDB. The dashboards to be made for two levels (Principal Secretary / Secretary level as well as operational dashboard) for TNUHDB MIS team</li><li>The implemented EMS solution to help TNUHDB in data driven decision making. Once the tool is implemented the SI shall also get the implementation certified from the respective OEM confirming that the tool has been correctly implemented. SI shall also provide 2 days in-depth training to at least 20 users of TNUHDB on usage and operations of EMS solution</li><li>The EMS should be able to support the proposed hardware and software components at Cloud DC and DR over the tenure of the contract. The system should be capable of providing early warning signals to TNUHDB on the solution performance issues, and future infrastructure capacity augmentation.</li><li>SI is expected to provide and implement the EMS encompassing the following functions:<ol><li>Configuration Management</li><li>Fault Management</li><li>Incident, Problem and Change Management</li><li>Asset Management</li><li>Remote Control</li><li>SLA management and monitoring</li><li>Performance management</li><li>Monitoring Backup and Management</li><li>Event Management</li><li>Server, storage, and other infrastructure management</li><li>Network Link Monitoring</li><li>Other modules as required by SI to meet the requirements of this RFP</li></ol></li><li>Also, the new system should be extended to any new device which shall be added in future to fulfil the project requirements.</li><li>SI shall also provide the Login of EMS to TNUHDB, so that key members of the Project Management Committee (PMC) can monitor the SLA compliances.</li></ol><p>Application Performance Monitoring</p><ol><li>The proposed solution must be able to perform infrastructure aware application triage, i.e., pinpoint network issues causing application degradation.</li><li>The proposed solution must determine if the root cause of performance issues is inside the monitored application, in connected back-end systems or at the network layer from a single console view</li><li>The proposed solution must proactively monitor 100% of real user transactions; detect failed transactions; gather evidence necessary for triage and diagnosis of problems that affect user experiences and prevent completion of critical business processes</li><li>The proposed solution must provide complete end-to-end transaction visibility by monitoring at a transactional level and without deploying any software at end user desktop.</li><li>The proposed solution must provide a single view that shows entire end-to-end real user transaction and breaks down times spent within the application components, SQL statements, backend systems and external 3rd party systems</li><li>The proposed solution must be able to provide root-cause probability graphs for performance problems showing the most probable root-cause area within application infrastructure.</li><li>The proposed solution must provide a real-time application topology map to triage and quickly pinpoint the component causing a performance bottleneck in the end-to-end transaction flow.</li><li>The proposed solution must gather available performance indicator metrics from all within real-time production environments and real user transactions 24x7 with minimal overhead on monitored applications without sampling.</li><li>The proposed solution must provide for easy dynamic instrumentation of application code, i.e., be able to enhance out of the box monitoring with extra monitoring definitions without having to restart application or JVM/ .NET Worker Process.</li><li>The proposed solution must be able to detect production Memory Leaks from mishandled Java Collections and Sets and isolate exact component creating leaking Collection or Set (or .NET Memory Leaks within the CLR).</li><li>The proposed solution must allow monitoring granularity of no more than 15 seconds for all transactions.</li><li>The proposed solution must report of response times of Java/.Net methods based on simple method parameters (Strings, Integers etc.).</li><li>The proposed solution must provide real-time monitoring of resource utilization like memory usage, DB connection pools and Threads.</li><li>The proposed solution must be able to identify socket and file Input / Output activity from the application.</li><li>As a means of detecting poorly performing SQL, the solution must be able to proactively record all SQL calls, and report on the slow performing ones. The SQL measurements must be made from within the monitored application &ndash; not using an external database agent.</li><li>The proposed solution must monitor performance of all stored procedures being executed from within the Java/.NET application.</li><li>The solution should have provision for automatic transaction discovery, for example by setting up some bounding parameters to describe transactions like the web site, the language, and parameters (such as post, query, and cookies).</li><li>The proposed solution must provide ability to monitor performance of applications up to the method level of execution (Java/.Net method) 24x7 in production environments with negligible impact on monitored application.</li><li>The proposed solution must be able to report on any application errors occurred while executing application functionalities and pinpoint exact place of error within transaction call stack.</li><li>The proposed solution must provide for at least 2 levels of thresholds which can be set on alerts and provide for actions so that alerts can automatically trigger other processes when thresholds are breached. The proposed solution must not necessitate any changes to application source code.</li><li>The proposed solution must proactively identify any thread usage problems within applications and identify stalled (stuck) threads.</li><li>The proposed solution should allow query statement normalization by aggregating hundreds of related query statements into a single performance metric using regular expressions and pattern matching.</li><li>The proposed solution must monitor individual web service and performance transaction debugging for web services. The proposed solution must also monitor web services across multiple processes (cross JVM tracing)</li><li>The proposed solution should eliminate problem resolution guesswork by using its performance metrics to automatically identify complex emerging performance issues, enabling triage and diagnosis teams to solve problems faster and understand their environments better.</li></ol><p>End-User Experience Management System</p><ol><li>The solution should act as a passive listener on the network thus inducing zero overhead on the network and application layer.</li><li>The proposed system must be able to detect user impacting defects and anomalies and reports them in real-time:<ol><li>Slow Response Time</li><li>Fast Response time</li><li>Low Throughput</li><li>Partial Response</li></ol></li><li>The proposed system must be able to provide the ability to create user groups based on application criteria or location and link user ids to usernames and user groups.</li><li>The proposed system must be able to provide user usage analysis and show how user&#39;s success rate, average time and transaction count has changed over a specific period such as current week versus previous week.</li><li>The proposed system must be able to provide the ability to detect and alert when users experience HTTP error codes such as 404 errors or errors coming from the web application.</li><li>The proposed system must be able to provide root-cause probability graphs for performance problems showing the most probable root-cause area within application infrastructure.</li><li>The proposed solution should be capable of identifying the problem domain (browser, network or application) thereby it should monitor the browser side metrics and provide reports in real time for:<ol><li>DOM Construction Time (ms)</li><li>Page Load Time (ms)</li><li>Previous page unload time (ms)</li><li>Browser Render Time (ms)</li><li>Page Roundtrip Time (ms)</li><li>Responses Per Interval (browser activity)</li></ol></li><li>The proposed solution should be capable of collecting Browser metrics without the need to install any agents on the end user desktops, by way of dynamic java script injection.</li><li>The proposed solution must be able to provide real time transaction health metrics and end user experience quality metrics anytime, anywhere for the business executives.</li><li>The proposed solution must be able to provide the business executives the flexibility to select, organize and monitor real time business indicators with the help of an interactive user interface</li><li>The proposed solution must be able to work consistently on a variety of mobile devices such as iPhone, iPad, Android phones etc.</li><li>The proposed solution must be able to provide flexibility by enabling addition of annotations to business indicators to enhance clarity and context around its behaviour enabling better information sharing and collaboration.</li><li>The proposed solution must be able to maintain centralized control of data and security of the data that is viewed on the smart devices like iPhone, iPad etc.</li></ol><p>General Monitoring Platform Requirements</p><ol><li>The Monitoring Solution should provide End to End Monitoring of Complete IT Infrastructure including:<ol><li>Server Monitoring</li><li>Application Monitoring</li><li>End User Experience Monitoring</li><li>Database Monitoring</li><li>Virtualization Platform Monitoring</li><li>Storage Monitoring</li></ol></li><li>The proposed solution should be capable to provide hybrid monitoring architecture through agent/agentless approach</li><li>The Platform must support Event Correlation Alerting (ECA) integrations to trigger automated creation of incidents, problems, and changes based upon alarms and events correlation.</li><li>The proposed monitoring solution should provide capability to integrate with hardware monitoring platforms.</li><li>The proposed monitoring solution should possess the inherent capability to leverage API&rsquo;s and SDKs to enable integration and monitoring.</li><li>The proposed monitoring solution should have capability to configure actions based rules for set of pre-defined alarms/alerts enabling automation of set tasks.</li><li>The Platform must include an event correlation automatically fed with events originating from managed elements, monitoring tools or data sources external to the platform. This correlation must perform:</li></ol><ol><li>Event filtering</li><li>Event aggregation</li><li>Event masking</li></ol><ol><li>The Reporting Portal should be Completely web based with ability to define Accounts and Users for Role Relevant Views</li><li>The proposed solution should provide the ability to create custom dashboards with ability to aggregate metrics from all monitored devices and should provide drill down functionality to other defined dashboards within the tool.</li><li>The proposed solution should provide ability to monitor and generate alarms for set threshold for pre-defined Service level agreement for monitored metrics. The proposed monitoring solution should provide functionality to sync with online library for latest updates and support for new functionalities.</li></ol><p>Server Monitoring Requirements</p><ol><li>The Solution should monitor heterogeneous operating systems for both physical and virtual environments OS including but not limited to Windows 32/64 bit, All Major Flavours of Linux, Solaris, Unix etc.</li><li>The solution should be able to monitor non-SNMP devices (e.g., using WMI, Telnet, SSH etc.)</li><li>The solution should monitor all server files and directories.</li><li>The solution should monitor File System Mounts for presence / absence / functionality</li><li>The solution should generate alarms based on what is currently mounted compared with what is configured on a defined compliant system.</li><li>The solution should support monitoring any ASCII based log files.</li><li>The solution should support monitoring of Windows Event Logs and provide correlation of events for these.</li><li>The solution should support monitoring of performance counters in Windows/Linux environment.</li><li>The solution should support monitoring of services/processes in a Windows / Linux environment.</li><li>Processes monitoring should also have ability to track CPU and Memory consumption of the monitored process for alerting and reporting/trending purpose.</li><li>The solution should report on services not in the expected state and optionally start or stop them.</li><li>The solution should support the monitoring of processes &amp; taking automated actions</li><li>The solution should support monitoring new processes that come up on a server.</li><li>The solution should support monitoring CPU performance over defined user defined time periods of time</li><li>The solution should support monitoring Availability and performance of memory, including upper and lower thresholds and types of usage</li><li>The solution should support monitoring Local and Attached Disk capacity and provide delta change in used capacity</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Alerts &amp; Log Messages, including regular expression matching.</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Performance counters for IO</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Running services and in-progress jobs</li><li>The solution must monitor the availability, health, and performance of Microsoft Distributed File Services namespace and replication.</li><li>The Solution should Monitor automatic reboots of servers</li><li>The Solution should support monitoring new processes that come up on a server</li></ol><p>Network Monitoring Requirements</p><ol><li>The Solution should provide capability to monitor any device based on SNMP v1, v2c &amp; 3</li><li>The Solution should monitor bandwidth utilization.</li><li>The Solution should monitor utilizations by type of traffic.</li><li>The Solution must be capable of monitoring the availability, health, and performance of core networking devices including but not limited to CPU, memory, temperature</li><li>The Solution should have the ability to issues pings to check on availability of ports, devices.</li><li>The Ping Monitoring should also support collection of packet loss, Latency and Jitters during ICMP Ping Checks</li><li>The Port Check for IP Services monitoring should also provide mechanism to define new services and ability to send custom commands during port check mechanism.</li><li>The Solution should have the ability to receive SNMP traps and syslog.</li><li>The Solution should automatically collect and store historical data so users can view and understand network performance trends.</li><li>The solution should be capable of monitoring network delay/latency</li><li>The solution should be capable of monitoring delay variation</li><li>The solution should be capable of monitoring packet loss, Packet QOS, Packet Errors on one or more ports</li><li>The solution should allow users to access network availability and performance reports via the web or have those delivered via e-mail.</li><li>The solution should support auto-discovery of network devices</li><li>The solution should have the ability to schedule regular rediscovery of subnets.</li><li>The solution should provide the ability to visually represent LAN/WAN links) with displays of related real-time performance data including utilizations.</li><li>The system should provide discovery of heterogeneous physical network devices like Layer-2 &amp; Layer-3 switches, Routers and other IP devices and do mapping of LAN &amp; WAN connectivity.</li><li>The solution should provide capability to mask the default port speed for accurate % port utilization reporting</li><li>The System shall support monitoring of Syslog</li><li>The solution should provide capability to add an IP device or IP Range or IP subnet with functionality supporting multiple SNMP strings.</li><li>The solution should provide capability to add devices from word or excel file by drag and drop functionality and auto configure based on pre-defined settings.</li><li>The solution should allow easy configuration of polling frequency till per second scenario.</li><li>It refers to how much digital information we can send or receive across a connection in a certain amount of time.</li></ol><p>Database monitoring requirements</p><ol><li>The solution should monitor multiple database servers and multiple versions of each server including Oracle/ SQL Server/ Informix/ DB2/Sybase/MySQL/NoSQL and others including database proposed by SI.</li><li>The Solution should Provide SQL Response Time for Monitoring Custom Queries</li><li>The Solution should provide response time Monitoring for custom queries through JDBC Mechanism to allow monitoring unsupported databases</li><li>Database Space Monitoring for both file group and transaction log (Warning threshold, Critical threshold as well as file group/log full)</li><li>Performance monitoring - capture of DB Engine related performance counters as well as threshold alerting</li><li>The solution must support SQL Agent monitoring - failed jobs, long running jobs</li><li>The solution must support Database Health and Settings - Check database status (offline, suspect), Check database options (auto grow, auto shrink, auto close etc.)</li><li>The solution must support monitoring of Replication, DB Mirroring and Log shipping if applicable</li><li>The solution must be able to report &amp; check for last recent Full database backup and last recent Transaction Log backup</li><li>The solution must monitor for Blocking (exceeding duration) and Deadlocks</li><li>The solution must be able to run PowerShell, VBScript, cmd and VBScripts to perform tests on the database and have the results put into the solution as performance data and or alarms</li><li>Inclusion of SQL statements within the Solution should be a standard &ldquo;easy-to-use&rdquo; function achieved without programmatic intervention.</li><li>The solution should support auto-discovery of database instances.</li><li>The solution should support the creation and management of reusable test templates that contain a specific pre-defined set of database checkpoints/measurements.</li><li>The solution should support the use of schedules and time filters for database monitoring.</li></ol><p>Virtualization Monitoring Requirements</p><ol><li>The solution should provide support for leading virtualization platform like VMware, Hyper-V, Zen, IBM PowerVM, KVM etc.</li><li>The solution should support monitoring of virtualized environment through management interface.</li><li>The solution should provide capability to monitor events generated by the hypervisor to generate alarms and alerting functionality</li><li>The solution should provide capability to create monitoring template and auto configure any newly detected virtual machine.</li><li>The solution should provide a configurable interface to view performance metrics related to virtualization infrastructure</li><li>The solution should provide capability to monitor the availability to Web APIs of application.</li><li>The proposed solution should be integrated with centralised monitoring tool to enable aggregation of alarms and alerts.</li><li>The proposed solution should allow reporting through unified reporting console along with other infrastructure devices being monitored.</li></ol><p>Storage Monitoring Requirements</p><ol><li>The proposed solution should be able to monitor leading enterprise storages through standard interfaces</li><li>The proposed solution should be able to monitor In depth metrics and performance data for supported storage platforms</li><li>The proposed solution should automatically discover storage configuration and auto-applies monitoring by template</li><li>The proposed tool should be able to monitor other storage devices through SNMP</li></ol><p>SLA monitoring requirements</p><ol><li>General: The solution most support Service Level Agreements Lifecycle Management including Version Control, Status Control, Effectively and audit Trail.</li><li>General: The solution must provide a flexible framework for collecting and managing service level templates including Service Definition, Service Level Metrics, Penalties, and other performance indicators.</li><li>Service Delivery: The solution must have the ability to define and calculate key performance indicators from an End-to-End Business Service delivery perspective.</li><li>Contract Management: The solution must support dependencies between supplier contracts and internal or external contracts.</li><li>Bonus &amp; Penalty: Support for Defining and Calculating service Credit and Penalty based on clauses in SLAs. Support for Defining and Calculating service Bonuses based on clauses in SLAs</li><li>Alerts: The solution must support delivery mechanisms to indicate/notify whether SLA targets are being achieved or violated.</li><li>Business Impact Analysis: The solution must make it possible to find the underlying events that cause the service level contract to fail.</li><li>Dynamic Calculations: The solution supports dynamic service level targets to reflect obligations importance and priority over time.</li><li>Audit Trails: Full electronic audit trails available for both system and user transactions.</li><li>Reporting: Report module and SLA Management module must be integrated to provide ease-of reports configuration and execution.</li><li>ITIL: The solution supports ITIL standards.<ol><li><ol><li>Operations</li></ol></li></ol></li></ol><ol><li>The application should have inbuilt analytics capability and able to generate user friendly MIS reports, Graphical reports etc. in customized and standard form. The following types of reports, but not limited to, are required to be generated from this sub module. The report should be generated in standard formats like MS Word, MS Excel, Adobe Acrobat files etc.:</li></ol><ol><li>Fixed Format Reports: Application should have robust reporting capability, and should be able to generate in multiple formats including XML, MS Word, MS Excel, Adobe Acrobat files etc. The output should be delivered through email or should be printed.</li><li>Ad-hoc Reports: Application should provide ad hoc query and analysis capability so that business users could create new analyses from scratch or modify existing analyses.</li><li>Tools and utilities should be provided to facilitate design layout using MS Word, MS Excel, Adobe Acrobat etc.</li><li>System shall allow user to generate MIS reports/previous trends/graphics etc. as per the business process requirements. They should be customizable as per&nbsp;user requirements.</li></ol><ol><li>The application should provide dynamic dashboards to pre-defined users. The layout and content of the dashboard would be based on the user role/ category/ type etc.</li><li>The application shall periodically and automatically save the data entered by the user into the system during a live session and shall make the data available to the user as intermediate save even after expiry of the session. System should prompt the user regarding availability of intermediate/ draft data and ask for the permission to save or discard this data.</li><li>The application should provide functionality to users in generating customized reports on their own without having knowledge about technical programming.</li><li>Any document or report should be previewed before printing.<ol><li><ol><li>Stages of Application Development</li></ol></li></ol></li></ol><p>Each phase of application development and implementation for TNUHDB Digitalization systems need to adhere the below lifecycle:</p><p><strong><em>Project Initiation</em></strong></p><ol><li>The SI shall prepare and submit a project inception report, which will serve as the foundation document for all activities related to the project. The inception report should at least have the following.<ol><li>Description of SI&rsquo;s organization with their proposed staffing, roles, and responsibilities</li><li>Overall project organization and communication structure</li><li>Project monitoring and management tools to be used for successful monitoring &amp; management of the project</li><li>Security and confidentiality practices in accordance with industry best practices to ensure the security and confidentiality of sensitive information, documents, records, software, data, reports, deliverables etc. handled during the entire project.</li><li>Succession planning with requisite checks, handover in case of employee replacement.</li><li>Project plans giving schedule wise details of various tasks, and subtasks, task completion timelines, dependencies, deliverables, milestones, resource deployment, meetings, reviews, and information required from TNUHDB.</li><li>project risks that the SI anticipates and plans to propose towards the risk mitigation.</li></ol></li><li>The SI will be responsible for preparation of detailed project plan. The plan shall address at the minimum the following:<ol><li>Define an organized set of activities for the project and identify the interdependence between them.</li><li>Resource planning and loading for each phase/activity. This must also indicate where each resource would be based during that phase, i.e., onsite at the TNUHDB office or off site at SI premises.</li><li>Establish and measure resource assignments and responsibilities</li><li>Highlight the milestones and associated risks</li><li>Communicate the project plan to stakeholders with meaningful reports.</li><li>Measure project deadlines and performance objectives.</li><li>Project Progress Reporting. During the implementation of the project, the SI should present weekly reports. This report will be presented in the Project Working Group (PWG) meeting to TNUHDB. The report should contain at the minimum the undermentioned:<ol><li>Results accomplished during the period (weekly)</li><li>Cumulative deviations from the schedule date as specified in the finalized Project Plan</li><li>Corrective actions to be taken to return to planned schedule of progress</li><li>Plan for the next week</li><li>Proposed revision to planned schedule provided such revision is necessitated by reasons beyond the control of SI</li><li>Support needed</li><li>Highlights/lowlights</li><li>Issues/Concerns</li><li>Risks/Show stoppers along with mitigation</li><li>Proposed changes if any for consideration of Change Advisory Board</li></ol></li></ol></li><li>Identify the activities that require the participation of client personnel (including TNUHDB, the Program Management Unit etc.) and communicate their time requirements and schedule early enough to ensure their full participation at the required time.</li><li>The SI shall be responsible for providing a web-based Project Management Tool for the department and PMC for reporting and monitoring the progress of the project.</li><li>The SI shall be responsible for providing an online repository tool for maintaining project documentation with version control.</li></ol><p><strong>System Requirement Study </strong></p><p>The SI must perform the detailed assessment of the business requirements and IT Solution requirements at TNUHDB&rsquo;s Offices as mentioned in this RFP.</p><p>Based on the understanding and its own individual assessment, SI shall develop &amp; finalize the System Requirement Specifications (SRS) in consultation with TNUHDB and its representatives. While doing so, SI at least is expected to do following:</p><ol><li>In case of any change in indicative business process and software requirement as mentioned into &ldquo;Functional Requirements&rdquo; of this section will provide the modified business processes to the SI. SI shall study and revalidate the same with TNUHDB at the time of construction and submit as an exhaustive FRS document.</li><li>SI shall translate all the requirements as captured in the FRS document into SRS.</li><li>SI shall develop and follow standardized template for requirements capturing and system documentation.</li><li>SI must maintain traceability matrix from RFP to FRS to SRS stage for the entire implementation.</li><li>SI must get the sign off from PIC formed by TNUHDB.</li><li>For all the discussion with TNUHDB team, SI shall be required to be present at TNUHDB office with the requisite team members.</li></ol><p><strong>Solution Design </strong></p><p>The SI shall build the solution as per the indicative solution architecture. The solution proposed by SI should comply with the solution architecture requirements as mentioned therein.</p><p><strong>Development</strong></p><p>The SI shall carefully consider the scope of work and provide a solution that best meets the TNUHDB Digitalization System&#39;s requirements. The development of the application software will follow the procedure mentioned below:</p><ol><li>Software Products (Configuration and Customization): In case SI proposes software products the following need to be adhered:<ol><li>SI will be responsible for supplying the application and licenses of related software products and installing the same to meet TNUHDB Digitalization System&#39;s requirements.</li><li>SI shall have provision for procurement of licenses that are perpetual and that should cater to unlimited users. The source code of licenses should be handed over to TNUHDB after contract period.</li><li>Source code access to be handed over to TNUHDB</li></ol></li><li>Bespoke (Custom Developments):<ol><li>The successful SI shall identify, design, and develop components/functionalities that are required to address the TNUHDB requirements mentioned in this RFP.</li></ol></li><li>In both cases of Software Product and/or Bespoke development, SI shall also supply any other tools &amp; accessories required to make the integrated solution complete as per requirements. For the integrated solution, the SI shall supply:<ol><li>Software &amp; licenses.</li><li>Supply tools, accessories, documentation and provide a list of the same. Tools and accessories shall be part of the solution.</li><li>System Documentation: System Documentation both in hard copy and soft copy to be supplied along with licenses and shall include but not limited to following. Documentation to be maintained, updated, and submitted to TNUHDB regularly:<ol><li>Functional Requirement Specification (FRS)</li><li>High level design of whole system</li><li>Low Level design for whole system / Module design level</li><li>System requirements Specifications (SRS)</li><li>Any other explanatory notes about system</li><li>Traceability matrix</li><li>Compilation environment</li><li>Technical and product related manuals</li><li>Installation guides</li><li>User manuals</li><li>Business process guides</li><li>Program flow descriptions</li><li>Data model descriptions</li><li>Sample reports</li><li>Screen formats</li><li>Frequently asked questions (FAQ) guides</li><li>System administrator manuals</li><li>Toolkit guides and troubleshooting guides</li><li>Other documents as prescribed by TNUHDB</li><li>Quality assurance procedures</li><li>Change management histories</li><li>Version control data</li><li>SOPs, procedures, policies, processes, etc. developed for TNUHDB</li><li>Programs:<ol><li>Entire source codes</li><li>All programs must have explanatory notes for understanding</li><li>Version control mechanism</li><li>All old versions to be maintained</li></ol></li><li>Test Environment:<ol><li>Detailed Test methodology document</li><li>Module level testing</li><li>Overall System Testing</li><li>Acceptance test cases</li></ol></li><li>Any other documentation required for usage of implemented solution</li></ol></li></ol></li></ol><p>Note: These documents need to be updated after each phase of project and to be maintained updated during entire project duration. The entire documentation will be the property of TNUHDB.</p><p><strong>Testing</strong></p><p>The SI shall provide the testing strategy including traceability matrix, test cases and shall conduct the testing of various components of the software developed/customized and the solution. The testing should be comprehensive and should be done at each stage of development and implementation. SI should plan to establish an UAT environment at TNUHDB Board office under the overall control of TNUHDB. Also, System Integrator should&nbsp;provide support to set up a development environment in the TNUHDB head office itself. Preparation and submission of Testing Plans must include system testing, Defect regression testing, release regression testing, Risks and Mitigation, Test environment, tools, defect management, test phase transition criteria, test schedule and deliverables. During testing phase, it expected use industry standard tools. The Application testing mechanism shall be adopted like, Alpha Testing, Automated Testing, Black Box Testing, White Box Testing, Compatibility Testing, Functional Testing, Integration Testing, Load Testing, Performance testing, Regression Testing, Stress Testing, Acceptance Testing, Security &amp;amp, Controls Testing, etc.,</p><p>Bug Tracking: A Bug tracking software is an essential tool for managing the process of finding, tracking and fixing bug. Not only does it ensure that to deliver high -quality near-perfect application, but it also enhances the productivity of the development team throughput the application development process. A good bug tracking tool&nbsp;gives an overview of all identified errors so that nothing slips through the cracks. Reactive bug tracking also ensures that issues identified during use are promptly fixed to ensure minimal impact on product operation. A bug tracking system is required to find, fix bugs and other related issues to reduce cost of development and save time. Bug tracking system/tool should track problems and analyse efforts taken by team members to fix a bug or an issue. A bug tracking system/ tool can prioritize bugs and assign issues. Also, helps to spot repetitive problems and concentrate on important issues</p><p>The development team will be able to focus on high priority bugs rather than wasting time on smaller issues A bug tracking system/ tool should provide better communication through chat interfaces and email notifications. This reduces the communication gap and communicate to the right person to test / fix bug on time A bug tracking system should keep a record of the bug issues that are detected, who fixed them, and how long it took to fix a particular issue.</p><p><strong>Project Go- Live Pre-Requisites &amp; Go-Live</strong></p><ol><li>SI shall prepare and agree with TNUHDB, the detailed plan for Go-Live (in-line with TNUHDB&rsquo;s implementation plan as mentioned in RFP).</li><li>The SI shall define and agree with TNUHDB, the criteria for Go-Live and the timelines for the same.</li><li>The SI shall ensure that all the data migration is done from existing TNUHDB applications.</li><li>The SI shall submit signed-off UAT report (issue closure report) ensuring all issues raised during UAT are being resolved prior to Go-Live.</li><li>The SI shall ensure that Go &ndash;Live criteria as mentioned in User acceptance testing of TNUHDB Digitalization system is met and SI needs to take approval from TNUHDB team on the same. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li><li>Go-live of the application shall be done as per the finalized and agreed upon Go-Live plan.</li><li>Once the System has gone live for each phase of application development the above UAT process needs to be followed.</li><li>The SI shall furnish the Go Live sign off document issued by the TNUHDB&rsquo;s Project Implementation Committee (PIC).</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure III - Track 2: Data digitalization </strong></p><p>This section provides the high-level requirements for digitalization of legacy documents and other material of TNUHDB.</p><p>There are approximately 55Lakh+ of documents that needs to be digitalized.</p><p>The location of digitalization of document shall be discussed during the project inception phase. There are confidential documents and videos which are not in public domain shall have to be digitalize at TNUHDB premise. TNUHDB shall decide on which documents are to be digitalized on premise.&nbsp;</p><p>It may be noted by the bidder that the content and files maintained, and the language of noting are in Tamil and English. The Survey Sketches for the MUDP/TNUDP and other schemes as available with CMDA to be obtained and digitalized as per TNUHDB direction. &nbsp;</p><ol><li><ol><li><ol><li>Documents scanning and digitalization requirements</li></ol></li></ol></li></ol><p>While digitalizing the documents, the SI should at least follow the following digitalization steps.</p><p><strong>Digitalization steps</strong></p><ol><li>Initiation</li><li>Pre-scanning</li><li>Data Entry</li><li>Document scanning</li><li>Indexing</li><li>Archival of Electronic Documents &ndash; Backup</li><li>Quality Check</li><li>Post scanning</li><li>Storage upload in SDMS</li><li>Data Backup</li><li>Training</li></ol><p>The sub-activities for above each step are mentioned in figure below.</p><p>&nbsp;</p><p><em>Figure - Sub-activities for Digitalization of documents</em></p><ol><li>SI, if required, may add sub-activities (to respective step) which are required for digitalization of documents. The SI must comply the activities which are provided in this section.</li><li>SI shall study from the respective Department of TNUHDB and then clearly understand the quantum of work relating to indexes accordingly. The Capturing, Indexing, and storing metadata and relevant information of these documents shall be discussed by TNUHDB with SI before starting the digitalization of the records.</li><li>SI shall maintain requisite registers for receiving the records, documents, scanning, uploading and return the same to department in TNUHDB.</li></ol><p>For example, the following details shall be captured:</p><ol><li><ol><li>Name &amp; Location of the Office</li><li>Name of Department official with mobile number</li><li>Name of the Vendor Personnel with mobile number</li><li>Type of Book/Index (Book-1, Book-2, Book-3, Book-4, Book-V, Index-1, Index-2 etc.)</li><li>Year of the document</li><li>Size-wise (A0, A1, A2, A3, A4 etc.) count of pages<ol><li>Total number of pages</li><li>Number of pages missing</li><li>Number of pages torn/damaged</li><li>Number of pages in good condition along with document numbers.</li></ol></li><li>Metadata entry fields</li></ol></li><li>Blind double data entry mechanism to minimize the QC time for the user department and to get the error free record</li><li>Ensure that the contents of the digitized documents shall be an exact replica of the original paper document maintained as part of the records in the books</li><li>Under no circumstances shall the documents be changed, mutilated, destroyed, or replaced by some other documents.</li><li>Any deviation to this shall be considered as Violation and suitable action shall be initiated against the bidder. The documents and their contents shall not be tampered with</li><li>The SI should check the quality of the scanned documents including the indexed metadata and make the same available to TNUHDB team for quality check</li><li>Each Book &amp; File should be labeled with a printed barcode sticker. The barcode should contain the parameters, which shall be discussed and mutually agreed with TNUHDB by SI</li><li>Each sheet/page shall be serially arranged and shall be counted while giving the documents back</li><li>The entire data should be uploaded onto digitalization database on cloud environment identified by TNUHDB.</li><li>The SI must take backup of the scanned documents and other related data daily</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>Infrastructure and manpower deployment requirements</strong></p><ol><li>The SI to deploy, arrange, install &amp; configure the required Infrastructure viz. &ndash; scanners, desktops/laptops (along with connecting cabling and power extension cords if required), printers, cameras, UPS, furnishing (table, chairs and others) &amp; manpower at the identified location of SI and/or TNUHDB for the data digitalization scope of work activities.</li><li>The confidential documents of TNUHDB shall be scanned and digitalized at TNUHDB&rsquo;s premise. TNUHDB shall provide the space for the same.</li><li>The non-confidential documents of TNUHDB can be scanned and digitalized at SI&rsquo;s premise. SI shall have to arrange the space for the same.</li><li>The space and furniture (table, chairs, etc.) for setting up the infrastructure as well as the raw power connections will be arranged by SI.</li><li>The SI must deploy, arrange, install &amp; configure the required Infrastructure viz. &ndash; scanners, desktops/laptops (along with connecting cabling and power extension cords if required), printers, cameras &amp; manpower at the identified location of SI for the Scope of work activities.</li><li>The SI deploy its own human resource for all the above-mentioned activities. SI shall deploy adequately skilled manpower resources for Supervision, scanning, data entry, indexing, unbinding, and rebinding to complete the job within the specified time.</li><li>After completion of scanning, the sheets/pages are to be made into volumes so that the original volume is recreated as is at the stage of handing over for scanning purpose and undertake proper book binding of the papers.</li><li>The method of rebinding to be used is &ldquo;Hardcover binding&rdquo; method using good quality Rexine cloth cover, head band, spine, end paper, tail paper etc. The color of the Rexine cloth shall vary for Indexes &amp; Volumes and the same shall be informed to bidder by TNUHDB Department. The binding should be undertaken with quality material with a minimum lifespan of thirty years. &nbsp;</li></ol><p><strong>Input specifications</strong></p><ol><li>Approx. 90% of TNUHDB documents of are A4 and legal size and the remaining are in other sizes such as A-3, A-2, B-4, B-5 and others. Maps and treaties are to be mainly undertaken in A0 size. Samples of different types of records shall be shown during the site visit.</li><li>Records are old, fragile, deteriorating, rare and brittle.</li><li>Some of the pages of the records have stain-marks and worm-marks.</li><li>The pages of some records have become translucent due to ageing.&nbsp;&nbsp;&nbsp;</li></ol><p><strong>Non-technical requirements</strong></p><ol><li>Rebinding of books/files/others<ol><li>After completion of scanning, the sheets/pages are to be made into volumes so that the original volume is recreated as is at the stage of handing over for scanning purpose and undertake proper book binding of the papers.</li><li>The book volumes which are in bad shape in terms of binding/cover etc. should also be rebounded to the extent possible. If rebinding is not possible, the same may be informed to TNUHDB department and with the permission of the department, the lose papers shall be preserved in polythene covers and made a volume with such loose sheets. The quality of polythene covers shall be of such that it should last for at least thirty years.</li><li>The method of rebinding to be used is &ldquo;Hardcover binding&rdquo; method using good quality Rexine cloth cover, head band, spine, end paper, tail paper etc. The color of the Rexine cloth shall vary for Indexes &amp; Volumes and the same shall be informed to bidder by TNUHDB Department. The binding should be undertaken with quality material with a minimum lifespan of thirty years.</li></ol></li><li>At the time of handing back the documents to the designated official of TNUHDB Department, if any discrepancy is noticed the same needs to be recorded in the Data entry module with proper remarks</li><li>Should archive the documents based on the defined folder and file structure, and interval or period of archival of electronic documents</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure IV - Track 3: IT Infrastructure procurement, supply, Installation, and bandwidth for the project</strong></p><p>This section details the IT, Network and security Infrastructure requirements for the various applications which are part of proposed Digital Strategy for TNUHDB.</p><p>The IT infrastructure scope includes Information Technology (IT) infrastructure procurement, deployment and maintenance of the required Infrastructure as intended.&nbsp;</p><p>System Integrator needs to do the appropriate solution design and sizing for the project as per the scope of work.</p><p>The objectives of this IT procurement are to:</p><ul><li>Provide the TNUHDB with a secure, reliable, and scalable IT infrastructure that will support its current and future needs.</li><li>Improve the efficiency and effectiveness of the TNUHDB&#39;s IT operations.</li><li>Reduce the overall cost of IT ownership for the Board.</li></ul><p>The brief scope of work for this section includes the following:</p><ul><li>Identify Cloud Service provider and build Data Centre on High Availability Cloud Site and Disaster Recovery Site with hot standby configuration</li><li>Design and implementation of Secure and Flexible Data Network for the Head office and remote offices as per user requirement</li><li>Deployment of security solutions to protect the TNUHDB&#39;s data and systems.</li><li>Provision of end-user devices and software as per user requirement.</li><li>Provision of ongoing maintenance and support services.<ol><li><ol><li>IT Infrastructure Requirements</li></ol></li></ol></li></ul><ol><li>The System Integrator shall facilitate and coordinate for procurement, supply and installation of entire IT infrastructure required for setting up and operations of the Project Management System, ERP System, Citizen Web Portal, Employee portal and Grievance Redressal Management system including the following key components of IT Infrastructure are to be setup.<ol><li><strong>Hosting of Data Centre </strong>on Cloud Service Provider Premise&nbsp;</li><li><strong>Disaster Recovery Centre</strong> on Cloud Service Provider premise</li><li><strong>Enhancement of existing Local Area Network (LAN)</strong> at TNUHDB Head Office at Chennai, Estate and Regional Offices spread statewide</li><li><strong>Data Digitization </strong>and Integration of Digitized Data with Document Management System</li><li><strong>Experience Centre </strong>at Head office of TNUHDB and <strong>Citizen Kiosk</strong> at Various Citizen Interfaces<strong> </strong></li></ol></li><li>SI needs to propose the IT infrastructure deployment architecture to meet the required security guidelines and SLA as per the RFP. SI need to provide the detailed proposed solution design to meet the requirement of RFP.</li><li>The IT infrastructure includes servers, storages, back up, networking, load balancers, security equipment, operating systems, database, enterprise monitoring system, help desk system, Computers, Printers, and other related IT infra required for running and operating the envisaged system. The IT infra procurement will be planned considering the below factors:<ol><li>Ensure redundancy at each level</li><li>No single point failure in architecture</li><li>Support peak loads</li><li>IT infrastructure deployed for TNUHDB Digitization Strategy should be dedicated but accommodative at the same time for the upcoming projects.</li><li>The ownership of IT infrastructure shall get transferred to TNUHDB after &ldquo;Acceptance and Go Live&rdquo; of such items. In case the infrastructure is proposed to be supplied by SI in phases (For assets proposed to be supplied after Go Live) the payment for the same shall also be made in phases after actual delivery and acceptance of such infrastructure at other offices at defined locations. Ownership of these infrastructures shall also be transferred to TNUHDB after verification and acceptance of such infrastructure</li><li>Initial estimate for procurement of hardware is as per the volumetric estimate for total users provided in Annexure. SI need to conduct their detailed study and shall come up with appropriate quantities for various equipment of IT infra for this project.</li><li>SI to ensure warranties/AMCs are procured for all the hardware components for entire duration of the project. For software components the support from OEM to be obtained for prescribed components. There should be a dedicated tool to maintain licensing, warranty details on annual basis.</li><li>Minimum specifications of the IT infra are detailed in Annexure &ldquo;Bill of Material (BOM) compliance sheet&rdquo; of the RFP document, the bidder needs to size and provide IT infra to meet the project functional requirements and Service Level Agreements (SLAs).</li><li>Other details relating to IT infra, info security, etc. are mentioned in &ldquo;Bill of Material (BOM) compliance sheet&rdquo; of this RFP document.</li><li>SI is to prepare and submit along with their technical bid, the details of methodologies and computations for sizing and capacity of storage, compute, Port density of network devices, sizing of security appliances and their compute requirements. The technical evaluation of responses shall analyze the computations for viability.</li><li>SI must ensure that the proposed architecture meets the security requirements as mentioned into the section &ldquo;x&rdquo; of this RFP document.</li></ol></li><li>SI must consider the following important milestones while proposing the IT infrastructure architecture for TNUHDB information portal and Digitalization system:<ol><li>Site Survey</li><li>Design assessment</li><li>Supply of Passive components</li><li>Preparation of Network room setup, network plan with rack wise node details (in form of excel tables) and cable layout route diagrams.</li><li>Cable laying and testing of the laid cable</li><li>Supply of active Components</li><li>Installation, Test Run and testing of the Head office and Remote Office Connectivity</li><li>Integration with other peripheral Systems/Services</li><li>Network Monitoring System (NMS) configuration for central monitoring and management.</li><li>Submission of test reports.</li><li>Training of technical TNUHDB&rsquo;s staff for Operations and management.</li><li>Posting of network engineers &amp; technicians at site as stipulated in contract</li><li>Security audit by a third party.<ol><li>IT infrastructure deployment plan</li></ol></li></ol></li></ol><ol><li>SI needs to propose the IT infrastructure deployment architecture to meet the required security guidelines and SLA as per the RFP. Illustrative deployment architecture at both Cloud and Head office with minimum infrastructure and security requirements is given below, however SI need to provide the detailed proposed solution design to meet the requirement of RFP. Detailed requirement related to infrastructure and security as illustrated in the design below is detailed in subsequent sections.</li></ol><p>&nbsp;</p><p><em>Figure - TNUHDB overall infrastructure deployment architecture</em></p><p>&nbsp;</p><p>Important Functional Considerations while design &amp; deployment of Architecture.</p><ol><li>All components to be maintained in redundancy with Active - Active / Active- Passive Clustering based on the SLA requirements, architecture, and performance. The systems architecture should clearly demonstrate and highlight the key requirements of TNUHDB viz reliability, availability, scalability, survivability, resilience, and serviceability of individual critical components.</li><li>Servers should be based on x86 platform in high density form factor to ensure optimal power and space usage. However, bidder may suggest rack form factor for any specific server usage, stating clearly the benefits being derived without compromising on the power and cooling factors</li><li>The architecture should have horizontal scalability. Benefits/additional security, reliability, availability features at the server level architecture would be given due consideration during evaluation.</li><li>SI needs to comply with the high availability requirements for the IT Infrastructure.</li><li>Redundancies/teaming should be maintained at different interconnecting fabrics to avoid any single point of failure / performance bottleneck.</li><li>The backup solution should ensure minimization of data to be backed-up / archived keeping in view a window of 8 Hours without any impact on the performance of the servers.</li><li>Networking equipment should be capable of processing IPV4 &amp; IPV6 traffic. Security features that are delivered shall be IP v 6 ready</li><li>All devices should be IPv4 and IPv6 ready from day 1. SI shall deploy IPv4 and IPV6 dual stack supported network from day 1. The proposed solution and all appliances should meet this requirement. The SI shall also be responsible for security adherence on both IPv4 and IPv6.</li><li>Bidder should utilize virtualization technology to optimize the solution and provide benefits for the overall Cost of ownership and ease of maintenance wherever required.</li><li>DNS server is required for domain name and the interoperation between Primary DC and DR site should be such that due to any failure of any/all module at DC level can automatically (manual optional) be operated from DR site.</li><li>SI need to provide the published benchmarks for the stated systems along with the sizing assessment sheet being certified by the OEM for the stated systems.</li><li>The bidder shall submit the OEM authorization letter, in original duly clearly attested as per prescribed format for the following components.<ol><li>Server, Workstations, Plotter &amp; Storage if any</li></ol></li></ol><ol><li><ol><li>Firewall/UTM, IPS, Load Balancer</li><li>All Active Network equipment like, router, switches, wireless Access Points, NMS</li><li>Passive Network equipment like, Fiber optic cable, Patch cords, LIU, CAT 6 cable, Patch panel, Racks.</li><li>Video wall, AV Components</li><li>Software like Antivirus, EMS, Helpdesk &amp; Contact Centre solutions<ol><li>Cloud Hosting</li></ol></li></ol></li></ol><p>The scope of services for the Cloud hosting of Data Center is as follows:</p><ol><li>TNUHDB is considering a High Availability Site on cloud platform which would host all applications, application data, User data and Digitized Data. A Suitable cloud environment in terms of compute, storage, managed network &amp; security services should be offered by Cloud Service Provider. A quick turnaround to cloud-based failover system for business continuity shall considered through disaster recovery site which would be clone of HA site.</li><li>SI shall be responsible for<ol><li>setting up, installation, configuration, management, upgradation, and migration of application servers, database servers/storage.</li><li>Maintain and manage the required network components for the cloud services procured by TNUHDB.</li><li>Setup and configure the VMs, storage, Network, Database etc. at DC &amp; DR site meeting RPO and RTO (Recovery Time Operations) requirements of TNUHDB. Service provider shall provide access to logs for analysis.</li></ol></li><li>For this cloud-based managed service will help TNUHDB to quickly recover TNUHDB&rsquo;s critical systems after a disaster and provides client remote access to their systems in a secure virtual environment. This shall help TNUHDB to switch to failover with smaller RPO.</li><li>The SI shall be responsible for setting up, installation, configuration, management, upgradation, and migration of application servers, database servers/storage. Implementation includes finalize Migration Preparation, Preparation of new Procedures, Migrate Data, Finalize Migration Effort, Cost Benefit Analysis</li><li>The SI should maintain and manage the required network components for the cloud services required for TNUHDB. Setup and configure the VMs, storage, Network, Database etc. at DC &amp; DR site meeting RPO and RTO (Recovery Time Operations) requirements of TNUHDB. Cloud Service provider shall provide access to logs for analysis.</li><li>The SI shall consider only &ldquo;MeitY&rdquo; or &ldquo;Government of Tamil Nadu&rdquo; empaneled cloud service providers for hosting DC &amp; DR site.</li><li>DC &amp; DR Site should preferably be in the following cities:</li></ol><ol><li>Bangalore City</li><li>Chennai City</li><li>Hyderabad City</li><li>Kolkata City</li><li>Mumbai City</li></ol><ol><li>Cloud Service Provider should host the entire Cloud infrastructure in a secure Data Centre which should be at least Tier 3 Compliant facility adhering TIA 942 standard.</li><li>Cloud Service Provider should ensure that Data Centre constructed to world class hosting standards as defined by the &ldquo;Uptime Institute, USA&rdquo;.</li><li>Cloud Service Provider should ensure that services provided are to be backed by high QOS (Quality of Service) / SLA (Service Level Agreement)</li><li>Cloud Service Provider should ensure to have Centralized NMS (Network Management Systems) &amp; 24*7*365 helpdesk for services related to DC &amp; DR site.</li><li>Cloud Service Provider should provide advanced system security, monitoring &amp; management with Video surveillance, fire detection &amp; suppression system as per standards of Data Centre</li><li>Cloud Service Provider should ensure that Fire Suppression and Protection System should include three levels of redundancy based on Gas Fired Systems, Carbon Monoxide based systems and Water Sprinkler based systems.&nbsp; Bidder should ensure that the floors as well as the ceiling should be based on false flooring and ceiling where the wire conduits and the fire protection systems are installed.</li><li>Cloud Service Provider shall be responsible for implementation, management, and monitoring of DDOS, IPS, IDS Services, etc. Service provider will implement anti-malware and conduct regular vulnerability scanning and penetration testing of systems and infrastructure.</li><li>Cloud Service provider shall have public Services in DMZ zone and High security services in MZ Zone. Also, the Cloud Service Provider shall configure external connections to the hosting infrastructure required to upload database/files etc.</li><li>Cloud service provider is expected to understand the complete architecture of existing applications and processes necessary for smooth migration of applications and databases including interdependencies between applications and data. Bidder shall be responsible for deployment of Security patches on Hardware and Software.</li><li>Cloud Service Provider shall be responsible for migrating legacy applications to cloud if any and managing the cloud services. Also, responsible to monitor the cloud services and ensure 99.9% uptime of all services as per agreement.</li><li>Cloud service provider shall establish connectivity between TNUHDB Head office to Cloud DC &amp; DR Site. Also, SI shall ensure Deployment of New Applications on cloud, security administration, planning and implementation of cloud management and monitoring portals for complete infrastructure and services procured.</li><li>Service Provider shall provide inter-operability support with regard to APIs and Data Portability.</li><li>The SI shall be responsible for monitoring and reporting services.</li><li>Provisioning of scalable storage capacity as per requirements of TNUHDB and availability of such services as per agreement. Cloud Service provider shall ensure committed time taken for restoration of data from Backup as claimed.</li><li>Cloud Service provider shall demonstrate/Submit documentary proof for POC (Proof of Capability) as part of technical evaluation to understand the key features such as AUTO Scale up/down, Cloud Elasticity, Security protocols, Denial of Service (DoS, DDoS) attack), management and administration and audit capabilities of offerings, setting up of DC &amp; DR facilities, etc.</li><li>Service provider shall provide necessary technical documentations, design documentations, standard Operating Procedures (SOPs) required for operations and management of services.</li><li>All risk management related to migration, migration plan shall be jointly worked out with TNUHDB and Cloud Service Provider.</li><li>Service provider with SI shall assist TNUHDB in planning for capacity building to meet growth and peak load assessment at the end of first year to ensure future requirements of TNUHDB are addressed.</li><li>The service provider shall provide necessary details including sizing, current loads, utilization, expected growth/demand and other details for scale up/scale down at the end of first year in close coordination with TNUHDB.</li><li>Service provide shall provide Annual Technical Support from OEM under (Software procured as PaaS) during entire period of Contract.</li><li>TNUHDB and Service provider shall jointly workout multi-factor authentication for root account as well as any other privileged identity and access account associated with it.</li><li>Service provider shall be responsible for implementation of tools and processes for monitoring the availability of applications, responding to system troubleshooting.</li><li>Monitoring of performance, resource utilization and other events such as failure of services, degradation of services, availability of network, storage, Database systems, OS etc.</li><li>Provide the relevant reports, including real time as well as past data/reports on dashboard.</li><li>Service provider shall be responsible for conduct of DR Drills and follow Standard Operating Procedures (SOP) and inform TNUHDB in advance for such drills conducted twice a year normally, with 15 days&rsquo; prior notice.</li><li>There should not be any data loss during backup from DC to DR.</li><li>Service Provider shall monitor Internet Links, MPLS -VPN including bandwidth, data transfer, response time and packet loss and perform corrective measures.</li><li>After the implementation of exit process, cloud service provider will delete/remove VMs, contents and data with approval of TNUHDB and ensure data cannot be forensically recovered and intimation of compliance thereafter.</li><li>The Service Provider will train and transfer the knowledge to the replacement agency or TNUHDB to ensure continuity and performance of services post expiry of Contract.</li></ol><p><strong>Role of SI in Cloud Hosting</strong></p><ol><li>SI shall be responsible for management of all TNUHDB&rsquo;s web applications hosted on Service provider&rsquo;s platform or any other environment.</li><li>SI shall be responsible for all web application SLA with TNUHDB.</li><li>SI shall be responsible for design/development and management of all web applications.</li><li>SI shall be hosting applications on Service provider&rsquo;s platform which include application configuration, addition and deletion of modules and ensure application functionality as per end user&rsquo;s requirements.</li><li>SI shall be responsible for planning and sizing of applications along with its architecture.</li><li>SI shall be responsible for remote administration of applications on VMs provided by Service provider through VPN.</li><li>SI will estimate the requirements of Infrastructure resources (like VMs, Storage etc.) for different environments such as production, pre-production (non-live environment), test environment etc.</li><li>SI shall workout minimum resource requirements as well as indicative requirements of services like IP address/Load/Data transfer in Local and DR site etc.</li><li>In case of New Projects TNUHDB will procure software, licenses or may procure/ subscribe the minimum required licensees as part of PaaS (Platform as a Service)</li><li>SI will specify additional Security requirements for some applications like PCI-DSS. Data Encryption, Third Party authentication support (e.g., e-sign/Digital signing Certificates) for Payment gateway requirements.</li><li>SI with TNUHDB shall define the data retention period for all applications as per need basis application-wise.</li><li>SI with TNUHDB shall define the Log retention policy, application-`wise as per need.</li><li>SI shall work out estimated size of data for backup wherever possible.</li><li>SI shall be responsible to conduct of regular vulnerability scanning and penetration testing of applications and fixing up of such vulnerabilities.<ol><li><ol><li>Local Area Network</li></ol></li></ol></li></ol><p>The scope of services for the Local Area Network (LAN) is as follows:</p><ol><li>The SI shall design, build, operate, and maintain the LAN (at TNUHDB Head office and other offices spread statewide) during the project duration. The objective of creating LAN is to connect all the offices &amp; to have seamless internet connectivity to all users/employees in those offices.</li><li>The SI shall consider all necessary hardware &amp; software required to setup Local area network for easy dissemination of information. If any additional hardware/software required other than specified equipment to comply all points of scope of work and technical requirement, SI needs to specify the same in technical bid.</li><li>In existing LAN set up, the users are connected over copper UTP backbone through creating distribution hubs for every office or floors. SI shall consider replacing the old devices and setting up Gigabit LAN on fiber optic backbone using distribution switches at TNUHDB Network room &amp; access switches at every floor for last mile connectivity.</li><li>All the networking equipment shall be housed in separate rack at TNUHDB Network room and shall be referred as network racks. These racks will house core router, firewall/UTM, Core Switch &amp; the passive networking equipment with&nbsp;</li><li>The SI shall consider providing efficient data security solutions which will keep the sanctity of data intact.</li><li>Network Fabric should support both IPv4 and IPv6 from day one.</li><li>The head office and remote office network will be monitored and managed through Network Monitoring System (NMS) or Enterprise Management System from NOC. Required Server infrastructure &amp; software for NMS shall also be considered by bidder.</li><li>The SI shall consider minimum Gigabit switches with suitable port density as per users on each floor and shall keep 20% spare considering future prospect.</li><li>The SI shall provide Face plate, backbox &amp; information outlets for each node as per provided technical specification.</li><li>The SI shall consider CAT6A shielded UTP cable for internal cabling at offices, while cables shall be laid through a good quality PVC conduit of appropriate diameter.</li><li>Wireless connectivity through access points shall be considered to provide internet connectivity to mobile devices at offices &amp; office lobbies, a fast &amp; smooth handoff shall be featured to provide seamless mobility of devices. WLAN shall be monitored for authentication &amp; metering perspective, if required.<ol><li><ol><li>Network Operation Centre (NOC)</li></ol></li></ol></li></ol><p>SI shall build operate a network room cum operation centre from where it will house Network and Security equipment all Enterprise resources like Network, Applications, Hardware, and Connectivity to be monitored and analyzed for the day-to-day operations at TNUHDB Head Office.</p><ul><li>TNUHDB intends to host all their network equipment such as switches, routers, racks and security equipment such as load balancers and firewall in the NOC</li><li>IT Administrators for various systems shall be based out of Network Operations Centre (NOC) and they will collect and monitor the logs of various systems for any fault or errors. Space for monitoring team should be considered while designing.</li><li>Also, the NOC may host rack servers and these rack servers shall host common services such as Active directory/domain controller, Antivirus application and other local services.SI to make sure that these services are high availability.</li></ul><p>SI to make sure these services are</p><p>The scope of services for the Network Operations Centre (NOC) is as follows:</p><ol><li>The SI shall build, operate, and maintain the NOC during the project duration. The minimum specified work to be undertaken by SI for setting up and operating and maintaining NOC has been categorized as under:<ol><li>Design, Supply, Installation, and Commissioning Phase of Network</li><li>Operation and Maintenance phase</li></ol></li><li>Design of the NOC<ol><li>The SI should consider designing NOC</li><li>The TNUHDB shall provide the adequate space [of approx.300 sq. ft.] for building the proposed NOC. The existing servers and racks if any to be accommodated in this newly built NOC. The SI may assess the existing infrastructure by visiting proposed site location, if required and accordingly submit the proposal</li><li>The NOC shall be provided with sufficient electrical connections, Air conditioning, backup power through UPS, Electronic surveillance, access control system, fire detection &amp; suppression system and other soft services as applicable for network operations centre as required for the proposed equipment on 24 x 7 x 365 basis to maintain 100% uptime of network equipment.</li><li>The SI should ensure the multi-layer security infrastructure to prevent unauthorized access to the network &amp; monitoring system.</li><li>The SI should ensure to provide high quality Active &amp; Passive Networking equipment and other associated IT Components in the NOC.</li><li>The NOC should be fully redundant in terms of electrical circuits, cooling, and network.</li><li>The SI with TNUDHB shall make sure that the required power, air conditioning, security system and other facilities provided is always available.</li><li>The total power requirement shall be estimated &amp; furnished in Technical Bid with 20% or appropriate redundancy in case of additional requirement.</li><li>The SI shall make necessary provisions of Telecom junction box / multiplexers for termination of internet links, if required</li><li>The nodes should connect over 1G IP connectivity. Each node shall have Minimum 2 x1G Ethernet port. There should be no use of any proprietary or specialized interconnects.</li><li>The Virtualization software should be based on hypervisor technology which sits directly on top of Hardware (Bare Metal).</li><li>The Proposed Storage Solution should support model of thin provision and thin reclaim disks to avoid allocating all storage space at initial stage.</li><li>It should support migration of the live Virtual Machine files from one storage array to another storage.</li><li>The proposed solution should deliver above listed capabilities using standard storage infrastructure. client&rsquo;s maintenance team to avoid dust entering racks/cage area.</li></ol></li><li>Supply/ Installation<ol><li>All the compute devices &amp; storage</li><li>Physical infrastructure components such as UPS and Air-Conditioning System, Fire Detection and Suppression System, Lighting system, Rodent Control, Water leakage detection system, CCTV Surveillance systems, Access Control System, Electrical Cabling and Network Cabling etc. as per requirement</li><li>IT Infrastructure components such as necessary Servers, Networking &amp; Security components, Storage media, Software and other IT components required for managing the data center.</li><li>The SI should provide racks of 42U size with inter-rack cabling, cross connects to communication area. The racks should have proper cable managers (vertical and horizontal) and troughs for complete structured cabling. Blanking panels etc., if required as per Industry best practice to be provided. The SI shall provide adequate power points of required specifications in the racks with redundant UPS power.</li><li>The rack area should be sufficient to house the maximum number of racks as mentioned above along with sufficient free space for opening of front and rear rack doors for installation/replacement/trouble shooting of hardware and movement of service personnel.</li><li>The SI shall consider installing console and monitoring systems at NOC so that IT administrators of all the proposed systems shall be stationed at NOC<ol><li>Internet Infrastructure and Connectivity</li></ol></li></ol></li></ol><p>The objective of Internet Infrastructure and connectivity is to provide secure application access to intranet and internet applications, enforcing internet/email policies and seamless transfer of data. The scope of providing the Internet Infrastructure and connectivity is as follows:</p><ol><li>The SI shall provide the Internet infrastructure and connectivity at Head Office, TNUHDB and remote offices.</li><li>The internet infrastructure and services are to be provided as per the following requirements.</li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"width:85%\"><tbody><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:22.8pt; width:7.34%\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; height:22.8pt; width:56.18%\"><p><strong>Location</strong></p></td><td style=\"background-color:#4472c4; height:22.8pt; width:20.24%\"><p><strong>Bandwidth (Mbps)</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:22.8pt; width:16.24%\"><p><strong>Quantity</strong></p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>1</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Internet to Head Office, Chennai</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>500</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>2</p></td></tr><tr><td style=\"border-color:#8eaadb; height:.2in; vertical-align:top; width:7.34%\"><p><strong>2</strong></p></td><td style=\"height:.2in; vertical-align:top; width:56.18%\"><p>Internet to Estate and Regional offices</p></td><td style=\"height:.2in; vertical-align:top; width:20.24%\"><p>50</p></td><td style=\"height:.2in; vertical-align:top; width:16.24%\"><p>21</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>3</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Head Office to DC/DR (MPLS)</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>10</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>1</p></td></tr><tr><td style=\"border-color:#8eaadb; height:.2in; vertical-align:top; width:7.34%\"><p><strong>4</strong></p></td><td style=\"height:.2in; vertical-align:top; width:56.18%\"><p>DC - DR (MPLS)</p></td><td style=\"height:.2in; vertical-align:top; width:20.24%\"><p>10</p></td><td style=\"height:.2in; vertical-align:top; width:16.24%\"><p>2</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>5</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Estate and Regional offices to Head Office (VPN)</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>1</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>21</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>The following is a pictorial view for the above-mentioned requirements.</p><p>&nbsp;</p><p><em>Figure - Indicative Network and Internet connectivity diagram</em></p><p>&nbsp;</p><ol><li>The Internet connectivity should have fully dedicated (1:1), unshared &amp; High-Quality symmetric bandwidth without any compression factor through Optical Fiber</li><li>Installation, commissioning, configuring of the link and hardware (Modems and Router etc.).</li><li>24x7 Support for Internet Infrastructure and Services</li><li>Maintenance of Internet Infrastructure and Provide Services during the entire period of contract term.</li><li>The SI will be required to sign Service Level Agreement (SLA) having the following:<ol><li>Packet Losses: Less than 1% (Average over 1000 ping).</li><li>Network Availability: More than 99.5 % per month.</li><li>Reports for performance, monitoring /usage to be submitted by the ISP on weekly or monthly basis or as per requirement of TNUHDB.</li><li>In case of the above parameters going out of specifications, TNUHDB will be compensated adequately in respect of the extended time for the loss of hours in service. Also, if services are not found satisfactory, TNUHDB reserves the right to cancel the contract with &ndash;one-month notice.</li><li>In case connectivity from Fiber cable is failed, the same connectivity speed will have to be provided through wireless line by the service provider.</li><li>99.5% Uptime shall be calculated as, (Total Time &ndash; Down Time) X 100 /Total Time. Deduction in payment will be made for downtime in the quarterly bills raised by the SI / Service Provider (SP).</li><li>The services shall be provided 24 hours &amp; 7 days in a week.</li><li>The SI will be responsible for undertaking any civil/electrical work etc., involved from commissioning to the completion of the project, at his cost.</li><li>Obtain all necessary rights-of-way and permits for construction of pathways and installation of telecommunications cabling necessary to implement the proposed solution. The SI should take necessary permission TNUHDB will assist for the same.</li><li>Provide a low-latency, highly reliable, high-speed Internet service. The connection shall provide to TNUHDB is able to conduct business operations as per the specified bandwidth requirements and as defined by agreed upon Service Level Agreements (SLA).</li><li>The proposed connection shall be capable of meeting the defined performance standards throughout the entire term of the contract.</li><li>Network integrator for the installation, configuration management, commissioning of Internet link, establishing automatic switch-over from primary link to the backup link and vice-versa.</li><li>ISP should have fully functional 24x7x365 Customer Service Centre in Mumbai.</li><li>The ISP for providing internet connectivity should be Tier-I or Tier-II only.</li><li>Primary &amp; back up connectivity shall be from two different ISPs.</li></ol></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure V - Track 4: Training and Capacity Building </strong></p><ol><li><ol><li><ol><li>Introduction</li></ol></li></ol></li><li>The purpose of this section is to define the scope of work for training and capacity building.</li><li>SI&rsquo;s scope of work also includes preparing the necessary documentation and aids required for successful delivery of such trainings.</li><li>The details provided in this section are indicative and the number of training sessions may increase.</li><li>SI shall be responsible for providing training to stakeholders, at least, on the usage and maintenance of TNUHDB information portal &amp; mobile app, Solution System, DC, Cloud DR, LAN, FTTP Network, Helpdesk and Experience Centre.</li><li>SI shall propose different training modules for different user profiles at the appropriate timelines in the project.</li><li>SI shall provide such additional training as they deem necessary to ensure that the training imparted is comprehensive and complete.</li><li>SI shall design a calendar of training activities, for various solution components of the TNUHDB project including at least on the Project Management System, ERP System, Citizen &amp; Employee portal Experience Centre, Helpdesk operation and others, in consultation with TNUHDB. The calendar designed shall identify the type of training (comprehensive competency-based training), topics to be covered and the details on trainee, trainer, and the venue. The training calendar is to be prepared in the following format -</li></ol><p><em>Training calendar format</em></p><table border=\"1\" cellspacing=\"0\"><tbody><tr><td style=\"background-color:#4472c4; height:30.65pt; width:36.3pt\"><p><strong>Sl. No.</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:102.9pt\"><p><strong>Type of training</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:59.05pt\"><p><strong>Topic</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:61.6pt\"><p><strong>Dates</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:77.2pt\"><p><strong>Trainer</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:90.8pt\"><p><strong>Trainee</strong></p></td></tr><tr><td style=\"background-color:#d9e2f3; height:30.65pt; width:36.3pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:102.9pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:59.05pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:61.6pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:77.2pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:90.8pt\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><ol><li>SI shall submit a training completion report to TNUHDB after completion of every training.</li><li>SI must propose an appropriate training model in their bid and must propose detailed methodology on how the training would be conducted.&nbsp;&nbsp;</li><li>SI shall be required to arrange training infrastructure along with providing the training plan, training content &amp; the training delivery and bear the cost for the same. TNUHDB shall provide the training room and the venue for the training.</li><li>SI shall be responsible for making sure that all the TNUHDB Officials and other users are technically equipped to operate the solution and related devices.</li><li>SI shall be responsible for conducting training sessions for departmental users covering TNUHDB officials in Chennai and across all Divisions, Regional and Circle Offices.</li><li>SI shall organize regular half yearly trainings for new joiners in the TNUHDB departments until their Operation and Maintenance Period.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><ol><li>Training requirements</li></ol></li></ol></li></ol><p><strong>Types of training</strong></p><ol><li>To make TNUHDB Project a success, the following training programs are to be arranged by the SI from time to time depending on the requirement and understanding of TNUHDB Officers and Staff.</li></ol><p><em>List of Training types</em></p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:67.25pt\"><p><strong>Type of training</strong></p></td><td style=\"background-color:#4472c4; width:1.25in\"><p><strong>Relevant Stakeholders</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:310.25pt\"><p><strong>Scope</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:67.25pt\"><p><strong>Administrative &amp; Project related </strong></p></td><td style=\"background-color:#d9e2f3; width:1.25in\"><p>TNUHDB officials</p></td><td style=\"background-color:#d9e2f3; width:310.25pt\"><ol><li>Training on project management</li><li>Training on transition management</li><li>Training on change management</li><li>Training on business knowledge</li></ol></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:67.25pt\"><p><strong>Functional</strong></p></td><td style=\"vertical-align:top; width:1.25in\"><p>TNUHDB officials</p></td><td style=\"vertical-align:top; width:310.25pt\"><ol><li>Training on Project Management System application including all functions / modules</li><li>Training on Enterprise Resource Planning application including all functions / modules</li><li>Training on Data Digitalization Platform including scan, store, metadata creation, digital formats, digital records management, quality control,</li><li>Training on Citizen Web Portal</li><li>Training on Employee Portal</li><li>Training on Smart Module</li><li>Training on Helpdesk Solution</li><li>Training on Document Management System</li><li>Training on Content Management System</li><li>Training on GIS mapping</li><li>Training on BI &amp; Analytics module</li></ol></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:67.25pt\"><p><strong>Technical (Application &amp; Infrastructure</strong></p></td><td style=\"background-color:#d9e2f3; width:1.25in\"><ul><li>TNUHDB Officials</li><li>TNUHDB</li></ul><p>IT Team</p></td><td style=\"background-color:#d9e2f3; width:310.25pt\"><ol><li>Training on API details and integration requirements</li><li>Training on system operations</li><li>Training on IT Infrastructure setup, configuration, and troubleshooting (1st level) related training including cloud hosting, Network, Experience Centre, and others</li><li>Training on security aspects for Network, Experience Centre, and others</li><li>Training on EMS tool/software</li></ol></td></tr></tbody></table><p>&nbsp;</p><ol><li>SI shall identify at least two master trainers for each of the core areas who shall provide the relevant training. The list of such trainers to be submitted to TNUHDB from time to time (in case of any modifications). The task of the master trainers shall be to be a single point of contact for the training purpose of their respective specialized areas.</li><li>The Master Trainers shall be so identified by the SI which have complete knowledge of their respective domains (functional, technical, and operational).</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Preparation of training aids</strong></p><ol><li>SI will prepare all the requisite audio/video training aids that are required for successful completion of the training for all stakeholders. These include the following for all the stakeholders:<ol><li>Training manuals for TNUHDB officials and other stakeholders</li><li>Computer based training modules</li><li>Video (recorded sessions) for portal functionality, CMS, SDMS, business intelligence, dynamic reporting, and others.</li><li>Presentations</li><li>User manuals</li><li>Video based tutorial</li><li>Quick user guide</li><li>FAQs</li><li>Operational and maintenance manuals for the modules provided along with the TNUHDB system solutions</li><li>Application/modules training prototype for hands on training using dummy data</li><li>Regular updates to the training aids prepared under this project</li></ol></li><li>SI shall develop and supply training material at least for the following<ol><li>Applications including<ol><li>Project Management System</li><li>Enterprise Resource Planning -All modules</li><li>Data Digitalization Platform</li><li>Citizen Web Portal</li><li>&nbsp;</li><li>Employee Portal</li><li>Smart Module</li><li>Helpdesk Solution</li><li>Document Management System</li><li>Content Management System</li><li>GIS mapping</li><li>BI &amp; Analytics module</li><li>Mobile Application</li></ol></li><li>Infrastructure<ol><li>Cloud DC</li><li>Cloud DR</li><li>LAN</li><li>Experience Centre and Kiosk</li></ol></li></ol></li><li>SI must supply the training aids in Tamil and English. The material developed should be highly user friendly and such material shall be shared with TNUHDB by the SI.</li><li>SI will maintain a copy of all the training aids/material on the TNUHDB system solutions and access will be provided to relevant stakeholders depending on their need and role. The access to training on the portal would be finalized with TNUHDB. SI must ensure the following points:<ol><li>For each training session, the SI must provide the relevant training material (printed &amp; soft) copies to all the attendees.</li><li>All printed material should be in colored copies with standard printing quality</li><li>The contents developed shall be the property of TNUHDB will all rights.</li></ol></li></ol><p><strong>Number of trainings</strong></p><ol><li>SI must ensure that the personnel deployed for training are properly qualified and understand the area of their training in depth. This section covers the number of trainings that is required.</li></ol><p><em>Stakeholder&#39;s training requirements</em></p><table cellspacing=\"0\" style=\"width:100%\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:18.08%\"><p><strong>Stakeholders</strong></p></td><td style=\"background-color:#4472c4; width:13.64%\"><p><strong>Total Number of trainees to be trained</strong></p></td><td style=\"background-color:#4472c4; width:13.46%\"><p><strong>Minimum Number of trainees per session</strong></p></td><td style=\"background-color:#4472c4; width:11.56%\"><p><strong>Number of days or hours for each session</strong></p></td><td style=\"background-color:#4472c4; width:17.94%\"><p><strong>Training type</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:25.32%\"><p><strong>Details</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:32.45pt; width:18.08%\"><p><strong>TNUHDB Officials</strong></p></td><td colspan=\"5\" style=\"background-color:#d9e2f3; height:32.45pt; width:81.92%\"><p>&nbsp;</p></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:18.08%\"><p><strong>Other Stakeholders</strong></p></td><td style=\"vertical-align:top; width:13.64%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:13.46%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:11.56%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:17.94%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:25.32%\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><ol><li>The SI shall also be responsible for retraining the TNUHDB officials whenever changes are made in the application and/or personnel and it is the responsibility of the SI to ensure that everyone involved in the TNUHDB operations is familiar with new services.<ol><li><ol><li>Training Effectiveness</li></ol></li></ol></li></ol><ol><li>SI must ensure that the training sessions held are effective. For this purpose, SI will prepare a comprehensive feedback form that will capture necessary parameters on measuring effectiveness of the training sessions. This form will be discussed and finalized with TNUHDB.</li><li>After each training session, feedback will be sought from each of the attendees on either printed feedback forms or through a link available on the web portal. The feedback received would be reported to TNUHDB for each training session.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure VI- Track 5: Operations and Maintenance </strong></p><p>This section describes the operational requirements of the Digitization project which include all the Applications, Citizen portal, mobile applications and IT infrastructure such as Servers, Network set up, Security equipment, Experience Centre and Citizen Kiosk etc.