{"rows":20,"os":"0","page":"1","total":"1837","procnotices":[{"id":"OP00465393","notice_type":"Request for Expression of Interest","noticedate":"27-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-14T00:00:00Z","submission_deadline_time":"07:00","project_ctry_name":"Pacific 1","project_id":"P502591","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","bid_reference_no":"FJ-PIFS-567204-CS-INDV","bid_description":"Kiribati - Project Country Coordinator","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ratu Sukuna Road, Suva, Fiji.","contact_ctry_name":"Fiji","contact_email":"ajayj@forumsec.org","contact_name":"Ajay Jagannath","contact_organization":"Pacific Island Forum Secretariat","contact_phone_no":"679-3312600","contact_web_url":"www.forumsec.org","submission_date":"2026-08-27T00:00:00Z","notice_text":"<table cellspacing=\"0\"><tbody><tr><td><p>Project Name</p></td><td><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td><p>Project Number</p></td><td><p>P502591</p><p>https://projects.worldbank.org/en/projects-operations/project-detail/P502591</p></td></tr><tr><td><p>Activity and Reference Number (STEP)</p></td><td><p><strong>Project Country Co-ordinator - Kiribati&nbsp;FJ-PIFS-567204-CS-INDV</strong></p></td></tr><tr><td><p>Implementing Agency Names</p></td><td><p>Pacific Islands Forum Secretariat</p></td></tr><tr><td><p>Country</p></td><td><p>FIJI</p></td></tr></tbody></table><p>The Pacific Islands Forum Secretariat (PIFS) and seven Pacific Island member countries (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) have received financing (grants and credits) from the World Bank Group&rsquo;s International Development Association (IDA) towards the <em>Pacific Strengthening Correspondent Banking Relationships Project</em> (the Project) and will apply part of these proceeds to the contract below for Consulting Services.</p><p>PIFS is seeking a qualified and experienced <strong>Project Country Coordinator (CC)</strong> to provide incountry coordination support for the implementation of the Project in Kiribati. The Coordinator will assist with the management and delivery of countryspecific project activities, working closely with the Ministry of Finance&rsquo;s designated Country Focal Point (CFP), the Project Management Unit (PMU) in Suva, and other stakeholders.</p><p>This is a parttime individual consultant assignment for up to 144 days per year (maximum 20 days per month), initially contracted for two years with performancebased extensions every two years thereafter until 2030.</p><p><strong>Scope of Services</strong></p><p>Under the overall direction of the PMU Project Coordinator, the Country Coordinator shall undertake the following activities:</p><ul><li>Liaise with the Ministry of Finance&rsquo;s CFP and the Central Bank of Kiribati on project activities, including followup on Project Steering Committee (PSC) meetings and preparation of minutes.</li><li>Support the CFP in developing annual countryspecific work plans and budgets for submission to PIFS/PMU.</li><li>Monitor procurement, financial management, and reporting activities to ensure timely delivery and compliance with World Bank procedures.</li><li>Identify and resolve implementation issues in coordination with the CFP and PMU.</li><li>Review consultant outputs, prepare documentation for payments, and support reporting obligations.</li><li>Prepare annual reports on countryspecific activities for submission to the Ministry of Finance and PIFS.</li><li>Attend scheduled virtual meetings with the PMU and provide weekly reports on work done.</li><li>Undertake any other tasks requested by the CFP or PMU Project Coordinator.</li></ul><p><strong>Mandatory Criteria</strong></p><p><strong>Education</strong></p><ul><li>A bachelor&rsquo;s degree in economics, finance, management, business administration, or a related field.</li></ul><p><strong>Experience</strong></p><ul><li>Minimum of seven (7) years of relevant work experience in international development, financial sector, and/or project management, including previous experience working with projects funded by multilateral development banks.</li></ul><p><strong>Evaluation Criteria</strong></p><p>Applicants passing the mandatory criteria requirements will be assigned points on the following evaluated criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Strong background or experience in the financial/banking sector in either the public or private sector</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Demonstrable experience in organizational and administrative duties in liaising with highlevel stakeholders</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience working in Pacific Island Countries or small island developing countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>High degree of computer literacy, and intermediate to advanced knowledge of Microsoft Office Package (Excel, Word, PowerPoint) and Internet</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20</p></td></tr></tbody></table><p><strong>Language Requirement:</strong> Excellent command of both spoken and written English is required.</p><p>&nbsp;</p><p><strong>PIFS,</strong>&nbsp;on behalf of the participating member countries, now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (attach curriculum vitae and a cover letter with description of experience in similar assignments, similar conditions, etc.).</p><p>Firms&rsquo; staff may express interest through the employing firm for the assignment and, under such situation, only the experience and qualifications of individuals shall be considered in the selection process.</p><p>The attention of interested Consultants (including firms) is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, dated February 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. A Consultant will be selected in accordance with the individual consultant selection method set out in the World Bank Consultant Guidelines</p><p>The detailed Terms of Reference (TOR) for the assignment is attached below and provides details of the scope of the services required along with specific deliverables expected. Further information can be obtained at the address below during office hours 09.00 to 17.00 hrs Fiji Time.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) no later than Monday, September 14, 2026, 17:00 hrs (Fiji Time)</p><p>Address for Enquiries and Submission of EOIs</p><p>Pacific Islands Forum Secretariat</p><p>Attn: Ajay Jagannath, Project Coordinator</p><p>Private Mail Bag, Suva</p><p>PO Box 856, Suva, Fiji.</p><p>Tel: 679-3312600</p><p>E-mail: cbrprocurement@forumsec.org&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>____________________________________________________________________________________________________________________________________________________________________________</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>CONSULTING SERVICES &ndash; INDIVIDUAL SELECTION</strong></p><p><strong>PROJECT COUNTRY COORDINATOR</strong></p><p><strong>KIRIBATI</strong></p><ol><li><strong>Project Overview</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9e2f3; border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:1px dotted #538135; vertical-align:top\"><p><strong>Project Overview&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Project Name</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>PACIFIC STRENGTHENING CORRESPONDENT BANKING RELATIONSHIPS PROJECT</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Activity Reference Number (STEP) </strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; width:425px\"><p><strong>FJ-PIFS-567204-CS-INDV</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Position Title </strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>PROJECT COUNTRY CO-ORDINATOR (CC)</p><p><strong>KIRIBATI</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Location of role</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The position will be based in his/her home country.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Eligibility</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p><strong>Must have the legal right to live and work in</strong><strong> Kiribati</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Implementing Agency on behalf of participating countries</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>Pacific Islands Forum Secretariat (PIFS)</p><p>https://forumsec.org/</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Duration of Assignment</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>This is a part-time work assignment, in line with the project timeline; <strong>A contract (part-time with a total of 144 days in and year and a maximum of 20 days per month) will initially be signed for two years with a performance based extension every two years thereafter, until 2030</strong>. The CC&rsquo;s services shall be subject to an annual performance evaluation based on performance indicators specified in the Terms of Reference below. Performance evaluation shall be the basis for the extension or termination of the services. The selected CC is expected to work in his/her home country and will be supported by the PMU based in Suva, Fiji.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Agency Description</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges, and foster collaboration and cooperation in the pursuit of shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources and the alignment of policies, furthering Forum members shared goals of economic growth, sustainable development, good governance and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions and agree on policies that will benefit the people of the region.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Participating Countries</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Pacific Island Countries (PICs) participating in the regional project comprise Fiji, Kiribati, the Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Overall Project Objective</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Project development Objective is to enable continuous access to correspondent banking services in the participating Pacific Island Countries</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Project Length</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>August 2024 to September 30 2030</p></td></tr></tbody></table><p><strong>2. Project Background</strong></p><p>The Pacific Island Forum Secretariat (PIFS) is expecting to receive financing from the World Bank (WB) Group&rsquo;s International Development Association (IDA) for a proposed project to enable continuous access to correspondent banking services in Pacific Island Countries (PICs).&nbsp; The PICs covered by the proposed regional project (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) include diverse island economies facing similar correspondent banking relationship challenges.</p><p>PICs range in size and topography &ndash; from small island states such as Samoa, with two principal inhabited volcanic islands, to large archipelagos such as the Republic of the Marshall Islands (RMI), with 29 atolls spread over 2 million km2 of ocean. Population sizes vary from 11,300 people in Tuvalu to 930,000 people in Fiji.</p><p>The economic landscape of PICs is equally diverse, marked by different growth drivers, poverty rates, and growth trajectories. The average GDP growth across PICs decelerated to 3.5 percent in 2023 after a historically high of 7.9 percent in 2022, in a rebound from the COVID-19 crisis. However, medium-term growth prospects have worsened, with output growth expected to be significantly below the pre-pandemic trend of 4.7 percent between 2014 &amp; 2019. Given low growth and limited employment opportunities in the island economies, labor migration to neighboring countries and the resulting remittances are critical drivers of living standards.</p><p>The United States, New Zealand, and Australia account for 94 percent of the Pacific diaspora. Trade and tourism are vital for many PICs, providing revenue and employment opportunities. Remittances, equivalent to more than 40 percent of GDP in some PICs, are a buffer against income shocks and an important source of finance for essential household consumption and human capital investment.</p><p>Financial systems in PICs are characterized by low levels of financial access and an uneven development of national payment systems. Both domestically owned and multinational commercial banks dominate the financial sector in all PICs.&nbsp; In several PICs, much of the population lacks access to basic transaction accounts, limiting households and businesses&rsquo; ability to send and receive payments, save, invest, and respond to climatic and economic shocks. The financial market infrastructure is underdeveloped, in part due to limited competition and the lack of economies of scale. The level of national payment system development is uneven across PICs, and regional efforts to improve the efficiency of cross-border payments are limited in scale and scope.</p><p>PICs are uniquely vulnerable to the withdrawal of the correspondent banking relationships (CBR) that underpin international trade, tourism, remittances, and humanitarian financial flows. Correspondent banking is an arrangement under which one bank (correspondent) holds deposits owned by other banks (respondents) and provides payment and other services to those respondent banks. CBRs are an essential feature of the global payment system &ndash; they enable individuals, businesses, and governments to make and receive cross-border payment services related to remittances, e-commerce, trade, and official sector flows. The cross-border transactions enabled in PICs are in various currencies, primarily the US dollar, Euro, and Australian dollar.</p><p>The withdrawal of CBRs, a well-documented global phenomenon affecting many emerging markets and developing economies, has adverse consequences and negative externalities for Pacific Islanders, including seasonal laborers, small and medium enterprises (SMEs), and vulnerable populations. Based on publicly available data, the number of active correspondents for Pacific banks has declined significantly since 2011 to levels that put the Pacific financial system overall at risk.</p><p>In order to mitigate the issues identified above, the WB will provide funding to the Pacific Islands Forum Secretariat (PIFS) to implement the proposed &ldquo;Pacific Strengthening Correspondent Banking Relationships Project&rdquo;.&nbsp; The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges and foster collaboration and cooperation in pursuing shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources, and the alignment of policies, furthering Forum members&#39; shared goals of economic growth, sustainable development, good governance, and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp;&nbsp;&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions, and agree on policies that will benefit the people of the region.</p><p>The project will have two components: (1) Temporary correspondent banking services and (2) Enabling environment and regulatory harmonization.&nbsp; The proposed project will be implemented by a Project Management Unit (PMU) within the PIFS with strategic project oversight provided by a Project Steering Committee (PSC) comprised of representatives of participating Pacific Finance Ministers. While the PMU will be responsible for day-to-day project activities, it will need to ensure close collaboration and coordination with participating Ministries of Finance, which will oversee project activities and approve work plans through the PSC.</p><p>Comprising of Secretaries of Finance or other officials from the participating PICs finance ministries and the PIFS Director (Programs and Initiative), the PSC will meet on a quarterly basis and be responsible for the approval of key project activities as needed. The PSC will report to Pacific Finance Ministers annually at the Forum Economic Minister Meeting (FEMM) to ensure that strategic guidance and orientation are provided over the project activities. At the technical level, each participating PIC will be required to nominate a competent&nbsp;&nbsp; government official as a Country Focal Point (CFP) responsible for project coordination at the national level, who will be designated as the point of contact with the PMU and the WB team.</p><p>The competent government official in each PIC will be complemented by a <strong>country coordinator (CC) based in-country</strong>, recruited through the PMU, and responsible for coordinating service delivery at the individual country level.</p><p>The PIFS is now seeking qualified and competent national consultants from each member country to be the <strong>country coordinator (CC)</strong> for the PMU and based in the respective participating Pacific Island countries (PICs).&nbsp; The required positions are expected to be selected by the PIFS in accordance with the WB&rsquo;s &lsquo;Procurement Regulations for Investment Project Financing (IPF) Borrowers&rsquo; (Procurement Regulations), Seventh edition, September 2025, and as amended over time.</p><p><strong>3. Objective of the Position</strong></p><p>The main objective of the CC would be to&nbsp;provide on the ground support to the PMU in managing and coordinating&nbsp;the full range of project, country specific activities. The CC will be funded by the project (through the PMU) and report to the PIFS/ PMU Coordinator.&nbsp; In addition, he/she will work closely with the specific Country Focal Point (CFP), a government official appointed by the MOF of that particular PIC.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>4. Scope of Services</strong></p><p>The CC will be required to adopt a flexible approach to coordinate and facilitate the required country specific project activities and report on tangible outcomes in terms of project implementation progress. The CC will be required to work in a pro-active manner, and to help ensure effective implementation of activities and delivery of outputs in a timely manner.</p><p>The selected CC will undertake the following services:</p><ol><li>Liaising with PICs Ministry of Finance&rsquo;s CFP and Central Bank on country specific project related activities, including follow up on the Project Steering Committee (PSC) meetings and preparing meeting minutes as required;</li><li>Work in close coordination with the CFP in developing the annual country specific activities, budgets to be submitted to the PIFS/PMU;</li><li>Follow up closely on all country specific procurement activities to ensure that there are no delays in the selection process;</li><li>In coordination with the CFP, identifying problems/impediments promptly as they arise during project implementation and take timely remedial actions;</li><li>Monitoring, with assistance of the PMU M&amp;E specialist, the progress of the country specific project activities and its results indicators;</li><li>Follow up closely on all country specific financial management activities to ensure that there are no delays in the payment process;</li><li>Follow up closely on the country specific activities and report to the CFP and the PMU Project Coordinator;</li><li>Work closely with the CFP and review reports/outputs prepared by selected consultants and provide inputs to the CFP as required;</li><li>Prepare the required documentation for the payment of outputs prepared by the selected consultants, obtain CFP approval and submit documents to the PMU for payment;</li><li>Work closely with the CFP in preparing annual reports on country specific activities to be submitted to the MOF and PIFS; and</li><li>Any other activities as requested by the CFP or the PMU Project Coordinator.</li></ol><p>&nbsp;</p><p><strong>5. Reporting Obligations</strong></p><p>The CC will attend scheduled virtual meetings with the PMU and provide weekly reports on work done.</p><p><strong>6. Institutional Arrangements</strong></p><p>This is a part-time work assignment, with the Consultant expected to be based in in their home country. The Consultant will be supported by the PIFS PMU based in Suva, Fiji but will work closely with and report to the country focal person in the first instance. The CC is expected to show flexibility in working arrangements as time inputs will fluctuate based on country requirements. The work will be part-time, averaging approximately 12 days per month (with a total of 144 days in and year and a maximum of 20 days per month) for the next six years. A contract will initially be signed for two years with a performance-based extension every two years thereafter. Performance evaluation shall be the basis for the extension or termination of the services. Facilities such as office space, intercom telephone facilities, personal computers, printing facilities, Internet access and stationery shall be the responsibility of the Country Coordinator.</p><p>&nbsp;</p><p><strong>7. Performance Indicators</strong></p><p>The following performance indicators shall be used for performance assessment:</p><ol><li>Positive progress and good performance of the entrusted project activities, as per the TOR;</li><li>Ensuring that WB processes and procedures are complied with in all activities and in accordance with the POM;</li><li>Provide and maintain strategic engagement, networking and collaboration with key stakeholders;</li><li>Ensure the utilization and management of project funds are in compliance with the Financing Agreement;</li><li>Ensure the collection of all data required to track project progress;</li><li>Ensure the project monitoring and reporting timeline is adhered to;</li><li>Prepare and compile periodic semi-annual and annual reports on project activities</li><li>Compile proposed annual workplan for the following year with budget and procurement plan;</li><li>Positive evaluation of performance by the PIFS and the WB team;</li><li>Effective management of other experts engaged by the PMU; and</li><li>Support in implementing any capacity building agendas related to the Project as required.</li></ol><p>&nbsp;</p><p><strong>8. Confidentiality and Conflict of Interest</strong></p><p>The CC undertakes to comply with PIF&rsquo;s and WB&rsquo;s policies and rules with regard to anti-corruption and prevention of fraudulent practices, conflict of interest and confidentiality. The CC shall maintain confidentiality on all sensitive information obtained during the assignment and shall not publish wholly or in part the findings or such information, without prior written consent by the PIF. Any draft reports and other documents produced by the consultant will be discussed and cleared with the PIF and the WB before their final issue. A non-disclosure agreement (NDA) will be signed between the PIFS and the selected candidate to be attached to the contract.</p><p>&nbsp;</p><p><strong>9. Evaluation Requirements</strong></p><p>This section details the basis upon which selection of the successful candidate will be based.</p><p><strong>Mandatory Criteria &ndash; </strong>These criteria <strong>must</strong> be met in order to be considered for this contract.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:642px\"><thead><tr><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:186px\"><p><strong>Mandatory Criteria</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:314px\"><p><strong>Description</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:141px\"><p><strong>Evaluation</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:186px\"><p><strong>Education</strong></p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:314px\"><p>A bachelor&rsquo;s degree in economics, finance, management, business administration, or a related field</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:141px\"><p>Pass or Fail</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:186px\"><p><strong>Experience</strong></p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:314px\"><p>A minimum of seven (7) years of relevant work experience in international development, financial sector, and/or project management, including previous experience working with projects funded by multilateral development banks.</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:141px\"><p>Pass or Fail</p></td></tr></tbody></table><p><strong>Scoring Criteria &ndash; </strong>These criteria are requirements or qualities that are not mandatory but would be considered beneficial if they are met and will be assigned scores during evaluation.&nbsp; Applicants must detail, in (their) CVs previous positions which support the criteria requirement on experience. Supporting documentation should be provided where necessary.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:660px\"><thead><tr><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; width:66px\"><p><strong>Criteria </strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; width:528px\"><p><strong>Evaluated Criteria</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; vertical-align:top; width:66px\"><p><strong>Points</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; width:66px\"><p>1</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:528px\"><p>A strong background or experience in the financial/banking sector in either the public or private sector would be desirable;</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:66px\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; width:66px\"><p>2</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:528px\"><p>Demonstrable experience in organizational and administrative duties in liaising with high level stakeholders</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:66px\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; width:66px\"><p>3</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:528px\"><p>Experience working in Pacific Islands Countries or small island developing countries would be an advantage;</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:66px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; width:66px\"><p>4</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:528px\"><p>High degree of computer literacy, and intermediate to advanced knowledge of Microsoft Office Package (Excel, Word, and Power Point) and Internet; and</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; vertical-align:top; width:66px\"><p>20</p></td></tr></tbody></table><p><strong>Language:</strong> Excellent command of both spoken and written English is required</p><p>&nbsp;</p><p><strong>10. Selection Process</strong></p><p>Selection will follow the Selection of an Individual Consultant, World Bank Procurement Regulations Seventh Edition, September 2025.</p><p>Applicants will be assessed on their Resume as submitted and any supporting documentation.</p><p>Applicants who do not pass <strong>Mandatory criteria</strong> requirement will not be evaluated further.</p><p>Applicants passing mandatory criteria requirements will be assigned points on presented <strong>scoring criteria</strong>.&nbsp;</p><p>The Evaluation committee reserves the right to interview any candidates.</p><p>A minimum of two professional references should be provided.&nbsp;</p><p>The Project values individuality and celebrates difference with a strong commitment to diversity, equality, racial equity, gender, and disability inclusion and strongly encourages people from culturally and diverse communities to apply for this position.</p>"},{"id":"OP00465088","notice_type":"Request for Expression of Interest","noticedate":"27-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-14T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Pacific 1","project_id":"P502591","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","bid_reference_no":"FJ-PIFS-567205-CS-INDV","bid_description":"RMI - Payments System Advisor","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ratu Sukuna Road, Suva, Fiji.","contact_ctry_name":"Fiji","contact_email":"ajayj@forumsec.org","contact_name":"Ajay Jagannath","contact_organization":"Pacific Island Forum Secretariat","contact_phone_no":"679-3312600","contact_web_url":"www.forumsec.org","submission_date":"2026-08-27T00:00:00Z","notice_text":"<p><strong>Request for Expressions of Interest</strong></p><p><strong>(INDIVIDUAL CONSULTING SERVICES)</strong></p><p><strong>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</strong></p><table cellspacing=\"0\"><tbody><tr><td><p>Project Name</p></td><td><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td><p>Project Number</p></td><td><p>P502591</p><p>https://projects.worldbank.org/en/projects-operations/project-detail/P502591</p></td></tr><tr><td><p>Activity and Reference Number (STEP)</p></td><td><p><strong>Payments System Advisor&nbsp;FJ-PIFS-567205-CS-INDV</strong></p></td></tr><tr><td><p>Implementing Agency Names</p></td><td><p>Pacific Islands Forum Secretariat</p></td></tr><tr><td><p>Country</p></td><td><p>FIJI</p></td></tr></tbody></table><p>&nbsp;The Pacific Islands Forum Secretariat (PIFS) and seven Pacific Island member countries (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) have received financing (grants and credits) from the World Bank Group&rsquo;s International Development Association (IDA) towards the <em>Pacific Strengthening Correspondent Banking Relationships Project</em> (the Project) and will apply part of these proceeds to the contract below for Consulting Services.</p><p>PIFS is seeking a qualified and experienced <strong>Payments System Advisor</strong> to provide technical advisory support to the Monetary Authority of the Marshall Islands (MAMI). The Advisor will assist with the establishment of a safe, efficient, inclusive, and scalable national payments system and oversight function, aligned with the CBR Project, the CBR Roadmap, regional harmonization work, and the emerging Pacific Payment Mechanism (PPM).</p><p>The Advisor will work closely with MAMI, PIFS, the World Bank, IMF, and other technical assistance providers to translate IMF recommendations into practical implementation steps for RMI. This is a time-based individual consultant assignment for up to twelve (12) months, with up to 240 working days of input, requiring significant in-country presence in Majuro (50&ndash;60% of input days).</p><p><strong>Scope of Services</strong></p><p>Under the overall direction of the Project Coordinator, the Payments System Advisor shall undertake the following activities:</p><ul><li><p>Review IMF recommendations and prepare a 12month implementation roadmap for MAMI&rsquo;s payments function.</p></li><li><p>Advise on operational setup of payment operations and oversight divisions.</p></li><li><p>Support development of a National Payments Strategy and stakeholder consultations.</p></li><li><p>Provide technical inputs on payment infrastructure modernization, including phased implementation of an Integrated Payment and Clearing System (IPCS).</p></li><li><p>Support payment system oversight, risk-based supervision, and data collection.</p></li><li><p>Assist with stakeholder coordination and establishment of a National Payment Council.</p></li><li><p>Align RMI&rsquo;s work with regional harmonization initiatives and the CBR Project&rsquo;s Component 2 activities.</p></li><li><p>Deliver training, mentoring, and knowledge transfer to MAMI staff.</p></li></ul><p>Mandatory Criteria</p><p><strong>Education</strong></p><ul><li><p>A master&rsquo;s degree in economics, finance, law, public policy, payment systems, information systems, business administration, or a related field.</p></li><li><p>A PhD or advanced professional qualification is preferred.</p></li></ul><p><strong>Experience</strong></p><ul><li><p>Minimum of 10 years of experience in payment systems, financial market infrastructures, central bank payment operations, payment system oversight, digital financial services, remittances, cross-border payments, or correspondent banking.</p></li></ul><p>&nbsp;</p><p><strong>Evaluated Criteria:</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:515px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; height:20px; vertical-align:bottom; white-space:normal; width:450px\"><strong>Evaluated Criteria</strong></td><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:bottom; white-space:normal; width:64px\"><strong>Points</strong></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Demonstrated experience in developing and implementing national payment systems strategies and oversight frameworks</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Experience advising central banks or monetary authorities on payment infrastructure modernization</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Familiarity with international standards (CPMIIOSCO Principles, ISO 20022, risk-based supervision)</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:450px\">Experience in stakeholder consultation and coordination across government, financial institutions, and payment service providers</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr></tbody></table><p>&nbsp;</p><p><strong>PIFS,</strong>&nbsp;on behalf of the participating member countries, now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (attach curriculum vitae and a cover letter with description of experience in similar assignments, similar conditions, etc.).</p><p>Firms&rsquo; staff may express interest through the employing firm for the assignment and, under such situation, only the experience and qualifications of individuals shall be considered in the selection process.</p><p>The attention of interested Consultants (including firms) is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, dated February 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. A Consultant will be selected in accordance with the individual consultant selection method set out in the World Bank Consultant Guidelines</p><p>The detailed Terms of Reference (TOR) for the assignment is attached below and provides details of the scope of the services required along with specific deliverables expected. Further information can be obtained at the address below during office hours 09.00 to 17.00 hrs Fiji Time.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) no later than Monday, September 14, 2026, 17:00 hrs (Fiji Time)</p><p>Address for Enquiries and Submission of EOIs</p><p>Pacific Islands Forum Secretariat</p><p>Attn: Ajay Jagannath, Project Coordinator</p><p>Private Mail Bag, Suva</p><p>PO Box 856, Suva, Fiji.</p><p>Tel: 679-3312600</p><p>E-mail: cbrprocurement@forumsec.org&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; TERMS OF REFERENCE</strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; CONSULTING SERVICES - INDIVIDUAL SELECTION</strong></p><p><strong>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</strong></p><p><strong>Project Overview</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:256px\"><p>Project Name</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:430px\"><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Indicative Activity / Budget Line</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Component 2: Enabling Environment and Regulatory Harmonization - Payment System Oversight and Regulation - Oversight of National Payment Systems</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Activity Reference Number (STEP)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>FJ-PIFS-567205-CS-INDV</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Position Title</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Payments System Advisor to the Monetary Authority of the Marshall Islands (MAMI)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Location of role</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Majuro, Republic of the Marshall Islands, with remote inputs and regular coordination with the Project Management Unit (PMU) in Suva. The assignment is expected to require significant in-country presence in Majuro, estimated at 50-60 percent of total input days. The detailed travel and work schedule will be agreed with PIFS, MAMI and the World Bank through the work plan.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Primary Counterpart</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Monetary Authority of the Marshall Islands (MAMI)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Duration of Assignment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Time-based individual consultant contract for up to twelve (12) months, with up to 240 working days of input. Extension may be considered subject to project needs, budget availability, consultant performance, procurement plan arrangements, and applicable World Bank no-objection requirements. Payments will be based on approved timesheets and eligible reimbursable expenses.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Implementing Agency on behalf of participating countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Pacific Islands Forum Secretariat (PIFS)<br />https://forumsec.org/</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Agency Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges, and foster collaboration and cooperation in the pursuit of shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources and the alignment of policies, furthering Forum members shared goals of economic growth, sustainable development, good governance and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions and agree on policies that will benefit the people of the region.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Selection Method</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>Competitive Selection of an independent individual consultant, subject to procurement plan adjustment, justification, conflict-of-interest review, and World Bank no-objection requirements where applicable.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Agency Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Islands Forum was established to bring together the region to address shared issues and support cooperation. PIF works through regional governance, shared resources and policy alignment to support economic growth, sustainable development, good governance and security. Founded in 1971, it comprises eighteen members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Participating Countries</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Pacific Island Countries participating in the regional project comprise Fiji, Kiribati, the Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu. This assignment provides country-specific support to the Republic of the Marshall Islands under the regional project.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Overall Project Objective</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>The Project Development Objective is to enable continuous access to correspondent banking services in the participating Pacific Island Countries.</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:256px\"><p>Project Length</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p>August 2024 to September 30, 2030</p></td></tr></tbody></table><p><strong>Project Background</strong></p><p>The Pacific Islands Forum Secretariat (PIFS) has received financing from the World Bank Group&#39;s International Development Association (IDA) for the Pacific Strengthening Correspondent Banking Relationships Project. The project supports participating Pacific Island Countries (PICs) to maintain continuous access to correspondent banking services, and to address underlying payment, regulatory and financial integrity constraints that contribute to de-risking in the region.</p><p>PICs are exposed to the withdrawal of correspondent banking relationships (CBRs) that underpin international trade, tourism, remittances, development finance, disaster relief, and humanitarian financial flows. The project provides a short-term CBR safety net while supporting the enabling environment and regional harmonization needed for a medium-term sustainable solution.</p><p>Component 2 of the project, Enabling Environment and Regulatory Harmonization, includes support for Payment System Oversight and Regulation. The relevant activity areas include payment systems regulatory harmonization, oversight of national payment systems, and collection of remittance and gender-disaggregated data on usage of financial services. Component 2 also supports payment systems strengthening, CBR Roadmap implementation, the CBR Resilience Index, and the feasibility work for the Pacific Payment Mechanism (PPM), which aims to aggregate payment flows and improve economies of scale.</p><p>The Republic of the Marshall Islands (RMI) is in the early phase of operationalizing the MAMI. In June 2026, the Governor of MAMI requested support for an advisor to assist with implementation of the Authority&#39;s operationalization strategy, including review and tailoring of recommendations from the IMF Monetary and Capital Markets Department technical assistance report, Operationalizing A New Monetary Authority. The request also highlighted the need to establish the national payment system in alignment with the World Bank CBR Strengthening Project&#39;s payment system harmonization roadmap.</p><p>The IMF report identifies several payment-related priorities for MAMI. These include the development of a National Payments Strategy (NPS), the establishment of payment operations and payment oversight functions, the creation of a stakeholder consultation mechanism and National Payment Council, the preparation of payment operations and oversight procedures, and the design of an Integrated Payment and Clearing System (IPCS) that can combine ACH, RTGS and instant payment functionality in a phased manner. The report also notes that RMI currently has no centralized payment system, that payment services are dominated by checks, that there is no e-money provider, and that electronic payments remain limited outside selected card and POS use cases.</p><p>This assignment is designed as payment systems technical assistance under the CBR Project&rsquo;s Technical Assistance component. It is framed around the project&#39;s Payment System Oversight and Regulation activities and is expected to support MAMI in converting payment-related IMF recommendations into a practical work plan, institutional arrangements, operating procedures, oversight tools, stakeholder coordination mechanisms, and capacity building outputs.</p><p><strong>Objective of the Position</strong></p><p>The main objective of the Payments System Advisor to MAMI is to provide technical advisory support to MAMI for the establishment of a safe, efficient, inclusive and scalable national payments system and payment system oversight function, aligned with the CBR Project, the CBR Roadmap, regional payment system harmonization work, and the emerging design of the PPM.</p><p>The Advisor will review the payment-related findings and recommendations in the IMF MCM report and assist MAMI to translate the relevant payment system recommendations into a practical implementation approach for RMI. This will include helping MAMI distinguish payment system actions from broader central banking, governance, accounting, audit, reserve management, HR, communications and corporate services matters, and sequencing the payment system actions in line with MAMI&rsquo;s institutional capacity, staffing plans and expected operational priorities.</p><p>In doing so, the Advisor will consider the small scale of the RMI financial sector, the dominance of checks, limited electronic payment usage, geographic dispersion, government payment needs, remittance costs, digital financial-service developments, and MAMI&rsquo;s current staffing and institutional capacity.</p><p><strong>Scope of Services</strong></p><p>The selected Payments System Advisor will provide country-level, time-based technical implementation support for RMI on payment system matters. The work will be coordinated with the PIFS PMU, the PIFS Payment Systems Specialist, the World Bank payments team, IMF MCM and other technical assistance providers as relevant. The Advisor will carry out the following tasks, with timing and level of effort agreed through the 12-month implementation work plan and periodic work planning discussions:</p><p>i. Inception, work planning and IMF recommendation mapping</p><ul><li>Review the IMF MCM report, MAMI Act and related institutional materials, the CBR Project Operations Manual, the CBR Roadmap, available PPM materials, and other relevant documents provided by MAMI, PIFS or the World Bank.</li><li>Prepare an inception report that identifies the payment-related recommendations requiring action by MAMI and separates them from broader central banking, governance, accounting, audit, reserve management, HR, communications, and corporate services matters.</li><li>Develop a 12-month implementation roadmap for the establishment of MAMI&rsquo;s national payments function, with milestones, dependencies, counterpart responsibilities, expected outputs, sequencing assumptions, and coordination points with the World Bank, IMF and PIFS. The roadmap should be aligned with MAMI&rsquo;s expected recruitment of the Banking Operations Department Executive Manager and Payment Systems Operations Manager, anticipated around December 2026 to January 2027, so that the Advisor&rsquo;s support helps prepare for, onboard, and transition responsibilities to these key MAMI counterparts.</li><li>Prepare and periodically update the Advisor&rsquo;s own assignment work plan, aligned with the 12-month MAMI implementation roadmap, counterpart availability, agreed priorities, in-country inputs, and monthly or quarterly work planning discussions with MAMI, PIFS and the World Bank.</li><li>Tailor payment system recommendations to the RMI context, including market size, transaction volumes, institutional capacity, staffing constraints, remittance corridors, public sector payment needs, and affordability for banks and end users.</li></ul><p>ii. Establishment of MAMI&#39;s national payments function</p><ul><li>Advise MAMI on the operational setup, sequencing, staffing profile and accountabilities for its national payments function, including the Payment Operations Division (POD) and Payment Oversight and Policy Division (OVD) recommended by the IMF report.</li><li>Provide advice on the separation of payment system operations and payment system oversight responsibilities within MAMI&rsquo;s payments mandate, including reporting lines, decision processes, internal coordination arrangements, and safeguards to manage potential conflicts between operational and oversight functions.</li><li>Prepare a short skills and capacity building plan for MAMI staff involved in payment operations, payment oversight, payment &nbsp;&nbsp;&nbsp; &nbsp;collection, and stakeholder engagement.</li><li>Assist MAMI to define working procedures and decision flows for its payment system operational and oversight functions, including issue escalation, internal reporting, consultation with supervised or participating institutions, coordination with IT, risk, legal and supervision functions, and referral of matters requiring specialist technical or legal input.</li></ul><p>&nbsp;</p><p>iii. National Payments Strategy</p><ul><li>Support MAMI to develop a National Payments Strategy that sets out a phased modernization agenda for RMI&rsquo;s national payment system, aligned with the National Financial Inclusion Strategy and coordinated with related work under the CBR Project, regional payment system harmonization agenda, and emerging PPM design.</li><li>Prepare or support a baseline diagnostic covering domestic and cross-border payment flows, CBRs, government payments, remittances, check usage, card and POS usage, payment access, digital infrastructure, consumer needs, and data gaps.</li><li>Identify practical measures to increase use of electronic payments, reduce reliance on checks and cash where appropriate, improve government payment flows, support remittance cost reduction, and expand access to payment services for businesses, households and the public sector.</li><li>Support stakeholder consultations on the NPS, including preparation of consultation materials, meeting notes, issue logs and revisions to the strategy based on feedback received.</li></ul><p>iv. Payment infrastructure and IPCS implementation support</p><ul><li>Advise MAMI on a fit-for-purpose and phased approach to payment infrastructure modernization, including the IMF recommendation for an Integrated Payment and Clearing System combining ACH, RTGS and instant payment functionality.</li><li>Advise MAMI on the preparation, review and sequencing of high-level business requirements and implementation planning for any future IPCS, including initial electronic clearing for wire transfers and checks, check truncation, settlement arrangements, participant onboarding, service levels, operating schedules and support arrangements. The Advisor will help MAMI frame the requirements and coordinate specialist inputs but will not be responsible for preparing detailed technical specifications or system design documents unless separately agreed with PIFS, MAMI and the World Bank.</li><li>Assess the sequencing of ACH, RTGS and instant payment functionality based on RMI transaction volumes, costs, operational readiness, risk profile and user needs.</li><li>Advise MAMI on the issues that should be considered when planning future payment infrastructure, including payment messaging, straight-through processing, ISO 20022 readiness, data security, operational resilience, business continuity, disaster recovery, liquidity risk, settlement risk and participant default arrangements. Where detailed technical design is required, the Advisor will help MAMI identify the issues, review options, and coordinate inputs from specialist payment infrastructure, IT, cybersecurity or World Bank experts.</li><li>Provide payment system technical inputs to procurement documents, concept notes or options papers for the IPCS, as requested by MAMI and the PMU, subject to World Bank procurement rules and conflict-of-interest restrictions.</li></ul><p>v. Payment system oversight, data and risk-based supervision</p><ul><li>Support MAMI to define a payment system oversight framework covering objectives, scope, standards, tools, reporting, escalation, corrective actions and coordination with other MAMI functions.</li><li>Advise MAMI on the scope, structure and phased development of oversight procedures for risk-based monitoring of payment systems and payment service providers, including e-money and non-bank PSPs where relevant. The Advisor may prepare outlines, review drafts and support capacity building, but detailed supervisory manuals, examination procedures or legal instruments should be developed with appropriate specialist and legal input as required.</li><li>Advise MAMI on the payment data and indicators that should be collected for oversight and policy purposes, including payment volumes and values, failed transactions, settlement incidents, fraud, customer complaints, operational incidents, participation, concentration, liquidity risk, credit risk and operational risk. The Advisor may support the development or review of reporting templates in coordination with MAMI, PIFS and the World Bank, but the final templates should be agreed by MAMI and aligned with wider project data requirements.</li><li>Provide technical inputs to and reviews of payment-related regulations, rules, circulars or supervisory guidance as requested, including on electronic payments, PSPs, system participation and operational risk. This role does not include drafting primary payment system legislation or formal legal opinions.</li><li>Align oversight tools with relevant international standards and guidance, including the CPMI-IOSCO Principles for Financial Market Infrastructures, ISO 20022, risk-based supervision practices, consumer protection principles and cyber-resilience expectations applicable to payment systems.</li><li>Review USDM1-related payment system implications, considering existing RMI AML laws and regulations and MAMI&rsquo;s current regulatory treatment of USDM1, and advise on whether any payment system oversight, interoperability, reporting, operational risk, consumer safeguard or AML/CFT coordination measures should be reflected in MAMI&rsquo;s national payment system framework. The Advisor will not provide advice on the sovereign debt, securities law, issuance, redemption, collateral, reserve management or investment aspects of USDM1 except where these issues directly affect payment system oversight or integration.</li></ul><p>vi. Coordination, consultation and National Payment Council support</p><ul><li>Assist MAMI to establish a consultation mechanism with banks, government agencies, SOEs, card schemes, telecom operators, payment service providers, major users and other stakeholders involved in payments modernization.</li><li>Prepare draft Terms of Reference, membership options, work program and first-year agenda for a National Payment Council or equivalent advisory body.</li><li>Support MAMI in coordinating with the Ministry of Finance on payment-related services, including government payment flows, account information, reporting expectations, service levels, and inputs to any payment-related SLA or MOU arrangements.</li><li>Prepare stakeholder maps, consultation papers, meeting agendas, minutes and action trackers to support implementation of the national payments work plan.</li></ul><p>vii. Alignment with the CBR Project and regional work</p><ul><li>Coordinate closely with the PIFS PMU, PIFS Payment Systems Specialist and World Bank payments team to align RMI support with the CBR Project&#39;s Component 2 work program.</li><li>Support RMI inputs into CBR data collection, the CBR Resilience Index and the PPM feasibility and design process, including payment flow data, remittance information, CBR information and stakeholder feedback.</li><li>Assist MAMI to collect and improve relevant remittance and gender-disaggregated data on the usage of financial services, where feasible and agreed with the PMU and World Bank.</li><li>Identify areas where RMI can participate in regional harmonization work, including PSP licensing, QR code standards, open banking/open finance, cross-border interoperability and common principles for cross-border data sharing.</li><li>Coordinate with IMF MCM and other technical assistance providers, through MAMI, PIFS and the World Bank as appropriate, to reduce duplication, sequence inputs, and keep the assignment focused on payment system matters within the agreed CBR Project scope. Where feasible, the Advisor may support periodic coordination discussions, including around the Annual Meetings or Spring Meetings, if requested by MAMI, PIFS or the World Bank.</li></ul><p>viii. Capacity building and knowledge transfer</p><ul><li>Identify MAMI staff training needs, develop a multi-year training plan, and identify opportunities for training and knowledge transfer aligned with MAMI&rsquo;s payment system mandate, staffing plan and future development priorities.</li><li>Prepare training materials, practical templates and work aids that MAMI staff can continue to use after the assignment.</li><li>Identify peer learning opportunities with regional central banks or payment system operators, including short technical exchanges or virtual clinics where appropriate.</li><li>Provide mentoring to assigned MAMI counterparts and support handover of tools, procedures and work plans before the end of the assignment.</li></ul><p><strong>Scope Exclusions</strong></p><p>The assignment is limited to payment systems technical assistance and payment-related operationalization of MAMI. The Advisor will not draft the Payment Systems Act, amendments to the Monetary Authority Act, primary legislation, or formal legal opinions.</p><p>The Advisor will not provide general central bank advisory services on reserve management, fiscal agency, accounting, audit, human resources, communications, procurement, general governance, or corporate services except where those topics directly affect payment system operations, payment oversight, payment infrastructure or payment-related stakeholder coordination.</p><p><strong>Time-Based Reporting Obligations and Expected Outputs</strong></p><p>This assignment will be contracted on a time-based basis. Payments will be linked to approved timesheets, agreed input days, and eligible reimbursable expenses, not to a fixed-price deliverables schedule. The outputs listed below are expected working products and reporting instruments for managing the assignment, tracking progress, supporting quality review, and documenting knowledge transfer.</p><p>The Advisor will prepare and update working products in line with the agreed work plan and counterpart needs. These may include the inception note and 12-month payments work plan, IMF recommendation mapping, National Payments Strategy materials, payment function setup notes, National Payment Council materials, payment operations and oversight procedures, data templates, IPCS options and requirements notes, training materials, mission notes and handover materials.</p><p>Because the role is advisory and embedded with MAMI for a substantial part of the assignment, outputs may be revised or reprioritized during implementation with agreement from MAMI, PIFS and the World Bank. The Advisor will document changes through monthly activity notes, quarterly progress notes and the action tracker.</p><p><strong>Reporting Obligations</strong></p><p>The Payments System Advisor will work closely with MAMI on a day-to-day technical basis and will report administratively to the Project Coordinator within the PIFS PMU. Technical priorities, work planning, and expected outputs will be agreed with MAMI, PIFS and the World Bank payments team. The Advisor will also coordinate with the PIFS Payment Systems Specialist and the RMI Country Coordinator as relevant.</p><p>The Advisor will submit monthly timesheets and short monthly activity notes to the PIFS PMU, with confirmation from MAMI of the main activities undertaken. The monthly activity note should summarize days worked, in-country and remote inputs, meetings held, outputs prepared, issues requiring decision, and planned activities for the following month. Technical outputs will be shared with MAMI and PIFS, and PIFS will share them with the World Bank for review or no-objection where required under the project arrangements.</p><p>The Advisor will maintain a short action tracker covering agreed activities, responsible counterparts, due dates, risks, dependencies and decisions required. The tracker will be updated at least monthly, and more frequently if requested by the PMU or MAMI. The Advisor will also provide quarterly progress notes against the 12-month payments work plan and a final completion and handover note at the end of the assignment.</p><p><strong>Institutional Arrangements</strong></p><p>This is a time-based individual consultant assignment contracted by PIFS through the PMU under the Pacific Strengthening CBR Project. The assignment will be undertaken for the benefit of MAMI as the primary country counterpart. The procurement approach is competitive selection of an independent individual consultant, subject to the approved procurement plan, applicable PIFS procurement procedures, conflict-of-interest review, and World Bank review or no-objection requirements where applicable.</p><p>The Advisor is expected to spend significant time in Majuro during the assignment, estimated at 50-60 percent of total input days, especially during inception, stakeholder consultations, NPS preparation, payment function setup, capacity building and infrastructure planning. Remote work may be used for document preparation, virtual meetings, training, follow-up and coordination with PIFS and the World Bank.</p><p>Office space and access to meeting facilities may be provided by MAMI for in-country inputs and by PIFS for inputs in Suva, subject to availability. The Advisor will be responsible for maintaining secure records of documents, correspondence and data received during the assignment and for complying with all confidentiality requirements.</p><p>The Advisor&#39;s services will be subject to periodic performance review based on the performance indicators below. Performance review will inform continuation, extension, revision or termination of the assignment, subject to contract terms and World Bank requirements.</p><p>&nbsp;</p><p><strong>Performance Indicators</strong></p><p>The following performance indicators will be used for contract management and performance assessment. They are intended to measure timely input, quality of advisory support, documented outputs, counterpart engagement and knowledge transfer under a time-based contract:</p><ul><li>Monthly timesheets are submitted on time and accurately distinguish between in country and remote input days.</li><li>Monthly activity notes are submitted on time and summarize work undertaken, meetings held, issues requiring decision, risks, planned next steps and counterpart engagement.</li><li>The Advisor maintains and updates an action tracker covering agreed activities, responsible counterparts, deadlines, dependencies and pending decisions.</li><li>A 12-month implementation roadmap for MAMI&rsquo;s national payments function is prepared, discussed with MAMI, PIFS and the World Bank, and updated as required during implementation.</li><li>The Advisor&rsquo;s own assignment work plan is maintained and aligned with the 12-month MAMI implementation roadmap, MAMI counterpart availability and agreed priorities.</li><li>Payment-related IMF MCM recommendations are mapped and separated from broader central banking, governance, accounting, audit, reserve management, HR, communications and corporate services matters.</li><li>MAMI receives documented advice, meeting notes or working materials on the setup of payment operations and payment oversight responsibilities, including staffing, reporting lines, procedures and capacity needs.</li><li>MAMI is supported in preparing or refining National Payments Strategy materials, consultation inputs and implementation roadmap elements.</li><li>Payment infrastructure advice is documented through advisory notes, review comments or options papers that support a phased and fit-for-purpose approach to any future IPCS, without requiring the Advisor to develop systems or detailed technical specifications.</li><li>Payment system oversight and data work is documented through advisory notes, outlines, review comments, reporting needs, draft structures or training materials, with specialist technical or legal work referred to appropriate experts where required.</li><li>Stakeholder engagement is documented through meeting notes, action trackers, consultation materials or National Payment Council support materials.</li><li>Capacity building activities are documented through training materials, attendance records, mentoring notes or handover materials.</li><li>Quarterly progress notes are submitted against the agreed work plan and discussed with MAMI, PIFS and the World Bank.</li><li>A final completion and handover note is submitted at the end of the assignment, summarizing work undertaken, outputs prepared, remaining actions, open risks and recommended next steps.</li><li>The Advisor maintains professional, objective and impartial advice, avoids conflicts of interest, records input days accurately, and complies with PIFS and World Bank rules on confidentiality, anti-corruption and fraud prevention.</li></ul><p><strong>Confidentiality and Conflict of Interest</strong></p><p>The Payments System Advisor shall comply with PIFS and World Bank policies and rules on anti-corruption, prevention of fraudulent practices, conflict of interest and confidentiality. The Advisor shall maintain confidentiality over all sensitive information obtained during the assignment and shall not publish or disclose any findings, data, reports or recommendations without prior written consent from PIFS and MAMI, and World Bank clearance where required.</p><p>Any draft reports and other documents produced by the Advisor will be discussed with and cleared by PIFS, MAMI and the World Bank before final issue. A non-disclosure agreement may be signed between PIFS, MAMI and the selected consultant and attached to the contract.</p><p>The Advisor must disclose any actual or potential conflict of interest before contract signature and throughout the assignment. The Advisor shall not participate in downstream procurement activities where such participation would create a conflict of interest under the World Bank Procurement Regulations or the Project Operations Manual.</p><p><strong>Evaluation Requirements</strong></p><p><strong>Mandatory Criteria</strong></p><p>This section details the basis upon which selection of the successful candidate will be based.</p><p>These criteria must be met to be considered for this contract.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:133px\"><p>Mandatory Criteria</p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:426px\"><p>Description</p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:103px\"><p>Evaluation</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Education</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>A master&#39;s degree in economics, finance, law, public policy, payment systems, information systems, business administration or a related field. A PhD or other advanced professional qualification is preferred.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Pass or Fail</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p>Experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:426px\"><p>A minimum of 10 years of experience working on payment systems, financial market infrastructures, central bank payment operations, payment system oversight, digital financial services, remittances, cross-border payments, correspondent banking, or financial sector supervision, including senior management experience in a central bank, monetary authority or financial sector authority. The candidate should have held, at minimum, a department-head or equivalent senior management role covering payment system policy, operations, oversight, supervision or related financial sector functions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Pass or Fail</p></td></tr></tbody></table><p><strong>Desirable Qualifications</strong></p><p>These criteria are desirable qualifications that will be considered in confirming the suitability of the proposed consultant and documenting the direct selection justification. Candidates who meet the mandatory criteria will be ranked out of 100 points based on the scoring criteria above. The evaluation committee may interview the highest-ranked candidates where clarification is required or where candidates are closely ranked.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:31px\"><p><strong>#</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:594px\"><p><strong>Evaluated Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:61px\"><p><strong>Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Knowledge of the economic and financial environment in the Pacific, small island states, or other small and capacity-constrained jurisdictions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience advising central banks or financial sector authorities on National Payments Strategies, payment system modernization, payment operations, payment system oversight, or payment infrastructure implementation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>25</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience with digital financial services, e-money, non-bank payment service providers, remittances, financial inclusion, consumer protection, gender-disaggregated data, or public sector payments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Ability to prepare high-quality strategies, advisory notes, manuals, operating procedures, data templates, training materials and implementation roadmaps.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p>Experience coordinating multi-stakeholder assignments involving central banks, ministries of finance, banks, payment service providers, telecom operators, development partners and regional organizations.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:31px\">&nbsp;</td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:594px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:61px\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong>Language:</strong> Excellent command of both spoken and written English is required</p><p>&nbsp;</p><p><strong>Selection Method</strong></p><ul><li>The consultant will be selected through a competitive selection process for an independent individual consultant, subject to the approved procurement plan and applicable World Bank requirements.</li><li>Selection will follow the Selection of an Individual Consultant, World Bank Procurement Regulations Seventh Edition, September 2025.</li><li>Candidates will be assessed against the mandatory criteria and desirable qualifications set out above, based on CVs, supporting documentation, relevant experience, availability, references, and any interview or written assessment deemed necessary by the evaluation committee.</li><li>Candidates who do not meet the mandatory criteria will not be evaluated further.</li><li>Candidates who meet the mandatory criteria will be ranked based on their demonstrated experience and suitability for the assignment, including payment systems expertise, central bank or monetary authority experience, experience in small or capacity-constrained jurisdictions, ability to provide significant in-country presence in Majuro, and capacity to provide practical advisory and implementation support.</li><li>At least two professional references should be obtained or verified for the preferred candidate before contract signature.</li><li>Contract negotiation with the preferred candidate will confirm the daily fee rate, estimated input schedule, in-country presence plan, reimbursable expenses, confidentiality obligations, reporting arrangements and conflict-of-interest undertakings.</li><li>The final selection will be subject to any required PIFS internal approvals, procurement plan requirements, and World Bank review or no-objection requirements.</li><li>The project values individuality and welcomes candidates from diverse cultural, racial, gender and disability backgrounds.</li></ul>"},{"id":"OP00465368","notice_type":"Request for Expression of Interest","noticedate":"27-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-14T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Pacific 1","project_id":"P502591","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","bid_reference_no":"FJ-PIFS-567203-CS-INDV","bid_description":"Vanuatu - Project Country Coordinator","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ratu Sukuna Road, Suva, Fiji.","contact_ctry_name":"Fiji","contact_email":"ajayj@forumsec.org","contact_name":"Ajay Jagannath","contact_organization":"Pacific Island Forum Secretariat","contact_phone_no":"679-3312600","contact_web_url":"www.forumsec.org","submission_date":"2026-08-27T00:00:00Z","notice_text":"<table cellspacing=\"0\"><tbody><tr><td><p>Project Name</p></td><td><p>Pacific Strengthening Correspondent Banking Relationships Project</p></td></tr><tr><td><p>Project Number</p></td><td><p>P502591</p><p>https://projects.worldbank.org/en/projects-operations/project-detail/P502591</p></td></tr><tr><td><p>Activity and Reference Number (STEP)</p></td><td><p><strong>Project Country Co-ordinator - Vanuatu FJ-PIFS-567203-CS-INDV</strong></p></td></tr><tr><td><p>Implementing Agency Names</p></td><td><p>Pacific Islands Forum Secretariat</p></td></tr><tr><td><p>Country</p></td><td><p>FIJI</p></td></tr></tbody></table><p>&nbsp;</p><p>The Pacific Islands Forum Secretariat (PIFS) and seven Pacific Island member countries (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) have received financing (grants and credits) from the World Bank Group&rsquo;s International Development Association (IDA) towards the <em>Pacific Strengthening Correspondent Banking Relationships Project</em> (the Project) and will apply part of these proceeds to the contract below for Consulting Services.</p><p>PIFS is seeking a qualified and experienced <strong>Project Country Coordinator (CC)</strong> to provide incountry coordination support for the implementation of the Project in Vanuatu. The Coordinator will assist with the management and delivery of countryspecific project activities, working closely with the Ministry of Finance&rsquo;s designated Country Focal Point (CFP), the Project Management Unit (PMU) in Suva, and other stakeholders.</p><p>This is a parttime individual consultant assignment for up to 144 days per year (maximum 20 days per month), initially contracted for two years with performancebased extensions every two years thereafter until 2030.</p><p>&nbsp;</p><p><strong>Scope of Services</strong></p><p>Under the overall direction of the PMU Project Coordinator, the Country Coordinator shall undertake the following activities:</p><ul><li><p>Lead and coordinate daytoday implementation of project activities in Vanuatu.</p></li><li><p>Liaise with the Ministry of Finance&rsquo;s CFP and the Reserve Bank of Vanuatu on project activities, including followup on Project Steering Committee (PSC) meetings and preparation of minutes.</p></li><li><p>Support the CFP in developing annual countryspecific work plans and budgets for submission to PIFS/PMU.</p></li><li><p>Monitor procurement, financial management, and reporting activities to ensure timely delivery and compliance with World Bank procedures.</p></li><li><p>Identify and resolve implementation issues in coordination with the CFP and PMU.</p></li><li><p>Review consultant outputs, prepare documentation for payments, and support reporting obligations.</p></li><li><p>Prepare annual reports on countryspecific activities for submission to the Ministry of Finance and PIFS.</p></li><li><p>Undertake any other tasks requested by the CFP or PMU Project Coordinator.</p></li></ul><p>&nbsp;</p><p><strong>Mandatory Criteria</strong></p><p><strong>Education</strong></p><ul><li><p>A bachelor&rsquo;s degree in economics, finance, management, business administration, or a related field.</p></li></ul><p><strong>Experience</strong></p><ul><li><p>Minimum of seven (7) years of relevant work experience in international development, financial sector, and/or project management, including previous experience working with projects funded by multilateral development banks.</p></li></ul><p>&nbsp;</p><p><strong>Evaluation Criteria</strong></p><p>Applicants passing the mandatory criteria requirements will be assigned points on the following evaluated criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:583px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; height:20px; vertical-align:bottom; white-space:normal; width:519px\"><strong>Criteria</strong></td><td style=\"background-color:#d9d9d9; border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:bottom; white-space:normal; width:64px\"><strong>Points</strong></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:519px\">Strong background or experience in the financial/banking sector in either the public or private sector</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:519px\">Demonstrable experience in organizational and administrative duties in liaising with highlevel stakeholders</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">30</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:519px\">Experience working in Pacific Island Countries or small island developing countries</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; vertical-align:bottom; white-space:normal; width:519px\">High degree of computer literacy, and intermediate to advanced knowledge of Microsoft Office Package (Excel, Word, PowerPoint) and Internet</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; text-align:center; vertical-align:bottom; white-space:normal; width:64px\">20</td></tr></tbody></table><p>&nbsp;<strong>Language Requirement:</strong> Excellent command of both spoken and written English is required.</p><p>&nbsp;</p><p><strong>PIFS,</strong>&nbsp;on behalf of the participating member countries, now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (attach curriculum vitae and a cover letter with description of experience in similar assignments, similar conditions, etc.).</p><p>Firms&rsquo; staff may express interest through the employing firm for the assignment and, under such situation, only the experience and qualifications of individuals shall be considered in the selection process.</p><p>The attention of interested Consultants (including firms) is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, dated February 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. A Consultant will be selected in accordance with the individual consultant selection method set out in the World Bank Consultant Guidelines</p><p>The detailed Terms of Reference (TOR) for the assignment is attached below and provides details of the scope of the services required along with specific deliverables expected. Further information can be obtained at the address below during office hours 09.00 to 17.00 hrs Fiji Time.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) no later than Monday, September 14, 2026, 17:00 hrs (Fiji Time)</p><p>Address for Enquiries and Submission of EOIs</p><p>Pacific Islands Forum Secretariat</p><p>Attn: Ajay Jagannath, Project Coordinator</p><p>Private Mail Bag, Suva</p><p>PO Box 856, Suva, Fiji.</p><p>Tel: 679-3312600</p><p>E-mail: cbrprocurement@forumsec.org&nbsp;&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>_______________________________________________________________________________________________</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>CONSULTING SERVICES &ndash; INDIVIDUAL SELECTION</strong></p><p><strong>PROJECT COUNTRY COORDINATOR</strong></p><p><strong>VANUATU</strong></p><ol><li>Project Overview</li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9e2f3; border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:1px dotted #538135; vertical-align:top\"><p><strong>Project Overview&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Project Name</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>PACIFIC STRENGTHENING CORRESPONDENT BANKING RELATIONSHIPS PROJECT</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Activity Reference Number (STEP) </strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; width:425px\"><p><strong>FJ-PIFS-567203-CS-INDV</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Position Title </strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>PROJECT COUNTRY CO-ORDINATOR (CC)</p><p><strong>VANUATU</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Location of role</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The position will be based in his/her home country.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Eligibility</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p><strong>Must have the legal right to live and work in Vanuatu</strong></p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Implementing Agency on behalf of participating countries</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>Pacific Islands Forum Secretariat (PIFS)</p><p>https://forumsec.org/</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Duration of Assignment</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>This is a part-time work assignment, in line with the project timeline; <strong>A contract (part-time with a total of 144 days in and year and a maximum of 20 days per month) will initially be signed for two years with a performance based extension every two years thereafter, until 2030</strong>. The CC&rsquo;s services shall be subject to an annual performance evaluation based on performance indicators specified in the Terms of Reference below. Performance evaluation shall be the basis for the extension or termination of the services. The selected CC is expected to work in his/her home country and will be supported by the PMU based in Suva, Fiji.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Agency Description</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges, and foster collaboration and cooperation in the pursuit of shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources and the alignment of policies, furthering Forum members shared goals of economic growth, sustainable development, good governance and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions and agree on policies that will benefit the people of the region.</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Participating Countries</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Pacific Island Countries (PICs) participating in the regional project comprise Fiji, Kiribati, the Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Overall Project Objective</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>The Project development Objective is to enable continuous access to correspondent banking services in the participating Pacific Island Countries</p></td></tr><tr><td style=\"border-bottom:1px dotted #538135; border-left:1px dotted #538135; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:217px\"><p><strong>Project Length</strong></p></td><td style=\"border-bottom:1px dotted #538135; border-left:none; border-right:1px dotted #538135; border-top:none; vertical-align:top; width:425px\"><p>August 2024 to September 30 2030</p></td></tr></tbody></table><p><strong>2. Project Background</strong></p><p>The Pacific Island Forum Secretariat (PIFS) is expecting to receive financing from the World Bank (WB) Group&rsquo;s International Development Association (IDA) for a proposed project to enable continuous access to correspondent banking services in Pacific Island Countries (PICs).&nbsp; The PICs covered by the proposed regional project (Fiji, Kiribati, Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu) include diverse island economies facing similar correspondent banking relationship challenges.</p><p>PICs range in size and topography &ndash; from small island states such as Samoa, with two principal inhabited volcanic islands, to large archipelagos such as the Republic of the Marshall Islands (RMI), with 29 atolls spread over 2 million km2 of ocean. Population sizes vary from 11,300 people in Tuvalu to 930,000 people in Fiji.</p><p>The economic landscape of PICs is equally diverse, marked by different growth drivers, poverty rates, and growth trajectories. The average GDP growth across PICs decelerated to 3.5 percent in 2023 after a historically high of 7.9 percent in 2022, in a rebound from the COVID-19 crisis. However, medium-term growth prospects have worsened, with output growth expected to be significantly below the pre-pandemic trend of 4.7 percent between 2014 &amp; 2019. Given low growth and limited employment opportunities in the island economies, labor migration to neighboring countries and the resulting remittances are critical drivers of living standards.</p><p>The United States, New Zealand, and Australia account for 94 percent of the Pacific diaspora. Trade and tourism are vital for many PICs, providing revenue and employment opportunities. Remittances, equivalent to more than 40 percent of GDP in some PICs, are a buffer against income shocks and an important source of finance for essential household consumption and human capital investment.</p><p>Financial systems in PICs are characterized by low levels of financial access and an uneven development of national payment systems. Both domestically owned and multinational commercial banks dominate the financial sector in all PICs.&nbsp; In several PICs, much of the population lacks access to basic transaction accounts, limiting households and businesses&rsquo; ability to send and receive payments, save, invest, and respond to climatic and economic shocks. The financial market infrastructure is underdeveloped, in part due to limited competition and the lack of economies of scale. The level of national payment system development is uneven across PICs, and regional efforts to improve the efficiency of cross-border payments are limited in scale and scope.</p><p>PICs are uniquely vulnerable to the withdrawal of the correspondent banking relationships (CBR) that underpin international trade, tourism, remittances, and humanitarian financial flows. Correspondent banking is an arrangement under which one bank (correspondent) holds deposits owned by other banks (respondents) and provides payment and other services to those respondent banks. CBRs are an essential feature of the global payment system &ndash; they enable individuals, businesses, and governments to make and receive cross-border payment services related to remittances, e-commerce, trade, and official sector flows. The cross-border transactions enabled in PICs are in various currencies, primarily the US dollar, Euro, and Australian dollar.</p><p>The withdrawal of CBRs, a well-documented global phenomenon affecting many emerging markets and developing economies, has adverse consequences and negative externalities for Pacific Islanders, including seasonal laborers, small and medium enterprises (SMEs), and vulnerable populations. Based on publicly available data, the number of active correspondents for Pacific banks has declined significantly since 2011 to levels that put the Pacific financial system overall at risk.</p><p>In order to mitigate the issues identified above, the WB will provide funding to the Pacific Islands Forum Secretariat (PIFS) to implement the proposed &ldquo;Pacific Strengthening Correspondent Banking Relationships Project&rdquo;.&nbsp; The Pacific Islands Forum was established to bring together the region to address pressing issues and challenges and foster collaboration and cooperation in pursuing shared goals. PIF&rsquo;s mandate is to strengthen cooperation and integration in the Pacific region through the pooling of regional governance, resources, and the alignment of policies, furthering Forum members&#39; shared goals of economic growth, sustainable development, good governance, and security. Founded in 1971, it comprises 18 members: Australia, Cook Islands, Federated States of Micronesia, Fiji, French Polynesia, Kiribati, Nauru, New Caledonia, New Zealand, Niue, Palau, Papua New Guinea, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu, and Vanuatu.&nbsp;&nbsp;&nbsp; The PIFS is a vital platform for Leaders to convene, engage in discussions, and agree on policies that will benefit the people of the region.</p><p>The project will have two components: (1) Temporary correspondent banking services and (2) Enabling environment and regulatory harmonization.&nbsp; The proposed project will be implemented by a Project Management Unit (PMU) within the PIFS with strategic project oversight provided by a Project Steering Committee (PSC) comprised of representatives of participating Pacific Finance Ministers. While the PMU will be responsible for day-to-day project activities, it will need to ensure close collaboration and coordination with participating Ministries of Finance, which will oversee project activities and approve work plans through the PSC.</p><p>Comprising of Secretaries of Finance or other officials from the participating PICs finance ministries and the PIFS Director (Programs and Initiative), the PSC will meet on a quarterly basis and be responsible for the approval of key project activities as needed. The PSC will report to Pacific Finance Ministers annually at the Forum Economic Minister Meeting (FEMM) to ensure that strategic guidance and orientation are provided over the project activities. At the technical level, each participating PIC will be required to nominate a competent&nbsp;&nbsp; government official as a Country Focal Point (CFP) responsible for project coordination at the national level, who will be designated as the point of contact with the PMU and the WB team.</p><p>The competent government official in each PIC will be complemented by a <strong>country coordinator (CC) based in-country</strong>, recruited through the PMU, and responsible for coordinating service delivery at the individual country level.</p><p>The PIFS is now seeking qualified and competent national consultants from each member country to be the <strong>country coordinator (CC)</strong> for the PMU and based in the respective participating Pacific Island countries (PICs).&nbsp; The required positions are expected to be selected by the PIFS in accordance with the WB&rsquo;s &lsquo;Procurement Regulations for Investment Project Financing (IPF) Borrowers&rsquo; (Procurement Regulations), Seventh edition, September 2025, and as amended over time.</p><p><strong>3. Objective of the Position</strong></p><p>The main objective of the CC would be to manage and coordinate the full range of project, country specific activities during the project cycle from effectiveness through implementation to completion.&nbsp; The CC will be funded by the project (through the PMU) and report to the PIFS/ PMU Coordinator.&nbsp; In addition, he/she will work closely with the specific Country Focal Point (CFP), a government official appointed by the MOF of that particular PIC.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>4. Scope of Services</strong></p><p>The CC will be required to adopt a flexible approach to coordinate and facilitate the required country specific project activities and report on tangible outcomes in terms of project implementation progress. The CC will be required to work in a pro-active manner, and to help ensure effective implementation of activities and delivery of outputs in a timely manner.</p><ol><li>The selected CC will lead and coordinate the day-to-day implementation of the project activities, including the following:</li><li>Liaising with PICs Ministry of Finance&rsquo;s CFP and Central Bank on country specific project related activities, including follow up on the Project Steering Committee (PSC) meetings and preparing meeting minutes as required;</li><li>Work in close coordination with the CFP in developing the annual country specific activities, budgets to be submitted to the PIFS/PMU;</li><li>Follow up closely on all country specific procurement activities to ensure that there are no delays in the selection process;</li><li>In coordination with the CFP, identifying problems/impediments promptly as they arise during project implementation and take timely remedial actions;</li><li>Monitoring, with assistance of the PMU M&amp;E specialist, the progress of the country specific project activities and its results indicators;</li><li>Follow up closely on all country specific financial management activities to ensure that there are no delays in the payment process;</li><li>Follow up closely on the country specific activities and report to the CFP and the PMU Project Coordinator;</li><li>Work closely with the CFP and review reports/outputs prepared by selected consultants and provide inputs to the CFP as required;</li><li>Prepare the required documentation for the payment of outputs prepared by the selected consultants, obtain CFP approval and submit documents to the PMU for payment;</li><li>Work closely with the CFP in preparing annual reports on country specific activities to be submitted to the MOF and PIFS; and</li><li>Any other activities as requested by the CFP or the PMU Project Coordinator.</li></ol><p>&nbsp;</p><p><strong>5. Reporting Obligations</strong></p><p>The CC will work closely with the Country Focal Person (CFP) and report to the PMU Project Coordinator.</p><p>&nbsp;</p><p><strong>6. Institutional Arrangements</strong></p><p>This is a part-time work assignment, with the Consultant expected to be based in their home country. The Consultant will be supported by the PIFS PMU based in Suva, Fiji but will work closely with and report to the country focal person in the first instance. The CC is expected to show flexibility in working arrangements as time inputs will fluctuate based on country requirements. The work will be part-time, averaging approximately 12&nbsp; days per month (with a total of 144 days in a year and a maximum of 20 days per month) for the next six years. A contract will initially be signed for two years with a performance based extension every two years thereafter. Performance evaluation shall be the basis for the extension or termination of the services. Facilities such as office space, intercom telephone facilities, personal computers, printing facilities, Internet access and stationery will be provided.</p><p>&nbsp;</p><p><strong>7. Performance Indicators</strong></p><p>The following performance indicators shall be used for performance assessment:</p><ol><li>Positive progress and good performance of the entrusted project activities, as per the TOR;</li><li>Ensuring that WB processes and procedures are complied with in all activities and in accordance with the POM;</li><li>Provide and maintain strategic engagement, networking and collaboration with key stakeholders;</li><li>Ensure the utilization and management of project funds are in compliance with the Financing Agreement;</li><li>Ensure the collection of all data required to track project progress;</li><li>Ensure the project monitoring and reporting timeline is adhered to;</li><li>Prepare and compile periodic semi-annual and annual reports on project activities</li><li>Compile proposed annual workplan for the following year with budget and procurement plan;</li><li>Positive evaluation of performance by the PIFS and the WB team;</li><li>Effective management of other experts engaged by the PMU; and</li><li>Support in implementing any capacity building agendas related to the Project as required.</li></ol><p>&nbsp;</p><p><strong>8. Confidentiality and Conflict of Interest</strong></p><p>The CC undertakes to comply with PIF&rsquo;s and WB&rsquo;s policies and rules with regard to anti-corruption and prevention of fraudulent practices, conflict of interest and confidentiality. The CC shall maintain confidentiality on all sensitive information obtained during the assignment and shall not publish wholly or in part the findings or such information, without prior written consent by the PIF. Any draft reports and other documents produced by the consultant will be discussed and cleared with the PIF and the WB before their final issue. A non-disclosure agreement (NDA) will be signed between the PIFS and the selected candidate to be attached to the contract.</p><p>&nbsp;</p><p><strong>9. Evaluation Requirements</strong></p><p>This section details the basis upon which selection of the successful candidate will be based.</p><p><strong>Mandatory Criteria &ndash; </strong>These criteria <strong>must</strong> be met in order to be considered for this contract.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:642px\"><thead><tr><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:186px\"><p><strong>Mandatory Criteria</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:314px\"><p><strong>Description</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:17px; vertical-align:top; width:141px\"><p><strong>Evaluation</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:186px\"><p><strong>Education</strong></p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:314px\"><p>A bachelor&rsquo;s degree in economics, finance, management, business administration, or a related field</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:141px\"><p>Pass or Fail</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:186px\"><p><strong>Experience</strong></p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:314px\"><p>A minimum of seven (7) years of relevant work experience in international development, financial sector, and/or project management, including previous experience working with projects funded by multilateral development banks.</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:17px; vertical-align:top; width:141px\"><p>Pass or Fail</p></td></tr></tbody></table><p><strong>Scoring Criteria &ndash; </strong>These criteria are requirements or qualities that are not mandatory but would be considered beneficial if they are met and will be assigned scores during evaluation.&nbsp; Applicants must detail, in (their) CVs previous positions which support the criteria requirement on experience. Supporting documentation should be provided where necessary.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.75in\"><thead><tr><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:35px; width:61px\"><p><strong>Criteria </strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:35px; width:527px\"><p><strong>Evaluated Criteria</strong></p></td><td style=\"background-color:#deeaf6; border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:1px dotted #4472c4; height:35px; vertical-align:top; width:60px\"><p><strong>Points</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:57px; width:61px\"><p>1</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:527px\"><p>A strong background or experience in the financial/banking sector in either the public or private sector would be desirable;</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:60px\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:57px; width:61px\"><p>2</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:527px\"><p>Demonstrable experience in organizational and administrative duties in liaising with high level stakeholders</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:60px\"><p>30</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:57px; width:61px\"><p>3</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:527px\"><p>Experience working in Pacific Islands Countries or small island developing countries would be an advantage;</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:57px; vertical-align:top; width:60px\"><p>20</p></td></tr><tr><td style=\"border-bottom:1px dotted #4472c4; border-left:1px dotted #4472c4; border-right:1px dotted #4472c4; border-top:none; height:56px; width:61px\"><p>4</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:56px; vertical-align:top; width:527px\"><p>High degree of computer literacy, and intermediate to advanced knowledge of Microsoft Office Package (Excel, Word, and Power Point) and Internet; and</p></td><td style=\"border-bottom:1px dotted #4472c4; border-left:none; border-right:1px dotted #4472c4; border-top:none; height:56px; vertical-align:top; width:60px\"><p>20</p></td></tr></tbody></table><p><strong>Language:</strong> Excellent command of both spoken and written English is required</p><p>&nbsp;</p><p><strong>10. Selection Process</strong></p><p>Selection will follow the Selection of an Individual Consultant, World Bank Procurement Regulations Seventh Edition, September 2025.</p><p>Applicants will be assessed on their Resume as submitted and any supporting documentation.</p><p>Applicants who do not pass <strong>Mandatory criteria</strong> requirements will not be evaluated further.</p><p>Applicants passing mandatory criteria requirements will be assigned points on the presented <strong>scoring criteria</strong>.&nbsp;</p><p>The Evaluation committee reserves the right to interview any candidates.</p><p>A minimum of two professional references should be provided.&nbsp;</p><p>The Project values individuality and celebrates difference with a strong commitment to diversity, equality, racial equity, gender, and disability inclusion and strongly encourages people from culturally and diverse communities to apply for this position.</p><p>&nbsp;</p>"},{"id":"OP00464831","notice_type":"Request for Expression of Interest","noticedate":"26-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-28T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P178237","project_name":"Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience: Federated States","bid_reference_no":"FM-NORMA-539887-CS-CQS","bid_description":"ESTABLISH A FISHERIES DATA COLLECTION AND STORAGE FRAMEWORK FOR COASTAL FISHERIES MANAGEMENT IN FSM","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"National Oceanic Resource Management Authority \nPO Box PS 122\nPohnpei, FM 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"okean.ehmes@norma.fm","contact_name":"Okean Ehmes","contact_organization":"National Oceanic Resource Management Authority","contact_phone_no":"691-320-2700","contact_web_url":"https://norma.fm/","submission_date":"2026-08-26T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>CONSULTING SERVICES - FIRMS SELECTION</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Country</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>Federated States of Micronesia</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Project</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience (PROPER)</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>CONSULTANCY SERVICES TO ESTABLISH A FISHERIES DATA COLLECTION AND STORAGE FRAMEWORK FOR COASTAL FISHERIES MANAGEMENT IN FSM</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Reference No.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>FM-NORMA-539887-CS-CQS</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Publication Date</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>August 26, 2026</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Deadline for EOI Submission</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>September 28, 2026 3:00 PM Pohnpei Local Time</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Selection Method</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>CQS</p></td></tr></tbody></table><p>&nbsp;</p><p>The Federated States of Micronesia has received financing from the World Bank toward the cost of the Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience (PROPER), and intends to apply part of the proceeds for consulting services.</p><p>The consulting services are for the assessment of existing coastal fisheries data systems and gaps and the design of a recommended coastal fisheries data management framework for future implementation. The assignment will cover the four FSM States of Yap, Chuuk, Pohnpei, and Kosrae and is expected to take approximately 12 months.</p><p>The FSM Department of Resources &amp; Development (DRD), in collaboration with State Fisheries Departments, NORMA , now invites eligible consulting firms to indicate their interest in providing the Services.</p><p>1. Objective and Scope of the Assignment</p><p>The objective of the consultancy is to assess existing coastal fisheries data systems and gaps, and to design a recommended data management framework for future implementation. The following areas are not within the scope of the assignment: 1) training, 2) conduct ecological field surveys, 3) build databases, 4) validate protocols, or and 5) produce management recommendations. These activities are intended to be undertaken under subsequent consultancies.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Stage</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Main Activity</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Expected Output / Focus</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Desk Review and Data Inventory</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Existing literature, research reports, available databases, catch and effort, landings, market, ecological data, and metadata catalogue.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Stakeholder Engagement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Fact-finding and prioritization with State fisheries departments, research institutions, and communities; information disaggregated by gender, age group, and fishing role where feasible.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data Quality and Gap Assessment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Gap analysis and scoring matrix covering completeness, accuracy, timeliness, consistency, accessibility, and dataset quality tiers.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Institutional Assessment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Review of data-related capacity, systems, workflows, reporting, responsibilities, and data-sharing mechanisms.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Recommended Data Collection Protocols</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Recommended SOPs for catch, effort, market, and biological data collection aligned with SPC, WCPFC, and FAO ASFIS references.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>6</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data Storage, Access, and Governance Framework</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Recommended database architecture, hosting, backup, user permissions, ownership, interoperability, sustainability, and accessibility arrangements.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>7</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>State-Specific Ecological Assessment TORs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Four separate procurement-ready TORs for Yap, Chuuk, Pohnpei, and Kosrae, based on data assessment outcomes.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>8</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Ecological Assessment Data Needs Prioritization</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Prioritized sequence of future State ecological data collection assessments, including maps and GIS coordinates of priority sites.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>9</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data Management Implementation Roadmap</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Phased implementation roadmap with estimated costs, sequencing, and dependencies.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>10</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Other Subsequent Consultancy TORs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Procurement-ready TORs for data training and mentoring, protocol validation, database build-out/deployment, and data entry mobile applications.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>11</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Final Report and Presentation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Final consultancy report, handover package, and presentation of findings.</p></td></tr></tbody></table><p>2. Key Deliverables and Timing</p><p>The Consulting Firm will be required to submit the following deliverables. Timing is indicative and measured in weeks after contract signing, unless otherwise stated.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>No.</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:564px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:72px\"><p><strong>Timing</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Inception Report, including risk mitigation plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Stakeholder Engagement Summary</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 14</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Compiled Data Repository and Metadata Catalogue</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 18</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Data Quality and Gap Assessment Report, including scoring matrix</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 22</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Institutional Assessment Report - data-related capacity only, no training delivery</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 26</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Recommended Data Collection Protocols Document - design only</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 32</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Recommended Data Storage, Access, and Governance Framework</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 36</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Ecological Assessment Data Needs Prioritization by State, with maps/GIS, based on SAR 2023 and data assessment outcomes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 38</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Yap Ecological Data Collection TOR, based on data assessment outcomes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 42</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Chuuk Ecological Data Collection TOR, based on data assessment outcomes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 42</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>11</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Pohnpei Ecological Data Collection TOR, based on data assessment outcomes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 42</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Kosrae Ecological Data Collection TOR, based on data assessment outcomes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 42</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>13</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Data Management Implementation Roadmap</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 44</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>14</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Procurement-ready TORs for other subsequent consultancies: data training, database, mobile app, and protocol validation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 44</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Final Consultancy Report, including handover package</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 46</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>16</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Presentation of Findings</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Week 46</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>17</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:564px\"><p>Monthly Progress Reports</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>Monthly</p></td></tr></tbody></table><p>3. Required Firm Experience and Shortlisting Criteria</p><p>Interested consulting firms should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Expressions of Interest should focus on firm-level qualifications and relevant experience. Key Experts will not be evaluated at this shortlisting stage.</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Criterion</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Indicative considerations</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Suggested evidence</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Relevant fisheries data management experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience assessing and designing fisheries data systems, metadata catalogues, data quality frameworks, data gap assessments, and data governance arrangements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Project descriptions, client references, outputs, dates, countries, and contract values.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Coastal fisheries and Pacific/small island context</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience in coastal fisheries, community fisheries, ecological information needs, and Pacific Island or small island developing state contexts. FSM experience is preferred.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Examples of comparable assignments in Pacific Island countries or similar contexts.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Institutional and capacity assessment experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience reviewing institutional workflows, data-sharing mechanisms, reporting responsibilities, and data-related capacity needs for public agencies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Institutional assessment reports or project summaries.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data standards and interoperability</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience applying fisheries data standards, metadata, QA/QC, and relevant standards or references such as SPC coastal fisheries minimum datasets, WCPFC standards, FAO ASFIS codes, and other recognized ecological data methods.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Examples of standards-based data frameworks, metadata catalogues, or SOPs.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>GIS and spatial prioritization</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience in spatial data inventory, mapping, GIS prioritization, and preparation of maps and coordinates for ecological assessment planning.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>GIS outputs, mapping work samples, and project references.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>TOR and implementation roadmap preparation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience preparing procurement-ready TORs, implementation roadmaps, costed action plans, and phased system implementation recommendations.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Examples of TORs, roadmaps, or investment plans.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Stakeholder engagement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience consulting with government agencies, communities, research institutions, and fisheries stakeholders, including gender- and role-sensitive data collection where feasible.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Stakeholder engagement summaries and references.</p></td></tr></tbody></table><p>4. Indicative Key Personnel</p><p>The firm should demonstrate that it can mobilize a qualified team. The TOR identifies the following indicative key personnel:</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Key Personnel / Expertise</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Description</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Team Leader / Fisheries Data Management Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Senior fisheries professional with expertise in data systems assessment and Pacific Island fisheries context. Minimum 10 years of experience. FSM or small islands experience preferred.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data Management Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience in data standards, metadata, gap analysis, QA/QC assessment, data-related capacity assessments, and institutional reviews of data systems. Minimum 10 years of experience. FSM or small islands experience preferred.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>GIS and Spatial Data Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Experience in spatial data inventory, gap analysis, and prioritization mapping. Minimum 5 years of experience. FSM or small islands experience preferred.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>National Liaison Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Knowledge of FSM institutions, fisheries sector, and stakeholder engagement. Minimum 5 years of experience.</p></td></tr></tbody></table><p><em>Note: Detailed CVs are NOT required at this Stage. However, Firms may provide a brief staffing approach or indicate availability of the required expertise..</em></p><p>5. Selection Process, Associations, and Conflict of Interest</p><p>A consulting firm will be selected in accordance with the Consultant&rsquo;s Qualification-based Selection (CQS) &nbsp;procedures set out in the&nbsp; World Bank Procurement Regulations for IPF Borrowers, Seventh Edition, September 2025.</p><p>Consulting firms may associate with other firms to enhance their qualifications, but should clearly indicate whether the association is in the form of a joint venture and/or sub-consultancy. In the case of a joint venture, all members of the joint venture shall be jointly and severally liable for the entire assignment if selected.</p><p>Interested firms should provide information on any actual or potential conflict of interest arising from other assignments or conflicting involvement in related assignments.</p><p>The attention of interested Consultants is drawn to the applicable provisions of the World Bank Procurement Regulations on conflict of interest, eligibility, and fraud and corruption.</p><p>6. Submission Requirements</p><p>The Expression of Interest should include the following information, preferably not exceeding 15 pages excluding annexes]:</p><ul><li>Firm profile, legal status, country of registration, and contact details;</li><li>Description of the firm&rsquo;s core business and years in business;</li><li>Summary of no more than five relevant assignments completed during the last 5 years, including client, country, contract value, duration, and firm role;</li><li>Evidence of experience in fisheries data management, coastal fisheries, metadata catalogues, data gap assessments, data governance, GIS mapping, and institutional assessment;</li><li>Brief statement on experience in FSM, Pacific Island countries, or small island developing states;</li><li>Description of any proposed association, joint venture, or sub-consultancy arrangement;</li><li>Statement confirming availability and ability to mobilize for a 12-month assignment involving travel to all four FSM States;</li><li>Conflict of interest declaration.</li></ul><p>7. Submission Address and Deadline</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:42%\"><p><strong>Submission deadline</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:57%\"><p>September 28, 2026, 3:00 PM Pohnpei Local Time</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42%\"><p><strong>Submission method</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:57%\"><p>E-mail</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42%\"><p><strong>Address / email</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:57%\"><p>proper.procurement@norma.fm</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42%\"><p><strong>Contact person</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:57%\"><p>Okean Ehmes, Project Manager</p></td></tr><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42%\"><p><strong>Clarification deadline</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:57%\"><p>September 17,2026</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Expressions of Interest must be delivered in written form to the address above by the stated deadline. Late submissions may be rejected in accordance with the applicable procurement procedures.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX A - Suggested EOI Submission Forms</strong></p><p>Form 1. Firm Information</p><p>Provide the firm name, country of registration, address, authorized representative, contact details, legal status, and years in business.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Field</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Response</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr></tbody></table><p>Form 2. Relevant Assignment Experience</p><p>Provide details for each relevant assignment: client, country, contract title, contract value, dates, role of the firm, partners, description of services, outputs, and contact reference.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Field</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Response</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr></tbody></table><p>Form 3. Summary of Relevant Technical Experience</p><p>Summarize experience in fisheries data systems, metadata catalogues, data quality and gap assessments, institutional assessments, GIS/spatial prioritization, data governance, and Pacific/small island fisheries.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Field</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Response</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr></tbody></table><p>Form 4. Association / Joint Venture / Sub-consultancy Statement</p><p>State whether the firm is expressing interest alone, as a joint venture, or with sub-consultants. Identify each partner and its proposed role.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Field</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Response</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr></tbody></table><p>Form 5. Conflict of Interest Declaration</p><p>Disclose any actual or potential conflict of interest, including prior or current assignments that may affect the firm&rsquo;s ability to perform the assignment impartially.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Field</strong></p></td><td style=\"background-color:#d9eaf7; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:336px\"><p><strong>Response</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>APPENDIX B - Optional Internal Shortlisting Worksheet</strong></p><p>This worksheet is for Client internal use only and should be tailored to the approved procurement approach. It should not be included in the published REOI unless intended.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Shortlisting Area</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Suggested Weight</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Evidence to Review</strong></p></td><td style=\"background-color:#1f4e79; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Evaluator Notes</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Fisheries data management and data systems assessment experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>25%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Comparable assignments and outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Coastal fisheries and Pacific/small island context</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Relevant country and sector experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Data quality, metadata, standards, QA/QC, and interoperability</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>20%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Standards-based work, metadata, QA/QC frameworks</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Institutional/data governance assessment experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Institutional reviews and governance frameworks</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>GIS/spatial prioritization and ecological assessment planning</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Mapping and spatial planning outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Quality of EOI, relevance, and clarity of proposed association</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>Completeness and clarity</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX C - Summary Terms of Reference for Publication</strong></p><p>FSM currently lacks nationally standardized approaches for fisheries data collection, storage, access, and governance. Prior to implementation investments, FSM requires an assessment of existing datasets, information systems, institutional arrangements, and data/ecological information gaps. The FSM Coastal Fisheries SAR 2023 is the foundational reference for identifying priority data and ecological assessment needs across Yap, Chuuk, Pohnpei, and Kosrae.</p><p>The assignment will produce a data inventory and metadata catalogue, data quality and gap assessment with scoring matrix, institutional capacity assessment focused on data-related capacity, recommended standardized data collection protocols, recommended data storage/access/governance framework, ecological assessment data needs prioritization, four State-specific ecological data collection TORs, a phased data management implementation roadmap, and procurement-ready TORs for subsequent implementation consultancies.</p><p>The assignment is assessment and design focused. It excludes implementation training, ecological field surveys, database build-out, protocol validation, mobile application rollout, and management recommendations</p>"},{"id":"OP00464731","notice_type":"Request for Expression of Interest","noticedate":"25-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-07T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"St Maarten","project_id":"P179067","project_name":"SINT MAARTEN: WASTEWATER MANAGEMENT PROJECT","bid_reference_no":"SX-NRPB-569596-CS-INDV","bid_description":"Hydraulic Engineer","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Walter Nisbeth Road 57\nPhilipsburg, St, Maarten","contact_ctry_name":"St Maarten","contact_email":"jobopportunity@nrpbsxm.org","contact_name":"Alvaro Vadillo","contact_organization":"National Recovery Program Bureau","contact_phone_no":"+17215428887","contact_web_url":"https://nrpbsxm.org/","submission_date":"2026-08-25T00:00:00Z","notice_text":"<p>National Recovery Program Bureau</p><p>TERMS OF REFERENCE</p><p>For</p><p>Individual Consultant (20 months)</p><p>-Time based-</p><p>HYDRAULIC ENGINEER</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Following the devastation caused by hurricanes Irma and Maria in September 2017, the Government of Sint Maarten embarked on a large-scale recovery and reconstruction program, based on the principle of building back better.</p><p>Since January 2018, the World Bank is assisting the Government of Sint Maarten. A significant part of Sint Maarten&rsquo;s ongoing recovery and reconstruction program is financed through a Trust Fund financed by the Netherlands, managed by the World Bank, and implemented by Sint Maarten.</p><p>To support the implementation of the Trust Fund, the Government of Sint Maarten established the National Recovery Program Bureau (NRPB), which serves as the Project Implementation Unit (PIU) for the Government of Sint Maarten.</p><p><strong>Short Description of the Project</strong></p><p>The Wastewater Management Project (hereinafter referred to as &ldquo;the Project&rdquo;) implements a wide range of activities, in close collaboration with government counterparts and ministries, notably Ministry of Public Housing, Spatial Planning, Environment, and Infrastructure (hereinafter referred to as &ldquo;VROMI&rdquo;.</p><p>The project consists of the improvement of the coverage and performance of the wastewater system in Sint Maarten. This will be done through the expansion of the existing sewerage network to enable the connection for residents and commercial enterprises, the rehabilitation of critical parts of the existing sewage system to improve its climate resilience and operational efficiency and the improvement of the wastewater treatment plant.</p><p><strong>Role of the Engineer</strong></p><p>NRPB is seeking the services of an Engineer [hereinafter referred to as &ldquo;Consultant&rdquo;] to support the NRPB with technical expertise on all construction-related activities under the Wastewater Management Project and any other project that could utilize the specific expertise of the Engineer. The Engineer will assist the NRPB in the development of terms of references, technical drawings, bills of quantities, cost estimates, bidding documents etc. (S)he will monitor works on behalf of the project Manager (PM) and represent the NRPB in technical committee meetings and evaluations upon</p><p>SWAMP PM request. The Engineer shall report regularly on the progress of project implementation to the NRPB.</p><p><strong>Key Duties and Responsibilities</strong></p><p>The Engineer will be a full-time professional responsible for technical aspects of project execution and supervision and will support the NRPB with all matters concerning construction under the Project. Construction activities under the project include the installation of sewerage pipes, construction of manholes, connections to buildings and upgrade works in the wastewater treatment plant.</p><p>The Engineer&rsquo;s responsibilities will include:</p><p>1. Work within the NRPB on the implementation of the Project following the rules and regulations of the World Bank.</p><p>2. In coordination with NRPB Procurement, as well as line ministries/external agencies, manage and supervise the preparation of all required technical project documents including Terms of Reference (ToRs) for consultants and consulting firms, specifications, and designs for works.</p><p>3. Cooperate and coordinate with operational units of line ministries/agencies to develop technical terms of references, scope of works, bills of quantities and cost estimates.</p><p>4. Assist NRPB Procurement in the preparation of technical tender documents.</p><p>5. Identify all technical elements and documentation required to implement assigned project activities.</p><p>6. Represent the NRPB as the contracting officer&rsquo;s technical representative (COTR) during project execution and serve as the principal contact with consultants and contractors during project execution.</p><p>7. Represent the NRPB in technical bid evaluations during the contracting process.</p><p>8. Track activities&rsquo; progress, specifically to ensure timely conclusion of works.</p><p>9. Regularly monitor and report on project execution progress and budget performance.</p><p>10. Regularly liaise with the Project Manager, NRPB Procurement Officers, E&amp;S Officers, Legal Officers, and M&amp;E Specialist to ensure achievement of the program objectives, as well as ensure compliance with World Bank procedures.</p><p>11. Work directly with project counterparts and relevant stakeholders to ensure deliverables fall within the applicable scope and budget. This will involve coordinating with other departments within the Government as well as external counterparts, to ensure all aspects of each construction activity are compatible and to clarify specific requirements of each project.</p><p>12. Report periodically to the Project Manager on progress and challenges of ongoing construction activities.</p><p>13. Make suggestions that may improve his/her own job description or implementation, the overall implementation of SWaMP or the functioning of the NRPB.</p><p>14. Assist with any other project that could utilize the specific expertise of the Engineer.</p><p>15. Conduct any other ad hoc technical or contract management work as directed by the Project Managers.</p><p><strong>Contractual Arrangements.</strong></p><p>A time-based contract is expected to be signed. The start date of the contract will be October 2026 or soon thereafter. The contract&rsquo;s duration will be 20 months, until 30 June 2028. The successful candidate is expected to be based within Philipsburg, Sint Maarten. The Consultant is expected to perform the above-mentioned tasks on an ongoing basis during the term of his/her assignment, to the satisfaction of the Project Manager.</p><p>The consultant will report monthly to the Project Manager</p><p>The performance of the Consultant will be appraised by the Project Manager based on the timely implementation and execution of tasks described under the key responsibilities for the role.</p><p><strong>Qualification requirements</strong></p><p>Minimum Requirements</p><p>&middot; Master&rsquo;s degree in civil engineering, water or wastewater Engineering;</p><p>- With a Master&rsquo;s Degree: A minimum of 5 years of professional experience in the field of technical design, construction management and site supervision</p><p>Or: Bachelor&rsquo;s Degree in Civil Engineering, water or wastewater Engineering;</p><p>- With a Bachelor&rsquo;s Degree: A minimum of 7 years of professional experience in the field of technical design, construction management and site supervision;</p><p>&middot; Functionally computer literate, possessing operational skills in word-processing and spreadsheet software such as MS Word, MS Excel, MS PowerPoint and project management software such as MS Project;</p><p>&middot; Proven relevant experience in preparation of technical documentation, Terms of references, technical bidding documents and specifications.</p><p>&middot; Proven relevant experience of wastewater installations management and site supervision;</p><p>&middot; Proven relevant experience in managing external consultants and contractors;</p><p>&middot; Proven experience with the preparation of technical briefings and reports.</p><p>&middot; Fluency in English;</p><p>&middot; Ability to work with and coordinate other professionals in engineering activities;</p><p>&middot; Demonstrated ability to work in teams within a collaborative mode; develop and maintain effective work relationships with counterparts;</p><p>&middot; Ability to manage priorities and workflow within deadlines and work efficiently under pressure;</p><p>&middot; Time management and organizational skills with attention to detail;</p><p><strong>Preferred Experience</strong></p><p>&nbsp;</p><p>&middot; Experience in multidisciplinary, donor-funded projects.</p><p>&middot; Familiarity with World Bank procedures would be a significant advantage.</p><p>&middot; Proficiency in Dutch in speech and writing is an advantage.</p><p>&middot; Understanding the challenges faced by (Caribbean), Small Island Developing States (SIDS);</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Strategic Competencies &ndash; brief description</strong></p><p>&nbsp;</p><p>NRPB as an organization is committed not only to WHAT we must achieve but also on HOW we are going to reach our objectives. Therefore, for this position we are looking for a profile that displays the following competencies:</p><p>Professional Acumen - Intermediate Level</p><p>&middot; Applies problem-solving methodologies and tools to diagnose and solve operational and interpersonal problems;</p><p>&middot; Determines the potential causes of the problem and works on certain scenarios;</p><p>&middot; Sees opportunities and takes the initiative to act on them;</p><p>&middot; Understands that responsible use of resources maximizes our impact on our beneficiaries;</p><p>&middot; Open to change and flexible in a fast-paced environment;</p><p>&middot; Effectively adapts own approach to suit changing circumstances or requirements;</p><p>&middot; Evaluates data and courses of action to reach logical, pragmatic decisions;</p><p>&middot; Takes an unbiased, rational approach with calculated risks;</p><p>Looking at the bigger picture &ndash; Strategic outlook &ndash; Beginner Level</p><p>&middot; Aligns current work and activities with the NRPB&rsquo;s strategic goals;</p><p>&middot; Acts on and implements strategies and policies in accordance with the NRPB&rsquo;s strategic goals;</p><p>&middot; Comprehends operational and organizational goals and direction;</p><p><strong>Leading myself and the others &ndash; Intermediate Level</strong></p><p>&middot; Regularly provides constructive feedback and recognition to team members regarding job performance;</p><p>&middot; Collaborates and supports the development of others;</p><p>&middot; Shares own knowledge and best practices with others for the purpose of assisting in their ongoing development;</p><p><strong>Respect for diversity - Intermediate level</strong></p><p>&middot; Treats all individuals with respect;</p><p>&middot; Responds sensitively to differences and encourages others to do the same;</p><p>&middot; Shows flexibility in changing the styles when faced with multiple dimensions of culture to be effective across cultural contexts;</p><p>&middot; Understands multiple cultural frameworks, values, and norms;</p><p><strong>Successful Communication &ndash; Intermediate level</strong></p><p>&middot; Explains issues clearly and succinctly;</p><p>&middot; Writes clearly and succinctly in standard communication settings and styles;</p><p>&middot; Can clearly identify the subject and state the purpose of the communication;</p><p>&middot; Communicates with impact as well as with empathy;</p><p>&middot; Remains calm when dealing with conflicts; shows empathy;</p><p><strong>Relationship Building. Consultation and Collaboration &ndash; Intermediate level</strong></p><p>&middot; Shares information and readily determines to whom to go for relevant information;</p><p>&middot; Seeks assistance and feedback in the problem-solving process;</p><p>&middot; Fosters teamwork;</p><p>&middot; Initiate collaboration on projects or methods of operating;</p><p>&middot; Demonstrates understanding of the impact of own role on all partners and always puts the end beneficiary first;</p><p><strong>Courage and Integrity &ndash;Intermediate level</strong></p><p>&middot; Maintains general knowledge of ethics, laws, regulations, standards that may impact the organization</p><p>&middot; Reinforces difficult decisions that align with the organizational strategies and goals</p><p>&middot; Enforces policies consistently</p><p>&middot; Influences others to behave in an ethical manner</p><p>&middot; Takes immediate action regarding reports of unethical behaviors or conflict of interest</p><p><strong>How to Apply?</strong></p><p>&nbsp;</p><p>Interested consultants can send their CV in English by e-mail ONLY to<strong> jobopportunity@nrpbsxm.org.</strong></p><p></p><p>In the subject line, please state, &ldquo;Hydraulic Engineer &rdquo;. The CV should clearly present relevant experience to meet minimum requirements and preferred requirements, as outlined in this terms of reference.</p><p></p><p>Applicants should ensure that their CV is received before __________2026, at 17h00 AST. Any CVs received after this deadline may not be considered.</p><p></p><p>When applying, please consider the following requirements:</p><p></p><p>&middot; Upon selection for an interview, applicants will be requested to produce evidence of the educational and professional qualifications pertaining to the minimum requirements. References may be asked for.</p><p>&middot; Applicants may also be subject to satisfactory background checks.</p>"},{"id":"OP00464182","notice_type":"Request for Expression of Interest","noticedate":"22-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-22T00:00:00Z","submission_deadline_time":"04:00","project_ctry_name":"Western and Central Africa","project_id":"P178497","project_name":"Harmonizing and Improving Statistics in West and Central Africa - Series of Projects 1 (HISWACA - SO","bid_reference_no":"GM-GBOS - GAMBIA-561886-CS-INDV","bid_description":"Recruitment of a consultant for Technical Assistance for Poverty Measurement, Poverty Analysis, and Capacity Building\nThe Gambia Integrated Household Survey (GIHS) 2025/26","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Kanifing Institutional Layout, Serrekunda, Bakau New Town, Serrekunda, Gambie","contact_ctry_name":"Gambia, The","contact_email":"jannehuo97@gmail.com","contact_name":"Mohammed L Janneh","contact_organization":"Gambia Bureau of Statistics","contact_phone_no":"(00220)3998803","submission_date":"2026-08-22T00:00:00Z","notice_text":"<p>&nbsp;</p><p>Harmonizing and Improving Statistics in West and Central Africa <strong>(</strong>HISWACA)</p><p>Project Implementation Unit (PIU), C/o Gambia Bureau of Statistics,</p><p>Kanifing Institutional Layout, Kanifing, The Gambia</p><p>&nbsp;</p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><p>Country<strong>: The Gambia</strong></p><p>Project:<strong> </strong>Harmonizing and Improving Statistics in West and Central Africa</p><p>Grant No.: <strong>&nbsp;IDA E1750-GM</strong></p><p>Assignment Title<strong>: </strong>Consultancy for Poverty Measurement, Poverty Analysis, and Capacity Building the Gambia Integrated Household Survey (GIHS) 2025/26.</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; TERMS OF REFERENCE</p><ol><li>Background and Context</li></ol><p>The Gambia Bureau of Statistics (GBoS) is responsible for the production and dissemination of official statistics to support evidence-based planning, policy formulation, monitoring, evaluation, and reporting on national development priorities. As part of its mandate, GBoS is implementing the Gambia Integrated Household Survey (GIHS) 2025/26, a nationally representative household survey designed to collect comprehensive data on household welfare, consumption, labour market outcomes, demographic characteristics, and other socio-economic indicators. The GIHS 2025/26 will provide the basis for producing updated poverty and inequality estimates for The Gambia.</p><p>The Harmonizing and Improving Statistics in West and Central Africa (HISWACA) Project is a World Bank-supported regional initiative aimed at strengthening the capacity, harmonization, quality, production, and use of statistics across participating countries in West and Central Africa. In The Gambia, the HISWACA Project provides grant financing to support the strengthening of the national statistical system, including improvements in statistical production, data quality, institutional capacity, analytical capability, and dissemination of official statistics.</p><p>Through funding from the HISWACA Project, GBoS seeks to strengthen its institutional and technical capacity in poverty measurement, welfare analysis, and the use of household survey data for policy-relevant statistical outputs. In this regard, GBoS intends to engage a Technical Assistant to support the processing and analysis of GIHS 2025/26 data, construction of welfare aggregates, review or updating of the national poverty line, production of poverty and inequality estimates, preparation of methodological documentation, and capacity building of GBoS technical staff. This support is expected to enhance the quality, transparency, replicability, and institutional sustainability of poverty statistics production in The Gambia.</p><p>The assignment will be implemented in a phased manner, beginning with data quality assessment, data cleaning, and diagnostic review, followed by welfare aggregate construction, poverty line updating, poverty estimation, robustness checks, training, methodological documentation, and reporting. The technical work will depend on the timely availability of household survey datasets, price survey datasets, final household weights, previous poverty documentation, and other supporting materials to be provided by GBoS.