{"rows":20,"os":"0","page":"1","total":"1422","procnotices":[{"id":"OP00475113","notice_type":"Request for Expression of Interest","noticedate":"14-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-14T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Western and Central Africa","project_id":"P178497","project_name":"Harmonizing and Improving Statistics in West and Central Africa - Series of Projects 1 (HISWACA - SO","bid_reference_no":"GM-GBOS - GAMBIA-573632-CS-INDV","bid_description":"Recruitment of an individual consultant to conduct Mid-Term review of the project performance","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Kanifing Institutional Layout, Serrekunda, Bakau New Town, Serrekunda, Gambie","contact_ctry_name":"Gambia, The","contact_email":"jannehuo97@gmail.com","contact_name":"Mohammed L Janneh","contact_organization":"Gambia Bureau of Statistics","contact_phone_no":"(00220)3998803","submission_date":"2026-10-14T00:00:00Z","notice_text":"<p>&nbsp;</p><p>Harmonizing and Improving Statistics in West and Central Africa <strong>(</strong>HISWACA)</p><p>Project Implementation Unit (PIU), C/o Gambia Bureau of Statistics,</p><p>Mansa Musa Faal Complex, Bijilo West Coast Region</p><p><strong>REQUEST FOR EXPRESSION OF INTEREST</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Individual Consultant for the Mid-Term Review</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100%\"><tbody><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; width:19%\"><p>Assignment title</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; width:80%\"><p>Individual Consultant for the Mid-Term Review of the HISWACA Project - The Gambia</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Project</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>Harmonizing and Improving Statistics in West and Central Africa - Series of Projects 1 (HISWACA-SOP1)</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Project ID</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>P178497</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Country financing</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>The Gambia: IDA Grant E1750 - US$30 million</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Client</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>Gambia Bureau of Statistics / HISWACA Project Implementation Team</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Consultant category</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>Individual consultant</p></td></tr><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:19%\"><p>Primary output</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:80%\"><p>A comprehensive, evidence-based and forward-looking Mid-Term Review Report, with proposed corrective measures, project changes where warranted, and an actionable implementation plan</p></td></tr></tbody></table><ol><li>Background and project context</li></ol><p>The HISWACA-SOP1 project was approved by the World Bank Board of Executive Directors on 11 May 2023. The operation covers eight participating countries and three regional organisations. Following additional financing for Guinea-Bissau, total project financing is US$464 million. The Gambia participates through IDA Grant E1750 in the amount of US$30 million.</p><p>The project seeks to enhance the quality, accessibility and production of regionally comparable statistics. It is intended to improve country statistical performance, regional harmonisation, data access and use, and modernisation of the statistical system. The regional approach supports coordination among National Statistics Offices and Ministries, Departments and Agencies responsible for statistics, while encouraging the use of harmonised methods, tools, modern technologies and new or alternative data sources.</p><p>The Project Development Objective is to improve country statistical performance, regional harmonisation, data access and use, and to enhance modernisation of the statistical system in participating countries.</p><ul><li><ol><li>The project is organised under four components:</li></ol></li><li>Component 1: Harmonisation and Production of Core Statistics using International Data Quality Standards. Activities support regional and continental statistical harmonisation and production of quality core economic, social, demographic, agricultural, climate, sectoral and subnational statistics.</li><li>Component 2: Statistical Modernisation, Institutional Reform, Human Capital, Data Accessibility and Use. This supports modern methods and organisations, institutional reforms, improved access and dissemination, data use, human capital development and the use of new data sources and advanced technologies.</li><li>Component 3: Construction, Upgrading and Modernisation of Physical Infrastructure. This strengthens physical, ICT and statistical infrastructure, equipment, software and working environments for statistical institutions.</li><li>Component 4: Project Management, Monitoring and Evaluation. This supports project management, monitoring of results and user satisfaction.</li></ul><ol><li>Rationale for the Mid-Term Review</li></ol><p>The Mid-Term Review is a critical assessment conducted at the midpoint of project implementation. It provides an opportunity to take stock of implementation progress, assess achievements and emerging results, identify challenges and lessons learned, and determine whether the project remains on track to achieve its intended objectives.</p><p>The overall Mid-Term Review process will be undertaken in two interrelated stages. The first stage will focus on preparatory work, evidence gathering, independent assessment, stakeholder consultations, identification of implementation challenges, and formulation of proposed corrective measures and project adjustments. The second stage will involve stakeholder validation and consideration of the findings, recommendations, and agreements arising from the preparatory stage.</p><p>The independent consultancy constitutes a key technical input into this process. The consultant will provide the evidence, analysis, findings, and recommendations required to inform stakeholder discussions and decisions during the validation and endorsement stage.</p><p>The review shall be forward-looking and shall identify practical measures required to improve project performance during the remaining implementation period. Where justified by evidence, the review may recommend adjustments to project design, implementation arrangements, the Results Framework, operational procedures, resource allocation, or other relevant project parameters.</p><ol><li>Purpose of the Consultancy</li></ol><p>The purpose of the consultancy is to independently assess the performance and implementation of the HISWACA Project in The Gambia at mid-term and produce a rigorous, evidence-based, forward-looking, and decision-oriented Mid-Term Review Report.</p><p>The consultant shall lead the technical assessment during the preparatory stage of the Mid-Term Review process and provide technical support during the validation and finalisation stage. The assignment shall take stock of implementation progress, assess achievements and emerging results, identify lessons learned, diagnose constraints and risks, evaluate the continued relevance and adequacy of project arrangements, and recommend corrective measures and a prioritised action plan for the remaining implementation period.</p><p>The consultant&rsquo;s findings and recommendations shall provide an objective technical basis for stakeholder validation, agreement on corrective actions, and consideration of any necessary revisions to relevant project instruments or implementation arrangements.</p><ol><li>Objectives of the Assignment</li></ol><ul><li>Assess progress toward achievement of the PDO and determine whether the PDO remains relevant and achievable.</li><li>Assess the appropriateness, measurability and continued validity of PDO and intermediate results indicators.</li><li>Take stock of implementation progress against planned activities, milestones, deliverables and expected results.</li><li>Assess progress by component and determine how component activities are contributing to the PDO.</li><li>Identify implementation successes, lessons learned and factors that have contributed to positive results.</li><li>Document implementation challenges, including anticipated and unforeseen constraints, delays and their effects on progress.</li><li>Assess the adequacy of project design, implementation plan, costs, timing and viability in relation to the project closing date.</li><li>Assess project management and implementation arrangements and whether the available mix of skills remains appropriate.</li><li>Assess procurement, financial management, environmental and social framework implementation, results monitoring, legal covenant compliance and project risks.</li><li>Recommend practical corrective measures, any justified project adjustments, and a time-bound action plan for the remaining implementation period.</li><li>Provide independent evidence and analysis to support the preparatory stage of the Mid-Term Review process.</li><li>Facilitate validation of the review findings and recommendations and incorporate agreed stakeholder comments into the Final Mid-Term Review Report.</li></ul><ol><li>Scope of Work</li></ol><p>The consultant shall undertake the assignment through two interrelated stages. Stage 1 shall comprise the preparatory, evidence-gathering, consultation, and analytical activities required to produce the Draft Mid-Term Review Report. Stage 2 shall comprise stakeholder validation, refinement of proposed corrective measures and project changes, incorporation of consolidated comments, and finalisation of the Mid-Term Review Report.</p><p>All findings shall be supported by verifiable evidence obtained through document review, project monitoring information, stakeholder consultations, and other appropriate sources. The report shall distinguish clearly among confirmed findings, identified evidence gaps, proposed corrective measures, and recommendations requiring consideration or approval by the appropriate authorities.</p><ul><li><ol><li>Project Development Objective and project description</li></ol></li><li>Assess progress toward achievement of the PDO.</li><li>Determine whether the PDO remains relevant and achievable in the current context.</li><li>Review whether the PDO indicators remain appropriate for measuring the intended results.<ol><li>Overall implementation status</li></ol></li><li>Assess overall implementation progress against expected results, planned milestones and deliverables.</li><li>Examine progress on intermediate outcomes and the contribution of component activities to the PDO.</li><li>Identify constraints, issues and delays, including effectiveness or other implementation delays where applicable.</li><li>Assess actions already identified or implemented to address constraints and whether those actions are succeeding.<ol><li>Progress by component</li></ol></li><li>Assess performance under each of the four project components and relevant subcomponents implemented in The Gambia.</li><li>Identify completed, ongoing, delayed or pending activities and explain the evidence-based implications for results.</li><li>Assess the relationship between expenditures, outputs, intermediate outcomes and anticipated PDO-level results.<ol><li>Adequacy of project design</li></ol></li><li>Assess whether the project components and their content, scope and sequencing remain adequate to achieve the PDO.</li><li>Identify any design elements requiring adjustment and provide a detailed rationale for proposed changes, including expected outputs and results.<ol><li>Adequacy of the implementation plan</li></ol></li><li>Assess whether the implementation plan remains valid in terms of content, costs and timing.</li><li>Assess the viability of completing planned activities within the remaining implementation period and before the closing date.</li><li>Where required, propose updates to costs, procurement planning, disbursement scheduling and implementation sequencing.<ol><li>Project management and implementation arrangements</li></ol></li><li>Assess whether internal implementation and management arrangements are functioning and remain appropriate.</li><li>Assess coordination, decision-making, oversight and the adequacy of the mix of skills available to the client and the World Bank project teams.</li><li>Recommend modifications to implementation or management arrangements where evidence demonstrates a need.<ol><li>Procurement</li></ol></li><li>Assess the status and timeliness of procurement implementation.</li><li>Identify procurement delays and their causes, including internal approval delays where present.</li><li>Assess the sufficiency, skills and training of procurement staff in World Bank procurement and contract-management procedures applicable to Investment Project Financing.</li><li>Recommend actions to address procurement constraints and support timely completion of planned transactions.<ol><li>Financial management</li></ol></li><li>Describe and assess financial planning, financial management arrangements and internal controls.</li><li>Assess funds absorption and identify any material disbursement lags and their causes.</li><li>Review the status of Interim Financial Reports, audits and other required financial reports, including any overdue submissions and corrective actions.</li><li>Recommend measures to strengthen financial management performance and address identified gaps.<ol><li>Environmental and Social Framework</li></ol></li><li>Assess monitoring and reporting against the Environmental and Social Commitment Plan, Stakeholder Engagement Plan and other applicable environmental and social instruments.</li><li>Assess whether the Grievance Redress Mechanism is in place and functioning.</li><li>Identify compliance gaps and recommend a practical action plan to address them.<ol><li>Results framework and monitoring</li></ol></li><li>Assess whether the Results Framework remains valid and whether indicators can be measured.</li><li>Review availability, quality and timeliness of monitoring data.</li><li>Assess whether M&amp;E arrangements are functioning and adequate.</li><li>Determine whether indicator definitions, baselines or targets should be revised, and provide an evidence-based justification for any recommendation.<ol><li>Legal covenants</li></ol></li><li>Review the legal covenants in the Financing Agreement and document each covenant, its due date and status at mid-term.</li><li>Identify any non-compliance or delayed compliance and recommend corrective action.<ol><li>Risks</li></ol></li><li>Assess whether country, sector, implementation or other relevant risks have changed.</li><li>Determine the implications of changed risks for project design and implementation.</li><li>Recommend revised risk-management measures and timing where required.<ol><li>Conclusions, lessons and proposed changes</li></ol></li><li>Synthesise the principal conclusions and lessons learned.</li><li>Confirm continued borrower commitment or identify implications where commitment requires attention.</li><li>Prepare a summary table of proposed changes, responsible parties, timing and follow-up arrangements.</li><li>Present a prioritised action plan for the remaining implementation period.</li></ul><ol><li>Review Questions</li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100%\"><tbody><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; width:18%\"><p><strong>Review area</strong></p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; width:81%\"><p><strong>Core question</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Relevance and results</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Is the PDO still relevant and achievable? Are the PDO and intermediate indicators appropriate and measurable? What progress has been made toward expected results?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Design</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Are the project components still adequate to achieve the PDO? Are any additions, deletions, restructuring or refinements required?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Implementation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>How does progress compare with the implementation plan? What has worked, what has not, and why? Is completion viable within the remaining period?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Management</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Are implementation and management arrangements effective and appropriate? Is the mix of skills adequate?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Fiduciary</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>What is the status of procurement, contract management, financial planning, controls, absorption, disbursement and reporting?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Environmental and social</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Are applicable commitments and instruments monitored and reported? Is the GRM operational?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Monitoring</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Is reliable monitoring data available? Are M&amp;E arrangements functioning? Should baselines, indicators or targets be revised?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Legal and risk</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>What is the status of legal covenant compliance? Have the risk context and risk ratings changed, and with what implications?</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Forward actions</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:81%\"><p>Which corrective measures, project changes and decisions are required, by whom and by when?</p></td></tr></tbody></table><ol><li>Methodology and Approach</li></ol><p>The consultant shall propose a detailed methodology in the Inception Report. The methodology shall be aligned with the two-stage structure of the assignment and shall be consultative, evidence-based, transparent, participatory, and focused on practical and actionable findings.</p><p><strong>Stage 1 methodology</strong></p><p>The preparatory and analytical stage shall include:</p><ul><li>A structured desk review of the Financing Agreement, project design documents, Project Operations Manual, Results Framework, implementation plans, progress reports, Implementation Support Mission reports and aide-memoires, procurement and financial management records, environmental and social instruments and reports, legal covenant records, risk information, and other relevant evidence made available for the review;</li><li>Consultations with relevant implementing partners, Ministries, Departments and Agencies, project personnel, oversight institutions, users of statistics, development partners, and other relevant stakeholders;</li><li>Assessment of planned versus actual implementation progress, outputs, intermediate results, expenditures, and anticipated PDO-level results;</li><li>Analysis of the Objectively Verifiable Indicators and other indicators contained in the Results Framework;</li><li>Review of whether project risks, assumptions, undertakings, and implementation conditions have changed;</li><li>Identification of emerging challenges, lessons learned, remedial measures, and any potential revisions to project arrangements or instruments;</li><li>Triangulation of documentary evidence, monitoring information, financial data, and stakeholder consultations; and</li><li>Clear documentation of evidence limitations and outstanding information gaps.</li></ul><p><strong>Stage 2 methodology</strong></p><p>The validation and finalisation stage shall include:</p><ul><li>Presentation of preliminary findings and recommendations to the client and relevant stakeholders;</li><li>Structured validation of the factual accuracy, feasibility, responsibility, sequencing, and timing of proposed actions;</li><li>Documentation of stakeholder comments, decisions, and areas of agreement or disagreement;</li><li>Preparation of a comment-response matrix;</li><li>Incorporation of relevant consolidated comments into the Final Mid-Term Review Report; and</li><li>Finalisation of the proposed corrective measures, project changes, and prioritised action plan.</li></ul><p>The consultant shall maintain independence of judgment throughout the assignment. Stakeholder validation shall verify evidence, improve the practicality of recommendations, and document agreed actions, but shall not compromise the independence of the consultant&rsquo;s findings.</p><ol><li>Expected Deliverables</li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100%\"><tbody><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:18%\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:55%\"><p><strong>Minimum content</strong></p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:26%\"><p><strong>Timing</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Inception report and work plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:55%\"><p>Understanding of the assignment; refined review questions; methodology; evidence and document requirements; consultation plan; analytical framework; report outline; work schedule; and quality-assurance approach.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:26%\"><p>Within first week of Contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Draft Mid-Term Review Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:55%\"><p>A complete draft covering all required sections, findings, conclusions, lessons, proposed changes and a prioritised action plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:26%\"><p>Within three weeks of contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Validation presentation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:55%\"><p>A concise presentation of findings, conclusions, proposed corrective measures, project changes and priority actions for stakeholder review.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:26%\"><p>During the fourth week following contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:18%\"><p>Final Mid-Term Review Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:55%\"><p>A revised, professionally edited report that addresses consolidated comments and includes all required annexes and actionable matrices.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:26%\"><p>Within five weeks of contract signing</p></td></tr></tbody></table><p>All deliverables shall be submitted within the timelines indicated above and shall be subject to review and formal acceptance by the client. The consultant shall incorporate consolidated comments received during the validation process into the Final Mid-Term Review Report.</p><ol><li>Payment Milestones</li></ol><p>Payments shall be made upon satisfactory completion, submission and formal acceptance of the corresponding deliverables by the client, in accordance with the consultancy contract. The proposed payment schedule is:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:666px\"><tbody><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:102px\"><p>Payment</p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:501px\"><p>Milestone and linked deliverable</p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; width:62px\"><p>Amount</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:102px\"><p>First payment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:501px\"><p>Upon satisfactory submission and acceptance of the Inception Report and Work Plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:62px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:102px\"><p>Second payment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:501px\"><p>Upon satisfactory submission and acceptance of the complete Draft Mid-Term Review Report and delivery of the validation presentation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:62px\"><p>40%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:102px\"><p>Final payment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:501px\"><p>Upon satisfactory submission and formal acceptance of the Final Mid-Term Review Report, including all required annexes, matrices and responses to consolidated comments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:62px\"><p>30%</p></td></tr></tbody></table><p>&nbsp;</p><p>Submission alone does not constitute acceptance. Each payment is conditional upon written confirmation that the relevant deliverable meets the requirements and quality standards of this Terms of Reference and the consultancy contract.</p><ol><li>&nbsp;Minimum Technical Qualifications and Experience</li></ol><p>The individual consultant should demonstrate qualifications and experience commensurate with the breadth and technical demands of the assignment. In particular, the consultant shall meet the following minimum requirements:</p><ul><li>An advanced university degree in statistics, economics, development studies, monitoring and evaluation, public policy, project management, finance, social sciences, or another field directly relevant to the assignment.</li><li>Demonstrated experience conducting mid-term reviews, evaluations or implementation assessments of complex development projects.</li><li>Strong knowledge of results-based management, project design, Results Frameworks, indicators, monitoring systems and corrective-action planning.</li><li>Ability to assess project implementation across technical, institutional, procurement, financial management, environmental and social, legal and risk dimensions.</li><li>Experience with statistical capacity development, official statistics, National Statistical Systems, data access and use, statistical modernisation or related fields would be a strong advantage.</li><li>Familiarity with World Bank-financed Investment Project Financing operations, including implementation, procurement, financial management, environmental and social, results monitoring and legal compliance requirements, would be an advantage.</li><li>Excellent analytical, consultation, facilitation, report-writing and presentation skills in English.</li><li>Demonstrated ability to translate complex evidence into clear, practical and prioritised recommendations.</li></ul><ol><li>&nbsp;Reporting, Coordination and Review Arrangements</li></ol><p>The consultant shall report to the client-designated authority and work closely with the HISWACA Project Implementation Team. The consultant shall coordinate document requests, consultations, validation and submission of deliverables through the designated focal point. Deliverables shall be subject to review and acceptance by the client in accordance with the contract.</p><p>The client shall facilitate reasonable access to available project documents and relevant stakeholders. The consultant shall consolidate and address comments in a transparent manner and shall provide a comment-response matrix with the final report if requested by the client.</p><ol><li>&nbsp;Duration, Assignment Stages and Work Plan</li></ol><p>The consultancy shall be undertaken over a period of forty-five (45) days, commencing from the effective date specified in the consultancy contract. The assignment shall be implemented through the following two interrelated stages, aligned with the overall Mid-Term Review process:</p><p><strong>Stage 1: Preparatory, Evidence-Gathering and Analytical Stage</strong></p><p>During the first stage, the consultant shall undertake the substantive technical work required for the independent Mid-Term Review. This stage shall include:</p><ul><li>Conducting a structured review of relevant project documents, including the Results Framework, implementation progress reports, Implementation Support Mission reports and aide-memoires, procurement and financial management records, environmental and social documents, and other relevant materials;</li><li>Consulting relevant government institutions, implementing partners, Ministries, Departments and Agencies, project personnel, data users, development partners, and other relevant stakeholders;</li><li>Assessing progress against the Project Development Objective, intermediate results indicators, planned outputs, component and subcomponent targets, implementation schedules, and available financial information;</li><li>Taking stock of the findings and recommendations arising from relevant government assessments, implementation support missions, and other project reviews;</li><li>Identifying implementation achievements, emerging challenges, changed risks and assumptions, lessons learned, and areas requiring corrective intervention;</li><li>Assessing whether the project remains on track to achieve its intended objectives and results;</li><li>Identifying and analysing any recommended changes to project parameters, implementation arrangements, the Project Operations Manual, or the Financing Agreement, where such changes are supported by the review findings;</li><li>Preparing the Inception Report and Work Plan; and</li><li>Preparing and submitting the Draft Mid-Term Review Report, including findings, conclusions, lessons learned, proposed corrective measures, recommended project changes, and a prioritised action plan.</li></ul><p>The first stage shall culminate in the submission of the Draft Mid-Term Review Report for review by the client and relevant stakeholders.</p><p><strong>Stage 2: Validation, Finalisation and Endorsement Support Stage</strong></p><p>The second stage shall focus on validating the findings and recommendations developed during the preparatory stage and finalising the Mid-Term Review Report. During this stage, the consultant shall:</p><ul><li>Prepare and deliver a concise validation presentation covering the principal findings, conclusions, lessons learned, proposed corrective measures, recommended project changes, and priority actions;</li><li>Present the findings and recommendations to the client and relevant stakeholders at a validation workshop or meeting;</li><li>Facilitate technical discussion of the findings and document the comments, decisions, and agreements arising from the validation process;</li><li>Review the implications of stakeholder feedback for the proposed corrective measures, implementation arrangements, Project Operations Manual, Financing Agreement, Results Framework, targets, risks, and action plan, as applicable;</li><li>Incorporate relevant consolidated comments and agreed revisions into the report;</li><li>Prepare a comment-response matrix showing how substantive comments have been addressed; and</li><li>Submit the Final Mid-Term Review Report, including all required annexes, matrices, proposed changes, and the final prioritised action plan.</li></ul><p>The second stage shall culminate in the submission and formal acceptance of the Final Mid-Term Review Report.</p><p><strong>Indicative Work Plan and Deliverable Schedule</strong></p><p>The consultant shall submit, as part of the Inception Report, a detailed and realistic work plan covering the full 45-day assignment period. The work plan shall clearly indicate the sequencing, duration, and interdependence of activities under the two stages.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\"><tbody><tr><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:162px\"><p><strong>Assignment stage</strong></p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:323px\"><p><strong>Key deliverable</strong></p></td><td style=\"background-color:#8db3e2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:139px\"><p><strong>Timing</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:162px\"><p>Stage 1: Preparatory and analytical stage</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:323px\"><p>Inception Report and Work Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:139px\"><p>Within one week of contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:162px\"><p>Stage 1: Preparatory and analytical stage</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:323px\"><p>Draft Mid-Term Review Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:139px\"><p>Within three weeks of contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:162px\"><p>Stage 2: Validation and finalisation stage</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:323px\"><p>Validation Presentation and stakeholder validation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:139px\"><p>During the fourth week following contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:162px\"><p>Stage 2: Validation and finalisation stage</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:323px\"><p>Final Mid-Term Review Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:139px\"><p>Within five weeks of contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:162px\"><p>Contract close-out</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:323px\"><p>Final corrections, completion of the comment-response matrix, submission of editable source files, and formal acceptance of all outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:139px\"><p>Within the overall 45-day assignment period</p></td></tr></tbody></table><p>All deliverables shall be submitted within the timelines specified above and shall be subject to review and formal acceptance by the client. The consultant shall incorporate relevant consolidated comments received during the validation process before submitting the Final Mid-Term Review Report.</p><ol><li>Quality Standards and Acceptance Criteria</li></ol><ul><li>Completeness: all scope areas and required report sections are addressed.</li><li>Evidence: findings are based on reviewed documentation, monitoring information or stakeholder consultations and are clearly traceable.</li><li>Analytical rigor: the report explains progress, gaps, causes, implications and corrective options rather than merely listing activities.</li><li>Consistency: conclusions and recommendations follow logically from findings.</li><li>Actionability: proposed actions identify priorities, responsibilities, timing and intended results.</li><li>Clarity: the report is concise, well structured, professionally edited and suitable for decision-making.</li><li>Forward focus: the review provides practical solutions and justified project changes needed to support successful implementation.</li></ul><ol><li>&nbsp;Confidentiality, Independence and Ownership</li></ol><p>The consultant shall treat project documents and information received during the assignment as confidential and shall use them solely for the purposes of the consultancy. The consultant shall disclose any actual or potential conflict of interest and maintain professional independence and objectivity. All reports, matrices, presentations and other outputs produced under the assignment shall become the property of the client, subject to the terms of the consultancy contract.</p><ol><li>&nbsp;Application Submission Requirements</li></ol><p>Interested and qualified applicants are invited to submit their applications by close of business on <strong>Friday, 25 September 2026</strong>. Applications may be submitted either electronically or in hard copy.</p><p><strong>Electronic Submissions</strong></p><p>Applications submitted electronically should be sent to the following email addresses:</p><p>mjannehhiswaca@gbosgov.org</p><p>smendyhiswaca@gbosgov.org</p><p>hydarakutubhiswaca@gbosgov.org</p><p>ejabanghiswaca@gbosgov.org</p><p><strong>Hard Copy Submissions</strong></p><p>Hard copy applications should be delivered to:</p><p>Mr. Mohammed L. Janneh</p><p>HISWACA Project</p><p>Mansa Musa Faal Complex</p><p>Bijilo, The Gambia</p><p>&nbsp;</p><p><strong>Application Labelling</strong></p><p>Applicants should clearly indicate the position title, <strong><em>&ldquo;Individual Consultant for the Mid-Term Review of the HISWACA Project in The Gambia,</em></strong>&rdquo; in the subject line of electronic submissions or on the envelope containing a hard copy application.</p>"},{"id":"OP00475048","notice_type":"Request for Expression of Interest","noticedate":"14-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-31T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P181237","project_name":"Strengthening Public Financial Management II Project","bid_reference_no":"FM-DOFA-574065-CS-INDV","bid_description":"Finance Consultant State of Chuuk 2","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"FSM National Government PO Box PS 158 Palikir Pohnpei 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"osbert.atusaasiire@dofa.gov.fm","contact_name":"Osbert Atusaasiire","contact_organization":"Department of Finance and Administration","contact_phone_no":"320-2640 or 320-2645","contact_web_url":"fsmsofa@mail.fm","submission_date":"2026-10-14T00:00:00Z","notice_text":"<p><strong>FEDERATED STATES OF MICRONESIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:217px\"><p>Country</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:406px\"><p>Federated States of Micronesia</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Project for Strengthening Public Financial Management II (P181237)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project Implementing Agency / Client</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Department of Finance and Administration (DOFA)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Assignment Title</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Finance Consultant for Chuuk State</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Open International</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Contract Type</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Time Based&nbsp;</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Reference No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>FM-DOFA-574065-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Credit/Grant No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>IDA-E4120</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Date of Advertisement</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>October 16, 2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Deadline for Submission</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>October 31, 2026</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>The Government of The Federated States of Micronesia (FSM) has received financing from the World Bank toward the cost of <strong>the Strengthening Public Financial Management II (PFM II) Project (P181237)</strong> and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) involve providing full-time technical advisory and capacity-building support under <strong>Component 2 &ndash; Expand Core Financial Management Information System (FMIS), Subcomponent 2.1 &ndash; Continued Rollout of Core Public Finance System </strong>of the PFM II Project.</p><p>&nbsp;</p><p>The <strong>Finance Consultant for Chuuk State</strong> will support the Chuuk State Finance Department in the continued rollout, operationalization, and stabilization of the FreeBalance FMIS. The assignment will focus on validating financial transactions and data migrated from FundWare to FreeBalance, reconciling FY26 opening balances, strengthening accounting and financial reporting processes, improving internal controls related to FMIS operations, and building the capacity of State Finance staff to use the system effectively and sustainably.</p><p>&nbsp;</p><p>The key responsibilities will include, but not be limited to:</p><ul><li>Reviewing and validating financial transactions, account balances, and data migrated from FundWare to FreeBalance, including the reconciliation and validation of FY26 opening balances.</li><li>Supporting FreeBalance stabilization by identifying, documenting, prioritizing, escalating, and following up on accounting, data migration, transaction-processing, reporting, and system-related issues.</li><li>Supporting monthly financial reporting, bank reconciliations, accounting entries, and month-end and year-end accounting processes in accordance with applicable GASB, GAAP, and FSM accounting requirements.</li><li>Reviewing and strengthening internal controls, accounting procedures, and compliance-monitoring practices relevant to FMIS operations.</li><li>Providing hands-on coaching and on-the-job training to Chuuk State Finance staff in government accounting, FreeBalance operations, reconciliations, financial reporting, data validation, and issue resolution.</li><li>Coordinating with the FSM Department of Finance and Administration at the National Government level, the PFM II Project Management Unit, the FMIS Adviser, ICT personnel, and FreeBalance specialists to resolve accounting and system issues and support sustainable FMIS operations.</li></ul><p>&nbsp;</p><p>The assignment will be based in <strong>Weno, Chuuk State, Federated States of Micronesia</strong>, with coordination with the FSM Department of Finance and Administration at the National Government level. The consultancy is expected to be full-time for twelve (12) months, with an anticipated start date as soon as possible, subject to completion of the selection and contracting process.</p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment can be found at the Department of Finance and Administration website:<strong> </strong><strong>https://dofa.gov.fm</strong>, as part of this REOI, or can be obtained at the address given below.</p><p>&nbsp;</p><p>The Department of Finance and Administration now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Consultants should submit a <strong>Curriculum Vitae (CV) </strong>describing their qualifications, professional experience, experience in similar assignments and relevant experience in similar institutional or country contexts together with a <strong>cover letter </strong>outlining their interest in the assignment and suitability for the position.</p><p>&nbsp;</p><p>The criteria for selecting the Consultant are:</p><p><strong>Mandatory&nbsp;Requirements:</strong></p><p>The Consultant shall possess:</p><ol><li><strong>Education:</strong> A Master&#39;s degree in Accounting. Candidates holding a CPA qualification together with a degree in Finance, Information Systems, Public Administration, or an equivalent related field are also encouraged to apply.</li><li><strong>Professional Experience:</strong> At least ten (10) years of progressive experience in public sector accounting, financial management, and Public Financial Management (PFM) reforms.</li><li><strong>Technical Expertise:</strong> Demonstrated expertise in applying Governmental Accounting Standards Board (GASB) pronouncements and Generally Accepted Accounting Principles (GAAP), extensive experience with FMIS implementation, operationalization, stabilization, transaction processing, financial reporting, reconciliation and/or data migration, and demonstrated ability to identify, analyze, and resolve accounting, financial data, and system-related issues in an FMIS environment.</li></ol><p><strong>Desirable:</strong></p><ol><li><strong>Software Proficiency:</strong> Experience with FundWare and/or FreeBalance, particularly in FMIS stabilization, troubleshooting, issue escalation, and coordination with system vendors and national-level technical teams.</li><li><strong>Capacity Building and Communication:</strong> Proven ability to train and mentor government staff in financial reporting, PFM principles, and new software systems, supported by excellent analytical, communication, and report-writing skills.</li><li><strong>Governmental Accounting Knowledge:</strong> Thorough knowledge of governmental fund financial statements and government-wide financial reporting, including the Statement of Net Position, the three categories of Net Position, program and general revenues, Transfers and Internal Balances, the five categories of Fund Balance, and the distinction between Revenues and Other Financing Sources and Expenditures and Other Financing Uses.</li><li><strong>Geographic Experience:</strong> Prior experience working with island nations or small governments.</li></ol><p>The attention of interested Consultants is drawn to <strong>paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Seventh Edition, September 2025 </strong>(&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours 08:00 to 17:00 hours, Pohnpei Time.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail only&nbsp;<strong>preferably by 5pm Pohnpei Time, October 31, 2026. </strong>Expressions of Interest must be submitted&nbsp;<strong>by email only</strong>&nbsp;to the following addresses:</p><p>&nbsp;</p><p>Attn: Osbert Atusaasiire<br />Project Manager PFM II</p><p>Department of Finance and Administration</p><p>Palikir, Federated States of Micronesia</p><p>Email: <strong>osbert.atusaasiire@dofa.gov.fm</strong></p><p>And cc to:<strong> arrio.abello@dofa.gov.fm</strong></p><p>&nbsp;</p><p><strong>Terms of Reference &ndash; Finance Consultant</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p><strong>Title:</strong></p></td><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p><strong>Finance Consultant</strong></p></td></tr><tr><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Location:</p></td><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>Finance Department of the Chuuk State Government with Coordination with the FSM Department of Finance &amp; Administration at the National Government level</p></td></tr><tr><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Duration:</p></td><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>12 months&nbsp;</p></td></tr><tr><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Tentative Start Date:</p></td><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>As soon as possible</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>1. Background</strong></p><p>The project, Federated States of Micronesia (FSM) Strengthening Public Financial Management II (PFM II), builds upon key public financial management (PFM) reforms achieved under the previous FSM Project for Strengthening Public Financial Management (P161669) (PFM I).&nbsp; The objective of PFM II is to improve fiscal management practices and increase fiscal transparency at the National Government level.&nbsp; PFM II supports key strategic areas defined in FSM&rsquo;s 2023-2026 PFM Reform Roadmap, e.g. addressing challenges in core institutional public finance capacity.&nbsp; Specifically, the project supports:</p><ol><li>Improved fiscal management practices and controls (Component 1)</li><li>Expanded core financial management information systems (Component 2)</li><li>Enhanced human resource capacity, communications and change management (Component 3)</li><li>Project management (Component 4)</li></ol><p>&nbsp;</p><p>The Federated States of Micronesia (FSM) Department of Finance &amp; Administration is committed to enhancing its financial reporting and overall public financial management (PFM) capabilities.</p><p>&nbsp;</p><p>The Government&#39;s financial statements must adhere to a complex set of reporting requirements, including those of the Governmental Accounting Standards Board (GASB) and Generally Accepted Accounting Principles (GAAP). Additionally, the FSM Government operates with various funds and component units, which necessitate specialized accounting and reporting treatments. Beyond financial reporting, the Government seeks to strengthen its budget preparation process, internal controls, and overall compliance framework to ensure greater efficiency, transparency, and accountability.</p><p>&nbsp;</p><p>To address these challenges and improve the quality of financial management, the FSM Department of Finance &amp; Administration (DOFA) seeks to engage a highly qualified &nbsp;Financial Consultant with expertise in public sector accounting, GASB, GAAP, fund accounting, financial reporting, FMIS operationalization and stabilization and broader PFM principles.</p><p>&nbsp;</p><p>The Finance Consultant will be assigned to the Chuuk State Finance Department and will work closely with State Finance staff, the FSM Department of Finance and Administration (DOFA) at the National Government level, the PFM II Project Management Unit, the FMIS Advisor, FreeBalance specialists and relevant ICT personnel. The Consultant will support the ongoing stabilization and effective operationalization of FreeBalance, including addressing accounting and data issues arising from the migration from FundWare to FreeBalance.</p><p>&nbsp;</p><p><strong>2. Objective</strong></p><p>The primary objective of the consultancy is to strengthen financial management, accounting, reporting and FMIS operations at the State level, with particular emphasis on supporting the ongoing FreeBalance Stabilization Strategy and ensuring the accuracy and completeness of financial information in FreeBalance. The Consultant will:</p><ol><li>Verify revenue and expenditures including payroll and other financial transactions for accuracy, completeness, appropriate classification and compliance with applicable accounting requirements.</li><li>Conduct transaction reviews and reconciliations to validate data originating from FundWare and other legacy records against data captured in FreeBalance and identify and address outstanding accounting and migration issues.</li><li>Establish and implement robust procedures for validating, classifying, coding and recording revenues and expenditures in FreeBalance.</li><li>Provide hands-on support to relevant Finance staff in processing, reviewing and validating transactions in FreeBalance and strengthening their ability to use the system effectively.</li><li>&nbsp;Support the identification, reconciliation and resolution of outstanding accounting and data migration issues from FundWare to FreeBalance, and validate that migrated financial information is accurate, complete and appropriately classified.</li><li>Ensure that GASB, GAAP and applicable FSM accounting and financial reporting requirements are appropriately reflected in transactions, reconciliations, migrated data and financial reports.</li><li>Validate that opening balances for FY26 accounts in FreeBalance are accurate, complete, properly supported and reconciled to the relevant prior-period financial records.</li><li>Coordinate technical and system-related issues with the FSM Department of Finance and Administration at the National Government level, including the FMIS Advisor, ICT Advisor, FreeBalance specialists and other designated technical resources.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>3. Scope of Work</strong></p><p>The consultant will be responsible for, but not limited to, the following tasks:</p><p><strong>A. FMIS Operationalisation, Stabilization and Data Validation:</strong></p><ul><li><strong>Data Migration and Accounting Issues: </strong>Support the review and resolution of outstanding accounting and data migration issues arising from the transition from FundWare to FreeBalance. The Consultant will work with State Finance staff and relevant technical specialists to identify discrepancies, determine appropriate accounting treatment and follow up on corrective actions.</li><li><strong>FreeBalance Stabilization:</strong> Actively support the implementation of the FreeBalance Stabilization Strategy by identifying, documenting, prioritising and following up on operational, accounting, transaction, reporting and data issues affecting the State Finance Department.</li><li><strong>Data and Transaction Validation:</strong> Work with State Finance staff and relevant technical specialists to validate migrated data and transactions, identify discrepancies and ensure that corrective actions are properly implemented.</li><li><strong>FY26 Opening Balances:</strong> Review and reconcile FY26 opening balances in FreeBalance to the relevant prior-period records and supporting documentation, and ensure that opening balances are accurate, complete and appropriately classified.</li><li><strong>Ongoing Operational Support: </strong>Provide on-site and remote support to address continuing FreeBalance operational, accounting, data and reporting issues as part of the stabilization process.</li><li><strong>Software Training:</strong> Collaborate with the software vendor and internal staff to ensure the training program for the new FreeBalance system effectively addresses the needs of all users.</li><li><strong>Technical Coordination and Escalation:</strong> Coordinate technical issues with the FSM Department of Finance &amp; Administration at National Government level, including the FMIS Adviser, ICT personnel and FreeBalance specialists. Where appropriate, document and escalate issues through the FreeBalance support channels and follow up until resolution or an agreed corrective action is established</li></ul><p>&nbsp;</p><p><strong>B. Internal Control and Compliance:</strong></p><ul><li><strong>Internal Control Framework:</strong> review and strengthen the existing accounting policies, procedures and manual to enhance the internal control framework, focusing on key financial processes such as revenue collection, asset management, payroll, etc.</li><li><strong>Compliance:</strong> assist in the development of a compliance checklist or a compliance-monitoring system to ensure adherence to financial/accounting regulations, laws, and policies.</li><li><strong>Risk Assessment:</strong> Conduct a risk assessment of key financial processes and recommend mitigation strategies.</li><li><strong>Control Implementation and Follow-up:</strong> Provide practical support to Finance staff in implementing and monitoring accounting controls, particularly controls relating to transaction processing, reconciliations, financial reporting, data quality and FreeBalance operations.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>C. Accounting and Financial Reporting Support:</strong></p><ul><li>Train accountants in government institutions on how to post accounting entries in the FreeBalance system and provide on the job support.</li><li>Support government accountants to produce monthly reports on the FreeBalance system</li><li>Provide on the job support to do bank reconciliations and enter government assets into the FreeBalance system.</li><li>Support the preparation and review of monthly and periodic financial reports, including review of supporting schedules and follow-up of unusual balances, unreconciled items and reporting discrepancies.</li><li>Support bank and other account reconciliations and follow up on outstanding reconciling items.</li><li>Review transactions and account balances to identify accounting errors, incomplete postings, incorrect classifications or other issues affecting the reliability of financial information.</li><li>Support month-end and year-end accounting processes and ensure that relevant balances and supporting records are appropriately reconciled and maintained.</li><li>Provide specific support to validate FY26 opening balances and ensure that they are complete, accurate, reconciled and supported by appropriate documentation.</li></ul><p>&nbsp;</p><p><strong>D. FreeBalance Stabilization and Issue Management</strong></p><ul><li><ul><li>Maintain a structured record of FreeBalance issues identified by the State Finance Department, including the nature of the issue, affected transactions/accounts, actions taken, responsible parties and status.</li><li>Work with the FMIS Adviser, FreeBalance specialists, ICT personnel and National DoFA to investigate and resolve issues affecting transaction processing, accounting, reporting, data migration and system functionality.</li><li>Escalate unresolved technical issues through the appropriate FreeBalance support channels and coordinate follow-up with National DoFA and relevant technical specialists.</li><li>Validate implemented corrections and confirm that resolved issues have been appropriately addressed from an accounting and financial reporting perspective.</li></ul></li></ul><p>&nbsp;</p><p><strong>E. Knowledge Transfer:</strong></p><ul><li>Conduct workshops and one-on-one training sessions for the Department of Finance &amp; Administration staff on financial reporting, PFM principles, and internal controls.</li><li>Assist in the development or revision of financial reporting, budgeting, and internal control policies and procedures to align with best practices and international standards.</li><li>Provide hands-on coaching and on-the-job training to State Finance staff in FreeBalance transaction processing, reconciliations, financial reporting, data validation and issue identification.</li><li>Build the capacity of State Finance staff to independently identify, document, escalate and follow up on FreeBalance and accounting issues.</li><li>Coordinate capacity-building activities with the FMIS Adviser, FreeBalance specialists and National DoFA to avoid duplication and ensure consistency of technical guidance.</li></ul><p>&nbsp;</p><p><strong>4. Deliverables</strong></p><p>The consultant will be expected to produce the following deliverables:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:6%\"><p><strong>No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:69%\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:24%\"><p><strong>Frequency / Timing</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Initial Assessment and Work Plan</strong> &ndash; assessment of accounting, financial reporting, reconciliation, FreeBalance operationalisation, outstanding FundWare-to-FreeBalance issues, FY26 opening balances, internal controls and key capacity needs, with an agreed work plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Once &ndash; within first month</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Monthly Finance, FMIS and Stabilization Report</strong> &ndash; progress on financial reporting and reconciliations; FreeBalance issues identified and escalated; FundWare-to-FreeBalance accounting/migration issues; FY26 opening balance validation; corrective actions and outstanding matters; and capacity-building activities.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Financial Reporting, Reconciliation and Accounting Support</strong> &ndash; monthly financial reports, reconciliations, transaction validation, review of accounting records and supporting schedules, and follow-up of outstanding accounting issues.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Monthly / ongoing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Capacity Building and OJT</strong> &ndash; practical coaching and on-the-job support to State Finance staff in FreeBalance, accounting, reconciliations, financial reporting, internal controls and issue resolution.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Ongoing; summarized monthly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Final Assignment Report</strong> &ndash; summary of work completed, key findings, outstanding FreeBalance/accounting issues, actions taken, capacity built and recommendations for continued stabilization and sustainability.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Once &ndash; end of assignment</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>5. Qualifications and Experience</strong></p><p>The ideal candidate will have a strong background in public sector finance, including extensive experience with government accounting standards, financial systems, and capacity building.</p><p><strong>Mandatory Qualifications</strong></p><ul><li><strong>Education:</strong> A Master&#39;s degree in Accounting. A Certified Public Accountant (CPA) designation is highly preferred. If you do have a CPA qualification and a different degree that relates to Finance, Information Systems, Public Administration or equivalent in a related field, you are encouraged to apply.</li><li><strong>Professional Experience:</strong> A minimum of 10 years of progressive experience in public sector accounting, financial management, and Public Financial Management (PFM) reforms.</li></ul><ul><li><strong>Technical Expertise:</strong> Demonstrated expertise in the application of Governmental Accounting Standards Board (GASB) pronouncements and Generally Accepted Accounting Principles (GAAP).</li><li>Extensive experience with Financial Management Information System (FMIS), including FMIS implementation, operationalization, stabilization, transaction processing, financial reporting, reconciliation and/or data migration, preferably with public sector clients.</li><li>Demonstrated experience in identifying, analyzing and resolving accounting, financial data and system-related issues in an FMIS environment.</li></ul><p>&nbsp;</p><p><strong>Desired Qualifications</strong></p><ul><li><strong>Software Proficiency:</strong> Experience with Fundware and/or FreeBalance software.</li><li><strong>Capacity Building:</strong> Proven ability to work with and train government staff on financial reporting, PFM principles, and new software systems.</li><li><strong>Analytical Skills:</strong> Excellent analytical, communication, and report-writing skills.</li><li><strong>Geographic Experience:</strong> Prior experience working with island nations or small governments.</li></ul><ul><li><strong>Governmental Accounting Knowledge: </strong>Thorough knowledge of concepts and principles related to governmental fund financial statements.</li><li>Experience in constructing the Statement of Net Position in government-wide financial statements.</li><li>A working understanding of the three categories of Net Position, and how to distinguish between program and general revenue.</li><li>Familiarity with the differences between Transfers and Internal Balances accounts.</li><li>A strong grasp of the five categories of Fund Balance.</li><li>Knowledge of the differences (for governmental funds) between Revenues and Other Financing Sources and Expenditures and Other Financing Uses.</li><li>Experience supporting FMIS stabilization, troubleshooting, issue escalation and coordination with system vendors and national-level technical teams.</li></ul><p>&nbsp;</p><p><strong>6. Duration and Reporting</strong></p><ul><li><strong>Duration:</strong> The consultancy is expected to be for a period of 1 year.</li><li><strong>Reporting:</strong> The Consultant will report directly to the Secretary of the FSM Department of Finance &amp; Administration or a designated representative. The Financial Consultant will work closely with the Finance Department of the Chuuk State Government and coordinate with the PFM II Project Management Unit on matters related to the assignment.</li><li>Regular progress reports will be required on monthly basis.</li><li>Monthly progress reports will include at a minimum, activities completed, financial reporting and reconciliation support, FreeBalance issues identified and escalated, FundWare-to-FreeBalance accounting/migration issues, FY26 opening balance validation, corrective actions, capacity-building activities and outstanding issues requiring follow-up.</li></ul>"},{"id":"OP00475054","notice_type":"Request for Expression of Interest","noticedate":"14-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-31T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P181237","project_name":"Strengthening Public Financial Management II Project","bid_reference_no":"FM-DOFA-574066-CS-INDV","bid_description":"Finance Consultant State of Yap 2","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"FSM National Government PO Box PS 158 Palikir Pohnpei 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"osbert.atusaasiire@dofa.gov.fm","contact_name":"Osbert Atusaasiire","contact_organization":"Department of Finance and Administration","contact_phone_no":"320-2640 or 320-2645","contact_web_url":"fsmsofa@mail.fm","submission_date":"2026-10-14T00:00:00Z","notice_text":"<p><strong>FEDERATED STATES OF MICRONESIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:217px\"><p>Country</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:406px\"><p>Federated States of Micronesia</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Project for Strengthening Public Financial Management II (P181237)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project Implementing Agency / Client</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Department of Finance and Administration (DOFA)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Assignment Title</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Finance Consultant for Yap State</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Open International</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Contract Type</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Time Based&nbsp;</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Reference No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>FM-DOFA-574066-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Credit/Grant No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>IDA-E4120</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Date of Advertisement</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>October 16, 2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Deadline for Submission</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>October 31, 2026</p></td></tr></tbody></table><p>&nbsp;</p><p>The Government of The Federated States of Micronesia (FSM) has received financing from the World Bank toward the cost of <strong>the Strengthening Public Financial Management II (PFM II) Project (P181237)</strong> and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) involve providing full-time technical advisory and capacity-building support under <strong>Component 2 &ndash; Expand Core Financial Management Information System (FMIS), Subcomponent 2.1 &ndash; Continued Rollout of Core Public Finance System </strong>of the PFM II Project.</p><p>&nbsp;</p><p>The <strong>Finance Consultant for Yap State</strong> will support the Yap State Finance Department in the continued rollout, operationalization, and stabilization of the FreeBalance FMIS. The assignment will focus on validating financial transactions and data migrated from FundWare to FreeBalance, reconciling FY26 opening balances, strengthening accounting and financial reporting processes, improving internal controls related to FMIS operations, and building the capacity of State Finance staff to use the system effectively and sustainably.</p><p>&nbsp;</p><p>The key responsibilities will include, but not be limited to:</p><ul><li>Reviewing and validating financial transactions, account balances, and data migrated from FundWare to FreeBalance, including the reconciliation and validation of FY26 opening balances.</li><li>Supporting FreeBalance stabilization by identifying, documenting, prioritizing, escalating, and following up on accounting, data migration, transaction-processing, reporting, and system-related issues.</li><li>Supporting monthly financial reporting, bank reconciliations, accounting entries, and month-end and year-end accounting processes in accordance with applicable GASB, GAAP, and FSM accounting requirements.</li><li>Reviewing and strengthening internal controls, accounting procedures, and compliance-monitoring practices relevant to FMIS operations.</li><li>Providing hands-on coaching and on-the-job training to Yap State Finance staff in government accounting, FreeBalance operations, reconciliations, financial reporting, data validation, and issue resolution.</li><li>Coordinating with the FSM Department of Finance and Administration at the National Government level, the PFM II Project Management Unit, the FMIS Adviser, ICT personnel, and FreeBalance specialists to resolve accounting and system issues and support sustainable FMIS operations.</li></ul><p>&nbsp;</p><p>The assignment will be based in <strong>Colonia, Yap State, Federated States of Micronesia</strong>, with coordination with the FSM Department of Finance and Administration at the National Government level. The consultancy is expected to be full-time for twelve (12) months, with an anticipated start date as soon as possible, subject to completion of the selection and contracting process.</p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment can be found at the Department of Finance and Administration website:<strong> </strong><strong>https://dofa.gov.fm</strong>, as part of this REOI, or can be obtained at the address given below.</p><p>&nbsp;</p><p>The Department of Finance and Administration now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Consultants should submit a <strong>Curriculum Vitae (CV) </strong>describing their qualifications, professional experience, experience in similar assignments and relevant experience in similar institutional or country contexts together with a <strong>cover letter </strong>outlining their interest in the assignment and suitability for the position.</p><p>&nbsp;</p><p>The criteria for selecting the Consultant are:</p><p><strong>Mandatory&nbsp;Requirements:</strong></p><p>The Consultant shall possess:</p><ol><li><strong>Education:</strong> A Master&#39;s degree in Accounting. Candidates holding a CPA qualification together with a degree in Finance, Information Systems, Public Administration, or an equivalent related field are also encouraged to apply.</li><li><strong>Professional Experience:</strong> At least ten (10) years of progressive experience in public sector accounting, financial management, and Public Financial Management (PFM) reforms.</li><li><strong>Technical Expertise:</strong> Demonstrated expertise in applying Governmental Accounting Standards Board (GASB) pronouncements and Generally Accepted Accounting Principles (GAAP), extensive experience with FMIS implementation, operationalization, stabilization, transaction processing, financial reporting, reconciliation and/or data migration, and demonstrated ability to identify, analyze, and resolve accounting, financial data, and system-related issues in an FMIS environment.</li></ol><p><strong>Desirable:</strong></p><ol><li><strong>Software Proficiency:</strong> Experience with FundWare and/or FreeBalance, particularly in FMIS stabilization, troubleshooting, issue escalation, and coordination with system vendors and national-level technical teams.</li><li><strong>Capacity Building and Communication:</strong> Proven ability to train and mentor government staff in financial reporting, PFM principles, and new software systems, supported by excellent analytical, communication, and report-writing skills.</li><li><strong>Governmental Accounting Knowledge:</strong> Thorough knowledge of governmental fund financial statements and government-wide financial reporting, including the Statement of Net Position, the three categories of Net Position, program and general revenues, Transfers and Internal Balances, the five categories of Fund Balance, and the distinction between Revenues and Other Financing Sources and Expenditures and Other Financing Uses.</li><li><strong>Geographic Experience:</strong> Prior experience working with island nations or small governments.</li></ol><p>The attention of interested Consultants is drawn to <strong>paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Seventh Edition, September 2025 </strong>(&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours 08:00 to 17:00 hours, Pohnpei Time.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail only&nbsp;<strong>preferably by 5pm Pohnpei Time, October 31, 2026. </strong>Expressions of Interest must be submitted&nbsp;<strong>by email only</strong>&nbsp;to the following addresses:</p><p>&nbsp;</p><p>Attn: Osbert Atusaasiire<br />Project Manager PFM II</p><p>Department of Finance and Administration</p><p>Palikir, Federated States of Micronesia</p><p>Email: <strong>osbert.atusaasiire@dofa.gov.fm</strong></p><p>And cc to:<strong> arrio.abello@dofa.gov.fm</strong></p><p>&nbsp;</p><p><strong>Terms of Reference &ndash; Finance Consultant</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p><strong>Title:</strong></p></td><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p><strong>Finance Consultant</strong></p></td></tr><tr><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Location:</p></td><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>Finance Department of the Yap State Government with Coordination with the FSM Department of Finance &amp; Administration at the National Government level</p></td></tr><tr><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Duration:</p></td><td style=\"background-color:white; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>12 months&nbsp;</p></td></tr><tr><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:17%\"><p>Tentative Start Date:</p></td><td style=\"background-color:#f5f7fc; border-bottom:none; border-left:none; border-right:none; border-top:none; width:82%\"><p>As soon as possible</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>1. Background</strong></p><p>The project, Federated States of Micronesia (FSM) Strengthening Public Financial Management II (PFM II), builds upon key public financial management (PFM) reforms achieved under the previous FSM Project for Strengthening Public Financial Management (P161669) (PFM I).&nbsp; The objective of PFM II is to improve fiscal management practices and increase fiscal transparency at the National Government level.&nbsp; PFM II supports key strategic areas defined in FSM&rsquo;s 2023-2026 PFM Reform Roadmap, e.g. addressing challenges in core institutional public finance capacity.