&nbsp;</p><p>The high-level details of O&amp;M activities are mentioned below:</p><ol><li><ol><li><ol><li>Applications Support and Maintenance</li></ol></li></ol></li></ol><p>Application support includes, but not limited to, production monitoring, troubleshooting, and addressing the functionality, availability, and performance issues, implementing the system change requests etc. The SI shall keep the application software in good working order; perform changes and upgrades to applications as requested by the TNUHDB team. Key activities to be performed by SI in the application support phase are as follows:</p><ol><li>Compliance to SLA</li></ol><p>SI shall ensure compliance to SLAs as indicated in this RFP and any upgrades/major changes to the software shall be accordingly planned by SI ensuring the SLA requirements are met at no additional cost to the TNUHDB.</p><ol><li>Annual Technology Support</li></ol><p>The SI shall be responsible for arranging for annual technology support for the OEM products to TNUHDB provided by respective OEMs during the entire O&amp;M phase. For the following software&rsquo;s SI is mandatorily required to take enterprise level annual support for the entire contract duration:</p><ol><li><ol><li>Operating System</li><li>Virtualization layers</li><li>IT Infrastructure hardware, End user Hardware</li><li>Security Tools</li><li>Analytics tool</li></ol></li><li>Application Software Maintenance</li></ol><ol><li>SI shall provide unlimited support through onsite team/telephone/Fax/E-mail/Video Conferencing/installation visit as required</li><li>SI shall address all the errors/bugs/gaps in the functionality in the solution implemented by the SI (vis-&agrave;-vis the SRS signed off) at no additional cost during the O&amp;M phase.</li><li>All patches and upgrades from OEMs shall be implemented by the SI ensuring customization done in the solution as per the TNUHDB&rsquo;s requirements are applied. Technical upgrade of the installation to the new version, as and when required, shall be done by the SI. Any version upgrade of the software / tool / appliance by SI to be done after taking prior approval of TNUHDB and after submitting impact assessment of such upgrade.</li><li>Any changes/upgrades to the software performed during the support phase shall subject to the comprehensive and integrated testing by the SI to ensure that the changes implemented in the system meets the specified requirements and doesn&rsquo;t impact any other function of the system. Release management for application software will also require TNUHDB approval. A detailed process in this regard will be finalized by SI in consultation with TNUHDB.</li><li>Issue log for the errors and bugs identified in the solution and any change done in the solution shall be maintained by the SI and periodically submitted to the TNUHDB team.</li><li>SI, at least monthly, will inform TNUHDB about any new updates/upgrades available for all software components of the solution along with a detailed action report. In case of critical security patches/alerts, the SI shall inform about the same immediately along with his recommendations. The report shall contain SI&rsquo;s recommendations on update/upgrade, benefits, impact analysis etc. The SI shall need to execute updates/upgrades though formal change management process and update all documentations and Knowledge databases etc. For updates and upgrades, SI will carry it out free of cost by following defined process.</li></ol><ol><li>Problem identification and Resolution</li></ol><ol><li>Errors and bugs that persist for a long time, impact a wider range of users shall be identified and resolved by SI.</li><li>Monthly report on problem identified and resolved would be submitted to TNUHDB team along with the recommended resolution.</li></ol><ol><li>Change and Version Control</li></ol><p>All planned or emergency changes to any component of the system shall be through the approved Change Management process. The SI needs to follow all such processes (based on industry ITSM framework). For any change, SI shall ensure:</p><p>Detailed impact analysis</p><ol><li>Change plan with Roll back plans</li><li>Appropriate communication on change required has taken place</li><li>Proper approvals have been received</li><li>Schedules have been adjusted to minimize impact on the production environment</li><li>All associated documentations are updated post stabilization of the change</li><li>Version control maintained for software changes</li><li>The SI shall define the Software Change Management and Version control process. For any changes to the solution, SI must prepare detailed documentation including proposed changes, impact to the system in terms of functional outcomes/additional features added to the system etc. SI shall ensure that software and hardware version control is done for entire duration of SI&rsquo;s contract.</li></ol><ol><li>Maintain configuration information</li></ol><ol><li>SI shall maintain version control and configuration information for application software and any system documentation.</li></ol><ol><li>Training</li></ol><ol><li>SI shall provide training to TNUHDB officials, staff whenever there is any change in the functionality. Training plan must be mutually decided with TNUHDB team.</li></ol><ol><li>Maintain System documentation</li></ol><ol><li>SI shall maintain at least the following minimum documents with respect to the TNUHDB information portal and Digitalization systems:<ol><li>High level design of whole system</li><li>Low Level design for whole system / Module design level</li><li>System requirements Specifications (SRS)</li><li>Any other explanatory notes about system</li><li>Traceability matrix</li><li>Compilation environment</li></ol></li><li>SI shall also ensure updating of documentation of software system ensuring that:</li></ol><ol><li>Source code is documented</li><li>Functional specifications are documented</li><li>Application documentation is updated to reflect on-going maintenance and enhancements including FRS and SRS, in accordance with the defined standards</li><li>User manuals and training manuals are updated to reflect on-going changes/enhancements</li><li>Standard practices are adopted and followed in respect of version control and management.</li></ol><ol><li>All the project documents need to follow version control mechanism. SI will be required to keep all project documentation updated and should ensure in case of any change, the project documents are updated and submitted to TNUHDB by the end of next quarter.</li><li>Any software changes required due to problems/bugs in the developed software/application will not be considered under change control. The SI will have to modify the software/application free of cost. This may lead to enhancements/customizations and the same needs to be implemented by the SI at no extra cost.</li><li>Any additional changes required would follow the Change Control Procedure. TNUHDB may engage an independent agency to validate the estimates submitted by the SI.<ol><li><ol><li>IT Infrastructure Support and Maintenance</li></ol></li></ol></li></ol><p>IT infrastructure includes servers, networking, load balancers, video walls, laptop/desktop, security equipment, operating systems, enterprise monitoring system, help desk system and other related IT infrastructure required for running and operating the envisaged system. SI shall define, develop, implement, and adhere to IT Service Management (ITSM) processes aligned to ITIL framework for all the IT Services defined and managed as part of this project. IT infrastructure support and maintenance include but not limited to the below:</p><p><strong>Warranty support for deployed IT infrastructure</strong></p><ol><li>SI shall provide comprehensive and on-site warranty during the operation and maintenance period from the date of Go-Live for the IT infrastructure deployed on the project. SI need to have OEM support for these components and documentation in this regard need to be submitted to TNUHDB on annual basis.</li><li>SI shall provide the comprehensive &amp; onsite manufacturer&#39;s warranty in respect of proper design, quality and workmanship of all hardware, equipment, accessories etc. covered by the RFP. SI must warrant all hardware, equipment, accessories, spare parts, software etc. procured and implemented as per this RFP against any manufacturing defects during the warranty period.</li><li>SI shall provide the performance warranty in respect of performance of the installed hardware and software to meet the performance requirements and service levels.</li><li>SI is responsible for sizing and procuring the necessary hardware and software licenses as per the performance requirements. During the warranty period SI shall replace or augment or procure higher-level new equipment or additional licenses/hardware at no additional cost to the TNUHDB in case the procured hardware or software is not enough or is undersized to meet the service levels and the project requirements.</li><li>Mean Time Between Failures (MTBF) - If during contract period, any equipment has a hardware failure on four or more occasions in a period of less than three months or six times in a period of less than twelve months, it shall be replaced by equivalent or higher-level new equipment by the SI at no cost to TNUHDB.</li><li>During the warranty period SI shall maintain the systems and repair/replace at the installed site, at no charge to TNUHDB, all defective components that are brought to the SI&#39;s notice.</li><li>In case any hard disk drive of any server, SAN, or client machine is replaced during warranty/AMC, the unserviceable HDD will be property of TNUHDB and will not be returned to SI.</li><li>The SI shall carry out Preventive Maintenance (PM), including cleaning of interior and exterior, of all hardware and testing for virus, if any, and should maintain proper records at each site for such PM. Failure to carry out such PM will be a breach of warranty and the warranty period will be extended by the period of delay in PM. The PM should be carried out at least once in six months as per checklist and for components agreed with TNUHDB.</li><li>The SI shall carry out Corrective Maintenance for maintenance/troubleshooting of supplied hardware/software and support infrastructure problem including network (active/passive) equipment, security, and rectification of the same. The SI shall also maintain complete documentation of problems, isolation, cause, and rectification procedures for building knowledge base for the known problems in centralized repository, accessible to TNUHDB team as well.</li><li>The SI shall monitor warranties to check adherence to preventive and repair maintenance terms and conditions.</li><li>The SI shall ensure that the warranty complies with the agreed technical standards, security requirements, operating procedures, and recovery procedures.</li><li>The SI shall have to stock and provide adequate onsite and offsite spare parts and spare component to ensure that the uptime commitment as per SLA is met.</li><li>The SI shall ensure that the onsite list of spares is assigned only for TNUHDB infrastructure and that this list of onsite spares is made available to TNUHDB and updated on monthly basis</li><li>Any component that is reported to be down on a given date should be either fully repaired or replaced by temporary substitute (of equivalent configuration) within the time frame indicated in the Service Level Agreement (SLA).</li><li>The SI shall introduce a comprehensive Assets Management process &amp; appropriate tool to manage the entire lifecycle of every component of TNUHDB Information Portal.</li><li>For Peripheral Equipment&rsquo;s<ol><li>The SI needs to ensure to provide support for all the support Equipment&rsquo;s. In case any of the device models, peripheral or software components becomes obsolete, the SI shall offer new item/model, software with the same make and or higher specification at no additional cost. The proposed devices/peripherals should comply with the STQC Guidelines and shall be offered to the department for evaluation and acceptance. The SI shall provide technical document and manpower support to enable the department in evaluation process.</li></ol></li></ol><ol><li><ol><li>The SI shall ensure stock maintained is enough to ensure timely replacement of faulty devices within the defined SLA. In case of any delay in the repair/ replacement of respective device, a penalty shall be imposed on the SI for each incident. SI shall be required to certify such availability of the stock of Network devices in good and running conditions on monthly basis to TNUHDB department.</li><li>The SI shall perform Preventive Maintenance of all equipment supplied on quarterly basis for up keeping proper functioning of the devices/items supplied under the present agreement and certify that all the Network devices are found to be tamper proof and comply with specifications and requirements of the scope of the RFP. The department officials shall counter sign all the certificates/reports.</li><li>The SI may have to deploy additional manpower for smooth functioning of the project and at no extra cost to meet the SLA&rsquo;s</li><li>The SI shall be responsible for Fixing bugs/ issues, functionality enhancements, patches to cater changes (including tax, legal, statutory and policy requirements), modification or enhancement to existing business processes, changes to organizational structure, configurations, and customizations.</li><li>The SI shall ensure the availability of the technical support from the OEM for all peripheral equipment which includes &ndash; Network devices, Video wall Network Setup Devices throughout the period of contract.</li></ol></li></ol><p>Maintenance of IT Infrastructure:</p><ol><li>Management of Servers, Network Infrastructure, Experience Centre, and Kiosk</li></ol><ol><li>SI need to deploy requisite mix of L1, L2 and L3 resources (on 24X7 basis) for management of entire TNUHDB Systems including IT infrastructure deployed at Experience Centre, NOC</li><li>In its technical bid SI need to provide details of its team deployed at each site along with the category/roles and number of resources planned (with SI and outside), experience and skills, to be deployed at each site.</li><li>All the L1 and L2 resources proposed for the project need to be dedicated for the TNUHDB project.</li><li>TNUHDB may ask for security verification (Police verification) of every resource deployed on the project and SI need to comply the same before deployment of the resource at the project.</li><li>At all times, the SI need to maintain the details of resources deployed for the project to TNUHDB and keep the same updated. A detailed process in this regard will be finalized between TNUHDB and SI. The SI shall maintain an attendance register for the resources deployed Attendance details of the resources deployed also need to be shared with TNUHDB on monthly basis. TNUHDB reserves the right to interview resources deployed for Operations and maintenance and assess the suitability of the resource for the role. In case a resource is not found suitable, SI will change the resource on request of TNUHDB. SI shall comply with this.</li><li>The dedicated team for TNUHDB shall be based at the Head Office of TNUHDB. The shared team of senior resources may operate out of SI&rsquo;s remote delivery centres or any other office. The SI shall provide all such estimations to TNUHDB. In case of any travelling requirements of shared senior resources to DC/DR for TNUHDB, the same shall be at SI&rsquo;s expense. For any remote based support, the SI must ensure the same is done over a secured TNUHDB link. All accesses by any resources should be controlled, managed, and logged.</li><li>The scope of work for infrastructure and maintenance includes the following:<ol><li>DC/DR operations to be in compliance with industry leading ITSM frameworks like ITIL, ISO 20000 &amp; ISO 27001</li><li>Ensure compliance to relevant SLA&rsquo;s and KPI&rsquo;s</li><li>24x7 monitoring &amp; management of availability &amp; security of the infrastructure and assets</li><li>Perform regular hardening, patch management, testing and installation of software updates issued by OEM/vendors from time to time after following agreed process</li><li>Daily maintenance of system configuration</li><li>Day-to-day disk space management</li><li>Tracking the servers&rsquo; performance taking remedial and preventive actions in case of problems</li><li>Proper upkeep of storage media for taking backups</li><li>Ensure overall security &ndash; ensure installation and management of every security component at every layer including physical security</li><li>Prepare documentation/policies required for certifications included in the scope of work</li><li>Preventive maintenance plan for every quarter</li><li>Performance tuning of system as required</li><li>Design and maintain Policies and Standard Operating Procedures</li><li>User access management</li><li>Other activities as defined/to meet the project objectives</li><li>Implementation and maintenance of standard operating procedures for the maintenance of the IT infrastructure</li><li>Updation of all Documentation.</li></ol></li><li>During operations phase the SI needs to submit proof of renewal of support for all IT infrastructure products and other system software&rsquo;s for whom it is mandated to have OEM support. This needs to be submitted on an annual basis and needs to be verified before release of 2nd quarter payment of each year.</li><li>SI shall be responsible for managing the usernames, roles, and passwords of all the relevant subsystems, including, but not limited to servers, other devices, etc. SI shall be required to set up the directory server or use the existing directory server. Logs relating to access of system by administrators shall also be kept and shall be made available to TNUHDB on need basis.</li><li>SI shall implement a password change mechanism in accordance with the security policy formulated in discussion with TNUHDB and based on the industry best practices/frameworks like ISO 27001, ISO 20000 etc.</li><li>The administrators shall also be required to have experience in latest technologies to provision the existing and applicable infrastructure on a requirement-based scenario.</li></ol><ol><li><strong>System </strong><strong>Administration</strong></li></ol><ol><li>24*7*365 monitoring and management of the Network Devices &amp; other IT Infrastructure.</li><li>SI shall also ensure proper configuration of server parameters and performance tuning on regular basis. SI shall be the single point of accountability for all hardware maintenance and support the ICT infrastructure. It should be noted that the activities performed by the SI may be reviewed by TNUHDB.</li><li>SI shall be responsible for operating system administration, including but not limited to management of users, processes, preventive maintenance, and management of upgrades including updates, upgrades, and patches to ensure that the system is properly updated.</li><li>SI shall also be responsible for installation and re-installation of the hardware(s) as well as the software(s) in the event of system crash/failures.</li><li>SI shall also be responsible for proactive monitoring of the applications hosted</li><li>SI shall appoint system administrators to regularly monitor and maintain a log of the monitoring of servers to always ensure their availability to TNUHDB.</li><li>TNUHDB shall undertake regular analysis of events and logs generated in all the sub systems including but not limited to servers, operating systems, and others. The system administrators shall undertake actions in accordance with the results of the log analysis. The system administrators shall also ensure that the logs are backed up and truncated at regular intervals. SI shall refer to CERT-In Guidelines to ensure their alignment with the practices followed.</li><li>The system administrators shall adopt a defined process for change and configuration management in the areas including, but not limited to, changes in servers, operating system, applying patches, etc.</li><li>The system administrators shall provide hardening of servers in line with the defined security policies. Validation of hardening configuration will be carried out quarterly and deviations must be tracked through SLA reporting</li><li>The system administrators shall provide integration and user support on all supported servers, data storage systems, and others.</li><li>The system administrators shall provide directory services such as local LDAP services and DNS services and user support on all supported servers, data storage systems etc.</li><li>The system administrators shall be required to trouble shoot problems with web services, application software, server relationship issues and overall aspects of a server environment like managing and monitoring server configuration, performance and activity of all servers.</li><li>The system administrators should be responsible for documentation regarding configuration of all servers, IT Infrastructure etc.</li><li>The system administrators shall be responsible for managing the trouble tickets, diagnosis of the problems, reporting, managing escalation, and ensuring rectification of server problems as per SLA defined in appropriate section</li><li>The administrators will also be required to have experience in latest technologies so as to provision the existing and applicable infrastructure on a requirement-based scenario.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Network monitoring</strong></li></ol><ol><li>SI shall provide services for management of network environment to maintain performance at optimum levels on a 24 x 7 basis. It should be noted that the activities performed by the SI may be reviewed by TNUHDB.</li><li>SI shall be responsible for monitoring and administering the network at TNUHDB Head office and at Remote offices.</li><li>SI shall design of Network Administration or monitoring Policy and getting it approved from TNUHDB for effective and efficient management of Network resources. Network Administration, consists broadly of the following activities:<ol><li>Network devices&rsquo; configuration, management and tuning for optimum performance</li><li>Tracking the network status, Availability and taking remedial and preventive actions in case of problems.</li><li>Network fault isolation and resolution</li><li>Monitoring of network performance and escalation of performance deterioration to concerned authorities and taking remedial actions to resolve such issues.</li><li>Real time monitoring and deployment of network security measures 24*7*365</li><li>Documentation related to network configuration, routing policies, IP addressing schema etc.</li><li>Bandwidth monitoring and trending for the network</li></ol></li><li>SI shall be responsible for creating and modifying VLAN, assignment of ports to appropriate applications and segmentation of traffic.</li></ol><p>&nbsp;</p><ol><li><strong>Security Management</strong></li></ol><p>The SI shall be responsible for implementing measures to ensure complete security of the TNUHDB Project solutions (including its entire environment) and confidentiality of the related data, in conformance with the security policy of GoTN/GoI/any other policy.</p><p>The SI shall constantly monitor the TNUHDB systems for events or activities, which might compromise (fraudulently or accidentally) the confidentiality, integrity, availability, and security of the system and take necessary remedial and preventive measures. This monitoring shall be through the security controls including:</p><ol><li>Real-time intrusion detection tools</li><li>Audit review tools</li><li>Manual processes</li></ol><p>The SI shall have to ensure the following:</p><ol><li>Regular hardening and patch management of components of the TNUHDB systems as agreed with TNUHDB</li><li>Performing security services on the components that are part of the TNUHDB environment as per security policy finalized with TNUHDB</li><li>IT Security Administration &ndash; Manage and monitor safety of information/data</li><li>Reporting security incidents and resolution of the same</li><li>Proactively monitor, manage, maintain &amp; administer all security devices and update engine, signatures, and patterns as applicable.</li><li>Managing and monitoring of anti-virus, anti-malware, phishing, and malware for managed resources.</li><li>Ensuring 100 percent antivirus coverage with patterns not old more than period agreed on any given system</li><li>Reporting security incidents and co-ordinate resolution</li><li>Monitoring centralized pattern distribution (live update) and scan for deficiencies</li><li>Maintaining secure domain policies</li><li>Secured IPsec/SSL/TLS based virtual private network (VPN) management</li><li>Performing firewall management and review of policies on at least quarterly basis during first year of O&amp;M and then after at least on half-yearly basis</li><li>Resolution of calls for security notifications, system alerts, vulnerabilities in hardware/software and alerting TNUHDB as appropriate</li><li>Performing patch management using software distribution tool for all security applications including content management system, antivirus, and VPN</li><li>Providing root cause analysis for all defined problems including hacking attempts</li><li>Monthly reporting on security breaches and attempts plus the action taken to thwart the same and providing the same to TNUHDB</li><li>Maintaining documentation of security component details including architecture diagram, policies, and configurations</li><li>Performing periodic review of security configurations for inconsistencies and redundancies against security policy</li><li>Performing periodic review of security policy and suggest improvements</li><li>Reviewing logs daily of significance such as abnormal traffic, unauthorized penetration attempts, any sign of potential vulnerability. Security alerts and responses. Proactive measures in the event a problem is detected</li><li>Policy management (firewall users, rules, hosts, access controls, daily adaptations)</li><li>Modifying security policy, routing table and protocols</li><li>Performing zone management (DMZ)</li><li>Sensitizing users to security issues through regular updates or alerts - periodic updates/Help TNUHDB issuance of mailers in this regard</li><li>Performing capacity management of security resources to meet business needs</li><li>Rapidly resolving every incident/problem within mutually agreed timelines</li><li>Testing and implementation of patches and upgrades</li><li>Network/device hardening procedure as per security guidelines from TNUHDB</li><li>Implementing and maintaining security rules</li><li>Performing any other day-to-day administration and support activities</li><li>Maintaining strict privacy and confidentiality of all the data it gets access to. Adequate provisions to be made not to allow unrestricted access to the data. The SI shall not give access to data to people in the organization who have not signed the NDA. SI cannot sell or part with any data in any form</li><li>Producing and maintaining system audit logs on the system for a period agreed by the SI and TNUHDB, at which point they will be archived and stored at an off-site location or as desired by TNUHDB. The SI shall regularly review the audit logs for relevant security exceptions.</li></ol><ol><li><strong>OEM Support Services</strong></li></ol><p>Involving the OEMs of the critical components (hardware and software) to ensure that installations/ configurations/ integrations of the various components are performed according to the best practices/ OEM guidelines and seeking the professional support of the OEMs during any contingency is a key requirement</p><p>The SI shall ensure requisite support from the OEM for various aspects of project including configuration, customization, sizing, performance tuning and implementation support.</p><ol><li>The SI shall, before the commissioning of the system shall provide for teaming agreement between SI and the respective OEM which provides for professional support services of the OEM during the contract period.</li><li>The SI shall assess the requirement of professional services from OEMs for all components of the solution, and provision for requisite support from OEMs. The SI shall provision onsite professional services support including consulting services from the OEM or its consulting unit (for database, software, security, portal, reporting, BI, OS in the manner.</li><li>The SI shall facilitate bi-annual workshops with OEMs to discover, discuss, select, and implement best practices for OEMs products into the solution. Workshops will include review of existing configuration.</li><li>The SI shall ensure that there is 24x7 support from the OEMs of all the components which will be proposed by SI.</li><li>The SI shall give an un-priced break-up of the professional services support procured and its nature from the OEMs as part of the technical bid.</li><li>The SI shall take adequate steps to ensure that none of the IT Infrastructure proposed is declared &ldquo;End-of-Sale&rdquo; by the respective OEM in next 1 year as on date of submission of Bid or at any time during the contract. In case it happens, SI shall replace the component with equivalent or better component and ensure that there is no impact on the operations and performance.</li><li>The system software licenses mentioned in the Bill of Materials shall be genuine, perpetual, full use and should provide upgrades, patches, fixes, security patches and updates directly from the OEM. All the licenses and support (updates, patches, bug fixes, etc.) should be in the name of TNUHDB.</li><li>The SI shall warrant that the infrastructure procured for project have no defects arising from design or workmanship or any act of omission and must provide a declaration for the same from all the OEM for equipment that would be supplied at project site of TNUHDB. The warranty shall remain valid for at least one year beyond the service period of the contract for all hardware, software and other components comprising of the solution. The SI will ensure warranty in case of an extension.</li></ol><ol><li><strong>Other Activities</strong></li></ol><ol><li>SI shall ensure that it prepares configuration manual for OS, appliances, middleware, all tool, servers/devices and all equipment&rsquo;s and the same need to be submitted to TNUHDB, any changes in the configuration manual need to be approved by TNUHDB. Configuration manual to be updated periodically.</li><li>SI shall maintain data regarding entitlement for software upgrades, enhancements, refreshes, replacements, and maintenance.</li><li>If the Operating System or additional copies of Operating System are required to be installed/reinstalled/un-installed, the same should be done as part of O&amp;M.</li><li>SI should carry out any requisite adjustments/changes in the configuration for implementing different versions of Application Software.</li><li>Escalation and co-ordination with other vendors/sub vendors for problem resolution wherever required</li><li>Updates/Upgrades/New releases/new versions: The SI shall provide from time to time the Updates/Upgrades/new releases/new versions of the software and operating systems as required. The SI should provide free upgrades, updates &amp; patches of the software and tools to TNUHDB as and when released by OEM.</li><li>Whenever a component must be replaced because of technical, functional, manufacturing or any other problem, it shall be replaced with a component of the same make and configuration. In case the component of same make and configuration is not available, the replacement shall conform to open standards and shall be of a higher configuration specifically approved by TNUHDB.</li><li>SI shall provide patches to the software as part of IT infrastructure, operating system, databases, and other applications.</li><li>Software License Management: The SI shall provide for software license management and control. SI shall maintain data regarding entitlement for software updates, enhancements, refreshes, replacements, and maintenance.</li><li>Disaster Recovery management services</li><li>All other activities required to meet the project requirements and service levels.</li></ol><p>It is responsibility of the SI to scale up the Operations &amp; Maintenance (O&amp;M) team as and when required to ensure smooth project execution throughout the project duration.</p><p>&nbsp;</p><ol><li><ol><li><ol><li>Compliance to SLA</li></ol></li></ol></li></ol><p>&nbsp;</p><ol><li>Requirements</li></ol><p>SI shall ensure compliance to uptime and performance requirements of project solution as indicated in the SLA table of RFP and any upgrades/major changes to the TNUHDB Project shall be accordingly planned by SI for ensuring the SLA requirements.</p><ol><li>SLA Measurement</li></ol><p>SI shall be responsible for measurement of the SLAs at the TNUHDB System level as well as at the user level with the help of the enterprise monitoring tool on a periodic basis.</p><ol><li>Reporting</li></ol><p>Reports for SLA measurement must be produced TNUHDB officials as per the project requirements.</p><ol><li>Software Licenses</li></ol><p>Bidder to refer following list of software licenses which are indicative and may vary as per actual requirement. Bidder shall choose latest versions of software whichever is best fit for their requirement.</p><p>Bidder shall submit all licenses to TNUHDB in soft or paper format during handover</p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:37.75pt; width:35.75pt\"><p><strong>Sr No</strong></p></td><td style=\"background-color:#4472c4; height:37.75pt; width:198.45pt\"><p><strong>Software components </strong></p></td><td style=\"background-color:#4472c4; height:37.75pt; width:122.9pt\"><p><strong>Type of License </strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:37.75pt; width:110.4pt\"><p><strong>No of license</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.85pt; width:35.75pt\"><p><strong>1</strong></p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:198.45pt\"><p>Server OS e.g., Windows Servers, RHEL, Linux, any other as per requirement.</p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:27.05pt; vertical-align:top; width:35.75pt\"><p><strong>2</strong></p></td><td style=\"height:27.05pt; vertical-align:top; width:198.45pt\"><p>Workstation OS e.g., Windows 10/11, as per system requirement</p></td><td style=\"height:27.05pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:27.05pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:21.65pt; width:35.75pt\"><p><strong>3</strong></p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:198.45pt\"><p>Endpoint Security Agent/Antivirus</p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:27.95pt; vertical-align:top; width:35.75pt\"><p><strong>5</strong></p></td><td style=\"height:27.95pt; vertical-align:top; width:198.45pt\"><p>Enterprise Monitoring System Software</p></td><td style=\"height:27.95pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:27.95pt; vertical-align:top; width:110.4pt\"><p>10 end users</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:37.75pt; width:35.75pt\"><p><strong>7</strong></p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:198.45pt\"><p>Helpdesk Software for Tech Support &amp; Portal Support (Support team &amp; team leader/admin)</p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:28.85pt; vertical-align:top; width:35.75pt\"><p><strong>8</strong></p></td><td style=\"height:28.85pt; vertical-align:top; width:198.45pt\"><p>Load balancer, NIPS or any other security component</p></td><td style=\"height:28.85pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:28.85pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:27.05pt; width:35.75pt\"><p><strong>9</strong></p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:198.45pt\"><p>Network Management System Software</p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:12.65pt; vertical-align:top; width:35.75pt\"><p><strong>10</strong></p></td><td style=\"height:12.65pt; vertical-align:top; width:198.45pt\"><p>Citizen Web portal Application / TNUHDB Portal Application</p></td><td style=\"height:12.65pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:12.65pt; vertical-align:top; width:110.4pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:23.45pt; width:35.75pt\"><p><strong>11</strong></p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:198.45pt\"><p>Citizen Mobile Application/ NUHDB Mobile Application</p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:110.4pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:7.25pt; vertical-align:top; width:35.75pt\"><p><strong>12</strong></p></td><td style=\"height:7.25pt; vertical-align:top; width:198.45pt\"><p>BI &amp; Analytics Tool</p></td><td style=\"height:7.25pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:7.25pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:9.05pt; width:35.75pt\"><p><strong>13</strong></p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:198.45pt\"><p>GIS Mapping Tool</p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:18.5pt; vertical-align:top; width:35.75pt\"><p><strong>14</strong></p></td><td style=\"height:18.5pt; vertical-align:top; width:198.45pt\"><p>Project management System</p></td><td style=\"height:18.5pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:18.5pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:12.65pt; width:35.75pt\"><p><strong>15</strong></p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:198.45pt\"><p>Enterprise Resource Planning</p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:110.4pt\"><p>As required</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure VII - Governance Structure and Responsibility</strong></p><ol><li><ol><li><ol><li>Project Leadership Team</li></ol></li></ol></li></ol><p>The Project Leadership Team is the senior management team, which shall provide a tactical and strategic direction for the overall project. The team would discharge the following responsibilities:</p><ul><li>Ensuring commitment to the project is present at every level in the organization</li><li>Empower the Project In-charge/Project Director for management of all the operations related to the project</li><li>Issuing of circulars, instructions, etc. to effect changes to existing roles and responsibilities of employees, the adoption of reengineered processes in participating divisions / constituent organizations and such other matters as may be necessary from time to time</li><li>Ensuring the change in policy wherever required, if feasible</li><li>Ensuring that all the divisions and constituent organizations take active part in the project</li><li>Redefining/ refining the objectives, goals of the project</li><li>Ensuring the financial commitment to the project</li><li>Project monitoring and evaluation based on the inputs provided by the Project management group</li></ul><p>&nbsp;</p><ol><li><ol><li><ol><li>Project Implementation Committee (PIC)</li></ol></li></ol></li></ol><p>The PIC shall be responsible for ensuring the overall effectiveness of the implementation of the project and is the central repository for all status reporting to the leadership team. To achieve consistency and accuracy across the project, all implementation initiatives should comply with the project tracking and control requirements as may be defined by the PIC. The Project Management Consultant (PMC) shall be presenting the project progress to PIC.</p><p>&nbsp;</p><p>World Bank</p><p>As the Project In-charge responsible for the overall success of the project, the role in the successful implementation of the project includes discharging the following responsibilities:</p><ul><li>Setting overall policy, provide strategic guidance and leadership</li><li>Managing project administration and overall project issue &amp; risk management</li><li>Developing and maintaining a high-performance project culture</li><li>Intervene as appropriate to facilitate smooth progress of the project</li><li>Review of performance of the vendors and stakeholders and undertake corrective actions to achieve the project objectives</li><li>Coordinate with all the stakeholders and third-party agencies, vendors involved in the Project</li><li>Reporting project progress, successes, issues and risks to the leadership team and support in taking corrective actions, where necessary</li><li>Project communications management</li><li>Approve recommendations and action plans</li></ul><p>&nbsp;</p><p>PIC Team</p><p>&nbsp;</p><p>The PIC team comprises of the officers from the TNUHDB, Administration and IT Systems personnel. The key responsibilities of the PIC team are:</p><ul><li>Shall be responsible for ensuring the appropriate functionality and outcomes are achieved for the System and assisting with reviews and signoff of project deliverables</li><li>Shall be responsible for ensuring that the System and sub-systems developed under this project adhere to the technical standards and best practices during design, development, implementation and operations phase</li><li>Shall help in coordination with TNUHDB and other stakeholders for project implementation</li><li>Shall review and approve key project outputs</li><li>Shall assist in providing resources for development of project outputs</li><li>Shall be responsible for communicating between the top management and the project team members</li><li>Help in resolution of project issues</li><li>Monitor the effectiveness of the programs, incorporate the learnings, and redefine the change &amp; capacity building programs etc.</li><li>Shall review and certify the deliverables submitted in all the phases of the project acceptance testing and implementation</li><li>Shall also coordinate with other agencies to ensure smooth implementation/integration of the system</li><li>Responsible for guiding the team&rsquo;s activities concerning stakeholder management, communications, benefits realization, process improvement</li><li>Shall measure, monitor, and report the non-technical SLAs (e.g., turnaround time for implementation of Digitalization, TNUHDB Information Portal, and Mobile app. Monitor the solution performance, functionality, availability, identification of areas of improvements</li></ul><p>Project Coordination Team</p><ul><li>Shall arrange to send formal communication to TNUHDB and other stakeholders for their availability to discuss requirement discussion and operational challenges</li><li>Shall coordinate with PMC team on day-to-day basis to close monitoring of the project</li><li>Shall provide technical inputs for existing application and IT Infrastructure to PMC team</li><li>Shall review the project outputs and provide timely feedback and approval</li><li>Shall provide clarifications on queries raised by PMC</li><li>Shall review the project activities on daily and weekly/monthly basis</li></ul><p>&nbsp;</p><p>Project Management Consultant (PMC)</p><p>The PMC team will assist in Project Implementation, SLA Monitoring, review the performance of the application Solution, IT infrastructure requirements and review the SLA&rsquo;s between different stakeholders. The PMC will be responsible to perform the following tasks:</p><ol><li>Project Management<ol><li>Coordinate with project stakeholders during the implementation phase</li><li>Review the following development phase documentation submitted by System Integrators (SI)<ol><li>SRS</li><li>HLD</li></ol></li><li>Monitor the following development activities of the SI<ol><li>Design and development of solutions</li><li>Scanning and digitization activities</li><li>Deployment of hardware solution, network solution, hosting services, security features, etc.</li></ol></li><li>Assist the department in the User Acceptance Testing (UAT)</li><li>Identify implementation challenges, dependencies, and integration issues</li><li>Monitoring project implementation &amp; project work outputs timeline and Service Level Agreement (SLA)</li><li>Assistance in coordination with SI/vendor for Security Audit</li><li>Assist in planning and monitoring capacity building activities by assisting the departments in selection of training agency/ vendors as per need of the department.</li><li>Status Report and Monitoring</li><li>Preparing and submitting all progress reports, including quarterly reports, annual reports, and project completion report to the leadership team.</li></ol></li></ol><p>&nbsp;</p><p>Systems Integrator (SI)/ Vendor</p><p>The Implementation Agency/ Systems Integrator (SI) will be responsible to perform the following tasks:</p><ul><li>System requirements study and system design</li><li>Scanning and Digitization of materials of TNUHDB</li><li>Design, Develop, Supply, Commission, Implement and Maintain TNUHDB Portal (web &amp; mobile) with the key solutions/modules as mentioned in Chapter 4 and from the existing TNUHDB website http://tnuhdb.gov.in/;</li><li>Design, Develop, Supply, Commission, Implement and Maintain Mobile application to make available required features of TNUHDB Information portal through the TNUHDB mobile application</li><li>Preparation of SRS, HLD, LLD, RTT, Unit Test cases</li><li>Drawing out specifications for DC and DR Infrastructure (specifications for required Hardware, Software &amp; Networking infrastructure) for hosting the TNUHDB Information Portal and Mobile Application at in house server room and/or cloud hosting platform</li><li>Commissioning of IT hardware &amp; network including LAN, DC and DR</li><li>Approval from third party agency for the application/security audit of the developed applications and infrastructure</li><li>Change Management Support including training of users for effectively using the system in each phase of implementation</li><li>Operations and Maintenance of the developed solution for a specified period from the date of Go-Live</li><li>Documentation of the project</li><li>Make available web-based tools to the department for Project Management and Monitoring during development and implementation period and web-based tools for Evaluation and SLA Monitoring during O&amp;M period.</li><li>Periodical update (after formatting and checking) of the correct data as provided by TNUHDB officials, to the portal and mobile applications</li><li>Establishment and management of Helpdesk Operations for TNUHDB Information Portal</li><li>Address the ongoing needs of Security Management including, Monitoring and Management of various devices / tools such as Firewall, SIEM Tool, Intrusion Prevention System, Content Filtering and URL Blocking, Virus Protection, Load Balancer, DMZs, VLANs, Proxy and vulnerability protection through implementation of proper patches and rules as per best practices</li><li>Development/Customization and implementation of Preparing and submitting all reports, including quarterly reports, annual reports, and project Status report</li><li>Maintain updated project documentation including but not limited to design documents, Technical &amp; User manuals for the entire solution</li><li>Exit management support at the end of O&amp;M period.</li></ul><p>&nbsp;</p><p>&nbsp;[Deloitte1]<strong>Comment received from World Bank</strong>: During previous discussion, we had provided options regarding the execution of civil work, furnishing of office, procurement of hardware, etc No indication in the Excel Sheet is made on these so we are not able to comment on whether these have been adequately addressed</p><p>&nbsp;</p><p><strong>Comment Addressed</strong>: Hence we have addressed this point and have added to the ToR</p><p>&nbsp;</p><p>&nbsp;[Deloitte2]<strong>World Bank Comments:</strong></p><p>However, we would like to emphasize that all infrastructure-related permissions, including those for LAN and WLAN, should be managed by the selected vendor with support from TNUHDB; we would like to recommend that this be added to the ToR. This will ensure that we adhere to the best technical standards and comply with all regulatory requirements without overburdening TNUHDB&#39;s internal resources<strong> </strong></p><p>&nbsp;</p><p><strong>Comment Addressed: </strong>The infrastructure related permissions to be managed by the vendor has been mentioned across the chapter: Objective and in sections Annexure-I to Annexure-IV of this ToR</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>"},{"id":"OP00260797","notice_type":"Request for Expression of Interest","noticedate":"01-Dec-2023","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2023-12-14T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Tajikistan","project_id":"P171382","project_name":"Tajikistan Digital Foundations Project","bid_reference_no":"TDFP/CS/CQS-07","bid_description":"Development of Terms of Reference for procurement of ICT equipment and supervision of its installation for SUE \"Smart City\" Data Center","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"3, Academic Rajabovs ave, Dushanbe","contact_ctry_name":"Tajikistan","contact_email":"j.sattorzoda@piumof.tj","contact_name":"Jamshed Sattorzoda","contact_organization":"STATE INSTITUTION \"Project Implementation Unit for Access to Green and Rural Development Finance\"","contact_phone_no":"992372216184","contact_web_url":"www.minfin.tj","submission_date":"2023-12-01T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>Tajikistan</p><p>TAJIKISTAN DIGITAL FOUNDATIONS PROJECT</p><p>Loan No./Credit No./ <u>Grant No</u>.: P171382</p><p>Assignment Title: Consultancy services to develop Terms of Reference for Procurement of ICT equipment and supervision of its installation for SUE &ldquo;Smart City&rdquo; Data Centre</p><p>Reference No. (as per Procurement Plan): TDFP/CS/CQS-07</p><p>The Ministry of Finance of the Republic of Tajikistan has received project preparation advance (PPA) out of the WBG Project Preparation Facility for the preparation of the Tajikistan Digital Foundation Project, and intends to apply part of the proceeds toward payments under the consultancy contract to develop Terms of Reference for Procurement of ICT equipment and supervision of its installation for SUE &ldquo;Smart City&rdquo; Data Centre.</p><p>The objectives of this assignment are the following:</p><ol><li>Audit of existing data centers, server rooms and other data hosting infrastructures in the public sector in the Republic of Tajikistan;</li><li>Identification of the primary data center and the disaster recovery site that will be used to host information systems and digital services developed under the Tajikistan Digital Foundations project;</li><li>Development of a plan for the modernization of the primary and disaster recovery data center and TORs for the purchase of equipment, software and services necessary to upgrade the infrastructure of the primary and disaster recovery site, in accordance with project needs;</li><li>Supervision of installation and commissioning of equipment.</li></ol><p>The qualified consulting (herein after referred to as &ndash; the Consultant) is expected to conduct the following activities. The list of specific tasks of the consultant includes the following:</p><ol><li><strong>Audit of existing data centers and identification of the primary data center and disaster recovery sites</strong></li></ol><p>For each of the data center(s) included in the short list (designed in accordance with point b. of the General requirements), the Consultant will conduct a detailed audit to assess their suitability. The audit will consider, among other things, the following aspects:</p><ol><li>Physical Infrastructure: Inspect the physical infrastructure, including building integrity, power, cooling systems, fire suppression, physical security measures, and facility maintenance levels.</li><li>Capacity Analysis: Estimate the total capacity of each facility, including floor space, rack space, power supplies, cooling, and how they can be utilized.</li><li>Network Infrastructure: An overview of network infrastructure to understand connectivity, throughput, latency, reliability, redundancy, and network security measures.</li><li>Hardware: Detailed inventory and condition Assess IT hardware, including servers, storage devices, network devices, and more.</li><li>Software: An audit of software used in hosting environments, including operating systems, database management systems, virtualization platforms, and other application software and the associated licenses.</li><li>Performance: Performance evaluation including uptime, speed, latency, and other relevant parameters.</li><li>Resiliency and Redundancy: An overview of available resiliency and redundancy measures, including redundant power, network redundancy, hardware redundancy, and data backup systems.</li><li>Physical and cyber security: A comprehensive Assess physical and cyber security measures to protect data and infrastructure.</li><li>Operational efficiency: Evaluation of operational efficiency measures, including energy efficiency, workload management, staffing, availability of network/system operations centers and support services&nbsp; &nbsp; <strong>2.</strong>&nbsp;<strong>Prepare the ToRs for a system integrator;&nbsp;</strong><strong>Preliminary work</strong></li></ol><p>When developing TOR for a system integrator for a data center, the consultant must develop the requirements for the infrastructure, equipment, software, and systems of the primary and disaster recovery data center(s). This includes, but is not limited to, the following aspects:</p><ol><li>Describe the current state of the data center: Determine the current state of the data center, its architecture, cooling and power systems, network infrastructure, security, and other key aspects.</li><li>Goals and requirements: Definition of goals and requirements shall be achieved, through equipping and refining the data center.</li><li>Determine the goals of the project and its contribution to the overall strategy of the organization.</li><li>Identify requirements for performance, fault tolerance, scalability, and security of the data center.</li><li>Determine the need to comply with Uptime Institute standards.</li><li>Determine requirements for energy efficiency, thermal load management and environmental sustainability.</li><li>Account for the requirements for high availability and continuity of data center systems.</li><li>Determine the need to comply with data protection and confidentiality requirements.</li><li>Determine requirements for monitoring, management and administration of the data center.</li><li>Develop requirements for infrastructure, hardware, software and data center systems.</li><li>Determine requirements for the budget, timing and resources of the project.</li><li>Identify the hardware components of the situational center (data display system, telecommunications system, video conferencing, sound systems and conference systems, interactive displays or interactive whiteboards, power supply and backup power supply system, access control system, integrated control systems.)</li><li>Identify the telecommunication system for the Situation Center (Internet and intranet, IP-telephony, telephony, video conferencing, communication channel with the automation system, video surveillance, etc.)</li><li><strong>Concept and architecture </strong></li><li>Develop the concept and architecture of the Tier III data center to meet the standards of the Uptime Institute.</li><li>Determine the required components, systems, and infrastructure for high availability and reliability.</li><li><strong>Infrastructure </strong></li><li>Cooling Systems: Determine cooling system requirements, including system type (e.g., direct, or indirect cooling), cooling capacity, energy efficiency and temperature control systems.</li><li>Power Systems: Determine requirements for power systems, including capacity, reliability (e.g., redundancy and back-up power), energy efficiency, load balancing, and monitoring systems.</li><li>Network Infrastructure: Define network infrastructure requirements, including bandwidth, reliability, network protocols, segmentation, and security.</li><li>Security systems: Determine requirements for security systems, including access control systems, video surveillance, fire safety, public address systems and alarms.</li><li><strong>Equipment and systems</strong></li><li>Server hardware: Determine server hardware requirements, including server types, processing power, memory, storage, and networking capabilities.</li><li>Storage: Determine storage requirements, including storage capacity, storage types, data redundancy, and scalability.</li><li>Network Equipment: Determine the requirements for network equipment, including switches, routers, firewalls, and other network devices.</li><li>Additional equipment: Determine requirements for additional equipment, such as backup systems, monitoring systems, control systems, and others.</li><li><strong>Software and licenses</strong></li><li>Operating Systems: Determine the requirements for the operating systems that will be used in the data center, including compatibility, licensing, and upgrades.</li><li>Management software: Determine software requirements for data center management, including monitoring systems, resource management, automation, and others.</li><li>Management software: Determine requirements for software for managing the Situation Center, including monitoring systems, resource management, automation, and others.</li><li><strong>Scalability and flexibility</strong></li><li>Scalability: Determine the scalability requirements for the data center infrastructure, including the ability to add new hardware and expand processing, storage and network capacity in the future and develop a data center scaling strategy to accommodate possible business growth and increased system load.</li><li>Flexibility and Adaptability: Determine infrastructure agility requirements to be ready for changes in technology, business needs, and customer requirements.</li><li><strong>Load distribution </strong></li><li>Define requirements for load balancing between servers, data storages and network equipment to ensure high availability and fault tolerance of the system.</li><li><strong>Redundancy</strong></li><li>Determine requirements for redundant components such as redundant power supplies, redundant cooling modules, redundant network switches, and other equipment to ensure continued operation of the data center in the event of a major component failure.</li><li><strong>Security and data protection</strong></li><li>Develop requirements for security and data protection, including physical security of the data center, protection against cyber-attacks and data backup.&nbsp;</li><li><strong>&nbsp; </strong></li><li><strong>Compliance and certification</strong></li><li>Tier III Standard: Determine the requirements for obtaining Tier III certification from the Uptime Institute, including compliance with data center design and construction standards, reliability, and availability.<strong>Monitoring and control</strong></li><li>System Monitoring: Determine requirements for monitoring systems, including monitoring of energy consumption, temperature, humidity, network traffic and other parameters.</li><li>Define mechanisms for monitoring and controlling the operation of the updated data center infrastructure, including performance tracking systems, collection of metrics, and regular data analysis</li><li>Resource Management: Define requirements for resource management systems, including management of servers, storage, network equipment, backups, and load balancing.</li><li><strong>Emergency planning and disaster recovery</strong></li><li>Emergency Planning: Determine requirements for emergency planning, including the Develop evacuation plans, fire drills, disaster recovery procedures, and backup systems.</li><li>Standby Power: Determine requirements for standby power systems, including standby power sources (e.g., generator sets), automatic transfer, and uninterruptible power systems (UPS).</li><li><strong>Network security</strong></li><li>External Threat Protection: Determine requirements for external threat protection systems, including traffic filtering, firewalls, intrusion detection systems (IDS) and intrusion prevention systems (IPS).</li><li>Insider Threat Protection: Determine requirements for insider threat protection systems, including access control, authentication and authorization systems, network segregation, and monitoring systems.</li><li><strong>Training and documentation </strong></li><li>Personnel Training: Determine personnel training requirements, including training on new equipment, control systems, safety procedures, and operational procedures.</li><li>Documentation: Define documentation requirements, including technical specifications, installation and operating instructions, network diagrams, service manuals, and backup procedures.</li></ol><ol><li><ol><li><strong>Prepare </strong><strong>the modernization plan</strong><strong> and</strong><strong> budget</strong></li></ol></li><li><strong>Cost </strong><strong>estimation</strong><strong> and budgeting</strong><ol><li><ol><li>Estimate the cost of equipping the Tier III data center, including a disaster recovery site, including the cost of equipment, infrastructure, construction, installation, and commissioning.</li><li>Develop project budget, determine financial constraints and align the project budget with the procurement plan.</li><li>Calculate life expectancy and forecast costs for maintenance, upgrades and replacement of equipment.</li></ol></li></ol></li><li><strong>Assess the economic</strong><strong> efficiency</strong></li></ol><ol><li>Evaluate the economic efficiency of a Tier III data center project, including the calculation of return on investment (ROI) and payback periods.</li><li>Perform a cost-benefit Analyze equipping a Tier III data center.</li></ol><ol><li><strong>Project implementation plan</strong></li></ol><ol><li>Develop a phased implementation plan for the modernization of the Tier III data center, and the disaster recovery site and define project stages, resources, deadlines, and responsibilities.</li><li>Determine a plan for the introduction of new equipment, including time frames, sequence of work, testing, including compliance with Uptime Institute requirements and integration with existing systems.</li><li>Establish control and reporting mechanisms during project implementation.</li><li>Identify and assess potential risks associated with data center refurbishment and develop strategies and plans to mitigate or manage them.</li></ol><ol><li><strong>Staffing and training </strong><strong>plan </strong></li></ol><ol><li>Determine the necessary personnel, skills, and knowledge required to operate the Tier III data center and the disaster recovery site.</li><li>Develop a staff training plan.</li></ol><ol><li><strong>Maintenance and support plan</strong></li></ol><ol><li>Develop a maintenance and support plan to support the operation of the Tier III data center after modernization.</li><li>Determine regular inspections, maintenance and contingency plans required to ensure continuous operation.</li></ol><ol><li><strong>Monitoring and management plan</strong></li></ol><ol><li>Define a monitoring and management system to monitor the operation of the Tier III data center, ensure high availability, and fault tolerance.</li><li>Establish metrics and indicators to evaluate the performance and quality of the data center.</li><li>Define a monitoring and management system to monitor the operation of the Situation Center, ensure high availability, and fault tolerance.</li></ol><ol><li><strong>Migration and integration plan</strong></li></ol><ol><li>Develop a migration and integration plan if the equipment and modification of the Tier III data center is carrying out on an existing infrastructure.</li><li>Determine the sequence of actions and risks associated with the transition to a new infrastructure.</li></ol><ol><li><strong>Social and environment plan</strong></li></ol><ol><li>Identify sociological factors that may influence the project.</li><li>Analyze the needs of users and employees, taking into account their preferences and expectations.</li><li>Develop strategies to ensure social satisfaction and acceptance of the project by stakeholders.</li><li>Assess the environmental impact of the project on the environment.</li><li>Identification of potential negative impacts such as energy consumption, emissions and waste disposal.</li><li>Develop strategies and measures to reduce the ecological footprint, including the use of energy efficient solutions, waste management and promotion of sustainable resource consumption.</li></ol><ol><li><strong>Energy efficiency plan</strong></li></ol><ol><li>Develop an energy efficiency plan, including energy optimization and consumption reduction.</li><li>Plan for implementation of energy-saving technologies and energy management systems to reduce operating costs and environmental impact.</li><li>Develop a strategy for introducing renewable energy sources into data center operations, such as solar or wind energy.</li><li>Identify opportunities for the use of alternative energy sources and assess their environmental and economic efficiency.</li><li>Develop a monitoring and reporting system for environmental indicators, including the measurement of energy consumption, emissions, and other environmental parameters.</li><li>Develop a procedure for regular analysis and reporting on environmental performance to optimize production processes and reduce the negative impact on the environment.<ol><li><strong>Support procurement </strong><strong>of equipment </strong><strong>and services</strong></li></ol></li></ol><ol><li><strong>Assist with preparation of procurement documentation</strong></li></ol><ol><li>Support PIC with preparation of relevant documentation for procurement, including requests for proposals (Request for Proposal, RFP) or requests for quotations RFQ (Request for Quotation), for suppliers.</li><li>Include technical specifications, warranty conditions, delivery conditions, company and proposed staff qualification and evaluation criteria, and other relevant details in the documentation.</li></ol><ol><li><strong>Support PIC during</strong><strong> the </strong><strong>evaluation</strong><strong> process</strong></li></ol><ol><li>Evaluate technical proposals from vendors based on their RFP/RFQ responses.</li><li>Analyze the technical offers, including compliance with requirements, price offers, quality of equipment and terms of delivery.</li><li>Evaluate the technical characteristics of the proposed equipment from each supplier and its compliance with the requirements.</li><li>Analyze the provision of guarantees and technical support by suppliers throughout the life cycle of equipment.</li><li>Verify suppliers&#39; qualifications and experience.</li><li>Suggest selection of the most suitable supplier(s) based on the results of the technical evaluation.<strong>1.5.Supervision of the installation and commissioning of equipment</strong></li></ol><p>One of the most important stages in the construction of the Data center and the Situation Center is supervision of the installation and commissioning of equipment. This stage is critical for the successful implementation of the project since the correct installation and correct commissioning of the equipment are the basis for its reliable and efficient operation. It includes the following main activities:</p><p><strong>1.Implementation of supervision and control process</strong></p><ol><li>Supervise the process of installation and commissioning of Tier III equipment to verify compliance of the work performed with the requirements of Uptime Institute standards.</li><li>Carry out regular inspections, quality checks, time control and coordination with the contractor of the completed stages of work.&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>2. Coordination of installation and commissioning plans</strong><ol><li>Discussing and agreeing with the contractor the details of installation and commissioning plans, including the sequence of operations, the use of tools and technical solutions.</li><li>Verification of compliance of plans with the requirements of Uptime Institute standards and further approval.</li></ol></li><li><strong>Coordination with other contractors</strong><ol><li>Ensure communication and coordination with other contractors that may be involved in the installation and commissioning process (for example, electricians, plumbers, refrigeration engineers).</li><li>Coordinate work schedules and ensuring consistency of actions between all project participants.</li></ol></li><li><strong>Quality control</strong><ol><li>Planning and conducting tests of equipment after installation and commissioning to verify its performance and compliance with requirements.</li><li>Check the functionality, performance, fault tolerance and security of the system as a whole.</li><li>Verify and control of compliance of the installation and commissioning of Tier III equipment with the norms and standards defined by the Uptime Institute.</li><li>Verify compliance with electrical safety, fire safety, power stability, cooling, and other relevant codes and regulations.</li><li>Participate in acceptance tests of Tier III equipment, carried out after installation and commissioning.</li><li>Assistance in testing, verifying the health, performance and security of the system, as well as assessing its compliance with the requirements of the Uptime Institute standards.</li></ol></li><li><strong>Final check and acceptance:</strong><ol><li>Carry out a final check of the work performed and comparing with the requirements and expectations of the project.</li><li>Organize the work acceptance procedure and confirmation of compliance of installation and commissioning with Uptime Institute standards.</li></ol></li><li><strong>Training and knowledge transfer</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1. Ensure the transfer of the necessary knowledge and documentation to the data center personnel&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;2. Support transfer of the project to the customer or operating company, including the provision of all necessary documentation, staff training and assistance during commissioning.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>7. Installation and commissioning documentation</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1. Develop complete and accurate documentation of the installation and commissioning of equipment, including reports on the work performed, test reports, certificates of conformity, technical specifications and other necessary documents.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 2. Develop a detailed report on the installation and commissioning of equipment, including a description of the work performed, resources used, timing and test results.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 3. Account for the requirements of Uptime Institute standards for documentation and its readiness for further use and archiving.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>8.</strong><strong>Evaluation of results and elimination of defects</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;1. Check the results of installation, commissioning of equipment, and assess their compliance with the requirements and expectations of the project.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;2. In case of detection of defects or inconsistencies, organize and control their elimination in accordance with established procedures.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>9.Change management and control </strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;1.Control and manage changes in the process of installation and commissioning of Tier III equipment.&nbsp; &nbsp; &nbsp;2. Record and track changes made to plans, specifications, or other documents, and to be ensure that they comply with project requirements and Uptime Institute standards.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;3.Evaluate the impact of changes on the schedule, budget and risks of the project, as well as make appropriate decisions and adjustments.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; <strong>10.</strong>&nbsp;<strong>Resource management</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1.Plan and manage the resources and materials needed to successfully completed the installation and commissioning of Tier III equipment.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 2.Ensure the availability of necessary components, spare parts, tools and equipment in accordance with work plans and the requirements of Uptime Institute standards.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 3.Monitor the use of resources and accounting for their spending in the process of performing work.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>1.6. Support during final</strong><strong> acceptance and project handover</strong></li></ol><p>The Consultant should take part, together with the specialists of the State Unitary Enterprise &quot;Smart City&quot;, as well as other representatives of the Government of the Republic, if necessary, in the activities related to the final acceptance and project handover, which will include the following activities:</p><ol><li>Preparation of documentation: The Consultant shall provide the State Commission with all necessary documentation, reports and protocols related to the carried out technical supervision activities. This includes performance verification reports, test results, and inspections of data center systems and equipment.</li><li>Participation in the Site Inspection: The Consultant must attend the Site Inspection conducted by the State Commission and provide objective information and explanations regarding the work performed and the site&#39;s compliance with project requirements and Uptime Institute standards.</li><li>Assistance in Testing: The Consultant shall facilitate the testing and inspection of data center systems and equipment in accordance with the requirements and procedures established by the State Commission. He shall provide the necessary advice and guidance on the conduct of the tests and ensure that they are carrying out correctly.</li><li>Provision of technical support: The Consultant shall provide technical support to the State Commission, answering questions, providing the necessary data and information about the work performed, systems and equipment of the data center. It shall also facilitate the identification and elimination of possible shortcomings or deviations from the design.</li><li>Ensuring Compliance with Standards: The Consultant shall ensure that the work performed complies with Uptime Institute standards and other accepted codes and regulations. He must provide evidence of the object&#39;s compliance with the requirements, as well as offer recommendations for improvement, if necessary.</li><li>Assistance in concluding the acceptance of the object: The Consultant shall actively cooperate with the State Commission and specialists of SUE &quot;Smart City&quot; in the process of concluding the acceptance of the object. He must provide the necessary information and documentation, maintain communication, and participate in the discussion and resolution of emerging issues and problems.</li></ol><p>The assignment duration including preparing the TOR, implementation plan and budget, supervision activities - 3 years or 36 months.</p><p>The detailed Terms of Reference (TOR) for the assignment can be obtained at the address given below.</p><p>The Project Implementation Unit under the State Institution &quot;CENTER FOR PROJECT IMPLEMENTATION AND ACCESS TO GREEN FINANCING AND RURAL DEVELOPMENT FINANCE&quot; now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>Qualification and experience</strong><strong> of the consultancy firm</strong></p><ol><li>Technical experience and expertise: Not less than 10 years of work experience in designing and technically&nbsp; supervising datacenters, out of which at least 3 (three) Tier 3 or Tier 4 data center design experiences for an IT Capacity of 1MW or more, with a total data center design experience (total of IT load capacities of data centers designed by the consultant) of 10MW or more; knowledge of relevant standards and recommendations, such as ANSI/TIA-942, Uptime Institute Tier Standard and / or others.</li><li>Proven ability to work with clients to understand their requirements and standards while designing a Tier 3 data centers (ability to translate client requirements into clear and specific technical specifications); ability to develop detailed technical solutions and offer the best options for equipping data centers to achieve the required level of reliability and availability.</li><li>Technical competences: Experience in writing technical specifications and terms of references for data infrastructure and related fields in an easily understandable manner; ability to consider project constraints, timelines, budget, and other factors (such modern technologies and best practices), when writing technical specifications and assignments.</li><li>Good knowledge of local regulatory environment would be desirable.</li><li>Communication and stakeholder engagement: Proven track record of effectively engaging with various entities, including government officials, engineers, developers, and management staff; strong writing skills with the ability to demonstrate accuracy, clarity, and logical consistency while drafting technical documents; solid team management and collaboration skills.</li><li>Ability to work under time constraints and pressure and being receptive of feedback.</li></ol><p><strong>Team Composition</strong></p><p>The consultant company may at its discretion, offer a list of specialists required to perform the services. The consultant may invite, as necessary, additional specialists to implement certain technical and organizational issues.</p><p>To perform the tasks specified in the Terms of Reference, the Consultant has the right to involve both local and international experts.</p><p>To carry out its activities, the consultant must hire at certain stages of the project such specialists as:</p><ol><li>Design Engineers</li><li>Network and communications engineers</li><li>Systems administration engineers</li><li>Power and Cooling Engineers</li><li>Monitoring and control engineers</li><li>System or Network Architects</li><li>Storage Engineers</li><li>IT architects</li><li>Training and Development Specialists</li><li>Data backup and recovery specialists</li><li>Access control and security specialists</li><li>Switching and Routing Specialists</li><li>Information security specialists</li><li>Software Quality Assurance Specialists</li><li>Data analysts</li></ol><p>In addition, the Consultant shall field any technical, non-technical and administrative staff to enable the timely delivery of the assignment and to the required standard.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the Framework Agreement arrangements described in the Procurement Regulations and to be specifically set out in the Request for Proposals.</p><p>Further information can be obtained at the address below during office hours 09:00 &ndash; 17:00.</p><p>Expressions of interest must be delivered in a written form to the e-mail&rsquo;s below by December 14, 2023, 5:00 p.m. local time.</p><p><strong>Attention: Umed Ziyoev, Lead Specialist of the Information and Communication Technologies Center of EOP</strong></p><p><strong>E-Mail: </strong><strong>z.umed@dip.tj</strong></p><p><strong>Cc: </strong><strong>katya.bobro@gmail.com</strong><strong> </strong></p><p>&nbsp;<strong> </strong></p>"},{"id":"OP00086177","notice_type":"Request for Expression of Interest","noticedate":"19-Mar-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-04-03T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Pacific Islands","project_id":"P147839","project_name":"Pacific Resilience Program","bid_reference_no":"FJ-SPC-157811-CS-QCBS","bid_description":"Impact Forecasting Consultancy","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Pacific Community Geosciences Division\nPrivate Mail Bag, GPO\nSuva, Fiji Islands","contact_ctry_name":"Fiji","contact_email":"georgeb@spc.int","contact_name":"George Beck","contact_organization":"Pacific Community","contact_phone_no":"+679 8010200","contact_web_url":"www.spc.int","submission_date":"2020-03-19T00:00:00Z","notice_text":"<p><strong>Pacific Resilience Programme (PREP)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<p><strong>Request For Expressions Of Interest - Consulting Services </strong></p>\n\n<p><strong>IMPACT-BASED FORECASTING CONSULTANCY</strong></p>\n\n<p><strong><em>Reference Number:</em></strong><strong><em> FJ-SPC-157811-CS-QCBS</em></strong></p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>This Request for Expressions of Interest follows the General Procurement Notice for this project that appeared in dgMarket online Oct 15, 2015.</li>\n\t<li>The Pacific Resilience Programme (PREP) is a series of projects funded by the World Bank and implemented at the regional and national level by the Pacific Community, Pacific Island Forum Secretariat and Samoa, Tonga, Marshall Islands and Vanuatu.</li>\n\t<li>The overall project development objective is to strengthen early warning, resilient investments and financial protection. One of the components of the project aims to strengthen multi-hazard spatial risk data including tools to strengthen early warning and preparedness in PICs. The activities under this component include i) acquisition of data ii) hazard modelling iii) development of spatial information to produce maps that would support nationally implemented Multi-Hazard Early Warning Systems (MHEWS).</li>\n\t<li>This assignment aims to develop operational hazard models for forecasting of impacts of extreme events including tropical cyclones and coastal inundation at sub-national level, which will be integrated into the nationally implemented PREP multi-hazard early warning systems in Tonga and Samoa.</li>\n\t<li>The consultancy will be contracted through a lumpsum contract for a period of 18 months inclusive of support, maintenance and training. The expected level of effort is 18 staff-months.</li>\n\t<li>The Terms of Reference for the Assignment are enclosed below.</li>\n\t<li>The <strong>SPC</strong> now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: &nbsp;</li>\n</ol>\n\n<ol>\n\t<li>Core business in forecasting and assessing coastal flooding risk including the influence of climate variability and climate change;</li>\n\t<li>Demonstrated relevant experience of at least 5 years in the following areas:\n\t<ul>\n\t\t<li>Developing innovative coastal inundation solutions including statistical, dynamical and hybrid downscaling techniques;</li>\n\t\t<li>Developing coastal flooding solution tailored to resources available in small island states.</li>\n\t\t<li>Developing operational hazard models for forecasting of impacts of extreme events including tropical cyclones, distant swells and tsunami;</li>\n\t\t<li>Developing open source solution (e.g. using python)</li>\n\t</ul>\n\t</li>\n\t<li>Demonstrated international collaborative experiences with renowned organization/ agencies in the field of coastal oceanography.</li>\n</ol>\n\n<p><u>Key Experts will not be evaluated at the shortlisting stage.</u></p>\n\n<ol>\n\t<li>Consultants may associate to enhance their qualifications. If Consultants wish to express interest as an Association, then they must clarify the nature of the proposed Association &ndash; i.e., whether it is a Joint Venture or a Sub-Consultancy. Please note in the case of a Joint Venture, the Consultants shall send information for each member, as a separate assessment will also be done for each firm in the proposed Joint Venture. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. Information about sub-consultants is not required and will not be taken into consideration.</li>\n\t<li>The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank&rsquo;s Guidelines: Selection and Employment of Consultants [under IBRD Loans and IDA Credits &amp; Grants] by World Bank Borrowers setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</li>\n\t<li>A Consultant will be selected in accordance with the Quality- and Cost-Based Selection (QCBS) method set out in the Consultant Guidelines which can be found at www.worldbank.org</li>\n\t<li><strong>Expressions of Interest, </strong>including documentary evidence on the above requirements shall be delivered in a written form to the address below by 1600 (Fiji Time) on <strong>3 April 2020. </strong>To facilitate evaluation, submissions shall not exceed <strong>20 pages</strong>. <u>CVs of experts are not required at this stage</u>. Expressions of Interest should be clearly marked <em>&ldquo;<strong>Expression of Interest for Consulting Services for</strong> <strong>IMPACT FORECASTING CONSULTANCY, REFERENCE NUMBER: FJ-SPC-157811-CS-QCBS</strong>&rdquo;<strong>.</strong></em></li>\n\t<li>Address for submission of Expression of Interest:</li>\n</ol>\n\n<p><strong>Attention</strong>: George Beck, PREP Programme Manager</p>\n\n<p><strong>Postal Address: </strong>Pacific Community, Private Mailbag, Suva, Fiji Islands</p>\n\n<p><strong>Street Address: </strong>Pacific Community, 241 Mead Road, Suva, Fiji Islands</p>\n\n<p><strong>Tel: </strong>(679) 3381377</p>\n\n<p><strong>Fax: </strong>(679) 3370040</p>\n\n<p><strong>E-mail: </strong>georgeb@spc.int</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>PACIFIC RESILIENCE PROGRAMME</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p><strong>Impact-Based Forecasting Consultancy</strong></p>\n\n<ol>\n\t<li>Background Information on the Project</li>\n</ol>\n\n<p>The Pacific Resilience Programme (PREP) is a series of projects funded by the World Bank and implemented at the regional and national level by the Pacific Community, Pacific Island Forum Secretariat and Samoa, Tonga, Marshall Islands and Vanuatu. The overall project development objective is to strengthen early warning, resilient investments and financial protection. One of the components of the project aims to strengthen multi-hazard spatial risk data including tools to strengthen early warning and preparedness in Pacific Island Countries. The activities under this component include i) acquisition of data ii) hazard modelling iii) development of spatial information to produce maps that would support nationally implemented Multi-Hazard Early Warning Systems (MHEWS). This activity specifically targets interventions in Tonga and Samoa to strengthen early warning systems and improve preparedness. Both countries are implementing national PREP projects focused on upgrading their multi-hazard early warning systems.</p>\n\n<ol>\n\t<li>Objective of the Assignment</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The objective of this consultancy is to develop operational hazard models for forecasting of impacts of extreme events including tropical cyclones and coastal inundation at sub-national level, which will be integrated into the nationally implemented PREP multi-hazard early warning systems in Tonga and Samoa. Such impact forecasting can be used to produce just-in-time maps of potentially affected areas. In addition, this activity will enhance the Service Delivery System under [1]Sub-Component 1.1.3.</p>\n\n<ol>\n\t<li>Scope of work</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The scope of services includes the following:</p>\n\n<ul>\n\t<li>Design and develop a demonstration forecast system for tropical cyclone driven inundation in Samoa and Tonga (to be incorporated into the MHEWS).</li>\n\t<li>Design and develop a demonstration forecast system for tsunamigenic earthquake driven inundation in Samoa and Tonga (to be incorporated into the MHEWS).</li>\n\t<li>Design and develop a seasonal inundation outlook in Samoa and Tonga (to be incorporated into the MHEWS).</li>\n\t<li>Design and develop an impact-based forecast system for swell driven inundation in Samoa and Tonga (to be incorporated into the MHEWS).</li>\n\t<li>Develop a real-time observation system to complement operational hazard models.</li>\n\t<li>Customise and test a platform to incorporate impact-based forecast for national and local applications.</li>\n\t<li>Provide in-country training on the use and operationalisation of impact-based forecast models.</li>\n\t<li>Provide advanced training to SPC on the development of the impact-based forecast system to ensure the sustainability of the system through long term regional support.</li>\n\t<li>Collaborate with the System Integrator Consultant (SIC) responsible for the MHEWS design and operationalisation in Tonga and Samoa.</li>\n</ul>\n\n<ol>\n\t<li>Description of Tasks</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 1</strong> - Desktop review of the various methodologies supporting the impact-based forecast systems being developed in the region will be undertaken.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 2</strong> - Consultation with key stakeholders in Tonga and Samoa.