{"rows":20,"os":"0","page":"1","total":"23","procnotices":[{"id":"OP00442683","notice_type":"Request for Expression of Interest","noticedate":"04-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-05-20T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Egypt, Arab Republic of","project_id":"P172548","project_name":"Greater Cairo Air Pollution Management and Climate Change Project","bid_reference_no":"EG-EEAA-544823-CS-QCBS","bid_description":"Task 1: Engineering Consultant services for the preparation of the detailed design and engineering package for Ameriyah depot administrative buildings rehabilitation and;\nTask 2: Full site supervision services for both Ameriyah depot & Admin Bldgs","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"15 C El Tawfik Bldg, Fostat, Old Cairo","contact_ctry_name":"Egypt, Arab Republic of","contact_email":"mohamed.hassan@gccceg.com","contact_name":"Mohamed Hassan","contact_organization":"Egyptian Environmental Affairs Agency","contact_phone_no":"01128333019","submission_date":"2026-05-04T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST&nbsp;</strong></p>\n\n<p><strong>CONSULTING SERVICES&nbsp;</strong></p>\n\n<p>Arab Republic of Egypt&nbsp;</p>\n\n<p>GREATER CAIRO AIR POLLUTION MANAGEMENT AND CLIMATE CHANGE &ldquo;GCCC&rdquo; PROJECT - PROJECT (P172548)&nbsp;</p>\n\n<p><strong>Engineering Consultant firm, to prepare the detailed design, engineering package for Ameriyah depot administrative buildings rehabilitation and full site supervision for the depot retrofitting &mdash; Issued in Two Separate Contracts &mdash;</strong></p>\n\n<p><strong>Reference No. (as per Procurement Plan): </strong><strong>EG-EEAA-544823-CS-QCBS </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;&nbsp;I.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Background</strong></p>\n\n<p>As part of the &ldquo;Sustainable Development Strategy (SDS): Egypt Vision 2030&rdquo; the country committed to halving its fine particulate matter (PM10) air pollution by 2030. Significant improvements have been made towards that goal in recent years. In fact, Cairo&rsquo;s PM10 concentration fell by about 25 percent over the past decade. Despite these improvements, the city&rsquo;s pollution levels are still several times the WHO recommended concentrations and higher than national guidelines taking as these high levels are taking their toll on the health and quality of life of the population, in particular poor people.</p>\n\n<p>In response to this situation, the approved World Bank-financed Greater Cairo Air Pollution Management and Climate Change Project aims at reducing air emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The Project aims more specifically at reducing air emissions which is a key step toward the reduction of pollution concentrations and improvement of air quality. The Project will focus on the two main sources of air pollution: open burning of solid waste and vehicle emissions and will geographically cover Greater Cairo (i.e., Cairo, Giza and Qalyoubia Governorates --GC); and will include four main components aiming at: (i) enhancing the air quality decision support system in Egypt; (ii) improving Solid Waste Management services; (iii) reducing air and climate pollutants from vehicle emissions; and (iv) furthering stakeholder engagement, awareness and communication.</p>\n\n<p>&nbsp;</p>\n\n<p>Component 3 Vehicle Emission Reduction</p>\n\n<p>Under this component, the Project will support activities aimed at reducing vehicle emissions from the public transport sector. 100 electric buses and the equipment required to operate and maintain these buses are procured. To integrate the electric buses, the project will retrofit existing bus depots with charging stations, upgraded power supply, and safety equipment. The activities will support the Cairo Transport Authority (CTA), which will operate the electric buses. The Project will upgrade facilities at CTA, including the retrofitting of existing bus depots with electric charging stations, power supply and related safety equipment; training CTA staff such as bus drivers and mechanics on operating and maintaining the new e-equipment. The Ministry of Environment, through the Egyptian Environmental Affairs Agency (EEAA), is the project&rsquo;s borrower, while CTA is the beneficiary responsible for implementation. By investing in e-bus technology, modernizing infrastructure, and strengthening operational capacity, this component plays a key role in Egypt&rsquo;s green transport transition, reducing emissions and setting a model for future urban mobility.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>II. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Assignment Description</strong></p>\n\n<p>The Depot retrofitting tender is issued with all depot drawings and details that will be made available in the RFP that will be sent only to the shortlisted firms. The requested services covered by these terms of reference are to support the Project Coordination Unit (PCU) and the Technical Implementation Units (TIUs) of &ldquo;Greater Cairo Air Pollution Management and Climate Change &ldquo;GCCC&rdquo; Project&rdquo; in the implementation of the following two contracts services:</p>\n\n<p><strong><u>Contract 1: Detailed Design and Engineering Package for the Administrative Buildings Rehabilitation (Lump-Sum):</u></strong><strong> </strong>Preparation of detailed design and engineering package for the rehabilitation of Ameriyah depot administrative buildings, including drawings, technical specifications, cost estimates, and tender documents.</p>\n\n<p><strong>Expected Duration: approximately 55 working days. </strong>The assignment covers all engineering disciplines required for the rehabilitation of the administrative buildings, including architectural, structural, MEP, Telecom/LC systems, EHS, and social considerations, and concludes with a full set of tender-ready documents.</p>\n\n<p><strong><u>Contract 2: Design Review of Depot Retrofitting and Full Site Supervision (Time-Based):</u></strong><strong> </strong>Full site supervision of depot retrofitting works and administrative building rehabilitation, including contract administration, quality control, environmental and social monitoring, and design review of depot-related works.</p>\n\n<p>This contract comprises three tasks: <strong>Task 1 &mdash; Design Review</strong> (3 weeks): multi-discipline review and verification of the completed depot retrofitting design; <strong>Task 2 &mdash; Full Site Supervision</strong> (14 months): comprehensive on-site supervision of all depot retrofitting and administrative buildings rehabilitation works; <strong>Task 3 &mdash; Bid Evaluation Support</strong> (2 weeks = 10 working days): technical support to the Client during evaluation of admin buildings works bids.</p>\n\n<p><strong>Total Expected Duration: approximately 15 months and 1 week</strong></p>\n\n<p><strong>III.</strong> &nbsp;&nbsp;&nbsp;&nbsp; <strong>Packaging and Evaluation of Contracts</strong></p>\n\n<p>The assignment is divided into two (2) separate contracts. The Client intends to apply a split award approach, whereby:</p>\n\n<ul>\n\t<li>Each contract (Contract 1 and Contract 2) will be evaluated and awarded separately;</li>\n\t<li>Interested firms may express interest in one or both contracts;</li>\n\t<li>Shortlisting, request for proposals, evaluation, and contract award will be conducted independently for each contract;</li>\n\t<li>The Client reserves the right to award one or both contracts to the same firm or to different firms, based on the outcome of the respective evaluations.</li>\n</ul>\n\n<p>Consultants expressing interest in both contracts shall clearly indicate their interest and demonstrate relevant qualifications for each contract separately.</p>\n\n<p>Interested firms should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services for the <strong>specific contract(s)</strong> they are applying for.</p>\n\n<p><strong>IV. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Qualification Requirements</strong></p>\n\n<p>The Ministry of Environment now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services.</p>\n\n<p>Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services, including:</p>\n\n<p>The shortlisting criteria is:</p>\n\n<p><strong>Contract 1:</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:37px\">\n\t\t\t<p>#</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:472px\">\n\t\t\t<p>Shortlisting criteria</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; vertical-align:top; width:139px\">\n\t\t\t<p>Percentage</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:99px; vertical-align:top; width:37px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:99px; vertical-align:top; width:472px\">\n\t\t\t<table>\n\t\t\t\t<tbody>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td style=\"width:620px\">&nbsp;</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</tbody>\n\t\t\t</table>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>General experience of the firm in engineering consultancy, particularly in the preparation of detailed engineering designs for rehabilitation of administrative buildings and/or transport infrastructure such as bus depots or parking facilities (minimum of 5 similar completed projects).</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:99px; width:139px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:124px; vertical-align:top; width:37px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:124px; vertical-align:top; width:472px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>The Consultancy firm is expected to have a minimum of 5&ndash;7 years of experience in preparation of detailed technical and engineering designs. Similar projects should involve the rehabilitation of multi-story buildings and/or transport infrastructure. Experience with World Bank-financed projects is an advantage.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:124px; width:139px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:94px; vertical-align:top; width:37px\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:94px; vertical-align:top; width:472px\">\n\t\t\t<p>Key staff are expected to have extensive experience in managing similar engineering design projects, covering architectural, structural, MEP, Telecom/LC, and EHS disciplines. The team should include specialists in design, cost estimation, environmental and social safeguards, and Telecom/LC systems, with demonstrated experience in at least 3 similar projects each.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:94px; width:139px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Minimum % for qualification: 75 %&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contract 2: </strong></p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:40px\">\n\t\t\t<p><strong>#</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:427px\">\n\t\t\t<p><strong>Shortlisting criteria</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:127px\">\n\t\t\t<p><strong>Percentage</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:40px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:427px\">\n\t\t\t<p>General experience of the firm in engineering consultancy, particularly in site supervision of building rehabilitation and/or transport infrastructure projects such as bus depots, parking facilities, or similar structures (minimum of 5 similar completed projects). Experience with design review and ESHS supervision is an advantage.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:127px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:40px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:427px\">\n\t\t\t<p>The Consultancy firm is expected to have a minimum of 5&ndash;7 years of experience in full site supervision of construction or rehabilitation projects. Similar projects should involve multi-story administrative buildings and/or transport infrastructure such as bus depots or parking facilities. Experience in ESHS supervision and design review is an advantage. Experience with World Bank-financed projects is preferred.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:127px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:40px\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:427px\">\n\t\t\t<p>Key staff are expected to have extensive experience in managing and supervising similar construction or rehabilitation projects. The proposed team should include specialists covering civil/structural, electrical, mechanical, architectural, Telecom/LC systems, EHS, and social and gender disciplines, with demonstrated leadership and coordination capabilities.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:127px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Minimum % for qualification: 75%</p>\n\n<p>&nbsp;</p>\n\n<p>The Consulting Firm(s) will be selected in accordance with the Request for Proposal with the Quality and Cost -Based Selection - QCBS method&quot; set out in the Procurement Regulations&rdquo;.&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours 09:00 to 16:00.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be sent by e-mail not later than <strong>May 20th. 2026 at 14:00 (CLT)</strong>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Greater Cairo Air Pollution Management and Climate Change &ldquo;GCCC&rdquo; Project</p>\n\n<p>Attn: Dr. Mohamed Hassan, Project Coordinator and Ms. Heba Elkarkari, Procurement Consultant&nbsp;</p>\n\n<p>Address: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 15 S El Tawfik Building, El Fustat El Gedida,&nbsp;</p>\n\n<p>Old Cairo, Cairo - Egypt&nbsp;</p>\n\n<p>Tel: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; +20 1128333019&nbsp;</p>\n\n<p>E-mail: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; mohamed.hassan@gccceg.com</p>\n\n<p>E-mail: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; heba.elkarkari@gccceg.com&nbsp;</p>\n\n<p>The detailed Terms of Reference &ldquo;TOR&rdquo; including the scope of work and deliverables for the assignment is found below.&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE &ldquo;TOR&rdquo; </strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Engineering Consultant Services for Ameriyah Depot &mdash; Issued in Two separate Contracts:</strong></p>\n\n<p><strong>Contract 1: Detailed Design and Engineering Package for the Administrative Buildings Rehabilitation (Lump-Sum)</strong></p>\n\n<p><strong>Contract 2: Design Review of Depot Retrofitting and Full Site Supervision (Time-Based)</strong></p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;I.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Background</strong></p>\n\n<p>1.&nbsp; &nbsp; &nbsp; As part of the &ldquo;Sustainable Development Strategy (SDS): Egypt Vision 2030&rdquo;,[1]http://www.greengrowthknowledge.org/national-documents/sustainable-development-strategy-egypt-vision-2030 the country committed to halving its fine particulate matter (PM10) air pollution by 2030. Significant improvements have been made towards that goal in recent years. In fact, Cairo&rsquo;s PM10 concentration fell by about 25 percent over the past decade. Despite these improvements, the city&rsquo;s pollution levels are still several times the WHO recommended concentrations and higher than national guidelines taking as these high levels are taking their toll on the health and quality of life of the population, in particular poor people.</p>\n\n<p>2.&nbsp; &nbsp; &nbsp; In response to this situation, the approved World Bank-financed Greater Cairo Air Pollution Management and Climate Change Project aims at reducing air emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The Project aims more specifically at reducing air emissions which is a key step toward the reduction of pollution concentrations and improvement of air quality. The Project will focus on the two main sources of air pollution: open burning of solid waste and vehicle emissions and will geographically cover Greater Cairo (i.e., Cairo, Giza and Qalyoubia Governorates --GC); and will include four main components aiming at: (i) enhancing the air quality decision support system in Egypt; (ii) improving Solid Waste Management services; (iii) reducing air and climate pollutants from vehicle emissions; and (iv) furthering stakeholder engagement, awareness and communication.</p>\n\n<p>3.&nbsp; &nbsp; &nbsp; The Project is composed of the following components:</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Component 1: Enhancing the Air Quality Management (AQM) &amp; Response System</strong></p>\n\n<p>This component will support the enhancement of the Air Quality Management (AQM) decision support system in GC through a strengthened AQM infrastructure (monitoring and analytical), capacity buildings activities, developing emergency response plans and raising public awareness through information dissemination.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Component 2: Support the operationalization of SWM Master Plans in GC</strong></p>\n\n<p>This component aims to support operationalization of the Governorate SWM master plans, which lay down the full range of necessary actions and investments needed for each governorate to improve solid waste management services in accordance with the specificity of each Governorate. In view of the complexity and magnitude of SWM system in GC, a phased and gradual approach is being proposed to achieve tangible results on the ground. This approach involves providing technical support at the central level such as the Qalyoubia Governorate, the Waste Management Regulatory Authority and the Ministry of Local Development on the technical, financial and project development aspects of solid waste management.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Component 3: Vehicle Emission Reduction</strong></p>\n\n<p>Under this component, the Project will support activities aimed at reducing vehicle emissions from public transport sector. Approximately 100 electric buses and the equipment required to operate and maintain these buses will be procured. To integrate the electric buses, the project will retrofit existing bus depots with charging stations, upgraded power supply, and safety equipment. The activities will support the Cairo Transport Authority (CTA), which will operate the electric buses. The Project will upgrade facilities at CTA, including the retrofitting of existing bus depots with electric charging stations, power supply and related safety equipment; training CTA staff such as bus drivers and mechanics on operating and maintaining the new e-equipment. The Ministry of Environment, through the Egyptian Environmental Affairs Agency (EEAA), is the project&rsquo;s borrower, while CTA is the beneficiary responsible for implementation. By investing in e-bus technology, modernizing infrastructure, and strengthening operational capacity, this component plays a key role in Egypt&rsquo;s green transport transition, reducing emissions and setting a model for future urban mobility.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Component 4:</strong> <strong>Communication &amp; Stakeholders Engagement</strong></p>\n\n<p>This component aims at ensuring that all stakeholders, in an inclusive manner, are actively involved in the design, implementation and monitoring of all Project activities and that the Project is implemented following a full consultative participatory approach that is meant to build a constructive relationship between the stakeholders and the Government of Egypt (GoE). The component is complementary to the comprehensive plan for engaging with stakeholders as part of the environmental and social risk management and the Stakeholders Engagement Plan (SEP).</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Component 5:</strong> <strong>Project Management and Monitoring &amp; Evaluation</strong></p>\n\n<p>This component will support the establishment of Project Coordination Unit (PCU) at the Ministry of Environment (MoE) and four Technical Implementation Units (TIU) for each of first four components.</p>\n\n<p>1.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; A Project Coordination Unit (PCU) ensures that the Project is implemented in accordance with the Legal Agreement signed between the GoE and the World Bank, the Project Appraisal Document (PAD), the Project Implementation Manuals (Project Operational Manual, M&amp;E Manual, etc.)</p>\n\n<p>&nbsp;</p>\n\n<p>2.&nbsp; &nbsp; &nbsp; Four Technical Implementation Units (TIUs) oversee the implementation of Components 1, 2, 3 and 4 in co-ordination with other relevant agencies. The PCU is responsible for &ldquo;Component 5: Project Management and Monitoring &amp; Evaluation&rdquo;.</p>\n\n<p>&nbsp;</p>\n\n<p>To carry out its Project-wide duties, the PCU has the responsibility to prepare the Project&#39;s overall Annual Work Plans and Budgets on the basis of plans prepared by each TIU, to manage procurement for the different Project beneficiaries, to coordinate monitoring and evaluation activities with the other executing agencies, to ensure compliance with the Environmental and Social Framework of the World Bank and to provide support to counterpart institutions in the implementation of activities.</p>\n\n<p>&nbsp;<strong>Component 6: </strong>Improved Management of E-Waste and Healthcare Waste for the Reduction of uPOPs Emissions</p>\n\n<p>&nbsp;</p>\n\n<p><strong>II.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Objective of the Assignment</strong></p>\n\n<p>In the context of the component 3, the Project is seeking the services of a design and supervision engineering firm, referred to thereafter as &ldquo;the Consultant&rdquo;, to prepare the detailed engineering design package, including the technical specifications, and the bidding documents for the administrative buildings, and to support the client in technical aspects during the evaluation of the bids. Also, the consultant will fully supervise the entire Ameriyah depot retrofitting works (the depot and the accompanying administrative buildings) to support the Project in delivering the works efficiently.</p>\n\n<p>This project is to upgrade the existing administrative buildings (maintaining the current work capacity) to match the state-of-the-art electric bus technologies and represent the ambitious vision of&nbsp;the Egyptian people for a green transition. The consultancy service aims to mitigate risks emerging from separately designing the depot and the administrative buildings, and; comply with rules and regulations applicable to the Government of Egypt investment projects and to the World Bank-financed investment projects, including the Environmental and Social Framework (ESF) instruments of the project and Procurement Regulations.</p>\n\n<p>The rehabilitation of the administrative buildings will upgrade and modernize existing infrastructure while maintaining the current functional capacity. The number of personnel working in the administrative buildings will remain unchanged, and the existing organizational structure of CTA will be preserved. The project will ensure that the allocation of office space, work areas, and support facilities aligns with current operational needs, without altering the fundamental layout or intended use of the administrative buildings.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;III.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Scope of Work</strong></p>\n\n<p>The Consultant will undertake the following tasks, and as detailed below:</p>\n\n<p><strong><u>Contract 1:</u></strong> comprises the following details:</p>\n\n<p>Deliver a comprehensive engineering design, including detailed specifications, bill of quantities (BOQ), cost estimates and implementation plan &amp; timeline, and prepare the technical specifications and the tender documents for the rehabilitation of the administrative buildings. This will cover replacing old systems of water, wastewater, and electricity connections, both around and within the administrative buildings. The Consultant shall review relevant documents, drawings, and data and consult with the Client and stakeholders to fully understand project requirements, preferences, and budget constraints. The Client will facilitate access to these materials and the project site(s) as needed. The Consultant shall also coordinate with relevant authorities to secure approvals for tie-in connections between the administrative buildings infrastructure and surrounding utility networks. To support the procurement process, CTA will grant access to bidders and the selected vendor during both the tender and implementation phases. Appendix 1 lists available documents&mdash;including existing drawings, BOQ, and depot retrofitting designs from the ongoing detailed design study, with confidential access granted to the consultants (bidders), preliminary BOQ for the planned administrative buildings retrofitting. The detailed engineering design for the depot retrofitting works (excluding the administrative buildings) has already been completed under a separate consultancy assignment, and this assignment does not include design responsibilities for the depot. The Consultant&rsquo;s design responsibilities are limited solely to the rehabilitation of the administrative buildings located within the Ameriya Depot. However, the Consultant shall ensure that the administrative buildings design is functionally and spatially integrated with the existing depot retrofitting design. To facilitate this, relevant depot design documents&mdash;including layout plans and Bills of Quantities (BOQs)&mdash;are provided in Appendix1.</p>\n\n<p>The Consultant shall take into account specific design measures to avoid or minimize the environmental, social and health and safety risks and impacts associated with the administrative buildings rehabilitation activities, in accordance with the World Bank Environmental and Social Standards[2] and WBG Environmental, Health and Safety General Guidelines[3], as technically and financially feasible. The Consultant will develop a detailed health and safety risk assessment to identify potential hazards and integrate appropriate safety measures, including those for electrical, mechanical, and structural works, into the design.</p>\n\n<p>The Consultant will also ensure that the engineering design aligns with the World Bank&rsquo;s Environmental and Social Safeguard Policies, particularly ESS 1 (Assessment and Management of Environmental and Social Risks and Impacts), ESS2 (Labor and Working Conditions), ESS 3 (Resource Efficiency and Pollution Prevention), and ESS 4 (Community Health and Safety), ESS 10 (Stakeholder Engagement and Information Disclosure).</p>\n\n<p>&nbsp;</p>\n\n<p><strong><u>Contract 2:</u></strong> Comprises of 3 tasks.</p>\n\n<p><strong><u>Task 1:</u></strong> The Consultant shall conduct a comprehensive review and verification of the depot retrofitting design documents prepared under the separate design consultancy. This design review shall commence immediately upon contract signing and shall run in parallel with the Contract 1 administrative buildings design.</p>\n\n<p><em>If both contracts are awarded to the same firm, this parallel execution expects the Consultant to identify integration requirements between the depot design and the administrative buildings design being developed under Contract 1. </em></p>\n\n<p><em>If both contracts are awarded to different firms, the Contract 2 Consultant shall incorporate the design review findings with the Contract 1 Consultant, who shall be responsible for ensuring that any depot design modifications arising from the review are properly communicated and integrated.</em></p>\n\n<p>The design review shall cover the following disciplines:</p>\n\n<ol>\n\t<li>Structural: Structural calculations, reinforcement details, foundation design, load assumptions, and compliance with Egyptian structural codes and World Bank requirements.</li>\n\t<li>Electrical (Heavy Current): Power distribution, transformer sizing, generator capacity, UPS, lighting, lightning protection, surge protection, and cable sizing per Egyptian Distribution Code.</li>\n\t<li>Mechanical: HVAC system sizing and zoning, plumbing network, and firefighting system compliance with NFPA and Egyptian Fire Code 801.</li>\n\t<li>Architectural: Space planning, accessibility, finishing specifications, universal and gender-sensitive design, and structural/MEP coordination.</li>\n\t<li>Civil/Infrastructure: Site works, underground utilities, access roads, drainage, temporary works, and construction phasing for operational continuity.</li>\n\t<li>Telecom/LC: Structured cabling (TIA/EIA-568), CCTV coverage, fire detection and alarm (BS/EN 54), parking control, data communications, and system integration requirements.</li>\n\t<li>EHS: ESMP adequacy, OHS provisions, environmental mitigation measures, and WB ESF compliance (ESS1&ndash;ESS4).</li>\n\t<li>Social: Stakeholder engagement provisions, accessibility, community impact mitigation, and SEP/ESS10 alignment.</li>\n</ol>\n\n<p>The design review shall be substantially complete within the first three (3) weeks of the assignment. All critical findings shall be communicated to the Client within 48 hours of identification. All critical and major findings must be resolved prior to construction commencement. The Contract 2 Consultant shall be responsible for implementing and verifying the corrective actions arising from the design review, coordinating with the original design consultant and the contractor as needed. The Design Review Report and Corrective Action Register shall serve as reference documents throughout the supervision phase.</p>\n\n<p><strong><u>Task 2:</u></strong> The Consultant will be responsible for the comprehensive site supervision services during the depot retrofitting and administrative buildings rehabilitation works and equipment installation including e-bus chargers. This includes overseeing the construction activities in both the depot and its accompanying administrative buildings to ensure compliance with the approved design, technical specifications, project schedule, and the implementation of the ESHS requirements. The supervision responsibilities include:</p>\n\n<ol>\n\t<li>Review and approve contractor shop drawings, product data, manufacturer certifications, and method statements for all subsystems.</li>\n\t<li>Supervise installation ensuring compliance with approved drawings, manufacturer guidelines, and applicable standards.</li>\n\t<li>Witness and certify all testing and commissioning for all disciplines including cable certification, CCTV coverage verification, fire alarm zone testing, network performance testing, parking control functional testing, and integrated system acceptance testing.</li>\n\t<li>Review contractor O&amp;M manuals, as-built drawings, and training programs for all subsystem prior to handover.</li>\n\t<li>Coordinate with the Electrical Engineer (heavy current) on power supply, cable tray sharing, grounding/earthing, and UPS backup requirements.</li>\n\t<li>Verify proper system integration between all subsystems in the depot and the administrative buildings.</li>\n</ol>\n\n<p>The service will involve monitoring the quality of materials and workmanship, ensuring contractor&rsquo;s adherence to and implementation of Environmental, Social, Health and Safety (ESHS) requirements, as per the Bank-cleared Checklist Environmental and Social Management Plan (ESMP) coordinating with contractor/s, beneficiary (Cairo Transportation Authority) and the client addressing any issues that arise on-site. Regular progress reports and updates will be provided to the Client, ensuring that the project remains on track and meets all regulatory, environmental, social, and health &amp; safety requirements. Specific requirements for Environmental, Social, Health and Safety (ESHS) supervision:</p>\n\n<ul>\n\t<li>ESHS Supervision and Monitoring: The Consultant will supervise all site activities with a focus on ensuring compliance with ESHS regulations. This includes monitoring the implementation of environmental mitigation measures, safety measures, conducting regular site safety inspections, and ensuring that workers are using appropriate PPE and following safety protocols.