&nbsp; Specifically, the project supports:</p><ol><li>Improved fiscal management practices and controls (Component 1)</li><li>Expanded core financial management information systems (Component 2)</li><li>Enhanced human resource capacity, communications and change management (Component 3)</li><li>Project management (Component 4)</li></ol><p>&nbsp;</p><p>The Federated States of Micronesia (FSM) Department of Finance &amp; Administration is committed to enhancing its financial reporting and overall public financial management (PFM) capabilities.</p><p>&nbsp;</p><p>The Government&#39;s financial statements must adhere to a complex set of reporting requirements, including those of the Governmental Accounting Standards Board (GASB) and Generally Accepted Accounting Principles (GAAP). Additionally, the FSM Government operates with various funds and component units, which necessitate specialized accounting and reporting treatments. Beyond financial reporting, the Government seeks to strengthen its budget preparation process, internal controls, and overall compliance framework to ensure greater efficiency, transparency, and accountability.</p><p>&nbsp;</p><p>To address these challenges and improve the quality of financial management, the FSM Department of Finance &amp; Administration (DOFA) seeks to engage a highly qualified &nbsp;Financial Consultant with expertise in public sector accounting, GASB, GAAP, fund accounting, financial reporting, FMIS operationalization and stabilization and broader PFM principles.</p><p>&nbsp;</p><p>The Finance Consultant will be assigned to the Yap State Finance Department and will work closely with State Finance staff, the FSM Department of Finance and Administration (DOFA) at the National Government level, the PFM II Project Management Unit, the FMIS Advisor, FreeBalance specialists and relevant ICT personnel. The Consultant will support the ongoing stabilization and effective operationalization of FreeBalance, including addressing accounting and data issues arising from the migration from FundWare to FreeBalance.</p><p>&nbsp;</p><p><strong>2. Objective</strong></p><p>The primary objective of the consultancy is to strengthen financial management, accounting, reporting and FMIS operations at the State level, with particular emphasis on supporting the ongoing FreeBalance Stabilization Strategy and ensuring the accuracy and completeness of financial information in FreeBalance. The Consultant will:</p><ol><li>Verify revenue and expenditures including payroll and other financial transactions for accuracy, completeness, appropriate classification and compliance with applicable accounting requirements.</li><li>Conduct transaction reviews and reconciliations to validate data originating from FundWare and other legacy records against data captured in FreeBalance and identify and address outstanding accounting and migration issues.</li><li>Establish and implement robust procedures for validating, classifying, coding and recording revenues and expenditures in FreeBalance.</li><li>Provide hands-on support to relevant Finance staff in processing, reviewing and validating transactions in FreeBalance and strengthening their ability to use the system effectively.</li><li>&nbsp;Support the identification, reconciliation and resolution of outstanding accounting and data migration issues from FundWare to FreeBalance, and validate that migrated financial information is accurate, complete and appropriately classified.</li><li>Ensure that GASB, GAAP and applicable FSM accounting and financial reporting requirements are appropriately reflected in transactions, reconciliations, migrated data and financial reports.</li><li>Validate that opening balances for FY26 accounts in FreeBalance are accurate, complete, properly supported and reconciled to the relevant prior-period financial records.</li><li>Coordinate technical and system-related issues with the FSM Department of Finance and Administration at the National Government level, including the FMIS Advisor, ICT Advisor, FreeBalance specialists and other designated technical resources.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>3. Scope of Work</strong></p><p>The consultant will be responsible for, but not limited to, the following tasks:</p><p><strong>A. FMIS Operationalisation, Stabilization and Data Validation:</strong></p><ul><li><strong>Data Migration and Accounting Issues: </strong>Support the review and resolution of outstanding accounting and data migration issues arising from the transition from FundWare to FreeBalance. The Consultant will work with State Finance staff and relevant technical specialists to identify discrepancies, determine appropriate accounting treatment and follow up on corrective actions.</li><li><strong>FreeBalance Stabilization:</strong> Actively support the implementation of the FreeBalance Stabilization Strategy by identifying, documenting, prioritising and following up on operational, accounting, transaction, reporting and data issues affecting the State Finance Department.</li><li><strong>Data and Transaction Validation:</strong> Work with State Finance staff and relevant technical specialists to validate migrated data and transactions, identify discrepancies and ensure that corrective actions are properly implemented.</li><li><strong>FY26 Opening Balances:</strong> Review and reconcile FY26 opening balances in FreeBalance to the relevant prior-period records and supporting documentation, and ensure that opening balances are accurate, complete and appropriately classified.</li><li><strong>Ongoing Operational Support: </strong>Provide on-site and remote support to address continuing FreeBalance operational, accounting, data and reporting issues as part of the stabilization process.</li><li><strong>Software Training:</strong> Collaborate with the software vendor and internal staff to ensure the training program for the new FreeBalance system effectively addresses the needs of all users.</li><li><strong>Technical Coordination and Escalation:</strong> Coordinate technical issues with the FSM Department of Finance &amp; Administration at National Government level, including the FMIS Adviser, ICT personnel and FreeBalance specialists. Where appropriate, document and escalate issues through the FreeBalance support channels and follow up until resolution or an agreed corrective action is established</li></ul><p>&nbsp;</p><p><strong>B. Internal Control and Compliance:</strong></p><ul><li><strong>Internal Control Framework:</strong> review and strengthen the existing accounting policies, procedures and manual to enhance the internal control framework, focusing on key financial processes such as revenue collection, asset management, payroll, etc.</li><li><strong>Compliance:</strong> assist in the development of a compliance checklist or a compliance-monitoring system to ensure adherence to financial/accounting regulations, laws, and policies.</li><li><strong>Risk Assessment:</strong> Conduct a risk assessment of key financial processes and recommend mitigation strategies.</li><li><strong>Control Implementation and Follow-up:</strong> Provide practical support to Finance staff in implementing and monitoring accounting controls, particularly controls relating to transaction processing, reconciliations, financial reporting, data quality and FreeBalance operations.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>C. Accounting and Financial Reporting Support:</strong></p><ul><li>Train accountants in government institutions on how to post accounting entries in the FreeBalance system and provide on the job support.</li><li>Support government accountants to produce monthly reports on the FreeBalance system</li><li>Provide on the job support to do bank reconciliations and enter government assets into the FreeBalance system.</li><li>Support the preparation and review of monthly and periodic financial reports, including review of supporting schedules and follow-up of unusual balances, unreconciled items and reporting discrepancies.</li><li>Support bank and other account reconciliations and follow up on outstanding reconciling items.</li><li>Review transactions and account balances to identify accounting errors, incomplete postings, incorrect classifications or other issues affecting the reliability of financial information.</li><li>Support month-end and year-end accounting processes and ensure that relevant balances and supporting records are appropriately reconciled and maintained.</li><li>Provide specific support to validate FY26 opening balances and ensure that they are complete, accurate, reconciled and supported by appropriate documentation.</li></ul><p>&nbsp;</p><p><strong>D. FreeBalance Stabilization and Issue Management</strong></p><ul><li><ul><li>Maintain a structured record of FreeBalance issues identified by the State Finance Department, including the nature of the issue, affected transactions/accounts, actions taken, responsible parties and status.</li><li>Work with the FMIS Adviser, FreeBalance specialists, ICT personnel and National DoFA to investigate and resolve issues affecting transaction processing, accounting, reporting, data migration and system functionality.</li><li>Escalate unresolved technical issues through the appropriate FreeBalance support channels and coordinate follow-up with National DoFA and relevant technical specialists.</li><li>Validate implemented corrections and confirm that resolved issues have been appropriately addressed from an accounting and financial reporting perspective.</li></ul></li></ul><p>&nbsp;</p><p><strong>E. Knowledge Transfer:</strong></p><ul><li>Conduct workshops and one-on-one training sessions for the Department of Finance &amp; Administration staff on financial reporting, PFM principles, and internal controls.</li><li>Assist in the development or revision of financial reporting, budgeting, and internal control policies and procedures to align with best practices and international standards.</li><li>Provide hands-on coaching and on-the-job training to State Finance staff in FreeBalance transaction processing, reconciliations, financial reporting, data validation and issue identification.</li><li>Build the capacity of State Finance staff to independently identify, document, escalate and follow up on FreeBalance and accounting issues.</li><li>Coordinate capacity-building activities with the FMIS Adviser, FreeBalance specialists and National DoFA to avoid duplication and ensure consistency of technical guidance.</li></ul><p>&nbsp;</p><p><strong>4. Deliverables</strong></p><p>The consultant will be expected to produce the following deliverables:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:6%\"><p><strong>No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:69%\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:24%\"><p><strong>Frequency / Timing</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Initial Assessment and Work Plan</strong> &ndash; assessment of accounting, financial reporting, reconciliation, FreeBalance operationalisation, outstanding FundWare-to-FreeBalance issues, FY26 opening balances, internal controls and key capacity needs, with an agreed work plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Once &ndash; within first month</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Monthly Finance, FMIS and Stabilization Report</strong> &ndash; progress on financial reporting and reconciliations; FreeBalance issues identified and escalated; FundWare-to-FreeBalance accounting/migration issues; FY26 opening balance validation; corrective actions and outstanding matters; and capacity-building activities.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Financial Reporting, Reconciliation and Accounting Support</strong> &ndash; monthly financial reports, reconciliations, transaction validation, review of accounting records and supporting schedules, and follow-up of outstanding accounting issues.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Monthly / ongoing</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Capacity Building and OJT</strong> &ndash; practical coaching and on-the-job support to State Finance staff in FreeBalance, accounting, reconciliations, financial reporting, internal controls and issue resolution.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Ongoing; summarized monthly</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:6%\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:69%\"><p><strong>Final Assignment Report</strong> &ndash; summary of work completed, key findings, outstanding FreeBalance/accounting issues, actions taken, capacity built and recommendations for continued stabilization and sustainability.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:24%\"><p>Once &ndash; end of assignment</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>5. Qualifications and Experience</strong></p><p>The ideal candidate will have a strong background in public sector finance, including extensive experience with government accounting standards, financial systems, and capacity building.</p><p><strong>Mandatory Qualifications</strong></p><ul><li><strong>Education:</strong> A Master&#39;s degree in Accounting. A Certified Public Accountant (CPA) designation is highly preferred. If you do have a CPA qualification and a different degree that relates to Finance, Information Systems, Public Administration or equivalent in a related field, you are encouraged to apply.</li><li><strong>Professional Experience:</strong> A minimum of 10 years of progressive experience in public sector accounting, financial management, and Public Financial Management (PFM) reforms.</li></ul><ul><li><strong>Technical Expertise:</strong> Demonstrated expertise in the application of Governmental Accounting Standards Board (GASB) pronouncements and Generally Accepted Accounting Principles (GAAP).</li><li>Extensive experience with Financial Management Information System (FMIS), including FMIS implementation, operationalization, stabilization, transaction processing, financial reporting, reconciliation and/or data migration, preferably with public sector clients.</li><li>Demonstrated experience in identifying, analyzing and resolving accounting, financial data and system-related issues in an FMIS environment.</li></ul><p>&nbsp;</p><p><strong>Desired Qualifications</strong></p><ul><li><strong>Software Proficiency:</strong> Experience with Fundware and/or FreeBalance software.</li><li><strong>Capacity Building:</strong> Proven ability to work with and train government staff on financial reporting, PFM principles, and new software systems.</li><li><strong>Analytical Skills:</strong> Excellent analytical, communication, and report-writing skills.</li><li><strong>Geographic Experience:</strong> Prior experience working with island nations or small governments.</li></ul><ul><li><strong>Governmental Accounting Knowledge: </strong>Thorough knowledge of concepts and principles related to governmental fund financial statements.</li><li>Experience in constructing the Statement of Net Position in government-wide financial statements.</li><li>A working understanding of the three categories of Net Position, and how to distinguish between program and general revenue.</li><li>Familiarity with the differences between Transfers and Internal Balances accounts.</li><li>A strong grasp of the five categories of Fund Balance.</li><li>Knowledge of the differences (for governmental funds) between Revenues and Other Financing Sources and Expenditures and Other Financing Uses.</li><li>Experience supporting FMIS stabilization, troubleshooting, issue escalation and coordination with system vendors and national-level technical teams.</li></ul><p>&nbsp;</p><p><strong>6. Duration and Reporting</strong></p><ul><li><strong>Duration:</strong> The consultancy is expected to be for a period of 1 year.</li><li><strong>Reporting:</strong> The Consultant will report directly to the Secretary of the FSM Department of Finance &amp; Administration or a designated representative. The Financial Consultant will work closely with the Finance Department of the Yap State Government and coordinate with the PFM II Project Management Unit on matters related to the assignment.</li><li>Regular progress reports will be required on monthly basis.</li><li>Monthly progress reports will include at a minimum, activities completed, financial reporting and reconciliation support, FreeBalance issues identified and escalated, FundWare-to-FreeBalance accounting/migration issues, FY26 opening balance validation, corrective actions, capacity-building activities and outstanding issues requiring follow-up.</li></ul>"},{"id":"OP00470809","notice_type":"Request for Expression of Interest","noticedate":"11-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-14T00:00:00Z","submission_deadline_time":"12:00","project_ctry_name":"Indonesia","project_id":"P173446","project_name":"Global Environment Facility Indonesia Sustainable Cities Impact Project","bid_reference_no":"ID-TRANSPORT - BAPPENAS-556265-CS-INDV","bid_description":"Transportation Project Management and Monitoring Evaluation Specialist for Component 2 GEF Indonesia SCIP","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Jl. Taman Suropati No.2, Menteng, Kec. Menteng, Kota Jakarta Pusat, DKI Jakarta 10310","contact_ctry_name":"Indonesia","contact_email":"handhi.adiputra@bappenas.go.id","contact_name":"Handhi Adiputra","contact_organization":"Directorate of Transportation, Ministry of National Development Planning/Bappenas","contact_phone_no":"0","contact_web_url":"https://www.bappenas.go.id/en","submission_date":"2026-10-11T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>(INDIVIDUAL CONSULTANT)</p><p><br />&nbsp;</p><p><strong>The Government of Indonesia</strong></p><p>Global Environment Facility Indonesia Sustainable Cities Impact Project</p><p>Grant No.: TF0B8114</p><p>Assignment Title: <strong>Transportation Project Management and Monitoring Evaluation Specialist</strong></p><p>(National Consultant)</p><p>Reference No.: ID-TRANSPORT-BAPPENAS-556265-CS-INDV&nbsp;</p><p><br />&nbsp;</p><p>The Government of Indonesia, through the Ministry of National Development Planning/National Development&nbsp; Planning&nbsp; Agency&nbsp; (Bappenas),&nbsp; has&nbsp; received&nbsp; grant&nbsp; funding&nbsp; from&nbsp; the&nbsp; Global&nbsp; Environment Facility (GEF) Sustainable Cities Impact Project (SCIP) through the World Bank. Part of this funding is allocated for individual consultant services.</p><p>&nbsp;</p><p>The Individual consultant services are output-based and will be <strong>responsible for</strong>:</p><ol><li>Project governance and management framework. Develop management and administrative frameworks on the PIU side of the SUMP development, including setting up stakeholder relations &amp; consultations arrangements to confirm project scope, data requirements, and monitoring methodologies have been aligned with the needs;</li><li>Oversight and safeguard supervision. Manage project governance through inter-agency coordination and milestone monitoring while overseeing the contracted consulting firms to ensure data quality, deliverable integrity, and full compliance with the project ToRs and World Bank&rsquo;s ESF and fiduciary requirements. This includes overseeing the administrative coordination, logistics, and documentation of Focus Group Discussions (FGDs) and steering committee meetings involving line ministries, local governments, and the World Bank;</li><li>Technical advisory on urban mobility and sustainable transport planning. Provide substantive technical advisory across the SUMP development cycle, including:</li></ol><ul><li>integration&nbsp; of&nbsp; sustainability,&nbsp; climate&nbsp; resilience,&nbsp; and&nbsp; World&nbsp; Bank&nbsp; ESF&nbsp; standards&nbsp; into&nbsp; transport planning documents;</li><li>review of environment, social and governance (ESG) monitoring frameworks and gender equality and social inclusion (GEDSI) to guarantee equitable engagement, transparent governance, and accountable decision-making;</li><li>strategic inputs for the development of Integrated Transport Authority (ITA) frameworks to support effective long-term SUMP implementation;</li><li>technical guidance on core transport planning methodologies, including four-step model, level of service (LOS), O/D Matrix development, concepts related to Functional Urban Area (FUA) and Transit-oriented Development (TOD), design and analysis of data collection and survey, scenario building and selection, and prioritization of programs;</li><li>inputs on transport economics and financing, including economic and financial appraisal of priority programs, cost-benefit and cost-effectiveness analysis, creative finance schemes (e.g. land value capture, KPBU/PPP, blended financing), and affordability and fiscal sustainability consideration.</li></ul><p>to shape the strategic direction of the Balikpapan and Palembang SUMP, ensuring that all technical outputs align with sectoral best practices and the project&rsquo;s regulatory framework.</p><p>4.&nbsp; &nbsp;Documentation compliance and audit-readiness. Ensure that contract and project documentation is maintained complete, properly filed, and consistent with prevailing national regulations, so as to support timely contract clearance and facilitate examination by oversight bodies including the Badan Pemeriksa Keuangan (BPK).&nbsp;</p><p>&nbsp;</p><p>In addition, The Consultant may be required to <strong>execute following supporting activities </strong>including but not limited to:</p><ol><li>Knowledge transfer to the Directorate. Work alongside the team of Individual Consultants to strengthen the technical capabilities of the Directorate in managing complex urban mobility frameworks, transport economics and creative financing, traffic demand management, and the governance of integrated transportation systems.</li><li>Support &nbsp; to &nbsp; World &nbsp; Bank &nbsp; implementation &nbsp; support &nbsp; missions. &nbsp; Contribute &nbsp; substantive &nbsp; inputs &nbsp; and documentation to World Bank implementation support missions, including pre-mission briefings, technical materials, and inputs to aide-memoires and management letters, ensuring that Directorate&rsquo;s positions and the SUMP project&rsquo;s progress are represented accurately and consistently.</li></ol><p><br />&nbsp;</p><p>The individual consultant services are expected to perform the service for 9 months. The detailed Terms of Reference (TOR) for the assignment can be found on the following website : <u>https://link.bappenas.go.id/TransportationME_</u>.</p><p>&nbsp;</p><p>The Directorate of Connectivity and Logistic Infrastructure at the Ministry of National Development Planning/National Development Planning Agency now invites eligible individual consultant (&ldquo;Consultant&rdquo;) to indicate their interest in providing the Services. Interested Consultant should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are the relevant experience of the individual consultant in:</p><p>&nbsp;</p><p>REQUIRED SKILLS AND EXPERIENCE</p><p>Essential Qualification</p><ol><li>Minimum requirement of a master&rsquo;s degree in urban planning,&nbsp; transport engineering, transport economics, transport project management, public policy, business administration, or a related field;</li><li>More than 15 years of work experience in urban mobility, sustainable transport planning, and/or transport sector policy, of which at least 5 years in advisory, planning, or project management roles;</li><li>Has experience in a minimum of one (1) SUMP/Pre-FS/FS project (proven by CV and supporting document(s) such as contracts, acknowledgment letter, or other related documents);</li><li>Demonstrated&nbsp; experience&nbsp; in&nbsp; project&nbsp; management&nbsp; and/or&nbsp; monitoring&nbsp; and&nbsp; evaluation&nbsp; of&nbsp; donor- financed or government-financed transport, infrastructure, or planning projects, including managing project timelines, deliverables, and reporting cycles;</li><li>Familiarity with the Indonesian national and subnational development planning system (RPJMN, RKP, RPJMD, RTRW) and relevant transport sector regulatory framework, as well as the World Bank&rsquo;s Environmental and Social Framework (ESF) or equivalent safeguards systems (e.g. ADB SPS, IFC Performance Standards);</li><li>Proficient in performing quantitative and qualitative data analysis in transportation sector and demonstrating strong communication and writing skills in professional English (proven by policy papers/books/studies/journals/research/essay/report/ToR sample in English) and Bahasa Indonesia;</li><li>Experience working on national/international development agency operations such as Ministry of National Development Planning (Bappenas)/Ministry of Transportation/World Bank/Asian Development Bank/USAID/GIZ/GCF/KIAT, etc.</li></ol><p>Desirable Qualifications</p><ol><li>Experience with sustainable transport, climate resilience, NDC-aligned transport interventions, or low-carbon mobility programs;</li><li>Experience integrating gender equality, disability and social inclusion (GEDSI) and environment, social and governance (ESG) considerations into transport or infrastructure planning;</li><li>Familiarity with the design or operationalization of metropolitan or city-level transport authorities&nbsp; in Indonesia or comparable contexts;</li><li>Familiarity with economic and financial appraisal of transport projects (cost-benefit and cost- effectiveness analysis) and/or transport financing mechanisms (KPBU/PPP, blended finance, land value capture, fiscal transfer schemes for Pemda);</li><li>Project management certification (PMP, PRINCE2, or equivalent) and/or formal M&amp;E training is an advantage.</li></ol><p><br />&nbsp;</p><p>The selected individual consultant <strong>will be based in the Jakarta (Indonesia) </strong>office.</p><p><br />&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank&rsquo;s&nbsp; Procurement&nbsp; Regulations&nbsp; for&nbsp; IPF&nbsp; Borrowers&nbsp; July&nbsp; 2016,&nbsp; revised&nbsp; November&nbsp; 2017,&nbsp; July&nbsp; 2018, November 2020, and September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest<em>.</em></p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Individual Consultant Selection method set out in the</p><p>Procurement Regulations.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours (09.00 to 17.00 GMT+7). Interested applicant must be submit the comprehensive curriculum vitae of individual consultant before Monday, October 4, 2026&nbsp; at 12.00 WIB to the following address: <u>ulp@bappenas.go.id</u>.&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;Jakarta, 24 September 2026</p><p>&nbsp;</p><p>Pokja Transportation Project Management and Monitoring Evaluation Specialist</p><p>Unit Kerja Pengadaan Barang dan Jasa</p><p>Kementerian Perencanaan Pembangunan Nasional</p><p>Jl. Taman Suropati No.2 Menteng Jakarta Pusat</p><p>E-mail: <u>ulp@bappenas.go.id</u></p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00474148","notice_type":"Request for Expression of Interest","noticedate":"09-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-23T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Eswatini","project_id":"P507360","project_name":"Eswatini Youth Employment Opportunities Project","bid_reference_no":"SZ-EWADE-549413-CS-QCBS","bid_description":"Procurement of business development consultancy services","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"EWADE Building - Along MR8, Siphofaneni\nKingdom of Eswatini","contact_ctry_name":"Eswatini","contact_email":"nelisiwe@ewade.co.sz","contact_name":"Nelisiwe Maziya","contact_organization":"Eswatini Water and Agricultural Development Enterprise","contact_phone_no":"+26878090508","contact_web_url":"www.ewade.co.sz","submission_date":"2026-10-09T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES -</strong><strong> </strong><strong>PROVISION OF END-TO-END BUSINESS DEVELOPMENT SERVICES- FIRMS SELECTION)</strong></p><p><strong>Ref No:</strong> EWADE /0796</p><p><strong>COUNTRY: </strong>Kingdom of Eswatini</p><p><strong>NAME OF PROJECT: </strong>Eswatini Youth Employment Opportunities project (P507360)</p><p>Loan No./Credit No./ Grant No.: IDA Credit No. 77910 (IDA Credit)&nbsp;</p><p><strong>Assignment Title: </strong>Procurement of consulting services for end-to-end business development services (BDS) Providers to Support Youth Employment under the Eswatini Youth Employment Opportunities Project (EYEOP)</p><p><strong>Reference No</strong>. (as per Procurement Plan): SZ-EWADE-549413-CS-QCBS&nbsp;</p><p>1. The Government of the Kingdom of Eswatini, has received financing from the World Bank towards the cost of the implementation of the Eswatini Youth Employment Opportunities Project (EYEOP), and intends to apply part of the proceeds for consulting services.</p><p>The Eswatini Youth Employment Opportunities Project is a five-year, national, multi-sectoral initiative that seeks to expand income-earning opportunities for Eswatini youth by strengthening employability, promoting entrepreneurship and supporting inclusive, resilient livelihoods. The Project delivers an economic inclusion package comprising market-relevant skills training, business development support, access to finance and integration into value chains, and is implemented through three components, including Component 1: Youth Income-Earning Opportunities, under which Sub-component 1.1 (Income-Earning Opportunities for Youth in Agriculture), led by the Eswatini Water and Agricultural Development Enterprise (EWADE), targets 20,000 youth (at least 50% female, 5% disabled) in agriculture and related value chains.</p><p>The consulting services comprise of the provision of end-to-end Business Development Service Providers to support youth participation in priority agricultural and agribusiness value chains under Sub-component 1.1 (Youth Income-Earning Opportunities) of EYEOP. The Services will support eligible youth through an integrated pathway covering value chain intelligence and market analysis; beneficiary profiling and pathway allocation; socio-emotional, entrepreneurship, technical and business skills development; business planning and enterprise establishment; finance readiness and access productive finance; market linkages and value chain facilitation; mentorship, coaching and aftercare support; and monitoring, quality assurance and performance monitoring.</p><p>The services will focus on prioritized value chain including selected commodities across vegetables, field crops, small ruminants, poultry and aquaculture sub-sectors.</p><p>The assignment is expected to commence upon contract signature and will be implemented throughout the EYEOP implementation period, in accordance with approved Annual Work Plan and Budgets (AWPB). The engagement will initially be for one (1) year, with the possibility of annual renewal, subject to satisfactory performance, achievement of agreed deliverables and performance targets, availability of funding and continue need for the services.</p><p>2. The Terms of Reference for the primary procurement stage for the assignment are attached to this request for expressions of interest in Annex 1.</p><p>3. The Eswatini Water and agricultural development Enterprise invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><ul><li>Core business and institutional experience: Demonstrated core business in business development services, enterprise development, business advisory services, entrepreneurship development, skills development, training, mentorship, market linkage facilitation or related areas relevant to the assignment.</li><li>Relevant assignment experience: Successful completion of at least one (1) assignment of similar nature, scope and complexity within the last five (5) years, demonstrating experience in the delivery of BDS, enterprise development, youth entrepreneurship, business advisory services, training, mentorship, market linkages or related services.</li><li>Experience in youth and enterprise development: Demonstrated experience in implementing youth entrepreneurship, employment, skills development or economic inclusion programmes, including support to emerging and/or existing enterprises.</li><li>Agriculture, agribusiness and value-chain experience: Demonstrated experience in agriculture, agribusiness or related value-chain development, including facilitating linkages between smallholder farmers or enterprises and buyers, aggregators, processors, financial institutions, input suppliers or other private-sector actors.</li><li>Financial and business development experience: Demonstrated institutional experience in financial literacy, finance readiness, business planning, enterprise financing and/or agriculture and value-chain financing.</li><li>Geographic and contextual experience: Demonstrated experience working in Eswatini and/or Southern Africa, with an understanding of the regional agricultural, youth employment, entrepreneurship and enterprise-development context.</li><li>Technical and operational capacity: Demonstrated institutional capacity, systems and operational reach to deliver integrated BDS at the scale envisaged under EYEOP, including the ability to mobilize and manage appropriate technical resources, delivery personnel, logistics, data-management systems and quality-assurance arrangements.</li><li>Experience in inclusive and sustainable development approaches: Demonstrated experience integrating gender, youth inclusion, disability inclusion, climate resilience, climate-smart agriculture, environmental sustainability or related cross-cutting considerations into programme delivery.</li><li>Development programme experience: Experience implementing donor-funded, government-funded or multi-stakeholder development programmes will be considered an advantage.</li></ul><p>Key Experts will not be evaluated at the shortlisting stage. Their qualifications and experience will be assessed at the Request for Proposals (RfP) stage in accordance with the applicable evaluation criteria.</p><p>4. The shortlist will contain 5 to 8 firms.</p><p>5. Consultants are required to further submit the following eligibility documents:</p><ul><li>Valid Tax Compliance Certificate</li><li>Valid Trading License</li><li>Certificate of Incorporation</li><li>Forms J and C</li><li>Audited Financial statements</li><li>Valid ENPF Compliance Certificate</li><li>Copies of Company Director IDs certified</li><li>Affidavit or Police Clearance for Company Directors</li><li>Expression of interest form (Form 1)</li><li>Company Profile</li><li>Relevant Experience</li><li>CVs of Key Personnel</li></ul><p>6. The attention of interested Consultants is drawn to Section III, paragraphs, 3.15 and 3.16 of the World Bank Procurement Regulations for IPF Borrowers, September 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to the following specific information on conflict of interest related to this assignment:</p><p>&nbsp;</p><p>Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Borrower. Without limitation on the generality of the foregoing, Consultants shall not be hired under the circumstances set forth below:</p><p>a) a firm that has been engaged by the Borrower to provide Goods, Works, or Non-Consulting Services for a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), shall be disqualified from providing Consulting Services resulting from, or directly related to, those Goods, Works, or Non-Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract;</p><p>b) a firm that has been engaged by the Borrower to provide Consulting Services for the preparation or implementation of a project (or an affiliate that directly or indirectly controls, is controlled by, or is under common control with that Consulting firm), shall be disqualified from subsequently providing Goods, Works, or Non-Consulting Services resulting from, or directly related to those Consulting Services. This provision does not apply to the various firms (Consultants, contractors, or suppliers), which together are performing the contractor&rsquo;s obligations under a turnkey or design and build contract;</p><p>c) neither a Consultant (including personnel and sub-consultants), nor an affiliate (that directly or indirectly controls, is controlled by, or is under common control with that Consultant), shall be hired for any assignment that, by its nature, creates a conflict of interest with another assignment of the Consultant;</p><p>d) Consultants (including their experts and other personnel, and sub-consultants), that have a close business or family relationship with a professional staff of the Borrower, or of the project implementing agency, or of a recipient of a part of the Bank&rsquo;s financing, or any other party representing or acting on behalf of the Borrower, that is directly or indirectly involved in any part of:</p><p>i. the preparation of the ToR for the assignment;</p><p>ii. the selection process for the contract; or</p><p>iii. the supervision of the contract;</p><p>may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.</p><p>7. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. &nbsp;</p><p>8. A Consultant will be selected in accordance with the Quality and Cost-based Selection (QCBS) method described in the Procurement Regulations and to be specifically set out in the Request for Proposals.</p><p>9. Any request for clarification on this EOI should be sent via e-mail to the address below no later than 16h00, 16th October 2026 GMT+2. The client will provide responses to all clarification requests by 16h00, 19th October 2026 GMT+2.</p><p>10. Expressions of interest must be delivered in a written form to the address below, in a SEALED ENVELOPE LABELLED, &ldquo;<strong>Expression of Interest - Consulting Services for Provision of End-To-End Business Development Services</strong>&rdquo;, in person or by email not later than 16h00, 23rd October 2026. Email submissions can be sent to tenders@ewade.co.sz. &nbsp;</p><p><em>Eswatini Water and Agricultural Development Enterprise</em></p><p><em>Attn: The Tender Board Chairperson</em></p><p><em>Box 198 Siphofaneni </em></p><p><em>EWADE Building, along MR8, Siphofaneni,</em></p><p><em>M214 Siphofaneni, Eswatini</em></p><p>Tel: +268 24118600</p><p>E-mail: <em>tenders@ewade.co.sz</em></p><p>&nbsp;</p><p><strong>FORM 1: EXPRESSION OF INTEREST SUBMISSION FORM</strong></p><p><em>[Location, date]</em></p><p><em>[Authorized official]</em></p><p><strong>Re: Consulting Services for Provision of End-to-End Business Development Services</strong></p><p>We, the undersigned, having reviewed the Request for Expressions of Interest and the attached Terms of Reference (Annex 1) for the above-referenced assignment, hereby submit our Expression of Interest for consideration for inclusion in the prequalification of Business Development Service providers.</p><p>We declare that the information and statements made in this form, and in the documents accompanying it, are true and correct to the best of our knowledge. We understand that any misrepresentation may result in disqualification of our Expression of Interest or, if discovered after selection, this may result in the termination of our engagement in accordance with the terms of the Agreement.</p><p><strong>Section 1: Applicant Firm Details</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:680px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:33px; vertical-align:top; width:257px\"><p><strong>Legal Name of Firm</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Company Registration Number </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Country / Place of Registration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Type of Entity</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Year Established</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Physical Address</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Postal Address</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:257px\"><p><strong>Contact Person (Name &amp; Position)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Email Address</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:257px\"><p><strong>Telephone Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:33px; vertical-align:top; width:423px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 2: Submission Arrangement Declaration</strong></p><p>Please indicate the basis on which this Expression of Interest is submitted:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:578px\"><p><strong>Submission arrangement</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:101px\"><p><strong>Tick </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:578px\"><p>We are submitting this Expression of Interest as a single firm.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:101px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:26px; vertical-align:top; width:578px\"><p>We are submitting this Expression of Interest as a Joint Venture (all partners jointly and severally liable).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:26px; vertical-align:top; width:101px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:578px\"><p>We are submitting this Expression of Interest with the intention of engaging sub-consultant(s).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:101px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>If submitted as a Joint Venture or with sub-consultants, list all firms below:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:680px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:43px; vertical-align:top; width:302px\"><p><strong>Name of Firm</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; vertical-align:top; width:198px\"><p><strong>Role (Lead / Partner / Sub-consultant)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; vertical-align:top; width:180px\"><p><strong>Country of Registration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:302px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:198px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:34px; vertical-align:top; width:180px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:302px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:198px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:180px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 3: Conflict of Interest Declaration</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:680px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:95px; vertical-align:top; width:680px\"><p> We confirm that neither our firm, its affiliates, nor any proposed sub-consultant falls within any of the conflict-of-interest circumstances described in paragraphs 3.15 and 3.16 of the World Bank Procurement Regulations for IPF Borrowers (September 2025) and Section 5 of the Request for Expressions of Interest.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:680px\"><p> A potential conflict of interest exists and is described below.</p></td></tr></tbody></table><p>If a potential conflict exists, describe it here: ___________________________________________________________________________________</p><p>___________________________________________________________________________________</p><p>___________________________________________________________________________________</p><p><strong>Section 4: Summary of Relevant Experience</strong></p><p>List at least two comparable assignments completed within the last five to ten years. Attach additional sheets if necessary.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:681px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:132px\"><p><strong>Assignment Name</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:120px\"><p><strong>Client / Funder</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:98px\"><p><strong>Duration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:101px\"><p><strong>Contract Value</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:230px\"><p><strong>Relevance to this Assignment</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:132px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:98px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:101px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:230px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:132px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:98px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:101px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:230px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 5: Key Personnel</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:677px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:208px\"><p><strong>Name</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:157px\"><p><strong>Proposed Role</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:157px\"><p><strong>Highest Qualification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:157px\"><p><strong>Years of Relevant Experience</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:208px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:208px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:157px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:208px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:157px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 6: Eligibility Documents Checklist</strong></p><p>Please confirm that the following documents are attached to this submission:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:680px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:24px; vertical-align:top; width:539px\"><p><strong>Eligibility Document</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:24px; vertical-align:top; width:142px\"><p><strong>Attached (Tick)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Valid Tax Compliance Certificate</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Valid Trading License</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Certificate of Incorporation</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Forms J and C</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Audited Financial statements</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Valid ENPF Compliance Certificate</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Copies of Company Director IDs certified</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Affidavit or Police Clearance for Company Directors</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Letter of Interest</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Company Profile</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:539px\"><ol><li>Relevant Experience</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:25px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:539px\"><ol><li>CVs of Key Personnel</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; vertical-align:top; width:142px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 8: Undertaking and Signature</strong></p><p>We understand that this Expression of Interest does not constitute a binding offer and does not oblige EWADE to shortlist, prequalify, or contract our firm. We undertake, if invited, to participate in good faith in the subsequent Request for Proposals stage of the procurement process.</p><p><strong>For and on behalf of: </strong>_______________________________</p><p>&nbsp;</p><p><strong>Signature: </strong>________________________________________</p><p>&nbsp;</p><p><strong>Full Name: </strong>_______________________________________</p><p>&nbsp;</p><p><strong>Position: </strong>_________________________________________</p><p>&nbsp;</p><p><strong>Date: </strong>____________________________________________</p><p>&nbsp;</p><p><strong>ANNEX 1: Terms of Reference</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Provision of End-to-End Business Development Services</strong></p><p><em>(Business Development Management Support TA)</em></p><p><strong>Eswatini Youth Employment Opportunities Project (EYEOP)</strong></p><p><strong>1. Background</strong></p><p>The Kingdom of Eswatini faces persistent challenges of high youth unemployment, limited formal-sector job creation and widespread poverty, particularly in rural areas. Women, youth with disabilities, youth who are not in education, employment or training, and youth engaged in low-productivity activities face additional barriers to productive opportunities.</p><p>The Eswatini Youth Employment Opportunities Project (EYEOP) is a five-year national, multisectoral initiative supported by the World Bank to expand income-earning opportunities for youth. The Project combines market-relevant skills, entrepreneurship and business development support, productive start-up support, access to finance, mentorship, and integration into agricultural and related value chains.</p><p>Under Subcomponent 1.1, EWADE will support 20,000 youth in agriculture and related value chains, with at least 50 percent women. The beneficiary pathway covers socio-emotional and mindset-change support, technical and business skills, business planning, productive grants where applicable, enterprise development, market or employment linkages, mentorship and post-support monitoring.</p><p>The assignment will focus on Government-prioritized value chains: vegetables (onions, potatoes, tomatoes and baby vegetables), dry beans, small ruminants, poultry and aquaculture. Youth opportunities may cover on-farm production and off-farm activities such as input supply, nurseries and hatcheries, aggregation, logistics, processing, mechanization, e-extension, e-commerce and related business services.</p><p><strong>2. Objective of the Assignment</strong></p><p>The overall objective is to engage a qualified BDS Provider to deliver a comprehensive, demand-driven and results-oriented package that enables eligible youth to establish, improve, sustain and grow viable enterprises or access wage-employment opportunities, while contributing to measurable improvements in employment, income, productivity, market participation and resilience.</p><p>The specific objectives are to:</p><ul><li>Profile beneficiaries and allocate them to suitable employment, enterprise, on-farm or off-farm pathways.</li><li>Strengthen technical, socio-emotional, entrepreneurship, business-management, financial and digital capabilities.</li><li>Support viable business planning, enterprise establishment, operational improvement and growth.</li><li>Improve finance readiness and facilitate appropriate access to productive grants or other finance.</li><li>Facilitate sustainable market, value-chain and employment linkages.</li><li>Provide structured mentorship and generate reliable beneficiary-level performance evidence.</li></ul><p><strong>3. Scope of Services</strong></p><p>Under Subcomponent 1.1, the BDS Provider shall provide training, capacity building and mentoring services to support EWADE in the design and implementation of economic inclusion interventions. The Consulting Firm shall undertake the following major tasks:</p><p><strong>3.1 BDS Package Design, Curriculum Review and Pilot Testing</strong></p><p>The Provider shall establish an EYEOP-approved BDS package that is practical, interactive, youth-centred and tailored to beneficiary needs and priority value chains. Existing local and international good-practice content shall be used as the starting point for customization rather than developing all content from first principles.</p><ul><li>Review existing BDS, entrepreneurship, business-management, socio-emotional, financial-literacy, digital-skills, technical-training and mentorship materials.</li><li>Assess suitability for NEET youth, vulnerable informal workers, women and youth with disabilities, and identify gaps requiring adaptation or additional modules.</li><li>Customize content to EYEOP pathways, priority value chains, the Eswatini market context, beneficiary literacy levels and language needs.</li><li>Develop clear learning objectives, session plans, practical exercises, participant outputs, assessment methods, facilitator manuals, participant materials and a structured mentorship guide.</li><li>Pilot the package with an agreed beneficiary group; assess content, language, timing, accessibility and practicality; document findings and revise the package before EWADE approval.</li></ul><p><strong>3.2 Youth Mobilization, Communication, Profiling and Pathway Allocation</strong></p><ul><li>Support awareness, beneficiary communication, registration and screening in accordance with Project eligibility and targeting requirements.</li><li>Assess skills, interests, aspirations, productive assets, constraints, readiness, entrepreneurial potential and relevant labour-market or value-chain characteristics.</li><li>Match beneficiaries to wage-employment, self-employment, on-farm or off-farm pathways and identify required technical training, enterprise support and reasonable accommodations.</li><li>Communicate schedules, participation requirements and logistics through appropriate approved channels.</li><li>Maintain accurate profiles, selection records and pathway-allocation data in formats compatible with the EYEOP MIS.</li></ul><p><strong>3.3 Socio-Emotional, Mindset, Life and Business Skills Training</strong></p><ul><li>Deliver practical training in initiative, confidence, resilience, goal-setting, problem-solving, communication, adaptability and decision-making.</li><li>Address gender-related, household, cultural, disability-related or other barriers affecting participation and enterprise performance.</li><li>Deliver business-model development, customer identification, marketing, costing, pricing, record keeping, cash-flow management and financial literacy.</li><li>Use experiential methods, including demonstrations, case studies, role play, group work and application to a beneficiary&rsquo;s own business or employment pathway.</li><li>Ensure training is accessible and adapted to education, literacy, language and disability needs.</li></ul><p><strong>3.4 Technical and Competency-Based Training</strong></p><ul><li>Deliver technical training relevant to the selected priority value chain and pathway, aligned with applicable DIVT or other competent standards.</li><li>Provide practical and experiential learning suited to the selected commodity, occupation or business opportunity.</li><li>Integrate climate-smart agriculture, green business practices, food safety, quality standards and appropriate digital agriculture solutions.</li><li>Support competency assessment and certification in coordination with relevant institutions.</li><li>Align delivery with production calendars, market cycles and employment demand where applicable.</li></ul><p><strong>3.5 Enterprise Development and Business Start-Up Support</strong></p><ul><li>Validate enterprise opportunities against market demand, competition, costs, risks and beneficiary capabilities.</li><li>Support business models, enterprise profiles, business plans, production and marketing plans, budgets, cash-flow forecasts and growth plans.</li><li>Provide incubation, business advisory, coaching and technical support during establishment and early operations.</li><li>Support formalization, governance, compliance, record keeping, productivity, innovation, digital adoption and climate resilience where relevant.</li><li>Assess enterprise-specific technical, operational, financial and market constraints and coordinate referrals to suitable specialist services.</li><li>Support enterprises to improve operational continuity, sales, customer retention, market access, income and employment creation.</li></ul><p><strong>3.6 Finance Readiness and Productive Resource Management</strong></p><ul><li>Conduct finance-readiness assessments and support grant applications, budgets, cash-flow projections, investment cases and financing plans.</li><li>Explain eligibility and application requirements for Project grants and other relevant financing.</li><li>Facilitate linkages with financial institutions, investors and financing providers without influencing third-party decisions or representing finance as guaranteed.</li><li>Strengthen responsible use of grants and other finance through budgeting, basic financial management and record keeping.</li><li>Track referrals, applications, approvals, financing accessed, reasons for rejection and use of finance where required.</li></ul><p><strong>3.7 Market, Value-Chain and Employment Linkages</strong></p><ul><li>Identify viable commercial and employment opportunities based on market demand, value-chain requirements and beneficiary capabilities.</li><li>Maintain an engagement pipeline of buyers, employers, processors, aggregators, exporters, retailers, lead firms and other relevant market actors.</li><li>Facilitate supplier relationships, off-take arrangements, aggregation, contract farming, buyer-seller engagement, trade events and employment placement.</li><li>Support beneficiaries to meet quality, volume, reliability, packaging, certification, pricing and delivery requirements.</li><li>Facilitate access to inputs, equipment, logistics, extension, mechanization, digital market access and other services needed for sustainable participation.</li></ul><p><strong>3.8 Mentorship, Coaching and Post-Support Follow-Up</strong></p><ul><li>Establish a structured mentorship and coaching system appropriate to beneficiary pathways and enterprise stages.</li><li>Recruit, assess and train mentors under EWADE-approved requirements and maintain a qualified mentor roster.</li><li>Match beneficiaries with suitable entrepreneurs, business owners, technical specialists, extension officers, employers or private-sector mentors.</li><li>Provide individual and group coaching during critical production, operational, marketing and business-growth stages.</li><li>Use a structured guide, session plans, action plans, attendance records and follow-up logs; monitor mentor performance and replace underperforming personnel.</li><li>Conduct agreed tracer and follow-up activities to assess enterprise operation, employment, income, sales, productivity and sustainability.</li></ul><p><strong>3.9 Monitoring, Quality Assurance, Learning and Adaptive Management</strong></p><ul><li>Maintain complete beneficiary and service-delivery records interoperable with the EYEOP MIS and submit data in prescribed formats and frequencies.</li><li>Track agreed output and outcome indicators, including completion, enterprise establishment and survival, market participation, finance, employment, income, sales, productivity and jobs.</li><li>Undertake quality assurance of curricula, trainers, mentors, venues, materials, attendance, accessibility and beneficiary experience.</li><li>Collect beneficiary feedback and satisfaction data; maintain supporting evidence; perform data-quality checks; and implement corrective actions.</li><li>Document implementation lessons, innovations, constraints and emerging risks for each cohort or service cycle and submit evidence-based recommendations.</li><li>Record and refer complaints through the Project grievance mechanism and comply with environmental and social, safeguarding, anticorruption, confidentiality and data-protection requirements.</li></ul><p><strong>4. Methodology &amp; Workplan</strong></p><p>The TOR defines the mandatory service requirements, minimum standards, outputs and intended results. The Provider shall propose the detailed methodology, staffing deployment, sequencing, tools, logistics and quality-assurance arrangements in its technical proposal. The approach shall demonstrate how all service areas will be integrated into a coherent beneficiary journey rather than delivered as disconnected activities.</p><p>Delivery shall be organized around defined beneficiary cohorts or service cycles. The contract will specify the number and profile of beneficiaries, geographic coverage, value chains, pathway mix, delivery period, required modules, mentorship frequency, service standards, deliverables, indicators and verification requirements. Training, enterprise support and mentoring shall be aligned with agricultural production calendars, market cycles and relevant employment demand.</p><p>The detailed methodology shall be finalized during inception with EWADE. Adjustments may be proposed during implementation in response to beneficiary needs and evidence, but shall require written approval and shall not reduce agreed coverage, service quality, outputs, results, safeguards or contractual accountability.</p><p><strong>4.1. Delivery and Contracting Model</strong></p><p>An applicant may participate as:</p><ul><li>A single firm possessing the required end-to-end capabilities; or</li><li>A joint venture or consortium with complementary capabilities, with a clearly defined Lead Firm supported by formally identified specialist subcontractors or technical partners.</li></ul><p>The Lead Firm shall enter into the contract with EWADE and assume full responsibility for end-to-end delivery, coordination, quality assurance, reporting, fiduciary compliance, risk management, safeguarding, data quality and achievement of all contracted outputs and results. The proposal shall identify each participating entity, its legal relationship to the Lead Firm, its role, the services it will provide, key personnel, coordination arrangements and the mechanism for managing performance and risks across the delivery chain.</p><p>EWADE will hold the Lead Firm accountable and will not separately manage consortium members, subcontractors or specialist partners. The Lead Firm shall consolidate all work plans, reports, invoices, evidence and communications; monitor the performance of participating entities; address delivery failures; and ensure consistent service standards. Any material change in consortium membership, specialist arrangements, key responsibilities or proposed personnel shall require prior written approval by EWADE.</p><p><strong>4.2 Performance Review and Adaptive Management</strong></p><p>Performance shall be reviewed for each cohort or service cycle against agreed service standards, output quality, beneficiary satisfaction, data quality, safeguarding compliance, market or employment linkage performance and outcome indicators measurable within the review period.</p><p>A broader implementation review shall be undertaken after the initial six months, or at another point specified in the contract, to assess the effectiveness of the integrated delivery model, coordination arrangements, beneficiary progression and the Lead Firm&rsquo;s management of participating entities. EWADE may require a corrective action plan, enhanced supervision, replacement of personnel, revised sequencing or other reasonable adjustments within the contract. Any adjustment shall preserve the agreed objectives and the Lead Firm&rsquo;s unified accountability.</p><p><strong>5. Expected Outputs and Performance Framework</strong></p><p>The assignment shall use results-based performance management. Performance will be assessed on delivery of contracted outputs and measurable contributions to agreed employment, enterprise, income and market outcomes. The Provider shall not be evaluated solely on the number of activities conducted. The contract shall distinguish between outputs within the Provider&rsquo;s direct control and outcome indicators to which the Provider contributes.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><thead><tr><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:12%\"><p><strong>Level</strong></p></td><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:42%\"><p><strong>Illustrative indicator</strong></p></td><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:45%\"><p><strong>Means of verification</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Output</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Youth contacted, screened, profiled and allocated to pathways</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Beneficiary database, profiling and allocation records</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Output</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Youth completing required BDS and technical training</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Attendance, assessment, completion and certification records</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Output</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Business plans, enterprise profiles and finance packages completed</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Approved plans, readiness assessments and application records</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Output</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Youth receiving mentorship and market or employment linkage support</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Session logs, action plans, buyer/employer and linkage evidence</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Outcome</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Supported enterprises established and operational after support</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Enterprise verification and tracer data</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Outcome</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Youth securing employment or improving enterprise performance and income</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Employment records, enterprise data, surveys and verification</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:12%\"><p>Outcome</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:42%\"><p>Jobs created or sustained by supported enterprises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:45%\"><p>Enterprise records and beneficiary verification</p></td></tr></tbody></table><p>Assignment-specific definitions, targets, baselines where applicable, disaggregation, reporting frequencies and means of verification will be finalized in the RfP and contract and aligned with the EYEOP Results Framework and M&amp;E Plan.</p><p><strong>6. Deliverables and Reporting Requirements</strong></p><p>The Consulting Firm shall produce the following outputs to deliver business development services for the enrolled youth beneficiaries:</p><table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><thead><tr><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:26%\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:44%\"><p><strong>Minimum content</strong></p></td><td style=\"background-color:#1f4e78; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:29%\"><p><strong>Indicative timing</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Inception Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Cohort plan, staffing, consortium roles, methodology, schedule, logistics, communications, risk, QA, MIS and reporting</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>At commencement</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>BDS Package</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Curriculum review, adapted package, manuals, tools, mentorship guide, pilot findings and approved revision</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Before scale delivery</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Training Outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Plans, attendance, assessments, participant products, certification and QA evidence</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Per delivery block</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Enterprise and Finance Outputs</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Profiles, business plans, readiness assessments, finance packages, incubation and advisory records</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Per cohort/pathway</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Market and Employment Outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Engagement pipeline, commercial arrangements, linkage and placement evidence</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Per market cycle</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Mentorship Outputs</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Mentor roster, matching, session logs, action plans and progression assessments</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Monthly/per cycle</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Performance Reports</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>MIS data, indicator evidence, data quality, risks, grievances, corrective actions and lessons</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Monthly/quarterly</p></td></tr><tr><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:26%\"><p>Completion and Final Reports</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:44%\"><p>Cohort results, tracer evidence, lessons, recommendations, datasets, tools and handover</p></td><td style=\"background-color:#eaf1f8; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:29%\"><p>Per cohort/final</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>7. Schedule and Duration</strong></p><p>The services will commence upon contract signature and will be delivered throughout the implementation period of the Eswatini Youth Employment Opportunities Project (EYEOP), in accordance with approved Annual Work Plans and Budgets, applicable project implementation arrangements and the performance requirements specified in the contract.</p><p>The engagement will be structured as a performance-based contract, initially covering one year and renewable annually, subject to satisfactory performance, achievement of agreed deliverables and performance targets, availability of funding and the continued need for the services. Subject to these conditions, the contract may be renewed on an annual basis for the duration of the EYEOP implementation period</p><p>The BDS Provider will be expected to provide services on a demand-driven and continuous basis, responding to the evolving needs of participating youth and the implementation schedule of the project. Key areas of service delivery will include:</p><ol><li>Mobilization and onboarding: Support the profiling, assessment and onboarding of participating youth into the relevant EYEOP economic inclusion and entrepreneurship interventions.</li><li>Business assessment and planning: Conduct business diagnostics, develop or strengthen business plans and profiles, and support beneficiaries to develop viable and market-oriented enterprises.</li><li>Capacity building and incubation: Deliver tailored business development training, coaching, mentorship, incubation and other technical assistance required to strengthen youth-owned enterprises.</li><li>Enterprise development and growth support: Provide ongoing technical assistance to supported enterprises, including support for implementation, business formalization, financial management, productivity improvement and enterprise growth.</li><li>Market and value-chain linkages: Facilitate linkages with buyers, lead firms, financial institutions, input suppliers, service providers and other relevant market actors to enhance access to markets and sustainable business opportunities.</li><li>Performance monitoring and reporting: Monitor beneficiary and enterprise performance against agreed indicators and targets, and submit periodic reports demonstrating progress, results, challenges, corrective actions and lessons learned.</li><li>Continuous improvement and adaptive support: Adjust the nature and intensity of BDS support based on beneficiary performance, emerging needs, project priorities, market conditions and lessons from implementation.</li></ol><p>The specific annual deliverables, targets, timelines and performance indicators will be agreed with the EYEOP implementing agency at the commencement of each contract year and may be reviewed periodically to reflect the project&#39;s implementation priorities.</p><p>Continuation or renewal of the services will be subject to satisfactory performance against the agreed performance indicators and deliverables, compliance with contractual and project requirements, availability of funds, and approval in accordance with applicable procurement and project procedures. The sequence and timing of individual BDS activities may therefore vary during the project period depending on beneficiary needs, project implementation progress and approved annual work plans.</p><p><strong>8. Team Composition</strong></p><p>The Consultant shall propose suitably qualified key experts, including a Task Team Leader/BDS Team Leader; Agriculture Production, Agribusiness and Value Chain Expert, Training, Skills and Youth Development Expert; Market Systems and Private Sector Linkages Expert; Finance and Investment Readiness Expert, MEL/Data Management Expert, Digital Agriculture and Innovation Expert as well as Gender, Social Inclusion and Environment Safeguards Expert. For each proposed expert, the Consultant shall provide the key responsibilities, academic and professional qualifications, relevant professional experience, experience in assignments of similar nature and complexity, proposed level of effort expressed in person-months and/or percentage of time, and availability for the assignment.