</p><p>The resulting poverty and inequality estimates will be critical for informing national development planning, monitoring progress towards the Sustainable Development Goals, assessing welfare trends, and supporting the design and evaluation of social and economic policies in The Gambia.</p><ol><li>Objectives of the Assignment</li></ol><p>The overall objective of the assignment is to support GBoS in producing reliable poverty and inequality estimates from the GIHS 2025/26 and to strengthen the technical capacity of GBoS staff in poverty measurement.</p><p>The specific objectives are to:</p><ol><li>Support the cleaning, validation, and preparation of GIHS 2025/26 datasets required for poverty analysis, including review of key welfare measurement variables, data quality issues, missing values, skip patterns, and outliers.</li><li>Construct a national welfare aggregate for poverty measurement, including nominal consumption aggregation, treatment of outliers, price adjustments, spatial and temporal deflators, and other methodological procedures required to produce a real consumption aggregate.</li><li>Review and update the national poverty line using an approach to be agreed with GBoS, which may include updating the existing poverty line using price indices or constructing a new poverty line based on current survey data.</li><li>Produce national, urban/rural, and regional poverty estimates, applying final household weights once provided by GBoS, and undertake sensitivity checks to assess the robustness of the results.</li><li>Build the capacity of GBoS technical staff in poverty measurement methodology, including welfare aggregate construction, poverty line methodology, poverty estimation, interpretation of results, and use of STATA for poverty analysis.</li><li>Prepare comprehensive analytical and methodological outputs, including documented syntax files, poverty results, methodological documentation, and reports required for technical review, institutional learning, and future replication.</li></ol><ol><li>Scope of work and key tasks</li></ol><p>The Technical Assistant will undertake the following tasks.</p><ol><li>Data cleaning, quality assessment, and diagnostic review</li></ol><p>A1. Required inputs from GBoS</p><p>Before work under this phase can commence, GBoS will provide the consultant with the datasets for Quarter 1and Quarter 2, the Quarter 3 dataset if available at the time of initiation, and the corresponding price survey datasets.</p><p>A2. Data quality flagging</p><p>The consultant will conduct review of the household survey and price survey datasets to identify potential quality issues in variables critical to welfare measurement. This activity is expected to produce a structured set of flags to support early diagnosis and technical discussions before the finalization of data collection and comprehensive data cleaning.</p><p>The flagging exercise will cover two complementary dimensions. First, it will assess key variables used for poverty measurement and consumption aggregate construction, including missing values and data quality concerns. Second, it will examine missing values and non-response by the respondents, and LGA, in order to identify systematic patterns in data quality.</p><p><strong>Indicative duration:</strong> 7 working days.</p><p>A3. Comprehensive data cleaning</p><p>The consultant will clean and prepare all relevant questionnaire sections required for poverty measurement analysis and public dissemination. The workplan specifies that this will cover all sections of the questionnaire and will include standardizing formats and display conventions, verifying internal skip logic and routing rules, checking consistency of responses across related sections, and identifying and addressing out-of-range values.</p><p>The consultant may draft do-files for this activity before the end of data collection; however, these do-files must be reviewed and finalized once data collection is complete.</p><p><strong>Indicative duration:</strong> 22 working days, subject to preliminary review of the datasets shared by GBoS.</p><p>A4. Technical discussions and feedback sessions with GBoS</p><p>Building on the data quality flagging exercise and preliminary observations from the data cleaning process, the consultant will hold technical discussions with GBoS to jointly review flagged issues and agree on how to address missing data and data quality concerns before the comprehensive data cleaning phase is finalized.</p><p>These technical discussions will also provide an opportunity to identify any potential challenges from a sampling perspective, ensuring that gaps or anomalies in coverage are considered in the calculation and application of survey weights.</p><p>A5. Outlier detection and treatment</p><p>The consultant will detect and treat outliers in variables used for construction of the consumption aggregate. The treatment approach will be determined based on the nature and scale of identified issues. Where major outliers cannot be resolved through standard analytical methods, the consultant will engage with GBoS to clarify or address the underlying data issues.</p><p>The consultant may draft do-files for outlier detection and treatment before the end of data collection; however, these must be reviewed and finalized once data collection is complete.</p><p><strong>Indicative duration:</strong> 5 working days.</p><ol><li>Poverty measurement and welfare aggregate construction</li></ol><p>B1. Required inputs from GBoS</p><p>Before work under this phase can commence, GBoS will provide complete and final GIHS 2025/26 datasets for all quarters and the final price survey dataset. These datasets are required before any sub-activity under poverty measurement can begin, as they underpin the construction of the consumption aggregate, poverty line update, and final poverty estimates.</p><p>B2. Construction of the consumption aggregate</p><p>The consultant will construct the nominal consumption aggregate and adjust it for price variation using spatial and temporal deflators. The output will be a real consumption aggregate that can be compared against the poverty line to produce poverty estimates.</p><p>This work will include, but not necessarily be limited to:</p><ul><li>Review of consumption-related questionnaire sections;</li><li>Harmonization and cleaning of consumption variables;</li><li>Treatment of missing values and outliers;</li><li>Construction of food and non-food consumption components;</li><li>Application of spatial and temporal price adjustments;</li><li>Construction of the nominal and real welfare aggregates;</li><li>Documentation of assumptions, decisions, and methodological choices; and</li><li>Preparation of documented and replicable STATA syntax.</li></ul><p><strong>Indicative duration:</strong> 20 working days.</p><p>B3. Poverty line update</p><p>The consultant will support the review and updating of the national poverty line. The approach will be agreed with GBoS and may follow one of two scenarios: updating the existing 2020 poverty line by adjusting it for inflation using a price index or constructing a new poverty line from scratch using current survey data, including re-estimation of food and non-food components and additional methodological and robustness analysis.</p><p>The consultant will document the agreed methodology, data sources, assumptions, price adjustments, and robustness checks used in updating or constructing the poverty line. This activity may be drafted before the end of data collection but must be reviewed and finalized once data cleaning is complete.</p><p><strong>Indicative duration:</strong> 15 working days.</p><p>B4. Poverty estimates and robustness checks</p><p>Once the consumption aggregate has been constructed and the poverty line has been updated, the consultant will produce poverty estimates at the national level, by urban/rural, and by LGA.</p><p>This activity is contingent on the availability of final sampling weights to be provided by GBoS. The work on final poverty estimates will commence once the final weights have been shared. The consultant will conduct sensitivity checks to verify the robustness of the results and will document the findings for technical review and institutional learning.</p><p><strong>Indicative duration:</strong> 5 working days.</p><p>B5. Treatment of sampling weights</p><p>The preparation and finalization of sampling weights will remain the responsibility of the sampling consultant or the designated GBoS sampling team. The poverty measurement consultant will apply the finalized weights in the production of poverty and inequality estimates and will document how the weights were applied in the analysis.&nbsp;</p><ol><li>Capacity building and knowledge transfer</li></ol><p>C1. Training preparation</p><p>The consultant will prepare training materials based on the outputs of the consumption aggregate construction and poverty line update. This activity includes the development of presentation slides covering theoretical content and do-files illustrating the poverty measurement methodology.</p><p>Training preparation may begin before the end of data collection, provided that the first draft of the consumption aggregate and poverty line is available.</p><p><strong>Indicative duration:</strong> 5 working days.</p><p>C2. In-person training on poverty measurement</p><p>The consultant will deliver in-person training to selected GBoS technical staff on poverty measurement methodology. The training will cover the theory of welfare measurement, construction of the consumption aggregate, and construction or updating of the poverty line.</p><p>The sessions are to be structured with theoretical content in the morning and hands-on practical exercises in the afternoon, following the same thematic sequence</p><p>The training will also serve as a technical review platform for discussing methodological choices made during the construction of the consumption aggregate and poverty line. This will include discussion of approaches used, reasoning behind key decisions, interpretation of results, and possible refinements emerging from GBoS feedback.</p><p>The training will be scheduled only after the consultant has had sufficient time to review, clean, and substantially advance the poverty measurement work. This reflects the comments that five days between data sharing and training is insufficient and that poverty-related analytical work should be substantially advanced before training delivery.</p><p><strong>Indicative duration:</strong> 10 working days for poverty measurement methodology only.</p><p>C3. Mentoring and knowledge transfer</p><p>The consultant will provide structured mentoring to GBoS staff before, during, and after the training. Pre-training support will focus on data familiarization and preparation; support during the training will focus on practical application of poverty measurement methods; and post-training mentoring will support GBoS staff in reviewing outputs, interpreting estimates, consolidating skills, and ensuring replicability of the analysis.</p><p>&nbsp;</p><ol><li>Analytical outputs and reporting</li></ol><p>D1. Poverty report</p><p>The consultant will prepare a poverty report presenting the results of the poverty measurement exercise. This activity can only begin once poverty estimates are in their final version. GBoS will provide the previous poverty report and all do-files and documentation, including Excel files, supporting the previous report before this activity begins.</p><p>The scope and final structure of the poverty report will be agreed with GBoS. The report should present key poverty results, interpretation of findings, disaggregated estimates, robustness checks, and comparison with previous survey rounds where appropriate and technically feasible.</p><p><strong>Indicative duration:</strong> 10 working days, subject to clarification of the report content and scope.</p><p>D2. Methodological report</p><p>The consultant will prepare a comprehensive methodological report documenting the poverty measurement methodology. The methodological report should fully document the construction of the welfare aggregate, treatment of outliers, price adjustments, poverty line methodology, sampling weights, sensitivity checks, robustness analysis, and all key methodological choices and assumptions.</p><p><strong>Indicative duration:</strong> 20 working days.</p><p>D3. Socioeconomic report</p><p>The consultant will support preparation of a socioeconomic report. This activity depends on GBoS providing the socioeconomic report template and any do-files or code used in previous rounds to compute the required indicators.</p><p>The duration of this activity remains to be determined, pending clarification of the report content and scope, availability of existing do-files, and availability of a template to guide estimation of workload.</p><ol><li>Expected deliverables</li></ol><p>The consultant will submit the following deliverables.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:642px\"><tbody><tr><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:36px\"><p>No.</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:138px\"><p>Deliverable</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:324px\"><p>Description</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:144px\"><p>Timeline / level of effort</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Inception report and detailed workplan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Detailed methodology, implementation schedule, data requirements, training approach, reporting arrangements, and deliverable schedule.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>Within 10 working days of contract effectiveness</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Data quality flagging report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Structured diagnostic report identifying missing values, non-response, and quality issues in variables critical to welfare measurement, including patterns by enumerator, team, and region.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>7 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Cleaned GIHS datasets and cleaning syntax</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Cleaned datasets covering relevant questionnaire sections, with do-files for standardization, skip logic checks, consistency checks, and out-of-range values.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>22 working days, subject to preliminary dataset review</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Technical discussion notes</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Notes summarizing flagged issues, agreed resolutions, sampling-related concerns, and follow-up actions from technical discussions with GBoS.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>Following data quality review</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Outlier detection and treatment note</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Documentation of outlier detection and treatment for variables used in consumption aggregate construction.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>5 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Consumption aggregate files and documentation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Nominal and real consumption aggregates, spatial and temporal deflators, supporting syntax, and documentation of methodological decisions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>20 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Poverty line update note</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Documentation of the agreed poverty line update approach, including whether the 2020 poverty line is updated using price indices or a new poverty line is constructed from current survey data.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>15 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Poverty estimates and robustness checks</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>National, urban/rural, and LGA poverty estimates, applying final household weights, with sensitivity and robustness checks.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>5 working days after final weights are provided</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Training materials</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Presentations, exercises, reference notes, practical examples, and STATA do-files based on the consumption aggregate and poverty line work.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>5 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>In-person training delivery</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Ten-day hands-on training on poverty measurement methodology, including welfare measurement, consumption aggregate construction, poverty line methodology, and practical exercises.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>10 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>11</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Training completion report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Summary of training delivered, topics covered, participants trained, key discussions, feedback, capacity gaps, and recommendations for continued learning.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>Within 10 working days after training</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Poverty report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Report presenting final poverty results, interpretation, disaggregated estimates, robustness checks, and comparison with previous rounds where appropriate.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>10 working days, subject to agreed scope</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>13</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Methodological report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Full technical documentation of welfare aggregate construction, outlier treatment, price adjustment, poverty line methodology, sampling weights, robustness checks, and results.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>20 working days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>14</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Complete replicable STATA syntax</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Fully documented and replicable STATA syntax for all key stages of data cleaning, consumption aggregate construction, poverty line update, poverty estimation, and robustness checks.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>At final submission</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Socioeconomic report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Socioeconomic report based on agreed template, indicators, and available code from previous survey rounds.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>To be determined based on scope and available inputs</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:36px\"><p>16</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:138px\"><p>Final assignment report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:324px\"><p>Summary of all outputs delivered, capacity-building outcomes, lessons learned, remaining gaps, and recommendations for institutionalizing poverty measurement capacity at GBoS.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:144px\"><p>At end of assignment</p></td></tr></tbody></table><ol><li>Required inputs from GBoS</li></ol><p>GBoS will provide the following inputs to enable successful implementation of the assignment:</p><ol><li>Q1 and Q2 GIHS datasets, Q3 dataset if available at the time of initiation, and corresponding price survey datasets before data quality flagging and data cleaning commence.</li><li>Complete and final GIHS datasets for all quarters and the final price survey dataset before poverty measurement activities commence.</li><li>Final household sampling weights before final poverty estimates and robustness checks are produced.</li><li>The previous poverty report, including the 2020 poverty report, and all supporting do-files and documentation, including Excel files, before preparation of the new poverty report begins.</li><li>The socioeconomic report template and any do-files or code used in previous survey rounds</li><li>Relevant survey instruments, manuals, metadata, price survey documentation, sampling documentation, previous methodological reports, and other materials necessary for effective poverty measurement and documentation.</li><li>Technical counterparts from GBoS to participate in data review, methodological discussions, training, mentoring, and review of outputs.</li></ol><ol><li>Duration and level of effort</li></ol><p>The assignment will be implemented over a 12-month contract period. This period represents the overall duration of consultant availability and technical support and does not imply a full-time engagement throughout the 12 months.</p><p>Accordingly, the estimated level of effort for activities with specified durations is approximately 120 working days, excluding activities for which the duration remains to be determined, such as the socioeconomic report and any additional STATA or data cleaning training that may be requested.</p><p>The final number of working days will be confirmed in the contract and aligned with the agreed scope of work, deliverables, reporting requirements, and availability of required inputs from GBoS.</p><ol><li>Indicative sequencing of activities</li></ol><p>The assignment will follow a phased sequence to ensure that training and reporting are based on sufficiently advanced technical work.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:672px\"><tbody><tr><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:52px\"><p>Phase</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:112px\"><p>Activity</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:254px\"><p>Key dependency</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:bottom; width:254px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Inception and confirmation of workplan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Contract effectiveness and initial consultations</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Inception report and detailed workplan</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Data quality flagging</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Q1 and Q2 datasets, Q3 if available, and corresponding price survey datasets</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Data quality flagging report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Data cleaning and technical discussions</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Household survey and price survey datasets</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Cleaned GIHS datasets and cleaning syntax; technical discussion notes</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Outlier detection and treatment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Preliminary review of welfare measurement variables</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Outlier detection and treatment note</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Consumption aggregate construction</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Complete and final datasets and final price survey dataset</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Consumption aggregate files and documentation; documented STATA syntax</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Poverty line update</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Final data and agreed poverty line methodology</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Poverty line update note</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Poverty estimates and robustness checks</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Final household weights from GBoS</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Poverty estimates and robustness checks</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Training preparation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Draft consumption aggregate and poverty line</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Training materials</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>In-person poverty measurement training</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Sufficiently advanced poverty measurement outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>In-person training delivery; training completion report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Poverty report and methodological report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Final poverty estimates, final weights, previous report, and supporting documentation</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Poverty report; methodological report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:52px\"><p>Phase 11</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:112px\"><p>Final reporting and submission of syntax</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Completion of all technical outputs</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:254px\"><p>Complete replicable STATA syntax; final assignment report; socioeconomic report, if required</p></td></tr></tbody></table><p>The training will not be scheduled immediately after data sharing. It will be delivered only after the consultant has substantially advanced the consumption aggregate and poverty line work.</p><ol><li>Required qualifications and experience</li></ol><p>The consultant should have the following qualifications and experience:</p><p><strong>Required Qualifications</strong></p><ul><li>Advanced degree in Economics, Development Economics, Statistics, Public Policy, or a related field. A master&rsquo;s degree in Development Economics, Labour Economics, Econometrics, Economic Policy or a closely related discipline is required.</li><li>At least ten (10) years of relevant professional experience in poverty measurement, welfare analysis, household survey implementation, and applied microeconomic analysis.</li><li>Demonstrated experience in producing official poverty estimates using household survey data, including construction of consumption aggregates and updating or constructing national poverty lines.</li><li>Strong technical expertise in welfare measurement, consumption aggregation, poverty line methodology, poverty estimation, inequality analysis, robustness checks, and policy-relevant poverty diagnostics.</li><li>Proven experience supporting national statistical offices or government counterparts in the implementation, cleaning, validation, analysis, and dissemination of household survey data.</li><li>Demonstrated experience in end-to-end household survey implementation, including questionnaire design, sampling coordination, CAPI programming or validation, real-time data quality monitoring, data cleaning, and final dataset preparation.</li><li>Advanced proficiency in statistical analysis and programming software, particularly STATA, with additional experience in Python, R, or other relevant analytical tools considered an advantage.</li><li>Demonstrated ability to prepare replicable analytical syntax, methodological documentation, poverty and inequality reports, policy briefs, and technical outputs for official and policy use.</li><li>Proven experience designing and delivering capacity-building activities, technical workshops, mentoring, and hands-on support to government or national statistical office staff in poverty measurement and data analysis.</li><li>Strong written and oral communication skills in English, with the ability to prepare clear technical documentation and communicate complex analytical issues to technical and non-technical audiences.</li></ul><p><strong>Required Experienced</strong></p><ul><li>Experience working with the World Bank, UN agencies, national statistical offices, or other international development institutions on poverty, welfare, household survey, or social policy assignments.</li><li>Experience supporting poverty measurement and welfare analysis in low- and middle-income country contexts, including fragile or institutionally complex settings.</li><li>Experience working across different regional contexts, including West Africa.</li><li>Experience preparing poverty reports, socioeconomic reports, methodological notes, policy briefs, and quality assurance documentation for official statistics or development policy purposes.</li><li>Familiarity with survey platforms and tools such as Survey Solutions, Power BI, GitHub used for data collection, visualization, reproducibility, and analytical workflow management.</li></ul><ol><li>Reporting and supervision</li></ol><p>The consultant will report to the Director of Social Statistics at GBoS and will work closely with the GIHS technical team, the Project Implementation Unit (PIU), and other designated technical counterparts.</p><p>Regular technical meetings will be held throughout the assignment. Meetings will be held more frequently during intensive data processing, poverty measurement, training, and output review periods, and at least monthly during other phases of the assignment unless otherwise agreed.</p><p>All key outputs, including cleaned datasets, syntax files, poverty estimates, training materials, poverty report, methodological report, and final assignment report, will be subject to review and approval by GBoS.</p><ol><li>Institutional arrangements</li></ol><p>GBoS will provide the consultant with access to all relevant datasets, price survey data, survey instruments, documentation, metadata, previous reports, sampling documentation, and technical counterparts required to complete the assignment.</p><p>The consultant will coordinate with the sampling consultant or designated sampling team to ensure that final household weights are correctly applied in poverty analysis. GBoS will facilitate participation of relevant technical staff in training, mentoring, technical discussions, and review of outputs.</p><p>The consultant will use his or her own computer, software, and technical equipment required to complete the assignment.</p><p>Travel and logistics will be covered under a lump-sum arrangement. The consultant will be responsible for arranging and covering travel, accommodation, and related logistics within the agreed lump sum. Local transportation will be facilitated by GBoS. No separate reimbursement will be made unless explicitly provided for in the contract.</p><ol><li>Payment schedule</li></ol><p>Payments will be linked to the satisfactory completion and approval of deliverables. The payment percentages below are indicative and may be adjusted by the PIU during contract finalization, based on the agreed scope of work, level of effort, and contract negotiations. The final payment schedule will be reflected in the signed contract.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:7.0in\"><tbody><tr><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:bottom; width:75px\"><p>Milestone</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:bottom; width:293px\"><p>Deliverable cluster</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:bottom; width:304px\"><p>Indicative Share of Total Contract Amount</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:bottom; width:75px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:bottom; width:293px\"><p>Inception report and detailed workplan</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; width:304px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:75px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:293px\"><p>Data quality flagging report, cleaned datasets, and outlier treatment note</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:75px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:293px\"><p>Consumption aggregate files, poverty line update note, and documented syntax</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:304px\"><p>40%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:75px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:293px\"><p>Poverty estimates, robustness checks, and training materials</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:75px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:293px\"><p>Delivery of in-person training and training completion report</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:304px\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:75px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:bottom; width:293px\"><p>Poverty report, methodological report, final syntax, and final assignment report</p></td></tr></tbody></table><p>&nbsp;</p><ol><li>Application Requirements</li></ol><p>Interested candidates should submit the following:</p><ol><li>Technical proposal describing the proposed methodology, workplan, sequencing of activities, capacity-building approach, and understanding of the assignment.</li><li>Financial proposal, including professional fees and all applicable travel and logistical costs where relevant.</li><li>Updated curriculum vitae demonstrating relevant qualifications and experience.</li><li>Examples of previous similar work, such as poverty analysis reports, methodological documentation, where available.</li><li>References from previous assignments of similar nature.</li></ol><ol><li>Evaluation criteria</li></ol><p>The consultant will be assessed based on the following criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; width:15%\"><p>Criteria</p></td><td style=\"background-color:#cbd3de; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:19px; width:84%\"><p>Description</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Technical expertise</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Demonstrated experience in poverty measurement, welfare analysis, welfare aggregate construction, poverty line updating or construction, inequality analysis, and household survey data analysis.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Relevant professional experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Proven experience supporting national statistical offices, government counterparts, the World Bank, UN Agencies or other development institutions in poverty analysis, household survey implementation, and production of official poverty statistics.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Methodological strength</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Quality of the proposed methodology, including understanding of data requirements, sequencing of activities, consumption aggregate construction, poverty line methodology, robustness checks, documentation, and replicability of outputs.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Household survey and data quality experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Demonstrated experience in household survey design, implementation support, data quality monitoring, data cleaning, validation, and final dataset preparation.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Capacity-building experience</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Demonstrated ability to design and deliver practical training, technical workshops, mentoring, and hands-on support to staff of national statistical offices or similar institutions.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>STATA and analytical programming proficiency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Advanced proficiency in STATA and ability to prepare documented, replicable, and well-structured syntax, with additional experience in other statistical or programming tools are considered an advantage.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Reporting and documentation ability</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Experience preparing clear, professional, and technically sound poverty reports, methodological notes, policy briefs, analytical outputs, and quality assurance documentation.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; width:15%\"><p>Availability and responsiveness</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; width:84%\"><p>Ability to support the assignment over the agreed contract period, provide timely technical inputs, and work collaboratively with GBoS, the PIU, and relevant technical counterparts.</p></td></tr></tbody></table><p>14. Contact information and submission of applications</p><p>For inquiries and submission of applications, candidates may submit their applications either in physical copies or electronically to the following:</p><ol><li>Selection Method</li></ol><p>The consultant will be selected accordance with the Individual consultant&rsquo;s selection method set out in the Procurement Regulations 2025 September of the World Bank. The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person or by e-mail) by <strong>16:00 hours GMT on or before 4th August, 2026.</strong></p><p>&nbsp;</p><p>Project Implementation Unit (PIU)<br />Gambia Bureau of Statistics (GBoS)</p><p><strong>ATTENTION:</strong> Mr. Mohammed L. Janneh, Project Coordinator</p><p>C/o Gambia Bureau of Statistics, Bijilo, The Gambia West Africa<br />Tel:&nbsp;&nbsp; 7296325, 9824270, and 2827526</p><p>E-mails: hiswacainfo@gbosgov.org mjannehhiswaca@gbosgov.org smendyhiswaca@gbosgov.org</p><p>ejabanghiswaca@gbosgov.org<u>&nbsp; hydarakutubhiswaca@gbosgov.org</u></p>"},{"id":"OP00459459","notice_type":"Request for Expression of Interest","noticedate":"19-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-28T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Marshall Islands","project_id":"P181250","project_name":"Renewable Energy Generation and Access Increase Project","bid_reference_no":"MH-MEC-563965-CS-CQS","bid_description":"Preparation of an Energy Sector Investment Program for the Marshall Islands","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"P.O. Box 1439\nMajuro, Marshall Is.\nMH 96960","contact_ctry_name":"Marshall Islands","contact_email":"jack.chonggum@mecrmi.net","contact_name":"Jack Chong-Gum","contact_organization":"Marshalls Energy Company","contact_phone_no":"(692)625 3828","contact_web_url":"meccorp@ntamar.net","submission_date":"2026-08-19T00:00:00Z","notice_text":"<p>Renewable Energy Generation and Access INcrease Project (REGAIN)</p><p>(P181250)<br />Marshall Islands</p><p>REQUEST FOR EXPRESSIONS</p><p>OF INTEREST<br />Consulting Services</p><p>For</p><p>Preparation of an Energy Sector<br />Investment Program (ESIP) for</p><p>the Marshall Islands</p><p>Grant No.: E331-MH<br />REGAIN Project<br />Reference No. MH-MEC-564965</p><p>July 31, 2026</p><p>The Government of the Republic of the Marshall Islands (GRMI) has received financing from the International<br />Development Association (IDA) (the &ldquo;Bank&rdquo;) in the form of a grant (hereinafter called &ldquo;the Grant&rdquo;), in the<br />amount of US$60 million, toward the cost of the Renewable Energy Generation and Access Increase (REGAIN)<br />Project (P181250), approved and effective as of December 13, 2024, with a closing date of September 30, 2030.<br />The Marshalls Energy Company (MEC), as Employer and implementing agency, intends to apply a portion of<br />the proceeds of the Grant to eligible payments under a contract for consulting services for the preparation of an<br />Energy Sector Investment Program (ESIP), under Sub-Component 3.1 (Sector Development Assistance) of the<br />REGAIN Project. The ESIP shall be prepared in close coordination with the newly established National Energy<br />Authority (NEA) and shall cover Majuro, Ebeye and the outer island systems.<br />The consulting services (&ldquo;the Services&rdquo;) comprise the preparation of a prioritized, costed, and financeable<br />Energy Sector Investment Programme (ESIP) for the Marshall Islands, aligned with the Government&#39;s existing<br />Energy Strategy and Integrated Resource and Resilience Plan (IRRP). The Services include, among others:<br />&bull; Targeted sector diagnostics and strategic review;<br />&bull; Review and update of the least-cost development pathway, including preparation of an updated and<br />integrated IRRP covering Majuro, Ebeye, and Outer Islands;<br />&bull; Preparation and update of the energy sector investment pipeline;<br />&bull; Renewable energy and storage target refinement;<br />&bull; Preparation of a financing strategy;<br />&bull; Preparation of a policy reform and enabling actions roadmap;<br />&bull; Preparation of an e-mobility investment and strategic framework;<br />&bull; Design of the ESIP monitoring and implementation framework;<br />&bull; Stakeholder engagement, consultations and results validation; and<br />&bull; Outer-island mini-grid (and, where suitable, mesh-grid) concept design.<br />The assignment is structured as a lump-sum contract with an estimated duration of 12 months, with an expected<br />start date in September 2026. The selected firm will nominate a multidisciplinary team, including the Key<br />Experts described below, and will report to MEC, coordinating closely with NEA, the World Bank, ADB and<br />other relevant stakeholders.<br />The Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.<br />MEC now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services.<br />Interested Consultants should provide information demonstrating that they have the required qualifications and<br />relevant experience to perform the Services.<br />The shortlisting criteria are:<br />Mandatory requirements<br />a) Firm Experience:<br />1. At least 10 years of experience in energy sector planning, energy investment planning, integrated<br />resource planning, sector development strategies, or related advisory services.</p><p>2. Successful completion of at least two similar assignments during the last ten years involving energy<br />sector investment programs, integrated resource planning, utility master planning, energy transition<br />roadmaps, or comparable strategic energy planning studies.<br />3. Demonstrated experience working in developing countries, Small Island Developing States (SIDS), or<br />geographically dispersed island power systems.<br />4. Technical and managerial capacity to undertake multidisciplinary energy sector assignments.<br />The Consultant shall demonstrate availability of qualified experts in energy sector planning, power system<br />planning, finance, policy and stakeholder engagement. Key Experts will not be evaluated at the shortlisting<br />stage.<br />Discretionary requirements<br />1. The Firm&rsquo;s ability to satisfy many or all of the following points are also considered relevant to a<br />successful application<br />o Proven ability to work effectively and sensitively in multi-cultural environments and build<br />effective business relationships with clients and colleagues.<br />o Experience of undertaking projects in a small developing state or a small island state or<br />municipality.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World<br />Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;), setting<br />forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to the following specific information<br />on conflict of interest related to this assignment:<br />Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the<br />association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners<br />in the joint venture shall be jointly and severally liable for the entire contract, if selected.<br />A Consultant will be selected in accordance with the Selection based on Consultant&rsquo;s Qualifications (CQS)<br />method set out in the World Bank Regulations for IPF-Borrowers September 2025<br />Further information can be obtained at the address below during office hours. 0900 to 1700 hours.</p><p>MEC:<br />Attn: Steve Wakefield<br />PO Box 1439<br />Majuro MH 96960<br />Republic of the Marshall Islands<br />Tel: 692-625-3827/3829<br />E-mail: swakefield@mecrmi.com<br />Copy: Jack Chong-Gum, jack.chonggum@mecrmi.net<br />EOI Submission Requirements:<br />Expressions of Interest should include the following information:<br />1. Firm profile<br />Expressions of Interest EOI must be delivered in a written form to the address below August 28th, 2026.</p><p>2. Organizational Capacity<br />3. Relevant assignments (maximum 10 projects) preferably including energy sector planning or similar<br />assignments in developing countries or small island states.<br />4. Confirmation of mandatory requirements<br />5. Company registration documents<br />Page Limit: Maximum 15 pages excluding registration documents.</p><p>Yours sincerely,</p><p>Jack Chong-Gum<br />CEO<br />Marshalls Energy Company<br />P O Box 1439, Majuro MH 96960<br />jack.chonggum@mecrmi.net</p><p>Republic of the Marshall Islands<br />Marshalls Energy Company (MEC)<br />Terms of Reference (TOR)</p><p>Preparation of an Energy Sector Investment Program for the Marshall Islands &ndash; REGAIN</p><p>Project</p><p>Project ID: P181250<br />Assignment Type: International Firm (Lump sum Contract)<br />Duration: 12 Months<br />Location: Remote with Periodic Missions to Majuro<br />1. Background<br />The Republic of the Marshall Islands (RMI) is one of the world&#39;s smallest and most isolated nations. The country<br />consists of 29 atolls and 5 low coral islands situated on about 181 square kilometres (km2) of land mass in the<br />Pacific Ocean. Majuro (the nation&#39;s capital) and Ebeye, the country&#39;s two largest urban centres, account for about<br />96 percent of total population while the remaining inhabit outer atolls. The Government of the Republic of<br />Marshall Islands, (GRMI) and MEC require assistance to increase the amount of renewable energy generation<br />and BESS in the selected islands to increase access to electricity and to reduce dependence on hydrocarbon fuels<br />for their remote populations.<br />MEC, the state-owned energy utility, generates and provides electricity to Majuro Atoll, serving 55 percent of<br />RMI&#39;s population. MEC also manages three mini grids in Jaluit, Wotje, Rongrong (Majuro Atoll) and Kili Island,<br />the latter having been recently transferred to MEC from the Kili Bikini Ejit Local Government. The Government<br />has partnered with the World Bank through the Renewable Energy Generation and Access Increase Project<br />(REGAIN) &ndash; an IDA grant of US$60 million approved and effective as of December 13, 2024, with a closing<br />date of September 30, 2030. The REGAIN project aims to increase renewable energy generation and improve<br />electricity access while reducing reliance on diesel-based generation.<br />RMI&rsquo;s Electricity Roadmap targets an objective of net zero greenhouse gas emissions and the achievement of<br />100% renewable electricity in the power generation mix by 2050. As a small and geographically dispersed island<br />nation, RMI remains highly dependent on imported diesel for electricity generation, which exposes the country<br />to high energy costs and vulnerability to global fuel price shocks. At the same time, growing electricity demand,<br />the need to improve the reliability of aging infrastructure, and the expansion of services across outer islands</p><p>require significant levels of investment in modern, resilient energy systems. Ensuring a reliable, clean, and cost-<br />effective electricity supply is therefore critical to achieving national climate commitments, strengthening energy</p><p>security, and supporting sustainable socio-economic development.<br />Under Sub-Component 3.1 of the REGAIN project (Sector Development Assistance), MEC plans to undertake a<br />study to prepare the country&rsquo;s Energy Sector Investment Program (ESIP). The ESIP shall propose and define a<br />set of detailed, prioritized energy investments to safely and reliably increase renewable energy penetration in<br />Majuro and Ebeye grids, as well as other outer islands. The ESIP shall be prepared in close coordination with the</p><p>newly established National Energy Authority (NEA), and shall cover the national footprint of RMI, including<br />Majuro, Ebeye and the outer island systems.<br />The ESIP shall take into account the full range of relevant existing studies, including but not limited to:<br />&bull; The Integrated Resource and Resilience Plan 2024-2034, which already sets out a high-level power system<br />assessment and identifies a set of proposed investments in Majuro.<br />&bull; SEDeP and REGAIN projects, including existing and new solar PV and Battery Energy Storage Systems<br />(BESS) capacity to be deployed.<br />&bull; Relevant energy sector programs and studies of other development partners active in the RMI, in particular<br />the Asian Development Bank (ADB), such as the Energy Transition Project, to be considered to ensure<br />coordination and avoid duplication of efforts.<br />&bull; RMI Electricity Roadmaps and national targets.<br />2. Objectives<br />The objective of this assignment is to prepare a prioritized, costed, and financeable Energy Sector Investment<br />Programme (ESIP) which is aligned with the existing Energy Strategy and Integrated Resource and Resilience<br />Plan (IRRP). The ESIP will build upon existing planning and strategy documents and will focus on updating,<br />operationalizing, and translating these into an actionable investment and implementation framework.<br />The ESIP should include:<br />&bull; The identification of investment priorities, including both generation and power grids.<br />&bull; Descriptions of viable approaches to financing the identified needed investments.<br />&bull; The enabling actions, including policy options to support the investment program.<br />&bull; The necessary implementation arrangements required to support delivery of national energy sector<br />objectives.<br />3. Project Description<br />The proposed ESIP project will support the development of a prioritized, costed, and implementable investment<br />program for the Marshall Islands&rsquo; energy sector, aligned with the Government&rsquo;s existing Energy Strategy and<br />considering the Integrated Resource and Resilience Plan (IRRP) for Majuro (prepared in 2024). Building on these<br />existing strategic and planning instruments, as well as an updated IRRP1</p><p>covering Majuro, Ebeye and the outer<br />island systems, the ESIP will translate national energy objectives into an actionable pipeline of investments and</p><p>enabling measures required to support sector development, energy security, resilience, decarbonization, and long-<br />term sustainability. The project will consolidate and update existing and official sector analyses and investment</p><p>priorities, while identifying financing approaches, implementation arrangements, and policy actions necessary to<br />facilitate delivery of priority investments.<br />The ESIP will include targeted sector diagnostics, a review and validation of the existing least-cost development<br />pathway, refinement of renewable energy and storage deployment trajectories, and the preparation of an updated<br />1 The updated IRRP Will be prepared as part of the present technical assistance and will include updating the existing (2024) IRRP for<br />Majuro and expanding the geographical coverage of the IRRP to also include Ebeye and the outer island systems.</p><p>energy sector investment pipeline. The project will also assess investment requirements associated with emerging<br />priorities such as grid modernization, resilience, storage integration, and e-mobility development. In parallel, the<br />ESIP will develop an overall financing strategy identifying potential public, private, concessional, and climate<br />finance sources, together with a policy reform and enabling actions roadmap aimed at addressing barriers to<br />implementation and investment mobilization.<br />The project will further establish an implementation and monitoring framework to support effective delivery and<br />tracking of the ESIP over time. Stakeholder engagement and consultation will be undertaken within the<br />assignment to ensure alignment across government institutions, utilities, development partners, and other relevant<br />stakeholders.<br />The resulting ESIP will provide a practical action plan for sequencing and financing priority energy sector<br />investments and will serve as a key tool for guiding government decision-making, coordinating development<br />partner support, and mobilizing investment into the sector.<br />4. Implementation Arrangements<br />MEC will be the Client and Employer under this assignment responsible for approving deliverables and payments.<br />NEA, as the national regulatory body for renewable energy in the Marshall Islands, will act as the principal<br />regulatory interface between MEC and the Consultant. For deliverables with regulatory or renewable energy<br />policy implications, the Consultant shall obtain NEA&#39;s endorsement prior to MEC&#39;s final approval. The Consultant<br />shall work under the direction of MEC and coordinate closely with:<br />&bull; MEC management and technical staff.<br />&bull; REGAIN Project Management Services consultant, as applicable.<br />&bull; Project Implementation Unit within MEC.<br />&bull; National Energy Authority (NEA), the national regulatory body for renewable energy, serving as the<br />regulatory interface between MEC and the Consultant.<br />&bull; World Bank on matters requiring no-objection, reporting, or implementation support.<br />&bull; ADB and other development partners active in RMI&#39;s energy sector, as relevant.<br />5. Scope of Services<br />Task 1. Targeted sector diagnostics and strategic review<br />The Consultant will undertake a focused review of the energy sector to validate key assumptions, identify material<br />developments since preparation of the IRRP and Energy Strategy, and assess investment-relevant constraints and<br />opportunities. This is a diagnostic update, as opposed to a full sector assessment.<br />Specifically, the Consultant will:<br />(i) Review of existing sector policies, strategies, and plans.<br />(ii) Review of recent sector developments and pipeline projects.<br />(iii)Assessment of institutional, financial, and implementation constraints.<br />(iv)Review of utility performance and sector financing context.<br />(v) Identification of critical sector gaps affecting investment delivery.</p><p>(vi)Validation of key demand, technology, and resilience assumptions relevant to the ESIP.<br />Task 2. Review and update of the least-cost development pathway.<br />The Consultant will review the existing least-cost development pathway established under the existing IRRP<br />(2024) for Majuro and undertake targeted updates where necessary to ensure continued relevance for investment<br />planning purposes. The Consultant will also expand the geographic focus, to also cover Ebeye and Outer Islands,<br />incorporating the results the existing IRRP update and the analyses of the Ebeye and Outer Islands into a single<br />and integrated IRRP covering the entire geographic extent of the Marshall Islands (i.e., Majuro, Ebeye, and Outer<br />Islands).<br />The key steps to be implemented include:<br />(i) The review of the underlying assumptions (especially the demand forecast, and renewable potential) used<br />in the existing IRRP for Majuro. Preparation of underlying assumptions to be used in the expanded and<br />integrated IRRP, covering Majuro, Ebeye and Outer Islands.<br />(ii) Assessment of prevailing conditions, and any material changes, affecting the least-cost pathway,<br />including:<br />a. Demand projections.<br />b. Fuel prices.<br />c. Technology potential and costs.<br />d. Resilience considerations.<br />e. Renewable integration requirements, including storage deployment needs.<br />f. Policy or regulatory developments.<br />(iii)Realization of high-level modelling and analytical updates, as required.<br />(iv)Confirmation of priority development trajectories for generation, storage, transmission, and distribution<br />investments in the Marshall Islands (covering Majuro, Ebeye, and Outer Islands).<br />(v) Preparation of the integrated and updated Marshall Islands IRRP document.<br />Task 3. Preparation and update of the energy sector investment pipeline<br />The Consultant shall develop a consolidated, prioritized, and sequenced pipeline of energy sector investments.<br />The Consultant will undertake the following:<br />(i) Consolidation of existing project pipelines and studies.<br />(ii) Update of investment requirements identified in the updated IRRP prepared under Task 2 and covering<br />the full geographic extent of the Marshall Islands, and related studies.<br />(iii)Identification of additional investment needs where gaps are identified.<br />(iv)Categorization of investments by subsector and implementation timeframe.<br />(v) Preliminary costing and sequencing of investments.<br />(vi)Identification of priority and near-term investments.<br />(vii) Development of an implementation-oriented investment pipeline, including both generation and<br />power grid infrastructure.</p><p>It is suggested that the following investment categories be used to group investments by type: renewable energy;<br />storage; transmission; distribution; resilience investments; grid modernization; energy Access; energy efficiency;<br />and e-mobility infrastructure.</p><p>Task 4. Renewable energy and storage target refinement<br />This phase is designed to support the operationalization of national renewable energy and storage ambitions<br />within the ESIP framework.<br />The Consultant shall undertake the following:<br />(i) Review of existing renewable energy and storage targets.<br />(ii) Assessment of the degree of consistency between targets, investment requirements, and implementation<br />capacity.<br />(iii)Refinement of indicative deployment trajectories where required.<br />(iv)Identification of enabling investments needed to support achievement of targets.<br />(v) Assessment of the implications for grid infrastructure and flexibility requirements.<br />It is important to note that the ESIP supports refinement and operationalization of existing targets rather than<br />formulation of entirely new national policy targets unless specifically directed.<br />Task 5. Preparation of the financing strategy<br />Under this phase, a comprehensive financing approach for implementation of the ESIP will be developed.<br />The Consultant will undertake the following:<br />(i) Estimation of financing requirements by subsector and timeframe.<br />(ii) Assessment of the public and private financing opportunities.<br />(iii)Identification of potential development partner and climate finance sources.<br />(iv)Assessment of opportunities for private sector participation and PPP models.<br />(v) Identification of financing gaps and constraints.<br />(vi)Development of recommendations for investment mobilization and project preparation.<br />The Consultant is expected to consider possible financing from the Marshall Islands&rsquo; public Budget; IFIs and<br />MDBs; climate finance; green finance instruments; IPPs/PPP structures; and commercial finance sources.<br />Task 6. Preparation of the policy reform and enabling actions roadmap<br />The aim of this phase is to identify priority policy, regulatory, institutional, and implementation measures required<br />to support delivery of the ESIP in practice in the Marshall Islands.<br />The Consultant will undertake the following activities:<br />(i) Identification of barriers affecting implementation of priority investments.<br />(ii) Review of the investment-related policy and regulatory gaps.<br />(iii)Assessment of permitting, procurement, and institutional coordination challenges.<br />(iv)Identification of utility and institutional capacity needs.<br />(v) Development of a phased roadmap of enabling actions and reforms.<br />Task 7. Preparation of the E-Mobility investment and strategic framework<br />This phase involves the assessment of implications of e-mobility development for the energy sector of the<br />Marshall Islands and identifies the associated investment and implementation requirements.</p><p>The Consultant will undertake the following:<br />(i) Review of the existing transport and e-mobility policies and initiatives.<br />(ii) Assessment of the expected electricity demand implications of e-mobility uptake.<br />(iii)Identification of charging infrastructure investment requirements.<br />(iv)Assessment of the main grid and distribution system implications.<br />(v) Identification of priority implementation actions and enabling measures.<br />(vi)Development of a high-level e-mobility framework aligned with the ESIP.<br />It is important to note that this framework is a targeted strategic and investment assessment linked specifically to<br />the Marshall Islands&rsquo; energy sector, not a standalone national transport strategy.<br />Task 8. Design of the ESIP monitoring and implementation framework<br />This phase comprises the development of a framework for monitoring implementation progress and investment<br />delivery.<br />The Consultant will undertake the following activities:<br />(i) Definition of the implementation monitoring indicators.<br />(ii) Development of reporting and governance arrangements.<br />(iii)Identification of institutional responsibilities.<br />(iv)Establishment of investment tracking mechanisms.<br />(v) Development of implementation milestones and review mechanisms.<br />(vi)Preparation of proposals on periodic ESIP update procedures.<br />It is anticipated that the monitoring and implementation framework will focus on the following key areas (and<br />others, as appropriate): investment delivery; financing mobilization; renewable deployment; grid expansion;<br />storage integration; e-mobility rollout; and resilience implementation.<br />Task 9. Stakeholder engagement, consultations and results validation<br />The Consultant will consult with and validate key assumptions and contents of the prepared ESIP with key<br />stakeholders, as appropriate, and to ensure alignment, ownership, and validation of the ESIP.<br />The Consultant will undertake the following activities:<br />(i) Planning and moderation of a stakeholder workshop to present the overall project outputs.<br />(ii) Realization of technical consultations as required, and consultations with MEC and the Marshall Islands<br />government.<br />(iii)Validation of prioritization and financing assumptions<br />Task 10. Outer-island mini-grid concept design</p><p>This phase responds to the need to improve electricity supply on selected outer islands by developing concept-<br />level designs for island mini-grids (and, where technically suitable, mesh-grid configurations). The concept</p><p>designs will inform and feed directly into the integrated IRRP (Task 2) and the energy sector investment pipeline<br />(Task 3).<br />The Consultant will undertake the following activities:</p><p>(i) Screening and prioritization of outer islands for mini-grid / mesh-grid intervention, based on<br />agreed technical, demand, and socio-economic criteria.</p><p>(ii) Assessment of existing electricity supply, demand profiles, and renewable resource potential (in<br />particular solar and storage) for the selected islands.<br />(iii)Development of concept-level system configurations, including indicative generation, storage, and<br />distribution sizing, and consideration of mini-grid versus mesh-grid architectures.<br />(iv)Preliminary technical design and equipment specifications sufficient to support investment<br />costing.<br />(v) Indicative capital and operating cost estimates and implementation sequencing for each prioritized<br />island.<br />(vi)Integration of the resulting concept designs and associated investment needs into the integrated<br />IRRP and the ESIP investment pipeline.</p><p>It is important to note that this task provides concept-level design to inform investment prioritization and costing,<br />and does not extend to detailed engineering design or tender-ready documentation, which would be undertaken<br />under subsequent project preparation.<br />6. Qualifications, Tasks, and Level of Effort of Specified Key Experts<br />The Consultant shall propose a team adequate for the assignment. In its proposal, the Consultant shall specify:<br />&bull; Each proposed key personnel position;<br />&bull; The name of the proposed expert, where available;<br />&bull; Role and responsibilities;<br />&bull; Minimum and actual qualifications and detailed relevant experience;<br />&bull; Whether the input is international or national / local;<br />&bull; Whether the input is home office or field-based;<br />&bull; Estimated level of effort in person-days or person-months; and<br />&bull; Anticipated timing of deployment and deployment location(s).<br />At a minimum, the Consultant is expected to consider inclusion of expertise and an indicative level of effort and<br />split of on-site and remote deployment, as follows:</p><p>Expert<br />Position</p><p>Key Tasks /<br />Responsibilities</p><p>Minimum Qualifications /<br />Experience</p><p>Int&rsquo;l / Nat&rsquo;l</p><p>Team Leader<br />/ Senior<br />Energy<br />Sector<br />Specialist</p><p>Overall project<br />management and project<br />coordination; lead<br />stakeholder engagement<br />and consultations.<br />Provision of strategic<br />oversight across all<br />workstreams; ensure<br />alignment with the Energy<br />Strategy and IRRP;<br />oversee preparation of all<br />draft and final<br />deliverables; coordinate<br />quality assurance and<br />reporting to the client.</p><p>Advanced degree in<br />energy, engineering,<br />economics, public policy,<br />or related field.<br />10 years of relevant<br />experience in energy sector<br />planning, investment<br />planning, or sector reform.<br />Demonstrated experience</p><p>leading similar national-<br />level energy sector</p><p>assignments.<br />Strong stakeholder</p><p>coordination and report-<br />writing experience.</p><p>International</p><p>Power<br />System<br />Planning and<br />Renewable<br />Energy<br />Specialist</p><p>Review and validate the<br />least-cost development<br />pathway and investment<br />assumptions. Assess<br />renewable energy and<br />storage deployment<br />requirements; Support<br />investment pipeline<br />development and<br />sequencing; Assess<br />transmission, distribution,<br />resilience, and grid<br />integration requirements.</p><p>Support assessment of e-<br />mobility impacts on the</p><p>power system.</p><p>Advanced degree in<br />electrical engineering,<br />energy systems, or related</p><p>field.<br />At least 8 years of<br />experience in power<br />system planning,<br />renewable energy<br />integration,<br />transmission/distribution<br />planning, or energy<br />modelling.<br />Experience of national or<br />utility-scale planning<br />studies is preferred.</p><p>International</p><p>Energy<br />Finance and<br />Investment<br />Specialist</p><p>Lead the development of<br />the financing strategy;<br />assess investment costs<br />and financing<br />requirements.<br />Identify public and private<br />financing options, climate<br />finance opportunities, and<br />PPP/IPP structures.<br />Support investment<br />prioritization and<br />affordability assessment<br />and investment<br />mobilization<br />recommendations.</p><p>Advanced degree in<br />finance, economics,<br />business, or related field.<br />At least 8 years of<br />experience in infrastructure<br />finance, energy sector<br />investment planning,<br />project finance, or climate<br />finance.<br />Experience working with<br />development finance<br />institutions and private<br />sector financing structures<br />is advantageous.</p><p>International</p><p>Policy,<br />Regulatory<br />and<br />Institutional<br />Specialist</p><p>Assess policy, regulatory,<br />and institutional barriers<br />affecting implementation<br />of priority investments.<br />Support preparation of the<br />enabling actions and<br />policy reform roadmap.<br />Assess institutional<br />coordination and<br />implementation<br />arrangements.<br />Support the development<br />of the monitoring and<br />implementation<br />framework.<br />Contribute to stakeholder<br />engagement activities.</p><p>Advanced degree in law,<br />public policy, economics,<br />energy policy, or related<br />field.<br />At least 8 years of<br />experience in energy sector<br />policy, regulation,<br />institutional reform, or<br />utility governance.<br />Experience supporting<br />implementation-focused<br />energy sector programs<br />preferred.</p><p>International</p><p>Local Energy<br />Sector /</p><p>Support local stakeholder<br />coordination, data</p><p>Relevant degree in energy,<br />engineering, economics,</p><p>National</p><p>Stakeholder<br />Engagement<br />Specialist</p><p>collection, institutional<br />engagement, workshop<br />organization, and review<br />of local sector context.<br />Facilitation of<br />coordination with<br />government agencies,<br />utilities, and local<br />stakeholders. Support in<br />project logistics and<br />consultation activities.</p><p>public administration, or<br />related field.<br />Minimum 5 years of local<br />sector experience.<br />Strong knowledge of the<br />Marshall Islands&rsquo; energy<br />sector institutions, policies,<br />and stakeholder<br />environment.<br />Fluency in English and<br />Marshallese is desirable.</p><p>7. Fees and Reimbursable Expenses<br />As this engagement will be structured as a lump-sum contract, the Consultant shall submit a financial proposal<br />(in addition to a technical proposal) that includes:<br />&bull; A total lump-sum price for the performance of the services, payable against the deliverables set out in<br />Section VIII, supported by a breakdown of professional fees by each proposed expert and personnel<br />category, indicating the applicable unit rates and estimated level of effort (person-months or person-days),<br />provided for information purposes; and<br />&bull; Reimbursable expenses, included within the lump-sum price, covering any anticipated travel,<br />accommodation, per diem, logistics, communications, and other project-related costs necessary for the<br />performance of the services.<br />The lump-sum price shall be inclusive of all costs necessary for the performance of the services. The Consultant<br />shall clearly state the assumptions underlying the proposed costs and provide sufficient detail to allow MEC to<br />assess the reasonableness of the proposed budget.<br />8. Deliverables<br />The project has six (6) main deliverables, as follows:<br />1. Inception report. This deliverable will include confirmation of the project methodology, workplan,<br />stakeholder engagement approach, data requirements, consultation schedule, and detailed approach for<br />preparation of the ESIP. An Inception workshop will be conducted with MEC and other relevant stakeholders<br />within 2 weeks from the Notice to Proceed to discuss the proposed program of activities and to seek feedback on<br />improvements, which will be reflected in the inception report.<br />2. Sector assessment and planning review report. This will be a consolidated report covering: (i) targeted sector<br />diagnostics; (ii) the results of the review and validation/update of the least-cost development pathway; (iii)<br />assessment of renewable energy and storage deployment trajectories; and (iv) the assessment of e-mobility<br />implications and associated investment needs.<br />3. Updated and integrated IRRP. This IRRP document will cover the full geographic extent of the Marshall<br />Islands. It will include all relevant updates to the existing 2024 IRRP on Majuro, as well as Ebeye and Outer<br />Islands. It will be an integrated and fully updated document. (The document may be prepared directly editing the<br />existing (2024) IRRP document in MS Word version, with all revisions and additions shown in track change<br />format).</p><p>4. Draft investment pipeline and financing strategy report. This report will cover the updated and prioritized<br />investment pipeline; and the investment sequencing and indicative costing. Furthermore, the report will set out<br />the proposed financing strategy and investment mobilization approaches; and the policy reform and enabling<br />actions roadmap. It will also present the outer-island mini-grid and mesh-grid concept designs and their<br />integration into the investment pipeline (Task 10).<br />5. Draft Energy Sector Investment Programme (Draft ESIP). This will be an integrated draft ESIP<br />consolidating all technical analyses, investment priorities, financing approaches, implementation arrangements,<br />the implementation monitoring framework, and stakeholder consultation outcomes for review and validation.<br />6. Final Energy Sector Investment Programme (Final ESIP). Final ESIP incorporating key stakeholder<br />comments. It will include the finalized investment pipeline, financing strategy, implementation roadmap, the<br />implementation monitoring framework, executive summary, and supporting annexes and presentation materials.<br />9. Contract Duration<br />The contract duration is 12 months. The expected start date is estimated to be in September 2026.</p>"},{"id":"OP00463607","notice_type":"Invitation for Bids","noticedate":"19-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-10-23T00:00:00Z","submission_deadline_time":"11:00","project_ctry_name":"Eswatini","project_id":"P508960","project_name":"Accelerating Sustainable and Clean Energy Access Transformation in Eswatini","bid_reference_no":"SZ-ECC-561950-CW-RFB","bid_description":"Design, Supply and Installation of 11kV Auto Reclosers (Plant)","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"P.O. 258 , Eluvatsini  House, Mhlambanyatsi Road\nH100, Mbabane\nEswatini","contact_ctry_name":"Eswatini","contact_email":"thobeka.gama@eec.co.sz","contact_name":"Thobeka Gama","contact_organization":"Eswatini Electricity Company","contact_phone_no":"26878332239","submission_date":"2026-08-19T00:00:00Z","notice_text":"<p><strong>Request</strong><strong> for </strong><strong>Bids</strong></p><p><strong>Plant</strong></p><p><br /><strong>Design, Supply, and Installation</strong></p><p><strong>Two-envelope with Rated Criteria</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong><strong>RFB No: </strong><em>SZ-ECC-561950-CW-RFB</em></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><strong>&nbsp;March 2025</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Request for Bids</strong></p><p><strong>Eswatini Electricity Company</strong></p><p>&nbsp;</p><p><strong>Procurement of </strong></p><p><strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></strong><strong><em> </em></strong></p><p><strong>For the </strong></p><p><strong>Accelerating Sustainable and Clean Energy Access Transformation in Eswatini</strong></p><p><strong>Project ID No: P508960</strong></p><p><strong>Employer</strong><strong>: </strong><em>Eswatini Electricity Company</em></p><p><strong>Project:<em> </em></strong><em>Accelerating Sustainable and Clean Energy Access Transformation - Eswatini</em></p><p><strong>Contract title</strong><strong>: </strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></p><p><strong>Country: </strong><em>Kingdom of Eswatini</em></p><p><strong>Loan No. /Credit No. / Grant No.:</strong><em> 7700-SZ</em></p><p><strong>RFB No: </strong><em>SZ-ECC-561950-CW-RFB</em></p><p><strong>Issued on: </strong><em>19 August 2026</em></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Standard Procurement Document</strong></p><p>&nbsp;</p><p><strong>Table of Contents</strong></p><p>&nbsp;</p><p><strong>PART 1 &ndash; Bidding Procedures. 3</strong></p><p>Section I - Instructions to Bidders. 5</p><p>Section II - Bid Data Sheet 39</p><p>Section III - Evaluation and Qualification Criteria (After prequalification) 49</p><p>Section III - Evaluation and Qualification Criteria (Without prequalification) 59</p><p>Section IV - Bidding Forms. 77</p><p>Section V - Eligible Countries. 151</p><p>Section VI - Fraud and Corruption. 153</p><p><strong>PART 2 - Employer&rsquo;s Requirements. 157</strong></p><p>Section VII - Employer&rsquo;s Requirements. 159</p><p><strong>PART 3 &ndash; Conditions of Contract and Contract Forms. 189</strong></p><p>Section VIII - General Conditions of Contract 191</p><p>Section IX - Particular Conditions of Contract 291</p><p>Section X - Contract Forms. 297</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>PART 1 &ndash; Bidding Procedures</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section I - Instructions to Bidders</strong></p><p>&nbsp;</p><p><strong>Contents</strong></p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General 8</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Bid. 8</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Source of Funds. 9</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fraud and Corruption. 9</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Eligible Bidders. 9</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Eligible Plant and Installation Services. 12</p><p><strong>B.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contents of Bidding Document 12</strong></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sections of&nbsp; Bidding Document 12</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Clarification of Bidding Document, Site Visit, Pre-Bid Meeting. 13</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Amendment of Bidding Document 15</p><p><strong>C.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preparation of Bids. 15</strong></p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cost of Bidding. 15</p><p>10.&nbsp;&nbsp;&nbsp; Language of Bid. 15</p><p>11.&nbsp;&nbsp;&nbsp; Documents Comprising the Bid. 15</p><p>12.&nbsp;&nbsp;&nbsp; Letters of Bid and Price Schedules. 17</p><p>13.&nbsp;&nbsp;&nbsp; Alternative Bids. 17</p><p>14.&nbsp;&nbsp;&nbsp; Documents Establishing the Eligibility of the Plant and Installation Services. 17</p><p>15.&nbsp;&nbsp;&nbsp; Documents Establishing the Eligibility and Qualifications of the Bidder 17</p><p>16.&nbsp;&nbsp;&nbsp; Documents Establishing the Conformity of the Plant and&nbsp; Installation Services. 18</p><p>17.&nbsp;&nbsp;&nbsp; Bid Prices and Discounts. 18</p><p>18.&nbsp;&nbsp;&nbsp; Currencies of Bid and Payment 21</p><p>19.&nbsp;&nbsp;&nbsp; Period of Validity of Bids. 21</p><p>20.&nbsp;&nbsp;&nbsp; Bid Security. 22</p><p>21.&nbsp;&nbsp;&nbsp; Format and Signing of Bid. 24</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Submission of Bids. 24</strong></p><p>22.&nbsp;&nbsp;&nbsp; Submission, Sealing and Marking of Bids. 24</p><p>23.&nbsp;&nbsp;&nbsp; Deadline for Submission of Bids. 25</p><p>24.&nbsp;&nbsp;&nbsp; Late Bids. 25</p><p>25.&nbsp;&nbsp;&nbsp; Withdrawal, Substitution, and Modification of Bids. 25</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Public Opening of Technical Parts of Bids. 26</strong></p><p>26.&nbsp;&nbsp;&nbsp; Public Opening of Technical Parts of Bids. 26</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Bids- General Provisions. 27</strong></p><p>27.&nbsp;&nbsp;&nbsp; Confidentiality. 27</p><p>28.&nbsp;&nbsp;&nbsp; Clarification of Bids. 28</p><p>29.&nbsp;&nbsp;&nbsp; Deviations, Reservations, and Omissions. 28</p><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Technical Part of Bids. 29</strong></p><p>30.&nbsp;&nbsp;&nbsp; Determination of Responsiveness of Technical Part 29</p><p>31.&nbsp;&nbsp;&nbsp; Eligibility and Qualifications of the Bidder 29</p><p>32.&nbsp;&nbsp;&nbsp; Detailed Evaluation of Technical Part 30</p><p><strong>H.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Notification of Evaluation of Technical Parts and Public Opening of Financial Parts. 30</strong></p><p>33.&nbsp;&nbsp;&nbsp; Notification of Evaluation of Technical Parts and Public Opening of Financial Parts. 30</p><p><strong>I.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Financial Part of Bids. 32</strong></p><p>34.&nbsp;&nbsp;&nbsp; Adjustments for Non-material Noconformities. 32</p><p>35.&nbsp;&nbsp;&nbsp; Correction of Arithmetic Errors. 32</p><p>36.&nbsp;&nbsp;&nbsp; Evaluation Process, Financial Part 32</p><p>37.&nbsp;&nbsp;&nbsp; Abnormally Low Bids. 33</p><p>38.&nbsp;&nbsp;&nbsp; Unbalanced or Front Loaded Bids. 33</p><p><strong>J.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Combined Technical and Financial Parts, Most Advantageous Bid and Notification of Intention to Award. 34</strong></p><p>39.&nbsp;&nbsp;&nbsp; Evaluation of combined Technical and Financial Parts, Most Advantageous Bid. 34</p><p>40.&nbsp;&nbsp;&nbsp; Employer&rsquo;s right to Accept Any Bid and to Reject Any or All Bids. 34</p><p>41.&nbsp;&nbsp;&nbsp; Standstill Period. 35</p><p>42.&nbsp;&nbsp;&nbsp; Notification of Intention to Award. 35</p><p><strong>K.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Award of Contract 35</strong></p><p>43.&nbsp;&nbsp;&nbsp; Award Criteria. 35</p><p>44.&nbsp;&nbsp;&nbsp; Notification of Award. 35</p><p>45.&nbsp;&nbsp;&nbsp; Debriefing by the Employer 36</p><p>46.&nbsp;&nbsp;&nbsp; Signing of Contract 37</p><p>47.&nbsp;&nbsp;&nbsp; Performance Security. 37</p><p>48.&nbsp;&nbsp;&nbsp; Procurement Related Complaint 38</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section I - Instructions to Bidders</strong></p><p>&nbsp;</p><table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:102%\"><tbody><tr><td colspan=\"2\" style=\"height:50px; width:99%\"><ol><li><strong>General</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Scope of Bid</strong></li></ol></td><td rowspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>In connection with the Specific Procurement Notice - Request for Bids (RFB), specified in the Bid Data Sheet (BDS), the Employer, as specified<strong> in the BDS</strong>, issues this bidding document for the Design, Supply and Installation of Plant as specified in Section VII, Employer&rsquo;s Requirements. The name, identification, and number of lots (contracts) of this RFB are specified<strong> in the BDS.</strong></li><li>Throughout this bidding document:</li></ol></li><li>the term <strong>&ldquo;in writing&rdquo; </strong>means communicated in written form (e.g., by mail, e-mail, fax, including if specified <strong>in the BDS,</strong> distributed or received through the electronic-procurement system used by the Employer) with proof of receipt;</li><li>if the context so requires, &ldquo;singular&rdquo; means &ldquo;plural&rdquo; and vice versa;</li><li><strong>&ldquo;Day&rdquo;</strong> means calendar day, unless otherwise specified as <strong>&ldquo;Business Day.&rdquo;</strong> A Business Day is any day that is an official working day of the Borrower. It excludes the Borrower&rsquo;s official public holidays;</li><li>&nbsp;<strong>&ldquo;ES&rdquo;</strong> means environmental and social (including Sexual Exploitation and Abuse (SEA), and Sexual Harassment (SH));</li><li><strong>&ldquo;Sexual Exploitation and Abuse&rdquo; &ldquo;(SEA)&rdquo;</strong> means the following:</li></ol><p><strong>Sexual Exploitation</strong> is defined as any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another.&nbsp;&nbsp;</p><p><strong>Sexual Abuse</strong> is defined as the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions.</p><ol><li><strong>&ldquo;Sexual Harassment&rdquo; &ldquo;(SH)&rdquo;</strong> is defined as unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature by the Contractor&rsquo;s Personnel with other Contractor&rsquo;s or Employer&rsquo;s Personnel.</li><li><strong>&ldquo;Contractor&rsquo;s Personnel&rdquo;</strong> is as defined in GCC Sub-Clause 1; and</li><li><strong>&ldquo;Employer&rsquo;s Personnel&rdquo;</strong> is as defined in GCC Sub-Clause 1.</li></ol><p>A non-exhaustive list of (i) behaviors which constitute SEA and (ii) behaviors which constitute SH is attached to the Code of Conduct form in Section IV.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Source of Funds</strong></li></ol></td><td rowspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Borrower or Recipient (hereinafter called &ldquo;Borrower&rdquo;) indicated<strong> in the BDS</strong> has applied for or received financing (hereinafter called &ldquo;funds&rdquo;) from the World Bank (hereinafter called &ldquo;the Bank&rdquo;) in an amount specified<strong> in BDS</strong>, toward the project named <strong>in BDS</strong>.&nbsp; The Borrower intends to apply a portion of the funds to eligible payments under the contract(s) for which this bidding document is issued.</li><li>Payment by the Bank will be made only at the request of the Borrower and upon approval by the Bank in accordance with the terms and conditions of the Loan (or other financing) Agreement. The Loan (or other financing) Agreement prohibits a withdrawal from the loan account for the purpose of any payment to persons or entities, or for any import of goods, equipment, plant, or materials, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No party other than the Borrower shall derive any rights from the Loan (or other financing) Agreement or have any claim to the proceeds of the Loan (or other financing).</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:77px; vertical-align:top; width:24%\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:5px; vertical-align:top; width:24%\"><ol><li><strong>Fraud and Corruption</strong></li></ol></td><td style=\"height:5px; vertical-align:top; width:75%\"><ol><li><ol><li>The Bank requires compliance with the Bank&rsquo;s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework, as set forth in Section VI.</li><li>In further pursuance of this policy, bidders shall permit and shall cause their agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit the Bank to inspect all accounts, records and other documents relating to any initial selection process, prequalification process, bid submission, proposal submission and contract performance (in the case of award), and to have them audited by auditors appointed by the Bank.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Eligible Bidders</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder may be a firm that is a private entity, a state-owned enterprise or institution subject to ITB 4.6, or any combination of such entities in the form of a joint venture (JV) under an existing agreement or with the intent to enter into such an agreement supported by a letter of intent.&nbsp; In the case of a joint venture, all members shall be jointly and severally liable for the execution of the entire Contract in accordance with the Contract terms. The JV shall nominate a Representative who shall have the authority to conduct all business for and on behalf of any and all the members of the JV during the Bidding process and, in the event the JV is awarded the Contract, during contract execution. Unless specified <strong>in the BDS</strong>, there is no limit on the number of members in a JV.</li><li>A Bidder shall not have a conflict of interest. Any Bidder found to have a conflict of interest shall be disqualified. A Bidder may be considered to have a conflict of interest for the purpose of this Bidding process, if the Bidder:</li></ol></li><li>directly or indirectly controls, is controlled by or is under common control with another Bidder; or</li><li>receives or has received any direct or indirect subsidy from another Bidder; or</li><li>has the same legal representative as another Bidder; or</li><li>has a relationship with another Bidder, directly or through common third parties, that puts it in a position to influence the Bid of another Bidder, or influence the decisions of the Employer regarding this Bidding process; or</li><li>or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the Plant and Installation Services that are the subject of the Bid; or</li><li>or any of its affiliates has been hired (or is proposed to be hired) by the Employer or Borrower as Project Manager for the Contract implementation; or</li><li>would be providing goods, works, or non-consulting services resulting from or directly related to consulting services for the preparation or implementation of the project specified in the BDS ITB 2.1 that it provided or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm; or</li><li>has a close business or family relationship with a professional staff of the Borrower (or of the project implementing agency, or of a recipient of a part of the loan) who: (i) are directly or indirectly involved in the preparation of the bidding document or specifications of the Contract, and/or the Bid evaluation process of such Contract; or (ii) would be involved in the implementation or supervision of such contract unless the conflict stemming from such relationship has been resolved in a manner acceptable to the Bank throughout the Bidding process and execution of the Contract.<ol><li>A firm that is a Bidder (either individually or as a JV member) shall not participate as a Bidder or as JV member in more than one Bid except for permitted alternative Bids. Such participation shall result in the disqualification of all Bids in which the firm is involved. However, this does not limit the participation of a Bidder as subcontractor in another Bid or of a firm as a subcontractor in more than one Bid.</li><li>A Bidder may have the nationality of any country, subject to the restrictions pursuant to ITB 4.8. A Bidder shall be deemed to have the nationality of a country if the Bidder is constituted, incorporated or registered in and operates in conformity with the provisions of the laws of that country, as evidenced by its articles of incorporation (or equivalent documents of constitution or association) and its registration documents, as the case may be. This criterion also shall apply to the determination of the nationality of proposed subcontractors or subconsultants for any part of the Contract including related Services.</li><li>A Bidder that has been sanctioned by the Bank, pursuant to the Bank&rsquo;s Anti-Corruption Guidelines, in accordance with its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework as described in Section VI paragraph 2.2 d., shall be ineligible to be prequalified for, initially selected for, bid for, propose for, or be awarded a Bank-financed contract or benefit from a Bank-financed contract, financially or otherwise, during such period of time as the Bank shall have determined. The list of debarred firms and individuals is available at the electronic address specified in the BDS.</li><li>Bidders that are state-owned enterprises or institutions in the Employer&rsquo;s Country may be eligible to compete and be awarded a Contract(s) only if they can establish, in a manner acceptable to the Bank, that they (i) are legally and financially autonomous (ii) operate under commercial law, and (iii) are not under supervision of the Employer.</li><li>A Bidder shall not be under suspension from Bidding by the Employer as the result of the operation of a Bid-Securing Declaration or Proposal-Securing Declaration.</li><li>Firms and individuals may be ineligible if so indicated in Section V and (a)as a matter of law or official regulations, the Borrower&rsquo;s country prohibits commercial relations with that country, provided that the Bank is satisfied that such exclusion does not preclude effective competition for the supply of goods or the contracting of works or services required; or (b)by an act of compliance with a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations, the Borrower&rsquo;s country prohibits any import of goods or contracting of works or services from that country, or any payments to any country, person, or entity in that country. Where the procurement is implemented across jurisdictional boundaries (and more than one country is a Borrower, and is involved in the procurement), then exclusion of a firm or individual on the basis of ITB 4.8 (a) above by any country may be applied to that procurement across other countries involved, if the Bank and the Borrowers involved in the procurement agree.</li><li>A Bidder shall provide such documentary evidence of eligibility satisfactory to the Employer, as the Employer shall reasonably request.&nbsp;&nbsp;&nbsp;&nbsp;</li><li>A firm that is under a sanction of debarment by the Borrower from being awarded a contract is eligible to participate in this procurement, unless the Bank, at the Borrower&rsquo;s request, is satisfied that the debarment; (a) relates to fraud or corruption, and (b) followed a judicial or administrative proceeding that afforded the firm adequate due process.</li><li>This bidding is open only to prequalified Bidders unless specified <strong>in the BDS</strong>.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:228px; vertical-align:top; width:24%\"><ol><li><strong>Eligible Plant and Installation Services</strong></li></ol></td><td style=\"height:228px; vertical-align:top; width:75%\"><ol><li><ol><li>The Plant and Installation Services to be supplied under the Contract and financed by the Bank may have their origin in any country in accordance with Section V, Eligible Countries.</li><li>For purposes of ITB 5.1 above, &ldquo;origin&rdquo; means the place where the Plant, or component parts thereof are mined, grown, produced or manufactured, and from which the services are provided.&nbsp; Plant components are produced when, through manufacturing, processing, or substantial or major assembling of components, a commercially recognized product results that is substantially different in its basic characteristics or in purpose or utility from its components.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Contents of Bidding Document</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Sections of&nbsp; Bidding Document</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The bidding document consists of Parts 1, 2, and 3, which include all the sections indicated below, and should be read in conjunction with any Addenda issued in accordance with ITB 8.</li></ol></li></ol><p><strong>PART 1. Bidding Procedures</strong></p><ul><li>Section I - Instructions to Bidders (ITB)</li><li>Section II - Bid Data Sheet (BDS)</li><li>Section III - Evaluation and Qualification Criteria</li><li>Section IV - Bidding Forms</li><li>Section V - Eligible Countries</li><li>Section VI - Fraud and Corruption</li></ul><p><strong>PART 2. Employer&rsquo;s Requirements</strong></p><ul><li>Section VII -Employer&rsquo;s Requirements</li></ul><p><strong>PART 3. Conditions of Contract and Contract Forms</strong></p><ul><li>Section VIII - General Conditions of Contract (GCC)</li><li>Section IX -Particular Conditions of Contract (PCC)</li><li>Section X -Contract Forms<ol><li>The Specific Procurement Notice-Request for Bids (RFB) issued by the Employer, or the Notice of Request for Bids (RFB) issued by the Employer to the prequalified Bidders are not part of the bidding document.</li><li>Unless obtained directly from the Employer, the Employer is not responsible for the completeness of the document, responses to requests for clarification, the Minutes of the pre-Bid meeting (if any), or Addenda to the bidding document in accordance with ITB 8. In case of any contradiction, documents obtained directly from the Employer shall prevail.</li><li>The Bidder is expected to examine all instructions, forms, terms, and specifications in the bidding document and to furnish with its Bid all information or documentation as is required by the bidding document.</li></ol></li></ul></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Clarification of Bidding Document, Site Visit, Pre-Bid Meeting</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder requiring any clarification of the bidding document shall contact the Employer in writing at the Employer&rsquo;s address indicated <strong>in the BDS </strong>or raise his enquiries during the pre-Bid meeting if provided for in accordance with ITB 7.4. The Employer will respond in writing to any request for clarification, provided that such request is received prior to the deadline for submission of Bids within a period specified <strong>in the BDS</strong>.&nbsp; The Employer shall forward copies of its response to all Bidders who have acquired the bidding document in accordance with ITB 6.3, including a description of the inquiry but without identifying its source. If so specified <strong>in the BDS</strong>, the Employer shall also promptly publish its response at the web page identified <strong>in the BDS</strong>. Should the clarification result in changes to the essential elements of the bidding document, the Employer shall amend the bidding document following the procedure under ITB 8 and ITB 23.2.</li><li>The Bidder is advised to visit and examine the site where the Plant is to be installed and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid and entering into a Contract for the provision of Plant and Installation Services. The costs of visiting the site shall be at the Bidder&rsquo;s own expense.</li><li>The Bidder and any of its personnel or agents will be granted permission by the Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the Bidder, its personnel, and agents will release and indemnify the Employer and its personnel and agents from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.</li><li>If so specified <strong>in the BDS</strong>, the Bidder&rsquo;s designated representative is invited to attend a pre-Bid meeting and/or a site visit. The purpose of the meeting will be to clarify issues and to answer questions on any matter that may be raised at that stage.</li><li>The Bidder is requested to submit any questions in writing, to reach the Employer not later than one week before the meeting.</li><li>Minutes of the pre-Bid meeting, including the text of the questions raised without identifying the source, and the responses given, together with any responses prepared after the meeting, will be transmitted promptly to all Bidders who have acquired the bidding document in accordance with ITB 6.3.&nbsp; If so specified<strong> in the BDS,</strong> the Employer shall also promptly publish the Minutes of the pre-Bid meeting at the web page identified <strong>in the BDS</strong>. Any modification to the bidding document that may become necessary as a result of the pre-Bid meeting shall be made by the Employer exclusively through the issue of an Addendum pursuant to ITB 8 and not through the minutes of the pre-Bid meeting. Nonattendance at the pre-Bid meeting will not be a cause for disqualification of a Bidder.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:232px; vertical-align:top; width:24%\"><ol><li><strong>Amendment of Bidding Document</strong></li></ol></td><td style=\"height:232px; vertical-align:top; width:75%\"><ol><li><ol><li>At any time prior to the deadline for submission of Bids, the Employer may amend the bidding document by issuing addenda.</li><li>Any addendum issued shall be part of the bidding document and shall be communicated in writing to all who have obtained the bidding document from the Employer in accordance with ITB 6.3. The Employer shall also promptly publish the addendum on the Employer&rsquo;s web page in accordance with ITB 7.1.</li><li>To give prospective Bidders reasonable time in which to take an addendum into account in preparing their Bids, the Employer may, at its discretion, extend the deadline for the submission of bids, pursuant to ITB 23.2.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Preparation of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Cost of Bidding</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall bear all costs associated with the preparation and submission of its Bid, and the Employer shall not be responsible or liable for those costs, regardless of the conduct or outcome of the Bidding process.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Language of Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bid, as well as all correspondence and documents relating to the Bid exchanged by the Bidder and the Employer, shall be written in the language specified<strong> in the BDS</strong>. Supporting documents and printed literature that are part of the Bid may be in another language provided they are accompanied by an accurate translation of the relevant passages in the language specified <strong>in the BDS</strong>, in which case, for purposes of interpretation of the Bid, such translation shall govern.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Comprising the Bid</strong></li></ol></td><td colspan=\"2\" style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bid shall comprise two Parts, namely the Technical Part and the Financial Part. These two Parts shall be submitted simultaneously in two separate sealed envelopes (two-envelope Bidding process). One envelope shall contain only information relating to the Technical Part and the other, only information relating to the Financial Part. These two envelopes shall be enclosed in a separate sealed outer envelope marked &ldquo;Original Bid&rdquo;</li><li>The Technical Part shall comprise the following:</li></ol></li><li><strong>Letter of Bid - Technical Part, prepared in accordance with ITB12;</strong></li><li><strong>Bid Security or Bid Securing Declaration, in accordance with ITB 20;</strong></li><li><strong>Alternative Bid - Technical Part: if permissible in accordance with ITB 13, the Technical Part of any Alternative Bid;</strong></li><li><strong>Authorization: written confirmation authorizing the signatory of the Bid to commit the Bidder, in accordance with ITB 21.3;</strong></li><li><strong>Eligibility of Plant and Installation Services: documentary evidence established in accordance with ITB 14.1 that the Plant and Installation Services offered by the Bidder in its Bid or in any alternative Bid, if permitted, are eligible;</strong></li><li><strong>Bidder&rsquo;s Eligibility and Qualifications: documentary evidence in accordance with ITB 15.1 establishing the Bidder&rsquo;s eligibility and qualifications ;</strong></li><li><strong>Conformity: documentary evidence in accordance with ITB 16 that the Plant and Installation Services offered by the Bidder conform to the bidding document;</strong></li><li><strong>Subcontractors: list of subcontractors in accordance with ITB 16.2; and</strong></li><li><strong>any other document required in the BDS.</strong><ol><li>The Financial Part shall contain the following:<ol><li><strong>Letter of Bid &ndash; Financial Part: prepared in accordance with ITB 12 and ITB 14;</strong></li><li><strong>Price Schedules completed in accordance with ITB 12 and ITB 17;</strong></li><li><strong>Alternative Bid - Financial Part: if permissible in accordance with ITB 13, the Financial Part of any Alternative Bid; and</strong></li><li><strong>any other document required in the BDS.</strong></li></ol></li><li>The Technical Part shall not include any information related to the Bid price. Where material financial information related to the Bid price is contained in the Technical Part the Bid shall be declared non-responsive.</li><li>In addition to the requirements under ITB 11.2, Bids submitted by a JV shall include in the Technical Part a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement.</li><li>The Bidder shall furnish in the Letter of Bid - Financial Part information on commissions and gratuities, if any, paid or to be paid to agents or any other party relating to this Bid</li></ol></li></ol></td></tr><tr><td style=\"height:48px; vertical-align:top; width:24%\"><ol><li><strong>Letters of Bid and Price Schedules</strong></li></ol></td><td style=\"height:48px; vertical-align:top; width:75%\"><ol><li><ol><li>The Letter of Bid - Technical Part and the Letter of Bid- Financial Part including the Price Schedules shall be prepared, using the relevant forms furnished in Section IV, Bidding Forms.&nbsp; The forms must be completed as instructed in each form without any alterations to the text, and no substitutes shall be accepted except as provided under ITB 21.3. All blank spaces shall be filled in with the information requested.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:451px; vertical-align:top; width:24%\"><ol><li><strong>Alternative Bids</strong></li></ol></td><td style=\"height:451px; vertical-align:top; width:75%\"><ol><li><ol><li>Unless otherwise specified<strong> in the BDS</strong>, alternative Bids shall not be considered.</li><li>When alternatives to the Time Schedule are explicitly invited, a statement to that effect will be included <strong>in the BDS</strong>, and the method of evaluating different time schedules will be described in Section III, Evaluation and Qualification Criteria.</li><li>Except as provided under ITB 13.4 below, Bidders wishing to offer technical alternatives to the Employer&rsquo;s requirements as described in the bidding document must also provide: (i) a price at which they are prepared to offer a Plant meeting the Employer&rsquo;s requirements; and (ii) all information necessary for a complete evaluation of the alternatives by the Employer, including drawings, design calculations, technical specifications, breakdown of prices, and proposed installation methodology and other relevant details.&nbsp; Only the technical alternatives, if any, of the Bidder with the Most Advantageous Bid conforming to the basic technical requirements shall be considered by the Employer.</li><li>When Bidders are invited <strong>in the BDS </strong>to submit alternative technical solutions for specified parts of the facilities, such parts <strong>will be identified</strong><strong> in the BDS</strong>, as will the method for their evaluation, and described in Section VII, Employer&rsquo;s Requirements.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Eligibility of the Plant and Installation Services</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To establish the eligibility of the Plant and Installation Services in accordance with ITB 5, Bidders shall complete the country of origin declarations in the Price Schedule Forms, included in Section IV, Bidding Forms.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Eligibility and Qualifications of the Bidder</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To establish Bidder&rsquo;s eligibility in accordance with ITB 4, Bidders shall complete the Letter of Bid- Technical Part, included in Section IV, Bidding Forms.</li><li>To establish its qualifications to perform the Contract in accordance with Section III, Evaluation and Qualification Criteria, the Bidder shall provide the information requested in the corresponding information sheets included in Section IV, Bidding Forms.</li><li>Any change in the structure or formation of a Bidder after being prequalified and invited to Bid, if applicable, (including, in the case of a JV, any change in the structure or formation of any member and also including any change in any specialized subcontractor whose qualifications were considered to prequalify the Applicant) shall be subject to the written approval of the Employer prior to the deadline for submission of Bids. Such approval shall be denied if (i) a Bidder proposes to associate with a disqualified Bidder or in case of a disqualified joint venture, any of its members; (ii) as a consequence of the change, the Bidder no longer substantially meets the qualification criteria; or (iii) in the opinion of the Employer, the change may result in a substantial reduction in competition. Any such change should be submitted to the Employer not later than fourteen (14) days after the date of the notice for RFB sent to the prequalified Bidders</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:390px; vertical-align:top; width:24%\"><ol><li><strong>Documents Establishing the Conformity of the Plant and&nbsp; Installation Services</strong></li></ol></td><td style=\"height:390px; vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall furnish the information stipulated in Section IV, Bidding Forms in sufficient detail to demonstrate substantial responsiveness of the Bidders&rsquo; proposal to the work requirements and the completion time.&nbsp;</li><li>For major items of Plant and Installation Services as listed by the Employer in Section III, Evaluation and Qualification Criteria, which the Bidder intends to purchase or subcontract, the Bidder shall give details of the name and nationality of the proposed Subcontractors, including manufacturers, for each of those items. In addition, the Bidder shall include in its Bid information establishing compliance with the requirements specified by the Employer for these items.&nbsp; Quoted rates and prices will be deemed to apply to whichever Subcontractor is appointed, and no adjustment of the rates and prices will be permitted.</li><li>The Bidder shall be responsible for ensuring that any Subcontractor proposed complies with the requirements of ITB 4, and that any Plant, or services to be provided by the Subcontractor comply with the requirements of ITB 5 and ITB 16.1.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Bid Prices and Discounts</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Unless otherwise specified <strong>in the BDS</strong>, Bidders shall quote for the entire Plant and Installation Services on a &ldquo;single responsibility&rdquo; basis. The total Bid price shall include all the Contractor&rsquo;s obligations mentioned in or to be reasonably inferred from the bidding document in respect of the design, manufacture, including procurement and subcontracting (if any), delivery, construction, installation and completion of the Plant.&nbsp; This includes all requirements under the Contractor&rsquo;s responsibilities for testing, pre-commissioning and commissioning of the Plant and, where so required by the bidding document, the acquisition of all permits, approvals and licenses, etc.; the operation, maintenance and training services and such other items and services as specified in the bidding document, all in accordance with the requirements of the General Conditions. Items against which no price is entered by the Bidder will not be paid for by the Employer when executed and shall be deemed to be covered by the prices for other items.</li><li>Bidders are required to quote the price for the commercial, contractual and technical obligations outlined in the bidding document.</li><li>Bidders shall give a breakdown of the prices in the manner and detail called for in the Price Schedules included in Section IV, Bidding Forms.</li><li>Depending on the scope of the Contract, the Price Schedules may comprise up to the six (6) schedules listed below.&nbsp; Separate numbered Schedules included in Section IV, Bidding Forms, from those numbered 1 to 4 below, shall be used for each of the elements of the Plant and Installation Services. The total amount from each Schedule corresponding to an element of the Plant and Installation Services shall be summarized in the schedule titled Grand Summary, (Schedule 5), giving the total Bid price(s) to be entered in the Letter of Bid. Bidders shall note that the plant and equipment included in Schedule Nos. 1 and 2 below exclude materials used for civil, building and other construction works.&nbsp; All such materials shall be included and priced under Schedule No. 4, Installation Services. The Schedules comprise:</li></ol></li></ol><p><strong>Schedule No. 1</strong>:&nbsp;&nbsp;&nbsp; Plant (including Mandatory Spare Parts) Supplied from Abroad</p><p><strong>Schedule No. 2</strong>:&nbsp;&nbsp;&nbsp; Plant (including Mandatory Spare Parts) Supplied from within the Employer&rsquo;s Country</p><p><strong>Schedule No. 3</strong>:&nbsp;&nbsp;&nbsp; Design Services</p><p><strong>Schedule No. 4</strong>:&nbsp;&nbsp;&nbsp; Installation Services</p><p><strong>Schedule No. 5</strong>:&nbsp;&nbsp;&nbsp; Grand Summary (Schedule Nos.1 to 4)</p><p><strong>Schedule No. 6</strong>:&nbsp;&nbsp;&nbsp; Recommended Spare Parts</p><ol><li><ol><li>In the Schedules, Bidders shall give the required details and a breakdown of their prices as follows:<ol><li>Plant to be supplied from abroad (Schedule No. 1):</li></ol></li></ol></li></ol><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The price of the Plant shall be quoted on CIP-named place of destination basis as specified <strong>in the BDS</strong>.</p><ol><li><ol><li><ol><li>Plant manufactured within the Employer&rsquo;s Country (Schedule No. 2):</li></ol></li></ol></li></ol><p>(i) &nbsp;&nbsp; The price of the Plant shall be quoted on an EXW Incoterm basis (such as &ldquo;ex-works,&rdquo; &ldquo;ex-factory,&rdquo; &ldquo;ex-warehouse&rdquo; or &ldquo;off-the-shelf,&rdquo; as applicable), including all customs duties, sales and other taxes already paid or payable on the components and raw materials used in the manufacture or assembly of the Plant;</p><p>(ii)&nbsp;&nbsp; Sales tax and all other taxes payable in the Employer&rsquo;s Country on the Plant if the contract is awarded to the Bidder;</p><ol><li><ol><li><ol><li>Design Services (Schedule No. 3);</li><li>Installation Services shall be quoted separately (Schedule No. 4) and shall include rates or prices for local transportation to named place of final destination as specified<strong> in the BDS</strong>, insurance and other services incidental to delivery of the Plant, all labor, contractor&rsquo;s equipment, temporary works, materials, consumables and all matters and things of whatsoever nature, including operations and maintenance services, the provision of operations and maintenance manuals, training, etc., where identified in the bidding document, as necessary for the proper execution of the installation and other services, including all taxes, duties, levies and charges payable in the Employer&rsquo;s Country as of twenty-eight (28) days prior to the deadline for submission of Bids;</li></ol></li></ol></li></ol><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; Recommended spare parts shall be quoted separately (Schedule 6) as specified in either subparagraph (a) or (b) above in accordance with the origin of the spare parts.</p><ol><li><ol><li>The terms EXW, CIP, and other similar terms shall be governed by the rules prescribed in the current edition of Incoterms, published by the International Chamber of Commerce, as specified<strong> in the BDS.</strong></li><li>The prices shall be either fixed or adjustable as specified<strong> in the BDS.</strong></li><li>In the case of <strong>Fixed Price</strong>, prices quoted by the Bidder shall be fixed during the Bidder&rsquo;s performance of the contract and not subject to variation on any account.&nbsp; A Bid submitted with an adjustable price quotation will be treated as non-responsive and rejected.</li><li>In the case of <strong>Adjustable Price</strong>, prices quoted by the Bidder shall be subject to adjustment during performance of the contract to reflect changes in the cost elements such as labor, material, transport and contractor&rsquo;s equipment in accordance with the procedures specified in the corresponding Appendix to the Contract Agreement. A Bid submitted with a fixed price quotation will not be rejected, but the price adjustment will be treated as zero.&nbsp; Bidders are required to indicate the source of labor and material indices in the corresponding Form in Section IV, Bidding Forms.</li><li>If so indicated in ITB 1.1, Bids are being invited for individual lots (contracts) or for any combination of lots (packages).&nbsp; Bidders wishing to offer any price reduction (discount) for the award of more than one Contract shall specify in their Letter of Bid the price reductions applicable to each package, or alternatively, to individual Contracts within the package, and the manner in which the price reductions will apply. <strong>However, discounts on condition of award of more than one contract will not be used for Bid evaluation purpose.</strong></li><li>&nbsp;Bidders wishing to offer any unconditional discount shall specify in their Letter of Bid the offered discounts and the manner in which price discounts will apply.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Currencies of Bid and Payment</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The currency(ies) of the Bid and the currency(ies) of payments shall be the same.&nbsp; The Bidder shall quote in the currency of the Employer&rsquo;s country the portion of the Bid price that corresponds to expenditures incurred in the currency of the Employer&rsquo;s Country, unless otherwise specified <strong>in the BDS</strong>.</li><li>The Bidder may express the Bid price in any currency. If the Bidder wishes to be paid in a combination of amounts in different currencies, it may quote its price accordingly but shall use no more than three foreign currencies in addition to the currency of the Employer&rsquo;s Country.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Period of Validity of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Bids shall remain valid until the date specified<strong> in the BDS</strong> or any extended date if amended by the Employer in accordance with ITB 8. A Bid that is not valid until the date specified <strong>in the BDS,</strong> or any extended date if amended by the Employer in accordance with ITB 8, shall be rejected by the Employer as nonresponsive.</li><li>In exceptional circumstances, prior to the date of expiration of the Bid validity, the Employer may request Bidders to extend the period of validity of their Bids. The request and the responses shall be made in writing. If a Bid Security is requested in accordance with ITB 20, the Bidder granting the request shall also extend the Bid Security for twenty-eight (28) days beyond the deadline of the extended validity period. A Bidder may refuse the request without forfeiting its Bid Security. A Bidder granting the request shall not be required or permitted to modify its Bid, except as provided in ITB 19.3.</li><li>If the award is delayed by a period exceeding fifty-six (56) days beyond the expiry of the initial Bid validity specified in accordance with ITB 19.1, the Contract price shall be determined as follows:</li></ol></li><li>in the case of <strong>fixed price</strong> contracts, the Contract price shall be the Bid price adjusted by the factor or factors specified<strong> in the BDS</strong>;</li><li>in the case of <strong>adjustable price</strong> contracts, no adjustment shall be made; or</li><li>in any case, Bid evaluation shall be based on the Bid price without taking into consideration the applicable correction from those indicated above.</li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Bid Security</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall furnish as part of the Technical Part of its Bid, either a Bid-Securing Declaration or a Bid Security as specified <strong>in the BDS,</strong> in original form and, in the case of a Bid Security, in the amount and currency specified<strong> in the BDS</strong>.</li><li>A Bid-Securing Declaration shall use the form included in Section IV Bidding Forms.</li><li>If a Bid Security is specified pursuant to ITB 20.1, the Bid security shall be a demand guarantee in any of the following forms at the Bidder&rsquo;s option:</li></ol></li><li>an unconditional guarantee issued by a bank or non-bank financial institution (such as an insurance, bonding or surety company);</li><li>an irrevocable letter of credit;</li><li>a cashier&rsquo;s or certified check; or</li><li>another security indicated <strong>in the BDS</strong>,</li></ol><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; from a reputable source from an eligible country. If an unconditional guarantee is issued by a non-bank financial institution located outside the Employer&rsquo;s Country the issuing non-bank financial institution shall have a correspondent financial institution located in the Employer&rsquo;s Country to make it enforceable unless the Employer has agreed in writing, prior to Bid submission, that a correspondent financial institution is not required. In the case of a bank guarantee, the Bid Security shall be submitted either using the Bid Security Form included in Section IV, Bidding Forms, or in another substantially similar format approved by the Employer prior to Bid submission. The Bid Security shall be valid for twenty-eight (28) days beyond the original date of expiry of the Bid validity, or beyond any extended date if requested under ITB 19.2.</p><ol><li><ol><li>If a Bid Security or a Bid-Securing Declaration is specified pursuant to ITB 20.1, any Bid not accompanied by a substantially responsive Bid Security or Bid-Securing Declaration shall be rejected by the Employer as nonresponsive.</li><li>If a Bid Security is specified pursuant to ITB 20.1, the Bid Security of unsuccessful Bidders shall be returned as promptly as possible upon the successful Bidder&rsquo;s furnishing of the Performance Security pursuant to ITB 47.</li><li>The Bid Security of the successful Bidder shall be returned as promptly as possible once the successful Bidder has signed the Contract and furnished the required Performance Security.</li><li>The Bid Security may be forfeited:</li></ol></li><li>if a Bidder withdraws its Bid prior to the expiry date of the Bid validity specified by the Bidder on the Letter of Bid or any extended date provided by the Bidder; or</li><li>if the successful Bidder fails to:</li></ol><ol><li>sign the Contract in accordance with ITB 46; or</li><li>furnish a Performance Security in accordance with ITB 47.<ol><li>The Bid Security or the Bid-Securing Declaration of a JV shall be in the name of the JV that submits the Bid. If the JV has not been legally constituted into a legally enforceable JV at the time of bidding, the Bid Security or the Bid Securing Declaration shall be in the names of all future members as named in the letter of intent referred to in ITB 4.1 and ITB 11.5.</li><li>If a Bid Security is not required <strong>in the BDS</strong>: and</li></ol></li></ol><ol><li>if a Bidder withdraws its Bid prior to the expiry date of the Bid validity specified by the Bidder on the Letter of Bid, or any extended date provided by the Bidder; or</li><li>if the successful Bidder fails to:</li></ol><ol><li>sign the Contract in accordance with ITB 46; or</li><li>furnish a Performance Security in accordance with ITB 47;</li></ol><p>the Borrower may<strong>, </strong>if provided for<strong> in the BDS</strong>, declare the Bidder disqualified to be awarded a contract by the Employer for a period of time as stated<strong> in the BDS</strong>.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Format and Signing of Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall prepare the Bid, in accordance with this Instruction, ITB 11 and ITB 22.</li><li>Bidders shall mark as &ldquo;Confidential&rdquo; information in their Bids which is confidential to their business. This may include proprietary information, trade secrets or commercial or financially sensitive information.</li><li>The original and all copies of the Bid shall be typed or written in indelible ink and shall be signed by a person duly authorized to sign on behalf of the Bidder.&nbsp; This authorization shall consist of a written confirmation as specified <strong>in the BDS </strong>and shall be attached to the Bid.&nbsp; The name and position held by each person signing the authorization must be typed or printed below the signature.&nbsp; All pages of the Bid where entries or amendments have been made shall be signed or initialed by the person signing the Bid.</li><li>In the case that the Bidder is a JV, the Bid shall be signed by an authorized representative of the JV on behalf of the JV, and so as to be legally binding on all the members as evidenced by a power of attorney signed by their legally authorized representatives.</li><li>Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialed by the person signing the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Submission of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Submission, Sealing and Marking of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Bidder shall deliver the Bid in two separate, sealed envelopes (the Technical Part and the Financial Part.). These two envelopes shall be enclosed in a separate sealed outer envelope marked &ldquo;Original Bid&rdquo;. In addition, the Bidder shall submit copies of the Bid in the number specified <strong>in the BDS</strong>. Copies of the Technical Part shall be placed in a separate sealed envelope marked &ldquo;Copies: Technical Part&rdquo;. Copies of the Financial Part shall be placed in a separate sealed envelope marked &ldquo;Copies: Financial Part&rdquo;. The Bidder shall place both of these envelopes in a separate, sealed outer envelope marked &ldquo;Bid Copies&rdquo;. In the event of any discrepancy between the original and the copies, the original shall prevail.</li><li>If alternative Bids are permitted in accordance with ITB 13, the alternative Bids shall be submitted as follows: the original of the alternative Bid Technical Part shall be placed in a sealed envelope marked &ldquo;Alternative Bid &ndash; Technical Part&rdquo; and the Financial Part shall be placed in a sealed envelope marked &ldquo;Alternative Bid &ndash; Financial Part&rdquo; and these two separate sealed envelopes then enclosed within a sealed outer envelope marked &ldquo;Alternative Bid &ndash; Original&rdquo;, the copies of the alternative Bid will be placed in separate sealed envelopes marked &ldquo;Alternative Bid &ndash; Copies Of Technical Part&rdquo;, and &ldquo;Alternative Bid &ndash; Copies Of Financial Part&rdquo; and enclosed in a separate sealed outer envelope marked &ldquo;Alternative Bid - Copies&rdquo;.</li><li>The envelopes marked &ldquo;Original Bid&rdquo; and &ldquo;Bid Copies&rdquo; (and, if appropriate, a third envelope marked &ldquo;Alternative Bid&rdquo;) shall be enclosed in a separate sealed outer envelope for submission to the Employer.</li><li>The inner and outer envelopes shall:</li></ol></li><li><strong>bear the name and address of the Bidder;</strong></li><li><strong>be addressed to the Employer in accordance with ITB 23.1;</strong></li><li><strong>bear the specific identification of this Bidding process indicated in accordance with ITB 1.1; and</strong></li><li><strong>bear a warning not to open before the time and date for Bid opening.</strong><ol><li>If all envelopes are not sealed and marked as required, the Employer will assume no responsibility for the misplacement or premature opening of the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Deadline for Submission of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Bids must be received by the Employer at the address and no later than the date and time indicated <strong>in the BDS</strong>. When so specified<strong> in the BDS</strong>, Bidders shall have the option of submitting their Bids electronically. Bidders submitting Bids electronically shall follow the electronic Bid submission procedures specified<strong> in the BDS</strong>.</li><li>The Employer may, at its discretion, extend the deadline for the submission of Bids by amending the bidding document in accordance with ITB 8, in which case all rights and obligations of the Employer and Bidders previously subject to the deadline shall thereafter be subject to the deadline as extended.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Late Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall not consider any Bid that arrives after the deadline for submission of Bids, in accordance with ITB 23.&nbsp; Any Bid received by the Employer after the deadline for submission of Bids shall be declared late, rejected, and returned unopened to the Bidder.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Withdrawal, Substitution, and Modification of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>A Bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and shall include a copy of the authorization in accordance with ITB 21.3, (except that withdrawal notices do not require copies). The corresponding substitution or modification of the Bid must accompany the respective written notice.&nbsp; All notices must be:</li></ol></li><li><strong>prepared and submitted in accordance with ITB 21 and ITB 22 (except that withdrawals notices do not require copies), and in addition, the respective envelopes shall be clearly marked &ldquo;Withdrawal,&rdquo; &ldquo;Substitution,&rdquo; &ldquo;Modification&rdquo;; and</strong></li><li><strong>received by the Employer prior to the deadline prescribed for submission of Bids, in accordance with ITB 23.</strong><ol><li>Bids requested to be withdrawn in accordance with ITB 25.1 shall be returned unopened to the Bidders.</li><li>No Bid may be withdrawn, substituted, or modified in the interval between the deadline for submission of Bids and the date of expiry of the Bid validity specified by the Bidder on the Letter of Bid or any extended date thereof.&nbsp;</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Public Opening of Technical Parts of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Public Opening of Technical Parts of Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Except as in the cases specified in ITB 24 and ITB 25.2, the Employer shall publicly open and read out all Bids received by the deadline at the date, time and place specified <strong>in the BDS</strong> in the presence of Bidders&rsquo; designated representatives and anyone who choose to attend. Any specific electronic Bid opening procedures required if electronic Bidding is permitted in accordance with ITB 23.1, shall be as specified <strong>in the BDS</strong>.</li><li>First, the written notice of withdrawal in the envelopes marked &ldquo;Withdrawal&rdquo; shall be opened and read out and the envelope with the corresponding Bid shall not be opened but returned to the Bidder.&nbsp; No bid withdrawal shall be permitted unless the corresponding withdrawal notice contains a valid authorization to request the withdrawal and is read out at Bid opening.</li><li>Next, envelopes marked &ldquo;Substitution&rdquo; shall be opened and read out and exchanged with the corresponding Bid being substituted, and the substituted Bid shall not be opened, but returned to the Bidder. No Bid substitution shall be permitted unless the corresponding substitution notice contains a valid authorization to request the substitution and is read out at Bid opening.</li><li>Next, envelopes marked &ldquo;Modification&rdquo; shall be opened and read out with the corresponding Bid. No Bid modification shall be permitted unless the corresponding modification notice contains a valid authorization to request the modification and is read out at Bid opening.</li><li>Next, all other envelopes marked &ldquo;Technical Part&rdquo; shall be opened one at a time. All envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; shall remain sealed and kept by the Employer in safe custody until they are opened at a later public opening, following the evaluation of the Technical Part parts of the Bids. On opening the envelopes marked &ldquo;Technical Part&rdquo; the Employer shall read out: the name of the Bidder, the presence or the absence of a Bid Security, or Bid-Securing Declaration, if required, and whether there is a modification; and Alternative Bid - Technical Part; and any other details as the Employer may consider appropriate.&nbsp;</li><li>Only Technical Parts of Bids and Alternative Bid - Technical Parts that are read out at Bid opening shall be considered further for evaluation. The Letter of Bid- Technical Part and the separate sealed envelope marked &ldquo;Second Envelope: Financial Part&rdquo; are to be initialed by representatives of the Employer attending Bid opening in the manner specified<strong> in the BDS</strong>.</li><li>The Employer shall neither discuss the merits of any Bid nor reject any Bid (except for late Bids, in accordance with ITB 24.1).</li><li>The Employer shall prepare a record of the Bid opening that shall include, as a minimum:<ol><li>the name of the Bidder and whether there is a withdrawal, substitution, or modification;</li><li>the receipt of&nbsp; envelopes marked &ldquo;Second Envelope: Financial Part&rdquo;;</li><li>if applicable, any alternative Bid-Technical Part; and</li><li>the presence or absence of a Bid Security or a Bid-Securing Declaration.&nbsp;</li></ol></li><li>The Bidders&rsquo; representatives who are present shall be requested to sign the record.&nbsp; The omission of a Bidder&rsquo;s signature on the record shall not invalidate the contents and effect of the record.&nbsp; A copy of the record shall be distributed to all Bidders.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Bids- General Provisions</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Confidentiality</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Information relating to the evaluation of the Technical Part shall not be disclosed to Bidders or any other persons not officially concerned with the Bidding process until the notification of evaluation of the Technical Part in accordance with ITB 33. Information relating to the evaluation of Financial Part, the evaluation of combined Technical Part and Financial Part, and recommendation of contract award shall not be disclosed to Bidders or any other persons not officially concerned with the RFB process until the Notification of Intention to Award the Contract is transmitted to Bidders in accordance with ITB 42..</li><li>Any effort by a Bidder to influence the Employer in the evaluation of the bids or Contract award decisions may result in the rejection of its Bid.</li><li>Notwithstanding ITB 27.2, from the time of Bid opening to the time of Contract Award, if any Bidder wishes to contact the Employer on any matter related to the Bidding process, it should do so in writing.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:266px; vertical-align:top; width:24%\"><ol><li><strong>Clarification of Bids</strong></li></ol><p>&nbsp;</p></td><td style=\"height:266px; vertical-align:top; width:75%\"><ol><li><ol><li>To assist in the examination, evaluation, and comparison of the Bids, and qualification of the Bidders, the Employer may, at its discretion, ask any Bidder for a clarification of its Bid.&nbsp; Any clarification submitted by a Bidder that is not in response to a request by the Employer shall not be considered.&nbsp; The Employer&rsquo;s request for clarification and the response shall be in writing.&nbsp; No change in the prices or substance of the Bid shall be sought, offered, or permitted, except to confirm the correction of arithmetic errors discovered by the Employer in the evaluation of the Bids, in accordance with ITB 35.</li><li>If a Bidder does not provide clarifications of its Bid by the date and time set in the Employer&rsquo;s request for clarification, its Bid may be rejected.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Deviations, Reservations, and Omissions</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>During the evaluation of Bids, the following definitions apply:</li></ol></li></ol><p>(a) &nbsp;&nbsp;&nbsp; &ldquo;Deviation&rdquo; is a departure from the requirements specified in the bidding document;</p><p>(b) &nbsp;&nbsp;&nbsp; &ldquo;Reservation&rdquo; is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the bidding document; and</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (c) &ldquo;Omission&rdquo; is the failure to submit part or all of the information or documentation required in the bidding document.</p><ol><li><ol><li>Provided that a Bid is substantially responsive, the Employer may waive any nonmaterial nonconformities in the Bid.</li><li>Provided that a Bid is substantially responsive, the Employer may request that the Bidder submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities in the Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any aspect of the price of the Bid. Failure of the Bidder to comply with the request may result in the rejection of its Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Technical Part of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Determination of Responsiveness of Technical Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s determination of the Technical Part&rsquo;s responsiveness shall be based on the contents of the Bid, as specified in ITB 11.</li><li>Preliminary examination of the Technical Part shall be carried out to identify proposals that are incomplete, invalid or substantially nonresponsive to the requirements of the Bidding documents. A substantially responsive Bid is one that materially confirms to the requirements of the Bidding document without material deviation, reservation, or omission. A material deviation, reservation, or omission is one that,</li></ol></li></ol><ol><li><ol><li>if accepted, would:<ol><li><ol><li>affect in any substantial way the scope, quality, or performance of the Works specified in the Contract; or</li><li>limit in any substantial way, inconsistent with the Bidding document, the Employer&rsquo;s rights or the Bidder&rsquo;s &nbsp;obligations under the proposed Contract; or</li></ol></li></ol></li><li>if rectified, would unfairly affect the competitive position of other Bidders presenting substantially responsive Bids.</li></ol></li></ol><ol><li><ol><li>If the Technical Part is not substantially responsive to the requirements of the Bidding document, it shall be rejected by the Employer and may not subsequently be made responsive by correction of the material deviation, reservation, or omission.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Eligibility and Qualifications of the Bidder</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall determine to its satisfaction whether the Bidders that have been assessed to have submitted substantially responsive Bids are eligible, and either continue to meet (if prequalification applies) or meet (if prequalification has not been carried out), the qualifying criteria specified in Section III, Evaluation and Qualification Criteria.</li><li>The determination shall be based upon an examination of the documentary evidence of the Bidder&rsquo;s eligibility and qualifications submitted by the Bidder, pursuant to ITB 15. The determination shall not take into consideration the qualifications of other firms such as the Bidder&rsquo;s subsidiaries, parent entities, affiliates, subcontractors (other than Specialized Subcontractors if permitted in the bidding document), or any other firm.</li><li>Prior to Contract award, the Employer will verify that the successful Bidder (including each member of a JV) is not disqualified by the Bank due to noncompliance with contractual SEA/SH prevention and response obligations. The Employer will conduct the same verification for each subcontractor proposed by the successful Bidder. If any proposed subcontractor does not meet the requirement, the Employer will require the Bidder to propose a replacement subcontractor.</li><li>Only substantially responsive bids submitted by eligible and qualified bidders shall proceed to the detailed technical evaluation specified in ITB 32.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Detailed Evaluation of Technical Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s evaluation of Technical Part will be carried out as specified in Section III, Evaluation and Qualification Criteria.</li><li>The scores and weightings to be given to Rated Criteria (including technical and non-price factors and sub factors) are specified <strong>in the BDS</strong>.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Following the completion of the evaluation of the Technical Parts of the Bids, the Employer shall notify in writing those Bidders whose Bids were considered substantially non-responsive to the bidding document or failed to meet the eligibility and qualification requirements, advising them of the following information:</li></ol></li><li>the grounds on which their Technical Part of Bid failed to meet the requirements of the bidding document;</li><li>their envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; will be returned to them unopened after the completion of the selection process and the signing of the Contract; and</li><li>notify them of the date, time and location of the public opening of the envelopes marked &ldquo;Second Envelope: Financial Part&rdquo;.<ol><li>The Employer shall, simultaneously, notify in writing those Bidders whose Technical Part have been evaluated as substantially responsive to the bidding document and met the eligibility and qualification requirements, advising them of the following information:</li></ol></li></ol><ol><li>their Bid has been evaluated as substantially responsive to the bidding document and met the eligibility and qualification requirements;</li><li>their envelope marked &ldquo;Second Envelope: Financial Part&rdquo; will be opened at the public opening of the Financial Parts; and</li><li>notify them of the date, time and location of the second public opening of the envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; as specified <strong>in the BDS.</strong><ol><li>The opening date shall be not less than ten (10) Business Days from the date of notification of the results of the technical evaluation, specified in ITB 33.1 and 33.2. However, if the Employer receives a complaint on the results of the technical evaluation within the ten (10) Business Days, the opening date shall be subject to ITB 48.1. The Financial Part of the Bid shall be opened publicly in the presence of Bidders&rsquo; designated representatives and anyone who chooses to attend.