</li>\n\t<li>Training and Induction for Workers: The Consultant will ensure that all site workers and contractors undergo an OHS induction program before starting the rehabilitation works. Regular toolbox talks (TBT) will be organized to address specific safety concerns, including hazard identification and risk management.</li>\n\t<li>Monitoring Contractors&rsquo; Environmental, Social, Health &amp; Safety Management Plans: The Consultant will review and approve contractors&#39; ESHS management plans, ensuring they include procedures for managing risks such as asbestos handling, hazardous material management, fire safety, and emergency response.</li>\n\t<li>ESHS Reporting and Documentation: The Consultant will be responsible for generating regular ESHS reports, documenting safety incidents, near misses, and (non-)compliance with OHS regulations.&nbsp; Provide guidance to the Contractor to correct any non-compliance, while thoroughly documenting and immediately reporting to the client with corrective actions recommended.</li>\n</ul>\n\n<p><strong><u>Task 3:</u></strong> The Consultant will provide technical support for the procurement of works contracts, to support the Project in completing the procurement of works tenders efficiently in compliance with the World Bank procurement regulations. The support will include reviewing submitted bids for technical compliance with the issued tender documents and specifications, preparing a technical evaluation report with findings and recommendations, responding to technical queries raised during the evaluation process, and advising the Client on any clarifications or negotiations required with bidders.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;IV.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Technical requirements</strong></p>\n\n<p><strong><u>For Contract 1: (under Lump-Sum Contract)</u></strong></p>\n\n<p>Regarding the Administrative Building detailed design, the following tasks will be included:</p>\n\n<ol>\n\t<li>Architectural and Structural Rehabilitation</li>\n</ol>\n\n<ul>\n\t<li>Conduct a comprehensive assessment of the administrative buildings&#39; condition covering different necessary aspects, including compatibility with national accessibility codes and the good practices for gender sensitive design, and recommend measures for compliance.</li>\n\t<li>Refurbish interior and exterior spaces to improve functionality and aesthetics.</li>\n\t<li>Address structural repairs and reconfigure spaces for better operational efficiency.</li>\n\t<li>Ensure the rehabilitation is done using gender sensitive design (e.g., dedicated women facilities, lighting system, etc.) and universal accessible features.</li>\n</ul>\n\n<p>b. Mechanical, Electrical, and Plumbing (MEP) Systems</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Install new heating, ventilation, and air conditioning (HVAC) systems.</li>\n\t\t<li>Install new electrical systems for safety and efficiency and replace the existing systems (for the administrative buildings only).</li>\n\t\t<li>Replace plumbing and wastewater systems.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>c. Accessibility and Safety Improvements</p>\n\n<ul>\n\t<li>Ensure compliance with accessibility standards.</li>\n\t<li>Install new fire safety systems, including alarms and emergency routes.</li>\n\t<li>Implement modern security measures for enhanced safety (e.g. security cameras &amp; alarm systems).</li>\n</ul>\n\n<p>d.&nbsp; Energy and Water Efficiency and Sustainability</p>\n\n<ul>\n\t<li>Integrate energy-saving and water-saving upgrades and sustainable materials.</li>\n\t<li>Explore renewable energy options such as solar panels.</li>\n</ul>\n\n<p>e. &nbsp; Landscaping and Site Improvements</p>\n\n<ul>\n\t<li>Rehabilitate access roads, pathways, and parking areas (within the administrative buildings premises).</li>\n\t<li>Redesign landscaping and drainage systems to enhance the site&rsquo;s esthetics and functionality.</li>\n</ul>\n\n<p>f.&nbsp;Documentation and Compliance</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Prepare detailed design documents and obtain necessary permits.</li>\n\t\t<li>Ensure compliance with local buildings codes and safety regulations.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>g. Project Management</p>\n\n<ul>\n\t<li>Provide project implementation timeline with critical path, key milestones, and coordination needs for other activities of the project and beneficiaries and stakeholders involved.</li>\n</ul>\n\n<p>h. Health and Safety in Design</p>\n\n<ul>\n\t<li>Integrate health and safety considerations, particularly for areas such as high-risk activities (e.g., electrical work, confined spaces, structural rehabilitation) and the need for ergonomically designed workspaces.</li>\n</ul>\n\n<p>i.&nbsp;Environmental Health Considerations</p>\n\n<ul>\n\t<li>Ensure that the design and site operations address potential environmental health risks, including air quality, noise control, and dust suppression, to minimize exposure for both workers and the surrounding community.</li>\n</ul>\n\n<p>j. Telecom and Light Current (LC) Systems Design</p>\n\n<ul>\n\t<li>The Consultant shall prepare full designs for the following low-current and telecommunications systems within the administrative buildings, ensuring compatibility and integration with the corresponding depot LC systems (refer to Annex A - Light Current Specs-V4-12-3-2026.pdf):</li>\n</ul>\n\n<ul>\n\t<li>Structured Cabling System: Design shall encompass horizontal and backbone cabling routes, telecommunications room layout(s), patch panel schedules, cable tray sizing, outlet locations, and full compliance with TIA/EIA-568 standards. The design shall accommodate telephone, internet, and data service requirements as specified in Annex A - Light Current Specs-V4-12-3-2026.pdf.</li>\n\t<li>CCTV Surveillance System: Design shall include camera placement with full-coverage analysis of all key areas, camera specifications (resolution, lens type, and mounting configuration), NVR/VMS sizing, network bandwidth and storage capacity calculations, and compliance with applicable Egyptian security standards and ONVIF protocol requirements.</li>\n\t<li>Fire Detection and Alarm System: An addressable detection system shall be designed, covering detector layout and type selection, zone planning, manual call point locations, notification appliance placement with supporting sound level calculations, circuit design, integration with fire suppression systems, and compliance with Egyptian Fire Code 801 and BS/EN 54 standards.</li>\n\t<li>Security and Access Control System: Design shall address overall system architecture, access point identification, reader and controller specifications, door hardware coordination, alarm sensor placement, CCTV integration, and provisions for central monitoring.</li>\n\t<li>Data Communications Network: Design shall include network architecture, active equipment specifications (switches, routers, and wireless access points), server room and telecommunications room infrastructure requirements, IP addressing scheme, and internet connectivity provisions.</li>\n</ul>\n\n<p>k. Design Coordination with Depot LC Infrastructure</p>\n\n<ul>\n\t<li>The Consultant shall ensure full coordination and compatibility between the administrative buildings&#39; telecom and light current system designs and the depot&#39;s LC systems developed under the separate consultancy assignment. Coordination shall address, but not be limited to, the following interface areas:</li>\n</ul>\n\n<ul>\n\t<li>Shared fire alarm control panel architecture and unified zone planning across both the depot and administrative buildings;</li>\n\t<li>Common structured cabling backbone standards, telecommunications room specifications, and a consistent cable management approach;</li>\n\t<li>A unified CCTV video management platform capable of managing cameras across both facilities;</li>\n\t<li>An integrated data communications network with coordinated IP addressing, switching, and routing;</li>\n\t<li>Coordinated underground duct routing to eliminate conflicts and ensure accessibility for future maintenance.</li>\n</ul>\n\n<p><strong><u>For Contract 2: (Under Time-Based Contract), </u></strong></p>\n\n<p>&nbsp;</p>\n\n<p>Contract 2 technical requirements are defined through the three sub-tasks described in Section III above. Detailed technical specifications for the depot retrofitting are provided in Annex A.</p>\n\n<p>The Consultant shall provide comprehensive review and site supervision services for the rehabilitation of the administrative buildings and the retrofitting of the bus depot. This includes ensuring compliance with approved designs, specifications, and contractual requirements; monitoring construction progress, quality, safety, and adherence to the timeline; and identifying and analyzing risks that may impact project delivery, quality, or budget. The Consultant shall provide regular progress reports and updates to the client, including risk assessments and recommendations to mitigate delays or technical issues, and advise on corrective measures to achieve project objectives. Additionally, the Consultant will facilitate coordination between contractors, the Client, and stakeholders and maintain detailed supervision records, promptly reporting any deviations or challenges.</p>\n\n<p>The review shall cover the following disciplines:</p>\n\n<ul>\n\t<li>Structural: Structural calculations, reinforcement details, foundation design, load assumptions, and compliance with Egyptian structural codes and WB requirements</li>\n\t<li>Electrical (Heavy Current): Power distribution, transformer sizing, generator capacity, UPS, lighting, lightning protection, surge protection, and cable sizing per Egyptian Distribution Code</li>\n\t<li>Mechanical: HVAC system sizing and zoning, plumbing network, and firefighting system compliance with NFPA and Egyptian Fire Code 801</li>\n\t<li>Architectural: Space planning, accessibility, finishing specifications, universal and gender-sensitive design, and structural/MEP coordination</li>\n\t<li>Civil/Infrastructure: Site works, underground utilities, access roads, drainage, temporary works, and construction phasing for operational continuity</li>\n\t<li>Telecom/LC: Structured cabling (TIA/EIA-568), CCTV coverage, fire detection and alarm (BS/EN 54), data communications, and system integration requirements</li>\n\t<li>EHS: ESMP adequacy, OHS provisions, environmental mitigation measures, and WB ESF compliance (ESS1&ndash;ESS4)</li>\n\t<li>Social: Stakeholder engagement provisions, accessibility, community impact mitigation, and SEP/ESS10 alignment</li>\n</ul>\n\n<p>The Consultant will provide technical support for the procurement of works contracts.</p>\n\n<p>The Consultant shall provide technical support to the Client during the evaluation of bids received for the works tenders, in compliance with the World Bank&rsquo;s procurement regulations. This shall include reviewing submitted bids for technical compliance with the issued tender documents and specifications, preparing a technical evaluation report with findings and recommendations, responding to technical queries raised during the evaluation process, and advising the Client on any clarifications or negotiations required with bidders. The Consultant shall also review and assess any alternative technical proposals or value engineering suggestions submitted by bidders.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;V.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Expected Deliverables</strong></p>\n\n<p><strong><u>Contract 1:</u></strong></p>\n\n<ol>\n\t<li>The Consultant shall prepare and provide a complete bidding package for the administrative buildings retrofitting works, including the technical specifications and tender documents as well as cost estimates.</li>\n\t<li>Specific Environmental and Social clauses that can be used in the tender documents will be incorporated, with particular attention to Occupational Health and Safety (OHS), Labor Management, accessibility and women safety, in compliance with the World Bank Environmental and Social Framework (ESF) and the Bank-cleared checklist Environmental and Social Management Plan.</li>\n\t<li>Health and safety risk assessment for the administrative buildings rehabilitation work.</li>\n\t<li>The Consultant shall submit a comprehensive Design Review Report covering all engineering disciplines of the depot retrofitting design prepared under the separate consultancy.</li>\n</ol>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong><u>Contract 1 Deliverables:</u></strong></p>\n\n<ol>\n\t<li>Inception Report to propose the consultant&rsquo;s work plan with timelines, requirements for both the consultant and owners to proceed with the task and complete successfully, protocols for communication, deliverable submission and approval, and invoicing and payment process, as agreed with the client.</li>\n\t<li>Comprehensive assessment report of the administrative buildings&rsquo; existing conditions, outlining structural, architectural, and MEP issues.</li>\n\t<li>Preliminary design drawings for all the works mentioned in the scope of work</li>\n\t<li>Health and safety risk assessment, emergency response and safety plan for the rehabilitation works.</li>\n\t<li>Tender Documents: Detailed design documents &ldquo;including layout plans, cross sections, profiles&rdquo;, Technical Specifications, Bill of Quantities (BOQ) and bidding documents required for the tender process of the administrative buildingss.</li>\n\t<li>The Consultant shall prepare a Coordination Report in the tender documents, documenting all interface points, integration requirements, shared equipment specifications, protocol compatibility confirmations between the administrative buildings and depot systems, and a project management and action plan with timelines identifying critical path, key milestones, and needed coordination with other activities of the project and of beneficiaries and stakeholders.</li>\n</ol>\n\n<p><strong><u>Contract 2:</u></strong></p>\n\n<p>The Consultant shall provide continuous site supervision of all rehabilitation work in the depot (the depot and its accompanying administrative buildings), ensuring adherence to specified work standards and monitoring of work progress (quality control). These supervision services will include, but are not limited to, the following:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Design Review Report and Corrective Action Register: A comprehensive report documenting all findings from the depot retrofitting design review, covering all engineering disciplines. All findings shall be categorized as Critical, Major, or Minor, with recommended corrective actions and responsible parties identified. The report shall be submitted within three (3) weeks of assignment commencement. The Corrective Action Register shall be updated weekly until all findings are resolved. All critical findings must be cleared prior to construction commencement. The Contract 2 Consultant shall be responsible for verifying the implementation of all corrective actions during the supervision phase and shall maintain the Register as a live document throughout construction. Updated specifications or addenda arising from the design review shall be prepared and issued to the contractor as needed.</li>\n\t<li>Supplying contractor/s with essential data, benchmarks, coordinates, and other relevant information required for setting out the works, followed by checking and approving the detailed setting out.</li>\n\t<li>Reviewing the detailed rehabilitation phase schedule, identifying all critical milestones and actions that should be taken to ensure timely progress.</li>\n\t<li>Establishing a communication protocol for all project stakeholders to ensure efficient and clear communication.</li>\n\t<li>Developing and managing a robust document control system to organize all project documents, such as drawings, reports, instructions, and approvals.</li>\n\t<li>Issuing all necessary instructions to contractors and continuously supervising the work to ensure compliance with contract documents. This includes setting clear forms for construction exchanges between the contractor and the consultant to ensure smooth performance during the construction phase and timely approvals.</li>\n\t<li>Checking and approving contractors&#39; work plans to ensure efficient and timely execution. This includes supervising the work during execution and inspecting all work areas and installations regularly.</li>\n\t<li>Witnessing all tests related to the completion of systems, subsystems, and the entire project, and certifying the successful completion of these tests.</li>\n\t<li>Identifying non-compliance by the rehabilitation contractor and defining corrective actions to be implemented.</li>\n\t<li>Reviewing and approving all working drawings prepared by contractors to ensure they conform to project specifications.</li>\n\t<li>Verifying contractors&rsquo; work measurements and certifying payment claims, after providing warranty letter against executed work.</li>\n\t<li>Assisting the client in negotiations with contractors for any contractually permissible changes in price or rates and making recommendations based on technical and financial assessments.</li>\n\t<li>Notifying the client of any problems that arise, or that may arise, in connection with civil works contracts, and providing recommendations for solutions to the contractor and client.</li>\n\t<li>Evaluating contractors&#39; claims for additional payments or time extensions and making informed recommendations to the client based on contract terms and project status.</li>\n\t<li>Supporting the client in contract management and resolving disputes and formal communications on corrective actions and penalties with contractor during the contract period, providing all necessary information for judgments and decisions.</li>\n\t<li>Organizing monthly site meetings and submitting minutes of these meetings within one week of each meeting. Moreover, the consultant has to submit a monthly progress report for the client including all the work updates and its compliance with the planned schedule.</li>\n\t<li>Document works activities and prepare progress Reports including the updates on project status, including supervision reports, ESHS compliance reports (OHS compliance certificate, training records, near misses, incidents, accident reports), quality control checklists, and recommendations for approving the contractor&#39;s payment invoices.</li>\n\t<li>Supporting the client in the issuance of the compliance certificate upon successful completion of the rehabilitation phase to the contractor. Conducting final tests and issuing the Practical Completion Certificate to the contractor upon successful project completion.</li>\n\t<li>Preparing and reporting the environmental and social management records (e.g. solid and liquid waste management records, hazardous materials records, hazardous waste management records, labor working conditions, grievance mechanism, etc.) to the client. The Social and Gender Expert shall additionally manage the Grievance Redress Mechanism, conduct regular community consultations, monitor labor welfare in compliance with ESS2, ensure ESS10 compliance, and oversee gender-sensitive and accessibility provisions throughout the construction works.</li>\n\t<li>Site Safety Management Plan: The Consultant will manage and supervise the Site Safety Management Plan that outlines the procedures for ensuring worker safety on-site, including hazard identification, risk assessment, emergency procedures, and PPE requirements provided by the contractor.</li>\n\t<li>Safety Inspections and Progress Reports: The Consultant will provide monthly safety inspection reports, including the status of safety measures and any corrective actions taken by the contractor. These reports will ensure that the rehabilitation works are proceeding in line with OHS standards.</li>\n\t<li>Prepare testing and commissioning report for each subsystem upon completion of installation, a report documenting subsystem test results, integrated system acceptance outcomes, punch list items, and confirmation of O&amp;M manual and training delivery. A final consolidated Systems Report shall be submitted prior to the Practical Completion Certificate.</li>\n\t<li>Support the client in issuance of compliance and practical completion certificates once all works are finalized.</li>\n\t<li>Telecom and Light Current (LC) Systems Supervision.\n\t<ol>\n\t\t<li>The Telecom/LC supervision function shall ensure that all low-current and telecommunications systems within the Ameriyah Depot are installed, integrated, tested, and commissioned in full compliance with the approved designs, Telecom/LC specifications, and applicable standards. The following six subsystems, as defined in Annex A - Light Current Specs-V4-12-3-2026.pdf, fall within this scope: (1) Parking Control Equipment (Section 11 12 00); (2) Structured Cabling System (Section 27 10 00); (3) Data Communications Network (Section 27 20 00); (4) IP-Based Video Surveillance System (Section 28 23 00); (5) Fire Detection and Alarm System (Section 28 31 00); and (6) Underground Ducts and Raceways for Telecommunications (Section 26 05 43). This scope requires dedicated specialist supervision and cannot be absorbed into the general Electrical (Heavy Current) discipline.</li>\n\t\t<li>The Telecom/LC experts shall: (a) review and approve all contractor shop drawings, product data, and method statements for each LC subsystem prior to installation; (b) verify that RCDD certification is applied to all structured cabling design and shop drawing documents; (c) supervise installation works to ensure compliance with approved drawings, Telecom/LC specifications, and applicable standards (TIA/EIA-568, BS/EN 54, ONVIF, Egyptian Fire Code 801); (d) witness and certify all testing and commissioning activities, including cable certification, zone-by-zone CCTV and fire alarm testing, data network commissioning (including EV SCMS server integration), and integrated system acceptance testing; (e) coordinate with the Electrical Engineer (Heavy Current) on shared power supply, cable tray allocation, grounding, and UPS requirements; (f) verify proper integration between all LC subsystems across the shared IP backbone; and (g) review and approve contractor O&amp;M manuals, as-built drawings, and training delivery for all LC subsystems prior to practical completion. The subsystem responsibilities of the Telecom/LC Senior Expert and the Telecom/LC Expert shall be clearly mapped in the proposal staffing plan to demonstrate that all six subsystems are covered.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p><strong><u>Contract 2 Deliverables:</u></strong></p>\n\n<ol>\n\t<li>Design Review Report and Corrective Action Register: A comprehensive report documenting all findings from the depot retrofitting design review, covering all engineering disciplines. All findings shall be categorized as Critical, Major, or Minor, with recommended corrective actions and responsible parties identified. The report shall be submitted within three (3) weeks of assignment commencement. The Corrective Action Register shall be updated weekly until all findings are resolved. All critical findings must be cleared prior to construction commencement. The Contract 2 Consultant shall be responsible for verifying the implementation of all corrective actions during the supervision phase and shall maintain the Register as a live document throughout construction. Updated specifications or addenda arising from the design review shall be prepared and issued to the contractor as needed.</li>\n\t<li>Progress Reports: Regular updates on project status, including supervision reports, ESHS compliance reports (OHS compliance certificate, training records, near misses, incidents, accident reports), quality control checklists, and recommendations for approving the contractor&#39;s payment invoices.</li>\n\t<li>Testing and Commissioning Report: For each all subsystem upon completion of installation, a report documenting subsystem test results, integrated system acceptance outcomes, punch list items, and confirmation of O&amp;M manual and training delivery. A final consolidated systems report shall be submitted prior to the practical completion certificate.</li>\n\t<li>Completion Certificates: Support the client in issuance of compliance and practical completion certificates once all work is finalized.</li>\n\t<li>Bid Evaluation Report: A technical evaluation report covering all received bids for the administrative buildings rehabilitation works, assessing compliance with tender documents and specifications, highlighting any technical deficiencies or alternative proposals, and providing clear recommendations to the Client for contractor selection. The report shall be submitted within <strong>10 working days</strong> of the bid submission deadline.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>VI.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Qualifications Required</strong></p>\n\n<p>The Consultant (consultancy firm) must have previous experience in at least five (5) similar projects that involved the preparation of detailed technical and engineering designs. Similar projects should involve the rehabilitation of multi-story buildings and/or transport infrastructure such as bus depots, parking facilities, or similar structures. Experience with transport-related facilities and their administrative buildings is preferred but not mandatory. These projects should demonstrate the Consultant&#39;s capability in delivering high-quality engineering designs for the rehabilitation or construction of administrative or comparable facilities.</p>\n\n<p>Qualifications are specified per contract. Firms expressing interest in both contracts shall demonstrate compliance with each contract&#39;s requirements separately.</p>\n\n<p>The consulting team should consist of highly qualified professionals with specific roles and responsibilities. Each team member must possess the following qualifications:</p>\n\n<p>&nbsp;</p>\n\n<p><u>Contract 1 &mdash; Key Expert Qualifications:</u></p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:690px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:97px\">\n\t\t\t<p><strong>Position</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:130px\">\n\t\t\t<p><strong>Qualifications</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:142px\">\n\t\t\t<p><strong>Experience</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:321px\">\n\t\t\t<p><strong>Expertise</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Project Manager/Team Leader</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Civil Engineering, Architecture, or Construction Management.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 10 years of experience in managing construction/renovation projects.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience managing at least 3 renovation projects of administrative buildings, including preparation of tender documents and bidding packages. Familiarity with World Bank procurement regulations or equivalent international development bank procedures for the preparation of works contracts is an advantage.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Architecture, registered with a recognized architectural body.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of experience in architectural design for office or public buildings.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in at least 3 similar projects. Ability to design functional and sustainable spaces.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Structural Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Structural Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of experience in structural design for buildings renovation.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in assessing structural integrity and providing reinforcement solutions. Involved in at least 3 similar projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Mechanical Engineer (HVAC &amp; Plumbing)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Mechanical Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of experience in HVAC and plumbing system design.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in designing efficient mechanical systems for at least 3 projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Electrical Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Electrical Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of experience in electrical system design for buildings.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in designing electrical systems for at least 3 renovation projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Quantity Surveyor</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Quantity Surveying or Construction Economics.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of experience in cost estimation and financial management.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Proven ability to prepare BOQs and cost estimates for at least 2 similar projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Environmental, Health and Safety&nbsp; specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Environmental engineering or environmental management, acknowledged professional certification in OHS management (a must)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of relevant experience</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in conducting environmental and OHS supervision of construction/rehabilitation projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Social and Gender Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>A professional with Post Graduate Degree in social development or a related field</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum of 7 years of relevant experience</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Expertise in the fields of disability and accessibility, women safety as well as labor welfare to ensure inclusive design and to ensure that the suggested rehabilitation and upgrade works are full aligning with national codes/ requirement and good international practices. The consultation process should be indicated in the consultant phasing plan. The outcome of the consultations should be integrated withing the design.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:97px\">\n\t\t\t<p>Telecom/LC Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:130px\">\n\t\t\t<p>Degree in Telecommunications, Electronics, or Communications Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:142px\">\n\t\t\t<p>Minimum 7 years of experience in design of low-current/telecom systems for commercial or institutional buildingss.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:321px\">\n\t\t\t<p>Experience in at least 2 projects involving integrated LC design (structured cabling + CCTV + fire alarm minimum). Familiarity with TIA/EIA-568, BS/EN 54, ONVIF standards. Demonstrated ability to coordinate LC design with separately-designed buildings systems.