</p><p><strong>9. Firm Qualifications and Experience</strong></p><p>The applicant shall demonstrate relevant institutional experience, technical expertise, operational capacity and systems relevant to deliver EYEOP Business Development Services. As a minimum mandatory requirement, the applicant shall have successfully completed at least one (1) assignment of similar nature, scope and complexity within the last five (5) years. The assignment shall demonstrate relevant experience in the delivery of BDS, enterprise development, youth entrepreneurship, business advisory services, training, mentorship, market linkages or related services.&nbsp; In addition to the mandatory minimum requirement above, the applicant shall demonstrate the following relevant institutional experience, technical expertise and operational capacity:</p><ul><li>Proven experience in delivering BDS, enterprise development, business advisory services, mentoring and coaching, including supporting emerging and existing entrepreneurs to establish, grow and sustain viable businesses across multiple sectors</li><li>Demonstrated experience implementing youth entrepreneurship, employment or skills development programmes.</li><li>Demonstrated experience in facilitating partnerships and establishing market linkages between smallholder farmers and buyers, aggregators and other private sector actors.</li><li>Demonstrated Experience in financial literacy, financial readiness and agriculture/value chain financing.</li><li>Proven experience implementing donor-funded, government-funded, or multi-stakeholder development programmes will be considered an advantage.</li><li>Demonstrated experience working in Eswatini and/or Southern Africa, with a sound understanding of the local agricultural, youth and enterprise development context.</li><li>Demonstrated experience integrating gender, youth, disability inclusion, climate-smart agriculture and green business practices.</li><li>Demonstrated adequate technical, financial and operational capacity to deliver BDS at the scale envisaged under EYEOP.</li></ul><p><strong>10. Environmental, Social Framework (ESF) Requirements</strong></p><p>The assignment shall comply with the World Bank Environmental and Social Framework (ESF) and applicable national requirements as referenced in the Project Appraisal Document (PAD), with responsibilities proportionate to the Training, Capacity Building, and Mentoring category for delivery of business development services supporting income earning opportunities for youth under the EYEOP.</p><ul><li>Comply with the World Bank Environmental and Social Framework, applicable national requirements and relevant Project instruments.</li><li>Apply gender-responsive and disability-inclusive approaches and provide agreed reasonable accommodations.</li><li>Integrate climate resilience, occupational health and safety, stakeholder engagement and beneficiary feedback into service delivery.</li><li>Record, refer and report grievances through the Project grievance mechanism and ensure personnel comply with safeguarding requirements and codes of conduct.</li><li>Protect beneficiary information, maintain required disaggregation and ensure confidentiality and data-protection obligations extend to consortium members and subcontractors.</li></ul><p><strong>11. Reporting Lines</strong></p><p>The Lead Firm shall enter into the contract with EWADE and report to EWADE for all activities under this assignment, assuming full responsibility for end-to-end delivery, coordination, reporting and achievement of contracted outputs and results.</p><ul><li>Accountability: EWADE will hold the Lead Firm accountable and will not separately manage consortium members, subcontractors or specialist partners. The Lead Firm shall consolidate all work plans, reports, invoices, evidence and communications; monitor the performance of participating entities; address delivery failures; and ensure consistent service standards.</li><li>EWADE responsibilities: EWADE will confirm beneficiary cohorts and targets; provide or facilitate access to applicable Project documents, beneficiary information and systems; designate technical and contract-management focal points; coordinate relevant Government stakeholders; review deliverables; monitor service quality; and verify performance.</li><li>Provider responsibilities: The Lead Firm shall provide all personnel, specialist inputs, logistics, equipment, materials, communication and management systems required for delivery unless otherwise stated in the contract. It shall maintain complete technical, financial and beneficiary records and make them available for supervision, audit and verification. It shall promptly report material delays, safeguarding issues, fiduciary concerns or other risks requiring management attention.</li><li>Escalation and corrective action: Where a broader implementation review identifies performance concerns, EWADE may require a corrective action plan, enhanced supervision, replacement of personnel, revised sequencing or other reasonable adjustments within the contract, preserving the agreed objectives and the Lead Firm&#39;s unified accountability.</li></ul><p><strong>11. Proposal and Evaluation Requirements</strong></p><p>The technical proposal shall explain the applicant&rsquo;s understanding of the assignment; integrated methodology; beneficiary profiling and pathway allocation; training, enterprise, finance, market, mentorship and M&amp;E approaches; staffing and deployment; consortium governance; geographic capacity; quality assurance; risks and safeguards; output verification; and relevant past performance.</p><p>Evaluation shall consider capacity to manage the full beneficiary journey, the credibility and complementarity of any consortium arrangement, methodology, qualifications of key personnel, delivery and monitoring systems, relevant experience, financial and operational capacity, and value for money.</p><p><strong>12. Payment Terms&nbsp;</strong></p><p>Payments shall be output-based and linked, as appropriate, to accepted deliverables, verified service delivery and verified performance results. The payment structure shall clearly distinguish inputs, outputs and outcomes and shall not reimburse consultant time without a corresponding accepted deliverable or contracted service result unless expressly provided in the contract.</p><p>The RfP and contract shall define each payment milestone, indicator definition, target, acceptance criterion, evidence requirement, verification method, payment trigger and treatment of incomplete or non-conforming outputs. Where payment is calculated per beneficiary, it shall be based on the verified number receiving the contracted package and satisfying applicable service-verification requirements. Submission of a report alone will not constitute acceptance where the underlying service or beneficiary-level evidence cannot be verified.</p><p>EWADE may verify reported outputs and results through document review, MIS checks, site visits, beneficiary confirmation, attendance validation, data-quality assessments, financial review or independent verification. All payments will be subject to written acceptance by the authorized EWADE representative and applicable contractual and fiduciary requirements.</p><p><strong>13. Items to be Finalized in the RfP and Contract</strong></p><ul><li>Final beneficiary volumes, geographic coverage, cohorts, value chains, duration and delivery calendar.</li><li>Detailed outputs, targets, indicators, acceptance criteria, verification arrangements and reporting schedule.</li><li>Final payment milestones and any performance-linked share.</li><li>Key experts, minimum inputs, service standards, logistics and implementation milestones.</li><li>MIS protocols, applicable environmental and social instruments, data requirements and client inputs.</li><li>Provisions governing the Lead Firm, consortium members, specialist subcontractors, substitutions, remedies and termination.</li></ul><p>&nbsp;</p>"},{"id":"OP00473648","notice_type":"Request for Expression of Interest","noticedate":"07-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-28T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Malawi","project_id":"P505187","project_name":"Malawi Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programma","bid_reference_no":"MW-MOH-573848-CS-INDV","bid_description":"Consultancy services to develop a written document for integration strategies of tier-specific diagnostic testing for the animal, environment, and human health sector","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"P.O. Box 30377, Capital Hill, Lilongwe. 3","contact_ctry_name":"Malawi","contact_email":"zuzeaaron@gmail.com","contact_name":"Zuze Moses","contact_organization":"Ministry of Health","contact_phone_no":"999 550 776","contact_web_url":"https://www.health.gov.mw","submission_date":"2026-10-07T00:00:00Z","notice_text":"<p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong>GOVERNMENT OF THE REPUBLIC OF MALAWI </strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Ministry of Health and Sanitation</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><p><strong>CONSULTING SERVICES &ndash; INDIVIDUAL SELECTION</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>Country&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; : Malawi</strong></p><p>Name of Project<strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; : Malawi Health Emergency Preparedness, Response and </strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp; <strong>Resilience Program </strong></p><p>Project ID No<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; : </strong><strong>P505187</strong></p><p>Assignment Title&nbsp;&nbsp;&nbsp;&nbsp; <strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Consultancy services to develop a written document for </strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>integration strategies of tier-specific diagnostic testing for </strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>the animal, environment, and human health sector</strong></p><p>Reference No.<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :</strong> <strong>MW-MOH-573848-CS-INDV</strong></p><p>Date of Issue &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>: 7th October, 2026</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Background</strong></li></ol><p>The Government of Malawi through the Ministry of Health is implementing the Malawi Health Emergency Preparedness, Response and Resilience project (MHEPRR). The project is financed by the International Development Association (IDA) and Global Financing Facility (GFF). The five-year project seeks to strengthen the capacity and resilience of Malawi&rsquo;s health system to prevent, prepare for, detect and respond effectively to public health emergencies. It places particular emphasis on strengthening multisectoral coordination, surveillance, laboratory systems and other core capacities required for health emergency preparedness and response.</p><p>Laboratories across human, animal and environmental sectors are essential for surveillance, diagnostics, research and response, but often function in silos, leading to fragmented data sharing, inconsistent protocols and inefficient resource utilization. Harmonizing these laboratories strengthens collaboration, improves early detection systems, and supports evidence-based policies at national, regional and global levels.</p><p>The MHEPRR Project therefore seeks to engage a consultant to undertake a comprehensive assessment of the existing laboratory landscape and develop a strategic framework for strengthening inter-sectoral laboratory collaboration in Malawi.</p><ol><li><strong>Objectives of the consultancy</strong></li></ol><p>Main objective: To develop and provide clear, actionable strategies and a framework for strengthening inter-sectoral laboratory collaboration to achieve more effective, efficient, and sustainable health outcomes in Malawi.</p><p>Specific objectives:</p><ul><li><ul><li>Conduct a comprehensive analysis of the current state of inter-sectoral laboratory collaboration, identifying existing mechanisms, gaps, challenges, and opportunities.</li><li>Engage with key stakeholders to understand their perspectives, roles, and potential contributions to collaborative One Health initiatives.</li><li>Develop a strategic framework that outlines different levels of collaboration in areas of communication, partnership, integration, and potential mechanisms like joint committees, policy agreements, and others.</li><li>Provide concrete, evidence-based recommendations and action plans for implementing a strategic framework that includes specific activities such as</li></ul></li></ul><p>&nbsp;</p><p>achieving SLIPTA 3-star accreditation,&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; strengthening point&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; of entry laboratories, establishing national proficiency testing programs, etc.</p><ol><li><strong>Scope of work</strong><ul><li>Conducting a situational analysis of existing diagnostic and laboratory services.</li><li>Identifying opportunities for test integration, economies of scale, and cost savings.</li><li>Proposing recommendations for policy harmonization and coordination.</li><li>Providing technical advice and supporting stakeholder interaction.</li><li>Developing strategies to integrate tier-specific testing for human, animal, and environmental health.</li></ul></li></ol><p>Specifically, the consultant will perform the following tasks:</p><ul><li><ul><li>Analyze existing policy documents, reports, and strategic plans related to health and development.</li><li>Identify and analyze the roles, interests, and potential influence of key</li></ul></li></ul><p>stakeholders from different sectors: human, environment, veterinary, plant and wild-life health.</p><ol><li><ul><li>Conduct in-depth interviews with senior officials and experts from relevant sectors.</li><li>Facilitate participatory workshops with stakeholders to build consensus and gather insights.</li><li>Develop a detailed report outlining the collaboration framework, strategies, and implementation plan.</li><li>Present the draft findings and recommendations to stakeholders for feedback and validation.</li><li>Deliver a final, comprehensive report incorporating all feedback and detailed action plans.</li></ul></li><li><strong>Deliverables</strong></li></ol><p>The consultant is expected to produce the following:</p><ul><li><ul><li>Inception report: A document detailing the consultant&#39;s understanding of the TOR, proposed methodology, work plan, and timeline.</li><li>Data collection and analysis report: A report summarizing data collection findings and the stakeholder mapping of roles, interests, and influence.</li><li>Draft collaboration strategy: The main report presenting the harmonized strategic framework, recommendations, and action plans.</li></ul></li></ul><p>&nbsp;</p><ol><li><ul><li>Final collaboration strategy: The final validated report, including all annexes such as interview and workshop summaries.</li></ul></li><li><strong>Deliverables and Timelines</strong></li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:#cccccc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:19%\"><p>Deliverables</p></td><td style=\"background-color:#cccccc; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:18%\"><p>Timelines</p></td><td style=\"background-color:#cccccc; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:43%\"><p>Acceptance Criteria</p></td><td style=\"background-color:#cccccc; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:18%\"><p>Responsible</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:19%\"><p>Inception report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:18%\"><p>7 days after signing contract</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:43%\"><p>Report demonstrates a clear understanding of the TOR and objectives; includes a sound methodology and analytical framework; identifies key stakeholders across human, animal, environmental, plant and wildlife health sectors; includes appropriate data collection tools; provides a realistic work plan and timeline</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:18%\"><p>PHIM/PIU</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:19%\"><p>Data Collection and Analysis Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:18%\"><p>30 days after approved inception report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:43%\"><p>Report provides a comprehensive assessment of existing diagnostic and laboratory services and inter-sectoral collaboration mechanisms; identifies gaps, challenges, opportunities and duplication; presents stakeholder mapping covering roles, interests and influence; identifies opportunities for test integration, documents consultation findings; and provides evidence to inform development of the collaboration strategy.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:18%\"><p>PHIM/PIU</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:19%\"><p>Draft Collaboration Strategy</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:18%\"><p>10 days after approved analysis report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:43%\"><p>Strategy provides a clear and practical framework for collaboration across human, animal, environmental, plant and wildlife health sectors; defines roles and responsibilities; proposes appropriate coordination mechanisms; identifies opportunities for integrated testing and shared services; includes evidence-based recommendations and prioritized action plans; and includes timelines and proposed resource requirements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:35px; vertical-align:top; width:18%\"><p>PHIM/PIU</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:19%\"><p>Final Validated Collaboration Strategy</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:18%\"><p>10 days after the approved draft collaboration strategy</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:43%\"><p>Final strategy that will incorporate feedback from stakeholders and from the validation process.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:18%\"><p>&nbsp;PHIM/PIU</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Consultant qualifications and experience</strong></li></ol><p>The consultant should possess the following:</p><ul><li>An advanced degree (Master&#39;s or higher) in Laboratory Sciences, One Health, Public health, Health System Management or other health related fields.</li><li>Minimum of 5 years proven experience in health systems strengthening, strategic planning, and fostering multi-sectoral collaboration, preferably in a developing country context.</li><li>Demonstrated experience in conducting research, stakeholder engagement, and developing actionable strategies.</li><li>Excellent analytical, communication, and report-writing skills.</li><li>A strong understanding of the dynamics and challenges of inter-sectoral laboratory work.</li><li>Demonstrated experience in developing national or regional laboratory networks.</li><li>Proven ability to work with One Health approaches and integrated disease surveillance.</li><li>Experience in areas like disease outbreak investigation, antimicrobial resistance, or specific diagnostics is highly desirable.</li></ul><p>&nbsp;</p><ul><li>Excellent technical knowledge in diagnostics, laboratory systems, biosafety and Biosecurity.</li></ul><ol><li><strong>Duration</strong><strong> of the assignment</strong></li></ol><p>The assignment shall be completed within 120 calendar <strong>days</strong>.</p><p>&nbsp;</p><ol><li><strong>Management and supervision</strong></li></ol><p>The consultant will be hired under the terms of the MHEPRR Project and will be supervised by the Public Health Institute of Malawi, in collaboration with the Project implementing Unit, solely for the purpose of delivering the agreed outputs. The Ministry, as the client, shall provide the necessary support to the consultant to facilitate the execution of the assignment throughout the consultancy period. This support will include:</p><ul><li>Access to relevant project documents necessary for the execution of duties under this consultancy.</li><li>Contact details of relevant stakeholders.</li></ul><p>&nbsp;</p><p>Regular progress updates will be required to ensure alignment with the project objectives and timelines.</p><p>&nbsp;</p><p><strong>9. SELECTION METHOD </strong></p><p>&nbsp;</p><p>The Consultants will be selected in accordance with the <strong>Individual Consultant Selection</strong><strong> </strong></p><p>The attention of interested Consultants is drawn to Section I, paragraphs 1.9 of the World Bank&rsquo;s &ldquo;Procurement Regulations&rdquo; <strong>Selection and Employment of Consultant under IBRD Loans and IDA Credits and Grants by World Bank Borrowers,</strong> <strong>July 2016 Revised November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;- Consultant Guidelines)</strong>, setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>&nbsp;</p><p>Further information can be obtained at the address <strong>9 (a)</strong> below during office hours <strong>from 08.00 to 12.00 and 13.00 to 16.30 hours local time, </strong>except on Weekends and Public Holidays</p><p>&nbsp;</p><ol><li><ol><li><strong>SUBMISSION OF EXPRESSION OF INTEREST</strong></li></ol></li></ol><p>Expression of Interest, clearly marked on the outer envelope with EoI name and reference number must be delivered to the address at 9 (b) below and deposited in the tender box located at Ministry of Heath, 2nd Floor at or before 10:00 hours local time on <strong>28th October</strong>, 2026</p><p>&nbsp;</p><p>9 (a) Address for Clarifications and Further Information</p><p>The Chairperson&nbsp;</p><p>Internal Procurement and Disposal of Assets Committee,</p><p>Ministry of Health</p><p>Procurement Unit &ndash; Malawi Health Emergency Preparedness, Response and Resilience Program (MHEPRRP)</p><p>Ground Floor, Room No. 17</p><p>Capital Hill Circle,</p><p>Lilongwe, Malawi.</p><p>Attention: Procurement Specialist</p><p>Email: andrewngwend@gmail.com<u> </u></p><p>cc: lingonda@gmail.com<u> </u></p><p>&nbsp;</p><p>9 (b) <em>Address for Submission of Expression of Interests</em></p><p>&nbsp;</p><p>The Chairperson&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>Internal Procurement and Disposal of Assets Committee,</p><p>Ministry of Health Headquarters,</p><p>Tender Box:&nbsp; Second Floor,</p><p>Capital Hill Circle,</p><p>Lilongwe,</p><p>Malawi.</p>"},{"id":"OP00473623","notice_type":"Request for Expression of Interest","noticedate":"07-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-26T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Cambodia","project_id":"P509852","project_name":"Nurturing Early Skills through Technology","bid_reference_no":"KH-SVA-NEST PMU-575364-CS-INDV","bid_description":"Individual Consultants for two Site Engineers","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"#8, Street 424, Sangkat Tomnob Teuk, Khan Boeng Keng Kang, Cambodia","contact_ctry_name":"Cambodia","contact_email":"kikuchi@sva.or.jp","contact_name":"Ayano Kikuchi","contact_organization":"Shanti Volunteer Association (NEST PMU)","contact_phone_no":"023219080","submission_date":"2026-10-07T00:00:00Z","notice_text":"<p><strong>TERMS OF REFERENCE</strong></p><p><strong>National Individual Consultant</strong></p><p><strong>Site Engineer (Two Positions)</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:632px\"><tbody><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:202px\"><p><strong>Title</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:429px\"><p>Site Engineer (two (2) positions)</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:19px; vertical-align:top; width:202px\"><p><strong>Contractual Arrangement</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid #156082; border-top:none; height:19px; vertical-align:top; width:429px\"><p>Local Recruitment</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:202px\"><p><strong>Expected Start Date</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:429px\"><p>November 9th 2026</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:37px; vertical-align:top; width:202px\"><p><strong>Contract Duration</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid #156082; border-top:none; height:37px; vertical-align:top; width:429px\"><p>Eight (8) months (November 2026 &ndash; July 2027), with possibility of extension subject to satisfactory performance, project needs, and availability of funding.</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:202px\"><p><strong>Level of Input</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:1px solid #156082; height:18px; vertical-align:top; width:429px\"><p>Full-time</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:202px\"><p><strong>Project</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:429px\"><p>Nurturing Early Skills through Technology (NEST) Project</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:19px; vertical-align:top; width:202px\"><p><strong>Financing Partner</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:1px solid #156082; height:19px; vertical-align:top; width:429px\"><p>The World Bank</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:202px\"><p><strong>Hiring Organization</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:429px\"><p>Shanti Volunteer Association (SVA)</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:37px; vertical-align:top; width:202px\"><p><strong>Duty Station</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:1px solid #156082; height:37px; vertical-align:top; width:429px\"><p>Position 1:</p><p>Battambang Province (covering project sites in Kos Kralar, Ek Phnom and Thmar Kaul Districts)</p><p>Position 2: Banteay Meanchey Province (covering project sites in Phnom Srok District)</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:202px\"><p><strong>Contract Type</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:1px solid #156082; border-top:none; height:18px; vertical-align:top; width:429px\"><p>Time Based</p></td></tr></tbody></table><p>1.&nbsp; Background</p><p>The Nurturing Early Skills through Technology (NEST) Project is funded by the Japan Social Development Fund (JSDF) and administered by the World Bank. The Project is implemented by Shanti Volunteer Association (SVA) in close collaboration with the Ministry of Education, Youth and Sport (MoEYS) of Cambodia.</p><p>The Project aims to enhance access to and quality of Early Childhood Education (ECE) through the promotion of learning through play and the integration of digital technology in target districts in Cambodia. The Project supports teacher professional development, establishment of an ECE digital resource platform, parental and community engagement, improvement of preschool learning environments through construction and renovation, and implementation of pilot school meal programs.</p><p>The Project is implemented in selected districts in Battambang, Banteay Meanchey, and Pailin provinces, targeting public preschools with the objective of strengthening equitable access to quality ECE services for young children aged 3&ndash;5 years.</p><p>Under Component 2 of the Project, SVA will implement phase 1 of civil works activities, comprising: (i) construction of 8 new preschool buildings, toilets, water tanks and 6 kitchen facilities.; (ii) renovation of 17 existing preschool buildings; and (iii) outdoor environment improvements at&nbsp; 25 targeted preschools. These works are spread across three districts in Battambang province and one district in Banteay Meanchey Province., and procured through Request for Bids (RFB) and Request for Quotations (RFQ) methods</p><p>To strengthen day-to-day site supervision during the main construction period, SVA seeks to recruit two (2) National Individual Consultants &ndash; Site Engineers, one (1) based in Battambang Province and one (1) based in Banteay Meanchey Province. The Site Engineers will provide full-time, on-site supervision over the prime contractor(s) at project sites in their assigned provinces, under the technical guidance of the Civil Engineer Consultant and the SVA Engineer.</p><p>2.&nbsp; Objectives</p><p>The objective of this assignment is to ensure that the prime contractor&rsquo;s civil works at project sites are executed in accordance with the approved drawings, technical specifications, Bills of Quantities (BoQ), and contract requirements, through on-site supervision by the Site Engineer.</p><p>Specifically, the Site Engineer will:</p><ul><li>Provide full-time, day-to-day on-site supervision of the prime contractor&rsquo;s works at project sites in the assigned province.</li><li>Ensure quality of materials and workmanship are complied with specification, approved drawing, method statement and schedules.</li><li>Ensure that the prime contractor executed all work in compliance with approved Environmental and Social(E&amp;S) document</li><li>Maintain accurate and complete site records, including site diaries, inspection checklists, measurement records, and photo documentation.</li><li>Provide verified site-level information (progress, quantities, defects) to the Civil Engineer Consultant and SVA Engineer to support progress monitoring, payment certification, and completion.</li></ul><p>3.&nbsp; Scope of Work</p><p>Under the technical guidance of the Civil Engineer Consultant and the SVA Engineer, the Consultant shall undertake the following tasks at project sites in the assigned province:</p><p>a.&nbsp; Site Mobilization and Pre-Construction</p><ul><li>Become familiar with the approved drawings, technical specifications, BoQs, contract documents, and contractors&rsquo; work programs for each assigned site, and report any discrepancies to the Civil Engineer and SVA Engineer.</li><li>Participate in site handover to contractors and in pre-mobilization meetings with contractors, school representatives, and the SVA project team.</li><li>Sites readiness: coordinate with contractor&rsquo;s supervisor and relevant stakeholders at target schools during contractor mobilization.</li><li>Prepare and submit updated sites plan including photos</li><li>Confirm that contractors have mobilized the required personnel, equipment, materials, site signage, and safety arrangements before works begin.</li></ul><p>b.&nbsp; Day-to-Day Site Supervision and Quality Control</p><ul><li>Conduct full-time, day-to-day supervision of civil works at assigned sites, prioritizing site visits according to construction schedules and critical activities.</li><li>Inspect and verify key construction stages before contractors proceed (e.g., reinforcement and formwork inspection prior to concreting), using standard inspection checklists.</li><li>Verify that materials delivered to site comply with approved samples and technical specifications, and reject and record non-compliant materials.</li><li>Witness and record field and material tests (e.g., concrete slump tests, sampling of concrete test cubes, compaction checks), and follow up on test results.</li><li>Issue site instructions to contractors on quality and workmanship issues within delegated authority, and refer matters beyond this authority, including design changes and variations, to the Civil Engineer Consultant and SVA Engineer.</li></ul><p>c.&nbsp; Site Records, Progress Monitoring and Reporting</p><ul><li>Maintain a site diary for each site, recording daily activities, workforce and equipment, weather conditions, materials delivered, inspections, instructions issued, visitors, and issues.</li><li>Maintain photo documentation (before, during, and after works) and inspection records for each site.</li><li>Monitor actual progress against contractors&rsquo; approved work programs, and report delays together with proposed corrective measures.</li><li>Prepare weekly site progress reports and monthly reports, and submit them to the Civil Engineer Consultant and SVA Engineer.</li><li>Participate in regular site meetings and record minutes and agreed actions, as required.</li></ul><p>d.&nbsp; Measurement and Payment Support</p><ul><li>Verify at sites the actual completed works in Activity Schedule submitted by contractors</li><li>Prepare measurement sheets and supporting documentation for contractors&rsquo; payment applications, for review by the Civil Engineer Consultant and SVA Engineer.</li><li>Record and report site conditions or instructions that may give rise to variations or claims, with supporting evidence, for review by the Civil Engineer Consultant and SVA Engineer.</li></ul><p>e.&nbsp; Environmental, Social, and Safety Compliance</p><ul><li>Monitor contractors&rsquo; daily implementation of occupational health and safety (OHS) measures, including use of personal protective equipment (PPE), site fencing and barricading, safety signage, safe working at height, and first aid, with particular attention to the safety of children, teachers, and community members at operating preschools.</li><li>Monitor implementation of E&amp;S mitigation measures at construction sites, including dust and noise control, waste management, drainage, and agreed working hours, in coordination with the E&amp;S Specialist.</li><li>Monitor contractor compliance with labor management requirements, including workers&rsquo; code of conduct and prevention of child labor.</li><li>Report E&amp;S incidents, accidents, and non-compliance to the E&amp;S Specialist and SVA Project Manager immediately, and in any case within 24 hours, and follow up on corrective actions.</li><li>Liaise with school directors, School Management Committees (SMCs), and local authorities on site-level matters, and refer community concerns and grievances to the Project Grievance Redress Mechanism (GRM).</li></ul><p>f.&nbsp; Completion and Handover</p><ul><li>Participate in pre-completion and final inspections, and prepare defect (snagging) lists for each site.</li><li>Monitor rectification of defects by contractors and confirm completion of rectification works.</li><li>Compile site-level completion documentation, including as-built mark-ups, photo records, test records, and site diaries.</li><li>Support the handover of completed facilities to schools, School Management Committees (SMCs), and relevant government counterparts.</li></ul><p>4.&nbsp; Expected Outputs and Deliverables</p><p>The following deliverables are expected over the course of the assignment. Timelines are indicative and subject to adjustment based on project implementation progress and construction schedules.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:632px\"><tbody><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:20px; vertical-align:top; width:33px\"><p><strong>#</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:none; border-top:1px solid #156082; height:20px; vertical-align:top; width:418px\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:20px; vertical-align:top; width:180px\"><p><strong>Timeline</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:33px\"><p>1</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:27px; vertical-align:top; width:418px\"><p>Inception Work Plan and site supervision schedule for assigned sites</p></td><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:180px\"><p>Within two (2) weeks of contract signing</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:33px\"><p>2</p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:none; border-top:1px solid #156082; height:27px; vertical-align:top; width:418px\"><p>Site diaries and inspection checklists for each site</p></td><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:180px\"><p>Daily (submitted with weekly reports)</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:33px\"><p>3</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:27px; vertical-align:top; width:418px\"><p>Weekly site progress report (progress, quality issues, instructions issued, E&amp;S/OHS observations, and photos)</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:180px\"><p>Weekly</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:33px\"><p>4</p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:none; border-top:1px solid #156082; height:27px; vertical-align:top; width:418px\"><p>Monthly report, including progress against work programs and E&amp;S compliance</p></td><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:180px\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:33px\"><p>5</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:27px; vertical-align:top; width:418px\"><p>Material inspection and test records, and measurement sheets supporting contractors&rsquo; payment applications</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:180px\"><p>As required, in line with contractors&rsquo; payment schedules</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:33px\"><p>6</p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:none; border-top:1px solid #156082; height:27px; vertical-align:top; width:418px\"><p>E&amp;S and OHS incident reports</p></td><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:180px\"><p>Within 24 hours of occurrence</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:33px\"><p>7</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:27px; vertical-align:top; width:418px\"><p>Defect lists and pre-completion inspection reports for each site</p></td><td style=\"border-bottom:none; border-left:1px solid #156082; border-right:1px solid #156082; border-top:none; height:27px; vertical-align:top; width:180px\"><p>Prior to practical completion at each site</p></td></tr><tr><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:33px\"><p>8</p></td><td style=\"border-bottom:1px solid #156082; border-left:none; border-right:none; border-top:1px solid #156082; height:27px; vertical-align:top; width:418px\"><p>Site completion documentation package and Final Report</p></td><td style=\"border-bottom:1px solid #156082; border-left:1px solid #156082; border-right:1px solid #156082; border-top:1px solid #156082; height:27px; vertical-align:top; width:180px\"><p>Upon practical completion of each site; Final Report at end of contract</p></td></tr></tbody></table><p>5.&nbsp; Work Supervision</p><p>The Consultant will work under the overall supervision of the SVA Project Manager and will receive day-to-day technical guidance from the Civil Engineer Consultant and the SVA Engineer.</p><p>The Consultant will coordinate and liaise with:</p><ul><li>The Civil Engineer, the SVA Engineer, and the other Site Engineer, to ensure a consistent supervision approach across provinces;</li><li>PMU members and field staff;</li><li>The E&amp;S Specialist and other technical consultants engaged under the Project;</li><li>Contractors, site supervisors, and construction personnel at project sites;</li><li>School directors, School Management Committees (SMCs), community representatives, and sub-national authorities at project sites.</li></ul><p>The Consultant shall submit site records and weekly reports to the Civil Engineer Consultant and SVA Engineer, and monthly reports to the SVA Project Manager through the SVA Engineer, for review and approval. The Consultant shall participate in regular coordination meetings, site meetings, and World Bank supervision missions, as required.</p><p>6.&nbsp; Contract Term and Location of Assignment</p><p>The contract period is eight (8) months, from November 2026 to July 2027, with possibility of extension subject to satisfactory performance, project needs, and availability of funding.</p><p>The Consultant will be engaged as a full-time Individual Consultant (IC) under the NEST Project and is expected to be present at project sites on a daily basis throughout the assignment period.</p><p>Key arrangements are as follows:</p><ul><li>Duty Station: Position 1 &ndash; Battambang Province (covering project sites in Kos Kralar, Ek Phnom and Thmar Kaul Districts) Position 2 &ndash; Banteay Meanchey Province (covering project sites in Phnom Srok District)</li><li>Contract Modality: The contract will be time-based, with remuneration at a fixed monthly rate for the duration of the assignment.</li><li>Working Arrangements: Full-time, in accordance with SVA working hours. Work outside regular working hours may be required in line with construction activities, subject to SVA policy.</li><li>The Consultant is expected to work primarily at project sites and to make their own arrangements for workspace. No office space will be provided by SVA; however, the Consultant may use the SVA Battambang Office for meetings or as required. The Consultant is expected to provide their own computer, smartphone for photo documentation, and personal working equipment.</li><li>Payment Modality: Payment shall be made on a monthly basis upon submission and approval of monthly reports and agreed deliverables.</li><li>Travel costs directly related to project implementation and approved by SVA, including daily travel to project sites, will be covered in accordance with SVA travel policy.</li></ul><p>7.&nbsp; Consultant Qualifications</p><p>Education</p><ul><li>Bachelor&rsquo;s degree in Civil Engineering, Construction Engineering, Architecture, or other relevant technical field. A technical diploma with additional relevant site experience may be considered.</li></ul><p>Experience</p><ul><li>Minimum two (2) years of relevant professional experience in site supervision of building construction and/or renovation works.</li><li>Hands-on experience in site-level quality control, including stage inspections, material checks, and quantity measurement.</li><li>Experience in maintaining site diaries, inspection records, and progress reports.</li><li>Experience in construction of schools or other public or community buildings is an advantage.</li><li>Experience working on World Bank-financed or other internationally funded projects is an advantage.</li></ul><p>Technical Competencies</p><ul><li>Sound practical knowledge of building construction methods, materials, and quality control at site.</li><li>Ability to read and interpret construction drawings, technical specifications, and Bills of Quantities.</li><li>Ability to carry out site measurements and quantity verification.</li><li>Familiarity with occupational health and safety (OHS) requirements and environmental and social compliance in construction settings.</li><li>Ability to keep accurate records and prepare clear and timely reports.</li><li>Proficiency in MS Office (Word and Excel); knowledge of AutoCAD is an advantage.</li><li>Fluency in Khmer is required; working knowledge of English, both written and spoken, is required.</li></ul><p>Other Considerations</p><ul><li>Willingness to reside in or near the assigned province and to travel daily to project sites, including remote rural areas.</li><li>A valid driving license is required.</li><li>The Consultant must not hold a government position during the contract period.</li><li>The Consultant must not have any conflict of interest with contractors engaged under the Project.</li></ul><p>8.&nbsp; Guidelines for Applying</p><p>Interested candidates should submit the following documents to the contact below, with the subject line:</p><p><strong><em>&ldquo;Application for IC &ndash; Site </em></strong><strong><em>Engineer ([Battambang / Banteay Meanchey]) &ndash; NEST Project: [Your Full Name]&rdquo;</em></strong></p><p>Required submission documents:</p><ul><li>Updated Curriculum Vitae (CV) clearly demonstrating qualifications and relevant experience.</li><li>Cover letter outlining suitability for the role, preferred duty station (Battambang or Banteay Meanchey), expected monthly rate, and availability.</li></ul><p>&nbsp;</p><p><strong>Submit to:</strong></p><p><strong>Ms. Chea Sopheavy</strong></p><p>Position: Procurement and Operation Officer, Shanti Volunteer Association (SVA)</p><p>Address: No. 8, Street 424, Sangkat Tomnob Teuk, Khan Boeng Keng Kang, Phnom Penh</p><p>Email: info@sva-cambodia.org</p><p>&nbsp;</p><p><strong>Copy to:</strong></p><p>&nbsp;</p><p><strong>Ms. Ayano Kikuchi</strong></p><p>Position: Project Manager, NEST Project, SVA</p><p>Email: &nbsp;kikuchi@sva.or.jp</p><p><em>Applications will be accepted until <strong>October 26th, 2026 at 17:00PM</strong></em><em>. Only shortlisted candidates will be contacted for further assessment. The Consultant will be selected in accordance with the World Bank&rsquo;s Procurement Regulations for IPF Borrowers (Revised February 2025), under the Individual Consultant (IC) selection method.</em></p>"},{"id":"OP00469086","notice_type":"Request for Expression of Interest","noticedate":"07-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-15T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Pacific 1","project_id":"P502591","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","bid_reference_no":"FJ-PIFS-468930-CS-INDV","bid_description":"Tonga Payment Expert (6 years)","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ratu Sukuna Road, Suva, Fiji.","contact_ctry_name":"Fiji","contact_email":"ajayj@forumsec.org","contact_name":"Ajay Jagannath","contact_organization":"Pacific Island Forum Secretariat","contact_phone_no":"679-3312600","contact_web_url":"www.forumsec.org","submission_date":"2026-10-07T00:00:00Z","notice_text":"<p><strong>Request for Expressions of Interest</strong></p><p><strong>(INDIVIDUAL CONSULTING SERVICES)</strong></p><p><strong>Payments System Advisor to the National Reserve Bank of Tonga (NRBT)</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Project Name</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Pacific Strengthening Correspondent Banking Relationships Project</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Project Number</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>P502591</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Website</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>https://projects.worldbank.org/en/projects-operations/project-detail/P502591</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Activity and Reference Number (STEP)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Payments System Advisor (Tonga) - FJ-PIFS-468930-CS-INDV</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Implementing Agency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Pacific Islands Forum Secretariat (PIFS)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Country</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>FIJI</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>PIFS,</strong>&nbsp;on behalf of the participating member countries, now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (attach curriculum vitae and a cover letter with description of experience in similar assignments, similar conditions, etc.).</p><p>Firms&rsquo; staff may express interest through the employing firm for the assignment and, under such situation, only the experience and qualifications of individuals shall be considered in the selection process.</p><p>The attention of interested Consultants (including firms) is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, dated September 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. A Consultant will be selected in accordance with the individual consultant selection method set out in the World Bank Consultant Guidelines</p><p>The detailed Terms of Reference (TOR) for the assignment is attached below and provides details of the scope of the services required along with specific deliverables expected. Further information can be obtained at the address below during office hours 09.00 to 17.00 hrs Fiji Time.</p><p>Expressions of Interest must be delivered in written form by email no later than:</p><p><strong>Thursday, 15 October 2026 at 17:00 hours (Fiji Time)</strong></p><p>&nbsp;</p><p>Address for Enquiries and Submission of EOIs:</p><p>Pacific Islands Forum Secretariat</p><p>Attn: Ajay Jagannath, Project Coordinator</p><p>Private Mail Bag, Suva</p><p>PO Box 856, Suva, Fiji.</p><p>Tel: 679-3312600</p><p>E-mail: cbrprocurement@forumsec.org&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; TERMS OF REFERENCE</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; CONSULTING SERVICES - INDIVIDUAL SELECTION</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Payments System Advisor to the National Reserve Bank of Tonga (NRBT)</strong></p><p>&nbsp;</p><p><strong>&nbsp;Project Overview</strong></p><table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:168px\"><p>Project Name</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:504px\"><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Indicative Activity / Budget Line</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Component 2: Enabling Environment and Regulatory Harmonization - Payment System Oversight and Regulation - Oversight of National Payment Systems</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>STEP Activity Reference #</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>FJ-PIFS-468930-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Position Title</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Payments System Advisor to the National Reserve Bank of Tonga (NRBT)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Location of role</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Nuku&#39;alofa, Tonga, working directly with NRBT, with agreed remote inputs and coordination with the PIFS PMU in Suva. The planning assumption is 50-60 percent of input days in Tonga.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Primary Counterpart</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>National Reserve Bank of Tonga (NRBT)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Duration of Assignment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Time-based individual consultant contract for up to twelve (12) months, with up to 240 working days of input. Extension may be considered subject to project needs, budget availability, consultant performance, procurement plan arrangements, and applicable World Bank no-objection requirements. Payments will be based on approved timesheets and eligible reimbursable expenses.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Implementing Agency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Pacific Islands Forum Secretariat (PIFS)</p><p>https://forumsec.org/</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Agency Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges, and foster collaboration and cooperation in the pursuit of shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources and the alignment of policies, furthering Forum members shared goals of economic growth, sustainable development, good governance and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions and agree on policies that will benefit the people of the region.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Competitive Selection of an independent individual consultant, subject to procurement plan adjustment, justification, conflict-of-interest review, and World Bank no-objection requirements where applicable.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Contract Type and Level of Effort</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Time-based individual consultant contract, planned for a full-time level of input. Payments based on approved timesheets and eligible reimbursable expenses. In-country presence requirement is specified separately above.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Participating Countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>The Pacific Island Countries participating in the regional project comprise Fiji, Kiribati, the Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu. This assignment provides country-specific support to the Republic of the Marshall Islands under the regional project.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Country Supported</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>Tonga. The assignment provides country-specific support to NRBT under the regional CBR Project.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Overall Project Objective</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>The Project Development Objective is to enable continuous access to correspondent banking services in the participating Pacific Island Countries.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>Project Length</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:504px\"><p>August 2024 to September 30, 2030</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Project Background</strong></p><p>The Pacific Islands Forum Secretariat (PIFS) has received financing from the World Bank Group&#39;s International Development Association (IDA) for the Pacific Strengthening Correspondent Banking Relationships Project. The project supports participating Pacific Island Countries to maintain continuous access to correspondent banking services and address payment, regulatory and financial integrity constraints that contribute to de-risking in the region.</p><p>Component 2, Enabling Environment and Regulatory Harmonization, includes support for payment system oversight and regulation, national payment systems, regional harmonization and payments data. Related regional work includes the Pacific Payment Mechanism (PPM) feasibility study, which examines options for aggregating payment flows and improving economies of scale.</p><p>The National Reserve Bank of Tonga (NRBT) has requested support to recruit a National Payments Expert. NRBT has developed a five-year National Payment Services Strategy and is progressing its Payment Systems and Services Bill. The September 2026 concept note records that the Bill had passed its first reading in Parliament and was expected to return for further parliamentary consideration. The Expert will review the latest legislative position and implementation requirements with NRBT at inception.</p><p>The assignment will support implementation of the existing Strategy and strengthen NRBT&#39;s capacity to oversee and develop Tonga&#39;s payment system. The Expert will work alongside NRBT staff to turn strategic priorities into a sequenced work programme and support implementation, industry coordination and knowledge transfer.</p><p>&nbsp;</p><p><strong>Objective of the Position</strong></p><p>The objective is to provide hands-on technical advisory and implementation support to NRBT in implementing its National Payment Services Strategy and improving the efficiency, resilience and oversight of Tonga&#39;s payment systems.</p><p>The Expert will support priority domestic initiatives and NRBT&#39;s active participation in the PPM feasibility study. The work will help NRBT identify the requirements for possible future participation in the PPM and prioritise preparatory actions, taking account of the study&#39;s findings, NRBT&#39;s mandate, available resources and national priorities.</p><p>&nbsp;</p><p><strong>Scope of Services</strong></p><p>The Expert will provide country-level, time-based support on payment system matters. Activities and expected outputs will be agreed with NRBT, PIFS and the World Bank payments team through a 12-month work plan and updated through periodic work planning discussions.</p><ul><li><strong>i. Inception and work planning</strong></li></ul><ul><li>Review the National Payment Services Strategy, the latest Payment Systems and Services Bill, existing implementation plans, payment infrastructure and projects, staffing arrangements and payments-related technical assistance. Review relevant CBR Project, CBR Roadmap and PPM materials supplied by PIFS and the World Bank.</li><li>Prepare an inception assessment and agreed assignment work plan covering priority activities, expected outputs, milestones, dependencies, counterpart responsibilities and the in-country and remote input schedule. Identify information gaps and specialist support needed, and maintain an action tracker as implementation progresses.</li></ul><ul><li><strong>ii. National Payment Services Strategy implementation</strong></li></ul><ul><li>Support NRBT to translate its five-year Strategy into a prioritised implementation plan. Specify responsibilities, timelines, resource requirements and dependencies, with a defined work programme for the first 12 months and a sequence for longer-term actions.</li><li>Review progress with NRBT and industry counterparts, help resolve implementation issues and prepare decision papers on priorities requiring management direction. Keep domestic actions aligned with the CBR Project and any preparatory actions arising from the PPM feasibility study.</li></ul><ul><li><strong>iii. Payment system oversight and regulation</strong></li></ul><ul><li>Support NRBT to strengthen its payments oversight function and prepare the operational arrangements needed under the evolving Payment Systems and Services framework. Activities may cover licensing or registration processes, reporting, risk-based monitoring, operational resilience, consumer protection and coordination with other NRBT functions.</li><li>Assist NRBT with payment oversight procedures, risk-monitoring tools, internal reporting and escalation arrangements. Advise on responsibilities for payment operations and oversight, and on safeguards to manage conflicts between those functions where relevant.</li><li>Provide payment system technical inputs to draft regulations, rules, circulars and guidance, working with legal counsel and relevant specialists. Legal drafting and formal legal opinions remain the responsibility of appropriately qualified legal counsel. Implementation advice must reflect the legislation and powers in force at the relevant time.</li></ul><ul><li><strong>iv. Payment infrastructure and priority initiatives</strong></li></ul><ul><li>Provide technical and implementation support for initiatives prioritised by NRBT under the Strategy. Confirm the initial initiatives, their stage of development and required support in the work plan; the assignment does not presume a particular infrastructure investment or technology solution.</li><li>Help define and review business requirements, options, project plans and payment-related procurement inputs. Advise on interoperability, payment messaging, participation arrangements, settlement and liquidity risks, security, business continuity and operational readiness, as relevant to each initiative.</li><li>Support implementation oversight, participant coordination, industry testing and readiness reviews. Document issues and recommended actions, and coordinate specialist technical inputs where needed. Vendors and participating institutions remain responsible for system development, configuration and defect correction.</li></ul><ul><li><strong>v. Industry coordination and stakeholder engagement</strong></li></ul><ul><li>Support regular engagement between NRBT, banks, payment service providers, money transfer operators, government agencies and other relevant participants. Strengthen existing consultation arrangements and help establish additional coordination mechanisms where NRBT identifies a need.</li><li>Prepare consultation materials, meeting agendas, minutes and action trackers. Support discussions on implementation responsibilities, public-sector payment needs and cross-institutional issues, with decisions and outstanding actions recorded for follow-up.</li></ul><ul><li><strong>vi. Payments data and monitoring</strong></li></ul><ul><li>Help NRBT strengthen the collection, analysis and use of payments data for oversight and policy. Agree priority indicators covering payment volumes and values, system availability, transaction failures, fraud, complaints, remittance flows and costs, and other measures required by NRBT.</li><li>Support the preparation or review of reporting templates, data definitions, validation checks and monitoring tools. Align country inputs with CBR Project and PPM data requests and, where feasible and agreed, support gender-disaggregated reporting on payment and financial-service usage.</li></ul><ul><li><strong>vii. PPM feasibility study and regional coordination</strong></li></ul><ul><li>Support NRBT&#39;s active participation in the PPM feasibility study by coordinating country data and stakeholder inputs, preparing NRBT for consultations and workshops, and reviewing draft findings and design options from Tonga&#39;s perspective.</li><li>Help NRBT identify the key requirements for possible future participation in the PPM as the proposed arrangement develops. Consider the relevant legal and regulatory, institutional, technical, operational and risk-management requirements, together with governance, resourcing and participant-readiness implications identified through the study.</li><li>Prepare and maintain a PPM participation requirements and prioritised action plan for NRBT. Map gaps, proposed actions, responsible institutions, dependencies and indicative timing, and incorporate agreed preparatory actions into the National Payment Services Strategy implementation plan. Requirements should be updated as the feasibility study develops; participation remains subject to its findings, the eventual arrangements and the relevant approvals.</li><li>Coordinate with the PIFS PMU, PIFS Payment Systems Specialist, World Bank payments team and other technical assistance providers on regional payment standards, cross-border payments, CBR information and harmonization activities. Help NRBT avoid duplication and sequence regional support with domestic work.</li></ul><ol><li><strong>Capacity building and knowledge transfer</strong></li></ol><ul><li>Work directly with designated NRBT counterparts throughout the assignment, providing mentoring and on-the-job training in payment policy, operations, oversight, data analysis and implementation management, according to agreed needs.</li><li>Assess immediate and medium- to long-term training needs and prepare a multi-year capacity-building plan. Identify suitable training, peer-learning and regional exchange opportunities, and prepare practical templates, procedures and training materials that NRBT staff can continue to use.</li><li>Support handover of ongoing activities, tools and working documents, with named counterpart responsibilities and a record of remaining training and implementation needs.</li></ul><p>&nbsp;</p><p><strong>Scope Exclusions</strong></p><p>The assignment is limited to payment systems technical assistance. It does not include drafting primary legislation or formal legal opinions, general central banking advice unrelated to payments, or responsibility for production system development, procurement decisions or regulatory approvals. NRBT retains its statutory and decision-making responsibilities.</p><p>Detailed system design, cybersecurity testing, specialist supervisory manuals or other specialist work will be coordinated with appropriately qualified experts where required. Any material addition to the agreed scope or input ceiling will require written approval through the project arrangements.</p><p><strong>Time-Based Reporting Obligations and Expected Outputs</strong></p><p>This is a time-based individual consultant assignment. Payments will be linked to approved timesheets, agreed input days and eligible reimbursable expenses. The expected outputs are working products for managing implementation, reviewing the quality of advice and documenting knowledge transfer; they are not a fixed-price deliverables schedule.</p><p>Working products will include the inception assessment and assignment work plan; the prioritised National Payment Services Strategy implementation plan; oversight procedures and technical advisory notes; implementation and testing inputs for agreed payment initiatives; consultation materials and action trackers; payments data and monitoring tools; the PPM participation requirements and prioritised action plan; and training materials and the multi-year capacity-building plan.</p><p>Outputs may be revised or reprioritised with the agreement of NRBT, PIFS and the World Bank as implementation progresses. Changes will be recorded in progress notes and the action tracker. The Expert will submit a final completion and handover report covering work undertaken, materials produced, outstanding actions, risks and recommendations for continued implementation.</p><p>&nbsp;</p><p><strong>Reporting Obligations</strong></p><p>The Expert will work for the NRBT&#39;s Assistant Governor Operations and designated payments staff on a day-to-day technical basis and administratively to the Project Coordinator in the PIFS PMU. Technical priorities, work planning and expected outputs will be agreed with NRBT, PIFS and the World Bank payments team. Coordination will also involve the PIFS Payment Systems Specialist and Tonga Country Coordinator as relevant.</p><p>Monthly timesheets and short monthly activity notes will be submitted to the NRBT and the PIFS PMU confirming the principal activities undertaken. The notes will record days worked, in-country and remote inputs, meetings, outputs, implementation issues, decisions required and activities planned for the following month.</p><p>The Expert will update the action tracker at least monthly and submit quarterly progress notes against the agreed work plan. Technical outputs will be shared with NRBT and PIFS, with World Bank review or no-objection obtained where required under the project arrangements.</p><p>&nbsp;</p><p><strong>Institutional Arrangements</strong></p><p>This is a time-based individual consultant assignment contracted by PIFS through the PMU under the Pacific Strengthening CBR Project. PIFS will contract the independent individual consultant through the PMU for the benefit of NRBT. The proposed term is up to 12 months and up to 240 working days, providing for a full-time level of input. This workload does not establish a requirement for continuous residence in Tonga.</p><p>The current planning assumption is that 50-60 percent of input days will be delivered in Tonga, working directly with NRBT in Nuku&#39;alofa, with remote inputs used for document preparation, follow-up and coordination. NRBT must confirm whether this meets its requirements or whether a fully resident expert is required. The agreed arrangement and related budget must be settled before recruitment and stated consistently in the advertisement and contract.</p><p>NRBT will facilitate access to relevant documents, designated staff and industry participants. Office space and meeting facilities may be provided by NRBT for in-country inputs and by PIFS for agreed inputs in Suva, subject to availability. The Expert will maintain secure records and comply with confidentiality requirements.</p><p>Continuation or extension will be subject to performance, project needs, budget availability, procurement plan arrangements and applicable approvals. Performance reviews will assess the quality and timeliness of advisory support, counterpart engagement and knowledge transfer.</p><p>&nbsp;</p><p><strong>Performance Indicators</strong></p><p>Performance assessment will focus on inputs, the quality of working products, implementation support and knowledge transfer within the agreed time-based work plan. The Expert will be assessed on the following:</p><ul><li>Monthly timesheets and activity notes are submitted on time and accurately distinguish in-country and remote inputs, work undertaken, outputs and decisions required.</li><li>An inception assessment and assignment work plan are agreed, and a prioritised National Payment Services Strategy implementation plan is prepared and updated with NRBT.</li><li>An action tracker is maintained with activities, responsible counterparts, deadlines, dependencies, risks and pending decisions.</li><li>Payment oversight and regulatory implementation support is documented through technical notes, procedures, review comments or working materials, with specialist and legal matters referred appropriately.</li><li>Agreed payment initiatives receive documented support on requirements, planning, participant coordination, testing and operational readiness.</li><li>Industry engagement is documented through consultation materials, meeting notes and follow-up actions, and payments data work produces agreed templates or monitoring tools.</li><li>NRBT receives timely support for PPM consultations, country inputs and review of study findings. A PPM participation requirements and prioritised action plan is prepared and kept aligned with the study and NRBT&#39;s implementation priorities.</li><li>Training and mentoring are documented, immediate and longer-term skills needs are assessed, and a multi-year capacity-building plan is prepared.</li><li>Quarterly progress notes and a final completion and handover report are submitted, identifying completed work, outstanding actions, open risks and counterpart responsibilities.</li><li>Advice remains professional, objective and impartial, input days are recorded accurately, and the Expert complies with confidentiality, conflict-of-interest and anti-fraud requirements.</li></ul><p><strong>Confidentiality and Conflict of Interest</strong></p><p>The Expert will comply with NRBT&rsquo;s statutory requirements, including all applicable confidentiality, secrecy, data protection and information-protection obligations, as well as relevant PIFS and World Bank policies and rules on anti-corruption, prevention of fraudulent practices, conflicts of interest and confidentiality. Sensitive information obtained during the assignment will be kept confidential and handled only for the purposes of the assignment. Findings, data, reports and recommendations must not be published or disclosed without prior written consent from NRBT and PIFS, and World Bank clearance where required.</p><p>Draft reports and other documents will be reviewed and cleared through the agreed NRBT, PIFS and World Bank arrangements before final issue. A non-disclosure agreement may be signed and attached to the contract. Documents and data will be stored, transmitted and handled securely in accordance with NRBT&rsquo;s applicable statutory and information-protection requirements and the contractual provisions of the assignment, and transferred to the designated counterparts at handover.</p><p>Actual or potential conflicts of interest must be disclosed before contract signature and throughout the assignment. The Expert must not participate in downstream procurement where this would create a conflict under the applicable World Bank Procurement Regulations or Project Operations Manual.</p><p><strong>Evaluation Requirements</strong></p><p><strong>Mandatory Criteria</strong></p><table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:133px\"><p><strong>Mandatory Criteria</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:426px\"><p><strong>Description</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:113px\"><p><strong>Evaluation</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Education</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>A Master&#39;s degree or equivalent qualification in economics, finance, law, public policy, payment systems, information systems, business administration or a related field.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Pass or Fail</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>At least fifteen (15) years of professional experience with a central bank, banking regulator, monetary authority or similar financial-sector authority, including payment system operations, oversight, regulation or related functions. Candidates must have held a department-head or equivalent senior role and demonstrate relevant advisory or implementation experience.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>Pass or Fail</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Desirable Qualifications</strong></p><p>These criteria are desirable qualifications that will be considered in confirming the suitability of the proposed consultant and documenting the direct selection justification. Candidates who meet the mandatory criteria will be ranked out of 100 points based on the scoring criteria above. The evaluation committee may interview the highest-ranked candidates where clarification is required or where candidates are closely ranked.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:672px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:31px\"><p><strong>#</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:574px\"><p><strong>Evaluated Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:67px\"><p><strong>Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p>Knowledge of the economic and financial environment in the Pacific, small island states or other small and capacity-constrained jurisdictions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p>Experience advising central banks or financial-sector authorities on National Payments Strategy implementation, payment system modernization, operations, oversight, regulation or infrastructure implementation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p>25</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p>Experience with digital financial services, non-bank payment service providers, remittances, cross-border payments, financial inclusion, consumer protection, payments data or public-sector payments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p>Ability to prepare practical implementation plans, technical notes, procedures, reporting templates and training materials, and to provide mentoring and knowledge transfer.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p>Experience coordinating multi-stakeholder assignments involving financial-sector authorities, industry and development partners. Prior experience supporting regional initiatives, payment harmonization or cross-border arrangements is desirable.