{"rows":20,"os":"0","page":"1","total":"777","procnotices":[{"id":"OP00469389","notice_type":"Request for Expression of Interest","noticedate":"16-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-30T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Fiji","project_id":"P515153","project_name":"Fiji Energy Transformation Project Preparation","bid_reference_no":"FJ-EFL-567224-CS-INDV","bid_description":"Environmental and Social Specialists (international) – 90 days","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"2 Marlow Street\nSuva, Fiji","contact_ctry_name":"Fiji","contact_email":"bobbyc@efl.com.fj","contact_name":"Bobby Naimawi","contact_organization":"Energy Fiji Limited","contact_phone_no":"(679) 9992468","contact_web_url":"www.efl.com.fj","submission_date":"2026-09-16T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST - INDIVIDUAL CONSULTANT SELECTION</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:206px\"><p><strong>Name of Project</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:456px\"><p>Fiji Energy Transformation Project (P518499) - Grant Facility for Project Preparation (GFPP)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Loan No/Credit No/Grant Number</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>GFPP Grant No. TF0D0728</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>International Environmental and Social (E&amp;S) Specialist</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Procurement Plan Ref Number</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>FJ-EFL-567224-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Reference No.</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>EOI-04/2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Country of Delivery</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>Republic of Fiji</p></td></tr></tbody></table><p>&nbsp;</p><p>The Republic of Fiji, acting through Energy Fiji Limited (EFL), has received financing from the World Bank toward the cost of preparing the Fiji Energy Transformation Project and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&quot;the Services&quot;) comprise specialist environmental and social support to EFL&#39;s Project Preparation Unit. The Consultant will lead preparation of appraisal-stage environmental and social instruments, integrate requirements of the World Bank Environmental and Social Framework into technical and procurement outputs, support policy and regulatory reviews, and prepare a procurement-ready terms of reference for a separate assignment to develop and operationalize EFL&#39;s institutional Environmental and Social Management System.</p><p>&nbsp;</p><p><strong>The Services will cover:</strong></p><p>&bull; general environmental and social support to the Project Preparation Unit, including screening, risk-register management, ESCP inputs, coordination and practical capacity building;</p><p>&bull; preparation of E&amp;S scoping studies with critical-habitat screening, a site-specific ESMP for aging asset replacement, an RPF, negotiated land agreement due diligence, an integrated SEP, and LMP;</p><p>&bull; preparation of a procurement-ready TOR for development and operationalization of EFL&#39;s institutional ESMS;</p><p>&bull; environmental and social review of Electricity Act amendments, Rooftop Solar PV Policy, and private-sector renewable-energy participation;</p><p>&bull; E&amp;S inputs to the National control-centre upgrade, , aging power-infrastructure, grid-interconnection, hydropower and solar PV/BESS studies and concept designs; and</p><p>&bull; monthly and quarterly reporting, disclosure support and an appraisal-stage E&amp;S readiness summary.</p><p>&nbsp;</p><p><strong>Implementation period: The assignment is expected to be part-time for the full GFPP implementation period, estimated at [24 months], subject to satisfactory performance and availability of GFPP financing.</strong></p><p>&nbsp;</p><p>Terms of Reference: The detailed Terms of Reference are attached to this REOI as Appendix 1.</p><p>&nbsp;</p><p>Energy Fiji Limited now invites eligible individual consultants (&quot;Consultants&quot;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they possess the required qualifications and relevant experience.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to the applicable provisions of the World Bank Procurement Regulations for IPF Borrowers concerning conflict of interest.</p><p>&nbsp;</p><p><strong>EOI Evaluation Criteria</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:581px\"><p><strong>Criterion</strong></p></td><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:82px\"><p><strong>Weight</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>1. Relevant E&amp;S assessment and management experience for infrastructure or energy projects</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>25%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>2. Demonstrated application of the World Bank ESF or IFC Performance Standards and preparation of ESMP, land/resettlement, SEP/GRM and LMP instruments</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>3. Experience in biodiversity and critical-habitat screening, ESS5 land due diligence, and ESS7 engagement and FPIC</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>4. Relevant renewable-energy, grid infrastructure, hazardous-materials, Pacific or Fiji experience, including familiarity with iTaukei land tenure and governance</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>15%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>5. Qualifications, writing, coordination, consultation and capacity-building capability</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Form and content of the Expression of Interest</strong>:</p><p>Expressions of interest should contain only the information necessary to assess the criteria above. Consultants should submit a curriculum vitae and a concise statement demonstrating relevant assignments and experience.</p><p>A financial proposal is not required at this stage.</p><p>The Consultant assessed as best qualified against the criteria will be invited to negotiate a contract in accordance with the applicable procurement arrangements.</p><p><strong>Submission</strong></p><p>Further information may be obtained by emailing tenders@efl.com.fj during office hours, 8:00 AM to 4:30 PM Fiji Time, Monday to Friday, no later than three clear days before the closing date.</p><p>Expressions of interest must be uploaded to the EFL e-Tender Portal (TenderLink) at https://www.tenderlink.com/efl by registering your company, by 4:00 PM (1600 hrs) Fiji Time on Wednesday, 30th September 2026.</p><p>EOI documents may be viewed and downloaded from&nbsp;www.efl.com.fj(opens in new window)&nbsp;or&nbsp;https://www.tenderlink.com/efl(opens in new window).</p><p><strong>Submissions by email or facsimile will not be accepted. Hard-copy submissions to the tender box at EFL Head Office, Suva, will not be accepted.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 1 - Terms of Reference</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>INTERNATIONAL ENVIRONMENTAL AND SOCIAL (E&amp;S) SPECIALIST</strong></p><p><strong>Fiji Energy Transformation Project (P518499)</strong></p><p>Grant Facility for Project Preparation (GFPP) - Energy Fiji Limited (EFL)</p><p>1. Introduction and Background</p><p>Energy Fiji Limited (EFL) is preparing the Fiji Energy Transformation Project (P518499), a World Bank-supported initiative estimated at USD 230 million. The project aims to accelerate renewable-energy development, modernize the power grid, rehabilitate aging infrastructure, and reform the power sector to attract private investment in solar energy. Key interventions span Viti Levu, Vanua Levu and Taveuni, including solar PV/BESS parks of more than 50 MW each, grid-evacuation infrastructure, transmission-line upgrades and modernization of existing power stations.</p><p>The Initial Environmental and Social Review Summary has classified the project&#39;s environmental and social risks as Substantial, reflecting biodiversity impacts, customary iTaukei land tenure, community health and safety, labor influx, SEA/SH risks, and supply-chain concerns associated with PV modules and battery energy storage systems.</p><p>EFL is establishing a Project Preparation Unit (PPU) to prepare the project for appraisal and Board approval. The E&amp;S Specialist will lead preparation of required E&amp;S instruments, integrate E&amp;S requirements into technical and procurement outputs, and prepare the TOR for a separate capacity-building assignment to develop and operationalize EFL&#39;s institutional ESMS.</p><p>2. Objectives of the Assignment</p><p>The objective is to ensure that GFPP-financed preparation activities and the investments they support comply with the World Bank Environmental and Social Framework, the project Environmental and Social Commitment Plan, applicable Fiji law, and Good International Industry Practice.</p><p>3. Scope of Work</p><p>The Consultant will perform the following tasks, organized into five functional areas:</p><p>3.1 General E&amp;S Support to the PPU</p><p>&bull; Serve as the PPU&#39;s E&amp;S focal point and advise the Project Manager and technical teams on application of the ESF.</p><p>&bull; Screen preparation activities and concept designs, identify applicable standards and instruments, and maintain an E&amp;S Risk Register with actions, responsibilities and status.</p><p>&bull; Prepare ESCP inputs, TORs for specialized studies, and E&amp;S requirements for technical specifications and bidding documents; oversee related consultant outputs.</p><p>&bull; Provide practical ESF training and on-the-job support to the PPU and relevant EFL staff.</p><p>&bull; Coordinate with the World Bank, relevant Fiji agencies, TLTB, technical consultants and EFL departments, and maintain records of key decisions and actions.</p><p>3.2 Preparation of E&amp;S Instruments Required by Appraisal</p><p><em>This is the most critical function of the assignment. The E&amp;S Specialist will prepare the following appraisal-stage instruments and related outputs:</em></p><p>a. E&amp;S Scoping Studies with Critical Habitat Screening</p><p>&bull; Lead scoping studies for solar PV/BESS parks on Vanua Levu and Taveuni, grid-evacuation infrastructure, and new or upgraded transmission lines.</p><p>&bull; Conduct structured Critical Habitat screening under ESS6 using available biodiversity data, including IUCN Red List species, Fiji endemic avifauna information, and protected-area registries.</p><p>&bull; Where critical habitat is identified or cannot be ruled out, prepare detailed assessments and, where necessary, a Biodiversity Management Plan with offset strategies, no-go zones and seasonal restrictions.</p><p>&bull; Include baseline social surveys, land-tenure mapping, community presence, vulnerable-group identification, and climate-resilience considerations such as cyclone, flooding and sea-level-rise risks.</p><p>b. Environmental and Social Management Plan - Aging Asset Replacement</p><p>&bull; Prepare a site-specific ESMP for rehabilitation and replacement of aging power infrastructure under Component 3, covering baseline conditions, construction and operational risks, hazardous materials including PCBs, asbestos and e-waste, mitigation, monitoring, emergency response, contractor requirements, responsibilities, schedules and costs.</p><p>c. Resettlement Policy Framework</p><p>&bull; Prepare an RPF consistent with ESS5 covering legal and institutional arrangements and gap analysis; eligibility and cut-off dates; entitlements and replacement-cost valuation; livelihood restoration; procedures for site-specific plans; consultation and grievance arrangements; monitoring, responsibilities and budget provisions.</p><p>d. Negotiated Land Agreement Due Diligence Report</p><p>&bull; Identify and document all project sites or corridors where land or access rights have been or may be secured through negotiated settlement or other voluntary arrangement, and verify consistency with ESS5 and Fiji law.</p><p>&bull; Prepare an inventory of leases, easements, access and land-use agreements, donations, transfers and other consensual arrangements, recording parcels, rights-holders, status, duration, consideration, benefits and supporting evidence.</p><p>&bull; Assess whether each arrangement is voluntary, transparent, informed and free from coercion; whether formal, informal, customary, secondary and shared rights-holders were identified and represented; and whether participants had sufficient information, time, advice and a genuine right to refuse.</p><p>&bull; For customary land and resources, screen whether ESS7 and FPIC apply. Where required, document a culturally appropriate collective process through institutions selected by affected iTaukei communities, with participation of women, youth and potentially excluded rights-holders. Do not infer FPIC solely from approvals by TLTB, agencies or individual owners.</p><p>&bull; Where applicable, confirm and document eligibility cut-off dates, culturally appropriate public notice, valuation and compensation or benefit methodology, replacement-cost consistency, implementation status, grievances and corrective actions.</p><p>&bull; Conclude for each arrangement whether ESS5 criteria are demonstrated and identify any additional instrument, remedial action, responsible party and completion deadline required before access or civil works.</p><p>e. Integrated Stakeholder Engagement Plan</p><p>&bull; Prepare a project-level SEP consistent with ESS10, including stakeholder analysis, differentiated engagement for disadvantaged or vulnerable groups, disclosure, responsibilities, schedule, monitoring and reporting.</p><p>&bull; Include a culturally appropriate consultation plan for communities potentially affected by solar PV/BESS and associated infrastructure, covering languages, timing, representation, feedback, land arrangements, benefit sharing and any ESS7 FPIC process.</p><p>&bull; Establish an accessible project grievance mechanism and a confidential, survivor-centered SEA/SH reporting and referral pathway.</p><p>f. Labor Management Procedures</p><p>&bull; Prepare LMP consistent with ESS2 for direct, contracted, community and primary supply workers, including applicable law and gaps, terms and conditions, OHS, emergency preparedness, accommodation, labor influx, child and forced labor, PV/BESS supply-chain due diligence, codes of conduct, worker grievances, contractor obligations and training.</p><p>g. TOR for Development and Operationalization of EFL&#39;s ESMS</p><p>&bull; Prepare a procurement-ready TOR and supporting inputs for a separate assignment to develop and operationalize EFL&#39;s institutional ESMS including potential staffing and structure to ensure the ESMS is properly resourced, strategically aligned, and embedded within EFL for lasting effectiveness.</p><p>&bull; Define objectives, scope, methodology, deliverables, schedule, expertise, coordination, knowledge transfer and acceptance criteria. Cover policy and governance; screening; stakeholder, labor, land, biodiversity, pollution, community-safety, cultural-heritage, contractor and supply-chain management; incident response; monitoring; reporting; tools; templates; training; and a time-bound implementation plan.</p><p>&bull; Consult relevant EFL departments. This assignment does not include development or implementation of the ESMS.</p><p>3.3 Policy and Regulatory Support</p><p>&bull; Review proposed amendments to Fiji&#39;s Electricity Act from an E&amp;S perspective, identify gaps with the World Bank ESF and international good practice, and recommend measures for the revised policy.</p><p>&bull; Review the proposed Rooftop Solar PV Policy from an E&amp;S perspective, including potential effects on consumers, community uptake and grid workers.</p><p>&bull; Advise on E&amp;S requirements for private-sector renewable-energy participation, including application of IFC Performance Standards and World Bank ESF requirements to PPP or private-investment components.</p><p>&bull; Assess EFL&#39;s potential for an Environmental and Social Policy and support EFL&#39;s E&amp;S team to derive and implement a practical policy.</p><p>3.4 E&amp;S Inputs to Technical Studies and Infrastructure Components</p><p>&bull; National Control Center Upgrade: identify E&amp;S risks associated with civil works, OHS, asbestos and PCBs, and recommend mitigation for technical specifications.</p><p>&bull; Modernization of Nabouwalu Government Station: conduct site-specific screening, identify community-proximity, worker-community and hazardous-material risks, and prepare an ESMP if required.</p><p>&bull; Aging Infrastructure Rehabilitation: supplement the Component 3 ESMP with screening and, where feasible, inspection of all proposed sub-sites for hazardous materials, cultural heritage and social risks.</p><p>&bull; Power Grid Interconnection, Vanua Levu-Taveuni: support feasibility and engineering studies with environmental and social routing-alternatives analysis and identification of a preferred route based on E&amp;S criteria.</p><p>&bull; Hydropower: prepare assessment TOR requirements covering direct, indirect, induced and cumulative life-cycle impacts across the relevant catchment, including flows, sediment, biodiversity, ecosystem services, water use, livelihoods, land, safety, cultural heritage, associated facilities, alternatives, mitigation, monitoring and adaptive management.</p><p>&bull; Solar PV/BESS Parks: provide E&amp;S inputs to concept designs for two parks of more than 50 MW each, including environmentally and socially informed site-selection criteria and ESF compliance review.</p><p>3.5 Monitoring, Reporting and Disclosure</p><p>&bull; Submit monthly E&amp;S progress reports covering instrument preparation, risk-register actions, engagement, grievances, emerging issues and preparation-phase ESCP commitments.</p><p>&bull; Prepare quarterly stakeholder-engagement summaries.</p><p>&bull; Coordinate disclosure through EFL and other required channels and make accessible copies available to affected communities.</p><p>&bull; Prepare an appraisal-stage E&amp;S readiness summary recording instrument status, review, disclosure, outstanding actions and post-appraisal timelines.</p><p>4. Methodology</p><p>&bull; Desktop review of project, legal, technical and E&amp;S documentation and available baseline data.</p><p>&bull; Structured screening, site visits and physical inspections where feasible.</p><p>&bull; Stakeholder consultations with EFL, government agencies, TLTB, affected communities, technical consultants and the World Bank.</p><p>&bull; Application of the World Bank ESF, ESCP, applicable Fiji law, GIIP and the mitigation hierarchy.</p><p>&bull; Iterative preparation, review and revision of instruments, with clear evidence trails, action tracking and quality assurance.</p><p>&bull; Practical knowledge transfer and on-the-job support to EFL and PPU personnel.</p><p>5. Key Deliverables</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:480px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:182px\"><p><strong>Timeline</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S screening notes for all GFPP-financed activities (rolling)</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 1 week of initiation of each activity</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S Risk Register, initial and updated quarterly</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 1 month of mobilization, then quarterly</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Inputs to ESCP</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As directed by World Bank task team</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S Scoping Studies with Critical Habitat Screening</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>ESMP for Component 3, Aging Asset Replacement</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Resettlement Policy Framework</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Negotiated Land Agreement Due Diligence Report(s)</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Stakeholder Engagement Plan, including consultation plan, project GRM and SEA/SH pathway</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Labor Management Procedures</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Procurement-ready TOR and supporting inputs for EFL ESMS assignment</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 3 months of mobilization and in time for procurement</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Advisory notes on Electricity Act amendments and Rooftop Solar PV Policy</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As requested</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S inputs to bidding documents and technical specifications</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As required by procurement schedule</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S technical input notes for infrastructure studies and components</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>According to relevant technical-study schedule</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Monthly E&amp;S progress reports</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Quarterly stakeholder-engagement summaries</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Quarterly</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>ESF capacity-building and on-the-job training program, materials and attendance records</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 2 months of mobilization, then as required</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Disclosure record and consolidated Appraisal-Stage E&amp;S Readiness Summary</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Before appraisal, updated as required</p></td></tr></tbody></table><p><em>All deliverables shall be submitted in English, professionally edited, and formatted in accordance with any World Bank templates provided.</em></p><p>6. Reporting and Coordination</p><p>The E&amp;S Specialist will report to the PPU Project Manager on a day-to-day basis. For technical E&amp;S matters, the Specialist will coordinate closely with World Bank E&amp;S Specialists and participate in World Bank supervision missions and project-preparation meetings.</p><p>The Specialist will also coordinate with:</p><p>&bull; EFL&#39;s full-time Environmental Officer and Social Officer, once recruited;</p><p>&bull; GFPP technical consultants in engineering, energy and finance;</p><p>&bull; iTaukei Land Trust Board on land-tenure and customary-engagement matters;</p><p>&bull; Department of Environment and other relevant Fiji government agencies; and</p><p>&bull; external E&amp;S consultants engaged for specialized studies.</p><p>7. Required Qualifications and Experience</p><p>7.1 Education</p><p>&bull; University degree, at minimum Bachelor&#39;s level, in environmental science, social science, natural-resource management, engineering or a closely related field. A postgraduate qualification in environmental or social assessment is strongly preferred.</p><p>7.2 Professional Experience</p><p>&bull; At least seven years of relevant experience in E&amp;S assessment and management for infrastructure or energy projects.</p><p>&bull; Demonstrated application of the World Bank ESF or IFC Performance Standards and preparation of ESMPs, land or resettlement instruments, SEPs/GRMs and LMPs.</p><p>&bull; Experience in biodiversity and critical-habitat screening, ESS5 land and resettlement due diligence, and ESS7 engagement and FPIC.</p><p>&bull; Experience with hazardous materials, renewable energy, grid infrastructure or power generation is desirable.</p><p>&bull; Pacific or Fiji experience, including familiarity with iTaukei land tenure and governance, is strongly preferred.</p><p>&bull; Strong writing, coordination, consultation and capacity-building skills in multicultural settings.</p><p>8. Duration and Location</p><p>&bull; Duration: Part-time for the full GFPP implementation period, estimated at [24 months], subject to satisfactory performance and GFPP availability.</p><p>&bull; Location: Remote-based, with regular travel to project sites on Vanua Levu, Taveuni and other islands as required for scoping, consultation and supervision.</p>"},{"id":"OP00468827","notice_type":"Request for Expression of Interest","noticedate":"16-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-29T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Fiji","project_id":"P515153","project_name":"Fiji Energy Transformation Project Preparation","bid_reference_no":"FJ-EFL-567207-CS-CQS","bid_description":"Prefeasibility study for selected solar sites, including E&S assessment and risk mitigation","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"2 Marlow Street\nSuva, Fiji","contact_ctry_name":"Fiji","contact_email":"bobbyc@efl.com.fj","contact_name":"Bobby Naimawi","contact_organization":"Energy Fiji Limited","contact_phone_no":"(679) 9992468","contact_web_url":"www.efl.com.fj","submission_date":"2026-09-16T00:00:00Z","notice_text":"<p>EOI 01/2026 for&nbsp;<strong>Pre-Feasibility Study for Ground Mounted Solar PLANT with Battery Energy Storage System at TAVAKUBU in LAUTOKA, NASOLO in BA and YAQARA </strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST &ndash; CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:331px\"><p><strong>Name of Project</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:331px\"><p>Fiji Energy Transformation Project Preparation (P515153)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p><strong>Loan No/Credit No/Grant Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p>GFPP Grant No. TF0D0728</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p>Pre-Feasibility Study for Ground-Mounted Solar PV Plants with Battery Energy Storage Systems at Tavakubu, Nasolo and Yaqara</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p><strong>Procurement Plan Ref Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p>FJ-EFL-567207-CS-CQS</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p><strong>Reference No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p>EOI-01/2026</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p><strong>Country of Delivery</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:331px\"><p>Republic of Fiji</p></td></tr></tbody></table><p>&nbsp;</p><p>The Republic of Fiji, acting through Energy Fiji Limited (EFL), has received financing from the World Bank toward the costs of the Fiji Energy Transformation Project Preparation (P515153), and intends to apply part of the proceeds for the following consulting services.</p><p>The consulting services (&quot;the Services&quot;) comprise a pre-feasibility study for utility-scale ground-mounted solar photovoltaic (PV) plants with battery energy storage systems (BESS) at Tavakubu in Lautoka, Nasolo in Ba, and Yaqara. The assignment will assess site suitability, solar resources, grid readiness, technical configuration, economic viability, environmental and social risks, climate and disaster risks, and project implementation requirements. Following the study, the Technical Advisor will support EFL in preparing technical specifications for procurement of independent power producer arrangements.</p><p><strong>The Services will cover:</strong></p><p><strong>Phase 1</strong> site screening and project definition for all three sites, including demand growth and grid-readiness review, solar-resource and energy-yield assessment, indicative site layouts and single-line diagrams, access, topography, hydrology, climate and disaster risks, environmental and social red-flag screening, preliminary cost estimates, development timeframes, multicriteria ranking and recommendations.</p><p><strong>Phase 2</strong> project preparation for up to two sites selected by EFL, including cadastral, topographic and geotechnical investigations; solar-resource and shading assessment; PV and BESS configuration; energy-yield estimates; static and dynamic grid-impact studies; conceptual interconnection design; cost, revenue and financial sensitivity analysis; environmental and social assessment and management planning; approvals and permitting roadmap; and project development schedules.</p><p><strong>Phase 3</strong> technical support to IPP selection, including technical inputs for RFQ and RFP documents, prequalification and eligibility requirements, technical compliance and responsiveness criteria, and bid-evaluation criteria.</p><p>Preparation of an inception report, project definition report, separate pre-feasibility reports for selected sites, environmental and social outputs, presentations, model and data files, and procurement technical specifications.</p><p><strong>Implementation period: </strong>the assignment is expected to be completed within six (6) months from contract execution and issue of the commencement notice.</p><p><strong>Terms of Reference: </strong>The detailed Terms of Reference are attached to this REOI as Appendix 1 and may also be made available through EFL&rsquo;s procurement portals.</p><p>Energy Fiji Limited now invites eligible consulting firms (&quot;Consultants&quot;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p>The attention of interested Consultants is drawn to paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, latest applicable edition, setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>EOI Evaluation Criteria</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#2e74b5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:331px\"><p><strong>Criterion</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:331px\"><p><strong>Weight</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:331px\"><p>1. General experience of the firm in renewable-energy, power-system and infrastructure advisory assignments</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:331px\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:331px\"><p>2. Relevant experience in pre-feasibility or feasibility studies and conceptual design for utility-scale solar PV projects incorporating BESS</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:331px\"><p>40%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:331px\"><p>3. Relevant experience in island grids, grid integration, transmission interconnection, environmental and social safeguards, and climate/disaster risk assessment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:331px\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:331px\"><p>4. Relevant experience in preparing technical specifications, procurement strategies and/or bidding documents for solar PV, BESS or comparable power-sector investments</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:331px\"><p>20%</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:331px\"><p><strong>Total</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:331px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Form and content of the Expression of Interest</strong></p><p>Expressions of interest should not exceed 10 pages, excluding annexes, and should contain only the information necessary to assess the criteria set out above. Consultants are not required to submit technical proposals, methodologies, work plans, staffing schedules, CVs of experts, or financial proposals at this stage. In accordance with the Regulations, the qualifications and experience of Key Experts do not form part of this evaluation, and any such material submitted will not be evaluated.</p><p>Consultants may associate with other firms to enhance their qualifications but shall indicate clearly whether the association takes the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all members shall be jointly and severally liable, and the lead member shall be identified.</p><p>The firm assessed as best qualified against the above criteria will be invited to submit a technical and financial proposal and to negotiate a contract in accordance with the applicable Procurement Regulations.</p><p><strong>Submission</strong><br />Further information can be obtained by emailing to tenders@efl.com.fj during office hours&nbsp;8:00 AM to 4:30 PM (Fiji Time), Monday to Friday clear 3 days from the closing date of this EOI.</p><p>Expressions of interest must be&nbsp;uploaded to the EFL e-Tender Portal (TenderLink)&nbsp;at&nbsp;https://www.tenderlink.com/efl(opens in new window), by registering your company, by&nbsp;4:00 PM (1600 hrs) Fiji Time on Wednesday 30th September 2026.</p><p>Tender documents may be viewed and downloaded from&nbsp;www.efl.com.fj(opens in new window)&nbsp;or&nbsp;https://www.tenderlink.com/efl(opens in new window).</p><p><strong>Submissions by email or facsimile will not be accepted and will be deemed null and void. Hard copy submissions to the tender box at EFL Head Office, Suva, will not be accepted.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><br />Appendix 1 &ndash; Terms of Reference</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ENERGY FIJI LIMITED</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Terms of reference</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Pre-Feasibility Study for Ground Mounted Solar PLANT with Battery Energy Storage System at TAVAKUBU in LAUTOKA, NASOLO in BA and YAQARA </strong></p><p><strong>&nbsp;</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li>Definitions</li></ol><p>&nbsp;</p><p>RFP&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Request for Proposals</p><p>TOR&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Terms of reference for the works</p><p>Tenderer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The company or consortia that is providing a submission in response to this RFP document</p><p>EFL&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Energy Fiji Limited, 2 Marlow Street, Suva, Fiji</p><p>Works&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Project, Assignment</p><p>PV&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Photo Voltaic</p><p>CBA&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cost Benefit Analysis</p><p>BESS&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Battery Energy Storage system</p><p>WB&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; World Bank</p><p>ESS&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Environment &amp; Social Standards</p><p>AACEI&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Association for the Advancement of Cost Engineering International</p><p>IFC&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; International Finance Corporation</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>Table of contents</u></strong></p><p>&nbsp;</p><p><strong>1&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions. 2</strong></p><p><strong>2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Introduction and Background.. 5</strong></p><p>2.1&nbsp;&nbsp;&nbsp;&nbsp; About Energy Fiji Limited. 5</p><p>2.2&nbsp;&nbsp;&nbsp;&nbsp; Project Background and Overview. 5</p><p>2.3&nbsp;&nbsp;&nbsp;&nbsp; Objective of this Assignment 6</p><p><strong>3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Work.. 6</strong></p><p>3.1&nbsp;&nbsp;&nbsp;&nbsp; Phase 1: Site Screening and Project Definition. 6</p><p>3.2&nbsp;&nbsp;&nbsp;&nbsp; Phase 2: Project Preparation. 7</p><p>3.3&nbsp;&nbsp;&nbsp;&nbsp; Phase 3: Procurement Specifications Support 8</p><p><strong>4&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Deliverables. 8</strong></p><p>4.1&nbsp;&nbsp;&nbsp;&nbsp; Inception Report 9</p><p>4.2&nbsp;&nbsp;&nbsp;&nbsp; Project Definition Report 9</p><p>4.3&nbsp;&nbsp;&nbsp;&nbsp; Pre-Feasibility Report, including Environmental and Social Outputs. 9</p><p>4.4&nbsp;&nbsp;&nbsp;&nbsp; Procurement Technical Specifications. 9</p><p><strong>5&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Supervision and Reporting.. 9</strong></p><p><strong>6&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Expertise and Qualification.. 9</strong></p><p>6.1&nbsp;&nbsp;&nbsp;&nbsp; Similar Project Experience. 9</p><p>6.2&nbsp;&nbsp;&nbsp;&nbsp; Staff Qualification and Experience. 10</p><p>6.3&nbsp;&nbsp;&nbsp;&nbsp; Other Qualification Areas. 11</p><p><em>6.3.1&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Minimum Team-Level Qualifications. 11</em></p><p><em>6.3.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; FS-Critical Competencies. 11</em></p><p><em>6.3.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Submission Requirements. 12</em></p><p><strong>7&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payment Schedules and Terms. 12</strong></p><p><strong>8&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inputs and Facilities Provided by EFL. 12</strong></p><p><strong>Annexure A: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Site LocationS. 13</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li>Introduction and Background<ol><li>About Energy Fiji Limited</li></ol></li></ol><p>Energy Fiji Limited (&ldquo;EFL&rdquo;) is a public company limited by shares that was established under the Companies Act (2015), Laws of Fiji. It is supervised by a Board of Directors comprising a Chairman and representatives of its shareholders. Its major shareholders include the Fijian Government and Sevens Pacific Pte. Limited.</p><p>&nbsp;</p><p>The Executive Management team of EFL consists of the Chief Executive Officer, Deputy Chief Executive Officer, Chief Operating Officer, Chief Finance Officer, General Manager Human Resources, General Manager Generation, General Manager Network, General Manager Customer Services, General Manager System Planning and Control, General Manager Special Projects and Chief Information Officer.</p><p>&nbsp;</p><p>EFL is primarily responsible for generation, transmission and distribution of electricity in Viti Levu, Vanua Levu, Ovalau and Taveuni in Fiji. It owns over twenty (20) power stations and twenty (20) substations and switching stations on the islands of Viti Levu, Vanua Levu, Taveuni and Ovalau. EFL owns, operates and maintains a network of 147km of 132kV transmission lines, 576km of 33kV lines and over 11,200km of 11kV and 415V distribution lines, as at 31st December 2025. It also has over 227,000 customer accounts as at 31st December 2025, made up of domestic, institutional, commercial and industrial customers.</p><p>&nbsp;</p><p>EFL has embarked upon an ambitious program of development in order to fulfil its strategic objectives. These include development of new generating and power system projects as well as improving reliability and capacity-building for future load growth. EFL plans to increase the generation capacity of Fiji in order to meet continuing demand growth and intends that this additional capacity will be provided by renewable or at least non-polluting resources.&nbsp;</p><ol><li><ol><li>Project Background and Overview</li></ol></li></ol><p>Fiji utilizes a diverse array of energy sources, including hydro, diesel, wood, and petroleum products, to fulfill its energy needs. EFL is the primary provider of grid-based power to approximately 90% of the population on the main islands of Viti Levu, Vanua Levu, Taveuni and Ovalau. EFL aims to supply at least 90% of its energy requirements through renewable sources by 2035. Having a dependable and high-quality supply of electricity is crucial for driving economic growth. Lack of access to electricity not only diminishes the quality of life but also deprives people from essential services like healthcare, agriculture, education etc.</p><p>&nbsp;</p><p>EFL is undertaking the development of a utility-scale ground-mounted solar PV power at the identified sites in Viti Levu. This study aims to delve into the key components of a pre-feasibility study for ground mounted solar PV project with BESS at these sites, focusing on technical and economic analyses. Additionally, it will assess other essential considerations such as environmental, and social aspects in alignment with the IFC Performance Standards, emphasizing their importance for the success and long-term sustainability of the project. Upon completion of the pre-feasibility study, the Technical Advisor is required to assist in preparation of procurement documentation by preparing technical specifications that will be used by EFL for preparing the procurement documentation to select an independent power producer (IPP). The project may subsequently be prepared to be developed through public-private partnership.</p><p>&nbsp;</p><p>This project supports Fiji&rsquo;s National Development Plan target of achieving 100% grid-connected renewable electricity generation by 2035 and EFL&rsquo;s corporate goal of sourcing more than 90% of its energy from renewable sources by 2035. The installation will enhance grid stability, reduce reliance on fossil fuels, and contribute to sustainable economic growth.</p><p>&nbsp;</p><ol><li><ol><li>Objective of this Assignment</li></ol></li></ol><p>The objective of this solar feasibility study is to determine the practicality and economic viability of installing solar photovoltaic system with battery energy storage system at the proposed sites by evaluating solar resources, technical requirements, financial performance, environmental benefits, and potential risks, and to provide recommendations for project implementation.</p><p>&nbsp;</p><ol><li>Scope of Work</li></ol><p>EFL has identified &nbsp;three (3) sites which they intend to develop for solar PV power plant with BESS. Annexure A &nbsp;shows these &nbsp;three sites, and these are legally described as follows:</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:576px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:23px; width:151px\"><p><strong>Lease or Title Document Reference</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:23px; width:227px\"><p><strong>Legal description of Land.</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:23px; width:198px\"><p><strong>Area (Indicative, subject to survey)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:151px\"><p>LD4/1/40687</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:227px\"><p>Nasolo - Ba</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:198px\"><p>101 Acres</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:151px\"><p>SO5189 and SO5188</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:227px\"><p>Veniu Subdivision - Yaqara</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:198px\"><p>600 Acres</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:151px\"><p>TLC &ndash; Tokatoka Navitua</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:227px\"><p>Lot 38 -Tavakubu</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:198px\"><p>200 Acres (out of 600 acres under existing lease)</p></td></tr></tbody></table><p>&nbsp;</p><p>EFL would like to procure the services of a Technical Advisor which will be the firm with a qualified team of multi-disciplinary experts comprising international and national consultants for the provision of the scope of work enumerated below. The Technical Advisor will work closely with and directly support EFL for the Project.</p><p>&nbsp;</p><p>The Technical Advisor shall carry out the work as per the scope mentioned in this section. For carrying out this project, the Technical Advisor shall draw a detailed action plan which need to be presented during the project inception meeting to be held with EFL.&nbsp;</p><p>&nbsp;</p><p>The feasibility shall be completed in Six (6) months from the execution of Contract and issue of commencement notice.</p><p>&nbsp;</p><p>The scope of work will be follows as a minimum, but not limited to:</p><ol><li><ol><li>Phase 1: Site Screening and Project Definition</li></ol></li></ol><p>The Technical Advisor shall conduct initial site assessment to screen the gross area of the three sites based on secondary data available, information collected from stakeholders, data analysis (as required for GIS-based assessment of the sites using satellite imagery available):</p><p>&nbsp;</p><ol><li>Demand forecast review for solar energy needs, and grid readiness assessment (including grid availability, access to transmission infrastructure, possible augmentation needs);</li></ol><p>&nbsp;</p><ol><li>Site suitability analysis covering but not limited to:</li></ol><ol><li>Solar energy resource assessment including hourly, monthly and annual energy yield estimation,</li><li>Indicative site layouts and concept single line diagram</li><li>Access road availability</li><li>Topographical, geographical, and hydrological features;</li><li>Disaster risk including earthquake, flood and cyclone and climate change risk assessment;</li></ol><p>&nbsp;</p><ol><li>Recommendation on the possibility of including Battery Energy Storage Systems (BESS) covering capacity/size (to meet the project needs requirements only, for the project to operate as a round-the-clock dispatchable unit), design, technology and location, and its impact to the need of grid connection capacity.</li></ol><p>&nbsp;</p><ol><li>Preliminary analysis of potential social and environmental safeguards risks, in line with National regulations and the IFC Performance Standards and climate change risk vulnerability assessment (red flag report) and prepare a preliminary stakeholder map and key considerations.</li></ol><p>&nbsp;</p><ol><li>Preparation of preliminary cost estimates (AACEI Level 5 equivalent, capturing (Capex) and operating expenses (Opex)) for respective solar PV plant and accompanying transmission infrastructure including the need for control and communication infrastructure upgrades, etc..</li></ol><p>&nbsp;</p><ol><li>Prepare a shortlist of candidate sites based on Phase 1 outcomes, summarizing key site conditions, technical, environmental, and social risks and impacts, and provide recommendation on key next steps for further development, including gaps of project preparation.</li></ol><p>&nbsp;</p><ol><li>Indicative development timeframe for each site, based on accessibility, scale of development and grid readiness, and other key considerations affecting development timeframe.</li></ol><p>&nbsp;</p><ol><li>Site ranking for the identified three project sites using a multi-criterion assessment framework factoring technical, environmental, and social safeguard considerations, and indicative development timeframe, and provide recommendations for further development.</li></ol><p>&nbsp;</p><ol><li><ol><li>Phase 2: Project Preparation</li></ol></li></ol><p>Based on the results of Phase 1, EFL will select sites for further development. If there are no sites are deemed viable, the consultancy assignment will not continue.</p><p>&nbsp;</p><p>For the selected sites, the Technical Advisor shall prepare a comprehensive feasibility study covering the ground mounted solar plant, BESS, transmission interconnection and transmission line as outlined above. It will consist among others engineering, financial, social and environmental due-diligence adhering to the World Banks ESS Standards and analysis of proposed site and develop an optimal solution.</p><p>&nbsp;</p><p>The feasibility study report should cover all requirements identified by EFL and mentioned in any relevant laws and regulations as applicable to energy projects in Fiji, and should include the following:</p><ol><li>A detailed report on project site and boundary area and approximated site plan, design and layout of the ground mounted solar facility. The report will also cover the right of way analysis for various civil works, transmission lines, among other technical aspects.</li><li>Study and survey of water resource availability, geology, meteorology, earthquake and seismic risks, hydrology, and flood risks. Site surveys shall include cadastral and topographic surveys (for contours levels of 2metres or less), and Auto-CAD version of site surveys shall be shared with the deliverables.</li><li>Conduct geotechnical investigations based on AS 1726, with one borehole per hectare for at least a depth of 5 metres for field investigations, and laboratory testing based on AS 1289.</li><li>Conduct solar resource assessment (including irradiation studies) using satellite and ground-measured solar resource assessment.</li><li>Options for placement and arrangement of solar panels and other equipment configuration, including inverters, mounting platforms, transformers etc. and other electrical, electromechanical, auxiliary and protection, control, and monitoring systems that are part of a ground mounted solar PV system.</li><li>Shading analysis including near and far shading.</li><li>Estimate energy yields. The energy yield should include an assessment of the inter-annual variation and yield confidence levels, and electrical losses from the influence of temperature variances on the efficiency of the plant, and include consideration of site-specific factors, including soiling or rain, and the cleaning regime.</li><li>Grid impact and readiness study: conduct static and dynamic grid impact study, and discuss the need for any augmentation needed to accommodate for plant variability, and related costs and curtailment rate.</li><li>Based on the preliminary study of BESS use in Phase I and the discussion with EFL, the Technical Advisor will study the use of BESS system based on the specifications of the solar RE and the grid impact assessment. The study will cover the capacity, design, location, other technical specifications of the BESS system.</li><li>Single line diagram including conceptual interconnection design.</li><li>The cost estimates for development, construction (civil works, right of way) and operations of the solar project, BESS (if applicable) and predicted revenue, based on the available resource data, as well as indicative quotes or comparison with similar projects.</li><li>Input technical assumptions for the financial model and run sensitivity studies to identify range of feed-in tariff and acceptable rate of returns.</li><li>Conduct social and environmental safeguard assessment in line with National regulations and the IFC Performance Standards, including land acquisition and livelihood impacts, biodiversity and habitat risks, indigenous peoples&rsquo; rights, cultural heritage, community health and safety, and stakeholder engagement. Develop an environmental and social assessment and management plan, clear roadmap of required approvals, permits, and mitigation measures to ensure compliance and sustainability. The cost of the implementation of the environmental and social assessment and management plan should be included.</li><li>Develop project development schedule for each selected site based on the findings of the feasibility study and assessments.</li><li>Provide inputs and work with others who may be appointed by the Client (EFL) to prepare the grid augmentation aspects of the works.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Phase 3: Technical Support to IPP Selection</li></ol></li></ol><p>Contingent on EFL&rsquo;s decision, the Technical Advisor will assist EFL for the implementation of the selection of the IPP by providing inputs on technical aspects of the Pre-qualification, and Request for Proposal (RFP) and Request for Bid (RFB) processes.</p><p>&nbsp;</p><p>The detailed inputs would include the following:</p><ol><li>All equipment specifications</li><li>Tentative Design and Construction details</li><li>Installation procedures/recommendations for project developers</li><li>Commissioning tests and processes of the project, including but not limited to formats of certificates</li><li>Performance Parameters, Guarantees and Schedules</li><li>Commercial performance guarantees</li></ol><p>&nbsp;</p><p><strong>Other Tasks and Responsibilities:</strong></p><p>In addition to the above scope of work, the Technical Advisor shall liaise and cooperate, as necessary and throughout the assignment, with other consultants engaged by EFL for the study. All deliverables and key outputs will be developed in English and submitted in soft copies to EFL. Key members of the consulting firm/(s) shall have the ability to conduct meetings and discussions in English.</p><p>&nbsp;</p><p>The Technical Advisor shall prepare highlights and/or minutes of all relevant major meetings and other</p><p>consultations.</p><p>&nbsp;</p><p><strong>The Client would retain the right to: a) decide the number of projects that would proceed from phase 1 to phase 2 (project preparation) and b) implement or not Phase 3 activities.</strong></p><p>&nbsp;</p><ol><li>Deliverables</li></ol><p>The Technical Advisor shall provide the following deliverables:</p><p>&nbsp;</p><ul><li><ol><li>Inception Report</li></ol></li><li>Finalized workplan and schedule (milestones, review meetings), data request list, study methodology outline (including software/tools and versions), and stakeholder engagement plan(as applicable).</li><li>Finalized project implementation schedule (Gantt chart) covering Phase 1 and Phase 2 activities, key milestones, dependencies, review points, and required inputs from EFL.</li><li>Format: PDF + editable (Word/Excel).</li><li>Submission: within 1 week of commencement</li></ul><p>&nbsp;</p><ul><li><ol><li>Project Definition Report</li></ol></li><li>Covers all work under Sub-Clause 3.1 (Phase 1: Site Screening and Project Definition)</li><li>Where software/tools are used (e.g., solar resource assessment), include generated outputs.</li><li>Format: PDF + editable; Excel calculation files; GIS package (site boundary, constraints, layout files).</li><li>Submission: within 8 weeks of commencement, with key findings presentation to EFL</li></ul><p>&nbsp;</p><ul><li><ol><li>Pre-Feasibility Report, including Environmental and Social Outputs</li></ol></li><li>Covers all work under Sub-Clause 3.2 (Phase 2: Project Preparation)</li><li>Environmental and Social Assessment and Management Plans &ndash; ESIA and ESMP</li><li>Models and data: study case files (e.g., PSS&reg;E/DIgSILENT/ETAP&mdash;version stated), network and load/generation data, contingencies list, protection/limits inputs, and scenario files (as applicable and available).</li><li>Format: PDF + editable report; native model files in agreed tool; data dictionary.</li><li>Submission: within 18 weeks of commencement, to be submitted as separate reports for each site, with in-person presentation to EFL</li></ul><p>&nbsp;</p><ul><li><ol><li>Procurement Technical Specifications (Phase 3: Technical Support to IPP Selection)</li></ol></li><li>Include all technical sections derived from Sub-Clause 3.1and 3.2 for incorporation into the procurement/bidding documents to be compiled/prepared by others</li><li>Format: PDF + editable (Word/Excel).</li><li>Submission: within 24 weeks of commencement. To be submitted as separate package for each site.</li></ul><p>&nbsp;</p><ol><li>Supervision and Reporting</li></ol><p>The Project Owner is the Chief Executive Officer - EFL. The Technical Advisor will report to and coordinate with General Manager Special Projects of EFL for various project related components and delivery.</p><p>&nbsp;</p><ol><li>Expertise and Qualification</li></ol><p>The Bidders themselves or with their Joint Venture partners should have previous experience and expertise in Review and Vetting, and /or feasibility stage Design &amp; Engineering of at least seven solar PV power plant projects with BESS in last 7 years.</p><p>&nbsp;</p><ol><li><ol><li>Similar Project Experience</li></ol></li><li>The Bidder shall demonstrate experience as a Technical Advisor / Owner&rsquo;s Engineer / Consultant in the feasibility or pre-feasibility stage of at least seven solar PV power plant projects incorporating BESS, with a total cumulative PV capacity of not less than 250MW, completed or substantially completed within the last seven years from date of closing of this tender, and currently in operation.</li><li>The relevant FS-stage experience shall demonstrate technical scope and complexity comparable to the activities described in Scope of Work.</li><li>At least one referenced project shall demonstrate experience in a Pacific island country or a similar island environment, highlighting familiarity with island-grid operation, logistics constraints, and climate-related risks.</li></ol><p>&nbsp;</p><ol><li><ol><li>Staff Qualification and Experience</li></ol></li></ol><p>The Bidder must have as a minimum, qualified and experienced key staff in the following areas:</p><p>&nbsp;</p><ul><li>Project Management &amp; Coordination</li></ul><ol><li>Project Manager with demonstrated experience in managing solar PV projects with integrated BESS, both regionally and internationally</li><li>Demonstrated experience of the Project Manager and key staff in handling FIDIC contract conditions, particularly for EPC tender preparation and evaluation.</li><li>Strong leadership capability to coordinate multidisciplinary teams including engineers, specialists and relevant stakeholders (such as government agencies and utilities).</li><li>Expertise in project risk management, scheduling and tracking (e.g., Primavera P6 / MS Project), and overall project governance.</li></ol><p>&nbsp;</p><ul><li>Technical Experts</li></ul><ol><li>Solar Resource &amp; Energy Yield Analysis Expert, proficient in PVsyst or equivalent tools, with experience in developing energy yield assessments for large-scale solar PV projects.</li><li>BESS Sizing &amp; Techno-Economic Optimization Specialist, experienced in modelling tools such as HOMER, REopt, or equivalent.</li><li>Electrical Engineers with demonstrated experience in solar PV and BESS system design at feasibility and conceptual design levels.</li><li>Power System Study Engineer, experienced in load flow, short-circuit, stability analysis, and grid integration studies.</li><li>Power System Protection &amp; Control Engineer, familiar with protection philosophy, relay coordination, and integration with BESS control system.</li><li>Communications &amp; SCADA/Control System Engineer, experienced in utility-scale PV/BESS monitoring, control, and communications architectures.</li><li>High Voltage Substation &amp; Transmission Conceptual Design Engineer, capable of developing FS-level substation, switching station, and transmission line concepts.</li><li>Power Station Conceptual Design Engineer, experienced in preliminary plant layout, electrical balance of plant, and integration of PV+BESS systems.</li><li>Civil/Structural Engineer experienced in site assessment and conceptual civil design for PV and BESS facilities.</li><li>Geology &amp; Geotechnical Engineer to perform desktop geotechnical assessment and site feasibility analysis.</li></ol><p>&nbsp;</p><ul><li>Financial &amp; Regulatory Experts</li></ul><ol><li>Financial Modelling &amp; Economic Analysis Expert with experience in renewable energy and BESS project.</li><li>Regulatory &amp; Permitting Specialist with understanding of environmental permitting requirements and international BESS safety standards.</li></ol><p>&nbsp;</p><ul><li>Environmental &amp; Social Specialists</li></ul><ol><li>Environmental &amp; Social Safeguard Expert(s), experienced in IFC Performance Standards and relevant national environmental and social regulations.</li><li>Land &amp; Site Assessment Specialist with capability to assess land suitability, hydrology, flood risk, and land use constraints for large-scale solar PV projects.</li></ol><p>&nbsp;</p><p>All identified Key Staff and their Curriculum Vitae (CV) should be included in the bid submission.</p><p>&nbsp;</p><ol><li><ol><li><ol><li>Minimum Team-Level Qualifications</li></ol></li></ol></li><li>Degree-qualified engineers in relevant disciplines, with FS/conceptual design experience for large-scale PV + BESS.</li><li>Experience thresholds (Key Experts):</li></ol><ul><li>15 years or more of experience for the Team Leader / Project Manager.</li><li>8 &ndash; 10 years or more of experience for Discipline Leads / Key Specialists.</li><li>3 &ndash; 5 years or more of experience for Supporting staff working under the supervision of Key Experts.</li></ul><ol><li>Standards and codes: Working knowledge of Australian/New Zealand standards, IEC for PV/BESS, IEEE for grid interconnection (as applicable), and applicable Fijian standards, grid codes and environmental requirements.</li><li>Context familiarity (advantageous): Prior individual experience of Key Experts in Fiji/Oceania (contractors, supply chains, logistics) and knowledge of Fiji&rsquo;s regulatory and permitting processes.</li><li>Language: Fluency in English (verbal and written).<ol><li><ol><li>FS-Critical Competencies</li></ol></li></ol></li></ol><ol><li>Feasibility-level technical review &amp; conceptual design, including plant layout concepts and integration of PV, BESS and grid interconnection.</li><li>Energy yield &amp; sizing methods appropriate to FS stage, and ability to justify key assumptions and loss factors.</li><li>Power system study scoping suitable for FS stage (e.g., load flow / short-circuit and stability screening to inform interconnection feasibility and grid code compliance pathways).</li><li>HSE for PV + BESS at concept stage, including hazard identification (e.g., thermal runaway/fire) and alignment with relevant codes and local authority requirements.<ol><li><ol><li>Submission Requirements</li></ol></li></ol></li></ol><ol><li>Project organization chart with man-month allocations by phase and role.</li><li>List of Key Experts with CVs indicating roles, years of experience, representative assignments, and time commitment to this project.</li><li>CVs of Team Leader and Project Manager and other key management personnel.</li><li>CVs of supporting personnel with reporting lines to Key Experts.</li><li>Resourcing plan with expected man-days per workstream</li><li>Quality Management System, with brief description of document control, internal review/verification, and risk management.</li><li>Access to supplementary local expertise and partnerships, including local consulting firms or subcontractors with knowledge of Fijian land regulations, permitting processes, and other local requirements.</li></ol><ol><li>Payment Schedules and Terms</li></ol><p>The Consultant will be expected to provide the main deliverables in accordance with the following timetable.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:42px\"><p>No.</p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:390px\"><p>Deliverable</p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:110px\"><p>Duration (after commencement of each Phase)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1-1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p>Inception Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:110px\"><p>1 week</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1-2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p>Submission of the project definition report with all the deliverables listed in the scope of work and presentation to EFL of key findings (Phase 1: Site Screening and Project Definition)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:110px\"><p>8 weeks</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1-3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p>Submission of final feasibility report incorporating input from EFL and other stakeholders (Phase 2: Project Preparation)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:110px\"><p>18 weeks</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1-4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p>Presentation of findings and recommendations to stakeholders, transportation authorities, funding agencies and potential project investors</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:110px\"><p>19 weeks</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1.5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p>Preparation of technical specifications document for inclusion in development RFT with all mandatory preliminary design for tendering (Phase 3: Technical Support to IPP Selection)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:110px\"><p>24 weeks</p></td></tr></tbody></table><p>&nbsp;</p><p>The Technical Advisor should quote a lump sum value inclusive of all expenses for delivering the services under the Terms of Reference. In addition, the Technical Advisor is required to provide phase wise cost breakup of the lump sum value of the contract.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#156082; border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:425px\"><p><strong>Phase/ Deliverable&nbsp;</strong></p></td><td style=\"background-color:#156082; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:175px\"><p><strong>% of the lump sum value</strong></p></td></tr><tr><td style=\"background-color:#c1e4f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Phase 1: Site Screening and Project Definition</p></td><td style=\"background-color:#c1e4f5; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Phase 2: Project Preparation (breakdown by site)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><ol><li>Nasolo, Ba</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><ol><li>Tavakubu, Lautoka</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><ol><li>Yaqara, Tavua</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:#c1e4f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Phase 3: Technical Support to IPP Selection</p></td><td style=\"background-color:#c1e4f5; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:175px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>Payments shall be made upon verification and formal acceptance of deliverables linked to defined project milestones. No advance payment will be made. All pricing shall be inclusive of applicable taxes.</p><p>&nbsp;</p><p>For offshore services, payments will be made net-off for applicable Withholding Tax under Fiji&#39;s Income Tax Act. Bidders must clearly indicate the WHT amount applicable in their price schedules.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li>Inputs and Facilities Provided by EFL</li></ol><p>EFL will provide the following:</p><ul><li>Existing EFL system data;</li><li>Access to the sites and relevant data and information</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Annexure A: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Site LocationS</p><p>&nbsp;</p><p>Figure 1: Site Boundary Details, Nasolo, Ba</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Figure 2: Site Boundary Details &ndash; Tavakubu, Lautoka</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Figure 3: Site Layout Details &ndash; Yaqara, Tavua</p><p>&nbsp;</p><p>Figure 4: Site Layout Details &ndash; Yaqara, Tavua</p>"},{"id":"OP00469387","notice_type":"Request for Expression of Interest","noticedate":"16-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-30T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Fiji","project_id":"P515153","project_name":"Fiji Energy Transformation Project Preparation","bid_reference_no":"FJ-EFL-567212-CS-CQS","bid_description":"Scoping of Ageing Assets Upgrade for power network and hydropower, and procurement preparation for power network","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"2 Marlow Street\nSuva, Fiji","contact_ctry_name":"Fiji","contact_email":"bobbyc@efl.com.fj","contact_name":"Bobby Naimawi","contact_organization":"Energy Fiji Limited","contact_phone_no":"(679) 9992468","contact_web_url":"www.efl.com.fj","submission_date":"2026-09-16T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST - CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:206px\"><p><strong>Name of Project</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:418px\"><p>Fiji Energy Transformation Project Preparation (P515153)</p></td></tr></thead><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Loan No/Credit No/Grant Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>GFPP Grant No. TF0D0728</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>Consultancy Services for Replacement of Ageing Assets (Generation and Power Network)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Procurement Plan Ref Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>FJ-EFL-567212-CS-CQS</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Reference No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>EOI-03/2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Country of Delivery</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>Republic of Fiji</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:206px\"><p><strong>Selection Method</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:418px\"><p>Consultant&rsquo;s Qualifications Based Selection (CQS)</p></td></tr></tbody></table><p>&nbsp;</p><p>The Republic of Fiji, acting through Energy Fiji Limited (EFL), intends to engage a qualified consulting firm to support the preparation and implementation of an Aged Asset Replacement Program covering selected hydropower generation and power network assets.</p><p>The consulting services (&quot;the Services&quot;) comprise the development of an Aged Asset Replacement Policy and Plan, identification and prioritisation of replacement projects, environmental and social screening and assessment, preparation of an implementation and procurement framework, and development of procurement documentation for the first batch of priority investments.</p><p><strong>The Services will cover:</strong></p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Review of EFL&rsquo;s existing aged asset replacement policies and procedures, including risk evaluation and recommended improvements.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Stakeholder consultations and preparation of a stakeholder engagement plan aligned with applicable environmental and social requirements.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Development of a new Aged Asset Replacement Policy consistent with Good International Industry Practice and the World Bank Environmental and Social Framework.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Assessment of the Wainiqeu and Nagado hydropower stations and the identified network substations, switchboards, transformers and related assets.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Project identification, prioritisation, cost estimates, economic analysis, environmental and social screening, risk classification and preparation of proportionate management instruments.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Development of a procurement strategy, technical specifications, bills of quantity and draft bidding documents, including relevant environmental and social provisions.</p><p><strong>&bull;&nbsp;&nbsp;&nbsp; </strong>Knowledge transfer and training for relevant EFL personnel, together with a final implementation roadmap and recommendations.</p><p>&nbsp;</p><p><strong>Implementation period: The assignment is expected to be completed within thirty (30) weeks from the date of contract signing.</strong></p><p>&nbsp;</p><p><strong>Terms of Reference: The detailed Terms of Reference are attached to this REOI as Appendix 1.</strong></p><p>Energy Fiji Limited now invites eligible consulting firms (&quot;Consultants&quot;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p>Consultants may associate with other firms to enhance their qualifications and should clearly indicate whether the association is a joint venture and/or a sub-consultancy. Any actual or potential conflict of interest must be disclosed at the time of submission and throughout the assignment.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>EOI Evaluation Criteria</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#2e74b5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:53px\"><p><strong>No.</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:494px\"><p><strong>Technical Evaluation Criteria - Aged Asset Replacement</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:77px\"><p><strong>Weighting</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>Understanding of Terms of Reference</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p><strong>10</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>Qualifications and Experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p><strong>65</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>- Team Composition (CVs), Assignment, Key Expert inputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p>(55)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>- Environmental, Social, Health and Safety</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p>(10)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>Description of Approach, Methodology and Work Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p><strong>20</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><ul><li>Technical Approach, Methodology, and Organization of the Consultant&rsquo;s team</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p>(15)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><ul><li>Work Schedule and Planning for Deliverables</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p>(5)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:53px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:494px\"><p>Knowledge Transfer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:77px\"><p><strong>5</strong></p></td></tr></tbody></table><p><em>Mandatory Compliance: Demonstration of adherence to timelines set in Section 4 of the ToR.</em></p><p>&nbsp;</p><p><strong>Submission</strong></p><p><strong>Submission</strong></p><p>Further information can be obtained by emailing to tenders@efl.com.fj during office hours&nbsp;8:00 AM to 4:30 PM (Fiji Time), Monday to Friday clear 3 days from the closing date of this EOI.</p><p>&nbsp;</p><p>Expressions of interest must be&nbsp;uploaded to the EFL e-Tender Portal (TenderLink)&nbsp;at&nbsp;https://www.tenderlink.com/efl(opens in new window), by registering your company, by&nbsp;4:00 PM (1600 hrs) Fiji Time on Wednesday, 30th September 2026.</p><p>&nbsp;</p><p>Tender documents may be viewed and downloaded from&nbsp;www.efl.com.fj(opens in new window)&nbsp;or&nbsp;https://www.tenderlink.com/efl(opens in new window).</p><p>&nbsp;</p><p><strong>Submissions by email or facsimile will not be accepted and will be deemed null and void. Hard copy submissions to the tender box at EFL Head Office, Suva, will not be accepted.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 1 - Terms of Reference</strong></p><p><br />&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p>Terms of Reference</p><p>Aged Asset Replacement</p><p>&nbsp;</p><p>Generation and Power Network</p><p>&nbsp;</p><p>EOI-03/2026</p></td></tr></tbody></table><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p>ENERGY FIJI LIMITED</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>Contents</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp; Background and Context 1</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp; Objective of the Assignment 1</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp; Scope of Work. 2</p><p>Task 1: Review of the Existing Aged Asset Replacement Policies/Procedures. 6</p><p>Task 2: Stakeholder Consultations. 6</p><p>Task 3: Development of a new Aged Asset Replacement Policy. 6</p><p>Task 4: Project Identification. 6</p><p>Task 5: Develop Procurement Strategy and Bidding Documents. 7</p><p>Task 6: Final Report and Recommendations. 7</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp; Deliverables. 7</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp; Evaluation Criteria. 7</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp; Required Qualifications and Expertise. 8</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp; Institutional Arrangements. 9</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp; Duration. 9</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp; Reporting. 10</p><p>10.&nbsp; Ethical Standards and Conflict of Interest 10</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Terms of Reference</p><p>Consultancy Services for Replacement of Ageing Assets</p><p>&nbsp;</p><ol><li>Background and Context</li></ol><p>Fiji&#39;s energy sector plays a central role in the economic development, investment in climate resilience renewable energy projects, and ensure long-term sustainability of the Fijian Economy. The country&#39;s electricity supply is dominated by Energy Fiji Limited (EFL), a majority owned government utility responsible for the generation, transmission, distribution, and retail of electricity. EFL currently produces approximately 93 percent of electricity, with Independent Power Producers (IPPs) contributing the remaining balance.</p><p>EFL is the primary electricity provider in Fiji, responsible for the generation, transmission, and retail of electricity across the four (4) main islands of Viti Levu, Vanua Levu, Ovalau and Taveuni. Formerly known as the Fiji Electricity Authority (FEA) which was established under the Electricity Act in 1966, it was corporatized in 2018 to operate as a public company limited by shares.</p><p>&nbsp;</p><p>Some of EFL&rsquo;s major power generation assets (Renewable/thermal) have gone past their useful or replacement life due to their old age. The age of these generation assets is over 20 years or more. Some generators have long been out of production with spare parts no longer available or have become obsolete.</p><p>EFL has over the years worked on a number of projects to replace its ageing assets in both the Generation and Network Areas. Some were funded through debt funding and the remaining through EFL&rsquo;s internal cashflow with progress subject to availability of funds.</p><p>The Government of Fiji (GoF), supported by the World Bank under the proposed Fiji Energy Transformation Project, is committed to assisting Energy Fiji Limited (EFL) in the implementation of EFL&rsquo;s Aged Asset Replacement program, and the Grant Facility for Project Preparation (GFPP) is used to support this ageing assets screening and preparation.</p><p>&nbsp;</p><ol><li>Objective of the Assignment</li></ol><p>The primary objectives of this consultancy are to:</p><ol><li>Develop an Aged Asset Replacement policy for EFL, aligned with the World Bank&rsquo;s Environmental and Social Standards (ESS);</li><li>Establish an Aged Asset Replacement Plan; and</li><li>Develop a framework for the implementation/procurement of the Aged Asset Replacement Plan in an efficient, cost-effective and transparent manner, aligned with the World Bank&rsquo;s ESS.</li></ol><p>The Aged Asset Replacement Policy should address the following:</p><ol><li>Facilitate broad interest in the implementation/procurement of the Aged Asset Replacement plan;</li><li>Establish clear, transparent, and competitive procurement processes for the implementation of the Aged Asset Replacement Plan;</li><li>Promote energy security and affordability for all Fijian consumers.</li><li>Promote Good International Industry Practices (GIIP) in terms of environmental sustainability and social safeguards.</li></ol><p>Specifically, the Consultancy should address the following:</p><ol><li>Identify ageing assets to be replaced or rehabilitated. A list is provided, with detailed information below.</li><li>Promote energy-efficient replacement technologies</li><li>Conduct a comprehensive E &amp; S risk screening and assessment, including the corresponding mitigation measures / management plans, for all identified generation and substation upgrade, covering hazardous material handling, recovery (likelihood ACM in the switchboards, PCB and SF6 in the transformers etc.), waste disposal, emissions, and community impacts.</li><li>Investment needs, and cost benefits analysis</li><li>Facilitate broad interest in the implementation/procurement of the Aged Asset Replacement plan;</li><li>Proposed implementation plan, including procurement packaging</li><li>Draft bidding documents, BoQ and Technical Specifications, or other procurement documents.</li><li>Promote energy security and affordability for all Fijian consumers including community safety awareness, emergency preparedness, and communication strategies to inform residents of planned outages or risks.</li></ol><p>&nbsp;</p><ol><li>Scope of Work</li></ol><p>The aged assets include both aged hydropower stations and power network.</p><p>Two hydropower power stations are proposed to be assessed:</p><ol><li>Wainiqeu Hydro Power Station: Upgrade of Power Station and Equipment. Rehabilitate Penstock pipeline, weir and headpond</li><li>Nagado Hydro Power Station: Upgrade of Power Station and Equipment. Rehabilitate Penstock pipeline, weir and headpond</li></ol><p>Regarding power network, following EFL Substation Locations are included:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:604px\"><thead><tr><td style=\"background-color:#caedfb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:34px\"><p><strong>No.</strong></p></td><td style=\"background-color:#caedfb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:145px\"><p><strong>Location and Equipment to be Replaced</strong></p></td><td style=\"background-color:#caedfb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:208px\"><p><strong>Risks</strong></p></td><td style=\"background-color:#caedfb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:170px\"><p><strong>Benefits</strong></p></td><td style=\"background-color:#caedfb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:47px\"><p><strong>Stage</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Suva Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 50 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Suva CBD without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Suva CBD for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Vatuwaqa Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 27 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Suva CBD without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Suva CBD for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Hibiscus Park Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 50 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Walu Bay industrial area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Walu Bay industrial area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Kinoya Substation no. 1: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 26 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Kinoya/Laucala Beach/Nasinu area without electricity for a duration of 12 &ndash; 18 months. It will also result in our inability to connect the Kinoya Power Station no. 1 generation to the grid.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Kinoya/Laucala Beach/Nasinu area for a duration of 12 &ndash; 18 months, and the loss of Kinoya Power Station no. 1 generation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Kinoya Substation no. 1: Replacement of&nbsp; 15/18MVA, 11kV/33kV Transformer T3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure mode, and no longer has operational reliability. Failure of this transformer will result in loss of 15MVA of generation connectivity to the grid.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of the loss of 15MVA generation connectivity to the grid.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Sawani Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 50 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Sawani area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Sawani area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Korovou Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 27 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Tailevu/Korovou/Naitasiri area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Tailevu/Korovou/Naitasiri area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Wailekutu Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 50 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Lami/Wailekutu/Naboro area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Lami/Wailekutu/Naboro area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Wailoa Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in customers in the Wailoa area being without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to customers in the Wailoa area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Wailoa Substation: Replacement of 33kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in loss of Wainikasou generation, and loss of supply to customers in the Wailoa area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of generation from Wainikasou power station, and the loss of electricity supply to customers in the Wailoa area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>11</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Wailoa Substation: Replacement of 0.5MVA, 33kV/11kV transformer T6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure mode, and no longer has operational reliability. Loss of transformer will result in customers in the Wailoa area being without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to customers in the Wailoa area.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Savusavu Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 38 years old, operating in its failure zone and no longer has operational reliability. Loss of the switchboard will result in loss of electricity supply to the Savusavu area for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to the Savusavu area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>13</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>FSC Labasa substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 25 years old, operating in its failure zone and no longer has operational reliability. Loss of the switchboard will result in loss of electricity supply to FSC Labasa, and part of the Labasa area for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to FSC Labasa and part of the Labasa area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>14</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Levuka Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 25 years old, operating in its failure zone and no longer has operational reliability. Loss of the switchboard will result in loss of electricity supply to customers in Ovalau for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to Ovalau for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Vuda Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 24 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Lautoka/Nadi area without electricity for a duration of 12 &ndash; 18 months. It will also result in our inability to connect the Vuda Power Station no. 1 generation to the grid.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Lautoka/Nadi area for a duration of 12 &ndash; 18 months, and the loss of Vuda Power Station no. 1 generation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>16</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Pineapple Corner Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Lautoka area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Lautoka area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>17</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Pineapple Corner Substation: Replacement of 11kV/0.415kV Auxiliary Transformers T1 and T2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 35 years old, operating in its failure zone and no longer has operational reliability. Loss of the auxiliary transformers will result in loss of AC supply to the substation, including the Protection and SCADA battery chargers. Loss of supply to the Protection system will disable the protection which will then fail to operate on fault, and could potentially cause catastrophic damage to the switchboards</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to the substation, including the Protection and SCADA battery chargers.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>18</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Lautoka Switching Station: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 31 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Lautoka area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Lautoka area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>19</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Tavua Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 31 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in the Tavua area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to the Tavua area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Waqadra Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 28 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in significant part of the Nadi area without electricity for a duration of 12 &ndash; 18 months.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to part of the Nadi area for a duration of 12 &ndash; 18 months</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>21</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Rakiraki Substation: Replacement of 11kV Switchboard</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 29 years old, operating in its failure zone and no longer has operational reliability. Loss of switchboard will result in the Rakiraki area being without electricity for a duration of 12 &ndash; 18 months. It will also result in our inability to connect the Rakiraki generation to the grid.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to the Rakiraki area for a duration of 12 &ndash; 18 months, and the loss of Rakiraki generation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>22</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Rakiraki Substation: Replacement of 11kV/0.415kV Auxiliary Earthing Transformer T1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Equipment is 51 years old, operating in its failure zone and no longer has operational reliability. Loss of the auxiliary earthing transformers will result in loss of AC supply to the substation, including the Protection and SCADA battery chargers. Loss of supply to the Protection system will disable the protection which will then fail to operate on fault, and could potentially cause catastrophic damage to the switchboards. Loss of earthing will result in loss of earthfault protection at the power station.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will result in the elimination of the risk of loss of electricity supply to the substation, including the Protection and SCADA battery chargers. It will also eliminate the risk of loss of earthfault protection at the power station.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>23</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Coordinate site visits by EFL Network Engineers to electricity utilities in the Australia/New Zealand and South/East Asia region to observe how aged asset replacement is planned and implemented.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Risks - poor understanding of the management of aged assets resulting in delays in the implementation of the replacement program and priorities &ndash; will result in asset failure, customer outages and unplanned replacement costs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will help build and strengthen internal capacity among EFL Engineers on how to address aged assets.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:34px\"><p>24</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>Establish relationships with electricity utilities in the Australia/New Zealand and South/East Asia region to allow for short-term (3 weeks) attachment by EFL Network Engineers to the various utilities to observe network maintenance practices.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:208px\"><p>Risks &ndash; absence of exposure to work practices by advanced utilities in the region. Loss of knowledge sharing opportunities. Failure to learn and adopt proven work methodologies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>This investment will help build and strengthen internal capacity among EFL Engineers on how to improve management and maintenance of Network assets.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td></tr></tbody></table><p>&nbsp;</p><p>The Consultant will carry out the following tasks for above two hydropower stations and power network:</p><p>Task 1: Review of the Existing Aged Asset Replacement Policies/Procedures</p><ul><li>Review current policy/procedure for EFL Aged Asset Replacement.</li><li>Risk evaluation of asset replacement projects, including impacts on air, water, waste, and community health, and propose measures for policy improvement.</li></ul><p>Task 2: Stakeholder Consultations</p><ul><li>Prepare a stakeholder engagement plan in accordance with ESS requirements.</li><li>Review current policy/procedures for EFL Aged Asset Replacement with Generation Department and EFL&rsquo;s Environment &amp; Social Safeguard specialists to ensure community safety assessments, emergency preparedness plans, and communication strategies are incorporated in the policy together with effective grievance redress mechanisms for affected stakeholders.</li><li>Meet with relevant Network Managers and Engineers to review current policy/procedures for Aged Asset Replacement.</li></ul><p>Task 3: Development of a new Aged Asset Replacement Policy</p><ul><li>Develop a new Aged Asset Replacement Policy in line with Good International Industry Practice (GIIP) to include safe disposal, recycling, and pollution prevention measures, and recommend use of energy-efficient technologies in new assets, in consultation with the concerned Departments (Generation, Network) &nbsp;and EFL&rsquo;s Environment &amp; Social Safeguard specialists.</li></ul><p>Task 4: Project Identification</p><ul><li>Work with EFL to update list of projects targeted for implementation under the Aged Asset Replacement program.</li><li>To establish which projects can be undertaken as part of the Fiji Energy Transformation Project.</li><li>Work with EFL to prioritize the projects approved to be undertaken under the Fiji Energy Transformation Project.</li><li>E&amp;S screening and risk classification for the selected projects. See annex for more details.</li><li>Cost estimates and economic analysis</li></ul><p>Task 5: Environmental and Social Assessment and Management</p><p>Building on the E&amp;S screening conducted under Task 4, the Consultant shall undertake Environmental and Social (E&amp;S) assessments and prepare the corresponding management instruments for the sub-projects identified for the implementation under the Aged Asset Replacement Program. All assessments and instruments shall comply with the World Bank&#39;s Environmental and Social Framework (ESF), applicable national environmental legislation of Fiji (including the Environment Management Act 2005 and associated regulations), and Good International Industry Practice (GIIP). More details are provided in the annex.</p><p>Task 6: Develop Procurement Strategy and Bidding Documents</p><ul><li>Liaise with both EFL and MoF to develop procurement strategy to replace the identified aged assets.</li><li>Draft the bidding documents for the first batch of ageing assets to be replaced, mainly bills of quantity and technical specifications, including relevant E&amp;S provisions.</li><li>Conduct training of relevant EFL personnel on the World Bank Procurement Regulations for IPF Borrowers.</li></ul><p>Task 7: Final Report and Recommendations</p><ul><li>Prepare a comprehensive final report consolidating all findings, the stakeholder consultation process, the proposed Aged Asset Replacement Policy and an Aged Asset Replacement implementation roadmap.</li><li>Present findings and recommendations to the relevant stakeholders.</li></ul><p>&nbsp;</p><ol><li>Deliverables</li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:95.84%\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:8%\"><p><strong>No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:68%\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:22%\"><p><strong>Indicative Timeline</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:68%\"><p>Inception Report, including methodology, workplan, and stakeholder engagement plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\"><p>Week 4-7</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:8%\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:68%\"><p>Review of the Existing Aged Asset Replacement Policies/Procedures (Task 1), Develop Procurement Strategy and Bidding Documents (Task 6)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\"><p>Week 8-14</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:8%\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:68%\"><p>Stakeholder Consultations (Task 2), Drafting of a new Aged Asset Replacement Policy (Task 3), Project Identification (Task 4), E&amp;S Deliverables (Task 5), Develop Procurement Strategy and Bidding Documents (Task 6)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\"><p>Week 15-25</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:8%\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:68%\"><p>Draft Report: Hydro Power Station and Network Assets (with Grid analysis)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\"><p>Week 26-28</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:8%\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:68%\"><p>Final Separate Reports and Implementation Roadmap for:</p><ol><li>Network</li><li>Wainiqeu and Nagado Hydro Power Stations</li><li>E&amp;S assessment</li></ol><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\"><p>Week 29-30</p></td></tr></tbody></table><p>&nbsp;</p><p>All deliverables shall be submitted in English. Draft deliverables will be reviewed by the World Bank and relevant stakeholders, and the Consultant will be expected to incorporate feedback within an agreed timeframe.</p><p>&nbsp;</p><ol><li>Required Qualifications and Expertise</li></ol><p>The Consultant shall require a team with a combination of project management, contract management, and energy sector expertise. The core team should include:</p><p>Team Leader / Project Manager</p><ul><li>Bachelor&rsquo;s degree in Engineering, Project Management or equivalent (advanced degree preferred).</li><li>Minimum 15 years of professional experience in power sector projects.</li><li>At least 8 years in a senior project management / team leadership role for power system aged asset replacement projects.</li><li>Practical experience administering consultancy or EPC contracts under the World Bank&rsquo;s Standard Procurement Documents.</li><li>Demonstrated experience managing multidisciplinary teams and interfacing with Owners, EPC Contractors, utilities and regulators.</li><li>Strong reporting, coordination and communication skills in English.</li></ul><p>&nbsp;</p><p>Electrical Expert</p><ul><li>Bachelor&rsquo;s degree in Electrical Engineering (Power Generation Systems preferred).</li><li>Minimum 10 years of experience in electrical design review and/or supervision of Power Generation System installation, testing and commissioning works.</li><li>Proven experience with Single-Line Diagrams, Protection and Control systems, Generators, Transformers and Switchgear.</li><li>Demonstrated knowledge of grid codes, system protection and testing requirements.</li><li>Experience with Hydro and Thermal Power Generation systems is desirable.</li></ul><p>&nbsp;</p><p>Mechanical Expert</p><ul><li>Bachelor&rsquo;s degree in Mechanical Engineering.</li><li>Minimum 10 years of experience in Mechanical design review and/or supervision of Power Generation System installation, testing and commissioning works.</li><li>Proven experience with Generator Installation, Commissioning, Operation and Maintenance.</li><li>Demonstrated knowledge of grid codes, system protection and testing requirements.</li><li>Experience with Hydro and Thermal Power Generation systems is desirable.</li></ul><p>&nbsp;</p><p>Civil Expert</p><ul><li>Bachelor&rsquo;s degree in Civil Engineering (or equivalent).</li><li>Minimum 10 years of experience in civil works design review and/or construction supervision for power generation, substation or renewable energy projects.</li><li>Proven experience with earthworks, pipelines, foundations, drainage, access roads and substation civil works.</li></ul><p>&nbsp;</p><p>Environment Expert</p><ul><li>Bachelor&rsquo;s degree in Environmental Science, Environmental Engineering, or related field (Postgraduate qualification preferred).</li><li>Minimum 8 years of experience conducting Environmental Impact Assessments (EIA) and environmental/social monitoring for infrastructure or energy projects.</li><li>Practical experience with permitting and approval processes under environmental regulations.</li><li>Experience in Pacific Island countries or similar jurisdictions will be an advantage.</li></ul><p>&nbsp;</p><p>Gender Social Specialist</p><ul><li>Specialised degree in Gender Studies, Social Science or related field</li><li>Minimum 8 years of experience in managing social and gender related issues on energy projects.</li></ul><p>&nbsp;</p><p>Financial Expert</p><ul><li>Bachelor&rsquo;s degree in Finance, Economics, Engineering or related discipline (professional certification preferred).</li><li>Minimum 8 years of experience in financial analysis, cost estimation or financial modelling for power or infrastructure projects.</li><li>Experience supporting CAPEX/OPEX estimation and tender price evaluations for EPC or consultancy contracts.</li><li>Familiarity with taxation and payment structures for international consultancy services is desirable.</li></ul><p>Procurement Expert</p><ul><li>Bachelor&rsquo;s degree in Engineering, Procurement or related discipline.</li><li>Minimum 8 years of experience in tendering and procurement for infrastructure or power projects.</li><li>Demonstrated experience in preparation and evaluation of RFQ/RFP documents, especially for EPC or turnkey projects.</li><li>Familiarity with international competitive bidding processes.</li><li>Experience with FIDIC-based procurement is an advantage.</li></ul><p>&nbsp;</p><p>Common Requirements</p><ul><li>Ability to work and report professionally in English.</li><li>Familiarity with international standards (IEC, IEEE, AS/NZS) relevant to power and renewable energy projects.</li><li>Experience in the Australia/New Zealand region will be considered as an advantage.</li></ul><p>&nbsp;</p><p>&nbsp;</p><ol><li>Institutional Arrangements</li></ol><p>The Consultant will work under the overall supervision of the Energy Fiji Limited and Ministry of Finance. A Technical Working Group (TWG), comprising representatives from Energy Fiji Limited and the Ministry of Finance will be established to provide guidance, review deliverables, and facilitate stakeholder access. The World Bank may provide technical oversight and quality review in its capacity as a development partner.</p><p>&nbsp;</p><ol><li>Duration</li></ol><p>The assignment is expected to be completed within 30 weeks from the date of contract signing.</p><p>&nbsp;</p><ol><li>Reporting</li></ol><p>The Consultant will report to the designated focal point at Energy Fiji Limited and will provide regular progress updates to the TWG. All deliverables are subject to formal review and written approval by Energy Fiji Limited before being considered final.</p><p>&nbsp;</p><ol><li>Input provided by EFL</li></ol><p>EFL will provide asset registers, condition and outage data, existing policies and drawings, licences and consent conditions for visiting the hydro and other project sites, counterpart staff, office space, site access and safety induction, and who bears in-country travel.</p><p>&nbsp;</p><ol><li>Ethical Standards and Conflict of Interest</li></ol><p>The Consultant must disclose any actual or potential conflicts of interest at the time of proposal submission and throughout the duration of the assignment. Any firm or individual with a direct commercial interest in the Fiji electricity sector may be subject to additional scrutiny or disqualification.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex. E&amp;S Screening, Risk Classification, and E&amp;S Assessment and Management</strong></p><p>&nbsp;</p><p><strong>E&amp;S Screening and Risk Classification</strong></p><p>As part of the project identification and prioritization process, the Consultant shall conduct an Environmental and Social (E&amp;S) screening of all assets and sub-projects identified for potential inclusion under the Aged Asset Replacement Program. The purpose of this screening is to identify, at an early stage, the nature and significance of potential environmental and social risks and impacts associated with each sub-project, and to classify them accordingly to inform prioritization and downstream assessment requirements under Task 5.</p><p>The E&amp;S screening shall be carried out in accordance with the World Bank&#39;s Environmental and Social Framework (ESF) and shall include the following activities:</p><p><strong>(a) Screening Checklist Development.</strong>&nbsp;The Consultant shall develop a standardized E&amp;S screening checklist, to be reviewed and approved by EFL and the World Bank, covering the following parameters for each sub-project or asset replacement activity:</p><ul><li>Nature, scale, and location of the proposed asset replacement works (e.g., generation assets, transmission and distribution infrastructure, substations, switchboards, transformers, and hydropower plant components);</li><li>Proximity to environmentally sensitive areas, including watercourses, riparian zones, protected areas, forests, and ecologically significant habitats;</li><li>Proximity to communities, settlements, sacred sites, and areas of cultural heritage significance;</li><li>Land access requirements, including temporary or permanent land acquisition, easements, or restrictions on land use;</li><li>Potential for generation of hazardous waste, including oils, asbestos-containing materials (ACM), SF6 gas, polychlorinated biphenyls (PCBs), and other legacy contaminants associated with aging electrical infrastructure;</li><li>Potential for impacts on labor and working conditions, occupational health and safety, and community health and safety during works; and</li><li>Potential for disproportionate impacts on vulnerable or marginalized groups, including women, youth, and indigenous communities.</li></ul><p><strong>(b) Application of the Screening Checklist.</strong>&nbsp;The Consultant shall apply the approved screening checklist to each sub-project or asset cluster identified in Task 4, drawing on available data, site reconnaissance findings, and stakeholder inputs gathered under Task 2. For hydropower-related asset replacements, the screening shall additionally assess:</p><ul><li>The potential for works to alter water release regimes, turbine operations, or intake structures in ways that may affect downstream river flows, including environmental flows (eflows);</li><li>Potential impacts on aquatic ecosystems, freshwater biodiversity, and ecosystem services dependent on river flows; and</li><li>Any associated civil works within or adjacent to river corridors, including intake structures, penstocks, tailraces, and powerhouses.</li></ul><p><strong>(c) E&amp;S Risk Classification.</strong>&nbsp;Based on the screening outcomes, the Consultant shall assign each sub-project or asset replacement activity a preliminary E&amp;S risk classification consistent with the World Bank ESF risk categories (High, Substantial, Moderate, or Low). The classification shall consider both the type and scale of potential impacts and the sensitivity of the receiving environment and social context.</p><p><strong>(d) Screening Report.</strong>&nbsp;The Consultant shall prepare an E&amp;S Screening Report summarizing the results of the screening exercise for all sub-projects. The report shall include, for each sub-project: the completed screening checklist, the preliminary E&amp;S risk classification, the rationale for the classification, and recommended E&amp;S assessment and management measures required under Task 5. The Screening Report shall form an input to the Project Identification deliverable and shall be shared with EFL, the Ministry of Finance, and the World Bank for review and clearance prior to finalization.</p><p>The outcomes of the E&amp;S screening shall directly inform the selection and sequencing of sub-projects for the first batch of implementation, ensuring that sub-projects with manageable E&amp;S risks are prioritized, and that appropriate assessment and management measures are in place before procurement commences.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Environmental and Social Assessment and Management</strong></p><p>Building on the E&amp;S screening conducted under Task 4, the Consultant shall undertake Environmental and Social (E&amp;S) assessments and prepare the corresponding management instruments for the sub-projects identified for the implementation under the Aged Asset Replacement Program. All assessments and instruments shall comply with the World Bank&#39;s Environmental and Social Framework (ESF), applicable national environmental legislation of Fiji (including the Environment Management Act 2005 and associated regulations), and Good International Industry Practice (GIIP).</p><ol><li><ol><li><strong>Scope and Approach</strong></li></ol></li></ol><p>The E&amp;S assessment shall cover all sub-projects in the first batch, as identified and screened under Task 4, including but not limited to:</p><ul><li>Replacement of aged switchboards, transformers, and associated substation equipment across EFL&#39;s network;</li><li>Rehabilitation or replacement of generation assets at EFL&#39;s hydropower stations as identified under in the main text; and</li><li>Any associated civil, structural, or access works.</li></ul><p>The scale and depth of assessment shall be proportionate to the E&amp;S risk classification assigned to each sub-project under Task 4.</p><p>&nbsp;</p><ol><li><ol><li><strong>Environmental and Social Assessment &mdash; Hydropower Asset Replacement</strong></li></ol></li></ol><p>For asset replacement activities at hydropower stations, the Consultant shall prepare a standalone E&amp;S assessment addressing the specific environmental and social sensitivities associated with hydropower infrastructure. The ESIA shall be prepared by qualified environmental and social specialists and shall include, at minimum, the following components:</p><p>&nbsp;</p><p><strong>(a) Description of the Existing Environment and Baseline Conditions</strong></p><p>The Consultant shall compile and, where necessary, supplement existing baseline data to characterize the environmental and social baseline for each hydropower site and its area of influence, including:</p><ul><li>Hydrology and water resources: river flow regimes, seasonal variability, historical discharge data, and existing water abstractions or diversions;</li><li>Aquatic ecology: species composition, abundance, and distribution of freshwater fish, macroinvertebrates, and other aquatic biota in rivers upstream and downstream of each facility;</li><li>Riparian and terrestrial ecology: vegetation communities, wildlife habitats, and any protected or endemic species in the project area;</li><li>Water quality: existing water quality conditions in receiving waterbodies;</li><li>Ecosystem services: identification and characterization of ecosystem services provided by river systems and dependent on flow regimes, including provisioning services (fisheries, water supply for downstream communities and agriculture), regulating services (flood attenuation, water purification), and cultural services (recreational, spiritual, and cultural values associated with rivers); and</li><li>Social baseline: communities and livelihoods dependent on river resources downstream of each facility, including subsistence fishing, smallholder irrigation, and cultural or ceremonial uses of water.</li></ul><p>&nbsp;</p><p><strong>(b) Environmental Flow (E-Flow) Assessment</strong></p><p>Given the small scale of the hydropower facility, the Consultant shall conduct a proportionate desktop E-flow review rather than a full E-flow assessment study. The review shall be commensurate with the nature of the asset replacement works and the associated level of hydrological risk.</p><p>The desktop review shall:</p><ul><li>Document the existing operational flow regime at the facility, including any minimum flow release requirements specified in the facility&#39;s existing operating licence, consent conditions, or EFL operational procedures;</li><li>Confirm whether the proposed asset replacement works involve any physical changes to the intake structure, diversion weir, penstock, or tailrace that could alter the volume, timing, or continuity of water diverted or released &mdash; and if no such changes are proposed, note this explicitly as a basis for scoping out a detailed E-flow assessment;</li><li>Apply a simple hydrological desktop method &mdash; such as the Tennant (Montana) Method using available mean annual flow data &mdash; to provide a reference check on whether existing minimum flow releases at the facility are broadly consistent with accepted thresholds for maintaining basic ecological functions in the downstream river reach; and</li><li>Based on the above, conclude either that: (i) existing minimum flow provisions are adequate and no additional E-flow measures are required; or (ii) a gap exists that warrants a specific operational protocol or condition to be incorporated into the ESMP.</li></ul><p>&nbsp;</p><p><strong>(c) Impact Assessment</strong></p><p>The Consultant shall identify, predict, and evaluate the significance of potential environmental and social impacts associated with hydropower asset replacement works, covering both the construction and operational phases. Key impact pathways to be assessed shall include:</p><ul><li>Changes to downstream flow regimes during works (e.g., dewatering, cofferdam installation, temporary flow diversion) and their effects on aquatic habitats, species, and ecosystem services;</li><li>Alteration of sediment transport and geomorphic processes resulting from changes to turbine operation or intake structures;</li><li>Impacts on aquatic biodiversity, particularly fish passage and migration, arising from works at intake or tailrace structures;</li><li>Risks of water quality degradation from construction activities, including turbidity, sedimentation, and potential release of oils, lubricants, or hazardous materials;</li><li>Hazardous waste generation and management, including oils, asbestos-containing materials, PCBs, SF6 gas, and other materials associated with aged electrical and mechanical equipment;</li><li>Community health and safety risks</li><li>Impacts on downstream communities dependent on river-based livelihoods and ecosystem services.</li></ul><p>&nbsp;</p><ol><li><ol><li><strong>Environmental and Social Management Plans (ESMPs)</strong></li></ol></li></ol><p>The Consultant shall prepare ESMPs for each sub-project in the first batch, integrating findings from the E&amp;S assessment (for hydropower facilities) and the E&amp;S screening assessments. The ESMPs shall:</p><ul><li>Describe, for each identified impact, the proposed hierarchy of mitigation measures (avoidance, minimization, mitigation, and compensation or offset where residual impacts remain);</li><li>Include specific management measures for: hazardous waste handling and disposal (oils, ACM, PCBs, SF6); erosion and sediment control during civil works; hydropower operational protocols to maintain E-flows during construction phases; worker health and safety; community health and safety;</li><li>Specify monitoring requirements, including parameters to be monitored, monitoring locations, frequency, responsible parties, and reporting arrangements, with particular attention to downstream aquatic ecology and water quality monitoring at hydropower sites;</li><li>Define institutional responsibilities for ESMP implementation, supervision, and reporting within EFL;</li><li>Include a Grievance Redress Mechanism (GRM) consistent with World Bank ESF requirements, covering all project-affected communities; and</li><li>Include an estimated budget for ESMP implementation.</li></ul><p>&nbsp;</p><ol><li><ol><li><strong>Stakeholder Engagement and Disclosure</strong></li></ol></li></ol><p>In coordination with Task 2, the Consultant shall support EFL in conducting targeted stakeholder consultations on the E&amp;S assessment and ESMP findings for each sub-project. Consultations shall be conducted in accordance with the Stakeholder Engagement Plan developed under Task 2, and shall be culturally appropriate and accessible to women, indigenous communities, and other vulnerable groups. Consultation records, including attendance, issues raised, and responses, shall be documented and appended to the ESIA and ESMP.</p><p>&nbsp;</p><ol><li><ol><li><strong>Integration of E&amp;S Requirements into Bidding Documents</strong></li></ol></li></ol><p>The Consultant shall work closely with the procurement specialist engaged for Task 6 to ensure that all relevant E&amp;S requirements are systematically integrated into the bidding documents for the asset replacement sub-projects. This shall include:</p><p><strong>(a) E&amp;S Specifications and Requirements.</strong>&nbsp;The Consultant shall prepare an Environmental and Social Requirements (ESR) section to be included within the bidding documents for each contract package, covering: Contractor obligations with respect to ESMP implementation, including preparation and submission of a Contractor Environmental and Social Management Plan (C-ESMP) prior to commencement of works; specific technical requirements for hazardous waste management (oils, ACM, PCBs, SF6, and other hazardous materials from aged equipment), including approved disposal or recycling methods, handling procedures, and documentation requirements;</p><p><strong>(b) E&amp;S Performance Standards in Contract Conditions.</strong>&nbsp;The Consultant shall recommend appropriate contract conditions and performance standards to ensure contractor compliance with E&amp;S requirements, including provisions for: submission and approval of the C-ESMP as a condition precedent to commencement of works; regular E&amp;S reporting by the contractor;&nbsp; and consequences for non-compliance, including stop-work orders and financial remedies.</p><p><strong>(c) E&amp;S Rated Criteria.</strong>&nbsp;The Consultant shall recommend criteria for evaluating contractor E&amp;S capacity and performance as part of the qualification and evaluation criteria for each bidding package, covering contractor experience with E&amp;S management on similar infrastructure projects, availability of qualified E&amp;S personnel, and approach to hazardous materials management.</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00465082","notice_type":"Request for Expression of Interest","noticedate":"15-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-02T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P181237","project_name":"Strengthening Public Financial Management II Project","bid_reference_no":"FM-DOFA-563818-CS-INDV","bid_description":"HRD Advisor","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"FSM National Government PO Box PS 158 Palikir Pohnpei 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"osbert.atusaasiire@dofa.gov.fm","contact_name":"Osbert Atusaasiire","contact_organization":"Department of Finance and Administration","contact_phone_no":"920-2280","contact_web_url":"fsmsofa@mail.fm","submission_date":"2026-09-15T00:00:00Z","notice_text":"<p><strong>FEDERATED STATES OF MICRONESIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:688px\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:197px\"><p>Country</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:491px\"><p>Federated States of Micronesia</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Project</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>Project for Strengthening Public Financial Management II (P181237)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Project Implementing Agency / Client</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>Department of Finance and Administration (DOFA)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Assignment Title</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>Human Resource Development and Change Management Advisor</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>Open International</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Contract Type</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>Time Based &nbsp;</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Reference No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>FM-DOFA-563818-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Credit/Grant No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>IDA-E4120</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Date of Issue</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>September 1, 2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:197px\"><p>Deadline for Submission</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:491px\"><p>October 2, 2026</p></td></tr></tbody></table><p>&nbsp;</p><p>The Government of The Federated States of Micronesia (FSM) has received financing from the World Bank toward the cost of the Strengthening Public Financial Management II Project (P181237) and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include providing full-time technical advisory support to the implementation of <strong>Component 3 Enhanced Human Resource Capacity, Communications and Change Management</strong> of the PFM II Project, including:</p><ul><li><strong>Subcomponent 3.1: Human Resource Capacity Development</strong>, focusing on competency development, skills and training needs assessments, professional development and certification programmes, training partnerships, workforce development, knowledge retention, and institutional capacity strengthening; and</li><li><strong>Subcomponent 3.2: Communications and Change Management</strong>, focusing on FMIS change management, organizational readiness, stakeholder communication, citizen engagement, communication of PFM reforms, and coordination of related transparency activities.</li></ul><p>The Human Resource Development and Change Management Advisor will support the Government of FSM in operationalizing existing human resource development, capacity development, training, change management, FMIS adoption, stakeholder communication and citizen engagement strategies and frameworks developed under the Project.</p><p>The assignment will be based in Palikir, Pohnpei, Federated States of Micronesia, with travel to the four State Governments as required. The assignment is expected to be full-time for twenty-four (24) months, with an anticipated start date as soon as possible, subject to completion of the selection and contracting process.</p><p>The detailed Terms of Reference (TOR) for the assignment can be found at the Department of Finance and Administration website:<strong> </strong><strong>https://dofa.gov.fm</strong>, as part of this REOI, or can be obtained at the address given below.</p><p>The Department of Finance and Administration now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (<strong>attach curriculum vitae with description of experience in similar assignments, similar conditions, etc.).</strong></p><p>The criteria for selecting the Consultant are:</p><p><strong>Mandatory&nbsp;Requirements:</strong></p><p>The Consultant shall possess:</p><ol><li>Minimum Master&rsquo;s degree in Human Resource Management, Organizational Development, Public Administration, Change Management, Management, Education, or related field</li><li>Minimum ten (10) years of professional experience in human resource development, organizational development, institutional strengthening, workforce development, or capacity development, preferably in the public sector.</li><li>Minimum five (5) years of experience in change management, competency development, and capacity building/training in public financial management, public sector reform, or development projects;</li></ol><p>&nbsp;</p><p><strong>Desirable</strong>&nbsp;<strong>:</strong></p><ol><li>Experience in developing and implementing competency frameworks, training programmes, professional development and certification programmes;</li><li>Experience in change management and organizational readiness for Financial Management Information Systems (FMIS) or other digital transformation initiatives;</li><li>Demonstrated experience working with government institutions and stakeholders in multidisciplinary and multicultural environments;</li><li>Experience working in Pacific island countries and/or similar remotely located Small Island Developing States (SIDS).</li></ol><p>&nbsp;</p><p>The attention of interested Consultants (including firms) is drawn to <strong>paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Seventh Edition, September 2025</strong> (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>Further information can be obtained at the address below during office hours 08:00 to 17:00 hours, Pohnpei Time.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail only&nbsp;<strong>preferably by 5pm Pohnpei Time, October 2, 2026.</strong></p><p>&nbsp;</p><p>Expressions of Interest must be submitted&nbsp;<strong>by email only</strong>&nbsp;to the following addresses:</p><p>&nbsp;</p><p>Attn: Osbert Atusaasiire<br />Project Manager PFM II</p><p>Department of Finance and Administration</p><p>Palikir, Federated States of Micronesia</p><p>Email: <strong>osbert.atusaasiire@dofa.gov.fm</strong></p><p>And cc to&nbsp;: Arrio Abello, Project Officer, PFM II:<strong> arrio.abello@dofa.gov.fm</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>ANNEX 1: TERMS OF REFERENCE</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:623px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:160px\"><p><strong>Position</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:463px\"><p>Human Resource Development and Change Management Advisor (Individual Consultant)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:160px\"><p><strong>Location:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:463px\"><p>Palikir, Pohnpei, Federated States of Micronesia (with travel to the four State Governments)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:160px\"><p><strong>Duration:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:463px\"><p>Twenty-four (24) months (full-time)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:160px\"><p><strong>Tentative Start Date:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:463px\"><p>As soon as possible</p></td></tr></tbody></table><p><strong>&nbsp;</strong></p><ol><li><strong>BACKGROUND</strong></li></ol><p>The Government of the Federated States of Micronesia (GoFSM), through the Department of Finance and Administration (DoFA), is implementing the World Bank-financed Strengthening Public Financial Management II Project (P181237).</p><p>&nbsp;</p><p>The Project builds on achievements under the previous Public Financial Management Project and aims to strengthen fiscal management practices, improve transparency, expand digital financial management systems, and enhance institutional capacity across the National Government and the four State Governments.</p><p>&nbsp;</p><p>The Project consists of four components:</p><ul><li><strong>Component 1: Improved Fiscal Management Practices and Controls</strong></li><li><strong>Component 2: Expanded Core Financial Management Information Systems (FMIS)</strong></li><li><strong>Component 3: Enhanced Human Resource Capacity, Communications and Change Management</strong></li><li><strong>Component 4: Project Management</strong></li></ul><p>&nbsp;</p><p>Component 3 supports the development of the human and institutional capacity required to sustain PFM reforms, including professional development, organizational change, communication, knowledge transfer, and stakeholder engagement.</p><p>&nbsp;</p><p>During the initial phase of implementation, the previous Human Resource Development (HRD) Advisor developed a number of strategic and institutional tools to guide Component 3 implementation, including:</p><ul><li>Gender-Informed Change Management Strategy;</li><li>Transparency and Citizen Engagement Strategy;</li><li>FMIS Strategy;</li><li>FMIS Training Plan;</li><li>DoFA Competency Framework;</li><li>Capacity development frameworks; and</li><li>Related implementation tools and progress reports.</li></ul><p>The Project has now moved from the strategy development phase into implementation. The Human Resource Development and Change Management Advisor will therefore focus on completing outstanding assessments, operationalizing the existing frameworks, coordinating implementation activities, and supporting measurable progress under Component 3.</p><p>&nbsp;</p><p>The assignment requires a professional with demonstrated experience in human resource development, organizational change, institutional capacity building, training systems, and public sector reform.</p><p>&nbsp;</p><ol><li><strong>OBJECTIVE OF THE ASSIGNMENT</strong></li></ol><p>The objective of the assignment is to support implementation of Component 3 of the PFM II Project by translating existing strategies, frameworks, training plans, and institutional development tools into practical activities that strengthen government capacity to sustain PFM reforms.</p><p>&nbsp;</p><p>The Advisor will support DoFA and State Government counterparts to:</p><ul><li>identify capacity gaps and priority development needs;</li><li>implement professional development and certification programmes;</li><li>support organizational change associated with FMIS and broader PFM reforms;</li><li>establish sustainable training partnerships;</li><li>strengthen workforce capability and knowledge retention; and</li><li>support stakeholder communication and citizen engagement activities related to PFM reforms, and coordinate with relevant technical specialists on related transparency activities;</li></ul><p>&nbsp;</p><p>The Advisor will contribute directly to the achievement of the following Project Results Indicators:</p><p><strong>IR-6:</strong> Number of individuals completing certifications in specialized technical areas and retained within GoFSM, of which at least 50 percent are women.</p><p>&nbsp;</p><p>Priority areas include:</p><ul><li>US GASB Financial Reporting;</li><li>Internal Audit;</li><li>Procurement;</li><li>Budget Management;</li><li>Treasury;</li><li>FMIS-related skills; and</li><li>Other agreed PFM disciplines.</li></ul><p><strong>IR-7:</strong> Increased engagement with citizens on public finances and the role of DoFA.</p><p><strong>IR-8:</strong> Training partnerships established for qualification programmes in specialized public financial management disciplines.</p><p>&nbsp;</p><p>In carrying out these responsibilities, the Advisor will coordinate with the relevant technical specialists, including the Budget Adviser and Procurement Reform Adviser, on transparency and publication activities. The technical preparation, validation, clearance, and publication of fiscal and procurement information will remain the responsibility of the relevant technical specialists and responsible government offices. The Advisor&#39;s role will be to facilitate coordination, stakeholder communication and citizen engagement and to monitor and report relevant progress under Component 3</p><p>&nbsp;</p><ol><li><strong>SCOPE OF SERVICES</strong></li></ol><p>The Advisor will undertake the following workstreams.</p><p><strong>Workstream 1: Professional Capacity Development, Competency Assessment and Certification (IR-6)</strong></p><p>The Advisor will:</p><ul><li>Review and refine the existing DoFA Competency Framework and related capacity development tools prepared under the Project.</li><li>Undertake a Competency Gap Analysis and Skills Audit of key PFM personnel within DoFA and State Treasury functions to identify current capability levels against required competencies.</li><li>Conduct a Training Needs Assessment (TNA) to identify priority technical skills gaps and inform annual professional development programmes.</li><li>Develop competency profiles for selected priority PFM positions, including:<ul><li>FMIS-related roles;</li><li>accounting functions;</li><li>budgeting functions;</li><li>treasury functions;</li><li>procurement functions; and</li><li>internal audit functions.</li></ul></li><li>Support implementation of the approved PFM Training Plan based on identified competency gaps and institutional priorities.</li><li>Coordinate delivery of professional certification programmes in priority areas including:<ul><li>US GASB Financial Reporting;</li><li>Internal Audit;</li><li>Procurement;</li><li>Budget Management;</li><li>Treasury;</li><li>FMIS-related skills; and</li><li>other agreed PFM disciplines.</li></ul></li><li>Support participant selection and training coordination, ensuring equitable access including participation of female staff.</li><li>Monitor completion, retention, and application of acquired skills.</li><li>Maintain certification and training records.</li><li>Report progress against IR-6.</li></ul><p>&nbsp;</p><p><strong>Workstream 2: Training Partnerships and Institutional Sustainability (IR-8)</strong></p><p>The Advisor will:</p><ul><li>Establish and strengthen partnerships with relevant institutions including:<ul><li>College of Micronesia&ndash;FSM (COM-FSM);</li><li>CTEC;</li><li>Office of the National Public Auditor (ONPA);</li><li>professional bodies;</li><li>universities; and</li><li>regional training institutions.</li></ul></li><li>Support development of qualification pathways for public financial management professionals.</li><li>Coordinate partnership arrangements and supporting documentation where required.</li><li>Support delivery of sustainable training programmes that can continue beyond the Project period.</li><li>Monitor and report progress against IR-8.</li></ul><p>&nbsp;</p><p><strong>Workstream 3: FMIS Change Management, Workforce Planning and Organizational Development</strong></p><p>The Advisor will:</p><ul><li>Implement the approved Gender-Informed Change Management Strategy and related FMIS change management activities.</li><li>Support organizational readiness for continued FMIS implementation and stabilization across the National Government and State Governments.</li><li>Undertake workforce assessments for selected PFM functions to identify staffing, role, competency, and organizational requirements arising from FMIS and broader PFM reforms.</li><li>Review existing job descriptions and responsibilities affected by FMIS implementation and recommend updates where required.</li><li>Support DoFA and State Treasuries to align roles, responsibilities, and competency requirements with evolving PFM processes.</li><li>Support application of the DoFA Competency Framework through:<ul><li>recruitment processes;</li><li>staff development;</li><li>performance discussions;</li><li>career development; and</li><li>succession planning.</li></ul></li><li>Support FMIS user adoption through:<ul><li>stakeholder engagement;</li><li>change champion networks;</li><li>communication activities; and</li><li>coordination with technical advisors.</li></ul></li><li>Develop knowledge retention, mentoring, and knowledge transfer approaches to reduce dependence on individual staff members and external consultants.</li><li>Support institutionalization of capacity developed through the Project.</li></ul><p>&nbsp;</p><p><strong>Workstream 4: Citizen Engagement, Stakeholder Communication and Coordination of Transparency Activities (IR-7)</strong></p><p>The Advisor will:</p><ul><li>Support implementation of the Transparency and Citizen Engagement Strategy, with a primary focus on citizen engagement, stakeholder communication and coordination of related activities.</li><li>Coordinate annual citizen engagement activities related to public financial management reforms, including consultations and engagement activities at the National and State Government levels.</li><li>Coordinate with relevant technical specialists, including the Budget Adviser and Procurement Reform Adviser, to support the timely publication of fiscal and procurement documents and information required under the Project Results Framework.</li><li>Support communication activities that improve stakeholder understanding of PFM reforms, public financial information, and the role of DoFA.</li><li>Document stakeholder feedback and coordinate preparation of an annual report summarizing key stakeholder feedback, GoFSM responses, actions taken, lessons learned and recommendations, in accordance with the annual IR-7 targets.</li><li>Facilitate coordination among relevant technical specialists and government offices to ensure that transparency, citizen engagement and communication activities are implemented in a timely and coordinated manner.</li><li>Maintain records of citizen engagement, stakeholder communication and related transparency activities and outputs.</li><li>Monitor and report progress against IR-7 and related annual transparency and citizen engagement targets under the Project Results Framework.</li></ul><p>&nbsp;</p><p>The Advisor will coordinate and facilitate citizen engagement, stakeholder communication and related transparency activities but will not be responsible for the technical preparation, validation, clearance or substantive content of fiscal or procurement information. Responsibility for the preparation and publication of such information will remain with the relevant technical specialists and responsible government offices.</p><p>&nbsp;</p><p><strong>Workstream 5: Component 3 Coordination, Monitoring and Reporting</strong></p><p>The Advisor will:</p><ul><li>Prepare annual Component 3 implementation plans.</li><li>Coordinate implementation of Component 3 activities.</li><li>Maintain Component 3 activity trackers.</li><li>Monitor progress against Project indicators and annual work plans.</li><li>Coordinate with relevant technical specialists to ensure that cross-cutting transparency, citizen engagement and communication activities are aligned with Component 3 priorities and support achievement of the relevant Project Results Framework targets.</li><li>Facilitate coordination between technical specialists responsible for fiscal and procurement information and the relevant communication and citizen engagement activities, as required.</li><li>Prepare monthly and quarterly Component 3 progress reports.</li><li>Participate in PFM II coordination meetings.</li><li>Coordinate closely with:<ul><li>Project Manager;</li><li>FMIS Advisor;</li><li>Budget Advisor;</li><li>Internal Audit Advisor;</li><li>Procurement specialists;</li><li>Finance Consultants; and</li><li>State Government counterparts.</li></ul></li><li>Undertake other related activities assigned by the Secretary of Finance and Administration or Project Manager.</li></ul><p>&nbsp;</p><ol><li><strong>REPORTING ARRANGEMENTS</strong></li></ol><p>The Advisor will work under the overall supervision of the Secretary of Finance and Administration through the Project Manager, PFM II.</p><p>The Advisor will work closely with:</p><ul><li>DoFA Management;</li><li>Project Implementation Unit;</li><li>National Government agencies;</li><li>State Governments;</li><li>PFM II consultants and relevant technical specialists, including the Budget Adviser and Procurement Reform Adviser;;</li><li>Training institutions; and</li><li>Development partners.</li></ul><p>&nbsp;</p><ol><li><strong>DELIVERABLES AND TIMELINES</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:425px\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:198px\"><p><strong>Timing</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Component 3 Implementation Work Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 30 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Competency Gap Analysis and Skills Audit Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 90 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Training Needs Assessment Report and Updated Training Priorities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 120 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Priority PFM Position Competency Profiles</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 6 months</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Training and Professional Development Programme</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Annually</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Workforce Assessment and Job Description Review Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 9 months</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Training Partnership Implementation Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Within 90 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Training and Certification Progress Reports</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Quarterly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>FMIS Change Management Implementation Updates</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Quarterly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Annual Citizen Engagement, Stakeholder Feedback and Communication Report, documenting engagement activities, stakeholder feedback, GoFSM responses and actions taken, communications activities, lessons learned and recommendations</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Annually</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Component 3 Progress Reports</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Quarterly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:425px\"><p>Final Sustainability and Handover Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Final month</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong>PERFORMANCE MEASURES</strong></li></ol><p>Performance will be assessed based on:</p><ul><li>achievement of agreed Component 3 activities;</li><li>quality and timeliness of deliverables;</li><li>completion of competency assessments and training needs analysis;</li><li>progress toward IR-6, IR-7 and IR-8 indicators;</li><li>effectiveness of stakeholder coordination;</li><li>successful implementation of training and capacity development activities;</li><li>contribution to FMIS adoption and organizational change;</li><li>effective coordination with relevant technical specialists to support the timely publication of fiscal and procurement information required under the Project Results Framework;</li><li>successful implementation and documentation of annual citizen engagement and stakeholder communication activities;</li><li>quality and completeness of documentation of stakeholder feedback, GoFSM responses, actions taken, lessons learned and recommendations;</li><li>contribution to achievement of the annual IR-7 targets, including citizen engagement and related communication activities; and</li><li>quality of reporting and documentation.</li></ul><p>&nbsp;</p><ol><li><strong>QUALIFICATIONS AND EXPERIENCE</strong></li></ol><p>The Consultant shall possess:</p><ol><li>A Master&rsquo;s Degree in Human Resource Management, Organizational Development, Public Administration, Change Management, Education, Management, or related discipline.</li><li>Minimum ten (10) years of professional experience in:<ul><li>human resource development;</li><li>organizational development;</li><li>institutional strengthening;</li><li>workforce development;</li><li>change management; or</li><li>capacity development.</li></ul></li></ol><p>The Consultant shall demonstrate experience in:</p><ol><li>competency gap analysis and skills assessments;</li><li>training needs assessments;</li><li>competency-based HR systems;</li><li>workforce planning;</li><li>professional certification programmes;</li><li>institutional capacity development;</li><li>public sector reform programmes; and</li><li>donor-funded governance or PFM projects.</li></ol><p>&nbsp;</p><p>The Consultant should have experience working with multiple government institutions and stakeholders.</p><p>Strong facilitation, communication, analytical, and report-writing skills are required.</p><p>Fluency in English is required.</p><p><strong>Desirable experience includes:</strong></p><ul><li>FMIS or digital transformation programmes;</li><li>World Bank or other donor-funded projects;</li><li>Small Island Developing States;</li><li>federal or decentralized government systems; and</li><li>gender-responsive workforce development.</li><li>Change management experience in similar settings</li></ul><p>&nbsp;</p><ol><li><strong>LOCATION AND DURATION</strong></li></ol><p>The assignment will be a full-time position based in Palikir, Pohnpei, Federated States of Micronesia, with travel to the four State Governments as required.</p><p>&nbsp;</p><p>The Government will provide:</p><ul><li>office accommodation;</li><li>office facilities;</li><li>internet access; and</li><li>access to counterpart staff.</li></ul><p>&nbsp;</p><p>Official travel required for Project implementation will be funded in accordance with applicable Government and Project procedures.</p><p>&nbsp;</p><p>The initial contract duration will be twenty-four (24) months, subject to satisfactory performance, Project requirements, and availability of financing.</p>"},{"id":"OP00460465","notice_type":"Request for Expression of Interest","noticedate":"14-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-21T00:00:00Z","submission_deadline_time":"12:30","project_ctry_name":"Gambia, The","project_id":"P179233","project_name":"The Gambia Resilience, Inclusion, Skills, and Equity Project","bid_reference_no":"GM-CPCU - MOFEA-556550-CS-INDV","bid_description":"Consultancy to develop the National Nutrition Regulation and Guideline for NaNA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ministry of Finance and Economic Affairs","contact_ctry_name":"Gambia, The","contact_email":"ataal@cpcumof.gm","contact_name":"Ndey Anta Taal","contact_organization":"Central Project Coordinating Unit","contact_phone_no":"7004971","submission_date":"2026-09-14T00:00:00Z","notice_text":"<p><strong>Request for Expressions of Interest</strong></p><p>&nbsp;</p><p><strong>Country: </strong>The Republic of the Gambia</p><p><strong>Project Title: </strong>The Gambia Resilience, Inclusion, Skills and Equity Project RISE</p><p><strong>Grant Number: </strong>P1729233</p><p><strong>Assignment Title: </strong>Consultancy to develop the National Nutrition Regulation and Guideline for NaNA</p><p><strong>Procurement Method: </strong>Individual Consultant Selection (INDV)</p><p><strong>Reference No.: GM-CPCU - MOFEA-556550-CS-INDV</strong></p><p>&nbsp;</p><p><strong>Background:</strong></p><p>The Gambia is a small country with a total area of about 10,690 square kilometers.&nbsp; It is surrounded on all sides by the Republic of Senegal, except in the West by the Atlantic Ocean. The population is estimated 2.42 million with a high population growth rate of 3.1 percent per year (Census, 2024). The 2017 Human Development Index shows the country rank at 174 out of 189 countries. Efforts to fight poverty have also proven ineffective with poverty levels remaining unchanged in the past decade (the percentage of households living below the poverty line of 1.25 $/day is 48.65 per cent in 2015 (HIS 2015/2016). The average GDP growth of 3 per cent per annum has barely kept up with population growth of 3.1 per cent. Data from the 2019/20 Demographic Health Survey (DHS) showed encouraging results for U5MR having dropped to 34 per 1,000 down from&nbsp; 54 per 1,000 live births in 2013, Maternal Mortality Ratio estimated 189/100,000 down from at 433/100000 live births in 2013.</p><p>Micronutrient deficiencies are widespread and continue to pose serious public health risks. Anaemia affects 44.8% of children, and only 10.8% of households consume adequately iodized salt even though 77% do consume iodized salt. Vitamin A deficiency affects 18.3% of children under five (MICS 2018). These figures highlight the urgency of interventions such as supplementation, iodization, fortification, and biofortification, supported by regulatory frameworks like the Food Fortification Regulation (2020). Despite these efforts, gaps in coverage and compliance persist, particularly in rural and underserved communities. Strengthening supply chains, enforcement mechanisms, and public awareness campaigns will be essential to improving micronutrient outcomes.</p><p>Infant and young child feeding practices show mixed progress. While 98% of children are breastfed, only 36% of mothers initiate breastfeeding within one hour of birth and 53.6% of children are exclusively breastfed. Complementary feeding remains inadequate, with just 15% of children receiving a minimum acceptable diet. The prevalence of malnutrition has improved with the DHS 2019/20 estimating stunting at 17.5% from 25% in 2013, wasting 5.1% from 12% and underweight 11.6% from 16%. These indicators reflect broader food and nutrition security challenges. The country produces only 50% of its food needs and over half the population (60.2%) do not have enough to meet their food expenditure, according to the Integrated Household Survey (IHS 2022). Climate change, low agricultural productivity, and population growth exacerbate these conditions, prompting national strategies focused on climate-smart agriculture, diversified and increased local food promotion and integration of nutrition into broader development efforts.</p><p>Non-communicable Diseases (NCDs) are on the rise, driven by poor diets, sedentary lifestyles, and urbanization. Hypertension affects 47% of adults, and obesity is significantly higher among women (20.2%) compared to men (3.9%) (WHO STEPS Survey 2019). Only 6.6% of the population meets WHO physical activity guidelines, reflecting lifestyle shifts associated with urbanization, poor dietary habits and sedentary lifestyles. The Fill the Nutrient Gap analysis 2025 shows that only 29% can afford a healthy diet. National responses focus on prevention by adopting appropriate dietary guidelines and lifestyles through social and behaviour change communication, and multisectoral collaboration. However, implementation remains fragmented, and greater investment in community-based prevention and promotion of healthy behaviours is needed.</p><p>As a cross cutting issue, the improvement and implementation of nutrition interventions and programme requires a strong coordination mechanism to avoid duplication and gaps. The National Nutrition Agency (NaNA) was established in 2000 as a semi-autonomous government institution strategically placed under the Office of The Vice President through an Agency Board with the legal mandate to coordinate nutrition and nutrition-related activities and advocate for the mainstreaming of nutrition into the macroeconomic and sectoral policy frameworks, implement nutrition activities, monitor nutrition interventions and programmes, mobilize and manage resources in The Gambia.</p><p>The Agency became a legal entity in 2005 through an Act of the National Assembly (Food Act 2005) which is now repealed and replaced by the Nutrition Act 2024. This ensures effective coordination of nutrition interventions across sectors. The Agency serves as the Secretariat to the National Nutrition Council (an inter-Ministerial body chaired by the Vice President), the country Scaling Up of Nutrition (SUN) Movement and the National Alliance for Food Fortification (NAFF).</p><p>The Agency was charged with the overall coordination and implementation of the policy with the following core mandates:</p><ol><li>Coordination of policy implementation</li><li>Implementation of nutrition activities</li><li>Secretariat of the National Nutrition Council</li><li>Nutrition policy analysis, research and indicative planning</li><li>Monitoring of nutrition interventions and programmes</li><li>Mobilisation, management and coordination of resources</li></ol><p>Following the enactment of the Nutrition Act 2024, there is need to develop a regulation that is critical for establishing and&nbsp; formalising the multisectoral governance structures that ensure food and nutrition security and better help to understand and implement the Nutrition Act 2024. The regulation will also translate political commitment into actionable, accountable and sustainable interventions. To work on the development of a Nutrition Regulation, The Gambia, Resilience, Inclusion, Skills and Equity (RISE) Project&nbsp; has sought the expertise of a Legal Expert for the task.</p><p><strong>Objective of The Assignment:</strong></p><p>The objective of exercise is to review and develop comprehensive nutrition regulation.