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><u>Contract 2 &mdash; Key Expert Qualifications:</u></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:16%\">\n\t\t\t<p><strong>Position</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:23%\">\n\t\t\t<p><strong>Qualifications</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:36%\">\n\t\t\t<p><strong>Experience</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:22%\">\n\t\t\t<p><strong>Expertise</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Project Manager / Team Leader (Supervision)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Civil Engineering, Architecture, or Construction Management.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 10 years in managing construction/renovation supervision projects.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 3 supervision projects for administrative buildingss or transport infrastructure. Strong leadership and coordination.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Civil / Infrastructure Engineer</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Civil Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years in supervision of civil/structural rehabilitation works.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 3 similar supervision projects. Ability to verify designs and supervise construction quality.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Electrical Engineer (Heavy Current)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Electrical Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years in supervision of electrical systems installation.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 3 renovation/construction supervision projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Mechanical Engineer (HVAC/Plumbing)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Mechanical Engineering.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years in supervision of HVAC and plumbing installation.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 3 similar projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Architect (Supervision)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Architecture.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years in supervision of architectural and finishing works.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 3 similar projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Quantity Surveyor</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Quantity Surveying or Construction Economics.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years in measurement, payment certification, cost management.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>At least 2 similar projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>EHS Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Environmental Engineering or Management. Professional OHS certification (required).</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years relevant experience.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>Environmental and OHS supervision of construction/rehabilitation. WB ESF experience.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Social and Gender Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Post Graduate Degree in social development or related field.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 7 years relevant experience.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>Disability/accessibility, women safety, labor welfare, GRM management, ESS2/ESS10 experience.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Telecom/LC Senior Expert (Supervision)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Telecom/Electronics/Communications Eng. RCDD, CCNA or equivalent required.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 10 years in design/supervision of LC/telecom systems for commercial or institutional buildingss.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>Experience in at least 3 projects involving integrated low-current systems. The Senior Expert shall demonstrate proven expertise in a minimum of three of the following subsystems: IP-based video surveillance (ONVIF), structured cabling (TIA/EIA-568), fire detection and alarm (BS/EN 54), data communications networking, parking control systems, and security/access control. Demonstrated experience in system integration across multiple LC subsystems and in managing testing and commissioning programs. The combined expertise of the Senior Expert and the LC Expert shall collectively cover all six LC subsystems within the project scope. The Consultant shall demonstrate in the proposal how the two experts&#39; qualifications complement each other to ensure full coverage.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:16%\">\n\t\t\t<p>Telecom/LC Expert (Supervision)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:23%\">\n\t\t\t<p>Degree in Telecom/Electronics/Electrical/Communications Eng.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:36%\">\n\t\t\t<p>Minimum 5 years in LC installation supervision or testing and commissioning.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:22%\">\n\t\t\t<p>Experience in at least 2 projects involving low-current system installation supervision or testing and commissioning. The LC Expert shall demonstrate proven expertise in a minimum of two of the following subsystems: IP-based video surveillance, structured cabling, fire detection and alarm, data communications networking, parking control systems, and security/access control. Hands-on experience with cable certification equipment and system commissioning procedures is required. The LC Expert&#39;s specializations shall complement those of the Senior Expert such that, together, the two experts provide demonstrated coverage of all six LC subsystems. The Consultant shall clearly map each expert&#39;s subsystem responsibilities in the proposal staffing plan.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The Project Manager, Civil/Infrastructure Engineer, Environmental, Health and Safety Specialist and the Social and Gender Expert shall be present onsite on a full-time (every working day) basis throughout the entire construction period. Proposals must demonstrate how continuous onsite coverage will be maintained, including explicit provisions for leave replacement arrangements.</p>\n\n<p>The consultancy firm must provide references and case studies from previous clients that demonstrate the firm&rsquo;s competency in completing projects of similar scale, complexity, and purpose. The required full-site supervision entails the continuous presence of the entire mentioned supervision team onsite throughout the entire construction duration. The team shall be responsible for ensuring compliance with designs, specifications, and contractual requirements, monitoring progress, quality, and safety, identifying risks, and providing timely recommendations to mitigate delays or technical issues. Their full-time onsite presence is essential to facilitate effective coordination between contractors, the Client, and relevant stakeholders, ensuring the smooth implementation of the project.</p>\n\n<p>The firm should also submit detailed resumes/CVs of the proposed team members, highlighting their specific roles in previous projects and their qualifications relevant to this project. The evaluation and selection of proposals will be based on compliance with the above qualifications, the relevance and quality of past project experience, the overall technical strength and approach presented in the proposal, and the best financial offer.</p>\n\n<p>The primary working language for this assignment will be English. All reports, deliverables, and official communications must be submitted in English, unless otherwise agreed. However, interaction with stakeholders may require the use of Arabic. In such cases, the Consultant shall ensure appropriate translation or interpretation services are provided to facilitate effective communication.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>VII.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Deliverables and Timeline</strong></p>\n\n<p>The following table provides an indicative deliverable timeline; however, the consultant may propose alternatives with justification. The Client may review and negotiate proposals to ensure feasibility and cost-effectiveness.</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:41px; width:39%\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:41px; width:37%\">\n\t\t\t<p><strong>Timeline</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:41px; width:23%\">\n\t\t\t<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t\t\t\t<tbody>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td style=\"height:38px; vertical-align:top\">\n\t\t\t\t\t\t<p><strong>Estimated level of effort (Man-Days)</strong></p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td style=\"height:2px; vertical-align:top\">&nbsp;</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</tbody>\n\t\t\t</table>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:100%\">\n\t\t\t<p><strong>Total Contract 1 </strong><strong>Duration: 55 working days</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:39%\">\n\t\t\t<p>D 1: Phasing plan and Inception report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:37%\">\n\t\t\t<p>10 Working days after contract signing</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:23%\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>10&ndash;12 man-days</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:39%\">\n\t\t\t<p>D 2: Preliminary design drawings for all the works mentioned in the scope of work</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:37%\">\n\t\t\t<p>15 Working days after approving the phasing plan and Inception report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:45px; vertical-align:top; width:23%\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>35&ndash;45 man-days</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:39%\">\n\t\t\t<p>D 3: Health and safety risk assessment</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:37%\">\n\t\t\t<p>10 Working days after approval of preliminary design drawings</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:23%\">\n\t\t\t<p>8&ndash;10 man-days</p>\n\n\t\t\t<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t\t\t\t<tbody>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td style=\"height:2px; vertical-align:top\">&nbsp;</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</tbody>\n\t\t\t</table>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:39%\">\n\t\t\t<p>D4: Tender Documents:</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:37%\">\n\t\t\t<p>20 Working days approving submission of Health and safety risk assessment</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1px; vertical-align:top; width:23%\">\n\t\t\t<p>20&ndash;25 man-days</p>\n\n\t\t\t<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t\t\t\t<tbody>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td style=\"height:2px; vertical-align:top\">&nbsp;</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</tbody>\n\t\t\t</table>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Contract 2:</strong></p>\n\n<p><strong>B. Design Review Performance (Contract 2 &ndash; Task 1) Duration: three (3) Weeks</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:52%\">\n\t\t\t<p><strong>KPI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:47%\">\n\t\t\t<p><strong>Target</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:52%\">\n\t\t\t<p>Design Review Report submitted within agreed timeline</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47%\">\n\t\t\t<p>Within three (3) weeks of assignment commencement</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:52%\">\n\t\t\t<p>Critical design findings communicated to client</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47%\">\n\t\t\t<p>Within 48 hours of identification</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:52%\">\n\t\t\t<p>Corrective Action Register established</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47%\">\n\t\t\t<p>Within 1 week of Design Review Report approval</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:52%\">\n\t\t\t<p>All critical findings resolved prior to construction start</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:47%\">\n\t\t\t<p>100% clearance required</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:26px; vertical-align:top; width:52%\">\n\t\t\t<p>Major findings resolved within</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:26px; vertical-align:top; width:47%\">\n\t\t\t<p>4 weeks of identification</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>C. Site Supervision (Contract 2 &ndash; Task 2) Duration: 14 Months (estimated), to be in full alignment with the works at the Ameriyah Depot.</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\">\n\t\t\t<p><strong>KPI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\">\n\t\t\t<p><strong>Target</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Monthly progress reports submitted by Day 5 of each month</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>100% on-time submission</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Site inspection frequency by resident engineers</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Minimum daily during active works</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>EHS specialist onsite presence</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Minimum 22 working days/month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Social and Gender Expert onsite presence</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Minimum 22 working days/month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Corrective Action Register updated</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Weekly minimum</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Non-conformance notices issued to contractor within</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>24 hours of identification</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Critical non-conformances escalated to client within</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Same working day</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>D. EHS Performance (Contract 2)</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:643px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:17px; vertical-align:top\">\n\t\t\t<p><strong>KPI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:17px; vertical-align:top\">\n\t\t\t<p><strong>Target</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>Toolbox talks conducted</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>Minimum 2 per week</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>Monthly EHS inspection reports submitted</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>100% on-time</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>Lost Time Injury (LTI) incidents investigated and reported</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>Within 24 hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>Near-miss incidents documented and reported</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>Within 24 hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>Worker OHS induction completion before site access</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:18px; vertical-align:top\">\n\t\t\t<p>100% of workers</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>PPE compliance rate observed during inspections</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:17px; vertical-align:top\">\n\t\t\t<p>Minimum 95%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>E. Social and Grievance Performance (Contract 2)</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:640px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top\">\n\t\t\t<p><strong>KPI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:20px; vertical-align:top\">\n\t\t\t<p><strong>Target</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>Grievance Redress Mechanism (GRM) log updated</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>Weekly minimum</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Grievances acknowledged to complainant</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Within 5 working days</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>Grievances resolved and closed</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>Within 21 working days</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Community consultation sessions conducted</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Minimum once per quarter</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>ESS2 labor welfare monitoring reports submitted</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; vertical-align:top\">\n\t\t\t<p>Monthly</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Gender and accessibility compliance checks documented</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:20px; vertical-align:top\">\n\t\t\t<p>Monthly</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>F. Reporting and Communication (Contract 2)</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\">\n\t\t\t<p><strong>KPI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\">\n\t\t\t<p><strong>Target</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Monthly progress meetings attended by Team Leader</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>100% attendance</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Meeting minutes submitted to client</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Within 5 working days of each meeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Response to client technical queries</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Within 3 working days</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>As-built drawings reviewed and approved</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Within 10 working days of contractor submission</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>O&amp;M manuals reviewed and approved</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">\n\t\t\t<p>Prior to practical completion</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>G. Bid Evaluation (Contract 2 &ndash; Task 3) Duration 10 working days</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top\">\n\t\t\t<p>Bid Evaluation Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top\">\n\t\t\t<p>Within 10 working days from bid submission deadline</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:40px; vertical-align:top\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>8&ndash;10 man-days</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Total Contract 2 duration: 15 months 1 week</strong></p>\n\n<p><strong>Monitoring and Consequences:</strong></p>\n\n<p>The Client will assess KPI compliance of the consultant on a monthly basis. The following escalation approach will apply:</p>\n\n<ul>\n\t<li><strong>First instance</strong> of KPI non-compliance: Written notice issued to Consultant</li>\n\t<li><strong>Second consecutive instance</strong>: Formal warning with required corrective action plan within 5 working days</li>\n\t<li><strong>Persistent non-compliance</strong> (3 or more consecutive months): The Client reserves the right to invoke contractual remedies as stipulated in the contract agreement, which may include payment adjustments or termination provisions</li>\n</ul>\n\n<p>The Consultant shall include a <strong>KPI Compliance Summary</strong> as a standing section in each monthly progress report, self-reporting against all applicable indicators and providing explanations for any targets not met.</p>\n\n<p><strong>Reporting Lines: </strong></p>\n\n<p>The consultants will report to the GCCC Component 3, TIU head and the CTA project manager.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00440845","notice_type":"Request for Expression of Interest","noticedate":"24-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-05-15T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P179804","project_name":"Africa Think Tank Platform Project","bid_reference_no":"ET-AUC-494958-CS-QCBS","bid_description":"Selection of a Consulting Firm to conduct a Feasibility study for the Endowment Fund and Designing a Resource Mobilization Strategy for the Africa Think Tank Platform Endowment Fund","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"ChirwaT@AfricanUnion.org","contact_name":"Themba Gilbert Chirwa","contact_organization":"Africa Union Commission","contact_phone_no":"+251982878023","submission_date":"2026-04-24T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:652px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:none; border-left:none; border-right:none; border-top:none; height:33px; width:236px\">\n\t\t\t<p><em>AFRICAN UNION</em></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"3\" style=\"background-color:#d0ddef; border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; height:33px; width:218px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:none; border-left:none; border-right:none; border-top:none; height:33px; width:198px\">\n\t\t\t<p><em>UNION AFRICAINE</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:none; border-left:none; border-right:none; border-top:none; height:36px; width:236px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:none; border-left:none; border-right:none; border-top:none; height:36px; width:198px\">\n\t\t\t<p><em>UNI&Atilde;O AFRICANA</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; height:27px; width:236px\">\n\t\t\t<p><strong>UMOJA WA AFRIKA</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0ddef; border-bottom:1px solid black; border-left:none; border-right:none; border-top:none; height:27px; width:198px\">\n\t\t\t<p><strong>UNI&Oacute;N AFRICANA</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Name of the Project: THE AFRICA THINK-TANK-PLATFORM (ATTP) PROJECT</strong></p>\n\n<p><strong>Grant No: P180117</strong></p>\n\n<p><strong>Assignment Title: </strong>Selection of a Consulting Firm to conduct a Feasibility study for the Endowment Fund and Designing a Resource Mobilization Strategy for the Africa Think Tank Platform Endowment Fund</p>\n\n<p><strong>Procurement Ref:</strong> ET-AUC- 494958-CS-QCBS</p>\n\n<p>&nbsp;</p>\n\n<p>The Africa Union Commission has<em> </em>received financing from the World Bank toward the cost of the Africa Think-Tank-Platform (ATTP) Project and intends to apply part of the proceeds for consulting services.</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include Consultancy service to conduct a Feasibility study for the Endowment Fund and Designing a Resource Mobilization Strategy for the Africa Think Tank Platform Endowment Fund</p>\n\n<p>The Terms of Reference (TOR) for the assignment is attached to this request for expressions of interest.</p>\n\n<p>The African Union Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to submit their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>THE SHORTLISTING CRITERIA ARE:</p>\n\n<ol>\n\t<li>Firm&rsquo;s core business</li>\n\t<li>Firm&rsquo;s years of general business experience</li>\n\t<li>Relevant similar experience of the firm in the assignment</li>\n\t<li>Technical and managerial capability of the firm</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Key Experts will not be evaluated at the shortlisting stage.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 updated in November 2020. Procurement will also comply with &ldquo;Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants&rdquo; revised as of July 1, 2016.</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>&nbsp;</p>\n\n<p>The selection method is Quality and Cost Based Selection (QCBS) as set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours i.e. 0900 to 1700 hours.</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by 15 May 2026</p>\n\n<p>&nbsp;</p>\n\n<p><strong>African Union Commission,</strong></p>\n\n<p><strong>Attn: Head of Supply Chain Management Division</strong></p>\n\n<p><strong>Building C, 3rd Floor,</strong></p>\n\n<p><strong>P.O Box 3243, Roosevelt Street</strong></p>\n\n<p><strong>Addis Ababa, Ethiopia</strong></p>\n\n<p><strong>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</strong></p>\n\n<p><strong>Fax: +251 (0) 11 551 0442; +251 11-551-0430</strong></p>\n\n<p><strong>E-mails: tender@africanunion.org. &nbsp;&nbsp;</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>THE AFRICA THINK-TANK-PLATFORM (ATTP) PROJECT</strong></p>\n\n<p><strong>Selection of a Consulting Firm to conduct a Feasibility study for the Endowment Fund and Designing a Resource Mobilisation Strategy for the Africa Think Tank Platform Endowment Fund </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Procurement Reference No.ET-AUC-</strong> <strong>494958-CS-QCBS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>1. Introduction</strong></p>\n\n<p><strong>1.1 Background</strong></p>\n\n<p>The Africa Think Tank Platform (ATTP) project is a strategic initiative designed to enhance the capacity and influence of think tanks across Africa. With a five-year, US$50 million Investment Project Financing (IPF) initiative, the ATTP project aims to create a sustainable platform for cooperation and harmonisation on regional policy issues among country-level policymakers, regional blocs, and think tanks across the continent.</p>\n\n<p>The project focuses on six key priority themes: economic transformation and governance, climate change, regional trade, food security, human capital, and digitalisation, which align with the African Union&rsquo;s Agenda 2063, the World Bank&#39;s Africa Strategy, and the United Nations&#39; Sustainable Development Goals (SDGs). Gender inclusivity remains a central aspect of the project&rsquo;s design.</p>\n\n<p>The African Union Commission (AUC), with funding from the World Bank, is establishing the Africa Think Tank Platform (ATTP). The aim of this consultancy assignment is to conduct a Feasibility Study and design a Resource Mobilisation Strategy for the ATTP endowment fund.</p>\n\n<p>Selection will follow Quality-and Cost-Based Selection (QCBS) under the World Bank Procurement Regulations for IPF Borrowers. Firms must comply with the World Bank&rsquo;s Anti-Corruption Guidelines, including prohibitions on fraud, corruption, collusion, coercion, and obstruction. The African Union Commission (AUC) reserves the right to verify references, conduct due diligence, and perform sanctions checks. Firms from all eligible countries, in accordance with the Procurement Regulations, are invited to participate. Firms, individuals, or entities subject to applicable World Bank sanctions are ineligible. Conflicts of interest must be fully disclosed in proposals in accordance with the Procurement Regulations. Undisclosed conflicts of interest may result in disqualification or contract termination.</p>\n\n<p>The AUC, therefore, invites proposals from qualified and legally registered Consulting Firms. Proposals may be submitted by a single entity or by a consortium/joint venture of firms, provided they collectively meet the minimum qualifications stipulated in this TOR.</p>\n\n<p>1.2&nbsp;<strong> </strong><strong>The ATTP Project Development Objective</strong><strong> </strong></p>\n\n<p>The ATTP project&#39;s development objective is to establish a sustainable platform that strengthens the capacity for effective policy research and policymaking on cross-border priorities in Africa.</p>\n\n<p>​​​​​​​1.3&nbsp;<strong> </strong><strong>The ATTP Project Components</strong><strong> </strong></p>\n\n<p>The ATTP project will be implemented through three main components as follows:</p>\n\n<p>​​​​​​​<strong><em> </em></strong><strong><em>Component 1: Establish Capacity to Operate A Sustainable Policy-Making Platform</em></strong></p>\n\n<p>This component focuses on establishing the capacity to operate a sustainable policy-making platform. The goal is to support knowledge generation and offer guidance on continental priority issues, thereby strengthening the platform&#39;s role in regional economic policymaking.</p>\n\n<p>Think Tanks selected under ATTP will collaborate with relevant Specialised Technical Committees (STCs)[1] at the African Union, fostering a network of researchers and policymakers. The resources under this Component will be utilised to finance the following Tasks:</p>\n\n<ul>\n\t<li>Establishing a secretariat to manage the platform</li>\n\t<li>Establishing and maintaining the Think Tank Platform Steering Committee (TTPSC), including its meetings</li>\n\t<li>Designing and implementing monitoring and evaluation (M&amp;E) strategies for the platform</li>\n\t<li>Establishing mechanisms to draw and learn from lessons during implementation</li>\n\t<li>Building and maintaining a network of think tanks, Regional Economic Communities (RECs), and policymakers</li>\n\t<li>Organising meetings of African governments, RECs, and other partners to identify and discuss regional policy challenge​​​​​​​</li>\n</ul>\n\n<p><strong><em>&nbsp;</em></strong><strong><em>Component 2: Strengthen Policy Research&#39;s Quality, Relevance, and Uptake on Priority Issues</em></strong></p>\n\n<p>This component focuses on strengthening the capacity of think tanks and policy research institutions. This includes providing technical assistance and training to think tanks; supporting the quality and dissemination of research; facilitating resource mobilisation; establishing a peer network for female economic researchers; and conducting a study to analyse prior initiatives aimed at increasing female participation in policy research. The resources under this Component will be utilised to finance the following Tasks:</p>\n\n<ul>\n\t<li>Create and maintain a database of African and global think tanks, including information on the number of female professionals.</li>\n\t<li>Organise knowledge exchange events, such as regional conferences and forums, to align policy researchers and policymakers on policy needs and promote uptake and adoption</li>\n\t<li>Facilitate fellowships or secondment programs between governments and think tanks to enhance research skills and narrow the research-policy gap, supporting both government and think tank capacities</li>\n\t<li>Provide training and capacity building for policymakers, civil society, and other stakeholders to develop their research and analytical capabilities</li>\n\t<li>Create and maintain an online Africa Knowledge Repository of existing policy research, including data on research outputs with female authors.</li>\n\t<li>Finance high-quality research on priority issues and support think tanks&#39; capacity building to provide a knowledge and evidence base for regional policy making and engagement.</li>\n</ul>\n\n<p><strong><em>​​​​​​​ </em></strong><strong><em>Component 3: Support Platform Sustainability</em></strong></p>\n\n<p>This Component will support the design and establishment of a sustainable financing mechanism to resource African think tanks over the long term. The platform will be structured to mobilise, pool, and deploy resources from African governments, the private sector, foundations, individuals, diaspora philanthropy, and institutional donors. It will consider an endowment fund and other complementary instruments (for example, a pooled special fund, multi-year partnership windows, fee-for-service and membership models, blended finance structures, and other context-appropriate mechanisms) to ensure resilient, diversified financing beyond the life of the ATTP project. The resources under this Component will be utilised to finance the following Tasks.