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p>20</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:605px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:67px\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong>Language:</strong> Excellent command of both spoken and written English is required</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Selection Method</strong></p><ul><li>The consultant will be selected through a competitive selection process for an independent individual consultant, subject to the approved procurement plan and applicable World Bank requirements.</li><li>Selection will follow the Selection of an Individual Consultant, World Bank Procurement Regulations Seventh Edition, September 2025.</li><li>Candidates will be assessed against the mandatory criteria and desirable qualifications set out above, based on CVs, supporting documentation, relevant experience, availability, references, and any interview or written assessment deemed necessary by the evaluation committee.</li><li>Candidates who do not meet the mandatory criteria will not be evaluated further.</li><li>Candidates who meet the mandatory criteria will be ranked based on their demonstrated experience and suitability for the assignment, including payment systems expertise, central bank or monetary authority experience, experience in small or capacity-constrained jurisdictions, ability to provide significant in-country presence in Majuro, and capacity to provide practical advisory and implementation support.</li><li>At least two professional references should be obtained or verified for the preferred candidate before contract signature.</li><li>Contract negotiation with the preferred candidate will confirm the daily fee rate, estimated input schedule, in-country presence plan, reimbursable expenses, confidentiality obligations, reporting arrangements and conflict-of-interest undertakings.</li><li>The final selection will be subject to any required PIFS internal approvals, procurement plan requirements, and World Bank review or no-objection requirements.</li><li>The project values individuality and welcomes candidates from diverse cultural, racial, gender and disability backgrounds.</li></ul><p>&nbsp;</p>"},{"id":"OP00469982","notice_type":"Request for Expression of Interest","noticedate":"07-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-12T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Philippines","project_id":"P509767","project_name":"Technical Assistance for Sustainable Agriculture Transformation in the Philippines Project","bid_reference_no":"TASAT-26-001","bid_description":"Hiring of Consultancy Firm to conduct Data Collection and Verification","procurement_group":"CS","procurement_method_code":"QBS","procurement_method_name":"Quality Based Selection","contact_address":"2nd Floor, New DA Building, Elliptical Road, Diliman, Quezon City 1100","contact_ctry_name":"Philippines","contact_email":"ipms@da.gov.ph","contact_name":"Abbey Charles Gawaran","contact_organization":"Department of Agriculture","contact_phone_no":"8929-8741 to 64","contact_web_url":"http://www.da.gov.ph","submission_date":"2026-10-07T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR CONSULTING SERVICES FOR THE PHILIPPINES SUSTAINABLE AGRICULTURE TRANSFORMATION (PSAT) PROGRAM AND THE TECHNICAL ASSISTANCE FOR SUSTAINABLE AGRICULTURAL TRANSFORMATION (TASAT) IN THE PHILIPPINES PROJECT INDEPENDENT VERIFICATION AGENCY (IVA)</p><p>1. The Government of the Philippines (GoP) has received a Grant from the World Bank toward the cost of <strong>Hiring of Consultancy Firm (Independent Verification Agent) for Data Collection and Verification of Philippines Sustainable Agricultural Transformation (PSAT) Program&rsquo;s Disbursement Linked Results (DLRs)</strong> and it intends to apply part of the proceeds of this Grant to <strong>One Hundred Sixteen Million Pesos (116,000,000.00)</strong> payments under the contract for <strong>DASBAC 2026-09-001</strong>.</p><p>2. The Department of Agriculture Philippines Sustainable Agriculture Transformation and Technical Assistance for Sustainable Agriculture Transformation Project Management Office (DA PSAT &amp; TASAT PMO) now calls for the submission of short-listing documents for the Hiring of Consultancy Firm (Independent Verification Agent) for Data Collection and Verification of Philippines Sustainable Agricultural Transformation (PSAT) Program&rsquo;s Disbursement Linked Results (DLRs) using the<strong> Quality Based Selection (QBS) Selection</strong>. Short-listing documents of interested consultants must be duly received by the Bids and Awards Committee (BAC) Secretariat <strong>on or before</strong> <strong>2:00 pm October 9, 2026</strong> at <strong>DA PSAT &amp; TASAT Project Management office</strong>. Applications for eligibility will be evaluated based on a non-discretionary &ldquo;pass/fail&rdquo; criterion.</p><p>3. Interested Bidders may obtain further information from <strong>2nd Floor, DA New Building PSAT and TASAT PMO Procurement Unit, Office of the Interim Procurement Management Office, Department of Agriculture, Elliptical Road, Diliman, Quezon City</strong> and inspect the Bidding Documents at the address given below from <strong>9:00 AM to 4:00 PM.</strong></p><p>4. A complete set of Bidding Documents may be acquired by interested Bidders on October 15, 2026 from the given address below upon payment of the applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB, in the amount of <strong>Fifty Thousand Pesos (50,000.00).</strong></p><p>It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that Bidders shall pay the applicable fee for the Bidding Documents not later than the submission of their bids.</p><p>5. The BAC shall draw up the short-list of consultants from those who have submitted Expression of Interest, including the short-listing documents, and have been determined as eligible in accordance with the Harmonized World Bank&rsquo;s Procurement Guidelines and provisions of Republic Act (RA) No. 12009, otherwise known as the &ldquo;New Government Procurement Act,&rdquo; and its Implementing Rules and Regulations (IRR). The short-list shall consist of five (5), which should not be fewer than three (3) but not more than seven (7) prospective bidders; in case of one (1) or less than the required number apply for eligibility and short-listing, and/or the minimum score required in the short-listing, the BAC shall consider the same who will be entitled to submit bids manually. <strong>The criteria and rating system for short-listing is attached as Annex 1.</strong></p><p>Bidding of this will be conducted through <strong>Quality Based Selection (QBS) </strong>as specified in the Harmonized World Bank Procurement Guidelines and Project Operations Manual.</p><p>In addition, DA PSAT and TASAT PMO bidding is open to all interested bidders, whether local or foreign, subject to the conditions for eligibility provided in the IRR.</p><p>6. Bidding will be conducted in accordance with relevant procedures for competitive selection as specified in the IRR with some amendments, as stated in these bidding documents and is open to all bidders from eligible source countries as defined in the applicable guidelines of the <strong>Harmonized World Bank&rsquo;s Procurement Guidelines and provisions of Republic Act (RA) No. 12009, otherwise known as the &ldquo;New Government Procurement Act,&rdquo; and its Implementing Rules and Regulations (IRR) as applicable.</strong></p><p>7. The Procuring Entity shall evaluate bids to determine the Highest Rated Bid using the Quality Based Selection. The criteria and rating system for the evaluation of bids shall be provided in the Instructions to Bidders.</p><p>8. Short-Listing Documents must be received by the Procuring Entity&rsquo;s BAC at the address indicated in the Request for Expression of Interest on or before the date and time indicated in the SDS.</p><p>9. The contract shall be completed within <strong>five (5) years.</strong></p><p>10. All Bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in <strong>ITB</strong> Clause 16.</p><p>11. The certification as to the current workload relative to capacity shall be made in accordance with the Instructions to Bidders in relation to TPF 5 therein.</p><p>12. Only Shortlisted Bidders are allowed to purchase the Bidding Documents.</p><p>13. The Department of Agriculture Philippines Sustainable Agriculture Transformation and Technical Assistance for Sustainable Agriculture Transformation Project Management Office (DA PSAT &amp; TASAT PMO) reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 70 of RA No. 12009 and its IRR, without thereby incurring any liability to the affected bidder or bidders.</p><p>14. For further information, please refer to:</p><p>DA - PSAT and TASAT PMO<br />2nd Floor, New Building, Department of Agriculture<br />Central Office, Elliptical Road, Diliman, Quezon City</p><p>Email address: psat.tasat@da.gov.ph<br />Telephone number: 8928-8741 to 64 local 2848, 2847, 2137</p><p><strong>TELMA C. TOLENTINO</strong><br />Assistant Secretary for Finance<br />DA - PSAT and TASAT PMO SBAC Chairperson</p><p>17 September 2026</p><p><br /><strong>ANNEX 1<br />SHORTLISTING CRITERIA</strong></p><p>The prospective Independent Verification Agency must comply with the following Shortlisting Criteria before being required to submit a Technical Proposal for Evaluation:</p><p>&nbsp;</p><table border=\"1\" cellpadding=\"1\" cellspacing=\"1\" style=\"width:500px\"><tbody><tr><td><strong>Criteria</strong></td><td><strong>Qualification</strong></td><td><strong>Documentary Requirement</strong></td><td><strong>Pass/Fail&nbsp; &nbsp; &nbsp; &nbsp;</strong></td></tr><tr><td>GENERAL EXPERIENCE</td><td>IVA must have at least eight (8) years of experience in providing similar consulting services in government and/or private project evaluation, rural and agricultural statistics or planning, policy and theoretical research, government agency surveys, social assessments, or related fields.</td><td><p>1. DTI/CDA/SEC Registration and Articles of Incorporation<br />2. BIR Certificate of Registration<br />3. Latest Business Permit</p><p>These must show the company&rsquo;s business/purpose and year of establishment.</p></td><td>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</td></tr><tr><td><br />SIMILAR COMPLETED CONTRACTS</td><td><p>1. The IVA must have completed similar consulting services with project cost in the amount of twenty five percent (25%) of the Estimated Project Cost within the past ten (10) years.</p><p>2. The IVA must have completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB).</p></td><td><p>4. Notice of Award<br />5. Contract of Service in Similar Projects<br />6. Certificate of Completion and/or Acceptance of Work</p><p>These must show the company&rsquo;s Similar Completed Contracts, its nature, commercial value and year of completion.</p><p>These projects must also show the firm&rsquo;s capacity to collect and verify gender-disaggregated data, with experience in applying gender-sensitive verification approaches.</p></td><td>&nbsp;</td></tr><tr><td>INFORMATION INFRASTRUCTURE AND DATA MANAGEMENT CAPABILITIES</td><td>The IVA must have access to data management software and IT infrastructure with demonstrated ability to carry out data processing and analysis.</td><td>7. Technical profile of the firm&rsquo;s data processing facilities, secure server infrastructure, and back-end database management system capabilities<br />8. List with proof of licenses for data collection and statistical software used</td><td>&nbsp;</td></tr><tr><td>ORGANIZATION STRUCTURE AND CAPABILITIES</td><td>All key personnel must meet the above mandated qualifications and participated in or independently completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB).</td><td>9. Organization Structure<br />10. Curriculum Vitae of each Key Personnel<br />11. Proof of employment (employment contracts/labor agreements) or signed Statements/Letters of Commitment from core key experts expressing willingness to undertake the assignment.</td><td>&nbsp;</td></tr><tr><td>NO CONFLICT OF INTEREST</td><td>The IVA must be a third party with no conflict of interest with any project implementation unit at any level &ndash; the firm shall have no financial or institutional interests that could conflict with its verification mandate.</td><td>12. Sworn declaration that &ldquo;the firm is an independent third party with no financial, institutional, or operational conflict of interest with any PSAT Project Implementation Unit at any level.&rdquo;</td><td>&nbsp;</td></tr></tbody></table><p>These requirements will be submitted with the Expression of Interest (EOI).</p><p>&nbsp;</p><p><br /><br />&nbsp;</p><p><strong>SPECIAL BIDS AND AWARDS COMMITTEE</strong></p><p>Special Order No. 734 series of 2026</p><p><strong>&nbsp;</strong></p><p><strong>Bid Bulletin No. 1</strong></p><p><strong>&nbsp;</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:591px\"><tbody><tr><td style=\"vertical-align:top; width:109px\"><p><strong>SUBJECT</strong></p></td><td style=\"vertical-align:top; width:46px\"><p><strong>:</strong></p></td><td style=\"vertical-align:top; width:436px\"><p><strong>REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR CONSULTING SERVICES FOR THE PHILIPPINES SUSTAINABLE AGRICULTURE TRANSFORMATION (PSAT) PROGRAM AND THE TECHNICAL ASSISTANCE FOR SUSTAINABLE AGRICULTURAL TRANSFORMATION (TASAT) IN THE PHILIPPINES PROJECT INDEPENDENT VERIFICATION AGENCY (IVA)</strong></p></td></tr><tr><td style=\"vertical-align:top; width:109px\"><p><strong>DATE</strong></p></td><td style=\"vertical-align:top; width:46px\"><p><strong>:</strong></p></td><td style=\"vertical-align:top; width:436px\"><p><strong>SEPTEMBER 28, 2026</strong></p></td></tr></tbody></table><p><strong>&nbsp;</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>This Bid Bulletin is hereby issued to clarify, modify, or amend items in the Bid Documents and Terms of Reference, and shall thus form an integral part thereof.</p><p>&nbsp;</p><p>For the information and guidance of all concerned.</p><p><br />&nbsp;</p><p>(Original Signed)</p><p><strong>TELMA C. TOLENTINO</strong></p><p>Assistant Secretary for Finance</p><p>PSAT &amp; TASAT SBAC Chairperson</p><p><br /><br /><br /><br /><br /><br /><br /><br /><br />&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:1025px\"><thead><tr><th scope=\"col\" style=\"vertical-align:top\">&nbsp;</th><th scope=\"col\" style=\"vertical-align:top\"><p><strong>REFERENCE/TOPIC</strong></p></th><th scope=\"col\" style=\"vertical-align:top\"><p><strong>CURRENT PROVISION</strong></p></th><th scope=\"col\" style=\"vertical-align:top\"><p><strong>PROSPECTIVE BIDDER&rsquo;S CLARIFICATION</strong></p></th><th scope=\"col\" style=\"vertical-align:top\"><p><strong>DA&rsquo;S RESPONSE</strong></p></th></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>1</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Request of Expression of Interest, Par. 2</p>&nbsp;<p>Mode of Submission of Expression of Interest</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>x x x Short-listing documents of interested consultants must be duly received by the<strong> Bids and Awards Committee (BAC) Secretariat</strong> x x x (emphasis supplied)</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>Kindly confirm whether the EOI/application documents may be submitted electronically via email or through an online portal, or whether physical submission of the documents is mandatory.</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>In order to ensure the timely recording of submissions, only physical submissions of the EOI and attachments to the BAC Secretariat will be acceptable.</p>&nbsp;<p>The BAC Secretariat will receive these documents at:</p>&nbsp;<p>2nd Floor, DA New Building PSAT and TASAT PMO Procurement Unit, Office of the Interim Procurement Management Office, Department of Agriculture, Elliptical Road, Diliman, Quezon City</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>2</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Request of Expression of Interest, Par. 3, 4 and 12</p>&nbsp;<p>Availability of Bidding Documents and Payment of PHP 50,000:&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>Interested bidders may obtain further information from <strong>2nd Floor, DA New Building PSAT and TASAT PMO Procurement Unit, Office of the Interim Procurement Management Office, Department of Agriculture, Elliptical Road, Diliman, Quezon City</strong> and inspect the Bidding Documents at the address given below from 9:00 AM to 4:00 PM.</p><p>&nbsp;</p><p>A complete set of Bidding Documents may be acquired by interested Bidders on <strong>September 30, 2026</strong> from the given address below upon payment of the applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB, in the amount of <strong>Fifty&nbsp; Thousand Pesos (50,000.00).</strong></p><p>Only Shortlisted Bidders are allowed to purchase the Bidding Documents.&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>The notice states that a complete set of Bidding Documents may be acquired upon payment of PHP 50,000, while the documents may also be downloaded free of charge from PhilGEPS and the Procuring Entity&#39;s website. However, we have been unable to locate the relevant documents on the indicated portals.</p>&nbsp;<p>We would therefore appreciate your guidance on where and how the complete bidding documents can be downloaded. Additionally, kindly confirm at which stage of the procurement process the PHP 50,000 fee is required to be paid.</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>As of date, prospective bidders are only required to submit their Expression of Interest with the required documents enumerated in Annex 1 of the REOI.</p><p>The Bidding documents, the technical and financial forms, and fees will be paid only after shortlisting, and applicable only to shortlisted bidders issued with Request for Proposals.</p><p>The documents and forms will be available after shortlisting.&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>3</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Terms of Reference</p>&nbsp;<p>Eligibility of International Firms / Joint Venture</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>N/A</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>Kindly confirm whether an international consulting firm based in India is eligible to participate in this procurement process, either independently or in Joint Venture (JV) with a locally registered Philippine company.</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>International companies are allowed to participate, either as joint venture partner and individual bidder. So long as they meet the required shortlisting and evaluation criteria</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>4</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Terms of Reference and Request for Expression of Interest Annex 1</p>&nbsp;<p>Terms of Reference and Project Documents</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>N/A</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>We would be grateful if you could kindly share the Terms of Reference (TOR), Request for Expression of Interest/Bidding Documents, and any other relevant procurement documents for our review and preparation.&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>The Terms of Reference and REOI Annex 1 were posted with the REOI for Bidder&rsquo;s Reference, nevertheless they are again herein attached for prospective bidders.&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>5</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Postponement of Procurement Timelines</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>N/A&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>N/A</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>The deadline for submission of Expressions of Interest and attachments enumerated in Annex A is postponed from:</p>&nbsp;<p>2:00 PM, September 28, 2026 at 2nd Floor, DA New Building PSAT and TASAT PMO Procurement Unit, Office of the Interim Procurement Management Office, Department of Agriculture, Elliptical Road, Diliman, Quezon City</p>&nbsp;<p>To:</p>&nbsp;<p><strong>2:00 PM, October 12, 2026</strong>, at the same address above.</p>&nbsp;<p>Shortlisting and Request for Proposals will be accomplished and issued by <strong>October 19, 2026</strong>. The Public Bidding documents will be available on <strong>October 20, 2026</strong> at the <strong>2nd Floor, DA New Building PSAT and TASAT PMO Procurement Unit, Office of the Interim Procurement Management Office, Department of Agriculture, Elliptical Road, Diliman, Quezon City.</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:38px\"><p>6</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:188px\"><p>Request of Expression of Interest, Par. 1</p>&nbsp;<p>Project Contract Number</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:269px\"><p>The Government of the Philippines (GoP) has received a Grant from the World Bank toward the cost of <strong>Hiring of Consultancy Firm (Independent Verification Agent) for Data Collection and Verification of Philippines Sustainable Agricultural Transformation (PSAT) Program&rsquo;s Disbursement Linked Results (DLRs) </strong>and it intends to apply part of the proceeds of this Grant to <strong>One Hundred Sixteen Million Pesos ( 116,000,000.00) </strong>payments under the contract for <strong>DASBAC 2026-09-001.</strong></p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:211px\"><p>N/A</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:319px\"><p>The Project Contract No. is amended to <strong>DASBAC 2026-09-001.</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>TERMS OF REFERENCE (TOR)</strong></p><p>&nbsp;</p><p>for Services of&nbsp; Independent Verification Agent (IVA) for Verification of Achievement of the Disbursement Linked Results (DLRs) under the Philippines Sustainable Agricultural Transformation (PSAT) Program</p><p>&nbsp;</p><ol><li><p>Background</p></li></ol><p>&nbsp;</p><ol><li><p>Project Origin</p></li></ol><p>&nbsp;</p><p>The Department of Agriculture (DA) is the government agency responsible for the promotion of agricultural development by providing the policy framework, public investments, and support services needed for domestic and export-oriented business enterprises. With support from the World Bank, the DA is implementing the Philippines Sustainable Agricultural Transformation (PSAT) Program. PSAT is a five-year program (July 2026 to December 2030) that aims to improve productivity, diversification, climate resilience, and public resource use efficiency in the agrifood systems in the Philippines.</p><p>&nbsp;</p><p>The DA will implement the PSAT program that will support achievement of the agriculture and fisheries sectors&rsquo; development objectives by providing budgetary assistance for five (5) years to existing and new department programs. It will incentivize DA performance by linking funding support to the accomplishment of the set of Disbursement Linked Indicators (DLIs) and its corresponding Disbursement Linked Results (DLRs). The promised additional funding will compel and enable the agency to accelerate its programs to meet established targets and deliver on its commitments.&nbsp;</p><p>&nbsp;</p><p>The PSAT program is funded by the World Bank through a Program-for-Results Financing (PforR) Loan in the amount of One Billion US Dollars (1,000,000,000.00 USD). The PforR instrument is linked to the achievement of targets for a set of ten (10) DLIs and associated DLRs. There are a total of twenty (20) DLRs spread over five years. The disbursement will be contingent upon the&nbsp;</p><p>DA endorsing to DOF an acceptable Results Verification Report (RVR) and the DOF subsequently furnishing the RVR to the World Bank as satisfactory evidence that the relevant Disbursement-Linked Results (DLRs) have been achieved and independently verified by the Independent Verification Agency (IVA). Therefore, verification of these results is an integral part of the Program given the nature of the instrument.</p><p>&nbsp;</p><p>The purpose of this Terms of Reference (ToR) is to appoint an administratively, technically, and financially autonomous Independent Verification Agency (IVA) to undertake verification of the achievements of the DLRs. The appointed agency will verify the achievement of the DLRs as per the methods outlined in the ToR and submit the verification reports to the Project Management Office (PMO) and the World Bank.</p><p>&nbsp;</p><p>The PSAT Loan Agreement signed with the World Bank on April 2026, and Project Appraisal Document (PAD) establishes a monitorable and verifiable Disbursement-Linked Indicator System, where the completion status of the pre-identified DLIs through verified DLRs is directly linked to loan disbursement.&nbsp;</p><p>&nbsp;</p><p>Therefore, the Project Management Office (PMO) intends to procure an Independent Verification Agency (IVA) to facilitate this aforementioned Disbursement-Linked Indicator System</p><p>&nbsp;</p><ol><li>Program Result Areas</li></ol><p>&nbsp;</p><p>The PSAT activities are organized around three result areas that contribute to the achievement of the Program Development Objective of improving productivity, diversification, climate resilience and public resource use efficiency in the agrifood systems in the Philippines:</p><p>&nbsp;</p><ul><li>Result Area 1: Enhanced production and incomes in rice-based farming, supports climate-resilient and diverse rice-based farming by (a) improving the rice seed program by ensuring distribution of approved and registered rice varieties suited to local agro-climatic conditions; (b) increasing diversification of rice-based farming by integrating the government&rsquo;s rice program with other commodity programs; (c) promoting mechanical direct seeding to lower labor costs, optimize seed use, and reduce GHG emissions; (d) implementing the use of IMC to improve the efficiency of fertilizer support; (e) fostering climate-smart agriculture through training and adoption of resilient technologies; and (f) increasing the intensity of available mechanization for rice-based farming;&nbsp;</li></ul><p>&nbsp;</p><ul><li>Result Area 2: Enhanced efficiency and resilience of food value chains, supporting climate-resilient, high-value crop production and enhancing post-harvest infrastructure to minimize food losses and improve marketable output through, among others: (a) increasing vegetable production using modern technologies such as tissue culture, climate-resilient screen-houses, and rain shelters; (b) expanding cold storage and promoting green technology adoption, including modular storage designs for broader private sector uptake; and (c) facilitating agricultural exports by upgrading food safety and plant quarantine laboratories and providing certification for agricultural exports; and</li></ul><p>&nbsp;</p><ul><li>Result Area 3: Enhanced institutional delivery and performance, strengthening institutional frameworks and systems to support a competitive agri-food economy by, among others: (a) improving budgetary processes to enhance programmatic and results-based public expenditure; (b) establishing and operationalizing a data Command Center for integrating, storing, and analyzing datasets across DA agencies, enabling data-driven decision-making and climate disaster response; and (c) optimizing DA procurement systems to improve efficiency, shorten bid evaluation and award timelines, and promote environmentally sustainable &ldquo;green procurement&rdquo; practices.</li></ul><p><br />&nbsp;</p><ol><li>Objective of the Assignment&nbsp;</li></ol><p>&nbsp;</p><p>The objectives of this consultancy assignment are to:</p><p>&nbsp;</p><ol><li>Conduct an independent verification of the achievement of DLRs&nbsp; under the PSAT Program, based on the Verification Protocol agreed between the Government of the Philippines and the World Bank; and&nbsp;</li></ol><p>&nbsp;</p><ol><li>Prepare and submit to DA comprehensive Results Verification Reports (RVRs), in form and substance acceptable to the DA and the World Bank, documenting the achievement of the DLRs and providing the evidence required to support withdrawal applications. Upon acceptance by the DA, the RVRs shall be endorsed by the DA to the Department of Finance (DOF) for submission to the World Bank as part of the requirements for loan disbursement.&nbsp;</li></ol><p>&nbsp;</p><p>These reports will be reviewed by the DA. Subsequently, the DA will submit to the DOF an acceptable RVR for the World Bank&rsquo;s review as part of the requirements for processing PSAT Loan disbursements.</p><p>&nbsp;</p><ol><li><p>Scope of Work</p></li></ol><p>&nbsp;</p><p>The Procurement of the Independent Verification Agent will follow the World Bank Procurement Guidelines harmonized with the Philippines&rsquo; domestic consulting service procurement guidelines and approach through a Quality Based Selection (QBS).&nbsp;</p><p>&nbsp;</p><p>The World Bank&#39;s Project Appraisal Document (PAD) and Loan Agreement (LA) for PSAT outlines the following DLIs and DLRs with its relevant Loan Disbursement schedule (<u>See Annex A</u>).</p><p>&nbsp;</p><p>The independent verification agency must use the PAD and LA as the primary references to ensure the method of verification of the DLIs and DLRs as well as ensuring that the conduct of monitoring and evaluation (M&amp;E) of the project are in line with the Project Design and the Verification Protocols.&nbsp;</p><p>&nbsp;</p><p>The verification agency shall verify the accomplishment of the above-mentioned DLR Items. Verification will take place against a verification framework and frequency, described in detail in the Verification Protocol (See <u>Annex B</u>).</p><p>&nbsp;</p><p>The detailed scope of work of the Independent Verification Agency (IVA) will cover the following:</p><p>&nbsp;</p><ol><li>Submission of an Inception Report for the PSAT and TASAT PMO&rsquo;s review and approval. This report shall include a DLI and DLR verification plan, which shall be approved by the PSAT and TASAT PMO and shall accomplish the following:&nbsp;</li></ol><p>&nbsp;</p><ol><li>Establish the evaluation framework and detailed methodology for assessing the baselines and results against DLRs, which includes the sampling design, data collection instruments, primary and secondary information sources, and verification methods;</li></ol><p>&nbsp;</p><ol><li>Prepare DLI/DLR Verification Procedures and On-site Verification Plans, field operations and processing manuals, interview or survey plan,&nbsp; questionnaires and other analogous methods or instruments for Verification; and</li></ol><p>&nbsp;</p><ol><li>Conduct a workshop on the proposed Verification Procedures, On-site Verification Plans and related documents of the Verification Agent which must be in line with that provided by the World Bank. Such protocols must consider all inputs from all relevant offices for each DLI/DLR.</li></ol><p>&nbsp;</p><ol><li>Carry out the Independent Verification of DLIs and DLRs, which involves but is not limited to the following tasks:&nbsp;</li></ol><p>&nbsp;</p><ol><li>Implement the approved Disbursement-Linked Indicator Verification Plan and conduct verification in a timely manner. Any additions or changes to the verification plan will require prior approval in writing by the DA and the World Bank;</li></ol><p>&nbsp;</p><ol><li>Generate and provide&nbsp; empirical, statistically robust and qualitative/ anecdotal evidence to the DA as Verified Accomplishment of the pre-identified DLIs and DLRs for PSAT;</li></ol><p>&nbsp;</p><ol><li>Pre-test data collection instruments especially those requiring large-scale data collection conducted over multiple time periods;&nbsp;&nbsp;</li></ol><p>&nbsp;</p><ol><li>Implement the Verification Procedures and On-site Verification Plans. This includes conducting field data collection visits to farms, farming households, offices of relevant government institutions and the private sector as well as any stakeholder deemed appropriate and necessary. The visits will be conducted in coordination with the PSAT-TASAT PMO to complement desk reviews and will include spot checks and interviews with government officials, beneficiaries and end-users;</li></ol><p>&nbsp;</p><ol><li>Hire the needed dedicated personnel, consultants, Contract of Service (COS) Workers, Statistical Researchers, and Processors to be available during the entire period of the verification process and analysis/ reporting;</li></ol><p>&nbsp;</p><ol><li>Coordinate closely with the PSAT-TASAT PMO and conduct regular consultation meetings based on agreed outputs and timetable of activities, or as needed. The timetable of activities as provided in a latter section of this TOR;</li></ol><p>&nbsp;</p><ol><li>Strictly follow the timetable of activities in the delivery of outputs and revisions thereto;</li></ol><p>&nbsp;</p><ol><li>Comply with any changes provided by the DA in relation to the timeline of activities;</li></ol><p>&nbsp;</p><ol><li>Report to the DA the occurrence of any event or condition that might delay or prevent the completion of the survey or the services following the schedule, indicating the steps that are being undertaken to rectify the situation; and</li></ol><p>&nbsp;</p><ol><li>Comply with any comments of the DA in relation to the outputs provided in this Section of the TOR.</li></ol><p><br />&nbsp;</p><ol><li>Data Management and Analysis Systems. The IVA shall design and set up the back-end data processing systems (simple and robust) to host field data. A secure database system storing primary data collected for analysis and reporting will be shared with the PSAT PMO. This system must be in line and in compatible with the PMO&rsquo;s Monitoring and Evaluation (M&amp;E) framework and system</li></ol><p>&nbsp;</p><ol><li>Process Documentation. Prepare detailed documentation of all evaluation processes to ensure transparency and accountability to be shared with the DA and other stakeholders.</li></ol><p>&nbsp;</p><ol><li>Submit Verification Reports documenting the DA&rsquo;s implementation of program interventions resulting in the achievement of DLIs and DLRs. The report must be written in English and should include: summaries of verification activities undertaken to check the accuracy of results data, supporting documents, verified baselines and results of all DLIs and DLRs, recommended disbursement levels for each DLI, summaries of major discrepancies accompanied by short explanations, and recommendations and analysis of progress for each DLI.&nbsp;</li></ol><p>&nbsp;</p><p>These reports must include the work conducted, data sources and analysis, verification process and methods, assessment criteria, indicator achievement status, and conclusions.&nbsp;&nbsp;</p><p>&nbsp;</p><ol><li>Develop standardized verification mission templates for each DLR to be applied in every semi-annual verification cycle, detailing (i) the DLR description and measurement criteria (qualitative and/or quantitative), (ii) applicable verification targets for the relevant period, and (iii) the scope of activities covering pre-verification, verification, and post-verification stages; and</li></ol><p>&nbsp;</p><ol><li>Assist the DA, PSAT-TASAT PMO and project stakeholders in understanding project progress and implementation effectiveness, identifying issues arising during execution, and providing a basis for adjustments to DLIs and DLRs.</li></ol><p><br /><br /><br />&nbsp;</p><ol><li><p>Functions of the PSAT-TASAT PMO and IVA</p></li></ol><p>&nbsp;</p><p>Responsibilities of the PSAT PMO.&nbsp;</p><p>&nbsp;</p><p>The PMO is responsible for:&nbsp;</p><p>&nbsp;</p><ol><li>coordinating the work of all designated staff from PMO for monitoring DLI / DLR progress and for all data collection activities and support the work of the IVA related to validating DLIs and DLRs that are declared as achieved by the participating institutions;</li></ol><p>&nbsp;</p><ol><li>providing pre-verification information, documents and updates appropriate for the assignment to the IVA;&nbsp;</li></ol><p>&nbsp;</p><ol><li>coordinating the work of the IVA and ensuring its engagement with the DA&rsquo;s PSAT implementing offices, direct project beneficiaries and other key stakeholders;&nbsp;</li></ol><p>&nbsp;</p><ol><li>Review IVA reports and provide comments where needed and formally endorse and submit final verification reports and evidence to the World Bank through the DOF for disbursement purposes</li></ol><p>&nbsp;</p><p>Responsibilities of the IVA.</p><p>&nbsp;</p><p>The IVA is responsible for</p><p>&nbsp;</p><ol><li>Maintaining regular communication with the PSAT-TASAT PMO via direct meeting, audio-conference, videoconference, and email regarding all aspects of the assignment;&nbsp;</li></ol><p>&nbsp;</p><ol><li>Providing the PSAT-TASAT PMO and the World Bank with copies of the evaluation framework, workflow, timelines and data collection methodology for review at inception;&nbsp;</li></ol><p>&nbsp;</p><ol><li>Submitting in a timely manner the Verification Reports to PSAT-TASAT PMO and the World Bank; and</li></ol><p>&nbsp;</p><ol><li>Strictly complying with all general independence, confidentiality, and professional integrity codes.&nbsp;</li></ol><p>&nbsp;</p><p>The IVA shall seek advice from the PMO when uncertain about the responsibilities and requirements.</p><p>&nbsp;</p><ol><li><p>Deliverables, timeline, and payment schedules</p></li></ol><p>&nbsp;</p><p>A locally registered and specialized firm with relevant experience, resources and personnel will be procured for the estimated cost of One Hundred Sixteen Million Pesos (116,000,000.00) as the verification agency for DLIs and DLRs during the entire project implementation period CY 2026-2030.&nbsp;</p><p>&nbsp;</p><p>The total budget allocated covers all expenses, including applicable taxes, consultant fees, enumerator costs, site visits, and logistical requirements. For transparency and simplicity, all costs, such as personnel, materials, travel, and other project-related expenses, have been consolidated into a lump sum price, adhering to the terms outlined in the contract.</p><p>&nbsp;</p><p>Payments will be based on the submission of specific outputs, duly accepted and found satisfactory by the DA, in accordance with the terms outlined in the contract, TOR, Inception Report, and any other pertinent agreements documented during meetings. The Consulting Firm or IVA is mandated to provide the DA with both hard and soft (via email) copies of the reports, including data files, at least one week before the designated deadline for approval acceptance. Each deliverable will undergo a rigorous review, assessing alignment with the agreed-upon content to ensure quality of each report.&nbsp;</p><p>&nbsp;</p><p>It is crucial to note that the DA shall possess and retain the intellectual property rights of all the reports and data files generated by the activities, and all data is confidential, not to be released to third parties without written approval.</p><p>&nbsp;</p><p>In the event of failure to deliver any or all of the Services within the specified period, the Procuring Entity reserves the right to deduct liquidated damages from the contract price, equivalent to the price of the unperformed portion of the Services for each day of delay based on the approved schedule. The delay is tracked from the Intended Completion Date (stipulated in the contract plus any formally approved Extension of Time). This deduction shall be in the form of liquidated damages which shall be 1/10 of 1% (0.1%) of the value of the unperformed or delayed services per day. The Procuring Entity can terminate the contract, and forfeit the performance security, once the maximum amount of liquidated damages (10% of the value of the contract) is reached.</p><p>&nbsp;</p><p>Payment disbursement will follow the schedule outlined below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:553px\"><thead><tr><th scope=\"col\" style=\"vertical-align:middle\"><p><strong>Deliverable</strong></p></th><th scope=\"col\" style=\"vertical-align:middle\"><p><strong>Description</strong></p></th><th scope=\"col\" style=\"vertical-align:middle\"><p><strong>Frequency/</strong></p><p><strong>Timeline</strong></p></th><th scope=\"col\" style=\"vertical-align:middle\"><p><strong>Payment Schedule in (%)</strong></p></th></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:108px\"><p>Inception report and Prior Results Report</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:223px\"><p>The report will include (i) team composition and quality assurance protocol of IVA, (ii) responsibilities of each team member, and&nbsp;</p><p>(iii) a verification action plan for each year including detailed modalities (i.e., survey methodology, staffing and verification arrangements) for DLIs/ DLRs based on the agreed protocol; and the confidentiality clause (see Annex B).&nbsp;&nbsp;</p>&nbsp;<p>The inception report will also cover names of sites and offices that would be visited, agreed days and dates for each visit, details of the field survey to be carried out by the IVA, coordination and logistics arrangements needed by IVA and output formats for each site visit that will go in the IVA&rsquo;s verification report.&nbsp;</p>&nbsp;<p>Further, it shall include a report on the conduct of training on the indicator system verification with the PMO.</p>&nbsp;<p>The PMO will share the inception report with the World Bank for review and comment.</p>&nbsp;<p>A Prior Results Report must also be submitted within the same timeline as the inception report. This Prior Results Report shall verify DLRs tagged under &ldquo;Prior Results&rdquo;, or those that could be accomplished before loan effectiveness, see <u>Annex C</u>.&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:140px\"><p>Four (4) weeks after signing of MoU/ Contract</p><br />&nbsp;</td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:82px\"><p>10%</p>&nbsp;<p>Any DLRs included in the Prior Results Report shall entitle the IVA to payment beyond 10% in accordance to the payment scheme for Results verification report (RVR)&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:108px\"><p>Results verification report (RVR)</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:223px\"><p>The IVA would be required to carry out verification against each DLRs annually, semi-annually, quarterly as determined by the PMO during implementation.&nbsp;</p>&nbsp;<p>For Year 1, the IVA is required to carry out verification against DLRs included in the &ldquo;Prior Results&rdquo; but not yet verified in the initial Prior Results Report.&nbsp;</p>&nbsp;<p>RVRs will include (i) an executive summary of key findings, including a table showing, for each DLR reviewed, the target, achievement reported by PMO, verification outcome (achieved, not achieved, partially achieved, the extent to which achieved); (ii) summary of progress for each DLR indicating the comparison of achievement against annual targets; (iii) recommendations to PMO on pending steps required for unmet DLRs/ partially achieved DLRs; (iv)&nbsp; outline of methodologies used for verification and analysis of data and the process documentation;&nbsp; (v) summary statistics for verification including tables, figures and related written analysis; (vi) annexes/attachments (e.g., associated survey reports, expert reports,&nbsp; data collection tools, and complete, cleaned data).</p>&nbsp;<p>The RVR would be prepared and submitted to the PMO for approval. The approved RVR will be submitted to the World Bank through the DOF for review, as a requirement for loan disbursement.&nbsp;</p>&nbsp;<p>Further, all RVR data should be available to the database system that is designed and set up by the IVA as a back-end data processing system.&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:140px\"><p>Twice each year at the time mutually agreed with PMO.</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:82px\"><p>80%</p>&nbsp;<p>Disbursed based on percentage share in Loan Proceeds of Verified DLR vis a vis Total Loan Proceeds of DLRs covered by this TOR.&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:108px\"><p>Assignment Completion Report</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:223px\"><p>This will be a consolidated report at the end of the Program that will provide verification for all the achievements throughout the program period, inclusive of the lessons learned and recommendations.&nbsp;</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:140px\"><p>One month before PSAT program completion date</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:82px\"><p>10%</p></td></tr></tbody></table><p><br />&nbsp;</p><ol><li><p>Experience and Qualifications Requirements for the Independent Verification Agency (IVA)</p></li></ol><p>&nbsp;</p><p>PSAT is funded through a Program-for-Results Financing (PforR) Loan. Under this lending instrument the World Bank disburses funds directly to Government of the Philippines contingent upon meeting the agreed result areas (RAs) which will be assessed using Disbursement-Linked Indicators (DLIs) and verified through the Disbursement-Linked Results (DLRs). DLIs are the framework/ indicators and DLRs are the specific targets/achievements within that framework.</p><p>&nbsp;</p><p>As such, a Verification Agent is warranted to conduct surveys for the verification of select agriculture and institutional related performance results such as the yield of rice production, income of rice farmers and production performance of selected high value crops among other statistics.</p><p>&nbsp;</p><p>The Consultancy Firm or Evaluation Team will be selected through the Quality Based Selection (QBS) process.</p><p>&nbsp;</p><p>The Independent Verification Agency (IVA) must provide consulting service contracts and Certificate of Completion as reference attachments. The IVA must submit proof of employment for the project team members, including employment contracts, labor service agreements, or proof of willingness to undertake the project. Additionally, the IVA must provide documents demonstrating the project team members&rsquo; roles in similar projects, including: work content descriptions, project approval certificates, copies of work outcomes.</p><p>&nbsp;</p><p>The IVA could be any locally registered and specialized firm having the following experience and qualifications:</p><p>&nbsp;</p><ol><li>The IVA must be a third party with no conflict of interest with any project implementation unit at any level- the firm shall have no financial or institutional interests that could conflict with its verification mandate;</li></ol><p>&nbsp;</p><ol><li>The IVA must have at least eight (8) years of experience in providing similar consulting services in government and/or private project evaluation, rural and agricultural statistics or planning, policy and theoretical research, government agency surveys, social assessments, or related fields.</li></ol><p>&nbsp;</p><ol><li>The IVA must have completed similar consulting services with project cost in the amount of twenty five percent (25%) of the Estimated Project Cost within the past ten (10) years.&nbsp;</li></ol><p>&nbsp;</p><ol><li>The IVA must have completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB), experience with results-based loans is preferred;</li></ol><p>&nbsp;</p><ol><li>The IVA should have demonstrated capacity to collect and verify gender-disaggregated data, with experience in applying gender-sensitive verification approaches;</li></ol><p>&nbsp;</p><ol><li>Have access to data management software and IT infrastructure with demonstrated ability to carry out data processing and analysis.&nbsp;&nbsp;</li></ol><p>&nbsp;</p><ol><li>The project team members assembled for this consulting activity should have participated in or independently completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB), experience with results-based loans is preferred; and</li></ol><p>&nbsp;</p><ol><li>The IVA must provide the following Project Team Key Members for this consulting activity:</li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:552px\"><thead><tr><th scope=\"col\" style=\"background-color:#efefef; vertical-align:middle\"><p><strong>Project Team Member</strong></p></th><th scope=\"col\" style=\"background-color:#efefef; vertical-align:middle\"><p><strong>Project Role and Tasks</strong></p></th><th scope=\"col\" style=\"background-color:#efefef; vertical-align:middle\"><p><strong>Experience Required</strong></p></th></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Team Leader</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>Shall represent the IVA in meeting with PMO and World Bank staff&nbsp;</li></ul>&nbsp;<ul><li>Shall be responsible for overseeing timely implementation of all tasks assigned to the IVA by PMO.&nbsp;</li></ul>&nbsp;<ul><li>Coordinate and guide team members in carrying out the activities under this consultancy.&nbsp;</li></ul>&nbsp;<ul><li>Coordinate with implementing agencies to monitor the achievement of results.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Ensure assessments are carried out in compliance with the verification protocols and submission of deliverables as per the agreed schedule.&nbsp;</li></ul>&nbsp;<ul><li>Perform monitoring and reporting tasks (details will be mentioned in the inception report)&nbsp;</li></ul>&nbsp;<ul><li>Monitor and supervise IVA team members to ensure the timely delivery of reports&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Consolidate and prepare annual verification reports and other such reports&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Any other work as directed by PMO</li></ul>&nbsp;<p>.</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>Minimum PhD/Master&rsquo;s Degree in economics/ statistics/ agriculture economics/ or related subject&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>At least 10 years of experience in survey design, statistical analysis, qualitative and quantitative research, preparation of evaluation reports (such as Baseline Surveys, Mid-term Reviews, and Implementation Completion Reports) for multi-disciplinary sectors for governments and or government programs.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Demonstrated experience in implementation of institutional reforms, including sound knowledge and working experience in result-based program management&nbsp;</li></ul>&nbsp;<ul><li>Knowledge of monitoring and evaluation tools&nbsp;</li></ul>&nbsp;<ul><li>Exceptional leadership skills to manage diverse stakeholders&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Experience of leading at least five large scale independent verification assignments involving quantitative data collection, questionnaire design and large-scale surveys.</li></ul></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Agriculture Economist and Co-team Leader</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>Shall be responsible for all types of technical coordination</li></ul>&nbsp;<ul><li>Prepare Annual Work Plan and Budget (AWPB) for the IVA activities</li></ul>&nbsp;<ul><li>Actively participate in all physical verification processes</li></ul>&nbsp;<ul><li>Review the documents related to policies, regulatory frameworks, strategic plans, and MoUs</li></ul>&nbsp;<ul><li>Finalize the survey questionnaires.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Finalize the annual verification reports.&nbsp;</li></ul>&nbsp;<ul><li>Coordinate and actively work with the team members in carrying out the activities.</li></ul></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>PhD/ Master&rsquo;s degree in agriculture&nbsp; Economics or related fields&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>At least 10 years of experience working in the agriculture sector&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Should have extensive knowledge of sectoral interlinkages particularly relating to agriculture policies, agriculture production technologies, agriculture markets, and food safety.&nbsp;&nbsp;</li></ul></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Agriculture Specialist</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>Shall&nbsp;be responsible for&nbsp;all types of technical coordination.&nbsp;</li></ul>&nbsp;<ul><li>Assist&nbsp;in preparing Annual Work Plan and Budget (AWPB) for the IVA activities.&nbsp;</li></ul>&nbsp;<ul><li>Actively&nbsp;participate&nbsp;in all physical verification processes.&nbsp;</li></ul>&nbsp;<ul><li>Review the documents related to policies, regulatory frameworks, strategic plans, and&nbsp;MoUs.&nbsp;</li></ul>&nbsp;<ul><li>Prepare the survey questionnaires.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Draft the annual verification reports.&nbsp;</li></ul></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>Master&rsquo;s degree in agriculture or related fields At least 5 years of experience working in the agriculture sector.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Should have extensive knowledge of sectoral interlinkages particularly relating to Agroclimatic zones, agriculture policies, agriculture production technologies, agriculture markets, and food safety.&nbsp;&nbsp;</li></ul></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Monitoring and Evaluation Expert</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>provide direction and leadership for all IVA fieldwork;&nbsp;</li></ul>&nbsp;<ul><li>supervise fieldwork and provide quality assurance for all instruments, activities, and outputs; and&nbsp;</li></ul>&nbsp;<ul><li>lead on data collection and processing protocols</li></ul></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>A professional with relevant experience of at least 4 years and a proven track record of M&amp;E, including overseeing field data collection, and at least a Master&rsquo;s degree or equivalent in Public Administration, Economics, Statistics, Business Management/ Administration or other relevant field.</li></ul></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Survey and Data Management Specialist</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>Prepare survey tools for the verification of achievements for relevant DLIs.&nbsp;</li></ul>&nbsp;<ul><li>Supervise and monitor data collection throughout the period.&nbsp;</li></ul>&nbsp;<ul><li>Prepare data quality assurance plans.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Systematically store and manage the collected data.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Preserve the cleaned data and ensure data security.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Review the data available in the program MIS.&nbsp;</li></ul>&nbsp;<ul><li>Provide enumerators training on data collection&nbsp;</li></ul>&nbsp;<ul><li>Any other work as required under this consultancy and or as directed by the team leader from time to time</li></ul></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>Master&rsquo;s degree in economics/development study/social science/ statistics or related field&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>At least 3-5 years of working experience in survey design, ICT-based data collection, and data management.</li></ul></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:117px\"><p>Data analyst</p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:233px\"><ul><li>Analyze the collected data through the survey.&nbsp;</li></ul>&nbsp;<ul><li>Review and analyze the data available in the program MIS.&nbsp;</li></ul>&nbsp;<ul><li>Provide inputs in survey tool preparation and data collection process.&nbsp;</li></ul>&nbsp;<ul><li>Prepare the draft reports on annual DLI achievements based on the analysis.&nbsp;&nbsp;</li></ul><br /><br /><br />&nbsp;<ul><li>Identify the critical areas that need special actions for the achievement of related DLIs.&nbsp;&nbsp;</li></ul>&nbsp;<ul><li>Any other work as required under this consultancy and or as directed by the team</li></ul></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:202px\"><ul><li>Technical staff with a proven track record in processing and analyzing quantitative and qualitative data, database management, and at least a bachelor&rsquo;s degree or equivalent in economics, statistics, or other relevant fields.</li></ul></td></tr></tbody></table><p>&nbsp;</p><p>The service provider will also provide Data Enumerators and field coordinators who shall be tasked to:</p><p>&nbsp;</p><ul><li>Participate in the enumerators&rsquo; training&nbsp;</li><li>Collect data from the field.&nbsp;</li><li>Provide written feedback based on experience in the field.&nbsp;&nbsp;</li><li>Conduct interviews (if necessary) with the government field staff and other relevant stakeholders</li></ul><p>&nbsp;</p><p>There is no mandatory number of Data Enumerators and field coordinators, their number and additional function shall be included in the prospective service provider&rsquo;s technical proposal, and shall be graded accordingly.</p><p>&nbsp;</p><p><strong>6. Shortlisting Criteria</strong></p><p>&nbsp;</p><p>The prospective Independent Verification Agency must comply with the following Shortlisting Criteria before being required to submit a Technical Proposal for Evaluation:</p><p><br />&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:553px\"><tbody><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>Criteria</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><p><strong>Qualification</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><p><strong>Documentary Requirement</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\"><p><strong>Pass/Fail</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>General Experience</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><p>IVA must have at least eight (8) years of experience in providing similar consulting services in government and/or private project evaluation, rural and agricultural statistics or planning, policy and theoretical research, government agency surveys, social assessments, or related fields</p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><ol><li>DTI/CDA/SEC Registration and Articles of Incorporation</li><li>BIR Certificate of Registration</li><li>Latest Business Permit</li></ol>&nbsp;<p>These must show the company&rsquo;s business/ purpose and year of Establishment</p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>Similar Completed Contracts</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><ol><li>The IVA must have completed similar consulting services with project cost in the amount of twenty five percent (25%) of the Estimated Project Cost within the past ten (10) years&nbsp;</li><li>The IVA must have completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB)&nbsp;</li></ol></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><ol><li>Notice of Award</li><li>Contract of Service in Similar Projects</li><li>Certificate of Completion and/or Acceptance of Work</li></ol>&nbsp;<p>These must show the company&rsquo;s Similar Completed Contracts, its nature, commercial value and&nbsp; year of completion.</p>&nbsp;<p>These projects must also show the firm&rsquo;s capacity to collect and verify gender-disaggregated data, with experience in applying gender-sensitive verification approaches&nbsp;</p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>Information Infrastructure and Data Management Capabilities</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><p>The IVA must have access to data management software and IT infrastructure with demonstrated ability to carry out data processing and analysis.<strong>&nbsp;</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><ol><li>Technical profile of the firm&rsquo;s data processing facilities, secure server infrastructure, and back-end database management system capabilities</li><li>List with proof of licenses for data collection and statistical software used&nbsp;</li></ol></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>Organization Structure and Capabilities</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><p>All key personnel must meet the above mandated qualifications and participated in or independently completed similar consulting services in monitoring and evaluation of projects funded by international financial institutions (such as the World Bank and ADB)&nbsp;</p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><ol><li>Organization Structure</li><li>Curriculum Vitae of each Key Personnel</li><li>Proof of employment (employment contracts/labor agreements) or signed Statements/Letters of Commitment from core key experts expressing willingness to undertake the assignment.&nbsp;&nbsp;</li></ol></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:121px\"><p><strong>No Conflict of Interest</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:144px\"><p>The IVA must be a third party with no conflict of interest with any project implementation unit at any level- the firm shall have no financial or institutional interests that could conflict with its verification mandate</p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:196px\"><ol><li>Sworn declaration that <em><u>&ldquo;the firm is an independent third party with no financial, institutional, or operational conflict of interest with any PSAT Project Implementation Unit at any level &ldquo;</u></em></li></ol></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:92px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>These requirements will be submitted with the Expression of Interest (EOI).</p><p>&nbsp;</p><p><strong>7. Evaluation Criteria</strong></p><p>&nbsp;</p><p>Upon being shortlisted, the Independent Verification Agency must provide all documentary requirements stated above (shortlisting requirements) and the following documents (Technical Proposal):</p><p>&nbsp;</p><ol><li><strong>World Bank Technical Proposal Standard Forms (TECH Forms):</strong><ol><li><strong>Form TECH-1:</strong> Technical Proposal Submission Form.</li><li><strong>Form TECH-2:</strong> Consultant&rsquo;s Organization and Experience (detailed write-ups of relevant projects).</li><li><strong>Form TECH-3:</strong> Comments and Suggestions on the TOR and Counterpart Staff/Facilities.</li><li><strong>Form TECH-4:</strong> Description of Approach, Methodology, and Work Plan.</li><li><strong>Form TECH-5:</strong> Work Schedule and Planning for Deliverables.</li><li><strong>Form TECH-6:</strong> Team Composition, Key Experts&#39; Inputs, and Task Assignments.</li></ol></li></ol><p>Proposals will be evaluated based on the following criteria:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:570px\"><thead><tr><th scope=\"col\" style=\"vertical-align:top\"><p><strong>Criteria</strong></p></th><th scope=\"col\" style=\"vertical-align:top\"><p>Evaluation Criteria</p></th><th colspan=\"2\" scope=\"col\" style=\"vertical-align:top\"><p>Maximum Points</p></th></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:129px\"><p><strong>General Experience</strong></p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:263px\"><p>If years of experience in industry is &gt; 8&nbsp; years but equal to or less than 12 years&nbsp;</p>&nbsp;<p>5 Points&nbsp;</p>&nbsp;<p>If years of experience in industry is &gt; 12&nbsp; years</p>&nbsp;<p>8 Points</p></td><td colspan=\"2\" style=\"border-bottom:1px solid #000000; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:7px\"><p>8 Points</p></td></tr><tr><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:129px\"><p><strong>Similar Completed Contracts</strong></p></td><td style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:263px\"><p>If similar completed contract is &gt; Php 29,000,000&nbsp; (25% of the Php 116M estimated cost) pesos but equal to or less than Php 58,000,000:</p>&nbsp;<p>5 Points&nbsp;</p>&nbsp;<p>If similar completed contract is &gt; Php 58,000,000</p>&nbsp;<p>10 Points</p>&nbsp;<p>If similar completed contracts presents:</p>&nbsp;<ol><li>Experience in M&amp;E projects funded by IFIs (e.g., World Bank, ADB)</li></ol>&nbsp;<p>Add 3 Points</p>&nbsp;<ol><li>Demonstrated experience specifically handling Results-Based Loans / Program-for-Results (PforR) / DLI verification</li></ol>&nbsp;<p>Add 3 Points</p>&nbsp;<ol><li>Multiple Completed Contracts&nbsp;</li></ol>&nbsp;<p>Add 2 Points</p>&nbsp;<ol><li>Completed Contracts with demonstrated capacity to verify gender- and sector disaggregated data: Add 1 Point.</li></ol></td><td colspan=\"2\" style=\"border-bottom:1px solid #000000; border-left:1px solid #000000; border-right:1px solid #000000; border-top:1px solid #000000; vertical-align:top; width:7px\"><p>20 Points</p></td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #000000; vertical-align:top; width:129px\"><p><strong>Methodology, Workplan and Timeline</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #000000; vertical-align:top; width:263px\"><p>If the following are present:</p>&nbsp;<ol><li>Comprehensive DLI and DLR verification plan with a statistically sound sampling method, detailing their proposed confidence level and a margin of error within and below 10% sampling design and primary/secondary data collection methods:&nbsp;</li></ol>&nbsp;<p>Add 15 Points.</p>&nbsp;<ol><li>Detailed field operations manual and survey plan aligned with World Bank Verification Protocols:&nbsp;</li></ol>&nbsp;<p>Add 10 Points.</p>&nbsp;<ol><li>Realistic work schedule ensuring Results Verification Reports (RVR) are <strong>submitted semi-annually:&nbsp;</strong></li></ol>&nbsp;<p>Add 5 Points.</p></td><td colspan=\"2\" style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #000000; vertical-align:top; width:7px\"><p>30 Points</p></td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:129px\"><p><strong>IT Infrastructure and Data Management Capabilities</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:263px\"><p>If the following are present:</p>&nbsp;<ol><li>Demonstrated back-end database system capable of securely storing primary data:&nbsp;</li></ol>&nbsp;<p>Add 6 Points.</p>&nbsp;<p>Documented proof of active licenses for required data collection and statistical software:&nbsp;</p>&nbsp;<p>Add 4 Points</p></td><td colspan=\"2\" style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:7px\"><p>10 Points</p></td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:129px\"><p><strong>Organization Structure and Personnel Capabilities</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:263px\"><p>If the following are present:</p>&nbsp;<ol><li>Key Experts (Team Leader, Agriculture Economist, Agriculture Specialist, M&amp;E Expert, Survey Specialist,&nbsp;</li><li>) meet all specified educational and minimum experience requirements:&nbsp;</li></ol>&nbsp;<p>20 Points.</p>&nbsp;<ol><li>With additional on-boarding of specialist personnel:&nbsp;</li></ol>&nbsp;<p>Add 5 Points.</p>&nbsp;<ol><li>Clear logistical strategy and adequate deployment numbers for Data Enumerators and field coordinators:&nbsp;</li></ol>&nbsp;<p>Add 5 Points.</p></td><td colspan=\"2\" style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:7px\"><p>30 Points</p></td></tr><tr><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:129px\"><p><strong>Other Additional Relevant Credentials&nbsp;</strong></p></td><td style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:263px\"><ol><li>Submitted the any of the following:<ol><li>ISO 20252:2019 (Market, Opinion, and Social Research, including Insights and Data Analytics)&nbsp;</li><li>ISO 9001:2015 (Quality Management Systems - QMS)&nbsp;</li><li>ISO/IEC 27001:2022 (Information Security Management Systems - ISMS)&nbsp;</li><li>ISO/IEC 17020:2012 (Conformity Assessment &mdash; Requirements for the Operation of Various Types of Bodies Performing Inspection)&nbsp;</li></ol></li></ol><p>Add 2 Points</p></td><td colspan=\"2\" style=\"border-bottom:1px solid #1f1f1f; border-left:1px solid #1f1f1f; border-right:1px solid #1f1f1f; border-top:1px solid #1f1f1f; vertical-align:top; width:7px\"><p>2 points</p></td></tr></tbody></table><p><br />&nbsp;</p><p><strong>8. Subcontracting and Joint Venture</strong></p><p>&nbsp;</p><p>In case the Prospective IVA is a Joint Venture, the Joint Venture Agreement must be submitted as a Shortlisting Requirement. The Joint Venture Partners will be evaluated in accordance with the provisions of RA 12009.&nbsp;</p><p>&nbsp;</p><p>Subcontracting for this procurement is not allowed.</p><p>&nbsp;</p><p><strong>9. Breach of Contract</strong></p><p>&nbsp;</p><p>The procuring entity may suspend or terminate the Contract in case of fraud, gross negligence and inordinate delay in the implementation of the agreed timeline of activities by written notice of said suspension or termination.</p><p>&nbsp;</p><p>In case of suspension, this shall be immediately effective upon issuance of notice of suspension until lifted by the resolution erring fraud, gross negligence or inordinate delay.&nbsp;</p><p>&nbsp;</p><p>On the other hand, if termination shall be imposed, the procuring entity may terminate the Contract should the submitted Reports fail to meet or comply with the requirements stated above.</p><p>&nbsp;</p><p>The termination shall take effect thirty (30) calendar days after notice of suspension or notice of non-compliance to submitted Report&rsquo;s requirements, if there is no resolution to the non-compliance, erring fraud, gross negligence or inordinate delay acceptable to the aggrieved party within the period above provided.&nbsp;</p><p>&nbsp;</p><p><strong>10. Supervision and Management</strong></p><p>&nbsp;</p><p>The verification agency is responsible for timely communication with the DA, PMO and the World Bank regarding project-related matters and must comply with their supervision and oversight. The PMO will provide the necessary conditions to facilitate the execution of tasks for the consulting experts. The verification agency must also cooperate with the PMO to complete the World Bank&rsquo;s requirements related to DLIs and DLRs verification and monitoring &amp; evaluation.</p><p>&nbsp;</p><p><strong>11. Confidentiality Statement</strong></p><p>&nbsp;</p><p>All data and information received for the purpose of this assignment are to be treated confidentially and are only to be used in connection with the execution of this TOR. All intellectual property rights arising from the execution of this TOR are assigned to the Philippines Government represented by the DA. The contents of written materials obtained and used in this assignment may not be disclosed to any third parties without the expressed advance written authorization of the DA.</p><p>&nbsp;</p><p><strong>12. Attachments:</strong></p><p>&nbsp;</p><ul><li>Annex A: PSAT Disbursement Linked Indicators (DLIs) and Schedule</li><li>Annex B: PSAT DLI Verification Protocol&nbsp;</li><li>Annex C: PSAT DLI Prior Results&nbsp;</li><li>Annex D: PSAT Project Appraisal Document</li></ul><p><br /><br />&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:554px\"><tbody><tr><td style=\"border-bottom:1px solid #ffffff; border-left:1px solid #ffffff; border-right:1px solid #ffffff; border-top:1px solid #ffffff; vertical-align:top\"><p>Prepared by:</p></td></tr><tr><td style=\"border-bottom:1px solid #ffffff; border-left:1px solid #ffffff; border-right:1px solid #ffffff; border-top:1px solid #ffffff; vertical-align:top\">&nbsp;<p><strong>MARIA CLAVELIA O. DOMINGO</strong></p><p>PSAT &amp; TASAT PMO Planning, Monitoring and Evaluation Unit Head</p></td></tr><tr><td style=\"border-bottom:1px solid #ffffff; border-left:1px solid #ffffff; border-right:1px solid #ffffff; border-top:1px solid #ffffff; vertical-align:top\"><p>Noted by:</p><br />&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid #ffffff; border-left:1px solid #ffffff; border-right:1px solid #ffffff; border-top:1px solid #ffffff; vertical-align:top\"><p><strong>ARNEL V. DE MESA, CESO III</strong></p><p>Assistant Secretary for Special Concerns and ODA</p><p>PSAT &amp; TASAT PMO Project Director</p></td></tr></tbody></table><p><br /><br />&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00473388","notice_type":"Request for Expression of Interest","noticedate":"06-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-22T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P180117","project_name":"Building Institutions And Systems to Harness And Realize Agenda 2063 Project","bid_reference_no":"ET-AUC-564016-CS-INDV","bid_description":"INDIVIDUAL CONSULTANT TO SUPPORT SAP FICO ABAP ENHANCEMENTS","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"Chenga-Bwalyak@AfricanUnion.org","contact_name":"Kaputo Chenga -Bwalya","contact_organization":"Africa Union Commission","contact_phone_no":"+251982168552","submission_date":"2026-10-06T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; INDIVIDUAL CONSULTANT)</strong></p><p><strong>Country: </strong>Ethiopia</p><p><strong>Name of Project: </strong>The Building Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</p><p><strong>Grant No</strong>: P180117</p><p><strong>Assignment Title</strong>: Individual Consultant to Support SAP FICO ABAP Enhancements</p><p>&nbsp;</p><p><strong>Reference No. </strong>ET-AUC-564016-CS-INDV</p><p>&nbsp;</p><p>The African Union Commission has received financing from the World Bank toward the cost of <em>The Building</em><em> Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</em> and intends to apply part of the proceeds for consulting services. The consulting services (&ldquo;the Services&rdquo;) include; Efficient DSA calculation process thereby reducing the risks resulting from human errors; Timely retirements of imprests and Accurate Financial statements generated from SAP without any manual intervention by users.Efficient fund availability approval process. Specific tasks include:</p><ul><li>Establish High level requirements through stakeholders&rsquo; consultations and come up with a Business Requirement Document.