</li><li>At this public opening, the Financial Parts will be opened by the Employer in the presence of Bidders, or their designated representatives and anyone else who chooses to attend. Bidders who met the eligibility and qualification requirements and whose bids were evaluated as substantially responsive will have their envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; opened at the second public opening. Each of these envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; shall be inspected to confirm that they have remained sealed and unopened. These envelopes shall then be opened by the Employer. The Employer shall read out the names of each Bidder, the technical score and the total Bid prices, per lot (contract) if applicable, including any discounts and Alternative Bid - Financial Part, and any other details as the Employer may consider appropriate.</li><li>Only envelopes of Financial Part of Bids, Financial Parts of Alternative Bids and discounts that are opened and read out at Bid opening shall be considered further for evaluation. The Letter of Bid &ndash; Financial Part and the Priced Activity Schedules are to be initialed by a representative of the Employer attending the Bid opening in the manner specified <strong>in the BDS.</strong></li><li>The Employer shall neither discuss the merits of any Bid nor reject any envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; at this public opening.</li><li>The Employer shall prepare a record of the Financial Part of the Bid opening that shall include, as a minimum: (a) the name of the Bidder whose Financial Part was opened; (b) the Bid price, per lot (contract) if applicable, including any discounts; and (c) if applicable, any Alternative Bid &ndash; Financial Part.</li><li>The Bidders whose envelopes marked &ldquo;Second Envelope: Financial Part&rdquo; have been opened or their representatives who are present shall be requested to sign the record. The omission of a Bidder&rsquo;s signature on the record shall not invalidate the contents and effect of the record. A copy of the record shall be distributed to all Bidders<strong>. </strong></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Financial Part of Bids</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Adjustments for Non-material Noconformities</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Provided that a Bid is substantially responsive, the Employer shall rectify quantifiable nonmaterial nonconformities related to the Bid Price. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of a missing or non-conforming item or component by adding the average price of the item or component quoted by substantially responsive Bidders. <strong>&nbsp;</strong>If the price of the item or component cannot be derived from the price of other substantially responsive Bidders, the Employer shall use its best estimate.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Correction of Arithmetic Errors</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>In evaluating the Financial Part of each Bid, the Employer shall correct arithmetical errors on the following basis:</li></ol></li><li>where there are errors between the total of the amounts given under the column for the price breakdown and the amount given under the Total Price, the former shall prevail and the latter will be corrected accordingly;</li><li>where there are errors between the total of the amounts of Schedule Nos. 1 to 4 and the amount given in Schedule No. 5 (Grand Summary) the former shall prevail and the latter will be corrected accordingly;</li><li>if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to (a) and (b) above.<ol><li>Bidders shall be requested to accept correction of arithmetical errors. Failure to accept the correction in accordance with ITB 35.1, shall result in the rejection of the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Evaluation Process, Financial Part</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>To evaluate the Financial Part, the Employer shall consider the following:</li></ol></li><li>the Bid price, excluding provisional sums and the provision, if any, for contingencies in the Price Schedules;</li><li>price adjustment for correction of arithmetic errors in accordance with ITB 35.1;</li><li>price adjustment due to discounts offered in accordance with ITB 17.11;</li><li>price adjustment due to quantifiable nonmaterial nonconformities in accordance with ITB 34.1;</li><li>converting the amount resulting from applying (a) to (c) above, if relevant, to a single currency in accordance with ITB 36.2; and &nbsp;</li><li>the evaluation factors indicated in the BDS and detailed in Section III, Evaluation and Qualification Criteria.<ol><li>For evaluation and comparison purposes, the currency(ies) of the Bid shall be converted into a single currency <strong>as specified</strong><strong> in the BDS</strong>.</li><li>No margin of domestic preference shall apply.</li><li>If price adjustment is allowed in accordance with ITB 17.7, the estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in Bid evaluation.</li><li>If this bidding document allows Bidders to quote separate prices for different lots (contracts), each lot will be evaluated separately to determine the Most Advantageous Bid using the methodology specified in Section III, Evaluation and Qualification Criteria. <strong>Discounts that are conditional on the award of more than one lotor slice shall not be considered for Bid evaluation.</strong></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Abnormally Low Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>An Abnormally Low Bid is one where the Bid price, in combination with other elements of the Bid, appears so low that it raises material concerns as to the capability of the Bidder to perform the Contract for the offered Bid Price.</li><li>In the event of identification of a potentially Abnormally Low Bid, the Employer shall seek written clarifications from the Bidder, including detailed price analyses of its Bid price in correlation to the subject matter of the contract, scope, proposed methodology, schedule, allocation of risks and responsibilities and any other requirements of the bidding document.</li><li>After evaluation of the price analyses, in the event that the Employer determines that the Bidder has failed to demonstrate its capability to deliver the contract for the offered tender price, the Employer shall reject the Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Unbalanced or Front Loaded Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>If the Bid that is evaluated as the lowest evaluated cost is, in the Employer&rsquo;s opinion, seriously unbalanced or front loaded the Employer may require the Bidder to provide written clarifications. Clarifications may include detailed price analyses to demonstrate the consistency of the Bid prices with the scope of works, proposed methodology, schedule and any other requirements of the bidding document.</li><li>After the evaluation of the information and detailed price analyses presented by the Bidder, the Employer may:<ol><li>accept the Bid; or</li><li>if appropriate, require that the total amount of the Performance Security be increased, at the expense of the Bidder, to a level not exceeding twenty percent (20%) of the Contract Price; or</li><li>reject the Bid.</li></ol></li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Evaluation of Combined Technical and Financial Parts, Most Advantageous Bid and Notification of Intention to Award</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Evaluation of combined Technical and Financial Parts, Most Advantageous Bid</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer&rsquo;s evaluation of responsive Bids will take into account technical factors, in addition to cost factors in accordance with Section III Evaluation and Qualification Criteria. The weight to be assigned for the Technical factors and cost is&nbsp; specified <strong>in the BDS</strong>. The Employer will rank the Bids based on the evaluated Bid score (B).</li><li>The Employer shall determine the Most Advantageous Bid. The Most Advantageous Bid is the Bid of the Bidder that meets the Qualification Criteria and whose Bid has been determined to be substantially responsive to the Bidding document and is the Bid with the highest combined technical and financial score</li><li>The capabilities of the manufacturers and subcontractors proposed in its Bid to be used by the Bidder with the Most Advantageous Bid for identified major items of supply or services will also be evaluated for acceptability in accordance with Section III, Evaluation and Qualification Criteria.&nbsp; Their participation should be confirmed with a letter of intent between the parties, as needed.&nbsp; Should a manufacturer or subcontractor be determined to be unacceptable, the Bid will not be rejected, but the Bidder will be required to substitute an acceptable manufacturer or subcontractor without any change to the Bid price. Prior to signing the Contract, the corresponding Appendix to the Contract Agreement shall be completed, listing the approved manufacturers or subcontractors for each item concerned.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Employer&rsquo;s right to Accept Any Bid and to Reject Any or All Bids</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Employer reserves the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids at any time prior to Contract Award, without thereby incurring any liability to Bidders. In case of annulment, all Bids submitted and specifically, Bid securities shall be promptly returned to the Bidders.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Standstill Period</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The Contract shall not be awarded earlier than the expiry of the Standstill Period. The Standstill Period shall be ten (10) Business Days unless extended in accordance with ITB 45. The Standstill Period commences the day after the date the Employer has transmitted to each Bidder the Notification of Intention to Award the Contract. Where only one Bid is submitted, or if this contract is in response to an emergency situation recognized by the Bank, the Standstill Period shall not apply.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:350px; vertical-align:top; width:24%\"><ol><li><strong>Notification of Intention to Award </strong></li></ol></td><td style=\"height:350px; vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall send to each Bidder the Notification of Intention to Award the Contract to the successful Bidder. The Notification of Intention to Award shall contain, at a minimum, the following information:</li></ol></li><li>the name and address of the Bidder submitting the successful Bid;</li><li>the Contract price of the successful Bid;</li><li>the total combined score of the successful Bid;</li><li>the names of all Bidders who submitted Bids, and their Bid prices as readout, and as evaluated and technical score;</li><li>a statement of the reason(s) the Bid (of the unsuccessful Bidder to whom the notification is addressed) was unsuccessful;</li><li>the expiry date of the Standstill Period; and</li><li>instructions on how to request a debriefing and/or submit a complaint during the standstill period.</li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:99%\"><ol><li><strong>Award of Contract</strong></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Award Criteria</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Subject to ITB 40, the Employer shall award the Contract to the successful Bidder. This is the Bidder whose Bid has been determined to be the Most Advantageous Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Notification of Award</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Prior to the date of expiry &nbsp;of the bid validity, and upon expiry of the Standstill Period, specified in ITB 41.1 or any extension thereof, and upon satisfactorily addressing any complaint that has been filed within the Standstill Period, the Employer shall notify the successful Bidder, in writing, that its Bid has been accepted. The notification of award (hereinafter and in the Contract Forms called the &ldquo;Letter of Acceptance&rdquo;) shall specify the sum that the Employer will pay the Contractor in consideration of the execution of the contract (hereinafter and in the Conditions of Contract and Contract Forms called &ldquo;the Contract Price&rdquo;).</li><li>Within ten (10) Business Days after the date of transmission of the Letter of Acceptance, the Employer shall publish the Contract Award Notice which shall contain, at a minimum, the following information:</li></ol></li><li>name and address of the Employer;</li><li>name and reference number of the contract being awarded, and the selection method used;</li><li>names of all Bidders that submitted Bids, and their Bid prices as read out at Bid opening, and as evaluated;</li><li>names of all Bidders whose Bids were rejected either as nonresponsive or as not meeting qualification criteria, or were not evaluated, with the reasons therefor;</li><li>the name of the successful Bidder, the final total contract price, the contract duration and a summary of its scope; and</li><li>successful Bidder&rsquo;s Beneficial Ownership Disclosure Form.<ol><li>The Contract Award Notice shall be published on the Employer&rsquo;s website with free access if available, or in at least one newspaper of national circulation in the Employer&rsquo;s Country, or in the official gazette.</li><li>Until a formal contract is prepared and executed, the Letter of Acceptance shall constitute a binding Contract</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Debriefing by the Employer</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>On receipt of the Employer&rsquo;s Notification of Intention to Award referred to in ITB 42, an unsuccessful Bidder has three (3) Business Days to make a written request to the Employer for a debriefing. The Employer shall provide a debriefing to all unsuccessful Bidders whose request is received within this deadline.</li><li>Where a request for debriefing is received within the deadline, the Employer shall provide a debriefing within five (5) Business Days, unless the Employer decides, for justifiable reasons, to provide the debriefing outside this timeframe. In that case, the standstill period shall automatically be extended until five (5) Business Days after such debriefing is provided.&nbsp; If more than one debriefing is so delayed, the standstill period shall not end earlier than five (5) Business Days after the last debriefing takes place. The Employer shall promptly inform, by the quickest means available, all Bidders of the extended standstill period.</li><li>Where a request for debriefing is received by the Employer later than the three (3)-Business Day deadline, the Employer should provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of Public Notice of Award of contract. Requests for debriefing received outside the three (3)-day deadline shall not lead to extension of the standstill period.&nbsp;</li><li>Debriefings of unsuccessful Bidders may be done in writing or verbally. The Bidder shall bear their own costs of attending such a debriefing meeting.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:90px; vertical-align:top; width:24%\"><ol><li><strong>Signing of Contract</strong></li></ol></td><td style=\"height:90px; vertical-align:top; width:75%\"><ol><li><ol><li>The Employer shall send to the successful Bidder the Letter of Acceptance including the Contract Agreement, and a request to submit the Beneficial Ownership Disclosure Form providing additional information on its beneficial ownership. The Beneficial Ownership Disclosure Form shall be submitted within eight (8) Business Days of receiving this request.</li><li>The successful Bidder shall sign, date and return to the Employer, the Contract Agreement within twenty-eight (28) days of its receipt.</li><li>Notwithstanding ITB 46.2 above, in case signing of the Contract Agreement is prevented by any export restrictions attributable to the Employer, to the country of the Employer, or to the use of the Plant and Installation Services to be supplied, where such export restrictions arise from trade regulations from a country supplying those Plant and Installation Services, the Bidder shall not be bound by its Bid, always provided, however, that the Bidder can demonstrate to the satisfaction of the Employer and of the Bank that signing of the Contact Agreement has not been prevented by any lack of diligence on the part of the Bidder in completing any formalities, including applying for permits, authorizations and licenses necessary for the export of the Plant and Installation Services under the terms of the Contract.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Performance Security</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>Within twenty-eight (28) days of the receipt of the Letter of Acceptance from the Employer, the successful Bidder shall furnish the Performance Security in accordance with the General Conditions GCC 13.3, subject to ITB 38, using for that purpose the Performance Security Form included in Section X, Contract Forms, or another form acceptable to the Employer.&nbsp; If the Performance Security furnished by the successful Bidder is in the form of a bond, it shall be issued by a bonding or insurance company that has been determined by the successful Bidder to be acceptable to the Employer.&nbsp; A foreign institution providing a bond shall have a correspondent financial institution located in the Employer&rsquo;s Country, unless the Employer has agreed in writing that a correspondent financial institution is not required.</li><li>Failure of the successful Bidder to submit the above-mentioned Performance Security or sign the Contract shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security.&nbsp; In that event the Employer may award the Contract to the Bidder offering the next Most Advantageous Bid.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:24%\"><ol><li><strong>Procurement Related Complaint</strong></li></ol></td><td style=\"vertical-align:top; width:75%\"><ol><li><ol><li>The procedures for making a Procurement-related Complaint are as specified in the BDS.</li></ol></li></ol></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0%\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:625px\"><tbody><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:none; border-right:none; border-top:none; width:625px\"><p><strong>Section II - Bid Data Sheet</strong></p><p>The following specific data for the Facilities to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; width:625px\"><p><strong>A.&nbsp; General</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 1.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The reference number of the Request for Bids (RFB) is: <strong><em>SZ-ECC-561950-CW-RFB</em></strong></p><p>The Employer is<strong><em>: Eswatini Electricity Company (EEC).</em></strong></p><p>The name of the RFB is: <strong><em>Design, Supply and Installation of 11kV Auto reclosers (Plant)</em></strong></p><p>The number and identification of lots (contracts)<em> </em>comprising this RFB is:<strong> <em>one (1)</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 1.2 (a)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p><strong><em>N/A</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 2.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Borrower is: <strong><em>Government of Kingdom of Eswatini</em></strong></p><p>Loan or Financing Agreement amount:<strong><em> US$90 million </em></strong></p><p>The name of the Project is: <strong><em>Accelerating Sustainable and Clean Energy Access Transformation (ASCENT) Eswatini</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Maximum number of members in the JV shall be: <strong><em>Three (3)</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.5</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A list of debarred firms and individuals is available on the Bank&rsquo;s external website: http://www.worldbank.org/debarr.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 4.11</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>This Bidding Process<strong><em> is not </em></strong>subject to prequalification.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; width:625px\"><p><strong>B.&nbsp; Bidding Document</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>For <strong><u>C</u></strong><strong><u>larification of Bid purposes</u></strong> only, the Employer&rsquo;s address is:</p><p>Attention: <strong><em>Mr. Bongani Chauke, Procurement Manager</em></strong></p><p>Address: <strong><em>Po Box 258</em></strong><em>, <strong>Head Office, Eluvatsini House,</strong></em></p><p>Floor/Room number<em>: <strong>Ground Floor </strong></em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>City:<em> <strong>Mbabane&nbsp; </strong></em></p><p>Country: <strong><em>Kingdom of Eswatini (Swaziland) </em></strong></p><p>Telephone: <strong>+268 2409 4065</strong></p><p>Electronic mail address: <em>bongani.chauke@eec.co.sz</em><em>&nbsp; and </em><em>thobeka.gama@eec.co.sz</em><em> </em></p><p>Requests for clarification should be received by the Employer no later than: <strong>12 October 2026.</strong></p><p>Web page:<em> </em>www.eec.co.sz</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.4</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A pre-bid meeting <strong><em>shall </em></strong>take place at the following date, time and place:</p><p>Date: &nbsp;10 September 2026</p><p>Time: 10h00 SAST</p><p>Place: <strong>Virtual</strong></p><p><strong><em>Join: </em></strong><em>https://teams.microsoft.com/meet/350969007718107?p=iaBABpQyLOD1SvWqoV</em><em> </em></p><p><em>Meeting ID: <strong>350 969 007 718 107</strong> </em></p><p><em>Passcode: <strong>vZ7TW3mc </strong></em></p><p>A non-compulsory site visit conducted by the Employer <strong><em>shall be on 17nth and 18nth September 2026</em></strong></p><p>Telephone: <strong>+268 2409 4062&nbsp; </strong></p><p>E-mail: thobeka.gama@eec.co.sz copied to bongani.chauke@eec.co.sz</p><p>Contact person/conference coordinator:<em> <strong>Ms. Thobeka Gama, Procurement Specialist</strong></em></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 7.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Employer shall not publish the Minutes of the pre-Bid meeting on the web page. However, the minutes of the pre-Bid meeting will be circulated to all bidders who have purchased the bidding document.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>C.&nbsp; Preparation of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 10.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The language of the Bid is: <strong><em>English</em></strong></p><p>All correspondence exchange shall be in <strong><em>English</em></strong> language.</p><p>Language for translation of supporting documents and printed literature is <strong>English</strong>.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:298px; vertical-align:top; width:109px\"><p><strong>ITB 11.2 (i)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:298px; vertical-align:top; width:517px\"><p>The Bidder shall submit the following additional documents in the Technical Part of its Bid:</p><p><strong>Code of Conduct for Contractor&rsquo;s Personnel (ES) </strong></p><p>The Bidder shall submit its Code of Conduct that will apply to Contractor&rsquo;s Personnel (as defined in Sub-Clause 1.1.17 of the General Conditions of Contract), to ensure compliance with the Contractor&rsquo;s Environmental and Social (ES) obligations under the Contract. The Bidder shall use for this purpose the Code of Conduct form provided in Section IV.&nbsp; No substantial modifications shall be made to this form, except that the Bidder may introduce additional requirements, including as necessary to take into account specific Contract issues/risks.</p><p>A satisfactory code of conduct will contain obligations on all Contractor&rsquo;s Personnel project staff (including sub-contractors and day workers) that are suitable to address the following issues, as a minimum.&nbsp; Additional obligations may be added to respond to particular concerns of the region, the location and the project sector or to specific project requirements.&nbsp; The code of conduct shall contain a statement that the term &ldquo;child&rdquo; / &ldquo;children&rdquo; means any person(s) under the age of 18 years.</p><p>The issues to be addressed include:</p><p>1.&nbsp;&nbsp; Compliance with applicable laws, rules, and regulations.</p><p>2.&nbsp;&nbsp; Compliance with applicable health and safety requirements to protect the local community, the Employer&rsquo;s Personnel, and the Contractor&rsquo;s Personnel</p><p>3.&nbsp;&nbsp; Interactions with the local community(ies), members of the local community (ies), and any affected person(s) (for example to convey an attitude of respect, including to their culture and traditions)</p><p>4.&nbsp;&nbsp; Sexual harassment</p><p>5.&nbsp;&nbsp; Sexual exploitation and abuse</p><p>6.&nbsp;&nbsp; Protection of children (including prohibitions against sexual activity or abuse, or otherwise unacceptable behavior towards children, limiting interactions with children, and ensuring their safety in project areas)</p><p>7.&nbsp;&nbsp; Sanitation requirements</p><p>8.&nbsp;&nbsp; Non retaliation against workers who report violations of the Code, if that report is made in good faith.</p><p><strong>Management Strategies and Implementation Plans (MSIP) to manage the (ES) risks</strong></p><p>The Bidder shall submit<em> </em>Management Strategies and Implementation Plans (MSIPs) to manage the following key Environmental and Social (ES) risks:</p><ul><li>Gender Based Violence Action plan</li><li>Sexual Exploitation and Abuse (SEA) prevention and response action plan</li><li>Traffic Management Plan to ensure safety of local communities from construction traffic</li><li>Waste management plan</li></ul></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:109px\"><p><strong>ITB 11.3(d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:517px\"><p>The Bidder shall submit the following additional documents in the Financial Part of its Bid: <strong><em>N/A</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:109px\"><p><strong>ITB 13.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:41px; vertical-align:top; width:517px\"><p>Alternative Bids <strong><em>shall not be </em></strong>considered.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:44px; vertical-align:top; width:109px\"><p><strong>ITB 13.2</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:44px; vertical-align:top; width:517px\"><p>Alternatives to the Time Schedule <strong>shall not</strong> be permitted.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:76px; vertical-align:top; width:109px\"><p><strong>ITB 13.4</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; height:76px; vertical-align:top; width:517px\"><p>Alternative technical solutions shall not be permitted for the Plant and Installation Services.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Bidders shall quote for the following components or services on a single responsibility basis:<em> </em></p><ul><li><em>Design, supply, installation, configuration and commissioning of all 13 x 11kV auto reclosers</em></li></ul><p><strong>and</strong></p><p>The supply of the following components or services will be provided under the responsibility of the Employer:</p><ul><li>Wooden structures and steel crossarms for each installation.</li><li>11kV/230 16kVA single phase transformer for auxiliary supply with corresponding surge protection, LV MCB in pole mounted box.</li><li>Bypass 11kV gang switch</li><li>Earthing material for all 13 sites<ul><li>Clamps</li><li>Earth spikes</li><li>Camo conductor</li><li>Lugs for camo conductor</li><li>Earthing wire</li><li>Conductive cement</li></ul></li></ul></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.5 (a) and (d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Place of destination: <strong>Matsapha Central Services Organization (CSO) &ndash; EEC Main Stores, Matsapha.</strong></p><p>Final destination (Project Site): Various projects sites across the country with 150 km radius from the Matsapha Central Services Organization (CSO) &ndash; EEC Main Stores, Matsapha.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Incoterms edition is: <strong>CIP</strong>-<strong>INCOTERMS 2020</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 17.7</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The prices quoted by the Bidder <strong><em>shall not </em></strong>be subject to adjustment during the performance of the Contract.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 18.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The currency of bid and payment for Bidder from the Common Monetary Area (CMA) Countries shall be Employer&rsquo;s Country Lilangeni (SZL).</p><p>Bidder from outside the Common Monetary Area (CMA) Countries <strong><em>is</em> not </strong>required to quote in the currency of the Employer&rsquo;s Country Lilangeni (SZL), the portion of the Bid price that corresponds to expenditures incurred in the Employer&rsquo;s Country currencies.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 19.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Bid shall be valid until: <strong>23 January 2027</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 19.3 (a)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Bid price shall be adjusted by the following factor(s): <strong>Not Applicable</strong>.</p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>A Bid Security <strong>shall</strong> be required.</p><p>A Bid-Securing Declaration <strong>shall not</strong> be required.</p><p>If a Bid Security shall be required, the amount and currency of the Bid Security shall be <strong>&nbsp;E50,000.00</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.3 (d)</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>Other types of acceptable securities:<strong> NONE</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 20.9</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p><strong><em>Not applicable</em></strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 21.3</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The written confirmation of authorization to sign on behalf of the Bidder shall consist of <strong>&ldquo;Power of Attorney&rdquo;</strong> (either notarized or attested by the appropriate authority in the Bidder&rsquo;s home country) <strong>along with a copy of relevant Board Resolution.</strong></p><p>Note: The Power of Attorney shall indicate that the person signing the Bid has the authority to sign the Bid and the Bid is binding upon the Bidder during the full period of its validity. In case of a Joint venture Bid, the Power of Attorney shall be signed by the appropriate official of each of the JV partner.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>D.&nbsp; Submission and Opening of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB </strong><strong>22.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>In addition to the original Bid, the number of copies is: <strong>Two (2).</strong></p><p><strong>Notes: </strong></p><ol><li>Electronic copies of the bid shall also be submitted in Flash Drive in the technical proposal envelope.</li><li>The price schedule in MS-Excel format shall be submitted, in a separate flash drive in the financial proposal envelope. &nbsp;</li></ol></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB </strong><strong>23.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>For <strong>Bid submission purpose</strong> only, the Procuring Agency&rsquo;s address is:</p><p><strong>Eswatini Electricity Company</strong></p><p>Attention:<strong> Mr. Bongani Chauke</strong></p><p>Street Address:<strong> Eluvatsini House, Mhlambanyatsi Road&nbsp;&nbsp; </strong></p><p>Floor/ Room number:<strong> Reception&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>City: <strong>Mbabane</strong></p><p>Country: <strong>Kingdom of Eswatini</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong>The deadline for Bid submission is: </strong></p><p>Date: <strong>23 October 2026</strong></p><p>Time:<strong>11h00 SAST</strong></p><p>Bidders <strong>shall not</strong> have the option of submitting their Bids electronically.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>E. Public Opening of Technical Parts of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 26.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The <strong>Bid opening</strong> shall take place at:</p><p><strong>EEC Head Office</strong></p><p>Street Address:<strong> Eluvatsini House, Mhlambanyatsi Road</strong>&nbsp;&nbsp;</p><p>Floor/ Room number: <strong>Reception, Cubicle 1 </strong></p><p>City: <strong>Mbabane</strong></p><p>Country: <strong>Kingdom of Eswatini</strong></p><p>Date: <strong>&nbsp;23 October 2026</strong></p><p>Time: <strong>11.15 AM SAST</strong></p><p>The <strong>electronic Bid opening</strong> procedures shall be: <strong>N/A</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 26.6</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Letter of Bid - Technical Part and the sealed envelope marked &ldquo;Second Envelope - Financial Part&rdquo; shall be initialed by at least three (3) representatives of the Employer conducting Bid opening.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; height:39px; vertical-align:top; width:625px\"><p><strong>G.&nbsp; Evaluation of Technical Part of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 32.2</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The weight to be given for Rated Criteria (including technical and non-price factors) is: <strong>0.5</strong>(<strong><em>50 %)</em></strong><em> </em></p><p>The technical factors and sub-factors, which for purposes of this document carry the same meaning as Rated Criteria, and the corresponding scores in % are:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:483px\"><tbody><tr><td style=\"background-color:#92d050; width:42px\"><p><strong>No.</strong></p></td><td style=\"background-color:#92d050; width:93px\"><p><strong>Rated Criterion</strong></p></td><td style=\"background-color:#92d050; width:65px\"><p><strong>Weight</strong></p></td><td style=\"background-color:#92d050; vertical-align:top; width:283px\"><p><strong>Subfactors and weight</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px inset; border-left:1px solid black; border-right:1px solid black; border-top:none; width:42px\"><p>1</p></td><td style=\"background-color:white; border-bottom:1px inset; border-left:none; border-right:1px solid black; border-top:none; width:93px\"><p><strong>Specific Experience of bidder, capability and suitability of subcontractors</strong></p></td><td style=\"background-color:white; border-bottom:1px inset; border-left:none; border-right:1px solid black; border-top:none; width:65px\"><p><strong>15</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Relevant similar project experience [5]</li><li>Bidder capability, resources and delivery record [4]</li><li>Subcontractor suitability, experience and assigned scope [4]</li><li>Local/regional support and service capability [2]</li></ul></td></tr><tr><td style=\"width:42px\"><p>2</p></td><td style=\"width:93px\"><p><strong>Technical compliance and plant design solution</strong></p></td><td style=\"width:65px\"><p><strong>25</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Compliance with and level of exceeding employer&rsquo;s technical requirements [10]</li><li>Soundness of plant design basis and process solution efficiency [5]</li><li>Equipment selection, quality and standards compliance and superiority [5]</li><li>System integration, reliability, maintainability and operability exceeding generic standards [5]</li></ul></td></tr><tr><td style=\"width:42px\"><p>3</p></td><td style=\"width:93px\"><p><strong>Approach, Methodology, method statement and implementation plan</strong></p></td><td style=\"width:65px\"><p><strong>20</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Execution approach, procurement and logistics plan [5]</li><li>Detailed method statement and installation sequence [5]</li><li>Implementation plan, interfaces and outage management [4]</li><li>Quality control, inspection, testing and commissioning strategy [3]</li><li>Risk management, safety, environmental and social controls [3]</li></ul></td></tr><tr><td style=\"width:42px\"><p>4</p></td><td style=\"width:93px\"><p><strong>Key personnel and project organization</strong></p></td><td style=\"width:65px\"><p><strong>20</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Project manager qualifications, experience and availability [3]</li><li>Key technical personnel qualifications and relevant experience [7]</li><li>Project organization structure and reporting lines [3]</li><li>Clarity of roles, responsibilities and resource allocation [3]</li><li>Local/regional support and specialist backup [4]</li></ul></td></tr><tr><td style=\"width:42px\"><p>5</p></td><td style=\"width:93px\"><p><strong>Programme, schedule and delivery plan</strong></p></td><td style=\"width:65px\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Completeness and realism of programme [2]</li><li>Critical path, milestones and interface alignment [2]</li><li>Resource loading, float and recovery measures [1]</li></ul></td></tr><tr><td style=\"width:42px\"><p>6</p></td><td style=\"width:93px\"><p><strong>Cybersecurity risk management and innovation</strong></p></td><td style=\"width:65px\"><p><strong>5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Cybersecurity risk assessment and mitigation controls [2]</li><li>Protection of automation, control, communications and remote access systems [1]</li><li>Alignment with recognized industrial cybersecurity practices [1]</li><li>Innovation that improves safety, reliability or maintainability [1]</li></ul></td></tr><tr><td style=\"width:42px\"><p>7</p></td><td style=\"width:93px\"><p><strong>Training, documentation, warranties and lifecycle support</strong></p></td><td style=\"width:65px\"><p><strong>10</strong></p></td><td style=\"border-bottom:1px solid #9cc2e5; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:283px\"><ul><li>Training plan, content and knowledge transfer [3]</li><li>Operation and maintenance documentation [2]</li><li>Spare parts strategy and lifecycle support [3]</li><li>Warranty, after-sales service and defects liability support [2]</li></ul></td></tr><tr><td colspan=\"2\" style=\"background-color:#92d050; width:135px\"><p><strong>Total</strong></p></td><td style=\"background-color:#92d050; width:65px\"><p><strong>100</strong></p></td><td style=\"vertical-align:top; width:283px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"background-color:yellow; width:135px\"><p><strong>Minimum Acceptable Score for Technical Proposal&nbsp; </strong></p></td><td style=\"background-color:yellow; width:65px\"><p><strong>70</strong></p></td><td style=\"vertical-align:top; width:283px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>Note:</em></strong></p><ol><li><strong><em>Bidders who attain a score less than 70 shall not be considered for financial evaluation.</em></strong></li><li><strong><em>Rated Criteria, including technical and non-price factors, will be assessed for bids that meet the minimum qualification requirements and pass the pass/fail evaluation stage. This assessment focuses not on meeting minimum standards, but on the extent to which bids exceed them by adding value to the contract and introducing innovations that enhance contract performance outcomes.</em></strong></li></ol></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>H. Notification of Evaluation of Technical Parts and Public Opening of Financial Parts</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 33.5</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The Letter of Bid &ndash; Financial Part and Schedules shall<em> </em>be initialed by three (3) representatives of the Employer conducting Bid opening<em>.&nbsp; &nbsp;</em></p><p>Each Financial Part of Bid shall be initialed by 3 representatives of the employer conducting the financial opening. Any modification to the total price shall be recorded and initialed by 3 Representatives of the Employer.</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>I.&nbsp; Evaluation of Financial Part of Bids</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>36.1(f) </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The adjustments shall be determined using the following criteria, from amongst those set out in Section III, Evaluation and Qualification Criteria:</p><ol><li>Deviation in Time for Completion: <strong><em>No</em></strong></li><li>Life cycle costs: the projected operating and maintenance costs during the life of the Facilities: <strong><em>No</em></strong></li><li>Functional Guarantees of the Facilities<strong><em>: No</em></strong></li><li>Work, services, facilities, etc., to be provided by the Employer: <strong>No</strong></li></ol></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 36.2</strong></p><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The currency that shall be used for Bid evaluation and comparison purposes to convert at the selling exchange rate all Bid prices expressed in various currencies into a single currency is: <strong><em>Lilangeni (SZL)</em></strong></p><p>The source of exchange rate shall be: <strong><em>Central Bank of Eswatini</em></strong></p><p>The date for the exchange rate shall be<em>: <strong>&nbsp;23 October 2026</strong></em></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>J. Evaluation of Combined Technical and Financial Parts and Most Advantageous Bid</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 39.1 </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The weight to be given for cost is: <strong>0.5 (50%)</strong></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:625px\"><p><strong>K. Award of Contract</strong></p></td></tr><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:none; vertical-align:top; width:109px\"><p><strong>ITB 48.1</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:none; vertical-align:top; width:517px\"><p>The procedures for making a Procurement-related Complaint are detailed in the &ldquo;Procurement Regulations for IPF Borrowers (Annex III).&rdquo; If a Consultant wishes to make a Procurement-related Complaint, the Consultant shall submit its complaint following these procedures, In Writing (by the quickest means available, such as by email or fax), to:</p><p><strong>For the attention</strong>: Mr. Mphumuzi Maziya</p><p><strong>Title/position</strong>:<em> Managing Director</em></p><p><strong>Client</strong>: <em>Eswatini Electricity Company</em></p><p><strong>Email address</strong><em>: </em><em>mphumuzi.maziya@eec.co.sz</em><em> copied </em><em>bongani.chauke@eec.co.sz</em><em> </em></p><p>A copy of the complaint can be sent for the Bank&rsquo;s information and monitoring to:<strong> </strong><strong>pprocurementcomplaints@worldbank.org</strong></p><p>In summary, a Procurement-related Complaint may challenge any of the following:</p><ol><li>the terms of this Request for Proposal;</li><li>the Client&rsquo;s decision to award the contract.</li></ol></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section III - Evaluation and Qualification Criteria (Without prequalification)</strong></p><p>This section contains all the criteria that the Employer shall use to evaluate Bids and qualify Bidders. No other factors, methods or criteria shall be used other than specified in this Bidding document. The Bidder shall provide all the information requested in the forms included in Section IV, Bidding Forms.</p><p>Wherever a Bidder is required to state a monetary amount, Bidders should indicate the USD equivalent using the rate of exchange determined as follows:</p><ul><li>For turnover or financial data required for each year - Exchange rate prevailing on the last day of the respective calendar year (in which the amounts for that year is to be converted) was originally established.</li><li>Value of single contract - Exchange rate prevailing on the date of the contract.</li></ul><p>Exchange rates shall be taken from the publicly available source identified in the ITB 36.2. Any error in determining the exchange rates in the Bid may be corrected by the Employer.</p><p><strong>Table of Contents</strong></p><p>&nbsp;</p><p><strong>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualification. 61</strong></p><p><strong>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Technical Part 62</strong></p><p><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation of Financial Part 64</strong></p><p><strong>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Combined Evaluation. 66</strong></p><p><strong>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Multiple Contracts. 66</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Qualification </strong></li></ol><p><strong>1.1</strong><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualification Requirements</strong></p><p>The Bidder&rsquo;s qualification shall be assessed in accordance with the Qualification table included in this section.</p><p><strong>1.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Representative and other Key Personnel</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder must demonstrate that it will have suitably qualified Contractor&rsquo;s Representative and other suitably qualified (and in adequate numbers) key personnel, as described in the Employer&rsquo;s Requirements.</p><p>The Bidder shall provide details of the Contractor&rsquo;s Representative and other key personnel, and such other key personnel that the Bidder considers appropriate, together with their academic qualifications and work experience. The Bidder shall complete the relevant Forms in Section IV, Bid Forms.</p><p><strong>1.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder must demonstrate that it will have access to the key equipment required to perform the contract.</p><p>The Bidder shall provide further details of proposed items of equipment using the relevant Form in Section IV.</p><p><strong>1.4&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Subcontractors/Manufacturers</strong></p><p>Subcontractors/manufacturers for major items of supply or services identified in the Initial Selection document must meet or continue to meet the minimum criteria specified therein for each item.</p><p>Subcontractors for the following additional major items of supply or services must meet the following minimum criteria, herein listed for that item:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:511px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; width:42px\"><p><strong>Item No.</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:244px\"><p><strong>Description of Item</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:225px\"><p><strong>Minimum Criteria to be met</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Telecommunication equipment</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>5 years&rsquo; experience in supplying and installing telecommunication equipment</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Overhead line construction</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>5 years&rsquo; experience in distribution infrastructure construction</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>11kV Auto reclosers</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>10 years&rsquo; experience in the manufacturing of auto reclosers</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:244px\"><p>Protection and SCADA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:225px\"><p>10 Years experience in protection and automation of electrical transmission or distribution systems</p></td></tr></tbody></table><p>&nbsp;</p><p>Failure to comply with this requirement will result in rejection of the subcontractor.</p><p>In the case of a Bidder who offers to supply and/or install Plant and equipment under the contract that the Bidder did not manufacture or otherwise produce and/or install, the Bidder shall provide the <strong>manufacturer&rsquo;s authorization</strong>, using the form provided in Section IV, showing that the Bidder has been duly authorized by the manufacturer or producer of the related Plant and equipment or component to supply and/or install that item in the Employer&rsquo;s country. The Bidder is responsible for ensuring that the manufacturer or producer complies with the requirements of <strong>ITB 4</strong> and <strong>ITB 5</strong> and meets the minimum criteria listed above for that item.</p><ol><li><strong>Evaluation of Technical Part </strong></li></ol><p>The total technical points assigned to each Bid in the Evaluated Bid &nbsp;Formula will be determined by adding and weighting the scores assigned by an evaluation committee to technical factors of the Bid &nbsp;in accordance with the criteria set forth below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:671px\"><tbody><tr><td style=\"background-color:#92d050\"><p><strong>No.</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Rated Criterion</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Weight</strong></p></td><td style=\"background-color:#92d050; width:400px\"><p><strong>Key Assessment Considerations</strong></p></td></tr><tr><td style=\"background-color:white\"><p>1</p></td><td style=\"background-color:white\"><p>Specific Experience of bidder, capability and suitability of subcontractors</p></td><td style=\"background-color:white\"><p>15%</p></td><td style=\"background-color:white; width:400px\"><ul><li>Demonstrated experience of the bidder in successfully completing similar assignment</li><li>Relevance of previous projects in terms of plant type, capacity, complexity, technology, operating environment and contract scope.</li><li>Evidence of successful delivery within agreed time, cost, quality, safety and performance requirements.</li><li>Suitability, capability and experience of proposed subcontractors for their assigned scope of work.</li><li>Clarity of subcontractor roles, responsibilities, interfaces and reporting arrangements.</li></ul><ul><li>Evidence that subcontractors have the required technical qualifications, resources, certifications, equipment and specialist expertise.</li><li>Prior working relationship between the main bidder and proposed subcontractors, including evidence of successful collaboration on similar projects.</li></ul><ul><li>Availability of local or regional support, service capability, spare parts access and specialist backup during implementation and defects liability period.</li></ul></td></tr><tr><td><p>2</p></td><td><p>Technical compliance and plant design solution</p></td><td><p>25%</p></td><td style=\"width:400px\"><ul><li>Compliance with employer&rsquo;s requirements;</li><li>process design basis; performance guarantees; equipment selection; system integration; reliability, maintainability and operability; interfaces with existing infrastructure;</li><li>compliance with applicable standards.</li></ul></td></tr><tr><td><p>3</p></td><td><p>Approach, Methodology, method statement and implementation plan</p></td><td><p>20%</p></td><td style=\"width:400px\"><ul><li>Clarity and completeness of execution approach procurement and logistics plan</li><li>installation sequence; construction methodology detailed method statement; implementation plan; quality control;</li><li>inspection and test plans</li><li>commissioning strategy;</li><li>outage/interface management;</li><li>Completeness of project risk management</li><li>safety, environmental &amp; social risk controls.</li></ul></td></tr><tr><td><p>4</p></td><td><p>Key personnel and project organization</p></td><td><p>20%</p></td><td style=\"width:400px\"><ul><li>Qualifications,</li><li>relevant experience and availability of proposed personnel</li><li>strength of project management structure</li><li>clarity of roles and responsibilities</li><li>&nbsp;experience in similar plant design, supply and installation contracts</li><li>Loca/regional support and specialist backup.</li></ul></td></tr><tr><td><p>5</p></td><td><p>Programme, schedule and delivery plan</p></td><td><p>5%</p></td><td style=\"width:400px\"><ul><li>Completeness of the programme</li><li>critical path identification</li><li>engineering, procurement, manufacturing, delivery, installation, testing and commissioning timelines</li><li>resource loading; milestone alignment; float and recovery measures.</li></ul></td></tr><tr><td><p>6</p></td><td><p>Cybersecurity risk management and innovation</p></td><td><p>5%</p></td><td style=\"width:400px\"><ul><li>Assessment and management of cyber risks affecting plant automation, control, communications, remote access, vendor access, software, firmware, data integrity and operational continuity;</li><li>alignment with recognized industrial control system cybersecurity practices;</li><li>practical innovations that reduce cyber risk without compromising plant safety, reliability or maintainability.</li><li>Compliance with cybersecurity requirements</li></ul></td></tr><tr><td><p>7</p></td><td><p>Training, documentation, warranties and lifecycle support</p></td><td><p>10%</p></td><td style=\"width:400px\"><ul><li>Completeness of training plan and content; operation and maintenance documentation;</li><li>spare parts strategy and warranty support; after-sales service; regional maintenance capability; defects liability support.</li></ul></td></tr><tr><td><p><strong>Total</strong></p></td><td>&nbsp;</td><td><p><strong>100%</strong></p></td><td style=\"width:400px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>TECHINICAL PART SCORING METHOLOGY</strong></p><p>Evaluators will apply the following scoring guidance consistently to each rated criterion. Scores will be based on the extent to which the bidder&rsquo;s submission demonstrates compliance, completeness, relevance, credibility of evidence, and practical suitability for the required scope of work.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:101.1%\"><tbody><tr><td style=\"background-color:#92d050\"><p><strong>Score</strong></p></td><td style=\"background-color:#92d050\"><p><strong>Rating</strong></p></td><td style=\"background-color:#92d050; width:74%\"><p><strong>General Scoring Guidance</strong></p></td></tr><tr><td><p>0</p></td><td><p>Non-responsive / No evidence</p></td><td style=\"width:74%\"><p>The submission does not address the criterion, provides no relevant evidence, or contains information that is materially non-compliant with the requirements. The response gives the evaluator no reasonable basis to confirm capability, compliance, or suitability.</p></td></tr><tr><td><p>1</p></td><td><p>Poor</p></td><td style=\"width:74%\"><p>The submission addresses the criterion only superficially or partially. Evidence is weak, generic, insufficient, incomplete, or not clearly relevant to the required scope. There are significant gaps, uncertainties, or weaknesses that may create delivery, compliance, performance, safety, operational, or support risks.</p></td></tr><tr><td><p>2</p></td><td><p>Acceptable</p></td><td style=\"width:74%\"><p>The submission adequately addresses the criterion and demonstrates basic compliance with the requirements. Evidence is generally relevant and sufficient, although some details may be missing or not fully developed. Any minor weaknesses are manageable and are not expected to materially affect delivery of the required scope.</p></td></tr><tr><td><p>3</p></td><td><p>Good</p></td><td style=\"width:74%\"><p>The submission addresses the criterion clearly and comprehensively. Evidence is relevant, credible, and well aligned with the requirements. The response demonstrates sound understanding, suitable capability, and a practical approach marginally exceeding minimum or generic standards. Even if there are very minor omissions or risks that can be readily clarified or managed.</p></td></tr><tr><td><p>4</p></td><td><p>Excellent</p></td><td style=\"width:74%\"><p>The submission fully addresses the criterion and exceeds the minimum requirements in a meaningful and relevant way. Evidence is strong, specific, verifiable, and directly applicable to the scope. The response demonstrates superior capability, robust risk controls, clear interfaces, reliable delivery arrangements, and added value without introducing unacceptable risk.</p></td></tr></tbody></table><p>&nbsp;</p><p>The score for each sub- factor (i) within a factor (j) will be combined with the scores of sub- factors in the same factor as a weighted sum to form the Factor Technical Score using the following formula:</p><p>&nbsp;</p><p>where:</p><p><em>tji&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>= the technical score for sub- factor &ldquo;i&rdquo; in factor &ldquo;j&rdquo;</p><p><em>wji</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the weight of sub- factor &ldquo;i&rdquo; in factor &ldquo;j&rdquo;,</p><p><em>k</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the number of scored sub-factors in factor &ldquo;j&rdquo;</p><p>and&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;</p><p>The Factor Technical Scores will be combined in a weighted sum to form the total Technical Part Score using the following formula:</p><p>&nbsp;</p><p>where:</p><p><em>Sj</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the Factor Technical Score of factor &ldquo;j&rdquo;</p><p><em>Wj</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the weight of factor &ldquo;j&rdquo; as specified in the BDS</p><p><em>n</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp; the number of Factors</p><p>and&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong><em>Note: After the technical evaluation only, only bids that attains a score of 70 % and or above shall be considered for financial evaluation.</em></strong></p><p>&nbsp;</p><ol><li><strong>Evaluation of Financial Part</strong></li></ol><p>The following factors and methods will apply:</p><ol><li><ol><li><strong>Time Schedule</strong></li></ol></li></ol><p>Time to complete the Plant and Installation Services from the effective date specified in Article 3 of the Contract Agreement for determining time for completion of pre-commissioning activities is 6 months. No credit will be given for earlier completion.</p><p>&nbsp;</p><p>Note: A compliant Bid must offer a contract completion within the time specified above. Bids offering a completion date beyond the maximum designated period shall be rejected as non-responsive.</p><p>&nbsp;</p><ol><li><ol><li><strong>Life Cycle Costs </strong></li></ol></li></ol><p><strong>None</strong></p><p>&nbsp;</p><ol><li><ol><li><strong>Functional Guarantees of the Facilities</strong></li></ol></li></ol><p>The minimum requirements stated in the Specification for functional guarantees required in the Specification are:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:499px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:181px\"><p><strong>Functional Guarantee</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:318px\"><p><strong>Minimum (or Maximum, as appropriate) Requirement </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:181px\"><p>1. All 11 kV auto reclosers as stated in the employer&rsquo;s requirements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:318px\"><p>100% operational functionality throughout the Warranty Period &amp; Design Life.</p></td></tr></tbody></table><p>&nbsp;</p><p>The performance figures quoted on forms-FUNC and Technical Data Sheet shall be guaranteed within the tolerances permitted by relevant standards listed under Part-II, Employer&rsquo;s Requirement, and shall become a part of the successful Bidder&#39;s Contract. For the purposes of evaluation, for each percentage point the functional guarantee of the proposed Plant and Installation Services is below the norm specified in the Specification and in the above table, but above the minimum acceptable levels also specified therein, an adjustment of 5% will be added to the Bid price.&nbsp; If the drop below the norm the Auto reclosers will be rejected.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><strong>&nbsp;Sustainable Procurement</strong></li></ol></li></ol><p><strong><em>None</em></strong></p><p>&nbsp;</p><ol><li><ol><li><strong>Work, services, facilities, etc., to be provided by the Employer</strong></li></ol></li></ol><p><strong>None</strong></p><p>&nbsp;</p><ol><li><strong>Combined Evaluation </strong></li></ol><p>The Employer will evaluate and compare the Bids that have been determined to be substantially responsive.</p><p>An Evaluated Bid Score (B) will be calculated for each responsive Bid using the following formula, which permits a comprehensive assessment of the evaluated cost and the technical merits of each Bid:</p><p>&nbsp;</p><p>where</p><p><em>C</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluated Bid Cost</p><p><em>C low</em> =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the lowest of all Evaluated Bid Costs among responsive Bids</p><p><em>T</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the total Technical Score awarded to the Bid</p><p><em>Thigh</em>&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the Technical Score achieved by the Bid&nbsp; that was scored best among all responsive Bids</p><p><em>X</em>&nbsp;&nbsp;&nbsp;&nbsp; =&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; weight for Cost as <strong>specified in the BDS</strong></p><p>The Bid with the best evaluated Bid Score (B) among responsive Bids shall be the Most Advantageous Bid provided the Bidder is qualified to perform the Contract.</p><p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>2. Qualification </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:145px\"><p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:690px\"><p><strong>1 Eligibility</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:145px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:570px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:120px\"><p><strong>Documentation Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:188px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:382px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:290px\"><p><strong>Joint Venture</strong>(existing or intended)</p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:98px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:91px\"><p><strong>Each Partner</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; width:101px\"><p><strong>At least one Partner</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.1 Nationality</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Nationality in accordance with ITB 4.4.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Form ELI &ndash;1.1 and 1.2, with attachments</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.2 Conflict of Interest</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>No- conflicts of interests as described in ITB 4.2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.3 Bank Ineligibility</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Not having been declared ineligible by the Bank as described in 4.5.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.4 State Owned Enterprise or Institution</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Compliance with conditions of ITB 4.6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:98px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Form ELI&nbsp; &ndash;1.1 and 1.2, with attachments</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:145px\"><p>1.5 Ineligibility based on a United Nations resolution or Borrower&rsquo;s country law</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:188px\"><p>Not having been excluded as a result of the Borrower&rsquo;s country laws or official regulations, or by an act of compliance with UN Security Council resolution, in accordance with ITB 4.8and Section V.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:98px\"><p>must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:101px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>Letter of Bid</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:148px\"><br /><br />&nbsp;<p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:700px\"><p><strong>2. Historical Contract Non-Performance</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:148px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:576px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:124px\"><p><strong>Documentation&nbsp; Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:186px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:390px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:104px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:286px\"><p><strong>Joint Venture (existing or intended)</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p><strong>At least one member</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.1 History of non-performing contracts</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Non-performance[1]of a contract did not occur within the last <strong>5</strong> years prior to the deadline for application submission, based on all information on fully settled disputes or litigation.&nbsp; A fully settled dispute or litigation is one that has been resolved in accordance with the Dispute Resolution Mechanism under the respective contract, and where all appeal instances available to the Bidder have been exhausted.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement by itself or as member to past or existing JV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement[2]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON - 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.2 Suspension</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>&nbsp;Not under suspension based on execution of a Bid Securing Declaration or Proposal Securing Declaration pursuant to ITB 4.7 and ITB 20.9</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Letter of Bid</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.3 Pending Litigation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Bid&rsquo;s financial position and prospective long term profitability still sound according to criteria established in 3.1 below and assuming that all pending litigation will be resolved against the Bidder</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON &ndash; 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p>2.4 Litigation History</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>No consistent history of court/arbitral&nbsp; award decisions against the Bidder[3]since 1st January <em>2021</em></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON &ndash; 2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.5 Declaration: Environmental and Social (ES) past performance</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>Declare any contract that has been suspended or terminated and/or performance security called by an employer for reasons of breach of environmental, or social (including Sexual Exploitation, and Abuse) contractual obligations in the past five years.[4]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must make the declaration. Where there are Specialized Subcontractor/s, the Specialized Subcontractor/s must also make the declaration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Each must make the declaration. Where there are Specialized Subcontractor/s, the Specialized Subcontractor/s must also make the declaration.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Form CON-3 ES Performance Declaration</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:148px\"><p><strong>2.6 Bank&rsquo;s SEA and/or SH Disqualification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:186px\"><p>At the time of Contract Award, not subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement</p><p>(including each subcontractor proposed by the Bidder)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:88px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:104px\"><p>Must meet requirement (including each subcontractor proposed by the Bidder)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:94px\"><p>N/A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:40px; vertical-align:top; width:124px\"><p>Letter of Bid, Form CON-4</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><thead><tr><td colspan=\"2\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:146px\"><p><strong>Factor</strong></p></td><td colspan=\"6\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:700px\"><p><strong>3 Financial Situation</strong></p></td></tr><tr><td colspan=\"2\" rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:146px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:574px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:126px\"><p><strong>Documentation Required</strong></p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:186px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:388px\"><p><strong>Bidder</strong></p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:100px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p><strong>Joint Venture (existing or intended)</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; width:96px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:99px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:38px; width:94px\"><p><strong>At least one member</strong></p></td></tr></thead><tbody><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:146px\"><p>3.1 Financial Capabilities</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:186px\"><p>Submission of audited balance sheets or if not required by the law of the Bidder&rsquo;s Country, other financial statements acceptable to the Employer, for the last <strong>three [3]</strong> years to demonstrate the current soundness of the Bidders financial position and its prospective long-term profitability.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:99px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:94px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:191px; vertical-align:top; width:126px\"><p>Form FIN &ndash; 3.1 with attachments</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:146px\"><p>3.2 Average Annual Turnover</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:186px\"><p>Minimum average annual construction turnover in supply and installation of electricity distribution infrastructure of <strong>US$ 1,720,000.00 (One million, seven hundred and twenty thousand)</strong>, calculated as total certified payments received for contracts in progress and/or completed within the last three (3) years,</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:99px\"><p>Must meet <strong>at least 30 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:94px\"><p>Must meet <strong>at</strong> <strong>least 70 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; vertical-align:top; width:126px\"><p>Form FIN &ndash;3.2</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:144px\"><p>3.3 Financial Resources</p><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:188px\"><p>The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet:</p><p>(i) the following cash-flow requirement:</p><p><strong>USD $ 430,000.00 (four hundred and thirty thousand)</strong></p><p>and</p><p>(ii) the overall cash flow requirements for this contract and its current commitments.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:100px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:99px\"><p>Must meet <strong>at least 30 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:94px\"><p>Must meet <strong>at</strong> <strong>least 70 %</strong> of the requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:219px; vertical-align:top; width:126px\"><p>Form FIN &ndash;3.3</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:78px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:128px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:81px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:79px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:123px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:876px\"><thead><tr><td style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:133px\"><p><strong>Factor</strong></p></td><td colspan=\"7\" style=\"background-color:#7f7f7f; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:743px\"><p><strong>4 Experience</strong></p></td></tr><tr><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:133px\"><p><strong>Sub-Factor</strong></p></td><td colspan=\"5\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:628px\"><p><strong>Criteria</strong></p></td><td rowspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:114px\"><p><strong>Documentation Required</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:198px\"><p><strong>Requirement</strong></p></td><td colspan=\"4\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:430px\"><p><strong>Bidder</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:96px\"><p><strong>Single Entity</strong></p></td><td colspan=\"3\" style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:334px\"><p><strong>Joint Venture (existing or intended)</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p><strong>All members combined</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p><strong>Each member</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><strong>At least one member</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.1 General Experience</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Experience in supply, installation and commissioning of electricity<em> distribution control systems</em> under contracts in the role of main <em>contractor</em>, JV member, subcontractor, or management contractor for at least the last <strong><em>five (5</em></strong><em>) </em>years starting 1st January <em>2021</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP-4.1</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2(a) Specific Experience</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>(a)Participation as contractor, joint venture member[5], management contractor, or subcontractor, in at least two (2) contracts within the last eight (8) years (from 1 January 2018), each with a value of at least<strong> $860,000.00 </strong>that have been successfully and substantially[6]completed and that are similar to the proposed Plant and Installation Services.</p><p>The similarity of the contracts shall be based on the physical size, complexity, methods, technology or other characteristics as described in Section VII, Employer&rsquo;s Requirements.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirement</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements[7]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>Must meet the following requirements for the key activities listed below</p><ul><li>2 contracts for Supply, Installation and commissioning of 11 to 33 kV auto-reclosers/circuit breakers in Sub-Sahara countries.</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP 4.2(a)</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2(b)&nbsp; Specific Experience </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>(b) For the above or other contracts executed during the period stipulated in 4.2(a) above, a minimum experience in the following key activities:</p><ul><li>Design, Supply, Installation, and Commissioning of at least two [2] of 11 to 33 kV auto-reclosers/circuit breakers within the last five [5] years; and</li><li>&nbsp;At least one of the contracts shall have the complete scope of installation/integration to SCADA in a Sub-Sahara Africa</li></ul><p>Bidders should submit details of previous projects and reference letters from clients in support of the projects they are using to demonstrate their qualifications.</p><p>The Employer may make independent inquiries about any or all of the projects referenced by bidders and may visit and examine the projects used by Bidders in support of their qualifications.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements[8]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N / A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>Must meet the requirements</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP-4.2(b)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:133px\"><p><strong>4.2 (c) Specific Experience in managing ES aspects </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>For the contracts in 4.2 (a) above and/or any other contracts [substantially completed and under implementation] as prime contractor, joint venture member, or Subcontractor between 1st January <em>2021</em> and Application submission deadline, experience in managing ES risks and impacts in the following aspects:</p><ul><li>Health and Safety on project areas and working areas</li><li>ESHS training of Contractor &amp; local partners and staff; including induction training, health screening, training in correct use of PPEs, Project ESHS risks and hazards;</li><li>Waste management</li><li>Emergency Management</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:108px\"><p>Must meet requirements</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p>N/A</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p>N/A</p><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Form EXP &ndash; 4.2 (c)</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:0px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:73px; width:613px\"><p><strong>Section IV - Bidding Forms</strong></p></td></tr></tbody></table><p><strong>Table of Forms</strong></p><p>&nbsp;</p><p><strong>Letter of Bid- Technical Part 79</strong></p><p><strong>Technical Proposal 82</strong></p><p>Site Organization. 83</p><p>Method Statement 84</p><p>Mobilization Schedule. 85</p><p>Construction Schedule. 86</p><p>ES Management Strategies and Implementation Plans (ES-MSIP) 87</p><p>Sustainable Procurement Proposal 88</p><p>Risk assessment and Proposed Management Plan. 89</p><p>Code of Conduct for Contractor&rsquo;s Personnel (ES) Form.. 90</p><p>Plant 94</p><p><strong>Contractor&rsquo;s Equipment 95</strong></p><p><strong>Functional Guarantees. 96</strong></p><p><strong>Personnel 97</strong></p><p>Resume of Proposed Personnel 99</p><p><strong>Proposed Subcontractors for Major Items of Plant and Installation Services. 100</strong></p><p><strong>Others - Time Schedule. 101</strong></p><p><strong>Bidders Qualification without prequalification. 115</strong></p><p><strong>Bidder Information Sheet 116</strong></p><p><strong>Party to JV Information Sheet 117</strong></p><p><strong>Historical Contract Non-Performance, Pending Litigation and Litigation History. 118</strong></p><p><strong>Current Contract Commitments / Works in Progress. 124</strong></p><p><strong>Financial Situation. 125</strong></p><p>Historical Financial Performance. 125</p><p>Average Annual Turnover 127</p><p>Financial Resources. 128</p><p><strong>Experience. 129</strong></p><p>General Experience. 129</p><p>Specific Experience. 131</p><p>Specific Experience in Key Activities. 133</p><p><strong>Form of Bid Security. 136</strong></p><p>Form of Bid Security &ndash; Bank Guarantee. 136</p><p>Form of Bid Security- Bid Bond. 138</p><p>Form of Bid-Securing Declaration. 139</p><p><strong>Manufacturer&rsquo;s Authorization. 140</strong></p><p><strong>Schedule of Rates and Prices. 143</strong></p><p>Schedule No. 1.&nbsp; Plant and Mandatory Spare Parts Supplied from Abroad. 143</p><p>Country of Origin Declaration Form.. 144</p><p>Schedule No. 2.&nbsp; Plant and Mandatory Spare Parts Supplied from Within the Employer&rsquo;s Country. 145</p><p>Schedule No. 3.&nbsp; Design Services. 146</p><p>Schedule No. 4.&nbsp; Installation and Other Services. 147</p><p>Schedule No. 5.&nbsp; Grand Summary. 148</p><p>Schedule No. 6.&nbsp; Recommended Spare Parts. 149</p><p><strong>Price Adjustment 150</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Letter of Bid- Technical Part</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:599px\"><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENT</em></p><p><em>The Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder&rsquo;s complete name and business address.</em></p><p><em><u>Note</u></em><em>: All italicized text is to help Bidders in preparing this form.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Date of this Bid submission</strong>: [<em>insert date (as day, month and year) of Bid submission</em>]</p><p><strong>RFB No.:</strong> [<em>insert number of RFB process</em>]</p><p><strong>Alternative No.</strong>:[<em>insert identification No if this is a Bid for an alternative</em>]</p><p>We, the undersigned, hereby submit our Bid, in two parts, namely:</p><ol><li>the Technical Part, and</li><li>the Financial Part</li></ol><p>In submitting our Bid, we make the following declarations:</p><ol><li><strong>No reservations:</strong> We have examined and have no reservations to the bidding document, including Addenda issued in accordance with Instructions to Bidders (ITB 8);</li><li><strong>Eligibility</strong>: We meet the eligibility requirements and have no conflict of interest in accordance with ITB 4;</li><li><strong>Bid-Securing Declaration:</strong> We have not been suspended nor declared ineligible by the Employer based on execution of a Bid-Securing Declaration or Proposal-Securing Declaration in the Employer&rsquo;s country in accordance with ITB 4.7;</li><li><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH):</strong> [<em>select the appropriate option from (i) to (v) below and delete the others</em>].</li></ol><p>We <em>[where JV, insert: </em>&ldquo;including any of our JV members&rdquo;<em>]</em>, and any of our subcontractors:</p><ol><li>[have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]</li><li>[are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations for a period of two years. We have subsequently provided and demonstrated that we have adequate capacity and commitment to comply with SEA and SH prevention and response obligations.]</li><li>[had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations for a period of two years. We have attached documents demonstrating that we have adequate capacity and commitment to comply with SEA and SH prevention and response obligations.]</li></ol><ol><li><strong>Conformity</strong>: We offer to provide design, supply and installation services in conformity with the bidding document of the following: [<em>insert a brief description of the Plant, Design, Supply and Installation Services</em>]<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>;</li><li><strong>Bid Validity</strong>: Our Bid shall be valid until <em>[insert day, month and year in accordance with ITB 19.1]</em>, and it shall remain binding upon us and may be accepted at any time on or before this date;</li><li><strong>Performance Security:</strong> If our Bid is accepted, we commit to obtain a Performance Security in accordance with the bidding document;</li><li><strong>One Bid Per Bidder: </strong>We are not submitting any other Bid(s) as an individual Bidder, and we<em> </em>are not participating in any other Bid(s) as a Joint Venture member, and meet the requirements of ITB 4.3, other than alternative Bids submitted in accordance with ITB 13;</li><li><strong>Suspension and Debarment</strong>: We, along with any of our subcontractors, suppliers, consultants, manufacturers, or service providers for any part of the contract, are not subject to, and not controlled by any entity or individual that is subject to, a temporary suspension or a debarment imposed by the World Bank Group or a debarment imposed by the World Bank Group in accordance with the Agreement for Mutual Enforcement of Debarment Decisions between the World Bank and other development banks. Further, we are not ineligible under the Employer&rsquo;s country laws or official regulations or pursuant to a decision of the United Nations Security Council;</li><li><strong>State-owned enterprise or institution:</strong> [<em>select the appropriate option and delete the other</em>] [<em>We are not a state-owned enterprise or institution</em>] / [<em>We are a state-owned enterprise or institution but meet the requirements of ITB 4.6</em>];</li><li><strong>Binding Contract</strong>: We understand that this Bid, together with your written acceptance thereof included in your Letter of Acceptance, shall constitute a binding contract between us, until a formal contract is prepared and executed;</li><li><strong>Not Bound to Accept:</strong> We understand that you are not bound to accept the lowest evaluated cost Bid, the Most Advantageous Bid or any other Bid that you may receive; and</li><li><strong>Fraud and Corruption:</strong> We hereby certify that we have taken steps to ensure that no person acting for us or on our behalf engages in any type of Fraud and Corruption.</li></ol><p>;</p><p><strong>Name of the Bidder</strong>: *[<em>insert complete name of the Bidder</em>]</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: **[<em>insert complete name of person duly authorized to sign the Bid</em>]</p><p><strong>Title of the person signing the Bid</strong>: [<em>insert complete title of the person signing the Bid</em>]</p><p><strong>Signature of the person named above</strong>: [<em>insert signature of person whose name and capacity are shown above</em>]</p><p><strong>Date signed</strong> [<em>insert date of signing</em>] <strong>day of</strong> [<em>insert month</em>], [<em>insert year</em>]</p><p><strong>*</strong>: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder</p><p>**: Person signing the Bid shall have the power of attorney given by the Bidder to be attached with the Bid</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Technical Proposal</strong></p></td></tr></tbody></table><p>&nbsp;</p><ul><li>Site Organization</li><li>Method Statement</li><li>Mobilization Schedule</li><li>Construction Schedule</li><li>ES Management Strategies and Implementation Plans</li><li>Sustainable Procurement Proposal</li><li>Risk Assessment and Proposed Management Plan</li><li>Code of Conduct for Contractor&rsquo;s Personnel (ES)</li><li>Plant</li><li>Contractor&rsquo;s Equipment</li><li>Personnel</li><li>Proposed Subcontractors for Major Items of Plant and Installation Services</li><li>Others</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Site Organization</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Method Statement</strong></p><p><em>[<strong>Note to the Bidder</strong>: (i) As required in BDS 11.2 (i), also include method statement, management strategies, implementation plans and innovations; (ii) if there are assessed supply chain risks, the method statement must include proposed supply chain risks management plans.]</em></p><p>In addition, the Bidder/Contractor shall establish, implement and maintain a Method Statement for its specific Occupational Health &amp; Safety (OHS) risks on site and describe mitigation measures to keep high risks under control. Method Statement is a type of health and safety document that Contractor shall use for high-risk work. It describes the steps (method) that workers must take to carry out a particular job safely. Primarily, they are for the benefit of those who will physically be carrying out the work, usually those working in the construction sector.</p><p>The document shall identify the potential hazards that may arise during a particular task and outline the necessary precautions that must be put in place and taken by workers. The statement must be as simple as possible to avoid any misinterpretations that could result in injury. Workers involved in the work shall read it, understand what is expected of them and follow the measures that are in place to keep them safe. Method Statement shall be approved by the Employer.</p><p>The Bidder/Contractor shall describe the method of work to keeping under control high risks and establish a permit to work system and issue a permit to work (PTW) for specific work. PTW shall be issued, but is not limited to, working at height, working in confined spaces, lone work, asbestos, hot work and the use of dangerous plant. Method Statements shall contain the following items but not limited to:</p><ul><li>Equipment, installation and machinery used;</li><li>Responsibilities (workforce) for carrying out the work;</li><li>Responsibility of Contractor&rsquo;s supervisor;</li><li>Identified specific hazards and risks and risk control;</li><li>Use of Personal Protective Equipment (PPE) on construction site;</li><li>Safety audit (before starting the job to check if comply with);</li><li>Workforce competence (name, surname and number of training certificate, etc.);</li><li>Subcontractors (if applicable);</li><li>Toolbox meeting and training (risks communication);</li><li>ES aspects and measures to mitigate E&amp;S impacts and risks;</li><li>Emergency arrangements and equipment needs;</li><li>Permit to Work;</li><li>Other specific issues which can appear in the process of work, etc.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Mobilization Schedule</strong></p><p><strong>[Insert Technical Proposal for Mobilization Schedule]</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Construction Schedule</strong></p><p>The Bidder should chalk out proper mobilisation schedule and construction schedule along with the CPM/ PERT charts for execution of the Contract as a whole. Since no extension of time is anticipated unless exclusively warranted under critical circumstances, work programme for all key activities that may have bearing on project implementation should be clearly shown within the overall project schedule. For example, time required for import of equipment and construction materials together with time schedule within the overall schedule for preconstruction activities like surveys and investigations and preparation of construction drawings.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ES Management Strategies and Implementation Plans (ES-MSIP)</strong></p><p>The Bidder shall submit comprehensive and concise Environmental and Social Management Strategies and Implementation Plans (ES-MSIP) as required by ITB 11.1 (j) of the Bid Data Sheet. These strategies and plans shall describe in detail the actions, materials, equipment, management processes etc. that will be implemented by the Contractor, and its subcontractors.</p><p>In developing these strategies and plans, the Bidder shall have regard to the ES provisions of the contract including those as may be more fully described in the Employer&rsquo;s Requirements in Section VII.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Sustainable Procurement Proposal</strong></p><p><strong><em>Note to Bidder</em></strong><em>: In addition to submitting the <strong>required</strong> </em>ES Management Strategies and Implementation Plans, <em>the Bidder shall provide its proposal to demonstrate how additional sustainable procurement requirements, if any, specified in Section VII- Employer&rsquo;s Requirements would be addressed. The Bidder shall also provide its proposal, if any, for exceeding the sustainable procurement requirements. </em></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Risk assessment and Proposed Management Plan </strong></p><p>The Bidder should submit a risk register identifying the hazards anticipated during the implementation of the contract.</p><p>For the key hazards ranked by impact, the risk register shall include a description of the hazard, an assessment of the potential impact on health and safety, environment, cost, program or other, and the proposed mitigation strategy for each hazard.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><strong>Note to the Bidder</strong>:</p><p><strong>The minimum content of the Code of Conduct form as set out by the Employer shall not be substantially modified</strong>. However, the Bidder may add requirements as appropriate, including to take into account Contract-specific issues/risks.&nbsp;</p><p>The Bidder shall initial and submit the Code of Conduct form as part of its bid.</p><p>&nbsp;</p></td></tr></tbody></table><p>Code of Conduct for Contractor&rsquo;s Personnel (ES) Form</p><table style=\"width:100%\"><tbody><tr><td><p><strong><em>Note to the Employer</em></strong><em>: </em></p><p><strong><em>The following minimum requirements shall not be modified</em></strong><em>. The Employer may add additional requirements to address identified issues, informed by relevant environmental and social assessment.</em></p><p><em>The types of issues identified could include risks associated with: labour influx, spread of communicable diseases, and </em>Sexual Exploitation and Abuse (SEA), Sexual Harassment (SH)<em> etc. </em></p><p><strong><em>Delete this Box prior to issuance of the bidding documents.</em></strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>We are the Contractor, [<em>enter name of Contractor</em>].&nbsp; We have signed a contract with [<em>enter name of Employer</em>] for [<em>enter description of the Facilities</em>]. The Plant for the Facilities will be installed at [<em>enter the Site]</em>. Our contract requires us to implement measures to address environmental and social risks, related to the Installation Services i.e. services ancillary to the supply of the Plant for the Facilities, such as inland transportation, site preparation works/ associated civil works, installation, testing, precommissioning, commissioning, operations and maintenance etc. as the case may require.</p><p>This Code of Conduct is part of our measures to deal with environmental and social risks related to the Installation Services.&nbsp;</p><p>All personnel that we utilize in the execution of the Contract, including staff, labor and other employees of us and of each Subcontractor, and any other personnel assisting us in the execution of the Contract, are referred to as Contractor&rsquo;s Personnel.</p><p>This Code of Conduct identifies the behavior that we require from the Contractor&rsquo;s Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located).</p><p>Our workplace is an environment where unsafe, offensive, abusive or violent behavior will not be tolerated and where all persons should feel comfortable raising issues or concerns without fear of retaliation.</p><p><strong>REQUIRED CONDUCT</strong></p><p>Contractor&rsquo;s&nbsp; Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located) shall:</p><ol><li>carry out his/her duties competently and diligently;</li><li>comply with this Code of Conduct and all applicable laws, regulations and other requirements, including requirements to protect the health, safety and well-being of other Contractor&rsquo;s Personnel and any other person;</li><li>maintain a safe working environment including by:<ol><li>ensuring that workplaces, machinery, equipment and processes under each person&rsquo;s control are safe and without risk to health;</li><li>wearing required personal protective equipment; &nbsp;&nbsp;</li><li>using appropriate measures relating to chemical, physical and biological substances and agents; and</li><li>following applicable emergency operating procedures.</li></ol></li><li>report work situations that he/she believes are not safe or healthy and remove himself/herself from a work situation which he/she reasonably believes presents an imminent and serious danger to his/her life or health;</li><li>treat other people with respect, and not discriminate against specific groups such as women, people with disabilities, migrant workers or children;</li><li>not engage in any form of sexual harassment including unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature with other Contractor&rsquo;s or Employer&rsquo;s Personnel;</li><li>not engage in Sexual Exploitation, which means any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another;</li><li>not engage in in Sexual Abuse,&nbsp; which means the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions;</li><li>not engage in any form of sexual activity with individuals under the age of 18, except in case of pre-existing marriage;</li><li>complete relevant training courses that will be provided related to the environmental and social aspects of the Contract, including on health and safety matters, and Sexual Exploitation and Abuse, and Sexual Harassment (SH);</li><li>&nbsp;report violations of this Code of Conduct; and</li><li>not retaliate against any person who reports violations of this Code of Conduct, whether to us or the Employer, or who makes use of the grievance mechanism for Contractor&rsquo;s Personnel or the project&rsquo;s Grievance Redress Mechanism.</li></ol><p><strong>RAISING CONCERNS </strong></p><p>If any person observes behavior that he/she believes may represent a violation of this Code of Conduct, or that otherwise concerns him/her, he/she should raise the issue promptly. This can be done in either of the following ways:</p><ol><li>Contact [<em>enter name of the Contractor&rsquo;s Social Expert with relevant experience in handling sexual exploitation, sexual abuse and sexual harassment cases, or if such person is not required under the Contract, another individual designated by the Contractor to handle these matters</em>] in writing at this address [&nbsp;&nbsp; ] or by telephone at [&nbsp;&nbsp; ] or in person at [&nbsp;&nbsp; ]; or</li><li>Call [&nbsp; ]&nbsp; to reach the Contractor&rsquo;s hotline <em>(if any)</em> and leave a message.</li></ol><p>&nbsp;</p><p>The person&rsquo;s identity will be kept confidential, unless reporting of allegations is mandated by the country law. Anonymous complaints or allegations may also be submitted and will be given all due and appropriate consideration. We take seriously all reports of possible misconduct and will investigate and take appropriate action. We will provide warm referrals to service providers that may help support the person who experienced the alleged incident, as appropriate.</p><p>There will be no retaliation against any person who raises a concern in good faith about any behavior prohibited by this Code of Conduct.&nbsp; Such retaliation would be a violation of this Code of Conduct.&nbsp;</p><p><strong>CONSEQUENCES OF VIOLATING THE CODE OF CONDUCT</strong></p><p>Any violation of this Code of Conduct by the Contractor&rsquo;s Personnel may result in serious consequences, up to and including termination and possible referral to legal authorities.</p><p>FOR CONTRACTOR&rsquo;s PERSONNEL:</p><p>I have received a copy of this Code of Conduct written in a language that I comprehend.&nbsp; I understand that if I have any questions about this Code of Conduct, I can contact [<em>enter name of Contractor&rsquo;s contact person(s) with relevant experience</em>] requesting an explanation.&nbsp;</p><p>Name of Contractor&rsquo;s Personnel: [insert name]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Signature: __________________________________________________________</p><p>Date: (day month year): _______________________________________________</p><p>Countersignature of authorized representative of the Contractor:</p><p>Signature: ________________________________________________________</p><p>Date: (day month year): ______________________________________________</p><p><strong>ATTACHMENT 1: </strong>Behaviors constituting SEA and behaviors constituting SH</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ATTACHMENT 1 TO THE CODE OF CONDUCT FORM</strong></p><p>&nbsp;</p><p><strong>BEHAVIORS CONSTITUTING SEXUAL EXPLOITATION AND ABUSE (SEA) AND BEHAVIORS CONSTITUTING SEXUAL HARASSMENT (SH)</strong></p><p>&nbsp;</p><p>The following non-exhaustive list is intended to illustrate types of prohibited behaviors.</p><ol><li><strong>Examples of sexual exploitation and abuse</strong> include, but are not limited to:</li></ol><ul><li>A Contractor&rsquo;s Personnel tells a member of the community that he/she can get them jobs related to the work site (e.g., cooking and cleaning) in exchange for sex.</li><li>A Contractor&rsquo;s Personnel that is connecting electricity input to households says that he can connect women headed households to the grid in exchange for sex.</li><li>A Contractor&rsquo;s Personnel rapes, or otherwise sexually assaults a member of the community.</li><li>A Contractor&rsquo;s Personnel denies a person access to the Site unless he/she performs a sexual favor.&nbsp;</li><li>A Contractor&rsquo;s Personnel tells a person applying for employment under the Contract that he/she will only hire him/her if he/she has sex with him/her.</li></ul><p>&nbsp;</p><ol><li><strong>Examples of sexual harassment</strong> <strong>in a work context</strong></li></ol><ul><li>A Contractor&rsquo;s Personnel comment on the appearance of another Installation Services Personnel (either positive or negative) and sexual desirability.</li><li>When a Contractor&rsquo;s Personnel complains about comments made by another Contractor&rsquo;s Personnel on his/her appearance, the other Contractor&rsquo;s Personnel comment that he/she is &ldquo;asking for it&rdquo; because of how he/she dresses.</li><li>Unwelcome touching of a Contractor&rsquo;s Personnel or Employer&rsquo;s Personnel by another Contractor&rsquo;s Personnel.</li><li>A Contractor&rsquo;s Personnel tells another Contractor&rsquo;s Personnel that he/she will get him/her a salary raise, or promotion if he/she sends him/her naked photographs of himself/herself.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Plant</strong></p><p>&nbsp;</p><p><strong>Contractor&rsquo;s Equipment</strong></p><p>Form EQU</p><p>The Bidder shall provide adequate information to demonstrate clearly that it has the capability to meet the requirements for the key Contractor&rsquo;s equipment listed in Section III, Evaluation and Qualification Criteria. A separate Form shall be prepared for each item of equipment listed, or for alternative equipment proposed by the Bidder.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p>Item of equipment</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>Equipment information</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:264px\"><p>Name of manufacturer</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Model and power rating</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Capacity</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Year of manufacture</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Current status</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Current location</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Details of current commitments</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Source</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Indicate source of the equipment</p><p>&nbsp;&nbsp;&nbsp;&nbsp; o Owned&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Rented&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Leased&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; o Specially manufactured</p></td></tr></tbody></table><p>&nbsp;</p><p>Omit the following information for equipment owned by the Bidder.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Owner</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Name of owner</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Address of owner</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Telephone</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Contact name and title</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p>Fax</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p>Telex</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p>Agreements</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p>Details of rental / lease / manufacture agreements specific to the project</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:510px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Functional Guarantees</strong></p><p>Form FUNC</p><p>&nbsp;</p><p>The Bidder shall copy in the left column of the table below, the identification of each functional guarantee required in the Specification and stated by the Employer in para. 1.2 (c) of Section III, Evaluation and Qualification Criteria, and in the right column, provide the corresponding value for each functional guarantee of the proposed plant and equipment.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:619px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:307px\"><p><strong>Required Functional Guarantee </strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:312px\"><p><strong>Value of Functional Guarantee of the Proposed Plant and Equipment</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>1.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>2.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>3.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:307px\"><p>&hellip;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Personnel</strong></p></td></tr></tbody></table><p><strong>Form PER -1</strong></p><p><strong>Contractor&rsquo;s Representative and other Key Personnel </strong></p><p><strong>Schedule </strong></p><p>Bidders should provide the names of suitably qualified personnel to meet the specified requirements stated in Section VII. The data on their experience should be supplied using the Form below for each candidate.</p><p><em>*As listed in Section III, Evaluation and Qualification Criteria.</em></p><p><strong>Contractor&rsquo; Representative and Key Personnel </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; height:22px; vertical-align:top; width:48px\"><ol><li><strong>1.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:558px\"><p><strong>Title of position: </strong>Contractor&rsquo;s Representative</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate: </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>2.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Environmental Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>3.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Health and Safety Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li><strong>4.</strong></li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: [Social Specialist]</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate:&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><ol><li>&nbsp;</li></ol></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Title of position: </strong><strong>Sexual Exploitation, Abuse and Harassment Expert</strong></p><p><em>&nbsp;[Where a Project SEA risks are assessed to be substantial or high, key personnel shall include an expert/s with relevant experience in addressing sexual exploitation, sexual abuse and sexual harassment&nbsp; cases]</em></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:558px\"><p><strong>Name of candidate</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Duration of appointment:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the whole period (start and end dates) for which this position will be engaged</em>]</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Time commitment: for this position:</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the number of days/week/months/ that has been scheduled for this position</em>]</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\"><p><strong>Expected time schedule for this position:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:431px\"><p>[<em>insert the expected time schedule for this position (e.g., attach high level Gantt chart</em>]</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:48px\"><p><strong>7.</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:558px\"><p><strong>Title of position: [insert title]</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Form PER-2</p><p>&nbsp;</p><p><strong>Resume of Proposed Personnel&nbsp; </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p><strong>Name of Bidder</strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:606px\"><p><strong>Position</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p><strong>Personnel information</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Name </strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Date of birth</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Professional qualifications</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:96px\"><p><strong>Present employment</strong></p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Name of employer</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:510px\"><p><strong>Address of employer</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Telephone</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Contact (manager / personnel officer)</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Fax</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>E-mail</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:264px\"><p><strong>Job title</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Years with present employer</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>Summarize professional experience over the last 20 years, in reverse chronological order. Indicate particular technical and managerial experience relevant to the project.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p><strong>From</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p><strong>To</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p><strong>Company / Project / Position / Relevant technical and management experience</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px dotted black; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px dotted black; border-left:1px solid black; border-right:none; border-top:1px dotted black; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:dotted; border-left:solid; border-right:solid; border-top:dotted; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Proposed Subcontractors for Major Items of Plant and Installation Services</strong></p><p>&nbsp;</p><p>A list of major items of <u>Plant and Installation Services is provided below.</u></p><p>&nbsp;</p><p>The following Subcontractors and/or manufacturers are proposed for carrying out the item of the facilities indicated.&nbsp; Bidders are free to propose more than one for each item</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:199px\"><p><strong>Major Items of Plant and Installation Services</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:288px\"><p><strong>Proposed Subcontractors/Manufacturers</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:113px\"><p><strong>Nationality</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>11kV auto reclosers supply</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Telecommunications equipment (data radios and antennas)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Overhead line construction</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:199px\"><p>Protection and SCADA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:288px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:113px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Others - Time Schedule</strong></p><p>(to be used by Bidder when alternative Time for <strong>Completion is invited in ITB 13.2)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Bidders Qualification without prequalification</strong></p><p><strong>To establish its qualifications to perform the contract in accordance with Section III, Evaluation and Qualification Criteria the Bidder shall provide the information requested in the corresponding Information Sheets included hereunder. </strong></p><p>&nbsp;</p><p><strong>Form ELI 1.1</strong></p><p><strong>Bidder Information Sheet</strong></p><p>Date:&nbsp; ______________________</p><p>RFB No.: ___________________</p><p>Page ________ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:612px\"><p>1.&nbsp; Bidder&rsquo;s Legal Name</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:45px; vertical-align:top; width:612px\"><p>2.&nbsp; In case of JV, legal name of each party:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:612px\"><p>3.&nbsp; Bidder&rsquo;s actual or intended Country of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:612px\"><p>4.&nbsp; Bidder&rsquo;s Year of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>5.&nbsp; Bidder&rsquo;s Legal Address in Country of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>6.&nbsp; Bidder&rsquo;s Authorized Representative Information</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Name:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Address:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Telephone/Fax numbers:</p><p>&nbsp;&nbsp;&nbsp;&nbsp; Email Address:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:612px\"><p>7. Attached are copies of original documents of</p><p>&nbsp;&nbsp;&nbsp; Articles of Incorporation (or equivalent documents of constitution or association), and/or documents of registration of the legal entity named above, in accordance with ITB 4.4</p><p>&nbsp;&nbsp;&nbsp; In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1</p><p>&nbsp;&nbsp;&nbsp; In case of state-owned enterprise or institution, in accordance with ITB 4.6, documents establishing:</p><ul><li>Legal and financial autonomy</li><li>Operation under commercial law</li><li>Establishing that the Bidder is not under the supervision of the Employer</li></ul><p>8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder shall provide additional information on beneficial ownership, using the Beneficial Ownership Disclosure Form.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form ELI 1.2</strong></p><p><strong>Party to JV Information Sheet</strong></p><p>Date: ______________________</p><p>RFB No.: ___________________</p><p>Page ________ of_ ______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:606px\"><p>1.&nbsp; Bidder&rsquo;s Legal Name:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:45px; vertical-align:top; width:606px\"><p>2.&nbsp; JV&rsquo;s Party legal name:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:606px\"><p>3.&nbsp; JV&rsquo;s Party Country of Registration:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>4. JV&rsquo;s Party Year of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>5.&nbsp; JV&rsquo;s Party Legal Address in Country of Registration:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>6.&nbsp; JV&rsquo;s Party Authorized Representative Information</p><p>Name:</p><p>Address:</p><p>Telephone/Fax numbers:</p><p>Email Address:</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:606px\"><p>7. Attached are copies of original documents of</p><p>&nbsp;&nbsp;&nbsp; Articles of Incorporation (or equivalent documents of constitution or association), and/or registration documents of the legal entity named above, in accordance with ITB 4.4.</p><p> &nbsp;&nbsp; In case of a state-owned enterprise or institution, documents establishing legal and financial autonomy, operation in accordance with commercial law, and that they are not under the supervision of the Employer, in accordance with ITB 4.6.</p><p>8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder shall provide additional information on beneficial ownership for each JV member using the Beneficial Ownership Disclosure Form.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 2</strong></p><p><strong>Historical Contract Non-Performance, Pending Litigation and Litigation History</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; _______________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name:&nbsp; _______________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp; ___________________</p><p>RFB No.:&nbsp; __________________</p><p>Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p>Non-Performed Contracts in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>&nbsp;&nbsp;&nbsp; Contract non-performance did not occur since 1st January <em>[insert year] </em>specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.1.</p><p>&nbsp;&nbsp;&nbsp; Contract(s) not performed since 1st January <em>[insert year]</em> specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.1</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><strong>Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Non- performed portion of contract</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><strong>Contract Identification</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:118px\"><p><strong>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for nonperformance: <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:118px\"><p><em>[insert amount]</em></p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>Pending Litigation, in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p> &nbsp;&nbsp; No pending litigation in accordance with Sub-Factor 2.3.</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p> &nbsp;&nbsp; Pending litigation in accordance with Sub-Factor 2.3 as indicated below.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:102px\"><p><strong>Year of dispute</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:137px\"><p><strong>Amount in dispute (currency)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:265px\"><p><strong>Contract Identification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:112px\"><p><strong>Total Contract Amount (currency), USD Equivalent (exchange rate)</strong></p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:137px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:265px\"><p>Contract Identification: _________</p><p>Name of Employer: ____________</p><p>Address of Employer: __________</p><p>Matter in dispute: ______________</p><p>Party who initiated the dispute: ____</p><p>Status of dispute: <em>___________</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:137px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:265px\"><p>Contract Identification:</p><p>Name of Employer:</p><p>Address of Employer:</p><p>Matter in dispute:</p><p>Party who initiated the dispute:</p><p>Status of dispute:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:616px\"><p>Litigation History in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:616px\"><p> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No Litigation History in accordance with Sub-Factor 2.4.</p><p> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Litigation History in accordance with Sub-Factor 2.4 as indicated below.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p><strong>Year of award</strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>Outcome as percentage of Net Worth </strong></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p><strong>Contract Identification</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Total Contract Amount (currency), USD Equivalent (exchange rate)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p><em>[insert year]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><em>[insert percentage]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>Contract Identification: [indicate complete contract name, number, and any other identification]</p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Matter in dispute: <em>[indicate main issues in dispute]</em></p><p>Party who initiated the dispute: <em>[indicate &ldquo;Employer&rdquo; or &ldquo;Contractor&rdquo;]</em></p><p>Reason(s) for Litigation and award decision <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:78px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:13px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:111px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:13px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:225px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:106px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 3</strong></p><p><strong>Environmental and Social Performance Declaration </strong></p><p><em>[</em><em>The following table shall be filled in for the Bidder, each member of a Joint Venture and each Specialized Subcontractor]</em></p><p>Bidder&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Joint Venture Member&rsquo;s or Specialized Subcontractor&rsquo;s Name: <em>[</em><em>insert</em> <em>full name]</em><br />RFB No. and title: <em>[insert RFB number and title]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><tbody><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:630px\"><p>Environmental and Social Performance Declaration</p><p>in accordance with Section III, Evaluation and Qualification Criteria</p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:630px\"><p>&nbsp; <strong>No suspension or termination of contract</strong>: An employer has not suspended or terminated a contract and/or called the performance security for a contract for reasons related to Environmental or Social (ES) performance since the date specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.5.</p><p>&nbsp; <strong>Declaration of </strong><strong>suspension or termination of contract</strong>:&nbsp; The following contract(s) has/have been suspended or terminated and/or Performance Security called by an employer(s) for reasons related to Environmental or Social (ES) performance since the date specified in Section III, Evaluation and Qualification Criteria, Sub-Factor 2.5. Details are described below:</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><strong>Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Suspended or terminated portion of contract</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><strong>Contract Identification</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><strong>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for suspension or termination: <em>[indicate main reason(s) e.g., gender-based violence; sexual exploitation or sexual abuse breaches]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>[insert amount and percentage]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for suspension or termination: <em>[indicate main reason(s)]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>&hellip;</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><em>&hellip;</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:342px\"><p><em>[list all applicable contracts]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>&hellip;</em></p></td></tr><tr><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:630px\"><p><strong>Performance Security called by an employer(s) for reasons related to </strong><strong>ES performance</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p>Year</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>Contract Identification</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p>Total Contract Amount (current value, currency, exchange rate and US$ equivalent)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p><em>[insert </em><em>year]</em></p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>Contract Identification: <em>[indicate complete contract name/ number, and any other identification]</em></p><p>Name of Employer: <em>[insert full name]</em></p><p>Address of Employer: <em>[insert street/city/country]</em></p><p>Reason(s) for calling of performance security: <em>[indicate main reason(s) e.g., for gender-based violence; sexual exploitation, or sexual abuse breaches]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p><em>[insert amount]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:65px\"><p>&nbsp;</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:444px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:121px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CON &ndash; 4</strong></p><p><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment Performance Declaration </strong></p><p><em>[</em><em>The following table shall be filled in by the Bidder, each member of a Joint Venture and each subcontractor proposed by the Bidder]</em></p><p>Bidder&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Joint Venture Member&rsquo;s or Subcontractor&rsquo;s Name: <em>[</em><em>insert</em> <em>full name]</em><br />RFB No. and title: <em>[insert RFB number and title]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p><strong>SEA and/or SH Declaration </strong></p><p><strong>in accordance with Section III,</strong> <strong>Evaluation and Qualification Criteria</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>We:</p><p>&uml; (a) have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p><p>&uml;&nbsp; (b) are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations</p><p>&uml; (c) had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p><strong>[</strong><strong><em>If (c) above is applicable</em></strong><strong>, <em>attach evidence of an arbitral award reversing the findings on the issues underlying the disqualification.]</em></strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form CCC</strong></p><p><strong>Current Contract Commitments / Works in Progress</strong></p><p>Bidders and each member to a JV should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:126px\"><p><strong>Name of contract</strong></p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p><strong>Employer, contact address/tel/fax</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Value of outstanding work (current US$ equivalent)</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Estimated completion date</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:120px\"><p><strong>Average monthly invoicing over last six months<br />(US$/month)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>1.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>2.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>3.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>4.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>5.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p>etc.</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:1px solid black; vertical-align:top; width:108px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:120px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN &ndash; 3.1</strong></p><p><strong>Financial Situation</strong></p><p><strong>Historical Financial Performance</strong></p><p>Bidder&rsquo;s Legal Name: _______________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _______________________<em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>RFB&nbsp;&nbsp; No.:&nbsp; __________________</p><p>Page _______ of _______ pages</p><p>To be completed by the Bidder and, if JV, by each member</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:658px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:13px; vertical-align:top; width:106px\"><p><strong>Financial information in US$ equivalent</strong></p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:13px; vertical-align:top; width:552px\"><p><strong>Historic information for previous ______ (__) years</strong></p><p>&nbsp;(US$ equivalent in 000s)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:126px\"><p><strong>2022/23</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p><strong>2023/24</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p><strong>2024/25</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:96px\"><p><strong>Avg.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:102px\"><p><strong>Avg. Ratio</strong></p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:658px\"><p><strong>Information from Balance Sheet</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Assets (TA)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Liabilities (TL)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Net Worth (NW)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Current Assets (CA)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Current Liabilities (CL)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:658px\"><p><strong>Information from Income Statement</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Total Revenue (TR)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:102px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:106px\"><p><strong>Profits Before Taxes (PBT)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:126px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:114px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Attached are copies of financial statements (balance sheets, including all related notes, and income statements) for the years required above complying with the following conditions:</strong></p><ol><li><strong>Must reflect the financial situation of the Bidder or member to a JV, and not sister or parent companies</strong></li><li><strong>Historic financial statements must be audited by a certified accountant</strong></li><li><strong>Historic financial statements must be complete, including all notes to the financial statements</strong></li><li><strong>Historic financial statements must correspond to accounting periods already completed and audited (no statements for partial periods shall be requested or accepted)</strong></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN &ndash; 3.2</strong></p><p><strong>Average Annual Turnover</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: ____________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p><em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em>Page _______ of _______ pages</p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:618px\"><p><strong>Annual turnover data&nbsp; </strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:100px\"><p>Year</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; vertical-align:top; width:344px\"><p>Amount and Currency</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:174px\"><p>US$ equivalent</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2022/23</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2023/24</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p>2024/25</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:100px\"><p><strong>*Average Annual Turnover</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:344px\"><p>&nbsp;_________________________________________</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:174px\"><p>____________________</p></td></tr></tbody></table><p>&nbsp;</p><p>*Average annual turnover calculated as total certified payments received for work in progress or completed, divided by the number of years specified in Section III, Evaluation Criteria, Sub-Factor 2.3.2.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form FIN3.3</strong></p><p><strong>Financial Resources</strong></p><p>Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines of credit, and other financial means, net of current commitments, available to meet the total cash flow demands of the subject contract or contracts as indicated in Section III, Evaluation and Qualification Criteria</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; height:25px; vertical-align:top; width:420px\"><p><strong>Source of financing</strong></p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:25px; vertical-align:top; width:186px\"><p><strong>Amount (US$ equivalent)</strong></p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>1.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>2.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>3.</p><p>&nbsp;</p></td><td style=\"border-bottom:none; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:1px solid black; vertical-align:top; width:420px\"><p>4.</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP 4.1</strong></p><p><strong>Experience </strong></p><p><strong>General Experience</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ____________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name:&nbsp; ____________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; width:72px\"><p><strong>Starting Month / Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:78px\"><p><strong>Ending Month / Year</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:60px\"><p>&nbsp;</p><p><strong>&nbsp;Years* </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:336px\"><p><strong>Contract Identification </strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; width:84px\"><p><strong>Role of Bidder</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;contract performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:78px\"><p>&nbsp;</p><p>______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:336px\"><p>Contract name:</p><p>Brief Description of the &nbsp;&nbsp;contract&nbsp;&nbsp; performed by the Bidder:</p><p>Name of Employer:</p><p>Address:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>_________</p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>*List calendar year for years with contracts with at least nine (9) months activity per year starting with the earliest year</p><p><strong>Form EXP &ndash;4.</strong><strong>2(a)</strong></p><p><strong>Specific Experience</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:241px\"><p><strong>Similar Contract Number:&nbsp; ___ of ___ required.</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:341px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Contract Identification</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Award date</p><p>Completion date</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:29px; vertical-align:top; width:241px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; height:29px; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:29px; vertical-align:top; width:341px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Role in Contract</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:85px\"><p>Member in<br />JV</p><p>&nbsp; </p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>Subcontractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Total contract amount</p></td><td colspan=\"6\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:389px\"><p>US$__________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>If member in a JV or subcontractor, specify participation of total contract amount</p></td><td colspan=\"2\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:84px\"><p>&nbsp;</p><p>______%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:85px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>___________</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:106px\"><p>&nbsp;</p><p>US$_______</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Employer&rsquo;s Name:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:241px\"><p>Address:</p><p>&nbsp;</p><p>Telephone/fax number:</p><p>E-mail:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; vertical-align:top; width:48px\"><p>&nbsp;</p></td><td colspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:341px\"><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:241px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:48px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:36px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:85px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:115px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:106px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\">&nbsp;</td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(a) (cont.)</strong></p><p><strong>Specific Experience</strong><strong> (cont.)</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>JV Member Legal Name:&nbsp; ___________________________</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p><strong>Similar Contract No. __[insert specific number] of [total number of contracts] ___ required</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:325px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Description of the similarity in accordance with Sub-Factor 4.2a) of Section III:</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Amount</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Physical size</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Complexity</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Methods/Technology</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Physical Production Rate</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>_________________________________</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(b)</strong></p><p><strong>Specific Experience in Key Activities</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>Subcontractor&rsquo;s Legal Name: ______________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:332px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Contract Identification</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Award date</p><p>Completion date</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Role in Contract</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>Subcontractor</p><p></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Total contract amount</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>US$________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>If member in a JV or subcontractor, specify participation of total contract amount</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p><p>__________%</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:114px\"><p>&nbsp;</p><p>_____________</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p><p>US$________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Employer&rsquo;s Name:</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:281px\"><p>Address:</p><p>&nbsp;</p><p>Telephone/fax number:</p><p>E-mail:</p></td><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:332px\"><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p><p>_______________________________________</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2 (b)(cont.)</strong></p><p><strong>Specific Experience in Key Activities (cont.)</strong></p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><p>JV Member Legal Name:&nbsp; ___________________________</p><p>Subcontractor&rsquo;s Legal Name: __________________________</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:325px\"><p><strong>Information</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>Description of the key activities in accordance with Sub-Factor 4.2b) of Section III:</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:none; border-top:none; height:47px; vertical-align:top; width:281px\"><p>&nbsp;</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:47px; vertical-align:top; width:325px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form EXP &ndash;4.2(c)</strong></p><p><strong>Specific Experience in Managing ES aspects and any additional sustainable procurement aspects</strong></p><p>&nbsp;</p><p>Bidder&rsquo;s Legal Name:&nbsp; ___________________________&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; _____________________</p><p>JV Member Legal Name: _________________________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No.:&nbsp; __________________&nbsp;&nbsp;</p><p>Subcontractor&rsquo;s Legal Name: ______________&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Page _______ of _______ pages</p><ol><li><ol><li><ol><li><ol><li>Key Requirement no 1 in accordance with 4.2 (c): __</li></ol></li></ol></li></ol></li></ol><p>____________________</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:624px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:256px\"><p>Contract Identification</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:27px; vertical-align:top; width:256px\"><p>Award date</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:27px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:256px\"><p>Completion date</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:368px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:74px; vertical-align:top; width:256px\"><p>Role in Contract</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:92px\"><p>Prime Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:96px\"><p>Member in<br />JV</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:90px\"><p>Management Contractor</p><p></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:74px; width:90px\"><p>Subcontractor</p><p></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:256px\"><p>Total Contract Amount</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; width:368px\"><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; US$ ____________</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:256px\"><p>Details of relevant experience</p></td><td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; width:368px\"><p>&nbsp;</p></td></tr></tbody></table><ol><li><ol><li><ol><li><ol><li>Key Requirement no 2 in accordance with 4.2 (c): <em>______________________</em></li><li>Key Requirement no 3 in accordance with 4.2 (c): <em>______________________</em></li></ol></li></ol></li></ol></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form of Bid Security</strong></p><p><strong>Form of Bid Security &ndash; Bank Guarantee</strong></p><p>&nbsp;</p><p><em>[The bank shall fill in this Bank Guarantee Form in accordance with the instructions indicated.]