</p>\n\n<ul>\n\t<li>Defining the platform&#39;s purpose, scope and governance framework</li>\n\t<li>Develop and implement a resource mobilisation and financing strategy</li>\n\t<li>Capitalisation of the Endowment Fund once established</li>\n</ul>\n\n<p>The primary objective of this Component is to ensure that the ATTP extends beyond the traditional five-year project cycle in international development financing. Consequently, the feasibility study requested under these TORs must not only assess and compare potential financing mechanisms, but it must also recommend a coherent platform design and phased roadmap that sets out how the selected mechanisms will be established, governed, capitalised, and operated, ensuring it remains a legacy asset for the continent&rsquo;s future generations of policymakers.</p>\n\n<p>Throughout these Terms of Reference, the terms &quot;sustainable financing platform,&quot; &quot;endowment fund,&quot; &quot;general fund,&quot; and related variants are used in recognition of ongoing Member State consultations regarding the optimal financing architecture for long-term ATTP sustainability. While the preferred option under consideration is to establish both an endowment fund (to generate investment income) and a general fund (for operational deployment of resources), this feasibility study is designed to maintain flexibility in its scope and recommendations.</p>\n\n<p>The core mandate of this consultancy is to assess the full spectrum of sustainable financing options, including but not limited to endowment structures, pooled funding mechanisms, multi-year partnership windows, and blended finance instruments. The consulting firm is asked to recommend the most appropriate combination of mechanisms for establishing a sustainable financing mechanism for the ATTP. Where the document refers to &quot;the endowment fund and general fund,&quot; this should be understood as the baseline scenario for analysis, while recognising that final recommendations may propose alternative or complementary configurations based on the feasibility assessment, stakeholder consultations, and alignment with AUC financial rules and Member State preferences.</p>\n\n<p>​​​​​​​<strong>&nbsp;1.4&nbsp;</strong><strong>The Project&rsquo;s Logical Framework</strong><strong> </strong></p>\n\n<p>Based on the proposed components and tasks, the ATTP project aims to deliver a series of benefits streams that improve policymaking and implementation across Africa. The ATTP project&#39;s logical framework is centred on establishing a robust Think Tank Platform to support research on continental priority issues by African Think Tanks, particularly policy research by female researchers.&nbsp;</p>\n\n<p>The logical framework depicted in Figure 1 highlights the key components and their expected outcomes in establishing a sustainable platform that strengthens the capacity for effective policy research and policymaking, led by African Think Tanks, on cross-border priorities affecting Africa. The project&rsquo;s interventions are structured across three main components, each with its own assumptions and risks that can influence the achievement of the desired outcomes.</p>\n\n<p>​​​​​​​1.5&nbsp;<strong> </strong><strong>The ATTP Proposed Development Model and Governance Framework</strong><strong> </strong></p>\n\n<p>The ATTP project model is designed to leverage strategic oversight and diverse funding sources to advance its mission. The Think Tank Platform Steering Committee is central to this model and is expected to provide strategic direction and oversight, ensuring that the platform&#39;s activities align with its overarching goals. As illustrated in Figure 2, the ATTP Project will be implemented through a multi-tiered governance framework anchored by the Think Tank Platform Steering Committee, comprising representatives from the African Union, regional economic communities (RECs), development partners, academia, and the private sector.</p>\n\n<p>Day-to-day operations will be managed by the ATTP Secretariat (hosted under the AUC&rsquo;s PMRM Directorate) and led by the Project Coordinator, with support from cross-functional teams, including finance, monitoring and evaluation (M&amp;E), capacity building, and a technical advisor. The Secretariat will enforce Performance Partnership Agreements (PPAs) with think tanks, ensuring accountability through predefined key performance indicators (KPIs) and periodic evaluations.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>​​​​​​​1.6&nbsp;<strong>Objectives of the Assignment </strong></p>\n\n<p>African think tanks currently face significant financial fragility, undermining their capacity to contribute effectively to continental policy processes. This fragility manifests in several interconnected ways:</p>\n\n<ul>\n\t<li><strong>Over-reliance on short-term, donor-driven project funding. </strong>Many African think tanks rely on external donor grants, with typical short project cycles of less than a year. This creates perpetual fundraising pressures, operational uncertainties during funding gaps, and incentives to align research agendas with donor priorities rather than African policy needs.</li>\n\t<li><strong>Limited diversification of revenue sources. </strong>Few African think tanks have developed sustainable revenue models that are not dependent on grants. Revenue-generating activities, such as contracted policy advisory services, training programs, and premium research products, remain underdeveloped. Endowment income, membership dues, or government core funding is also rare.</li>\n\t<li><strong>Inability to retain talent and build institutional capacity. </strong>Short-term funding undermines human capital development. Researchers are hired on project contracts and released when funding ends, fragmenting teams and dispersing expertise. Senior talent migrates to more stable employment in government, multilateral organisations, or international NGOs. Institutional memory erodes with each funding cycle, preventing think tanks from building the deep sectoral expertise and analytical capabilities needed to influence complex policy debates.</li>\n\t<li><strong>Constraints on research quality and strategic engagement. </strong>Financial instability forces think tanks to produce reactive, short-term research rather than sustained, longitudinal studies that track policy implementation and impact over time. Multi-year initiatives essential to understanding economic transformation, climate adaptation, or regional integration become difficult to sustain. Think tanks struggle to maintain consistent engagement with policymakers when their operational continuity is uncertain.</li>\n\t<li><strong>Insufficient access to technology and data, and weak public engagement</strong>. Many think tanks lack robust technology and data infrastructure, limiting their ability to conduct timely, high-quality research and effectively communicate findings to broader audiences, including policymakers and the public.</li>\n\t<li><strong>Governance and regulatory obstacles</strong>. Weak governance structures, restrictive regulatory environments, and limited visibility in policy forums hinder think tanks&#39; independence, strategic direction, and ability to establish sustainable partnerships and secure diverse funding sources.</li>\n</ul>\n\n<p>To address these challenges and ensure the long‑term sustainability of the ATTP, the AUC seeks a consulting firm to design and recommend an effective endowment structure for the program, based on a comprehensive feasibility study.</p>\n\n<p>The proposed plan should prioritise innovative, practical mechanisms to mobilise and pool resources to secure the long-term financial sustainability of African think tanks. This will help ensure that they continue to generate high-quality policy research that advances the continent&rsquo;s priority development agendas. The proposed design and structure should include:</p>\n\n<ul>\n\t<li><strong>Mapping and analysing the current funding and resource mobilisation landscape for African think tanks</strong>, including revenue patterns, financial sustainability challenges, and gaps in existing financing mechanisms;</li>\n\t<li><strong>Reviewing existing regional and global initiatives aimed at enhancing the financial sustainability of think tanks</strong>, drawing lessons from successful models in other contexts and identifying best practices applicable to the African landscape; and</li>\n\t<li><strong>Assessing the feasibility, design, and governance arrangements for establishing a financing platform</strong> (potentially comprising a general fund and an endowment fund, alongside other complementary mechanisms) to mobilise, manage, and disburse resources effectively and sustainably in support of the ATTP&#39;s operations and policy research activities beyond the World Bank Investment Project Financing (IPF) project duration.</li>\n</ul>\n\n<p>The endowment fund and general fund are expected to attract contributions from diverse sources, including African governments, private-sector organisations, foundations, institutional donors, diaspora networks, and other well-wishers. The platform&#39;s design should ensure diversified, African-owned revenue streams that reduce dependency on short-term external grants while maintaining flexibility to respond to evolving policy research priorities across the ATTP&#39;s six thematic areas: economic transformation and governance, climate change, regional trade, food security, human capital, and digitalisation. While these Terms of Reference refer to an &quot;<strong><em>endowment fund and general fund</em></strong>&quot; as the baseline financing architecture, the mandate is to assess the full spectrum of sustainable financing options and recommend the optimal combination of mechanisms based on feasibility analysis, stakeholder consultations, alignment with AUC financial rules, and Member State preferences.</p>\n\n<p>The feasibility study shall assess at least two implementation scenarios for the financing platform: (i) an AUC-hosted model as the baseline; and (ii) a non-AUC host model (e.g., an autonomous AU-affiliated foundation or agency, REC-hosted vehicle, or special-purpose entity). For each scenario, the study should thoroughly examine legal permissibility, governance and decision rights, fiduciary arrangements, operational capacity, cost and timeline implications, and a phased transition roadmap. In addition to the comparative analysis, the study should provide clear recommendations on the most suitable option(s) based on evidence, stakeholder input, and contextual needs. Furthermore, the Consulting Firm is encouraged to apply independent, critical thinking in their analysis and may propose alternative or hybrid models if these are supported by the feasibility findings and align with the long-term objectives of the financing platform.</p>\n\n<p>The assignment is divided into two phases: <strong>Phase I: Feasibility Study</strong> and <strong>Phase II: Resource Mobilisation</strong>.</p>\n\n<p>​​​​​​​<strong><em>Phase I: Landscape analysis and feasibility assessment</em></strong></p>\n\n<p>During this phase, the consultancy will:</p>\n\n<ul>\n\t<li><strong>Conduct a comprehensive landscape analysis </strong>mapping the current funding ecosystem for African think tanks, including revenue sources, financial sustainability models, donor dependencies, and existing gaps in financing mechanisms</li>\n\t<li><strong>Review regional and global comparators, </strong>analysing successful initiatives that have enhanced think tank financial sustainability in other contexts (e.g., research councils, endowment models, pooled funding mechanisms, innovative financing approaches) to extract lessons learned and best practices</li>\n\t<li><strong>Assess the feasibility of establishing a sustainable financing platform</strong> for the ATTP, potentially comprising a general fund, an endowment fund, and other complementary mechanisms. This assessment will:\n\t<ul>\n\t\t<li>Evaluate the AUC&#39;s financial rules and procedures for compatibility with different financing mechanisms</li>\n\t\t<li>Evaluate feasibility under different hosting scenarios, including an AUC-hosted model and alternative arrangements (e.g., autonomous foundation/agency, REC-hosted vehicle, or independent special-purpose entity), assessing the implications of each for legal permissibility, governance, fiduciary arrangements, and operational capacity.</li>\n\t\t<li>Assess the potential funding landscape and indicative capitalisation scenarios, drawing on existing data on donor and funder contributions to African think tank support, policy research, and related knowledge sector initiatives. Estimate potential contribution levels from different funder categories (e.g., African governments, development partners, foundations, private sector, diaspora) based on existing funding patterns and comparable initiatives.</li>\n\t\t<li>Assess financial, operational, governance, legal/regulatory, and reputational risks associated with different financing mechanisms</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li><strong>Provide recommendations on design, governance, and operational frameworks </strong>for the financing platform and its constituent mechanisms, ensuring transparency, accountability, and alignment with AUC priorities and African Union institutional reform objectives</li>\n</ul>\n\n<p>The deliverable will be a <strong>Final Feasibility Study Report</strong> that synthesises the landscape analysis, comparative review, and feasibility assessment into actionable recommendations for establishing the ATTP endowment and general fund.</p>\n\n<p>​​​​​​​<strong><em>Phase II: Resource Mobilisation Strategy Development</em></strong></p>\n\n<p><strong>Phase II shall commence only upon formal written approval by the AUC of the Final Feasibility Study Report (D1.3).</strong>&nbsp;The ATTP Secretariat will coordinate technical review and consolidation of comments, but final approval rests with the AUC. During this phase, the consultancy will develop a robust, multi-faceted resource mobilisation strategy and sustainability plan to secure financing and capitalisation for the platform&#39;s various mechanisms, ensuring long-term viability.</p>\n\n<p>The resource mobilisation strategy should:</p>\n\n<ul>\n\t<li><strong>Identify and map diverse stakeholder groups, </strong>including African governments, private sector entities, foundations, institutional donors, diaspora networks, and individual philanthropists, with tailored engagement approaches for each.</li>\n\t<li><strong>Develop mechanism-specific mobilisation strategies </strong>covering endowment capitalisation, annual contributions to the general fund, corporate partnerships, philanthropic engagement, innovative financing vehicles, and revenue-generating activities.</li>\n\t<li><strong>Propose phased implementation </strong>with near-term (0-2 years), medium-term (3-5 years), and long-term (5+ years) targets and milestones.</li>\n\t<li><strong>Include coordination mechanisms </strong>ensuring that different revenue streams complement rather than compete with each other.</li>\n\t<li><strong>Outline capacity requirements </strong>for AUC staff and ATTP Secretariat to manage resource mobilisation efforts effectively.</li>\n\t<li><strong>Define monitoring and evaluation frameworks </strong>to track progress, measure impact, and assess the effectiveness of different financing mechanisms and stakeholder engagement strategies.</li>\n\t<li><strong>Recommend strategies for ensuring long-term sustainability, </strong>including approaches to diversify funding sources, mitigate financial risks, build African ownership, and progressively reduce dependence on external financing.</li>\n</ul>\n\n<p>The strategy should outline practical approaches to engaging stakeholders and to ensure sustainable financing to support the think tank platform&#39;s operations and policy research activities aligned with the ATTP&#39;s priority themes.</p>\n\n<p><strong>2. Scope of Work</strong></p>\n\n<p>The consultancy will be delivered in two phases, totalling <strong>180 working days</strong> (approximately 6 months), to ensure timely delivery while maintaining quality and effective stakeholder engagement.</p>\n\n<ul>\n\t<li><strong>Phase I</strong>:&nbsp;<strong>~90 working days</strong>&nbsp;(within the 3-month total), including&nbsp;<strong>10 working days</strong>&nbsp;for the Inception Report and&nbsp;<strong>~80 working days</strong>&nbsp;to deliver the Draft and Final Feasibility Study Reports.</li>\n\t<li><strong>Phase II</strong>:&nbsp;<strong>~90 working days</strong>&nbsp;(within the 3-month total), including&nbsp;<strong>10 working days</strong>&nbsp;for the Inception Report and&nbsp;<strong>~80 working days</strong>&nbsp;to deliver the Draft and Final Resource Mobilisation Strategy.</li>\n</ul>\n\n<p>The deliverables are consolidated and restructured as follows:</p>\n\n<ul>\n\t<li><strong>Phase I Deliverables (3):</strong>&nbsp;(i) Inception Report, (ii) Draft Feasibility Study Report, (iii) Final Feasibility Study Report.</li>\n\t<li><strong>Phase II Deliverables (3):</strong>&nbsp;(i) Inception Report, (ii) Draft Resource Mobilisation Strategy, (iii) Final Resource Mobilisation Strategy.</li>\n</ul>\n\n<p><strong>Summary of Phase I Tasks</strong></p>\n\n<p>The consulting firm will undertake the following main tasks during <strong>Phase I</strong>:</p>\n\n<p>​​​​​​​<strong><em>Phase I Inception Report</em></strong></p>\n\n<ul>\n\t<li>Outline the objectives, approach, and work plan for Phase I, including stakeholder engagement, risk analysis approach, and alignment with AUC financial rules and procedures.</li>\n\t<li>Define key activities for: (i) assessing existing AUC frameworks; (ii) reviewing relevant fund models; and (iii) developing feasibility options for the ATTP financing platform (endowment and general fund or other feasible architecture emerging from assessment).</li>\n\t<li>Provide a roadmap for producing the Draft and Final Feasibility Study Reports, including validation moments, quality assurance steps, and decision points.</li>\n</ul>\n\n<p><strong><em>Draft Feasibility Study Report</em></strong></p>\n\n<p>The Draft Feasibility Study Report will consolidate and present findings and initial recommendations covering, at a minimum:</p>\n\n<ul>\n\t<li><strong>Assessment of AUC Financial Rules and Procedures:</strong>&nbsp;compatibility with establishing/operating the proposed fund(s); gaps, constraints, and opportunities.</li>\n\t<li><strong>Review of Existing Fund Models and Financing Mechanisms:</strong>&nbsp;comparative review across AUC-managed funds, Pan-African mechanisms, national precedents, and global comparators; mapping of think tank funding flows/business models; best practices and lessons learned; systemic constraints to sustainability and growth.</li>\n\t<li><strong>Proposed Operating/Operational Mechanisms (feasibility-level):</strong>&nbsp;initial operational procedures aligned to the recommended architecture (not assuming a predetermined structure), including grant-making approach, eligibility, decision-making allocation, financial management/disbursement, reporting, transparency/accountability measures, and monitoring mechanisms.</li>\n\t<li><strong>Stakeholder Engagement Synthesis (interim):</strong>&nbsp;key insights from consultations informing feasibility choices and design preferences.</li>\n\t<li><strong>Risk Analysis (initial):</strong>&nbsp;key risks (financial, operational, governance, legal/regulatory, reputational) and preliminary mitigation measures.</li>\n\t<li><strong>Comparative Institutional Scenario Analysis:</strong>&nbsp;covering&nbsp;<strong>an AUC-hosted platform and at least one non-AUC host option</strong>, including pros/cons, compliance with AUC rules, contribution suitability (governments/private sector/foundations/diaspora), domicile/tax considerations, and decision criteria.</li>\n\t<li><strong>Draft Investment Policy Statement (IPS) Outline (where an endowment is recommended):</strong>&nbsp;objectives, risk tolerance, liquidity, strategic asset allocation ranges, benchmarks, spending policy, rebalancing, ESG/impact, manager selection/oversight, reporting patterns.</li>\n</ul>\n\n<p><strong><em>Final Feasibility Study Report</em></strong></p>\n\n<ul>\n\t<li>Incorporate written comments from ATTP Secretariat and key stakeholders on the draft feasibility report.</li>\n\t<li>Include a&nbsp;<strong>change log</strong>&nbsp;summarising how comments were addressed.</li>\n\t<li>Present the refined feasibility conclusions, recommended institutional option, governance/operating model, risk mitigation plan, scenario analysis, and implementation roadmap.</li>\n\t<li>Submission of D1.3 shall be in both English and French and will constitute the approval gate for commencement of Phase II,&nbsp;<strong>subject to formal written approval by the AUC</strong>.</li>\n</ul>\n\n<p><strong>Detailed Description of Phase I Tasks</strong></p>\n\n<p>The allocated effort for completing Phase I tasks is <strong>90 working days</strong>. Below is a detailed description of each task and level of effort.</p>\n\n<p>​​​​​​​<strong><em>Phase I Inception Report</em></strong></p>\n\n<p>At the start of Phase I, the consulting firm will draft the Inception Report outlining the methodology, timelines, and approach for completing Phase I deliverables. The consulting firm shall present the inception report to the ATTP Project Secretariat and key stakeholders for review and approval. The presentation should include the proposed objectives, methodology, and timeline.</p>\n\n<ul>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>10 working-days</strong>, including 1 week for methodology development and 1 week for drafting and submission.</li>\n</ul>\n\n<p><strong><em>Draft Feasibility Study Report</em></strong></p>\n\n<p>This deliverable consolidates the work previously described under assessment of AUC financial rules/procedures; review of existing fund models; development of operational mechanisms; stakeholder engagement synthesis; and risk analysis (initial), including the required comparative institutional scenario analysis and draft IPS outline (as applicable).</p>\n\n<ul>\n\t<li>The consulting firm will conduct document review, targeted interviews, comparative analysis, and prepare a draft report for validation with the ATTP Secretariat and stakeholders.</li>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>60 working days</strong>.</li>\n</ul>\n\n<p><strong><em>Final Feasibility Study Report</em></strong></p>\n\n<p>Following receipt of written comments on the draft feasibility report, the consulting firm shall revise and finalise the report, including a change log, and deliver a final presentation and submit the Final Feasibility Study Report for&nbsp;<strong>formal written approval by the AUC</strong>. Submission will be in English and French.</p>\n\n<ul>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>20 working days</strong>.</li>\n</ul>\n\n<p><strong>Summary of Phase II Tasks</strong></p>\n\n<p>Upon successful completion of Phase I and subject to AUC approval, the consulting firm will undertake <strong>Phase II</strong> to develop a resource mobilisation strategy for the ATTP fund(s), consistent with the feasibility conclusions and the selected institutional/hosting scenario. The consulting firm will undertake the following main tasks during <strong>Phase II</strong>:</p>\n\n<p>​​​​​​​<strong><em>Phase II Inception Report</em></strong></p>\n\n<ul>\n\t<li>Outline the objectives, methodology, and work plan for Phase II, focusing on stakeholder engagement, risk considerations for mobilisation, and alignment with AUC financial rules and procedures.</li>\n\t<li>Define tasks for operationalising the selected governance/hosting model (as relevant to mobilisation), refining assumptions, and addressing emerging priorities.</li>\n\t<li>Provide a structured plan for delivering the Draft and Final Resource Mobilisation Strategy, including milestones, validation points, and a consultation plan.</li>\n</ul>\n\n<p><strong><em>Draft Resource Mobilisation Strategy</em></strong></p>\n\n<p>The Draft Resource Mobilisation Strategy will cover and consolidate the work previously described under governance (mobilisation-relevant elements), stakeholder mapping/engagement, funding mechanisms, capacity building considerations (mobilisation function), monitoring indicators for mobilisation, and sustainability planning, including:</p>\n\n<ul>\n\t<li><strong>Fund purpose and governance (mobilisation-relevant):</strong>&nbsp;objectives, mobilisation-related roles, decision rights, coordination mechanisms aligned to the selected institutional scenario.</li>\n\t<li><strong>Stakeholder mapping and engagement:</strong>&nbsp;identification and segmentation of potential contributors (Member States, private sector, foundations, donors, diaspora, individuals) with tailored engagement strategies and pipeline approach.</li>\n\t<li><strong>Funding mechanisms:</strong>&nbsp;assessment of instruments (including diaspora bonds/philanthropy, ESG-linked contributions, blended finance, outcome-based financing, memberships/fee-for-service, premium products, pooled special funds), including feasibility, alignment with AUC rules, potential quantum, risk profile, appetite, and implementation steps.</li>\n\t<li><strong>Resource mobilisation plan:</strong>&nbsp;timelines, milestones, KPIs, targets, coordination across fund windows (endowment/general fund or recommended structure).</li>\n\t<li><strong>Capacity strengthening (mobilisation):</strong>&nbsp;practical recommendations to strengthen AUC/host capacity to deliver the mobilisation strategy.</li>\n\t<li><strong>Monitoring, learning and adaptation:</strong>&nbsp;mobilisation-focused indicators, reporting cadence, and feedback loops to adjust strategy.</li>\n\t<li><strong>Sustainability approach:</strong>&nbsp;diversification, risk mitigation, and periodic review/update mechanisms.</li>\n</ul>\n\n<p><strong><em>Final Resource Mobilisation Strategy</em></strong></p>\n\n<ul>\n\t<li>Incorporate stakeholder feedback and written comments on the draft strategy.</li>\n\t<li>Provide the final strategy with a concise change log and an implementation-ready roadmap (actions, owners, sequencing, and near-term mobilisation priorities).</li>\n</ul>\n\n<p><strong>Detailed Description of Phase II Tasks</strong></p>\n\n<p>The allocated effort for completing Phase II tasks is <strong>90 working days</strong>. Below is a detailed description of each task and level of effort.</p>\n\n<p>​​​​​​​​​​​​​​<strong><em>Phase II Inception Report</em></strong></p>\n\n<p>At the start of Phase II, the consulting firm will draft the Inception Report outlining the detailed approach, updated timelines, and methods for completing Phase II deliverables. The consulting firm shall present the inception report to the ATTP Secretariat and key stakeholders. Stakeholder feedback will be incorporated into the final report.</p>\n\n<ul>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>10 working-days</strong>, including 1 week for methodology development and 1 week for drafting and submission.</li>\n</ul>\n\n<p><strong><em>Draft Resource Mobilisation Strategy</em></strong></p>\n\n<p>The consulting firm will develop and present the draft strategy, based on targeted consultations (including Member State Permanent Representatives in Addis Ababa, Ministries of Finance where relevant, development partners, foundations, private sector, and diaspora channels as appropriate), and incorporate feasibility constraints/choices from Phase I.</p>\n\n<ul>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>60 working days</strong>.</li>\n</ul>\n\n<p><strong><em>Final Resource Mobilisation Strategy</em></strong></p>\n\n<p>The consulting firm shall revise the draft strategy based on inputs received, finalise the report, and present the final strategy to the AUC (coordinated by the ATTP Secretariat) for confirmation/approval.</p>\n\n<ul>\n\t<li><strong>Estimated LOE:</strong>&nbsp;<strong>20 working days</strong>.</li>\n</ul>\n\n<p>While consultancies are required to submit a technical and financial proposal covering both phases, we recognise that the detailed scope, methodology, and team composition for Phase II will be informed by the findings and recommendations of Phase I. Accordingly, at the commencement of Phase II, the consulting firm may propose reasonable adjustments to the Phase II approach, staffing, and work plan through the Phase II Inception Report (D2.1), provided such adjustments are consistent with the overall objectives of the assignment, remain within the contracted budget ceiling, and are approved in writing by the ATTP Secretariat.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Indicative Stakeholder Engagement Framework</strong></p>\n\n<p>Stakeholder engagement is central to the quality and credibility of both the feasibility study and the resource mobilisation strategy. To ensure comparability across proposals and realistic budgeting for the consultation effort, consulting firms should plan their stakeholder engagement using the following indicative framework.</p>\n\n<p><strong>Minimum key informant interviews: </strong>The consulting firm should plan for a minimum of 20 to 25 key informant interviews across both phases, distributed indicatively as follows:</p>\n\n<ul>\n\t<li>AUC officials and ATTP Secretariat staff, including relevant senior management and directorates (e.g., CDCP, PMRMD, Finance, Legal) and implementing partners (ACBF, AUDA-NEPAD).</li>\n\t<li>AU Member State representatives, drawn from a regionally balanced sample.</li>\n\t<li>Development partners with existing or potential interest in supporting the African think tank sustainability (e.g., World Bank, bilateral donors, multilateral agencies).</li>\n\t<li>Private sector entities, foundations, or philanthropic organisations with a track record in supporting policy research, knowledge generation, or endowment-style financing in Africa or comparable contexts.</li>\n\t<li>Diaspora networks, innovative finance actors, or other non-traditional funding sources with potential relevance to the ATTP financing platform.</li>\n\t<li>Representatives from African think tanks, research institutions, and Regional Economic Communities (RECs) with direct experience of the financing challenges and sustainability models relevant to this assignment.</li>\n</ul>\n\n<p><strong>Validation Workshops:</strong> The consulting firm shall plan for at least one multi-stakeholder validation workshop during the assignment to present draft findings and recommendations for stakeholder input prior to finalisation. The format, timing, and participant list shall be proposed in the relevant Inception Report and agreed upon with the ATTP Secretariat.</p>\n\n<p>The list of key informants above is indicative and intended to establish a common baseline for proposal preparation. The consulting firm may propose adjustments to the composition of stakeholder consultations in the Inception Report, provided such adjustments are clearly justified and approved by the ATTP Secretariat.</p>\n\n<p>The Consultant shall budget for one multi-stakeholder validation workshop. Costs for the workshop are reimbursable and will cover only conference facilities, interpretation (English, French, and Arabic), and logistics for up to 30 participants. The format may be in-person in Addis Ababa. The Consultant is responsible for venue arrangements and logistics, and for ensuring the use of secure platforms that adhere to data protection best practices.</p>\n\n<p><strong>3. Deliverables and Payment Schedule</strong></p>\n\n<p>The AUC estimates that the Consulting firm will need no more than 6 months (180 working days) to complete this assignment (both Phase I and Phase II). The Consulting firm will require no more than <strong>90 working days</strong> to complete <strong>Phase I</strong> deliverables. Upon successful completion of Phase I deliverables, the Consulting firm will require no more than <strong>90 working days</strong> for <strong>Phase II</strong> deliverables.