</li><li>Develop a Financial statement template in SAP to allow users to download financial statements from the system.</li><li>Review and Implement SAP Travel Management standard DSA calculation functionality based on the requirements.</li><li>Automation of Fund availability process and ensuring commitment is done at the initial stage</li><li>Make changes to the budget execution report as per business requirements.</li><li>Develop urgent PBFA reports as per business requirements.</li><li>Preparation of Test scripts for Unit and Integration Testing.</li><li>Lead Business users in Unit and Integration Testing.</li><li>Preparation of User Guides, Test Scripts (Unit/Integration), Configuration and Technical documentation.</li><li>Conduct and coordinate Super Users and business users training.</li><li>Conduct and Lead / Guide Cut-over activities before Go-live of Travel Management DSA calculation functionality.</li><li>Conduct Training / Knowledge transfer / Hand Over to the in-house SAP Technical Team.</li></ul><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this Request for Expression of Interest.</p><p>The African Union Commission now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><p><strong>Education</strong></p><p>Bachelor&rsquo;s degree in information technology, Information Systems, Computer Science /Engineering or related discipline</p><p><strong>Certification and Experience</strong></p><p><strong>Minimum Qualifications</strong></p><ul><li><strong>SAPCertified ABAP Consultant</strong> with <strong>5&ndash;7 years of professional experience</strong> in SAP ABAP development.</li><li>Participation in <strong>at least two fullcycle SAP implementation, upgrade, or enhancement projects</strong>.</li><li>Demonstrated experience supporting <strong>FICO, SCM, Travel Management</strong> modules through custom development and workflow development.</li></ul><p><strong>Core Technical Skills (ABAP Development)</strong></p><ul><li><strong>Advanced ABAP Programming</strong><ul><li>Classical and Object-Oriented ABAP</li><li>RICEF development (Reports, Interfaces, Conversions, Enhancements, Forms)</li></ul></li><li><strong>Enhancement Framework Expertise</strong><ul><li>BADIs, User Exits, Customer Exits, Enhancement Points</li></ul></li><li><strong>Data Dictionary &amp; Core Development</strong><ul><li>Tables, structures, views, search helps, lock objects</li><li>Performance tuning and code optimization</li></ul></li><li><strong>Interface Development</strong><ul><li>IDocs, BAPIs, RFCs, Web Services (SOAP/REST)</li></ul></li><li><strong>Form Technologies</strong><ul><li>SMARTFORMS</li><li>SAPscript (optional)</li><li>Adobe Forms (added advantage)</li></ul></li></ul><p><strong>Workflow Development Skills</strong></p><ul><li><strong>Custom Workflow Design &amp; Development</strong><ul><li>Creation of workflow templates for Finance, SCM, and Travel processes</li><li>Multilevel approval workflows</li><li>Deadline monitoring, agent determination, and rule configuration</li></ul></li><li><strong>Workflow Configuration</strong><ul><li>Event linkage, task creation, container elements, bindings</li><li>Integration with organizational management (OM)</li></ul></li><li><strong>Troubleshooting &amp; Optimization</strong><ul><li>Workflow logs, error handling, performance tuning</li><li>Enhancing workflows using BADIs and custom methods</li></ul></li></ul><p><strong>Web Dynpro for ABAP Skills</strong></p><ul><li>Development of <strong>custom Web Dynpro components</strong>, views, and controllers</li><li>UI logic, context mapping, and FPM (Floorplan Manager) exposure</li><li>Integration with backend logic and workflow tasks.</li></ul><p><strong>Additional Technical Competencies</strong></p><ul><li><strong>Screen Programming</strong><ul><li>Module pool programming</li><li>Custom transactions and dialog programming</li></ul></li><li><strong>Object-Oriented Design</strong><ul><li>Class-based development, interfaces, inheritance</li></ul></li></ul><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>A Consultant will be selected in accordance with the Individual Consultant<em> </em>selection method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours <em>i.e. 0900 to 1700 hours</em>.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>22 October 2026</strong></p><p>&nbsp;</p><p>African Union Commission,</p><p>Attn: Head of Supply Chain Management Division</p><p>Building C, 3rd Floor,</p><p>P.O Box 3243,<em>&nbsp;</em>Roosevelt Street</p><p>Addis Ababa, Ethiopia</p><p>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</p><p>Fax: +251 (0) 11 551 0442; +251 11-551-0430</p><p>E-mails: tender@africanunion.org</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p><strong><em><u>TERMS OF REFERENCE</u></em></strong></p><p>&nbsp;</p><p><strong><em>SAP FICO ABAP ENHANCEMENTS</em></strong></p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp; Introduction.. 5</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp; Project Background.. 5</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp; AU CURRENT PAINS AND GAPS. 7</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp; MERITS OF IMPLEMENTING REQUIRED FUNCTIONALITY.. 7</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp; OBJECTIVE OF THE SERVICE. 7</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp; SCOPE OF SERVICES AND TASKS. 7</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp; DELIVERABLES FOR THE ASSIGNMENT. 8</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp; QUALIFICATIONS AND SKILLS. 9</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp; EVALUATION AND QUALIFICATION CRITERIA.. 10</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; TIMEFRAME AND SCHEDULE OF DELIVERABLES. 11</p><p>11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CLIENT INPUT AND REPORTING.. 12</p><p>12.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Down Payments. 13</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Introduction</strong></li></ol><p>The African Union (AU) was established as a unique Pan African continental body, charged with spearheading Africa&rsquo;s rapid integration and sustainable development by promoting unity, solidarity, cohesion and cooperation among the peoples of Africa and African States as well as developing a New Partnership worldwide. Its Headquarters is located in Addis Ababa, capital city of Ethiopia.</p><p>The African Union Commission (AUC) is the secretariat of the AU, which is the key organ playing a central role in the day-to-day management of the AU.&nbsp; Amongst other mandates, the AUC represents the Union and defends its interests; elaborates draft common positions of the Union; prepares strategic plans and studies for the consideration of the Executive Council; elaborates, promotes, coordinates and harmonizes the programmes and policies of the Union with those of the Regional Economic Commissions (RECs) and ensures the mainstreaming of gender in all programmes and activities of the Union.</p><ol><li><strong>Project Background</strong></li></ol><p>In 2008, AUC embarked on automation project and selected the SAP software to bring efficiency, transparency and accountability in business processes and information management. The project went live at the AUC in 2009, and with addition of several modules over the years, the system has since been rolled out to over 45 ROs/LOs and 8 Organs.</p><p>Currently, AUC runs SAP ERP ECC 6, Enhancement Package Level 7 (EHP7) system having implemented the following key modules;</p><ul><li>Financial and Controlling (FI/CO) including Fund Management, Treasury Management, Bank Communication Management.</li><li>Human Resource (Payroll, Time Management, Personnel Administration, Organization Management, &amp; Personnel Development)</li><li>Material Management (Purchasing and Inventory Management)</li><li>Travel Management</li><li>Employee and Manager Self Service</li><li>Electronic Document Workflow (SAP Document Access solution)</li><li>Integration with OpenText 10 for Document Archival</li><li>Integration to SAP SuccessFactors Recruiting system</li><li>Integration with SAP Governance, Risk &amp; Compliance system (GRC) for user management</li><li>Interface with other in-house applications e.g. Medical System, AMERT,</li></ul><p>The diagram below depicts the current SAP landscape alongside AUC&rsquo;s vision by 2026/2027.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Despite the numerous strides made with the implementation of the modules above, the current system has some gaps and challenges in terms of system utility, process integration, data issues, reporting and inflexibility to some needs of the organization.&nbsp; In cognizance of these gaps and in seeking to fully leverage the use of SAP within the Commission, there is therefore need to enhance/upgrade the ERP to a more robust system that will better meet the current and future needs.</p><p>&nbsp;To date, the approach to automation at the AUC has focused on the implementation of point solutions that do not adequately address the present needs of AU Business Units, ROs and Policy Organs as a whole. The solutions provided have essentially automated the existing manual processes rather than follow best practices.&nbsp; Lack of funds to adopt new SAP technologies has led to heavy customization of processes such as travel, financial management and reporting thus restricting the value that SAP can provide. Further, inadequate capacity building has rendered the ERP unit as a fire-fighter on day-to-day business support rather than the unit focusing on innovation to provide new solutions. There is great potential to maximize utility of SAP through varied and targeted training of both business users and the ERP team members.</p><ol><li><strong>AU CURRENT PAINS AND GAPS</strong></li></ol><p>The AU has deployed the SAP Travel Management Module without the DSA calculation component resulting in DSA being manually calculated by excel by the respective payment processing Division of the Directorate of Finance.&nbsp; The same also affects the imprest retirement process.&nbsp; SAP users are not able to generate financial statements from SAP system.&nbsp; SAP users want the budget execution report to be reviewed and enhanced. SAP users are creating manual reports in excel.&nbsp; Fund availability is being done manually by all Departments.</p><p>&nbsp;</p><ol><li><strong>MERITS OF IMPLEMENTING REQUIRED FUNCTIONALITY</strong></li></ol><ul><li>Efficient DSA calculation process thereby reducing the risks resulting from human errors</li><li>Timely retirements of imprests.</li><li>Accurate Financial statements generated from SAP without any manual intervention by users.</li><li>Efficient fund availability approval process.</li></ul><ol><li><strong>OBJECTIVE OF THE SERVICE</strong></li></ol><p>The objective of the assignment is to implement the functionality (Section 4) mentioned above.&nbsp; To achieve the stated objective, AUC wishes to engage the services of a consultant to work with the Commission to develop and implement the required functionality.</p><p>&nbsp;</p><ol><li><strong>SCOPE OF SERVICES AND TASKS</strong></li></ol><p>The expected scope of services and tasks will be as follows: -</p><ul><li>Establish High level requirements through stakeholders&rsquo; consultations and come up with a Business Requirement Document.</li><li>Develop a Financial statement template in SAP to allow users to download financial statements from the system.</li><li>Review and Implement SAP Travel Management standard DSA calculation functionality based on the requirements.</li><li>Automation of Fund availability process and ensuring commitment is done at the initial stage</li><li>Make changes to the budget execution report as per business requirements.</li><li>Develop urgent PBFA reports as per business requirements.</li><li>Preparation of Test scripts for Unit and Integration Testing.</li><li>Lead Business users in Unit and Integration Testing.</li><li>Preparation of User Guides, Test Scripts (Unit/Integration), Configuration and Technical documentation.</li><li>Conduct and coordinate Super Users and business users training.</li><li>Conduct and Lead / Guide Cut-over activities before Go-live of Travel Management DSA calculation functionality.</li><li>Conduct Training / Knowledge transfer / Hand Over to the in-house SAP Technical Team.</li></ul><p>&nbsp;</p><ol><li><strong>DELIVERABLES FOR THE ASSIGNMENT</strong></li></ol><p>&nbsp;</p><p>The deliverables for this engagement will include:</p><ul><li>Business Requirements Documents Sign off</li><li>Test scripts / Sign off Documents</li><li>Signed off Monthly Report</li><li>Signed off Support Documents</li><li>Transport Requests List</li><li>Technical documentation for RICEFW</li><li>Knowledge Transfer, Training and Hand Over to Super Users / Technical Users</li></ul><p>&nbsp;</p><ol><li><strong>QUALIFICATIONS AND SKILLS </strong></li></ol><p>&nbsp;</p><p><strong>8.1 Education</strong></p><p>Bachelor&rsquo;s degree in information technology, Information Systems, Computer Science /Engineering or related discipline</p><p><strong>8.2&nbsp;&nbsp; Certification and Experience</strong></p><ul><li><ol><li><strong>Minimum Qualifications</strong></li></ol></li><li><strong>SAPCertified ABAP Consultant</strong> with <strong>5&ndash;7 years of professional experience</strong> in SAP ABAP development.</li><li>Participation in <strong>at least two fullcycle SAP implementation, upgrade, or enhancement projects</strong>.</li><li>Demonstrated experience supporting <strong>FICO, SCM, Travel Management</strong> modules through custom development and workflow development.<ol><li><strong>Core Technical Skills (ABAP Development)</strong></li></ol></li></ul><ul><li><strong>Advanced ABAP Programming</strong><ul><li>Classical and Object-Oriented ABAP</li><li>RICEF development (Reports, Interfaces, Conversions, Enhancements, Forms)</li></ul></li><li><strong>Enhancement Framework Expertise</strong><ul><li>BADIs, User Exits, Customer Exits, Enhancement Points</li></ul></li><li><strong>Data Dictionary &amp; Core Development</strong><ul><li>Tables, structures, views, search helps, lock objects</li><li>Performance tuning and code optimization</li></ul></li><li><strong>Interface Development</strong><ul><li>IDocs, BAPIs, RFCs, Web Services (SOAP/REST)</li></ul></li><li><strong>Form Technologies</strong><ul><li>SMARTFORMS</li><li>SAPscript (optional)</li><li>Adobe Forms (added advantage)</li></ul></li></ul><ol><li><ol><li><strong>Workflow Development Skills</strong></li></ol></li></ol><ul><li><strong>Custom Workflow Design &amp; Development</strong><ul><li>Creation of workflow templates for Finance, SCM, and Travel processes</li><li>Multilevel approval workflows</li><li>Deadline monitoring, agent determination, and rule configuration</li></ul></li><li><strong>Workflow Configuration</strong><ul><li>Event linkage, task creation, container elements, bindings</li><li>Integration with organizational management (OM)</li></ul></li><li><strong>Troubleshooting &amp; Optimization</strong><ul><li>Workflow logs, error handling, performance tuning</li><li>Enhancing workflows using BADIs and custom methods</li></ul></li></ul><ol><li><ol><li><strong>Web Dynpro for ABAP Skills</strong></li></ol></li></ol><ul><li>Development of <strong>custom Web Dynpro components</strong>, views, and controllers</li><li>UI logic, context mapping, and FPM (Floorplan Manager) exposure</li><li>Integration with backend logic and workflow tasks.<ol><li><strong>Additional Technical Competencies</strong></li></ol></li></ul><ul><li><strong>Screen Programming</strong><ul><li>Module pool programming</li><li>Custom transactions and dialog programming</li></ul></li><li><strong>Object-Oriented Design</strong><ul><li>Class-based development, interfaces, inheritance</li></ul></li></ul><ol><li><ol><li><strong>&nbsp;Required Documentation</strong></li></ol></li></ol><p>The candidate must provide a <strong>detailed CV</strong> that clearly outlines:</p><ul><li>All ABAP development activities performed (RICEF objects, enhancements, forms)</li><li>Workflow development and configuration tasks</li><li>Web Dynpro applications developed</li><li>Modules supported (FICO, SCM, Travel Management)</li><li>Project roles, responsibilities, and duration</li><li>Certifications and relevant technical training</li></ul><ol><li><strong>TIMEFRAME AND SCHEDULE OF DELIVERABLES</strong></li></ol><p>The duration of the assignment is approximated to be <strong>4 (Four) Months</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:20%\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:79%\"><p><strong>Description of Deliverables</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:49px; vertical-align:top; width:20%\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:49px; vertical-align:top; width:79%\"><p>Requirements Gathering</p><ul><li>Inception Report</li><li>Business Blueprint / BRD Sign off / Requirement gathering</li></ul></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:20%\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:79%\"><ul><li>Monthly Progress Report</li><li>Deliverables as per section 7 above:</li></ul><ul><li>Business Requirements Documents Sign off</li><li>Test scripts / User Acceptance Testing Sign off Documents</li><li>Users Guides for Functionalities and RICEFWs developed</li><li>Submission of Technical Documentation for Functionalities and RICEFWs developed</li><li>Signed off Monthly Report</li><li>Signed off Support Documents</li><li>Transport Requests List</li><li>Knowledge Transfer, Training and Hand-Over to Super Users / Technical Users</li></ul></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>CLIENT INPUT AND REPORTING</strong></li></ol><p>&nbsp;</p><p>The Consultants / individual Consultant should report to the Head, Enterprise Resource Planning (ERP) Unit and should closely collaborate with the designated responsible staff.</p><p>On the other hand, the African Union will be responsible and make an endeavour to support the project by participating to fulfil the following:</p><ul><li>Involvement in all aspects of the services.</li><li>Providing accurate and complete information, as needed.</li><li>Making timely and effective completion of the responsibilities, as identified below.</li><li>Provisioning the required prerequisite resources on time.</li><li>Facilitate logistical issues to import and stage equipment.</li><li>Providing timely decisions and approvals</li><li>Completion of site readiness activities and facility setup</li><li>All documents/objectives are accepted at time of delivery within a reasonable time frame.<ul><li>Provide personnel who are knowledgeable about the current African Union&rsquo;s systems</li><li>Provide business user representatives as required by the project plan</li><li>Provide access to all necessary African Union work sites, systems logon and passwords</li><li>Provide access to other materials and resources as needed</li><li>Provide suitable work spaces with desks, chairs, telephones, etc.</li><li>Provide LAN connections giving the onsite team access to the Internet and e-mail.</li></ul></li></ul><ol><li><strong>Down Payments</strong></li></ol><p>The Consultants / individual Consultant will be paid upon submission of deliverables.</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00472554","notice_type":"Request for Expression of Interest","noticedate":"01-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-22T00:00:00Z","submission_deadline_time":"16:30","project_ctry_name":"St. Kitts and Nevis","project_id":"P181991","project_name":"GFPP SKN Caribbean Resilient Renewable Energy Infrastructure Investment Facility","bid_reference_no":"KN-MPIEU-528498-CS-CDS","bid_description":"Technical assessment for sub-sea interconnection","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"2nd Floor Ram’s Complex\nBuckleys, Basseterre, St. Kitts","contact_ctry_name":"St. Kitts and Nevis","contact_email":"Shaniqua.carey-brown@gov.kn","contact_name":"Ms. Shaniqua Carey-Brown","contact_organization":"Ministry of Public Infrastructure, Energy and Utilities","contact_phone_no":"1-869-467-1488","contact_web_url":"www.mopieudt.gov.kn","submission_date":"2026-10-01T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong><em>Saint Kitts and Nevis</em></strong></p><p><strong><em>Resilient Renewable Energy Infrastructure Investment Facility Project</em></strong></p><p>Loan No./Credit No./ Grant No.:_<u>GFPP Grant No. TF0C9072</u></p><p><strong>Assignment Title: </strong><u>Grid Modernization and Submarine Cable Interconnection Study</u></p><p><strong>Reference No</strong>. (as per Procurement Plan): <u>KN-MPIEU-528498-CS-CDS</u></p><p>&nbsp;</p><p>The Government of Saint Kitts and Nevis has received<em> </em>financing from the World Bank toward the cost of the Preparation Grant for the Caribbean Resilient Renewable Energy Infrastructure Investment Facility &ndash; SOP2, and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include a study that shall explicitly address the climate and disaster-risk vulnerabilities typical of Small Island Developing States (SIDS), including hurricane and cyclone resilience of grid and submarine cable infrastructure, seismic and volcanic hazard exposure characteristic of the Lesser Antilles, and regional energy-security cooperation.</p><p>&nbsp;</p><p>The assignment will be for a duration of 10 months and shall deliver a technically robust, investment-ready roadmap for modernizing the electrical grids of Saint Kitts and Nevis and interconnecting them via submarine cable, enabling full integration of renewable energy &mdash; including the proposed 30&ndash;50 MW geothermal plant, utility-scale solar PV, wind, and battery energy storage systems (BESS) &mdash; into a resilient, climate-responsive grid. Specific objectives include:</p><ul><li><strong>Grid Modernization: </strong>assess and redesign transmission and distribution infrastructure on both islands, including reconfiguration to a 69 kV ring topology, to reduce losses, improve reliability, and prepare the network for high renewable penetration.</li></ul><p>&nbsp;</p><ul><li><strong>Geothermal Integration: </strong>evaluate and specify transmission and substation requirements for delivering up to 50 MW of geothermal generation to both islands.</li></ul><p>&nbsp;</p><ul><li><strong>Submarine and Terrestrial Cable Interconnection: </strong>develop a technical, economically, and environmentally sound interconnection plan, including demonstrated technology and voltage selection, route selection, redundancy analysis, cable protection, terrestrial corridor works, and landing-point substation design.</li></ul><p>&nbsp;</p><ul><li><strong>Smart Grid and Digitalization: </strong>Design the SCADA architecture and associated Advanced Metering Infrastructure (AMI), Distributed Energy Resource Management Systems (DERMS), cybersecurity protocols, and integration pathways for electric vehicles (EV&rsquo;s and energy storage</li></ul><p>&nbsp;</p><ul><li><strong>Preliminary Environmental and Social Assessment: </strong>Prepare preliminary E&amp;S studies for the 1) submarine cable and terrestrial route survey design, and 2) transmission ring topology and substation design. Ensure full compliance with the World Bank Environmental and Social Framework (ESF), Environmental, Health and Safety Guidelines (EHSGs), and international technical standards (IEC, IEEE, ICPC).</li><li><strong>Risk and Climate Resilience: </strong>establish a risk management framework (register, quantification, escalation, contingency planning) and a climate vulnerability assessment covering extreme-weather and geohazard resilience.</li></ul><p>&nbsp;</p><ul><li><strong>Capacity Building: </strong>transfer technical knowledge to SKELEC, NEVLEC, and government agencies through structured training and documentation.[i]</li></ul><p>&nbsp;</p><p>The Terms of Reference (TOR) for the primary procurement stage for the assignment</p><p>are attached to this request for expressions of interest.</p><p>&nbsp;</p><p>The Ministry of Public Infrastructure et. al. now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><ul><li>The Consultant shall assemble a multidisciplinary team of international and local experts, each with a minimum of 10 years of relevant experience and a demonstrated track record on World Bank or comparable development-partner&ndash;funded projects in small island power systems (see TOR for composition of the team).</li><li>Key Experts will not be evaluated at the shortlisting stage.</li></ul><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; February 2025, setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment:</p><p>&nbsp;</p><p><strong>Unfair Competitive Advantage </strong></p><p>&nbsp;</p><p>3.17 &nbsp;&nbsp;&nbsp; Fairness and transparency in the selection process require that Consultants or their affiliates, competing for a Consulting assignment do not derive a competitive advantage from having provided Consulting Services related to it. To that end, the Borrower shall make available to all short-listed Consultants, together with the request for proposals document, all information that would give a Consultant a competitive advantage.&nbsp;</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Consultant Qualification Selection method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>This EOI can be found on the following websites:<br />&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; https://mopieudt.gov.kn/study</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; https://www.sknis@gov.kn &nbsp;</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours 0900 to 1600 hours.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail by <em>22nd October, 2026</em>.</p><p>&nbsp;</p><p><em>Ministry of Public Infrastructure, Energy and Utilities</em></p><p>Attn: <em>Shaniqua Carey-Brown</em></p><p><em>Rams Commercial Complex </em></p><p><em>Camps </em></p><p><em>St. Kitts</em></p><p>Tel: <em>1-869-467-1488</em></p><p>E-mail: <em>Shaniqua.carey-brown@gov.kn</em></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Grid Modernization and Submarine Cable Interconnection Study</strong></p><p><em>Federation of Saint Kitts and Nevis</em></p><p>Financed under the World Bank Caribbean Resilient Renewable Energy Infrastructure Investment Facility (RREIIF) and the Grant Facility for Project Preparation (GFPP)</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>1. Background and Context</strong>&nbsp;&nbsp;&nbsp; 1</p><p><strong>1.1 Country and Sector Context............................................................ 1</strong></p><p><strong>1.2 Policy Framework and Rationale.................................................... 1</strong></p><p><strong>1.3 SIDS Climate and Disaster-Risk Context......................................... 1</strong></p><p><strong>2. Objectives.............................................................................................. 1</strong></p><p><strong>2.1 Main Study Goals............................................................................. 1</strong></p><p><strong>2.2 Key Expected Outcomes.................................................................. 1</strong></p><p><strong>2.3 Intended Users and Stakeholders................................................... 1</strong></p><p><strong>3. Scope of Services................................................................................... 1</strong></p><p><strong>3.1 Grid Modernization &mdash; Saint Kitts and Nevis.................................. 1</strong></p><p><strong>3.2 Submarine Cable Interconnection.................................................. 1</strong></p><p><strong><em>3.2.1 Technology and Voltage Selection........................................... 1</em></strong></p><p><strong><em>3.2.2 Route Selection, Marine Survey and Geohazard Screening.... 1</em></strong></p><p><strong><em>3.2.3 Cable Design, Redundancy and Protection.............................. 1</em></strong></p><p><strong><em>3.2.4 Existing Infrastructure, Crossings and Third-Party Interests.. 1</em></strong></p><p><strong><em>3.2.5 Landing-Point Substations........................................................ 1</em></strong></p><p><strong>3.3 Terrestrial Cable and Transmission Works..................................... 1</strong></p><p><strong>3.4 Integration Readiness Analysis....................................................... 1</strong></p><p><strong>3.5 Preliminary Environmental and Social Impact Assessment.......... 1</strong></p><p><strong>3.6 Economic Analysis, Risk Management and Digital Tools............... 1</strong></p><p><strong>3.7 Independent Design Review (Owner&#39;s Engineer Function)........... 1</strong></p><p><strong>3.8 Procurement and Capacity Building............................................... 1</strong></p><p><strong>3.9 Implementation Readiness and Transition Planning..................... 1</strong></p><p><strong>4. Deliverables and Reporting.................................................................. 1</strong></p><p><strong>4.1 Deliverables Matrix......................................................................... 1</strong></p><p><strong>4.2 Reporting Format Requirements.................................................... 1</strong></p><p><strong>5. Team Composition and Expert Requirements..................................... 1</strong></p><p><strong>6. Project Timeline and Reporting Protocols........................................... 1</strong></p><p><strong>6.1 Timeline (10 Months)...................................................................... 1</strong></p><p><strong><em>Phase 1: Project Initiation (Months 1&ndash;2).......................................... 1</em></strong></p><p><strong><em>Phase 2: Assessment and Analysis (Months 3&ndash;5)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1</em></strong></p><p><strong><em>Phase 3: Detailed Studies and Design (Months 6&ndash;8)........................ 1</em></strong></p><p><strong><em>Phase 4: Finalization and Reporting (Months 9&ndash;10)........................ 1</em></strong></p><p><strong>6.2 Stage-Gated Reporting Protocol..................................................... 1</strong></p><p><strong>7. Budget and Payment Schedule............................................................. 1</strong></p><p><strong>Progress-Based Payment Structure...................................................... 1</strong></p><p><strong>Key Assumptions................................................................................... 1</strong></p><p><strong>8. Evaluation Criteria................................................................................ 1</strong></p><p><strong>9. Reference Standards and Appendices................................................. 1</strong></p><p><strong>9.1 World Bank and International Standards....................................... 1</strong></p><p><strong>9.2 Appendices and Supporting Documentation................................. 1</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>1. Background and Context</strong></p><p><strong>1.1 Country and Sector Context</strong></p><p>The Federation of Saint Kitts and Nevis operates two independent electrical systems: <strong>Saint Kitts (SKELEC)</strong>, with approximately 53 MW of installed generating capacity and 30 MW peak demand, and <strong>Nevis (NEVLEC)</strong>, with approximately 19.3 MW of installed capacity and 11.5 MW peak demand. Both systems experience high losses &mdash;&nbsp; approximately 8.85 % in St. Kitts and 8.8% in Nevis &mdash; and remain heavily dependent on diesel generation, resulting in elevated electricity costs, exposure to fuel-price volatility, and constrained capacity to absorb variable renewable energy.</p><p><strong>1.2 Policy Framework and Rationale</strong></p><p>Anchored in the Revised National Energy Policy and the Federation&#39;s Nationally Determined Contribution (NDC), the Government is committed to achieving <strong>100% renewable electricity generation by 2030</strong> and reducing economy-wide CO emissions by 61% relative to 2010 levels, drawing substantially on Nevis&#39;s geothermal potential together with utility-scale solar, wind, and battery energy storage.</p><p>Realizing these targets requires comprehensive grid modernization on both islands, a submarine cable interconnection linking the two systems, and integration of the proposed 30&ndash;50 MW Nevis geothermal plant. This assignment is financed under the World Bank&#39;s Caribbean Resilient Renewable Energy Infrastructure Investment Facility (RREIIF) and the Grant Facility for Project Preparation (GFPP), and builds on prior feasibility studies and Environmental and Social Impact Assessments (ESIAs) commissioned by SKELEC, NEVLEC, Ministry of Sustainability, and the Energy Unit, as well as regional frameworks such as the OECS Decade for Sustainable Energy and the CARICOM Energy Policy.</p><p><strong>1.3 SIDS Climate and Disaster-Risk Context</strong></p><p>The Study shall explicitly address the climate and disaster-risk vulnerabilities typical of Small Island Developing States (SIDS), including hurricane and cyclone resilience of grid and submarine cable infrastructure, seismic and volcanic hazard exposure characteristic of the Lesser Antilles, and regional energy-security cooperation.</p><p><strong>2. Objectives</strong></p><p><strong>2.1 Main Study Goals</strong></p><p>The assignment will deliver a technically robust, investment-ready roadmap for modernizing the electrical grids of Saint Kitts and Nevis and interconnecting them via submarine cable, enabling full integration of renewable energy &mdash; including the proposed 30&ndash;50 MW geothermal plant, utility-scale solar PV, wind, and battery energy storage systems (BESS) &mdash; into a resilient, climate-responsive grid. Specific objectives include:</p><ul><li><strong>Grid Modernization: </strong>assess and redesign transmission and distribution infrastructure on both islands, including reconfiguration to a 69 kV ring topology, to reduce losses, improve reliability, and prepare the network for high renewable penetration.</li><li><strong>Geothermal Integration: </strong>evaluate and specify transmission and substation requirements for delivering up to 50 MW of geothermal generation to both islands.</li><li><strong>Submarine and Terrestrial Cable Interconnection: </strong>develop a technical, economically, and environmentally sound interconnection plan, including demonstrated technology and voltage selection, route selection, redundancy analysis, cable protection, terrestrial corridor works, and landing-point substation design.</li><li><strong>Smart Grid and Digitalization</strong><strong>: </strong>Design the SCADA architecture and associated Advanced Metering Infrastructure (AMI), Distributed Energy Resource Management Systems (DERMS), cybersecurity protocols, and integration pathways for electric vehicles (EV&rsquo;s and energy storage</li><li><strong>Preliminary Environmental and Social Assessment: </strong>Prepare preliminary E&amp;S studies for the 1) submarine cable and terrestrial route survey design, and 2) transmission ring topology and substation design. Ensure full compliance with the World Bank Environmental and Social Framework (ESF), Environmental, Health and Safety Guidelines (EHSGs), and international technical standards (IEC, IEEE, ICPC).</li><li><strong>Risk and Climate Resilience: </strong>establish a risk management framework (register, quantification, escalation, contingency planning) and a climate vulnerability assessment covering extreme-weather and geohazard resilience.</li><li><strong>Capacity Building: </strong>transfer technical knowledge to SKELEC, NEVLEC, and government agencies through structured training and documentation.</li></ul><p><strong>2.2 Key Expected Outcomes</strong></p><ul><li><strong>Technical specifications of Tender Package: </strong>a complete suite of technical specifications of procurement packages for grid upgrades, geothermal integration, and interconnection works, including technical specifications, cost estimates, implementation phasing, risk allocation considerations, and documentation suitable for inclusion in tender and financing processes.</li></ul><p>&nbsp;</p><ul><li><strong>Detailed Technical Specifications: </strong>engineering design concepts and digital modernization strategies enabling efficient, secure dispatch of renewable energy at all scales, independently reviewed prior to procurement (see Section 3.7).</li><li><strong>Preliminary Environmental and Social Assessment: </strong>consistent with World Bank ESF and international best practices, including marine, terrestrial, and third party-infrastructure considerations.</li><li><strong>Stakeholder Engagement and Inclusion: </strong>consultation records, gender and vulnerability assessments, and a result-based monitoring and evaluation framework.</li><li><strong>Capacity Building and Knowledge Transfer: </strong>structured programs for local utilities and government agencies to ensure sustainability and technical self-reliance.</li></ul><p><strong>2.3 Intended Users and Stakeholders</strong></p><ul><li><strong>Government Ministries and Agencies: </strong>Ministry of Public Infrastructure, Energy and Utilities; the Energy Unit; Ministry of Finance; and Ministry of Environment and Transport, for policy development, budgeting, and regulatory oversight.</li><li><strong>State-Owned Utilities: </strong>SKELEC and NEVLEC, for technical implementation, grid operation, and asset management.</li><li><strong>Private Developers and Investors: </strong>geothermal, solar, wind, and Power-to-X developers requiring clear interconnection requirements and grid expansion plans to mobilize project finance.</li><li><strong>International Financing Partners: </strong>the World Bank and other multilateral development banks, requiring transparent, data-backed project documents that comply with fiduciary and safeguard standards.</li><li><strong>Local Communities and Civil Society: </strong>benefiting from inclusive consultation, improved energy services, disaster resilience, and employment opportunities.</li><li><strong>Additional Institutional Stakeholders (per prior study mapping): </strong>building on the stakeholder mapping conducted under the prior GCF-financed T&amp;D/EV study, the Development Control Planning Board, Department of Physical Planning (Nevis), Ministry of Sustainable Development (including the National Designated Authority), Eastern Caribbean Central Bank, St. Kitts and Nevis Chamber of Industry and Commerce, licensed vehicle importers, and Clarence Fitzroy Bryant College, among others, shall be consulted as relevant to grid modernization and EV-charging integration.</li></ul><p><strong>3. Scope of Services</strong></p><p>The scope is organized into clearly separated packages of work, consistent with international practice for terrestrial and subsea interconnector studies: desktop review, route/technology assessment, geophysical and geotechnical investigation, environmental and social screening, engineering design, cost estimation, procurement support, and implementation planning. The land-based (terrestrial) and marine (subsea) elements of the interconnection are treated as distinct workstreams throughout, reflecting their different technical inputs, approval pathways, and risk profiles.</p><p><strong>3.1 Grid Modernization &mdash; Saint Kitts and Nevis</strong></p><ul><li>Conduct a full audit of transmission and distribution assets on both islands &mdash; substations, feeders, transformers, and protection/control systems &mdash; including load-flow analysis, capacity-constraint identification, and power-quality/harmonic measurements.</li><li>Redesign the 11 kV networks from radial to loop/ring configuration, establishing a 69 kV ring on both St. Kitts and Nevis, with conductor sizing optimization and integration points for utility-scale solar, storage, and EV-charging infrastructure.</li><li>Design new primary substations and switching stations &mdash; 69/11 kV (St. Kitts) and 11/69 kV (Nevis) &mdash; for submarine cable interconnection, with SCADA and protection systems integrated with existing facilities.</li><li>Specify dedicated transmission lines, substation requirements, and conduct grid-stability/voltage-regulation studies for geothermal plant connection.</li><li>Conduct a grid-code gap analysis against Caribbean and World Bank standards and propose updated grid codes and performance standards (SAIDI, SAIFI, ENS) for renewable integration, including fault ride-through requirements.</li></ul><ul><li>Define power-system modelling software and scenarios, including N-1/N-2 contingency analysis, renewable-penetration cases, and minimum/maximum load conditions.</li><li><strong>&nbsp;Review and Build on Prior Assessment: </strong>incorporate and validate the findings of the prior T&amp;D Efficiency and Vulnerability Assessment (August 2025), including its recommended system upgrades (reactive compensation, advanced metering infrastructure, reconductoring of low-capacity feeders, SCADA and automated switching, and double-busbar 11 kV switchboard replacement), to avoid duplicating previously completed diagnostic work.</li></ul><p><strong>3.2 Submarine Cable Interconnection</strong></p><p>The following sub-sections set out the marine interconnection scope in the level of technical detail expected of a tender ready, internationally benchmarked TOR (consistent with practice on comparable World Bank-financed interconnectors, and close gaps identified through comparison against ICPC/CIGRE industry guidance.</p><p><strong><em>3.2.1 Technology and Voltage Selection</em></strong></p><p>The Consultant shall not assume the voltage level or transmission technology. Rather, the Consultant shall <strong>demonstrate, through a documented technical and economic comparison,</strong> the recommended choice of AC versus HVDC transmission and the associated voltage level for the &asymp; 15&ndash;20 km strait crossing, considering:</p><ul><li>Capital and lifecycle cost comparison between HVAC and HVDC options at candidate voltage levels;</li><li>Technical suitability given the crossing distance, load profile, and future expansion (including eventual OECS/CARICOM multi-country interoperability);</li><li>Reactive power compensation requirements and cable charging-current constraints for the AC case;</li><li>Converter station footprint, cost, and maintenance implications for the HVDC case;</li><li>A reasoned recommendation, with the basis for the recommendation presented transparently for review by the Client, World Bank, and independent design reviewer (Section 3.7).</li></ul><p><strong><em>3.2.2 Route Selection, Marine Survey and Geohazard Screening</em></strong></p><p>Conduct marine geotechnical and bathymetric surveys of three candidate routes:</p><ul><li><ul><li>Route 1: Charlestown&ndash;Basseterre;</li><li>Route 2: Cades Bay&ndash;Frigate Bay;</li><li>Route 3: Cades Bay&ndash;Majors Bay;</li></ul></li></ul><p>including shore-approach and beach-profile assessments and landing-point selection. Survey and screening work shall follow a staged approach &mdash; desktop screening, geophysical survey, then geotechnical confirmation &mdash; and shall meet the following minimum requirements so that competing bids are technically comparable:</p><ul><li><strong>Geophysical survey toolset: </strong>multibeam echosounder (bathymetry), side-scan sonar (seabed features/obstacles), sub-bottom profiler (sub-surface stratigraphy), and magnetometer (ferrous object/UXO screening), with a stated corridor width and survey resolution for each candidate route.</li><li><strong>Geotechnical investigation: </strong>vibro-core or piston-core sampling (and cone penetration testing (CPT) where warranted) along the shortlisted route at intervals sufficient to characterize burial conditions, with a defined laboratory and in-situ testing regime to guide burial depth, trenching/ploughing method, and tooling selection.</li><li><strong>Geohazard screening: </strong>explicit assessment of slope stability, seismicity, and sediment mobility/scour along the route corridor, reflecting the volcanic setting and steep nearshore bathymetry of the Narrows/Nevis Channel. This shall be a distinct deliverable and shall not be treated as implicitly covered by the bathymetric survey.</li></ul><p><strong><em>3.2.3 Cable Design, Redundancy and Protection</em></strong></p><ul><li>Perform combined system modelling of St. Kitts and Nevis &mdash; power-transfer scenarios, dynamic stability, short-circuit analysis, and protection coordination for interconnected operation.</li><li>Specify detailed technical requirements for the submarine cable, including installation/burial depth, minimum bend radius, tension limits, conductor type and rating, fiber-optic integration, reactive compensation requirements (as applicable), spare-cable provision, and repair/recovery strategy.</li></ul><p><strong>Cable security and physical protection: </strong>the design basis shall address anchor-strike and third party-interference (including deliberate sabotage) risk mitigation, including burial depth as a protective measure, declaration of a cable protection zone, and provisions for route monitoring, consistent with the resilience objectives of the Study.</p><p><strong><em>3.2.4 Existing Infrastructure, Crossings and Third-Party Interests</em></strong></p><p>The Consultant shall carry out a survey of existing seabed and nearshore infrastructure and third-party interests along candidate routes, including:</p><ul><li>Existing telecommunications cables and other subsea infrastructure, with proposed crossing methodology and draft crossing-agreement provisions consistent with ICPC-recommended practice;</li><li>Vessel anchorages, designated anchoring areas, and shipping lanes;</li><li>Marine protected areas and other designated or proposed conservation zones.</li></ul><p><strong><em>3.2.5 Landing-Point Substations</em></strong></p><p>Design a transmission ring topology linking major load centres and planned power-plant sites, with landing-point substations (St. Kitts: 69/11 kV; Nevis: 11/69 kV) featuring switching, control/protection, and SCADA integration. Prepare capital cost estimates, financial analysis (NPV, IRR, sensitivity), and a procurement strategy with technical specifications.</p><ul><li><strong>Reference Prior Interconnection Analysis: </strong>review and update, as appropriate, the prior study&rsquo;s preliminary 33 kV express-feeder interconnection concept between Needsmust Power Station (St. Kitts) and Prospect Power Station (Nevis), including its indicative capital cost range (USD 3.0&ndash;5.1 million) and estimated fuel-displacement benefit (approximately 1.03 million litres/year), when evaluating and selecting the recommended voltage level and route for the submarine cable interconnection.</li></ul><p><strong>3.3 Terrestrial Cable and Transmission Works</strong></p><p>The terrestrial component of the interconnection extends beyond the substation-to-landing-point interface and shall be scoped explicitly, covering:</p><ul><li>Corridor mapping and route assessment for terrestrial cable and overhead transmission segments, including constructability constraints;</li><li>Design standards for terrestrial segments, and applicable undergrounding/duct-bank standards for cable sections;</li><li>Right-of-way and wayleave/easement identification and acquisition support, including engagement with private landowners and public authorities along the terrestrial corridor;</li><li>Utility and infrastructure crossings (roads, drainage, other utilities) and associated permitting requirements;</li><li>Trenching, ducting, and civil works specifications for terrestrial cable sections, including reinstatement requirements.</li></ul><p><strong>3.4 Integration Readiness Analysis</strong></p><ul><li>Assess system capacity to absorb solar PV, wind, BESS, electric vehicles (EVs), and Power-to-X projects.</li><li>Develop interconnection standards and operational protocols for hydrogen production and broader sector coupling.</li><li>Analyze regional expansion options for future multi-country interoperability with neighbouring OECS/CARICOM grids.</li><li><strong>Align with EV Transition Policy and Prior EV Roadmap: </strong>ensure EV integration standards and charging-infrastructure provisions are consistent with the St. Kitts and Nevis EV Transition Policy (2024&ndash;2033) and build upon, rather than duplicate, the phased short/medium/long-term targets, financial incentives, and charging-infrastructure recommendations of the prior EV Integration Roadmap.</li></ul><p><strong>3.5 Preliminary Environmental and Social Impact Assessment</strong></p><p>Given the available budget under the Preparation Grant (Section 7), this activity is scoped as a preliminary, scoping-level ESIA rather than a full ESIA. Its purpose is to screen environmental and social risks, identify data gaps, and establish an ESMP framework sufficient to inform Project design and the subproject pipeline. A full ESIA meeting Environmental and Social Standards (ESS) requirements, including detailed field-based marine surveys where warranted, shall be completed under the Follow-on Legal Agreement once the Project scope and financing are confirmed. The Consultant shall clearly flag, within the Inception Report, which of the activities below are deliverable at preliminary/desk-based level within this budget, and which would require additional field survey budget to complete to full-ESIA standard.</p><ul><li>Undertake field-based marine ecosystem mapping and biodiversity assessment (fish, sea turtles, marine mammals), explicitly integrating climate-change stressors and assessing construction- and operational-phase impacts &mdash; including underwater noise, sedimentation, and water quality &mdash; with corresponding mitigation and monitoring measures.</li><li>Assess electromagnetic field (EMF) effects of the submarine cable on EMF-sensitive species (e.g. rays, sharks, sea turtles) as a distinct line item in the ESIA, consistent with recognized practice for international offshore cable ESIAs.</li><li>Incorporate the findings of the crossing/third party-infrastructure survey (Section 3.2.4) into the ESIA and ESMP, including mitigation measures and crossing-agreement provisions.</li><li>Conduct terrestrial and substation-site assessments &mdash; visual impact, soil/groundwater quality, and vegetation/wildlife habitat &mdash; along with a beach-profile assessment of the cable corridors.</li><li>Design and implement a stakeholder engagement program &mdash; public workshops, focus groups, and bilateral meetings with fishermen, tourism operators, communities, and government &mdash; ensuring project data is shared proactively with stakeholders and that community-facing engagement materials incorporate input from the Constituency Empowerment Unit.</li><li>Carry out socio-economic analysis of effects on fishing and tourism, local employment, and community access/navigation, with a Gender Analysis and cumulative-impact and ecosystem-services valuation and prepare an Environmental and Social Management Plan (ESMP) with mitigation hierarchy, monitoring indicators with targets and budgets, quarterly reporting, and a grievance redress mechanism.</li></ul><p><strong>3.6 Economic Analysis, Risk Management and Digital Tools</strong></p><ul><li>Conduct economic and financial analysis for each project component and the project overall &mdash; cost-benefit analysis of alternative technical solutions (including the AC/HVDC comparison in Section 3.2.1), 25&ndash;30-year financial modelling, ERR/NPV/IRR, tariff-impact scenarios, and an assessment of climate/concessional finance options available for SIDS.</li><li>Establish a project risk register (technical, financial, environmental, social, institutional) with mitigation strategies, contingency plans specific to submarine cables, geothermal integration, and local supply chain, and escalation protocols.</li><li>Apply GIS-based planning with georeferenced data for all infrastructure components and, where feasible, a digital twin of the grid and interconnection for scenario analysis and operator training.</li></ul><p><strong>3.7 Independent Design Review (Owner&#39;s Engineer Function)</strong></p><p>Prior to finalization of procurement specifications for the submarine cable and associated works, the technical design shall undergo an independent design review by a qualified party separate from the core design team, consistent with practice on comparable World Bank-financed interconnectors. The independent review shall cover:</p><ul><li>Verification of the technology/voltage selection basis and supporting economic analysis (Section 3.2.1);</li><li>Verification of route, survey, and geohazard findings and their translation into the design basis;</li><li>Review of redundancy, protection, and cable-security provisions;</li><li>Review of cost estimates and procurement packaging strategy for reasonableness and completeness.</li></ul><p>The Consultant shall budget for and coordinate this review, incorporate review findings prior to submission of final procurement documents, and document the resolution of any review comments.</p><p><strong>3.8 Procurement and Capacity Building</strong></p><ul><li>Undertake market sounding for submarine cable supply and installation logistics and prepare a packaging strategy for turnkey or split contracts &mdash; with risk allocation and local-content requirements &mdash; plus procurement templates and technical specifications aligned with World Bank Standard Bidding Documents.</li><li>Incorporate technology-transfer objectives and training requirements into contract specifications and establish anti-corruption safeguards and complaint-handling protocols.</li><li>Develop a capacity-building plan, train-the-trainer program, and a digital documentation repository for SKELEC, NEVLEC, and relevant government agencies, and facilitate regional knowledge-sharing (e.g. CARILEC, CCREEE).</li><li><strong>Build on Existing EV Training Program: </strong>coordinate the capacity-building plan and train-the-trainer program with the existing EV Integration Training Program (led by TT PV Solar Ltd., targeting certification of 20 technicians by 2033), extending it to cover grid-modernization and interconnection-specific skills rather than duplicating the existing curriculum.</li></ul><p><strong>3.9 Implementation Readiness and Transition Planning</strong></p><ul><li>Develop a phased implementation roadmap and a detailed first-year action plan.</li><li>Design an institutional strengthening and transition plan, including staff recruitment, training, and organizational changes needed to operate the modernized/interconnected grid.</li><li>Identify and prepare for pre-investment activities &mdash; surveys, permits, and procurement actions &mdash; required to move directly into implementation.</li><li><strong>Support Recommended Institutional Reforms: </strong>as part of the transition plan, support the Client in advancing the institutional reforms identified in the prior study &mdash; establishment of a Public Utilities Commission for unified regulatory oversight, formation of an Electric Vehicle Council, and instituting a Grid Modernization Cross-Functional Task Force &mdash; and align the phased implementation roadmap with these bodies&rsquo; mandates.</li></ul><p><strong>4. Deliverables and Reporting</strong></p><p>All reports shall be submitted in digital and hard-copy formats using World Bank reporting templates, and shall include executive summaries, technical annexes, and GIS data files where applicable. Each deliverable is subject to Client review and, where required, World Bank no-objection, prior to acceptance.</p><p><strong>4.1 Deliverables Matrix</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:637px\"><thead><tr><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:172px\"><p><strong>Workstream</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:278px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:100px\"><p><strong>Due (Month)</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:87px\"><p><strong>Format</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Grid Modernization</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Inception Report (methodology, risk register, work plan)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report + PPT</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Grid Modernization</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Grid Assessment Report (both islands)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M2</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Grid Modernization</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Preliminary Design Report (incl. SCADA/control concepts)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Grid Modernization</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Detailed Design Report and specifications</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M5</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report + drawings</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Grid Modernization</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Implementation Plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Geothermal Integration</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Geothermal Integration Feasibility Report (transmission &amp; substation concepts)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M5</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Technology/Voltage Selection Memorandum (Sec. 3.2.1)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Memo</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Marine Survey, Geohazard and Route Alternatives Report (Sec. 3.2.2)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M7</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report + GIS</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Technical Design Report (cable, redundancy, protection, substations)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Crossing / Third-Party Infrastructure Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M5</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Independent Design Review Report and Response (Sec. 3.7)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Economic Feasibility Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M9</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Submarine Interconnection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Procurement Specifications</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Bid documents</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Terrestrial Works</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Terrestrial Corridor and Wayleave/Easement Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M6</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report + GIS</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Environmental &amp; Social</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Scoping Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Environmental &amp; Social</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Baseline Studies Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M5</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Environmental &amp; Social</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Impact Assessment Report (incl. EMF assessment)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Environmental &amp; Social</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Environmental and Social Management Plan (ESMP)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M9</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Environmental &amp; Social</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Final ESIA Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Stakeholder Engagement Records and summary of consultations</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M8</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Capacity-Building Plan and training materials</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Presentation Materials &mdash; executive slide decks for government, World Bank, and community outreach</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M1, M6, M 9&ndash;M10</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>PPT / brochures</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Implementation Readiness and Transition Plan (first-year action plan)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Results Framework and Monitoring Dashboards (SMART indicators)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M9</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report + dashboard</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:172px\"><p>Project-Wide</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:278px\"><p>Final Report, Results Framework, and Knowledge-Transfer Package</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p>M10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:87px\"><p>Report</p></td></tr></tbody></table><p><strong>4.2 Reporting Format Requirements</strong></p><ul><li>All deliverables shall include an executive summary, main technical body, and technical annexes.</li><li>GIS shapefiles and georeferenced data shall accompany all routes, survey, and infrastructure-siting deliverables.</li><li>Reports shall undergo internal quality review by the Consultant prior to submission.</li><li>Acceptance criteria for each deliverable shall be agreed with the Client at the Inception stage and referenced against this Deliverables Matrix.</li></ul><p><strong>5. Team Composition and Expert Requirements</strong></p><p>The Consultant shall assemble a multidisciplinary team of international and local experts, each with a minimum of 10 years of relevant experience and a demonstrated track record on World Bank or comparable development-partner&ndash;funded projects in small island power systems.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:579px\"><thead><tr><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; width:252px\"><p><strong>Role</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; width:327px\"><p><strong>Key Requirements</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:59px; width:252px\"><p>Project Manager / Team Leader</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:59px; width:327px\"><p>15+ yrs power systems &amp; submarine cable projects; PE certification; Caribbean experience preferred</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; width:252px\"><p>Senior Power Systems Engineer</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; width:327px\"><p>Grid planning/design, load-flow and stability analysis, renewable integration</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:59px; width:252px\"><p>Transmission &amp; Interconnection Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:59px; width:327px\"><p>Submarine/terrestrial transmission design, voltage selection, redundancy modelling</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:59px; width:252px\"><p>Submarine Cable Specialist</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:59px; width:327px\"><p>HVAC/HVDC submarine cable design, marine installation, route selection, geohazard interpretation</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; width:252px\"><p>Substation Design Engineer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; width:327px\"><p>HV/MV substation design, protection &amp; control, SCADA automation</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; width:252px\"><p>Senior Environmental &amp; Social Safeguards Specialist</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; width:327px\"><p>ESIA/ESMP, World Bank ESF, climate adaptation</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:59px; width:252px\"><p>Marine Biologist / Ecologist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:59px; width:327px\"><p>Caribbean marine ecosystems, coral/seagrass, fish &amp; marine-mammal assessment, EMF-sensitive species</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; width:252px\"><p>Social Development Specialist</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; width:327px\"><p>Stakeholder engagement, gender &amp; vulnerability analysis</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:59px; width:252px\"><p>Economic / Financial Analyst</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:59px; width:327px\"><p>Cost-benefit analysis, financial modelling, AC/HVDC economic comparison</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; width:252px\"><p>Procurement Specialist</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; width:327px\"><p>World Bank Standard Bidding Documents</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; width:252px\"><p>GIS / Remote Sensing Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; width:327px\"><p>Survey mapping, siting analysis</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; width:252px\"><p>Legal / Regulatory Specialist</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; width:327px\"><p>Permitting, wayleave/easement, and regulatory compliance</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:252px\"><p>Health and Safety Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:327px\"><p>H&amp;S protocols for field activities</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; width:252px\"><p>Local Engineering / Environmental Liaison</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; width:327px\"><p>Local firm partnership, community liaison, permitting support</p></td></tr></tbody></table><p><strong>6. Project Timeline and Reporting Protocols</strong></p><p><strong>6.1 Timeline (10 Months)</strong></p><p><strong><em>Phase 1: Project Initiation (Months 1&ndash;2)</em></strong></p><p>Team mobilization, inception report and presentation, stakeholder mapping and initial consultations, data collection and baseline establishment, and marine-survey mobilization.</p><p><strong><em>Phase 2: Assessment and Analysis (Months 3&ndash;5)</em></strong></p><p>Grid infrastructure assessments for both islands, technology/voltage selection analysis, marine surveys and route/geohazard investigations, environmental and social baseline studies, preliminary technical designs, and initial stakeholder consultation workshops.</p><p><strong><em>Phase 3: Detailed Studies and Design (Months 6&ndash;8)</em></strong></p><p>Detailed engineering designs for all project components (including redundancy, protection, and crossing provisions), independent design review, impact assessments and mitigation/monitoring planning, economic and financial analysis, advanced stakeholder consultations, and draft report preparation.</p><p><strong><em>Phase 4: Finalization and Reporting (Months 9&ndash;10)</em></strong></p><p>Final reports, incorporation of independent review and stakeholder feedback, final presentation and handover, and capacity-building workshops.</p><p><strong>6.2 Stage-Gated Reporting Protocol</strong></p><ul><li><strong>Inception Presentation (Month 1): </strong>methodology, team mobilization, and risk-matrix review.</li><li><strong>Technology/Voltage Selection Review (Month 4): </strong>presentation of the AC/HVDC comparison and recommended basis of design.</li><li><strong>Interim Presentations (Months 4 and 8): </strong>technical progress updates, key findings, and stakeholder-feedback synthesis.</li><li><strong>Independent Design Review Checkpoint (Month 7): </strong>presentation of independent review findings and resolution plan.</li><li><strong>Draft Final Presentation (Month 9): </strong>summary of technical, financial, and ESIA results for validation.</li><li><strong>Final Presentation (Month 10): </strong>delivery of all outputs, knowledge transfer, and implementation roadmap.</li></ul><p>All reports and presentations must follow World Bank reporting templates, include executive summaries, technical annexes, and GIS shapefiles, be submitted in digital and hard-copy formats, and incorporate stakeholder feedback prior to finalization. Reports shall undergo internal quality review before submission.</p><p><strong>7. Budget and Payment Schedule</strong></p><p>Total available budget for the technical study: USD 450,000. This reflects the USD 500,000 GFPP/RREIIF preparation grant (TF0C9072), less USD 50,000 reserved by the Client for project management and other Client-side activities (e.g., PIU/Activities Coordinator support, independent audit, and administrative costs) under the Grant Agreement. The allocation below is indicative; firms&#39; technical and financial proposals will provide the basis for final negotiation and, if needed, scaling back of specific activities to remain within the available budget.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:544px\"><thead><tr><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:371px\"><p><strong>Activity</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:173px\"><p><strong>Estimated Cost (USD)</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>1. Grid Modernization Study</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>195,000</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>2. Submarine and Terrestrial Cable Interconnection Study (incl. route analysis, geohazard screening, redundancy analysis, economics, procurement specs)</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>150,000</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>3. Preliminary Environmental &amp; Social Impact Assessment (desk-based and scoping-level marine and terrestrial studies, EMF screening, social screening, stakeholder engagement, and ESMP framework; full ESIA to be completed under the Follow-on Legal Agreement)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>90,000</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>4. Independent Design Review</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>15,000</p></td></tr><tr><td style=\"background-color:#deeaf6; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p><strong>Total</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p><strong>450,000</strong></p></td></tr></tbody></table><p><strong>Progress-Based Payment Structure</strong></p><p>Disbursements shall be milestone-based, subject to formal acceptance of deliverables by the Client and, where required, World Bank no-objection, in accordance with World Bank fiduciary and anti-corruption provisions. Funds shall be allocated through a project-specific, auditable account, with payments linked to deliverable acceptance as follows:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:544px\"><thead><tr><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:371px\"><p><strong>Milestone</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:173px\"><p><strong>Payment</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Mobilization Advance (upon contract signing and inception)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Acceptance of Inception Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>15%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Technical Assessment and Modernization Options Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>15%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Geothermal Integration Feasibility Report</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Interconnection Design, Redundancy Analysis and Transmission Planning Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Independent Design Review Sign-off</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>5%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Provisional Acceptance of ESIA and ESMP</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Procurement and Financial Planning Documents</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Final Report and Knowledge-Transfer Deliverables</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>10%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:371px\"><p>Completion of Dissemination and Closure Activities</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:173px\"><p>5%</p></td></tr></tbody></table><p><em>Each payment is contingent upon formal acceptance of deliverables and incorporation of required revisions at no additional cost; all invoices must include supporting documentation and comply with World Bank audit requirements.</em></p><p><strong>Key Assumptions</strong></p><ul><li>Expert costs represent approximately 70% of the total budget (&asymp; USD 315,000).</li><li>The remaining 30% covers travel, surveys, equipment, the independent design review, overheads, and profit.</li><li>Total effort: approximately 90 person-months across all experts, consistent with Section 6.