</p><p><strong>Scope of Work and Key Responsibilities:</strong></p><p>The scope of the work will cover the following:</p><ol><li>Inception meeting to identify areas of focus for the development of the regulation</li><li>Map out which provisions of the Nutrition Act 2024 require secondary legislation particularly focusing on:<ol><li>Establishment of the Nutrition Fund (modalities, management tea composition and areas of usage)</li><li>Reference intake of vitamins and minerals in food sources</li><li>Prescription of fortification mix</li><li>Establishment of fortification coordination platform (NAFF)</li></ol></li><li>Draft a Nutrition Regulation</li><li>Conduct consultative meetings to seek the views of the stakeholders on the new draft Nutrition Regulation</li><li>Incorporate views and comments in the draft Regulation</li><li>Conduct a national validation of the draft regulation</li><li>Facilitate review by the Ministry of Justice</li><li>Finalize the Regulation and submit for approval by the Minister responsible for Nutrition</li></ol><p>The Draftsman will require close collaboration with the NaNA for continued guidance.</p><p>4.&nbsp; Individual Consultant Qualifications and Experience</p><p>Given the high level of technical rigor required to carry out the exercise, which is a succinct and analytically sound comprehensive Nutrition Regulation, dedicated human resource capacity is required in terms of time and technical expertise in conducting such a task. National Expert will objectively review the implementation and coordination mechanisms established by the Nutrition Act 2024 and any other relevant mechanisms. Hence an appropriate experienced expert, who is familiar with the development context in The Gambia and having good working experience of drafting regulations will be preferred. The Expert should possess the following qualification and experience:</p><ul><li>MSc in Law or equivalent</li><li>At least 5 years&rsquo; experience in legal drafting</li><li>Familiarity with Gambian law and with food, nutrition, or public health legislation</li><li>Excellent spoken and written English</li><li>Knowledgeable in computer</li></ul><p><strong><u>Full TOR Availability Notice</u></strong></p><p>The full Terms of Reference (TOR) will be made available upon request. Please send your request via email to the address provided below. The contract duration is 3-6 months.</p><p><strong><u>Submission of Expressions of Interest:</u></strong></p><p>The National Nutrition Agency (NaNA), through the Central Project Coordination Unit (CPCU) of the Ministry of Finance and Economic Affairs, now invites eligible individual consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the services.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank&#39;s &quot;Procurement Regulations for IPF Borrowers&quot; dated February 2025 (&quot;Procurement Regulations&quot;), setting forth the World Bank&#39;s policy on conflict of interest.</p><p>A Consultant will be selected in accordance with the Individual Consultant Selection Method set out in the Consultant Guidelines. Further information and Terms of Reference can be obtained at the address below during office hours from 09:00 to 16:00 Monday to Thursday and 09:00 to 12h30 on Friday.</p><p>Expressions of interest should be delivered in email to the address below on or before<strong> 21 September 2026 at 12:30pm Gambian time</strong></p><p><strong>Central Project Coordination Unit</strong></p><p><strong>Royal Insurance Building</strong></p><p><strong>2nd Floor, Kotu Bertil Harding Highway</strong></p><p><strong>The Gambia</strong></p><p><strong>Email: </strong>nsosseh@cpcumof.gm , mktouray@cpcumof.gm , ygassama@cpcumof.gm and rsey@cpcumof.gm</p>"},{"id":"OP00465088","notice_type":"Request for Expression of Interest","noticedate":"14-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-21T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Pacific 1","project_id":"P502591","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","bid_reference_no":"FJ-PIFS-567205-CS-INDV","bid_description":"RMI - Payments System Advisor","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ratu Sukuna Road, Suva, Fiji.","contact_ctry_name":"Fiji","contact_email":"ajayj@forumsec.org","contact_name":"Ajay Jagannath","contact_organization":"Pacific Island Forum Secretariat","contact_phone_no":"679-3312600","contact_web_url":"www.forumsec.org","submission_date":"2026-09-14T00:00:00Z","notice_text":"<p><strong>Request for Expressions of Interest</strong></p><p><strong>(INDIVIDUAL CONSULTING SERVICES)</strong></p><p><strong>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</strong></p><table cellspacing=\"0\"><tbody><tr><td><p>Project Name</p></td><td><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td><p>Project Number</p></td><td><p>P502591</p><p>https://projects.worldbank.org/en/projects-operations/project-detail/P502591</p></td></tr><tr><td><p>Activity and Reference Number (STEP)</p></td><td><p><strong>Payments System Advisor&nbsp;FJ-PIFS-567205-CS-INDV</strong></p></td></tr><tr><td><p>Implementing Agency Names</p></td><td><p>Pacific Islands Forum Secretariat</p></td></tr><tr><td><p>Country</p></td><td><p>FIJI</p></td></tr></tbody></table><p>&nbsp;The Pacific Islands Forum Secretariat (PIFS) and seven Pacific Island member countries (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) have received financing (grants and credits) from the World Bank Group&rsquo;s International Development Association (IDA) towards the <em>Pacific Strengthening Correspondent Banking Relationships Project</em> (the Project) and will apply part of these proceeds to the contract below for Consulting Services.</p><p>PIFS is seeking a qualified and experienced <strong>Payments System Advisor</strong> to provide technical advisory support to the Monetary Authority of the Marshall Islands (MAMI). The Advisor will assist with the establishment of a safe, efficient, inclusive, and scalable national payments system and oversight function, aligned with the CBR Project, the CBR Roadmap, regional harmonization work, and the emerging Pacific Payment Mechanism (PPM).</p><p>The Advisor will work closely with MAMI, PIFS, the World Bank, IMF, and other technical assistance providers to translate IMF recommendations into practical implementation steps for RMI. This is a time-based individual consultant assignment for up to twelve (12) months, with up to 240 working days of input, requiring significant in-country presence in Majuro (50&ndash;60% of input days).</p><p><strong>Scope of Services</strong></p><p>Under the overall direction of the Project Coordinator, the Payments System Advisor shall undertake the following activities:</p><ul><li><p>Review IMF recommendations and prepare a 12month implementation roadmap for MAMI&rsquo;s payments function.</p></li><li><p>Advise on operational setup of payment operations and oversight divisions.</p></li><li><p>Support development of a National Payments Strategy and stakeholder consultations.</p></li><li><p>Provide technical inputs on payment infrastructure modernization, including phased implementation of an Integrated Payment and Clearing System (IPCS).</p></li><li><p>Support payment system oversight, risk-based supervision, and data collection.</p></li><li><p>Assist with stakeholder coordination and establishment of a National Payment Council.</p></li><li><p>Align RMI&rsquo;s work with regional harmonization initiatives and the CBR Project&rsquo;s Component 2 activities.</p></li><li><p>Deliver training, mentoring, and knowledge transfer to MAMI staff.</p></li></ul><p>Mandatory Criteria</p><p><strong>Education</strong></p><ul><li><p>A master&rsquo;s degree in economics, finance, law, public policy, payment systems, information systems, business administration, or a related field.</p></li><li><p>A PhD or advanced professional qualification is preferred.</p></li></ul><p><strong>Experience</strong></p><ul><li><p>Minimum of 10 years of experience in payment systems, financial market infrastructures, central bank payment operations, payment system oversight, digital financial services, remittances, cross-border payments, or correspondent banking.</p></li></ul><p>&nbsp;</p><p><strong>Evaluated Criteria:</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:515px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; height:20px; vertical-align:bottom; white-space:normal; width:450px\"><strong>Evaluated Criteria</strong></td><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:bottom; white-space:normal; width:64px\"><strong>Points</strong></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Demonstrated experience in developing and implementing national payment systems strategies and oversight frameworks</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Experience advising central banks or monetary authorities on payment infrastructure modernization</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Familiarity with international standards (CPMIIOSCO Principles, ISO 20022, risk-based supervision)</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Experience in stakeholder consultation and coordination across government, financial institutions, and payment service providers</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr></tbody></table><p>&nbsp;</p><p><strong>PIFS,</strong>&nbsp;on behalf of the participating member countries, now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (attach curriculum vitae and a cover letter with description of experience in similar assignments, similar conditions, etc.).</p><p>Firms&rsquo; staff may express interest through the employing firm for the assignment and, under such situation, only the experience and qualifications of individuals shall be considered in the selection process.</p><p>The attention of interested Consultants (including firms) is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, dated February 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. A Consultant will be selected in accordance with the individual consultant selection method set out in the World Bank Consultant Guidelines</p><p>The detailed Terms of Reference (TOR) for the assignment is attached below and provides details of the scope of the services required along with specific deliverables expected. Further information can be obtained at the address below during office hours 09.00 to 17.00 hrs Fiji Time.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) no later than Monday, September 21, 2026, 17:00 hrs (Fiji Time)</p><p>Address for Enquiries and Submission of EOIs</p><p>Pacific Islands Forum Secretariat</p><p>Attn: Ajay Jagannath, Project Coordinator</p><p>Private Mail Bag, Suva</p><p>PO Box 856, Suva, Fiji.</p><p>Tel: 679-3312600</p><p>E-mail: cbrprocurement@forumsec.org&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; TERMS OF REFERENCE</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; CONSULTING SERVICES - INDIVIDUAL SELECTION</strong></p><p><strong>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</strong></p><p><strong>Project Overview</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:256px\"><p>Project Name</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:430px\"><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Indicative Activity / Budget Line</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Component 2: Enabling Environment and Regulatory Harmonization - Payment System Oversight and Regulation - Oversight of National Payment Systems</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Activity Reference Number (STEP)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>FJ-PIFS-567205-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Position Title</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Location of role</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Majuro, Republic of the Marshall Islands, with remote inputs and regular coordination with the Project Management Unit (PMU) in Suva. The assignment is expected to require significant in-country presence in Majuro, estimated at 50-60 percent of total input days. The detailed travel and work schedule will be agreed with PIFS, MAMI and the World Bank through the work plan.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Primary Counterpart</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Monetary Authority of the Marshall Islands (MAMI)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Duration of Assignment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Time-based individual consultant contract for up to twelve (12) months, with up to 240 working days of input. Extension may be considered subject to project needs, budget availability, consultant performance, procurement plan arrangements, and applicable World Bank no-objection requirements. Payments will be based on approved timesheets and eligible reimbursable expenses.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Implementing Agency on behalf of participating countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Pacific Islands Forum Secretariat (PIFS)<br />https://forumsec.org/</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Agency Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges, and foster collaboration and cooperation in the pursuit of shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources and the alignment of policies, furthering Forum members shared goals of economic growth, sustainable development, good governance and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions and agree on policies that will benefit the people of the region.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Competitive Selection of an independent individual consultant, subject to procurement plan adjustment, justification, conflict-of-interest review, and World Bank no-objection requirements where applicable.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Agency Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Islands Forum was established to bring together the region to address shared issues and support cooperation. PIF works through regional governance, shared resources and policy alignment to support economic growth, sustainable development, good governance and security. Founded in 1971, it comprises eighteen members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Participating Countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Island Countries participating in the regional project comprise Fiji, Kiribati, the Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu. This assignment provides country-specific support to the Republic of the Marshall Islands under the regional project.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Overall Project Objective</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Project Development Objective is to enable continuous access to correspondent banking services in the participating Pacific Island Countries.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Project Length</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>August 2024 to September 30, 2030</p></td></tr></tbody></table><p><strong>Project Background</strong></p><p>The Pacific Islands Forum Secretariat (PIFS) has received financing from the World Bank Group&#39;s International Development Association (IDA) for the Pacific Strengthening Correspondent Banking Relationships Project. The project supports participating Pacific Island Countries (PICs) to maintain continuous access to correspondent banking services, and to address underlying payment, regulatory and financial integrity constraints that contribute to de-risking in the region.</p><p>PICs are exposed to the withdrawal of correspondent banking relationships (CBRs) that underpin international trade, tourism, remittances, development finance, disaster relief, and humanitarian financial flows. The project provides a short-term CBR safety net while supporting the enabling environment and regional harmonization needed for a medium-term sustainable solution.</p><p>Component 2 of the project, Enabling Environment and Regulatory Harmonization, includes support for Payment System Oversight and Regulation. The relevant activity areas include payment systems regulatory harmonization, oversight of national payment systems, and collection of remittance and gender-disaggregated data on usage of financial services. Component 2 also supports payment systems strengthening, CBR Roadmap implementation, the CBR Resilience Index, and the feasibility work for the Pacific Payment Mechanism (PPM), which aims to aggregate payment flows and improve economies of scale.</p><p>The Republic of the Marshall Islands (RMI) is in the early phase of operationalizing the MAMI. In June 2026, the Governor of MAMI requested support for an advisor to assist with implementation of the Authority&#39;s operationalization strategy, including review and tailoring of recommendations from the IMF Monetary and Capital Markets Department technical assistance report, Operationalizing A New Monetary Authority. The request also highlighted the need to establish the national payment system in alignment with the World Bank CBR Strengthening Project&#39;s payment system harmonization roadmap.</p><p>The IMF report identifies several payment-related priorities for MAMI. These include the development of a National Payments Strategy (NPS), the establishment of payment operations and payment oversight functions, the creation of a stakeholder consultation mechanism and National Payment Council, the preparation of payment operations and oversight procedures, and the design of an Integrated Payment and Clearing System (IPCS) that can combine ACH, RTGS and instant payment functionality in a phased manner. The report also notes that RMI currently has no centralized payment system, that payment services are dominated by checks, that there is no e-money provider, and that electronic payments remain limited outside selected card and POS use cases.</p><p>This assignment is designed as payment systems technical assistance under the CBR Project&rsquo;s Technical Assistance component. It is framed around the project&#39;s Payment System Oversight and Regulation activities and is expected to support MAMI in converting payment-related IMF recommendations into a practical work plan, institutional arrangements, operating procedures, oversight tools, stakeholder coordination mechanisms, and capacity building outputs.</p><p><strong>Objective of the Position</strong></p><p>The main objective of the Payments System Advisor to MAMI is to provide technical advisory support to MAMI for the establishment of a safe, efficient, inclusive and scalable national payments system and payment system oversight function, aligned with the CBR Project, the CBR Roadmap, regional payment system harmonization work, and the emerging design of the PPM.</p><p>The Advisor will review the payment-related findings and recommendations in the IMF MCM report and assist MAMI to translate the relevant payment system recommendations into a practical implementation approach for RMI. This will include helping MAMI distinguish payment system actions from broader central banking, governance, accounting, audit, reserve management, HR, communications and corporate services matters, and sequencing the payment system actions in line with MAMI&rsquo;s institutional capacity, staffing plans and expected operational priorities.</p><p>In doing so, the Advisor will consider the small scale of the RMI financial sector, the dominance of checks, limited electronic payment usage, geographic dispersion, government payment needs, remittance costs, digital financial-service developments, and MAMI&rsquo;s current staffing and institutional capacity.</p><p><strong>Scope of Services</strong></p><p>The selected Payments System Advisor will provide country-level, time-based technical implementation support for RMI on payment system matters. The work will be coordinated with the PIFS PMU, the PIFS Payment Systems Specialist, the World Bank payments team, IMF MCM and other technical assistance providers as relevant. The Advisor will carry out the following tasks, with timing and level of effort agreed through the 12-month implementation work plan and periodic work planning discussions:</p><p>i. Inception, work planning and IMF recommendation mapping</p><ul><li>Review the IMF MCM report, MAMI Act and related institutional materials, the CBR Project Operations Manual, the CBR Roadmap, available PPM materials, and other relevant documents provided by MAMI, PIFS or the World Bank.</li><li>Prepare an inception report that identifies the payment-related recommendations requiring action by MAMI and separates them from broader central banking, governance, accounting, audit, reserve management, HR, communications, and corporate services matters.</li><li>Develop a 12-month implementation roadmap for the establishment of MAMI&rsquo;s national payments function, with milestones, dependencies, counterpart responsibilities, expected outputs, sequencing assumptions, and coordination points with the World Bank, IMF and PIFS. The roadmap should be aligned with MAMI&rsquo;s expected recruitment of the Banking Operations Department Executive Manager and Payment Systems Operations Manager, anticipated around December 2026 to January 2027, so that the Advisor&rsquo;s support helps prepare for, onboard, and transition responsibilities to these key MAMI counterparts.</li><li>Prepare and periodically update the Advisor&rsquo;s own assignment work plan, aligned with the 12-month MAMI implementation roadmap, counterpart availability, agreed priorities, in-country inputs, and monthly or quarterly work planning discussions with MAMI, PIFS and the World Bank.</li><li>Tailor payment system recommendations to the RMI context, including market size, transaction volumes, institutional capacity, staffing constraints, remittance corridors, public sector payment needs, and affordability for banks and end users.</li></ul><p>ii. Establishment of MAMI&#39;s national payments function</p><ul><li>Advise MAMI on the operational setup, sequencing, staffing profile and accountabilities for its national payments function, including the Payment Operations Division (POD) and Payment Oversight and Policy Division (OVD) recommended by the IMF report.</li><li>Provide advice on the separation of payment system operations and payment system oversight responsibilities within MAMI&rsquo;s payments mandate, including reporting lines, decision processes, internal coordination arrangements, and safeguards to manage potential conflicts between operational and oversight functions.</li><li>Prepare a short skills and capacity building plan for MAMI staff involved in payment operations, payment oversight, payment &nbsp;&nbsp;&nbsp; &nbsp;collection, and stakeholder engagement.</li><li>Assist MAMI to define working procedures and decision flows for its payment system operational and oversight functions, including issue escalation, internal reporting, consultation with supervised or participating institutions, coordination with IT, risk, legal and supervision functions, and referral of matters requiring specialist technical or legal input.</li></ul><p>&nbsp;</p><p>iii. National Payments Strategy</p><ul><li>Support MAMI to develop a National Payments Strategy that sets out a phased modernization agenda for RMI&rsquo;s national payment system, aligned with the National Financial Inclusion Strategy and coordinated with related work under the CBR Project, regional payment system harmonization agenda, and emerging PPM design.</li><li>Prepare or support a baseline diagnostic covering domestic and cross-border payment flows, CBRs, government payments, remittances, check usage, card and POS usage, payment access, digital infrastructure, consumer needs, and data gaps.</li><li>Identify practical measures to increase use of electronic payments, reduce reliance on checks and cash where appropriate, improve government payment flows, support remittance cost reduction, and expand access to payment services for businesses, households and the public sector.</li><li>Support stakeholder consultations on the NPS, including preparation of consultation materials, meeting notes, issue logs and revisions to the strategy based on feedback received.</li></ul><p>iv. Payment infrastructure and IPCS implementation support</p><ul><li>Advise MAMI on a fit-for-purpose and phased approach to payment infrastructure modernization, including the IMF recommendation for an Integrated Payment and Clearing System combining ACH, RTGS and instant payment functionality.</li><li>Advise MAMI on the preparation, review and sequencing of high-level business requirements and implementation planning for any future IPCS, including initial electronic clearing for wire transfers and checks, check truncation, settlement arrangements, participant onboarding, service levels, operating schedules and support arrangements. The Advisor will help MAMI frame the requirements and coordinate specialist inputs but will not be responsible for preparing detailed technical specifications or system design documents unless separately agreed with PIFS, MAMI and the World Bank.</li><li>Assess the sequencing of ACH, RTGS and instant payment functionality based on RMI transaction volumes, costs, operational readiness, risk profile and user needs.</li><li>Advise MAMI on the issues that should be considered when planning future payment infrastructure, including payment messaging, straight-through processing, ISO 20022 readiness, data security, operational resilience, business continuity, disaster recovery, liquidity risk, settlement risk and participant default arrangements. Where detailed technical design is required, the Advisor will help MAMI identify the issues, review options, and coordinate inputs from specialist payment infrastructure, IT, cybersecurity or World Bank experts.</li><li>Provide payment system technical inputs to procurement documents, concept notes or options papers for the IPCS, as requested by MAMI and the PMU, subject to World Bank procurement rules and conflict-of-interest restrictions.</li></ul><p>v. Payment system oversight, data and risk-based supervision</p><ul><li>Support MAMI to define a payment system oversight framework covering objectives, scope, standards, tools, reporting, escalation, corrective actions and coordination with other MAMI functions.</li><li>Advise MAMI on the scope, structure and phased development of oversight procedures for risk-based monitoring of payment systems and payment service providers, including e-money and non-bank PSPs where relevant. The Advisor may prepare outlines, review drafts and support capacity building, but detailed supervisory manuals, examination procedures or legal instruments should be developed with appropriate specialist and legal input as required.</li><li>Advise MAMI on the payment data and indicators that should be collected for oversight and policy purposes, including payment volumes and values, failed transactions, settlement incidents, fraud, customer complaints, operational incidents, participation, concentration, liquidity risk, credit risk and operational risk. The Advisor may support the development or review of reporting templates in coordination with MAMI, PIFS and the World Bank, but the final templates should be agreed by MAMI and aligned with wider project data requirements.</li><li>Provide technical inputs to and reviews of payment-related regulations, rules, circulars or supervisory guidance as requested, including on electronic payments, PSPs, system participation and operational risk. This role does not include drafting primary payment system legislation or formal legal opinions.</li><li>Align oversight tools with relevant international standards and guidance, including the CPMI-IOSCO Principles for Financial Market Infrastructures, ISO 20022, risk-based supervision practices, consumer protection principles and cyber-resilience expectations applicable to payment systems.</li><li>Review USDM1-related payment system implications, considering existing RMI AML laws and regulations and MAMI&rsquo;s current regulatory treatment of USDM1, and advise on whether any payment system oversight, interoperability, reporting, operational risk, consumer safeguard or AML/CFT coordination measures should be reflected in MAMI&rsquo;s national payment system framework. The Advisor will not provide advice on the sovereign debt, securities law, issuance, redemption, collateral, reserve management or investment aspects of USDM1 except where these issues directly affect payment system oversight or integration.</li></ul><p>vi. Coordination, consultation and National Payment Council support</p><ul><li>Assist MAMI to establish a consultation mechanism with banks, government agencies, SOEs, card schemes, telecom operators, payment service providers, major users and other stakeholders involved in payments modernization.</li><li>Prepare draft Terms of Reference, membership options, work program and first-year agenda for a National Payment Council or equivalent advisory body.</li><li>Support MAMI in coordinating with the Ministry of Finance on payment-related services, including government payment flows, account information, reporting expectations, service levels, and inputs to any payment-related SLA or MOU arrangements.</li><li>Prepare stakeholder maps, consultation papers, meeting agendas, minutes and action trackers to support implementation of the national payments work plan.</li></ul><p>vii. Alignment with the CBR Project and regional work</p><ul><li>Coordinate closely with the PIFS PMU, PIFS Payment Systems Specialist and World Bank payments team to align RMI support with the CBR Project&#39;s Component 2 work program.</li><li>Support RMI inputs into CBR data collection, the CBR Resilience Index and the PPM feasibility and design process, including payment flow data, remittance information, CBR information and stakeholder feedback.</li><li>Assist MAMI to collect and improve relevant remittance and gender-disaggregated data on the usage of financial services, where feasible and agreed with the PMU and World Bank.</li><li>Identify areas where RMI can participate in regional harmonization work, including PSP licensing, QR code standards, open banking/open finance, cross-border interoperability and common principles for cross-border data sharing.</li><li>Coordinate with IMF MCM and other technical assistance providers, through MAMI, PIFS and the World Bank as appropriate, to reduce duplication, sequence inputs, and keep the assignment focused on payment system matters within the agreed CBR Project scope. Where feasible, the Advisor may support periodic coordination discussions, including around the Annual Meetings or Spring Meetings, if requested by MAMI, PIFS or the World Bank.</li></ul><p>viii. Capacity building and knowledge transfer</p><ul><li>Identify MAMI staff training needs, develop a multi-year training plan, and identify opportunities for training and knowledge transfer aligned with MAMI&rsquo;s payment system mandate, staffing plan and future development priorities.</li><li>Prepare training materials, practical templates and work aids that MAMI staff can continue to use after the assignment.</li><li>Identify peer learning opportunities with regional central banks or payment system operators, including short technical exchanges or virtual clinics where appropriate.</li><li>Provide mentoring to assigned MAMI counterparts and support handover of tools, procedures and work plans before the end of the assignment.</li></ul><p><strong>Scope Exclusions</strong></p><p>The assignment is limited to payment systems technical assistance and payment-related operationalization of MAMI. The Advisor will not draft the Payment Systems Act, amendments to the Monetary Authority Act, primary legislation, or formal legal opinions.</p><p>The Advisor will not provide general central bank advisory services on reserve management, fiscal agency, accounting, audit, human resources, communications, procurement, general governance, or corporate services except where those topics directly affect payment system operations, payment oversight, payment infrastructure or payment-related stakeholder coordination.</p><p><strong>Time-Based Reporting Obligations and Expected Outputs</strong></p><p>This assignment will be contracted on a time-based basis. Payments will be linked to approved timesheets, agreed input days, and eligible reimbursable expenses, not to a fixed-price deliverables schedule. The outputs listed below are expected working products and reporting instruments for managing the assignment, tracking progress, supporting quality review, and documenting knowledge transfer.</p><p>The Advisor will prepare and update working products in line with the agreed work plan and counterpart needs. These may include the inception note and 12-month payments work plan, IMF recommendation mapping, National Payments Strategy materials, payment function setup notes, National Payment Council materials, payment operations and oversight procedures, data templates, IPCS options and requirements notes, training materials, mission notes and handover materials.</p><p>Because the role is advisory and embedded with MAMI for a substantial part of the assignment, outputs may be revised or reprioritized during implementation with agreement from MAMI, PIFS and the World Bank. The Advisor will document changes through monthly activity notes, quarterly progress notes and the action tracker.</p><p><strong>Reporting Obligations</strong></p><p>The Payments System Advisor will work closely with MAMI on a day-to-day technical basis and will report administratively to the Project Coordinator within the PIFS PMU. Technical priorities, work planning, and expected outputs will be agreed with MAMI, PIFS and the World Bank payments team. The Advisor will also coordinate with the PIFS Payment Systems Specialist and the RMI Country Coordinator as relevant.</p><p>The Advisor will submit monthly timesheets and short monthly activity notes to the PIFS PMU, with confirmation from MAMI of the main activities undertaken. The monthly activity note should summarize days worked, in-country and remote inputs, meetings held, outputs prepared, issues requiring decision, and planned activities for the following month. Technical outputs will be shared with MAMI and PIFS, and PIFS will share them with the World Bank for review or no-objection where required under the project arrangements.</p><p>The Advisor will maintain a short action tracker covering agreed activities, responsible counterparts, due dates, risks, dependencies and decisions required. The tracker will be updated at least monthly, and more frequently if requested by the PMU or MAMI. The Advisor will also provide quarterly progress notes against the 12-month payments work plan and a final completion and handover note at the end of the assignment.</p><p><strong>Institutional Arrangements</strong></p><p>This is a time-based individual consultant assignment contracted by PIFS through the PMU under the Pacific Strengthening CBR Project. The assignment will be undertaken for the benefit of MAMI as the primary country counterpart. The procurement approach is competitive selection of an independent individual consultant, subject to the approved procurement plan, applicable PIFS procurement procedures, conflict-of-interest review, and World Bank review or no-objection requirements where applicable.</p><p>The Advisor is expected to spend significant time in Majuro during the assignment, estimated at 50-60 percent of total input days, especially during inception, stakeholder consultations, NPS preparation, payment function setup, capacity building and infrastructure planning. Remote work may be used for document preparation, virtual meetings, training, follow-up and coordination with PIFS and the World Bank.</p><p>Office space and access to meeting facilities may be provided by MAMI for in-country inputs and by PIFS for inputs in Suva, subject to availability. The Advisor will be responsible for maintaining secure records of documents, correspondence and data received during the assignment and for complying with all confidentiality requirements.</p><p>The Advisor&#39;s services will be subject to periodic performance review based on the performance indicators below. Performance review will inform continuation, extension, revision or termination of the assignment, subject to contract terms and World Bank requirements.</p><p>&nbsp;</p><p><strong>Performance Indicators</strong></p><p>The following performance indicators will be used for contract management and performance assessment. They are intended to measure timely input, quality of advisory support, documented outputs, counterpart engagement and knowledge transfer under a time-based contract:</p><ul><li>Monthly timesheets are submitted on time and accurately distinguish between in country and remote input days.</li><li>Monthly activity notes are submitted on time and summarize work undertaken, meetings held, issues requiring decision, risks, planned next steps and counterpart engagement.</li><li>The Advisor maintains and updates an action tracker covering agreed activities, responsible counterparts, deadlines, dependencies and pending decisions.</li><li>A 12-month implementation roadmap for MAMI&rsquo;s national payments function is prepared, discussed with MAMI, PIFS and the World Bank, and updated as required during implementation.</li><li>The Advisor&rsquo;s own assignment work plan is maintained and aligned with the 12-month MAMI implementation roadmap, MAMI counterpart availability and agreed priorities.</li><li>Payment-related IMF MCM recommendations are mapped and separated from broader central banking, governance, accounting, audit, reserve management, HR, communications and corporate services matters.</li><li>MAMI receives documented advice, meeting notes or working materials on the setup of payment operations and payment oversight responsibilities, including staffing, reporting lines, procedures and capacity needs.</li><li>MAMI is supported in preparing or refining National Payments Strategy materials, consultation inputs and implementation roadmap elements.</li><li>Payment infrastructure advice is documented through advisory notes, review comments or options papers that support a phased and fit-for-purpose approach to any future IPCS, without requiring the Advisor to develop systems or detailed technical specifications.</li><li>Payment system oversight and data work is documented through advisory notes, outlines, review comments, reporting needs, draft structures or training materials, with specialist technical or legal work referred to appropriate experts where required.</li><li>Stakeholder engagement is documented through meeting notes, action trackers, consultation materials or National Payment Council support materials.</li><li>Capacity building activities are documented through training materials, attendance records, mentoring notes or handover materials.</li><li>Quarterly progress notes are submitted against the agreed work plan and discussed with MAMI, PIFS and the World Bank.</li><li>A final completion and handover note is submitted at the end of the assignment, summarizing work undertaken, outputs prepared, remaining actions, open risks and recommended next steps.</li><li>The Advisor maintains professional, objective and impartial advice, avoids conflicts of interest, records input days accurately, and complies with PIFS and World Bank rules on confidentiality, anti-corruption and fraud prevention.</li></ul><p><strong>Confidentiality and Conflict of Interest</strong></p><p>The Payments System Advisor shall comply with PIFS and World Bank policies and rules on anti-corruption, prevention of fraudulent practices, conflict of interest and confidentiality. The Advisor shall maintain confidentiality over all sensitive information obtained during the assignment and shall not publish or disclose any findings, data, reports or recommendations without prior written consent from PIFS and MAMI, and World Bank clearance where required.</p><p>Any draft reports and other documents produced by the Advisor will be discussed with and cleared by PIFS, MAMI and the World Bank before final issue. A non-disclosure agreement may be signed between PIFS, MAMI and the selected consultant and attached to the contract.</p><p>The Advisor must disclose any actual or potential conflict of interest before contract signature and throughout the assignment. The Advisor shall not participate in downstream procurement activities where such participation would create a conflict of interest under the World Bank Procurement Regulations or the Project Operations Manual.</p><p><strong>Evaluation Requirements</strong></p><p><strong>Mandatory Criteria</strong></p><p>This section details the basis upon which selection of the successful candidate will be based.</p><p>These criteria must be met to be considered for this contract.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:133px\"><p>Mandatory Criteria</p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:426px\"><p>Description</p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:103px\"><p>Evaluation</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Education</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>A master&#39;s degree in economics, finance, law, public policy, payment systems, information systems, business administration or a related field. A PhD or other advanced professional qualification is preferred.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Pass or Fail</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>A minimum of 10 years of experience working on payment systems, financial market infrastructures, central bank payment operations, payment system oversight, digital financial services, remittances, cross-border payments, correspondent banking, or financial sector supervision, including senior management experience in a central bank, monetary authority or financial sector authority. The candidate should have held, at minimum, a department-head or equivalent senior management role covering payment system policy, operations, oversight, supervision or related financial sector functions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Pass or Fail</p></td></tr></tbody></table><p><strong>Desirable Qualifications</strong></p><p>These criteria are desirable qualifications that will be considered in confirming the suitability of the proposed consultant and documenting the direct selection justification. Candidates who meet the mandatory criteria will be ranked out of 100 points based on the scoring criteria above. The evaluation committee may interview the highest-ranked candidates where clarification is required or where candidates are closely ranked.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:31px\"><p><strong>#</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:594px\"><p><strong>Evaluated Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:61px\"><p><strong>Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Knowledge of the economic and financial environment in the Pacific, small island states, or other small and capacity-constrained jurisdictions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience advising central banks or financial sector authorities on National Payments Strategies, payment system modernization, payment operations, payment system oversight, or payment infrastructure implementation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>25</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience with digital financial services, e-money, non-bank payment service providers, remittances, financial inclusion, consumer protection, gender-disaggregated data, or public sector payments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Ability to prepare high-quality strategies, advisory notes, manuals, operating procedures, data templates, training materials and implementation roadmaps.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience coordinating multi-stakeholder assignments involving central banks, ministries of finance, banks, payment service providers, telecom operators, development partners and regional organizations.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\">&nbsp;</td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong>Language:</strong> Excellent command of both spoken and written English is required</p><p>&nbsp;</p><p><strong>Selection Method</strong></p><ul><li>The consultant will be selected through a competitive selection process for an independent individual consultant, subject to the approved procurement plan and applicable World Bank requirements.</li><li>Selection will follow the Selection of an Individual Consultant, World Bank Procurement Regulations Seventh Edition, September 2025.</li><li>Candidates will be assessed against the mandatory criteria and desirable qualifications set out above, based on CVs, supporting documentation, relevant experience, availability, references, and any interview or written assessment deemed necessary by the evaluation committee.</li><li>Candidates who do not meet the mandatory criteria will not be evaluated further.</li><li>Candidates who meet the mandatory criteria will be ranked based on their demonstrated experience and suitability for the assignment, including payment systems expertise, central bank or monetary authority experience, experience in small or capacity-constrained jurisdictions, ability to provide significant in-country presence in Majuro, and capacity to provide practical advisory and implementation support.</li><li>At least two professional references should be obtained or verified for the preferred candidate before contract signature.</li><li>Contract negotiation with the preferred candidate will confirm the daily fee rate, estimated input schedule, in-country presence plan, reimbursable expenses, confidentiality obligations, reporting arrangements and conflict-of-interest undertakings.</li><li>The final selection will be subject to any required PIFS internal approvals, procurement plan requirements, and World Bank review or no-objection requirements.</li><li>The project values individuality and welcomes candidates from diverse cultural, racial, gender and disability backgrounds.</li></ul>"},{"id":"OP00468526","notice_type":"Request for Expression of Interest","noticedate":"13-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-26T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Yemen, Republic of","project_id":"P178143","project_name":"Program on Sustainable Fishery Development in Red Sea and Gulf of Aden (SFISH)","bid_reference_no":"PERSGA-2403-CS-INDV","bid_description":"Individual consultant to carry out final assessment and evaluation of the regional component of the project \"Sustainable Fishery Development in Red Sea and Gulf of Aden\"-SFISH","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"PERSGA, P.O. Box 53662, Al-Worood Street, Jeddah 21583\nKingdom of Saudi Arabia.\nTel: +966.12.4238865","contact_ctry_name":"Saudi Arabia","contact_email":"ahmed.khalil@persga.org","contact_name":"Ahmed Khalil","contact_organization":"The Regional Organization for the Conservation of the Environment of the Red Sea and Gulf of Aden","contact_phone_no":"+9661242348874","contact_web_url":"www.persga.org","submission_date":"2026-09-13T00:00:00Z","notice_text":"<p>&nbsp;</p><p>&nbsp;</p><p><strong><u>Terms of Reference </u></strong></p><p><strong>Individual Consultant for Final Review of the &ldquo;Sustainable Fisheries Development in Red Sea and Gulf of Aden&rdquo; Project (SFISH Project)</strong></p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:13px; vertical-align:top; width:46%\"><p><strong>Program/Project Number: </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:13px; width:53%\"><p>P178143</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:13px; vertical-align:top; width:46%\"><p><strong>Activity Code:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:13px; vertical-align:top; width:53%\"><p>PERSGA-2403-CS-INDV</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:5px; vertical-align:top; width:46%\"><p><strong>Type of contract; and expected start/end dates of assignment</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:5px; vertical-align:top; width:53%\"><p>Lump-sum, based on linked deliverables;</p><p>During October 2026 -February 2027</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong>Background</strong></li></ol><p><strong>1.1. Context</strong></p><p>The Regional Organization for Conservation of the Marine Environment of the Red Sea and Gulf of Aden (PERSGA) is an intergovernmental organization established since 1995. PERSGA institutional framework is based on the Regional Convention for the Conservation of the Red Sea and Gulf of Aden Environment (Jeddah Convention 1982), which joins seven member states, including Djibouti, Egypt, Jordan, Saudi Arabia, Somalia, Sudan, and Yemen. Rational use of marine resources and the protection of coastal marine environment from pollution and overexploitation are central objectives of Jeddah Convention (1982) and its derived Action Plan Regional Protocols and Action Plan. PERSGA runs regional programs and projects that support regional capacities and coordination to achieve these objectives.</p><p>This consultancy is carried out in the framework of the implementation of the regional project &ldquo;Sustainable Fisheries Development in the Red Sea and Gulf of Aden&rdquo;, referred to hereafter as SFISH project. The project is financed by the World Bank (WB), and executed by PERSGA for its regional component. In accordance with the M&amp;E policies and procedures of WB, a Final Evaluation of the SFISH project is required.&nbsp; The project has started on August 2022 and is approaching its closing by March 2027. This TOR sets out the prospect for the project Final Evaluation.</p><p><strong>1.2 Background on SFISH project (Regional Component)</strong></p><p>PERSGA is executing the SFISH project Regional Component, which composes the subject of this Final Evaluation TOR. This Component aims to strengthen regional collaboration in management of marine fisheries and aquaculture in the Red Sea and Gulf of Aden. Its focus is to improve and sustain regional collaboration through further development of PERSGA&rsquo;s capacities for monitoring, assessment, knowledge management and sharing to support science-based management of fisheries in the RSGA. It supports the development of a regional platform for coordination of policies, legislation, management plans and measures for responsible fisheries and aquaculture and use of ecosystems approaches. It also supports regional level capacity building and technical assistance program on management of living marine resources responding to both anthropogenic and climate induced changes. This would include training, providing technical guidelines, support the development of policies, legislation, management plans and completion, ratification and implementation of relevant regional conventions, action plans and protocols. The project regional component interventions were designed to be through the following interlinked subcomponents:</p><ol><li><em>PERSGA Regional Information Management System (RIMS), monitoring network and institutional capacity</em>. This subcomponent aims to strengthen the capacity of PERSGA, as a regional organization, to compile fisheries and related data collected or received from the countries and make this information available to all member states. It provides goods and services to improve IT hardware and software of the RIMS housed in PERSGA, and networking to allow it to perform integrated functions. The subcomponent also supports PERSGA system capacity for monitoring marine environment, including on climate change impact in the RSGA area, tracking pollution spills, and coordination of emergency response that have implications to protection of fisheries and their critical habitats. It also supports updating PERSGA institutional guidelines as needed, such as for finance and procurement policy and procedures, project cycle management, and environmental and social risks assessment and management.</li><li><em>Regional platforms for capacity building and regional coordination of sustainable fisheries and aquaculture in the regional management mechanism</em>. This subcomponent supports capacity development, technical assistance and setting up of platforms for effective coordination on fishery management at the regional level. It supports PERSGA to develop technical manuals for cost-effective approaches of harmonized fisheries data and information collection and management adapted to the region, incorporating supplementary guidelines for monitoring, and assessing IUU fishing, fish stock status etc., and a regional mechanism to share information with member states on fishery statistics and knowledge. It will also support PERSGA to develop technical guidelines to promote capacities to effectively coordinate efforts for fisheries management, policies, and legislation; protection and restoration of critical fish habitat; environmental and biosecurity best practices in aquaculture, building climate resilience and regional mechanism to interact with relevant international efforts. The activity will also include support to PERSGA in developing a Regional Plan of Action for combating IUU fishing (RPOA-IUU), and other specific action plans concerning conservation of vulnerable non target species such as sharks, turtles, seabirds and marine mammals. These action plans would provide an umbrella mechanism for cooperation and coordination of measures to combat IUU fishing, and other conservation measures related to RSGA fisheries.</li><li><em>Enhanced knowledge management, communication strategies and awareness for citizen, private sector and development partner engagement in the regional sustainable fishery mechanism</em>. This subcomponent includes technical assistance, consultations, and operating costs for supporting citizen, private sector and development partner engagement and raising awareness through effective communication on regional cooperation actions, including improved activities that demonstrate cooperation and coordination among the regional countries. It also supports the development of special awareness activities, including production and dissemination of educational materials (videos, media toolkits, brochures, pamphlets, etc.) addressing fishery issues due to anthropogenic actions and climate change, and communication workshops to enhance their engagement.</li></ol><p>Further detailed information on the project, and related project documents can be reached at the following link: https://sfish.persga.org/</p><ol><li><strong>Consultancy</strong></li></ol><p><strong>2.1 Objectives of the Final Evaluation (FE)</strong></p><p>The objective of the FE is to provide an independent assessment of the project&rsquo;s achievements, outcomes and potential longer-term impacts. As an end-of-project evaluation undertaken during the final implementation period, the FE will assess performance over the implementation period up to an evaluation cut-off date agreed during inception, with material implementation developments and final results updated through completion of the evaluation where any evidence becomes available. It will consider forward-looking in capturing lessons learned and providing evidence on the nature and extent of results, their likely sustainability, and implications for future programming.</p><p>The evaluation will thus assess the project design, scope, implementation and achievements. It will collate and analyse lessons learnt, challenges faced and best practices obtained during implementation, which will inform the next programming strategy in response to its priorities, and make recommendations regarding the specific actions in this regard. These should emphasize, for example issues to be addressed in the future follow up interventions, significant outcomes and success stories for potential expansion and replication.&nbsp;</p><p><strong>2.2 Scope and Approach of the FE</strong></p><p>The FE should provide evidence-based information that is credible, reliable and useful. The consultant is expected to follow a participatory and consultative approach ensuring close engagement with the Project team at PERSGA, and government counterparts of the member countries including PERSGA Focal Points, National Coordinators of the project, and key stakeholders. The review consultant is expected to conduct a field mission to view project interventions and achievements, and partake in meetings and workshop organized in the framework of the FE process. Interviews will be held with the following organizations and individuals at a minimum:</p><ul><li><ul><li>PERSGA staff who have project responsibilities;</li><li>Project National Coordinators</li><li>Stakeholders, including the beneficiaries in at least two of the Participating Countries,</li></ul></li></ul><p>The consultant will review all relevant sources of information, such as the project documents, project implementation progress reports, financial reports, activities&rsquo; reports, strategic and legal documents, World Bank aide memoires from support meetings, outputs and products and any other material that he / she considers useful for this evidence-based review and evaluation.</p><p>The FE shall review and validate the project&#39;s Theory of Change (ToC). In this connection, the evaluation shall assess whether the assumptions and causal pathways underlying project design remained valid during implementation, and examine the extent to which project interventions, outputs, and intermediate results contributed to the achievement of intended outcomes and development objectives. The assessment should identify key enabling factors and constraints that influenced results achievement and sustainability.</p><p>The Project FE will assess the effectiveness of the implementation strategy and the results. This will include the implementation modalities, responsibilities and co-financing roles, coordination and partnership arrangements, institutional strengthening, beneficiary participation, training and workshop attendance and outcomes, replication and sustainability of the project outcomes. The evaluation will include review of the project design and assumptions made at the beginning of the project development process; project management including the implementation strategies; project activities, so as to assess the extent to which the project results have been achieved, partnerships established, capacities built, and cross cutting issues of mainstreaming development issues. It will also assess whether the project implementation strategy has been optimum and recommend areas for improvement and learning for future programming interventions.</p><p>To achieve the FE objectives following relevant World Bank and PERSGA guidelines, the consultant will consider the following categories of project performance. For each of the Relevance, Efficacy and Efficiency categories, and for the overall assessment, the consultant is required to apply the rating scales set out below. The sustainability and risks to development outcomes will be assessed descriptively, i.e. rating is not required; however, the main risks and enabling factors should be clearly identified and prioritized.</p><ol><li><ol><li><ol><li><strong>Relevance</strong></li></ol></li></ol></li></ol><p>The FE will assess the extent to which the project objectives, design and focus are relevant to the identified problem and needs. It will also assess how the project interventions approached are realistic, appropriate, and responsive to changes for achieving project objectives. Thus, the Relevance of objectives assesses: (i) the alignment with the partnership framework of the World Bank and PERSGA&nbsp; and pertaining development strategy at the time the operation is closed; (ii) appropriateness of the PDO given the client&rsquo;s implementation capacity; and (iii) the extent to which the PDO was responsive to the changing circumstances. The explanation of the alignment of the PDO includes a description of the development problem the project sought to address and how this problem was addressed through the project&rsquo;s interventions given the context and existing capacity.</p><p><strong><em>Rating</em></strong><strong>:</strong>&nbsp; Considering the above, the Relevance of PDO will be rated using a four-point scale, including High, Substantial, Modest, and Negligible, as follows</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td style=\"vertical-align:top; width:114px\"><p><em>High:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Full alignment with the priorities of the regional framework and development strategy; PDO was appropriately pitched and responsive to changing circumstances&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Substantial:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Largely aligned with the priorities of the regional framework and development strategy, with minor shortcomings in appropriateness or responsiveness.</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Modest:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Partial alignment with the priorities of the regional framework and development strategy, or notable shortcomings in appropriateness or responsiveness</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Negligible</em>:</p></td><td style=\"vertical-align:top; width:504px\"><p>Very limited alignment with the priorities of the regional framework and development strategy, with major shortcomings in appropriateness or responsiveness</p></td></tr></tbody></table><p><strong>2.2.2 Efficacy</strong></p><p>Assessing the project Efficacy is the core section in this Final Evaluation, as well as in the Learning and Results Note (LRN) for Investment Project Financing Operation of the World Bank. Efficacy is defined as the extent to which the project objectives were achieved, or are expected to be achieved, and that achievement is attributable to the activities or actions supported by the project, or to what extent the project&rsquo;s activities contributed to the achievement of the objective(s). The PDO statement conveys the benefits (changes) expected to flow to the beneficiaries, expressed in terms of development outcomes, rather than stating financed activities and outputs. &nbsp;Thus, to examine the project Efficacy, the FE will consider several aspects, such as:</p><ul><li>Achievement of the Project development objectives: including through Results Framework (RF) Indicators, outputs and outcomes assessments. The RF can provide logical information to measure achievement of each expected outcome in the PDO statement through examining data on indicators document, observed achievements and compare them to baselines and targets.&nbsp; However, it is important to assess efficacy at the level of expected outcomes rather than just presenting data of the project&rsquo;s results indicators. It will be useful to also look beyond the Results Framework to any other available data and evidence. Where applicable, the efficacy section would also discuss here achievement of cross-cutting and corporate objectives, such as contribution to institutional strengthening and other development objectives (e.g. relevant SDGs</li><li>Project management performance by PERSGA: including through assessing management processes and appropriateness in supporting implementation and delivering results; Monitoring and Evaluation (M&amp;E) quality assessment; implementation strategies; responding to the needs of the beneficiaries; involving stakeholders; adaptive management to overcome obstacles/challenges, or grasping opportunity to upscale/ expand results;</li></ul><p><strong><em>Rating</em></strong><strong>:</strong>&nbsp; Considering the above, the project Efficacy will be rated using a four-point scale, including High, Substantial, Modest, and Negligible, as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td style=\"vertical-align:top; width:114px\"><p><em>High:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>The Project fully achieved or exceeded its objectives (or intended outcomes) or is likely to do so</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Substantial:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>The Project almost fully achieved its objectives (or intended outcomes) or is likely to do so</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Modest:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>The Project partly achieved its objectives (or intended outcomes) or is likely to do so</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Negligible</em>:</p></td><td style=\"vertical-align:top; width:504px\"><p>The Project barely achieved its objectives (or intended outcomes) or is likely to do so</p></td></tr></tbody></table><p><strong>2.2.3 Efficiency</strong></p><p>The FE will assess the efficiency of the project implementation with regard to:</p><ul><li>Utilizing the fund resources, where actual/ expected results justify costs incurred;</li><li>Synergy and coordination with other overlapping and similar interventions (funded nationally and /or by other donors);</li><li>Considering collaboration with the national institutions and development partners;</li><li>Management structures, procedure and accountability;</li><li>Performance in project management, coordination, procurement and financial management, reporting, stakeholder engagement, and responsiveness to implementation challenges.</li></ul><p><strong><em>Rating</em></strong><strong>:</strong>&nbsp; Considering the above, the project Efficiency will be rated using a four-point scale, including High, Substantial, Modest, and Negligible, as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td style=\"vertical-align:top; width:114px\"><p><em>High:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Efficiency exceeds expectations</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Substantial:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Efficiency is what would be expected in the project/ operation&rsquo;s sector.</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Modest:</em></p></td><td style=\"vertical-align:top; width:504px\"><p>Efficiency is below expectations in the project/ operation&rsquo;s sector.</p></td></tr><tr><td style=\"vertical-align:top; width:114px\"><p><em>Negligible</em>:</p></td><td style=\"vertical-align:top; width:504px\"><p>Efficiency is very low in comparison with both the benefits (if any) and with recognized norms in the project/ operation&rsquo;s sector.</p></td></tr></tbody></table><p><strong>2.2.4 Overall Outcome </strong></p><p>This FE will assess the Overall Outcome in a very brief (1-2 sentences) description. This will be based on the integrated assessment of Relevance, Efficacy, and Efficiency above.</p><p><strong><em>Rating:</em></strong>&nbsp; Overall Outcome rating is derived by combining the assessments of Relevance, Efficacy, and Efficiency, using a 6-point scale, as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.4in\"><tbody><tr><td style=\"vertical-align:top; width:202px\"><p><em>Highly Satisfactory:</em></p></td><td style=\"vertical-align:top; width:413px\"><p>There were no shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance</p></td></tr><tr><td style=\"vertical-align:top; width:202px\"><p><em>Satisfactory</em><em>:</em></p></td><td style=\"vertical-align:top; width:413px\"><p>There were minor shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance</p></td></tr><tr><td style=\"vertical-align:top; width:202px\"><p><em>Moderately Satisfactory</em><em>:</em></p></td><td style=\"vertical-align:top; width:413px\"><p>There were moderate shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance</p></td></tr><tr><td style=\"vertical-align:top; width:202px\"><p><em>Moderately Unsatisfactory</em>:</p></td><td style=\"vertical-align:top; width:413px\"><p>There were significant shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance</p></td></tr><tr><td style=\"vertical-align:top; width:202px\"><p><em>Unsatisfactory:</em></p></td><td style=\"vertical-align:top; width:413px\"><p>There were major shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance.</p></td></tr><tr><td style=\"vertical-align:top; width:202px\"><p><em>Highly Unsatisfactory:</em></p></td><td style=\"vertical-align:top; width:413px\"><p>There were severe shortcomings in the project&rsquo;s achievement of its objectives, in its efficiency, or in its relevance</p></td></tr></tbody></table><p><strong>2.2.5 Sustainability and Risks to Development Outcomes</strong></p><p>The FE will assess how sustainability issues were considered in the project design, planning and implementation, examining:</p><ul><li>The extent that the benefits of the project are likely to be sustained after the completion of this project; exit strategies, and approaches to phase out assistance provided by the project including contributing factors and constraints</li><li>key risks that may affect maintenance of project outcomes after project closure, including institutional, financial, technical, and regional cooperation risks</li><li>&nbsp;Key factors that will require attention in order to improve prospects of sustainability of Project outcome</li><li>Success stories and potential for their replication/ scaling up of the approaches and outcomes</li><li>Sustainability of capacities built at the individual and organizational level including a focus on IT systems, data collection and analysis and sustainability of regional data sharing.</li><li>The extent to which technical manuals, guidelines, and training programs developed under the project incorporate and promote principles of resource efficiency in living marine resources, fisheries and aquaculture management.</li><li>Assessment of Environmental and Social Performance: the Final Evaluation shall assess the extent to which project implementation complied with the Environmental and Social Framework (ESF) and relevant Environmental and Social Standards (ESSs), including the integration of ESF requirements into project regulatory procedures, implementation, and management. The assessment should review the effectiveness of stakeholder engagement and consultation processes, operation of grievance redress mechanisms, management of labor and working conditions risks, and the extent to which technical assistance activities were designed and implemented in a manner consistent with ESF principles and requirements. The evaluation should identify any environmental or social implementation challenges encountered, assess how they were addressed, and document lessons learned for future operations, main lessons and recommendations for harmonizing or comparable/ interventions in future, e.g. comprehensive proposals for future interventions based on the current evaluation findings.</li><li>Document cross-cutting outcomes: Assess contributions to institutional strengthening, regional cooperation, capacity building, climate resilience, private sector engagement, and other relevant cross-cutting objectives supported by the project.</li></ul><p>&nbsp;</p><p><strong>2.3 Key Evaluation Questions</strong></p><p>Articulating the above, the following core questions can guide assessments in the FE. The consultant may refine, add to and operationalize for the inception report and evaluation matrix, which will be subject to agreement with PERSGA:</p><ul><li>Theory of Change and contribution: To what extent did the project&rsquo;s assumptions and causal pathways remain valid, and how did project interventions contribute to observed outcomes?</li><li>Relevance: To what extent did the project objectives, design and interventions remain aligned with regional fisheries and aquaculture priorities, World Bank and PERSGA strategic priorities, beneficiary needs and changing circumstances?</li><li>Efficacy: To what extent were the PDO and intended outcomes achieved, or are likely to be achieved by project closure, based on the Results Framework and other credible evidence?</li><li>Efficiency: How efficiently were financial, human and institutional resources, implementation arrangements, procurement, financial management and partnerships used to deliver results?</li><li>Implementation and management performance: How effective were project governance, coordination, M&amp;E, stakeholder engagement, adaptive management and regional cooperation arrangements?</li><li>Sustainability and risks: How likely are project benefits, institutional capacities, regional platforms, data systems, partnerships and other results to be sustained after project closure, and what are the principal risks?</li><li>Environmental, social and cross-cutting performance: To what extent were relevant ESF/ESS requirements and cross-cutting objectives, including institutional strengthening, climate resilience, capacity building and private-sector engagement, effectively addressed?</li><li>Lessons and future programming: What evidence-based lessons, scalable practices and recommendations should inform future regional fisheries and marine resource management interventions?</li></ul><p><strong>3. Expected Deliverables</strong></p><p>The following deliverables are expected (see schedule of deliverables below):</p><p><strong>3.1 Inception report</strong></p><p>The FE consultant will prepare an inception report, which details his/her conception of the assessment, the approach and how the evaluation questions will be addressed. This is to ensure that the evaluator and the stakeholders have a shared view of the assessment. The inception report will include an evaluation matrix summarizing the evaluation design, methodology, questions, data sources, collection and analysis tools, and measures by which questions will be evaluated. The report will include the scope of work, work plan, timeframe after starting the evaluation process. The inception report should include a proposed schedule of tasks; activities and deliverables, with clear responsibilities for each task or product. The inception report will be discussed and agreed upon with PERSGA and project stakeholders.</p><p><strong>3.2 Draft assessment report</strong></p><p>The FE consultant will prepare a draft Project Assessment Report, cognizant of the proposed format of the report and checklist used for the assessment (outlined in 3.3 below). The draft report will be submitted to PERSGA for review and comments by its review panel and stakeholders, and to validate that the evaluation considered all relevant information and meets the required approach and quality criteria. The report will be produced in English. PERSGA is responsible for ensuring timely arrangement for the review and validation of the report involving stakeholders&rsquo; remarks within the allocated time-frame. Within undertaking the assessment and preparation of the draft report, the consultant is expected to carry out field mission to the region in order to collect and confer data and information.</p><p>The assessment report should provide extra detailed information as annexes, such as tables with Indicator&gt; Baseline&gt; Target&gt; Actual&gt; Assessment of Achievement, and other similar data. The appraisal should also discuss whether indicators were appropriate measures of the intended outcomes.</p><p><strong>3.3 Final FE Report and regional workshop</strong></p><p>The consultant shall consider above comments on the draft report to develop the final assessment report. The content and the structure of the final analytical report with findings, recommendations and lessons learnt should cover the above scope of the evaluation and should meet the requirements of M &amp; E for PERSGA and World Bank. Following clearance of the assessment report, the consultant will be invited to participate and present assessment findings and recommendations in the project FE regional workshop.</p><p>The content is expected to include (at least) the following:</p><ul><li>Executive summary (2-4 pages)</li><li>Introduction (1-2 page)</li><li>Description of the evaluation approach and methodology (6-8 pages)</li><li>Project context and rationale (4-6 pages)</li><li>Achievement of outcomes against objectives</li><li>Analysis regarding the project progress and achievements of the objectives, outputs and outcomes; challenges, impacts, etc., considering the scope outlined above (10-12 pages)</li><li>Analysis of opportunities and options for guidance in relevant future interventions (6-8 pages)</li><li>Other key findings; practices, lessons learned and potential success stories (4-6 pages): Lessons should be evidence-based, actionable, and relevant for future regional fisheries and marine resource management operations, with clear implications for successor interventions.</li><li>PERSGA performance (2-4 pages)</li><li>Conclusions and recommendations (4-6 pages)</li><li>Appendices (charts, tables, terms of reference, itinerary, people interviewed, documents reviewed, further readings, etc)</li></ul><p><strong>3.4 Tentative schedule of the consultancy Deliverables</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.3in; width:52%\"><p><strong><em>Deliverable</em></strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.3in; width:47%\"><p><strong><em>Time Frame</em></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Inception Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within one week after signing of contract</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Review and agreement on Inception Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within one week after submission of the report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Draft Assessment Report (including field mission)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within six weeks after approval of the inception report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Review of Draft Assessment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within two weeks after submission of the draft report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Final Report with review comments addressed</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within two weeks after receiving PERSGA comments on draft report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.3in; width:52%\"><p>Presentation of the key findings and recommendations in FE regional workshop</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.3in; width:47%\"><p>Within a month from clearing the Final Report</p></td></tr></tbody></table><p><strong>4. Management, Coordination and PERSGA Inputs</strong></p><p><strong>4.1 Supervision and review of deliverables</strong></p><p>The consultant will report to the designated PERSGA Project Coordinator/official responsible for the SFISH Regional Component. PERSGA will designate a review panel for the assignment and will provide consolidated comments on deliverables within the review periods stated in Section 3.4. Acceptance of deliverables will be based on conformity with this TOR, the agreed inception report and evaluation matrix, and applicable PERSGA and World Bank requirements.</p><p><strong>4.2 PERSGA inputs and facilitation</strong></p><p>PERSGA will facilitate the assignment by providing or arranging timely access, subject to applicable confidentiality requirements, to relevant project documentation and data, including the Project Appraisal/implementation documents, Results Framework data, progress and financial reports, procurement information, M&amp;E records, aide-memoires, activity reports, technical outputs and other relevant project records. PERSGA will also facilitate contact with National Coordinators, Focal Points and other key stakeholders and support coordination of mission meetings and the regional workshop.</p><p><strong>4.3 Independence, confidentiality and conflict of interest</strong></p><p>The consultant shall conduct the evaluation independently, impartially and with professional integrity. Any actual, potential or perceived conflict of interest shall be disclosed promptly to PERSGA. Information obtained through the assignment shall be treated confidentially where appropriate, and stakeholder views shall be presented in a manner that protects respondents where confidentiality has been requested. Evaluation findings and ratings shall be evidence-based and shall remain the professional responsibility of the consultant.</p><p><strong>5. Type of contract, duty station and payment</strong></p><p>This contract falls under short-term consultant category system of PERGSA. It is on a lump sum basis, and payment will be in instalments linked with deliverables as specified below.</p><p>The consultant will work from homebase, where he/she has access to the relevant technical literature, to prepare for the evaluation. The consultant will undertake a mission to PERSGA region to conduct field assessments and establish required arrangement and networking with review team at PERSGA, and undertaking interviews with relevant participants/beneficiaries, examine project outputs; review &amp; update input information/data, and discuss, thematic approach, layout, analysis results, content, etc. of the draft document.</p><p>The payment instalments will be owed as follows:</p><ul><li>25% after adoption of the inception report</li><li>50% after undertaking the field mission and submission of the draft assessment report</li><li>25% after the approval of the final report, participation in the final evaluation workshop and submission of workshop report</li></ul><p><strong>6. Required qualifications/expertise and application procedure</strong></p><ul><li>Advanced degree (preferable PhD) in marine environmental policies, living marine resources/ fisheries management, marine sciences, development policies, economic planning, economics, project management or other related fields.</li><li>Extensive knowledge and expertise in the field of evaluation of development projects and programs, including working with international organizations and donors, relevant technical areas for at least 15 years.</li><li>Experience with assessment of similar World Bank and PERSGA projects is preferable. Experience and familiarity with working in the region will be an added value.</li><li>Knowledge and experience with result-based management and evaluation methodologies, applying indicators and reconstructing or validating baseline scenarios;</li><li>Demonstrable analytical and reporting skills of international standards;</li><li>Excellent English communication skills. Arabic and French are advantages.</li></ul><p>&nbsp;</p><p><strong>Qualified candidates are requested to submit their updated CVs, together with expression of interest (EOI) to PERSGA in Jeddah, Kingdome of Saudi Arabia, at the email address: </strong><strong>sourcing@persga.org</strong>. <strong><u>Deadline for receiving application is 26 September 2026.</u></strong></p>"},{"id":"OP00468303","notice_type":"Request for Expression of Interest","noticedate":"11-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-25T00:00:00Z","submission_deadline_time":"00:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P175731","project_name":"SADC Regional Statistics Project","bid_reference_no":"BW-SADC-563157-CS-CQS","bid_description":"Training in Poverty Statistics","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Plot 54385, New CBD, Private Bag 0095, Gaborone","contact_ctry_name":"Botswana","contact_email":"djagai@sadc.int","contact_name":"Deepchandsingh Jagai","contact_organization":"Southern African Development Community","contact_phone_no":"3641623","contact_web_url":"https://www.sadc.int/procurement-opportunities.","submission_date":"2026-09-11T00:00:00Z","notice_text":"<p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>SADC SECRETARIAT</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>REQUEST FOR EXPRESSION OF INTEREST (CONSULTANT QUALIFICATIONS-BASED SELECTION- CQS) SHORTLISTING </strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>COUNTRY:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong><strong>Botswana</strong><strong> </strong></p><p>&nbsp;</p><p><strong>NAME OF PROJECT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; REGIONAL STATISTICS PROJECT (RSP) </strong></p><p>&nbsp;</p><p><strong>PROJECT ID:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;P175731</strong></p><p>&nbsp;</p><p><strong>ASSIGNMENT TITLE:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CONSULTANCY TO HIRE A FIRM FOR UNDERTAKING TRAINING AND TECHNICAL ASSISTANCE FOR COMPUTATION AND ANALYSIS OF POVERTY STATISTICS - MULTIDIMENSIONAL POVERTY INDEX (MPI) METHOD FOR TEN SADC MEMBER STATES </strong></p><p>&nbsp;</p><p><strong>REFERENCE NUMBER:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</strong> <strong>SADC/3/5/2/461</strong></p><p>&nbsp;</p><p><strong>DATE OF ISSUE: 10th September 2026 </strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Background </strong></p><p>&nbsp;</p><p>The SADC Secretariat through the Regional Statistics Project has received a grant. The aim of this grant is to strengthen the institutional capacity of SADC and participating countries to produce, disseminate and use quality statistics while increasing regional harmonization and collaboration.</p><p>&nbsp;</p><p>The Regional Infrastructure Development Master Plan (RIDMP), the SADC Regional Agricultural Policy (RAP), the Industrialisation Strategy and the Roadmap, among others, are complementary guiding frameworks for achieving the regional integration agenda. SADC has also developed various Protocols for domestication and implementation by Member States including the most recent one, the Protocol on Statistics, to enhance harmonization of statistics. The operating framework for implementing statistical activities as priorities for the region is the Regional Strategy for Development of Statistics (RSDS) and is aligned to SADC Vision 2050 and RISDP 2020-30.</p><p>&nbsp;</p><p>Demand for quality and harmonized statistics has been on the rise to monitor progress in developmental agendas at national, regional, continental, and global level. The scope of data demand cuts across economic, social, and on emerging issues such as climate change, disaster-risk, environment and others related.</p><p>&nbsp;</p><p>The SADC Secretariate intends to apply part of the proceeds of this financing to eligible payments under the contract for hiring a CONSULTANCY TO HIRE A FIRM FOR UNDERTAKING OF TRAINING AND TECHNICAL ASSISTANCE FOR COMPUTATION AND ANALYSIS OF POVERTY STATISTICS - MULTIDIMENSIONAL POVERTY (MPI) METHOD FOR 10 SADC MEMBER STATES</p><p>&nbsp;</p><p>&nbsp;</p><p>The SADC Secretariat invites submissions from suitably qualified and interested firms to conduct the trainings, recruited following World Bank Procurement Regulations dated September 2023.</p><p>&nbsp;</p><p><strong>Title&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :</strong> CONSULTANCY TO HIRE A FIRM FOR UNDERTAKING OF TRAINING AND TECHNICAL ASSISTANCE FOR COMPUTATION AND ANALYSIS OF POVERTY STATISTICS - MULTIDIMENSIONAL POVERTY INDEX (MPI) METHOD FOR 10 SADC MEMBER STATES</p><p><strong>Accountable&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :</strong>&nbsp; Senior Officer, Research and Statistics&nbsp;</p><p><strong>Duration of Assignment:&nbsp; 20 months </strong></p><p>&nbsp;</p><ol><li><strong>The Objectives of the Assignment: </strong>The overall objective of this consultancy is to enhance the capacity of statisticians in SADC Member States and in S&atilde;o Tom&eacute; and Pr&iacute;ncipe (STP) to effectively utilize the MPI as a comprehensive tool for policy development and poverty reduction. By providing in-depth capacity-building workshops and targeted technical assistance, this initiative aims to equip national teams with the necessary skills and knowledge to compute, analyze, and interpret their national MPIs and SADC harmonized MPIs. This, in turn, will enable them to develop evidence-based policies that address the multiple dimensions of poverty, thereby contributing to the achievement of their national development plans, SADC Vision 2050 and Sustainable Development Goals (SDGs). The detailed scope of work can be obtained from the terms of reference below.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li>The SADC Secretariat now invites eligible consulting firms to indicate their interest in providing these services. Interested consulting firms must provide information indicating that they are qualified to perform the services (i.e., Company profile detailing alignment to the assignment, description of similar assignments undertaken, experience in similar conditions and availability of appropriate skills among staff).</li></ol><p>&nbsp;</p><ol><li>The consulting firm should have significant in-depth expertise and knowledge in activities such as stakeholder engagement, training and capacity building conducted under this assignment must align with the World Bank&rsquo;s Environmental and Social Framework (ESF) and its applicable Environmental and Social Standards (ESSs), ensuring that recommendations consider potential environmental and social risks and align with best practices in transboundary water resource management.&nbsp; Work under this consultancy is also expected to incorporate gender-sensitive approaches in all project activities and conduct a GBV/SEA/SH risk assessment.&nbsp;</li></ol><p>&nbsp;</p><ol><li>Establishment of the short-list and the selection procedure shall be in accordance with the attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; which is available on the Bank&rsquo;s website at<em> </em><em>https://thedocs.worldbank.org/en/doc/Procurement-Regulations-September-2023.pdf</em><em>. </em>The Consultant will be selected under the Consultants Qualifications-based Selection.</li></ol><p>&nbsp;</p><p>The firms will be shortlisted using the following criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:14.0cm\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:416px\"><p><strong>Evaluation Criteria </strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:113px\"><p>Points</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:416px\"><p>Firm specific experience related to the assignment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>40</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:416px\"><p>Availability of Qualified and Experienced Experts</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>60</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:416px\"><p>Total</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p><strong>100</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><ol><li>Interested consultants may obtain further information and detailed terms of reference at the address below during office hours 08h00hours to 16h30hours Botswana time.</li></ol><p>&nbsp;</p><ol><li>Expressions of interest must be submitted electronically in PDF format and dully signed via this <strong>LINK:&nbsp; </strong><strong>https://collab.sadc.int/s/Ho7emTYbrBbf8TH</strong><strong> </strong></li></ol><p>&nbsp;</p><p>by 00.00 hours midnight Botswana time on <strong>25 September 2026</strong> and should mention the name of the consultancy assignment<strong>.</strong> CONSULTANCY TO HIRE A FIRM FOR UNDERTAKING OF TRAINING AND TECHNICAL ASSISTANCE FOR COMPUTATION AND ANALYSIS OF POVERTY STATISTICS - MULTIDIMENSIONAL POVERTY INDEX (MPI) METHOD FOR 10 SADC MEMBER STATES</p><p>&nbsp;</p><p><strong>Firms are advised to submit their proposals during working hours for support in case of any technical problems. Expressions of Interest must be submitted as one PDF file or zipped folder bearing the name of the applicant.</strong></p><p>&nbsp;</p><ol><li>Below is the address for obtaining further information:</li></ol><p>&nbsp;</p><p>The Procuring entity:&nbsp;SADC Secretariat</p><p>Head of Procurement Unit</p><p>Telephone:&nbsp;+267&nbsp;364 1989 / 3951863</p><p>Fax:&nbsp;3972848</p><p>E-mail: mmikuwa@sadc.int&nbsp;</p><p>Copy to: djagai@sadc.int; tchabwera@sadc.int&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 2 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong><strong>Detailed TORs</strong></p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>CONSULTANCY TO HIRE A FIRM FOR UNDERTAKING OF TRAINING AND TECHNICAL ASSISTANCE FOR COMPUTATION AND ANALYSIS OF POVERTY STATISTICS - MULTIDIMENSIONAL INDEX (MPI) METHOD FOR 10 SADC MEMBER STATES</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>1. </strong><strong>BACKGROUND INFORMATION</strong></p><p><strong>1.1 Background</strong></p><p>The Southern African Development Community (SADC) is a regional community of 15 Southern African states comprising Angola, Botswana, Comoros, DRC, Lesotho, Madagascar, Malawi, Mauritius, Mozambique, Namibia, Seychelles, South Africa, Swaziland, Tanzania, Zimbabwe and Zambia. It was established at the Summit of Heads of State and Government on 17 August 1992 in Windhoek, Namibia.</p><p>SADC foundation under Vision 2050 is to attain higher levels of peace and stability, enabling the further prioritisation, pursuit, and achievement of its objectives of socio-economic development, poverty eradication and regional integration.</p><p>Poverty eradication and improvement of the well-being of the people of the Southern African Development Community (SADC) region through regional integration and cooperation remain the ultimate goal for the region.&nbsp; The long-term objective of SADC is to reduce poverty in the region through economic growth as well as peace, democracy and stability. Specific objectives of SADC pertaining to poverty as outlined in the Treaty establishing SADC in Article 5 are stated as follows:</p><ol><li>To promote sustainable and equitable economic growth and socio-economic development that will ensure poverty alleviation with the ultimate objective of its eradication, enhance the standard and quality of lie of the people of Southern Africa and support the socially disadvantaged through regional integration; and</li><li>Ensure that poverty eradication is addressed in all SADC activities and programmes.</li></ol><p>&nbsp;</p><p>Recognising that poverty remains the greatest challenge confronting the SADC region, a Consultative Conference on Poverty and Development for SADC Heads of State and Government was convened in Mauritius in 2008. The objective of the conference was to intensify dialogue on regional dimensions of poverty, strengthen collective efforts to address poverty through regional cooperation and integration and to continue dialogue on the partnerships necessary to accelerate the achievement of the Millennium Development Goals (MDGs). The main outcome of the conference was the signing of a Declaration on Poverty Eradication and Sustainable Development by the Heads of State and Government.&nbsp; Among others, the Heads of State and Government resolved to:</p><ol><li>Achieve food security by setting up Task Force of Ministers of Trade, Agriculture and Finance to encourage regional collaboration and by sustainably improving the production capacity and productivity, facilitating cross boarder and internal food flows based on improved infrastructure and distribution networks</li><li>Promote financial sector development including micro finance and develop small and medium enterprises with emphasis on gender</li><li>Strengthen partnerships with the private sector and civil society at large to mobilise financial and technical resources to combat poverty at its root</li></ol><p>&nbsp;</p><p>With regard to monitoring progress in poverty eradication initiatives, the Declaration further highlighted on the need to work towards the establishment of a Regional Poverty Observatory (RPO) to monitor progress made in the implementation of actions in the main priority areas of poverty eradication. It also noted the need to acquire and develop adequate capacity both at the Secretariat and Member States level to ensure effective implementation of poverty eradication programmes.</p><p>&nbsp;</p><p>While poverty has traditionally been measured in terms of income &ndash; now classified by the World Bank as living on less than $2.15 a day PPP 2017 &ndash; the SDGs define poverty as having multiple forms, with a target to reduce at least by half the proportion of men, women and children of all ages living in poverty in all its dimensions by 2030.&nbsp; To date, most countries use a national monetary poverty measure for policy decisions. Recently, a number of policy makers have adopted official multidimensional measures that: (1) analyse non-monetary deprivations and their interconnections; (2) enable the creation of high-impact policies that address multiple interconnected deprivations and accelerate progress towards the SDGs, and (3) guide policy and provide feedback in a timely manner.</p><p>&nbsp;</p><p>The Multidimensional Poverty Index (MP)I can be used as an analytical tool to identify the most vulnerable people, show aspects in which they are deprived and, consequently, to target resources and design policies more effectively. Because the MPI measures outcomes directly, it will immediately reflect changes such as school attendance, whereas it can take time for this to affect income, thus may show outcomes of effective policy interventions quickly.</p><p>&nbsp;</p><p>Finally, in the understanding that each country is different, the MPI can be tailored to local context using country-specific data and indicators to provide a better understanding of country-level poverty. As of 2022, around 40 countries in the developing world have developed and adopted national MPIs as official measure to track progress and coordinate policy actions against poverty. In SADC specifically, 9 out of 16 member states have produced national MPIs.</p><p>&nbsp;</p><p>Following this trend, countries with national MPIs are now currently using their Indices to:</p><p>&nbsp;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Allocate resources more effectively;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Improve policy design;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Identify interconnections among deprivations;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Monitor the effectiveness of policies over time;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Target poor people as beneficiaries of services or conditional cash&nbsp;&nbsp; transfers.</p><p>&nbsp;</p><p><strong>1.2 Current situation in the Secto</strong><strong>r</strong></p><p>The SADC Vision 2050 earmarks Statistics a priority cross-cutting sector whereby by 2050, the region strategic objective in statistics is to realize a robust and responsive regional statistical system to underpin regional integration processes, including measurement of progress and impact. The SADC RISDP 2020-30 draws impetus from the Vision 2050 and thereby identify key intervention areas to achieve the expected outcome of enhanced statistical infrastructure, systems, and capacity across the region for production and effective use of harmonized regional statistics. The key intervention areas include primarily the development and implementation of policy and legal frameworks for coordinating regional statistics and capacity across the entire data value chain of the regional statistical system strengthened.</p><p>&nbsp;</p><p>Article 11 of the SADC Protocol on Statistics refers explicitly to poverty statistics. Specifically, Member States shall produce and disseminate Multidimensional Poverty Index (MPI) by gender and age in accordance with the United Nations Development Programme (UNDP) Handbook on How to Build a National MPI built with dimensions of health, education, standard of living and other dimensions tailored to their national priorities, as a common regional methodological framework to produce national and regional poverty statistics. The SADC Regional Strategy for Development of Statistics (RSDS 2020 &ndash; 30) is designed as a sectoral strategy to be responsive to data needs to pertaining to measurement of regional policies and programmes of the RISDP 2020 &ndash; 30 in pursuit to the goals of the SADC Vision 2050. The RSDS focuses of developing harmonized methodological guidelines in statistics and rolling out of capacity building and subsequent assessment/reviews including in poverty statistics.</p><p>&nbsp;</p><p>The Regional Strategy for Development of Statistics (RSDS) 2020-30 is complementary sectoral strategy for achieving regional integration as embedded in RISDP 2020-30, for statistics sector. In line with the strategic objective, expected outcome, implementation plan and strategic outputs of Statistics as embedded in RISDP 2020-30, the 6 identified strategic intervention areas of RSDS 2020-30 priorities for implementation are as follows:</p><p>&nbsp;</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Policy frameworks for development of regional statistics;</p><p>(ii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Institutional strengthening and sustainability of the SADC Regional Statistical System;</p><p>(iii)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Harmonization of regional statistics;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>(iv)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Digital transformation of regional statistics;</p><p>(v)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Capacity for data production, management, dissemination and use; and</p><p>(vi)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Quality of regional statistics.</p><p>&nbsp;</p><p>At statutory level, the SADC Statistics Committee, comprising of Head of Statistics in the SADC Member States provides policy, strategic and professional guidance for the statistical development and integration processes in the region. The Committee meets at least once a year and monitor progress in the SADC Statistics Program and oversee the implementation of statistical development. The Statistics Unit of Secretariat primary function is to co-ordinate and rationalize all regional statistical activities in line with continental and international statistical frameworks and provides technical and secretarial support to the Statistics Committee. The Committee reports directly to the SADC Council of Ministers.</p><p>&nbsp;</p><p>SADC Secretariat, with the support from the World Bank Group is currently implementing the Regional Statistics Project (RSP) with the development objective to strengthen the institutional capacity of SADC and participating countries to produce, disseminate and use quality statistics while increasing regional harmonization and collaboration. Among the scope of interventions in this project, capacity building in the area of poverty statistics features importantly for both monetary and non-monetary measures. A significant milestone was reached in December 2024 where the SADC MPI structure was discussed and agreed. Furthermore, recommendation was made for undertaking of in-depth national trainings in MPI and technical assistance for generation of MPI using real survey data. <strong>It is within this context that this consultancy is looking for a firm</strong><strong> </strong><strong>(registered firm, research institutions, universities and similar institutions are eligible for the current assignment) to undertake the following core tasks that are mutually exclusive to each other in 10 Member States:</strong></p><p>&nbsp;</p><ol><li>National Training dedicated to the methodology and the technical steps required to update the national MPI with both theoretical sessions and practical exercises; and</li><li>Technical assistance for computation and analysis of poverty statistics &ndash; MPI using real data obtained from surveys.</li></ol><p><strong>2. OBJECTIVE, PURPOSE &amp; EXPECTED RESULTS</strong></p><p><strong>2.1 Overall objective</strong></p><p>The overall objective of this consultancy is to enhance the capacity of statisticians in SADC Member States to effectively utilize the MPI as a comprehensive tool for policy development and poverty reduction. By providing in-depth capacity-building workshops and targeted technical assistance, this initiative aims to equip national teams with the necessary skills and knowledge to compute, analyze, and interpret their national MPIs and SADC harmonized MPIs. This, in turn, will enable them to develop evidence-based policies that address the multiple dimensions of poverty, thereby contributing to the achievement of their national development plans, SADC Vision 2050 and Sustainable Development Goals (SDGs).</p><p><strong>2.2 Specific Objectives (Purpose)</strong></p><p>(i)&nbsp; Conduct in-depth national trainings on the computation and use of the MPI (including using STATA software) for selected Member States;</p><p>&nbsp;</p><p>(ii)&nbsp; Provide technical assistance (TA) to selected Member States to compute national and SADC harmonized MPIs based on available survey and/or administrative data; and</p><p>&nbsp;</p><p>(iii) Assess gaps during training and/or technical assistance (TA) sessions, and identify the necessary support required to ensure Member States produce the SADC harmonized MPIs.</p><p><strong>2.3 Results to be achieved by the contractor</strong></p><p>The consultancy is expected to achieve the following results:</p><ol><li>Training Component: Training Report covering the scope of training provided&nbsp; and the current status including challenges and action plan with timelines of the Member State for generating national MPI and the SADC harmonized MPI;</li></ol><p>ii.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Technical Assistance Component: Report covering the scope of work undertaken for generation of national and SADC Harmonized MPIs using real survey and/or administrative data including work processes/documentation for use by the NSO in the foreseeable future.</p><p>&nbsp;</p><p><strong>3. ASSUMPTIONS &amp; RISKS</strong></p><p><strong><em><u>3.1 COMPONENT 1: NATIONAL TRAINING</u></em></strong></p><p><strong>3.1-1 </strong><strong>Scope of Work</strong></p><p>The selected service provider is expected to deliver for respective Member State a week-long (5 day) in-person technical training workshop to build capacity among statisticians and users of poverty statistics in the technical team in charge of computations of the national MPI. The training will include concepts and definitions of MPI including on the structure of SADC harmonized MPI with practical exercises using STATA software. This is key for the understanding of the Alkire-Foster method and how to use it to design, compute and analyse the national MPI.</p><p><strong>3.1-2 Geographical area to be covered</strong></p><p>The assignment will be carried out in selected Member States of SADC region</p><p>&nbsp;</p><p><strong>3.1-3 Target groups</strong></p><p>This consultancy is expected to target producers and users of poverty statistics at national level.</p><p>&nbsp;</p><p><strong>3.1-4 Specific Work</strong></p><p>The assignment will be carried out primarily through engagement and discussions with Central Statistics Office of respective Member State and the Statistics Unit of SADC Secretariat.</p><p>The assignment will be carried out primarily in person. This will be complemented by preparatory work for the workshops which will be home-based. In particular, the service provider shall:</p><ul><li>Produce Concept Notes for the training to be conducted in Member States</li><li>Develop a training programme for each country on the Alkire-Foster method and how to use it to compute an MPI.</li><li>Tailor the programme to the needs and level of participants in each Member State.</li><li>Prepare the training materials.</li><li>Deliver the training at mutually agreed dates.</li><li>Prepare a short training report for each workshop.</li></ul><p>&nbsp;</p><p><strong><em><u>3.2 COMPONENT 2: TECHNICAL ASSISTANCE</u></em></strong></p><p><strong>3.2-1 Scope of Work</strong></p><p>The selected service provider is expected to generate and analyse poverty indicators from mostly recent available survey and/or administrative data for the specific Member State (5 days). In addition, assessment about the structure of the SADC harmonized MPI also must be done using the survey/administrative data availability. A report must be produced with main findings of the survey data that includes work processes using STATA package as part of documentation.</p><p><strong>3.2-2 Geographical area to be covered</strong></p><p>The assignment will be carried out in selected Member States of SADC region</p><p>&nbsp;</p><p><strong>3.2-3 Target groups</strong></p><p>This consultancy is expected to target producers and users of poverty statistics at national level.</p><p>&nbsp;</p><p><strong>3.2-4 Specific Work</strong></p><p>The assignment will be carried out primarily through engagement and discussions with Central Statistics Office of respective Member State and the Statistics Unit of SADC Secretariat.</p><p>The assignment will be carried out primarily in person. This will be complemented by preparatory work for the workshops which will be home-based. In particular, the service provider shall:</p><ul><li>Produce Concept Notes for the task being undertaken to assist SADC Secretariat and Member States</li><li>Assess the real data obtained from most recent surveys undertaken and possibly, administrative data</li><li>Use STATA to generate and analyze the MPI indicators</li><li>Produce a report with the methodology and results of the national MPI, which the country could publish</li><li>Assess and document the extent to which the survey/administrative data is responsive to generate the SADC harmonized MPI and recommend possible solutions including design of questions for integration in forthcoming surveys.</li><li>Prepare a report documenting all processes including STATA generated codes.</li></ul><p>&nbsp;</p><p><strong>4. QUALIFICATIONS AND EXPERIENCE</strong></p><p>This assignment is expected to be carried out by firm consultant. The firm should have proven track record of 10 years of conducting large-scale socio-economic research and providing technical support on computation of poverty statistics, focusing on multidimensional poverty studies at national, regional and global level.&nbsp; The composition of the technical experts has to include:</p><p>&nbsp;</p><ol><li>Team Leader</li><li>Technical Experts</li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:737px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:103px\"><p><strong>Profiles of Experts</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:219px\"><p><strong>Qualifications and Skills</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:162px\"><p><strong>General Experience</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:253px\"><p><strong>Specific Experience</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:103px\"><p><strong>Team Leader</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><ul><li>Minimum of a master&rsquo;s degree in Statistics, Economics and related field. A P.HD in socio economic research is an added advantage.</li></ul><p>&nbsp;</p><ul><li>Excellent oral and written communication, analytical, presentation and report writing skills in English Language.&nbsp; Proficiency in French and Portuguese languages is also a requirement for undertaking of the trainings and TAs in such Member States.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:162px\"><ul><li>demonstrated experience of 15 years in developing multidimensional indices and working with complex datasets, particularly in the context of developing countries, including SADC Member States.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:253px\"><ul><li>Demonstrable experience in undertaking technical assistance in at least 5 countries for the development of national MPIs.</li></ul><p>&nbsp;</p><ul><li>Proficiency in data analysis software such as STATA, R, or similar.&nbsp;</li></ul><p>&nbsp;</p><ul><li>Experience in working with national statistics agencies, and other government institutions</li></ul><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:103px\"><p><strong>Technical Expert</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><ul><li>Minimum of a master&rsquo;s degree in Statistics, Economics and related field.</li></ul><p>&nbsp;</p><ul><li>Excellent oral and written communication, analytical, presentation and report writing skills in English Language.&nbsp; Proficiency in French and Portuguese languages is also a requirement for undertaking of the trainings and TAs in such Member States.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:162px\"><ul><li>demonstrated experience of with 7 years in statistical analysis and econometric methods, specifically the Alkire-Foster MPI method.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:253px\"><ul><li>Demonstrable experience in undertaking technical assistance in at least 5 countries for the development of national MPIs.</li></ul><p>&nbsp;</p><ul><li>Proficiency in data analysis software such as STATA, R, or similar.&nbsp;</li></ul><p>&nbsp;</p><ul><li>Experience in working with national statistics agencies, and other government institutions</li></ul><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>The experts must be independent and free from conflicts of interest in the responsibilities they take on.</p><p><strong>5. </strong><strong>REPORTING REQUIREMENTS AND TIME SCHEDULED FOR DELIVERABLES</strong></p><p><strong>5.1 Reporting requirements</strong></p><p>The consultant shall operate under the guidance of the Director &ndash; Policy Planning and Resource Mobilization (D-PPRM) and direct supervision of the Senior Programme Officer (SPO) &ndash; Research and Statistics.</p><p>All the deliverables shall be delivered to the SPO &ndash; Research and Statistics whilst the approval of the deliverables shall be the responsibility of the D-PPRM.</p><p>All reports shall be in electronic format in MS Word, Excel, STATA or others related as the case may be. The Firm shall work with the Secretariat with specific Member State sequentially. Once a training and/or a Technical Assistance is completed in a given Member State, the consultancy shall then proceed to the delivery of activities in the next Member State sequentially till all 5 Member States are covered. A maximum of 5 training and 5 technical assistance activities shall be made during the financial year ending March 2026. The following deliverables must be delivered the following in electronic format within 1 month after completion of each training and/or technical assistance per Member State being assisted:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:654px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:152px\"><p><strong>Name of report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:254px\"><p><strong>Content</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:248px\"><p><strong>Time of submission</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:152px\"><p>Training Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:254px\"><p>Document to cover results stated at 2.3 and tasks 3.1 above. The recommendations must be SMART and that can be embedded in a results-based framework for monitoring and evaluation to measure impact of the activity.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:248px\"><p>1 month (30 calendar days) after completion of training component of 1 Member State</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:152px\"><p>Technical Assistance Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:254px\"><p>Document in line with 2.3 and 3.2 above. The recommendations must be SMART and that can be embedded in a results-based framework for monitoring and evaluation to measure impact of the activity.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:248px\"><p>1 month (30 calendar days) after completion of technical assistance component of 1 Member State</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>5.2 Submission &amp; approval of reports</strong></p><p>Two copies of the reports referred to above must be submitted to the entities as identified at 5.1 above. The reports must be written in English.</p><p><strong>5.3 </strong><strong>Project Management</strong></p><p>Overall responsibility for direct supervision of the consultancy will lie with the Senior Programme Officer &ndash; Research and Statistics. The Consultant shall be responsible for the operational day-to-day management and coordination of the consultancy work.</p><p><strong>5.4 Management Structure</strong></p><p>The Consultant shall report directly to the Senior Programme Officer &ndash; Research and Statistics</p><p><strong>6. </strong><strong>LOGISTICS AND START DATE</strong></p><p><strong>6.1&nbsp; Location</strong></p><p>The assignment will involve traveling to selected Member States.</p><p><strong>6.2&nbsp; Office accommodation</strong></p><p>None required</p><p><strong>6.3&nbsp; Facilities to be provided by the contracting authority</strong></p><p>For the expert working on this consultancy, the Contracting Authority shall facilitate for visa entry in the selected Member States, if required.</p><p><strong>6.4&nbsp; Facilities to be provided by the contractor</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The contractor must ensure is the Team Leader and Technical Expert are adequately prepared and equipped for delivery of the training and drafting of deliverables. Moreover, the Consultancy Firm is expected to be fully self- sufficient in terms of international travel associated expenses in the selected Member States with laptop and related device connectivity for projector for this consultancy.</p><p><strong>6.5&nbsp; Equipment</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No equipment is to be purchased on behalf of the contracting authority / procuring entity as part of this service contract or transferred to the contracting authority / procuring entity at the end of this contract. Any equipment related to this contract that is to be acquired by the procuring entity must be purchased by means of a separate supply tender procedure.</p><p><strong>6.6&nbsp; Start date and period of implementation</strong></p><p>The intended start date is as soon as both parties have signed the contract agreement and the period of implementation of the contract will be 20 months from the date of signing the agreement. Please see Article 3 of the specific contract for the actual start date and period of implementation.</p><p><strong>7.&nbsp;&nbsp;&nbsp; MONITORING AND EVALUATION </strong></p><p><strong>7.1&nbsp; Definition of indicators</strong></p><p>The indicators to be used are timeliness, technical coverage and analytical quality of the Report as detailed in section 5 above. In addition, assessment of the effectiveness of the training to be done using pre and post test surveys with recipients of the capacity building activity.</p><p><strong>7.2&nbsp; Special requirements</strong></p><p>The Consultant Firm must declare any potential conflict of interest between the provision of the requested services, and other activities in which a member of their consortium of group(s), or any expert proposed in their offer is engaged.</p><p><strong>8.&nbsp;&nbsp;&nbsp; ASSUMPTIONS AND RISKS </strong></p><p><strong>8.1&nbsp; Assumptions underlying the project</strong></p><p>It assumed that the consultant would be procured within the reasonable timeframe and activities implemented within 20 months.</p><p><strong>8.2&nbsp; Risks</strong></p><p>The nature of the assignment presents negligible risks associated with the consultancy. Some of the foreseen risks are the following:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:627px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:244px\"><p><strong>Possible risks</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:96px\"><p><strong>Risk Level</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:287px\"><p><strong>Mitigation Measures</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:12px; vertical-align:top; width:244px\"><ol><li><ol><li><ol><li><ol><li><ol><li><ol><li><ol><li>Delayed delivery of expected outputs as per minimum standards</li></ol></li></ol></li></ol></li></ol></li></ol></li></ol></li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:12px; vertical-align:top; width:96px\"><p>Medium</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:12px; vertical-align:top; width:287px\"><p>Monitor implementation and delivery of outputs through monthly technical meetings</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>9.&nbsp;&nbsp;&nbsp; FINANCIAL PROPOSAL</strong></p><p>The financial proposal should be a lump sum that&nbsp; includes professional fees, travel costs and any other&nbsp; cost&nbsp; for conduct of the&nbsp; trainings in 10 countries with the split of fees individually for the 10 countries.</p><p>&nbsp;</p><p><strong>9.2&nbsp; Schedule of payment</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payments for the assignment shall be related to the reports and their approval as follows:</p><p><strong>10%</strong> of the contract price shall be paid upon submission and approval of the inception report and training materials</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the first Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the second Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the third Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the fourth Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the fifth&nbsp; Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the sixth&nbsp; Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the seventh Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the eight&nbsp; Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the ninth&nbsp; Member State trained</p><p><strong>9%</strong> of the contract price shall be paid upon submission and approval of the Training Report for the tenth&nbsp; Member State trained</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00468332","notice_type":"Request for Expression of Interest","noticedate":"11-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-25T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Lebanon","project_id":"P180334","project_name":"Lebanon Green Agrifood Transformation for Economic Recovery (GATE)","bid_reference_no":"LB-KAFALAT-571176-CS-INDV","bid_description":"Senior Credit Analyst","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Beirut, Lebanon","contact_ctry_name":"Lebanon","contact_email":"yolla@kafalat.com.lb","contact_name":"Yolla Serieddine","contact_organization":"Kafalat sal","contact_phone_no":"01346255","submission_date":"2026-09-11T00:00:00Z","notice_text":"<p>The Council for Development and Reconstruction (CDR), acting on behalf of the Republic of Lebanon (the Borrower), will implement the Green Agri-food Transformation for Economic Recovery (GATE) Project, financed by the International Bank for Reconstruction and Development (IBRD). The total Project cost is US$200 million, and the Project is scheduled to close in December 2028.</p><p>Under a Subsidiary Agreement signed with CDR, Kafalat S.A.L. is mandated by the Gov. of Lebanon to implement Subcomponent 1.2 and has established a Project Management Unit (PMU) responsible for the overall management and implementation of the subcomponent. Kafalat will provide direct loans to small and medium-sized enterprises (SMEs) operating in Lebanon&#39;s agri-food and agro-tourism sectors. It will also be responsible for procurement, financial management, environmental and social (E&amp;S) risk management and safeguards compliance, monitoring and evaluation, and overall oversight of the SME lending program.</p><ol><li><strong>&nbsp;OBJECTIVE OF THE ASSIGNMENT</strong></li></ol><p>The objective of this assignment is to engage a full-time Senior Credit Analyst to support the GATE PMU Credit activities to the end of the GATE Project. The Senior Credit Analyst shall be responsible for the end-to-end credit appraisal, structuring, and recommendation of SME loan applications under Subcomponent 1.2, ensuring full compliance with the Lending Manual, Project Operations Manual (POM), and internal policies.</p><ol><li><strong>SCOPE OF WORK AND RESPONSIBILITIES</strong></li></ol><p>In order to strengthen the Project Management Unit (PMU), Kafalat is recruiting a officer to support the team in fulfilling the objectives of Sub-component 1.2 under the Gate Project. The Senior Credit Officer responsibilities will be as follows:</p><p><strong>Overall responsibilities</strong></p><p>The Senior Credit Analyst will serve as the primary relationship interface between Kafalat and SME clients across the full loan lifecycle, from initial outreach through to loan closure. Specific responsibilities include:</p><ul><li>The Senior Credit Analyst&nbsp;holds an integrated mandate spanning the full loan lifecycle. The officer serves as Kafalat&#39;s primary client-facing contact, conducting outreach, guiding applicants through the application process, communicating Credit Committee decisions, and maintaining ongoing borrower relationships through to loan closure;</li><li>Proactively identify and target eligible SME borrowers within the GATE Project&#39;s defined sectors and eligibility requirements</li><li>Conduct field visits to prospective clients&#39; business premises to assess operational reality and eligibility.</li><li>Request and verify completeness of all required documentation in accordance with the approved checklist, Lending Manual, and project eligibility criteria;</li><li>Review and validate all legal documentation of the borrower, including legal existence, ownership structure, authorized signatories, borrowing powers, and any litigation or legal encumbrances;</li><li>Conduct credit background checks through available sources (credit bureau, banking system, public registries) to assess the borrower&rsquo;s credit history and reputation;</li><li>perform Know Your Customer (KYC) and Anti-Money Laundering (AML) checks, including completion of all required forms, verification of customer identity and beneficial ownership, screening against applicable sanction lists, and ensure accurate submission and record of all KYC/AML information within the Loan Management System (LMS);</li><li>Analyze the business profile of the borrower, including operational history, ownership evolution, and key structural changes;</li><li>Review, input, and analyze financial statements for at least three consecutive years, generate and interpret key financial ratios, and assess overall financial performance and sustainability;</li><li>Evaluate repayment capacity through detailed cash flow analysis and debt service capacity assessment, including stress considerations where relevant;</li><li>Review and analyze bank account statements to validate turnover, cash flow patterns, and consistency with declared financials;</li><li>Structure the proposed loan facility, including amount, tenor, repayment schedule, and purpose, ensuring alignment with project parameters and borrower capacity;</li><li>Prepare a comprehensive and well-documented credit appraisal incorporating financial, operational, and E&amp;S considerations, with a clear recommendation (approval, rejection, or conditional approval) for submission to the Credit Manager;</li><li>Coordinate closely with the Environmental and Social (E&amp;S) Officer to support E&amp;S screening, categorization of subprojects, and identification of required risk mitigation measures in line with the ESMS and project requirements;</li><li>Assess proposed collateral to ensure compliance with internal policies, adequacy of coverage, and proper valuation by qualified third parties;</li><li>Monitor loan performance post-disbursement, including tracking repayments, identifying early warning signals, and supporting collection and recovery actions in coordination with the relevant internal units, in line with established procedures;</li><li>Ensure that all credit analysis, documentation, and decisions are accurately recorded and maintained within the Loan Management System (LMS);</li><li>Support the credit approval process by addressing queries and providing clarifications to the Credit Manager, Credit Risk Manager, and/or Credit Committee;</li><li>Follow up on approved loans to ensure fulfillment of all conditions precedent to disbursement, in coordination with the Credit Operations Function;</li><li>Ensure proper filing, archiving, and maintenance of complete and audit-ready credit files;</li><li>Ensure that loan proceeds are utilized strictly for the approved purposes by reviewing supporting documentation, including invoices and expenditure records, and verifying consistency between disbursements and underlying eligible expenditures in compliance with the Lending Manual, the POM and the Subsidiary agreement;</li><li>Conduct periodic portfolio reviews to assess SME performance and recommend corrective measures as needed.</li><li>Respond to enquiries from potential applicants, explain facility terms, eligibility criteria, and application procedures;</li><li>Guide SME applicants through the application and onboarding process, assisting with completion of the loan application package and required documentation checklist;</li><li>Maintain professional, ongoing client relationships with active borrowers, serving as their named point of contact at Kafalat for all operational matters;</li><li>Communicate Credit Committee decisions (approvals, conditions, rejections) to applicants in a clear, professional, and timely manner;</li><li>Manage borrower notifications for disbursement conditions, repayment schedules, annual review requirements, and any amendments to loan terms;</li><li>Maintain accurate client contact records and correspondence logs in the Loan Management System (LMS);</li><li>Support capacity building for SMEs to strengthen financial management and repayment discipline.</li></ul><ol><li><strong>QUALIFICATIONS AND SKILLS</strong></li></ol><ul><li>Higher degree in Economics, finance, Business or a related field. A master&rsquo;s degree or relevant professional certification is an asset</li><li>Minimum of 7 years of relevant working experience in Commercial lending operations loan portfolio management, and SME financing, preferably within a commercial bank.</li><li>Good understanding and familiarity with the World Bank safeguard policies.</li><li>Demonstrated experience in credit risk assessment, loan structuring, and monitoring of SME loans.</li><li>Excellent command of Arabic and English (written and spoken); knowledge of French is an asset.</li><li>Knowledge of the Lebanese banking sector, Lebanese Commercial Laws, SME financing challenges, and relevant regulatory environment.</li><li>Strong analytical, negotiation, and decision-making skills Working experience with the</li><li>Excellent communication and liaison skills.</li><li>Proven ability to negotiate, reschedule and troubleshoot relationships with SMEs.</li><li>Strong computer skills, including proficiency in loan tracking and management systems, and database management.</li></ul><p><strong>V. Reporting and Deliverables</strong></p><ul><li>The Senior Credit Analyst is expected to report to the Credit and Operations Manager.</li><li>Prepare quarterly portfolio review reports assessing SME performance, collateral coverage, covenant compliance, and recommending corrective measures where applicable.</li><li>Provide ad hoc reports, data extracts, and file documentation as requested by the PMU Manager, internal auditors, external auditors, or World Bank supervision missions.</li></ul><p><strong>&nbsp;&nbsp;VI. COMMENCEMENT OF ASSIGNMENT AND dURATION&nbsp;</strong><strong>&nbsp;</strong></p><p>The Senior Credit Analyst is expected to start his/her duties as soon as possible following contract signature. The initial Time-based contract duration is one year on a full-time basis, renewable annually based on satisfactory performance and availability of project funds.</p><p>&nbsp;</p>"},{"id":"OP00467751","notice_type":"Request for Expression of Interest","noticedate":"10-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-29T00:00:00Z","submission_deadline_time":"09:00","project_ctry_name":"China","project_id":"P162178","project_name":"China Food Safety Improvement Project","bid_reference_no":"GD-FSS-GAMR-CS12","bid_description":"Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Information Technology Third-Party Service Package I (Supervision Services)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Address of EOI Submission: Huaxia Road No. 49-1, Tianhe District, Guangzhou, 51000, Guangdong, China","contact_ctry_name":"China","contact_email":"zhangzhi5@cgci.gt.cn","contact_name":"Zhang Zhi, Guo Hujun","contact_organization":"China International Tendering Co., Ltd.","contact_phone_no":"010 8116 8424","submission_date":"2026-09-10T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong><u>INFORMATION TECHNOLOGY SUPERVISION SERVICES</u> </strong></p><p><strong>for China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Projec</strong></p><p>Country: People&#39;s Republic of China</p><p>Name of Project: China Food Safety Improvement Project</p><p>Loan No.: IBRD-92130</p><p>Assignment Title: Information Technology Supervision Services</p><p>Reference No.: &nbsp;GD-FSS-GAMR-CS12</p><p>The Guangdong Administration for Market Regulation has received financing from the World Bank toward the cost of the China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project, and intends to apply part of the proceeds for consulting services. The total estimated amount for this project is RMB 1.6003 million.</p><p><strong>(I) Scope of Services</strong></p><p>The service scope of this project covers the full-process supervision services for four informatization sub-projects, specifically including:</p><ol><li>The &quot;Scan-to-Trace&quot; Full-Chain Traceability Platform Project for Food in Key Fields (Categories);</li><li>The &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; System Construction Project;</li><li>The Upgrade, Renovation, and Operation Project of the Emergency Real-Time Dispatch and Command System;</li><li>The Capacity Building Project for Food-Related Personnel in Market Regulation.</li></ol><p><strong>(II) Service Content</strong></p><p>The supervision service agency shall provide full-process supervision services for the implementation of the aforementioned four informatization sub-projects, assisting the project undertaking company and the user party in carrying out their work to ensure the achievement of the predetermined project goals. In accordance with supervision work specifications, the agency shall implement full-process control over project quality, schedule, investment, contracts, and information security. This is to ensure that the construction activities are legal, compliant, reasonable, scientific, and economical, thereby reducing project construction risks and achieving both the overall project goals and the current phase goals.</p><p><strong>(III) Service Period</strong></p><p>The supervision service period for this project shall commence from the date of contract signing and continue until the project closing date (March 31, 2029).</p><p><strong>(IV) Deliverables</strong></p><p>Reports and outcome documents shall be submitted at specified dates and frequencies, including but not limited to: Mobilization Report, Supervision Plan, Detailed Supervision Implementation Rules, Supervision Weekly Report, Supervision Monthly Report, Supervision Notice, Meeting Minutes, Special Supervision Report, Supervision Work Summary Report, Project Acceptance Report, and other materials required by the construction unit and the project implementation party.</p><p><strong>(V) Agency Qualification Requirements</strong></p><p>The supervision service agency must have independently undertaken no fewer than ten information system engineering supervision services within the past three years. The relevant performance records must cover core business types such as government informatization, software platform construction, system integration, and network security. These records must sufficiently demonstrate the agency&#39;s comprehensive service capability in full-process supervision and coordination for multi-domain informatization projects.</p><p>Note: The service performance records refer to contracts signed on or after January 1, 2023.</p><p><strong>(VI) Qualifications of the Staff</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:38px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:95px\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:54px\"><p>Qty.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:206px\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:197px\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:38px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:95px\"><p>Chief Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:54px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>Fully preside over the supervision work of this project and manage the supervisory engineer team in a comprehensive manner. Responsible for the review and evaluation of major system changes in the project, and comprehensively in charge of risk management, information security, and data security management during the project implementation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:197px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than five years of experience in information system engineering supervision and management.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:38px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:95px\"><p>Representative of Chief Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:54px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>Responsible for the supervision work designated or assigned by the Chief Supervisory Engineer. Authorized by the Chief Supervisory Engineer, exercise part of the duties and powers of the Chief Supervisory Engineer, and carry out the project supervision implementation work.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:197px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than five years of experience in information system engineering supervision.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:38px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:95px\"><p>Specialty Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:54px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>Responsible for carrying out the implementation work of informatization project supervision.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:197px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than three years of experience in information system engineering supervision.</p></td></tr></tbody></table><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>The Guangdong Administration for Market Regulation now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: the overall competence and strength of the Consultant, quality control and project management capabilities, understanding of the assignment, relevant experience and past performance, proposed team composition, preliminary work plan, and a brief technical approach. Key Experts will be evaluated at the shortlisting stage.</p><p><strong>(VII) Contents of this Consultation</strong></p><ol><li>Expression of interest in undertaking the supervision services for this project;</li><li>Agency profile and core advantages;</li><li>List of project performance records;</li><li>Key points of the preliminary work plan and work schedule;</li><li>Preliminary staffing plan;</li><li>Proposed core team (including resume summaries of the Project Manager and key experts).</li></ol><p><strong>(VIII) Submission Materials</strong></p><ol><li>&quot;Expression of Interest Letter&quot; (or &quot;Feedback Letter&quot;) submitted by the supervision service agency;</li><li>Agency profile;</li><li>Summary of project performance records (specifying the project name, client, service content, and service period);</li><li>Simplified proposal (briefly outlining key points; a detailed proposal is not required);</li><li>Preliminary work schedule;</li><li>Key team experts (personnel profiles must be provided);</li><li>Any other materials deemed necessary by the supervision service agency.</li></ol><p>Note: All the above materials must be stamped with the official seal of the consulting agency.</p><p>Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Borrower. Without limitation on the generality of the foregoing, Consultants shall not be hired under the circumstances set forth below:</p><ol><li><em>a firm that has been engaged by the Borrower to provide Goods, Works, or Non-Consulting Services for a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), shall be disqualified from providing Consulting Services resulting from, or directly related to, those Goods, Works, or Non-Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract; a firm that has been engaged by the Borrower to provide Consulting Services for the preparation or implementation of a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that Consulting firm), shall be disqualified from subsequently providing Goods, Works, or Non-Consulting Services resulting from, or directly related to those Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract;</em></li><li><em>Neither a Consultant (including personnel and sub-consultants), nor an affiliate (that directly or indirectly controls, is controlled by, or is under common control with that Consultant), shall be hired for any assignment that, by its nature, creates a conflict of interest with another assignment of the Consultant;</em></li><li><em>Consultants (including their experts and other personnel, and sub-consultants), that have a close business or family relationship with a professional staff of the Borrower, or of the project implementing agency, or of a recipient of a part of the Bank&rsquo;s financing, or any other party representing or acting on behalf of the Borrower, that is directly or indirectly involved in any part of: i. the preparation of the ToR for the assignment; ii. the selection process for the contract; or iii. the supervision of the contract; may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.</em></li></ol><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the <strong>CQS method</strong> set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours. Office hours are <strong>from 09:00 to 17:00 on working days from September 11 to September 28, 2026</strong></p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by 09:00 on September 29, 2026.</p><p>Tender Agency: China International Tendering Co., Ltd.</p><p>Attn: Zhang Zhi, Guo Hujun</p><p>Title: Project Manager</p><p>Address: Huaxia Road No. 49-1, Tianhe District, Guangzhou, Guangdong Province, China</p><p>Postal Code: 51000</p><p>Tel.: 010-81168424; 010-81168460</p><p>E-mail: zhangzhi5@cgci.gt.cn; guohujun@gt.cn</p><p>&nbsp;</p><p>Employer: Guangdong Administration for Market Regulation</p><p>Attn: Chen Lin</p><p>Title: Special Cadre, World Bank Loan Project Office</p><p>Address: No. 363 West Huangpu Avenue, Tianhe District, Guangzhou, Guangdong Province, China</p><p>Tel.: 020-38835493</p><p>E-mail: gdsjj_xietiaoyingji@gd.gov.cn</p><p>&nbsp;</p><p><u>Annex: Term of Reference (TOR)</u></p><p><strong>TERM OF REFERENCE</strong></p><p>To ensure the implementation of the World Bank China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Information Technology Third-Party Service Package I (Supervision Services)of the Guangdong Administration for Market Regulationand to achieve the informatization construction goals of the project, the Guangdong Administration for Market Regulation intends to engage a third-party service agency to carry out the implementation of this project.</p><p><strong>I. Background and Description</strong></p><p>The World Bank Loan China Food Safety Demonstration Project officially entered into force on March 21, 2024, with an implementation period until March 31, 2029. It aims to comprehensively enhance the modern governance capacity for food safety at both national and local levels. As a key implementer of this project in Guangdong Province, the Guangdong Administration for Market Regulation plans to apply for a World Bank loan of 10 million US dollars and will precisely support the achievement of the project goals through the construction of six core sub-projects:</p><p><strong>i. </strong>Develop a full-chain traceability platform for &quot;coding, tracing, and recalling&quot; food in key areas, enabling whole-process traceability and risk early warning with 15 functional modules and 359 functional points;</p><p><strong>ii.</strong> Build the &quot;Internet + Clear Kitchen and Bright Stove&quot; system under the Guangdong Food Safety initiative, covering intelligent video supervision of scenarios such as elderly care and campus canteens;</p><p><strong>iii.</strong> Upgrade and transform the emergency real-time dispatching and command system, and improve the accident emergency response mechanism;</p><p><strong>iv.</strong> Carry out a capacity improvement project for food-related personnel in the market supervision field, including the development of a learning and assessment system, the production of 75 course videos, and the organization of skill competitions;</p><p><strong>v.</strong> Establish a high-quality food standard system and conduct promotion activities, developing no less than 30 standards and carrying out quality monitoring within two years;</p><p><strong>vi.</strong> Provide professional consulting services throughout the entire project implementation process.</p><p>To ensure the high-quality implementation of the above-mentioned construction content, we plan to refer to advanced practices from other World Bank projects to further optimize procurement management and improve service coordination efficiency; in the next phase of actual procurement operations, while keeping the total project budget unchanged, we intend to integrate the supervision services of the four projects&mdash;the &quot;Coding, Tracing, and Recalling&quot; Full-Chain Traceability Platform Project for Food in Key Areas (or Key Varieties), the Guangdong Food Safety &quot;Internet + Clear Kitchen and Bright Stove&quot; System Construction Project, the Emergency Real-Time Dispatching and Command System Upgrade, Transformation, and Operation Project, and the Capacity Improvement Project for Food-Related Personnel in the Market Supervision Field&mdash;into a single package for unified procurement and management, so as to ensure the smooth achievement of the project&#39;s construction goals.</p><p><strong>II. Objectives</strong></p><p>To ensure the high-quality implementation of the informatization sub-projects under the World Bank Loan Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project, third-party supervision services will be provided throughout the entire process for four informatization sub-projects: the &quot;Coding, Tracing, and Recalling&quot; full-chain traceability platform, the &quot;Internet + Clear Kitchen and Bright Stove&quot; intelligent supervision system, the emergency real-time dispatching and command system, and the learning and assessment system for capacity improvement of food-related personnel. Through full-cycle, closed-loop management and control covering quality, progress, investment, changes, contract compliance, safety, intellectual property, multi-party collaboration, and documentation during project construction, we will ensure that project construction activities are legal, compliant, economical, and scientific; strictly control risks such as project overspending, delays, and quality defects; and guarantee the project is completed with high quality within the agreed schedule and budget. With the core goal of comprehensively enhancing modern governance capacity for food safety, we will build a full-chain management mechanism covering risk identification, early warning response, and closed-loop disposal through the system construction and coordinated advancement of the informatization sub-projects. This will provide a solid data foundation and institutional guarantee for the scientific calculation of the &quot;proportion of early warnings for which mitigation measures have been initiated,&quot; realize systematic training for food safety inspectors and supervisors while quantifying the participation ratio of female supervisors, comprehensively improve the quality and management level of project implementation, ensure that the collection, accounting, and reporting of all indicator data comply with World Bank standards, and help promote the efficient implementation of the World Bank project.</p><p><strong>III. Service Overview</strong></p><p>The total estimated amount for this project is RMB 1.6003 million.</p><p><strong>(I) Scope of Services</strong></p><p>The service scope of this project covers the full-process supervision services for four informatization sub-projects, specifically including:</p><ol><li>The &quot;Scan-to-Trace&quot; Full-Chain Traceability Platform Project for Food in Key Fields (Categories);</li><li>The &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; System Construction Project;</li><li>The Upgrade, Renovation, and Operation Project of the Emergency Real-Time Dispatch and Command System;</li><li>The Capacity Building Project for Food-Related Personnel in Market Regulation.</li></ol><p><strong>(II) Service Content</strong></p><p>The supervision service agency shall provide full-process supervision services for the implementation of the aforementioned four informatization sub-projects, assisting the project undertaking company and the user party in carrying out their work to ensure the achievement of the predetermined project goals. In accordance with supervision work specifications, the agency shall implement full-process control over project quality, schedule, investment, contracts, and information security. This is to ensure that the construction activities are legal, compliant, reasonable, scientific, and economical, thereby reducing project construction risks and achieving both the overall project goals and the current phase goals.For details:</p><p>&nbsp;</p><ol><li><strong>Quality Control</strong></li></ol><p>Adopt a full-process control mechanism of pre-prevention, in-process management and control, and post rectification. Control the quality of system development in accordance with regulatory standards, project contracts and design documents; regularly review project documents, issue supervision briefs and conduct quantitative evaluation; assist in reviewing design schemes and software selection, and supervise software testing, installation and commissioning links; formulate project acceptance standards and disposal plans, urge the implementation unit to rectify quality defects and follow up the operation and maintenance services during the warranty period. Simultaneously control the training quality, review the training plan, supervise the implementation of training and recheck the training summary.<br />&nbsp;</p><ol><li><strong>Schedule Control</strong><br />Review the development schedule plans at all levels of the implementation unit and verify their feasibility; track the progress of requirements, coding, testing and online stages in real time, and urge dynamic adjustment of the construction period; put forward optimization schemes in a timely manner and urge implementation of rectification when there is a serious deviation in the construction period; realize visual control of development progress relying on standardized project management tools.<br />&nbsp;</li><li><strong>Investment Control</strong><br />Optimize the software development implementation plan, reasonably control the costs of customized development, third-party component procurement, etc., to ensure the cost-effectiveness of capital investment; track the use of funds in real time, give early warning and adjustment suggestions in time if there is a large deviation in the budget, and strictly control the risk of overspending.<br />&nbsp;</li><li><strong>Change Control</strong><br />Unify the management of various changes such as software requirements, functions, interfaces and architecture, and standardize the whole process of change application, impact assessment, multi-party review, approval and implementation, and regression testing; evaluate the impact of changes on quality, schedule, investment and safety, eliminate disorderly demand spread, completely retain the change ledger and complete the change filing of local government projects.<br />&nbsp;</li><li><strong>contract management</strong><br />Assist the construction unit in drafting, reviewing and signing software development and supporting procurement contracts; track the performance of the contract throughout the process; coordinate the handling of construction period extension, change, breach of contract, claim, subcontracting and project dispute mediation; review the payment application of the implementation unit according to the contract terms and issue supervision review opinions.