</p>\n\n<p>The AUC also expects the Consulting Firm to be available throughout the entire duration of the services. This includes liaising with the ATTP Project Secretariat and other parties, managing office operations, and ensuring service quality. As part of project management, several meetings between the ATTP Project Secretariat and the Consulting firm may be scheduled at any time. The Consulting firm shall produce meeting minutes of all proceedings. The Consulting Firm shall submit all deliverables to the&nbsp;<strong>ATTP Project Coordinator</strong>&nbsp;for coordination of review.&nbsp;<strong>Final approval of the Final Feasibility Study Report (D1.3) shall be provided by the AUC.</strong></p>\n\n<p>​​​​​​​<strong>Phase I Deliverables</strong></p>\n\n<p>The consulting firm is expected to produce three (3) deliverables during Phase I:</p>\n\n<p>​​​​​​​<strong><em>D1.1: Phase I Inception Report</em></strong></p>\n\n<p>An initial report outlining the consultancy&rsquo;s proposed methodology, work plan, and timeline for conducting the Phase I feasibility work. The report shall include a stakeholder engagement plan, a data collection and validation approach, and research tools (questionnaires/surveys, where applicable; KII guides; FGD protocols, where applicable; and document review frameworks).</p>\n\n<p><strong>(Due: 10 Working Days from contract effectiveness).</strong></p>\n\n<p>​​​​​​​<strong><em>D1.2: Draft Feasibility Study Report</em></strong></p>\n\n<p>A consolidated draft report presenting the feasibility assessment and initial recommendations for the ATTP financing platform. The report shall include, at a minimum:</p>\n\n<ul>\n\t<li>Analysis of AUC financial rules and procedures, including identified gaps, challenges, and opportunities relevant to establishing and operating the recommended fund architecture.</li>\n\t<li>Review of existing fund models and financing mechanisms across AUC-managed funds, Pan-African mechanisms, African national precedents, and global comparators, with lessons learned and implications for ATTP funding design.</li>\n\t<li>Mapping of the current funding ecosystem for African think tanks, including revenue sources, sustainability models, and systemic constraints.</li>\n\t<li>Proposed fund design, governance framework, and operating model (at draft stage), including grant-making approach, eligibility, allocation decision-making processes, financial management/disbursement, reporting requirements, transparency/accountability measures, and monitoring mechanisms&mdash;aligned to the recommended architecture (not assuming a predetermined structure).</li>\n\t<li>Stakeholder engagement synthesis (consultations conducted and key findings).</li>\n\t<li>Risk assessment (financial, operational, governance, legal/regulatory, reputational) with draft mitigation measures and monitoring approach.</li>\n\t<li>Comparative institutional scenario analysis covering an AUC-hosted platform and at least one non-AUC host option, addressing pros/cons, compliance with AUC rules, suitability for receiving contributions (governments, private sector, foundations, diaspora), domicile/tax considerations, fiduciary/operational capacity, and recommended decision criteria.</li>\n\t<li>Draft Investment Policy Statement (IPS) outline for any recommended endowment.</li>\n\t<li>Annexes (as applicable): stakeholder list, interview guides, comparison matrix, and other analytical tools.</li>\n</ul>\n\n<p><strong>(Due: 70 Working days from contract effectiveness).</strong></p>\n\n<p>​​​​​​​<strong><em>D1.3: Final Feasibility Study Report</em></strong></p>\n\n<p>A final report that incorporates written comments from the ATTP Secretariat and key stakeholders on the Draft Feasibility Study Report (D1.2). The report shall include:</p>\n\n<ul>\n\t<li>Refined feasibility conclusions and final recommended financing architecture.</li>\n\t<li>Final recommended fund design, governance framework, and operating model.</li>\n\t<li>Final comparative institutional scenario analysis (AUC-hosted and at least one non-AUC host option) with recommended selection criteria.</li>\n\t<li>Final risk mitigation plan and monitoring/review mechanism.</li>\n\t<li>Final IPS outline (where applicable).</li>\n\t<li>Implementation roadmap.</li>\n\t<li><strong>Change log</strong>&nbsp;summarising how comments on D1.2 were addressed.</li>\n\t<li>Submission of D1.3 shall be in&nbsp;<strong>both English and French</strong>&nbsp;and will constitute the approval gate for commencement of Phase II.</li>\n</ul>\n\n<p><strong>(Due: 90 Working Days from contract effectiveness).</strong></p>\n\n<p>​​​​​​​<strong>Phase II Deliverables</strong></p>\n\n<p>Phase II shall commence upon formal approval of the Final Feasibility Study Report (D1.3) by the AUC. The consulting firm is expected to produce three (3) deliverables during Phase II:</p>\n\n<p>​​​​​​​<strong><em>D2.1: Phase II Inception Report</em></strong></p>\n\n<p>An updated work plan outlining the methodology, timeline, and approach for completing Phase II deliverables, aligned to the selected institutional scenario and financing architecture emerging from Phase I. The report shall include a stakeholder engagement plan (with stakeholder map, engagement objectives, and schedule), data collection instruments, and confirmation of alignment with the ATTP Secretariat on Phase II priorities.</p>\n\n<p><strong>(Due: 10 Working Days from the contract effectiveness of Phase II).</strong></p>\n\n<p>​​​​​​​<strong><em>D2.2: Draft Resource Mobilisation Strategy Report</em></strong></p>\n\n<p>A draft strategy document for securing capitalisation and financing for the ATTP financing platform (consistent with Phase I recommendations). The report shall include, at a minimum:</p>\n\n<ul>\n\t<li>Stakeholder mapping identifying potential contributors (African governments, private sector, foundations, institutional donors, diaspora, and individuals) with tailored engagement strategies and a pipeline approach.</li>\n\t<li>Assessment of diverse funding mechanisms (including diaspora bonds and diaspora philanthropy; ESG-linked corporate contributions; blended finance structures; outcome-based financing/social or impact bonds; membership models/fee-for-service; premium data/insight products; pooled special funds), including feasibility, alignment with AUC rules, potential quantum, risk profile, stakeholder appetite, and implementation steps.</li>\n\t<li>Draft resource mobilisation strategy with phased targets (near-term 0&ndash;2 years, medium-term 3&ndash;5 years, long-term 5+ years), milestones, and KPIs.</li>\n\t<li>Capacity strengthening recommendations to support resource mobilisation (AUC/host and ATTP Secretariat).</li>\n\t<li>Monitoring and evaluation approach for mobilisation performance (aligned to the ATTP Results Framework).</li>\n\t<li>Sustainability considerations: diversification, risk mitigation, and periodic strategy review/update mechanisms.</li>\n\t<li>Implementation roadmap with sequenced actions, responsibilities, and resource requirements.</li>\n</ul>\n\n<p><strong>(Due: 70 Working Days from the contract effectiveness of Phase II).</strong></p>\n\n<p>​​​​​​​<strong><em>D2.3: Final Resource Mobilisation Strategy Report</em></strong></p>\n\n<p>A final strategy document incorporating written comments from the ATTP Secretariat and key stakeholders on D2.2. The report shall include:</p>\n\n<ul>\n\t<li>Final resource mobilisation strategy, updated stakeholder engagement plan, and final recommended mechanisms and sequencing.</li>\n\t<li>Final KPI framework, M&amp;E approach, and sustainability plan.</li>\n\t<li>Implementation-ready roadmap (actions, owners, sequencing, and resourcing).</li>\n\t<li><strong>Change log</strong>&nbsp;summarising how comments on D2.2 were addressed.</li>\n\t<li>Submission of the Final Resource Mobilisation Strategy (D2.3) shall be in <strong>both English and French</strong> and shall be subject to formal written approval by the AUC.</li>\n</ul>\n\n<p><strong>(Due: 90 Working Days from the contract effectiveness of Phase II).</strong></p>\n\n<p>​​​​​​​<strong>Payment Schedule</strong></p>\n\n<p>The Consulting firm shall produce the deliverables outlined in this section to the highest international technical standards, as described in sections 2.1 and 2.3. The actual delivery date for each deliverable will be determined and approved by the AU on the contract&#39;s effective date. It should serve as a foundation for an AU-approved work plan. The formal delivery of all expected deliverables may be conducted electronically.</p>\n\n<p>Draft deliverables (D1.2, D2.2) will be reviewed by the ATTP Secretariat and stakeholders coordinated by the ATTP Project Coordinator.&nbsp;<strong>The AUC is the final approving authority for D1.3 (Final Feasibility Study Report)</strong>&nbsp;and authorises commencement of Phase II in writing</p>\n\n<ul>\n\t<li><strong><em>Phase I Deliverables </em></strong></li>\n</ul>\n\n<table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse; width:620px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:35px; width:56px\">\n\t\t\t<p><strong>Sn.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; width:246px\">\n\t\t\t<p><strong>Deliverable Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; width:227px\">\n\t\t\t<p><strong>Estimated Due Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:35px; width:91px\">\n\t\t\t<p><strong>Payment<br />\n\t\t\t(Per cent)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:56px\">\n\t\t\t<p>D1.1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:246px\">\n\t\t\t<p>Phase I Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:227px\">\n\t\t\t<p>&nbsp;10 Working Days from Contract Effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:91px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:56px\">\n\t\t\t<p>D1.2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:246px\">\n\t\t\t<p>Draft Feasibility Study Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:227px\">\n\t\t\t<p>70 Working Days from Contract Effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:91px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:56px\">\n\t\t\t<p>D1.3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:246px\">\n\t\t\t<p>Final Feasibility Study Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:227px\">\n\t\t\t<p>90 Working Days from Contract Effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:91px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:56px\">&nbsp;</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:246px\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:227px\">&nbsp;</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:.2in; width:91px\">\n\t\t\t<p><strong>100%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong><em>Phase II Deliverables</em></strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:614px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:42px; width:62px\">\n\t\t\t<p><strong>Sn.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:42px; width:240px\">\n\t\t\t<p><strong>Deliverable Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:42px; width:225px\">\n\t\t\t<p><strong>Estimated Due Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:42px; width:87px\">\n\t\t\t<p><strong>Payment<br />\n\t\t\t(Per cent)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; width:62px\">\n\t\t\t<p>D2.1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:240px\">\n\t\t\t<p>Phase II Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:225px\">\n\t\t\t<p>10 Working Days from Contract Effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:87px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; width:62px\">\n\t\t\t<p>D2.2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:240px\">\n\t\t\t<p>Draft Resource Mobilisation Strategy Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:225px\">\n\t\t\t<p>70 Working Days from Contract Effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:87px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; width:62px\">\n\t\t\t<p>D2.3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:240px\">\n\t\t\t<p>Final Resource Mobilisation Strategy Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:225px\">\n\t\t\t<p>90 Working Days from Contract Effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:87px\">\n\t\t\t<p>40%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; width:62px\">&nbsp;</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:240px\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:225px\">&nbsp;</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:87px\">\n\t\t\t<p><strong>100</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>4. Other Applicable Requirements</strong></p>\n\n<ul>\n\t<li><strong>Applicable Labor Management Procedures </strong></li>\n</ul>\n\n<p>Consulting firms engaged under the ATTP Project must comply with the Labour Management Procedures (LMP) outlined in the project framework. Consulting firms must ensure fair treatment, non-discrimination, and equal opportunity for project workers, and promote safe and healthy working conditions. They must adhere to the occupational health and safety (OHS) measures specified in the LMP and establish accessible grievance mechanisms for workers to address workplace concerns promptly and effectively. Compliance with the ATTP Code of Conduct guided by the Environmental and Social Commitment Plan (ESCP) and the Stakeholder Engagement Plan (SEP) is mandatory, including measures to prevent Sexual Exploitation and Abuse (SEA), Sexual Harassment (SH), and workplace discrimination. Consulting firms should also ensure compliance with relevant Ethiopian labour laws when addressing labour-related risks and apply the highest standards when discrepancies arise between national laws and ESS2 requirements.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Applicable Environmental and Social Requirements</strong><strong> </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Consulting firms engaged under the ATTP Project must operate in compliance with the World Bank Environmental and Social Framework (ESF) for Investment Project Financing (IPF), including adherence to Environmental and Social Standard 2 (ESS2) on Labour and Working Conditions. Consulting firms are required to align their operations with the ATTP Environmental and Social Management System, ensuring integration of ESS2 requirements in labour management, occupational health and safety (OHS), stakeholder engagement, and grievance resolution. Consulting firms must adhere to the ATTP Code of Conduct, addressing environmental and social risks, particularly those related to SEA, SH, and workplace discrimination. Furthermore, consulting firms should identify and mitigate potential environmental and social risks associated with their work, including travel, stakeholder interactions, and the technical specifications of deliverables, and ensure compliance with additional ESS requirements where applicable.</p>\n\n<p>​​​​​​​<strong>Applicable Stakeholder Engagement Requirements </strong></p>\n\n<p>Consulting firms engaged under the ATTP Project must comply with the Stakeholder Engagement Plan (SEP) requirements, which align with the World Bank Environmental and Social Standard 10 (ESS10). The SEP emphasises transparent and inclusive stakeholder engagement throughout the project lifecycle to enhance project acceptance and sustainability. Consulting firms are required to identify relevant stakeholders, including disadvantaged and vulnerable groups, disclose project information in a culturally sensitive and appropriate manner, facilitate meaningful consultations, and operate a transparent Grievance Redressal Mechanism (GRM). Monitoring and reporting on engagement activities, as well as addressing stakeholder feedback, are essential to ensuring compliance with SEP guidelines and supporting successful project implementation</p>\n\n<p><strong>5.Management of Services</strong></p>\n\n<ul>\n\t<li><strong>Consulting Firm and Staff</strong></li>\n</ul>\n\n<p>The AUC expects the Consulting firm to provide appropriate key and non-key personnel who will contribute inputs in accordance with the work program. The proposed team shall include at least the key personnel listed below, with specified qualifications and experience. These individuals should be experts who will dedicate significant time to the project or whose contributions are essential to the consultancy. Additional staff and staffing requirements should be suggested by the Consulting firm as needed, based on the proposed methodology and approach to the assignment. The AUC expects all personnel involved to be fluent in English or French during contract execution. All (final) deliverables shall be submitted in both English and French; however, the primary working language for drafting and stakeholder engagement will be English, with final approved deliverables translated into French prior to submission. &nbsp;&nbsp;</p>\n\n<p>Consultants &nbsp;must provide documentary evidence of meeting the minimum firm qualifications, including copies of signed contracts or completion certificates for at least two similar assignments undertaken within the past five years, client reference letters (with contact details) attesting to satisfactory performance, and proof of legal registration. Where proposals are submitted by a consortium or joint venture, the consortium may collectively meet the minimum firm qualifications; the proposal must include a signed consortium agreement outlining roles, responsibilities, and percentage shares, and designate a lead firm authorised to contract with the AUC.</p>\n\n<ul>\n\t<li>​​​​​​​<strong>Key Personnel Qualifications and Experience</strong></li>\n</ul>\n\n<p>The consulting firm must have the following expertise:</p>\n\n<p>​​​​​​​<strong><em>Minimum Firm Qualifications</em></strong></p>\n\n<p>The consulting firm must be a legally registered entity and demonstrate institutional capacity and relevant experience to undertake this assignment. Specifically, the firm must have:</p>\n\n<ul>\n\t<li><strong><em>A proven track record</em></strong>: Successful completion of at least two (2) projects of a similar nature and complexity within the last five (5) years, specifically involving fund governance or innovative endowment and general funds in developing country contexts.</li>\n\t<li><strong><em>Regional Expertise</em></strong>: Demonstrated experience working with African Union stakeholders, e.g., Regional Economic Communities (RECs), and/or African national governments on public financial management or institutional reform.</li>\n</ul>\n\n<p><strong><em>1.Team Leader</em></strong></p>\n\n<p><em><strong>Qualifications and Skills</strong></em></p>\n\n<ul>\n\t<li>Master&rsquo;s degree (those with a higher degree will have an added advantage) in finance, economics, public administration, or a related field.</li>\n\t<li>Strong knowledge of governance structures and operational mechanisms for funds.</li>\n\t<li>Certification in project management or strategic planning is an asset.</li>\n</ul>\n\n<p><em><strong>Professional Experience</strong></em></p>\n\n<ol>\n\t<li>At least 15 years of experience in financial analysis, feasibility studies, and fund design.</li>\n\t<li>Proven ability to lead multi-disciplinary teams and manage complex projects.</li>\n\t<li>Extensive experience in designing resource mobilisation strategies for institutional funds, including engagement with donors, governments, and private sector entities.</li>\n\t<li>Experience in designing and operationalising governance frameworks for funds.</li>\n\t<li>Demonstrated ability to engage with diverse stakeholders, including senior government officials and donors.</li>\n\t<li>Fluency in written and oral communication skills in English or French.</li>\n</ol>\n\n<p><strong><em>2.Finance Expert</em></strong></p>\n\n<p><em><strong>Qualifications and Skills:</strong></em></p>\n\n<ul>\n\t<li>Master&rsquo;s degree (those with a higher degree will have an added advantage) in finance or accounting.</li>\n\t<li>CFA, CPA, or ACCA designation is highly desirable.</li>\n\t<li>Familiarity with international financial standards and practices.</li>\n</ul>\n\n<p><em><strong>Professional Experience:</strong></em></p>\n\n<ol>\n\t<li>At least 10 years of experience in assessing financial frameworks, rules, and procedures.</li>\n\t<li>Proven expertise in financial analysis and fund management, including proficiency in <strong>financial modelling</strong>, forecasting, and performance evaluation.</li>\n\t<li>Significant experience in designing resource mobilisation strategies for institutional funds, including mechanisms to attract contributions from governments, private sector entities, and development partners.</li>\n\t<li>Experience in developing financial models and frameworks for institutional funds.</li>\n\t<li>Experience leading public sector finance work in the sub-Saharan Africa region.</li>\n\t<li>Professional experience in public financial management and implementing public financial management reform within national and sub-national institutions.</li>\n\t<li>Prior experience in donor-funded technical assistance programs for PFM assessments, strategic reforms, and implementation.</li>\n\t<li>Demonstrated experience with public financial management assessments and diagnostic tools (e.g., Tax Administration Diagnostic Assessment Tool [TADAT], Public Expenditure and Financial Accountability [PEFA], Medium Term Fiscal Frameworks [MTFF], Medium Term Budget Frameworks [MTBF], Public Expenditure Reviews [PER], Public Expenditure Tracking Surveys [PETS], Fiscal Risk Assessments [FRA], and budget transparency).</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Fluency in English or French, with excellent reporting skills.</li>\n</ul>\n\n<p>3.<strong><em>Risk Analysis Expert</em></strong></p>\n\n<p><em><strong>Qualifications and Skills</strong></em></p>\n\n<ul>\n\t<li>University degree (those with a higher degree will have an added advantage) in finance, economics, accounting, or a related field.<strong> </strong></li>\n\t<li>Certification in risk management (e.g., FRM, CRMA) is an advantage.</li>\n\t<li>Strong knowledge of risk assessment methodologies for financial projects.</li>\n</ul>\n\n<p><em><strong>Professional Experience</strong></em></p>\n\n<ol>\n\t<li>At least 7 years of experience in conducting risk assessments for complex financial projects.</li>\n\t<li>Proven ability to identify, analyse, and propose mitigation strategies for financial, operational, and governance risks.</li>\n\t<li>Experience working on institutional funds or similar projects.</li>\n\t<li>Strong understanding of endowment risk exposure, including market, governance, and liquidity risks.</li>\n\t<li>Fluency in English or French, with excellent reporting capabilities.</li>\n</ol>\n\n<p><strong><em>4.Stakeholder Engagement Expert</em></strong></p>\n\n<p><em><strong>Qualifications and Skills</strong></em></p>\n\n<ul>\n\t<li>University degree (those with a higher degree will have an added advantage) in public relations, social sciences, or a related field.</li>\n\t<li>Proven expertise in engaging diverse stakeholders, including government entities and donors.</li>\n</ul>\n\n<p><em><strong>Professional Experience</strong></em></p>\n\n<ol>\n\t<li>At least 7 years of experience in stakeholder engagement and communications.</li>\n\t<li>Demonstrated ability to manage relationships with senior government officials, donors, and other stakeholders.</li>\n\t<li>Experience in facilitating consultations and workshops.</li>\n\t<li>Strong diplomacy and cultural awareness skills.</li>\n\t<li>Fluency in English or French, with excellent written and oral communication skills.</li>\n\t<li>Knowledge of the African Union institutional architecture and prior experience engaging AU organs is an asset.</li>\n</ol>\n\n<p>All key personnel named in the proposal are considered essential to the project. Any substitution requires AUC&rsquo;s prior written consent and must involve personnel with equal or superior qualifications and experience. AUC reserves the right to reject any proposed substitutions that do not meet these standards.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Non-Key Staff</strong></p>\n\n<p>This section provides an illustrative list of additional non-key personnel that bidders may include in their teams. It is the bidders&#39; decision to propose additional non-key personnel. However, the Consulting firm shall indicate the proposed experts&rsquo; names, their input, and their position in the technical and financial proposals (please note that the financial proposal shall also indicate these experts&rsquo; fully loaded rates).</p>\n\n<table align=\"center\" cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:313px\">\n\t\t\t<p><strong>Indicative/Illustrative Additional Positions</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:36px; vertical-align:top; width:313px\">\n\t\t\t<ol>\n\t\t\t\t<li>Administrative Assistant</li>\n\t\t\t\t<li>Capacity Building Specialist</li>\n\t\t\t\t<li>Monitoring and Evaluation Specialist</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>Input by the </strong><strong>Consulting firm</strong></p>\n\n<p>The Consulting firm shall be responsible for all necessary staff resources, office space, transportation (local and international), accommodation, stationery, photocopying of documents provided to participants as workshop materials, communications, computers and accessories, translations and interpretation (if needed), and insurance (as applicable). This also covers staff training and other costs related to assigned responsibilities.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reporting Requirements</strong><strong> </strong></p>\n\n<p><strong>The Consulting firm will submit all reports to the ATTP Project Coordinator electronically</strong>. Translation and quality assurance are the responsibility of the Consulting firm and should be accounted for within the proposed work plan and level of effort. The Consulting firm should submit all documents in Microsoft Word, spreadsheets in Microsoft Excel, schedules in Microsoft Project or Microsoft Excel, and digital photo files in JPEG or PNG format. The Consulting firm should submit all presentations in Microsoft PowerPoint format. The AUC and the Consulting firm must agree on any other format(s) the Consulting firm proposes to submit. The Consulting firm should also include the contract number in each report. Additionally, the Consulting firm should submit each report accompanied by a letter or other document that clearly identifies the report.</p>\n\n<p>For deliverables containing periodic data that the AUC will use for ATTP Project Monitoring and Evaluation, the AUC will approve the submission format. All deliverables are considered drafts upon submission. When the AUC identifies areas for correction, the Consulting firm will have ten (10) business days to submit revisions, unless otherwise specified or agreed upon with the AUC. Packaging for all items delivered under this agreement shall comply with commercial standards and be sufficient to ensure acceptance by common carriers and safe arrival at the destination. The Consulting firm should also include the contract number on each package, report, or other deliverable. The Consulting firm shall acknowledge the AUC and the World Bank in any research or reports funded under this Contract.</p>\n\n<p>The Consulting firm shall implement appropriate data protection and confidentiality measures for all information obtained during the assignment, including sensitive financial and governance documents. This includes secure storage, controlled access, and compliance with applicable data protection regulations. The Consulting firm may not disclose confidential information without prior written consent from the AUC and must return or securely destroy sensitive materials upon contract completion, in accordance with AUC instructions.</p>\n\n<p>Draft deliverables may be submitted in English. Final deliverables (D1.3 and D2.3) must be provided in both English and French. Bidders shall include translation and quality assurance costs in their financial proposals. Where validation workshops involve bilingual participants, the Consultant shall provide simultaneous/consecutive interpretation as required; associated costs shall be included in the financial proposal.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Report Types and Schedule</strong></p>\n\n<p>The Consulting firm is expected to submit the following reports as deliverables for <strong>Phases I and II</strong>. Each report must align with the timelines and LOE specified in the TOR and summarised in the table below.</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:115.2%\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in; width:5%\">\n\t\t\t<p><strong>Sn</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.2in; width:15%\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.2in; width:15%\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.2in; width:39%\">\n\t\t\t<p><strong>Minimum Required Content</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.2in; width:11%\">\n\t\t\t<p><strong>Due Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:.2in; width:12%\">\n\t\t\t<p><strong>Estimated LOE<strong>[2]</strong></strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"6\" style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:100%\">\n\t\t\t<p><strong>Phase I Deliverables</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:142px; width:5%\">\n\t\t\t<p>D1.1</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:142px; width:15%\">\n\t\t\t<p><strong>Phase I Inception Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:142px; width:15%\">\n\t\t\t<p>Detailed work plan, methodology, and timeline for Phase I feasibility work</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:142px; width:39%\">\n\t\t\t<p>Objectives and approach; detailed work plan and timeline; stakeholder engagement plan; data collection and validation plan; research tools (questionnaires/survey instruments where applicable, KII guides, FGD protocols where applicable, document review frameworks); quality assurance approach; alignment with AUC financial rules and procedures</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:142px; width:11%\">\n\t\t\t<p><strong>10 Working Days </strong>from contract effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:142px; width:12%\">\n\t\t\t<p><strong>10</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:311px; width:5%\">\n\t\t\t<p>D1.2</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:311px; width:15%\">\n\t\t\t<p><strong>Draft Feasibility Study Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:311px; width:15%\">\n\t\t\t<p>Consolidated draft report presenting feasibility assessment findings and initial recommendations for the ATTP financing platform</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:311px; width:39%\">\n\t\t\t<p>Analysis of AUC financial rules/procedures (gaps, constraints, opportunities); review of existing fund models/financing mechanisms (AUC-managed, Pan-African, national, global) with lessons; mapping of African think tank funding ecosystem (typologies, revenue mix, constraints); proposed draft fund design/governance/operating model (grant-making, eligibility, allocation, FM/disbursement, reporting, transparency/accountability, monitoring); stakeholder engagement synthesis; initial risk assessment and mitigation measures; comparative institutional scenario analysis (AUC-hosted and at least one non-AUC host option, incl. compliance, fiduciary arrangements, domicile/tax considerations, suitability for contributor types, decision criteria); draft IPS outline (if endowment recommended); annexes (stakeholder list, interview guides, comparison matrix, etc.)