</li><li>Cost variations by seniority: Senior (+30%), Mid (baseline), Junior (&ndash;30%).</li></ul><p><strong>8. Evaluation Criteria</strong></p><p>Proposals shall be evaluated against the following weighted criteria. Indicative weightings are provided; final weightings shall be confirmed in the Request for Proposals in accordance with World Bank procurement guidelines.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:571px\"><thead><tr><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:213px\"><p><strong>Criterion</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:277px\"><p><strong>Description</strong></p></td><td style=\"background-color:#1f3864; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:80px\"><p><strong>Weight</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:213px\"><p>Technical Methodology</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:277px\"><p>Quality, clarity, and technical soundness of the proposed approach to the technology/voltage selection, route and geohazard investigation, redundancy analysis, and ESIA scope</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:80px\"><p>30%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:213px\"><p>Team Qualifications</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:277px\"><p>Relevant qualifications and seniority of proposed experts against Section 5 requirements</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:80px\"><p>25%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:213px\"><p>Relevant Cable Experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:277px\"><p>Demonstrated firm and key-expert experience on comparable submarine/terrestrial interconnector projects, including marine survey, cable design, and independent review assignments</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:80px\"><p>25%</p></td></tr><tr><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:213px\"><p>Work Plan and Schedule</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:277px\"><p>Realism and coherence of the proposed work plan against the Section 6 timeline and Section 4 deliverables matrix</p></td><td style=\"background-color:#f2f6fb; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:80px\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:213px\"><p>Local Presence / Partnership</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:277px\"><p>Extent of local firm partnership and capacity-building approach</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:80px\"><p>10%</p></td></tr></tbody></table><p><strong>9. Reference Standards and Appendices</strong></p><p><strong>9.1 World Bank and International Standards</strong></p><p>All deliverables shall comply with the World Bank Environmental and Social Framework (ESF), including applicable Environmental and Social Standards (ESS1&ndash;ESS10), and the World Bank Group Environmental, Health, and Safety Guidelines (EHSGs) for power transmission/distribution, renewable energy infrastructure, and construction/marine works.</p><p>Technical design and engineering studies shall reference the latest editions of IEC and IEEE standards for power systems, grid modernization, and protection; ICPC guidelines for subsea cable route selection, installation, environmental management, and crossing agreements; CIGRE guidance for submarine cable systems; and CDB/CARICOM regional standards &mdash; together with the Caribbean Regional Energy Efficiency Building Code (CREEBC) proposed under the prior GCF-financed study for climate-resilient and energy-efficient design of substations and associated facilities, -&mdash; all consistent with Saint Kitts and Nevis national legislation and regulatory codes. Reports shall follow World Bank reporting templates and undergo internal quality review prior to submission.</p><p><strong>9.2 Appendices and Supporting Documentation</strong></p><ul><li>Project roadmaps and implementation schedules referenced or developed during the assignment.</li><li>Technical maps, network diagrams, and GIS shapefiles for survey, routing, and infrastructure siting.</li><li>A glossary of technical abbreviations and institutional acronyms used across all deliverables.</li><li>Bibliographic citations of all source documents, datasets, laws, licenses, studies, and sector plans utilized or referenced, with links to public or World Bank repositories wherever possible.</li><li>Copies of permits, licenses, and regulatory approvals required for project implementation, including terrestrial wayleave/easement documentation and marine crossing agreements.</li><li>Any additional supporting documentation required for international financing and compliance reviews.</li><li><strong>Prior Study Deliverables: </strong>the seven deliverables of the closed-out GCF-financed T&amp;D/EV study (T&amp;D Efficiency and Vulnerability Assessment, Grid and Tariff Barrier Assessment, Building Codes Update, Validation Workshop record, EV Integration Roadmap, EV Integration Training Program, and stakeholder consultation records) shall be provided to the Consultant as reference background documentation at inception.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00471089","notice_type":"Request for Expression of Interest","noticedate":"24-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-09T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Liberia","project_id":"P172012","project_name":"Liberia Sustainable Management of Fisheries Project","bid_reference_no":"LR-NAFAA-573142-CS-CQS","bid_description":"Consulting services for the supervision of the ongoing Reconstruction of Klay Hatchery and Supervision of Construction of the commercial fish feed mill at Klay Hatchery in Bomi County","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"United Nations Drive\nBushrod Island\nMontserrado\n1000-10","contact_ctry_name":"Liberia","contact_email":"adioh@nafaa.gov.lr","contact_name":"Abraham W. Dioh","contact_organization":"National Fisheries and Aquaculture Authority","contact_phone_no":"0886567543","contact_web_url":"http://www.nafaa.gov.lr","submission_date":"2026-09-24T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSION INTEREST</strong></p><p><strong>(CONSULTING SERVICES)</strong></p><p><strong>Preparation Advance No. IDA V3100</strong></p><p><strong>PROJECT ID: P172012</strong></p><p><strong>Subject: Request for Expression of Interest (REOI) for </strong><strong>Consulting Services for the Supervision of Ongoing Reconstruction of the Klay Hatchery and Supervision of Construction of the Commercial Fish Feed Mill at Klay Hatchery.</strong></p><p><strong>Reference No.: LR-NAFAA-573142-CS-CQS</strong></p><p><strong>Assignment Title: </strong><strong>Consulting Services for the Supervision of Ongoing Reconstruction of the Klay Hatchery and Supervision of Construction of the Commercial Fish feed Mill at Klay Hatchery. </strong></p><ol><li><strong>BACKGROUND</strong></li></ol><p>The Government of Liberia, through the National Fisheries &amp; Aquaculture Authority (NaFAA), is implementing the Liberia Sustainable Management of Fisheries Project (LSMFP) with financing from the World Bank. The project aims to strengthen fisheries management, expand aquaculture production, and improve livelihoods in targeted fishing communities.</p><p>Under Component 3, NaFAA is rehabilitating the Klay Hatchery and constructing a Commercial Fish Feed Mill. To ensure effective delivery of both investments, NaFAA seeks a qualified consulting firm to supervise the ongoing hatchery reconstruction and the construction, installation, testing, and commissioning of the feed mill and solar system. The assignment duration is five (5) months.</p><p><strong>2.0 OBJECTIVES OF THE ASSIGNMENT&nbsp; </strong></p><p>The overall objective is to engage a qualified engineering consulting firm to provide effective, independent and technically rigorous supervision of the Klay Hatchery reconstruction works and the construction, installation and commissioning of the Commercial Fish Feed Mill at Klay Hatchery.</p><p>The specific objectives are to:</p><ol><li><strong>Supervise and monitor</strong> the reconstruction of the Klay Hatchery and construction of the Commercial Fish Feed Mill to ensure compliance with approved designs, specifications, contract conditions, and work programs.</li><li><strong>Verify the quality of works, materials, equipment, and installations</strong>, ensuring that all construction and feed mill systems meet the required technical and operational standards.</li><li><strong>Coordinate civil, structural, mechanical, electrical, and process-related works</strong> to ensure effective integration of hatchery and feed mill facilities.</li><li><strong>Monitor project progress, costs, and contractual performance</strong>, and provide timely advice on corrective actions to address delays, variations, or implementation challenges.</li><li><strong>Ensure compliance with environmental, social, occupational health and safety requirements</strong>, and applicable national and project-specific safeguards.</li><li><strong>Oversee testing, commissioning, performance verification, and defect rectification</strong> to ensure the feed mill, hatchery facilities and solar system are fully operational and meet intended performance targets.</li><li><strong>Support contract administration, certification, reporting, and handover processes</strong>, including maintaining accurate records and preparing completion and final account documentation.</li></ol><p><strong>3.0 SCOPE OF SERVICES</strong></p><p>The overall scope of services will include, but will not be limited to:</p><ol><li>Supervising construction works for the Klay Hatchery and Fish Feed Mill.</li><li>Ensuring compliance with approved designs, specifications, contract conditions, and work schedules.</li><li>Monitoring quality, cost, progress, environmental and social compliance, and occupational health and safety.</li><li>Coordinating civil, structural, mechanical, electrical, and process-related works.</li><li>Overseeing testing, commissioning, completion, and handover activities.</li><li>Maintaining accurate project records and support contract administration</li></ol><p>The National Fisheries and Aquaculture Authority (NaFAA) now invites eligible consulting firms to indicate their interest in performing the Services. Interested firms must provide information indicating that they are qualified to perform the services (brief corporate profile: technical and managerial capability of the firm, description of similar assignments, experience in similar conditions, availability of appropriate skills and staff, etc.)</p><p>The shortlisting criteria includes the following qualifications:</p><p><strong>4.0 CONSULTANT QUALIFICATIONS </strong></p><p>Interested firms should:</p><ol><li>Have at least 10 years of experience in construction supervision or engineering consultancy.&nbsp;</li><li>Preferably possess at least 15 years of relevant experience in aquaculture, hatcheries, industrial processing facilities, feed mills, or similar infrastructure projects. To demonstrate required competence and adequacy to successfully complete the assignment, the firm must have specific in-depth and recent experience in at least two similar assignments in the last 15 years.</li><li>Demonstrate experience with donor-funded projects and supervision of industrial equipment installation and commissioning.</li><li>The firm will assemble a multi-disciplinary team of technicians which must include the key experts as stated below, though the consultant may propose additional expertise as required as non-key experts; however, their qualifications will not be considered in the evaluation of proposal. The proposed key staff listed below will not be evaluated at this stage:</li></ol><p>Project Manager / Senior Structural Engineer, Civil Engineer, Mechanical / Feed Mill Process Engineer, Electrical Engineer/, Quality Control Engineer, Geodetic Survey Engineer, Environmental Officer, Health &amp; Safety Officer, Social &amp; Gender Officer, Clerk of Works/ Site Inspectors</p><p>The detailed Terms of Reference (TOR) for the assignment can be found at <strong>www.nafaa.gov.lr</strong><u><strong> </strong></u><u>and</u><u><strong> </strong></u><strong>https://nafaa.gov.lr/projects/lsmmfp</strong></p><p>The attention of interested individual Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised November 2017, August 2018, November 2020, and September 2023 setting forth the World Bank&rsquo;s policy on conflict of interest. Please refer to paragraph 3.17 of the Procurement Regulations on conflict of interest related to this assignment which is available on the Bank&rsquo;s website at http://projectsbeta.worldbank.org/en/projects-operations/products-and- services/brief/procurement-newframework .</p><p><strong>5.0 SUBMISSION OF EXPRESSIONS OF INTEREST</strong></p><p>Expressions of Interest must be submitted no later than <strong>Friday, October 9, 2026, at 4:00 PM GMT</strong> to the Liberia Sustainable Management of Fisheries Project (LSMFP), National Fisheries &amp; Aquaculture Authority, Monrovia, Liberia.</p><p>Further information can be obtained at the address below during office hours, i.e., 0900 to 1600 hours GMT.</p><p><strong>Liberia Sustainable Management of Fisheries Project (LSMFP)</strong></p><p><strong>Attn: The Project Coordinator</strong></p><p><strong>Mesurado Pier, Freeport of Monrovia </strong></p><p><strong>Monrovia, Liberia </strong></p><p><strong>Tel: +231(0)886-532 901 / 0770-538 462</strong></p><ol><li><strong>mail: </strong><strong>adioh@nafaa.gov.lr</strong> <strong>with copy to rgbatoe@nafaa.gov.lr, jkpelewah@nafaa.gov.lr, </strong><strong>aboimah-porte@nafaa.gov.lr</strong><strong> </strong><strong>&nbsp;and </strong><strong>ndassin@nafaa.gov.lr</strong><strong> </strong></li></ol><p><strong>6.0 SELECTION METHOD</strong></p><p>The Consultant will be selected in accordance with the Consultant Qualifications Selection (CQS) method set out in the World Bank Procurement Regulations for IPF Borrowers.</p><p><strong>7.0 RECOMMENDED LENGTH OF EOI</strong></p><p>The maximum recommended length of your Expression of Interest is <strong><u>ten (10) pages</u></strong>.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00469758","notice_type":"Request for Expression of Interest","noticedate":"23-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-12T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Caribbean","project_id":"P179519","project_name":"Caribbean Efficient and Green-Energy Buildings Project (CEGEB)","bid_reference_no":"LC-OECS COMMISSION-554122-CS-QCBS","bid_description":"Investment-grade Audits and Detailed Design of Energy Efficiency Measurements (EEM) and Distributed Photovoltaic (DPV) Systems in Public Buildings and Facilities in Grenada, Saint Lucia, and Guyana.","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"P.O. Box 179 \nMorne Fortune \nCastries \nSaint Lucia","contact_ctry_name":"St. Lucia","contact_email":"procurementbids@oecs.int","contact_name":"Shanna Emmanuel","contact_organization":"Organization of Eastern Caribbean States Commission","contact_phone_no":"17584556418","contact_web_url":"https://www.oecs.int/en/work-with-us/procurements/current-tenders","submission_date":"2026-09-23T00:00:00Z","notice_text":"<p><strong><u>REQUEST FOR EXPRESSIONS OF INTEREST</u></strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Organisation of the Eastern Caribbean States Commission (OECSC)</strong></p><p><strong>Caribbean Efficient and Green-Energy Buildings Project</strong></p><p><strong>Grant No.: </strong>IDA-E4140<strong> </strong></p><p><strong>Assignment Title: </strong>Investment-grade audits and detailed design of Energy Efficiency Measures (EEM) and Distributed Photovoltaic (DPV) systems in Public Buildings and Facilities in Grenada, Saint Lucia and Guyana.</p><p><strong>Reference No.: </strong>LC-OECS COMMISSION-554122-CS-QCBS</p><p><strong>Participating Countries: </strong>Grenada<strong>, </strong>Saint Lucia and Guyana</p><p>&nbsp;</p><p>The Organisation of the Eastern Caribbean States Commission (OECSC) has received financing from the World Bank toward the cost of the Caribbean Efficient and Green-Energy Buildings Project. The OECSC intends to apply part of the proceeds for Investment-grade audits and detailed design of Energy Efficiency Measures (EEM) and Distributed Photovoltaic (DPV) systems in Public Buildings and Facilities in Grenada, Saint Lucia and Guyana.</p><p>&nbsp;</p><p>The objective of this assignment is to conduct Investment Grade Audits (IGAs), compliant with ASHRAE Level 3 standards or equivalent, for selected public buildings in Grenada, Guyana, and Saint Lucia, in order to identify, evaluate, and prioritize Energy Efficiency Measures (EEMs) and Distributed Photovoltaic (DPV) systems for implementation.</p><p>The assignment will support the preparation of investment-ready interventions for approximately 250 public buildings through:</p><p>&nbsp;</p><ol><li>Detailed assessment of current building energy performance;</li><li>Identification and technical evaluation of cost-effective EEMs and DPV options;</li><li>Economic and financial analysis of EEMs and DPV proposed measures, including lifecycle costs, savings, payback, IRR, and NPV;</li><li>Preparation of detailed engineering designs, technical specifications, drawings, and Bills of Quantities (BOQs);</li><li>Assessment of environmental and social (E&amp;S) risks associated with the proposed measures in accordance with the World Bank Environmental and Social Framework (ESF), national regulations, and applicable project safeguards instruments; and</li><li>Development of inputs required for procurement including bidding documents for the proposed measures;</li></ol><p>&nbsp;</p><p>The IGAs will be undertaken under a <strong>2-year Framework Agreement</strong>, in the first instance, with distinct batches of buildings addressed under call-off assignments expected to last 6-8 months per batch.</p><p>&nbsp;</p><p>The OECS Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. In the assessment of submissions, consideration will be given to technical competence, qualifications and experience, and local and regional experience on similar assignments.</p><p>&nbsp;</p><p><strong>Key Experts will not be evaluated at the shortlisting stage.</strong></p><p>&nbsp;</p><p><strong>The shortlisting criteria are:</strong></p><p>&nbsp;</p><ol><li>A firm with relevant international (experience outside the country where the firm is based) project experience for at least ten (10) years. Relevant technical experience would include programs related to EEMs and DPVs in buildings (especially public buildings).</li><li>At least Five (5) years of experience conducting ASHRAE Level 3 or equivalent energy audits in public buildings and having completed at least 3 assignments covering a combined minimum of 50 buildings.</li><li>At least 3 completed projects involving identification and technical evaluation of EEMs with a minimum contract value of USD $170,000.</li><li>At least 2 completed projects involving design or assessment of distributed solar PV systems with a minimum contract value of USD $100,000.</li><li>At least 3 completed projects involving preparation of engineering designs, technical specifications, drawings, and BOQs for energy efficiency and/or solar PV projects.</li><li>At least 3 completed projects involving financial/economic analysis of energy projects, including energy savings, lifecycle costs, payback, NPV and IRR.</li><li>At least 2 completed projects involving environmental and social screening and/or ESMP preparation for energy or infrastructure projects.</li><li>At least three (3) years of experience in providing similar services in the Latin America and Caribbean (LAC) region or SIDS.</li></ol><p>&nbsp;</p><p>To obtain the maximum degree of comparison among Expressions of Interests (EOIs) and facilitate the evaluation process, the EOI should be a <strong>MAXIMUM of Thirty (30) pages</strong> and include the following information mentioned below:</p><p>&nbsp;</p><ul><li>Title page with name of firm submitting the EOI: should contain name of firm (or joint venture and/or a sub-consultancy, if applicable), address, email, telephone, name of contact person and date of submission.</li></ul><p>&nbsp;</p><ul><li>Expression of Interest: including the firm&rsquo;s general and specific experience.</li></ul><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.15, 3.16, and 3.17 of The World Bank Procurement Regulations for IPF Borrowers : Procurement in Investment Project Financing - Goods, Works, Non-Consulting and Consulting Services - Sixth Edition (English), February 2025 (&lsquo;Procurement Regulations&rsquo;) setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Consulting Firms wishing to signify their interest in undertaking the prescribed services are to submit an Expression of Interest (EOI) providing information demonstrating that they have the required qualifications and relevant experience to perform the services.</p><p>&nbsp;</p><p>Consultants must clearly indicate whether they intend to associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>Expressions of interest can be submitted via email to the first address and copied to the second address by <strong>October 12, 2026, </strong>at <strong>16:00 hours Eastern Caribbean Time (EST)</strong>. Email submissions should include the name and address of the Consultant and shall be clearly marked in the subject line as <strong>&ldquo;Expression of Interest- Investment-grade audits and detailed design of Energy Efficiency Measures (EEM) and Distributed Photovoltaic (DPV) systems in Public Buildings and Facilities in Grenada, Saint Lucia and Guyana.&rdquo;</strong></p><p>&nbsp;</p><p>Further information can be obtained at the address below between 09:00 and 16:00 hours (Atlantic Standard Time) Monday to Friday.</p><p>&nbsp;</p><p><strong>Tehillah Bannis</strong></p><p><strong>Procurement Officer</strong></p><p><strong>Organisation of the Eastern Caribbean States Commission</strong></p><p><strong>P.O. Box 179</strong></p><p><strong>Morne Fortune</strong></p><p><strong>Castries</strong></p><p><strong>St. Lucia</strong></p><p><strong>Tel: 1-758-455-6418</strong></p><p><strong>E-mail: </strong><strong><em>procurementbids@oecs.int</em></strong><strong><em> Copied to: </em></strong><strong><em>shanna.emmanuel@oecs.int</em></strong></p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) based selection method set out in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Sixth Edition, February 2025.</p><p>&nbsp;</p><p>The Terms of Reference (TOR) for this consultancy is provided below.</p><p>&nbsp;</p><p><strong>Terms of Reference</strong></p><p><strong>I</strong><strong>nvestment-grade audits and detailed design of Energy Efficiency Measures (EEM) and Distributed Photovoltaic (DPV) systems in Public Buildings and Facilities in Grenada, Saint Lucia and Guyana.</strong></p><p><strong>Introduction and Context</strong></p><p>&nbsp;</p><p>Despite the availability of indigenous renewable energy resources, many Caribbean nations continue to rely heavily on imported fossil fuels which has threatened energy security and led to high electricity prices. The vast majority of power generation capacity in countries such as Guyana, Saint Lucia, and Grenada, consists of heavy fuel oil and diesel-fired power plants. The reliance on expensive imported heavy fuel oil and diesel fuel, together with the inability to take advantage of economies of scale due to the small market sizes of individual island states, has resulted in extremely high electricity tariffs in these countries. The Governments of Grenada, Guyana and Saint Lucia have established policies and goals for transition to low carbon economies and transformation of their power sector supply mix to make use of indigenous renewable energy resources.&nbsp; In addition to National Energy Policies and Plans, these countries have also articulated national climate actions which speak clearly to the development of solar energy and increased energy efficiency as part of the national development.</p><p>&nbsp;</p><p>The buildings sector is seen as an important untapped opportunity for sustainable energy in the Caribbean. Preliminary energy surveys of selected buildings in the named countries have indicated major benefits from investments in EE and distributed solar photovoltaic (PV) systems. These interventions can reduce dependency on fossil fuels while cultivating a landscape of energy independence, lower electricity costs, decrease GHG emissions, enhance resilience of critical public services and increase occupancy comfort. The results from these energy surveys indicate that EE and RE investments are economically viable with preliminary indications of payback periods of less than 5 years.</p><p>&nbsp;</p><p>The Governments of Grenada, Guyana and Saint Lucia have received financing from the World Bank (WB) toward the costs of the multi-country Caribbean Efficient and Green Energy Buildings Project (CEGEB Project).The CEGEB Project is designed to address common challenges in the energy sector that countries in the region face and will support investment in EE measures and RE systems, such as distributed solar PV systems installed on rooftops or in public spaces. The EE retrofits will include passive and active EE measures along with improvements in building-control systems. Passive EE measures will include energy-efficient windows, shading, wall and roof insulation, and cool surfaces. Active EE measures will include the replacement of existing inefficient building equipment and appliances, or installation of new energy efficient equipment and appliances, such as lighting systems, air-conditioning equipment, air handling systems, ceiling fans, and refrigerators or freezers using refrigerants with low or no global-warming potential (GWP), where appropriate. Improvements in control systems will include smart controls, sensors, and energy-management systems to meet EE objectives. The Project will also support the safe disposal of used equipment and materials.</p><p>&nbsp;</p><p>Part of the financing from the CEGEB Project will be used to hire consulting firms (hereafter referred to as the Consultant) to undertake investment grade audits (IGAs), with minimum ASHRAE level 3 or equivalent standards in approximately two hundred and fifty (250)&nbsp; public buildings in Grenada, Guyana and Saint Lucia to prepare detailed designs, technical specifications, and bidding documents for EE measures (EEMs) and distributed solar PV systems (DPVs) for these buildings. The IGAs will be undertaken under a 2-year Framework Agreement, in the first instance, with distinct batches of buildings addressed under call-off assignments expected to last 6-8 months per batch.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Objectives of the assignment</strong></p><p>The objective of this assignment is to conduct Investment Grade Audits (IGAs), compliant with ASHRAE Level 3 standards or equivalent, for selected public buildings in Grenada, Guyana, and Saint Lucia, in order to identify, evaluate, and prioritize Energy Efficiency Measures (EEMs) and Distributed Photovoltaic (DPV) systems for implementation.</p><p>The assignment will support the preparation of investment-ready interventions for approximately 250 public buildings through:</p><ul><li>detailed assessment of current building energy performance;</li><li>identification and technical evaluation of cost-effective EEMs and DPV options;</li><li>economic and financial analysis of EEMs and DPV proposed measures, including lifecycle costs, savings, payback, IRR, and NPV;</li><li>preparation of detailed engineering designs, technical specifications, drawings, and Bills of Quantities (BOQs);</li><li>assessment of environmental and social (E&amp;S) risks associated with the proposed measures in accordance with the World Bank Environmental and Social Framework (ESF), national regulations, and applicable project safeguards instruments; and</li><li>development of inputs required for procurement including bidding documents for the proposed measures;</li></ul><p>The assignment shall also assess structural, operational, social and environmental conditions that may affect implementation of the proposed investments and recommend any required remediation measures.</p><p>The final list of buildings to be audited will be confirmed through Call-Off Contracts.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Scope of Work</strong></p><p>&nbsp;</p><p>The full scope of this assignment includes the identification, assessment, prioritization, and detailed design of Energy Efficiency Measures (EEMs) and Distributed Photovoltaic (DPV) systems, together with preparation of the technical, financial, social, environmental, and procurement documentation required for implementation.</p><p>The Consultant shall prepare:</p><ul><li>detailed technical assessments and energy audits;</li><li>engineering designs and drawings;</li><li>technical specifications;</li><li>bills of quantities (BOQs);</li><li>cost-benefit and financial analyses;</li><li>measurement and verification (M&amp;V) plans;</li><li>environmental and social screening reports; and</li><li>Environmental and Social Management Plans (ESMPs).</li></ul><p>The OECS Commission and the National Project Implementing Units (PIUs) will facilitate coordination with the selected buildings&rsquo; administration and provide access to available documentation, including utility bills, preliminary energy surveys, and existing drawings.</p><p>The Consultant shall verify the completeness and accuracy of all available information through site visits and field assessments. Where drawings are unavailable or outdated, the Consultant shall prepare or update as-built drawings as necessary.</p><p>The Consultant shall report (providing update on identified challenges, risks and progress to date) to the OECS Commission and participate in biweekly coordination meetings with the OECS Commission, National PIUs, and the World Bank.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>The Consultant shall perform the following 4 tasks to complete the assignment:</p><p>&nbsp;</p><p><strong>Task 1: Review of Existing Energy Audits &amp; Surveys, and Inception Report</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>The Consultant shall review all existing energy surveys, preliminary audits, utility consumption data, and related documentation for the selected buildings. These assessments shall serve as reference material for the development of the IGAs but shall not replace the detailed analyses required under this assignment.</p><p>Based on the review, the Consultant shall develop the methodology and workplan for conducting the IGAs and associated technical, financial, and environmental assessments.</p><p>The Consultant shall:</p><ul><li>assess the adequacy of the existing surveys and identify data gaps;</li><li>define the methodology for conducting ASHRAE Level 3 IGAs;</li><li>prepare a measurement and data collection plan;</li><li>define the methodology for identification and prioritization of EEMs and DPV systems;</li><li>establish the approach for technical design development, preparation of specifications, BOQs, and bidding documentation;</li><li>identify environmental and social risks and define the methodology for preparing ESMPs;</li><li>assess existing electrical infrastructure and identify areas of non-compliance with applicable electrical codes and regulations; and</li><li>prepare a detailed work program and staffing plan.</li></ul><p>&nbsp;</p><p>Deliverables:</p><p>Inception Report and E&amp;S Screening Report</p><p>The Inception Report shall include, but not be confined to:</p><ol><li>findings from the review of existing surveys and documentation;</li><li>the finalised methodology and implementation approach (workplan);</li><li>site visit, data collection plans and E&amp;S assessments (including staff allocation and details)</li><li>confirmed measurement and audit protocols;</li><li>finalised list of equipment and instruments to be used;</li><li>proposed schedule and deliverables;</li><li>identification of risks and constraints; and</li><li>required support from the OECS Commission and National PIUs.</li></ol><p>&nbsp;</p><p><strong>Task 2: Site Assessments, Investment Grade Audits, and Identification and assessment of EEMs and DPV Systems</strong></p><p>&nbsp;</p><p><strong><em>Site Visits and Data Collection</em></strong></p><p>&nbsp;</p><p>The Consultant shall conduct detailed site visits and consultations with facility managers, building operators, and users to collect all information necessary to complete the IGAs.</p><p>The Consultant shall undertake all measurements and inspections required to comply with ASHRAE Level 3 requirements, using appropriately calibrated instruments and equipment.</p><p>&nbsp;</p><p>Consultants will be responsible, to arrange, calibrate and use their own (or rented) instruments and gauges for all electrical end use equipment and appliances as well as passive features of the buildings, including roof structure, strength etc. needed to locate DPV measures.</p><p>&nbsp;</p><p>&nbsp;</p><p>The following information shall be documented for each building, inter alia as required in ASHRAE Level 3 energy audit guidelines:</p><p>&nbsp;</p><ul><li>General building characteristics, floor areas (m2) and age (including date of any major retrofits), typology and general use of the building,</li><li>Building layout, floorplan, and site plan with the orientation of the building and the surroundings.</li><li>Fenestration and Solar Protection: Details on window and door types, dimensions, frame materials, and glazing (e.g., single/double pane). Documentation of building orientation relative to solar path, and the presence and condition of external shading devices, awnings, or hurricane shutters.</li><li>Structural assessment: inspection by a qualified Engineer of structural integrity of roof, ceiling, physical condition of building, and any defects that could affect longevity, utility, safety, or feasibility of DPV and EEM installations,</li><li>Environmental inspection: presence of water damage or mold, evidence of wood- destroying insects or other vermin or pest infestation, or presence of asbestos or other hazardous materials, but not limited to these only,</li><li>Operations: Occupancy rate, occupancy schedules, descriptions of current energy usage and management activities for each and every electrical end use equipment, appliance and system,</li><li>Indoor comfort: Temperature, humidity, CO2 and lighting levels in a representative sample of occupied building spaces</li><li>Utility information: Data available about energy consumption, loads and costs for energy services. Review and analysis of the energy bills and data on electric (and fossil fuels if any) energy consumption and water bills (if any) for at least 24 months.</li><li>Building envelope conditions: e.g., area and composition of external walls, floors, roofs, and windows, building geometry, thermal transmittance and u-values of building elements,</li><li>Energy systems: energy sources, technical characteristics of equipment comprising cooling controls, ventilation, sanitary hot water, air conditioning and lighting systems, electrical distribution systems, among others,</li><li>Inventory of existing systems and electrical equipment: HVAC systems (including the refrigerant type and quantity), air handling systems, automatic control systems, lighting, motors, electrical infrastructure<strong>, </strong>including condition and capacity of main distribution boards, sub-panels, circuit breakers, and cabling, including an assessment of spare capacity for DPV integration and compliance with current electrical codes, etc.,</li><li>Assessment of the energy performance levels of the existing systems and equipment from equipment ratings and specifications or measurements,</li><li>Other relevant information impacting energy consumption levels, such as operating hours of the institution and energy services, number of users, indoor comfort measurements and occupant surveys (temperatures, humidity), energy consumption related to behavior of the users, thermostat settings etc.,</li><li>Total building&rsquo;s electrical load and energy consumption measurement for at least one week to identify electricity consumption during weekdays and weekends,</li><li>Energy consumption of air conditioning systems and indoor temperatures, at least for 24 hours,</li></ul><ul><li>Output values like airflow, water flow, air and water temperatures of cooling production and distribution central systems,</li></ul><ul><li>Electrical consumption of lighting systems for sample circuits, and lighting level (lux) in sample representative locations, and their types and efficacy (lumens per watt).&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li><li>Verification of compliance of all electrical and electro-mechanical installations with national applicable regulations, codes and standards in consultation with the relevant governing Electrical Authority: This should include:<ul><li>Analysis of the capacity of electrical boards,</li><li>Analysis of the status of the main wiring,</li><li>Analysis of the load demands on the mains of power equipment,</li><li>Verification the existence of protective earth connection and lightning protection where required,</li><li>Diagnosis of the state of the buildings&#39; electrical installations, proposing necessary improvement measures, including estimated costs,</li><li>Identification of the location for the inverters, DC and AC cables.</li></ul></li></ul><p>&nbsp;</p><p>The Consultant shall also identify any structural or environmental remediation works required to enable implementation of the proposed measures.</p><p>&nbsp;</p><p>&nbsp;</p><p><br /><strong><em>Identification and Assessment of EEMs</em></strong></p><p>Based on the analysis of the above information, the Consultant shall develop calibrated baseline energy models for each building using either actual and/or normative energy performance, as appropriate.</p><p>&nbsp;</p><p>The actual baseline shall be used as the reference case where measured indoor environmental conditions meet applicable comfort standards and installed systems comply with applicable codes and regulations.</p><p>&nbsp;</p><p>A normative baseline shall be developed and used where: (i) measured indoor temperatures or other indoor environmental conditions fall outside acceptable comfort ranges for normal occupancy; and/or (ii) installed active systems, equipment, or operating conditions do not comply with applicable regulations, codes, or minimum performance standards. In such cases, the normative baseline shall represent energy consumption under compliant operating conditions, assuming indoor comfort levels consistent with recognized standards and equipment performance in accordance with applicable regulations.</p><p>&nbsp;</p><p>The calibrated energy model shall provide estimates of baseline energy consumption, whether actual or normative, disaggregated by energy use for cooling, preparation of sanitary hot water, indoor lighting, ventilation and other relevant energy uses.</p><p>&nbsp;</p><p>The Consultant shall identify and evaluate technically feasible and cost-effective EEMs, including both passive and active measures, in accordance with applicable national (for Grenada, Guyana and Saint Lucia) and regional standards and regulations (including the CARICOM Regional Energy Efficiency Buildings Code, the OECS Building Code and EE Minimum Energy Performance Standards (MEPS) and EE Labeling).</p><p>&nbsp;</p><p>&nbsp;</p><p>For each proposed EEM, the Consultant shall determine:</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; projected energy and demand savings (kWh and kW);</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; fuel savings and greenhouse gas emission reductions;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; investment and operating costs;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; implementation and maintenance requirements;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; payback period;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; internal rate of return (IRR);</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; net present value (NPV); and</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; associated co-benefits.</p><p>&nbsp;</p><p>&nbsp;</p><p>The investment costs of EEMs should be determined based, to the best extent possible, on preliminary quotes from contractors, vendors, and installers, or ESCOs .Cost estimates shall include all direct and indirect implementation costs, including remediation works, electrical upgrades, commissioning, disposal of waste materials, and associated civil works.</p><p>All HVAC-related recommendations shall prioritize low-GWP refrigerants in accordance with the Montreal Protocol and Kigali Amendment requirements.</p><p>The Consultant shall provide a complete list of all EEMs considered and prepare a prioritization of recommended EEMs based on the methodology approved by the OECS Commission and the World Bank in Task 1.</p><p>The consultants shall provide a recommended investment package for each building which&nbsp; shall achieve the following minimum performance thresholds:</p><ul><li>EE-only package : minimum 20% energy savings from the appropriate baseline and maximum simple payback of 10 years;</li><li>EE + DPV package: minimum 30% energy savings from the appropriate baseline and maximum simple payback of 20 years.</li></ul><p>The Consultant shall also prepare a Measurement and Verification (M&amp;V) Plan consistent with international best practice such as the International Performance Measurement and Verification Protocol (IPMVP) or its equivalent. The M&amp;V Plan shall specify for each EEM the parameters to be measured, the pre-implementation baseline values for these parameters, the post-implementation measurements, and the methodology for calculation of the achieved energy savings and making any needed adjustments for changes in any baseline parameters.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;</strong><strong>DPV System Assessment </strong></p><p>&nbsp;</p><p>The Consultant shall assess the technical feasibility of DPV systems for each building, including:</p><ul><li>roof condition, structural integrity, and load-bearing capacity;</li><li>available roof and carport areas;</li><li>solar resource and shading analysis;</li><li>electrical interconnection requirements;</li><li>inverter and cable routing locations;</li><li>access and safety considerations; and</li><li>resilience requirements for hurricane-force winds, high temperatures, and corrosive environments.</li></ul><p>The assessment will be conducted&nbsp; through visual inspection, analysis of the existing data and roof specifications. Where roof information is insufficient, the Consultant may recommend Finite Element Analysis (FEA), subject to approval by the requesting country in consultation with the&nbsp; OECS Commission and the World Bank. Technical requirement for an FEA is provided in Annex 3. The consultant shall also propose&nbsp; the estimated price for undertaking a FEA of a typical building to be considered when a FEA is required and approved. The FEA cost shall not be used in the financial evaluation but shall be considered later in the project for the payment of each approved FEA.</p><p>The Consultant shall:</p><ul><li>Model each DPV system using PVsyst;&nbsp; or equivalent</li><li>Define DC and AC capacities, considering a minimum 25% DC/AC oversizing ratio;</li></ul><p>&nbsp;</p><ul><li>Provide the area available for solar PV modules in m2 and consider a high efficiency PV module (not less than 21.5%) for the conversion to kWp. The consultant shall explain the area considered versus the available area for the PV modules and refrain from providing only kWp. To estimate AC capacities, a minimum of 25% DC/AC oversizing shall be considered.</li><li>The DPV systems will be designed to be climate- and weather-resilient, including resistance to high winds-specifically, structural integrity to withstand impacts equivalent to a Category 5 hurricane, high temperatures, and, where relevant, corrosion risk.</li></ul><p>&nbsp;</p><p><strong>Deliverables</strong></p><p><strong>Detailed Task 2 Report</strong>, consisting of an Executive Summary and an agreed standardized template for building-level outputs, an excel sheet showing &nbsp;calculations/formulae used in deriving the recommended measures and associated slide deck, a separate section for each building, including:</p><ul><li>all data collected</li><li>complete list of EEMs and list of recommended EEMs for implementation, based on cost-benefit and financial analysis, and M&amp;V plan.</li><li>Proposed DPV systems: areas available, loads and indicative yields</li></ul><p>&nbsp;</p><p><strong>Task 2 Report, including: </strong></p><ul><li><ul><li>Executive Summary;</li><li>detailed findings for each building;</li><li>baseline analyses;</li><li>list of all assessed and recommended EEMs;</li><li>financial and economic analyses;</li><li>M&amp;V Plan;</li><li>proposed DPV systems and indicative designs</li></ul></li></ul><p>&nbsp;</p><p><strong>Task 3. Detailed design of EEMs and DPV, technical specifications, and bills of quantities</strong></p><p>&nbsp;</p><p><strong>EEM</strong></p><p>Following approval by the Countries of the proposed EEMs in Task 2, the Consultant shall prepare the detailed designs (including the appropriate architectural, mechanical, and electrical drawings) technical specifications, bills of quantities and bidding documents for each EEM in each building.</p><p>&nbsp;</p><p>&nbsp;</p><p>The Consultant shall prepare:</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Architectural (plans, sections, facades, technical details of building envelope and layout), mechanical, electrical, and structural drawings;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design calculations;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Technical specifications;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Bills of quantities;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Remediation or structural correction plans (mold, pests, roof elements) if required;</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Implementation requirements; and</p><p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; bidding documentation inputs.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>For technical requirements and specifications that will be linked to new materials or equipment not included in country- specific norms or standards, the Consultant shall follow relevant recognized international norms and codes. The technical design shall also take into account relevant regulations in the participating countries on health, environmental protection and safety, any existing environmental management plans for public buildings and facilities, and the environmental and social management framework for the project (ESMF) provided by the OECS Commission. The technical design documentation shall be certified by the Consultant according to relevant provisions in the Law on Construction of the respective country.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>In case approval from local authorities/state expertise for the reconstruction/building retrofits in accordance with local legislation is needed, provide technical support in the approval process if required.</p><p>&nbsp;</p><p><strong>Deliverables</strong></p><p>The Report shall specify the EEMs and related detailed design (including the appropriate architectural, mechanical, and electrical drawings (in DWG and PDF formats) technical specifications, bills of quantities as needed for preparation of the bidding documents for each EEM.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>DPV systems</strong></p><p>Following approval by the countries of the proposed DPV systems in Task 2, the Consultant shall prepare the detailed designs (including the appropriate architectural, mechanical, and electrical drawings) technical specifications, bills of quantities and bidding documents for each DPV in each building.</p><p>&nbsp;</p><p>The Consultant shall undertake, at a minimum, the following activities:</p><p>&nbsp;</p><p><strong>Solar Resource Assessment and Energy Yield Modelling</strong></p><ul><li>Model each proposed solar DG system using PVsyst or equivalent and provide energy yield assessments, including P50 and P90 generation estimates.</li><li>Conduct a detailed solar resource assessment and demonstrate that the solar irradiation data source used is reliable, current, and of acceptable quality.</li><li>Design all solar PV systems, including grid-connected systems, to maximize the use of available installation areas for energy generation while maintaining a minimum DC/AC oversizing ratio of 25%.</li></ul><p><strong>System Capacity Assessment and Sizing</strong></p><p>Determine the optimal AC system capacity for each site based on:</p><ul><li>Historical electricity consumption data covering a minimum of one (1) year and, where available, up to three (3) years.</li><li>On-site load measurements conducted over a minimum period of one (1) full week for each building, where feasible.</li><li>The contracted AC capacity and/or available grid connection capacity as confirmed by the utility company.</li></ul><ul><li>Report the ratings of all relevant breakers and electrical protection devices associated with the point of interconnection.</li><li>Identify and report the maximum feasible AC and DC capacities that can be installed at each building while maintaining a minimum DC/AC oversizing ratio of 25%.</li></ul><p><strong>Site Assessment and Equipment Location Identification</strong></p><ul><li>Conduct site visits and identify all buildings included in the project.</li><li>Consult with building owners and/or responsible personnel to determine suitable locations for:</li></ul><ul><li>PV modules;</li><li>Inverters;</li><li>DC cabling routes;</li><li>AC cabling routes;</li><li>Main switchboards or equivalent equipment for grid interconnection; and</li><li>Utility meters and metering infrastructure.</li></ul><ul><li>Assess and document roof access arrangements, constraints, and any installation considerations.</li></ul><p>&nbsp;</p><p><strong>Carport Assessment</strong></p><p>&nbsp;</p><ul><li>Evaluate the feasibility of solar PV carports at each site.</li><li>Characterize, quantify, and describe all potential carport installation areas, including their estimated generation potential and associated infrastructure requirements.</li></ul><p><strong>Preliminary System Design</strong></p><ul><li>Prepare and submit for each solar DG system:</li></ul><ul><li>Indicative layouts;</li><li>Single-line diagrams (SLDs);</li><li>Electrical configurations; and</li><li>A description of the main equipment and system components.</li></ul><p><strong>Economic, Financial and Environmental Analysis</strong></p><ul><li>Develop cost estimates for each proposed solar PV system based on both local market pricing and international benchmark pricing.</li><li>For each building and proposed system, calculate and report:</li></ul><ul><li>Electricity savings;</li><li>Fuel savings (where applicable);</li><li>Greenhouse gas (GHG) emission reductions;</li><li>Cost savings;</li><li>Operation and maintenance (O&amp;M) costs;</li><li>Capital investment requirements;</li><li>Simple payback period;</li><li>Internal Rate of Return (IRR); and</li><li>Net Present Value (NPV).</li></ul><p><strong>Draft Feasibility Report</strong></p><ul><li>Prepare and submit a draft report on the proposed Distributed Photovoltaic (DPV) systems to the countries.</li></ul><p>The report shall include the technical assessment, proposed system configurations, and the results of all economic, financial, and environmental analyses for review and approval.</p><p><strong>Procurement and Tender Documentation</strong></p><ul><li>Prepare the technical documentation required for DPV procurement, including:</li></ul><ul><li>Detailed designs;</li><li>Technical specifications;</li><li>Bills of Quantities (BOQs); and</li><li>Any other technical information required for the bidding documents covering goods, services, and works.</li></ul><p>As the implementation contracts will be based on an Engineering, Procurement and Construction (EPC) approach, the Consultant shall avoid over-specification of equipment and technologies. Technical specifications shall focus on minimum performance, energy generation, reliability, and delivery requirements while allowing bidders sufficient flexibility to propose compliant technical solutions.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Deliverables</strong></p><ul><li>Detailed design (including the appropriate architectural, mechanical, and electrical drawings (in DWG and PDF formats) technical specifications, bills of quantities needed for preparation of the bidding documents for each DPV system.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Task 4: Identify environmental and social risks and prepare Environmental and Social Management Plans (ESMPs)</strong></p><p>&nbsp;</p><p>The Consultant shall identify environmental and social risks associated with the proposed investments and prepare the required environmental and social management documentation in accordance with the project&rsquo;s ESMF, the World Bank ESF and Environmental Health and Safety (EHS) Guidelines and applicable national regulations.</p><p>The Consultant must adhere to and include in the ESMP the Environmental and Social Standards (ESS) relevant to the assignment which include:</p><p>ESS 1: Assessment and Management of Environmental and Social Risks and Impacts;</p><p>ESS 2: Labour and Working Conditions;&nbsp;</p><p>ESS 3: Resource Efficiency and Pollution Prevent and Management and</p><p>ESS 10: Stakeholder Engagement and Information Disclosure.</p><p>&nbsp;</p><p><strong>Environmental and Social Assessment and Management</strong></p><p>Under this Task, the Consultant shall undertake the following activities:</p><p><strong>1. Environmental and Social&nbsp; Risk Assessment</strong></p><ul><li>Identify and assess the environmental and social risks and impacts associated with each proposed EE and DPV intervention and determine the corresponding risk level.</li><li>Identify the presence, location, condition, and estimated quantities of hazardous and non-hazardous materials that may require removal, handling, storage, transportation, or disposal during implementation. Hazardous materials may include, but are not limited to:<ul><li>Asbestos-containing materials;</li><li>Mercury-containing lamps and lighting equipment;</li><li>Ozone-depleting substances (ODS) and refrigerants;</li><li>Electronic waste (e-waste); and</li><li>Other hazardous construction or demolition waste.</li></ul></li></ul><p><strong>2. Preparation of Site-Specific Environmental and Social Management Plans (ESMPs)</strong></p><ul><li>Based on the findings of the E&amp;S screening and risk assessment, prepare site-specific Environmental and Social Management Plans (ESMPs) and any other E&amp;S instruments (such as Labour Management Procedures and a Stakeholder Engagement Plan) required under the ESMF using the agreed templates.</li><li>Submit all ESMPs to the OECS Commission for review and approval.</li><li>The ESMPs shall include all mitigation, monitoring, reporting, and institutional measures required to manage identified environmental and social risks throughout project implementation and operation.</li><li>The ESMPs shall also include technical specifications, environmental and social requirements, contractual clauses, and Bills of Quantities (BOQs) for incorporation into the bidding documents and subsequent contracts for design, supervision, supply, installation, and construction works.</li></ul><p><strong>3. Waste Management Assessment</strong></p><p>For each building or site, the ESMP shall:</p><ul><li>Identify all waste streams expected to be generated during implementation;</li><li>Estimate the quantities of each waste stream;</li><li>Classify waste streams as hazardous or non-hazardous;</li><li>Identify materials requiring special handling, including but not limited to asbestos-containing materials, mercury-containing lamps, ozone-depleting substances, refrigerants, and electronic waste;</li><li>Define procedures for waste segregation, collection, packaging, temporary storage, transportation, treatment, recycling, and final disposal;</li><li>Identify approved disposal facilities and any interim storage locations in accordance with national legislation and the requirements of the ESMF;</li><li>Specify occupational health and safety requirements, including personal protective equipment (PPE), handling procedures, worker protection measures, and monitoring requirements in accordance with national legislation and the World bank&rsquo;s EHS Guidelines and ESS 2; and</li><li>Provide cost estimates for implementation of all environmental, social, health, and safety mitigation measures.</li></ul><p><strong>4. Stakeholder Consultation Support</strong></p><ol><li>Support the countries in conducting site-specific stakeholder and public consultations on the energy audits, proposed investments, and draft ESMPs.</li><li>The countries will lead and organize the consultations; however, the Consultant shall prepare all technical materials, presentations, summaries, and supporting documentation required for the consultation process.</li><li>The Consultant shall participate in consultations as requested and provide technical explanations of proposed mitigation, monitoring, and management measures.</li><li>Consultations shall present:<ul><li>The proposed EEM and DPV interventions;</li><li>The identified environmental and social risks and impacts;</li><li>The mitigation and monitoring measures proposed in the ESMPs;</li><li>Institutional responsibilities for implementation and monitoring;</li><li>Resource requirements for implementation of the ESMPs; and</li><li>The project grievance mechanism.</li></ul></li></ol><ul><li>Following the consultations, the Consultant shall document stakeholder feedback, address comments as appropriate, and revise the ESMPs accordingly.</li><li>The final ESMPs shall include a summary of the consultation process, stakeholder comments received, and actions taken in response to those comments.</li></ul><p><strong>Deliverables</strong></p><p><strong>Environmental and Social Management Plans (ESMPs)</strong></p><ul><li><ul><li>Site-specific ESMPs for all buildings and proposed interventions, including consultation records and summaries.</li></ul></li></ul><p>&nbsp;</p><p>Buildings with similar characteristics, risks, and intervention types may be grouped under a common ESMP approach and pricing of interventions per unit area, subject to agreement with the OECS Commission following review of the Inception Report and Screening Report. The building categories proposed are</p><p>1) Healthcare Buildings;&nbsp;</p><p>2) Educational Buildings;&nbsp;</p><p>3) Government Administrative Offices;</p><p>4) Storage Facilities&nbsp; and;</p><p>5) Security Buildings (eg police and military)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>Services to be provided to the Consultant</u></strong></p><p>The OECS Commission will provide the Consultant with the preliminary energy surveys already conducted and introductions to the respective building administrators.</p><p>&nbsp;</p><p>The Consultant will be responsible for all other arrangements to ensure coordination with the respective buildings&#39; administrations and all relevant entities.</p><p>It will be the responsibility of the consultant, when site visits are carried out, to ensure that all safety precautions are taken.</p><p><strong>Qualifications/Experience</strong></p><p><strong>Consulting Firm:</strong></p><ol><li>The Consultant should be a firm with relevant international (experience outside the country where the firm is based) project experience for at least ten (10) years. Relevant technical experience would include programs related to EEMs and DPVs in buildings (especially public buildings).</li><li>At least Five (5) years of experience conducting ASHRAE Level 3 or equivalent energy audits in public buildings and having completed at least 3 assignments covering a combined minimum of 50 buildings.</li><li>At least 3 completed projects involving identification and technical evaluation of EEMs with a minimum contract value of USD $170,000.</li><li>At least 2 completed projects involving design or assessment of distributed solar PV systems with a minimum contract value of USD $100,000.</li><li>At least 3 completed projects involving preparation of engineering designs, technical specifications, drawings, and BOQs for energy efficiency and/or solar PV projects.</li><li>At least 3 completed projects involving financial/economic analysis of energy projects, including energy savings, lifecycle costs, payback, NPV and IRR.</li><li>At least 2 completed projects involving environmental and social screening and/or ESMP preparation for energy or infrastructure projects.</li><li>At least three (3) years of experience in providing similar services in the Latin America and Caribbean (LAC) region or SIDS.</li></ol><p>&nbsp;</p><p><strong>Key/Non-Key Experts</strong></p><p>&nbsp;</p><p>The Consultant must propose a team capable of successfully carrying out all aspects of the TOR with local/international in-depth experience in executing similar assignments, including certified energy auditors, EE and DPV experts, financial specialists, structural integrity expert, environmental and social specialists, and M&amp;V specialists, etc. The Consultant shall demonstrate the capability to mobilize enough skilled staff for carrying out the project activities within the allocated time covering all buildings.</p><p>&nbsp;</p><p>The following key expertise and specialists are expected to be included in the team (to be evaluated as part of the technical proposal):</p><p>&nbsp;</p><p><strong>Key Expert 1: Energy Efficiency Specialist/Project Manager</strong></p><p>The expert has certified energy auditor qualifications and specific experience of 10+ years in similar international EE assessments, Investment grade audits ASHRAE energy audits, energy simulations and EE analysis for buildings. He/she has been project manager of similar international projects involving EE assessments and/or conducting energy audits, developing energy baselines, assessing EEMs in buildings, project commissioning etc. The expert has a university degree in architecture, engineering in the relevant field, energy economics, energy management, or similar field, and solid experience in the identification and assessment of EEMs in buildings and performance of energy audits. Experience in similar countries is an advantage. Fluency in English required.</p><p>&nbsp;</p><p><strong>Key Expert 2: Solar PV specialist</strong></p><p>Solar PVs engineer with a minimum 10 years of experience in similar international investment activities for solar PVs system. University degree in civil/electrical engineering, energy management, or equivalent. Prior experience in preparation of design, construction and bidding documents. Strong knowledge of international and national standards and norms on renewable energy efficiency and building codes. Fluency in English required.</p><p>&nbsp;</p><p><strong>Key Expert 3: Energy Economist/Financial Modeling Expert</strong></p><p>The expert should hold a Master of Science in Economics, Finance, Engineering, or a related field, with a minimum of ten years of demonstrated experience in economic and financial analysis of energy sector projects. This should include a proven track record in conducting investment-grade audits for energy efficiency and renewable energy projects, with strong command of standard financial modeling techniques (NPV, IRR, LCOE, CBA) and experience preparing or reviewing similar models. The expert should also have hands-on experience with technical and financial due diligence for EE and RE investments, including energy savings calculations, M&amp;V frameworks (e.g., IPMVP protocols). Fluency in English required.</p><p>&nbsp;</p><p><strong>Key Expert 4: Environmental and Social Expert</strong></p><p>University degree in environmental engineering or equivalent with at least 10 years of experience in environmental assessments. Focus on hazardous material inventories in buildings, in particular asbestos/mold, and experience with international requirements for proper asbestos and mercury containing CFLs removal, handling and possible treatment options, including costs is preferred. Some expertise in social issues, social risk management and stakeholder consultations will be a plus. Knowledge of international best practices, and development of simplified, low-cost options. Fluency in English required.</p><p>&nbsp;</p><p><strong>Key Expert 5: Structural Integrity Expert</strong></p><p>&nbsp;</p><p>Master of Science in civil/structural engineering or equivalent, Professional certifications in building envelope performance and retrofitting or equivalent. At least 10 years&rsquo; experience in building envelope performance or retrofitting or structural integrity for energy efficiency upgrades. Fluency in English required.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>The proposed team must possess key skills and credentials, including:</p><p>&nbsp;</p><p><strong>On EEMs</strong></p><ul><li>Education of at least bachelor&rsquo;s degree in engineering, architecture or economics.</li><li>Strong knowledge of international and local standards and norms on energy efficiency and building codes.</li><li>Professional experience in the field of this project (energy efficiency, and/or building design/construction, structural integrity)</li><li>Prior experience on energy auditing of buildings and preparation of detailed project designs and technical specifications for EEMs</li><li>Prior experience on preparation of design, construction and bidding documents</li><li>Good communication, management, organization and reporting skills</li></ul><p>&nbsp;</p><p><strong>On DPVs:</strong></p><ul><li>Education of at least bachelor&rsquo;s degree in energy engineering or economics.</li><li>Strong knowledge of international and national standards and norms on renewable energy (solar PV), energy efficiency and building codes.</li><li>Relevant professional experience in the field of this project</li><li>Prior experience on similar activities for solar PVs systems</li><li>Prior experience on preparation of design, construction and bidding documents</li><li>Good communication, teamwork, and reporting skills</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Timeframe and implementation arrangements</strong></p><p>The estimated time frame is expected to be 8 months from the day of the contract signing. Expenditure on logistics, including international travel, is to be included in the proposed costs.</p><p>The Consultant will provide all necessary equipment or resources for the activities.</p><p>&nbsp;</p><p><strong>Deliverables and timeline</strong></p><p>The proposed timeline is outlined below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:744px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:36px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:403px\"><p><strong>Deliverables</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top; width:305px\"><p><strong>Delivery Date</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:36px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:403px\"><p>Inception Report and E&amp;S Screening Report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top; width:305px\"><ul><li>1.5 &nbsp;months from signing the contract</li></ul></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:36px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:403px\"><p>Task 2- Report on Site visits, data collection for EEMs and DPVs; Identification and assessment of EEMs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:305px\"><ul><li>Draft report for one building: 3 months after signing the contract</li><li>Draft report for the remaining buildings: 4 months after signing the contract</li><li>Submission of updated report incorporating all recommended changes 1 month after comments have been received</li><li>Submission of Final approved reports, 8 months after signing the contract</li></ul></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:36px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:403px\"><p>Task 3- &nbsp;</p><p>&nbsp;</p><p>Detailed design of EEMs, technical specifications, and bills of quantities</p><p>&nbsp;</p><p>Detailed design, technical specification &amp; BOQ of DPVs systems</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:305px\"><ul><li>6.5 months after signing the contract</li></ul><p>&nbsp;</p><ul><li>7 months after signing the contract for the remaining buildings</li></ul><p>&nbsp;</p><ul><li>Submission of updated report incorporating all recommended changes 1 month after comments have been received/design</li><li>Submission of Final approved reports/designs, 8 months after signing the contract</li></ul><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:36px\"><p>4&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:403px\"><p>Task 4. &nbsp;ESMPs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:37px; vertical-align:top; width:305px\"><ul><li>5.5 &nbsp;months after signing the contract</li></ul><ul><li>Submission of updated report incorporating all recommended changes 1 month after comments have been received</li></ul><p>&nbsp;</p><ul><li>Submission of final approved ESMP, 8 months after signing the contract</li></ul></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Payment Terms</strong></p><p>&nbsp;</p><p>The maximum proposed cost per square-feet per building classification agreed upon during the Framework Contract award shall serve as absolute fee ceilings. No Call-Off Assignment shall exceed these pre-agreed rates. Individual Call-Off Assignments will be issued on a Lump-Sum basis (linked to specific deliverables) and payments will be disbursed in installments upon formal written acceptance of key deliverables by the Contracting Authority. Travel, accommodation, and per diems are not included in fee rates. Reasonable travel costs directly linked to a Call-Off Assignment will be reimbursed at actual cost as per rates agreed to during the Framework Contract award.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>ANNEX 1: Terms of Reference for the Finite Elements Analysis (FEA)</u></strong></p><p>&nbsp;</p><p><strong>Scope of work</strong></p><p>Rooftops at the buildings/facilities to be used to install PV rooftops includes:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:top; width:75px\"><p><strong>Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:top; width:542px\"><p><strong>Building Name</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:16px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:75px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top; width:542px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>One of the concerns that needs to be addressed is the structural capacity of the rooftops to withstand the PV modules plus structures as well as during installation for safety reasons. The finite element analysis (FEA) for the roof shall include:</p><ol><li>The design criteria for the roofs.</li><li>Specifications for the roof materials used.</li><li>The design criteria for the PV systems: the roof shall be simulated full of PV modules along the longest dimension. The nodes for the FEA should not be spaced more than 1 meter.</li><li>A list of live loads: environmental loads such as worst-case wind conditions perpendicular to the roof and 50 and 100 years data to be used. In addition, seismic criteria, and any other special loads should be considered in the analysis:<ol><li>PV modules plus supporting structures of around 30 kg/m2.</li><li>Humans during installation at 150 kg/m2.</li></ol></li><li>Deflection values of structural elements and the PV systems under several live loads and wind directions as defined above. A graph with the deflection of the roof should be presented with a resolution not more than 1 meter.</li><li>Vertical and lateral load analysis for:<ol><li>PV modules plus supporting structures of around 30 kg/m2.</li></ol></li></ol><p>&nbsp;</p><ol><li><ol><li>Humans during installation at 150 kg/m2.</li></ol></li><li>Dynamic and vibration analyses with and without the PV system.</li><li>Computer analysis and design results with reports for all the cases mentioned above and a set of recommendations if applicable.</li><li>For the case that an analysis proves a roof being incapable for solar usage a solution may be given to re-enforce the roof.</li><li>Please specify the software to be used for the finite elements analysis (FEA) on the proposal.