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 3</strong> - Establish a real-time and in-situ ocean wave observation system to monitor coastal hazards</p>\n\n<ul>\n\t<li>Investigate and identify sites for the real-time ocean observation system</li>\n\t<li>Support the development of Standard Operational Procedures (SOPs) for each site</li>\n\t<li>Identify suitable ocean wave monitoring devices to measure coastal hazard data.</li>\n\t<li>Deploy ocean monitoring devices at selected sites.</li>\n\t<li>Provide the Meteorological Service with an intuitive interface that supports validation and future improvement of the forecast against in-situ information.</li>\n\t<li>Develop local capacity to maintain and collect data from the ocean monitoring devices including data processing.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 4</strong> - Develop an open source swell inundation forecast system tailored to islands geomorphology and the resources available at the National Meteorological Services. Despite the fact that no High-Performance Computing (HPC) system is available at the national or regional level, the forecast, via a combination of numerical and statistical downscaling techniques, should provide project stakeholders with timely, accurate hazard information. Furthermore, the swell inundation forecast system should solely rely on freely available data and services (apart from internet, electricity, etc&hellip;).</p>\n\n<p>&nbsp;</p>\n\n<p>Swell driven inundation is a compound event influenced by meteorological, climatic and astronomical effect (e.g. wind setup, inverted barometric pressure, wave, sea level anomaly and tide). The swell inundation forecast system must include the following components:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Prediction of offshore wave, tide and sea level anomaly with a resolution carefully selected to account for processes inferred by surrounding bathymetry features (e.g. refraction).</li>\n</ol>\n\n<ul>\n\t<li>Development and analysis of a 40 years offshore wave hindcast dataset at country scale and at an appropriate resolution. The modelling of swells and wind seas (whole directional spectra) is highly desirable. The use of meta-models and machine learning models (unsupervised algorithms, supervised algorithms, analogue methods, classification and selection algorithms, neural networks) is highly encouraged as it will allow a fast and reliable forecast estimate of nearshore waves based on global wave forecasts.</li>\n\t<li>Validation of the wave hindcast with historical data (eg wave buoy and satellite altimetry data).</li>\n\t<li>Development of tidal prediction for all islands in Tonga and Samoa.</li>\n\t<li>Development a sea level anomaly forecast for Tonga and Samoa.</li>\n\t<li>Operationalisation of a 7-day offshore ocean state condition forecast including offshore water level and wave conditions.</li>\n\t<li>The contractor must provide experience in the development of meta-models (named also surrogate or hybrid models) for downscaling waves to nearshore areas.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Prediction of wave run-up and inundation depth accounting for relevant nearshore processes.&nbsp;</li>\n</ol>\n\n<ul>\n\t<li>Development of inundation models for islands in Samoa and Tonga with an emphasis on capital cities (must be assessed through a two dimensional high-resolution inundation model). The open source numerical model selected must account for relevant nearshore processes such as the generation of Infragravity wave on reef fronted shoreline.</li>\n\t<li>Validation of the inundation model with in-situ data and historical run-up information (from post disaster survey).</li>\n\t<li>Create a large database of synthetic offshore ocean conditions (wave and water level) based on hindcast data (multivariate extreme value analysis and montecarlo simulation).</li>\n\t<li>Development of a meta-modelling approach enabling the reconstruction of the resulting inundation from each synthetic offshore ocean condition scenario. Note that the strategy for selecting the set of scenarios to be pre-computed should ensure that meta-models can perform consistently well for all scenario types (normal, severe and extreme event).</li>\n\t<li>Cross validation of the meta-modelling approach against different number of preselected scenarios to assess uncertainties and adjust the optimum number of cases to be numerically simulated.</li>\n\t<li>The contractor must provide experience in the development of meta-models for estimating wave run-up.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Operationalisation and testing of the inundation forecast system.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 5</strong> - Develop an open source cyclone driven inundation forecast system tailored to coral island geomorphology and the resources available at the National Meteorological Services. As no High-Performance Computing (HPC) system is available at the national or regional level, the forecast should be based on pre-computed scenarios. Recent solution used for tropical cyclone driven inundation hazard assessment in Fiji (Mendez et al, 2018) and Vanuatu (Damlamian et al, 2019) could be further investigated. The development of a tropical cyclone inundation forecast system must include:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Prediction of tropical cyclone driven sea state</li>\n</ol>\n\n<ul>\n\t<li>Compilation of the historical tropical cyclones affecting Tonga and Samoa from 1970 onwards and documentation of their impacts.</li>\n\t<li>Development or use of a large database of synthetic cyclones (e.g. 10,000 years) for Tonga and Samoa based on historical data (stochastic modelling)</li>\n\t<li>Development of a cyclone wave and storm surge (if necessary) model for Samoa and Tonga. Model resolution must be selected carefully to ensure that cyclone wind fields are modelled adequately and wave propagation takes into account relevant bathymetry features (e.g. refraction).</li>\n\t<li>Validation of the cyclone wave and storm surge models against existing historical data, including observations from buoys, tidal gages and satellite.</li>\n\t<li>Development of a meta-modelling approach enabling the reconstruction of cyclone driven ocean state from each synthetic track. Note that the strategy for selecting the set of scenarios to be pre-computed should ensure that meta-models can perform consistently well for all scenario types (normal, severe and extreme event).</li>\n\t<li>Cross validation of the meta-modelling approach against different number of preselected scenarios to assess uncertainties and better adjust the optimum number of cases to be numerically simulated.</li>\n\t<li>Operationalization and testing of cyclone driven sea state forecast (wave and storm surge) based on the meta-modelling approach. While the meta-model may be based on a simplified representation of tropical cyclone tracks, the contractor must ensure that the designed forecast solution provides adequate ocean sea state prediction for realistic tropical cyclone.</li>\n\t<li>The contractor must provide experience in the development of meta-models for downscaling waves and surge induced by tropical cyclones to nearshore areas.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Prediction of wave run-up and inundation depth accounting for relevant nearshore processes.&nbsp;</li>\n</ol>\n\n<ul>\n\t<li>Create a large database of synthetic offshore ocean conditions (wave and water level) based on hindcast data (multivariate extreme value analysis and montecarlo simulation). This will encompass different population of waves and sea levels from those considered in task 4 which is tailored to distant swells.</li>\n\t<li>Development of a meta-modelling approach enabling the reconstruction of the resulting inundation from each synthetic offshore ocean condition scenario. Note that the strategy for selecting the set of scenarios to be pre-computed should ensure that meta-models can perform consistently well for all scenario types (normal, severe and extreme event).</li>\n\t<li>Cross validation of the meta-modelling approach against different number of preselected scenarios to assess uncertainties and adjust the optimum number of cases to be numerically simulated.</li>\n\t<li>The contractor must provide experience in the development of meta-models for estimating wave run-up.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Operationalisation and testing of the inundation forecast system.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 6</strong> - Develop an open source tsunamigenic earthquake driven inundation forecast system tailored to the resources available at the National Meteorological Services. As no High Performance Computing (HPC) system is available at the national or regional level, the forecast could be based on pre-computed scenarios sourced from the recent database produced as part of the 2018 Australian Probabilistic Tsunami Hazard (https://github.com/GeoscienceAustralia/ptha). The development of a tsunami inundation forecast system should include:</p>\n\n<ul>\n\t<li>Development of a tsunami inundation model for Tonga and Samoa based on open source solution.</li>\n\t<li>Validation of the tsunami model using historical tide gauge data and existing run-up information.</li>\n\t<li>Development or use of existing database such as the PTHA 2018 (Davies, 2018) to analyse all possible tsunamigenic earthquake scenarios relevant for Tonga and Samoa (e.g. local and far-field sources)</li>\n\t<li>Operationalisation and testing of the tsunami inundation forecast system via the development of meta-models. Note that the strategy for selecting the set of scenarios to be pre-computed should ensure that meta-models can perform consistently well for all scenario types (normal, severe and extreme event). Additionally, for local tsunami, the contractor will ensure the forecast system design accounts for co-seismic vertical displacement while also investigating the need to consider complex rupture mechanism to increase system performance.</li>\n\t<li>The contractor must provide experience in the development of meta-models for estimating wave run-up based on multivariate variables.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 7</strong> &ndash; Integrate the hazard forecasts into an impact-based forecasting solution. The hazard information combined with existing exposure data will be used to produce actionable, impact-based information. The contractor will work closely with project stakeholders such as Tonga and Samoa Meteorological Offices to ensure the impact information is tailored to each country&rsquo;s perception of asset value and cultural background. Furthermore, the impact-based forecast solution will be tested using existing post disaster survey data (e.g. 2018 TC Gita).</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 8</strong> &ndash; Seasonal inundation outlook.</p>\n\n<p>The probability of inundation from swell and tropical cyclone will be statistically analyzed in relation to annual and monthly regional predictors in order to automate the generation of seasonal inundation outlook. This task will include:</p>\n\n<ul>\n\t<li>Analysis of current operational seasonal forecasting products such the CFSv2 (NOAA) and EUROSIP (ECMWF) performance and skills to seasonally forecast major climate drivers of swell (e.g. extratropical storm activity in the Southern Ocean) and tropical cyclones (e.g. sea surface temperature or Maximum Tropical Cyclone Intensity) in the South Pacific.</li>\n\t<li>Investigation of the degree of applicability to forecast coastal inundation in the target areas based on an analysis of the past conditions.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>If demonstrated useful, operationalize the seasonal inundation outlook to systematically produce reports tailored to the relevant stakeholders</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 9</strong> &ndash; Risk assessment.</p>\n\n<p>Risk knowledge is a pillar of an effective early warning system. As such the contractor will be required to capitalize on the methodology developed and knowledge built from the tasks above to produce probabilistic inundation maps and risk information for all inundation sites.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 10</strong> - Integrate and operationalize impact-based forecast system and real time ocean observation in Tonga and Samoa (including training in Tonga and Samoa).</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Task 11</strong> - Knowledge transfer:</p>\n\n<p>The contractor will work closely with project stakeholder and hold a series of workshop to ensure:</p>\n\n<ul>\n\t<li>The system&rsquo;s user interface and forecast product is tailored to the stakeholder needs.</li>\n\t<li>The system&rsquo;s governing principles (e.g. meta-model) is well understood by the stakeholders.</li>\n\t<li>The long-term sustainability of the tools by providing the basic maintenance principles and architecture of the system. And advanced training to SPC.</li>\n\t<li>Standard Operational Procedures (SOPs) pertaining the ocean monitoring station(s) are in place.</li>\n</ul>\n\n<ol>\n\t<li>Expected Outputs</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>This project will provide a significant contribution to the regional effort to implement impact-based forecast in Pacific Island countries. SPC is leading the development of inundation forecast system in the region, with two current World Meteorological Office (WMO) implemented projects; the Coastal Inundation Forecast Demonstration Project (CIFDP) in Fiji and the Climate Risk and Early Warning System (CREWS) project in Tuvalu and Kiribati. Additionally, within the next couple of years, SPC will be investigating the strengthening of the inundation forecast product for Majuro as part of the PREP2 project.</p>\n\n<p>&nbsp;</p>\n\n<p>Through this project, the following hazard forecasting tools/models will be developed for Tonga and Samoa:</p>\n\n<ul>\n\t<li>Tropical cyclone wind driven inundation (high impact, relatively high likelihood)</li>\n\t<li>Tsunami inundation (high impact, low likelihood)</li>\n\t<li>Swell inundation (moderate to low impact, high likelihood)\n\t<ol>\n\t\t<li><em>Deliverables</em></li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The assignment will be contracted as a Lump Sum Contract and payments will be done as per the schedule against of the Deliverables/Reports listed below. Payments for deliverables will be made on the basis of Client acceptance of the deliverable, not on submission.</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:71.65pt\">\n\t\t\t<p><strong>Due</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:66.5pt\">\n\t\t\t<p><strong>Payment Milestone</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Inception Report including work plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:71.65pt\">\n\t\t\t<p>Day 30</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:66.5pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:10.3pt; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Stakeholder consultation report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.3pt; vertical-align:top; width:71.65pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Day 60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.3pt; vertical-align:top; width:66.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Concept Design Report including system architecture</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:71.65pt\">\n\t\t\t<p>Day 70</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:66.5pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Ocean observation system designed and equipment deployed</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:71.65pt\">\n\t\t\t<p>Day 120</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:66.5pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:90.4pt; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Development Outputs:</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Develop an open source inundation seasonal outlook</li>\n\t\t\t\t<li>Develop an open source swell inundation forecast system</li>\n\t\t\t\t<li>Develop an open source cyclone driven inundation forecast system</li>\n\t\t\t\t<li>Develop an open source tsunami driven inundation forecast system</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:90.4pt; vertical-align:top; width:71.65pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Day 210</p>\n\n\t\t\t<p>Day 270</p>\n\n\t\t\t<p>Day 330</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Day 360</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:90.4pt; vertical-align:top; width:66.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>10%</p>\n\n\t\t\t<p>10%</p>\n\n\t\t\t<p>10%</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>10%</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Integrate and operationalize impact-based forecast system and real-time ocean observation in Tonga and Samoa.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:71.65pt\">\n\t\t\t<p>Day 390</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:66.5pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:312.65pt\">\n\t\t\t<p>Final Report including maintenance plan, manuals and training</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:71.65pt\">\n\t\t\t<p>Day 420</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:66.5pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li>Expected Key Experts</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Qualification Requirements of the Consultant</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The firm will need to demonstrate that they are an internationally focused firm with proven track record (through technical reports and at least 50 publications in internationally recognized peer reviewed scientific journals) in developing innovative coastal inundation solutions and experience in impact-based forecasting, as well in the application of Data Science and Climate in Coastal Engineering.</p>\n\n<p>&nbsp;</p>\n\n<p>It is expected that the Consultant team will comprise of a combination of key and non-key experts in order to fulfil this assignment. Key experts are expected to include:</p>\n\n<ol>\n\t<li>K1 - Team Leader;</li>\n\t<li>K2 - Oceanographer;</li>\n\t<li>K3 - Numerical Modeller;</li>\n\t<li>K4 - Physical Oceanographer;</li>\n\t<li>K5 - System Developer; and</li>\n\t<li>K6 &ndash; Trainer.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Table &ndash; Minimum Requirements of Consultancy Team Members</strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:474.65pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-color:black; height:28.0pt; width:105.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9d9d9; border-color:black; height:28.0pt; width:106.3pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9d9d9; border-color:black; height:28.0pt; width:262.95pt\">\n\t\t\t<p><strong>Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K1</strong></p>\n\n\t\t\t<p><strong>Team Leader </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>PhD in Physical Oceanography or Coastal Engineering</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>A minimum of 20 years in Coastal Engineering and Coastal Hazards including:</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>management of large development projects, international experience including developing countries</li>\n\t\t\t\t<li>leading multidisciplinary expert team towards the development of innovative technical solution.</li>\n\t\t\t</ul>\n\n\t\t\t<p>demonstrated skills in project planning, institutional and capacity development, and stakeholder facilitation, coupled with technical understanding gained through a career working in supporting disaster management sector.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K2</strong></p>\n\n\t\t\t<p><strong>Oceanographer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>Minimum PhD in Physical Oceanography or similar science.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>Experience in developing innovative coastal hazard solution, including on reef fronted island in reef fronted islands.&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K3</strong></p>\n\n\t\t\t<p><strong>Numerical Modeller</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>Minimum PhD in hydrodynamic modelling or similar science.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>experience in developing hydrodynamic and wave models in tropical island environment.&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K4</strong></p>\n\n\t\t\t<p><strong>Physical Oceanographer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>M.S specialised in Ocean observation systems</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>Minimum of 10-year experience including in the deployment of oceanographic instrument in remote location and the development of standard operational procedures through multi-stakeholder consultation.&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K5</strong></p>\n\n\t\t\t<p><strong>System Developer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>M.S specialized in oceanography</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>minimum of 5-year experience in developing scientific/technical solutions.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:105.4pt\">\n\t\t\t<p><strong>K6</strong></p>\n\n\t\t\t<p><strong>Trainer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:106.3pt\">\n\t\t\t<p>M.S specialized in the relevant science</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:262.95pt\">\n\t\t\t<p>minimum of 10-year experience in conducting or guiding technical training in developing countries.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Non-key Experts</p>\n\n<ul>\n\t<li>Full/part time interns (3):&nbsp; SPC will facilitate the identification of potential candidates and provide office space and equipment to the interns.&nbsp; Training will be co-jointly provided by SPC and the firm.</li>\n</ul>\n\n<ol>\n\t<li>Duration of the Assignment and Level of Effort</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The services will be provided over a period of eighteen (18) months inclusive of training, with an estimated level of effort of eighteen (18) person-months. It is expected that a specialist will be stationed at SPC to develop the inundation forecast framework for a minimum period of six (6) months. The hazard models and forecasting platforms should be developed in close collaboration with SPC&rsquo;s technical team. Consultations will be held in-country, in Tonga and Samoa, and will include the technical team at SPC.</p>\n\n<p>&nbsp;</p>\n\n<p>It is anticipated that most of the development services will be delivered from the Consultant&rsquo;s office location. However, this should be undertaken in close collaboration with SPC&rsquo;s technical teams involving fortnightly skype meetings. Following deployment of the impact forecast platform, onsite training will be provided at SPC in Fiji, Tonga and Samoa.</p>\n\n<ol>\n\t<li>Reporting Requirements</li>\n</ol>\n\n<p>The consultant will be required to submit monthly progress reports including fortnightly telephone conferences. The consultant will report to SPC&rsquo;s PREP Programme Manager, Mr. George Beck, georgeb@spc.int, and will work closely with the GEM Oceans and Maritime Programme.</p>\n\n<ol>\n\t<li>Clients Inputs</li>\n</ol>\n\n<p>SPC will provide office space and access to Internet in SPC Office in Suva and will make available all the existing reports and materials and provide access to existing data repositories. SPC will also assist in organizing consultations with stakeholders. SPC will collaborate with Samoa and Tonga to investigate the conversion of tropical cyclone wind models setup under PACSAFE as part of an impact-base forecasting system within the National Meteorological Services.&nbsp;</p>\n\n<ol>\n\t<li>Consultant and Client Obligations</li>\n</ol>\n\n<p>The Consultant is fully responsible for:</p>\n\n<ul>\n\t<li>Local transportation for the Key Experts when in Fiji or Participating Countries;</li>\n\t<li>Accommodation and any costs related to accommodation and meals, and incidentals;</li>\n\t<li>International transportation: from the country of residence to Pacific and within in the Pacific Region;</li>\n\t<li>Printing, communication, etc;</li>\n\t<li>Laptops and software*1;</li>\n</ul>\n\n<p><em>Note: 1 - the software developed for SPC will become SPC property.</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>[1] Sub-Component 1.1.3: Enhancement of the MHEWS Service and Preparedness Delivery System will improve service delivery by enhancing the MHEWS to include impact forecast and warning services that deliver actionable information to the public at risk and to emergency services.)</p>\n\n<p>&nbsp;</p>"},{"id":"OP00080850","notice_type":"Request for Expression of Interest","noticedate":"26-Nov-2019","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2019-12-17T00:00:00Z","submission_deadline_time":"23:00","project_ctry_name":"Lao People's Democratic Republic","project_id":"P162565","project_name":"Reducing Rural Poverty and Malnutrition Project","bid_reference_no":"C1-QCBS-01","bid_description":"Design, development, and implementation of social and beneficiary integrated MIS","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Nahaidiao Road, Sisavath Tai Village, Chanthabuly District, Vientiane Capital, Lao PDR","contact_ctry_name":"Lao People's Democratic Republic","contact_email":"kkkeo@yahoo.com","contact_name":"Kham Ouane Khamphoukeo","contact_organization":"Department of Rural Development and Cooperative","contact_phone_no":"8562055528499","submission_date":"2019-11-26T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>LAO PEOPLE&rsquo;S DEMOCRATIC REPUBLIC</strong></p>\n\n<p><strong>Peace Independence Democracy Unity and Prosperity</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Ministry of Agriculture and Forestry (MAF)</p>\n\n<p>Department of Rural Development and Cooperative (DRDC)</p>\n\n<p>Reducing Rural Poverty and Malnutrition Project</p>\n\n<p>Project ID No. P162565</p>\n\n<p>&nbsp;</p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>Consulting Services for a qualified System Integrator (SI) for the design, development and implementation of an Integrated Management Information System (MIS) Platform</strong></p>\n\n<p><strong>Loan/credit #: 6374, Project No.: P162565</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Government of Lao PDR received an IDA credit from the World Bank (WB) to implement a program entitled &quot;<strong>Reducing Rural Poverty and Malnutrition Project (P162565)</strong>. The Project Development Objective (PDO) is <em>to support the design and implementation of a nutrition-sensitive social assistance program to improve nutrition behaviors, and enhance the convergence of nutrition-focused interventions.</em></p>\n\n<p>&nbsp;</p>\n\n<p>The project will support the implementation of a nutrition-sensitive cash transfer program to address poverty and malnutrition in 12 districts in four northern provinces: Oudomxay, Phongsaly, Xiengkhuang, and Houaphan. It will provide a complementary package of incentives (cash transfers) aligned with social and behavior change communication (SBCC) to households in poor, rural areas, complementing other nutrition-specific and nutrition-sensitive sector investments. &nbsp;</p>\n\n<p>The project will also finance the development of key building blocks of a social protection system through an establishment of an integrated MIS Platform. This includes support to develop a household targeting system and to create a social registry. To populate the social registry, the project will leverage the government&rsquo;s previous poverty assessment data collection exercise and finance the data collection in the selected four provinces. The social registry will provide a &lsquo;gateway&rsquo; for easier identification of beneficiaries for targeted social programs. Specifically, the social registry, which will rank households by way of a PMT, will be used to determine household eligibility for the CCT program and other targeted interventions within the nutrition convergence approach. This will also cover the establishment of an integrated beneficiary registry which will allow for monitoring and coordinating &lsquo;who receives what&rsquo; across programs in target areas. The MIS is also expected to support the implementation of the CCT program.</p>\n\n<p>&nbsp;</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include provision of a team of consultants to manage and operate the proposed design and development of an integrated MIS Platform and providing its implementation support. The primary objective of the baseline data collection is to facilitate delivering a CCT program to support pregnant women and/or children under two years old in poor and vulnerable households using previously maintained household information. The CCT program, as a part of an integrated MIS &ndash; is expected to have functions such as enrolment, conditionality, beneficiary attendance, generation of electronic payment lists for cash transfers to the entitled beneficiaries, grievance handing, reporting among others to facilitate the automation of its business functions using a unified platform. &nbsp;&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>The Terms of Reference for the assignment can be requested from the contact details provided below.</p>\n\n<p>&nbsp;</p>\n\n<p>Ministry of Agriculture and Forestry (MAF) now invites eligible consulting firms (SIs) to indicate their interest in providing the services. The Consulting firm should be a reputable firm having proven experience in design, development and implementation of MIS platform in similar sectors preferably in safety net programs, health or education MIS, HRMIS, large scale database development or any other relevant system design and development of similar size and nature. The consulting firm (SI) is expected to have adequate experience and knowledge of doing similar work previously. The shortlisting criteria for the firms eligible to apply for the design, development and implementation of an Integrated Management Information System (MIS) Platform include the following:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Be a legal entity acceptable to MAF, independent and able to comply with international standards on business consulting services;</li>\n\t<li>At least 10 years of general experience implementing management contracts worldwide and specifically in developing countries; experience in ASEAN is an advantage;</li>\n\t<li>At least 5 years of specific experience in providing similar services in developing countries, under the public sector projects; experience on similar assignments financed by the World Bank is an asset;</li>\n\t<li>Proven record on successful completion of at least 5 assignments related to the design, development and implementation of an Integrated Management Information System (MIS) Platform services in specific industries for developing or least developed countries; such assignments implemented under the government institutions (e.g. ministries of planning and investment, agriculture and forestry) is an asset;</li>\n\t<li>Availability of eight (8) internationally experienced experts to undertake this two-year assignment fully based in Lao PDR.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to paragraph 3.14 to 3.17 of the World Bank&rsquo;s Procurement Regulations, July 2016 revised November 2017 and August 2018 (for Regulations projects), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications.</p>\n\n<p>&nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours from 08:00 to 16:00 hours, from Monday to Friday (Standard Lao PDR time).</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by December 17th, 2019.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Mr Insone Saysombath, Project coordinator </strong></p>\n\n<p>Email: insonesaysombath@yahoo.com&nbsp;</p>\n\n<p>Mobile: 020 59888199</p>\n\n<p>Office: 021 222346</p>\n\n<p><strong>Cc: Mrs. Khamphout CHANTHAVONG, Project Procurement focal point&nbsp; </strong></p>\n\n<p>&nbsp;</p>\n\n<p>Email: phoutdrdc@gmail.com</p>\n\n<p>Mobile: 020 2244 6660</p>\n\n<p>&nbsp;</p>\n\n<p>Office: 021 222346</p>\n\n<p>Address: Department of Rural Development and Cooporative, Ministry of Agriculture and Forestry, Ban Sibounheuang, Saysettha, inside the Prime Minister complex, Vientiane Capital, Lao P.D.R&nbsp;</p>"},{"id":"OP00064228","notice_type":"Invitation for Bids","noticedate":"10-Jan-2019","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2019-02-09T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"India","project_id":"P162086","project_name":"Jharkhand Power System Improvement Project","bid_reference_no":"IN-JBVNL-82075-CW-RFB-AMI","bid_description":"AMI project for 3.62 lakh meters in Ranchi town. Scope includes metering, RF and HES. Estimated Cost is on NPV basis.","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"Dhurwa, Ranchi, Jharkhand","contact_ctry_name":"India","contact_email":"piujbvnl@gmail.com","contact_name":"Sanjay  Kumar","contact_organization":"Jharkhand Bijli Vitran Nigam Limited","contact_phone_no":"9431709171","submission_date":"2019-01-10T00:00:00Z","notice_text":"<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<table border=\"0\" cellpadding=\"0\" cellspacing=\"0\" style=\"width:1425px\">\r\n\t<tbody>\r\n\t\t<tr>\r\n\t\t\t<td colspan=\"10\" style=\"height:36px; width:1425px\">Annexture -A&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:64px\">S.No</td>\r\n\t\t\t<td style=\"width:83px\">Query received on</td>\r\n\t\t\t<td style=\"width:64px\">Bidder</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;Page No. / Clause No.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Technical Specifications as per RFP</td>\r\n\t\t\t<td style=\"width:248px\">Queries / Modifications / Changes Suggested</td>\r\n\t\t\t<td style=\"width:183px\">Bidder&#39;s Remarks</td>\r\n\t\t\t<td style=\"width:167px\">TPDDL Remarks</td>\r\n\t\t\t<td style=\"width:83px\">Remarks Type</td>\r\n\t\t\t<td style=\"width:193px\">JBVNL Remark</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:155px\">1</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 17. Bid Prices and Discounts, Page no. 24</td>\r\n\t\t\t<td style=\"width:249px\">17.1 The prices and discounts quoted by the Bidder in the Letter of Bid &ndash;Financial Part and in the Price Schedules shall conform to the requirements specified below.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Agreed but the Employer shall use its best endeavours to assist the Contractor in obtaining in a timely and expeditious manner all permits, approvals and/or licenses necessary for the execution of the Contract from all local, state or national government authorities or public service undertakings that such authorities or undertakings require the Contractor or Subcontractors or the personnel of the Contractor or Subcontractors, as the case may be, to obtain.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">JBVNL is requested to Amend the clause suitably.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:92px; width:249px\">Unless otherwise specified in the BDS, Bidders shall quote for the entire Plant and Installation Services on a &ldquo;single responsibility&rdquo; basis. The total Bid price shall include all the Contractor&rsquo;s obligations mentioned in or to be reasonably inferred from the bidding document in respect of the design, manufacture, including procurement and subcontracting (if any), delivery, construction, installation and completion of the Plant. This includes all requirements under the Contractor&rsquo;s responsibilities for testing, pre-commissioning and commissioning of the plant and, where so required by the bidding document, the acquisition of all permits, approvals and licenses, etc.; the operation, maintenance and training services and such other items and services as specified in the bidding document, all in accordance with the requirements of the General Conditions. Items against which no price is entered by the Bidder will not be paid for by the Employer when executed and shall be deemed to be covered by the prices for other items. Corrections if any in the bid can be carried out by editing the information before electronic submission on e- procurement portal</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:139px\">2</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">Clause Section III - Evaluation and Qualification Criteria, Page no. 55</td>\r\n\t\t\t<td style=\"width:249px\">4.Technical Qualification Requirement</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">Since we are in Non-Disclosure Agreement with our customer under which the contract details like purchase order, work order etc can&rsquo;t be shared with the outside world.</td>\r\n\t\t\t<td style=\"width:183px\">4.Technical Qualification Requirement</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">In case, if bidder is submitting international experience (other than India) and requisite documents are not available, bidder shall submit a performance certificate duly signed/stamped by client with client name, signing authority, designation, contact no. and email with all the project related details for meeting the QR.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">SBD&nbsp; &amp; Cost Estimation Committee clarified that&nbsp; bidder shall submit a performance certificate along with PO order Quantity&nbsp; duly signed/stamped by ordering authority&nbsp; with authority&nbsp; name, signing authority, designation, contact no. and email with all the project related details for meeting the QR.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:14px; width:249px\">4.(b) and 4(C)</td>\r\n\t\t\t<td style=\"width:183px\">4.(b) and 4(C)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:15px; width:249px\">Document Required:-(b) Purchase orders</td>\r\n\t\t\t<td style=\"width:183px\">Document Required:-</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:49px; width:249px\">1. Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t\t<td style=\"width:183px\">Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement/ Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:181px\">3</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Section III - Evaluation and Qualification Criteria, Page no. 55</td>\r\n\t\t\t<td style=\"width:249px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed/commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have executed (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:86px\">4</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause Section III - Evaluation and Qualification Criteria, Page no. 55</td>\r\n\t\t\t<td style=\"width:249px\">4.Technical Qualification Requirement</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">As the clause demands is related to the supply and performance history hence there is no requirement to share Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">JBVNL is requested to delete the clause.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">deleted for 4.2 (a) and 4.2(b); applicable for 4.2(c) of table 2 &amp; 3</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">4.(a) and 4.(b)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">Document Required:-3. Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">5</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Section III - Evaluation and Qualification Criteria, Page no. 55</td>\r\n\t\t\t<td style=\"width:249px\">4.Technical Qualification Requirement</td>\r\n\t\t\t<td style=\"width:248px\">IT/Cloud Hosting is an integral part of the AMI solution. To ensure the security of the data is maintained GoI has approved several cloud service provider to offer the cloud service in India</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to add the qualification criteria for the Cloud Service Provider.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Cloud Service Provider must be empanelled with MEITY.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:226px\">6</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 551</td>\r\n\t\t\t<td style=\"width:249px\">9.3 The Contractor shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which such authorities or undertakings require the Contractor to obtain in its name and which are necessary for the performance of the Contract, including, without limitation, visas for the Contractor&rsquo;s and Subcontractor&rsquo;s personnel and entry permits for all imported Contractor&rsquo;s Equipment. The Contractor shall acquire all other permits, approvals and/or licenses that are not the responsibility of the Employer under GCC Sub-Clause 10.3 hereof and that are necessary for the performance of the Contract.</td>\r\n\t\t\t<td style=\"width:248px\">Agreed but the Employer shall use its best endeavours to assist the Contractor in obtaining in a timely and expeditious manner all permits, approvals and/or licenses necessary for the execution of the Contract from all local, state or national government authorities or public service undertakings that such authorities or undertakings require the Contractor or Subcontractors or the personnel of the Contractor or Subcontractors, as the case may be, to obtain.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to Amend the clause suitably.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Utility will facilitate, however, all the permits / approvals / licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:181px\">7</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 585</td>\r\n\t\t\t<td style=\"width:249px\">27.7 If the Contractor fails to commence the work necessary to remedy such defect or any damage to the Facilities caused by such defect within a reasonable time (which shall in no event be considered to be less than fifteen (15) days), the Employer may, following notice to the Contractor, proceed to do such work, and the reasonable costs incurred by the Employer in connection therewith shall be paid to the Employer by the Contractor or may be deducted by the Employer from any monies due the Contractor or claimed under the Performance Security.</td>\r\n\t\t\t<td style=\"width:248px\">Although we do not foresee such incident to occur. However, the additional cost in case of the clause getting implemented will not be borne by the Bidder.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to Amend the clause suitably.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:286px\">8</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 591</td>\r\n\t\t\t<td style=\"width:249px\">33. Loss of or Damage to Property; Accident or Injury to Workers; Indemnification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Contractor shall not be liable for any consequential damage arising in connection with the supply and installation of the Facilities and by reason of the negligence of the Contractor or its Subcontractors, or their employees, officers or agents, except any injury, death or property damage caused by the negligence of the Employer, its contractors, employees, officers or agents.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">JBVNL is requested to Amend the clause suitably.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:256px; width:249px\">33.1 Subject to GCC Sub-Clause 33.3, the Contractor shall indemnify and hold harmless the Employer and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, in respect of the death or injury of any person or loss of or damage to any property other than the Facilities whether accepted or not, arising in connection with the supply and installation of the Facilities and by reason of the negligence of the Contractor or its Subcontractors, or their employees, officers or agents, except any injury, death or property damage caused by the negligence of the Employer, its contractors, employees, officers or agents.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:137px\">9</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 689</td>\r\n\t\t\t<td style=\"width:249px\">3.1 General Repair Warranty</td>\r\n\t\t\t<td style=\"width:248px\">Replaced/reworked Meters shall have continuation of the existing warranty period as no &quot;Extended Warranty Period&quot; can be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">If during the Warranty/ Guarantee period some parts of the supplies are replaced owing to the defects/ damages under the Warranty, the Warranty period for replaced meters shall be for a period until the end of original Guarantee period</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px; width:249px\">3.1.1. All repairs and replacements performed by the Service Provider pursuant to this Agreement, shall cover a warranty for defects in materials and workmanship for a term that will expire twelve (12) months from the date of such corrective maintenance, without prejudice of the expiration date of the Agreement.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to amend the clause</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:289px\">10</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 689</td>\r\n\t\t\t<td style=\"width:249px\">3.1 General Repair Warranty</td>\r\n\t\t\t<td style=\"width:248px\">Replaced/reworked Meters shall have continuation of the existing warranty period as no &quot;Extended Warranty Period&quot; can be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">If during the Warranty/ Guarantee period some parts of the supplies are replaced owing to the defects/ damages under the Warranty, the Warranty period for replaced meters shall be for a period until the end of original Guarantee period</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:261px; width:249px\">3.1.3. In the event that Service Provider replaces Parts that failed during the final year of the Term in accordance with its obligations under the agreement, Service Provider hereby warrants to Employer that the replacement Parts installed in the Plant Equipment&rsquo;s during such period shall not fail due to a defect for one (1) year following the date of installation of such replacement Parts; provided that in no event shall any such warranty extend beyond earlier of (i) the period that is one (1) year following the expiration of the Term or (ii) the date of any termination of this Agreement for reasons other than attributable to Service Provider. During such period, if this Agreement is not in effect for any reason other than being terminated by Employer for cause, Service Provider&rsquo;s obligation will be limited to supplying all needed Parts on to the Site delivered basis. For the avoidance of doubt, this Clause may survive the termination or expiry (as the case may be) of this Agreement for a period of one (1) year.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to amend the clause</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">11</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Section VIII - General Conditions of Contract, Page no. 689</td>\r\n\t\t\t<td style=\"width:249px\">3.1 General Repair Warranty</td>\r\n\t\t\t<td style=\"width:248px\">Replaced/reworked Meters shall have continuation of the existing warranty period as no &quot;Extended Warranty Period&quot; can be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">If during the Warranty/ Guarantee period some parts of the supplies are replaced owing to the defects/ damages under the Warranty, the Warranty period for replaced meters shall be for a period until the end of original Guarantee period</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Yes</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:249px\">3.1.4. During Defect Liability Period if any repair and replacement are done, then the warrantee of the equipment shall be extended from the data of such repair and replacement to the period of original equipment warrantee w.r.t. that replaced component.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to amend the clause</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">12</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause B. FUNCTIONAL, ARCHITECTURAL AND PERFORMANCE</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">1.3. Advanced Metering Infrastructure (AMI) System &bull; Supply, installation and integration of additional meters 6 (new Consumers/change in existing consumer in Project Area) that may be required after commissioning and during O&amp;M period.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">JBVNL is requested to clarify if this clause is applicable to this tender?</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">variation&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">This is optional, Any additional meter requirement over and above the project quantity, will be paid additionally. However if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">This is optional, Any additional meter requirement over and above the project quantity, will be paid additionally. However if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">REQUIREMENTS OF AMI SYSTEM, Page no. 134</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">13</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause B. FUNCTIONAL, ARCHITECTURAL AND PERFORMANCE</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">f) Establishment of AMI Control Centre and management of Centralized management console with single monitor, Workstation consoles with dual 24&quot; monitor along with Operating System &amp; license and Printers with necessary software /Hardware and application software&rsquo;s.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Please confirm whether JBVNL will provide the office space in the project area to open the control centre with basic requirements like electricity supply, furniture, air conditioning etc.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL will provide the space for control centre with basic civil infra</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">JBVNL will provide the space for control centre with basic civil infra, furtniture, ACs, electrical fittings</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">REQUIREMENTS OF AMI SYSTEM, Page no. 135</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">14</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Section VII - Scope of Work, Page no. 134</td>\r\n\t\t\t<td style=\"width:249px\">Operation and maintenance of the AMI system for five years.</td>\r\n\t\t\t<td style=\"width:248px\">As per the RFP the FMS is for the RF network only for 60 months and the Cloud based software HES and NMS O&amp;M is only for One year with options to extension on years on year basis.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL is planning to procure cloud service in another tender of billing. However, for execution bidder will initially deploy solution on their cloud for one year and will be paid additionally for extended period on the quoted rate.&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">FMS of HES &amp; NMS is in the scope of Bidder for 5 years kindly refer clause 5.6.1 of price schedule for FMS of HES/NMS applications&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:131px\">15</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 135</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:249px\">c) Supply/Planning/Setup/tuning of RF Mesh Communication Infrastructure including Network Management (NMS) &amp; Head End System (HES) for the project area. HES, NMS and associated Software should be scalable of handling at least 10,00,000 Meters.</td>\r\n\t\t\t<td style=\"width:248px\">a) RF network to be delivered for 3,51,710 Smart meters in the project .</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">B) IT system to be delivered for supporting 3,62,655 end points</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">The system should be scalable for 10,00,000.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">&nbsp;Is the above assumption true ?</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">As per Page 116 Schedule No 2 the scalability desired is 5,00,000 only.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">16</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 135</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">e) Integration/interface of the HES/AMI system with MDM System. The MDM system will be implemented by JBVNL through a separate contract (to be funded by the World Bank). In case MDM implementation gets delayed due to any reason, the successful Bidder shall provide Billing Determinants to existing Billing Applications of the Employer.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">JBVNL is requested to give details of the existing billing application and its interfaces to accept billing meter data.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">JBVNL is requested to provide details</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e SAP ISU / Oracle etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e SAP ISU / Oracle etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to provide the billing determinants in soft copy or API form to facilitate the existing bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants in soft copy or API form to facilitate the existing bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">17</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 135</td>\r\n\t\t\t<td style=\"width:249px\">f) Establishment of AMI Control Centre and management of Centralized management console with single monitor, Workstation consoles with dual 24&quot; monitor along with Operating System &amp; license and Printers with necessary software /Hardware and application software&rsquo;s.</td>\r\n\t\t\t<td style=\"width:248px\">We would request to define the location of the Control centre .As per our understanding space for civil structure , building utilities (electricity , water and toilet) will be provided by JBVNL.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL will provide the space for control centre with basic civil infra</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">JBVNL will provide the space for control centre with basic civil infra, furniture, Acs, electrical fittings. Location of the control centre shall be HQ/Data Centre at Ranchi</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">18</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 135</td>\r\n\t\t\t<td style=\"width:249px\">Smart Meter Installation requirements along with consumer identification.</td>\r\n\t\t\t<td style=\"width:248px\">As per our assumption the details of the consumer will be provided by JBVNL and only cross verification of the details shall be done by the bidder</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">Yes. Further, Bidder has to do complete survey of the designated are and&nbsp; need to inform to JBVNL in case of any discrepancy.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes. Further , Bidder has to do complete survey of the designated are and&nbsp; need to inform to JBVNL in case of any discrepancy.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 135</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">iii. Assessment of backhaul connectivity (SIM/MPLS/Fibre) for data transfer from DCU/Gateway/Router/Access Points, etc. to HES.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to provide location of the JBVNL office premises, substation where data collector can be erected.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">JBVNL is requested to provide details</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Optimized Location to be Proposed by the Bidder in Engineering Document after the Survey.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">It is not necessary that all the collectors to be deployed in JBVNL premise hence Installation of Collector on public/ private buildings with necessary infrastructure including rent, any civil infrastructure for Antenna, electricity, earthing&nbsp; etc. shall be in bidders scope.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">a) Electrical supply</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:248px\">b) Earthing availability&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px\">20</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 136</td>\r\n\t\t\t<td style=\"width:249px\">Deployment of HES/NMS application on Cloud</td>\r\n\t\t\t<td style=\"width:248px\">The Cloud based IT Infra as per mandate from Government of India is required to be Meity Approved under Meghraj scheme.</td>\r\n\t\t\t<td style=\"width:183px\">The cloud based IT Infra must adhere to ISO 27001 certified MeitY empanelled minimum Tier-3 Data Centre within india.</td>\r\n\t\t\t<td style=\"width:167px\">Cloud Service Provider must be empanelled with MEITY.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Cloud Service Provider must be empanelled with MEITY.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">21</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 1.3. Advanced Metering Infrastructure (AMI) System, Page no. 136</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">7. Integration with existing legacy systems and upcoming DISCOM systems including Metering, Billing and Collection, MDMS, etc. Systems after finalization of Blueprint document.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Details of legacy system and upcoming DISCOM systems are required with scope of work will be signed at the time of contract signing else it is requested to be excluded.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">JBVNL is requested to delete the clause</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e. SAP ISU / Oracle etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">22</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.1. Smart Meters, Page no. 137</td>\r\n\t\t\t<td style=\"width:249px\">iv. Support both Smart-prepaid and post-paid metering as per CEA regulations.</td>\r\n\t\t\t<td style=\"width:248px\">We would request to clarify that the prepayment module is not in scope of work and is understood to be part of MDM application/separately sourced.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">Yes, it is part of MDMS however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes, it is part of MDMS however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">23</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.1. Smart Meters, Page no. 137</td>\r\n\t\t\t<td style=\"width:249px\">iv. Support both Smart-prepaid and post-paid metering as per CEA regulations.</td>\r\n\t\t\t<td style=\"width:248px\">As per our understanding only Prepaid and postpaid shall be supported by meter. Prepayment module/engine is not in scope of work.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">No Separate Prepaid engine required however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">No Separate Prepaid engine required however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">24</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.2. Communication Infrastructure, Page no. 139</td>\r\n\t\t\t<td style=\"width:249px\">The bidder, TSP and JBVNL shall sign a tripartite agreement for enabling the TSP to provide telecommunication services for this project within a period of 15 days for a particular area before commencement of work subject of feasibility report and survey for availability of network connectivity etc.</td>\r\n\t\t\t<td style=\"width:248px\">Historically The TPA is signed on post feasibility of the network (by Network service provider). However, The TPA(without SLA) can be signed by Network service provider.</td>\r\n\t\t\t<td style=\"width:183px\">The bidder, TSP and JBVNL shall sign a tripartite agreement for enabling the TSP to provide telecommunication services for this project.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">25</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.2.1. GENERAL REQUIREMENT, Page no. 139</td>\r\n\t\t\t<td style=\"width:249px\">The quality of installation of the various equipment &amp; power supply wiring to all field equipment shall be as per standards/ regulations/prevailing practices of the utility.</td>\r\n\t\t\t<td style=\"width:248px\">The specification of the RFP defines the quality of installation of the various equipment in scope. Any additional regulation (apart from mentioned standard) may please be given by utility for compliance</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to clarify.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">26</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.3.1. GENERAL REQUIREMENT OF ROUTERS / REPEATERS / ACCESS POINTS / GATEWAY / DCU BASED RF MESH NETWORK: Page no. 142</td>\r\n\t\t\t<td style=\"width:249px\">14. Provision of battery backup for not less than 1 hour shall be there to continue operation in case of power supply failure. The life expectancy of battery must NOT BE LESS than 5 years.</td>\r\n\t\t\t<td style=\"width:248px\">Battery backup of Field devices are recommended for higher duration in view of outages in general and extreme conditions</td>\r\n\t\t\t<td style=\"width:183px\">14. Provision of battery backup for not less than 6 hours shall be there to continue operation in case of power supply failure. The life expectancy of battery must NOT BE LESS than 5 years.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">27</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause &bull; DCU / GATEWAY / ROUTER / ACCESS POINT SPECIFICATIONS, Page no. 144</td>\r\n\t\t\t<td style=\"width:249px\">input Voltage &ndash; DCU / Gateway / Routers / Access Points shall have suitable power supply arrangements. Provision of battery backup for at least 1 hour shall be there to continue operation in case of power supply failure. The life expectancy of battery shall be 5 years or more.</td>\r\n\t\t\t<td style=\"width:248px\">Battery backup of Field devices are recommended for higher duration in view of outages in general and extreme conditions</td>\r\n\t\t\t<td style=\"width:183px\">input Voltage &ndash; DCU / Gateway / Routers / Access Points shall have suitable power supply arrangements. Provision of battery backup for at least 6 hours shall be there to continue operation in case of power supply failure. The life expectancy of battery shall be 5 years or more.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">28</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Constructional Specifications, Page no. 145</td>\r\n\t\t\t<td style=\"width:249px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP67 compliant.</td>\r\n\t\t\t<td style=\"width:248px\">IP 65 compliance suffice out door installation and therefore recommended</td>\r\n\t\t\t<td style=\"width:183px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP65 compliant.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed, IP 65</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed, IP 65</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:41px\">29</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Constructional Specifications, Page no. 145</td>\r\n\t\t\t<td style=\"width:249px\">Support for COAP as application layer protocol</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">CoAP is not applicable protocol for electrical distribution devices and is an IoT protocol</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">JBVNL is requested to delete the clause</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">Open standard: RFC 7252</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">30</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Standard Communication protocols, Page no. 148</td>\r\n\t\t\t<td style=\"width:249px\">CoAP -as application layer protocol</td>\r\n\t\t\t<td style=\"width:248px\">CoAP is not applicable protocol for electrical distribution devices and is an IoT protocol</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to delete the clause</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">31</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3.7. OPERATION &amp; MAINTENANCE, Page no. 156</td>\r\n\t\t\t<td style=\"width:249px\">vi. The successful bidder has to impart training to the DISCOM officers for using the application as and when required by DISCOM.</td>\r\n\t\t\t<td style=\"width:248px\">Training shall be imparted as per the RFP requirement</td>\r\n\t\t\t<td style=\"width:183px\">vi. The successful bidder has to impart training to the DISCOM officers for using the application as per RFP requirement.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">32</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.4. METER INSTALLATION AT CONSUMER PREMISES, Page no. 156</td>\r\n\t\t\t<td style=\"width:249px\">The smart meter installation shall be done by the AMI Implementing Agency as per the meter installation guidelines of JBVNL.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to share installation guidelines of JBVNL</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is required to provide installation guidelines.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">33</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.6. TRAINING AND CAPACITY BUILDING REQUIREMENTS, Page no. 159</td>\r\n\t\t\t<td style=\"width:249px\">f) Mobile app/Web Portal</td>\r\n\t\t\t<td style=\"width:248px\">Mobile App/Web portal is not defined in the RFP or Price bid therefore JBVNL is requested to delete the clause. Additionally we would like to add that mobile app and Consumer portal is integrated with MDM and not with HES.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL is requested to delete the clause</td>\r\n\t\t\t<td style=\"width:167px\">Deleted</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">34</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 1.10. SERVICE LEVEL AGREEMENT (SLA) &amp; PENALTY, Page no. 164</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Periodic collection of the 30-minute block profile data after every 60 minutes</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The frequency of the meter block profile reading is generally industry followed once in every four hours (as option of on demand reading can be executed as required) .The requirement is theoretically possible but will require high number of RF elements thereby making it financially infeasible.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Periodic collection of the 30-minute block profile data after every 240 minutes-</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:183px\">From 95% of meters with next Meter reading cycle.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">35</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.10. SERVICE LEVEL AGREEMENT (SLA) &amp; PENALTY, Page no. 164</td>\r\n\t\t\t<td style=\"width:249px\">From 98% of meters before next periodic packet is scheduled.</td>\r\n\t\t\t<td style=\"width:248px\">The frequency of the meter block profile reading is generally industry followed once in every four hours (as option of on demand reading can be executed as required) .</td>\r\n\t\t\t<td style=\"width:183px\">From 98% of meters before after two periodic packets is scheduled.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">36</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 1, Page no. 168</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">This specification covers the following for single phase 5-30A Static Watt hour</td>\r\n\t\t\t<td style=\"width:248px\">Meters having 10-60A current rating can measure lower current equivalent to 5-30A as well as can be used in future in case sanctioned load is increased by consumer.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Single Phase Smart Meter rating should be 5-30A</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">Therefore, we request JBVNL to change current rating from 5-30A to 10-60A.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:151px\">37</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 5, Page no. 173</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">16. Meter shall be calibrated through software at factory and modification in calibration shall not be possible at site by any means or external influence. However, configuration of parameter allowed for field reconfiguration shall be possible through wired or Over The Air (OTA) communication.</td>\r\n\t\t\t<td style=\"width:248px\">Smart meters have lots of programming as mentioned in IS 16444 including Firmware change, it is not advisable to program any parameter due to security concerns mentioned in IS 15959 P2.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">Hence we request JBVNL to delete requirement of field programming through local port mentioned in different clauses of specification. However, any programming can be done through RF communication port Over the Air.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">38</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 5, Page no. 173</td>\r\n\t\t\t<td style=\"width:249px\">18. b) Between each current (or voltage circuit) &amp; each other circuit.: 50 M Ohm</td>\r\n\t\t\t<td style=\"width:248px\">This requirement is not applicable for 1P and 3P whole current meter as per IS 16444 P1.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">IS to be followed.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Relevant IS to be followed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">39</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 6, Page no. 177</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">5. All electrically live screws shall be of brass/ nickel tin-plated.</td>\r\n\t\t\t<td style=\"width:248px\">Live screws shall be Nickel plated brass. Same shall be applicable for other variant required in the specification.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">All electrically live screws shall be of brass and nickel / tin-plated.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">All electrically live screws shall be of brass and nickel / tin-plated.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">We assume it as Typographical error in specification it should be &quot; All electrically live screws shall be of brass nickel/ tin-plated&quot;.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:196px\">40</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 6.0 Battery, Page no. 178</td>\r\n\t\t\t<td style=\"width:249px\">10. Lithium ion battery with guaranteed shelf life of 10 years and capacity life of 15 years. Lithium thiol Chloride battery will be preferred. In case battery removal or total discharge same should not affect the working &amp; memory of the meter even in case of single wire power condition.</td>\r\n\t\t\t<td style=\"width:248px\">Non- rechargeable Lithium ion battery having guaranteed life up to guaranteed life of meter. JBVNL is requested to amend the clause.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:249px\">RTC shall have separate battery backup.</td>\r\n\t\t\t<td style=\"width:248px\">If main battery is disconnected/removed then meter functionality which is dependent on battery will impact like Single wire tamper condition, JBVNL is requested to delete the requirement.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Same shall be applicable for all variants mentioned in specs.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">41</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause GSM comms compatibility, Page no. 179</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">15. As per clause no 1.2(b) of IS 16444 Part -1. Meter should have provision of communication module with both the variant mentioned in IS 16444 Part-1. This module should be able to connect NAN or WAN (as per the plugged module RF or GSM) for two-way communication. Either of these will be used.</td>\r\n\t\t\t<td style=\"width:248px\">Comms will be powered by meter; power supply requirement of RF and comms will differ. JBVNL is requested to use only one communication technology i.e. RF.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">15. As per clause no 1.2(b) of IS 16444 Part -1. Meter should have provision of communication module mentioned in IS 16444 Part-1. This module should be able to connect NAN (as per the plugged RF module) for two-way communication.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">15. As per clause no 1.2(b) of IS 16444 Part -1. Meter should have provision of communication module mentioned in IS 16444 Part-1. This module should be able to connect NAN (as per the plugged RF module) for two-way communication.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">Same shall be applicable for all variants mentioned in specs.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">42</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Seals, Page no. 179</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">17. The Serial Number of Meter, Polycarbonate Body Seal/ Sticker Seal and Loose Seal for Terminal Cover shall be same.</td>\r\n\t\t\t<td style=\"width:248px\">we request JBVNL to accept random seal number which is independent of meter number to avoid any seal replacement tampering in field.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">Same shall be applicable for all variants mentioned in specs.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">43</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 7.0 Load survey, Page no. 183</td>\r\n\t\t\t<td style=\"width:249px\">ii. Voltage</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Only one parameter i.e. Average voltage shall be required as per IS 15959 P2. JBVNL is requested to delete voltage from Load survey</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">vii. Voltage- average values during the block period time.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">44</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 7.0 Name Plate, Page no. 184</td>\r\n\t\t\t<td style=\"width:249px\">h. Property of &ldquo;JBVNL&rdquo;</td>\r\n\t\t\t<td style=\"width:248px\">Property of utility is not available in nameplate Profile (in readout) as per IS 15959 P2, however same can be printed on Nameplate.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:291px\">45</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:92px\">Clause periodic Push, Page no. 186</td>\r\n\t\t\t<td style=\"width:249px\">a) Meter shall be able to push following instantaneous parameters to HES at predefined intervals.</td>\r\n\t\t\t<td style=\"width:248px\">Instant parameter value will change in every instant, requested parameter are of no use for any analysis or billing. We request JBVNL to include event profile, billing, daily survey and load survey for Periodic push instead of instantaneous profile parameters.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">Specification to be complied. Frequency of Instant data push will be finalised during detailed design stage.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">i. Device ID</td>\r\n\t\t\t<td style=\"width:248px\">Same shall be applicable for all variants mentioned in specs.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">ii. Push setup ID</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">iii. Real Time clock- Date and time</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">iv. Voltage</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">v. Phase current</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">vi. Signed Power factor</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">vii. Apparent power KVA</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">viii. Active power Kw Cumulative Energy, Kwh (Import)</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">ix. Cumulative energy KVAH (Import)</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">46</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Single wire Power, Page no. 189</td>\r\n\t\t\t<td style=\"width:249px\">11. Meter should have disconnected the load switch to avoid load drawn in above condition.</td>\r\n\t\t\t<td style=\"width:248px\">Meter should record an event as well as record energy. Relay operation cannot be provided during single wire.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specification to be complied.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Specification to be complied.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">47</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Non-Rollover events, Page no. 189</td>\r\n\t\t\t<td style=\"width:249px\">b) For each occurrence event captured, the cumulative tamper count shall be incremented.</td>\r\n\t\t\t<td style=\"width:248px\">As per IS 15959 tamper count shall not increment for Non-rollover event. JBVNL is requested to delete/modify the requirement for all variants mentioned in specs.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">For each occurrence, even for Non-rollover event, event should be captured and tamper count shall be incremented.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">For each occurrence, even for Non-rollover event, event should be captured and tamper count shall be incremented.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:136px\">48</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Clause 18, 19, Page no. 189</td>\r\n\t\t\t<td style=\"width:249px\">I/C Neutral Disconnected O/G Neutral &amp; Load Connected to Earth.: -</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">Meter should record an event as well as record energy. Relay operation under such condition will impact revenue loss to JBVNL.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Specification to be complied.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Specification to be complied.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">Meter should have disconnected the load switch to avoid load drawn in above condition</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">I/C Neutral Disconnected, O/G Neutral Connected to Earth Through Resistor &amp; Load Connected to Earth:-</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">Meter should have disconnected the load switch to avoid load drawn in above condition.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"9\" style=\"height:206px\">49</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:92px\">Clause Parameter snap shot, Page no. 190</td>\r\n\t\t\t<td style=\"width:249px\">iii. Current R Phase - instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">These parameters are for 3Phase, JBVNL is requested to mention single phase parameters that are: -</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">iv. Current Y Phase - instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">Voltage</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">v. Current B Phase - instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">Metering Current</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">vi. Voltage R Phase</td>\r\n\t\t\t<td style=\"width:248px\">PF</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">vii. Voltage Y Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">viii. Voltage B Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">ix. Power factor R Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">x. Power factor Y Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">xi. Power factor B Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">50</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause 10.0 Software for HHU, Page no. 193</td>\r\n\t\t\t<td style=\"width:249px\">The manufacturer has to provide software capable of downloading all the data stored in meter memory through CMRI. The CMRI software shall work both on SANDS &amp; Analogic CMRI devices. Along with software for traditional CMRI devices bidder shall also provide software for android or windows based HHUs.</td>\r\n\t\t\t<td style=\"width:248px\">CMRI software will not be able to work in Sands and Analogic devices due to implementation of security mentioned in IS 16444. Windows based machines will be used to download meters data from optical port and also through RF port after all security keys authentication</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed, bidder to ensure all required reading and diagnostic tools are available with them to ensure SLA as mentioned in Tender. Specification and costing of these tools should be shared with JBVNL in case JBVNL wants to maintain their own devices bidder should supply them on cost basis.&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed, bidder to ensure all required reading and diagnostic tools are available with them to ensure SLA as mentioned in Tender. Specification and costing of these tools should be shared with JBVNL in case JBVNL wants to maintain their own devices bidder should supply them on cost basis.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">51</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Data downloading cable, Page no. 194</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">a) Optical port should be provided with at least 1-mtr cable, having optical sensor at one end and USB 3.0 or higher connector on other end. Cable should be suitable for downloading meter data.</td>\r\n\t\t\t<td style=\"width:248px\">As meter will be communicated through RF, requirement of optical cable not foreseen.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed, however provision of reading meter through optical port should be kept there as a fall-back arrangement in case RF fails.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed, however provision of reading meter through optical port should be kept there as a fall-back arrangement in case RF fails.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">JBVNL is requested to delete the requirement for all variants mentioned in specification.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"6\" style=\"height:131px\">52</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:92px\">Clause 17.0 Component List, Page no. 200</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to add following reputate makes</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Memory- Adesto, Macronix, ST microelectronics</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Display- Jiya electronics, Optics India</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Electronics- ST micro electronics</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Battery- Vitzro cell, EVE</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:248px\">Comms- Liteon</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">53</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause, Page no. 205</td>\r\n\t\t\t<td style=\"width:249px\">c) The thickness of the box shall not be less than 3.0 mm on the load bearing side and other sides, door and roof shall not be less than 2.5 mm.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to amend thickness of box with minimum 2.0 mm</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">can be reduced for load bearing side minimum 2.5 and other side should not be less than 2.MM.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">54</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause Display, Page no. 221</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Backlit LCD, minimum 8 digits.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">JBVNL is requested to amend 7 digit which is sufficient for 20-100A meter.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed,</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed, Backlit LCD, minimum 7 digits for 1Ph and 3 Ph; however, 3 Phase whole current meter current rating should be 10-60A.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:167px\">Backlit LCD, minimum 7 digits for 1Ph and 3 Ph</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">55</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause MD registration, Page no. 231</td>\r\n\t\t\t<td style=\"width:249px\">Block / 15 min sliding window with 30 min integration period as per requirement.</td>\r\n\t\t\t<td style=\"width:248px\">Sliding window shall be 1/3rd of Integration period i.e. 5 min for 15 min IP and 10 min for 30 min IP as per IS 15959. This amendment shall be applicable for LTCT meter also.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">56</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Prepayment, Page no. 235</td>\r\n\t\t\t<td style=\"width:249px\">Reconnection in case of prepayment meter shall be as per prepayment profile and balance/credit availability in the meter.</td>\r\n\t\t\t<td style=\"width:248px\">As per IS 16444 system-based prepayment is applicable where all payment calculation is done through software at MDM end and communicated to meter. Please amend the same for all variants.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Noted, however bidder to support all pre-payment commands as mentioned in Spec and as per IS. Detailed discussion will be done during engineering stage.&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Noted, however bidder to support all pre-payment commands as mentioned in Specification and as per IS. Detailed discussion will be done during engineering stage.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">57</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause push button, Page no. 239</td>\r\n\t\t\t<td style=\"width:249px\">Meter with push button for manual display shall not be acceptable.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to relook the push button requirement as well as display parameters.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Push button to be provided for manual display</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Push button to be provided for manual display</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">58</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td style=\"width:92px\">Clause Tamper Events, Page no.&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to provide events for 3P WCM as well as LTCT, mentioned tampers are for single phase.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Please refer annexure 5 for tamper events</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:196px\">59</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Landis+Gyr</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause External CT&#39;s, Page no.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL is requested to provide clarity on scope of external CT&#39;s 100/5 and 200/5.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (part 1) and and relevant IS 15959&nbsp; and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">If required then same shall be added in BOQ with quantity.</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Specification of External CT&#39;s and Thread thru meter&nbsp; enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:171px\">60</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td style=\"width:248px\">Kindly amend the requirement for the below criteria</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">Since the project involves Implementation and O&amp;M of AMI system comprising the meters, RF Communication, HES and other items, we request you to kindly specify the Eligibility and Qualification Criteria applicable for a System Integrator who can offer the entire AMI system as an integrated solution instead of a meter manufacturing and RF Mesh Infra experience criteria.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:249px\">4.1 General Experience</td>\r\n\t\t\t<td style=\"width:248px\">4. Technical Qualification Requirement:</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 53</td>\r\n\t\t\t<td style=\"width:249px\">4.2a Specific Experience</td>\r\n\t\t\t<td style=\"width:248px\">4.1 General Experience</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">4.2a Specific Experience</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:406px\">61</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td style=\"width:248px\">The bidder must have successfully supplied, installed and commissioned/under execution of RF Mesh/GPRS infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">Both RF Mesh and GPRS are commonly used technologies in meter communication. Hence, we request you to accept credentials of GPRS communication as well.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">RF is envisaged for METER to DCU and GPRS/MPLS is planned for DCU to HES.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">RF is envisaged for METER to DCU and GPRS/MPLS is planned for DCU to HES</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:249px\">4.2c Specific Experience</td>\r\n\t\t\t<td style=\"width:248px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:135px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 55</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:248px\">The RF mesh/GPRS technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:361px\">62</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Additional clause</td>\r\n\t\t\t<td style=\"width:248px\">Kindly add the below mentioned clause to the referred eligibility criterion</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Since the number of JV partners allowed is only 2, we request you to add the mentioned clause to &quot;Table 2 - Eligibility and Qualification Criteria for Joint Venture&quot;.