<br />&nbsp;</li><li><strong>Document Information Management</strong><br />Unify the collection and management of a full set of software project materials such as requirements, design, testing, operation and maintenance, and training; regularly submit project dynamic materials to the construction unit; urge the implementation unit to sort out and file technical materials in accordance with specifications; transmit notices and contact sheets issued by the construction unit; report software quality problems to the superior immediately and supervise the closed-loop rectification.<br />&nbsp;</li><li><strong>Safety and Intellectual Property Management</strong><br />Supervise the hierarchical protection of government business data and internal materials throughout the process to strictly prevent unauthorized access and leakage of data; control the operation safety of development, testing and online links, implement code security and relevant requirements of classified protection, and eliminate safety accidents. At the same time, protect the intellectual property rights of project development achievements, software source codes and customized functions, and strictly prohibit illegal reuse or private external transmission of achievements.<br />&nbsp;</li><li><strong>Organization and Coordination</strong></li></ol><p>Establish a standardized project meeting mechanism, organize weekly meetings, demand coordination meetings, technical special meetings, problem notification meetings and phased acceptance meetings, and completely retain meeting minutes; coordinate the work relations among the construction unit, business departments, development and implementation units and software and hardware suppliers, and build a normalized communication channel; coordinate to solve various problems such as demand differences, development (stuck points), testing disputes, etc., and simultaneously implement the project safety supervision objectives.<br /><strong>(III) Service Period</strong></p><p>The supervision service period for this project shall commence from the date of contract signing and continue until the project closing date (March 31, 2029).</p><p>&nbsp;</p><p><strong>IV Deliverables, Result Review and Acceptance</strong></p><p><strong>a.Deliverables</strong></p><p>Supervision Service Institution&rsquo;s Key Report Deliverables During the Project Implementation Periodfor details,</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:47px\"><p>NO.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:113px\"><p>Report Name</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:170px\"><p>Submission Date/Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:219px\"><p>Note</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Site Entry Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted within the specified time limit after the contract is signed</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Clarify the implementation plan for each work item</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Supervision Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>In the early stage of project initiation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Compiled under the organization of the Chief Supervision Engineer, reviewed by the company&#39;s technical department, and then submitted to the construction unit</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Supervision Implementation Rules</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>In the early stage of project initiation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Compiled by the Professional Supervision Engineer, approved by the Chief Supervision Engineer, and then submitted to the construction unit</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Weekly Supervision Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>One copy submitted per week</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Report on project dynamics, supervision status, existing problems and suggestions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Monthly Supervision Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>One copy submitted per month</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Report on project dynamics, supervision status, existing problems and suggestions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Supervision Notice</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>One copy submitted each time it is issued</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>After obtaining the consent of the construction unit, issue supervision instructions to the project implementation party</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Meeting Minutes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>One copy submitted after each meeting</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Cover project regular meetings, coordination meetings, technical seminars, etc., and distributed to all participating units</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Special Supervision Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted according to the actual needs of the project</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Special report or suggestion submitted to the construction unit for specific project situations</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Materials requiring approval by the construction unit</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted according to the actual project milestones</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Including engineering changes, implementation plans, various progress schedules, project progress payments, opinions on quality accident handling, construction period extension reports, etc. (the supervisor shall issue opinions first)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Other materials declared by the project implementation party</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted according to the actual project milestones</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Other materials declared by the project implementation party that require approval by the construction unit</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>11</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Materials requiring joint review and signature by multiple parties</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted according to the actual project milestones</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Materials requiring joint review and signature by the construction unit, supervisor, implementation party and other parties</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Supervision Work Summary Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted before the end of the contract</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Including project implementation overview, supervision contract performance, control status from various dimensions, supervision work effectiveness, summary evaluation and suggestions, etc.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>13</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Project Acceptance Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Submitted when the supervised project passes acceptance</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>After the supervised project passes acceptance, a formal acceptance report is formed</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>14</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Other Service Deliverables</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:170px\"><p>Output as needed</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:219px\"><p>Other materials required by the construction unit</p></td></tr></tbody></table><p><strong>b. Result Review and Acceptance</strong></p><p>After the Project Office reviews and approves the deliverable reports submitted by the supervision service agency, for the deliverable documents that need to be submitted to the World Bank for review in accordance with regulations, the supervision service agency shall cooperate with the Project Office to complete the submission. The phased deliverable shall be formally considered completed only after obtaining the World Bank&#39;s no-objection opinion. All deliverable reports must fully conform to the service content specified in this Terms of Reference, with standardized format, complete content, and true and accurate data.<br />&nbsp;</p><p><strong>V Agency and Personnel Qualification Requirements</strong></p><p>a. <strong>Agency Qualification Requirements</strong></p><p>The supervision service agency must have independently undertaken no fewer than ten information system engineering supervision services within the past three years. The relevant performance records must cover core business types such as government informatization, software platform construction, system integration, and network security. These records must sufficiently demonstrate the agency&#39;s comprehensive service capability in full-process supervision and coordination for multi-domain informatization projects.</p><p><strong>b. Personnel Qualification Requirements</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:71px; vertical-align:top; width:47px\"><p>NO.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:71px; vertical-align:top; width:66px\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:71px; vertical-align:top; width:51px\"><p>Qty</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:71px; width:182px\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:71px; width:206px\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:66px\"><p>Chief Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:51px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:182px\"><p>Fully preside over the supervision work of this project and manage the supervisory engineer team in a comprehensive manner. Responsible for the review and evaluation of major system changes in the project, and comprehensively in charge of risk management, information security, and data security management during the project implementation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than five years of experience in information system engineering supervision and management.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:66px\"><p>Representative of Chief Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:51px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:182px\"><p>Responsible for the supervision work designated or assigned by the Chief Supervisory Engineer. Authorized by the Chief Supervisory Engineer, exercise part of the duties and powers of the Chief Supervisory Engineer, and carry out the project supervision implementation work.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than five years of experience in information system engineering supervision.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:47px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:66px\"><p>Specialty Supervisory Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:51px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:182px\"><p>Responsible for carrying out the implementation work of informatization project supervision.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:206px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess an Information System Supervisor certificate and competency certificates in informatization project management, software, network, big data, or system analysis;<br />3. More than three years of experience in information system engineering supervision.</p></td></tr></tbody></table><p><strong>VI. Facilities and Personnel Provided by the Client</strong></p><p>To ensure the smooth implementation of the service, the Client will provide the following necessary assistance and services:</p><p><strong>a.</strong> Relevant project documents, reports, annual work plans and other materials.</p><p><strong>b.</strong>Designate or entrust staff to coordinate with the service provider and carry out related work.</p>"},{"id":"OP00468227","notice_type":"Request for Expression of Interest","noticedate":"10-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-30T00:00:00Z","submission_deadline_time":"09:00","project_ctry_name":"China","project_id":"P162178","project_name":"China Food Safety Improvement Project","bid_reference_no":"GD-FSS-GAMR-CS13","bid_description":"Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Information Technology Service Package II (Cybersecurity Level Protection Assessment Service and Commercial Cryptography Application Security Evaluation Service)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"South Tower, Bld Jinbintengyue, Huaxia Road No.49-1, Tianhe District, Guangzhou, Guangdong, China","contact_ctry_name":"China","contact_email":"zhangzhi5@cgci.gt.cn","contact_name":"Zhang Zhi, Guo Hujun","contact_organization":"China International Tendering Co., Ltd.","contact_phone_no":"010 8116 8424","submission_date":"2026-09-10T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>INFORMATION TECHNOLOGY CYBERSECURITY LEVEL PROTECTION ASSESSMENT SERVICE AND COMMERCIAL CRYPTOGRAPHY APPLICATION SECURITY EVALUATION SERVICE </strong></p><p><strong>for&nbsp;</strong></p><p><strong>China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project</strong></p><p>Country: People&#39;s Republic of China</p><p>Name of Project: China Food Safety Improvement Project</p><p>Loan No.: IBRD-92130</p><p>Assignment Title: Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Information Technology Third-Party Service Package II (Cybersecurity Level Protection Assessment Service and Commercial Cryptography Application Security Evaluation Service)</p><p>Reference No.:&nbsp; GD-FSS-GAMR-CS13</p><p>The Guangdong Administration for Market Regulation has received financing from the World Bank toward the cost of the China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project, and intends to apply part of the proceeds for consulting services. The total estimated amount for this project is RMB 0.56 million.</p><p><strong>(I) Scope of Service</strong></p><p>The service scope of this project covers the Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services required for four informatization projects, specifically including:</p><ol><li>The &quot;Scan-to-Trace&quot; Full-Chain Traceability Platform Project for Food in Key Fields (Categories);</li><li>The &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; System Construction Project;</li><li>The Upgrade, Renovation, and Operation Project of the Emergency Real-Time Dispatch and Command System;</li><li>The Capacity Building Project for Food-Related Personnel in Market Regulation.</li></ol><p><strong>(II) Service Contents</strong></p><p>1. Cybersecurity Level Protection Assessment Services</p><p>Based on the assessment results of security technology and security management controls, as well as the overall system assessment, the service agency shall conduct a comprehensive assessment of the information system in accordance with the corresponding level standards and provide relevant security review opinions. This specifically includes two aspects: First, security control assessment, which primarily evaluates the implementation and configuration of basic security controls required by the cybersecurity level protection standards within the information system. Second, overall system assessment, which primarily analyzes the overall security of the information system. The security control assessment serves as the foundation for the overall security assessment of the information system.</p><p>2. Commercial Cryptography Application Security Assessment Services</p><p>The service agency shall provide security assessment services for systems upgraded with domestic cryptography. For the upgraded national cryptographic systems, the agency shall formulate an assessment plan, conduct the assessment, propose rectification opinions, and track the rectification progress in accordance with national specifications, thereby providing a basis for project acceptance. Through this assessment service, the agency will comprehensively understand the current status of cryptography application in the relevant information systems and evaluate the gap between the current status and the corresponding levels stipulated in the Information Security Technology&mdash;Basic Requirements for Cryptographic Application of Information Systems (GB/T 39786-2021). This aims to achieve the goals of promoting construction, rectification, and application through assessment. On-site assessments and technical verifications will be conducted covering physical and environmental security, network and communication security, equipment and computing security, application and data security, key management, and security management. The agency will identify weak links and potential risk hazards in cryptographic applications, propose targeted rectification recommendations, and ensure the compliance, correctness, and effectiveness of cryptographic applications. Furthermore, cryptographic security protection measures will be precisely implemented to guarantee the authenticity, confidentiality, integrity, and non-repudiation of the information systems.</p><p><strong>(III) Service Period</strong></p><p>The service period for this project shall commence from the date of contract signing and continue until the project closing date (March 31, 2029). The specific service timeline will be implemented in phases based on the system launch schedule of the four informatization projects.</p><p><strong>(IV) Deliverables</strong></p><p>The deliverables required for this project are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:56px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:170px\"><p>Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:364px\"><p>Submission Date/Phase</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Mobilization Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>Within 10 working days after contract signing and system launch (subject to the actual system launch date).</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Information System Rectification List</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>Within 10 working days after the completion of the gap assessment.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Cybersecurity Level Protection Assessment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>For Level 3 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the acceptance requirements. For the annual re-assessment report: The annual re-assessment must be initiated 3 months before the expiration of the previous year&#39;s assessment report, and the annual assessment report must be issued before the expiration of the previous year&#39;s report.<br />For Level 2 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the acceptance requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Filing Materials and Filing Receipt</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>Issued within 10 working days after the assessment report is stamped by both parties and submitted online to the cyber police department.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Commercial Cryptography Application Rectification List</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>Within 10 working days after the completion of the gap assessment.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Commercial Cryptography Application Security Assessment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>For Level 3 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the cryptographic assessment acceptance requirements. For the annual re-assessment report: The annual re-assessment must be initiated 3 months before the expiration of the previous year&#39;s assessment report, and the annual assessment report must be issued before the expiration of the previous year&#39;s report.<br />For Level 2 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the cryptographic assessment acceptance requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:56px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:170px\"><p>Filing Materials and Filing Receipt</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:364px\"><p>Issued within 10 working days after the assessment report is stamped by both parties and submitted to the Cryptography Administration.</p></td></tr></tbody></table><p>Upon receiving the deliverable reports submitted by the assessment service agency, the Project Management Office (PMO) shall review them. For deliverable documents that are required to be submitted to the World Bank for review according to regulations, the assessment service agency shall assist the PMO in completing the submission. The phased deliverables shall be officially considered closed only after obtaining the World Bank&#39;s &quot;no objection.&quot; All deliverable reports must fully align with the service content specified in this Terms of Reference (TOR). They must be standardized in format, comprehensive in content, and authentic and accurate in data.</p><p><strong>(V) Consultant Qualification Requirements</strong></p><p>The service agency must possess the Cybersecurity Service (Level Protection Assessment) Certification Certificate issued by the Third Research Institute of the Ministry of Public Security, as well as the Commercial Cryptography Testing Agency (Commercial Cryptography Application Security Assessment) Qualification Certificate issued by the State Cryptography Administration. Within the past three years, the agency must have independently undertaken no fewer than five service projects for Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment. The relevant performance records must cover related types such as government informatization, software platform construction, system integration, and network security. These records must sufficiently demonstrate the agency&#39;s capability in compliance assessment and comprehensive security services for informatization projects.</p><p>Regarding the assessment tools required for the service agency, different testing tools shall be equipped based on the testing content of this project. Examples include comprehensive management software for level protection assessment, network security inspection and early warning management software, quality monitoring management software for level protection assessment, level protection assessment management and risk assessment software, and commercial cryptography application security assessment management systems. The service agency shall provide an equipment plan for the testing tools to be used in this project within the technical proposal. (Note: For purchased assessment tools, procurement contracts and invoices must be provided; for self-developed tools, software copyrights or relevant patent certificates must be provided).</p><p><strong>(VI) Expert Qualifications</strong></p><p>The consulting service agency shall primarily deploy key personnel and teams, including the Project Manager, Technical Director, Level Protection Assessment Task Force, and Cryptographic Assessment Task Force. The qualification requirements and functional responsibilities for each key position are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:99%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:38px; width:43px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:107px\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:58px\"><p>Qty.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:190px\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:193px\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:43px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:107px\"><p>Project Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:58px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:190px\"><p>Responsible for overall coordination, resource allocation, and cross-departmental communication throughout the entire project lifecycle. Control the quality of all deliverables, including the mobilization report and assessment reports. Organize project acceptance and assist in completing the filing (record-keeping) process.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:193px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 10 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:43px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:107px\"><p>Technical Director</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:58px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:190px\"><p>Take the lead in drafting the implementation plans for level protection and cryptographic assessments. Provide on-site technical supervision, analyze complex hidden risks, provide technical solutions for rectification and reinforcement, and review the objectivity and accuracy of the assessment reports.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:193px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 10 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:43px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:107px\"><p>Level Protection Assessment Task Force</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:58px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:190px\"><p>Responsible for on-site investigation, asset inventory, penetration testing, and security control assessment. Draft the &quot;Information System Rectification List&quot; and the &quot;Cybersecurity Level Protection Assessment Report,&quot; and assist in completing the filing with the cyber police department.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:193px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 3 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:43px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:107px\"><p>Cryptographic Assessment Task Force</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:58px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:190px\"><p>Responsible for compliance verification and risk identification of systems upgraded with national cryptography. Verify the compliance, correctness, and effectiveness of domestic cryptographic algorithm (SM2/SM3/SM4) invocations. Draft the &quot;Commercial Cryptography Application Security Assessment Report&quot; and rectification lists, and assist in completing the filing with the cryptography administration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:193px\"><p>1. Bachelor&#39;s degree or above;<br />2. Familiar with the GB/T 39786-2021 standard; practitioner in commercial cryptography application security assessment;<br />3. More than 3 years of practical experience in domestic cryptography upgrade and compliance assessment.</p></td></tr></tbody></table><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>The Guangdong Administration for Market Regulation now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: the overall competence and strength of the Consultant, quality control and project management capabilities, understanding of the assignment, relevant experience and past performance, proposed team composition, preliminary work plan, and a brief technical approach. Key Experts will be evaluated at the shortlisting stage.</p><p><strong>(VII) Contents of this Consultation</strong></p><p>a.Expression of interest in undertaking the supervision services for this project;</p><p>b.Agency profile and core advantages;</p><p>c.List of project performance records;</p><p>d.Key points of the preliminary work plan and work schedule;</p><p>e.Preliminary staffing plan;</p><p>f.Proposed core team (including resume summaries of the Project Manager and key experts).</p><p><strong>(VIII) Submission Materials</strong></p><p>a.&quot;Expression of Interest Letter&quot; (or &quot;Feedback Letter&quot;) submitted by the supervision service agency;</p><p>b.Agency profile;</p><p>c.Summary of project performance records (specifying the project name, client, service content, and service period);</p><p>d.Simplified proposal (briefly outlining key points; a detailed proposal is not required);</p><p>e.Preliminary work schedule;</p><p>f.Key team experts (personnel profiles must be provided);</p><p>g.Any other materials deemed necessary by the supervision service agency.</p><p>Note: All the above materials must be stamped with the official seal of the consulting agency.</p><p>Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Borrower. Without limitation on the generality of the foregoing, Consultants shall not be hired under the circumstances set forth below:</p><p>a. a firm that has been engaged by the Borrower to provide Goods, Works, or Non-Consulting Services for a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), shall be disqualified from providing Consulting Services resulting from, or directly related to, those Goods, Works, or Non-Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract; a firm that has been engaged by the Borrower to provide Consulting Services for the preparation or implementation of a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that Consulting firm), shall be disqualified from subsequently providing Goods, Works, or Non-Consulting Services resulting from, or directly related to those Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract;</p><p>b. neither a Consultant (including personnel and sub-consultants), nor an affiliate (that directly or indirectly controls, is controlled by, or is under common control with that Consultant), shall be hired for any assignment that, by its nature, creates a conflict of interest with another assignment of the Consultant;</p><p>c. Consultants (including their experts and other personnel, and sub-consultants), that have a close business or family relationship with a professional staff of the Borrower, or of the project implementing agency, or of a recipient of a part of the Bank&rsquo;s financing, or any other party representing or acting on behalf of the Borrower, that is directly or indirectly involved in any part of: i. the preparation of the ToR for the assignment; ii. the selection process for the contract; or iii. the supervision of the contract; may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the CQS method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours. Office hours are from 09:00 to 17:00 on working days from September 12 to September 29, 2026</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by 09:00 on September 30, 2026.</p><p>Tender Agency: China International Tendering Co., Ltd.</p><p>Attn: Zhang Zhi, Guo Hujun</p><p>Title: Project Manager</p><p>Address: Room 2003B, South Tower, Jinbin Tengyue Building, Huaxia Road No. 49-1, Tianhe District, Guangzhou, Guangdong Province, China</p><p>Postal Code:51000</p><p>Tel.: 010-81168424; 010-81168460</p><p>E-mail: zhangzhi5@cgci.gt.cn; guohujun@gt.cn</p><p>&nbsp;</p><p>Employer: Guangdong Administration for Market Regulation</p><p>Attn: Chen Lin</p><p>Title: Special Cadre, World Bank Loan Project Office</p><p>Address: No. 363 West Huangpu Avenue, Tianhe District, Guangzhou, Guangdong Province, China</p><p>Tel.: 020-38835493</p><p>E-mail: gdsjj_xietiaoyingji@gd.gov.cn</p><p>&nbsp;</p><p>Annex: Detailed Term of Reference (TOR)</p><p><strong>TERM OF REFERENCE</strong></p><p>To ensure the implementation of the World Bank China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Information Technology Third-Party Service Package II (Cybersecurity Level Protection Assessment Service and Commercial Cryptography Application Security Evaluation Service) of the Guangdong Administration for Market Regulationand to guarantee the achievement of the project&#39;s objectives, the Guangdong Administration for Market Regulation intends to select a service agency through procurement to be responsible for the implementation of this project.</p><p>&nbsp;</p><p><strong>I. Background and Description</strong></p><p>The World Bank Loan China Food Safety Demonstration Project officially entered into force on March 21, 2024, with an implementation period until March 31, 2029. It aims to comprehensively enhance the modern governance capacity for food safety at both national and local levels. As a key implementer of this project in Guangdong Province, the Guangdong Administration for Market Regulation plans to apply for a World Bank loan of 10 million US dollars and will precisely support the achievement of the project goals through the construction of six core sub-projects:</p><p><strong>i. </strong>Develop a full-chain traceability platform for &quot;coding, tracing, and recalling&quot; food in key areas, enabling whole-process traceability and risk early warning with 15 functional modules and 359 functional points;</p><p><strong>ii.</strong> Build the &quot;Internet + Clear Kitchen and Bright Stove&quot; system under the Guangdong Food Safety initiative, covering intelligent video supervision of scenarios such as elderly care and campus canteens;</p><p><strong>iii.</strong> Upgrade and transform the emergency real-time dispatching and command system, and improve the accident emergency response mechanism;</p><p><strong>iv.</strong> Carry out a capacity improvement project for food-related personnel in the market supervision field, including the development of a learning and assessment system, the production of 75 course videos, and the organization of skill competitions;</p><p><strong>v.</strong> Establish a high-quality food standard system and conduct promotion activities, developing no less than 30 standards and carrying out quality monitoring within two years;</p><p>vi. Provide professional consulting services throughout the entire project implementation process.</p><p>To ensure the high-quality implementation of the above-mentioned construction content, we plan to refer to advanced practices from other World Bank projects to further optimize procurement management and improve service coordination efficiency; in the next phase of actual procurement operations, while keeping the total project budget unchanged, we intend to integrate the network security level protection assessment services and commercial cryptography application security assessment services for these 4 projects&mdash;the &quot;Coding, Tracing, and Recalling&quot; Full-Chain Traceability Platform Project for Food in Key Areas (or Key Varieties), the Guangdong Food Safety &quot;Internet + Clear Kitchen and Bright Stove&quot; System Construction Project, the Emergency Real-Time Dispatching and Command System Upgrade, Transformation, and Operation Project, and the Capacity Improvement Project for Food-Related Personnel in the Market Supervision Field&mdash;into a single package for unified procurement and management, so as to ensure the smooth achievement of the project&#39;s construction goals.</p><p>&nbsp;</p><p><strong>II. Objectives</strong></p><p>The core objective of this project is to comprehensively enhance the modern governance capacity for food safety. Through the in-depth integration and linkage of the &quot;Code Tracing&quot; full-chain traceability platform, the &quot;Internet + Smart Kitchen &amp; Bright Stove&quot; intelligent supervision system, and the emergency real-time dispatch and command system, a full-chain management mechanism covering risk identification, early warning response, and closed-loop disposal will be established, providing a data foundation and institutional guarantee for scientifically calculating result indicators such as the &quot;proportion of early warnings for which mitigation measures have been initiated.&quot; Additionally, the food-related personnel capacity improvement learning and assessment system will enable systematic training for regulatory personnel and quantify the participation proportion of female regulatory personnel.</p><p>The core purpose is to conduct a comprehensive and objective security assessment of the above-mentioned information systems in accordance with relevant national standards and norms, accurately identify and locate risks and weaknesses in the systems&#39; network security and cryptographic applications, and propose targeted rectification suggestions accordingly. Through the approach of &quot;promoting construction through assessment, promoting reform through assessment, and promoting application through assessment,&quot; it will ultimately ensure that all information systems meet the requirements of compliance, correctness, and effectiveness in terms of network security protection and cryptographic applications. This will provide a solid guarantee for the smooth acceptance and safe operation of the project, ensure that the collection, accounting, and reporting of all indicator data comply with World Bank norms, and help promote the efficient implementation of the World Bank project.</p><p>&nbsp;</p><p><strong>III. Service Overview</strong></p><p>The total estimated amount for this project is RMB 0.56 million.</p><p><strong>(I) Scope of Services</strong></p><p>The service scope of this project covers the Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services required for four informatization projects, specifically including:</p><ol><li>The &quot;Scan-to-Trace&quot; Full-Chain Traceability Platform Project for Food in Key Fields (Categories);</li><li>The &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; System Construction Project;</li><li>The Upgrade, Renovation, and Operation Project of the Emergency Real-Time Dispatch and Command System;</li><li>The Capacity Building Project for Food-Related Personnel in Market Regulation.</li></ol><p><strong>(II) Service Content</strong></p><p><strong>a. Cybersecurity Level Protection Assessment Services</strong><br />Based on the assessment results of security technology and security management controls, as well as the overall system assessment, the service agency shall conduct a comprehensive assessment of the information system in accordance with the corresponding level standards and provide relevant security review opinions. This specifically includes two aspects: First, security control assessment, which primarily evaluates the implementation and configuration of basic security controls required by the cybersecurity level protection standards within the information system. Second, overall system assessment, which primarily analyzes the overall security of the information system. The security control assessment serves as the foundation for the overall security assessment of the information system.</p><p>&nbsp;</p><p><strong>b. Commercial Cryptography Application Security Assessment Services</strong></p><p>The service agency shall provide security assessment services for systems upgraded with domestic cryptography. For the upgraded national cryptographic systems, the agency shall formulate an assessment plan, conduct the assessment, propose rectification opinions, and track the rectification progress in accordance with national specifications, thereby providing a basis for project acceptance. Through this assessment service, the agency will comprehensively understand the current status of cryptography application in the relevant information systems and evaluate the gap between the current status and the corresponding levels stipulated in the Information Security Technology&mdash;Basic Requirements for Cryptographic Application of Information Systems (GB/T 39786-2021). This aims to achieve the goals of promoting construction, rectification, and application through assessment. On-site assessments and technical verifications will be conducted covering physical and environmental security, network and communication security, equipment and computing security, application and data security, key management, and security management. The agency will identify weak links and potential risk hazards in cryptographic applications, propose targeted rectification recommendations, and ensure the compliance, correctness, and effectiveness of cryptographic applications. Furthermore, cryptographic security protection measures will be precisely implemented to guarantee the authenticity, confidentiality, integrity, and non-repudiation of the information systems.</p><p>&nbsp;</p><p><strong>(III) Service Period</strong></p><p>The service period for this project shall commence from the date of contract signing and continue until the project closing date (March 31, 2029). The specific service timeline will be implemented in phases based on the system launch schedule of the four informatization projects.</p><p>&nbsp;</p><p><strong>IV Deliverables, Result Review and Acceptance</strong></p><p><strong>a.Deliverables</strong></p><p>The deliverables required for this project are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:66px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:113px\"><p>Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:374px\"><p>Submission Date/Phase</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Mobilization Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>Within 10 working days after contract signing and system launch (subject to the actual system launch date).</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Information System Rectification List</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>Within 10 working days after the completion of the gap assessment.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Cybersecurity Level Protection Assessment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:374px\"><p>For Level 3 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the acceptance requirements. For the annual re-assessment report: The annual re-assessment must be initiated 3 months before the expiration of the previous year&#39;s assessment report, and the annual assessment report must be issued before the expiration of the previous year&#39;s report.<br />For Level 2 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the acceptance requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Filing Materials and Filing Receipt</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>Issued within 10 working days after the assessment report is stamped by both parties and submitted online to the cyber police department.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Commercial Cryptography Application Rectification List</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>Within 10 working days after the completion of the gap assessment.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Commercial Cryptography Application Security Assessment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>For Level 3 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the cryptographic assessment acceptance requirements. For the annual re-assessment report: The annual re-assessment must be initiated 3 months before the expiration of the previous year&#39;s assessment report, and the annual assessment report must be issued before the expiration of the previous year&#39;s report.<br />For Level 2 systems: Within 15 working days after the acceptance assessment is conducted upon the user&#39;s completion of rectification to meet the cryptographic assessment acceptance requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:66px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:113px\"><p>Filing Materials and Filing Receipt</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:374px\"><p>Issued within 10 working days after the assessment report is stamped by both parties and submitted to the Cryptography Administration.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>b. Result Review and Acceptance</strong></p><p>After the Project Office reviews and approves the outcome report submitted by the assessment service agency, for the outcome documents that need to be submitted to the World Bank for review in accordance with regulations, the assessment service agency shall cooperate with the Project Office to complete the submission. The phased outcome shall be officially considered completed only after obtaining the World Bank&#39;s no-objection opinion. All outcome reports must fully align with the service content specified in this Terms of Reference, with standardized format, complete content, and true and accurate data.</p><p>&nbsp;</p><p><strong>V Agency and Personnel Qualification Requirements</strong></p><p><strong>a.</strong> <strong>Agency Qualification Requirements</strong></p><p>The service agency must possess the Cybersecurity Service (Level Protection Assessment) Certification Certificate issued by the Third Research Institute of the Ministry of Public Security, as well as the Commercial Cryptography Testing Agency (Commercial Cryptography Application Security Assessment) Qualification Certificate issued by the State Cryptography Administration. Within the past three years, the agency must have independently undertaken no fewer than five service projects for Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment. The relevant performance records must cover related types such as government informatization, software platform construction, system integration, and network security. These records must sufficiently demonstrate the agency&#39;s capability in compliance assessment and comprehensive security services for informatization projects.</p><p>&nbsp;</p><p>Regarding the assessment tools required for the service agency, different testing tools shall be equipped based on the testing content of this project. Examples include comprehensive management software for level protection assessment, network security inspection and early warning management software, quality monitoring management software for level protection assessment, level protection assessment management and risk assessment software, and commercial cryptography application security assessment management systems. The service agency shall provide an equipment plan for the testing tools to be used in this project within the technical proposal. (Note: For purchased assessment tools, procurement contracts and invoices must be provided; for self-developed tools, software copyrights or relevant patent certificates must be provided).</p><p><strong>b. Personnel Qualification Requirements</strong></p><p>To ensure the quality of the network security level protection assessment service and commercial cryptography application security assessment service for this project, an exclusive full-time service team must be established. The specific requirements are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:105%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:59px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:110px\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:70px\"><p>Qty.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:159px\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:185px\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:59px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:110px\"><p>Project Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:70px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:159px\"><p>Responsible for overall coordination, resource allocation, and cross-departmental communication throughout the entire project lifecycle. Control the quality of all deliverables, including the mobilization report and assessment reports. Organize project acceptance and assist in completing the filing (record-keeping) process.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:185px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 10 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:59px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:110px\"><p>Technical Director</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:70px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:159px\"><p>Take the lead in drafting the implementation plans for level protection and cryptographic assessments. Provide on-site technical supervision, analyze complex hidden risks, provide technical solutions for rectification and reinforcement, and review the objectivity and accuracy of the assessment reports.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:185px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 10 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:59px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:110px\"><p>Level Protection Assessment Task Force</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:70px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:159px\"><p>Responsible for on-site investigation, asset inventory, penetration testing, and security control assessment. Draft the &quot;Information System Rectification List&quot; and the &quot;Cybersecurity Level Protection Assessment Report,&quot; and assist in completing the filing with the cyber police department.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:185px\"><p>1. Bachelor&#39;s degree or above;<br />2. Possess competency certificates in information security, data security, network, and informatization project management;<br />3. More than 3 years of experience in Cybersecurity Level Protection Assessment and Commercial Cryptography Application Security Assessment services.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:59px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:110px\"><p>Cryptographic Assessment Task Force</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:70px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:159px\"><p>Responsible for compliance verification and risk identification of systems upgraded with national cryptography. Verify the compliance, correctness, and effectiveness of domestic cryptographic algorithm (SM2/SM3/SM4) invocations. Draft the &quot;Commercial Cryptography Application Security Assessment Report&quot; and rectification lists, and assist in completing the filing with the cryptography administration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:185px\"><p>1. Bachelor&#39;s degree or above;<br />2. Familiar with the GB/T 39786-2021 standard; practitioner in commercial cryptography application security assessment;<br />3. More than 3 years of practical experience in domestic cryptography upgrade and compliance assessment.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>VI. Facilities and Personnel Provided by the Client</strong></p><p>To ensure the smooth implementation of the service, the Client will provide the following necessary assistance and services:</p><p><strong>a.</strong> Relevant project documents, reports, annual work plans and other materials.</p><p><strong>b.</strong>Designate or entrust staff to coordinate with the service provider and carry out related work.</p>"},{"id":"OP00467697","notice_type":"Request for Expression of Interest","noticedate":"09-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-24T00:00:00Z","submission_deadline_time":"09:00","project_ctry_name":"China","project_id":"P162178","project_name":"China Food Safety Improvement Project","bid_reference_no":"GD-FSS-GAMR-CS11","bid_description":"Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project Consulting Service","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Address of EOI Submission: Huaxia Road No.49-1, Tianhe District, P/C 51000, Guangzhou, China","contact_ctry_name":"China","contact_email":"zhangzhi5@cgci.gt.cn","contact_name":"Zhang Zhi, Guo Hujun","contact_organization":"China International Tenderding Co., Ltd.","contact_phone_no":"010 8116 8424","submission_date":"2026-09-09T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>CONSULTING SERVICE for China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project </strong></p><p><strong>Country: </strong>People&#39;s Republic of China</p><p><strong>Name of Project: </strong>China Food Safety Improvement Project</p><p><strong>Loan No.: </strong>IBRD-92130</p><p><strong>Assignment Title: </strong>Consulting Service</p><p><strong>Reference No.: &nbsp;</strong>GD-FSS-GAMR-CS11</p><p>The Guangdong Administration for Market Regulation has received financing from the World Bank toward the cost of the China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project, and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include:</p><p><strong>1. Scope of Services:</strong></p><p>Provide comprehensive professional consulting services throughout the implementation period of this project, to facilitate the smooth execution of each construction sub-project.</p><p><strong>2. Estimated Amount: </strong>CNY 1.4147 million</p><p><strong>3. Scope of Services:</strong></p><p>The services aim to provide comprehensive consulting and on-site management support covering the entire process for the World Bank Project Office of the Guangdong Provincial Administration for Market Regulation. The scope of work encompasses core tasks including project management, procurement and contract management, monitoring and evaluation (M&amp;E), IT consulting, and translation. Specifically, the services include:</p><p>Assisting the Project Office with the interpretation of World Bank policies, document preparation, daily liaison, and the drafting of various plans and reports;</p><p>Guiding procurement and bidding processes, overseeing bid evaluations, and managing contract performance;</p><p>Conducting regular surveys on project indicator data and preparing monitoring and evaluation reports;</p><p>Providing technical proposal reviews and acceptance guidance for the development of IT platforms such as food traceability systems and &quot;transparent kitchens&quot;;</p><p>Handling on-site affairs including daily coordination and communication with the World Bank and relevant competent authorities, report translation, document archiving, and meeting organization, to fully ensure the compliant and efficient advancement of the project.</p><p><strong>4. Service Duration:</strong></p><p>The term of consulting services for this project shall commence on the date of contract signing and expire on the project closing date (March 31, 2029).</p><p><strong>5. Deliverables:</strong></p><p>The consulting services shall be delivered in an orderly manner in accordance with the contract and World Bank requirements. The deliverables will cover the entire project cycle, including inception reports, annual plans, quarterly/semi-annual progress reports, procurement technical documents, mid-term adjustment reports, management tools, completion reports, and summary reports. Each deliverable corresponds to a specific milestone (e.g., inception report within 1 month after contract signing, quarterly reports within 1 month after the end of the quarter, and completion reports prior to the project closing date), forming a complete delivery chain from preliminary planning to final summary.</p><p>During the review and acceptance phase, all deliverables must first be audited by the Project Office. If submission to the World Bank is required, the deliverables must obtain a &quot;No Objection&quot; from the World Bank before formal completion. Furthermore, all deliverables must strictly align with the scope of services outlined in the Terms of Reference (TOR), ensuring standardized formatting, comprehensive content, and authentic, accurate data. This is to guarantee that the outputs at each stage not only meet procedural compliance requirements but also possess substantial reference and practical value.</p><p><strong>6. Qualifications</strong></p><p>The consulting firm shall primarily assign the following key personnel: Project Management Expert, Procurement, Contract Management and Monitoring &amp; Evaluation Expert, IT Management Consulting Expert, and On-site Engineer. The qualifications and responsibilities for each key position are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:99%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:8%\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:17%\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:8%\"><p>Qty.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:36%\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:29%\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>Project Management Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:36%\"><p>To coordinate all consulting and translation services, manage team allocation, and oversee service progress and quality for the Project Office. Responsible for compiling and reviewing various deliverables, coordinating the resolution of project issues, and facilitating World Bank reviews.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Over 15 years of project management experience, including at least 5 years of experience in managing loan/grant projects;<br />2. Excellent report writing and overall project management capabilities;<br />3. Ability to compile reports in both Chinese and English.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>Procurement, Contract Management, and M&amp;E Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:36%\"><p>Responsible for procurement execution, contract management, and monitoring &amp; evaluation (M&amp;E) for projects financed by International Financial Organizations (IFOs).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Over 5 years of procurement experience in projects financed by IFIs/IFOs;<br />2. Familiarity with World Bank procurement policies and requirements;<br />3. Familiarity with World Bank contract management and M&amp;E requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>IT Management Consulting Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:36%\"><p>Responsible for consulting on the development and design of IT platforms.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>At least 10 years of experience in IT platform development and design.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>On-site Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:36%\"><p>Stationed at the Project Office to handle daily liaison and coordination with the World Bank and competent authorities; assist in drafting work plans and various progress reports. Support the drafting of the Terms of Reference (TOR), bid reviews, IT acceptance, and M&amp;E data collection. Undertake on-site support tasks including document archiving, daily translation, and meeting organization to ensure the compliant advancement of the entire project process.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Bachelor&rsquo;s degree or above;<br />2. Background in IT-related majors with project management work experience.</p></td></tr></tbody></table><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>The Guangdong Administration for Market Regulation now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: the overall competence and strength of the Consultant, quality control and project management capabilities, understanding of the assignment, relevant experience and past performance, proposed team composition, preliminary work plan, and a brief technical approach. Key Experts will not be evaluated at the shortlisting stage.</p><p><strong>Contents of this Request for Expressions of Interest:</strong></p><ol><li>Expression of interest in undertaking the consulting services for this project;</li><li>Company profile and core competencies/advantages;</li><li>List of past project performance;</li><li>Key points of the preliminary technical approach and work plan;</li><li>Preliminary staffing plan;</li><li>Proposed core team (including resume summaries of the Team Leader and key experts).</li></ol><p><strong>Required Submission Documents:</strong></p><p>1. Letter of Expression of Interest (or Letter of Response) submitted by the consulting firm;</p><p>2. Company profile;</p><p>3. Summary of past project performance (specifying the project name, client, scope of services, and service duration);</p><p>4. Simplified technical approach (briefly outlining key points; a detailed proposal is not required at this stage);</p><p>5. Preliminary work plan;</p><p>6. Key team experts (personnel profiles must be provided);</p><p>7. Any other documents the consulting firm deems necessary to provide.</p><p>Note: All the above-mentioned documents must be stamped with the official seal of the consulting firm.</p><p>Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Borrower. Without limitation on the generality of the foregoing, Consultants shall not be hired under the circumstances set forth below:</p><p><em>a. a firm that has been engaged by the Borrower to provide Goods, Works, or Non-Consulting Services for a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), shall be disqualified from providing Consulting Services resulting from, or directly related to, those Goods, Works, or Non-Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract; a firm that has been engaged by the Borrower to provide Consulting Services for the preparation or implementation of a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that Consulting firm), shall be disqualified from subsequently providing Goods, Works, or Non-Consulting Services resulting from, or directly related to those Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract;</em></p><p><em>b. neither a Consultant (including personnel and sub-consultants), nor an affiliate (that directly or indirectly controls, is controlled by, or is under common control with that Consultant), shall be hired for any assignment that, by its nature, creates a conflict of interest with another assignment of the Consultant;</em></p><p><em>c. Consultants (including their experts and other personnel, and sub-consultants), that have a close business or family relationship with a professional staff of the Borrower, or of the project implementing agency, or of a recipient of a part of the Bank&rsquo;s financing, or any other party representing or acting on behalf of the Borrower, that is directly or indirectly involved in any part of: i. the preparation of the ToR for the assignment; ii. the selection process for the contract; or iii. the supervision of the contract; may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.</em></p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the CQS method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below <strong>during office hours&nbsp;from 09:00 to 17:00 on working days from September 9 to September 23, 2026</strong></p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by 09:00 on September 24, 2026.</p><p>&nbsp;</p><p><strong>Tender Agency: </strong>China International Tendering Co., Ltd.</p><p><strong>Attn: </strong>Zhang Zhi, Guo Hujun</p><p><strong>Title: </strong>Project Manager</p><p><strong>Address:</strong> Huaxia Road No. 49-1, Tianhe District, Guangzhou, Guangdong, China</p><p><strong>Postal Code:</strong> 51000</p><p><strong>Tel.: </strong>+86 10-81168424; +86 10-81168460</p><p><strong>E-mail: </strong>zhangzhi5@cgci.gt.cn; guohujun@gt.cn</p><p>&nbsp;</p><p><strong>Employer: </strong>Guangdong Administration for Market Regulation</p><p><strong>Attn: </strong>Chen Lin</p><p><strong>Title: </strong>Special Cadre, World Bank Loan Project Office</p><p><strong>Address: </strong>No. 363 West Huangpu Avenue, Tianhe District, Guangzhou, Guangdong Province, China</p><p><strong>Tel.: </strong>020-38835493</p><p>&nbsp;</p><p>Annex: detailed Terms of Reference (TOR)</p><p><strong>TERMS OF REFERENCE</strong></p><p>To ensure the smooth implementation of consulting services for the China Food Safety Improvement Project Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project , and to guarantee the achievement of the project&#39;s informatization goals, the Guangdong Administration for Market Regulation intends to engage a third-party service provider to carry out the project implementation.</p><p><strong>I. Project Background and Description</strong></p><p>The World Bank-funded China Food Safety Improvement Project aims to enhance national and local food safety management and reduce food safety risks along selected value chains. At the national level, the project will be jointly implemented by the State Administration for Market Regulation (SAMR) and the Ministry of Agriculture and Rural Affairs (MARA). At the local level, it will be carried out by the Department of Agriculture and Rural Affairs of Guangdong Province, the Guangdong Administration for Market Regulation, and the Bureau of Ocean Development and Fisheries of Yantai City, Shandong Province. The loan agreement for the project entered into force on March 21, 2024. The project has an implementation period of five years, with a closing date of March 31, 2029.</p><p>The Guangdong Administration for Market Regulation takes the comprehensive enhancement of modern food safety governance capacity as its core objective in this project. By systematically constructing and collaboratively advancing six sub-projects, it precisely supports and effectively drives the achievement of the project goals. The Guangdong Provincial Administration for Market Regulation plans to apply for a World Bank loan of USD 10 million for this project. The main construction contents of the project include:</p><p>1. Building a full-chain traceability platform (&quot;Scan-to-Trace&quot;) for key food categories, achieving full-chain traceability and risk early warning through 15 functional modules and 359 functional points;</p><p>2. Building the &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; system, providing intelligent video supervision for scenarios such as elderly care canteens and school cafeterias;</p><p>3. Upgrading the emergency real-time dispatch and command system to improve the emergency response mechanisms for food safety incidents;</p><p>4. Implementing a capacity building program for food-related personnel in the field of market regulation, including the development of a learning and assessment system, the production of video content for 75 courses, and skills competitions;</p><p>5. Establishing a high-quality food standards system and promotional campaigns, developing no fewer than 30 standards within two years and conducting quality monitoring;</p><p>6. Providing professional consulting services throughout the entire project implementation process.</p><p><strong>II. Project Objectives</strong></p><p>To meet the demand for professional consulting services throughout the entire implementation process of the World Bank-funded Guangdong Agricultural Product Quality and Safety Improvement (Demonstration) Project, strengthen project process management, facilitate the smooth progress of various tasks, and promote the efficient implementation of the World Bank project, the Guangdong Administration for Market Regulation plans to engage a professional project management consulting agency. The agency will provide consulting services in project management, procurement management, contract management, monitoring and evaluation, and informatization management, as well as daily English translation services and the issuance of corresponding outcome reports.</p><p>This project takes the comprehensive enhancement of modern food safety governance capacity as its core objective. By systematically constructing and collaboratively advancing six sub-projects, it precisely supports and effectively drives the achievement of various core performance indicators:</p><p>At the outcome indicator level, relying on the deep integration and linkage of the &quot;Scan-to-Trace&quot; full-chain traceability platform, the &quot;Internet Plus Open Kitchens&quot; intelligent supervision system, and the emergency real-time dispatch and command system, a full-chain management mechanism covering risk identification, early warning response, and disposal closure will be established. This will provide a solid data foundation and institutional guarantee for scientifically calculating the &quot;proportion of warnings with mitigation measures initiated.&quot;</p><p>At the output indicator level, through the capacity building program for food-related personnel, systematic training will be provided to food safety inspectors and regulatory personnel, and the proportion of female regulatory personnel participating will be quantified. Through the high-quality food standards system construction project, no fewer than 30 standards will be developed, 6 demonstration model enterprises will be built, and 700 batches of quality monitoring will be completed. These will directly support the realization of key output indicators such as the &quot;number of enterprises receiving project support to improve food safety management.&quot;</p><p>Through the project consulting services, the technical feasibility, economic rationality, and environmental and social sustainability of the project will be ensured, and the project design and implementation capabilities will be enhanced. Meanwhile, the consultants will assist in identifying potential risk factors of the project, propose corresponding mitigation measures, and strengthen project risk management capabilities. Furthermore, it will ensure that the collection, accounting, and reporting of all indicator data comply with World Bank specifications, thereby enhancing the international compliance and transparency of the project, facilitating the smooth progress of various tasks, and promoting the efficient implementation of the World Bank project.</p><p><strong>III. Service Overview</strong></p><p>The total investment amount for this project is RMB 1.4147 million.</p><p>(I) Scope of Services</p><p>During the implementation period of this project, the service provider shall provide comprehensive professional consulting services to the project implementation unit and assist in the smooth progress of various construction projects.</p><p>(II) Service Content</p><p>1. Project Management Consulting</p><p>Assist the Project Management Office (PMO) in collecting and organizing World Bank-related policies and materials: Collect and organize World Bank policy documents related to project management, provide policy interpretations, and ensure that the project implementation team has a clear understanding of the policies to offer policy consulting for project execution. Assist the PMO in establishing operational procedures and detailed management system rules for this project, ensuring compliance with World Bank and national requirements, and determining management workflows. Assist the PMO in organizing preliminary historical data related to this project to provide necessary references for subsequent implementation. Be responsible for daily liaison work, including communication with the World Bank team, the Provincial Development and Reform Commission, the Provincial Department of Finance, and other relevant departments, as well as various project construction service agencies.</p><p>Meanwhile, based on project management needs, be responsible for drafting annual work plans, quarterly, semi-annual, and annual project progress reports, annual comprehensive evaluation reports, daily liaison work, mid-term evaluation and adjustment reports, and training work plans.</p><p>2. Procurement Management Consulting</p><p>Assist the Project Management Office (PMO) in preparing procurement plans, drafting Terms of Reference (TOR), reviewing bidding documents, supervising bid evaluations, and managing contract negotiations and performance. This is to ensure that procurement activities adhere to the principles of economy, efficiency, transparency, and fair competition, thereby reducing compliance risks and guaranteeing the compliant use of project funds and smooth project implementation.</p><p>3. Contract Management Consulting</p><p>Assist the PMO in formulating an overall procurement plan aligned with the project construction content based on project activities, and make timely adjustments according to project progress and requirements from all parties. As requested by the PMO, assist in drafting the TOR for consulting service activities required for this project, revise and improve them according to the World Bank&#39;s feedback, and obtain the Bank&#39;s &quot;no objection.&quot; Assist the procurement agency in handling various matters during the bidding process and reviewing project procurement bidding documents, and assist the PMO in responding to and implementing the World Bank&#39;s feedback on the review of bidding documents (technical aspects). After the project activities have completed the procurement procedures required by the World Bank, and during the implementation of sub-project contracts, assist the PMO in strengthening contract management and acceptance work.</p><p>4. Project Monitoring and Evaluation</p><p>In accordance with the project results framework indicators specified in the project assessment documents, regularly conduct surveys on project monitoring indicator data, draft annual monitoring and evaluation reports, and assist the PMO in explaining issues related to the survey methodology and data reliability of the monitoring and evaluation data to the World Bank.</p><p>5. Informatization Management Consulting</p><p>Provide consulting services and technical guidance for the construction of informatization platforms in this project, including the &quot;Scan-to-Trace&quot; full-chain traceability platform for food, the &quot;Yue-Shi-An Internet Plus Open Kitchens&quot; system, and the emergency real-time dispatch and command system. Services include assisting in the preparation and review of technical proposals, helping to resolve technical issues encountered during the procurement of information platforms, supervising the platform supervision work, assisting in the acceptance of informatization platforms, and providing professional technical guidance regarding the design, implementation, operation, and promotion of these platforms.</p><p>6. Translation Services</p><p>Based on project management needs, the service provider shall handle the translation of emails exchanged with the World Bank, World Bank memos, and various reports submitted to the World Bank. The original formats, such as PDF, Word, and Excel, must be preserved. Terminology must comply with industry or World Bank standards. The translation shall meet localization and proofreading requirements, adapt to the World Bank&#39;s official terminology database, and undergo multiple rounds of review to ensure compliance with World Bank document specifications.</p><p>7. On-site Services</p><p>The service provider shall participate in the daily management of the World Bank project throughout the entire process. The main responsibilities include daily liaison and coordination with the World Bank and relevant competent authorities; assisting in drafting work plans, procurement plans, and various progress reports; cooperating in completing the drafting of Terms of Reference (TOR), bid reviews, informatization platform acceptance, and monitoring and evaluation data collection; and undertaking tasks such as file archiving, daily translation, and meeting organization. The on-site support will be provided to ensure the compliant advancement of the entire project process.</p><p>(III) Service Period</p><p>The consulting service period for this project shall commence from the date of contract signing and continue until the project closing date (March 31, 2029).</p><p><strong>IV. Deliverables, Deliverable Review, and Acceptance</strong></p><p>(I) Deliverables</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:47px\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:267px\"><p>Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:255px\"><p>Submission Date</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Consulting Service Inception Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>Within 1 month after contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Annual Project Work Plan, Procurement Plan, Fund Utilization Plan, and Capacity Building Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>By December 31 each year, as required by the World Bank</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Project Quarterly Progress Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>Within 1 month after the end of each quarter</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Project Semi-annual Progress Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>By March 1 and September 1 each year, as required by the World Bank</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Terms of Reference (TOR) and Technical Requirement Documents for Procurement Activities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>As specified by the Project Management Office (PMO)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Mid-term Adjustment Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>As required by the World Bank</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Official Version of Project Management Tools</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>Within 3 months after mobilization</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Project Completion Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>Before the project closing date</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:47px\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:267px\"><p>Consulting Service Summary Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:255px\"><p>Within 2 months prior to contract completion</p></td></tr></tbody></table><p>(II) Deliverable Review and Acceptance</p><p>Upon receiving the deliverable reports submitted by the consulting service provider, the Project Management Office (PMO) shall review them. For deliverable documents that are required to be submitted to the World Bank for review according to regulations, the consulting service provider shall assist the PMO in completing the submission. The phased deliverables shall be officially considered closed only after obtaining the World Bank&#39;s &quot;no objection.&quot;</p><p>All deliverable reports must fully align with the service content specified in this Terms of Reference (TOR). They must be standardized in format, comprehensive in content, and authentic and accurate in data.</p><p><strong>V. Qualification Requirements for the Agency and Personnel</strong></p><p>(I) Agency Qualification Requirements</p><p>The service provider must have independently undertaken project management consulting services for no fewer than two projects funded by loans or grants from international financial organizations within the past five years. The relevant performance records must fall within the scope of similar project management consulting, and sufficiently demonstrate the agency&#39;s comprehensive service capability in full-process compliance control and coordination for international financial organization projects. Priority will be given to candidates with experience in implementing similar projects within Guangdong Province.</p><p>(II) Personnel Qualification Requirements</p><p>The consulting service provider shall primarily deploy key personnel, including a Project Management Expert, Procurement, Contract Management, and Monitoring &amp; Evaluation Experts, an Informatization Management Expert, and On-site Engineers. The qualification requirements and functional responsibilities for each key position are as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:99%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:8%\"><p>No.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:17%\"><p>Expert Position</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:10%\"><p>Qty.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:33%\"><p>Responsibilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:29%\"><p>Qualifications</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>Project Management Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:10%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33%\"><p>To coordinate all consulting and translation services, manage team allocation, and oversee service progress and quality for the Project Office. Responsible for compiling and reviewing various deliverables, coordinating the resolution of project issues, and facilitating World Bank reviews.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Over 15 years of project management experience, including at least 5 years of experience in managing loan/grant projects;<br />2. Excellent report writing and overall project management capabilities;<br />3. Ability to compile reports in both Chinese and English.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>Procurement, Contract Management, and M&amp;E Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:10%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33%\"><p>Responsible for procurement execution, contract management, and monitoring &amp; evaluation (M&amp;E) for projects financed by International Financial Organizations (IFOs).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Over 5 years of procurement experience in projects financed by IFIs/IFOs;<br />2. Familiarity with World Bank procurement policies and requirements;<br />3. Familiarity with World Bank contract management and M&amp;E requirements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>IT Management Consulting Expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:10%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33%\"><p>Responsible for consulting on the development and design of IT platforms.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>At least 10 years of experience in IT platform development and design.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:8%\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:17%\"><p>On-site Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:10%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33%\"><p>Stationed at the Project Office to handle daily liaison and coordination with the World Bank and competent authorities; assist in drafting work plans and various progress reports. Support the drafting of the Terms of Reference (TOR), bid reviews, IT acceptance, and M&amp;E data collection. Undertake on-site support tasks including document archiving, daily translation, and meeting organization to ensure the compliant advancement of the entire project process.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>1. Bachelor&rsquo;s degree or above;<br />2. Background in IT-related majors with project management work experience.</p></td></tr></tbody></table><p><strong>VI. Facilities and Personnel Provided by the Client</strong></p><p>To facilitate the smooth implementation of these services, the Client will provide the following necessary assistance and services:</p><p>(I) Relevant project documents, reports, annual work plans, and other related materials.</p><p>(II) Designate or assign staff to liaise with the service provider to carry out related work.</p>"},{"id":"OP00467036","notice_type":"Request for Expression of Interest","noticedate":"04-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-30T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Ukraine","project_id":"P504171","project_name":"Lifting Education Access and Resilience in times of Need in Ukraine Program","bid_reference_no":"LEARN-1.1-CIRRICULA","bid_description":"Consultancy Services for Development of Model Programs for Professionally Oriented Specialised Secondary Education","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"10 Beresteiskyi Avenue, Kyiv, 01135, Ukraine","contact_ctry_name":"Ukraine","contact_email":"kateryna.kovtun@mon.gov.ua","contact_name":"Kateryna Kovtun","contact_organization":"Ministry of Education and Science of Ukraine","contact_phone_no":"+380 44 481 32 21","contact_web_url":"https://mon.gov.ua/","submission_date":"2026-09-04T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p><strong>UKRAINE</strong></p><p>Country: Ukraine</p><p>Program: &laquo;Lifting Education Access and Resilience in times of Need in Ukraine Program&raquo;</p><p>Grant : TF0C5794</p><p>Project : P504171</p><p>Assignment Title: Consultancy Services for Development of Model Programs for Professionally Oriented Specialised Secondary Education</p><p>Contract Package ID: LEARN-1.1-CIRRICULA</p><p>Ukraine has received financing from the World Bank toward the cost of the Lifting Education Access and Resilience in Times of Need in Ukraine Program.</p><p>The Ministry of Education and Science intends to use part of the proceeds for consulting services, for which this REoI has been issued.</p><p>Consulting services (hereinafter referred to as &quot;Services&quot;) include: supporting MoES in developing a comprehensive, scalable and standardised set of professionally oriented model programs for upper secondary education.</p><p>The expected period for the Consultant to provide services for the development of the online course is approximately 6 calendar months, starting in December 2026.</p><p>Detailed information regarding the provision of the specified Services is provided in the Terms of Reference (hereinafter referred to as &quot;TOR&quot;), which is attached.</p><p>The Ministry of Education and Science of Ukraine (hereinafter referred to as the &quot;Client&quot;) invites qualified consulting companies (hereinafter referred to as &quot;Consultants&quot;) to express their interest in providing the specified Services. Interested Consultants must provide information that confirms their qualifications and experience required to perform the Services.</p><p>The evaluation of the expressions of interest provided by the Consultants will be carried out based on the following criteria:</p><p><strong>Minimum Qualification Requirements (Pass/Fail Basis)</strong></p><p>Failure to meet any of the requirements below shall result in disqualification.</p><p><em>Core Business and Experience</em></p><ul><li>At least 3 (three) years of experience in education, curriculum development, institutional development, or related fields;</li><li>At least 3 (three) successfully completed assignments during the last 6 years in one or more of the following areas:</li></ul><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; curriculum development or educational program design;</p><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; vocational education or education sector projects;</p><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; capacity building programs for education institutions.</p><p>In case of a Joint Venture / Consortium (JVCA), the Lead Member shall demonstrate substantial compliance with the above requirements, including at least 3 (three) years of relevant experience and participation in at least 2 (two) relevant assignments. The JVCA as a whole must meet all qualification requirements.</p><p><em>Financial Capacity</em></p><ul><li>Average annual turnover for the last 3 completed financial years shall be at least USD 150,000 or equivalent.</li></ul><p>&nbsp;In case of a JVCA: Lead Member: minimum 50% of the annual turnover requirement; Other members: minimum 25% of the annual turnover requirement; Combined: must fully meet the annual turnover requirement. Audited financial statements or verified financial documents shall be provided.</p><p><em>Experience with Donor-Funded Projects</em></p><ul><li>At least one assignment financed by international financial institutions or bilateral donors (e.g., World Bank, EBRD, EU, GIZ, UNICEF, etc.) within the last 5 years is an advantage.</li></ul><p><em>Staff</em></p><p>The Consultant shall provide suitably qualified professionals in terms of expertise and time allocation to complete the activities required under the scope of work and to finally achieve the objectives of the Assignment in terms of time, costs and quality, within the agreed timeframe.</p><p>The Consultant shall also provide adequate administrative staff (secretaries, translators, etc.) needed to support the expert team.</p><p>The attention of interested Consultants is drawn to Section III, items 3.14, 3.16, and 3.17 of The <u>World Bank Procurement Regulations for IPF Borrowers</u>[1], dated September 2023 with amendments of September 2025[2] (hereinafter referred to as the &quot;Procurement Regulations&quot;), which contains the World Bank&#39;s policy regarding conflict of interest.</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>Selection of a Consultant will be performed in accordance with Consultant&rsquo;s Qualification-based Selection (CQS) method following World Bank&rsquo;s Consultants Guidelines.</p><p>Further information may be obtained at the address below.</p><p>Expressions of interest must be submitted in Ukrainian or English via email to the address: kateryna.kovtun@mon.gov.ua Cc: serhiy.artemenko@uiherp.org; uiherp@mon.gov.ua <strong>by 2:00 PM Kyiv time on September 30, 202</strong><strong>6</strong>.[3]</p><p>Expressions of interest to be clearly marked: <strong>&quot;LEARN-1.1-CIRRICULA: Expression of Interest&quot;</strong>.</p><p><em>Consultants should provide not only information demonstrating their compliance with the <strong>Mandatory Minimum Qualification Requirements</strong>, but also information that meets the specific requirements of the assignment and will be considered an advantage. The Consultant rating will be based on compliance with these latter requirements. The Consultant with the highest rating, determined according to the established criteria for evaluating the Consultant&rsquo;s qualifications, will be invited to submit a technical and financial proposal.</em></p><p><em>Information on the Consultant&rsquo;s experience provided by the Consultants must be <strong>documented</strong> (copies of contracts or parts thereof, and acceptance certificates for services provided; additionally, client references may be submitted, describing the specifics of the completed assignment).</em></p><p><em>Interested Consultants are additionally advised to pay attention to the following aspects when preparing their information:</em></p><ul><li><em>Files submitted by the Consultant should be in <strong>PDF (Portable Document Format) and/or JPG formats</strong> and should be as consolidated as possible;</em></li><li><em>When preparing information describing your qualifications and experience, provide as much detail as possible to demonstrate compliance with the established qualification criteria and relevance to the assignment;</em></li><li><em>Include copies of documents confirming the stated experience and competencies, and provide contact information of third parties who can confirm your experience and provide relevant references.</em></li></ul><p><em>Consultants who have submitted an EOI <strong>should not submit any documents or information after the deadline for EOI submission</strong>, except for providing documents and/or information requested by the Employer for clarification or explanation of the submitted EOI. Any exchange of information between the Employer and Consultants must be in <strong>writing via the official email addresses specified in this announcement</strong>.</em></p><p><strong><em>LIST OF ATTACHED DOCUMENTS</em></strong></p><ol><li><em>Terms of Reference (TOR)</em></li></ol><p>&nbsp;</p><p>[1] https://thedocs.worldbank.org/en/doc/6c0602876d68949e80820507d90a14ed-0290012023/original/Procurement-Regulations-September-2023.pdf</p><p>[2] https://thedocs.worldbank.org/en/doc/20fb60f35ce8f2b52bb205da13c4df79-0290012023/original/Revisions-of-the-Procurement-Regulations-September-2023.pdf</p><p>[3] Consultants are advised to ensure that their submission has been delivered to the recipient</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Consultancy Services for Development of Model Programs </strong></p><p><strong>for Professionally Oriented Specialised Secondary Education</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>Contract <strong>LEARN-1.1-CIRRICULA</strong></p><p><strong>ACRONYMS</strong></p><p>&nbsp;</p><p><strong>EC(s)</strong> &ndash; Educational Component(s)</p><p><strong>ED(s) </strong>- Educational Domain(s)</p><p><strong>MEC(s)</strong> - Mandatory Educational</p><p>Component(s)</p><p><strong>MoES</strong> &ndash; Ministry of Education and Science of Ukraine</p><p><strong>MP(s)</strong> &ndash; Model Program(s) of Mandatory Educational Component belonging</p><p>to some&nbsp; Educational Domain and included to the Group 1 according to the</p><p>Order 898</p><p><strong>Order 657 </strong>- Order of the Ministry of Education and Science of Ukraine No.</p><p>675 dated 05.06.2023&nbsp; &quot;On Approval of the Procedure for Conducting</p><p>Expertise, Providing Grades to Educational Literature and Curriculums&quot;</p><p><strong>Order 898</strong> - Order of the Ministry</p><p>of Education and Science of Ukraine No. 898 dated June 8, 2026 &ldquo;On Approval of</p><p>the Typical Educational Program for Professionally Oriented Specialised</p><p>Secondary Education&rdquo;.</p><p><strong>PO</strong> - Professional Orientation</p><p><strong>POSSE</strong> - Professionally Oriented Specialised Secondary Education</p><p><strong>PPHE</strong> &ndash; Professional Pre-Higher Education</p><p><strong>QA</strong> &ndash; Quality Assurance</p><p><strong>SSE</strong> &ndash; Specialised Secondary Education</p><p><strong>SSSE</strong> - State Standard of Specialised Secondary Education</p><p><strong>TPSSE</strong> - Typical educational program of specialised secondary education</p><p><strong>VE</strong> &ndash; Vocational Education</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>I. BACKGROUND</p><p>Ukraine with the International Bank for Reconstruction and Development and the International Development Association (hereinafter referred to as the World Bank) have signed the agreements for the Program &ldquo;Lifting Education Access and Resilience in times of Need in Ukraine&rdquo; (hereinafter referred to as the LEARN or Operation).</p><p>LEARN was designed to address critical issues and provide the necessary support to the education sector in accordance with the Strategic Action Plan of the Ministry of Education and Science of Ukraine until 2027, approved by the Order of the Ministry of Education and Science of Ukraine dated 07.03.2024 No. 276 (hereinafter referred to as the Strategic Plan).</p><p>The Operation focuses on supporting the priorities &ldquo;1. Early Childhood and Preschool Education&rdquo; and &ldquo;2. Reform of the &ldquo;New Ukrainian School&rdquo;&rdquo; stipulated in the Strategic Plan.</p><p>The LEARN objectives are: (i) to improve teaching and learning conditions; and (ii) to strengthen the management capacity of the education system. The total LEARN financing amounts to US$451 million provides a combination of the World Bank financing instruments: Program for Results (PforR) and Investment Project Financing (IPF).</p><p>The Program-for-Results (PforR) is implemented through a US$235 million loan provided by Bank resources, supported by loan enhancement from the Advancing Needed Credit Enhancement for Ukraine (ADVANCE Ukraine) Trust Fund, which is backed by the Government of Japan. This is formalized under the Loan Agreement between Ukraine and the International Bank for Reconstruction and Development for the Program (LOAN No 9721-UA). An additional US$150 million is provided under the Special Program for Ukraine and Moldova Recovery (SPUR) of the International Development Association (IDA) Crisis Facility, as outlined in the Financing Agreement between Ukraine and the International Development Association for the Program (CREDIT No 7626-UA). On July 1, 2025, the Financing Agreement (Additional Financing: Lifting Education Access and Resilience in Times of Need in Ukraine Program) between Ukraine and the International Development Association (CREDIT No 7905-UA) was signed in the amount of US$4.9 million.</p><p>Furthermore, US$30 million in Investment Project Financing (IPF) is secured under the Grant Agreement between Ukraine and the International Bank for Reconstruction and Development and the International Development Association, acting as the administrator of the Ukraine Relief, Recovery, Reconstruction, and Reform Multi-Donor Trust Fund (URTF GRANT No TF0C5794). On December 19, 2025, the Grant Agreement (Additional Financing for Lifting Education Access and Resilience in Times of Need in Ukraine Project) between UKRAINE and the International Bank for Reconstruction and Development and the International Development Association jointly acting as a Supervising Entity for the Global Partnership for Education Fund and as administrator of the Ukraine Relief, Recovery, Reconstruction and Reform Multi-Donor Trust Fund (GPE GRANT No TF0D0613, URTF GRANT No TF0D0612) was signed in the amount of US$31.1 million.</p><p>More detailed information about the LEARN program is provided at &nbsp;https://projects.worldbank.org/en/projects-operations/project-detail/P504171</p><p>The latest additional grant agreement provides for expanded support for reforms in the education sector, in particular by:</p><p>&bull; financing activities for the development of preschool education;</p><p>&bull; providing grant support of the Global Partnership for Education (GPE) aimed at strengthening the institutional capacity of the Ministry of Education and Science of Ukraine to implement educational reforms.</p><p>In accordance with the provisions of the agreements concluded, the Ministry of Education and Science of Ukraine is responsible for the overall implementation, coordination, monitoring and reporting on the Project activities, in particular those aimed at strengthening the institutional management capacity of the Ministry of Education and Science of Ukraine. Such activities include the provision of technical assistance, the development and implementation of information systems, conducting training activities in the field of vocational (technical) education, as well as the implementation of initiatives in cross-sectoral areas, in particular inclusive education, European integration, education infrastructure management and strategic planning.</p><p>The Ministry of Education and Science of Ukraine (MoES) is implementing comprehensive reforms aimed at aligning the education system with labour market needs, supporting economic recovery, and advancing Ukraine&rsquo;s European integration agenda.</p><p>A key component of this reform is the introduction of <strong>professionally oriented upper secondary education</strong>, which integrates general education with early professional orientation and creates structured pathways between general secondary education, vocational education, and professional pre-higher education.</p><p>The regulatory and methodological framework required for this transformation has already been established, including:</p><ul><li>adoption of the Law of Ukraine &ldquo;On professional (vocational) education&rdquo; (August 2025);</li><li>development of secondary legislation and regulatory acts;</li><li>approval of competency-based professional education standards;</li><li>entry into force of the State Standard of Specialised Secondary Education (Resolution of the Cabinet of Ministers of Ukraine dated July 25, 2024 No. 851);</li><li>Typical educational program of specialised secondary education in a professional orientation (Order of the Ministry of Education and Science of Ukraine dated 08.06.2026 no. 898);</li><li>Procedure for Conducting Expertise, Providing Grades to Educational Literature and Curriculums (Order of the Ministry of Education and Science of Ukraine No. 675 dated 05.06.2023</li></ul><p>&nbsp;</p><p>Initial experience in developing model programs has demonstrated strong demand, high institutional interest, and significant scalability potential. At the same time, the system currently lacks a sufficient number of professionally oriented model programs<strong> </strong>across priority economic sectors, as well as adapted academic content aligned with professional pathways.</p><p>Given that the regulatory framework has only recently been finalised, this Assignment represents the first opportunity to implement curriculum transformation at scale within a fully operational legal and methodological environment.</p><p>Under the GPE-financed institutional capacity activities, MoES intends to engage a qualified Consultant to develop a comprehensive, scalable and standardised set of professionally oriented model programs for upper secondary education. The Assignment shall be implemented over a period of six (6) months from the Effective Date of the Contract. The Assignment will enable rapid, scalable transformation of curriculum content, directly impacting over 37,000 learners in priority economic sectors and creating a foundation for nationwide implementation of professionally oriented upper secondary education.</p><p>&nbsp;</p><p>The Assignment is expected to be implemented in line with World Bank Procurement Regulations for IPF Borrowers and applicable Ukrainian legislation.</p><p>&nbsp;</p><p>II. OBJECTIVE</p><p>The objective of the Assignment is to support MoES in developing a comprehensive, scalable and standardised set of professionally oriented model programs for upper secondary education.</p><p>Specifically, the Assignment is to develop forty-one (41) model programs of mandatory educational components by educational domains for four (4) specializations of professionally oriented specialised secondary education, namely, Construction, Engineering and Technology, Information Technology, and Medical specialization (aligned with priority economic sectors) under the State standard of profile secondary education.</p><p>The model programs should be aligned with professional standards, labour market needs and sectoral requirements, as well as provide a unified national approach to curriculum development and adaptation.</p><p>The Consultant shall achieve the above objective in full compliance with applicable regulatory and legal framework of Ukraine, including relevant regulations of the Ministry of Education and Science of Ukraine, and procurement and implementation requirements of the World Bank.</p><p>III. SCOPE OF SERVICES</p><p>3.1 Overall Approach</p><p>The Consultant shall provide comprehensive technical, methodological and organisational support to MoES for the development of professionally oriented model programs for upper secondary education.</p><p>The Assignment shall build upon the existing regulatory framework developed by MoES.</p><p>The implementation logic shall follow a structured sequence:</p><ol><li>Mobilisation of the expert pool.</li><li>Development of specialised model programs.</li><li>Quality assurance and validation.</li></ol><p>All activities shall ensure consistency, scalability, and alignment across programs.</p><p>3.2 Components</p><p>Component 1. Expert Mobilisation and Coordination</p><p>The Consultant shall mobilise and manage a structured expert pool and ensure effective coordination throughout all stages of the Assignment.</p><p>The Consultant shall:</p><ul><li>mobilise and manage a structured expert pool including:<ul><li>VE and PPHE educators;</li><li>scientific and research-pedagogical staff (academics involved in relevant fields of study);&nbsp;</li><li>sectoral experts from industry;</li><li>methodological specialists from NMCs;</li></ul></li><li>ensure balanced representation across sectors;</li><li>establish coordination mechanisms and workflows;</li><li>assign clear roles and responsibilities;</li><li>develop Quality Assurance Plan;</li><li>ensure timely delivery of outputs.</li></ul><p>It is recommended that each Model Program draft be developed by a compact drafting team comprising at least two (2) Subject Experts (Non-Key Experts) responsible for its development.</p><p>Each Sectoral Expert shall coordinate all drafts of Model Programs&nbsp; within the assigned specialization and responsible for:</p><ul><li>methodological supervision;</li><li>coordination of drafting teams;</li><li>ensuring consistency across all Model Programs within the specialization;</li><li>ensuring compliance with the State Standard of Specialized Secondary Education, the Typical Educational Program and methodological guidance approved by MoES;</li><li>internal quality control before submission for independent review.</li></ul><p>Subject Experts may contribute to the development of more than one Model Program draft depending on their qualifications and the implementation methodology proposed by the Consultant.</p><p>All experts shall be engaged on a contractual basis, with clearly defined deliverables, timelines, and performance expectations.</p><p>Component 2. Development of Specialised Model Programs</p><p>The Consultant shall develop forty-one (41) specialised model programs across four (4) specializations defined according to priority economic sectors in accordance with State standard of specialised secondary education, Typical educational program of specialised secondary education in a professional orientation and Procedure for Conducting Expertise, Providing Grades to Educational Literature and Curriculums.The four priority sectors are:</p><ul><li><ul><li>Construction;</li><li>Engineering and technology;</li><li>Information technology;</li><li>Medical</li></ul></li></ul><p>Each program shall:</p><ul><li>integrate general education subjects into applied, sector-specific contexts;</li><li>align with professional standards and occupational requirements;</li><li>reflect labour market needs;</li><li>follow State standard of specialised secondary education and Typical educational program of specialised secondary education;</li><li>be developed in accordance with the academic integrity values.</li></ul><p>The development of every model program draft shall be based on the Typical educational programme for professionally oriented specialised secondary education approved under Order 898 and on the corresponding Typical curriculum plan for each of the four profiles listed above. The list of mandatory educational components for which MPs shall be developed for each profile, together with the corresponding number of teaching hours, hours of independent work, ECTS credits and their distribution between the profile-adaptation cycle (year 1) and the profile cycle (years 2-3), is set out in Annex 1 to this ToR.</p><p>&nbsp;</p><p>Each MP shall comply with the structure and content requirements established in the Typical Educational Programme and shall consist, at minimum, of the following four parts:</p><ul><li>Title page &ndash; name of the ministry/institution; type of programme (model programme / programme based on a model programme / programme not based on a model programme); type of mandatory educational component (subject, discipline, integrated/crosssectoral/special course, module, etc.); programme title; education level; profile of study; educational domain(s); assessment benchmarks (basic or advanced); author(s); year of development;</li><li>Introductory part &ndash; author&#39;s concept and the role and significance of the component; relevance for the selected profile; aim and objectives aligned with the assessment benchmarks of the State Standard and with the chosen profile; references to the relevant educational domain(s) and to professional standards, occupational qualification characteristics or professional prehigher education standards used as a basis; crossreferences to other MPs jointly covering the same mandatory learning outcomes, where applicable; workload in hours and ECTS credits; structural elements; recommended forms of organising the educational process;</li><li>Main part &ndash; titles and workload in hours of structural elements (content lines, sections, topics); expected learning outcomes linked to, and retaining the indexation of, the mandatory learning outcomes of the State Standard; proposed content reflecting professionally oriented, sectorspecific contexts relevant to the profile; recommended learning activities and active/interactive forms of organising learning; recommended methodological support bearing the &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; grif;</li><li>Concluding part &ndash; strategy and methodological recommendations for achieving the expected learning outcomes; description of assessment tools and instruments; reference to possible alternative assessment systems.</li></ul><p>&nbsp;</p><p>Each MP shall be submitted in the following format: paper size A4 (210&times;297 mm); font Times New Roman; main text &ndash; 14 pt; tables, footnotes and supplementary text &ndash; 10&ndash;12 pt; line spacing &ndash; 1.0; continuous page numbering starting from the second page.</p><p>The total workload of each MP, expressed in hours and ECTS credits, shall correspond exactly to the figures established for the relevant educational component for the respective profile, as set out in Annex 1. Any deviation shall be justified in writing by the Consultant and shall require prior written approval by MoES.</p><p>Although the educational domains of the components listed in Annexes 1 are common to all profiles, the content of each MP shall be professionally oriented to the specific profile for which it is developed, in accordance with Section 4 of the Typical Educational Programme. In particular, each MP shall:</p><ul><li>integrate the competency potential and core knowledge of the relevant educational domain(s), as defined by the State Standard, with applied, occupation specific contexts relevant to the profile;</li><li>be consistent with the values, cross cutting skills and recommended forms of learning activity described in the Typical educational rogramme.</li></ul><p>The development cycle shall be completed within <strong>90 working days</strong>.</p><p>Considering the large number of tasks included under this component, it may be practical to divide it into two implementation stages.</p><p>In accordance with the Quality Assurance Plan and MoES regulations the Consultant shall ensure the quality of all specialised model programs developed under this Assignment through a two-tier quality assurance system: (i) the Consultant&#39;s own internal quality assurance process, and (ii) the official State expertise and grif procedure administered by MoES and&nbsp; in accordance with the Procedure for Conducting Expertise and Granting Grifs to Educational Literature and Educational Programmes (MoES Order No. 675 of 5 June 2023).</p><p><strong>Tier 1 - Consultant&#39;s internal quality assurance</strong></p><p>The Consultant shall:</p><ul><li>conduct iterative internal review at each stage of the development cycle;</li><li>ensure consistency of outputs across all profiles through centralised coordination by the Quality Assurance Expert;</li><li>develop all the outputs following the academic integrity values</li></ul><p>The Consultant may conduct iterative internal review at each stage of the development cycle and/or organise independent blind peer review as part of the Consultant&rsquo;s internal quality assurance processes.</p><p><strong>Tier 2 - Submission for the official MoES grif procedure</strong></p><p>Each MP shall be submitted by the Consultant, through MoES to Ukrainian Institute of Education Development for expertise and the grant of the grif &quot;Recommended by the Ministry of Education and Science of Ukraine,&quot; in accordance with the Procedure for Conducting Expertise and Granting Grifs to Educational Literature and Educational Programmes.</p><p>The Consultant shall note that, pursuant to paragraph 6 of Section IV of the Procedure, expertise of model programmes (as objects falling under subparagraph 3 of paragraph 5 of Section I of the Procedure) is exempt from the standard fee-based expertise mechanism. The Consultant&#39;s budget shall accordingly cover only its own internal quality assurance activity.</p><p><strong>&nbsp;Expertise process and timelines to be reflected in the Work Schedule</strong></p><p>The Consultant&#39;s Work Schedule shall account for the following parameters of the official procedure:</p><ul><li>expertise is conducted by at least two members of the relevant Commission and/or expert group, selected by a method of random selection with regard to their professional background, specialisation and place of work;</li><li>the Commission&#39;s reasoned expert opinion is to be expected within two months of submission, unless a different period is agreed;</li><li>where the Commission requires revision, the Consultant shall resubmit the revised MP together with a reasoned response to each comment within 30 calendar days of receipt of the extract from the Commission&#39;s protocol;</li><li>the grif &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; is granted by MoES order and is valid for five years, expiring on 1 July of the relevant year;</li><li>upon granting of the grif, the MP is entered in the public Catalogue of Granted Grifs maintained by MoES and the Institution.</li></ul><p>The Assignment shall be deemed complete in respect of Component 2 only once the full package of drafts of model programs has obtained the grif &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; and has been duly entered in the Catalogue, once each tranche of programs has obtained such confirmation. Evidence of the grant of the grif and of the Catalogue entry shall be annexed to the relevant Interim or Final Completion Report.</p><p>IV. DELIVERABLES</p><p>The Consultant shall deliver the following key deliverables during the implementation of the Assignment.</p><p>Deliverable 1. Inception Report</p><p>Within 20 calendar days from the Effective Date of the Contract, the Consultant shall submit a Draft Inception Report, including:</p><ul><li>work plan and timeline;</li><li>expert mobilisation plan;</li><li>risk assessment and mitigation measures;</li><li>Quality Assurance Plan.</li></ul><p>Deliverable 2. Interim Report on development of the 1st set of Specialised Model Programs</p><p>The following outputs shall be produced under Deliverable 2:</p><ul><li>20 drafts of specialised model programs developed and obtained the grif &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; and has been duly entered in the Catalogue;</li><li>documentation of the development process and quality assurance activities.</li></ul><p>&nbsp;</p><p>Deliverable 3. Interim Report on development of the 2nd set of Specialised Model Programs</p><p>The following outputs shall be produced under Deliverable 2:</p><ul><li>21 drafts of specialised model programs developed and obtained the grif &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; and has been duly entered in the Catalogue;</li><li>documentation of the development process and quality assurance activities.</li></ul><p>Deliverable 4. Final Completion Report</p><p>The following outputs shall be delivered under this deliverable and documented in the Final Completion Report:</p><ul><li>full package with forty-one (41) final approved programs;</li><li>documentation of the development process and quality assurance activities;</li><li>lessons learned and next steps for further implementation.</li></ul><p>The Consultant shall submit a Draft Final Completion Report no later than one month before the completion of the Assignment, summarising overall implementation results, achievement of objectives and targets, key lessons learned, and recommendations for further institutionalisation and sustainability.</p><p>Reports Submission and Acceptance Procedure</p><p>The following procedure shall apply to all reports submitted under this Assignment: the Inception Report (Deliverable 1), Interim Report on development of the 1st set of Specialised Model Programs (Deliverable 2), and Interim Report on development of the 2nd set of Specialised Model Programs (Deliverable 3) and the Final Completion Report (Deliverable 4).</p><p>The exact format of the reports will be discussed and agreed upon with MoES and, where applicable, with the World Bank, upon contract signing and before the commencement of the Assignment. All reports and deliverables will be submitted in a minimum of two (2) hard copies in English and two (2) hard copies in Ukrainian. The products developed (model programs as well as methodological materials for development for Ukrainian-speaking users) shall be submitted in Ukrainian only, without translation, and included as annexes to the relevant reports. All materials developed under this Assignment shall become the property of MoES.</p><p>The Consultant shall submit:</p><ul><li>the draft version of the Inception Report &ndash; within 20 calendar days from the Effective Date;</li><li>the draft version of Interim Report on development of the 1st set of Specialised Model Programs &ndash; no later than the 14th calendar day after completing the delivery of Component 2 activities according to the Work Schedule;</li><li>the draft version of Interim Report on development of the 2nd set of Specialised Model Programs&nbsp; &ndash; no later than the 14th calendar day after completing the delivery of Component 2 activities according to the Work Schedule;</li><li>the draft version of the Final Report &ndash; at latest 30 calendar days before the completion of the services.</li></ul><p>The draft of each report shall be submitted in electronic (Word/Excel and PDF) format to the Client&rsquo;s email address specified in the Contract. The Client will review the draft within 14 calendar days from the date of receipt and provide comments, or confirm the quality and correspondence of the Assignment with the requirements of these Terms of Reference. The Consultant, within 7 calendar days from receipt of comments, shall process them and submit the revised report in electronic and paper format, together with a table indicating, for each comment, the method of its consideration or justification for any deviation.</p><p>If the Client has no comments on the revised report, the report shall be deemed approved, which shall be confirmed by a signed Acceptance Certificate for Services. If the Client does not respond with comments within the above-mentioned period, the draft report shall be deemed accepted.</p><p>If required by MoES, the Consultant shall provide ad-hoc reports within 3&ndash;7 calendar days, depending on the complexity of the request.</p><p>V. REQUIREMENTS</p><p>5.1 Consultant</p><p>The Consultant must be a legally registered firm or a Joint Venture / Consortium of firms.</p><p><strong>Minimum Qualification Requirements (Pass/Fail Basis)</strong></p><p>Failure to meet any of the requirements below shall result in disqualification.</p><p><strong>Core Business and Experience</strong></p><ul><li>At least 3 (three) years of experience in education, curriculum development, institutional development, or related fields;</li><li>At least 3 (three) successfully completed assignments during the last 6 years in one or more of the following areas:</li></ul><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; curriculum development or educational program design;</p><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; vocational education or education sector projects;</p><p>&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; capacity building programs for education institutions.</p><p>In case of a Joint Venture / Consortium (JVCA), the Lead Member shall demonstrate substantial compliance with the above requirements, including at least 3 (three) years of relevant experience and participation in at least 2 (two) relevant assignments. The JVCA as a whole must meet all qualification requirements.</p><p><strong>Financial Capacity</strong></p><ul><li>Average annual turnover for the last 3 completed financial years shall be at least USD 150,000 or equivalent.</li></ul><p>&nbsp;In case of a JVCA: Lead Member: minimum 50% of the annual turnover requirement; Other members: minimum 25% of the annual turnover requirement; Combined: must fully meet the annual turnover requirement. Audited financial statements or verified financial documents shall be provided.</p><p><strong>Experience with Donor-Funded Projects</strong></p><ul><li>At least one assignment financed by international financial institutions or bilateral donors (e.g., World Bank, EBRD, EU, GIZ, UNICEF, etc.) within the last 5 years is an advantage.</li></ul><p>5.2 Staff</p><p>5.2.1 Minimum expected staff inputs</p><p>The Consultant shall provide suitably qualified professionals in terms of expertise and time allocation to complete the activities required under the scope of work and to finally achieve the objectives of the Assignment in terms of time, costs and quality, within the agreed timeframe.</p><p>The Consultant shall also provide adequate administrative staff (secretaries, translators, etc.) needed to support the expert team.</p><p>The minimum expected staff inputs for the Assignment are summarised below.</p><p><strong>Minimum staff inputs</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:584px\"><tbody><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:32px; vertical-align:top; width:373px\"><p><strong>Experts</strong></p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:32px; vertical-align:top; width:211px\"><p><strong>Total Working Man-Months</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:38px; width:0px\">&nbsp;</td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:584px\"><p><strong>Key Experts</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Project Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>6</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Expert (Curriculum Development)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>6</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Expert (Quality Assurance)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>6</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Expert (Sectoral)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>16</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p><strong>Total Key Experts man-months:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p><strong>34</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:584px\"><p><strong>Non-Key Experts</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Subject Experts</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>82</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p><strong>Total Non-Key Experts man-months:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p><strong>82</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:584px\"><p><strong>Supporting Staff</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Editing assistant</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>3</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Administrative assistant</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>3</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p>Financial assistant</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p>3</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:373px\"><p><strong>Total Supporting Staff man-months:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:32px; vertical-align:top; width:211px\"><p><strong>9</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:373px\"><p><strong>TOTAL MINIMUM EXPECTED STAFF INPUTS:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:211px\"><p><strong>125</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:57px; width:0px\">&nbsp;</td></tr></tbody></table><p>*One working month is equal to 22 working days 8 working hours per day&nbsp;</p><p>5.2.2. Qualifications of Key Experts</p><p><strong>KE1. Team Leader / Project Manager</strong></p><p><strong>Responsibilities:</strong></p><ul><li>overall coordination of the Assignment;</li><li>primary contact point for MoES;</li><li>oversight of quality assurance and reporting;</li><li>supervision of all experts and timely delivery of outputs.</li></ul><p><strong>Qualifications:</strong></p><ul><li>a Master&rsquo;s degree or higher in a relevant field is required;</li><li>at least 10 years of professional experience;</li><li>at least 5 years of experience in managing curriculum development or education-related projects;</li><li>minimum 10 years of teaching experience at a vocational (professional), PPHE or higher education institution;</li><li>experience with donor-funded projects;</li><li>excellent command of Ukrainian and English.</li></ul><p>&nbsp;</p><p><strong>KE2. Curriculum Development Expert</strong></p><p><strong>Responsibilities:</strong></p><ul><li>methodological leadership for program design;</li><li>development of unified development methodology;</li><li>coordination of program development process across sectors.</li></ul><p><strong>Qualifications:</strong></p><ul><li>A PhD (or Candidate of Sciences / Doctor of Philosophy degree) in a relevant field;</li><li>at least 7 years of experience in curriculum development or education reform;</li><li>minimum 10 years of teaching experience at a vocational (professional), PPHE or higher education institution;</li><li>experience in developing competency-based educational programs;</li><li>excellent command of Ukrainian and English.</li></ul><p><strong>KE3. Sectoral Experts </strong>(Construction; Engineering and technology; Information technology; Medical)</p><p><strong>Responsibilities:</strong></p><ul><li>provision of sector-specific expertise for program development;</li><li>ensuring alignment with professional standards and occupational requirements;</li><li>engagement with sectoral stakeholders and industry representatives.</li></ul><p><strong>Qualifications:</strong></p><ul><li>at least a Master&rsquo;s degree of higher education in the relevant sector;</li><li>at least 7 years of professional experience in an educational institution in teaching and/or academic positions would be an advantage;</li><li>experience in vocational education or curriculum development is an advantage;</li><li>excellent command of Ukrainian and English;</li><li>A PhD (or Candidate of Sciences / Doctor of Philosophy degree) in a relevant field would be considered an asset.</li></ul><p><strong>KE4. Quality Assurance Expert</strong></p><p><strong>Responsibilities:</strong></p><ul><li>development and ensuring effective performance of internal quality assurance system, including design and implementation of the Quality Assurance Plan;</li><li>ensuring consistency and compliance across all programs;</li></ul><p><strong>Qualifications:</strong></p><ul><li>at least a Master&rsquo;s degree;</li><li>at least 7 years of experience in quality assurance in education;</li><li>minimum 10 years of teaching experience at a vocational (professional), PPHE or higher education institution;</li><li>demonstrated experience in curriculum validation and review processes.</li><li>excellent command of Ukrainian and English;</li><li>a PhD (or Candidate of Sciences / Doctor of Philosophy degree) in a relevant field would be considered an asset.</li></ul><p>5.2.3 Qualifications of Non Key experts</p><p>In addition to the Key Experts, the Consultant will engage Non-Key Experts for the proper implementation of the Assignment. for the development, review, and finalisation of model programs.</p><p>Qualifications:</p><ul><li>Master&#39;s degree (minimum) in the relevant subject area; PhD is an advantage;</li><li>at least 5 years of teaching or subject-matter experience at vocational (professional), PPHE, or higher education institutions;</li><li>proven experience in curriculum or educational content development;</li><li>knowledge of national education standards and professional standards in the relevant sector;</li><li>fluent command of the Ukrainian language; working knowledge of English is an advantage.</li></ul><p>The Consultant shall ensure that all Non-Key Experts possess qualifications and experience relevant to the tasks assigned to them under the Assignment.</p><p>The involvement, number, profile and level of effort of Non-Key Experts shall be proposed by the Consultant in the technical proposal and further specified in the Inception Report and staffing plan. The MOES approval to a proposed Non-Key Expert shall be obtained prior to mobilisation based on a curriculum vitae supplied by the Consultant.</p><p>5.2.4 Supporting Staff</p><p>The Consultant shall provide adequate supporting staff (editor, administrative assistant, financial assistant) needed to support the expert team throughout the Assignment.</p><p>Supporting staff shall meet the following minimum requirements:</p><ul><li>higher education relevant to the respective function (e.g., philology/linguistics for editors, finance/accounting for the financial assistant, administration/office management for the administrative assistant);</li><li>at least 3 years of general working experience in the relevant field;</li><li>fluent command of the Ukrainian language (written and spoken); knowledge of English is an advantage for roles involving communication with international stakeholders.</li></ul><p>VI. IMPLEMENTATION ARRANGEMENTS</p><p>The Client shall be responsible for the implementation of the overall Project and the Consultant&rsquo;s Assignment shall be managed and monitored by the Client&rsquo;s Implementation Group.</p><p>The Consultant shall:</p><ul><li>provide all technical, organisational and administrative support;</li><li>ensure availability of experts according to the work plan;</li><li>manage team performance and delivery quality;</li><li>ensure compliance with timelines and deliverables.</li></ul><p>MoES shall:</p><ul><li>provide regulatory framework and templates;</li><li>review and approve deliverables;</li><li>facilitate coordination with stakeholders.</li></ul><p>All materials developed under this Assignment shall become the property of MoES.</p><p>VII. PAYMENT SCHEDULE</p><p>Payment for Consultancy Services shall be made upon completion of activities covered by the respective Deliverables&nbsp; and acceptance of the final versions of the reports by MoES, including formal approval of the model programs.</p><p>Payment for Consultancy Services shall be made in accordance with the following schedule:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:612px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:34px; vertical-align:top; width:188px\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:34px; vertical-align:top; width:293px\"><p><strong>Timeline</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:34px; vertical-align:top; width:131px\"><p><strong>% of Contract Value</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:188px\"><p>Deliverable 1. Inception Report</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:293px\"><p>Draft version &ndash; within 20 calendar days; final version &ndash; within 41 calendar days from Effective Date</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:131px\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:188px\"><p>Deliverable 2. Interim Report on development of the 1st set of Specialised Model Programs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:293px\"><p>Draft version &ndash; no later than the 14th calendar day, and final version &ndash; no later than the 35th calendar day after completing Component 2 activities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:131px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:188px\"><p>Deliverable 3. Interim Report on development of the 2nd set of Specialised Model Programs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:293px\"><p>Draft version &ndash; no later than the 14th calendar day, and final version &ndash; no later than the 35th calendar day after completing Component 2 activities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:131px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:188px\"><p>Deliverable 4. Final Completion Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:293px\"><p>Draft version &ndash; at latest 30 calendar days before completion; final version &ndash; at latest 9 calendar days before completion of services</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:131px\"><p>20%</p></td></tr></tbody></table><p>&nbsp;</p><p>VIII. IMPLEMENTATION TIMELINE</p><p>The Assignment shall be implemented over a period of six (6) months from the Effective Date of the Contract. Implementation shall follow the phased approach outlined below.</p><p>Component 1 &ndash; Expert Mobilisation and Coordination (Month 1)</p><p><strong>Key activities:</strong></p><ul><li>mobilisation of the expert team;</li><li>finalisation of work plan and timeline;</li><li>preparing Quality Assurance Plan;</li><li>preparation and submission of the Inception Report.</li></ul><p><strong>Key milestone:</strong></p><ul><li>Approved Inception Report.</li></ul><p>Component 2 &ndash; Development of Specialised Model Programs (Months 2&ndash;6)</p><p><strong>Key activities:</strong></p><ul><li>development of 41 drafts of specialised model programs across 4 priority sectors;</li><li>iterative internal quality assurance;</li><li>approving and obtaining the grif &quot;Recommended by the Ministry of Education and Science of Ukraine&quot; .</li></ul><p><strong>Key milestone:</strong></p><ul><li>41 specialised model programs developed and submitted for approval within 90 working days.</li></ul><p>&nbsp;</p><p><strong>Annex 1</strong></p><p><strong>LIST</strong></p><p><strong>of model programs to be developed</strong></p><p><strong>&nbsp;Profile: CONSTRUCTION (10 programs)</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:655px\"><tbody><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:36px; vertical-align:top; width:211px\"><p>Educational components by educational domains</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:36px; width:184px\"><p>Workload, hours</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:36px; vertical-align:top; width:83px\"><p>Workload, ECTS</p><p>credits</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:36px; vertical-align:top; width:177px\"><p>Direct instruction time by training cycle</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>Direct instruction time</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>Self- study</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>Total</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>Profile-adaptation cycle</p><p>(1 year)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>Profile cycle</p><p>(2 years)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Language and Literature educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated literature course (Ukrainian and foreign)</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>385</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>155</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>540</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>18</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>124</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>261</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Foreign language for professional purposes</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>210</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>300</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>130</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Mathematical educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated mathematics course</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>252</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>108</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>360</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>147</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Natural sciences educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated course in physics and astronomy</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>189</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>81</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>270</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>166</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>23</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>&nbsp;Chemistry</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>45</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>150</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated course in geography and biology</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>45</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>150</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>65</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>40</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Technology educational area and arts educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated course in technology and arts</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>70</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Informatics educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>&nbsp;Digital technologies</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>45</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>150</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>70</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Social and Health-Preservation educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Wellbeing and safety</li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>70</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>20</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>90</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>45</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>25</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><p><strong>Civic and Historical educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:211px\"><ol><li>Integrated course in history and civic education</li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>245</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>115</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:51px\"><p>360</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\"><p>12</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\"><p>80</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:77px\"><p>165</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Profile: ENGINEERING AND TECHNOLOGY (10 programs)</strong></p><p><strong>&nbsp;</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:660px\"><tbody><tr><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top; width:211px\"><p>Educational components by educational domains</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top; width:187px\"><p>Workload, hours</p></td><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top; width:83px\"><p>Workload, ECTS</p><p>credits</p><p>&nbsp;</p></td><td colspan=\"2\" rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top; width:179px\"><p>Direct instruction time by training cycle</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:50px; width:0px\">&nbsp;</td></tr><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:83px\"><p>Direct instruction time</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:54px\"><p>Self- study</p><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:50px\"><p>Total</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:23px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:81px; vertical-align:top; width:102px\"><p>Profile-adaptation</p><p>cycle</p><p>(1 year)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:81px; vertical-align:top; width:77px\"><p>Profile cycle</p><p>(2 years)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:101px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Language and Literature educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:211px\"><ol><li>Integrated language and literature course (Ukrainian language, Ukrainian and foreign literature)</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:83px\"><p>385</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:54px\"><p>155</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:50px\"><p>540</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:83px\"><p>18</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:102px\"><p>124</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:96px; vertical-align:top; width:77px\"><p>261</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:120px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><ol><li>Foreign language for professional purposes</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>210</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>300</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>130</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Mathematical educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><ol><li>Integrated mathematics course</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>315</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>135</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>450</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>105</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>210</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Natural sciences educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><ol><li>Integrated course in physics and astronomy</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>252</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>108</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>360</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>189</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>63</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:211px\"><ol><li>Chemistry</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:83px\"><p>84</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:54px\"><p>36</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:50px\"><p>120</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:83px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:102px\"><p>84</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:25px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><ol><li>Integrated course in geography and biology</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>63</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>27</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>63</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Technology educational area and arts educational area</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><ol><li>Integrated course in technology and arts</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>70</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:211px\"><p><strong>Informatics educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:25px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:211px\"><ol><li>Digital technologies</li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:83px\"><p>105</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:54px\"><p>45</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:50px\"><p>150</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:83px\"><p>5</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:102px\"><p>35</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top; width:77px\"><p>70</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:26px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Social and Health-Preservation educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:211px\"><ol><li>Wellbeing and safety</li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:83px\"><p>70</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:54px\"><p>20</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:50px\"><p>90</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:83px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:102px\"><p>45</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:77px\"><p>25</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:42px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:211px\"><p><strong>Civic and Historical educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:54px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:50px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:83px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:77px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:49px; width:0px\">&nbsp;</td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:211px\"><ol><li>Integrated course in history and civic education</li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:83px\"><p>245</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:54px\"><p>115</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:50px\"><p>360</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:83px\"><p>12</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:102px\"><p>80</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:77px\"><p>165</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:73px; width:0px\">&nbsp;</td></tr></tbody></table><p><strong>&nbsp;</strong></p><p><strong>Profile: MEDICAL (11 programs)</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:629px\"><tbody><tr><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:53px; vertical-align:top; width:209px\"><p>Educational components by educational domains</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:53px; vertical-align:top; width:178px\"><p>Workload, hours</p></td><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:53px; vertical-align:top; width:83px\"><p>Workload, ECTS</p><p>credits</p><p>&nbsp;</p></td><td colspan=\"2\" rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:53px; vertical-align:top; width:143px\"><p>Direct instruction time by training cycle</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:53px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:59px\"><p>Direct instruction time</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:56px\"><p>Self- study</p><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:63px\"><p>Total</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:38px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; vertical-align:top; width:87px\"><p>Profile- adaptation</p><p>cycle</p><p>(1 year)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; vertical-align:top; width:56px\"><p>Profile cycle</p><p>&nbsp;(2 years)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:97px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:209px\"><p>Language and Literature educational area</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:46px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:46px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:209px\"><ol><li><strong>Integrated language and literature course (Ukrainian language, Ukrainian and foreign literature)</strong></li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:59px\"><p><strong>385</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:56px\"><p><strong>165</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:63px\"><p><strong>540</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:83px\"><p><strong>18</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:87px\"><p><strong>124</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:125px; vertical-align:top; width:56px\"><p><strong>261</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:125px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:209px\"><p><strong>2.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Foreign language for professional purposes</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:59px\"><p><strong>300</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:56px\"><p><strong>120</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:63px\"><p><strong>420</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:83px\"><p><strong>14</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:87px\"><p><strong>150</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:56px\"><p><strong>150</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:47px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:209px\"><p>Mathematical educational area</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:42px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:209px\"><p><strong>3.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated mathematics course</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:59px\"><p><strong>252</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:56px\"><p><strong>108</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:63px\"><p><strong>360</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:83px\"><p><strong>12</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:87px\"><p><strong>105</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:56px\"><p><strong>147</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:41px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:209px\"><p>Natural sciences educational area</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:47px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:209px\"><p><strong>4.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in physics and astronomy</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:59px\"><p><strong>63</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:56px\"><p><strong>27</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:63px\"><p><strong>90</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:83px\"><p><strong>3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:43px; vertical-align:top; width:56px\"><p><strong>63</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:43px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:209px\"><p><strong>5.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Chemistry</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:59px\"><p><strong>147</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:56px\"><p><strong>63</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:63px\"><p><strong>210</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:83px\"><p><strong>7</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:87px\"><p><strong>147</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:22px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:209px\"><p><strong>6.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Biology</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:59px\"><p><strong>126</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:56px\"><p><strong>54</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:63px\"><p><strong>180</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:83px\"><p><strong>6</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:87px\"><p><strong>126</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:20px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:209px\"><p><strong>7.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Geography</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:59px\"><p><strong>63</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:56px\"><p><strong>27</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:63px\"><p><strong>90</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:83px\"><p><strong>3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:56px\"><p><strong>63</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:24px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:209px\"><p>Technology educational area and arts educational area</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:67px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:67px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:209px\"><p><strong>8.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in technology and arts</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:59px\"><p><strong>70</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:56px\"><p><strong>20</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:63px\"><p><strong>90</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:83px\"><p><strong>3</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:56px\"><p><strong>70</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:38px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:209px\"><p>Informatics educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:22px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:209px\"><p><strong>9.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Digital technologies</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:59px\"><p><strong>126</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:56px\"><p><strong>54</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:63px\"><p><strong>180</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:83px\"><p><strong>6</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:87px\"><p><strong>70</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:56px\"><p><strong>56</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:28px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:209px\"><p>Social and Health-Preservation educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:71px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:209px\"><p><strong>10.