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00470632","notice_type":"Request for Expression of Interest","noticedate":"23-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-10T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia, Federal Republic of","project_id":"P507443","project_name":"Building Opportunities and Outcomes in Social Protection and Youth Employment","bid_reference_no":"SO-MOLSA-570115-CS-INDV","bid_description":"Liaison Officer-Southwest","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Mogadishu,Somalia","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"dowsaahmed79@gmail.com","contact_name":"Fardosa Abdullahi","contact_organization":"Federal Government of Somalia, Ministry of Labour and Social Affairs","contact_phone_no":"+252612090436","submission_date":"2026-09-23T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p><p><strong>COUNTRY:</strong> &nbsp;&nbsp;Federal Republic of Somalia (FRS)</p><p><strong>PROJECT ID: </strong>P507443</p><p><strong>Project Name: </strong>Building Opportunities and Outcomes in Social Protection and Youth Employment<strong> </strong></p><p><strong>Post Title: </strong>Southwest State Liaison Officer</p><p><strong>Reference No.:</strong>&nbsp;SO-MOLSA-570115-CS-INDV</p><p><strong>Duty Station: </strong>Baidoa, Southwest, Somalia</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Southwest State Liaison Officer is required by the Federal Government of Somalia (FGS) to support implementation of a World Bank-funded project, Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST You) (P507443). The selected candidate will work for the government&rsquo;s National Social Protection Program (Baxnaano), established in 2019 and housed at the Federal Ministry of Labor and Social Affairs (MoLSA).</p><p><strong>Project Overview</strong></p><p>The project development objective of Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST-YOU) is to enhance economic opportunities and strengthen resilience of the poor and vulnerable. The project directly contributes to strengthening Somalia&rsquo;s social protection system, expanding coverage through its support to the jobs agenda and building greater resilience to shocks through robust adaptive social protection mechanisms. The project applies an integrated approach that moves beneficiaries along a continuum from protection to production.</p><p>The project aims to support the poor and most vulnerable of the population by providing targeted interventions to improve their resilience and prepare for better jobs tomorrow, while providing job opportunities now by addressing key barriers to better income-generating opportunities. The project will reach about 206,000 households in particularly climate-exposed areas, which is equivalent to over 1.2 million individual beneficiaries.</p><p><strong>SELECTION CRITERIA</strong></p><p>Selection shall be based on the qualification and experience of the candidate and followed by an interview. The qualifications, experience and skills should include:</p><p><strong>Academic Qualifications</strong></p><ol><li>Bachelor&rsquo;s degree in one of the following areas: development studies, social work, management, public administration or business administration or any other relevant fields;</li></ol><p><strong>Professional Experience</strong></p><ol><li><ol><li>Five (5) years of relevant working experience at the national or international level in project/program coordination and management areas including humanitarian organizations, international NGOs, and government.</li><li>Demonstrated knowledge of the Somalia development agenda, mechanisms and principles of social protection, Safety net programs and intra-governmental processes;</li><li>Proven skills and ability in effectively communicating with and coordinating across diverse groups of stakeholders, including project staff, partners, government authorities, private sector, communities as well as beneficiaries;</li><li>Demonstrated experience in stakeholder engagement, community mobilization, or participatory development approaches.</li><li>Excellent communication (spoken and written) skills in Somali and English, including the ability to communicate proactively with key stakeholders, correctly interpret messages from others and respond appropriately.</li></ol></li></ol><p><strong>DURATION: </strong>The successful candidate will work under a one (1) year renewable contract based on competence and approval by MOLSA, Southwest state.</p><p><strong>REPORTING OBLIGATIONS</strong></p><p>The State Liaison Officer will directly report on a day-to-day basis to the Project Manager, Baxnaano through the Operations Team Lead. He/she will be expected to closely work with other Baxnaano PIU members for a smooth run of project operations.&nbsp;</p><p>The Ministry of Labor and Social Affairs, Federal Government of Somalai now invites eligible Individual Consultants to indicate their interest in providing the above-mentioned services. Interested consultants must provide the following: (i) Curriculum Vitae (CV) with 3 references; (ii) copies of certificates of academic qualifications; and (iii) cover letter&nbsp;indicating that they are qualified to perform the services.</p><p><strong>SUBMISSION REQUIREMENTS</strong></p><p>The attention of interested Consultants is drawn to section III, para 3.14,3.16 &amp; 3.17 of the World Bank&rsquo;s&nbsp;<em>Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services, July 2016, revised November 2017, August 2018, November 2020, </em>September<em> 2023</em> and February 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;</p><p><strong>A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations.&nbsp;</strong></p><p>Interested applicants may refer further information including a detailed Terms of Reference in Annex I. &nbsp;&nbsp;&nbsp;</p><p><strong>Deadline</strong>: Expressions of interest and CV must be delivered to this email procurement@baxnaano.gov.so and dg-mole@jubalandstate.so, copy the following emails as well Info@molsa.gov.so, dg@molsa.sw.so , &nbsp;Fardosa.Ahmed@baxnaano.gov.so and abdisalan.artan@baxnaano.gov.so, &nbsp;on or before 16:00 hours<strong> 10th October, 2026, </strong>with email subject marked clearly as &ldquo;<strong>Southwest State Liaison Officer,</strong><strong> </strong><strong>REF:</strong> <strong>SO-MOLSA-570115-CS-INDV</strong></p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Female candidates are encouraged to apply.</strong></p><p>&nbsp;</p><p>----------------------------------------------------------------------------------------------</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Annex I: Terms of Reference</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;State Liaison Officer (Southwest)</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Building Opportunities and Outcomes in Social Protection and </strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Youth Employment (P507443) Project</strong></p><p>&nbsp;</p><p><strong>Background</strong></p><p>Southwest State Liaison Officer is required by the Federal Government of Somalia (FGS) to support implementation of a World Bank-funded project, Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST You) (P507443). The selected candidate will work for the government&rsquo;s National Social Protection Program (Baxnaano), established in 2019 and housed at the Federal Ministry of Labor and Social Affairs (MoLSA).</p><p><strong>Project Overview</strong></p><p>The project development objective of Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST-YOU) is to enhance economic opportunities and strengthen resilience of the poor and vulnerable. The project directly contributes to strengthening Somalia&rsquo;s social protection system, expanding coverage through its support to the jobs agenda and building greater resilience to shocks through robust adaptive social protection mechanisms. The project applies an integrated approach that moves beneficiaries along a continuum from protection to production.</p><p>The project aims to support the poor and most vulnerable of the population by providing targeted interventions to improve their resilience and prepare for better jobs tomorrow, while providing job opportunities now by addressing key barriers to better income-generating opportunities. The project will reach about 206,000 households in particularly climate-exposed areas, which is equivalent to over 1.2 million individual beneficiaries.</p><p>The program supports poor and vulnerable households through following components:</p><p><strong>Component 1: Connecting Youth and Women to Better Jobs Today: </strong>Supports 28,000 youth (60% women &amp; 5% disable persons) in urban areas with limited job opportunities and prolonged periods of inactivity, benefit from economic inclusion activities (wage and self-employment activities). contributing directly creating jobs and strengthening households&rsquo; resilience.</p><p><strong>C</strong><strong>o</strong><strong>mponent 2: Investing in People for Better Jobs Tomorrow: </strong>The component will deliver regular cash transfers to 50,000 of the poorest households to meet basic needs, enhance climate-challenged food security, and prevent negative coping strategies during climate shocks, which in turn helps safeguard the human capital necessary for productive participation in the labor force. Approximately 10,000 shock affected poor and vulnerable households will be supported with emergency cash transfers as part of a contingent financing arrangement in case of climate shocks. 30,000 pregnant women and mothers with children under two will receive health- and nutrition-linked co-responsibility cash transfers (CCTs) to promote maternal and child health, reduce malnutrition, and improve early childhood development, strengthening the human capital necessary for future workforce productivity whilst mitigating adverse climate impacts. An early response-Health and Nutrition CCT will support 83,000 shock affected households with pregnant women and mothers with children under two to reduce the prevalence of significant acute malnutrition and infant mortality in drought affected prioritized districts. An education CCT program will target 5,000 children from the poorest and most climate-affected households, helping build the foundation required for long-term employability by increasing school enrollment and attendance.</p><p><strong>Component 3: Adaptive Social Protection Systems and Project Management: </strong>Supports enhancement of an adaptive social protection system, the National Socio-Economic Survey and project management including institutional capacity building for MoLSA. The objective of this support is to create a robust, efficient, and responsive social protection infrastructure. By strengthening institutional capacity, enhancing data management, strengthening the delivery system and registering the population in the USR, this component lays the foundation for sustainable and effective social protection and multisectoral poverty targeted investments. Under this component National Socio-economic Survey (NSES) will register 12 million people in Somalia in the USR collecting socio-economic data to inform targeting for pro-poor programs in the country. The component also provides support for effective project management, capacity building and oversight of project activities.</p><p><strong>OBJECTIVE AND SCOPE OF WORK:</strong></p><p>The State Liaison Officer will report to the Operations Team Lead and will be responsible for the implementation and delivery of all activities supported under the project. The State Liaison Officer must ensure compliance with operational protocols in the Baxnaano Operations Manual and accompanying guidelines, ensuring close coordination with relevant ministries, authorities, agencies and departments on day-to-day operational issues.</p><p>The Liaison Officer will help to coordinate the implementation of project activities at the State level between the PIU of the MoLSA, WFP and the relevant representatives of the Federal Member State (FMS), as well as other consultants (individuals and firms), hired under the project to facilitate effective delivery of project activities to achieve the overall project objectives. The Liaison Officer will work closely with the MOLSA PIU team and other implementing partners.</p><p>Under the leadership of the Operations Team Lead, duties of the State Liaison Officer will include:</p><ul><li>Serve as a primary point of contact and sensitize the relevant representatives at counterpart ministries at the FMS level, community-based organizations (CBOs) and other social partners on social protection to create support for the project at the FMS level</li><li>Facilitate cooperation between the MoLSA/FGS and the relevant representatives at counterpart ministries at the FMS level on project activities and communicate priorities and concerns of the represented State to the PIU at the FGS level;</li><li>Coordinate with the relevant representatives at counterpart ministries at the State, the PIU/MoLSA, and field teams of WFP, as well as the CBOs and other social protection partners to support the implementation of the project in his/her state;</li><li>Attend and organize relevant meetings to support the implementation and coordination of Baxnaano activities, as requested by the representing State and the PIU/MoLSA</li><li>Prepare briefing notes, debriefs, reports necessary for the implementation and coordination of Baxnaano activities etc. and ensure follow-up on the represented State progress, as required;</li><li>Notify the PIU/MoLSA of pending and important issues to be raised during social protection meetings</li><li>Represent PIU at meetings, conferences and other relevant events at FMS level. Present PIUs position and safeguard its interest while coordinating with different stakeholders, in a professional manner. Share feedback and reports with PIU after attending the meetings/ events.</li><li>Recommend responses and action plans as a result of interacting with the project&rsquo;s field team and the local community</li><li>Enable the flow of information between all relevant parties, particularly the relevant representatives at counterpart ministries at the represented State, including on potential risks and reporting immediately to the PIU/MoLSA complaints related to the Baxnaano in line with BOOST YOU complaints procedure for the PIU/MoLSA to respond as necessary;</li><li>Act as the State-level focal point for the project Grievance Redress Mechanism (GRM), ensuring timely, transparent, and accountable handling of complaints Maintain proper documentation and reporting of grievances, ensuring confidentiality and data protection.</li><li>Support implementation and operationalization of the GRM in line with project procedures, including intake, registration, tracking, resolution, and feedback to complainants.</li><li>Maintain strict confidentiality of SEA/SH cases and ensure information is shared only on a need-to-know basis in accordance with established protocols.</li><li>Facilitate immediate referral of SEA/SH survivors to appropriate service providers (health, psychosocial, legal) in line with the project&rsquo;s referral pathway.</li><li>Immediately escalate high-risk complaints (including SEA/SH, fraud, or serious social conflict) to PIU following established protocols.</li><li>Assist PIU in organizing and coordinating USR survey related meetings, workshops and training sessions at FMS level.</li><li>Ensure affective planning in consultation with PIU and WFP teams to ensure execution of smooth USR survey activities in the FMS. Affectively coordinate with concerned FMS ministries and district administration to streamline the field activities of USR survey.</li><li>Coordinate deployment of survey teams in the field with concerned stakeholders including facilitation in provision of any approvals, field security and help in arrangement of logistics.</li><li>Collaborate with third party monitoring firms (hired by MoLSA)</li><li>Assist the Operations Team Lead in preparing periodic reports on the field activities and progress of surveys.</li><li>Assist in improving communication and information sharing between different stakeholders.</li><li>Liaise and coordinate with third party monitoring teams and ensure that all activities are carried out as per program design.</li><li>Oversee the activities of third party Beneficiary Communication and Outreach firm in liaison with PIU to ensure that the campaign is conducted as per the agreed SOPs.</li><li>Facilitate third party firms to complete their activities avoiding potential bottlenecks. Suggest improvements to PIU, based on lessons learned in the field.</li><li>In collaboration with relevant representatives at counterpart ministries at the represented State, the PIU/MoLSA, and field teams of WFP, organize and participate in community sensitization and outreach activities to raise awareness to develop greater understanding of BOOST YOU and enhanced community partnership/commitment for the Baxnaano program;</li><li>Ensure that community engagement processes are culturally appropriate, accessible, gender-sensitive, and conflict-sensitive.</li><li>Facilitate regular community consultations, focus group discussions, and outreach sessions to enhance transparency and accountability of project interventions.</li><li>Monitor and report on stakeholder engagement activities, including participation levels, key concerns raised, and responses provided.</li><li>Compile and share reports about particular incidents, events, or updates on important issue for the project</li><li>Participate in trainings, workshops, supervision and implementation support missions conducted by the World Bank, and &lsquo;learning-by-doing&rsquo; opportunities related to the BOOST YOU, as requested by the PIU;</li><li>Perform any other duties as required by PIU/ Operations Team Lead or Project Manager and/or represented FMS authority.</li></ul><p><strong>STATEMENT OF QUALIFICATIONS AND EXPERIENCE:</strong></p><p>The candidates should have the following desired qualifications:</p><ol><li>Bachelor&rsquo;s degree in one of the following areas: development studies, social work, management, public administration or business administration or any other relevant fields;</li><li>Five (5) years of relevant working experience at the national or international level in project/program coordination and management areas including humanitarian organizations, international NGOs, and government.</li><li>Demonstrated knowledge of the Somalia development agenda, mechanisms and principles of social protection, Safety net programs and intra-governmental processes;</li><li>Proven skills and ability in effectively communicating with and coordinating across diverse groups of stakeholders, including project staff, partners, government authorities, private sector, communities as well as beneficiaries;</li><li>Demonstrated experience in stakeholder engagement, community mobilization, or participatory development approaches.</li><li>Excellent communication (spoken and written) skills in Somali and English, including the ability to communicate proactively with key stakeholders, correctly interpret messages from others and respond appropriately. The candidate will demonstrate openness in sharing information;</li></ol><p><strong>CONDUCT OF WORK:</strong></p><p><strong>Reporting: </strong>The State Liaison Officer will directly report on a day-to-day basis to the Project Manager, Baxnaano through the Operations Team Lead. He/she will be expected to closely work with other Baxnaano PIU members for a smooth run of project operations.&nbsp;</p><p><strong>Language: </strong>Reports and other documents shall be submitted in English.</p><p><strong>Duration of assignment: </strong>The successful candidate will work under a one (1) year renewable contract based on competence and approval by the Ministry.</p><p><strong>Facilities to be provided: </strong>MoLSA will provide the office facilities, essential utilities, office services, stationery and office supplies and use of a computer and a printer.</p><p><strong>Location of assignment: </strong>The duty station is in Baidoa, Southwest State of Somalia. The State Liaison Officer will be based at the Ministry of Labor and Social Affairs or Baxnaano Offices.</p>"},{"id":"OP00470628","notice_type":"Request for Expression of Interest","noticedate":"23-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-10T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia, Federal Republic of","project_id":"P507443","project_name":"Building Opportunities and Outcomes in Social Protection and Youth Employment","bid_reference_no":"SO-MOLSA-566399-CS-INDV","bid_description":"Liaison Officer-Jubbaland","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Mogadishu,Somalia","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"dowsaahmed79@gmail.com","contact_name":"Fardosa Abdullahi","contact_organization":"Federal Government of Somalia, Ministry of Labour and Social Affairs","contact_phone_no":"+252612090436","submission_date":"2026-09-23T00:00:00Z","notice_text":"<p><strong>EQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>COUNTRY:</strong> &nbsp;&nbsp;Federal Republic of Somalia (FRS)</p><p><strong>PROJECT ID: </strong>P507443</p><p><strong>Project Name: </strong>Building Opportunities and Outcomes in Social Protection and Youth Employment<strong> </strong></p><p><strong>Post Title: </strong>Jubbaland State Liaison Officer</p><p><strong>Reference No.:</strong>&nbsp;SO-MOLSA-566399-CS-INDV</p><p><strong>Duty Station: </strong>Kismayo, Jubbaland, Somalia</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Jubbaland State Liaison Officer is required by the Federal Government of Somalia (FGS) to support implementation of a World Bank-funded project, Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST You) (P507443). The selected candidate will work for the government&rsquo;s National Social Protection Program (Baxnaano), established in 2019 and housed at the Federal Ministry of Labor and Social Affairs (MoLSA).</p><p><strong>Project Overview</strong></p><p>The project development objective of Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST-YOU) is to enhance economic opportunities and strengthen resilience of the poor and vulnerable. The project directly contributes to strengthening Somalia&rsquo;s social protection system, expanding coverage through its support to the jobs agenda and building greater resilience to shocks through robust adaptive social protection mechanisms. The project applies an integrated approach that moves beneficiaries along a continuum from protection to production.</p><p>The project aims to support the poor and most vulnerable of the population by providing targeted interventions to improve their resilience and prepare for better jobs tomorrow, while providing job opportunities now by addressing key barriers to better income-generating opportunities. The project will reach about 206,000 households in particularly climate-exposed areas, which is equivalent to over 1.2 million individual beneficiaries.</p><p><strong>SELECTION CRITERIA</strong></p><p>Selection shall be based on the qualification and experience of the candidate and followed by an interview. The qualifications, experience and skills should include:</p><p><strong>Academic Qualifications</strong></p><ol><li>Bachelor&rsquo;s degree in one of the following areas: development studies, social work, management, public administration or business administration or any other relevant fields;</li></ol><p><strong>Professional Experience</strong></p><ol><li>Five (5) years of relevant working experience at the national or international level in project/program coordination and management areas including humanitarian organizations, international NGOs, and government.</li><li>Demonstrated knowledge of the Somalia development agenda, mechanisms and principles of social protection, Safety net programs and intra-governmental processes;</li><li>Proven skills and ability in effectively communicating with and coordinating across diverse groups of stakeholders, including project staff, partners, government authorities, private sector, communities as well as beneficiaries;</li><li>Demonstrated experience in stakeholder engagement, community mobilization, or participatory development approaches.</li><li>Excellent communication (spoken and written) skills in Somali and English, including the ability to communicate proactively with key stakeholders, correctly interpret messages from others and respond appropriately.</li></ol><p><strong>DURATION: </strong>The successful candidate will work under a one (1) year renewable contract based on competence and approval by MOLSA, Jubbaland state.</p><p><strong>REPORTING OBLIGATIONS</strong></p><p>The State Liaison Officer will directly report on a day-to-day basis to the Project Manager, Baxnaano through the Operations Team Lead. He/she will be expected to closely work with other Baxnaano PIU members for a smooth run of project operations.&nbsp;</p><p>The Ministry of Labor and Social Affairs, Federal Government of Somalai now invites eligible Individual Consultants to indicate their interest in providing the above-mentioned services. Interested consultants must provide the following: (i) Curriculum Vitae (CV) with 3 references; (ii) copies of certificates of academic qualifications; and (iii) cover letter&nbsp;indicating that they are qualified to perform the services.</p><p><strong>SUBMISSION REQUIREMENTS</strong></p><p>The attention of interested Consultants is drawn to section III, para 3.14,3.16 &amp; 3.17 of the World Bank&rsquo;s&nbsp;<em>Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services, July 2016, revised November 2017, August 2018, November 2020, </em>September<em> 2023</em> and February 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;</p><p><strong>A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations.&nbsp;</strong></p><p>Interested applicants may refer further information including a detailed Terms of Reference in Annex I. &nbsp;&nbsp;&nbsp;</p><p><strong>Deadline</strong>: Expressions of interest and CV must be delivered to this email procurement@baxnaano.gov.so and dg-mole@jubalandstate.so, copy the following emails as well Info@molsa.gov.so, dg-mole@jubalandstate.so Fardosa.Ahmed@baxnaano.gov.so and abdisalan.artan@baxnaano.gov.so, &nbsp;on or before 16:00 hours<strong> 10th &nbsp;October 2026, </strong>with email subject marked clearly as &ldquo;<strong>Jubbaland State Liaison Officer,</strong><strong> </strong><strong>REF:</strong> <strong>SO-MOLSA-566399-CS-INDV</strong></p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Female candidates are encouraged to apply.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Annex I: Terms of Reference</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;State Liaison Officer (Jubbaland)</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Building Opportunities and Outcomes in Social Protection and </strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Youth Employment (P507443) Project</strong></p><p><strong>Background</strong></p><p>Jubbaland State Liaison Officer is required by the Federal Government of Somalia (FGS) to support implementation of a World Bank-funded project, Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST You) (P507443). The selected candidate will work for the government&rsquo;s National Social Protection Program (Baxnaano), established in 2019 and housed at the Federal Ministry of Labor and Social Affairs (MoLSA).</p><p><strong>Project Overview</strong></p><p>The project development objective of Building Opportunities and Outcomes in Social Protection and Youth Employment (BOOST-YOU) is to enhance economic opportunities and strengthen resilience of the poor and vulnerable. The project directly contributes to strengthening Somalia&rsquo;s social protection system, expanding coverage through its support to the jobs agenda and building greater resilience to shocks through robust adaptive social protection mechanisms. The project applies an integrated approach that moves beneficiaries along a continuum from protection to production.</p><p>The project aims to support the poor and most vulnerable of the population by providing targeted interventions to improve their resilience and prepare for better jobs tomorrow, while providing job opportunities now by addressing key barriers to better income-generating opportunities. The project will reach about 206,000 households in particularly climate-exposed areas, which is equivalent to over 1.2 million individual beneficiaries.</p><p>The program supports poor and vulnerable households through following components:</p><p><strong>Component 1: Connecting Youth and Women to Better Jobs Today: </strong>Supports 28,000 youth (60% women &amp; 5% disable persons) in urban areas with limited job opportunities and prolonged periods of inactivity, benefit from economic inclusion activities (wage and self-employment activities). contributing directly creating jobs and strengthening households&rsquo; resilience.</p><p><strong>C</strong><strong>o</strong><strong>mponent 2: Investing in People for Better Jobs Tomorrow: </strong>The component will deliver regular cash transfers to 50,000 of the poorest households to meet basic needs, enhance climate-challenged food security, and prevent negative coping strategies during climate shocks, which in turn helps safeguard the human capital necessary for productive participation in the labor force. Approximately 10,000 shock affected poor and vulnerable households will be supported with emergency cash transfers as part of a contingent financing arrangement in case of climate shocks. 30,000 pregnant women and mothers with children under two will receive health- and nutrition-linked co-responsibility cash transfers (CCTs) to promote maternal and child health, reduce malnutrition, and improve early childhood development, strengthening the human capital necessary for future workforce productivity whilst mitigating adverse climate impacts. An early response-Health and Nutrition CCT will support 83,000 shock affected households with pregnant women and mothers with children under two to reduce the prevalence of significant acute malnutrition and infant mortality in drought affected prioritized districts. An education CCT program will target 5,000 children from the poorest and most climate-affected households, helping build the foundation required for long-term employability by increasing school enrollment and attendance.</p><p><strong>Component 3: Adaptive Social Protection Systems and Project Management: </strong>Supports enhancement of an adaptive social protection system, the National Socio-Economic Survey and project management including institutional capacity building for MoLSA. The objective of this support is to create a robust, efficient, and responsive social protection infrastructure. By strengthening institutional capacity, enhancing data management, strengthening the delivery system and registering the population in the USR, this component lays the foundation for sustainable and effective social protection and multisectoral poverty targeted investments. Under this component National Socio-economic Survey (NSES) will register 12 million people in Somalia in the USR collecting socio-economic data to inform targeting for pro-poor programs in the country. The component also provides support for effective project management, capacity building and oversight of project activities.</p><p><strong>OBJECTIVE AND SCOPE OF WORK:</strong></p><p>The State Liaison Officer will report to the Operations Team Lead and will be responsible for the implementation and delivery of all activities supported under the project. The State Liaison Officer must ensure compliance with operational protocols in the Baxnaano Operations Manual and accompanying guidelines, ensuring close coordination with relevant ministries, authorities, agencies and departments on day-to-day operational issues.</p><p>The Liaison Officer will help to coordinate the implementation of project activities at the State level between the PIU of the MoLSA, WFP and the relevant representatives of the Federal Member State (FMS), as well as other consultants (individuals and firms), hired under the project to facilitate effective delivery of project activities to achieve the overall project objectives. The Liaison Officer will work closely with the MOLSA PIU team and other implementing partners.</p><p>&nbsp;</p><p>Under the leadership of the Operations Team Lead, duties of the State Liaison Officer will include:</p><p>&nbsp;</p><ul><li>Serve as a primary point of contact and sensitize the relevant representatives at counterpart ministries at the FMS level, community-based organizations (CBOs) and other social partners on social protection to create support for the project at the FMS level</li><li>Facilitate cooperation between the MoLSA/FGS and the relevant representatives at counterpart ministries at the FMS level on project activities and communicate priorities and concerns of the represented State to the PIU at the FGS level;</li><li>Coordinate with the relevant representatives at counterpart ministries at the State, the PIU/MoLSA, and field teams of WFP, as well as the CBOs and other social protection partners to support the implementation of the project in his/her state;</li><li>Attend and organize relevant meetings to support the implementation and coordination of Baxnaano activities, as requested by the representing State and the PIU/MoLSA</li><li>Prepare briefing notes, debriefs, reports necessary for the implementation and coordination of Baxnaano activities etc. and ensure follow-up on the represented State progress, as required;</li><li>Notify the PIU/MoLSA of pending and important issues to be raised during social protection meetings</li><li>Represent PIU at meetings, conferences and other relevant events at FMS level. Present PIUs position and safeguard its interest while coordinating with different stakeholders, in a professional manner. Share feedback and reports with PIU after attending the meetings/ events.</li><li>Recommend responses and action plans as a result of interacting with the project&rsquo;s field team and the local community</li><li>Enable the flow of information between all relevant parties, particularly the relevant representatives at counterpart ministries at the represented State, including on potential risks and reporting immediately to the PIU/MoLSA complaints related to the Baxnaano in line with BOOST YOU complaints procedure for the PIU/MoLSA to respond as necessary;</li><li>Act as the State-level focal point for the project Grievance Redress Mechanism (GRM), ensuring timely, transparent, and accountable handling of complaints Maintain proper documentation and reporting of grievances, ensuring confidentiality and data protection.</li><li>Support implementation and operationalization of the GRM in line with project procedures, including intake, registration, tracking, resolution, and feedback to complainants.</li><li>Maintain strict confidentiality of SEA/SH cases and ensure information is shared only on a need-to-know basis in accordance with established protocols.</li><li>Facilitate immediate referral of SEA/SH survivors to appropriate service providers (health, psychosocial, legal) in line with the project&rsquo;s referral pathway.</li><li>Immediately escalate high-risk complaints (including SEA/SH, fraud, or serious social conflict) to PIU following established protocols.</li><li>Assist PIU in organizing and coordinating USR survey related meetings, workshops and training sessions at FMS level.</li><li>Ensure affective planning in consultation with PIU and WFP teams to ensure execution of smooth USR survey activities in the FMS. Affectively coordinate with concerned FMS ministries and district administration to streamline the field activities of USR survey.</li><li>Coordinate deployment of survey teams in the field with concerned stakeholders including facilitation in provision of any approvals, field security and help in arrangement of logistics.</li><li>Collaborate with third party monitoring firms (hired by MoLSA)</li><li>Assist the Operations Team Lead in preparing periodic reports on the field activities and progress of surveys.</li><li>Assist in improving communication and information sharing between different stakeholders.</li><li>Liaise and coordinate with third party monitoring teams and ensure that all activities are carried out as per program design.</li><li>Oversee the activities of third party Beneficiary Communication and Outreach firm in liaison with PIU to ensure that the campaign is conducted as per the agreed SOPs.</li><li>Facilitate third party firms to complete their activities avoiding potential bottlenecks. Suggest improvements to PIU, based on lessons learned in the field.</li><li>In collaboration with relevant representatives at counterpart ministries at the represented State, the PIU/MoLSA, and field teams of WFP, organize and participate in community sensitization and outreach activities to raise awareness to develop greater understanding of BOOST YOU and enhanced community partnership/commitment for the Baxnaano program;</li><li>Ensure that community engagement processes are culturally appropriate, accessible, gender-sensitive, and conflict-sensitive.</li><li>Facilitate regular community consultations, focus group discussions, and outreach sessions to enhance transparency and accountability of project interventions.</li><li>Monitor and report on stakeholder engagement activities, including participation levels, key concerns raised, and responses provided.</li><li>Compile and share reports about particular incidents, events, or updates on important issue for the project</li><li>Participate in trainings, workshops, supervision and implementation support missions conducted by the World Bank, and &lsquo;learning-by-doing&rsquo; opportunities related to the BOOST YOU, as requested by the PIU;</li><li>Perform any other duties as required by PIU/ Operations Team Lead or Project Manager and/or represented FMS authority.</li></ul><p><strong>STATEMENT OF QUALIFICATIONS AND EXPERIENCE:</strong></p><p>The candidates should have the following desired qualifications:</p><ol><li>Bachelor&rsquo;s degree in one of the following areas: development studies, social work, management, public administration or business administration or any other relevant fields;</li><li>Five (5) years of relevant working experience at the national or international level in project/program coordination and management areas including humanitarian organizations, international NGOs, and government.</li><li>Demonstrated knowledge of the Somalia development agenda, mechanisms and principles of social protection, Safety net programs and intra-governmental processes;</li><li>Proven skills and ability in effectively communicating with and coordinating across diverse groups of stakeholders, including project staff, partners, government authorities, private sector, communities as well as beneficiaries;</li><li>Demonstrated experience in stakeholder engagement, community mobilization, or participatory development approaches.</li><li>Excellent communication (spoken and written) skills in Somali and English, including the ability to communicate proactively with key stakeholders, correctly interpret messages from others and respond appropriately. The candidate will demonstrate openness in sharing information;</li></ol><p><strong>CONDUCT OF WORK:</strong></p><p><strong>Reporting: </strong>The State Liaison Officer will directly report on a day-to-day basis to the Project Manager, Baxnaano through the Operations Team Lead. He/she will be expected to closely work with other Baxnaano PIU members for a smooth run of project operations.&nbsp;</p><p><strong>Language: </strong>Reports and other documents shall be submitted in English.</p><p><strong>Duration of assignment: </strong>The successful candidate will work under a one (1) year renewable contract based on competence and approval by the Ministry.</p><p><strong>Facilities to be provided: </strong>MoLSA will provide the office facilities, essential utilities, office services, stationery and office supplies and use of a computer and a printer.</p><p><strong>Location of assignment: </strong>The duty station is in Kismayo, Jubbaland State of Somalia. The State Liaison Officer will be based at the Ministry of Labor and Social Affairs or Baxnaano Offices.</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00470176","notice_type":"Request for Expression of Interest","noticedate":"21-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-24T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"China","project_id":"P173746","project_name":"China Emerging Infectious Diseases Prevention, Preparedness and Response Project","bid_reference_no":"HN-FC-58","bid_description":"Consulting Services for Construction Supervision of the Terrestrial Wildlife Disease Surveillance System.（1.3.1）","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Hainan, China","contact_ctry_name":"China","contact_email":"qjklyzxmb@163.com","contact_name":"Mr. Pan","contact_organization":"Hainan Provincial Forestry Bureau","contact_phone_no":"0898-65390353","submission_date":"2026-09-21T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSIONS OF INTEREST</p><p>(Consulting Services &ndash; Selection of Firms)</p><p>PEOPLE&rsquo;S REPUBLIC OF CHINA</p><p>World Bank Loan Hainan Project for Prevention, Preparedness and Response to Emerging Infectious Diseases (Global One Health Hainan Demonstration Project)</p><p>Loan No.: 9084-CN</p><p>Procurement No.: 0733-26094116</p><p>Assignment Title: Consulting Services for Supervision of the Construction of the Terrestrial Wildlife Disease Surveillance System</p><p>Contract No.: HN-FC-58</p><p>The Government of the People&rsquo;s Republic of China has received a loan from the World Bank to finance the World Bank Loan Hainan Project for Prevention, Preparedness and Response to Emerging Infectious Diseases (Global One Health Hainan Demonstration Project), and intends to apply part of the proceeds of the loan to consulting services.</p><p>The main scope of the consulting services (hereinafter referred to as the &ldquo;Services&rdquo;) includes quality, schedule, cost, and safety control and assurance for all works under the supervision of all 10 monitoring stations; contract management, information management and work coordination; preliminary review of engineering consultations and negotiations; and measurement of completed works for payment of progress payments. The specific scope of services is as follows:</p><ol><li>The Chief Supervision Engineer shall be responsible for preparing the supervision plan and submitting it to the Client in a timely manner.</li><li>Assist the Client in preparing for the commencement of construction.</li><li>Review and approve the contractor&rsquo;s construction organization plan and construction drawings, and prepare targeted supervision rules.</li><li>Coordinate the cooperation among different contractors and trades.</li><li>Verify the certificates of conformity, quality assurance certificates, test reports, and other relevant documents for materials and equipment; verify the lists of materials and equipment submitted by the contractor; inspect the specifications, quality, and quantities of materials, components, and equipment used in the works; and conduct sampling and retesting of materials with quality concerns. Unqualified materials shall not be used in the works.</li><li>Preside over the review of engineering drawings; within the scope authorized by the Client, sign and confirm engineering design changes and site instructions/variations; regularly preside over weekly supervision meetings and prepare the meeting minutes.</li><li>Review and approve the construction schedule, supervise the progress of construction, and supervise the contractor&rsquo;s compliance with safety requirements. Be responsible for inspecting the quality of the works, conducting witnessed sampling and testing, and recording the test results.</li><li>Organize the preliminary inspection of the works and submit rectification recommendations to the Client, and ultimately participate in the completion acceptance of the works.</li><li>Supervise the performance of the construction contract.</li><li>In accordance with the payment provisions of the construction contract, calculate the quantity of works completed during the month based on the monthly progress plan, and have the Chief Supervision Engineer issue the supporting documentation for the advance payment. Submit monthly supervision reports on a regular basis and maintain supervision logs. Where necessary, prepare special reports within the scope of supervision services, including quality analysis reports, on an ad hoc basis.</li><li>Regularly inspect the contractor&rsquo;s implementation of the specific arrangements and measures under the Project&rsquo;s Environmental and Social Management Plan (ESMP), record the implementation in the supervision logs, and provide periodic summaries in the monthly supervision reports.</li><li>Supervise the construction contractor in carrying out the completion acceptance of the works in accordance with the contract.</li><li>Implement dynamic management of the supervision logs throughout the supervision process and establish a supervision work register system for supervision records and documents.</li><li>Report special or exceptional issues to the Client in a timely manner.</li><li>Be responsible for organizing and completing the procedures for completion acceptance and assist the Client in coordinating with relevant government authorities.</li></ol><p>For details, please refer to the Terms of Reference (TOR).</p><p>The estimated total input for this consulting service is 66 person-months. The consultants&rsquo; services shall commence from the date on which the contract is signed and becomes effective and continue until completion acceptance of the construction project.</p><p>The Terms of Reference (TOR) for this consulting service are attached to this Request for Expressions of Interest.</p><p>Hainan Provincial Forestry Bureau (hereinafter referred to as the &ldquo;Client&rdquo;) now invites eligible consulting firms (the &ldquo;Consultants&rdquo;) to express their interest in providing the consulting services. Interested Consultants shall provide relevant supporting documents in accordance with the following requirements. The Expression of Interest (i.e., the submission) shall include, at a minimum:</p><ol><li>A brief introduction to the consulting firm, including its organizational structure, staffing, etc.</li><li>A Power of Attorney, identification documents of the legal representative and the authorized representative. If the Consultant is a joint venture, a joint venture agreement (in a format of the Consultant&rsquo;s own choosing) shall also be provided.</li><li>The consulting firm shall have independent legal person status and a valid business license. The Consultant shall provide a copy of its business license or Certificate of Legal Person of a Public Institution.</li><li>If the Consultant is a state-owned enterprise or public institution, it shall provide its articles of association and the audited financial audit report and financial statements for 2025, including at least the balance sheet, cash flow statement, and income statement/profit and loss statement.</li><li>The Consultant shall possess a Grade B or above qualification for supervision of building construction projects issued by the competent construction administrative authority; or, in accordance with the Notice of the Ministry of Housing and Urban-Rural Development on Issuing the Reform Plan for the Qualification Management System for Construction Enterprises (Jianshi [2020] No. 94), shall have obtained the corresponding qualification under the new qualification certificate system. The Consultant shall provide a copy of the Grade B or above qualification certificate for supervision of building construction projects issued by the competent construction administrative authority, or relevant supporting documents demonstrating that the corresponding qualification has been obtained under the new qualification certificate system in accordance with the above Notice.</li><li>The consulting firm shall possess the Hainan Provincial Construction Enterprise Integrity Record Manual. The Consultant shall provide the page of the Hainan Provincial Construction Enterprise Integrity Record Manual generated by the information platform, duly affixed with the official seal of the entity as required, or equivalent supporting documents.</li><li>The consulting firm shall have undertaken and successfully completed at least three (3) supervision projects for building construction works during the past three years (from January 1, 2023 to the deadline for submission of Expressions of Interest), with each supervision contract having a contract value of not less than RMB 400,000. Copies of the key pages of the relevant supervision contracts for building construction works shall be provided, including at least the contract cover page, contract date, scope of services, contract amount, contract signature and seal page, and other key information.</li><li>Any other information that the Consultant considers necessary to provide (if any).</li></ol><p>At this stage, no evaluation of the Consultants will be conducted. The Client will select one (1) consulting firm with the best qualifications and relevant experience from among all consulting firms that have submitted Expressions of Interest, and invite the selected firm to submit its Technical and Financial Proposals and enter into negotiations.</p><p>Interested Consultants should take note of the provisions of paragraphs 3.14, 3.16, and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers (the &ldquo;Procurement Regulations&rdquo;) (November 2020), which set forth the World Bank&rsquo;s policy on conflicts of interest.</p><p>Consulting firms may associate with other firms when submitting Expressions of Interest to enhance their qualifications, but should clearly indicate whether such association is in the form of a joint venture and/or subcontracting arrangement. If a joint venture is formed, each member of the joint venture shall meet the &ldquo;Qualification Requirements for Consulting Firms&rdquo; specified in this Request for Expressions of Interest. If the joint venture is selected, all members of the joint venture and its subcontracted consultants shall be jointly and severally liable for the entire Contract.</p><p>The Consultant will be selected using the Consultant&rsquo;s Qualifications Selection (CQS) method specified in the Procurement Regulations.</p><p>Further information may be obtained from China CNTIC Tendering Co., Ltd. during working hours, from 9:00 a.m. to 5:00 p.m. on working days.</p><p>The Expression of Interest must be submitted in writing before 17:00 on September 17, 2026 (the deadline for submission of Expressions of Interest), either by hand delivery, mail, or email, to Room 1817, 18th Floor, No. 59, Middle Section of East Third Ring Road, Chaoyang District, Beijing.</p><p>Consultants are recommended to submit a hard copy of the Expression of Interest. If submitted in hard copy (bound and sealed), one (1) original and two (2) copies of the Expression of Interest shall be submitted, together with a USB flash drive containing a scanned PDF version of the duly signed and stamped original and an editable Word version (with contents consistent with the scanned original). In the event of any discrepancy between the electronic version and the hard copy, the hard copy shall prevail.</p><p>If submitted by email, please send a scanned PDF version of the duly signed and stamped original Expression of Interest and an editable Word version (with contents consistent with the scanned original).</p><p>Client: Hainan Provincial Forestry Bureau</p><p>Contact Person: Mr. Pan</p><p>Address: Hainan Provincial Forestry Bureau, No. 80 Haifu Road, Haikou, Hainan Province</p><p>Tel.: 0898-65390353</p><p>Fax: N/A</p><p>Email: qjklyzxmb@163.com</p><p>Procurement Agent: China CNTIC Tendering Co., Ltd.</p><p>Contact Persons: Yang Gengxu, Liu Shuang</p><p>Address: Room 1817, 18th Floor, No. 59, Middle Section of East Third Ring Road, Chaoyang District, Beijing</p><p>Tel.: 010-87945198-512, 010-87945198-509</p><p>Fax: 010-87945235</p><p>Email: yanggx@ck.citic.com, liushuang@ck.citic.com</p><p>Address for Submission of Expressions of Interest:</p><p>Submission Method 1: Hand Delivery</p><p>Address: Room 1817, 18th Floor, No. 59, Middle Section of East Third Ring Road, Chaoyang District, Beijing</p><p>Submission Method 2: By Mail</p><p>Address: Room 1817, 18th Floor, No. 59, Middle Section of East Third Ring Road, Chaoyang District, Beijing</p><p>Submission Method 3: By Email</p><p>Email addresses: yanggx@ck.citic.com; liushuang@ck.citic.com</p><p>Any questions or complaints concerning the procurement process or contract award shall be submitted in writing to the Client and the Procurement Agent at the following email addresses: qjklyzxmb@163.com, yanggx@ck.citic.com, and liushuang@ck.citic.com. Bidders may also copy the World Bank on any correspondence concerning questions or complaints submitted to the Client and the Procurement Agent at fyang2@worldbank.org and jguo@worldbank.org.</p>"},{"id":"OP00469679","notice_type":"Request for Expression of Interest","noticedate":"20-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-09T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P181237","project_name":"Strengthening Public Financial Management II Project","bid_reference_no":"FM-DOFA-572432-CS-INDV","bid_description":"FMIS Advisor 2","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"FSM National Government PO Box PS 158 Palikir Pohnpei 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"osbert.atusaasiire@dofa.gov.fm","contact_name":"Osbert Atusaasiire","contact_organization":"Department of Finance and Administration","contact_phone_no":"3202645","contact_web_url":"fsmsofa@mail.fm","submission_date":"2026-09-20T00:00:00Z","notice_text":"<p><strong>FEDERATED STATES OF MICRONESIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:217px\"><p>Country</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:1px solid #a6a6a6; vertical-align:top; width:406px\"><p>Federated States of Micronesia</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Project for Strengthening Public Financial Management II (P181237)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Project Implementing Agency / Client</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Department of Finance and Administration (DOFA)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Assignment Title</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>FMIS Advisor</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Individual Consultant Selection</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Contract Type</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>Time Based&nbsp;</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Reference No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>FM-DOFA-572432-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Credit/Grant No.</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>IDA-E4120</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #a6a6a6; border-left:1px solid #a6a6a6; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:217px\"><p>Deadline for Submission</p></td><td style=\"border-bottom:1px solid #a6a6a6; border-left:none; border-right:1px solid #a6a6a6; border-top:none; vertical-align:top; width:406px\"><p>October 9, 2026</p></td></tr></tbody></table><p>The Government of The Federated States of Micronesia (FSM) has received financing from the World Bank toward the cost of <strong>the Strengthening Public Financial Management II Project (P181237)</strong> and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) involve providing full-time technical advisory, implementation oversight and quality assurance support for Component 2 &ndash; Expanded Core Financial Management Information Systems (FMIS) of the PFM II Project.</p><p>The FMIS Advisor will support the Government in the continued rollout, expansion, effective use and institutionalization of the FMIS across National Government Departments and Agencies and, where applicable, State Governments. The assignment will focus on ensuring that FMIS implementation is aligned with Government&#39;s public financial management requirements, business processes, controls and reporting needs, while strengthening Government capacity and reducing reliance on external support.</p><p>The key responsibilities will include, but not be limited to:</p><ul><li>Provide technical advice and coordination support for the FMIS rollout, expansion and related PFM reforms;</li><li>Support FMIS readiness, implementation, testing, data migration, business process review and quality assurance;</li><li>Review and monitor FMIS vendor deliverables, system documentation, implementation progress, issues and risks;</li><li>&nbsp;Support training, knowledge transfer, capacity building and the development of sustainable Government FMIS support arrangements; and</li><li>Provide technical inputs to FMIS-related procurement, contracts, technical specifications, implementation teams and governance structures.</li></ul><p>The assignment will be based in <strong>Palikir, Pohnpei, Federated States of Micronesia</strong>, with travel to the four State Governments as required. The assignment is expected to be <strong>full-time for twenty-four (24) months</strong>, with an anticipated start date as soon as possible, subject to completion of the selection and contracting process.</p><p>The detailed Terms of Reference (TOR) for the assignment can be found at the Department of Finance and Administration website:<strong> </strong><strong>https://dofa.gov.fm</strong>, as part of this REOI, or can be obtained at the address given below.</p><p>The Department of Finance and Administration now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Consultants should submit a <strong>Curriculum Vitae (CV)</strong> describing their qualifications, professional experience, experience in similar assignments and relevant experience in similar institutional or country contexts together with a <strong>cover letter&nbsp;</strong>outlining their interest in the assignment and suitability for the position.</p><p>The criteria for selecting the Consultant are:</p><p><strong>Mandatory&nbsp;Requirements:</strong></p><p>The Consultant shall possess:</p><ol><li>A minimum Master&#39;s degree in public finance, financial management, accounting, information systems, business administration, economics, public administration, or related field from a recognized university;</li><li>At least seven (7) years of professional experience in public financial management, including demonstrated experience in PFM reform, financial management systems or related public sector reform activities at a senior professional level; and</li><li>Functional hands-on experience with FreeBalance for at least one government FMIS project, including experience in implementation, rollout, upgrade, migration, testing, quality assurance and/or operational support; and</li><li>A proven track record in managing or supporting large-scale ERP/IFMIS/FMIS implementation activities, including system build or configuration, testing, rollout and quality assurance, preferably in developing countries.</li></ol><p><strong>Desirable</strong>&nbsp;<strong>:</strong></p><ol><li>Demonstrated experience in business process review and re-engineering, data migration, testing, user acceptance testing and/or operational acceptance testing for an FMIS or ERP;</li><li>Experience in vendor management and technical quality assurance, including reviewing FMIS implementation deliverables, system documentation, technical specifications and implementation plans;</li><li>Experience in developing and implementing FMIS sustainability, knowledge-transfer and transition arrangements to strengthen government ownership and reduce reliance on external consultants; and</li><li>Experience working with government institutions in Asia - Pacific island countries and/or similarly remote Small Island Developing States (SIDS), including experience coordinating multidisciplinary and multicultural stakeholders.</li></ol><p>The attention of interested Consultants is drawn to <strong>paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Seventh Edition, September 2025</strong> (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>Further information can be obtained at the address below during office hours 08:00 to 17:00 hours, Pohnpei Time.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail only&nbsp;<strong>preferably by 5pm Pohnpei Time, October 9, 2026. </strong>Expressions of Interest must be submitted&nbsp;<strong>by email only</strong>&nbsp;to the following addresses:</p><p>Attn:&nbsp;Project Manager PFM II</p><p>Department of Finance and Administration</p><p>P.O Box PS-158</p><p>Palikir, Pohnpei, Federated States of Micronesia</p><p>Email: <strong>osbert.atusaasiire@dofa.gov.fm</strong></p><p>And cc: <strong>arrio.abello@dofa.gov.fm</strong></p><p>&nbsp;</p><p><strong>ANNEX 1: TERMS OF REFERENCE</strong></p><p><strong>FEDERATED STATES OF MICRONESIA</strong></p><p><strong>Project for Strengthening Public Financial Management II (P181237)</strong></p><p><strong>Terms of Reference &ndash; Financial Management Information Systems Advisor</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:628px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:25px; vertical-align:top; width:150px\"><p><strong>Title: </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:25px; vertical-align:top; width:478px\"><p><strong>Financial Management Information Systems Advisor</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>Location:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:478px\"><p>Palikir, National Government of the Federated States of Micronesia - Department of Finance and Administration (DoFA)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:150px\"><p>Duration:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:22px; vertical-align:top; width:478px\"><p>Initial contract duration of 2 years (full time) with the potential to extend based on available finance and satisfactory performance</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:5px; vertical-align:top; width:150px\"><p>Tentative Start Date:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:5px; vertical-align:top; width:478px\"><p>As soon as possible</p></td></tr></tbody></table><p><strong>A. BACKGROUND</strong></p><p>The Government of the Federated States of Micronesia (FSM), with support from the World Bank, are working to improve fiscal management practices and increase fiscal transparency at the National Government level through the Strengthening Public Financial Management II Project (P181237).&nbsp; The project builds upon key public financial management (PFM) achieved under the previous PFM I project and intends to institutionalize those achievements by:</p><ul><li>Expanding the core financial management information system (FMIS) to line departments and agencies</li><li>Improve systems and process in budget formulation and execution, procurement, treasury functions, internal controls, and reporting</li><li>Strengthening technical capacities of the Department of Finance &amp; Administration (DoFA)</li><li>Review existing PFM legislation to identify changes to support transition to a digital PFM environment</li></ul><p>The project components are: (i) improved fiscal management practices and controls, (ii) expanded core FMIS, (iii) enhanced human resource capacity, communications and change management, and (iv) project management.</p><p><strong>B. PURPOSE AND OBJECTIVES OF THE ROLE </strong></p><p><strong>Purpose of the assignment</strong></p><p>The Consultant primarily support activities under Component 2- Expanded Core Financial Management Information Systems. This component aims at supporting increasing efficiency and automation of public finance processes through the expanded use of the Financial Management Information System (FMIS) implemented under PFM I to additional Government Departments, Agencies and State Governments <em>(where applicable)</em>.</p><p><strong>Objective of the assignment</strong></p><p>The objective of this role is to provide technical support and advisory services to the implementation of public financial management reforms with specific focus on the use of FMIS. With the support of the National Treasury team, the Consultant will drive the further adoption and expansion Financial Management Information System (FMIS) capabilities across core Treasury processes and support the decentralization of the system.</p><p><strong>C. SCOPE OF SERVICES</strong></p><ol><li>The scope of responsibility will cover:<ul><li>Roll-out and deepen the use of FMIS, including roll out of modules such as fixed assets, payroll, budget and e-procurement.</li><li>Support for the PFM reforms in general, development and implementation of PFM policies and procedures, capacity building for staff, quality control for policy and general pronouncements and presentations/reports, monitoring and evaluation and other related matters</li></ul></li><li>The FMIS Advisor&rsquo;s key activities relating above responsibilities will include the following:&nbsp;<ul><li>Provide technical assistance to the Secretary Department of Finance and Administration (DoFA)and the Assistant Secretary Treasury Comptroller to coordinate and guide the implementation of public financial management reforms and in resolving issues pertaining to the FMIS roll-out. This coordination will involve various streams of activities necessary to make the roll out of the FMIS successful including but not limited to, Training, Acceptance Testing, data migration, Change Management, User authorizations/ security in FMIS and business process reengineering.</li><li>Work with the PFMII ICT Advisor to ensure that the local area network and the wide area network supports the efficient and effective use of the FMIS system.</li><li>In line with the FMIS rollout strategy, assess readiness for expansion of the FMIS system to Departments and Agencies in terms of institutional structures, staff availability, capacity and skills, financial management processes and systems (manual or otherwise) and controls, site infrastructure and power, implementation risks and make very specific recommendations to address gaps.</li><li>Business Process Re-engineering: provide technical support to review PFM processes and Government-on-Line business requirements to determine any necessary validation or re-engineering.</li><li>Implementation:&nbsp;&nbsp; prepare and update the Project Plan, the training content/materials and plan, and the change management plan to ensure that the weaknesses and recommendations in the original or modified form, are carried out and implemented.</li><li>Quality Assurance and OAT (Operational Acceptance Testing): Carry out quality review and assurance to the FMIS Implementation phases including but not limited to the following:<ul><li>Data collection, validation and conversion</li><li>Equipment and solution deployment</li><li>Site and infrastructure preparation</li><li>Testing scripts and User Acceptance testing</li><li>Training (including training materials) and change management</li><li>Handling of implementation issues</li><li>Participation in implementation teams/working groups/ steering committee meetings.</li></ul></li></ul></li><li>Coordinate with Budget Department to ensure an FMIS system supports the requirements of budgeting and payroll.</li><li>Provide the necessary support and guidance to the Assistant Secretary Treasury in order to ensure that all system documentation expected from the FMIS Supplier is delivered or developed including establishing criteria to be applied to review and evaluate all such documents.</li><li>Monitoring: the Advisor will draw-up a monitoring framework and periodically monitor and assess the state of implementation particularly focusing on qualitative improvements; the Advisor will review improvements in institutional capacity and training, overall adaptation and use of the FMIS, improvements in financial management processes and systems controls and reporting, and improvements in all aspects of the PFM necessary to meet the overall objectives. Resulting from this process, the Advisor will:<ul><li>Determine areas that may lag or new areas that require attention and make recommendations for improvements</li><li>Raise issues (technical or otherwise) that may impede progress</li></ul></li><li>The Advisor will develop a plan by which the Government-on-Line will gradually take over full support of its PFM Systems to reduce the Government-on-LIne dependency on external consultants, increase ownership and allow National and State Treasury Staff to manage with the limited resources. Suitable officers / employees should be identified and trained to make this happen. This plan shall be discussed with the Secretary DoFA and approved for implementation. In drawing up this plan, the Advisor will among others:<ul><li>Assess the state of readiness of National and State Government to take over in terms of staff capacity.</li><li>Determine actions and time required to cover the gaps for example in terms of training, staff recruitment, etc.</li><li>Determine work plans and milestones to implement these actions. The work plan shall include monitoring meetings with the Steering Committee. The Advisor will help to monitor the implementation of the agreed plan.</li></ul></li><li>Advise on suitable Governance structures required for the management of all the implementation phases of the FMIS.</li><li>Throughout the duration of the Project, assisting the Assistant Secretary Treasury to identify risks to the FMIS rollout activities and formulate strategies to mitigate such risks.</li><li>Where necessary, review for quality and alignment, technical specifications or Terms of reference to be used in the procurement of PFM related resources.</li><li>Provide technical inputs to the IFMIS implementation contracts, procurements and financial management teams</li></ol><p><strong>Key Deliverables</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:396px\"><p><strong>Key Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:189px\"><p><strong>Timing/Frequency</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:396px\"><p><strong>FMIS Technical Advisory and Rollout Support:</strong> Provide technical advice and planning support for FMIS rollout to Departments, Agencies, and National and State Governments, including rollout plans, readiness assessments, technical support submissions and recommendations. Support progress towards <strong>IR-4 &ndash; FMIS rolled out to sectoral Departments</strong>.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:189px\"><p>Throughout the assignment; plans and technical submissions updated or provided as required.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:396px\"><p><strong>FMIS Enhancement and Quality Assurance Support:</strong> Provide technical support and quality assurance for FMIS enhancements, interfaces and additional modules, including fixed assets, payroll, budget and e-procurement, as applicable. Support business process review, data migration, testing and review of vendor deliverables. The Advisor shall provide technical advice, oversight and quality assurance and shall not be responsible for system development, configuration or delivery, which remains the responsibility of the FMIS vendor.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:189px\"><p>Throughout the assignment, in accordance with the approved implementation plan.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:396px\"><p><strong>FMIS Monitoring and Reporting:</strong> Prepare technical progress reports covering FMIS rollout, implementation, issues, risks and recommendations, including technical inputs supporting <strong>IR-4</strong> and <strong>PDO-2 &ndash; Number of key fiscal documents made publicly available by DoFA within the timeline specified in PEFA Indicator PI-9.1</strong>.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:189px\"><p>Monthly; annually; and final report before completion of the assignment.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:396px\"><p>Capacity Building, Risk Management and Sustainability: Support FMIS training and knowledge transfer; prepare and update the FMIS Risk Management Plan; and prepare and update an FMIS Sustainability and Transition Plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:189px\"><p>Throughout the assignment; Risk Plan within 3 months and updated periodically; Sustainability Plan within 6 months, updated annually and finalized before completion.</p></td></tr></tbody></table><p><strong>D. QUALIFICATION AND EXPERIENCE </strong></p><p>The prospective consultant shall be a highly experienced practitioner with a proven record in FMIS Implementation in the public sector internationally. The position will require cross-cultural interpersonal skills to coordinate and negotiate resources across multiple stakeholders in order to achieve positive project outcomes.&nbsp;</p><p><strong>Mandatory&nbsp; </strong></p><ol><li>Minimum Master&#39;s degree in public finance, financial management, accounting, information systems, business administration, economics, public administration or related field from a recognized university.</li><li>Functional hands-on experience with FreeBalance for at least one government FMIS project.