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JV is allowed up to max. 2 partner including lead member. However sub-contractor QR can be used for meeting QR clause 4.2.c.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:270px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:248px\">&quot;* The Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub-contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub-contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer. In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent) shall be applicable on the Performance Security.&quot;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 61</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">63</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, Section II - Bid Data Sheet</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Joint Venture (JV) is allowed. Maximum partners in a JV shall be two (2).</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request you to allow a maximum of 3 partners in a JV.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Since the number of JV partners allowed is only 2, System Integrators will not be able to bid as specific experience for Meter and RF Mesh Infra under Eligibility criteria are mainly OEM-centric.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">ITB 4.1, 42</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:111px\">64</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">RFP, PCC 13. Securities, 635</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">PCC 13.3.1 The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: Ten percent (10%) of the Contract Price. In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid, a rebate of Two percent (2%) shall be applicable on the Performance Security.</td>\r\n\t\t\t<td style=\"width:248px\">Kindly amend the clause as follows:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">In addition to the Tripartite agreement, the TSP should also be a party to the entire agreement. The lead bidder shall not be responsible for covering the Performance Security requirements on behalf of the TSP partner. Kindly confirm.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:248px\">PCC 13.3.1 The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: Ten percent (10%) of the Contract Price EXCLUDING THE TSP PART OF THE CONTRACT VALUE.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:316px\">65</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP, PCC 25. Commissioning and Operational Acceptance, 637</td>\r\n\t\t\t<td style=\"width:249px\">(e) Operational Acceptance</td>\r\n\t\t\t<td style=\"width:248px\">Kindly amend the clause as:</td>\r\n\t\t\t<td style=\"width:183px\">Request you to amend this clause as the successful bidder can have the flexibility to supply, install and commission the meters as per the detailed project implementation schedule submitted after the award of the contract thereby ensuring the responsibility of completing the entire project on time.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">(a) Operation Acceptance of supply lot:</td>\r\n\t\t\t<td style=\"width:248px\">&quot;i. Total Meters supply shall be in lots of 20,000 meters (with all required accessories for complete installation) in each lot. Next lot shall be supplied only after at least 10,000 meters from the each already supplied lot are installed and commissioned.&quot;</td>\r\n\t\t\t<td style=\"width:183px\">Also the bidder should not be penalized for the delay installation of meters due to no fault of the bidder. Kindly confirm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:249px\">i. Total Meters supply shall be in lots of 20,000 meters (with all required accessories for complete installation) in each lot. Next lot shall be supplied only after at least 10,000 meters from the each already supplied lot are installed and commissioned.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">66</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP, PCC 25. Commissioning and Operational Acceptance, 637</td>\r\n\t\t\t<td style=\"width:249px\">(e) Operational Acceptance</td>\r\n\t\t\t<td style=\"width:248px\">Kindly amend the clause as:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Request you to amend this clause as the successful bidder can have the flexibility to supply, install and commission the meters as per the detailed project implementation schedule submitted after the award of the contract thereby ensuring the responsibility of completing the entire project on time.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">(a) Operation Acceptance of supply lot:</td>\r\n\t\t\t<td style=\"width:248px\">iii. Further, after first lot onward, the total inventory of meters, at any given point in time, shall not be more than 60,000.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">iii. Further, after first lot onward, the total inventory of meters, at any given point in time, shall not be more than 30,000.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:268px\">67</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">RFP, PCC 25. Commissioning and Operational Acceptance, 638</td>\r\n\t\t\t<td style=\"width:249px\">(c) Operational Acceptance of complete project:</td>\r\n\t\t\t<td style=\"width:248px\">1. Kindly limit the scope of checking the data reception till HES end.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">1. The objective of AMI to get the data and alerts at MDM and billing system, hence SLA will be measure at MDM level only.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:74px; width:249px\">i. An Operational acceptance of complete project shall be given to bidder which includes but not limited to:-</td>\r\n\t\t\t<td style=\"width:248px\">2. We understand that JBVNL shall facilitate the integration of existing/upcoming MBC/MDMS systems through open APIs. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">2 &amp;3. There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:71px; width:249px\">3. Data is received in existing billing system and/or any other upcoming utility system (MBC, MDMS) during contract period.</td>\r\n\t\t\t<td style=\"width:248px\">3. Please provide details about the existing MBC/MDAS systems.</td>\r\n\t\t\t<td style=\"width:167px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">We understand that, after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:96px\">68</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP, PCC 25. Commissioning and Operational Acceptance, 639</td>\r\n\t\t\t<td style=\"width:249px\">(c) Operational Acceptance of complete project:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Request you to kindly specify the activities for Operational Acceptance of complete project.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Bidder is responsible for the scope of work clearly defined in RFP as the mentioned clause is open -ended.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bidder to refer RFP for the same</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bidder to refer RFP for the same</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">i. An Operational acceptance of complete project shall be given to bidder which includes but not limited to:-</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">5. Any other work not included in this RFP but necessary for this project success.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">69</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 1.10. SERVICE LEVEL AGREEMENT (SLA) &amp; PENALTY, 164</td>\r\n\t\t\t<td style=\"width:249px\">AMI system includes the communications links provided by Network Provider /third parties such as telecommunications companies and bidder has to ensure the desired performance level.</td>\r\n\t\t\t<td style=\"width:248px\">Request you to delete this clause.</td>\r\n\t\t\t<td style=\"width:183px\">The lead bidder should not be penalised for the breach in SLA of TSP.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">70</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, TRIPARTITE AGREEMENT, 671</td>\r\n\t\t\t<td style=\"width:249px\">TRIPARTITE AGREEMENT</td>\r\n\t\t\t<td style=\"width:248px\">Kindly include SLA for communications links provided by TSP in the Tripartite Agreement.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Kindly include SLA for communications links provided by TSP in the Tripartite Agreement.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Overall SLA given which is to be met by bidder</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Overall SLA given which is to be met by bidder</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:306px\">71</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">RFP, 1.10. SERVICE LEVEL AGREEMENT (SLA) &amp; PENALTY, 166</td>\r\n\t\t\t<td style=\"width:249px\">1. &gt;=99% - No penalty</td>\r\n\t\t\t<td style=\"width:248px\">Kindly amend the clause as:</td>\r\n\t\t\t<td style=\"width:183px\">Kindly amend the clause as:</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:249px\">2. &gt;= 90% to &lt; 99%* - No payment towards non-reporting consumer Meters. Additionally, penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of the vendor.</td>\r\n\t\t\t<td style=\"width:248px\">1. &gt;=99% - No penalty</td>\r\n\t\t\t<td style=\"width:183px\">1. &gt;=99% - No penalty</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:135px; width:249px\">3. Below 90 % - No payment shall be made</td>\r\n\t\t\t<td style=\"width:248px\">2. &gt;= 70% to &lt; 99%* - No payment towards non-reporting consumer Meters excluding the meters which are tampered. Additionally, penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of that non-reporting consumer meter.</td>\r\n\t\t\t<td style=\"width:183px\">2. &gt;= 70% to &lt; 99%* - No payment towards non-reporting consumer Meters excluding the meters which are tampered. Additionally, penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of that particular non-reporting consumer meter.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">3. Below 70 % - No payment shall be made penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of the vendor.</td>\r\n\t\t\t<td style=\"width:183px\">3. Below 70 % - No payment shall be made penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of the vendor.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:331px\">72</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">RFP, 6.0 Constructional Requirement, 179</td>\r\n\t\t\t<td style=\"width:249px\">16. Meter Sealing Arrangement</td>\r\n\t\t\t<td style=\"width:248px\">Due to the high sensitivity &amp; in order to avoid misuse, manufacturing &amp; supply of meter seals is highly regulated and controlled by DISCOMs.</td>\r\n\t\t\t<td style=\"width:183px\">Due to the high sensitivity &amp; in order to avoid misuse, manufacturing &amp; supply of meter seals is highly regulated and controlled by DISCOMs.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Seal will be provided by JBVNL, however bidder to reconcile the seals on monthly basis. Details process of sealing will be discussed during contract award.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Seal will be provided by JBVNL, however bidder to reconcile the seals on monthly basis. Details process of sealing will be discussed during contract award.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">17. Manufacturer&rsquo;s / JBVNL Seals</td>\r\n\t\t\t<td style=\"width:248px\">Further we would like to bring to your notice that in all the projects so far implemented by GoI viz., RAPDRP, DDUGJY, SAUBHAGYA, RGGVY, etc meter seals are always provided by DISCOM only.</td>\r\n\t\t\t<td style=\"width:183px\">Further we would like to bring to your notice that in all the projects so far implemented by GoI viz., RAPDRP, DDUGJY, SAUBHAGYA, RGGVY, etc meter seals are always provided by DISCOM only.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">18. Seal record</td>\r\n\t\t\t<td style=\"width:248px\">Hence we request you to please confirm that the meter seals shall be out of scope of this project and shall be issued by JBVNL to successful bidder during implementation.</td>\r\n\t\t\t<td style=\"width:183px\">Hence we request you to please confirm that the meter seals shall be out of scope of this project and shall be issued by JBVNL to successful bidder during implementation.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Alternatively, if JBVNL insists on meter seals to be supplied by Bidder, request you to kindly provide the approved vendor list of meter seals.</td>\r\n\t\t\t<td style=\"width:183px\">Alternatively, if JBVNL insists on meter seals to be supplied by Bidder, request you to kindly provide the approved vendor list of meter seals.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:122px\">73</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 1.10. SERVICE LEVEL AGREEMENT (SLA) &amp; PENALTY, 164</td>\r\n\t\t\t<td style=\"width:249px\">General</td>\r\n\t\t\t<td style=\"width:248px\">We understand that overall SLA penalty shall not exceed 10% of O&amp;M Cost quoted. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:183px\">We understand that overall SLA penalty shall not exceed 10% of O&amp;M Cost quoted. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, Implementation Schedule, 309</td>\r\n\t\t\t<td style=\"width:249px\">1 - O&amp;M Period may be extended of each phase up to the last date of last phase to end the O&amp;M of all phases at same date.</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm that the payment shall be done according to the rates mutually decided for the extended O&amp;M period.</td>\r\n\t\t\t<td style=\"width:183px\">Please confirm that the payment shall be done according to the rates mutually decided for the extended O&amp;M period.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder will be paid for the extended period of O&amp;M on prorate basis on the rate quoted by bidder for O&amp;M period.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder will be paid for the extended period of O&amp;M on prorate basis on the rate quoted by bidder for O&amp;M period.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:201px\">74</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP, Section IX - Particular Conditions of Contract, 639</td>\r\n\t\t\t<td style=\"width:249px\">PCC 26.2</td>\r\n\t\t\t<td style=\"width:248px\">request to modify the clause as:</td>\r\n\t\t\t<td style=\"width:183px\">request to modify the clause as:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:105px; width:249px\">Applicable rate for liquidated damages: 0.5% per week, and the maximum shall not exceed ten percent (10%) of the Contract price</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;Applicable rate for liquidated damages: 0.5% per week for undelivered portion, and the maximum shall not exceed five percent (5%) of the price quoted for the respective schedule. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;Applicable rate for liquidated damages: 0.5% per week for undelivered portion, and the maximum shall not exceed five percent (5%) of the price quoted for the respective schedule. Kindly confirm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">The above rate applies to the price of the part of the Facilities, as quoted in the Price Schedule, for that part for which the Contractor fails to PCC 26.3. No bonus will be given for earlier Completion of the Facilities or part thereof.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">75</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 14. PERFORMANCE SECURITY, 635</td>\r\n\t\t\t<td style=\"width:249px\">PCC 13.3.1 The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: Ten percent (10%) of the Contract Price. In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid, a rebate of Two percent (2%) shall be applicable on the Performance Security.</td>\r\n\t\t\t<td style=\"width:248px\">We understand that Performance Security shall be valid for a period of 60 months+ 90 days as mentioned in Clause 14.1 PERFORMANCE SECURITY (Page No. 697 of RFP). However successful bidder is requested to submit performance security for O&amp;M and extended defect liability separately. So, request you to kindly amend the validity of performance security as 24 months+ 90 days.</td>\r\n\t\t\t<td style=\"width:183px\">We understand that Performance Security shall be valid for a period of 60 months+ 90 days as mentioned in Clause 14.1 PERFORMANCE SECURITY (Page No. 697 of RFP). However successful bidder is requested to submit performance security for O&amp;M and extended defect liability separately. So, request you to kindly amend the validity of performance security as 24 months+ 90 days.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions. However, clause related to rebate is deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">76</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td style=\"width:249px\">General</td>\r\n\t\t\t<td style=\"width:248px\">Integration of HES shall be limited to only one MDMS &amp; one billing system. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">Integration of HES shall be limited to only one MDMS &amp; one billing system. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Yes</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">77</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td style=\"width:249px\">General</td>\r\n\t\t\t<td style=\"width:248px\">We presume that any civil/structural work during meter replacement at consumer premises is excluded from the scope of bidder. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">We presume that any civil/structural work during meter replacement at consumer premises is excluded from the scope of bidder. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Minor civil/structural work limited to meter installation/replacement is under this scope. No major civil work is not under this RFP scope.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Minor civil/structural work limited to meter installation/replacement is under this scope. No major civil work is not under this RFP scope.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">78</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 14. PERFORMANCE SECURITY, 636</td>\r\n\t\t\t<td style=\"width:249px\">The Performance Security shall be reduced to ten percent (10%) of the value of the component covered by the extended defect liability to cover the Contractor&rsquo;s extended defect liability in accordance with the provision in the PCC, pursuant to GCC Sub-Clause 27.10. In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid, a rebate of Two percent (2%) shall be applicable on the Performance Security to cover the extended defect liability.</td>\r\n\t\t\t<td style=\"width:248px\">Please waive off the submission of Performance Security for extended defect liability.</td>\r\n\t\t\t<td style=\"width:183px\">Please waive off the submission of Performance Security for extended defect liability.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Please refer the PCC cl. No. 27, which will prevail</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">79</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, Form of Bid Security &ndash; Bank Guarantee, 104</td>\r\n\t\t\t<td style=\"width:249px\">Bid Security &ndash; Bank Guarantee</td>\r\n\t\t\t<td style=\"width:248px\">Kindly allow us to mention only lead bidder&#39;s name in Bid Security form.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly allow us to mention only lead bidder&#39;s name in Bid Security form.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">80</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 37. Force Majeure, 596</td>\r\n\t\t\t<td style=\"width:249px\">Force Majeure</td>\r\n\t\t\t<td style=\"width:248px\">Request you to consider Political Unrest as a force majeure event.</td>\r\n\t\t\t<td style=\"width:183px\">Request you to consider Political Unrest as a force majeure event.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:502px\">81</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:249px\">New Clause proposed - Assignment Clause</td>\r\n\t\t\t<td style=\"width:248px\">In order to have better working capital for the project we propose an Assignment clause as below to be incorporated in the contract, which shall allow us to bill discount with financing institution.</td>\r\n\t\t\t<td style=\"width:183px\">In order to have better working capital for the project we propose an Assignment clause as below to be incorporated in the contract, which shall allow us to bill discount with financing institution.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">Assignment Clause (new Clause proposed) :</td>\r\n\t\t\t<td style=\"width:183px\">Assignment Clause (new Clause proposed) :</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:126px; width:248px\">&ldquo;The Contractor shall not, without the express prior written consent of the Employer, assign to any third party the Contract or any part thereof, or any right, benefit, obligation or interest therein or there under, except that the Contractor shall be entitled to assign either absolutely or by way of charge any monies due and payable to it or that may become due and payable to it under the Contract to any Financial Institution(s) or Bank(s) or NBFC(s).</td>\r\n\t\t\t<td style=\"width:183px\">&ldquo;The Contractor shall not, without the express prior written consent of the Employer, assign to any third party the Contract or any part thereof, or any right, benefit, obligation or interest therein or there under, except that the Contractor shall be entitled to assign either absolutely or by way of charge any monies due and payable to it or that may become due and payable to it under the Contract to any Financial Institution(s) or Bank(s) or NBFC(s).</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:210px; width:248px\">In the event the Contractor assigns the monies due and payable to it or that may become due and payable to it, under the Contract, to any Financial Institution(s) or Bank(s) or NBFC(s), the Employer shall acknowledge the intimation letter it may receive from such financial institution(s) or Bank(s) or NBFC (s). If the Employer does not reply within 15 days of the receipt of the intimation letter, it can be considered as &ldquo;acknowledged by the Employer&rdquo;. Furthermore, the Employer will provide an indicative date by when the funds will be released to the Contractor as a measure of comfort for the decisions of Financial Institution(s) or Bank(s) or NBFC(s)&rdquo;.</td>\r\n\t\t\t<td style=\"width:183px\">In the event the Contractor assigns the monies due and payable to it or that may become due and payable to it, under the Contract, to any Financial Institution(s) or Bank(s) or NBFC(s), the Employer shall acknowledge the intimation letter it may receive from such financial institution(s) or Bank(s) or NBFC (s). If the Employer does not reply within 15 days of the receipt of the intimation letter, it can be considered as &ldquo;acknowledged by the Employer&rdquo;. Furthermore, the Employer will provide an indicative date by when the funds will be released to the Contractor as a measure of comfort for the decisions of Financial Institution(s) or Bank(s) or NBFC(s)&rdquo;.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">This clause will enable improvement in cash flow and hence encourage participation by more bidders.</td>\r\n\t\t\t<td style=\"width:183px\">This clause will enable improvement in cash flow and hence encourage participation by more bidders.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:306px\">82</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">RFP, 14. Taxes and Duties, 556</td>\r\n\t\t\t<td style=\"width:249px\">14.2 Notwithstanding GCC Sub-Clause 14.1 above, the Employer shall bear and promptly pay</td>\r\n\t\t\t<td style=\"width:248px\">Kindly note that, under GST act, all transactions are direct transaction between JBVNL and Contractor. Therefore, kindly confirm that all custom duties levied on finished goods alone imported from abroad, shall be reimbursed over and above the contract price.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly note that, under GST act, all transactions are direct transaction between JBVNL and Contractor. Therefore, kindly confirm that all custom duties levied on finished goods alone imported from abroad, shall be reimbursed over and above the contract price.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">The Financial bid shall be evaluated on Total price inclusive of all taxes and duties.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(a) all customs and import duties for the Plant specified in Price Schedule No. 1; and</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Nothing shall be paid / reimbursed over and above the contract price.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:249px\">(b) other domestic taxes such as, sales tax and value added tax (VAT) on the Plant specified in Price Schedules No. 1 and No. 2 and that is to be incorporated into the Facilities, and on the finished goods, imposed by the law of the country where the Site is located.</td>\r\n\t\t\t<td style=\"width:248px\">Also, such duties shall be indicated separately and will not be taken for evaluation. Please Confirm.</td>\r\n\t\t\t<td style=\"width:183px\">Also, such duties shall be indicated separately and will not be taken for evaluation. Please Confirm.</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Accordingly, we request you to change the price schedule to incorporate the custom duty applicable against each item.</td>\r\n\t\t\t<td style=\"width:183px\">Accordingly, we request you to change the price schedule to incorporate the custom duty applicable against each item.</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">83</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td style=\"width:249px\">Power shut down of Site locations during meter installation</td>\r\n\t\t\t<td style=\"width:248px\">We understand that JBVNL shall facilitate the power shut down of the site while meter installation. Any delay attributable to this shall not be considered as bidders&rsquo; fault and the corresponding time extension shall be given to bidder. Please Confirm.</td>\r\n\t\t\t<td style=\"width:183px\">We understand that JBVNL shall facilitate the power shut down of the site while meter installation. Any delay attributable to this shall not be considered as bidders&rsquo; fault and the corresponding time extension shall be given to bidder. Please Confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to plan this activity with JBVNL well in advance to avoid any delay</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to plan this activity with JBVNL well in advance to avoid any delay</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">84</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General, 515</td>\r\n\t\t\t<td style=\"width:249px\">The Above mention quantity may be increased during the implementation phase of the project so that Successful bidder shall have to make sure the design/build of communication canopy accordingly including consideration of the consumer that will comes under the division number 8,9 and 10.</td>\r\n\t\t\t<td style=\"width:248px\">Kindly specify the percentage of quantity variation.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly specify the percentage of quantity variation.</td>\r\n\t\t\t<td style=\"width:167px\">This is optional, any additional meter requirement over and above the project quantity, will be paid additionally. However, if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">This is optional, any additional meter requirement over and above the project quantity, will be paid additionally. However, if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:196px\">85</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Right of Way and other statutory clearances</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm that all permission / licenses / local approval and ROW shall be made available by JBVNL to bidder including statutory payment to be made to authorities. Bidder shall only be responsible for co-ordination with concerned authorities.</td>\r\n\t\t\t<td style=\"width:183px\">Please confirm that all permission / licenses / local approval and ROW shall be made available by JBVNL to bidder including statutory payment to be made to authorities. Bidder shall only be responsible for co-ordination with concerned authorities.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Utility will facilitate, however, all the permits/approvals/licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Utility will facilitate, however, all the permits/approvals/ licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">Delay on account of getting such permission shall be considered for time extension, along with cost compensation to be mutually discussed and agreed.</td>\r\n\t\t\t<td style=\"width:183px\">Delay on account of getting such permission shall be considered for time extension, along with cost compensation to be mutually discussed and agreed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">86</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General, -</td>\r\n\t\t\t<td style=\"width:249px\">Space, Electricity, Water etc</td>\r\n\t\t\t<td style=\"width:248px\">We understand that the space, electricity and water supply for storage of items in site/central office etc shall be provided by JBVNL. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">We understand that the space, electricity and water supply for storage of items in site/central office etc shall be provided by JBVNL. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to arrange office cum store for storage of material required for installation</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to arrange office cum store for storage of material required for installation</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">87</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 1.3.7. OPERATION &amp; MAINTENANCE, 155</td>\r\n\t\t\t<td style=\"width:249px\">iii. The successful bidder shall also install the new meters (requirements of smart meters due to new connections/replacement or meter shifting etc.) that come up during the supply and installation period of the contract, including the required infrastructure for acquiring the data from the same.</td>\r\n\t\t\t<td style=\"width:248px\">Kindly provide details about the maximum number of meters to be installed per annum during O&amp;M period.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly provide details about the maximum number of meters to be installed per annum during O&amp;M period.</td>\r\n\t\t\t<td style=\"width:167px\">This is optional, any additional meter requirement over and above the project quantity, will be paid additionally. However, if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">This is optional, any additional meter requirement over and above the project quantity, will be paid additionally. However, if any requirement comes in project area during the execution bidder shall install the meter till total qty of meter under this projects exhaust.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">88</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 1.3. Advanced Metering Infrastructure (AMI) System, 136</td>\r\n\t\t\t<td style=\"width:249px\">4. Implement &amp; commission AMI system capable of upgrades and scaling up as per JBVNL requirements with robust System security features with due consideration of data privacy, confidentiality, cyber security guidelines etc.</td>\r\n\t\t\t<td style=\"width:248px\">Third party cyber security audit from STQC/ CERT-In empanelled vendor is not in Successful bidder&#39;s scope. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">Third party cyber security audit from STQC/ CERT-In empanelled vendor is not in Successful bidder&#39;s scope. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Third party cyber security audit from CERT-In empanelled vendor is in Successful bidder scope.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">89</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, Price Schedule,&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Price Schedule</td>\r\n\t\t\t<td style=\"width:248px\">We presume that ferrule/lugs, switchgear &amp; other accessories are excluded from the scope of bidder. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">We presume that ferrule/lugs, switchgear &amp; other accessories are excluded from the scope of bidder. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Any accessories for successful implementation of the meter will be in bidder scope.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Meter installation accessories like lugs/ screws/ clamps/ nut bolts are in Bidder&#39;s scope.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">90</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, General,&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">General</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL shall promptly take the custody of old uninstalled meters. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL shall prompt take the custody of old uninstalled meters. Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to plan the handing over and taking over old meters with utility well in advance to avoid any last-minute rush</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to plan the handing over and taking over old meters with utility well in advance to avoid any last-minute rush</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"7\" style=\"height:316px\">91</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td style=\"width:248px\">The bidder must meet the following experience criteria&nbsp; in the roles of supplier , contractor , JV partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:183px\">ISO 27001 Certification is required for the information security management</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:249px\">4.1 General Experience</td>\r\n\t\t\t<td style=\"width:248px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 53</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(c) Availability of meter repair facility in India since last 3 years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(d) Availability of in-house NABL accredited Laboratory</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(f) Availability of ISO 27001:2013 Certification</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:254px\">92</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td style=\"width:248px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">Prior experience in Meter installation &amp; cloud hosted applications are must for the bidders, as this project involves 3.5 Lakhs meters installation and cloud hosted applications</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:50px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:249px\">4.2a Specific Experience</td>\r\n\t\t\t<td style=\"width:248px\">4.2a Specific Experience</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:84px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 54</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM</td>\r\n\t\t\t<td style=\"width:248px\">(a) The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(b) The Bidder should have successfully installed 2,00,000 meters (Static /Smart) during the last three financial years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:59px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(c) The Bidder(s) should have managed or deployed or under implementation IT Solution / Applications comprising of Application Hosting on Cloud services to at least 2 clients during last three Financial Years.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:505px\">93</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">4. Technical Qualification Requirement:</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;4.2b Specific Experience</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have executed (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:109px; width:92px\">Section III - Evaluation and Qualification Criteria</td>\r\n\t\t\t<td style=\"width:249px\">4.2b Specific Experience</td>\r\n\t\t\t<td style=\"width:248px\"><s>The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application</s></td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:120px; width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture, 55</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;The Bidder must Bidder(s) should have experience of implementing at least ONE (01) AMI project for any of the utilities in last 5 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">AMI projects Implementation and Integration or under implementation should have covered following components of AMI Projects (Similar to the requirements as laid down in this tender):</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">a) Installation of Smart Meters</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">b) Communication infrastructure</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">c) Head End System (HES)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">d) Meter Data Management System (MDM)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">e) integration of meter with head-end system with MDMS on standard interfaces and data exchange models along with Integration with Legacy system such as MBC, OMS etc</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:180px\">94</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">RFP, 2. Bidder&rsquo;s Qualification</td>\r\n\t\t\t<td style=\"width:249px\">Specific Experience 4.2 c</td>\r\n\t\t\t<td style=\"width:248px\">Alternative to the proposed clause we request you to add the following clause also:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">The RFP proposed experience criteria looks to be favouring few bidders and hence in order to assess the communication experience of the bidder we request you to include this alternate clause also.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:150px; width:92px\">Section III - Evaluation and Qualification Criteria Table 2 - Eligibility and Qualification Criteria for Joint Venture, 55</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:248px\">SWAN or MPLS network experience : The Bidder also should have full technical competence for designing, implementing and maintaining a large scale WAN / MPLS network. The Bidder should have successfully executed or implementing at least ONE project (covering more than 200 Routers / MPLS nodes in a single network for a single client) along with monitoring / management using NMS tools in India of the value more than 100 Cr in the last seven years.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">95</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, ,&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">General</td>\r\n\t\t\t<td style=\"width:248px\">We presume that the complete consumer indexing data along with the network diagram is available in GIS and the bidder need not carry out the same as a part of their survey and implementation activity, please confirm</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">GIS based data will be made available to the Successful bidder. Bidder has to the site survey prior to submit the detailed Engineering Document. Any discrepancy need to brought in notice of JBVNL</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">GIS based data will be made available to the Successful bidder. Bidder has to the site survey prior to submit the detailed Engineering Document. Any discrepancy need to brought in notice of JBVNL</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">96</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">1, 4 ITB, 16</td>\r\n\t\t\t<td style=\"width:249px\">The joint venture agreement should be registered in the place specified in BDS so as to be legally valid and binding on partners.</td>\r\n\t\t\t<td style=\"width:248px\">This is construed as JV Agreement is to be registered and not registration of the JV itself. Further, unincorporated JV (U-JV) is allowed to participate in the tender.Pl remove the necessity to register the JV Agreement.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;The JV Agreement shall be duly stamped on a Rs. 100 Stamp Paper.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;The JV Agreement shall be duly stamped on a Rs. 100 Stamp Paper.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">97</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">1, 6.2 ITB, 19</td>\r\n\t\t\t<td style=\"width:249px\">6.2 The Specific Procurement Notice-Request for Bids (RFB) issued by the Employer is not part of the bidding document</td>\r\n\t\t\t<td style=\"width:248px\">Please include the specific Procurement Notice as a part of the bidding document, every document based on which the bid is submitted, needs to form part of the bidding document.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">98</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">1, 17 ITB, 24</td>\r\n\t\t\t<td style=\"width:249px\">This includes all requirements under the Contractor&rsquo;s responsibilities for testing, pre-commissioning and commissioning of the plant and, where so required by the bidding document, the acquisition of all permits, approvals and licenses, etc.; the operation, maintenance and training services and such other items and services as specified in the bidding document, all in accordance with the requirements of the General Conditions.</td>\r\n\t\t\t<td style=\"width:248px\">What are the approvals, permits and licenses necessary to be obtained by the Contractor?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Utility will facilitate, however, all the permits / approvals / licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Utility will facilitate, however, all the permits / approvals / licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">99</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">1, 20.8 ITB, 29</td>\r\n\t\t\t<td style=\"width:249px\">20.8 The Bid Security of a JV where permitted shall be in the name of the JV that submits the Bid. If the JV has not been legally constituted into a legally enforceable JV at the time of bidding, the Bid Security shall be in the names of all future members as named in the letter of intent referred to in ITB 4.1 and ITB 11.2.</td>\r\n\t\t\t<td style=\"width:248px\">What is the meaning of JV being &quot;legally constituted&quot; or &quot;legally enforceable&quot;? Does it mean it needs to be registered JV?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Yes</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:336px\">100</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">1, 51.1 ITB, 41</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:249px\">51.1 The Employer proposes the person named in the BDS to be appointed as Adjudicator under the Contract, at the daily fee specified in the BDS, plus reimbursable expenses (actual boarding, lodging, travel and other incidental expenses). If the Bidder disagrees with this proposal, the Bidder should so state in his Bid. If, in the Letter of Acceptance, the Employer does not agree on the appointment of the Adjudicator, the Employer will request the Appointing Authority designated in the Particular Conditions of Contract (PCC) pursuant to Clause 46.1 of the General Conditions of Contract (GCC), to appoint the Adjudicator.</td>\r\n\t\t\t<td style=\"width:248px\">We request you to lay down the clear dispute resolution process through arbitration.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:248px\">&nbsp;All disputes and differences arising out of or in connection with this MOU shall first be discussed between the Parties for an amicable solution for 30 days of a notice of dispute or claim by either Party.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:150px; width:248px\">If any disputes or differences between the Parties are not resolved, the same shall be referred for arbitration under the Indian Arbitration and Conciliation Act, 1996 (including its amendments/re-enactments thereto).The arbitral tribunal shall consist of 3 (three) arbitrators &ndash; 1 (one) arbitrator each nominated by each Party and the third arbitrator being nominated by the 2 (two) arbitrators so appointed by the Parties</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">The arbitration proceedings shall be in English and shall take place in Chennai/Mumbai.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:66px\">101</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">1, 51ITB, BDS, 49</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The Adjudicator proposed by the Employer is: _________________[insert name and address of proposed Adjudicator]. The daily fee for this proposed Adjudicator shall be: __________[insert amount in Rupees &ndash; not less than INR 10,000 per day]. The biographical data of the proposed Adjudicator is as follows: ___________________________________________________________ [provide relevant information, such as education, experience, age, nationality, and present position; attach additional pages as necessary]</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Who is the Adjudicator? Please provide the details to appropriately submit our bids.&nbsp; Instead, suggest we have a clear dispute resolution process through arbitration. As per the Conditions of Contract: &ldquo;The Adjudicator&rdquo; is the person appointed jointly by the Employer and the Contractor to resolve disputes in the first instance, as provided for in GCC 46. Please clarify on the dispute resolution mechanism under the Contract and the appointment of the authorities.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Adjudicator not applicable.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:193px\">Dispute resolution as per GCC and India Arbitration and Conciliation Act 1996 and as amended in 2015</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">102</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">1, Appendix to Technical Part</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">This Guarantee will remain in force up to and including the date ____________________4 days after the deadline for submission of Bids as such deadline is stated in the Instructions to Bidders or as it may be extended by the Employer, notice of which extension(s) to the Bank is hereby waived</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The wordings in red may please be removed as this provision in open-ended in the BG and banks do not issue the BGs.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">This Guarantee will remain in force up to and including the date ____________________4 days after the deadline for submission of Bids as such deadline is stated in the Instructions to Bidders. Any demand in respect of this guarantee should reach the Bank not later than the above date.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Form of Bid Security &ndash; Bank Guarantee, 105</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">103</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, 9.7 GCC, 552</td>\r\n\t\t\t<td style=\"width:249px\">9.7 Pursuant to paragraph 2.2 e. of Appendix B to the General Conditions the Contractor shall permit and shall cause its subcontractors and sub-consultants to permit, the Bank and/or persons appointed by the Bank to inspect the Site and/or the accounts and records relating to the procurement process, selection and/or contract execution, and to have such accounts and records audited by auditors appointed by the Bank if requested by the Bank.</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm that such audits will be limited to the accounts maintained for this Project alone.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Audit will be limited to the project related accounts</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Audit will be limited to the project related accounts</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:256px\">104</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, 16.1 GCC, 554</td>\r\n\t\t\t<td style=\"width:249px\">Notwithstanding the above, the Contractor may furnish to its Subcontractor(s) such documents, data and other information it receives from the Employer to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor under this GCC Clause 16.</td>\r\n\t\t\t<td style=\"width:248px\">Please allow for disclosure under legal compulsion and to consultants, agents and advisors engaged for the purpose of the Contract</td>\r\n\t\t\t<td style=\"width:183px\">The Contractor may furnish to its Subcontractor(s), advisors, consultants and agents such documents, data and other information it receives from the Employer to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor under this GCC Clause 16. The Contractor may also disclose the Confidential Information to legal or regulatory authorities to the extent required.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">105</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">, 25.5.2 ; 40.1 GCC, 582, 604</td>\r\n\t\t\t<td style=\"width:249px\">25.5.2 When the Contractor is notified by the Project Manager that he will be unable to proceed with the activities and obligations pursuant to above Sub-Clause 25.5.1, the Contractor shall be entitled to the following:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">&nbsp;Please clarify that under such events giving raise to extension of contract duration, the Employer shall not levy any delay damages on the Contractor, unless the extension is provided due to proven delay attributable to the Contractor.</td>\r\n\t\t\t<td rowspan=\"2\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">(a) the Time of Completion shall be extended for the period of suspension without imposition of liquidated damages pursuant to GCC Sub-Clause 26.2;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">106</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, 30 GCC, 589</td>\r\n\t\t\t<td style=\"width:249px\">That this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the Contractor to indemnify the Employer with respect to patent infringement.</td>\r\n\t\t\t<td style=\"width:248px\">Limitation of liability is not applicable in case of patent infringement or defect rectification- BU to note</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:126px\">107</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">, 39.2 GCC, 601</td>\r\n\t\t\t<td style=\"width:249px\">39.2 Changes Originating from Employer</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">What is the extent to which a change can be ordered? Specify a percent of the contract price, till which a change can be necessary under the contract.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px; width:249px\">39.2.1 If the Employer proposes a Change pursuant to GCC Sub-Clause 39.1.1, it shall send to the Contractor a &ldquo;Request for Change Proposal,&rdquo; requiring the Contractor to prepare and furnish to the Project Manager as soon as reasonably practicable a &ldquo;Change Proposal,&rdquo; which shall include the following</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">108</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, 42.2 GCC, 608</td>\r\n\t\t\t<td style=\"width:249px\">42.2 Termination for Contractor&rsquo;s Default</td>\r\n\t\t\t<td style=\"width:248px\">What are payments that the Contractor is entitled to in case of termination in such event?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:96px\">109</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">, 45 GCC, 615</td>\r\n\t\t\t<td style=\"width:249px\">If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Frequent notifications of the events leading to claim and an aggregate claim raised in the end of the contract, can be entertained. Please confirm and this clause does not amount to waiver of the contractor&rsquo;s right to raise a claim.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">the claim</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">110</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, 46.5 GCC, 617</td>\r\n\t\t\t<td style=\"width:249px\">The Arbitrator(s) shall give a decision in writing within 120 days of start of the proceedings unless otherwise agreed to by the Parties. The Arbitrators shall entertain only those issues which have been earlier referred to the Adjudicator and either party is dissatisfied with the decision given by the Adjudicator.</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm that all disputes under the contract, can be referred to the arbitrator and the Arbitration shall be conducted as the Indian Arbitration &amp; Conciliation Act of 1996 (amendments and re-enactments thereto)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">111</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, PC 46, 640</td>\r\n\t\t\t<td style=\"width:249px\">g) The Arbitrator should give final award within 180 days of starting of the proceedings, unless otherwise agreed to by the Parties.</td>\r\n\t\t\t<td style=\"width:248px\">The timelines of the arbitration and the manner of appointment shall be as per the Indian Arbitration &amp; Conciliation Act of 1996 (amendments and re-enactments thereto). Please confirm. Further, suggest we have same dispute resolution mechanisms under both GCC and O&amp;M Contracts.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">112</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">, Appendix 2. Price Adjustment, 652</td>\r\n\t\t\t<td style=\"width:249px\">Appendix 2. Price Adjustment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Please provide for suitable price adjustment if allowed under the contract.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">The prices shall remain firm and fixed for the duration of the Contract.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:121px\">113</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, Advance Payment Security</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">This guarantee shall remain valid and in full effect from the date of the advance payment under the Contract until _________________________ [name of Employer] receives full repayment of the same amount from the Applicant. Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Please provide an expiry or end date for the Advance BG. This will be without prejudice to the rights of the Employer to seek for the contractor to extend and keep the BG alive till the advance money is paid fully, as under the contract. But in the BG, request to provide an end date.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">ABG should be valid for the implementation period (i.e. 24 months) from the date of contract agreement.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">Demand Guarantee</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">[Guarantor letterhead or SWIFT identifier code], 666</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:181px\">114</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, Clause 4- Tripartite Agreement, 672</td>\r\n\t\t\t<td style=\"width:249px\">c) JBVNL reserves the right to terminate this Agreement at the risk and cost of&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.(Name of 2nd Party), in case the termination notice served under clause (a) or 4 (b).4. JBVNL reserves the right to levy liquidated damage, which Parties considered to be genuine estimate for the default or delay pertaining to service or product pursuant to this Agreement by TSP or BIDDER. Such damages shall be levied @ of&hellip;.. for each day of delay or default subject to the maximum of 10% of the contract value. Also, JBVNL reserve the right to terminate this Agreement at the risk and cost of TSP and/or BIDDER once the liquidated damages reached the maximum permissible limit under this Agreement</td>\r\n\t\t\t<td style=\"width:248px\">Please remove this line. The risk &amp; cost obligations need to be taken up by the TSP.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:126px\">115</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">698 of pdf</td>\r\n\t\t\t<td style=\"width:249px\">15. ASSIGNMENT AND SUBCONTRACTING</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Please delete this clause</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px; width:249px\">15.1 The Service Provider shall not sublet, transfer or assign the contract or any part thereof without the prior written permission of Employer. The Service provider shall not subcontract any of the Services having a value of more than 50% of the Annual O&amp;M Price of the concerned year, except upon the Employer&rsquo;s advance written approval of the subcontracting of such works.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">116</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T ECC</td>\r\n\t\t\t<td style=\"width:92px\">, GCC, PCC and O&amp;M Contracts.,&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Termination for Employer&rsquo;s Convenience</td>\r\n\t\t\t<td style=\"width:248px\">Please provide for suitable compensation in case of termination at employer&#39;s convenience, apart from work done payments</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:151px\">117</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause Table 3 - Eligibility and Qualification Criteria for Single Bidder (without JV)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Non-performance of a contract did not occur within the last Five (5) years prior to the deadline for application submission, based on all information on fully settled disputes or litigation.&nbsp; A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the Bidder have been exhausted.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request JBVNL to modify this clause for Similar Project including AMI/AMR&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">L&amp;T execute various EPC projects via different Business verticals.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">2. History of non-performing contracts, page no.57</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:181px\">118</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause Table 3 - Eligibility and Qualification Criteria for Single Bidder (without JV)</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Request for amendment&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must has successfully executed AMI/AMR of at least 36,000 meters/Nodes.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">4. Technical Qualification requirement</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">4.2b Specific Experience, page no.60</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">119</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause PCC 8. Time for Commencement and Completion, page no.635</td>\r\n\t\t\t<td style=\"width:249px\">PCC 8.2 The Time for Completion of the whole of the Facilities shall be 24 months for implementation and 60 months for O&amp;M from the Effective Date as described in the Contract Agreement.</td>\r\n\t\t\t<td style=\"width:248px\">Based on our experience of Such Project, request JBVNL to extend the implementation schedule from 24 months to 36 months</td>\r\n\t\t\t<td style=\"width:183px\">PCC 8.2 The Time for Completion of the whole of the Facilities shall be 36 months for implementation and 60 months for O&amp;M from the Effective Date as described in the Contract Agreement.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have executed (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:141px\">120</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 1.3 Advanced Metering Infrastructure (AMI) System, page no.136</td>\r\n\t\t\t<td style=\"width:249px\">Deployment of HES/NMS application on Cloud. Bidder has to provide HES on Cloud on monthly chargeable basis till JBVNL provide/arrange the cloud service provider for the period not more than 1 year. The period may be extended further subject to mutual agreement of JBVNL and Bidder by reviewing the upcoming Cloud services possibility under another RFP. Details about the cloud sizing requirement may be referred to clause no. 1.3.6.(Requirement of IT</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">It is important to note that cloud services for shorter period is not economical. Also re-implementation of the HES/NMS solution to another cloud provider will require significant effort in terms of installation &amp; configuration effort including 3G/4G network configuration. Also, in case the volume of meter installation is significant while migrating to a new CSP, the data migration &amp; black-out period could be significant. We propose that the implementer should cost for cloud only for limited number of meter installation i.e. up to 20000 metering points. We assume Utility&#39;s CSP will be onboarded by this time &amp; beyond this number of metering point the utility&#39;s chosen CSP will be used. Kindly confirm.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">infrastructure on cloud)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:181px\">121</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Clause Table 3 - Eligibility and Qualification Criteria for Single Bidder (without JV), page no.58</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:249px\">Submission of audited balance sheets or if not required by the law of the Bidder&rsquo;s Country, other financial statements acceptable to the Employer, for the last five [5] years to demonstrate the current soundness of the Bidders financial position and its prospective long-term profitability.</td>\r\n\t\t\t<td style=\"width:248px\">Bidder understands that to substantiate Current soundness of Financial positional and its prospective long-term profitability, following documents need to be submitted along with the bid.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Bidder to showcase prospective long-term profitability andtheir balance sheet should be positive in last 5 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">1. Audited Proof of Profitability for last five years .</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">2. Earning call of Company which is available in public domain.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">JBVNL is requested to confirm the above requirement.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">122</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3 Advanced Metering Infrastructure (AMI) System, page no.136</td>\r\n\t\t\t<td style=\"width:249px\">Prepare Implementation Plan based on actual field survey</td>\r\n\t\t\t<td style=\"width:248px\">The clause indicates that the implementor need to carry out actual field survey, create implementation plan and then subsequently carry out actual work. Kindly confirm the same as detailed field survey will have commercial impact.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Yes, a survey is to be done before commencement of work</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes, a survey is to be done before commencement of work</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">123</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1.3 Advanced Metering Infrastructure (AMI) System, page no.137</td>\r\n\t\t\t<td style=\"width:249px\">Figure 1 General Architecture of AMI System and Integration with Other System</td>\r\n\t\t\t<td style=\"width:248px\">The architecture diagram indicates &quot;Manual meter reading support&quot;. Kindly note that manual meter reading support can be achieved by MDM using a separate HES or BCS software and not by the AMI HES. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed, it will be handled in MDM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">124</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 3.4, page no.53</td>\r\n\t\t\t<td style=\"width:249px\">Net Worth for average of the last three Financial Years should be positive.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Please note that average value would not be the right metric of evaluation since it isn&#39;t arithmetically accurate. Request to amend it to &quot;Net Worth for each of the last three Financial Years should be positive&quot;.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Net Worth for each of the last three Financial Years should be positive</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">125</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 4, page no.77</td>\r\n\t\t\t<td style=\"width:249px\">Technical Annexure-4 - Technical Specification for CTPT operated AC Three Phase Four Wire HT Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Meter Box.</td>\r\n\t\t\t<td style=\"width:248px\">Specifications are missing in the Tender document. Request provide the same</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Kindly refer annexure-4</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Kindly refer annexure-4</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:106px\">126</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause c, page no.135</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">c) Supply/Planning/Setup/tuning of RF Mesh Communication Infrastructure including Network Management (NMS) &amp; Head End System (HES) for the project area. HES, NMS and associated Software should be scalable of handling at least 10,00,000 Meters.</td>\r\n\t\t\t<td style=\"width:248px\">This clause is in contradiction with the BoQ row element stating that</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">&quot;One time Head End System (HES) base software perpetual License for 3,62,655 consumers (scalable up to 5,00,000 consumers)&quot;. Please clarify the range of scalability.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:81px\">127</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 2, page no.166</td>\r\n\t\t\t<td style=\"width:249px\">&gt;= 90% to &lt; 99%*&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request to remove the additional penalty clause as the penalty is over and above the loss of revenue incurred by the bidder for non-reporting meters.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">No payment towards non-reporting consumer Meters. Additionally, penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of the vendor.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:41px\">128</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 5.4, page no.172</td>\r\n\t\t\t<td style=\"width:249px\">Base Current (Ib) &ndash; 5 Amps.&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request to amend the current rating as 10-60 A for single phase smart meters. The meters would fulfil the starting current and accuracy requirements as per 5-30 A meters, while they will be able to also handle larger currents, thus providing longer range along with ensuring accuracy.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">1 Ph Smart meter current rating as 10-60 Amp</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">1 Ph Smart meter current rating as 5-30 Amp</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">Maximum Current (Imax) - 30 Amps.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">129</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 3e, page no.176</td>\r\n\t\t\t<td style=\"width:249px\">(ETBC). The ETBC shall be extended by minimum 50mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover for providing numbered double anchor polycarbonate lash wire seal, which shall be supplied loose by the bidder as per technical specification of Polycarbonate Seals.</td>\r\n\t\t\t<td style=\"width:248px\">Request to modify it to 30mm&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">130</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 13, page no.178</td>\r\n\t\t\t<td style=\"width:249px\">e)The make of the load switch should be of Gruner / KG Technologies (German) make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:248px\">This is a restrictive clause. The choice of components used should be with the bidder considering factors like design flexibility, component availability and delivery commitments&nbsp; without compromising on the quality and performance of the product. Request delete this clause</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">e)The make of the load switch should be of Gruner / KG Technologies (German) or Equivalent make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">e)The make of the load switch should be of Gruner / KG Technologies (German) or Equivalent make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">131</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 14, page no.179</td>\r\n\t\t\t<td style=\"width:249px\">Utilization category of the load switch Shall comply IS 15884</td>\r\n\t\t\t<td style=\"width:248px\">IS 15884 doesn&#39;t specify the utilization category of the load switch. Hence, we request you to confirm that UC2 shall be provided in single phase meter.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">UC2 or better for 1 Ph &amp; 3 Ph WC Smart Energy meter</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">UC 1 for 1 Ph meters and UC2 for 10-60A 3PH WCM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">132</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 2, page no.181</td>\r\n\t\t\t<td style=\"width:249px\">Advanced security outlined in clause 7.1.2 of IS 15959 (Part 1) shall be provided.</td>\r\n\t\t\t<td style=\"width:248px\">The reference standards shall be amended as IS 15959 (Part 2)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Any latest amended to be complied</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Any latest amended to be complied</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">133</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 8.4, page no.188</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence and restoration of following Voltage related events shall be logged in meter memory.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The clause is incomplete. Please specify the voltage events for which logging needs to be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Pls refer annexure -5 for Tamper events</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Pls refer annexure -5 for Tamper events. Moreover all the tamper event as per relevant IS and CBIP to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">b. For each occurrence event captured, the cumulative tamper count shall be incremented</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">134</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 8.8, page no.188</td>\r\n\t\t\t<td style=\"width:249px\">a) Occurrence and restoration of following events shall be logged in meter memory as per table A8 of IS 15959 (Part 2)</td>\r\n\t\t\t<td style=\"width:248px\">The clause is incomplete. Please specify the events for which logging needs to be provided.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer annexure -5 for Tamper events</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">Pls refer annexure -5 for Tamper events. Moreover all the tamper event as per relevant IS and CBIP to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">135</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 8.14, page no.189</td>\r\n\t\t\t<td style=\"width:249px\">The meter shall not get affected by any remote control device &amp; shall continue recording energy under any one or combinations of the following conditions:</td>\r\n\t\t\t<td style=\"width:248px\">Request change the clause to &quot;The meter shall not get affected by any remote control device specified under CBIP 325 &amp; shall continue recording energy &quot;&#39;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Clause deleted</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Clause deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">136</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 11a, page no.194</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Optical port should be provided with at least 1-mtr cable, having optical sensor at one end and USB 3.0 or higher connector on other end. Cable should be suitable for downloading meter data.</td>\r\n\t\t\t<td style=\"width:248px\">Meter data transfer is at 9.6kbps (min) as per previous clause.&nbsp; Hence request to keep the USB version as 1.1 or higher.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed, however provision of reading meter through optical port should be kept there as a fall back arrangement in case RF fails.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">Supply of optical cable is not required for each meter since data communication will be done over RF. Hence request remove the requirement of cables.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:226px\">137</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 12.1.3, page no.195</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision</td>\r\n\t\t\t<td style=\"width:248px\">The Technical Qualification clause 4.1 states that &quot;Availability of IS 16444 certificates for at least one type of electricity meter.&quot;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px; width:248px\">However the indicated clause call for type test certificate as per IS 16444 for each type of meter mandatorily without which bid will not be considered.&nbsp; This is in contravention to the technical Qualification clause. Request amend these clauses in line with the Technical Qualification clause 4.1, &quot;Availability of IS 16444 certificates for at least one type of electricity meter.&quot;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"11\" style=\"height:221px\">138</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:92px\">Clause , page no.196</td>\r\n\t\t\t<td style=\"width:249px\">Following documents shall be sent along with material:</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:248px\">The project is for supply, installation and O&amp;M of the smart meters. After dispatch, the meters would be available with the bidder for the installation process. Hence the highlighted documents will be available with the bidder in the soft copy format for verification/usage by JBVNL. Request to amend the clause suitably.</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:167px\">Agreed, however on request bidder will furnish all the details as utility requirement</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"11\" style=\"width:193px\">Agreed, however on request bidder will furnish all the details as utility requirement</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">a. Govt. certified/accredited lab testing certificate</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">b. Meter Test reports</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">c. MDCC issued by JBVNL</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">d. Invoice in duplicate</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">e. Packing list</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">f. Drawings &amp; catalogue</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">g. Guarantee / Warranty card</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">h. Delivery Challan</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">i. Other Documents (as applicable)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">j. One no. leaflet with each meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:196px\">139</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 17, page no.199</td>\r\n\t\t\t<td style=\"width:249px\">Component Specifications</td>\r\n\t\t\t<td style=\"width:248px\">The choice of components used should be with the bidder considering factors like design flexibility, component availability and delivery commitments&nbsp; without compromising on the quality and performance of the product. The bidder is responsible for the supply of the product and O&amp;M of the project. The responsibility of product performance rests with the bidder. Hence the restrictions placed on the component specifications can be removed.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to refer this amendment and existing clauses for component list and to be comply</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">140</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 14, page no.227</td>\r\n\t\t\t<td style=\"width:249px\">Utilization category of the load switch shall comply IS 15884.</td>\r\n\t\t\t<td style=\"width:248px\">IS 15884 doesn&#39;t specify the utilization category of the load switch. Hence, we request you to confirm that UC2 shall be provided in three phase meter.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">UC2 or better for 1 Ph &amp; 3 Ph WC Smart Energy meter</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">UC 1 for 1 Ph meters 5-30A and UC2 for 10-60A 3PH WCM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">141</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 8.4, page no.236</td>\r\n\t\t\t<td style=\"width:249px\">a) Occurrence and restoration of following Voltage related events shall be logged in meter memory.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The clause is incomplete. Please specify the voltage events for which logging needs to be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Pls refer annexure-5</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Pls refer annexure-5</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">b) For each occurrence event captured, the cumulative tamper count shall be incremented</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">142</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 8.7, page no.236</td>\r\n\t\t\t<td style=\"width:249px\">Occurrence and restoration of following events shall be logged in meter memory as per table A8 of IS 15959 (Part 2).&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">The clause is incomplete. Please specify the events for which logging needs to be provided.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer annexure-5</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">Pls refer annexure-5</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">143</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 8.12, page no.238</td>\r\n\t\t\t<td style=\"width:249px\">The meter shall not get affected by any remote control device &amp; shall continue recording energy under any one or combinations of the following conditions:</td>\r\n\t\t\t<td style=\"width:248px\">Request change the clause to &quot;The meter shall not get affected by any remote control device specified under CBIP 325 &amp; shall continue recording energy &quot;&#39;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">144</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 12, page no.241</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Optical port should be provided with at least 1-mtr cable, having optical sensor at one end and USB 3.0 or higher connector on other end. Cable should be suitable for downloading meter data.</td>\r\n\t\t\t<td style=\"width:248px\">Meter data transfer is at 9.6kbps (min) as per previous clause.&nbsp; Hence request to keep the USB version as 1.1 or higher.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed, however provision of reading meter through optical port should be kept there as a fall back arrangement in case RF fails.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">Supply of optical cable is not required for each meter since data communication will be done over RF. Hence request remove the requirement of cables.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:226px\">145</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 30, page no.242</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision.</td>\r\n\t\t\t<td style=\"width:248px\">The Technical Qualification clause 4.1 states that &quot;Availability of IS 16444 certificates for at least one type of electricity meter.&quot;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px; width:248px\">However the indicated clause call for type test certificate as per IS 16444 for each type of meter mandatorily without which bid will not be considered.&nbsp; This is in contravention to the technical Qualification clause. Request amend these clauses in line with the Technical Qualification clause 4.1, &quot;Availability of IS 16444 certificates for at least one type of electricity meter.&quot;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:196px\">146</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 35, page no.247</td>\r\n\t\t\t<td style=\"width:249px\">Component Specifications</td>\r\n\t\t\t<td style=\"width:248px\">The choice of components used should be with the bidder considering factors like design flexibility, component availability and delivery commitments&nbsp; without compromising on the quality and performance of the product. The bidder is responsible for the supply of the product and O&amp;M of the project. The responsibility of product performance rests with the bidder. Hence the restrictions placed on the component specifications can be removed.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:186px\">147</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 8, page no.276</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">b) Meter shall comply requirement of clause 6.9 and 12.5 of IS 13779.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">IS 13779 is not applicable for CT operated meters.&nbsp; Request amend to IS 14697.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">b) Meter shall comply requirement of clause 12.5 of IS 14697.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">148</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 14, page no.277</td>\r\n\t\t\t<td style=\"width:249px\">b) As per clause no 1.2(b) of IS 16444 Part -1. Meter should have provision of communication module with both the variant mentioned in IS 16444 Part-1. This module should be able to connect NAN or WAN (as per the plugged module RF or GSM) for two-way communication.</td>\r\n\t\t\t<td style=\"width:248px\">IS 16444 Part-1 is not applicable for CT operated meters.&nbsp; Request amend to IS 16444 Part-2.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Clause deleted</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Clause deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">149</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 1, page no.286</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence and restoration of following current related events shall be logged in meter memory as per table A5 of IS 15959 (Part2).</td>\r\n\t\t\t<td style=\"width:248px\">Table A5 of IS 15959 (Part2) is defined for single phase meters. Request change to&nbsp; IS 15959 (Part3)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">150</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 2, page no.286</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence and restoration of following Power related events should be logged in meter memory as per table A6 of IS 15959 (Part 2).</td>\r\n\t\t\t<td style=\"width:248px\">Table A6 of IS 15959 (Part2) is defined for single phase meters. Request change to&nbsp; IS 15959 (Part3)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">151</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 4, page no.286</td>\r\n\t\t\t<td style=\"width:249px\">a) Occurrence and restoration of following Voltage related events shall be logged in meter memory.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The clause is incomplete. Please specify the voltage events for which logging needs to be provided.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Pls refer annexure-5</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Pls refer annexure-5</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">b) For each occurrence event captured, the cumulative tamper count shall be incremented</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">152</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 7, page no.286</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence and restoration of following events shall be logged in meter memory as per table A8 of IS 15959 (Part 2).</td>\r\n\t\t\t<td style=\"width:248px\">Table A8 of IS 15959 (Part2) is defined for single phase meters. Request change to&nbsp; IS 15959 (Part3)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer annexure-5</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">Pls refer annexure-5</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">153</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 10, page no.287</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence of following non-rollover events shall be logged in meter memory as per table A9 of IS 15959 (Part 2).</td>\r\n\t\t\t<td style=\"width:248px\">Table A9 of IS 15959 (Part2) is defined for single phase meters. Request change to&nbsp; IS 15959 (Part3)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">154</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 13, page no.288</td>\r\n\t\t\t<td style=\"width:249px\">Captured parameters mentioned above are to be captured when event occurrence and restoration is logged as per table A11 of IS 15959 (Part 2).</td>\r\n\t\t\t<td style=\"width:248px\">Table A11 of IS 15959 (Part2) is defined for single phase meters. Request change to&nbsp; IS 15959 (Part3)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">155</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause 4, page no.290</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">b. Bidder shall ensure integration of software with any of JBVNL system during the life of meter free of cost. JBVNL will provide all the required support for integration activity.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">The scope of integration will be only AMI system. No other system integration are in bidder&#39;s scope.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:181px\">156</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 50, page no.292</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision.</td>\r\n\t\t\t<td style=\"width:248px\">The Technical Qualification clause 4.1 states that &quot;Availability of IS 16444 certificate for at least one type of electricity meter.&quot;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px; width:248px\">However the indicated clause call for type test certificate as per IS 16444 for each type of meter mandatorily without which bid will not be considered.&nbsp; This is in contravention to the technical Qualification clause. Request amend these clauses in line with the Technical Qualification clause 4.1, &quot;Availability of IS 16444 certificate for at least one type of electricity meter.&quot;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:158px\">157</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 19.2, page no.300</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">LT meter box shall contain two separate chambers. The upper chamber shall be suitable to house 3 phase 4 wire energy meter. The lower chamber of the box is intended for housing 04 nos. ring type LT CTs. Both the chambers of box shall be independent from each other.</td>\r\n\t\t\t<td style=\"width:248px\">We understand that the scope of supply include LTCT smart meter with SMC box.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">CTs is also part of supply and 04 CTs per meter are to be supplied and installed.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">External ring type CTs are not scope of the bidder.</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:211px\">158</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">Clause 8.1 &amp; 8.2, page no.635</td>\r\n\t\t\t<td style=\"width:249px\">PCC 8.1 The Contractor shall commence work on the Facilities from the Effective Date for determining Time for Completion as specified in the Contract Agreement.</td>\r\n\t\t\t<td style=\"width:248px\">Bidder understands that Effective date of contract shall start after fulfilling below conditions,</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Effective date will be the date of execution of contract agreement.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">1)&nbsp; This Contract Agreement has been duly executed for and on behalf of the Employer and the Contractor</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:249px\">PCC 8.2 The Time for Completion of the whole of the Facilities shall be 24 months for implementation and 60 months for O&amp;M from the Effective Date as described in the Contract Agreement</td>\r\n\t\t\t<td style=\"width:248px\">2) The Contractor has submitted to the Employer the Performance Security and the advance payment guarantee</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">3) The Employer has paid the Contractor the advance payment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">4) Employer has handed over the clear site fronts and site details to supplier</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:181px\">159</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause PCC 13. Securities, page no.636</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Performance Bank Guarantee</td>\r\n\t\t\t<td style=\"width:248px\">1) We understand that the Performance Security shall be reduced to 10% of O&amp;M cost upon operational acceptance &amp; shall become null &amp; void&nbsp; after 365 days from operational acceptance or 540 days from completion of facilities, whichever comes earlier.