</em></p><p>&nbsp;</p><p><em>[Guarantor letterhead or SWIFT identifier code]</em></p><p><strong>Beneficiary:&nbsp; </strong><em>[Employer to insert its name and address]</em></p><p><strong>RFB No.:</strong><em>[Employer to insert reference number for the Request for Bids]</em></p><p><strong>Alternative No</strong><em>.: [Insert identification No if this is a Bid for an alternative]</em></p><p><strong>Date:</strong><em>[Insert date of issue]</em></p><p><strong>BID GUARANTEE No.:</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor:&nbsp; </strong><em>[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p>We have been informed that ______ <em>[insert name of the Bidder, which in the case of a joint venture shall be the name of the joint venture (whether legally constituted or prospective) or the names of all members thereof]</em>(hereinafter called &quot;the Applicant&quot;) has submitted or will submit to the Beneficiary its Bid (hereinafter called &quot;the Bid&quot;) for the execution of ________________ under RFB No. ____________</p><p>Furthermore, we understand that, according to the Beneficiary&rsquo;s conditions, Bids must be supported by a Bid guarantee.</p><p>At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ (____________) upon receipt by us of the Beneficiary&rsquo;s complying demand, supported by the Beneficiary&rsquo;s statement, whether in the demand itself or a separate signed document accompanying or identifying the demand, stating that either the Bidder:</p><p>(a) &nbsp;&nbsp;&nbsp; has withdrawn its Bid prior to the Bid validity expiry date set forth in the Applicant&rsquo;s Letter of Bid, or any extended date provided by the Applicant; or</p><p>(b) &nbsp;&nbsp; having been notified of the acceptance of its Bid by the Beneficiary prior to the expiry date of the Bid validity or any extension thereto provided by the Applicant, (i) has failed to execute the Contract Agreement, or (ii) has failed to furnish the Performance Security, in accordance with the Instructions to Bidders (&ldquo;ITB&rdquo;) of the Beneficiary&rsquo;s bidding document.</p><p>This guarantee will expire: (a) if the Applicant is the successful Bidder, upon our receipt of copies of the contract agreement signed by the Applicant and the Performance Security issued to the Beneficiary in relation to such contract agreement; or (b) if the Applicantis not the successful Bidder, upon the earlier of (i) our receipt of a copy of the Beneficiary&rsquo;s notification to the Applicant of the results of the Bidding process; or (ii)twenty-eight days after the expiry date of the Bid validity.</p><p>Consequently, any demand for payment under this guarantee must be received by us at the office indicated above on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758.</p><p>&nbsp;</p><p><strong>_____________________________</strong></p><p><em>[Signature(s)]</em></p><p><strong><em>Note:&nbsp; All italicized text is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Manufacturer&rsquo;s Authorization</strong></p><p>&nbsp;</p><p>Date: <em>__________________</em></p><p>RFB No.: <em>_________________</em></p><p>To:&nbsp; <em>________________________</em></p><p>WHEREAS</p><p>&nbsp;</p><p>We <em>___________________,</em> who are official manufacturers of<em>____________________,</em> having factories at _____________________, do hereby authorize <em>______________________ </em>to submit a Bid the purpose of which is to provide the following goods, manufactured by us <em>_______________________,</em> and to subsequently negotiate and sign the Contract.</p><p>&nbsp;</p><p>We hereby extend our full guarantee and warranty in accordance with Clause 27 of the General Conditions, with respect to the goods offered by the above firm.</p><p>&nbsp;</p><p>Signed: <em>_______________________________________</em></p><p>&nbsp;</p><p>&nbsp;</p><p>Name: <em>______________________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>&nbsp;</p><p>Title:<em>______________________________________</em></p><p>&nbsp;</p><p>Duly authorized to sign this Authorization on behalf of: <em>______________________________________</em></p><p>&nbsp;</p><p>Dated on ____________ day of __________________, _______</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENT</em></p><p><em>The Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder&rsquo;s complete name and business address.</em></p><p><em><u>Note</u>: All italicized text is to help Bidders in preparing this form. </em></p></td></tr></tbody></table><p><br />Letter of Bid - Financial Part</p><p>&nbsp;</p><p><strong>Date of this Bid submission</strong>: [<em>insert date (as day, month and year) of Bid submission</em>]</p><p><strong>Request for Bid No</strong>.: [<em>insert identification</em>]</p><p><strong>Alternative No.</strong>:<em> </em>[<em>insert identification No if this is a Bid for an alternative</em>]</p><p>&nbsp;</p><p>To: <strong>[<em>insert complete name of Employer</em>]</strong></p><p>&nbsp;</p><p>We, the undersigned, hereby submit the second part of our Bid, the Bid Price and Bill of Quantities. This accompanies the Letter of Bid- Technical Part.</p><p>In submitting our Bid, we make the following additional declarations:</p><ol><li><strong>Bid Validity</strong>: Our Bid shall be valid until <em>[insert day, month and year in accordance with ITB 19.1]</em>, and it shall remain binding upon us and may be accepted at any time on or before this date;</li><li><strong>Total Price</strong>: The total price of our Bid, excluding any discounts offered in item (f) below is: [Insert one of the options below as appropriate]</li></ol><p><em>[Option 1, in case of one lot:]</em>&nbsp; Total price is: <u>[<em>insert the total price of the Bid in words and figures, indicating the various amounts and the respective currencies</em>];</u></p><p>Or</p><p><em>[Option 2, in case of multiple lots:]</em> (a) Total price of each lot [<em>insert the total price of each lot in words and figures, indicating the various amounts and the respective currencies</em>]; and (b) Total price of all lots (sum of all lots) [<em>insert the total price of all lots in words and figures, indicating the various amounts and the respective currencies</em>];</p><ol><li><strong>Discounts:</strong> The discounts offered and the methodology for their application are:</li></ol><p>(i) The discounts offered are: [<em>Specify in detail each discount offered</em>]</p><p>(ii) The exact method of calculations to determine the net price after application of discounts is shown below: [<em>Specify in detail the method that shall be used to apply the discounts</em>];</p><ol><li><strong>Commissions, </strong>gratuities<strong> and fees:</strong> We have paid, or will pay the following commissions, gratuities, or fees with respect to the Bidding process or execution of the Contract: [<em>insert complete name of each Recipient, its full address, the reason for which each commission or gratuity was paid and the amount and currency of each such commission or gratuity</em>].</li></ol><p>&nbsp;&nbsp;&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:168px\"><p>Name of Recipient</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:168px\"><p>Address</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:138px\"><p>Reason</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:103px\"><p>Amount</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:103px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>(If none has been paid or is to be paid, indicate &ldquo;none.&rdquo;)</p><p>&nbsp;</p><p><strong>Name of the Bidder</strong>:*[<em>insert complete name of&nbsp; the Bidder</em>]</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: ** [<em>insert complete name of person duly authorized to sign the Bid</em>]</p><p><strong>Title of the person signing the Bid</strong>: [<em>insert complete title of the person signing the Bid</em>]</p><p><strong>Signature of the person named above</strong>: [<em>insert signature of person whose name and capacity are shown above</em>]</p><p><strong>Date signed</strong> [<em>insert date of signing</em>] <strong>day of</strong> [<em>insert month</em>], [<em>insert year</em>]</p><p>&nbsp;</p><p><strong>*</strong>: In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder.</p><p>**: Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule of Rates and Prices</strong></p><p><strong>Price schedule to be accessed from the following link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p><strong>Schedule No. 1.&nbsp; Plant and Mandatory Spare Parts Supplied from Abroad</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Country of Origin Declaration Form</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 2.&nbsp; Plant and Mandatory Spare Parts Supplied from Within the Employer&rsquo;s Country</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:600px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:504px\"><p>&nbsp;</p><p>&nbsp;</p><p>1 Specify currency in accordance with specifications in Bid Data Sheet under ITB 18.1</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:96px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 3.&nbsp; Design Services</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 4.&nbsp; Installation and Other Services</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Schedule No. 5.&nbsp; Grand Summary</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Price Adjustment</strong></p><p>&nbsp;</p><p>If price adjustment applies in accordance with ITB 17.9, the Bidder shall indicate the sources of indices and source of exchange rate (if applicable) and the base date indices in its Bid.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:159px\"><p>Item</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:165px\"><p>Source of Indices</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:150px\"><p>Base date Indices</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:165px\"><p>Source of exchnage rate (if applicable)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:159px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:150px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:165px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Section V - Eligible Countries</strong></p><p>&nbsp;</p><p><strong>Eligibility for the Provision of Goods, Works and Non-Consulting Services in<br />Bank-Financed Procurement</strong></p><p>&nbsp;</p><p>In reference to ITB 4.8 and 5.1, for the information of the Bidders, at the present time firms, goods and services from the following countries are excluded from this Bidding process: <strong>None</strong></p><p>Under ITB 4.8 (a) and 5.1: <strong>None</strong></p><p><br />&nbsp;</p><p>&nbsp;</p><p><strong>Section VI - Fraud and Corruption</strong></p><p><strong>(this Section shall not be changed)</strong></p><p>&nbsp;</p><ol><li><strong>Purpose</strong><ol><li>The Bank&rsquo;s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.</li></ol></li><li><strong>Requirements</strong></li></ol><ol><li>The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.</li><li>To this end, the Bank:</li></ol><ol><li>Defines, for the purposes of this provision, the terms set forth below as follows:</li></ol><ol><li>&ldquo;corrupt practice&rdquo; is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;</li><li>&ldquo;fraudulent practice&rdquo; is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;</li><li>&ldquo;collusive practice&rdquo; is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;</li><li>&ldquo;coercive practice&rdquo; is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;</li><li>&ldquo;obstructive practice&rdquo; is:</li></ol><ol><li>deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or</li><li>acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights provided for under paragraph 2.2 e. below.</li></ol><ol><li>Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;</li><li>In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question,&nbsp; without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time&nbsp; they knew of the practices;</li><li>Pursuant to the Bank&rsquo;s Anti- Corruption Guidelines and in accordance with the Bank&rsquo;s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[9] (ii) to be a nominated[10] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;</li><li>Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents, personnel, permit the Bank to inspect[11] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.</li></ol><p>&nbsp;</p><p><strong>PART 2 - Employer&rsquo;s Requirements</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:53px; width:613px\"><p><strong>Section VII - Employer&rsquo;s Requirements</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Contents</strong></p><p><strong>Scope of Supply of Plant and Installation Services by the Contractor. 160</strong></p><p><strong>Specification. 161</strong></p><p><strong>Forms and Procedures. 168</strong></p><p>Form of Completion Certificate. 169</p><p>Change Order Procedure and Forms. 171</p><p>Change Order Procedure. 172</p><p>Annex 1.&nbsp; Request for Change Proposal 173</p><p>Annex 2.&nbsp; Estimate for Change Proposal 175</p><p>Annex 3.&nbsp; Acceptance of Estimate. 177</p><p>Annex 4.&nbsp; Change Proposal 178</p><p>Annex 5.&nbsp; Change Order 181</p><p>Annex 7.&nbsp; Application for Change Proposal 184</p><p><strong>Drawings. 186</strong></p><p><strong>Supplementary Information. 187</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Scope of Supply of Plant and Installation Services by the Contractor</strong></p><p>The scope covers the design, supply, equipment installation and commissioning of the 13 pole mounted 11kV auto-reclosers as per the configuration shown in the figure below. The scope highlighted below is a guide to the bidder and any tasks necessary to deliver the project as per the bidder&rsquo;s design should be included in the scope to be submitted.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><strong>Design</strong><strong> </strong></li></ol></li></ol><p>&nbsp;</p><p>The following is to be done by the supplier.</p><ol><li>Prepare design report and drawings for the structure to replace existing auto-reclosers with fully remotely operated breakers. The same design to be also used in the proposed new sites. (One Standard Structure &ndash; To be used in all 13 structures).</li><li>Design and install an earthing system where the earth resistance should be less than 5 ohms.</li><li>Drawings to be approved by EEC prior to installation.</li><li>Specify interface between pole mount Control Unit and Breaker</li><li>Capture coordinates of the different points where the remotely controlled auto-reclosers will be installed and check for UHF signal availability in all the sites.</li><li>Do frequency planning for UHF Data radios to be used for communication between SCADA &ndash; NCC and Control Unit.</li></ol><p><strong><em>Note: </em></strong><em>In certain instances, use the nearest substation with UMUX Interface.</em></p><ol><li><ol><li><strong>Procurement:</strong></li></ol></li></ol><p>The following will have to be procured for the project.</p><p><strong>Externally (Provided by supplier):</strong></p><ol><li>13 Remotely controlled auto recloser breakers, accessories, software and licencing. The general circuit breaker specification is included under &lsquo;Specifications.&rsquo; This includes the Control Units and Switchgear.</li><li>Data radios with UHF antennas (Depending on frequency planning) , accessories, software and licencing.</li><li>Depending on interface between radios, control unit and breaker &ndash; supplier to provide interface cables and accessories.</li><li>Single phase Power cables and accessories.</li><li>11kV Lightning arrestors</li><li>labels &ndash; danger signs</li><li>11kV Isolating links</li><li>Overhead line material and accessories</li></ol><p>&nbsp;</p><p><strong>Internal (To be supplied by EEC).</strong></p><ol><li>Procure D10 poles (10) limited to 4 structures per site with the relevant cross&ndash;arm depending on design.</li><li>Earthing equipment for all 13 sites (camo conductor, spikes, clamps, lugs for camo conductor, conductive cement). Ensure earth resistance for site is less than 5 Ohms &ndash; depending on design.</li><li>13 of 16kVA single phase transformers, combi units, LV MCB, pole mounted boxes.</li><li>ACSR overhead conductor Hare and Mink<ol><li><strong>Installation</strong><strong> and Commissioning</strong></li></ol></li></ol><p><strong>Construction (Supplier):&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><ol><li>Dismantling of existing 13 structures where applicable.</li><li>Erect the up the pole structure per site in all the identified 13 structures.</li><li>Install, test and commission Auto recloser and mount control unit.</li><li>String ACSR and install corresponding dropout fuses.</li><li>Ensure all equipment in structure is properly earthed and take earth resistance for record keeping. (Earth resistance to be below 5 Ohms)</li><li>Install, test and commission 16kVA transformers and corresponding MV LV equipment</li><li>Recover old recloser for disposal / keeping as spare (<strong>to be done by EEC)</strong>.</li><li>Installation of bypass gang switch and structure (<strong>to be done by EEC)</strong>.</li></ol><p>&nbsp;</p><p><strong>Protection (bidder):</strong></p><ol><li>Configure the breaker and prepare it for interface with the SCADA System.</li><li>Ensure all analogue and digital points are ready for the SCADA department.</li><li>Commission the breaker with the SCADA department.</li></ol><p>&nbsp;</p><p><strong>Telecommunications (Supplier):</strong></p><ol><li>Install Data radio with all accessories (Antenna, feeder cable, and interface to Control Unit) and ensure connectivity to NCC.</li><li>Configure the Data radio.</li><li>Commission link to NCC.</li><li>Ensure all the radio equipment is properly earthed.</li></ol><p>&nbsp;</p><p><strong>SCADA (Supplier):</strong></p><ol><li>Build all the breakers in the main SCADA System together with EEC personnel.</li><li>Mount Control Unit and configure it for remote operation to NCC.</li><li>Ensure proper earthing of all SCADA equipment and provide power backup for Control Unit.</li><li>Test and Commission the auto recloser to NCC with EEC personnel.</li><li>Prepare final documentation for all the SCADA related equipment.</li><li>Update the network diagram as per procedure for all new projects (<strong>to be done by EEC)</strong>.<ol><li><strong>Training</strong></li></ol></li></ol><p>Provide formal training on the equipment as well. This should be specified in the quotation for the project. The training should be done before project implementation (State the period for training on the breaker, control unit and any other training that might be required for the project). Training should cover 25 technicians from the different sections internally (SCADA, Protection, Switchgear, Distribution, Telecoms).</p><ol><li><strong>METHODOLOGY</strong></li></ol><p>The bidders are expected to provide a methodology showing how the design, construction, installation and commissioning exercise will be carried out. Include block diagrams where appropriate showing how the entire system integrates. This will indicate the level of understanding of what is expected from the Plant design, supply and installation Contractor.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Specification</strong></p><p>This specification covers the requirements for an automatic electrically controlled three phase vacuum recloser for distribution systems. The recloser is intended for radial, loop, and meshed networks.</p><ol><li><ol><li><strong>Quality Assurance</strong></li></ol></li></ol><p>&nbsp;</p><p>3.2.1 Manufacturer qualifications: The chosen manufacturer shall have at least 10 years&rsquo; experience in manufacturing vacuum reclosers. The manufacturer of the reclosers shall be completely and solely responsible for the performance of the reclosers as a complete integrated assembly as rated.</p><p>3.2.2 Main recloser components such as circuit breaker, vacuum interrupters, current and voltage sensors, control cubicle and software shall be manufactured by the same manufacturer.</p><p>3.2.3 The manufacturer shall be able to submit the confirmation of certification or ratings of the reclosers upon request.</p><p>3.2.4 The recloser shall be manufactured and type tested according to requirements of applicable industry standards:</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a) IEC 62271-111</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; b) IEEE C37.60</p><p>3.2.5 The recloser manufacturing process shall be complying with the standard ISO 9001, Quality Management System.</p><p>3.2.6 The type test reports should be issued not more than 5 years before the submission date.</p><p>3.2.7 The manufacturer shall provide minimum 5-year warranty for all components provided.</p><p>3.2.8 The circuit breaker shall be maintenance free over a total life expectancy.</p><p>&nbsp;</p><p><strong>3.3&nbsp;&nbsp; Delivery, storage, and handling</strong></p><p>3.3.1 Packing components shall not contain any materials that are hazardous to the environment or personnel. No special methods of disposal shall be required.</p><p>3.3.2 All recloser components including circuit breaker, control cubicle, installation frame, pole interface provisions, fasteners shall be delivered in a single package made of recyclable materials.</p><p>3.3.3 The package gross weight shall not exceed 300 kg.</p><p>3.3.4 It shall be possible to stack at least two original packages during transportation and storage.</p><p>3.3.5 The package shall allow stapling and outdoor storage in case indoor storage is unavailable. Unpacked and assembled equipment shall be storable outdoor for not less than 1 year without additional treatment before installation.</p><p>3.3.6 All recloser components shall be installed, assembled, and tested in accordance with the requirements of current specification. The recloser shall be delivered fully assembled on the mounting frame and ready for the installation.&nbsp;</p><p>3.3.7 The recloser installation kit shall be designed to reduce the number of lifting operations.</p><p><strong>3.4 Technical Specification</strong></p><p><strong>3.4.1 General</strong></p><p><strong>3.4.1.1 Technical parameters</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>a)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:302px\"><p>Rated maximum voltage, kV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:76px\"><p>12&hellip;15</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>d)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated lightning impulse withstand voltage (peak), kV</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>110</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>e)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated continuous current, A</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>630</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>h)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated short-circuit breaking current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>16</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>i)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated peak withstand current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>41.6</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>j)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated short time withstand current, kA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>16</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>k)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated duration of short circuit, s</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>4</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>l)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated frequency, Hz</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:76px\"><p>50</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>3.4.1.2 Power supply characteristics</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>a)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:302px\"><p>Supply voltage range shall not be less than, V</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:151px\"><p>85 &hellip; 265 AC</p><p>110 &hellip; 220 DC</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>b)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Rated power consumption shall not exceed, VA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>40</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>c)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Maximum power consumption shall not exceed, VA</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>75</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:none; width:28px\"><p>d)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:302px\"><p>Duration of operation without auxiliary supply shall be not less than, hours</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:151px\"><p>48</p></td></tr></tbody></table><p><strong>3.4.2 Recloser control</strong></p><p>3.4.2.1 The recloser operation shall be controlled by electronic control modules.</p><p>3.4.2.2 The recloser control shall provide the following functions: measurement, protection, monitoring, and remote communication.</p><p>3.4.2.3 The recloser control air circulation and dehydration shall be organized to avoid using any humidity control devices or heaters.</p><p>3.4.2.4 The external and internal doors shall be able to be securely fixed in the open position.</p><p>3.4.2.5 It shall be possible to connect the laptop with configuration software by means of serial interface (USB, RS232).</p><p>3.4.2.6 Ethernet (RJ45), Optical Ethernet (SC) SCADA and wireless local engineering access interfaces (Bluetooth, Wi-Fi) shall be available for ordering optionally.</p><p>3.4.2.7 The recloser control shall be equipped with a prewired provision for power supply outlet installation. Socket shall be MCB protected.</p><p>3.4.2.8 The recloser control shall be equipped with a removable provision for communication equipment installation. It shall be located at the top of the controller and provide at least 326x180x108mm space for communication equipment. Stationary provision is not accepted.</p><p>3.4.2.9 The recloser control shall be equipped with the control panel module. The module shall provide local control and indication functions by LED, display, and buttons.</p><p>3.4.2.10 The local control panel module shall be equipped with USB A interface.</p><p>3.4.2.11 The control panel box shall have a provision for a padlock.</p><p><strong>3.4.3 Rechargeable Battery</strong></p><p>3.4.3.1 The recloser shall be supplied with rechargeable battery to provide the recloser control with auxiliary power when the main auxiliary power is not present.</p><p>3.4.3.2 The battery shall be of a sealed lead acid.</p><p>3.4.4.3 The battery shall provide ten full auto reclosing cycles for the recloser without auxiliary power supply.</p><p><strong>3.4.4 Protection</strong></p><p>The auto-recloser shall have the following protection functionalities but not limited to:</p><ol><li>Cold load pickup</li><li>Source detector</li><li>Combined overcurrent and earth fault auto-reclosing</li><li>Directional phase overcurrent</li><li>Directional sensitive earth fault</li><li>Directional earth fault</li><li>Loss of supply</li><li>Zone sequence coordination</li><li>Voltage and current unbalance</li><li>Under-voltage and over voltage auto reclosing</li></ol><p>&nbsp;</p><p><strong>3.4.5 Communication</strong></p><p>The recloser control shall provide:</p><p><strong>3.4.5.1 PMR Telecoms Integration</strong></p><p><strong>1 General Integration </strong></p><ol><li><strong>Turnkey Connectivity Responsibility:</strong> The Contractor shall be fully responsible for the complete end-to-end integration of each Pole-Mounted Recloser (PMR) into the Employer&rsquo;s existing telecoms network via the DNP3 protocol over a 12.5 kHz licensed radio channel.</li></ol><p>&nbsp;</p><ol><li><strong>Scope of Supply:</strong> The Contractor shall provide a fully operational, integrated telemetry solution. The Contractor&rsquo;s scope of supply shall include all hardware, software, licenses, interfaces, and equipment required to establish communication between the PMR and the designated access point, with the sole exception of the physical radio frequency license.</li></ol><p>&nbsp;</p><p><strong>2 Equipment and Hardware Requirements</strong></p><ol><li><strong>Telemetry Equipment Supply:</strong> If an existing Employer-owned Trio QB Access Point has the RF and protocol capacity to absorb the new PMR(s), the Contractor shall supply only the remote-end equipment. This includes, but is not limited to:<ul><li><strong>Remote Radio:</strong> Data radio compatible with the existing network (Existing PMRs use Schneider Electric Trio Q-Series).</li><li><strong>Antenna System:</strong> High-gain directional Yagi antenna, low-loss coaxial cabling, surge arrestors, mounting brackets etc.</li><li><strong>Interface Converters:</strong> e.g., DIGI or equivalent where required</li></ul></li><li><strong>Greenfield Access Point Provisions: </strong>If the Employer determines that existing Access Points cannot absorb the new PMR(s) due to capacity, bandwidth limitations or geographical line-of-sight constraints, the Contractor shall design and supply a completely new network node. In this scenario, the Contractor&rsquo;s scope shall expand to include:<ul><li>Master-end base station equipment</li><li>Omnidirectional antenna.</li><li>All network routing, interfacing, and aggregation hardware required to drop the telemetry traffic back into the Employer&#39;s core telecoms network.</li></ul></li></ol><p>&nbsp;</p><ol><li><strong>Radio Frequency and Licensing</strong></li></ol><ol><li><strong>Employer Responsibility:</strong> The Employer will retain ownership of the radio spectrum (400 &ndash; 430MHz). Should the Contractor&rsquo;s network design or capacity calculations necessitate a new operating frequency, the Employer will undertake and finance the procurement of the new frequency license from the local regulatory authority.</li><li><strong>Contractor Responsibility:</strong> The Contractor must formally notify the Employer in writing during the engineering design phase if a new frequency or access point is required. The Contractor shall provide all technical data necessary for the Employer to file the regulatory spectrum application.</li></ol><p>&nbsp;</p><p><strong>3.4.5.2 SCADA/Telemetry Integration</strong></p><ol><li><strong>General</strong><ol><li>The Contractor shall be responsible for the telemetry configuration and commissioning of the PMR, aligned to the protocol requirements between the SCADA master and the PMR.</li><li>The configuration shall align with the standard addressing requirements for each site</li><li>The Controller/control panel shall have a Type M plug for 230VAC, to allow laptop use on-site.</li></ol></li><li><strong>Protocols</strong><ol><li>The protocol of communication shall be DNP3.0 (Subset Level 3) via the telecoms backbone.</li><li>IEC 60870-5-101 and IEC 60870-5-104 shall be available options for client-server communication.</li><li>The PMR controller shall be configurable for unsolicited communication or reporting to the master.</li><li>The controller shall be configured for time synchronization with the master or where possible or practical via a GPS based local clock</li></ol></li></ol><p>&nbsp;</p><ol><li><strong>Interfaces/ Ports</strong></li></ol><p>&nbsp;</p><p>The PMR panel/controller shall have the following interfaces/ports</p><p>&nbsp;</p><table border=\"1\" style=\"width:602px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p><strong>Port</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p><strong>Physical Interface</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Typical Use</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>USB</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>USB Type-B (front panel)</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Local engineering</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>RS-232 Port</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>DB9</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>SCADA serial communications (DNP3 Serial, IEC60870-5-101)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>Ethernet</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>RJ45 10/100 Mbps</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>SCADA over DNP3 TCP, IEC 60870-5-104</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:135px\"><p>RS-485</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:212px\"><p>Optional</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Third-party modem or serial communications</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong>Cybersecurity</strong></li></ol><p><strong>The following are key cybersecurity requirements;</strong></p><ul><li>Comply with IEC 62443 (Industrial Automation and Control Systems cybersecurity).</li><li>Support IEC 62351 security measures for power system communications, including secure DNP3 communications where applicable.</li><li>Meet the cybersecurity capability requirements of IEEE 1686 for Intelligent Electronic Devices (IEDs).</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Environmental and Social (ES) requirements </strong></p><p><strong>The project Environmental and Social Safeguards and tentative Contractor &ndash; Environment &amp; Social Management Plan templates can be accessed in the following link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p><strong>1. ENVIRONMENTAL AND SOCIAL MANAGEMENT REQUIREMENTS </strong></p><p>The Contractor shall comply with all environmental impact prevention and mitigation measures outlined in the Environmental and Social Management Framework (ESMF) as described herein. Where there is a conflict of requirements, the prevention and mitigation measures listed in the ESMF shall govern.</p><p>The Contractor (and sub-contractors) will need to adopt this ESMF and prepare a comprehensive Contractor&rsquo;s (Construction) Environment and Social Management Plan (CESMP) that will provide the key reference point for compliance.</p><p>The Project Applicant, namely the EEC, is responsible for ensuring that the Contractor Team&rsquo;s execution of the construction phase activities is compliant with the conditions of the ESMF and CESMP. The Contractor must therefore ensure compliance with the ESMF, CESMP, LMP, SEP, SEA/SH Action Plan, GRM Procedure and the OCHSIP at all times during construction activities and maintain environmental and social incidents and GRM registers which keeps a record of all environmental and social incidents as well as community/worker grievances that occur on the site during the installation of the 11kV auto reclosers contracts. These incidents may include:</p><ul><li>Public involvement / complaints.</li><li>Health, safety and SEA/SH incidents.</li><li>Incidents involving Hazardous materials stored on site.</li><li>Non-compliance incidents.</li></ul><p>The Contractor is also responsible for the implementation of corrective actions issued by the Employer within a reasonable or agreed upon period of time.</p><p>Within the first 15 days following contract signing, the Contractor shall present an C-ESMP Implementation Plan. The Plan shall be submitted to the Employer for approval prior to the start of the construction works. The Contractor ESMP shall contain, at a minimum but not limited to, the following components:</p><ul><li>An implementation timetable for the ESMP measures that are integrated with the Contractors&rsquo; work plan and timetable for the construction activities;</li><li>A table that identifies the Environmental and Social Specialist (ESS) as well as the names and responsibilities of each member of the Contractor&rsquo;s team that will be in charge of implementing the C-ESMP;</li><li>An organization chart showing ESS reporting directly to the Project Manager.</li><li>The ESS shall be available to participate in progress meetings with the Environmental Health and Safety Specialists (EHSS) appointed by the Employer;</li><li>The procedures the Contractor will use for internal communication and coordination about the application, monitoring and control of the C-ESMP measures. These procedures should include &ndash; at a minimum &ndash; the dissemination of environmental implementation and the ESMP among the Contractor&rsquo;s corrective actions that will be taken in the event of failure by the Contractor&rsquo;s staff to comply with environmental and social requirements;</li><li>Contractor&rsquo;s Labor Management Procedure, Stakeholder Engagement Procedure, Grievance Redress Mechanism Procedure, a procedure detailing how SEA/SH issues will be handled.</li><li>The procedures the Contractor will use for external communication and coordination with the organizations working on issues related to emergency preparedness and response programs; and Reporting procedures.</li></ul><p>Any deviations from the approved Contractor&rsquo;s (Construction) ESMP must be submitted to the Employer for approval.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><em>Compliance with requirements established in General Condition of Contract (GCC) </em></strong></p><p>The Environmental and Social requirements shall be prepared in a manner that does not conflict with the relevant General Conditions of Contract and Particular Conditions of Contract, and in particular:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:623px\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:72px\"><p>GCC</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:130px\"><p>&nbsp;Sub-Clause/Clause</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:bottom; width:421px\"><p>Remarks</p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:72px\"><p><em>9.10</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:130px\"><p><em>Training of Contractor&rsquo;s Personnel</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:205px; vertical-align:top; width:421px\"><p>The Contractor shall ensure that all Contractor personnel receive mandatory training on Environmental and Social (E&amp;S) requirements prior to commencement of works. Training shall include, at a minimum: (i) CESMP obligations; (ii) pollution prevention and waste management; (iii) community health and safety risks; (iv) SEA/SH awareness and Code of Conduct; (v) grievance redress procedures; and (vi) emergency preparedness and response. Refresher training and toolbox talks shall be conducted periodically.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>20</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Design and Engineering</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall ensure that all designs comply with applicable national legislation, Environmental Authorization conditions, and World Bank ESF requirements (particularly ESS4). Designs shall: (i) incorporate climate resilience measures (e.g. flood risk, extreme weather tolerance); (ii) ensure universal access where applicable; (iii) minimize environmental footprint and vegetation clearing; (iv) assess and mitigate risks to the public from operational hazards; and (v) comply with applicable engineering and safety certification standards. All designs shall be reviewed and approved prior to implementation.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.2.4</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Rates of wages and conditions of labor</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall comply with the Labour Management Procedures (LMP), national labour laws, and ESS2 requirements. This includes: (i) fair wages in line with national minimum standards; (ii) safe and decent working conditions; (iii) prohibition of child labour and forced labour; (iv) non-discrimination and equal opportunity; and (v) provision of written contracts to all workers.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.2.6</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Facilities for Staff and Labor</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall provide adequate facilities for all personnel, including: (i) safe drinking water; (ii) sanitary and washing facilities segregated where appropriate; (iii) waste management systems; (iv) first aid and medical access; and (v) where accommodation is required, it shall meet GIIP and national standards. Facilities shall be culturally appropriate and accessible, and shall not create environmental or social risks to surrounding communities (ESS2 &amp; ESS4).</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.8</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Security of the Site</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall establish security arrangements consistent with ESS4 and GIIP. Security measures shall be proportionate to the level of risk and shall respect human rights. The Contractor shall: (i) avoid use of excessive force; (ii) train security personnel on Code of Conduct and SEA/SH prevention; (iii) coordinate with local authorities; and (iv) ensure security does not restrict community access unnecessarily. All incidents involving security personnel shall be recorded and reported.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.9</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Protection of the Environment</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall implement all necessary measures to prevent pollution and environmental degradation in accordance with ESS3 and national legislation. The following limits and controls shall apply:</p><ol><li>Hazardous materials must be stored in bunded areas;</li><li>&nbsp;Dust emissions shall be controlled to prevent nuisance beyond site boundaries;</li><li>&nbsp;Noise levels shall comply with national standards and approved working hours;</li><li>All waste shall be segregated and disposed of at licensed facilities; and</li><li>Fuel and oil spills shall be contained and remediated immediately. The CESMP shall define monitoring measures, thresholds, and corrective actions.</li></ol><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:72px\"><p><em>22.11 </em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\"><p><em>Cultural Heritage Findings</em></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:421px\"><p>The Contractor shall implement a Chance Finds Procedure in accordance with ESS8. In the event of discovery of cultural heritage resources:</p><ol><li>All works shall stop immediately in the affected area;</li><li>The site shall be secured;</li><li>&nbsp;Relevant authorities shall be notified; and</li></ol><p>Works shall only resume upon formal clearance.</p><ol><li>Workers shall be trained on recognizing and reporting chance finds.</li></ol></td></tr></tbody></table><p>&nbsp;</p><p><strong>2. Environmental Monitoring and Reporting Requirements</strong></p><p>The Contractor shall establish and implement an Environmental Monitoring and Reporting Programme as part of the CESMP to ensure compliance with environmental requirements and to verify the effectiveness of mitigation measures in accordance with ESS1 of the World Bank ESF and applicable national legislation.</p><p>Environmental monitoring shall be risk-based, proportionate to the scale and nature of the works, and shall cover all significant environmental aspects associated with construction activities.</p><p>a) <strong>Monitoring Parameters</strong></p><p>The monitoring programme shall include, at a minimum, the following parameters <strong>(where applicable):</strong></p><ul><li>Surface water and groundwater quality (where works occur near water bodies);</li><li>Soil erosion and sediment control;</li><li>Waste generation, storage, and disposal practices;</li><li>Hazardous materials storage and handling;</li><li>Vegetation clearance and site disturbance;</li><li>Rehabilitation of disturbed areas;</li><li>Fuel and oil storage areas (including spill risks).</li></ul><p>&nbsp;</p><p>Environmental monitoring is essential to assess impacts such as air, water, soil, and noise pollution arising from construction activities and to ensure mitigation measures are effective.</p><p>&nbsp;</p><p>b) Monitoring Frequency and Methods</p><p>The Contractor shall:</p><ul><li>Conduct routine site inspections (daily and weekly as appropriate);</li><li>Carry out periodic quantitative monitoring (e.g. noise, dust) where risks justify;</li><li>Use appropriate, calibrated equipment for environmental measurements;</li><li>Establish baseline conditions where required;</li><li>Adjust monitoring frequency based on risk level and findings.</li></ul><p>&nbsp;</p><p>c) <strong>Environmental Registers and Records</strong></p><p>The Contractor shall maintain up-to-date records, including:</p><ul><li>Environmental monitoring results;</li><li>Waste tracking records (generation, transport, disposal);</li><li>Hazardous substances register (including MSDS);</li><li>Incident and spill records;</li><li>Complaints and grievance records related to environmental issues.</li></ul><p>&nbsp;</p><p>d) <strong>Reporting Requirements</strong></p><p>The Contractor shall:</p><ul><li>Submit monthly environmental monitoring reports to the Employer;</li><li>Include monitoring results, non-compliance issues, corrective actions, and trends;</li><li>Immediately (within 24 hours) report any significant environmental incident (e.g., spills, contamination events, major non-compliance);</li></ul><p>Maintain records for audit and inspection purposes.</p><p>e) <strong>Non-Compliance and Corrective Actions</strong></p><p>Where monitoring identifies non-compliance:</p><p>&nbsp;</p><ul><li>Immediate corrective action shall be implemented;</li><li>Root cause analysis shall be conducted;</li><li>Additional mitigation measures shall be introduced;</li><li>Follow-up monitoring shall confirm effectiveness of corrective measures.</li></ul><p>&nbsp;</p><p>f) <strong>Roles and Responsibilities</strong></p><p>&nbsp;</p><ul><li>The Environmental and Social Specialist (ESS) shall be responsible for implementation of the monitoring programme;</li><li>The ESS shall report directly to the Project Manager and liaise with the Employer Specialists;</li><li>All site personnel shall support monitoring activities and comply with environmental requirements.</li></ul><p>&nbsp;</p><p>A Rehabilitation Plan shall also be prepared, which shall include preliminary designs on the temporary and permanent landscaping plan during both the construction and post-construction maintenance period. The landscape plan shall cover all project works which may affect vegetation and natural landform (e.g. borrow pits, disposal sites and temporary and stockpiling areas). Sensitive locations and areas where landscaping works are required both during construction and after the construction shall be identified and incorporated into the design.</p><p><strong>3. Environmental and Social Implementation Plans (MSIPs) </strong></p><p>The Contractor shall prepare a Construction Environmental and Social Management Plan, implementation plan, referred to, in this document as CESMP implementation plan based on the Project ESMF.</p><p><strong>4. Requirements for competence of Environmental and Social Specialist </strong></p><p>Contractor shall certify that:</p><ul><li>ES Specialist shall be appointed and assigned duties throughout the period of the Contract connected with the environmental and social control activities on the Site.</li><li>The proposed ES Specialist shall be qualified and experienced to supervise and monitor compliance with the ESMF and CESMP and shall, in particular but without limitation, carry out auditing of the operation of the CESMP in accordance with a rolling program to be submitted, from time to time, to the Employer for his consent. The ES specialist should have an understanding of World Bank ESF requirements to which compliance to CESMP by the contractor shall be measured.</li></ul><p>&nbsp;</p><ul><li>ES Specialist shall not be removed from the site without the express written permission of the Employer. Within fourteen (14) days of any such removal or notice of intent of removal, a replacement ES Specialist shall be nominated for approval by the Employer.</li><li>ES Specialist shall be empowered to instruct employees of the Contractor and Subcontractors to cease operations and shall take the appropriate action as is necessary and within his limits of delegation by informing the Employer as may be appropriate to prevent unsafe working practices or other infringements of the Plan or other statutory regulations.</li><li>ES Specialists shall maintain a daily site diary comprehensively recording all relevant matters concerning site environmental and social management, safety and traffic control, inspections and audits, related incidents and the like. The site diary shall be available at all times for inspection by the Employer and his staff.</li></ul><p><strong>5. Applicable ESS Documents for CESMP </strong></p><p>Contractor shall use and apply when establishing the Contractor&rsquo;s (Construction) ESMP the following project documents:</p><ul><li>ESMF</li><li>Stakeholders Engagement Plan, Labor Management Plan, Grievance Redress Mechanism Procedure, A procedure for handling SEA/SH issues;</li><li>Occupational Community Health and Safety Implementation Plan (OCHSIP)</li><li>Environmental Authorization issued by the Eswatini Electricity Company</li><li>Applicable environmental and social laws of Kingdom of Eswatini;</li><li>World Bank&rsquo;s Environmental and Social Standards;</li><li>Good International Industrial Practices (ISO 9001, ISO 14001, ISO 45001, etc.);</li><li>Contractor&rsquo;s Method Statement developed based on Contractor specific tasks on construction sites;</li></ul><p><strong>6. ENVIRONMENTAL MANAGEMENT REQUIREMENTS</strong></p><p>The Contractor shall implement all environmental management measures in accordance with:</p><ul><li>World Bank Environmental and Social Framework (ESF), particularly ESS1 (Assessment and Management of Environmental and Social Risks and Impacts), ESS3 (Resource Efficiency and Pollution Prevention and Management), ESS4 (Community Health and Safety), and ESS6 (Sustainable Management of Living Natural Resources);</li><li>The Eswatini Environment Management Act (2002) and relevant Environmental Impact Assessment (EIA) Regulations;</li><li>Project Environmental and Social Management Framework (ESMF) and ESMP;</li><li>Good International Industry Practice (GIIP), including ISO 14001 Environmental Management Systems.</li></ul><p><strong>(a) Environmental Compliance and Permitting</strong></p><p>The Contractor shall:</p><ul><li>Ensure all required environmental approvals, licenses, and permits are obtained prior to commencement of works;</li><li>Comply with conditions of the Environmental Authorization issued for the project;</li><li>Adhere to all national environmental laws and standards on waste, emissions, water use, and pollution control.</li></ul><p><strong>(b) Pollution Prevention and Resource Efficiency &amp; Management (ESS3)</strong></p><p>The Contractor shall implement measures to prevent, minimize, and control pollution, including:</p><ul><li><strong>Air Quality Control</strong><ul><li>Suppress dust through water spraying and proper site management;</li><li>Maintain construction equipment to minimize exhaust emissions;</li></ul></li><li><strong>Noise and Vibration Control</strong><ul><li>Limit construction activities to approved working hours;</li><li>Use properly maintained equipment and silencers;</li></ul></li><li><strong>Water Protection</strong><ul><li>Prevent contamination of surface and groundwater;</li><li>Avoid discharge of untreated wastewater into the environment;</li></ul></li><li><strong>Hazardous Materials Management</strong><ul><li>Store fuels, oils, and chemicals in bunded areas;</li><li>Maintain Material Safety Data Sheets (MSDS) on-site;</li><li>Provide spill kits and train workers in spill response;</li></ul></li><li><strong>Waste Management</strong><ul><li>Apply waste hierarchy: reduce, reuse, recycle;</li><li>Separate hazardous and non-hazardous waste;</li><li>Dispose of waste only at approved facilities.</li></ul></li></ul><p>&nbsp;</p><p><strong>(c) Soil, Land and Vegetation Management</strong></p><p>The Contractor shall:</p><ul><li>Minimize land clearing and vegetation removal;</li><li>Restrict activities within designated work areas;</li><li>Prevent soil erosion through erosion control measures (e.g., silt fences, drainage control);</li><li>Restore disturbed areas to original or acceptable condition after construction;</li><li>Prevent invasive species introduction during rehabilitation.</li></ul><p><strong>d) </strong><strong>Biodiversity Conservation and Sustainable Management of Living Natural Resources</strong><strong>&nbsp; (ESS6)</strong></p><p>The Contractor shall:</p><ul><li>Avoid sensitive habitats and protected areas where feasible;</li><li>Prohibit hunting, poaching, and disturbance of wildlife by workers;</li><li>Implement a <strong>&ldquo;no-go&rdquo; policy</strong> in ecologically sensitive zones;</li><li>Immediately report any encounters with endangered species to authorities.</li></ul><p>&nbsp;</p><p><strong>e) Management of Construction Sites and Camps</strong></p><p>The Contractor shall:</p><ul><li>Ensure proper sanitation facilities are provided;</li><li>Prevent pollution from worker camps (wastewater, solid waste);</li><li>Avoid location of camps in environmentally sensitive areas;</li><li>Restore all temporary sites after demobilization.</li></ul><p>&nbsp;</p><p><strong>f) Traffic and Transport Management (ESS4 link)</strong></p><p>The Contractor shall:</p><ul><li>Minimize environmental and community impacts from transport activities;</li><li>Avoid fuel spills and dust generation along access roads;</li><li>Maintain vehicles to prevent leaks and emissions.</li></ul><p>&nbsp;</p><p><strong>g) Chance Finds Procedure (ESS8 link)</strong></p><p>In the event of chance finds (cultural or natural heritage):</p><ul><li>Stop work immediately;</li><li>Secure the site;</li><li>Notify relevant authorities;</li><li>Resume work only upon clearance.</li></ul><p>&nbsp;</p><p><strong>h) Environmental Training and Awareness</strong></p><p>The Contractor shall:</p><ul><li>Provide environmental induction training to all workers;</li><li>Conduct toolbox talks on environmental protection;</li><li>Ensure staff understand ESMP and CESMP requirements.</li></ul><p>&nbsp;</p><p><strong>i) Emergency Preparedness and Response</strong></p><p>The Contractor shall:</p><ul><li>Prepare environmental emergency response procedures;</li><li>Ensure availability of spill response equipment;</li><li>Train workers on emergency response actions.</li></ul><p>&nbsp;</p><p><strong>7. OCCUPATIONAL HEALTH &amp; SAFETY REQUIREMENTS </strong></p><p><strong><em>Health, Safety plan and Coordination </em></strong></p><p>The Contractor shall be fully responsible for ensuring the safety and health of all workmen and other persons in or around the works site. All activities shall be carried out in compliance with national legislation, OCHSIP, World Bank ESF, (ESS 2 and ESS 4) in accordance with the existing legislation.</p><p>&nbsp;</p><p>The Contractor shall prepare, submit, and implement a site-specific Occupational Health and Safety (OHS) Management Plan (SHE File) consistent with the OCHSIP, prior to commencement of works. The plan shall, at a minimum, include the following components:</p><p>&nbsp;</p><ul><li>Hazard identification and risk assessments</li><li>Prevention and protective measures</li><li>Safe work procedures and method statements</li><li>Training and competence</li><li>Incident reporting and management</li><li>Emergency preparedness and response</li><li>Occupational health and welfare measures</li><li>Community health and safety measures</li></ul><p>This plan must also be compliant with:</p><ul><li>The requirements of World Bank ESS 2 (Labour and Working Conditions and applicable provisions of ESS 4 (Community Health and Safety)</li><li>Application Eswatini National Legislation</li><li>EEC Integrated Management System</li><li>Occupational Community Health and Safety Implementation Plan (OCHSIP)</li><li>Good International Industrial Practices (ISO 9001, ISO 14001, ISO 45001, etc Any relevant Guidelines developed for the project and attached to this bidding document</li></ul><p>&nbsp;</p><p>Plan Scope and Content</p><p>The OHS Plan shall:</p><ul><li>Identify all project activities, associated risks, and mitigation measures, considering construction methods, equipment, environmental conditions, and site-specific factors;</li><li>Be aligned with the detailed construction schedule and address external influencing factors such as weather, traffic, and community interaction;</li><li>Include, at a minimum:</li><li>Organogram and roles/responsibilities for the safety team;</li><li>Incident reporting procedures and communication flow;</li><li>Emergency response procedures;</li><li>PPE specifications and usage requirements;</li><li>Site control and access management measures;</li><li>Training and communication arrangements;</li><li>Hazardous substances management (including MSDS);</li><li>Medical surveillance and occupational health provisions;</li><li>Pandemic and communicable disease contingency measures;</li><li>Coordination mechanisms with relevant authorities.</li></ul><p>The Draft OHS Plan submitted at tender stage shall demonstrate the Contractor&rsquo;s approach and capacity but may exclude detailed site-specific documentation (e.g., MSDS, equipment manuals). The Final OHS Plan, submitted prior to commencement of Works, shall be comprehensive and site-specific.</p><p><strong>8. Safety Management Personnel</strong></p><p>The Contractor shall appoint a qualified and experienced Safety and Health Coordinator (SHC) who shall:</p><p>Have full authority to enforce OHS requirements and to stop any unsafe work;</p><p>Be supported by an adequately resourced and competent safety team appropriate to the scale and risk of the Works.</p><p>The proposed SHC and safety team shall not be replaced or reduced without prior approval, and any replacement shall have equal or higher qualifications and experience.</p><p>&nbsp;</p><p>Evaluation of OHS Plan</p><p>The adequacy of the Contractor&rsquo;s OHS Plan will be evaluated during tender assessment, taking into account:</p><ul><li>Completeness and alignment with OCHSIP requirements;</li><li>Relevance to the specific scope of Works;</li><li>Competence and experience of the proposed SHC;</li><li>Adequacy of the safety organizational structure and resources.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>9. Social Standards Requirements</strong></p><p>The Contractor shall implement all social risk management measures in accordance with the World Bank Environmental and Social Framework (ESF), specifically <strong>ESS2 (Labour and Working Conditions), ESS4 (Community Health and Safety), ESS10 (Stakeholder Engagement and Information Disclosure) as well as the project&rsquo;s Gender Action Plan (GAP). </strong></p><p>The Contractor shall develop (in alignment with available project instruments) and comply with all project-specific instruments, including the:</p><ul><li>Labour Management Procedures (LMP)</li><li>Stakeholder Engagement Plan (SEP)</li><li>Resettlement Action Plan (RAP)</li><li>Grievance Redress Mechanism (GRM)</li><li>SEA/SH Action Plan</li></ul><p>These requirements shall be implemented as part of the Contractor&rsquo;s CESMP and maintained throughout the duration of the works</p><p>&nbsp;</p><p><strong>a) Labour and Working Conditions (ESS2)</strong></p><p>The Contractor shall:</p><ul><li>Ensure fair, transparent, and non-discriminatory employment practices</li><li>Actively encourage participation of women in both skilled and unskilled roles.</li><li>Provide workers with clear employment contracts outlining terms and conditions</li><li>Prohibit child labour, forced labour, and any form of exploitation</li><li>Establish and maintain a Workers&rsquo; Grievance Mechanism</li><li>Provide adequate welfare facilities, including sanitation, drinking water, and where applicable, suitable accommodation</li><li>Ensure all workers receive induction and regular training on:</li></ul><ul><li>Occupational health and safety</li><li>Code of conduct (including SEA/SH provisions)</li></ul><p><strong>b) Community Health and Safety (ESS4)</strong></p><p>The Contractor shall:</p><ul><li>Identify and assess risks and impacts to surrounding communities arising from construction activities</li><li>The Contractor shall carry out a pre-work site inspection and document the condition of properties through photographs before any construction activities begin in private properties.</li><li>Implement measures to manage the public&rsquo;s access to construction areas</li><li>Establish appropriate site security arrangements in line with principles of proportionality and good international practice</li><li>Prevent and respond to SEA/SH risks through awareness, codes of conduct, and reporting procedures</li><li>Maintain continuous communication/engagement with affected communities regarding ongoing works and risks</li><li>Respect property boundaries and prevent unnecessary damage to land, crops, or assets</li></ul><ul><li>The Contractor shall be responsible for compensating for any damage to property arising from its work or acts of negligence.</li></ul><p>&nbsp;</p><ul><li>Ensure that no work continues any damaged private property until compensation and measures have been completed.</li></ul><p>&nbsp;</p><ul><li>Ensure prompt reporting of any damage to property or assets during construction</li></ul><p><strong>d) Stakeholder Engagement and Information Disclosure (ESS10)</strong></p><p>The Contractor shall:</p><ul><li>Support implementation of the <strong>Stakeholder Engagement Plan (SEP)</strong></li><li>The Contractor shall engage and hold introductory consultations with traditional authorities in all communities before initiating any construction activities.</li><li>Maintain open, transparent, and continuous engagement with all stakeholders, including local communities.</li><li>Document all forms of engagements with communities, private property owners and update the contractor SEP as and when necessary.</li><li>Provide timely information regarding construction schedules, potential impacts, and mitigation measures</li><li>Ensure accessibility of the <strong>Grievance Redress Mechanism (GRM)</strong> for communities and workers</li><li>Record, track, and respond to all grievances in a timely manner.</li><li>Participate in community meetings and consultations as required by the Client.</li></ul><p><strong>e) Grievance Management and Reporting</strong></p><p>The Contractor shall:</p><ul><li>Maintain registers for:<ul><li>Community grievances</li><li>Worker grievances</li><li>Social incidents (including SEA/SH incidents)</li></ul></li><li>Ensure all grievances are acknowledged, investigated, and resolved within agreed timeframes</li><li>Report all social incidents and grievances to the Employer as part of regular reporting</li></ul><p><strong>f) Monitoring and Compliance</strong></p><p>The Contractor shall:</p><ul><li>Assign a qualified Social Specialist responsible for social &amp; Gender compliance</li><li>Conduct regular monitoring and internal audits of social performance</li><li>Submit periodic reports detailing:<ul><li>Stakeholder engagement activities</li><li>Grievances received and resolved</li><li>Labour and community-related incidents and grievances</li><li>Include gender inclusion indicators in regular project reporting</li></ul></li><li>Implement corrective actions for any identified non-compliance within agreed timelines</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Contractor&rsquo;s Representative and Key Personnel</strong></p><p>The Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements:</p><p><strong>Contractor&rsquo;s Representative and</strong> <strong>Key Personnel</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:618px\"><tbody><tr><td style=\"border-bottom:2px solid black; border-left:2px solid black; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:60px\"><p><strong>Item No.</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:204px\"><p><strong>Position/specialization</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; width:183px\"><p><strong>Relevant academic qualifications</strong></p></td><td style=\"border-bottom:2px solid black; border-left:none; border-right:2px solid black; border-top:2px solid black; vertical-align:top; width:171px\"><p><strong>Minimum years of relevant work experience</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Contractor&rsquo;s Representative/ Project manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors in&nbsp; (Electrical Engineering)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>2.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Site Manager/ Construction Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Tele-Communication Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Protection Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>SCADA Specialist</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Diploma Electrical/Electronic Engineering;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>6.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Environmental and Social expert</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors/Masters in Environment Management, Sciences</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:60px\"><p>7.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:204px\"><p>Health and Safety officer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:183px\"><p>Bachelors in Environmental Sciences )/Any other degree with Occupational Health</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:171px\"><p>5</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Forms and Procedures</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Form of Completion Certificate</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>To: _________________________________</p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>Pursuant to GCC Clause 24 (Completion of the Facilities) of the General Conditions of the Contract entered into between yourselves and the Employer dated <em>_____________</em>, relating to the <em>____________________, </em>&nbsp;we hereby notify you that the following part(s) of the Facilities was (were) complete on the date specified below, and that, in accordance with the terms of the Contract, the Employer hereby takes over the said part(s) of the Facilities, together with the responsibility for care and custody and the risk of loss thereof on the date mentioned below.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Description of the Facilities or part thereof:&nbsp; <em>______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date of Completion:&nbsp; <em>__________________</em></p><p>However, you are required to complete the outstanding items listed in the attachment hereto as soon as practicable.</p><p>&nbsp;</p><p>This letter does not relieve you of your obligation to complete the execution of the Facilities in accordance with the Contract nor of your obligations during the Defect Liability Period.</p><p>&nbsp;</p><p>Very truly yours,</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Title</p><p>(Project Manager)<br /><strong>Form of Operational Acceptance Certificate</strong></p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p><em>_________________________________________</em></p><p>&nbsp;</p><p>To:&nbsp; <em>________________________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>&nbsp;</p><p>Pursuant to GCC Sub-Clause 25.3 (Operational Acceptance) of the General Conditions of the Contract entered into between yourselves and the Employer dated <em>_______________</em>, relating to the <em>___________________________________</em>, we hereby notify you that the Functional Guarantees of the following part(s) of the Facilities were satisfactorily attained on the date specified below.&nbsp;</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Description of the Facilities or part thereof:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date of Operational Acceptance:&nbsp; <em>_______________________</em></p><p>This letter does not relieve you of your obligation to complete the execution of the Facilities in accordance with the Contract nor of your obligations during the Defect Liability Period.</p><p>&nbsp;</p><p>Very truly yours,</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Title</p><p>(Project Manager)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Change Order Procedure and Forms</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>CONTENTS</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order Log</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; References for Changes</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>ANNEXES</p><p>&nbsp;</p><p>Annex 1&nbsp;&nbsp;&nbsp; Request for Change Proposal</p><p>Annex 2&nbsp;&nbsp;&nbsp; Estimate for Change Proposal</p><p>Annex 3&nbsp;&nbsp;&nbsp; Acceptance of Estimate</p><p>Annex 4&nbsp;&nbsp;&nbsp; Change Proposal</p><p>Annex 5&nbsp;&nbsp;&nbsp; Change Order</p><p>Annex 6&nbsp;&nbsp;&nbsp; Pending Agreement Change Order</p><p>Annex 7&nbsp;&nbsp;&nbsp; Application for Change Proposal</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Change Order Procedure</strong></p><p><strong>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General</strong></p><p>This section provides samples of procedures and forms for implementing changes in the Facilities during the performance of the Contract in accordance with GCC Clause 39 (Change in the Facilities) of the General Conditions.</p><p><strong>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order Log</strong></p><p>The Contractor shall keep an up-to-date Change Order Log to show the current status of Requests for Change and Changes authorized or pending, as Annex 8.&nbsp; Entries of the Changes in the Change Order Log shall be made to ensure that the log is up-to-date.&nbsp; The Contractor shall attach a copy of the current Change Order Log in the monthly progress report to be submitted to the Employer.</p><p><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; References for Changes</strong></p><p>(1)&nbsp;&nbsp;&nbsp; Request for Change as referred to in GCC Clause 39 shall be serially numbered CR-X-nnn.</p><p>(2)&nbsp;&nbsp;&nbsp; Estimate for Change Proposal as referred to in GCC Clause 39 shall be serially numbered CN-X-nnn.</p><p>(3)&nbsp;&nbsp;&nbsp; Acceptance of Estimate as referred to in GCC Clause 39 shall be serially numbered CA-X-nnn.</p><p>(4)&nbsp;&nbsp;&nbsp; Change Proposal as referred to in GCC Clause 39 shall be serially numbered CP-X-nnn.</p><p>(5)&nbsp;&nbsp;&nbsp; Change Order as referred to in GCC Clause 39 shall be serially numbered CO-X-nnn.</p><p>Note:&nbsp;&nbsp; (a)&nbsp;&nbsp;&nbsp; Requests for Change issued from the Employer&rsquo;s Home Office and the Site representatives of the Employer shall have the following respective references:</p><p>&nbsp;</p><p>Home Office&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CR-H-nnn</p><p>Site&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CR-S-nnn</p><p>&nbsp;</p><p>(b)&nbsp;&nbsp;&nbsp; The above number &ldquo;nnn&rdquo; is the same for Request for Change, Estimate for Change Proposal, Acceptance of Estimate, Change Proposal and Change Order.</p><p>&nbsp;</p><p><strong>Annex 1.&nbsp; Request for Change Proposal</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>____________________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>______________________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_________________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>With reference to the captioned Contract, you are requested to prepare and submit a Change Proposal for the Change noted below in accordance with the following instructions within <em>_______________ </em>days of the date of this letter<em>____________________</em>.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No. __________________</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>_______________________________</em></p><p>Contractor (by Application for Change Proposal No. <em>_______</em>[12]:&nbsp;</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_________________________________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of equipment related to the requested Change:&nbsp; <em>_____________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference drawings and/or technical documents for the request of Change:</p><p><u>Drawing No./Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Detailed conditions or special requirements on the requested Change:&nbsp; <em>________________</em></p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Terms and Conditions:</p><p>(a)&nbsp;&nbsp;&nbsp; Please submit your estimate to us showing what effect the requested Change will have on the Contract Price.</p><p>(b)&nbsp;&nbsp;&nbsp; Your estimate shall include your claim for the additional time, if any, for completion of the requested Change.</p><p>(c)&nbsp;&nbsp;&nbsp; If you have any opinion negative to the adoption of the requested Change in connection with the conformability to the other provisions of the Contract or the safety of the Plant or Facilities, please inform us of your opinion in your proposal of revised provisions.</p><p>(d)&nbsp;&nbsp;&nbsp; Any increase or decrease in the work of the Contractor relating to the services of its personnel shall be calculated.</p><p>(e)&nbsp;&nbsp;&nbsp; You shall not proceed with the execution of the work for the requested Change until we have accepted and confirmed the amount and nature in writing.</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 2.&nbsp; Estimate for Change Proposal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To: <em>______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_____________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>With reference to your Request for Change Proposal, we are pleased to notify you of the approximate cost of preparing the below-referenced Change Proposal in accordance with GCC Sub-Clause 39.2.1 of the General Conditions.&nbsp; We acknowledge that your agreement to the cost of preparing the Change Proposal, in accordance with GCC Sub-Clause 39.2.2, is required before estimating the cost for change work.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>____________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>__________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scheduled Impact of Change:&nbsp; <em>___________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cost for Preparation of Change Proposal:&nbsp; <em>_______________</em>[13]</p><p>(a)&nbsp;&nbsp;&nbsp; Engineering&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Amount)</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp; Engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs x <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr = &nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(ii)&nbsp;&nbsp;&nbsp; Draftsperson&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs x <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr =&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Sub-total&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total Engineering Cost&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(b)&nbsp;&nbsp;&nbsp; Other Cost&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total Cost (a) + (b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 3.&nbsp; Acceptance of Estimate</strong></p><p>&nbsp;</p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Attention:&nbsp; <em>________________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_____________________________</em></p><p>Contract Number:&nbsp; <em>___________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We hereby accept your Estimate for Change Proposal and agree that you should proceed with the preparation of the Change Proposal.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>___________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Estimate for Change Proposal No./Rev.:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Acceptance of Estimate No./Rev.:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other Terms and Conditions:&nbsp; In the event that we decide not to order the Change accepted, you shall be entitled to compensation for the cost of preparation of Change Proposal described in your Estimate for Change Proposal mentioned in para. 3 above in accordance with GCC Clause 39 of the General Conditions.</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name and Title of signatory)</p><p>&nbsp;</p><p><strong>Annex 4.&nbsp; Change Pr<strong>o</strong>posal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>In response to your Request for Change Proposal No. <em>_______________________________</em>, we hereby submit our proposal as follows:</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Proposal No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>[_______________________________</em></p><p>Contractor:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reasons for Change:&nbsp; <em>_______________________________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of Equipment related to the requested Change:&nbsp; <em>_______________________________</em></p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference drawings and/or technical documents for the requested Change:</p><p><u>Drawing/Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Estimate of increase/decrease to the Contract Price resulting from Change Proposal:[14]</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>(Amount)</u></p><p>&nbsp;</p><p>(a)&nbsp;&nbsp;&nbsp; Direct material&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(b)&nbsp;&nbsp;&nbsp; Major construction equipment&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(c)&nbsp;&nbsp;&nbsp; Direct field labor (Total <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;hrs)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(d)&nbsp;&nbsp;&nbsp; Subcontracts&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(e)&nbsp;&nbsp;&nbsp; Indirect material and labor&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; Site supervision&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(g)&nbsp;&nbsp;&nbsp; Head office technical staff salaries</p><p>Process engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Project engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Equipment engineer&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Procurement&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Draftsperson&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs @ <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;rate/hr&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u> hrs&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>(h)&nbsp;&nbsp;&nbsp; Extraordinary costs (computer, travel, etc.)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp; Fee for general administration, <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;% of Items&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(j)&nbsp;&nbsp;&nbsp;&nbsp; Taxes and customs duties&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Total lump sum cost of Change Proposal&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>(Sum of items (a) to (j))</em></p><p>Cost to prepare Estimate for Change Proposal&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>(Amount payable if Change is not accepted)</em></p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Additional time for Completion required due to Change Proposal</p><p>10.&nbsp;&nbsp;&nbsp; Effect on the Functional Guarantees</p><p>11.&nbsp;&nbsp;&nbsp; Effect on the other terms and conditions of the Contract</p><p>12.&nbsp;&nbsp;&nbsp; Validity of this Proposal:&nbsp; within <em>[Number]</em> days after receipt of this Proposal by the Employer</p><p>13.&nbsp;&nbsp;&nbsp; Other terms and conditions of this Change Proposal:</p><p>(a)&nbsp;&nbsp;&nbsp; You are requested to notify us of your acceptance, comments or rejection of this detailed Change Proposal within <em>______________ </em>days from your receipt of this Proposal.</p><p>(b)&nbsp;&nbsp;&nbsp; The amount of any increase and/or decrease shall be taken into account in the adjustment of the Contract Price.</p><p>(c)&nbsp;&nbsp;&nbsp; Contractor&rsquo;s cost for preparation of this Change Proposal:2</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 5.&nbsp; Change Order</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We approve the Change Order for the work specified in the Change Proposal (No. <em>_______</em>), and agree to adjust the Contract Price, Time for Completion and/or other conditions of the Contract in accordance with GCC Clause 39 of the General Conditions.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Request No./Rev.:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change Order No./Rev.:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Originator of Change:&nbsp;&nbsp;&nbsp; Employer:&nbsp; <em>_______________________________</em></p><p>Contractor:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Authorized Price:</p><p>Ref. No.:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <em>__________________________</em></p><p>Foreign currency portion <em>__________</em>&nbsp; plus Local currency portion <em>__________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adjustment of Time for Completion</p><p>None&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Increase <em>_________</em> days&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Decrease <em>_________</em> days</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other effects, if any</p><p>&nbsp;</p><p>&nbsp;</p><p>Authorized by:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer)</p><p>&nbsp;</p><p>Accepted by:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor)<br /><strong>Annex 6.&nbsp; Pending Agreement Change Order</strong></p><p>(Employer&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Attention:&nbsp; <em>_______________________________</em></p><p>Contract Name: <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>[_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>We instruct you to carry out the work in the Change Order detailed below in accordance with GCC Clause 39 of the General Conditions.</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Employer&rsquo;s Request for Change Proposal No./Rev.:&nbsp; <em>_______________________________</em>dated:&nbsp; <em>__________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Change Proposal No./Rev.:&nbsp; <em>________________________ </em>dated:&nbsp; <em>__________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities and/or Item No. of equipment related to the requested Change:&nbsp; <em>_______________________________</em></p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reference Drawings and/or technical documents for the requested Change:</p><p><u>Drawing/Document No.</u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Description</u></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adjustment of Time for Completion:</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other change in the Contract terms:</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Other terms and conditions:</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Employer&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annex 7.&nbsp; Application for Change Proposal</strong></p><p>(Contractor&rsquo;s Letterhead)</p><p>&nbsp;</p><p>To:&nbsp; <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date: <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attention:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Contract Name:&nbsp; <em>_______________________________</em></p><p>Contract Number:&nbsp; <em>_______________________________</em></p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen:</p><p>&nbsp;</p><p>We hereby propose that the below-mentioned work be treated as a Change in the Facilities.</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Title of Change:&nbsp; <em>_______________________________</em></p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application for Change Proposal No./Rev.: <em>_______________________________</em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; dated:&nbsp; <em>_______________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brief Description of Change:&nbsp; <em>_______________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reasons for Change:</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Order of Magnitude Estimation (in the currencies of the Contract):</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scheduled Impact of Change:</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Effect on Functional Guarantees, if any:</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Appendix:</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Contractor&rsquo;s Name)</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Signature)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Name of signatory)</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>(Title of signatory)</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Drawings</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Supplementary Information</strong></p><p><strong>The proposed locations of the auto-reclosers across the Eswatini Electricity Company network:</strong></p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>The coordinates existing locations of the Communication High Sites across the Eswatini Electricity Company network can be found in this link:</strong></p><p><strong>11kV Auto Reclosers</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>PART 3 &ndash; Conditions of Contract and Contract Forms</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:613px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:40px; width:613px\"><p><strong>Section VIII - General Conditions of Contract</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>Table of Clauses</strong></p><p>&nbsp;</p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contract and Interpretation. 193</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions. 193</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contract Documents. 196</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interpretation. 196</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communications. 198</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Law and Language. 198</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fraud and Corruption. 198</p><p><strong>B.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Subject Matter of Contract 199</strong></p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Facilities. 199</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Time for Commencement and Completion. 200</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Responsibilities. 200</p><p>10.&nbsp;&nbsp;&nbsp; Employer&rsquo;s Responsibilities. 204</p><p><strong>C.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payment 206</strong></p><p>11.&nbsp;&nbsp;&nbsp; Contract Price. 206</p><p>12.&nbsp;&nbsp;&nbsp; Terms of Payment 206</p><p>13.&nbsp;&nbsp;&nbsp; Securities. 206</p><p>14.&nbsp;&nbsp;&nbsp; Taxes and Duties. 208</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Intellectual Property. 209</strong></p><p>15.&nbsp;&nbsp;&nbsp; License/Use of Technical Information. 209</p><p>16.&nbsp;&nbsp;&nbsp; Confidential Information. 209</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Execution of the Facilities. 210</strong></p><p>17.&nbsp;&nbsp;&nbsp; Representatives. 210</p><p>18.&nbsp;&nbsp;&nbsp; Work Program.. 212</p><p>19.&nbsp;&nbsp;&nbsp; Subcontracting. 215</p><p>20.&nbsp;&nbsp;&nbsp; Design and Engineering. 216</p><p>21.&nbsp;&nbsp;&nbsp; Procurement 218</p><p>22.&nbsp;&nbsp;&nbsp; Installation. 220</p><p>23.&nbsp;&nbsp;&nbsp; Test and Inspection. 232</p><p>24.&nbsp;&nbsp;&nbsp; Completion of the Facilities. 234</p><p>25. &nbsp;&nbsp; Commissioning and Operational Acceptance. 236</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Guarantees and Liabilities. 239</strong></p><p>26.&nbsp;&nbsp;&nbsp; Completion Time Guarantee. 239</p><p>27.&nbsp;&nbsp;&nbsp; Defect Liability. 240</p><p>28.&nbsp;&nbsp;&nbsp; Functional Guarantees. 242</p><p>29.&nbsp;&nbsp;&nbsp; Patent Indemnity. 243</p><p>30.&nbsp;&nbsp;&nbsp; Limitation of Liability. 245</p><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Risk Distribution. 245</strong></p><p>31.&nbsp;&nbsp;&nbsp; Transfer of Ownership. 245</p><p>32.&nbsp;&nbsp;&nbsp; Care of Facilities. 246</p><p>33.&nbsp;&nbsp;&nbsp; Loss of or Damage to Property; Accident or Injury to Workers; Indemnification. 247</p><p>34.&nbsp;&nbsp;&nbsp; Insurance. 248</p><p>35.&nbsp;&nbsp;&nbsp; Unforeseen Conditions. 251</p><p>36.&nbsp;&nbsp;&nbsp; Change in Laws and Regulations. 252</p><p>37.&nbsp;&nbsp;&nbsp; Force Majeure. 252</p><p>38.&nbsp;&nbsp;&nbsp; War Risks. 254</p><p><strong>H.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change in Contract Elements. 255</strong></p><p>39.&nbsp;&nbsp;&nbsp; Change in the Facilities. 255</p><p>40.&nbsp;&nbsp;&nbsp; Extension of Time for Completion. 259</p><p>41.&nbsp;&nbsp;&nbsp; Suspension. 260</p><p>42.&nbsp;&nbsp;&nbsp; Termination. 262</p><p>43.&nbsp;&nbsp;&nbsp; Assignment 269</p><p>44. &nbsp;&nbsp; Export Restrictions. 269</p><p><strong>I.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Claims, Disputes and Arbitration. 269</strong></p><p>45.&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Claims. 269</p><p>46. &nbsp;&nbsp; Disputes and Arbitration. 271</p><p>47. &nbsp;&nbsp; Cyber Security. 275</p><p>&nbsp;</p><p><strong>General Conditions of Contract</strong></p><ol><li><strong>Contract and Interpretation</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:643px\"><tbody><tr><td style=\"height:174px; vertical-align:top; width:142px\"><p><strong>1.&nbsp;&nbsp;&nbsp; Definitions</strong></p></td><td colspan=\"3\" style=\"height:174px; vertical-align:top; width:501px\"><p>1.1&nbsp;&nbsp;&nbsp;&nbsp; The following words and expressions shall have the meanings hereby assigned to them:</p><p><strong>&ldquo;Contract&rdquo;</strong> means the Contract Agreement entered into between the Employer and the Contractor, together with the Contract Documents referred to therein; they shall constitute the Contract, and the term &ldquo;the Contract&rdquo; shall in all such documents be construed accordingly.</p><p><strong>&ldquo;Contract Documents&rdquo;</strong> means the documents listed in Article 1.1 (Contract Documents) of the Contract Agreement (including any amendments thereto).</p><p><strong>&ldquo;GCC&rdquo;</strong> means the General Conditions of Contract hereof.</p><p>&ldquo;<strong>PCC&rdquo;</strong> means the Particular Conditions of Contract.</p><p><strong>&ldquo;day&rdquo;</strong> means calendar day.</p><p><strong>&ldquo;year&rdquo;</strong> means 365 days.</p><p><strong>&ldquo;month&rdquo;</strong> means calendar month.</p><p>&ldquo;<strong>Party&rdquo;</strong> means the Employer or the Contractor, as the context requires, and &ldquo;Parties&rdquo; means both of them.</p><p><strong>&ldquo;Employer&rdquo;</strong> means the person <strong>named as such in the PCC</strong> and includes the legal successors or permitted assigns of the Employer.</p><p><strong>&ldquo;Project Manager&rdquo;</strong> means the person appointed by the Employer in the manner provided in GCC Sub-Clause 17.1 (Project Manager) hereof and <strong>named as such in the PCC</strong> to perform the duties delegated by the Employer.</p><p><strong>&ldquo;Contractor&rdquo;</strong> means the person(s) whose Bid to perform the Contract has been accepted by the Employer and is named as Contractor in the Contract Agreement, and includes the legal successors or permitted assigns of the Contractor.</p><p><strong>&ldquo;Contractor&rsquo;s Representative&rdquo;</strong> means any person nominated by the Contractor and approved by the Employer in the manner provided in GCC Sub-Clause 17.2 (Contractor&rsquo;s Representative and Construction Manager) hereof to perform the duties delegated by the Contractor.</p><p><strong>&ldquo;Construction Manager&rdquo;</strong> means the person appointed by the Contractor&rsquo;s Representative in the manner provided in GCC Sub-Clause 17.2.4.&nbsp;</p><p><strong>&ldquo;Subcontractor,&rdquo;</strong> including manufacturers, means any person to whom execution of any part of the Facilities, including preparation of any design or supply of any Plant, is sub-contracted directly or indirectly by the Contractor, and includes its legal successors or permitted assigns.</p><p><strong>&ldquo;Dispute Board&rdquo; (DB)</strong> means the person or persons named as such in the PCC appointed by agreement between the Employer and the Contractor to make a decision with respect to any dispute or difference between the Employer and the Contractor referred to him or her by the Parties pursuant to GCC Sub-Clause 46.1 (Dispute Board) hereof.</p><p><strong>&ldquo;The Bank&rdquo;</strong> means the financing institution <strong>named in the PCC.</strong></p><p><strong>&ldquo;Contract Price&rdquo;</strong> means the sum specified in Article 2.1 (Contract Price) of the Contract Agreement, subject to such additions and adjustments thereto or deductions therefrom, as may be made pursuant to the Contract.</p><p><strong>&ldquo;Facilities&rdquo;</strong> means the Plant to be supplied and installed, as well as all the Installation Services to be carried out by the Contractor under the Contract.</p><p><strong>&ldquo;Plant&rdquo;</strong> means permanent plant, equipment, machinery, apparatus, materials, articles and things of all kinds to be provided and incorporated in the Facilities by the Contractor under the Contract (including the spare parts to be supplied by the Contractor under GCC Sub-Clause 7.3 hereof), but does not include Contractor&rsquo;s Equipment.</p><p><strong>&ldquo;Installation Services&rdquo;</strong> means all those services ancillary to the supply of the Plant for the Facilities, to be provided by the Contractor under the Contract, such as transportation and provision of marine or other similar insurance, inspection, expediting, site preparation works (including the provision and use of Contractor&rsquo;s Equipment and the supply of all construction materials required), installation, testing, precommissioning, commissioning, operations, maintenance, the provision of operations and maintenance manuals, training, etc&hellip; as the case may require.</p><p><strong>&ldquo;Contractor&rsquo;s Equipment&rdquo;</strong> means all facilities, equipment, machinery, tools, apparatus, appliances or things of every kind required in or for installation, completion and maintenance of Facilities that are to be provided by the Contractor, but does not include Plant, or other things intended to form or forming part of the Facilities.</p><p><strong>&ldquo;Country of Origin&rdquo;</strong> means the countries and territories eligible under the rules of the Bank as further <strong>elaborated in the PCC.</strong></p><p><strong>&ldquo;Site&rdquo;</strong> means the land and other places upon which the Facilities are to be installed, and such other land or places as may be specified in the Contract as forming part of the Site.</p><p><strong>&ldquo;Effective Date&rdquo;</strong> means the date of fulfillment of all conditions stated in Article 3 (Effective Date) of the Contract Agreement, from which the Time for Completion shall be counted.</p><p><strong>&ldquo;Time for Completion&rdquo;</strong> means the time within which Completion of the Facilities as a whole (or of a part of the Facilities where a separate Time for Completion of such part has been prescribed) is to be attained, as referred to in GCC Clause 8 and in accordance with the relevant provisions of the Contract.</p><p><strong>&ldquo;Completion&rdquo;</strong> means that the Facilities (or a specific part thereof where specific parts are specified in the Contract) have been completed operationally and structurally and put in a tight and clean condition, that all work in respect of Precommissioning of the Facilities or such specific part thereof has been completed, and that the Facilities or specific part thereof are ready for Commissioning as provided in GCC Clause 24 (Completion) hereof.</p><p><strong>&ldquo;Precommissioning</strong>&rdquo; means the testing, checking and other requirements specified in the Employer&rsquo;s Requirements that are to be carried out by the Contractor in preparation for Commissioning as provided in GCC Clause 24 (Completion) hereof.</p><p><strong>&ldquo;Commissioning&rdquo;</strong> means operation of the Facilities or any part thereof by the Contractor following Completion, which operation is to be carried out by the Contractor as provided in GCC Sub-Clause 25.1 (Commissioning) hereof, for the purpose of carrying out Guarantee Test(s).</p><p><strong>&ldquo;Guarantee Test(s)&rdquo;</strong> means the test(s) specified in the Employer&rsquo;s Requirements to be carried out to ascertain whether the Facilities or a specified part thereof is able to attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, in accordance with the provisions of GCC Sub-Clause 25.2 (Guarantee Test) hereof.</p><p><strong>&ldquo;Operational Acceptance&rdquo;</strong> means the acceptance by the Employer of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor&rsquo;s fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.</p><p><strong>&ldquo;Defect Liability Period&rdquo;</strong> means the period of validity of the warranties given by the Contractor commencing at Completion of the Facilities or a part thereof, during which the Contractor is responsible for defects with respect to the Facilities (or the relevant part thereof) as provided in GCC Clause 27 (Defect Liability) hereof.</p><p><strong>&ldquo;ES&rdquo;</strong> means Environmental and Social (including Sexual Exploitation and Abuse (SEA), and Sexual Harassment (SH)).</p><p><strong>&ldquo;Sexual Exploitation and Abuse&rdquo; &ldquo;(SEA)&rdquo;</strong> means the following:</p><p><strong>Sexual Exploitation</strong> is defined as any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another.</p><p><strong>Sexual Abuse</strong> is defined as the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions;</p><p><strong>&ldquo;Sexual Harassment&rdquo; &ldquo;(SH)&rdquo;</strong> is defined as unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature by the Contractor&rsquo;s Personnel with other Contractor&rsquo;s Personnel or Employer&rsquo;s Personnel.</p><p><strong>&ldquo;Contractor&rsquo;s Personnel&rdquo;</strong> means<strong> </strong>all personnel whom the Contractor utilizes in the execution of the Contract, including the staff, labor and other employees of the Contractor and each Subcontractor; and any other personnel assisting the Contractor in the execution of the Contract; and</p><p><strong>&nbsp;&ldquo;Employer&rsquo;s Personnel&rdquo;</strong> means<strong> </strong>all staff, labor and other employees of the Project Manager and of the Employer<strong> </strong>engaged in fulfilling the Employer&rsquo;s obligations under the Contract; and any other personnel identified as Employer&rsquo;s Personnel, by a notice from the Employer to the Contractor.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>2.&nbsp;&nbsp;&nbsp; Contract Documents</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>2.1&nbsp;&nbsp;&nbsp;&nbsp; Subject to Article 1.2 (Order of Precedence) of the Contract Agreement, all documents forming part of the Contract (and all parts thereof) are intended to be correlative, complementary and mutually explanatory.&nbsp; The Contract shall be read as a whole.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>3.&nbsp;&nbsp;&nbsp; Interpretation</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>3.1&nbsp;&nbsp;&nbsp;&nbsp; In the Contract, except where the context requires otherwise:</p><ol><li>words indicating one gender include all genders;</li><li>words indicating the singular also include the plural and words indicating the plural also include the singular;</li><li>provisions including the word &ldquo;agree,&rdquo; &ldquo;agreed,&rdquo; or &ldquo;agreement&rdquo; require the agreement to be recorded in writing;</li><li>the word &ldquo;tender&rdquo; is synonymous with &ldquo;Bid,&rdquo; &ldquo;tenderer,&rdquo; with &ldquo;Bidder,&rdquo; and &ldquo;tender documents&rdquo; with &ldquo;Bidding &nbsp;Document,&rdquo; and</li><li>&ldquo;written&rdquo; or &ldquo;in writing&rdquo; means hand-written, type-written, printed or electronically made, and resulting in a permanent record.</li></ol><p>The marginal words and other headings shall not be taken into consideration in the interpretation of these Conditions.</p><p>3.2&nbsp;&nbsp;&nbsp;&nbsp; <u>Incoterms</u></p><p>Unless inconsistent with any provision of the Contract, the meaning of any trade term and the rights and obligations of Parties thereunder shall be as prescribed by <em>Incoterms</em>.</p><p>Incoterms means international rules for interpreting trade terms published by the International Chamber of Commerce (latest edition), 38 Cours Albert 1er, 75008 Paris, France.</p><p>3.3&nbsp;&nbsp;&nbsp;&nbsp; <u>Entire Agreement</u></p><p>Subject to GCC Sub-Clause 16.4 hereof, the Contract constitutes the entire agreement between the Employer and Contractor with respect to the subject matter of Contract and supersedes all communications, negotiations and agreements (whether written or oral) of Parties with respect thereto made prior to the date of Contract.</p><p>3.4&nbsp;&nbsp;&nbsp;&nbsp; <u>Amendment</u></p><p>No amendment or other variation of the Contract shall be effective unless it is in writing, is dated, expressly refers to the Contract, and is signed by a duly authorized representative of each Party hereto.</p><p>3.5&nbsp;&nbsp;&nbsp;&nbsp; <u>Independent Contractor</u></p><p>The Contractor shall be an independent contractor performing the Contract.&nbsp; The Contract does not create any agency, partnership, joint venture or other joint relationship between the Parties hereto. Subject to the provisions of the Contract, the Contractor shall be solely responsible for the manner in which the Contract is performed.&nbsp; All employees, representatives or Subcontractors engaged by the Contractor in connection with the performance of the Contract shall be under the complete control of the Contractor and shall not be deemed to be employees of the Employer, and nothing contained in the Contract or in any subcontract awarded by the Contractor shall be construed to create any contractual relationship between any such employees, representatives or Subcontractors and the Employer.</p><p>3.6&nbsp;&nbsp;&nbsp;&nbsp; <u>Non-Waiver</u></p><p>3.6.1&nbsp; Subject to GCC Sub-Clause 3.6.2 below, no relaxation, forbearance, delay or indulgence by either Party in enforcing any of the terms and conditions of the Contract or the granting of time by either Party to the other shall prejudice, affect or restrict the rights of that Party under the Contract, nor shall any waiver by either Party of any breach of Contract operate as waiver of any subsequent or continuing breach of Contract.</p><p>3.6.2&nbsp; Any waiver of a Party&rsquo;s rights, powers or remedies under the Contract must be in writing, must be dated and signed by an authorized representative of the Party granting such waiver, and must specify the right and the extent to which it is being waived.</p><p>3.7&nbsp;&nbsp;&nbsp;&nbsp; <u>Severability</u></p><p>If any provision or condition of the Contract is prohibited or rendered invalid or unenforceable, such prohibition, invalidity or unenforceability shall not affect the validity or enforceability of any other provisions and conditions of the Contract.</p><p>3.8&nbsp;&nbsp;&nbsp;&nbsp; <u>Country of Origin</u></p><p>&ldquo;Origin&rdquo; means the place where the plant and component parts thereof are mined, grown, produced or manufactured, and from which the services are provided. Plant components are produced when, through manufacturing, processing, or substantial or major assembling of components, a commercially recognized product results that is substantially different in its basic characteristics or in purpose or utility from its components.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>4.&nbsp;&nbsp;&nbsp; Communica&shy;tions</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>4.1&nbsp;&nbsp;&nbsp;&nbsp; Wherever these Conditions provide for the giving or issuing of approvals, certificates, consents, determinations, notices, requests and discharges, these communications shall be:</p><ol><li>in writing and delivered against receipt; and</li><li>delivered, sent or transmitted to the address for the recipient&rsquo;s communications as stated in the Contract Agreement.</li></ol><p>When a certificate is issued to a Party, the certifier shall send a copy to the other Party. When a notice is issued to a Party, by the other Party or the Project Manager, a copy shall be sent to the Project Manager or the other Party, as the case may be.</p></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>5.&nbsp;&nbsp;&nbsp; Law and Language</strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><p>5.1&nbsp;&nbsp;&nbsp;&nbsp; The Contract shall be governed by and interpreted in accordance with laws of the country <strong>specified in the PCC.</strong></p><ol><li><ol><li>The ruling language of the Contract shall be that <strong>stated in the PCC.</strong></li><li>The language for communications shall be the ruling language unless otherwise <strong>stated in the PCC.</strong></li></ol></li></ol></td></tr><tr><td style=\"vertical-align:top; width:142px\"><p><strong>6.&nbsp;&nbsp;&nbsp; Fraud and Corruption </strong></p></td><td colspan=\"3\" style=\"vertical-align:top; width:501px\"><ol><li><ol><li>The Bank requires compliance with the Bank&rsquo;s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG&rsquo;s Sanctions Framework, as set forth in Appendix B to the GCC.</li><li>The Employer requires the Contractor to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the Bidding process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee.</li></ol></li></ol></td></tr><tr><td colspan=\"4\" style=\"vertical-align:top; width:643px\"><ol><li><strong>Subject Matter of Contract</strong></li></ol></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>7.&nbsp;&nbsp;&nbsp; Scope of Facilities</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>7.1&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise expressly limited in the Employer&rsquo;s Requirements, the Contractor&rsquo;s obligations cover the provision of all Plant and the performance of all Installation Services required for the design, and the manufacture (including procurement, quality assurance, construction, installation, associated civil works, Precommissioning and delivery) of the Plant, and the installation, completion and commissioning of the Facilities in accordance with the plans, procedures, specifications, drawings, codes and any other documents as specified in the Section, Employer&rsquo;s Requirements.&nbsp; Such specifications include, but are not limited to, the provision of supervision and engineering services; the supply of labor, materials, equipment, spare parts (as specified in GCC Sub-Clause 7.3 below) and accessories; Contractor&rsquo;s Equipment; construction utilities and supplies; temporary materials, structures and facilities; transportation (including, without limitation, unloading and hauling to, from and at the Site); and storage, except for those supplies, works and services that will be provided or performed by the Employer, as set forth in the&nbsp; Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer.</p><p>7.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall, unless specifically excluded in the Contract, perform all such work and/or supply all such items and materials not specifically mentioned in the Contract but that can be reasonably inferred from the Contract as being required for attaining Completion of the Facilities as if such work and/or items and materials were expressly mentioned in the Contract.</p><p>7.3&nbsp;&nbsp;&nbsp;&nbsp; In addition to the supply of Mandatory Spare Parts included in the Contract, the Contractor agrees to supply spare parts required for the operation and maintenance of the Facilities for the period <strong>specified in the PCC</strong> and the provisions, if any, <strong>specified in the PCC. </strong>&nbsp;However, the identity, specifications and quantities of such spare parts and the terms and conditions relating to the supply thereof are to be agreed between the Employer and the Contractor, and the price of such spare parts shall be that given in Price Schedule No. 6, which shall be added to the Contract Price.&nbsp; The price of such spare parts shall include the purchase price therefor and other costs and expenses (including the Contractor&rsquo;s fees) relating to the supply of spare parts.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>8.&nbsp;&nbsp;&nbsp; Time for Commence&shy;ment and Completion</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>8.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall commence work on the Facilities within the period <strong>specified in the PCC</strong> and without prejudice to GCC Sub-Clauses 9.9 and 26.2 hereof, the Contractor shall thereafter proceed with the Facilities in accordance with the time schedule specified in the Appendix to the Contract Agreement titled Time Schedule.</p><p>8.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall attain Completion of the Facilities or of a part where a separate time for Completion of such part is specified in the Contract, within the time <strong>stated in the PCC </strong>or within such extended time to which the Contractor shall be entitled under GCC Clause 40 hereof.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"height:53px; vertical-align:top; width:153px\"><p><strong>9.&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Responsibilities</strong></p></td><td style=\"height:53px; vertical-align:top; width:489px\"><p>9.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall design, manufacture including associated purchases and/or subcontracting, install and complete the Facilities in accordance with the Contract. When completed, the Facilities should be fit for the purposes for which they are intended as defined in the Contract.</p><p>9.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor confirms that it has entered into this Contract on the basis of a proper examination of the data relating to the Facilities including any data as to boring tests provided by the Employer, and on the basis of information that the Contractor could have obtained from a visual inspection of the Site if access thereto was available and of other data readily available to it relating to the Facilities as of the date twenty-eight (28) days prior to Bid submission.&nbsp; The Contractor acknowledges that any failure to acquaint itself with all such data and information shall not relieve its responsibility for properly estimating the difficulty or cost of successfully performing the Facilities.</p><p>9.3&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which such authorities or undertakings require the Contractor to obtain in its name and which are necessary for the performance of the Contract, including, without limitation, visas for the Contractor&rsquo;s Personnel and entry permits for all imported Contractor&rsquo;s Equipment.&nbsp; The Contractor shall acquire all other permits, approvals and/or licenses that are not the responsibility of the Employer under GCC Sub-Clause 10.3 hereof and that are necessary for the performance of the Contract.</p><p>9.4&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall comply with all laws in force in the country where the Facilities are to be implemented.&nbsp; The laws will include all local, state, national or other laws that affect the performance of the Contract and bind upon the Contractor.&nbsp; The Contractor shall indemnify and hold harmless the Employer from and against any and all liabilities, damages, claims, fines, penalties and expenses of whatever nature arising or resulting from the violation of such laws by the Contractor or its personnel, including the Subcontractors and their personnel, but without prejudice to GCC Sub-Clause 10.1 hereof.</p><p>9.5&nbsp;&nbsp;&nbsp;&nbsp; Any Plant and Installation Services that will be incorporated in or be required for the Facilities and other supplies shall have their origin as specified under GCC Clause 1 (Country of Origin). Any subcontractors retained by the Contractor shall be from a country as specified in GCC Clause 1 (Country of Origin).</p><p>9.6&nbsp;&nbsp;&nbsp;&nbsp; If the Contractor is a joint venture, or association (JV) of two or more persons, all such persons shall be jointly and severally bound to the Employer for the fulfillment of the provisions of the Contract, and shall designate one of such persons to act as a leader with authority to bind the JV. The composition or the constitution of the JV shall not be altered without the prior consent of the Employer.</p><p>9.7&nbsp;&nbsp;&nbsp;&nbsp; Pursuant to paragraph 2.2 e. of Appendix B to the General Conditions the Contractor shall permit and shall cause its agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit, the Bank and/or persons appointed by the Bank to inspect the site and/or the accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have such accounts, records and other documents audited by auditors appointed by the Bank. The Contractor&rsquo;s and its Subcontractors&rsquo; and subconsultants&rsquo; attention is drawn to Sub-Clause 6.1 (Fraud and Corruption) which provides, inter alia, that acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank&rsquo;s prevailing sanctions procedures).</p><p>9.8 The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the PCC.</p><p>9.9&nbsp;&nbsp; Contractor&rsquo;s Environmental and Social Management Plan (C-ESMP)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>The Contractor shall not carry out mobilization to Site unless the Project Manager gives approval, an approval that &nbsp;shall not be unreasonably delayed, to the measures the Contractor proposes to address environmental and social risks and impacts including the code of conduct, in accordance with GCC Sub-Clause&nbsp; 22.4.</p><p>The Contractor shall submit, to the Project Manager for Review, any additional Management Strategies and Implementation Plans as are necessary to manage the ES risks and impacts of the Facilities. These Management Strategies and Implementation Plans collectively comprise the Contractor&rsquo;s Environmental and Social Management Plan (C-ESMP).</p><p>The Contractor shall review the C-ESMP, periodically (but not less than every six (6) months), and update it as required to ensure that it contains measures appropriate to the Facilities. The updated C-ESMP shall be submitted to the Project Manager for its approval.</p><p>9.10 &nbsp;Training of Contractor&rsquo;s Personnel</p><p>The Contractor shall provide appropriate training to relevant Contractor&rsquo;s Personnel on ES aspects of the Contract, including appropriate sensitization on prohibition of SEA and health and safety training referred to in GCC Sub-Clause 22.2.7.&nbsp;</p><p>As stated in the Employer&rsquo;s Requirements or as instructed by the Project Manager, the Contractor shall also allow appropriate opportunities for the relevant Contractor&rsquo;s Personnel to be trained on ES aspects of the Contract by the Employer&rsquo;s personnel and/or other personnel assigned by the Employer.</p><p>9.11 Stakeholder engagements</p><p>The Contractor shall provide relevant contract- related information, as the Employer and/or Project Manager may reasonably request to conduct contract stakeholder engagement. &ldquo;Stakeholder&rdquo; refers to individuals or groups who:</p><ol><li><ol><li><ol><li>are affected or likely to be affected by the Contract; and</li><li>may have an interest in the Contract.</li></ol></li></ol></li></ol><p>The Contractor may also directly participate in contract stakeholder engagements, as the Employer and/or Project Manager may reasonably request.</p><p>9.12&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Forced Labor</p><p>The Contractor, including its Subcontractors, shall not employ or engage forced labour. Forced labour consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.</p><p>No persons shall be employed or engaged who have been subject to trafficking. Trafficking in persons is defined as the recruitment, transportation, transfer, harbouring or receipt of persons by means of the threat or use of force or other forms of coercion, abduction, fraud, deception, abuse of power, or of a position of vulnerability, or of the giving or receiving of payments or benefits to achieve the consent of a person having control over another person, for the purposes of exploitation.</p><p>The Contractor shall also take measures to require its suppliers (other than Subcontractors) not to employ or engage forced labour including trafficked persons. If forced labour/trafficking cases are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.13&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Child Labor</u></p><p>The Contractor, including its Subcontractors, shall not employ or engage a child under the age of 14 unless the national law specifies a higher age (the minimum age).</p><p>The Contractor, including its Subcontractors, shall not employ or engage a child between the minimum age and the age of 18 in a manner that is likely to be hazardous, or to interfere with, the child&rsquo;s education, or to be harmful to the child&rsquo;s health or physical, mental, spiritual, moral, or social development.</p><p>The Contractor including its Subcontractors, shall only employ or engage children between the minimum age and the age of 18 after an appropriate risk assessment has been conducted by the Contractor with the Engineer&rsquo;s consent. The Contractor shall be subject to regular monitoring by the Project Manager that includes monitoring of health, working conditions and hours of work.</p><p>Work considered hazardous for children is work that, by its nature or the circumstances in which it is carried out, is likely to jeopardize the health, safety, or morals of children. Such work activities prohibited for children include work:</p><ol><li>with exposure to physical, psychological or sexual abuse;</li><li>underground, underwater, working at heights or in confined spaces;</li><li>with dangerous machinery, equipment or tools, or involving handling or transport of heavy loads;</li><li>in unhealthy environments exposing children to hazardous substances, agents, or processes, or to temperatures, noise or vibration damaging to health; or</li><li>under difficult conditions such as work for long hours, during the night or in confinement on the premises of the employer.</li></ol><p>The Contractor shall also take measures to require its suppliers (other than Subcontractors) not to employ or engage child labor. If child labor cases are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.14&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Serious Safety Issues</p><p>The Contractor, including its Subcontractors, shall comply with all applicable safety obligations. The Contractor shall also take measures to require its suppliers (other than Subcontractors) to adopt procedures and mitigation measures adequate to address safety issues related to their personnel. If serious safety issues are identified, the Contractor shall take measures to require the suppliers to take appropriate steps to remedy them. Where the supplier does not remedy the situation, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to manage such risks.</p><p>9.15&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Obtaining natural resource materials</u></p><p>The Contractor shall obtain natural resource materials&nbsp; from suppliers&nbsp; that can demonstrate, through compliance with the applicable verification&nbsp; and/ or certification requirements, that obtaining such materials is not contributing to the risk of significant conversion or significant degradation of natural or critical habitats such as unsustainably harvested wood products, gravel or sand extraction from riverbeds or beaches.</p><p>If a supplier cannot continue to demonstrate that obtaining such materials is not contributing to the risk of significant conversion or significant degradation of natural or critical habitats, the Contractor shall within a reasonable period substitute the supplier with a supplier that is able to demonstrate that they are not significantly adversely impacting the habitats.</p><p>9.16&nbsp;&nbsp; Site Signage</p><p>The Contractor shall not post and shall ensure that its Subcontractors/suppliers/manufacturers and Contractors&rsquo; Personnel shall not post, any signage on the Site, or in any other place where the Works will be carried out, except such signage as is required under the Contract, including by the Laws of the Country, or has been approved by the Employer. For the purposes of this sub-clause, signage shall include, inter alia, flags, billboards, advertising materials and any other similar item separately posted on the Site.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"vertical-align:top; width:153px\"><p><strong>10.&nbsp; Employer&rsquo;s Responsibilities</strong></p></td><td style=\"vertical-align:top; width:489px\"><p>10.1&nbsp;&nbsp; All information and/or data to be supplied by the Employer as described in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, shall be deemed to be accurate, except when the Employer expressly states otherwise.</p><p>10.2&nbsp;&nbsp; The Employer shall be responsible for acquiring and providing legal and physical possession of the Site and access thereto, and for providing possession of and access to all other areas reasonably required for the proper execution of the Contract, including all requisite rights of way, as specified in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer.&nbsp; The Employer shall give full possession of and accord all rights of access thereto on or before the date(s) specified in that Appendix.</p><p>10.3&nbsp;&nbsp; The Employer shall acquire and pay for all permits, approvals and/or licenses from all local, state or national government authorities or public service undertakings in the country where the Site is located which (a) such authorities or undertakings require the Employer to obtain in the Employer&rsquo;s name, (b) are necessary for the execution of the Contract, including those required for the performance by both the Contractor and the Employer of their respective obligations under the Contract, and (c) are specified in the&nbsp; Appendix&nbsp; (Scope of Works and Supply by the Employer).</p><p>10.4&nbsp;&nbsp; If requested by the Contractor, the Employer shall use its best endeavors to assist the Contractor in obtaining in a timely and expeditious manner all permits, approvals and/or licenses necessary for the execution of the Contract from all local, state or national government authorities or public service undertakings that such authorities or undertakings require the Contractor or Subcontractors or the personnel of the Contractor or Subcontractors, as the case may be, to obtain.</p><p>10.5&nbsp;&nbsp; Unless otherwise specified in the Contract or agreed upon by the Employer and the Contractor, the Employer shall provide sufficient, properly qualified operating and maintenance personnel; shall supply and make available all raw materials, utilities, lubricants, chemicals, catalysts, other materials and facilities; and shall perform all work and services of whatsoever nature, including those required by the Contractor to properly carry out Precommissioning, Commissioning and Guarantee Tests, all in accordance with the provisions of the&nbsp; Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, at or before the time specified in the program furnished by the Contractor under GCC Sub-Clause 18.2 hereof and in the manner thereupon specified or as otherwise agreed upon by the Employer and the Contractor.</p><p>10.6&nbsp;&nbsp; The Employer shall be responsible for the continued operation of the Facilities after Completion, in accordance with GCC Sub-Clause 24.8, and shall be responsible for facilitating the Guarantee Test(s) for the Facilities, in accordance with GCC Sub-Clause 25.2.</p><p>10.7&nbsp;&nbsp; All costs and expenses involved in the performance of the obligations under this GCC Clause 10 shall be the responsibility of the Employer, save those to be incurred by the Contractor with respect to the performance of Guarantee Tests, in accordance with GCC Sub-Clause 25.2.</p><p>10.8&nbsp;&nbsp; In the event that the Employer shall be in breach of any of his obligations under this Clause, the additional cost incurred by the Contractor in consequence thereof shall be determined by the Project Manager and added to the Contract Price.</p></td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:157px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:10px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:474px\">&nbsp;</td><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; width:1px\">&nbsp;</td></tr></tbody></table><ol><li><strong>Payment</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:234px; vertical-align:top; width:151px\"><p><strong>11.&nbsp; Contract Price</strong></p></td><td style=\"height:234px; vertical-align:top; width:486px\"><p>11.1&nbsp;&nbsp; The Contract Price shall be as specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement.</p><p>11.2&nbsp;&nbsp; Unless an adjustment clause is <strong>provided for in the PCC,</strong> the Contract Price shall be a firm lump sum not subject to any alteration, except in the event of a Change in the Facilities or as otherwise provided in the Contract.</p><p>11.3&nbsp;&nbsp; Subject to GCC Sub-Clauses 9.2, 10.1 and 35 hereof, the Contractor shall be deemed to have satisfied itself as to the correctness and sufficiency of the Contract Price, which shall, except as otherwise provided for in the Contract, cover all its obligations under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>12.&nbsp; Terms of Payment</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>12.1&nbsp;&nbsp; The Contract Price shall be paid as specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement and in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, which also outlines the procedures to be followed in making application for and processing payments.</p><p>12.2&nbsp;&nbsp; No payment made by the Employer herein shall be deemed to constitute acceptance by the Employer of the Facilities or any part(s) thereof.</p><p>12.3&nbsp;&nbsp; In the event that the Employer fails to make any payment by its respective due date or within the period set forth in the Contract, the Employer shall pay to the Contractor interest on the amount of such delayed payment at the rate(s) shown in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, for the period of delay until payment has been made in full, whether before or after judgment or arbitrage award.</p><p>12.4&nbsp;&nbsp; The currency or currencies in which payments are made to the Contractor under this Contract shall be specified in the Appendix to the Contract Agreement titled Terms and Procedures of Payment, subject to the general principle that payments will be made in the currency or currencies in which the Contract Price has been stated in the Contractor&rsquo;s Bid.</p><p>12.5&nbsp;&nbsp; <strong>As specified in the PCC</strong>, if the Contractor fails to perform its cyber security obligations under the Contract, an assessed amount, as determined by the Project Manager, may be withheld until the obligation has been performed.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>13.&nbsp; Securities</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>13.1&nbsp;&nbsp; <u>Issuance of Securities</u></p><p>The Contractor shall provide the securities specified below in favor of the Employer at the times, and in the amount, manner and form specified below.</p><p>13.2&nbsp;&nbsp; <u>Advance Payment Security</u></p><p>13.2.1 The Contractor shall, within twenty-eight (28) days of the notification of contract award, provide a security in an amount equal to the advance payment calculated in accordance with the Appendix to the Contract Agreement titled Terms and Procedures of Payment, and in the same currency or currencies.</p><p>13.2.2 The security shall be in the form provided in the Bidding documents or in another form acceptable to the Employer.&nbsp; The amount of the security shall be reduced in proportion to the value of the Facilities executed by and paid to the Contractor from time to time, and shall automatically become null and void when the full amount of the advance payment has been recovered by the Employer.&nbsp; The security shall be returned to the Contractor immediately after its expiration.</p><p>13.3&nbsp;&nbsp; <u>Performance Security</u></p><p>13.3.1 The Contractor shall, within twenty-eight (28) days of the notification of contract award, provide a security for the due performance of the Contract in the amount <strong>specified in the PCC.</strong></p><p>13.3.2 The Performance Security shall be denominated in the currency or currencies of the Contract, or in a freely convertible currency acceptable to the Employer, and shall be in the form provided in Section X, Contract Forms, corresponding to the type of bank guarantee stipulated by the Employer in the PCC, or in another form acceptable to the Employer.</p><p>13.3.3 Unless otherwise specified in the PCC, the security shall be reduced by half on the date of the Operational Acceptance. The Security shall become null and void, or shall be reduced pro rata to the Contract Price of a part of the Facilities for which a separate Time for Completion is provided, five hundred and forty (540) days after Completion of the Facilities or three hundred and sixty five (365) days after Operational Acceptance of the Facilities, whichever occurs first; provided, however, that if the Defects Liability Period has been extended on any part of the Facilities pursuant to GCC Sub-Clause 27.8 hereof, the Contractor shall issue an additional security in an amount proportionate to the Contract Price of that part.&nbsp; The security shall be returned to the Contractor immediately after its expiration, provided, however, that if the Contractor, pursuant to GCC Sub-Clause 27.10, is liable for an extended defect liability obligation, the Performance Security shall be extended for the period specified in the PCC pursuant to GCC Sub-Clause 27.10 and up to the amount specified in the PCC.</p><p>13.3.4 The Employer shall not make a claim under the Performance Security, except for amounts to which the Employer is entitled under the Contract. The Employer shall indemnify and hold the Contractor harmless against and from all damages, losses and expenses (including legal fees and expenses) resulting from a claim under the Performance Security to the extent to which the Employer was not entitled to make the claim.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>14.&nbsp; Taxes and Duties</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>14.1&nbsp;&nbsp; Except as otherwise specifically provided in the Contract, the Contractor shall bear and pay all taxes, duties, levies and charges assessed on the Contractor, its Subcontractors or their employees by all municipal, state or national government authorities in connection with the Facilities in and outside of the country where the Site is located.</p><p>14.2&nbsp;&nbsp; Notwithstanding GCC Sub-Clause 14.1 above, the Employer shall bear and promptly pay</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; all customs and import duties for the Plant specified in Price Schedule No. 1; and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; other domestic taxes such as, sales tax and value added tax (VAT) on the Plant specified in Price Schedules No. 1 and No. 2 and that is to be incorporated into the Facilities, and on the finished goods, imposed by the law of the country where the Site is located.</p><p>14.3&nbsp;&nbsp; If any tax exemptions, reductions, allowances or privileges may be available to the Contractor in the country where the Site is located, the Employer shall use its best endeavors to enable the Contractor to benefit from any such tax savings to the maximum allowable extent.</p><p>14.4&nbsp;&nbsp; For the purpose of the Contract, it is agreed that the Contract Price specified in Article 2 (Contract Price and Terms of Payment) of the Contract Agreement is based on the taxes, duties, levies and charges prevailing at the date twenty-eight (28) days prior to the date of Bid submission in the country where the Site is located (hereinafter called &ldquo;Tax&rdquo; in this GCC Sub-Clause 14.4).&nbsp; If any rates of Tax are increased or decreased, a new Tax is introduced, an existing Tax is abolished, or any change in interpretation or application of any Tax occurs in the course of the performance of Contract, which was or will be assessed on the Contractor, Subcontractors or their employees in connection with performance of the Contract, an equitable adjustment of the Contract Price shall be made to fully take into account any such change by addition to the Contract Price or deduction therefrom, as the case may be, in accordance with GCC Clause 36 hereof.</p></td></tr></tbody></table><ol><li><strong>Intellectual Property</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:637px\"><tbody><tr><td style=\"vertical-align:top; width:151px\"><p><strong>15.&nbsp; License/Use of Technical Information </strong></p></td><td style=\"vertical-align:top; width:486px\"><p>15.1&nbsp;&nbsp;&nbsp; For the operation and maintenance of the Plant, the Contractor hereby grants a non-exclusive and non-transferable license (without the right to sub-license) to the Employer under the patents, utility models or other industrial property rights owned by the Contractor or by a third Party from whom the Contractor has received the right to grant licenses thereunder, and shall also grant to the Employer a non-exclusive and non-transferable right (without the right to sub-license) to use the know-how and other technical information disclosed to the Employer under the Contract. Nothing contained herein shall be construed as transferring ownership of any patent, utility model, trademark, design, copyright, know-how or other intellectual property right from the Contractor or any third Party to the Employer.</p><p>15.2&nbsp;&nbsp; The copyright in all drawings, documents and other materials containing data and information furnished to the Employer by the Contractor herein shall remain vested in the Contractor or, if they are furnished to the Employer directly or through the Contractor by any third Party, including suppliers of materials, the copyright in such materials shall remain vested in such third Party.</p></td></tr><tr><td style=\"vertical-align:top; width:151px\"><p><strong>16.&nbsp; Confidential Information</strong></p></td><td style=\"vertical-align:top; width:486px\"><p>16.1&nbsp;&nbsp; The Employer and the Contractor shall keep confidential and shall not, without the written consent of the other Party hereto, divulge to any third Party any documents, data or other information furnished directly or indirectly by the other Party hereto in connection with the Contract, whether such information has been furnished prior to, during or following termination of the Contract.&nbsp; Notwithstanding the above, the Contractor may furnish to its Subcontractor(s) such documents, data and other information it receives from the Employer to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor under this GCC Clause 16.</p><p>16.2&nbsp;&nbsp; The Employer shall not use such documents, data and other information received from the Contractor for any purpose other than the operation and maintenance of the Facilities.&nbsp; Similarly, the Contractor shall not use such documents, data and other information received from the Employer for any purpose other than the design, procurement of Plant, construction or such other work and services as are required for the performance of the Contract.</p><p>16.3&nbsp;&nbsp; The obligation of a Party under GCC Sub-Clauses 16.1 and 16.2 above, however, shall not apply to that information which</p><p>(a)&nbsp;&nbsp; now or hereafter enters the public domain through no fault of that Party</p><p>(b)&nbsp;&nbsp; can be proven to have been possessed by that Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto</p><p>(c)&nbsp;&nbsp; otherwise lawfully becomes available to that Party from a third Party that has no obligation of confidentiality</p><p>(d) &nbsp;is being provided to the Bank.</p><p>16.4&nbsp;&nbsp; The above provisions of this GCC Clause 16 shall not in any way modify any undertaking of confidentiality given by either of the Parties hereto prior to the date of the Contract in respect of the Facilities or any part thereof.</p><p>16.5&nbsp;&nbsp; The provisions of this GCC Clause 16 shall survive termination, for whatever reason, of the Contract.</p></td></tr></tbody></table><ol><li><strong>Execution of the Facilities</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:636px\"><tbody><tr><td style=\"vertical-align:top; width:157px\"><p><strong>17.&nbsp; Representatives</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>17.1&nbsp;&nbsp; Project Manager</p><p>If the Project Manager is not named in the Contract, then within fourteen (14) days of the Effective Date, the Employer shall appoint and notify the Contractor in writing of the name of the Project Manager.&nbsp; The Employer may from time to time appoint some other person as the Project Manager in place of the person previously so appointed, and shall give a notice of the name of such other person to the Contractor without delay.&nbsp; No such appointment shall be made at such a time or in such a manner as to impede the progress of work on the Facilities.&nbsp; Such appointment shall only take effect upon receipt of such notice by the Contractor.&nbsp; The Project Manager shall represent and act for the Employer at all times during the performance of the Contract.&nbsp; All notices, instructions, orders, certificates, approvals and all other communications under the Contract shall be given by the Project Manager, except as herein otherwise provided.</p><p>All notices, instructions, information and other communications given by the Contractor to the Employer under the Contract shall be given to the Project Manager, except as herein otherwise provided.</p><p>17.2&nbsp;&nbsp; Contractor&rsquo;s Representative &amp; Construction Manager</p><p>17.2.1 If the Contractor&rsquo;s Representative is not named in the Contract, then within fourteen (14) days of the Effective Date, the Contractor shall appoint the Contractor&rsquo;s Representative and shall request the Employer in writing to approve the person so appointed.&nbsp; If the Employer makes no objection to the appointment within fourteen (14) days, the Contractor&rsquo;s Representative shall be deemed to have been approved.&nbsp; If the Employer objects to the appointment within fourteen (14) days giving the reason therefor, then the Contractor shall appoint a replacement within fourteen (14) days of such objection, and the foregoing provisions of this GCC Sub-Clause 17.2.1 shall apply thereto.</p><p>17.2.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor&rsquo;s Representative shall represent and act for the Contractor at all times during the performance of the Contract and shall give to the Project Manager all the Contractor&rsquo;s notices, instructions, information and all other communications under the Contract.</p><p>All notices, instructions, information and all other communications given by the Employer or the Project Manager to the Contractor under the Contract shall be given to the Contractor&rsquo;s Representative or, in its absence, its deputy, except as herein otherwise provided.</p><p>The Contractor shall not revoke the appointment of the Contractor&rsquo;s Representative without the Employer&rsquo;s prior written consent, which shall not be unreasonably withheld.&nbsp; If the Employer consents thereto, the Contractor shall appoint some other person as the Contractor&rsquo;s Representative, pursuant to the procedure set out in GCC Sub-Clause 17.2.1.</p><p>17.2.3&nbsp;&nbsp;&nbsp;&nbsp; The Contractor&rsquo;s Representative may, subject to the approval of the Employer which shall not be unreasonably withheld, at any time delegate to any person any of the powers, functions and authorities vested in him or her.&nbsp; Any such delegation may be revoked at any time.&nbsp; Any such delegation or revocation shall be subject to a prior notice signed by the Contractor&rsquo;s Representative, and shall specify the powers, functions and authorities thereby delegated or revoked.&nbsp; No such delegation or revocation shall take effect unless and until a copy thereof has been delivered to the Employer and the Project Manager.</p><p>Any act or exercise by any person of powers, functions and authorities so delegated to him or her in accordance with this GCC Sub-Clause 17.2.3 shall be deemed to be an act or exercise by the Contractor&rsquo;s Representative.</p><p>17.2.4&nbsp;&nbsp;&nbsp;&nbsp; From the commencement of installation of the Facilities at the Site until Completion, the Contractor&rsquo;s Representative shall appoint a suitable person as the Construction Manager.