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Wellbeing and safety</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:59px\"><p><strong>70</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:56px\"><p><strong>20</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:63px\"><p><strong>90</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:83px\"><p><strong>3</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:87px\"><p><strong>45</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:56px\"><p><strong>25</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:52px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:209px\"><p>Civic and Historical educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:59px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:63px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:83px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:87px\"><p><strong>&nbsp;</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; vertical-align:top; width:56px\"><p><strong>&nbsp;</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:42px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:209px\"><p><strong>11.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in history and civic education</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:59px\"><p><strong>245</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:56px\"><p><strong>115</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:63px\"><p><strong>360</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:83px\"><p><strong>12</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:87px\"><p><strong>40</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:56px\"><p><strong>205</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:71px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Profile: INFORMATION TECHNOLOGY (10 programs)</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:614px\"><tbody><tr><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:74px; vertical-align:top; width:187px\"><p>Educational components by educational domains</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:74px; vertical-align:top; width:182px\"><p>Workload, hours</p></td><td rowspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:74px; vertical-align:top; width:75px\"><p>Workload, ECTS</p><p>credits</p></td><td colspan=\"2\" rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:74px; vertical-align:top; width:154px\"><p>Direct instruction time by training cycle</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:74px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; vertical-align:top; width:74px\"><p>Direct instruction time</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; vertical-align:top; width:57px\"><p>Self- study</p><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; vertical-align:top; width:51px\"><p>Total</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:31px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:91px; vertical-align:top; width:88px\"><p>Profile-adaptation</p><p>cycle</p><p>(1 year)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:91px; vertical-align:top; width:66px\"><p>Profile cycle</p><p>(2 years)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:91px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p>Language and Literature educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:187px\"><ol><li><strong>Integrated language and literature course (Ukrainian language, Ukrainian and foreign literature)</strong></li></ol></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:74px\"><p>385</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:57px\"><p>155</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:51px\"><p>540</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:75px\"><p>18</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:88px\"><p>124</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:145px; vertical-align:top; width:66px\"><p>261</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:145px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p><strong>2.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Foreign language for professional purposes</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>263</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>127</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>390</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>13</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>133</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>130</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:187px\"><p>Mathematical educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:51px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:187px\"><p><strong>3.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated mathematics course</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:74px\"><p>420</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:57px\"><p>180</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:51px\"><p>600</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:75px\"><p>20</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:88px\"><p>197</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:66px\"><p>223</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:52px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:187px\"><p><strong>Natural sciences educational area</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:51px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:51px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p><strong>4.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in physics and astronomy</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>84</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>36</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>120</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>4</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>84</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:187px\"><p><strong>5.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Chemistry</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:74px\"><p>63</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:57px\"><p>27</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:51px\"><p>90</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:75px\"><p>3</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:88px\"><p>63</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:33px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p><strong>6.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in geography and biology</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>84</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>36</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>120</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>84</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p>Technology educational area and arts educational area</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:187px\"><p><strong>7.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in technology and arts</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:74px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:57px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:51px\"><p>90</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:75px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:66px\"><p>70</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:44px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:187px\"><p>Informatics educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:41px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:187px\"><p><strong>8.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Digital technologies</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:74px\"><p>273</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:57px\"><p>117</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:51px\"><p>390</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:75px\"><p>13</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:88px\"><p>80</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:44px; vertical-align:top; width:66px\"><p>193</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:44px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:187px\"><p>Social and Health-Preservation educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:57px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:187px\"><p><strong>9.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Wellbeing and safety</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:74px\"><p>70</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:57px\"><p>20</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:51px\"><p>90</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:75px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:53px; vertical-align:top; width:66px\"><p>70</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:53px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:187px\"><p>Civic and Historical educational area</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:74px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:57px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:51px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:88px\"><p>&nbsp;</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:52px; vertical-align:top; width:66px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:52px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:187px\"><p><strong>10.</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Integrated course in history and civic education</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:74px\"><p>245</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:57px\"><p>115</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:51px\"><p>360</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:75px\"><p>12</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:88px\"><p>40</p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:70px; vertical-align:top; width:66px\"><p>205</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:70px; vertical-align:top; width:16px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00467076","notice_type":"Request for Expression of Interest","noticedate":"04-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-04T00:00:00Z","submission_deadline_time":"16:45","project_ctry_name":"Western and Central Africa","project_id":"P500628","project_name":"Western Africa Regional Digital Integration Program - Series of Projects 2","bid_reference_no":"LR-MOPT-536338-CS-QCBS","bid_description":"Hiring of Consultant for Legal Advisory Services and Amendment of the Telecommunications Act (2007) Development of a Dig-One policy, and Drafting Infrastructure Sharing Regulations.","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"McDonald & Carey Streets\n1000 Monrovia, 10 Liberia","contact_ctry_name":"Liberia","contact_email":"swaraymas@mopt.gov.lr","contact_name":"Mohammed  Swaray","contact_organization":"Ministry of Posts and Telecommunications","contact_phone_no":"+231 88 652 4425","submission_date":"2026-09-04T00:00:00Z","notice_text":"<p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:585px\"><tbody><tr><td style=\"background-color:#ffffff; border-bottom:2px solid #a8d08d; border-left:none; border-right:none; border-top:none; vertical-align:top; width:584px\"><p><strong>Republic of Liberia</strong></p><p><strong>Ministry of Posts and Telecommunications</strong></p><p><strong>Western African Regional Digital Integration Project &ndash; Series of Projects 2 Liberia (WARDIP SOP2-Liberia)</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong><strong>Project ID: P500628</strong></strong></p><p>&nbsp;</p><p><strong><strong>Terms of Reference </strong></strong></p><p>For</p><p>Recruitment of a firm to conduct Legal &amp; Transaction Advisor for the Structuring and Capitalization of the Amilcar Cabral Cable Consortium of Liberia&nbsp;(AC3-Liberia)</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:1px solid #7e7e7e; vertical-align:top; width:205px\"><p><strong><strong>Post Title:</strong></strong></p></td><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:1px solid #7e7e7e; vertical-align:top; width:402px\"><p>Legal and Transaction Advisory Consultant for AC3-Liberia.</p></td></tr><tr><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:205px\"><p><strong><strong>Location of Post:</strong></strong></p></td><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:402px\"><p>Monrovia, Liberia</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:205px\"><p><strong><strong>Contract Duration:</strong></strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:402px\"><p>36 weeks</p></td></tr><tr><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:205px\"><p><strong><strong>Reporting Line:</strong></strong></p></td><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:402px\"><p>WARDIP Liberia/PIU through the PIU Coordinator</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:205px\"><p><strong><strong>Recruitment Type:</strong></strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:402px\"><p>Local</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:205px\"><p><strong><strong>Type of Contract</strong></strong></p></td><td style=\"border-bottom:1px solid #7e7e7e; border-left:none; border-right:none; border-top:none; vertical-align:top; width:402px\"><p>&nbsp;&nbsp;&nbsp;&nbsp;Individual Consultant</p><p>X&nbsp;Consulting Firm (QCBS, CQS, LCS)</p><p>&nbsp;&nbsp;&nbsp;&nbsp;Non-Consulting Service (Competitive Bidding)</p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><strong>1. PROJECT BACKGROUND</strong></strong></p><p>&nbsp;</p><p>The Government of Liberia (GoL) has received financing from the World Bank for the preparation of the West Africa Regional Digital Integration Project - Series of Projects 2 Liberia (WARDIP SOP2-Liberia). This project, which will be implemented at the national level, seeks to facilitate increased broadband access and usage in preparation for regional digital markets integration in West Africa.</p><p>&nbsp;</p><p>WARDIP SOP2-Liberia is the second phase of the Western Africa Regional Development Integration Program series of projects (DTfA &ndash; WARDIP), which builds consensus and momentum around the vision for achieving a Single Digital Market (SDM) in Africa. It is envisioned that the project will lead to an increased secure flow of digital services within and between participating countries in Western Africa. By the end of the SOP, foundations of a SDM in Western Africa in line with the AU SDM are expected to be in place.</p><p>&nbsp;</p><p>WARDIP SOP2 builds on, and will run parallel to, investments in DTfA/WARDIP SOP1, further extending cross-border and backbone connectivity, data markets and online market environment in additional countries. It aims to increase broadband access and usage in participating countries and to advance the integration of digital markets in Western Africa and is structured to have 5 components.</p><p>&nbsp;</p><ul><li><em><em>Component I. Connectivity Market Development and Integration</em></em><strong><strong>: </strong></strong>This component aims to provide infrastructure financing and support for an enhanced enabling environment to develop the regional broadband connectivity market.</li><li><em><em>Component II: Data Market Development and Integration</em></em><strong><strong>: </strong></strong>This component aims to build trust in online transactions and strengthen the security and resilience of digital infrastructure and systems, focused on focuses on enabling secure, cross-border data exchange, storage, and processing to support regional access to data-driven services, innovation, and infrastructure.&nbsp;</li><li><em><em>Component III. Online Market Development and Integration:</em></em><strong>&nbsp;</strong>This component aims to support the development of a robust regional online market, with a focus on boosting service uptake for an integrated SDM.</li><li><em><em>Component IV. Project Management and Implementation Support. </em></em>This component would provide technical assistance and capacity support for program preparation and implementation.</li><li><em><em>Component V. Contingent Emergency Response. </em></em>The component is included to help participating countries respond swiftly to eligible crises and emergencies, in case of urgent need of assistance or capacity constraints.</li></ul><p>&nbsp;</p><p>Access to affordable, reliable, and resilient international internet connectivity is essential for Liberia&rsquo;s digital transformation, economic growth, and social inclusion. Over the past decade, Liberia has significantly strengthened its digital infrastructure through its connection to the Africa Coast to Europe (ACE) submarine cable system, financed under the World Bank&ndash;supported West Africa Regional Communications Infrastructure Program (WARCIP). The ACE system has substantially expanded international bandwidth capacity, reduced wholesale prices, and enabled growth across Liberia&rsquo;s digital economy.</p><p>&nbsp;</p><p>Despite these improvements, Liberia currently relies almost entirely on a single submarine cable. As demand for data and digital services continues to rise&mdash;driven by increased mobile data usage, digital government rollout, enterprise connectivity needs, and cloud adoption&mdash;dependence on one international link exposes the country to serious risks, including outages, rising operational costs, and vulnerability to disruptions. Strengthening the redundancy, diversity, and resilience of Liberia&rsquo;s international connectivity has therefore become a national priority.</p><p>&nbsp;</p><p>To address this strategic need, the Government of Liberia, through the Ministry of Posts and Telecommunications (MoPT) and with support under the West Africa Regional Digital Integration Program (WARDIP), is advancing plans for a second international submarine cable landing in Liberia. While the specific system has not yet been finalized, the new submarine cable initiative is expected to provide the country with additional capacity, enhanced redundancy, improved competition, and greater resilience&mdash;supporting Liberia&rsquo;s long-term digital transformation ambitions.</p><p>&nbsp;</p><p>Planning for the second cable has been informed by a multi-country technical and financial feasibility assessment conducted by TACTIS, which examined future international capacity needs, technology options, landing site considerations, commercial structures, and governance arrangements across participating West African countries. For Liberia, the assessment confirmed that a second submarine cable is both technically viable and commercially justified. It identified strong and growing bandwidth demand and the need to reduce the risks associated with dependence on ACE. These findings reinforce the urgency of establishing a second connection and the importance of designing a sound ownership, governance, and financing structure.</p><p>&nbsp;</p><p>To ensure efficient, transparent, and sustainable management of Liberia&rsquo;s stake in the future cable system, the Government and private sector actors have agreed to establish a dedicated Special Purpose Vehicle (SPV)&mdash;the Amilcar Cabral Cable Consortium of Liberia (AC3-Liberia). Liberia&rsquo;s major Mobile Network Operators (MNOs) and Internet Service Providers (ISPs) have signed a non-binding Memorandum of Understanding (MoU) expressing their intention to jointly establish and capitalize the SPV. The Government of Liberia will participate as a minority shareholder, providing policy alignment and strategic oversight while e</p><p>nsuring that ownership and operational control remain led by the private sector&mdash;consistent with global best practices for submarine cable wholesale governance.</p><p>&nbsp;</p><p>The SPV will ultimately hold Liberia&rsquo;s ownership interest in the second submarine cable system, including the landing station and any associated terrestrial infrastructure. To become operational, AC3-Liberia requires a complete set of legal, regulatory, commercial, and financial structuring actions, including incorporation, preparation of foundational corporate instruments, design of governance arrangements, valuation of contributions (including in-kind assets), financial modeling, assessing the need for additional investors, and preparing the SPV for financial close. The SPV must be designed to remain fully viable even if no external investors join initially, while retaining flexibility to accommodate new private-sector or development finance institution (DFI) participation in the future.</p><p>&nbsp;</p><p>To support this effort, the Government of Liberia seeks to engage a <strong><strong>single qualified advisory firm</strong></strong>&nbsp;to provide <strong><strong>integrated legal and transaction advisory services</strong></strong>. The Advisor will assist the Government and the prospective shareholders in establishing AC3-Liberia as a legally compliant, financially sound, and commercially sustainable SPV capable of achieving financial close for the second submarine cable. The integrated nature of the assignment ensures that legal, commercial, and financial dimensions are fully aligned, reducing risks and enabling the creation of a robust and professionally governed entity that will safeguard Liberia&rsquo;s long-term international connectivity.</p><p>&nbsp;&nbsp;&nbsp;</p><p><strong><strong>2. OBJECTIVE OF THE ASSIGNMENT</strong></strong></p><p>&nbsp;</p><p>The objective of this assignment is to structure AC3-Liberia as a financially viable, commercially sustainable, and operationally sound Special Purpose Vehicle (SPV) that reflects a majority private-sector ownership model with the Government of Liberia participating as a minority shareholder. The Advisor will provide integrated legal, commercial, and financial structuring support to ensure that the SPV is established on a sound foundation and is capable of achieving financial close and operational readiness for the new cable landing.</p><p>&nbsp;</p><p>A core objective is the legal establishment and operationalization of AC3-Liberia. The Advisor will lead the drafting of all corporate legal instruments&mdash;including the Articles of Incorporation, Bylaws, Shareholders&rsquo; Agreement, Subscription Agreements, Governance Framework, and related documentation&mdash;and will manage the full registration process with the Liberia Business Registry and other national authorities. The assignment includes ensuring compliance with Liberian company law, telecommunications regulations, tax requirements, and all World Bank/WARDIP obligations, including safeguards, transparency, and good governance standards.</p><p>&nbsp;</p><p>In parallel, the assignment aims to design and structure AC3-Liberia as a financially sustainable and bankable entity. The Advisor will assess capital requirements, develop a comprehensive financial model, and design a capital structure that reflects a majority private-sector ownership model with the Government participating as a minority shareholder. This includes valuing all shareholder contributions, incorporating the Government&rsquo;s confirmed cash equity contribution, and identifying and valuing potential in-kind contributions that could strengthen the SPV&rsquo;s capital base. The SPV must remain fully viable even if no additional investors join initially, while retaining flexibility to accommodate new private-sector investors or Development Finance Institutions (DFIs) should such participation later be deemed beneficial.</p><p>&nbsp;</p><p>A third objective is to support investor readiness and capital mobilization options. The Advisor will assess whether attracting additional private investors or DFIs could bring financial, operational, or strategic value to the SPV. If justified, the Advisor will conduct targeted market sounding and provide recommendations on next steps. Any competitive investor selection process will only be undertaken if clearly warranted and approved by the Consortium.</p><p>&nbsp;</p><p>A fourth objective is to ensure strong alignment between financial structuring and legal documentation. The Advisor will integrate legal and transaction advisory functions so that corporate instruments, commercial agreements, capitalization arrangements, IRU structures, risk allocation provisions, and governance mechanisms are coherent and mutually reinforcing. The assignment includes guiding the Government and private operators through negotiations, ensuring that all agreements are commercially sound, enforceable, and aligned with the long-term sustainability of the SPV.</p><p>&nbsp;</p><p>Finally, the Advisor will guide AC3-Liberia through the process of <strong><strong>achieving financial close and becoming fully operational</strong></strong>. This includes preparing conditions precedent, capitalization steps, subscription arrangements, and the full set of documentation required by investors and financiers. The Advisor will prepare a complete financial close package and provide a clear roadmap for implementation, ensuring that AC3-Liberia is positioned to execute the submarine cable project effectively.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><strong>3. SCOPE OF WORK</strong></strong></p><p>&nbsp;</p><p>The Consultant will provide comprehensive legal, commercial, and financial advisory services necessary for the establishment, structuring, operationalization, and capitalization of the Amilcar Cabral Cable Consortium of Liberia (AC3-Liberia). The scope covers all tasks required to (i) incorporate the SPV as a legally compliant entity, (ii) design and negotiate its governance and capital structure, (iii) prepare it for financial close, and (iv) ensure long-term sustainability and readiness to manage Liberia&rsquo;s second international submarine cable landing.</p><p>&nbsp;</p><p>This engagement includes, but is not limited to the following:</p><p>&nbsp;</p><p><strong>Phase 1: Corporate &amp; Regulatory Foundations</strong></p><p>&nbsp;</p><ol><li><strong><strong>Review of Legal &amp; Regulatory Framework:</strong></strong>&nbsp;Review Liberian laws, regulations, and administrative requirements relevant to establishing and operationalizing AC3-Liberia, including company law, investment law, SPV formation requirements, telecommunications licensing, international cable-landing and access regulations, foreign/domestic ownership rules, tax obligations, and any PPP or procurement frameworks. Identify regulatory obligations applicable during establishment, operation, capitalization, and future expansion.</li><li><strong><strong>Review of Existing MoU and Documentation: </strong></strong>Analyze the existing non-binding MoU among the MNO/ISP members and identify any issues requiring refinement during incorporation. Review all available project documentation and identify areas requiring legal, commercial, or financial alignment before SPV formation.</li><li><strong><strong>Initial Structuring Readiness Assessment:</strong></strong>&nbsp;Review the prior technical, commercial, and financial work completed to date&mdash;including the TACTIS feasibility analysis&mdash;to validate assumptions, identify information gaps, and determine implications for SPV structuring. Provide immediate recommendations to support legal and institutional readiness.</li><li><strong><strong>Preliminary Risk Identification: </strong></strong>Identify major early-stage legal, commercial, financial, and governance risks and provide initial mitigation strategies, to be refined throughout subsequent phases.</li></ol><p>&nbsp;</p><p><strong>Phase 2: Financial Feasibility, Commercial Model Options, and SPV Capital Structure </strong></p><p>&nbsp;</p><ol><li><strong>Financial Feasibility and Model Development: </strong>Develop a comprehensive financial model aligned with the technical and commercial assumptions, emerging from the TACTIS feasibility work. The model shall include CAPEX, OPEX, lifecycle maintenance, depreciation, replacement cycles, projected revenues, cash flow performance, sensitivity tests, capital-call implications, and long-term sustainability. Coordinate with the technical team to ensure all input is consistent.</li><li><strong><strong>Commercial Structure Assessment &amp; Refinement: </strong></strong>Analyze and refine practical wholesale commercial structure options appropriate for a shared landing-party SPV. These options may include variations in pricing methodologies, cost-recovery mechanisms, revenue allocation rules, and capacity assignment principles. For each model, evaluate implications for:</li></ol><ul><li>affordability and competitiveness of international capacity;</li><li>long-term financial sustainability of the SPV;</li><li>incentives for private-sector investment;</li><li>governance arrangements and operational complexity;</li><li>compatibility with potential DFI financing.</li></ul><p>Support AC3 members in reviewing these options and facilitate consensus toward the preferred commercial structure. Once a model is agreed, translate it into the necessary financial assumptions and structuring parameters for the SPV.</p><ol><li><strong>Capital Structure &amp; Shareholding Design: </strong>Define capital requirements and develop a proposed capitalization structure for AC3-Liberia, including:</li></ol><ul><li>valuation of all shareholder contributions, including Government cash equity and potential in-kind contributions (e.g., rights-of-way, landing facilities, ducts, strategic assets);</li><li>design of shareholding arrangements consistent with majority private-sector ownership and minority Government participation;</li><li>capital-call mechanisms, tranche schedules, and pre-operational financing arrangements;</li><li>assessment of optional participation by external private investors or DFIs and implications for dilution or governance.</li></ul><ol><li><strong><strong>Assessment of External Investor Participation (Optional): </strong></strong>Where beneficial, undertake a targeted assessment of whether additional investors or DFIs should be invited to participate. Provide a recommendation to AC3 members on whether external participation adds commercial, operational, or financial value. If approved, proceed with the optional competitive process under Phase 3C.</li></ol><p>&nbsp;</p><p><strong>Phase 3 &ndash; SPV Incorporation, Corporate Structuring, and Legal-Commercial Alignment</strong></p><p>&nbsp;</p><ol><li><strong><strong>Preparation of Corporate Legal Instruments: </strong></strong>Prepare all legal&nbsp;instruments&nbsp;required for the establishment and operation of AC3-Liberia, ensuring including alignment with the selected commercial and capital structure. Documents include:&nbsp;the Articles of Incorporation, Bylaws, Shareholders&rsquo; Agreement, Subscription Agreements, Subscription Agreement, Corporate Governance Framework, Board Charter, and any additional founding instruments or annexes needed to ensure a coherent and legally sound SPV structure.</li><li><strong>Governance and Commercial Framework Design:</strong>&nbsp;Translate the preferred commercial structure into governance rules, shareholder rights and obligations, decision-making arrangements, participation conditions for operators, reporting requirements, dispute-resolution mechanisms, capital-call processes, and compliance obligations. Ensure consistency with Liberian law and international practice for shared international cable landing arrangements.</li><li><strong><strong>Alignment of Legal, Financial, and Commercial Structuring</strong></strong><strong><strong>: </strong></strong>Ensure full coherence between legal instruments, commercial terms, governance frameworks, financial model parameters, and capitalization designs. Conduct iterative joint reviews with AC3-Liberia members to harmonize assumptions and obligations across all documents.</li><li><strong><strong>Project Implementation Manual (PIM) for the SPV:</strong></strong>&nbsp;Prepare a draft PIM that serves as the operational handbook for AC3-Liberia, covering how the SPV will be governed, capitalized, and managed, and how it will carry out its responsibilities under the project. The PIM shall include the SPV&#39;s governance and decision-making structure, capitalization arrangements and equity contribution process, operational procedures, criteria and process for admitting private Licensed Telecommunications Operators as shareholders, and the legal and regulatory framework within which the SPV operates.</li><li><strong><strong>Optional Competitive Process for External Investors</strong></strong><strong><strong>: </strong></strong>If external participation is recommended and approved:</li></ol><ul><li>develop financial and commercial sections for Initial Selection (IS) and RFP documents;</li><li>support evaluation criteria and financial-compliance scoring;</li><li>review and advise on bidder submissions.</li></ul><p>No process will be launched unless explicitly requested by AC3-Liberia.</p><p>&nbsp;</p><p><strong>Phase </strong><strong>4</strong><strong>&nbsp;&ndash;Negotiation, </strong><strong>Document Finalization, </strong><strong>and Financial Close </strong><strong>Preparation</strong></p><p>&nbsp;</p><ol><li><strong>Negotiation Support:</strong>&nbsp;Support AC3-Liberia in negotiations with shareholders &ndash; and if applicable, external investors and DFIs. Review financing offers, term sheets, and investment commitments. Ensure all negotiated terms remain aligned with the SPV&rsquo;s financial model, capital structure, and governance structure.</li><li><strong>Finalization of Corporate, Commercial, and Legal Documentation:</strong>&nbsp;Revise legal and commercial documents to reflect negotiation outcomes and ensure consistency with the final commercial and capitalization structure. Confirm enforceability and completeness.</li><li><strong>Financial Close </strong><strong>Package </strong><strong>and </strong><strong>Roadmap</strong><strong>:</strong>&nbsp;Prepare the Financial Close Package, including the financing plan, capital structure narrative, valuation summaries (cash and in-kind contributions), commercial structure and risk allocation summary, supporting model outputs, required by financiers. Develop a roadmap and checklist for financial close and support AC3-Liberia in fulfilling conditions precedent, executing equity subscription steps, and completing capitalization processes.</li><li><strong><strong>Optional Interface Support with WARDIP Implementation</strong></strong><strong><strong>: </strong></strong>If requested, provide inputs on how AC3-Liberia&rsquo;s governance, reporting, and capitalization arrangements interface with WARDIP project implementation processes (e.g., sequencing of approvals, Government equity contributions, PIU coordination).</li></ol><p>&nbsp;</p><p><strong>Phase </strong><strong>5</strong><strong>&nbsp;&ndash; </strong><strong>Final Report and Handover</strong></p><p>&nbsp;</p><p>Prepare and submit a consolidated final report, including:</p><ul><li>Final legal documentation.</li><li>Financial model (editable with user guide)</li><li>Valuation assessments (cash and in-kind)</li><li>Commercial term sheets</li><li>Capital structure and financial close documents</li><li>Investor participation analysis&nbsp;(if applicable)</li><li>Operationalization roadmap for AC3-Liberia</li><li>Project Implementation Manual (PIM) for the SPV</li></ul><p>&nbsp;</p><p><strong><strong>4. DURATION, DELIVERABLES OF THE ASSIGNMENT, AND PAYMENT SCHEDULE&nbsp;</strong></strong></p><p>&nbsp;</p><p>The assignment is expected to last 12 months (365 days) or until financial close of AC3-Liberia, whichever occurs first.</p><p>Payments will be made upon acceptance of the following deliverables:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>Timeline</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>Deliverables</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>Payment (%)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 2 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Inception Report and Immediate Readiness Actions</strong></strong></p><ul><li>Inception report with methodology, work plan, and stakeholder engagement plan.</li><li>Rapid legal and institutional readiness assessment.</li><li>Review of existing technical/financial inputs (incl. TACTIS) and identification of gaps.</li><li>Preliminary mapping of SPV incorporation steps and responsibilities.</li><li>Initial risk register with mitigation measures.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 8 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Financial Feasibility, Commercial Structure Options, and Draft Capital Structure</strong></strong></p><ul><li>Draft multi-scenario financial model (CAPEX/OPEX/lifecycle/sensitivities)</li><li>Analysis and refinement of practical wholesale commercial structure options.</li><li>Draft capital structure and preliminary valuation of shareholder contributions (cash + potential in-kind).</li><li>Advisory note on potential role of external/DFI investors.</li><li>Interim structuring memo summarizing recommended direction.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 12 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Preferred Commercial Structure &amp; Validated Financial Model</strong></strong></p><ul><li>Finalization of preferred commercial structure after AC3 consultations.</li><li>Updated financial model reflecting agreed commercial assumptions.</li><li>Final recommended capital structure and draft shareholding distribution options.</li><li>Updated valuation note (cash and potential in-kind contributions).</li><li>Draft implications for Shareholders&rsquo; Agreement and Bylaws.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 16 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Full Draft Corporate Legal Documentation Package </strong></strong></p><ul><li>Draft Articles of Incorporation.</li><li>Draft Bylaws.</li><li>Draft Shareholders&rsquo; Agreement.</li><li>Draft Subscription Agreements.</li><li>Draft Corporate Governance Framework and Board Charter.</li><li>Draft procedures for capital calls, obligations, and dispute resolution.</li><li>Alignment note confirming consistency between commercial, financial, and legal structures.</li><li>Draft Project Implementation Manual (PIM) for the SPV</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 22 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Negotiation Support and Revised Legal &amp; Commercial Documents</strong></strong></p><ul><li>Support during negotiations with shareholders, DFIs, and potential investors.</li><li>Revised Shareholders&rsquo; Agreement, Bylaws, Subscription Agreements, and governance instruments reflecting negotiated terms.</li><li>Updated financial model outputs and capital structure narrative.\\</li><li>Advisory note on finalization steps, conditions precedent, and actions required for financial close.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 30 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Financial Close Package and Final Documentation</strong></strong></p><ul><li>Full Financial Close Package (financing plan, capitalization narrative, valuations, risk allocation, model outputs).</li><li>Checklist and roadmap for conditions precedent.</li><li>Finalized corporate documents ready for execution and filing.</li><li>Operationalization advisory note.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Commencement + 36 weeks</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong><strong>Final Report and Handover</strong></strong></p><ul><li>Consolidated Final Report (full advisory process + documentation).</li><li>Final editable financial model with user guide.</li><li>Final valuation assessments.</li><li>Final commercial structure note and capitalization approach.</li><li>Final Financial Close Package and roadmap.</li><li>Closing debrief / capacity support session.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>5%</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><strong>5. QUALIFICATIONS AND EXPERIENCE</strong></strong></p><p>&nbsp;</p><p>The selected firm must demonstrate the capacity to deliver both legal advisory and financial/transaction advisory services under a single contract, with proven experience in structuring and operationalizing infrastructure SPVs. Specifically, the firm must meet the following criteria:</p><ul><li>Registered law firm, financial advisory firm, or consortium (acting as a single contracting entity) with demonstrated ability to provide integrated legal, financial, and commercial advisory services.</li><li>Minimum of 10 years&rsquo; experience in infrastructure PPPs, corporate structuring, and project finance in emerging or developing markets.</li><li>Demonstrated expertise in telecommunications, ICT, digital infrastructure, or submarine cable/landing-station projects, including experience with shared infrastructure or wholesale access arrangements.</li><li>Experience advising Governments, DFIs, private operators, or regulators on the structuring of PPPs, SPVs, or infrastructure investment vehicles.</li><li>Proven track record in drafting and negotiating corporate legal documentation (e.g., Articles of Incorporation, Bylaws, Shareholders&rsquo; Agreements, Subscription Agreements, governance frameworks).</li><li>Proven capability in financial structuring, including capital structure design, valuation of cash and in-kind contributions, and preparation of transactions for DFI participation.</li><li>Demonstrated ability to build, maintain, and stress-test financial models for large-scale infrastructure SPVs, including multi-scenario and long-term sustainability analyses.</li><li>Strong understanding of Liberian commercial, company, and tax law, or ability to mobilize qualified Liberian legal expertise as part of the team.</li></ul><p>Experience working in West Africa or similar environments is an advantage.</p><p>Ability to deploy a multidisciplinary team fluent in English, available throughout the assignment.</p><p>&nbsp;</p><p><strong><strong>5.1 KEY EXPERTS</strong></strong></p><p>&nbsp;</p><p>The consulting firm shall provide the following key experts for the assignment:</p><ol><li><strong>Legal &amp; Transaction Expert as Team Leader</strong>: At least 15 years of experience in structuring PPPs, SPVs, and closing project-financed infrastructure transactions, with a strong track record in telecommunications, fiber-optic, or other digital infrastructure projects. Demonstrated ability to lead multidisciplinary teams, negotiate with private operators and DFIs, and oversee both legal and commercial workstreams. Experience in Africa or similar contexts is an advantage.</li><li><strong><strong>Senior </strong></strong><strong><strong>Legal Specialist</strong></strong><strong><strong>&nbsp;(Corporate &amp; Regulatory)</strong></strong>: At least&nbsp;10 years of experience in corporate and commercial law, including drafting Articles of Incorporation, Bylaws, Shareholders&rsquo; Agreements, Subscription Agreements, and corporate governance frameworks. Experience with telecommunications regulation or digital infrastructure licensing is preferred. Expertise in Liberian law may be provided through qualified national legal counsel within the team structure.</li><li><strong>Project Finance</strong><strong>&nbsp;Specialist</strong>: At least 10 years of experience in infrastructure project finance, capital structure design, valuation of cash and in-kind contributions, and preparation of transactions for DFI participation. Demonstrated experience advising on financing term sheets, investor negotiations, and financial close processes. Experience in telecommunications or digital infrastructure is preferred.</li><li><strong>Financial Model</strong><strong>ing Specialist</strong>: At least 5 years of experience in business and financial modeling for infrastructure SPVs or PPP projects. Proven ability to build multi-scenario models incorporating CAPEX, OPEX, demand projections, cost-recovery frameworks, capital-call structures, and long-term sustainability analysis. Experience with digital infrastructure or telecommunications is an advantage.</li><li><strong><strong>Corporate &amp; Governance Expert</strong></strong>&nbsp;&ndash; At least 7 years in designing and operationalizing governance structures for SPVs, joint ventures, or infrastructure consortia. Experience drafting governance frameworks, board charters, reporting protocols, and decision-making rules, and advising on operational readiness and shareholder interfaces.</li></ol><p>&nbsp;</p><p>The firm may propose additional non-key experts (e.g., Tax Advisor, Telecom Market Specialist, etc.) as needed to deliver the assignment. These will not be scored individually but will be considered in assessing the overall adequacy of the proposed team.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><strong>6. CONFIDENTIALITY </strong></strong></p><p>&nbsp;</p><p>By accepting to take part in the invitation, the Consultant agrees to keep in confidence all information shared by the Liberian government authorities and the World Bank, whether written or oral, concerning the invitation and/or in relation to the government organizations&rsquo; business involved in this assignment which is not of public domain. The Consultant also agrees to use it only for the purposes of this activity and for no other reasons and not to disclose any of the said information to any third party. &nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00464731","notice_type":"Request for Expression of Interest","noticedate":"25-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-07T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"St Maarten","project_id":"P179067","project_name":"SINT MAARTEN: WASTEWATER MANAGEMENT PROJECT","bid_reference_no":"SX-NRPB-569596-CS-INDV","bid_description":"Hydraulic Engineer","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Walter Nisbeth Road 57\nPhilipsburg, St, Maarten","contact_ctry_name":"St Maarten","contact_email":"jobopportunity@nrpbsxm.org","contact_name":"Alvaro Vadillo","contact_organization":"National Recovery Program Bureau","contact_phone_no":"+17215428887","contact_web_url":"https://nrpbsxm.org/","submission_date":"2026-08-25T00:00:00Z","notice_text":"<p>National Recovery Program Bureau</p><p>TERMS OF REFERENCE</p><p>For</p><p>Individual Consultant (20 months)</p><p>-Time based-</p><p>HYDRAULIC ENGINEER</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Following the devastation caused by hurricanes Irma and Maria in September 2017, the Government of Sint Maarten embarked on a large-scale recovery and reconstruction program, based on the principle of building back better.</p><p>Since January 2018, the World Bank is assisting the Government of Sint Maarten. A significant part of Sint Maarten&rsquo;s ongoing recovery and reconstruction program is financed through a Trust Fund financed by the Netherlands, managed by the World Bank, and implemented by Sint Maarten.</p><p>To support the implementation of the Trust Fund, the Government of Sint Maarten established the National Recovery Program Bureau (NRPB), which serves as the Project Implementation Unit (PIU) for the Government of Sint Maarten.</p><p><strong>Short Description of the Project</strong></p><p>The Wastewater Management Project (hereinafter referred to as &ldquo;the Project&rdquo;) implements a wide range of activities, in close collaboration with government counterparts and ministries, notably Ministry of Public Housing, Spatial Planning, Environment, and Infrastructure (hereinafter referred to as &ldquo;VROMI&rdquo;.</p><p>The project consists of the improvement of the coverage and performance of the wastewater system in Sint Maarten. This will be done through the expansion of the existing sewerage network to enable the connection for residents and commercial enterprises, the rehabilitation of critical parts of the existing sewage system to improve its climate resilience and operational efficiency and the improvement of the wastewater treatment plant.</p><p><strong>Role of the Engineer</strong></p><p>NRPB is seeking the services of an Engineer [hereinafter referred to as &ldquo;Consultant&rdquo;] to support the NRPB with technical expertise on all construction-related activities under the Wastewater Management Project and any other project that could utilize the specific expertise of the Engineer. The Engineer will assist the NRPB in the development of terms of references, technical drawings, bills of quantities, cost estimates, bidding documents etc. (S)he will monitor works on behalf of the project Manager (PM) and represent the NRPB in technical committee meetings and evaluations upon</p><p>SWAMP PM request. The Engineer shall report regularly on the progress of project implementation to the NRPB.</p><p><strong>Key Duties and Responsibilities</strong></p><p>The Engineer will be a full-time professional responsible for technical aspects of project execution and supervision and will support the NRPB with all matters concerning construction under the Project. Construction activities under the project include the installation of sewerage pipes, construction of manholes, connections to buildings and upgrade works in the wastewater treatment plant.</p><p>The Engineer&rsquo;s responsibilities will include:</p><p>1. Work within the NRPB on the implementation of the Project following the rules and regulations of the World Bank.</p><p>2. In coordination with NRPB Procurement, as well as line ministries/external agencies, manage and supervise the preparation of all required technical project documents including Terms of Reference (ToRs) for consultants and consulting firms, specifications, and designs for works.</p><p>3. Cooperate and coordinate with operational units of line ministries/agencies to develop technical terms of references, scope of works, bills of quantities and cost estimates.</p><p>4. Assist NRPB Procurement in the preparation of technical tender documents.</p><p>5. Identify all technical elements and documentation required to implement assigned project activities.</p><p>6. Represent the NRPB as the contracting officer&rsquo;s technical representative (COTR) during project execution and serve as the principal contact with consultants and contractors during project execution.</p><p>7. Represent the NRPB in technical bid evaluations during the contracting process.</p><p>8. Track activities&rsquo; progress, specifically to ensure timely conclusion of works.</p><p>9. Regularly monitor and report on project execution progress and budget performance.</p><p>10. Regularly liaise with the Project Manager, NRPB Procurement Officers, E&amp;S Officers, Legal Officers, and M&amp;E Specialist to ensure achievement of the program objectives, as well as ensure compliance with World Bank procedures.</p><p>11. Work directly with project counterparts and relevant stakeholders to ensure deliverables fall within the applicable scope and budget. This will involve coordinating with other departments within the Government as well as external counterparts, to ensure all aspects of each construction activity are compatible and to clarify specific requirements of each project.</p><p>12. Report periodically to the Project Manager on progress and challenges of ongoing construction activities.</p><p>13. Make suggestions that may improve his/her own job description or implementation, the overall implementation of SWaMP or the functioning of the NRPB.</p><p>14. Assist with any other project that could utilize the specific expertise of the Engineer.</p><p>15. Conduct any other ad hoc technical or contract management work as directed by the Project Managers.</p><p><strong>Contractual Arrangements.</strong></p><p>A time-based contract is expected to be signed. The start date of the contract will be October 2026 or soon thereafter. The contract&rsquo;s duration will be 20 months, until 30 June 2028. The successful candidate is expected to be based within Philipsburg, Sint Maarten. The Consultant is expected to perform the above-mentioned tasks on an ongoing basis during the term of his/her assignment, to the satisfaction of the Project Manager.</p><p>The consultant will report monthly to the Project Manager</p><p>The performance of the Consultant will be appraised by the Project Manager based on the timely implementation and execution of tasks described under the key responsibilities for the role.</p><p><strong>Qualification requirements</strong></p><p>Minimum Requirements</p><p>&middot; Master&rsquo;s degree in civil engineering, water or wastewater Engineering;</p><p>- With a Master&rsquo;s Degree: A minimum of 5 years of professional experience in the field of technical design, construction management and site supervision</p><p>Or: Bachelor&rsquo;s Degree in Civil Engineering, water or wastewater Engineering;</p><p>- With a Bachelor&rsquo;s Degree: A minimum of 7 years of professional experience in the field of technical design, construction management and site supervision;</p><p>&middot; Functionally computer literate, possessing operational skills in word-processing and spreadsheet software such as MS Word, MS Excel, MS PowerPoint and project management software such as MS Project;</p><p>&middot; Proven relevant experience in preparation of technical documentation, Terms of references, technical bidding documents and specifications.</p><p>&middot; Proven relevant experience of wastewater installations management and site supervision;</p><p>&middot; Proven relevant experience in managing external consultants and contractors;</p><p>&middot; Proven experience with the preparation of technical briefings and reports.</p><p>&middot; Fluency in English;</p><p>&middot; Ability to work with and coordinate other professionals in engineering activities;</p><p>&middot; Demonstrated ability to work in teams within a collaborative mode; develop and maintain effective work relationships with counterparts;</p><p>&middot; Ability to manage priorities and workflow within deadlines and work efficiently under pressure;</p><p>&middot; Time management and organizational skills with attention to detail;</p><p><strong>Preferred Experience</strong></p><p>&nbsp;</p><p>&middot; Experience in multidisciplinary, donor-funded projects.</p><p>&middot; Familiarity with World Bank procedures would be a significant advantage.</p><p>&middot; Proficiency in Dutch in speech and writing is an advantage.</p><p>&middot; Understanding the challenges faced by (Caribbean), Small Island Developing States (SIDS);</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Strategic Competencies &ndash; brief description</strong></p><p>&nbsp;</p><p>NRPB as an organization is committed not only to WHAT we must achieve but also on HOW we are going to reach our objectives. Therefore, for this position we are looking for a profile that displays the following competencies:</p><p>Professional Acumen - Intermediate Level</p><p>&middot; Applies problem-solving methodologies and tools to diagnose and solve operational and interpersonal problems;</p><p>&middot; Determines the potential causes of the problem and works on certain scenarios;</p><p>&middot; Sees opportunities and takes the initiative to act on them;</p><p>&middot; Understands that responsible use of resources maximizes our impact on our beneficiaries;</p><p>&middot; Open to change and flexible in a fast-paced environment;</p><p>&middot; Effectively adapts own approach to suit changing circumstances or requirements;</p><p>&middot; Evaluates data and courses of action to reach logical, pragmatic decisions;</p><p>&middot; Takes an unbiased, rational approach with calculated risks;</p><p>Looking at the bigger picture &ndash; Strategic outlook &ndash; Beginner Level</p><p>&middot; Aligns current work and activities with the NRPB&rsquo;s strategic goals;</p><p>&middot; Acts on and implements strategies and policies in accordance with the NRPB&rsquo;s strategic goals;</p><p>&middot; Comprehends operational and organizational goals and direction;</p><p><strong>Leading myself and the others &ndash; Intermediate Level</strong></p><p>&middot; Regularly provides constructive feedback and recognition to team members regarding job performance;</p><p>&middot; Collaborates and supports the development of others;</p><p>&middot; Shares own knowledge and best practices with others for the purpose of assisting in their ongoing development;</p><p><strong>Respect for diversity - Intermediate level</strong></p><p>&middot; Treats all individuals with respect;</p><p>&middot; Responds sensitively to differences and encourages others to do the same;</p><p>&middot; Shows flexibility in changing the styles when faced with multiple dimensions of culture to be effective across cultural contexts;</p><p>&middot; Understands multiple cultural frameworks, values, and norms;</p><p><strong>Successful Communication &ndash; Intermediate level</strong></p><p>&middot; Explains issues clearly and succinctly;</p><p>&middot; Writes clearly and succinctly in standard communication settings and styles;</p><p>&middot; Can clearly identify the subject and state the purpose of the communication;</p><p>&middot; Communicates with impact as well as with empathy;</p><p>&middot; Remains calm when dealing with conflicts; shows empathy;</p><p><strong>Relationship Building. Consultation and Collaboration &ndash; Intermediate level</strong></p><p>&middot; Shares information and readily determines to whom to go for relevant information;</p><p>&middot; Seeks assistance and feedback in the problem-solving process;</p><p>&middot; Fosters teamwork;</p><p>&middot; Initiate collaboration on projects or methods of operating;</p><p>&middot; Demonstrates understanding of the impact of own role on all partners and always puts the end beneficiary first;</p><p><strong>Courage and Integrity &ndash;Intermediate level</strong></p><p>&middot; Maintains general knowledge of ethics, laws, regulations, standards that may impact the organization</p><p>&middot; Reinforces difficult decisions that align with the organizational strategies and goals</p><p>&middot; Enforces policies consistently</p><p>&middot; Influences others to behave in an ethical manner</p><p>&middot; Takes immediate action regarding reports of unethical behaviors or conflict of interest</p><p><strong>How to Apply?</strong></p><p>&nbsp;</p><p>Interested consultants can send their CV in English by e-mail ONLY to<strong> jobopportunity@nrpbsxm.org.</strong></p><p></p><p>In the subject line, please state, &ldquo;Hydraulic Engineer &rdquo;. The CV should clearly present relevant experience to meet minimum requirements and preferred requirements, as outlined in this terms of reference.</p><p></p><p>Applicants should ensure that their CV is received before __________2026, at 17h00 AST. Any CVs received after this deadline may not be considered.</p><p></p><p>When applying, please consider the following requirements:</p><p></p><p>&middot; Upon selection for an interview, applicants will be requested to produce evidence of the educational and professional qualifications pertaining to the minimum requirements. References may be asked for.</p><p>&middot; Applicants may also be subject to satisfactory background checks.</p>"},{"id":"OP00459459","notice_type":"Request for Expression of Interest","noticedate":"19-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-28T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Marshall Islands","project_id":"P181250","project_name":"Renewable Energy Generation and Access Increase Project","bid_reference_no":"MH-MEC-563965-CS-CQS","bid_description":"Preparation of an Energy Sector Investment Program for the Marshall Islands","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"P.O. Box 1439\nMajuro, Marshall Is.\nMH 96960","contact_ctry_name":"Marshall Islands","contact_email":"jack.chonggum@mecrmi.net","contact_name":"Jack Chong-Gum","contact_organization":"Marshalls Energy Company","contact_phone_no":"(692)625 3828","contact_web_url":"meccorp@ntamar.net","submission_date":"2026-08-19T00:00:00Z","notice_text":"<p>Renewable Energy Generation and Access INcrease Project (REGAIN)</p><p>(P181250)<br />Marshall Islands</p><p>REQUEST FOR EXPRESSIONS</p><p>OF INTEREST<br />Consulting Services</p><p>For</p><p>Preparation of an Energy Sector<br />Investment Program (ESIP) for</p><p>the Marshall Islands</p><p>Grant No.: E331-MH<br />REGAIN Project<br />Reference No. MH-MEC-564965</p><p>July 31, 2026</p><p>The Government of the Republic of the Marshall Islands (GRMI) has received financing from the International<br />Development Association (IDA) (the &ldquo;Bank&rdquo;) in the form of a grant (hereinafter called &ldquo;the Grant&rdquo;), in the<br />amount of US$60 million, toward the cost of the Renewable Energy Generation and Access Increase (REGAIN)<br />Project (P181250), approved and effective as of December 13, 2024, with a closing date of September 30, 2030.<br />The Marshalls Energy Company (MEC), as Employer and implementing agency, intends to apply a portion of<br />the proceeds of the Grant to eligible payments under a contract for consulting services for the preparation of an<br />Energy Sector Investment Program (ESIP), under Sub-Component 3.1 (Sector Development Assistance) of the<br />REGAIN Project. The ESIP shall be prepared in close coordination with the newly established National Energy<br />Authority (NEA) and shall cover Majuro, Ebeye and the outer island systems.<br />The consulting services (&ldquo;the Services&rdquo;) comprise the preparation of a prioritized, costed, and financeable<br />Energy Sector Investment Programme (ESIP) for the Marshall Islands, aligned with the Government&#39;s existing<br />Energy Strategy and Integrated Resource and Resilience Plan (IRRP). The Services include, among others:<br />&bull; Targeted sector diagnostics and strategic review;<br />&bull; Review and update of the least-cost development pathway, including preparation of an updated and<br />integrated IRRP covering Majuro, Ebeye, and Outer Islands;<br />&bull; Preparation and update of the energy sector investment pipeline;<br />&bull; Renewable energy and storage target refinement;<br />&bull; Preparation of a financing strategy;<br />&bull; Preparation of a policy reform and enabling actions roadmap;<br />&bull; Preparation of an e-mobility investment and strategic framework;<br />&bull; Design of the ESIP monitoring and implementation framework;<br />&bull; Stakeholder engagement, consultations and results validation; and<br />&bull; Outer-island mini-grid (and, where suitable, mesh-grid) concept design.<br />The assignment is structured as a lump-sum contract with an estimated duration of 12 months, with an expected<br />start date in September 2026. The selected firm will nominate a multidisciplinary team, including the Key<br />Experts described below, and will report to MEC, coordinating closely with NEA, the World Bank, ADB and<br />other relevant stakeholders.<br />The Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.<br />MEC now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services.<br />Interested Consultants should provide information demonstrating that they have the required qualifications and<br />relevant experience to perform the Services.<br />The shortlisting criteria are:<br />Mandatory requirements<br />a) Firm Experience:<br />1. At least 10 years of experience in energy sector planning, energy investment planning, integrated<br />resource planning, sector development strategies, or related advisory services.</p><p>2. Successful completion of at least two similar assignments during the last ten years involving energy<br />sector investment programs, integrated resource planning, utility master planning, energy transition<br />roadmaps, or comparable strategic energy planning studies.<br />3. Demonstrated experience working in developing countries, Small Island Developing States (SIDS), or<br />geographically dispersed island power systems.<br />4. Technical and managerial capacity to undertake multidisciplinary energy sector assignments.<br />The Consultant shall demonstrate availability of qualified experts in energy sector planning, power system<br />planning, finance, policy and stakeholder engagement. Key Experts will not be evaluated at the shortlisting<br />stage.<br />Discretionary requirements<br />1. The Firm&rsquo;s ability to satisfy many or all of the following points are also considered relevant to a<br />successful application<br />o Proven ability to work effectively and sensitively in multi-cultural environments and build<br />effective business relationships with clients and colleagues.<br />o Experience of undertaking projects in a small developing state or a small island state or<br />municipality.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World<br />Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;), setting<br />forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to the following specific information<br />on conflict of interest related to this assignment:<br />Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the<br />association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners<br />in the joint venture shall be jointly and severally liable for the entire contract, if selected.<br />A Consultant will be selected in accordance with the Selection based on Consultant&rsquo;s Qualifications (CQS)<br />method set out in the World Bank Regulations for IPF-Borrowers September 2025<br />Further information can be obtained at the address below during office hours. 0900 to 1700 hours.</p><p>MEC:<br />Attn: Steve Wakefield<br />PO Box 1439<br />Majuro MH 96960<br />Republic of the Marshall Islands<br />Tel: 692-625-3827/3829<br />E-mail: swakefield@mecrmi.com<br />Copy: Jack Chong-Gum, jack.chonggum@mecrmi.net<br />EOI Submission Requirements:<br />Expressions of Interest should include the following information:<br />1. Firm profile<br />Expressions of Interest EOI must be delivered in a written form to the address below August 28th, 2026.</p><p>2. Organizational Capacity<br />3. Relevant assignments (maximum 10 projects) preferably including energy sector planning or similar<br />assignments in developing countries or small island states.<br />4. Confirmation of mandatory requirements<br />5. Company registration documents<br />Page Limit: Maximum 15 pages excluding registration documents.</p><p>Yours sincerely,</p><p>Jack Chong-Gum<br />CEO<br />Marshalls Energy Company<br />P O Box 1439, Majuro MH 96960<br />jack.chonggum@mecrmi.net</p><p>Republic of the Marshall Islands<br />Marshalls Energy Company (MEC)<br />Terms of Reference (TOR)</p><p>Preparation of an Energy Sector Investment Program for the Marshall Islands &ndash; REGAIN</p><p>Project</p><p>Project ID: P181250<br />Assignment Type: International Firm (Lump sum Contract)<br />Duration: 12 Months<br />Location: Remote with Periodic Missions to Majuro<br />1. Background<br />The Republic of the Marshall Islands (RMI) is one of the world&#39;s smallest and most isolated nations. The country<br />consists of 29 atolls and 5 low coral islands situated on about 181 square kilometres (km2) of land mass in the<br />Pacific Ocean. Majuro (the nation&#39;s capital) and Ebeye, the country&#39;s two largest urban centres, account for about<br />96 percent of total population while the remaining inhabit outer atolls. The Government of the Republic of<br />Marshall Islands, (GRMI) and MEC require assistance to increase the amount of renewable energy generation<br />and BESS in the selected islands to increase access to electricity and to reduce dependence on hydrocarbon fuels<br />for their remote populations.<br />MEC, the state-owned energy utility, generates and provides electricity to Majuro Atoll, serving 55 percent of<br />RMI&#39;s population. MEC also manages three mini grids in Jaluit, Wotje, Rongrong (Majuro Atoll) and Kili Island,<br />the latter having been recently transferred to MEC from the Kili Bikini Ejit Local Government. The Government<br />has partnered with the World Bank through the Renewable Energy Generation and Access Increase Project<br />(REGAIN) &ndash; an IDA grant of US$60 million approved and effective as of December 13, 2024, with a closing<br />date of September 30, 2030. The REGAIN project aims to increase renewable energy generation and improve<br />electricity access while reducing reliance on diesel-based generation.<br />RMI&rsquo;s Electricity Roadmap targets an objective of net zero greenhouse gas emissions and the achievement of<br />100% renewable electricity in the power generation mix by 2050. As a small and geographically dispersed island<br />nation, RMI remains highly dependent on imported diesel for electricity generation, which exposes the country<br />to high energy costs and vulnerability to global fuel price shocks. At the same time, growing electricity demand,<br />the need to improve the reliability of aging infrastructure, and the expansion of services across outer islands</p><p>require significant levels of investment in modern, resilient energy systems. Ensuring a reliable, clean, and cost-<br />effective electricity supply is therefore critical to achieving national climate commitments, strengthening energy</p><p>security, and supporting sustainable socio-economic development.<br />Under Sub-Component 3.1 of the REGAIN project (Sector Development Assistance), MEC plans to undertake a<br />study to prepare the country&rsquo;s Energy Sector Investment Program (ESIP). The ESIP shall propose and define a<br />set of detailed, prioritized energy investments to safely and reliably increase renewable energy penetration in<br />Majuro and Ebeye grids, as well as other outer islands. The ESIP shall be prepared in close coordination with the</p><p>newly established National Energy Authority (NEA), and shall cover the national footprint of RMI, including<br />Majuro, Ebeye and the outer island systems.<br />The ESIP shall take into account the full range of relevant existing studies, including but not limited to:<br />&bull; The Integrated Resource and Resilience Plan 2024-2034, which already sets out a high-level power system<br />assessment and identifies a set of proposed investments in Majuro.<br />&bull; SEDeP and REGAIN projects, including existing and new solar PV and Battery Energy Storage Systems<br />(BESS) capacity to be deployed.<br />&bull; Relevant energy sector programs and studies of other development partners active in the RMI, in particular<br />the Asian Development Bank (ADB), such as the Energy Transition Project, to be considered to ensure<br />coordination and avoid duplication of efforts.<br />&bull; RMI Electricity Roadmaps and national targets.<br />2. Objectives<br />The objective of this assignment is to prepare a prioritized, costed, and financeable Energy Sector Investment<br />Programme (ESIP) which is aligned with the existing Energy Strategy and Integrated Resource and Resilience<br />Plan (IRRP). The ESIP will build upon existing planning and strategy documents and will focus on updating,<br />operationalizing, and translating these into an actionable investment and implementation framework.<br />The ESIP should include:<br />&bull; The identification of investment priorities, including both generation and power grids.<br />&bull; Descriptions of viable approaches to financing the identified needed investments.<br />&bull; The enabling actions, including policy options to support the investment program.<br />&bull; The necessary implementation arrangements required to support delivery of national energy sector<br />objectives.<br />3. Project Description<br />The proposed ESIP project will support the development of a prioritized, costed, and implementable investment<br />program for the Marshall Islands&rsquo; energy sector, aligned with the Government&rsquo;s existing Energy Strategy and<br />considering the Integrated Resource and Resilience Plan (IRRP) for Majuro (prepared in 2024). Building on these<br />existing strategic and planning instruments, as well as an updated IRRP1</p><p>covering Majuro, Ebeye and the outer<br />island systems, the ESIP will translate national energy objectives into an actionable pipeline of investments and</p><p>enabling measures required to support sector development, energy security, resilience, decarbonization, and long-<br />term sustainability. The project will consolidate and update existing and official sector analyses and investment</p><p>priorities, while identifying financing approaches, implementation arrangements, and policy actions necessary to<br />facilitate delivery of priority investments.<br />The ESIP will include targeted sector diagnostics, a review and validation of the existing least-cost development<br />pathway, refinement of renewable energy and storage deployment trajectories, and the preparation of an updated<br />1 The updated IRRP Will be prepared as part of the present technical assistance and will include updating the existing (2024) IRRP for<br />Majuro and expanding the geographical coverage of the IRRP to also include Ebeye and the outer island systems.</p><p>energy sector investment pipeline. The project will also assess investment requirements associated with emerging<br />priorities such as grid modernization, resilience, storage integration, and e-mobility development. In parallel, the<br />ESIP will develop an overall financing strategy identifying potential public, private, concessional, and climate<br />finance sources, together with a policy reform and enabling actions roadmap aimed at addressing barriers to<br />implementation and investment mobilization.<br />The project will further establish an implementation and monitoring framework to support effective delivery and<br />tracking of the ESIP over time. Stakeholder engagement and consultation will be undertaken within the<br />assignment to ensure alignment across government institutions, utilities, development partners, and other relevant<br />stakeholders.<br />The resulting ESIP will provide a practical action plan for sequencing and financing priority energy sector<br />investments and will serve as a key tool for guiding government decision-making, coordinating development<br />partner support, and mobilizing investment into the sector.<br />4. Implementation Arrangements<br />MEC will be the Client and Employer under this assignment responsible for approving deliverables and payments.<br />NEA, as the national regulatory body for renewable energy in the Marshall Islands, will act as the principal<br />regulatory interface between MEC and the Consultant. For deliverables with regulatory or renewable energy<br />policy implications, the Consultant shall obtain NEA&#39;s endorsement prior to MEC&#39;s final approval. The Consultant<br />shall work under the direction of MEC and coordinate closely with:<br />&bull; MEC management and technical staff.<br />&bull; REGAIN Project Management Services consultant, as applicable.<br />&bull; Project Implementation Unit within MEC.<br />&bull; National Energy Authority (NEA), the national regulatory body for renewable energy, serving as the<br />regulatory interface between MEC and the Consultant.<br />&bull; World Bank on matters requiring no-objection, reporting, or implementation support.<br />&bull; ADB and other development partners active in RMI&#39;s energy sector, as relevant.<br />5. Scope of Services<br />Task 1. Targeted sector diagnostics and strategic review<br />The Consultant will undertake a focused review of the energy sector to validate key assumptions, identify material<br />developments since preparation of the IRRP and Energy Strategy, and assess investment-relevant constraints and<br />opportunities. This is a diagnostic update, as opposed to a full sector assessment.<br />Specifically, the Consultant will:<br />(i) Review of existing sector policies, strategies, and plans.<br />(ii) Review of recent sector developments and pipeline projects.<br />(iii)Assessment of institutional, financial, and implementation constraints.<br />(iv)Review of utility performance and sector financing context.<br />(v) Identification of critical sector gaps affecting investment delivery.</p><p>(vi)Validation of key demand, technology, and resilience assumptions relevant to the ESIP.<br />Task 2. Review and update of the least-cost development pathway.<br />The Consultant will review the existing least-cost development pathway established under the existing IRRP<br />(2024) for Majuro and undertake targeted updates where necessary to ensure continued relevance for investment<br />planning purposes. The Consultant will also expand the geographic focus, to also cover Ebeye and Outer Islands,<br />incorporating the results the existing IRRP update and the analyses of the Ebeye and Outer Islands into a single<br />and integrated IRRP covering the entire geographic extent of the Marshall Islands (i.e., Majuro, Ebeye, and Outer<br />Islands).<br />The key steps to be implemented include:<br />(i) The review of the underlying assumptions (especially the demand forecast, and renewable potential) used<br />in the existing IRRP for Majuro. Preparation of underlying assumptions to be used in the expanded and<br />integrated IRRP, covering Majuro, Ebeye and Outer Islands.<br />(ii) Assessment of prevailing conditions, and any material changes, affecting the least-cost pathway,<br />including:<br />a. Demand projections.<br />b. Fuel prices.<br />c. Technology potential and costs.<br />d. Resilience considerations.<br />e. Renewable integration requirements, including storage deployment needs.<br />f. Policy or regulatory developments.<br />(iii)Realization of high-level modelling and analytical updates, as required.<br />(iv)Confirmation of priority development trajectories for generation, storage, transmission, and distribution<br />investments in the Marshall Islands (covering Majuro, Ebeye, and Outer Islands).<br />(v) Preparation of the integrated and updated Marshall Islands IRRP document.<br />Task 3. Preparation and update of the energy sector investment pipeline<br />The Consultant shall develop a consolidated, prioritized, and sequenced pipeline of energy sector investments.<br />The Consultant will undertake the following:<br />(i) Consolidation of existing project pipelines and studies.<br />(ii) Update of investment requirements identified in the updated IRRP prepared under Task 2 and covering<br />the full geographic extent of the Marshall Islands, and related studies.<br />(iii)Identification of additional investment needs where gaps are identified.<br />(iv)Categorization of investments by subsector and implementation timeframe.<br />(v) Preliminary costing and sequencing of investments.<br />(vi)Identification of priority and near-term investments.<br />(vii) Development of an implementation-oriented investment pipeline, including both generation and<br />power grid infrastructure.</p><p>It is suggested that the following investment categories be used to group investments by type: renewable energy;<br />storage; transmission; distribution; resilience investments; grid modernization; energy Access; energy efficiency;<br />and e-mobility infrastructure.</p><p>Task 4. Renewable energy and storage target refinement<br />This phase is designed to support the operationalization of national renewable energy and storage ambitions<br />within the ESIP framework.<br />The Consultant shall undertake the following:<br />(i) Review of existing renewable energy and storage targets.<br />(ii) Assessment of the degree of consistency between targets, investment requirements, and implementation<br />capacity.<br />(iii)Refinement of indicative deployment trajectories where required.<br />(iv)Identification of enabling investments needed to support achievement of targets.<br />(v) Assessment of the implications for grid infrastructure and flexibility requirements.<br />It is important to note that the ESIP supports refinement and operationalization of existing targets rather than<br />formulation of entirely new national policy targets unless specifically directed.<br />Task 5. Preparation of the financing strategy<br />Under this phase, a comprehensive financing approach for implementation of the ESIP will be developed.<br />The Consultant will undertake the following:<br />(i) Estimation of financing requirements by subsector and timeframe.<br />(ii) Assessment of the public and private financing opportunities.<br />(iii)Identification of potential development partner and climate finance sources.<br />(iv)Assessment of opportunities for private sector participation and PPP models.<br />(v) Identification of financing gaps and constraints.<br />(vi)Development of recommendations for investment mobilization and project preparation.<br />The Consultant is expected to consider possible financing from the Marshall Islands&rsquo; public Budget; IFIs and<br />MDBs; climate finance; green finance instruments; IPPs/PPP structures; and commercial finance sources.<br />Task 6. Preparation of the policy reform and enabling actions roadmap<br />The aim of this phase is to identify priority policy, regulatory, institutional, and implementation measures required<br />to support delivery of the ESIP in practice in the Marshall Islands.<br />The Consultant will undertake the following activities:<br />(i) Identification of barriers affecting implementation of priority investments.<br />(ii) Review of the investment-related policy and regulatory gaps.<br />(iii)Assessment of permitting, procurement, and institutional coordination challenges.<br />(iv)Identification of utility and institutional capacity needs.<br />(v) Development of a phased roadmap of enabling actions and reforms.<br />Task 7. Preparation of the E-Mobility investment and strategic framework<br />This phase involves the assessment of implications of e-mobility development for the energy sector of the<br />Marshall Islands and identifies the associated investment and implementation requirements.</p><p>The Consultant will undertake the following:<br />(i) Review of the existing transport and e-mobility policies and initiatives.<br />(ii) Assessment of the expected electricity demand implications of e-mobility uptake.<br />(iii)Identification of charging infrastructure investment requirements.<br />(iv)Assessment of the main grid and distribution system implications.<br />(v) Identification of priority implementation actions and enabling measures.<br />(vi)Development of a high-level e-mobility framework aligned with the ESIP.<br />It is important to note that this framework is a targeted strategic and investment assessment linked specifically to<br />the Marshall Islands&rsquo; energy sector, not a standalone national transport strategy.<br />Task 8. Design of the ESIP monitoring and implementation framework<br />This phase comprises the development of a framework for monitoring implementation progress and investment<br />delivery.<br />The Consultant will undertake the following activities:<br />(i) Definition of the implementation monitoring indicators.<br />(ii) Development of reporting and governance arrangements.<br />(iii)Identification of institutional responsibilities.<br />(iv)Establishment of investment tracking mechanisms.<br />(v) Development of implementation milestones and review mechanisms.<br />(vi)Preparation of proposals on periodic ESIP update procedures.<br />It is anticipated that the monitoring and implementation framework will focus on the following key areas (and<br />others, as appropriate): investment delivery; financing mobilization; renewable deployment; grid expansion;<br />storage integration; e-mobility rollout; and resilience implementation.<br />Task 9. Stakeholder engagement, consultations and results validation<br />The Consultant will consult with and validate key assumptions and contents of the prepared ESIP with key<br />stakeholders, as appropriate, and to ensure alignment, ownership, and validation of the ESIP.<br />The Consultant will undertake the following activities:<br />(i) Planning and moderation of a stakeholder workshop to present the overall project outputs.<br />(ii) Realization of technical consultations as required, and consultations with MEC and the Marshall Islands<br />government.<br />(iii)Validation of prioritization and financing assumptions<br />Task 10. Outer-island mini-grid concept design</p><p>This phase responds to the need to improve electricity supply on selected outer islands by developing concept-<br />level designs for island mini-grids (and, where technically suitable, mesh-grid configurations). The concept</p><p>designs will inform and feed directly into the integrated IRRP (Task 2) and the energy sector investment pipeline<br />(Task 3).<br />The Consultant will undertake the following activities:</p><p>(i) Screening and prioritization of outer islands for mini-grid / mesh-grid intervention, based on<br />agreed technical, demand, and socio-economic criteria.</p><p>(ii) Assessment of existing electricity supply, demand profiles, and renewable resource potential (in<br />particular solar and storage) for the selected islands.<br />(iii)Development of concept-level system configurations, including indicative generation, storage, and<br />distribution sizing, and consideration of mini-grid versus mesh-grid architectures.<br />(iv)Preliminary technical design and equipment specifications sufficient to support investment<br />costing.<br />(v) Indicative capital and operating cost estimates and implementation sequencing for each prioritized<br />island.<br />(vi)Integration of the resulting concept designs and associated investment needs into the integrated<br />IRRP and the ESIP investment pipeline.</p><p>It is important to note that this task provides concept-level design to inform investment prioritization and costing,<br />and does not extend to detailed engineering design or tender-ready documentation, which would be undertaken<br />under subsequent project preparation.<br />6. Qualifications, Tasks, and Level of Effort of Specified Key Experts<br />The Consultant shall propose a team adequate for the assignment. In its proposal, the Consultant shall specify:<br />&bull; Each proposed key personnel position;<br />&bull; The name of the proposed expert, where available;<br />&bull; Role and responsibilities;<br />&bull; Minimum and actual qualifications and detailed relevant experience;<br />&bull; Whether the input is international or national / local;<br />&bull; Whether the input is home office or field-based;<br />&bull; Estimated level of effort in person-days or person-months; and<br />&bull; Anticipated timing of deployment and deployment location(s).<br />At a minimum, the Consultant is expected to consider inclusion of expertise and an indicative level of effort and<br />split of on-site and remote deployment, as follows:</p><p>Expert<br />Position</p><p>Key Tasks /<br />Responsibilities</p><p>Minimum Qualifications /<br />Experience</p><p>Int&rsquo;l / Nat&rsquo;l</p><p>Team Leader<br />/ Senior<br />Energy<br />Sector<br />Specialist</p><p>Overall project<br />management and project<br />coordination; lead<br />stakeholder engagement<br />and consultations.<br />Provision of strategic<br />oversight across all<br />workstreams; ensure<br />alignment with the Energy<br />Strategy and IRRP;<br />oversee preparation of all<br />draft and final<br />deliverables; coordinate<br />quality assurance and<br />reporting to the client.</p><p>Advanced degree in<br />energy, engineering,<br />economics, public policy,<br />or related field.<br />10 years of relevant<br />experience in energy sector<br />planning, investment<br />planning, or sector reform.<br />Demonstrated experience</p><p>leading similar national-<br />level energy sector</p><p>assignments.<br />Strong stakeholder</p><p>coordination and report-<br />writing experience.</p><p>International</p><p>Power<br />System<br />Planning and<br />Renewable<br />Energy<br />Specialist</p><p>Review and validate the<br />least-cost development<br />pathway and investment<br />assumptions. Assess<br />renewable energy and<br />storage deployment<br />requirements; Support<br />investment pipeline<br />development and<br />sequencing; Assess<br />transmission, distribution,<br />resilience, and grid<br />integration requirements.</p><p>Support assessment of e-<br />mobility impacts on the</p><p>power system.</p><p>Advanced degree in<br />electrical engineering,<br />energy systems, or related</p><p>field.<br />At least 8 years of<br />experience in power<br />system planning,<br />renewable energy<br />integration,<br />transmission/distribution<br />planning, or energy<br />modelling.<br />Experience of national or<br />utility-scale planning<br />studies is preferred.</p><p>International</p><p>Energy<br />Finance and<br />Investment<br />Specialist</p><p>Lead the development of<br />the financing strategy;<br />assess investment costs<br />and financing<br />requirements.<br />Identify public and private<br />financing options, climate<br />finance opportunities, and<br />PPP/IPP structures.<br />Support investment<br />prioritization and<br />affordability assessment<br />and investment<br />mobilization<br />recommendations.</p><p>Advanced degree in<br />finance, economics,<br />business, or related field.<br />At least 8 years of<br />experience in infrastructure<br />finance, energy sector<br />investment planning,<br />project finance, or climate<br />finance.<br />Experience working with<br />development finance<br />institutions and private<br />sector financing structures<br />is advantageous.</p><p>International</p><p>Policy,<br />Regulatory<br />and<br />Institutional<br />Specialist</p><p>Assess policy, regulatory,<br />and institutional barriers<br />affecting implementation<br />of priority investments.<br />Support preparation of the<br />enabling actions and<br />policy reform roadmap.<br />Assess institutional<br />coordination and<br />implementation<br />arrangements.<br />Support the development<br />of the monitoring and<br />implementation<br />framework.<br />Contribute to stakeholder<br />engagement activities.</p><p>Advanced degree in law,<br />public policy, economics,<br />energy policy, or related<br />field.<br />At least 8 years of<br />experience in energy sector<br />policy, regulation,<br />institutional reform, or<br />utility governance.<br />Experience supporting<br />implementation-focused<br />energy sector programs<br />preferred.</p><p>International</p><p>Local Energy<br />Sector /</p><p>Support local stakeholder<br />coordination, data</p><p>Relevant degree in energy,<br />engineering, economics,</p><p>National</p><p>Stakeholder<br />Engagement<br />Specialist</p><p>collection, institutional<br />engagement, workshop<br />organization, and review<br />of local sector context.<br />Facilitation of<br />coordination with<br />government agencies,<br />utilities, and local<br />stakeholders. Support in<br />project logistics and<br />consultation activities.</p><p>public administration, or<br />related field.<br />Minimum 5 years of local<br />sector experience.<br />Strong knowledge of the<br />Marshall Islands&rsquo; energy<br />sector institutions, policies,<br />and stakeholder<br />environment.<br />Fluency in English and<br />Marshallese is desirable.</p><p>7. Fees and Reimbursable Expenses<br />As this engagement will be structured as a lump-sum contract, the Consultant shall submit a financial proposal<br />(in addition to a technical proposal) that includes:<br />&bull; A total lump-sum price for the performance of the services, payable against the deliverables set out in<br />Section VIII, supported by a breakdown of professional fees by each proposed expert and personnel<br />category, indicating the applicable unit rates and estimated level of effort (person-months or person-days),<br />provided for information purposes; and<br />&bull; Reimbursable expenses, included within the lump-sum price, covering any anticipated travel,<br />accommodation, per diem, logistics, communications, and other project-related costs necessary for the<br />performance of the services.<br />The lump-sum price shall be inclusive of all costs necessary for the performance of the services. The Consultant<br />shall clearly state the assumptions underlying the proposed costs and provide sufficient detail to allow MEC to<br />assess the reasonableness of the proposed budget.<br />8. Deliverables<br />The project has six (6) main deliverables, as follows:<br />1. Inception report. This deliverable will include confirmation of the project methodology, workplan,<br />stakeholder engagement approach, data requirements, consultation schedule, and detailed approach for<br />preparation of the ESIP. An Inception workshop will be conducted with MEC and other relevant stakeholders<br />within 2 weeks from the Notice to Proceed to discuss the proposed program of activities and to seek feedback on<br />improvements, which will be reflected in the inception report.<br />2. Sector assessment and planning review report. This will be a consolidated report covering: (i) targeted sector<br />diagnostics; (ii) the results of the review and validation/update of the least-cost development pathway; (iii)<br />assessment of renewable energy and storage deployment trajectories; and (iv) the assessment of e-mobility<br />implications and associated investment needs.<br />3. Updated and integrated IRRP. This IRRP document will cover the full geographic extent of the Marshall<br />Islands. It will include all relevant updates to the existing 2024 IRRP on Majuro, as well as Ebeye and Outer<br />Islands. It will be an integrated and fully updated document. (The document may be prepared directly editing the<br />existing (2024) IRRP document in MS Word version, with all revisions and additions shown in track change<br />format).</p><p>4. Draft investment pipeline and financing strategy report. This report will cover the updated and prioritized<br />investment pipeline; and the investment sequencing and indicative costing. Furthermore, the report will set out<br />the proposed financing strategy and investment mobilization approaches; and the policy reform and enabling<br />actions roadmap. It will also present the outer-island mini-grid and mesh-grid concept designs and their<br />integration into the investment pipeline (Task 10).<br />5. Draft Energy Sector Investment Programme (Draft ESIP). This will be an integrated draft ESIP<br />consolidating all technical analyses, investment priorities, financing approaches, implementation arrangements,<br />the implementation monitoring framework, and stakeholder consultation outcomes for review and validation.<br />6. Final Energy Sector Investment Programme (Final ESIP). Final ESIP incorporating key stakeholder<br />comments. It will include the finalized investment pipeline, financing strategy, implementation roadmap, the<br />implementation monitoring framework, executive summary, and supporting annexes and presentation materials.<br />9. Contract Duration<br />The contract duration is 12 months. The expected start date is estimated to be in September 2026.</p>"},{"id":"OP00463607","notice_type":"Invitation for Bids","noticedate":"19-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-23T00:00:00Z","submission_deadline_time":"11:00","project_ctry_name":"Eswatini","project_id":"P508960","project_name":"Accelerating Sustainable and Clean Energy Access Transformation in Eswatini","bid_reference_no":"SZ-ECC-561950-CW-RFB","bid_description":"Design, Supply and Installation of 11kV Auto Reclosers (Plant)","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"P.O. 258 , Eluvatsini  House, Mhlambanyatsi Road\nH100, Mbabane\nEswatini","contact_ctry_name":"Eswatini","contact_email":"thobeka.gama@eec.co.sz","contact_name":"Thobeka Gama","contact_organization":"Eswatini Electricity Company","contact_phone_no":"26878332239","submission_date":"2026-08-19T00:00:00Z","notice_text":"<p><strong>Request</strong><strong> for </strong><strong>Bids</strong></p><p><strong>Plant</strong></p><p><br /><strong>Design, Supply, and Installation</strong></p><p><strong>Two-envelope with Rated Criteria</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong><strong>RFB No: </strong><em>SZ-ECC-561950-CW-RFB</em></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><strong>&nbsp;March 2025</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Request for Bids</strong></p><p><strong>Eswatini Electricity Company</strong></p><p>&nbsp;</p><p><strong>Procurement of </strong></p><p><strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></strong><strong><em> </em></strong></p><p><strong>For the </strong></p><p><strong>Accelerating Sustainable and Clean Energy Access Transformation in Eswatini</strong></p><p><strong>Project ID No: P508960</strong></p><p><strong>Employer</strong><strong>: </strong><em>Eswatini Electricity Company</em></p><p><strong>Project:<em> </em></strong><em>Accelerating Sustainable and Clean Energy Access Transformation - Eswatini</em></p><p><strong>Contract title</strong><strong>: </strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></p><p><strong>Country: </strong><em>Kingdom of Eswatini</em></p><p><strong>Loan No. /Credit No. / Grant No.:</strong><em> 7700-SZ</em></p><p><strong>RFB No: </strong><em>SZ-ECC-561950-CW-RFB</em></p><p><strong>Issued on: </strong><em>19 August 2026</em></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Standard Procurement Document</strong></p><p>&nbsp;</p><p><strong>Table of Contents</strong></p><p>&nbsp;</p><p><strong>PART 1 &ndash; Bidding Procedures. 3</strong></p><p>Section I - Instructions to Bidders. 5</p><p>Section II - Bid Data Sheet 39</p><p>Section III - Evaluation and Qualification Criteria (After prequalification) 49</p><p>Section III - Evaluation and Qualification Criteria (Without prequalification) 59</p><p>Section IV - Bidding Forms. 77</p><p>Section V - Eligible Countries. 151</p><p>Section VI - Fraud and Corruption. 153</p><p><strong>PART 2 - Employer&rsquo;s Requirements. 157</strong></p><p>Section VII - Employer&rsquo;s Requirements. 159</p><p><strong>PART 3 &ndash; Conditions of Contract and Contract Forms. 189</strong></p><p>Section VIII - General Conditions of Contract 191</p><p>Section IX - Particular Conditions of Contract 291</p><p>Section X - Contract Forms. 297</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>PART 1 &ndash; Bidding Procedures</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section I - Instructions to Bidders</strong></p><p>&nbsp;</p><p><strong>Contents</strong></p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General 8</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Bid. 8</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Source of Funds. 9</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fraud and Corruption. 9</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Eligible Bidders. 9</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Eligible Plant and Installation Services. 12</p><p><strong>B.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contents of Bidding Document 12</strong></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sections of&nbsp; Bidding Document 12</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Clarification of Bidding Document, Site Visit, Pre-Bid Meeting. 13</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Amendment of Bidding Document 15</p><p><strong>C.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preparation of Bids. 15</strong></p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cost of Bidding. 15</p><p>10.&nbsp;&nbsp;&nbsp; Language of Bid. 15</p><p>11.&nbsp;&nbsp;&nbsp; Documents Comprising the Bid. 15</p><p>12.&nbsp;&nbsp;&nbsp; Letters of Bid and Price Schedules. 17</p><p>13.&nbsp;&nbsp;&nbsp; Alternative Bids. 17</p><p>14.&nbsp;&nbsp;&nbsp; Documents Establishing the Eligibility of the Plant and Installation Services. 17</p><p>15.&nbsp;&nbsp;&nbsp; Documents Establishing the Eligibility and Qualifications of the Bidder 17</p><p>16.&nbsp;&nbsp;&nbsp; Documents Establishing the Conformity of the Plant and&nbsp; Installation Services. 18</p><p>17.&nbsp;&nbsp;&nbsp; Bid Prices and Discounts. 18</p><p>18.&nbsp;&nbsp;&nbsp; Currencies of Bid and Payment 21</p><p>19.&nbsp;&nbsp;&nbsp; Period of Validity of Bids. 21</p><p>20.&nbsp;&nbsp;&nbsp; Bid Security. 22</p><p>21.&nbsp;&nbsp;&nbsp; Format and Signing of Bid. 24</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Submission of Bids. 24</strong></p><p>22.&nbsp;&nbsp;&nbsp; Submission, Sealing and Marking of Bids. 24</p><p>23.&nbsp;&nbsp;&nbsp; Deadline for Submission of Bids. 25</p><p>24.&nbsp;&nbsp;&nbsp; Late Bids. 25</p><p>25.&nbsp;&nbsp;&nbsp; Withdrawal, Substitution, and Modification of Bids. 25</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Public Opening of Technical Parts of Bids. 26</strong></p><p>26.&nbsp;&nbsp;&nbsp; Public Opening of Technical Parts of Bids. 26</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Bids- General Provisions. 27</strong></p><p>27.&nbsp;&nbsp;&nbsp; Confidentiality. 27</p><p>28.&nbsp;&nbsp;&nbsp; Clarification of Bids. 28</p><p>29.&nbsp;&nbsp;&nbsp; Deviations, Reservations, and Omissions. 28</p><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Technical Part of Bids. 29</strong></p><p>30.&nbsp;&nbsp;&nbsp; Determination of Responsiveness of Technical Part 29</p><p>31.&nbsp;&nbsp;&nbsp; Eligibility and Qualifications of the Bidder 29</p><p>32.&nbsp;&nbsp;&nbsp; Detailed Evaluation of Technical Part 30</p><p><strong>H.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Notification of Evaluation of Technical Parts and Public Opening of Financial Parts. 30</strong></p><p>33.&nbsp;&nbsp;&nbsp; Notification of Evaluation of Technical Parts and Public Opening of Financial Parts. 30</p><p><strong>I.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Financial Part of Bids. 32</strong></p><p>34.&nbsp;&nbsp;&nbsp; Adjustments for Non-material Noconformities. 32</p><p>35.&nbsp;&nbsp;&nbsp; Correction of Arithmetic Errors. 32</p><p>36.&nbsp;&nbsp;&nbsp; Evaluation Process, Financial Part 32</p><p>37.&nbsp;&nbsp;&nbsp; Abnormally Low Bids. 33</p><p>38.&nbsp;&nbsp;&nbsp; Unbalanced or Front Loaded Bids. 33</p><p><strong>J.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Combined Technical and Financial Parts, Most Advantageous Bid and Notification of Intention to Award. 34</strong></p><p>39.&nbsp;&nbsp;&nbsp; Evaluation of combined Technical and Financial Parts, Most Advantageous Bid. 34</p><p>40.&nbsp;&nbsp;&nbsp; Employer&rsquo;s right to Accept Any Bid and to Reject Any or All Bids. 34</p><p>41.&nbsp;&nbsp;&nbsp; Standstill Period. 35</p><p>42.&nbsp;&nbsp;&nbsp; Notification of Intention to Award. 35</p><p><strong>K.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Award of Contract 35</strong></p><p>43.&nbsp;&nbsp;&nbsp; Award Criteria. 35</p><p>44.&nbsp;&nbsp;&nbsp; Notification of Award. 35</p><p>45.&nbsp;&nbsp;&nbsp; Debriefing by the Employer 36</p><p>46.&nbsp;&nbsp;&nbsp; Signing of Contract 37</p><p>47.&nbsp;&nbsp;&nbsp; Performance Security. 37</p><p>48.&nbsp;&nbsp;&nbsp; Procurement Related Complaint 38</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section I - Instructions to Bidders</strong></p><p>&nbsp;</p><table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:102%\"><tbody><tr><td colspan=\"2\" style=\"height:50px; width:99%\"><ol><li><strong>General</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Scope of Bid</strong></li></ol></td><td rowspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>In connection with the Specific Procurement Notice - Request for Bids (RFB), specified in the Bid Data Sheet (BDS), the Employer, as specified<strong> in the BDS</strong>, issues this bidding document for the Design, Supply and Installation of Plant as specified in Section VII, Employer&rsquo;s Requirements. The name, identification, and number of lots (contracts) of this RFB are specified<strong> in the BDS.</strong></li><li>Throughout this bidding document:</li></ol></li><li>the term <strong>&ldquo;in writing&rdquo; </strong>means communicated in written form (e.g., by mail, e-mail, fax, including if specified <strong>in the BDS,</strong> distributed or received through the electronic-procurement system used by the Employer) with proof of receipt;</li><li>if the context so requires, &ldquo;singular&rdquo; means &ldquo;plural&rdquo; and vice versa;</li><li><strong>&ldquo;Day&rdquo;</strong> means calendar day, unless otherwise specified as <strong>&ldquo;Business Day.&rdquo;</strong> A Business Day is any day that is an official working day of the Borrower. It excludes the Borrower&rsquo;s official public holidays;</li><li>&nbsp;<strong>&ldquo;ES&rdquo;</strong> means environmental and social (including Sexual Exploitation and Abuse (SEA), and Sexual Harassment (SH));</li><li><strong>&ldquo;Sexual Exploitation and Abuse&rdquo; &ldquo;(SEA)&rdquo;</strong> means the following:</li></ol><p><strong>Sexual Exploitation</strong> is defined as any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another.&nbsp;&nbsp;</p><p><strong>Sexual Abuse</strong> is defined as the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions.</p><ol><li><strong>&ldquo;Sexual Harassment&rdquo; &ldquo;(SH)&rdquo;</strong> is defined as unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature by the Contractor&rsquo;s Personnel with other Contractor&rsquo;s or Employer&rsquo;s Personnel.</li><li><strong>&ldquo;Contractor&rsquo;s Personnel&rdquo;</strong> is as defined in GCC Sub-Clause 1; and</li><li><strong>&ldquo;Employer&rsquo;s Personnel&rdquo;</strong> is as defined in GCC Sub-Clause 1.</li></ol><p>A non-exhaustive list of (i) behaviors which constitute SEA and (ii) behaviors which constitute SH is attached to the Code of Conduct form in Section IV.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Source of Funds</strong></li></ol></td><td rowspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Borrower or Recipient (hereinafter called &ldquo;Borrower&rdquo;) indicated<strong> in the BDS</strong> has applied for or received financing (hereinafter called &ldquo;funds&rdquo;) from the World Bank (hereinafter called &ldquo;the Bank&rdquo;) in an amount specified<strong> in BDS</strong>, toward the project named <strong>in BDS</strong>.&nbsp; The Borrower intends to apply a portion of the funds to eligible payments under the contract(s) for which this bidding document is issued.</li><li>Payment by the Bank will be made only at the request of the Borrower and upon approval by the Bank in accordance with the terms and conditions of the Loan (or other financing) Agreement. The Loan (or other financing) Agreement prohibits a withdrawal from the loan account for the purpose of any payment to persons or entities, or for any import of goods, equipment, plant, or materials, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No party other than the Borrower shall derive any rights from the Loan (or other financing) Agreement or have any claim to the proceeds of the Loan (or other financing).</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:77px; vertical-align:top; width:24%\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:5px; vertical-align:top; width:24%\"><ol><li><strong>Fraud and Corruption</strong></li></ol></td><td style=\"height:5px; vertical-align:top; width:75%\"><ol><li><ol><li>The Bank requires compliance with the Bank&rsquo;s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework, as set forth in Section VI.</li><li>In further pursuance of this policy, bidders shall permit and shall cause their agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit the Bank to inspect all accounts, records and other documents relating to any initial selection process, prequalification process, bid submission, proposal submission and contract performance (in the case of award), and to have them audited by auditors appointed by the Bank.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Eligible Bidders</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder may be a firm that is a private entity, a state-owned enterprise or institution subject to ITB 4.6, or any combination of such entities in the form of a joint venture (JV) under an existing agreement or with the intent to enter into such an agreement supported by a letter of intent.&nbsp; In the case of a joint venture, all members shall be jointly and severally liable for the execution of the entire Contract in accordance with the Contract terms. The JV shall nominate a Representative who shall have the authority to conduct all business for and on behalf of any and all the members of the JV during the Bidding process and, in the event the JV is awarded the Contract, during contract execution. Unless specified <strong>in the BDS</strong>, there is no limit on the number of members in a JV.</li><li>A Bidder shall not have a conflict of interest. Any Bidder found to have a conflict of interest shall be disqualified. A Bidder may be considered to have a conflict of interest for the purpose of this Bidding process, if the Bidder:</li></ol></li><li>directly or indirectly controls, is controlled by or is under common control with another Bidder; or</li><li>receives or has received any direct or indirect subsidy from another Bidder; or</li><li>has the same legal representative as another Bidder; or</li><li>has a relationship with another Bidder, directly or through common third parties, that puts it in a position to influence the Bid of another Bidder, or influence the decisions of the Employer regarding this Bidding process; or</li><li>or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the Plant and Installation Services that are the subject of the Bid; or</li><li>or any of its affiliates has been hired (or is proposed to be hired) by the Employer or Borrower as Project Manager for the Contract implementation; or</li><li>would be providing goods, works, or non-consulting services resulting from or directly related to consulting services for the preparation or implementation of the project specified in the BDS ITB 2.1 that it provided or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm; or</li><li>has a close business or family relationship with a professional staff of the Borrower (or of the project implementing agency, or of a recipient of a part of the loan) who: (i) are directly or indirectly involved in the preparation of the bidding document or specifications of the Contract, and/or the Bid evaluation process of such Contract; or (ii) would be involved in the implementation or supervision of such contract unless the conflict stemming from such relationship has been resolved in a manner acceptable to the Bank throughout the Bidding process and execution of the Contract.<ol><li>A firm that is a Bidder (either individually or as a JV member) shall not participate as a Bidder or as JV member in more than one Bid except for permitted alternative Bids. Such participation shall result in the disqualification of all Bids in which the firm is involved. However, this does not limit the participation of a Bidder as subcontractor in another Bid or of a firm as a subcontractor in more than one Bid.</li><li>A Bidder may have the nationality of any country, subject to the restrictions pursuant to ITB 4.8. A Bidder shall be deemed to have the nationality of a country if the Bidder is constituted, incorporated or registered in and operates in conformity with the provisions of the laws of that country, as evidenced by its articles of incorporation (or equivalent documents of constitution or association) and its registration documents, as the case may be. This criterion also shall apply to the determination of the nationality of proposed subcontractors or subconsultants for any part of the Contract including related Services.</li><li>A Bidder that has been sanctioned by the Bank, pursuant to the Bank&rsquo;s Anti-Corruption Guidelines, in accordance with its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework as described in Section VI paragraph 2.2 d., shall be ineligible to be prequalified for, initially selected for, bid for, propose for, or be awarded a Bank-financed contract or benefit from a Bank-financed contract, financially or otherwise, during such period of time as the Bank shall have determined. The list of debarred firms and individuals is available at the electronic address specified in the BDS.</li><li>Bidders that are state-owned enterprises or institutions in the Employer&rsquo;s Country may be eligible to compete and be awarded a Contract(s) only if they can establish, in a manner acceptable to the Bank, that they (i) are legally and financially autonomous (ii) operate under commercial law, and (iii) are not under supervision of the Employer.</li><li>A Bidder shall not be under suspension from Bidding by the Employer as the result of the operation of a Bid-Securing Declaration or Proposal-Securing Declaration.</li><li>Firms and individuals may be ineligible if so indicated in Section V and (a)as a matter of law or official regulations, the Borrower&rsquo;s country prohibits commercial relations with that country, provided that the Bank is satisfied that such exclusion does not preclude effective competition for the supply of goods or the contracting of works or services required; or (b)by an act of compliance with a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations, the Borrower&rsquo;s country prohibits any import of goods or contracting of works or services from that country, or any payments to any country, person, or entity in that country. Where the procurement is implemented across jurisdictional boundaries (and more than one country is a Borrower, and is involved in the procurement), then exclusion of a firm or individual on the basis of ITB 4.8 (a) above by any country may be applied to that procurement across other countries involved, if the Bank and the Borrowers involved in the procurement agree.</li><li>A Bidder shall provide such documentary evidence of eligibility satisfactory to the Employer, as the Employer shall reasonably request.&nbsp;&nbsp;&nbsp;&nbsp;</li><li>A firm that is under a sanction of debarment by the Borrower from being awarded a contract is eligible to participate in this procurement, unless the Bank, at the Borrower&rsquo;s request, is satisfied that the debarment; (a) relates to fraud or corruption, and (b) followed a judicial or administrative proceeding that afforded the firm adequate due process.</li><li>This bidding is open only to prequalified Bidders unless specified <strong>in the BDS</strong>.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:228px; vertical-align:top; width:24%\"><ol><li><strong>Eligible Plant and Installation Services</strong></li></ol></td><td style=\"height:228px; vertical-align:top; width:75%\"><ol><li><ol><li>The Plant and Installation Services to be supplied under the Contract and financed by the Bank may have their origin in any country in accordance with Section V, Eligible Countries.</li><li>For purposes of ITB 5.1 above, &ldquo;origin&rdquo; means the place where the Plant, or component parts thereof are mined, grown, produced or manufactured, and from which the services are provided.&nbsp; Plant components are produced when, through manufacturing, processing, or substantial or major assembling of components, a commercially recognized product results that is substantially different in its basic characteristics or in purpose or utility from its components.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Contents of Bidding Document</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Sections of&nbsp; Bidding Document</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The bidding document consists of Parts 1, 2, and 3, which include all the sections indicated below, and should be read in conjunction with any Addenda issued in accordance with ITB 8.</li></ol></li></ol><p><strong>PART 1. Bidding Procedures</strong></p><ul><li>Section I - Instructions to Bidders (ITB)</li><li>Section II - Bid Data Sheet (BDS)</li><li>Section III - Evaluation and Qualification Criteria</li><li>Section IV - Bidding Forms</li><li>Section V - Eligible Countries</li><li>Section VI - Fraud and Corruption</li></ul><p><strong>PART 2. Employer&rsquo;s Requirements</strong></p><ul><li>Section VII -Employer&rsquo;s Requirements</li></ul><p><strong>PART 3. Conditions of Contract and Contract Forms</strong></p><ul><li>Section VIII - General Conditions of Contract (GCC)</li><li>Section IX -Particular Conditions of Contract (PCC)</li><li>Section X -Contract Forms<ol><li>The Specific Procurement Notice-Request for Bids (RFB) issued by the Employer, or the Notice of Request for Bids (RFB) issued by the Employer to the prequalified Bidders are not part of the bidding document.</li><li>Unless obtained directly from the Employer, the Employer is not responsible for the completeness of the document, responses to requests for clarification, the Minutes of the pre-Bid meeting (if any), or Addenda to the bidding document in accordance with ITB 8. In case of any contradiction, documents obtained directly from the Employer shall prevail.</li><li>The Bidder is expected to examine all instructions, forms, terms, and specifications in the bidding document and to furnish with its Bid all information or documentation as is required by the bidding document.</li></ol></li></ul></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Clarification of Bidding Document, Site Visit, Pre-Bid Meeting</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder requiring any clarification of the bidding document shall contact the Employer in writing at the Employer&rsquo;s address indicated <strong>in the BDS </strong>or raise his enquiries during the pre-Bid meeting if provided for in accordance with ITB 7.4. The Employer will respond in writing to any request for clarification, provided that such request is received prior to the deadline for submission of Bids within a period specified <strong>in the BDS</strong>.&nbsp; The Employer shall forward copies of its response to all Bidders who have acquired the bidding document in accordance with ITB 6.3, including a description of the inquiry but without identifying its source. If so specified <strong>in the BDS</strong>, the Employer shall also promptly publish its response at the web page identified <strong>in the BDS</strong>. Should the clarification result in changes to the essential elements of the bidding document, the Employer shall amend the bidding document following the procedure under ITB 8 and ITB 23.2.</li><li>The Bidder is advised to visit and examine the site where the Plant is to be installed and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid and entering into a Contract for the provision of Plant and Installation Services. The costs of visiting the site shall be at the Bidder&rsquo;s own expense.</li><li>The Bidder and any of its personnel or agents will be granted permission by the Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the Bidder, its personnel, and agents will release and indemnify the Employer and its personnel and agents from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.</li><li>If so specified <strong>in the BDS</strong>, the Bidder&rsquo;s designated representative is invited to attend a pre-Bid meeting and/or a site visit. The purpose of the meeting will be to clarify issues and to answer questions on any matter that may be raised at that stage.</li><li>The Bidder is requested to submit any questions in writing, to reach the Employer not later than one week before the meeting.</li><li>Minutes of the pre-Bid meeting, including the text of the questions raised without identifying the source, and the responses given, together with any responses prepared after the meeting, will be transmitted promptly to all Bidders who have acquired the bidding document in accordance with ITB 6.3.&nbsp; If so specified<strong> in the BDS,</strong> the Employer shall also promptly publish the Minutes of the pre-Bid meeting at the web page identified <strong>in the BDS</strong>. Any modification to the bidding document that may become necessary as a result of the pre-Bid meeting shall be made by the Employer exclusively through the issue of an Addendum pursuant to ITB 8 and not through the minutes of the pre-Bid meeting. Nonattendance at the pre-Bid meeting will not be a cause for disqualification of a Bidder.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:232px; vertical-align:top; width:24%\"><ol><li><strong>Amendment of Bidding Document</strong></li></ol></td><td style=\"height:232px; vertical-align:top; width:75%\"><ol><li><ol><li>At any time prior to the deadline for submission of Bids, the Employer may amend the bidding document by issuing addenda.</li><li>Any addendum issued shall be part of the bidding document and shall be communicated in writing to all who have obtained the bidding document from the Employer in accordance with ITB 6.3. The Employer shall also promptly publish the addendum on the Employer&rsquo;s web page in accordance with ITB 7.1.</li><li>To give prospective Bidders reasonable time in which to take an addendum into account in preparing their Bids, the Employer may, at its discretion, extend the deadline for the submission of bids, pursuant to ITB 23.2.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Preparation of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Cost of Bidding</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall bear all costs associated with the preparation and submission of its Bid, and the Employer shall not be responsible or liable for those costs, regardless of the conduct or outcome of the Bidding process.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Language of Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bid, as well as all correspondence and documents relating to the Bid exchanged by the Bidder and the Employer, shall be written in the language specified<strong> in the BDS</strong>. Supporting documents and printed literature that are part of the Bid may be in another language provided they are accompanied by an accurate translation of the relevant passages in the language specified <strong>in the BDS</strong>, in which case, for purposes of interpretation of the Bid, such translation shall govern.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Comprising the Bid</strong></li></ol></td><td colspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bid shall comprise two Parts, namely the Technical Part and the Financial Part. These two Parts shall be submitted simultaneously in two separate sealed envelopes (two-envelope Bidding process). One envelope shall contain only information relating to the Technical Part and the other, only information relating to the Financial Part. These two envelopes shall be enclosed in a separate sealed outer envelope marked &ldquo;Original Bid&rdquo;</li><li>The Technical Part shall comprise the following:</li></ol></li><li><strong>Letter of Bid - Technical Part, prepared in accordance with ITB12;</strong></li><li><strong>Bid Security or Bid Securing Declaration, in accordance with ITB 20;</strong></li><li><strong>Alternative Bid - Technical Part: if permissible in accordance with ITB 13, the Technical Part of any Alternative Bid;</strong></li><li><strong>Authorization: written confirmation authorizing the signatory of the Bid to commit the Bidder, in accordance with ITB 21.3;</strong></li><li><strong>Eligibility of Plant and Installation Services: documentary evidence established in accordance with ITB 14.1 that the Plant and Installation Services offered by the Bidder in its Bid or in any alternative Bid, if permitted, are eligible;</strong></li><li><strong>Bidder&rsquo;s Eligibility and Qualifications: documentary evidence in accordance with ITB 15.1 establishing the Bidder&rsquo;s eligibility and qualifications ;</strong></li><li><strong>Conformity: documentary evidence in accordance with ITB 16 that the Plant and Installation Services offered by the Bidder conform to the bidding document;</strong></li><li><strong>Subcontractors: list of subcontractors in accordance with ITB 16.2; and</strong></li><li><strong>any other document required in the BDS.</strong><ol><li>The Financial Part shall contain the following:<ol><li><strong>Letter of Bid &ndash; Financial Part: prepared in accordance with ITB 12 and ITB 14;</strong></li><li><strong>Price Schedules completed in accordance with ITB 12 and ITB 17;</strong></li><li><strong>Alternative Bid - Financial Part: if permissible in accordance with ITB 13, the Financial Part of any Alternative Bid; and</strong></li><li><strong>any other document required in the BDS.</strong></li></ol></li><li>The Technical Part shall not include any information related to the Bid price. Where material financial information related to the Bid price is contained in the Technical Part the Bid shall be declared non-responsive.</li><li>In addition to the requirements under ITB 11.2, Bids submitted by a JV shall include in the Technical Part a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement.</li><li>The Bidder shall furnish in the Letter of Bid - Financial Part information on commissions and gratuities, if any, paid or to be paid to agents or any other party relating to this Bid</li></ol></li></ol></td></tr><tr><td style=\"height:48px; vertical-align:top; width:24%\"><ol><li><strong>Letters of Bid and Price Schedules</strong></li></ol></td><td style=\"height:48px; vertical-align:top; width:75%\"><ol><li><ol><li>The Letter of Bid - Technical Part and the Letter of Bid- Financial Part including the Price Schedules shall be prepared, using the relevant forms furnished in Section IV, Bidding Forms.&nbsp; The forms must be completed as instructed in each form without any alterations to the text, and no substitutes shall be accepted except as provided under ITB 21.3. All blank spaces shall be filled in with the information requested.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:451px; vertical-align:top; width:24%\"><ol><li><strong>Alternative Bids</strong></li></ol></td><td style=\"height:451px; vertical-align:top; width:75%\"><ol><li><ol><li>Unless otherwise specified<strong> in the BDS</strong>, alternative Bids shall not be considered.</li><li>When alternatives to the Time Schedule are explicitly invited, a statement to that effect will be included <strong>in the BDS</strong>, and the method of evaluating different time schedules will be described in Section III, Evaluation and Qualification Criteria.</li><li>Except as provided under ITB 13.4 below, Bidders wishing to offer technical alternatives to the Employer&rsquo;s requirements as described in the bidding document must also provide: (i) a price at which they are prepared to offer a Plant meeting the Employer&rsquo;s requirements; and (ii) all information necessary for a complete evaluation of the alternatives by the Employer, including drawings, design calculations, technical specifications, breakdown of prices, and proposed installation methodology and other relevant details.&nbsp; Only the technical alternatives, if any, of the Bidder with the Most Advantageous Bid conforming to the basic technical requirements shall be considered by the Employer.</li><li>When Bidders are invited <strong>in the BDS </strong>to submit alternative technical solutions for specified parts of the facilities, such parts <strong>will be identified</strong><strong> in the BDS</strong>, as will the method for their evaluation, and described in Section VII, Employer&rsquo;s Requirements.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Eligibility of the Plant and Installation Services</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To establish the eligibility of the Plant and Installation Services in accordance with ITB 5, Bidders shall complete the country of origin declarations in the Price Schedule Forms, included in Section IV, Bidding Forms.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Eligibility and Qualifications of the Bidder</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To establish Bidder&rsquo;s eligibility in accordance with ITB 4, Bidders shall complete the Letter of Bid- Technical Part, included in Section IV, Bidding Forms.</li><li>To establish its qualifications to perform the Contract in accordance with Section III, Evaluation and Qualification Criteria, the Bidder shall provide the information requested in the corresponding information sheets included in Section IV, Bidding Forms.</li><li>Any change in the structure or formation of a Bidder after being prequalified and invited to Bid, if applicable, (including, in the case of a JV, any change in the structure or formation of any member and also including any change in any specialized subcontractor whose qualifications were considered to prequalify the Applicant) shall be subject to the written approval of the Employer prior to the deadline for submission of Bids. Such approval shall be denied if (i) a Bidder proposes to associate with a disqualified Bidder or in case of a disqualified joint venture, any of its members; (ii) as a consequence of the change, the Bidder no longer substantially meets the qualification criteria; or (iii) in the opinion of the Employer, the change may result in a substantial reduction in competition. Any such change should be submitted to the Employer not later than fourteen (14) days after the date of the notice for RFB sent to the prequalified Bidders</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:390px; vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Conformity of the Plant and&nbsp; Installation Services</strong></li></ol></td><td style=\"height:390px; vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall furnish the information stipulated in Section IV, Bidding Forms in sufficient detail to demonstrate substantial responsiveness of the Bidders&rsquo; proposal to the work requirements and the completion time.&nbsp;</li><li>For major items of Plant and Installation Services as listed by the Employer in Section III, Evaluation and Qualification Criteria, which the Bidder intends to purchase or subcontract, the Bidder shall give details of the name and nationality of the proposed Subcontractors, including manufacturers, for each of those items. In addition, the Bidder shall include in its Bid information establishing compliance with the requirements specified by the Employer for these items.&nbsp; Quoted rates and prices will be deemed to apply to whichever Subcontractor is appointed, and no adjustment of the rates and prices will be permitted.</li><li>The Bidder shall be responsible for ensuring that any Subcontractor proposed complies with the requirements of ITB 4, and that any Plant, or services to be provided by the Subcontractor comply with the requirements of ITB 5 and ITB 16.1.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Bid Prices and Discounts</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Unless otherwise specified <strong>in the BDS</strong>, Bidders shall quote for the entire Plant and Installation Services on a &ldquo;single responsibility&rdquo; basis. The total Bid price shall include all the Contractor&rsquo;s obligations mentioned in or to be reasonably inferred from the bidding document in respect of the design, manufacture, including procurement and subcontracting (if any), delivery, construction, installation and completion of the Plant.&nbsp; This includes all requirements under the Contractor&rsquo;s responsibilities for testing, pre-commissioning and commissioning of the Plant and, where so required by the bidding document, the acquisition of all permits, approvals and licenses, etc.; the operation, maintenance and training services and such other items and services as specified in the bidding document, all in accordance with the requirements of the General Conditions. Items against which no price is entered by the Bidder will not be paid for by the Employer when executed and shall be deemed to be covered by the prices for other items.</li><li>Bidders are required to quote the price for the commercial, contractual and technical obligations outlined in the bidding document.</li><li>Bidders shall give a breakdown of the prices in the manner and detail called for in the Price Schedules included in Section IV, Bidding Forms.</li><li>Depending on the scope of the Contract, the Price Schedules may comprise up to the six (6) schedules listed below.&nbsp; Separate numbered Schedules included in Section IV, Bidding Forms, from those numbered 1 to 4 below, shall be used for each of the elements of the Plant and Installation Services. The total amount from each Schedule corresponding to an element of the Plant and Installation Services shall be summarized in the schedule titled Grand Summary, (Schedule 5), giving the total Bid price(s) to be entered in the Letter of Bid. Bidders shall note that the plant and equipment included in Schedule Nos. 1 and 2 below exclude materials used for civil, building and other construction works.&nbsp; All such materials shall be included and priced under Schedule No. 4, Installation Services. The Schedules comprise:</li></ol></li></ol><p><strong>Schedule No. 1</strong>:&nbsp;&nbsp;&nbsp; Plant (including Mandatory Spare Parts) Supplied from Abroad</p><p><strong>Schedule No. 2</strong>:&nbsp;&nbsp;&nbsp; Plant (including Mandatory Spare Parts) Supplied from within the Employer&rsquo;s Country</p><p><strong>Schedule No. 3</strong>:&nbsp;&nbsp;&nbsp; Design Services</p><p><strong>Schedule No. 4</strong>:&nbsp;&nbsp;&nbsp; Installation Services</p><p><strong>Schedule No. 5</strong>:&nbsp;&nbsp;&nbsp; Grand Summary (Schedule Nos.1 to 4)</p><p><strong>Schedule No. 6</strong>:&nbsp;&nbsp;&nbsp; Recommended Spare Parts</p><ol><li><ol><li>In the Schedules, Bidders shall give the required details and a breakdown of their prices as follows:<ol><li>Plant to be supplied from abroad (Schedule No. 1):</li></ol></li></ol></li></ol><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The price of the Plant shall be quoted on CIP-named place of destination basis as specified <strong>in the BDS</strong>.</p><ol><li><ol><li><ol><li>Plant manufactured within the Employer&rsquo;s Country (Schedule No. 2):</li></ol></li></ol></li></ol><p>(i) &nbsp;&nbsp; The price of the Plant shall be quoted on an EXW Incoterm basis (such as &ldquo;ex-works,&rdquo; &ldquo;ex-factory,&rdquo; &ldquo;ex-warehouse&rdquo; or &ldquo;off-the-shelf,&rdquo; as applicable), including all customs duties, sales and other taxes already paid or payable on the components and raw materials used in the manufacture or assembly of the Plant;</p><p>(ii)&nbsp;&nbsp; Sales tax and all other taxes payable in the Employer&rsquo;s Country on the Plant if the contract is awarded to the Bidder;</p><ol><li><ol><li><ol><li>Design Services (Schedule No. 3);</li><li>Installation Services shall be quoted separately (Schedule No. 4) and shall include rates or prices for local transportation to named place of final destination as specified<strong> in the BDS</strong>, insurance and other services incidental to delivery of the Plant, all labor, contractor&rsquo;s equipment, temporary works, materials, consumables and all matters and things of whatsoever nature, including operations and maintenance services, the provision of operations and maintenance manuals, training, etc., where identified in the bidding document, as necessary for the proper execution of the installation and other services, including all taxes, duties, levies and charges payable in the Employer&rsquo;s Country as of twenty-eight (28) days prior to the deadline for submission of Bids;</li></ol></li></ol></li></ol><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; Recommended spare parts shall be quoted separately (Schedule 6) as specified in either subparagraph (a) or (b) above in accordance with the origin of the spare parts.</p><ol><li><ol><li>The terms EXW, CIP, and other similar terms shall be governed by the rules prescribed in the current edition of Incoterms, published by the International Chamber of Commerce, as specified<strong> in the BDS.</strong></li><li>The prices shall be either fixed or adjustable as specified<strong> in the BDS.</strong></li><li>In the case of <strong>Fixed Price</strong>, prices quoted by the Bidder shall be fixed during the Bidder&rsquo;s performance of the contract and not subject to variation on any account.&nbsp; A Bid submitted with an adjustable price quotation will be treated as non-responsive and rejected.</li><li>In the case of <strong>Adjustable Price</strong>, prices quoted by the Bidder shall be subject to adjustment during performance of the contract to reflect changes in the cost elements such as labor, material, transport and contractor&rsquo;s equipment in accordance with the procedures specified in the corresponding Appendix to the Contract Agreement. A Bid submitted with a fixed price quotation will not be rejected, but the price adjustment will be treated as zero.&nbsp; Bidders are required to indicate the source of labor and material indices in the corresponding Form in Section IV, Bidding Forms.</li><li>If so indicated in ITB 1.1, Bids are being invited for individual lots (contracts) or for any combination of lots (packages).&nbsp; Bidders wishing to offer any price reduction (discount) for the award of more than one Contract shall specify in their Letter of Bid the price reductions applicable to each package, or alternatively, to individual Contracts within the package, and the manner in which the price reductions will apply. <strong>However, discounts on condition of award of more than one contract will not be used for Bid evaluation purpose.</strong></li><li>&nbsp;Bidders wishing to offer any unconditional discount shall specify in their Letter of Bid the offered discounts and the manner in which price discounts will apply.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Currencies of Bid and Payment</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The currency(ies) of the Bid and the currency(ies) of payments shall be the same.&nbsp; The Bidder shall quote in the currency of the Employer&rsquo;s country the portion of the Bid price that corresponds to expenditures incurred in the currency of the Employer&rsquo;s Country, unless otherwise specified <strong>in the BDS</strong>.</li><li>The Bidder may express the Bid price in any currency. If the Bidder wishes to be paid in a combination of amounts in different currencies, it may quote its price accordingly but shall use no more than three foreign currencies in addition to the currency of the Employer&rsquo;s Country.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Period of Validity of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Bids shall remain valid until the date specified<strong> in the BDS</strong> or any extended date if amended by the Employer in accordance with ITB 8. A Bid that is not valid until the date specified <strong>in the BDS,</strong> or any extended date if amended by the Employer in accordance with ITB 8, shall be rejected by the Employer as nonresponsive.</li><li>In exceptional circumstances, prior to the date of expiration of the Bid validity, the Employer may request Bidders to extend the period of validity of their Bids. The request and the responses shall be made in writing. If a Bid Security is requested in accordance with ITB 20, the Bidder granting the request shall also extend the Bid Security for twenty-eight (28) days beyond the deadline of the extended validity period. A Bidder may refuse the request without forfeiting its Bid Security. A Bidder granting the request shall not be required or permitted to modify its Bid, except as provided in ITB 19.3.</li><li>If the award is delayed by a period exceeding fifty-six (56) days beyond the expiry of the initial Bid validity specified in accordance with ITB 19.1, the Contract price shall be determined as follows:</li></ol></li><li>in the case of <strong>fixed price</strong> contracts, the Contract price shall be the Bid price adjusted by the factor or factors specified<strong> in the BDS</strong>;</li><li>in the case of <strong>adjustable price</strong> contracts, no adjustment shall be made; or</li><li>in any case, Bid evaluation shall be based on the Bid price without taking into consideration the applicable correction from those indicated above.</li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Bid Security</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall furnish as part of the Technical Part of its Bid, either a Bid-Securing Declaration or a Bid Security as specified <strong>in the BDS,</strong> in original form and, in the case of a Bid Security, in the amount and currency specified<strong> in the BDS</strong>.</li><li>A Bid-Securing Declaration shall use the form included in Section IV Bidding Forms.</li><li>If a Bid Security is specified pursuant to ITB 20.1, the Bid security shall be a demand guarantee in any of the following forms at the Bidder&rsquo;s option:</li></ol></li><li>an unconditional guarantee issued by a bank or non-bank financial institution (such as an insurance, bonding or surety company);</li><li>an irrevocable letter of credit;</li><li>a cashier&rsquo;s or certified check; or</li><li>another security indicated <strong>in the BDS</strong>,</li></ol><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; from a reputable source from an eligible country. If an unconditional guarantee is issued by a non-bank financial institution located outside the Employer&rsquo;s Country the issuing non-bank financial institution shall have a correspondent financial institution located in the Employer&rsquo;s Country to make it enforceable unless the Employer has agreed in writing, prior to Bid submission, that a correspondent financial institution is not required. In the case of a bank guarantee, the Bid Security shall be submitted either using the Bid Security Form included in Section IV, Bidding Forms, or in another substantially similar format approved by the Employer prior to Bid submission. The Bid Security shall be valid for twenty-eight (28) days beyond the original date of expiry of the Bid validity, or beyond any extended date if requested under ITB 19.2.</p><ol><li><ol><li>If a Bid Security or a Bid-Securing Declaration is specified pursuant to ITB 20.1, any Bid not accompanied by a substantially responsive Bid Security or Bid-Securing Declaration shall be rejected by the Employer as nonresponsive.</li><li>If a Bid Security is specified pursuant to ITB 20.1, the Bid Security of unsuccessful Bidders shall be returned as promptly as possible upon the successful Bidder&rsquo;s furnishing of the Performance Security pursuant to ITB 47.</li><li>The Bid Security of the successful Bidder shall be returned as promptly as possible once the successful Bidder has signed the Contract and furnished the required Performance Security.</li><li>The Bid Security may be forfeited:</li></ol></li><li>if a Bidder withdraws its Bid prior to the expiry date of the Bid validity specified by the Bidder on the Letter of Bid or any extended date provided by the Bidder; or</li><li>if the successful Bidder fails to:</li></ol><ol><li>sign the Contract in accordance with ITB 46; or</li><li>furnish a Performance Security in accordance with ITB 47.<ol><li>The Bid Security or the Bid-Securing Declaration of a JV shall be in the name of the JV that submits the Bid. If the JV has not been legally constituted into a legally enforceable JV at the time of bidding, the Bid Security or the Bid Securing Declaration shall be in the names of all future members as named in the letter of intent referred to in ITB 4.1 and ITB 11.5.</li><li>If a Bid Security is not required <strong>in the BDS</strong>: and</li></ol></li></ol><ol><li>if a Bidder withdraws its Bid prior to the expiry date of the Bid validity specified by the Bidder on the Letter of Bid, or any extended date provided by the Bidder; or</li><li>if the successful Bidder fails to:</li></ol><ol><li>sign the Contract in accordance with ITB 46; or</li><li>furnish a Performance Security in accordance with ITB 47;</li></ol><p>the Borrower may<strong>, </strong>if provided for<strong> in the BDS</strong>, declare the Bidder disqualified to be awarded a contract by the Employer for a period of time as stated<strong> in the BDS</strong>.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Format and Signing of Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall prepare the Bid, in accordance with this Instruction, ITB 11 and ITB 22.</li><li>Bidders shall mark as &ldquo;Confidential&rdquo; information in their Bids which is confidential to their business. This may include proprietary information, trade secrets or commercial or financially sensitive information.</li><li>The original and all copies of the Bid shall be typed or written in indelible ink and shall be signed by a person duly authorized to sign on behalf of the Bidder.&nbsp; This authorization shall consist of a written confirmation as specified <strong>in the BDS </strong>and shall be attached to the Bid.&nbsp; The name and position held by each person signing the authorization must be typed or printed below the signature.&nbsp; All pages of the Bid where entries or amendments have been made shall be signed or initialed by the person signing the Bid.</li><li>In the case that the Bidder is a JV, the Bid shall be signed by an authorized representative of the JV on behalf of the JV, and so as to be legally binding on all the members as evidenced by a power of attorney signed by their legally authorized representatives.</li><li>Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialed by the person signing the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Submission of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Submission, Sealing and Marking of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall deliver the Bid in two separate, sealed envelopes (the Technical Part and the Financial Part.). These two envelopes shall be enclosed in a separate sealed outer envelope marked &ldquo;Original Bid&rdquo;. In addition, the Bidder shall submit copies of the Bid in the number specified <strong>in the BDS</strong>. Copies of the Technical Part shall be placed in a separate sealed envelope marked &ldquo;Copies: Technical Part&rdquo;. Copies of the Financial Part shall be placed in a separate sealed envelope marked &ldquo;Copies: Financial Part&rdquo;. The Bidder shall place both of these envelopes in a separate, sealed outer envelope marked &ldquo;Bid Copies&rdquo;. In the event of any discrepancy between the original and the copies, the original shall prevail.</li><li>If alternative Bids are permitted in accordance with ITB 13, the alternative Bids shall be submitted as follows: the original of the alternative Bid Technical Part shall be placed in a sealed envelope marked &ldquo;Alternative Bid &ndash; Technical Part&rdquo; and the Financial Part shall be placed in a sealed envelope marked &ldquo;Alternative Bid &ndash; Financial Part&rdquo; and these two separate sealed envelopes then enclosed within a sealed outer envelope marked &ldquo;Alternative Bid &ndash; Original&rdquo;, the copies of the alternative Bid will be placed in separate sealed envelopes marked &ldquo;Alternative Bid &ndash; Copies Of Technical Part&rdquo;, and &ldquo;Alternative Bid &ndash; Copies Of Financial Part&rdquo; and enclosed in a separate sealed outer envelope marked &ldquo;Alternative Bid - Copies&rdquo;.</li><li>The envelopes marked &ldquo;Original Bid&rdquo; and &ldquo;Bid Copies&rdquo; (and, if appropriate, a third envelope marked &ldquo;Alternative Bid&rdquo;) shall be enclosed in a separate sealed outer envelope for submission to the Employer.</li><li>The inner and outer envelopes shall:</li></ol></li><li><strong>bear the name and address of the Bidder;</strong></li><li><strong>be addressed to the Employer in accordance with ITB 23.1;</strong></li><li><strong>bear the specific identification of this Bidding process indicated in accordance with ITB 1.1; and</strong></li><li><strong>bear a warning not to open before the time and date for Bid opening.</strong><ol><li>If all envelopes are not sealed and marked as required, the Employer will assume no responsibility for the misplacement or premature opening of the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Deadline for Submission of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Bids must be received by the Employer at the address and no later than the date and time indicated <strong>in the BDS</strong>. When so specified<strong> in the BDS</strong>, Bidders shall have the option of submitting their Bids electronically. Bidders submitting Bids electronically shall follow the electronic Bid submission procedures specified<strong> in the BDS</strong>.</li><li>The Employer may, at its discretion, extend the deadline for the submission of Bids by amending the bidding document in accordance with ITB 8, in which case all rights and obligations of the Employer and Bidders previously subject to the deadline shall thereafter be subject to the deadline as extended.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Late Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall not consider any Bid that arrives after the deadline for submission of Bids, in accordance with ITB 23.&nbsp; Any Bid received by the Employer after the deadline for submission of Bids shall be declared late, rejected, and returned unopened to the Bidder.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Withdrawal, Substitution, and Modification of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and shall include a copy of the authorization in accordance with ITB 21.3, (except that withdrawal notices do not require copies). The corresponding substitution or modification of the Bid must accompany the respective written notice.&nbsp; All notices must be:</li></ol></li><li><strong>prepared and submitted in accordance with ITB 21 and ITB 22 (except that withdrawals notices do not require copies), and in addition, the respective envelopes shall be clearly marked &ldquo;Withdrawal,&rdquo; &ldquo;Substitution,&rdquo; &ldquo;Modification&rdquo;; and</strong></li><li><strong>received by the Employer prior to the deadline prescribed for submission of Bids, in accordance with ITB 23.</strong><ol><li>Bids requested to be withdrawn in accordance with ITB 25.1 shall be returned unopened to the Bidders.</li><li>No Bid may be withdrawn, substituted, or modified in the interval between the deadline for submission of Bids and the date of expiry of the Bid validity specified by the Bidder on the Letter of Bid or any extended date thereof.&nbsp;</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Public Opening of Technical Parts of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Public Opening of Technical Parts of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Except as in the cases specified in ITB 24 and ITB 25.2, the Employer shall publicly open and read out all Bids received by the deadline at the date, time and place specified <strong>in the BDS</strong> in the presence of Bidders&rsquo; designated representatives and anyone who choose to attend. Any specific electronic Bid opening procedures required if electronic Bidding is permitted in accordance with ITB 23.1, shall be as specified <strong>in the BDS</strong>.</li><li>First, the written notice of withdrawal in the envelopes marked &ldquo;Withdrawal&rdquo; shall be opened and read out and the envelope with the corresponding Bid shall not be opened but returned to the Bidder.&nbsp; No bid withdrawal shall be permitted unless the corresponding withdrawal notice contains a valid authorization to request the withdrawal and is read out at Bid opening.</li><li>Next, envelopes marked &ldquo;Substitution&rdquo; shall be opened and read out and exchanged with the corresponding Bid being substituted, and the substituted Bid shall not be opened, but returned to the Bidder. No Bid substitution shall be permitted unless the corresponding substitution notice contains a valid authorization to request the substitution and is read out at Bid opening.</li><li>Next, envelopes marked &ldquo;Modification&rdquo; shall be opened and read out with the corresponding Bid. No Bid modification shall be permitted unless the corresponding modification notice contains a valid authorization to request the modification and is read out at Bid opening.</li><li>Next, all other envelopes marked &ldquo;Technical Part&rdquo; shall be opened one at a time. All envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; shall remain sealed and kept by the Employer in safe custody until they are opened at a later public opening, following the evaluation of the Technical Part parts of the Bids. On opening the envelopes marked &ldquo;Technical Part&rdquo; the Employer shall read out: the name of the Bidder, the presence or the absence of a Bid Security, or Bid-Securing Declaration, if required, and whether there is a modification; and Alternative Bid - Technical Part; and any other details as the Employer may consider appropriate.