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bidder will not be held liable for any reason which are not attributable to bidder</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder will not be held liable for any reason which are not attributable to bidder</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:248px\">2) In case the operational acceptance or completion of facilities gets delayed beyond 24 months from the effective date of contract due to reasons not attributable to the contractor, then the performance security shall be reduced to 10% of O&amp;M cost.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">160</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause PCC 14 Taxes and Duties, page no.636</td>\r\n\t\t\t<td style=\"width:249px\">While making payment taxes will be deducted at source (TDS) as per Indian Income Tax Act and issue TDS Certificate to the contractor, as applicable.</td>\r\n\t\t\t<td style=\"width:248px\">Monthly TDS certificate shall be issued by the Employer.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">TDS certificate will be issue as per standard organisation practice and / or world bank guidelines</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">TDS certificate will be issue as per standard organisation practice and / or world bank guidelines</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">161</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 11 Contract Price, page no.554</td>\r\n\t\t\t<td style=\"width:249px\">Contract Price shall be a firm lump sum not subject to any alteration, except in the event of a Change in the Facilities or as otherwise provided in the Contract.</td>\r\n\t\t\t<td style=\"width:248px\">Request to amend&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Contract Price shall be a firm lump sum not subject to any alteration, except in the event of a Change in the Facilities, delay in project leading to contractors&rsquo; cost escations due to reasons not attributable to the contractor or as otherwise provided in the Contract.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">162</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 19.6, page no.636</td>\r\n\t\t\t<td style=\"width:249px\">GCC 19.6 &ndash; The Contractor in his contract with OEM of NIC Cards/ Router /DCU / Collector shall include provisions that JBVNL shall reserve the right to sign an agreement directly with the OEM/sub-contractor of the NIC cards/Routers/DCU/Collectors for the purchase of any additional such equipment beyond the order quantity or any future requirements. An unpriced copy such contract will be provided to JBVNL</td>\r\n\t\t\t<td style=\"width:248px\">Lead bidder shall be the Single point of contact for the Employer for complete Project Life Cycle. Any additional requirement shall be done through Lead bidder only. JBVNL can do agreement with the Subcontractor after receipt of last payment of final quarter of O&amp;M.&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">163</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause PCC 25. Commissioning and Operational Acceptance, page no.637</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Additional Clause</td>\r\n\t\t\t<td style=\"width:248px\">Request to delete:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">Point no. (c ) (i) (5) - 5. Any other work not included in this RFP but necessary for this project success.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:186px\">164</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause PCC 47, page no.641</td>\r\n\t\t\t<td style=\"width:249px\">Add a new Clause</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Bidder understand that four separate O&amp;M contract stands for Four phase of Project.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Yes</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Yes</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px; width:249px\">For the purposes of ease of contract administration, administration and funding requirements , as stated in Bid Data Sheet Clause &hellip;&hellip;&hellip; , the Employer will enter into four separate O&amp;M contracts in the format attached to this Section as Annex1. The provisions of the O&amp;M contracts are to be read in conjunction with the provisions of the GCC and PCC hereinabove . The breach in any of the contracts will automatically construe breach in all other contracts and all remedial measures will apply</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:326px\">165</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:92px\">Clause 12, page no.648</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:249px\">Appendix 1.&nbsp; Terms and Procedures of Payment</td>\r\n\t\t\t<td style=\"width:248px\">Request to change the Payment Schedule - 2</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Payment terms :</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">1) 60% to be changed to 75%</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">2) 5% against data availability in HES</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">3) 5% against consumer reports</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:248px\">4) 5% against complete project operational acceptance.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:248px\">For payment of 10% (5%+5%) retention, cap dates needs to be defined in case of delay in the project.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:248px\">Documents :</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:248px\">1) Original and six copies of negotiable, clean, on-board bill of lading marked freight prepaid and six copies of non-negotiable bill of lading. - Not applicable since this is domestic supply.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">2) Certificate of Origin - Not applicable since this is domestic&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:271px\">166</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Clause 12, page no.650</td>\r\n\t\t\t<td style=\"width:249px\">Schedule - 3 : Design Services :</td>\r\n\t\t\t<td style=\"width:248px\">1) For Schedule 3 (Design services) within 14 days project manager shall approve drawings/documents. In case Employer delays the approval then the same shall be considered as deemed acceptance.(Plz refer clause 20.3.2 page 564)</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">Schedule - 4 : Installation Services :&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">2) For Schedule 4 (Installation Services) : 80% payment employer&#39;s authorization to be done within 3 days from the date of submission.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">3) For Schedule 4&nbsp; point no. (c) - &quot;Phase Wise&quot; word to be included before &quot;Operational Acceptance Certificate&quot;.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">4) For 5%+5% retention payment cap date to be defined in case of delay in project. Employer&rsquo;s authorization to be done within 3 days from the date of submission.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">167</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 13, page no.555</td>\r\n\t\t\t<td style=\"width:249px\">Performance Security to be submitted within 28 days from the notification of contract award.</td>\r\n\t\t\t<td style=\"width:248px\">Request to JBVNL to allow Contractor to furnish Performance Security before release of first supply payment</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"7\" style=\"height:306px\">168</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:92px\">Clause PCC 26. Completion Time Guarantee, page no.639</td>\r\n\t\t\t<td style=\"width:249px\">PCC 26.2</td>\r\n\t\t\t<td style=\"width:248px\">Request JBVNL to amend LD terms as :</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">Applicable rate for liquidated damages: 0.5%) per week, and the maximum shall not exceed ten percent (10%) of the Contract price</td>\r\n\t\t\t<td style=\"width:248px\">1) Applicable liquidated damages should be 0.25% per week maximum of 5% on un-delivered portion.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:249px\">The above rate applies to the price of the part of the Facilities, as quoted in the Price Schedule, for that part for which the Contractor fails to PCC 26.3. No bonus will be given for earlier Completion of the Facilities or part thereof.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Request JBVNL to confirm the following;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">2) O&amp;M portion to be excluded from the LD liability.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">3) LD shall be applicable only if the contractor fails to deliver/perform due to reasons solely attributable to the contractor</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">4) LD should be levied only if delay analysis is signed off between Employer and contractor and it is established that the delay is on account of contractor.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:241px\">169</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Clause PCC 27. Defect Liability, page no.639</td>\r\n\t\t\t<td style=\"width:249px\">The Defect Liability Period shall be five hundred and forty (540) days from the date of Completion of the Facilities (or any part thereof) or one year from the date of Operational Acceptance of the Facilities (or any part thereof), whichever first occurs</td>\r\n\t\t\t<td style=\"width:248px\">1) This clause is open ended hence Defect liability period should be capped from the date of supply.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">2) Clause 27.10 : Extended defect liability period for Smart Meters along with communication module, DCU along with Power Supply&nbsp; , Collector, NIC, and the period shall be 5 (Five) years from the date of operational acceptance. This also needs to be capped from supply date.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:249px\">PCC 27.10 The critical components covered under the extended defect liability are Smart Meters along with communication module, DCU along with Power Supply , Collector, NIC, and the period shall be 5 (five) years from the date of operational acceptance.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">170</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 20.1, page no.563</td>\r\n\t\t\t<td style=\"width:249px\">Specifications and Drawings</td>\r\n\t\t\t<td style=\"width:248px\">Request for reduction of review time from 14 days to 7 days.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:376px\">171</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 31, page no.589</td>\r\n\t\t\t<td style=\"width:249px\">Transfer of Ownership</td>\r\n\t\t\t<td style=\"width:248px\">Request JBVNL to incorporate clause for Ownership should transfer on receipt of complete payments.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&quot;Title to the materials shall pass to the Employer from the contractor only upon receipt of the total Contract amount as provided under the Contract and the materials shall be deemed to be in the possession of the Employer till total Contract amount is received by the contractor. In the event of non-payment of the total Contract amount or any part thereof including contractor&#39;s claims as per the terms of the Contract, the contractor reserves the right of disposal of the materials. In the above event, the contractor, without prejudice to its other rights and remedies under the Contract, may enter the site to repossess the materials to remove and dispose of the materials without any liability for any damage to the Employer or any other third party. Employer shall not be allowed to use the material till the payment is received by the contractor.&quot;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">172</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 37, page no.596</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Force Majeure</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request to incorporate</td>\r\n\t\t\t<td style=\"width:183px\">Please include below &quot;must have elements&quot; as per approved risk matrix,</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:183px\">Act of God, explosion and implosion, Revolt.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">173</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 39.1, page no.600</td>\r\n\t\t\t<td style=\"width:249px\">H. Change in Contract Elements</td>\r\n\t\t\t<td style=\"width:248px\">Request to incorporate</td>\r\n\t\t\t<td style=\"width:183px\">1) Change in contract element should cover (a) Change in scope of work (b) Variation in quantities beyond +/- 5% (c) Price variation&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:166px\">174</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Clause 40, page no.604</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Extension of Time for Completion</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Below additional conditions to be added apart from conditions mentioned in clause no. 40.1.</td>\r\n\t\t\t<td style=\"width:183px\">g) Delays attributable to the Employer shall include but not limited to delay in site fronts, delay in document approval, delay in release of payments, delay in statutory approvals, delay in availability of Employer&#39;s personnel etc.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:183px\">i) Any other delay beyond the reasonable control of the contractor.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">175</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s L&amp;T EBG</td>\r\n\t\t\t<td style=\"width:92px\">Clause 43, page no.614</td>\r\n\t\t\t<td style=\"width:249px\">Assignment : 43.1 Neither the Employer nor the Contractor shall, without the express prior written consent of the other Party, which consent shall not be unreasonably withheld, assign to any third Party the Contract or any part thereof, or any right, benefit, obligation or interest therein or thereunder, except that the Contractor shall be entitled to assign either absolutely or by way of charge any monies due and payable to it or that may become due and payable to it under the Contract.</td>\r\n\t\t\t<td style=\"width:248px\">Request Amendment as mentioned</td>\r\n\t\t\t<td style=\"width:183px\">&ldquo;The Contractor shall be entitled to make any change in its constitution, by transfer of substantial shareholding or merger or consolidation, and assign its rights and obligations under this Contract with prior intimation to Owner of such change before such assignment of Contract. The Owner consents to execute such necessary agreements hereinafter with the successor.&rdquo;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">176</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page no -58 -3.1&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Table -3 Eligibility and Qualification Criteria for Single Bidder (without JV) Financial Capabilities Submission of audited balance sheets or if not required by the law of the Bidder&rsquo;s Country, other financial statements acceptable to the Employer, for the last five [5] years to demonstrate the current soundness of the Bidders financial position and its prospective long-term profitability.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We understand that to check financial position and its prospective long term profitability bidder need to submit following documents. 1. Documents to demonstrate profitability for last 5 years Please confirm.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to showcase prospective long term profitability and their balance sheet should be positive in last 5 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">177</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page no -58 -3.2&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Average Annual Turnover ( Table 2 &amp; 3) Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Being a prestigious &amp; high value project the bidder&rsquo;s financial position should be sound hence subject clause should be amend as :-Average Annual Turnover Minimum average annual turnover (MAAT) of INR 4000 Million in last three (03) financial years ending 31st March 2018&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Average Annual Turnover Minimum average annual turnover (MAAT) of INR 4000 Million in last three (03) financial years ending 31st March 2018&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">178</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Estimated cost of complete project&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm the estimated cost of complete project.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;Will not disclose as per our policy</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">179</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page no-61-4.2c</td>\r\n\t\t\t<td style=\"width:249px\">Technical requirement &ndash; The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent) shall be applicable on the Performance Security.</td>\r\n\t\t\t<td style=\"width:248px\">We would like to highlight that subject experience is not done by any Indian manufacturer in India. This is against the Prime Ministers &ldquo;Make in India&rdquo; concept .So, such privilege of 2 % rebate should be extended only to Indian manufacturer using subcontractor experience to meet this requirement.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">No restriction for any Indian Manufacturer in participation</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">2% rebate is deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">180</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Schedule 2- page -114</td>\r\n\t\t\t<td style=\"width:249px\">LT XLPE Cable 2 Core 10mm2 Armoured&mdash;181171.90 mtr</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm the length of cable per consumer.&nbsp; Please provide approved vender list of all type of cables suppliers.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Approx. 07 mtrs</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Approx. 07 mtrs</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">181</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Schedule 2- page -114</td>\r\n\t\t\t<td style=\"width:249px\">LT XLPE Cable 3.5 Core 25mm2 Armoured LT XLPE Cable 3.5 Core 50mm2 Armoured</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm the length of cable per consumers.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Approx. 07 mtrs</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Approx. 07 mtrs</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">182</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page 114</td>\r\n\t\t\t<td style=\"width:249px\">Single phase &amp; three phase meters&nbsp; ( BOQ)</td>\r\n\t\t\t<td style=\"width:248px\">We understand that other installation accessories for single phase &amp; three phase meters like GI wire, clamps, conduits &amp; etc will be in the JBVNL scope. Please confirm.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Any accessories for successful implementation of the meter will be in bidder scope.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Any accessories for successful implementation of the meter will be in bidder scope.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:141px\">183</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Schedule 2- page -114</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CT&rsquo;s for CT operated consumer &amp; DT meters 2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cable for CT operated meters 3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cable for HT consumer &amp; feeder meters.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">We understand that CT, Cable &amp; any other installation accessories will be in the scope of JBVNL. Kindly confirm.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Any accessories for successful implementation of the meter will be in bidder scope including cable but excluding CTs (CT BOQ to be added along with CT Cable (1.1 KV, 12C, 2.5 mm2, XLPE, Multistrand for CT to Meter Wiring</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Any accessories for successful implementation of the meter will be in bidder scope including cable but excluding CTs (CT BOQ to be added along with CT Cable (1.1 KV, 12C, 2.5 mm2, XLPE, Multistrand for CT to Meter Wiring</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:167px\">) CT specs to be also added</td>\r\n\t\t\t<td style=\"width:193px\">) CT specs to be also added</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">184</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;Page -115</td>\r\n\t\t\t<td style=\"width:249px\">BOQ- HT Meters - HT Three Phase (3 &Oslash;) CT Operated Smart Tri Vector Meter with RF Communication Module.</td>\r\n\t\t\t<td style=\"width:248px\">We hereby recommend HT meter with inbuilt GSM/GPRS modem (as per IS 14697) due to installation of HT consumers and substation meters in&nbsp; large geographical area Please accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Scope HT meter deleted from this RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:73px\">185</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page 116 &amp; 135</td>\r\n\t\t\t<td style=\"width:249px\">HES scalability for 5 lakh consumers on page no. 116 HES scalability for 10 lakh consumers on page no. 135</td>\r\n\t\t\t<td style=\"width:248px\">Both the clauses are contradictory. Please confirm the exact numbers of consumers for scalability.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">186</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -117- 4.2.1</td>\r\n\t\t\t<td style=\"width:249px\">DCU/ Gateway &ndash;3517 nos.</td>\r\n\t\t\t<td style=\"width:248px\">We understand that final quantity will be confirmed after survey to establish the network in better way.&nbsp; if&nbsp; any additional quantity of DCU/GATEWAY is required cost of the same will be given to the supplier</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">No, Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. No additional payment will be done additional DCU.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">No, Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. No additional payment will be done additional DCU.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">187</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Page -136-7</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Integration with existing legacy systems and upcoming DISCOM systems including Metering, Billing and Collection, MDMS, systems.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">We understand that Bidder will integrate HES software with upcoming MDM. Billing and collection is part of MDM. So, same should be deleted from scope of this RFP. Please confirm the format of raw data to be provided.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">188</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -143-1.3.3.4</td>\r\n\t\t\t<td style=\"width:249px\">Scalability and Availability Should be horizontally and vertically scalable to cater millions of devices</td>\r\n\t\t\t<td style=\"width:248px\">Millions of devices is an open ended subject hence same should be removed. The number of scalability should be properly defined. We understand that devices are only energy meters.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">System to be designed for up to 1000000 meters</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">189</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;Page -166-&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Penalty table for SLA | &gt;=99% - No penalty | &gt;= 90% to &lt; 99%* - No payment towards non-reporting consumer Meters. Additionally, penalty at the rate of percentage by which the SLA falls below 99% shall be deducted from the monthly invoice of the vendor. | Below 90 % - No payment shall be made</td>\r\n\t\t\t<td style=\"width:248px\">This penalty clause is very stringent. Looking to the practical situations in filed we here by suggest following changes to meet the SLA . | &gt;=90%- No penalty | &gt;= 80% to &lt; 90%* - No payment towards non-reporting consumer Meters. Additionally, penalty at the rate of percentage by which the SLA falls below 90% shall be deducted from the monthly invoice of the vendor. | Below 80% - No payment shall be made</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">190</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -167-iv</td>\r\n\t\t\t<td style=\"width:249px\">If the defective or damaged materials are not replaced within 15 days from the date of receipt of the intimation from the JBVNL of such defects or damages, then a penalty of 0.5% per week or part thereof, subject to maximum 10% of O&amp;M cost of that material in addition to SLA shall be applicable.</td>\r\n\t\t\t<td style=\"width:248px\">Looking to the field conditions replacement period should be 30 Days. The penalty should be imposed on delayed portion at ex-works value of monthly O&amp;M cost. Please confirm</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">191</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -174-30-a</td>\r\n\t\t\t<td style=\"width:249px\">Meter shall be programmed for &ldquo;Lag only configuration&rdquo; i.e. lead to be treated as unity PF for KVAh calculation</td>\r\n\t\t\t<td style=\"width:248px\">Kvarh measurement is not applicable for 1Ph meter. Kindly remove the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">192</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -176-2</td>\r\n\t\t\t<td style=\"width:249px\">Terminal Block-The molded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate conforming to IS:13779- 1999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals.</td>\r\n\t\t\t<td style=\"width:248px\">Subject clause should be amended as &ldquo;The moulded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate/equivalent or superior material conforming to IS:13779- 1999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">193</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -177- cl 3(f)&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter.</td>\r\n\t\t\t<td style=\"width:248px\">The subject clause should be amended as: The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter or detachable type.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">194</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -185 11( a)&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Meter shall be capable of doing TOD metering for KWH, KVAH and MD in KW and KVA in 3 tariff registers programmable for 3 seasons and 6 time zones</td>\r\n\t\t\t<td style=\"width:248px\">Seasons, MD KW &amp; KVA in TOD data is not applicable as per IS16444. Kindly remove the same</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specification to be complied and in case of Net Meters Export KWh, KVAh, KW and KVA for Export register cumulative and TOD should also be included.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">As per IS 16444 to be followed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">195</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -188 ( 9)</td>\r\n\t\t\t<td style=\"width:249px\">Meter shall log all events when AC/DC/ Pulsating voltage is injected in neutral circuit especially when it can disturb the recording of energy. Manufacturer should specify the method of testing of Neutral disturbance</td>\r\n\t\t\t<td style=\"width:248px\">Meter will be in disconnected condition to prevent this tamper. Please accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed, however loggings should also be there.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed, however loggings should also be there.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">196</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -189 (10) -f</td>\r\n\t\t\t<td style=\"width:249px\">Manufacturer should explain method of MD computation during magnetic interference.</td>\r\n\t\t\t<td style=\"width:248px\">Meter will record MD as per Imax, Vref, Unity PF in magnet tamper condition.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">197</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -189 (15)</td>\r\n\t\t\t<td style=\"width:249px\">I/C &amp; O/G Interchanged: Meter should record forward energy within limits of accuracy class 1.0.</td>\r\n\t\t\t<td style=\"width:248px\">Meter will disconnect the load switch to avoid this tamper. Please accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specification to be complied; however proper metering to be done for import Export meters when deployed in Solar generation connections.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Specification to be complied; however proper metering to be done for import Export meters when deployed in Solar generation connections.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">198</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;Page -190( 22)&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Snapshot --Phase wise instantaneous current ,voltage&nbsp; &amp; PF</td>\r\n\t\t\t<td style=\"width:248px\">Being 1Ph meter specification please remove the phase wise instantaneous current, voltage &amp; PF. These parameters should be as per IS 16444 &ndash;D1 Category.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">199</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page 201-6</td>\r\n\t\t\t<td style=\"width:249px\">Battery - Varta, Tedirun, Sanyo or National, Duracell, Maxwell- Hitachi, Panasonic and Mitsubishi, Renata, Elegance</td>\r\n\t\t\t<td style=\"width:248px\">Tekcell &amp; Eternacell are also branded batteries. These batteries are also being adopted by other discoms . So Please add the same in NIT.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">200</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page- 204- 1.6.2</td>\r\n\t\t\t<td style=\"width:249px\">Degree of protection-IP 55 ( Box)</td>\r\n\t\t\t<td style=\"width:248px\">Being polycarbonate box it should be IP54 . Please amend the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">201</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">1Ph &ndash; meter box- page -205-f</td>\r\n\t\t\t<td style=\"width:249px\">Suitable circular holes shall be provided at the bottom of the meter box for inlet and outlet cables with suitable gland size to accommodate three and half core armoured aluminium cable(s) up to 35 Sq.mm</td>\r\n\t\t\t<td style=\"width:248px\">As per prevailing practice in utility , single phase service cable is of 2CX 4 sqmm&nbsp; unarmoured aluminium cable is used , hence we request to adopt the same practices .</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">202</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -219 -4 -3Ph meter</td>\r\n\t\t\t<td style=\"width:249px\">Current rating Base Current (Ib) &ndash; 20 Amps. Maximum Current (Imax) &ndash; 100 Amps. Meter shall meet accuracy requirements, even if 120% of Imax carried continuously.</td>\r\n\t\t\t<td style=\"width:248px\">We here by suggest that rating should be 10-60A as per Standard practice in utilities.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">203</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -224-2-b</td>\r\n\t\t\t<td style=\"width:249px\">The moulded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate conforming to IS:137791999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals.</td>\r\n\t\t\t<td style=\"width:248px\">Subject clause should be amended as &ldquo;The molded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate/equivalent or superior material conforming to IS:13779- 1999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">204</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-225-3-e</td>\r\n\t\t\t<td style=\"width:249px\">The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter</td>\r\n\t\t\t<td style=\"width:248px\">The subject clause should be amended as: The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter or detachable type.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">205</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-231-14</td>\r\n\t\t\t<td style=\"width:249px\">MD Registration- Block / 15 min sliding window with 30 min integration period as per requirement.</td>\r\n\t\t\t<td style=\"width:248px\">For sliding MD time should be 10 min sliding window with 30 min integration period. Please amend the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">206</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-231-15</td>\r\n\t\t\t<td style=\"width:249px\">Following parameters shall be measured and recorded at the end of each 30 min interval for last 60 days. Block energy KVARH- (Lag), Block Energy KVARH- (lead), Neutral Current.</td>\r\n\t\t\t<td style=\"width:248px\">Block energy KVARH- (Lag), Block Energy KVARH- (lead), Neutral Current, these parameters are not applicable as per IS16444 category D2. Please delete the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">To be provided as per IS 16444</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">207</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-233-19</td>\r\n\t\t\t<td style=\"width:249px\">Meter shall be capable of doing TOD metering for KWH, KVAH and MD in KW and KVA in three tariff registers programmable for 3 seasons and six time zones</td>\r\n\t\t\t<td style=\"width:248px\">Seasons, MD KW &amp; KVA in TOD data is not applicable as per IS16444. Kindly remove the same</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specification to be complied and in case of Net Meters Export KWh, KVAh, KW and KVA for Export register cumulative and TOD should also be included.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">To be provided as per IS 16444</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">208</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-234-22</td>\r\n\t\t\t<td style=\"width:249px\">Push&nbsp; -Meter is able to report HES, the status change of any of the identified events like, &bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Earth Loading</td>\r\n\t\t\t<td style=\"width:248px\">The push events should be as per IS16444.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specifications to be complied.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">To be provided as per IS 16444</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">209</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-237-8.9</td>\r\n\t\t\t<td style=\"width:249px\">Manufacturer should explain method of MD computation during magnetic interference.</td>\r\n\t\t\t<td style=\"width:248px\">Meter will record MD as per Imax, Vref, and Unity PF in magnet tamper condition.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">210</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-248-6</td>\r\n\t\t\t<td style=\"width:249px\">Battery- Varta, Tedirun, Sanyo or National, Durocell, Maxwell Hitachi, Panasonic and Mitsubishi, Renata, Elegance</td>\r\n\t\t\t<td style=\"width:248px\">Tekcell &amp; Eternacell are also branded batteries. These batteries are also being adopted by other discoms also. So Please add the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:111px\">211</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">&nbsp;Page-248-7</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">RTC and Micro Controller- Phillips, Dallas Atmel, Motorola, Microchip. NEC or Oki. Renesas, Intersil, Analog Devices, Crysal: FRONTER ELECTRONICS, Roson</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Texas instrument is also a branded part &amp; same is being adopted by other discoms also. So Please add the same in NIT.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:167px\">RTC and Micro Controller- Phillips, Dallas Atmel, Motorola, Microchip. NEC or Oki. Renesas, Intersil, Analog Devices, Crysal: FRONTER ELECTRONICS, Roson,Texas instrument&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">RTC and Micro Controller- Phillips, Dallas Atmel, Motorola, Microchip. NEC or Oki. Renesas, Intersil, Analog Devices, Crysal: FRONTER ELECTRONICS, Roson,Texas instrument&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">212</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -252-36.1.2</td>\r\n\t\t\t<td style=\"width:249px\">Degree of protection-IP 55.</td>\r\n\t\t\t<td style=\"width:248px\">Being polycarbonate box it should be IP54. Please amend the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">213</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -254</td>\r\n\t\t\t<td style=\"width:249px\">The box shall be designed in such a way that there should be the following clearances between the meter and the Meter box: front of the meter and the meter box front-10mm</td>\r\n\t\t\t<td style=\"width:248px\">We here by suggest that this dimension should be manufacturer specific complying with other requirements. Please amend the clause accordingly.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Clearance to be provided as per specification; overall dimension can be as per Bidder&#39;s meter size</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">214</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-271-13</td>\r\n\t\t\t<td style=\"width:249px\">Mechanical requirement-Meter shall comply clause 12.3 of IS 13779.</td>\r\n\t\t\t<td style=\"width:248px\">It should be as per IS14697 or IS16444.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px\">215</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-271-15</td>\r\n\t\t\t<td style=\"width:249px\">Insulation and Impulse test : Meter shall comply with IS 13779</td>\r\n\t\t\t<td style=\"width:248px\">It should be as per IS14697 or IS16444.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">216</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -274- 2-b</td>\r\n\t\t\t<td style=\"width:249px\">The moulded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate conforming to IS:13779- 1999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals</td>\r\n\t\t\t<td style=\"width:248px\">Subject clause should be amending as &ldquo;The molded terminal block shall be made from best quality phenol formaldehyde/Poly carbonate/equivalent or superior material conforming to IS: 14697- 1999 (latest amended) having adequate insulating properties and mechanical strength with brass inserts for connecting terminals.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">217</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page-275-3</td>\r\n\t\t\t<td style=\"width:249px\">The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter</td>\r\n\t\t\t<td style=\"width:248px\">The subject clause should be amended as: The terminal cover of the meter should be hinged either at the top or left side so that it opens from bottom to top or hinged at the left side so that it opens from right to left of the meter or detachable type.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">218</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page- 281-15</td>\r\n\t\t\t<td style=\"width:249px\">Following parameters shall be measured and recorded at the end of each 30 min interval for last 60 days. Neutral Current Block energy KVARH- (Lag)&nbsp;&nbsp; Block Energy, KVARH- (lead)</td>\r\n\t\t\t<td style=\"width:248px\">kvarh lag , kvarh lead, Neutral current are not applicable as per IS16444 D3 category. Please delete the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">To be provided as per IS 16444</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">219</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page- 283-19</td>\r\n\t\t\t<td style=\"width:249px\">Meter shall be capable of doing TOD metering for KWH, KVAH and MD in KW and KVA in three tariff registers programmable for 3 seasons and six time zones.</td>\r\n\t\t\t<td style=\"width:248px\">Seasons, MD KW &amp; KVA in TOD data is not applicable as per IS16444.&nbsp; Please delete the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Specification to be complied and in case of Net Meters Export KWh, KVAh, KW and KVA for Export register cumulative and TOD should also be included.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">To be provided as per IS 16444</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">220</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -287-9</td>\r\n\t\t\t<td style=\"width:249px\">Manufacturer should explain method of MD Computation during magnetic interference.</td>\r\n\t\t\t<td style=\"width:248px\">Meter will record MD as per Imax, Vref, Unity PF in magnet tamper condition. Please confirm the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">221</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -292-50</td>\r\n\t\t\t<td style=\"width:249px\">Type Test ( CT operated meters ) The bidders shall be required to furnish valid type test reports in respect of 3 phase static energy meter with optical port as per requirement of IS16444 (Part-2) - 2017 from CPRI or ERDA only. The type test certificate should not be older than three years as on the date of opening of techno-commercial bid.</td>\r\n\t\t\t<td style=\"width:248px\">Meter will be complied as per IS16444 and necessary type test and BIS will be submitted&nbsp;&nbsp; before commencement of supply. Please accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">222</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -298-6</td>\r\n\t\t\t<td style=\"width:249px\">Battery - Varta, Tedirun, Sanyo or National, Durocell, Maxwell- Hitachi, Panasonic and Mitsubishi, Renata, Elegance.</td>\r\n\t\t\t<td style=\"width:248px\">Tekcell &amp; Eternacell are also branded batteries. These batteries are also being adopted by other discoms also. So, please add the same in NIT.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">223</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -298-7</td>\r\n\t\t\t<td style=\"width:249px\">RTC&nbsp;&nbsp; and Micro Controller- Phillips, Dallas Atmel, Motorola, Microchip. NEC or Oki. Renesas, Intersil, Analog Devices, Crysal, FRONTER ELECTRONICS, Roson Electronics.</td>\r\n\t\t\t<td style=\"width:248px\">Texas instrument is also a branded part &amp; same is being adopted by other discoms also. So Please add.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:186px\">224</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">&nbsp;&nbsp;Page- 299</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">In BOQ on page no .115 polycarbonate box is mentioned, while on page no 299 SMC is required.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Please remove the polycarbonate word from BOQ description.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">225</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -300-19.2</td>\r\n\t\t\t<td style=\"width:249px\">The concealed brass hinges shall be fitted with the meter Box body base and the cover rigidly in such a way that the same are neither visible nor accessible from outside, thereby making the Meter Box pilfer proof</td>\r\n\t\t\t<td style=\"width:248px\">The subject clause should be amended s:The concealed brass/ SS hinges shall be fitted with the meter Box body base and the cover rigidly in such a way that the same are neither visible nor accessible from outside, thereby making the Meter Box pilfer proof</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">226</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">&nbsp;Meter Specs&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">HT consumer meter, Feeder meter, &amp; Box</td>\r\n\t\t\t<td style=\"width:248px\">Specifications (Annexure 4) are not available in NIT.&nbsp;&nbsp; Please also confirm specification of boxes.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer annexure-4</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">HT meter scope deleted from this RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">227</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Sec-VIII- page no -635</td>\r\n\t\t\t<td style=\"width:249px\">The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: Ten percent (10%) of the Contract Price</td>\r\n\t\t\t<td style=\"width:248px\">Please amend the clause as &ldquo;Performance Security 5 % of ex &ndash;works value of Contract Price&rdquo; to avoid additional financial burden on bid costing.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">228</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -636- 13.3.3</td>\r\n\t\t\t<td style=\"width:249px\">The Performance Security shall be reduced to 10% of the total O&amp;M cost on the date of the Operational Acceptance of each phase. In case the successful bidder did not use sub- contractor&rsquo;s credentials for meeting the qualifying requirements of the bid, a rebate of two percent (2%) shall be applicable on the Performance Security.</td>\r\n\t\t\t<td style=\"width:248px\">We would like to suggest that :The Performance Security shall be reduced to 5% ex works&nbsp; of the total O&amp;M cost on the date of the Operational Acceptance of each phase.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions. However clause related to rebate is deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">229</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -637-PCC-25&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Operational acceptance - Total Meters supply shall be in lots of 20,000 meters (with all required accessories for complete installation) in each lot. Next lot shall be supplied only after at least 10,000 meters from the each already supplied lot are installed and commissioned.</td>\r\n\t\t\t<td style=\"width:248px\">We here by suggest to amend lot size from 20,000 to 10,000 for smooth execution. It will help to speed up supply as well as installation process.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">230</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Page -638</td>\r\n\t\t\t<td style=\"width:249px\">Operational Acceptance of complete project- Bidder has discharged all their duties &amp; obligations to the satisfaction of the utility as envisaged under this RFP in compliance with Govt. Guidelines.</td>\r\n\t\t\t<td style=\"width:248px\">This is open ended clause hence please confirm measurable parameters for satisfaction of utility.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">231</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Genus Power&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">PCC -26.2- P&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; page -639</td>\r\n\t\t\t<td style=\"width:249px\">Applicable rate for liquidated damages: 0.5%) per week, and the maximum shall not exceed ten percent (10%) of the Contract price</td>\r\n\t\t\t<td style=\"width:248px\">Please amend the clause as &ldquo;liquidated damages 0.5% per week and the maximum shall not exceed 5 % of ex &ndash;works value of delayed portion&rdquo;.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">232</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">JBVNL intends to implement remote meter reading across all categories of urban consumers in Ranchi Town (project area) to achieve error free data, network problem identification, load profile monitoring, Energy Audit and eventually carry out Demand Side Management (DSM) through deployment of an AMI system with its auxiliary applications.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&quot;Network Problem Identification&quot;, should not be part of achievement. Rather the network should be so robust that there should not be any network issues. However, if in case any such network issue arises even then it should ensure timely error free data at HES through &quot;Self Heal&quot;, except any &quot;Force Majeure&quot;.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">134</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">1.3 Advanced metering infrastructure (AMI) system</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:126px\">233</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The meter shall calculate both TOU and CPP rate-based consumption.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&quot;CPP (Critical Peak Pricing)&quot; is not defined in any of the legal documents in the country i.e. neither in the CEA AMI Functional requirement nor in the BIS Standard 16444 part-I. Also this has not been defined by the JERC in the tariff order. Hence, we would like to understand the detailing of it, such as peak rate price coming from and action to be taken, etc.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">CPP is not required</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">CPP is not required</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">137</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">1.3.1 Smart Meters</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:206px\">234</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Smart meters must have a supply Disconnect/Reconnect switch/contactor for part/full load (Except Feeder and DT Meters).</td>\r\n\t\t\t<td style=\"width:248px\">1) The meters shall be supplied w.r.t IS16444 Part-I and Part-II. Under IS 16444 Part-II NO Disconnection Switch is defined. Hence, for any HT / LTCT consumers meters will not have Disconnect switch. Only the meters which are being supplied under IS 16444 Part-I (Direct connected) will have disconnect switch.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:42px; width:92px\">137</td>\r\n\t\t\t<td style=\"width:248px\">2) The feature to use the switch is defined under CEA functional specification and also in the BIS IS16444 part-I. The same shall be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">1.3.1 Smart Meters (viii) Load Disconnect/ Reconnect switch requirement (a)</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:171px\">235</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The meter must provide clear local visual indication of the status (open/closed) of the Supply contactor, consumption, last bill details.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&quot;Bill details&quot; means monthly consumption or any other parameters. As the parameters are defined in IS15959 Part-II. Any other details need to be explained &amp; discussed.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">138</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">1.3.1 Smart Meters (viii) Load Disconnect/ Reconnect switch requirement (e)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:242px\">236</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system 138</td>\r\n\t\t\t<td style=\"width:249px\">The communication infrastructure should be based on IPV6 compliant RF mesh network.</td>\r\n\t\t\t<td style=\"width:248px\">Process / Procedure to test IPV6 network in NAN, needs to be defined. Availability of IPV6 in public network also needs to be ensured.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:77px; width:92px\">1.3.2 Communication Infrastructure</td>\r\n\t\t\t<td style=\"width:249px\">Communication canopy routers/repeaters/access points/gateway/DCU must have RF Mesh Communication for NAN and 4G (with fall back on 3G/2G) &amp; Ethernet port (MPLS/Optic Fiber) for WAN connectivity.</td>\r\n\t\t\t<td style=\"width:248px\">Fall back should be for the last mile connectivity i.e. RF Mesh technology, if in case it doesn&#39;t work. As in case of backhaul it is already mentioned that either 4G or any other Ethernet connectivity such as MPLS / Optic fibre should be there.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The GPRS communication network shall be capable of servicing 3G/ 4G/ NB LTE or NB IoT with fallback on GPRS or any other band technology compliant with IPv6 operating in the frequency bands allocated by Government of India. The GPRS/MPLS network between DCU and HES shall be a VPN-based secure tunnel.</td>\r\n\t\t\t<td style=\"width:248px\">If in case the communication infrastructure has to support multiple comms such as GPRS / 3G / 4G / NBLTE / NBIoT, then in that case all 350000 devices (Smart Meters) should have provision of these comms. Which means adding more power consumption of meter as well as increasing the cost. Please clarify.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:208px\">237</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Secure Metering</td>\r\n\t\t\t<td style=\"width:92px\">B. Functional, Architectural and performance requirements of AMI system 143</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Should be horizontally and vertically scalable to cater millions of devices</td>\r\n\t\t\t<td style=\"width:248px\">The communication infrastructure should be able to support multiple applications such as AMI, Distribution Automation (DA), Streetlight, Gas Meter, Water Meter and various other Smart Grid application. As the same will be very much useful for the Discom and will be a revenue stream as well.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Final Quantity to be considered as 3,51,710&nbsp; for meters as on date but the system should support scalability up to 10,00,000 Meters to accommodate.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px; width:92px\">1.3.3.4. ADDITIONAL REQUIREMENTS FOR RF MESH COMMUNICATION ON 865-867 MHZ (1)</td>\r\n\t\t\t<td style=\"width:248px\">The communication infrastructure should support multiple protocols through the network devices up to HES.The HES should be able to support multiple comms along with multiple protocols.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:201px\">238</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Section II - Bid Data Sheet, ITB, 26.2, 46</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall submit the following documents in hardcopy before the Bid Submission date &amp; time and also scanned copy of these along with other documents shall be uploaded on e-procurement portal.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">1. Whether any Bid Document fee is required to be submitted in the form of DD?</td>\r\n\t\t\t<td style=\"width:183px\">We understand there is no Bid Document fee for this Tender.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">1. Bid Document fee in the form of DD</td>\r\n\t\t\t<td style=\"width:183px\">Other than original Bid Security in the form of Bank Guarantee and Power of Attorney&nbsp; rest of all documents has to be uploaded on JBVNL procurement portal&nbsp; as per the ITB clause no. 12.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">2. EMD in the form of Bank Guarantee as per format provided in Bid Forms.</td>\r\n\t\t\t<td style=\"width:183px\">Request you to kindly confirm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">3. Power of Attorney</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">239</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-1, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications of Single Phase whole Current Smart Meters and with Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Current Rating 5-30 Amp.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We request you to kindly amend 1Ph Whole Current Smart Meter Rating as 10-60 Amp.</td>\r\n\t\t\t<td style=\"width:167px\">1 Ph Smart meter current rating as 10-60 Amp</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">1Ph Smart meter current rating as 5-30A</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">240</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-2, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications of Three Phase whole Current Smart Meter of Accuracy Class 1.0 with Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Current Rating 20-100 Amp.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We request 3Ph Whole Current Smart Meter Rating as 10-60 Amp.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">3Ph Whole current smart meter rating as 10-60A</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:186px\">241</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-3, 77</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Technical specifications for CT operated AC Three Phase Four Wire Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Meter Box</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Separate Technical specifications for Consumer Meter and DT Meter is missing&nbsp; in Tender document</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please arrange to provide detailed Separate Technical Specifications for Consumer metering and DT Metering for the BOQ Line Item No. 2.1.1.3 &amp; 2.1.1.4</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Pls refer Annexure-3 &amp; 4</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">242</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-4, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications for CTPT operated AC Three Phase Four Wire HT Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Box</td>\r\n\t\t\t<td style=\"width:248px\">Technical specifications of HT CTPT Operated Meter is missing in Tender document</td>\r\n\t\t\t<td style=\"width:183px\">Please arrange to provide detailed Separate Technical Specifications of CTPT operated AC Three Phase Four Wire HT Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Box for Consumer and Feeder Metering for BOQ Line Item No. 2.1.1.5 &amp; 2.1.1.6</td>\r\n\t\t\t<td style=\"width:167px\">Refer Annexure-4 for Specs</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">HTCT meter scope deleted from this RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:81px\">243</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Appendix to Financial Part, Section-I Instructions to the Bidder, 115</td>\r\n\t\t\t<td style=\"width:249px\">Service Cable</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">Detailed specifications and JBVNL&rsquo;s approved Vendors list is missing</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">Please arrange to provide detailed specifications and JBVNL&rsquo;s approved vendor list of LT XLPE cables and for other line items too.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Pls refer Annexure -6.1. &amp; 6.2</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Pls refer Annexure -6.1. &amp; 6.2</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">LT XLPE Cable 2 Core 10mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">LT XLPE Cable 3.5 Core 25mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">LT XLPE Cable 3.5 Core 50mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">244</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Background and Information Materials, , 322</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Project Area Latitude &amp; Longitude of DT</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Detailed and accurate list of Single Phase &amp; Three Phase consumers are missing</td>\r\n\t\t\t<td style=\"width:183px\">Please arrange to provide the detailed accurate list of Single Phase, Three Phase consumers along with HT Consumers / Feeder Meters.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Details are already given in RFP</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Details are already given in RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:183px\">However, DT Meter GPS Coordinates are provided in the Tender Documents.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">245</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section III &ndash; Evaluation and Qualification Criteria, Table 3, Sr. No. 2.1, 58, ELIGIBILITY AND QUALIFICATION CEITERIA FOR JV / SINGLE BIDDER&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;Suspension based on execution of a Bid Securing Declaration or Proposal Securing Declaration pursuant to ITB 4.7 and ITB 20.9</td>\r\n\t\t\t<td style=\"width:248px\">The ITB 4.7 and ITB 20.9 are not in use</td>\r\n\t\t\t<td style=\"width:183px\">The ITB clauses nos. 4.7 (Page No. 18 of 720) &amp; 20.9 (Page No. 29 of 720) referred here are not in use as per the Tender document. In that case we request you to kindly clarify is to be mentioned in our compliance letter.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:211px\">246</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Section III &ndash; Evaluation and Qualification Criteria, 4.2 (b), 60, ELIGIBILITY AND QUALIFICATION CEITERIA FOR JV / SINGLE BIDDER&nbsp;</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:249px\">Specific Experience:&nbsp; The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">Whether Bidder can show more than 1 (one) Purchase Order of different Scope of work and different Type / Rating of Meters to meet the above qualification criteria? or it should a single Purchase Order having the above entire scope?&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We also request you to kindly amend the clause as:</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have executed (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:183px\">&lsquo;The Bidder must have successfully manufactured / supplied, at least 1,80,000 AMR or AMI Meters in Power Distribution Utility (s) in the last 7 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:183px\">The bidder must have installed and commissioned at least 36,000 (i.e. 20% of supply quantity) Meters as part of an AMI/AMR system.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:183px\">The bidder must have Supplied / Installed MDAS or HES application with 90% of Meter data availability&rsquo;.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">247</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Single Phase Smart Energy Meter Section VII &ndash; Scope of work 4.0 Sr. 1 171</td>\r\n\t\t\t<td style=\"width:249px\">Supply / Installation system Data:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">What is IP requirement</td>\r\n\t\t\t<td style=\"width:183px\">Since meters are required duly fitted in meter cupboard hence meter shall meet the IP51 requirement duly mounted in meter cup board. We understand this is in line with your requirement.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">IP55 for box and IP51 for meter</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">IP54 for box and IP51 for meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Installation &ndash; Outdoor.</td>\r\n\t\t\t<td style=\"width:183px\">In previous tenders at JBVNL, we have been supplying Meters with IP51 &amp; Meter Box with IP54.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">248</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Single Phase Smart Energy Meter Section VII &ndash; Scope of work 5.0, Sr. No. 18 (b) 173</td>\r\n\t\t\t<td style=\"width:249px\">Minimum Insulation resistance:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">This test is not applicable for whole current meter since voltage &amp; current terminals are solidly connected from inside.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">We request you to kindly delete the clause</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter</td>\r\n\t\t\t<td style=\"width:249px\">Between each current (or voltage circuit) &amp; each and every other circuit: 50 M Ohm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">249</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work 5.0, Sr. No. 21 173</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Immunity to phase and earth fault: Meter shall comply requirement of clause no. 9.6 of IS 13779</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">This test is not applicable for Single Phase Meters.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">We request you kindly delete the clause</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">250</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work 6.0, Sr. No. 10 178</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">&nbsp;Battery: Lithium ion battery with guaranteed shelf life of 10 years. Lithium thiol Chloride battery will be preferred.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Kindly note that Lithium ion batteries are rechargeable batteries whereas Lithium Thyioal chloride batteries are primary batteries&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Requested to kindly clarify both types of batteries are acceptable to you or only primary batteries are required by you</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:181px\">251</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Load Control Switch:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Specific make Load Control Switch is asked i.e. make of the load switch should be of Gruner / KG Technologies(German) make only</td>\r\n\t\t\t<td style=\"width:183px\">Other equivalent makes compliance to IS 15884 may kindly be accepted alternatively.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed, however make should be approved prior to supply of meters.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed, however make should be approved prior to supply of meters.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The make of the load switch should be of Gruner / KG Technologies (German) make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,6.0, Sr. No. 13 (e),178</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Kind amend the requirement as asked i.e. make of the load switch should be of Gruner / KG Technologies (German) and equivalent make.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:181px\">252</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Load Data survey:</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">Seems there is&nbsp; typographical error in mentioning serial nos.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Numbering after &quot;serial no.- vi&quot; seems typographical error since&nbsp; point vii to xi are notes/instructions not parameters.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,7 (vii) to (ix),183</td>\r\n\t\t\t<td style=\"width:249px\">vi. Voltage- average values during the block period time.</td>\r\n\t\t\t<td style=\"width:183px\">Hence request you to correct the sequence.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vii. Voltage-average values during the block period time.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">viii. Energies are consumption during the block period.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">ix. All parameters are stored at the end of capture period.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:297px\">253</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work A. Tech&nbsp; Specs. of Smart Energy Meter,8.0, Sr. No.22,190</td>\r\n\t\t\t<td style=\"width:249px\">Scope of Work: Parameter Snapshot: Captured parameters mentioned above are to be captured when even occurrence and restoration is logged as per table A11 of IS 15959 (Part 2)</td>\r\n\t\t\t<td style=\"width:248px\">Following are 3 Phase Meter parameters:</td>\r\n\t\t\t<td style=\"width:183px\">As per IS 15959 (Part-2) Following parameters are required to log with snapshot.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">For Single Phase meters Phase voltage and Phase and Neutral current to be captured. For 3 Phase Whole current meters said parameters to be captured.&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">For Single Phase meters Phase voltage and Phase and Neutral current to be captured. For 3 Phase Whole current meters said parameters to be captured.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">i.&nbsp;&nbsp; Date and time of event</td>\r\n\t\t\t<td style=\"width:248px\">i.&nbsp;&nbsp; Current R Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:183px\">1. Current</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">ii.&nbsp; Even code</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">2. Voltage</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">iii. Current R Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">ii.&nbsp; Current y Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:183px\">3. PF</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">iv. Current y Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">4. kwh</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">v.&nbsp; Current B Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:248px\">iii. Current B Phase &ndash; instantaneous current.</td>\r\n\t\t\t<td style=\"width:183px\">5.Cum Tamper Count</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vi. Voltage R Phase</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">The Parameters mentioned from serial no (iv) to xi are for Three Phase Meters.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vii.&nbsp;Voltage Y Phase</td>\r\n\t\t\t<td style=\"width:248px\">iv. Voltage R Phase</td>\r\n\t\t\t<td style=\"width:183px\">Please amend parameters&nbsp; as per Single Phase Meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">viii. Voltage B Phase</td>\r\n\t\t\t<td style=\"width:248px\">v.&nbsp; Voltage Y Phase</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:23px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Voltage B Phase</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:136px\">254</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Type Test:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Type Test Reports of&nbsp;&nbsp; 1Ph. 5-30 Amp. Meter&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you to allow to submit Type Test Reports before the commencement of supply or alternatively allow us to submit the available Meter rating Type Test Reports along with the Bid Document.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,12.0 (1.3),195</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">255</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make or origin confirm to IS-2705</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We understand Shunt of any other equivalent make is also acceptable.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,17.0 (1),200</td>\r\n\t\t\t<td style=\"width:249px\">Make &amp; Origin: Any make or origin confirming to IS-2705 and other make i.e. Redbourne Engg / Isabelle.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">256</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make of Memory chips.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. R-ohm may kindly be included since it is well reputed make &amp; also included in electronic component makes mentioned at serial no. 5.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,17.0 (3),200</td>\r\n\t\t\t<td style=\"width:249px\">Memory chips: Atmel, National Semiconductors, Microchip, Texas Instruments, Phillips, ST Hitachi or Oki, Teridian, Renesas</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">257</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Battery&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. EVE may kindly be included.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,17.0 (6),201</td>\r\n\t\t\t<td style=\"width:249px\">Battery: Lithium with minimum guaranteed life of 15 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">258</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Optical Port</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Kindly include Whuhan make since this is well reputed make.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,17.0 (10),201</td>\r\n\t\t\t<td style=\"width:249px\">Optical Port.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:111px\">259</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Power loss in each current circuit at basic current in VA &amp; watt.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Power loss as per IS 16444</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please correct GTP point in line with IS Standards i.e., As per IS 16444 (Part1) power loss requirement in current circuit is VA only.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,GTP Sr. No. 21,208</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:261px\">260</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work</td>\r\n\t\t\t<td style=\"width:249px\">Load Survey Parameters for last 60 days.</td>\r\n\t\t\t<td style=\"width:248px\">Please note following parameters are not defined in IS 15959 (Part-2) for load&nbsp; survey</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">We request you to kind amend the GTP serial no. 27 in line with IS 15959 Standards.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">specification to be complied. For parameters which are not defined in IS OBIS codes for same will be provided during detailed engineering stage.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">As per IS 15959 to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Please note following parameters are not defined in IS 15959 (Part-2) for load&nbsp; survey:-</td>\r\n\t\t\t<td style=\"width:248px\">e. KW MD</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">A. Tech&nbsp; Specs. of Smart Energy Meter,GTP Sr. No. 27,260</td>\r\n\t\t\t<td style=\"width:249px\">a. Real Time Clock &ndash; Date &amp; Time</td>\r\n\t\t\t<td style=\"width:248px\">f. System PF</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">b. Voltage</td>\r\n\t\t\t<td style=\"width:248px\">g. Net Kwh</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">c. Current</td>\r\n\t\t\t<td style=\"width:248px\">h. Net Demand</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">d. Energy &ndash; KWH, KVAH (I&amp;E)</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">e. KW MD</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">f. System PF</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">g. Net Kwh</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">h. Net Demand</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:151px\">261</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">General Technical Requirements:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">This requirement is not applicable for whole current Meter.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you to kindly delete the clause</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Minimum Insulation Resistance. Between each current (or voltage circuit) &amp; each and every other circuit: 50 M ohm</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,23.0 (16),220</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">262</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Constructional Requirement: Battery - Lithium ion battery with guaranteed shelf life of 10 years and capacity life of 15 years. Lithium thiol Chloride battery will be preferred. In case battery removal or total discharge, it should not affect the working &amp; memory of the meter. RTC shall have separate battery backup</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Kindly note that Lithium ion batteries are rechargeable batteries whereas Lithium Thyioal chloride batteries are primary batteries&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Requested to kindly clarify both types of batteries are acceptable to you or only primary batteries are required by you</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,24.0 (10),227</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:126px\">263</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Constructional Requirement: The make of the load switch should be Gruner / KG Technologies (German) only and same shall be confirmed by the bidder during tendering.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Specific make Load Control Switch is asked i.e. make of the load switch should be of Gruner / KG Technologies (German) make only</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes compliance to IS 15884 may kindly be accepted alternatively.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed, However make should be approved prior to supply of meters.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed, However make should be approved prior to supply of meters.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,24</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">(13) (e),227</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">264</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Functional Requirement vide which it is mentioned that:&nbsp; MD Registration - Block / 15 min sliding window with 30 min integration period as per requirement.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">We propose 30 minutes block with 10 minutes sub-interval as per IS 15959 (Part2). Kindly accept &amp; amend the same.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,25.0 (14),231</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"8\" style=\"height:241px\">265</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Periodic Push: Meter shall be able to push following instantaneous parameters to HES at predefined intervals.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:248px\">More than 10 Parameters are asked</td>\r\n\t\t\t<td style=\"width:183px\">As per IS 15959 (Part-2) only 10 parameters are required in Push parameter list.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:167px\">Specification to be complied.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:193px\">Specification to be complied.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">i.&nbsp;&nbsp;&nbsp; Device ID</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,25.0 (21) (a),233</td>\r\n\t\t\t<td style=\"width:249px\">ii.&nbsp; Push setup ID</td>\r\n\t\t\t<td style=\"width:183px\">We request you kindly amend the parameter list with 10 parameters in line with IS 15959 (Part 2).</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">iii. Real Time clock &ndash; Date and time</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">iv. Voltage R Phase</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">v.&nbsp; Voltage Y Phase</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vi. Voltage B Phase</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vii.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &hellip;&hellip;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:166px\">266</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Periodic Push:</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">Neutral current is not defined in Instantaneous parameters list.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">The neutral current is not defined in Instantaneous parameters list. Hence, we request you kindly delete the neutral current.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Specification to be complied.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Specification to be complied.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(x) Current Neutral.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,25</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">(21) (a)</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">(x),233</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">267</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Event Push:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Earth loading tamper is not applicable in three phase meters.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Earth loading tamper is not applicable in three phase meters. We request you kindly delete the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Earth Loading.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,25.0 (22) (a),234</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:166px\">268</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Current Related:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Table No. A5 is not related to 3Phase Meter</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">A5 table is for Single Phase Meter. Please amend the table No. as A19.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Occurrence and restoration of following current related events shall be logged in meter memory as per table A5 of IS 15959 (Part 2)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,26.0 (8.1),236</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:146px\">269</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:249px\">Occurrence and restoration of following Power related events should be logged in meter memory as per table A6 of IS 15959 (Part 2).</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">Table No. A6 is not related to 3Phase Meter</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">A6 table is for single phase meter. Please amend the table no. as A20.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,26</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">(8.2) (a),236</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:166px\">270</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Others:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Table no. A8 is not related to 3 Phase Meters</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">A8 table is for Single Phase Meters. Please correct the table no. as A22.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Occurrence and restoration of following events shall be logged in meter memory as per table A8 of IS 15959 (Part 2).</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,26.0 (8.7) (a),236</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:166px\">271</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Type Test:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Type Test Reports of&nbsp;&nbsp; 3 Phase 4 Wire Whole Current. 20-100 Amp. Meter&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you to allow to submit Type Test Reports before commencement of supply or alternatively allow us to submit the available Meter rating Type Test Reports along with the Bid</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,30,242</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:166px\">272</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make or origin confirm to IS-2705</td>\r\n\t\t\t<td style=\"width:183px\">We understand Shunt of any other equivalent make is also acceptable.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Makes &amp; Origin: Any make or origin confirming to IS-2705 and other make i.e. Redbourne Engg / Isabelle.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,35.0 (1),247</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Request you to kindly confirm.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:126px\">273</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make of Memory chips.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. R-ohm may kindly be included since it is well reputed make &amp; also included in electronic component makes mentioned at serial no. 5.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Make of Memory chips.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,30,242</td>\r\n\t\t\t<td style=\"width:249px\">Memory chips: Atmel, National Semiconductors, Microchip, Texas Instruments, Phillips, ST Hitachi or Oki, Teridian, Renesas</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:151px\">274</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Battery&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. EVE may kindly be included.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Battery: Lithium with minimum guaranteed life of 15 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,35.0 (6),248</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">275</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Optical Port</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Kindly include Whuhan make since this is well reputed make.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Optical Port.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,30.0 (10),248</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">276</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Power loss in each current circuit at basic current in VA &amp; watt.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Power loss as per IS 16444</td>\r\n\t\t\t<td style=\"width:183px\">Please correct GTP point</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">As per IS 16444 to be followed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,38.0 GTP (21),259</td>\r\n\t\t\t<td style=\"width:183px\">As per IS 16444 (Part1) power loss requirement in current circuit is VA only.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:151px\">277</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Earth Load Indication (if condition occurred).</td>\r\n\t\t\t<td style=\"width:248px\">Earth load tamper is not applicable for three phase meters.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Earth load tamper is not applicable for three phase meters. We request you to kindly delete the same from specs.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We request you to kindly delete the same from specs.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,38.0 GTP&nbsp; (23) (i),259</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"9\" style=\"height:261px\">278</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td style=\"width:249px\">Load Survey Parameters for last 60 days.</td>\r\n\t\t\t<td style=\"width:248px\">Following parameters are not defined in IS 15959 (Part-2) for load&nbsp; survey:-</td>\r\n\t\t\t<td style=\"width:183px\">Since all these parameters are derived parameters and all can be derived at BCS end.</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"9\" style=\"width:193px\">Bidder to meet IS 15959</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">a. Real Time clock-Date &amp; Time</td>\r\n\t\t\t<td style=\"width:248px\">e. Demand KW MD</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,38.0 GTP&nbsp; (27),260</td>\r\n\t\t\t<td style=\"width:249px\">b. Voltage</td>\r\n\t\t\t<td style=\"width:248px\">f. System Power Factor - PF</td>\r\n\t\t\t<td style=\"width:183px\">We request you kindly accept these parameters at BCS end and amend GTP point in line with IS 15959 Standards</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">c. Current</td>\r\n\t\t\t<td style=\"width:248px\">g. Net Energy - Kwh</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">d. Energy &ndash; KWH, KVAH (I&amp;E)</td>\r\n\t\t\t<td style=\"width:248px\">h. Net Demand &ndash; KW MD</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">e. Demand KW MD</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">f. System Power Factor - PF</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">g. Net Energy - Kwh</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">h. Net Demand</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:211px\">279</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,39,267</td>\r\n\t\t\t<td style=\"width:249px\">Scope of Supply:</td>\r\n\t\t\t<td style=\"width:248px\">In LT CT Meter specs IS 15959 (Part-2) is mentioned everywhere which is not applicable.</td>\r\n\t\t\t<td style=\"width:183px\">For LT CT Meter IS 15959 (Part-3) is applicable. We request you kindly correct the same in entire LT CT Meter specs.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">In LT CT specs IS 15959 (Part-2) and IS 13779 is mentioned</td>\r\n\t\t\t<td style=\"width:248px\">In LT CT Meter specs IS 13779 is mentioned which is not applicable.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">For LT CT class 0.5s, IS 14697 shall be applicable. Please correct the same in entire LT Meter specs.</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">280</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,40.0 (8),268</td>\r\n\t\t\t<td style=\"width:249px\">Codes &amp; Standards: IS-15959 (Part 2): 2011: Data Exchange for Electricity Meter &ndash; Reading Tariff and Load Control &ndash; Companion Specification</td>\r\n\t\t\t<td style=\"width:248px\">IS-15959 (Part 2) is not applicable for 3Ph. LT CT Operated Smart Meter</td>\r\n\t\t\t<td style=\"width:183px\">For LT CT Operated smart meter IS 15959 (Part-3) shall be applicable hence we request you kind add the same in this standard list</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">281</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,44.0 (11),277</td>\r\n\t\t\t<td style=\"width:249px\">Constructional Requirement: Battery - Lithium ion battery with guaranteed shelf life of 10 years and capacity life of 15 years. Lithium thiol Chloride battery will be preferred. In case battery removal or total discharge, it should not affect the working &amp; memory of the meter. RTC shall have separate battery backup.</td>\r\n\t\t\t<td style=\"width:248px\">Kindly note that Lithium ion batteries are rechargeable batteries whereas Lithium Thyioal chloride batteries are primary batteries&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Requested to kindly clarify both types of batteries are acceptable to you or only primary batteries are required by you</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:196px\">282</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Constructional Requirement :</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">For LT CT IS 16444 (part-2) is applicable instead of Part-1</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you to kind correct the same with Part 2 wherever mentioned in LT CT Operated Meter specs.