</li><li>At least 7 years&rsquo; experience in the area of public financial management, including experience with PFM reform processes at a senior level either with Government or large international organizations.</li><li>Experience in post conflict environments is desirable.</li></ol><p><strong>Desirable</strong> <strong>Qualifications and Experience: </strong></p><ol><li>Strong analytical, oral and written communication skills, report writing, and the ability to write for and present to a variety of stakeholder hierarchies;</li><li>A proven track record of successful management of application build, testing, implementation and quality assurance activities of large-scale ERP/IFMIS systems in developing countries is required.</li><li>Fluency in English.</li><li>Experience working in the Pacific.</li></ol><p><strong>F. DURATION, LOCATION and CONDITIONS of ASSIGNMENT</strong></p><ul><li>The Consultant will report of the Assistant Secretary for Treasury.</li><li>This is a full-time position for an initial period of Twenty Four&nbsp;(24) Months, based in Palikir, Pohnpei, and may be extended based on satisfactory performance and availability of funding.</li><li>Domestic travel may be required from time to time, including overnight travel away from the home office.</li><li>The Department of Finance and Administration will provide office space, general office supplies, and office equipment.</li></ul><p><strong>ANNEX B: CONSULTANT&rsquo;S REPORTING OBLIGATIONS</strong></p><p>The Advisor shall submit the following reports during the 24-month assignment:</p><ol><li><strong>Monthly Progress Reports:</strong> The FMIS Advisor shall prepare and submit a concise monthly progress report covering activities undertaken during the reporting period, progress against the approved FMIS implementation and rollout plan, progress toward relevant PFM II Results Framework indicators, particularly PDO-2 and IR-4, key achievements, emerging issues, risks, corrective actions and matters requiring clarification or decision by the Client.</li><li><strong>Annual Progress Reports:</strong> The FMIS Advisor shall prepare and submit an annual progress report summarizing progress during each 12-month period of the assignment. The report shall highlight achievements against the approved FMIS implementation and rollout plan, progress toward relevant PFM II Results Framework targets, particularly PDO-2 &ndash; Number of key fiscal documents made publicly available by DoFA within the timeline specified in PEFA Indicator PI-9.1 and IR-4 &ndash; FMIS rolled out to sectoral Departments, emerging issues and risks, actions taken to address implementation constraints, and recommendations to support successful FMIS implementation and sustainability.</li><li><strong>Final Report:</strong> Before the end of the 24-month assignment, the FMIS Advisor shall submit a final report documenting all major activities undertaken, achievements against the FMIS implementation and rollout plan, progress against relevant PFM II Results Framework indicators, particularly PDO-2 and IR-4, outstanding issues and risks, lessons learned, knowledge transfer and capacity-building outcomes, sustainability arrangements, and recommendations for the continued implementation and institutionalization of the FMIS.</li></ol>"},{"id":"OP00469877","notice_type":"Request for Expression of Interest","noticedate":"20-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-05T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Fiji","project_id":"P515153","project_name":"Fiji Energy Transformation Project Preparation","bid_reference_no":"FJ-EFL-567222-CS-INDV","bid_description":"Social Specialist (local)","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"2 Marlow Street\nSuva, Fiji","contact_ctry_name":"Fiji","contact_email":"bobbyc@efl.com.fj","contact_name":"Bobby Naimawi","contact_organization":"Energy Fiji Limited","contact_phone_no":"(679) 9992468","contact_web_url":"www.efl.com.fj","submission_date":"2026-09-20T00:00:00Z","notice_text":"<p><strong>TERMS OF REFERENCE</strong></p><p><strong>SOCIAL OFFICER (Local) - (FULL-TIME)</strong></p><p><strong>Preparation for Fiji Energy Transformation Project</strong></p><p>Project Preparation Unit (PPU) | Energy Fiji Limited (EFL)<br />World Bank Environmental and Social Framework (ESF)</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:192px\"><p><strong>Name of Project</strong></p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:461px\"><p>Fiji Energy Transformation Project</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Implementing Agency</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>Energy Fiji Limited (EFL)</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Assignment Title</strong></p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>Social Officer (Local) - (Full-Time)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Organisational Unit</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>Project Preparation Unit (PPU)</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Primary Framework</strong></p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>World Bank Environmental and Social Framework (ESF)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Duty Station / Coverage</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>PPU office, with regular field visits across Viti Levu, Vanua Levu and Taveuni</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Reporting Line</strong></p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>Environmental and Social (E&amp;S) Specialist; PPU Project Manager on overall project matters</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:192px\"><p><strong>Expected Commencement</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:461px\"><p>As soon as possible</p></td></tr></tbody></table><p>Table of Contents</p><p>Table of Contents. 1</p><p>1. Introduction and Background. 3</p><p>2. Objective of the Assignment 3</p><p>3. Scope of Work. 3</p><p>3.1 Stakeholder Engagement and Community Liaison. 3</p><p>3.2 Indigenous Peoples Planning Framework (IPPF) 3</p><p>3.3 Resettlement Policy Framework (RPF) 4</p><p>3.4 Negotiated Land Agreement Due Diligence. 4</p><p>3.5 Gender and Vulnerability. 4</p><p>3.6 Labor and Working Conditions - Social Dimensions. 4</p><p>3.7 Coordination with Government Line Ministries and Agencies. 5</p><p>3.8 Capacity Building. 5</p><p>3.9 Reporting and Coordination. 5</p><p>4. Methodology and Approach. 5</p><p>5. Key Deliverables and Indicative Timing. 6</p><p>6. Assignment Duration and Work Programme. 6</p><p>7. Required Qualifications and Experience. 6</p><p>7.1 Education. 6</p><p>7.2 Professional Experience. 6</p><p>7.3 Skills and Competencies. 7</p><p>8. Reporting and Working Arrangements. 7</p><p>9. Application Requirements. 7</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>1. Introduction and Background</p><p>The Fiji Energy Transformation Project is proposed as a USD 230 million World Bank-supported initiative aimed at accelerating renewable energy, modernizing the power grid, and reforming the energy sector to attract private investment. Key interventions include large-scale solar photovoltaic (PV) and battery energy storage system (BESS) parks of 50 MW or more each, grid evacuation infrastructure, transmission line upgrades, and modernization of existing power stations across Viti Levu, Vanua Levu, and Taveuni. The project&rsquo;s environmental and social risks have been classified as Substantial under the World Bank Environmental and Social Framework (ESF).</p><p>A significant portion of land in the project area is held under customary iTaukei tenure and managed through the iTaukei Land Trust Board (TLTB). Many affected communities are iTaukei Fijians who qualify as Indigenous Peoples under ESS7. The project may also involve economic and physical displacement linked to land acquisition for solar parks, transmission lines, and associated infrastructure, triggering ESS5 on Land Acquisition, Restrictions on Land Use and Involuntary Resettlement.</p><p>The Social Officer will be embedded within the PPU and will work under the day-to-day supervision of the Environmental and Social (E&amp;S) Specialist, who has overall leadership of the project&rsquo;s E&amp;S function. The Social Officer will work in close coordination with the Environment Officer. Together, these positions constitute the project&rsquo;s E&amp;S team and are jointly responsible for delivering the suite of ESF instruments required for project appraisal and for supporting implementation thereafter.</p><p>2. Objective of the Assignment</p><p>The objective of the assignment is to support the timely preparation of all social-related ESF instruments required for appraisal, ensure ongoing and meaningful stakeholder engagement throughout project preparation and implementation, and serve as the PPU&rsquo;s primary liaison with government line ministries and agencies responsible for land, indigenous affairs, and social protection.</p><p>3. Scope of Work</p><p>3.1 Stakeholder Engagement and Community Liaison</p><p><strong>a.</strong> Lead the preparation, implementation, and updating of the project&rsquo;s Stakeholder Engagement Plan (SEP), in close coordination with the E&amp;S Specialist, who will review and finalize the instrument. The SEP must include:</p><ul><li>A project-wide grievance redress mechanism (GRM), including a reporting structure for complaint escalation and resolution within specified timeframes.</li><li>A dedicated pathway for Sexual Exploitation and Abuse / Sexual Harassment (SEA/SH) complaints, including resolution or escalation timeframes.</li><li>Differentiated engagement approaches for iTaukei communities, women, and other vulnerable groups.</li><li>A disclosure schedule compliant with ESF requirements.</li></ul><p><strong>b.</strong> Serve as the PPU&rsquo;s primary point of contact for community-level consultations across project sites on Viti Levu, Vanua Levu, and Taveuni. Coordinate field consultation logistics with the Environment Officer so that environmental and social consultations are sequenced and, where possible, combined to minimize the burden on communities.</p><p><strong>c.</strong> Maintain a consultation log recording meetings, attendees disaggregated by gender and community role, issues raised, and follow-up actions. Share the log with the E&amp;S Specialist and Environment Officer on a fortnightly basis.</p><p><strong>d.</strong> Ensure that Free, Prior and Informed Consent (FPIC) processes are properly documented for all iTaukei communities in the project&rsquo;s area of influence, in accordance with ESS7 and applicable Fijian law.</p><p>3.2 Indigenous Peoples Planning Framework (IPPF)</p><p><strong>a.</strong> Lead the preparation of the Indigenous Peoples Planning Framework (IPPF) in accordance with ESS7. The IPPF must:</p><ul><li>Liaise with the EFL Lands Team to identify all iTaukei communities and landowning units (mataqali) in the project&rsquo;s area of influence.</li><li>Set out a methodology for social assessment and FPIC at the site-specific level.</li><li>Define entitlements and culturally appropriate benefit-sharing mechanisms.</li><li>Establish culturally sensitive grievance and feedback channels.</li><li>Address gender dynamics and vulnerabilities within iTaukei communities.</li></ul><p><strong>b.</strong> Coordinate with the E&amp;S Specialist to ensure consistency between the IPPF, the Resettlement Policy Framework (RPF), and the SEP, so that the instruments present a coherent and non-contradictory framework for community engagement and entitlements.</p><p><strong>c.</strong> Where site-specific Indigenous Peoples Plans (IPPs) are required, support their preparation in parallel with, or as a follow-on to, the IPPF.</p><p>3.3 Resettlement Policy Framework (RPF)</p><p><strong>a.</strong> Support the E&amp;S Specialist in preparing the RPF in accordance with ESS5. The Social Officer will be responsible for:</p><ul><li>Conducting or supervising social baseline surveys required to inform the RPF.</li><li>Documenting existing land use, livelihoods, and community assets in project-affected areas.</li><li>Drafting the entitlement matrix in coordination with the E&amp;S Specialist.</li><li>Ensuring that the RPF reflects the specificities of iTaukei land tenure and customary rights.</li></ul><p><strong>b.</strong> Coordinate with the Environment Officer to ensure that environmental footprint assessments underpinning the RPF, including site boundaries, buffer zones, and access routes, are accurate and consistently applied across instruments.</p><p>3.4 Negotiated Land Agreement Due Diligence</p><p><strong>a.</strong> Support the E&amp;S Specialist in preparing the Negotiated Land Agreement Due Diligence Report. The Social Officer will:</p><ul><li>Coordinate with the EFL Lands Team and liaise with the TLTB and relevant landowning units (mataqali) to understand existing or proposed negotiated land agreements for solar park and transmission line sites.</li><li>Verify the voluntariness of negotiations and document indicators of undue pressure or inadequate community representation.</li><li>Identify gaps between existing agreements and ESF requirements and propose remediation measures.</li></ul><p>3.5 Gender and Vulnerability</p><p><strong>a.</strong> Integrate gender analysis into all social instruments, ensuring that the project identifies and responds to differential impacts on women, girls, and other vulnerable or marginalized groups.</p><p><strong>b.</strong> Support the preparation of a Gender Action Plan or equivalent measures, in coordination with the E&amp;S Specialist.</p><p><strong>c.</strong> Identify and document vulnerable households in the project area, including elderly people, persons with disabilities, female-headed households, and households with insecure tenure, and ensure they are reflected in the RPF entitlement matrix and the IPPF.</p><p>3.6 Labor and Working Conditions - Social Dimensions</p><p><strong>a.</strong> Contribute to the Labor Management Procedures (LMP) by preparing the social dimensions, including community hiring provisions, management of labor influx risks, SEA/SH and communicable disease risks in host communities, supply chain social due diligence requirements, and conflict resolution between workers and community members. The E&amp;S Specialist retains overall responsibility for the LMP.</p><p><strong>b.</strong> Coordinate with the Environment Officer on environmental health dimensions of labor influx, including waste, water, and camp management, to ensure that the LMP presents unified and internally consistent measures.</p><p>3.7 Coordination with Government Line Ministries and Agencies</p><p>The Social Officer will serve as the PPU&rsquo;s primary liaison with the following entities on social matters:</p><ul><li>Ministry of Lands and Mineral Resources: land acquisition procedures, state land matters, and coordination of required land surveys or valuations.</li><li>iTaukei Affairs Board / Ministry of iTaukei Affairs: customary governance, community protocols, and support for FPIC processes.</li><li>iTaukei Land Trust Board (TLTB): management of iTaukei land, negotiated agreements, lease arrangements, and consent from landowning units.</li><li>Department of Social Welfare / Ministry of Women, Children and Poverty Alleviation: identification of vulnerable households and gender considerations.</li><li>Any other relevant agency identified during preparation as having a mandate over affected communities or social protection matters.</li></ul><p>The Social Officer will establish and maintain regular contact with focal points in each agency, keep records of correspondence and meetings, and report on ministry engagement to the E&amp;S Specialist as part of the fortnightly joint E&amp;S team update.</p><p>3.8 Capacity Building</p><p><strong>a.</strong> Together with the E&amp;S Specialist and Environment Officer, contribute to the preparation of the TOR for EFL&rsquo;s institutional Environmental and Social Management System (ESMS), specifically the social management components.</p><p><strong>b.</strong> Provide on-the-job guidance to EFL staff engaged in community liaison activities during project preparation.</p><p>3.9 Reporting and Coordination</p><p><strong>a.</strong> Prepare monthly progress reports on social preparation activities and submit them to the E&amp;S Specialist for integration into the consolidated E&amp;S team report to the PPU Project Manager.</p><p><strong>b.</strong> Maintain a live Social Risk Register tracking identified social risks and mitigation measures, updated fortnightly and shared with the E&amp;S Specialist and Environment Officer.</p><p><strong>c.</strong> Participate in the mandatory weekly joint E&amp;S team meeting and the fortnightly joint risk register review.</p><p><strong>d.</strong> Coordinate all field visits jointly with the Environment Officer and E&amp;S Specialist. Where a visit has environmental and social dimensions, the Social Officer and Environment Officer will attend together wherever possible to minimize multiple visits and support integrated data collection.</p><p><strong>e.</strong> Before submitting an instrument draft to the E&amp;S Specialist, circulate it to the Environment Officer for a peer consistency check covering site boundaries, affected population figures, and mitigation commitments.</p><p><strong>f.</strong> Support the E&amp;S Specialist during World Bank supervision missions and technical reviews, including preparation of briefing materials and attendance at relevant meetings.</p><p>4. Methodology and Approach</p><p>The Social Officer will apply an integrated, participatory, and evidence-based approach throughout the assignment. The approach will include:</p><ul><li>Desktop review of available project documents, land information, consultation records, and relevant social baseline information.</li><li>Field-based social assessment and community consultation across relevant project locations.</li><li>Culturally appropriate engagement with iTaukei communities and landowning units, including documentation of FPIC where required.</li><li>Coordination with the E&amp;S Specialist, Environment Officer, EFL Lands Team, government agencies, and other relevant stakeholders.</li><li>Preparation, review, updating, and consistency checking of social instruments and associated records.</li><li>Routine monitoring through consultation logs, the Social Risk Register, progress reports, and agreed coordination meetings.</li></ul><p>5. Key Deliverables and Indicative Timing</p><p>All deliverables are subject to World Bank review and clearance. The primary target is project appraisal. Specific submission dates will be agreed with the E&amp;S Specialist and PPU Project Manager upon commencement.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#2e74b5; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:43px\"><p><strong>No.</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:269px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:173px\"><p><strong>Role of Social Officer</strong></p></td><td style=\"background-color:#2e74b5; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:168px\"><p><strong>Indicative Timing</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>1</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Stakeholder Engagement Plan (SEP), including GRM and SEA/SH pathway</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Lead drafter</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>2</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Indigenous Peoples Planning Framework (IPPF)</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Lead drafter</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>3</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>RPF social baseline surveys and entitlement matrix</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Lead under E&amp;S Specialist oversight</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>4</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Negotiated Land Agreement Due Diligence Report</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Key contributor under E&amp;S Specialist lead</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>5</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>LMP labor influx and SEA/SH sections</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Lead drafter for social sections</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>6</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Gender analysis integrated across social instruments</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Lead</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>Ongoing across instrument preparation</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>7</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Social Risk Register</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Owner</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>Fortnightly updates; ongoing</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>8</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Progress reports</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Author</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>9</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Consultation logs</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Owner</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>Ongoing; shared fortnightly</p></td></tr><tr><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:43px\"><p>10</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:269px\"><p>Contribution to EFL ESMS TOR - social components</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:173px\"><p>Contributor</p></td><td style=\"background-color:#eef4f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:168px\"><p>During preparation; timing to be agreed</p></td></tr></tbody></table><p>6. Assignment Duration and Work Programme</p><p>The position is expected to commence as soon as possible and will cover the full project preparation period through appraisal, with the possibility of extension into implementation. Upon commencement, the Social Officer will agree detailed submission dates, priorities, and an activity schedule with the E&amp;S Specialist and PPU Project Manager. Regular field travel will be required.</p><p>7. Required Qualifications and Experience</p><p>7.1 Education</p><ul><li>A university degree in social sciences, anthropology, development studies, law, or a related field. A postgraduate degree is an advantage.</li></ul><p>7.2 Professional Experience</p><ul><li>A minimum of five (5) years of relevant professional experience in social safeguards or social risk management on infrastructure or energy projects.</li><li>Demonstrated experience with World Bank ESF instruments, including ESS1, ESS2, ESS5, ESS7 and ESS10, or equivalent IFC Performance Standards.</li><li>Demonstrated experience working with Indigenous Peoples and customary land tenure systems in the Pacific or comparable contexts.</li><li>Experience liaising with government land administration agencies. Familiarity with Fiji&rsquo;s iTaukei land tenure system and the role of the TLTB is a strong advantage.</li></ul><p>7.3 Skills and Competencies</p><ul><li>Strong facilitation and consultation skills, including experience conducting consultations with rural and indigenous communities.</li><li>Strong coordination, record-keeping, analytical, and report-writing skills.</li><li>Ability to work collaboratively within a multidisciplinary E&amp;S and project preparation team.</li><li>Excellent written and spoken English. Knowledge of iTaukei Fijian or Fiji Hindi is an advantage.</li></ul><p>8. Reporting and Working Arrangements</p><p>The Social Officer is a full-time position based at the PPU office, with regular field visits to project sites across Viti Levu, Vanua Levu, and Taveuni. The Social Officer reports to the E&amp;S Specialist on a day-to-day basis and to the PPU Project Manager on overall project matters. The Social Officer will participate in the weekly joint E&amp;S team meeting and the broader PPU team meeting.</p><p>9. Application Requirements</p><p>Interested candidates should submit a curriculum vitae and a cover letter describing their relevant experience in relation to the scope of work set out in this TOR. Applications will be reviewed on a rolling basis.</p><p>&nbsp;</p><p><strong>Submission</strong></p><p>Further information can be obtained by emailing to tenders@efl.com.fj during office hours 8:00 AM to 4:30 PM (Fiji Time), Monday to Friday clear 3 days from the closing date of this EOI.</p><p>Expressions of interest must be uploaded to the EFL e-Tender Portal (TenderLink) at https://www.tenderlink.com/efl(opens in new window), by registering your company, by 4:00 PM (1600 hrs) Fiji Time on Wednesday 5th October 2026.</p><p>Tender documents may be viewed and downloaded from www.efl.com.fj(opens in new window) or https://www.tenderlink.com/efl(opens in new window).</p><p>Submissions by email or facsimile will not be accepted and will be deemed null and void. Hard copy submissions to the tender box at EFL Head Office, Suva, will not be accepted.</p>"},{"id":"OP00469561","notice_type":"Request for Expression of Interest","noticedate":"17-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-17T00:00:00Z","submission_deadline_time":"14:30","project_ctry_name":"Western and Central Africa","project_id":"P500628","project_name":"Western Africa Regional Digital Integration Program - Series of Projects 2","bid_reference_no":"LR-MOPT-572371-CS-CQS","bid_description":"Engagement of Communication Consultant to support WARDIP Activities","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"McDonald & Carey Streets\n1000 Monrovia, 10 Liberia","contact_ctry_name":"Liberia","contact_email":"swaraymas@mopt.gov.lr","contact_name":"Mohammed  Swaray","contact_organization":"Ministry of Posts and Telecommunications","contact_phone_no":"+231 88 652 4425","contact_web_url":"MoPtT","submission_date":"2026-09-17T00:00:00Z","notice_text":"<p><strong>Contract Type:</strong> Individual Consultant (IC)</p><p><strong>Recruitment Type:</strong> Local</p><p><strong>Duration of Assignment:</strong> Twelve (12) months, renewable annually based on satisfactory performance, project requirements, and availability of funding.</p><p><strong>Reporting Line:</strong> WARDIP SOP2-Liberia Project Coordinator</p><ol><li><strong>BACKGROUND&nbsp;</strong></li></ol><p>The Government of Liberia (GoL) has received financing from the World Bank (WB) for the West Africa Regional Digital Integration Project &ndash; Series of Projects 2 Liberia (WARDIP SOP2-Liberia). This project, to be implemented at the national level, seeks to facilitate increased broadband access and usage in preparation for the integration of regional digital markets in West Africa.&nbsp;</p><p>WARDIP SOP2 builds on, and will run parallel to, investments in DTfA/WARDIP SOP1, further extending cross-border and backbone connectivity, data markets, and online market environment in additional countries. It aims to increase broadband access and usage in participating countries and to advance the integration of digital markets in Western Africa and is structured around six components.&nbsp;</p><ul><li><em>Component I. Building Policy and Financing Pathways for West African SDM:</em> This component aims to support the west African Economic and Monetary &ndash; Union&rsquo;s (WAEMU) strategic vision of creating an SDM in West Africa. It is a regional-level component implemented at the WAEMU level and is not financed or implemented at the country level in Liberia.</li></ul><p>Liberia&rsquo;s participation under WARDIP SOP2 focuses on Components II through VI, which support the national investments and reforms aligned with the regional integration objectives of the program.</p><ul><li><em>Component I. Connectivity Market Development and Integration</em>: This component aims to provide infrastructure financing and support for an enhanced enabling environment to develop the regional broadband connectivity market.&nbsp;</li><li><em>Component III: Data Market Development and Integration</em>: This component aims to build trust in online transactions and strengthen the security and resilience of digital infrastructure and systems, focused on enabling secure, cross-border data exchange, storage, and processing to support regional access to data-driven services, innovation, and infrastructure.&nbsp;</li><li><em>Component IV. Online Market Development and Integration:</em> This component aims to support the development of a robust regional online market, with a focus on boosting service uptake for an integrated SDM.&nbsp;</li><li><em>Component V. Project Management and Implementation Support.</em> This component would provide technical assistance and capacity support for program preparation and implementation.</li><li><em>Component VI. Contingent Emergency Response.</em> The component is included to help participating countries respond swiftly to eligible crises and emergencies, in case of urgent need for assistance or capacity constraints.</li></ul><p>The GoL, through the Ministry of Post and Telecommunications (MoPT) under the World Bank-WARDIP-Liberia Initiative, seeks to recruit a highly qualified and motivated Individual for the <strong>Communications Specialist</strong> position to lead the design and implementation of the project&rsquo;s communication, stakeholder engagement, and visibility objectives.</p><ol><li><strong>OBJECTIVES OF THE ASSIGNMENT</strong></li></ol><p>The overall objective of this assignment is to provide strategic leadership and hands-on development and implementation for the planning, coordination, implementation, and monitoring of all communication, stakeholder engagement, public information, knowledge management, branding, and visibility activities under the Project.&nbsp;</p><p>Reporting to the Project Coordinator, the Communications Specialist shall lead the development and execution of an integrated Communication and Stakeholder Engagement Strategy that promotes transparency, accountability, and public understanding of the project activities, and achievements, whilst ensuring that the communication reaches implementing institutions, development partners, private sector, civil society, the private sector and beneficiary communities in a timely, accurate, and accessible manner.&nbsp;</p><p>The Specialist will support the Project&rsquo;s objectives by advancing its institutional and public awareness, while strengthening stakeholder engagement, media relations, branding compliance, and institutional coordination in line with the GoL and the WB guidelines and policies.&nbsp;</p><ol><li><strong>SCOPE OF WORK</strong></li></ol><p>The Communication Specialist will undertake the following, but not limited to, tasks in close collaboration with the PIU and stakeholders:&nbsp;</p><ol><li><strong>Design and Implement a Comprehensive Communication Strategy and Work Plan&nbsp;</strong></li></ol><p>The Communication Specialist will develop and execute an annual communication and stakeholder engagement strategy and work plan, including key performance indicators and a monitoring framework, to ensure the prompt and effective sharing of project progress updates while fostering transparency and accountability. This includes conducting continuous internal and external communications needs assessments through stakeholder consultations; developing communication products and establishing outreach schedules. The Specialist shall continuously assess the effectiveness of communication interventions and visibility risks, and take appropriate measures to strengthen stakeholder engagement and public participation throughout project implementation.</p><p>The strategy shall include evidence-based and targeted communication and outreach approaches that raise awareness of the project&rsquo;s objectives, progress, and benefits among internal and external stakeholders. Campaigns shall be gender-inclusive, culturally appropriate, and accessible (with particular attention to reaching underserved and marginalized populations), delivered through an appropriate mix of communication channels and outlets (e.g., national and community radio, television, newspapers, social media platforms, the project website, podcasts, digital storytelling, SMS and mobile communication campaigns, digital newsletters, public exhibitions, stakeholder forums, community outreach meetings, town hall engagements, innovation events, and Information, Education and Communication (IEC) materials).&nbsp;</p><ol><li><strong>Media Relations and Public Relations</strong></li></ol><p>The Communications Specialist will serve as the primary media focal point, establishing and maintaining effective working relationships with national, regional, and international media outlets to promote accurate, timely reporting on project activities and outcomes, while mitigating risks of misinformation or distortion. This includes developing and implementing a comprehensive media engagement strategy; preparing press releases, statements, briefing materials, organizing press conferences, interviews, and media coverage of key project milestones, and responding to media inquiries. The Specialist shall monitor media coverage and public sentiment, and advise PIU on communication risks and reputational management. All media engagements shall comply with GoL protocols and the WB access to information and disclosure policy requirements.</p><ol><li><strong>Digital Communications and Online Engagement</strong></li></ol><p>The Communications Specialist shall manage and upkeep the project&rsquo;s formal online communication channels and platforms to ensure they remain up to date, accessible, and informative, publishing project updates, announcements, procurement notices, consultation schedules, and implementation progress. This includes producing high-quality multimedia content &ndash; including graphics, videos, infographics, and digital stories &ndash; to effectively communicate project key milestones and development impacts. The Specialist shall implement targeted online awareness campaigns, monitor social media analytics, and use data-driven insights to improve digital reach and stakeholder participation.</p><ol><li><strong>Citizen Engagement, Stakeholder Communication, and Public Feedback</strong></li></ol><p>The Communications Specialist shall strengthen citizen engagement by developing and implementing two-way participatory communication mechanisms &ndash; including public information sessions, community consultations, stakeholder forums, and feedback channels &ndash; to promote timely and effective dialogue between the project and the beneficiaries. The Specialist shall ensure that the feedback mechanisms are clear, accessible, and easy for beneficiaries to use, and that all feedback received is appropriately recorded and tracked in a timely manner.&nbsp;</p><p>The Specialist shall support a full feedback loop across all engagement activities &ndash; ensuring that inputs, questions, and concerns raised by beneficiaries and stakeholders (whether through consultations, forums, feedback channels, or the GRM) are acknowledged, addressed, and communicated back to the relevant parties in accessible, plain-language formats in a timely manner &ndash; so that engagement with the project is transparent and accountable.</p><p>In carrying out these responsibilities, the Specialist shall be accountable for all public-facing communication dimensions: raising awareness of feedback and grievance channels, producing plain-language information materials on project activities and safeguard obligations, and communicating outcomes and resolutions back to affected communities. All citizen engagement and feedback activities shall be implemented in close coordination with the relevant PIU staff, particularly the Environmental and Social and Gender-based Violence Safeguard Specialists. The Environmental and Social and GBV Safeguard Specialists shall retain responsibility for the technical and case management dimensions-including GRM case registration, investigation, and resolution; ESCP compliance monitoring; and SEP implementation oversight. The specialists shall coordinate regularly to ensure that communication activities, safeguard commitments, and beneficiary-facing messaging are fully aligned.&nbsp;</p><ol><li><strong>Documentation of Lessons Learned and Success Stories&nbsp;</strong></li></ol><p>The Communications Specialist shall coordinate the preparation and dissemination of knowledge products &ndash; including case studies, lessons learned, success stories, and implementation experiences &ndash; to support institutional learning and evidence-based decision-making. The Specialist shall collaborate closely with the PIU staff, implementing agencies, the Monitoring and Evaluation (M&amp;E) Specialist, and other stakeholders to ensure project experiences and results are systematically documented and effectively communicated to support knowledge sharing and continuous improvement.</p><ol><li><strong>Branding, Visibility, and Corporate Identity Management</strong></li></ol><p>The Communications Specialist shall ensure that all project communication products, publications, events, and visibility materials comply with WB branding and visual identity guidelines, GoL communication protocols, Ministry of Posts and Telecommunications (MoPT) corporate identity standards. This includes coordinating the design, production, quality assurance, and distribution of communication and visibility materials &ndash; such as prints, templates, exhibition materials, and signage &ndash; while ensuring consistent messaging and visual identity across all communication channels, publications, and public events.</p><ol><li><strong>Photography, Videography, and Multimedia Documentation</strong></li></ol><p>The Communications Specialist shall coordinate and document project-related digital photography, videography, and multimedia documentation &ndash; including launches, stakeholder consultations, campaigns, capacity-building activities, field visits, events, and key milestones. The Specialist shall establish and maintain a secure digital archive of approved multimedia content for communication, reporting, visibility, and knowledge management purposes. All multimedia documentation shall strictly comply with the WB&rsquo;s Access to Information Policy (ATI) and the Policy on Personal Data Privacy, including requirements relating to informed consent, confidentiality, safeguarding, ethical storytelling, and the use of personal information.</p><ol><li><strong>Institutional Communication and Coordination</strong></li></ol><p>The Communications Specialist shall strengthen and maintain internal communication and information-sharing mechanisms within the PIU, implementing agencies, and stakeholders to improve coordination, collaboration, and efficiency. This includes developing internal communication protocols, preparing communication inputs (i.e., newsletter, briefing, progress report) to support project reporting needs. Working closely with the Project Coordinator and the PIU staff, the Communications Specialist shall ensure the timely dissemination of accurate and consistent information on project priorities, progress, achievements, challenges, risks, and results, supporting close coordination and informed decision-making throughout the project lifecycle.</p><ol><li><strong>QUALIFICATIONS AND EXPERIENCE</strong></li></ol><p>Mandatory requirements:</p><ol><li><strong>Education</strong>. Master&rsquo;s Degree in Communications, Public/International Relations, Journalism, Media Studies, Digital Media, Marketing, International Development, Public Administration, Information Management, or other relevant discipline. A Bachelor&rsquo;s Degree in a related field may be considered in lieu of a Master&rsquo;s, provided it is accompanied by at least two (2) years of additional relevant professional experience.</li><li><strong>Professional Experience</strong>. At least five (5) years of relevant experience (or seven (7) years for candidates holding a Bachelor&rsquo;s Degree), demonstrating progressive growth in strategic communications, public relations, media relations, or related areas. Demonstrated experience in developing and implementing communication strategies, public awareness campaigns, behavior change communication, media engagement, and visibility activities. Strong knowledge of communication tools and methodologies for planning, executing, and monitoring communications strategies. Experience developing communication strategies/frameworks for government or international/multilateral/donor organizations is highly preferred.</li><li><strong>Demonstrated experience developing communication materials</strong>, managing digital platforms and multimedia content (photography, videography, digital storytelling), coordinating public events and stakeholder engagement, and preparing press releases, communication products, and analytical reports, including familiarity with WB or development partner visibility and disclosure requirements. Experience in digital transformation, ICT, broadband infrastructure, or e-government projects is an advantage.</li></ol><p>Preferred qualifications:&nbsp;</p><ol><li>Excellent language skills and proficiency to write and edit engaging and targeted communications products for purposeful structure, clarity of ideas, and logical, persuasive presentation;&nbsp;</li><li>Outstanding organizational and planning abilities with the ability to handle and prioritize multiple tasks and nurture relationships with critical internal and external constituencies and stakeholders.</li><li>Strong computer skills and ability to learn new software applications efficiently&ndash; Office Suite (Word, Excel, PowerPoint, Outlook), desktop publishing tools (e.g., Adobe Creative Suite), Content Management &amp; Web, and strong command of social media platform best practices (Meta, Youtube, X, LinkedIn, etc.). Candidates must also demonstrate competence in digital communication/conference platforms (e.g., Microsoft Teams, Webex, Zoom)</li><li>Proficient in English and conversant with the local languages.</li><li>Experience with similar assignments with governments, the WB or other international/donor-funded projects and initiatives will be given preference.</li><li>Proven ability to work independently and proficiently interact and establish work relationships across multiple disciplinary teams and representatives</li><li>Ability to work under pressure and manage competing demands in a fast-paced environment, whilst successfully meeting deadlines, expectations, and performing work duties as required.</li></ol><ol><li><strong>TERMS AND DURATION OF ASSIGNMENT</strong></li></ol><p>The Communications Specialist will be appointed on a full-time basis, based in Monrovia Liberia, for a period of twelve (12) months. Extension of this position may be considered and will be dependent upon satisfactory performance and availability of funding.</p><p>The PIU will provide office space, general office supplies, and equipment. The majority of the assignment will be performed in an office-type setting with occasional on-site visits to project sites.</p><p>The Communications Specialist shall report directly to the Project Coordinator and work closely with the Project Implementation Unit staff and implementing agencies, contractors, consultants, government institutions, media organizations and outlets, stakeholders, and the WB Task Team. The Communications Specialist shall coordinate with relevant PIU staff and stakeholders to ensure effective planning, implementation, and monitoring of communication activities, including public information campaigns, stakeholder engagement, knowledge management, project visibility, and dissemination of WARDIP SOP II achievements, progress updates, and results. The Communication Specialist shall provide timely communication support to the PIU to promote transparency, accountability, and effective stakeholder engagement throughout the project lifecycle.</p><p>The Communications Specialist shall prepare and submit regular communication, visibility, and stakeholder engagement reports to support effective project implementation and accountability. Reporting requirements shall include periodic communication activity reports, annual Communication and Visibility Action Plans, stakeholder engagement updates, media monitoring reports, digital communication analytics reports, knowledge management reports, event documentation reports, success stories, case studies, and a final assignment report. The Specialist shall ensure that all reports provide accurate information on communication activities undertaken, outreach achieved, stakeholder engagement outcomes, communication challenges, lessons learned, and recommendations for improving project visibility and public engagement.</p><p>The Communications Specialist shall maintain strict confidentiality of project information, communication materials, stakeholder data, and any sensitive information obtained during the execution of the assignment. The Specialist shall ensure that all communication activities comply with the GoL policies, MoPT requirements, WB communication and access to information policy, and applicable environmental and social safeguard requirements.&nbsp;</p><p>The Specialist shall adhere to the principles of accuracy, transparency, inclusiveness, and responsible communication when developing and disseminating project information. The Specialist shall ensure ethical use of photographs, videos, beneficiary stories, and personal information by obtaining appropriate consent and protecting the dignity and privacy of project stakeholders. The Communications Specialist shall comply with the WB Procurement Regulations for IPF Borrowers, Environmental and Social Framework (ESF), Anti-Corruption Guidelines, and applicable project procedures. The Specialist shall avoid conflicts of interest and maintain the highest standards of professionalism, integrity, transparency, accountability, and ethical conduct throughout the assignment.</p><ol><li><strong>RECRUITMENT METHOD&nbsp;</strong></li></ol><p>The successful candidate shall be selected in accordance with the Open Competitive Selection of Individual Consultants method set out in the WB Procurement Regulations for IPF Borrowers, Procurement in Investment Project Financing (IPF), September 2025.</p><ol><li><strong>APPLICATION PROCEDURE</strong></li></ol><p>Interested candidates are invited to submit an Expression of Interest (EOI) clearly titled as &ldquo;Application for the Position of Communications Specialist&rdquo; outlining qualifications and interest in the position, along with a Curriculum Vitae (CV) and other relevant supporting documents (e.g., copy of diploma, certificates, or references). Only shortlisted candidates will be contacted by the hiring team. Applications may be submitted electronically <strong>or</strong> in hard copy as follows:</p><p><strong>Electronic Submission:</strong> wardip.project@mopt.gov.lr with copy to: swaraymas@mopt.gov.lr , neorgreaves@mopt.gov.lr<strong>&nbsp; and</strong> morris123karu@gmail.com&nbsp;</p><p><strong>Hard Copy Submission:</strong></p><p><strong>Attention to:</strong><br />Ka-Rufus G. Morris<br />Project Procurement Specialist&nbsp;</p><p>Western Africa Regional Digital Integration Project-Liberia (WARDIP-SOP II-Liberia)</p><p>Ministry of Posts and Telecommunications<br />McDonald and Carey Streets<br />Monrovia, Liberia</p><p>Applications must include EOI, CV, and any relevant supporting documents, and must be received <strong>no later than 4:00 p.m. (GMT) on Wednesday, September 30, 2026</strong>. The application period opens on <strong>, Tuesday September 1 2026</strong>.</p><p>Interested applicants are encouraged to visit the <strong>Ministry of Posts and Telecommunications (MoPT) website (</strong><strong>www.mopt.gov.lr</strong><strong>)</strong>&nbsp; for information on the position as well.</p><p>For further information or clarification, interested applicants may contact the Project Procurement Specialist during official working hours (09:00 a.m. to 5:00 p.m., Monday to Friday) through &ndash; Telephone: +231- 0777- 549- 476&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00469389","notice_type":"Request for Expression of Interest","noticedate":"16-Sep-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-30T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Fiji","project_id":"P515153","project_name":"Fiji Energy Transformation Project Preparation","bid_reference_no":"FJ-EFL-567224-CS-INDV","bid_description":"Environmental and Social Specialists (international) – 90 days","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"2 Marlow Street\nSuva, Fiji","contact_ctry_name":"Fiji","contact_email":"bobbyc@efl.com.fj","contact_name":"Bobby Naimawi","contact_organization":"Energy Fiji Limited","contact_phone_no":"(679) 9992468","contact_web_url":"www.efl.com.fj","submission_date":"2026-09-16T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST - INDIVIDUAL CONSULTANT SELECTION</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:206px\"><p><strong>Name of Project</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:456px\"><p>Fiji Energy Transformation Project (P518499) - Grant Facility for Project Preparation (GFPP)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Loan No/Credit No/Grant Number</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>GFPP Grant No. TF0D0728</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>International Environmental and Social (E&amp;S) Specialist</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Procurement Plan Ref Number</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>FJ-EFL-567224-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Reference No.</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>EOI-04/2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:206px\"><p><strong>Country of Delivery</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:456px\"><p>Republic of Fiji</p></td></tr></tbody></table><p>&nbsp;</p><p>The Republic of Fiji, acting through Energy Fiji Limited (EFL), has received financing from the World Bank toward the cost of preparing the Fiji Energy Transformation Project and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&quot;the Services&quot;) comprise specialist environmental and social support to EFL&#39;s Project Preparation Unit. The Consultant will lead preparation of appraisal-stage environmental and social instruments, integrate requirements of the World Bank Environmental and Social Framework into technical and procurement outputs, support policy and regulatory reviews, and prepare a procurement-ready terms of reference for a separate assignment to develop and operationalize EFL&#39;s institutional Environmental and Social Management System.</p><p>&nbsp;</p><p><strong>The Services will cover:</strong></p><p>&bull; general environmental and social support to the Project Preparation Unit, including screening, risk-register management, ESCP inputs, coordination and practical capacity building;</p><p>&bull; preparation of E&amp;S scoping studies with critical-habitat screening, a site-specific ESMP for aging asset replacement, an RPF, negotiated land agreement due diligence, an integrated SEP, and LMP;</p><p>&bull; preparation of a procurement-ready TOR for development and operationalization of EFL&#39;s institutional ESMS;</p><p>&bull; environmental and social review of Electricity Act amendments, Rooftop Solar PV Policy, and private-sector renewable-energy participation;</p><p>&bull; E&amp;S inputs to the National control-centre upgrade, , aging power-infrastructure, grid-interconnection, hydropower and solar PV/BESS studies and concept designs; and</p><p>&bull; monthly and quarterly reporting, disclosure support and an appraisal-stage E&amp;S readiness summary.</p><p>&nbsp;</p><p><strong>Implementation period: The assignment is expected to be part-time for the full GFPP implementation period, estimated at [24 months], subject to satisfactory performance and availability of GFPP financing.</strong></p><p>&nbsp;</p><p>Terms of Reference: The detailed Terms of Reference are attached to this REOI as Appendix 1.</p><p>&nbsp;</p><p>Energy Fiji Limited now invites eligible individual consultants (&quot;Consultants&quot;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they possess the required qualifications and relevant experience.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to the applicable provisions of the World Bank Procurement Regulations for IPF Borrowers concerning conflict of interest.</p><p>&nbsp;</p><p><strong>EOI Evaluation Criteria</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:581px\"><p><strong>Criterion</strong></p></td><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:82px\"><p><strong>Weight</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>1. Relevant E&amp;S assessment and management experience for infrastructure or energy projects</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>25%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>2. Demonstrated application of the World Bank ESF or IFC Performance Standards and preparation of ESMP, land/resettlement, SEP/GRM and LMP instruments</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>3. Experience in biodiversity and critical-habitat screening, ESS5 land due diligence, and ESS7 engagement and FPIC</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>20%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>4. Relevant renewable-energy, grid infrastructure, hazardous-materials, Pacific or Fiji experience, including familiarity with iTaukei land tenure and governance</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>15%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p>5. Qualifications, writing, coordination, consultation and capacity-building capability</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:581px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:82px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Form and content of the Expression of Interest</strong>:</p><p>Expressions of interest should contain only the information necessary to assess the criteria above. Consultants should submit a curriculum vitae and a concise statement demonstrating relevant assignments and experience.</p><p>A financial proposal is not required at this stage.</p><p>The Consultant assessed as best qualified against the criteria will be invited to negotiate a contract in accordance with the applicable procurement arrangements.</p><p><strong>Submission</strong></p><p>Further information may be obtained by emailing tenders@efl.com.fj during office hours, 8:00 AM to 4:30 PM Fiji Time, Monday to Friday, no later than three clear days before the closing date.</p><p>Expressions of interest must be uploaded to the EFL e-Tender Portal (TenderLink) at https://www.tenderlink.com/efl by registering your company, by 4:00 PM (1600 hrs) Fiji Time on Wednesday, 30th September 2026.</p><p>EOI documents may be viewed and downloaded from&nbsp;www.efl.com.fj(opens in new window)&nbsp;or&nbsp;https://www.tenderlink.com/efl(opens in new window).</p><p><strong>Submissions by email or facsimile will not be accepted. Hard-copy submissions to the tender box at EFL Head Office, Suva, will not be accepted.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 1 - Terms of Reference</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>INTERNATIONAL ENVIRONMENTAL AND SOCIAL (E&amp;S) SPECIALIST</strong></p><p><strong>Fiji Energy Transformation Project (P518499)</strong></p><p>Grant Facility for Project Preparation (GFPP) - Energy Fiji Limited (EFL)</p><p>1. Introduction and Background</p><p>Energy Fiji Limited (EFL) is preparing the Fiji Energy Transformation Project (P518499), a World Bank-supported initiative estimated at USD 230 million. The project aims to accelerate renewable-energy development, modernize the power grid, rehabilitate aging infrastructure, and reform the power sector to attract private investment in solar energy. Key interventions span Viti Levu, Vanua Levu and Taveuni, including solar PV/BESS parks of more than 50 MW each, grid-evacuation infrastructure, transmission-line upgrades and modernization of existing power stations.</p><p>The Initial Environmental and Social Review Summary has classified the project&#39;s environmental and social risks as Substantial, reflecting biodiversity impacts, customary iTaukei land tenure, community health and safety, labor influx, SEA/SH risks, and supply-chain concerns associated with PV modules and battery energy storage systems.</p><p>EFL is establishing a Project Preparation Unit (PPU) to prepare the project for appraisal and Board approval. The E&amp;S Specialist will lead preparation of required E&amp;S instruments, integrate E&amp;S requirements into technical and procurement outputs, and prepare the TOR for a separate capacity-building assignment to develop and operationalize EFL&#39;s institutional ESMS.</p><p>2. Objectives of the Assignment</p><p>The objective is to ensure that GFPP-financed preparation activities and the investments they support comply with the World Bank Environmental and Social Framework, the project Environmental and Social Commitment Plan, applicable Fiji law, and Good International Industry Practice.</p><p>3. Scope of Work</p><p>The Consultant will perform the following tasks, organized into five functional areas:</p><p>3.1 General E&amp;S Support to the PPU</p><p>&bull; Serve as the PPU&#39;s E&amp;S focal point and advise the Project Manager and technical teams on application of the ESF.</p><p>&bull; Screen preparation activities and concept designs, identify applicable standards and instruments, and maintain an E&amp;S Risk Register with actions, responsibilities and status.</p><p>&bull; Prepare ESCP inputs, TORs for specialized studies, and E&amp;S requirements for technical specifications and bidding documents; oversee related consultant outputs.</p><p>&bull; Provide practical ESF training and on-the-job support to the PPU and relevant EFL staff.</p><p>&bull; Coordinate with the World Bank, relevant Fiji agencies, TLTB, technical consultants and EFL departments, and maintain records of key decisions and actions.</p><p>3.2 Preparation of E&amp;S Instruments Required by Appraisal</p><p><em>This is the most critical function of the assignment. The E&amp;S Specialist will prepare the following appraisal-stage instruments and related outputs:</em></p><p>a. E&amp;S Scoping Studies with Critical Habitat Screening</p><p>&bull; Lead scoping studies for solar PV/BESS parks on Vanua Levu and Taveuni, grid-evacuation infrastructure, and new or upgraded transmission lines.</p><p>&bull; Conduct structured Critical Habitat screening under ESS6 using available biodiversity data, including IUCN Red List species, Fiji endemic avifauna information, and protected-area registries.</p><p>&bull; Where critical habitat is identified or cannot be ruled out, prepare detailed assessments and, where necessary, a Biodiversity Management Plan with offset strategies, no-go zones and seasonal restrictions.</p><p>&bull; Include baseline social surveys, land-tenure mapping, community presence, vulnerable-group identification, and climate-resilience considerations such as cyclone, flooding and sea-level-rise risks.</p><p>b. Environmental and Social Management Plan - Aging Asset Replacement</p><p>&bull; Prepare a site-specific ESMP for rehabilitation and replacement of aging power infrastructure under Component 3, covering baseline conditions, construction and operational risks, hazardous materials including PCBs, asbestos and e-waste, mitigation, monitoring, emergency response, contractor requirements, responsibilities, schedules and costs.</p><p>c. Resettlement Policy Framework</p><p>&bull; Prepare an RPF consistent with ESS5 covering legal and institutional arrangements and gap analysis; eligibility and cut-off dates; entitlements and replacement-cost valuation; livelihood restoration; procedures for site-specific plans; consultation and grievance arrangements; monitoring, responsibilities and budget provisions.</p><p>d. Negotiated Land Agreement Due Diligence Report</p><p>&bull; Identify and document all project sites or corridors where land or access rights have been or may be secured through negotiated settlement or other voluntary arrangement, and verify consistency with ESS5 and Fiji law.</p><p>&bull; Prepare an inventory of leases, easements, access and land-use agreements, donations, transfers and other consensual arrangements, recording parcels, rights-holders, status, duration, consideration, benefits and supporting evidence.</p><p>&bull; Assess whether each arrangement is voluntary, transparent, informed and free from coercion; whether formal, informal, customary, secondary and shared rights-holders were identified and represented; and whether participants had sufficient information, time, advice and a genuine right to refuse.</p><p>&bull; For customary land and resources, screen whether ESS7 and FPIC apply. Where required, document a culturally appropriate collective process through institutions selected by affected iTaukei communities, with participation of women, youth and potentially excluded rights-holders. Do not infer FPIC solely from approvals by TLTB, agencies or individual owners.</p><p>&bull; Where applicable, confirm and document eligibility cut-off dates, culturally appropriate public notice, valuation and compensation or benefit methodology, replacement-cost consistency, implementation status, grievances and corrective actions.</p><p>&bull; Conclude for each arrangement whether ESS5 criteria are demonstrated and identify any additional instrument, remedial action, responsible party and completion deadline required before access or civil works.</p><p>e. Integrated Stakeholder Engagement Plan</p><p>&bull; Prepare a project-level SEP consistent with ESS10, including stakeholder analysis, differentiated engagement for disadvantaged or vulnerable groups, disclosure, responsibilities, schedule, monitoring and reporting.</p><p>&bull; Include a culturally appropriate consultation plan for communities potentially affected by solar PV/BESS and associated infrastructure, covering languages, timing, representation, feedback, land arrangements, benefit sharing and any ESS7 FPIC process.</p><p>&bull; Establish an accessible project grievance mechanism and a confidential, survivor-centered SEA/SH reporting and referral pathway.</p><p>f. Labor Management Procedures</p><p>&bull; Prepare LMP consistent with ESS2 for direct, contracted, community and primary supply workers, including applicable law and gaps, terms and conditions, OHS, emergency preparedness, accommodation, labor influx, child and forced labor, PV/BESS supply-chain due diligence, codes of conduct, worker grievances, contractor obligations and training.</p><p>g. TOR for Development and Operationalization of EFL&#39;s ESMS</p><p>&bull; Prepare a procurement-ready TOR and supporting inputs for a separate assignment to develop and operationalize EFL&#39;s institutional ESMS including potential staffing and structure to ensure the ESMS is properly resourced, strategically aligned, and embedded within EFL for lasting effectiveness.</p><p>&bull; Define objectives, scope, methodology, deliverables, schedule, expertise, coordination, knowledge transfer and acceptance criteria. Cover policy and governance; screening; stakeholder, labor, land, biodiversity, pollution, community-safety, cultural-heritage, contractor and supply-chain management; incident response; monitoring; reporting; tools; templates; training; and a time-bound implementation plan.</p><p>&bull; Consult relevant EFL departments. This assignment does not include development or implementation of the ESMS.</p><p>3.3 Policy and Regulatory Support</p><p>&bull; Review proposed amendments to Fiji&#39;s Electricity Act from an E&amp;S perspective, identify gaps with the World Bank ESF and international good practice, and recommend measures for the revised policy.</p><p>&bull; Review the proposed Rooftop Solar PV Policy from an E&amp;S perspective, including potential effects on consumers, community uptake and grid workers.</p><p>&bull; Advise on E&amp;S requirements for private-sector renewable-energy participation, including application of IFC Performance Standards and World Bank ESF requirements to PPP or private-investment components.</p><p>&bull; Assess EFL&#39;s potential for an Environmental and Social Policy and support EFL&#39;s E&amp;S team to derive and implement a practical policy.</p><p>3.4 E&amp;S Inputs to Technical Studies and Infrastructure Components</p><p>&bull; National Control Center Upgrade: identify E&amp;S risks associated with civil works, OHS, asbestos and PCBs, and recommend mitigation for technical specifications.</p><p>&bull; Modernization of Nabouwalu Government Station: conduct site-specific screening, identify community-proximity, worker-community and hazardous-material risks, and prepare an ESMP if required.</p><p>&bull; Aging Infrastructure Rehabilitation: supplement the Component 3 ESMP with screening and, where feasible, inspection of all proposed sub-sites for hazardous materials, cultural heritage and social risks.</p><p>&bull; Power Grid Interconnection, Vanua Levu-Taveuni: support feasibility and engineering studies with environmental and social routing-alternatives analysis and identification of a preferred route based on E&amp;S criteria.</p><p>&bull; Hydropower: prepare assessment TOR requirements covering direct, indirect, induced and cumulative life-cycle impacts across the relevant catchment, including flows, sediment, biodiversity, ecosystem services, water use, livelihoods, land, safety, cultural heritage, associated facilities, alternatives, mitigation, monitoring and adaptive management.</p><p>&bull; Solar PV/BESS Parks: provide E&amp;S inputs to concept designs for two parks of more than 50 MW each, including environmentally and socially informed site-selection criteria and ESF compliance review.</p><p>3.5 Monitoring, Reporting and Disclosure</p><p>&bull; Submit monthly E&amp;S progress reports covering instrument preparation, risk-register actions, engagement, grievances, emerging issues and preparation-phase ESCP commitments.</p><p>&bull; Prepare quarterly stakeholder-engagement summaries.</p><p>&bull; Coordinate disclosure through EFL and other required channels and make accessible copies available to affected communities.</p><p>&bull; Prepare an appraisal-stage E&amp;S readiness summary recording instrument status, review, disclosure, outstanding actions and post-appraisal timelines.</p><p>4. Methodology</p><p>&bull; Desktop review of project, legal, technical and E&amp;S documentation and available baseline data.</p><p>&bull; Structured screening, site visits and physical inspections where feasible.</p><p>&bull; Stakeholder consultations with EFL, government agencies, TLTB, affected communities, technical consultants and the World Bank.</p><p>&bull; Application of the World Bank ESF, ESCP, applicable Fiji law, GIIP and the mitigation hierarchy.</p><p>&bull; Iterative preparation, review and revision of instruments, with clear evidence trails, action tracking and quality assurance.</p><p>&bull; Practical knowledge transfer and on-the-job support to EFL and PPU personnel.</p><p>5. Key Deliverables</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:480px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#005e60; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:1px solid #9eadba; width:182px\"><p><strong>Timeline</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S screening notes for all GFPP-financed activities (rolling)</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 1 week of initiation of each activity</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S Risk Register, initial and updated quarterly</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 1 month of mobilization, then quarterly</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Inputs to ESCP</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As directed by World Bank task team</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S Scoping Studies with Critical Habitat Screening</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>ESMP for Component 3, Aging Asset Replacement</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Resettlement Policy Framework</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Negotiated Land Agreement Due Diligence Report(s)</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Stakeholder Engagement Plan, including consultation plan, project GRM and SEA/SH pathway</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Labor Management Procedures</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>By 15 December</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Procurement-ready TOR and supporting inputs for EFL ESMS assignment</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 3 months of mobilization and in time for procurement</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Advisory notes on Electricity Act amendments and Rooftop Solar PV Policy</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As requested</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S inputs to bidding documents and technical specifications</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>As required by procurement schedule</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>E&amp;S technical input notes for infrastructure studies and components</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>According to relevant technical-study schedule</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Monthly E&amp;S progress reports</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Monthly</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Quarterly stakeholder-engagement summaries</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Quarterly</p></td></tr><tr><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>ESF capacity-building and on-the-job training program, materials and attendance records</p></td><td style=\"background-color:#f2f6f8; border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Within 2 months of mobilization, then as required</p></td></tr><tr><td style=\"border-bottom:1px solid #9eadba; border-left:1px solid #9eadba; border-right:1px solid #9eadba; border-top:none; width:480px\"><p>Disclosure record and consolidated Appraisal-Stage E&amp;S Readiness Summary</p></td><td style=\"border-bottom:1px solid #9eadba; border-left:none; border-right:1px solid #9eadba; border-top:none; width:182px\"><p>Before appraisal, updated as required</p></td></tr></tbody></table><p><em>All deliverables shall be submitted in English, professionally edited, and formatted in accordance with any World Bank templates provided.</em></p><p>6. Reporting and Coordination</p><p>The E&amp;S Specialist will report to the PPU Project Manager on a day-to-day basis. For technical E&amp;S matters, the Specialist will coordinate closely with World Bank E&amp;S Specialists and participate in World Bank supervision missions and project-preparation meetings.</p><p>The Specialist will also coordinate with:</p><p>&bull; EFL&#39;s full-time Environmental Officer and Social Officer, once recruited;</p><p>&bull; GFPP technical consultants in engineering, energy and finance;</p><p>&bull; iTaukei Land Trust Board on land-tenure and customary-engagement matters;</p><p>&bull; Department of Environment and other relevant Fiji government agencies; and</p><p>&bull; external E&amp;S consultants engaged for specialized studies.</p><p>7. Required Qualifications and Experience</p><p>7.1 Education</p><p>&bull; University degree, at minimum Bachelor&#39;s level, in environmental science, social science, natural-resource management, engineering or a closely related field. A postgraduate qualification in environmental or social assessment is strongly preferred.</p><p>7.2 Professional Experience</p><p>&bull; At least seven years of relevant experience in E&amp;S assessment and management for infrastructure or energy projects.</p><p>&bull; Demonstrated application of the World Bank ESF or IFC Performance Standards and preparation of ESMPs, land or resettlement instruments, SEPs/GRMs and LMPs.</p><p>&bull; Experience in biodiversity and critical-habitat screening, ESS5 land and resettlement due diligence, and ESS7 engagement and FPIC.</p><p>&bull; Experience with hazardous materials, renewable energy, grid infrastructure or power generation is desirable.</p><p>&bull; Pacific or Fiji experience, including familiarity with iTaukei land tenure and governance, is strongly preferred.</p><p>&bull; Strong writing, coordination, consultation and capacity-building skills in multicultural settings.</p><p>8. Duration and Location</p><p>&bull; Duration: Part-time for the full GFPP implementation period, estimated at [24 months], subject to satisfactory performance and GFPP availability.</p><p>&bull; Location: Remote-based, with regular travel to project sites on Vanua Levu, Taveuni and other islands as required for scoping, consultation and supervision.</p>"}]}