&nbsp; The Construction Manager shall supervise all work done at the Site by the Contractor and shall be present at the Site throughout normal working hours except when on leave, sick or absent for reasons connected with the proper performance of the Contract.&nbsp; Whenever the Construction Manager is absent from the Site, a suitable person shall be appointed to act as the Construction Manager&rsquo;s deputy.</p><p>17.2.5&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager may require the Contractor to remove (or cause to be removed) the Contractor&rsquo;s Representative or any other person employed by the Contractor in the execution of the Contract, who:</p><ol><li>persists in any misconduct or lack of care;</li><li>carries out duties incompetently or negligently;</li><li>fails to comply with any provision of the Contract;</li><li>persists in any conduct which is prejudicial to safety, health, or the protection of the environment;</li><li>based on reasonable evidence, is determined to have engaged in Fraud and Corruption during the execution of the Contract;</li><li>has been recruited from the Employer&rsquo;s Personnel in breach of GCC Sub-Clause 22.2.2;</li><li>undertakes behaviour which breaches the Code of Conduct (ES), as applicable;</li></ol><p>If appropriate, the Contractor shall then promptly appoint (or cause to be appointed) a suitable replacement with equivalent skills and experience.</p><p>Notwithstanding any requirement from the Project Manager to remove or cause to remove any person, the Contractor shall take immediate action as appropriate in response to any violation of (a) through (g) above. Such immediate action shall include removing (or causing to be removed) from the Site or other places where the Contract is being executed, any Contractor&rsquo;s Personnel who engages in (a), (b), (c), (d), (e) or (g) above or has been recruited as stated in (f) above..</p><p>17.2.6&nbsp;&nbsp;&nbsp;&nbsp; If any representative or person employed by the Contractor is removed in accordance with GCC Sub-Clause 17.2.5, the Contractor shall, where required, promptly appoint a suitable replacement with equivalent skills and experience.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>18.&nbsp; Work Program</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>18.1&nbsp;&nbsp; <u>Contractor&rsquo;s Organization</u></p><p>The Contractor shall supply to the Employer and the Project Manager a chart showing the proposed organization to be established by the Contractor for carrying out work on the Facilities within twenty-one (21) days of the Effective Date.&nbsp; The chart shall include the identities of the key personnel and the curricula vitae of such key personnel to be employed shall be supplied together with the chart.&nbsp; The Contractor shall promptly inform the Employer and the Project Manager in writing of any revision or alteration of such an organization chart.</p><p>18.2&nbsp;&nbsp; <u>Program of Performance</u></p><p>Within twenty-eight (28) days after the Effective Date, the Contractor shall submit to the Project Manager a detailed program of performance of the Contract, made in a form acceptable to the Project Manager and showing the sequence in which it proposes to design, manufacture, transport, assemble, install and precommission the Facilities, as well as the date by which the Contractor reasonably requires that the Employer shall have fulfilled its obligations under the Contract so as to enable the Contractor to execute the Contract in accordance with the program and to achieve Completion, Commissioning and Acceptance of the Facilities in accordance with the Contract.&nbsp; The program so submitted by the Contractor shall accord with the Time Schedule included in the Appendix to the Contract Agreement titled Time Schedule, and any other dates and periods specified in the Contract.&nbsp; The Contractor shall update and revise the program as and when appropriate or when required by the Project Manager, but without modification in the Times for Completion specified in the PCC pursuant to Sub-Clause 8.2 and any extension granted in accordance with GCC Clause 40, and shall submit all such revisions to the Project Manager.</p><p>18.3&nbsp;&nbsp; <u>Progress Report</u></p><p>The Contractor shall monitor progress of all the activities specified in the program referred to in GCC Sub-Clause 18.2 above, and supply a progress report to the Project Manager every month.</p><p>The progress report shall be in a form acceptable to the Project Manager and shall indicate: (a) percentage completion achieved compared with the planned percentage completion for each activity; and (b) where any activity is behind the program, giving comments and likely consequences and stating the corrective action being taken.</p><p>Unless otherwise stated in the Employer&rsquo;s Requirements, each progress report shall include the Environmental and Social (ES) metrics set out in Appendix C.</p><p><strong>If stated in the PCC</strong>, progress report shall include status of compliance to cyber security risks management, and any foreseeable cyber security risk and mitigation.</p><p>In addition to the progress reports, the Contractor shall inform the Project Manager immediately of any allegation, incident or accident in the Site,&nbsp; which has or is likely to have a significant adverse effect on the environment, the affected communities, the public, Employer&rsquo;s Personnel or Contractor&rsquo;s Personnel. This includes, but is not limited to, any incident or accident causing fatality or serious injury; significant adverse effects or damage to private property; any cyber security incidents <strong>as specified in the PCC</strong>; or any allegation of SEA and/or SH. In case of SEA and/or SH, while maintaining confidentiality as appropriate, the type of allegation (sexual exploitation, sexual abuse or sexual harassment), gender and age of the person who experienced the alleged incident should be included in the information.</p><p>The Contractor, upon becoming aware of the allegation, incident or accident, shall also immediately inform the Project Manager of any such incident or accident on the Subcontractors&rsquo; or suppliers&rsquo; premises relating to the Facilities &nbsp;which has or is likely to have a significant adverse effect on the environment, the affected communities, the public, Employer&rsquo;s Personnel, or Contractor&rsquo;s, its Subcontractors&rsquo; and suppliers&rsquo; personnel. The notification shall provide sufficient detail regarding such incidents or accidents. The Contractor shall provide full details of such incidents or accidents to the Project Manager within the timeframe agreed with the Project Manager.</p><p>The Contractor shall require its Subcontractors and suppliers to immediately notify the Contractor of any incidents or accidents referred to in this Subclause.</p><p>18.4&nbsp;&nbsp; <u>Progress of Performance</u></p><p>If at any time the Contractor&rsquo;s actual progress falls behind the program referred to in GCC Sub-Clause 18.2, or it becomes apparent that it will so fall behind, the Contractor shall, at the request of the Employer or the Project Manager, prepare and submit to the Project Manager a revised program, taking into account the prevailing circumstances, and shall notify the Project Manager of the steps being taken to expedite progress so as to attain Completion of the Facilities within the Time for Completion under GCC Sub-Clause 8.2, any extension thereof entitled under GCC Sub-Clause 40.1, or any extended period as may otherwise be agreed upon between the Employer and the Contractor.</p><p>18.5&nbsp;&nbsp; <u>Procedures</u></p><p>The Contract shall be executed in accordance with the Contract Documents including the procedures given in the Forms and Procedures of the Employer&rsquo;s Requirements.</p><p>The Contractor may execute the Contract in accordance with its own standard project execution plans and procedures to the extent that they do not conflict with the provisions contained in the Contract.<em> </em></p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>19.&nbsp; Subcontracting</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>19.1&nbsp;&nbsp; The Appendix to the Contract Agreement titled List of Major Items of Plant and Installation Services and List of Approved Subcontractors, specifies major items of supply or services and a list of approved Subcontractors against each item, including manufacturers.&nbsp; Insofar as no Subcontractors are listed against any such item, the Contractor shall prepare a list of Subcontractors for such item for inclusion in such list.&nbsp; The Contractor may from time to time propose any addition to or deletion from any such list.&nbsp; The Contractor shall submit any such list or any modification thereto to the Employer for its approval in sufficient time so as not to impede the progress of work on the Facilities. Submission by the Contractor, for addition of any Subcontractor not named in the Contract, shall also include the Subcontractor&rsquo;s declaration in accordance with Appendix D- Sexual exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Performance Declaration. Approval by the Employer for any of the Subcontractors shall not relieve the Contractor from any of its obligations, duties or responsibilities under the Contract.</p><p>19.2&nbsp;&nbsp; The Contractor shall select and employ its Subcontractors for such major items from those listed in the lists referred to in GCC Sub-Clause 19.1.</p><p>19.3&nbsp;&nbsp; For items or parts of the Facilities not specified in the Appendix to the Contract Agreement titled List of Major Items of Plant and Installation Services and List of Approved Subcontractors, the Contractor may employ such Subcontractors as it may select, at its discretion.</p><p>19.4&nbsp;&nbsp; Each sub-contract shall include provisions which would entitle the Employer to require the sub-contract to be assigned to the Employer under GCC 19.5 (if and when applicable), or in event of termination by the Employer under GCC 42.2.</p><p>19.5&nbsp;&nbsp; If a Subcontractor&#39;s obligations extend beyond the expiry date of the relevant Defects Liability Period and the<strong> </strong>Project Manager, prior to that date, instructs the Contractor to assign the benefits of such obligations to the Employer, then the Contractor shall do so.</p><p>19.6 The Contractor shall ensure that its Subcontractors execute the Facilities in accordance with the Contract, including complying with the relevant ES requirements and the obligations set out in GCC Sub-Clause 22.4.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>20.&nbsp; Design and Engineering</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>20.1&nbsp;&nbsp; <u>Specifications and Drawings</u></p><p>20.1.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall execute the basic and detailed design and the engineering work in compliance with the provisions of the Contract, or where not so specified, in accordance with good engineering practice.</p><p>The Contractor shall be responsible for any discrepancies, errors or omissions in the specifications, drawings and other technical documents that it has prepared, whether such specifications, drawings and other documents have been approved by the Project Manager or not, provided that such discrepancies, errors or omissions are not because of inaccurate information furnished in writing to the Contractor by or on behalf of the Employer.</p><p>20.1.2&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designated by or on behalf of the Employer, by giving a notice of such disclaimer to the Project Manager.</p><p>20.2&nbsp;&nbsp; <u>Codes and Standards</u></p><p>Wherever references are made in the Contract to codes and standards in accordance with which the Contract shall be executed, the edition or the revised version of such codes and standards current at the date twenty-eight (28) days prior to date of Bid submission shall apply unless otherwise specified.&nbsp; During Contract execution, any changes in such codes and standards shall be applied subject to approval by the Employer and shall be treated in accordance with GCC Clause 39.</p><p>20.3&nbsp;&nbsp; <u>Approval/Review of Technical Documents by Project Manager</u></p><p>20.3.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall prepare or cause its Subcontractors to prepare, and furnish to the Project Manager the documents listed in the&nbsp; Appendix to the Contract Agreement titled List of Documents for Approval or Review, for its approval or review as specified and in accordance with the requirements of GCC Sub-Clause 18.2 (Program of Performance).</p><p>Any part of the Facilities covered by or related to the documents to be approved by the Project Manager shall be executed only after the Project Manager&rsquo;s approval thereof.</p><p>GCC Sub-Clauses 20.3.2 through 20.3.7 shall apply to those documents requiring the Project Manager&rsquo;s approval, but not to those furnished to the Project Manager for its review only.</p><p>20.3.2&nbsp;&nbsp;&nbsp;&nbsp; Within fourteen (14) days after receipt by the Project Manager of any document requiring the Project Manager&rsquo;s approval in accordance with GCC Sub-Clause 20.3.1, the Project Manager shall either return one copy thereof to the Contractor with its approval endorsed thereon or shall notify the Contractor in writing of its disapproval thereof and the reasons therefor and the modifications that the Project Manager proposes.</p><p>If the Project Manager fails to take such action within the said fourteen (14) days, then the said document shall be deemed to have been approved by the Project Manager.</p><p>20.3.3&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager shall not disapprove any document, except on the grounds that the document does not comply with the Contract or that it is contrary to good engineering practice.</p><p>20.3.4&nbsp;&nbsp;&nbsp;&nbsp; If the Project Manager disapproves the document, the Contractor shall modify the document and resubmit it for the Project Manager&rsquo;s approval in accordance with GCC Sub-Clause 20.3.2. If the Project Manager approves the document subject to modification(s), the Contractor shall make the required modification(s), whereupon the document shall be deemed to have been approved.</p><p>20.3.5&nbsp;&nbsp;&nbsp;&nbsp; If any dispute or difference occurs between the Employer and the Contractor in connection with or arising out of the disapproval by the Project Manager of any document and/or any modification(s) thereto that cannot be settled between the Parties within a reasonable period, then such dispute or difference may be referred to a Dispute Board for determination in accordance with GCC Sub-Clause 46.1 hereof.&nbsp; If such dispute or difference is referred to a Dispute Board, the Project Manager shall give instructions as to whether and if so, how, performance of the Contract is to proceed.&nbsp; The Contractor shall proceed with the Contract in accordance with the Project Manager&rsquo;s instructions, provided that if the Dispute Board upholds the Contractor&rsquo;s view on the dispute and if the Employer has not given notice under GCC Sub-Clause 46.3 hereof, then the Contractor shall be reimbursed by the Employer for any additional costs incurred by reason of such instructions and shall be relieved of such responsibility or liability in connection with the dispute and the execution of the instructions as the Dispute Board shall decide, and the Time for Completion shall be extended accordingly.</p><p>20.3.6&nbsp;&nbsp;&nbsp;&nbsp; The Project Manager&rsquo;s approval, with or without modification of the document furnished by the Contractor, shall not relieve the Contractor of any responsibility or liability imposed upon it by any provisions of the Contract except to the extent that any subsequent failure results from modifications required by the Project Manager.</p><p>20.3.7&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall not depart from any approved document unless the Contractor has first submitted to the Project Manager<em> </em>an amended document and obtained the Project Manager&rsquo;s approval thereof, pursuant to the provisions of this GCC Sub-Clause 20.3.</p><p>If the Project Manager requests any change in any already approved document and/or in any document based thereon, the provisions of GCC Clause 39 shall apply to such request.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>21.&nbsp; Procurement</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>21.1&nbsp;&nbsp; <u>Plant </u></p><p>Subject to GCC Sub-Clause 14.2, the Contractor shall procure and transport all Plant in an expeditious and orderly manner to the Site.</p><p>21.2&nbsp;&nbsp; <u>Employer-Supplied Plant</u></p><p>If the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, provides that the Employer shall furnish any specific items to the Contractor, the following provisions shall apply:</p><p>21.2.1&nbsp;&nbsp;&nbsp;&nbsp; The Employer shall, at its own risk and expense, transport each item to the place on or near the Site as agreed upon by the Parties and make such item available to the Contractor at the time specified in the program furnished by the Contractor, pursuant to GCC Sub-Clause 18.2, unless otherwise mutually agreed.</p><p>21.2.2&nbsp;&nbsp;&nbsp;&nbsp; Upon receipt of such item, the Contractor shall inspect the same visually and notify the Project Manager of any detected shortage, defect or default.&nbsp; The Employer shall immediately remedy any shortage, defect or default, or the Contractor shall, if practicable and possible, at the request of the Employer, remedy such shortage, defect or default at the Employer&rsquo;s cost and expense.&nbsp; After inspection, such item shall fall under the care, custody and control of the Contractor.&nbsp; The provision of this GCC Sub-Clause 21.2.2 shall apply to any item supplied to remedy any such shortage or default or to substitute for any defective item, or shall apply to defective items that have been repaired.</p><p>21.2.3&nbsp;&nbsp;&nbsp;&nbsp; The foregoing responsibilities of the Contractor and its obligations of care, custody and control shall not relieve the Employer of liability for any undetected shortage, defect or default, nor place the Contractor under any liability for any such shortage, defect or default whether under GCC Clause 27 or under any other provision of Contract.</p><p>21.3&nbsp;&nbsp; <u>Transportation</u></p><p>21.3.1&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall at its own risk and expense transport all the materials and the Contractor&rsquo;s Equipment to the Site by the mode of transport that the Contractor judges most suitable under all the circumstances.</p><p>21.3.2&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise provided in the Contract, the Contractor shall be entitled to select any safe mode of transport operated by any person to carry the materials and the Contractor&rsquo;s Equipment.</p><p>21.3.3&nbsp;&nbsp;&nbsp;&nbsp; Upon dispatch of each shipment of materials and the Contractor&rsquo;s Equipment, the Contractor shall notify the Employer by telex, cable, facsimile or electronic means, of the description of the materials and of the Contractor&rsquo;s Equipment, the point and means of dispatch, and the estimated time and point of arrival in the country where the Site is located, if applicable, and at the Site.&nbsp; The Contractor shall furnish the Employer with relevant shipping documents to be agreed upon between the Parties.</p><p>21.3.4&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall be responsible for obtaining, if necessary, approvals from the authorities for transportation of the materials and the Contractor&rsquo;s Equipment to the Site.&nbsp; The Employer shall use its best endeavors in a timely and expeditious manner to assist the Contractor in obtaining such approvals, if requested by the Contractor.&nbsp; The Contractor shall indemnify and hold harmless the Employer from and against any claim for damage to roads, bridges or any other traffic facilities that may be caused by the transport of the materials and the Contractor&rsquo;s Equipment to the Site.</p><p>21.4&nbsp;&nbsp; <u>Customs Clearance</u></p><p>The Contractor shall, at its own expense, handle all imported materials and Contractor&rsquo;s Equipment at the point(s) of import and shall handle any formalities for customs clearance, subject to the Employer&rsquo;s obligations under GCC Sub-Clause 14.2, provided that if applicable laws or regulations require any application or act to be made by or in the name of the Employer, the Employer shall take all necessary steps to comply with such laws or regulations.&nbsp; In the event of delays in customs clearance that are not the fault of the Contractor, the Contractor shall be entitled to an extension in the Time for Completion, pursuant to GCC Clause 40.</p></td></tr><tr><td style=\"height:168px; vertical-align:top; width:157px\"><p><strong>22.&nbsp; Installation</strong></p></td><td style=\"height:168px; vertical-align:top; width:479px\"><p>22.1&nbsp;&nbsp; Setting Out/Supervision</p><p>22.1.1&nbsp;&nbsp;&nbsp;&nbsp; Bench Mark:&nbsp; The Contractor shall be responsible for the true and proper setting-out of the Facilities in relation to bench marks, reference marks and lines provided to it in writing by or on behalf of the Employer.</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; If, at any time during the progress of installation of the Facilities, any error shall appear in the position, level or alignment of the Facilities, the Contractor shall forthwith notify the Project Manager of such error and, at its own expense, immediately rectify such error to the reasonable satisfaction of the Project Manager.&nbsp; If such error is based on incorrect data provided in writing by or on behalf of the Employer, the expense of rectifying the same shall be borne by the Employer.</p><p>22.1.2&nbsp;&nbsp;&nbsp;&nbsp; Contractor&rsquo;s Supervision:&nbsp; The Contractor shall give or provide all necessary superintendence during the installation of the Facilities, and the Construction Manager or its deputy shall be constantly on the Site to provide full-time superintendence of the installation.&nbsp; The Contractor shall provide and employ only technical personnel who are skilled and experienced in their respective callings and supervisory staff who are competent to adequately supervise the work at hand.</p><p>22.2&nbsp;&nbsp; Labor:</p><p>22.2.1 Engagement of Staff and Labor</p><p>Except as otherwise stated in the &nbsp;Employer&rsquo;s Requirements, the Contractor shall make arrangements for the engagement of all staff and labor, local or otherwise, and for their payment, housing, feeding and transport.</p><p>The Contractor shall provide and employ on the Site in the installation of the Facilities such skilled, semi-skilled and unskilled labor as is necessary for the proper and timely execution of the Contract.&nbsp; The Contractor is encouraged to use local labor that has the necessary skills.</p><p>The Contractor shall be responsible for obtaining all necessary permit(s) and/or visa(s) from the appropriate authorities for the entry of all labor and personnel to be employed on the Site into the country where the Site is located. The Employer will, if requested by the Contractor, use his best endeavors in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national or government permission required for bringing in the Contractor&rsquo;s &nbsp;&nbsp;Personnel.</p><p>The Contractor shall at its own expense provide the means of repatriation to all of its Contractor&rsquo;s Personnel employed for the excution of the Contract at the Site or other places where the Installation Services are carried out to the place where they were recruited or to their domicile.&nbsp; It shall also provide suitable temporary maintenance of all such persons from the cessation of their employment on the Contract to the date programmed for their departure.&nbsp; In the event that the Contractor defaults in providing such means of transportation and temporary maintenance, the Employer may provide the same to such personnel and recover the cost of doing so from the Contractor.</p><p>The Contractor shall provide Contractor&rsquo;s Personnel employed for the execution of the Contract at the Site or other places where the Installation Services are carried out, relevant information and documentation that are clear and understandable regarding their terms and conditions of employment. The information and documentation shall set out their rights under relevant labor laws applicable to the Contractor&rsquo;s Personnel (which will include any applicable collective agreements), including their rights related to hours of work, wages, overtime, compensation and benefits, as well as those arising from any requirements in the &nbsp;Employer&rsquo;s Requirements. The Contractor&rsquo;s Personnel shall be informed when any material changes to their terms or conditions of employment occur.</p><p>22.2.2 Persons in the Service of Employer</p><p>The Contractor shall not recruit, or attempt to recruit, staff and labor from amongst the Employer&rsquo;s Personnel.</p><p>22.2.3 Labor Laws</p><p>The Contractor shall comply with all the relevant labor laws applicable to the Contractor&rsquo;s Personnel, including laws relating to their employment, health, safety, welfare, immigration and emigration, and shall allow them all their legal rights.</p><p>The Contractor shall at all times during the progress of the Contract use its best endeavors to prevent any unlawful, riotous or disorderly conduct or behavior by or amongst its employees and the labor of its Subcontractors.</p><p>The Contractor shall, in all dealings with its labor and the labor of its Subcontractors currently employed on or connected with the Contract, pay due regard to all recognized festivals, official holidays, religious or other customs and all local laws and regulations pertaining to the employment of labor.</p><p>22.2.4 Rates of Wages and Conditions of Labor</p><p>The Contractor shall pay rates of wages, and observe conditions of labor, which are not lower than those established for the trade or industry where the work is carried out. If no established rates or conditions are applicable, the Contractor shall pay rates of wages and observe conditions which are not lower than the general level of wages and conditions observed locally by employers whose trade or industry is similar to that of the Contractor.</p><p>The Contractor shall inform the Contractor&rsquo;s Personnel about:</p><ol><li>any deduction to their payment and the conditions of such deductions in accordance with the applicable laws or as stated in the Employer&rsquo;s Requirements; and</li><li>their liability to pay personal income taxes in the Country in respect of such of their salaries, wages, allowances and any benefits as are subject to tax under the laws of the Country for the time being in force.</li></ol><p>The Contractor shall perform such duties in regard to such deductions thereof as may be imposed on him by such laws.</p><p>Where required by applicable Laws or as stated in the Employer&rsquo;s Requirements, the Contractor and its Subcontarctors shall provide their&nbsp; personnel written notice of termination of employment and details of severance payments in a timely manner. The Contractor and its Subcontractors shall have paid their personnel (either directly or where appropriate for their benefit) all due wages and entitlements including, as applicable, social security benefits and pension contributions, on or before the end of their engagement/ employment.</p><p>22.2.5 Working Hours</p><p>&nbsp;&nbsp;&nbsp; No work shall be carried out on the Site on locally recognized days of rest, or outside the normal working hours stated in the PCC, unless:</p><p>(a) &nbsp;&nbsp;&nbsp; otherwise stated in the Contract,</p><p>(b) &nbsp;&nbsp;&nbsp; the Project Manager gives consent, or</p><p>(c) &nbsp;&nbsp;&nbsp; the work is unavoidable, or necessary for the protection of life or property or for the safety of the Facilities, in which case the Contractor shall immediately advise the Project Manager.</p><p>If and when the Contractor considers it necessary to carry out work at night or on public holidays so as to meet the Time for Completion and requests the Project Manager&rsquo;s consent thereto, the Project Manager shall not unreasonably withhold such consent.</p><p>This Sub-Clause shall not apply to any work which is customarily carried out by rotary or double-shifts.</p><p>22.2.6 Facilities for Staff and Labor</p><p>Except as otherwise stated in the Employer&rsquo;s Requirements, the Contractor shall provide and maintain all necessary accommodation and welfare facilities for the Contractor&rsquo;s Personnel employed for the execution of the Contract at the Site or other places where the Installation Services are carried out. The Contractor shall also provide facilities for the Employer&rsquo;s &nbsp;Personnel as stated in the Employer&rsquo;s Requirements.</p><p>If stated in the Employer&rsquo;s Requirements, the Contractor shall give access to or provide services that accommodate the physical, social and cultural needs of the Contractor&rsquo;s Personnel. The Contractor shall also provide similar facilities for the Employer&rsquo;s Personnel as stated in the Employer&rsquo;s Requirements.</p><p>The Contractor shall not permit any of the Contractor&rsquo;s Personnel to maintain any temporary or permanent living quarters within the structures forming part of the Facilities.</p><p>22.2.7 Health and Safety</p><p>The Contractor shall at all times take all reasonable precautions to maintain the health and safety of the&nbsp; Contractor&rsquo;s Personnel employed for the execution of Installation Services at the Site (or other places in the country where the Site is located).</p><p>Subject to GCC Sub-Clause 9.9, the Contractor shall submit to the Project Manager for its approval a health and safety manual which sets out all the health and safety requirements under the Contract.</p><p>The health and safety manual shall be in addition to any other similar document required under applicable health and safety regulations and Laws.</p><p>The Contractor shall:</p><ol><li>comply with all applicable health and safety regulations and laws;</li><li>comply with all applicable health and safety obligations specified in the Contract;</li><li>develop and implement procedures to establish and maintain a safe working environment without risk to health at all workplaces, machinery, equipment and processes under the control of the Contractor, including control measures for chemical, physical and biological substances and agents;</li><li>provide health and safety training of the Contractor&rsquo;s Personnel as appropriate and maintain training records;</li><li>actively engage the Contractor&rsquo;s Personnel in promoting understanding, and methods for, implementation of health and safety requirements, as well as in providing information to such personnel, and provision of personal protective equipment without expense to the personnel;</li><li>put in place workplace processes for the Contractor&rsquo;s &nbsp;Personnel to report work situations that they believe are not safe or healthy, and to remove themselves from a work situation which they have reasonable justification to believe presents an imminent and serious danger to their life or health; Contractor&rsquo;s Personnel who remove themselves from such work situations shall not be required to return to work until necessary remedial action to correct the situation has been taken. Such personnel shall not be retaliated against or otherwise subject to reprisal or negative action for such reporting or removal;</li><li>in collaboration with local health authorities, ensure that medical staff, first aid facilities, sick bay and ambulance service are available at all times at the Site and at any accommodation for Contractor&rsquo;s and Employer&rsquo;s Personnel;</li><li>appoint an accident prevention officer at the Site, responsible for maintaining safety and protection against accidents. This person shall be qualified for this responsibility and shall have the authority to issue instructions and take protective measures to prevent accidents. Throughout the performance of the Contract, the Contractor shall provide whatever is required by this person to exercise this responsibility and authority;</li><li>put in place measures to avoid or minimize the potential for community exposure to water-borne, water-based, water-related, and vector-borne diseases;</li><li>put in place measures to be implemented to avoid or minimize the spread of communicable diseases (including transfer of Sexually Transmitted Diseases or Infections (STDs), such as HIV virus) and non-communicable diseases associated with the Installation Services, taking into consideration differentiated exposure to and higher sensitivity of vulnerable groups. This includes taking measures to avoid or minimize the transmission of communicable diseases that may be associated with the influx of temporary or permanent Contract-related labor;</li><li>have in place procedures for prevention, preparedness and response activities to be implemented in the case of an emergency event (i.e. an unanticipated incident, arising from both natural and man-made hazards, typically in the form of fire, explosions, leaks or spills, which may occur for a variety of different reasons including failure to implement operating procedures that are designed to prevent their occurrence, extreme weather or lack of early warning);</li><li>collaborate, as applicable,&nbsp; with the Employer&rsquo;s Personnel, any other contractors employed by the Employer, and/or personnel of any legally constituted public authorities and private utility companies that are employed in carrying out, on or near the site, of any work not included in the Contract, in applying the health and safety requirements. This is without prejudice to the responsibility of the relevant entities&nbsp; for the health and safety of their&nbsp; own&nbsp; personnel; and &nbsp;</li><li>put in place a system for regular review of health and safety performance and the working environment.</li></ol><p>22.2.8 Funeral Arrangements</p><p>In the event of the death of any of the Contractor&rsquo;s Personnel or accompanying members of their families, the Contractor shall be responsible for making the appropriate arrangements for their return or burial, unless otherwise specified in the PCC.</p><p>22.2.9 Records of Contractor&rsquo;s Personnel</p><p>The Contractor shall keep accurate records of the Contractor&rsquo;s Personnel, including the number of each class of Contractor&rsquo;s personnel on the Site and the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis in a form approved by the Project Manager and shall be available for inspection by the Project Manager until the Contractor has completed all work.</p><p>22.2.10 Supply of Foodstuffs</p><p>The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Employer&rsquo;s Requirements at reasonable prices for the Contractor&rsquo;s personnel for the purposes of or in connection with the Contract.</p><p>22.2.11 Supply of Water</p><p>The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor&rsquo;s personnel.</p><p>22.2.12 Measures against Insect and Pest Nuisance</p><p>The Contractor shall at all times take the necessary precautions to protect the Contractor&rsquo;s Personnel employed on the Site from insect and pest nuisance, and to reduce their danger to health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.</p><p>22.2.13 Alcoholic Liquor or Drugs</p><p>The Contractor shall not, otherwise than in accordance with the laws of the Country, import, sell, give barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift barter or disposal by Contractor&#39;s Personnel.</p><p>22.2.14 Arms and Ammunition</p><p>The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor&#39;s Personnel to do so.</p><p>22.2.15 Workers&rsquo; Organizations</p><p>In countries where the relevant labor laws recognize workers&rsquo; rights to form and to join workers&rsquo; organizations of their choosing and to bargain collectively without interference, the Contractor shall comply with such laws. In such circumstances, the role of legally established workers&rsquo; organizations and legitimate workers&rsquo; representatives will be respected, and they will be provided with information needed for meaningful negotiation in a timely manner. Where the relevant labor laws substantially restrict workers&rsquo; organizations, the Contractor shall enable alternative means for the Contractor&rsquo;s Personnel to express their grievances and protect their rights regarding working conditions and terms of employment. The Contractor shall not seek to influence or control these alternative means. The Contractor shall not discriminate or retaliate against the Contractor&rsquo;s Personnel who participate, or seek to participate, in such organizations and collective bargaining or alternative mechanisms. Workers&rsquo; organizations are expected to fairly represent the workers in the workforce.</p><p>22.2.16&nbsp; Non-Discrimination and Equal Opportunity</p><p>The Contractor shall not make decisions relating to the employment or treatment of Contractor&rsquo;s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor&rsquo;s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices.</p><p>Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure non-discrimination and equal opportunity, including for specific groups such as women, people with disabilities, migrant workers and children (of working age in accordance with GCC Sub-Clause 9.13).</p><p>22.2.17 &nbsp;Contractor&rsquo;s Personnel Grievance Mechanism</p><p>The Contractor shall have a grievance mechanism for the Contractor&rsquo;s Personnel, and where relevant the workers&rsquo; organizations stated in subclause 22.2.15, to raise workplace concerns. The grievance mechanism shall be proportionate to the nature, scale, risks and impacts of the Contract. The mechanism shall address concerns promptly, using an understandable and transparent process that provides timely feedback to those concerned in a language they understand, without any retribution, and shall operate in an independent and objective manner.</p><p>The Contractor&rsquo;s Personnel shall be informed of the grievance mechanism at the time of engagement for the Contract, and the measures put in place to protect them against any reprisal for its use. Measures will be put in place to make the grievance mechanism easily accessible to all Contractor&rsquo;s Personnel.</p><p>The grievance mechanism shall not impede access to other judicial or administrative remedies that might be available, or substitute for grievance mechanisms provided through collective agreements.</p><p>The grievance mechanism may utilize existing grievance mechanisms, providing that they are properly designed and implemented, address concerns promptly, and are readily accessible to such project workers. Existing grievance mechanisms may be supplemented as needed with Contract-specific arrangements.</p><p>22.3&nbsp;&nbsp; Contractor&rsquo;s Equipment</p><p>22.3.1 All Contractor&rsquo;s Equipment brought by the Contractor onto the Site shall be deemed to be intended to be used exclusively for the execution of the Contract.&nbsp; The Contractor shall not remove the same from the Site without the Project Manager&rsquo;s consent that such Contractor&rsquo;s Equipment is no longer required for the execution of the Contract.</p><p>22.3.2 Unless otherwise specified in the Contract, upon completion of the Facilities, the Contractor shall remove from the Site all Equipment brought by the Contractor onto the Site and any surplus materials remaining thereon.</p><p>22.3.3 The Employer will, if requested, use its best endeavors to assist the Contractor in obtaining any local, state or national government permission required by the Contractor for the export of the Contractor&rsquo;s Equipment imported by the Contractor for use in the execution of the Contract that is no longer required for the execution of the Contract.</p><p>22.4&nbsp;&nbsp; Site Regulations</p><p>The Employer and the Contractor shall establish Site regulations setting out the rules to be observed in the execution of the Contract at the Site and shall comply therewith.&nbsp; The Contractor shall prepare and submit to the Project Manager with a copy to the Employer, proposed Site regulations for the Project Manager&rsquo;s approval, which approval shall not be unreasonably withheld.</p><p>Such Site regulations shall include, but shall not be limited to, Code of Conduct for environmental and social aspectssubmitted as part of the Bid and agreed to by the Employer, , security arrangements in accordance with GCC Sub-Clause 22.8, safety of the Facilities, gate control, sanitation, medical care, and fire prevention.</p><p>The Contractor shall take all necessary measures to ensure that each Contractor&rsquo;s Personnel, employed for the execution of the Contract at the Site or other places where the Installation Services are carried out, is made aware of the Code of Conduct including specific behaviors that are prohibited, and understands the consequences of engaging in such prohibited behaviors.&nbsp;</p><p>These measures include providing instructions and documentation that can be understood by the Contractor&rsquo;s Personnel and seeking to obtain that person&rsquo;s signature acknowledging receipt of such instructions and/or documentation, as appropriate.</p><p>The Contractor shall also ensure that the Code of Conduct is visibly displayed in multiple locations on the Site and any other place where the Installation Services &nbsp;will be carried out, as well as in areas outside the Site accessible to the local community and project affected people. The posted Code of Conduct shall be provided in languages comprehensible to Contractor&rsquo;s Personnel, Employer&rsquo;s Personnel and the local community.</p><p>The Contractor&rsquo;s Management Strategy and Implementation Plans shall include appropriate processes for the Contractor to verify compliance with these obligations.</p><p>22.5&nbsp;&nbsp; Opportunities for Other Contractors</p><p>22.5.1 The Contractor shall, upon written request from the Employer or the Project Manager, give all reasonable opportunities for carrying out the work to any other contractors employed by the Employer on or near the Site.</p><p>22.5.2 If the Contractor, upon written request from the Employer or the Project Manager, makes available to other contractors any roads or ways the maintenance for which the Contractor is responsible, permits the use by such other contractors of the Contractor&rsquo;s Equipment, or provides any other service of whatsoever nature for such other contractors, the Employer shall fully compensate the Contractor for any loss or damage caused or occasioned by such other contractors in respect of any such use or service, and shall pay to the Contractor reasonable remuneration for the use of such equipment or the provision of such services.</p><p>22.5.3 The Contractor shall also so arrange to perform its work as to minimize, to the extent possible, interference with the work of other contractors.&nbsp; The Project Manager shall determine the resolution of any difference or conflict that may arise between the Contractor and other contractors and the workers of the Employer in regard to their work.</p><p>22.5.4 The Contractor shall notify the Project Manager promptly of any defects in the other contractors&rsquo; work that come to its notice, and that could affect the Contractor&rsquo;s work.&nbsp; The Project Manager shall determine the corrective measures, if any, required to rectify the situation after inspection of the Facilities.&nbsp; Decisions made by the Project Manager shall be binding on the Contractor.</p><p>22.6&nbsp;&nbsp; Emergency Work</p><p>If, by reason of an emergency arising in connection with and during the execution of the Contract, any protective or remedial work is necessary as a matter of urgency to prevent damage to the Facilities, the Contractor shall immediately carry out such work.</p><p>If the Contractor is unable or unwilling to do such work immediately, the Employer may do or cause such work to be done as the Employer may determine is necessary in order to prevent damage to the Facilities.&nbsp; In such event the Employer shall, as soon as practicable after the occurrence of any such emergency, notify the Contractor in writing of such emergency, the work done and the reasons therefor. If the work done or caused to be done by the Employer is work that the Contractor was liable to do at its own expense under the Contract, the reasonable costs incurred by the Employer in connection therewith shall be paid by the Contractor to the Employer.&nbsp; Otherwise, the cost of such remedial work shall be borne by the Employer.</p><p>22.7&nbsp;&nbsp; Site Clearance</p><p>22.7.1 Site Clearance in Course of Performance:&nbsp; In the course of carrying out the Contract, the Contractor shall keep the Site reasonably free from all unnecessary obstruction, store or remove any surplus materials, clear away any wreckage, rubbish or temporary works from the Site, and remove any Contractor&rsquo;s Equipment no longer required for execution of the Contract.</p><p>22.7.2 Clearance of Site after Completion:&nbsp; After Completion of all parts of the Facilities, the Contractor shall clear away and remove all wreckage, rubbish and debris of any kind from the Site, and shall leave the Site and Facilities in a clean and safe condition.</p><p>22.8&nbsp;&nbsp;&nbsp; Security of the Site</p><p>The Contractor shall be responsible for the security of the Site including providing and maintaining at its own expense all lighting, fencing, and watching when and where necessary for the proper execution and the protection of the Facilities, or for the safety of the owners and occupiers of adjacent property and for the safety of the public.</p><p>If required in the Employer&rsquo;s Requirements, the Contractor shall submit for the Project Manager&rsquo;s No-objection a security management plan that sets the security arrangements for the Site.</p><p>In making security arrangements, the Contractor shall be guided by applicable laws and any other requirements stated in the Employer&rsquo;s Requirements.</p><p>The Contractor shall (i) conduct appropriate background checks on any personnel retained to provide security; (ii) train the security personnel adequately (or determine that they are properly trained) in the use of force (and where applicable, firearms), and appropriate conduct towards Contractor&rsquo;s Personnel, Employer&rsquo;s personnel and affected communities; and (iii) require the security personnel to act within the applicable Laws and any requirements set out in the Employer&rsquo;s Reqquirements.</p><p>The Contractor shall not permit any use of force by security personnel in providing security except when used for preventive and defensive purposes in proportion to the nature and extent of the threat.</p><p>22.9 Protection of the Environment</p><p>The Contractor shall take all necessary measures to:</p><ol><li><ol><li><ol><li>protect the environment (both on and off the Site); and</li><li>limit damage and nuisance to people and property resulting from pollution, noise and other results of the Contractor&rsquo;s operations and/ or activities.</li></ol></li></ol></li></ol><p>The Contractor shall ensure that emissions, surface discharges, effluent and any other pollutants from the Contractor&rsquo;s activities shall exceed neither the values indicated in the Employer&rsquo;s Requirements, nor those prescribed by applicable laws.</p><p>In the event of damage to the environment, property and/or nuisance to people, on or off Site as a result of the Contractor&rsquo;s operations, the Contractor shall agree with the Project Manager the appropriate actions and time scale to remedy, as practicable, the damaged environment to its former condition. The Contractor shall implement such remedies at its cost to the satisfaction of the Project Manager.</p><p>22.10&nbsp; Traffic and Road Safety</p><p>The Contractor shall take all necessary safety measures to avoid the occurrence of incidents and injuries to any third party associated with the use of Contractor&rsquo;s Equipment on public roads or other public infrastructure.</p><p>The Contractor shall monitor and use road safety incidents and accidents reports to identify negative safety issues, and establish and implement necessary measures to resolve them.</p><p>22.11 Cultural Heritage Findings</p><p>All fossils, coins, articles of value or antiquity, structures, groups of structures, and other remains or items of geological, archaeological, paleontological, historical, architectural, religious interest found on the Site shall be placed under the care and custody of the Employer.</p><p>The Contractor shall:</p><ol><li>take all reasonable precautions, including fencing-off the area or site of the finding, to avoid further disturbance and prevent Contractor&rsquo;s Personnel or other persons from removing or damaging any of these findings;</li><li>as soon as practicable after discovery of any such finding, give a notice to the Project Manager, to give the Project Manager the opportunity to promptly inspect and/or investigate the finding before it is disturbed and to issue instructions for dealing with it;</li><li>train relevant Contractor&rsquo;s Personnel on the procedures for handling such findings; and</li><li>implement any other action consistent with the requirements of the Employer&rsquo;s Requirements and relevant laws.</li></ol><p>If the Contractor suffers delay and/or incurs extra costs from complying&nbsp; with the Project Manager instructions,&nbsp; the Contractor shall be entitled to an extension of time under GCC Sub-Clause 40.1, and the amount of such extra costs shall be added to the Contract Price.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>23.&nbsp; Test and Inspection</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>23.1&nbsp;&nbsp; The Contractor shall at its own expense carry out at the place of manufacture and/or on the Site all such tests and/or inspections of the Plant and any part of the Facilities as are specified in the Contract.</p><p>23.2&nbsp;&nbsp; The Employer and the Project Manager or their designated representatives shall be entitled to attend the aforesaid test and/or inspection, provided that the Employer shall bear all costs and expenses incurred in connection with such attendance including, but not limited to, all traveling and board and lodging expenses.</p><p>23.3&nbsp;&nbsp; Whenever the Contractor is ready to carry out any such test and/or inspection, the Contractor shall give a reasonable advance notice of such test and/or inspection and of the place and time thereof to the Project Manager.&nbsp; The Contractor shall obtain from any relevant third Party or manufacturer any necessary permission or consent to enable the Employer and the Project Manager or their designated representatives to attend the test and/or inspection.</p><p>23.4&nbsp;&nbsp; The Contractor shall provide the Project Manager with a certified report of the results of any such test and/or inspection.</p><p>If the Employer or Project Manager or their designated representatives fails to attend the test and/or inspection, or if it is agreed between the Parties that such persons shall not do so, then the Contractor may proceed with the test and/or inspection in the absence of such persons, and may provide the Project Manager with a certified report of the results thereof.</p><p>23.5&nbsp;&nbsp; The Project Manager may require the Contractor to carry out any test and/or inspection not required by the Contract, provided that the Contractor&rsquo;s reasonable costs and expenses incurred in the carrying out of such test and/or inspection shall be added to the Contract Price.&nbsp; Further, if such test and/or inspection impede the progress of work on the Facilities and/or the Contractor&rsquo;s performance of its other obligations under the Contract, due allowance will be made in respect of the Time for Completion and the other obligations so affected.</p><p>23.6&nbsp;&nbsp; If any Plant or any part of the Facilities fails to pass any test and/or inspection, the Contractor shall either rectify or replace such Plant or part of the Facilities and shall repeat the test and/or inspection upon giving a notice under GCC Sub-Clause 23.3.</p><p>23.7&nbsp;&nbsp; If any dispute or difference of opinion shall arise between the Parties in connection with or arising out of the test and/or inspection of the Plant or part of the Facilities that cannot be settled between the Parties within a reasonable period of time, it may be referred to an Dispute Board for determination in accordance with GCC Sub-Clause 46.3.</p><p>23.8&nbsp;&nbsp; The Contractor shall afford the Employer and the Project Manager, at the Employer&rsquo;s expense, access at any reasonable time to any place where the Plant are being manufactured or the Facilities are being installed, in order to inspect the progress and the manner of manufacture or installation, provided that the Project Manager shall give the Contractor a reasonable prior notice. Without prejudice to GCC Sub-Clause 9.7, as instructed by the Project Manager, the Contractor shall also afford other relevant entities (at the Employer&rsquo;s or their respective entities&rsquo; expense, as appropriate) access to the Facilities, to inspect progress and the manner of the execution of the Facilities, carry out environmental and social audit, as appropriate, or carry out any other duty as stated in the Employer&rsquo;s Requirements or as instructed by the Project Manager.</p><p>23.9&nbsp;&nbsp; The Contractor agrees that neither the execution of a test and/or inspection of Plant or any part of the Facilities, nor the attendance by the Employer or the Project Manager, nor the issue of any test certificate pursuant to GCC Sub-Clause 23.4, shall release the Contractor from any other responsibilities under the Contract.</p><p>23.10 No part of the Facilities or foundations shall be covered up on the Site without the Contractor carrying out any test and/or inspection required under the Contract.&nbsp; The Contractor shall give a reasonable notice to the Project Manager whenever any such parts of the Facilities or foundations are ready or about to be ready for test and/or inspection; such test and/or inspection and notice thereof shall be subject to the requirements of the Contract.</p><p>23.11 The Contractor shall uncover any part of the Facilities or foundations, or shall make openings in or through the same as the Project Manager may from time to time require at the Site, and shall reinstate and make good such part or parts.</p><p>If any parts of the Facilities or foundations have been covered up at the Site after compliance with the requirement of GCC Sub-Clause 23.10 and are found to be executed in accordance with the Contract, the expenses of uncovering, making openings in or through, reinstating, and making good the same shall be borne by the Employer, and the Time for Completion shall be reasonably adjusted to the extent that the Contractor has thereby been delayed or impeded in the performance of any of its obligations under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>24.&nbsp; Completion of the Facilities</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>24.1&nbsp;&nbsp; As soon as the Facilities or any part thereof has, in the opinion of the Contractor, been completed operationally and structurally and put in a tight and clean condition as specified in the Employer&rsquo;s Requirements, excluding minor items not materially affecting the operation or safety of the Facilities, the Contractor shall so notify the Employer in writing.</p><p>24.2&nbsp;&nbsp; Within seven (7) days after receipt of the notice from the Contractor under GCC Sub-Clause 24.1, the Employer shall supply the operating and maintenance personnel specified in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer for Precommissioning of the Facilities or any part thereof.</p><p>Pursuant to the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer, the Employer shall also provide, within the said seven (7) day period, the raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters required for Precommissioning of the Facilities or any part thereof.</p><p>24.3&nbsp;&nbsp; As soon as reasonably practicable after the operating and maintenance personnel have been supplied by the Employer and the raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters have been provided by the Employer in accordance with GCC Sub-Clause 24.2, the Contractor shall commence Precommissioning of the Facilities or the relevant part thereof in preparation for Commissioning, subject to GCC Sub-Clause 25.5.</p><p>24.4&nbsp;&nbsp; As soon as all works in respect of Precommissioning are completed and, in the opinion of the Contractor, the Facilities or any part thereof is ready for Commissioning, the Contractor shall so notify the Project Manager in writing.</p><p>24.5&nbsp;&nbsp; The Project Manager shall, within fourteen (14) days after receipt of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4, either issue a Completion Certificate in the form specified in the Employer&rsquo;s Requirements (Forms and Procedures), stating that the Facilities or that part thereof have reached Completion as of the date of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4, or notify the Contractor in writing of any defects and/or deficiencies.</p><p>If the Project Manager notifies the Contractor of any defects and/or deficiencies, the Contractor shall then correct such defects and/or deficiencies, and shall repeat the procedure described in GCC Sub-Clause 24.4.</p><p>If the Project Manager is satisfied that the Facilities or that part thereof have reached Completion, the Project Manager shall, within seven (7) days after receipt of the Contractor&rsquo;s repeated notice, issue a Completion Certificate stating that the Facilities or that part thereof have reached Completion as of the date of the Contractor&rsquo;s repeated notice.</p><p>If the Project Manager is not so satisfied, then it shall notify the Contractor in writing of any defects and/or deficiencies within seven (7) days after receipt of the Contractor&rsquo;s repeated notice, and the above procedure shall be repeated.</p><p>24.6&nbsp;&nbsp; If the Project Manager fails to issue the Completion Certificate and fails to inform the Contractor of any defects and/or deficiencies within fourteen (14) days after receipt of the Contractor&rsquo;s notice under GCC Sub-Clause 24.4 or within seven (7) days after receipt of the Contractor&rsquo;s repeated notice under GCC Sub-Clause 24.5, or if the Employer makes use of the Facilities or part thereof, then the Facilities or that part thereof shall be deemed to have reached Completion as of the date of the Contractor&rsquo;s notice or repeated notice, or as of the Employer&rsquo;s use of the Facilities, as the case may be.</p><p>24.7&nbsp;&nbsp; As soon as possible after Completion, the Contractor shall complete all outstanding minor items so that the Facilities are fully in accordance with the requirements of the Contract, failing which the Employer will undertake such completion and deduct the costs thereof from any monies owing to the Contractor.</p><p>24.8&nbsp;&nbsp; Upon Completion, the Employer shall be responsible for the care and custody of the Facilities or the relevant part thereof, together with the risk of loss or damage thereto, and shall thereafter take over the Facilities or the relevant part thereof.</p></td></tr><tr><td style=\"vertical-align:top; width:157px\"><p><strong>25. &nbsp; Commissioning and Operational Acceptance</strong></p></td><td style=\"vertical-align:top; width:479px\"><p>25.1&nbsp;&nbsp; <u>Commissioning</u></p><p>25.1.1 Commissioning of the Facilities or any part thereof shall be commenced by the Contractor immediately after issue of the Completion Certificate by the Project Manager, pursuant to GCC Sub-Clause 24.5, or immediately after the date of the deemed Completion, under GCC Sub-Clause 24.6.</p><p>25.1.2 The Employer shall supply the operating and maintenance personnel and all raw materials, utilities, lubricants, chemicals, catalysts, facilities, services and other matters required for Commissioning.</p><p>25.1.3 In accordance with the requirements of the Contract, the Contractor&rsquo;s and Project Manager&rsquo;s advisory personnel shall attend the Commissioning, including the Guarantee Test, and shall advise and assist the Employer.</p><p>25.2&nbsp;&nbsp; <u>Guarantee Test</u></p><p>25.2.1 Subject to GCC Sub-Clause 25.5, the Guarantee Test and repeats thereof shall be conducted by the Contractor during Commissioning of the Facilities or the relevant part thereof to ascertain whether the Facilities or the relevant part can attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees.&nbsp; The Employer shall promptly provide the Contractor with such information as the Contractor may reasonably require in relation to the conduct and results of the Guarantee Test and any repeats thereof.</p><p>25.2.2 If for reasons not attributable to the Contractor, the Guarantee Test of the Facilities or the relevant part thereof cannot be successfully completed within the period from the date of Completion <strong>specified in the PCC</strong> or any other period agreed upon by the Employer and the Contractor, the Contractor shall be deemed to have fulfilled its obligations with respect to the Functional Guarantees, and GCC Sub-Clauses 28.2 and 28.3 shall not apply.</p><p>25.3&nbsp;&nbsp; <u>Operational Acceptance</u></p><p>25.3.1 Subject to GCC Sub-Clause 25.4 below, Operational Acceptance shall occur in respect of the Facilities or any part thereof when</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Guarantee Test has been successfully completed and the Functional Guarantees are met; or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the Guarantee Test has not been successfully completed or has not been carried out for reasons not attributable to the Contractor within the period from the date of Completion specified in the PCC pursuant to GCC Sub-Clause 25.2.2 above or any other period agreed upon by the Employer and the Contractor; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the Contractor has paid the liquidated damages specified in GCC Sub-Clause 28.3 hereof; and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any minor items mentioned in GCC Sub-Clause 24.7 hereof relevant to the Facilities or that part thereof have been completed.</p><p>25.3.2 At any time after any of the events set out in GCC Sub-Clause 25.3.1 have occurred, the Contractor may give a notice to the Project Manager requesting the issue of an Operational Acceptance Certificate in the form provided in the Employer&rsquo;s Requirements (Forms and Procedures) in respect of the Facilities or the part thereof specified in such notice as of the date of such notice.</p><p>25.3.3 The Project Manager shall, after consultation with the Employer, and within seven (7) days after receipt of the Contractor&rsquo;s notice, issue an Operational Acceptance Certificate.</p><p>25.3.4 If within seven (7) days after receipt of the Contractor&rsquo;s notice, the Project Manager fails to issue the Operational Acceptance Certificate or fails to inform the Contractor in writing of the justifiable reasons why the Project Manager has not issued the Operational Acceptance Certificate, the Facilities or the relevant part thereof shall be deemed to have been accepted as of the date of the Contractor&rsquo;s said notice.</p><p>25.4&nbsp;&nbsp; <u>Partial Acceptance</u></p><p>25.4.1 If the Contract specifies that Completion and Commissioning shall be carried out in respect of parts of the Facilities, the provisions relating to Completion and Commissioning including the Guarantee Test shall apply to each such part of the Facilities individually, and the Operational Acceptance Certificate shall be issued accordingly for each such part of the Facilities.</p><p>25.4.2 If a part of the Facilities comprises facilities such as buildings, for which no Commissioning or Guarantee Test is required, then the Project Manager shall issue the Operational Acceptance Certificate for such facility when it attains Completion, provided that the Contractor shall thereafter complete any outstanding minor items that are listed in the Operational Acceptance Certificate.</p><p>25.5 Delayed Precommissioning and/or Guarantee Test</p><p>25.5.1 In the event that the Contractor is unable to proceed with the Precommissioning of the Facilities pursuant to Sub-Clause 24.3, or with the Guarantee Test pursuant to Sub-Clause 25.2, for reasons attributable to the Employer either on account of non availability of other facilities under the responsibilities of other contractor(s), or for reasons beyond the Contractor&rsquo;s control, the provisions leading to &ldquo;deemed&rdquo; completion of activities such as Completion, pursuant to GCC Sub-Clause 24.6, and Operational Acceptance, pursuant to GCC Sub-Clause 25.3.4, and Contractor&rsquo;s obligations regarding Defect Liability Period, pursuant to GCC Sub-Clause 27.2, Functional Guarantee, pursuant to GCC Clause 28, and Care of Facilities, pursuant to GCC Clause 32, and GCC Clause 41.1, Suspension, shall not apply.&nbsp; In this case, the following provisions shall apply.</p><p>25.5.2 When the Contractor is notified by the Project Manager that he will be unable to proceed with the activities and obligations pursuant to above Sub-Clause 25.5.1, the Contractor shall be entitled to the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Time of Completion shall be extended for the period of suspension without imposition of liquidated damages pursuant to GCC Sub-Clause 26.2;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; payments due to the Contractor in accordance with the provision specified in the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, which would not have been payable in normal circumstances due to non-completion of the subject activities, shall be released to the Contractor against submission of a security in the form of a bank guarantee of equivalent amount acceptable to the Employer, and which shall become null and void when the Contractor will have complied with its obligations regarding those payments, subject to the provision of Sub-Clause 25.5.3 below;</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the expenses towards the above security and extension of other securities under the contract, of which validity needs to be extended, shall be reimbursed to the Contractor by the Employer;</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; the additional charges towards the care of the Facilities pursuant to GCC Sub-Clause 32.1 shall be reimbursed to the Contractor by the Employer for the period between the notification mentioned above and the notification mentioned in Sub-Clause 25.5.4 below.&nbsp; The provision of GCC Sub-Clause 33.2 shall apply to the Facilities during the same period.</p><p>25.5.3 In the event that the period of suspension under above Sub-Clause 25.5.1 actually exceeds one hundred eighty (180) days, the Employer and Contractor shall mutually agree to any additional compensation payable to the Contractor.</p><p>25.5.4 When the Contractor is notified by the Project Manager that the Plant is ready for Precommissioning, the Contractor shall proceed without delay in performing Precommissioning in accordance with Clause 24.</p></td></tr></tbody></table><ol><li><strong>Guarantees and Liabilities</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:612px\"><tbody><tr><td style=\"vertical-align:top; width:156px\"><p><strong>26.&nbsp; Completion Time Guarantee</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>26.1&nbsp;&nbsp; The Contractor guarantees that it shall attain Completion of the Facilities (or a part for which a separate time for completion is specified) within the Time for Completion specified in the PCC pursuant to GCC Sub-Clause 8.2, or within such extended time to which the Contractor shall be entitled under GCC Clause 40&nbsp; hereof.</p><p>26.2&nbsp;&nbsp; If the Contractor fails to attain Completion of the Facilities or any part thereof within the Time for Completion or any extension thereof under GCC Clause 40, the Contractor shall pay to the Employer liquidated damages in the amount <strong>specified in the PCC</strong> as a percentage rate of the Contract Price or the relevant part thereof.&nbsp; The aggregate amount of such liquidated damages shall in no event exceed the amount <strong>specified as &ldquo;Maximum&rdquo; in the PCC</strong> as a percentage rate of the Contract Price.&nbsp; Once the &ldquo;Maximum&rdquo; is reached, the Employer may consider termination of the Contract, pursuant to GCC Sub-Clause 42.2.2.</p><p>Such payment shall completely satisfy the Contractor&rsquo;s obligation to attain Completion of the Facilities or the relevant part thereof within the Time for Completion or any extension thereof under GCC Clause 40.&nbsp; The Contractor shall have no further liability whatsoever to the Employer in respect thereof.</p><p>However, the payment of liquidated damages shall not in any way relieve the Contractor from any of its obligations to complete the Facilities or from any other obligations and liabilities of the Contractor under the Contract.</p><p>Save for liquidated damages payable under this GCC Sub-Clause 26.2, the failure by the Contractor to attain any milestone or other act, matter or thing by any date specified in the Appendix to the Contract Agreement titled Time Schedule, and/or other program of work prepared pursuant to GCC Sub-Clause 18.2 shall not render the Contractor liable for any loss or damage thereby suffered by the Employer.</p><p>26.3&nbsp;&nbsp; If the Contractor attains Completion of the Facilities or any part thereof before the Time for Completion or any extension thereof under GCC Clause 40, the Employer shall pay to the Contractor a bonus in the amount <strong>specified in the PCC. </strong>&nbsp;The aggregate amount of such bonus shall in no event exceed the amount <strong>specified as &ldquo;Maximum&rdquo; in the PCC.</strong></p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>27.&nbsp; Defect Liability</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>27.1&nbsp;&nbsp; The Contractor warrants that the Facilities or any part thereof shall be free from defects in the design, engineering, materials and workmanship of the Plant supplied and of the work executed.</p><p>27.2&nbsp;&nbsp; The Defect Liability Period shall be five hundred and forty (540) days from the date of Completion of the Facilities (or any part thereof) or one year from the date of Operational Acceptance of the Facilities (or any part thereof), whichever first occurs, unless specified otherwise in the PCC pursuant to GCC Sub-Clause 27.10.</p><p>If during the Defect Liability Period any defect should be found in the design, engineering, materials and workmanship of the Plant supplied or of the work executed by the Contractor, the Contractor shall promptly, in consultation and agreement with the Employer regarding appropriate remedying of the defects, and at its cost, repair, replace or otherwise make good as the Contractor shall determine at its discretion, such defect as well as any damage to the Facilities caused by such defect.&nbsp; The Contractor shall not be responsible for the repair, replacement or making good of any defect or of any damage to the Facilities arising out of or resulting from any of the following causes:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; improper operation or maintenance of the Facilities by the Employer;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; operation of the Facilities outside specifications provided in the Contract; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; normal wear and tear.</p><p>27.3&nbsp;&nbsp; The Contractor&rsquo;s obligations under this GCC Clause 27 shall not apply to:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any materials that are supplied by the Employer under GCC Sub-Clause 21.2, are normally consumed in operation, or have a normal life shorter than the Defect Liability Period stated herein;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any designs, specifications or other data designed, supplied or specified by or on behalf of the Employer or any matters for which the Contractor has disclaimed responsibility herein; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any other materials supplied or any other work executed by or on behalf of the Employer, except for the work executed by the Employer under GCC Sub-Clause 27.7.</p><p>27.4&nbsp;&nbsp; The Employer shall give the Contractor a notice stating the nature of any such defect together with all available evidence thereof, promptly following the discovery thereof.&nbsp; The Employer shall afford all reasonable opportunity for the Contractor to inspect any such defect.</p><p>27.5&nbsp;&nbsp; The Employer shall afford the Contractor all necessary access to the Facilities and the Site to enable the Contractor to perform its obligations under this GCC Clause 27.</p><p>The Contractor may, with the consent of the Employer, remove from the Site any Plant or any part of the Facilities that are defective if the nature of the defect, and/or any damage to the Facilities caused by the defect, is such that repairs cannot be expeditiously carried out at the Site.</p><p>27.6&nbsp;&nbsp; If the repair, replacement or making good is of such a character that it may affect the efficiency of the Facilities or any part thereof, the Employer may give to the Contractor a notice requiring that tests of the defective part of the Facilities shall be made by the Contractor immediately upon completion of such remedial work, whereupon the Contractor shall carry out such tests.</p><p>If such part fails the tests, the Contractor shall carry out further repair, replacement or making good, as the case may be, until that part of the Facilities passes such tests.&nbsp; The tests shall be agreed upon by the Employer and the Contractor.</p><p>27.7&nbsp;&nbsp; If the Contractor fails to commence the work necessary to remedy such defect or any damage to the Facilities caused by such defect within a reasonable time (which shall in no event be considered to be less than fifteen (15) days), the Employer may, following notice to the Contractor, proceed to do such work, and the reasonable costs incurred by the Employer in connection therewith shall be paid to the Employer by the Contractor or may be deducted by the Employer from any monies due the Contractor or claimed under the Performance Security.</p><p>27.8&nbsp;&nbsp; If the Facilities or any part thereof cannot be used by reason of such defect and/or making good of such defect, the Defect Liability Period of the Facilities or such part, as the case may be, shall be extended by a period equal to the period during which the Facilities or such part cannot be used by the Employer because of any of the aforesaid reasons.</p><p>27.9&nbsp;&nbsp; Except as provided in GCC Clauses 27 and 33, the Contractor shall be under no liability whatsoever and howsoever arising, and whether under the Contract or at law, in respect of defects in the Facilities or any part thereof, the Plant, design or engineering or work executed that appear after Completion of the Facilities or any part thereof, except where such defects are the result of the gross negligence, fraud, or criminal or willful action of the Contractor.</p><p>27.10 In addition, any such component of the Facilities, and during the period of time as may be <strong>specified in the PCC,</strong> shall be subject to an extended defect liability period.&nbsp; Such obligation of the Contractor shall be in addition to the defect liability period specified under GCC Sub-Clause 27.2.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>28.&nbsp; Functional Guarantees</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>28.1&nbsp;&nbsp; The Contractor guarantees that during the Guarantee Test, the Facilities and all parts thereof shall attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, subject to and upon the conditions therein specified.</p><p>28.2&nbsp;&nbsp; If, for reasons attributable to the Contractor, the minimum level of the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, are not met either in whole or in part, the Contractor shall at its cost and expense make such changes, modifications and/or additions to the Plant or any part thereof as may be necessary to meet at least the minimum level of such Guarantees.&nbsp; The Contractor shall notify the Employer upon completion of the necessary changes, modifications and/or additions, and shall request the Employer to repeat the Guarantee Test until the minimum level of the Guarantees has been met.&nbsp; If the Contractor eventually fails to meet the minimum level of Functional Guarantees, the Employer may consider termination of the Contract, pursuant to GCC Sub-Clause 42.2.2.</p><p>28.3&nbsp;&nbsp; If, for reasons attributable to the Contractor, the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, are not attained either in whole or in part, but the minimum level of the Functional Guarantees specified in the said Appendix to the Contract Agreement is met, the Contractor shall, at the Contractor&rsquo;s option, either</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; make such changes, modifications and/or additions to the Facilities or any part thereof that are necessary to attain the Functional Guarantees at its cost and expense, and shall request the Employer to repeat the Guarantee Test or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; pay liquidated damages to the Employer in respect of the failure to meet the Functional Guarantees in accordance with the provisions in the&nbsp; Appendix to the Contract Agreement titled Functional Guarantees.</p><p>28.4&nbsp;&nbsp; The payment of liquidated damages under GCC Sub-Clause 28.3, up to the limitation of liability specified in the Appendix to the Contract Agreement titled Functional Guarantees, shall completely satisfy the Contractor&rsquo;s guarantees under GCC Sub-Clause 28.3, and the Contractor shall have no further liability whatsoever to the Employer in respect thereof.&nbsp; Upon the payment of such liquidated damages by the Contractor, the Project Manager shall issue the Operational Acceptance Certificate for the Facilities or any part thereof in respect of which the liquidated damages have been so paid.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>29.&nbsp; Patent Indemnity</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>29.1&nbsp;&nbsp; The Contractor shall, subject to the Employer&rsquo;s compliance with GCC Sub-Clause 29.2, indemnify and hold harmless the Employer and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, which the Employer may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright or other intellectual property right registered or otherwise existing at the date of the Contract by reason of:&nbsp; (a) the installation of the Facilities by the Contractor or the use of the Facilities in the country where the Site is located; and (b) the sale of the products produced by the Facilities in any country.</p><p>Such indemnity shall not cover any use of the Facilities or any part thereof other than for the purpose indicated by or to be reasonably inferred from the Contract, any infringement resulting from the use of the Facilities or any part thereof, or any products produced thereby in association or combination with any other equipment, Plant or materials not supplied by the Contractor, pursuant to the Contract Agreement.</p><p>29.2&nbsp;&nbsp; If any proceedings are brought or any claim is made against the Employer arising out of the matters referred to in GCC Sub-Clause 29.1, the Employer shall promptly give the Contractor a notice thereof, and the Contractor may at its own expense and in the Employer&rsquo;s name conduct such proceedings or claim and any negotiations for the settlement of any such proceedings or claim.</p><p>If the Contractor fails to notify the Employer within twenty-eight (28) days after receipt of such notice that it intends to conduct any such proceedings or claim, then the Employer shall be free to conduct the same on its own behalf.&nbsp; Unless the Contractor has so failed to notify the Employer within the twenty-eight (28) day period, the Employer shall make no admission that may be prejudicial to the defense of any such proceedings or claim.</p><p>The Employer shall, at the Contractor&rsquo;s request, afford all available assistance to the Contractor in conducting such proceedings or claim, and shall be reimbursed by the Contractor for all reasonable expenses incurred in so doing.</p><p>29.3&nbsp;&nbsp; The Employer shall indemnify and hold harmless the Contractor and its employees, officers and Subcontractors from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, which the Contractor may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright or other intellectual property right registered or otherwise existing at the date of the Contract arising out of or in connection with any design, data, drawing, specification, or other documents or materials provided or designed by or on behalf of the Employer.</p></td></tr><tr><td style=\"vertical-align:top; width:156px\"><p><strong>30.&nbsp; Limitation of Liability</strong></p></td><td style=\"vertical-align:top; width:456px\"><p>30.1&nbsp;&nbsp; Except in cases of criminal negligence or willful misconduct,</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; neither Party shall be liable to the other Party, whether in contract, tort, or otherwise, for any indirect or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs, which may be suffered by the other Party in connection with the Contract, other than specifically provided as any obligation of the Party in the Contract, and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the aggregate liability of the Contractor to the Employer, whether under the Contract, in tort or otherwise, shall not exceed the amount resulting from the application of the multiplier specified in the PCC, to the Contract Price or, if a multiplier is not so specified, the total Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the Contractor to indemnify the Employer with respect to patent infringement.</p></td></tr></tbody></table><ol><li><strong>Risk Distribution</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>31.&nbsp; Transfer of Ownership</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>31.1&nbsp;&nbsp; Ownership of the Plant (including spare parts) to be imported into the country where the Site is located shall be transferred to the Employer upon loading on to the mode of transport to be used to convey the Plant from the country of origin to that country.</p><p>31.2&nbsp;&nbsp; Ownership of the Plant (including spare parts) procured in the country where the Site is located shall be transferred to the Employer when the Plant are brought on to the Site.</p><p>31.3&nbsp;&nbsp; Ownership of the Contractor&rsquo;s Equipment used by the Contractor and its Subcontractors in connection with the Contract shall remain with the Contractor or its Subcontractors.</p><p>31.4&nbsp;&nbsp; Ownership of any Plant in excess of the requirements for the Facilities shall revert to the Contractor upon Completion of the Facilities or at such earlier time when the Employer and the Contractor agree that the Plant in question are no longer required for the Facilities.</p><p>31.5&nbsp;&nbsp; Notwithstanding the transfer of ownership of the Plant, the responsibility for care and custody thereof together with the risk of loss or damage thereto shall remain with the Contractor pursuant to GCC Clause 32 (Care of Facilities) hereof until Completion of the Facilities or the part thereof in which such Plant are incorporated.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>32.&nbsp; Care of Facilities</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>32.1&nbsp;&nbsp; The Contractor shall be responsible for the care and custody of the Facilities or any part thereof until the date of Completion of the Facilities pursuant to GCC Clause 24 or, where the Contract provides for Completion of the Facilities in parts, until the date of Completion of the relevant part, and shall make good at its own cost any loss or damage that may occur to the Facilities or the relevant part thereof from any cause whatsoever during such period.&nbsp; The Contractor shall also be responsible for any loss or damage to the Facilities caused by the Contractor or its Subcontractors in the course of any work carried out, pursuant to GCC Clause 27.&nbsp; Notwithstanding the foregoing, the Contractor shall not be liable for any loss or damage to the Facilities or that part thereof caused by reason of any of the matters specified or referred to in paragraphs (a), (b) and (c) of GCC Sub-Clauses 32.2 and 38.1.</p><p>32.2&nbsp;&nbsp; If any loss or damage occurs to the Facilities or any part thereof or to the Contractor&rsquo;s temporary facilities by reason of</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; insofar as they relate to the country where the Site is located, nuclear reaction, nuclear radiation, radioactive contamination, pressure wave caused by aircraft or other aerial objects, or any other occurrences that an experienced contractor could not reasonably foresee, or if reasonably foreseeable could not reasonably make provision for or insure against, insofar as such risks are not normally insurable on the insurance market and are mentioned in the general exclusions of the policy of insurance, including War Risks and Political Risks, taken out under GCC Clause 34 hereof; or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any use or occupation by the Employer or any third Party other than a Subcontractor, authorized by the Employer of any part of the Facilities; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any use of or reliance upon any design, data or specification provided or designated by or on behalf of the Employer, or any such matter for which the Contractor has disclaimed responsibility herein,</p><p>the Employer shall pay to the Contractor all sums payable in respect of the Facilities executed, notwithstanding that the same be lost, destroyed or damaged, and will pay to the Contractor the replacement value of all temporary facilities and all parts thereof lost, destroyed or damaged.&nbsp; If the Employer requests the Contractor in writing to make good any loss or damage to the Facilities thereby occasioned, the Contractor shall make good the same at the cost of the Employer in accordance with GCC Clause 39.&nbsp; If the Employer does not request the Contractor in writing to make good any loss or damage to the Facilities thereby occasioned, the Employer shall either request a change in accordance with GCC Clause 39, excluding the performance of that part of the Facilities thereby lost, destroyed or damaged, or, where the loss or damage affects a substantial part of the Facilities, the Employer shall terminate the Contract pursuant to GCC Sub-Clause 42.1 hereof.</p><p>32.3&nbsp;&nbsp; The Contractor shall be liable for any loss of or damage to any Contractor&rsquo;s Equipment, or any other property of the Contractor used or intended to be used for purposes of the Facilities, except (i) as mentioned in GCC Sub-Clause 32.2 with respect to the Contractor&rsquo;s temporary facilities, and (ii) where such loss or damage arises by reason of any of the matters specified in GCC Sub-Clauses 32.2 (b) and (c) and 38.1.</p><p>32.4&nbsp;&nbsp; With respect to any loss or damage caused to the Facilities or any part thereof or to the Contractor&rsquo;s Equipment by reason of any of the matters specified in GCC Sub-Clause 38.1, the provisions of GCC Sub-Clause 38.3 shall apply.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>33.&nbsp; Loss of or Damage to Property; Accident or Injury to Workers; Indemnifica&shy;tion</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>33.1&nbsp;&nbsp; Subject to GCC Sub-Clause 33.3, the Contractor shall indemnify and hold harmless the Employer and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of whatsoever nature, including attorney&rsquo;s fees and expenses, in respect of the death or injury of any person or loss of or damage to any property other than the Facilities whether accepted or not, arising in connection with the supply and installation of the Facilities and by reason of the negligence of the Contractor or its Subcontractors, or their employees, officers or agents, except any injury, death or property damage caused by the negligence of the Employer, its contractors, employees, officers or agents.</p><p>33.2&nbsp;&nbsp; If any proceedings are brought or any claim is made against the Employer that might subject the Contractor to liability under GCC Sub-Clause 33.1, the Employer shall promptly give the Contractor a notice thereof and the Contractor may at its own expense and in the Employer&rsquo;s name conduct such proceedings or claim and any negotiations for the settlement of any such proceedings or claim.</p><p>If the Contractor fails to notify the Employer within twenty-eight (28) days after receipt of such notice that it intends to conduct any such proceedings or claim, then the Employer shall be free to conduct the same on its own behalf.&nbsp; Unless the Contractor has so failed to notify the Employer within the twenty-eight (28) day period, the Employer shall make no admission that may be prejudicial to the defense of any such proceedings or claim.</p><p>The Employer shall, at the Contractor&rsquo;s request, afford all available assistance to the Contractor in conducting such proceedings or claim, and shall be reimbursed by the Contractor for all reasonable expenses incurred in so doing.</p><p>33.3&nbsp;&nbsp; The Employer shall indemnify and hold harmless the Contractor and its employees, officers and Subcontractors from any liability for loss of or damage to property of the Employer, other than the Facilities not yet taken over, that is caused by fire, explosion or any other perils, in excess of the amount recoverable from insurances procured under GCC Clause 34, provided that such fire, explosion or other perils were not caused by any act or failure of the Contractor.</p><p>33.4&nbsp;&nbsp; The Party entitled to the benefit of an indemnity under this GCC Clause 33 shall take all reasonable measures to mitigate any loss or damage which has occurred.&nbsp; If the Party fails to take such measures, the other Party&rsquo;s liabilities shall be correspondingly reduced.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>34.&nbsp; Insurance</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>34.1&nbsp;&nbsp; To the extent specified in the Appendix to the Contract Agreement titled Insurance Requirements, the Contractor shall at its expense take out and maintain in effect, or cause to be taken out and maintained in effect, during the performance of the Contract, the insurances set forth below in the sums and with the deductibles and other conditions specified in the said Appendix.&nbsp; The identity of the insurers and the form of the policies shall be subject to the approval of the Employer, who should not unreasonably withhold such approval.</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; <u>Cargo Insurance During Transport</u></p><p>Covering loss or damage occurring while in transit from the Contractor&rsquo;s or Subcontractor&rsquo;s works or stores until arrival at the Site, to the Plant (including spare parts therefor) and to the Contractor&rsquo;s Equipment.</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; <u>Installation All Risks Insurance</u></p><p>Covering physical loss or damage to the Facilities at the Site, occurring prior to Completion of the Facilities, with an extended maintenance coverage for the Contractor&rsquo;s liability in respect of any loss or damage occurring during the Defect Liability Period while the Contractor is on the Site for the purpose of performing its obligations during the Defect Liability Period.</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; <u>Third Party Liability Insurance</u></p><p>Covering bodily injury or death suffered by third Parties including the Employer&rsquo;s personnel, and loss of or damage to property occurring in connection with the supply and installation of the Facilities.</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; <u>Automobile Liability Insurance</u></p><p>Covering use of all vehicles used by the Contractor or its Subcontractors, whether or not owned by them, in connection with the execution of the Contract.</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; <u>Workers&rsquo; Compensation</u></p><p>In accordance with the statutory requirements applicable in any country where the Contract or any part thereof is executed.</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; <u>Employer&rsquo;s Liability</u></p><p>In accordance with the statutory requirements applicable in any country where the Contract or any part thereof is executed.</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; <u>Other Insurances</u></p><p>Such other insurances as may be specifically agreed upon by the Parties hereto as listed in the Appendix to the Contract Agreement titled Insurance Requirements.</p><p>34.2&nbsp;&nbsp; The Employer shall be named as co-insured under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Third Party Liability, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances, and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1 except for the Cargo Insurance During Transport, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances.&nbsp; All insurer&rsquo;s rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.</p><p>34.3&nbsp;&nbsp; The Contractor shall, in accordance with the provisions of the Appendix to the Contract Agreement titled Insurance Requirements, deliver to the Employer certificates of insurance or copies of the insurance policies as evidence that the required policies are in full force and effect.&nbsp; The certificates shall provide that no less than twenty-one (21) days&rsquo; notice shall be given to the Employer by insurers prior to cancellation or material modification of a policy.</p><p>34.4&nbsp;&nbsp; The Contractor shall ensure that, where applicable, its Subcontractor(s) shall take out and maintain in effect adequate insurance policies for their personnel and vehicles and for work executed by them under the Contract, unless such Subcontractors are covered by the policies taken out by the Contractor.</p><p>34.5&nbsp;&nbsp; The Employer shall at its expense take out and maintain in effect during the performance of the Contract those insurances specified in the&nbsp; Appendix to the Contract Agreement titled Insurance Requirements, in the sums and with the deductibles and other conditions specified in the said Appendix.&nbsp; The Contractor and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all such policies.&nbsp; All insurers&rsquo; rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.&nbsp; The Employer shall deliver to the Contractor satisfactory evidence that the required insurances are in full force and effect.&nbsp; The policies shall provide that not less than twenty-one (21) days&rsquo; notice shall be given to the Contractor by all insurers prior to any cancellation or material modification of the policies.&nbsp; If so requested by the Contractor, the Employer shall provide copies of the policies taken out by the Employer under this GCC Sub-Clause 34.5.</p><p>34.6&nbsp;&nbsp; If the Contractor fails to take out and/or maintain in effect the insurances referred to in GCC Sub-Clause 34.1, the Employer may take out and maintain in effect any such insurances and may from time to time deduct from any amount due the Contractor under the Contract any premium that the Employer shall have paid to the insurer, or may otherwise recover such amount as a debt due from the Contractor.&nbsp; If the Employer fails to take out and/or maintain in effect the insurances referred to in GCC 34.5, the Contractor may take out and maintain in effect any such insurances and may from time to time deduct from any amount due the Employer under the Contract any premium that the Contractor shall have paid to the insurer, or may otherwise recover such amount as a debt due from the Employer.&nbsp; If the Contractor fails to or is unable to take out and maintain in effect any such insurances, the Contractor shall nevertheless have no liability or responsibility towards the Employer, and the Contractor shall have full recourse against the Employer for any and all liabilities of the Employer herein.</p><p>34.7&nbsp;&nbsp; Unless otherwise provided in the Contract, the Contractor shall prepare and conduct all and any claims made under the policies effected by it pursuant to this GCC Clause 34, and all monies payable by any insurers shall be paid to the Contractor.&nbsp; The Employer shall give to the Contractor all such reasonable assistance as may be required by the Contractor.&nbsp; With respect to insurance claims in which the Employer&rsquo;s interest is involved, the Contractor shall not give any release or make any compromise with the insurer without the prior written consent of the Employer.&nbsp; With respect to insurance claims in which the Contractor&rsquo;s interest is involved, the Employer shall not give any release or make any compromise with the insurer without the prior written consent of the Contractor.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>35.&nbsp; Unforeseen Conditions</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>35.1&nbsp;&nbsp; If, during the execution of the Contract, the Contractor shall encounter on the Site any physical conditions other than climatic conditions, or artificial obstructions that could not have been reasonably foreseen prior to the date of the Contract Agreement by an experienced contractor on the basis of reasonable examination of the data relating to the Facilities including any data as to boring tests, provided by the Employer, and on the basis of information that it could have obtained from a visual inspection of the Site if access thereto was available, or other data readily available to it relating to the Facilities, and if the Contractor determines that it will in consequence of such conditions or obstructions incur additional cost and expense or require additional time to perform its obligations under the Contract that would not have been required if such physical conditions or artificial obstructions had not been encountered, the Contractor shall promptly, and before performing additional work or using additional Plant or Contractor&rsquo;s Equipment, notify the Project Manager in writing of</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the physical conditions or artificial obstructions on the Site that could not have been reasonably foreseen;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the additional work and/or Plant and/or Contractor&rsquo;s Equipment required, including the steps which the Contractor will or proposes to take to overcome such conditions or obstructions;</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; the extent of the anticipated delay; and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; the additional cost and expense that the Contractor is likely to incur.</p><p>On receiving any notice from the Contractor under this GCC Sub-Clause 35.1, the Project Manager shall promptly consult with the Employer and Contractor and decide upon the actions to be taken to overcome the physical conditions or artificial obstructions encountered.&nbsp; Following such consultations, the Project Manager shall instruct the Contractor, with a copy to the Employer, of the actions to be taken.</p><p>35.2&nbsp;&nbsp; Any reasonable additional cost and expense incurred by the Contractor in following the instructions from the Project Manager to overcome such physical conditions or artificial obstructions referred to in GCC Sub-Clause 35.1 shall be paid by the Employer to the Contractor as an addition to the Contract Price.</p><p>If the Contractor is delayed or impeded in the performance of the Contract because of any such physical conditions or artificial obstructions referred to in GCC Sub-Clause 35.1, the Time for Completion shall be extended in accordance with GCC Clause 40.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>36.&nbsp; Change in Laws and Regulations</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>36.1&nbsp;&nbsp; If, after the date twenty-eight (28) days prior to the date of Bid submission, in the country where the Site is located, any law, regulation, ordinance, order or by-law having the force of law is enacted, promulgated, abrogated or changed which shall be deemed to include any change in interpretation or application by the competent authorities, that subsequently affects the costs and expenses of the Contractor and/or the Time for Completion, the Contract Price shall be correspondingly increased or decreased, and/or the Time for Completion shall be reasonably adjusted to the extent that the Contractor has thereby been affected in the performance of any of its obligations under the Contract.&nbsp; Notwithstanding the foregoing, such additional or reduced costs shall not be separately paid or credited if the same has already been accounted for in the price adjustment provisions where applicable, in accordance with the PCC pursuant to GCC Sub-Clause 11.2.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>37.&nbsp; Force Majeure</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>37.1&nbsp;&nbsp; &ldquo;Force Majeure&rdquo; shall mean any event beyond the reasonable control of the Employer or of the Contractor, as the case may be, and which is unavoidable notwithstanding the reasonable care of the Party affected, and shall include, without limitation, the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; war, hostilities or warlike operations whether a state of war be declared or not, invasion, act of foreign enemy and civil war</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; rebellion, revolution, insurrection, mutiny, usurpation of civil or military government, conspiracy, riot, civil commotion and terrorist acts</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; confiscation, nationalization, mobilization, commandeering or requisition by or under the order of any government or de jure or de facto authority or ruler or any other act or failure to act of any local state or national government authority</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; strike, sabotage, lockout, embargo, import restriction, port congestion, lack of usual means of public transportation and communication, industrial dispute, shipwreck, shortage or restriction of power supply, epidemics, quarantine and plague</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; earthquake, landslide, volcanic activity, fire, flood or inundation, tidal wave, typhoon or cyclone, hurricane, storm, lightning, or other inclement weather condition, nuclear and pressure waves or other natural or physical disaster</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; shortage of labor, materials or utilities where caused by circumstances that are themselves Force Majeure.</p><p>37.2&nbsp;&nbsp; If either Party is prevented, hindered or delayed from or in performing any of its obligations under the Contract by an event of Force Majeure, then it shall notify the other in writing of the occurrence of such event and the circumstances thereof within fourteen (14) days after the occurrence of such event.</p><p>37.3&nbsp;&nbsp; The Party who has given such notice shall be excused from the performance or punctual performance of its obligations under the Contract for so long as the relevant event of Force Majeure continues and to the extent that such Party&rsquo;s performance is prevented, hindered or delayed.&nbsp; The Time for Completion shall be extended in accordance with GCC Clause 40.</p><p>37.4&nbsp;&nbsp; The Party or Parties affected by the event of Force Majeure shall use reasonable efforts to mitigate the effect thereof upon its or their performance of the Contract and to fulfill its or their obligations under the Contract, but without prejudice to either Party&rsquo;s right to terminate the Contract under GCC Sub-Clauses 37.6 and 38.5.</p><p>37.5</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No delay or nonperformance by either Party hereto caused by the occurrence of any event of Force Majeure shall</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; constitute a default or breach of the Contract, or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; give rise to any claim for damages or additional cost or expense occasioned thereby, subject to GCC Sub-Clauses 32.2, 38.3 and 38.4</p><p>if and to the extent that such delay or nonperformance is caused by the occurrence of an event of Force Majeure.</p><p>37.6&nbsp;&nbsp; If the performance of the Contract is substantially prevented, hindered or delayed for a single period of more than sixty (60) days or an aggregate period of more than one hundred and twenty (120) days on account of one or more events of Force Majeure during the currency of the Contract, the Parties will attempt to develop a mutually satisfactory solution, failing which either Party may terminate the Contract by giving a notice to the other, but without prejudice to either Party&rsquo;s right to terminate the Contract under GCC Sub-Clause 38.5.</p><p>37.7&nbsp;&nbsp; In the event of termination pursuant to GCC Sub-Clause 37.6, the rights and obligations of the Employer and the Contractor shall be as specified in GCC Sub-Clauses 42.1.2 and 42.1.3.</p><p>37.8&nbsp;&nbsp; Notwithstanding GCC Sub-Clause 37.5, Force Majeure shall not apply to any obligation of the Employer to make payments to the Contractor herein.</p></td></tr><tr><td style=\"height:84px; vertical-align:top; width:144px\"><p><strong>38.&nbsp; War Risks</strong></p></td><td style=\"height:84px; vertical-align:top; width:466px\"><p>38.1&nbsp;&nbsp; &ldquo;War Risks&rdquo; shall mean any event specified in paragraphs (a) and (b) of GCC Sub-Clause 37.1 and any explosion or impact of any mine, bomb, shell, grenade or other projectile, missile, munitions or explosive of war, occurring or existing in or near the country (or countries) where the Site is located.</p><p>38.2&nbsp;&nbsp; Notwithstanding anything contained in the Contract, the Contractor shall have no liability whatsoever for or with respect to</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; destruction of or damage to Facilities, Plant, or any part thereof;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; destruction of or damage to property of the Employer or any third Party; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; injury or loss of life</p><p>if such destruction, damage, injury or loss of life is caused by any War Risks, and the Employer shall indemnify and hold the Contractor harmless from and against any and all claims, liabilities, actions, lawsuits, damages, costs, charges or expenses arising in consequence of or in connection with the same.</p><p>38.3&nbsp;&nbsp; If the Facilities or any Plant or Contractor&rsquo;s Equipment or any other property of the Contractor used or intended to be used for the purposes of the Facilities shall sustain destruction or damage by reason of any War Risks, the Employer shall pay the Contractor for</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any part of the Facilities or the Plant so destroyed or damaged to the extent not already paid for by the Employer</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; and so far as may be required by the Employer, and as may be necessary for completion of the Facilities</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; replacing or making good any Contractor&rsquo;s Equipment or other property of the Contractor so destroyed or damaged</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; replacing or making good any such destruction or damage to the Facilities or the Plant or any part thereof .</p><p>If the Employer does not require the Contractor to replace or make good any such destruction or damage to the Facilities, the Employer shall either request a change in accordance with GCC Clause 39, excluding the performance of that part of the Facilities thereby destroyed or damaged or, where the loss, destruction or damage affects a substantial part of the Facilities, shall terminate the Contract, pursuant to GCC Sub-Clause 42.1.</p><p>If the Employer requires the Contractor to replace or make good on any such destruction or damage to the Facilities, the Time for Completion shall be extended in accordance with GCC 40.</p><p>38.4&nbsp;&nbsp; Notwithstanding anything contained in the Contract, the Employer shall pay the Contractor for any increased costs or incidentals to the execution of the Contract that are in any way attributable to, consequent on, resulting from, or in any way connected with any War Risks, provided that the Contractor shall as soon as practicable notify the Employer in writing of any such increased cost.</p><p>38.5&nbsp;&nbsp; If during the performance of the Contract any War Risks shall occur that financially or otherwise materially affect the execution of the Contract by the Contractor, the Contractor shall use its reasonable efforts to execute the Contract with due and proper consideration given to the safety of its and its Subcontractors&rsquo; personnel engaged in the work on the Facilities, provided, however, that if the execution of the work on the Facilities becomes impossible or is substantially prevented for a single period of more than sixty (60) days or an aggregate period of more than one hundred and twenty (120) days on account of any War Risks, the Parties will attempt to develop a mutually satisfactory solution, failing which either Party may terminate the Contract by giving a notice to the other.</p><p>38.6&nbsp;&nbsp; In the event of termination pursuant to GCC Sub-Clauses 38.3 or 38.5, the rights and obligations of the Employer and the Contractor shall be specified in GCC Sub-Clauses 42.1.2 and 42.1.3.</p></td></tr></tbody></table><ol><li><strong>Change in Contract Elements</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>39.&nbsp; Change in the Facilities</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>39.1&nbsp;&nbsp; <u>Introducing a Change</u></p><p>39.1.1 Subject to GCC Sub-Clauses 39.2.5 and 39.2.7, the Employer shall have the right to propose, and subsequently require, that the Project Manager order the Contractor from time to time during the performance of the Contract to make any change, modification, addition or deletion to, in or from the Facilities hereinafter called &ldquo;Change&rdquo;, provided that such Change falls within the general scope of the Facilities and does not constitute unrelated work and that it is technically practicable, taking into account both the state of advancement of the Facilities and the technical compatibility of the Change envisaged with the nature of the Facilities as specified in the Contract.</p><p>39.1.2 Value Engineering: The Contractor may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;</p><ol><li>the proposed change(s), and a description of the difference to the existing contract requirements;</li><li>a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Employer may incur in implementing the value engineering proposal; and</li><li>a description of any effect(s) of the change on performance/functionality.</li></ol><p>The Employer may accept the value engineering proposal if the proposal demonstrates benefits that:</p><ol><li>accelerates the delivery period; or</li><li>reduces the Contract Price or the life cycle costs to the Employer; or</li><li>improves the quality, efficiency, safety or sustainability of the Facilities; or</li><li>yields any other benefits to the Employer,</li></ol><p>without compromising the necessary functions of the Facilities.</p><p>If the value engineering proposal is approved by the Employer and results in:</p><ol><li>a reduction of the Contract Price; the amount to be paid to the Contractor shall be the percentage specified in the PCC of the reduction in the Contract Price; or</li><li>an increase in the Contract Price; but results in a reduction in life cycle costs due to any benefit described in (a) to (d) above, the amount to be paid to the Contractor shall be the full increase in the Contract Price.</li></ol><p>39.1.3 Notwithstanding GCC Sub-Clauses 39.1.1 and 39.1.2, no change made necessary because of any default of the Contractor in the performance of its obligations under the Contract shall be deemed to be a Change, and such change shall not result in any adjustment of the Contract Price or the Time for Completion.</p><p>39.1.4 The procedure on how to proceed with and execute Changes is specified in GCC Sub-Clauses 39.2 and 39.3, and further details and forms are provided in the Employer&rsquo;s Requirements (Forms and Procedures).</p><p>39.2&nbsp;&nbsp; <u>Changes Originating from Employer</u></p><p>39.2.1 If the Employer proposes a Change pursuant to GCC Sub-Clause 39.1.1, it shall send to the Contractor a &ldquo;Request for Change Proposal,&rdquo; requiring the Contractor to prepare and furnish to the Project Manager as soon as reasonably practicable a &ldquo;Change Proposal,&rdquo; which shall include the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; brief description of the Change</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on the Time for Completion</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; estimated cost of the Change</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on Functional Guarantees (if any)</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on the Facilities</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; effect on any other provisions of the Contract: and</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;any additional documents as <strong>specified in the PCC</strong>.</p><p>39.2.2 Prior to preparing and submitting the &ldquo;Change Proposal,&rdquo; the Contractor shall submit to the Project Manager an &ldquo;Estimate for Change Proposal,&rdquo; which shall be an estimate of the cost of preparing and submitting the Change Proposal.</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Upon receipt of the Contractor&rsquo;s Estimate for Change Proposal, the Employer shall do one of the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; accept the Contractor&rsquo;s estimate with instructions to the Contractor to proceed with the preparation of the Change Proposal</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; advise the Contractor of any part of its Estimate for Change Proposal that is unacceptable and request the Contractor to review its estimate</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; advise the Contractor that the Employer does not intend to proceed with the Change.</p><p>39.2.3 Upon receipt of the Employer&rsquo;s instruction to proceed under GCC Sub-Clause 39.2.2 (a), the Contractor shall, with proper expedition, proceed with the preparation of the Change Proposal, in accordance with GCC Sub-Clause 39.2.1.</p><p>39.2.4 The pricing of any Change shall, as far as practicable, be calculated in accordance with the rates and prices included in the Contract.&nbsp; If such rates and prices are inequitable, the Parties thereto shall agree on specific rates for the valuation of the Change.</p><p>39.2.5 If before or during the preparation of the Change Proposal it becomes apparent that the aggregate effect of compliance therewith and with all other Change Orders that have already become binding upon the Contractor under this GCC Clause 39 would be to increase or decrease the Contract Price as originally set forth in Article 2 (Contract Price) of the Contract Agreement by more than fifteen percent (15%), the Contractor may give a written notice of objection thereto prior to furnishing the Change Proposal as aforesaid.&nbsp; If the Employer accepts the Contractor&rsquo;s objection, the Employer shall withdraw the proposed Change and shall notify the Contractor in writing thereof.</p><p>The Contractor&rsquo;s failure to so object shall neither affect its right to object to any subsequent requested Changes or Change Orders herein, nor affect its right to take into account, when making such subsequent objection, the percentage increase or decrease in the Contract Price that any Change not objected to by the Contractor represents.</p><p>39.2.6 Upon receipt of the Change Proposal, the Employer and the Contractor shall mutually agree upon all matters therein contained.&nbsp; Within fourteen (14) days after such agreement, the Employer shall, if it intends to proceed with the Change, issue the Contractor with a Change Order.</p><p>If the Employer is unable to reach a decision within fourteen (14) days, it shall notify the Contractor with details of when the Contractor can expect a decision.</p><p>If the Employer decides not to proceed with the Change for whatever reason, it shall, within the said period of fourteen (14) days, notify the Contractor accordingly.&nbsp; Under such circumstances, the Contractor shall be entitled to reimbursement of all costs reasonably incurred by it in the preparation of the Change Proposal, provided that these do not exceed the amount given by the Contractor in its Estimate for Change Proposal submitted in accordance with GCC Sub-Clause 39.2.2.</p><p>39.2.7 If the Employer and the Contractor cannot reach agreement on the price for the Change, an equitable adjustment to the Time for Completion, or any other matters identified in the Change Proposal, the Employer may nevertheless instruct the Contractor to proceed with the Change by issue of a &ldquo;Pending Agreement Change Order.&rdquo;</p><p>Upon receipt of a Pending Agreement Change Order, the Contractor shall immediately proceed with effecting the Changes covered by such Order.&nbsp; The Parties shall thereafter attempt to reach agreement on the outstanding issues under the Change Proposal.</p><p>If the Parties cannot reach agreement within sixty (60) days from the date of issue of the Pending Agreement Change Order, then the matter may be referred to the Dispute Board in accordance with the provisions of GCC Sub-Clause 46.1.</p><p>39.3&nbsp;&nbsp; <u>Changes Originating from Contractor</u></p><p>39.3.1 If the Contractor proposes a Change pursuant to GCC Sub-Clause 39.1.2, the Contractor shall submit to the Project Manager a written &ldquo;Application for Change Proposal,&rdquo; giving reasons for the proposed Change and including the information specified in GCC Sub-Clause 39.1.2.</p><p>Upon receipt of the Application for Change Proposal, the Parties shall follow the procedures outlined in GCC Sub-Clauses 39.2.6 and 39.2.7.&nbsp; However, the Contractor shall not be entitled to recover the costs of preparing the Application for Change Proposal.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>40.&nbsp; Extension of Time for Completion</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>40.1&nbsp;&nbsp; The Time(s) for Completion specified in the PCC pursuant to GCC Sub-Clause 8.2 shall be extended if the Contractor is delayed or impeded in the performance of any of its obligations under the Contract by reason of any of the following:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; any Change in the Facilities as provided in GCC Clause 39</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; any occurrence of Force Majeure as provided in GCC Clause 37, unforeseen conditions as provided in GCC Clause 35, or other occurrence of any of the matters specified or referred to in paragraphs (a), (b) and (c) of GCC Sub-Clause 32.2</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any suspension order given by the Employer under GCC Clause 41 hereof or reduction in the rate of progress pursuant to GCC Sub-Clause 41.2 or</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any changes in laws and regulations as provided in GCC Clause 36 or</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; any default or breach of the Contract by the Employer, Appendix to the Contract Agreement titled ,or any activity, act or omission of the Employer, or the Project Manager, or any other contractors employed by the Employer, or</p><ol><li>any delay on the part of a Subcontractor, provided such delay is due to a cause for which the Contractor himself would have been entitled to an extension of time under this sub-clause, or</li><li>delays attributable to the Employer or caused by customs, or</li><li>any other matter specifically mentioned in the Contract</li></ol><p>by such period as shall be fair and reasonable in all the circumstances and as shall fairly reflect the delay or impediment sustained by the Contractor.</p><p>40.2&nbsp;&nbsp; Except where otherwise specifically provided in the Contract, the Contractor shall submit to the Project Manager a notice of a claim for an extension of the Time for Completion, together with particulars of the event or circumstance justifying such extension as soon as reasonably practicable after the commencement of such event or circumstance.&nbsp; As soon as reasonably practicable after receipt of such notice and supporting particulars of the claim, the Employer and the Contractor shall agree upon the period of such extension.&nbsp; In the event that the Contractor does not accept the Employer&rsquo;s estimate of a fair and reasonable time extension, the Contractor shall be entitled to refer the matter to a Dispute Board, pursuant to GCC Sub-Clause 46.1.</p><p>40.3 The Contractor shall at all times use its reasonable efforts to minimize any delay in the performance of its obligations under the Contract.</p><p>40.4&nbsp; In all cases where the Contractor has given a notice of a claim for an extension of time under GCC 40.2, the Contractor shall consult with the Project Manager in order to determine the steps (if any) which can be taken to overcome or minimize the actual or anticipated delay. The Contractor shall there after comply with all reasonable instructions which the Project Manager shall give in order to minimize such delay. If compliance with such instructions shall cause the Contractor to incur extra costs and the Contractor is entitled to an extension of time under GCC 40.1, the amount of such extra costs shall be added to the Contract Price.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>41.&nbsp; Suspension</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>41.1&nbsp;&nbsp; The Employer may request the Project Manager, by notice to the Contractor, to order the Contractor to suspend performance of any or all of its obligations under the Contract.&nbsp; Such notice shall specify the obligation of which performance is to be suspended, the effective date of the suspension and the reasons therefor.&nbsp; The Contractor shall thereupon suspend performance of such obligation, except those obligations necessary for the care or preservation of the Facilities, until ordered in writing to resume such performance by the Project Manager.</p><p>If, by virtue of a suspension order given by the Project Manager, other than by reason of the Contractor&rsquo;s default or breach of the Contract, the Contractor&rsquo;s performance of any of its obligations is suspended for an aggregate period of more than ninety (90) days, then at any time thereafter and provided that at that time such performance is still suspended, the Contractor may give a notice to the Project Manager requiring that the Employer shall, within twenty-eight (28) days of receipt of the notice, order the resumption of such performance or request and subsequently order a change in accordance with GCC Clause 39, excluding the performance of the suspended obligations from the Contract.</p><p>If the Employer fails to do so within such period, the Contractor may, by a further notice to the Project Manager, elect to treat the suspension, where it affects a part only of the Facilities, as a deletion of such part in accordance with GCC Clause 39 or, where it affects the whole of the Facilities, as termination of the Contract under GCC Sub-Clause 42.1.</p><p>41.2&nbsp;&nbsp; If</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Employer has failed to pay the Contractor any sum due under the Contract within the specified period, has failed to approve any invoice or supporting documents without just cause pursuant to the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, or commits a substantial breach of the Contract, the Contractor may give a notice to the Employer that requires payment of such sum, with interest thereon as stipulated in GCC Sub-Clause 12.3, requires approval of such invoice or supporting documents, or specifies the breach and requires the Employer to remedy the same, as the case may be.&nbsp; If the Employer fails to pay such sum together with such interest, fails to approve such invoice or supporting documents or give its reasons for withholding such approval, or fails to remedy the breach or take steps to remedy the breach within fourteen (14) days after receipt of the Contractor&rsquo;s notice or</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the Contractor is unable to carry out any of its obligations under the Contract for any reason attributable to the Employer, including but not limited to the Employer&rsquo;s failure to provide possession of or access to the Site or other areas in accordance with GCC Sub-Clause 10.2, or failure to obtain any governmental permit necessary for the execution and/or completion of the Facilities,</p><p>then the Contractor may by fourteen (14) days&rsquo; notice to the Employer suspend performance of all or any of its obligations under the Contract, or reduce the rate of progress.</p><p>41.3&nbsp;&nbsp; If the Contractor&rsquo;s performance of its obligations is suspended or the rate of progress is reduced pursuant to this GCC Clause 41, then the Time for Completion shall be extended in accordance with GCC Sub-Clause 40.1, and any and all additional costs or expenses incurred by the Contractor as a result of such suspension or reduction shall be paid by the Employer to the Contractor in addition to the Contract Price, except in the case of suspension order or reduction in the rate of progress by reason of the Contractor&rsquo;s default or breach of the Contract.</p><p>41.4&nbsp;&nbsp; During the period of suspension, the Contractor shall not remove from the Site any Plant, any part of the Facilities or any Contractor&rsquo;s Equipment, without the prior written consent of the Employer.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>42.&nbsp; Termination</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>42.1&nbsp;&nbsp; <u>Termination for Employer&rsquo;s Convenience</u></p><p>42.1.1 The Employer may at any time terminate the Contract for any reason by giving the Contractor a notice of termination that refers to this GCC Sub-Clause 42.1.</p><p>42.1.2 Upon receipt of the notice of termination under GCC Sub-Clause 42.1.1, the Contractor shall either immediately or upon the date specified in the notice of termination</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as the Employer may specify in the notice of termination for the sole purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) (ii) below</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; remove all Contractor&rsquo;s Equipment from the Site, repatriate the Contractor&rsquo;s Personnel from the Site, remove from the Site any wreckage, rubbish and debris of any kind, and leave the whole of the Site in a clean and safe condition, and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; subject to the payment specified in GCC Sub-Clause 42.1.3,</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(ii)&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors; and</p><p>(iii)&nbsp;&nbsp; deliver to the Employer all non-proprietary drawings, specifications and other documents prepared by the Contractor or its Subcontractors as at the date of termination in connection with the Facilities.</p><p>42.1.3 In the event of termination of the Contract under GCC Sub-Clause 42.1.1, the Employer shall pay to the Contractor the following amounts:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Contract Price, properly attributable to the parts of the Facilities executed by the Contractor as of the date of termination</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; the costs reasonably incurred by the Contractor in the removal of the Contractor&rsquo;s Equipment from the Site and in the repatriation of the Contractor&rsquo;s Personnel</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; any amounts to be paid by the Contractor to its Subcontractors in connection with the termination of any subcontracts, including any cancellation charges</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; costs incurred by the Contractor in protecting the Facilities and leaving the Site in a clean and safe condition pursuant to paragraph (a) of GCC Sub-Clause 42.1.2</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; the cost of satisfying all other obligations, commitments and claims that the Contractor may in good faith have undertaken with third Parties in connection with the Contract and that are not covered by paragraphs (a) through (d) above.</p><p>42.2&nbsp;&nbsp; <u>Termination for Contractor&rsquo;s Default</u></p><p>42.2.1 The Employer, without prejudice to any other rights or remedies it may possess, may terminate the Contract forthwith in the following circumstances by giving a notice of termination and its reasons therefor to the Contractor, referring to this GCC Sub-Clause 42.2:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor becomes bankrupt or insolvent, has a receiving order issued against it, compounds with its creditors, or, if the Contractor is a corporation, a resolution is passed or order is made for its winding up, other than a voluntary liquidation for the purposes of amalgamation or reconstruction, a receiver is appointed over any part of its undertaking or assets, or if the Contractor takes or suffers any other analogous action in consequence of debt</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor assigns or transfers the Contract or any right or interest therein in violation of the provision of GCC Clause 43.</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; if the Contractor, in the judgment of the Employer has engaged in Fraud and Corruption, as defined in&nbsp;&nbsp; paragrpah 2.2 a. of Appendix B to the GCC, in competing for or in executing the Contract.</p><p>42.2.2 If the Contractor</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; has abandoned or repudiated the Contract</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; has without valid reason failed to commence work on the Facilities promptly or has suspended, other than pursuant to GCC Sub-Clause 41.2, the progress of Contract performance for more than twenty-eight (28) days after receiving a written instruction from the Employer to proceed</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; persistently fails to execute the Contract in accordance with the Contract or persistently neglects to carry out its obligations under the Contract without just cause</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; refuses or is unable to provide sufficient materials, services or labor to execute and complete the Facilities in the manner specified in the program furnished under GCC Sub-Clause 18.2&nbsp; at rates of progress that give reasonable assurance to the Employer that the Contractor can attain Completion of the Facilities by the Time for Completion as extended,</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; then the Employer may, without prejudice to any other rights it may possess under the Contract, give a notice to the Contractor stating the nature of the default and requiring the Contractor to remedy the same.&nbsp; If the Contractor fails to remedy or to take steps to remedy the same within fourteen (14) days of its receipt of such notice, then the Employer may terminate the Contract forthwith by giving a notice of termination to the Contractor that refers to this GCC Sub-Clause 42.2.</p><p>42.2.3 Upon receipt of the notice of termination under GCC Sub-Clauses 42.2.1 or 42.2.2, the Contractor shall, either immediately or upon such date as is specified in the notice of termination,</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as the Employer may specify in the notice of termination for the sole purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) below</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the&nbsp; Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer all drawings, specifications and other documents prepared by the Contractor or its Subcontractors as of the date of termination in connection with the Facilities.</p><p>42.2.4 The Employer may enter upon the Site, expel the Contractor, and complete the Facilities itself or by employing any third Party.&nbsp; The Employer may, to the exclusion of any right of the Contractor over the same, take over and use with the payment of a fair rental rate to the Contractor, with all the maintenance costs to the account of the Employer and with an indemnification by the Employer for all liability including damage or injury to persons arising out of the Employer&rsquo;s use of such equipment, any Contractor&rsquo;s Equipment owned by the Contractor and on the Site in connection with the Facilities for such reasonable period as the Employer considers expedient for the supply and installation of the Facilities.</p><p>Upon completion of the Facilities or at such earlier date as the Employer thinks appropriate, the Employer shall give notice to the Contractor that such Contractor&rsquo;s Equipment will be returned to the Contractor at or near the Site and shall return such Contractor&rsquo;s Equipment to the Contractor in accordance with such notice.&nbsp; The Contractor shall thereafter without delay and at its cost remove or arrange removal of the same from the Site.</p><p>42.2.5 Subject to GCC Sub-Clause 42.2.6, the Contractor shall be entitled to be paid the Contract Price attributable to the Facilities executed as of the date of termination, the value of any unused or partially used Plant on the Site, and the costs, if any, incurred in protecting the Facilities and in leaving the Site in a clean and safe condition pursuant to paragraph (a) of GCC Sub-Clause 42.2.3.&nbsp; Any sums due the Employer from the Contractor accruing prior to the date of termination shall be deducted from the amount to be paid to the Contractor under this Contract.</p><p>42.2.6 If the Employer completes the Facilities, the cost of completing the Facilities by the Employer shall be determined.</p><p>If the sum that the Contractor is entitled to be paid, pursuant to GCC Sub-Clause 42.2.5, plus the reasonable costs incurred by the Employer in completing the Facilities, exceeds the Contract Price, the Contractor shall be liable for such excess.</p><p>If such excess is greater than the sums due the Contractor under GCC Sub-Clause 42.2.5, the Contractor shall pay the balance to the Employer, and if such excess is less than the sums due the Contractor under GCC Sub-Clause 42.2.5, the Employer shall pay the balance to the Contractor.</p><p>The Employer and the Contractor shall agree, in writing, on the computation described above and the manner in which any sums shall be paid.</p><p>42.3&nbsp;&nbsp; <u>Termination by the Contractor</u></p><p>42.3.1 If</p><p>(a)&nbsp;&nbsp;&nbsp; the Employer has failed to pay the Contractor any sum due under the Contract within the specified period, has failed to approve any invoice or supporting documents without just cause pursuant to the&nbsp; Appendix to the Contract Agreement titled Terms and Procedures of Payment, or commits a substantial breach of the Contract, the Contractor may give a notice to the Employer that requires payment of such sum, with interest thereon as stipulated in GCC Sub-Clause 12.3, requires approval of such invoice or supporting documents, or specifies the breach and requires the Employer to remedy the same, as the case may be.&nbsp; If the Employer fails to pay such sum together with such interest, fails to approve such invoice or supporting documents or give its reasons for withholding such approval, fails to remedy the breach or take steps to remedy the breach within fourteen (14) days after receipt of the Contractor&rsquo;s notice, or</p><p>(b)&nbsp;&nbsp;&nbsp; the Contractor is unable to carry out any of its obligations under the Contract for any reason attributable to the Employer, including but not limited to the Employer&rsquo;s failure to provide possession of or access to the Site or other areas or failure to obtain any governmental permit necessary for the execution and/or completion of the Facilities,</p><p>then the Contractor may give a notice to the Employer thereof, and if the Employer has failed to pay the outstanding sum, to approve the invoice or supporting documents, to give its reasons for withholding such approval, or to remedy the breach within twenty-eight (28) days of such notice, or if the Contractor is still unable to carry out any of its obligations under the Contract for any reason attributable to the Employer within twenty-eight (28) days of the said notice, the Contractor may by a further notice to the Employer referring to this GCC Sub-Clause 42.3.1, forthwith terminate the Contract.</p><p>42.3.2 The Contractor may terminate the Contract forthwith by giving a notice to the Employer to that effect, referring to this GCC Sub-Clause 42.3.2, if the Employer becomes bankrupt or insolvent, has a receiving order issued against it, compounds with its creditors, or, being a corporation, if a resolution is passed or order is made for its winding up (other than a voluntary liquidation for the purposes of amalgamation or reconstruction), a receiver is appointed over any part of its undertaking or assets, or if the Employer takes or suffers any other analogous action in consequence of debt.</p><p>42.3.3 If the Contract is terminated under GCC Sub-Clauses 42.3.1 or 42.3.2, then the Contractor shall immediately</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; cease all further work, except for such work as may be necessary for the purpose of protecting that part of the Facilities already executed, or any work required to leave the Site in a clean and safe condition</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; terminate all subcontracts, except those to be assigned to the Employer pursuant to paragraph (d) (ii)</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; remove all Contractor&rsquo;s Equipment from the Site and repatriate the Contractor&rsquo;s Personnel from the Site, and</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; subject to the payment specified in GCC Sub-Clause 42.3.4,</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; deliver to the Employer the parts of the Facilities executed by the Contractor up to the date of termination</p><p>(ii)&nbsp;&nbsp;&nbsp; to the extent legally possible, assign to the Employer all right, title and benefit of the Contractor to the Facilities and to the Plant as of the date of termination, and, as may be required by the Employer, in any subcontracts concluded between the Contractor and its Subcontractors, and</p><p>(iii)&nbsp;&nbsp; deliver to the Employer all drawings, specifications and other documents prepared by the Contractor or its Subcontractors as of the date of termination in connection with the Facilities.</p><p>42.3.4 If the Contract is terminated under GCC Sub-Clauses 42.3.1 or 42.3.2, the Employer shall pay to the Contractor all payments specified in GCC Sub-Clause 42.1.3, and reasonable compensation for all loss, except for loss of profit, or damage sustained by the Contractor arising out of, in connection with or in consequence of such termination.</p><p>42.3.5 Termination by the Contractor pursuant to this GCC Sub-Clause 42.3 is without prejudice to any other rights or remedies of the Contractor that may be exercised in lieu of or in addition to rights conferred by GCC Sub-Clause 42.3.</p><p>42.4&nbsp;&nbsp; In this GCC Clause 42, the expression &ldquo;Facilities executed&rdquo; shall include all work executed, Installation Services provided, and all Plant acquired, or subject to a legally binding obligation to purchase, by the Contractor and used or intended to be used for the purpose of the Facilities, up to and including the date of termination.</p><p>42.5&nbsp;&nbsp; In this GCC Clause 42, in calculating any monies due from the Employer to the Contractor, account shall be taken of any sum previously paid by the Employer to the Contractor under the Contract, including any advance payment paid pursuant to the Appendix to the Contract Agreement titled Terms and Procedures of Payment.