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">As per clause no 1.2(b) of IS 16444 Part -1. Meter should have provision of communication module with both the variant mentioned in IS 16444 Part-1. This module should be able to connect NAN or WAN (as per the plugged module RF or GSM) for two-way communication.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,44.0 (b),277</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">283</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Functional Requirement: MD Registration - Block / 15 min sliding window with 30 min integration period as per requirement.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We propose 30 minutes block with 10 minutes sub-interval as per IS 15959 (Part2). Kindly accept &amp; amend the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (14),281</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">284</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Functional Requirement: Enable/Disable load limit function.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Disconnection switch is not applicable for LT CT meters. Hence load limit related parameters are not applicable. We requested to you kindly delete&nbsp; the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (18) (vii),283</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"8\" style=\"height:241px\">285</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Functional Requirement vide which it is mentioned that: Meter shall be able to push following instantaneous parameters to HES at predefined intervals. i. Device ID</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:183px\">As per IS 15959 (Part-3) only 10 parameters are required in Push parameter list. We request you kindly amend the parameter list with 10 parameters in line with IS 15959 (Part 3).</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:167px\">Specifications to be complied.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:193px\">Specifications to be complied.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">ii. Push setup ID</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (21) (a),284</td>\r\n\t\t\t<td style=\"width:249px\">iii. Real Time clock- Date and time</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">iv. Voltage R Phase</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">v. Voltage Y Phase</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vi. Voltage B Phase</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">vii. Current R Phase</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">viii. &hellip;&hellip;&hellip;.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">286</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Functional Requirement:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">The Neutral Current is not defined in Instantaneous parameters list.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you kindly delete the Neutral Current.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Current Neutral.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (21) (x),284</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">287</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Functional Requirement:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Earth loading is not applicable for 3 phase meters. We request you please delete the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Earth Loading.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (22) (a),285</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">288</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Functional Requirement: Meter load Disconnected/ meter load connected.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Disconnection switches are not applicable in LT CT operated meter.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We request you to kindly delete/amend the Meter load Disconnected / Meter Load connected as per relevant standard.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,45.0 (a),285</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:126px\">289</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Functional Requirement: Anti-tamper and Fraud Detection Requirement.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">The Table numbers mentioned are not as per 3 Ph.&nbsp; LT CT Operated Meter</td>\r\n\t\t\t<td style=\"width:183px\">Please note the Table number are mentioned as per Single Phase Meter category D1.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Table A-19 to be used for 3P WC meter of IS5959 Part-2 and for LTCT meters Table 6 of IS15959 Part-3&nbsp; to be used&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Table A-19 to be used for 3P WC meter of IS5959 Part-2 and for LTCT meters Table 6 of IS15959 Part-2 or 3 to be used as per Thread Thru or conventional type LTCT meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,46,285</td>\r\n\t\t\t<td style=\"width:249px\">a. Occurrence and restoration of following current related events shall be logged in meter memory as per table A5 of IS 15959 (Part2).</td>\r\n\t\t\t<td style=\"width:183px\">We request you kindly correct the table nos. as per IS 15959 (Part-3) category D3</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">290</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make or origin confirm to IS-2705</td>\r\n\t\t\t<td style=\"width:183px\">We understand Shunt of any other equivalent make is also acceptable.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,55.0 (1),297</td>\r\n\t\t\t<td style=\"width:249px\">Make &amp; Origin: Any make or origin confirming to IS-2705 and other make i.e. Redbourne Engg / Isabelle.</td>\r\n\t\t\t<td style=\"width:183px\">Request you to kindly confirm.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">291</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Make of Memory chips.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. R-ohm may kindly be included since it is well reputed make &amp; also included in electronic component makes mentioned at serial no. 5.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,55.0 (3),298</td>\r\n\t\t\t<td style=\"width:249px\">Memory chips: Atmel, National Semiconductors, Microchip, Texas Instruments, Phillips, ST Hitachi or Oki, Teridian, Renesas</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">292</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Battery&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Other equivalent makes e.g. EVE may kindly be included.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Battery: Lithium with minimum guaranteed life of 15 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,55.0 (6),298</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">293</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td style=\"width:249px\">Component Specification:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Makes of Optical Port</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Kindly include Whuhan make since this is well reputed make.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Optical Port.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,55.0 (10),299</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:66px\">294</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,50.0 (12.3),292</td>\r\n\t\t\t<td style=\"width:249px\">Type Test:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Type Test Reports of&nbsp;&nbsp; 3 Phase 4 Wire LT CT Operated Class 0.5s Meter&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">We request you to allow to submit Type Test Reports before commencement of supply.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">The bids of only those bidders shall be considered to be meeting the type test criteria who furnishes complete type test certificates along with the bid as per above provision&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">295</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,57</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Power loss in each current circuit at basic current in VA &amp; watt.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Power loss requirement is VA only for Current Circuit as per IS 16444 (Part 2).</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">IS 16444 to be followed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">19. GTP</td>\r\n\t\t\t<td style=\"width:183px\">We request you to kindly amend the clause accordingly</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;Sr. No. 21 ,303</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">296</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,57</td>\r\n\t\t\t<td style=\"width:249px\">f) Net Energy - Kwahu</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Net Energy kWh, Net Demand - kW MD&nbsp; are not available in Block Load Profile of IS 15959 (Part 3).</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">We request you to kindly delete the same.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bidder to meet IS 15959</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">19. GTP Sr. No. 27,304</td>\r\n\t\t\t<td style=\"width:249px\">g) Net Demand &ndash; KW MD.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">297</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Smart Energy Meter,6.3,176</td>\r\n\t\t\t<td style=\"width:249px\">The ETBC shall be extended by minimum 50mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover for providing numbered double anchor polycarbonate lash wire seal,</td>\r\n\t\t\t<td style=\"width:248px\">50 mm ETBC</td>\r\n\t\t\t<td style=\"width:183px\">As Meter is to be supplied inside the Meter Box therefore terminal block with minimum 30 mm extension below plane surface of the terminal block shall also be sufficient to accommodate the cable. Kindly accept the same</td>\r\n\t\t\t<td style=\"width:167px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">298</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.4),202</td>\r\n\t\t\t<td style=\"width:249px\">supply and unloading at store/site and performance of meter box intended to house one number three phase whole current energy meter complete with all accessories for trouble free and efficient operation.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We think it is a typographical error since it should be single phase whole current smart meter box as this is the technical specification of single phase meter box. Please amend the same and confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">299</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.6.2) Sr. No. (ii), 18 (1.6.3) (b),204</td>\r\n\t\t\t<td style=\"width:249px\">degree of protection&nbsp; to be IP 55, The meter Box shall have roof tapering down to both the sides for easy flow of rainwater and shall have IP 55 degree of protection for affording protection against dust and water.</td>\r\n\t\t\t<td style=\"width:248px\">IP 55</td>\r\n\t\t\t<td style=\"width:183px\">We request you to kindly also accept IP 54 degree of protection for the Meter Box., Please confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">IP 54 is acceptable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">300</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.6.3) (c ), GTP S. No. 6,205</td>\r\n\t\t\t<td style=\"width:249px\">the thickness of the box shall not be less than 3.0 mm on the load bearing side and other sides, door and roof shall not be less than 2.5 mm., BASE: 3mm &amp; COVER: 2.5 mm</td>\r\n\t\t\t<td style=\"width:248px\">Requirements are contradictory</td>\r\n\t\t\t<td style=\"width:183px\">Please amend the GTP in line with clause no. 18-(1.6.3) (C) of meter box technical specification. So that we can provide thickness according to the technical specification., Kindly confirm the acceptability of the same.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">301</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.6.3) (d), GTP S. No. (i),205</td>\r\n\t\t\t<td style=\"width:249px\">minimum clearance between the top of the meter and the meter box cover : 30 mm, construction features of the box it is mention that minimum clearance from Meter surface Top:20 mm</td>\r\n\t\t\t<td style=\"width:248px\">Requirements are contradictory.</td>\r\n\t\t\t<td style=\"width:183px\">Please amend the clause no. 18-(1.6.3) (d) in line with GTP of meter box technical specification. So that we can provide minimum 20mm clearance between top of the meter and meter box. Kindly confirm the acceptability of the same.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">minimum 20mm clearance between top of the meter and meter box.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">302</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.6.3) (f),205</td>\r\n\t\t\t<td style=\"width:249px\">Technical specification of&nbsp; Meter Box, suitable circular holes shall be provided at the bottom of the meter box for inlet &amp; outlet cables with suitable gland size to accommodate three and half core armoured aluminium cable(s) up to 35 Sq.mm made of engineering plastic for the cable securely fixed to the bottom of the cupboard on both sides by chuck-nuts.</td>\r\n\t\t\t<td style=\"width:248px\">Kindly reconfirm your requirement. As the three and half core armoured aluminium cable(s) up to 35 Sq.mm is usually used for three phase meter.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We suggest that for single phase meter, the internal gland diameter of up to 20 -22mm will be more than sufficient to accommodate the outer cable diameter to the said single phase meter&rsquo;s current rating., Please confirm the acceptability of the same.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed for 1 Ph meter</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed for 1 Ph meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">303</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.6.3) (i),205</td>\r\n\t\t\t<td style=\"width:249px\">for fixing of Box on flat wall, 4 Nos. 5mm diameter 40mm long, pan head self- taping screws and washers shall be provided by the supplier with every Box. 4 Nos. plastic fixing plugs of 50mm length suitable for self-tapping screws shall also be provided.</td>\r\n\t\t\t<td style=\"width:248px\">5mm diameter 40mm long,</td>\r\n\t\t\t<td style=\"width:183px\">Please also accept the box fixing screws with 4 to 4.5mm dia and 37mm long, this shall be more than sufficient. Please confirm the acceptability of the same.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">304</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Scope of work, A. Tech&nbsp; Specs. of Single Phase Meter Box,18 (1.7),206</td>\r\n\t\t\t<td style=\"width:249px\">NAME PLATE AND MARKING: the following information shall be clearly and indelibly embossed/engraved (not printed) on the cover and base of the Meter Box:, a) PO/ Work Order No with date, b) Property of &ldquo;JBVNL&rdquo;, c) Manufacturer&#39;s name, d) Box Serial number, e) Month and Year of manufacture, f) For the use of JPSIP</td>\r\n\t\t\t<td style=\"width:248px\">Serial no. cannot be embossed / engraved</td>\r\n\t\t\t<td style=\"width:183px\">We shall provide all the details with engraved/embossed on the Meter Box Cover only. And the Meter Box Serial number (which is progressive) shall be printed / marked on the meter box cover form inside., Kindly confirm the acceptance.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">SBD &amp; Cost Estimation committee decided Bidder shall show prospective long-term Positive profitability and their balance should be positive in last 5 years. However if the audited balance sheet is not available than what document&nbsp; will be acceptable&nbsp; in order to authenticate&nbsp; their&nbsp; soundness&nbsp; net worth need to be decide after discussion with World Bank and IT-PMO team</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">305</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Smart Meters,24.3 (d),226</td>\r\n\t\t\t<td style=\"width:249px\">The ETBC shall be extended by minimum 50mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td style=\"width:248px\">ETBC of 50 mm size</td>\r\n\t\t\t<td style=\"width:183px\">As Meter is to be supplied inside the Meter Box therefore terminal block with minimum 30 mm extension below plane surface of the terminal block will also be sufficient to accommodate the cable. Kindly accept the same.</td>\r\n\t\t\t<td style=\"width:167px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">306</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Meter Box,36.1.2 (ii), 36.1.2 (c ),252253</td>\r\n\t\t\t<td style=\"width:249px\">Technical Requirement: Degree of Protection to be be IP55,General construction: The meter Box shall have roof tapering down to both the sides for easy flow of rainwater and shall have IP 55 degree of protection for affording protection against dust and water.</td>\r\n\t\t\t<td style=\"width:248px\">IP 55</td>\r\n\t\t\t<td style=\"width:183px\">We request you that please also accept IP 54 degree of protection for the Meter Box. Kindly confirm.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">307</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Meter Box,36.1.2 (c ), GTP S. No. 6,253</td>\r\n\t\t\t<td style=\"width:249px\">General construction: the thickness of the box shall not be less than 3mm on the load bearing side (i.e., back side of the box) and other sides, door and roof shall not be less than 2.5 mm., BASE: 3mm &amp; COVER: 2.5 mm</td>\r\n\t\t\t<td style=\"width:248px\">These requirements are contradictory</td>\r\n\t\t\t<td style=\"width:183px\">Please amend the GTP in line with clause no. 36.1.2 (C)&nbsp; of meter box technical specification. So that we can provide thickness according to the technical specification. &nbsp;, Kindly confirm the acceptability of the same.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">2 mm thickness to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">308</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2: Tech&nbsp; Specs. 3 Ph. 4 W WC Meter Box,36.1.2 (i),253</td>\r\n\t\t\t<td style=\"width:249px\">General construction: the for fixing of Box on flat wall, 4 Nos. 5mm diameter 40mm long, pan head self- taping screws and washers shall be provided by the supplier with every Box. 4 Nos. plastic fixing plugs of 50mm length suitable for self-tapping screws shall also be provided.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Please also accept the box fixing screws with 4 to 5mm (+/- 0.5 mm tolerance) dia and 40mm (+/- 3mm tolerance) long, this shall be more than sufficient. Please confirm the acceptability of the same.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:126px\">309</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">NAME PLATE AND MARKING: the following information shall be clearly and indelibly embossed/engraved (not printed) on the cover and base of the Meter Box:, a) PO/ Work Order No with date, b) Property of &ldquo;JBVNL&rdquo;, c) Manufacturer&#39;s name, d) Box Serial number, e) Month and Year of manufacture, f) For the use of JPSIP</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Serial no. cannot be embossed / engraved.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">We shall provide all the details with engraved/embossed on the Meter Box Cover only. And the Meter Box Serial number (which is progressive) shall be printed / marked on the meter box cover., Kindly confirm the acceptance.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">SBD &amp; Cost Estimation committee decided Bidder shall show prospective long-term Positive profitability and their balance should be positive in last 5 years. However if the audited balance sheet is not available than what document&nbsp; will be acceptable&nbsp; in order to authenticate&nbsp; their&nbsp; soundness&nbsp; net worth need to be decide after discussion with World Bank and IT-PMO team</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Meter Box,36.1.2,255</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">310</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-2:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Type Test:, The sample shall comply with flammability requirements of category FVo/Vo as per respective standards, Technical Requirement: flammability requirement as FV 2.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Requirements are contradictory.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please amend the Type test requirement in clause 36.1.3 (vii) in line with clause no. 36.1.2 (iii)&nbsp; of Meter Box Technical Specification., Kindly confirm the acceptability of the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">As per IS to be provided</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">As per IS to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W WC Meter Box,36.1.3 (vii), 36.1.2 (iii),256, 252</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">311</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The ETBC shall be extended by minimum 50mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">ETBC of 50 mm size</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">As Meter is to be supplied inside the Meter Box therefore terminal block with minimum 30 mm extension below plane surface of the terminal block will also be sufficient to accommodate the cable., Kindly accept the same.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">The ETBC shall be extended by minimum 30mm below plane surface of the terminal block with suitable sealing arrangement of terminal cover</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Tech&nbsp; Specs. 3 Ph. 4 W LT CT Smart Meters,44.3 (d),275</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">312</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">CONSTRUCTIONAL FEATURE OF METER BOX:, both the chambers of box shall be independent from each other., if any portion of box is closed it shall not be possible to approach it by opening the other portion and vice-versa.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Independent door for both the chambers are not safe for ingress protection of dust and water</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">As the Meter Box shall have two chambers, upper chamber to house 3 phase meter and lower chamber to house 04 nos. ring type LT CTs. So in that case, as per specification requirement of both chambers independent from each other is not safe for ingress of protection (IP).&nbsp; We shall provide the Meter Box with upper chamber overlapped on the lower chamber, for ingress protection of dust and water., So we request you to please delete these clauses and kindly confirm.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">Tech&nbsp; Specs. of SMC Box,56, -19.2, 2nd Para, 19.2, 4th Para,300</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">313</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">CONSTRUCTIONAL FEATURE OF METER BOX: it shall be moulded in a single piece forming the body of the Meter Box and CT chamber with SMC lid/shed fitted with the base by two nos. concealed brass hinges.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Brass material hinges</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Please also accept Stainless steel hinges to be fitted with the meter Box body base and the cover.&nbsp;Stainless steel has more strength as compared to brass and has corrosion resistance properties.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">Tech&nbsp; Specs. of SMC Box,19.2,300</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">314</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">CONSTRUCTIONAL FEATURE OF METER BOX: the box should have a front door opening with a window provided with toughened glass of minimum 4.0 mm thickness for viewing and taking meter reading., CONSTRUCTIONAL FEATURE OF METER BOX: the body of the Meter Box shall have such construction that while installing on the grouted bolts of base-wall, the top surfaces of the box shall have little tapering shape frame centre towards both sides of the meter box so that easy flow of rainwater etc. is facilitated, the meter box shall have four wall mounting bracket with proper screws to fix with the bottom base and provision for Four nos. holes each of 6 mm. dia.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">4.00 mm thickness glass, Requirements are contradictory.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please also accept the viewing Window in polycarbonate material having minimum thickness of 2.0mm., Kindly confirm the acceptability of the same., Please amend the clause no. 19.2, 9th para in line with 12th para of Meter Box technical specification. And delete the requirement as mentioned at 9th para of clause no. 19.2.&nbsp;, Kindly confirm the acceptability of the same.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:92px\">Tech&nbsp; Specs. of SMC Box,19.2, 6th Para, 19.2, 9th Para, 12th Para,300</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">315</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">RATING PLATE:, the manufacturers should Screen Print the following information on each meter box, &middot;&nbsp; Name of Manufacturer, &middot;&nbsp; Year of manufacturing, &middot;&nbsp; Type of Meter, &middot;&nbsp; PO NO with Date, &middot;&nbsp; Meter Box Number, &middot;&nbsp; Property of &ldquo;JBVNL&rdquo;, &middot;&nbsp; For the use of IPDS</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Printing of information on Box, Further, we could not understand the requirement of the detail of &lsquo;Type of Meter&rsquo; on the SMC box.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Following details shall be provided as printed on metallic name plate duly riveted on meter box cover., &middot;&nbsp; Name of Manufacturer, &middot;&nbsp; Year of manufacturing, &middot;&nbsp; Type of Meter, &middot;&nbsp; PO NO with Date, &middot;&nbsp; Property of &ldquo;JBVNL&rdquo;, &middot;&nbsp; For the use of IPDS, We shall provide serial no. of Meter Box &lsquo;Printed / Marked&rsquo; on the Meter Box Cover., Please clarify &lsquo;Type of Meter&rsquo;. OR &lsquo;Type of Meter&rsquo; should be replaced by &lsquo;Rating of CTs&rsquo;., Kindly confirm the acceptance.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">Tech&nbsp; Specs. of SMC Box,19.4,301</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:186px\">316</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">RFP Volume Section VII &ndash; Technical Annexure-3: Tech&nbsp; Specs. of SMC Box,56.0 (18.1),300</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Meter boxes shall consist of two separate chambers, one suitable to accommodate LT TVM and other suitable for installation of 4 nos. single core, single ratio, ring type Current Transformers (CTs) of current ratios ranging from 100/5 A - 400/5A&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">LT CTs requirement not clear</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please clarify whether supply of external CT&rsquo;s are in Bid scope or not?, In case CTs are also in scope of supply please provide detailed specifications and drawings of CT ratio (100/5A-400/5A) and their split up quantity., Mounting dimensions, outer Size, internal Diameter, distance from the CT centre to base, burden etc. and JBVNL&rsquo;s approved vendor are required.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Pls refer amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters up to 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">317</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s HPL Electric &amp; Power</td>\r\n\t\t\t<td style=\"width:92px\">General</td>\r\n\t\t\t<td style=\"width:249px\">TTB (Test Terminal Block)</td>\r\n\t\t\t<td style=\"width:248px\">TTB requirement not clear</td>\r\n\t\t\t<td style=\"width:183px\">Please clarify whether TTB (Test terminal Block) is in Bid scope of supply or not? In case if same is to be supplied please provide approved Vendor for the same.</td>\r\n\t\t\t<td style=\"width:167px\">TTB is under this RFP scope</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">TTB is under this RFP scope as per suitable application</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:139px\">318</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Cannonade</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">197PricePart,2.3 IT Software, Schedule No. 2</td>\r\n\t\t\t<td style=\"width:249px\">2.3.1 Application Software</td>\r\n\t\t\t<td style=\"width:248px\">In Clause 2.3.1.1 total consumer mentioned is 3,62,655 where as in clause 2.3.1.2 the quantity mentioned is 3,51,710.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">2.3.1 Application Software</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">2.3.1 Application Software</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:49px; width:249px\">2.3.1.1 One-time Head end System (HES) base software perpetual license for 3,62,655 consumers (Scalable up to 5,00,000 consumers)</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm the quantity for HES perpetual License.</td>\r\n\t\t\t<td style=\"width:167px\">2.3.1.1 One-time Head end System (HES) base software perpetual license for 3,51,710 consumers (Scalable up to 10,00,000 consumers)</td>\r\n\t\t\t<td style=\"width:193px\">2.3.1.1 One-time Head end System (HES) base software perpetual license for 3,51,710 consumers (Scalable up to 10,00,000 consumers)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">2.3.1.2 One-time Head end System (HES) end points perpetual license (will be paid on actual nodes in lot of 5000 each) -- Quantity: 3,51,710</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">2.3.1.2 One-time Head end System (HES) end points perpetual license (will be paid on actual nodes in lot of 5000 each) -- Quantity: 3,51,710</td>\r\n\t\t\t<td style=\"width:193px\">2.3.1.2 One-time Head end System (HES) end points perpetual license (will be paid on actual nodes in lot of 5000 each) -- Quantity: 3,51,710</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">319</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197Price Part,2.1.1 Meters, Schedule No. 2</td>\r\n\t\t\t<td style=\"width:249px\">All the meter item described as with &ldquo; ***** RF Communication Module (Excl. NIC card) *****&rdquo;</td>\r\n\t\t\t<td style=\"width:248px\">Price for NIC already asked as a separate line item. Kindly amend the details as &ldquo;without RF NIC Card&rdquo;, else there could be error of quoting NIC price in 2 places.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">320</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">197Price Part,5.6.1.1 O&amp;M and FMS, Schedule No. 4A</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Monthly Cloud Hosting Charges for HES/NMS application on cloud provided by Bidder</td>\r\n\t\t\t<td style=\"width:248px\">1. Please confirm whether we can use any cloud without MeiTY guideline. Will it be a private or public cloud.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Technical specification doesn&#39;t specify anything related to cloud requirement.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Cloud as per MeiTY guideline to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">2. Does the bidder need to provide a full DC / DR environment for this? Expected scale (number of meters) to be catered by this deployment.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"8\" style=\"height:436px\">321</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197Techni-cal Part, Table 3 - Eligibility and Qualification Criteria for Single Bidder (without JV)</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to &hellip;</td>\r\n\t\t\t<td style=\"width:248px\">Please amend the Clause for Document required as below:</td>\r\n\t\t\t<td style=\"width:183px\">As per Non-Disclosure Agreement with the international clients, it is not possible to submit the Purchase Order copies/ contract agreement/LoI/LoA etc.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:193px\">SBD &amp; Cost Estimation committee decided Bidder shall show prospective long-term Positive profitability and their balance should be positive in last 5 years. However if the audited balance sheet is not available than what document&nbsp; will be acceptable&nbsp; in o</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">Sl No. 4.2C Specific Experience</td>\r\n\t\t\t<td style=\"width:249px\">Document Required</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:92px\">,60</td>\r\n\t\t\t<td style=\"width:249px\">(a) Form EXP4.2 (b)</td>\r\n\t\t\t<td style=\"width:248px\">(a) Form EXP4.2(b) Specific Experience</td>\r\n\t\t\t<td style=\"width:183px\">However we can submit the performance certificates on client&#39;s letter head and can provide the client&#39;s contact details or site visit as require.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(b) Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement /Completion / Performance / Supply Completion Certificate.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(b) Purchase orders</td>\r\n\t\t\t<td style=\"width:248px\">(c) Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">1. Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t\t<td style=\"width:248px\">JBVNL may contact the concern utility directly to verify.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">3. Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">322</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,Schedule No. 4.&nbsp;&nbsp; Installation and Other Services Sl no 4.2.1.1,117</td>\r\n\t\t\t<td style=\"width:249px\">Installation and commissioning of DCU / Gateway / Routers / Access Points or Other Network components for setting up RF Mesh Canopy along with necessary accessories /Hardware for fixing Quantity: 3517</td>\r\n\t\t\t<td style=\"width:248px\">In Technical RFP, the quantity for Gateway/DCU/ Routers/Access Points or Other Network components is mentioned as 3517. But in Price bid(197PricePart.xlsx), schedule 4 the quantity is &quot;0&quot;.</td>\r\n\t\t\t<td style=\"width:183px\">Quantity of RF field devices will depend on solution provider&#39;s architecture. It is better to keep it as 1 lot. Please amend suitably.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">323</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,Schedule No. 4A.&nbsp;&nbsp; O&amp;M and FMS Services Sl no 5.1.1,119</td>\r\n\t\t\t<td style=\"width:249px\">Network Backhaul - Quantity: 3517</td>\r\n\t\t\t<td style=\"width:248px\">In Technical RFP, the quantity for 4G Communication between DCU/ Collector and HES with Fall-back arrangement for 1st, 2nd, 3rd, 4th, 5th is 3517, whereas in Price bid(197PricePart.xlsx), schedule 4A the quantity is &quot;0&quot;. Please clarify</td>\r\n\t\t\t<td style=\"width:183px\">Quantity of RF field devices will depend on solution provider&#39;s architecture. It is better to keep it as 1 lot. Please amend suitably.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:81px\">324</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">197TechnicalPart,1.3.2.1 ,139</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The redundancy mechanism of HES and MDM and their disaster recovery plan shall also be described by the Bidder.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">MDM is not in scope of this RFP. Kindly delete the same</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:167px\">The redundancy mechanism of HES and It&#39;s disaster recovery plan shall also be described by the Bidder.</td>\r\n\t\t\t<td style=\"width:193px\">The redundancy mechanism of HES and It&#39;s disaster recovery plan shall also be described by the Bidder.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">325</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,1.3.3.3,143</td>\r\n\t\t\t<td style=\"width:249px\">Resistance to heat and fire</td>\r\n\t\t\t<td style=\"width:248px\">Our field devices will be with metallic enclosure. This test is not applicable for metallic enclosures, hence not possible to provide any test certificate for the same. If any bidder providing field devices with plastic enclosure this clause will be valid for them.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly amend suitably.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">326</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">197TechnicalPart,1.3.4.2 ,150</td>\r\n\t\t\t<td style=\"width:249px\">AMI profile shall support remote connect / disconnect, load control, time sync, parameters configuration et cetera.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">HES will be integrated with the MDM. There will be further integration of MDM with ERP. These required functionalities will get triggered from ERP to MDM and HES will execute the same.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Kindly amend suitably.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">These features shall be triggered to individual device, group of devices and / or entire network from ERP system.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">327</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,1.3.4.3,151</td>\r\n\t\t\t<td style=\"width:249px\">HES shall provide support for importing devices and associated information from third party systems like SAP, GIS, Oracle, MDMS etc.</td>\r\n\t\t\t<td style=\"width:248px\">HES will be integrated with MDMS and MDM will import the relevant information from 3rd party systems.</td>\r\n\t\t\t<td style=\"width:183px\">Kindly delete/amend this clause</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">328</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,1.3.5.1,152</td>\r\n\t\t\t<td style=\"width:249px\">4. Ability for utility through user interface to set up alarm and event notifications that can be directed to a combination of configurable email addresses, cellular text messages or phone numbers.</td>\r\n\t\t\t<td style=\"width:248px\">This is a feature set of MDM.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">This should be incorporated in the MDM functionalities and should be deleted from this RFP scope.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">329</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,1.4.1.3,157</td>\r\n\t\t\t<td style=\"width:249px\">Post completion of Smart Meter installation, it will be the responsibility of the AMI Implementation Agency to ensure that the master data of the AMI system (Meter and Consumer Details) is in sync with that of the legacy billing Systems</td>\r\n\t\t\t<td style=\"width:248px\">Master Data to be maintained at MDM level.</td>\r\n\t\t\t<td style=\"width:183px\">This should be incorporated in the MDM functionalities and should be deleted from this RFP scope.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:204px\">330</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">197TechnicalPart,1.1,164</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Measurement process of SLAs not clearly defined in this RFP</td>\r\n\t\t\t<td style=\"width:248px\">Please incorporate the following under the SLA table,</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">The ultimate objective of AMI system is to have all the data at MDM level, so SLA are to be measured at MDM level only. This will ensure proper integration of HES &amp; MDM. Kindly amend suitably.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:174px; width:248px\">For data availability (1,2 and 3) related SLA, MDMs should be able to generate reports. For request -response related SLA parameters (4 ,5,6 ,7 and 12) the test shall be performed by selecting meter / group of meters from the MDMs by sending the command and receiving response at MDM. For event related SLA (8,9 and 10) and Firmware upgrade (11), the test shall be carried out as per the discretion of utility.&nbsp; The all above SLA results shall be measured at MDMs level. HES shall provide the request information for measuring these SLAs at MDMs level.&nbsp;&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">331</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart,1.3 (e),135</td>\r\n\t\t\t<td style=\"width:249px\">In case MDM implementation gets delayed due to any reason, the successful Bidder shall provide Billing Determinants to existing Billing Applications of the Employer</td>\r\n\t\t\t<td style=\"width:248px\">HES can provide the billing determinant without VEE as VEE is the part of MDM.&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;Please confirm</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">332</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">197TechnicalPart.pdf,1.3 (7),136</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">7. Integration with existing legacy systems and upcoming DISCOM systems including Metering, Billing and Collection, MDMS, etc. Systems after finalization of Blueprint document</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">HES will collect data from field devices and pass on to MDM and HES will pass all the data / commands received from MDM to the field devices. HES need to be integrated only with MDM</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please delete this clause as HES will only integrate with MDM and all other legacy / upcoming applications will integrate with MDM. This is also well specified in CEA guideline of 2016</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to privide the billing diterminants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">333</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart.pdf,Figure 1,137</td>\r\n\t\t\t<td style=\"width:249px\">Figure 1 General Architecture of AMI System and Integration with Other System</td>\r\n\t\t\t<td style=\"width:248px\">The figure provided is not clear, please provide in a higher resolution file</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per technical specification</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:91px\">334</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">197TechnicalPart.pdf,1.3.3.4 ,147</td>\r\n\t\t\t<td style=\"width:249px\">Accessories for DCU/ Gateway/ Routers/ Access Points,</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">It is the responsibility of RF mesh communication provider to bring data to HES with the required SLA. These accessories may not be required in each location and hence, will add to the cost of the product even if not required. The accessories to be made optional to meet the requirement.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Please amend the clause accordingly.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&bull; Wired antenna with cable length as specified with Roof mounting for both RF and cellular antennas.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">&bull; DCU/ Gateway/ Routers/ Access Points should have suitable mounting arrangement for wall or pole mounting.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">335</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart.pdf,1.3.4.2,151</td>\r\n\t\t\t<td style=\"width:249px\">5. AMI profile shall support collection of missing data and reconcile the missing data with available data</td>\r\n\t\t\t<td style=\"width:248px\">HES passes the data received from the meters to MDM, MDM keeps track of all the data of field devices and send on demand data reads to fill the missing data.</td>\r\n\t\t\t<td style=\"width:183px\">Please amend the clause accordingly.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">336</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td style=\"width:92px\">197TechnicalPart.pdf,1.3.7,156</td>\r\n\t\t\t<td style=\"width:249px\">viii. Any additional reports required during the tenure of contract shall be developed and made available online</td>\r\n\t\t\t<td style=\"width:248px\">All the required data will be made available by NMS / HES to MDM for reporting functionality. This will depend on the future requirement whether future reports to be catered by HES or MDM.</td>\r\n\t\t\t<td style=\"width:183px\">Please amend the clause accordingly.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:106px\">337</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Cyanconnode</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">3. Evaluation &ndash; Financial Part (b) Life Cycle Costs&nbsp;&nbsp; Page 63</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The O&amp;M cost of each year will be converted into NPV at a Discount rate of 10% for the purposes of evaluation. Further, the NPV cost shall be calculated as on the date of opening of financial bid. Thus, the O&amp;M cost of the first year shall be reduced by 2 years and so on.</td>\r\n\t\t\t<td style=\"width:248px\">Request you to share the formula to be used for NPV cost calculation and give an example to arrive the NPV cost of project wrt JBVNL RFP cost components.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">To understand the impact of NPV cost in Financial evaluation.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">NPV calculation method is (Cash Flow for O&amp;M Part)/ (1+Discount Rate)^Time Period. HES hosting for 1 year to be consider only for 1st year</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">What all cost components of schedule 4A will be used for NPV calculation?</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">338</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">197 Technical Part, 1.3.2.2</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Secure network protocols and technologies such as DTLS, TLS, VPN or IPSEC shall be appropriately used to meet the security requirements as per IS16444.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">We propose a robust cryptographic protection in standard based PKI framework using standard formats of certificates (X.509) as per RFC 5280, DTLS , standard cryptographic algorithms ,such as AES-256, Elliptic Curve Digital Signature Algorithm (ECDSA), Elliptic curve Diffie-Hellman (ECDH) protocol, and Secure Hash Algorithm (SHA2)-256.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Smart Grid at this scale should have security implemented to all the layers of network.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">NETWORK SECURITY, 140</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:96px\">339</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">197 Technical Part, 1.3.3.4. ADDITIONAL REQUIREMENTS FOR RF MESH COMMUNICATION ON 865-867 MHZ ,DCU / GATEWAY / ROUTER / ACCESS POINT SPECIFICATIONS Constructional Specifications&nbsp; , 144</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP67 compliant&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">We request to modify the said clause by Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP65 compliant&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Considering Global practices, we believe that IP65 Standard for Access Point is more justifiable.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP65 compliant.</td>\r\n\t\t\t<td style=\"width:193px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP65 compliant.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">340</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Technical Part Section III 2.1 and 2,2, Evaluation and Qualification Criteria , Pg 50</td>\r\n\t\t\t<td style=\"width:249px\">All qualification criterias</td>\r\n\t\t\t<td style=\"width:248px\">We understand that for Global companies we can submit global/parent company credentials in support of these&nbsp; crireia</td>\r\n\t\t\t<td style=\"width:183px\">Clarification needed as global credentials&nbsp; should be considered</td>\r\n\t\t\t<td style=\"width:167px\">Yes, Provided the bidder qualifies as per criteria mentioned in bid document</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes, Provided the bidder qualifies as per criteria mentioned in bid document</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">341</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Technical Part Section III 2.1 and 2,2, Evaluation and Qualification Criteria, Pg61</td>\r\n\t\t\t<td style=\"width:249px\">Technical qualification 4.1 and 4.2 a, b and currently the RFP allows bidders to meet qualification for network 4.2 c via subcontractor credentials while metering credentials as per 4.1 and 4.2 a and b need to be via bidder itself.</td>\r\n\t\t\t<td style=\"width:248px\">Network is the heart of an RF Mesh based AMI solution and as such a network provider should also be allowed to use meter provider as a sub-contractor and use there credential for meter related qualification criteria under 4.1 and 4.2 a and b</td>\r\n\t\t\t<td style=\"width:183px\">Equal opportunity to bid&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">342</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Technical Part Section III , Section VII Scope of Work, Pg 136</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Pt 7. Integration with existing legacy systems and upcoming DISCOM systems including Metering, Billing and Collection, MDMS, etc. Systems after finalization of Blueprint document.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Kindly provide&nbsp; details of systems with which integration would be needed .</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">It would be difficult to do a cost estimate of necessary integration effort without some reasonable information&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e. SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to provide the billing determinants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing determinants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">343</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Technical Part Section III, Section VII Scope of Work, Pg 136</td>\r\n\t\t\t<td style=\"width:249px\">Pt 8Development of dashboard, MIS Reports to be finalized during blue printing.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Request to provide some information to form a broad scoping of dashboard, MIS, reports requirements</td>\r\n\t\t\t<td style=\"width:183px\">It would be difficult to do a cost estimate of necessary effort without some reasonable information/scoping</td>\r\n\t\t\t<td style=\"width:167px\">All the MIS and Dashboard in full-fledged AMI system would require, however final report MIS requirement will be finalized with JBVNL after award</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">All the MIS and Dashboard in full-fledged AMI system would require, however final report MIS requirement will be finalized with JBVNL after award</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:201px\">344</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:92px\">Section II - Bid Data Sheet, ITB, 26.2, 46</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall submit the following documents in hardcopy before the Bid Submission date &amp; time and also scanned copy of these along with other documents shall be uploaded on e-procurement portal.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:248px\">1. Whether any Bid Document fee is required to be submitted in the form of DD?</td>\r\n\t\t\t<td style=\"width:183px\">We understand there is no Bid Document fee for this Tender.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">1. Bid Document fee in the form of DD</td>\r\n\t\t\t<td style=\"width:183px\">Other than original Bid Security in the form of Bank Guarantee and Power of Attorney&nbsp; rest of all documents has to be uploaded on JBVNL procurement portal&nbsp; as per the ITB clause no. 12.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">2. EMD in the form of Bank Guarantee as per format provided in Bid Forms.</td>\r\n\t\t\t<td style=\"width:183px\">Request you to kindly confirm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">3. Power of Attorney</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:141px\">345</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Similarly, in Section II - Bid Data Sheet, ITB, 26.2 (k), 47</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">In case original copy of tender fee (if applicable) is not submitted by bidder up to above mentioned cut-off date and time then tender will not be considered.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">1. Whether any Bid Document fee is required to be submitted in the form of DD?</td>\r\n\t\t\t<td style=\"width:183px\">We understand there is no Bid Document fee for this Tender.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">No Tender Fee required but EMD/Bid security/BG is to be submitted as applicable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:183px\">Other than original Bid Security in the form of Bank Guarantee and Power of Attorney&nbsp; rest of all documents has to be uploaded on JBVNL procurement portal&nbsp; as per the ITB clause no. 12.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:183px\">Request you to kindly confirm.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">346</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-1, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications of Single Phase whole Current Smart Meters and with Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Current Rating 5-30 Amp.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We request you to kindly amend 1Ph Whole Current Smart Meter Rating as 10-60 Amp.</td>\r\n\t\t\t<td style=\"width:167px\">1Ph whole current Smart meter - Current Rating 10-60 Amp.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">1Ph Smart meter current rating as 5-30A</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">347</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-2, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications of Three Phase whole Current Smart Meter of Accuracy Class 1.0 with Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Current Rating 20-100 Amp.&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">We request 3Ph Whole Current Smart Meter Rating as 10-60 Amp.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">3 Ph Whole Current Smart Meter Rating as 10-60 Amp.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">348</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-3, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications for CT operated AC Three Phase Four Wire Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Separate Technical specifications for Consumer Meter and DT Meter is missing&nbsp; in Tender document</td>\r\n\t\t\t<td style=\"width:183px\">Please arrange to provide detailed Separate Technical Specifications for Consumer metering and DT Metering for the BOQ Line Item No. 2.1.1.3 &amp; 2.1.1.4</td>\r\n\t\t\t<td style=\"width:167px\">Refer Aneexure-3 for specs</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Refer Aneexure-3 for specs</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">349</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td style=\"width:92px\">Appendix to Technical Part: Plant, Technical Annexure-4, 77</td>\r\n\t\t\t<td style=\"width:249px\">Technical specifications for CTPT operated AC Three Phase Four Wire HT Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Box</td>\r\n\t\t\t<td style=\"width:248px\">Technical specifications of HT CTPT Operated Meter is missing in Tender document</td>\r\n\t\t\t<td style=\"width:183px\">Please arrange to provide detailed Separate Technical Specifications of CTPT operated AC Three Phase Four Wire HT Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Box for Consumer and Feeder Metering for BOQ Line Item No. 2.1.1.5 &amp; 2.1.1.6</td>\r\n\t\t\t<td style=\"width:167px\">Refer Annexure-4 for Specs</td>\r\n\t\t\t<td style=\"width:83px\">Addendum</td>\r\n\t\t\t<td style=\"width:193px\">Refer Annexure-4 for Specs</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"6\" style=\"height:121px\">350</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:92px\">Appendix to Financial Part, Section-I Instructions to the Bidder, 115</td>\r\n\t\t\t<td style=\"width:249px\">Service Cable</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:248px\">Detailed specifications and JBVNL&rsquo;s approved Vendors list is missing</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:183px\">Please arrange to provide detailed specifications and JBVNL&rsquo;s approved vendor list of LT XLPE cables and for other line items too.</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:167px\">To be included from J&amp;k tender</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">Addendum</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:193px\">Provided in the amendments</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">LT XLPE Cable 2 Core 10mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">LT XLPE Cable 3.5 Core 25mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">LT XLPE Cable 3.5 Core 50mm2 (Armoured)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">351</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Itron</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Background and Information Materials, , 322</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Project Area Latitude &amp; Longitude of DT</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Detailed and accurate list of Single Phase &amp; Three Phase consumers are missing</td>\r\n\t\t\t<td style=\"width:183px\">Please arrange to provide the detailed accurate list of Single Phase, Three Phase consumers along with HT Consumers / Feeder Meters.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">GIS based data will be made available to the Successful bidder. Bidder has to the site survey prior to submit the detailed Engineering Document. Any discrepancy need to brought in notice of JBVNL</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:183px\">However, DT Meter GPS Coordinates are provided in the Tender Documents.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">352</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 1 1.3.6. Requirement for IT Infrastructure on Cloud, 153</td>\r\n\t\t\t<td style=\"width:249px\">3.4 (RDBMS) -&gt; MS SQL 2016 Std Ed.</td>\r\n\t\t\t<td style=\"width:248px\">Apart from MS SQL whether Oracle can also be acceptable or not, please kindly confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">Apart from MS SQL whether Oracle can also be acceptable or not, please kindly confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Oracle is Acceptable</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Oracle is Acceptable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">353</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 10. Battery, 178</td>\r\n\t\t\t<td style=\"width:249px\">In case battery removal or total discharge same should not affect the working &amp; memory of the meter even in case of single wire power</td>\r\n\t\t\t<td style=\"width:248px\">On the condition of Single Wire Power, smart meter can directly switch off. Whether this can be acceptable for the single wire power condition nor not ,please confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">On the condition of Single Wire Power, smart meter can directly switch off. Whether this can be acceptable for the single wire power condition nor not ,please confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">354</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 11. Single wire power, 189</td>\r\n\t\t\t<td style=\"width:249px\">Meter should have disconnected the load switch to avoid load drawn in above condition</td>\r\n\t\t\t<td style=\"width:248px\">On the condition of Single Wire Power, smart meter can directly switch off. Whether this can be acceptable for the single wire power condition nor not ,please confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">On the condition of Single Wire Power, smart meter can directly switch off. Whether this can be acceptable for the single wire power condition nor not ,please confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">355</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 13. Load Control Switch, 227</td>\r\n\t\t\t<td style=\"width:249px\">e) The make of the load switch should be Gruner / KG Technologies (German) only and same shall be confirmed by the bidder during tendering</td>\r\n\t\t\t<td style=\"width:248px\">The make of the load switch should be Gruner / KG Technologies (German) or equivalent and same shall be confirmed by the bidder during tendering. Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">The make of the load switch should be Gruner / KG Technologies (German) or equivalent and same shall be confirmed by the bidder during tendering. Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Any Equivalent make may be used subject to prior approval of JBVNL before award of contract.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Any Equivalent make may be used subject to prior approval of JBVNL before award of contract.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">356</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 17. Component Specification, 200</td>\r\n\t\t\t<td style=\"width:249px\">component requirements</td>\r\n\t\t\t<td style=\"width:248px\">It suggested that all components brand requirements could be added with &quot;or equivalent and same shall be confirmed by the bidder during tendering&quot; Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">It suggested that all components brand requirements could be added with &quot;or equivalent and same shall be confirmed by the bidder during tendering&quot; Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer amendment</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Pls refre amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">357</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 38. Limits of error due to influence quantities, 175</td>\r\n\t\t\t<td style=\"width:249px\">p) External magnetic field 0.5 T</td>\r\n\t\t\t<td style=\"width:248px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:183px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">358</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 5.36 Limits of error due to influence quantities, 222</td>\r\n\t\t\t<td style=\"width:249px\">p) External magnetic field 0.5 T</td>\r\n\t\t\t<td style=\"width:248px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:183px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">359</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter, 36. Limits of error due to influence quantities, 273</td>\r\n\t\t\t<td style=\"width:249px\">p) External magnetic field 0.5 T</td>\r\n\t\t\t<td style=\"width:248px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:183px\">In IS13779 and CBIP325, the External Magnetic field is 0.2T, please kindly modify 0.5T into 0.2T</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">360</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Dongfang India</td>\r\n\t\t\t<td style=\"width:92px\">DCU, 1.3.3.1. GENERAL REQUIREMENT OF ROUTERS / REPEATERS / ACCESS POINTS / GATEWAY / DCU BASED RF MESH NETWORK, 142</td>\r\n\t\t\t<td style=\"width:249px\">The equipment shall be weatherproof, dustproof and constructed for outdoor installation on poles (minimum rating: IP-65).</td>\r\n\t\t\t<td style=\"width:248px\">If bid are using DCU, then DCU with DCU Box can comply with IP55, Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:183px\">If bid are using DCU, then DCU with DCU Box can comply with IP55, Whether this can be acceptable, please confirm yes or no</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions i.e. IP 65</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">361</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">ITB/Cl. 11/Bid Security to be submitted before opening of technical bid</td>\r\n\t\t\t<td style=\"width:249px\">INR 24.3 Million</td>\r\n\t\t\t<td style=\"width:248px\">NSIC/MSME unit may kindly be exempted for this clause.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">EMD will be exempted as Govt. guidelines as applicable</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">EMD will be exempted as Govt. guidelines as applicable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">362</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section 1-ITB/Eligibility &amp; Qualification Criteria /Table-2/ Cl. 3/Financial Situation / Sub.Cl. 3.2 /Average Annual Turnover&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual turnover of INR 1943 Million in last three financial years. / At least one partner Must meet at least 70&amp; &amp; other 30% of the requirement</td>\r\n\t\t\t<td style=\"width:248px\">Please allow to submit and meet Financial and Technical Requirement jointly in totality by both the JV partners.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">363</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section 1-ITB/ Eligibility &amp; Qualification Criteria /Table-2/ Cl. 4/ Technical qualification Req. / Sub. Cl. 4.1 /</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Please confirm and allow bidder to submit BIS of any one type of electricity meter before commencement of&nbsp; supply OR on going BIS testing of any one type of rating shall be considered&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certificate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">General Experience&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;(b) Availability of IS 16444 certificate for at least one type</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">of electricity meter&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">364</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section 1-ITB/ Eligibility &amp; Qualification Criteria /Table-2/ Cl. 4/ Technical qualification Req. / Sub. Cl. 4.2a / Specific Experience</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM. Must meet one partner</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm that bidder who manufactured &amp; supplied more than 11 Lac energy meters (any rating /type) in last 7 years are eligible to submit bid</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">365</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Section 1-ITB/ Eligibility &amp; Qualification Criteria /Table-2/ Cl. 4/ Technical qualification Req. / Sub. Cl. 4.2b / Specific Experience</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application. Must meet one partner</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify AMR or AMI meters and the installed and commissioned qty. of meter can be deleted or reduced to less than 10,000 meters Please clarify that whether the Foreign company can be allowed for</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have executed (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:248px\">JV or not. If other partner have manufacturing facilities in India.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">366</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section 1-ITB/ Eligibility &amp; Qualification Criteria /Table-2/ Cl. 4/ Technical qualification Req. / Sub. Cl. 4.2c / Specific Experience (page 55)</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids These nodes shall be in successful operation for at least one year as on the date of submission of bids. The RF mesh technology should have integrated meters of at Joint Venture (JV) is allowed.Maximum partners in a JV shall be two (2).&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Bidder can permit/allow to meet this requirement through a subcontractor. (As specified in Table-3 (without JV)/ page 61 GPRS/NBIOT technology can be allowed if RF not working in particular area</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">367</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section II - Bid Data Sheet/A. General/ ITB 4.1</td>\r\n\t\t\t<td style=\"width:249px\">Joint Venture (JV) is allowed. Maximum partners in a JV shall be two (2).</td>\r\n\t\t\t<td style=\"width:248px\">plase clarify that whether the Foreign company can be allowed for JV or not. If other partner have manufacturing facilities in India.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">This is a NCB. Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">368</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">Section VII &ndash; Scope of work/Cl. 12.0 TYPE TEST/sub Cl./ 1.1</td>\r\n\t\t\t<td style=\"width:249px\">The bidders shall be required to furnish valid type test reports in respect of single phase static energy meter with optical port as per requirement of IS16444:2015 from CPRI or ERDA or NABL accredited laboratory. The type test certificate should not be older than three years as on the date of opening of technocommercial bid. Date of conducting type test will be considered for calclating the age of certificate.</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm and allow bidder to submit type test report before commencement of supply.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certifcate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to furnish BIS for any one type of meter with bid document for meeting the qualifying requirement, however bidder shall submit BIS certifcate of all type of meters before commencement of meter supply. (No type test report to be furnished with bid)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">369</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Pal Mohan</td>\r\n\t\t\t<td style=\"width:92px\">General</td>\r\n\t\t\t<td style=\"width:249px\">Qualification Requirement</td>\r\n\t\t\t<td style=\"width:248px\">We suggest that the contract shall be awarded amongest minimum&nbsp; three bidders/meter manufacturers. L1 bidders should be responsible for complete software and RF canopy and L2 and L3 bidders need to supply meters of same RF Configuration.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">370</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">17.9, 26</td>\r\n\t\t\t<td style=\"width:249px\">In the case of Adjustable Price, prices quoted by the Bidder shall be subject to adjustment during performance of the contract to reflect changes in the cost elements such as labor, material, transport and contractor&rsquo;s equipment in accordance with the procedures specified in the corresponding Appendix to the Contract Agreement. A Bid submitted with a fixed price quotation will not be rejected, but the price adjustment will be treated as zero</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify the relevance of Appendix for Adjustable price as bids with adjustable price will be rejected</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Not applicable as per RFB</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">371</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">17.12, 26</td>\r\n\t\t\t<td style=\"width:249px\">Bidders may like to ascertain availability of tax/duty exemption benefits available in India to the contracts financed under World Bank loan/credits. They are solely responsible for obtaining such benefits which they have considered in their bid and in case of failure to receive such benefits for reasons whatsoever, the Employer will not compensate the bidder (contractor</td>\r\n\t\t\t<td style=\"width:248px\">Customer to support the contractor regarding the necessary certificates to avail tax benefits.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Necessry cerification will be given as per JBVNL/WB organisational policy</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Necessry cerification will be given as per JBVNL/WB organisational policy</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">372</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">19.3, 28</td>\r\n\t\t\t<td style=\"width:249px\">If the award is delayed by a period exceeding fifty-six (56) days beyond the expiry of the initial Bid validity period, the Contract price shall be determined as follows:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Please specify the factor</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Refer clause 19.3(a), page 45.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">(a) in the case of fixed price contracts, the Contract price shall be the Bid price adjusted by the factor specified in the BDS;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">373</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">B. FUNCTIONAL, ARCHITECTURAL AND PERFORMANCE-REQUIREMENTS OF AMI SYSTEM-1.3, 135</td>\r\n\t\t\t<td style=\"width:249px\">Integration of different devices/equipment/software covered in scope of this contract with each other as per stated functional requirements</td>\r\n\t\t\t<td style=\"width:248px\">Please give details of the existing hardware /software</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Already given required details</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Already given required details</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">374</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">1.3, 135</td>\r\n\t\t\t<td style=\"width:249px\">Dismantling of old meters and associated accessories and return of dismantled materials to JBVNL&rsquo;s stores in Ranchi.</td>\r\n\t\t\t<td style=\"width:248px\">Please provide details of the no.of old meters ,accessories etc</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">It can not be asecertain as this stage, bidder to collect and return old meters as and when bidder replace the old meter</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">It can not be asecertain as this stage, bidder to collect and return old meters as and when bidder replace the old meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">375</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">1.3, 136</td>\r\n\t\t\t<td style=\"width:249px\">Deployment of HES/NMS application on Cloud . Bidder has to provide HES on Cloud on monthly chargeable basis till JBVNL provide/arrange the cloud service provider for the period not more than 1 year. The period may be extended further subject to mutual agreement of JBVNL and Bidder by reviewing the upcoming Cloud services possibility under another RFP</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify whether Bidder will be paid for the extended period</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Yes, He will be paid if period extended</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Yes, He will be paid if period extended</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:256px\">376</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">1.3, 136</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">Integration with existing legacy systems and upcoming DISCOM systems including Metering, Billing and Collection, MDMS, etc. Systems after finalization of Blueprint document</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">Please give us details of existing legacy systems</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">There is Home Grown Billing Application developed by M/s SRIT is being used as on date. JBVNL is planning to have Enterprise level Unified Billing application&nbsp; i.e SAP ISU / Oracle&nbsp; etc. in future.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:167px\">Bidder has to ensure to privide the billing diterminants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t\t<td style=\"width:193px\">Bidder has to ensure to privide the billing diterminants&nbsp; in soft copy or API form to facilitate the existing&nbsp; bill till the new billing system deployed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:167px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing diterminants to pass to Billing System.</td>\r\n\t\t\t<td style=\"width:193px\">We understand that , after integration of HES System with forthcoming MDM will take care of billing diterminants to pass to Billing System.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">377</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">Special Conditions of Contract, 636, PCC 19,&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The Contractor in his contract with OEM of NIC Cards/ Router /DCU / Collector shall include provisions that JBVNL shall reserve the right to sign an agreement directly with the OEM/sub-contractor of the NIC cards/Routers/DCU/Collectors for the purchase of any additional such equipment beyond the order quantity or any future requirements. An unpriced copy such contract will be provided to JBVNL</td>\r\n\t\t\t<td style=\"width:248px\">The installation/integration/Commissioning etc of any such items directly purchased by JBVNL from the OEM shall not be in the contarctors scope</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bidder will facilitate in the contract agreement if utility want to do so</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder will facilitate in the contract agreement if utility want to do so</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:226px\">378</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s KEC International</td>\r\n\t\t\t<td style=\"width:92px\">9.3, 551</td>\r\n\t\t\t<td style=\"width:249px\">The Contractor shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which such authorities or undertakings require the Contractor to obtain in its name and which are necessary for the performance of the Contract, including, without limitation, visas for the Contractor&rsquo;s and Subcontractor&rsquo;s personnel and entry permits for all imported Contractor&rsquo;s Equipment. The Contractor shall acquire all other permits, approvals and/or licenses that are not the responsibility of the Employer under GCC Sub-Clause 10.3 hereof and that are necessary for the performance of the Contract</td>\r\n\t\t\t<td style=\"width:248px\">Please exclude all the approvals/permits etc from the contractors scope.Also please provide encumbrance free site to the contractor</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Utility will facilitate, however, all the pemits / approvals / licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Utility will facilitate, however, all the pemits / approvals / licenses to be acquired and paid by bidder only and may load the cost in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:101px\">379</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">However, MSME Meter Manufacturer Partner&nbsp; must meet 10% of the MAAT Requirement.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">&nbsp;MAAT&nbsp; - a.) The Lead Bidder Partner must have 7500 Million InR MAAT in last three Years.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b.)&nbsp; Other Partners must have&nbsp; 24000 Million MAAT in last three Years; and in case any&nbsp; MSME Meter Manufacturer Partner&nbsp; must meet 10% of the Requirement.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">turnover (MAAT) of INR 1943</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">Million in last three (03)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">financial years ending 31st</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">March 2018.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">380</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet:(i) the following cash-flow requirement: INR 194 Million</td>\r\n\t\t\t<td style=\"width:248px\">However, MSME Smart Meter Manufacturer Partner must meet 10% of the Cash Flow Requirement.</td>\r\n\t\t\t<td style=\"width:183px\">However, MSME Smart Meter Manufacturer Partner must meet 10% of the Cash Flow Requirement.</td>\r\n\t\t\t<td style=\"width:167px\">MSME may take rebate in EMD fee as per MSME/NSIC GoI guidelines.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">MSME may take rebate in EMD fee as per MSME/NSIC GoI guidelines.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"8\" style=\"height:246px\">381</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture&nbsp; partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:248px\">Add: - (a) However, any MSME Smart Meter Manufacturer Partner must have manufactured and Supplies Smart Meters in the Last Five (5) Years in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d) Any MSME Meter Manufacturer Partner&nbsp; shall have atleast lifetime membership twith any NABL accrediated Laboratory and must have Availability of inhouse NABL accrediated Laboratory during production for the Project Supplies.</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:183px\">Add: - (a) However, any MSME Smart Meter Manufacturer Partner must have manufactured and Supplies Smart Meters in the Last Five (5) Years in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (d) Any MSME Meter Manufacturer Partner &nbsp;shall have atleast lifetime membership twith any NABL accrediated Laboratory and must have Availability of inhouse NABL accrediated Laboratory during production for the Project Supplies.&nbsp;&nbsp;&nbsp; f.)&nbsp; Must have Manufactured / Supplied at Least 36,000 Smart Meters with AMI for any Project in Indi Geography.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; g.) Bidder Manufacturer / Supplier&nbsp; Must not have any large Supply&nbsp; completion pending completion for any Quantity total of more than 1 Million&nbsp; Static Meters or Smart Meters against Orders of Clients for more than 3 Months at the time of submission of Bids..&nbsp;&nbsp;&nbsp; ( This is to Protect JBVNL Projects against possible delays&nbsp; with huge backlog of manufacturing and supply completion&nbsp; pending for any Bidder partners)&nbsp;</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"8\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">(c) Availability of meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">repair facility in India since last 3 years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">(d) Availability of inhouse</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">NABL accredited Laboratory</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">(e) Availability should have quality certifications for its manufacturing and. services function.: ISO 9001, ISO 14001, ISO 18001 and ISO 27001. and Minimum CMMI Level 3 (Minumu) or higher certification.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">382</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and atleast 25,000 shall be LTCT TVMor HTCT TVM.</td>\r\n\t\t\t<td style=\"width:248px\">Add: - (a) However, any MSME Smart Meter Manufacturer Partner must have manufactured and Supplied at least 36,000 Smart Meters in the Last Five (5) Years in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Add: - (a) However, any MSME Smart Meter Manufacturer Partner must have manufactured and Supplied at least 36,000 Smart Meters in the Last Five (5) Years in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:316px\">383</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must have successfully manufactured and supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">To be Deleted:&nbsp; &quot;The scope of any one of the above contracts shall include installation of MDAS or HES application. &quot; as this may be the scope of SIA as in R-APDRP Projects so large in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; To be Added:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a). However,&nbsp;&nbsp; The Bidder MSME Partner must have successfully manufactured and&nbsp; supplied, at least 50,000&nbsp; Smart meters with AMI in the last 7 years, out of which the bidder must have installed and commissioned at least 10,000 smart meters as part of any Smart Grid project in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b. Smart Meter manufacturer must have facilities of manufacture and Supply of at least 50,000 Smart Meters with AMI per Month for JBVNL Project.</td>\r\n\t\t\t<td style=\"width:183px\">To be Deleted: &nbsp;&quot;The scope of any one of the above contracts shall include installation of MDAS or HES application. &quot; as this may be the scope of SIA as in R-APDRP Projects so large in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; To be Added:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a). However,&nbsp;&nbsp; The Bidder MSME Partner must have successfully manufactured and&nbsp; supplied, at least 50,000&nbsp; Smart meters with AMI in the last 7 years, out of which the bidder must have installed and commissioned at least 10,000 smart meters as part of any Smart Grid project in India.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b. Smart Meter manufacturer must have facilities of manufacture and Supply of at least 50,000 Smart Meters with AMI per Month for JBVNL Project.</td>\r\n\t\t\t<td style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must hav eexecuted (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:196px\">384</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">A. Eligibility Criteria Updations Inclusions for Considerations.</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids These nodes shall be in successful operation for at least one year as on the date of submission of bids. The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">Observation: This elegibility is highly restrictive to Global Experiences with very few such instances in foreign geography while India has seen keen intiatives by the GoI over the last five years finally initiating demands for Smart Meters only in the last two years specially with single large SI initiations by EESL. Hence Imperative&nbsp; to delete this clause existing description and Replace with the following:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a).&nbsp; &quot;Bidder shall be an experienced System Integrator for at least more than last Five years, in the field of Power, Information Technology, Communication / Electonic Component Manufacturer for Smart Meters and supplier of and implementor os similar&nbsp; goods and services for any Govt. Institution / PSU / Department / Utility in India AND must have valid Authorization certificate of the Meter Manufacturer {OEM Partner}, for the supply of similar intended goods &amp; services. &quot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b). Bidder shall submit along with copy of supply orders, sanction &amp; works Orders ssued by such institution and Auditor Certificate for similar goods and services Projects totalling over 5000 Million Indian Rupees undertaken over the last 7 Years ending 31-March-2018). Individual Client&rsquo;s PO/ WO/ LOI/ LOA/ Contract/ Performance certificate and contact details of clients,&nbsp;&nbsp; Auditor Certificates for Manufacturing and Supply quantity / Services shall be submitted alongwith BID.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; c). Availability should have quality certifications for its manufacturing and. services function.: ISO 9001, ISO 14001, ISO 18001 and ISO 27001. and Minimum CMMI Level 3 (Minumu) or higher certification.</td>\r\n\t\t\t<td style=\"width:183px\">Observation: This elegibility is highly restrictive to Global Experiences with very few such instances in foreign geography while India has seen keen intiatives by the GoI over the last five years finally initiating demands for Smart Meters only in the last two years specially with single large SI initiations by EESL. Hence Imperative&nbsp; to delete this clause existing description and Replace with the following:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a).&nbsp; &quot;Bidder shall be an experienced System Integrator for at least more than last Five years, in the field of Power, Information Technology, Communication / Electonic Component Manufacturer for Smart Meters and supplier of and implementor os similar&nbsp; goods and services for any Govt. Institution / PSU / Department / Utility in India AND must have valid Authorization certificate of the Meter Manufacturer {OEM Partner}, for the supply of similar intended goods &amp; services. &quot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b). Bidder shall submit along with copy of supply orders, sanction &amp; works Orders ssued by such institution and Auditor Certificate for similar goods and services Projects totalling over 5000 Million Indian Rupees undertaken over the last 7 Years ending 31-March-2018). Individual Client&rsquo;s PO/ WO/ LOI/ LOA/ Contract/ Performance certificate and contact details of clients,&nbsp;&nbsp; Auditor Certificates for Manufacturing and Supply quantity / Services shall be submitted alongwith BID.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; c). Availability should have quality certifications for its manufacturing and. services function.: ISO 9001, ISO 14001, ISO 18001 and ISO 27001. and Minimum CMMI Level 3 (Minumu) or higher certification.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">385</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">General - HES &amp; Cloud page Pg.116, 135</td>\r\n\t\t\t<td style=\"width:249px\">General - HES &amp; Cloud</td>\r\n\t\t\t<td style=\"width:248px\">Bidder shall provide for HES and Cloud Infrastructure for initial 100,000 Smart Meters Coverage and provide for scalability on Monthly requirement in lots of 100,000&nbsp; finally scalable upto 1 Million Smart Meter Coverage as per requirement of Utility. Bidder shall have provision for Multiple HES and integration facility with Multiple makes and multiple HES if required for the System and ensure multiple makes Smart Meter and AMI deployement for the Project.