&nbsp;</li><li>Only Technical Parts of Bids and Alternative Bid - Technical Parts that are read out at Bid opening shall be considered further for evaluation. The Letter of Bid- Technical Part and the separate sealed envelope marked &ldquo;Second Envelope: Financial Part&rdquo; are to be initialed by representatives of the Employer attending Bid opening in the manner specified<strong> in the BDS</strong>.</li><li>The Employer shall neither discuss the merits of any Bid nor reject any Bid (except for late Bids, in accordance with ITB 24.1).</li><li>The Employer shall prepare a record of the Bid opening that shall include, as a minimum:<ol><li>the name of the Bidder and whether there is a withdrawal, substitution, or modification;</li><li>the receipt of&nbsp; envelopes marked &ldquo;Second Envelope: Financial Part&rdquo;;</li><li>if applicable, any alternative Bid-Technical Part; and</li><li>the presence or absence of a Bid Security or a Bid-Securing Declaration.&nbsp;</li></ol></li><li>The Bidders&rsquo; representatives who are present shall be requested to sign the record.&nbsp; The omission of a Bidder&rsquo;s signature on the record shall not invalidate the contents and effect of the record.&nbsp; A copy of the record shall be distributed to all Bidders.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Bids- General Provisions</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Confidentiality</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Information relating to the evaluation of the Technical Part shall not be disclosed to Bidders or any other persons not officially concerned with the Bidding process until the notification of evaluation of the Technical Part in accordance with ITB 33. Information relating to the evaluation of Financial Part, the evaluation of combined Technical Part and Financial Part, and recommendation of contract award shall not be disclosed to Bidders or any other persons not officially concerned with the RFB process until the Notification of Intention to Award the Contract is transmitted to Bidders in accordance with ITB 42..</li><li>Any effort by a Bidder to influence the Employer in the evaluation of the bids or Contract award decisions may result in the rejection of its Bid.</li><li>Notwithstanding ITB 27.2, from the time of Bid opening to the time of Contract Award, if any Bidder wishes to contact the Employer on any matter related to the Bidding process, it should do so in writing.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:266px; vertical-align:top; width:24%\"><ol><li><strong>Clarification of Bids</strong></li></ol><p>&nbsp;</p></td><td style=\"height:266px; vertical-align:top; width:75%\"><ol><li><ol><li>To assist in the examination, evaluation, and comparison of the Bids, and qualification of the Bidders, the Employer may, at its discretion, ask any Bidder for a clarification of its Bid.&nbsp; Any clarification submitted by a Bidder that is not in response to a request by the Employer shall not be considered.&nbsp; The Employer&rsquo;s request for clarification and the response shall be in writing.&nbsp; No change in the prices or substance of the Bid shall be sought, offered, or permitted, except to confirm the correction of arithmetic errors discovered by the Employer in the evaluation of the Bids, in accordance with ITB 35.</li><li>If a Bidder does not provide clarifications of its Bid by the date and time set in the Employer&rsquo;s request for clarification, its Bid may be rejected.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Deviations, Reservations, and Omissions</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>During the evaluation of Bids, the following definitions apply:</li></ol></li></ol><p>(a) &nbsp;&nbsp;&nbsp; &ldquo;Deviation&rdquo; is a departure from the requirements specified in the bidding document;</p><p>(b) &nbsp;&nbsp;&nbsp; &ldquo;Reservation&rdquo; is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the bidding document; and</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c) &ldquo;Omission&rdquo; is the failure to submit part or all of the information or documentation required in the bidding document.</p><ol><li><ol><li>Provided that a Bid is substantially responsive, the Employer may waive any nonmaterial nonconformities in the Bid.</li><li>Provided that a Bid is substantially responsive, the Employer may request that the Bidder submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities in the Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any aspect of the price of the Bid. Failure of the Bidder to comply with the request may result in the rejection of its Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Technical Part of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Determination of Responsiveness of Technical Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s determination of the Technical Part&rsquo;s responsiveness shall be based on the contents of the Bid, as specified in ITB 11.</li><li>Preliminary examination of the Technical Part shall be carried out to identify proposals that are incomplete, invalid or substantially nonresponsive to the requirements of the Bidding documents. A substantially responsive Bid is one that materially confirms to the requirements of the Bidding document without material deviation, reservation, or omission. A material deviation, reservation, or omission is one that,</li></ol></li></ol><ol><li><ol><li>if accepted, would:<ol><li><ol><li>affect in any substantial way the scope, quality, or performance of the Works specified in the Contract; or</li><li>limit in any substantial way, inconsistent with the Bidding document, the Employer&rsquo;s rights or the Bidder&rsquo;s &nbsp;obligations under the proposed Contract; or</li></ol></li></ol></li><li>if rectified, would unfairly affect the competitive position of other Bidders presenting substantially responsive Bids.</li></ol></li></ol><ol><li><ol><li>If the Technical Part is not substantially responsive to the requirements of the Bidding document, it shall be rejected by the Employer and may not subsequently be made responsive by correction of the material deviation, reservation, or omission.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Eligibility and Qualifications of the Bidder</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall determine to its satisfaction whether the Bidders that have been assessed to have submitted substantially responsive Bids are eligible, and either continue to meet (if prequalification applies) or meet (if prequalification has not been carried out), the qualifying criteria specified in Section III, Evaluation and Qualification Criteria.</li><li>The determination shall be based upon an examination of the documentary evidence of the Bidder&rsquo;s eligibility and qualifications submitted by the Bidder, pursuant to ITB 15. The determination shall not take into consideration the qualifications of other firms such as the Bidder&rsquo;s subsidiaries, parent entities, affiliates, subcontractors (other than Specialized Subcontractors if permitted in the bidding document), or any other firm.</li><li>Prior to Contract award, the Employer will verify that the successful Bidder (including each member of a JV) is not disqualified by the Bank due to noncompliance with contractual SEA/SH prevention and response obligations. The Employer will conduct the same verification for each subcontractor proposed by the successful Bidder. If any proposed subcontractor does not meet the requirement, the Employer will require the Bidder to propose a replacement subcontractor.</li><li>Only substantially responsive bids submitted by eligible and qualified bidders shall proceed to the detailed technical evaluation specified in ITB 32.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Detailed Evaluation of Technical Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s evaluation of Technical Part will be carried out as specified in Section III, Evaluation and Qualification Criteria.</li><li>The scores and weightings to be given to Rated Criteria (including technical and non-price factors and sub factors) are specified <strong>in the BDS</strong>.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Following the completion of the evaluation of the Technical Parts of the Bids, the Employer shall notify in writing those Bidders whose Bids were considered substantially non-responsive to the bidding document or failed to meet the eligibility and qualification requirements, advising them of the following information:</li></ol></li><li>the grounds on which their Technical Part of Bid failed to meet the requirements of the bidding document;</li><li>their envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; will be returned to them unopened after the completion of the selection process and the signing of the Contract; and</li><li>notify them of the date, time and location of the public opening of the envelopes marked &ldquo;Second Envelope: Financial Part&rdquo;.<ol><li>The Employer shall, simultaneously, notify in writing those Bidders whose Technical Part have been evaluated as substantially responsive to the bidding document and met the eligibility and qualification requirements, advising them of the following information:</li></ol></li></ol><ol><li>their Bid has been evaluated as substantially responsive to the bidding document and met the eligibility and qualification requirements;</li><li>their envelope marked &ldquo;Second Envelope: Financial Part&rdquo; will be opened at the public opening of the Financial Parts; and</li><li>notify them of the date, time and location of the second public opening of the envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; as specified <strong>in the BDS.</strong><ol><li>The opening date shall be not less than ten (10) Business Days from the date of notification of the results of the technical evaluation, specified in ITB 33.1 and 33.2. However, if the Employer receives a complaint on the results of the technical evaluation within the ten (10) Business Days, the opening date shall be subject to ITB 48.1. The Financial Part of the Bid shall be opened publicly in the presence of Bidders&rsquo; designated representatives and anyone who chooses to attend.</li><li>At this public opening, the Financial Parts will be opened by the Employer in the presence of Bidders, or their designated representatives and anyone else who chooses to attend. Bidders who met the eligibility and qualification requirements and whose bids were evaluated as substantially responsive will have their envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; opened at the second public opening. Each of these envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; shall be inspected to confirm that they have remained sealed and unopened. These envelopes shall then be opened by the Employer. The Employer shall read out the names of each Bidder, the technical score and the total Bid prices, per lot (contract) if applicable, including any discounts and Alternative Bid - Financial Part, and any other details as the Employer may consider appropriate.</li><li>Only envelopes of Financial Part of Bids, Financial Parts of Alternative Bids and discounts that are opened and read out at Bid opening shall be considered further for evaluation. The Letter of Bid &ndash; Financial Part and the Priced Activity Schedules are to be initialed by a representative of the Employer attending the Bid opening in the manner specified <strong>in the BDS.</strong></li><li>The Employer shall neither discuss the merits of any Bid nor reject any envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; at this public opening.</li><li>The Employer shall prepare a record of the Financial Part of the Bid opening that shall include, as a minimum: (a) the name of the Bidder whose Financial Part was opened; (b) the Bid price, per lot (contract) if applicable, including any discounts; and (c) if applicable, any Alternative Bid &ndash; Financial Part.</li><li>The Bidders whose envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; have been opened or their representatives who are present shall be requested to sign the record. The omission of a Bidder&rsquo;s signature on the record shall not invalidate the contents and effect of the record. A copy of the record shall be distributed to all Bidders<strong>. </strong></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Financial Part of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Adjustments for Non-material Noconformities</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Provided that a Bid is substantially responsive, the Employer shall rectify quantifiable nonmaterial nonconformities related to the Bid Price. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of a missing or non-conforming item or component by adding the average price of the item or component quoted by substantially responsive Bidders. <strong>&nbsp;</strong>If the price of the item or component cannot be derived from the price of other substantially responsive Bidders, the Employer shall use its best estimate.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Correction of Arithmetic Errors</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>In evaluating the Financial Part of each Bid, the Employer shall correct arithmetical errors on the following basis:</li></ol></li><li>where there are errors between the total of the amounts given under the column for the price breakdown and the amount given under the Total Price, the former shall prevail and the latter will be corrected accordingly;</li><li>where there are errors between the total of the amounts of Schedule Nos. 1 to 4 and the amount given in Schedule No. 5 (Grand Summary) the former shall prevail and the latter will be corrected accordingly;</li><li>if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to (a) and (b) above.<ol><li>Bidders shall be requested to accept correction of arithmetical errors. Failure to accept the correction in accordance with ITB 35.1, shall result in the rejection of the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Evaluation Process, Financial Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To evaluate the Financial Part, the Employer shall consider the following:</li></ol></li><li>the Bid price, excluding provisional sums and the provision, if any, for contingencies in the Price Schedules;</li><li>price adjustment for correction of arithmetic errors in accordance with ITB 35.1;</li><li>price adjustment due to discounts offered in accordance with ITB 17.11;</li><li>price adjustment due to quantifiable nonmaterial nonconformities in accordance with ITB 34.1;</li><li>converting the amount resulting from applying (a) to (c) above, if relevant, to a single currency in accordance with ITB 36.2; and &nbsp;</li><li>the evaluation factors indicated in the BDS and detailed in Section III, Evaluation and Qualification Criteria.<ol><li>For evaluation and comparison purposes, the currency(ies) of the Bid shall be converted into a single currency <strong>as specified</strong><strong> in the BDS</strong>.</li><li>No margin of domestic preference shall apply.</li><li>If price adjustment is allowed in accordance with ITB 17.7, the estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in Bid evaluation.</li><li>If this bidding document allows Bidders to quote separate prices for different lots (contracts), each lot will be evaluated separately to determine the Most Advantageous Bid using the methodology specified in Section III, Evaluation and Qualification Criteria. <strong>Discounts that are conditional on the award of more than one lotor slice shall not be considered for Bid evaluation.</strong></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Abnormally Low Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>An Abnormally Low Bid is one where the Bid price, in combination with other elements of the Bid, appears so low that it raises material concerns as to the capability of the Bidder to perform the Contract for the offered Bid Price.</li><li>In the event of identification of a potentially Abnormally Low Bid, the Employer shall seek written clarifications from the Bidder, including detailed price analyses of its Bid price in correlation to the subject matter of the contract, scope, proposed methodology, schedule, allocation of risks and responsibilities and any other requirements of the bidding document.</li><li>After evaluation of the price analyses, in the event that the Employer determines that the Bidder has failed to demonstrate its capability to deliver the contract for the offered tender price, the Employer shall reject the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Unbalanced or Front Loaded Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>If the Bid that is evaluated as the lowest evaluated cost is, in the Employer&rsquo;s opinion, seriously unbalanced or front loaded the Employer may require the Bidder to provide written clarifications. Clarifications may include detailed price analyses to demonstrate the consistency of the Bid prices with the scope of works, proposed methodology, schedule and any other requirements of the bidding document.</li><li>After the evaluation of the information and detailed price analyses presented by the Bidder, the Employer may:<ol><li>accept the Bid; or</li><li>if appropriate, require that the total amount of the Performance Security be increased, at the expense of the Bidder, to a level not exceeding twenty percent (20%) of the Contract Price; or</li><li>reject the Bid.</li></ol></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Combined Technical and Financial Parts, Most Advantageous Bid and Notification of Intention to Award</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Evaluation of combined Technical and Financial Parts, Most Advantageous Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s evaluation of responsive Bids will take into account technical factors, in addition to cost factors in accordance with Section III Evaluation and Qualification Criteria. The weight to be assigned for the Technical factors and cost is&nbsp; specified <strong>in the BDS</strong>. The Employer will rank the Bids based on the evaluated Bid score (B).</li><li>The Employer shall determine the Most Advantageous Bid. The Most Advantageous Bid is the Bid of the Bidder that meets the Qualification Criteria and whose Bid has been determined to be substantially responsive to the Bidding document and is the Bid with the highest combined technical and financial score</li><li>The capabilities of the manufacturers and subcontractors proposed in its Bid to be used by the Bidder with the Most Advantageous Bid for identified major items of supply or services will also be evaluated for acceptability in accordance with Section III, Evaluation and Qualification Criteria.&nbsp; Their participation should be confirmed with a letter of intent between the parties, as needed.&nbsp; Should a manufacturer or subcontractor be determined to be unacceptable, the Bid will not be rejected, but the Bidder will be required to substitute an acceptable manufacturer or subcontractor without any change to the Bid price. Prior to signing the Contract, the corresponding Appendix to the Contract Agreement shall be completed, listing the approved manufacturers or subcontractors for each item concerned.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Employer&rsquo;s right to Accept Any Bid and to Reject Any or All Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer reserves the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids at any time prior to Contract Award, without thereby incurring any liability to Bidders. In case of annulment, all Bids submitted and specifically, Bid securities shall be promptly returned to the Bidders.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Standstill Period</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Contract shall not be awarded earlier than the expiry of the Standstill Period. The Standstill Period shall be ten (10) Business Days unless extended in accordance with ITB 45. The Standstill Period commences the day after the date the Employer has transmitted to each Bidder the Notification of Intention to Award the Contract. Where only one Bid is submitted, or if this contract is in response to an emergency situation recognized by the Bank, the Standstill Period shall not apply.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:350px; vertical-align:top; width:24%\"><ol><li><strong>Notification of Intention to Award </strong></li></ol></td><td style=\"height:350px; vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall send to each Bidder the Notification of Intention to Award the Contract to the successful Bidder. The Notification of Intention to Award shall contain, at a minimum, the following information:</li></ol></li><li>the name and address of the Bidder submitting the successful Bid;</li><li>the Contract price of the successful Bid;</li><li>the total combined score of the successful Bid;</li><li>the names of all Bidders who submitted Bids, and their Bid prices as readout, and as evaluated and technical score;</li><li>a statement of the reason(s) the Bid (of the unsuccessful Bidder to whom the notification is addressed) was unsuccessful;</li><li>the expiry date of the Standstill Period; and</li><li>instructions on how to request a debriefing and/or submit a complaint during the standstill period.</li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Award of Contract</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Award Criteria</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Subject to ITB 40, the Employer shall award the Contract to the successful Bidder. This is the Bidder whose Bid has been determined to be the Most Advantageous Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Notification of Award</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Prior to the date of expiry &nbsp;of the bid validity, and upon expiry of the Standstill Period, specified in ITB 41.1 or any extension thereof, and upon satisfactorily addressing any complaint that has been filed within the Standstill Period, the Employer shall notify the successful Bidder, in writing, that its Bid has been accepted. The notification of award (hereinafter and in the Contract Forms called the &ldquo;Letter of Acceptance&rdquo;) shall specify the sum that the Employer will pay the Contractor in consideration of the execution of the contract (hereinafter and in the Conditions of Contract and Contract Forms called &ldquo;the Contract Price&rdquo;).</li><li>Within ten (10) Business Days after the date of transmission of the Letter of Acceptance, the Employer shall publish the Contract Award Notice which shall contain, at a minimum, the following information:</li></ol></li><li>name and address of the Employer;</li><li>name and reference number of the contract being awarded, and the selection method used;</li><li>names of all Bidders that submitted Bids, and their Bid prices as read out at Bid opening, and as evaluated;</li><li>names of all Bidders whose Bids were rejected either as nonresponsive or as not meeting qualification criteria, or were not evaluated, with the reasons therefor;</li><li>the name of the successful Bidder, the final total contract price, the contract duration and a summary of its scope; and</li><li>successful Bidder&rsquo;s Beneficial Ownership Disclosure Form.<ol><li>The Contract Award Notice shall be published on the Employer&rsquo;s website with free access if available, or in at least one newspaper of national circulation in the Employer&rsquo;s Country, or in the official gazette.</li><li>Until a formal contract is prepared and executed, the Letter of Acceptance shall constitute a binding Contract</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Debriefing by the Employer</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>On receipt of the Employer&rsquo;s Notification of Intention to Award referred to in ITB 42, an unsuccessful Bidder has three (3) Business Days to make a written request to the Employer for a debriefing. The Employer shall provide a debriefing to all unsuccessful Bidders whose request is received within this deadline.</li><li>Where a request for debriefing is received within the deadline, the Employer shall provide a debriefing within five (5) Business Days, unless the Employer decides, for justifiable reasons, to provide the debriefing outside this timeframe. In that case, the standstill period shall automatically be extended until five (5) Business Days after such debriefing is provided.&nbsp; If more than one debriefing is so delayed, the standstill period shall not end earlier than five (5) Business Days after the last debriefing takes place. The Employer shall promptly inform, by the quickest means available, all Bidders of the extended standstill period.</li><li>Where a request for debriefing is received by the Employer later than the three (3)-Business Day deadline, the Employer should provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of Public Notice of Award of contract. Requests for debriefing received outside the three (3)-day deadline shall not lead to extension of the standstill period.&nbsp;</li><li>Debriefings of unsuccessful Bidders may be done in writing or verbally. The Bidder shall bear their own costs of attending such a debriefing meeting.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:90px; vertical-align:top; width:24%\"><ol><li><strong>Signing of Contract</strong></li></ol></td><td style=\"height:90px; vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall send to the successful Bidder the Letter of Acceptance including the Contract Agreement, and a request to submit the Beneficial Ownership Disclosure Form providing additional information on its beneficial ownership. The Beneficial Ownership Disclosure Form shall be submitted within eight (8) Business Days of receiving this request.</li><li>The successful Bidder shall sign, date and return to the Employer, the Contract Agreement within twenty-eight (28) days of its receipt.</li><li>Notwithstanding ITB 46.2 above, in case signing of the Contract Agreement is prevented by any export restrictions attributable to the Employer, to the country of the Employer, or to the use of the Plant and Installation Services to be supplied, where such export restrictions arise from trade regulations from a country supplying those Plant and Installation Services, the Bidder shall not be bound by its Bid, always provided, however, that the Bidder can demonstrate to the satisfaction of the Employer and of the Bank that signing of the Contact Agreement has not been prevented by any lack of diligence on the part of the Bidder in completing any formalities, including applying for permits, authorizations and licenses necessary for the export of the Plant and Installation Services under the terms of the Contract.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Performance Security</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Within twenty-eight (28) days of the receipt of the Letter of Acceptance from the Employer, the successful Bidder shall furnish the Performance Security in accordance with the General Conditions GCC 13.3, subject to ITB 38, using for that purpose the Performance Security Form included in Section X, Contract Forms, or another form acceptable to the Employer.&nbsp; If the Performance Security furnished by the successful Bidder is in the form of a bond, it shall be issued by a bonding or insurance company that has been determined by the successful Bidder to be acceptable to the Employer.&nbsp; A foreign institution providing a bond shall have a correspondent financial institution located in the Employer&rsquo;s Country, unless the Employer has agreed in writing that a correspondent financial institution is not required.</li><li>Failure of the successful Bidder to submit the above-mentioned Performance Security or sign the Contract shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security.&nbsp; In that event the Employer may award the Contract to the Bidder offering the next Most Advantageous Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Procurement Related Complaint</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The procedures for making a Procurement-related Complaint are as specified in the BDS.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:625px\"><tbody><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:none; border-right:none; border-top:none; width:625px\"><p><strong>Section II - Bid Data Sheet</strong></p><p>The following specific data for the Facilities to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; width:625px\"><p><strong>A.&nbsp; General</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 1.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The reference number of the Request for Bids (RFB) is: <strong><em>SZ-ECC-561950-CW-RFB</em></strong></p><p>The Employer is<strong><em>: Eswatini Electricity Company (EEC).</em></strong></p><p>The name of the RFB is: <strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></strong></p><p>The number and identification of lots (contracts)<em> </em>comprising this RFB is:<strong> <em>one (1)</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 1.2 (a)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p><strong><em>N/A</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 2.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Borrower is: <strong><em>Government of Kingdom of Eswatini</em></strong></p><p>Loan or Financing Agreement amount:<strong><em> US$90 million </em></strong></p><p>The name of the Project is: <strong><em>Accelerating Sustainable and Clean Energy Access Transformation (ASCENT) Eswatini</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Maximum number of members in the JV shall be: <strong><em>Three (3)</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.5</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A list of debarred firms and individuals is available on the Bank&rsquo;s external website: http://www.worldbank.org/debarr.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.11</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>This Bidding Process<strong><em> is not </em></strong>subject to prequalification.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; width:625px\"><p><strong>B.&nbsp; Bidding Document</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>For <strong><u>C</u></strong><strong><u>larification of Bid purposes</u></strong> only, the Employer&rsquo;s address is:</p><p>Attention: <strong><em>Mr. Bongani Chauke, Procurement Manager</em></strong></p><p>Address: <strong><em>Po Box 258</em></strong><em>, <strong>Head Office, Eluvatsini House,</strong></em></p><p>Floor/Room number<em>: <strong>Ground Floor </strong></em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>City:<em> <strong>Mbabane&nbsp; </strong></em></p><p>Country: <strong><em>Kingdom of Eswatini (Swaziland) </em></strong></p><p>Telephone: <strong>+268 2409 4065</strong></p><p>Electronic mail address: <em>bongani.chauke@eec.co.sz</em><em>&nbsp; and </em><em>thobeka.gama@eec.co.sz</em><em> </em></p><p>Requests for clarification should be received by the Employer no later than: <strong>12 October 2026.</strong></p><p>Web page:<em> </em>www.eec.co.sz</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.4</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A pre-bid meeting <strong><em>shall </em></strong>take place at the following date, time and place:</p><p>Date: &nbsp;10 September 2026</p><p>Time: 10h00 SAST</p><p>Place: <strong>Virtual</strong></p><p><strong><em>Join: </em></strong><em>https://teams.microsoft.com/meet/350969007718107?p=iaBABpQyLOD1SvWqoV</em><em> </em></p><p><em>Meeting ID: <strong>350 969 007 718 107</strong> </em></p><p><em>Passcode: <strong>vZ7TW3mc </strong></em></p><p>A non-compulsory site visit conducted by the Employer <strong><em>shall be on 17nth and 18nth September 2026</em></strong></p><p>Telephone: <strong>+268 2409 4062&nbsp; </strong></p><p>E-mail: thobeka.gama@eec.co.sz copied to bongani.chauke@eec.co.sz</p><p>Contact person/conference coordinator:<em> <strong>Ms. Thobeka Gama, Procurement Specialist</strong></em></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Employer shall not publish the Minutes of the pre-Bid meeting on the web page. However, the minutes of the pre-Bid meeting will be circulated to all bidders who have purchased the bidding document.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>C.&nbsp; Preparation of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 10.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The language of the Bid is: <strong><em>English</em></strong></p><p>All correspondence exchange shall be in <strong><em>English</em></strong> language.</p><p>Language for translation of supporting documents and printed literature is <strong>English</strong>.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:298px; vertical-align:top; width:109px\"><p><strong>ITB 11.2 (i)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:298px; vertical-align:top; width:517px\"><p>The Bidder shall submit the following additional documents in the Technical Part of its Bid:</p><p><strong>Code of Conduct for Contractor&rsquo;s Personnel (ES) </strong></p><p>The Bidder shall submit its Code of Conduct that will apply to Contractor&rsquo;s Personnel (as defined in Sub-Clause 1.1.17 of the General Conditions of Contract), to ensure compliance with the Contractor&rsquo;s Environmental and Social (ES) obligations under the Contract. The Bidder shall use for this purpose the Code of Conduct form provided in Section IV.&nbsp; No substantial modifications shall be made to this form, except that the Bidder may introduce additional requirements, including as necessary to take into account specific Contract issues/risks.</p><p>A satisfactory code of conduct will contain obligations on all Contractor&rsquo;s Personnel project staff (including sub-contractors and day workers) that are suitable to address the following issues, as a minimum.&nbsp; Additional obligations may be added to respond to particular concerns of the region, the location and the project sector or to specific project requirements.&nbsp; The code of conduct shall contain a statement that the term &ldquo;child&rdquo; / &ldquo;children&rdquo; means any person(s) under the age of 18 years.</p><p>The issues to be addressed include:</p><p>1.&nbsp;&nbsp; Compliance with applicable laws, rules, and regulations.</p><p>2.&nbsp;&nbsp; Compliance with applicable health and safety requirements to protect the local community, the Employer&rsquo;s Personnel, and the Contractor&rsquo;s Personnel</p><p>3.&nbsp;&nbsp; Interactions with the local community(ies), members of the local community (ies), and any affected person(s) (for example to convey an attitude of respect, including to their culture and traditions)</p><p>4.&nbsp;&nbsp; Sexual harassment</p><p>5.&nbsp;&nbsp; Sexual exploitation and abuse</p><p>6.&nbsp;&nbsp; Protection of children (including prohibitions against sexual activity or abuse, or otherwise unacceptable behavior towards children, limiting interactions with children, and ensuring their safety in project areas)</p><p>7.&nbsp;&nbsp; Sanitation requirements</p><p>8.&nbsp;&nbsp; Non retaliation against workers who report violations of the Code, if that report is made in good faith.</p><p><strong>Management Strategies and Implementation Plans (MSIP) to manage the (ES) risks</strong></p><p>The Bidder shall submit<em> </em>Management Strategies and Implementation Plans (MSIPs) to manage the following key Environmental and Social (ES) risks:</p><ul><li>Gender Based Violence Action plan</li><li>Sexual Exploitation and Abuse (SEA) prevention and response action plan</li><li>Traffic Management Plan to ensure safety of local communities from construction traffic</li><li>Waste management plan</li></ul></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:109px\"><p><strong>ITB 11.3(d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:517px\"><p>The Bidder shall submit the following additional documents in the Financial Part of its Bid: <strong><em>N/A</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:109px\"><p><strong>ITB 13.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:517px\"><p>Alternative Bids <strong><em>shall not be </em></strong>considered.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:44px; vertical-align:top; width:109px\"><p><strong>ITB 13.2</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:44px; vertical-align:top; width:517px\"><p>Alternatives to the Time Schedule <strong>shall not</strong> be permitted.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:76px; vertical-align:top; width:109px\"><p><strong>ITB 13.4</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:76px; vertical-align:top; width:517px\"><p>Alternative technical solutions shall not be permitted for the Plant and Installation Services.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Bidders shall quote for the following components or services on a single responsibility basis:<em> </em></p><ul><li><em>Design, supply, installation, configuration and commissioning of all 13 x 11kV auto reclosers</em></li></ul><p><strong>and</strong></p><p>The supply of the following components or services will be provided under the responsibility of the Employer:</p><ul><li>Wooden structures and steel crossarms for each installation.</li><li>11kV/230 16kVA single phase transformer for auxiliary supply with corresponding surge protection, LV MCB in pole mounted box.</li><li>Bypass 11kV gang switch</li><li>Earthing material for all 13 sites<ul><li>Clamps</li><li>Earth spikes</li><li>Camo conductor</li><li>Lugs for camo conductor</li><li>Earthing wire</li><li>Conductive cement</li></ul></li></ul></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.5 (a) and (d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Place of destination: <strong>Matsapha Central Services Organization (CSO) &ndash; EEC Main Stores, Matsapha.</strong></p><p>Final destination (Project Site): Various projects sites across the country with 150 km radius from the Matsapha Central Services Organization (CSO) &ndash; EEC Main Stores, Matsapha.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Incoterms edition is: <strong>CIP</strong>-<strong>INCOTERMS 2020</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.7</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The prices quoted by the Bidder <strong><em>shall not </em></strong>be subject to adjustment during the performance of the Contract.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 18.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The currency of bid and payment for Bidder from the Common Monetary Area (CMA) Countries shall be Employer&rsquo;s Country Lilangeni (SZL).</p><p>Bidder from outside the Common Monetary Area (CMA) Countries <strong><em>is</em> not </strong>required to quote in the currency of the Employer&rsquo;s Country Lilangeni (SZL), the portion of the Bid price that corresponds to expenditures incurred in the Employer&rsquo;s Country currencies.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 19.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Bid shall be valid until: <strong>23 January 2027</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 19.3 (a)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Bid price shall be adjusted by the following factor(s): <strong>Not Applicable</strong>.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A Bid Security <strong>shall</strong> be required.</p><p>A Bid-Securing Declaration <strong>shall not</strong> be required.</p><p>If a Bid Security shall be required, the amount and currency of the Bid Security shall be <strong>&nbsp;E50,000.00</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.3 (d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Other types of acceptable securities:<strong> NONE</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.9</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p><strong><em>Not applicable</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 21.3</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The written confirmation of authorization to sign on behalf of the Bidder shall consist of <strong>&ldquo;Power of Attorney&rdquo;</strong> (either notarized or attested by the appropriate authority in the Bidder&rsquo;s home country) <strong>along with a copy of relevant Board Resolution.</strong></p><p>Note: The Power of Attorney shall indicate that the person signing the Bid has the authority to sign the Bid and the Bid is binding upon the Bidder during the full period of its validity. In case of a Joint venture Bid, the Power of Attorney shall be signed by the appropriate official of each of the JV partner.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>D.&nbsp; Submission and Opening of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB </strong><strong>22.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>In addition to the original Bid, the number of copies is: <strong>Two (2).</strong></p><p><strong>Notes: </strong></p><ol><li>Electronic copies of the bid shall also be submitted in Flash Drive in the technical proposal envelope.</li><li>The price schedule in MS-Excel format shall be submitted, in a separate flash drive in the financial proposal envelope. &nbsp;</li></ol></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB </strong><strong>23.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>For <strong>Bid submission purpose</strong> only, the Procuring Agency&rsquo;s address is:</p><p><strong>Eswatini Electricity Company</strong></p><p>Attention:<strong> Mr. Bongani Chauke</strong></p><p>Street Address:<strong> Eluvatsini House, Mhlambanyatsi Road&nbsp;&nbsp; </strong></p><p>Floor/ Room number:<strong> Reception&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>City: <strong>Mbabane</strong></p><p>Country: <strong>Kingdom of Eswatini</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong>The deadline for Bid submission is: </strong></p><p>Date: <strong>23 October 2026</strong></p><p>Time:<strong>11h00 SAST</strong></p><p>Bidders <strong>shall not</strong> have the option of submitting their Bids electronically.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>E. Public Opening of Technical Parts of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 26.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The <strong>Bid opening</strong> shall take place at:</p><p><strong>EEC Head Office</strong></p><p>Street Address:<strong> Eluvatsini House, Mhlambanyatsi Road</strong>&nbsp;&nbsp;</p><p>Floor/ Room number: <strong>Reception, Cubicle 1 </strong></p><p>City: <strong>Mbabane</strong></p><p>Country: <strong>Kingdom of Eswatini</strong></p><p>Date: <strong>&nbsp;23 October 2026</strong></p><p>Time: <strong>11.15 AM SAST</strong></p><p>The <strong>electronic Bid opening</strong> procedures shall be: <strong>N/A</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 26.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Letter of Bid - Technical Part and the sealed envelope marked &ldquo;Second Envelope - Financial Part&rdquo; shall be initialed by at least three (3) representatives of the Employer conducting Bid opening.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:39px; vertical-align:top; width:625px\"><p><strong>G.&nbsp; Evaluation of Technical Part of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 32.2</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The weight to be given for Rated Criteria (including technical and non-price factors) is: <strong>0.5</strong>(<strong><em>50 %)</em></strong><em> </em></p><p>The technical factors and sub-factors, which for purposes of this document carry the same meaning as Rated Criteria, and the corresponding scores in % are:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:483px\"><tbody><tr><td style=\"background-color:#92d050; width:42px\"><p><strong>No.</strong></p></td><td style=\"background-color:#92d050; width:93px\"><p><strong>Rated Criterion</strong></p></td><td style=\"background-color:#92d050; width:65px\"><p><strong>Weight</strong></p></td><td style=\"background-color:#92d050; vertical-align:top; width:283px\"><p><strong>Subfactors and weight</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px inset; border-left:1px solid black; border-right:1px solid black; border-top:none; width:42px\"><p>1</p></td><td style=\"background-color:white; border-bottom:1px inset; border-left:none; border-right:1px solid black; border-top:none; width:93px\"><p><strong>Specific Experience of bidder, capability and suitability of subcontractors</strong></p></td><td style=\"background-color:white; border-bottom:1px inset; border-left:none; border-right:1px solid black; border-top:none; width:65px\"><p><strong>15</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Relevant similar project experience [5]</li><li>Bidder capability, resources and delivery record [4]</li><li>Subcontractor suitability, experience and assigned scope [4]</li><li>Local/regional support and service capability [2]</li></ul></td></tr><tr><td style=\"width:42px\"><p>2</p></td><td style=\"width:93px\"><p><strong>Technical compliance and plant design solution</strong></p></td><td style=\"width:65px\"><p><strong>25</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Compliance with and level of exceeding employer&rsquo;s technical requirements [10]</li><li>Soundness of plant design basis and process solution efficiency [5]</li><li>Equipment selection, quality and standards compliance and superiority [5]</li><li>System integration, reliability, maintainability and operability exceeding generic standards [5]</li></ul></td></tr><tr><td style=\"width:42px\"><p>3</p></td><td style=\"width:93px\"><p><strong>Approach, Methodology, method statement and implementation plan</strong></p></td><td style=\"width:65px\"><p><strong>20</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Execution approach, procurement and logistics plan [5]</li><li>Detailed method statement and installation sequence [5]</li><li>Implementation plan, interfaces and outage management [4]</li><li>Quality control, inspection, testing and commissioning strategy [3]</li><li>Risk management, safety, environmental and social controls [3]</li></ul></td></tr><tr><td style=\"width:42px\"><p>4</p></td><td style=\"width:93px\"><p><strong>Key personnel and project organization</strong></p></td><td style=\"width:65px\"><p><strong>20</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Project manager qualifications, experience and availability [3]</li><li>Key technical personnel qualifications and relevant experience [7]</li><li>Project organization structure and reporting lines [3]</li><li>Clarity of roles, responsibilities and resource allocation [3]</li><li>Local/regional support and specialist backup [4]</li></ul></td></tr><tr><td style=\"width:42px\"><p>5</p></td><td style=\"width:93px\"><p><strong>Programme, schedule and delivery plan</strong></p></td><td style=\"width:65px\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Completeness and realism of programme [2]</li><li>Critical path, milestones and interface alignment [2]</li><li>Resource loading, float and recovery measures [1]</li></ul></td></tr><tr><td style=\"width:42px\"><p>6</p></td><td style=\"width:93px\"><p><strong>Cybersecurity risk management and innovation</strong></p></td><td style=\"width:65px\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Cybersecurity risk assessment and mitigation controls [2]</li><li>Protection of automation, control, communications and remote access systems [1]</li><li>Alignment with recognized industrial cybersecurity practices [1]</li><li>Innovation that improves safety, reliability or maintainability [1]</li></ul></td></tr><tr><td style=\"width:42px\"><p>7</p></td><td style=\"width:93px\"><p><strong>Training, documentation, warranties and lifecycle support</strong></p></td><td style=\"width:65px\"><p><strong>10</strong></p></td><td style=\"border-bottom:1px solid #9cc2e5; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Training plan, content and knowledge transfer [3]</li><li>Operation and maintenance documentation [2]</li><li>Spare parts strategy and lifecycle support [3]</li><li>Warranty, after-sales service and defects liability support [2]</li></ul></td></tr><tr><td colspan=\"2\" style=\"background-color:#92d050; width:135px\"><p><strong>Total</strong></p></td><td style=\"background-color:#92d050; width:65px\"><p><strong>100</strong></p></td><td style=\"vertical-align:top; width:283px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"background-color:yellow; width:135px\"><p><strong>Minimum Acceptable Score for Technical Proposal&nbsp; </strong></p></td><td style=\"background-color:yellow; width:65px\"><p><strong>70</strong></p></td><td style=\"vertical-align:top; width:283px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>Note:</em></strong></p><ol><li><strong><em>Bidders who attain a score less than 70 shall not be considered for financial evaluation.</em></strong></li><li><strong><em>Rated Criteria, including technical and non-price factors, will be assessed for bids that meet the minimum qualification requirements and pass the pass/fail evaluation stage. This assessment focuses not on meeting minimum standards, but on the extent to which bids exceed them by adding value to the contract and introducing innovations that enhance contract performance outcomes.</em></strong></li></ol></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>H. Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 33.5</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Letter of Bid &ndash; Financial Part and Schedules shall<em> </em>be initialed by three (3) representatives of the Employer conducting Bid opening<em>.&nbsp; &nbsp;</em></p><p>Each Financial Part of Bid shall be initialed by 3 representatives of the employer conducting the financial opening. Any modification to the total price shall be recorded and initialed by 3 Representatives of the Employer.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>I.&nbsp; Evaluation of Financial Part of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>36.1(f) </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The adjustments shall be determined using the following criteria, from amongst those set out in Section III, Evaluation and Qualification Criteria:</p><ol><li>Deviation in Time for Completion: <strong><em>No</em></strong></li><li>Life cycle costs: the projected operating and maintenance costs during the life of the Facilities: <strong><em>No</em></strong></li><li>Functional Guarantees of the Facilities<strong><em>: No</em></strong></li><li>Work, services, facilities, etc., to be provided by the Employer: <strong>No</strong></li></ol></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 36.2</strong></p><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The currency that shall be used for Bid evaluation and comparison purposes to convert at the selling exchange rate all Bid prices expressed in various currencies into a single currency is: <strong><em>Lilangeni (SZL)</em></strong></p><p>The source of exchange rate shall be: <strong><em>Central Bank of Eswatini</em></strong></p><p>The date for the exchange rate shall be<em>: <strong>&nbsp;23 October 2026</strong></em></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>J. Evaluation of Combined Technical and Financial Parts and Most Advantageous Bid</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 39.1 </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The weight to be given for cost is: <strong>0.5 (50%)</strong></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>K. Award of Contract</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 48.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The procedures for making a Procurement-related Complaint are detailed in the &ldquo;Procurement Regulations for IPF Borrowers (Annex III).&rdquo; If a Consultant wishes to make a Procurement-related Complaint, the Consultant shall submit its complaint following these procedures, In Writing (by the quickest means available, such as by email or fax), to:</p><p><strong>For the attention</strong>: Mr. Mphumuzi Maziya</p><p><strong>Title/position</strong>:<em> Managing Director</em></p><p><strong>Client</strong>: <em>Eswatini Electricity Company</em></p><p><strong>Email address</strong><em>: </em><em>mphumuzi.maziya@eec.co.sz</em><em> copied </em><em>bongani.chauke@eec.co.sz</em><em> </em></p><p>A copy of the complaint can be sent for the Bank&rsquo;s information and monitoring to:<strong> </strong><strong>pprocurementcomplaints@worldbank.org</strong></p><p>In summary, a Procurement-related Complaint may challenge any of the following:</p><ol><li>the terms of this Request for Proposal;</li><li>the Client&rsquo;s decision to award the contract.</li></ol></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section III - Evaluation and Qualification Criteria (Without prequalification)</strong></p><p>This section contains all the criteria that the Employer shall use to evaluate Bids and qualify Bidders. No other factors, methods or criteria shall be used other than specified in this Bidding document. The Bidder shall provide all the information requested in the forms included in Section IV, Bidding Forms.</p><p>Wherever a Bidder is required to state a monetary amount, Bidders should indicate the USD equivalent using the rate of exchange determined as follows:</p><ul><li>For turnover or financial data required for each year - Exchange rate prevailing on the last day of the respective calendar year (in which the amounts for that year is to be converted) was originally established.</li><li>Value of single contract - Exchange rate prevailing on the date of the contract.</li></ul><p>Exchange rates shall be taken from the publicly available source identified in the ITB 36.2. Any error in determining the exchange rates in the Bid may be corrected by the Employer.</p><p><strong>Table of Contents</strong></p><p>&nbsp;</p><p><strong>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualification. 61</strong></p><p><strong>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Technical Part 62</strong></p><p><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Financial Part 64</strong></p><p><strong>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Combined Evaluation. 66</strong></p><p><strong>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Multiple Contracts. 66</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Qualification </strong></li></ol><p><strong>1.1</strong><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualification Requirements</strong></p><p>The Bidder&rsquo;s qualification shall be assessed in accordance with the Qualification table included in this section.</p><p><strong>1.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Representative and other Key Personnel</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder must demonstrate that it will have suitably qualified Contractor&rsquo;s Representative and other suitably qualified (and in adequate numbers) key personnel, as described in the Employer&rsquo;s Requirements.</p><p>The Bidder shall provide details of the Contractor&rsquo;s Representative and other key personnel, and such other key personnel that the Bidder considers appropriate, together with their academic qualifications and work experience. The Bidder shall complete the relevant Forms in Section IV, Bid Forms.</p><p><strong>1.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder must demonstrate that it will have access to the key equipment required to perform the contract.</p><p>The Bidder shall provide further details of proposed items of equipment using the relevant Form in Section IV.</p><p><strong>1.4&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Subcontractors/Manufacturers</strong></p><p>Subcontractors/manufacturers for major items of supply or services identified in the Initial Selection document must meet or continue to meet the minimum criteria specified therein for each item.</p><p>Subcontractors for the following additional major items of supply or services must meet the following minimum criteria, herein listed for that item:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:511px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; width:42px\"><p><strong>Item No.</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:244px\"><p><strong>Description of Item</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:225px\"><p><strong>Minimum Criteria to be met</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Telecommunication equipment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>5 years&rsquo; experience in supplying and installing telecommunication equipment</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Overhead line construction</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>5 years&rsquo; experience in distribution infrastructure construction</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>11kV Auto reclosers</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>10 years&rsquo; experience in the manufacturing of auto reclosers</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Protection and SCADA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>10 Years experience in protection and automation of electrical transmission or distribution systems</p></td></tr></tbody></table><p>&nbsp;</p><p>Failure to comply with this requirement will result in rejection of the subcontractor.</p><p>In the case of a Bidder who offers to supply and/or install Plant and equipment under the contract that the Bidder did not manufacture or otherwise produce and/or install, the Bidder shall provide the <strong>manufacturer&rsquo;s authorization</strong>, using the form provided in Section IV, showing that the Bidder has been duly authorized by the manufacturer or producer of the related Plant and equipment or component to supply and/or install that item in the Employer&rsquo;s country. The Bidder is responsible for ensuring that the manufacturer or producer complies with the requirements of <strong>ITB 4</strong> and <strong>ITB 5</strong> and meets the minimum criteria listed above for that item.</p><ol><li><strong>Evaluation of Technical Part </strong></li></ol><p>The total technical points assigned to each Bid in the Evaluated Bid &nbsp;Formula will be determined by adding and weighting the scores assigned by an evaluation committee to technical factors of the Bid &nbsp;in accordance with the criteria set forth below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:671px\"><tbody><tr><td style=\"background-color:#92d050\"><p><strong>No.</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Rated Criterion</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Weight</strong></p></td><td style=\"background-color:#92d050; width:400px\"><p><strong>Key Assessment Considerations</strong></p></td></tr><tr><td style=\"background-color:white\"><p>1</p></td><td style=\"background-color:white\"><p>Specific Experience of bidder, capability and suitability of subcontractors</p></td><td style=\"background-color:white\"><p>15%</p></td><td style=\"background-color:white; width:400px\"><ul><li>Demonstrated experience of the bidder in successfully completing similar assignment</li><li>Relevance of previous projects in terms of plant type, capacity, complexity, technology, operating environment and contract scope.</li><li>Evidence of successful delivery within agreed time, cost, quality, safety and performance requirements.</li><li>Suitability, capability and experience of proposed subcontractors for their assigned scope of work.</li><li>Clarity of subcontractor roles, responsibilities, interfaces and reporting arrangements.</li></ul><ul><li>Evidence that subcontractors have the required technical qualifications, resources, certifications, equipment and specialist expertise.</li><li>Prior working relationship between the main bidder and proposed subcontractors, including evidence of successful collaboration on similar projects.</li></ul><ul><li>Availability of local or regional support, service capability, spare parts access and specialist backup during implementation and defects liability period.</li></ul></td></tr><tr><td><p>2</p></td><td><p>Technical compliance and plant design solution</p></td><td><p>25%</p></td><td style=\"width:400px\"><ul><li>Compliance with employer&rsquo;s requirements;</li><li>process design basis; performance guarantees; equipment selection; system integration; reliability, maintainability and operability; interfaces with existing infrastructure;</li><li>compliance with applicable standards.</li></ul></td></tr><tr><td><p>3</p></td><td><p>Approach, Methodology, method statement and implementation plan</p></td><td><p>20%</p></td><td style=\"width:400px\"><ul><li>Clarity and completeness of execution approach procurement and logistics plan</li><li>installation sequence; construction methodology detailed method statement; implementation plan; quality control;</li><li>inspection and test plans</li><li>commissioning strategy;</li><li>outage/interface management;</li><li>Completeness of project risk management</li><li>safety, environmental &amp; social risk controls.</li></ul></td></tr><tr><td><p>4</p></td><td><p>Key personnel and project organization</p></td><td><p>20%</p></td><td style=\"width:400px\"><ul><li>Qualifications,</li><li>relevant experience and availability of proposed personnel</li><li>strength of project management structure</li><li>clarity of roles and responsibilities</li><li>&nbsp;experience in similar plant design, supply and installation contracts</li><li>Loca/regional support and specialist backup.</li></ul></td></tr><tr><td><p>5</p></td><td><p>Programme, schedule and delivery plan</p></td><td><p>5%</p></td><td style=\"width:400px\"><ul><li>Completeness of the programme</li><li>critical path identification</li><li>engineering, procurement, manufacturing, delivery, installation, testing and commissioning timelines</li><li>resource loading; milestone alignment; float and recovery measures.</li></ul></td></tr><tr><td><p>6</p></td><td><p>Cybersecurity risk management and innovation</p></td><td><p>5%</p></td><td style=\"width:400px\"><ul><li>Assessment and management of cyber risks affecting plant automation, control, communications, remote access, vendor access, software, firmware, data integrity and operational continuity;</li><li>alignment with recognized industrial control system cybersecurity practices;</li><li>practical innovations that reduce cyber risk without compromising plant safety, reliability or maintainability.</li><li>Compliance with cybersecurity requirements</li></ul></td></tr><tr><td><p>7</p></td><td><p>Training, documentation, warranties and lifecycle support</p></td><td><p>10%</p></td><td style=\"width:400px\"><ul><li>Completeness of training plan and content; operation and maintenance documentation;</li><li>spare parts strategy and warranty support; after-sales service; regional maintenance capability; defects liability support.</li></ul></td></tr><tr><td><p><strong>Total</strong></p></td><td>&nbsp;</td><td><p><strong>100%</strong></p></td><td style=\"width:400px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>TECHINICAL PART SCORING METHOLOGY</strong></p><p>Evaluators will apply the following scoring guidance consistently to each rated criterion. Scores will be based on the extent to which the bidder&rsquo;s submission demonstrates compliance, completeness, relevance, credibility of evidence, and practical suitability for the required scope of work.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:101.1%\"><tbody><tr><td style=\"background-color:#92d050\"><p><strong>Score</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Rating</strong></p></td><td style=\"background-color:#92d050; width:74%\"><p><strong>General Scoring Guidance</strong></p></td></tr><tr><td><p>0</p></td><td><p>Non-responsive / No evidence</p></td><td style=\"width:74%\"><p>The submission does not address the criterion, provides no relevant evidence, or contains information that is materially non-compliant with the requirements. The response gives the evaluator no reasonable basis to confirm capability, compliance, or suitability.</p></td></tr><tr><td><p>1</p></td><td><p>Poor</p></td><td style=\"width:74%\"><p>The submission addresses the criterion only superficially or partially. Evidence is weak, generic, insufficient, incomplete, or not clearly relevant to the required scope. There are significant gaps, uncertainties, or weaknesses that may create delivery, compliance, performance, safety, operational, or support risks.</p></td></tr><tr><td><p>2</p></td><td><p>Acceptable</p></td><td style=\"width:74%\"><p>The submission adequately addresses the criterion and demonstrates basic compliance with the requirements. Evidence is generally relevant and sufficient, although some details may be missing or not fully developed. Any minor weaknesses are manageable and are not expected to materially affect delivery of the required scope.</p></td></tr><tr><td><p>3</p></td><td><p>Good</p></td><td style=\"width:74%\"><p>The submission addresses the criterion clearly and comprehensively. Evidence is relevant, credible, and well aligned with the requirements. The response demonstrates sound understanding, suitable capability, and a practical approach marginally exceeding minimum or generic standards. Even if there are very minor omissions or risks that can be readily clarified or managed.</p></td></tr><tr><td><p>4</p></td><td><p>Excellent</p></td><td style=\"width:74%\"><p>The submission fully addresses the criterion and exceeds the minimum requirements in a meaningful and relevant way. Evidence is strong, specific, verifiable, and directly applicable to the scope. The response demonstrates superior capability, robust risk controls, clear interfaces, reliable delivery arrangements, and added value without introducing unacceptable risk.</p></td></tr></tbody></table><p>&nbsp;</p><p>The score for each sub- factor (i) within a factor (j) will be combined with the scores of sub- factors in the same factor as a weighted sum to form the Factor Technical Score using the following formula:</p><p>&nbsp;</p><p>where:</p><p><em>tji&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>= the technical score for sub- factor &ldquo;i&rdquo; in factor &ldquo;j&rdquo;</p><p><em>wji</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the weight of sub- factor &ldquo;i&rdquo; in factor &ldquo;j&rdquo;,</p><p><em>k</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the number of scored sub-factors in factor &ldquo;j&rdquo;</p><p>and&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;</p><p>The Factor Technical Scores will be combined in a weighted sum to form the total Technical Part Score using the following formula:</p><p>&nbsp;</p><p>where:</p><p><em>Sj</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the Factor Technical Score of factor &ldquo;j&rdquo;</p><p><em>Wj</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the weight of factor &ldquo;j&rdquo; as specified in the BDS</p><p><em>n</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the number of Factors</p><p>and&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong><em>Note: After the technical evaluation only, only bids that attains a score of 70 % and or above shall be considered for financial evaluation.</em></strong></p><p>&nbsp;</p><ol><li><strong>Evaluation of Financial Part</strong></li></ol><p>The following factors and methods will apply:</p><ol><li><ol><li><strong>Time Schedule</strong></li></ol></li></ol><p>Time to complete the Plant and Installation Services from the effective date specified in Article 3 of the Contract Agreement for determining time for completion of pre-commissioning activities is 6 months. No credit will be given for earlier completion.</p><p>&nbsp;</p><p>Note: A compliant Bid must offer a contract completion within the time specified above. Bids offering a completion date beyond the maximum designated period shall be rejected as non-responsive.</p><p>&nbsp;</p><ol><li><ol><li><strong>Life Cycle Costs </strong></li></ol></li></ol><p><strong>None</strong></p><p>&nbsp;</p><ol><li><ol><li><strong>Functional Guarantees of the Facilities</strong></li></ol></li></ol><p>The minimum requirements stated in the Specification for functional guarantees required in the Specification are:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:499px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:181px\"><p><strong>Functional Guarantee</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:318px\"><p><strong>Minimum (or Maximum, as appropriate) Requirement </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:181px\"><p>1. All 11 kV auto reclosers as stated in the employer&rsquo;s requirements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:318px\"><p>100% operational functionality throughout the Warranty Period &amp; Design Life.</p></td></tr></tbody></table><p>&nbsp;</p><p>The performance figures quoted on forms-FUNC and Technical Data Sheet shall be guaranteed within the tolerances permitted by relevant standards listed under Part-II, Employer&rsquo;s Requirement, and shall become a part of the successful Bidder&#39;s Contract. For the purposes of evaluation, for each percentage point the functional guarantee of the proposed Plant and Installation Services is below the norm specified in the Specification and in the above table, but above the minimum acceptable levels also specified therein, an adjustment of 5% will be added to the Bid price.&nbsp; If the drop below the norm the Auto reclosers will be rejected.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><strong>&nbsp;Sustainable Procurement</strong></li></ol></li></ol><p><strong><em>None</em></strong></p><p>&nbsp;</p><ol><li><ol><li><strong>Work, services, facilities, etc., to be provided by the Employer</strong></li></ol></li></ol><p><strong>None</strong></p><p>&nbsp;</p><ol><li><strong>Combined Evaluation </strong></li></ol><p>The Employer will evaluate and compare the Bids that have been determined to be substantially responsive.</p><p>An Evaluated Bid Score (B) will be calculated for each responsive Bid using the following formula, which permits a comprehensive assessment of the evaluated cost and the technical merits of each Bid:</p><p>&nbsp;</p><p>where</p><p><em>C</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluated Bid Cost</p><p><em>C low</em> =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the lowest of all Evaluated Bid Costs among responsive Bids</p><p><em>T</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the total Technical Score awarded to the Bid</p><p><em>Thigh</em>&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the Technical Score achieved by the Bid&nbsp; that was scored best among all responsive Bids</p><p><em>X</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; weight for Cost as <strong>specified in the BDS</strong></p><p>The Bid with the best evaluated Bid Score (B) among responsive Bids shall be the Most Advantageous Bid provided the Bidder is qualified to perform the Contract.</p><p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>2. Qualification </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:145px\"><p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:690px\"><p><strong>1 Eligibility</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:145px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:570px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:120px\"><p><strong>Documentation Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:188px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:382px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:290px\"><p><strong>Joint Venture</strong>(existing or intended)</p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:98px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:91px\"><p><strong>Each Partner</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:101px\"><p><strong>At least one Partner</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.1 Nationality</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Nationality in accordance with ITB 4.4.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Form ELI &ndash;1.1 and 1.2, with attachments</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.2 Conflict of Interest</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>No- conflicts of interests as described in ITB 4.2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.3 Bank Ineligibility</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Not having been declared ineligible by the Bank as described in 4.5.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.4 State Owned Enterprise or Institution</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Compliance with conditions of ITB 4.6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:98px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Form ELI&nbsp; &ndash;1.1 and 1.2, with attachments</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.5 Ineligibility based on a United Nations resolution or Borrower&rsquo;s country law</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Not having been excluded as a result of the Borrower&rsquo;s country laws or official regulations, or by an act of compliance with UN Security Council resolution, in accordance with ITB 4.8and Section V.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:148px\"><br /><br />&nbsp;<p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:700px\"><p><strong>2. Historical Contract Non-Performance</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:148px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:576px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:124px\"><p><strong>Documentation&nbsp; Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:186px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:104px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:286px\"><p><strong>Joint Venture (existing or intended)</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p><strong>At least one member</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.1 History of non-performing contracts</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Non-performance[1]of a contract did not occur within the last <strong>5</strong> years prior to the deadline for application submission, based on all information on fully settled disputes or litigation.&nbsp; A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the Bidder have been exhausted.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement by itself or as member to past or existing JV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement[2]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON - 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.2 Suspension</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>&nbsp;Not under suspension based on execution of a Bid Securing Declaration or Proposal Securing Declaration pursuant to ITB 4.7 and ITB 20.9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.3 Pending Litigation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Bid&rsquo;s financial position and prospective long term profitability still sound according to criteria established in 3.1 below and assuming that all pending litigation will be resolved against the Bidder</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON &ndash; 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.4 Litigation History</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>No consistent history of court/arbitral&nbsp; award decisions against the Bidder[3]since 1st January <em>2021</em></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON &ndash; 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.5 Declaration: Environmental and Social (ES) past performance</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Declare any contract that has been suspended or terminated and/or performance security called by an employer for reasons of breach of environmental, or social (including Sexual Exploitation, and Abuse) contractual obligations in the past five years.[4]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must make the declaration. Where there are Specialized Subcontractor/s, the Specialized Subcontractor/s must also make the declaration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Each must make the declaration. Where there are Specialized Subcontractor/s, the Specialized Subcontractor/s must also make the declaration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON-3 ES Performance Declaration</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.6 Bank&rsquo;s SEA and/or SH Disqualification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>At the time of Contract Award, not subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p><p>(including each subcontractor proposed by the Bidder)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement (including each subcontractor proposed by the Bidder)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Letter of Bid, Form CON-4</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td colspan=\"2\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:146px\"><p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:700px\"><p><strong>3 Financial Situation</strong></p></td></tr><tr><td colspan=\"2\" rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:146px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:126px\"><p><strong>Documentation Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:186px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:388px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p><strong>Joint Venture (existing or intended)</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; width:96px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:99px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:94px\"><p><strong>At least one member</strong></p></td></tr></thead><tbody><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:146px\"><p>3.1 Financial Capabilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:186px\"><p>Submission of audited balance sheets or if not required by the law of the Bidder&rsquo;s Country, other financial statements acceptable to the Employer, for the last <strong>three [3]</strong> years to demonstrate the current soundness of the Bidders financial position and its prospective long-term profitability.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:99px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:126px\"><p>Form FIN &ndash; 3.1 with attachments</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:146px\"><p>3.2 Average Annual Turnover</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:186px\"><p>Minimum average annual construction turnover in supply and installation of electricity distribution infrastructure of <strong>US$ 1,720,000.00 (One million, seven hundred and twenty thousand)</strong>, calculated as total certified payments received for contracts in progress and/or completed within the last three (3) years,</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:99px\"><p>Must meet <strong>at least 30 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:94px\"><p>Must meet <strong>at</strong> <strong>least 70 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:126px\"><p>Form FIN &ndash;3.2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:144px\"><p>3.3 Financial Resources</p><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:188px\"><p>The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet:</p><p>(i) the following cash-flow requirement:</p><p><strong>USD $ 430,000.00 (four hundred and thirty thousand)</strong></p><p>and</p><p>(ii) the overall cash flow requirements for this contract and its current commitments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:99px\"><p>Must meet <strong>at least 30 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:94px\"><p>Must meet <strong>at</strong> <strong>least 70 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:126px\"><p>Form FIN &ndash;3.3</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:78px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:128px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:81px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:123px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:876px\"><thead><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:133px\"><p><strong>Factor</strong></p></td><td colspan=\"7\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:743px\"><p><strong>4 Experience</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:133px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:628px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:114px\"><p><strong>Documentation Required</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:198px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p><strong>Bidder</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:96px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:334px\"><p><strong>Joint Venture (existing or intended)</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><strong>At least one member</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.1 General Experience</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Experience in supply, installation and commissioning of electricity<em> distribution control systems</em> under contracts in the role of main <em>contractor</em>, JV member, subcontractor, or management contractor for at least the last <strong><em>five (5</em></strong><em>) </em>years starting 1st January <em>2021</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP-4.1</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2(a) Specific Experience</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>(a)Participation as contractor, joint venture member[5], management contractor, or subcontractor, in at least two (2) contracts within the last eight (8) years (from 1 January 2018), each with a value of at least<strong> $860,000.00 </strong>that have been successfully and substantially[6]completed and that are similar to the proposed Plant and Installation Services.</p><p>The similarity of the contracts shall be based on the physical size, complexity, methods, technology or other characteristics as described in Section VII, Employer&rsquo;s Requirements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements[7]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>Must meet the following requirements for the key activities listed below</p><ul><li>2 contracts for Supply, Installation and commissioning of 11 to 33 kV auto-reclosers/circuit breakers in Sub-Sahara countries.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP 4.2(a)</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2(b)&nbsp; Specific Experience </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>(b) For the above or other contracts executed during the period stipulated in 4.2(a) above, a minimum experience in the following key activities:</p><ul><li>Design, Supply, Installation, and Commissioning of at least two [2] of 11 to 33 kV auto-reclosers/circuit breakers within the last five [5] years; and</li><li>&nbsp;At least one of the contracts shall have the complete scope of installation/integration to SCADA in a Sub-Sahara Africa</li></ul><p>Bidders should submit details of previous projects and reference letters from clients in support of the projects they are using to demonstrate their qualifications.</p><p>The Employer may make independent inquiries about any or all of the projects referenced by bidders and may visit and examine the projects used by Bidders in support of their qualifications.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements[8]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>Must meet the requirements</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP-4.2(b)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2 (c) Specific Experience in managing ES aspects </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>For the contracts in 4.2 (a) above and/or any other contracts [substantially completed and under implementation] as prime contractor, joint venture member, or Subcontractor between 1st January <em>2021</em> and Application submission deadline, experience in managing ES risks and impacts in the following aspects:</p><ul><li>Health and Safety on project areas and working areas</li><li>ESHS training of Contractor &amp; local partners and staff; including induction training, health screening, training in correct use of PPEs, Project ESHS risks and hazards;</li><li>Waste management</li><li>Emergency Management</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N/A</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>N/A</p><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP &ndash; 4.2 (c)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:73px; width:613px\"><p><strong>Section IV - Bidding Forms</strong></p></td></tr></tbody></table><p><strong>Table of Forms</strong></p><p>&nbsp;</p><p><strong>Letter of Bid- Technical Part 79</strong></p><p><strong>Technical Proposal 82</strong></p><p>Site Organization. 83</p><p>Method Statement 84</p><p>Mobilization Schedule. 85</p><p>Construction Schedule. 86</p><p>ES Management Strategies and Implementation Plans (ES-MSIP) 87</p><p>Sustainable Procurement Proposal 88</p><p>Risk assessment and Proposed Management Plan. 89</p><p>Code of Conduct for Contractor&rsquo;s Personnel (ES) Form.. 90</p><p>Plant 94</p><p><strong>Contractor&rsquo;s Equipment 95</strong></p><p><strong>Functional Guarantees. 96</strong></p><p><strong>Personnel 97</strong></p><p>Resume of Proposed Personnel 99</p><p><strong>Proposed Subcontractors for Major Items of Plant and Installation Services. 100</strong></p><p><strong>Others - Time Schedule. 101</strong></p><p><strong>Bidders Qualification without prequalification. 115</strong></p><p><strong>Bidder Information Sheet 116</strong></p><p><strong>Party to JV Information Sheet 117</strong></p><p><strong>Historical Contract Non-Performance, Pending Litigation and Litigation History. 118</strong></p><p><strong>Current Contract Commitments / Works in Progress. 124</strong></p><p><strong>Financial Situation. 125</strong></p><p>Historical Financial Performance. 125</p><p>Average Annual Turnover 127</p><p>Financial Resources. 128</p><p><strong>Experience. 129</strong></p><p>General Experience. 129</p><p>Specific Experience. 131</p><p>Specific Experience in Key Activities. 133</p><p><strong>Form of Bid Security. 136</strong></p><p>Form of Bid Security &ndash; Bank Guarantee. 136</p><p>Form of Bid Security- Bid Bond. 138</p><p>Form of Bid-Securing Declaration. 139</p><p><strong>Manufacturer&rsquo;s Authorization. 140</strong></p><p><strong>Schedule of Rates and Prices. 143</strong></p><p>Schedule No. 1.&nbsp; Plant and Mandatory Spare Parts Supplied from Abroad. 143</p><p>Country of Origin Declaration Form.. 144</p><p>Schedule No. 2.&nbsp; Plant and Mandatory Spare Parts Supplied from Within the Employer&rsquo;s Country. 145</p><p>Schedule No. 3.&nbsp; Design Services. 146</p><p>Schedule No. 4.&nbsp; Installation and Other Services. 147</p><p>Schedule No. 5.&nbsp; Grand Summary. 148</p><p>Schedule No. 6.&nbsp; Recommended Spare Parts. 149</p><p><strong>Price Adjustment 150</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Letter of Bid- Technical Part</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:599px\"><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENT</em></p><p><em>The Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder&rsquo;s complete name and business address.</em></p><p><em><u>Note</u></em><em>: All italicized text is to help Bidders in preparing this form.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Date of this Bid submission</strong>: [<em>insert date (as day, month and year) of Bid submission</em>]</p><p><strong>RFB No.:</strong> [<em>insert number of RFB process</em>]</p><p><strong>Alternative No.</strong>:[<em>insert identification No if this is a Bid for an alternative</em>]</p><p>We, the undersigned, hereby submit our Bid, in two parts, namely:</p><ol><li>the Technical Part, and</li><li>the Financial Part</li></ol><p>In submitting our Bid, we make the following declarations:</p><ol><li><strong>No reservations:</strong> We have examined and have no reservations to the bidding document, including Addenda issued in accordance with Instructions to Bidders (ITB 8);</li><li><strong>Eligibility</strong>: We meet the eligibility requirements and have no conflict of interest in accordance with ITB 4;</li><li><strong>Bid-Securing Declaration:</strong> We have not been suspended nor declared ineligible by the Employer based on execution of a Bid-Securing Declaration or Proposal-Securing Declaration in the Employer&rsquo;s country in accordance with ITB 4.7;</li><li><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH):</strong> [<em>select the appropriate option from (i) to (v) below and delete the others</em>].</li></ol><p>We <em>[where JV, insert: </em>&ldquo;including any of our JV members&rdquo;<em>]</em>, and any of our subcontractors:</p><ol><li>[have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]</li><li>[are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations for a period of two years. We have subsequently provided and demonstrated that we have adequate capacity and commitment to comply with SEA and SH prevention and response obligations.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations for a period of two years. We have attached documents demonstrating that we have adequate capacity and commitment to comply with SEA and SH prevention and response obligations.]</li></ol><ol><li><strong>Conformity</strong>: We offer to provide design, supply and installation services in conformity with the bidding document of the following: [<em>insert a brief description of the Plant, Design, Supply and Installation Services</em>]<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>;</li><li><strong>Bid Validity</strong>: Our Bid shall be valid until <em>[insert day, month and year in accordance with ITB 19.1]</em>, and it shall remain binding upon us and may be accepted at any time on or before this date;</li><li><strong>Performance Security:</strong> If our Bid is accepted, we commit to obtain a Performance Security in accordance with the bidding document;</li><li><strong>One Bid Per Bidder: </strong>We are not submitting any other Bid(s) as an individual Bidder, and we<em> </em>are not participating in any other Bid(s) as a Joint Venture member, and meet the requirements of ITB 4.3, other than alternative Bids submitted in accordance with ITB 13;</li><li><strong>Suspension and Debarment</strong>: We, along with any of our subcontractors, suppliers, consultants, manufacturers, or service providers for any part of the contract, are not subject to, and not controlled by any entity or individual that is subject to, a temporary suspension or a debarment imposed by the World Bank Group or a debarment imposed by the World Bank Group in accordance with the Agreement for Mutual Enforcement of Debarment Decisions between the World Bank and other development banks. Further, we are not ineligible under the Employer&rsquo;s country laws or official regulations or pursuant to a decision of the United Nations Security Council;</li><li><strong>State-owned enterprise or institution:</strong> [<em>select the appropriate option and delete the other</em>] [<em>We are not a state-owned enterprise or institution</em>] / [<em>We are a state-owned enterprise or institution but meet the requirements of ITB 4.6</em>];</li><li><strong>Binding Contract</strong>: We understand that this Bid, together with your written acceptance thereof included in your Letter of Acceptance, shall constitute a binding contract between us, until a formal contract is prepared and executed;</li><li><strong>Not Bound to Accept:</strong> We understand that you are not bound to accept the lowest evaluated cost Bid, the Most Advantageous Bid or any other Bid that you may receive; and</li><li><strong>Fraud and Corruption:</strong> We hereby certify that we have taken steps to ensure that no person acting for us or on our behalf engages in any type of Fraud and Corruption.</li></ol><p>;</p><p><strong>Name of the Bidder</strong>: *[<em>insert complete name of the Bidder</em>]</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: **[<em>insert complete name of person duly authorized to sign the Bid</em>]</p><p><strong>Title of the person signing the Bid</strong>: [<em>insert complete title of the person signing the Bid</em>]</p><p><strong>Signature of the person named above</strong>: [<em>insert signature of person whose name and capacity are shown above</em>]</p><p><strong>Date signed</strong> [<em>insert date of signing</em>] <strong>day of</strong> [<em>insert month</em>], [<em>insert year</em>]</p><p><strong>*</strong>: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder</p><p>**: Person signing the Bid shall have the power of attorney given by the Bidder to be attached with the Bid</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Technical Proposal</strong></p></td></tr></tbody></table><p>&nbsp;</p><ul><li>Site Organization</li><li>Method Statement</li><li>Mobilization Schedule</li><li>Construction Schedule</li><li>ES Management Strategies and Implementation Plans</li><li>Sustainable Procurement Proposal</li><li>Risk Assessment and Proposed Management Plan</li><li>Code of Conduct for Contractor&rsquo;s Personnel (ES)</li><li>Plant</li><li>Contractor&rsquo;s Equipment</li><li>Personnel</li><li>Proposed Subcontractors for Major Items of Plant and Installation Services</li><li>Others</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Site Organization</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Method Statement</strong></p><p><em>[<strong>Note to the Bidder</strong>: (i) As required in BDS 11.2 (i), also include method statement, management strategies, implementation plans and innovations; (ii) if there are assessed supply chain risks, the method statement must include proposed supply chain risks management plans.]</em></p><p>In addition, the Bidder/Contractor shall establish, implement and maintain a Method Statement for its specific Occupational Health &amp; Safety (OHS) risks on site and describe mitigation measures to keep high risks under control. Method Statement is a type of health and safety document that Contractor shall use for high-risk work. It describes the steps (method) that workers must take to carry out a particular job safely. Primarily, they are for the benefit of those who will physically be carrying out the work, usually those working in the construction sector.</p><p>The document shall identify the potential hazards that may arise during a particular task and outline the necessary precautions that must be put in place and taken by workers. The statement must be as simple as possible to avoid any misinterpretations that could result in injury. Workers involved in the work shall read it, understand what is expected of them and follow the measures that are in place to keep them safe. Method Statement shall be approved by the Employer.</p><p>The Bidder/Contractor shall describe the method of work to keeping under control high risks and establish a permit to work system and issue a permit to work (PTW) for specific work. PTW shall be issued, but is not limited to, working at height, working in confined spaces, lone work, asbestos, hot work and the use of dangerous plant. Method Statements shall contain the following items but not limited to:</p><ul><li>Equipment, installation and machinery used;</li><li>Responsibilities (workforce) for carrying out the work;</li><li>Responsibility of Contractor&rsquo;s supervisor;</li><li>Identified specific hazards and risks and risk control;</li><li>Use of Personal Protective Equipment (PPE) on construction site;</li><li>Safety audit (before starting the job to check if comply with);</li><li>Workforce competence (name, surname and number of training certificate, etc.);</li><li>Subcontractors (if applicable);</li><li>Toolbox meeting and training (risks communication);</li><li>ES aspects and measures to mitigate E&amp;S impacts and risks;</li><li>Emergency arrangements and equipment needs;</li><li>Permit to Work;</li><li>Other specific issues which can appear in the process of work, etc.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Mobilization Schedule</strong></p><p><strong>[Insert Technical Proposal for Mobilization Schedule]</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Construction Schedule</strong></p><p>The Bidder should chalk out proper mobilisation schedule and construction schedule along with the CPM/ PERT charts for execution of the Contract as a whole. Since no extension of time is anticipated unless exclusively warranted under critical circumstances, work programme for all key activities that may have bearing on project implementation should be clearly shown within the overall project schedule. For example, time required for import of equipment and construction materials together with time schedule within the overall schedule for preconstruction activities like surveys and investigations and preparation of construction drawings.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ES Management Strategies and Implementation Plans (ES-MSIP)</strong></p><p>The Bidder shall submit comprehensive and concise Environmental and Social Management Strategies and Implementation Plans (ES-MSIP) as required by ITB 11.1 (j) of the Bid Data Sheet. These strategies and plans shall describe in detail the actions, materials, equipment, management processes etc. that will be implemented by the Contractor, and its subcontractors.</p><p>In developing these strategies and plans, the Bidder shall have regard to the ES provisions of the contract including those as may be more fully described in the Employer&rsquo;s Requirements in Section VII.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Sustainable Procurement Proposal</strong></p><p><strong><em>Note to Bidder</em></strong><em>: In addition to submitting the <strong>required</strong> </em>ES Management Strategies and Implementation Plans, <em>the Bidder shall provide its proposal to demonstrate how additional sustainable procurement requirements, if any, specified in Section VII- Employer&rsquo;s Requirements would be addressed. The Bidder shall also provide its proposal, if any, for exceeding the sustainable procurement requirements. </em></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Risk assessment and Proposed Management Plan </strong></p><p>The Bidder should submit a risk register identifying the hazards anticipated during the implementation of the contract.</p><p>For the key hazards ranked by impact, the risk register shall include a description of the hazard, an assessment of the potential impact on health and safety, environment, cost, program or other, and the proposed mitigation strategy for each hazard.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><strong>Note to the Bidder</strong>:</p><p><strong>The minimum content of the Code of Conduct form as set out by the Employer shall not be substantially modified</strong>. However, the Bidder may add requirements as appropriate, including to take into account Contract-specific issues/risks.&nbsp;</p><p>The Bidder shall initial and submit the Code of Conduct form as part of its bid.</p><p>&nbsp;</p></td></tr></tbody></table><p>Code of Conduct for Contractor&rsquo;s Personnel (ES) Form</p><table style=\"width:100%\"><tbody><tr><td><p><strong><em>Note to the Employer</em></strong><em>: </em></p><p><strong><em>The following minimum requirements shall not be modified</em></strong><em>. The Employer may add additional requirements to address identified issues, informed by relevant environmental and social assessment.</em></p><p><em>The types of issues identified could include risks associated with: labour influx, spread of communicable diseases, and </em>Sexual Exploitation and Abuse (SEA), Sexual Harassment (SH)<em> etc. </em></p><p><strong><em>Delete this Box prior to issuance of the bidding documents.</em></strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>We are the Contractor, [<em>enter name of Contractor</em>].&nbsp; We have signed a contract with [<em>enter name of Employer</em>] for [<em>enter description of the Facilities</em>]. The Plant for the Facilities will be installed at [<em>enter the Site]</em>. Our contract requires us to implement measures to address environmental and social risks, related to the Installation Services i.e. services ancillary to the supply of the Plant for the Facilities, such as inland transportation, site preparation works/ associated civil works, installation, testing, precommissioning, commissioning, operations and maintenance etc. as the case may require.</p><p>This Code of Conduct is part of our measures to deal with environmental and social risks related to the Installation Services.&nbsp;</p><p>All personnel that we utilize in the execution of the Contract, including staff, labor and other employees of us and of each Subcontractor, and any other personnel assisting us in the execution of the Contract, are referred to as Contractor&rsquo;s Personnel.</p><p>This Code of Conduct identifies the behavior that we require from the Contractor&rsquo;s Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located).</p><p>Our workplace is an environment where unsafe, offensive, abusive or violent behavior will not be tolerated and where all persons should feel comfortable raising issues or concerns without fear of retaliation.</p><p><strong>REQUIRED CONDUCT</strong></p><p>Contractor&rsquo;s&nbsp; Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located) shall:</p><ol><li>carry out his/her duties competently and diligently;</li><li>comply with this Code of Conduct and all applicable laws, regulations and other requirements, including requirements to protect the health, safety and well-being of other Contractor&rsquo;s Personnel and any other person;</li><li>maintain a safe working environment including by:<ol><li>ensuring that workplaces, machinery, equipment and processes under each person&rsquo;s control are safe and without risk to health;</li><li>wearing required personal protective equipment; &nbsp;&nbsp;</li><li>using appropriate measures relating to chemical, physical and biological substances and agents; and</li><li>following applicable emergency operating procedures.</li></ol></li><li>report work situations that he/she believes are not safe or healthy and remove himself/herself from a work situation which he/she reasonably believes presents an imminent and serious danger to his/her life or health;</li><li>treat other people with respect, and not discriminate against specific groups such as women, people with disabilities, migrant workers or children;</li><li>not engage in any form of sexual harassment including unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature with other Contractor&rsquo;s or Employer&rsquo;s Personnel;</li><li>not engage in Sexual Exploitation, which means any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another;</li><li>not engage in in Sexual Abuse,&nbsp; which means the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions;</li><li>not engage in any form of sexual activity with individuals under the age of 18, except in case of pre-existing marriage;</li><li>complete relevant training courses that will be provided related to the environmental and social aspects of the Contract, including on health and safety matters, and Sexual Exploitation and Abuse, and Sexual Harassment (SH);</li><li>&nbsp;report violations of this Code of Conduct; and</li><li>not retaliate against any person who reports violations of this Code of Conduct, whether to us or the Employer, or who makes use of the grievance mechanism for Contractor&rsquo;s Personnel or the project&rsquo;s Grievance Redress Mechanism.</li></ol><p><strong>RAISING CONCERNS </strong></p><p>If any person observes behavior that he/she believes may represent a violation of this Code of Conduct, or that otherwise concerns him/her, he/she should raise the issue promptly. This can be done in either of the following ways:</p><ol><li>Contact [<em>enter name of the Contractor&rsquo;s Social Expert with relevant experience in handling sexual exploitation, sexual abuse and sexual harassment cases, or if such person is not required under the Contract, another individual designated by the Contractor to handle these matters</em>] in writing at this address [&nbsp;&nbsp; ] or by telephone at [&nbsp;&nbsp; ] or in person at [&nbsp;&nbsp; ]; or</li><li>Call [&nbsp; ]&nbsp; to reach the Contractor&rsquo;s hotline <em>(if any)</em> and leave a message.</li></ol><p>&nbsp;</p><p>The person&rsquo;s identity will be kept confidential, unless reporting of allegations is mandated by the country law. Anonymous complaints or allegations may also be submitted and will be given all due and appropriate consideration. We take seriously all reports of possible misconduct and will investigate and take appropriate action. We will provide warm referrals to service providers that may help support the person who experienced the alleged incident, as appropriate.</p><p>There will be no retaliation against any person who raises a concern in good faith about any behavior prohibited by this Code of Conduct.&nbsp; Such retaliation would be a violation of this Code of Conduct.&nbsp;</p><p><strong>CONSEQUENCES OF VIOLATING THE CODE OF CONDUCT</strong></p><p>Any violation of this Code of Conduct by the Contractor&rsquo;s Personnel may result in serious consequences, up to and including termination and possible referral to legal authorities.</p><p>FOR CONTRACTOR&rsquo;s PERSONNEL:</p><p>I have received a copy of this Code of Conduct written in a language that I comprehend.&nbsp; I understand that if I have any questions about this Code of Conduct, I can contact [<em>enter name of Contractor&rsquo;s contact person(s) with relevant experience</em>] requesting an explanation.&nbsp;</p><p>Name of Contractor&rsquo;s Personnel: [insert name]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Signature: __________________________________________________________</p><p>Date: (day month year): _______________________________________________</p><p>Countersignature of authorized representative of the Contractor:</p><p>Signature: ________________________________________________________</p><p>Date: (day month year): ______________________________________________</p><p><strong>ATTACHMENT 1: </strong>Behaviors constituting SEA and behaviors constituting SH</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ATTACHMENT 1 TO THE CODE OF CONDUCT FORM</strong></p><p>&nbsp;</p><p><strong>BEHAVIORS CONSTITUTING SEXUAL EXPLOITATION AND ABUSE (SEA) AND BEHAVIORS CONSTITUTING SEXUAL HARASSMENT (SH)</strong></p><p>&nbsp;</p><p>The following non-exhaustive list is intended to illustrate types of prohibited behaviors.</p><ol><li><strong>Examples of sexual exploitation and abuse</strong> include, but are not limited to:</li></ol><ul><li>A Contractor&rsquo;s Personnel tells a member of the community that he/she can get them jobs related to the work site (e.g., cooking and cleaning) in exchange for sex.</li><li>A Contractor&rsquo;s Personnel that is connecting electricity input to households says that he can connect women headed households to the grid in exchange for sex.</li><li>A Contractor&rsquo;s Personnel rapes, or otherwise sexually assaults a member of the community.</li><li>A Contractor&rsquo;s Personnel denies a person access to the Site unless he/she performs a sexual favor.&nbsp;</li><li>A Contractor&rsquo;s Personnel tells a person applying for employment under the Contract that he/she will only hire him/her if he/she has sex with him/her.</li></ul><p>&nbsp;</p><ol><li><strong>Examples of sexual harassment</strong> <strong>in a work context</strong></li></ol><ul><li>A Contractor&rsquo;s Personnel comment on the appearance of another Installation Services Personnel (either positive or negative) and sexual desirability.</li><li>When a Contractor&rsquo;s Personnel complains about comments made by another Contractor&rsquo;s Personnel on his/her appearance, the other Contractor&rsquo;s Personnel comment that he/she is &ldquo;asking for it&rdquo; because of how he/she dresses.</li><li>Unwelcome touching of a Contractor&rsquo;s Personnel or Employer&rsquo;s Personnel by another Contractor&rsquo;s Personnel.</li><li>A Contractor&rsquo;s Personnel tells another Contractor&rsquo;s Personnel that he/she will get him/her a salary raise, or promotion if he/she sends him/her naked photographs of himself/herself.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Plant</strong></p><p>&nbsp;</p><p><strong>Contractor&rsquo;s Equipment</strong></p><p>Form EQU</p><p>The Bidder shall provide adequate information to demonstrate clearly that it has the capability to meet the requirements for the key Contractor&rsquo;s equipment listed in Section III, Evaluation and Qualification Criteria. A separate Form shall be prepared for each item of equipment listed, or for alternative equipment proposed by the Bidder.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p>Item of equipment</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>Equipment information</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:264px\"><p>Name of manufacturer</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Model and power rating</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Capacity</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Year of manufacture</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Current status</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Current location</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Details of current commitments</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Source</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Indicate source of the equipment</p><p>&nbsp;&nbsp;&nbsp;&nbsp; o Owned&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Rented&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Leased&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Specially manufactured</p></td></tr></tbody></table><p>&nbsp;</p><p>Omit the following information for equipment owned by the Bidder.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Owner</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Name of owner</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Address of owner</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Telephone</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Contact name and title</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Fax</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Telex</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Agreements</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Details of rental / lease / manufacture agreements specific to the project</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Functional Guarantees</strong></p><p>Form FUNC</p><p>&nbsp;</p><p>The Bidder shall copy in the left column of the table below, the identification of each functional guarantee required in the Specification and stated by the Employer in para. 1.2 (c) of Section III, Evaluation and Qualification Criteria, and in the right column, provide the corresponding value for each functional guarantee of the proposed plant and equipment.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:619px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:307px\"><p><strong>Required Functional Guarantee </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:312px\"><p><strong>Value of Functional Guarantee of the Proposed Plant and Equipment</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>1.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>2.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>3.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>&hellip;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Personnel</strong></p></td></tr></tbody></table><p><strong>Form PER -1</strong></p><p><strong>Contractor&rsquo;s Representative and other Key Personnel </strong></p><p><strong>Schedule </strong></p><p>Bidders should provide the names of suitably qualified personnel to meet the specified requirements stated in Section VII. The data on their experience should be supplied using the Form below for each candidate.</p><p><em>*As listed in Section III, Evaluation and Qualification Criteria.</em></p><p><strong>Contractor&rsquo; Representative and Key Personnel </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; height:22px; vertical-align:top; width:48px\"><ol><li><strong>1.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:558px\"><p><strong>Title of position: </strong>Contractor&rsquo;s Representative</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate: </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>2.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Environmental Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>3.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Health and Safety Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>4.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Social Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li>&nbsp;</li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: </strong><strong>Sexual Exploitation, Abuse and Harassment Expert</strong></p><p><em>&nbsp;[Where a Project SEA risks are assessed to be substantial or high, key personnel shall include an expert/s with relevant experience in addressing sexual exploitation, sexual abuse and sexual harassment&nbsp; cases]</em></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p><strong>7.</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:558px\"><p><strong>Title of position: [insert title]</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Form PER-2</p><p>&nbsp;</p><p><strong>Resume of Proposed Personnel&nbsp; </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p><strong>Name of Bidder</strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p><strong>Position</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p><strong>Personnel information</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Name </strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Date of birth</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Professional qualifications</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p><strong>Present employment</strong></p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Name of employer</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Address of employer</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Telephone</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Contact (manager / personnel officer)</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Fax</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>E-mail</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Job title</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Years with present employer</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>Summarize professional experience over the last 20 years, in reverse chronological order. Indicate particular technical and managerial experience relevant to the project.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p><strong>From</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p><strong>To</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p><strong>Company / Project / Position / Relevant technical and management experience</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px dotted black; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Proposed Subcontractors for Major Items of Plant and Installation Services</strong></p><p>&nbsp;</p><p>A list of major items of <u>Plant and Installation Services is provided below.</u></p><p>&nbsp;</p><p>The following Subcontractors and/or manufacturers are proposed for carrying out the item of the facilities indicated.&nbsp; Bidders are free to propose more than one for each item</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:199px\"><p><strong>Major Items of Plant and Installation Services</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:288px\"><p><strong>Proposed Subcontractors/Manufacturers</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:113px\"><p><strong>Nationality</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>11kV auto reclosers supply</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Telecommunications equipment (data radios and antennas)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Overhead line construction</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Protection and SCADA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Others - Time Schedule</strong></p><p>(to be used by Bidder when alternative Time for <strong>Completion is invited in ITB 13.2)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Bidders Qualification without prequalification</strong></p><p><strong>To establish its qualifications to perform the contract in accordance with Section III, Evaluation and Qualification Criteria the Bidder shall provide the information requested in the corresponding Information Sheets included hereunder. </strong></p><p>&nbsp;</p><p><strong>Form ELI 1.1</strong></p><p><strong>Bidder Information Sheet</strong></p><p>Date:&nbsp; ______________________</p><p>RFB No.: ___________________</p><p>Page ________ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:612px\"><p>1.&nbsp; Bidder&rsquo;s Legal Name</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:45px; vertical-align:top; width:612px\"><p>2.&nbsp; In case of JV, legal name of each party:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:612px\"><p>3.&nbsp; Bidder&rsquo;s actual or intended Country of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:612px\"><p>4.&nbsp; Bidder&rsquo;s Year of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>5.&nbsp; Bidder&rsquo;s Legal Address in Country of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>6.&nbsp; Bidder&rsquo;s Authorized Representative Information</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Name:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Address:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Telephone/Fax numbers:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Email Address:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>7. Attached are copies of original documents of</p><p>&nbsp;&nbsp;&nbsp; Articles of Incorporation (or equivalent documents of constitution or association), and/or documents of registration of the legal entity named above, in accordance with ITB 4.4</p><p>&nbsp;&nbsp;&nbsp; In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1</p><p>&nbsp;&nbsp;&nbsp; In case of state-owned enterprise or institution, in accordance with ITB 4.6, documents establishing:</p><ul><li>Legal and financial autonomy</li><li>Operation under commercial law</li><li>Establishing that the Bidder is not under the supervision of the Employer</li></ul><p>8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder shall provide additional information on beneficial ownership, using the Beneficial Ownership Disclosure Form.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form ELI 1.2</strong></p><p><strong>Party to JV Information Sheet</strong></p><p>Date: ______________________</p><p>RFB No.: ___________________</p><p>Page ________ of_ ______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:606px\"><p>1.&nbsp; Bidder&rsquo;s Legal Name:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:45px; vertical-align:top; width:606px\"><p>2.&nbsp; JV&rsquo;s Party legal name:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:606px\"><p>3.&nbsp; JV&rsquo;s Party Country of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>4. JV&rsquo;s Party Year of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>5.&nbsp; JV&rsquo;s Party Legal Address in Country of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>6.&nbsp; JV&rsquo;s Party Authorized Representative Information</p><p>Name:</p><p>Address:</p><p>Telephone/Fax numbers:</p><p>Email Address:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>7. Attached are copies of original documents of</p><p>&nbsp;&nbsp;&nbsp; Articles of Incorporation (or equivalent documents of constitution or association), and/or registration documents of the legal entity named above, in accordance with ITB 4.4.</p><p> &nbsp;&nbsp; In case of a state-owned enterprise or institution, documents establishing legal and financial autonomy, operation in accordance with commercial law, and that they are not under the supervision of the Employer, in accordance with ITB 4.6.</p><p>8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder shall provide additional information on beneficial ownership for each JV member using the Beneficial Ownership Disclosure Form.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 2</strong></p><p><strong>Historical Contract Non-Performance, Pending Litigation and Litigation History</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; _______________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name:&nbsp; _______________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp; ___________________</p><p>RFB No.:&nbsp; __________________</p><p>Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p>Non-Performed Contracts in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>&nbsp;&nbsp;&nbsp; Contract non-performance did not occur since 1st January <em>[insert year] </em>specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.1.</p><p>&nbsp;&nbsp;&nbsp; Contract(s) not performed since 1st January <em>[insert year]</em> specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><strong>Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Non- performed portion of contract</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><strong>Contract Identification</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:118px\"><p><strong>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for nonperformance: <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:118px\"><p><em>[insert amount]</em></p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>Pending Litigation, in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p> &nbsp;&nbsp; No pending litigation in accordance with Sub-Factor 2.3.</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p> &nbsp;&nbsp; Pending litigation in accordance with Sub-Factor 2.3 as indicated below.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:102px\"><p><strong>Year of dispute</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:137px\"><p><strong>Amount in dispute (currency)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:265px\"><p><strong>Contract Identification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:112px\"><p><strong>Total Contract Amount (currency), USD Equivalent (exchange rate)</strong></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:137px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:265px\"><p>Contract Identification: _________</p><p>Name of Employer: ____________</p><p>Address of Employer: __________</p><p>Matter in dispute: ______________</p><p>Party who initiated the dispute: ____</p><p>Status of dispute: <em>___________</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:137px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:265px\"><p>Contract Identification:</p><p>Name of Employer:</p><p>Address of Employer:</p><p>Matter in dispute:</p><p>Party who initiated the dispute:</p><p>Status of dispute:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:616px\"><p>Litigation History in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:616px\"><p> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No Litigation History in accordance with Sub-Factor 2.4.</p><p> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Litigation History in accordance with Sub-Factor 2.4 as indicated below.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p><strong>Year of award</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>Outcome as percentage of Net Worth </strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p><strong>Contract Identification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Total Contract Amount (currency), USD Equivalent (exchange rate)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p><em>[insert year]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><em>[insert percentage]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>Contract Identification: [indicate complete contract name, number, and any other identification]</p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Matter in dispute: <em>[indicate main issues in dispute]</em></p><p>Party who initiated the dispute: <em>[indicate &ldquo;Employer&rdquo; or &ldquo;Contractor&rdquo;]</em></p><p>Reason(s) for Litigation and award decision <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:78px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:13px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:111px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:13px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:225px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:106px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 3</strong></p><p><strong>Environmental and Social Performance Declaration </strong></p><p><em>[</em><em>The following table shall be filled in for the Bidder, each member of a Joint Venture and each Specialized Subcontractor]</em></p><p>Bidder&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Joint Venture Member&rsquo;s or Specialized Subcontractor&rsquo;s Name: <em>[</em><em>insert</em> <em>full name]</em><br />RFB No. and title: <em>[insert RFB number and title]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><tbody><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:630px\"><p>Environmental and Social Performance Declaration</p><p>in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:630px\"><p>&nbsp; <strong>No suspension or termination of contract</strong>: An employer has not suspended or terminated a contract and/or called the performance security for a contract for reasons related to Environmental or Social (ES) performance since the date specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.5.</p><p>&nbsp; <strong>Declaration of </strong><strong>suspension or termination of contract</strong>:&nbsp; The following contract(s) has/have been suspended or terminated and/or Performance Security called by an employer(s) for reasons related to Environmental or Social (ES) performance since the date specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.5. Details are described below:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><strong>Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Suspended or terminated portion of contract</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><strong>Contract Identification</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><strong>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for suspension or termination: <em>[indicate main reason(s) e.g., gender-based violence; sexual exploitation or sexual abuse breaches]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for suspension or termination: <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>&hellip;</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>&hellip;</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><em>[list all applicable contracts]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>&hellip;</em></p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:630px\"><p><strong>Performance Security called by an employer(s) for reasons related to </strong><strong>ES performance</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p>Year</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>Contract Identification</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for calling of performance security: <em>[indicate main reason(s) e.g., for gender-based violence; sexual exploitation, or sexual abuse breaches]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 4</strong></p><p><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment Performance Declaration </strong></p><p><em>[</em><em>The following table shall be filled in by the Bidder, each member of a Joint Venture and each subcontractor proposed by the Bidder]</em></p><p>Bidder&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Joint Venture Member&rsquo;s or Subcontractor&rsquo;s Name: <em>[</em><em>insert</em> <em>full name]</em><br />RFB No. and title: <em>[insert RFB number and title]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p><strong>SEA and/or SH Declaration </strong></p><p><strong>in accordance with Section III,</strong> <strong>Evaluation and Qualification Criteria</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>We:</p><p>&uml; (a) have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p><p>&uml;&nbsp; (b) are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p><p>&uml; (c) had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p><strong>[</strong><strong><em>If (c) above is applicable</em></strong><strong>, <em>attach evidence of an arbitral award reversing the findings on the issues underlying the disqualification.]</em></strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CCC</strong></p><p><strong>Current Contract Commitments / Works in Progress</strong></p><p>Bidders and each member to a JV should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:126px\"><p><strong>Name of contract</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p><strong>Employer, contact address/tel/fax</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Value of outstanding work (current US$ equivalent)</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Estimated completion date</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Average monthly invoicing over last six months<br />(US$/month)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>1.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>2.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>3.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>4.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>5.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>etc.</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN &ndash; 3.1</strong></p><p><strong>Financial Situation</strong></p><p><strong>Historical Financial Performance</strong></p><p>Bidder&rsquo;s Legal Name: _______________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _______________________<em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>RFB&nbsp;&nbsp; No.:&nbsp; __________________</p><p>Page _______ of _______ pages</p><p>To be completed by the Bidder and, if JV, by each member</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:658px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:13px; vertical-align:top; width:106px\"><p><strong>Financial information in US$ equivalent</strong></p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:13px; vertical-align:top; width:552px\"><p><strong>Historic information for previous ______ (__) years</strong></p><p>&nbsp;(US$ equivalent in 000s)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p><strong>2022/23</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p><strong>2023/24</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p><strong>2024/25</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p><strong>Avg.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Avg. Ratio</strong></p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:658px\"><p><strong>Information from Balance Sheet</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Assets (TA)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Liabilities (TL)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Net Worth (NW)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Current Assets (CA)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Current Liabilities (CL)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:658px\"><p><strong>Information from Income Statement</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Revenue (TR)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Profits Before Taxes (PBT)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Attached are copies of financial statements (balance sheets, including all related notes, and income statements) for the years required above complying with the following conditions:</strong></p><ol><li><strong>Must reflect the financial situation of the Bidder or member to a JV, and not sister or parent companies</strong></li><li><strong>Historic financial statements must be audited by a certified accountant</strong></li><li><strong>Historic financial statements must be complete, including all notes to the financial statements</strong></li><li><strong>Historic financial statements must correspond to accounting periods already completed and audited (no statements for partial periods shall be requested or accepted)</strong></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN &ndash; 3.2</strong></p><p><strong>Average Annual Turnover</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: ____________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p><em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>Page _______ of _______ pages</p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:618px\"><p><strong>Annual turnover data&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:100px\"><p>Year</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:344px\"><p>Amount and Currency</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:174px\"><p>US$ equivalent</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2022/23</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2023/24</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2024/25</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p><strong>*Average Annual Turnover</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr></tbody></table><p>&nbsp;</p><p>*Average annual turnover calculated as total certified payments received for work in progress or completed, divided by the number of years specified in Section III, Evaluation Criteria, Sub-Factor 2.3.2.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN3.3</strong></p><p><strong>Financial Resources</strong></p><p>Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines of credit, and other financial means, net of current commitments, available to meet the total cash flow demands of the subject contract or contracts as indicated in Section III, Evaluation and Qualification Criteria</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; height:25px; vertical-align:top; width:420px\"><p><strong>Source of financing</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:25px; vertical-align:top; width:186px\"><p><strong>Amount (US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>1.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>2.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>3.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>4.</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP 4.1</strong></p><p><strong>Experience </strong></p><p><strong>General Experience</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ____________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name:&nbsp; ____________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; width:72px\"><p><strong>Starting Month / Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:78px\"><p><strong>Ending Month / Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:60px\"><p>&nbsp;</p><p><strong>&nbsp;Years* </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:336px\"><p><strong>Contract Identification </strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:84px\"><p><strong>Role of Bidder</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract&nbsp;&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>*List calendar year for years with contracts with at least nine (9) months activity per year starting with the earliest year</p><p><strong>Form EXP &ndash;4.</strong><strong>2(a)</strong></p><p><strong>Specific Experience</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:241px\"><p><strong>Similar Contract Number:&nbsp; ___ of ___ required.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:341px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Contract Identification</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Award date</p><p>Completion date</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:29px; vertical-align:top; width:241px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; height:29px; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:29px; vertical-align:top; width:341px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Role in Contract</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:85px\"><p>Member in<br />JV</p><p>&nbsp; </p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>Subcontractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Total contract amount</p></td><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:389px\"><p>US$__________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>If member in a JV or subcontractor, specify participation of total contract amount</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>______%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>___________</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>&nbsp;</p><p>US$_______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Employer&rsquo;s Name:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Address:</p><p>&nbsp;</p><p>Telephone/fax number:</p><p>E-mail:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:241px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:48px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:36px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:85px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:115px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:106px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(a) (cont.)</strong></p><p><strong>Specific Experience</strong><strong> (cont.)</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>JV Member Legal Name:&nbsp; ___________________________</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p><strong>Similar Contract No. __[insert specific number] of [total number of contracts] ___ required</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:325px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Description of the similarity in accordance with Sub-Factor 4.2a) of Section III:</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Amount</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Physical size</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Complexity</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Methods/Technology</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Physical Production Rate</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(b)</strong></p><p><strong>Specific Experience in Key Activities</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>Subcontractor&rsquo;s Legal Name: ______________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:332px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Contract Identification</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Award date</p><p>Completion date</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Role in Contract</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>Subcontractor</p><p></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Total contract amount</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>US$________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>If member in a JV or subcontractor, specify participation of total contract amount</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p><p>__________%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>&nbsp;</p><p>_____________</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>US$________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Employer&rsquo;s Name:</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Address:</p><p>&nbsp;</p><p>Telephone/fax number:</p><p>E-mail:</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2 (b)(cont.)</strong></p><p><strong>Specific Experience in Key Activities (cont.)</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>JV Member Legal Name:&nbsp; ___________________________</p><p>Subcontractor&rsquo;s Legal Name: __________________________</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:325px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Description of the key activities in accordance with Sub-Factor 4.2b) of Section III:</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(c)</strong></p><p><strong>Specific Experience in Managing ES aspects and any additional sustainable procurement aspects</strong></p><p>&nbsp;</p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>Subcontractor&rsquo;s Legal Name: ______________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><ol><li><ol><li><ol><li><ol><li>Key Requirement no 1 in accordance with 4.2 (c): __</li></ol></li></ol></li></ol></li></ol><p>____________________</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:624px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:256px\"><p>Contract Identification</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:27px; vertical-align:top; width:256px\"><p>Award date</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:27px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:256px\"><p>Completion date</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:74px; vertical-align:top; width:256px\"><p>Role in Contract</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:92px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:96px\"><p>Member in<br />JV</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:90px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:90px\"><p>Subcontractor</p><p></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:256px\"><p>Total Contract Amount</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; width:368px\"><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; US$ ____________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:256px\"><p>Details of relevant experience</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; width:368px\"><p>&nbsp;</p></td></tr></tbody></table><ol><li><ol><li><ol><li><ol><li>Key Requirement no 2 in accordance with 4.2 (c): <em>______________________</em></li><li>Key Requirement no 3 in accordance with 4.2 (c): <em>______________________</em></li></ol></li></ol></li></ol></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form of Bid Security</strong></p><p><strong>Form of Bid Security &ndash; Bank Guarantee</strong></p><p>&nbsp;</p><p><em>[The bank shall fill in this Bank Guarantee Form in accordance with the instructions indicated.]</em></p><p>&nbsp;</p><p><em>[Guarantor letterhead or SWIFT identifier code]</em></p><p><strong>Beneficiary:&nbsp; </strong><em>[Employer to insert its name and address]</em></p><p><strong>RFB No.:</strong><em>[Employer to insert reference number for the Request for Bids]</em></p><p><strong>Alternative No</strong><em>.: [Insert identification No if this is a Bid for an alternative]</em></p><p><strong>Date:</strong><em>[Insert date of issue]</em></p><p><strong>BID GUARANTEE No.:</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor:&nbsp; </strong><em>[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p>We have been informed that ______ <em>[insert name of the Bidder, which in the case of a joint venture shall be the name of the joint venture (whether legally constituted or prospective) or the names of all members thereof]</em>(hereinafter called &quot;the Applicant&quot;) has submitted or will submit to the Beneficiary its Bid (hereinafter called &quot;the Bid&quot;) for the execution of ________________ under RFB No. ____________</p><p>Furthermore, we understand that, according to the Beneficiary&rsquo;s conditions, Bids must be supported by a Bid guarantee.</p><p>At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ (____________) upon receipt by us of the Beneficiary&rsquo;s complying demand, supported by the Beneficiary&rsquo;s statement, whether in the demand itself or a separate signed document accompanying or identifying the demand, stating that either the Bidder:</p><p>(a) &nbsp;&nbsp;&nbsp; has withdrawn its Bid prior to the Bid validity expiry date set forth in the Applicant&rsquo;s Letter of Bid, or any extended date provided by the Applicant; or</p><p>(b) &nbsp;&nbsp; having been notified of the acceptance of its Bid by the Beneficiary prior to the expiry date of the Bid validity or any extension thereto provided by the Applicant, (i) has failed to execute the Contract Agreement, or (ii) has failed to furnish the Performance Security, in accordance with the Instructions to Bidders (&ldquo;ITB&rdquo;) of the Beneficiary&rsquo;s bidding document.</p><p>This guarantee will expire: (a) if the Applicant is the successful Bidder, upon our receipt of copies of the contract agreement signed by the Applicant and the Performance Security issued to the Beneficiary in relation to such contract agreement; or (b) if the Applicantis not the successful Bidder, upon the earlier of (i) our receipt of a copy of the Beneficiary&rsquo;s notification to the Applicant of the results of the Bidding process; or (ii)twenty-eight days after the expiry date of the Bid validity.</p><p>Consequently, any demand for payment under this guarantee must be received by us at the office indicated above on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758.</p><p>&nbsp;</p><p><strong>_____________________________</strong></p><p><em>[Signature(s)]</em></p><p><strong><em>Note:&nbsp; All italicized text is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Manufacturer&rsquo;s Authorization</strong></p><p>&nbsp;</p><p>Date: <em>__________________</em></p><p>RFB No.: <em>_________________</em></p><p>To:&nbsp; <em>________________________</em></p><p>WHEREAS</p><p>&nbsp;</p><p>We <em>___________________,</em> who are official manufacturers of<em>____________________,</em> having factories at _____________________, do hereby authorize <em>______________________ </em>to submit a Bid the purpose of which is to provide the following goods, manufactured by us <em>_______________________,</em> and to subsequently negotiate and sign the Contract.</p><p>&nbsp;</p><p>We hereby extend our full guarantee and warranty in accordance with Clause 27 of the General Conditions, with respect to the goods offered by the above firm.</p><p>&nbsp;</p><p>Signed: <em>_______________________________________</em></p><p>&nbsp;</p><p>&nbsp;</p><p>Name: <em>______________________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>&nbsp;</p><p>Title:<em>______________________________________</em></p><p>&nbsp;</p><p>Duly authorized to sign this Authorization on behalf of: <em>______________________________________</em></p><p>&nbsp;</p><p>Dated on ____________ day of __________________, _______</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENT</em></p><p><em>The Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder&rsquo;s complete name and business address.</em></p><p><em><u>Note</u>: All italicized text is to help Bidders in preparing this form. </em></p></td></tr></tbody></table><p><br />Letter of Bid - Financial Part</p><p>&nbsp;</p><p><strong>Date of this Bid submission</strong>: [<em>insert date (as day, month and year) of Bid submission</em>]</p><p><strong>Request for Bid No</strong>.: [<em>insert identification</em>]</p><p><strong>Alternative No.</strong>:<em> </em>[<em>insert identification No if this is a Bid for an alternative</em>]</p><p>&nbsp;</p><p>To: <strong>[<em>insert complete name of Employer</em>]</strong></p><p>&nbsp;</p><p>We, the undersigned, hereby submit the second part of our Bid, the Bid Price and Bill of Quantities. This accompanies the Letter of Bid- Technical Part.</p><p>In submitting our Bid, we make the following additional declarations:</p><ol><li><strong>Bid Validity</strong>: Our Bid shall be valid until <em>[insert day, month and year in accordance with ITB 19.1]</em>, and it shall remain binding upon us and may be accepted at any time on or before this date;</li><li><strong>Total Price</strong>: The total price of our Bid, excluding any discounts offered in item (f) below is: [Insert one of the options below as appropriate]</li></ol><p><em>[Option 1, in case of one lot:]</em>&nbsp; Total price is: <u>[<em>insert the total price of the Bid in words and figures, indicating the various amounts and the respective currencies</em>];</u></p><p>Or</p><p><em>[Option 2, in case of multiple lots:]</em> (a) Total price of each lot [<em>insert the total price of each lot in words and figures, indicating the various amounts and the respective currencies</em>]; and (b) Total price of all lots (sum of all lots) [<em>insert the total price of all lots in words and figures, indicating the various amounts and the respective currencies</em>];</p><ol><li><strong>Discounts:</strong> The discounts offered and the methodology for their application are:</li></ol><p>(i) The discounts offered are: [<em>Specify in detail each discount offered</em>]</p><p>(ii) The exact method of calculations to determine the net price after application of discounts is shown below: [<em>Specify in detail the method that shall be used to apply the discounts</em>];</p><ol><li><strong>Commissions, </strong>gratuities<strong> and fees:</strong> We have paid, or will pay the following commissions, gratuities, or fees with respect to the Bidding process or execution of the Contract: [<em>insert complete name of each Recipient, its full address, the reason for which each commission or gratuity was paid and the amount and currency of each such commission or gratuity</em>].</li></ol><p>&nbsp;&nbsp;&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:168px\"><p>Name of Recipient</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:168px\"><p>Address</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:138px\"><p>Reason</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:103px\"><p>Amount</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>(If none has been paid or is to be paid, indicate &ldquo;none.&rdquo;)</p><p>&nbsp;</p><p><strong>Name of the Bidder</strong>:*[<em>insert complete name of&nbsp; the Bidder</em>]</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: ** [<em>insert complete name of person duly authorized to sign the Bid</em>]</p><p><strong>Title of the person signing the Bid</strong>: [<em>insert complete title of the person signing the Bid</em>]</p><p><strong>Signature of the person named above</strong>: [<em>insert signature of person whose name and capacity are shown above</em>]</p><p><strong>Date signed</strong> [<em>insert date of signing</em>] <strong>day of</strong> [<em>insert month</em>], [<em>insert year</em>]</p><p>&nbsp;</p><p><strong>*</strong>: In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder.</p><p>**: Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule of Rates and Prices</strong></p><p><strong>Price schedule to be accessed from the following link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p><strong>Schedule No. 1.&nbsp; Plant and Mandatory Spare Parts Supplied from Abroad</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Country of Origin Declaration Form</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 2.&nbsp; Plant and Mandatory Spare Parts Supplied from Within the Employer&rsquo;s Country</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:600px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:504px\"><p>&nbsp;</p><p>&nbsp;</p><p>1 Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 3.&nbsp; Design Services</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 4.&nbsp; Installation and Other Services</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 5.