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>43.&nbsp; Assignment</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>43.1&nbsp;&nbsp; Neither the Employer nor the Contractor shall, without the express prior written consent of the other Party, which consent shall not be unreasonably withheld, assign to any third Party the Contract or any part thereof, or any right, benefit, obligation or interest therein or thereunder, except that the Contractor shall be entitled to assign either absolutely or by way of charge any monies due and payable to it or that may become due and payable to it under the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>44. Export Restrictions</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>44.1&nbsp;&nbsp; Notwithstanding any obligation under the Contract to complete all export formalities, any export restrictions attributable to the Employer, to the country of the Employer or to the use of the Plant and Installation Services to be supplied which arise from trade regulations from a country supplying those Plant and Installation Services, and which substantially impede the Contractor from meeting its obligations under the Contract, shall release the Contractor from the obligation to provide deliveries or services, always provided, however, that the Contractor can demonstrate to the satisfaction of the Employer and of the Bank that it has completed all formalities in a timely manner, including applying for permits, authorizations and licenses necessary for the export of the Plant and Installation Services under the terms of the Contract.&nbsp; Termination of the Contract on this basis shall be for the Employer&rsquo;s convenience pursuant to Sub-Clause 42.1.</p></td></tr></tbody></table><ol><li><strong>Claims, Disputes and Arbitration</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:617px\"><tbody><tr><td style=\"vertical-align:top; width:144px\"><p><strong>45.&nbsp; Contractor&rsquo;s Claims</strong></p></td><td style=\"vertical-align:top; width:473px\"><p>45.1&nbsp;&nbsp; If the Contractor considers himself to be entitled to any extension of the Time for Completion and/or any additional payment, under any Clause of these Conditions or otherwise in connection with the Contract, the Contractor shall submit a notice to the Project Manager, describing the event or circumstance giving rise to the claim. The notice shall be given as soon as practicable, and not later than 28 days after the Contractor became aware, or should have become aware, of the event or circumstance.</p><p>If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim. Otherwise, the following provisions of this Sub-Clause shall apply.</p><p>The Contractor shall also submit any other notices which are required by the Contract, and supporting particulars for the claim, all as relevant to such event or circumstance.</p><p>The Contractor shall keep such contemporary records as may be necessary to substantiate any claim, either on the Site or at another location acceptable to the Project Manager. Without admitting the Employer&rsquo;s liability, the Project Manager may, after receiving any notice under this Sub-Clause, monitor the record-keeping and/or instruct the Contractor to keep further contemporary records. The Contractor shall permit the Project Manager to inspect all these records, and shall (if instructed) submit copies to the Project Manager.</p><p>Within 42 days after the Contractor became aware (or should have become aware) of the event or circumstance giving rise to the claim, or within such other period as may be proposed by the Contractor and approved by the Project Manager, the Contractor shall send to the Project Manager a fully detailed claim which includes full supporting particulars of the basis of the claim and of the extension of time and/or additional payment claimed. If the event or circumstance giving rise to the claim has a continuing effect:</p><ol><li>this fully detailed claim shall be considered as interim;</li><li>the Contractor shall send further interim claims at monthly intervals, giving the accumulated delay and/or amount claimed, and such further particulars as the Project Manager may reasonably require; and</li><li>the Contractor shall send a final claim within 28 days after the end of the effects resulting from the event or circumstance, or within such other period as may be proposed by the Contractor and approved by the Project Manager.</li></ol><p>Within 42 days after receiving a claim or any further particulars supporting a previous claim, or within such other period as may be proposed by the Project Manager and approved by the Contractor, the Project Manager shall respond with approval, or with disapproval and detailed comments. He may also request any necessary further particulars, but shall nevertheless give his response on the principles of the claim within such time.</p><p>Each Payment Certificate shall include such amounts for any claim as have been reasonably substantiated as due under the relevant provision of the Contract. Unless and until the particulars supplied are sufficient to substantiate the whole of the claim, the Contractor shall only be entitled to payment for such part of the claim as he has been able to substantiate.</p><p>The Project Manager shall agree with the Contractor or estimate: (i) the extension (if any) of the Time for Completion (before or after its expiry) in accordance with GCC Clause 40, and/or (ii) the additional payment (if any) to which the Contractor is entitled under the Contract.</p><p>The requirements of this Sub-Clause are in addition to those of any other Sub-Clause which may apply to a claim. If the Contractor fails to comply with this or another Sub-Clause in relation to any claim, any extension of time and/or additional payment shall take account of the extent (if any) to which the failure has prevented or prejudiced proper investigation of the claim, unless the claim is excluded under the second paragraph of this Sub-Clause.</p><p>In the event that the Contractor and the Employer cannot agree on any matter relating to a claim, either Party may refer the matter to the Dispute Board pursuant to GCC 46 hereof.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>46. Disputes and Arbitration</strong></p></td><td style=\"vertical-align:top; width:473px\"><p>46.1 &nbsp; Appointment of the Dispute Board</p><p>Disputes shall be referred to a DB for decision in accordance with GCC Sub-Clause 46.3. The Parties shall appoint a DB by the date stated in the PCC.</p><p>The DB shall comprise, as stated in the PCC, either one or three suitably qualified persons (&ldquo;the members&rdquo;), each of whom shall meet the criteria set forth in Sub-Clause 3 of Appendix A- General Conditions of Dispute Board Agreement. If the number is not so stated and the Parties do not agree otherwise, the DB shall comprise three persons, one of whom shall serve as chairman.</p><p>If the Contract is with a foreign Contractor, the DB members shall not have the same nationality as the Employer or the Contractor.</p><p>If the Parties have not jointly appointed the DB 21 days before the date stated in the PCC and the DB is to comprise three persons, each Party shall nominate one member for the approval of the other Party. The first two members shall recommend and the Parties shall agree upon the third member, who shall act as chairman.</p><p>However, if a list of potential members is included in the PCC, the members shall be selected from those on the list, other than anyone who is unable or unwilling to accept appointment to the DB.</p><p>The agreement between the Parties and either the sole member or each of the three members shall incorporate by reference the General Conditions of Dispute Board Agreement contained in the Appendix to these General Conditions, with such amendments as are agreed between them.</p><p>The DB shall be deemed to be constituted on the date the Parties and the sole member or the three members (as the case may be) of the DB have all signed a DB agreement.</p><p>The terms of the remuneration of either the sole member or each of the three members, including the remuneration of any expert whom the DB consults, shall be mutually agreed upon by the Parties when agreeing the terms of appointment of the member or such expert (as the case may be). Each Party shall be responsible for paying one-half of this remuneration.</p><p>If a member declines to act or is unable to act as a result of death, disability, resignation or termination of appointment, a replacement shall be appointed in the same manner as the replaced person was required to have been nominated or agreed upon, as described in this Sub-Clause.</p><p>The appointment of any member may be terminated by mutual agreement of both Parties, but not by the Employer or the Contractor acting alone. Unless otherwise agreed by both Parties, the appointment of the DB (including each member) shall expire when the Operational Acceptance Certificate has been issued in accordance with GCC Sub-Clause 25.3.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.2&nbsp;&nbsp; Failure to Agree on the Composition of the Dispute Board</p><p>If any of the following conditions apply, namely:</p><ol><li>the Parties fail to agree upon the appointment of the sole member of the DB by the date stated in the first paragraph of GCC Sub-Clause 46.1,</li><li>either Party fails to nominate a member (for approval by the other Party) of a DB of three persons by such date,</li><li>the Parties fail to agree upon the appointment of the third member (to act as chairman) of the DB by such date, or</li><li>the Parties fail to agree upon the appointment of a replacement person within 42 days after the date on which the sole member or one of the three members declines to act or is unable to act as a result of death, disability, resignation or termination of appointment,</li></ol><p>then the appointing entity or official <strong>named in the PCC</strong> shall, upon the request of either or both of the Parties and after due consultation with both Parties, appoint this member of the DB. This appointment shall be final and conclusive. Each Party shall be responsible for paying one-half of the remuneration of the appointing entity or official.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.3&nbsp;&nbsp; Obtaining Dispute Board&rsquo;s Decision</p><p>If a dispute (of any kind whatsoever) arises between the Parties in connection with the performance of the Contract, including any dispute as to any certificate, determination, instruction, opinion or valuation of the Project Manager, either Party may refer the dispute in writing to the DB for its decision, with copies to the other Party and the Project Manager. Such reference shall state that it is given under this Sub-Clause.</p><p>For a DB of three persons, the DB shall be deemed to have received such reference on the date when it is received by the chairman of the DB.</p><p>Both Parties shall promptly make available to the DB all such additional information, further access to the Site, and appropriate facilities, as the DB may require for the purposes of making a decision on such dispute. The DB shall be deemed to be not acting as arbitrator(s).</p><p>Within 84 days after receiving such reference, or within such other period as may be proposed by the DB and approved by both Parties, the DB shall give its decision, which shall be reasoned and shall state that it is given under this Sub-Clause. The decision shall be binding on both Parties, who shall promptly give effect to it unless and until it shall be revised in an amicable settlement or an arbitral award as described below. Unless the Contract has already been abandoned, repudiated or terminated, the Contractor shall continue with the performance of the Facilities in accordance with the Contract.</p><p>If either Party is dissatisfied with the DB&rsquo;s decision, then either Party may, within 28 days after receiving the decision, give notice to the other Party of its dissatisfaction and intention to commence arbitration. If the DB fails to give its decision within the period of 84 days (or as otherwise approved) after receiving such reference, then either Party may, within 28 days after this period has expired, give notice to the other Party of its dissatisfaction and intention to commence arbitration.</p><p>In either event, this notice of dissatisfaction shall state that it is given under this Sub-Clause, and shall set out the matter in dispute and the reason(s) for dissatisfaction. Except as stated in GCC Sub-Clauses 46.6 and 46.7, neither Party shall be entitled to commence arbitration of a dispute unless a notice of dissatisfaction has been given in accordance with this Sub-Clause.</p><p>If the DB has given its decision as to a matter in dispute to both Parties, and no notice of dissatisfaction has been given by either Party within 28 days after it received the DB&rsquo;s decision, then the decision shall become final and binding upon both Parties.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.4&nbsp;&nbsp; Amicable Settlement</p><p>Where notice of dissatisfaction has been given under GCC Sub-Clause 46.3 above, both Parties shall attempt to settle the dispute amicably before the commencement of arbitration. However, unless both Parties agree otherwise, arbitration may be commenced on or after the fifty-sixth day after the day on which notice of dissatisfaction and intention to commence arbitration was given, even if no attempt at amicable settlement has been made.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.5&nbsp;&nbsp; Arbitration</p><p>Unless <strong>indicated otherwise in the PCC,</strong> any dispute not settled amicably and in respect of which the DB&rsquo;s decision (if any) has not become final and binding shall be finally settled by arbitration. Unless otherwise agreed by both Parties, arbitration shall be conducted as follows:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; For contracts with foreign contractors:</p><p><strong>unless otherwise specified in the PCC</strong>; the dispute shall be finally settled under the Rules of Arbitration of the International Chamber of Commerce; by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be the neutral location <strong>stated in the PCC</strong>; and the arbitration shall be conducted in the ruling language <strong>stated in the PCC</strong>;</p><p>and</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; For contracts with domestic contractors, arbitration with proceedings conducted in accordance with the laws of the Employer&rsquo;s Country.</p><p>The arbitrator(s) shall have full power to open up, review and revise any certificate, determination, instruction, opinion or valuation of the Project Manager, and any decision of the DB, relevant to the dispute. Nothing shall disqualify the Project Manager from being called as a witness and giving evidence before the arbitrator(s) on any matter whatsoever relevant to the dispute.</p><p>Neither Party shall be limited in the proceedings before the arbitrator(s) to the evidence or arguments previously put before the DB to obtain its decision, or to the reasons for dissatisfaction given in its notice of dissatisfaction. Any decision of the DB shall be admissible in evidence in the arbitration.</p><p>Arbitration may be commenced prior to or after completion of the Facilities. The obligations of the Parties, the Project Manager and the DB shall not be altered by reason of any arbitration being conducted during the progress of the execution of the Facilities.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.6&nbsp;&nbsp; Failure to Comply with Dispute Board&rsquo;s Decision</p><p>In the event that a Party fails to comply with a DB decision which has become final and binding, then the other Party may, without prejudice to any other rights it may have, refer the failure itself to arbitration under GCC Sub-Clause 46.5. GCC Sub-Clauses 46.3 and 46.4 shall not apply to this reference.</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>46.7&nbsp;&nbsp; Expiry of Dispute Board&rsquo;s Appointment</p><p>If a dispute arises between the Parties in connection with the performance of the Contract, and there is no DB in place, whether by reason of the expiry of the DB&rsquo;s appointment or otherwise:</p><p>(a) &nbsp;&nbsp;&nbsp; GCC Sub-Clauses 46.3 and 46.4 shall not apply, and</p><p>(b) &nbsp;&nbsp;&nbsp; the dispute may be referred directly to arbitration under GCC Sub-Clause 46.5</p></td></tr><tr><td style=\"vertical-align:top; width:144px\"><p><strong>47. Cyber Security </strong></p><p>&nbsp;</p></td><td style=\"vertical-align:top; width:473px\"><p>47.1&nbsp;&nbsp; Pursuant to the PCC, the Contractor including its Subcontractors/ suppliers/ manufacturers shall take all technical and organizational measures necessary to protect the information technology systems and data used in connection with the Contract. Without limiting the foregoing, the Contractor, including its Subcontractors/ suppliers/ manufacturers, shall use all reasonable efforts to establish, maintain, implement and comply with, reasonable information technology, information security, cyber security and data protection controls, policies and procedures, including oversight, access controls, encryption, technological and physical safeguards and business continuity/disaster recovery and security plans that are designed to protect against and prevent breach, destruction, loss, unauthorized distribution, use, access, disablement, misappropriation or modification, or other compromise or misuse of or relating to any information technology system or data used in connection with the Contract.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX </strong><strong>A</strong></p><p><strong>General Conditions of Dispute Board Agreement</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Definitions</p><p>Each &ldquo;Dispute Board Agreement&rdquo; is a tripartite agreement by and between:</p><p>the &ldquo;Employer&rdquo;;</p><p>the &ldquo;Contractor&rdquo;; and</p><p>the &ldquo;Member&rdquo; who is defined in the Dispute Board Agreement as being:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp; the sole member of the &ldquo;DB&rdquo; and, where this is the case, all references to the &ldquo;Other Members&rdquo; do not apply, or</p><p>(ii) &nbsp;&nbsp;&nbsp; one of the three persons who are jointly called the &ldquo;DB&rdquo; (or &ldquo;dispute board&rdquo;) and, where this is the case, the other two persons are called the &ldquo;Other Members&rdquo;.</p><p>The Employer and the Contractor have entered (or intend to enter) into a contract, which is called the &ldquo;Contract&rdquo; and is defined in the Dispute Board Agreement, which incorporates this Appendix. In the Dispute Board Agreement, words and expressions which are not otherwise defined shall have the meanings assigned to them in the Contract.</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Provisions</p><p>Unless otherwise stated in the Dispute Board Agreement, it shall take effect on the latest of the following dates:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; the Commencement Date defined in the Contract,</p><p>(b)&nbsp; &nbsp;&nbsp; when the Employer, the Contractor and the Member have each signed the Dispute Board Agreement, or</p><p>(c) &nbsp;&nbsp;&nbsp; when the Employer, the Contractor and each of the Other Members (if any) have respectively each signed a dispute board agreement.</p><p>This employment of the Member is a personal appointment. At any time, the Member may give not less than 70 days&rsquo; notice of resignation to the Employer and to the Contractor, and the Dispute Board Agreement shall terminate upon the expiry of this period.</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Warranties</p><p>The Member warrants and agrees that he/she is and shall be impartial and independent of the Employer, the Contractor and the Project Manager. The Member shall promptly disclose, to each of them and to the Other Members (if any), any fact or circumstance which might appear inconsistent with his/her warranty and agreement of impartiality and independence.</p><ol><li>When appointing the Member, the Employer and the Contractor relied upon the Member&rsquo;s representations that he/she is:has at least a bachelor&rsquo;s degree in relevant disciplines such as law, engineering, construction management or contract management;&nbsp;</li><li>has at least ten years of experience in contract administration/management and dispute resolution, out of which at least five years of experience as an arbitrator or adjudicator in construction-related disputes;</li><li>has received formal training as an adjudicator from an internationally recognized organization;&nbsp;</li><li>has experience and/or is knowledgeable in the type of work which the Contractor is to carry out under the Contract;</li><li>has experience in the interpretation of construction and/or engineering contract documents; and</li><li>is fluent in the language for communications defined in GCC Sub-Clause 5.3 (or the language as agreed between the Parties and the DB).</li></ol><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Obligations of the Member</p><p>The Member shall:</p><p>(a) &nbsp;&nbsp;&nbsp; have no interest financial or otherwise in the Employer, the Contractor or the Project Manager, nor any financial interest in the Contract except for payment under the Dispute Board Agreement;</p><p>(b) &nbsp;&nbsp;&nbsp; not previously have been employed as a consultant or otherwise by the Employer, the Contractor or the Project Manager, except in such circumstances as were disclosed in writing to the Employer and the Contractor before they signed the Dispute Board Agreement;</p><p>(c) &nbsp;&nbsp;&nbsp; have disclosed in writing to the Employer, the Contractor and the Other Members (if any), before entering into the Dispute Board Agreement and to his/her best knowledge and recollection, any professional or personal relationships with any director, officer or employee of the Employer, the Contractor or the Project Manager, and any previous involvement in the overall project of which the Contract forms part;</p><p>(d)&nbsp; &nbsp;&nbsp; not, for the duration of the Dispute Board Agreement, be employed as a consultant or otherwise by the Employer, the Contractor or the Project Manager, except as may be agreed in writing by the Employer, the Contractor and the Other Members (if any);</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp; comply with the annexed procedural rules and with GCC Sub-Clause 46.3;</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; not give advice to the Employer, the Contractor, the Employer&rsquo;s Personnel or the Contractor&rsquo;s &nbsp;Personnel concerning the conduct of the Contract, other than in accordance with the annexed procedural rules;</p><p>(g)&nbsp;&nbsp;&nbsp;&nbsp; not while a Member enter into discussions or make any agreement with the Employer, the Contractor or the Project Manager regarding employment by any of them, whether as a consultant or otherwise, after ceasing to act under the Dispute Board Agreement;</p><p>(h)&nbsp;&nbsp;&nbsp;&nbsp; ensure his/her availability for all site visits and hearings as are necessary;</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; become conversant with the Contract and with the progress of the Facilities (and of any other parts of the project of which the Contract forms part) by studying all documents received which shall be maintained in a current working file;</p><p>(j)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; treat the details of the Contract and all the DB&rsquo;s activities and hearings as private and confidential, and not publish or disclose them without the prior written consent of the Employer, the Contractor and the Other Members (if any); and</p><p>(k)&nbsp;&nbsp;&nbsp;&nbsp; be available to give advice and opinions, on any matter relevant to the Contract when requested by both the Employer and the Contractor, subject to the agreement of the Other Members (if any).</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; General Obligations of the Employer and the Contractor</p><p>The Employer, the Contractor, the Employer&rsquo;s Personnel and the Contractor&rsquo;s Personnel shall not request advice from or consultation with the Member regarding the Contract, otherwise than in the normal course of the DB&rsquo;s activities under the Contract and the Dispute Board Agreement. The Employer and the Contractor shall be responsible for compliance with this provision, by the Employer&rsquo;s Personnel and the Contractor&rsquo;s &nbsp;Personnel respectively.</p><p>The Employer and the Contractor undertake to each other and to the Member that the Member shall not, except as otherwise agreed in writing by the Employer, the Contractor, the Member and the Other Members (if any):</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; be appointed as an arbitrator in any arbitration under the Contract;</p><p>(b)&nbsp;&nbsp;&nbsp;&nbsp; be called as a witness to give evidence concerning any dispute before arbitrator(s) appointed for any arbitration under the Contract; or</p><p>(c)&nbsp;&nbsp;&nbsp;&nbsp; be liable for any claims for anything done or omitted in the discharge or purported discharge of the Member&rsquo;s functions, unless the act or omission is shown to have been in bad faith.</p><p>The Employer and the Contractor hereby jointly and severally indemnify and hold the Member harmless against and from claims from which he is relieved from liability under the preceding paragraph.</p><p>Whenever the Employer or the Contractor refers a dispute to the DB under GCC Sub-Clause 46.3, which will require the Member to make a site visit and attend a hearing, the Employer or the Contractor shall provide appropriate security for a sum equivalent to the reasonable expenses to be incurred by the Member. No account shall be taken of any other payments due or paid to the Member.</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Payment</p><p>The Member shall be paid as follows, in the currency named in the Dispute Board Agreement:</p><p>(a)&nbsp;&nbsp;&nbsp;&nbsp; a retainer fee per calendar month, which shall be considered as payment in full for:</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; being available on 28 days&rsquo; notice for all site visits and hearings;</p><p>(ii)&nbsp;&nbsp;&nbsp; becoming and remaining conversant with all project developments and maintaining relevant files;</p><p>(iii) &nbsp;&nbsp; all office and overhead expenses including secretarial services, photocopying and office supplies incurred in connection with his duties; and</p><p>(iv) &nbsp;&nbsp; all services performed hereunder except those referred to in sub-paragraphs (b) and (c) of this Clause.</p><p>The retainer fee shall be paid with effect from the last day of the calendar month in which the Dispute Board Agreement becomes effective; until the last day of the calendar month in which the Taking-Over Certificate is issued for the whole of the Facilities.</p><p>With effect from the first day of the calendar month following the month in which Taking-Over Certificate is issued for the whole of the Facilities, the retainer fee shall be reduced by one third This reduced fee shall be paid until the first day of the calendar month in which the Member resigns or the Dispute Board Agreement is otherwise terminated.</p><p>(b) &nbsp;&nbsp;&nbsp; a daily fee which shall be considered as payment in full for:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp; each day or part of a day up to a maximum of two days&rsquo; travel time in each direction for the journey between the Member&rsquo;s home and the site, or another location of a meeting with the Other Members (if any);</p><p>(ii) &nbsp;&nbsp;&nbsp; each working day on site visits, hearings or preparing decisions; and</p><p>(iii) &nbsp;&nbsp; each day spent reading submissions in preparation for a hearing.</p><p>(c)&nbsp; &nbsp;&nbsp; all reasonable expenses including necessary travel expenses (air fare in less than first class, hotel and subsistence and other direct travel expenses) incurred in connection with the Member&rsquo;s duties, as well as the cost of telephone calls, courier charges, faxes and telexes: a receipt shall be required for each item in excess of five percent of the daily fee referred to in sub-paragraph (b) of this Clause;</p><p>(d)&nbsp;&nbsp;&nbsp;&nbsp; any taxes properly levied in the Country on payments made to the Member (unless a national or permanent resident of the Country) under this Clause 6.</p><p>The retainer and daily fees shall be as specified in the Dispute Board Agreement. Unless it specifies otherwise, these fees shall remain fixed for the first 24 calendar months and shall thereafter be adjusted by agreement between the Employer, the Contractor and the Member, at each anniversary of the date on which the Dispute Board Agreement became effective.</p><p>If the Parties fail to agree on the retainer fee or the daily fee the appointing entity or official named in the PCC shall determine the amount of the fees to be used.</p><p>The Member shall submit invoices for payment of the monthly retainer and air fares quarterly in advance. Invoices for other expenses and for daily fees shall be submitted following the conclusion of a site visit or hearing. All invoices shall be accompanied by a brief description of activities performed during the relevant period and shall be addressed to the Contractor.</p><p>The Contractor shall pay each of the Member&rsquo;s invoices in full within 56 calendar days after receiving each invoice and shall apply to the Employer (in the Statements under the Contract) for reimbursement of one-half of the amounts of these invoices. The Employer shall then pay the Contractor in accordance with the Contract.</p><p>If the Contractor fails to pay to the Member the amount to which he/she is entitled under the Dispute Board Agreement, the Employer shall pay the amount due to the Member and any other amount which may be required to maintain the operation of the DB; and without prejudice to the Employer&rsquo;s rights or remedies. In addition to all other rights arising from this default, the Employer shall be entitled to reimbursement of all sums paid in excess of one-half of these payments, plus all costs of recovering these sums and financing charges calculated at the rate specified in accordance with GCC Sub-Clause 12.3.</p><p>If the Member does not receive payment of the amount due within 70 days after submitting a valid invoice, the Member may (i) suspend his/her services (without notice) until the payment is received, and/or (ii) resign his/her appointment by giving notice under Clause 7.</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Termination</p><p>At any time: (i) the Employer and the Contractor may jointly terminate the Dispute Board Agreement by giving 42 days&rsquo; notice to the Member; or (ii) the Member may resign as provided for in Clause 2.</p><p>If the Member fails to comply with the Dispute Board Agreement, the Employer and the Contractor may, without prejudice to their other rights, terminate it by notice to the Member. The notice shall take effect when received by the Member.</p><p>If the Employer or the Contractor fails to comply with the Dispute Board Agreement, the Member may, without prejudice to his other rights, terminate it by notice to the Employer and the Contractor. The notice shall take effect when received by them both.</p><p>Any such notice, resignation and termination shall be final and binding on the Employer, the Contractor and the Member. However, a notice by the Employer or the Contractor, but not by both, shall be of no effect.</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Default of the Member</p><p>If the Member fails to comply with any of his obligations under Clause 4 concerning his impartiality or independence in relation to the Employer or the Contractor, he/she shall not be entitled to any fees or expenses hereunder and shall, without prejudice to their other rights, reimburse each of the Employer and the Contractor for any fees and expenses received by the Member and the Other Members (if any), for proceedings or decisions (if any) of the DB which are rendered void or ineffective by the said failure to comply.</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Disputes</p><p>Any dispute or claim arising out of or in connection with this Dispute Board Agreement, or the breach, termination or invalidity thereof, shall be finally settled by institutional arbitration. If no other arbitration institute is agreed, the arbitration shall be conducted under the Rules of Arbitration of the International Chamber of Commerce by one arbitrator appointed in accordance with these Rules of Arbitration.</p><p>&nbsp;</p><p><strong>Appendix A</strong></p><p><strong>DISPUTE BOARD GUIDELINES</strong></p><p>1. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Unless otherwise agreed by the Employer and the Contractor, the DB shall visit the site at intervals of not more than 140 days, including times of critical construction events, at the request of either the Employer or the Contractor. Unless otherwise agreed by the Employer, the Contractor and the DB, the period between consecutive visits shall not be less than 70 days, except as required to convene a hearing as described below.</p><p>2. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The timing of and agenda for each site visit shall be as agreed jointly by the DB, the Employer and the Contractor, or in the absence of agreement, shall be decided by the DB. The purpose of site visits is to enable the DB to become and remain acquainted with the progress of the execution of the Contract and of any actual or potential problems or claims, and, as far as reasonable, to prevent potential problems or claims from becoming disputes.</p><p>3.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Site visits shall be attended by the Employer, the Contractor and the Project Manager and shall be coordinated by the Employer in co-operation with the Contractor. The Employer shall ensure the provision of appropriate conference facilities and secretarial and copying services. At the conclusion of each site visit and before leaving the site, the DB shall prepare a report on its activities during the visit and shall send copies to the Employer and the Contractor.</p><p>4.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Employer and the Contractor shall furnish to the DB one copy of all documents which the DB may request, including Contract documents, progress reports, variation instructions, certificates and other documents pertinent to the performance of the Contract. All communications between the DB and the Employer or the Contractor shall be copied to the other Party. If the DB comprises three persons, the Employer and the Contractor shall send copies of these requested documents and these communications to each of these persons.</p><p>5.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; If any dispute is referred to the DB in accordance with GCC Sub-Clause 46.3, the DB shall proceed in accordance with GCC Sub-Clause 46.3 and these Guidelines. Subject to the time allowed to give notice of a decision and other relevant factors, the DB shall:</p><p>(a)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; act fairly and impartially as between the Employer and the Contractor, giving each of them a reasonable opportunity of putting his case and responding to the other&rsquo;s case, and</p><p>(b)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; adopt procedures suitable to the dispute, avoiding unnecessary delay or expense.</p><p>6.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The DB may conduct a hearing on the dispute, in which event it will decide on the date and place for the hearing and may request that written documentation and arguments from the Employer and the Contractor be presented to it prior to or at the hearing.</p><p>7. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Except as otherwise agreed in writing by the Employer and the Contractor, the DB shall have power to adopt an inquisitorial procedure, to refuse admission to hearings or audience at hearings to any persons other than representatives of the Employer, the Contractor and the Project Manager, and to proceed in the absence of any Party who the DB is satisfied received notice of the hearing; but shall have discretion to decide whether and to what extent this power may be exercised.</p><p>8.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Employer and the Contractor empower the DB, among other things, to:</p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; establish the procedure to be applied in deciding a dispute,</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon the DB&rsquo;s own jurisdiction, and as to the scope of any dispute referred to it,</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; conduct any hearing as it thinks fit, not being bound by any rules or procedures other than those contained in the Contract and these Guidelines,</p><p>(d) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; take the initiative in ascertaining the facts and matters required for a decision,</p><p>(e)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; make use of its own specialist knowledge, if any,</p><p>(f) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon the payment of financing charges in accordance with the Contract,</p><p>(g) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; decide upon any provisional relief such as interim or conservatory measures,</p><p>(h) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; open up, review and revise any certificate, decision, determination, instruction, opinion or valuation of the Project Manager, relevant to the dispute, and</p><p>(i)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; appoint, should the DB so consider necessary and the Parties agree, a suitable expert/s &nbsp;(including legal and technical expert(s)) at the cost of the Parties to give advice on a specific matter/s relevant to the dispute.</p><p>9.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The DB shall not express any opinions during any hearing concerning the merits of any arguments advanced by the Parties. Thereafter, the DB shall make and give its decision in accordance with GCC Sub-Clause 46.3, or as otherwise agreed by the Employer and the Contractor in writing. If the DB comprises three persons:</p><p>(a)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; it shall convene in private after a hearing, in order to have discussions and prepare its decision;</p><p>(b)&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; it shall endeavor to reach a unanimous decision: if this proves impossible the applicable decision shall be made by a majority of the Members, who may require the minority Member to prepare a written report for submission to the Employer and the Contractor; and</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;if a Member fails to attend a meeting or hearing, or to fulfil any required function, the other two Members may nevertheless proceed to make a decision, unless:</p><p>(i)&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; either the Employer or the Contractor does not agree that they do so, or</p><p>(ii) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the absent Member is the chairman and he/she instructs the other Members to not make a decision.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX B</strong></p><p>&nbsp;</p><p><strong>Fraud and Corruption</strong></p><p><strong><em>(Text in this Appendix shall not be modified)</em></strong></p><ol><li><strong>Purpose</strong><ol><li>The Bank&rsquo;s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.</li></ol></li><li><strong>Requirements</strong></li></ol><ol><li>The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.</li><li>To this end, the Bank:</li></ol><ol><li>Defines, for the purposes of this provision, the terms set forth below as follows:</li></ol><ol><li>&ldquo;corrupt practice&rdquo; is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;</li><li>&ldquo;fraudulent practice&rdquo; is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;</li><li>&ldquo;collusive practice&rdquo; is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;</li><li>&ldquo;coercive practice&rdquo; is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;</li><li>&ldquo;obstructive practice&rdquo; is:</li></ol><ol><li>deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or</li><li>acts intended to materially impede the exercise of the Bank&rsquo;s inspection and audit rights provided for under paragraph 2.2 e. below.</li></ol><ol><li>Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;</li><li>In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time&nbsp; they knew of the practices;</li><li>Pursuant to the Bank&rsquo;s Anti- Corruption Guidelines and in accordance with the Bank&rsquo;s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[15] (ii) to be a nominated[16] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;</li><li>Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents, personnel, permit the Bank to inspect[17] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX C</strong></p><p><strong>Metrics for Progress Reports- Environmental and Social (ES)</strong></p><p><em>Metrics for regular reporting:</em></p><ol><li><ol><li><ol><li><ol><li><ol><li><em>environmental incidents or non-compliances with contract requirements, including contamination, pollution or damage to ground or water supplies;</em></li><li><em>health and safety incidents, accidents, injuries that require treatment and all fatalities; </em></li><li><em>interactions with regulators:&nbsp; identify agency, dates, subjects, outcomes (report the negative if none);</em></li><li><em>status of all permits and agreements: </em></li></ol></li></ol></li></ol></li></ol></li><li>work permits: number required, number received, actions taken for those not received;</li><li>status of permits and consents:</li></ol><ul><li>list areas with landowner agreements required (camp sites), dates of agreements, dates submitted to the engineer (or equivalent);</li><li>identify major activities undertaken in each area in the reporting period and highlights of environmental and social protection (land clearing, boundary marking, topsoil salvage, traffic management, decommissioning planning, decommissioning implementation);<ol><li><ol><li><ol><li><ol><li><em>health and safety supervision: </em></li></ol></li></ol></li></ol></li></ol></li></ul><ol><li>safety officer: number days worked, number of full inspections &amp; partial inspections, reports to construction/project management;</li><li>number of workers, work hours, metric of PPE use (percentage of workers with full personal protection equipment (PPE), partial, etc.), worker violations observed (by type of violation, PPE or otherwise), warnings given, repeat warnings given, follow-up actions taken (if any);<ol><li><ol><li><ol><li><ol><li><em>worker accommodations:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>number of expats housed in accommodations, number of locals;</li><li>date of last inspection, and highlights of inspection including status of accommodations&rsquo; compliance with national and local law and good practice, including sanitation, space, etc.;</li><li>actions taken to recommend/require improved conditions, or to improve conditions.<ol><li><ol><li><ol><li><ol><li><em>Health services: provider of health services, information and/or training, location of clinic, number of non-safety disease or illness treatments and diagnoses (no names to be provided);</em></li><li><em>gender (for expats and locals separately): number of female workers, percentage of workforce, gender issues raised and dealt with (cross-reference grievances or other sections as needed);</em></li><li><em>training:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>number of new workers, number receiving induction training, dates of induction training;</li><li>number and dates of toolbox talks, number of workers receiving Occupational Health and Safety (OHS), environmental and social training;</li><li>number and dates of communicable diseases (including STDs) sensitization and/or training, no. workers receiving training (in the reporting period and in the past); same questions for gender sensitization, flag person training.</li><li>number and date of SEA prevention and SH sensitization and/or training events, including number of workers receiving training on Code of Conduct for Contractor&rsquo;s Personnel (in the reporting period and in the past), etc.<ol><li><ol><li><ol><li><ol><li><em>environmental and social supervision:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>environmental: days worked, areas inspected and numbers of inspections of each (road section, work camp, accommodations, quarries, borrow areas, spoil areas, swamps, forest crossings, etc.), highlights of activities/findings (including violations of environmental and/or social best practices, actions taken), reports to environmental and/or social specialist/construction/site management;</li><li>social: days worked, number of partial and full site inspections (by area: road section, work camp, accommodations, quarries, borrow areas, spoil areas, clinic, HIV/AIDS center, community centers, etc.), highlights of activities (including violations of environmental and/or social requirements observed, actions taken), reports to environmental and/or social specialist/construction/site management; and</li><li>community liaison person(s): days worked (hours community center open), number of people met, highlights of activities (issues raised, etc.), reports to environmental and/or social specialist /construction/site management.<ol><li><ol><li><ol><li><ol><li><em>Grievances: list new grievances (e.g., number of allegations of SEA and SH) received in the reporting period and number of unresolved past grievances by date received, complainant&rsquo;s age and sex, how received, to whom referred to for action, resolution and date (if completed), data resolution reported to complainant, any required follow-up (Cross-reference other sections as needed):</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>Worker grievances;</li><li>Community grievances<ol><li><ol><li><ol><li><ol><li><em>Traffic, road safety and vehicles/equipment:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>traffic and road safety incidents and accidents involving project vehicles &amp; equipment: provide date, location, damage, cause, follow-up;</li><li>traffic and road safety incidents and accidents involving non-project vehicles or property (also reported under immediate metrics): provide date, location, damage, cause, follow-up;</li><li>overall condition of vehicles/equipment (subjective judgment by environmentalist); non-routine repairs and maintenance needed to improve safety and/or environmental performance (to control smoke, etc.).<ol><li><ol><li><ol><li><ol><li><em>Environmental mitigations and issues (what has been done):</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>erosion control: controls implemented by location, status of water crossings, environmentalist inspections and results, actions taken to resolve issues, emergency repairs needed to control erosion/sedimentation;</li><li>spill clean-ups, if any:&nbsp; material spilled, location, amount, actions taken, material disposal (report all spills that result in water or soil contamination;</li><li>waste management: types and quantities generated and managed, including amount taken offsite (and by whom) or reused/recycled/disposed on-site;</li><li>details of tree plantings and other mitigations required undertaken in the reporting period;<ol><li><ol><li><ol><li><ol><li><em>compliance:</em></li></ol></li></ol></li></ol></li></ol></li></ol><ol><li>compliance status for conditions of all relevant consents/permits, for the Work, etc.): statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance;</li><li>compliance status of C-ESMP/ESIP requirements: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>compliance status of SEA and SH prevention and response action plan: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>compliance status of Health and Safety Management Plan re: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance</li><li>other unresolved issues from previous reporting periods related to environmental and social: continued violations, continued failure of equipment, continued lack of vehicle covers, spills not dealt with, continued compensation or blasting issues, etc.&nbsp; Cross-reference other sections as needed.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>APPENDIX D </strong></p><p><strong>Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Performance Declaration for Subcontractors</strong></p><p>&nbsp;</p><p><em>[</em><em>The following table shall be filled in by each subcontractor proposed by the Contractor, that was not named in the Contract]</em></p><p>Subcontractor&rsquo;s Name: <em>[insert full name]</em><br />Date: <em>[insert day, month, year]</em><br />Contract reference <em>[insert contract reference]</em><br />Page <em>[insert page number] </em>of <em>[insert total number] </em>pages<br />&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:626px\"><p><strong>SEA and/or SH Declaration </strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p>We:</p><p>&uml;&nbsp; (a) have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.</p><p>&uml;&nbsp; (b) are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.</p><p>&uml;&nbsp; (c) had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. An arbitral award on the disqualification case has been made in our favor.</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:626px\"><p><strong>[</strong><strong><em>If (c) above is applicable</em></strong><strong>, <em>attach evidence of an arbitral award reversing the findings on the issues underlying the disqualification.]</em></strong></p></td></tr></tbody></table><p>&nbsp;</p><p>Name of the Subcontractor<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name of the person duly authorized to sign on behalf of the Subcontractor<u> _______</u></p><p>Title of the person signing on behalf of the Subcontractor<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________</u></p><p>Signature of the person named above<u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________</u></p><p>Date signed ________________________________ day of ___________________, _____</p><p>Countersignature of authorized representative of the Contractor:</p><p>Signature: ________________________________________________________</p><p>Date signed ________________________________ day of ___________________, _____</p><p>&nbsp;</p><p><strong>Section IX - Particular Conditions of Contract</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:600px\"><p>The following Particular Conditions of Contract shall supplement the General Conditions of Contract in Section VIII. Whenever there is a conflict, the provisions herein shall prevail over those in the General Conditions.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Particular Conditions of Contract (PCC)</strong></p><p>The following Particular Conditions (PCC) shall supplement the General Conditions (GCC).&nbsp; Whenever there is a conflict, the provisions herein shall prevail over those in the GCC.&nbsp; The clause number of the PCC is the corresponding clause number of the GCC.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:138px\"><p><strong>PCC 1. Definitions</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:462px\"><p>The Employer is:&nbsp; <strong><em>Eswatini Electricity Company</em></strong></p><p>The Project Manager is: <strong><em>Mr. Senzo Shongwe</em></strong></p><p>The Bank is: <strong><em>World Bank</em></strong></p><p>Country of Origin: all countries and territories as indicated in Section V of the bidding document, Eligible Countries.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 5. Law and Language</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 5.1 &nbsp;&nbsp;&nbsp;&nbsp; The Contract shall be interpreted in accordance with the laws of: <strong>Kingdom of Eswatini</strong></p><p>PCC 5.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The ruling language is: <strong><em>English</em></strong><em> </em></p><p>PCC 5.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The language for communications is: <strong><em>English</em></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 7. Scope of Facilities [Spare Parts] (GCC Clause 7)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 7.3&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Contractor agrees to supply spare parts for a period of years: <strong>five (5) years</strong></p><p><strong>Addition to PCC 7.3</strong></p><p>The Contractor shall carry sufficient inventories to ensure an ex-stock supply of consumable spares for the Plant. Other spare parts and components shall be supplied as promptly as possible, but at the most within six (6) months of placing the order and opening the letter of credit.&nbsp; In addition, in the event of termination of the production of spare parts, advance notification will be made to the Employer of the pending termination, with sufficient time to permit the Employer to procure the needed requirement.&nbsp; Following such termination, the Contractor will furnish to the extent possible and at no cost to the Employer the blueprints, drawings and specifications of the spare parts, if requested.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 8. Time for Commencement and Completion</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 8.1&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Contractor shall commence work on the Facilities within <strong>15 (fifteen) calendar days</strong> from the Effective Date for determining Time for Completion as specified in the Contract Agreement.</p><p>PCC 8.2&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Time for Completion of the whole of the Facilities shall be <strong>Six (6) months </strong>from the Effective Date as described in the Contract Agreement<em>.</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:149px; vertical-align:top; width:138px\"><p><strong>PCC 9. Contractor&rsquo;s Responsibilities</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:149px; vertical-align:top; width:462px\"><p>PCC 9.8&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The following sustainable procurement contractual provisions apply:</p><ul><li>The 11kV auto recloser must utilize vacuum interruption and be insulated with solid dielectrics.</li><li>The use of SF (Sulfur Hexafluoride) gas or insulating oils is strictly prohibited to minimize global warming potential and eliminate hazardous leaks.</li><li>The recloser manufacturing process shall be comply with the standard ISO 9001, Quality Management System.</li><li>The Recloser packaging material shall be recyclable.</li><li>The recloser shall be almost maintenance free throughout its life expectancy.</li></ul></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 11. Contract Price</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 11.2&nbsp;&nbsp;&nbsp; The Contract Price shall be a firm lump sum.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 12. Terms of Payment</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p><em>PCC 12.5&nbsp;&nbsp; </em>An amount equivalent to 2% of the Contract price.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 13. Securities</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 13.3.1 The amount of Performance Security, as a percentage of the Contract Price for the Facility or for the part of the Facility for which a separate Time for Completion is provided, shall be: <strong>Ten (10%)</strong> of the Total Contract Price.</p><p>PCC 13.3.2 The Performance Security shall be in the form of the <strong>Bank Guarantee</strong> attached hereto in Section X, Contract Forms.</p><p>The Performance Security shall be issued by any registered &quot;A&quot; class commercial Bank in Kingdom of Eswatini, or a Foreign Bank. If Performance Security will be issued by a Foreign Bank, it shall be counter guaranteed by any registered &quot;A&quot; class commercial Bank in Kingdom of Eswatini. The performance security as required by the clause 13.3.1 above shall be valid for period covering entire contract execution period and any extension thereof plus defect liability period plus three months.</p><p>PCC 13.3.3 The Performance Security shall not be reduced on the date of the Operational Acceptance.</p><p>PCC 13.3.3 The Performance Security shall be reduced to ten percent (10%) of the value of the component covered by the extended defect liability to cover the Contractor&rsquo;s extended defect liability in accordance with the provision in the PCC, pursuant to GCC Sub-Clause 27.10.&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 15. License/Use of Technical Information</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 15.2 <strong>Add the following as second paragraph:</strong></p><p>The Employer shall have the right to reproduce any or all drawings, documents and other materials furnished to the Employer for the purpose of the Contract and in addition, if required, for operation and maintenance.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 18. Progress Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p><em>PCC 18.3&nbsp;&nbsp; </em>Progress reports shall include status of compliance to cyber security risks management, and any foreseeable cyber security risk and mitigation.</p><p>Potential and occurred cyber security incidents are to be immediately reported</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 21. Procurement</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 21.3.2 <strong>Add the following to the clause:</strong></p><p>The Employer shall in no way be responsible for the condition of road and access.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 22 Installation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC22.2.5 Working Hours</p><p>Normal working hours are: 0800hrs to 1700hrs (Monday to Friday)</p><p>PCC 22.2.8 Funeral Arrangements: as specified in the GCC.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 23. Tests and Inspection</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 23.2 <strong>Supplement GCC 23.2 with the following:</strong></p><p>For tests / inspections and training, the Contractor will arrange and pay for the visa fee, accommodation in the international and local travel of two (02) representatives of the employer i.e. - air tickets; local transport; accommodation.</p><p>PCC 23.3 <strong>Supplement GCC 23.3 with the following:</strong></p><p>The Contractor shall furnish the Project Manager with the details of the program of the tests and/or inspection and of the place and time thereof at least two (2) weeks in advance in case of domestic supplies &amp; six (6) weeks in advance in case of foreign supplies.</p><p>PCC 23.4 <strong>Supplement GCC 23.3 with the following:</strong></p><p>The Contractor shall provide the Project Manager with a certified report of the results of any such test and/or inspection within fifteen (15) days after completion of tests.</p><p>PCC 23.6 <strong>Add the following at the end of GCC 23.6:</strong></p><p>All costs incurred by the Employer including all travelling and board and lodging expenses by the repetition of the tests or false call for tests shall be borne by the Contractor pursuant to GCC Sub-Clause 23.2. Any delay in delivery due to retest or false call shall not constitute a release of the Contractor from his responsibilities for delay.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 25. Commissioning and Operational Acceptance</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 25.2.2 The Guarantee Test of the Facilities shall be successfully completed within <strong>one (1) month</strong> from the date of Completion.</p><p>PCC 25.3.1(e) <strong>Add the following new sub-clause:</strong></p><p>Three (3) sets of as built drawings, operating and maintenance manuals and USB drives etc.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 26. Completion Time Guarantee</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 26.2</p><p>Applicable rate for liquidated damages: <strong>1% per week</strong></p><p>The above rate applies to the price of the part of the Facilities, as quoted in the Price Schedule, for that part for which the Contractor fails to achieve Completion within the particular Time for Completion.&nbsp;</p><p>Maximum deduction for liquidated damages: <strong>10</strong><strong><em>% of the Contract Price</em></strong></p><p>PCC 26.3&nbsp;&nbsp;&nbsp; Applicable <em>(amount or rate)</em> for the bonus for early Completion:</p><p>Maximum bonus: <strong>N/A</strong></p><p>PCC 26.3&nbsp;&nbsp;&nbsp; No bonus will be given for earlier Completion of the Facilities or part thereof.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 27. Defect Liability</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 27.10&nbsp; The critical components covered under the extended defect liability are <strong>None</strong>.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 30. Limitation of Liability</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 30.1 (b) The multiplier of the Contract Price is: <strong><em>one (1)</em></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 39. Value Engineering</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 39.1.2 If the value engineering proposal is approved by the Employer the amount to be paid to the Contractor shall be <strong>50 %</strong> of the reduction in the Contract Price</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 39.2.1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>(f) A &ldquo;Change Proposal,&rdquo; which shall include the following:</p><ul><li>Effect on the Resource mobilization schedule</li><li>Effect on Risk Register</li><li>Effect on the payment schedule.</li></ul><p>The Contractor shall implement and maintain appropriate administrative, technical, and physical safeguards to protect the Telecoms network, SCADA system, associated networks, software, hardware, and operational technology assets from unauthorized access, misuse, alteration, disruption, destruction, or disclosure.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC46. Disputes and Arbitration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 46.1&nbsp;&nbsp;&nbsp; The DB shall be appointed within 30 days after a dispute has been declared by either party of the Contract Agreement PCC 46.1</p><p>The DB shall be: comprised of <strong>one (1) person</strong>, who is fluent in the English language and shall be a professional experienced in the type of activities involved in the performance of the Contract and with the interpretation of contractual documents. The potential member is an independent and neutral with no interest in the Contract.</p><p>&nbsp;</p><p>PCC 46.1 List of potential DB members:</p><p><strong>List of arbitrators of the Association of Arbitrators (Southern Africa)</strong> (to be defined at contract signing).</p><p>Proposed by Contractor <em>[Attach CVs to the Contract]</em></p><p><strong><em>List of arbitrators of the Association of Arbitrators</em></strong><em> (Southern Africa) (to be defined at contract signing).</em></p><p>&nbsp;</p><p>PCC 46.2 Appointment (if not agreed) to be made by: <strong><em>Association of Arbitrators (Southern Africa)</em></strong></p><p>PCC 46.5 &nbsp;&nbsp; Procedure to settle disputes in respect of which DB&rsquo;s decision (if any) has not become final and binding shall be finally settled by arbitration:</p><p><strong>Rules of arbitration</strong></p><p>GCC Sub-Clause 46.5(a): For a Foreign Contractor, <em>the dispute shall be finally settled under the Rules of the Rules of the Conduct of Arbitrations (5th Edition 2005) of the Association of Arbitrators (Southern Africa); by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be the neutral location agreed by both parties.</em></p><p>&nbsp;</p><p>GCC Sub-Clause 46.5 (b): For a local Contractor, the dispute shall be finally settled under the Rules of the Rules of the Conduct of Arbitrations (5th Edition 2005) of the Association of Arbitrators (Southern Africa) within the context of the Law of Eswatini; by one or three arbitrators appointed in accordance with these Rules. The place of arbitration shall be in Eswatini.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\"><p><strong>PCC 47. </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:462px\"><p>PCC 47.1- The Contractor shall comply with the following Cyber security requirements:</p><p>1. Comply with IEC 62443 (Industrial Automation and Control Systems cybersecurity).</p><p>2. Support IEC 62351 security measures for power system communications, including secure DNP3 communications where applicable.</p><p>3. Meet the cybersecurity capability requirements of IEEE 1686 for Intelligent Electronic Devices (IEDs).</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:123px; width:613px\"><p><strong>Section X - Contract Forms</strong></p></td></tr></tbody></table><p><strong>Table of Forms</strong></p><p><strong>Notification of Intention to Award. 298</strong></p><p><strong>Letter of Acceptance. 305</strong></p><p><strong>Contract Agreement 306</strong></p><p>Appendix 1.&nbsp; Terms and Procedures of Payment 310</p><p>Appendix 2.&nbsp; Price Adjustment 313</p><p>Appendix 3.&nbsp; Insurance Requirements. 315</p><p>Appendix 4.&nbsp; Time Schedule. 318</p><p>Appendix 5.&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors. 319</p><p>Appendix 6.&nbsp; Scope of Works and Supply by the Employer 320</p><p>Appendix 7.&nbsp; List of Documents for Approval or Review.. 321</p><p>Appendix 8.&nbsp; Functional Guarantees. 322</p><p><strong>Performance Security Form&ndash; Bank Guarantee. 324</strong></p><p><strong>Performance Security Form- Conditional Bank Guarantee. 327</strong></p><p><strong>Advance Payment Security. 329</strong></p><p>&nbsp;</p><p><strong>Notification of Intention to Award</strong></p><p>&nbsp;</p><p><strong>[<em>This Notification of Intention to Award shall be sent to each Bidder that submitted a Bid, unless the Bidder has previously received notice of exclusion from the process at an interim stage of the procurement process</em>]</strong></p><p><strong>[<em>Send this Notification to the Bidder&rsquo;s Authorized Representative named in the Bidder Information Form</em>]</strong></p><p>For the attention of Bidder&rsquo;s Authorized Representative</p><p>Name: <em>[insert Authorized Representative&rsquo;s name]</em></p><p>Address: <em>[insert Authorized Representative&rsquo;s Address]</em></p><p>Telephone/Fax numbers: <em>[insert Authorized Representative&rsquo;s telephone/fax numbers]</em></p><p>Email Address: <em>[insert Authorized Representative&rsquo;s email address]</em></p><p><strong><em>[IMPORTANT: insert the date that this Notification is transmitted to all participating Bidders. The Notification must be sent to all Bidders simultaneously. This means on the same date and as close to the same time as possible.]&nbsp; </em></strong></p><p><strong>DATE OF TRANSMISSION</strong>: This Notification is sent by: [<em>email/fax</em>] on [<em>date</em>] (local time)</p><p><strong>Notification of Intention to Award</strong></p><p><strong>Employer</strong><strong>: </strong><em>[insert the name of the Employer]</em></p><p><strong>Project:<em> </em></strong><em>[insert name of project]</em></p><p><strong>Contract title</strong><strong>: </strong><em>[insert the name of the contract]</em></p><p><strong>Country: </strong><em>[insert country where RFB is issued]</em></p><p><strong>Loan No. /Credit No. / Grant No.:</strong><em> [insert reference number for loan/credit/grant]</em></p><p><strong>RFB No: </strong><em>[insert RFB reference number from Procurement Plan]</em></p><p>This Notification of Intention to Award (Notification) notifies you of our decision to award the above contract. The transmission of this Notification begins the Standstill Period. During the Standstill Period, you may:</p><ol><li>request a debriefing in relation to the evaluation of your Bid, and/or</li><li>submit a Procurement-related Complaint in relation to the decision to award the contract.</li></ol><ol><li><strong>The successful Bidder</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:604px\"><tbody><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:141px\"><p><strong>Name:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:463px\"><p>[<em>insert name</em> <em>of successful Bidder</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p><strong>Address:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p>[<em>insert address</em> <em>of the successful Bidder</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p><strong>Contract price:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p>[<em>insert contract price</em> <em>of the successful Bid</em>]</p></td></tr><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:141px\"><p>Total combined score:</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:463px\"><p><em>[insert the total combined score of the successful Bidder]</em></p></td></tr></tbody></table><ol><li><strong>Other Bidders <em>[INSTRUCTIONS: insert names of all Bidders that submitted a Bid, Bid prices as read out and evaluated, technical scores and&nbsp; combined scores.]</em></strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:599px\"><tbody><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:127px\"><p><strong>Name of Bidder</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:107px\"><p><strong>Technical Score</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:99px\"><p><strong>Bid Price</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:123px\"><p><strong>Evaluated Bid Cost</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:143px\"><p><strong>Combined Score</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:127px\"><p>[<em>insert name</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:107px\"><p><em>[insert Technical score]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:99px\"><p>[<em>insert Bid price</em>]</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:123px\"><p><em>[insert evaluated cost]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:143px\"><p><em>[insert combined score]</em></p></td></tr></tbody></table><ol><li><strong>Reason/s why your Bid was unsuccessful</strong><strong><em>[Delete if the combined score already reveals the reason]</em></strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p><strong><em>[INSTRUCTIONS: State the reason/s why <u>this</u> Bidder&rsquo;s Bid was unsuccessful. Do NOT include: (a) a point by point comparison with another Bidder&rsquo;s Bid or (b) information that is marked confidential by the Bidder in its Bid.]</em></strong></p></td></tr></tbody></table><ol><li><strong>How to request a debriefing</strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:637px\"><p><strong>DEADLINE: The deadline to request a debriefing expires at midnight on [<em>insert date</em>] (local time).</strong></p><p>You may request a debriefing in relation to the results of the evaluation of your Bid. If you decide to request a debriefing, your written request must be made within three (3) Business Days of receipt of this Notification of Intention to Award.</p><p>Provide the contract name, reference number, name of the Bidder, contact details; and address the request for debriefing as follows:</p><p><strong>Attention</strong>: [<em>insert full name of person, if applicable</em>]</p><p><strong>Title/position</strong>: [<em>insert title/position</em>]</p><p><strong>Agency</strong>: [<em>insert name of Employer</em>]</p><p><strong>Email address</strong>: [<em>insert email address</em>]</p><p><strong>Fax number</strong>: [<em>insert fax number</em>] <strong><em>delete if not used</em></strong></p><p>If your request for a debriefing is received within the 3 Business Days deadline, we will provide the debriefing within five (5) Business Days of receipt of your request. If we are unable to provide the debriefing within this period, the Standstill Period shall be extended by five (5) Business Days after the date that the debriefing is provided. If this happens, we will notify you and confirm the date that the extended Standstill Period will end.</p><p>The debriefing may be in writing, by phone, video conference call or in person. We shall promptly advise you in writing how the debriefing will take place and confirm the date and time.</p><p>If the deadline to request a debriefing has expired, you may still request a debriefing. In this case, we will provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of the Contract Award Notice.</p></td></tr></tbody></table><ol><li><strong>How to make a complaint </strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p>DEADLINE:<strong>:&nbsp; </strong>The deadline for submitting a Procurement-related Complaint challenging the decision to award the contract expires on midnight, [<em>insert date</em>] (local time).</p><p>Provide the contract name, reference number, name of the Bidder, contact details; and address the Procurement-related Complaint as follows:</p><p><strong>Attention</strong>: [<em>insert full name of person, if applicable</em>]</p><p><strong>Title/position</strong>: [<em>insert title/position</em>]</p><p><strong>Agency</strong>: [<em>insert name of Employer</em>]</p><p><strong>Email address</strong>: [<em>insert email address</em>]</p><p><strong>Fax number</strong>: [<em>insert fax number</em>] <strong><em>delete if not used</em></strong></p><p>At this point in the procurement process, you may submit a Procurement-related Complaint challenging the decision to award the contract. You do not need to have requested, or received, a debriefing before making this complaint. Your complaint must be submitted within the Standstill Period and received by us before the Standstill Period ends.</p><p><u>Further information</u>:</p><p>For more information see the Procurement Regulations for IPF Borrowers<u> (Procurement Regulations) </u>(Annex III). You should read these provisions before preparing and submitting your complaint. In addition, the World Bank&rsquo;s Guidance &ldquo;How to make a Procurement-related Complaint<u>&rdquo; </u>provides a useful explanation of the process, as well as a sample letter of complaint.</p><p>In summary, there are four essential requirements:</p><ol><li>You must be an &lsquo;interested party&rsquo;. In this case, that means a Bidder who submitted a Bid in this procurement and is the recipient of a Notification of Intention to Award.</li><li>The complaint can only challenge the decision to award the contract.</li><li>You must submit the complaint within the deadline stated above.</li><li>You must include, in your complaint, all of the information required by the Procurement Regulations (as described in Annex III).</li></ol></td></tr></tbody></table><ol><li><strong>Standstill Period </strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:601px\"><p><strong>DEADLINE: The Standstill Period is due to end at midnight on [<em>insert date</em>] (local time).</strong></p><p>The Standstill Period lasts ten (10) Business Days after the date of transmission of this Notification of Intention to Award.</p><p>The Standstill Period may be extended. This may happen where we are unable to provide a debriefing within the five (5) Business Day deadline. If this happens we will notify you of the extension</p></td></tr></tbody></table><p>If you have any questions regarding this Notification please do not hesitate to contact us.</p><p>On behalf of the Employer:</p><p><strong>Signature:</strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Name:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Title/position:</strong> ______________________________________________</p><p><strong>Telephone:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p><strong>Email:</strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ______________________________________________</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><table style=\"width:100%\"><tbody><tr><td><p><em>INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE FORM</em></p><p>&nbsp;</p><p><em>This Beneficial Ownership Disclosure Form (&ldquo;Form&rdquo;) is to be completed by the successful Bidder.&nbsp; In case of joint venture, the Bidder must submit a separate Form for each member.&nbsp; The beneficial ownership information to be submitted in this Form shall be current as of the date of its submission. </em></p><p>&nbsp;</p><p><em>For the purposes of this Form, a Beneficial Owner of a Bidder is any natural person who ultimately owns or controls the Bidder by meeting one or more of the following conditions:</em></p><ul><li><em>directly or indirectly holding 25% or more of the shares</em></li><li><em>directly or indirectly holding 25% or more of the voting rights</em></li><li><em>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder</em></li></ul></td></tr></tbody></table><p><br />Beneficial Ownership Disclosure Form</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>RFB No.:</strong> [<em>insert number of RFB process</em>]</p><p><strong>Request for Bid No</strong>.: [<em>insert identification</em>]</p><p>&nbsp;</p><p>To: <strong>[<em>insert complete name of Employer</em>]</strong></p><p>&nbsp;</p><p>In response to your request in the Letter of Acceptance <em>dated [insert date of letter of Acceptance]</em> to furnish additional information on beneficial ownership: <em>[select one option as applicable and delete the options that are not applicable] </em></p><p>&nbsp;</p><p>(i) we hereby provide the following beneficial ownership information.&nbsp;</p><p>&nbsp;</p><p><strong>Details of beneficial ownership </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:600px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:150px\"><p>Identity of Beneficial Owner</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:142px\"><p>Directly or indirectly holding 25% or more of the shares</p><p>(Yes / No)</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:158px\"><p>Directly or indirectly holding 25 % or more of the Voting Rights</p><p>(Yes / No)</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:28px; vertical-align:top; width:150px\"><p>Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent governing body of the Bidder</p><p>(Yes / No)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:150px\"><p><em>[include full name (last, middle, first), nationality, country of residence]</em></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:142px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:158px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:28px; vertical-align:top; width:150px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>OR</em></strong></p><p>&nbsp;</p><p>(ii) <em>We declare that there is no Beneficial Owner meeting one or more of the following conditions: </em></p><ul><li>directly or indirectly holding 25% or more of the shares</li><li>directly or indirectly holding 25% or more of the voting rights</li><li>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder</li></ul><p>&nbsp;</p><p><strong>OR </strong></p><p>&nbsp;</p><p><em>(iii) We declare that we are unable to identify any Beneficial Owner meeting one or more of the following conditions. [If this option is selected, the Bidder shall provide explanation on why it is unable to identify any Beneficial Owner]</em></p><ul><li>directly or indirectly holding 25% or more of the shares</li><li>directly or indirectly holding 25% or more of the voting rights</li><li>directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder]&rdquo;</li></ul><p>&nbsp;</p><p><strong>Name of the Bidder</strong>: *<u>[<em>insert complete name of the Bidder</em>]_________</u></p><p>&nbsp;</p><p><strong>Name of the person duly authorized to sign the Bid on behalf of the Bidder</strong>: **<u>[<em>insert complete name of person duly authorized to sign the Bid</em>]___________</u></p><p>&nbsp;</p><p><strong>Title of the person signing the Bid</strong>: <u>[<em>insert complete title of the person signing the Bid</em>]______</u></p><p>&nbsp;</p><p><strong>Signature of the person named above</strong>: <u>[<em>insert signature of person whose name and capacity are shown above</em>]_____</u></p><p>&nbsp;</p><p><strong>Date signed</strong> <u>[<em>insert date of signing</em>]</u> <strong>day of</strong> <u>[<em>insert month</em>], [<em>insert year</em>]_____</u></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>* In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder. In the event that the Bidder is a joint venture, each reference to &ldquo;Bidder&rdquo; in the Beneficial Ownership Disclosure Form (including this Introduction thereto) shall be read to refer to the joint venture member.</p><p>** Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Letter of Acceptance</strong></p><p><em>______________________</em></p><p>To:&nbsp; <em>____________________________</em></p><p>&nbsp;</p><p>This is to notify you that your Bid dated <em>____________</em> for execution of the <em>_________________</em> for the Contract Price in the aggregate of <em>_____________________ ________________</em>, as corrected and modified in accordance with the Instructions to Bidders is hereby accepted by our Agency.</p><p>&nbsp;</p><p>You are requested to furnish (i) the Performance Security within 28 days in accordance with the Conditions of Contract, using for that purpose one of the Performance Security Form<em>s</em> and (ii) the additional information on beneficial ownership in accordance with ITB 46.1, within eight (8) Business days using the Beneficial Ownership Disclosure Form, included in Section X, - Contract Forms, of the bidding document.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Authorized Signature:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name and Title of Signatory:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Name of Agency:&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>Attachment:&nbsp; Contract Agreement</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"height:60px; width:613px\"><p><strong>Contract Agreement</strong></p></td></tr></tbody></table><p>THIS AGREEMENT is made the ________ day of ________________________, _____,</p><p>BETWEEN</p><p>&nbsp;</p><p>(1)<strong>Eswatini Electricity Company</strong> a corporation incorporated under the laws of the kingdom of Eswatini and having its principal place of business at <strong>Eluvatsini house, Mhlambanyatsi Road Mbabane, Eswatini &nbsp;(</strong>hereinafter called &ldquo;the Employer&rdquo;), and (2) <em>______________________</em>, a corporation incorporated under the laws of <em>________________________</em> and having its principal place of business at <em>________________________</em> (hereinafter called &ldquo;the Contractor&rdquo;).</p><p>&nbsp;</p><p>WHEREAS the Employer desires to engage the Contractor to design, manufacture, test, deliver, install, complete and commission certain Facilities, viz. <strong>Design Supply and Installation<em> of 11kV auto reclosers under the Accelerating Sustainable and Clean Energy Access Transformation </em></strong><em>(ASCENT) Project </em>(&ldquo;the Facilities&rdquo;), and the Contractor has agreed to such engagement upon and subject to the terms and conditions hereinafter appearing.</p><p>&nbsp;</p><p>NOW IT IS HEREBY AGREED as follows:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:626px\"><tbody><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 1.&nbsp; Contract Documents</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>1.1&nbsp;&nbsp;&nbsp; <u>Contract Documents</u> (Reference GCC Clause 2)</p><p>The following documents shall constitute the Contract between the Employer and the Contractor, and each shall be read and construed as an integral part of the Contract:</p><p>(a)&nbsp;&nbsp;&nbsp; This Contract Agreement and the Appendices hereto</p><p>(b)&nbsp;&nbsp;&nbsp; Letter of Bid and Price Schedules submitted by the Contractor</p><p>(c)&nbsp;&nbsp;&nbsp; Particular Conditions</p><p>(d)&nbsp;&nbsp;&nbsp; General Conditions</p><p>(e)&nbsp;&nbsp;&nbsp; Specification</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; Drawings</p><p>(g)&nbsp;&nbsp;&nbsp; Other completed Bidding forms submitted with the Bid</p><p>(h)&nbsp;&nbsp;&nbsp; Any other documents forming part of the Employer&rsquo;s Requirements</p><p>(i)&nbsp;&nbsp;&nbsp; Any other documents forming part of the contract, including, but not limited to:</p><ol><li><ol><li><ol><li><strong>the ES Management Strategies and Implementation Plans; and</strong></li><li><strong>Code of Conduct for Contractor&rsquo;s Personnel (ES).</strong></li><li><strong>The SEA/SH prevention and Response Plan</strong></li><li><strong>Project ESMF</strong></li><li><strong>Project Labour Management </strong></li></ol></li></ol></li></ol><p>1.2&nbsp;&nbsp;&nbsp; <u>Order of Precedence</u> (Reference GCC Clause 2)</p><p>In the event of any ambiguity or conflict between the Contract Documents listed above, the order of precedence shall be the order in which the Contract Documents are listed in Article 1.1 (Contract Documents) above.</p><p>1.3&nbsp;&nbsp;&nbsp; <u>Definitions</u> (Reference GCC Clause 1)</p><p>Capitalized words and phrases used herein shall have the same meanings as are ascribed to them in the General Conditions.</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 2.&nbsp; Contract Price and Terms of Payment</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>2.1&nbsp;&nbsp;&nbsp; <u>Contract Price</u> (Reference GCC Clause 11)</p><p>The Employer hereby agrees to pay to the Contractor the Contract Price in consideration of the performance by the Contractor of its obligations hereunder.&nbsp; The Contract Price shall be the aggregate of:&nbsp; <em>__________________</em>, <em>_______________</em> as specified in Price Schedule No. 5 (Grand Summary), and<em>_______________</em>, <em>_________________</em>, or such other sums as may be determined in accordance with the terms and conditions of the Contract.</p><p>2.2&nbsp;&nbsp;&nbsp; <u>Terms of Payment</u> (Reference GCC Clause 12)</p><p>The terms and procedures of payment according to which the Employer will reimburse the Contractor are given in the Appendix (Terms and Procedures of Payment) hereto.</p><p>The Employer will not instruct its bank to issue an irrevocable confirmed documentary credit made available to the Contractor in a bank in the country of the Contractor. The credit shall be for an amount of <em>$0.00</em> and shall be subject to the Uniform Customs and Practice for Documentary Credits 2007 Revision, ICC Publication No. 600.</p><p>In the event that the amount payable under Schedule No. 1 is adjusted in accordance with GCC 11.2 or with any of the other terms of the Contract, the Employer shall arrange for the documentary credit to be amended accordingly.</p><p>&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 3.&nbsp; Effective Date </strong></p></td><td style=\"vertical-align:top; width:466px\"><p>3.1&nbsp;&nbsp;&nbsp; <u>Effective Date</u> (Reference GCC Clause 1)</p><p>The Effective Date from which the Time for Completion of the Facilities shall be counted is the date when all of the following conditions have been fulfilled:</p><p>(a)&nbsp;&nbsp;&nbsp; This Contract Agreement has been duly executed for and on behalf of the Employer and the Contractor;</p><p>(b)&nbsp;&nbsp;&nbsp; The Contractor has submitted to the Employer the Performance Security and the advance payment guarantee;</p><p>(c)&nbsp;&nbsp;&nbsp; The Employer has paid the Contractor the advance payment;</p><p>(f) Individual Letters from key personnel confirming availability</p><p>Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.</p><p>3.2&nbsp;&nbsp;&nbsp; If the conditions listed under 3.1 are not fulfilled within two (2) months from the date of this Contract notification because of reasons not attributable to the Contractor, the Parties shall discuss and agree on an equitable adjustment to the Contract Price and the Time for Completion and/or other relevant conditions of the Contract.</p></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 4.&nbsp; Communications</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>4.1&nbsp;&nbsp;&nbsp; The address of the Employer for notice purposes, pursuant to GCC 4.1 is: <em>______________________</em>.</p><ol><li><ol><li>The address of the Contractor for notice purposes, pursuant to GCC 4.1 is: <em>________________________.</em></li></ol></li></ol></td></tr><tr><td style=\"vertical-align:top; width:161px\"><p><strong>Article 5.&nbsp; Appendices</strong></p></td><td style=\"vertical-align:top; width:466px\"><p>5.1&nbsp;&nbsp;&nbsp; The Appendices listed in the attached List of Appendices shall be deemed to form an integral part of this Contract Agreement.</p><ol><li><ol><li>Reference in the Contract to any Appendix shall mean the Appendices attached hereto, and the Contract shall be read and construed accordingly.</li></ol></li></ol></td></tr></tbody></table><p>&nbsp;</p><p>IN WITNESS WHEREOF the Employer and the Contractor have caused this Agreement to be duly executed by their duly authorized representatives the day and year first above written.</p><p>&nbsp;</p><p>Signed by, for and on behalf of the Employer</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Signature]</em></p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Title]</em></p><p>&nbsp;</p><p>in the presence of <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>Signed by, for and on behalf of the Contractor</p><p>&nbsp;</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Signature]</em></p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p><em>[Title]</em></p><p>&nbsp;</p><p>in the presence of <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;</p><p>&nbsp;</p><p>APPENDICES</p><p>&nbsp;</p><p>Appendix 1&nbsp;&nbsp;&nbsp;&nbsp; Terms and Procedures of Payment</p><p>Appendix 2&nbsp;&nbsp;&nbsp;&nbsp; Price Adjustment</p><p>Appendix 3&nbsp;&nbsp;&nbsp;&nbsp; Insurance Requirements</p><p>Appendix 4&nbsp;&nbsp;&nbsp;&nbsp; Time Schedule</p><p>Appendix 5&nbsp;&nbsp;&nbsp;&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors</p><p>Appendix 6&nbsp;&nbsp;&nbsp;&nbsp; Scope of Works and Supply by the Employer</p><p>Appendix 7&nbsp;&nbsp;&nbsp;&nbsp; List of Documents for Approval or Review</p><p>Appendix 8&nbsp;&nbsp;&nbsp;&nbsp; Functional Guarantees</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 1.&nbsp; Terms and Procedures of Payment</strong></p><p>In accordance with the provisions of GCC Clause 12 (Terms of Payment), the Employer shall pay the Contractor in the following manner and at the following times, on the basis of the Price Breakdown given in the section on Price Schedules.&nbsp; Payments will be made in the currencies quoted by the Bidder unless otherwise agreed between the Parties.&nbsp; Applications for payment in respect of part deliveries may be made by the Contractor as work proceeds.</p><p>&nbsp;</p><p>TERMS OF PAYMENT</p><p>&nbsp;</p><p><u>Schedule No. 1.&nbsp; Plant and Equipment Supplied from Abroad</u></p><p>In respect of plant and equipment supplied from abroad, the following payments shall be made:</p><p>Ten percent (10%) of the total CIP amount as an advance payment against receipt of invoice and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of the plant and equipment delivered to the site, as evidenced by shipping and delivery documents.</p><p>Eighty percent (80%) of the total or pro rata CIP amount upon Incoterm &ldquo;CIP&rdquo;, upon delivery to the site within forty-five (45) days after receipt of documents.</p><p>Five percent (5%) of the total or pro rata CIP amount upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata CIP amount upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 2.&nbsp; Plant and Equipment Supplied from within the Employer&rsquo;s Country</u></p><p>In respect of plant and equipment supplied from within the Employer&rsquo;s Country, the following payments shall be made:</p><p>Ten percent (10%) of the total EXW amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of the plant and equipment delivered to the site, as evidenced by shipping and delivery documents.</p><p>Eighty percent (80%) of the total or pro rata EXW amount upon Incoterm &ldquo;Ex-Works,&rdquo; upon delivery to the site within forty-five (45) days after receipt of invoice and documents<em>.</em></p><p>Five percent (5%) of the total or pro rata EXW amount upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata EXW amount upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 3.&nbsp; Design Services</u></p><p>In respect of design services for both the foreign currency and the local currency portions, the following payments shall be made:</p><p>Ten percent (10%) of the total design services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp;</p><p>Ninety percent (90%) of the total or pro rata design services amount upon acceptance of design in accordance with GCC Clause 20 by the Project Manager within forty-five (45) days after receipt of invoice.</p><p><u>Schedule No. 4.&nbsp; Installation Services</u></p><p>In respect of installation services for both the foreign and local currency portions, the following payments shall be made:</p><p>Ten percent (10%) of the total installation services amount as an advance payment against receipt of invoice, and an irrevocable advance payment security for the equivalent amount made out in favor of the Employer.&nbsp; The advance payment security may be reduced in proportion to the value of work performed by the Contractor as evidenced by the invoices for installation services.</p><p>Eighty percent (80%) of the measured value of work performed by the Contractor, as identified in the said Program of Performance, during the preceding month, as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s application, will be made monthly within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata value of installation services performed by the Contractor as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s monthly applications, upon issue of the Completion Certificate, within forty-five (45) days after receipt of invoice.</p><p>Five percent (5%) of the total or pro rata value of installation services performed by the Contractor as evidenced by the Employer&rsquo;s authorization of the Contractor&rsquo;s monthly applications, upon issue of the Operational Acceptance Certificate, within forty-five (45) days after receipt of invoice.</p><p>In the event that the Employer fails to make any payment on its respective due date, the Employer shall pay to the Contractor interest on the amount of such delayed payment at the rate of for local currency/CMA (<em>lending Rate at Central Bank of Eswatini plus 1%) &divide;12 and &ldquo;for USD, the (Secured Overnight Financing Rate (SOFR) plus 1%) &divide;12&nbsp; ; for Euro,( EURIBOR plus 1%) &divide;12; </em>per month for period of delay until payment has been made in full.</p><p>&nbsp;</p><p><strong>PAYMENT PROCEDURES</strong></p><p>&nbsp;</p><p><strong>The procedures to be followed in applying for certification and making payments shall be as follows:</strong></p><p>The Contractor should submit invoice outlining the pay items covering the pro rata value of Supply/Work Done along with the submission of the following documents to the Project Manager:</p><ol><li><ol><li><ol><li><strong><u>For Supply: </u></strong></li></ol></li></ol></li><li>Three (3) copies of Contractor&rsquo;s invoice certified by the Employer showing contract no., description of goods, quantity, unit price and total amount.</li><li>Payment Authorization as per the specified format duly signed by the authorized official (s), designated by the Employer to operate the Line of Credit.</li><li>Original and Six (6) copies of negotiable, clean, on-board bill of lading marked freight prepaid / Lorry Receipt and 6 copies of non-negotiable bill of lading / Lorry Receipt.</li><li>Three (3) copies of Detailed Packing list identifying contents of each package.</li><li>Insurance Policy/Certificate.</li><li>Manufacturer&rsquo;s / Supplier&rsquo;s Warranty Certificate.</li><li>Dispatch authorization issued by the employer with the factory inspection report.</li><li>Certificate of origin.<ol><li><ol><li><strong><u>For Design Services and Installation Services:</u></strong></li></ol></li></ol></li></ol><ol><li>All Payments for the works in part or full shall be based upon measurements or otherwise as per the Contract. After excavation before filling the trench/holes, the Contractor shall take and record measurements in presence of the authorized representatives of the Employer.</li><li>The Value of work executed shall be determined by the Employer. The Value of work executed shall comprise the value of the quantities of the items in the Price Bid.</li><li>The Contractor seeking any payment shall submit to the Employer an Invoice with bills with the relevant approved measurement certificates and other requisite documents, duly signed by the site representatives of the Employer. The Employer will then verify the bills and approve for release of payment.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 2.&nbsp; Price Adjustment (Not Applicable)</strong></p><p><strong>The prices are to remain firm and fixed for the duration of the Contract.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 3.&nbsp; Insurance Requirements</strong></p><p><strong>Insurances to be Taken Out by the Contractor</strong></p><p>In accordance with the provisions of GCC Clause 34, the Contractor shall at its expense take out and maintain in effect, or cause to be taken out and maintained in effect, during the performance of the Contract, the insurances set forth below in the sums and with the deductibles and other conditions specified.&nbsp; The identity of the insurers and the form of the policies shall be subject to the approval of the Employer, such approval not to be unreasonably withheld.</p><p>(a)&nbsp;&nbsp;&nbsp; <u>Cargo Insurance</u></p><p>Covering loss or damage occurring, while in transit from the supplier&rsquo;s or manufacturer&rsquo;s works or stores until arrival at the Site, to the Facilities (including spare parts therefor) and to the construction equipment to be provided by the Contractor or its Subcontractors.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>110% of the Contract Price</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Manufacturer&rsquo;s&nbsp;&nbsp; Works</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Site</p></td></tr></tbody></table><p>&nbsp;</p><p>(b)&nbsp;&nbsp;&nbsp; <u>Installation All Risks Insurance</u></p><p>Covering physical loss or damage to the Facilities at the Site, occurring prior to completion of the Facilities, with an extended maintenance coverage for the Contractor&rsquo;s liability in respect of any loss or damage occurring during the defect liability period while the Contractor is on the Site for the purpose of performing its obligations during the defect liability period.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>110% of the Contract Price</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Receipt of site</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>(c)&nbsp;&nbsp;&nbsp; <u>Third Party Liability Insurance</u></p><p>Covering bodily injury or death suffered by third parties (including the Employer&rsquo;s personnel) and loss of or damage to property (including the Employer&rsquo;s property and any parts of the Facilities that have been accepted by the Employer) occurring in connection with the supply and installation of the Facilities.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:124px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:132px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:65px; vertical-align:top; width:94px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 100,000 per person per occasion</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer, Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 10,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Third party personnel</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:124px\"><p>USD 50,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Employer&rsquo;s Property</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:132px\"><p>Commencement of work</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:94px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>(d)&nbsp;&nbsp;&nbsp; <u>Automobile Liability Insurance</u></p><p>Covering use of all vehicles used by the Contractor or its Subcontractors (whether or not owned by them) in connection with the supply and installation of the Facilities.&nbsp; Comprehensive insurance in accordance with statutory requirements.</p><p>&nbsp;</p><p>(e)&nbsp;&nbsp;&nbsp; <u>Workers&rsquo; Compensation</u></p><p>In accordance with the statutory requirements applicable in any country where the Facilities or any part thereof is executed.</p><p>&nbsp;</p><p>(f)&nbsp;&nbsp;&nbsp;&nbsp; <u>Employer&rsquo;s Liability</u></p><p>In accordance with the statutory requirements applicable in any country where the Facilities or any part thereof is executed.</p><p>&nbsp;</p><p>(g)&nbsp;&nbsp;&nbsp; <u>Other Insurances</u></p><p>The Contractor is also required to take out and maintain at its own cost the following insurances:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:127px\"><p><strong>Amount</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:98px\"><p><strong>Deductible limits</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:115px\"><p><strong>Parties Insured</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:128px\"><p><strong>From</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:95px\"><p><strong>To</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:127px\"><p>To be indicated by the Contractor</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:98px\"><p>NIL</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:115px\"><p>Contractor, and Subcontractor&nbsp; (if any)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:128px\"><p>Receipt of site</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:71px; vertical-align:top; width:95px\"><p>Up to Defect Liability Period</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>The Employer shall be named as co-insured under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Third Party Liability, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances, and the Contractor&rsquo;s Subcontractors shall be named as co-insureds under all insurance policies taken out by the Contractor pursuant to GCC Sub-Clause 34.1, except for the Cargo, Workers&rsquo; Compensation and Employer&rsquo;s Liability Insurances.&nbsp; All insurer&rsquo;s rights of subrogation against such co-insureds for losses or claims arising out of the performance of the Contract shall be waived under such policies.</p><p>&nbsp;</p><p><strong>Insurances To Be Taken Out By The Employer</strong></p><p>&nbsp;</p><p>The Employer shall at its expense take out and maintain in effect during the performance of the Contract the following insurances.</p><p>&nbsp;</p><p><u>Details</u>:</p><p><strong>NIL</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 4.&nbsp; Time Schedule</strong></p><p><strong>4.1 Description of Facilities: </strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:302px\"><p><strong>Name of Facilities</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Completion Time required by the Employer from the Effective Date</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:146px\"><p><strong>Completion date guaranteed by the Bidder from the effective date</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:302px\"><p><strong>Design, Supply and installation of 11kV auto-reclosers</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:151px\"><p>&nbsp;</p><p><strong>Six (6) Months</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; vertical-align:top; width:146px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>4.2 The activities under the Contractor&rsquo;s program for Project Completion shall be in the form of a master network (MNW) and shall identify the various activities like design, engineering, manufacturing, supply, installation, factory testing, transportation to site, site testing and commissioning, trial operation and taking over etc. of the facilities or specific part thereof (where specific parts are specified in PCC). The network shall conform to the above Project Completion Schedule. This master network will be discussed and agreed before Kick-off meeting in line with the above. The detailed network(s) and project implementation plans &amp; programs shall preferably be prepared in Primavera or in MS Project or in the latest Project Management tool as convenient to the Employer and shall form part of the contract.</strong></p><p><strong>4.3</strong> The Employer reserves the right to request minor changes in the work schedule at the time of Award of Contract to the successful Bidder.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 5.&nbsp; List of Major Items of Plant and Installation Services and List of Approved Subcontractors</strong></p><p>A list of major items<u> of Plant and Installation Services is provided below.</u></p><p>&nbsp;</p><p>The following Subcontractors and/or manufacturers are approved for carrying out the items of the Facilities indicated below.&nbsp; Where more than one Subcontractor is listed, the Contractor is free to choose between them, but it must notify the Employer of its choice in good time prior to appointing any selected Subcontractor.&nbsp; In accordance with GCC Sub-Clause 19.1, the Contractor is free to submit proposals for Subcontractors for additional items from time to time.&nbsp; No Subcontracts shall be placed with any such Subcontractors for additional items until the Subcontractors have been approved in writing by the Employer and their names have been added to this list of Approved Subcontractors.</p><p>&nbsp;</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:205px\"><p><strong>Major Items of Plant and Installation Services</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:294px\"><p><strong>Approved Subcontractors/Manufacturers</strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:115px\"><p><strong>Nationality</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:205px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:294px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:115px\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 6.&nbsp; Scope of Works and Supply by the Employer</strong></p><p>The following personnel, facilities, works and supplies will be provided/supplied by the Employer, and the provisions of GCC Clauses 10, 21 and 24 shall apply as appropriate. All personnel, facilities, works and supplies will be provided by the Employer in good time so as not to delay the performance of the Contractor, in accordance with the approved Time Schedule and Program of Performance pursuant to GCC Sub-Clause 18.2.</p><p>Unless otherwise indicated, all personnel, facilities, works and supplies will be provided free of charge to the Contractor.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:300px\"><p><strong><u>Personnel</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>Operational staff for witnessing works, arranging outages and supervision during network outages.</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Facilities</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p>None</p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Works</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>Dismantling of existing 11 kV infrastructure at all 13 sites</li><li>Dismantling of existing 11 kV infrastructure at all 13 sites&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li></ul></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><u>None</u></p></td></tr><tr><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Supplies</u></strong></p></td><td style=\"background-color:#92d050; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><strong><u>Charge to Contractor (if any)</u></strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><ul><li>4 D10/11 poles per site and corresponding steel cross arms</li><li>13 x 16KVA 11/0.23kV transformers and corresponding MV surge arrestors, LV MCB in pole mounted box</li><li>Supply of Camo earthing conductor, clamps, spikes, lugs and conductive cement for all 13 sites</li></ul><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:300px\"><p><u>None</u></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 7.&nbsp; List of Documents for Approval or Review</strong></p><p>&nbsp;</p><p>Pursuant to GCC Sub-Clause 20.3.1, the Contractor shall prepare, or cause its Subcontractor to prepare, and present to the Project Manager in accordance with the requirements of GCC Sub-Clause 18.2 (Program of Performance), the following documents for</p><p>&nbsp;</p><p>A.&nbsp;&nbsp;&nbsp;&nbsp; <u>Approval</u></p><ul><li>Project schedule/Baseline</li><li>Occupational Health and Safety plan/ file</li><li>Insurance and securities</li><li>Organization chart</li><li>Key personnel CV</li><li>Activity method statements</li><li>Design report (design basis, calculations, drawings)</li><li>Equipment data sheets</li><li>Equipment drawings</li><li>Recovery Plan</li><li>Quality assurance documents</li><li>Equipment inspection, SAT and FAT Repots</li><li>Signal list</li><li>Inspection &amp; Test Plan</li><li>Commissioning procedure and plan</li><li>Test results</li><li>Commissioning reports</li><li>Approved manufacturer list</li><li>Training manual</li><li>As built drawings and</li><li>Final Completion report</li></ul><p>&nbsp;</p><p>B.&nbsp;&nbsp;&nbsp;&nbsp; <u>Review</u></p><ul><li>Risk register</li><li>Work permits</li><li>Resource mobilization plan</li><li>Communication matrix</li><li>O &amp; M manuals</li><li>Monthly progress reports</li><li>Weekly site report</li><li>Daily site report</li><li>Final handover documents</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Appendix 8.&nbsp; Functional Guarantees</strong></p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>General</u></p><p>This Appendix sets out</p><p>(a)&nbsp;&nbsp;&nbsp; the functional guarantees referred to in GCC Clause 28 (Functional Guarantees)</p><p>(b)&nbsp;&nbsp;&nbsp; the preconditions to the validity of the functional guarantees, either in production and/or consumption, set forth below</p><p>(c)&nbsp;&nbsp;&nbsp; the minimum level of the functional guarantees</p><p>(d)&nbsp;&nbsp;&nbsp; the formula for calculation of liquidated damages for failure to attain the functional guarantees.</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Preconditions</u></p><p>The Contractor gives the functional guarantees (specified herein) for the facilities, subject to the following preconditions being fully satisfied:</p><p><em>____________________________________________________________________________________</em></p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Functional Guarantees</u></p><p>Subject to compliance with the foregoing preconditions, the Contractor guarantees as follows:</p><p>3.1&nbsp;&nbsp;&nbsp; Production Capacity</p><p><em>_____________________________________________________________________________</em></p><p><strong>and/or</strong></p><p>3.2&nbsp;&nbsp;&nbsp; Raw Materials and Utilities Consumption</p><p><em>____________________________________________________________________________</em></p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Failure in Guarantees and Liquidated Damages</u></p><p>4.1&nbsp;&nbsp;&nbsp; Failure to Attain Guaranteed Production Capacity</p><p>If the production capacity of the facilities attained in the guarantee test, pursuant to GCC Sub-Clause 25.2, is less than the guaranteed figure specified in para. 3.1 above, but the actual production capacity attained in the guarantee test is not less than the minimum level specified in para. 4.3 below, and the Contractor elects to pay liquidated damages to the Employer in lieu of making changes, modifications and/or additions to the Facilities, pursuant to GCC Sub-Clause 28.3, then the Contractor shall pay liquidated damages at the rate of <em>___________________</em> for every complete one percent (1%) of the deficiency in the production capacity of the Facilities, or at a proportionately reduced rate for any deficiency, or part thereof, of less than a complete one percent (1%).</p><p>4.2&nbsp;&nbsp;&nbsp; Raw Materials and Utilities Consumption in Excess of Guaranteed Level</p><p><em>__________________________________________________________________</em></p><p>If the actual measured figure of specified raw materials and utilities consumed per unit (or their average total cost of consumption) exceeds the guaranteed figure specified in para. 3.2 above (or their specified average total cost of consumption), but the actual consumption attained in the guarantee test, pursuant to GCC Sub-Clause 25.2, is not more than the maximum level specified in para. 4.3 below, and the Contractor elects to pay liquidated damages to the Employer in lieu of making changes, modifications and/or additions to the Facilities pursuant to GCC Sub-Clause 28.3, then the Contractor shall pay liquidated damages at the rate of <em>[amount in the contract currency]</em> for every complete one percent (1%) of the excess consumption of the Facilities, or part thereof, of less than a complete one percent (1%).</p><p>4.3&nbsp;&nbsp;&nbsp; Minimum Levels</p><p>Notwithstanding the provisions of this paragraph, if as a result of the guarantee test(s), the following minimum levels of performance guarantees (and consumption guarantees) are not attained by the Contractor, the Contractor shall at its own cost make good any deficiencies until the Facilities reach any of such minimum performance levels, pursuant to GCC Sub-Clause 28.2:</p><p>(a)&nbsp;&nbsp;&nbsp; production capacity of the Facilities attained in the guarantee test:&nbsp; ninety-five percent (95%) of the guaranteed production capacity (the values offered by the Contractor in its Bid for functional guarantees represents 100%).</p><p><strong>and/or</strong></p><p>(b)&nbsp;&nbsp;&nbsp; average total cost of consumption of all the raw materials and utilities of the Facilities:&nbsp; one hundred and five percent (105%) of the guaranteed figures (the figures offered by the Contractor in its Bid for functional guarantees represents 100%).</p><p>4.4&nbsp;&nbsp;&nbsp; Limitation of Liability</p><p>Subject to para. 4.3 above, the Contractor&rsquo;s aggregate liability to pay liquidated damages for failure to attain the functional guarantees shall not exceed ______ percent ( ___ %) of the Contract price.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Performance Security Form&ndash; Bank Guarantee[18]</strong></p><p><em>[Guarantor letterhead or SWIFT identifier code]</em></p><p><strong>Beneficiary:</strong>&nbsp;&nbsp; <em>[insert name and Address of </em>Employer<em>]</em></p><p>&nbsp;</p><p><strong>Date:</strong>&nbsp;&nbsp; _<em> [Insert date of issue]</em></p><p><strong>PERFORMANCE GUARANTEE No.: ____</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor:&nbsp; </strong><em>[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p>We have been informed that <em>____________________</em> (hereinafter called &ldquo;the Applicant&rdquo;) has entered into Contract No. <em>________________</em>dated ____________ with the Beneficiary, for the execution of <em>____________________________</em> (hereinafter called &ldquo;the Contract&rdquo;).</p><p>&nbsp;</p><p>Furthermore, we understand that, according to the conditions of the Contract, a performance guarantee is required.</p><p>At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of <em>_________________</em>(<u>___</u>)<em><strong>[19]</strong></em>,such sum being payable in the types and proportions of currencies in which the Contract Price is payable, upon receipt by us of the Beneficiary&rsquo;s complying demand supported by the Beneficiary&rsquo;s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without the Beneficiary needing to prove or to show grounds for your demand or the sum specified therein.</p><p>This guarantee shall be reduced by half upon our receipt of:</p><p>&nbsp;</p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a copy of the Operational Acceptance Certificate; or</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant (i) attaching a copy of its notice requesting issuance of the Operational Acceptance Certificate and (ii) stating that the Project Manager has failed to issue such Certificate within the time required or provide in writing justifiable reasons why such Certificate has not been issued, so that Operational Acceptance is deemed to have occurred.</p><p>&nbsp;</p><p>This guarantee shall expire no later than the earlier of:<em><strong>[20]</strong></em></p><p>(a) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; twelve months after our receipt of either (a) or (b) above; or</p><p>(b) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; eighteen months after our receipt of:</p><p>(i) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a copy of the Completion Certificate; or</p><p>(ii) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant, attaching a copy of the notice to the Project Manager that the Facilities are ready for commissioning, and stating that fourteen days have elapsed from receipt of such notice (or seven days have elapsed if the notice was a repeated notice) and the Project Manager has failed to issue a Completion Certificate or inform the Applicant in writing of any defects or deficiencies; or</p><p>(iii) &nbsp;&nbsp;&nbsp;&nbsp; a registered letter from the Applicant stating that no Completion Certificate has been issued but the Employer is making use of the Facilities; or</p><p>&nbsp;</p><p>(c) &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; the ____ day of _____, 2___.[21]</p><p>&nbsp;</p><p>Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby excluded.</p><p>_____________________<br /><em>[signature(s)]</em></p><p><br />&nbsp;</p><p><strong><em>Note:&nbsp; All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p><strong>Performance Security Form- Conditional Bank Guarantee</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Date:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Loan/Credit No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RFB No:&nbsp;&nbsp; <u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>To: ___________________________________</p><p>&nbsp;</p><p>Dear Ladies and/or Gentlemen,</p><p>We refer to the Contract Agreement (&ldquo;the Contract&rdquo;) signed on [date] between you and ____________________________ (&ldquo;the Contractor&rdquo;) concerning design, execution and completion of ____________________________.</p><p>By this letter we, the undersigned, [name of Bank], a Bank (or company) organized under the laws of _________________ and having its registered/principal office at _________________, do hereby jointly and severally with the Contractor irrevocably guarantee payment owed to you by the Contractor, pursuant to the Contract, up to the sum of ___________, equivalent to _______________ percent (%)&nbsp; of the Contract Price until the date of the Operational Acceptance Certificate and thereafter up to a sum of ____________, equivalent to__________ percent (%)&nbsp; of the Contract Price, until twelve (12) months after the date of Operational Acceptance, or eighteen (18) months after Completion of the Facilities, whichever comes first.</p><p>Where it is agreed between you and the Contractor that the Facilities are to be accepted in parts, and thus where there are separate Completion and Operational Acceptance Certificates for each part, this Letter of Guarantee shall be apportioned to the value of each such part and shall reduce or expire as provided above on or following Completion or Operational Acceptance of each part.</p><p>We shall only undertake to make payment under this Letter of Guarantee upon our receipt of a written demand signed by your duly authorized officer for a specified sum, where such demand sets out the reasons for your claim under this Letter of Guarantee and is accompanied by</p><p>(a)&nbsp;&nbsp;&nbsp; a copy of the written notice sent by you to the Contractor before making the claim under this Guarantee, specifying the Contractor&rsquo;s breach of contract and requesting the Contractor to remedy it</p><p>(b)&nbsp;&nbsp;&nbsp; a letter signed by your duly authorized officer certifying that the Contractor has failed to remedy the default within the period allowed for remedial action</p><p>(c)&nbsp;&nbsp;&nbsp; a copy of your written notice to the Contractor stating your intent to claim under this Letter of Guarantee because of the Contractor&rsquo;s failure to remedy the default in accordance with the request referred to in para. (a) above.</p><p>Our liability under this Letter of Guarantee shall be to pay to you whichever is the lesser of the sum so requested or the amount then guaranteed hereunder in respect of any demand duly made hereunder prior to expiry of this Letter of Guarantee, without being entitled to inquire whether or not this payment is lawfully demanded.</p><p>This Letter of Guarantee shall be valid from the date of issue until the earlier of twelve (12) months after the date of Operational Acceptance or eighteen (18) months after the date of Completion of the Facilities or, where the Facilities are to be accepted in parts, twelve (12) months after the date of Operational Acceptance or eighteen (18) months after the date of Completion of the last part or [date], whichever comes first.</p><p>Except for the documents herein specified, no other documents or other action shall be required, notwithstanding any applicable law or regulation.</p><p>If the Defect Liability Period is extended with respect to any part of the Facilities in accordance with the Contract, you shall notify us, and the validity of this Letter of Guarantee shall be extended with respect to the percentage of the Contract Price stipulated in the notification until expiry of such extended Defect Liability Period.</p><p>Our liability under this Letter of Guarantee shall become null and void immediately upon its expiry, whether it is returned or not, and no claim may be made hereunder after such expiry or after the aggregate of the sums paid by us to you shall equal the sums guaranteed hereunder, whichever is the earlier.</p><p>All notices to be given hereunder shall be given by registered (airmail) post to the addressee at the address herein set out or as otherwise advised by and between the parties hereto.</p><p>We hereby agree that any part of the Contract may be amended, renewed, extended, modified, compromised, released or discharged by mutual agreement between you and the Contractor, and this security may be exchanged or surrendered without in any way impairing or affecting our liabilities hereunder without notice to us and without the necessity for any additional endorsement, consent or guarantee by us, provided, however, that the sum guaranteed shall not be increased or decreased.</p><p>No action, event or condition which by any applicable law should operate to discharge us from liability hereunder shall have any effect and we hereby waive any right we may have to apply such law, so that in all respects our liability hereunder shall be irrevocable and, except as stated herein, unconditional in all respects.</p><p>Yours truly,</p><p>&nbsp;</p><p><u>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></p><p>Authorized Signature</p><p>&nbsp;</p><p><strong>Advance Payment Security</strong></p><p><strong>Demand Guarantee</strong></p><p><em>[Guarantor letterhead or SWIFT identifier code] </em></p><p>&nbsp;</p><p><strong>Beneficiary: </strong><strong><em>........................................................ </em></strong><strong><em>Name and Address of Employer</em></strong><strong><em> ..................................................... </em></strong></p><p><strong>Date:</strong><em>[Insert date of issue]</em><strong><em>..................................................................................................................................................... </em></strong></p><p><strong>Advance Payment Guarantee No.:</strong><em>[Insert guarantee reference number]</em></p><p><strong>Guarantor: </strong><em>&nbsp;[Insert name and address of place of issue, unless indicated in the letterhead]</em></p><p><strong><em>............................................................................................................................................................................................................................ </em></strong></p><p>We have been informed that . . . . .. . . . .&nbsp; (hereinafter called &ldquo;the Applicant&rdquo;) has entered into Contract No. . . . . .<em>. . . . . </em>dated . . . . . . ..with the Beneficiary, for the execution of, . . . . . .<em>. </em>. . . .&nbsp; (hereinafter called &ldquo;the Contract&rdquo;).</p><p>Furthermore, we understand that, according to the Conditions of the Contract, an advance payment in the sum&nbsp; . . . . .<em>. . . . . . </em>(. . . . .<em>. . . . </em>.&nbsp; ) is to be made against an advance payment guarantee.</p><p>At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of .<br />(. . . . .<em>. . . . . </em>&nbsp;) [22] upon receipt by us of the Beneficiary&rsquo;s complying demand supported by the Beneficiary&rsquo;s statement whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating either that the applicant:</p><ol><li><ol><li><ol><li><strong>has used the advance payment for purposes other than the costs of mobilization in respect of the Facilities; or</strong></li><li><strong>&nbsp;has failed to repay the advance payment in accordance with the Contract conditions, specifying the amount which the Applicant has failed to repay. </strong></li></ol></li></ol></li></ol><p>A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Beneficiary&rsquo;s bank stating that the advance payment referred to above has been credited to the Applicant on its account number ___________ at _________________..</p><p>&nbsp;</p><p>The maximum amount of this guarantee shall be progressively reduced by the amount of the advance payment repaid by the Applicant as indicated in copies of interim statements or payment certificates which shall be presented to us.&nbsp; This guarantee shall expire, at the latest, upon our receipt of documentation indicating full repayment by the Applicant of the amount of the advance payment, or on the . . . day of . . . . . . . , . . . . .[23], whichever is earlier.&nbsp; Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.</p><p>This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby excluded.</p><p>&nbsp;</p><p>____________________ <em>[signature(s)]</em></p><p><br /><strong><em>Note:&nbsp; All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.</em></strong></p><p>&nbsp;</p><p>&nbsp;</p><p>[1]&nbsp;&nbsp; Nonperformance, as decided by the Employer, shall include all contracts where (a) nonperformance was not challenged by the contractor, including through referral to the dispute resolution mechanism under the respective contract, and (b) contracts that were so challenged but fully settled against the contractor. Nonperformance shall not include contracts where Employers decision was overruled by the dispute resolution mechanism. Nonperformance must be based on all information on fully settled disputes or litigation, i.e., dispute or litigation that has been resolved in accordance with the dispute resolution mechanism under the respective contract and where all appeal instances available to the Bidder have been exhausted.</p><p>[2] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; This requirement also applies to contracts executed by the Bidder as JV member.</p><p>[3]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Bidder shall provide accurate information on the related Letter of Bid about any litigation or arbitration resulting from contracts completed or ongoing under its execution over the last five years. A consistent history of awards against the Bidder or any member of a joint venture may result in failure of the Bid.</p><p>[4] The Employer may use this information to seek further information or clarifications in carrying out its due diligence.&nbsp;</p><p>[5] &nbsp;&nbsp; For contracts under which the Bidder participated as a joint venture member or sub-contractor, only the Bidder&rsquo;s share, by value, shall be considered to meet this requirement</p><p>[6] &nbsp;&nbsp;&nbsp;&nbsp; Substantial completion shall be based on 80% or more Plant and installation completed under the contract.</p><p>[7] &nbsp;&nbsp;&nbsp;&nbsp; In the case of JV, the value of contracts completed by its members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been met. Instead, each contract performed by each member shall satisfy the minimum value of a single contract as required for single entity. In determining whether the JV meets the requirement of total number of contracts, only the number of contracts completed by all members each of value equal or more than the minimum value required shall be aggregated.</p><p>[8] In the case of JV, the value of contracts completed by its members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been met. Instead, each contract performed by each member shall satisfy the minimum value of a single contract as required for single entity. In determining whether the JV meets the requirement of total number of contracts, only the number of contracts completed by all members each of value equal or more than the minimum value required shall be aggregated.</p><p>[9] &nbsp;&nbsp;&nbsp;&nbsp; For the avoidance of doubt, a sanctioned party&rsquo;s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.</p><p>[10] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.&nbsp;</p><p>[11] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inspections in this context usually are investigative (i.e., forensic) in nature.&nbsp; They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms.&nbsp; Such activity includes but is not limited to: accessing and examining a firm&#39;s or individual&#39;s financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.</p><p>&nbsp;</p><p>&nbsp;</p><p>[13] Costs shall be in the currencies of the Contract.</p><p>[14] Costs shall be in the currencies of the Contract.</p><p>2 Specify where necessary.</p><p>[15] &nbsp;&nbsp;&nbsp;&nbsp; For the avoidance of doubt, a sanctioned party&rsquo;s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.</p><p>[16] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.&nbsp;</p><p>[17] &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inspections in this context usually are investigative (i.e., forensic) in nature.&nbsp; They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms.&nbsp; Such activity includes but is not limited to: accessing and examining a firm&#39;s or individual&#39;s financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.</p><p>[18]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <em>The Employer should insert either the Bank Guarantee or the Conditional Guarantee.</em></p><p>[19]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Guarantor shall insert an amount representing the percentage of the Contract Price specified in the Contract and denominated either in the currency(ies) of the Contract or a freely convertible currency acceptable to the <em>Employer</em>.</p><p>[20]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; This text shall be revised as and where necessary to take into account (i) partial acceptance of the Facilities in accordance with Sub-Clause 25.4 of the GCC; and (ii) extension of the Performance Security when the Contractor is liable for an extended warranty obligation pursuant to Sub-Clause 27.10 of the GCC (although in this latter case the <em>Employer</em> might want to consider an extended warranty security in lieu of the extension of the Performance Security).</p><p>[21]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Insert the date twenty-eight days after the expected expiration date of the Defect Liability Period. The Employer should note that in the event of an extension of the time for completion of the Contract, the Employer would need to request an extension of this guarantee from the Guarantor. Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Employer might consider adding the following text to the form, at the end of the penultimate paragraph: &ldquo;The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six months][one year], in response to the Employer&rsquo;s written request for such extension, such request to be presented to the Guarantor before the expiry of the guarantee.&rdquo;</p><p>&nbsp;</p><p>[22]<em>The Guarantor shall insert an amount representing the amount of the advance payment and denominated either in the currency(ies) of the advance payment as specified in the Contract, or in a freely convertible currency acceptable to the Employer.</em></p><p>[23]<em>Insert the expected expiration date of the Time for Completion.&nbsp; The Employer should note that in the event of an extension of the time for completion of the Contract, the Employer would need to request an extension of this guarantee from the Guarantor.&nbsp; Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Employer might consider adding the following text to the form, at the end of the penultimate paragraph:&nbsp; &ldquo;The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six months][one year], in response to the Beneficiary&rsquo;s</em><em> written request for such extension, such request to be presented to the Guarantor before the expiry of the guarantee.&rdquo;</em></p>"},{"id":"OP00463159","notice_type":"Request for Expression of Interest","noticedate":"18-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-03T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Albania","project_id":"P178715","project_name":"Climate Resilience and Agriculture Development Project","bid_reference_no":"AL-MARD-560551-CS-INDV","bid_description":"M&E Consultant of PMT","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Bulevardi Dëshmorët e Kombit Nr.2; Tiranë, Albania\nTel (off.): +355 4 2226243 - 75191","contact_ctry_name":"Albania","contact_email":"Arben.Molla@bujqesia.gov.al","contact_name":"Arben  Molla","contact_organization":"Ministry of Agriculture and Rural Development","contact_phone_no":"+355 69","contact_web_url":"www.bujqesia.gov.al","submission_date":"2026-08-18T00:00:00Z","notice_text":"<p>&nbsp;</p><p><strong>ALBANIA</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p><p><strong>(CONSULTING SERVICES)</strong></p><p><strong>Selection of Individual Consultant </strong></p><p><strong>Climate Resilience and Agriculture Development Project in Albania</strong></p><p><strong>Project ID Number:&nbsp; No.: P178715</strong></p><p><strong>IBRD Loan Number: </strong><strong>94890 </strong></p><p><strong>Assignment Title: &ldquo;M&amp;E Consultant of PMT&rdquo; &nbsp;</strong></p><p><strong>(Ref. No. AL-MARD-560551-CS-INDV)&rdquo;</strong></p><p><strong>The World Bank is assisting the Government of Albania (GoA) with the financing of the Climate Resilience and Agriculture Development project (CRAD). This project aims to increase competitiveness and climate resilience of priority agri-food value chains. The expected outputs from the project are: (i) increased supply/sales to local agri-food businesses, (ii) increased agricultural productivity and production, lower costs and extended production season (iii) improved traceability, farmer&rsquo;s market integration and the compliance with food safety and quality requirements, (iv) evidence-based decision making for resilience and sustainable agri-food systems. </strong></p><p><strong>The Project consists of the following components, which will support the project objective:</strong></p><ol><li><strong>Promoting Climate Smart Agriculture and Access to Markets</strong></li><li><strong>Enhancing Compliance with Food Safety and Quality Standards</strong></li><li><strong>Strengthening Evidence-based Analysis Capacity of MARD and Municipalities</strong></li></ol><p><strong>The services required to be contracted aim to support the Ministry of Agriculture and Rural Development (MARD) in ensuring successful implementation of the contract &ldquo;M&amp;E Consultant of PMT&rdquo;.</strong></p><p><strong>The Ministry of Agriculture and Rural Development (MARD) is the lead implementation agency for this Project (CRAD) and publishes this Request for Expression of Interest with the aim of selecting an individual consultant as M&amp;E Consultant of PMT who will be part (a team member) of the PMT and he/she will support the PMT in monitring and evalution issue compliance in the implementation of Project activities.</strong></p><p><strong>Objective of the Consultancy and Scope of Work</strong></p><p><strong>The primary objective of the Monitoring and Evaluation (M&amp;E) Specialist consultancy is to support the effective implementation of the Climate Resilience and Agriculture Development Project by establishing and operationalizing robust monitoring and evaluation systems. The M&amp;E Specialist will ensure that project activities across all components are tracked, analyzed, and reported in alignment with the project&rsquo;s development objectives of increasing competitiveness and climate resilience of priority agri-food value chains. The role will contribute to evidence-based decision-making, facilitate adaptive management, and strengthen institutional capacity at the Ministry of Agriculture and Rural Development (MARD) and municipal levels, with a particular focus on stakeholder engagement and local context.</strong></p><p><strong>Key activities and responsibilities include:</strong></p><ol><li><strong>Develop and implement a comprehensive M&amp;E framework for the project, including clear indicators, data collection methodologies, and reporting protocols, in accordance with the project results framework and World Bank guidelines.</strong></li><li><strong>Coordinate and oversee the collection, validation, and analysis of quantitative and qualitative data related to project outputs, outcomes, and impacts across all components, including productivity improvements, irrigation and drainage upgrades, compliance with food safety standards, and institutional strengthening.</strong></li><li><strong>Support the MARD and municipalities in building capacity for consistent and comprehensive data collection, management, and analysis, ensuring integration of gender-disaggregated and beneficiary feedback indicators.</strong></li><li><strong>Facilitate participatory monitoring processes, including the establishment and engagement of local monitoring groups composed of farmers, agri-food businesses, and other stakeholders, to enhance transparency and accountability in project implementation.</strong></li><li><strong>Prepare periodic progress reports, evaluation summaries, and presentations for project management, government counterparts, and the World Bank, highlighting achievements, challenges, and recommendations for adaptive management.</strong></li><li><strong>Contribute to the preparation and review of project documentation required for compliance with environmental and social safeguards, including monitoring of citizen engagement activities and grievance redress mechanisms.</strong></li><li><strong>Provide technical support for scaling up digital tools such as the Irrigation and Drainage Management Information System (IDMIS) and GIS mapping, and ensure their effective use in monitoring project activities at municipal and central levels.</strong></li><li><strong>Liaise with local stakeholders, including beneficiaries, community representatives, and implementing agencies, to ensure timely and accurate information flow and promote inclusive participation in M&amp;E activities.</strong></li></ol><p><strong>This list of duties and responsibilities is not exhaustive, and the consultant may be required to perform other related tasks as assigned by the designated supervisor.</strong></p><p><strong>Required Experience and Qualifications</strong></p><p><strong>The Consultant shall possess the following qualifications and experience:</strong></p><ul><li><strong>At least a university degree, preferably a Master&#39;s degree, in Economics, Business Administration, Statistics, Public Administration, Agricultural and Rural Development, Social Sciences, or another relevant discipline.</strong></li><li><strong>A minimum of fifteen (15) years of overall professional experience.</strong></li><li><strong>At least seven (7) years of demonstrated experience in the design, implementation, monitoring, and evaluation of development projects and program in the field of agriculture, food safety and irrigation. </strong></li><li><strong>At least ten (10) years of professional experience working on projects financed by international development organizations, preferably in the agriculture and rural development sector.</strong></li><li><strong>Previous experience with World Bank-financed projects will be considered a strong advantage.</strong></li><li><strong>Demonstrated knowledge of results-based monitoring and evaluation methodologies and data analysis techniques.