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:346px\">386</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">DCU&nbsp; - Specifications ; Nos. and N/w Surveys, Ref. Pg. 117 - 4.2.1;&nbsp;&nbsp;&nbsp; 1.3.3.1</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">DCU&nbsp; - Specifications ; Nos. and N/w Surveys,&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">1. Line Item for Installations &amp; Commisioning:&nbsp;&nbsp; 1. Network Communication Status in Project Area (GPRS / RF , Consumer and Meter Locations) in the Project Area of Coverage and submit Network Design Engineering Document for Approvals,&nbsp; ensuring complete Project Area Coverage as per requirement by JbVNL covering all meter nos as specified in the Schedule for the Project.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:105px; width:248px\">The DCU must have the following Provions:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1.&nbsp; Ethernet Port (Digital India Coverage&nbsp; - comm provisions) ; 2. DLMS Compliance (Inter-Potability)&nbsp;&nbsp;&nbsp; 3. Provision for Multiple SIMs (upto 3).&nbsp; 4.&nbsp; IP54 Compliant.&nbsp;&nbsp; 5. Meter Data vailability for at least 15 days Cycle in case of any communication failures.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px; width:248px\">2.&nbsp; Bidder must undertake to supply all capitol items / equipment items for the Project for a period of at least 2 years from the date of completion of the Project Schedule.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:241px\">387</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Price Schedule&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Price Schedule&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">1. Price Schedule - BoQ line items&nbsp; as Rate Contract for this period for upto 20% of Smart Meters and allied AMI equipment (DCU , Comm Module, ) and Support Services as required during this Period.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px; width:248px\">2. Payment Terms:&nbsp; a.&nbsp; Increase Mobilization Advance to 20%.&nbsp; Billing &amp; Payments: a. 75%&nbsp; Payable on Delivery of (Smart Meters, Meters with AMI,) Prorate (95% billed as per EWX)with adjustment of Advance (20%) Prorate) and 100% of applicable Taxes Payable b. 15% Payable on Availability of Data on HES at JbVNL. 4. 10% on Completion of at least 96% (of&nbsp; total nos. of&nbsp; Smart Meters) Meter Data Availability at HES and Integration. Security BG is anyway applicable as per JBVNL&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">388</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">SLA</td>\r\n\t\t\t<td style=\"width:249px\">SLA</td>\r\n\t\t\t<td style=\"width:248px\">3. Meter Data Availability at HES:&nbsp;&nbsp;&nbsp;&nbsp; 1.&nbsp; &lt;=90% (Monthly) then No Payments due in month for non-communicating Meter location.&nbsp; 2. &gt;90% - &lt;96% then upto 10% retention on applicable charges for non communicating meters. 3. &gt;=96% Meter data Avilability at HES then no retention / penalty. ( Meter should not be in-active due to JbVNL / Customer related reasons).</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:271px\">389</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Manpower Resources and Training:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Manpower Resources and Training:</td>\r\n\t\t\t<td style=\"width:248px\">Bider must provide for its Resources to include at least 30% of Manpower resources from / in the State which should be incremented , every year by at least 20% till at least 90% by the last year of Project Period. Bidder must specify requisite&nbsp; and Suffiecient Periodic Training of Trainers and Resources, (Annually / Six Monthly ), enabling Skill Development&nbsp; and updations for all stages and operations during the Project.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px; width:248px\">Bidder to submit detailed document on Design and documentaion for each of the list of Training Programmes provisioned with expected nos. of Resources to be Trained as Trainers and Trainees along with Skill Updation Programmes provided periodically during the Project Period.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:286px\">390</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">Smart Meter Specs</td>\r\n\t\t\t<td style=\"width:249px\">Smart Meter Specs</td>\r\n\t\t\t<td style=\"width:248px\">1. Smart Meters must be offered with complete compliance as per IS-16444 and AMI Functionality Compliance as per CEA Guidelines (2016 and later).&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2. The Smart Meters must be in compliance to DLMS Standards and DCUs, HES must ensure Inter-Porability of Smart Meters and AMI with Multiple ma.kes as per specifications for the Project.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 3.&nbsp;&nbsp; Specification Ratings of Whole Current Meters must be maintained as per&nbsp; Standards and Practices for India Geography UTilies as 5-30A for Single Phase and 10-60A for Three Phase whole Current Meters. Any changes in these shall be restrictive to certain ininitaions of interest segregrationly only for such projects.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">391</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s BEL, Bangalore</td>\r\n\t\t\t<td style=\"width:92px\">JV ITB-4.1</td>\r\n\t\t\t<td style=\"width:249px\">JV ITB-4.1</td>\r\n\t\t\t<td style=\"width:248px\">The Nos of JV Partners shall be maximum of 5 JV Partners including Lead Bidder Partner.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (In view of Large Project, Multi-Technology and Manufacturing Partners with requisite Capacity and Capability to Deliver and Successfully implemet the Project Speedily and Viably.</td>\r\n\t\t\t<td style=\"width:183px\">MSME Bidder partner shall be exempted for tende Fee and EMD in case of State / PSU&nbsp; JV Lead Partener.</td>\r\n\t\t\t<td style=\"width:167px\">MSME may take rebate in EMD fee as per MSME/NSIC GoI guidelines.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">MSME may take rebate in EMD fee as per MSME/NSIC GoI guidelines.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:226px\">392</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">PQR, Page 56/ Page 60,&nbsp; Clause 4.2C ( Table 2 or Table 3)</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol(including NIC and Network Components along with respective Software i.e. HES, NMS)&nbsp;for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:248px\">The bidder of RF Mesh must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:183px\">Can we have Sub Contractors separately for&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions. No Change in exisitng clause.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:248px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:183px\">1. RF Mesh Protocol with NMS</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:183px\">2. NIC Card and HES</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">393</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">1.3.3.1. GENERAL REQUIREMENT OF ROUTERS / REPEATERS / ACCESS POINTS / GATEWAY / DCU BASED RF MESH NETWORK</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">All the communication network equipment (DCU/Gateway/router/Repeater/Access Point) shall be certified by WPC, Government of India for operation in license free frequency band.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">All the communication network equipment shall use RF NIC Card (Meter/ DCU/Gateway/router/Repeater/Access Point) certified by WPC, Government of India for operation in license free frequency band.</td>\r\n\t\t\t<td style=\"width:183px\">WPC approves a RF NIC Cards. The DCU/ Router/ Repeater/ Gateway / Access Point using this NIC Card does not rquires separate ETA from WPC.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">The onus for delivering approved equipment from competent authority lies with bidder. At any stage audit can be done for certification.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">The onus for delivering approved equipment from competent authority lies with bidder. At any stage audit can be done for certification.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:183px\">Alternately, We can provide the ETA from WPC for all the Network equipment before start of the work.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">394</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">1.3.3.3. TESTING OF THE DCU /ACCESS POINT</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must provide IP-65 compliance test certificate for DUC/Router / Gateway /Access Point.</td>\r\n\t\t\t<td style=\"width:248px\">The bidder must provide IP-65 compliance test certificate for DUC/Router / Gateway /Access Point before start of the project.</td>\r\n\t\t\t<td style=\"width:183px\">We are in the process of IP 65 Certification.</td>\r\n\t\t\t<td style=\"width:167px\">Equipment should be IP-65 compliant before supply.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Equipement should be IP 65 compliant.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:61px\">395</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">RF MESH BASED NETWORK INTERFACE CARD (NIC), Standard Communication protocols</td>\r\n\t\t\t<td style=\"width:249px\">RF Standard : IEEE 802.15.4g</td>\r\n\t\t\t<td style=\"width:248px\">RF Standard : IEEE 802.15.4g or other WPC/DOT compliant radio protocol</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">RPL : RPL for mesh routing</td>\r\n\t\t\t<td style=\"width:248px\">RPL : RPL for mesh routing or equivalent/ Superior RF Mesh Routing</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">396</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture</td>\r\n\t\t\t<td style=\"width:249px\">Average Annual Turnover</td>\r\n\t\t\t<td style=\"width:248px\">Average Annual Turnover</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">This will allow specialised players who are leaders in Smart Grid Implementation to also participate. In the current turnover only companies not specialised in Smart meter are getting preference.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Table 3 - Eligibility and Qualification Criteria for Single Bidder, Srl 3.2</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t\t<td style=\"width:248px\">Minimum average annual turnover (MAAT) of INR 700 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">397</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Manufacture and supply of electricity meters for at least the last Sevene (07) years</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Smart metering in India Started in 2012 onwards and hence Meter manufacturers specialised in Smart Metering should be given an opportunity to bid.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">Table 3 - Eligibility and Qualification Criteria for Single Bidder, Srl 4.1,a&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">398</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">1.3.2. Communication Infrastructure</td>\r\n\t\t\t<td style=\"width:249px\">Please Define the word Canopy and provide its architecture.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Already provided in Pre-bid meeting</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Already provided in Pre-bid meeting</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">399</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">1.3.3.4. : DCU / GATEWAY / ROUTER / ACCESS POINT SPECIFICATIONS; Communication Specifications</td>\r\n\t\t\t<td style=\"width:249px\">RPL for Mesh Routing</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">There are other more effective routing protocol. We request you to leave this to the implementer and concentrate more on the SLA&#39;s.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">400</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c</td>\r\n\t\t\t<td style=\"width:249px\">In Table 3, you have allowed Clause 4.2 c to be met by a Sub Contractor, the same is not allowed in Table for JV.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub-contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub-contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer.In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent )shall be applicable on the Performance Security</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Sub Contractor clause for JV or no JV should be the same.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">This may kindly be allowed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:271px\">401</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td style=\"width:92px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub-contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub-contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer.In case the successful bidder did not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent )shall be applicable on the Performance Security</td>\r\n\t\t\t<td style=\"width:248px\">The Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub-contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub-contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer.</td>\r\n\t\t\t<td style=\"width:183px\">2 % rebate on Performance Security in case a bidder has not used a Sub Contractor to meet clause 4.2c; should be deleted</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"7\" style=\"height:331px\">402</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:64px\">M/s Wirepas</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:92px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c, Documentation Required</td>\r\n\t\t\t<td style=\"width:249px\">Documentation Required to meet 4.2(c)</td>\r\n\t\t\t<td style=\"width:248px\">Documentation Required to meet 4.2(c)</td>\r\n\t\t\t<td style=\"width:183px\">As this credential can be met mainly through International Expereinces.</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:193px\">SBD &amp; Cost Estimation committee decided Bidder shall show prospective long-term Positive profitability and their balance should be positive in last 5 years. However if the audited balance sheet is not available than what document&nbsp; will be acceptable&nbsp; in o</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">(a) Form EXP-4.2 and</td>\r\n\t\t\t<td style=\"width:248px\">(a) Form EXP-4.2 and</td>\r\n\t\t\t<td style=\"width:183px\">Global Utilites generally don&rsquo;t place the PO / Provide the Credentials/ Performance Certificate directly for the RF Mesh. They only deal with the Meter Manufacturer/ System Integrator.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(b) Purchase Order</td>\r\n\t\t\t<td style=\"width:248px\">(b) Purchase Order ( Any one of the Below)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">1. Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t\t<td style=\"width:248px\">1. Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t\t<td style=\"width:248px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">3. Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.</td>\r\n\t\t\t<td style=\"width:248px\">3. Valid MOU/Letter from Meter Manufacturers or a letter from concerned utility.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">4. Experience from meter Manufacturer / Private organisation should be accepted</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:181px\">403</td>\r\n\t\t\t<td style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page No. 55, Eligibility Criteria</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:248px\">As per our understanding, we will provide supply PO&rsquo;s of 180,000 AMR or AMI meters in Power Distribution Utility(s) / System Integrators in the last 7 years and Performance certificates for 36,000 AMR or AMI meters as part of an AMI/AMR system</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions. No Change in exisitng clause.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:61px\">404</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">1</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">We request you to amend the same as at least 75,000 Smart Metering nodes / AMR in Power Distribution Utility / System Integrators in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">Page No.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">55</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:211px\">405</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page 141</td>\r\n\t\t\t<td style=\"width:249px\">GENERAL REQUIREMENT OF ROUTERS / REPEATERS / ACCESS POINTS / GATEWAY / DCU BASED RF MESH NETWORK</td>\r\n\t\t\t<td style=\"width:248px\">We would request you to accept the communication network equipment shall use&nbsp; RF&nbsp; NIC&nbsp; Card (Meter/ DCU / Gateway / router / Repeater / Access Point) certified by WPC, Government of India for operation in license free frequency band.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Sub contracting is not allowed except for point no.4.2.c, JV can be formed max. with 2 partner</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">1.3.3.1.</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">All the communication network equipment (DCU/Gateway/router/Repeater/Access Point) shall be certified by WPC, Government of India for operation in license free frequency band.</td>\r\n\t\t\t<td style=\"width:248px\">Can we have Sub Contractors separately for</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">1. RF Mesh Protocol with NMS</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">2. NIC Card and HES</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:71px\">406</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page 143</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We request you to amend</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Agreed</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">IP 65 compliance required</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">1.3.3.3.</td>\r\n\t\t\t<td style=\"width:249px\">Bidder must provide IP-65 compliance test</td>\r\n\t\t\t<td style=\"width:248px\">Providing IP-65 compliance test report at the time of release of PO.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">certificate for DUC/Router / Gateway /Access Point.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">407</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Page 51</td>\r\n\t\t\t<td style=\"width:249px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture Table 3 - Eligibility and Qualification Criteria for Single Bidder, Srl 4.1,a</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request to amend the clause as Manufacture or Supply of electricity meters for at least the last Seven (07) years</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:121px\">408</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">Page 53</td>\r\n\t\t\t<td style=\"width:249px\">Table 2 - Eligibility and Qualification Criteria for Joint Venture</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">We request you to amend the Average Annual Turnover Minimum average annual turnover (MAAT) of INR&nbsp; 700 Million in last three (03) financial years ending 31st March 2018</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">Table 3 - Eligibility and Qualification Criteria for Single Bidder, Srl 3.2</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">Average Annual Turnover Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">years ending 31st March 2018.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:236px\">409</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">PQR,-Page 56/</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission&nbsp; of&nbsp; bids These nodes shall be in successful operation for at least one year as on the date of submission of bids. The RF mesh technology should have</td>\r\n\t\t\t<td style=\"width:248px\">The bidder of RF Mesh must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:167px\">Query seems incomplete</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"4\" style=\"width:193px\">Query seems incomplete</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">Page 60, Clause 4.2C</td>\r\n\t\t\t<td style=\"width:249px\">integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">(Table 2 or</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">Table 3)</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:41px\">410</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page 138</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Communication Infrastructure</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Request you to provide more details</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Details are alerday given in RFP</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Details are alerday given in RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">1.3.2.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:61px\">411</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page 144</td>\r\n\t\t\t<td style=\"width:249px\">DCU / GATEWAY / ROUTER / ACCESS POINT SPECIFICATIONS;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">There is more effective routing protocol.&nbsp; We request you to leave this to the implementer and concentrate more on the SLA&#39;s.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">This is to be in compliance with BIS and CEA Guidelines</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">This is to be in compliance with BIS and CEA Guidelines</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">1.3.3.4.</td>\r\n\t\t\t<td style=\"width:249px\">Communication Specifications</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">&lsquo;RPL for Mesh Routing</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:336px\">412</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Page 144</td>\r\n\t\t\t<td style=\"width:249px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c</td>\r\n\t\t\t<td style=\"width:248px\">Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub- contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub- contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer. In case the successful bidder did&nbsp; not use sub-contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent) shall be applicable on the Performance Security</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Sub contracting is not allowed except for point no.4.2.c. JV can be formed max. with 2 partner</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Sub contracting is not allowed except for point no.4.2.c of table 3. JV can be formed max. with 2 partner. Rebate of 2% deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">The clause should be similar for Sub</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">Table 3, you have allowed Clause 4.2 c to be met by a Sub Contractor, the same is not allowed in Table for JV. This may kindly be allowed</td>\r\n\t\t\t<td style=\"width:248px\">Contractor clause for JV or no JV. Request to amend.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:450px\">413</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Page 144</td>\r\n\t\t\t<td style=\"width:249px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c</td>\r\n\t\t\t<td style=\"width:248px\">Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub- contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub- contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Sub contracting is not allowed except for point no.4.2.c, JV can be formed max. with 2 partner</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Sub contracting is not allowed except for point no.4.2.c of table 3. JV can be formed max. with 2 partner. Rebate of 2% deleted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:271px; width:249px\">The Bidder can meet the requirements specified in clause 4.2 (c) in above table through a sub-contractor. In case the bidder meets this qualification through a sub-contractor, they shall indicate the details of the sub-contractor in Section IV and submit an authorization letter from the sub-contractor in the format specified in Section IV and a MoU/Agreement or any other document clearly indicating the nature of association and responsibilities of the sub-contractor. In the event of award, the bidder and his sub-contractor will be required to sign a tripartite agreement with the Employer. In case the successful bidder did not use sub- contractor&rsquo;s credentials for meeting the qualifying requirements of the bid [i.e. bids as a single entity or JV), a rebate 2% (Two Percent) shall be applicable on the Performance Security</td>\r\n\t\t\t<td style=\"width:248px\">We would request you to remove the below clause of 2 % rebate on&nbsp; Performance Security in case a bidder has not used a Sub Contractor to meet clause 4.2c</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:336px\">414</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s Analogics Tech India Ltd.</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:92px\">Page 144</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Documentation Required to meet 4.2(c)</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">SBD &amp; Cost Estimation committee decided Bidder shall show prospective long-term Positive profitability and their balance should be positive in last 5 years. However if the audited balance sheet is not available than what document&nbsp; will be acceptable&nbsp; in o</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">Table 2, Eligibility Criteria for Joint Venture, Clause 4.2c, Documentation Required</td>\r\n\t\t\t<td style=\"width:248px\">(a) Form EXP-4.2 and</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">(b) Purchase Order (Any one of the Below)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">Documentation Required to meet 4.2(c) (a)Form EXP-4.2 and</td>\r\n\t\t\t<td style=\"width:248px\">1. Copies of Purchase Order/ Work Order</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">/ Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">(b)Purchase Order</td>\r\n\t\t\t<td style=\"width:248px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">1. Copies of Purchase Order/ Work Order / Letter of Intent / Letter of Award / Contract Agreement</td>\r\n\t\t\t<td style=\"width:248px\">3. Valid MOU/Letter from Meter Manufacturers or a letter from concerned utility.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">2. Completion / Performance / Supply Completion Certificate on Client&rsquo;s letterhead.</td>\r\n\t\t\t<td style=\"width:248px\">4. Experience from meter Manufacturer / Private organization should be accepted</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">3. Valid MOU/Letter from Meter Manufacturers and a letter from concerned utility.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We request you to amend the same.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:121px\">415</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">08-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Amazon Internet Services Pvt Ltd.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Eligibility Crietria</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">CSP Criteria</td>\r\n\t\t\t<td style=\"width:248px\">1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The CSP should be empaneled by MEITY</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">With reference to the above mentioned project, we would like to bring to your kind notice that the tender has no mention around the eligibility criteria for selecting the cloud service provider (CSP), expected to host the HES solution. We request your kind self to evaluate the following points and have them incorporated in your tender.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">MeiTY compliend cloud to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:248px\">2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The CSP should be in the Gartner&rsquo;s leaders Quadrant for providing Infrastructure as a&nbsp; Service, for the last 3 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The CSP should have an average turnover of 250 crores for the last 3 years.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:211px\">416</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Eligibility Crietria, page 54-55, Specific Exp.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM.</td>\r\n\t\t\t<td style=\"width:248px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM.</td>\r\n\t\t\t<td style=\"width:183px\">A licensee with AMI experiece would fully understand the challenges of AMI installation, commissioning &amp; operation and would have the capability to offer end-to-end solution. While Meter supply can also be arranged through sub-contacting, life cycle view of AMI deployement should a pre-requisite for the bidder.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:248px\">orElectrical distribution Licenseee having experience in implementation of AMI is technically qualified</td>\r\n\t\t\t<td style=\"width:183px\">Hence, we would request that a distribution licensee with prior experice of AMI should be allowed on its own.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:271px\">417</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">Eligibility Crietria, page 54-55, Specific Exp.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:248px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:183px\">A licensee with AMI experiece would fully understand the challenges of AMI installation, commissioning &amp; operation and would have the capability to offer end-to-end solution. While Meter supply can also be arranged through sub-contacting, life cycle view of AMI deployement should a pre-requisite for the bidder.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:248px\">or</td>\r\n\t\t\t<td style=\"width:183px\">Hence, we would request that a distribution licensee with prior experice of AMI should be allowed on its own.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:248px\">Electrical distribution Licenseee having experience in implementation of AMI is technically qualified</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:321px\">418</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">Eligibility Crietria, page 54-55, Specific Exp.</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:248px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td style=\"width:183px\">A licensee with AMI experiece would fully understand the challenges of AMI installation, commissioning &amp; operation and would have the capability to offer end-to-end solution. While Meter supply can also be arranged through sub-contacting, life cycle view of AMI deployement should a pre-requisite for the bidder.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:60px; width:249px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:248px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:183px\">Hence, we would request that a distribution licensee with prior experice of AMI should be allowed on its own.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">or</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Electrical distribution Licenseee having experience in implementation of AMI is technically qualified</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">419</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Bid data sheet, section II, ITB 4.1</td>\r\n\t\t\t<td style=\"width:249px\">Max. JV partner is 2</td>\r\n\t\t\t<td style=\"width:248px\">Max. JV partners to be Three (3)</td>\r\n\t\t\t<td style=\"width:183px\">As a typical AMI deployement would require a system integrator, Meter supplier and O&amp;M Operator. Hence, It woud be essential that three (3) partners be allowed in the JV.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">420</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Scope of activities</td>\r\n\t\t\t<td style=\"width:249px\">O&amp;M supports of AMI system for 60 months&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">O&amp;M supports of AMI system for 120 months&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">Based on our first hand experince of AMI deployement, we believe that the investment that JBVNL is making would be best monetized if the O&amp;M horiozon is kept for at least 8-10 years.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"6\" style=\"height:241px\">421</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:92px\">General Experience, table 2,3, point 4.1</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td style=\"width:248px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:183px\">It might restrict the number of meter suppliers to very few. Hence, otherwise capable and experienced meter suppliers may get excluded due to this criteria.&nbsp;</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"6\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t\t<td style=\"width:248px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t\t<td style=\"width:248px\">(b) DELETED</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(c) Availability of meter repair facility in India since last 3 years</td>\r\n\t\t\t<td style=\"width:248px\">(c) Availability of meter repair facility in India since last 3 years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(d) Availability of in-house NABL accredited Laboratory</td>\r\n\t\t\t<td style=\"width:248px\">(d) Availability of in-house NABL accredited Laboratory</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">(e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum) certification.</td>\r\n\t\t\t<td style=\"width:248px\">(e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum) certification.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">422</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 2.a.</td>\r\n\t\t\t<td style=\"width:249px\">Ten percent (10%) of the total EXW amount as an interest free advance payment against receipt of invoice</td>\r\n\t\t\t<td style=\"width:248px\">Twenty percent (20%) of the total EXW amount as an interest free advance payment against receipt of invoice</td>\r\n\t\t\t<td style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">423</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 2.c.</td>\r\n\t\t\t<td style=\"width:249px\">Twenty percent (20%) of the total or pro rata EXW amount upon data availability in HES, within forty-five (45) days after receipt of invoice.</td>\r\n\t\t\t<td style=\"width:248px\">Ten percent (10%) of the total or pro rata EXW amount upon data availability in HES, within thirty [30] days after receipt of invoice.</td>\r\n\t\t\t<td style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">424</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 3.a.</td>\r\n\t\t\t<td style=\"width:249px\">Ten percent (10%) of the total design services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.</td>\r\n\t\t\t<td style=\"width:248px\">Twenty percent (20%) of the total design services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.</td>\r\n\t\t\t<td style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">425</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 3.b.</td>\r\n\t\t\t<td style=\"width:249px\">Ninety percent (90%) of the total or pro rata design services amount upon acceptance of design/report in accordance with GCC Clause 20 by the Project Manager within forty-five (45) days after receipt of invoice.</td>\r\n\t\t\t<td style=\"width:248px\">Eighty percent (80%) of the total or pro rata design services amount upon acceptance of design/report in accordance with GCC Clause 20 by the Project Manager within thirty [30] days after receipt of invoice.</td>\r\n\t\t\t<td style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">426</td>\r\n\t\t\t<td style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 4.a.</td>\r\n\t\t\t<td style=\"width:249px\">Ten percent (10%) of the total installation services amount as an advance payment against receipt of invoice,</td>\r\n\t\t\t<td style=\"width:248px\">Twenty percent (20%) of the total installation services amount as an advance payment against receipt of invoice,</td>\r\n\t\t\t<td style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:136px\">427</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">06-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s India Power Corp. Ltd.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Terms and Procedure of Payment, Schedule no. 4A</td>\r\n\t\t\t<td style=\"width:249px\">Twenty-five percent (25%) of the total accepted O&amp;M, FMS &amp; Communication services amount for the relevant months, at the end of every quarter, subject to satisfactory services rendered during the quarter.</td>\r\n\t\t\t<td style=\"width:248px\">Twenty-five percent (25%) of the total accepted O&amp;M, FMS &amp; Communication services amount for the relevant months, at the end of every quarter, subject to satisfactory services rendered during the quarter.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">It would facilitate better working capital management for the bidder.&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:249px\">100% of Taxes and Duties will be reimbursed on submission of bill with documentary evidence of payment within forty-five [45] days of receipt of documents.</td>\r\n\t\t\t<td style=\"width:248px\">100% of Taxes and Duties will be reimbursed on submission of bill with documentary evidence of payment within thirty [30] days of receipt of documents.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:151px\">428</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,SCOPE OF SUPPLY, Technical Specification,Page 168 of, Tech. Annexure-1, Page No. 214 of, Tech. Annexure-2, Page No. 267 of Tech. Annexure-3</td>\r\n\t\t\t<td style=\"width:249px\">Table 1 &ndash; Phase wise bifurcation of meters on page 7 includes six types of meters, only Technical Specification of Single Phase Whole Current Smart Meters and Meter Box Technical Specification for Whole-Current A.C. Three Phase Four Wire Static Watt Hour Smart Meter of Accuracy Class 1.0 with Separate Polycarbonate Molded Meter Box, Technical Specification for CT operated AC Three Phase Four Wire Static Watt Hour Smart Meter of Accuracy Class 0.5s with Separate Meter Box</td>\r\n\t\t\t<td style=\"width:248px\">Please provide technical specification of meters for HT Consumer, DT Consumer and Feeder.</td>\r\n\t\t\t<td style=\"width:183px\">Technical specifications required to study &amp; ensure compliance for bidding &amp;execution purpose.| JBVNL agreed to provide details soon</td>\r\n\t\t\t<td style=\"width:167px\">Pls refer Specs Annexure-3 &amp; Annex-4</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Pls refer Specs Annexure-3 &amp; Annex-4</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">429</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 4.0 Supply/Installation SystemData,Page No. 174&nbsp; Point No. 30</td>\r\n\t\t\t<td style=\"width:249px\">kVAh Calculation a) Meter shall be programmed for &ldquo;Lag only configuration&rdquo; i.e. lead to be treated as unity PF for KVAh calculation</td>\r\n\t\t\t<td style=\"width:248px\">Does it mean capacitive load to be treated as active consumption, please clarify the details.</td>\r\n\t\t\t<td style=\"width:183px\">Need clarification| Agreed to provide clarification</td>\r\n\t\t\t<td style=\"width:167px\">Pls follow as per applicable standard - CBIP 325</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Pls follow as per applicable standard - CBIP 325</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">430</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 4.0 Supply/Installation System Data,Page No. 174&nbsp; Point No. 36</td>\r\n\t\t\t<td style=\"width:249px\">Alternative data retrieval In case of meter damage, if data is not available in MDMS/HES, then data stored in meter memory (NVM) should be retrieved using a jig. Bidder need to be provide such jigs free of cost (1 jig on each 10000 meters). Jig should be designed such that NVM can be plugged easily on it for data retrieval</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify if a special communication port which doesn&rsquo;t require power during data retrieval is acceptable.</td>\r\n\t\t\t<td style=\"width:183px\">Since using that port doesn&rsquo;t require any additional infrastructure| JBVNL will review internally and response</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">431</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 6.0 Constructional Requirement,Page No. 178&nbsp; Point No. 13 (e)</td>\r\n\t\t\t<td style=\"width:249px\">The make of the load switch should be of Gruner / KG Technologies (German) make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884</td>\r\n\t\t\t<td style=\"width:248px\">Since two brands are not enough for lead times and can create monopoly We request to add other brand with similar electrical and mechanical characters should be acceptable which comply to UC1/UC2 or UC3 as per JBVNL requirement.</td>\r\n\t\t\t<td style=\"width:183px\">Its Important for fair competition to accept equivalent quality componets for better sourcing for bidders.| JBVNL agreed that relay will not be restricted to two make and will provide specification like UC1 or UC2 and bidder can choose their own make.</td>\r\n\t\t\t<td style=\"width:167px\">Equivalent make accepatble comply to UC2 or better for 1 Ph &amp; 3 Ph WC Smart Energy meter</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Equivalent make of UC1 for 1Ph meter and UC2 for 3 phase meter is acceptable</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">432</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. No. 1.3.1 - Smart Meters,Page 137 Point (iv)</td>\r\n\t\t\t<td style=\"width:249px\">Support both Smart-prepaid and post-paid metering as per CEA regulations</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify if the meter should be STS compliant and also Prepaid functionality is needed at meter end or HES.</td>\r\n\t\t\t<td style=\"width:183px\">Since the achievement of prepaid functionality at meter or HES will have different cost implication so need clarification. JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">No Separate Prepaid engine required however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display. No STS complaint meter required.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">No Separate Prepaid engine required however meter and comm. System should support the required data transactions and writing of balance values and dates in meter memory for display. No STS complaint meter required.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">433</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 8.0 Anti-tamper and Fraud Detection Requirement,Page 188 Point No. 7&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Protection against HV spark: Meter shall continue to record energy or log the event, in case it is disturbed externally using a spark gun/ ignition coil. Up to 35 KV meter should remain immune. Communication port shall also be immune up to 35KV with cover in place. The Meter shall comply to HV spark when Meter installed in field conditions</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify the voltage level of test for each type of meter., (a)&nbsp; Since there should a limit upto which meter should sustain the Peak, Generally Pan India utility ask for 35KV sustainability., (b)&nbsp; Since meter is installed in filled with box you mean to say test will be done on meter for 35kv with box.</td>\r\n\t\t\t<td style=\"width:183px\">Need clarification on both points since it impact cost and design confirmations &amp; compliance.| JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">As per IS to be provided</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">As per IS to be provided</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">434</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 1.6.3General Constructions,Page 206 Point No. (o)</td>\r\n\t\t\t<td style=\"width:249px\">Suitable overlapping (approx. 10mm) shall be provided between base and cover to avoid access to the meter or its accessories inside the meter box by any means after sealing the box.</td>\r\n\t\t\t<td style=\"width:248px\">Please clarify the exact meaning.</td>\r\n\t\t\t<td style=\"width:183px\">JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">435</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 1.3.3.4&nbsp;&nbsp; Additional Requirement for RF Mesh communication on 865-867 MHz&nbsp; ,page 145Point No. 4 of Constructional Specification</td>\r\n\t\t\t<td style=\"width:249px\">Water and dust proofing for the DCU/ Gateway/ Routers/ Access Points shall be provided and shall be minimum IP67 compliant</td>\r\n\t\t\t<td style=\"width:248px\">We will install meters of DCU with box to avoid theft and protection so IP67 should be realized by enclosure, kindly confirm acceptable.</td>\r\n\t\t\t<td style=\"width:183px\">As per field conditions DCU is installed with Box, so IP test should be applied at field conditions as IP-67 is very stringent&nbsp; test to be applicable direct on equipment. | JBVNL agreed that IP-67 compliance need to be with box.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">IP 65 and above</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:186px\">436</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">,General,Other questions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">1.&nbsp;&nbsp;&nbsp; Please clarify if external connect/disconnect device need to be supplied for CT operated meters., 2.&nbsp;&nbsp;&nbsp; Please clarify the Accuracy Class for reactive energy.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">Since specs is not found so we need details to bid the tender as it has technical &amp; commercial impact.| JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">1. No connect/disconnect device required for CT operated meters.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Please note, for LTCT operated meters upto 100 KVA transformer bidder has to quote for thread thru type meters (40-200A) as per IS 16444 (Part 1) &amp; relevant IS 15959 and for above 100 KVA transformers LTCT operated meters with suitable resin cast ring type CT and SMC type double chamber box to be provided.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:167px\">2. 0.5s Accuracy class</td>\r\n\t\t\t<td style=\"width:193px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">Thread thru meter specification enclosed.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:211px\">437</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII, Acronym Table &ndash; B, Functional, architectural and performance requirements of AMI system, Page 134, Cl., 1.1 &ndash; Legal and Regulatory Requirement to be met by the AMI systems</td>\r\n\t\t\t<td style=\"width:249px\">The AMI system MUST comply with the following laws and regulations:</td>\r\n\t\t\t<td style=\"width:248px\">1.Is the AMI system must comply with HES factions listed in the tender documents and laws and regulations cited here? If there is a conflict between this two contents, which one should we comply with?, 2. Cause the cited laws and regulations includes some factions of MDM, like VEE, but MDM is not in the scope of this tender, how to handle this parts of regulations?, 3.&quot;Prepaid Faction&quot; means HES need to support the interface with PPM system or need to achieve relevant prepaid functions?</td>\r\n\t\t\t<td style=\"width:183px\">It confusion that prepaid function need to be supported at meter level or HES level since it has change requisite as per requirements. As also HES has done overlap request of MDM so please clarify function to be implemented&nbsp; at HES.| JBVNL agreed that HES function will be modified since MDM will be separate tender</td>\r\n\t\t\t<td style=\"width:167px\">This should be inline with CEA guidelines and should be able to configure at HES/MDM level</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">This should be inline with CEA guidelines and should be able to configure at HES/MDM level</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">438</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 1.3 Advance Metering Infrastructure (AMI) Systems,Page 135, Point&nbsp; (e)</td>\r\n\t\t\t<td style=\"width:249px\">Integration/interface of the HES/AMI system with MDM System. The MDM system will be implemented by JBVNL through a separate contract (to be funded by the World Bank). In case MDM implementation gets delayed dur to any reason, the successful Bidder shall provide Billing Determinants to existing Billing Applications of the Employer.</td>\r\n\t\t\t<td style=\"width:248px\">Is this tender just need HES (including interface),MDM is not in the scope of this tender and it will be implemented in another tender?</td>\r\n\t\t\t<td style=\"width:183px\">Please clarify | Yes, Clarified MDM will be separate tender and bidder just need to provide HES and from tender JBVNL will remove MDM function and issue a amendment.</td>\r\n\t\t\t<td style=\"width:167px\">MDM will be separate tender, Scope cover upto HES but any integration support would be done by bidder during MDM implementation</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">MDM will be separate tender, Scope cover upto HES but any integration support would be done by bidder during MDM implementation</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:241px\">439</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,Cl. 1.3 Advance Metering Infrastructure (AMI) Systems,Page 136,, Point No. 6</td>\r\n\t\t\t<td style=\"width:249px\">Deployment of HES/NMS application on Cloud. Bidder has to provide HES on Cloud on monthly chargeable basis till JBVNL provide/arrange the cloud service provider for the period not more than 1 year. The period may be extended further subject to mutual agreement of JBVNL and Bidder by reviewing the upcoming Cloud services possibility under another RFP. Details about the cloud sizing requirement may be referred to clause no. 1.3.6.(Requirement of IT infrastructure on cloud)</td>\r\n\t\t\t<td style=\"width:248px\">1. Is NMS required to be a separate/independent system? Or it can be integrated with HES?, 2. Bidder has to provide HES on Cloud for the period not more than 1 year, how many equipment&rsquo;s will be integrated into the system deployed on Cloud?, 3. Is the whole system is deployed on Cloud? No need to purchase hardware server equipment&rsquo;s?, 4. As per understanding Bidder has to provide cloud for 12 months after that Bidder cloud should be stopped &amp; integrate to JBVNL cloud? What about data centre&amp; data recovery centre? Both will be provided on cloud by JBVNL?</td>\r\n\t\t\t<td style=\"width:183px\">Since the doubt asked has commercial impact need clarification on all points.| JBVNL clarified that cloud need to be provided by bidder for one year and it can be extended and JBVNL is coming with another tender for data centre.</td>\r\n\t\t\t<td style=\"width:167px\">NMS to be part of HES system, Bidder to provide full fledge cloud services from MEITY empanelled cloud provider with HES on cloud and migration of data from their cloud to JBVNL cloud</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">NMS to be part of HES system, Bidder to provide full fledge cloud services from MEITY empanelled cloud provider with HES on cloud and migration of data from their cloud to JBVNL cloud</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">440</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII, Cl. 1.3 Advance Metering Infrastructure (AMI) Systems, Page 139,1.3.2.1- General Requirement (Para-4)</td>\r\n\t\t\t<td style=\"width:249px\">The network solution offered by the bidder should have disaster recovery mechanism in place. The redundancy mechanism of HES and MDM and their disaster recovery plan shall also be described by, the Bidder.</td>\r\n\t\t\t<td style=\"width:248px\">Does this tender must include an separate/independent disaster recovery mechanism? OR HES need to have fault tolerance scheme of communication, server and database? There is a big quotation gap between this two proposals. Also confirm DC &amp; DRC both need to implemented on cloud by bidder for 12 months and then for both JBVNL will provide cloud where bidder has to shift?</td>\r\n\t\t\t<td style=\"width:183px\">Need Clarification.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">DR must be part of cloud services and then migration on another cloud</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">DR must be part of cloud services and then migration on another cloud</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">441</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,1.3.4 &ndash; Head END Systems (HES) ,Page 149, 1.3.4 &ndash; Point No. 7</td>\r\n\t\t\t<td style=\"width:249px\">Security must be part of all the elements of solution. Bidder shall provide detailed description about the proposed security model</td>\r\n\t\t\t<td style=\"width:248px\">Is JBVNL already has KMS(Key Management System)?</td>\r\n\t\t\t<td style=\"width:183px\">Need clarification| JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to propose secure key management system as part of overall solution</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to propose secure key management system as part of overall solution</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">442</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-VII,1.3.4 &ndash; Head END Systems (HES) ,Page 149, 1.3.4 &ndash; Point No. 10</td>\r\n\t\t\t<td style=\"width:249px\">Bidder shall provide technical specifications of canopy elements including hardware and software</td>\r\n\t\t\t<td style=\"width:248px\">What is &quot;canopy elements&quot;? It is also mentioned in the previous chapter.</td>\r\n\t\t\t<td style=\"width:183px\">As it mentioned in Bid no additional cost will be given to build RF canopy in Ranchi for future expansion. Can JBVNL tell how many total caser in Ranchi &amp;what is year on year growth.| JBVNL told the bidder can choose DCU installation, they doesn&rsquo;t mean by canopy elements anything different.</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:101px\">443</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:92px\">SECTION-VII,1.3.4 &ndash; Head END Systems (HES) ,Page 149, 1.3.4 &ndash; Point No. 9</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:249px\">Bidder must work with meter vendors for integration of RF node in smart meters. Bidder must provide the methodology and approach for integration. Integration must include both hardware and protocol</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:248px\">How many kinds of meters from different vendors?</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:183px\">Kindly define PIN diagram for RF Node.| JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">Meter make at JBVNL:</td>\r\n\t\t\t<td rowspan=\"5\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Meter make at JBVNL:</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:167px\">L&amp;T</td>\r\n\t\t\t<td style=\"width:193px\">L&amp;T</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:167px\">Secure</td>\r\n\t\t\t<td style=\"width:193px\">Secure</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:167px\">Genus</td>\r\n\t\t\t<td style=\"width:193px\">Genus</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:167px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:193px\">HPL</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">444</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">,,Other questions</td>\r\n\t\t\t<td style=\"width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">1.Are there any data need to be migrated from the old HES system?, 2.How many years have the old system been running?, 3.How many meters be integrated into the old system?, 4.How many interfaces does the old system have?, 5.Is there is interface between old HES system and CIS system?Has it already achieved file synchronization?</td>\r\n\t\t\t<td style=\"width:183px\">For Bidder need clarification| JBVNL will clarify</td>\r\n\t\t\t<td style=\"width:167px\">No legacy HES system exist for meters under the scope of project.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">No legacy HES system exist for meters under the scope of project.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">445</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-I ITB,Cl. 2.0 Bidder Qualification ,Technical Qualification Requirement, 4.1 ( b), Page No. 54</td>\r\n\t\t\t<td style=\"width:249px\">Availability of IS 16444 certificate for at least one type of electricity meter at time of bidding.</td>\r\n\t\t\t<td style=\"width:248px\">Availability of IS 13779 certificate for at least one type of electricity meter should be acceptable&nbsp; &amp; before placement of Purchase order&nbsp; Bidder should submit &quot;Availability of IS 16444 certificate for at least one type of electricity meter&quot;</td>\r\n\t\t\t<td style=\"width:183px\">IS16444 clarification has just started &amp; need 3-4 months for BIS so we request to ask this at time of ward of contract for fair &amp;healthy competition| JBVNL accepted and agreed that at time of bidding IS-13779 is ok for healthy competion and at time of award bidder need to submit IS-16444</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">446</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-I ITB,Cl. 2.0 Bidder Qualification ,4.2 (c) Page No.&nbsp; 56</td>\r\n\t\t\t<td style=\"width:249px\">The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td style=\"width:248px\">Request to delete this clause for bidding purpose.</td>\r\n\t\t\t<td style=\"width:183px\">This will strict competition Since the project is asking DLMS complaint meter with HES. (end to end submission)| JBVNL agreed to delete this clause</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">447</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">SECTION-I ITB,A.&nbsp;&nbsp; General,Point No. 11 &amp; 21</td>\r\n\t\t\t<td style=\"width:249px\">Bids submitted by a JV (where permitted) shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement;</td>\r\n\t\t\t<td style=\"width:248px\">We request JBVNL to share JV Agreement format to avoid any confusion on acceptance of JV agreement in future.</td>\r\n\t\t\t<td style=\"width:183px\">For bidding purpose | JBVNL agreed to submit format for more clarity.</td>\r\n\t\t\t<td style=\"width:167px\">JBVNL/WB</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">JV agreement to be submit as per RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">448</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Capital Power Systems Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">General</td>\r\n\t\t\t<td style=\"width:249px\">Make &amp; origin of components&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">Measurement chip:-Hi-trend, NXP, Memory Chip:- Rohm, Display:- Holitek, Capacitor:-Walsin, Deki, Battery:- EVE, Ramway, Maxwell, Philips, Crystal:- Raltorn, Communication Module:-Osram</td>\r\n\t\t\t<td style=\"width:183px\">With High lead times in electric components it important to have more options for bidder for reputed makes. Kindly allow its important for smooth execution of project.| JBVNL agreed to include the proposed make and also told all Prebid companies to submit any other make since after ammendement bidders need to follow approved makes.</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:96px\">449</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Crystal Power</td>\r\n\t\t\t<td style=\"width:92px\">Page 51 Table -2 Eligibility and Qualification Criteria, Average Annual</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">We request you to consider MAAT jointly of the Lead Bidder and the Consortium Partner.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">it is to be met by JV in case JV option taken.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">Turnover</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:101px\">450</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Crystal Power</td>\r\n\t\t\t<td style=\"width:92px\">Page 51 Table -2 Eligibility and Qualification Criteria, Financial</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must demonstrateaccess to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual&nbsp; dvance</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">We request you to consider Financial Resources jointly of the Lead Bidder and the Consortium Partner.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">it is to be met by JV in case JV option taken.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">Resources</td>\r\n\t\t\t<td style=\"width:249px\">payments to meet:</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(i) the following cash-flow requirement: INR 194 Million</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"18\" style=\"height:411px\">451</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:64px\">M/s Crystal Power</td>\r\n\t\t\t<td style=\"width:92px\">Page 51 Table -2 Eligibility and Qualification Criteria, General</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:248px\">We request you to consider manufacturing experience in Electricity meter for past (6) years rather than past (10) years.</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"18\" style=\"width:193px\">All other point will remain unchanged but Availibility of meter manufacturing facilty in India is require for last 10 years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">Experience</td>\r\n\t\t\t<td style=\"width:249px\">following experience criteria in</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">the role of supplier,</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">contractor, Joint Venture&nbsp; partner or management</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">contractor as on the date of</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">opening of bids</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(a) Manufacture and</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">supply of electricity meters</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">for at least the last ten (10) years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(c) Availability of meter</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">repair facility in India since last 3 years</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(d) Availability of inhouse</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">NABL accredited Laboratory</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">(e) Availability of ISO</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">9001:2008 certification or</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">CMMI Level 3 (minimum)</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">certification.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"10\" style=\"height:241px\">452</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:64px\">M/s Crystal Power</td>\r\n\t\t\t<td style=\"width:92px\">Page 51 Table -2 Eligibility and Qualification Criteria, Specific</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder shall have</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:248px\">The Bidder must have successfully manufactured/ supplied, at least 50,000&nbsp; Smart Meters in in the last 7 years, out of which the bidder must have installed and commissioned at least 10,000 Smart Meters under a single project.&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"10\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">Experience</td>\r\n\t\t\t<td style=\"width:249px\">manufactured and supplied at</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">least 11,00,000 static</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">electricity meters (with</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">communication ports) in the</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">last 7 years of which at least</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">300,000 shall be three phase</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Whole Current meters and at</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">least 25,000 shall be LTCT TVM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">or HTCT TVM.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:81px\">453</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Crystal Power</td>\r\n\t\t\t<td style=\"width:92px\">Page 51 Table -2 Eligibility and Qualification Criteria, Specific</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids. These nodes shall be in successful operation for at least one year as on the date of submission of bids. The RF mesh technology should have integrated meters of at least two manufacturers.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Experience of a sub contractor should be considered.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Sub contracting is for point no.4.2.C, JV can be formed max. with 2 partner</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Sub contracting is for point no.4.2.C of table 3, JV can be formed max. with 2 partner</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:21px; width:92px\">Experience</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">454</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">42, ITB 4.1, Section II - Bid Data Sheet</td>\r\n\t\t\t<td style=\"width:249px\">Joint Venture (JV) is allowed. Maximum partners in a JV shall be two (2)</td>\r\n\t\t\t<td style=\"width:248px\">Joint Venture (JV) is allowed. Maximum partners in a JV shall be four (4)</td>\r\n\t\t\t<td style=\"width:183px\">It&rsquo;s a big project with multiple deliverables which comes from different OEMs/ Partners, thus JV of atleast 4 members should be allowed</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">455</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Front Page, Front Page, Front Page</td>\r\n\t\t\t<td style=\"width:249px\">National Open Competitive Procurement</td>\r\n\t\t\t<td style=\"width:248px\">Please confirm, JV can be formed between Indian and International companies</td>\r\n\t\t\t<td style=\"width:183px\">Not much Indian companies qualify the Eligibility Criteria alone. For healthy competition, this should be allowed</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:156px\">456</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">53, 4.1 (B), Technical Qualification Requirement</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter at the time of signing the contract</td>\r\n\t\t\t<td style=\"width:183px\">Requirement of IS 16444 is very new for the Indian market. Only few companies has this license. Many companies are in a process of obtaining this license and hence they should also be allowed to participate in the tender.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:183px\">Assurance in a form of undertaking or BG can be taken if required</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:171px\">457</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:92px\">54, 4.2 a, Technical Qualification Requirement</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 3,00,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">This should be deleted</td>\r\n\t\t\t<td style=\"width:183px\">There are many technology companies which are 13-15 years old and has been doing business in Smart Metering domain since their inception and have decend foot prints globally to qualify the AMR/AMI PQ which more relates to JBVNL AMI Tender requirements</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:20px; width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:183px\">PQ for supply of static electricity meters is a mis-fit in this tender</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">458</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">138, 1.3.2, Communication Infrastructure</td>\r\n\t\t\t<td style=\"width:249px\">The scope includes: Design, Supply, Installation, Testing, and Commissioning of a communication canopy network for seamless data transfer from smart meters. Communication canopy routers/ repeaters/ access points/ gateway/ DCU must have RF Mesh Communication for NAN and 4G (with fall back on 3G/2G) &amp; Ethernet port (MPLS/Optic Fiber) for WAN connectivity.</td>\r\n\t\t\t<td style=\"width:248px\">The scope includes: Design, Supply, Installation, Testing, and Commissioning of a communication canopy network for seamless data transfer from smart meters. Communication canopy routers/ repeaters/ access points/ gateway/ DCU must have RF Mesh Communication for NAN and 4G (with fall back on 3G/2G) or Ethernet port (MPLS/Optic Fiber) for WAN connectivity.</td>\r\n\t\t\t<td style=\"width:183px\">Laying of Optic Fiber for each routers/ repeaters/ access points/ gateway/ DCU is not practically possible when these will be installed over poles or buildings for maximum area coverage</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">459</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">178, 13.c, Load Control Switch</td>\r\n\t\t\t<td style=\"width:249px\">The make of the load switch should be of Gruner / KG Technologies (German) make only and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:248px\">Load Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:183px\">The make of load switch should not be from any brand specific. JBVNL is requested to specify any standard if required.&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">The make of the load switch should be of Gruner / KG Technologies (German) make or Equivalent and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">The make of the load switch should be of Gruner / KG Technologies (German) make or Equivalent and same shall be confirmed by the bidder during tendering. Switch shall be in compliance to IS 15884.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">460</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">635, PCC 8, Time for Commencement and Completion</td>\r\n\t\t\t<td style=\"width:249px\">PCC 8.2 The Time for Completion of the whole of the Facilities shall be 24 months for implementation and 60 months for O&amp;M from the Effective Date as described in the Contract Agreement.</td>\r\n\t\t\t<td style=\"width:248px\">PCC 8.2 The Time for Completion of the whole of the Facilities shall be 24 months for implementation and 120 months for O&amp;M from the Effective Date as described in the Contract Agreement.</td>\r\n\t\t\t<td style=\"width:183px\">Life of a Smart Meter is more than 10 years, hence to get best out of the investment made through this project, the O&amp;M Period of this project should be 10 years, after 24 months of Implementation Period</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">461</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Stelmec Powercom Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">639, PCC 25, Defect Liability</td>\r\n\t\t\t<td style=\"width:249px\">PCC 27.10 The critical components covered under the extended defect liability are Smart Meters along with communication module, DCU along with Power Supply , Collector, NIC, and the period shall be 5 (five) years from the date of operational acceptance.</td>\r\n\t\t\t<td style=\"width:248px\">PCC 27.10 The critical components covered under the extended defect liability are Smart Meters along with communication module, DCU along with Power Supply , Collector, NIC, and the period shall be 10 (ten) years from the date of operational acceptance.</td>\r\n\t\t\t<td style=\"width:183px\">Life of a Smart Meter is more than 10 years, hence to get best out of the investment made through this project, the O&amp;M Period of this project should be 10 years, after 24 months of Implementation Period</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">462</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 3.2, Page no. - 53</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We humbly request tendering authority to kindly relax criteria.</td>\r\n\t\t\t<td style=\"width:183px\">We kindly pray to the Tendering Authority to allow Minimum average annual turnover (MAAT) of INR 90 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:226px\">463</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 4.1, Page no. - 54</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids, (a) Manufacture and supply of electricity meters for at least the last ten (10) years, (b) Availability of IS 16444 certificate for at least one type of electricity meter, (c) Availability of meter repair facility in India since last 3 years, (d) Availability of in-house NABL accredited Laboratory, (e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum) certification.</td>\r\n\t\t\t<td style=\"width:248px\">We request to kindly assist and guide us on key experience criteria on AMI Deployments for such a contract.</td>\r\n\t\t\t<td style=\"width:183px\">We kindly pray to the Tendering Authority to clarify on experience required for Smart Metering Deployment and to add the following credentials:, (f) Engineering, Design Experience for Deployment of RF Canopy of atleast 50% (1.75 Lac Nos.), (g) Installation experience of Smart Energy Meters for atleast 50,000 Nos., (h) Experience of deploying AMI Software Application and providing O&amp;M Support Services for atleast 1 Year for atleast 50% (1.75 Lacs Nos. Smart Meters)</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:196px\">464</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 4.2c, Page no. - 55</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:248px\">As Tendering Authority has requested for Tender for 3.5 Lac Consumers, we pray to relax tender pre-qualification criteria.</td>\r\n\t\t\t<td style=\"width:183px\">We kindly pray to the Tendering Authority to allow successful supply, installation and commissioning of the RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 1,75,000 (50%) Smart Metering nodes in Power Distribution Utility(s) in the last 2 years as on the date of submission of bids.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">465</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 3.2, Page no. - 58</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We humbly request tendering authority to kindly relax criteria.</td>\r\n\t\t\t<td style=\"width:183px\">We kindly pray to the Tendering Authority to allow Minimum average annual turnover (MAAT) of INR 90 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">466</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 4.2a &amp; 4.2b, Page no. - 54</td>\r\n\t\t\t<td style=\"width:249px\">Specific Experience as per Clause 4.2a and Clause 4.2b is Mandatory for Single Entity, Clause 4.2c can be met through Sub-Contractor</td>\r\n\t\t\t<td style=\"width:248px\">We humbly pray to the Tendering Authority, to allow Specific Experience as per Clause 4.2a and Clause 4.2b to be allowed to be met through Sub-Contractor.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:166px\">467</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, 4.2a/ 4.2b/4.2c, Page no. - 54-56 &amp; 59-61</td>\r\n\t\t\t<td style=\"width:249px\">-</td>\r\n\t\t\t<td style=\"width:248px\">We understand that credential certificates are required to be furnished for Specific Experience to establish credibility of the Bidder and their past experience on working on AMI Technology &amp; RF Mesh., However, we humbly seek a clarification on whether Bidder is required to provide the Same Solution as per his experience certificates or may be allowed to offer other solution.</td>\r\n\t\t\t<td style=\"width:183px\">We request to be the following line to be added as:, Bidder must provide AMI Solution as per technology offered on credential certificates.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">468</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause (h) (i), Page no. - 64</td>\r\n\t\t\t<td style=\"width:249px\">In case the bidder bids as a Single bidder, he may appoint subcontractors for providing Communication Services to meet the qualifying criteria specified in clause 4.2 (c).</td>\r\n\t\t\t<td style=\"width:248px\">We kindly pray to the Tendering Authority as In case the bidder bids as a Single bidder, he may appoint subcontractors for providing Communication Services to meet the qualifying criteria specified in clause 4.2(a) and 4.2(b).</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">469</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 4.2.1.1, Page no. - 117</td>\r\n\t\t\t<td style=\"width:249px\">Installation and commissioning of DCU / Gateway / Routers / Access Points or Other Network components for setting up RF Mesh Canopy along with necessary accessories /Hardware for fixing - 3517 Nos.</td>\r\n\t\t\t<td style=\"width:248px\">This figure may drastically change on the basis of Technology provided</td>\r\n\t\t\t<td style=\"width:183px\">We request it be amended to &ldquo;Lump Sum&rdquo; Quantity</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:76px\">470</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 5.1, Page no. - 119</td>\r\n\t\t\t<td style=\"width:249px\">Network Connectivity &ndash; All BOQ Items are 3517 Nos.</td>\r\n\t\t\t<td style=\"width:248px\">This figure may drastically change to say only 75 Nos. on the basis of Technology provided.</td>\r\n\t\t\t<td style=\"width:183px\">We request it be amended to &ldquo;Lump Sum&rdquo; Quantity</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to assess the quantity of DCU/Router/Collector and mention the qty. in price bid. It is written in RFP but deleted in price bid</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">471</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 5.3, Page no. - 120</td>\r\n\t\t\t<td style=\"width:249px\">License Renewal Fee &ndash; Per Year Basis</td>\r\n\t\t\t<td style=\"width:248px\">As perpetual license fee is already paid for, we kindly request for clarification on requirement of the client.</td>\r\n\t\t\t<td style=\"width:183px\">-</td>\r\n\t\t\t<td style=\"width:167px\">ATS of licenses</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">ATS of licenses</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">472</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, Clause 5.6.1, Page no. - 120</td>\r\n\t\t\t<td style=\"width:249px\">Monthly charges of Managed Services for HES/NMS Application on Cloud Provided by Bidder&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We kindly request more information on Managed Services and scope of requirement of client as to this request.</td>\r\n\t\t\t<td style=\"width:183px\">-</td>\r\n\t\t\t<td style=\"width:167px\">Refer MEITY guideliens</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Refer MEITY guideliens</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">473</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, -, Page no. - -</td>\r\n\t\t\t<td style=\"width:249px\">-</td>\r\n\t\t\t<td style=\"width:248px\">In the event of willful damage of Smart Meters, Network Devices etc for which claim is not entertained by Insurance Company, what shall be terms of re-imbursement for new device installations/ providing replacements?</td>\r\n\t\t\t<td style=\"width:183px\">Re-imbursement shall be done as per Rate Contract signed on the Tender Bid.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">474</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, -, Page no. - -</td>\r\n\t\t\t<td style=\"width:249px\">-</td>\r\n\t\t\t<td style=\"width:248px\">Will installation require Meter + Meter Box Installation to be shifted outside the premises of the consumer i.e. on the main wall?</td>\r\n\t\t\t<td style=\"width:183px\">-</td>\r\n\t\t\t<td style=\"width:167px\">This might be possible and bidder are advised to take some %age as meter shifting in their proposal.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">This might be possible and bidder are advised to take some %age as meter shifting in their proposal.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:217px\">475</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, -, Page no.&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">-</td>\r\n\t\t\t<td style=\"width:248px\">Bid document does not specify format for Submission of Guaranteed Technical Particulars of AMI Head End System &amp; AMI RF Canopy</td>\r\n\t\t\t<td style=\"width:183px\">Request to incorporate as:, Bidder is required to Submit Comprehensive Meter Testing Plan with certified performance from Independent Testing Agency/ Customer on communication with HES as per required SLA with Demo Environment (20,000 Meters/ 2,00,000 Meters/ 10,00,000 Meters):, CHECK POINTS, Meter Rating, Program ID, Meter Version, NIC version, Physical Dimensions, Terminal Cover Type, Antenna fixing Arrangement, Display Parameters, Metrological Test &amp; Repeatability, Conformance to, IEEE 802.15.4g, Energy Registers, Demand Registers, TOD Energy Registers, TOD Demand Registers, Midnight Energy Registers, Midnight TOD Energy Registers, Midnight&nbsp; Demand Registers, Midnight&nbsp; TOD Demand Registers, LS Parameters, LS Days, Last DR parameters, TOD of Last DR Energy parameters, XML Files Checking, Update through&nbsp; MPC, Firmware up gradation, Last Gasp First-Breath, Push Alerts, TOD Time Zones, Apparent Calculation, Register Value Checking, LS Value Checking, &nbsp;MD reset, Bill Data Checking, Tamper Tests, Power on Duration Register, Power Off Duration Register, Over Load settings, Over Current settings, MD and DIP checking, SIP Checking, Meter Read and Meter Program convert through Optical Port(Imp-EX &amp; Ex-IMP), MPC(Import-Export), Power Quality data checking, Mapping in HES, Over the Air, Meter Program Configuration, Over the Air, Meter Firmware Upgradation, Over the Air, Meter NIC Firmware Upgradation, Outage / Restoration Alerts and methodology of Outage Alert Management, Latency Seen for the Trigger Messages like ON/OFF commands send to the Endpoints</td>\r\n\t\t\t<td style=\"width:167px\">Pls Rfere RFP</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Pls Refer RFP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:136px\">476</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Federal Synergies (India) Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">RFP Volume - I, 30, Page no. - 242</td>\r\n\t\t\t<td style=\"width:249px\">The bidders shall be required to furnish valid type test reports in respect of 3 phase static energy meter with optical port as per requirement of IS16444:2015 from CPRI or ERDA only.</td>\r\n\t\t\t<td style=\"width:248px\">We understand that as per IS 16444, Meter Manufacturer has to obtain Type Test for each Make &amp; Model of Meter which includes NIC of Particular Technology and Make &amp; Model., Is bidder required to submit the Type Test of the Meter with the NIC on which it is applying for the tender?</td>\r\n\t\t\t<td style=\"width:183px\">We kindly request for amendment as:, The bidders shall be required to furnish valid type test reports in respect of 3 phase static energy meter specifying the NIC (Make, Model &amp; Technology) with optical port as per requirement of IS16444:2015 from CPRI or ERDA only.</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">477</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 137, Clause 1.3.1 viii</td>\r\n\t\t\t<td style=\"width:249px\">Connection/Disconnection of load</td>\r\n\t\t\t<td style=\"width:248px\">How the system should handle consistent communication failure with the node as it is very easy to disrupt RF communication (simply putting a metal lid on the node)</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">If there is&nbsp; communication failure, meter connect/disconnect command can&#39;t be executed. Bidder to ensure communication as per SLA&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">If there is&nbsp; communication failure, meter connect/disconnect command can&#39;t be executed. Bidder to ensure communication as per SLA&nbsp;&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">478</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 138, Clause 1.3.2</td>\r\n\t\t\t<td style=\"width:249px\">MPLS/Fiber connectivity for DCU</td>\r\n\t\t\t<td style=\"width:248px\">Do you expect MPLS/Fiber modem to be part of DCU installation?&nbsp; Such an installation will need cables running on lamp posts which may cause repeated disruptions in communication</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bidder need to extend connectivity to backbone PoP</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder need to extend connectivity to backbone PoP</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">479</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 141, Clause 1.3.3.1</td>\r\n\t\t\t<td style=\"width:249px\">IPv6 compatible mesh network</td>\r\n\t\t\t<td style=\"width:248px\">6LoWPAN networks use edge routers to communicate to nodes on an IPv6 network.&nbsp; That means each and every node is accessible from network.&nbsp; Why a store and forward DCU is proposed in the requirement?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">DCU&#39;s are not supposed to store any data. Mesh should be ipv6 with backward compatibility on ipV4</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">DCU&#39;s are not supposed to store any data. Mesh should be ipv6 with backward compatibility on ipV4</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">480</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg.&nbsp; 142, Clause 1.3.3.1 8</td>\r\n\t\t\t<td style=\"width:249px\">The solution must facilitate recording of, o No of packet failures, o Retry attempts, o Missed periodic reading, o Failure to connect, o Network topology, o Latency</td>\r\n\t\t\t<td style=\"width:248px\">Are these parameter pertaining to uplink or of mesh network., As 6LoWPAN is defined for lossy RF networks, packet loss is inherent to the system. By monitoring the packet losses one can no way characterize or diagnose a system as these losses or dynamic in nature.&nbsp; These requirements unnecessarily load the system.&nbsp; Please clarify.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">System should have diagnostic tools/feature for testing network performance. However deployed system need to meet desired network performance parameters.&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">System should have diagnostic tools/feature for testing network performance. However deployed system need to meet desired network performance parameters.&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">481</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 145</td>\r\n\t\t\t<td style=\"width:249px\">Communication specification</td>\r\n\t\t\t<td style=\"width:248px\">How the compliance of the NIC/DCU to the RFCs mentioned in the requirement is ensured.&nbsp; As of now there is no certifying body exists for these.&nbsp; Various implementations in the country are not compatible with each other</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Agreed</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Agreed</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">481</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 146</td>\r\n\t\t\t<td style=\"width:249px\">System Management features, Time Sync with NTP</td>\r\n\t\t\t<td style=\"width:248px\">Do you expect DCU to have internet connectivity to sync with a public NTP server or sync with cellular network time is OK?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">DCU&#39;s are not supposed to have internet connectivity</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">DCU&#39;s are not supposed to have internet connectivity</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">482</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 147</td>\r\n\t\t\t<td style=\"width:249px\">IP requirement</td>\r\n\t\t\t<td style=\"width:248px\">Conflicts with requirement on Pg. 142.&nbsp; What is the minimum IP acceptable IP65 or IP67?</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">IP 65</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">IP 65</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">483</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 147</td>\r\n\t\t\t<td style=\"width:249px\">Electrical specification for NIC card</td>\r\n\t\t\t<td style=\"width:248px\">IS16444 doesn&rsquo;t specify the voltage requirement.&nbsp; If you are looking for a specific voltage and interchangeable plug-in NIC cards, please specify the physical (size, shape, inter-connection) and electrical characteristics (connections from the meter and signal description) of the NIC interface with the meter.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bidder to arrange for the details from Smart meter OEM as per Tender T&amp;C&nbsp;</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bidder to arrange for the details from Smart meter OEM as per Tender T&amp;C&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">484</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 178, Cl. 6.0</td>\r\n\t\t\t<td style=\"width:249px\">14. Performance requirement for load switching, Utilization category of the load switch Shall comply IS 15884</td>\r\n\t\t\t<td style=\"width:248px\">We understand that utilization category to be considered as UC1 as it is the minimum requirement as per Standards., Kindly confirm.