&nbsp; Grand Summary</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Price Adjustment</strong></p><p>&nbsp;</p><p>If price adjustment applies in accordance with ITB 17.9, the Bidder shall indicate the sources of indices and source of exchange rate (if applicable) and the base date indices in its Bid.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:159px\"><p>Item</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:165px\"><p>Source of Indices</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:150px\"><p>Base date Indices</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:165px\"><p>Source of exchnage rate (if applicable)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section V - Eligible Countries</strong></p><p>&nbsp;</p><p><strong>Eligibility for the Provision of Goods, Works and Non-Consulting Services in<br />Bank-Financed Procurement</strong></p><p>&nbsp;</p><p>In reference to ITB 4.8 and 5.1, for the information of the Bidders, at the present time firms, goods and services from the following countries are excluded from this Bidding process: <strong>None</strong></p><p>Under ITB 4.8 (a) and 5.1: <strong>None</strong></p><p><br />&nbsp;</p><p>&nbsp;</p><p><strong>Section VI - Fraud and Corruption</strong></p><p><strong>(this Section shall not be changed)</strong></p><p>&nbsp;</p><ol><li><strong>Purpose</strong><ol><li>The Bank&rsquo;s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.</li></ol></li><li><strong>Requirements</strong></li></ol><ol><li>The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.</li><li>To this end, the Bank:</li></ol><ol><li>Defines, for the purposes of this provision, the terms set forth below as follows:</li></ol><ol><li>&ldquo;corrupt practice&rdquo; is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;</li><li>&ldquo;fraudulent practice&rdquo; is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;</li><li>&ldquo;collusive practice&rdquo; is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;</li><li>&ldquo;coercive practice&rdquo; is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;</li><li>&ldquo;obstructive practice&rdquo; is:</li></ol><ol><li>deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or</li><li>acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights provided for under paragraph 2.2 e. below.</li></ol><ol><li>Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;</li><li>In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question,&nbsp; without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time&nbsp; they knew of the practices;</li><li>Pursuant to the Bank&rsquo;s Anti- Corruption Guidelines and in accordance with the Bank&rsquo;s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[9] (ii) to be a nominated[10] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;</li><li>Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents, personnel, permit the Bank to inspect[11] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.</li></ol><p>&nbsp;</p><p><strong>PART 2 - Employer&rsquo;s Requirements</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:53px; width:613px\"><p><strong>Section VII - Employer&rsquo;s Requirements</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Contents</strong></p><p><strong>Scope of Supply of Plant and Installation Services by the Contractor. 160</strong></p><p><strong>Specification. 161</strong></p><p><strong>Forms and Procedures. 168</strong></p><p>Form of Completion Certificate. 169</p><p>Change Order Procedure and Forms. 171</p><p>Change Order Procedure. 172</p><p>Annex 1.&nbsp; Request for Change Proposal 173</p><p>Annex 2.&nbsp; Estimate for Change Proposal 175</p><p>Annex 3.&nbsp; Acceptance of Estimate. 177</p><p>Annex 4.&nbsp; Change Proposal 178</p><p>Annex 5.&nbsp; Change Order 181</p><p>Annex 7.&nbsp; Application for Change Proposal 184</p><p><strong>Drawings. 186</strong></p><p><strong>Supplementary Information. 187</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Scope of Supply of Plant and Installation Services by the Contractor</strong></p><p>The scope covers the design, supply, equipment installation and commissioning of the 13 pole mounted 11kV auto-reclosers as per the configuration shown in the figure below. The scope highlighted below is a guide to the bidder and any tasks necessary to deliver the project as per the bidder&rsquo;s design should be included in the scope to be submitted.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><strong>Design</strong><strong> </strong></li></ol></li></ol><p>&nbsp;</p><p>The following is to be done by the supplier.</p><ol><li>Prepare design report and drawings for the structure to replace existing auto-reclosers with fully remotely operated breakers. The same design to be also used in the proposed new sites. (One Standard Structure &ndash; To be used in all 13 structures).</li><li>Design and install an earthing system where the earth resistance should be less than 5 ohms.</li><li>Drawings to be approved by EEC prior to installation.</li><li>Specify interface between pole mount Control Unit and Breaker</li><li>Capture coordinates of the different points where the remotely controlled auto-reclosers will be installed and check for UHF signal availability in all the sites.</li><li>Do frequency planning for UHF Data radios to be used for communication between SCADA &ndash; NCC and Control Unit.</li></ol><p><strong><em>Note: </em></strong><em>In certain instances, use the nearest substation with UMUX Interface.</em></p><ol><li><ol><li><strong>Procurement:</strong></li></ol></li></ol><p>The following will have to be procured for the project.</p><p><strong>Externally (Provided by supplier):</strong></p><ol><li>13 Remotely controlled auto recloser breakers, accessories, software and licencing. The general circuit breaker specification is included under &lsquo;Specifications.&rsquo; This includes the Control Units and Switchgear.</li><li>Data radios with UHF antennas (Depending on frequency planning) , accessories, software and licencing.</li><li>Depending on interface between radios, control unit and breaker &ndash; supplier to provide interface cables and accessories.</li><li>Single phase Power cables and accessories.</li><li>11kV Lightning arrestors</li><li>labels &ndash; danger signs</li><li>11kV Isolating links</li><li>Overhead line material and accessories</li></ol><p>&nbsp;</p><p><strong>Internal (To be supplied by EEC).</strong></p><ol><li>Procure D10 poles (10) limited to 4 structures per site with the relevant cross&ndash;arm depending on design.</li><li>Earthing equipment for all 13 sites (camo conductor, spikes, clamps, lugs for camo conductor, conductive cement). Ensure earth resistance for site is less than 5 Ohms &ndash; depending on design.</li><li>13 of 16kVA single phase transformers, combi units, LV MCB, pole mounted boxes.</li><li>ACSR overhead conductor Hare and Mink<ol><li><strong>Installation</strong><strong> and Commissioning</strong></li></ol></li></ol><p><strong>Construction (Supplier):&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><ol><li>Dismantling of existing 13 structures where applicable.</li><li>Erect the up the pole structure per site in all the identified 13 structures.</li><li>Install, test and commission Auto recloser and mount control unit.</li><li>String ACSR and install corresponding dropout fuses.</li><li>Ensure all equipment in structure is properly earthed and take earth resistance for record keeping. (Earth resistance to be below 5 Ohms)</li><li>Install, test and commission 16kVA transformers and corresponding MV LV equipment</li><li>Recover old recloser for disposal / keeping as spare (<strong>to be done by EEC)</strong>.</li><li>Installation of bypass gang switch and structure (<strong>to be done by EEC)</strong>.</li></ol><p>&nbsp;</p><p><strong>Protection (bidder):</strong></p><ol><li>Configure the breaker and prepare it for interface with the SCADA System.</li><li>Ensure all analogue and digital points are ready for the SCADA department.</li><li>Commission the breaker with the SCADA department.</li></ol><p>&nbsp;</p><p><strong>Telecommunications (Supplier):</strong></p><ol><li>Install Data radio with all accessories (Antenna, feeder cable, and interface to Control Unit) and ensure connectivity to NCC.</li><li>Configure the Data radio.</li><li>Commission link to NCC.</li><li>Ensure all the radio equipment is properly earthed.</li></ol><p>&nbsp;</p><p><strong>SCADA (Supplier):</strong></p><ol><li>Build all the breakers in the main SCADA System together with EEC personnel.</li><li>Mount Control Unit and configure it for remote operation to NCC.</li><li>Ensure proper earthing of all SCADA equipment and provide power backup for Control Unit.</li><li>Test and Commission the auto recloser to NCC with EEC personnel.</li><li>Prepare final documentation for all the SCADA related equipment.</li><li>Update the network diagram as per procedure for all new projects (<strong>to be done by EEC)</strong>.<ol><li><strong>Training</strong></li></ol></li></ol><p>Provide formal training on the equipment as well. This should be specified in the quotation for the project. The training should be done before project implementation (State the period for training on the breaker, control unit and any other training that might be required for the project). Training should cover 25 technicians from the different sections internally (SCADA, Protection, Switchgear, Distribution, Telecoms).</p><ol><li><strong>METHODOLOGY</strong></li></ol><p>The bidders are expected to provide a methodology showing how the design, construction, installation and commissioning exercise will be carried out. Include block diagrams where appropriate showing how the entire system integrates. This will indicate the level of understanding of what is expected from the Plant design, supply and installation Contractor.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Specification</strong></p><p>This specification covers the requirements for an automatic electrically controlled three phase vacuum recloser for distribution systems. The recloser is intended for radial, loop, and meshed networks.</p><ol><li><ol><li><strong>Quality Assurance</strong></li></ol></li></ol><p>&nbsp;</p><p>3.2.1 Manufacturer qualifications: The chosen manufacturer shall have at least 10 years&rsquo; experience in manufacturing vacuum reclosers. The manufacturer of the reclosers shall be completely and solely responsible for the performance of the reclosers as a complete integrated assembly as rated.</p><p>3.2.2 Main recloser components such as circuit breaker, vacuum interrupters, current and voltage sensors, control cubicle and software shall be manufactured by the same manufacturer.</p><p>3.2.3 The manufacturer shall be able to submit the confirmation of certification or ratings of the reclosers upon request.</p><p>3.2.4 The recloser shall be manufactured and type tested according to requirements of applicable industry standards:</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a) IEC 62271-111</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b) IEEE C37.60</p><p>3.2.5 The recloser manufacturing process shall be complying with the standard ISO 9001, Quality Management System.</p><p>3.2.6 The type test reports should be issued not more than 5 years before the submission date.</p><p>3.2.7 The manufacturer shall provide minimum 5-year warranty for all components provided.</p><p>3.2.8 The circuit breaker shall be maintenance free over a total life expectancy.</p><p>&nbsp;</p><p><strong>3.3&nbsp;&nbsp; Delivery, storage, and handling</strong></p><p>3.3.1 Packing components shall not contain any materials that are hazardous to the environment or personnel. No special methods of disposal shall be required.</p><p>3.3.2 All recloser components including circuit breaker, control cubicle, installation frame, pole interface provisions, fasteners shall be delivered in a single package made of recyclable materials.</p><p>3.3.3 The package gross weight shall not exceed 300 kg.</p><p>3.3.4 It shall be possible to stack at least two original packages during transportation and storage.</p><p>3.3.5 The package shall allow stapling and outdoor storage in case indoor storage is unavailable. Unpacked and assembled equipment shall be storable outdoor for not less than 1 year without additional treatment before installation.</p><p>3.3.6 All recloser components shall be installed, assembled, and tested in accordance with the requirements of current specification. The recloser shall be delivered fully assembled on the mounting frame and ready for the installation.&nbsp;</p><p>3.3.7 The recloser installation kit shall be designed to reduce the number of lifting operations.</p><p><strong>3.4 Technical Specification</strong></p><p><strong>3.4.1 General</strong></p><p><strong>3.4.1.1 Technical parameters</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>a)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:302px\"><p>Rated maximum voltage, kV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:76px\"><p>12&hellip;15</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>d)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated lightning impulse withstand voltage (peak), kV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>110</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>e)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated continuous current, A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>630</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>h)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated short-circuit breaking current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>16</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>i)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated peak withstand current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>41.6</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>j)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated short time withstand current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>16</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>k)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated duration of short circuit, s</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>4</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>l)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated frequency, Hz</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>50</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>3.4.1.2 Power supply characteristics</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>a)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:302px\"><p>Supply voltage range shall not be less than, V</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:151px\"><p>85 &hellip; 265 AC</p><p>110 &hellip; 220 DC</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>b)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated power consumption shall not exceed, VA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>40</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>c)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Maximum power consumption shall not exceed, VA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>75</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>d)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Duration of operation without auxiliary supply shall be not less than, hours</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>48</p></td></tr></tbody></table><p><strong>3.4.2 Recloser control</strong></p><p>3.4.2.1 The recloser operation shall be controlled by electronic control modules.</p><p>3.4.2.2 The recloser control shall provide the following functions: measurement, protection, monitoring, and remote communication.</p><p>3.4.2.3 The recloser control air circulation and dehydration shall be organized to avoid using any humidity control devices or heaters.</p><p>3.4.2.4 The external and internal doors shall be able to be securely fixed in the open position.</p><p>3.4.2.5 It shall be possible to connect the laptop with configuration software by means of serial interface (USB, RS232).</p><p>3.4.2.6 Ethernet (RJ45), Optical Ethernet (SC) SCADA and wireless local engineering access interfaces (Bluetooth, Wi-Fi) shall be available for ordering optionally.</p><p>3.4.2.7 The recloser control shall be equipped with a prewired provision for power supply outlet installation. Socket shall be MCB protected.</p><p>3.4.2.8 The recloser control shall be equipped with a removable provision for communication equipment installation. It shall be located at the top of the controller and provide at least 326x180x108mm space for communication equipment. Stationary provision is not accepted.</p><p>3.4.2.9 The recloser control shall be equipped with the control panel module. The module shall provide local control and indication functions by LED, display, and buttons.</p><p>3.4.2.10 The local control panel module shall be equipped with USB A interface.</p><p>3.4.2.11 The control panel box shall have a provision for a padlock.</p><p><strong>3.4.3 Rechargeable Battery</strong></p><p>3.4.3.1 The recloser shall be supplied with rechargeable battery to provide the recloser control with auxiliary power when the main auxiliary power is not present.</p><p>3.4.3.2 The battery shall be of a sealed lead acid.</p><p>3.4.4.3 The battery shall provide ten full auto reclosing cycles for the recloser without auxiliary power supply.</p><p><strong>3.4.4 Protection</strong></p><p>The auto-recloser shall have the following protection functionalities but not limited to:</p><ol><li>Cold load pickup</li><li>Source detector</li><li>Combined overcurrent and earth fault auto-reclosing</li><li>Directional phase overcurrent</li><li>Directional sensitive earth fault</li><li>Directional earth fault</li><li>Loss of supply</li><li>Zone sequence coordination</li><li>Voltage and current unbalance</li><li>Under-voltage and over voltage auto reclosing</li></ol><p>&nbsp;</p><p><strong>3.4.5 Communication</strong></p><p>The recloser control shall provide:</p><p><strong>3.4.5.1 PMR Telecoms Integration</strong></p><p><strong>1 General Integration </strong></p><ol><li><strong>Turnkey Connectivity Responsibility:</strong> The Contractor shall be fully responsible for the complete end-to-end integration of each Pole-Mounted Recloser (PMR) into the Employer&rsquo;s existing telecoms network via the DNP3 protocol over a 12.5 kHz licensed radio channel.</li></ol><p>&nbsp;</p><ol><li><strong>Scope of Supply:</strong> The Contractor shall provide a fully operational, integrated telemetry solution. The Contractor&rsquo;s scope of supply shall include all hardware, software, licenses, interfaces, and equipment required to establish communication between the PMR and the designated access point, with the sole exception of the physical radio frequency license.</li></ol><p>&nbsp;</p><p><strong>2 Equipment and Hardware Requirements</strong></p><ol><li><strong>Telemetry Equipment Supply:</strong> If an existing Employer-owned Trio QB Access Point has the RF and protocol capacity to absorb the new PMR(s), the Contractor shall supply only the remote-end equipment. This includes, but is not limited to:<ul><li><strong>Remote Radio:</strong> Data radio compatible with the existing network (Existing PMRs use Schneider Electric Trio Q-Series).</li><li><strong>Antenna System:</strong> High-gain directional Yagi antenna, low-loss coaxial cabling, surge arrestors, mounting brackets etc.</li><li><strong>Interface Converters:</strong> e.g., DIGI or equivalent where required</li></ul></li><li><strong>Greenfield Access Point Provisions: </strong>If the Employer determines that existing Access Points cannot absorb the new PMR(s) due to capacity, bandwidth limitations or geographical line-of-sight constraints, the Contractor shall design and supply a completely new network node. In this scenario, the Contractor&rsquo;s scope shall expand to include:<ul><li>Master-end base station equipment</li><li>Omnidirectional antenna.</li><li>All network routing, interfacing, and aggregation hardware required to drop the telemetry traffic back into the Employer&#39;s core telecoms network.</li></ul></li></ol><p>&nbsp;</p><ol><li><strong>Radio Frequency and Licensing</strong></li></ol><ol><li><strong>Employer Responsibility:</strong> The Employer will retain ownership of the radio spectrum (400 &ndash; 430MHz). Should the Contractor&rsquo;s network design or capacity calculations necessitate a new operating frequency, the Employer will undertake and finance the procurement of the new frequency license from the local regulatory authority.</li><li><strong>Contractor Responsibility:</strong> The Contractor must formally notify the Employer in writing during the engineering design phase if a new frequency or access point is required. The Contractor shall provide all technical data necessary for the Employer to file the regulatory spectrum application.</li></ol><p>&nbsp;</p><p><strong>3.4.5.2 SCADA/Telemetry Integration</strong></p><ol><li><strong>General</strong><ol><li>The Contractor shall be responsible for the telemetry configuration and commissioning of the PMR, aligned to the protocol requirements between the SCADA master and the PMR.</li><li>The configuration shall align with the standard addressing requirements for each site</li><li>The Controller/control panel shall have a Type M plug for 230VAC, to allow laptop use on-site.</li></ol></li><li><strong>Protocols</strong><ol><li>The protocol of communication shall be DNP3.0 (Subset Level 3) via the telecoms backbone.</li><li>IEC 60870-5-101 and IEC 60870-5-104 shall be available options for client-server communication.</li><li>The PMR controller shall be configurable for unsolicited communication or reporting to the master.</li><li>The controller shall be configured for time synchronization with the master or where possible or practical via a GPS based local clock</li></ol></li></ol><p>&nbsp;</p><ol><li><strong>Interfaces/ Ports</strong></li></ol><p>&nbsp;</p><p>The PMR panel/controller shall have the following interfaces/ports</p><p>&nbsp;</p><table border=\"1\" style=\"width:602px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p><strong>Port</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p><strong>Physical Interface</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Typical Use</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>USB</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>USB Type-B (front panel)</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Local engineering</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>RS-232 Port</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>DB9</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>SCADA serial communications (DNP3 Serial, IEC60870-5-101)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>Ethernet</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>RJ45 10/100 Mbps</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>SCADA over DNP3 TCP, IEC 60870-5-104</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>RS-485</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>Optional</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Third-party modem or serial communications</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong>Cybersecurity</strong></li></ol><p><strong>The following are key cybersecurity requirements;</strong></p><ul><li>Comply with IEC 62443 (Industrial Automation and Control Systems cybersecurity).</li><li>Support IEC 62351 security measures for power system communications, including secure DNP3 communications where applicable.</li><li>Meet the cybersecurity capability requirements of IEEE 1686 for Intelligent Electronic Devices (IEDs).</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Environmental and Social (ES) requirements </strong></p><p><strong>The project Environmental and Social Safeguards and tentative Contractor &ndash; Environment &amp; Social Management Plan templates can be accessed in the following link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p><strong>1. ENVIRONMENTAL AND SOCIAL MANAGEMENT REQUIREMENTS </strong></p><p>The Contractor shall comply with all environmental impact prevention and mitigation measures outlined in the Environmental and Social Management Framework (ESMF) as described herein. Where there is a conflict of requirements, the prevention and mitigation measures listed in the ESMF shall govern.</p><p>The Contractor (and sub-contractors) will need to adopt this ESMF and prepare a comprehensive Contractor&rsquo;s (Construction) Environment and Social Management Plan (CESMP) that will provide the key reference point for compliance.</p><p>The Project Applicant, namely the EEC, is responsible for ensuring that the Contractor Team&rsquo;s execution of the construction phase activities is compliant with the conditions of the ESMF and CESMP. The Contractor must therefore ensure compliance with the ESMF, CESMP, LMP, SEP, SEA/SH Action Plan, GRM Procedure and the OCHSIP at all times during construction activities and maintain environmental and social incidents and GRM registers which keeps a record of all environmental and social incidents as well as community/worker grievances that occur on the site during the installation of the 11kV auto reclosers contracts. These incidents may include:</p><ul><li>Public involvement / complaints.</li><li>Health, safety and SEA/SH incidents.</li><li>Incidents involving Hazardous materials stored on site.</li><li>Non-compliance incidents.</li></ul><p>The Contractor is also responsible for the implementation of corrective actions issued by the Employer within a reasonable or agreed upon period of time.</p><p>Within the first 15 days following contract signing, the Contractor shall present an C-ESMP Implementation Plan. The Plan shall be submitted to the Employer for approval prior to the start of the construction works. The Contractor ESMP shall contain, at a minimum but not limited to, the following components:</p><ul><li>An implementation timetable for the ESMP measures that are integrated with the Contractors&rsquo; work plan and timetable for the construction activities;</li><li>A table that identifies the Environmental and Social Specialist (ESS) as well as the names and responsibilities of each member of the Contractor&rsquo;s team that will be in charge of implementing the C-ESMP;</li><li>An organization chart showing ESS reporting directly to the Project Manager.</li><li>The ESS shall be available to participate in progress meetings with the Environmental Health and Safety Specialists (EHSS) appointed by the Employer;</li><li>The procedures the Contractor will use for internal communication and coordination about the application, monitoring and control of the C-ESMP measures. These procedures should include &ndash; at a minimum &ndash; the dissemination of environmental implementation and the ESMP among the Contractor&rsquo;s corrective actions that will be taken in the event of failure by the Contractor&rsquo;s staff to comply with environmental and social requirements;</li><li>Contractor&rsquo;s Labor Management Procedure, Stakeholder Engagement Procedure, Grievance Redress Mechanism Procedure, a procedure detailing how SEA/SH issues will be handled.</li><li>The procedures the Contractor will use for external communication and coordination with the organizations working on issues related to emergency preparedness and response programs; and Reporting procedures.</li></ul><p>Any deviations from the approved Contractor&rsquo;s (Construction) ESMP must be submitted to the Employer for approval.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><em>Compliance with requirements established in General Condition of Contract (GCC) </em></strong></p><p>The Environmental and Social requirements shall be prepared in a manner that does not conflict with the relevant General Conditions of Contract and Particular Conditions of Contract, and in particular:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:623px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:72px\"><p>GCC</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:130px\"><p>&nbsp;Sub-Clause/Clause</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:421px\"><p>Remarks</p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:72px\"><p><em>9.10</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:130px\"><p><em>Training of Contractor&rsquo;s Personnel</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:421px\"><p>The Contractor shall ensure that all Contractor personnel receive mandatory training on Environmental and Social (E&amp;S) requirements prior to commencement of works. Training shall include, at a minimum: (i) CESMP obligations; (ii) pollution prevention and waste management; (iii) community health and safety risks; (iv) SEA/SH awareness and Code of Conduct; (v) grievance redress procedures; and (vi) emergency preparedness and response. Refresher training and toolbox talks shall be conducted periodically.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>20</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Design and Engineering</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall ensure that all designs comply with applicable national legislation, Environmental Authorization conditions, and World Bank ESF requirements (particularly ESS4). Designs shall: (i) incorporate climate resilience measures (e.g. flood risk, extreme weather tolerance); (ii) ensure universal access where applicable; (iii) minimize environmental footprint and vegetation clearing; (iv) assess and mitigate risks to the public from operational hazards; and (v) comply with applicable engineering and safety certification standards. All designs shall be reviewed and approved prior to implementation.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.2.4</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Rates of wages and conditions of labor</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall comply with the Labour Management Procedures (LMP), national labour laws, and ESS2 requirements. This includes: (i) fair wages in line with national minimum standards; (ii) safe and decent working conditions; (iii) prohibition of child labour and forced labour; (iv) non-discrimination and equal opportunity; and (v) provision of written contracts to all workers.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.2.6</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Facilities for Staff and Labor</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall provide adequate facilities for all personnel, including: (i) safe drinking water; (ii) sanitary and washing facilities segregated where appropriate; (iii) waste management systems; (iv) first aid and medical access; and (v) where accommodation is required, it shall meet GIIP and national standards. Facilities shall be culturally appropriate and accessible, and shall not create environmental or social risks to surrounding communities (ESS2 &amp; ESS4).</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.8</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Security of the Site</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall establish security arrangements consistent with ESS4 and GIIP. Security measures shall be proportionate to the level of risk and shall respect human rights. The Contractor shall: (i) avoid use of excessive force; (ii) train security personnel on Code of Conduct and SEA/SH prevention; (iii) coordinate with local authorities; and (iv) ensure security does not restrict community access unnecessarily. All incidents involving security personnel shall be recorded and reported.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.9</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Protection of the Environment</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall implement all necessary measures to prevent pollution and environmental degradation in accordance with ESS3 and national legislation. The following limits and controls shall apply:</p><ol><li>Hazardous materials must be stored in bunded areas;</li><li>&nbsp;Dust emissions shall be controlled to prevent nuisance beyond site boundaries;</li><li>&nbsp;Noise levels shall comply with national standards and approved working hours;</li><li>All waste shall be segregated and disposed of at licensed facilities; and</li><li>Fuel and oil spills shall be contained and remediated immediately. The CESMP shall define monitoring measures, thresholds, and corrective actions.</li></ol><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.11 </em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Cultural Heritage Findings</em></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall implement a Chance Finds Procedure in accordance with ESS8. In the event of discovery of cultural heritage resources:</p><ol><li>All works shall stop immediately in the affected area;</li><li>The site shall be secured;</li><li>&nbsp;Relevant authorities shall be notified; and</li></ol><p>Works shall only resume upon formal clearance.</p><ol><li>Workers shall be trained on recognizing and reporting chance finds.</li></ol></td></tr></tbody></table><p>&nbsp;</p><p><strong>2. Environmental Monitoring and Reporting Requirements</strong></p><p>The Contractor shall establish and implement an Environmental Monitoring and Reporting Programme as part of the CESMP to ensure compliance with environmental requirements and to verify the effectiveness of mitigation measures in accordance with ESS1 of the World Bank ESF and applicable national legislation.</p><p>Environmental monitoring shall be risk-based, proportionate to the scale and nature of the works, and shall cover all significant environmental aspects associated with construction activities.</p><p>a) <strong>Monitoring Parameters</strong></p><p>The monitoring programme shall include, at a minimum, the following parameters <strong>(where applicable):</strong></p><ul><li>Surface water and groundwater quality (where works occur near water bodies);</li><li>Soil erosion and sediment control;</li><li>Waste generation, storage, and disposal practices;</li><li>Hazardous materials storage and handling;</li><li>Vegetation clearance and site disturbance;</li><li>Rehabilitation of disturbed areas;</li><li>Fuel and oil storage areas (including spill risks).</li></ul><p>&nbsp;</p><p>Environmental monitoring is essential to assess impacts such as air, water, soil, and noise pollution arising from construction activities and to ensure mitigation measures are effective.</p><p>&nbsp;</p><p>b) Monitoring Frequency and Methods</p><p>The Contractor shall:</p><ul><li>Conduct routine site inspections (daily and weekly as appropriate);</li><li>Carry out periodic quantitative monitoring (e.g. noise, dust) where risks justify;</li><li>Use appropriate, calibrated equipment for environmental measurements;</li><li>Establish baseline conditions where required;</li><li>Adjust monitoring frequency based on risk level and findings.</li></ul><p>&nbsp;</p><p>c) <strong>Environmental Registers and Records</strong></p><p>The Contractor shall maintain up-to-date records, including:</p><ul><li>Environmental monitoring results;</li><li>Waste tracking records (generation, transport, disposal);</li><li>Hazardous substances register (including MSDS);</li><li>Incident and spill records;</li><li>Complaints and grievance records related to environmental issues.</li></ul><p>&nbsp;</p><p>d) <strong>Reporting Requirements</strong></p><p>The Contractor shall:</p><ul><li>Submit monthly environmental monitoring reports to the Employer;</li><li>Include monitoring results, non-compliance issues, corrective actions, and trends;</li><li>Immediately (within 24 hours) report any significant environmental incident (e.g., spills, contamination events, major non-compliance);</li></ul><p>Maintain records for audit and inspection purposes.</p><p>e) <strong>Non-Compliance and Corrective Actions</strong></p><p>Where monitoring identifies non-compliance:</p><p>&nbsp;</p><ul><li>Immediate corrective action shall be implemented;</li><li>Root cause analysis shall be conducted;</li><li>Additional mitigation measures shall be introduced;</li><li>Follow-up monitoring shall confirm effectiveness of corrective measures.</li></ul><p>&nbsp;</p><p>f) <strong>Roles and Responsibilities</strong></p><p>&nbsp;</p><ul><li>The Environmental and Social Specialist (ESS) shall be responsible for implementation of the monitoring programme;</li><li>The ESS shall report directly to the Project Manager and liaise with the Employer Specialists;</li><li>All site personnel shall support monitoring activities and comply with environmental requirements.</li></ul><p>&nbsp;</p><p>A Rehabilitation Plan shall also be prepared, which shall include preliminary designs on the temporary and permanent landscaping plan during both the construction and post-construction maintenance period. The landscape plan shall cover all project works which may affect vegetation and natural landform (e.g. borrow pits, disposal sites and temporary and stockpiling areas). Sensitive locations and areas where landscaping works are required both during construction and after the construction shall be identified and incorporated into the design.</p><p><strong>3. Environmental and Social Implementation Plans (MSIPs) </strong></p><p>The Contractor shall prepare a Construction Environmental and Social Management Plan, implementation plan, referred to, in this document as CESMP implementation plan based on the Project ESMF.</p><p><strong>4. Requirements for competence of Environmental and Social Specialist </strong></p><p>Contractor shall certify that:</p><ul><li>ES Specialist shall be appointed and assigned duties throughout the period of the Contract connected with the environmental and social control activities on the Site.</li><li>The proposed ES Specialist shall be qualified and experienced to supervise and monitor compliance with the ESMF and CESMP and shall, in particular but without limitation, carry out auditing of the operation of the CESMP in accordance with a rolling program to be submitted, from time to time, to the Employer for his consent. The ES specialist should have an understanding of World Bank ESF requirements to which compliance to CESMP by the contractor shall be measured.</li></ul><p>&nbsp;</p><ul><li>ES Specialist shall not be removed from the site without the express written permission of the Employer. Within fourteen (14) days of any such removal or notice of intent of removal, a replacement ES Specialist shall be nominated for approval by the Employer.</li><li>ES Specialist shall be empowered to instruct employees of the Contractor and Subcontractors to cease operations and shall take the appropriate action as is necessary and within his limits of delegation by informing the Employer as may be appropriate to prevent unsafe working practices or other infringements of the Plan or other statutory regulations.</li><li>ES Specialists shall maintain a daily site diary comprehensively recording all relevant matters concerning site environmental and social management, safety and traffic control, inspections and audits, related incidents and the like. The site diary shall be available at all times for inspection by the Employer and his staff.</li></ul><p><strong>5. Applicable ESS Documents for CESMP </strong></p><p>Contractor shall use and apply when establishing the Contractor&rsquo;s (Construction) ESMP the following project documents:</p><ul><li>ESMF</li><li>Stakeholders Engagement Plan, Labor Management Plan, Grievance Redress Mechanism Procedure, A procedure for handling SEA/SH issues;</li><li>Occupational Community Health and Safety Implementation Plan (OCHSIP)</li><li>Environmental Authorization issued by the Eswatini Electricity Company</li><li>Applicable environmental and social laws of Kingdom of Eswatini;</li><li>World Bank&rsquo;s Environmental and Social Standards;</li><li>Good International Industrial Practices (ISO 9001, ISO 14001, ISO 45001, etc.);</li><li>Contractor&rsquo;s Method Statement developed based on Contractor specific tasks on construction sites;</li></ul><p><strong>6. ENVIRONMENTAL MANAGEMENT REQUIREMENTS</strong></p><p>The Contractor shall implement all environmental management measures in accordance with:</p><ul><li>World Bank Environmental and Social Framework (ESF), particularly ESS1 (Assessment and Management of Environmental and Social Risks and Impacts), ESS3 (Resource Efficiency and Pollution Prevention and Management), ESS4 (Community Health and Safety), and ESS6 (Sustainable Management of Living Natural Resources);</li><li>The Eswatini Environment Management Act (2002) and relevant Environmental Impact Assessment (EIA) Regulations;</li><li>Project Environmental and Social Management Framework (ESMF) and ESMP;</li><li>Good International Industry Practice (GIIP), including ISO 14001 Environmental Management Systems.</li></ul><p><strong>(a) Environmental Compliance and Permitting</strong></p><p>The Contractor shall:</p><ul><li>Ensure all required environmental approvals, licenses, and permits are obtained prior to commencement of works;</li><li>Comply with conditions of the Environmental Authorization issued for the project;</li><li>Adhere to all national environmental laws and standards on waste, emissions, water use, and pollution control.</li></ul><p><strong>(b) Pollution Prevention and Resource Efficiency &amp; Management (ESS3)</strong></p><p>The Contractor shall implement measures to prevent, minimize, and control pollution, including:</p><ul><li><strong>Air Quality Control</strong><ul><li>Suppress dust through water spraying and proper site management;</li><li>Maintain construction equipment to minimize exhaust emissions;</li></ul></li><li><strong>Noise and Vibration Control</strong><ul><li>Limit construction activities to approved working hours;</li><li>Use properly maintained equipment and silencers;</li></ul></li><li><strong>Water Protection</strong><ul><li>Prevent contamination of surface and groundwater;</li><li>Avoid discharge of untreated wastewater into the environment;</li></ul></li><li><strong>Hazardous Materials Management</strong><ul><li>Store fuels, oils, and chemicals in bunded areas;</li><li>Maintain Material Safety Data Sheets (MSDS) on-site;</li><li>Provide spill kits and train workers in spill response;</li></ul></li><li><strong>Waste Management</strong><ul><li>Apply waste hierarchy: reduce, reuse, recycle;</li><li>Separate hazardous and non-hazardous waste;</li><li>Dispose of waste only at approved facilities.</li></ul></li></ul><p>&nbsp;</p><p><strong>(c) Soil, Land and Vegetation Management</strong></p><p>The Contractor shall:</p><ul><li>Minimize land clearing and vegetation removal;</li><li>Restrict activities within designated work areas;</li><li>Prevent soil erosion through erosion control measures (e.g., silt fences, drainage control);</li><li>Restore disturbed areas to original or acceptable condition after construction;</li><li>Prevent invasive species introduction during rehabilitation.</li></ul><p><strong>d) </strong><strong>Biodiversity Conservation and Sustainable Management of Living Natural Resources</strong><strong>&nbsp; (ESS6)</strong></p><p>The Contractor shall:</p><ul><li>Avoid sensitive habitats and protected areas where feasible;</li><li>Prohibit hunting, poaching, and disturbance of wildlife by workers;</li><li>Implement a <strong>&ldquo;no-go&rdquo; policy</strong> in ecologically sensitive zones;</li><li>Immediately report any encounters with endangered species to authorities.</li></ul><p>&nbsp;</p><p><strong>e) Management of Construction Sites and Camps</strong></p><p>The Contractor shall:</p><ul><li>Ensure proper sanitation facilities are provided;</li><li>Prevent pollution from worker camps (wastewater, solid waste);</li><li>Avoid location of camps in environmentally sensitive areas;</li><li>Restore all temporary sites after demobilization.</li></ul><p>&nbsp;</p><p><strong>f) Traffic and Transport Management (ESS4 link)</strong></p><p>The Contractor shall:</p><ul><li>Minimize environmental and community impacts from transport activities;</li><li>Avoid fuel spills and dust generation along access roads;</li><li>Maintain vehicles to prevent leaks and emissions.</li></ul><p>&nbsp;</p><p><strong>g) Chance Finds Procedure (ESS8 link)</strong></p><p>In the event of chance finds (cultural or natural heritage):</p><ul><li>Stop work immediately;</li><li>Secure the site;</li><li>Notify relevant authorities;</li><li>Resume work only upon clearance.</li></ul><p>&nbsp;</p><p><strong>h) Environmental Training and Awareness</strong></p><p>The Contractor shall:</p><ul><li>Provide environmental induction training to all workers;</li><li>Conduct toolbox talks on environmental protection;</li><li>Ensure staff understand ESMP and CESMP requirements.</li></ul><p>&nbsp;</p><p><strong>i) Emergency Preparedness and Response</strong></p><p>The Contractor shall:</p><ul><li>Prepare environmental emergency response procedures;</li><li>Ensure availability of spill response equipment;</li><li>Train workers on emergency response actions.</li></ul><p>&nbsp;</p><p><strong>7. OCCUPATIONAL HEALTH &amp; SAFETY REQUIREMENTS </strong></p><p><strong><em>Health, Safety plan and Coordination </em></strong></p><p>The Contractor shall be fully responsible for ensuring the safety and health of all workmen and other persons in or around the works site. All activities shall be carried out in compliance with national legislation, OCHSIP, World Bank ESF, (ESS 2 and ESS 4) in accordance with the existing legislation.</p><p>&nbsp;</p><p>The Contractor shall prepare, submit, and implement a site-specific Occupational Health and Safety (OHS) Management Plan (SHE File) consistent with the OCHSIP, prior to commencement of works. The plan shall, at a minimum, include the following components:</p><p>&nbsp;</p><ul><li>Hazard identification and risk assessments</li><li>Prevention and protective measures</li><li>Safe work procedures and method statements</li><li>Training and competence</li><li>Incident reporting and management</li><li>Emergency preparedness and response</li><li>Occupational health and welfare measures</li><li>Community health and safety measures</li></ul><p>This plan must also be compliant with:</p><ul><li>The requirements of World Bank ESS 2 (Labour and Working Conditions and applicable provisions of ESS 4 (Community Health and Safety)</li><li>Application Eswatini National Legislation</li><li>EEC Integrated Management System</li><li>Occupational Community Health and Safety Implementation Plan (OCHSIP)</li><li>Good International Industrial Practices (ISO 9001, ISO 14001, ISO 45001, etc Any relevant Guidelines developed for the project and attached to this bidding document</li></ul><p>&nbsp;</p><p>Plan Scope and Content</p><p>The OHS Plan shall:</p><ul><li>Identify all project activities, associated risks, and mitigation measures, considering construction methods, equipment, environmental conditions, and site-specific factors;</li><li>Be aligned with the detailed construction schedule and address external influencing factors such as weather, traffic, and community interaction;</li><li>Include, at a minimum:</li><li>Organogram and roles/responsibilities for the safety team;</li><li>Incident reporting procedures and communication flow;</li><li>Emergency response procedures;</li><li>PPE specifications and usage requirements;</li><li>Site control and access management measures;</li><li>Training and communication arrangements;</li><li>Hazardous substances management (including MSDS);</li><li>Medical surveillance and occupational health provisions;</li><li>Pandemic and communicable disease contingency measures;</li><li>Coordination mechanisms with relevant authorities.</li></ul><p>The Draft OHS Plan submitted at tender stage shall demonstrate the Contractor&rsquo;s approach and capacity but may exclude detailed site-specific documentation (e.g., MSDS, equipment manuals). The Final OHS Plan, submitted prior to commencement of Works, shall be comprehensive and site-specific.</p><p><strong>8. Safety Management Personnel</strong></p><p>The Contractor shall appoint a qualified and experienced Safety and Health Coordinator (SHC) who shall:</p><p>Have full authority to enforce OHS requirements and to stop any unsafe work;</p><p>Be supported by an adequately resourced and competent safety team appropriate to the scale and risk of the Works.</p><p>The proposed SHC and safety team shall not be replaced or reduced without prior approval, and any replacement shall have equal or higher qualifications and experience.</p><p>&nbsp;</p><p>Evaluation of OHS Plan</p><p>The adequacy of the Contractor&rsquo;s OHS Plan will be evaluated during tender assessment, taking into account:</p><ul><li>Completeness and alignment with OCHSIP requirements;</li><li>Relevance to the specific scope of Works;</li><li>Competence and experience of the proposed SHC;</li><li>Adequacy of the safety organizational structure and resources.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>9. Social Standards Requirements</strong></p><p>The Contractor shall implement all social risk management measures in accordance with the World Bank Environmental and Social Framework (ESF), specifically <strong>ESS2 (Labour and Working Conditions), ESS4 (Community Health and Safety), ESS10 (Stakeholder Engagement and Information Disclosure) as well as the project&rsquo;s Gender Action Plan (GAP). </strong></p><p>The Contractor shall develop (in alignment with available project instruments) and comply with all project-specific instruments, including the:</p><ul><li>Labour Management Procedures (LMP)</li><li>Stakeholder Engagement Plan (SEP)</li><li>Resettlement Action Plan (RAP)</li><li>Grievance Redress Mechanism (GRM)</li><li>SEA/SH Action Plan</li></ul><p>These requirements shall be implemented as part of the Contractor&rsquo;s CESMP and maintained throughout the duration of the works</p><p>&nbsp;</p><p><strong>a) Labour and Working Conditions (ESS2)</strong></p><p>The Contractor shall:</p><ul><li>Ensure fair, transparent, and non-discriminatory employment practices</li><li>Actively encourage participation of women in both skilled and unskilled roles.</li><li>Provide workers with clear employment contracts outlining terms and conditions</li><li>Prohibit child labour, forced labour, and any form of exploitation</li><li>Establish and maintain a Workers&rsquo; Grievance Mechanism</li><li>Provide adequate welfare facilities, including sanitation, drinking water, and where applicable, suitable accommodation</li><li>Ensure all workers receive induction and regular training on:</li></ul><ul><li>Occupational health and safety</li><li>Code of conduct (including SEA/SH provisions)</li></ul><p><strong>b) Community Health and Safety (ESS4)</strong></p><p>The Contractor shall:</p><ul><li>Identify and assess risks and impacts to surrounding communities arising from construction activities</li><li>The Contractor shall carry out a pre-work site inspection and document the condition of properties through photographs before any construction activities begin in private properties.</li><li>Implement measures to manage the public&rsquo;s access to construction areas</li><li>Establish appropriate site security arrangements in line with principles of proportionality and good international practice</li><li>Prevent and respond to SEA/SH risks through awareness, codes of conduct, and reporting procedures</li><li>Maintain continuous communication/engagement with affected communities regarding ongoing works and risks</li><li>Respect property boundaries and prevent unnecessary damage to land, crops, or assets</li></ul><ul><li>The Contractor shall be responsible for compensating for any damage to property arising from its work or acts of negligence.</li></ul><p>&nbsp;</p><ul><li>Ensure that no work continues any damaged private property until compensation and measures have been completed.</li></ul><p>&nbsp;</p><ul><li>Ensure prompt reporting of any damage to property or assets during construction</li></ul><p><strong>d) Stakeholder Engagement and Information Disclosure (ESS10)</strong></p><p>The Contractor shall:</p><ul><li>Support implementation of the <strong>Stakeholder Engagement Plan (SEP)</strong></li><li>The Contractor shall engage and hold introductory consultations with traditional authorities in all communities before initiating any construction activities.</li><li>Maintain open, transparent, and continuous engagement with all stakeholders, including local communities.</li><li>Document all forms of engagements with communities, private property owners and update the contractor SEP as and when necessary.</li><li>Provide timely information regarding construction schedules, potential impacts, and mitigation measures</li><li>Ensure accessibility of the <strong>Grievance Redress Mechanism (GRM)</strong> for communities and workers</li><li>Record, track, and respond to all grievances in a timely manner.</li><li>Participate in community meetings and consultations as required by the Client.</li></ul><p><strong>e) Grievance Management and Reporting</strong></p><p>The Contractor shall:</p><ul><li>Maintain registers for:<ul><li>Community grievances</li><li>Worker grievances</li><li>Social incidents (including SEA/SH incidents)</li></ul></li><li>Ensure all grievances are acknowledged, investigated, and resolved within agreed timeframes</li><li>Report all social incidents and grievances to the Employer as part of regular reporting</li></ul><p><strong>f) Monitoring and Compliance</strong></p><p>The Contractor shall:</p><ul><li>Assign a qualified Social Specialist responsible for social &amp; Gender compliance</li><li>Conduct regular monitoring and internal audits of social performance</li><li>Submit periodic reports detailing:<ul><li>Stakeholder engagement activities</li><li>Grievances received and resolved</li><li>Labour and community-related incidents and grievances</li><li>Include gender inclusion indicators in regular project reporting</li></ul></li><li>Implement corrective actions for any identified non-compliance within agreed timelines</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Contractor&rsquo;s Representative and Key Personnel</strong></p><p>The Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements:</p><p><strong>Contractor&rsquo;s Representative and</strong> <strong>Key Personnel</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:60px\"><p><strong>Item No.</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:204px\"><p><strong>Position/specialization</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:183px\"><p><strong>Relevant academic qualifications</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:171px\"><p><strong>Minimum years of relevant work experience</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Contractor&rsquo;s Representative/ Project manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors in&nbsp; (Electrical Engineering)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>2.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Site Manager/ Construction Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Tele-Communication Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Protection Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>SCADA Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>6.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Environmental and Social expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors/Masters in Environment Management, Sciences</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>7.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Health and Safety officer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors in Environmental Sciences )/Any other degree with Occupational Health</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Forms and Procedures</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form of Completion Certificate</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>To: _________________________________</p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>Pursuant to GCC Clause 24 (Completion of the Facilities) of the General Conditions of the Contract entered into between yourselves and the Employer dated <em>_____________</em>, relating to the <em>____________________, </em>&nbsp;we hereby notify you that the following part(s) of the Facilities was (were) complete on the date specified below, and that, in accordance with the terms of the Contract, the Employer hereby takes over the said part(s) of the Facilities, together with the responsibility for care and custody and the risk of loss thereof on the date mentioned below.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Description of the Facilities or part thereof:&nbsp; <em>______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date of Completion:&nbsp; <em>__________________</em></p><p>However, you are required to complete the outstanding items listed in the attachment hereto as soon as practicable.</p><p>&nbsp;</p><p>This letter does not relieve you of your obligation to complete the execution of the Facilities in accordance with the Contract nor of your obligations during the Defect Liability Period.</p><p>&nbsp;</p><p>Very truly yours,</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Title</p><p>(Project Manager)<br /><strong>Form of Operational Acceptance Certificate</strong></p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p><em>_________________________________________</em></p><p>&nbsp;</p><p>To:&nbsp; <em>________________________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>&nbsp;</p><p>Pursuant to GCC Sub-Clause 25.3 (Operational Acceptance) of the General Conditions of the Contract entered into between yourselves and the Employer dated <em>_______________</em>, relating to the <em>___________________________________</em>, we hereby notify you that the Functional Guarantees of the following part(s) of the Facilities were satisfactorily attained on the date specified below.&nbsp;</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Description of the Facilities or part thereof:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date of Operational Acceptance:&nbsp; <em>_______________________</em></p><p>This letter does not relieve you of your obligation to complete the execution of the Facilities in accordance with the Contract nor of your obligations during the Defect Liability Period.</p><p>&nbsp;</p><p>Very truly yours,</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Title</p><p>(Project Manager)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Change Order Procedure and Forms</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>CONTENTS</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order Log</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; References for Changes</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>ANNEXES</p><p>&nbsp;</p><p>Annex 1&nbsp;&nbsp;&nbsp; Request for Change Proposal</p><p>Annex 2&nbsp;&nbsp;&nbsp; Estimate for Change Proposal</p><p>Annex 3&nbsp;&nbsp;&nbsp; Acceptance of Estimate</p><p>Annex 4&nbsp;&nbsp;&nbsp; Change Proposal</p><p>Annex 5&nbsp;&nbsp;&nbsp; Change Order</p><p>Annex 6&nbsp;&nbsp;&nbsp; Pending Agreement Change Order</p><p>Annex 7&nbsp;&nbsp;&nbsp; Application for Change Proposal</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Change Order Procedure</strong></p><p><strong>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General</strong></p><p>This section provides samples of procedures and forms for implementing changes in the Facilities during the performance of the Contract in accordance with GCC Clause 39 (Change in the Facilities) of the General Conditions.</p><p><strong>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order Log</strong></p><p>The Contractor shall keep an up-to-date Change Order Log to show the current status of Requests for Change and Changes authorized or pending, as Annex 8.&nbsp; Entries of the Changes in the Change Order Log shall be made to ensure that the log is up-to-date.&nbsp; The Contractor shall attach a copy of the current Change Order Log in the monthly progress report to be submitted to the Employer.</p><p><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; References for Changes</strong></p><p>(1)&nbsp;&nbsp;&nbsp; Request for Change as referred to in GCC Clause 39 shall be serially numbered CR-X-nnn.</p><p>(2)&nbsp;&nbsp;&nbsp; Estimate for Change Proposal as referred to in GCC Clause 39 shall be serially numbered CN-X-nnn.</p><p>(3)&nbsp;&nbsp;&nbsp; Acceptance of Estimate as referred to in GCC Clause 39 shall be serially numbered CA-X-nnn.</p><p>(4)&nbsp;&nbsp;&nbsp; Change Proposal as referred to in GCC Clause 39 shall be serially numbered CP-X-nnn.</p><p>(5)&nbsp;&nbsp;&nbsp; Change Order as referred to in GCC Clause 39 shall be serially numbered CO-X-nnn.</p><p>Note:&nbsp;&nbsp; (a)&nbsp;&nbsp;&nbsp; Requests for Change issued from the Employer&rsquo;s Home Office and the Site representatives of the Employer shall have the following respective references:</p><p>&nbsp;</p><p>Home Office&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CR-H-nnn</p><p>Site&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CR-S-nnn</p><p>&nbsp;</p><p>(b)&nbsp;&nbsp;&nbsp; The above number &ldquo;nnn&rdquo; is the same for Request for Change, Estimate for Change Proposal, Acceptance of Estimate, Change Proposal and Change Order.</p><p>&nbsp;</p><p><strong>Annex 1.&nbsp; Request for Change Proposal</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>____________________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>______________________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_________________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>With reference to the captioned Contract, you are requested to prepare and submit a Change Proposal for the Change noted below in accordance with the following instructions within <em>_______________ </em>days of the date of this letter<em>____________________</em>.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No. __________________</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>_______________________________</em></p><p>Contractor (by Application for Change Proposal No. <em>_______</em>[12]:&nbsp;</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_________________________________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of equipment related to the requested Change:&nbsp; <em>_____________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference drawings and/or technical documents for the request of Change:</p><p><u>Drawing No./Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Detailed conditions or special requirements on the requested Change:&nbsp; <em>________________</em></p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Terms and Conditions:</p><p>(a)&nbsp;&nbsp;&nbsp; Please submit your estimate to us showing what effect the requested Change will have on the Contract Price.</p><p>(b)&nbsp;&nbsp;&nbsp; Your estimate shall include your claim for the additional time, if any, for completion of the requested Change.</p><p>(c)&nbsp;&nbsp;&nbsp; If you have any opinion negative to the adoption of the requested Change in connection with the conformability to the other provisions of the Contract or the safety of the Plant or Facilities, please inform us of your opinion in your proposal of revised provisions.</p><p>(d)&nbsp;&nbsp;&nbsp; Any increase or decrease in the work of the Contractor relating to the services of its personnel shall be calculated.</p><p>(e)&nbsp;&nbsp;&nbsp; You shall not proceed with the execution of the work for the requested Change until we have accepted and confirmed the amount and nature in writing.</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 2.&nbsp; Estimate for Change Proposal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To: <em>______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_____________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>With reference to your Request for Change Proposal, we are pleased to notify you of the approximate cost of preparing the below-referenced Change Proposal in accordance with GCC Sub-Clause 39.2.1 of the General Conditions.&nbsp; We acknowledge that your agreement to the cost of preparing the Change Proposal, in accordance with GCC Sub-Clause 39.2.2, is required before estimating the cost for change work.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>____________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>__________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scheduled Impact of Change:&nbsp; <em>___________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cost for Preparation of Change Proposal:&nbsp; <em>_______________</em>[13]</p><p>(a)&nbsp;&nbsp;&nbsp; Engineering&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Amount)</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp; Engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs x <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr = &nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(ii)&nbsp;&nbsp;&nbsp; Draftsperson&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs x <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr =&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Sub-total&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total Engineering Cost&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(b)&nbsp;&nbsp;&nbsp; Other Cost&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total Cost (a) + (b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 3.&nbsp; Acceptance of Estimate</strong></p><p>&nbsp;</p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Attention:&nbsp; <em>________________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_____________________________</em></p><p>Contract Number:&nbsp; <em>___________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We hereby accept your Estimate for Change Proposal and agree that you should proceed with the preparation of the Change Proposal.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>___________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Estimate for Change Proposal No./Rev.:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Acceptance of Estimate No./Rev.:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other Terms and Conditions:&nbsp; In the event that we decide not to order the Change accepted, you shall be entitled to compensation for the cost of preparation of Change Proposal described in your Estimate for Change Proposal mentioned in para. 3 above in accordance with GCC Clause 39 of the General Conditions.</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name and Title of signatory)</p><p>&nbsp;</p><p><strong>Annex 4.&nbsp; Change Pr<strong>o</strong>posal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>In response to your Request for Change Proposal No. <em>_______________________________</em>, we hereby submit our proposal as follows:</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Proposal No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>[_______________________________</em></p><p>Contractor:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reasons for Change:&nbsp; <em>_______________________________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of Equipment related to the requested Change:&nbsp; <em>_______________________________</em></p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference drawings and/or technical documents for the requested Change:</p><p><u>Drawing/Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Estimate of increase/decrease to the Contract Price resulting from Change Proposal:[14]</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>(Amount)</u></p><p>&nbsp;</p><p>(a)&nbsp;&nbsp;&nbsp; Direct material&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(b)&nbsp;&nbsp;&nbsp; Major construction equipment&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(c)&nbsp;&nbsp;&nbsp; Direct field labor (Total <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;hrs)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(d)&nbsp;&nbsp;&nbsp; Subcontracts&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(e)&nbsp;&nbsp;&nbsp; Indirect material and labor&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; Site supervision&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(g)&nbsp;&nbsp;&nbsp; Head office technical staff salaries</p><p>Process engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Project engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Equipment engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Procurement&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Draftsperson&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>(h)&nbsp;&nbsp;&nbsp; Extraordinary costs (computer, travel, etc.)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp; Fee for general administration, <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;% of Items&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(j)&nbsp;&nbsp;&nbsp;&nbsp; Taxes and customs duties&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total lump sum cost of Change Proposal&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>(Sum of items (a) to (j))</em></p><p>Cost to prepare Estimate for Change Proposal&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>(Amount payable if Change is not accepted)</em></p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Additional time for Completion required due to Change Proposal</p><p>10.&nbsp;&nbsp;&nbsp; Effect on the Functional Guarantees</p><p>11.&nbsp;&nbsp;&nbsp; Effect on the other terms and conditions of the Contract</p><p>12.&nbsp;&nbsp;&nbsp; Validity of this Proposal:&nbsp; within <em>[Number]</em> days after receipt of this Proposal by the Employer</p><p>13.&nbsp;&nbsp;&nbsp; Other terms and conditions of this Change Proposal:</p><p>(a)&nbsp;&nbsp;&nbsp; You are requested to notify us of your acceptance, comments or rejection of this detailed Change Proposal within <em>______________ </em>days from your receipt of this Proposal.</p><p>(b)&nbsp;&nbsp;&nbsp; The amount of any increase and/or decrease shall be taken into account in the adjustment of the Contract Price.</p><p>(c)&nbsp;&nbsp;&nbsp; Contractor&rsquo;s cost for preparation of this Change Proposal:2</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 5.&nbsp; Change Order</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We approve the Change Order for the work specified in the Change Proposal (No. <em>_______</em>), and agree to adjust the Contract Price, Time for Completion and/or other conditions of the Contract in accordance with GCC Clause 39 of the General Conditions.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order No./Rev.:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>_______________________________</em></p><p>Contractor:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Authorized Price:</p><p>Ref. No.:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <em>__________________________</em></p><p>Foreign currency portion <em>__________</em>&nbsp; plus Local currency portion <em>__________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adjustment of Time for Completion</p><p>None&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Increase <em>_________</em> days&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Decrease <em>_________</em> days</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other effects, if any</p><p>&nbsp;</p><p>&nbsp;</p><p>Authorized by:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer)</p><p>&nbsp;</p><p>Accepted by:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor)<br /><strong>Annex 6.&nbsp; Pending Agreement Change Order</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Attention:&nbsp; <em>_______________________________</em></p><p>Contract Name: <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>[_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We instruct you to carry out the work in the Change Order detailed below in accordance with GCC Clause 39 of the General Conditions.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Employer&rsquo;s Request for Change Proposal No./Rev.:&nbsp; <em>_______________________________</em>dated:&nbsp; <em>__________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Change Proposal No./Rev.:&nbsp; <em>________________________ </em>dated:&nbsp; <em>__________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of equipment related to the requested Change:&nbsp; <em>_______________________________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference Drawings and/or technical documents for the requested Change:</p><p><u>Drawing/Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adjustment of Time for Completion:</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other change in the Contract terms:</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other terms and conditions:</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 7.&nbsp; Application for Change Proposal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>We hereby propose that the below-mentioned work be treated as a Change in the Facilities.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application for Change Proposal No./Rev.: <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; dated:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reasons for Change:</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Order of Magnitude Estimation (in the currencies of the Contract):</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scheduled Impact of Change:</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Effect on Functional Guarantees, if any:</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Appendix:</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Drawings</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Supplementary Information</strong></p><p><strong>The proposed locations of the auto-reclosers across the Eswatini Electricity Company network:</strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>The coordinates existing locations of the Communication High Sites across the Eswatini Electricity Company network can be found in this link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>PART 3 &ndash; Conditions of Contract and Contract Forms</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:613px\"><p><strong>Section VIII - General Conditions of Contract</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Table of Clauses</strong></p><p>&nbsp;</p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contract and Interpretation. 193</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions. 193</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contract Documents. 196</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interpretation. 196</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communications. 198</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Law and Language. 198</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fraud and Corruption. 198</p><p><strong>B.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Subject Matter of Contract 199</strong></p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Facilities. 199</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Time for Commencement and Completion. 200</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Responsibilities. 200</p><p>10.&nbsp;&nbsp;&nbsp; Employer&rsquo;s Responsibilities. 204</p><p><strong>C.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payment 206</strong></p><p>11.&nbsp;&nbsp;&nbsp; Contract Price. 206</p><p>12.&nbsp;&nbsp;&nbsp; Terms of Payment 206</p><p>13.&nbsp;&nbsp;&nbsp; Securities. 206</p><p>14.&nbsp;&nbsp;&nbsp; Taxes and Duties. 208</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Intellectual Property. 209</strong></p><p>15.&nbsp;&nbsp;&nbsp; License/Use of Technical Information. 209</p><p>16.&nbsp;&nbsp;&nbsp; Confidential Information. 209</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Execution of the Facilities. 210</strong></p><p>17.&nbsp;&nbsp;&nbsp; Representatives. 210</p><p>18.&nbsp;&nbsp;&nbsp; Work Program.. 212</p><p>19.&nbsp;&nbsp;&nbsp; Subcontracting. 215</p><p>20.&nbsp;&nbsp;&nbsp; Design and Engineering. 216</p><p>21.&nbsp;&nbsp;&nbsp; Procurement 218</p><p>22.&nbsp;&nbsp;&nbsp; Installation. 220</p><p>23.&nbsp;&nbsp;&nbsp; Test and Inspection. 232</p><p>24.&nbsp;&nbsp;&nbsp; Completion of the Facilities. 234</p><p>25. &nbsp;&nbsp; Commissioning and Operational Acceptance. 236</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Guarantees and Liabilities. 239</strong></p><p>26.&nbsp;&nbsp;&nbsp; Completion Time Guarantee. 239</p><p>27.&nbsp;&nbsp;&nbsp; Defect Liability. 240</p><p>28.&nbsp;&nbsp;&nbsp; Functional Guarantees. 242</p><p>29.&nbsp;&nbsp;&nbsp; Patent Indemnity. 243</p><p>30.&nbsp;&nbsp;&nbsp; Limitation of Liability. 245</p><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Risk Distribution. 245</strong></p><p>31.&nbsp;&nbsp;&nbsp; Transfer of Ownership. 245</p><p>32.&nbsp;&nbsp;&nbsp; Care of Facilities. 246</p><p>33.&nbsp;&nbsp;&nbsp; Loss of or Damage to Property; Accident or Injury to Workers; Indemnification. 247</p><p>34.&nbsp;&nbsp;&nbsp; Insurance. 248</p><p>35.&nbsp;&nbsp;&nbsp; Unforeseen Conditions. 251</p><p>36.&nbsp;&nbsp;&nbsp; Change in Laws and Regulations. 252</p><p>37.&nbsp;&nbsp;&nbsp; Force Majeure. 252</p><p>38.&nbsp;&nbsp;&nbsp; War Risks. 254</p><p><strong>H.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change in Contract Elements. 255</strong></p><p>39.&nbsp;&nbsp;&nbsp; Change in the Facilities. 255</p><p>40.&nbsp;&nbsp;&nbsp; Extension of Time for Completion. 259</p><p>41.&nbsp;&nbsp;&nbsp; Suspension. 260</p><p>42.&nbsp;&nbsp;&nbsp; Termination. 262</p><p>43.&nbsp;&nbsp;&nbsp; Assignment 269</p><p>44. &nbsp;&nbsp; Export Restrictions. 269</p><p><strong>I.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Claims, Disputes and Arbitration. 269</strong></p><p>45.&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Claims. 269</p><p>46. &nbsp;&nbsp; Disputes and Arbitration. 271</p><p>47. &nbsp;&nbsp; Cyber Security. 275</p><p>&nbsp;</p><p><strong>General Conditions of Contract</strong></p><ol><li><strong>Contract and Interpretation</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:643px\"><tbody><tr><td style=\"height:174px; vertical-align:top; width:142px\"><p><strong>1.&nbsp;&nbsp;&nbsp; Definitions</strong></p></td><td colspan=\"3\" style=\"height:174px; vertical-align:top; width:501px\"><p>1.1&nbsp;&nbsp;&nbsp;&nbsp; The following words and expressions shall have the meanings hereby assigned to them:</p><p><strong>&ldquo;Contract&rdquo;</strong> means the Contract Agreement entered into between the Employer and the Contractor, together with the Contract Documents referred to therein; they shall constitute the Contract, and the term &ldquo;the Contract&rdquo; shall in all such documents be construed accordingly.</p><p><strong>&ldquo;Contract Documents&rdquo;</strong> means the documents listed in Article 1.1 (Contract Documents) of the Contract Agreement (including any amendments thereto).</p><p><strong>&ldquo;GCC&rdquo;</strong> means the General Conditions of Contract hereof.</p><p>&ldquo;<strong>PCC&rdquo;</strong> means the Particular Conditions of Contract.</p><p><strong>&ldquo;day&rdquo;</strong> means calendar day.</p><p><strong>&ldquo;year&rdquo;</strong> means 365 days.</p><p><strong>&ldquo;month&rdquo;</strong> means calendar month.</p><p>&ldquo;<strong>Party&rdquo;</strong> means the Employer or the Contractor, as the context requires, and &ldquo;Parties&rdquo; means both of them.</p><p><strong>&ldquo;Employer&rdquo;</strong> means the person <strong>named as such in the PCC</strong> and includes the legal successors or permitted assigns of the Employer.</p><p><strong>&ldquo;Project Manager&rdquo;</strong> means the person appointed by the Employer in the manner provided in GCC Sub-Clause 17.1 (Project Manager) hereof and <strong>named as such in the PCC</strong> to perform the duties delegated by the Employer.</p><p><strong>&ldquo;Contractor&rdquo;</strong> means the person(s) whose Bid to perform the Contract has been accepted by the Employer and is named as Contractor in the Contract Agreement, and includes the legal successors or permitted assigns of the Contractor.</p><p><strong>&ldquo;Contractor&rsquo;s Representative&rdquo;</strong> means any person nominated by the Contractor and approved by the Employer in the manner provided in GCC Sub-Clause 17.2 (Contractor&rsquo;s Representative and Construction Manager) hereof to perform the duties delegated by the Contractor.</p><p><strong>&ldquo;Construction Manager&rdquo;</strong> means the person appointed by the Contractor&rsquo;s Representative in the manner provided in GCC Sub-Clause 17.2.4.&nbsp;</p><p><strong>&ldquo;Subcontractor,&rdquo;</strong> including manufacturers, means any person to whom execution of any part of the Facilities, including preparation of any design or supply of any Plant, is sub-contracted directly or indirectly by the Contractor, and includes its legal successors or permitted assigns.</p><p><strong>&ldquo;Dispute Board&rdquo; (DB)</strong> means the person or persons named as such in the PCC appointed by agreement between the Employer and the Contractor to make a decision with respect to any dispute or difference between the Employer and the Contractor referred to him or her by the Parties pursuant to GCC Sub-Clause 46.1 (Dispute Board) hereof.</p><p><strong>&ldquo;The Bank&rdquo;</strong> means the financing institution <strong>named in the PCC.</strong></p><p><strong>&ldquo;Contract Price&rdquo;</strong> means the sum specified in Article 2.1 (Contract Price) of the Contract Agreement, subject to such additions and adjustments thereto or deductions therefrom, as may be made pursuant to the Contract.</p><p><strong>&ldquo;Facilities&rdquo;</strong> means the Plant to be supplied and installed, as well as all the Installation Services to be carried out by the Contractor under the Contract.</p><p><strong>&ldquo;Plant&rdquo;</strong> means permanent plant, equipment, machinery, apparatus, materials, articles and things of all kinds to be provided and incorporated in the Facilities by the Contractor under the Contract (including the spare parts to be supplied by the Contractor under GCC Sub-Clause 7.3 hereof), but does not include Contractor&rsquo;s Equipment.</p><p><strong>&ldquo;Installation Services&rdquo;</strong> means all those services ancillary to the supply of the Plant for the Facilities, to be provided by the Contractor under the Contract, such as transportation and provision of marine or other similar insurance, inspection, expediting, site preparation works (including the provision and use of Contractor&rsquo;s Equipment and the supply of all construction materials required), installation, testing, precommissioning, commissioning, operations, maintenance, the provision of operations and maintenance manuals, training, etc&hellip; as the case may require.</p><p><strong>&ldquo;Contractor&rsquo;s Equipment&rdquo;</strong> means all facilities, equipment, machinery, tools, apparatus, appliances or things of every kind required in or for installation, completion and maintenance of Facilities that are to be provided by the Contractor, but does not include Plant, or other things intended to form or forming part of the Facilities.</p><p><strong>&ldquo;Country of Origin&rdquo;</strong> means the countries and territories eligible under the rules of the Bank as further <strong>elaborated in the PCC.</strong></p><p><strong>&ldquo;Site&rdquo;</strong> means the land and other places upon which the Facilities are to be installed, and such other land or places as may be specified in the Contract as forming part of the Site.</p><p><strong>&ldquo;Effective Date&rdquo;</strong> means the date of fulfillment of all conditions stated in Article 3 (Effective Date) of the Contract Agreement, from which the Time for Completion shall be counted.</p><p><strong>&ldquo;Time for Completion&rdquo;</strong> means the time within which Completion of the Facilities as a whole (or of a part of the Facilities where a separate Time for Completion of such part has been prescribed) is to be attained, as referred to in GCC Clause 8 and in accordance with the relevant provisions of the Contract.</p><p><strong>&ldquo;Completion&rdquo;</strong> means that the Facilities (or a specific part thereof where specific parts are specified in the Contract) have been completed operationally and structurally and put in a tight and clean condition, that all work in respect of Precommissioning of the Facilities or such specific part thereof has been completed, and that the Facilities or specific part thereof are ready for Commissioning as provided in GCC Clause 24 (Completion) hereof.</p><p><strong>&ldquo;Precommissioning</strong>&rdquo; means the testing, checking and other requirements specified in the Employer&rsquo;s Requirements that are to be carried out by the Contractor in preparation for Commissioning as provided in GCC Clause 24 (Completion) hereof.</p><p><strong>&ldquo;Commissioning&rdquo;</strong> means operation of the Facilities or any part thereof by the Contractor following Completion, which operation is to be carried out by the Contractor as provided in GCC Sub-Clause 25.1 (Commissioning) hereof, for the purpose of carrying out Guarantee Test(s).</p><p><strong>&ldquo;Guarantee Test(s)&rdquo;</strong> means the test(s) specified in the Employer&rsquo;s Requirements to be carried out to ascertain whether the Facilities or a specified part thereof is able to attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, in accordance with the provisions of GCC Sub-Clause 25.2 (Guarantee Test) hereof.</p><p><strong>&ldquo;Operational Acceptance&rdquo;</strong> means the acceptance by the Employer of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor&rsquo;s fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.</p><p><strong>&ldquo;Defect Liability Period&rdquo;</strong> means the period of validity of the warranties given by the Contractor commencing at Completion of the Facilities or a part thereof, during which the Contractor is responsible for defects with respect to the Facilities (or the relevant part thereof) as provided in GCC Clause 27 (Defect Liability) hereof.</p><p><strong>&ldquo;ES&rdquo;</strong> means Environmental and Social (including Sexual Exploitation and Abuse (SEA), and Sexual Harassment (SH)).</p><p><strong>&ldquo;Sexual Exploitation and Abuse&rdquo; &ldquo;(SEA)&rdquo;</strong> means the following:</p><p><strong>Sexual Exploitation</strong> is defined as any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another.</p><p><strong>Sexual Abuse</strong> is defined as the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions;</p><p><strong>&ldquo;Sexual Harassment&rdquo; &ldquo;(SH)&rdquo;</strong> is defined as unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature by the Contractor&rsquo;s Personnel with other Contractor&rsquo;s Personnel or Employer&rsquo;s Personnel.</p><p><strong>&ldquo;Contractor&rsquo;s Personnel&rdquo;</strong> means<strong> </strong>all personnel whom the Contractor utilizes in the execution of the Contract, including the staff, labor and other employees of the Contractor and each Subcontractor; and any other personnel assisting the Contractor in the execution of the Contract; and</p><p><strong>&nbsp;&ldquo;Employer&rsquo;s Personnel&rdquo;</strong> means<strong> </strong>all staff, labor and other employees of the Project Manager and of the Employer<strong> </strong>engaged in fulfilling the Employer&rsquo;s obligations under the Contract; and any other personnel identified as Employer&rsquo;s Personnel, by a notice from the Employer to the Contractor.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>2.&nbsp;&nbsp;&nbsp; Contract Documents</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>2.1&nbsp;&nbsp;&nbsp;&nbsp; Subject to Article 1.2 (Order of Precedence) of the Contract Agreement, all documents forming part of the Contract (and all parts thereof) are intended to be correlative, complementary and mutually explanatory.&nbsp; The Contract shall be read as a whole.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>3.&nbsp;&nbsp;&nbsp; Interpretation</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>3.1&nbsp;&nbsp;&nbsp;&nbsp; In the Contract, except where the context requires otherwise:</p><ol><li>words indicating one gender include all genders;</li><li>words indicating the singular also include the plural and words indicating the plural also include the singular;</li><li>provisions including the word &ldquo;agree,&rdquo; &ldquo;agreed,&rdquo; or &ldquo;agreement&rdquo; require the agreement to be recorded in writing;</li><li>the word &ldquo;tender&rdquo; is synonymous with &ldquo;Bid,&rdquo; &ldquo;tenderer,&rdquo; with &ldquo;Bidder,&rdquo; and &ldquo;tender documents&rdquo; with &ldquo;Bidding &nbsp;Document,&rdquo; and</li><li>&ldquo;written&rdquo; or &ldquo;in writing&rdquo; means hand-written, type-written, printed or electronically made, and resulting in a permanent record.</li></ol><p>The marginal words and other headings shall not be taken into consideration in the interpretation of these Conditions.</p><p>3.2&nbsp;&nbsp;&nbsp;&nbsp; <u>Incoterms</u></p><p>Unless inconsistent with any provision of the Contract, the meaning of any trade term and the rights and obligations of Parties thereunder shall be as prescribed by <em>Incoterms</em>.</p><p>Incoterms means international rules for interpreting trade terms published by the International Chamber of Commerce (latest edition), 38 Cours Albert 1er, 75008 Paris, France.</p><p>3.3&nbsp;&nbsp;&nbsp;&nbsp; <u>Entire Agreement</u></p><p>Subject to GCC Sub-Clause 16.4 hereof, the Contract constitutes the entire agreement between the Employer and Contractor with respect to the subject matter of Contract and supersedes all communications, negotiations and agreements (whether written or oral) of Parties with respect thereto made prior to the date of Contract.</p><p>3.4&nbsp;&nbsp;&nbsp;&nbsp; <u>Amendment</u></p><p>No amendment or other variation of the Contract shall be effective unless it is in writing, is dated, expressly refers to the Contract, and is signed by a duly authorized representative of each Party hereto.</p><p>3.5&nbsp;&nbsp;&nbsp;&nbsp; <u>Independent Contractor</u></p><p>The Contractor shall be an independent contractor performing the Contract.&nbsp; The Contract does not create any agency, partnership, joint venture or other joint relationship between the Parties hereto. Subject to the provisions of the Contract, the Contractor shall be solely responsible for the manner in which the Contract is performed.&nbsp; All employees, representatives or Subcontractors engaged by the Contractor in connection with the performance of the Contract shall be under the complete control of the Contractor and shall not be deemed to be employees of the Employer, and nothing contained in the Contract or in any subcontract awarded by the Contractor shall be construed to create any contractual relationship between any such employees, representatives or Subcontractors and the Employer.</p><p>3.6&nbsp;&nbsp;&nbsp;&nbsp; <u>Non-Waiver</u></p><p>3.6.1&nbsp; Subject to GCC Sub-Clause 3.6.2 below, no relaxation, forbearance, delay or indulgence by either Party in enforcing any of the terms and conditions of the Contract or the granting of time by either Party to the other shall prejudice, affect or restrict the rights of that Party under the Contract, nor shall any waiver by either Party of any breach of Contract operate as waiver of any subsequent or continuing breach of Contract.</p><p>3.6.2&nbsp; Any waiver of a Party&rsquo;s rights, powers or remedies under the Contract must be in writing, must be dated and signed by an authorized representative of the Party granting such waiver, and must specify the right and the extent to which it is being waived.</p><p>3.7&nbsp;&nbsp;&nbsp;&nbsp; <u>Severability</u></p><p>If any provision or condition of the Contract is prohibited or rendered invalid or unenforceable, such prohibition, invalidity or unenforceability shall not affect the validity or enforceability of any other provisions and conditions of the Contract.</p><p>3.8&nbsp;&nbsp;&nbsp;&nbsp; <u>Country of Origin</u></p><p>&ldquo;Origin&rdquo; means the place where the plant and component parts thereof are mined, grown, produced or manufactured, and from which the services are provided. Plant components are produced when, through manufacturing, processing, or substantial or major assembling of components, a commercially recognized product results that is substantially different in its basic characteristics or in purpose or utility from its components.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>4.&nbsp;&nbsp;&nbsp; Communica&shy;tions</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>4.1&nbsp;&nbsp;&nbsp;&nbsp; Wherever these Conditions provide for the giving or issuing of approvals, certificates, consents, determinations, notices, requests and discharges, these communications shall be:</p><ol><li>in writing and delivered against receipt; and</li><li>delivered, sent or transmitted to the address for the recipient&rsquo;s communications as stated in the Contract Agreement.</li></ol><p>When a certificate is issued to a Party, the certifier shall send a copy to the other Party. When a notice is issued to a Party, by the other Party or the Project Manager, a copy shall be sent to the Project Manager or the other Party, as the case may be.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>5.&nbsp;&nbsp;&nbsp; Law and Language</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>5.1&nbsp;&nbsp;&nbsp;&nbsp; The Contract shall be governed by and interpreted in accordance with laws of the country <strong>specified in the PCC.</strong></p><ol><li><ol><li>The ruling language of the Contract shall be that <strong>stated in the PCC.</strong></li><li>The language for communications shall be the ruling language unless otherwise <strong>stated in the PCC.</strong></li></ol></li></ol></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>6.&nbsp;&nbsp;&nbsp; Fraud and Corruption </strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><ol><li><ol><li>The Bank requires compliance with the Bank&rsquo;s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework, as set forth in Appendix B to the GCC.</li><li>The Employer requires the Contractor to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the Bidding process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee.</li></ol></li></ol></td></tr><tr><td colspan=\"4\" style=\"vertical-align:top; width:643px\"><ol><li><strong>Subject Matter of Contract</strong></li></ol></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>7.&nbsp;&nbsp;&nbsp; Scope of Facilities</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>7.1&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise expressly limited in the Employer&rsquo;s Requirements, the Contractor&rsquo;s obligations cover the provision of all Plant and the performance of all Installation Services required for the design, and the manufacture (including procurement, quality assurance, construction, installation, associated civil works, Precommissioning and delivery) of the Plant, and the installation, completion and commissioning of the Facilities in accordance with the plans, procedures, specifications, drawings, codes and any other documents as specified in the Section, Employer&rsquo;s Requirements.&nbsp; Such specifications include, but are not limited to, the provision of supervision and engineering services; the supply of labor, materials, equipment, spare parts (as specified in GCC Sub-Clause 7.3 below) and accessories; Contractor&rsquo;s Equipment; construction utilities and supplies; temporary materials, structures and facilities; transportation (including, without limitation, unloading and hauling to, from and at the Site); and storage, except for those supplies, works and services that will be provided or performed by the Employer, as set forth in the&nbsp; Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer.</p><p>7.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall, unless specifically excluded in the Contract, perform all such work and/or supply all such items and materials not specifically mentioned in the Contract but that can be reasonably inferred from the Contract as being required for attaining Completion of the Facilities as if such work and/or items and materials were expressly mentioned in the Contract.</p><p>7.3&nbsp;&nbsp;&nbsp;&nbsp; In addition to the supply of Mandatory Spare Parts included in the Contract, the Contractor agrees to supply spare parts required for the operation and maintenance of the Facilities for the period <strong>specified in the PCC</strong> and the provisions, if any, <strong>specified in the PCC. </strong>&nbsp;However, the identity, specifications and quantities of such spare parts and the terms and conditions relating to the supply thereof are to be agreed between the Employer and the Contractor, and the price of such spare parts shall be that given in Price Schedule No. 6, which shall be added to the Contract Price.&nbsp; The price of such spare parts shall include the purchase price therefor and other costs and expenses (including the Contractor&rsquo;s fees) relating to the supply of spare parts.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>8.&nbsp;&nbsp;&nbsp; Time for Commence&shy;ment and Completion</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>8.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall commence work on the Facilities within the period <strong>specified in the PCC</strong> and without prejudice to GCC Sub-Clauses 9.9 and 26.2 hereof, the Contractor shall thereafter proceed with the Facilities in accordance with the time schedule specified in the Appendix to the Contract Agreement titled Time Schedule.</p><p>8.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall attain Completion of the Facilities or of a part where a separate time for Completion of such part is specified in the Contract, within the time <strong>stated in the PCC </strong>or within such extended time to which the Contractor shall be entitled under GCC Clause 40 hereof.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"height:53px; vertical-align:top; width:153px\"><p><strong>9.&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Responsibilities</strong></p></td><td style=\"height:53px; vertical-align:top; width:489px\"><p>9.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall design, manufacture including associated purchases and/or subcontracting, install and complete the Facilities in accordance with the Contract. When completed, the Facilities should be fit for the purposes for which they are intended as defined in the Contract.</p><p>9.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor confirms that it has entered into this Contract on the basis of a proper examination of the data relating to the Facilities including any data as to boring tests provided by the Employer, and on the basis of information that the Contractor could have obtained from a visual inspection of the Site if access thereto was available and of other data readily available to it relating to the Facilities as of the date twenty-eight (28) days prior to Bid submission.&nbsp; The Contractor acknowledges that any failure to acquaint itself with all such data and information shall not relieve its responsibility for properly estimating the difficulty or cost of successfully performing the Facilities.</p><p>9.3&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which such authorities or undertakings require the Contractor to obtain in its name and which are necessary for the performance of the Contract, including, without limitation, visas for the Contractor&rsquo;s Personnel and entry permits for all imported Contractor&rsquo;s Equipment.&nbsp; The Contractor shall acquire all other permits, approvals and/or licenses that are not the responsibility of the Employer under GCC Sub-Clause 10.3 hereof and that are necessary for the performance of the Contract.</p><p>9.4&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall comply with all laws in force in the country where the Facilities are to be implemented.&nbsp; The laws will include all local, state, national or other laws that affect the performance of the Contract and bind upon the Contractor.&nbsp; The Contractor shall indemnify and hold harmless the Employer from and against any and all liabilities, damages, claims, fines, penalties and expenses of whatever nature arising or resulting from the violation of such laws by the Contractor or its personnel, including the Subcontractors and their personnel, but without prejudice to GCC Sub-Clause 10.1 hereof.</p><p>9.5&nbsp;&nbsp;&nbsp;&nbsp; Any Plant and Installation Services that will be incorporated in or be required for the Facilities and other supplies shall have their origin as specified under GCC Clause 1 (Country of Origin). Any subcontractors retained by the Contractor shall be from a country as specified in GCC Clause 1 (Country of Origin).</p><p>9.6&nbsp;&nbsp;&nbsp;&nbsp; If the Contractor is a joint venture, or association (JV) of two or more persons, all such persons shall be jointly and severally bound to the Employer for the fulfillment of the provisions of the Contract, and shall designate one of such persons to act as a leader with authority to bind the JV. The composition or the constitution of the JV shall not be altered without the prior consent of the Employer.</p><p>9.7&nbsp;&nbsp;&nbsp;&nbsp; Pursuant to paragraph 2.2 e. of Appendix B to the General Conditions the Contractor shall permit and shall cause its agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit, the Bank and/or persons appointed by the Bank to inspect the site and/or the accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have such accounts, records and other documents audited by auditors appointed by the Bank. The Contractor&rsquo;s and its Subcontractors&rsquo; and subconsultants&rsquo; attention is drawn to Sub-Clause 6.1 (Fraud and Corruption) which provides, inter alia, that acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank&rsquo;s prevailing sanctions procedures).</p><p>9.8 The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the PCC.</p><p>9.9&nbsp;&nbsp; Contractor&rsquo;s Environmental and Social Management Plan (C-ESMP)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>The Contractor shall not carry out mobilization to Site unless the Project Manager gives approval, an approval that &nbsp;shall not be unreasonably delayed, to the measures the Contractor proposes to address environmental and social risks and impacts including the code of conduct, in accordance with GCC Sub-Clause&nbsp; 22.4.</p><p>The Contractor shall submit, to the Project Manager for Review, any additional Management Strategies and Implementation Plans as are necessary to manage the ES risks and impacts of the Facilities. These Management Strategies and Implementation Plans collectively comprise the Contractor&rsquo;s Environmental and Social Management Plan (C-ESMP).</p><p>The Contractor shall review the C-ESMP, periodically (but not less than every six (6) months), and update it as required to ensure that it contains measures appropriate to the Facilities. The updated C-ESMP shall be submitted to the Project Manager for its approval.</p><p>9.10 &nbsp;Training of Contractor&rsquo;s Personnel</p><p>The Contractor shall provide appropriate training to relevant Contractor&rsquo;s Personnel on ES aspects of the Contract, including appropriate sensitization on prohibition of SEA and health and safety training referred to in GCC Sub-Clause 22.2.7.&nbsp;</p><p>As stated in the Employer&rsquo;s Requirements or as instructed by the Project Manager, the Contractor shall also allow appropriate opportunities for the relevant Contractor&rsquo;s Personnel to be trained on ES aspects of the Contract by the Employer&rsquo;s personnel and/or other personnel assigned by the Employer.</p><p>9.11 Stakeholder engagements</p><p>The Contractor shall provide relevant contract- related information, as the Employer and/or Project Manager may reasonably request to conduct contract stakeholder engagement. &ldquo;Stakeholder&rdquo; refers to individuals or groups who:</p><ol><li><ol><li><ol><li>are affected or likely to be affected by the Contract; and</li><li>may have an interest in the Contract.</li></ol></li></ol></li></ol><p>The Contractor may also directly participate in contract stakeholder engagements, as the Employer and/or Project Manager may reasonably request.</p><p>9.12&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Forced Labor</p><p>The Contractor, including its Subcontractors, shall not employ or engage forced labour. Forced labour consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.</p><p>No persons shall be employed or engaged who have been subject to trafficking. Trafficking in persons is defined as the recruitment, transportation, transfer, harbouring or receipt of persons by means of the threat or use of force or other forms of coercion, abduction, fraud, deception, abuse of power, or of a position of vulnerability, or of the giving or receiving of payments or benefits to achieve the consent of a person having control over another person, for the purposes of exploitation.</p><p>The Contractor shall also take measures to require its suppliers (other than Subcontractors) not to employ or engage forced labour including trafficked persons. If forced labour/trafficking cases are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.13&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Child Labor</u></p><p>The Contractor, including its Subcontractors, shall not employ or engage a child under the age of 14 unless the national law specifies a higher age (the minimum age).</p><p>The Contractor, including its Subcontractors, shall not employ or engage a child between the minimum age and the age of 18 in a manner that is likely to be hazardous, or to interfere with, the child&rsquo;s education, or to be harmful to the child&rsquo;s health or physical, mental, spiritual, moral, or social development.</p><p>The Contractor including its Subcontractors, shall only employ or engage children between the minimum age and the age of 18 after an appropriate risk assessment has been conducted by the Contractor with the Engineer&rsquo;s consent. The Contractor shall be subject to regular monitoring by the Project Manager that includes monitoring of health, working conditions and hours of work.</p><p>Work considered hazardous for children is work that, by its nature or the circumstances in which it is carried out, is likely to jeopardize the health, safety, or morals of children. Such work activities prohibited for children include work:</p><ol><li>with exposure to physical, psychological or sexual abuse;</li><li>underground, underwater, working at heights or in confined spaces;</li><li>with dangerous machinery, equipment or tools, or involving handling or transport of heavy loads;</li><li>in unhealthy environments exposing children to hazardous substances, agents, or processes, or to temperatures, noise or vibration damaging to health; or</li><li>under difficult conditions such as work for long hours, during the night or in confinement on the premises of the employer.</li></ol><p>The Contractor shall also take measures to require its suppliers (other than Subcontractors) not to employ or engage child labor. If child labor cases are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.14&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Serious Safety Issues</p><p>The Contractor, including its Subcontractors, shall comply with all applicable safety obligations. The Contractor shall also take measures to require its suppliers (other than Subcontractors) to adopt procedures and mitigation measures adequate to address safety issues related to their personnel. If serious safety issues are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.15&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Obtaining natural resource materials</u></p><p>The Contractor shall obtain natural resource materials&nbsp; from suppliers&nbsp; that can demonstrate, through compliance with the applicable verification&nbsp; and/ or certification requirements, that obtaining such materials is not contributing to the risk of significant conversion or significant degradation of natural or critical habitats such as unsustainably harvested wood products, gravel or sand extraction from riverbeds or beaches.</p><p>If a supplier cannot continue to demonstrate that obtaining such materials is not contributing to the risk of significant conversion or significant degradation of natural or critical habitats, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to demonstrate that they are not significantly adversely impacting the habitats.</p><p>9.16&nbsp;&nbsp; Site Signage</p><p>The Contractor shall not post and shall ensure that its Subcontractors/suppliers/manufacturers and Contractors&rsquo; Personnel shall not post, any signage on the Site, or in any other place where the Works will be carried out, except such signage as is required under the Contract, including by the Laws of the Country, or has been approved by the Employer. For the purposes of this sub-clause, signage shall include, inter alia, flags, billboards, advertising materials and any other similar item separately posted on the Site.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>10.&nbsp; Employer&rsquo;s Responsibilities</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>10.1&nbsp;&nbsp; All information and/or data to be supplied by the Employer as described in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, shall be deemed to be accurate, except when the Employer expressly states otherwise.</p><p>10.2&nbsp;&nbsp; The Employer shall be responsible for acquiring and providing legal and physical possession of the Site and access thereto, and for providing possession of and access to all other areas reasonably required for the proper execution of the Contract, including all requisite rights of way, as specified in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer.&nbsp; The Employer shall give full possession of and accord all rights of access thereto on or before the date(s) specified in that Appendix.</p><p>10.3&nbsp;&nbsp; The Employer shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which (a) such authorities or undertakings require the Employer to obtain in the Employer&rsquo;s name, (b) are necessary for the execution of the Contract, including those required for the performance by both the Contractor and the Employer of their respective obligations under the Contract, and (c) are specified in the&nbsp; Appendix&nbsp; (Scope of Works and Supply by the Employer).</p><p>10.4&nbsp;&nbsp; If requested by the Contractor, the Employer shall use its best endeavors to assist the Contractor in obtaining in a timely and expeditious manner all permits, approvals and/or licenses necessary for the execution of the Contract from all local, state or national government authorities or public service undertakings that such authorities or undertakings require the Contractor or Subcontractors or the personnel of the Contractor or Subcontractors, as the case may be, to obtain.</p><p>10.5&nbsp;&nbsp; Unless otherwise specified in the Contract or agreed upon by the Employer and the Contractor, the Employer shall provide sufficient, properly qualified operating and maintenance personnel; shall supply and make available all raw materials, utilities, lubricants, chemicals, catalysts, other materials and facilities; and shall perform all work and services of whatsoever nature, including those required by the Contractor to properly carry out Precommissioning, Commissioning and Guarantee Tests, all in accordance with the provisions of the&nbsp; Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, at or before the time specified in the program furnished by the Contractor under GCC Sub-Clause 18.2 hereof and in the manner thereupon specified or as otherwise agreed upon by the Employer and the Contractor.</p><p>10.6&nbsp;&nbsp; The Employer shall be responsible for the continued operation of the Facilities after Completion, in accordance with GCC Sub-Clause 24.8, and shall be responsible for facilitating the Guarantee Test(s) for the Facilities, in accordance with GCC Sub-Clause 25.2.</p><p>10.7&nbsp;&nbsp; All costs and expenses involved in the performance of the obligations under this GCC Clause 10 shall be the responsibility of the Employer, save those to be incurred by the Contractor with respect to the performance of Guarantee Tests, in accordance with GCC Sub-Clause 25.2.</p><p>10.8&nbsp;&nbsp; In the event that the Employer shall be in breach of any of his obligations under this Clause, the additional cost incurred by the Contractor in consequence thereof shall be determined by the Project Manager and added to the Contract Price.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:157px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:10px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:474px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\">&nbsp;</td></tr></tbody></table><ol><li><strong>Payment</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:234px; vertical-align:top; width:151px\"><p><strong>11.&nbsp; Contract Price</strong></p></td><td style=\"height:234px; vertical-align:top; width:486px\"><p>11.1&nbsp;&nbsp; The Contract Price shall be as specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement.</p><p>11.2&nbsp;&nbsp; Unless an adjustment clause is <strong>provided for in the PCC,</strong> the Contract Price shall be a firm lump sum not subject to any alteration, except in the event of a Change in the Facilities or as otherwise provided in the Contract.</p><p>11.3&nbsp;&nbsp; Subject to GCC Sub-Clauses 9.2, 10.1 and 35 hereof, the Contractor shall be deemed to have satisfied itself as to the correctness and sufficiency of the Contract Price, which shall, except as otherwise provided for in the Contract, cover all its obligations under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>12.&nbsp; Terms of Payment</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>12.1&nbsp;&nbsp; The Contract Price shall be paid as specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement and in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, which also outlines the procedures to be followed in making application for and processing payments.</p><p>12.2&nbsp;&nbsp; No payment made by the Employer herein shall be deemed to constitute acceptance by the Employer of the Facilities or any part(s) thereof.</p><p>12.3&nbsp;&nbsp; In the event that the Employer fails to make any payment by its respective due date or within the period set forth in the Contract, the Employer shall pay to the Contractor interest on the amount of such delayed payment at the rate(s) shown in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, for the period of delay until payment has been made in full, whether before or after judgment or arbitrage award.</p><p>12.4&nbsp;&nbsp; The currency or currencies in which payments are made to the Contractor under this Contract shall be specified in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, subject to the general principle that payments will be made in the currency or currencies in which the Contract Price has been stated in the Contractor&rsquo;s Bid.</p><p>12.5&nbsp;&nbsp; <strong>As specified in the PCC</strong>, if the Contractor fails to perform its cyber security obligations under the Contract, an assessed amount, as determined by the Project Manager, may be withheld until the obligation has been performed.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>13.&nbsp; Securities</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>13.1&nbsp;&nbsp; <u>Issuance of Securities</u></p><p>The Contractor shall provide the securities specified below in favor of the Employer at the times, and in the amount, manner and form specified below.</p><p>13.2&nbsp;&nbsp; <u>Advance Payment Security</u></p><p>13.2.1 The Contractor shall, within twenty-eight (28) days of the notification of contract award, provide a security in an amount equal to the advance payment calculated in accordance with the Appendix to the Contract Agreement titled Terms and Procedures of Payment, and in the same currency or currencies.</p><p>13.2.2 The security shall be in the form provided in the Bidding documents or in another form acceptable to the Employer.&nbsp; The amount of the security shall be reduced in proportion to the value of the Facilities executed by and paid to the Contractor from time to time, and shall automatically become null and void when the full amount of the advance payment has been recovered by the Employer.&nbsp; The security shall be returned to the Contractor immediately after its expiration.</p><p>13.3&nbsp;&nbsp; <u>Performance Security</u></p><p>13.3.1 The Contractor shall, within twenty-eight (28) days of the notification of contract award, provide a security for the due performance of the Contract in the amount <strong>specified in the PCC.</strong></p><p>13.3.2 The Performance Security shall be denominated in the currency or currencies of the Contract, or in a freely convertible currency acceptable to the Employer, and shall be in the form provided in Section X, Contract Forms, corresponding to the type of bank guarantee stipulated by the Employer in the PCC, or in another form acceptable to the Employer.</p><p>13.3.3 Unless otherwise specified in the PCC, the security shall be reduced by half on the date of the Operational Acceptance. The Security shall become null and void, or shall be reduced pro rata to the Contract Price of a part of the Facilities for which a separate Time for Completion is provided, five hundred and forty (540) days after Completion of the Facilities or three hundred and sixty five (365) days after Operational Acceptance of the Facilities, whichever occurs first; provided, however, that if the Defects Liability Period has been extended on any part of the Facilities pursuant to GCC Sub-Clause 27.8 hereof, the Contractor shall issue an additional security in an amount proportionate to the Contract Price of that part.&nbsp; The security shall be returned to the Contractor immediately after its expiration, provided, however, that if the Contractor, pursuant to GCC Sub-Clause 27.10, is liable for an extended defect liability obligation, the Performance Security shall be extended for the period specified in the PCC pursuant to GCC Sub-Clause 27.10 and up to the amount specified in the PCC.</p><p>13.3.4 The Employer shall not make a claim under the Performance Security, except for amounts to which the Employer is entitled under the Contract. The Employer shall indemnify and hold the Contractor harmless against and from all damages, losses and expenses (including legal fees and expenses) resulting from a claim under the Performance Security to the extent to which the Employer was not entitled to make the claim.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>14.&nbsp; Taxes and Duties</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>14.1&nbsp;&nbsp; Except as otherwise specifically provided in the Contract, the Contractor shall bear and pay all taxes, duties, levies and charges assessed on the Contractor, its Subcontractors or their employees by all municipal, state or national government authorities in connection with the Facilities in and outside of the country where the Site is located.</p><p>14.2&nbsp;&nbsp; Notwithstanding GCC Sub-Clause 14.1 above, the Employer shall bear and promptly pay</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; all customs and import duties for the Plant specified in Price Schedule No. 1; and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; other domestic taxes such as, sales tax and value added tax (VAT) on the Plant specified in Price Schedules No. 1 and No. 2 and that is to be incorporated into the Facilities, and on the finished goods, imposed by the law of the country where the Site is located.</p><p>14.3&nbsp;&nbsp; If any tax exemptions, reductions, allowances or privileges may be available to the Contractor in the country where the Site is located, the Employer shall use its best endeavors to enable the Contractor to benefit from any such tax savings to the maximum allowable extent.</p><p>14.4&nbsp;&nbsp; For the purpose of the Contract, it is agreed that the Contract Price specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement is based on the taxes, duties, levies and charges prevailing at the date twenty-eight (28) days prior to the date of Bid submission in the country where the Site is located (hereinafter called &ldquo;Tax&rdquo; in this GCC Sub-Clause 14.4).&nbsp; If any rates of Tax are increased or decreased, a new Tax is introduced, an existing Tax is abolished, or any change in interpretation or application of any Tax occurs in the course of the performance of Contract, which was or will be assessed on the Contractor, Subcontractors or their employees in connection with performance of the Contract, an equitable adjustment of the Contract Price shall be made to fully take into account any such change by addition to the Contract Price or deduction therefrom, as the case may be, in accordance with GCC Clause 36 hereof.</p></td></tr></tbody></table><ol><li><strong>Intellectual Property</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:637px\"><tbody><tr><td style=\"vertical-align:top; width:151px\"><p><strong>15.&nbsp; License/Use of Technical Information </strong></p></td><td style=\"vertical-align:top; width:486px\"><p>15.1&nbsp;&nbsp;&nbsp; For the operation and maintenance of the Plant, the Contractor hereby grants a non-exclusive and non-transferable license (without the right to sub-license) to the Employer under the patents, utility models or other industrial property rights owned by the Contractor or by a third Party from whom the Contractor has received the right to grant licenses thereunder, and shall also grant to the Employer a non-exclusive and non-transferable right (without the right to sub-license) to use the know-how and other technical information disclosed to the Employer under the Contract. Nothing contained herein shall be construed as transferring ownership of any patent, utility model, trademark, design, copyright, know-how or other intellectual property right from the Contractor or any third Party to the Employer.</p><p>15.2&nbsp;&nbsp; The copyright in all drawings, documents and other materials containing data and information furnished to the Employer by the Contractor herein shall remain vested in the Contractor or, if they are furnished to the Employer directly or through the Contractor by any third Party, including suppliers of materials, the copyright in such materials shall remain vested in such third Party.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>16.&nbsp; Confidential Information</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>16.1&nbsp;&nbsp; The Employer and the Contractor shall keep confidential and shall not, without the written consent of the other Party hereto, divulge to any third Party any documents, data or other information furnished directly or indirectly by the other Party hereto in connection with the Contract, whether such information has been furnished prior to, during or following termination of the Contract.&nbsp; Notwithstanding the above, the Contractor may furnish to its Subcontractor(s) such documents, data and other information it receives from the Employer to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor under this GCC Clause 16.</p><p>16.2&nbsp;&nbsp; The Employer shall not use such documents, data and other information received from the Contractor for any purpose other than the operation and maintenance of the Facilities.&nbsp; Similarly, the Contractor shall not use such documents, data and other information received from the Employer for any purpose other than the design, procurement of Plant, construction or such other work and services as are required for the performance of the Contract.</p><p>16.3&nbsp;&nbsp; The obligation of a Party under GCC Sub-Clauses 16.1 and 16.2 above, however, shall not apply to that information which</p><p>(a)&nbsp;&nbsp; now or hereafter enters the public domain through no fault of that Party</p><p>(b)&nbsp;&nbsp; can be proven to have been possessed by that Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto</p><p>(c)&nbsp;&nbsp; otherwise lawfully becomes available to that Party from a third Party that has no obligation of confidentiality</p><p>(d) &nbsp;is being provided to the Bank.</p><p>16.4&nbsp;&nbsp; The above provisions of this GCC Clause 16 shall not in any way modify any undertaking of confidentiality given by either of the Parties hereto prior to the date of the Contract in respect of the Facilities or any part thereof.</p><p>16.5&nbsp;&nbsp; The provisions of this GCC Clause 16 shall survive termination, for whatever reason, of the Contract.</p></td></tr></tbody></table><ol><li><strong>Execution of the Facilities</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:636px\"><tbody><tr><td style=\"vertical-align:top; width:157px\"><p><strong>17.&nbsp; Representatives</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>17.1&nbsp;&nbsp; Project Manager</p><p>If the Project Manager is not named in the Contract, then within fourteen (14) days of the Effective Date, the Employer shall appoint and notify the Contractor in writing of the name of the Project Manager.&nbsp; The Employer may from time to time appoint some other person as the Project Manager in place of the person previously so appointed, and shall give a notice of the name of such other person to the Contractor without delay.&nbsp; No such appointment shall be made at such a time or in such a manner as to impede the progress of work on the Facilities.&nbsp; Such appointment shall only take effect upon receipt of such notice by the Contractor.&nbsp; The Project Manager shall represent and act for the Employer at all times during the performance of the Contract.&nbsp; All notices, instructions, orders, certificates, approvals and all other communications under the Contract shall be given by the Project Manager, except as herein otherwise provided.</p><p>All notices, instructions, information and other communications given by the Contractor to the Employer under the Contract shall be given to the Project Manager, except as herein otherwise provided.</p><p>17.2&nbsp;&nbsp; Contractor&rsquo;s Representative &amp; Construction Manager</p><p>17.2.1 If the Contractor&rsquo;s Representative is not named in the Contract, then within fourteen (14) days of the Effective Date, the Contractor shall appoint the Contractor&rsquo;s Representative and shall request the Employer in writing to approve the person so appointed.&nbsp; If the Employer makes no objection to the appointment within fourteen (14) days, the Contractor&rsquo;s Representative shall be deemed to have been approved.&nbsp; If the Employer objects to the appointment within fourteen (14) days giving the reason therefor, then the Contractor shall appoint a replacement within fourteen (14) days of such objection, and the foregoing provisions of this GCC Sub-Clause 17.2.1 shall apply thereto.</p><p>17.2.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor&rsquo;s Representative shall represent and act for the Contractor at all times during the performance of the Contract and shall give to the Project Manager all the Contractor&rsquo;s notices, instructions, information and all other communications under the Contract.</p><p>All notices, instructions, information and all other communications given by the Employer or the Project Manager to the Contractor under the Contract shall be given to the Contractor&rsquo;s Representative or, in its absence, its deputy, except as herein otherwise provided.</p><p>The Contractor shall not revoke the appointment of the Contractor&rsquo;s Representative without the Employer&rsquo;s prior written consent, which shall not be unreasonably withheld.&nbsp; If the Employer consents thereto, the Contractor shall appoint some other person as the Contractor&rsquo;s Representative, pursuant to the procedure set out in GCC Sub-Clause 17.2.1.</p><p>17.2.3&nbsp;&nbsp;&nbsp;&nbsp; The Contractor&rsquo;s Representative may, subject to the approval of the Employer which shall not be unreasonably withheld, at any time delegate to any person any of the powers, functions and authorities vested in him or her.&nbsp; Any such delegation may be revoked at any time.&nbsp; Any such delegation or revocation shall be subject to a prior notice signed by the Contractor&rsquo;s Representative, and shall specify the powers, functions and authorities thereby delegated or revoked.&nbsp; No such delegation or revocation shall take effect unless and until a copy thereof has been delivered to the Employer and the Project Manager.</p><p>Any act or exercise by any person of powers, functions and authorities so delegated to him or her in accordance with this GCC Sub-Clause 17.2.3 shall be deemed to be an act or exercise by the Contractor&rsquo;s Representative.</p><p>17.2.4&nbsp;&nbsp;&nbsp;&nbsp; From the commencement of installation of the Facilities at the Site until Completion, the Contractor&rsquo;s Representative shall appoint a suitable person as the Construction Manager.&nbsp; The Construction Manager shall supervise all work done at the Site by the Contractor and shall be present at the Site throughout normal working hours except when on leave, sick or absent for reasons connected with the proper performance of the Contract.&nbsp; Whenever the Construction Manager is absent from the Site, a suitable person shall be appointed to act as the Construction Manager&rsquo;s deputy.</p><p>17.2.5&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager may require the Contractor to remove (or cause to be removed) the Contractor&rsquo;s Representative or any other person employed by the Contractor in the execution of the Contract, who:</p><ol><li>persists in any misconduct or lack of care;</li><li>carries out duties incompetently or negligently;</li><li>fails to comply with any provision of the Contract;</li><li>persists in any conduct which is prejudicial to safety, health, or the protection of the environment;</li><li>based on reasonable evidence, is determined to have engaged in Fraud and Corruption during the execution of the Contract;</li><li>has been recruited from the Employer&rsquo;s Personnel in breach of GCC Sub-Clause 22.2.2;</li><li>undertakes behaviour which breaches the Code of Conduct (ES), as applicable;</li></ol><p>If appropriate, the Contractor shall then promptly appoint (or cause to be appointed) a suitable replacement with equivalent skills and experience.</p><p>Notwithstanding any requirement from the Project Manager to remove or cause to remove any person, the Contractor shall take immediate action as appropriate in response to any violation of (a) through (g) above. Such immediate action shall include removing (or causing to be removed) from the Site or other places where the Contract is being executed, any Contractor&rsquo;s Personnel who engages in (a), (b), (c), (d), (e) or (g) above or has been recruited as stated in (f) above..</p><p>17.2.6&nbsp;&nbsp;&nbsp;&nbsp; If any representative or person employed by the Contractor is removed in accordance with GCC Sub-Clause 17.2.5, the Contractor shall, where required, promptly appoint a suitable replacement with equivalent skills and experience.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>18.&nbsp; Work Program</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>18.1&nbsp;&nbsp; <u>Contractor&rsquo;s Organization</u></p><p>The Contractor shall supply to the Employer and the Project Manager a chart showing the proposed organization to be established by the Contractor for carrying out work on the Facilities within twenty-one (21) days of the Effective Date.&nbsp; The chart shall include the identities of the key personnel and the curricula vitae of such key personnel to be employed shall be supplied together with the chart.&nbsp; The Contractor shall promptly inform the Employer and the Project Manager in writing of any revision or alteration of such an organization chart.</p><p>18.2&nbsp;&nbsp; <u>Program of Performance</u></p><p>Within twenty-eight (28) days after the Effective Date, the Contractor shall submit to the Project Manager a detailed program of performance of the Contract, made in a form acceptable to the Project Manager and showing the sequence in which it proposes to design, manufacture, transport, assemble, install and precommission the Facilities, as well as the date by which the Contractor reasonably requires that the Employer shall have fulfilled its obligations under the Contract so as to enable the Contractor to execute the Contract in accordance with the program and to achieve Completion, Commissioning and Acceptance of the Facilities in accordance with the Contract.&nbsp; The program so submitted by the Contractor shall accord with the Time Schedule included in the Appendix to the Contract Agreement titled Time Schedule, and any other dates and periods specified in the Contract.&nbsp; The Contractor shall update and revise the program as and when appropriate or when required by the Project Manager, but without modification in the Times for Completion specified in the PCC pursuant to Sub-Clause 8.2 and any extension granted in accordance with GCC Clause 40, and shall submit all such revisions to the Project Manager.</p><p>18.3&nbsp;&nbsp; <u>Progress Report</u></p><p>The Contractor shall monitor progress of all the activities specified in the program referred to in GCC Sub-Clause 18.2 above, and supply a progress report to the Project Manager every month.</p><p>The progress report shall be in a form acceptable to the Project Manager and shall indicate: (a) percentage completion achieved compared with the planned percentage completion for each activity; and (b) where any activity is behind the program, giving comments and likely consequences and stating the corrective action being taken.</p><p>Unless otherwise stated in the Employer&rsquo;s Requirements, each progress report shall include the Environmental and Social (ES) metrics set out in Appendix C.</p><p><strong>If stated in the PCC</strong>, progress report shall include status of compliance to cyber security risks management, and any foreseeable cyber security risk and mitigation.</p><p>In addition to the progress reports, the Contractor shall inform the Project Manager immediately of any allegation, incident or accident in the Site,&nbsp; which has or is likely to have a significant adverse effect on the environment, the affected communities, the public, Employer&rsquo;s Personnel or Contractor&rsquo;s Personnel. This includes, but is not limited to, any incident or accident causing fatality or serious injury; significant adverse effects or damage to private property; any cyber security incidents <strong>as specified in the PCC</strong>; or any allegation of SEA and/or SH. In case of SEA and/or SH, while maintaining confidentiality as appropriate, the type of allegation (sexual exploitation, sexual abuse or sexual harassment), gender and age of the person who experienced the alleged incident should be included in the information.</p><p>The Contractor, upon becoming aware of the allegation, incident or accident, shall also immediately inform the Project Manager of any such incident or accident on the Subcontractors&rsquo; or suppliers&rsquo; premises relating to the Facilities &nbsp;which has or is likely to have a significant adverse effect on the environment, the affected communities, the public, Employer&rsquo;s Personnel, or Contractor&rsquo;s, its Subcontractors&rsquo; and suppliers&rsquo; personnel. The notification shall provide sufficient detail regarding such incidents or accidents. The Contractor shall provide full details of such incidents or accidents to the Project Manager within the timeframe agreed with the Project Manager.</p><p>The Contractor shall require its Subcontractors and suppliers to immediately notify the Contractor of any incidents or accidents referred to in this Subclause.</p><p>18.4&nbsp;&nbsp; <u>Progress of Performance</u></p><p>If at any time the Contractor&rsquo;s actual progress falls behind the program referred to in GCC Sub-Clause 18.2, or it becomes apparent that it will so fall behind, the Contractor shall, at the request of the Employer or the Project Manager, prepare and submit to the Project Manager a revised program, taking into account the prevailing circumstances, and shall notify the Project Manager of the steps being taken to expedite progress so as to attain Completion of the Facilities within the Time for Completion under GCC Sub-Clause 8.2, any extension thereof entitled under GCC Sub-Clause 40.1, or any extended period as may otherwise be agreed upon between the Employer and the Contractor.</p><p>18.5&nbsp;&nbsp; <u>Procedures</u></p><p>The Contract shall be executed in accordance with the Contract Documents including the procedures given in the Forms and Procedures of the Employer&rsquo;s Requirements.</p><p>The Contractor may execute the Contract in accordance with its own standard project execution plans and procedures to the extent that they do not conflict with the provisions contained in the Contract.<em> </em></p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>19.&nbsp; Subcontracting</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>19.1&nbsp;&nbsp; The Appendix to the Contract Agreement titled List of Major Items of Plant and Installation Services and List of Approved Subcontractors, specifies major items of supply or services and a list of approved Subcontractors against each item, including manufacturers.&nbsp; Insofar as no Subcontractors are listed against any such item, the Contractor shall prepare a list of Subcontractors for such item for inclusion in such list.&nbsp; The Contractor may from time to time propose any addition to or deletion from any such list.&nbsp; The Contractor shall submit any such list or any modification thereto to the Employer for its approval in sufficient time so as not to impede the progress of work on the Facilities. Submission by the Contractor, for addition of any Subcontractor not named in the Contract, shall also include the Subcontractor&rsquo;s declaration in accordance with Appendix D- Sexual exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Performance Declaration. Approval by the Employer for any of the Subcontractors shall not relieve the Contractor from any of its obligations, duties or responsibilities under the Contract.</p><p>19.2&nbsp;&nbsp; The Contractor shall select and employ its Subcontractors for such major items from those listed in the lists referred to in GCC Sub-Clause 19.1.</p><p>19.3&nbsp;&nbsp; For items or parts of the Facilities not specified in the Appendix to the Contract Agreement titled List of Major Items of Plant and Installation Services and List of Approved Subcontractors, the Contractor may employ such Subcontractors as it may select, at its discretion.</p><p>19.4&nbsp;&nbsp; Each sub-contract shall include provisions which would entitle the Employer to require the sub-contract to be assigned to the Employer under GCC 19.5 (if and when applicable), or in event of termination by the Employer under GCC 42.2.</p><p>19.5&nbsp;&nbsp; If a Subcontractor&#39;s obligations extend beyond the expiry date of the relevant Defects Liability Period and the<strong> </strong>Project Manager, prior to that date, instructs the Contractor to assign the benefits of such obligations to the Employer, then the Contractor shall do so.</p><p>19.6 The Contractor shall ensure that its Subcontractors execute the Facilities in accordance with the Contract, including complying with the relevant ES requirements and the obligations set out in GCC Sub-Clause 22.4.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>20.&nbsp; Design and Engineering</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>20.1&nbsp;&nbsp; <u>Specifications and Drawings</u></p><p>20.1.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall execute the basic and detailed design and the engineering work in compliance with the provisions of the Contract, or where not so specified, in accordance with good engineering practice.</p><p>The Contractor shall be responsible for any discrepancies, errors or omissions in the specifications, drawings and other technical documents that it has prepared, whether such specifications, drawings and other documents have been approved by the Project Manager or not, provided that such discrepancies, errors or omissions are not because of inaccurate information furnished in writing to the Contractor by or on behalf of the Employer.</p><p>20.1.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designated by or on behalf of the Employer, by giving a notice of such disclaimer to the Project Manager.</p><p>20.2&nbsp;&nbsp; <u>Codes and Standards</u></p><p>Wherever references are made in the Contract to codes and standards in accordance with which the Contract shall be executed, the edition or the revised version of such codes and standards current at the date twenty-eight (28) days prior to date of Bid submission shall apply unless otherwise specified.&nbsp; During Contract execution, any changes in such codes and standards shall be applied subject to approval by the Employer and shall be treated in accordance with GCC Clause 39.</p><p>20.3&nbsp;&nbsp; <u>Approval/Review of Technical Documents by Project Manager</u></p><p>20.3.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall prepare or cause its Subcontractors to prepare, and furnish to the Project Manager the documents listed in the&nbsp; Appendix to the Contract Agreement titled List of Documents for Approval or Review, for its approval or review as specified and in accordance with the requirements of GCC Sub-Clause 18.2 (Program of Performance).</p><p>Any part of the Facilities covered by or related to the documents to be approved by the Project Manager shall be executed only after the Project Manager&rsquo;s approval thereof.</p><p>GCC Sub-Clauses 20.3.2 through 20.3.7 shall apply to those documents requiring the Project Manager&rsquo;s approval, but not to those furnished to the Project Manager for its review only.</p><p>20.3.2&nbsp;&nbsp;&nbsp;&nbsp; Within fourteen (14) days after receipt by the Project Manager of any document requiring the Project Manager&rsquo;s approval in accordance with GCC Sub-Clause 20.3.1, the Project Manager shall either return one copy thereof to the Contractor with its approval endorsed thereon or shall notify the Contractor in writing of its disapproval thereof and the reasons therefor and the modifications that the Project Manager proposes.</p><p>If the Project Manager fails to take such action within the said fourteen (14) days, then the said document shall be deemed to have been approved by the Project Manager.</p><p>20.3.3&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager shall not disapprove any document, except on the grounds that the document does not comply with the Contract or that it is contrary to good engineering practice.</p><p>20.3.4&nbsp;&nbsp;&nbsp;&nbsp; If the Project Manager disapproves the document, the Contractor shall modify the document and resubmit it for the Project Manager&rsquo;s approval in accordance with GCC Sub-Clause 20.3.2. If the Project Manager approves the document subject to modification(s), the Contractor shall make the required modification(s), whereupon the document shall be deemed to have been approved.</p><p>20.3.5&nbsp;&nbsp;&nbsp;&nbsp; If any dispute or difference occurs between the Employer and the Contractor in connection with or arising out of the disapproval by the Project Manager of any document and/or any modification(s) thereto that cannot be settled between the Parties within a reasonable period, then such dispute or difference may be referred to a Dispute Board for determination in accordance with GCC Sub-Clause 46.1 hereof.&nbsp; If such dispute or difference is referred to a Dispute Board, the Project Manager shall give instructions as to whether and if so, how, performance of the Contract is to proceed.&nbsp; The Contractor shall proceed with the Contract in accordance with the Project Manager&rsquo;s instructions, provided that if the Dispute Board upholds the Contractor&rsquo;s view on the dispute and if the Employer has not given notice under GCC Sub-Clause 46.3 hereof, then the Contractor shall be reimbursed by the Employer for any additional costs incurred by reason of such instructions and shall be relieved of such responsibility or liability in connection with the dispute and the execution of the instructions as the Dispute Board shall decide, and the Time for Completion shall be extended accordingly.</p><p>20.3.6&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager&rsquo;s approval, with or without modification of the document furnished by the Contractor, shall not relieve the Contractor of any responsibility or liability imposed upon it by any provisions of the Contract except to the extent that any subsequent failure results from modifications required by the Project Manager.</p><p>20.3.7&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall not depart from any approved document unless the Contractor has first submitted to the Project Manager<em> </em>an amended document and obtained the Project Manager&rsquo;s approval thereof, pursuant to the provisions of this GCC Sub-Clause 20.3.</p><p>If the Project Manager requests any change in any already approved document and/or in any document based thereon, the provisions of GCC Clause 39 shall apply to such request.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>21.&nbsp; Procurement</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>21.1&nbsp;&nbsp; <u>Plant </u></p><p>Subject to GCC Sub-Clause 14.2, the Contractor shall procure and transport all Plant in an expeditious and orderly manner to the Site.</p><p>21.2&nbsp;&nbsp; <u>Employer-Supplied Plant</u></p><p>If the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, provides that the Employer shall furnish any specific items to the Contractor, the following provisions shall apply:</p><p>21.2.1&nbsp;&nbsp;&nbsp;&nbsp; The Employer shall, at its own risk and expense, transport each item to the place on or near the Site as agreed upon by the Parties and make such item available to the Contractor at the time specified in the program furnished by the Contractor, pursuant to GCC Sub-Clause 18.2, unless otherwise mutually agreed.</p><p>21.2.2&nbsp;&nbsp;&nbsp;&nbsp; Upon receipt of such item, the Contractor shall inspect the same visually and notify the Project Manager of any detected shortage, defect or default.&nbsp; The Employer shall immediately remedy any shortage, defect or default, or the Contractor shall, if practicable and possible, at the request of the Employer, remedy such shortage, defect or default at the Employer&rsquo;s cost and expense.&nbsp; After inspection, such item shall fall under the care, custody and control of the Contractor.&nbsp; The provision of this GCC Sub-Clause 21.2.2 shall apply to any item supplied to remedy any such shortage or default or to substitute for any defective item, or shall apply to defective items that have been repaired.</p><p>21.2.3&nbsp;&nbsp;&nbsp;&nbsp; The foregoing responsibilities of the Contractor and its obligations of care, custody and control shall not relieve the Employer of liability for any undetected shortage, defect or default, nor place the Contractor under any liability for any such shortage, defect or default whether under GCC Clause 27 or under any other provision of Contract.</p><p>21.3&nbsp;&nbsp; <u>Transportation</u></p><p>21.3.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall at its own risk and expense transport all the materials and the Contractor&rsquo;s Equipment to the Site by the mode of transport that the Contractor judges most suitable under all the circumstances.</p><p>21.3.2&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise provided in the Contract, the Contractor shall be entitled to select any safe mode of transport operated by any person to carry the materials and the Contractor&rsquo;s Equipment.</p><p>21.3.3&nbsp;&nbsp;&nbsp;&nbsp; Upon dispatch of each shipment of materials and the Contractor&rsquo;s Equipment, the Contractor shall notify the Employer by telex, cable, facsimile or electronic means, of the description of the materials and of the Contractor&rsquo;s Equipment, the point and means of dispatch, and the estimated time and point of arrival in the country where the Site is located, if applicable, and at the Site.&nbsp; The Contractor shall furnish the Employer with relevant shipping documents to be agreed upon between the Parties.</p><p>21.3.4&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall be responsible for obtaining, if necessary, approvals from the authorities for transportation of the materials and the Contractor&rsquo;s Equipment to the Site.&nbsp; The Employer shall use its best endeavors in a timely and expeditious manner to assist the Contractor in obtaining such approvals, if requested by the Contractor.&nbsp; The Contractor shall indemnify and hold harmless the Employer from and against any claim for damage to roads, bridges or any other traffic facilities that may be caused by the transport of the materials and the Contractor&rsquo;s Equipment to the Site.</p><p>21.4&nbsp;&nbsp; <u>Customs Clearance</u></p><p>The Contractor shall, at its own expense, handle all imported materials and Contractor&rsquo;s Equipment at the point(s) of import and shall handle any formalities for customs clearance, subject to the Employer&rsquo;s obligations under GCC Sub-Clause 14.2, provided that if applicable laws or regulations require any application or act to be made by or in the name of the Employer, the Employer shall take all necessary steps to comply with such laws or regulations.&nbsp; In the event of delays in customs clearance that are not the fault of the Contractor, the Contractor shall be entitled to an extension in the Time for Completion, pursuant to GCC Clause 40.</p></td></tr><tr><td style=\"height:168px; vertical-align:top; width:157px\"><p><strong>22.&nbsp; Installation</strong></p></td><td style=\"height:168px; vertical-align:top; width:479px\"><p>22.1&nbsp;&nbsp; Setting Out/Supervision</p><p>22.1.1&nbsp;&nbsp;&nbsp;&nbsp; Bench Mark:&nbsp; The Contractor shall be responsible for the true and proper setting-out of the Facilities in relation to bench marks, reference marks and lines provided to it in writing by or on behalf of the Employer.</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; If, at any time during the progress of installation of the Facilities, any error shall appear in the position, level or alignment of the Facilities, the Contractor shall forthwith notify the Project Manager of such error and, at its own expense, immediately rectify such error to the reasonable satisfaction of the Project Manager.&nbsp; If such error is based on incorrect data provided in writing by or on behalf of the Employer, the expense of rectifying the same shall be borne by the Employer.</p><p>22.1.2&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Supervision:&nbsp; The Contractor shall give or provide all necessary superintendence during the installation of the Facilities, and the Construction Manager or its deputy shall be constantly on the Site to provide full-time superintendence of the installation.&nbsp; The Contractor shall provide and employ only technical personnel who are skilled and experienced in their respective callings and supervisory staff who are competent to adequately supervise the work at hand.</p><p>22.2&nbsp;&nbsp; Labor:</p><p>22.2.1 Engagement of Staff and Labor</p><p>Except as otherwise stated in the &nbsp;Employer&rsquo;s Requirements, the Contractor shall make arrangements for the engagement of all staff and labor, local or otherwise, and for their payment, housing, feeding and transport.</p><p>The Contractor shall provide and employ on the Site in the installation of the Facilities such skilled, semi-skilled and unskilled labor as is necessary for the proper and timely execution of the Contract.&nbsp; The Contractor is encouraged to use local labor that has the necessary skills.