</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:311px; width:11%\">\n\t\t\t<p><strong>70 Working Days</strong>&nbsp;from contract effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:311px; width:12%\">\n\t\t\t<p><strong>60</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:159px; width:5%\">\n\t\t\t<p>D1.3</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:159px; width:15%\">\n\t\t\t<p><strong>Final Feasibility Study Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:159px; width:15%\">\n\t\t\t<p>Final feasibility study incorporating stakeholder feedback and final recommendations</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:159px; width:39%\">\n\t\t\t<p>Final recommended financing architecture; refined fund design/governance/operating model; final comparative institutional scenario analysis and selection criteria; final risk mitigation and monitoring/review mechanism; final IPS outline (where applicable); implementation roadmap;&nbsp;<strong>change log</strong>&nbsp;documenting responses to comments on D 1.2;&nbsp;<strong>submitted in English and French</strong>&nbsp;and serves as approval gate for Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:159px; width:11%\">\n\t\t\t<p><strong>90 Working Days</strong>&nbsp;from contract effectiveness</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:159px; width:12%\">\n\t\t\t<p><strong>20</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"6\" style=\"background-color:#ccffff; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:.2in; width:100%\">\n\t\t\t<p><strong>Phase II Deliverables</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:1.1in; width:5%\">\n\t\t\t<p>D2.1</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1.1in; width:15%\">\n\t\t\t<p><strong>Phase II Inception Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1.1in; width:15%\">\n\t\t\t<p>Updated work plan, methodology, and timeline for Phase II resource mobilisation strategy work</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1.1in; width:39%\">\n\t\t\t<p>Objectives; methodology refinement; alignment with selected Phase I institutional scenario and financing architecture; stakeholder engagement plan (stakeholder map, objectives, schedule); data collection instruments and templates; validation plan and coordination arrangements with ATTP Secretariat</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1.1in; width:11%\">\n\t\t\t<p><strong>10 Working Days</strong>&nbsp;from the contract effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:1.1in; width:12%\">\n\t\t\t<p><strong>10</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:16px; width:5%\">\n\t\t\t<p>D2.2</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:15%\">\n\t\t\t<p><strong>Draft Resource Mobilisation Strategy Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:15%\">\n\t\t\t<p>Draft strategy for securing capitalisation and financing for the ATTP financing platform</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:39%\">\n\t\t\t<p>Stakeholder mapping and segmentation (Member States, private sector, foundations, donors, diaspora, individuals) with tailored engagement strategies; assessment of funding mechanisms (incl. diaspora bonds/philanthropy, ESG-linked contributions, blended finance, outcome-based financing, membership/fee-for-service, premium products, pooled special funds) with feasibility, alignment with AUC rules, potential quantum, risk profile, appetite, implementation steps; draft phased mobilisation targets (0&ndash;2, 3&ndash;5, 5+ years), milestones, KPIs; capacity strengthening recommendations (mobilisation function); mobilisation M&amp;E approach aligned to ATTP Results Framework; sustainability approach (diversification, risk mitigation, periodic review); implementation roadmap (sequenced actions, responsibilities, resourcing)</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:11%\">\n\t\t\t<p><strong>70 Working Days</strong>&nbsp;from the contract effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:12%\">\n\t\t\t<p><strong>60</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:88px; width:5%\">\n\t\t\t<p>D2.3</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:88px; width:15%\">\n\t\t\t<p><strong>Final Resource Mobilisation Strategy Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:88px; width:15%\">\n\t\t\t<p>Final strategy incorporating written comments and validation outcomes</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:88px; width:39%\">\n\t\t\t<p>Final mobilisation strategy and finalised mechanism mix/engagement plan; final KPIs and M&amp;E approach; final sustainability plan; implementation-ready roadmap;&nbsp;<strong>change log</strong>&nbsp;documenting responses to comments on D 2.2;&nbsp;<strong>submitted in English and French</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:88px; width:11%\">\n\t\t\t<p><strong>90 Working Days</strong>&nbsp;from the contract effectiveness of Phase II</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:88px; width:12%\">\n\t\t\t<p><strong>20</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>Review and Approval Process</strong></p>\n\n<ul>\n\t<li>The ATTP Project Secretariat and key stakeholders shall review each submission and provide feedback within <strong>10 working days</strong>.</li>\n\t<li>The Consulting firm shall address comments and submit a revised version for <strong>final approval</strong>.</li>\n\t<li>Any changes to the reporting schedule or format must be agreed upon in writing between the AUC and the Consulting firm.Bottom of Form</li>\n\t<li>Phase II will commence once AUC provides formal approval on Deliverable D1.3.</li>\n</ul>\n\n<p><strong>6. Facilities and Equipment</strong></p>\n\n<p><strong>Costs, Facilities, and Equipment to be Provided by the </strong><strong>Consulting firm</strong></p>\n\n<p>Except as specified in the General Conditions of Contract (GCC) and the Special Conditions of Contract (SCC), all costs associated with fulfilling this contract are to be assumed and borne by the Consulting firm. The primary duty location of the Consulting firm&rsquo;s team shall be Addis Ababa, Ethiopia. The Consulting firm must be present in the country during the performance period. The Consulting firm shall also ensure appropriate transportation that meets the assignment requirements. The Consulting firm shall, where applicable, be responsible for providing comprehensive insurance coverage for personnel.&nbsp;</p>\n\n<p>The Consulting Firm shall ensure a minimum of 20 in-country working days across both phases, including at least one in-person multi-stakeholder validation workshop in Addis Ababa. All travel, visas, per-dems, local transport, logistics, and duty-of-care/security arrangements are the responsibility of the Consulting Firm. The Consultant shall maintain, at a minimum, professional indemnity, general liability, and employer&rsquo;s liability/worker&rsquo;s compensation insurance in amounts adequate to cover the obligations under this Contract.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Costs, Facilities, and Equipment to be Provided by </strong><strong>the African Union</strong></p>\n\n<p>The African Union will cover all labour costs for its officials, as their project engagement is part of their regular work duties. For example, this includes the time officials spend reviewing and validating deliverables and reports prepared by the Consulting firm, as well as interim and final sign-offs when needed, for recommendations the Consulting firm may make regarding the implementation of tasks outlined in these Terms of Reference.&nbsp;</p>\n\n<p>The ATTP Secretariat will provide the Consulting firm with the following information and support:</p>\n\n<ol>\n\t<li>Access relevant reports, legal documents, and other necessary documents related to the Africa Think Tank Platform Project that may already be available. All bidders are encouraged to review the ATTP documents available on the World Bank website: https://projects.worldbank.org/pt/projects-operations/project-detail/P179804 &nbsp;</li>\n\t<li>Letters of introduction to facilitate access to various stakeholders whose activities and roles are essential to the mission of the Consulting firm.</li>\n\t<li>Assist in issuing visas for entry and exit for the Consulting firm&#39;s expatriate staff.</li>\n\t<li>Facilitation of issuance of any permit required for personnel of the Consulting firm to perform their tasks in Ethiopia.</li>\n\t<li>Share the TOR and relevant draft deliverables with AUDA-NEPAD and ACBF and facilitate introductions to focal points to enable timely technical feedback.</li>\n\t<li>The ATTP Project Coordinator will serve as the Point of Contact for this assignment.</li>\n</ol>\n\n<p>The AUC will provide timely access to relevant policies, financial rules, legal instruments, and contacts. The AUC and ATTP Secretariat will provide consolidated comments on deliverables within 10 working days and facilitate introductions for key informant interviews within 10 working days of request. Delays in client-controlled inputs will extend associated timelines on a no-fault basis.</p>\n\n<p>&nbsp;</p>\n\n<p>[1] For instance, the Ministerial Committee on the Implementation of Agenda 2063.</p>\n\n<p>[2] Note: the extra LOE per deliverable is assigned to stakeholder engagement execution, iterative validation, drafting/quality assurance, and translation coordination.</p>\n\n<p>&nbsp;</p>"},{"id":"OP00372460","notice_type":"Request for Expression of Interest","noticedate":"08-Aug-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-08-14T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Uzbekistan","project_id":"P504420","project_name":"INnovative SOcial Protection System for inclusiON of Vulnerable People Project","bid_reference_no":"UZ-INSON-CS-IC-2.1.1.3","bid_description":"Expert on developing a national social taxonomy of Uzbekistan.","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Tashkent city, Mirabad district, A. Temur street, 17a","contact_ctry_name":"Uzbekistan","contact_email":"d.gafarov@ihma.uz","contact_name":"Dilshod Gafarov","contact_organization":"NATIONAL AGENCY FOR SOCIAL PROTECTION UNDER THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN","contact_phone_no":"998 50 012 67 78","contact_web_url":"https://ihma.uz/","submission_date":"2025-08-08T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; INDIVIDUAL CONSULTANT SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><em><u>Country</u></em><u>:</u><strong> The Republic of Uzbekistan</strong></p>\n\n<p><em><u>Implementation Agency:</u></em><strong> National Agency for Social Protection (NASP) under the President of the Republic of Uzbekistan</strong></p>\n\n<p><em><u>Name of Project:</u></em> <strong>&ldquo;Innovative Social Protection System for Inclusion of Vulnerable Populations&rdquo; (INSON)</strong></p>\n\n<p><strong>Financial Agreement No. 75550-UZ / Grant Agreement No. TF C4589-UZ</strong></p>\n\n<p><em><u>Assignment</u></em><em><u> Title:</u></em> <strong>Expert on developing a national social taxonomy of Uzbekistan</strong></p>\n\n<p><em><u>Reference No. (as per Procurement Plan):</u></em><strong> U</strong><strong>Z-INSON-CS-IC-2.1.1.3.</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Republic of Uzbekistan has received financing from the World Bank toward the cost of the <strong>&ldquo;Innovative Social Protection System for Inclusion of Vulnerable Populations&rdquo; (INSON) </strong>project and intends to apply part of the proceeds for consulting services.</p>\n\n<p><strong>Objectives of the Assignment </strong></p>\n\n<p>A 2018 report from the UN&#39;s Intergovernmental Panel on Climate Change found that achieving net zero emissions globally by 2050 is critical to avoiding some of the worst effects of climate change. Following the unprecedented market and policy momentum behind ESG in 2021, investors, corporate boards, and government leaders have raised expectations for progress on climate pledges in 2022.</p>\n\n<p>Uzbekistan has taken some important initial steps to catch up with the global ESG trend. The Government of Uzbekistan made a strong commitment towards transition to a green economy[1] to ensure that the country&rsquo;s change is balanced in ecological, social, governmental and economic terms. Besides Uzbekistan&rsquo;s commitment to the UN&lsquo;s 17 Sustainable Development Goals[2] and ratification of Paris Agreement on climate[3] , as well as UN General Assembly draft resolution &ldquo;On World Social Summit&rdquo;[4] the government has been working with a number of international organizations on formulating the country&rsquo;s green growth strategic framework and established the strong coordination platform for both Government entities and donor community, advancing green practices in agriculture, urban development, energy and other. A national green taxonomy has been approved by Government in 2023 with a scheme of classification of green projects. National Agency for Social Protection under the President of Uzbekistan (NASP) has been tasked to develop a national social taxonomy by mid of 2025[5]. Please click here for details https://docs.google.com/document/d/1NSd1xSF0LVTyzAxWdoBLNnc_QmwGs7YY/edit?usp=sharing&amp;ouid=117305845286127924819&amp;rtpof=true&amp;sd=true.</p>\n\n<p><u>The Consultant is expected to carry out the following tasks:</u></p>\n\n<p>The consultant will undertake the following tasks:</p>\n\n<ol>\n\t<li><strong>Preparatory works:</strong>\n\n\t<ol>\n\t\t<li>Conduct desk review to identify, understand and summarize Uzbekistan&rsquo;s new policies and strategic objectives in social sphere;</li>\n\t\t<li>Based on national policy priorities develop data collection means for analysis (template forms, questionnaires, discussion topics with invlovded ministries, agencies, and business) to identify key metrics (baseline, targets, risks) ;</li>\n\t\t<li>Conduct desk research and identify relevant tax, customs, financial, legal and other incentives and state support measures provided for private sector corporations if involved in delivering social projects or tasks;</li>\n\t\t<li>Review recent trends and experiences in subject area of countries close to Uzbekitan&rsquo;s socio-economic development and propose an approach for social taxonomy to be developed in Uzbekistan;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Develop national social taxonomy, including:</strong>\n\n\t<ol>\n\t\t<li>Prepare: (i) a proposed classification of &quot;social&quot; projects organized by a system of social classification codes (SCC) to be financed by &quot;social&quot; bonds and loans, to be implemented on an experimental basis using the National Social Taxonomy; SCC choice is to be decided in consultation with the government. The taxonomy should also propose the metric(s) of social performance for each sector and industry type that could potentially feature in reporting obligations in the future; (ii) develop technical manual consisting of technical background, explanatory notes, and case examples on all qualitative screening criteria, social performance thresholds, technical standards, and metrics that may be used in taxonomy; (iii) summary of findings and data compilation: includes findings of technical discussions with social agencies, expert groups, social policy agencies, and users for establishing the current regulatory environment, and collecting relevant economic and social data. (iii) a suggestion on the need for establishing a sustainable taxonomy by integrating the green and social taxonomies, if relevant.</li>\n\t\t<li>Conduct technical consultations with relevant expects from various sectors of economy to finalize the proposed model of social taxonomy for business entities.</li>\n\t\t<li>Prepare amendments to the legislation to implement the proposed model, including in a form of a draft Cabinet of Ministers Resolution[6];</li>\n\t</ol>\n\t</li>\n\t<li><strong>Develop a tranformational road map (action plan) to implement social taxonomy that shall include:</strong>\n\t<ol>\n\t\t<li>required measures, implementation mechanism and timeline in order to translate social taxonomy into actions (tools for operationalization);</li>\n\t\t<li>present a social taxonomy and a road map for management of National agency for social protections to collect feedback and comments;</li>\n\t\t<li>review collected comments and proposals of engaged ministries and state devpartments and received under public disucssions;</li>\n\t\t<li>revisit draft road map and social taxonomy based on feedback recieved.</li>\n\t</ol>\n\t</li>\n\t<li><strong>Conduct trainings and support in communication, including</strong>\n\t<ol>\n\t\t<li>provide initial government awareness raising and capacity building to equip relevant entities of the government with knowledge and tools to oversee the use of the social taxonomy by developing training materials and conducting a training session for at least 20 representatives of the National agency for social protections (charged with developing the taxonomy) and other releant government bodies to explain basic principles and application of social taxonomy to enable them to effectively contribute to the taxonomy development activity and to taxonomy oversight;</li>\n\t\t<li>facilate a round table for 100 participants of public and private sector to explain objectives of social taxonomy, create awareness among users of their responsibilities and the government&rsquo;s oversight role, that will also include developing training materials and conducting a training workshop for representatives of big and medium private sector companies;</li>\n\t\t<li>develop communication materials summarizing the proposed improvements to support awareness on investments into the social sphere.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>This envisioned schedule shows main activities, with many tasks occurring in parallel. A candidates for individual consultancy should submit a detailed schedule in line with their proposed methodology and approach, with a view towards tasks completion by no later than December 2025.</p>\n\n<p>3. Technical tips</p>\n\n<p>The Consultant shall provide practical technical advice on various issues related to the assistive device rental program and ensure the transfer of knowledge to the NASP employees.</p>\n\n<p>&nbsp;</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment can be downloaded here https://docs.google.com/document/d/1NSd1xSF0LVTyzAxWdoBLNnc_QmwGs7YY/edit?usp=sharing&amp;ouid=117305845286127924819&amp;rtpof=true&amp;sd=true.</p>\n\n<p>The NASP now invites eligible individual consultants (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:100.02%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:2.0pt; vertical-align:top; width:16.7%\">\n\t\t\t<p><strong>Education:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:2.0pt; vertical-align:top; width:83.3%\">\n\t\t\t<ul>\n\t\t\t\t<li>\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong>At least a master&rsquo;s degree in finance, economics, law, social work, or a related field (a Ph.D. in a relevant area is considered an advantage).</strong></li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:27.9pt; vertical-align:top; width:0%\">\n\t\t\t<p><strong>Experience and skills:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.9pt; vertical-align:top; width:0%\">\n\t\t\t<ul>\n\t\t\t\t<li>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>A minimum of 5 years of relevant experience in areas outlined in the Terms of Reference or in the development of green or social taxonomies, sustainable finance/investment attractions, or in external review activity related to ESG-labelled finance instruments, or formulation of related regulations.</li>\n\t\t\t\t\t<li>Knowledge of legislation related to investment attractions into green and social spheres;</li>\n\t\t\t\t\t<li>Experience working on international development projects funded by multilateral organizations;</li>\n\t\t\t\t\t<li>Experience in the drafting of legal and regulatory acts, and related supporting and analitical documentation;</li>\n\t\t\t\t\t<li>Advanced computer skills, as well as strong presentation and written communication skills.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:2.0pt; vertical-align:top; width:16.7%\">\n\t\t\t<p><strong>Language Requirements:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:2.0pt; vertical-align:top; width:83.3%\">\n\t\t\t<ul>\n\t\t\t\t<li>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Proficiency in English is required; knowledge of Uzbek or Russian is an advantage.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Corporate Competencies:</strong></p>\n\n<ul>\n\t<li>Demonstrated integrity, high ethical standards, professionalism, and accountability;</li>\n\t<li>Cultural, gender, religious, racial, national, and age sensitivity and adaptability.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Functional Competencies:</strong></p>\n\n<ul>\n\t<li>Strong integrative thinking and ability to support the Social Protection Authority in achieving the goals of the assignment;</li>\n\t<li>Consistent, energetic, and constructive approach to work;</li>\n\t<li>Openness to change and ability to tackle complex problems.</li>\n\t<li>Ability to collect, synthesize, and integrate inputs from colleagues, partner organizations, and stakeholders. Excellent interpersonal skills, with demonstrated ability to work in teams and multicultural environments with minimal supervision.</li>\n</ul>\n\n<p><strong>Development and Operational Effectiveness:</strong></p>\n\n<ul>\n\t<li>Ability to gather comprehensive information, identify risks, bottlenecks, and opportunities for improvement.</li>\n\t<li>Capacity to work across institutions in collaborative settings;</li>\n\t<li>Diligence and efficiency in fulfilling obligations and achieving results.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.13, 3.15, and 3.16 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; February 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>A Consultant will be selected in accordance with the Individual Consultant Selection method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours:<em> 10-00 to 18-00 hours (Tashkent time</em>).</p>\n\n<p>Expressions of interest supported by CV must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>August 14, 2025</strong>.</p>\n\n<p>&nbsp;</p>\n\n<p>PIU INSON under the NASP</p>\n\n<p>Attn: Mr. Dilshod Gafarov &ndash; procurement specialist</p>\n\n<p>Address: 17, Amir Temur str., Tashkent, Uzbekistan, 100060</p>\n\n<p>E-mail: d.gafarov@ihma.uz &nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>[1]Strategy on Transition of Uzbekistan to a Green Economy in 2019-2030 was approved by the Presidential Resolution dated October 10, 2019 #PP-4477 and set priority areas and target indicators</p>\n\n<p>[2] https://uzbekistan.un.org/en/157674-national-sustainable-development-goals-and-targets-republic-uzbekistan</p>\n\n<p>[3] Law &ldquo;On ratification of the Paris Agreement (Paris, 12-Dec-2015)&rdquo; dated 2 Oct 2018 https://lex.uz/en/docs/3924451</p>\n\n<p>[4] https://undocs.org/en/A/78/L.93 78th session Agenda item 24 (b) Social development: social development, including questions relating to the world social situation and to youth, ageing, persons with disabilities and the family.</p>\n\n<p>[5] See item 4 of Annex 4 to Cabinet&rsquo;s Resolution dated August 6, 2024 #484 https://lex.uz/docs/7051227</p>\n\n<p>[6] See the Resolution of the Cabinet of Ministers of Uzbekistan dated October 10, 2023 #561 &ldquo;On approval of the National Green Taxonomy&rdquo; as a model.</p>"},{"id":"OP00362901","notice_type":"Request for Expression of Interest","noticedate":"29-Jun-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-07-10T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P178566","project_name":"Food Systems Resilience Program for Eastern and Southern Africa","bid_reference_no":"DJ-IGAD-490321-CS-INDV","bid_description":"Consultant to Support Development of a Grievance Redress Mechanism (GRM) Guideline and supporting design of IEC materials for the Program","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Djibouti P.O Box 2653, Ave Georges Clemenceau \nwww.igad.int","contact_ctry_name":"Djibouti","contact_email":"Mohy.Tohami@igad.int","contact_name":"Mohy Tohami","contact_organization":"Intergovernmental Authority on Development","contact_phone_no":"+254712061359","contact_web_url":"www.igad.int","submission_date":"2025-06-29T00:00:00Z","notice_text":"<p><strong>Intergovernmental Authority on Development (IGAD)</strong><strong>-Djibouti</strong></p>\n\n<p><strong>Request for Expression of Interest</strong></p>\n\n<p><strong>(Consulting Services &ndash; Individual Consultant Selection)</strong></p>\n\n<p><strong>Name of project:&nbsp;</strong><strong>FOOD SYSTEMS RESILIENCE PROGRAM FOR EASTERN AND SOUTHERN AFRICA</strong></p>\n\n<p><strong>Project No.: (P178566)</strong></p>\n\n<p><strong>Grant No: IDA-E 0820</strong></p>\n\n<p><strong>Assignment Title: Consultant to Support Development of a Grievance Redress Mechanism (GRM) Guideline and supporting design of IEC materials for the Program</strong></p>\n\n<p><strong>Contract No.: DJ-IGAD-490321-CS-INDV</strong></p>\n\n<p>The Intergovernmental Authority on Development (IGAD) has received financing from International Development Agency (IDA) towards the cost of the Food systems resilience program for Eastern and Southern Africa and intends to apply part of the proceeds of this Grant to payments under this contract: Consultant to Support Development of a Grievance Redress Mechanism (GRM) Guideline and supporting design of IEC materials for the Program</p>\n\n<p>1.The objective of the assignment:</p>\n\n<p>The main purpose of the FSRP-GRM guideline is to enhance project efficiency through a clear and transparent means of receiving, resolving, documenting and reporting complaints as well as provide feedback /data for reference and planning for improvement of the program. Through the FSRP-GRM, the program also expects to create awareness among IGAD and other program beneficiaries as a means of stakeholder engagement. The program GRM will also ensure program related complaints are resolved within a stipulated period that is critical in managing social tension.</p>\n\n<p>2. The specific objectives of the assignment are:</p>\n\n<ol>\n\t<li>Establish/maintain GRM guidelines for the needs of the IGAD FSRP activities,</li>\n\t<li>Receive and resolve varied categories of project related grievances in a timely, appropriate and cost-effective</li>\n</ol>\n\n<ul>\n\t<li>Build trust among project staff, communities and stakeholders in general.</li>\n</ul>\n\n<ol>\n\t<li>Promote organization and program stakeholder empowerment and participation in programdecisions that affect</li>\n\t<li>Ensure proper documentation, prompt, fair and transparent resolution of</li>\n\t<li>Provide feedback mechanism to program affected persons</li>\n</ol>\n\n<p>3.Scope of Services and Specific Tasks</p>\n\n<ol>\n\t<li>Review all FSRP program components and implementation arrangements and update the list ofpotential grievances that are likely be triggered by FSRP program</li>\n\t<li>Extensive review of any other relevant materials on grievance handling such as GRM Hand books of other world bank projects</li>\n</ol>\n\n<ul>\n\t<li>Review the IGAD-FSRP Environmental and Social Commitment Plan (ESCP) and Stakeholder Engagement Plan (SEP) co guidelines on management of Environmental, Social Health andSafety risks in development projects and assess their applicability or parts thereof tomanagement of FSRP Project related environmental and social risks and impacts including Engage with all implementing entities of the FSRP program, including the Agriculture and Environment Division of IGAD, Legal Unit of IGAD, HR-IGAD, and member states, to assess available options for grievance management.</li>\n</ul>\n\n<ol>\n\t<li>Conduct consultative meetings, technical working group meetings, and validation meeting.</li>\n\t<li>Review existing mechanisms for grievance management and their applicability to FSRP-related grievances, especially for indigenous and marginalized groups involved in cross-border consultations or third-party engagements.</li>\n\t<li>Guide on the ideal structure of the FSRP-GRM structure taking into consideration implementationarrangements, technical and geographical scope and</li>\n</ol>\n\n<ul>\n\t<li>Develop the GRM Guideline with structure/format for requisite tools and instruments (Grievance submission form and Log -books).</li>\n\t<li>Develop guidance on the architectural lay out, technical and operational specifications of the GRM &ndash; Web /MIS module.</li>\n</ul>\n\n<ol>\n\t<li>Propose an outline of training materials on grievance management for GMCs including referral of SEA/SH/GBV/VAC related grievances to providers of the MPS in keeping with principles of thesurvivor centered approach (SCA).</li>\n\t<li>Prepare IEC/BCC materials such as brochures and posters that impart knowledge and skills ongrievance management for PIU-staff, IGAD, MSs, and other</li>\n\t<li>Propose a communication and training plan to raise awareness about the GRM among staff and relevant stakeholders.</li>\n</ol>\n\n<ul>\n\t<li>Propose mechanisms in the manual for monitoring the effectiveness of the GRM and reporting on its performance. This should include regular progress reports and feedback mechanisms.</li>\n</ul>\n\n<p>4.Minimum Consultant&rsquo;s qualifications and experience requirements</p>\n\n<ol>\n\t<li>A postgraduate degree in Social Sciences, Social Development, Social Policy, Governance and Human Rights, or any related field.</li>\n\t<li>At least 10 years working with Social Safeguards and social risks including GBV/VAC/SEA Assessments, out of which 4 are for grievance management in World Bank funded projects</li>\n\t<li>Proven and verifiable competency in undertaking similar assignments in IGAD region</li>\n\t<li>Exposure of the relevant safeguards&rsquo; regulatory framework by World Bank and IGAD.</li>\n\t<li>The Consulting Services Contract is expected to be for a period of Three (3) calendar months from the date of commencement, subject to renewal on annual basis throughout the project lifetime upon satisfactory performance.</li>\n\t<li>The Intergovernmental Authority on Development (IGAD) now invites individuals to express their interest in providing the services. Interested individuals must provide information indicating that they are qualified to perform the services (attach curriculum vitae (CV), copies of documentary evidence of Academic qualifications, and Professional Qualifications.</li>\n\t<li>An Individual Consultant will be selected in accordance with the Selection of Individual Consultants method set out in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers dated November 2020 (Regulations).</li>\n\t<li>Interested individuals may obtain further information at the address below from 0900 to 1700 hours East African Time (EAT) from Monday to Friday EAT).</li>\n</ol>\n\n<p>Expression of interest shall be sent by e-mail by July/10/2025&nbsp;at 1700hours EAT to:&nbsp;procurement@igad.int&nbsp;copy:&nbsp;Hassan.salah@igad.int&nbsp;, with subject line &lsquo;&lsquo;<em>FSRP/</em>&nbsp;: Consultant to Support Development of a Grievance Redress Mechanism (GRM) Guideline and supporting design of IEC materials for the Program / Contract No.: DJ-IGAD-490321-CS-INDV</p>"},{"id":"OP00329068","notice_type":"Request for Expression of Interest","noticedate":"17-Dec-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-01-03T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"World","project_id":"P175329","project_name":"Gap Fund Partnership with GCOM","bid_reference_no":"C-1.7, C-2.7 V2","bid_description":"Global Focal Point (Senior Specialist) for Middle East and North Africa","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Boulevard Charlemagne 1, Mezzanine Floor, 1041, Brussels, Belgium","contact_ctry_name":"Belgium","contact_email":"tsantapaola@globalcovenantofmayors.org","contact_name":"Tommaso Santapaola","contact_organization":"Global Covenant of Mayors for Climate and Energy","contact_phone_no":"+32 474 79 34 11","contact_web_url":"https://www.globalcovenantofmayors.org/","submission_date":"2024-12-17T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSION OF INTEREST (REoI)</p>\n\n<p>&nbsp;</p>\n\n<p>Gap Fund - GCOM partnership</p>\n\n<p>&nbsp;</p>\n\n<p>Regional Focal Point for Middle East and North Africa</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>C40 Cities Climate Leadership Group, Inc.