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">UC2 or better for 1 Ph &amp; 3 Ph WC Smart Energy meter</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">UC 1 for 1 Ph meters and UC2 for 10-60A 3PH WCM</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">485</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 192, Cl. 9.0</td>\r\n\t\t\t<td style=\"width:249px\">7. Push Button, Meter with push button for manual display shall not be acceptable.</td>\r\n\t\t\t<td style=\"width:248px\">We understand that display parameters should not be displayed / scrolled using push button. However, push button may be available on the meter., Kindly confirm</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Push button to be provided for manual display</td>\r\n\t\t\t<td style=\"width:83px\">Amendment</td>\r\n\t\t\t<td style=\"width:193px\">Push button to be provided for manual display</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:121px\">486</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 196, Cl. 13.0</td>\r\n\t\t\t<td style=\"width:249px\">C. Following tests shall also be carried out as Acceptance tests by adopting methods specified in ISS:13779/IS:9000/IS16444/IS15959/ relevant IEC standard / CBIP 325 (latest amended) on Automatic meter test bench with electronic reference sub- standard of preferably 0.02 class accuracy or better.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We request you to accept reference meter sub-standard of 0.05 class accuracy as the reference meter class of accuracy shall be 1/10th of the meter under test. In this project all the meter types are Class 1.0 or Class 0.5S so reference meter of Class 0.05 is sufficient., Kindly accept.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:91px\">487</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg. 205, Cl. 1.6.3</td>\r\n\t\t\t<td style=\"width:249px\">Meter Box Specifications, 1.&nbsp;c) The thickness of the box shall not be less than 3.0 mm on the load bearing side and other sides, door and roof shall not be less than 2.5 mm.</td>\r\n\t\t\t<td style=\"width:248px\">We request you to accept the thickness of Meter box on the load bearing side 3.0&plusmn;0.2mm and other sides, door &amp; roof and Box top cover 2.0&plusmn;0.2mm as the load bearing side requires more thickness than on other planes. The thickness of 2.0&plusmn;0.2mm is sufficient for all other planes., Kindly accept.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:106px\">488</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg.54, 4.1 (b), General Experience</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture:, (b).Availability of IS 16444 certificate for at least one type of electricity meter.</td>\r\n\t\t\t<td style=\"width:248px\">As our product is under type testing, it requires another 3 months time for obtaining IS: 16444.Therefore, we humbly request you to accept IS: 16444 certificate will be submitted before commencement of supplies., Kindly accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:181px\">489</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg.55, (b), Specific Experience&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system.&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We request you to kindly accept,as the AMI has never been implemented.Hence, we request you to kindly accept for 36000 Nos., Kindly accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must haveexecuted (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px\">490</td>\r\n\t\t\t<td style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td style=\"width:64px\">M/s Visiontek</td>\r\n\t\t\t<td style=\"width:92px\">Pg.55, (c), Specific Experience</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh.</td>\r\n\t\t\t<td style=\"width:248px\">We request you kindly accept the supply as such large numbers no where it is implemented., Kindly accept the same.</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td style=\"width:83px\">Clarification</td>\r\n\t\t\t<td style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px\">491</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Average Annual Turnover</td>\r\n\t\t\t<td style=\"width:249px\">Minimum average annual turnover (MAAT) of INR 1943 Million in last three (03) financial years ending 31st March 2018.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Must meet at least 30% of the requirement (To be removed)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">Justification being a new technology feasibility to have such huge turn over by each partner would be difficult hence request for this clause to be removed.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px\">492</td>\r\n\t\t\t<td style=\"width:92px\">Page No.53, Table 2, Point No3, Clause 3.2</td>\r\n\t\t\t<td style=\"width:249px\">, Each Partner, Must meet at least 30% of the requirement</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:121px\">493</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Financial Resources</td>\r\n\t\t\t<td style=\"width:249px\">The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet:</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Must meet at least 30% of the requirement (to be removed)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">It would be too difficult for each partners such as technology, SI and manufacturer all of them to meet this qualifying criteria in a new technology as well in a start up environment. So it can be specified as anyone partner instead of all partners</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Page No.53, Table 2, Point No3, Clause 3.3</td>\r\n\t\t\t<td style=\"width:249px\">, Must meet at least 30% of the requirement</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">494</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Financial Resources</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">(i) the following cash-flow requirement: INR 194 Million</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Must meet at least 30% of the requirement (to be removed)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">It would be too difficult for each partners such as technology, SI and manufacturer all of them to meet this qualifying criteria in a new technology as well in a start up environment. So it can be specified as anyone partner instead of all partners</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions and subsequent amendment</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Page No.53, Table 2, Point No3, Clause 3.3</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">495</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Net Worth of Bidder</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">Net Worth for average of the last three Financial Years should be positive. Net worth means the sum total of the paid up capital and free reserves (excluding reserves created out of revaluation) reduced by aggregate value of accumulated loses (including debit balance in profit and loss account for current year) and intangible assets.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Must meet requirement (To be removed and specified as anyone partner)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">It would be too difficult for each partners such as technology, SI and manufacturer all of them to meet this qualifying criteria in a new technology as well in a start up environment. So it can be specified as anyone partner instead of all partners</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Page No.53, Table 2, Point No3, Clause 3.4</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"7\" style=\"height:496px\">496</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:92px\">General Experience (Tender Page No.53,&nbsp; section 3, Table 2, Point No 4, Clause 4.1 to be given)</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td style=\"width:248px\">4.2 a) The bidder or its partners must meet the following experience criteria in the role of supplier, contractor, Joint Venture partner or management contractor as on the date of opening of bids</td>\r\n\t\t\t<td style=\"width:183px\">Request for addendum stating Bidders or its partners (marked in RED font)</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"7\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:75px; width:249px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years</td>\r\n\t\t\t<td style=\"width:248px\">(a) Manufacture and supply of electricity meters for at least the last ten (10) years should be having an existing order of more than 2 Lakh smart meters</td>\r\n\t\t\t<td style=\"width:183px\">Clause A to be replaced with should be having an existing order of more than 2 lakh smart meters</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:249px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t\t<td style=\"width:248px\">(b) Availability of IS 16444 certificate for at least one type of electricity meter</td>\r\n\t\t\t<td style=\"width:183px\">F) new point F addition suggested</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:120px; width:249px\">(c) Availability of meter repair facility in India since last 3 years</td>\r\n\t\t\t<td style=\"width:248px\">(c) Availability of meter repair facility in India since last 3 years</td>\r\n\t\t\t<td style=\"width:183px\">, Justification for clause A Manufacturing experience of Conventional meters fro last 10 years would be irrelevant to the tender since conventional meter experience cannot be taken granted for AMI smart meters hence request addendum for this clause</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:30px; width:249px\">(d) Availability of in-house NABL accredited Laboratory</td>\r\n\t\t\t<td style=\"width:248px\">(d) Availability of in-house NABL accredited Laboratory</td>\r\n\t\t\t<td style=\"width:183px\">b) IS 164444 certificate will be provided by end of februrary 2019.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:249px\">(e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum) certification.</td>\r\n\t\t\t<td style=\"width:248px\">(e) Availability of ISO 9001:2008 certification or CMMI Level 3 (minimum) certification.</td>\r\n\t\t\t<td style=\"width:183px\">Point F addition suggested EESL mysore &amp; other project there had been challenges since if an end to end solution if npt provided by a single partner this lead to lot of coordination issues.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">F) Point to be added-meters RF mesh network &amp; HES should come from a single partner&nbsp;</td>\r\n\t\t\t<td style=\"width:183px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">497</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Specific Experience</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The Bidder shall have manufactured and supplied at least 11,00,000 static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be three phase Whole Current meters and at least 25,000 shall be LTCT TVM or HTCT TVM.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">The Bidder or its partners shall have manufactured and supplied at least 11,00,000 (to be replaced with 5 lakhs) static electricity meters (with communication ports) in the last 7 years of which at least 300,000 shall be single phase or three phase (Whole Current meters to be deleted) (and at least 25,000 shall be LTCT TVM or HTCT TVM -to be deleted)</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Page No. 54, Section 3, Table 2, Point No.4.2a.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:76px\">498</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Specific Experience</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:249px\">The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years, out of which the bidder must have installed and commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">4.2 b) to be replaced with clause sucessfully completed one project end to end solutions which should include Smart Meters fitted with RF mesh nodes built in, HES, MDM, &amp; succesfully integrated to billing applications Request for replacement with condition, Since the tender is for AMI, it makes more relevance to AMI technology.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must have installed or commissioned at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">4.2(b) The Bidder must have successfully manufactured/ supplied, at least 180,000 AMR or AMI meters in Power Distribution Utility(s) in the last 7 years. The bidder must haveexecuted (including installation and commissioning) at least 36,000 meters as part of an AMI/AMR system. The scope of any one of the above contracts shall include installation of MDAS or HES application.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:92px\">Page No. 54, Section 3, Table 2, Point No.4.2a.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:181px\">499</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Adya Metering Hyderabad</td>\r\n\t\t\t<td style=\"width:92px\">Specific Experience</td>\r\n\t\t\t<td style=\"width:249px\">The bidder must have successfully supplied, installed and commissioned RF Mesh infrastructure conforming to IPV4/IPV6 communication protocol (including NIC and Network Components along with respective Software i.e. HES, NMS) for at least 3,62,000 Smart Metering nodes in Power Distribution Utility(s) in the last 7 years as on the date of submission of bids</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:248px\">4.2 b) to be replaced with clause sucessfully completed one project end to end solutions which should include Smart Meters fitted with RF mesh nodes built in, HES, MDM, &amp; succesfully integrated to billing applications Request for replacement with condition, Since the tender is for AMI, it makes more relevance to AMI technology.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:45px; width:92px\">Page No. 54, Section 3, Table 2, Point No.4.2a.</td>\r\n\t\t\t<td style=\"width:249px\">These nodes shall be in successful operation for at least one year as on the date of submission of bids.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">The RF mesh technology should have integrated meters of at least two manufacturers</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:51px\">500</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Anvil Cables Pvt. Ltd.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">ITB 4.1</td>\r\n\t\t\t<td style=\"width:249px\">ITB 4.1</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:248px\">Please allow minimum 3 partners.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:31px; width:249px\">Joint Venture (JV) is allowed. Maximum partners in a JV shall be two (2).&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:91px\">501</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:64px\">M/s Anvil Cables Pvt. Ltd.</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:92px\">Page 172&nbsp; Clause 5.0 General Technical Requirement .</td>\r\n\t\t\t<td style=\"width:249px\">Page 172&nbsp; Clause 5.0 General Technical Requirement . S. No. 4 Rated Current Base Current (Ib) &ndash; 5 Amps</td>\r\n\t\t\t<td style=\"width:248px\">We request you to kindly change the base current (Ib) requirement to 10 Amps</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:167px\">Agreed, Pls consider 5-30 as 10-60 AMP</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:83px\">Amendment</td>\r\n\t\t\t<td rowspan=\"2\" style=\"width:193px\">1Ph Smart meter current rating as 5-30A</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:46px; width:249px\">Maximum Current (Imax) - 30 Amps</td>\r\n\t\t\t<td style=\"width:248px\">and Maximum current (Imax) to 60 Amps as 5(30)A is a subset of 10(60)A&nbsp; and will provide application for wide current range&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:271px\">502</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">09-Jan-19</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:64px\">M/s Anvil Cables Pvt. Ltd.</td>\r\n\t\t\t<td style=\"width:92px\">Page 179&nbsp; Clause 5.0 General Technical Requirement&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Page 179&nbsp; Clause 5.0 General Technical Requirement&nbsp;&nbsp;&nbsp;</td>\r\n\t\t\t<td style=\"width:248px\">We propose that cellular technology to be used as the existing countrywide cellular network can be used. There is no need to develop separate network as in RF technology. Moreover in RF Canopy structure,inter-operability of the meter is limited to the technology used by Network provider.</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:183px\">&nbsp;</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:167px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:83px\">Clarification</td>\r\n\t\t\t<td rowspan=\"3\" style=\"width:193px\">Bid will be evaluated as per existing Clause/Terms/Conditions</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:90px; width:92px\">S. No. 15&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">S. No. 15 Communication module of meter for AMI</td>\r\n\t\t\t<td style=\"width:248px\">There is more risk of loosing technical support from RF Network provider over the project period and beyond,than compared to&nbsp; support from GSM/GPRS technology provider like Vodafone/BSNL.</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:61px; width:92px\">&nbsp;</td>\r\n\t\t\t<td style=\"width:249px\">Sub Clause c) mentioned in IS 16444 Part-1. This module should be able to connect NAN or WAN (as per the plugged module RF or GSM) for two-way communication. Either of these will be used.</td>\r\n\t\t\t<td style=\"width:248px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t</tbody>\r\n</table>\r\n\r\n<p>E-Procurement Notice</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>National Open Competitive Procurement</strong></p>\r\n\r\n<p><strong>(Two-Envelope Bidding Process with e-Procurement)</strong></p>\r\n\r\n<p><strong>Design, Supply and Installation of Plant</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Employer</strong>: <em>JHARKHAND BIJLI VITRAN NIGAM LIMITED (JBVNL)</em></p>\r\n\r\n<p><strong>Contract title</strong>: <em>Engineering, Design, Supply, Installation and O&amp;M Support for 60 months of AMI System including AMI Software Applications, RF Canopy &amp; Smart Meters for 3.5 Lakh (approx.) Consumers in Ranchi District of JBVNL, Jharkhand (INDIA)</em></p>\r\n\r\n<p><strong>Loan No. /Credit No.:</strong><em> IBRD-89080-IN </em></p>\r\n\r\n<p><strong>RFB No: </strong><em>197 / PR / JBVNL/ 2018-19</em></p>\r\n\r\n<p><strong>Issued on: </strong><em>19.12.2018</em></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li>The Jharkhand Bijli Vitran Nigam Limited (JBVNL) has <em>received </em>financing from the World Bank toward the cost of the <em>Jharkhand Power System Improvement Project </em>and intends to apply part of the proceeds toward payments under the contract for <em>Engineering, Design, Supply, Installation and O&amp;M Support for 60 months of AMI System including AMI Software Applications, RF Canopy &amp; Smart Meters for 3.5 Lakh (approx.) Consumers in Ranchi District of JBVNL, Jharkhand (INDIA)</em>.</li>\r\n\t<li>The <em>JBVNL</em> now invites online Bids from eligible Bidders for <em>Engineering, Design, Supply, Installation and O&amp;M Support for 60 months of AMI System including AMI Software Applications, RF Canopy &amp; Smart Meters for 3.5 Lakh (approx.) Consumers&nbsp; in Ranchi District of JBVNL, Jharkhand (INDIA) </em>shown in Table below. Bidders are advised to note the clauses on eligibility (Section I Clause 4) and minimum qualification criteria (Section III &ndash; Evaluation and Qualification Criteria), to qualify for the award of the contract. In addition, please refer to paragraphs 3.14 and 3.15 of the &ldquo;Procurement Regulations&rdquo; setting forth the World Bank&rsquo;s policy on conflict of interest.</li>\r\n\t<li>Bidding will be conducted through national competitive procurement using a Request for Bids (RFB) as specified in the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers, July 2016, Revised November 2017 and August 2018&rdquo; (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Bidders as defined in the Procurement Regulations.</li>\r\n\t<li>The bidding document is available online on <strong>https://jharkhandtenders.gov.in/</strong> from 25.12.2018 TO 09.02.2019 free of cost for the interested bidder. Bidders will be required to register on the website, which is also free of cost. The bidders would be responsible for ensuring that any addenda available on the website is also downloaded and incorporated.</li>\r\n\t<li>For submission of the bid, the bidder is required to have Digital Signature Certificate (DSC) from one of the Certifying Authorities authorized by Government of India for issuing DSC. (Bidders can see the list of licensed CA&rsquo;s from the link www.cca.gov.in). Aspiring bidders who have not obtained the user ID and password for participating in e-procurement in this Project, may obtain the same from the website: <u>https://jharkhandtenders.gov.in</u>.</li>\r\n\t<li>Bids must be submitted online on <u>https://jharkhandtenders.gov.in</u> on or before 15:00 hours on 09.02.2019 and the &lsquo;Technical Part&rsquo; of the bids will be opened online on the 09.02.2019 at 16:00 hours. The &ldquo;Financial Part&rdquo; shall remain unopened in the e-procurement system until the second public Bid opening for the financial part. Any bid or modifications to bid (including discount) received outside e-procurement system will not be considered. If the office happens to be closed on the date of opening of the bids as specified, the bids will be opened on the next working day at the same time. The electronic bidding system would not allow any late submission of bids.</li>\r\n\t<li>All Bids must be accompanied by a bid security of the amount specified for the contract in the table below, drawn in favour of Jharkhand Bijli Vitran Nigam Limited (JBVNL). Bid security will have to be in any one of the forms as specified in the bidding document and shall have to be valid for 45 days beyond the validity of the bid. Procedure for submission of bid security is described in Para 9.</li>\r\n\t<li>The bidders are required to submit (a) original cashier&rsquo;s cheque, demand draft towards the cost of bid document (if any) and (b) original bid security in approved form with Nationalized/ Scheduled Commercial Bank of India in favour of JBVNL payable at Ranchi or Bank Guarantee of any Nationalized/ Scheduled Commercial Bank of India in favour of JBVNL at the address mentioned below at point.14, before the submission&nbsp; of the technical part of the Bid i.e. 09.02.2019 up to 15:00 HRS either by registered post/speed post/courier or by hand, failing which the bids will be declared nonresponsive and will not be opened.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\r\n\t<li>A pre-bid meeting will be held on 07.01.2019 at 12:00 hrs. At the office of JBVNL, Ranchi to clarify the issues and to answer questions on any matter that may be raised at that stage as stated in ITB Clause 7.4 of &lsquo;Instructions to Bidders&rsquo; of the bidding document. Bidders are advised to download the bidding document prior to the pre-bid meeting in order for bidders to have a good understanding of the scope of the requirements under this contract for discussion and clarification at the pre-bid meeting.</li>\r\n\t<li>Other details can be seen in the bidding documents. The Employer shall not be held liable for any delays due to system failure beyond its control. Even though the system will attempt to notify the bidders of any bid updates, the Employer shall not be liable for any information not received by the bidder. It is the bidders&rsquo; responsibility to verify the website for the latest information related to this bid.</li>\r\n\t<li>Details of the Plants requirements (<em>including facilities, location, delivery period, </em>etc.) are shown in the table below:</li>\r\n</ol>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<table border=\"1\" cellpadding=\"0\" cellspacing=\"0\" style=\"width:100.0%\">\r\n\t<tbody>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:15.68%\">\r\n\t\t\t<p><strong>Contract No</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:40.18%\">\r\n\t\t\t<p><strong>Contract Title</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:14.94%\">\r\n\t\t\t<p><strong>Bid Security</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.7%\">\r\n\t\t\t<p><strong>Cost of Document</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:15.5%\">\r\n\t\t\t<p><strong>Period of Completion</strong></p>\r\n\t\t\t</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:15.68%\">\r\n\t\t\t<p><strong>1</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:40.18%\">\r\n\t\t\t<p><strong>2</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:14.94%\">\r\n\t\t\t<p><strong>3</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.7%\">\r\n\t\t\t<p><strong>4</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:15.5%\">\r\n\t\t\t<p><strong>5</strong></p>\r\n\t\t\t</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:15.68%\">\r\n\t\t\t<p><strong>197 / PR / JBVNL/ 2018-19</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:40.18%\">\r\n\t\t\t<p><strong>Engineering, Design, Supply, Installation and O&amp;M Support for 60 months of AMI System including AMI Software Applications, RF Canopy &amp; Smart Meters for 3.5 Lakh (approx.) Consumers in Ranchi District of JBVNL, Jharkhand (INDIA</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:14.94%\">\r\n\t\t\t<p><strong>INR 24.3 Million</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.7%\">\r\n\t\t\t<p><strong>INR 0.00</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:15.5%\">\r\n\t\t\t<p><strong>O&amp;M support for 60 months for each Phase&nbsp; after completion </strong></p>\r\n\t\t\t</td>\r\n\t\t</tr>\r\n\t</tbody>\r\n</table>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li>Implementation of Smart meters in all 06 divisions under project area will be divided in 04 phases. The indicative quantity of phase wise meters installation is mentioned in following table.</li>\r\n</ol>\r\n\r\n<p>Table 1 - Phase wise bifurcation of meters</p>\r\n\r\n<table border=\"0\" cellpadding=\"0\" cellspacing=\"0\" style=\"width:102%\">\r\n\t<tbody>\r\n\t\t<tr>\r\n\t\t\t<td colspan=\"11\" style=\"height:1px; width:100.0%\">\r\n\t\t\t<p><strong>ACTIVE CONSUMERS OF RANCHI DISTRICT FOR SMART METERING/AMI</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:10.8%\">\r\n\t\t\t<p><strong>Rollout Phase (qty)</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:13.98%\">\r\n\t\t\t<p><strong>Division</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:8.24%\">\r\n\t\t\t<p><strong>Division wise qty</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:10.26%\">\r\n\t\t\t<p><strong>Sub-Division</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:7.18%\">\r\n\t\t\t<p><strong>LT CT</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:6.74%\">\r\n\t\t\t<p><strong>3-Phase</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:8.78%\">\r\n\t\t\t<p><strong>1-Phase</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:9.6%\">\r\n\t\t\t<p><strong>HT Consumer</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:9.6%\">\r\n\t\t\t<p><strong>DT Consumer</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:6.8%\">\r\n\t\t\t<p><strong>Feeder </strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:26px; width:8.02%\">\r\n\t\t\t<p><strong>Grand Total</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:26px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:26px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"5\" style=\"height:1px; width:10.8%\">\r\n\t\t\t<p>Phase-1 (108511)</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Central</p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"3\" style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>54683</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Ashok Nagar</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>37</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>944</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>16863</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>8</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>288</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>8</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>18148</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Central</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Harmu</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>21</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>523</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>14851</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>2</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>282</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>7</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>15686</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Central</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Main Road</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>147</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>1380</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>18910</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>45</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>357</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>10</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>20849</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi New Capital</p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>53828</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>kanke</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>23</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>323</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>29272</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>17</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>231</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>10</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>29876</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi New Capital</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Upper bazar</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>145</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>2440</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>20711</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>52</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>593</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>11</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>23952</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"4\" style=\"height:1px; width:10.8%\">\r\n\t\t\t<p>Phase-2 (97453)</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Doranda</p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"3\" style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>66110</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Doranda</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>53</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>815</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>22217</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>50</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>421</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>12</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>23568</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Doranda</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>HEC</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>31</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>196</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>20419</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>27</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>220</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>19</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>20912</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Doranda</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Tupudana</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>88</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>447</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>20688</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>40</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>359</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>8</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>21630</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi West</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>31343</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Ratu Road</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>90</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>1057</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>29673</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>14</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>501</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>8</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>31343</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"2\" style=\"height:1px; width:10.8%\">\r\n\t\t\t<p>Phase-3 (68243)</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi East</p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"2\" style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>68243</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Ormanjhi</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>536</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>462</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>25583</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>43</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>366</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>15</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>27005</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi East</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Tati silwai</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>86</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>354</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>40619</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>48</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>122</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>9</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>41238</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td rowspan=\"3\" style=\"height:1px; width:10.8%\">\r\n\t\t\t<p>Phase-4 (77503)</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Kokar</p>\r\n\t\t\t</td>\r\n\t\t\t<td rowspan=\"3\" style=\"height:1px; width:8.24%\">\r\n\t\t\t<p>77503</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Kokar</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>107</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>984</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>25653</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>49</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>460</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>17</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>27270</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Kokar</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>Lalpur</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>83</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>1386</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>20897</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>27</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>419</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>2</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>22814</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p>Ranchi Kokar</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>RMCH</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p>57</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p>1964</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p>24650</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>36</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p>697</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p>15</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p>27419</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t\t<tr>\r\n\t\t\t<td style=\"height:1px; width:10.8%\">\r\n\t\t\t<p>&nbsp;</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:13.98%\">\r\n\t\t\t<p><strong>Grand Total</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.24%\">\r\n\t\t\t<p><strong>351710</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:10.26%\">\r\n\t\t\t<p>&nbsp;</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:7.18%\">\r\n\t\t\t<p><strong>1504</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.74%\">\r\n\t\t\t<p><strong>13275</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.78%\">\r\n\t\t\t<p><strong>331006</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p><strong>458</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:9.6%\">\r\n\t\t\t<p><strong>5316</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:6.8%\">\r\n\t\t\t<p><strong>151</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px; width:8.02%\">\r\n\t\t\t<p><strong>351710</strong></p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"height:1px\">&nbsp;</td>\r\n\t\t</tr>\r\n\t</tbody>\r\n</table>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li>The address referred to above is:</li>\r\n</ol>\r\n\r\n<p><strong>Mr. Sanjay Kumar, GM (IT)</strong></p>\r\n\r\n<p><strong>Jharkhand Bijli Vitran Nigam Limited (JBVNL), </strong></p>\r\n\r\n<p><strong>Engineering Building, HEC, Dhurwa, </strong></p>\r\n\r\n<p><strong>Ranchi-834004, Jharkhand, India</strong></p>\r\n\r\n<p><strong>Tel: +91-651-2400826</strong></p>\r\n\r\n<p><strong>Fax: +91-651-2400799</strong></p>\r\n\r\n<p><strong>E-mail: piujbvnl@gmail.com &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\r\n\r\n<p><strong>www.jbvnl.co.in</strong></p>\r\n\r\n<p>&nbsp;</p>"},{"id":"OP00060754","notice_type":"Invitation for Bids","noticedate":"31-Oct-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2018-11-22T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"India","project_id":"P157198","project_name":"Assam State Public Finance Institutional Reforms (ASPIRe) Project","bid_reference_no":"IN-AS-CFMS-64741-GO-RFB","bid_description":"System Integrator for Excise e-Governance Solution","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"Assam Society for Comprehensive Financial Management System,\r\nGuwahati,\r\nAssam","contact_ctry_name":"India","contact_email":"tamojyoti.bose@gmail.com","contact_name":"Tamojyoti Bose","contact_organization":"Assam Society for Comprehensive Financial Management System","contact_phone_no":"9954030309","submission_date":"2018-10-31T00:00:00Z","notice_text":"<p>Invitation for Bids (IFB)</p><p>Issuing date of the IFB: September 7, 2018</p><p>Country: India Project:</p><p>Assam State Public Finance Institutional Reforms (ASPIRe) Project</p><p>Brief Description of the Procurement Activity: Design, Development, Supply, Commissioning, Implementation and Maintenance of an e-Governance Application for Commissionerate of Excise in Assam.</p><p>Loan Number: 8765-IN</p><p>IFB Number: IN-AS-CFMS-64741-GO-RFB&nbsp;&nbsp;<br />&nbsp;<br />1. This Invitation for Bids (IFB) follows the General Procurement Notice (GPN) for this project that appeared in UNDB online on Monday April 16, 2018.</p><p>2. The Government of India has received a loan from the International Bank for Reconstruction and Development International Development Association toward the cost of the project and it intends to apply part of the proceeds of this loan to payments under the agreement(s) resulting from this IFB vide IFB Title &amp; Number.</p><p>3. The Department of Excise (DoE) serves as the implementing agency for the project and now invites bids from eligible Bidders for Design, Develop, Supply, Commission, Implement and Maintain e-Governance Application for Commissioner of Excise in Assam, spread over 6 years (One year of design, development and implementation and five years of Operations and Maintenance.</p><p>4. Bidding will be conducted using the National Competitive Bidding (NCB) procedures specified in the World Bank&rsquo;s Guidelines: Procurement under IBRD Loans and IDA Credits, edition of January 2011, Revised July 2014, and is open to all Bidders eligible as defined in these Guidelines, that meet the following minimum qualification criteria as mentioned in BDS entry for ITB Clause 6.1 (a).</p><p>5. Interested eligible Bidders may obtain further information from Commissionerate of Excise, Dispur, Guwahati, Assam and inspect the bidding documents at the address given below from 1100 Hrs. to 1700 Hrs. A pre-bid meeting which potential bidders may attend will be held on as per time and venue mentioned in BDS under ITB 10.2</p><p>6. A complete set of bidding documents in English may be downloaded from https://assamtenders.gov.in.&nbsp; At the same web site, bidders may register for the bidding.&nbsp;<br />6.1. Accessing/ purchasing of bid documents&nbsp; &nbsp;<br />(a) To participate in e-tendering of DoE, it is mandatory for the Bidders to have ClassIII Digital Signature Certificate (DSC) (with both signing and encryption certificate) from any of the licensed Certifying Agency and get themselves registered on eProcurement portal (https://assamtenders.gov.in). Digital Signature Certificates of only the Authorized Signatory of the Bidding firm will be allowed.&nbsp;<br />Invitation for Bids. The Digital signature certificate should be in the name of the person or the Authorized Signatory holding Power of Attorney who will sign the Bid. In case the Authorized Signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-responsive&nbsp; &nbsp;<br />(b) To participate in the e-bidding, it is mandatory for the invited bidders to get themselves registered with the Procurement Portal (https://assamtenders.gov.in) to have a user ID &amp; Password which has to be obtained by submitting non-refundable annual registration charges. Details can be obtained from the above mentioned portal.&nbsp;<br />6.2. To participate in Bidding&nbsp;<br />(a) Deleted&nbsp;<br />(b) The bidders will be allowed to download the bid documents till Thursday, November 22, 2018, 1400 Hrs.&nbsp;</p><p>7. Bids must be submitted online at or before the time and date specified at ITB 21.1 (Thursday, November 22, 2018, 1400 Hrs). The electronic bidding system would not allow any late submission of bids after the due date &amp; time as per server time. Technical bids will be opened online as per the date and time defined at ITB 24.1 (Thursday, November 22, 2018, 1430 Hrs). In the event of the specified date for the opening of bids being declared a holiday for the Purchaser, the bids will be opened at the appointed time on the next working day.</p><p>8. The bid must be accompanied by a bid security of an amount as mentioned in ITB 17.1 in INR. Securing the bids shall be substantially in accordance with the related sample forms included in Section VII or other forms approved by the Purchaser prior to bid submission. Bids must remain secured for a period of 120 days beyond the validity period of the bids. Bids will be opened in the presence of Bidders&rsquo; representatives who choose to attend at the address below at ITB 24.1&nbsp;</p><p>9. The attention of prospective Bidders is drawn to&nbsp; (i) the fact that they will be required to certify in their bids that all software is either covered by a valid license or was produced by the Bidder and&nbsp; (ii) that violations are considered fraud, which can result in ineligibility to be awarded World Bank-financed contracts.</p><p>10. The Purchaser shall not be held liable for any delays due to system failure beyond its control. Even though the system will attempt to notify the bidders of any bid updates, the Purchaser shall not be liable for any information not received by the bidder. It is the bidders&rsquo; responsibility to verify the website for the latest information related to the e-Procurement.&nbsp;</p><p>11. The bidders are required to submit&nbsp;<br />(a) Original bid security in approved form and the letter of Power of Attorney should be submitted to the ASPIRe Project Office, Ground Floor, F Block, Assam Secretariat, Dispur, Guwahati-781006 in sealed cover on or before the last date mentioned in ITB 21 either by registered post or by hand, failing which the bids shall be declared non-responsive.&nbsp; &nbsp;&nbsp;<br />(b) The number mentioned on acknowledgement of online submission of the bid by the bidder shall be mentioned on envelope containing the documents as detailed above.&nbsp;</p>"},{"id":"OP00053867","notice_type":"Request for Expression of Interest","noticedate":"06-Jun-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2018-07-05T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Lao People's Democratic Republic","project_id":"P160930","project_name":"Lao PDR Southeast Asia Disaster Risk Management Project","bid_reference_no":"C2/C007","bid_description":"System Integrator (hereafter the Consultant Firm) is aimed to work for the provision of comprehensive assistance and services to DMH for the modernization and integration of their operations to harmonize and improve the quality of their products services","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Souphanouvong Avenue, Ban Akat, Sikhothabong District, Vientiane Capital","contact_ctry_name":"Lao People's Democratic Republic","contact_email":"vxmanivong.dmh@gmail.com","contact_name":"Viengxai Manivong","contact_organization":"Ministry of Natural Resource and Environment, Department of Meteorology and Hydrology","contact_phone_no":"856 20 54744333","contact_web_url":"www.dmh.gov.la","submission_date":"2018-06-06T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\r\n\r\n<p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Department of Meteorology and Hydrology (DMH) </strong></p>\r\n\r\n<p><strong>&nbsp;Ministry of Natural Resources and Environment (MONRE)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong><em>Lao PDR Southeast Asia Disaster Risk Management Project</em></strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Assignment Title: Consultancy for Hydromet Observation and Information Systems Integration</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of Lao PDR has received financing from the World Bank toward the cost of the Lao PDR Southeast Asia Disaster Risk Management Project (DRMP) and intends to apply part of the proceeds for consulting services. The consulting services (&ldquo;the Services&rdquo;) include the provision of comprehensive assistance and services to the Department of Meteorology and Hydrology (DMH) within the Ministry of Natural Resources and Environment (MONRE). Specifically, the consulting firm will work on the modernization and integration of DMH operations (including monitoring, forecasting and information systems) in order to harmonize and improve the quality of their products and services.</p>\r\n\r\n<p>Specifically, the priority activities of the <strong>Systems Integrator Consultant Firm</strong> are: (i) to operationalize end-to-end validated processes and systems from observations, through forecasting, leading to the delivery of weather, climate and hydrological information and services, including early warnings; (ii) to prepare technical specifications and tender documents for equipment and services; (iii) to design and implement an integrated infrastructure by linking together existing and new (if required) systems at DMH and ensuring that these function together and act as a coordinated database; (iv) to help develop new information products and services and operationalize their production; (v) to develop an interoperable data management system which will facilitate data sharing among key partners and stakeholders; and (vi) to support institutional and capacity development and provide implementation support for the DMH Project Team. In addition, the Consultant Firm&rsquo;s activities must ensure functional compatibility of the modernized meteorological and hydrological systems with the WMO global and regional systems and with the existing systems implemented at DMH.</p>\r\n\r\n<p>The Services are expected to be carried out over a period of 48 months. The estimated level of effort of the Consultant Firm would be about 140 person-months, including at least 65 person-months of international key experts.</p>\r\n\r\n<p>The Ministry of Natural Resources and Environment (MONRE) now invites eligible Consultant Firms to indicate their interest in providing the Services. Interested Consultant Firms must provide information indicating that they are qualified to perform the services (brochures, experience in the country/region, experience in similar type of assignments, experience with Multilateral Institution Financed Projects, specific experience, management structure and key company personnel, and so forth). Consultant Firms may associate with each other to enhance their qualifications.</p>\r\n\r\n<p>The Consultant Firm is expected to have at least 10 years of working experience in the hydrometeorological sector both in developed and developing countries. The Team Leader/Manager should have at least 15 years of experience. The Consultant is expected to have experience with the design and implementation of large-scale hydrometeorological modernization projects including the development of hydrometeorological observing and information systems. The Consultant should also have experience with Disaster Risk Management, aeronautical meteorological services, hydrological and meteorological early warning systems and decision support systems. The Consultant is expected to have experience in operational NMHSs and DRM agencies, particularly in developing countries. It is expected that the team includes experts from leading National Meteorological Services and National Hydrological Services.</p>\r\n\r\n<p>The detailed services and qualification requirements are included in the TOR that can be obtained from the point of contact below.</p>\r\n\r\n<p>Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications.</p>\r\n\r\n<p>A Consultant Firm will be selected in accordance with the procedures of QCBS method set out in the World Bank&rsquo;s Guidelines: Selection and Employment of Consultants by World Bank Borrowers dated January 2011, revised in July 2014.</p>\r\n\r\n<p>Interested Consultant Firms may obtain further information on working days at the address below during office hours.</p>\r\n\r\n<p>Expressions of Interest must be delivered no later than 2:00 PM on <strong>0</strong><strong>5</strong><strong> July 2018</strong> to the address below (in person, or by mail, or by fax, or by e-mail).</p>\r\n\r\n<p>Ministry of Natural Resource and Environment</p>\r\n\r\n<p>Department of Meteorology and Hydrology (DMH)</p>\r\n\r\n<p>Project Coordinator - PC-DRM-C2</p>\r\n\r\n<p>Tel&nbsp;: +8562054744333</p>\r\n\r\n<p>Email&nbsp;: vxmanivong.dmh@gmail.com</p>\r\n\r\n<p><strong>Attention&nbsp;: Mr. Viengxai Manivong</strong></p>\r\n\r\n<p>&nbsp;</p>"},{"id":"OP00042109","notice_type":"Request for Expression of Interest","noticedate":"26-Apr-2017","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2017-05-09T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Sri Lanka","project_id":"P146314","project_name":"Climate Resilience Improvement Project (CRIP)","bid_reference_no":"LK-MOIWRM-10583-CS-CQS","bid_description":"CRIP/CS/CQS/14\r\n\r\nHiaring of international expert to expedite the development of the CONOPS of the integrated forecasting and early warning system - International Hydrological Advisor","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"11, Jawatta Road,\r\nColombo 05,\r\nSri Lanka","contact_ctry_name":"Sri Lanka","contact_email":"pdcrip@sltnet.lk","contact_name":"Don Don Clement Sudharma Elakanda","contact_organization":"Ministry of Irrigation and Water Resource Management / Climate Resilience Improvement Project","contact_phone_no":"0094112058452","contact_web_url":"www.irrigationmin.gov.lk","submission_date":"2017-04-26T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Democratic Socialist Republic of Sri Lanka</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Climate Resilience Improvement Project</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Request for Expressions of Interest</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Three (3) international individual consultant positions Project Management Unit of Climate Resilience Improvement Project (CRIP)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of the Democratic Socialist Republic of Sri Lanka intends to apply part of the proceeds of the CRIP-1, financed by the World Bank, to eligible payments under the contract for which this Request for Expressions of Interest is issued.</p>\r\n\r\n<p>The Project Management Unit (PMU) is seeking three (3) individual positions that would guide and advise the Department of Meteorology (DoM), Irrigation Department (ID), National Building Research Organisation (NBRO) and the Disaster Management Centre (DMC) on the modernisation of their operations and services to improve the quality of their information products and services, especially, to minimizes losses due to floods and landslides caused by severe hydrometeorological events.</p>\r\n\r\n<ol>\r\n\t<li><strong>Senior International Consultant for Hydromet Observation and Information Systems Modernization</strong></li>\r\n</ol>\r\n\r\n<p>The Senior International Advisor will lead a small team of international advisors comprising a Hydrological Advisor and a Disaster Management Advisor. The Senior International Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project)</li>\r\n\t<li>Coordinate activities with the team of international advisors on hydrology and Disaster Risk Management (DRM);</li>\r\n\t<li>Support capacity building of the DoM, ID, NBRO and DMC staff to manage the process of strengthening hydrometeorological services, early warning and response systems;</li>\r\n\t<li>Lead the development of a comprehensive plan/roadmap for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Develop a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services). The CONOPS will be implemented as part of Component 2 of CRIP-2.</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide input to the Plan and CONOPS;</li>\r\n\t<li>Develop a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program;</li>\r\n</ul>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with other ongoing and planned development partner projects and programs;</li>\r\n\t<li>Coordinate activities and inputs to Systems Integrator Consultancy (phase 1) which will provide a detailed technical design of the modernized systems based on the new CONOPS.</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The Senior International Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 20 years of working in the hydrometeorological sector both in developed and developing countries. The Senior International Advisor should be a recognized international expert in the management, operation and development of National Meteorological and Hydrological Services (NMHSs) and delivery of services to the public and other sectors.</li>\r\n\t<li>Extensive experience in providing guidance to NMHSs on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of World Meteorological Organization (WMO) procedures and guidelines is essential. Expertise in applied meteorological services is an advantage.</li>\r\n\t<li>Experience in hands-on training of staff of NMHSs including competencies, the development of public survey tools, and organizing and conducting stakeholder workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written)</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization - Hydrology</strong></li>\r\n</ol>\r\n\r\n<p>The International Hydrological Advisor will be part of a small team led by the Senior International Advisor. The Hydrological Advisor&rsquo;s main objectives are to advise the ID and NBRO, primarily on hydrological modelling and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Hydrological Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the hydrological component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the hydrological input to the Plan and CONOPS;</li>\r\n\t<li>Develop the hydrological component of a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the hydrological training program;</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Hydrological Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the hydrometeorological sector both in developed and developing countries. The International Hydrological Advisor should be a recognized international expert in the hydrological services including hydrological modelling.</li>\r\n\t<li>Extensive experience in providing guidance to National Hydrological Services on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of WMO procedures and guidelines related to hydrology is essential.</li>\r\n\t<li>Experience in hands-on training of staff of hydrological services including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to hydrology and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization &ndash; Disaster Risk Management</strong></li>\r\n</ol>\r\n\r\n<p>The International Disaster Management Advisor will be part of a small team led by the Senior International Advisor. The Disaster Management Advisor&rsquo;s main objectives are to advise the DMC and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Disaster Management Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the DRM component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the disaster management input to the Plan and CONOPS;</li>\r\n\t<li>Develop the DRM component of a training program for national and local level staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program on DRM.</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The estimated level of effort is four months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Disaster Management Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the disaster management sector both in developed and developing countries. The Consultant should be a recognized international expert in the disaster management and emergency operations.</li>\r\n\t<li>Extensive experience in providing guidance to national disaster management centres on institutional strengthening, capacity building, and warning services. This should include experience at local and national levels.</li>\r\n\t<li>Knowledge of disaster management procedures and guidelines related to DMC is essential.</li>\r\n\t<li>Experience in hands-on training of staff of disaster management centres including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to disaster management and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Consultants will be selected in accordance with the procedures set out in the World Bank&rsquo;s <em>Guidelines: Selection and Employment of Consultants by World Bank Borrowers</em> (current edition). The Consultants will be hired as individuals.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants must provide information indicating that they are qualified to perform the services (CVs with academic background including experience in similar conditions, description of similar assignments, etc.).</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants may obtain further information at the address below during office hours Monday to Friday, from <em>0800 to 1600 hours</em> local time.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Expressions of interest must be delivered by postal mail, Fax or e-mail to the address below by <strong>09.05.2017.</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Telephone: 0094 112 058 452</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Fax: 0094 112 058 451</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>e-mail: pdcrip@sltnet.lk</strong></p>\r\n\r\n<p>&nbsp;</p>"},{"id":"OP00042111","notice_type":"Request for Expression of Interest","noticedate":"26-Apr-2017","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2017-05-09T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Sri Lanka","project_id":"P146314","project_name":"Climate Resilience Improvement Project (CRIP)","bid_reference_no":"LK-MOIWRM-10584-CS-CQS","bid_description":"CRIP/CS/CQS/15\r\n\r\nHiaring of international expert to expedite the development of the CONOPS of the integrated forecasting and early warning system - International Disaster Management Advisor","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"11, Jawatta Road,\r\nColombo 05,\r\nSri Lanka","contact_ctry_name":"Sri Lanka","contact_email":"pdcrip@sltnet.lk","contact_name":"Don Don Clement Sudharma Elakanda","contact_organization":"Ministry of Irrigation and Water Resource Management / Climate Resilience Improvement Project","contact_phone_no":"0094112058452","contact_web_url":"www.irrigationmin.gov.lk","submission_date":"2017-04-26T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Democratic Socialist Republic of Sri Lanka</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Climate Resilience Improvement Project</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Request for Expressions of Interest</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Three (3) international individual consultant positions Project Management Unit of Climate Resilience Improvement Project (CRIP)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of the Democratic Socialist Republic of Sri Lanka intends to apply part of the proceeds of the CRIP-1, financed by the World Bank, to eligible payments under the contract for which this Request for Expressions of Interest is issued.</p>\r\n\r\n<p>The Project Management Unit (PMU) is seeking three (3) individual positions that would guide and advise the Department of Meteorology (DoM), Irrigation Department (ID), National Building Research Organisation (NBRO) and the Disaster Management Centre (DMC) on the modernisation of their operations and services to improve the quality of their information products and services, especially, to minimizes losses due to floods and landslides caused by severe hydrometeorological events.</p>\r\n\r\n<ol>\r\n\t<li><strong>Senior International Consultant for Hydromet Observation and Information Systems Modernization</strong></li>\r\n</ol>\r\n\r\n<p>The Senior International Advisor will lead a small team of international advisors comprising a Hydrological Advisor and a Disaster Management Advisor. The Senior International Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project)</li>\r\n\t<li>Coordinate activities with the team of international advisors on hydrology and Disaster Risk Management (DRM);</li>\r\n\t<li>Support capacity building of the DoM, ID, NBRO and DMC staff to manage the process of strengthening hydrometeorological services, early warning and response systems;</li>\r\n\t<li>Lead the development of a comprehensive plan/roadmap for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Develop a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services). The CONOPS will be implemented as part of Component 2 of CRIP-2.</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide input to the Plan and CONOPS;</li>\r\n\t<li>Develop a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program;</li>\r\n</ul>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with other ongoing and planned development partner projects and programs;</li>\r\n\t<li>Coordinate activities and inputs to Systems Integrator Consultancy (phase 1) which will provide a detailed technical design of the modernized systems based on the new CONOPS.</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The Senior International Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 20 years of working in the hydrometeorological sector both in developed and developing countries. The Senior International Advisor should be a recognized international expert in the management, operation and development of National Meteorological and Hydrological Services (NMHSs) and delivery of services to the public and other sectors.</li>\r\n\t<li>Extensive experience in providing guidance to NMHSs on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of World Meteorological Organization (WMO) procedures and guidelines is essential. Expertise in applied meteorological services is an advantage.</li>\r\n\t<li>Experience in hands-on training of staff of NMHSs including competencies, the development of public survey tools, and organizing and conducting stakeholder workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written)</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization - Hydrology</strong></li>\r\n</ol>\r\n\r\n<p>The International Hydrological Advisor will be part of a small team led by the Senior International Advisor. The Hydrological Advisor&rsquo;s main objectives are to advise the ID and NBRO, primarily on hydrological modelling and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Hydrological Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the hydrological component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the hydrological input to the Plan and CONOPS;</li>\r\n\t<li>Develop the hydrological component of a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the hydrological training program;</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Hydrological Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the hydrometeorological sector both in developed and developing countries. The International Hydrological Advisor should be a recognized international expert in the hydrological services including hydrological modelling.</li>\r\n\t<li>Extensive experience in providing guidance to National Hydrological Services on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of WMO procedures and guidelines related to hydrology is essential.</li>\r\n\t<li>Experience in hands-on training of staff of hydrological services including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to hydrology and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization &ndash; Disaster Risk Management</strong></li>\r\n</ol>\r\n\r\n<p>The International Disaster Management Advisor will be part of a small team led by the Senior International Advisor. The Disaster Management Advisor&rsquo;s main objectives are to advise the DMC and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Disaster Management Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the DRM component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the disaster management input to the Plan and CONOPS;</li>\r\n\t<li>Develop the DRM component of a training program for national and local level staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program on DRM.</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The estimated level of effort is four months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Disaster Management Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the disaster management sector both in developed and developing countries. The Consultant should be a recognized international expert in the disaster management and emergency operations.</li>\r\n\t<li>Extensive experience in providing guidance to national disaster management centres on institutional strengthening, capacity building, and warning services. This should include experience at local and national levels.</li>\r\n\t<li>Knowledge of disaster management procedures and guidelines related to DMC is essential.</li>\r\n\t<li>Experience in hands-on training of staff of disaster management centres including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to disaster management and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Consultants will be selected in accordance with the procedures set out in the World Bank&rsquo;s <em>Guidelines: Selection and Employment of Consultants by World Bank Borrowers</em> (current edition). The Consultants will be hired as individuals.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants must provide information indicating that they are qualified to perform the services (CVs with academic background including experience in similar conditions, description of similar assignments, etc.).</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants may obtain further information at the address below during office hours Monday to Friday, from <em>0800 to 1600 hours</em> local time.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Expressions of interest must be delivered by postal mail, Fax or e-mail to the address below by <strong>09.05.2017.</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Telephone: 0094 112 058 452</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Fax: 0094 112 058 451</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>e-mail: pdcrip@sltnet.lk</strong></p>"},{"id":"OP00042110","notice_type":"Request for Expression of Interest","noticedate":"26-Apr-2017","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2017-05-09T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Sri Lanka","project_id":"P146314","project_name":"Climate Resilience Improvement Project (CRIP)","bid_reference_no":"LK-MOIWRM-10581-CS-CQS","bid_description":"CRIP/CS/CQS/13\r\n\r\nHiaring of international expert to expedite the development of the CONOPS of the integrated forecasting and early warning system - Senior International Advisor on Hydromet Modernization","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"11, Jawatta Road,\r\nColombo 05,\r\nSri Lanka","contact_ctry_name":"Sri Lanka","contact_email":"pdcrip@sltnet.lk","contact_name":"Don Don Clement Sudharma Elakanda","contact_organization":"Ministry of Irrigation and Water Resource Management / Climate Resilience Improvement Project","contact_phone_no":"0094112058452","contact_web_url":"www.irrigationmin.gov.lk","submission_date":"2017-04-26T00:00:00Z","notice_text":"<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong> &nbsp;Democratic Socialist Republic of Sri Lanka</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Climate Resilience Improvement Project</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Request for Expressions of Interest</strong></p>\r\n\r\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Three (3) international individual consultant positions Project Management Unit of Climate Resilience Improvement Project (CRIP)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of the Democratic Socialist Republic of Sri Lanka intends to apply part of the proceeds of the CRIP-1, financed by the World Bank, to eligible payments under the contract for which this Request for Expressions of Interest is issued.</p>\r\n\r\n<p>The Project Management Unit (PMU) is seeking three (3) individual positions that would guide and advise the Department of Meteorology (DoM), Irrigation Department (ID), National Building Research Organisation (NBRO) and the Disaster Management Centre (DMC) on the modernisation of their operations and services to improve the quality of their information products and services, especially, to minimizes losses due to floods and landslides caused by severe hydrometeorological events.</p>\r\n\r\n<ol>\r\n\t<li><strong>Senior International Consultant for Hydromet Observation and Information Systems Modernization</strong></li>\r\n</ol>\r\n\r\n<p>The Senior International Advisor will lead a small team of international advisors comprising a Hydrological Advisor and a Disaster Management Advisor. The Senior International Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project)</li>\r\n\t<li>Coordinate activities with the team of international advisors on hydrology and Disaster Risk Management (DRM);</li>\r\n\t<li>Support capacity building of the DoM, ID, NBRO and DMC staff to manage the process of strengthening hydrometeorological services, early warning and response systems;</li>\r\n\t<li>Lead the development of a comprehensive plan/roadmap for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Develop a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services). The CONOPS will be implemented as part of Component 2 of CRIP-2.</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide input to the Plan and CONOPS;</li>\r\n\t<li>Develop a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program;</li>\r\n</ul>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with other ongoing and planned development partner projects and programs;</li>\r\n\t<li>Coordinate activities and inputs to Systems Integrator Consultancy (phase 1) which will provide a detailed technical design of the modernized systems based on the new CONOPS.</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The Senior International Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 20 years of working in the hydrometeorological sector both in developed and developing countries. The Senior International Advisor should be a recognized international expert in the management, operation and development of National Meteorological and Hydrological Services (NMHSs) and delivery of services to the public and other sectors.</li>\r\n\t<li>Extensive experience in providing guidance to NMHSs on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of World Meteorological Organization (WMO) procedures and guidelines is essential. Expertise in applied meteorological services is an advantage.</li>\r\n\t<li>Experience in hands-on training of staff of NMHSs including competencies, the development of public survey tools, and organizing and conducting stakeholder workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written)</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization - Hydrology</strong></li>\r\n</ol>\r\n\r\n<p>The International Hydrological Advisor will be part of a small team led by the Senior International Advisor. The Hydrological Advisor&rsquo;s main objectives are to advise the ID and NBRO, primarily on hydrological modelling and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Hydrological Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the hydrological component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the hydrological input to the Plan and CONOPS;</li>\r\n\t<li>Develop the hydrological component of a training program for staff to meet current and future requirements;</li>\r\n\t<li>Implement the hydrological training program;</li>\r\n</ul>\r\n\r\n<p>The estimated level of effort is six months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Hydrological Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the hydrometeorological sector both in developed and developing countries. The International Hydrological Advisor should be a recognized international expert in the hydrological services including hydrological modelling.</li>\r\n\t<li>Extensive experience in providing guidance to National Hydrological Services on institutional strengthening, capacity building, forecasting and warnings, and service delivery.</li>\r\n\t<li>Knowledge of WMO procedures and guidelines related to hydrology is essential.</li>\r\n\t<li>Experience in hands-on training of staff of hydrological services including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to hydrology and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ol>\r\n\t<li><strong>International Consultant for Hydromet Observation and Information Systems Modernization &ndash; Disaster Risk Management</strong></li>\r\n</ol>\r\n\r\n<p>The International Disaster Management Advisor will be part of a small team led by the Senior International Advisor. The Disaster Management Advisor&rsquo;s main objectives are to advise the DMC and work with the other members of the team to develop a plan for the integrated modernization of DoM, ID, NBRO and DMC. The Disaster Management Advisor is expected to:</p>\r\n\r\n<ul>\r\n\t<li>Coordinate activities with the Project team working under Climate Resilience Improvement Project (CRIP-1) (Project);</li>\r\n\t<li>Coordinate activities with the Senior International Advisor on Hydromet modernization;</li>\r\n\t<li>Contribute to the development of a comprehensive plan for the modernization of observing, forecasting and warning services;</li>\r\n\t<li>Contribute to the development of a Concept of Operations (CONOPS) of DoM, ID, NBRO and DMC (i.e., how the modernization will change the way DOM, ID, NBRO and DMC provide and use forecasts and services); the primary focus will be on the DRM component. The CONOPS will be implemented as a part of Component 2 of CRIP-2;</li>\r\n\t<li>Facilitate workshops with stakeholders and technical experts, which will provide the disaster management input to the Plan and CONOPS;</li>\r\n\t<li>Develop the DRM component of a training program for national and local level staff to meet current and future requirements;</li>\r\n\t<li>Implement the training program on DRM.</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The estimated level of effort is four months spread over one calendar year with the possibility of extension by agreement. It is expected that the Consultant will spend 80% of this time in Sri Lanka.</p>\r\n\r\n<p>The International Disaster Management Advisor will have the following minimum qualifications and experience:</p>\r\n\r\n<ul>\r\n\t<li>At least 15 years of working in the disaster management sector both in developed and developing countries. The Consultant should be a recognized international expert in the disaster management and emergency operations.</li>\r\n\t<li>Extensive experience in providing guidance to national disaster management centres on institutional strengthening, capacity building, and warning services. This should include experience at local and national levels.</li>\r\n\t<li>Knowledge of disaster management procedures and guidelines related to DMC is essential.</li>\r\n\t<li>Experience in hands-on training of staff of disaster management centres including competencies, and organizing and conducting training workshops.</li>\r\n\t<li>Knowledge of leading experts in critical areas of the project related to disaster management and ability to facility their participation in the project as required.</li>\r\n\t<li>Demonstrated skills in communication (oral and written).</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Consultants will be selected in accordance with the procedures set out in the World Bank&rsquo;s <em>Guidelines: Selection and Employment of Consultants by World Bank Borrowers</em> (current edition). The Consultants will be hired as individuals.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants must provide information indicating that they are qualified to perform the services (CVs with academic background including experience in similar conditions, description of similar assignments, etc.).</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested consultants may obtain further information at the address below during office hours Monday to Friday, from <em>0800 to 1600 hours</em> local time.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Expressions of interest must be delivered by postal mail, Fax or e-mail to the address below by <strong>09.05.2017.</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Telephone: 0094 112 058 452</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Fax: 0094 112 058 451</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>e-mail: pdcrip@sltnet.lk</strong></p>\r\n\r\n<p>&nbsp;</p>"},{"id":"OP00040906","notice_type":"Invitation for Bids","noticedate":"07-Feb-2017","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2017-03-20T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"India","project_id":"P152210","project_name":"India: Andhra Pradesh Rural Inclusive Growth Project","bid_reference_no":"IN-SERP-AP-2161-GO-RFB","bid_description":"DESIGN, DEVELOP, IMPLEMENT AND MAINTAIN INTEGRATED IT APPLICATIONS UNDER APRIGP, ANDHRA PRADESH","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"2nd Floor,\r\nNTR Administrative Block,\r\nPandit Nehru Bus Station,\r\nVijayawada-520001","contact_ctry_name":"India","contact_email":"Ita.unnathi.serp@gmail.com","contact_name":"Suneel Babu","contact_organization":"Society for Elimination of Rural Poverty","contact_phone_no":"9000980603","submission_date":"2017-02-07T00:00:00Z","notice_text":"<p>SPECIFIC PROCUREMENT NOTICE</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>INDIA</strong></p>\r\n\r\n<p><strong>ANDHRA PRADESH RURAL INCLUSIVE GROWTH PROJECT</strong></p>\r\n\r\n<p>Credit No.: 5576-IN</p>\r\n\r\n<p><strong>Contract Title: </strong>Design, Develop, Implement and Maintain Integrated IT Applications under APRIGP</p>\r\n\r\n<p><strong>Reference No</strong>. (as per Procurement Plan): IN-SERP-AP-2161-GO-RFB</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of India <strong>has received </strong>a <strong>loan from </strong>the <strong>International Bank for Reconstruction and Development </strong>toward the cost of <strong>Andhra Pradesh Rural Inclusive Growth Project</strong>, and it intends to apply part of the proceeds of this <strong>loan to </strong>payments under the agreement(s) resulting from this IFB: <strong>Design, Develop, Implement and Maintain Integrated IT Applications under APRIGP, Andhra Pradesh, Andhra Pradesh</strong></p>\r\n\r\n<p>The Chief Executive Officer, SERP, Government of Andhra Pradesh serves as the implementing agency for the project and now invites sealed bids from eligible bidders for Selection of System Integrator for Implementation of Integrated Application for SERP, Andhra Pradesh</p>\r\n\r\n<p>Bidding will be conducted using the International Competitive Bidding (ICB) procedures specified in the World Bank&rsquo;s Guidelines: Procurement under IBRD Loans and IDA Credits, edition of May 2004, revised October 1, 2006,May 1, 2010 and July 1, 2014 is open to all Bidders eligible as defined in these Guidelines that meet the minimum qualification criteria.</p>\r\n\r\n<p>Interested eligible bidders may obtain further information from The Chief Executive Officer, SERP, Andhra Pradesh and inspect the bidding documents at the address given below from 10.30 Hrs to 17:00 Hrs A pre-bid meeting which potential bidders may attend will be held on the 20-02-2017. Interested bidders are requested to post their queries as per the Form mentioned in the Bidding Documents.</p>\r\n\r\n<p>A complete set of bidding documents in English Language may be downloaded from <u>http://www.ap.serp.gov.in</u>. The downloadable version of the bidding documents, and any addenda to it, will be the binding one. The bidder would be responsible for ensuring that any addenda available on the website is also downloaded and incorporated.</p>\r\n\r\n<p>Bids must be delivered to the address below at or before the 20-03-2017, 15.00 Hrs IST<strong>. The amount of Bid Security required is Indian Rupees Fifty Lakhs only or an equivalent amount in a freely convertible currency</strong>. Late bids will be rejected. Bids will be opened in the presence of bidders&rsquo; representatives who choose to attend at the address below immediately after the closing time of submission of Bids.</p>\r\n\r\n<p>In the event of the date specified for bid receipt and opening being declared as a closed holiday for the Employer&rsquo;s office, the due date for submission of bids and opening of bids will be the following working day at the appointed time.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Address:</p>\r\n\r\n<p>The Chief Executive Officer</p>\r\n\r\n<p>Society for Elimination of Rural Poverty (SERP),</p>\r\n\r\n<p>2nd Floor, NTR Administrative Block,</p>\r\n\r\n<p>Pandit Nehru Bus Station</p>\r\n\r\n<p>Vijayawada - 520001</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Attention: Director, Procurement</p>\r\n\r\n<p>Phone No: +91 866 2410017 / +91 866 2410018</p>\r\n\r\n<p>E-mail address: spmproc@gmail.com</p>"},{"id":"OP00037117","notice_type":"Request for Expression of Interest","noticedate":"13-Apr-2016","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"India","project_id":"P147864","project_name":"Uttar Pradesh Core Road Network Development Project","bid_reference_no":"Folder 10","bid_description":"Project Management Services to Develop Specifications for a Crash Data Analysis  System (CDAS) for Uttar Pradesh, and support its implementation","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Sector-18, Vrindavan Yojana-4, PO Kalli Pashchim, Mohanlalganj,","contact_ctry_name":"India","contact_email":"sph-up@gov.in","contact_name":"UTTAR PRADESH TRAFFIC DIRECTORATE","contact_organization":"UTTAR PRADESH HIGHWAY POLICE PROJECT","contact_phone_no":"0522 2050243","submission_date":"2016-04-13T00:00:00Z","notice_text":"<P>&nbsp;<BR>UTTAR PRADESH POLICE</P>\n<P>REQUEST FOR EXPRESSIONS OF INTEREST<BR>(CONSULTING SERVICES – FIRMS SELECTION)</P>\n<P>INDIA<BR>UTTAR PRADESH CORE ROAD NETWORK DEVELOPMENT PROGRAM (UPCRNDP)</P>\n<P>Assignment Title: Project Management Services to Develop Specifications for a \"Crash Data Analysis&nbsp; System (CDAS)\" for Uttar Pradesh, and support its implementation <BR>Reference No. </P>\n<P>GoUP has applied for financing from the World Bank toward the costof the proposed UPCRNDP, which includes a road safety component to beimplemented by the UP Police, and intends to apply part of the proceeds for consulting services. </P>\n<P><BR>This Consultancy aims to Design and develop&nbsp; specifications for a computerized Crash Data Analysis System (CDAS) to meet the road safety management requirement of the State as well as the national level needs in data integration and reporting. Once the UPCDAS is developed and tested it will be available for other states to implement. The system will be a property of the GoUP. Implementation in other states will be undertaken outside of this activity. It is important thoughthat the system developed for UP has the provisions for central levelintegration. </P>\n<P><BR>The consulting services would include reviewing exiting processes and recommending IT solution for implementing CDAS, including its integration with CCTNS(Crime and Criminal Tracking Network System), supervising and managing the rolling out in entire state, providing inputs in overall system architecture including re-sizing of hardware, networking and software; developing an overall IT strategy and a road mapfor moving over from the manual to the IT system; planning on data migration; preparation of procurement documents for System Integrator consultant; technical assistance for organizational change management process and co-coordinating with stake-holders to successfully operationalize and institutionalize the system. This assignment does not involve the system development, which will be developed by the System Integrator through a separate contract. Selection as consultant for this work will make Consultant ineligible for IT system development task.</P>\n<P><BR>The Consultancy will&nbsp; Support PIU during entire procurement process of hiring&nbsp; System Integrator for the database development, including a review of the system, testing, supervising piloting and roll out of the system state-wide, and development of training programs for different groups of users. In addition to coordinating and consulting all key stakeholders in the state, the Consultant will need to coordinate with Ministry of Home, National Crime Records Bureau (NCRB), Ministry of Transport, GoI and other related central and state agencies to review requirements of data sets at the national and state levels and develop data integration and reporting process. The Consultant would also be required to oversee, supervise and scrutinize the tasks and activities to be carried out by other consultants who would be assigned with specific tasks under the ambit of the umbrella project ofimplementing CDAS. </P>\n<P><BR>The total duration of the services is expected to be about 30 months.<BR>The Traffic Directorate, UP Police, Government of UP, now invites eligible consulting firms (\"Consultants\") to indicate their interest in providing the Services. Interested Consultants should provideinformation demonstrating that they have the required qualifications and relevant experience to perform the Services. <BR>The shortlisting criteria are: </P>\n<P><BR>•&nbsp;Similar experience in managing crash data system projects, both in high-income and in low- and middle-income countries (55); <BR>•&nbsp;IT project management expertise (25); <BR>•&nbsp;experienceworking with police (10); <BR>•&nbsp;road safety expertise – especially in the use of crash data for policy development, and development ofroad safety improvement programs (10).</P>\n<P>The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank's Guidelines: Selection and Employment of Consultants [under IBRD Loans and IDA Credits &amp; Grants] by World Bank Borrowers [January 2011, revised July 2014 edition] (\"Consultant Guidelines\"), setting forth the World Bank's policy on conflict of interest.&nbsp; Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications.</P>\n<P>A Consultant will be selected in accordance with the QCBS method set out in the Consultant Guidelines.<BR>Further information can be obtained at the address below during office hours 09:30 to 18:00 hours.<BR>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, by fax or by e-mail) by Thursday,30th April 2016, 15:00 hrs.</P>\n<P><BR>UTTAR PRADESH HIGHWAY POLICE PROJECT <BR>UTTAR PRADESH TRAFFICDIRECTORATE<BR>Sector-18, Vrindavan Yojana-4, PO Kalli Pashchim, Mohanlalganj, LUCKNOW (UP)- 227305<BR>Phone:0522-2050243, Fax: 0522-2209519, email: <A href=\"mailto:sph-up@gov.in\">sph-up@gov.in</A><BR></P>"}]}