</p><p>The Contractor shall be responsible for obtaining all necessary permit(s) and/or visa(s) from the appropriate authorities for the entry of all labor and personnel to be employed on the Site into the country where the Site is located. The Employer will, if requested by the Contractor, use his best endeavors in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national or government permission required for bringing in the Contractor&rsquo;s &nbsp;&nbsp;Personnel.</p><p>The Contractor shall at its own expense provide the means of repatriation to all of its Contractor&rsquo;s Personnel employed for the excution of the Contract at the Site or other places where the Installation Services are carried out to the place where they were recruited or to their domicile.&nbsp; It shall also provide suitable temporary maintenance of all such persons from the cessation of their employment on the Contract to the date programmed for their departure.&nbsp; In the event that the Contractor defaults in providing such means of transportation and temporary maintenance, the Employer may provide the same to such personnel and recover the cost of doing so from the Contractor.</p><p>The Contractor shall provide Contractor&rsquo;s Personnel employed for the execution of the Contract at the Site or other places where the Installation Services are carried out, relevant information and documentation that are clear and understandable regarding their terms and conditions of employment. The information and documentation shall set out their rights under relevant labor laws applicable to the Contractor&rsquo;s Personnel (which will include any applicable collective agreements), including their rights related to hours of work, wages, overtime, compensation and benefits, as well as those arising from any requirements in the &nbsp;Employer&rsquo;s Requirements. The Contractor&rsquo;s Personnel shall be informed when any material changes to their terms or conditions of employment occur.</p><p>22.2.2 Persons in the Service of Employer</p><p>The Contractor shall not recruit, or attempt to recruit, staff and labor from amongst the Employer&rsquo;s Personnel.</p><p>22.2.3 Labor Laws</p><p>The Contractor shall comply with all the relevant labor laws applicable to the Contractor&rsquo;s Personnel, including laws relating to their employment, health, safety, welfare, immigration and emigration, and shall allow them all their legal rights.</p><p>The Contractor shall at all times during the progress of the Contract use its best endeavors to prevent any unlawful, riotous or disorderly conduct or behavior by or amongst its employees and the labor of its Subcontractors.</p><p>The Contractor shall, in all dealings with its labor and the labor of its Subcontractors currently employed on or connected with the Contract, pay due regard to all recognized festivals, official holidays, religious or other customs and all local laws and regulations pertaining to the employment of labor.</p><p>22.2.4 Rates of Wages and Conditions of Labor</p><p>The Contractor shall pay rates of wages, and observe conditions of labor, which are not lower than those established for the trade or industry where the work is carried out. If no established rates or conditions are applicable, the Contractor shall pay rates of wages and observe conditions which are not lower than the general level of wages and conditions observed locally by employers whose trade or industry is similar to that of the Contractor.</p><p>The Contractor shall inform the Contractor&rsquo;s Personnel about:</p><ol><li>any deduction to their payment and the conditions of such deductions in accordance with the applicable laws or as stated in the Employer&rsquo;s Requirements; and</li><li>their liability to pay personal income taxes in the Country in respect of such of their salaries, wages, allowances and any benefits as are subject to tax under the laws of the Country for the time being in force.</li></ol><p>The Contractor shall perform such duties in regard to such deductions thereof as may be imposed on him by such laws.</p><p>Where required by applicable Laws or as stated in the Employer&rsquo;s Requirements, the Contractor and its Subcontarctors shall provide their&nbsp; personnel written notice of termination of employment and details of severance payments in a timely manner. The Contractor and its Subcontractors shall have paid their personnel (either directly or where appropriate for their benefit) all due wages and entitlements including, as applicable, social security benefits and pension contributions, on or before the end of their engagement/ employment.</p><p>22.2.5 Working Hours</p><p>&nbsp;&nbsp;&nbsp; No work shall be carried out on the Site on locally recognized days of rest, or outside the normal working hours stated in the PCC, unless:</p><p>(a) &nbsp;&nbsp;&nbsp; otherwise stated in the Contract,</p><p>(b) &nbsp;&nbsp;&nbsp; the Project Manager gives consent, or</p><p>(c) &nbsp;&nbsp;&nbsp; the work is unavoidable, or necessary for the protection of life or property or for the safety of the Facilities, in which case the Contractor shall immediately advise the Project Manager.</p><p>If and when the Contractor considers it necessary to carry out work at night or on public holidays so as to meet the Time for Completion and requests the Project Manager&rsquo;s consent thereto, the Project Manager shall not unreasonably withhold such consent.</p><p>This Sub-Clause shall not apply to any work which is customarily carried out by rotary or double-shifts.</p><p>22.2.6 Facilities for Staff and Labor</p><p>Except as otherwise stated in the Employer&rsquo;s Requirements, the Contractor shall provide and maintain all necessary accommodation and welfare facilities for the Contractor&rsquo;s Personnel employed for the execution of the Contract at the Site or other places where the Installation Services are carried out. The Contractor shall also provide facilities for the Employer&rsquo;s &nbsp;Personnel as stated in the Employer&rsquo;s Requirements.</p><p>If stated in the Employer&rsquo;s Requirements, the Contractor shall give access to or provide services that accommodate the physical, social and cultural needs of the Contractor&rsquo;s Personnel. The Contractor shall also provide similar facilities for the Employer&rsquo;s Personnel as stated in the Employer&rsquo;s Requirements.</p><p>The Contractor shall not permit any of the Contractor&rsquo;s Personnel to maintain any temporary or permanent living quarters within the structures forming part of the Facilities.</p><p>22.2.7 Health and Safety</p><p>The Contractor shall at all times take all reasonable precautions to maintain the health and safety of the&nbsp; Contractor&rsquo;s Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located).</p><p>Subject to GCC Sub-Clause 9.9, the Contractor shall submit to the Project Manager for its approval a health and safety manual which sets out all the health and safety requirements under the Contract.</p><p>The health and safety manual shall be in addition to any other similar document required under applicable health and safety regulations and Laws.</p><p>The Contractor shall:</p><ol><li>comply with all applicable health and safety regulations and laws;</li><li>comply with all applicable health and safety obligations specified in the Contract;</li><li>develop and implement procedures to establish and maintain a safe working environment without risk to health at all workplaces, machinery, equipment and processes under the control of the Contractor, including control measures for chemical, physical and biological substances and agents;</li><li>provide health and safety training of the Contractor&rsquo;s Personnel as appropriate and maintain training records;</li><li>actively engage the Contractor&rsquo;s Personnel in promoting understanding, and methods for, implementation of health and safety requirements, as well as in providing information to such personnel, and provision of personal protective equipment without expense to the personnel;</li><li>put in place workplace processes for the Contractor&rsquo;s &nbsp;Personnel to report work situations that they believe are not safe or healthy, and to remove themselves from a work situation which they have reasonable justification to believe presents an imminent and serious danger to their life or health; Contractor&rsquo;s Personnel who remove themselves from such work situations shall not be required to return to work until necessary remedial action to correct the situation has been taken. Such personnel shall not be retaliated against or otherwise subject to reprisal or negative action for such reporting or removal;</li><li>in collaboration with local health authorities, ensure that medical staff, first aid facilities, sick bay and ambulance service are available at all times at the Site and at any accommodation for Contractor&rsquo;s and Employer&rsquo;s Personnel;</li><li>appoint an accident prevention officer at the Site, responsible for maintaining safety and protection against accidents. This person shall be qualified for this responsibility and shall have the authority to issue instructions and take protective measures to prevent accidents. Throughout the performance of the Contract, the Contractor shall provide whatever is required by this person to exercise this responsibility and authority;</li><li>put in place measures to avoid or minimize the potential for community exposure to water-borne, water-based, water-related, and vector-borne diseases;</li><li>put in place measures to be implemented to avoid or minimize the spread of communicable diseases (including transfer of Sexually Transmitted Diseases or Infections (STDs), such as HIV virus) and non-communicable diseases associated with the Installation Services, taking into consideration differentiated exposure to and higher sensitivity of vulnerable groups. This includes taking measures to avoid or minimize the transmission of communicable diseases that may be associated with the influx of temporary or permanent Contract-related labor;</li><li>have in place procedures for prevention, preparedness and response activities to be implemented in the case of an emergency event (i.e. an unanticipated incident, arising from both natural and man-made hazards, typically in the form of fire, explosions, leaks or spills, which may occur for a variety of different reasons including failure to implement operating procedures that are designed to prevent their occurrence, extreme weather or lack of early warning);</li><li>collaborate, as applicable,&nbsp; with the Employer&rsquo;s Personnel, any other contractors employed by the Employer, and/or personnel of any legally constituted public authorities and private utility companies that are employed in carrying out, on or near the site, of any work not included in the Contract, in applying the health and safety requirements. This is without prejudice to the responsibility of the relevant entities&nbsp; for the health and safety of their&nbsp; own&nbsp; personnel; and &nbsp;</li><li>put in place a system for regular review of health and safety performance and the working environment.</li></ol><p>22.2.8 Funeral Arrangements</p><p>In the event of the death of any of the Contractor&rsquo;s Personnel or accompanying members of their families, the Contractor shall be responsible for making the appropriate arrangements for their return or burial, unless otherwise specified in the PCC.</p><p>22.2.9 Records of Contractor&rsquo;s Personnel</p><p>The Contractor shall keep accurate records of the Contractor&rsquo;s Personnel, including the number of each class of Contractor&rsquo;s personnel on the Site and the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis in a form approved by the Project Manager and shall be available for inspection by the Project Manager until the Contractor has completed all work.</p><p>22.2.10 Supply of Foodstuffs</p><p>The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Employer&rsquo;s Requirements at reasonable prices for the Contractor&rsquo;s personnel for the purposes of or in connection with the Contract.</p><p>22.2.11 Supply of Water</p><p>The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor&rsquo;s personnel.</p><p>22.2.12 Measures against Insect and Pest Nuisance</p><p>The Contractor shall at all times take the necessary precautions to protect the Contractor&rsquo;s Personnel employed on the Site from insect and pest nuisance, and to reduce their danger to health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.</p><p>22.2.13 Alcoholic Liquor or Drugs</p><p>The Contractor shall not, otherwise than in accordance with the laws of the Country, import, sell, give barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift barter or disposal by Contractor&#39;s Personnel.</p><p>22.2.14 Arms and Ammunition</p><p>The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor&#39;s Personnel to do so.</p><p>22.2.15 Workers&rsquo; Organizations</p><p>In countries where the relevant labor laws recognize workers&rsquo; rights to form and to join workers&rsquo; organizations of their choosing and to bargain collectively without interference, the Contractor shall comply with such laws. In such circumstances, the role of legally established workers&rsquo; organizations and legitimate workers&rsquo; representatives will be respected, and they will be provided with information needed for meaningful negotiation in a timely manner. Where the relevant labor laws substantially restrict workers&rsquo; organizations, the Contractor shall enable alternative means for the Contractor&rsquo;s Personnel to express their grievances and protect their rights regarding working conditions and terms of employment. The Contractor shall not seek to influence or control these alternative means. The Contractor shall not discriminate or retaliate against the Contractor&rsquo;s Personnel who participate, or seek to participate, in such organizations and collective bargaining or alternative mechanisms. Workers&rsquo; organizations are expected to fairly represent the workers in the workforce.</p><p>22.2.16&nbsp; Non-Discrimination and Equal Opportunity</p><p>The Contractor shall not make decisions relating to the employment or treatment of Contractor&rsquo;s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor&rsquo;s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices.</p><p>Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure non-discrimination and equal opportunity, including for specific groups such as women, people with disabilities, migrant workers and children (of working age in accordance with GCC Sub-Clause 9.13).</p><p>22.2.17 &nbsp;Contractor&rsquo;s Personnel Grievance Mechanism</p><p>The Contractor shall have a grievance mechanism for the Contractor&rsquo;s Personnel, and where relevant the workers&rsquo; organizations stated in subclause 22.2.15, to raise workplace concerns. The grievance mechanism shall be proportionate to the nature, scale, risks and impacts of the Contract. The mechanism shall address concerns promptly, using an understandable and transparent process that provides timely feedback to those concerned in a language they understand, without any retribution, and shall operate in an independent and objective manner.</p><p>The Contractor&rsquo;s Personnel shall be informed of the grievance mechanism at the time of engagement for the Contract, and the measures put in place to protect them against any reprisal for its use. Measures will be put in place to make the grievance mechanism easily accessible to all Contractor&rsquo;s Personnel.</p><p>The grievance mechanism shall not impede access to other judicial or administrative remedies that might be available, or substitute for grievance mechanisms provided through collective agreements.</p><p>The grievance mechanism may utilize existing grievance mechanisms, providing that they are properly designed and implemented, address concerns promptly, and are readily accessible to such project workers. Existing grievance mechanisms may be supplemented as needed with Contract-specific arrangements.</p><p>22.3&nbsp;&nbsp; Contractor&rsquo;s Equipment</p><p>22.3.1 All Contractor&rsquo;s Equipment brought by the Contractor onto the Site shall be deemed to be intended to be used exclusively for the execution of the Contract.&nbsp; The Contractor shall not remove the same from the Site without the Project Manager&rsquo;s consent that such Contractor&rsquo;s Equipment is no longer required for the execution of the Contract.</p><p>22.3.2 Unless otherwise specified in the Contract, upon completion of the Facilities, the Contractor shall remove from the Site all Equipment brought by the Contractor onto the Site and any surplus materials remaining thereon.</p><p>22.3.3 The Employer will, if requested, use its best endeavors to assist the Contractor in obtaining any local, state or national government permission required by the Contractor for the export of the Contractor&rsquo;s Equipment imported by the Contractor for use in the execution of the Contract that is no longer required for the execution of the Contract.</p><p>22.4&nbsp;&nbsp; Site Regulations</p><p>The Employer and the Contractor shall establish Site regulations setting out the rules to be observed in the execution of the Contract at the Site and shall comply therewith.&nbsp; The Contractor shall prepare and submit to the Project Manager with a copy to the Employer, proposed Site regulations for the Project Manager&rsquo;s approval, which approval shall not be unreasonably withheld.</p><p>Such Site regulations shall include, but shall not be limited to, Code of Conduct for environmental and social aspectssubmitted as part of the Bid and agreed to by the Employer, , security arrangements in accordance with GCC Sub-Clause 22.8, safety of the Facilities, gate control, sanitation, medical care, and fire prevention.</p><p>The Contractor shall take all necessary measures to ensure that each Contractor&rsquo;s Personnel, employed for the execution of the Contract at the Site or other places where the Installation Services are carried out, is made aware of the Code of Conduct including specific behaviors that are prohibited, and understands the consequences of engaging in such prohibited behaviors.&nbsp;</p><p>These measures include providing instructions and documentation that can be understood by the Contractor&rsquo;s Personnel and seeking to obtain that person&rsquo;s signature acknowledging receipt of such instructions and/or documentation, as appropriate.</p><p>The Contractor shall also ensure that the Code of Conduct is visibly displayed in multiple locations on the Site and any other place where the Installation Services &nbsp;will be carried out, as well as in areas outside the Site accessible to the local community and project affected people. The posted Code of Conduct shall be provided in languages comprehensible to Contractor&rsquo;s Personnel, Employer&rsquo;s Personnel and the local community.</p><p>The Contractor&rsquo;s Management Strategy and Implementation Plans shall include appropriate processes for the Contractor to verify compliance with these obligations.</p><p>22.5&nbsp;&nbsp; Opportunities for Other Contractors</p><p>22.5.1 The Contractor shall, upon written request from the Employer or the Project Manager, give all reasonable opportunities for carrying out the work to any other contractors employed by the Employer on or near the Site.</p><p>22.5.2 If the Contractor, upon written request from the Employer or the Project Manager, makes available to other contractors any roads or ways the maintenance for which the Contractor is responsible, permits the use by such other contractors of the Contractor&rsquo;s Equipment, or provides any other service of whatsoever nature for such other contractors, the Employer shall fully compensate the Contractor for any loss or damage caused or occasioned by such other contractors in respect of any such use or service, and shall pay to the Contractor reasonable remuneration for the use of such equipment or the provision of such services.</p><p>22.5.3 The Contractor shall also so arrange to perform its work as to minimize, to the extent possible, interference with the work of other contractors.&nbsp; The Project Manager shall determine the resolution of any difference or conflict that may arise between the Contractor and other contractors and the workers of the Employer in regard to their work.</p><p>22.5.4 The Contractor shall notify the Project Manager promptly of any defects in the other contractors&rsquo; work that come to its notice, and that could affect the Contractor&rsquo;s work.&nbsp; The Project Manager shall determine the corrective measures, if any, required to rectify the situation after inspection of the Facilities.&nbsp; Decisions made by the Project Manager shall be binding on the Contractor.</p><p>22.6&nbsp;&nbsp; Emergency Work</p><p>If, by reason of an emergency arising in connection with and during the execution of the Contract, any protective or remedial work is necessary as a matter of urgency to prevent damage to the Facilities, the Contractor shall immediately carry out such work.</p><p>If the Contractor is unable or unwilling to do such work immediately, the Employer may do or cause such work to be done as the Employer may determine is necessary in order to prevent damage to the Facilities.&nbsp; In such event the Employer shall, as soon as practicable after the occurrence of any such emergency, notify the Contractor in writing of such emergency, the work done and the reasons therefor. If the work done or caused to be done by the Employer is work that the Contractor was liable to do at its own expense under the Contract, the reasonable costs incurred by the Employer in connection therewith shall be paid by the Contractor to the Employer.&nbsp; Otherwise, the cost of such remedial work shall be borne by the Employer.</p><p>22.7&nbsp;&nbsp; Site Clearance</p><p>22.7.1 Site Clearance in Course of Performance:&nbsp; In the course of carrying out the Contract, the Contractor shall keep the Site reasonably free from all unnecessary obstruction, store or remove any surplus materials, clear away any wreckage, rubbish or temporary works from the Site, and remove any Contractor&rsquo;s Equipment no longer required for execution of the Contract.</p><p>22.7.2 Clearance of Site after Completion:&nbsp; After Completion of all parts of the Facilities, the Contractor shall clear away and remove all wreckage, rubbish and debris of any kind from the Site, and shall leave the Site and Facilities in a clean and safe condition.</p><p>22.8&nbsp;&nbsp;&nbsp; Security of the Site</p><p>The Contractor shall be responsible for the security of the Site including providing and maintaining at its own expense all lighting, fencing, and watching when and where necessary for the proper execution and the protection of the Facilities, or for the safety of the owners and occupiers of adjacent property and for the safety of the public.</p><p>If required in the Employer&rsquo;s Requirements, the Contractor shall submit for the Project Manager&rsquo;s No-objection a security management plan that sets the security arrangements for the Site.</p><p>In making security arrangements, the Contractor shall be guided by applicable laws and any other requirements stated in the Employer&rsquo;s Requirements.</p><p>The Contractor shall (i) conduct appropriate background checks on any personnel retained to provide security; (ii) train the security personnel adequately (or determine that they are properly trained) in the use of force (and where applicable, firearms), and appropriate conduct towards Contractor&rsquo;s Personnel, Employer&rsquo;s personnel and affected communities; and (iii) require the security personnel to act within the applicable Laws and any requirements set out in the Employer&rsquo;s Reqquirements.</p><p>The Contractor shall not permit any use of force by security personnel in providing security except when used for preventive and defensive purposes in proportion to the nature and extent of the threat.</p><p>22.9 Protection of the Environment</p><p>The Contractor shall take all necessary measures to:</p><ol><li><ol><li><ol><li>protect the environment (both on and off the Site); and</li><li>limit damage and nuisance to people and property resulting from pollution, noise and other results of the Contractor&rsquo;s operations and/ or activities.</li></ol></li></ol></li></ol><p>The Contractor shall ensure that emissions, surface discharges, effluent and any other pollutants from the Contractor&rsquo;s activities shall exceed neither the values indicated in the Employer&rsquo;s Requirements, nor those prescribed by applicable laws.</p><p>In the event of damage to the environment, property and/or nuisance to people, on or off Site as a result of the Contractor&rsquo;s operations, the Contractor shall agree with the Project Manager the appropriate actions and time scale to remedy, as practicable, the damaged environment to its former condition. The Contractor shall implement such remedies at its cost to the satisfaction of the Project Manager.</p><p>22.10&nbsp; Traffic and Road Safety</p><p>The Contractor shall take all necessary safety measures to avoid the occurrence of incidents and injuries to any third party associated with the use of Contractor&rsquo;s Equipment on public roads or other public infrastructure.</p><p>The Contractor shall monitor and use road safety incidents and accidents reports to identify negative safety issues, and establish and implement necessary measures to resolve them.</p><p>22.11 Cultural Heritage Findings</p><p>All fossils, coins, articles of value or antiquity, structures, groups of structures, and other remains or items of geological, archaeological, paleontological, historical, architectural, religious interest found on the Site shall be placed under the care and custody of the Employer.</p><p>The Contractor shall:</p><ol><li>take all reasonable precautions, including fencing-off the area or site of the finding, to avoid further disturbance and prevent Contractor&rsquo;s Personnel or other persons from removing or damaging any of these findings;</li><li>as soon as practicable after discovery of any such finding, give a notice to the Project Manager, to give the Project Manager the opportunity to promptly inspect and/or investigate the finding before it is disturbed and to issue instructions for dealing with it;</li><li>train relevant Contractor&rsquo;s Personnel on the procedures for handling such findings; and</li><li>implement any other action consistent with the requirements of the Employer&rsquo;s Requirements and relevant laws.</li></ol><p>If the Contractor suffers delay and/or incurs extra costs from complying&nbsp; with the Project Manager instructions,&nbsp; the Contractor shall be entitled to an extension of time under GCC Sub-Clause 40.1, and the amount of such extra costs shall be added to the Contract Price.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>23.&nbsp; Test and Inspection</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>23.1&nbsp;&nbsp; The Contractor shall at its own expense carry out at the place of manufacture and/or on the Site all such tests and/or inspections of the Plant and any part of the Facilities as are specified in the Contract.</p><p>23.2&nbsp;&nbsp; The Employer and the Project Manager or their designated representatives shall be entitled to attend the aforesaid test and/or inspection, provided that the Employer shall bear all costs and expenses incurred in connection with such attendance including, but not limited to, all traveling and board and lodging expenses.</p><p>23.3&nbsp;&nbsp; Whenever the Contractor is ready to carry out any such test and/or inspection, the Contractor shall give a reasonable advance notice of such test and/or inspection and of the place and time thereof to the Project Manager.&nbsp; The Contractor shall obtain from any relevant third Party or manufacturer any necessary permission or consent to enable the Employer and the Project Manager or their designated representatives to attend the test and/or inspection.</p><p>23.4&nbsp;&nbsp; The Contractor shall provide the Project Manager with a certified report of the results of any such test and/or inspection.</p><p>If the Employer or Project Manager or their designated representatives fails to attend the test and/or inspection, or if it is agreed between the Parties that such persons shall not do so, then the Contractor may proceed with the test and/or inspection in the absence of such persons, and may provide the Project Manager with a certified report of the results thereof.</p><p>23.5&nbsp;&nbsp; The Project Manager may require the Contractor to carry out any test and/or inspection not required by the Contract, provided that the Contractor&rsquo;s reasonable costs and expenses incurred in the carrying out of such test and/or inspection shall be added to the Contract Price.&nbsp; Further, if such test and/or inspection impede the progress of work on the Facilities and/or the Contractor&rsquo;s performance of its other obligations under the Contract, due allowance will be made in respect of the Time for Completion and the other obligations so affected.</p><p>23.6&nbsp;&nbsp; If any Plant or any part of the Facilities fails to pass any test and/or inspection, the Contractor shall either rectify or replace such Plant or part of the Facilities and shall repeat the test and/or inspection upon giving a notice under GCC Sub-Clause 23.3.</p><p>23.7&nbsp;&nbsp; If any dispute or difference of opinion shall arise between the Parties in connection with or arising out of the test and/or inspection of the Plant or part of the Facilities that cannot be settled between the Parties within a reasonable period of time, it may be referred to an Dispute Board for determination in accordance with GCC Sub-Clause 46.3.</p><p>23.8&nbsp;&nbsp; The Contractor shall afford the Employer and the Project Manager, at the Employer&rsquo;s expense, access at any reasonable time to any place where the Plant are being manufactured or the Facilities are being installed, in order to inspect the progress and the manner of manufacture or installation, provided that the Project Manager shall give the Contractor a reasonable prior notice. Without prejudice to GCC Sub-Clause 9.7, as instructed by the Project Manager, the Contractor shall also afford other relevant entities (at the Employer&rsquo;s or their respective entities&rsquo; expense, as appropriate) access to the Facilities, to inspect progress and the manner of the execution of the Facilities, carry out environmental and social audit, as appropriate, or carry out any other duty as stated in the Employer&rsquo;s Requirements or as instructed by the Project Manager.</p><p>23.9&nbsp;&nbsp; The Contractor agrees that neither the execution of a test and/or inspection of Plant or any part of the Facilities, nor the attendance by the Employer or the Project Manager, nor the issue of any test certificate pursuant to GCC Sub-Clause 23.4, shall release the Contractor from any other responsibilities under the Contract.</p><p>23.10 No part of the Facilities or foundations shall be covered up on the Site without the Contractor carrying out any test and/or inspection required under the Contract.&nbsp; The Contractor shall give a reasonable notice to the Project Manager whenever any such parts of the Facilities or foundations are ready or about to be ready for test and/or inspection; such test and/or inspection and notice thereof shall be subject to the requirements of the Contract.</p><p>23.11 The Contractor shall uncover any part of the Facilities or foundations, or shall make openings in or through the same as the Project Manager may from time to time require at the Site, and shall reinstate and make good such part or parts.</p><p>If any parts of the Facilities or foundations have been covered up at the Site after compliance with the requirement of GCC Sub-Clause 23.10 and are found to be executed in accordance with the Contract, the expenses of uncovering, making openings in or through, reinstating, and making good the same shall be borne by the Employer, and the Time for Completion shall be reasonably adjusted to the extent that the Contractor has thereby been delayed or impeded in the performance of any of its obligations under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>24.&nbsp; Completion of the Facilities</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>24.1&nbsp;&nbsp; As soon as the Facilities or any part thereof has, in the opinion of the Contractor, been completed operationally and structurally and put in a tight and clean condition as specified in the Employer&rsquo;s Requirements, excluding minor items not materially affecting the operation or safety of the Facilities, the Contractor shall so notify the Employer in writing.</p><p>24.2&nbsp;&nbsp; Within seven (7) days after receipt of the notice from the Contractor under GCC Sub-Clause 24.1, the Employer shall supply the operating and maintenance personnel specified in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer for Precommissioning of the Facilities or any part thereof.</p><p>Pursuant to the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, the Employer shall also provide, within the said seven (7) day period, the raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters required for Precommissioning of the Facilities or any part thereof.</p><p>24.3&nbsp;&nbsp; As soon as reasonably practicable after the operating and maintenance personnel have been supplied by the Employer and the raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters have been provided by the Employer in accordance with GCC Sub-Clause 24.2, the Contractor shall commence Precommissioning of the Facilities or the relevant part thereof in preparation for Commissioning, subject to GCC Sub-Clause 25.5.</p><p>24.4&nbsp;&nbsp; As soon as all works in respect of Precommissioning are completed and, in the opinion of the Contractor, the Facilities or any part thereof is ready for Commissioning, the Contractor shall so notify the Project Manager in writing.</p><p>24.5&nbsp;&nbsp; The Project Manager shall, within fourteen (14) days after receipt of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4, either issue a Completion Certificate in the form specified in the Employer&rsquo;s Requirements (Forms and Procedures), stating that the Facilities or that part thereof have reached Completion as of the date of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4, or notify the Contractor in writing of any defects and/or deficiencies.</p><p>If the Project Manager notifies the Contractor of any defects and/or deficiencies, the Contractor shall then correct such defects and/or deficiencies, and shall repeat the procedure described in GCC Sub-Clause 24.4.</p><p>If the Project Manager is satisfied that the Facilities or that part thereof have reached Completion, the Project Manager shall, within seven (7) days after receipt of the Contractor&rsquo;s repeated notice, issue a Completion Certificate stating that the Facilities or that part thereof have reached Completion as of the date of the Contractor&rsquo;s repeated notice.</p><p>If the Project Manager is not so satisfied, then it shall notify the Contractor in writing of any defects and/or deficiencies within seven (7) days after receipt of the Contractor&rsquo;s repeated notice, and the above procedure shall be repeated.</p><p>24.6&nbsp;&nbsp; If the Project Manager fails to issue the Completion Certificate and fails to inform the Contractor of any defects and/or deficiencies within fourteen (14) days after receipt of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4 or within seven (7) days after receipt of the Contractor&rsquo;s repeated notice under GCC Sub-Clause 24.5, or if the Employer makes use of the Facilities or part thereof, then the Facilities or that part thereof shall be deemed to have reached Completion as of the date of the Contractor&rsquo;s notice or repeated notice, or as of the Employer&rsquo;s use of the Facilities, as the case may be.</p><p>24.7&nbsp;&nbsp; As soon as possible after Completion, the Contractor shall complete all outstanding minor items so that the Facilities are fully in accordance with the requirements of the Contract, failing which the Employer will undertake such completion and deduct the costs thereof from any monies owing to the Contractor.</p><p>24.8&nbsp;&nbsp; Upon Completion, the Employer shall be responsible for the care and custody of the Facilities or the relevant part thereof, together with the risk of loss or damage thereto, and shall thereafter take over the Facilities or the relevant part thereof.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>25. &nbsp; Commissioning and Operational Acceptance</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>25.1&nbsp;&nbsp; <u>Commissioning</u></p><p>25.1.1 Commissioning of the Facilities or any part thereof shall be commenced by the Contractor immediately after issue of the Completion Certificate by the Project Manager, pursuant to GCC Sub-Clause 24.5, or immediately after the date of the deemed Completion, under GCC Sub-Clause 24.6.</p><p>25.1.2 The Employer shall supply the operating and maintenance personnel and all raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters required for Commissioning.</p><p>25.1.3 In accordance with the requirements of the Contract, the Contractor&rsquo;s and Project Manager&rsquo;s advisory personnel shall attend the Commissioning, including the Guarantee Test, and shall advise and assist the Employer.</p><p>25.2&nbsp;&nbsp; <u>Guarantee Test</u></p><p>25.2.1 Subject to GCC Sub-Clause 25.5, the Guarantee Test and repeats thereof shall be conducted by the Contractor during Commissioning of the Facilities or the relevant part thereof to ascertain whether the Facilities or the relevant part can attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees.&nbsp; The Employer shall promptly provide the Contractor with such information as the Contractor may reasonably require in relation to the conduct and results of the Guarantee Test and any repeats thereof.</p><p>25.2.2 If for reasons not attributable to the Contractor, the Guarantee Test of the Facilities or the relevant part thereof cannot be successfully completed within the period from the date of Completion <strong>specified in the PCC</strong> or any other period agreed upon by the Employer and the Contractor, the Contractor shall be deemed to have fulfilled its obligations with respect to the Functional Guarantees, and GCC Sub-Clauses 28.2 and 28.3 shall not apply.</p><p>25.3&nbsp;&nbsp; <u>Operational Acceptance</u></p><p>25.3.1 Subject to GCC Sub-Clause 25.4 below, Operational Acceptance shall occur in respect of the Facilities or any part thereof when</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Guarantee Test has been successfully completed and the Functional Guarantees are met; or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the Guarantee Test has not been successfully completed or has not been carried out for reasons not attributable to the Contractor within the period from the date of Completion specified in the PCC pursuant to GCC Sub-Clause 25.2.2 above or any other period agreed upon by the Employer and the Contractor; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the Contractor has paid the liquidated damages specified in GCC Sub-Clause 28.3 hereof; and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any minor items mentioned in GCC Sub-Clause 24.7 hereof relevant to the Facilities or that part thereof have been completed.</p><p>25.3.2 At any time after any of the events set out in GCC Sub-Clause 25.3.1 have occurred, the Contractor may give a notice to the Project Manager requesting the issue of an Operational Acceptance Certificate in the form provided in the Employer&rsquo;s Requirements (Forms and Procedures) in respect of the Facilities or the part thereof specified in such notice as of the date of such notice.</p><p>25.3.3 The Project Manager shall, after consultation with the Employer, and within seven (7) days after receipt of the Contractor&rsquo;s notice, issue an Operational Acceptance Certificate.</p><p>25.3.4 If within seven (7) days after receipt of the Contractor&rsquo;s notice, the Project Manager fails to issue the Operational Acceptance Certificate or fails to inform the Contractor in writing of the justifiable reasons why the Project Manager has not issued the Operational Acceptance Certificate, the Facilities or the relevant part thereof shall be deemed to have been accepted as of the date of the Contractor&rsquo;s said notice.</p><p>25.4&nbsp;&nbsp; <u>Partial Acceptance</u></p><p>25.4.1 If the Contract specifies that Completion and Commissioning shall be carried out in respect of parts of the Facilities, the provisions relating to Completion and Commissioning including the Guarantee Test shall apply to each such part of the Facilities individually, and the Operational Acceptance Certificate shall be issued accordingly for each such part of the Facilities.</p><p>25.4.2 If a part of the Facilities comprises facilities such as buildings, for which no Commissioning or Guarantee Test is required, then the Project Manager shall issue the Operational Acceptance Certificate for such facility when it attains Completion, provided that the Contractor shall thereafter complete any outstanding minor items that are listed in the Operational Acceptance Certificate.</p><p>25.5 Delayed Precommissioning and/or Guarantee Test</p><p>25.5.1 In the event that the Contractor is unable to proceed with the Precommissioning of the Facilities pursuant to Sub-Clause 24.3, or with the Guarantee Test pursuant to Sub-Clause 25.2, for reasons attributable to the Employer either on account of non availability of other facilities under the responsibilities of other contractor(s), or for reasons beyond the Contractor&rsquo;s control, the provisions leading to &ldquo;deemed&rdquo; completion of activities such as Completion, pursuant to GCC Sub-Clause 24.6, and Operational Acceptance, pursuant to GCC Sub-Clause 25.3.4, and Contractor&rsquo;s obligations regarding Defect Liability Period, pursuant to GCC Sub-Clause 27.2, Functional Guarantee, pursuant to GCC Clause 28, and Care of Facilities, pursuant to GCC Clause 32, and GCC Clause 41.1, Suspension, shall not apply.&nbsp; In this case, the following provisions shall apply.</p><p>25.5.2 When the Contractor is notified by the Project Manager that he will be unable to proceed with the activities and obligations pursuant to above Sub-Clause 25.5.1, the Contractor shall be entitled to the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Time of Completion shall be extended for the period of suspension without imposition of liquidated damages pursuant to GCC Sub-Clause 26.2;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; payments due to the Contractor in accordance with the provision specified in the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, which would not have been payable in normal circumstances due to non-completion of the subject activities, shall be released to the Contractor against submission of a security in the form of a bank guarantee of equivalent amount acceptable to the Employer, and which shall become null and void when the Contractor will have complied with its obligations regarding those payments, subject to the provision of Sub-Clause 25.5.3 below;</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the expenses towards the above security and extension of other securities under the contract, of which validity needs to be extended, shall be reimbursed to the Contractor by the Employer;</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; the additional charges towards the care of the Facilities pursuant to GCC Sub-Clause 32.1 shall be reimbursed to the Contractor by the Employer for the period between the notification mentioned above and the notification mentioned in Sub-Clause 25.5.4 below.&nbsp; The provision of GCC Sub-Clause 33.2 shall apply to the Facilities during the same period.</p><p>25.5.3 In the event that the period of suspension under above Sub-Clause 25.5.1 actually exceeds one hundred eighty (180) days, the Employer and Contractor shall mutually agree to any additional compensation payable to the Contractor.</p><p>25.5.4 When the Contractor is notified by the Project Manager that the Plant is ready for Precommissioning, the Contractor shall proceed without delay in performing Precommissioning in accordance with Clause 24.</p></td></tr></tbody></table><ol><li><strong>Guarantees and Liabilities</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:612px\"><tbody><tr><td style=\"vertical-align:top; width:156px\"><p><strong>26.&nbsp; Completion Time Guarantee</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>26.1&nbsp;&nbsp; The Contractor guarantees that it shall attain Completion of the Facilities (or a part for which a separate time for completion is specified) within the Time for Completion specified in the PCC pursuant to GCC Sub-Clause 8.2, or within such extended time to which the Contractor shall be entitled under GCC Clause 40&nbsp; hereof.</p><p>26.2&nbsp;&nbsp; If the Contractor fails to attain Completion of the Facilities or any part thereof within the Time for Completion or any extension thereof under GCC Clause 40, the Contractor shall pay to the Employer liquidated damages in the amount <strong>specified in the PCC</strong> as a percentage rate of the Contract Price or the relevant part thereof.&nbsp; The aggregate amount of such liquidated damages shall in no event exceed the amount <strong>specified as &ldquo;Maximum&rdquo; in the PCC</strong> as a percentage rate of the Contract Price.&nbsp; Once the &ldquo;Maximum&rdquo; is reached, the Employer may consider termination of the Contract, pursuant to GCC Sub-Clause 42.2.2.</p><p>Such payment shall completely satisfy the Contractor&rsquo;s obligation to attain Completion of the Facilities or the relevant part thereof within the Time for Completion or any extension thereof under GCC Clause 40.&nbsp; The Contractor shall have no further liability whatsoever to the Employer in respect thereof.</p><p>However, the payment of liquidated damages shall not in any way relieve the Contractor from any of its obligations to complete the Facilities or from any other obligations and liabilities of the Contractor under the Contract.</p><p>Save for liquidated damages payable under this GCC Sub-Clause 26.2, the failure by the Contractor to attain any milestone or other act, matter or thing by any date specified in the Appendix to the Contract Agreement titled Time Schedule, and/or other program of work prepared pursuant to GCC Sub-Clause 18.2 shall not render the Contractor liable for any loss or damage thereby suffered by the Employer.</p><p>26.3&nbsp;&nbsp; If the Contractor attains Completion of the Facilities or any part thereof before the Time for Completion or any extension thereof under GCC Clause 40, the Employer shall pay to the Contractor a bonus in the amount <strong>specified in the PCC. </strong>&nbsp;The aggregate amount of such bonus shall in no event exceed the amount <strong>specified as &ldquo;Maximum&rdquo; in the PCC.</strong></p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>27.&nbsp; Defect Liability</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>27.1&nbsp;&nbsp; The Contractor warrants that the Facilities or any part thereof shall be free from defects in the design, engineering, materials and workmanship of the Plant supplied and of the work executed.</p><p>27.2&nbsp;&nbsp; The Defect Liability Period shall be five hundred and forty (540) days from the date of Completion of the Facilities (or any part thereof) or one year from the date of Operational Acceptance of the Facilities (or any part thereof), whichever first occurs, unless specified otherwise in the PCC pursuant to GCC Sub-Clause 27.10.</p><p>If during the Defect Liability Period any defect should be found in the design, engineering, materials and workmanship of the Plant supplied or of the work executed by the Contractor, the Contractor shall promptly, in consultation and agreement with the Employer regarding appropriate remedying of the defects, and at its cost, repair, replace or otherwise make good as the Contractor shall determine at its discretion, such defect as well as any damage to the Facilities caused by such defect.&nbsp; The Contractor shall not be responsible for the repair, replacement or making good of any defect or of any damage to the Facilities arising out of or resulting from any of the following causes:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; improper operation or maintenance of the Facilities by the Employer;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; operation of the Facilities outside specifications provided in the Contract; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; normal wear and tear.</p><p>27.3&nbsp;&nbsp; The Contractor&rsquo;s obligations under this GCC Clause 27 shall not apply to:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any materials that are supplied by the Employer under GCC Sub-Clause 21.2, are normally consumed in operation, or have a normal life shorter than the Defect Liability Period stated herein;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any designs, specifications or other data designed, supplied or specified by or on behalf of the Employer or any matters for which the Contractor has disclaimed responsibility herein; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any other materials supplied or any other work executed by or on behalf of the Employer, except for the work executed by the Employer under GCC Sub-Clause 27.7.</p><p>27.4&nbsp;&nbsp; The Employer shall give the Contractor a notice stating the nature of any such defect together with all available evidence thereof, promptly following the discovery thereof.&nbsp; The Employer shall afford all reasonable opportunity for the Contractor to inspect any such defect.</p><p>27.5&nbsp;&nbsp; The Employer shall afford the Contractor all necessary access to the Facilities and the Site to enable the Contractor to perform its obligations under this GCC Clause 27.</p><p>The Contractor may, with the consent of the Employer, remove from the Site any Plant or any part of the Facilities that are defective if the nature of the defect, and/or any damage to the Facilities caused by the defect, is such that repairs cannot be expeditiously carried out at the Site.</p><p>27.6&nbsp;&nbsp; If the repair, replacement or making good is of such a character that it may affect the efficiency of the Facilities or any part thereof, the Employer may give to the Contractor a notice requiring that tests of the defective part of the Facilities shall be made by the Contractor immediately upon completion of such remedial work, whereupon the Contractor shall carry out such tests.</p><p>If such part fails the tests, the Contractor shall carry out further repair, replacement or making good, as the case may be, until that part of the Facilities passes such tests.&nbsp; The tests shall be agreed upon by the Employer and the Contractor.</p><p>27.7&nbsp;&nbsp; If the Contractor fails to commence the work necessary to remedy such defect or any damage to the Facilities caused by such defect within a reasonable time (which shall in no event be considered to be less than fifteen (15) days), the Employer may, following notice to the Contractor, proceed to do such work, and the reasonable costs incurred by the Employer in connection therewith shall be paid to the Employer by the Contractor or may be deducted by the Employer from any monies due the Contractor or claimed under the Performance Security.</p><p>27.8&nbsp;&nbsp; If the Facilities or any part thereof cannot be used by reason of such defect and/or making good of such defect, the Defect Liability Period of the Facilities or such part, as the case may be, shall be extended by a period equal to the period during which the Facilities or such part cannot be used by the Employer because of any of the aforesaid reasons.</p><p>27.9&nbsp;&nbsp; Except as provided in GCC Clauses 27 and 33, the Contractor shall be under no liability whatsoever and howsoever arising, and whether under the Contract or at law, in respect of defects in the Facilities or any part thereof, the Plant, design or engineering or work executed that appear after Completion of the Facilities or any part thereof, except where such defects are the result of the gross negligence, fraud, or criminal or willful action of the Contractor.</p><p>27.10 In addition, any such component of the Facilities, and during the period of time as may be <strong>specified in the PCC,</strong> shall be subject to an extended defect liability period.&nbsp; Such obligation of the Contractor shall be in addition to the defect liability period specified under GCC Sub-Clause 27.2.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>28.&nbsp; Functional Guarantees</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>28.1&nbsp;&nbsp; The Contractor guarantees that during the Guarantee Test, the Facilities and all parts thereof shall attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, subject to and upon the conditions therein specified.</p><p>28.2&nbsp;&nbsp; If, for reasons attributable to the Contractor, the minimum level of the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, are not met either in whole or in part, the Contractor shall at its cost and expense make such changes, modifications and/or additions to the Plant or any part thereof as may be necessary to meet at least the minimum level of such Guarantees.&nbsp; The Contractor shall notify the Employer upon completion of the necessary changes, modifications and/or additions, and shall request the Employer to repeat the Guarantee Test until the minimum level of the Guarantees has been met.&nbsp; If the Contractor eventually fails to meet the minimum level of Functional Guarantees, the Employer may consider termination of the Contract, pursuant to GCC Sub-Clause 42.2.2.</p><p>28.3&nbsp;&nbsp; If, for reasons attributable to the Contractor, the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, are not attained either in whole or in part, but the minimum level of the Functional Guarantees specified in the said Appendix to the Contract Agreement is met, the Contractor shall, at the Contractor&rsquo;s option, either</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; make such changes, modifications and/or additions to the Facilities or any part thereof that are necessary to attain the Functional Guarantees at its cost and expense, and shall request the Employer to repeat the Guarantee Test or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; pay liquidated damages to the Employer in respect of the failure to meet the Functional Guarantees in accordance with the provisions in the&nbsp; Appendix to the Contract Agreement titled Functional Guarantees.</p><p>28.4&nbsp;&nbsp; The payment of liquidated damages under GCC Sub-Clause 28.3, up to the limitation of liability specified in the Appendix to the Contract Agreement titled Functional Guarantees, shall completely satisfy the Contractor&rsquo;s guarantees under GCC Sub-Clause 28.3, and the Contractor shall have no further liability whatsoever to the Employer in respect thereof.&nbsp; Upon the payment of such liquidated damages by the Contractor, the Project Manager shall issue the Operational Acceptance Certificate for the Facilities or any part thereof in respect of which the liquidated damages have been so paid.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>29.&nbsp; Patent Indemnity</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>29.1&nbsp;&nbsp; The Contractor shall, subject to the Employer&rsquo;s compliance with GCC Sub-Clause 29.2, indemnify and hold harmless the Employer and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, which the Employer may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright or other intellectual property right registered or otherwise existing at the date of the Contract by reason of:&nbsp; (a) the installation of the Facilities by the Contractor or the use of the Facilities in the country where the Site is located; and (b) the sale of the products produced by the Facilities in any country.</p><p>Such indemnity shall not cover any use of the Facilities or any part thereof other than for the purpose indicated by or to be reasonably inferred from the Contract, any infringement resulting from the use of the Facilities or any part thereof, or any products produced thereby in association or combination with any other equipment, Plant or materials not supplied by the Contractor, pursuant to the Contract Agreement.</p><p>29.2&nbsp;&nbsp; If any proceedings are brought or any claim is made against the Employer arising out of the matters referred to in GCC Sub-Clause 29.1, the Employer shall promptly give the Contractor a notice thereof, and the Contractor may at its own expense and in the Employer&rsquo;s name conduct such proceedings or claim and any negotiations for the settlement of any such proceedings or claim.</p><p>If the Contractor fails to notify the Employer within twenty-eight (28) days after receipt of such notice that it intends to conduct any such proceedings or claim, then the Employer shall be free to conduct the same on its own behalf.&nbsp; Unless the Contractor has so failed to notify the Employer within the twenty-eight (28) day period, the Employer shall make no admission that may be prejudicial to the defense of any such proceedings or claim.</p><p>The Employer shall, at the Contractor&rsquo;s request, afford all available assistance to the Contractor in conducting such proceedings or claim, and shall be reimbursed by the Contractor for all reasonable expenses incurred in so doing.</p><p>29.3&nbsp;&nbsp; The Employer shall indemnify and hold harmless the Contractor and its employees, officers and Subcontractors from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, which the Contractor may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright or other intellectual property right registered or otherwise existing at the date of the Contract arising out of or in connection with any design, data, drawing, specification, or other documents or materials provided or designed by or on behalf of the Employer.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>30.&nbsp; Limitation of Liability</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>30.1&nbsp;&nbsp; Except in cases of criminal negligence or willful misconduct,</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; neither Party shall be liable to the other Party, whether in contract, tort, or otherwise, for any indirect or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs, which may be suffered by the other Party in connection with the Contract, other than specifically provided as any obligation of the Party in the Contract, and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the aggregate liability of the Contractor to the Employer, whether under the Contract, in tort or otherwise, shall not exceed the amount resulting from the application of the multiplier specified in the PCC, to the Contract Price or, if a multiplier is not so specified, the total Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the Contractor to indemnify the Employer with respect to patent infringement.</p></td></tr></tbody></table><ol><li><strong>Risk Distribution</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>31.&nbsp; Transfer of Ownership</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>31.1&nbsp;&nbsp; Ownership of the Plant (including spare parts) to be imported into the country where the Site is located shall be transferred to the Employer upon loading on to the mode of transport to be used to convey the Plant from the country of origin to that country.</p><p>31.2&nbsp;&nbsp; Ownership of the Plant (including spare parts) procured in the country where the Site is located shall be transferred to the Employer when the Plant are brought on to the Site.</p><p>31.3&nbsp;&nbsp; Ownership of the Contractor&rsquo;s Equipment used by the Contractor and its Subcontractors in connection with the Contract shall remain with the Contractor or its Subcontractors.</p><p>31.4&nbsp;&nbsp; Ownership of any Plant in excess of the requirements for the Facilities shall revert to the Contractor upon Completion of the Facilities or at such earlier time when the Employer and the Contractor agree that the Plant in question are no longer required for the Facilities.</p><p>31.5&nbsp;&nbsp; Notwithstanding the transfer of ownership of the Plant, the responsibility for care and custody thereof together with the risk of loss or damage thereto shall remain with the Contractor pursuant to GCC Clause 32 (Care of Facilities) hereof until Completion of the Facilities or the part thereof in which such Plant are incorporated.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>32.&nbsp; Care of Facilities</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>32.1&nbsp;&nbsp; The Contractor shall be responsible for the care and custody of the Facilities or any part thereof until the date of Completion of the Facilities pursuant to GCC Clause 24 or, where the Contract provides for Completion of the Facilities in parts, until the date of Completion of the relevant part, and shall make good at its own cost any loss or damage that may occur to the Facilities or the relevant part thereof from any cause whatsoever during such period.&nbsp; The Contractor shall also be responsible for any loss or damage to the Facilities caused by the Contractor or its Subcontractors in the course of any work carried out, pursuant to GCC Clause 27.&nbsp; Notwithstanding the foregoing, the Contractor shall not be liable for any loss or damage to the Facilities or that part thereof caused by reason of any of the matters specified or referred to in paragraphs (a), (b) and (c) of GCC Sub-Clauses 32.2 and 38.1.</p><p>32.2&nbsp;&nbsp; If any loss or damage occurs to the Facilities or any part thereof or to the Contractor&rsquo;s temporary facilities by reason of</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; insofar as they relate to the country where the Site is located, nuclear reaction, nuclear radiation, radioactive contamination, pressure wave caused by aircraft or other aerial objects, or any other occurrences that an experienced contractor could not reasonably foresee, or if reasonably foreseeable could not reasonably make provision for or insure against, insofar as such risks are not normally insurable on the insurance market and are mentioned in the general exclusions of the policy of insurance, including War Risks and Political Risks, taken out under GCC Clause 34 hereof; or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any use or occupation by the Employer or any third Party other than a Subcontractor, authorized by the Employer of any part of the Facilities; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any use of or reliance upon any design, data or specification provided or designated by or on behalf of the Employer, or any such matter for which the Contractor has disclaimed responsibility herein,</p><p>the Employer shall pay to the Contractor all sums payable in respect of the Facilities executed, notwithstanding that the same be lost, destroyed or damaged, and will pay to the Contractor the replacement value of all temporary facilities and all parts thereof lost, destroyed or damaged.&nbsp; If the Employer requests the Contractor in writing to make good any loss or damage to the Facilities thereby occasioned, the Contractor shall make good the same at the cost of the Employer in accordance with GCC Clause 39.&nbsp; If the Employer does not request the Contractor in writing to make good any loss or damage to the Facilities thereby occasioned, the Employer shall either request a change in accordance with GCC Clause 39, excluding the performance of that part of the Facilities thereby lost, destroyed or damaged, or, where the loss or damage affects a substantial part of the Facilities, the Employer shall terminate the Contract pursuant to GCC Sub-Clause 42.1 hereof.</p><p>32.3&nbsp;&nbsp; The Contractor shall be liable for any loss of or damage to any Contractor&rsquo;s Equipment, or any other property of the Contractor used or intended to be used for purposes of the Facilities, except (i) as mentioned in GCC Sub-Clause 32.2 with respect to the Contractor&rsquo;s temporary facilities, and (ii) where such loss or damage arises by reason of any of the matters specified in GCC Sub-Clauses 32.2 (b) and (c) and 38.1.</p><p>32.4&nbsp;&nbsp; With respect to any loss or damage caused to the Facilities or any part thereof or to the Contractor&rsquo;s Equipment by reason of any of the matters specified in GCC Sub-Clause 38.1, the provisions of GCC Sub-Clause 38.3 shall apply.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>33.&nbsp; Loss of or Damage to Property; Accident or Injury to Workers; Indemnifica&shy;tion</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>33.1&nbsp;&nbsp; Subject to GCC Sub-Clause 33.3, the Contractor shall indemnify and hold harmless the Employer and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, in respect of the death or injury of any person or loss of or damage to any property other than the Facilities whether accepted or not, arising in connection with the supply and installation of the Facilities and by reason of the negligence of the Contractor or its Subcontractors, or their employees, officers or agents, except any injury, death or property damage caused by the negligence of the Employer, its contractors, employees, officers or agents.</p><p>33.2&nbsp;&nbsp; If any proceedings are brought or any claim is made against the Employer that might subject the Contractor to liability under GCC Sub-Clause 33.1, the Employer shall promptly give the Contractor a notice thereof and the Contractor may at its own expense and in the Employer&rsquo;s name conduct such proceedings or claim and any negotiations for the settlement of any such proceedings or claim.</p><p>If the Contractor fails to notify the Employer within twenty-eight (28) days after receipt of such notice that it intends to conduct any such proceedings or claim, then the Employer shall be free to conduct the same on its own behalf.&nbsp; Unless the Contractor has so failed to notify the Employer within the twenty-eight (28) day period, the Employer shall make no admission that may be prejudicial to the defense of any such proceedings or claim.</p><p>The Employer shall, at the Contractor&rsquo;s request, afford all available assistance to the Contractor in conducting such proceedings or claim, and shall be reimbursed by the Contractor for all reasonable expenses incurred in so doing.</p><p>33.3&nbsp;&nbsp; The Employer shall indemnify and hold harmless the Contractor and its employees, officers and Subcontractors from any liability for loss of or damage to property of the Employer, other than the Facilities not yet taken over, that is caused by fire, explosion or any other perils, in excess of the amount recoverable from insurances procured under GCC Clause 34, provided that such fire, explosion or other perils were not caused by any act or failure of the Contractor.</p><p>33.4&nbsp;&nbsp; The Party entitled to the benefit of an indemnity under this GCC Clause 33 shall take all reasonable measures to mitigate any loss or damage which has occurred.&nbsp; If the Party fails to take such measures, the other Party&rsquo;s liabilities shall be correspondingly reduced.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>34.&nbsp; Insurance</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>34.1&nbsp;&nbsp; To the extent specified in the Appendix to the Contract Agreement titled Insurance Requirements, the Contractor shall at its expense take out and maintain in effect, or cause to be taken out and maintained in effect, during the performance of the Contract, the insurances set forth below in the sums and with the deductibles and other conditions specified in the said Appendix.&nbsp; The identity of the insurers and the form of the policies shall be subject to the approval of the Employer, who should not unreasonably withhold such approval.</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; <u>Cargo Insurance During Transport</u></p><p>Covering loss or damage occurring while in transit from the Contractor&rsquo;s or Subcontractor&rsquo;s works or stores until arrival at the Site, to the Plant (including spare parts therefor) and to the Contractor&rsquo;s Equipment.</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; <u>Installation All Risks Insurance</u></p><p>Covering physical loss or damage to the Facilities at the Site, occurring prior to Completion of the Facilities, with an extended maintenance coverage for the Contractor&rsquo;s liability in respect of any loss or damage occurring during the Defect Liability Period while the Contractor is on the Site for the purpose of performing its obligations during the Defect Liability Period.</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; <u>Third Party Liability Insurance</u></p><p>Covering bodily injury or death suffered by third Parties including the Employer&rsquo;s personnel, and loss of or damage to property occurring in connection with the supply and installation of the Facilities.</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; <u>Automobile Liability Insurance</u></p><p>Covering use of all vehicles used by the Contractor or its Subcontractors, whether or not owned by them, in connection with the execution of the Contract.</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; <u>Workers&rsquo; Compensation</u></p><p>In accordance with the statutory requirements applicable in any country where the Contract or any part thereof is executed.</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; <u>Employer&rsquo;s Liability</u></p><p>In accordance with the statutory requirements applicable in any country where the Contract or any part thereof is executed.</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; <u>Other Insurances</u></p><p>Such other insurances as may be specifically agreed upon by the Parties hereto as listed in the Appendix to the Contract Agreement titled Insurance Requirements.</p><p>34.2&nbsp;&nbsp; The Employer shall be named as co-insured under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Third Party Liability, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances, and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1 except for the Cargo Insurance During Transport, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances.&nbsp; All insurer&rsquo;s rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.</p><p>34.3&nbsp;&nbsp; The Contractor shall, in accordance with the provisions of the Appendix to the Contract Agreement titled Insurance Requirements, deliver to the Employer certificates of insurance or copies of the insurance policies as evidence that the required policies are in full force and effect.&nbsp; The certificates shall provide that no less than twenty-one (21) days&rsquo; notice shall be given to the Employer by insurers prior to cancellation or material modification of a policy.</p><p>34.4&nbsp;&nbsp; The Contractor shall ensure that, where applicable, its Subcontractor(s) shall take out and maintain in effect adequate insurance policies for their personnel and vehicles and for work executed by them under the Contract, unless such Subcontractors are covered by the policies taken out by the Contractor.</p><p>34.5&nbsp;&nbsp; The Employer shall at its expense take out and maintain in effect during the performance of the Contract those insurances specified in the&nbsp; Appendix to the Contract Agreement titled Insurance Requirements, in the sums and with the deductibles and other conditions specified in the said Appendix.&nbsp; The Contractor and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all such policies.&nbsp; All insurers&rsquo; rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.&nbsp; The Employer shall deliver to the Contractor satisfactory evidence that the required insurances are in full force and effect.&nbsp; The policies shall provide that not less than twenty-one (21) days&rsquo; notice shall be given to the Contractor by all insurers prior to any cancellation or material modification of the policies.&nbsp; If so requested by the Contractor, the Employer shall provide copies of the policies taken out by the Employer under this GCC Sub-Clause 34.5.</p><p>34.6&nbsp;&nbsp; If the Contractor fails to take out and/or maintain in effect the insurances referred to in GCC Sub-Clause 34.1, the Employer may take out and maintain in effect any such insurances and may from time to time deduct from any amount due the Contractor under the Contract any premium that the Employer shall have paid to the insurer, or may otherwise recover such amount as a debt due from the Contractor.&nbsp; If the Employer fails to take out and/or maintain in effect the insurances referred to in GCC 34.5, the Contractor may take out and maintain in effect any such insurances and may from time to time deduct from any amount due the Employer under the Contract any premium that the Contractor shall have paid to the insurer, or may otherwise recover such amount as a debt due from the Employer.&nbsp; If the Contractor fails to or is unable to take out and maintain in effect any such insurances, the Contractor shall nevertheless have no liability or responsibility towards the Employer, and the Contractor shall have full recourse against the Employer for any and all liabilities of the Employer herein.</p><p>34.7&nbsp;&nbsp; Unless otherwise provided in the Contract, the Contractor shall prepare and conduct all and any claims made under the policies effected by it pursuant to this GCC Clause 34, and all monies payable by any insurers shall be paid to the Contractor.&nbsp; The Employer shall give to the Contractor all such reasonable assistance as may be required by the Contractor.&nbsp; With respect to insurance claims in which the Employer&rsquo;s interest is involved, the Contractor shall not give any release or make any compromise with the insurer without the prior written consent of the Employer.&nbsp; With respect to insurance claims in which the Contractor&rsquo;s interest is involved, the Employer shall not give any release or make any compromise with the insurer without the prior written consent of the Contractor.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>35.&nbsp; Unforeseen Conditions</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>35.1&nbsp;&nbsp; If, during the execution of the Contract, the Contractor shall encounter on the Site any physical conditions other than climatic conditions, or artificial obstructions that could not have been reasonably foreseen prior to the date of the Contract Agreement by an experienced contractor on the basis of reasonable examination of the data relating to the Facilities including any data as to boring tests, provided by the Employer, and on the basis of information that it could have obtained from a visual inspection of the Site if access thereto was available, or other data readily available to it relating to the Facilities, and if the Contractor determines that it will in consequence of such conditions or obstructions incur additional cost and expense or require additional time to perform its obligations under the Contract that would not have been required if such physical conditions or artificial obstructions had not been encountered, the Contractor shall promptly, and before performing additional work or using additional Plant or Contractor&rsquo;s Equipment, notify the Project Manager in writing of</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the physical conditions or artificial obstructions on the Site that could not have been reasonably foreseen;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the additional work and/or Plant and/or Contractor&rsquo;s Equipment required, including the steps which the Contractor will or proposes to take to overcome such conditions or obstructions;</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the extent of the anticipated delay; and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; the additional cost and expense that the Contractor is likely to incur.</p><p>On receiving any notice from the Contractor under this GCC Sub-Clause 35.1, the Project Manager shall promptly consult with the Employer and Contractor and decide upon the actions to be taken to overcome the physical conditions or artificial obstructions encountered.&nbsp; Following such consultations, the Project Manager shall instruct the Contractor, with a copy to the Employer, of the actions to be taken.</p><p>35.2&nbsp;&nbsp; Any reasonable additional cost and expense incurred by the Contractor in following the instructions from the Project Manager to overcome such physical conditions or artificial obstructions referred to in GCC Sub-Clause 35.1 shall be paid by the Employer to the Contractor as an addition to the Contract Price.</p><p>If the Contractor is delayed or impeded in the performance of the Contract because of any such physical conditions or artificial obstructions referred to in GCC Sub-Clause 35.1, the Time for Completion shall be extended in accordance with GCC Clause 40.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>36.&nbsp; Change in Laws and Regulations</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>36.1&nbsp;&nbsp; If, after the date twenty-eight (28) days prior to the date of Bid submission, in the country where the Site is located, any law, regulation, ordinance, order or by-law having the force of law is enacted, promulgated, abrogated or changed which shall be deemed to include any change in interpretation or application by the competent authorities, that subsequently affects the costs and expenses of the Contractor and/or the Time for Completion, the Contract Price shall be correspondingly increased or decreased, and/or the Time for Completion shall be reasonably adjusted to the extent that the Contractor has thereby been affected in the performance of any of its obligations under the Contract.&nbsp; Notwithstanding the foregoing, such additional or reduced costs shall not be separately paid or credited if the same has already been accounted for in the price adjustment provisions where applicable, in accordance with the PCC pursuant to GCC Sub-Clause 11.2.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>37.&nbsp; Force Majeure</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>37.1&nbsp;&nbsp; &ldquo;Force Majeure&rdquo; shall mean any event beyond the reasonable control of the Employer or of the Contractor, as the case may be, and which is unavoidable notwithstanding the reasonable care of the Party affected, and shall include, without limitation, the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; war, hostilities or warlike operations whether a state of war be declared or not, invasion, act of foreign enemy and civil war</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; rebellion, revolution, insurrection, mutiny, usurpation of civil or military government, conspiracy, riot, civil commotion and terrorist acts</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; confiscation, nationalization, mobilization, commandeering or requisition by or under the order of any government or de jure or de facto authority or ruler or any other act or failure to act of any local state or national government authority</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; strike, sabotage, lockout, embargo, import restriction, port congestion, lack of usual means of public transportation and communication, industrial dispute, shipwreck, shortage or restriction of power supply, epidemics, quarantine and plague</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; earthquake, landslide, volcanic activity, fire, flood or inundation, tidal wave, typhoon or cyclone, hurricane, storm, lightning, or other inclement weather condition, nuclear and pressure waves or other natural or physical disaster</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; shortage of labor, materials or utilities where caused by circumstances that are themselves Force Majeure.</p><p>37.2&nbsp;&nbsp; If either Party is prevented, hindered or delayed from or in performing any of its obligations under the Contract by an event of Force Majeure, then it shall notify the other in writing of the occurrence of such event and the circumstances thereof within fourteen (14) days after the occurrence of such event.</p><p>37.3&nbsp;&nbsp; The Party who has given such notice shall be excused from the performance or punctual performance of its obligations under the Contract for so long as the relevant event of Force Majeure continues and to the extent that such Party&rsquo;s performance is prevented, hindered or delayed.&nbsp; The Time for Completion shall be extended in accordance with GCC Clause 40.</p><p>37.4&nbsp;&nbsp; The Party or Parties affected by the event of Force Majeure shall use reasonable efforts to mitigate the effect thereof upon its or their performance of the Contract and to fulfill its or their obligations under the Contract, but without prejudice to either Party&rsquo;s right to terminate the Contract under GCC Sub-Clauses 37.6 and 38.5.</p><p>37.5</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No delay or nonperformance by either Party hereto caused by the occurrence of any event of Force Majeure shall</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; constitute a default or breach of the Contract, or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; give rise to any claim for damages or additional cost or expense occasioned thereby, subject to GCC Sub-Clauses 32.2, 38.3 and 38.4</p><p>if and to the extent that such delay or nonperformance is caused by the occurrence of an event of Force Majeure.</p><p>37.6&nbsp;&nbsp; If the performance of the Contract is substantially prevented, hindered or delayed for a single period of more than sixty (60) days or an aggregate period of more than one hundred and twenty (120) days on account of one or more events of Force Majeure during the currency of the Contract, the Parties will attempt to develop a mutually satisfactory solution, failing which either Party may terminate the Contract by giving a notice to the other, but without prejudice to either Party&rsquo;s right to terminate the Contract under GCC Sub-Clause 38.5.</p><p>37.7&nbsp;&nbsp; In the event of termination pursuant to GCC Sub-Clause 37.6, the rights and obligations of the Employer and the Contractor shall be as specified in GCC Sub-Clauses 42.1.2 and 42.1.3.</p><p>37.8&nbsp;&nbsp; Notwithstanding GCC Sub-Clause 37.5, Force Majeure shall not apply to any obligation of the Employer to make payments to the Contractor herein.</p></td></tr><tr><td style=\"height:84px; vertical-align:top; width:144px\"><p><strong>38.&nbsp; War Risks</strong></p></td><td style=\"height:84px; vertical-align:top; width:466px\"><p>38.1&nbsp;&nbsp; &ldquo;War Risks&rdquo; shall mean any event specified in paragraphs (a) and (b) of GCC Sub-Clause 37.1 and any explosion or impact of any mine, bomb, shell, grenade or other projectile, missile, munitions or explosive of war, occurring or existing in or near the country (or countries) where the Site is located.</p><p>38.2&nbsp;&nbsp; Notwithstanding anything contained in the Contract, the Contractor shall have no liability whatsoever for or with respect to</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; destruction of or damage to Facilities, Plant, or any part thereof;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; destruction of or damage to property of the Employer or any third Party; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; injury or loss of life</p><p>if such destruction, damage, injury or loss of life is caused by any War Risks, and the Employer shall indemnify and hold the Contractor harmless from and against any and all claims, liabilities, actions, lawsuits, damages, costs, charges or expenses arising in consequence of or in connection with the same.</p><p>38.3&nbsp;&nbsp; If the Facilities or any Plant or Contractor&rsquo;s Equipment or any other property of the Contractor used or intended to be used for the purposes of the Facilities shall sustain destruction or damage by reason of any War Risks, the Employer shall pay the Contractor for</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any part of the Facilities or the Plant so destroyed or damaged to the extent not already paid for by the Employer</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; and so far as may be required by the Employer, and as may be necessary for completion of the Facilities</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; replacing or making good any Contractor&rsquo;s Equipment or other property of the Contractor so destroyed or damaged</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; replacing or making good any such destruction or damage to the Facilities or the Plant or any part thereof .</p><p>If the Employer does not require the Contractor to replace or make good any such destruction or damage to the Facilities, the Employer shall either request a change in accordance with GCC Clause 39, excluding the performance of that part of the Facilities thereby destroyed or damaged or, where the loss, destruction or damage affects a substantial part of the Facilities, shall terminate the Contract, pursuant to GCC Sub-Clause 42.1.</p><p>If the Employer requires the Contractor to replace or make good on any such destruction or damage to the Facilities, the Time for Completion shall be extended in accordance with GCC 40.</p><p>38.4&nbsp;&nbsp; Notwithstanding anything contained in the Contract, the Employer shall pay the Contractor for any increased costs or incidentals to the execution of the Contract that are in any way attributable to, consequent on, resulting from, or in any way connected with any War Risks, provided that the Contractor shall as soon as practicable notify the Employer in writing of any such increased cost.</p><p>38.5&nbsp;&nbsp; If during the performance of the Contract any War Risks shall occur that financially or otherwise materially affect the execution of the Contract by the Contractor, the Contractor shall use its reasonable efforts to execute the Contract with due and proper consideration given to the safety of its and its Subcontractors&rsquo; personnel engaged in the work on the Facilities, provided, however, that if the execution of the work on the Facilities becomes impossible or is substantially prevented for a single period of more than sixty (60) days or an aggregate period of more than one hundred and twenty (120) days on account of any War Risks, the Parties will attempt to develop a mutually satisfactory solution, failing which either Party may terminate the Contract by giving a notice to the other.</p><p>38.6&nbsp;&nbsp; In the event of termination pursuant to GCC Sub-Clauses 38.3 or 38.5, the rights and obligations of the Employer and the Contractor shall be specified in GCC Sub-Clauses 42.1.2 and 42.1.3.</p></td></tr></tbody></table><ol><li><strong>Change in Contract Elements</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>39.&nbsp; Change in the Facilities</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>39.1&nbsp;&nbsp; <u>Introducing a Change</u></p><p>39.1.1 Subject to GCC Sub-Clauses 39.2.5 and 39.2.7, the Employer shall have the right to propose, and subsequently require, that the Project Manager order the Contractor from time to time during the performance of the Contract to make any change, modification, addition or deletion to, in or from the Facilities hereinafter called &ldquo;Change&rdquo;, provided that such Change falls within the general scope of the Facilities and does not constitute unrelated work and that it is technically practicable, taking into account both the state of advancement of the Facilities and the technical compatibility of the Change envisaged with the nature of the Facilities as specified in the Contract.</p><p>39.1.2 Value Engineering: The Contractor may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;</p><ol><li>the proposed change(s), and a description of the difference to the existing contract requirements;</li><li>a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Employer may incur in implementing the value engineering proposal; and</li><li>a description of any effect(s) of the change on performance/functionality.</li></ol><p>The Employer may accept the value engineering proposal if the proposal demonstrates benefits that:</p><ol><li>accelerates the delivery period; or</li><li>reduces the Contract Price or the life cycle costs to the Employer; or</li><li>improves the quality, efficiency, safety or sustainability of the Facilities; or</li><li>yields any other benefits to the Employer,</li></ol><p>without compromising the necessary functions of the Facilities.</p><p>If the value engineering proposal is approved by the Employer and results in:</p><ol><li>a reduction of the Contract Price; the amount to be paid to the Contractor shall be the percentage specified in the PCC of the reduction in the Contract Price; or</li><li>an increase in the Contract Price; but results in a reduction in life cycle costs due to any benefit described in (a) to (d) above, the amount to be paid to the Contractor shall be the full increase in the Contract Price.</li></ol><p>39.1.3 Notwithstanding GCC Sub-Clauses 39.1.1 and 39.1.2, no change made necessary because of any default of the Contractor in the performance of its obligations under the Contract shall be deemed to be a Change, and such change shall not result in any adjustment of the Contract Price or the Time for Completion.</p><p>39.1.4 The procedure on how to proceed with and execute Changes is specified in GCC Sub-Clauses 39.2 and 39.3, and further details and forms are provided in the Employer&rsquo;s Requirements (Forms and Procedures).</p><p>39.2&nbsp;&nbsp; <u>Changes Originating from Employer</u></p><p>39.2.1 If the Employer proposes a Change pursuant to GCC Sub-Clause 39.1.1, it shall send to the Contractor a &ldquo;Request for Change Proposal,&rdquo; requiring the Contractor to prepare and furnish to the Project Manager as soon as reasonably practicable a &ldquo;Change Proposal,&rdquo; which shall include the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; brief description of the Change</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on the Time for Completion</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; estimated cost of the Change</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on Functional Guarantees (if any)</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on the Facilities</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on any other provisions of the Contract: and</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;any additional documents as <strong>specified in the PCC</strong>.</p><p>39.2.2 Prior to preparing and submitting the &ldquo;Change Proposal,&rdquo; the Contractor shall submit to the Project Manager an &ldquo;Estimate for Change Proposal,&rdquo; which shall be an estimate of the cost of preparing and submitting the Change Proposal.</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Upon receipt of the Contractor&rsquo;s Estimate for Change Proposal, the Employer shall do one of the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; accept the Contractor&rsquo;s estimate with instructions to the Contractor to proceed with the preparation of the Change Proposal</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; advise the Contractor of any part of its Estimate for Change Proposal that is unacceptable and request the Contractor to review its estimate</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; advise the Contractor that the Employer does not intend to proceed with the Change.</p><p>39.2.3 Upon receipt of the Employer&rsquo;s instruction to proceed under GCC Sub-Clause 39.2.2 (a), the Contractor shall, with proper expedition, proceed with the preparation of the Change Proposal, in accordance with GCC Sub-Clause 39.2.1.</p><p>39.2.4 The pricing of any Change shall, as far as practicable, be calculated in accordance with the rates and prices included in the Contract.&nbsp; If such rates and prices are inequitable, the Parties thereto shall agree on specific rates for the valuation of the Change.</p><p>39.2.5 If before or during the preparation of the Change Proposal it becomes apparent that the aggregate effect of compliance therewith and with all other Change Orders that have already become binding upon the Contractor under this GCC Clause 39 would be to increase or decrease the Contract Price as originally set forth in Article 2 (Contract Price) of the Contract Agreement by more than fifteen percent (15%), the Contractor may give a written notice of objection thereto prior to furnishing the Change Proposal as aforesaid.&nbsp; If the Employer accepts the Contractor&rsquo;s objection, the Employer shall withdraw the proposed Change and shall notify the Contractor in writing thereof.</p><p>The Contractor&rsquo;s failure to so object shall neither affect its right to object to any subsequent requested Changes or Change Orders herein, nor affect its right to take into account, when making such subsequent objection, the percentage increase or decrease in the Contract Price that any Change not objected to by the Contractor represents.</p><p>39.2.6 Upon receipt of the Change Proposal, the Employer and the Contractor shall mutually agree upon all matters therein contained.&nbsp; Within fourteen (14) days after such agreement, the Employer shall, if it intends to proceed with the Change, issue the Contractor with a Change Order.</p><p>If the Employer is unable to reach a decision within fourteen (14) days, it shall notify the Contractor with details of when the Contractor can expect a decision.</p><p>If the Employer decides not to proceed with the Change for whatever reason, it shall, within the said period of fourteen (14) days, notify the Contractor accordingly.&nbsp; Under such circumstances, the Contractor shall be entitled to reimbursement of all costs reasonably incurred by it in the preparation of the Change Proposal, provided that these do not exceed the amount given by the Contractor in its Estimate for Change Proposal submitted in accordance with GCC Sub-Clause 39.2.2.</p><p>39.2.7 If the Employer and the Contractor cannot reach agreement on the price for the Change, an equitable adjustment to the Time for Completion, or any other matters identified in the Change Proposal, the Employer may nevertheless instruct the Contractor to proceed with the Change by issue of a &ldquo;Pending Agreement Change Order.&rdquo;</p><p>Upon receipt of a Pending Agreement Change Order, the Contractor shall immediately proceed with effecting the Changes covered by such Order.&nbsp; The Parties shall thereafter attempt to reach agreement on the outstanding issues under the Change Proposal.</p><p>If the Parties cannot reach agreement within sixty (60) days from the date of issue of the Pending Agreement Change Order, then the matter may be referred to the Dispute Board in accordance with the provisions of GCC Sub-Clause 46.1.</p><p>39.3&nbsp;&nbsp; <u>Changes Originating from Contractor</u></p><p>39.3.1 If the Contractor proposes a Change pursuant to GCC Sub-Clause 39.1.2, the Contractor shall submit to the Project Manager a written &ldquo;Application for Change Proposal,&rdquo; giving reasons for the proposed Change and including the information specified in GCC Sub-Clause 39.1.2.</p><p>Upon receipt of the Application for Change Proposal, the Parties shall follow the procedures outlined in GCC Sub-Clauses 39.2.6 and 39.2.7.&nbsp; However, the Contractor shall not be entitled to recover the costs of preparing the Application for Change Proposal.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>40.&nbsp; Extension of Time for Completion</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>40.1&nbsp;&nbsp; The Time(s) for Completion specified in the PCC pursuant to GCC Sub-Clause 8.2 shall be extended if the Contractor is delayed or impeded in the performance of any of its obligations under the Contract by reason of any of the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any Change in the Facilities as provided in GCC Clause 39</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any occurrence of Force Majeure as provided in GCC Clause 37, unforeseen conditions as provided in GCC Clause 35, or other occurrence of any of the matters specified or referred to in paragraphs (a), (b) and (c) of GCC Sub-Clause 32.2</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any suspension order given by the Employer under GCC Clause 41 hereof or reduction in the rate of progress pursuant to GCC Sub-Clause 41.2 or</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any changes in laws and regulations as provided in GCC Clause 36 or</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; any default or breach of the Contract by the Employer, Appendix to the Contract Agreement titled ,or any activity, act or omission of the Employer, or the Project Manager, or any other contractors employed by the Employer, or</p><ol><li>any delay on the part of a Subcontractor, provided such delay is due to a cause for which the Contractor himself would have been entitled to an extension of time under this sub-clause, or</li><li>delays attributable to the Employer or caused by customs, or</li><li>any other matter specifically mentioned in the Contract</li></ol><p>by such period as shall be fair and reasonable in all the circumstances and as shall fairly reflect the delay or impediment sustained by the Contractor.</p><p>40.2&nbsp;&nbsp; Except where otherwise specifically provided in the Contract, the Contractor shall submit to the Project Manager a notice of a claim for an extension of the Time for Completion, together with particulars of the event or circumstance justifying such extension as soon as reasonably practicable after the commencement of such event or circumstance.&nbsp; As soon as reasonably practicable after receipt of such notice and supporting particulars of the claim, the Employer and the Contractor shall agree upon the period of such extension.&nbsp; In the event that the Contractor does not accept the Employer&rsquo;s estimate of a fair and reasonable time extension, the Contractor shall be entitled to refer the matter to a Dispute Board, pursuant to GCC Sub-Clause 46.1.</p><p>40.3 The Contractor shall at all times use its reasonable efforts to minimize any delay in the performance of its obligations under the Contract.</p><p>40.4&nbsp; In all cases where the Contractor has given a notice of a claim for an extension of time under GCC 40.2, the Contractor shall consult with the Project Manager in order to determine the steps (if any) which can be taken to overcome or minimize the actual or anticipated delay. The Contractor shall there after comply with all reasonable instructions which the Project Manager shall give in order to minimize such delay. If compliance with such instructions shall cause the Contractor to incur extra costs and the Contractor is entitled to an extension of time under GCC 40.1, the amount of such extra costs shall be added to the Contract Price.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>41.&nbsp; Suspension</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>41.1&nbsp;&nbsp; The Employer may request the Project Manager, by notice to the Contractor, to order the Contractor to suspend performance of any or all of its obligations under the Contract.&nbsp; Such notice shall specify the obligation of which performance is to be suspended, the effective date of the suspension and the reasons therefor.&nbsp; The Contractor shall thereupon suspend performance of such obligation, except those obligations necessary for the care or preservation of the Facilities, until ordered in writing to resume such performance by the Project Manager.</p><p>If, by virtue of a suspension order given by the Project Manager, other than by reason of the Contractor&rsquo;s default or breach of the Contract, the Contractor&rsquo;s performance of any of its obligations is suspended for an aggregate period of more than ninety (90) days, then at any time thereafter and provided that at that time such performance is still suspended, the Contractor may give a notice to the Project Manager requiring that the Employer shall, within twenty-eight (28) days of receipt of the notice, order the resumption of such performance or request and subsequently order a change in accordance with GCC Clause 39, excluding the performance of the suspended obligations from the Contract.</p><p>If the Employer fails to do so within such period, the Contractor may, by a further notice to the Project Manager, elect to treat the suspension, where it affects a part only of the Facilities, as a deletion of such part in accordance with GCC Clause 39 or, where it affects the whole of the Facilities, as termination of the Contract under GCC Sub-Clause 42.1.</p><p>41.2&nbsp;&nbsp; If</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Employer has failed to pay the Contractor any sum due under the Contract within the specified period, has failed to approve any invoice or supporting documents without just cause pursuant to the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, or commits a substantial breach of the Contract, the Contractor may give a notice to the Employer that requires payment of such sum, with interest thereon as stipulated in GCC Sub-Clause 12.3, requires approval of such invoice or supporting documents, or specifies the breach and requires the Employer to remedy the same, as the case may be.&nbsp; If the Employer fails to pay such sum together with such interest, fails to approve such invoice or supporting documents or give its reasons for withholding such approval, or fails to remedy the breach or take steps to remedy the breach within fourteen (14) days after receipt of the Contractor&rsquo;s notice or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the Contractor is unable to carry out any of its obligations under the Contract for any reason attributable to the Employer, including but not limited to the Employer&rsquo;s failure to provide possession of or access to the Site or other areas in accordance with GCC Sub-Clause 10.2, or failure to obtain any governmental permit necessary for the execution and/or completion of the Facilities,</p><p>then the Contractor may by fourteen (14) days&rsquo; notice to the Employer suspend performance of all or any of its obligations under the Contract, or reduce the rate of progress.</p><p>41.3&nbsp;&nbsp; If the Contractor&rsquo;s performance of its obligations is suspended or the rate of progress is reduced pursuant to this GCC Clause 41, then the Time for Completion shall be extended in accordance with GCC Sub-Clause 40.1, and any and all additional costs or expenses incurred by the Contractor as a result of such suspension or reduction shall be paid by the Employer to the Contractor in addition to the Contract Price, except in the case of suspension order or reduction in the rate of progress by reason of the Contractor&rsquo;s default or breach of the Contract.</p><p>41.4&nbsp;&nbsp; During the period of suspension, the Contractor shall not remove from the Site any Plant, any part of the Facilities or any Contractor&rsquo;s Equipment, without the prior written consent of the Employer.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>42.&nbsp; Termination</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>42.1&nbsp;&nbsp; <u>Termination for Employer&rsquo;s Convenience</u></p><p>42.1.1 The Employer may at any time terminate the Contract for any reason by giving the Contractor a notice of termination that refers to this GCC Sub-Clause 42.1.</p><p>42.1.2 Upon receipt of the notice of termination under GCC Sub-Clause 42.1.1, the Contractor shall either immediately or upon the date specified in the notice of termination</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as the Employer may specify in the notice of termination for the sole purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) (ii) below</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; remove all Contractor&rsquo;s Equipment from the Site, repatriate the Contractor&rsquo;s Personnel from the Site, remove from the Site any wreckage, rubbish and debris of any kind, and leave the whole of the Site in a clean and safe condition, and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; subject to the payment specified in GCC Sub-Clause 42.1.3,</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(ii)&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors; and</p><p>(iii)&nbsp;&nbsp; deliver to the Employer all non-proprietary drawings, specifications and other documents prepared by the Contractor or its Subcontractors as at the date of termination in connection with the Facilities.</p><p>42.1.3 In the event of termination of the Contract under GCC Sub-Clause 42.1.1, the Employer shall pay to the Contractor the following amounts:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Contract Price, properly attributable to the parts of the Facilities executed by the Contractor as of the date of termination</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the costs reasonably incurred by the Contractor in the removal of the Contractor&rsquo;s Equipment from the Site and in the repatriation of the Contractor&rsquo;s Personnel</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any amounts to be paid by the Contractor to its Subcontractors in connection with the termination of any subcontracts, including any cancellation charges</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; costs incurred by the Contractor in protecting the Facilities and leaving the Site in a clean and safe condition pursuant to paragraph (a) of GCC Sub-Clause 42.1.2</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; the cost of satisfying all other obligations, commitments and claims that the Contractor may in good faith have undertaken with third Parties in connection with the Contract and that are not covered by paragraphs (a) through (d) above.</p><p>42.2&nbsp;&nbsp; <u>Termination for Contractor&rsquo;s Default</u></p><p>42.2.1 The Employer, without prejudice to any other rights or remedies it may possess, may terminate the Contract forthwith in the following circumstances by giving a notice of termination and its reasons therefor to the Contractor, referring to this GCC Sub-Clause 42.2:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor becomes bankrupt or insolvent, has a receiving order issued against it, compounds with its creditors, or, if the Contractor is a corporation, a resolution is passed or order is made for its winding up, other than a voluntary liquidation for the purposes of amalgamation or reconstruction, a receiver is appointed over any part of its undertaking or assets, or if the Contractor takes or suffers any other analogous action in consequence of debt</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor assigns or transfers the Contract or any right or interest therein in violation of the provision of GCC Clause 43.</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor, in the judgment of the Employer has engaged in Fraud and Corruption, as defined in&nbsp;&nbsp; paragrpah 2.2 a. of Appendix B to the GCC, in competing for or in executing the Contract.</p><p>42.2.2 If the Contractor</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; has abandoned or repudiated the Contract</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; has without valid reason failed to commence work on the Facilities promptly or has suspended, other than pursuant to GCC Sub-Clause 41.2, the progress of Contract performance for more than twenty-eight (28) days after receiving a written instruction from the Employer to proceed</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; persistently fails to execute the Contract in accordance with the Contract or persistently neglects to carry out its obligations under the Contract without just cause</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; refuses or is unable to provide sufficient materials, services or labor to execute and complete the Facilities in the manner specified in the program furnished under GCC Sub-Clause 18.2&nbsp; at rates of progress that give reasonable assurance to the Employer that the Contractor can attain Completion of the Facilities by the Time for Completion as extended,</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; then the Employer may, without prejudice to any other rights it may possess under the Contract, give a notice to the Contractor stating the nature of the default and requiring the Contractor to remedy the same.&nbsp; If the Contractor fails to remedy or to take steps to remedy the same within fourteen (14) days of its receipt of such notice, then the Employer may terminate the Contract forthwith by giving a notice of termination to the Contractor that refers to this GCC Sub-Clause 42.2.</p><p>42.2.3 Upon receipt of the notice of termination under GCC Sub-Clauses 42.2.1 or 42.2.2, the Contractor shall, either immediately or upon such date as is specified in the notice of termination,</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as the Employer may specify in the notice of termination for the sole purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) below</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the&nbsp; Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer all drawings, specifications and other documents prepared by the Contractor or its Subcontractors as of the date of termination in connection with the Facilities.</p><p>42.2.4 The Employer may enter upon the Site, expel the Contractor, and complete the Facilities itself or by employing any third Party.&nbsp; The Employer may, to the exclusion of any right of the Contractor over the same, take over and use with the payment of a fair rental rate to the Contractor, with all the maintenance costs to the account of the Employer and with an indemnification by the Employer for all liability including damage or injury to persons arising out of the Employer&rsquo;s use of such equipment, any Contractor&rsquo;s Equipment owned by the Contractor and on the Site in connection with the Facilities for such reasonable period as the Employer considers expedient for the supply and installation of the Facilities.</p><p>Upon completion of the Facilities or at such earlier date as the Employer thinks appropriate, the Employer shall give notice to the Contractor that such Contractor&rsquo;s Equipment will be returned to the Contractor at or near the Site and shall return such Contractor&rsquo;s Equipment to the Contractor in accordance with such notice.&nbsp; The Contractor shall thereafter without delay and at its cost remove or arrange removal of the same from the Site.</p><p>42.2.5 Subject to GCC Sub-Clause 42.2.6, the Contractor shall be entitled to be paid the Contract Price attributable to the Facilities executed as of the date of termination, the value of any unused or partially used Plant on the Site, and the costs, if any, incurred in protecting the Facilities and in leaving the Site in a clean and safe condition pursuant to paragraph (a) of GCC Sub-Clause 42.2.3.&nbsp; Any sums due the Employer from the Contractor accruing prior to the date of termination shall be deducted from the amount to be paid to the Contractor under this Contract.</p><p>42.2.6 If the Employer completes the Facilities, the cost of completing the Facilities by the Employer shall be determined.</p><p>If the sum that the Contractor is entitled to be paid, pursuant to GCC Sub-Clause 42.2.5, plus the reasonable costs incurred by the Employer in completing the Facilities, exceeds the Contract Price, the Contractor shall be liable for such excess.</p><p>If such excess is greater than the sums due the Contractor under GCC Sub-Clause 42.2.5, the Contractor shall pay the balance to the Employer, and if such excess is less than the sums due the Contractor under GCC Sub-Clause 42.2.5, the Employer shall pay the balance to the Contractor.</p><p>The Employer and the Contractor shall agree, in writing, on the computation described above and the manner in which any sums shall be paid.</p><p>42.3&nbsp;&nbsp; <u>Termination by the Contractor</u></p><p>42.3.1 If</p><p>(a)&nbsp;&nbsp;&nbsp; the Employer has failed to pay the Contractor any sum due under the Contract within the specified period, has failed to approve any invoice or supporting documents without just cause pursuant to the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, or commits a substantial breach of the Contract, the Contractor may give a notice to the Employer that requires payment of such sum, with interest thereon as stipulated in GCC Sub-Clause 12.3, requires approval of such invoice or supporting documents, or specifies the breach and requires the Employer to remedy the same, as the case may be.&nbsp; If the Employer fails to pay such sum together with such interest, fails to approve such invoice or supporting documents or give its reasons for withholding such approval, fails to remedy the breach or take steps to remedy the breach within fourteen (14) days after receipt of the Contractor&rsquo;s notice, or</p><p>(b)&nbsp;&nbsp;&nbsp; the Contractor is unable to carry out any of its obligations under the Contract for any reason attributable to the Employer, including but not limited to the Employer&rsquo;s failure to provide possession of or access to the Site or other areas or failure to obtain any governmental permit necessary for the execution and/or completion of the Facilities,</p><p>then the Contractor may give a notice to the Employer thereof, and if the Employer has failed to pay the outstanding sum, to approve the invoice or supporting documents, to give its reasons for withholding such approval, or to remedy the breach within twenty-eight (28) days of such notice, or if the Contractor is still unable to carry out any of its obligations under the Contract for any reason attributable to the Employer within twenty-eight (28) days of the said notice, the Contractor may by a further notice to the Employer referring to this GCC Sub-Clause 42.3.1, forthwith terminate the Contract.</p><p>42.3.2 The Contractor may terminate the Contract forthwith by giving a notice to the Employer to that effect, referring to this GCC Sub-Clause 42.3.2, if the Employer becomes bankrupt or insolvent, has a receiving order issued against it, compounds with its creditors, or, being a corporation, if a resolution is passed or order is made for its winding up (other than a voluntary liquidation for the purposes of amalgamation or reconstruction), a receiver is appointed over any part of its undertaking or assets, or if the Employer takes or suffers any other analogous action in consequence of debt.</p><p>42.3.3 If the Contract is terminated under GCC Sub-Clauses 42.3.1 or 42.3.2, then the Contractor shall immediately</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as may be necessary for the purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) (ii)</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; remove all Contractor&rsquo;s Equipment from the Site and repatriate the Contractor&rsquo;s Personnel from the Site, and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; subject to the payment specified in GCC Sub-Clause 42.3.4,</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(ii)&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors, and</p><p>(iii)&nbsp;&nbsp; deliver to the Employer all drawings, specifications and other documents prepared by the Contractor or its Subcontractors as of the date of termination in connection with the Facilities.</p><p>42.3.4 If the Contract is terminated under GCC Sub-Clauses 42.3.1 or 42.3.2, the Employer shall pay to the Contractor all payments specified in GCC Sub-Clause 42.1.3, and reasonable compensation for all loss, except for loss of profit, or damage sustained by the Contractor arising out of, in connection with or in consequence of such termination.</p><p>42.3.5 Termination by the Contractor pursuant to this GCC Sub-Clause 42.3 is without prejudice to any other rights or remedies of the Contractor that may be exercised in lieu of or in addition to rights conferred by GCC Sub-Clause 42.3.</p><p>42.4&nbsp;&nbsp; In this GCC Clause 42, the expression &ldquo;Facilities executed&rdquo; shall include all work executed, Installation Services provided, and all Plant acquired, or subject to a legally binding obligation to purchase, by the Contractor and used or intended to be used for the purpose of the Facilities, up to and including the date of termination.</p><p>42.5&nbsp;&nbsp; In this GCC Clause 42, in calculating any monies due from the Employer to the Contractor, account shall be taken of any sum previously paid by the Employer to the Contractor under the Contract, including any advance payment paid pursuant to the Appendix to the Contract Agreement titled Terms and Procedures of Payment.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>43.&nbsp; Assignment</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>43.1&nbsp;&nbsp; Neither the Employer nor the Contractor shall, without the express prior written consent of the other Party, which consent shall not be unreasonably withheld, assign to any third Party the Contract or any part thereof, or any right, benefit, obligation or interest therein or thereunder, except that the Contractor shall be entitled to assign either absolutely or by way of charge any monies due and payable to it or that may become due and payable to it under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>44. Export Restrictions</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>44.1&nbsp;&nbsp; Notwithstanding any obligation under the Contract to complete all export formalities, any export restrictions attributable to the Employer, to the country of the Employer or to the use of the Plant and Installation Services to be supplied which arise from trade regulations from a country supplying those Plant and Installation Services, and which substantially impede the Contractor from meeting its obligations under the Contract, shall release the Contractor from the obligation to provide deliveries or services, always provided, however, that the Contractor can demonstrate to the satisfaction of the Employer and of the Bank that it has completed all formalities in a timely manner, including applying for permits, authorizations and licenses necessary for the export of the Plant and Installation Services under the terms of the Contract.&nbsp; Termination of the Contract on this basis shall be for the Employer&rsquo;s convenience pursuant to Sub-Clause 42.1.</p></td></tr></tbody></table><ol><li><strong>Claims, Disputes and Arbitration</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:617px\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>45.&nbsp; Contractor&rsquo;s Claims</strong></p></td><td style=\"vertical-align:top; width:473px\"><p>45.1&nbsp;&nbsp; If the Contractor considers himself to be entitled to any extension of the Time for Completion and/or any additional payment, under any Clause of these Conditions or otherwise in connection with the Contract, the Contractor shall submit a notice to the Project Manager, describing the event or circumstance giving rise to the claim. The notice shall be given as soon as practicable, and not later than 28 days after the Contractor became aware, or should have become aware, of the event or circumstance.</p><p>If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim. Otherwise, the following provisions of this Sub-Clause shall apply.</p><p>The Contractor shall also submit any other notices which are required by the Contract, and supporting particulars for the claim, all as relevant to such event or circumstance.</p><p>The Contractor shall keep such contemporary records as may be necessary to substantiate any claim, either on the Site or at another location acceptable to the Project Manager. Without admitting the Employer&rsquo;s liability, the Project Manager may, after receiving any notice under this Sub-Clause, monitor the record-keeping and/or instruct the Contractor to keep further contemporary records. The Contractor shall permit the Project Manager to inspect all these records, and shall (if instructed) submit copies to the Project Manager.</p><p>Within 42 days after the Contractor became aware (or should have become aware) of the event or circumstance giving rise to the claim, or within such other period as may be proposed by the Contractor and approved by the Project Manager, the Contractor shall send to the Project Manager a fully detailed claim which includes full supporting particulars of the basis of the claim and of the extension of time and/or additional payment claimed. If the event or circumstance giving rise to the claim has a continuing effect:</p><ol><li>this fully detailed claim shall be considered as interim;</li><li>the Contractor shall send further interim claims at monthly intervals, giving the accumulated delay and/or amount claimed, and such further particulars as the Project Manager may reasonably require; and</li><li>the Contractor shall send a final claim within 28 days after the end of the effects resulting from the event or circumstance, or within such other period as may be proposed by the Contractor and approved by the Project Manager.</li></ol><p>Within 42 days after receiving a claim or any further particulars supporting a previous claim, or within such other period as may be proposed by the Project Manager and approved by the Contractor, the Project Manager shall respond with approval, or with disapproval and detailed comments. He may also request any necessary further particulars, but shall nevertheless give his response on the principles of the claim within such time.</p><p>Each Payment Certificate shall include such amounts for any claim as have been reasonably substantiated as due under the relevant provision of the Contract. Unless and until the particulars supplied are sufficient to substantiate the whole of the claim, the Contractor shall only be entitled to payment for such part of the claim as he has been able to substantiate.</p><p>The Project Manager shall agree with the Contractor or estimate: (i) the extension (if any) of the Time for Completion (before or after its expiry) in accordance with GCC Clause 40, and/or (ii) the additional payment (if any) to which the Contractor is entitled under the Contract.</p><p>The requirements of this Sub-Clause are in addition to those of any other Sub-Clause which may apply to a claim. If the Contractor fails to comply with this or another Sub-Clause in relation to any claim, any extension of time and/or additional payment shall take account of the extent (if any) to which the failure has prevented or prejudiced proper investigation of the claim, unless the claim is excluded under the second paragraph of this Sub-Clause.</p><p>In the event that the Contractor and the Employer cannot agree on any matter relating to a claim, either Party may refer the matter to the Dispute Board pursuant to GCC 46 hereof.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>46. Disputes and Arbitration</strong></p></td><td style=\"vertical-align:top; width:473px\"><p>46.1 &nbsp; Appointment of the Dispute Board</p><p>Disputes shall be referred to a DB for decision in accordance with GCC Sub-Clause 46.3. The Parties shall appoint a DB by the date stated in the PCC.</p><p>The DB shall comprise, as stated in the PCC, either one or three suitably qualified persons (&ldquo;the members&rdquo;), each of whom shall meet the criteria set forth in Sub-Clause 3 of Appendix A- General Conditions of Dispute Board Agreement. If the number is not so stated and the Parties do not agree otherwise, the DB shall comprise three persons, one of whom shall serve as chairman.</p><p>If the Contract is with a foreign Contractor, the DB members shall not have the same nationality as the Employer or the Contractor.</p><p>If the Parties have not jointly appointed the DB 21 days before the date stated in the PCC and the DB is to comprise three persons, each Party shall nominate one member for the approval of the other Party. The first two members shall recommend and the Parties shall agree upon the third member, who shall act as chairman.</p><p>However, if a list of potential members is included in the PCC, the members shall be selected from those on the list, other than anyone who is unable or unwilling to accept appointment to the DB.</p><p>The agreement between the Parties and either the sole member or each of the three members shall incorporate by reference the General Conditions of Dispute Board Agreement contained in the Appendix to these General Conditions, with such amendments as are agreed between them.</p><p>The DB shall be deemed to be constituted on the date the Parties and the sole member or the three members (as the case may be) of the DB have all signed a DB agreement.</p><p>The terms of the remuneration of either the sole member or each of the three members, including the remuneration of any expert whom the DB consults, shall be mutually agreed upon by the Parties when agreeing the terms of appointment of the member or such expert (as the case may be). Each Party shall be responsible for paying one-half of this remuneration.</p><p>If a member declines to act or is unable to act as a result of death, disability, resignation or termination of appointment, a replacement shall be appointed in the same manner as the replaced person was required to have been nominated or agreed upon, as described in this Sub-Clause.</p><p>The appointment of any member may be terminated by mutual agreement of both Parties, but not by the Employer or the Contractor acting alone. Unless otherwise agreed by both Parties, the appointment of the DB (including each member) shall expire when the Operational Acceptance Certificate has been issued in accordance with GCC Sub-Clause 25.3.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.2&nbsp;&nbsp; Failure to Agree on the Composition of the Dispute Board</p><p>If any of the following conditions apply, namely:</p><ol><li>the Parties fail to agree upon the appointment of the sole member of the DB by the date stated in the first paragraph of GCC Sub-Clause 46.1,</li><li>either Party fails to nominate a member (for approval by the other Party) of a DB of three persons by such date,</li><li>the Parties fail to agree upon the appointment of the third member (to act as chairman) of the DB by such date, or</li><li>the Parties fail to agree upon the appointment of a replacement person within 42 days after the date on which the sole member or one of the three members declines to act or is unable to act as a result of death, disability, resignation or termination of appointment,</li></ol><p>then the appointing entity or official <strong>named in the PCC</strong> shall, upon the request of either or both of the Parties and after due consultation with both Parties, appoint this member of the DB. This appointment shall be final and conclusive. Each Party shall be responsible for paying one-half of the remuneration of the appointing entity or official.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.3&nbsp;&nbsp; Obtaining Dispute Board&rsquo;s Decision</p><p>If a dispute (of any kind whatsoever) arises between the Parties in connection with the performance of the Contract, including any dispute as to any certificate, determination, instruction, opinion or valuation of the Project Manager, either Party may refer the dispute in writing to the DB for its decision, with copies to the other Party and the Project Manager. Such reference shall state that it is given under this Sub-Clause.</p><p>For a DB of three persons, the DB shall be deemed to have received such reference on the date when it is received by the chairman of the DB.</p><p>Both Parties shall promptly make available to the DB all such additional information, further access to the Site, and appropriate facilities, as the DB may require for the purposes of making a decision on such dispute. The DB shall be deemed to be not acting as arbitrator(s).</p><p>Within 84 days after receiving such reference, or within such other period as may be proposed by the DB and approved by both Parties, the DB shall give its decision, which shall be reasoned and shall state that it is given under this Sub-Clause. The decision shall be binding on both Parties, who shall promptly give effect to it unless and until it shall be revised in an amicable settlement or an arbitral award as described below. Unless the Contract has already been abandoned, repudiated or terminated, the Contractor shall continue with the performance of the Facilities in accordance with the Contract.</p><p>If either Party is dissatisfied with the DB&rsquo;s decision, then either Party may, within 28 days after receiving the decision, give notice to the other Party of its dissatisfaction and intention to commence arbitration. If the DB fails to give its decision within the period of 84 days (or as otherwise approved) after receiving such reference, then either Party may, within 28 days after this period has expired, give notice to the other Party of its dissatisfaction and intention to commence arbitration.</p><p>In either event, this notice of dissatisfaction shall state that it is given under this Sub-Clause, and shall set out the matter in dispute and the reason(s) for dissatisfaction. Except as stated in GCC Sub-Clauses 46.6 and 46.7, neither Party shall be entitled to commence arbitration of a dispute unless a notice of dissatisfaction has been given in accordance with this Sub-Clause.</p><p>If the DB has given its decision as to a matter in dispute to both Parties, and no notice of dissatisfaction has been given by either Party within 28 days after it received the DB&rsquo;s decision, then the decision shall become final and binding upon both Parties.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.4&nbsp;&nbsp; Amicable Settlement</p><p>Where notice of dissatisfaction has been given under GCC Sub-Clause 46.3 above, both Parties shall attempt to settle the dispute amicably before the commencement of arbitration. However, unless both Parties agree otherwise, arbitration may be commenced on or after the fifty-sixth day after the day on which notice of dissatisfaction and intention to commence arbitration was given, even if no attempt at amicable settlement has been made.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.5&nbsp;&nbsp; Arbitration</p><p>Unless <strong>indicated otherwise in the PCC,</strong> any dispute not settled amicably and in respect of which the DB&rsquo;s decision (if any) has not become final and binding shall be finally settled by arbitration. Unless otherwise agreed by both Parties, arbitration shall be conducted as follows:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; For contracts with foreign contractors:</p><p><strong>unless otherwise specified in the PCC</strong>; the dispute shall be finally settled under the Rules of Arbitration of the International Chamber of Commerce; by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be the neutral location <strong>stated in the PCC</strong>; and the arbitration shall be conducted in the ruling language <strong>stated in the PCC</strong>;</p><p>and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; For contracts with domestic contractors, arbitration with proceedings conducted in accordance with the laws of the Employer&rsquo;s Country.</p><p>The arbitrator(s) shall have full power to open up, review and revise any certificate, determination, instruction, opinion or valuation of the Project Manager, and any decision of the DB, relevant to the dispute. Nothing shall disqualify the Project Manager from being called as a witness and giving evidence before the arbitrator(s) on any matter whatsoever relevant to the dispute.</p><p>Neither Party shall be limited in the proceedings before the arbitrator(s) to the evidence or arguments previously put before the DB to obtain its decision, or to the reasons for dissatisfaction given in its notice of dissatisfaction. Any decision of the DB shall be admissible in evidence in the arbitration.</p><p>Arbitration may be commenced prior to or after completion of the Facilities. The obligations of the Parties, the Project Manager and the DB shall not be altered by reason of any arbitration being conducted during the progress of the execution of the Facilities.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.6&nbsp;&nbsp; Failure to Comply with Dispute Board&rsquo;s Decision</p><p>In the event that a Party fails to comply with a DB decision which has become final and binding, then the other Party may, without prejudice to any other rights it may have, refer the failure itself to arbitration under GCC Sub-Clause 46.5. GCC Sub-Clauses 46.3 and 46.4 shall not apply to this reference.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.7&nbsp;&nbsp; Expiry of Dispute Board&rsquo;s Appointment</p><p>If a dispute arises between the Parties in connection with the performance of the Contract, and there is no DB in place, whether by reason of the expiry of the DB&rsquo;s appointment or otherwise:</p><p>(a) &nbsp;&nbsp;&nbsp; GCC Sub-Clauses 46.3 and 46.4 shall not apply, and</p><p>(b) &nbsp;&nbsp;&nbsp; the dispute may be referred directly to arbitration under GCC Sub-Clause 46.5</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>47. Cyber Security </strong></p><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>47.1&nbsp;&nbsp; Pursuant to the PCC, the Contractor including its Subcontractors/ suppliers/ manufacturers shall take all technical and organizational measures necessary to protect the information technology systems and data used in connection with the Contract. Without limiting the foregoing, the Contractor, including its Subcontractors/ suppliers/ manufacturers, shall use all reasonable efforts to establish, maintain, implement and comply with, reasonable information technology, information security, cyber security and data protection controls, policies and procedures, including oversight, access controls, encryption, technological and physical safeguards and business continuity/disaster recovery and security plans that are designed to protect against and prevent breach, destruction, loss, unauthorized distribution, use, access, disablement, misappropriation or modification, or other compromise or misuse of or relating to any information technology system or data used in connection with the Contract.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX </strong><strong>A</strong></p><p><strong>General Conditions of Dispute Board Agreement</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions</p><p>Each &ldquo;Dispute Board Agreement&rdquo; is a tripartite agreement by and between:</p><p>the &ldquo;Employer&rdquo;;</p><p>the &ldquo;Contractor&rdquo;; and</p><p>the &ldquo;Member&rdquo; who is defined in the Dispute Board Agreement as being:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp; the sole member of the &ldquo;DB&rdquo; and, where this is the case, all references to the &ldquo;Other Members&rdquo; do not apply, or</p><p>(ii) &nbsp;&nbsp;&nbsp; one of the three persons who are jointly called the &ldquo;DB&rdquo; (or &ldquo;dispute board&rdquo;) and, where this is the case, the other two persons are called the &ldquo;Other Members&rdquo;.</p><p>The Employer and the Contractor have entered (or intend to enter) into a contract, which is called the &ldquo;Contract&rdquo; and is defined in the Dispute Board Agreement, which incorporates this Appendix. In the Dispute Board Agreement, words and expressions which are not otherwise defined shall have the meanings assigned to them in the Contract.</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Provisions</p><p>Unless otherwise stated in the Dispute Board Agreement, it shall take effect on the latest of the following dates:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Commencement Date defined in the Contract,</p><p>(b)&nbsp; &nbsp;&nbsp; when the Employer, the Contractor and the Member have each signed the Dispute Board Agreement, or</p><p>(c) &nbsp;&nbsp;&nbsp; when the Employer, the Contractor and each of the Other Members (if any) have respectively each signed a dispute board agreement.</p><p>This employment of the Member is a personal appointment. At any time, the Member may give not less than 70 days&rsquo; notice of resignation to the Employer and to the Contractor, and the Dispute Board Agreement shall terminate upon the expiry of this period.</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Warranties</p><p>The Member warrants and agrees that he/she is and shall be impartial and independent of the Employer, the Contractor and the Project Manager. The Member shall promptly disclose, to each of them and to the Other Members (if any), any fact or circumstance which might appear inconsistent with his/her warranty and agreement of impartiality and independence.</p><ol><li>When appointing the Member, the Employer and the Contractor relied upon the Member&rsquo;s representations that he/she is:has at least a bachelor&rsquo;s degree in relevant disciplines such as law, engineering, construction management or contract management;&nbsp;</li><li>has at least ten years of experience in contract administration/management and dispute resolution, out of which at least five years of experience as an arbitrator or adjudicator in construction-related disputes;</li><li>has received formal training as an adjudicator from an internationally recognized organization;&nbsp;</li><li>has experience and/or is knowledgeable in the type of work which the Contractor is to carry out under the Contract;</li><li>has experience in the interpretation of construction and/or engineering contract documents; and</li><li>is fluent in the language for communications defined in GCC Sub-Clause 5.3 (or the language as agreed between the Parties and the DB).</li></ol><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Obligations of the Member</p><p>The Member shall:</p><p>(a) &nbsp;&nbsp;&nbsp; have no interest financial or otherwise in the Employer, the Contractor or the Project Manager, nor any financial interest in the Contract except for payment under the Dispute Board Agreement;</p><p>(b) &nbsp;&nbsp;&nbsp; not previously have been employed as a consultant or otherwise by the Employer, the Contractor or the Project Manager, except in such circumstances as were disclosed in writing to the Employer and the Contractor before they signed the Dispute Board Agreement;</p><p>(c) &nbsp;&nbsp;&nbsp; have disclosed in writing to the Employer, the Contractor and the Other Members (if any), before entering into the Dispute Board Agreement and to his/her best knowledge and recollection, any professional or personal relationships with any director, officer or employee of the Employer, the Contractor or the Project Manager, and any previous involvement in the overall project of which the Contract forms part;</p><p>(d)&nbsp; &nbsp;&nbsp; not, for the duration of the Dispute Board Agreement, be employed as a consultant or otherwise by the Employer, the Contractor or the Project Manager, except as may be agreed in writing by the Employer, the Contractor and the Other Members (if any);</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; comply with the annexed procedural rules and with GCC Sub-Clause 46.3;</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; not give advice to the Employer, the Contractor, the Employer&rsquo;s Personnel or the Contractor&rsquo;s &nbsp;Personnel concerning the conduct of the Contract, other than in accordance with the annexed procedural rules;</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; not while a Member enter into discussions or make any agreement with the Employer, the Contractor or the Project Manager regarding employment by any of them, whether as a consultant or otherwise, after ceasing to act under the Dispute Board Agreement;</p><p>(h)&nbsp;&nbsp;&nbsp;&nbsp; ensure his/her availability for all site visits and hearings as are necessary;</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; become conversant with the Contract and with the progress of the Facilities (and of any other parts of the project of which the Contract forms part) by studying all documents received which shall be maintained in a current working file;</p><p>(j)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; treat the details of the Contract and all the DB&rsquo;s activities and hearings as private and confidential, and not publish or disclose them without the prior written consent of the Employer, the Contractor and the Other Members (if any); and</p><p>(k)&nbsp;&nbsp;&nbsp;&nbsp; be available to give advice and opinions, on any matter relevant to the Contract when requested by both the Employer and the Contractor, subject to the agreement of the Other Members (if any).</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Obligations of the Employer and the Contractor</p><p>The Employer, the Contractor, the Employer&rsquo;s Personnel and the Contractor&rsquo;s Personnel shall not request advice from or consultation with the Member regarding the Contract, otherwise than in the normal course of the DB&rsquo;s activities under the Contract and the Dispute Board Agreement. The Employer and the Contractor shall be responsible for compliance with this provision, by the Employer&rsquo;s Personnel and the Contractor&rsquo;s &nbsp;Personnel respectively.</p><p>The Employer and the Contractor undertake to each other and to the Member that the Member shall not, except as otherwise agreed in writing by the Employer, the Contractor, the Member and the Other Members (if any):</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; be appointed as an arbitrator in any arbitration under the Contract;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; be called as a witness to give evidence concerning any dispute before arbitrator(s) appointed for any arbitration under the Contract; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; be liable for any claims for anything done or omitted in the discharge or purported discharge of the Member&rsquo;s functions, unless the act or omission is shown to have been in bad faith.</p><p>The Employer and the Contractor hereby jointly and severally indemnify and hold the Member harmless against and from claims from which he is relieved from liability under the preceding paragraph.</p><p>Whenever the Employer or the Contractor refers a dispute to the DB under GCC Sub-Clause 46.3, which will require the Member to make a site visit and attend a hearing, the Employer or the Contractor shall provide appropriate security for a sum equivalent to the reasonable expenses to be incurred by the Member. No account shall be taken of any other payments due or paid to the Member.</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payment</p><p>The Member shall be paid as follows, in the currency named in the Dispute Board Agreement:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; a retainer fee per calendar month, which shall be considered as payment in full for:</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; being available on 28 days&rsquo; notice for all site visits and hearings;</p><p>(ii)&nbsp;&nbsp;&nbsp; becoming and remaining conversant with all project developments and maintaining relevant files;</p><p>(iii) &nbsp;&nbsp; all office and overhead expenses including secretarial services, photocopying and office supplies incurred in connection with his duties; and</p><p>(iv) &nbsp;&nbsp; all services performed hereunder except those referred to in sub-paragraphs (b) and (c) of this Clause.</p><p>The retainer fee shall be paid with effect from the last day of the calendar month in which the Dispute Board Agreement becomes effective; until the last day of the calendar month in which the Taking-Over Certificate is issued for the whole of the Facilities.</p><p>With effect from the first day of the calendar month following the month in which Taking-Over Certificate is issued for the whole of the Facilities, the retainer fee shall be reduced by one third This reduced fee shall be paid until the first day of the calendar month in which the Member resigns or the Dispute Board Agreement is otherwise terminated.</p><p>(b) &nbsp;&nbsp;&nbsp; a daily fee which shall be considered as payment in full for:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp; each day or part of a day up to a maximum of two days&rsquo; travel time in each direction for the journey between the Member&rsquo;s home and the site, or another location of a meeting with the Other Members (if any);</p><p>(ii) &nbsp;&nbsp;&nbsp; each working day on site visits, hearings or preparing decisions; and</p><p>(iii) &nbsp;&nbsp; each day spent reading submissions in preparation for a hearing.</p><p>(c)&nbsp; &nbsp;&nbsp; all reasonable expenses including necessary travel expenses (air fare in less than first class, hotel and subsistence and other direct travel expenses) incurred in connection with the Member&rsquo;s duties, as well as the cost of telephone calls, courier charges, faxes and telexes: a receipt shall be required for each item in excess of five percent of the daily fee referred to in sub-paragraph (b) of this Clause;</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any taxes properly levied in the Country on payments made to the Member (unless a national or permanent resident of the Country) under this Clause 6.</p><p>The retainer and daily fees shall be as specified in the Dispute Board Agreement. Unless it specifies otherwise, these fees shall remain fixed for the first 24 calendar months and shall thereafter be adjusted by agreement between the Employer, the Contractor and the Member, at each anniversary of the date on which the Dispute Board Agreement became effective.</p><p>If the Parties fail to agree on the retainer fee or the daily fee the appointing entity or official named in the PCC shall determine the amount of the fees to be used.</p><p>The Member shall submit invoices for payment of the monthly retainer and air fares quarterly in advance. Invoices for other expenses and for daily fees shall be submitted following the conclusion of a site visit or hearing. All invoices shall be accompanied by a brief description of activities performed during the relevant period and shall be addressed to the Contractor.</p><p>The Contractor shall pay each of the Member&rsquo;s invoices in full within 56 calendar days after receiving each invoice and shall apply to the Employer (in the Statements under the Contract) for reimbursement of one-half of the amounts of these invoices. The Employer shall then pay the Contractor in accordance with the Contract.</p><p>If the Contractor fails to pay to the Member the amount to which he/she is entitled under the Dispute Board Agreement, the Employer shall pay the amount due to the Member and any other amount which may be required to maintain the operation of the DB; and without prejudice to the Employer&rsquo;s rights or remedies. In addition to all other rights arising from this default, the Employer shall be entitled to reimbursement of all sums paid in excess of one-half of these payments, plus all costs of recovering these sums and financing charges calculated at the rate specified in accordance with GCC Sub-Clause 12.3.</p><p>If the Member does not receive payment of the amount due within 70 days after submitting a valid invoice, the Member may (i) suspend his/her services (without notice) until the payment is received, and/or (ii) resign his/her appointment by giving notice under Clause 7.</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Termination</p><p>At any time: (i) the Employer and the Contractor may jointly terminate the Dispute Board Agreement by giving 42 days&rsquo; notice to the Member; or (ii) the Member may resign as provided for in Clause 2.</p><p>If the Member fails to comply with the Dispute Board Agreement, the Employer and the Contractor may, without prejudice to their other rights, terminate it by notice to the Member. The notice shall take effect when received by the Member.</p><p>If the Employer or the Contractor fails to comply with the Dispute Board Agreement, the Member may, without prejudice to his other rights, terminate it by notice to the Employer and the Contractor. The notice shall take effect when received by them both.</p><p>Any such notice, resignation and termination shall be final and binding on the Employer, the Contractor and the Member. However, a notice by the Employer or the Contractor, but not by both, shall be of no effect.</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Default of the Member</p><p>If the Member fails to comply with any of his obligations under Clause 4 concerning his impartiality or independence in relation to the Employer or the Contractor, he/she shall not be entitled to any fees or expenses hereunder and shall, without prejudice to their other rights, reimburse each of the Employer and the Contractor for any fees and expenses received by the Member and the Other Members (if any), for proceedings or decisions (if any) of the DB which are rendered void or ineffective by the said failure to comply.</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Disputes</p><p>Any dispute or claim arising out of or in connection with this Dispute Board Agreement, or the breach, termination or invalidity thereof, shall be finally settled by institutional arbitration. If no other arbitration institute is agreed, the arbitration shall be conducted under the Rules of Arbitration of the International Chamber of Commerce by one arbitrator appointed in accordance with these Rules of Arbitration.</p><p>&nbsp;</p><p><strong>Appendix A</strong></p><p><strong>DISPUTE BOARD GUIDELINES</strong></p><p>1. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise agreed by the Employer and the Contractor, the DB shall visit the site at intervals of not more than 140 days, including times of critical construction events, at the request of either the Employer or the Contractor. Unless otherwise agreed by the Employer, the Contractor and the DB, the period between consecutive visits shall not be less than 70 days, except as required to convene a hearing as described below.</p><p>2. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The timing of and agenda for each site visit shall be as agreed jointly by the DB, the Employer and the Contractor, or in the absence of agreement, shall be decided by the DB. The purpose of site visits is to enable the DB to become and remain acquainted with the progress of the execution of the Contract and of any actual or potential problems or claims, and, as far as reasonable, to prevent potential problems or claims from becoming disputes.</p><p>3.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Site visits shall be attended by the Employer, the Contractor and the Project Manager and shall be coordinated by the Employer in co-operation with the Contractor. The Employer shall ensure the provision of appropriate conference facilities and secretarial and copying services. At the conclusion of each site visit and before leaving the site, the DB shall prepare a report on its activities during the visit and shall send copies to the Employer and the Contractor.</p><p>4.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Employer and the Contractor shall furnish to the DB one copy of all documents which the DB may request, including Contract documents, progress reports, variation instructions, certificates and other documents pertinent to the performance of the Contract. All communications between the DB and the Employer or the Contractor shall be copied to the other Party. If the DB comprises three persons, the Employer and the Contractor shall send copies of these requested documents and these communications to each of these persons.</p><p>5.