</p>\n\n<p>120 Park Avenue, 23rd Floor</p>\n\n<p>New York, NY 10017</p>\n\n<p>United States of America</p>\n\n<p>&nbsp;</p>\n\n<p>Global Covenant of Mayors for Climate &amp; Energy</p>\n\n<p>Boulevard Charlemagne 1 &ndash; Mezzanine Floor</p>\n\n<p>1000 Brussels</p>\n\n<p>Belgium</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>10 December 2024</p>\n\n<p><br />\n&nbsp;</p>\n\n<p><strong>C40 Cities Climate Leadership Group Inc. (&ldquo;C40&rdquo;)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>C40 is a network of nearly 100 mayors of the world&rsquo;s leading cities, who are working to deliver the urgent action needed right now to confront the climate crisis, and create a future where everyone, everywhere can thrive. Mayors of C40 cities are committed to using a science-based and people-focused approach to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities. Through a Global Green New Deal, mayors are working alongside a broad coalition of representatives from labour, business, the youth climate movement and civil society to go further and faster than ever before.&nbsp;</p>\n\n<p>The strategic direction of the organisation is determined by an elected Steering Committee of C40 mayors which is co-chaired by Mayor Sadiq Khan of London, United Kingdom, and Mayor Yvonne Aki-Sawyerr of Freetown, Sierra Leone. Three term Mayor of New York City Michael R. Bloomberg serves as President of the C40 Board of Directors, which is responsible for operational oversight. A nine-person management team, led by Executive Director, Mark Watts, leads the day-to-day management of C40. C40&rsquo;s three core strategic funders are Bloomberg Philanthropies, the Children&rsquo;s Investment Fund Foundation (CIFF) and Realdania.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>To learn more about the work of C40 and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.<br />\n&nbsp;</p>\n\n<p><strong>Global Covenant of Mayors for Climate &amp; Energy</strong></p>\n\n<p>The Global Covenant of Mayors for Climate &amp; Energy (GCOM) is the largest global alliance for city climate leadership, uniting a global coalition of over 13,000 cities and local governments and 100+ supporting partners to take ambitious and measurable climate and energy action. The cities and partners of GCOM share a long-term vision of supporting voluntary action to combat climate change and towards a resilient and low-emission society.&nbsp;</p>\n\n<p>In addition to providing resources and training opportunities, the GCOM gives cities a unified voice on the international stage, ensuring the local level is heard in global policy debates.</p>\n\n<p>The Global Covenant of Mayors is comprised of 13 Regional and National Covenants that support signatory cities in line with local needs. By signing up via their Regional or National Covenant, cities become part of a global movement.</p>\n\n<p>Hence, GCOM serves cities and local governments by mobilizing and supporting ambitious, measurable, planned climate and energy action in their communities by working with city/regional networks, national governments, and other partners to achieve our vision.&nbsp;</p>\n\n<p>Led today by UN Special Envoy on Climate Ambition and Solutions Michael R. Bloomberg and European Commission Executive Vice President Frans Timmermans, the coalition comprises cities across 6 continents and 142 countries, representing over 900 million people or more than 10% of the global population.<br />\nTo learn more about the work of GCOM and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>2. Summary, Purpose and Background of the Project</strong></p>\n\n<p>&nbsp;</p>\n\n<p>About the City Climate Finance Gap Fund:</p>\n\n<p>The City Climate Finance Gap Fund (Gap Fund) launched in September 2020, aims to help cities in developing and emerging countries transition towards low-carbon and climate-resilient pathways. This will be achieved by addressing the critical lack of financing necessary to formulate city climate strategies and analyze key actions, identifying the actions for cities to pursue to enhance their capacities, promoting improved coordination among key stakeholders, and supporting the preparation of projects from planning and strategy development to project concept and pre-feasibility stage.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>About the project:</p>\n\n<p>The project seeks to (i) raise awareness of cities and city networks about the Gap Fund,&nbsp; encompassing the development and dissemination of awareness raising materials, and the delivery of knowledge exchange events to facilitate partnerships and promote low-carbon, climate resilient city development activities; (ii) support cities through outreach activities that include the assessment of cities&rsquo; climate challenges and priorities, and the delivery of knowledge sharing activities, including training and workshops; and (iii) support overall coordination and project implementation.</p>\n\n<p>The project consists of three components, namely: (i) Awareness Raising, (ii) Support to Cities, and (iii) Project Management as described in the following sections.</p>\n\n<p>Component 1: Awareness Raising. This component will support selected cities by carrying out climate awareness activities. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Development and dissemination of awareness raising materials on the existence and operation of the Gap Fund in different regions; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge exchange events with relevant stakeholders to facilitate partnerships and promote low-carbon, climate-resilient city development activities.</p>\n\t</li>\n</ul>\n\n<p>Component 2: Support to Cities. This component will focus on outreach activities to promote low-carbon, climate-resilient city development. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Assessment of cities&rsquo; climate challenges and priorities in connection with developing, financing and implementing climate-smart projects; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge sharing activities, including training and workshops, with relevant stakeholders on existing tools and data available on emissions reduction, climate resilience and energy access quantification.</p>\n\t</li>\n</ul>\n\n<p>Component 3: Project Management. This component will support overall coordination and project implementation. The Global Secretariat at GCOM will function as the Project Implementation Unit (PIU) responsible for overall project monitoring and evaluation, and reporting. The PIU will liaise with the World Bank and EIB Gap Fund Secretariats and work closely with GCOM&rsquo;s regional and national chapters. This component will also finance incremental operating costs.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>Outputs/Work Assignment:</p>\n\n<ul>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional local governments in Gap Fund trainings and events, collaborating with the Gap Fund - GCOM Global team and the Regional Covenant of Mayors in MENA.</p>\n\t</li>\n\t<li>\n\t<p>Provide support during the Gap Fund application process for MENA cities, identifying needs and challenges that can be addressed by Gap Fund technical assistance and reporting findings to the global team.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support to the GCOM-Gap Fund Global team&rsquo;s engagement in the MENA region, in coordination with the Regional Covenant.</p>\n\t</li>\n\t<li>\n\t<p>Conduct dialogues, meetings, interviews, and workshops with local government representatives and stakeholders in MENA cities to raise awareness of the Gap Fund and support the submission of quality Expressions of Interests.</p>\n\t</li>\n\t<li>\n\t<p>Translate relevant Gap Fund materials into Arabic and develop advocacy messages to encourage regional city applications.</p>\n\t</li>\n\t<li>\n\t<p>Facilitate and promote engagement between cities, partners, local governments, and stakeholders to increase awareness and promote low-carbon, climate- resilient city development activities.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to communication products, knowledge-sharing activities, and awareness-raising events, including writing articles, reports, and presentations.</p>\n\t</li>\n\t<li>\n\t<p>Participate in outreach and knowledge exchange activities, supporting the communications team.</p>\n\t</li>\n\t<li>\n\t<p>Overall goal: Raise awareness of the Gap Fund among cities and city networks in the MENA region, improving coordination and implementing low-carbon and climate-resilient city development projects.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The goal is to ensure clear communication and engagement with stakeholders across different regions, languages, and contexts through high-quality, accurate and culturally-sensitive interpretation and translation.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>03. Request for Expression of Interest (REoI) Guidelines</strong></p>\n\n<p>&nbsp;</p>\n\n<p>This Request for Expression of Interest (REoI) represents the requirements for an open and competitive process. Expression of Interest will be accepted until 6:00 pm CET, 3 January 2025. Any expression of interest received after this date and time will not be accepted. All expressions of interest should include clear timetables, how they would work with C40, clear costs and detail on experience in this area.</p>\n\n<p>The expression of interest should give C40 evaluators all the information they need to assess your bid. Please clearly indicate where applicable:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>How your expression of interest is responsive to the Evaluation Criteria;</p>\n\t</li>\n\t<li>\n\t<p>The assumptions you are making about the project;&nbsp;&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Risks you have identified and appropriate mitigation measures;</p>\n\t</li>\n\t<li>\n\t<p>Information about your fee;</p>\n\t</li>\n\t<li>\n\t<p>Proposed timeline of implementation;</p>\n\t</li>\n\t<li>\n\t<p>Any additional support that you need to make the project a success, including any inputs you will need from third parties or C40 staff;</p>\n\t</li>\n\t<li>\n\t<p>Proposed working partnership with C40, including (as applicable) project governance and management, key personnel, key roles and responsibilities, and escalation procedure for issues.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>You must include adequate information about how your costs were calculated to enable evaluation of cost reasonableness.&nbsp;</p>\n\n<p>The expression of interest should clearly indicate the required input from C40 staff, the timeline of implementation, and any required background work or set-up. Furthermore, the submission should show how the respondent intends that the project governance and management should work. This should, as a minimum, cover the proposed working partnership with C40, key roles and responsibilities, reporting, change requests, escalation of issues, sign-off of work stages, and acceptance criteria.&nbsp;</p>\n\n<p>Respondents are also required to set out any risks and assumptions made in planning this work. Where risks are identified appropriate management and mitigation strategies should also be outlined. The expression of interest should include details on how a risk assessment would be completed and what that would include.</p>\n\n<p>If the individual consultant submitting an expression of interest must outsource or contract any work to meet the requirements contained herein, this must be clearly stated in the EoI. Additionally, all costs included in expression of interest must be all-inclusive to include any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p>All costs must be itemized to include an explanation of all fees and costs.</p>\n\n<p>Contract terms and conditions will be negotiated upon selection of the winning bidder for this REoI. All contractual terms and conditions will be subject to review by C40 legal department and will include scope, budget, schedule and other necessary items pertaining to the project.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Supplier Diversity</strong></p>\n\n<p>C40 is committed to supplier diversity and inclusive procurement through promoting equity, diversity and inclusivity in our supplier base. We believe that by procuring a diverse range of suppliers, we get a wider range of experiences and thoughts from suppliers and thus are best able to deliver to the whole range of our diverse cities and the contexts that they operate within.</p>\n\n<p>We strongly encourage suppliers (individuals) that are diverse in terms of age, nationality, gender identity, sexual orientation, physical or mental ability, ethnicity and perspective to put forward a EoI to work with us.</p>\n\n<p>Feel welcome to refer to C40&rsquo;s Equity, Diversity and Inclusion Statement as supplier diversity and inclusive procurement is one element of applying equity, diversity and inclusion to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contract&nbsp;</strong></p>\n\n<p>Please note this is a contract for professional services and not a grant opportunity. Individual consultants unable to accept contracts for professional services should not submit bids. This opportunity will be awarded in line with the World Bank &ndash; Contract for small assignment &ndash; Time based template which is meant for individual consultants.</p>\n\n<p>These terms and conditions are non-negotiable. Organisations unable to accept them as drafted should not submit bids in connection with this opportunity.</p>\n\n<p>If C40 are unable to execute a contract with the winning bidder of this competitive process, we reserve the right to award the contract to the second highest ranked bidder.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Subcontracting</strong><br />\n<br />\nIf the individual consultant submitting an expression of interest needs to subcontract any work to meet the requirements of the expression of interest, this must be clearly stated. All costs included in expression of interest must be all-inclusive of any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p><br />\n<br />\n<br />\n&nbsp;</p>\n\n<p><strong>04. Submission and Timeline</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Request for Expression of Interest Timeline:</p>\n\n<p>&nbsp;</p>\n\n<table>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>REoI Timeline</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>Expected&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Request for EoI sent out</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>10 December 2024&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Deadline for receiving EoI</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Evaluation of EoI received</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>6 - 17 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Short list of individual Consultants: Interviews and assessments</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>20 - 24 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Selection decision made</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Draft Negotiated Contract</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 - 31 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Notification of Award</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 February 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>05. Scope, Objectives and Selection Criteria&nbsp;</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Level: Senior Specialist</p>\n\n<p>Title: Regional Focal Point</p>\n\n<p>Geographical Scope: Middle East and North Africa</p>\n\n<p>Location: Preferable within the MENA region</p>\n\n<p>Expected start date: February 2025</p>\n\n<p>Duration: Fixed term until December 31, 2025</p>\n\n<p>&nbsp;</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>C40 and the Global Covenant of Mayors (GCoM) are partnering with the City Climate Finance Gap Fund (Gap Fund) to raise awareness of the Gap Fund and support cities in accessing this technical assistance. Specifically in the Middle East and North Africa (MENA) region, the objectives of this assignment are:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitate engagement between cities and stakeholders to promote low-carbon and climate-resilient city development in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support for the GCOM-Gap Fund partnership activities and engagement in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional and local governments and relevant partners and stakeholders in activities to raise awareness about the Gap Fund.</p>\n\t</li>\n\t<li>\n\t<p>Deliver workshops and outreach events for cities aiming to accelerate low-carbon development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Provide technical assistance for MENA cities aiming to apply to the Gap Fund, and identify and address city challenges during the Expressions of Interest (EoI) completion process.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Contribute to develop communication products and support knowledge-sharing activities.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Scope of Services, Tasks (Components) and Expected Deliverables</p>\n\n<p>&nbsp;</p>\n\n<p>1. Oversee and work with the MENA Technical advisor on the mapping of key stakeholders in the MENA region, including developing a database of relevant cities, local governments, partners and organizations in MENA involved in climate resilience and mitigation efforts.</p>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Stakeholder database</p>\n\t</li>\n\t<li>\n\t<p>Monthly reports on outreach and awareness-raising activities</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>2. Awareness raising and engagement:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Planning and delivering Gap Fund awareness-raising events for local governments.</p>\n\t</li>\n\t<li>\n\t<p>Develop relationships with city officials and provide support to facilitate low-carbon and climate-resilient development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Organize and deliver information sessions, meetings and workshops.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Meeting/workshop reports</p>\n\t</li>\n\t<li>\n\t<p>Gap Fund training materials</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>3. Implementation support:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Liaise with project partners like Regional Covenant, city associations, city networks and other stakeholders.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to reports and knowledge products on project progress, challenges and recommendations.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Progress reports</p>\n\t</li>\n\t<li>\n\t<p>Presentations</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Reporting Requirements and Time Schedule for Deliverables</p>\n\n<p>(a) Narrative report, including progress on activities and deliverables, to be shared on a monthly basis and to be attached to the monthly invoices submitted;</p>\n\n<p>(b) The report and invoice will need to be submitted via an online form that will be provided to the selected consultant;</p>\n\n<p>(c) Submission deadline: on the 10th day of the following months, for each month of service;</p>\n\n<p>(d) Submission to the following email addresses:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance, tsantapaola@globalcovenantofmayors.org</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer, ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Qualification Requirements for the the Consultant:</p>\n\n<ul>\n\t<li>\n\t<p>Master&#39;s degree in urban studies, planning, economics, environment, climate change, engineering, finance, or other relevant discipline, coupled with at least 8 years of relevant work experience.</p>\n\t</li>\n\t<li>\n\t<p>Strong understanding of sustainable development, urban economics, and climate change issues, and proven ability to share best practices, trends, knowledge, and lessons learned across units, clients, and partners.</p>\n\t</li>\n\t<li>\n\t<p>Demonstrated experience in managing relationships, building consensus among diverse stakeholders (city networks, global NGOs, MDBs, UN Agencies), organizing participatory events (workshops, presentations, learning sessions, webinars), and facilitating effective communication.</p>\n\t</li>\n\t<li>\n\t<p>Excellent communication and presentation skills in English and Arabic, including the ability to convey complex messages succinctly and effectively to a wide range of audiences; fluency in French and one of the main regional languages is an advantage.</p>\n\t</li>\n\t<li>\n\t<p>Strong problem-solving, analytical, workflow management, project management, and task organization skills, with the ability to prioritize interventions, analyze large data sets, identify relevant issues and trade-offs, and provide appropriate recommendations.</p>\n\t</li>\n</ul>\n\n<p><br />\n<br />\n&nbsp;</p>\n\n<p><strong>06. Additional Information</strong></p>\n\n<p>The potential post-holder is asked to submit an EoI including CV and Cover Letter. Please include your estimated daily fee.</p>\n\n<p>The total expected number of days for this role is between 80 and 100 for the duration of the contract, but this might be subject to change.&nbsp;</p>\n\n<p>This position might require travelling and related travel expenses will be covered by the project upon approval.&nbsp;</p>\n\n<p>All costs incurred in connection with the submission of this EoI are non-refundable by C40.&nbsp;</p>\n\n<p><br />\n<strong>07. C40 Policies&nbsp;</strong></p>\n\n<p>C40 expects third parties to able to abide by these C40 policies:</p>\n\n<ul>\n\t<li>\n\t<p>Non-Staff Code of Conduct Policy here</p>\n\t</li>\n\t<li>\n\t<p>Equity , Diversity and Inclusion Policy here</p>\n\t</li>\n\t<li>\n\t<p>Non-Staff Travel and Expenses Policy - here</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>08. &nbsp; &nbsp; Submissions&nbsp;</strong></p>\n\n<p>Each Potential Supplier must submit CV, Cover Letter, and estimated daily fee to the email addresses below by January 3, 2025 before 6:00 pm CET:</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance (GCoM),&nbsp; tsantapaola@globalcovenantofmayors.org&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer (GCoM), ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p>The subject of the email should read as follows: Regional Focal Point for Middle East and North Africa - GCOM-GAP FUND</p>\n\n<p>&nbsp;</p>\n\n<p><strong>09. Client&rsquo;s Input and Counterpart Personnel</strong></p>\n\n<p>&nbsp;</p>\n\n<p>(a) Services, facilities and property to be made available to the Consultant by the Client: email address, internal communication tools, Google Drive tools.</p>\n\n<p>(b) Professional and support counterpart personnel to be assigned by the Client to the Consultant&rsquo;s team: MENA team composed by 2 consultants, including this new role.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Disclaimer</strong></p>\n\n<p>C40 will not accept any liability or be responsible for any costs incurred by Potential Suppliers&nbsp; in preparing a response for this REoI.<br />\n<br />\nNeither the issue of the REoI, nor any of the information presented in it, should be regarded as a commitment or representation on the part of C40 (or any of its partners) to enter into a contractual arrangement. Nothing in this REoI should be interpreted as a commitment by C40 to award a contract to a Potential Supplier as a result of this procurement, nor to accept the lowest price or any tender.<br />\n&nbsp;</p>"},{"id":"OP00329069","notice_type":"Request for Expression of Interest","noticedate":"17-Dec-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-01-03T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"World","project_id":"P175329","project_name":"Gap Fund Partnership with GCOM","bid_reference_no":"C-1.10, C-2.10 REPLACEMENT","bid_description":"Technical Support (Specialist) for Sub Saharan Africa","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Boulevard Charlemagne 1, Mezzanine Floor, 1041, Brussels, Belgium","contact_ctry_name":"Belgium","contact_email":"tsantapaola@globalcovenantofmayors.org","contact_name":"Tommaso Santapaola","contact_organization":"Global Covenant of Mayors for Climate and Energy","contact_phone_no":"+32 474 79 34 11","contact_web_url":"https://www.globalcovenantofmayors.org/","submission_date":"2024-12-17T00:00:00Z","notice_text":"<p><br />\n</p>\n\n<p>REQUEST FOR EXPRESSION OF INTEREST (REoI)</p>\n\n<p>&nbsp;</p>\n\n<p>Gap Fund - GCOM partnership</p>\n\n<p>&nbsp;</p>\n\n<p>Regional Technical Support (City Advisor) for Sub Saharan Africa Region (SSA)</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>C40 Cities Climate Leadership Group, Inc.</p>\n\n<p>120 Park Avenue, 23rd Floor</p>\n\n<p>New York, NY 10017</p>\n\n<p>United States of America</p>\n\n<p>&nbsp;</p>\n\n<p>Global Covenant of Mayors for Climate &amp; Energy</p>\n\n<p>Boulevard Charlemagne 1 &ndash; Mezzanine Floor</p>\n\n<p>1000 Brussels</p>\n\n<p>Belgium</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>10 December 2024</p>\n\n<p><strong>C40 Cities Climate Leadership Group Inc. (&ldquo;C40&rdquo;)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>C40 is a network of nearly 100 mayors of the world&rsquo;s leading cities, who are working to deliver the urgent action needed right now to confront the climate crisis, and create a future where everyone, everywhere can thrive. Mayors of C40 cities are committed to using a science-based and people-focused approach to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities. Through a Global Green New Deal, mayors are working alongside a broad coalition of representatives from labour, business, the youth climate movement and civil society to go further and faster than ever before.&nbsp;</p>\n\n<p>The strategic direction of the organisation is determined by an elected Steering Committee of C40 mayors which is co-chaired by Mayor Sadiq Khan of London, United Kingdom, and Mayor Yvonne Aki-Sawyerr of Freetown, Sierra Leone. Three term Mayor of New York City Michael R. Bloomberg serves as President of the C40 Board of Directors, which is responsible for operational oversight. A nine-person management team, led by Executive Director, Mark Watts, leads the day-to-day management of C40. C40&rsquo;s three core strategic funders are Bloomberg Philanthropies, the Children&rsquo;s Investment Fund Foundation (CIFF) and Realdania.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>To learn more about the work of C40 and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.<br />\n&nbsp;</p>\n\n<p><strong>Global Covenant of Mayors for Climate &amp; Energy</strong></p>\n\n<p>The Global Covenant of Mayors for Climate &amp; Energy (GCOM) is the largest global alliance for city climate leadership, uniting a global coalition of over 13,000 cities and local governments and 100+ supporting partners to take ambitious and measurable climate and energy action. The cities and partners of GCOM share a long-term vision of supporting voluntary action to combat climate change and towards a resilient and low-emission society.&nbsp;</p>\n\n<p>In addition to providing resources and training opportunities, the GCOM gives cities a unified voice on the international stage, ensuring the local level is heard in global policy debates.</p>\n\n<p>The Global Covenant of Mayors is comprised of 13 Regional and National Covenants that support signatory cities in line with local needs. By signing up via their Regional or National Covenant, cities become part of a global movement.</p>\n\n<p>Hence, GCOM serves cities and local governments by mobilizing and supporting ambitious, measurable, planned climate and energy action in their communities by working with city/regional networks, national governments, and other partners to achieve our vision.&nbsp;</p>\n\n<p>Led today by UN Special Envoy on Climate Ambition and Solutions Michael R. Bloomberg and European Commission Executive Vice President Frans Timmermans, the coalition comprises cities across 6 continents and 142 countries, representing over 900 million people or more than 10% of the global population.<br />\nTo learn more about the work of GCOM and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>02. Summary, Purpose and Background of the Project</strong></p>\n\n<p>&nbsp;</p>\n\n<p>About the City Climate Finance Gap Fund:</p>\n\n<p>The City Climate Finance Gap Fund (Gap Fund) launched in September 2020, aims to help cities in developing and emerging countries transition towards low-carbon and climate-resilient pathways. This will be achieved by addressing the critical lack of financing necessary to formulate city climate strategies and analyze key actions, identifying the actions for cities to pursue to enhance their capacities, promoting improved coordination among key stakeholders, and supporting the preparation of projects from planning and strategy development to project concept and pre-feasibility stage.</p>\n\n<p>&nbsp;</p>\n\n<p>About the project:</p>\n\n<p>The project seeks to (i) raise awareness of cities and city networks about the Gap Fund,&nbsp; encompassing the development and dissemination of awareness raising materials, and the delivery of knowledge exchange events to facilitate partnerships and promote low-carbon, climate resilient city development activities; (ii) support cities through outreach activities that include the assessment of cities&rsquo; climate challenges and priorities, and the delivery of knowledge sharing activities, including training and workshops; and (iii) support overall coordination and project implementation.</p>\n\n<p>The project consists of three components, namely: (i) Awareness Raising, (ii) Support to Cities, and (iii) Project Management as described in the following sections.</p>\n\n<p>Component 1: Awareness Raising. This component will support selected cities by carrying out climate awareness activities. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Development and dissemination of awareness raising materials on the existence and operation of the Gap Fund in different regions; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge exchange events with relevant stakeholders to facilitate partnerships and promote low-carbon, climate-resilient city development activities.&nbsp;</p>\n\t</li>\n</ul>\n\n<p>Component 2: Support to Cities. This component will focus on outreach activities to promote low-carbon, climate-resilient city development. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Assessment of cities&rsquo; climate challenges and priorities in connection with developing, financing and implementing climate-smart projects; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge sharing activities, including trainings and workshops, with relevant stakeholders on existing tools and data available on emissions reduction, climate resilience and energy access quantification.