</strong></li><li><strong>Excellent analytical, report writing, and presentation skills.</strong></li><li><strong>Excellent command of written and spoken Albanian and English.</strong></li><li><strong>Strong interpersonal, communication, and teamwork skills.</strong></li></ul><p><strong>Applicants that fulfill the minimum qualification requirements will be further evaluated based on the below <u>evaluation grid for the position:</u></strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#bfbfbf; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:414px\"><p><strong>Evaluated expertise</strong></p></td><td style=\"background-color:#bfbfbf; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:154px\"><p><strong>Points</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>General Experience</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>30</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Adequacy for the assignment </strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>60</strong></p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Language and computer skills</strong></p></td><td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>10</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:414px\"><p><strong>Total</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:154px\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong>The consultant will be selected based on Selection of Individual Consultant (IC) in accordance with the procedures set out in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Procurement in Investment Project Financing Goods, Works, Non-Consulting and Consulting Services July 2016 (revised November 2020).</strong></p><p><strong>The initial duration of the assignment is 12 months, with a probation period of 3 months, from contract signing and/or entry into force of the contract, with the option of renewal for the entire Project implementation period (38 months), based on satisfactory performance.&nbsp; The type of contract for this assignment is Time Based Contract.&nbsp; The Consultant M&amp;E expert shall be engaged on a full-time basis.</strong></p><p><strong>Interested local Consultants may obtain further information concerning the Terms of Reference at the official website of MARD:<em> </em>https://bujqesia.gov.al/projekti-qendrueshmeria-ndaj-klimes-dhe-zhvillimit-ne-bujqesi/<u>, </u>or at the address below, during office hours 08:00 to 16:30 (Monday to Thursday) and 08:00 to 14:00 on Friday.</strong></p><p><strong>The Ministry of Agriculture and Rural Development (MARD) invites interested individuals to indicate their interest in providing the services. Interested candidates should provide: (i) motivation letter, underlining their advantages concerning this position, (ii)&nbsp;&nbsp; Curriculum Vitae, as well as, (iii) information that indicates that the candidates have required qualifications to carry out the Consulting Services, and (iv) various references. </strong></p><p><strong>All documents should be submitted in English language.</strong></p><p><strong>Expressions of Interest (EoIs) must be delivered no later than <u>September 03, 2026</u> hardcopy (in person or by mail) to the address below, within office hours, and/or electronically at the below e-mail address. </strong></p><p>&nbsp;</p><p><strong>Ministry of Agriculture and Rural Development </strong></p><p><strong>Adr: Blv. &quot;D&euml;shmor&euml;t e Kombit&quot;, Nr. 2, 1001, Tirana, Albania</strong></p><p><strong>E-mail: arben.molla@bujqesia.gov.al </strong></p><p>&nbsp;</p><p><strong>Attn:&nbsp;&nbsp; Mr. Arben Molla</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Manager of PMT</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00461885","notice_type":"Request for Expression of Interest","noticedate":"17-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-31T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Armenia","project_id":"P504282","project_name":"Armenia Tourism and Regional Infrastructure Project","bid_reference_no":"TRIP-CS-01","bid_description":"Consultancy Service for PROJECT PERFORMANCE MONITORING & EVALUATION","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Ulnetsi 31, Yerevan","contact_ctry_name":"Armenia","contact_email":"s.grigoryan@atdf.am","contact_name":"Silva Grigoryan","contact_organization":"Armenian Territorial Development Fund","contact_phone_no":"(060) 50-15-60 +140","contact_web_url":"www.atdf.am","submission_date":"2026-08-17T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p>Republic of Armenia</p><p>Tourism and Regional Infrastructure Project (TRIP)</p><p>Loan No: <strong>IBRD-98090</strong></p><p><strong>Assignment Title: </strong><strong>Consultancy Service for project performance Monitoring &amp; Evaluation</strong></p><p><strong>Reference No</strong>. (as per Procurement Plan):<strong> </strong><strong>TRIP-CS-01</strong></p><p><strong>17</strong><strong>&nbsp;</strong><strong>August, 2026</strong></p><p>The Republic of Armenia has received financing from the World Bank toward the cost of the Tourism and Regional Infrastructure Project (TRIP), and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include supporting ATDF in establishing and implementing a practical and reliable Monitoring and Evaluation (M&amp;E) system for the Project, enabling systematic tracking of project implementation progress, measurement of results and outcomes, and timely reporting against the Project Results Framework.</p><p>Specifically, the Consultant will:</p><ul><li>Operationalize the existing Results Framework (presented in Annex 1);</li><li>Update and validate baseline data where needed;</li><li>Develop and implement a fit-for-purpose M&amp;E methodology;</li><li>Conduct data collection, analysis, and reporting;</li></ul><p>The anticipated date of contract signing is May 2027. The expected completion date of the assignment August, 2030.</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>&nbsp;</p><p>The Armenian Territorial Development Fund (ATDF) now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>The shortlisting criteria are:</strong></p><p><em>(Experience during the last five (5) years)</em></p><ul><li>Experience in the development, implementation and/or operation of Monitoring and Evaluation (M&amp;E) systems.</li><li>Experience in planning and conducting baseline and status quo assessments, socio-economic and/or tourism sector studies, including data collection, analysis, and preparation of analytical reports.</li><li>Experience in designing and implementing quantitative and qualitative research, including survey design, sampling methodologies, and data analysis.</li><li>Experience in conducting similar studies in the regions (marzes) of the Republic of Armenia.</li><li>Experience in developing and/or implementing digital monitoring platforms (M&amp;E databases/dashboards) or digital results management tools under at least one (1) project.</li></ul><p>* The Consultant shall provide information on contracts completed by the firm, including the name of the Client, contract value, and a brief description of the services provided.</p><p>&nbsp;Key Experts will not be evaluated at the shortlisting stage.</p><p>The shortlist will contain five (5) to eight (8) firms.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the <strong>Quality and Cost-Based Selection</strong> <strong>(QCBS)</strong> method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours from <strong>09:00 to 17:00 (Yerevan time).</strong></p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by e-mail) by <strong>August 31, 2026.</strong></p><p>Armenian Territorial Development Fund</p><p>Procurement department</p><p>K. Ulnetsi st. 31bld</p><p>Yerevan 0037, Armenia</p><p>Tel: (+374 60) 50-15-60 +140</p><p>E-mail: <strong>procurementatdf2026@gmail.com</strong><strong><u>, </u></strong><strong><u>m</u></strong><strong><u>.grigoryan@atdf.am</u></strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Tourism and Regional Infrastructure Project</strong></p><p><strong>Consultancy Service for</strong></p><p><strong>PROJECT PERFORMANCE MONITORING &amp; EVALUATION</strong></p><p><strong>TRIP-CS-01</strong></p><p>The Tourism and Regional Infrastructure Project (Project)&nbsp;aims&nbsp;to boost Armenia&#39;s tourism potential through targeted infrastructure and soft investments in&nbsp;several&nbsp;regions. It will support seven (Areni, Yeghegis, Jermuk, Dvin, Gyumri, Dilijan, Goris) of the twenty identified tourism clusters, focusing on wine, wellness, adventure, culture, education, and ecotourism across Ararat, Vayots&nbsp;Dzor, Shirak, Aragatsotn Tavush, and Syunik regions. The Project will improve connectivity to the Clusters and enhance tourism site infrastructure. It also&nbsp;seeks&nbsp;to elevate Armenia&rsquo;s natural assets and human resources, improving business and professional skills in nearby communities to maximize the job creation. Additionally, Project aligns with the World Bank&rsquo;s approach to attracting private investment in these tourism clusters.</p><p>Project development objective (PDO) is to improve access to climate-resilient infrastructure and increase tourism contribution to the local economy of project-supported clusters in Armenia.</p><p><strong>Section 2. Objective of the assignment</strong></p><p>The objective of this assignment is to support ATDF in establishing and implementing a practical and reliable Monitoring and Evaluation (M&amp;E) system for the Project, enabling systematic tracking of project implementation progress, measurement of results and outcomes, and timely reporting against the Project Results Framework.</p><p>Specifically, the Consultant will:</p><ul><li>Operationalize the existing Results Framework (presented in Annex 1);</li><li>Update and validate baseline data where needed;</li><li>Develop and implement a fit-for-purpose M&amp;E methodology;</li><li>Conduct data collection, analysis, and reporting;</li></ul><p><strong>Section 3. Scope of Work</strong></p><p><strong>Task 1: </strong><strong>Operationalization</strong><strong> of Existing M&amp;E Framework (Status Update)</strong></p><p>The Consultant shall:</p><ul><li>Review existing Results Framework, M&amp;E arrangements, indicators, and reporting practices developed under the previous Project (Local Economy and Infrastructure Development Project) and propose changes in the methodology for TRIP.;</li><li>Update and validate baseline data using available sources;</li><li>Develop and document proposed measurement approaches for each indicator, including data sources, collection methods, frequency, responsibilities, and data verification procedures;</li><li>Provide recommendations to strengthen the operationalization and implementation of the Project M&amp;E system, including measures to improve data quality, consistency, and reporting.</li></ul><p><strong>Task 2: Status quo analysis.</strong><strong> </strong></p><p>Prior to Implementation of the Civil works in the target locations the Consultant shall analyze and assess the number of visitors to a given site (subproject) through analyzing formal visitations (e.g. tickets, etc.), hotels, B&amp;Bs, etc. of 2023-2026 years, and other informal means, as well as some qualitative assessment, e.g. view of the quality of infrastructure, site offerings, etc. Consultant shall also:</p><ul><li>Establish baseline values for all PDO and Intermediate Results indicators;</li><li>Develop indicator measurement protocols, including calculation formulas, data sources, verification procedures, treatment of missing data, and responsibilities for data collection and validation;</li><li>Conduct mapping and profiling of tourism-related enterprises and tourism value-chain actors in project-supported clusters.</li></ul><p><strong>Task 3: M&amp;E Methodology and Development</strong></p><p>The Consultant shall develop a practical and implementable M&amp;E methodology, including:</p><ul><li>Indicator reference sheets (definitions, data sources, data disaggregation;</li><li>Data collection methods and sources (surveys, administrative data, other secondary sources);</li><li>Surveys methodologies, including data collection tools and sampling approach (proportionate and feasible);</li><li>Data quality assurance procedures, including identification of limitations related to data availability, response rate, attribution of results, and seasonal variability, and proposed mitigation measures</li><li>Description of the organization and implementation of the field works;</li><li>Data management and storage protocols;</li><li>Reporting templates (quarterly, annual, final).</li></ul><p>The M&amp;E Methodology should include a data collection calendar that allows for counting seasonality, provides guidelines for interviewers on how to conduct surveys in the field and develops survey instruments that are in line with international standards. It also should specify data imputation, parameter estimation methodologies and determine the structure of periodic Results Reports.</p><p>M&amp;E Methodology should be based on all selected regions, a parallel analysis of the project&rsquo;s impacts in the context of tourism development throughout Armenia would be of special interest; in particular, analysis of historical trends (before, during and after the project) of specific tourism indicators at the national level and for different regions.</p><p><strong>Task 3: Pilot Testing and Initial Implementation</strong></p><p>The Consultant shall:</p><ul><li>Design and pilot data collection tools (e.g., visitor surveys, business surveys);</li><li>Conduct pilot data collection in selected clusters;</li><li>Refine tools and methodology based on pilot results;</li><li>Support initial round of data collection.</li></ul><p><strong>Task 4: </strong><strong>Design and Development of a Digital M&amp;E System</strong></p><p>The Consultant shall:</p><ul><li>Design and develop a digital M&amp;E database and indicator tracking solution to support systematic collection, storage, management, and monitoring of project results;</li><li>Develop an interactive dashboard solution (preferably Power BI or equivalent) for tracking, analysis, visualization, and reporting of Project Results Framework indicators, including disaggregation and progress against targets, where applicable; Develop database architecture, data entry templates, user roles, access protocols, and data management procedures to support the long-term operation and sustainability of the M&amp;E system;</li><li>Prepare user guidance materials, operating procedures, and technical documentation for the database and dashboard solution;</li><li>Prepare training and capacity building plan and deliver training and capacity-building sessions for ATDF designated project staff on the use, administration, maintenance, and updating of the M&amp;E database and dashboard tools;</li><li>Support pilot operation, testing, and refinement of the digital M&amp;E system prior to its final handover.</li></ul><p><strong>Task 5: </strong><strong>Reporting and </strong><strong>Results Assessment</strong><strong> </strong></p><p>The Consultant shall:</p><ul><li>Produce periodic M&amp;E reports (quarterly and annual);</li><li>Analyze progress toward PDO and Intermediate Results indicators, identify trends, implementation challenges, and emerging risks;</li><li>Prepare a Final Results Report.</li></ul><p><strong>Section 4. Deliverables</strong></p><p>The Consultant shall deliver the following outputs. All deliverables shall be submitted in <strong>English and Armenian</strong>, in <strong>electronic (editable MS Word/Excel formats)</strong>, and, where required, <strong>two (2) hard copies</strong>.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:64px; vertical-align:top; width:640px\"><p><strong>4.1. Inception Report (Month 1) </strong></p><p><strong>Indicative length:</strong> 15&ndash;20 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Detailed work plan and implementation schedule (Gantt chart);</li><li>Refined understanding of assignment objectives and scope;</li><li>Proposed M&amp;E methodological approach (high-level);</li><li>Mapping of available data sources and stakeholders;</li><li>Risks, assumptions, and mitigation measures;</li><li>Detailed structure of all subsequent deliverables;</li></ul><p><strong>Annexes:</strong></p><ul><li>Draft survey tools (visitor, business, beneficiary);</li><li>Draft indicator reference sheet template;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.2. Status Update Report (Month 2) </strong></p><p><strong>Indicative length: </strong>20 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Review of existing indicators and definitions;</li><li>Updated/validated baseline values (based on available data);</li><li>Identification of data gaps, inconsistencies, and limitations;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.3. Status Quo Analysis Report (For each Cluster prior to the commencement of construction works)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li><strong>Review of baseline information available in the approved Cluster Development Plans (CDPs), feasibility studies, design documentation, official statistics, and other relevant sources supporting the Project Results Framework;</strong></li><li><strong>Assessment of visitor numbers and tourism flows for the period 2023&ndash;2026 using available administrative, statistical, and other relevant data sources;</strong></li><li><strong>Collection of additional baseline information only where existing data are insufficient to establish baseline values or measure the indicators included in the approved Project Results Framework;</strong></li><li><strong>Compilation of baseline values for PDO and Intermediate Results indicators in accordance with the approved Results Framework;</strong></li><li><strong>Identification of data gaps, limitations, and recommendations for future data collection and monitoring;</strong></li><li><strong>Preparation of baseline datasets and supporting documentation for subsequent project monitoring.</strong></li></ul><p><strong>Outputs:</strong></p><p>&bull; Status Quo Analysis Report for each target location/subproject;<br />&bull; Baseline dataset and supporting data tables.<br />&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.4. M&amp;E Methodology and Toolkit (Month 8)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Indicator Reference Sheets (definition, unit, baseline, target, data source);</li><li>Indicator Measurement Protocols for all PDO and Intermediate Results indicators;</li><li>Outcome and impact assessment methodology.</li><li>Data collection methodologies:</li></ul><ul><li>Surveys (visitor, enterprise, beneficiary)</li><li>Administrative and secondary data;</li></ul><ul><li>Sampling approach;</li><li>Data quality assurance and validation procedures;</li><li>Data management and storage protocols, including ethical standards and data privacy protection procedures;</li><li>Reporting framework and standardized templates;</li><li>Data collection calendar (including seasonality considerations).</li></ul><p><strong>Mandatory Annexes:</strong></p><ul><li>Survey questionnaires;</li><li>Data entry and database templates (Excel or compatible);</li><li>Reporting templates (quarterly, annual).</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.5. Pilot Testing and Initial Implementation Report (Month 8)</strong></p><p><strong>Indicative length: </strong>30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Description of pilot implementation (locations, sample size, tools used);</li><li>Results of pilot data collection;</li><li>Identified methodological and operational issues;</li><li>Adjustments made to tools and methodology;</li><li>Finalized data collection instruments and procedures;</li></ul><p><strong>Outputs:</strong></p><ul><li>Revised/final survey instruments and data collection protocols;</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.6. Digital M&amp;E System and Dashboard Package (Month 6)</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Outputs</strong></p><ul><li>Operational digital M&amp;E database;</li><li>Interactive dashboard with user access levels;</li><li>Data entry manual;</li><li>System administration manual;</li><li>Training plan and training materials;</li><li>Training sessions based on the agreed training plan.</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.7. Periodic M&amp;E Reports (Quarterly and Annual)</strong></p><p><strong>Indicative length:</strong> 30&ndash;50 pages</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Progress against intermediate indicators;</li><li>Analysis of trends and performance;</li><li>Key findings and interpretation of results;</li><li>Identification of implementation challenges and risks;</li><li>Recommendations for corrective actions;</li></ul><p><strong>Format requirements:</strong></p><ul><li>Executive summary (max. 2&ndash;3 pages);</li><li>Main analytical narrative;</li><li>Visualizations (charts, graphs, tables);</li></ul></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>4.8. Final Results Report (End of Assignment)</strong></p><p><strong>Indicative length: </strong>up to 80&ndash;100 pages</p><p>&nbsp;</p></td></tr><tr><td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:640px\"><p><strong>Content:</strong></p><ul><li>Overall assessment of project performance against PDO;</li><li>Consolidated analysis of all indicators over time;</li><li>Assessment of project contribution to tourism development;</li><li>Economic analysis;</li><li>Lessons learned and good practices;</li><li>Strategic recommendations for future tourism sector monitoring and similar projects implementation;</li></ul><p><strong>Annexes:</strong></p><ul><li>Indicator time-series tables;</li><li>Methodological notes.</li></ul></td></tr></tbody></table><p>&nbsp;</p><p><strong>Section 5. The composition of Consultant&rsquo;s team and qualifications are the following:</strong><strong> </strong></p><p><strong>Key 1 Team Leader</strong>: hold Master&rsquo;s degree with an emphasis on tourism research, monitoring and evaluation, with at least 5-7 years of similar experience in survey design and execution;</p><p><strong>Key 2 Economic and financial analysis expert</strong>: Bachelor&rsquo;s degree in Economics, Mathematics, Social Sciences or related field with at least 5 years of experience in data collection and analysis.</p><p><strong>Key 3 Performance evaluation specialist</strong>: Bachelor degree in tourism with at least 5 years of experience in data collection and analysis for tourism development. Willing to travel to remote &nbsp;communities and coordinate with team members on related projects;</p><p><strong>Key 4 Qualified Surveyors</strong> in related field with at least 3 years&rsquo; experience in similar M&amp;E assignments /4 specialist/.</p><p>&nbsp;</p><p><strong>Section </strong><strong>6</strong><strong>. Language</strong></p><p>The working language of the report is English and Armenian. All reports should be submitted in hard (2) and electronic copies in both languages.</p><p><strong>Section </strong><strong>7</strong><strong>. Duration</strong></p><p>The Contract shall be signed for an initial period of one (1) year. The Consultant shall be responsible for addressing the Client&rsquo;s comments and finalizing the deliverables until their formal acceptance by the Client. The Contract may be renewed annually, subject to satisfactory performance and the continuing needs of the Project.</p><p><strong>Section </strong><strong>8</strong><strong>. Implementation Arrangements </strong></p><p>The Consultant shall report directly to the ATDF. Close coordination will be required with Tourism Committee, National Statistical Committee (upon need), and other relevant stakeholders. Close coordination with ATDF technical team and construction contractors will also be required. The assignment is on an intermittent basis following the pace of the progress of civil works implementation in each of the selected regions.</p><p>&nbsp;</p><p><strong>Annex 1: Results Framework and Monitoring</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; height:1px; width:942px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Baseline</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 1</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 2</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 3</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 4</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:166px\"><p>Closing Period</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Improve access to climate-resilient infrastructure </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>People benefiting from climate resilient infrastructure (Number of people) CRI </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>532,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>585,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>635,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>810,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>930,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>People benefiting from climate resilient infrastructure - Female (Number of people) CRI</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>212,800</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>234,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>254,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>324,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>372,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>People benefiting from climate resilient infrastructure - Youth (Number of people) CRI</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>159,600</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>175,500</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>190,500</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>243,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>279,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Increase tourism contribution to the local economy of project-supported clusters </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Number of beneficiaries employed (Number of people) CRI </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>300</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>600</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>800</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>Number of beneficiaries employed - Female (Number of people)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>40</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>120</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>240</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>320</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Average tourism spending in project-supported clusters (Amount(USD)) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Dec/2029</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>100</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>120</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>130</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>140</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>150</p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; width:942px\"><p><strong>Intermediate Indicators by Components</strong></p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#f7f7f7; height:1px; width:942px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Baseline</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 1</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 2</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 3</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:148px\"><p>Period 4</p></td><td style=\"background-color:#d0cece; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:166px\"><p>Closing Period</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Fostering Integrated and Sustainable Cluster Development </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Cluster Development Plans completed and approved (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Destination management organizations in the project clusters (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>4</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Management plans developed for museums, cultural and natural heritage sites (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Visitors to project supported clusters (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>500,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>525,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>550,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>600,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>700,000</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>750,000</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Businesses within the tourism value chain benefitting from project activities (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>10</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>20</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>30</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Formal women-led business created and/or strengthened in tourism-related sectors as a result of project interventions (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>15</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>25</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>35</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Supporting climate-resilient infrastructure and promoting private sector participation </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Women in decision-making roles in the Local Working Groups (LWGs) as a result of project interventions (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>30</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>30</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Kilometers of roads rehabilitated (Kilometers) (Kilometers) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>10</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Improved illumination by quantity of LED luminaries (roads/streets/walkways) (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>50</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>150</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>250</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>400</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>500</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Public-Private Partnership projects reaching commercial close (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>1</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Museums and cultural facilities constructed / refurbished (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>5</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Public spaces and parks rehabilitated/upgraded (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>8</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Tourism facilities rehabilitated/constructed (Number) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>8</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>8</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Program Management and Operational Support </strong></p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Project beneficiaries that report that the Project investments reflected their needs (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Dec/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Jan/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>70</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>70</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p>of which, female (Percentage)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Jan/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>35</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>35</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#d9e2f3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Grievances registered and addressed within the FGRM timeframe (Percentage) </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2025</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2026</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2027</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2028</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>Jan/2029</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>Feb/2030</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>0</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:148px\"><p>80</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:166px\"><p>80</p></td></tr><tr><td colspan=\"6\" style=\"background-color:#8eaadb; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:907px\"><p><strong>Contingent Emergency Response Component (CERC) </strong></p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; width:1520px\"><p><strong>Monitoring &amp; Evaluation Plan: </strong><strong>PDO Indicators by PDO Outcomes</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:4px; width:677px\"><p><strong>Improve access to climate-resilient infrastructure</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>People benefiting from climate resilient infrastructure (Number of people) CRI</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>This indicator will measure the number of people (gender and youth disaggregated), such as locals, domestic and international visitors, that will benefit from investments supported by the project that will apply more climate smart and resilient practices during the intervention period.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>Increase tourism contribution to the local economy of project supported clusters</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:677px\"><p><strong>Average tourism spending in Project-supported clusters (amount (USD))</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>The average amount spent by a tourist (international / domestic) for the acquisition of consumption goods and services, as well as valuables, for own use, or to give away, during the visit to a project supported cluster. It includes expenditures by the tourists, as well as expenses that are paid for or reimbursed by others.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:677px\"><p><strong>Number of beneficiaries employed (Number) CRI</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>The aggregate number of people who have gained employment as a direct or indirect result of project activities (gender disaggregated). This includes the temporary jobs (works under a fixed-term contract) created during civil works as well as permanent jobs (works under a contract with no end date) created from project interventions that enhance the potential for individuals to obtain new jobs in the tourism sector within the project supported clusters e.g. through investments in human capital and skills (supply side), and/or promoting growth of firms and employment opportunities in the private sector (demand side).</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:339px\"><p>M&amp;E surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:339px\"><p>ATDF</p></td></tr></tbody></table><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; height:29px; vertical-align:top; width:1520px\"><p>&nbsp;</p><p>&nbsp;</p><p><strong>Monitoring &amp; Evaluation Plan: Intermediate Results Indicators by Components</strong></p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:none; border-left:1px solid black; border-right:none; border-top:none; height:29px; width:1520px\"><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:0px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#93cddc; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:4px; width:680px\"><p><strong>Fostering Integrated and Sustainable Cluster Development</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Cluster development plans completed and approved (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of cluster development plans (Dilijan, Goris, Yeghegis, Jermuk, Dvin), developed by the project and adopted by the Government. Adoption refers to formal approval by the Project Steering Committee. The MoE will be responsible for submitting the final CDPs for approval by the Project Steering Committee and for documenting in the meeting minutes the approval of the CDP(s) as evidence for monitoring purposes.&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Project Steering Committee minutes of meetings</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The approval of the CDPs will be captured in the meeting minutes. ATDF will report periodically on the status of CDPs through progress reports.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Destination management organizations supported in the project clusters (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of established and functioning destination management organizations (Areni, Dilijan, Jermuk and Yeghegis), as defined by the corresponding sublegal act under the Tourism Law, in the project area that have been established and/or benefitted from support through the project.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:17px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:17px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Letter provided by the MoE</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Reported by&nbsp; MoE</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>MoE</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Management plans developed for museums, cultural and natural heritage sites (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of site management plans developed for museums, and cultural and natural heriatge sites in project supported areas. The management plans outline the effective use, preservation, and promotion of cultural and/or tourism assets, ensuring sustainable operations, maintenance, and visitor engagement, and as applicable climate resilience provisions.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Visitors to the project supported clusters (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of visitor arrivals (both domestic and international) to project supported clusters. The metric reflects the growing trends due to enhanced infrastructure, services, or marketing efforts aimed at boosting visitation in the designated clusters.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Biennial&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:24px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:24px; width:501px\"><p>Surveys and analysis of secondary data conducted by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Businesses within the tourism value chain benefitting from project activities (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of businesses within the project clusters&rsquo; tourism value chain, as defined by UNWTO, that have gained direct benefits from project activities. These benefits can include increased revenue, improved services, access to new markets, capacity-building, or enhanced infrastructure.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Surveys conducted by ATDF&nbsp;&nbsp;</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Formal women-led business created and/or strengthened in tourism-related sectors as a result of project interventions (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>The number of legally registered businesses that are newly established or existing businesses that have demonstrably improved their operations, profitability, and/or sustainability (e.g. increased revenues, expanded operations, enhanced market access, improved financial management)&nbsp;as a result of project interventions. Woman-led refers to businesses whereby woman/women hold a majority ownership stake and/or a key leadership position such as Chief Executive Officer, Managing Director, etc.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>Surveys</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; vertical-align:top; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#95b3d7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Supporting Climate-resilient Infrastructure and Enhancing Capacities</strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Women in decision-making roles in the Local Working Groups (LWGs) as a result of project interventions (Percentage)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of women directly involved in Local Working Groups at the community level engaged throughout the preparation of CDPs and implementation of prioritized investments under the project.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Kilometers of roads rehabilitated (Kilometers)</strong><strong> </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The kilometers of all-season roads newly constructed or rehabilitated that are within a 500 meter range from project supported clusters. All rehabilitation works will consider and incorporate disaster and climate resilience measures in accordance with national standards and global best practice, such as proper route selection, applying weather-resistant materials to withstand extreme weather conditions, implementing slope stabilization measures, improving the drainage/culverts, as applicable.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Museums and cultural facilities constructed/refurbished (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of museums and cultural facilities that have been newly constructed or refurbished as a result of project interventions. This includes the resilient, energy efficient development or improvement of the infrastructure required to enhance the preservation, display, and accessibility of cultural assets, archeological artefacts, art for public engagement and tourism. All newly constructed facilitiies will adhere to energy efficiency standards equivalent to EDGE Level-1.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Improved illumination by quantity of LED luminaries (roads/streets/walkways) (Number) </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The indicator will measure the number of light emitting diode (LED) luminaries installed.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Public-Private Partnership projects reaching commercial close (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The number of Public-Private Partnership project/s that have benefitted from assessments, designs, and preparatory support through the Project and have finalized the contractual agreements between the public and private sector, allowing to move forward with implementation of the PPP. This stage will signify the completion of negotiations and the readiness to commence the investment project activities, and thus achievement of the target.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Public spaces and parks rehabilitated/upgraded&nbsp;(Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of rehabilitated or upgraded public areas, including parks and green spaces.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Tourism facilities rehabilitated/constructed (Number)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Number of tourism facilities that have been rehabilitated or newly constructed as part of project activities. This includes climate and disaster resilient improvements or new developments to infrastructure such as visitor centers or other tourism-related amenities. Rehabilitation will prioritize improvements of energy efficiency, and all newly constructed buildings will adhere to energy efficiency standards to energy efficiency standards equivalent to EDGE Level-1.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#95b3d7; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Program Management and Operational Support </strong></p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Share of project beneficiaries that report that the project interventions reflected their needs (percentage) &nbsp;&nbsp; </strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of project beneficiaries who report that the interventions made under the project align with their needs and priorities. This metric reflects the level of satisfaction and relevance of the project interventions in addressing the specific needs and expectations of the target communities or stakeholders.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#dbeef3; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:680px\"><p><strong>Grievances registered and addressed within the FGRM timeframe (percentage)</strong></p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Description</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>The percentage of grievances registered related to Project activities addressed within Feedback and Grievance Redress Mechanism timeframe related to delivery of Project benefits addressed.</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Frequency</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Semi-annual</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Data source</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reports prepared by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Methodology for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>Progress reporting by ATDF</p></td></tr><tr><td style=\"background-color:#eeece1; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:4px; width:180px\"><p>Responsibility for Data Collection</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:4px; width:501px\"><p>ATDF</p></td></tr></tbody></table><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p>"},{"id":"OP00459535","notice_type":"Request for Expression of Interest","noticedate":"12-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-21T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Moldova","project_id":"P177895","project_name":"MSME Competitiveness Project","bid_reference_no":"MD-CEP-547273-CS-CQS","bid_description":"Consulting Services on Strengthening the level of competence and know-how transfer on operation of the metrology equipment (2nd batch)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"180, Stefan cel Mare, office 815, Chisinau","contact_ctry_name":"Moldova","contact_email":"piu@mded.gov.md","contact_name":"Aureliu Casian","contact_organization":"Project Implementation Unit of the Competitiveness Enhancement Project","contact_phone_no":"+37322296723","contact_web_url":"www.uipac.md","submission_date":"2026-08-12T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><p><strong>CONSULTING SERVICES ON STRENGTHENING THE LEVEL OF COMPETENCE AND KNOW HOW TRANSFER </strong></p><p><strong>ON OPERATION OF THE METROLOGY EQUIPMENT</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>REPUBLIC OF MOLDOVA</strong></p><p><strong>MICRO, SMALL AND MEDIUM-SIZED ENTERPRISES COMPETITIVENESS PROJECT</strong></p><p>Sector: General industry and trade sector</p><p>IDA Credit No. 71740</p><p>IBRD Loan No. 94230</p><p>Project ID No. P177895</p><p>Reference No. MD-CEP-547273-CS-CQS</p><p>&nbsp;</p><p>The Republic of Moldova has received financing from the World Bank toward the cost of the Micro, Small and Medium-Sized Enterprise Competitiveness Project (MSME) and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include enhancement the technical competence and knowledge of NMI&rsquo; specialists through comprehensive training and structured know-how transfer, focusing on both theoretical knowledge and practical skills in the following domains: (i) electrical measurements; (ii) ionization and radiation measurements; (iii) flow and volume measurements and (iv) acoustic measurements. To achieve the assignment&rsquo;s objectives, the Consultant shall develop the training materials and deliver trainings for NMI specialists at the NMI premises and ensure practical on-site trainings for specialists of NMI at Consultant&rsquo; premises according to the topics, duration and timeline suggested in ToR.</p><p>&nbsp;</p><p>The assignment will be performed in the period <strong>October - December, 2026. </strong>&nbsp;</p><p>The Terms of Reference (TOR) for the assignment is attached to this request for expressions of interest<em>.</em></p><p>&nbsp;</p><p>The Project Implementation Unit of the MSME Competitiveness Project now invites eligible local consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (required qualifications and experience of the firm, but not individual experts&rsquo; bio data).</p><p>&nbsp;</p><p>This assignment will require an EURAMET metrology institute or consortium of such metrology institutes with appropriate technical and metrological qualification, comparable standards and internationally recognized knowledge, which:<em> </em></p><ul><li>Has relevant competence in the field electrical, ionization and radiation, flow and volume measurements, acoustic measurements, including relevant Calibration and Measurement Capabilities reflected in the Bureau International des Poids et Measures (BIPM) key comparison database.</li><li>Has demonstrated previous experience in providing similar internship and/or trainings in relevant subject fields.</li><li>Has experience in the implementation of the donors&rsquo; and/or IFI&rsquo;s sponsored projects.</li><li>Has experience in preparation of analytical reports, training programs and training curricula.</li></ul><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; A Consultant will be selected in accordance with the &bdquo;Consultant&rsquo;s Qualification-based Selection&rdquo; method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications; but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>The Expression of Interest shall clearly state the name of the Consultant (individual Firm, Joint Venture or sub-consultancy). The Consultant shall provide relevant references (assignment name, Client, time frame, the role of the firm (main Consultant/Partner in JV/sub-consultant, contract amount, tasks performed etc.) to confirm its experience and qualifications.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>August 11, 2026</strong>, COB.</p><p>&nbsp;</p><p>Project Implementation Unit of the MSME Competitiveness Project</p><p>180, Stefan cel Mare Ave., office 815, MD-2004, Chisinau, Republic of Moldova</p><p>Tel:&nbsp; + 373 22&nbsp;296-723</p><p>e-mail: piu@mded.gov.md</p><p>web:&nbsp;&nbsp;&nbsp;&nbsp; www.uipac.md</p><p>&nbsp;</p><p>E-mail for submission of the <strong>clarifications: piu@mded.gov.md</strong></p><p>&nbsp;</p><p>E-mail for submission of the <strong>EoIs: procurementmgf@gmail.com</strong>&nbsp;</p><p>&nbsp;</p><p><strong>Only the notification of EoI submission must be sent to piu@mded.gov.md<br />&nbsp;</strong><strong>Terms of Reference</strong></p><p><strong>Consulting Services on strengthening the level of competence and know how transfer on operation of the metrology equipment</strong> <strong>&nbsp;</strong></p><p>&nbsp;</p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; INTRODUCTION</strong></p><p>The Government of the Republic of Moldova (GoM) is pursuing a policy agenda to support export-led economic growth. In this regard, an improved business environment is essential to foster sustainable private sector growth. Significant regulatory and institutional weaknesses in the business environment have been identified by the recently conducted Investment Climate Assessment as major obstacles to the private sector&rsquo;s ability to perform efficiently and grow, and they also negatively affect investor confidence. The presence of cumbersome regulations undermines the competitiveness of private Moldovan enterprises and prevents increased investment by increasing the cost of doing business, and ultimately providing fertile ground for corruption, favoritism, and the informal economy.</p><p>GoM is currently implementing a project - the Micro, Small, Medium Enterprises (MSME) Competitiveness Project, which takes a comprehensive approach to business competitiveness with funding from the International Development Association and the International Bank for Reconstruction and Development.</p><p>The MSME&rsquo;s project development objectives (PDO) are: (i) to reduce the regulatory burden, increase access to finance, increase the export competitiveness of Moldovan enterprises, and (ii) in case of an Eligible Crisis or Emergency, to respond promptly and effectively to it.</p><p>The PDO will be achieved through a set of activities that aim to: (a) digitize government-to-business services and inspections, streamline permissive documents, and enhance national quality infrastructure to reduce the regulatory burden enterprises face; (b) support access to finance for enterprises through credit guarantees and enhance the capacity of the Credit Guarantee Fund (CGF), and (c) support the development of MSMEs and enhance their export competitiveness; d) support project management; e) support the government&#39;s response in case of an emergency.</p><p>&nbsp;</p><p><strong>B.&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; BACKGROUND OF THE ASSIGNMENT</strong></p><p>The target segment of the current assignment is National Quality Infrastructure System (NQI).<strong> </strong>NQI activities under the project focuses on increasing MSME competitiveness and enabling exports. The NQI activities aim at addressing the enterprise sector&rsquo;s difficulties in competing in foreign markets caused by the existing gaps in NQI and services. Improving the NQI system will be achieved through: (a) building capacity in metrology and testing area by upgrading selected laboratories and strengthening institutional capacity in order to expand the list of measurements and testing demanded by export oriented firms; (b) ensuring the traceability of the measurements performed to enterprises, as well as access to quality infrastructure services due to increased number of calibrations and accredited cross-comparisons at the European Union (EU) level and (c) strengthening accreditation and certification capacity.&nbsp;</p><p>Investment and technical assistance needs are significantly higher than what the Project can support. Thus, an allocation of approximately US$7 million equivalent will address these priority needs. Special attention will be paid to building skills among specialists to perform measurements and ensure more laboratories and services are accredited meeting the EU requirements.</p><p>Within this framework, the Government of Moldova through the Ministry of Economic Development and Digitalization (the Client) and the National Metrology Institute (the Beneficiary) are seeking the services of an EURAMET member metrology institute (<strong><em>hereinafter Consultant</em></strong>), who has relevant expertise in the field of the assignment to provide the know-how transfer and training of the specialists of the National Institute of Metrology of the Republic of Moldova (<strong><em>hereinafter NMI</em></strong>).</p><p>&nbsp;</p><p><strong>C. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Objectives of the Assignment</strong></p><p>The <strong><em>main objectives </em></strong>of the assignment are to enhance the technical competence and knowledge of NMI&rsquo; specialists through comprehensive training and structured know-how transfer, focusing on both theoretical knowledge and practical skills in the following domains: <u>(i) electrical measurements; (ii) ionization and radiation measurements; (iii) flow and volume measurements and (iv) acoustic measurements</u>.</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Task to be performed (Scope of Work)</strong></p><p>To achieve the assignment&rsquo;s objectives, the Consultant shall develop the training materials and deliver <strong><em>trainings</em></strong> for NMI specialists at the NMI premises and ensure <strong><em>practical </em></strong><strong><em>on-site trainings</em></strong> for specialists of NMI at Consultant&rsquo; premises according to the topics, duration and timeline suggested below<strong>.</strong></p><p><strong><u>TASK I - Electrical Measurements</u></strong><u> </u></p><p>For the topics related to electrical measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>electrical measurements </em>as follows:</li></ul><ol><li><strong>Energy and electrical power standard metrology</strong></li></ol><p>Further below a detailed technical composition of the expected training topics is presented.</p><ul><li>The normative documentation in the field with requirements and technical aspects;</li><li>Technical and metrology aspects;</li><li>Correct handling of instruments (care and maintenance);</li><li>Calibration procedures;</li><li>Identification and evaluation of uncertainty factors;</li><li>Determining and calculating uncertainty;</li><li>Reporting results;</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of INM clients.</li></ul><p>&nbsp;</p><p><strong>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:282px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:140px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:104px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:140px\"><p>4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:104px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:140px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:104px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of the <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory;</li><li>19 hours laboratory practice;</li><li>10 hours result evaluation and preparation of calibration certificate;</li><li>3 hours practical evaluation of knowledge.</li></ul><p><u>Training at NMI premises</u>:</p><ul><li>8 hours theory;</li><li>16 hours laboratory practice;</li><li>12 hours result evaluation and preparation of calibration certificate;</li><li>4 hours practical evaluation of knowledge.</li></ul><ol><li><strong>High-frequency signal power and High stability Standard Resistor</strong></li></ol><p>Further below a detailed technical composition of the expected training topics is presented.</p><ul><li>The Normative documentation in the field with requirements and technical aspects;</li><li>Technical and metrology aspects;</li><li>Correct handling of instruments (care and maintenance);</li><li>Calibration procedures;</li><li>Identification and evaluation of uncertainty factors;</li><li>Determining and calculating uncertainty;</li><li>Reporting results;</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of INM-MD clients.</li></ul><p>&nbsp;</p><p><strong>Tentative schedule, duration and number of participants is described below.</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory</li><li>19 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge.</li></ul><p><u>Training at NMI premises</u>:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge.</li></ul><p>&nbsp;</p><p><strong><u>TASK II- Ionization and radiation measurements</u></strong><u> </u></p><p>For the topics related to ionization and radiation measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>ionization and radiation measurements </em>as follows:</li></ul><ol><li><strong>Quality Control of the X-ray systems</strong><strong> </strong></li></ol><p>Further below a detailed technical composition of the expected training topics is presented.</p><ul><li>Technical aspects of X-ray system</li><li>Testing procedure</li><li>Testing parameters</li><li>The Normative documentation in the field with requirements and technical aspects</li><li>Testing Parameters</li><li>Assurance of metrological traceability for involved standards in testing procedure</li><li>Determination of the irradiation beam</li><li>Evaluations of measurement uncertainty</li><li>Quality assurance of the X-ray system</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>4 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>4 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory</li><li>17 hours laboratory practice</li><li>12 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge</li></ul><p>Training at INM premises:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation</li><li>4 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>TASK III &ndash; Flow and Volume measurements</u></strong><u> </u></p><ol><li><strong>Advanced training for calibration of water meters, flow meters and small flow metrology</strong></li></ol><p>For the topics related to flow and volume measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>flow and volume measurements </em>as follows:</li></ul><p>&nbsp;</p><p>Further below a detailed technical composition of the expected training topics is presented:</p><ul><li>Calibration water meter test bench, use of volumetric method, mass, piston, estimation of measurement uncertainties, influence factors</li><li>Maintenance of the water meter test bench, estimation of calibration periodicity</li><li>Determination of the minimum volume to be measured, depending on the accuracy class, division value, measurement uncertainty</li><li>Determination of the minimum flow time, depending on the accuracy class, division value, measurement uncertainty</li><li>Calibration of water meters, flow meters, estimation of measurement uncertainties, influence factors</li><li>Reading the indications on the water meter, flow meter through, impulse, current, frequency, dry signal, opto port, optical signal. Connection method, rules, influences on the signal, auxiliary equipment required for connection</li><li>How often should water be changed, from water meter test bench, water treatment methods, to prevent salt deposition</li><li>Determining the calibration period of water meters, flow meters, water meter test bench</li><li>Determination of the influence of pressure in the closed pipe, on measurement uncertainties</li><li>European directives on water meters, requirements, scope</li><li>European and international standards in the field of water meters, requirements, scope, technical aspects</li><li>Calibration of the test bench, consisting of water meters (ultrasonic, Coriolis) located at the customer&#39;s premises</li><li>Selection of standards</li><li>Advantages and disadvantages of meter calibrations in the test bench component, at the customer&#39;s premises</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of the training at Consultant&rsquo; premises:</p><ul><li>8 hours theory</li><li>19 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge</li></ul><p>Training at INM premises:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><ol><li><strong>Advanced training for calibration of gas flow meters</strong></li></ol><p>Further below a detailed technical composition of the expected training topics is presented:</p><ul><li>Calibration of the test bench for gas meter calibration, with standard meters, bell piston, critical nozzles, bell, estimation of measurement uncertainties, influence factors</li><li>Installation maintenance, estimation of calibration frequency</li><li>Determination of the minimum volume to be measured, depending on the meter type, accuracy class, division value, measurement uncertainty</li><li>Determination of the minimum flow duration, depending on the meter type, accuracy class, division value, measurement uncertainty</li><li>Calibration of gas meters (rotor, turbine, drum) estimation of measurement uncertainties, influence factors</li><li>Calibration of critical nozzles, estimation of measurement uncertainties, influence factors, mounting conditions</li><li>Reading of meter indications by pulse, current, frequency, dry signal, opto port, optical signal. Connection method, rules, influences on the signal, auxiliary equipment required for connection</li><li>How often should critical nozzles in the component be cleaned, test bench for calibration of gas meters, how to clean them correctly</li><li>Determining the calibration period of gas meters (rotor, turbine, drum), test bench for calibration of gas meters, critical nozzles</li><li>European directives on gas meters, requirements, scope</li><li>European and international standards in the field of gas meters, requirements, scope, technical aspects</li><li>Calibration of the test bench, consisting of gas meters (rotor, turbine, drum) located at the customer&#39;s premises,</li><li>Advantages and disadvantages of meter calibrations in the test bench component, at the customer&#39;s premises</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of the training at Consultant&rsquo; premises:</p><ul><li>8 hours theory</li><li>19 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p>Training at INM premises:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p><strong><u>TASK IV &ndash; Acoustic</u></strong><em><u> </u></em><strong><u>measurements</u></strong><u> </u></p><p>For the topics related to flow and volume measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>acoustic measurements </em>as follows:</li></ul><p>&nbsp;</p><p><strong>Basics of acoustic metrology</strong></p><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Introduction in acoustic metrology;</li><li>The Normative documentation in the field with requirements and technical aspects;</li><li>Technical and metrology aspects;</li><li>Correct handling of instruments (care and maintenance);</li><li>Calibration procedures;</li><li>Identification and evaluation of uncertainty factors;</li><li>Determining and calculating uncertainty;</li><li>Reporting results;</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of INM-MD client</li><li>Support of interlaboratory comparison</li></ul><p>&nbsp;</p><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory</li><li>35 hours laboratory practice</li><li>12 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge</li></ul><p>Training at INM premises:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge</li></ul><p><strong>Advance training in acoustic metrology with focus to microphones and sound meters metrology</strong></p><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Theory of acoustic metrology with focus to microphones and sound meters;</li><li>The normative documents for microphones and sound meters;</li><li>Technical and metrology aspects of acoustic calibrators;</li><li>Correct handling of instruments (care and maintenance);</li><li>Calibration procedures for microphones and sound meters;</li><li>Identification and evaluation of uncertainty factors for microphones and sound meters;</li><li>Determining and calculating uncertainty for microphones and sound meters;</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of INM-MD client;</li><li>Support of interlaboratory comparison in field of microphones and/or sound meters.</li></ul><p>&nbsp;</p><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>16 hours theory</li><li>40 hours laboratory practice</li><li>16 hours result evaluation and preparation of calibration certificate</li><li>8 hours practical evaluation of knowledge</li></ul><p>Training at INM premises:</p><ul><li>16 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Details of the assignment</strong></p><p>Theoretical trainings will be provided in Chisinau within NMI&rsquo; facilities. Estimated duration of the trainings is estimated at 32 days or around 256 academic hours. The Consultant shall be granted an additional period of approximately six (6) calendar days for the preparation and submission of reports and deliverables. The allocation of working days required for the development of theoretical and practical training materials shall be proposed by the Consultant and shall include a reasonable timeframe for their elaboration.</p><p>&nbsp;</p><p>Practical training (on-site training) will be provided abroad within the Consultant&rsquo; laboratory. Each on-site training will be structured for 3-5 days /domain.</p><p>&nbsp;</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Common details and requirements for the Consultant&rsquo;s work</strong></p><p>The consecutiveness of the task accomplishment is free, at the opinion of the consultant and according the availableness of the trainers and bodies that will be involved in realisation of the project.</p><p>Recommended documents, language:</p><ul><li>All key theoretical training materials, printed documents including Power-Point applications, will be delivered in English. Each participant will receive hand-outs of the related training material. The training materials and document during the trainings will be available in English.</li><li>The supporting documents should have added value, importance and significance for participants in respect to the objectives described.</li></ul><p>The Consultant will have to consider for expenditure estimation, <em>inter alia,</em> the following items of the costs:</p><ul><li>Fees for trainers (training in Moldova plus preparation/reporting at home), daily allowance for staying in Moldova;</li><li>Cost of necessary international and local travel, including transportation of the Personnel of the Consultant by the most appropriate means of transport and the most direct practicable route;</li><li>Cost of applicable international or local communications such as the use of telephone and email required for the purpose of the Services;</li><li>Development presentations and supporting documents in English Printing materials;</li><li>Renting training room (including refreshment);</li><li>Renting technical equipment (data projector, interpretation facilities);</li><li>Organization and logistics etc. at place;</li><li>Fees for laboratory use, if applicable;</li><li>In-country travel costs for Moldovan specialists during the internships (i.e. airport pick-up and drop, etc);</li><li>Development presentations and supporting documents in English (internships)</li></ul><p>&nbsp;</p><p>The Consultant <strong><em>shall be responsible</em></strong> for:</p><ul><li>Carrying out the required assessment at best level;</li><li>Coordination of the progress status with the National Institute of Metrology (NMI) and PIU for MSME;</li><li>Producing, for delivery to the NMI and MSME PIU of all specified below deliverables in a timely manner and acceptable quality.</li></ul><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reports / Deliverable</strong><strong>s</strong></p><p>Within the time frame of this assignment, the Consultant will be expected to develop the following deliverables:</p><ul><li><em>First Progress Report</em>. This paper will comprise <em>inter alia</em> <em>(i)</em> theoretical training programs; <em>(ii)</em> training materials by training topic based on training programs and <em>(iii)</em> description and planning how the practical trainings (internships) will be organized, <em>inter alia</em> agenda for the internship. The report will be submitted within four weeks after commencing the assignment.</li><li><em>Second Progress Report. </em>This paper will include the report on theoretical training sessions delivered by the Consultant to specialists of NMI. The report will be submitted within eight weeks after commencing the assignment.<em> </em></li><li><em>Third Progress Report.</em> This paper will include the report on practical trainings (internships) provided by the Consultant. The report will be submitted within eleven weeks after commencing the assignment.</li><li><em>Final Report</em>. The Final Report is the report comprising all the assignment results. The Report will be submitted within fourteen weeks after commencing the assignment.</li></ul><p>The NMI and PIU may provide comments to the deliverables, which should be addressed by the Consultant accordingly.</p><p>&nbsp;</p><p>All Deliverables will be provided in electronic form and in hard copies (if required). The language of the deliverables shall be English.</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>PERIOD and TERMS of the ASSIGNMENT</strong></li></ol><p>The assignment shall be implemented in the period from October to December 2026.</p><p>&nbsp;</p><ol><li><strong>&nbsp;Local Inputs</strong></li></ol><p>The NMI will provide to the Consultant the following available materials and support:</p><ul><li><ul><li>Logistical support relevant to the assignment;</li><li>Information on type and models of the metrology equipment available within the metrology laboratories of the Client.</li></ul></li></ul><p>&nbsp;</p><ol><li><ol><li><ol><li><strong>Requirements for the assignment</strong></li></ol></li></ol></li></ol><p>This assignment will require an EURAMET metrology institute with appropriate technical and metrological qualification, comparable standards and internationally recognized, which:<em> </em></p><ul><li>Has relevant competence in the field electrical, ionization and radiation, flow and volume measurements, acoustic measurements, including relevant Calibration and Measurement Capabilities reflected in the Bureau International des Poids et Measures (BIPM) key comparison database.</li></ul><ul><li>Has demonstrated previous experience in providing similar internship and/or trainings in relevant subject fields.</li><li>Has experience in the implementation of the donors&rsquo; and/or IFI&rsquo;s sponsored projects.</li><li>Has experience in preparation of analytical reports, training programs and training curricula.</li></ul><p>&nbsp;</p><p><strong>k.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Terms of payment</strong><strong> </strong></p><p>The Contract will be the Standard World Bank Lump-sum contract.&nbsp;</p><p>&nbsp;</p><p>Tentative payment schedule is provided below:</p><p>&nbsp;</p><ol><li>advance payment, in the amount of 10% of the contract &ndash; within 30 days after signing of the contract.</li><li>2nd payment, in the amount of 25% of the contract - within 30 days after approval of the first progress report.</li><li>3rd payment, in the amount of 25% of the contract - within 30 days after approval of the second progress report.</li><li>4th payment, in the amount of 25% of the contract - within 30 days after approval of the third progress report.</li><li>Final payment, in the amount of 15% of the contract - within 30 days after approval of the final report.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00441104","notice_type":"Request for Expression of Interest","noticedate":"12-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-21T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Moldova","project_id":"P177895","project_name":"MSME Competitiveness Project","bid_reference_no":"MD-CEP-547270-CS-CQS","bid_description":"Consulting Services on Strengthening the level of competence and know-how transfer on operation of the metrology equipment (1st batch)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"180, Stefan cel Mare, office 815, Chisinau","contact_ctry_name":"Moldova","contact_email":"piu@mded.gov.md","contact_name":"Aureliu Casian","contact_organization":"Project Implementation Unit of the Competitiveness Enhancement Project","contact_phone_no":"+373296729","contact_web_url":"www.uipac.md","submission_date":"2026-08-12T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><p>CONSULTING SERVICES <strong>ON STRENGTHENING THE LEVEL OF COMPETENCE AND KNOW HOW TRANSFER ON OPERATION OF THE METROLOGY EQUIPMENT (1ST BATCH)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>REPUBLIC OF MOLDOVA</strong></p><p><strong>MICRO, SMALL AND MEDIUM-SIZED ENTERPRISES COMPETITIVENESS PROJECT</strong></p><p>Sector: General industry and trade sector</p><p>IDA Credit No. 71740</p><p>IBRD Loan No. 94230</p><p>Project ID No. P177895</p><p>Reference No. MD-CEP-547270-CS-CQS</p><p>&nbsp;</p><p>The Republic of Moldova has received financing from the World Bank toward the cost of the Micro, Small and Medium-Sized Enterprise Competitiveness Project (MSME) and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include enhancement the technical competence and knowledge in the field of mass metrology of Moldovan NMI specialists through comprehensive training and structured know-how transfer, focusing on both theoretical knowledge and practical skills in the following domains: (i) Mass measurements; (ii) Length measurements; (iii) Pressure measurements and (iv) Force measurements. To achieve the assignment&rsquo;s objectives, the Consultant shall develop the training materials and deliver trainings for NMI specialists at the NMI premises and ensure practical on-site trainings for specialists of NMI at Consultant&rsquo; premises according to the topics, duration and timeline suggested in ToR.</p><p>&nbsp;</p><p>The assignment will be performed in the period <strong>May - July, 2026. </strong>&nbsp;</p><p>The Terms of Reference (TOR) for the assignment is attached to this request for expressions of interest<em>.</em></p><p>&nbsp;</p><p>The Project Implementation Unit of the MSME Competitiveness Project now invites eligible local consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (required qualifications and experience of the firm, but not individual experts&rsquo; bio data).</p><p>&nbsp;</p><p>This assignment will require an EURAMET metrology institute or consortium of such metrology institutes with appropriate technical and metrological qualification, comparable standards and internationally recognized knowledge, which:<em> </em></p><ul><li>Has relevant competence in the field of length, mass pressure and force measurements including relevant Calibration and Measurement Capabilities in the Bureau International des Poids et Measures (BIPM) key comparison database.</li></ul><ul><li>Has demonstrated previous experience in providing similar internship and/or trainings in relevant subject fields.</li><li>Has experience in the implementation of the donors&rsquo; and/or IFI&rsquo;s sponsored projects.</li></ul><ul><li>Has experience in preparation of analytical reports, training programs and training curricula.</li></ul><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; A Consultant will be selected in accordance with the &bdquo;Consultant&rsquo;s Qualification-based Selection&rdquo; method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications; but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>The Expression of Interest shall clearly state the name of the Consultant (individual Firm, Joint Venture or sub-consultancy). The Consultant shall provide relevant references (assignment name, Client, time frame, the role of the firm (main Consultant/Partner in JV/sub-consultant, contract amount, tasks performed etc.) to confirm its experience and qualifications.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>May 11, 2026</strong>, COB.</p><p>&nbsp;</p><p>Project Implementation Unit of the MSME Competitiveness Project</p><p>180, Stefan cel Mare Ave., office 815, MD-2004, Chisinau, Republic of Moldova</p><p>Tel:&nbsp; + 373 22&nbsp;296-723</p><p>e-mail: piu@mded.gov.md</p><p>web:&nbsp;&nbsp;&nbsp;&nbsp; www.uipac.md</p><p>&nbsp;</p><p>E-mail for submission of the <strong>clarifications: piu@mded.gov.md</strong></p><p>&nbsp;</p><p>E-mail for submission of the <strong>EoIs: procurementmgf@gmail.com</strong>&nbsp;</p><p>&nbsp;</p><p><strong>Only the notification of EoI submission must be sent to piu@mded.gov.md<br />&nbsp;</strong><strong>Terms of Reference</strong></p><p><strong>Consulting Services on strengthening the level of competence and know how transfer on operation of the metrology equipment (1st batch)</strong> <strong>&nbsp;</strong></p><p>&nbsp;</p><p><strong>A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; INTRODUCTION</strong></p><p>The Government of the Republic of Moldova (GoM) is pursuing a policy agenda to support export-led economic growth. In this regard, an improved business environment is essential to foster sustainable private sector growth. Significant regulatory and institutional weaknesses in the business environment have been identified by the recently conducted Investment Climate Assessment as major obstacles to the private sector&rsquo;s ability to perform efficiently and grow, and they also negatively affect investor confidence. The presence of cumbersome regulations undermines the competitiveness of private Moldovan enterprises and prevents increased investment by increasing the cost of doing business, and ultimately providing fertile ground for corruption, favoritism, and the informal economy.</p><p>GoM is currently implementing a project - the Micro, Small, Medium Enterprises (MSME) Competitiveness Project, which takes a comprehensive approach to business competitiveness with funding from the International Development Association and the International Bank for Reconstruction and Development.</p><p>The MSME&rsquo;s project development objectives (PDO) are: (i) to reduce the regulatory burden, increase access to finance, increase the export competitiveness of Moldovan enterprises, and (ii) in case of an Eligible Crisis or Emergency, to respond promptly and effectively to it.</p><p>The PDO will be achieved through a set of activities that aim to: (a) digitize government-to-business services and inspections, streamline permissive documents, and enhance national quality infrastructure to reduce the regulatory burden enterprises face; (b) support access to finance for enterprises through credit guarantees and enhance the capacity of the Credit Guarantee Fund (CGF), and (c) support the development of MSMEs and enhance their export competitiveness; d) support project management; e) support the government&#39;s response in case of an emergency.</p><p>&nbsp;</p><p><strong>B.&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; BACKGROUND OF THE ASSIGNMENT</strong></p><p>The target segment of the current assignment is National Quality Infrastructure System (NQI).<strong> </strong>NQI activities under the project focuses on increasing MSME competitiveness and enabling exports. The NQI activities aim at addressing the enterprise sector&rsquo;s difficulties in competing in foreign markets caused by the existing gaps in NQI and services. Improving the NQI system will be achieved through: (a) building capacity in metrology and testing area by upgrading selected laboratories and strengthening institutional capacity in order to expand the list of measurements and testing demanded by export oriented firms; (b) ensuring the traceability of the measurements performed to enterprises, as well as access to quality infrastructure services due to increased number of calibrations and accredited cross-comparisons at the European Union (EU) level and (c) strengthening accreditation and certification capacity.&nbsp;</p><p>Investment and technical assistance needs are significantly higher than what the Project can support. Thus, an allocation of approximately US$7 million equivalent will address these priority needs. Special attention will be paid to building skills among specialists to perform measurements and ensure more laboratories and services are accredited meeting the EU requirements.</p><p>Within this framework, the Government of Moldova through the Ministry of Economic Development and Digitalization (the Client) and the National Metrology Institute (the Beneficiary) are seeking the services of an EURAMET member metrology institute (<strong><em>hereinafter Consultant</em></strong>), who has relevant expertise in the field of the assignment to provide the know-how transfer and training of the specialists of the Moldovan National Metrology Institute (<strong><em>hereinafter NMI</em></strong>).</p><p>&nbsp;</p><p><strong>C. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Objectives of the Assignment</strong></p><p>The <strong><em>main objectives </em></strong>of the assignment are to enhance the technical competence and knowledge in the field of mass metrology of Moldovan NMI specialists through comprehensive training and structured know-how transfer, focusing on both theoretical knowledge and practical skills in the following domains: <em><u>(i) Mass measurements; (ii) Length measurements; (iii) Pressure measurements and (iv) Force measurements</u></em>.</p><p><strong>D.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Task to be performed (Scope of Work)</strong></p><p>To achieve the assignment&rsquo;s objectives, the Consultant shall develop the training materials and deliver <strong><em>trainings</em></strong> for NMI specialists at the NMI premises and ensure <strong><em>practical </em></strong><strong><em>on-site trainings</em></strong> for specialists of NMI at Consultant&rsquo; premises according to the topics, duration and timeline suggested below<strong>.</strong></p><p><strong><u>TASK I - Mass Measurements</u></strong><u> </u></p><p>For the topics related to mass measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>mass measurements </em>as follows:</li></ul><ol><li><strong>Advanced Training for Calibrating Standard Weights</strong></li></ol><p>Further below a detailed technical composition of the expected training topics is presented.</p><p>Application of advanced calibration methods under controlled conditions including:</p><ul><li>Preparation of weights for calibration;</li><li>Gravimetric vs. comparative calibration;</li><li>Choice of equipment and correct handling;</li><li>Determination of conventional and real mass;</li><li>Control of external influences (humidity, temperature, pressure).</li></ul><p>Correct development of uncertainty budgets according to GUM including:</p><ul><li>Types of uncertainty: type A and type B;</li></ul><ul><li>Applied examples of uncertainty budgets;</li><li>Extended calculation and expression of results;</li><li>Estimation of individual contributions: equipment, operator, environment.</li></ul><p>Ensuring the quality of the calibration process and traceability of results including:</p><ul><li>Metrological traceability: the traceability chain and national standards;</li><li>Writing calibration reports;</li><li>Document archiving, retention and review requirements;</li><li>Preparation for ISO/IEC 17025 audit.</li></ul><p>Applying knowledge in real situations and developing analytical skills including:</p><ul><li>Complete calibration of a set of weights (practical);</li><li>Identification and correction of possible errors;</li><li>Case study: internal audit simulation with technical file analysis.</li><li>Support of interlaboratory comparison</li></ul><p>&nbsp;</p><p><strong>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:282px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:140px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:104px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:140px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:104px\"><p>4 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:282px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:140px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:104px\"><p>4 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of the <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory;</li><li>19 hours laboratory practice;</li><li>10 hours result evaluation and preparation of calibration certificate;</li><li>3 hours practical evaluation of knowledge.</li></ul><p><u>Training at NMI premises</u>:</p><ul><li>8 hours theory;</li><li>16 hours laboratory practice;</li><li>12 hours result evaluation and preparation of calibration certificate;</li><li>4 hours practical evaluation of knowledge.</li></ul><ol><li><strong>Advanced Training for Calibrating Non-Automatic Weighing Instruments</strong></li></ol><p>A detailed technical composition of the expected training topics is presented further below.</p><p>Application of advanced calibration methods under controlled conditions including:</p><p>Complete understanding of the calibration method described in the EURAMET guide cg-18:</p><ul><li>General test conditions: stability, environment, location;</li><li>Waiting time, hysteresis effects, loading-unloading;</li><li>Preliminary checks of the instrument;</li><li>Determination of indication errors at different loads;</li><li>Repeatability and eccentricity.</li></ul><p>Complete application of a calibration procedure on a real NAWI:</p><ul><li>Preparation of the device and selection of standard weights;</li><li>Multi-point calibration: increasing, decreasing loads;</li><li>Correction of weighing errors;</li><li>Evaluation of the effect of the weight position on the platform (eccentricity).</li></ul><p>Development of the uncertainty budget associated with the calibration of a NAWI:</p><ul><li>Sources of uncertainty in the calibration of scales: weights, instrument, environmental influences;</li><li>Structure and completion of an uncertainty budget;</li><li>Calculation of combined and extended uncertainty;</li><li>Examples of calculations in Excel.</li></ul><p>Ensuring traceability and compliance of technical documentation:</p><ul><li>Structure and content of a calibration report;</li><li>Metrological traceability requirements;</li><li>Reference equipment tracking and related records;</li><li>Examples of complete calibration reports.</li></ul><p>&nbsp;</p><p>Training of personnel for audits and maintaining accreditation:</p><ul><li>Critical aspects assessed by auditors;</li><li>Process control and method validation;</li><li>Non-conformity management and corrective actions.</li></ul><p>&nbsp;</p><p><strong>Tentative schedule, duration and number of participants is described below.</strong></p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr></tbody></table><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>4 hours theory;</li><li>15 hours laboratory practice;</li><li>11 hours result evaluation and preparation of calibration certificate;</li><li>2 hours practical evaluation of knowledge.</li></ul><p><u>Training at NMI premises</u>:</p><ul><li>4 hours theory;</li><li>16 hours laboratory practice;</li><li>10 hours result evaluation and preparation of calibration certificate;</li><li>2 hours practical evaluation of knowledge.</li></ul><p><strong><u>TASK II- Length Measurements</u></strong><u> </u></p><p>For the topics related to length measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>length measurements </em>as follows:</li></ul><ol><li><strong>Training for handling and calibration of gauge blocks, calipers, micrometers and comparators calibration of rulers and tapes </strong></li></ol><p>A detailed technical composition of the expected training topics is presented further below.</p><ul><li>The Normative documentation in the field with requirements and technical aspects</li><li>Technical and metrology aspects</li><li>Correct handling of instruments (care and maintenance)</li><li>Calibration procedures</li><li>Identification and evaluation of uncertainty factors</li><li>Determining and calculating uncertainty</li><li>Reporting results</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of the NMI&rsquo; clients</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>4 hours theory</li><li>15 hours laboratory practice</li><li>11 hours result evaluation and preparation of calibration certificate</li><li>2 hours practical evaluation of knowledge</li></ul><p>Training at NMI premises:</p><ul><li>4 hours theory</li><li>16 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>2 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Handling and calibration of angle measurements (Theodolite calibration) and <u>handling of Taylor Hobson Roughness Machine</u></strong></p><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Introduction in angle fields</li><li>The Normative documentation in the field with requirements and technical aspects</li><li>Technical and metrology aspects</li><li>Correct handling of instruments (care and maintenance)</li><li>Calibration procedures</li><li>Identification and evaluation of uncertainty factors</li><li>Determining and calculating uncertainty</li><li>Reporting results</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of NMI&rsquo; clients</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>3 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>4 hours theory</li><li>10 hours laboratory practice</li><li>8 hours result evaluation and preparation of calibration certificate</li><li>2 hours practical evaluation of knowledge</li></ul><p>Training at NMI premises:</p><ul><li>4 hours theory</li><li>10 hours laboratory practice</li><li>8 hours result evaluation and preparation of calibration certificate</li><li>2 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>TASK III- Pressure Measurements</u></strong><u> </u></p><p>For the topics related to length measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>pressure measurements </em>as follows:</li></ul><p>&nbsp;</p><ol><li><strong>Advanced training for pressure balances</strong></li></ol><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Cross-floating technology;</li><li>Cross-floating process with zero separator;</li><li>Preparation and maintenance of pressure balances according OIML R 110;</li><li>Selection of medium;</li><li>Theory of piston balances and technical construction;</li><li>Special construction for gas / oil pressure balances;</li><li>Non-rotating piston standards;</li><li>Distortion coefficient that defines the effective area of piston-cylinder assembly;</li><li>Changes of effective area between gauge pressure and absolute pressure.</li></ul><p>Uncertainty analysis and cross-floating techniques.</p><ul><li>Specific issues of pressure balances certificates of calibration;</li><li>Calibration of special construction of pressure balances:&rdquo; negative gauge&rdquo;,&rdquo; free piston construction&rdquo;;</li><li>Support instrumentation for cross-floating technique: filters, sealing systems, fittings;</li></ul><p>Generator of pressure for pressure balances</p><ul><li>Soft for cross-floating techniques, software copy;</li><li>Pressure balance for oxygen, medical device, etc.</li><li>Support in the development of a calibration procedure and adaptation of the normative document to the needs of NMI clients.</li><li>Determination of measurement uncertainty based on calibration certificates</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory</li><li>19 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>3 hours practical evaluation of knowledge</li></ul><p>Training at NMI premises:</p><ul><li>8 hours theory</li><li>16 hours laboratory practice</li><li>12 hours result evaluation and preparation of calibration certificate</li><li>4 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><ol><li><strong>Advanced pressure metrology training (excluding vacuum ranges)</strong></li></ol><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Theory of pressure metrology</li><li>Basical technology used pressure standards</li><li>Physical methods of pressure metrology</li><li>Different techniques for pressure metrology</li><li>Uncertainty analysis of Pressure Metrology</li><li>Basic description of pressure gauges with focus for key parameter for selection of calibration methods</li><li>Pressure generators and supporting</li><li>External equipment: sealings, filters, fittings, valves, maintenance</li><li>Best practices in pressure laboratory</li><li>Recalibration period for pressure standards</li><li>Modification of pressure calibration certificates according use technology</li><li>Practical examples for calibration certificates for all pressure standards</li><li>Report of calibration and budget of uncertainty adapted at NMI-MD laboratory</li><li>Support in obtaining of CMC tables (KCDB)</li><li>Specific calibration method for pressure use for definition for another quantities</li><li>Pressure measurements for leakages in medium protection</li><li>Conversion of pressure units</li></ul><p>Tentative schedule, duration and number of participants to the practical trainings is described below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>4 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>4 hours theory</li><li>16 hours laboratory practice</li><li>10 hours result evaluation and preparation of calibration certificate</li><li>2 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong><u>TASK IV &ndash; Force Measurements</u></strong><u> </u></p><p>For the topics related to mass measurements, the Consultant will have to:</p><ul><li>Develop and submit to the Client training materials.</li><li>Design and deliver theoretical training courses (at NMI premises) and practical trainings (at Consultant&rsquo; premises) in separate courses on <em>force measurements </em>as follows:</li></ul><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Calibration of Tension/compression testing machines and dynamometers according standard ISO 376</strong></li></ol><p>A detailed technical composition of the training topics is presented further below:</p><ul><li>Introduction to Force Metrology, ISO 7500-1 and ISO 376: definitions, traceability, and structure of ISO 376.</li><li>Types of Force Sensors and Dynamometers: tension, compression, and combined types, load cells and mechanical dynamometers</li><li>Classification of Dynamometers According to ISO 376.</li><li>Principles of Calibration According to ISO 376: ascending/descending series, creep, repeatability, reversibility.</li><li>Test Setup and Equipment Requirements: force machines, adapters, alignment systems.</li><li>Environmental and Alignment Considerations: effects of temperature, humidity, and mechanical misalignment.</li><li>Calibration Procedures and Sequence</li><li>Step-by-step execution of calibration cycles</li><li>Considerations for force direction and alignment.</li><li>Evaluation of Results and Data Analysis: deviation, reproducibility, interpolation errors.</li><li>Uncertainty Budget in ISO 376 Calibration - influencing factors and detailed calculation.</li><li>Correction Factors and Uncertainty Reporting.</li><li>Application of correction curves.</li><li>Final calibration certificate structure.</li><li>Practical Examples and drafting of the report and calculations.</li><li>Verification and Recalibration Intervals.</li><li>Maintenance of Dynamometers - mechanical handling, cleaning, and verification.</li><li>Best Practices in Force Calibration Laboratories.</li><li>Adaptation of ISO 376 to National Procedures and Standards.</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>Training at NMI premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>Composition of the training at NMI premises:</p><ul><li>12 hours theory</li><li>16 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>8 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Calibration of Torque Wrenches</strong></li></ol><p>A detailed composition of the training topics is presented further below:</p><ul><li>Introduction to Torque Metrology</li><li>Definition and importance of torque</li><li>Traceability and SI unit</li><li>Applications in industry and quality control</li><li>Overview of Torque Wrenches</li><li>Types: Click, beam, dial, electronic, hydraulic</li><li>Working principles and common use cases</li><li>Key parameters: range, resolution, class</li><li>Fundamentals of Torque Measurement</li><li>Static vs. dynamic torque, focused on statical</li><li>Torque application methods (manual, automated)</li><li>Understanding measurement axis, reaction forces, and parasitic effects</li><li>Torque Standards and Reference Equipment</li><li>Reference transducers and torque calibration systems</li><li>Characteristics of torque testers and torque measurement chains</li><li>International and National Standards for Calibration</li><li>Preparation for Torque Calibration</li><li>Inspection and conditioning of torque tools</li><li>Mounting fixtures and adaptors</li><li>Alignment and mechanical setup</li><li>Calibration Procedures and Sequences</li><li>Application of torque in clockwise/counterclockwise directions</li><li>Loading steps, repeatability, and hysteresis</li><li>Ascending/descending sequences</li><li>Error Sources and Best Practices</li><li>Human influence, angular deflection, friction</li><li>Tool ergonomics and user training</li><li>Uncertainty Budget in Torque Calibration - identification of uncertainty contributors and practical calculation examples</li><li>Calibration Certificate Creation &ndash; soft for calculation and expression of uncertainty and conformity statements, adaptation to NMI-MD conditions.</li><li>Hands-On Calibration Exercises: step-by-step calibration of different torque wrench types, data recording and analysis using software or manual methods.</li><li>Selection and Use of Auxiliary Equipment: adapters, extension bars, sockets, couplings. Maintenance of calibration fixtures and equipment.</li><li>Recalibration Intervals and Tool Maintenance.</li><li>Drafting Calibration Procedures.</li><li>Laboratory Setup and Safety Considerations.</li></ul><p>Tentative schedule, duration and number of participants to the theoretical and practical trainings is described below.</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:293px\"><p><strong>Item</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:151px\"><p><strong>Nr. of participants</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:132px\"><p><strong>Duration</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:293px\"><p>On-site training at Consultant&rsquo; premises</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:151px\"><p>2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:132px\"><p>5 days</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>Composition of <u>on-site practical training at Consultant&rsquo; premises</u>:</p><ul><li>8 hours theory</li><li>20 hours laboratory practice</li><li>4 hours result evaluation and preparation of calibration certificate</li><li>8 hours practical evaluation of knowledge</li></ul><p>&nbsp;</p><p><strong>E.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Details of the assignment</strong></p><p>Theoretical trainings will be provided in Chisinau within NMI&rsquo; facilities. Estimated duration of the all trainings is estimated at 25 days or around 200 academic hours.</p><p>&nbsp;</p><p>Practical training (on-site training) will be provided abroad within the Consultant&rsquo; laboratory. Each on-site training will be structured for 4-5 days /domain.</p><p>&nbsp;</p><p><strong>F.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Common details and requirements for the Consultant&rsquo;s work</strong></p><p>The tasks accomplishment will end at the middle of 2009. The consecutiveness of the task accomplishment is free, at the opinion of the consultant and according the availableness of the trainers and bodies that will be involved in realisation of the project.</p><p><u>Recommended documents, language: </u></p><ul><li>All key theoretical training materials, printed documents including Power-Point applications, will be delivered in English. Each participant will receive hand-outs of the related training material. The training materials and document during the trainings will be available in English.</li><li>The supporting documents should have added value, importance and significance for participants in respect to the objectives described.</li></ul><p><u>The Consultant will have to consider for expenditure estimation <em>inter alia</em> the following items of the costs:</u></p><ul><li>Fees for trainers (training in Moldova plus preparation/reporting at home), daily allowance for staying in Moldova;</li><li>Cost of necessary international and local travel, including transportation of the Personnel of the Consultant by the most appropriate means of transport and the most direct practicable route;</li><li>Cost of applicable international or local communications such as the use of telephone and email required for the purpose of the Services;</li><li>Development presentations and supporting documents in English Printing materials;</li><li>Renting training room (including refreshment);</li><li>Renting technical equipment (data projector, interpretation facilities);</li><li>Organization and logistics etc. at place;</li><li>Fees for laboratory use, if applicable;</li><li>In-country travel costs for Moldovan specialists during the internships (i.e. airport pick-up and drop, etc);</li><li>Development presentations and supporting documents in English (internships)</li></ul><p>&nbsp;</p><p>The Consultant <strong><em>shall be responsible</em></strong> for:</p><ul><li>Carrying out the required assessment at best level;</li><li>Coordination of the progress status with the Ministry of Economic Development and Digitalization (MEDD) and PIU for MSME;</li><li>Producing, for delivery to the MSME PIU and to the Ministry of Economic Development and Digitalization of all specified below deliverables in a timely manner and acceptable quality.</li></ul><p><strong>G.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reports / Deliverable</strong><strong>s</strong></p><p>Within the time frame of this assignment, the Consultant will be expected to develop the following deliverables:</p><ul><li><em>First Progress Report</em>. This paper will comprise <em>inter alia</em> <em>(i)</em> theoretical training programs; <em>(ii)</em> training materials by training topic based on training programs and <em>(iii)</em> description and planning how the practical trainings (internships) will be organized, <em>inter alia</em> agenda for the internship. The report will be submitted within four weeks after commencing the assignment.</li><li><em>Second Progress Report. </em>This paper will include the report on theoretical training sessions delivered by the Consultant to specialists of NMI. The report will be submitted within eight weeks after commencing the assignment.<em> </em></li><li><em>Third Progress Report.</em> This paper will include the report on practical trainings (internships) provided by the Consultant. The report will be submitted within eleven weeks after commencing the assignment.</li><li><em>Final Report</em>. The Final Report is the report comprising all the assignment results. The Report will be submitted within thirteen weeks after commencing the assignment.</li></ul><p>The PIU and the MEDD may provide comments to the deliverables, which should be addressed by the Consultant accordingly.</p><p>&nbsp;</p><p>All Deliverables will be provided in electronic form and in hard copies (if required). The language of the deliverables shall be English and Romanian.</p><p>&nbsp;</p><ol><li><strong>PERIOD and TERMS of the ASSIGNMENT</strong></li></ol><p>The assignment will be implemented in the period from May to July, 2026.</p><p>&nbsp;</p><ol><li><strong>&nbsp;Local Inputs</strong></li></ol><p>The NMI will provide to the Consultant the following available materials and support:</p><ul><li><ul><li>Logistical support relevant to the assignment;</li><li>Information on type and models of the metrology equipment available within the metrology laboratories of the Client.</li></ul></li></ul><p>&nbsp;</p><ol><li><ol><li><ol><li><strong>Requirements for the assignment</strong></li></ol></li></ol></li></ol><p>This assignment will require an EURAMET metrology institute or consortium such metrology institutes with appropriate technical and metrological qualification, comparable standards and internationally recognized knowledge, which:<em> </em></p><ul><li>Has relevant competence in the field of length, mass pressure and force measurements including relevant Calibration and Measurement Capabilities in the Bureau International des Poids et Measures (BIPM) key comparison database.</li></ul><ul><li>Has demonstrated previous experience in providing similar internship and/or trainings in relevant subject fields.</li><li>Has experience in the implementation of the donors&rsquo; and/or IFI&rsquo;s sponsored projects.</li><li>Has experience in preparation of analytical reports, training programs and training curricula.</li></ul><p>&nbsp;</p><p><strong>k.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Terms of payment</strong><strong> </strong></p><p>The Contract will be the Standard World Bank Lump-sum contract.&nbsp;</p><p>&nbsp;</p><p>Tentative payment schedule is provided below:</p><p>&nbsp;</p><ol><li>advance payment, in the amount of 10% of the contract &ndash; within 30 days after signing of the contract.</li><li>2nd payment, in the amount of 25% of the contract - within 30 days after approval of the first progress report.</li><li>3rd payment, in the amount of 25% of the contract - within 30 days after approval of the second progress report.</li><li>4th payment, in the amount of 25% of the contract - within 30 days after approval of the third progress report.</li><li>Final payment, in the amount of 15% of the contract - within 30 days after approval of the final report.</li></ol><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00461047","notice_type":"Request for Expression of Interest","noticedate":"06-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-17T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P515715","project_name":"Advancing Preparation of Uzbekistan Health Sector Reform Program","bid_reference_no":"UZ-MEF-HEALTH-IC-02-CS-INDV","bid_description":"Procurement System Capacity Building","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"1., Niyozbek yo'li street, 100017, Tashkent, Uzbekistan","contact_ctry_name":"Uzbekistan","contact_email":"healthgfpp2@gmail.com","contact_name":"Farhod  Allamuradov","contact_organization":"Ministry of Economy and Finance of the Republic of Uzbekistan","contact_phone_no":"+99897 447-86-11","contact_web_url":"info@imv.uz","submission_date":"2026-08-06T00:00:00Z","notice_text":"<p><strong>Request for Expression of Interest</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Individual Consultant &ndash; Procurement Specialist</strong></p><p><strong>GFPP Preparation Grant No. E6710</strong></p><p><strong>Project Name: Preparation Grant for the Health Sector Reform Program</strong></p><p><strong>Bid Reference: UZ-MEF-HEALTH-IC-02-CS-INDV</strong></p><p><strong>1. Background</strong></p><p>The Ministry of Economy and Finance (MEF) of the Republic of Uzbekistan is implementing the <strong>Grant Facility for Program Preparation (GFPP) IDA Grant No. E6710</strong> financed by the World Bank to support preparation of the proposed Health Sector Reform Program.</p><p>The Grant is intended to finance analytical studies, technical assistance, institutional strengthening, and capacity-building activities required to prepare the follow-on World Bank-financed operation. The activities are expected to support the Government in strengthening primary health care services, improving sector governance and institutional arrangements, and enhancing implementation readiness for the future Program.</p><p>The Project Implementation Unit (PIU) established under the Ministry of Economy and Finance is responsible for overall implementation of the Grant, including procurement, financial management, contract administration, monitoring and evaluation, reporting, environmental and social risk management, and coordination with the World Bank and relevant government institutions.</p><p>Procurement activities under the Grant will primarily consist of the selection and management of consulting firms and individual consultants for technical studies, advisory services, institutional assessments, capacity-building activities, training programs, study visits, and other preparatory activities. A limited number of non-consulting services and operating expenditures will also be procured to support implementation of the Grant.</p><p>Considering the complexity of procurement activities, the number of consulting assignments, and the need to ensure full compliance with the World Bank Procurement Regulations, the PIU intends to engage an experienced <strong>Individual Procurement Specialist</strong> to support implementation of the Grant.</p><p><strong>2. Description of GFPP Grant Activities</strong></p><p>The Grant finances technical assistance and project preparation activities required for the design and preparation of the proposed Health Sector Reform Program.</p><p>The indicative activities include, but are not limited to, the following:</p><p><strong>Component 1 &ndash; Technical Studies and Health Sector Reform Preparation</strong></p><ul><li>Development of methodologies for defining, coding, and costing primary health care services;</li><li>Design and updating of the Guaranteed Benefits Package for primary health care;</li><li>Technical and feasibility studies supporting preparation of the follow-on Program;</li><li>Technical assistance for improving utilization and quality of primary health care services;</li><li>Advisory services related to provider payment mechanisms;</li><li>Advisory support for institutional reforms in the health sector.</li></ul><p><strong>Component 2 &ndash; Institutional Strengthening and Project Readiness</strong></p><ul><li>Capacity building in Environmental and Social Systems Assessment (ESSA);</li><li>Strengthening Monitoring and Evaluation systems;</li><li>Strengthening Financial Management systems;</li><li>Strengthening Procurement systems;</li><li>Institutional capacity development and implementation readiness activities.</li></ul><p><strong>Component 3 &ndash; Capacity Building and Knowledge Exchange</strong></p><ul><li>International study tours;</li><li>Overseas training programs in health economics and health financing;</li><li>Capacity-building programs for government institutions;</li><li>Knowledge-sharing events, workshops, and technical exchanges.</li></ul><p>Implementation of these activities will require procurement of consulting firms, individual consultants, training services, non-consulting services, and other activities in accordance with the <strong>World Bank Procurement Regulations for IPF Borrowers (September 2025)</strong> and the approved Procurement Plan.</p><p><strong>3. Implementation Arrangements</strong></p><p>The Grant will be implemented by the Ministry of Economy and Finance (MEF) through the existing Project Implementation Unit (PIU), which serves as the fiduciary implementing entity responsible for procurement, financial management, contract administration, monitoring and evaluation, reporting, and coordination with the World Bank.</p><p>The PIU shall be responsible for:</p><ul><li>overall implementation and administration of the Grant;</li><li>procurement planning and contract management;</li><li>financial management and disbursement;</li><li>implementation and monitoring of environmental and social commitments;</li><li>monitoring and evaluation of Grant activities;</li><li>preparation of implementation reports;</li><li>coordination with government agencies and development partners;</li><li>communication with the World Bank.</li></ul><p>The Ministry of Health (MOH) will provide technical leadership for a number of activities financed under the Grant. Close coordination between the PIU and the MOH will therefore be essential to ensure timely preparation of technical documentation, procurement decisions, evaluation processes, and implementation of consulting assignments. This coordination arrangement reflects the procurement risks and mitigation measures identified during preparation of the Project Procurement Strategy for Development (PPSD).</p><p>All procurement financed under the Grant shall be carried out in accordance with the <strong>World Bank Procurement Regulations for IPF Borrowers (September 2025)</strong>, the Grant Agreement, the applicable Procurement Plan, and the Disbursement and Financial Information Letter (DFIL).</p><p><strong>4. Objective of the Assignment</strong></p><p>The objective of the assignment is to provide professional procurement support to the Project Implementation Unit under the Ministry of Economy and Finance to ensure that all procurement activities financed under the GFPP Grant are planned, implemented, and administered in a timely, efficient, transparent, and fully compliant manner in accordance with the World Bank Procurement Regulations, the Grant Agreement, the Procurement Plan, the DFIL, and applicable national legislation where appropriate.</p><p>The Procurement Specialist shall contribute to timely implementation of procurement activities, effective contract management, mitigation of procurement risks, and achievement of the Grant objectives.</p><p>In addition to supporting implementation of the GFPP Grant, the Procurement Specialist may, upon request of the PIU Manager, provide procurement support to other projects implemented by the same PIU, provided that such support does not adversely affect implementation of the Grant.</p><p><strong>5. Scope of Services</strong></p><p>The Procurement Specialist shall be responsible for planning, coordinating, implementing, and monitoring procurement activities under the Grant throughout the procurement cycle in accordance with the World Bank Procurement Regulations for IPF Borrowers (September 2025), the approved Procurement Plan, the Grant Agreement, and other applicable World Bank requirements.</p><p>The Consultant shall perform, but not necessarily be limited to, the following tasks:</p><p><strong>A. Procurement Planning</strong></p><p>The Consultant shall:</p><ul><li>Prepare, maintain, and periodically update the Project Procurement Plan in the World Bank&#39;s Systematic Tracking of Exchanges in Procurement (STEP).</li><li>Review procurement requirements in consultation with the PIU Manager, technical specialists, the Ministry of Health, and other relevant stakeholders.</li><li>Prepare and update the Project Procurement Strategy for Development (PPSD), where required.</li><li>Develop realistic procurement schedules and monitor procurement milestones to ensure timely implementation of Grant activities.</li><li>Prepare procurement-related sections of the Project Operations Manual (POM) and update them, as necessary.</li><li>Monitor implementation of the Procurement Plan and recommend corrective actions where delays or implementation risks are identified.</li></ul><p><strong>B. Procurement Risk Management</strong></p><p>The Consultant shall:</p><ul><li>Identify procurement-related risks and recommend appropriate mitigation measures.</li><li>Monitor implementation risks affecting procurement timelines and advise the PIU Manager on corrective actions.</li><li>Ensure that procurement approaches are consistent with the market conditions, procurement risks, and procurement methods identified in the PPSD.</li><li>Coordinate closely with technical specialists to ensure that Terms of Reference, technical specifications, cost estimates, and evaluation criteria are complete, clear, and fit for purpose.</li><li>Promote integrity, transparency, fairness, and accountability throughout procurement processes.</li><li>Ensure that procurement complaints are managed in accordance with the applicable provisions of the World Bank Procurement Regulations.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>C. Preparation and Administration of Procurement Processes</strong></p><p>The Consultant shall:</p><ul><li>Prepare procurement documents for consulting services, individual consultants, non-consulting services, and goods financed under the Grant.</li><li>Prepare Requests for Expressions of Interest (REOI), Requests for Quotations (RFQ), Requests for Proposals (RFP), Requests for Bids (RFB), bidding documents, evaluation forms, procurement notices, draft contracts, and other procurement documentation.</li><li>Ensure that procurement documents comply with the World Bank Procurement Regulations, Standard Procurement Documents (SPDs), and applicable procurement methods.</li><li>Coordinate publication of procurement notices through STEP and other required national or international media.</li><li>Obtain all required internal approvals and World Bank clearances before launching procurement activities.</li><li>Coordinate multiple procurement processes simultaneously to support timely implementation of the Grant.</li></ul><p><strong>D. Evaluation and Contract Award</strong></p><p>The Consultant shall:</p><ul><li>Organize and provide procedural support to evaluation committees.</li><li>Ensure confidentiality, transparency, consistency, and fairness throughout the evaluation process.</li><li>Provide guidance to evaluation committee members on the application of the World Bank Procurement Regulations.</li><li>Prepare technical, financial, and combined evaluation reports for procurement of consulting services, goods, and non-consulting services.</li><li>Submit procurement documentation through STEP for the World Bank&#39;s review and no-objection, where required.</li><li>Prepare draft contracts and assist the PIU in contract negotiations, where applicable.</li><li>Coordinate contract award procedures and publication of contract award information in accordance with applicable requirements.</li></ul><p><strong>E. Contract Administration</strong></p><p>The Consultant shall:</p><ul><li>Maintain comprehensive procurement and contract management records throughout contract implementation.</li><li>Monitor consultants&#39; and contractors&#39; compliance with contractual obligations, deliverables, milestones, and implementation schedules.</li><li>Coordinate with technical specialists to ensure timely review, acceptance, and approval of consultants&#39; deliverables.</li><li>Prepare procurement-related contract amendments, variations, extensions, and completion documentation.</li><li>Identify procurement- and contract-related issues and recommend appropriate corrective measures.</li><li>Ensure that consulting assignments incorporate agreed knowledge-transfer and capacity-building activities, where applicable, in accordance with the objectives of the Grant.</li></ul><p><strong>F. Compliance and Fiduciary Support</strong></p><p>The Consultant shall ensure that procurement activities are carried out in full compliance with:</p><ul><li>the World Bank Procurement Regulations for IPF Borrowers (September 2025);</li><li>the World Bank Anti-Corruption Guidelines;</li><li>the Grant Agreement;</li><li>the Disbursement and Financial Information Letter (DFIL);</li><li>the approved Procurement Plan;</li><li>applicable national legislation, where relevant.</li></ul><p>The Consultant shall also:</p><ul><li>maintain complete procurement documentation suitable for prior review, post review, audit, and project supervision;</li><li>ensure proper procurement filing in both electronic and hard-copy formats;</li><li>support implementation support missions, procurement reviews, post reviews, and external audits by providing procurement documentation and explanations as required.</li></ul><p><strong>G. STEP Administration</strong></p><p>The Consultant shall:</p><ul><li>Maintain all procurement activities in the World Bank STEP system.</li><li>Upload procurement plans, procurement documents, evaluation reports, contracts, amendments, procurement notices, and other procurement records into STEP.</li><li>Monitor procurement milestones and ensure timely submission of documents for the World Bank&#39;s review.</li><li>Respond promptly to comments and requests received from the World Bank through STEP.</li><li>Utilize AI-assisted functionality available within the STEP system, where appropriate, to support preparation of procurement documents, draft Terms of Reference, evaluation reports, and other procurement documentation. All AI-generated outputs shall be carefully reviewed, validated, and finalized by the Consultant prior to submission or use.</li></ul><p><strong>H. Coordination and Reporting</strong></p><p>The Consultant shall:</p><ul><li>Coordinate procurement activities with the PIU Manager, Financial Management Specialist, technical consultants, the Ministry of Health, relevant MEF departments, and the World Bank.</li><li>Prepare procurement progress reports and procurement status updates requested by the PIU Manager or the World Bank.</li><li>Prepare procurement inputs for implementation support missions, project progress reports, aide-m&eacute;moires, and other project documentation.</li><li>Provide procurement advice and guidance to PIU staff, technical specialists, and evaluation committee members.</li><li>Participate in meetings, workshops, and missions related to implementation of the Grant, as required.</li></ul><p><strong>I. Other Responsibilities</strong></p><p>The Consultant shall:</p><ul><li>Provide procurement support, as requested by the PIU Manager, to other projects implemented by the PIU under the Ministry of Economy and Finance, provided that such support does not adversely affect implementation of the GFPP Grant.</li><li>Contribute to strengthening procurement capacity within the PIU through on-the-job knowledge sharing and mentoring.</li><li>Perform any other procurement-related duties reasonably assigned by the PIU Manager that are relevant to successful implementation of projects administered by the PIU.</li></ul><p><strong>6. Deliverables</strong></p><p>The Procurement Specialist shall provide, at a minimum, the following deliverables throughout the implementation of the Grant:</p><ol><li>Procurement Plan prepared, maintained, and regularly updated in the World Bank STEP system.</li><li>Procurement documents for all assigned procurement activities, including Requests for Expressions of Interest (REOI), Requests for Quotations (RFQ), Requests for Proposals (RFP), Requests for Bids (RFB), bidding documents, draft contracts, procurement notices, and other related documentation.</li><li>Procurement evaluation reports prepared and submitted for the PIU&#39;s and the World Bank&#39;s review, as applicable.</li><li>Procurement records maintained in accordance with the World Bank Procurement Regulations, including complete documentation for prior review, post review, and audit purposes.</li><li>Procurement-related contract documentation, including draft contracts, amendments, variations, extensions, and contract completion records.</li><li>Procurement progress reports and status updates, including inputs to implementation progress reports, implementation support missions, aide-m&eacute;moires, and other reports requested by the PIU Manager or the World Bank.</li><li>Procurement activities and documentation accurately maintained and updated in the STEP system throughout the implementation period.</li><li>Procurement-related inputs to the Project Operations Manual (POM) and other project implementation documents, as required.</li><li>Procurement advice and on-the-job support provided to the PIU and relevant stakeholders throughout project implementation.</li></ol><p>All deliverables shall be prepared in a form and substance satisfactory to the PIU Manager and, where applicable, acceptable to the World Bank.</p><p><strong>7. Qualifications</strong></p><p><strong>Education</strong></p><p>The Consultant shall possess:</p><ul><li>A Master&#39;s degree or equivalent in Procurement, Public Administration, Economics, Finance, Business Administration, Law, Engineering, or another relevant discipline.</li><li>Professional certification or specialized training in public procurement, contract management, or supply chain management would be considered an advantage.</li></ul><p><strong>Professional Experience</strong></p><p>The Consultant shall have:</p><ul><li>At least <strong>five (5) years</strong> of progressively responsible professional experience in procurement.</li><li>Demonstrated experience in procurement under projects financed by Multilateral Development Banks (MDBs), preferably the World Bank.</li><li>Proven experience in procurement of consulting services, individual consultants, goods, and non-consulting services.</li><li>Practical experience using the World Bank&#39;s <strong>Systematic Tracking of Exchanges in Procurement (STEP)</strong> platform is highly desirable.</li><li>Experience in preparation of procurement strategies, procurement plans, procurement documents, evaluation reports, and contract administration.</li><li>Experience working with public sector institutions in Uzbekistan would be considered an asset.</li><li>Demonstrated experience in procurement of technical assistance, analytical studies, institutional strengthening, and capacity-building assignments financed by development partners would be an advantage.</li></ul><p><strong>Competencies</strong></p><p>The Consultant shall demonstrate:</p><ul><li>Thorough knowledge of the <strong>World Bank Procurement Regulations for IPF Borrowers</strong>.</li><li>Good understanding of international procurement best practices.</li><li>Strong analytical, organizational, and problem-solving skills.</li><li>Excellent communication, coordination, and interpersonal skills.</li><li>Ability to manage multiple procurement processes simultaneously while meeting tight deadlines.</li><li>High standards of integrity, professionalism, impartiality, and confidentiality.</li><li>Proficiency in Microsoft Office applications.</li><li>Ability to effectively utilize digital procurement platforms and AI-assisted functionality, where appropriate, while ensuring professional review and validation of all outputs.</li></ul><p><strong>Languages</strong></p><ul><li>Fluency in written and spoken <strong>Uzbek or Russian</strong>.</li><li>Good working knowledge of <strong>English</strong>, both written and spoken.</li></ul><p>&nbsp;</p><p><strong>8. Duration of the Assignment</strong></p><p>The assignment is expected to commence upon contract signature and shall continue throughout the implementation period of the <strong>Grant Facility for Program Preparation (GFPP) GFPP IDA Grant No. E6710</strong>, currently expected through <strong>30 June 2027</strong>.</p><p>The Consultant shall be engaged as an <strong>Individual Consultant</strong> in accordance with the <strong>World Bank Procurement Regulations for IPF Borrowers (September 2025)</strong>.</p><p><strong>9. Reporting and Supervision</strong></p><p>The Procurement Specialist shall report directly to the <strong>PIU Manager</strong> of the Project Implementation Unit under the Ministry of Economy and Finance.</p><p>The Consultant shall work in close coordination with:</p><ul><li>the PIU Manager;</li><li>the Financial Management Specialist;</li><li>technical specialists and consultants engaged under the Grant;</li><li>relevant departments of the Ministry of Economy and Finance;</li><li>the Ministry of Health and other participating government institutions, as required;</li><li>the World Bank Procurement Specialist(s) and Task Team.</li></ul><p>The Procurement Specialist shall perform the assignment under the overall supervision of the PIU Manager and in accordance with the provisions of the Grant Agreement, the World Bank Procurement Regulations for IPF Borrowers, the approved Procurement Plan, and other applicable World Bank policies and procedures.</p><p>The Consultant shall maintain regular communication with the PIU Manager regarding implementation progress, procurement risks, procurement planning, and contract administration issues, and shall promptly bring to the attention of the PIU Manager any matter that may affect timely implementation of the Grant or compliance with the applicable procurement requirements.</p><p><strong>10. Confidentiality and Conflict of Interest</strong></p><p>The Consultant shall perform the assignment with the highest standards of professional and ethical competence and integrity.</p><p>The Consultant shall maintain the confidentiality of all information obtained during the assignment and shall not disclose such information to any third party without prior written authorization from the PIU Manager, except where disclosure is required by applicable laws or the World Bank.</p><p>The Consultant shall avoid any actual, potential, or perceived conflict of interest throughout the duration of the assignment and shall immediately disclose to the PIU Manager any circumstances that may give rise to such conflict.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form in English or Russian languages to the address below&nbsp;(in person, or by mail, or by e-mail)&nbsp;by August 17, 2026, at 18:00 hours Tashkent time.</p><p><strong>Uzbekistan, 100017, Tashkent, Niyozbek yo&#39;li, 1</strong></p><p><strong>Tel:(+99897) 447-86-11</strong></p><p><strong>E-mail: healthgfpp2@gmail.com</strong></p><p><strong>Web site: https://www.imv.uz/</strong></p><p><strong>Abdurashid Abdurakhmanov</strong></p>"},{"id":"OP00460398","notice_type":"Request for Expression of Interest","noticedate":"04-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-14T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P515715","project_name":"Advancing Preparation of Uzbekistan Health Sector Reform Program","bid_reference_no":"UZ-MEF-HEALTH-IC-01-CS-INDV","bid_description":"Health Technical Coordinator for the Health Sector Reform Program","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"1., Niyozbek yo'li street, 100017, Tashkent","contact_ctry_name":"Uzbekistan","contact_email":"allamuradov.farhod@gmail.com","contact_name":"Farhod  Allamuradov","contact_organization":"Ministry of Economy and Finance of the Republic of Uzbekistan","contact_phone_no":"+998974478611","contact_web_url":"info@imv.uz","submission_date":"2026-08-04T00:00:00Z","notice_text":"<p><strong>Request for Expression of Interest</strong></p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>Individual Consultant &ndash; Health Technical Coordinator</strong></p><p><strong>GFPP Preparation Grant No. E6710</strong></p><p><strong>Project Name: Preparation Grant for the Health Sector Reform Program</strong></p><p><strong>Bid Reference: UZ-MEF-HEALTH-IC-01-CS-INDV</strong></p><p><strong>1. Background</strong></p><p>The Ministry of Economy and Finance (MEF) of the Republic of Uzbekistan is implementing the <strong>Grant Facility for Program Preparation (GFPP) IDA Grant No. E6710</strong>, financed by the World Bank, to support the preparation of the proposed Health Sector Reform Program.</p><p>The objective of the Grant is to finance technical assistance, analytical work, institutional strengthening, and project preparation activities required for the design of the future World Bank-financed Health Sector Reform Program. The Grant supports the Government of Uzbekistan in preparing key technical, institutional, fiduciary, environmental and social, and implementation arrangements necessary for the proposed operation.</p><p>The Project Implementation Unit (PIU), established under the Ministry of Economy and Finance, is responsible for overall implementation of the Grant, including procurement, financial management, contract administration, monitoring and evaluation, reporting, coordination with the World Bank, and overall fiduciary oversight.</p><p>Implementation of the Grant requires close collaboration between the Ministry of Economy and Finance, the Ministry of Health, technical consultants, other government institutions, and the World Bank. The Ministry of Health serves as the principal technical counterpart for the preparation of the future Health Sector Reform Program and provides technical leadership for a number of Grant activities.</p><p>To strengthen the PIU&#39;s technical capacity and facilitate effective implementation of technical activities financed under the Grant, the PIU intends to engage an experienced <strong>Health Technical Coordinator</strong> as an Individual Consultant.</p><p><strong>2. Description of GFPP Grant Activities</strong></p><p>The Grant finances technical assistance and project preparation activities required for the preparation of the proposed Health Sector Reform Program.</p><p>Indicative activities financed under the Grant include, but are not limited to:</p><p><strong>Component 1. Technical Studies and Health Sector Reform Preparation</strong></p><ul><li>technical and analytical studies supporting health sector reforms;</li><li>development of methodologies and technical approaches for primary health care services;</li><li>preparation of policy recommendations for strengthening health financing and service delivery;</li><li>technical assistance related to provider payment mechanisms and the Guaranteed Benefits Package;</li><li>institutional and sector assessments;</li><li>feasibility and analytical studies required for preparation of the future Program.</li></ul><p><strong>Component 2. Institutional Strengthening and Project Readiness</strong></p><ul><li>strengthening institutional capacity of participating agencies;</li><li>environmental and social assessments and implementation readiness;</li><li>strengthening monitoring and evaluation systems;</li><li>strengthening fiduciary systems, including procurement and financial management;</li><li>preparation of implementation arrangements for the proposed Program.</li></ul><p><strong>Component 3. Capacity Building and Knowledge Exchange</strong></p><ul><li>organization of technical workshops;</li><li>international study visits;</li><li>overseas training programs;</li><li>knowledge exchange activities;</li><li>dissemination of international good practices relevant to health sector reforms.</li></ul><p>Implementation of these activities requires effective coordination among government agencies, consultants, and development partners to ensure timely delivery of technical outputs and successful preparation of the future Program.</p><p><strong>3. Implementation Arrangements</strong></p><p>The Grant will be implemented by the Ministry of Economy and Finance through the existing Project Implementation Unit (PIU), which is responsible for fiduciary management, procurement, financial management, contract administration, monitoring and evaluation, reporting, and coordination with the World Bank.</p><p>The Ministry of Health will provide technical leadership and guidance for technical activities financed under the Grant. Various national and international consultants and consulting firms will be engaged to carry out analytical studies, technical assessments, institutional reviews, and capacity-building activities.</p><p>The Health Technical Coordinator shall work under the overall supervision of the <strong>PIU Manager</strong> and shall provide technical support to the PIU in coordinating health-related activities financed under the Grant. The Consultant shall work closely with representatives of the Ministry of Health, consultants engaged under the Grant, other government agencies, and the World Bank Task Team.</p><p>The Consultant shall provide technical advice and support to facilitate timely implementation of consulting assignments, preparation and review of technical documentation, monitoring of implementation progress, and communication between technical stakeholders.</p><p><strong>4. Objective of the Assignment</strong></p><p>The objective of the assignment is to provide professional health sector technical support to the Project Implementation Unit under the Ministry of Economy and Finance in implementing activities financed under the <strong>GFPP IDA Grant No. E6710</strong>.</p><p>The Consultant shall support the PIU Manager in coordinating technical aspects of Grant implementation, facilitate communication with the Ministry of Health and other stakeholders, assist in the preparation and review of technical documentation, monitor implementation of consulting assignments from a technical perspective, and contribute to timely achievement of the Grant objectives.</p><p>The Consultant shall provide technical support throughout the implementation cycle of Grant activities while ensuring effective collaboration among technical stakeholders and consistency of technical outputs with the objectives of the Grant.</p><p>Upon request of the PIU Manager, the Consultant may also provide technical support to other health sector projects implemented by the PIU, provided that such support does not adversely affect implementation of the GFPP Grant.</p><p><strong>5. Scope of Services</strong></p><p>The Health Technical Coordinator shall work under the overall supervision of the PIU Manager and provide technical support to the PIU throughout implementation of the GFPP IDA Grant No. E6710. The Consultant shall support the preparation, implementation, monitoring, and technical oversight of Grant activities and contribute to effective coordination among the Ministry of Economy and Finance, the Ministry of Health, consultants, and the World Bank.</p><p>The Consultant shall perform, but not necessarily be limited to, the following tasks:</p><p><strong>A. Technical Support for Project Implementation</strong></p><p>The Consultant shall:</p><ul><li>provide technical advice to the PIU Manager on health sector matters related to implementation of the Grant;</li><li>support implementation of technical activities financed under the Grant;</li><li>assist in preparation and periodic updating of technical implementation schedules and work plans;</li><li>identify technical implementation risks and propose appropriate mitigation measures;</li><li>monitor implementation progress of technical activities and advise the PIU Manager on issues affecting timely delivery of outputs;</li><li>contribute to ensuring consistency of technical outputs with the objectives of the Grant and the proposed Health Sector Reform Program.</li></ul><p><strong>B. Technical Support to Procurement Activities</strong></p><p>The Consultant shall:</p><ul><li>prepare and review Terms of Reference (ToRs) for consulting assignments;</li><li>assist technical departments in defining the scope of consulting services and expected outputs;</li><li>support preparation of technical specifications and technical requirements for procurement packages;</li><li>review procurement documentation from the technical perspective before submission for procurement processing;</li><li>participate, when requested, as a technical member of consultant evaluation committees;</li><li>review consultants&rsquo; technical proposals and provide technical comments during evaluation;</li><li>provide technical clarification during procurement processes, when required;</li><li>utilize AI-assisted functionality available within the World Bank STEP system, where appropriate, to support preparation of draft Terms of Reference and other technical documentation, ensuring that all outputs are professionally reviewed and validated prior to submission.