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; If any dispute is referred to the DB in accordance with GCC Sub-Clause 46.3, the DB shall proceed in accordance with GCC Sub-Clause 46.3 and these Guidelines. Subject to the time allowed to give notice of a decision and other relevant factors, the DB shall:</p><p>(a)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; act fairly and impartially as between the Employer and the Contractor, giving each of them a reasonable opportunity of putting his case and responding to the other&rsquo;s case, and</p><p>(b)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; adopt procedures suitable to the dispute, avoiding unnecessary delay or expense.</p><p>6.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The DB may conduct a hearing on the dispute, in which event it will decide on the date and place for the hearing and may request that written documentation and arguments from the Employer and the Contractor be presented to it prior to or at the hearing.</p><p>7. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Except as otherwise agreed in writing by the Employer and the Contractor, the DB shall have power to adopt an inquisitorial procedure, to refuse admission to hearings or audience at hearings to any persons other than representatives of the Employer, the Contractor and the Project Manager, and to proceed in the absence of any Party who the DB is satisfied received notice of the hearing; but shall have discretion to decide whether and to what extent this power may be exercised.</p><p>8.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Employer and the Contractor empower the DB, among other things, to:</p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; establish the procedure to be applied in deciding a dispute,</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon the DB&rsquo;s own jurisdiction, and as to the scope of any dispute referred to it,</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; conduct any hearing as it thinks fit, not being bound by any rules or procedures other than those contained in the Contract and these Guidelines,</p><p>(d) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; take the initiative in ascertaining the facts and matters required for a decision,</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; make use of its own specialist knowledge, if any,</p><p>(f) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon the payment of financing charges in accordance with the Contract,</p><p>(g) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon any provisional relief such as interim or conservatory measures,</p><p>(h) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; open up, review and revise any certificate, decision, determination, instruction, opinion or valuation of the Project Manager, relevant to the dispute, and</p><p>(i)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; appoint, should the DB so consider necessary and the Parties agree, a suitable expert/s &nbsp;(including legal and technical expert(s)) at the cost of the Parties to give advice on a specific matter/s relevant to the dispute.</p><p>9.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The DB shall not express any opinions during any hearing concerning the merits of any arguments advanced by the Parties. Thereafter, the DB shall make and give its decision in accordance with GCC Sub-Clause 46.3, or as otherwise agreed by the Employer and the Contractor in writing. If the DB comprises three persons:</p><p>(a)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; it shall convene in private after a hearing, in order to have discussions and prepare its decision;</p><p>(b)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; it shall endeavor to reach a unanimous decision: if this proves impossible the applicable decision shall be made by a majority of the Members, who may require the minority Member to prepare a written report for submission to the Employer and the Contractor; and</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;if a Member fails to attend a meeting or hearing, or to fulfil any required function, the other two Members may nevertheless proceed to make a decision, unless:</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; either the Employer or the Contractor does not agree that they do so, or</p><p>(ii) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the absent Member is the chairman and he/she instructs the other Members to not make a decision.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX B</strong></p><p>&nbsp;</p><p><strong>Fraud and Corruption</strong></p><p><strong><em>(Text in this Appendix shall not be modified)</em></strong></p><ol><li><strong>Purpose</strong><ol><li>The Bank&rsquo;s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.</li></ol></li><li><strong>Requirements</strong></li></ol><ol><li>The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.</li><li>To this end, the Bank:</li></ol><ol><li>Defines, for the purposes of this provision, the terms set forth below as follows:</li></ol><ol><li>&ldquo;corrupt practice&rdquo; is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;</li><li>&ldquo;fraudulent practice&rdquo; is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;</li><li>&ldquo;collusive practice&rdquo; is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;</li><li>&ldquo;coercive practice&rdquo; is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;</li><li>&ldquo;obstructive practice&rdquo; is:</li></ol><ol><li>deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or</li><li>acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights provided for under paragraph 2.2 e. below.</li></ol><ol><li>Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;</li><li>In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time&nbsp; they knew of the practices;</li><li>Pursuant to the Bank&rsquo;s Anti- Corruption Guidelines and in accordance with the Bank&rsquo;s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[15] (ii) to be a nominated[16] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;</li><li>Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents, personnel, permit the Bank to inspect[17] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX C</strong></p><p><strong>Metrics for Progress Reports- Environmental and Social (ES)</strong></p><p><em>Metrics for regular reporting:</em></p><ol><li><ol><li><ol><li><ol><li><ol><li><em>environmental incidents or non-compliances with contract requirements, including contamination, pollution or damage to ground or water supplies;</em></li><li><em>health and safety incidents, accidents, injuries that require treatment and all fatalities; </em></li><li><em>interactions with regulators:&nbsp; identify agency, dates, subjects, outcomes (report the negative if none);</em></li><li><em>status of all permits and agreements: </em></li></ol></li></ol></li></ol></li></ol></li><li>work permits: number required, number received, actions taken for those not received;</li><li>status of permits and consents:</li></ol><ul><li>list areas with landowner agreements required (camp sites), dates of agreements, dates submitted to the engineer (or equivalent);</li><li>identify major activities undertaken in each area in the reporting period and highlights of environmental and social protection (land clearing, boundary marking, topsoil salvage, traffic management, decommissioning planning, decommissioning implementation);<ol><li><ol><li><ol><li><ol><li><em>health and safety supervision: </em></li></ol></li></ol></li></ol></li></ol></li></ul><ol><li>safety officer: number days worked, number of full inspections &amp; partial inspections, reports to construction/project management;</li><li>number of workers, work hours, metric of PPE use (percentage of workers with full personal protection equipment (PPE), partial, etc.), worker violations observed (by type of violation, PPE or otherwise), warnings given, repeat warnings given, follow-up actions taken (if any);<ol><li><ol><li><ol><li><ol><li><em>worker accommodations:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>number of expats housed in accommodations, number of locals;</li><li>date of last inspection, and highlights of inspection including status of accommodations&rsquo; compliance with national and local law and good practice, including sanitation, space, etc.;</li><li>actions taken to recommend/require improved conditions, or to improve conditions.<ol><li><ol><li><ol><li><ol><li><em>Health services: provider of health services, information and/or training, location of clinic, number of non-safety disease or illness treatments and diagnoses (no names to be provided);</em></li><li><em>gender (for expats and locals separately): number of female workers, percentage of workforce, gender issues raised and dealt with (cross-reference grievances or other sections as needed);</em></li><li><em>training:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>number of new workers, number receiving induction training, dates of induction training;</li><li>number and dates of toolbox talks, number of workers receiving Occupational Health and Safety (OHS), environmental and social training;</li><li>number and dates of communicable diseases (including STDs) sensitization and/or training, no. workers receiving training (in the reporting period and in the past); same questions for gender sensitization, flag person training.</li><li>number and date of SEA prevention and SH sensitization and/or training events, including number of workers receiving training on Code of Conduct for Contractor&rsquo;s Personnel (in the reporting period and in the past), etc.<ol><li><ol><li><ol><li><ol><li><em>environmental and social supervision:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>environmental: days worked, areas inspected and numbers of inspections of each (road section, work camp, accommodations, quarries, borrow areas, spoil areas, swamps, forest crossings, etc.), highlights of activities/findings (including violations of environmental and/or social best practices, actions taken), reports to environmental and/or social specialist/construction/site management;</li><li>social: days worked, number of partial and full site inspections (by area: road section, work camp, accommodations, quarries, borrow areas, spoil areas, clinic, HIV/AIDS center, community centers, etc.), highlights of activities (including violations of environmental and/or social requirements observed, actions taken), reports to environmental and/or social specialist/construction/site management; and</li><li>community liaison person(s): days worked (hours community center open), number of people met, highlights of activities (issues raised, etc.), reports to environmental and/or social specialist /construction/site management.<ol><li><ol><li><ol><li><ol><li><em>Grievances: list new grievances (e.g., number of allegations of SEA and SH) received in the reporting period and number of unresolved past grievances by date received, complainant&rsquo;s age and sex, how received, to whom referred to for action, resolution and date (if completed), data resolution reported to complainant, any required follow-up (Cross-reference other sections as needed):</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>Worker grievances;</li><li>Community grievances<ol><li><ol><li><ol><li><ol><li><em>Traffic, road safety and vehicles/equipment:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>traffic and road safety incidents and accidents involving project vehicles &amp; equipment: provide date, location, damage, cause, follow-up;</li><li>traffic and road safety incidents and accidents involving non-project vehicles or property (also reported under immediate metrics): provide date, location, damage, cause, follow-up;</li><li>overall condition of vehicles/equipment (subjective judgment by environmentalist); non-routine repairs and maintenance needed to improve safety and/or environmental performance (to control smoke, etc.).<ol><li><ol><li><ol><li><ol><li><em>Environmental mitigations and issues (what has been done):</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>erosion control: controls implemented by location, status of water crossings, environmentalist inspections and results, actions taken to resolve issues, emergency repairs needed to control erosion/sedimentation;</li><li>spill clean-ups, if any:&nbsp; material spilled, location, amount, actions taken, material disposal (report all spills that result in water or soil contamination;</li><li>waste management: types and quantities generated and managed, including amount taken offsite (and by whom) or reused/recycled/disposed on-site;</li><li>details of tree plantings and other mitigations required undertaken in the reporting period;<ol><li><ol><li><ol><li><ol><li><em>compliance:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>compliance status for conditions of all relevant consents/permits, for the Work, etc.): statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance;</li><li>compliance status of C-ESMP/ESIP requirements: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>compliance status of SEA and SH prevention and response action plan: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>compliance status of Health and Safety Management Plan re: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>other unresolved issues from previous reporting periods related to environmental and social: continued violations, continued failure of equipment, continued lack of vehicle covers, spills not dealt with, continued compensation or blasting issues, etc.&nbsp; Cross-reference other sections as needed.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX D </strong></p><p><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Performance Declaration for Subcontractors</strong></p><p>&nbsp;</p><p><em>[</em><em>The following table shall be filled in by each subcontractor proposed by the Contractor, that was not named in the Contract]</em></p><p>Subcontractor&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Contract reference <em>[insert contract reference]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages<br />&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p><strong>SEA and/or SH Declaration </strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>We:</p><p>&uml;&nbsp; (a) have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.</p><p>&uml;&nbsp; (b) are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.</p><p>&uml;&nbsp; (c) had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p><strong>[</strong><strong><em>If (c) above is applicable</em></strong><strong>, <em>attach evidence of an arbitral award reversing the findings on the issues underlying the disqualification.]</em></strong></p></td></tr></tbody></table><p>&nbsp;</p><p>Name of the Subcontractor<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name of the person duly authorized to sign on behalf of the Subcontractor<u> _______</u></p><p>Title of the person signing on behalf of the Subcontractor<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________</u></p><p>Signature of the person named above<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________</u></p><p>Date signed ________________________________ day of ___________________, _____</p><p>Countersignature of authorized representative of the Contractor:</p><p>Signature: ________________________________________________________</p><p>Date signed ________________________________ day of ___________________, _____</p><p>&nbsp;</p><p><strong>Section IX - Particular Conditions of Contract</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:600px\"><p>The following Particular Conditions of Contract shall supplement the General Conditions of Contract in Section VIII. Whenever there is a conflict, the provisions herein shall prevail over those in the General Conditions.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Particular Conditions of Contract (PCC)</strong></p><p>The following Particular Conditions (PCC) shall supplement the General Conditions (GCC).&nbsp; Whenever there is a conflict, the provisions herein shall prevail over those in the GCC.&nbsp; The clause number of the PCC is the corresponding clause number of the GCC.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:138px\"><p><strong>PCC 1. Definitions</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p>The Employer is:&nbsp; <strong><em>Eswatini Electricity Company</em></strong></p><p>The Project Manager is: <strong><em>Mr. Senzo Shongwe</em></strong></p><p>The Bank is: <strong><em>World Bank</em></strong></p><p>Country of Origin: all countries and territories as indicated in Section V of the bidding document, Eligible Countries.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 5. Law and Language</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 5.1 &nbsp;&nbsp;&nbsp;&nbsp; The Contract shall be interpreted in accordance with the laws of: <strong>Kingdom of Eswatini</strong></p><p>PCC 5.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The ruling language is: <strong><em>English</em></strong><em> </em></p><p>PCC 5.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The language for communications is: <strong><em>English</em></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 7. Scope of Facilities [Spare Parts] (GCC Clause 7)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 7.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Contractor agrees to supply spare parts for a period of years: <strong>five (5) years</strong></p><p><strong>Addition to PCC 7.3</strong></p><p>The Contractor shall carry sufficient inventories to ensure an ex-stock supply of consumable spares for the Plant. Other spare parts and components shall be supplied as promptly as possible, but at the most within six (6) months of placing the order and opening the letter of credit.&nbsp; In addition, in the event of termination of the production of spare parts, advance notification will be made to the Employer of the pending termination, with sufficient time to permit the Employer to procure the needed requirement.&nbsp; Following such termination, the Contractor will furnish to the extent possible and at no cost to the Employer the blueprints, drawings and specifications of the spare parts, if requested.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 8. Time for Commencement and Completion</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 8.1&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall commence work on the Facilities within <strong>15 (fifteen) calendar days</strong> from the Effective Date for determining Time for Completion as specified in the Contract Agreement.</p><p>PCC 8.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Time for Completion of the whole of the Facilities shall be <strong>Six (6) months </strong>from the Effective Date as described in the Contract Agreement<em>.</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:149px; vertical-align:top; width:138px\"><p><strong>PCC 9. Contractor&rsquo;s Responsibilities</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:149px; vertical-align:top; width:462px\"><p>PCC 9.8&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The following sustainable procurement contractual provisions apply:</p><ul><li>The 11kV auto recloser must utilize vacuum interruption and be insulated with solid dielectrics.</li><li>The use of SF (Sulfur Hexafluoride) gas or insulating oils is strictly prohibited to minimize global warming potential and eliminate hazardous leaks.</li><li>The recloser manufacturing process shall be comply with the standard ISO 9001, Quality Management System.</li><li>The Recloser packaging material shall be recyclable.</li><li>The recloser shall be almost maintenance free throughout its life expectancy.</li></ul></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 11. Contract Price</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 11.2&nbsp;&nbsp;&nbsp; The Contract Price shall be a firm lump sum.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 12. Terms of Payment</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p><em>PCC 12.5&nbsp;&nbsp; </em>An amount equivalent to 2% of the Contract price.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 13. Securities</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 13.3.1 The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: <strong>Ten (10%)</strong> of the Total Contract Price.</p><p>PCC 13.3.2 The Performance Security shall be in the form of the <strong>Bank Guarantee</strong> attached hereto in Section X, Contract Forms.</p><p>The Performance Security shall be issued by any registered &quot;A&quot; class commercial Bank in Kingdom of Eswatini, or a Foreign Bank. If Performance Security will be issued by a Foreign Bank, it shall be counter guaranteed by any registered &quot;A&quot; class commercial Bank in Kingdom of Eswatini. The performance security as required by the clause 13.3.1 above shall be valid for period covering entire contract execution period and any extension thereof plus defect liability period plus three months.</p><p>PCC 13.3.3 The Performance Security shall not be reduced on the date of the Operational Acceptance.</p><p>PCC 13.3.3 The Performance Security shall be reduced to ten percent (10%) of the value of the component covered by the extended defect liability to cover the Contractor&rsquo;s extended defect liability in accordance with the provision in the PCC, pursuant to GCC Sub-Clause 27.10.&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 15. License/Use of Technical Information</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 15.2 <strong>Add the following as second paragraph:</strong></p><p>The Employer shall have the right to reproduce any or all drawings, documents and other materials furnished to the Employer for the purpose of the Contract and in addition, if required, for operation and maintenance.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 18. Progress Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p><em>PCC 18.3&nbsp;&nbsp; </em>Progress reports shall include status of compliance to cyber security risks management, and any foreseeable cyber security risk and mitigation.</p><p>Potential and occurred cyber security incidents are to be immediately reported</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 21. Procurement</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 21.3.2 <strong>Add the following to the clause:</strong></p><p>The Employer shall in no way be responsible for the condition of road and access.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 22 Installation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC22.2.5 Working Hours</p><p>Normal working hours are: 0800hrs to 1700hrs (Monday to Friday)</p><p>PCC 22.2.8 Funeral Arrangements: as specified in the GCC.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 23. Tests and Inspection</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 23.2 <strong>Supplement GCC 23.2 with the following:</strong></p><p>For tests / inspections and training, the Contractor will arrange and pay for the visa fee, accommodation in the international and local travel of two (02) representatives of the employer i.e. - air tickets; local transport; accommodation.</p><p>PCC 23.3 <strong>Supplement GCC 23.3 with the following:</strong></p><p>The Contractor shall furnish the Project Manager with the details of the program of the tests and/or inspection and of the place and time thereof at least two (2) weeks in advance in case of domestic supplies &amp; six (6) weeks in advance in case of foreign supplies.</p><p>PCC 23.4 <strong>Supplement GCC 23.3 with the following:</strong></p><p>The Contractor shall provide the Project Manager with a certified report of the results of any such test and/or inspection within fifteen (15) days after completion of tests.</p><p>PCC 23.6 <strong>Add the following at the end of GCC 23.6:</strong></p><p>All costs incurred by the Employer including all travelling and board and lodging expenses by the repetition of the tests or false call for tests shall be borne by the Contractor pursuant to GCC Sub-Clause 23.2. Any delay in delivery due to retest or false call shall not constitute a release of the Contractor from his responsibilities for delay.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 25. Commissioning and Operational Acceptance</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 25.2.2 The Guarantee Test of the Facilities shall be successfully completed within <strong>one (1) month</strong> from the date of Completion.</p><p>PCC 25.3.1(e) <strong>Add the following new sub-clause:</strong></p><p>Three (3) sets of as built drawings, operating and maintenance manuals and USB drives etc.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 26. Completion Time Guarantee</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 26.2</p><p>Applicable rate for liquidated damages: <strong>1% per week</strong></p><p>The above rate applies to the price of the part of the Facilities, as quoted in the Price Schedule, for that part for which the Contractor fails to achieve Completion within the particular Time for Completion.&nbsp;</p><p>Maximum deduction for liquidated damages: <strong>10</strong><strong><em>% of the Contract Price</em></strong></p><p>PCC 26.3&nbsp;&nbsp;&nbsp; Applicable <em>(amount or rate)</em> for the bonus for early Completion:</p><p>Maximum bonus: <strong>N/A</strong></p><p>PCC 26.3&nbsp;&nbsp;&nbsp; No bonus will be given for earlier Completion of the Facilities or part thereof.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 27. Defect Liability</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 27.10&nbsp; The critical components covered under the extended defect liability are <strong>None</strong>.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 30. Limitation of Liability</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 30.1 (b) The multiplier of the Contract Price is: <strong><em>one (1)</em></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 39. Value Engineering</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 39.1.2 If the value engineering proposal is approved by the Employer the amount to be paid to the Contractor shall be <strong>50 %</strong> of the reduction in the Contract Price</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 39.2.1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>(f) A &ldquo;Change Proposal,&rdquo; which shall include the following:</p><ul><li>Effect on the Resource mobilization schedule</li><li>Effect on Risk Register</li><li>Effect on the payment schedule.</li></ul><p>The Contractor shall implement and maintain appropriate administrative, technical, and physical safeguards to protect the Telecoms network, SCADA system, associated networks, software, hardware, and operational technology assets from unauthorized access, misuse, alteration, disruption, destruction, or disclosure.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC46. Disputes and Arbitration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 46.1&nbsp;&nbsp;&nbsp; The DB shall be appointed within 30 days after a dispute has been declared by either party of the Contract Agreement PCC 46.1</p><p>The DB shall be: comprised of <strong>one (1) person</strong>, who is fluent in the English language and shall be a professional experienced in the type of activities involved in the performance of the Contract and with the interpretation of contractual documents. The potential member is an independent and neutral with no interest in the Contract.</p><p>&nbsp;</p><p>PCC 46.1 List of potential DB members:</p><p><strong>List of arbitrators of the Association of Arbitrators (Southern Africa)</strong> (to be defined at contract signing).</p><p>Proposed by Contractor <em>[Attach CVs to the Contract]</em></p><p><strong><em>List of arbitrators of the Association of Arbitrators</em></strong><em> (Southern Africa) (to be defined at contract signing).</em></p><p>&nbsp;</p><p>PCC 46.2 Appointment (if not agreed) to be made by: <strong><em>Association of Arbitrators (Southern Africa)</em></strong></p><p>PCC 46.5 &nbsp;&nbsp; Procedure to settle disputes in respect of which DB&rsquo;s decision (if any) has not become final and binding shall be finally settled by arbitration:</p><p><strong>Rules of arbitration</strong></p><p>GCC Sub-Clause 46.5(a): For a Foreign Contractor, <em>the dispute shall be finally settled under the Rules of the Rules of the Conduct of Arbitrations (5th Edition 2005) of the Association of Arbitrators (Southern Africa); by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be the neutral location agreed by both parties.</em></p><p>&nbsp;</p><p>GCC Sub-Clause 46.5 (b): For a local Contractor, the dispute shall be finally settled under the Rules of the Rules of the Conduct of Arbitrations (5th Edition 2005) of the Association of Arbitrators (Southern Africa) within the context of the Law of Eswatini; by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be in Eswatini.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 47. </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 47.1- The Contractor shall comply with the following Cyber security requirements:</p><p>1. Comply with IEC 62443 (Industrial Automation and Control Systems cybersecurity).</p><p>2. Support IEC 62351 security measures for power system communications, including secure DNP3 communications where applicable.</p><p>3. Meet the cybersecurity capability requirements of IEEE 1686 for Intelligent Electronic Devices (IEDs).</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:123px; width:613px\"><p><strong>Section X - Contract Forms</strong></p></td></tr></tbody></table><p><strong>Table of Forms</strong></p><p><strong>Notification of Intention to Award. 298</strong></p><p><strong>Letter of Acceptance. 305</strong></p><p><strong>Contract Agreement 306</strong></p><p>Appendix 1.&nbsp; Terms and Procedures of Payment 310</p><p>Appendix 2.&nbsp; Price Adjustment 313</p><p>Appendix 3.&nbsp; Insurance Requirements. 315</p><p>Appendix 4.&nbsp; Time Schedule. 318</p><p>Appendix 5.&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors. 319</p><p>Appendix 6.&nbsp; Scope of Works and Supply by the Employer 320</p><p>Appendix 7.&nbsp; List of Documents for Approval or Review.. 321</p><p>Appendix 8.&nbsp; Functional Guarantees. 322</p><p><strong>Performance Security Form&ndash; Bank Guarantee. 324</strong></p><p><strong>Performance Security Form- Conditional Bank Guarantee. 327</strong></p><p><strong>Advance Payment Security. 329</strong></p><p>&nbsp;</p><p><strong>Notification of Intention to Award</strong></p><p>&nbsp;</p><p><strong>[<em>This Notification of Intention to Award shall be sent to each Bidder that submitted a Bid, unless the Bidder has previously received notice of exclusion from the process at an interim stage of the procurement process</em>]</strong></p><p><strong>[<em>Send this Notification to the Bidder&rsquo;s Authorized Representative named in the Bidder Information Form</em>]</strong></p><p>For the attention of Bidder&rsquo;s Authorized Representative</p><p>Name: <em>[insert Authorized Representative&rsquo;s name]</em></p><p>Address: <em>[insert Authorized Representative&rsquo;s Address]</em></p><p>Telephone/Fax numbers: <em>[insert Authorized Representative&rsquo;s telephone/fax numbers]</em></p><p>Email Address: <em>[insert Authorized Representative&rsquo;s email address]</em></p><p><strong><em>[IMPORTANT: insert the date that this Notification is transmitted to all participating Bidders. The Notification must be sent to all Bidders simultaneously. This means on the same date and as close to the same time as possible.]&nbsp; </em></strong></p><p><strong>DATE OF TRANSMISSION</strong>: This Notification is sent by: [<em>email/fax</em>] on [<em>date</em>] (local time)</p><p><strong>Notification of Intention to Award</strong></p><p><strong>Employer</strong><strong>: </strong><em>[insert the name of the Employer]</em></p><p><strong>Project:<em> </em></strong><em>[insert name of project]</em></p><p><strong>Contract title</strong><strong>: </strong><em>[insert the name of the contract]</em></p><p><strong>Country: </strong><em>[insert country where RFB is issued]</em></p><p><strong>Loan No. /Credit No. / Grant No.:</strong><em> [insert reference number for loan/credit/grant]</em></p><p><strong>RFB No: </strong><em>[insert RFB reference number from Procurement Plan]</em></p><p>This Notification of Intention to Award (Notification) notifies you of our decision to award the above contract. The transmission of this Notification begins the Standstill Period. During the Standstill Period, you may:</p><ol><li>request a debriefing in relation to the evaluation of your Bid, and/or</li><li>submit a Procurement-related Complaint in relation to the decision to award the contract.</li></ol><ol><li><strong>The successful Bidder</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:604px\"><tbody><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:141px\"><p><strong>Name:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:463px\"><p>[<em>insert name</em> <em>of successful Bidder</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p><strong>Address:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p>[<em>insert address</em> <em>of the successful Bidder</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p><strong>Contract price:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p>[<em>insert contract price</em> <em>of the successful Bid</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p>Total combined score:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p><em>[insert the total combined score of the successful Bidder]</em></p></td></tr></tbody></table><ol><li><strong>Other Bidders <em>[INSTRUCTIONS: insert names of all Bidders that submitted a Bid, Bid prices as read out and evaluated, technical scores and&nbsp; combined scores.]</em></strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:599px\"><tbody><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:127px\"><p><strong>Name of Bidder</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:107px\"><p><strong>Technical Score</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:99px\"><p><strong>Bid Price</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:123px\"><p><strong>Evaluated Bid Cost</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:143px\"><p><strong>Combined Score</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr></tbody></table><ol><li><strong>Reason/s why your Bid was unsuccessful</strong><strong><em>[Delete if the combined score already reveals the reason]</em></strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p><strong><em>[INSTRUCTIONS: State the reason/s why <u>this</u> Bidder&rsquo;s Bid was unsuccessful. Do NOT include: (a) a point by point comparison with another Bidder&rsquo;s Bid or (b) information that is marked confidential by the Bidder in its Bid.]</em></strong></p></td></tr></tbody></table><ol><li><strong>How to request a debriefing</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:637px\"><p><strong>DEADLINE: The deadline to request a debriefing expires at midnight on [<em>insert date</em>] (local time).</strong></p><p>You may request a debriefing in relation to the results of the evaluation of your Bid. If you decide to request a debriefing, your written request must be made within three (3) Business Days of receipt of this Notification of Intention to Award.</p><p>Provide the contract name, reference number, name of the Bidder, contact details; and address the request for debriefing as follows:</p><p><strong>Attention</strong>: [<em>insert full name of person, if applicable</em>]</p><p><strong>Title/position</strong>: [<em>insert title/position</em>]</p><p><strong>Agency</strong>: [<em>insert name of Employer</em>]</p><p><strong>Email address</strong>: [<em>insert email address</em>]</p><p><strong>Fax number</strong>: [<em>insert fax number</em>] <strong><em>delete if not used</em></strong></p><p>If your request for a debriefing is received within the 3 Business Days deadline, we will provide the debriefing within five (5) Business Days of receipt of your request. If we are unable to provide the debriefing within this period, the Standstill Period shall be extended by five (5) Business Days after the date that the debriefing is provided. If this happens, we will notify you and confirm the date that the extended Standstill Period will end.</p><p>The debriefing may be in writing, by phone, video conference call or in person. We shall promptly advise you in writing how the debriefing will take place and confirm the date and time.</p><p>If the deadline to request a debriefing has expired, you may still request a debriefing. In this case, we will provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of the Contract Award Notice.</p></td></tr></tbody></table><ol><li><strong>How to make a complaint </strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p>DEADLINE:<strong>:&nbsp; </strong>The deadline for submitting a Procurement-related Complaint challenging the decision to award the contract expires on midnight, [<em>insert date</em>] (local time).</p><p>Provide the contract name, reference number, name of the Bidder, contact details; and address the Procurement-related Complaint as follows:</p><p><strong>Attention</strong>: [<em>insert full name of person, if applicable</em>]</p><p><strong>Title/position</strong>: [<em>insert title/position</em>]</p><p><strong>Agency</strong>: [<em>insert name of Employer</em>]</p><p><strong>Email address</strong>: [<em>insert email address</em>]</p><p><strong>Fax number</strong>: [<em>insert fax number</em>] <strong><em>delete if not used</em></strong></p><p>At this point in the procurement process, you may submit a Procurement-related Complaint challenging the decision to award the contract. You do not need to have requested, or received, a debriefing before making this complaint. Your complaint must be submitted within the Standstill Period and received by us before the Standstill Period ends.</p><p><u>Further information</u>:</p><p>For more information see the Procurement Regulations for IPF Borrowers<u> (Procurement Regulations) </u>(Annex III). You should read these provisions before preparing and submitting your complaint. In addition, the World Bank&rsquo;s Guidance &ldquo;How to make a Procurement-related Complaint<u>&rdquo; </u>provides a useful explanation of the process, as well as a sample letter of complaint.</p><p>In summary, there are four essential requirements:</p><ol><li>You must be an &lsquo;interested party&rsquo;. In this case, that means a Bidder who submitted a Bid in this procurement and is the recipient of a Notification of Intention to Award.</li><li>The complaint can only challenge the decision to award the contract.</li><li>You must submit the complaint within the deadline stated above.</li><li>You must include, in your complaint, all of the information required by the Procurement Regulations (as described in Annex III).</li></ol></td></tr></tbody></table><ol><li><strong>Standstill Period </strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p><strong>DEADLINE: The Standstill Period is due to end at midnight on [<em>insert date</em>] (local time).</strong></p><p>The Standstill Period lasts ten (10) Business Days after the date of transmission of this Notification of Intention to Award.</p><p>The Standstill Period may be extended. This may happen where we are unable to provide a debriefing within the five (5) Business Day deadline. If this happens we will notify you of the extension</p></td></tr></tbody></table><p>If you have any questions regarding this Notification please do not hesitate to contact us.</p><p>On behalf of the Employer:</p><p><strong>Signature:</strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Name:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Title/position:</strong> ______________________________________________</p><p><strong>Telephone:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Email:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE FORM</em></p><p>&nbsp;</p><p><em>This Beneficial Ownership Disclosure Form (&ldquo;Form&rdquo;) is to be completed by the successful Bidder.&nbsp; In case of joint venture, the Bidder must submit a separate Form for each member.&nbsp; The beneficial ownership information to be submitted in this Form shall be current as of the date of its submission. </em></p><p>&nbsp;</p><p><em>For the purposes of this Form, a Beneficial Owner of a Bidder is any natural person who ultimately owns or controls the Bidder by meeting one or more of the following conditions:</em></p><ul><li><em>directly or indirectly holding 25% or more of the shares</em></li><li><em>directly or indirectly holding 25% or more of the voting rights</em></li><li><em>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder</em></li></ul></td></tr></tbody></table><p><br />Beneficial Ownership Disclosure Form</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>RFB No.:</strong> [<em>insert number of RFB process</em>]</p><p><strong>Request for Bid No</strong>.: [<em>insert identification</em>]</p><p>&nbsp;</p><p>To: <strong>[<em>insert complete name of Employer</em>]</strong></p><p>&nbsp;</p><p>In response to your request in the Letter of Acceptance <em>dated [insert date of letter of Acceptance]</em> to furnish additional information on beneficial ownership: <em>[select one option as applicable and delete the options that are not applicable] </em></p><p>&nbsp;</p><p>(i) we hereby provide the following beneficial ownership information.&nbsp;</p><p>&nbsp;</p><p><strong>Details of beneficial ownership </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:600px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:150px\"><p>Identity of Beneficial Owner</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:142px\"><p>Directly or indirectly holding 25% or more of the shares</p><p>(Yes / No)</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:158px\"><p>Directly or indirectly holding 25 % or more of the Voting Rights</p><p>(Yes / No)</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:150px\"><p>Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent governing body of the Bidder</p><p>(Yes / No)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:150px\"><p><em>[include full name (last, middle, first), nationality, country of residence]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:142px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:158px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:150px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>OR</em></strong></p><p>&nbsp;</p><p>(ii) <em>We declare that there is no Beneficial Owner meeting one or more of the following conditions: </em></p><ul><li>directly or indirectly holding 25% or more of the shares</li><li>directly or indirectly holding 25% or more of the voting rights</li><li>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder</li></ul><p>&nbsp;</p><p><strong>OR </strong></p><p>&nbsp;</p><p><em>(iii) We declare that we are unable to identify any Beneficial Owner meeting one or more of the following conditions. [If this option is selected, the Bidder shall provide explanation on why it is unable to identify any Beneficial Owner]</em></p><ul><li>directly or indirectly holding 25% or more of the shares</li><li>directly or indirectly holding 25% or more of the voting rights</li><li>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder]&rdquo;</li></ul><p>&nbsp;</p><p><strong>Name of the Bidder</strong>: *<u>[<em>insert complete name of the Bidder</em>]_________</u></p><p>&nbsp;</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: **<u>[<em>insert complete name of person duly authorized to sign the Bid</em>]___________</u></p><p>&nbsp;</p><p><strong>Title of the person signing the Bid</strong>: <u>[<em>insert complete title of the person signing the Bid</em>]______</u></p><p>&nbsp;</p><p><strong>Signature of the person named above</strong>: <u>[<em>insert signature of person whose name and capacity are shown above</em>]_____</u></p><p>&nbsp;</p><p><strong>Date signed</strong> <u>[<em>insert date of signing</em>]</u> <strong>day of</strong> <u>[<em>insert month</em>], [<em>insert year</em>]_____</u></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>* In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder. In the event that the Bidder is a joint venture, each reference to &ldquo;Bidder&rdquo; in the Beneficial Ownership Disclosure Form (including this Introduction thereto) shall be read to refer to the joint venture member.</p><p>** Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Letter of Acceptance</strong></p><p><em>______________________</em></p><p>To:&nbsp; <em>____________________________</em></p><p>&nbsp;</p><p>This is to notify you that your Bid dated <em>____________</em> for execution of the <em>_________________</em> for the Contract Price in the aggregate of <em>_____________________ ________________</em>, as corrected and modified in accordance with the Instructions to Bidders is hereby accepted by our Agency.</p><p>&nbsp;</p><p>You are requested to furnish (i) the Performance Security within 28 days in accordance with the Conditions of Contract, using for that purpose one of the Performance Security Form<em>s</em> and (ii) the additional information on beneficial ownership in accordance with ITB 46.1, within eight (8) Business days using the Beneficial Ownership Disclosure Form, included in Section X, - Contract Forms, of the bidding document.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Authorized Signature:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name and Title of Signatory:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name of Agency:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attachment:&nbsp; Contract Agreement</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Contract Agreement</strong></p></td></tr></tbody></table><p>THIS AGREEMENT is made the ________ day of ________________________, _____,</p><p>BETWEEN</p><p>&nbsp;</p><p>(1)<strong>Eswatini Electricity Company</strong> a corporation incorporated under the laws of the kingdom of Eswatini and having its principal place of business at <strong>Eluvatsini house, Mhlambanyatsi Road Mbabane, Eswatini &nbsp;(</strong>hereinafter called &ldquo;the Employer&rdquo;), and (2) <em>______________________</em>, a corporation incorporated under the laws of <em>________________________</em> and having its principal place of business at <em>________________________</em> (hereinafter called &ldquo;the Contractor&rdquo;).</p><p>&nbsp;</p><p>WHEREAS the Employer desires to engage the Contractor to design, manufacture, test, deliver, install, complete and commission certain Facilities, viz. <strong>Design Supply and Installation<em> of 11kV auto reclosers under the Accelerating Sustainable and Clean Energy Access Transformation </em></strong><em>(ASCENT) Project </em>(&ldquo;the Facilities&rdquo;), and the Contractor has agreed to such engagement upon and subject to the terms and conditions hereinafter appearing.</p><p>&nbsp;</p><p>NOW IT IS HEREBY AGREED as follows:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 1.&nbsp; Contract Documents</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>1.1&nbsp;&nbsp;&nbsp; <u>Contract Documents</u> (Reference GCC Clause 2)</p><p>The following documents shall constitute the Contract between the Employer and the Contractor, and each shall be read and construed as an integral part of the Contract:</p><p>(a)&nbsp;&nbsp;&nbsp; This Contract Agreement and the Appendices hereto</p><p>(b)&nbsp;&nbsp;&nbsp; Letter of Bid and Price Schedules submitted by the Contractor</p><p>(c)&nbsp;&nbsp;&nbsp; Particular Conditions</p><p>(d)&nbsp;&nbsp;&nbsp; General Conditions</p><p>(e)&nbsp;&nbsp;&nbsp; Specification</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; Drawings</p><p>(g)&nbsp;&nbsp;&nbsp; Other completed Bidding forms submitted with the Bid</p><p>(h)&nbsp;&nbsp;&nbsp; Any other documents forming part of the Employer&rsquo;s Requirements</p><p>(i)&nbsp;&nbsp;&nbsp; Any other documents forming part of the contract, including, but not limited to:</p><ol><li><ol><li><ol><li><strong>the ES Management Strategies and Implementation Plans; and</strong></li><li><strong>Code of Conduct for Contractor&rsquo;s Personnel (ES).</strong></li><li><strong>The SEA/SH prevention and Response Plan</strong></li><li><strong>Project ESMF</strong></li><li><strong>Project Labour Management </strong></li></ol></li></ol></li></ol><p>1.2&nbsp;&nbsp;&nbsp; <u>Order of Precedence</u> (Reference GCC Clause 2)</p><p>In the event of any ambiguity or conflict between the Contract Documents listed above, the order of precedence shall be the order in which the Contract Documents are listed in Article 1.1 (Contract Documents) above.</p><p>1.3&nbsp;&nbsp;&nbsp; <u>Definitions</u> (Reference GCC Clause 1)</p><p>Capitalized words and phrases used herein shall have the same meanings as are ascribed to them in the General Conditions.</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 2.&nbsp; Contract Price and Terms of Payment</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>2.1&nbsp;&nbsp;&nbsp; <u>Contract Price</u> (Reference GCC Clause 11)</p><p>The Employer hereby agrees to pay to the Contractor the Contract Price in consideration of the performance by the Contractor of its obligations hereunder.&nbsp; The Contract Price shall be the aggregate of:&nbsp; <em>__________________</em>, <em>_______________</em> as specified in Price Schedule No. 5 (Grand Summary), and<em>_______________</em>, <em>_________________</em>, or such other sums as may be determined in accordance with the terms and conditions of the Contract.</p><p>2.2&nbsp;&nbsp;&nbsp; <u>Terms of Payment</u> (Reference GCC Clause 12)</p><p>The terms and procedures of payment according to which the Employer will reimburse the Contractor are given in the Appendix (Terms and Procedures of Payment) hereto.</p><p>The Employer will not instruct its bank to issue an irrevocable confirmed documentary credit made available to the Contractor in a bank in the country of the Contractor. The credit shall be for an amount of <em>$0.00</em> and shall be subject to the Uniform Customs and Practice for Documentary Credits 2007 Revision, ICC Publication No. 600.</p><p>In the event that the amount payable under Schedule No. 1 is adjusted in accordance with GCC 11.2 or with any of the other terms of the Contract, the Employer shall arrange for the documentary credit to be amended accordingly.</p><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 3.&nbsp; Effective Date </strong></p></td><td style=\"vertical-align:top; width:466px\"><p>3.1&nbsp;&nbsp;&nbsp; <u>Effective Date</u> (Reference GCC Clause 1)</p><p>The Effective Date from which the Time for Completion of the Facilities shall be counted is the date when all of the following conditions have been fulfilled:</p><p>(a)&nbsp;&nbsp;&nbsp; This Contract Agreement has been duly executed for and on behalf of the Employer and the Contractor;</p><p>(b)&nbsp;&nbsp;&nbsp; The Contractor has submitted to the Employer the Performance Security and the advance payment guarantee;</p><p>(c)&nbsp;&nbsp;&nbsp; The Employer has paid the Contractor the advance payment;</p><p>(f) Individual Letters from key personnel confirming availability</p><p>Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.</p><p>3.2&nbsp;&nbsp;&nbsp; If the conditions listed under 3.1 are not fulfilled within two (2) months from the date of this Contract notification because of reasons not attributable to the Contractor, the Parties shall discuss and agree on an equitable adjustment to the Contract Price and the Time for Completion and/or other relevant conditions of the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 4.&nbsp; Communications</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>4.1&nbsp;&nbsp;&nbsp; The address of the Employer for notice purposes, pursuant to GCC 4.1 is: <em>______________________</em>.</p><ol><li><ol><li>The address of the Contractor for notice purposes, pursuant to GCC 4.1 is: <em>________________________.</em></li></ol></li></ol></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 5.&nbsp; Appendices</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>5.1&nbsp;&nbsp;&nbsp; The Appendices listed in the attached List of Appendices shall be deemed to form an integral part of this Contract Agreement.</p><ol><li><ol><li>Reference in the Contract to any Appendix shall mean the Appendices attached hereto, and the Contract shall be read and construed accordingly.</li></ol></li></ol></td></tr></tbody></table><p>&nbsp;</p><p>IN WITNESS WHEREOF the Employer and the Contractor have caused this Agreement to be duly executed by their duly authorized representatives the day and year first above written.</p><p>&nbsp;</p><p>Signed by, for and on behalf of the Employer</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Signature]</em></p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Title]</em></p><p>&nbsp;</p><p>in the presence of <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>Signed by, for and on behalf of the Contractor</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Signature]</em></p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Title]</em></p><p>&nbsp;</p><p>in the presence of <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>APPENDICES</p><p>&nbsp;</p><p>Appendix 1&nbsp;&nbsp;&nbsp;&nbsp; Terms and Procedures of Payment</p><p>Appendix 2&nbsp;&nbsp;&nbsp;&nbsp; Price Adjustment</p><p>Appendix 3&nbsp;&nbsp;&nbsp;&nbsp; Insurance Requirements</p><p>Appendix 4&nbsp;&nbsp;&nbsp;&nbsp; Time Schedule</p><p>Appendix 5&nbsp;&nbsp;&nbsp;&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors</p><p>Appendix 6&nbsp;&nbsp;&nbsp;&nbsp; Scope of Works and Supply by the Employer</p><p>Appendix 7&nbsp;&nbsp;&nbsp;&nbsp; List of Documents for Approval or Review</p><p>Appendix 8&nbsp;&nbsp;&nbsp;&nbsp; Functional Guarantees</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 1.&nbsp; Terms and Procedures of Payment</strong></p><p>In accordance with the provisions of GCC Clause 12 (Terms of Payment), the Employer shall pay the Contractor in the following manner and at the following times, on the basis of the Price Breakdown given in the section on Price Schedules.&nbsp; Payments will be made in the currencies quoted by the Bidder unless otherwise agreed between the Parties.&nbsp; Applications for payment in respect of part deliveries may be made by the Contractor as work proceeds.</p><p>&nbsp;</p><p>TERMS OF PAYMENT</p><p>&nbsp;</p><p><u>Schedule No. 1.&nbsp; Plant and Equipment Supplied from Abroad</u></p><p>In respect of plant and equipment supplied from abroad, the following payments shall be made:</p><p>Ten percent (10%) of the total CIP amount as an advance payment against receipt of invoice and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of the plant and equipment delivered to the site, as evidenced by shipping and delivery documents.</p><p>Eighty percent (80%) of the total or pro rata CIP amount upon Incoterm &ldquo;CIP&rdquo;, upon delivery to the site within forty-five (45) days after receipt of documents.</p><p>Five percent (5%) of the total or pro rata CIP amount upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata CIP amount upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 2.&nbsp; Plant and Equipment Supplied from within the Employer&rsquo;s Country</u></p><p>In respect of plant and equipment supplied from within the Employer&rsquo;s Country, the following payments shall be made:</p><p>Ten percent (10%) of the total EXW amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of the plant and equipment delivered to the site, as evidenced by shipping and delivery documents.</p><p>Eighty percent (80%) of the total or pro rata EXW amount upon Incoterm &ldquo;Ex-Works,&rdquo; upon delivery to the site within forty-five (45) days after receipt of invoice and documents<em>.</em></p><p>Five percent (5%) of the total or pro rata EXW amount upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata EXW amount upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 3.&nbsp; Design Services</u></p><p>In respect of design services for both the foreign currency and the local currency portions, the following payments shall be made:</p><p>Ten percent (10%) of the total design services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp;</p><p>Ninety percent (90%) of the total or pro rata design services amount upon acceptance of design in accordance with GCC Clause 20 by the Project Manager within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 4.&nbsp; Installation Services</u></p><p>In respect of installation services for both the foreign and local currency portions, the following payments shall be made:</p><p>Ten percent (10%) of the total installation services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of work performed by the Contractor as evidenced by the invoices for installation services.</p><p>Eighty percent (80%) of the measured value of work performed by the Contractor, as identified in the said Program of Performance, during the preceding month, as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s application, will be made monthly within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata value of installation services performed by the Contractor as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s monthly applications, upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata value of installation services performed by the Contractor as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s monthly applications, upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p>In the event that the Employer fails to make any payment on its respective due date, the Employer shall pay to the Contractor interest on the amount of such delayed payment at the rate of for local currency/CMA (<em>lending Rate at Central Bank of Eswatini plus 1%) &divide;12 and &ldquo;for USD, the (Secured Overnight Financing Rate (SOFR) plus 1%) &divide;12&nbsp; ; for Euro,( EURIBOR plus 1%) &divide;12; </em>per month for period of delay until payment has been made in full.</p><p>&nbsp;</p><p><strong>PAYMENT PROCEDURES</strong></p><p>&nbsp;</p><p><strong>The procedures to be followed in applying for certification and making payments shall be as follows:</strong></p><p>The Contractor should submit invoice outlining the pay items covering the pro rata value of Supply/Work Done along with the submission of the following documents to the Project Manager:</p><ol><li><ol><li><ol><li><strong><u>For Supply: </u></strong></li></ol></li></ol></li><li>Three (3) copies of Contractor&rsquo;s invoice certified by the Employer showing contract no., description of goods, quantity, unit price and total amount.</li><li>Payment Authorization as per the specified format duly signed by the authorized official (s), designated by the Employer to operate the Line of Credit.</li><li>Original and Six (6) copies of negotiable, clean, on-board bill of lading marked freight prepaid / Lorry Receipt and 6 copies of non-negotiable bill of lading / Lorry Receipt.</li><li>Three (3) copies of Detailed Packing list identifying contents of each package.</li><li>Insurance Policy/Certificate.</li><li>Manufacturer&rsquo;s / Supplier&rsquo;s Warranty Certificate.</li><li>Dispatch authorization issued by the employer with the factory inspection report.</li><li>Certificate of origin.<ol><li><ol><li><strong><u>For Design Services and Installation Services:</u></strong></li></ol></li></ol></li></ol><ol><li>All Payments for the works in part or full shall be based upon measurements or otherwise as per the Contract. After excavation before filling the trench/holes, the Contractor shall take and record measurements in presence of the authorized representatives of the Employer.</li><li>The Value of work executed shall be determined by the Employer. The Value of work executed shall comprise the value of the quantities of the items in the Price Bid.</li><li>The Contractor seeking any payment shall submit to the Employer an Invoice with bills with the relevant approved measurement certificates and other requisite documents, duly signed by the site representatives of the Employer. The Employer will then verify the bills and approve for release of payment.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 2.&nbsp; Price Adjustment (Not Applicable)</strong></p><p><strong>The prices are to remain firm and fixed for the duration of the Contract.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 3.&nbsp; Insurance Requirements</strong></p><p><strong>Insurances to be Taken Out by the Contractor</strong></p><p>In accordance with the provisions of GCC Clause 34, the Contractor shall at its expense take out and maintain in effect, or cause to be taken out and maintained in effect, during the performance of the Contract, the insurances set forth below in the sums and with the deductibles and other conditions specified.&nbsp; The identity of the insurers and the form of the policies shall be subject to the approval of the Employer, such approval not to be unreasonably withheld.</p><p>(a)&nbsp;&nbsp;&nbsp; <u>Cargo Insurance</u></p><p>Covering loss or damage occurring, while in transit from the supplier&rsquo;s or manufacturer&rsquo;s works or stores until arrival at the Site, to the Facilities (including spare parts therefor) and to the construction equipment to be provided by the Contractor or its Subcontractors.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>110% of the Contract Price</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Manufacturer&rsquo;s&nbsp;&nbsp; Works</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Site</p></td></tr></tbody></table><p>&nbsp;</p><p>(b)&nbsp;&nbsp;&nbsp; <u>Installation All Risks Insurance</u></p><p>Covering physical loss or damage to the Facilities at the Site, occurring prior to completion of the Facilities, with an extended maintenance coverage for the Contractor&rsquo;s liability in respect of any loss or damage occurring during the defect liability period while the Contractor is on the Site for the purpose of performing its obligations during the defect liability period.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>110% of the Contract Price</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Receipt of site</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>(c)&nbsp;&nbsp;&nbsp; <u>Third Party Liability Insurance</u></p><p>Covering bodily injury or death suffered by third parties (including the Employer&rsquo;s personnel) and loss of or damage to property (including the Employer&rsquo;s property and any parts of the Facilities that have been accepted by the Employer) occurring in connection with the supply and installation of the Facilities.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:124px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:132px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:94px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 100,000 per person per occasion</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 10,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Third party personnel</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 50,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer&rsquo;s Property</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>(d)&nbsp;&nbsp;&nbsp; <u>Automobile Liability Insurance</u></p><p>Covering use of all vehicles used by the Contractor or its Subcontractors (whether or not owned by them) in connection with the supply and installation of the Facilities.&nbsp; Comprehensive insurance in accordance with statutory requirements.</p><p>&nbsp;</p><p>(e)&nbsp;&nbsp;&nbsp; <u>Workers&rsquo; Compensation</u></p><p>In accordance with the statutory requirements applicable in any country where the Facilities or any part thereof is executed.</p><p>&nbsp;</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; <u>Employer&rsquo;s Liability</u></p><p>In accordance with the statutory requirements applicable in any country where the Facilities or any part thereof is executed.</p><p>&nbsp;</p><p>(g)&nbsp;&nbsp;&nbsp; <u>Other Insurances</u></p><p>The Contractor is also required to take out and maintain at its own cost the following insurances:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>To be indicated by the Contractor</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Receipt of site</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>The Employer shall be named as co-insured under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Third Party Liability, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances, and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Cargo, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances.&nbsp; All insurer&rsquo;s rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.</p><p>&nbsp;</p><p><strong>Insurances To Be Taken Out By The Employer</strong></p><p>&nbsp;</p><p>The Employer shall at its expense take out and maintain in effect during the performance of the Contract the following insurances.</p><p>&nbsp;</p><p><u>Details</u>:</p><p><strong>NIL</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 4.&nbsp; Time Schedule</strong></p><p><strong>4.1 Description of Facilities: </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:302px\"><p><strong>Name of Facilities</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Completion Time required by the Employer from the Effective Date</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:146px\"><p><strong>Completion date guaranteed by the Bidder from the effective date</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:302px\"><p><strong>Design, Supply and installation of 11kV auto-reclosers</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:151px\"><p>&nbsp;</p><p><strong>Six (6) Months</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:146px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>4.2 The activities under the Contractor&rsquo;s program for Project Completion shall be in the form of a master network (MNW) and shall identify the various activities like design, engineering, manufacturing, supply, installation, factory testing, transportation to site, site testing and commissioning, trial operation and taking over etc. of the facilities or specific part thereof (where specific parts are specified in PCC). The network shall conform to the above Project Completion Schedule. This master network will be discussed and agreed before Kick-off meeting in line with the above. The detailed network(s) and project implementation plans &amp; programs shall preferably be prepared in Primavera or in MS Project or in the latest Project Management tool as convenient to the Employer and shall form part of the contract.</strong></p><p><strong>4.3</strong> The Employer reserves the right to request minor changes in the work schedule at the time of Award of Contract to the successful Bidder.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 5.&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors</strong></p><p>A list of major items<u> of Plant and Installation Services is provided below.</u></p><p>&nbsp;</p><p>The following Subcontractors and/or manufacturers are approved for carrying out the items of the Facilities indicated below.&nbsp; Where more than one Subcontractor is listed, the Contractor is free to choose between them, but it must notify the Employer of its choice in good time prior to appointing any selected Subcontractor.&nbsp; In accordance with GCC Sub-Clause 19.1, the Contractor is free to submit proposals for Subcontractors for additional items from time to time.&nbsp; No Subcontracts shall be placed with any such Subcontractors for additional items until the Subcontractors have been approved in writing by the Employer and their names have been added to this list of Approved Subcontractors.</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:205px\"><p><strong>Major Items of Plant and Installation Services</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:294px\"><p><strong>Approved Subcontractors/Manufacturers</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:115px\"><p><strong>Nationality</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 6.&nbsp; Scope of Works and Supply by the Employer</strong></p><p>The following personnel, facilities, works and supplies will be provided/supplied by the Employer, and the provisions of GCC Clauses 10, 21 and 24 shall apply as appropriate. All personnel, facilities, works and supplies will be provided by the Employer in good time so as not to delay the performance of the Contractor, in accordance with the approved Time Schedule and Program of Performance pursuant to GCC Sub-Clause 18.2.</p><p>Unless otherwise indicated, all personnel, facilities, works and supplies will be provided free of charge to the Contractor.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:300px\"><p><strong><u>Personnel</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>Operational staff for witnessing works, arranging outages and supervision during network outages.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Facilities</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Works</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>Dismantling of existing 11 kV infrastructure at all 13 sites</li><li>Dismantling of existing 11 kV infrastructure at all 13 sites&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><u>None</u></p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Supplies</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>4 D10/11 poles per site and corresponding steel cross arms</li><li>13 x 16KVA 11/0.23kV transformers and corresponding MV surge arrestors, LV MCB in pole mounted box</li><li>Supply of Camo earthing conductor, clamps, spikes, lugs and conductive cement for all 13 sites</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><u>None</u></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 7.&nbsp; List of Documents for Approval or Review</strong></p><p>&nbsp;</p><p>Pursuant to GCC Sub-Clause 20.3.1, the Contractor shall prepare, or cause its Subcontractor to prepare, and present to the Project Manager in accordance with the requirements of GCC Sub-Clause 18.2 (Program of Performance), the following documents for</p><p>&nbsp;</p><p>A.&nbsp;&nbsp;&nbsp;&nbsp; <u>Approval</u></p><ul><li>Project schedule/Baseline</li><li>Occupational Health and Safety plan/ file</li><li>Insurance and securities</li><li>Organization chart</li><li>Key personnel CV</li><li>Activity method statements</li><li>Design report (design basis, calculations, drawings)</li><li>Equipment data sheets</li><li>Equipment drawings</li><li>Recovery Plan</li><li>Quality assurance documents</li><li>Equipment inspection, SAT and FAT Repots</li><li>Signal list</li><li>Inspection &amp; Test Plan</li><li>Commissioning procedure and plan</li><li>Test results</li><li>Commissioning reports</li><li>Approved manufacturer list</li><li>Training manual</li><li>As built drawings and</li><li>Final Completion report</li></ul><p>&nbsp;</p><p>B.&nbsp;&nbsp;&nbsp;&nbsp; <u>Review</u></p><ul><li>Risk register</li><li>Work permits</li><li>Resource mobilization plan</li><li>Communication matrix</li><li>O &amp; M manuals</li><li>Monthly progress reports</li><li>Weekly site report</li><li>Daily site report</li><li>Final handover documents</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 8.&nbsp; Functional Guarantees</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>General</u></p><p>This Appendix sets out</p><p>(a)&nbsp;&nbsp;&nbsp; the functional guarantees referred to in GCC Clause 28 (Functional Guarantees)</p><p>(b)&nbsp;&nbsp;&nbsp; the preconditions to the validity of the functional guarantees, either in production and/or consumption, set forth below</p><p>(c)&nbsp;&nbsp;&nbsp; the minimum level of the functional guarantees</p><p>(d)&nbsp;&nbsp;&nbsp; the formula for calculation of liquidated damages for failure to attain the functional guarantees.</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Preconditions</u></p><p>The Contractor gives the functional guarantees (specified herein) for the facilities, subject to the following preconditions being fully satisfied:</p><p><em>____________________________________________________________________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Functional Guarantees</u></p><p>Subject to compliance with the foregoing preconditions, the Contractor guarantees as follows:</p><p>3.1&nbsp;&nbsp;&nbsp; Production Capacity</p><p><em>_____________________________________________________________________________</em></p><p><strong>and/or</strong></p><p>3.2&nbsp;&nbsp;&nbsp; Raw Materials and Utilities Consumption</p><p><em>____________________________________________________________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Failure in Guarantees and Liquidated Damages</u></p><p>4.1&nbsp;&nbsp;&nbsp; Failure to Attain Guaranteed Production Capacity</p><p>If the production capacity of the facilities attained in the guarantee test, pursuant to GCC Sub-Clause 25.2, is less than the guaranteed figure specified in para. 3.1 above, but the actual production capacity attained in the guarantee test is not less than the minimum level specified in para. 4.3 below, and the Contractor elects to pay liquidated damages to the Employer in lieu of making changes, modifications and/or additions to the Facilities, pursuant to GCC Sub-Clause 28.3, then the Contractor shall pay liquidated damages at the rate of <em>___________________</em> for every complete one percent (1%) of the deficiency in the production capacity of the Facilities, or at a proportionately reduced rate for any deficiency, or part thereof, of less than a complete one percent (1%).</p><p>4.2&nbsp;&nbsp;&nbsp; Raw Materials and Utilities Consumption in Excess of Guaranteed Level</p><p><em>__________________________________________________________________</em></p><p>If the actual measured figure of specified raw materials and utilities consumed per unit (or their average total cost of consumption) exceeds the guaranteed figure specified in para. 3.2 above (or their specified average total cost of consumption), but the actual consumption attained in the guarantee test, pursuant to GCC Sub-Clause 25.2, is not more than the maximum level specified in para. 4.3 below, and the Contractor elects to pay liquidated damages to the Employer in lieu of making changes, modifications and/or additions to the Facilities pursuant to GCC Sub-Clause 28.3, then the Contractor shall pay liquidated damages at the rate of <em>[amount in the contract currency]</em> for every complete one percent (1%) of the excess consumption of the Facilities, or part thereof, of less than a complete one percent (1%).</p><p>4.3&nbsp;&nbsp;&nbsp; Minimum Levels</p><p>Notwithstanding the provisions of this paragraph, if as a result of the guarantee test(s), the following minimum levels of performance guarantees (and consumption guarantees) are not attained by the Contractor, the Contractor shall at its own cost make good any deficiencies until the Facilities reach any of such minimum performance levels, pursuant to GCC Sub-Clause 28.2:</p><p>(a)&nbsp;&nbsp;&nbsp; production capacity of the Facilities attained in the guarantee test:&nbsp; ninety-five percent (95%) of the guaranteed production capacity (the values offered by the Contractor in its Bid for functional guarantees represents 100%).</p><p><strong>and/or</strong></p><p>(b)&nbsp;&nbsp;&nbsp; average total cost of consumption of all the raw materials and utilities of the Facilities:&nbsp; one hundred and five percent (105%) of the guaranteed figures (the figures offered by the Contractor in its Bid for functional guarantees represents 100%).</p><p>4.4&nbsp;&nbsp;&nbsp; Limitation of Liability</p><p>Subject to para. 4.3 above, the Contractor&rsquo;s aggregate liability to pay liquidated damages for failure to attain the functional guarantees shall not exceed ______ percent ( ___ %) of the Contract price.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Performance Security Form&ndash; Bank Guarantee[18]</strong></p><p><em>[Guarantor letterhead or SWIFT identifier code]</em></p><p><strong>Beneficiary:</strong>&nbsp;&nbsp; <em>[insert name and Address of </em>Employer<em>]</em></p><p>&nbsp;</p><p><strong>Date:</strong>&nbsp;&nbsp; _<em> [Insert date of issue]</em></p><p><strong>PERFORMANCE GUARANTEE No.: ____</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor:&nbsp; </strong><em>[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p>We have been informed that <em>____________________</em> (hereinafter called &ldquo;the Applicant&rdquo;) has entered into Contract No. <em>________________</em>dated ____________ with the Beneficiary, for the execution of <em>____________________________</em> (hereinafter called &ldquo;the Contract&rdquo;).</p><p>&nbsp;</p><p>Furthermore, we understand that, according to the conditions of the Contract, a performance guarantee is required.</p><p>At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of <em>_________________</em>(<u>___</u>)<em><strong>[19]</strong></em>,such sum being payable in the types and proportions of currencies in which the Contract Price is payable, upon receipt by us of the Beneficiary&rsquo;s complying demand supported by the Beneficiary&rsquo;s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without the Beneficiary needing to prove or to show grounds for your demand or the sum specified therein.</p><p>This guarantee shall be reduced by half upon our receipt of:</p><p>&nbsp;</p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a copy of the Operational Acceptance Certificate; or</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant (i) attaching a copy of its notice requesting issuance of the Operational Acceptance Certificate and (ii) stating that the Project Manager has failed to issue such Certificate within the time required or provide in writing justifiable reasons why such Certificate has not been issued, so that Operational Acceptance is deemed to have occurred.</p><p>&nbsp;</p><p>This guarantee shall expire no later than the earlier of:<em><strong>[20]</strong></em></p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; twelve months after our receipt of either (a) or (b) above; or</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; eighteen months after our receipt of:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a copy of the Completion Certificate; or</p><p>(ii) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant, attaching a copy of the notice to the Project Manager that the Facilities are ready for commissioning, and stating that fourteen days have elapsed from receipt of such notice (or seven days have elapsed if the notice was a repeated notice) and the Project Manager has failed to issue a Completion Certificate or inform the Applicant in writing of any defects or deficiencies; or</p><p>(iii) &nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant stating that no Completion Certificate has been issued but the Employer is making use of the Facilities; or</p><p>&nbsp;</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the ____ day of _____, 2___.[21]</p><p>&nbsp;</p><p>Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby excluded.</p><p>_____________________<br /><em>[signature(s)]</em></p><p><br />&nbsp;</p><p><strong><em>Note:&nbsp; All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p><strong>Performance Security Form- Conditional Bank Guarantee</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>To: ___________________________________</p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>We refer to the Contract Agreement (&ldquo;the Contract&rdquo;) signed on [date] between you and ____________________________ (&ldquo;the Contractor&rdquo;) concerning design, execution and completion of ____________________________.</p><p>By this letter we, the undersigned, [name of Bank], a Bank (or company) organized under the laws of _________________ and having its registered/principal office at _________________, do hereby jointly and severally with the Contractor irrevocably guarantee payment owed to you by the Contractor, pursuant to the Contract, up to the sum of ___________, equivalent to _______________ percent (%)&nbsp; of the Contract Price until the date of the Operational Acceptance Certificate and thereafter up to a sum of ____________, equivalent to__________ percent (%)&nbsp; of the Contract Price, until twelve (12) months after the date of Operational Acceptance, or eighteen (18) months after Completion of the Facilities, whichever comes first.</p><p>Where it is agreed between you and the Contractor that the Facilities are to be accepted in parts, and thus where there are separate Completion and Operational Acceptance Certificates for each part, this Letter of Guarantee shall be apportioned to the value of each such part and shall reduce or expire as provided above on or following Completion or Operational Acceptance of each part.</p><p>We shall only undertake to make payment under this Letter of Guarantee upon our receipt of a written demand signed by your duly authorized officer for a specified sum, where such demand sets out the reasons for your claim under this Letter of Guarantee and is accompanied by</p><p>(a)&nbsp;&nbsp;&nbsp; a copy of the written notice sent by you to the Contractor before making the claim under this Guarantee, specifying the Contractor&rsquo;s breach of contract and requesting the Contractor to remedy it</p><p>(b)&nbsp;&nbsp;&nbsp; a letter signed by your duly authorized officer certifying that the Contractor has failed to remedy the default within the period allowed for remedial action</p><p>(c)&nbsp;&nbsp;&nbsp; a copy of your written notice to the Contractor stating your intent to claim under this Letter of Guarantee because of the Contractor&rsquo;s failure to remedy the default in accordance with the request referred to in para. (a) above.</p><p>Our liability under this Letter of Guarantee shall be to pay to you whichever is the lesser of the sum so requested or the amount then guaranteed hereunder in respect of any demand duly made hereunder prior to expiry of this Letter of Guarantee, without being entitled to inquire whether or not this payment is lawfully demanded.</p><p>This Letter of Guarantee shall be valid from the date of issue until the earlier of twelve (12) months after the date of Operational Acceptance or eighteen (18) months after the date of Completion of the Facilities or, where the Facilities are to be accepted in parts, twelve (12) months after the date of Operational Acceptance or eighteen (18) months after the date of Completion of the last part or [date], whichever comes first.</p><p>Except for the documents herein specified, no other documents or other action shall be required, notwithstanding any applicable law or regulation.</p><p>If the Defect Liability Period is extended with respect to any part of the Facilities in accordance with the Contract, you shall notify us, and the validity of this Letter of Guarantee shall be extended with respect to the percentage of the Contract Price stipulated in the notification until expiry of such extended Defect Liability Period.</p><p>Our liability under this Letter of Guarantee shall become null and void immediately upon its expiry, whether it is returned or not, and no claim may be made hereunder after such expiry or after the aggregate of the sums paid by us to you shall equal the sums guaranteed hereunder, whichever is the earlier.</p><p>All notices to be given hereunder shall be given by registered (airmail) post to the addressee at the address herein set out or as otherwise advised by and between the parties hereto.</p><p>We hereby agree that any part of the Contract may be amended, renewed, extended, modified, compromised, released or discharged by mutual agreement between you and the Contractor, and this security may be exchanged or surrendered without in any way impairing or affecting our liabilities hereunder without notice to us and without the necessity for any additional endorsement, consent or guarantee by us, provided, however, that the sum guaranteed shall not be increased or decreased.</p><p>No action, event or condition which by any applicable law should operate to discharge us from liability hereunder shall have any effect and we hereby waive any right we may have to apply such law, so that in all respects our liability hereunder shall be irrevocable and, except as stated herein, unconditional in all respects.</p><p>Yours truly,</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Authorized Signature</p><p>&nbsp;</p><p><strong>Advance Payment Security</strong></p><p><strong>Demand Guarantee</strong></p><p><em>[Guarantor letterhead or SWIFT identifier code] </em></p><p>&nbsp;</p><p><strong>Beneficiary: </strong><strong><em>........................................................ </em></strong><strong><em>Name and Address of Employer</em></strong><strong><em> ..................................................... </em></strong></p><p><strong>Date:</strong><em>[Insert date of issue]</em><strong><em>..................................................................................................................................................... </em></strong></p><p><strong>Advance Payment Guarantee No.:</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor: </strong><em>&nbsp;[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p><strong><em>............................................................................................................................................................................................................................ </em></strong></p><p>We have been informed that . . . . .. . . . .&nbsp; (hereinafter called &ldquo;the Applicant&rdquo;) has entered into Contract No. . . . . .<em>. . . . . </em>dated . . . . . . ..with the Beneficiary, for the execution of, . . . . . .<em>. </em>. . . .&nbsp; (hereinafter called &ldquo;the Contract&rdquo;).</p><p>Furthermore, we understand that, according to the Conditions of the Contract, an advance payment in the sum&nbsp; . . . . .<em>. . . . . . </em>(. . . . .<em>. . . . </em>.&nbsp; ) is to be made against an advance payment guarantee.</p><p>At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of .<br />(. . . . .<em>. . . . . </em>&nbsp;) [22] upon receipt by us of the Beneficiary&rsquo;s complying demand supported by the Beneficiary&rsquo;s statement whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating either that the applicant:</p><ol><li><ol><li><ol><li><strong>has used the advance payment for purposes other than the costs of mobilization in respect of the Facilities; or</strong></li><li><strong>&nbsp;has failed to repay the advance payment in accordance with the Contract conditions, specifying the amount which the Applicant has failed to repay. </strong></li></ol></li></ol></li></ol><p>A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Beneficiary&rsquo;s bank stating that the advance payment referred to above has been credited to the Applicant on its account number ___________ at _________________..</p><p>&nbsp;</p><p>The maximum amount of this guarantee shall be progressively reduced by the amount of the advance payment repaid by the Applicant as indicated in copies of interim statements or payment certificates which shall be presented to us.&nbsp; This guarantee shall expire, at the latest, upon our receipt of documentation indicating full repayment by the Applicant of the amount of the advance payment, or on the . . . day of . . . . . . . , . . . . .[23], whichever is earlier.&nbsp; Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby excluded.</p><p>&nbsp;</p><p>____________________ <em>[signature(s)]</em></p><p><br /><strong><em>Note:&nbsp; All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p>&nbsp;</p><p>[1]&nbsp;&nbsp; Nonperformance, as decided by the Employer, shall include all contracts where (a) nonperformance was not challenged by the contractor, including through referral to the dispute resolution mechanism under the respective contract, and (b) contracts that were so challenged but fully settled against the contractor. Nonperformance shall not include contracts where Employers decision was overruled by the dispute resolution mechanism. Nonperformance must be based on all information on fully settled disputes or litigation, i.e., dispute or litigation that has been resolved in accordance with the dispute resolution mechanism under the respective contract and where all appeal instances available to the Bidder have been exhausted.</p><p>[2] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; This requirement also applies to contracts executed by the Bidder as JV member.</p><p>[3]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder shall provide accurate information on the related Letter of Bid about any litigation or arbitration resulting from contracts completed or ongoing under its execution over the last five years. A consistent history of awards against the Bidder or any member of a joint venture may result in failure of the Bid.</p><p>[4] The Employer may use this information to seek further information or clarifications in carrying out its due diligence.&nbsp;</p><p>[5] &nbsp;&nbsp; For contracts under which the Bidder participated as a joint venture member or sub-contractor, only the Bidder&rsquo;s share, by value, shall be considered to meet this requirement</p><p>[6] &nbsp;&nbsp;&nbsp;&nbsp; Substantial completion shall be based on 80% or more Plant and installation completed under the contract.</p><p>[7] &nbsp;&nbsp;&nbsp;&nbsp; In the case of JV, the value of contracts completed by its members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been met. Instead, each contract performed by each member shall satisfy the minimum value of a single contract as required for single entity. In determining whether the JV meets the requirement of total number of contracts, only the number of contracts completed by all members each of value equal or more than the minimum value required shall be aggregated.</p><p>[8] In the case of JV, the value of contracts completed by its members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been met. Instead, each contract performed by each member shall satisfy the minimum value of a single contract as required for single entity. In determining whether the JV meets the requirement of total number of contracts, only the number of contracts completed by all members each of value equal or more than the minimum value required shall be aggregated.</p><p>[9] &nbsp;&nbsp;&nbsp;&nbsp; For the avoidance of doubt, a sanctioned party&rsquo;s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.</p><p>[10] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.&nbsp;</p><p>[11] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inspections in this context usually are investigative (i.e., forensic) in nature.&nbsp; They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms.&nbsp; Such activity includes but is not limited to: accessing and examining a firm&#39;s or individual&#39;s financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.</p><p>&nbsp;</p><p>&nbsp;</p><p>[13] Costs shall be in the currencies of the Contract.</p><p>[14] Costs shall be in the currencies of the Contract.</p><p>2 Specify where necessary.</p><p>[15] &nbsp;&nbsp;&nbsp;&nbsp; For the avoidance of doubt, a sanctioned party&rsquo;s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.</p><p>[16] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.&nbsp;</p><p>[17] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inspections in this context usually are investigative (i.e., forensic) in nature.&nbsp; They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms.&nbsp; Such activity includes but is not limited to: accessing and examining a firm&#39;s or individual&#39;s financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.</p><p>[18]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <em>The Employer should insert either the Bank Guarantee or the Conditional Guarantee.</em></p><p>[19]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Guarantor shall insert an amount representing the percentage of the Contract Price specified in the Contract and denominated either in the currency(ies) of the Contract or a freely convertible currency acceptable to the <em>Employer</em>.</p><p>[20]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; This text shall be revised as and where necessary to take into account (i) partial acceptance of the Facilities in accordance with Sub-Clause 25.4 of the GCC; and (ii) extension of the Performance Security when the Contractor is liable for an extended warranty obligation pursuant to Sub-Clause 27.10 of the GCC (although in this latter case the <em>Employer</em> might want to consider an extended warranty security in lieu of the extension of the Performance Security).</p><p>[21]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Insert the date twenty-eight days after the expected expiration date of the Defect Liability Period. The Employer should note that in the event of an extension of the time for completion of the Contract, the Employer would need to request an extension of this guarantee from the Guarantor. Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Employer might consider adding the following text to the form, at the end of the penultimate paragraph: &ldquo;The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six months][one year], in response to the Employer&rsquo;s written request for such extension, such request to be presented to the Guarantor before the expiry of the guarantee.&rdquo;</p><p>&nbsp;</p><p>[22]<em>The Guarantor shall insert an amount representing the amount of the advance payment and denominated either in the currency(ies) of the advance payment as specified in the Contract, or in a freely convertible currency acceptable to the Employer.</em></p><p>[23]<em>Insert the expected expiration date of the Time for Completion.&nbsp; The Employer should note that in the event of an extension of the time for completion of the Contract, the Employer would need to request an extension of this guarantee from the Guarantor.&nbsp; Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Employer might consider adding the following text to the form, at the end of the penultimate paragraph:&nbsp; &ldquo;The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six months][one year], in response to the Beneficiary&rsquo;s</em><em> written request for such extension, such request to be presented to the Guarantor before the expiry of the guarantee.&rdquo;</em></p>"},{"id":"OP00463159","notice_type":"Request for Expression of Interest","noticedate":"18-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-03T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Albania","project_id":"P178715","project_name":"Climate Resilience and Agriculture Development Project","bid_reference_no":"AL-MARD-560551-CS-INDV","bid_description":"M&E Consultant of PMT","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Bulevardi Dëshmorët e Kombit Nr.2; Tiranë, Albania\nTel (off.): +355 4 2226243 - 75191","contact_ctry_name":"Albania","contact_email":"Arben.Molla@bujqesia.gov.al","contact_name":"Arben  Molla","contact_organization":"Ministry of Agriculture and Rural Development","contact_phone_no":"+355 69","contact_web_url":"www.bujqesia.gov.al","submission_date":"2026-08-18T00:00:00Z","notice_text":"<p>&nbsp;</p><p><strong>ALBANIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p><p><strong>(CONSULTING SERVICES)</strong></p><p><strong>Selection of Individual Consultant </strong></p><p><strong>Climate Resilience and Agriculture Development Project in Albania</strong></p><p><strong>Project ID Number:&nbsp; No.: P178715</strong></p><p><strong>IBRD Loan Number: </strong><strong>94890 </strong></p><p><strong>Assignment Title: &ldquo;M&amp;E Consultant of PMT&rdquo; &nbsp;</strong></p><p><strong>(Ref. No. AL-MARD-560551-CS-INDV)&rdquo;</strong></p><p><strong>The World Bank is assisting the Government of Albania (GoA) with the financing of the Climate Resilience and Agriculture Development project (CRAD). This project aims to increase competitiveness and climate resilience of priority agri-food value chains. The expected outputs from the project are: (i) increased supply/sales to local agri-food businesses, (ii) increased agricultural productivity and production, lower costs and extended production season (iii) improved traceability, farmer&rsquo;s market integration and the compliance with food safety and quality requirements, (iv) evidence-based decision making for resilience and sustainable agri-food systems. </strong></p><p><strong>The Project consists of the following components, which will support the project objective:</strong></p><ol><li><strong>Promoting Climate Smart Agriculture and Access to Markets</strong></li><li><strong>Enhancing Compliance with Food Safety and Quality Standards</strong></li><li><strong>Strengthening Evidence-based Analysis Capacity of MARD and Municipalities</strong></li></ol><p><strong>The services required to be contracted aim to support the Ministry of Agriculture and Rural Development (MARD) in ensuring successful implementation of the contract &ldquo;M&amp;E Consultant of PMT&rdquo;.</strong></p><p><strong>The Ministry of Agriculture and Rural Development (MARD) is the lead implementation agency for this Project (CRAD) and publishes this Request for Expression of Interest with the aim of selecting an individual consultant as M&amp;E Consultant of PMT who will be part (a team member) of the PMT and he/she will support the PMT in monitring and evalution issue compliance in the implementation of Project activities.</strong></p><p><strong>Objective of the Consultancy and Scope of Work</strong></p><p><strong>The primary objective of the Monitoring and Evaluation (M&amp;E) Specialist consultancy is to support the effective implementation of the Climate Resilience and Agriculture Development Project by establishing and operationalizing robust monitoring and evaluation systems. The M&amp;E Specialist will ensure that project activities across all components are tracked, analyzed, and reported in alignment with the project&rsquo;s development objectives of increasing competitiveness and climate resilience of priority agri-food value chains. The role will contribute to evidence-based decision-making, facilitate adaptive management, and strengthen institutional capacity at the Ministry of Agriculture and Rural Development (MARD) and municipal levels, with a particular focus on stakeholder engagement and local context.</strong></p><p><strong>Key activities and responsibilities include:</strong></p><ol><li><strong>Develop and implement a comprehensive M&amp;E framework for the project, including clear indicators, data collection methodologies, and reporting protocols, in accordance with the project results framework and World Bank guidelines.</strong></li><li><strong>Coordinate and oversee the collection, validation, and analysis of quantitative and qualitative data related to project outputs, outcomes, and impacts across all components, including productivity improvements, irrigation and drainage upgrades, compliance with food safety standards, and institutional strengthening.</strong></li><li><strong>Support the MARD and municipalities in building capacity for consistent and comprehensive data collection, management, and analysis, ensuring integration of gender-disaggregated and beneficiary feedback indicators.</strong></li><li><strong>Facilitate participatory monitoring processes, including the establishment and engagement of local monitoring groups composed of farmers, agri-food businesses, and other stakeholders, to enhance transparency and accountability in project implementation.</strong></li><li><strong>Prepare periodic progress reports, evaluation summaries, and presentations for project management, government counterparts, and the World Bank, highlighting achievements, challenges, and recommendations for adaptive management.</strong></li><li><strong>Contribute to the preparation and review of project documentation required for compliance with environmental and social safeguards, including monitoring of citizen engagement activities and grievance redress mechanisms.</strong></li><li><strong>Provide technical support for scaling up digital tools such as the Irrigation and Drainage Management Information System (IDMIS) and GIS mapping, and ensure their effective use in monitoring project activities at municipal and central levels.</strong></li><li><strong>Liaise with local stakeholders, including beneficiaries, community representatives, and implementing agencies, to ensure timely and accurate information flow and promote inclusive participation in M&amp;E activities.</strong></li></ol><p><strong>This list of duties and responsibilities is not exhaustive, and the consultant may be required to perform other related tasks as assigned by the designated supervisor.</strong></p><p><strong>Required Experience and Qualifications</strong></p><p><strong>The Consultant shall possess the following qualifications and experience:</strong></p><ul><li><strong>At least a university degree, preferably a Master&#39;s degree, in Economics, Business Administration, Statistics, Public Administration, Agricultural and Rural Development, Social Sciences, or another relevant discipline.</strong></li><li><strong>A minimum of fifteen (15) years of overall professional experience.</strong></li><li><strong>At least seven (7) years of demonstrated experience in the design, implementation, monitoring, and evaluation of development projects and program in the field of agriculture, food safety and irrigation. </strong></li><li><strong>At least ten (10) years of professional experience working on projects financed by international development organizations, preferably in the agriculture and rural development sector.</strong></li><li><strong>Previous experience with World Bank-financed projects will be considered a strong advantage.</strong></li><li><strong>Demonstrated knowledge of results-based monitoring and evaluation methodologies and data analysis techniques.</strong></li><li><strong>Excellent analytical, report writing, and presentation skills.</strong></li><li><strong>Excellent command of written and spoken Albanian and English.</strong></li><li><strong>Strong interpersonal, communication, and teamwork skills.</strong></li></ul><p><strong>Applicants that fulfill the minimum qualification requirements will be further evaluated based on the below <u>evaluation grid for the position:</u></strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#bfbfbf; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:414px\"><p><strong>Evaluated expertise</strong></p></td><td style=\"background-color:#bfbfbf; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:154px\"><p><strong>Points</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>General Experience</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>30</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Adequacy for the assignment </strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>60</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Language and computer skills</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>10</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Total</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong>The consultant will be selected based on Selection of Individual Consultant (IC) in accordance with the procedures set out in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Procurement in Investment Project Financing Goods, Works, Non-Consulting and Consulting Services July 2016 (revised November 2020).</strong></p><p><strong>The initial duration of the assignment is 12 months, with a probation period of 3 months, from contract signing and/or entry into force of the contract, with the option of renewal for the entire Project implementation period (38 months), based on satisfactory performance.&nbsp; The type of contract for this assignment is Time Based Contract.&nbsp; The Consultant M&amp;E expert shall be engaged on a full-time basis.</strong></p><p><strong>Interested local Consultants may obtain further information concerning the Terms of Reference at the official website of MARD:<em> </em>https://bujqesia.gov.al/projekti-qendrueshmeria-ndaj-klimes-dhe-zhvillimit-ne-bujqesi/<u>, </u>or at the address below, during office hours 08:00 to 16:30 (Monday to Thursday) and 08:00 to 14:00 on Friday.</strong></p><p><strong>The Ministry of Agriculture and Rural Development (MARD) invites interested individuals to indicate their interest in providing the services. Interested candidates should provide: (i) motivation letter, underlining their advantages concerning this position, (ii)&nbsp;&nbsp; Curriculum Vitae, as well as, (iii) information that indicates that the candidates have required qualifications to carry out the Consulting Services, and (iv) various references. </strong></p><p><strong>All documents should be submitted in English language.</strong></p><p><strong>Expressions of Interest (EoIs) must be delivered no later than <u>September 03, 2026</u> hardcopy (in person or by mail) to the address below, within office hours, and/or electronically at the below e-mail address. </strong></p><p>&nbsp;</p><p><strong>Ministry of Agriculture and Rural Development </strong></p><p><strong>Adr: Blv. &quot;D&euml;shmor&euml;t e Kombit&quot;, Nr. 2, 1001, Tirana, Albania</strong></p><p><strong>E-mail: arben.molla@bujqesia.gov.al </strong></p><p>&nbsp;</p><p><strong>Attn:&nbsp;&nbsp; Mr. Arben Molla</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Manager of PMT</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00463071","notice_type":"Request for Expression of Interest","noticedate":"18-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-03T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia, Federal Republic of","project_id":"P508408","project_name":"Bulsho: Strengthening Community and Local Institutions for Social Cohesion, Inclusion, and Resilienc","bid_reference_no":"SO-MOLGUD-567779-CS-INDV","bid_description":"Procurement Officer for Bulsho Project-Somaliland Project Implementation Unit (PIU)","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Near the Presidential Palace, behind the Ministry of Livestock, Hargeisa, Somaliland.","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"bulsho.somaliland@outlook.com","contact_name":"Mohamoud Hussein","contact_organization":"Ministry of Local Governments and Urban Development","contact_phone_no":"+252634420527","submission_date":"2026-08-18T00:00:00Z","notice_text":"<p><strong>GOVERNMENT OF SOMALILAND</strong></p><p><strong>MINISTRY OF LOCAL GOVERNMENT AND URBAN DEVELOPMENT (MoLGUD)</strong></p><p>REQUEST FOR EXPRESSION OF INTEREST (REOI)</p><p>INDIVIDUAL CONSULTANT SELECTION</p><p><strong>Country:</strong> Somaliland<br /><strong>Project ID:</strong> P508408<br /><strong>Project Name:</strong> Bulsho Project &ndash; Strengthening Community Institutions for Social Cohesion, Inclusion and Resilience<br /><strong>Consulting Service:</strong> PIU Bulsho Procurement Officer<br /><strong>Selection Type:</strong> Individual Consultant</p><p><strong>Reference No: SO-MOLGUD-567779-CS-INDV</strong><br /><strong>Duty Station:</strong> Hargeisa, Somaliland, with potential travel to the target districts and cities of the Bulsho Project<br /><strong>Duration:</strong> 12 months, renewable subject to satisfactory performance<br /><strong>Application Deadline:</strong> September 3, 2026, at 4:00 PM Hargeisa Time</p><p>1. BACKGROUND</p><p>The Ministry of Local Government and Urban Development (MoLGUD) of the Government of Somaliland is implementing the World Bank-financed Bulsho Project &ndash; Strengthening Community Institutions for Social Cohesion, Inclusion and Resilience (P508408).</p><p>The main objective of the Bulsho Program is to strengthen community and local institutions for improved social cohesion, inclusion, and resilience. The Program places citizens and communities at the center of governance and focuses on strengthening service delivery systems, reinforcing the social contract between citizens and government, and promoting participatory and inclusive local governance.</p><p>To support implementation of the Bulsho Project, the Government of Somaliland, through MoLGUD, intends to recruit a qualified and experienced Procurement Officer as part of the Project Implementation Unit (PIU).</p><p>2. SCOPE OF THE ASSIGNMENT</p><p>The PIU Bulsho Procurement Officer will be responsible for developing and implementing an effective and cost-efficient procurement management system for the Bulsho Project in accordance with the World Bank Procurement Regulations, applicable Government procedures, the Project Operations Manual (POM), and other relevant project requirements.</p><p>The Procurement Officer will coordinate and support procurement planning and implementation; preparation and processing of procurement documents; bid/proposal evaluation and contract award processes; contract management; procurement compliance, monitoring and reporting; community-level procurement; procurement capacity building; and maintenance of procurement records and systems, including the Systematic Tracking of Exchanges in Procurement (STEP).</p><p><strong>The detailed scope of services, responsibilities, deliverables, reporting arrangements, and other requirements are provided in the attached Terms of Reference (TOR).</strong></p><p>3. QUALIFICATIONS AND EXPERIENCE</p><p>The successful candidate shall meet the following minimum qualifications and experience:</p><ul><li>A university degree from an accredited university in Procurement and Supply Chain Management, Business Administration, Accounting, Finance, or an equivalent relevant discipline.</li><li>A minimum of six (6) years of directly relevant professional experience, including broad experience in the management of procurement in the public or private sector.</li><li>A minimum of four (4) years of experience implementing procurement activities in accordance with the procurement guidelines and procedures of international organizations, such as the World Bank, African Development Bank, United Nations, INGOs, or similar development partners, particularly in the procurement of goods and services.</li><li>Demonstrated interpersonal skills and ability to work effectively in a team environment.</li><li>Knowledge and understanding of project planning and implementation.</li><li>High standards of reliability, integrity, ethical conduct, and professional accountability.</li><li>Strong communication and representation skills and demonstrated ability to work effectively in multicultural and challenging environments.</li><li>Excellent computer skills, particularly in Microsoft Word, Excel, PowerPoint, and internet-based applications.</li><li>Knowledge of Somaliland&rsquo;s public financial management laws and regulations.</li><li>Knowledge of World Bank and/or other development partner procurement standards and requirements.</li><li>Strong working knowledge of written and spoken English.</li></ul><p>&nbsp;</p><p>4. REPORTING AND DURATION</p><p>The PIU Bulsho Procurement Officer will report to the Bulsho Project Manager.</p><p>The assignment will initially be for 12 months and may be renewed subject to satisfactory performance and project requirements. The duty station is Hargeisa, Somaliland, with potential travel to the target districts and cities of the Bulsho Project.</p><p>5. SELECTION METHOD</p><p>The Ministry of Local Government and Urban Development (MoLGUD), Government of Somaliland, now invites eligible and qualified Individual Consultants to indicate their interest in providing the above-mentioned services.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers: Procurement in Investment Project Financing &ndash; Goods, Works, Non-Consulting and Consulting Services, July 2016, revised November 2017, August 2018, November 2020 and September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>A Consultant will be selected in accordance with the Individual Consultant Selection method set out in the World Bank Procurement Regulations and applicable Government of Somaliland policies.</p><p>6. SUBMISSION REQUIREMENTS</p><p>Interested Consultants should submit:</p><ol><li>A detailed and updated Curriculum Vitae (CV), including contact details of three (3) professional referees;</li><li>Copies of relevant academic qualification certificates; and</li><li>A cover letter outlining the candidate&rsquo;s relevant experience, qualifications, and suitability for the assignment.</li></ol><p>Interested and qualified candidates should submit their applications by email with the subject line:</p><p><strong>&ldquo;Application for PIU Bulsho Procurement Officer &ndash; SO-MOLGUD-567779-CS-INDV&rdquo;</strong></p><p><strong>To:</strong> bulsho.somaliland@outlook.com<br /><strong>Cc:</strong> dg.molgud@sldgov.org</p><p>Applications must be received <strong>no later than September 3, 2026, at 4:00 PM Hargeisa Time</strong>.</p><p>Attention:</p><p><strong>PIU Bulsho Procurement Officer Recruitment</strong><br /><strong>Bulsho Project &ndash; Strengthening Community Institutions for Social Cohesion, Inclusion and Resilience</strong><br /><strong>Ministry of Local Government and Urban Development (MoLGUD)</strong><br /><strong>Government of Somaliland</strong><br /><strong>Hargeisa, Somaliland</strong></p><p><strong>The detailed Terms of Reference (TOR) for the assignment are attached to this REOI.</strong></p>"},{"id":"OP00461885","notice_type":"Request for Expression of Interest","noticedate":"17-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-31T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Armenia","project_id":"P504282","project_name":"Armenia Tourism and Regional Infrastructure Project","bid_reference_no":"TRIP-CS-01","bid_description":"Consultancy Service for PROJECT PERFORMANCE MONITORING & EVALUATION","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Ulnetsi 31, Yerevan","contact_ctry_name":"Armenia","contact_email":"s.grigoryan@atdf.am","contact_name":"Silva Grigoryan","contact_organization":"Armenian Territorial Development Fund","contact_phone_no":"(060) 50-15-60 +140","contact_web_url":"www.atdf.am","submission_date":"2026-08-17T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p>Republic of Armenia</p><p>Tourism and Regional Infrastructure Project (TRIP)</p><p>Loan No: <strong>IBRD-98090</strong></p><p><strong>Assignment Title: </strong><strong>Consultancy Service for project performance Monitoring &amp; Evaluation</strong></p><p><strong>Reference No</strong>. (as per Procurement Plan):<strong> </strong><strong>TRIP-CS-01</strong></p><p><strong>17</strong><strong>&nbsp;</strong><strong>August, 2026</strong></p><p>The Republic of Armenia has received financing from the World Bank toward the cost of the Tourism and Regional Infrastructure Project (TRIP), and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include supporting ATDF in establishing and implementing a practical and reliable Monitoring and Evaluation (M&amp;E) system for the Project, enabling systematic tracking of project implementation progress, measurement of results and outcomes, and timely reporting against the Project Results Framework.</p><p>Specifically, the Consultant will:</p><ul><li>Operationalize the existing Results Framework (presented in Annex 1);</li><li>Update and validate baseline data where needed;</li><li>Develop and implement a fit-for-purpose M&amp;E methodology;</li><li>Conduct data collection, analysis, and reporting;</li></ul><p>The anticipated date of contract signing is May 2027. The expected completion date of the assignment August, 2030.</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>&nbsp;</p><p>The Armenian Territorial Development Fund (ATDF) now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>The shortlisting criteria are:</strong></p><p><em>(Experience during the last five (5) years)</em></p><ul><li>Experience in the development, implementation and/or operation of Monitoring and Evaluation (M&amp;E) systems.</li><li>Experience in planning and conducting baseline and status quo assessments, socio-economic and/or tourism sector studies, including data collection, analysis, and preparation of analytical reports.</li><li>Experience in designing and implementing quantitative and qualitative research, including survey design, sampling methodologies, and data analysis.</li><li>Experience in conducting similar studies in the regions (marzes) of the Republic of Armenia.</li><li>Experience in developing and/or implementing digital monitoring platforms (M&amp;E databases/dashboards) or digital results management tools under at least one (1) project.</li></ul><p>* The Consultant shall provide information on contracts completed by the firm, including the name of the Client, contract value, and a brief description of the services provided.</p><p>&nbsp;Key Experts will not be evaluated at the shortlisting stage.</p><p>The shortlist will contain five (5) to eight (8) firms.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the <strong>Quality and Cost-Based Selection</strong> <strong>(QCBS)</strong> method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours from <strong>09:00 to 17:00 (Yerevan time).</strong></p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by e-mail) by <strong>August 31, 2026.</strong></p><p>Armenian Territorial Development Fund</p><p>Procurement department</p><p>K. Ulnetsi st. 31bld</p><p>Yerevan 0037, Armenia</p><p>Tel: (+374 60) 50-15-60 +140</p><p>E-mail: <strong>procurementatdf2026@gmail.com</strong><strong><u>, </u></strong><strong><u>m</u></strong><strong><u>.grigoryan@atdf.am</u></strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Tourism and Regional Infrastructure Project</strong></p><p><strong>Consultancy Service for</strong></p><p><strong>PROJECT PERFORMANCE MONITORING &amp; EVALUATION</strong></p><p><strong>TRIP-CS-01</strong></p><p>The Tourism and Regional Infrastructure Project (Project)&nbsp;aims&nbsp;to boost Armenia&#39;s tourism potential through targeted infrastructure and soft investments in&nbsp;several&nbsp;regions. It will support seven (Areni, Yeghegis, Jermuk, Dvin, Gyumri, Dilijan, Goris) of the twenty identified tourism clusters, focusing on wine, wellness, adventure, culture, education, and ecotourism across Ararat, Vayots&nbsp;Dzor, Shirak, Aragatsotn Tavush, and Syunik regions. The Project will improve connectivity to the Clusters and enhance tourism site infrastructure. It also&nbsp;seeks&nbsp;to elevate Armenia&rsquo;s natural assets and human resources, improving business and professional skills in nearby communities to maximize the job creation. Additionally, Project aligns with the World Bank&rsquo;s approach to attracting private investment in these tourism clusters.</p><p>Project development objective (PDO) is to improve access to climate-resilient infrastructure and increase tourism contribution to the local economy of project-supported clusters in Armenia.</p><p><strong>Section 2. Objective of the assignment</strong></p><p>The objective of this assignment is to support ATDF in establishing and implementing a practical and reliable Monitoring and Evaluation (M&amp;E) system for the Project, enabling systematic tracking of project implementation progress, measurement of results and outcomes, and timely reporting against the Project Results Framework.</p><p>Specifically, the Consultant will:</p><ul><li>Operationalize the existing Results Framework (presented in Annex 1);</li><li>Update and validate baseline data where needed;</li><li>Develop and implement a fit-for-purpose M&amp;E methodology;</li><li>Conduct data collection, analysis, and reporting;</li></ul><p><strong>Section 3. Scope of Work</strong></p><p><strong>Task 1: </strong><strong>Operationalization</strong><strong> of Existing M&amp;E Framework (Status Update)</strong></p><p>The Consultant shall:</p><ul><li>Review existing Results Framework, M&amp;E arrangements, indicators, and reporting practices developed under the previous Project (Local Economy and Infrastructure Development Project) and propose changes in the methodology for TRIP.;</li><li>Update and validate baseline data using available sources;</li><li>Develop and document proposed measurement approaches for each indicator, including data sources, collection methods, frequency, responsibilities, and data verification procedures;</li><li>Provide recommendations to strengthen the operationalization and implementation of the Project M&amp;E system, including measures to improve data quality, consistency, and reporting.</li></ul><p><strong>Task 2: Status quo analysis.</strong><strong> </strong></p><p>Prior to Implementation of the Civil works in the target locations the Consultant shall analyze and assess the number of visitors to a given site (subproject) through analyzing formal visitations (e.g. tickets, etc.), hotels, B&amp;Bs, etc. of 2023-2026 years, and other informal means, as well as some qualitative assessment, e.g. view of the quality of infrastructure, site offerings, etc. Consultant shall also:</p><ul><li>Establish baseline values for all PDO and Intermediate Results indicators;</li><li>Develop indicator measurement protocols, including calculation formulas, data sources, verification procedures, treatment of missing data, and responsibilities for data collection and validation;</li><li>Conduct mapping and profiling of tourism-related enterprises and tourism value-chain actors in project-supported clusters.</li></ul><p><strong>Task 3: M&amp;E Methodology and Development</strong></p><p>The Consultant shall develop a practical and implementable M&amp;E methodology, including:</p><ul><li>Indicator reference sheets (definitions, data sources, data disaggregation;</li><li>Data collection methods and sources (surveys, administrative data, other secondary sources);</li><li>Surveys methodologies, including data collection tools and sampling approach (proportionate and feasible);</li><li>Data quality assurance procedures, including identification of limitations related to data availability, response rate, attribution of results, and seasonal variability, and proposed mitigation measures</li><li>Description of the organization and implementation of the field works;</li><li>Data management and storage protocols;</li><li>Reporting templates (quarterly, annual, final).</li></ul><p>The M&amp;E Methodology should include a data collection calendar that allows for counting seasonality, provides guidelines for interviewers on how to conduct surveys in the field and develops survey instruments that are in line with international standards. It also should specify data imputation, parameter estimation methodologies and determine the structure of periodic Results Reports.</p><p>M&amp;E Methodology should be based on all selected regions, a parallel analysis of the project&rsquo;s impacts in the context of tourism development throughout Armenia would be of special interest; in particular, analysis of historical trends (before, during and after the project) of specific tourism indicators at the national level and for different regions.</p><p><strong>Task 3: Pilot Testing and Initial Implementation</strong></p><p>The Consultant shall:</p><ul><li>Design and pilot data collection tools (e.g., visitor surveys, business surveys);</li><li>Conduct pilot data collection in selected clusters;</li><li>Refine tools and methodology based on pilot results;</li><li>Support initial round of data collection.</li></ul><p><strong>Task 4: </strong><strong>Design and Development of a Digital M&amp;E System</strong></p><p>The Consultant shall:</p><ul><li>Design and develop a digital M&amp;E database and indicator tracking solution to support systematic collection, storage, management, and monitoring of project results;</li><li>Develop an interactive dashboard solution (preferably Power BI or equivalent) for tracking, analysis, visualization, and reporting of Project Results Framework indicators, including disaggregation and progress against targets, where applicable; Develop database architecture, data entry templates, user roles, access protocols, and data management procedures to support the long-term operation and sustainability of the M&amp;E system;</li><li>Prepare user guidance materials, operating procedures, and technical documentation for the database and dashboard solution;</li><li>Prepare training and capacity building plan and deliver training and capacity-building sessions for ATDF designated project staff on the use, administration, maintenance, and updating of the M&amp;E database and dashboard tools;</li><li>Support pilot operation, testing, and refinement of the digital M&amp;E system prior to its final handover.</li></ul><p><strong>Task 5: </strong><strong>Reporting and </strong><strong>Results Assessment</strong><strong> </strong></p><p>The Consultant shall:</p><ul><li>Produce periodic M&amp;E reports (quarterly and annual);</li><li>Analyze progress toward PDO and Intermediate Results indicators, identify trends, implementation challenges, and emerging risks;</li><li>Prepare a Final Results Report.</li></ul><p><strong>Section 4. Deliverables</strong></p><p>The Consultant shall deliver the following outputs. All deliverables shall be submitted in <strong>English and Armenian</strong>, in <strong>electronic (editable MS Word/Excel formats)</strong>, and, where required, <strong>two (2) hard copies</strong>.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:64px; vertical-align:top; width:640px\"><p><strong>4.1. Inception Report (Month 1) </strong></p><p><strong>Indicative length:</strong> 15&ndash;20 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Detailed work plan and implementation schedule (Gantt chart);</li><li>Refined understanding of assignment objectives and scope;</li><li>Proposed M&amp;E methodological approach (high-level);</li><li>Mapping of available data sources and stakeholders;</li><li>Risks, assumptions, and mitigation measures;</li><li>Detailed structure of all subsequent deliverables;</li></ul><p><strong>Annexes:</strong></p><ul><li>Draft survey tools (visitor, business, beneficiary);</li><li>Draft indicator reference sheet template;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.2. Status Update Report (Month 2) </strong></p><p><strong>Indicative length: </strong>20 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Review of existing indicators and definitions;</li><li>Updated/validated baseline values (based on available data);</li><li>Identification of data gaps, inconsistencies, and limitations;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.3. Status Quo Analysis Report (For each Cluster prior to the commencement of construction works)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li><strong>Review of baseline information available in the approved Cluster Development Plans (CDPs), feasibility studies, design documentation, official statistics, and other relevant sources supporting the Project Results Framework;</strong></li><li><strong>Assessment of visitor numbers and tourism flows for the period 2023&ndash;2026 using available administrative, statistical, and other relevant data sources;</strong></li><li><strong>Collection of additional baseline information only where existing data are insufficient to establish baseline values or measure the indicators included in the approved Project Results Framework;</strong></li><li><strong>Compilation of baseline values for PDO and Intermediate Results indicators in accordance with the approved Results Framework;</strong></li><li><strong>Identification of data gaps, limitations, and recommendations for future data collection and monitoring;</strong></li><li><strong>Preparation of baseline datasets and supporting documentation for subsequent project monitoring.</strong></li></ul><p><strong>Outputs:</strong></p><p>&bull; Status Quo Analysis Report for each target location/subproject;<br />&bull; Baseline dataset and supporting data tables.<br />&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.4. M&amp;E Methodology and Toolkit (Month 8)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Indicator Reference Sheets (definition, unit, baseline, target, data source);</li><li>Indicator Measurement Protocols for all PDO and Intermediate Results indicators;</li><li>Outcome and impact assessment methodology.</li><li>Data collection methodologies:</li></ul><ul><li>Surveys (visitor, enterprise, beneficiary)</li><li>Administrative and secondary data;</li></ul><ul><li>Sampling approach;</li><li>Data quality assurance and validation procedures;</li><li>Data management and storage protocols, including ethical standards and data privacy protection procedures;</li><li>Reporting framework and standardized templates;</li><li>Data collection calendar (including seasonality considerations).</li></ul><p><strong>Mandatory Annexes:</strong></p><ul><li>Survey questionnaires;</li><li>Data entry and database templates (Excel or compatible);</li><li>Reporting templates (quarterly, annual).</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.5. Pilot Testing and Initial Implementation Report (Month 8)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Description of pilot implementation (locations, sample size, tools used);</li><li>Results of pilot data collection;</li><li>Identified methodological and operational issues;</li><li>Adjustments made to tools and methodology;</li><li>Finalized data collection instruments and procedures;</li></ul><p><strong>Outputs:</strong></p><ul><li>Revised/final survey instruments and data collection protocols;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.6. Digital M&amp;E System and Dashboard Package (Month 6)</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Outputs</strong></p><ul><li>Operational digital M&amp;E database;</li><li>Interactive dashboard with user access levels;</li><li>Data entry manual;</li><li>System administration manual;</li><li>Training plan and training materials;</li><li>Training sessions based on the agreed training plan.</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.7. Periodic M&amp;E Reports (Quarterly and Annual)</strong></p><p><strong>Indicative length:</strong> 30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Progress against intermediate indicators;</li><li>Analysis of trends and performance;</li><li>Key findings and interpretation of results;</li><li>Identification of implementation challenges and risks;</li><li>Recommendations for corrective actions;</li></ul><p><strong>Format requirements:</strong></p><ul><li>Executive summary (max. 2&ndash;3 pages);</li><li>Main analytical narrative;</li><li>Visualizations (charts, graphs, tables);</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.8. Final Results Report (End of Assignment)</strong></p><p><strong>Indicative length: </strong>up to 80&ndash;100 pages</p><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Overall assessment of project performance against PDO;</li><li>Consolidated analysis of all indicators over time;</li><li>Assessment of project contribution to tourism development;</li><li>Economic analysis;</li><li>Lessons learned and good practices;</li><li>Strategic recommendations for future tourism sector monitoring and similar projects implementation;</li></ul><p><strong>Annexes:</strong></p><ul><li>Indicator time-series tables;</li><li>Methodological notes.</li></ul></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 5. The composition of Consultant&rsquo;s team and qualifications are the following:</strong><strong> </strong></p><p><strong>Key 1 Team Leader</strong>: hold Master&rsquo;s degree with an emphasis on tourism research, monitoring and evaluation, with at least 5-7 years of similar experience in survey design and execution;</p><p><strong>Key 2 Economic and financial analysis expert</strong>: Bachelor&rsquo;s degree in Economics, Mathematics, Social Sciences or related field with at least 5 years of experience in data collection and analysis.</p><p><strong>Key 3 Performance evaluation specialist</strong>: Bachelor degree in tourism with at least 5 years of experience in data collection and analysis for tourism development. Willing to travel to remote &nbsp;communities and coordinate with team members on related projects;</p><p><strong>Key 4 Qualified Surveyors</strong> in related field with at least 3 years&rsquo; experience in similar M&amp;E assignments /4 specialist/.</p><p>&nbsp;</p><p><strong>Section </strong><strong>6</strong><strong>. Language</strong></p><p>The working language of the report is English and Armenian. All reports should be submitted in hard (2) and electronic copies in both languages.</p><p><strong>Section </strong><strong>7</strong><strong>. Duration</strong></p><p>The Contract shall be signed for an initial period of one (1) year. The Consultant shall be responsible for addressing the Client&rsquo;s comments and finalizing the deliverables until their formal acceptance by the Client. The Contract may be renewed annually, subject to satisfactory performance and the continuing needs of the Project.</p><p><strong>Section </strong><strong>8</strong><strong>. Implementation Arrangements </strong></p><p>The Consultant shall report directly to the ATDF. Close coordination will be required with Tourism Committee, National Statistical Committee (upon need), and other relevant stakeholders. Close coordination with ATDF technical team and construction contractors will also be required. The assignment is on an intermittent basis following the pace of the progress of civil works implementation in each of the selected regions.</p><p>&nbsp;</p><p><strong>Annex 1: Results Framework and Monitoring</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; height:1px; width:942px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Baseline</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 1</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 2</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 3</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 4</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:166px\"><p>Closing Period</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Improve access to climate-resilient infrastructure </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>People benefiting from climate resilient infrastructure (Number of people) CRI </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>532,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>585,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>635,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>810,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>930,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>People benefiting from climate resilient infrastructure - Female (Number of people) CRI</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>212,800</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>234,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>254,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>324,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>372,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>People benefiting from climate resilient infrastructure - Youth (Number of people) CRI</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>159,600</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>175,500</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>190,500</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>243,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>279,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Increase tourism contribution to the local economy of project-supported clusters </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Number of beneficiaries employed (Number of people) CRI </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>300</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>600</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>800</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>Number of beneficiaries employed - Female (Number of people)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>40</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>120</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>240</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>320</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Average tourism spending in project-supported clusters (Amount(USD)) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>120</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>130</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>140</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>150</p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; width:942px\"><p><strong>Intermediate Indicators by Components</strong></p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; height:1px; width:942px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Baseline</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 1</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 2</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 3</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 4</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:166px\"><p>Closing Period</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Fostering Integrated and Sustainable Cluster Development </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Cluster Development Plans completed and approved (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Destination management organizations in the project clusters (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>4</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Management plans developed for museums, cultural and natural heritage sites (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Visitors to project supported clusters (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>500,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>525,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>550,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>600,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>700,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>750,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Businesses within the tourism value chain benefitting from project activities (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>30</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Formal women-led business created and/or strengthened in tourism-related sectors as a result of project interventions (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>25</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>35</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Supporting climate-resilient infrastructure and promoting private sector participation </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Women in decision-making roles in the Local Working Groups (LWGs) as a result of project interventions (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>30</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Kilometers of roads rehabilitated (Kilometers) (Kilometers) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>10</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Improved illumination by quantity of LED luminaries (roads/streets/walkways) (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>50</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>150</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>250</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>400</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>500</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Public-Private Partnership projects reaching commercial close (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>1</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Museums and cultural facilities constructed / refurbished (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Public spaces and parks rehabilitated/upgraded (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>8</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Tourism facilities rehabilitated/constructed (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>8</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Program Management and Operational Support </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Project beneficiaries that report that the Project investments reflected their needs (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Jan/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>70</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>of which, female (Percentage)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Jan/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>35</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Grievances registered and addressed within the FGRM timeframe (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>80</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Contingent Emergency Response Component (CERC) </strong></p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; width:1520px\"><p><strong>Monitoring &amp; Evaluation Plan: </strong><strong>PDO Indicators by PDO Outcomes</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:4px; width:677px\"><p><strong>Improve access to climate-resilient infrastructure</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>People benefiting from climate resilient infrastructure (Number of people) CRI</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>This indicator will measure the number of people (gender and youth disaggregated), such as locals, domestic and international visitors, that will benefit from investments supported by the project that will apply more climate smart and resilient practices during the intervention period.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>Increase tourism contribution to the local economy of project supported clusters</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:677px\"><p><strong>Average tourism spending in Project-supported clusters (amount (USD))</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>The average amount spent by a tourist (international / domestic) for the acquisition of consumption goods and services, as well as valuables, for own use, or to give away, during the visit to a project supported cluster. It includes expenditures by the tourists, as well as expenses that are paid for or reimbursed by others.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>Number of beneficiaries employed (Number) CRI</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>The aggregate number of people who have gained employment as a direct or indirect result of project activities (gender disaggregated). This includes the temporary jobs (works under a fixed-term contract) created during civil works as well as permanent jobs (works under a contract with no end date) created from project interventions that enhance the potential for individuals to obtain new jobs in the tourism sector within the project supported clusters e.g. through investments in human capital and skills (supply side), and/or promoting growth of firms and employment opportunities in the private sector (demand side).</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>ATDF</p></td></tr></tbody></table><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; vertical-align:top; width:1520px\"><p>&nbsp;</p><p>&nbsp;</p><p><strong>Monitoring &amp; Evaluation Plan: Intermediate Results Indicators by Components</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; height:29px; width:1520px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:4px; width:680px\"><p><strong>Fostering Integrated and Sustainable Cluster Development</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Cluster development plans completed and approved (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of cluster development plans (Dilijan, Goris, Yeghegis, Jermuk, Dvin), developed by the project and adopted by the Government. Adoption refers to formal approval by the Project Steering Committee. The MoE will be responsible for submitting the final CDPs for approval by the Project Steering Committee and for documenting in the meeting minutes the approval of the CDP(s) as evidence for monitoring purposes.&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Project Steering Committee minutes of meetings</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The approval of the CDPs will be captured in the meeting minutes. ATDF will report periodically on the status of CDPs through progress reports.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Destination management organizations supported in the project clusters (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of established and functioning destination management organizations (Areni, Dilijan, Jermuk and Yeghegis), as defined by the corresponding sublegal act under the Tourism Law, in the project area that have been established and/or benefitted from support through the project.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:17px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:17px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Letter provided by the MoE</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Reported by&nbsp; MoE</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>MoE</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Management plans developed for museums, cultural and natural heritage sites (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of site management plans developed for museums, and cultural and natural heriatge sites in project supported areas. The management plans outline the effective use, preservation, and promotion of cultural and/or tourism assets, ensuring sustainable operations, maintenance, and visitor engagement, and as applicable climate resilience provisions.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Visitors to the project supported clusters (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of visitor arrivals (both domestic and international) to project supported clusters. The metric reflects the growing trends due to enhanced infrastructure, services, or marketing efforts aimed at boosting visitation in the designated clusters.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Biennial&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:24px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; width:501px\"><p>Surveys and analysis of secondary data conducted by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Businesses within the tourism value chain benefitting from project activities (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of businesses within the project clusters&rsquo; tourism value chain, as defined by UNWTO, that have gained direct benefits from project activities. These benefits can include increased revenue, improved services, access to new markets, capacity-building, or enhanced infrastructure.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Surveys conducted by ATDF&nbsp;&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Formal women-led business created and/or strengthened in tourism-related sectors as a result of project interventions (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>The number of legally registered businesses that are newly established or existing businesses that have demonstrably improved their operations, profitability, and/or sustainability (e.g. increased revenues, expanded operations, enhanced market access, improved financial management)&nbsp;as a result of project interventions. Woman-led refers to businesses whereby woman/women hold a majority ownership stake and/or a key leadership position such as Chief Executive Officer, Managing Director, etc.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#95b3d7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Supporting Climate-resilient Infrastructure and Enhancing Capacities</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Women in decision-making roles in the Local Working Groups (LWGs) as a result of project interventions (Percentage)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of women directly involved in Local Working Groups at the community level engaged throughout the preparation of CDPs and implementation of prioritized investments under the project.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Kilometers of roads rehabilitated (Kilometers)</strong><strong> </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The kilometers of all-season roads newly constructed or rehabilitated that are within a 500 meter range from project supported clusters. All rehabilitation works will consider and incorporate disaster and climate resilience measures in accordance with national standards and global best practice, such as proper route selection, applying weather-resistant materials to withstand extreme weather conditions, implementing slope stabilization measures, improving the drainage/culverts, as applicable.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Museums and cultural facilities constructed/refurbished (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of museums and cultural facilities that have been newly constructed or refurbished as a result of project interventions. This includes the resilient, energy efficient development or improvement of the infrastructure required to enhance the preservation, display, and accessibility of cultural assets, archeological artefacts, art for public engagement and tourism. All newly constructed facilitiies will adhere to energy efficiency standards equivalent to EDGE Level-1.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Improved illumination by quantity of LED luminaries (roads/streets/walkways) (Number) </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The indicator will measure the number of light emitting diode (LED) luminaries installed.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Public-Private Partnership projects reaching commercial close (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of Public-Private Partnership project/s that have benefitted from assessments, designs, and preparatory support through the Project and have finalized the contractual agreements between the public and private sector, allowing to move forward with implementation of the PPP. This stage will signify the completion of negotiations and the readiness to commence the investment project activities, and thus achievement of the target.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Public spaces and parks rehabilitated/upgraded&nbsp;(Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of rehabilitated or upgraded public areas, including parks and green spaces.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Tourism facilities rehabilitated/constructed (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of tourism facilities that have been rehabilitated or newly constructed as part of project activities. This includes climate and disaster resilient improvements or new developments to infrastructure such as visitor centers or other tourism-related amenities. Rehabilitation will prioritize improvements of energy efficiency, and all newly constructed buildings will adhere to energy efficiency standards to energy efficiency standards equivalent to EDGE Level-1.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#95b3d7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Program Management and Operational Support </strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Share of project beneficiaries that report that the project interventions reflected their needs (percentage) &nbsp;&nbsp; </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of project beneficiaries who report that the interventions made under the project align with their needs and priorities. This metric reflects the level of satisfaction and relevance of the project interventions in addressing the specific needs and expectations of the target communities or stakeholders.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Grievances registered and addressed within the FGRM timeframe (percentage)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of grievances registered related to Project activities addressed within Feedback and Grievance Redress Mechanism timeframe related to delivery of Project benefits addressed.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p>"}]}