</li></ul><p><strong>C. Technical Review of Consultant Deliverables</strong></p><p>The Consultant shall:</p><ul><li>review inception reports, interim reports, draft reports, and final reports prepared by consultants;</li><li>assess whether consultants&rsquo; outputs are technically sound, complete, and consistent with the approved Terms of Reference;</li><li>prepare technical comments and recommendations for the PIU Manager;</li><li>coordinate collection and consolidation of comments received from the Ministry of Health and other stakeholders;</li><li>support timely review and acceptance of consultants&rsquo; deliverables;</li><li>monitor implementation of consultants&rsquo; recommendations, where applicable.</li></ul><p><strong>D. Coordination with the Ministry of Health and Stakeholders</strong></p><p>The Consultant shall:</p><ul><li>maintain regular technical communication with the Ministry of Health and other participating government institutions;</li><li>facilitate exchange of technical information between consultants, the PIU, and government counterparts;</li><li>support organization of technical meetings, consultations, workshops, and working group sessions;</li><li>prepare technical briefing notes, presentations, agendas, minutes of meetings, and follow-up action matrices;</li><li>monitor implementation of agreed technical actions arising from meetings and consultations.</li></ul><p><strong>E. Monitoring, Evaluation, and Reporting</strong></p><p>The Consultant shall:</p><ul><li>support monitoring of implementation progress of technical activities financed under the Grant;</li><li>contribute to monitoring achievement of project indicators and technical milestones;</li><li>assist in identifying implementation bottlenecks and recommend corrective actions;</li><li>prepare monthly technical progress updates for the PIU Manager;</li><li>prepare technical inputs to quarterly, semi-annual, and annual project progress reports;</li><li>contribute to preparation of implementation reports, aide-m&eacute;moires, and other project documentation requested by the World Bank.</li></ul><p><strong>F. Capacity Building and Knowledge Sharing</strong></p><p>The Consultant shall:</p><ul><li>support preparation and implementation of workshops, training activities, study visits, and technical exchanges financed under the Grant;</li><li>facilitate coordination with national and international experts participating in capacity-building activities;</li><li>assist in dissemination of technical knowledge and lessons learned generated under the Grant;</li><li>contribute to strengthening institutional capacity of participating agencies through technical advice and knowledge sharing.</li></ul><p><strong>G. Other Responsibilities</strong></p><p>The Consultant shall:</p><ul><li>undertake field visits, when required, to support implementation and monitor technical activities;</li><li>provide technical advice to the PIU on health sector matters relevant to implementation of the Grant;</li><li>support preparation of technical sections of project documentation, reports, and presentations;</li><li>provide technical support, as requested by the PIU Manager, to other health sector projects implemented by the PIU, provided that such support does not adversely affect implementation of the GFPP IDA Grant No. E6710;</li><li>perform any other health sector-related duties reasonably assigned by the PIU Manager that are relevant to successful implementation of projects administered by the PIU.</li></ul><p><strong>6. Deliverables</strong></p><p>The Health Technical Coordinator shall provide, at a minimum, the following deliverables throughout the implementation period of the Grant:</p><ol><li>Technical inputs to&nbsp; work plans, implementation schedules, and activity plans for Grant implementation.</li><li>Draft and finalized Terms of Reference (ToRs), technical specifications, and other technical documentation prepared or reviewed in support of procurement activities.</li><li>Technical reviews and written comments on consultants&#39; inception reports, interim reports, draft reports, final reports, and other technical deliverables.</li><li>Monthly technical progress reports summarizing implementation status, key achievements, issues encountered, and recommended corrective actions.</li><li>Technical inputs to quarterly, semi-annual, and annual project implementation reports, implementation support missions, aide-m&eacute;moires, and other reports requested by the PIU Manager</li><li>Technical briefing materials, presentations, meeting agendas, minutes of meetings, and follow-up action matrices prepared for meetings with the Ministry of Health, the World Bank, and other stakeholders.</li><li>Technical reports and recommendations resulting from field visits, consultations, workshops, study tours, and other Grant activities, where applicable.</li><li>Technical recommendations supporting implementation of consulting assignments, monitoring of deliverables, and resolution of technical issues arising during implementation.</li><li>Technical support provided for knowledge-sharing events, workshops, training activities, and capacity-building initiatives financed under the Grant.</li></ol><p>All deliverables shall be prepared in a form and substance satisfactory to the PIU Manager and, where applicable, acceptable to the World Bank.</p><p><strong>7. Qualifications</strong></p><p><strong>Education</strong></p><p>The Consultant shall possess:</p><ul><li>a Master&#39;s degree or higher in Public Health, Medicine, Health Policy, Health Management, Health Economics, Public Administration, or another relevant discipline.</li></ul><p><strong>Professional Experience</strong></p><p>The Consultant shall have:</p><ul><li>at least <strong>seven (7) years</strong> of progressively responsible professional experience in the health sector;</li><li>demonstrated experience in health sector reforms, health systems strengthening, public health policy, health financing, or health service delivery;</li><li>experience in implementation of technical assistance projects financed by international development partners; experience with World Bank-financed projects is highly desirable;</li><li>experience in preparation and review of Terms of Reference, technical reports, analytical studies, and consultant deliverables;</li><li>experience working with government institutions and coordinating with multiple stakeholders;</li><li>experience in organization of technical meetings, workshops, consultations, training activities, and study visits.</li></ul><p><strong>Competencies</strong></p><p>The Consultant shall demonstrate:</p><ul><li>sound knowledge of health sector policies, institutional reforms, and health system governance in Uzbekistan context;</li><li>strong analytical, coordination, facilitation, and communication skills;</li><li>excellent report-writing and presentation skills;</li><li>ability to review complex technical documents and provide constructive recommendations;</li><li>ability to manage multiple assignments simultaneously while meeting tight deadlines;</li><li>high standards of integrity, professionalism, confidentiality, and ethical conduct;</li><li>proficiency in Microsoft Office applications;</li><li>ability to effectively utilize digital collaboration tools and AI-assisted drafting tools while ensuring professional review and validation of all outputs.</li></ul><p><strong>Languages</strong></p><p>The Consultant shall possess:</p><ul><li>fluency in written and spoken <strong>Uzbek or Russian</strong>;</li><li>good working knowledge of <strong>English</strong>, both written and spoken.</li></ul><p><strong>8. Duration of the Assignment</strong></p><p>The Consultant shall be engaged as an <strong>Individual Consultant</strong> for the implementation period of the <strong>GFPP IDA Grant No. E6710</strong>.</p><p><strong>9. Reporting and Supervision</strong></p><p>The Health Technical Coordinator shall report directly to the <strong>PIU Manager</strong>.</p><p>The Consultant shall work in close coordination with:</p><ul><li>the Procurement Specialist;</li><li>the Financial Management Specialist;</li><li>Environmental and Social Specialists;</li><li>consultants and consulting firms engaged under the Grant;</li><li>representatives of the Ministry of Health;</li><li>relevant departments of the Ministry of Economy and Finance;</li><li>other participating government institutions;</li><li>&nbsp;</li></ul><p>The Consultant shall perform the assignment under the overall supervision of the PIU Manager and in accordance with the Financing Agreement.</p><p>The Consultant shall provide technical advice and support to the PIU Manager and shall not perform managerial, fiduciary, procurement, or financial management functions assigned to other members of the PIU.</p><p>The Consultant shall promptly inform the PIU Manager of any technical issues, implementation risks, or delays that may affect achievement of the Grant objectives and shall recommend appropriate mitigation measures.</p><p><strong>10. Confidentiality and Conflict of Interest</strong></p><p>The Consultant shall perform the assignment with the highest standards of professional competence, integrity, and ethical conduct.</p><p>The Consultant shall maintain strict confidentiality of all information obtained during the assignment and shall not disclose such information to any third party without prior written authorization from the PIU Manager, except where disclosure is required by applicable legislation or the requirements of the World Bank.</p><p>The Consultant shall avoid any actual, potential, or perceived conflict of interest throughout the duration of the assignment and shall immediately disclose to the PIU Manager any circumstances that may give rise to such conflict.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form in English or Russian languages to the address below&nbsp;(in person, or by mail, or by e-mail)&nbsp;by August 14, 2026, at 18:00 hours Tashkent time.</p><p><strong>Uzbekistan, 100017, Tashkent, Niyozbek yo&#39;li, 1</strong></p><p><strong>Tel:(+99897) 447-86-11</strong></p><p><strong>E-mail: healthgfpp2@gmail.com</strong></p><p><strong>Web site: https://www.imv.uz/</strong></p><p><strong>Abdurashid Abdurakhmanov</strong></p>"},{"id":"OP00460465","notice_type":"Request for Expression of Interest","noticedate":"04-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-14T00:00:00Z","submission_deadline_time":"12:30","project_ctry_name":"Gambia, The","project_id":"P179233","project_name":"The Gambia Resilience, Inclusion, Skills, and Equity Project","bid_reference_no":"GM-CPCU - MOFEA-556550-CS-INDV","bid_description":"Consultancy to develop the National Nutrition Regulation and Guideline for NaNA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ministry of Finance and Economic Affairs","contact_ctry_name":"Gambia, The","contact_email":"ataal@cpcumof.gm","contact_name":"Ndey Anta Taal","contact_organization":"Central Project Coordinating Unit","contact_phone_no":"7004971","submission_date":"2026-08-04T00:00:00Z","notice_text":"<p><strong>Request for Expressions of Interest</strong></p><p>&nbsp;</p><p><strong>Country: </strong>The Republic of the Gambia</p><p><strong>Project Title: </strong>The Gambia Resilience, Inclusion, Skills and Equity Project RISE</p><p><strong>Grant Number: </strong>P1729233</p><p><strong>Assignment Title: </strong>Consultancy to develop the National Nutrition Regulation and Guideline for NaNA</p><p><strong>Procurement Method: </strong>Individual Consultant Selection (INDV)</p><p><strong>Reference No.: GM-CPCU - MOFEA-556550-CS-INDV</strong></p><p>&nbsp;</p><p>Background:</p><p>The Gambia is a small country with a total area of about 10,690 square kilometers.&nbsp; It is surrounded on all sides by the Republic of Senegal, except in the West by the Atlantic Ocean. The population is estimated 2.42 million with a high population growth rate of 3.1 percent per year (Census, 2024). The 2017 Human Development Index shows the country rank at 174 out of 189 countries. Efforts to fight poverty have also proven ineffective with poverty levels remaining unchanged in the past decade (the percentage of households living below the poverty line of 1.25 $/day is 48.65 per cent in 2015 (HIS 2015/2016). The average GDP growth of 3 per cent per annum has barely kept up with population growth of 3.1 per cent. Data from the 2019/20 Demographic Health Survey (DHS) showed encouraging results for U5MR having dropped to 34 per 1,000 down from&nbsp; 54 per 1,000 live births in 2013, Maternal Mortality Ratio estimated 189/100,000 down from at 433/100000 live births in 2013.</p><p>&nbsp;</p><p>Micronutrient deficiencies are widespread and continue to pose serious public health risks. Anaemia affects 44.8% of children, and only 10.8% of households consume adequately iodized salt even though 77% do consume iodized salt. Vitamin A deficiency affects 18.3% of children under five (MICS 2018). These figures highlight the urgency of interventions such as supplementation, iodization, fortification, and biofortification, supported by regulatory frameworks like the Food Fortification Regulation (2020). Despite these efforts, gaps in coverage and compliance persist, particularly in rural and underserved communities. Strengthening supply chains, enforcement mechanisms, and public awareness campaigns will be essential to improving micronutrient outcomes.</p><p>&nbsp;</p><p>Infant and young child feeding practices show mixed progress. While 98% of children are breastfed, only 36% of mothers initiate breastfeeding within one hour of birth and 53.6% of children are exclusively breastfed. Complementary feeding remains inadequate, with just 15% of children receiving a minimum acceptable diet. The prevalence of malnutrition has improved with the DHS 2019/20 estimating stunting at 17.5% from 25% in 2013, wasting 5.1% from 12% and underweight 11.6% from 16%. These indicators reflect broader food and nutrition security challenges. The country produces only 50% of its food needs and over half the population (60.2%) do not have enough to meet their food expenditure, according to the Integrated Household Survey (IHS 2022). Climate change, low agricultural productivity, and population growth exacerbate these conditions, prompting national strategies focused on climate-smart agriculture, diversified and increased local food promotion and integration of nutrition into broader development efforts.</p><p>&nbsp;</p><p>Non-communicable Diseases (NCDs) are on the rise, driven by poor diets, sedentary lifestyles, and urbanization. Hypertension affects 47% of adults, and obesity is significantly higher among women (20.2%) compared to men (3.9%) (WHO STEPS Survey 2019). Only 6.6% of the population meets WHO physical activity guidelines, reflecting lifestyle shifts associated with urbanization, poor dietary habits and sedentary lifestyles. The Fill the Nutrient Gap analysis 2025 shows that only 29% can afford a healthy diet. National responses focus on prevention by adopting appropriate dietary guidelines and lifestyles through social and behaviour change communication, and multisectoral collaboration. However, implementation remains fragmented, and greater investment in community-based prevention and promotion of healthy behaviours is needed.</p><p>&nbsp;</p><p>As a cross cutting issue, the improvement and implementation of nutrition interventions and programme requires a strong coordination mechanism to avoid duplication and gaps. The National Nutrition Agency (NaNA) was established in 2000 as a semi-autonomous government institution strategically placed under the Office of The Vice President through an Agency Board with the legal mandate to coordinate nutrition and nutrition-related activities and advocate for the mainstreaming of nutrition into the macroeconomic and sectoral policy frameworks, implement nutrition activities, monitor nutrition interventions and programmes, mobilize and manage resources in The Gambia.</p><p>&nbsp;</p><p>The Agency became a legal entity in 2005 through an Act of the National Assembly (Food Act 2005) which is now repealed and replaced by the Nutrition Act 2024. This ensures effective coordination of nutrition interventions across sectors. The Agency serves as the Secretariat to the National Nutrition Council (an inter-Ministerial body chaired by the Vice President), the country Scaling Up of Nutrition (SUN) Movement and the National Alliance for Food Fortification (NAFF).</p><p>&nbsp;</p><p>The Agency was charged with the overall coordination and implementation of the policy with the following core mandates:</p><ol><li>Coordination of policy implementation</li><li>Implementation of nutrition activities</li><li>Secretariat of the National Nutrition Council</li><li>Nutrition policy analysis, research and indicative planning</li><li>Monitoring of nutrition interventions and programmes</li><li>Mobilisation, management and coordination of resources</li></ol><p>&nbsp;</p><p>Following the enactment of the Nutrition Act 2024, there is need to develop a regulation that is critical for establishing and&nbsp; formalising the multisectoral governance structures that ensure food and nutrition security and better help to understand and implement the Nutrition Act 2024. The regulation will also translate political commitment into actionable, accountable and sustainable interventions. To work on the development of a Nutrition Regulation, The Gambia, Resilience, Inclusion, Skills and Equity (RISE) Project&nbsp; has sought the expertise of a Legal Expert for the task.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Objective of The Assignment:</p><p>The objective of exercise is to review and develop comprehensive nutrition regulation.</p><p>Scope of Work and Key Responsibilities:</p><p>The scope of the work will cover the following:</p><ol><li>Inception meeting to identify areas of focus for the development of the regulation</li><li>Map out which provisions of the Nutrition Act 2024 require secondary legislation particularly focusing on:<ol><li>Establishment of the Nutrition Fund (modalities, management tea composition and areas of usage)</li><li>Reference intake of vitamins and minerals in food sources</li><li>Prescription of fortification mix</li><li>Establishment of fortification coordination platform (NAFF)</li></ol></li><li>Draft a Nutrition Regulation</li><li>Conduct consultative meetings to seek the views of the stakeholders on the new draft Nutrition Regulation</li><li>Incorporate views and comments in the draft Regulation</li><li>Conduct a national validation of the draft regulation</li><li>Facilitate review by the Ministry of Justice</li><li>Finalize the Regulation and submit for approval by the Minister responsible for Nutrition</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>The Draftsman will require close collaboration with the NaNA for continued guidance.</p><p>&nbsp;</p><p>4.&nbsp; Individual Consultant Qualifications and Experience</p><p>Given the high level of technical rigor required to carry out the exercise, which is a succinct and analytically sound comprehensive Nutrition Regulation, dedicated human resource capacity is required in terms of time and technical expertise in conducting such a task. National Expert will objectively review the implementation and coordination mechanisms established by the Nutrition Act 2024 and any other relevant mechanisms. Hence an appropriate experienced expert, who is familiar with the development context in The Gambia and having good working experience of drafting regulations will be preferred. The Expert should possess the following qualification and experience:</p><ul><li>MSc in Law or equivalent</li><li>At least 5 years&rsquo; experience in legal drafting</li><li>Familiarity with Gambian law and with food, nutrition, or public health legislation</li><li>Excellent spoken and written English</li><li>Knowledgeable in computer</li></ul><p>&nbsp;</p><p><strong><u>Full TOR Availability Notice</u></strong></p><p>The full Terms of Reference (TOR) will be made available upon request. Please send your request via email to the address provided below. The contract duration is 3-6 months.</p><p>&nbsp;</p><p><strong><u>Submission of Expressions of Interest:</u></strong></p><p>The National Nutrition Agency (NaNA), through the Central Project Coordination Unit (CPCU) of the Ministry of Finance and Economic Affairs, now invites eligible individual consultants to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the services.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank&#39;s &quot;Procurement Regulations for IPF Borrowers&quot; dated February 2025 (&quot;Procurement Regulations&quot;), setting forth the World Bank&#39;s policy on conflict of interest.</p><p>A Consultant will be selected in accordance with the Individual Consultant Selection Method set out in the Consultant Guidelines. Further information and Terms of Reference can be obtained at the address below during office hours from 09:00 to 16:00 Monday to Thursday and 09:00 to 12h30 on Friday.</p><p>Expressions of interest should be delivered in email to the address below on or before August 14th, 2026 at 12:30pm Gambian time</p><p>&nbsp;</p><p><strong>Central Project Coordination Unit</strong></p><p><strong>Royal Insurance Building</strong></p><p><strong>2nd Floor, Kotu Bertil Harding Highway</strong></p><p><strong>The Gambia</strong></p><p>&nbsp;</p><p><strong>Email: </strong>nsosseh@cpcumof.gm , mktouray@cpcumof.gm , ygassama@cpcumof.gm and rsey@cpcumof.gm</p>"},{"id":"OP00459369","notice_type":"Request for Expression of Interest","noticedate":"04-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-20T00:00:00Z","submission_deadline_time":"12:00","project_ctry_name":"Egypt, Arab Republic of","project_id":"P172426","project_name":"Supporting Egypt’s Universal Health Insurance System","bid_reference_no":"EG-MOF-545938-CS-QBS","bid_description":"Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR's E-learning platform","procurement_group":"CS","procurement_method_code":"QBS","procurement_method_name":"Quality Based Selection","contact_address":"Finance Ministry Towers - Ramses Extension - Nasr City - Cairo.","contact_ctry_name":"Egypt, Arab Republic of","contact_email":"yara_gamal13@hotmail.com","contact_name":"Yara Gamal","contact_organization":"Ministry of Finance","contact_phone_no":"+201141221444","contact_web_url":"https://mof.gov.eg/ar","submission_date":"2026-08-04T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p><strong><em>Egypt</em></strong></p><p><strong>Supporting Egypt&rsquo;s Universal Health Insurance System Project</strong></p><p>Loan No.: IBRD-91320</p><p><strong>Assignment Title:&nbsp;</strong>Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR&#39;s E-learning platform</p><p><strong>Reference No:</strong>EG-MOF-545938-CS-QBS</p><p>The Ministry of Finance has received a loan of $400M from the World Bank toward the cost of the Supporting Egypt&rsquo;s Universal Health Insurance System Project, and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include consultancy aimed for&nbsp;Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR&#39;s E-learning platform</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>The &ldquo;Supporting Egypt&rsquo;s Universal Health Insurance System Project&rdquo; now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services.</p><p>Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (company profile, brochures, experience in similar assignments, availability of appropriate skills and resources, ... etc.).</p><p>The requested qualifications are:</p><ul><li><strong>Experience:</strong><ul><li>At least 10 years of proven corporate experience in designing, developing, and deploying high-traffic, secure e-learning platforms (LMS).</li><li>Demonstrated experience in end-to-end <strong>instructional design</strong> for adult professional learners.</li><li>An extensive portfolio of high-quality <strong>multimedia production</strong> (videos, animations, graphic design) for educational or corporate training purposes.</li></ul></li><li><strong>Technical Capabilities:</strong><ul><li>Expertise in modern web development frameworks, database management, and cloud hosting.</li><li>Expertise in LMS standards (e.g., SCORM, xAPI) and e-commerce integration.</li><li>&nbsp;</li></ul></li><li><strong>Proposed Team:</strong> The consultant must propose a team of key experts with the following minimum qualifications:<ul><li><strong>Project Manager:</strong> 8+ years experience managing complex IT and media projects.</li><li><strong>Lead Instructional Designer:</strong> 8+ years experience in designing e-learning curricula for professional audiences.</li><li><strong>Lead Developer / Tech Lead:</strong> 8+ years experience in full-stack development, specializing in LMS or large-scale web applications.</li><li><strong>Lead Media Producer:</strong> 8+ years experience in professional video and animation production.</li></ul></li></ul><p><em>Note: Experience in medical or nursing education is </em><strong><em>not</em></strong><em> required. The consultant will be provided with all technical medical content</em></p><p>Where a consortium is proposed, one lead firm shall assume overall contractual accountability and shall clearly demonstrate how the expertise required across both pillars will be integrated through a unified project-management and quality-assurance approach.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the&nbsp;<em>QBS</em>&nbsp;method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours 10.00 am to 4.00 pm &ndash; Sunday to Thursday.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail by 20 August, 2026</p><p>Supporting Egypt&rsquo;s Universal Health Insurance System Project.</p><p>Attn: Yara Gamal &ndash;&nbsp; Procurement Specialist.</p><p>Ministry of Finance.</p><p>Cairo &ndash; Egypt.</p><p>Tel: +2011141221444</p><p>E-mail: yara_gamal13@hotmail.com</p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Term of Reference (TOR)</u></strong></p><p><strong><u>GAHAR E &ndash; Learning Academy</u></strong></p><p>&nbsp;</p><p>The Ministry of Finance has received a loan of $400M from the World Bank toward the cost of the Supporting Egypt&rsquo;s Universal Health Insurance System Project, and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include design and execution of a comprehensive GAHAR E- Learning Academy platform with Content Development: Develop the content for the e-learning materials in alignment with the identified learning objectives.&nbsp;&nbsp; for the General Authority for Healthcare Accreditation and Regulation &ndash;GAHAR through partnership with a reputable national organization.</p><ol><li><strong><u>Background: The General Authority for Healthcare Accreditation and Regulation &ndash; GAHAR:</u></strong></li></ol><p>GAHAR was established under Law No. 2 for the year 2018 pertaining to the Universal Health Insurance system.</p><p>GAHAR is responsible of ensuring the quality of the healthcare services, and its continuous improvement; regulating the healthcare sector according to quality standards; accrediting the healthcare facilities according to these standards; and ensuring the sustainability of its implementation through regular monitoring., strongly rooted in its independence, which is stipulated by law. GAHAR is an independent authority Under the general and direct supervision of his Excellency, President of Egypt, Abdel-Fattah El-Sisi</p><p>GAHAR is mandated with the regulations, accreditation, rigorous monitoring and oversight of the healthcare facilities. it aims at attaining the best standardized quality for health throughout all healthcare facilities; Hospitals, pharmacies, clinics, and other healthcare facilities as defined in point 15 of article one in the law number two for year 2018. GAHAR&#39;s strategy has identified its mission in two main blocks: Excellence and Distinction, in pursuit to put Egypt on the edge of a new era for health care.</p><p>GAHAR handbooks are the guiding tool for healthcare facilities and surveyors, on GAHAR&rsquo; standards for accreditation and requirements for registration. To ensure its conformity with the best international practices, GAHAR applies to attain accreditation for its standards from the International Society for Quality in Healthcare &ndash;ISQua&rsquo;. Till now, GAHAR has issued the following accreditation &lsquo;handbooks:&nbsp;</p><p>&nbsp;</p><ul><li>GAHAR handbook for Hospitals standards. (ISQua Accredited).</li><li>GAHAR handbook for Primary Health Care-PHC standards (ISQua Accredited).</li><li>GAHAR handbook for Clinical laboratories standards. (ISQua Accredited).</li><li>GAHAR handbook for Physical therapy accreditation standards. (ISQua Accredited).</li><li>GAHAR handbook for Ambulatory healthcare accreditation standards. (ISQua Accredited).</li><li>&nbsp;GAHAR handbook for Radiology centers. &nbsp;(ISQua Accredited).</li><li>GAHAR handbook for Mental health.&nbsp; (ISQua Accredited).</li><li>GAHAR handbook for convalescent long &ndash; term healthcare and medical wellness accreditation standard.&nbsp; (ISQua Accredited).</li><li>GAHAR handbook for National Guide for Medical Equipment for Hospital.</li></ul><p>&nbsp;</p><p><strong><u>GAHAR Mission: </u></strong></p><p>Commitment to ensuring the quality of healthcare services and its continuous improvement in the Arab Republic of Egypt, and affirming trust in its outcomes at national, regional, and international levels through issuance and development of internationally recognized national quality standards, supporting their implementation, accrediting healthcare facilities accordingly, and continuous monitoring; to achieve excellence and sustainability.</p><p>&nbsp;</p><p><strong><u>GAHAR vision:</u></strong></p><p>To be a pioneering national authority, well-recognized regionally and internationally in ensuring the quality of healthcare services and its sustainability.</p><p>&nbsp;</p><p><strong><u>GAHAR training center:</u></strong></p><p>In alignment with the General Authority for Healthcare Accreditation and Regulations (GAHAR) mission to promote a culture of quality, and in partnership with healthcare service providers in Egypt, GAHAR is committed to raising community awareness of patient safety, fostering a culture of continuous improvement within healthcare facilities, and preparing these facilities to implement healthcare quality standards to achieve accreditation and join the Universal Health Insurance System (UHIS). To support these efforts, GAHAR has established a training center accredited by the Central Agency for Organization and Administration and the Egyptian Health Council.</p><p>The center aims to empower professionals and facilities to:</p><ul><li>Raise <strong>community awareness</strong> of patient safety.</li><li>Foster <strong>continuous improvement</strong> across health facilities.</li><li>Prepare facilities to <strong>implement quality standards</strong>, achieve accreditation, and transition smoothly into the UHIS framework.</li></ul><p><strong><u>GAHAR certification </u></strong></p><p><strong>GAHAR EGYCAP</strong> (Egyptian Certified Accreditation Professional)</p><ul><li>A firstofitskind professional diploma accredited by the Egyptian Health Council and recognized national regionally</li><li>All the Applicants have to a receive a diploma in one of universities that signed a protocol with GAHAR , this diploma include 8 modules cover all the standards , then they receive a complementary course in GAHAR about primary health care standards , finally they have to pass GAHAR &ndash; EGY CAP certificate exam organized by GAHAR</li><li>&nbsp;The reflection of EGY &ndash; Cap on upgrading leaders&rsquo; skills &nbsp;in implementing GAHAR standards, patient-safety frameworks, and continuous quality improvement</li><li>The graduates will be able to work as accreditation professionals which is a new profession in healthcare field, these graduates will help healthcare facilities in their journey for accreditation</li></ul><p><strong><u>2. Project Goal And Objectives</u></strong></p><p><strong>2.1. Overall Goal</strong></p><p>The overall goal of this assignment is to establish the &quot;GAHAR E-Learning Academy,&quot; a high-quality, accessible, and sustainable digital education platform. The Academy will serve as the central hub for training healthcare professionals in Egypt on GAHAR&#39;s quality and accreditation standards, patient safety, and continuous improvement principles, supporting the national Universal Health Insurance System (UHIS).</p><p><strong>2.2. Specific Objectives</strong></p><p>The specific objectives of this consultancy are to:</p><ol><li><strong>Design and Deploy</strong> a secure, scalable, and user-friendly Learning Management System (LMS) that functions seamlessly on desktop and mobile devices.</li><li><strong>Digitize and Produce</strong> GAHAR&rsquo;s technical content into engaging, high-quality e-learning modules (including videos, animations, interactive case studies, and assessments).</li><li><strong>Build Capacity</strong> within GAHAR to manage, update, and scale the E-Learning Academy independently.</li><li><strong>Establish a Platform</strong> that serves as a sustainable model for continuous professional development (CPD) for the Egyptian healthcare workforce.</li></ol><p><strong><u>3. Target Audience</u></strong></p><p>The primary target audiences for the E-Learning Academy include:</p><ul><li><strong>Healthcare Professionals:</strong> Doctors, nurses, pharmacists, and allied health professionals seeking CPD and certification (e.g., GAHAR EGYCAP).</li><li><strong>Healthcare Administrators and Leaders:</strong> Facility managers and policymakers responsible for implementing quality improvement systems.</li><li><strong>GAHAR Surveyors:</strong> Trainee and current surveyors requiring standardized training on accreditation processes.</li><li><strong>Public Health Practitioners:</strong> Professionals aiming to enhance their competencies in healthcare management and quality.</li><li><strong>Regional and International Learners:</strong> Professionals from other countries interested in GAHAR&#39;s accredited standards.</li></ul><p>&nbsp;</p><p><strong><u>5. Scope Of Work</u></strong></p><p>The consultant shall be responsible for all activities, personnel, and resources required to deliver the E-Learning Academy. The scope is divided into two main components.</p><p><strong>GAHAR&#39;s Role in Content:</strong> For all content-related tasks, GAHAR will act as the <strong>Subject Matter Expert (SME)</strong>. GAHAR will provide all technical source materials, accreditation handbooks, case study information, and raw data. The consultant is responsible for transforming this technical information into engaging e-learning experiences.</p><p><strong>Component 1: E-Learning Platform Development</strong></p><p>The consultant shall design, develop, test, and deploy a robust and scalable Learning Management System (LMS) with the following <strong>functional requirements</strong>:</p><ol><li><strong>LMS Core:</strong> A secure system for user registration, authentication, and profile management. GAHAR shall hold full ownership rights to the platform&#39;s source code, database, and all associated intellectual property upon delivery. The consultant must deliver the full, unencrypted source code and provide a perpetual, royalty-free license for any third-party components used.</li><li><strong>Standards </strong><strong>and Interoperability:</strong> The LMS must be fully compliant with international e-learning standards, specifically SCORM 1.2/2004, xAPI (Tin Can), and AICC. This ensures that all content produced is portable and prevents vendor lock-in, allowing GAHAR to migrate content to other systems if needed in the future.</li><li><strong>Course Management:</strong> An admin panel for GAHAR staff to easily create, upload, update, and manage courses and learning paths.</li><li><strong>Responsive Design:</strong> A fully responsive UI/UX (in both Arabic and English) that provides an optimal experience on desktops, tablets, and mobile smart phones.</li><li><strong>Assessment Engine:</strong> Ability to create diverse assessments (quizzes, summative exams, case-based evaluations) with features like question banks, randomization, and automated grading.</li><li><strong>Progress Tracking:</strong> Dashboards for learners to track their progress and for administrators to monitor user engagement and completion rates.</li><li><strong>Certification:</strong> Automated generation and delivery of certificates (e.g., PDF format) upon successful completion of a course or learning path.</li><li><strong>Interactive Tools:</strong> Features to enhance engagement, such as discussion forums, live chat capabilities, and scheduled QandA sessions with experts.</li><li><strong>E-commerce Integration:</strong> Integration with secure national payment gateways (e.g., Fawry, Paymob) and bank APIs to manage course fees.</li><li><strong>Analytics and Reporting:</strong> A comprehensive analytics dashboard for GAHAR to track key metrics (e.g., enrollment, user activity, completion rates, assessment scores).</li><li><strong>Security and Data Protection:</strong> Full compliance with Egypt&rsquo;s personal data protection law (Law No. 151 of 2020) and international data security standards.</li><li><strong>&nbsp;Infrastructure and Hosting Strategy:</strong></li></ol><ul><li><strong>Initial Deployment:</strong> The Consultant shall provide and manage a secure, high-availability cloud infrastructure (e.g., AWS, Azure, GCP, or a local Data Center) guaranteeing 99.9% uptime for the duration of the contract. The cost of this hosting must be clearly identified in the financial proposal.</li><li><strong>Portability and Migration:</strong> To ensure long-term sustainability and data sovereignty, the platform must be containerized and architected to be infrastructure-agnostic. The Consultant must demonstrate that the entire system (code, database, and assets) can be technically and legally migrated to GAHAR&rsquo;s own data center or government cloud in the future without loss of functionality or significant re-engineering.</li><li><strong>Data Ownership:</strong> GAHAR retains full legal ownership of all data hosted on the platform.</li></ul><p><strong>Component 2: E-Learning Content Production</strong></p><p>The consultant shall work with GAHAR SMEs to perform the instructional design and multimedia production for the curriculum.</p><ol><li><strong>Instructional Design:</strong><ul><li>Review GAHAR&#39;s technical source materials (handbooks, lectures, EGYCAP content).</li><li>Develop detailed storyboards and scripts for all multimedia content, optimized for adult e-learning.</li><li>Design the pedagogical structure for each course, including learning objectives, module flow, and assessment strategy.</li></ul></li><li><strong>Multimedia Production:</strong><ul><li>Produce all multimedia assets defined in the curriculum (see Section 6). This includes filming GAHAR experts, recording voice-overs, and designing all graphics and animations.</li><li>Edit all assets into high-quality, web-optimized formats (e.g., SCORM-compliant packages).</li></ul></li><li><strong>Course Assembly:</strong><ul><li>Assemble all assets (videos, quizzes, readings) into cohesive course modules within the LMS.</li><li>Conduct internal Quality Assurance (QA) on all modules for technical functionality, accessibility, and instructional clarity.</li></ul></li></ol><p><strong><u>7. </u></strong><strong><u>Component 2: </u></strong><strong><u>E-Learning Content Production - Overview:</u></strong></p><p><strong>Placeholder Curriculum:</strong> The consultant shall base their proposals on developing the following initial curriculum. The final list and topics will be confirmed during the project&#39;s inception phase.</p><ol><li><strong>Modules:</strong> 8 modules covering all GAHAR standards.</li><li><strong>Media Assets (to be produced):</strong><ul><li><strong>12 Educational Videos:</strong> Professionally filmed and edited videos of GAHAR experts explaining key concepts (approx. 10-15 minutes each).</li><li><strong>6 Animation Videos:</strong> 2D/3D animated videos to explain complex processes or concepts (approx. 2-5 minutes each).</li><li><strong>6 Graphic Videos:</strong> Motion-graphic videos (approx. 2-5 minutes each).</li></ul></li><li><strong>Assessments:</strong> Formative quizzes for each module and a final summative exam.</li></ol><p>&nbsp;</p><p><strong><u>8. Component 2: E-Learning Content Production &ndash; Structure details:</u></strong></p><p><strong>2.1-Multimedia Content</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Format</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p><strong>Purpose</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Training Material</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Modules and media assets as per the GAHAR curriculum (provided by GAHAR)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Instructor Videos</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>GAHAR-accredited experts explaining key concepts</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Interactive Slideshows</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Accreditation checklists, patient safety modules</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Simulations/Case Studies</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Real-world quality improvement and safety scenarios, their material developed by GAHAR</p></td></tr></tbody></table><p><strong>2.2Assessment Tools</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p><strong>Tool Type</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:522px\"><p><strong>Description</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px\"><p>Formative Quizzes</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px; width:522px\"><p>Embedded in each module, auto graded</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p>Summative Exams</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:522px\"><p>Required for certification, timed and randomized questions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px\"><p>Assignments</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px; width:522px\"><p>Uploaded through portal, reviewed by moderators or course leads</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>2.3. Text-Based Content</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in\"><p><strong>Format</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in; width:497px\"><p><strong>Purpose</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in\"><p>Reading Packets</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in; width:497px\"><p>GAHAR standards for hospitals, labs, primary care, etc.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p>Discussion Prompts</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:497px\"><p>Encourage critical thinking and peer exchange</p></td></tr></tbody></table><p><strong>2.4- Engagement and Communication Tools</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Feature</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p><strong>Functionality</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Discussion Forums</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>Peer-to-peer and expert-to-peer interaction</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Chat with Experts</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>Integrated secure live chat and scheduled QandA sessions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Notifications and Emails</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>System-generated reminders, announcements and deadlines via email/SMS</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><u>9. Platform technical specifications:</u></strong></p><p><strong><u>&nbsp;1-Web site development , Technical &nbsp;features ; </u></strong></p><ol><li><strong>Web &amp; Mobile Architecture</strong></li></ol><ul><li><strong>Frontend Frameworks:</strong> Modern JavaScript component-based architectures (e.g., <strong>React.js</strong>, Angular, or Vue.js).</li><li><strong>Mobile Application:</strong> Native (Swift/Kotlin) or high-performance Cross-platform framework (e.g., <strong>React Native</strong>, Flutter) ensuring 100% functionality on both iOS and Android devices.</li><li><strong>Styling &amp; UI:</strong> Modern CSS frameworks and UI libraries (e.g., <strong>Tailwind CSS</strong>, <strong>Material-UI</strong>, or Bootstrap 5+).</li></ul><ol><li><strong>Backend &amp; Database</strong></li></ol><ul><li><strong>Server Framework:</strong> Scalable, high-performance server-side framework (e.g., <strong>Node.js with Express</strong>, Python Django, or .NET Core).</li><li><strong>Database Management:</strong><ul><li><strong>Primary (Relational):</strong> Robust SQL database for transactional data (e.g., <strong>PostgreSQL</strong>, MySQL, or SQL Server).</li><li><strong>Secondary (Unstructured):</strong> NoSQL database for logs, chats, and unstructured content (e.g., <strong>MongoDB</strong>).</li></ul></li><li><strong>Authentication &amp; Security:</strong> Implementation of standard secure protocols including <strong>OAuth 2.0</strong> and <strong>JWT</strong> (JSON Web Tokens) for secure, stateless user sessions.</li></ul><ol><li><strong>Artificial Intelligence &amp; Machine Learning (AI/ML)</strong></li></ol><ul><li><strong>Recommendation Engine:</strong> Implementation of ML libraries (e.g., <strong>TensorFlow.js</strong>, Scikit-learn) to provide personalized course recommendations based on user behavior.</li><li><strong>Natural Language Processing (NLP):</strong> Integration with LLM APIs (e.g., <strong>OpenAI API</strong>, Azure OpenAI) to power language-based features. <em>Note: Proposals using 3rd party APIs must clearly state ongoing subscription costs.</em></li></ul><ol><li><strong>Infrastructure &amp; Hosting Responsibilities</strong></li></ol><ul><li><strong>Consultant Responsibility:</strong> The Consultant shall be fully responsible for providing, configuring, and paying for the cloud hosting infrastructure (e.g., <strong>AWS [EC2, S3, RDS]</strong>, <strong>Google Cloud Platform</strong>, <strong>Azure</strong>, or a certified Data Center) for the entire duration of the contract. The financial proposal must explicitly include these hosting costs.</li><li><strong>Performance Requirements:</strong> The infrastructure must be scalable (using containerization tools like <strong>Docker</strong> and orchestration via <strong>Kubernetes</strong>) and must guarantee <strong>99.9% uptime</strong>.</li><li><strong>Future Handover:</strong> To ensure sustainability, the system must be designed to be infrastructure-agnostic. The Consultant must include a comprehensive <strong>&quot;Handover Plan&quot;</strong> to migrate the entire platform (code, database, and data) to GAHAR&rsquo;s own servers or a government cloud at the end of the contract term.</li></ul><ol><li><strong>Payment Integration</strong></li></ol><ul><li><strong>Payment Gateways:</strong> Secure integration with major national and international payment providers, specifically <strong>Fawry</strong>, <strong>Paymob</strong>, <strong>Apple Pay</strong>, and direct <strong>Bank API Integrations</strong>.</li></ul><ol><li><strong>Mobile App Advanced Features (Communication &amp; Analytics)</strong></li></ol><ul><li><strong>Communication Services:</strong> Integration with services like <strong>Twilio</strong> or <strong>Firebase</strong> for SMS notifications, OTPs, and real-time messaging.</li><li><strong>Analytics:</strong> Integration with <strong>Google Analytics</strong> (GA4) or Firebase Analytics for user tracking, with capability to export data to custom dashboards using <strong>Tableau</strong> or <strong>Power BI</strong>.</li></ul><ol><li><strong>AI-Powered Support (Chatbot)</strong></li></ol><ul><li><strong>AI Chatbot:</strong> An intelligent chatbot capable of handling common user inquiries and automatically redirecting complex issues to the appropriate support team or resources.</li></ul><p><strong><u>10. </u></strong><strong><u>Project Deliverables and Timeline</u></strong></p><p>The expected duration of the assignment shall be <strong>six (6.5) calendar months</strong> from the contract commencement date, equivalent to approximately 26 weeks. The implementation shall follow an accelerated approach, with platform development, instructional design and multimedia production undertaken through coordinated parallel workstreams.</p><p>&nbsp;</p><p>GAHAR shall provide one consolidated set of comments within <strong>five (5) working days</strong> of receiving each deliverable. The Consultant shall address the comments and resubmit the revised deliverable within a maximum of <strong>five (5) working days</strong>, unless the requested changes constitute a material change to the approved scope.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:616px\"><thead><tr><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:91px\"><p><strong>Project Phase</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:33px\"><p><strong>#</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:112px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:207px\"><p><strong>Main Contents and Acceptance Requirements</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:125px\"><p><strong>Timeline from Contract Commencement Date<br />(including GAHAR review and revision)</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:48px\"><p><strong>Payment</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 1: Inception and Requirements Validation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Inception Report and Detailed Implementation Plan</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Confirmed requirements and scope; implementation methodology; detailed work plan; governance arrangements; stakeholder map; RACI matrix; risk register; content inventory; multimedia production plan; dependency register; QA plan; and deliverable acceptance criteria.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 1-2<br /><strong>Submission: </strong>End of Week 2<br /><strong>GAHAR review: </strong>Week 3 - five working days<br /><strong>Revision and acceptance: </strong>Week 4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 1: Solution and Content Design</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Technical Design, UI/UX and Instructional Design Package</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>System architecture; technology stack; database and integration design; security and data-protection plan; hosting, backup and migration strategy; bilingual web and mobile prototypes; instructional-design framework; module structure; assessment approach; and representative course blueprint.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 2-5<br /><strong>Submission: </strong>End of Week 5<br /><strong>GAHAR review: </strong>Week 6 - five working days<br /><strong>Revision and acceptance: </strong>Week 7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 2: Alpha Development and Content Pre-production</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Alpha Platform and Content-Production Package</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Functional alpha platform covering principal learner, trainer and administrator journeys; user and role management; initial course-management features; approved storyboards and scripts for the eight modules; draft assessment banks; and representative samples of the instructor-video, animation and motion-graphic formats.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 5-10<br /><strong>Submission: </strong>End of Week 10<br /><strong>GAHAR review: </strong>Week 11 - five working days<br /><strong>Revision and acceptance: </strong>Week 12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>20%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 2: Full Development, Content Production and Pilot</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Pilot-Ready Beta Platform, Draft Content and Pilot Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Pilot-ready web platform and mobile applications; administration portal; assessments; analytics; notifications; communication tools; payment integrations in sandbox mode; AI-enabled functionality; draft SCORM modules and multimedia content; internal QA; pilot testing with 20-30 users; defect log; pilot report; and corrective-action plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 9-17<br /><strong>Submission: </strong>End of Week 17<br /><strong>GAHAR review: </strong>Week 18 - five working days<br /><strong>Revision and acceptance: </strong>Week 19</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>25%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 3: Finalization and Production Launch</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Final Multimedia Content and Production Platform</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Final approved content for all eight modules; 12 instructor videos; six animation videos; six motion-graphic videos; quizzes and final examination; fully tested production platform; completed integrations; analytics dashboard; backup and recovery arrangements; performance and security testing; mobile applications submitted to the relevant application stores; approved UAT results; and production launch.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 18-22<br /><strong>Submission: </strong>End of Week 22<br /><strong>GAHAR review: </strong>Week 23 - five working days<br /><strong>Revision and acceptance: </strong>Week 24</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>20%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 4: Stabilization, Training and Handover</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D6</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Stabilization, Training, Handover and Final Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Post-launch monitoring; correction of stabilization defects; two-day training for GAHAR staff; source code and repositories; database and configuration files; deployment scripts; technical, administrator and user manuals; system credentials; hosting and licensing records; maintenance and migration guidance; final report; and formal handover certificate.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 22-24<br /><strong>Submission: </strong>End of Week 24<br /><strong>GAHAR review: </strong>Week 25 - five working days<br /><strong>Revision and final acceptance: </strong>Week 26</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:91px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:112px\"><p><strong>Total</strong></p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:207px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:125px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong><u>11. Gahar&#39;s Responsibilities</u></strong></p><p>GAHAR will provide the following to support the consultant:</p><ul><li><strong>Designated Project Team:</strong> Appoint a Project Manager and technical focal points to liaise with the consultant.</li><li><strong>All Technical Content:</strong> Provide all source materials (handbooks, standards, EGYCAP content, case studies) required for content production.</li><li><strong>Access to SMEs:</strong> Ensure timely access to GAHAR&#39;s subject matter experts for content review, storyboarding sessions, and video filming.</li><li><strong>Timely Feedback: </strong>Provide consolidated feedback on all deliverables within five (5) working days of receipt.</li><li><strong>Final Quality Assurance:</strong> GAHAR will conduct the final review and approval (QA) of all content and platform features before public launch.</li><li><strong>Pilot Testers:</strong> Facilitate the recruitment of 20-30 pilot testers from the target audience. The testers would be volunteers of GAHAR surveyors, healthcare professional undergoing CPD and certification (e.g., GAHAR EGYCAP), and facility managers responsible for healthcare quality and no form of payment or allowances will be paid to them. The goal would be to test whether the target audience are able to use to use the learning platform efficiently and effectively without any bugs or issues, and to get their feedback on possible improvements needed.</li></ul><p><strong><u>12. Consultant Qualifications</u></strong></p><p>The consultant must demonstrate the following qualifications:</p><ul><li><strong>Experience:</strong><ul><li>At least 10 years of proven corporate experience in designing, developing, and deploying high-traffic, secure e-learning platforms (LMS).</li><li>Demonstrated experience in end-to-end <strong>instructional design</strong> for adult professional learners.</li><li>An extensive portfolio of high-quality <strong>multimedia production</strong> (videos, animations, graphic design) for educational or corporate training purposes.</li></ul></li><li><strong>Technical Capabilities:</strong><ul><li>Expertise in modern web development frameworks, database management, and cloud hosting.</li><li>Expertise in LMS standards (e.g., SCORM, xAPI) and e-commerce integration.</li><li>&nbsp;</li></ul></li><li><strong>Proposed Team:</strong> The consultant must propose a team of key experts with the following minimum qualifications:<ul><li><strong>Project Manager:</strong> 8+ years experience managing complex IT and media projects.</li><li><strong>Lead Instructional Designer:</strong> 8+ years experience in designing e-learning curricula for professional audiences.</li><li><strong>Lead Developer / Tech Lead:</strong> 8+ years experience in full-stack development, specializing in LMS or large-scale web applications.</li><li><strong>Lead Media Producer:</strong> 8+ years experience in professional video and animation production.</li></ul></li></ul><p><em>Note: Experience in medical or nursing education is </em><strong><em>not</em></strong><em> required. The consultant will be provided with all technical medical content.</em></p><p><strong><u>13. Evaluation Criteria</u></strong></p><p>The Technical Proposal will be evaluated based on the following criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Max. Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>1. Consultant&rsquo;s General Experience (30 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1.1. Experience in developing scalable e-learning platforms (LMS).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1.2. Experience in instructional design and multimedia content production for e-learning.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>2. Technical Approach and Methodology (30 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2.1. Clarity and feasibility of the proposed approach for platform development (Component 1).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2.2. Quality of the proposed methodology for content production and instructional design (Component 2).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>3. Qualifications of Key Personnel (40 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.1. Project Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.2. Lead Instructional Designer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.3. Lead Developer / Tech Lead</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.4. Lead Media Producer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Total Technical Score</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong><u>Notes:</u></strong></p><ul><li>Technical Experience&nbsp;includes previous projects of similar nature and complexity, demonstrated capabilities, and references, years of experience not less than 8 years&nbsp;.</li><li>Financial Offer&nbsp;will be evaluated based on cost-effectiveness and alignment with project budget.</li><li>Team Structure&nbsp;refers to the composition, roles, and responsibilities of the proposed team.</li><li>Qualifications&nbsp;involve the educational and professional background of key team members.</li></ul>"},{"id":"OP00456649","notice_type":"Request for Expression of Interest","noticedate":"03-Aug-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-20T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Liberia","project_id":"P177478","project_name":"Governance Reform and Accountability Transformation (GREAT) Project","bid_reference_no":"LR-MFDP-561277-CS-INDV","bid_description":"Engagement of Resident Consultant for the Revenue Tax Policy Division","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Broad Street\nCorners of Broad & Mechlin Streets\nMonrovia","contact_ctry_name":"Liberia","contact_email":"jkamara@mfdp.gov.lr","contact_name":"Jim- ngormoh Amara Kamara","contact_organization":"Ministry of Finance and Development Planning","contact_phone_no":"0777638969","submission_date":"2026-08-03T00:00:00Z","notice_text":"<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; INDIVIDUAL SELECTION)</strong></p><p><strong><em>LIBERIA</em></strong></p><p><strong>Governance Reform and Accountability Transformation (GREAT) Project</strong></p><p><strong>Project ID: P177478</strong></p><p>Credit No..:<strong><u> 7511-LR</u></strong></p><p>Assignment Title:<strong> Engagement of a Resident National Consultant for the Revenue and Tax Policy Division </strong><strong>&nbsp;</strong><strong>&nbsp;</strong></p><p><strong>Assignment Level :&nbsp; Position for National Consultant </strong></p><p><strong>Reference No</strong>.: <strong>LR-MFDP-561277-CS-INDV</strong></p><p>The Government of Liberia (GoL) has received financing from the International Development Association (IDA) toward the cost of the Governance Reform and Accountability Transformation (GREAT) Project and intends to apply part of the proceeds to eligible payments under the contract for which this Terms of Reference (ToR) is issued. This procurement process will be conducted in accordance with the World Bank&rsquo;s Procurement Regulations for IPF Borrowers (July 2016, revised September 2023 and February 2025) and is open to all eligible bidders as defined in the Procurement Regulations and the procedures outlined herein. Payments by the World Bank will be made only at the request of the GREAT Project and upon approval by the Bank, subject to the terms and conditions of the Financing Agreement.</p><p>To this end, the Ministry of Finance and Development Planning (MFDP), through its Department of Fiscal Affairs, seeks to hire a <strong>Resident Consultant for Tax Policy Division</strong> to provide technical assistance and strategic support to the Tax Policy Division. The consultant will support tax policy formulation, revenue analysis, and strategic advice aimed at improving domestic resource mobilization.</p><p>Liberia&rsquo;s tax system is undergoing reforms to improve revenue mobilization, enhance fiscal sustainability, and strengthen public service delivery. As part of this effort, the Resident Consultant for Tax Policy Division will work closely with key stakeholders, including the Liberia Revenue Authority (LRA) and development partners, to provide strategic advisory and technical support for effective policy formulation and implementation. This ToR is issued for the selection of a highly qualified Resident Consultant for Tax Policy Division for Tax Policy.</p><p><strong>1. Objectives of the Assignment</strong></p><p>The primary objective of this assignment is to support the Ministry of Finance and Development Planning in achieving sustainable revenue growth by ensuring the formulation and implementation of effective, data-driven tax policies. The Resident Consultant for Tax Policy Division will provide strategic advisory services and technical expertise to improve the government&rsquo;s revenue mobilization, fiscal sustainability, and the overall effectiveness of tax policies.</p><p><strong>2. Scope of Work</strong></p><p>The Resident Consultant for Tax Policy Division will undertake the following key tasks:</p><ol><li><strong>Capacity building </strong><ol><li>Support the ministry develop fit for purpose learning and development needs for the tax and revenue policy teams;</li><li>Support the ministry on developing a learning and development strategy/plan to respond to the needs identified above.</li><li>Support government implement the learning and development strategy.&nbsp;&nbsp;<ol><li>.<strong>Technical Assistance</strong></li></ol></li></ol></li></ol><ul><li>Support the Tax Policy Division in analyzing and evaluating existing tax policies, tax rates, and their impact on revenue mobilization.</li><li>Support government of Liberia Develop policy recommendations based on thorough economic and fiscal analysis.</li><li>Assist in preparing policy statements, reports, and advocacy materials for internal and external stakeholders.</li></ul><ul><li><strong>Revenue Performance Analysis</strong></li><li>support designated tax policy staff to collect and analyze data on tax revenue performance and identify tax gaps and trends.</li><li>support designated tax policy staff to Conduct diagnostic assessments of revenue administration capabilities.</li><li>Develop processes and systems aimed at ensuring collaborate with relevant units takes place to prepare diagnostic reports and recommend corrective measures.</li></ul><ul><li><strong>Strategic Advisory Support</strong></li><li>Advise the Assistant Minister and Deputy Minister for Fiscal Affairs on strategies to achieve revenue targets.</li><li>Provide input for strategic meetings with government officials, international organizations, and development partners.</li><li>&nbsp;</li><li><strong>Policy Formulation and Implementation</strong></li><li>Facilitate and support designated staff to prepare tax policy documents, including cost-benefit analyses of tax exemptions and incentives.</li><li>Support designated staff, evaluate the impact of various tax policies on revenue mobilization and economic growth.</li></ul><p><strong>f) Coordination and Collaboration</strong></p><ul><li>Set up collaboration mechanisms and ensure designated tax policy officials work closely with the Liberia Revenue Authority (LRA) and other government agencies to gather data and provide recommendations.</li><li>Support designated government officials conduct comparative analyses of various tax revenue streams.</li></ul><p><strong>g) Reporting and Documentation</strong></p><ul><li>Submit progress reports detailing work undertaken, achievements, challenges, and recommendations.</li><li>Prepare mid-term and final reports summarizing overall contributions and lessons learned.</li></ul><p>The detailed Terms of Reference (ToR) for the assignment can be obtained at the address given below</p><p><strong>Required</strong> <strong>Consultant&rsquo;s Qualifications and Expertise&nbsp; </strong></p><p>MFDP now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Candidates will be evaluated based on the following criteria:</p><p><strong>Minimum Qualifications:</strong></p><ul><li>An advanced degree in Economics, Public Finance, Accounting, or a related discipline. <strong>10 Points</strong></li><li>At least 7 years of professional experience in tax policy formulation, analysis, and implementation. <strong>30 Points</strong></li><li>Strong analytical and research skills in the areas of taxation and revenue mobilization. <strong>20 Points</strong></li><li>Demonstrated knowledge of tax policy frameworks and fiscal management strategies. <strong>10 Points</strong></li><li>Experience working with government agencies and development partners. <strong>20 Points</strong></li><li>Experience with World Bank-funded projects or similar donor-funded programs is an advantage. <strong>10 Points</strong></li><li>&nbsp;</li><li><strong>Duration of the Assignment</strong></li></ul><p>The assignment will be carried out over a period of one year from the date of contract signature, and may be extended based on satisfactory performance and availability of funding.</p><p><strong>Method of Selection</strong></p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated September 2023, revised February 2025 and September 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; The Consultant will be selected in accordance with the Approved Selection Methods for Individual Consultant Based Selection set out in the Procurement Regulations.</p><p><strong>Submission date</strong></p><p>Expressions of interest must be delivered in written form to the address below (in person, or by mail, or by e-mail) by 1700 hours on 20th&nbsp; August, 2026.</p><p>Further information can be obtained at the address below during office hours from<em> 0900 to 1700 hours.</em></p><p>Attn: Jim-ngormoh A. Kamara, Project Team Lead</p><p>Governance Reform and Accountability Transformation (GREAT) Project</p><p>Office of the Deputy Minister for Economic Management</p><p>Department of Economic Management</p><p>Ministry of Finance and Development Planning (MFDP)</p><p>Broad &amp; Mechlin Streets</p><p>Monrovia, Liberia</p><p>Tel: +231-777-638-969</p><p>E-mail: jkamara@mfdp.gov.lr</p><p>Cc: mmassaquoi@mfdp.gov.lr &nbsp;</p>"},{"id":"OP00459857","notice_type":"Request for Expression of Interest","noticedate":"30-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-17T00:00:00Z","submission_deadline_time":"11:45","project_ctry_name":"Caribbean","project_id":"P182034","project_name":"Caribbean Regional Connectivity and Logistics MPA","bid_reference_no":"DM-CSU-564635-CS-INDV","bid_description":"Analytical Study to Support the Preparation of the Connectivity and Logistics Programme for the Commonwealth of Dominica","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"5th Floor\nFinancial Centre\nKennedy Avenue\nRoseau, Dominica","contact_ctry_name":"Dominica","contact_email":"crlcprocurement@gmail.com","contact_name":"Tamika Lafond","contact_organization":"Central Services Unit","contact_phone_no":"767-266-3158","contact_web_url":"https://www.finance.gov.dm/en/","submission_date":"2026-07-30T00:00:00Z","notice_text":"<p><strong>COMMONWEALTH OF DOMINICA</strong></p><p><strong>MINISTRY OF TOURISM </strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</strong></p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; INDIVIDUAL CONSULTANT SELECTION)</strong></p><p><strong>Country:</strong> Commonwealth of Dominica</p><p><strong>Project: </strong>Preparation Grant for Caribbean Connectivity and Logistics Regional Program &ndash; Multiphase Programmatic Approach (MPA) &nbsp;</p><p><strong>Grant No.:</strong> E5950-001</p><p><strong>Assignment Title:</strong> Analytical Study to Support the Preparation of the Connectivity and Logistics Program for the Commonwealth of Dominica</p><p><strong>Reference No.:</strong> DM-CSU-564635-CS-INDV</p><p>&nbsp;</p><p>The Government of the Commonwealth of Dominica<strong> </strong>has received financing from the World Bank toward the cost of the Preparation Grant for Caribbean Connectivity and Logistics Regional Program &ndash; Multiphase Programmatic Approach and intends to apply part of the proceeds toward payments under the contract for &ldquo;<strong>Analytical Study to Support the Preparation of the Connectivity and Logistics Program for the Commonwealth of Dominica&rdquo;</strong>.</p><p>The Ministry of Tourism<strong> </strong>now invites eligible Individual Consultants (&quot;Consultants&quot;) to indicate their interest in providing the services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>Scope of the Assignment</strong></p><p>The Individual Consultant will be responsible for, but not limited to, the following:</p><ol><li>Conduct a focused diagnostic of Dominica&#39;s connectivity and logistics sector, including ports, road connectivity, trade facilitation, private sector participation, and green logistics.</li><li>Identify priority policy reforms, institutional strengthening measures, and infrastructure investments to improve the country&#39;s transport and logistics systems.</li><li>Prepare a comprehensive Dominica Country Program Document aligned with the three components of the Caribbean Reconnect Multi-Phase Programmatic Approach (MPA).</li><li>Develop an implementation and financing roadmap, including investment priorities, results framework, project preparation activities, and recommendations for World Bank, IFC, and MIGA engagement.</li><li>Consult with relevant government agencies, development partners, and private sector stakeholders, and facilitate a validation workshop to finalize the proposed program.</li></ol><p><strong>A detailed Terms of Reference (TOR) for the assignment is attached to this Request for Expressions of Interest</strong>.</p><p><strong>Minimum Qualifications and Experience</strong></p><p>The selected consultant should possess the following:</p><ul><li>A postgraduate degree in transport economics, logistics, infrastructure planning, engineering, public policy, economics, or a related field.</li><li>At least 12 years of professional experience in transport sector development, logistics, trade facilitation, and/or connectivity, with a strong track record in analytical and program preparation assignments.</li><li>Demonstrated experience in preparing World Bank-financed operations or similar assignments for multilateral development banks, including strategic program development and investment planning.</li><li>Proven knowledge of maritime transport, port operations, multimodal logistics, and transport sector policy and institutional frameworks.</li><li>Familiarity with private sector participation frameworks, climate-resilient infrastructure, and green logistics initiatives in the transport sector.</li><li>Experience working in Small Island Developing States (SIDS) and/or the Caribbean region will be an advantage.</li><li>Excellent analytical, report-writing, and communication skills, with fluency in written and spoken English.</li></ul><p><strong>Selection Method</strong></p><p>The selection will be conducted in accordance with the Open International Market Approach for Individual Consultants as set out in the <strong>World Bank&rsquo;s Procurement Regulations for IPF Borrowers: Procurement in Investment Project Financing, Goods, Works, Non-Consulting Services and Consulting Services</strong> <strong>(February 2025),</strong> and is open to all eligible consultants as defined in the Procurement Regulations.</p><p>Interested consultants should note the provisions on Conflict of Interest as set out in the World Bank Procurement Regulations.</p><p><strong>Submission of Expressions of Interest</strong></p><p>Interested Individual Consultants should submit an Expression of Interest comprising:</p><ul><li>A cover letter expressing interest in the assignment;</li><li>A detailed Curriculum Vitae (CV) demonstrating relevant qualifications and experience; and</li><li>Any other supporting documentation relevant to the assignment.</li></ul><p>Expressions of Interest must be submitted by <strong>Monday,</strong> <strong>August 17, 2026, at 11:59 p.m. (local time)</strong> by email or in hard copy to the address below.</p><p>&nbsp;</p><p><strong>Attention:</strong></p><p>Ms. Carolla Belle</p><p>Deputy General Manager<br />Dominica Air &amp; Sea Ports Authority &nbsp;<br />Woodbridge Bay, Fond Cole, P.O. Box 243,</p><p>Roseau, Commonwealth of Dominica</p><p><strong>Telephone:</strong> 767-255-9110 | 767-266-3158<br /><strong>Email:</strong> deputygm@daspa.dm with a copy to crlcprocurement@gmail.com<br /><strong>Website: </strong><strong>https://www.domports.daspa.dm</strong></p><p><strong>Late submissions may not be considered. Only shortlisted consultants will be contacted.</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>GOVERNMENT OF THE COMMONWEALTH OF DOMINICA</strong></p><p><strong>MINISTRY OF TOURISM</strong></p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:642px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:186px\"><p><strong>Project ID:&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:456px\"><p><strong>P182034</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Project Name:&nbsp;</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>Caribbean Connectivity and Logistics Regional Program &ndash; Multiphase Programmatic Approach (MPA)</strong> &nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Procurement </strong><strong>Category:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>Consultancy Services</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Selection Type: </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>Individual Consultant (IC)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Assignment Title:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>Analytical Study to Support the Preparation of the Connectivity and Logistics Program for the Commonwealth of Dominica.</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Duration of Assignment:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>Six (6) Months </strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p><strong>Estimated Start Date:</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:456px\"><p><strong>September 01, 2026</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>1. Background and Context</strong></p><p>The Commonwealth of Dominica is a small island developing state (SIDS) in the Eastern Caribbean, with a population of approximately 72,000 and an economy heavily dependent on tourism, agriculture, and remittances. Like many OECS member states, Dominica faces structural connectivity challenges that constrain trade competitiveness, private sector growth, and economic resilience. Its main trade gateway &mdash; the Port of Roseau &mdash; suffers from infrastructure limitations, including a cargo pier design that restricts operational efficiency due to warehouses occupying a significant portion of the terminal, and the absence of ship-to-shore equipment. The Port of Portsmouth serves as a dedicated cargo terminal but is also constrained in capacity. Road connectivity, particularly to rural and agricultural areas, remains inadequate and highly vulnerable to natural disasters.</p><p>Dominica is also highly exposed to climate-related shocks. Hurricane Maria (2017) caused damages estimated at over 220 percent of GDP, severely disrupting transport infrastructure, supply chains, and livelihoods. This experience has underscored the urgent need to build not only more efficient but fundamentally more resilient connectivity infrastructure and logistics systems.</p><p>The Caribbean Reconnect Multi-Phase Programmatic Approach (MPA) is a joint World Bank Group initiative &mdash; involving the World Bank, IFC, and MIGA &mdash; designed to strengthen connectivity, logistics, and infrastructure across the Caribbean. The program is structured around the following three components:</p><ul><li><strong>Component 1 (Reforms),</strong> which establishes enabling regulatory foundations at national and regional levels with a focus on Private Sector Participation (PSP), trade facilitation, and supply chain security;</li></ul><ul><li><strong>Component 2 (Enabling Infrastructure),</strong> which identifies and prepares high-impact national infrastructure investments including port modernization, resilient connectivity, digitalization, and decarbonization; and</li></ul><ul><li><strong>Component 3 (Mobilization),</strong> which develops a regional financing scheme to aggregate projects and unlock private capital at scale.</li></ul><p>Phase 1 of the program is expected by FY2028, with the Eastern Caribbean Corridor as the first movers.</p><p>This Terms of Reference (ToR) concerns the preparation of the Dominica country program under the Caribbean Reconnect MPA. The Consultant&#39;s primary task is to produce the analytical and strategic foundation needed to design a coherent Dominica program across all three MPA components, calibrated to Dominica&#39;s market status and grounded in the government&#39;s own priorities.</p><p>A critical and distinctive feature of this assignment is that the Government of Dominica, through DASPA, has already developed a substantive project concept &mdash; the DASPA Digitalization Project Conceptualization Proposal &mdash; covering a structured six-component digital transformation roadmap for DASPA&#39;s port operations. The Government-owned concept represents a significant investment of institutional knowledge and strategic thinking, and must be treated as the primary analytical foundation for the digitalization and infrastructure dimensions of the program. The technical review and validation of this concept will be carried out in parallel by World Bank STCs with specialized port technology expertise. The Consultant under this ToR will ensure that the findings of that review are fully integrated into the Dominica program design.</p><p><strong>2. Objectives of the Assignment </strong></p><p>The consultancy has two (2) overarching objectives:</p><ul><li><strong>Objective 1 &mdash; Connectivity and Logistics Diagnostic:</strong> To produce a focused, evidence-based diagnostic of Dominica&#39;s connectivity and logistics landscape &mdash; covering maritime port infrastructure, road connectivity and hinterland access, inter-island maritime services, trade facilitation, private sector participation readiness, and green logistics opportunities &mdash; identifying the key constraints and opportunities that the Reconnect MPA country program should address. The diagnostic must be structured to generate findings that directly inform the design of all three MPA components (Reforms, Enabling Infrastructure, Mobilization).</li></ul><ul><li><strong>Objective 2 &mdash; Dominica MPA Country Program Design: </strong>To produce a structured, financeable Dominica Country Program Document, aligned with the three-component architecture of the Caribbean Reconnect MPA, that integrates: (a) the findings of the World Bank STC technical review of the DASPA Digitalization Concept; (b) the broader connectivity and logistics diagnostic; and (c) an assessment of private sector participation opportunities and the joint WBG engagement strategy (World Bank, IFC, MIGA). The Country Program Document must be sufficiently developed to serve as the basis for a World Bank lending operation under the Reconnect MPA, with a target of FY2028 for Phase 1.</li></ul><p><strong>3. Scope of Work</strong></p><p><strong>3.1 Component 1: Focused Connectivity and Logistics Diagnostic</strong></p><p>To complement the government&#39;s digitalization concept with the broader analytical framing required by the Caribbean Reconnect Program, the Consultant will conduct a targeted &mdash; not exhaustive &mdash; diagnostic of Dominica&#39;s connectivity and logistics landscape. Given the budget and duration of this assignment, the diagnostic should be focused and evidence-based, drawing heavily on existing data and studies rather than generating new primary research from scratch. The diagnostic will cover the following dimensions:</p><ul><li><strong>Port infrastructure and operations:</strong>&nbsp;A focused assessment of the Port of Roseau (Woodbridge Bay) and the Port of Portsmouth (Longhouse), covering physical infrastructure, equipment gaps, cargo dwell times, throughput trends, operational bottlenecks, the cruise-cargo interface challenge at Roseau, and resilience to natural hazards, with a view to identify a priority investment program, in particular for Woodbridge Bay, to improve and rationalize operations in the short-term. Where relevant, the assessment should also consider the implications of Dominica&#39;s planned new cargo port for the future configuration of port operations.&nbsp; To this end, the diagnosis shall include comprehensive Terms of Reference for the drafting of a National Port Development Master Plan.</li></ul><p>&nbsp;</p><ul><li><strong>Road connectivity and hinterland access:</strong>&nbsp;An assessment of the road network linking ports to key productive zones (particularly agricultural areas and agro-processing facilities), population centers, and inter-island ferry terminals. The analysis should focus on: identifying the most critical road links for logistics efficiency; assessing vulnerability to natural disasters and climate events; and estimating the logistics cost implications of road quality and reliability constraints. This analysis should draw on existing road assessments and post-Maria reconstruction data rather than generating new surveys.</li></ul><p>&nbsp;</p><ul><li><strong>Inter-island maritime connectivity:</strong>&nbsp;A review of current maritime services connecting Dominica to its neighbors (particularly Guadeloupe, Martinique, and other OECS islands), covering frequency, reliability, cargo capacity, and freight rates. The assessment should identify specific constraints &mdash; such as port infrastructure limitations, regulatory barriers, or limited-service competition &mdash; that restrict Dominica&#39;s ability to trade efficiently within the region, and assess opportunities for improving inter-island maritime services as part of the rEconnect program.</li></ul><p>&nbsp;</p><ul><li><strong>Trade facilitation and customs:</strong>&nbsp;A review of existing customs procedures, border management systems, and compliance status with the WTO Trade Facilitation Agreement, identifying key regulatory and procedural barriers affecting importers, exporters, and logistics service providers.</li></ul><p>&nbsp;</p><ul><li><strong>Trade flows and private sector landscape:</strong>&nbsp;A concise review of Dominica&#39;s import/export patterns, trade costs, and key private sector logistics actors (freight forwarders, shipping agents, trucking companies, warehouse operators), drawing on available data from Customs, DASPA, and regional sources. The analysis should assess how logistics costs and connectivity constraints affect the competitiveness of Dominica&#39;s key productive sectors, particularly agriculture and agro-processing.</li></ul><p>&nbsp;</p><ul><li><strong>Institutional and regulatory framework:</strong>&nbsp;An assessment of the mandates, capacity, and coordination mechanisms of DASPA, Customs and Excise Division, the Ministry of Public Works (for roads), the Ministry of Finance, and other relevant agencies. This should identify key institutional gaps, overlaps, and coordination failures that the program should address, as well as the regulatory framework governing maritime services and road transport.</li></ul><p>Beyond the above dimensions, the diagnostic must also address two cross-cutting themes that are central to the Reconnect MPA:</p><ol><li><strong>Private Sector Participation (PSP) Readiness:</strong>&nbsp;An assessment of the current state and potential for private sector participation in Dominica&#39;s port and logistics sector. This should cover: existing concession or PPP arrangements (if any); the regulatory and institutional framework governing PSP; private sector interest and capacity; and the specific barriers &mdash; legal, institutional, financial, reputational &mdash; that constrain private sector engagement. Given Dominica&#39;s classification as a less-mature market, the assessment should identify the foundational reforms and institutional strengthening measures needed to create conditions for PSP over the medium term, as well as any near-term opportunities that IFC or MIGA could support.</li><li><strong>Green Logistics and Decarbonization:</strong>&nbsp;A high-level baseline assessment of the carbon footprint and energy intensity of Dominica&#39;s port and logistics operations, and an identification of priority opportunities for decarbonization &mdash; such as shore power, solar energy for port facilities, fuel-efficient vessels for inter-island services, or green logistics zone design. This should inform the inclusion of decarbonization investments in the infrastructure component of the program.</li></ol><p>The diagnostic should yield a concise, structured synthesis of findings organized around the three MPA components &mdash; Reforms, Enabling Infrastructure, and Mobilization &mdash; clearly identifying what the Dominica program should address under each component.</p><p><strong>3.2 Component 2: Dominica MPA Country Program Document</strong></p><p>Drawing on the Connectivity and Logistics Diagnostic (Component 1) and the World Bank STC technical review of the DASPA Digitalization Concept, the Consultant will produce a&nbsp;Dominica MPA Country Program Document. This is the primary output of the assignment. It must be structured explicitly around the three components of the Caribbean Reconnect MPA, and must be sufficiently detailed to serve as the basis for a World Bank lending operation targeting FY2028.</p><p>The document will cover:</p><ul><li><strong>MPA Component 1 &mdash; Reforms (National and Regional Level):&nbsp;Based on the</strong> institutional and regulatory diagnostic, the Consultant will design a reform agenda for Dominica covering: (a) the regulatory and governance framework for port operations and maritime services, including any changes needed to enable PSP; (b) trade facilitation and supply chain security reforms, including progress toward WTO TFA compliance and integration with regional single-window and harmonization initiatives; and (c) any regional-level regulatory commitments (e.g., OECS harmonization) that Dominica should advance as part of the MPA. For each reform area, the document should specify the reform action, the responsible agency, the expected timeline, and the technical assistance or capacity building support needed from the program.</li></ul><p>&nbsp;</p><ul><li><strong>MPA Component 2 &mdash; Enabling Infrastructure (National Level):</strong>&nbsp;Based on the diagnostic and the DASPA Digitalization Concept (as defined by the World Bank STC review), the Consultant will design an infrastructure investment program for Dominica covering: (a) port digitalization, structured around the government&#39;s six-component DASPA concept as technically validated by the STC review, with its own investment envelope, procurement modality, and results indicators; (b) complementary port physical infrastructure investments (where gaps are identified beyond what the digitalization program addresses), this shall include in particular priority short-term investments in Woodbridge Bay, complemented with the ToRs for a National Port Development Master Plan; (c) priority road connectivity investments linking ports to productive zones and inter-island ferry terminals; (d) inter-island maritime infrastructure (jetties, terminals, safety systems) where warranted; and (e) decarbonization investments in port and logistics operations. For each investment, the document should include an order-of-magnitude cost estimate, a proposed financing modality, and a readiness assessment.</li></ul><p>&nbsp;</p><ul><li><strong>MPA Component 3 &mdash; Mobilization:</strong>&nbsp;Based on the PSP readiness assessment, the Consultant will outline Dominica&#39;s positioning within the regional mobilization strategy of the Reconnect MPA. This section should: identify the foundational steps needed before private capital can be attracted at scale; propose a sequenced PSP roadmap for the medium term; identify any specific near-term opportunities for IFC engagement (e.g., advisory support for a port concession framework) or MIGA political risk coverage; and assess how Dominica&#39;s program can be aggregated with other Eastern Caribbean countries to form a viable regional investment corridor.</li></ul><p><strong>Cross-cutting Elements:</strong>&nbsp;In addition to the three component-specific sections, the document will:</p><ul><li>Define the program&#39;s overall development objective, theory of change, results framework, and key performance indicators &mdash; structured to reflect outcomes across all three MPA components.</li></ul><ul><li>Propose a financing strategy that combines World Bank IDA resources, climate finance instruments (given Dominica&#39;s vulnerability and the decarbonization agenda), and potential IFC/MIGA engagement, taking into account Dominica&#39;s fiscal constraints and debt situation.</li></ul><ul><li>Provide a project preparation roadmap covering: environmental and social assessment requirements; procurement planning; institutional implementation arrangements (including the role of the CSU/PIU); and the sequencing of steps needed to reach project appraisal by the FY2028 target.</li></ul><ul><li>Incorporate lessons from comparable Caribbean and SIDS programs. Aviation-related comparators are not required.</li></ul><p><strong>Validation Workshop:</strong>&nbsp;Before finalizing the Country Program Document, the Consultant will organize and facilitate a&nbsp;validation workshop&nbsp;with relevant government decision-makers and key stakeholders. The workshop will present the proposed program scope, investment priorities, reform agenda, and implementation roadmap across all three MPA components, and will seek formal endorsement of the program direction from senior government counterparts. The workshop should be held in Dominica and timed to take place after the submission of the Draft Country Program Document (D3) and before the final version (D4), so that validation feedback can be incorporated into the final document. A brief workshop report summarizing discussions, decisions, and any agreed amendments to the program scope should be submitted alongside D4. The World Bank Task Team will co-facilitate the workshop alongside the Consultant.</p><p><strong>4. Key Deliverables and Timeline</strong></p><p>The total duration of the consultancy is six (6) months from the date of contract signing. The following deliverables are expected:</p><table align=\"left\" border=\"1\"><thead><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>#</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:446px\"><p><strong>Deliverable</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:78px\"><p><strong>Due</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Payment Milestone</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>D1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:446px\"><p><strong>Inception Report Acceptance:</strong> Refined methodology, stakeholder engagement plan, work plan, and inventory of existing documents and data (including DASPA Digitalization Proposal, As-Is Analysis outputs, and World Bank STC review schedule)</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:78px\"><p>Week 3</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>10%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>D2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:446px\"><p><strong>Connectivity and Logistics Diagnostic Note Acceptance:</strong> Focused diagnostic covering Component 1 findings, organized around the three MPA components (Reforms, Enabling Infrastructure, Mobilization), including PSP readiness assessment and green logistics baseline.</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:78px\"><p>Month 3</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>30%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>D3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:446px\"><p><strong>Draft Dominica MPA Country Program Document Acceptance:</strong> Full three-component program design integrating the DASPA digitalization agenda (with STC review findings), connectivity and logistics investments, reform agenda, PSP and WBG joint engagement strategy, results framework, financing strategy, and project preparation roadmap</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:78px\"><p>Month 5</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>40%</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>D4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:446px\"><p><strong>Final Dominica MPA Country Program Document Acceptance:</strong> Incorporating all consolidated feedback from the World Bank and Government of Dominica.</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:78px\"><p>Month 6</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p>20%</p></td></tr></tbody></table><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>5. Methodology and Approach</strong></p><p>Given the budget and duration of this assignment, the Consultant is expected to adopt a focused, evidence-based methodology that maximizes the use of existing analytical work &mdash; particularly the DASPA Digitalization Conceptualization Proposal and the As-Is Business Process Analysis &mdash; rather than duplicating prior efforts. Key methodological requirements include:</p><ul><li><strong>Government Concept as the Anchor:</strong>&nbsp;The DASPA Digitalization Project Conceptualization Proposal must be the starting point and primary reference document for the entire assignment. The Consultant is expected to engage closely with DASPA from the outset to understand the government&#39;s vision and ensure the work is fully aligned with it. While the technical review of the digitalization concept is handled by World Bank STCs, the Consultant must engage with that parallel process, track its outputs, and ensure they are seamlessly integrated into the Program Framework Document.</li></ul><p>&nbsp;</p><ul><li><strong>Desk Review:</strong>&nbsp;Comprehensive review of the DASPA Digitalization Conceptualization Proposal, the As-Is Business Process Analysis outputs (as they become available), national development plans, World Bank analytical work on Dominica and the Caribbean, and relevant regional studies.</li></ul><p>&nbsp;</p><ul><li><strong>Stakeholder Consultations:</strong>&nbsp;Structured interviews with key government agencies (DASPA, Customs and Excise Division, Ministry of Finance, Ministry of Trade) and selected private sector actors. The Consultant is expected to participate in at least one multi-stakeholder validation workshop in Dominica.</li></ul><p>&nbsp;</p><ul><li><strong>In-Country Mission:</strong>&nbsp;At least one in-country mission (minimum ten working days) covering on-site visits to the Port of Roseau and Port of Portsmouth, assessment of key road corridors linking ports to productive zones, meetings with inter-island maritime service operators, and meetings with all key government and private sector counterparts. Aviation facilities and authorities are not part of the in-country mission scope.</li></ul><p>&nbsp;</p><ul><li><strong>Climate and Disaster Resilience Lens:</strong>&nbsp;All design and diagnostic work must integrate climate and disaster risk considerations, consistent with World Bank climate screening requirements.</li></ul><p>&nbsp;</p><ul><li><strong>Regional Coherence:</strong>&nbsp;Findings and recommendations must be consistent with the Caribbean Reconnect Program framework and compatible with regional digital and logistics standards being developed across participating countries.</li></ul><p>&nbsp;</p><p><strong>6.&nbsp;Required Qualifications and Experience </strong></p><p>The assignment will&nbsp;be undertaken by&nbsp;an Individual Consultant&nbsp;with demonstrated expertise&nbsp;in transport economics, logistics, and connectivity&nbsp;planning. The Consultant&nbsp;should possess the&nbsp;following qualifications&nbsp;and experience:</p><p><strong>Senior Transport and Logistics Economist / Connectivity Specialist</strong></p><p><strong><em>Minimum Qualifications and Experience</em></strong></p><ul><li>A postgraduate degree in transport economics, economics, logistics, infrastructure planning, engineering, public policy, or a related discipline.</li><li>At least 12 years of professional experience in transport sector development, logistics, trade facilitation, and/or connectivity, with a strong track record in analytical and program preparation assignments.</li><li>Demonstrated experience preparing World Bank lending operations or equivalent multilateral programs, including familiarity with results frameworks, theory of change, investment program design, financing strategies, and project preparation roadmaps.</li><li>Solid understanding of the broader transport and logistics sector &mdash; encompassing maritime port operations, road connectivity, inter-island shipping, and trade facilitation &mdash; sufficient to produce a credible multimodal connectivity diagnostic and to integrate the outputs of the World Bank STC review of the DASPA Digitalization Concept into a coherent program. Aviation expertise is not required.</li><li>Familiarity with&nbsp;private sector participation frameworks&nbsp;in the port and logistics sector, including PPP structuring, concession frameworks, and the roles of IFC and MIGA in supporting private investment in infrastructure.</li><li>Familiarity with&nbsp;green logistics and decarbonization&nbsp;concepts in the port and transport sector, sufficient to identify investment opportunities and integrate them into a program design.</li><li>Previous experience working in Small Island Developing States (SIDS) or the Caribbean region is strongly preferred. Knowledge of the OECS institutional and regulatory environment is an advantage.</li><li>Familiarity with climate-resilient infrastructure design and disaster risk management in the transport sector.</li><li>Excellent written and spoken English; strong analytical writing and communication skills.</li></ul><p><strong>7.0&nbsp;</strong><strong>Level of Effort </strong></p><p>The estimated level of effort of the assignment is <strong>approximately&nbsp;90&ndash;100 working days over a six-month period.</strong></p><p>The Consultant may propose to engage a local Dominica-based facilitator for in-country stakeholder consultations, within the overall budget envelope.</p><p><strong>8.0&nbsp;</strong><strong>Reporting and Governance</strong></p><p>The Consultant will report to the Permanent Secretary of the Ministry of Tourism, who will serve as the primary government counterpart. The Consultant will work in close collaboration with the Dominica Air and Sea Ports Authority (DASPA). The World Bank Task Team will provide technical oversight and review all deliverables.</p><p><strong>9.0&nbsp;Budget, Timing, Duration, and Logistics</strong></p><p>The estimated budget&nbsp;available for this&nbsp;assignment is up&nbsp;to USD 110,000, inclusive of all&nbsp;professional fees, travel, accommodation, subsistence, withholding tax in&nbsp;accordance with the&nbsp;laws of the&nbsp;Commonwealth of Dominica, and any other&nbsp;costs required to&nbsp;complete the assignment. The contract will&nbsp;be negotiated with&nbsp;the selected Individual&nbsp;Consultant and will&nbsp;be implemented on&nbsp;a lump sum&nbsp;basis, with payments&nbsp;made against the&nbsp;satisfactory completion&nbsp;and acceptance of&nbsp;the agreed deliverables.</p><p>The consultancy is&nbsp;expected to commence&nbsp;in&nbsp;<strong>September 2026</strong>&nbsp;and will be&nbsp;completed over a&nbsp;period of&nbsp;<strong>six (6) months</strong>. The estimated level&nbsp;of effort required&nbsp;from the Individual&nbsp;Consultant is&nbsp;approximately&nbsp;<strong>90&ndash;100 working&nbsp;days</strong>. This estimate is&nbsp;provided for planning&nbsp;purposes only and&nbsp;does not constitute&nbsp;a basis for&nbsp;payment, which will&nbsp;be made against&nbsp;accepted deliverables.</p><p>The Consultant will&nbsp;be responsible for&nbsp;arranging and&nbsp;financing all travel, accommodation, and logistics&nbsp;required for in-country missions within&nbsp;the agreed lump&nbsp;sum amount. The&nbsp;Government of Dominica, through DASPA, the&nbsp;Ministry responsible for&nbsp;Ports, the Ministry&nbsp;responsible for Infrastructure, and the Ministry&nbsp;of Finance, will&nbsp;facilitate access to&nbsp;relevant government&nbsp;counterparts, available&nbsp;data and studies&nbsp;(including the DASPA&nbsp;Digitalization Conceptualization&nbsp;Proposal), and relevant&nbsp;stakeholder networks required&nbsp;for successful completion&nbsp;of the assignment.</p><p><strong>9.0&nbsp;Confidentiality and Ownership of Information</strong></p><p>All data, analysis, and reports produced under this assignment are the property of the Government of Dominica. The Consultant shall treat all information obtained during the assignment as strictly confidential and shall not disclose it to any third party without the prior written consent of the Government. The Consultant shall declare any conflict of interest prior to commencement and throughout the assignment.</p><p><strong>10.&nbsp;Confidentiality and Ownership of Information</strong></p><p>All data, analysis, and reports produced under this assignment are the property of the Government of Dominica. The Consultant shall treat all information obtained during the assignment as strictly confidential and shall not disclose it to any third party without the prior written consent of the Government. The Consultant shall declare any conflict of interest prior to commencement and throughout the assignment.</p>"},{"id":"OP00459488","notice_type":"Request for Expression of Interest","noticedate":"29-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-13T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P180117","project_name":"Building Institutions And Systems to Harness And Realize Agenda 2063 Project","bid_reference_no":"ET-AUC-555560-CS-QCBS","bid_description":"Consulting Services to conduct a Continental Study on the State of Performance of Public Service delivery in Africa","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"Chenga-Bwalyak@AfricanUnion.org","contact_name":"Kaputo Chenga -Bwalya","contact_organization":"Africa Union Commission","contact_phone_no":"+251982168552","submission_date":"2026-07-29T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRM SELECTION)</strong></p><p>&nbsp;</p><p><strong>Country: </strong>Ethiopia</p><p><strong>Name of Project: </strong>The Building Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</p><p><strong>Grant No</strong>: P180117</p><p><strong>Assignment Title:</strong> Consulting Services to Conduct a Continental Study on the State of Performance of Public Service Delivery in Africa</p><p>&nbsp;</p><p><strong>Reference No</strong>. ET-AUC-555560-CS-QCBS</p><p>&nbsp;</p><p>The African Union Commission has received financing from the World Bank toward the cost of <em>The Building</em><em> Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</em> and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include undertaking a continental diagnostic study on the state of public service delivery in Africa to generate evidence-based knowledge that supports public administration reforms and strengthens governance systems across AU Member States.</p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.</p><p>&nbsp;</p><p>The African Union Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><p>&nbsp;</p><ul><li>At least 10-15 years of experience in governance research, institutional diagnostics, or public administration reform.</li><li>Proven experience conducting large-scale multi-country research studies or governance assessments.</li><li>Demonstrated experience working with multilateral organizations, regional institutions, or government agencies, preferably within Africa.</li><li>Strong expertise in public sector reform, governance indicators, institutional performance analysis, or civil service reform.</li><li>Demonstrated capacity to produce high-quality analytical reports and policy publications.</li><li>Experience managing multidisciplinary teams and coordinating complex research assignments across multiple countries.</li></ul><p>&nbsp;</p><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Consultants&rsquo; Quality and Cost-based Selection method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours <em>0900 to 1700 hours</em>.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>13 August 2026</strong>.</p><p>&nbsp;</p><p>African Union Commission,</p><p>Head of Supply Chain Management Division</p><p>Building C, 3rd Floor,</p><p>P.O Box 3243,<em>&nbsp;</em>Roosevelt Street</p><p>Addis Ababa, Ethiopia</p><p>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</p><p>Fax: +251 (0) 11 551 0442; +251 11-551-0430</p><p>E-mail: Tender@africanunion.org</p><p>&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>CONSULTING SERVICES TO CONDUCT A CONTINENTAL STUDY ON THE STATE OF PERFORMANCE OF PUBLIC SERVICE DELIVERY IN AFRICA</strong></p><p>&nbsp;</p><p>REF: ET-AUC-555560-CS-QCBS</p><p>&nbsp;</p><ol><li><strong>Background</strong></li></ol><p>Strong public administration systems are fundamental to state capacity, democratic governance, and the effective delivery of development outcomes. Public service institutions constitute the operational backbone of government and play a central role in translating public policies into tangible services that affect the daily lives of citizens. Across the African continent, the ability of governments to deliver inclusive development, maintain public trust, and respond to emerging crises depends significantly on the professionalism, efficiency, accountability, and performance of public service institutions.</p><p>The African Union&rsquo;s long-term development blueprint, Agenda 2063: The Africa We Want, recognizes the central role of capable public institutions in advancing sustainable development. Aspiration 3 of Agenda 2063 calls for an Africa characterized by good governance, democracy, respect for human rights, justice and the rule of law. This also aligns with Moonshot 3 of the Decade of acceleration of Agenda 2063 which states &lsquo;public institutions should be strengthened&rsquo;. Achieving this aspiration requires professional public administrations capable of implementing policies effectively, managing public resources responsibly, and delivering quality services to citizens.</p><p>To strengthen public administration systems across the continent, African Union Member States adopted the African Charter on the Values and Principles of Public Service and Administration (2011). The Charter provides a continental normative framework aimed at ensuring an efficient public sector in Africa.</p><p>The Charter further commits Member States to modernizing public administration systems, strengthening institutional capacity, and enhancing service delivery to citizens.</p><p>Despite these commitments, numerous governance assessments conducted on the continent have highlighted persistent challenges affecting the effectiveness of public service institutions in Africa. These include limited institutional capacity, fragmented administrative systems, weak performance management frameworks, insufficient monitoring mechanisms, and varying levels of transparency and accountability.</p><p>Several major continental and international studies have sought to measure governance performance across Africa. These include:</p><ul><li>The <strong>Mo Ibrahim Index of African Governance (IIAG)</strong>, which provides comparative data on governance and public service delivery[1].</li><li>The <strong>African Development Bank&rsquo;s African Governance Outlook</strong>,[2] which analyses financial governance trends across African countries.</li><li>The <strong>African Peer Review Mechanism (APRM)</strong> country reports, which identify governance challenges including weaknesses in public administration systems.[3]</li><li>The <strong>United Nations Economic Commission for Africa (UNECA) African Governance Reports</strong>, which examine institutional governance and public sector reforms.[4]</li><li>The <strong>World Bank Worldwide Governance Indicators</strong>, particularly the Government Effectiveness index.[5]</li><li>The <strong>OECD Government at a Glance framework</strong>, which provides detailed metrics for assessing public sector performance.[6]</li><li>The Chandler Good Governance Index measures the capabilities and effectiveness of 133 governments around the world based on 35 unique indicators.[7]</li></ul><p>While these initiatives provide valuable insights into governance trends, they do not offer a dedicated, systematic continental assessment focused specifically on public service performance in Africa and on the implementation of the African Charter on the Values and Principles of Public Service and Administration since its entry into force.</p><p>This gap was formally recognized during the Second Conference of State Parties (COSPII) to the African Charter on the Values and Principles of Public Service and Administration held in April 2021, where Member States highlighted the absence of reliable data on public service performance across the continent. The Conference therefore requested the African Union Commission to undertake a continental study on the State of Public Service Delivery in Africa.</p><p>The COSP sits under the auspices of the Specialized Technical Committee (STC) No. 8 on Public Service, Local Government, Urban Development and Decentralization whose aim is to strengthen governance systems and enhance the effectiveness of public administration across African Union Member States. The STC 8 receives financial support from the World Bank through the Building Institutions and Systems to Harness and Realize Agenda 2063 (BIASHARA) project which aims to promote regional integration and trade broadly. Improving governance mechanisms on the continent to enable regional trade and continental integration is also one of the key objectives of the BIASHARA Project.</p><p>This study is therefore intended to provide a comprehensive evidence-based assessment of public administration/services delivery and performance across AU Member States, including comparative analysis, benchmarking of governance practices, and identification of policy reforms necessary to strengthen public sector institutions.</p><p>The study will support the work of the Specialized Technical Committee (STC) No. 8 on Public Service, Local Government, Urban Development and Decentralization, as well as the broader governance agenda of the African Union as well as in implementation of the goals of the BIASHARA project which aims at improving good governance and regional integration on the continent.</p><ul><li><strong>II. </strong><strong>Objective of the Assignment</strong></li></ul><p>The overall objective of the assignment is to undertake a continental diagnostic study on the state of public service delivery in Africa to generate evidence-based knowledge that supports public administration reforms and strengthens governance systems across AU Member States.</p><p>The specific objectives of the assignment are to:</p><ol><li>Develop a comprehensive analytical and benchmarking framework to measure public service delivery and performance across Africa and document best practices and successful public sector reforms across African countries.</li><li>Assess the effectiveness of public service institutions and identify structural, institutional, and policy challenges affecting public administration systems across AU Member States.</li><li>Evaluate Member States&rsquo; progress in implementing the African Charter on the Values and Principles of Public Service and Administration.</li></ol><ul><li><strong>III. </strong><strong>Scope of Work </strong></li></ul><p>The consulting firm shall undertake a comprehensive continental study on the state of public service delivery covering African Union Member States. The assignment will involve the collection of primary and secondary data, analysis, synthesis, and dissemination of evidence on the functioning, effectiveness, and performance of public service institutions across the continent.</p><p>The purpose of the assignment is to generate a robust evidence base on public administration systems in Africa, identify key structural and institutional challenges affecting public service delivery, document innovative reform initiatives and best practices, and produce policy-relevant recommendations that can support public administration reforms across AU Member States.</p><ul><li><strong>IV. </strong><strong>Deliverables and Schedule for Completion of Tasks</strong></li></ul><p>The assignment is expected to commence upon signature of the consultancy contract and is anticipated to be completed within a <strong>six (6) month period</strong> from the contract start date. The consulting firm shall deliver the outputs outlined below in accordance with the agreed work plan and schedule.</p><p>The deliverables shall reflect the successful completion of the key tasks described in the Scope of Work and shall be submitted to the African Union Commission for review and approval.</p><ol><li><strong>Assignment Start Date</strong></li></ol><p>The assignment is expected to commence within Two weeks following contract signature and after the official kick-off meeting with the African Union Commission.</p><ol><li><strong>Deliverables and Timeline</strong></li></ol><p>The consulting firm will be required to produce the 3 deliverables within the duration of the assignment, and the payment will be deliverables based: -</p><p><strong>Deliverable 1:</strong> Draft Continental Study - Report including all primary and secondary data collection following the approved methodology</p><p><strong>Deliverable 2:</strong> Final Report after review of the Committee of Experts established by the African Union and World Bank</p><p><strong>Deliverable 3:</strong> Compendium of Best Practices in good governance/public sector practices</p><ol><li><strong>Review and Approval Process</strong></li></ol><p>All deliverables shall be subject to review and approval by the African Union Commission. The consulting firm shall incorporate comments and feedback provided by the Commission within an agreed timeframe before the deliverables are considered final.</p><p>Approval of each deliverable will constitute the basis for progressing to subsequent stages of the assignment and for the release of milestone payments under the consultancy contract which will be deliverable.</p><ul><li><strong>V. </strong><strong>Data, Services, and facilities to be provided by the Client: </strong></li></ul><p>To facilitate the effective implementation of the assignment, the African Union Commission (AUC) will provide the consulting firm with relevant information, documentation, and institutional support where available and applicable. The consulting firm will remain responsible for undertaking all analytical work required to complete the assignment.</p><p>The African Union Commission will provide the following support:</p><ol><li><strong>Access to Information and Documentation</strong></li></ol><p>The AUC will provide access to relevant policy frameworks, reports, and documentation that may inform the study, including but not limited to:</p><ul><li>The African Charter on the Values and Principles of Public Service and Administration</li><li>Relevant AU governance frameworks and policy instruments</li><li>Reports and documentation from the Specialized Technical Committee (STC) No. 8 on Public Service, Local Government, Urban Development and Decentralization</li><li>Existing AU studies related to governance, public administration and institutional reform</li><li>Relevant continental governance reports and publications produced by AU partners where available</li></ul><ol><li><strong>Facilitation of Institutional Engagement</strong></li></ol><p>The AUC will facilitate communication and coordination with relevant stakeholders where necessary, including:</p><ul><li>AU Member States</li><li>Regional Economic Communities (RECs)</li><li>Public service institutions and national civil service authorities</li><li>Relevant continental governance institutions and partners</li></ul><ol><li><strong>Administrative Coordination</strong></li></ol><p>The assignment will be coordinated through the Directorate for Governance and Conflict Prevention - Secretariat of the Specialized Technical Committee on Public Service, Local Government, Urban Development and Decentralization (AU-STC No. 8) within the Department of Political Affairs, Peace and Security (PAPS).</p><p>The consulting firm will be expected to work closely with the STC 8 Secretariat to ensure alignment with AU policy priorities and institutional processes.</p><ol><li><strong>Reporting Requirements</strong></li></ol><p>The consulting firm will be required to submit periodic progress reports and final outputs to the African Union Commission throughout the duration of the assignment. The African Union will have these reports evaluated by the Committee of Experts. All reports shall be submitted in English, in electronic format (Microsoft Word). Deliverables must be submitted in editable format suitable for further publication and dissemination by the African Union Commission.</p><p>&nbsp;</p><ol><li><strong>Consultant&rsquo;s Qualifications, Experience Requirements and Consultant&rsquo;s Team Composition with Estimate of Key Experts Input.</strong></li></ol><p>&nbsp;<strong>A. Firm Qualifications and Experience</strong></p><p>&nbsp;</p><p>The consulting firm (or consortium) must demonstrate strong institutional capacity and experience relevant to the assignment. The firm should meet the following minimum requirements: -</p><p>&nbsp;</p><ul><li>At least 10-15 years of experience in governance research, institutional diagnostics, or public administration reform.</li><li>Proven experience conducting large-scale multi-country research studies or governance assessments.</li><li>Demonstrated experience working with multilateral organizations, regional institutions, or government agencies, preferably within Africa.</li><li>Strong expertise in public sector reform, governance indicators, institutional performance analysis, or civil service reform.</li><li>Demonstrated capacity to produce high-quality analytical reports and policy publications.</li><li>Experience managing multidisciplinary teams and coordinating complex research assignments across multiple countries.</li></ul><p>&nbsp;</p><p><strong>B. Team Composition and Key Experts</strong></p><p>&nbsp;</p><p>The consulting firm shall propose a multidisciplinary team composed of qualified experts with demonstrated experience in governance research and public administration reform. The proposed team should collectively cover the following areas of expertise:</p><p>&nbsp;</p><ul><li>Governance and public administration</li><li>Civil service reform</li><li>Public sector performance measurement</li><li>Institutional diagnostics</li><li>Data analysis and statistics</li><li>Policy research and comparative governance analysis</li><li>Editorial and publication support</li></ul><p>&nbsp;</p><p>The consulting firm shall clearly indicate the roles and responsibilities of each team member and provide evidence of relevant experience in similar assignments.</p><p>&nbsp;</p><ol><li><strong>Assignment Management Arrangement: </strong></li></ol><p>The assignment will be managed by the Governance and Conflict Prevention Directorate (GCPD) within the Department of Political Affairs, Peace and Security (PAPS) of the African Union Commission.</p><p>&nbsp;</p><ol><li><strong>Supervisory Structure</strong></li></ol><p>The consulting firm will work in close collaboration with the Governance Expert of the Governance and Human Rights Division and report to:</p><p>&nbsp;</p><ul><li>Head of Division for Governance and Human Rights /Coordinator of the Secretariat of the Specialized Technical Committee No. 8 (STC-8)</li><li>Director, Governance and Conflict Prevention Directorate</li></ul><ol><li><strong>Review and Approval Process</strong></li></ol><p>The African Union Commission will review and approve all deliverables submitted by the consulting firm. The review process will involve:</p><p>&nbsp;</p><ol><li>Submission of deliverables by the consulting firm.</li><li>Technical review by the relevant units within the African Union Commission.</li><li>Engagement with Member States on the review of the data collected.</li><li>Provision of comments and feedback to the consulting firm.</li><li>Revision of deliverables by the consulting firm based on comments received.</li><li>Formal approval of deliverables by the African Union Commission.</li></ol><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><ol><li><strong>Contract Type </strong></li></ol><p><strong>Contract Type</strong></p><p>The assignment will be implemented under a <strong>deliverables-based Consultancy Contract</strong>, covering all professional fees and associated costs required for the completion of the assignment.</p><p><strong>Contract Duration</strong></p><p>The expected duration of the assignment is <strong>six (6) months</strong> from the date of contract signature.</p><p><strong>Assignment Location</strong></p><p>The assignment will be implemented through a combination of home-based field work (for data collection) and stakeholder consultations, which may include engagement with AU Member States and regional institutions.</p><p>&nbsp;</p><p>[1] https://iiag.online</p><p>[2] https://elibrary.acbfpact.org/acbf/collect/acbf/index/assoc/HASH01f9/ffd736c8/eb6f0eb8/8963.dir/file%200103.pdf</p><p>[3] https://aprm.au.int/en/documents/reports</p><p>[4] https://archive.uneca.org/publications/african-governance-report-v</p><p>[5] https://databank.worldbank.org/source/worldwide-governance-indicators</p><p>[6] https://www.oecd.org/en/publications/2025/06/government-at-a-glance-2025_70e14c6c.html</p><p>[7] https://chandlergovernance.com/cggi</p>"},{"id":"OP00459490","notice_type":"Request for Expression of Interest","noticedate":"29-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-13T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P180117","project_name":"Building Institutions And Systems to Harness And Realize Agenda 2063 Project","bid_reference_no":"ET-AUC-555556-CS-QCBS","bid_description":"Consulting Services to undertake a continental diagnostic study on the state of decentralisation and local governance in Africa","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"Chenga-Bwalyak@AfricanUnion.org","contact_name":"Kaputo Chenga -Bwalya","contact_organization":"Africa Union Commission","contact_phone_no":"+251982168552","submission_date":"2026-07-29T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRM SELECTION)</strong></p><p>&nbsp;</p><p><strong>Country: </strong>Ethiopia</p><p><strong>Name of Project: </strong>The Building Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</p><p><strong>Grant No</strong>: P180117</p><p><strong>Assignment Title:</strong> Consulting Services to Undertake a Continental Diagnostic Study on the State of Decentralisation and Local Governance in Africa</p><p>&nbsp;</p><p><strong>Reference No</strong>. ET-AUC-555556-CS-QCBS</p><p>&nbsp;</p><p>The African Union Commission has received financing from the World Bank toward the cost of <em>The Building</em><em> Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</em> and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include to undertaking a <strong>continental diagnostic study on the state of decentralisation and local governance in Africa</strong> in order to generate evidence-based knowledge that supports governance reforms and strengthens decentralized governance systems across AU Member States.</p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.</p><p>&nbsp;</p><p>The African Union Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><p>&nbsp;</p><ul><li>At least 10&ndash;15 years of experience in governance research, decentralisation policy, or public sector reform</li><li>Proven experience conducting multi-country comparative governance studies</li><li>Experience working / conducting studies with / for multilateral institutions or regional organisations</li><li>Demonstrated expertise in local governance, decentralisation policy, institutional diagnostics, and public administration reform</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Consultants&rsquo; Quality and Cost-based Selection method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours <em>0900 to 1700 hours</em>.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>13 August 2026</strong>.</p><p>&nbsp;</p><p>African Union Commission,</p><p>Head of Supply Chain Management Division</p><p>Building C, 3rd Floor,</p><p>P.O Box 3243,<em>&nbsp;</em>Roosevelt Street</p><p>Addis Ababa, Ethiopia</p><p>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</p><p>Fax: +251 (0) 11 551 0442; +251 11-551-0430</p><p>E-mail: Tender@africanunion.org</p><p>&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p><strong>CONSULTING SERVICES TO UNDERTAKE A CONTINENTAL DIAGNOSTIC STUDY ON THE STATE OF DECENTRALISATION AND LOCAL GOVERNANCE IN AFRICA</strong></p><p>&nbsp;</p><p>REF: ET-AUC-555556-CS-QCBS</p><p>&nbsp;</p><ul><li><strong>I. </strong><strong>Background</strong></li></ul><p>Decentralisation and local governance are central components of democratic governance, public sector reform, and sustainable development across the African continent. By bringing government closer to citizens, decentralisation strengthens accountability, improves service delivery, promotes participatory governance, and supports inclusive development at the local level.</p><p>Recognising the importance of decentralised governance, the Heads of State and Government of the African Union adopted the <strong>African Charter on the Values and Principles of Decentralisation, Local Governance and Local Development</strong> in Malabo, Equatorial Guinea, in June 2014. The Charter establishes a continental normative framework aimed at promoting democratic decentralisation, strengthening local authorities, and enhancing citizen participation in governance processes.</p><p>The Charter also aligns with the aspirations of <strong>Agenda 2063: The Africa We Want</strong>, particularly Aspiration 3, which calls for an Africa characterised by good governance, democracy, respect for human rights, justice, and the rule of law. Effective decentralisation systems are critical for achieving these goals by strengthening governance at sub-national levels and enabling local governments to contribute to development and service delivery.</p><p>Despite significant efforts undertaken by many African countries to advance decentralisation reforms, the design, scope, and effectiveness of decentralisation systems vary widely across the continent. Different models have been adopted, including devolution, delegation, and deconcentration. In many cases, decentralisation reforms face challenges related to limited fiscal autonomy, unclear legal frameworks, institutional capacity constraints, and weak coordination between central and local government structures.</p><p>After the adoption of the Charter by Heads of States in 2014, the African Union established a Specialized Technical Committee on Public Service, Local Government, Urban Development and Decentralization (AU-STC.No.8). The Committee which comprises of Ministers, Senior Government Officials responsible for Public Service, Decentralization, Local Governance and Urban Development, operates under the authority of the Executive Council, and it is tasked with preparing projects, supervising implementation, coordinating programmes and submitting recommendations to the African Union Policy Organs. The Committee is organised into three (3 sub committees) being i)<strong> </strong>Public Service &amp; Administration, ii) Decentralisation &amp; Local Governance and iii) Urban Development &amp; Human Settlements.<strong>&nbsp;&nbsp; </strong></p><p>The AU-STC.No.8 Sub-Committee on Decentralisation and Local Governance is the main consultative body charged with the responsibility of promoting and enhancing local governance at Sub National Level across the Continent by;</p><ul><li>Supporting decentralisation policies and reforms that empower Local Governments to deliver public services more effectively</li><li>Improving local governance structures, promoting transparency, accountability, inclusivity and responsiveness to citizen needs.</li><li>Guiding the African Union Member States in structuring institutional frameworks that anchor local autonomy, strengthen capacities and foster community-driven development.</li></ul><p>At its Fifth Ordinary Session held in Tunisia in December 2024, the <strong>STC-8 Sub-Committee on Decentralisation and Local Governance</strong> requested the African Union Commission to undertake a continental assessment of the state of decentralisation in Africa in order to better understand the progress made, identify key challenges, and promote policy learning among Member States.</p><p>In response to this request, and as part of the implementation of the World Bank Funded - Building Institutions and Systems to Harness and Realize Agenda 2063 (BIASHARA) project objectives in terms of supporting the work of the STC no 8, the African Union Commission intends to undertake a <strong>continental study on the State of Decentralisation and Local Governance in Africa</strong><strong>.</strong> The study will generate evidence-based knowledge on decentralisation systems across AU Member States, assess progress in implementing the African Charter on Decentralisation, identify challenges and best practices and reform innovations, and provide policy recommendations to strengthen decentralised governance across the continent.</p><p>Given the scale and complexity of this assignment, the African Union Commission intends to recruit a <strong>qualified consulting firm with demonstrated expertise in governance research, decentralisation policy, public administration reform, and comparative institutional analysis</strong><strong>.</strong></p><p>&nbsp;</p><ul><li><strong>II. </strong><strong>Objective of the Assignment</strong></li></ul><p>The overall objective of the assignment is to undertake a <strong>continental diagnostic study on the state of decentralisation and local governance in Africa</strong> in order to generate evidence-based knowledge that supports governance reforms and strengthens decentralized governance systems across AU Member States.</p><p>The specific objectives of the assignment are to:</p><ol><li>Develop a comprehensive analytical framework to assess the legal, political, administrative, and fiscal dimensions of decentralisation systems across African Union Member States.</li><li>Identify structural, institutional, and governance challenges affecting decentralisation processes in AU Member States, while documenting innovative practices and successful local governance reforms across the continent.</li><li>Formulate evidence-based policy recommendations to strengthen decentralisation systems, enhance local governance, and support sustainable governance reforms in Africa.</li></ol><ul><li><strong>III. </strong><strong>Scope of Work </strong></li></ul><p>The consulting firm will undertake a comprehensive continental study covering African Union Member States. The assignment will involve the collection of primary and secondary data, analysis, synthesis, and dissemination of evidence on decentralisation systems and local governance frameworks across the continent.</p><p>The consulting firm will be expected to carry out, at a minimum, the following tasks:</p><ul><li><strong>Deliverable 1: Draft Continental Assessment Report on Decentralisation in Africa</strong></li></ul><p>The firm shall prepare and submit a comprehensive draft report presenting the findings of the continental assessment. It will include Continental Mapping and Institutional Analysis of Decentralisation including primary and secondary data collection and be a comprehensive analytical report mapping the decentralisation systems across all African Union Member States. This deliverable will document the legal, political, administrative, and fiscal dimensions of decentralisation across the continent and analyse the institutional arrangements governing decentralised governance and local authorities. The draft report shall include comparative analysis, identification of decentralisation trends, documentation of innovative governance practices, and an assessment of the effectiveness of decentralisation reforms across AU Member States.</p><ul><li><strong>Deliverable 2: Final Continental Report on the State of Decentralisation in Africa</strong></li></ul><p>Following stakeholder consultations and validation of findings including review by the Committee of Experts, the firm shall submit the final analytical report incorporating feedback received from the African Union Commission and relevant stakeholders. The final report will provide evidence-based analysis of decentralisation processes across Africa and propose strategic policy recommendations to strengthen decentralised governance systems.</p><ul><li><strong>Deliverable 3: Compendium of Best Practices in Decentralised Governance</strong></li></ul><p>The firm shall prepare a user-friendly publication documenting successful decentralisation initiatives, innovative governance practices, and reform models implemented across AU Member States. The compendium will serve as a knowledge-sharing resource to facilitate peer learning and the exchange of experiences among Member States.</p><ul><li><strong>IV. </strong><strong>Deliverables and Schedule for Completion of Tasks</strong></li></ul><p>The assignment is expected to be completed within <strong>six (6) months</strong> after signature of the contract. The payment will be deliverables based.</p><ul><li><strong>V. </strong><strong>Data, Services, and facilities to be provided by the Client: </strong></li></ul><p>&nbsp;</p><p>The African Union Commission will provide access to relevant documentation including:</p><p>&nbsp;</p><ul><li>African Charter on Decentralisation</li><li>STC-8 reports and documentation</li><li>AU governance frameworks</li><li>Relevant continental governance studies</li></ul><p>&nbsp;</p><p>Where necessary, the Commission will also facilitate engagement with:</p><p>&nbsp;</p><ul><li>AU Member States</li><li>Regional Economic Communities (RECs)</li><li>Local governance institutions and networks.</li></ul><p>&nbsp;</p><ol><li><strong>Reporting Requirements</strong></li></ol><p>The assignment will be managed by the Governance and Conflict Prevention Directorate (GCPD) within the Department of Political Affairs, Peace and Security.</p><p>&nbsp;</p><p>The consulting firm will report to:</p><p>&nbsp;</p><ul><li>Coordinator of the STC-8 Secretariat</li><li>Director of the Governance and Conflict Prevention Directorate.</li></ul><p>&nbsp;</p><p>All deliverables will be subject to review and approval by the African Union Commission.</p><p>&nbsp;</p><ol><li><strong>Consultant&rsquo;s Qualifications, Experience Requirements and Consultant&rsquo;s Team Composition with Estimate of Key Experts Input.</strong></li></ol><p>&nbsp;</p><ol><li><strong>&nbsp;The consulting firm should demonstrate the following:</strong></li></ol><p>&nbsp;</p><ul><li>At least 10&ndash;15 years of experience in governance research, decentralisation policy, or public sector reform</li><li>Proven experience conducting multi-country comparative governance studies</li><li>Experience working / conducting studies with / for multilateral institutions or regional organisations</li><li>Demonstrated expertise in local governance, decentralisation policy, institutional diagnostics, and public administration reform</li></ul><p>&nbsp;</p><ol><li><strong>The firm should propose a multidisciplinary team covering expertise in:</strong></li></ol><p>&nbsp;</p><ul><li>Decentralisation and local governance</li><li>Public administration and institutional reform</li><li>Governance indicators and data analysis</li><li>Policy research and comparative governance.</li></ul><p>&nbsp;</p><ol><li><strong>Assignment Management Arrangement: </strong></li></ol><p>The assignment will be managed by the Governance and Conflict Prevention Directorate (GCPD) within the Department of Political Affairs, Peace and Security (PAPS) of the African Union Commission.</p><p>&nbsp;</p><p><strong>Supervisory Structure</strong></p><p>&nbsp;</p><p>The consulting firm will report to:</p><p>&nbsp;</p><ul><li>Head of Division Governance and Human Rights,&nbsp; Coordinator of the Secretariat of the Specialised Technical Committee No. 8 (STC-8)</li><li>Director, Governance and Conflict Prevention Directorate</li></ul><p><strong>Review and Approval Process</strong></p><p>&nbsp;</p><p>The African Union Commission will review and approve all deliverables submitted by the consulting firm.</p><p>The review process will involve:</p><p>&nbsp;</p><ol><li>Submission of deliverables by the consulting firm.</li><li>Technical review by the relevant units within the African Union Commission.</li><li>Experts review by the Committee of Experts on Decentralisation</li><li>Engagement with Member States on the review of the data collected.</li><li>Provision of comments and feedback to the consulting firm.</li><li>Revision of deliverables by the consulting firm based on comments received.</li><li>Formal approval of deliverables by the African Union Commission.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Contract Type and Other Information:</strong></li></ol><p><strong>Contract Type</strong></p><p>&nbsp;</p><p>The assignment will be implemented under a <strong>deliverables-based Consultancy Contract</strong>, covering all professional fees and associated costs required for the completion of the assignment.</p><p>&nbsp;</p><p><strong>Contract Duration</strong></p><p>&nbsp;</p><p>The expected duration of the assignment is <strong>six (6) months</strong> from the date of contract signature.</p><p>&nbsp;</p><p><strong>Assignment Location</strong></p><p>The assignment will be implemented through a combination of home-based field work (for data collection) and stakeholder consultations, which may include engagement with AU Member States and regional institutions.</p><p>&nbsp;</p><p><strong>Expected Start Date</strong></p><p>&nbsp;</p><p>The assignment is expected to commence within two weeks following contract signature.</p><p>&nbsp;</p><p>&nbsp;</p>"}]}