</p>\n\t</li>\n</ul>\n\n<p>Component 3: Project Management. This component will support overall coordination and project implementation. The Global Secretariat at GCOM will function as the Project Implementation Unit (PIU) responsible for overall project monitoring and evaluation and reporting. The PIU will liaise with the World Bank and EIB Gap Fund Secretariats and work closely with GCOM&rsquo;s regional and national chapters. This component will also finance incremental operating costs.</p>\n\n<p>&nbsp;</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>Outputs/Work Assignment:</p>\n\n<ul>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the SSA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional local governments in Gap Fund training and events, collaborating with the Gap Fund - GCOM Global team and the Regional Covenant of Mayors in SSA.</p>\n\t</li>\n\t<li>\n\t<p>Provide support during the Gap Fund application process for SSA cities, identifying needs and challenges that can be addressed by Gap Fund technical assistance and reporting findings to the global team.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support to the GCOM-Gap Fund Global team&rsquo;s engagement in the SSA region, in coordination with the Regional Covenant.</p>\n\t</li>\n\t<li>\n\t<p>Conduct dialogues, meetings, interviews, and workshops with local government representatives and stakeholders in SSA cities to raise awareness of the Gap Fund and support the submission of quality Expressions of Interests.</p>\n\t</li>\n\t<li>\n\t<p>Translate relevant Gap Fund materials into Arabic and develop advocacy messages to encourage regional city applications.</p>\n\t</li>\n\t<li>\n\t<p>Facilitate and promote engagement between cities, partners, local governments, and stakeholders to increase awareness and promote low-carbon, climate- resilient city development activities.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to communication products, knowledge-sharing activities, and awareness-raising events, including writing articles, reports, and presentations.</p>\n\t</li>\n\t<li>\n\t<p>Participate in outreach and knowledge exchange activities, supporting the communications team.</p>\n\t</li>\n\t<li>\n\t<p>Overall goal: Raise awareness of the Gap Fund among cities and city networks in the SSA region, improving coordination and implementing low-carbon and climate-resilient city development projects.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The goal is to ensure clear communication and engagement with stakeholders across different regions, languages, and contexts through high-quality, accurate and culturally-sensitive interpretation and translation.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>03. Request for Expression of Interest (REoI) Guidelines</strong></p>\n\n<p>&nbsp;</p>\n\n<p>This Request for Expression of Interest (REoI) represents the requirements for an open and competitive process. Expression of Interest will be accepted until 6:00 pm CET, 3 January 2025. Any expression of interest received after this date and time will not be accepted. All expressions of interest should include clear timetables, how they would work with C40, clear costs and detail on experience in this area.</p>\n\n<p>The expression of interest should give C40 evaluators all the information they need to assess your bid. Please clearly indicate where applicable:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>How your expression of interest is responsive to the Evaluation Criteria;</p>\n\t</li>\n\t<li>\n\t<p>The assumptions you are making about the project;&nbsp;&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Risks you have identified and appropriate mitigation measures;</p>\n\t</li>\n\t<li>\n\t<p>Information about your fee;</p>\n\t</li>\n\t<li>\n\t<p>Proposed timeline of implementation;</p>\n\t</li>\n\t<li>\n\t<p>Any additional support that you need to make the project a success, including any inputs you will need from third parties or C40 staff;</p>\n\t</li>\n\t<li>\n\t<p>Proposed working partnership with C40, including (as applicable) project governance and management, key personnel, key roles and responsibilities, and escalation procedure for issues.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>You must include adequate information about how your costs were calculated to enable evaluation of cost reasonableness.&nbsp;</p>\n\n<p>The expression of interest should clearly indicate the required input from C40 staff, the timeline of implementation, and any required background work or set-up. Furthermore, the submission should show how the respondent intends that the project governance and management should work. This should, as a minimum, cover the proposed working partnership with C40, key roles and responsibilities, reporting, change requests, escalation of issues, sign-off of work stages, and acceptance criteria.&nbsp;</p>\n\n<p>Respondents are also required to set out any risks and assumptions made in planning this work. Where risks are identified appropriate management and mitigation strategies should also be outlined. The expression of interest should include details on how a risk assessment would be completed and what that would include.</p>\n\n<p>If the individual consultant submitting an expression of interest must outsource or contract any work to meet the requirements contained herein, this must be clearly stated in the EoI. Additionally, all costs included in expression of interest must be all-inclusive to include any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p>All costs must be itemized to include an explanation of all fees and costs.</p>\n\n<p>Contract terms and conditions will be negotiated upon selection of the winning bidder for this REoI. All contractual terms and conditions will be subject to review by C40 legal department and will include scope, budget, schedule and other necessary items pertaining to the project.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Supplier Diversity</strong></p>\n\n<p>C40 is committed to supplier diversity and inclusive procurement through promoting equity, diversity and inclusivity in our supplier base. We believe that by procuring a diverse range of suppliers, we get a wider range of experiences and thoughts from suppliers and thus are best able to deliver to the whole range of our diverse cities and the contexts that they operate within.</p>\n\n<p>We strongly encourage suppliers (individuals) that are diverse in terms of age, nationality, gender identity, sexual orientation, physical or mental ability, ethnicity and perspective to put forward a EoI to work with us.</p>\n\n<p>Feel welcome to refer to C40&rsquo;s Equity, Diversity and Inclusion Statement as supplier diversity and inclusive procurement is one element of applying equity, diversity and inclusion to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contract&nbsp;</strong></p>\n\n<p>Please note this is a contract for professional services and not a grant opportunity. Individual consultants unable to accept contracts for professional services should not submit bids. This opportunity will be awarded in line with the World Bank &ndash; Contract for small assignment &ndash; Time based template which is meant for individual consultants.</p>\n\n<p>These terms and conditions are non-negotiable. Organisations unable to accept them as drafted should not submit bids in connection with this opportunity.</p>\n\n<p>If C40 are unable to execute a contract with the winning bidder of this competitive process, we reserve the right to award the contract to the second highest ranked bidder.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Subcontracting</strong></p>\n\n<p><br />\nIf the individual consultant submitting an expression of interest needs to subcontract any work to meet the requirements of the expression of interest, this must be clearly stated. All costs included in expression of interest must be all-inclusive of any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>04. Submission and Timeline</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Request for Expression of Interest Timeline:</p>\n\n<p>&nbsp;</p>\n\n<table>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>REoI Timeline</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>Expected&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Request for EoI sent out</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>10 December 2024&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Deadline for receiving EoI</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Evaluation of EoI received</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>6 - 17 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Short list of individual Consultants: Interviews and assessments</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>20 - 24 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Selection decision made</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Draft Negotiated Contract</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 - 31 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Notification of Award</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 February 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>05. Scope, Objectives and Selection Criteria&nbsp;</strong></p>\n\n<p>Level: Specialist</p>\n\n<p>Title: Technical Support (City Advisor)</p>\n\n<p>Geographical Scope: Sub Saharan Africa (SSA)</p>\n\n<p>Location: Preferable within the SSA region</p>\n\n<p>Expected start date: February 2025</p>\n\n<p>Duration: Fixed term until December 31, 2025</p>\n\n<p>Objectives of the assignment:<br />\nC40 and the Global Covenant of Mayors (GCoM) are partnering with the City Climate Finance Gap Fund (Gap Fund) to raise awareness on the Gap Fund and support cities in accessing this technical assistance. Specifically in the Sub-Saharan Africa (SSA) region, the objectives of this assignment are:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitate engagement between cities and stakeholders to promote low-carbon and climate-resilient city development in the SSA region.</p>\n\t</li>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the SSA region.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support for the GCOM-Gap Fund partnership activities and engagement in the SSA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional and local governments and relevant partners and stakeholders in activities to raise awareness about the Gap Fund.</p>\n\t</li>\n\t<li>\n\t<p>Deliver workshops and outreach events for cities aiming to accelerate low-carbon development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Provide technical assistance for SSA cities aiming to apply to the Gap Fund and identify and address city challenges during the Expressions of Interest (EoI) completion process.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Contribute to develop communication products and support knowledge-sharing activities.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Scope of Services, Tasks (Components) and Expected Deliverables<br />\n&nbsp;</p>\n\n<p>1. Mapping and engagement of key stakeholders in the SSA region, including developing a database of relevant cities, local governments, partners and organizations in SSA involved in climate resilience and mitigation efforts.</p>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Stakeholder database</p>\n\t</li>\n\t<li>\n\t<p>Monthly reports on outreach and awareness-raising activities</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>2. Awareness raising and engagement:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitation of Gap Fund awareness-raising events for local governments.</p>\n\t</li>\n\t<li>\n\t<p>Engage with cities and provide support to facilitate low-carbon and climate-resilient development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Support the organization and delivery of information sessions, meetings and workshops.</p>\n\t</li>\n</ul>\n\n<p><br />\nDeliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Meeting/workshop reports</p>\n\t</li>\n\t<li>\n\t<p>Gap Fund training materials</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>3. Implementation support:</p>\n\n<ul>\n\t<li>\n\t<p>Liaise with project partners like Regional Covenant, cities and other stakeholders.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to reports and knowledge products on project progress, challenges and recommendations.</p>\n\t</li>\n</ul>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Progress reports</p>\n\t</li>\n\t<li>\n\t<p>Presentations</p>\n\t</li>\n\t<li>\n\t<p>Contribution to Knowledge Products publications</p>\n\t</li>\n\t<li>\n\t<p>Draft communication pieces showcasing progress in the region</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Reporting Requirements and Time Schedule for Deliverables</p>\n\n<p>(a) Narrative report, including progress on activities and deliverables, to be shared on a monthly basis and to be attached to the monthly invoices submitted;</p>\n\n<p>(b) The report and invoice will need to be submitted via an online form that will be provided to the selected consultant;</p>\n\n<p>(c) Submission deadline: on the 10th day of the following months, for each month of service;</p>\n\n<p>(d) Submission to the following email addresses:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance, tsantapaola@globalcovenantofmayors.org</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer, ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p><br />\nQualification Requirements for the Consultant:&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Master&rsquo;s degree(s) in urban studies and planning, economics, environment, climate change, engineering, finance, or other relevant discipline, plus at least 5 years of relevant work experience.</p>\n\t</li>\n\t<li>\n\t<p>Good understanding of sustainable development, urban economics, and climate change issues.</p>\n\t</li>\n\t<li>\n\t<p>Understand project and cities&rsquo; priorities and respond to their needs</p>\n\t</li>\n\t<li>\n\t<p>Adds value by constantly looking for better ways to get more impactful results</p>\n\t</li>\n\t<li>\n\t<p>Good organization and planning skills, a proven eye for detail, and an ability to work with diverse colleagues</p>\n\t</li>\n\t<li>\n\t<p>Written and spoken fluency in English is essential. Written and spoken fluency in French and/or another of the main region&rsquo;s languages is an advantage.</p>\n\t</li>\n\t<li>\n\t<p>Strong problem-solving and analytical skills and ability to prioritise interventions</p>\n\t</li>\n\t<li>\n\t<p>Excellent workflow, project management and task organisation skills</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>06. Additional Information</strong></p>\n\n<p>The potential post-holder is asked to submit an EoI including CV and Cover Letter. Please include your estimated daily fee.</p>\n\n<p>The total expected number of days for this role is between 120 and 160 days for the duration of the contract but this might be subject to change.&nbsp;</p>\n\n<p>It is preferable that the consultant is located within the SSA region. Experience working in Morocco is an advantage.&nbsp;</p>\n\n<p>This position might require travelling and related travel expenses will be covered by the project upon approval.&nbsp;</p>\n\n<p>All costs incurred in connection with the submission of this EoI are non-refundable by C40.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>07. C40 Policies&nbsp;</strong></p>\n\n<p>C40 expects third parties to able to abide by these C40 policies:</p>\n\n<ul>\n\t<li>\n\t<p>Non-Staff Code of Conduct Policy here</p>\n\t</li>\n\t<li>\n\t<p>Equity , Diversity and Inclusion Policy here</p>\n\t</li>\n\t<li>\n\t<p>Non-Staff Travel and Expenses Policy - here</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>08. &nbsp; &nbsp; Submissions&nbsp;</strong></p>\n\n<p>Each Potential Supplier must submit CV, Cover Letter, and estimated daily fee to the email addresses below by January 3, 2025 before 6:00 pm CET:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance (GCoM),&nbsp; tsantapaola@globalcovenantofmayors.org&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer (GCoM), ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p>The subject of the email should read as follows: Regional Technical Support for Sub Saharan Africa Region&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>09. Client&rsquo;s Input and Counterpart Personnel</strong></p>\n\n<p>&nbsp;</p>\n\n<p>(a) Services, facilities and property to be made available to the Consultant by the Client: email address, internal communication tools, Google Drive tools.</p>\n\n<p>(b) Professional and support counterpart personnel to be assigned by the Client to the Consultant&rsquo;s team: SSA team composed by 2 consultants, including this new consultancy role.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Disclaimer</strong></p>\n\n<p>C40 will not accept any liability or be responsible for any costs incurred by Potential Suppliers&nbsp; in preparing a response for this REoI.<br />\n<br />\nNeither the issue of the REoI, nor any of the information presented in it, should be regarded as a commitment or representation on the part of C40 (or any of its partners) to enter into a contractual arrangement. Nothing in this REoI should be interpreted as a commitment by C40 to award a contract to a Potential Supplier as a result of this procurement, nor to accept the lowest price or any tender.<br />\n&nbsp;</p>"},{"id":"OP00329071","notice_type":"Request for Expression of Interest","noticedate":"17-Dec-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-01-03T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"World","project_id":"P175329","project_name":"Gap Fund Partnership with GCOM","bid_reference_no":"C-1.13, C-2.13","bid_description":"Technical Support (Specialist) EECA countries","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Boulevard Charlemagne 1, Mezzanine Floor, 1041, Brussels, Belgium","contact_ctry_name":"Belgium","contact_email":"tsantapaola@globalcovenantofmayors.org","contact_name":"Tommaso Santapaola","contact_organization":"Global Covenant of Mayors for Climate and Energy","contact_phone_no":"+32 474 79 34 11","contact_web_url":"https://www.globalcovenantofmayors.org/","submission_date":"2024-12-17T00:00:00Z","notice_text":"<p><br />\n</p>\n\n<p>REQUEST FOR EXPRESSION OF INTEREST (REoI)</p>\n\n<p>&nbsp;</p>\n\n<p>Gap Fund - GCOM partnership</p>\n\n<p>&nbsp;</p>\n\n<p>Engagement support for Eastern Europe and Central Asia countries</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>C40 Cities Climate Leadership Group, Inc.</p>\n\n<p>120 Park Avenue, 23rd Floor</p>\n\n<p>New York, NY 10017</p>\n\n<p>United States of America</p>\n\n<p>&nbsp;</p>\n\n<p>Global Covenant of Mayors for Climate &amp; Energy</p>\n\n<p>Boulevard Charlemagne 1 &ndash; Mezzanine Floor</p>\n\n<p>1000 Brussels</p>\n\n<p>Belgium</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>10 December 2024</p>\n\n<p><strong>C40 Cities Climate Leadership Group Inc. (&ldquo;C40&rdquo;)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>C40 is a network of nearly 100 mayors of the world&rsquo;s leading cities, who are working to deliver the urgent action needed right now to confront the Sub Saharan Africa climate crisis, and create a future where everyone, everywhere can thrive. Mayors of C40 cities are committed to using a science-based and people-focused approach to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities. Through a Global Green New Deal, mayors are working alongside a broad coalition of representatives from labour, business, the youth climate movement and civil society to go further and faster than ever before.&nbsp;</p>\n\n<p>The strategic direction of the organisation is determined by an elected Steering Committee of C40 mayors which is co-chaired by Mayor Sadiq Khan of London, United Kingdom, and Mayor Yvonne Aki-Sawyerr of Freetown, Sierra Leone. Three term Mayor of New York City Michael R. Bloomberg serves as President of the C40 Board of Directors, which is responsible for operational oversight. A nine-person management team, led by Executive Director, Mark Watts, leads the day-to-day management of C40. C40&rsquo;s three core strategic funders are Bloomberg Philanthropies, the Children&rsquo;s Investment Fund Foundation (CIFF) and Realdania.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>To learn more about the work of C40 and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.<br />\n&nbsp;</p>\n\n<p><strong>Global Covenant of Mayors for Climate &amp; Energy</strong></p>\n\n<p>The Global Covenant of Mayors for Climate &amp; Energy (GCOM) is the largest global alliance for city climate leadership, uniting a global coalition of over 13,000 cities and local governments and 100+ supporting partners to take ambitious and measurable climate and energy action. The cities and partners of GCOM share a long-term vision of supporting voluntary action to combat climate change and towards a resilient and low-emission society.&nbsp;</p>\n\n<p>In addition to providing resources and training opportunities, the GCOM gives cities a unified voice on the international stage, ensuring the local level is heard in global policy debates.</p>\n\n<p>The Global Covenant of Mayors for Climate and Energy is comprised of 13 Regional and National Covenants that support signatory cities in line with local needs. By signing up via their Regional or National Covenant, cities become part of a global movement.</p>\n\n<p>Hence, GCOM serves cities and local governments by mobilizing and supporting ambitious, measurable, planned climate and energy action in their communities by working with city/regional networks, national governments, and other partners to achieve our vision.&nbsp;</p>\n\n<p>Led today by UN Special Envoy on Climate Ambition and Solutions Michael R. Bloomberg and European Commission Executive Vice President Frans Timmermans, the coalition comprises cities across 6 continents and 142 countries, representing over 900 million people or more than 10% of the global population.<br />\nTo learn more about the work of GCOM and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>02. Summary, Purpose and Background of the Project</strong></p>\n\n<p>&nbsp;</p>\n\n<p>About the City Climate Finance Gap Fund:</p>\n\n<p>The City Climate Finance Gap Fund (Gap Fund) launched in September 2020, aims to help cities in developing and emerging countries transition towards low-carbon and climate-resilient pathways. This will be achieved by addressing the critical lack of financing necessary to formulate city climate strategies and analyze key actions, identifying the actions for cities to pursue to enhance their capacities, promoting improved coordination among key stakeholders, and supporting the preparation of projects from planning and strategy development to project concept and pre-feasibility stage.</p>\n\n<p>&nbsp;</p>\n\n<p>About the project:</p>\n\n<p>C40 and the Global Covenant of Mayors (GCoM) are partnering with the City Climate Finance Gap Fund (Gap Fund) to raise awareness on the Gap Fund and support cities in accessing this technical assistance. This partnership seeks to (i) raise awareness of cities and city networks about the Gap Fund, encompassing the development and dissemination of awareness raising materials, and the delivery of knowledge exchange events to facilitate partnerships and promote low-carbon, climate resilient city development activities; (ii) support cities through outreach activities that include the assessment of cities&rsquo; climate challenges and priorities, and the delivery of knowledge sharing activities, including training and workshops; and (iii) support overall coordination and project implementation.</p>\n\n<p>The project consists of three components, namely: (i) Awareness Raising, (ii) Support to Cities, and (iii) Project Management as described in the following sections.</p>\n\n<p>Component 1: Awareness Raising. This component will support selected cities by carrying out climate awareness activities. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Development and dissemination of awareness raising materials on the existence and operation of the Gap Fund in different regions; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge exchange events with relevant stakeholders to facilitate partnerships and promote low-carbon, climate-resilient city development activities.&nbsp;</p>\n\t</li>\n</ul>\n\n<p>Component 2: Support to Cities. This component will focus on outreach activities to promote low-carbon, climate-resilient city development. It will comprise two activities:</p>\n\n<ul>\n\t<li>\n\t<p>Assessment of cities&rsquo; climate challenges and priorities in connection with developing, financing and implementing climate-smart projects; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge sharing activities, including training and workshops, with relevant stakeholders on existing tools and data available on emissions reduction, climate resilience and energy access quantification.</p>\n\t</li>\n</ul>\n\n<p>Component 3: Project Management. This component will support overall coordination and project implementation. The Global Secretariat at GCoM will function as the Project Implementation Unit (PIU) responsible for overall project monitoring and evaluation and reporting. The PIU will liaise with the World Bank and EIB Gap Fund Secretariats and work closely with GCOM&rsquo;s regional and national chapters. This component will also finance incremental operating costs.</p>\n\n<p>&nbsp;</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>Outputs/Work Assignment:</p>\n\n<ul>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the Central Asia region and Russian speaking countries in the Eastern Europe region (EECA).</p>\n\t</li>\n\t<li>\n\t<p>Engage regional local governments in Gap Fund trainings and events, collaborating with the Gap Fund - GCOM Global team and the Regional Covenant of Mayors working in Eastern Europe and Central Asia countries. .</p>\n\t</li>\n\t<li>\n\t<p>Provide support during the Gap Fund application process for Central Asia and other Russian speaking cities in the EECA region, identifying needs and challenges that can be addressed by Gap Fund technical assistance and reporting findings to the global team.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support to the GCOM-Gap Fund Global team&rsquo;s engagement in the EECA region, in coordination with the Regional Covenants.</p>\n\t</li>\n\t<li>\n\t<p>Conduct dialogues, meetings, interviews, and workshops with local government representatives and stakeholders in EECA cities, specifically in Central Asia,&nbsp; to raise awareness of the Gap Fund and support the submission of quality Expressions of Interests.</p>\n\t</li>\n\t<li>\n\t<p>Translate relevant Gap Fund materials into Russian and develop advocacy messages to encourage regional city applications.</p>\n\t</li>\n\t<li>\n\t<p>Facilitate and promote engagement between cities, partners, local governments, and stakeholders to increase awareness and promote low-carbon, climate- resilient city development activities.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to communication products, knowledge-sharing activities, and awareness-raising events, including writing articles, reports, and presentations.</p>\n\t</li>\n\t<li>\n\t<p>Participate in outreach and knowledge exchange activities, supporting the communications team.</p>\n\t</li>\n\t<li>\n\t<p>Overall goal: Raise awareness of the Gap Fund among cities and city networks in the Central Asia region, improving coordination and implementing low-carbon and climate-resilient city development projects.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The goal is to ensure clear communication and engagement with stakeholders across different regions, languages, and contexts through high-quality, accurate and culturally-sensitive interpretation and translation.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p><strong>03. Request for Expression of Interest (REoI) Guidelines</strong></p>\n\n<p>This Request for Expression of Interest (REoI) represents the requirements for an open and competitive process. Expression of Interest will be accepted until 6:00 pm CET, 3 January 2025. Any expression of interest received after this date and time will not be accepted. All expressions of interest should include clear timetables, how they would work with C40, clear costs and detail on experience in this area.</p>\n\n<p>The expression of interest should give C40 evaluators all the information they need to assess your bid. Please clearly indicate where applicable:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>How your expression of interest is responsive to the Evaluation Criteria;</p>\n\t</li>\n\t<li>\n\t<p>The assumptions you are making about the project;&nbsp;&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Risks you have identified and appropriate mitigation measures;</p>\n\t</li>\n\t<li>\n\t<p>Information about your fee;</p>\n\t</li>\n\t<li>\n\t<p>Proposed timeline of implementation;</p>\n\t</li>\n\t<li>\n\t<p>Any additional support that you need to make the project a success, including any inputs you will need from third parties or C40 staff;</p>\n\t</li>\n\t<li>\n\t<p>Proposed working partnership with C40, including (as applicable) project governance and management, key personnel, key roles and responsibilities, and escalation procedure for issues.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>You must include adequate information about how your costs were calculated to enable evaluation of cost reasonableness.&nbsp;</p>\n\n<p>The expression of interest should clearly indicate the required input from C40 staff, the timeline of implementation, and any required background work or set- up. Furthermore, the submission should show how the respondent intends that the project governance and management should work. This should, as a minimum, cover the proposed working partnership with C40, key roles and responsibilities, reporting, change requests, escalation of issues, sign-off of work stages, and acceptance criteria.&nbsp;</p>\n\n<p>Respondents are also required to set out any risks and assumptions made in planning this work. Where risks are identified appropriate management and mitigation strategies should also be outlined. The expression of interest should include details on how a risk assessment would be completed and what that would include.</p>\n\n<p>If the individual consultant submitting an expression of interest must outsource or contract any work to meet the requirements contained herein, this must be clearly stated in the EoI. Additionally, all costs included in expression of interest must be all-inclusive to include any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p>All costs must be itemized to include an explanation of all fees and costs.</p>\n\n<p>Contract terms and conditions will be negotiated upon selection of the winning bidder for this REoI. All contractual terms and conditions will be subject to review by C40 legal department and will include scope, budget, schedule and other necessary items pertaining to the project.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Supplier Diversity</strong></p>\n\n<p>C40 is committed to supplier diversity and inclusive procurement through promoting equity, diversity and inclusivity in our supplier base. We believe that by procuring a diverse range of suppliers, we get a wider range of experiences and thoughts from suppliers and thus are best able to deliver to the whole range of our diverse cities and the contexts that they operate within.</p>\n\n<p>We strongly encourage suppliers (individuals) that are diverse in terms of age, nationality, gender identity, sexual orientation, physical or mental ability, ethnicity and perspective to put forward an EoI to work with us.</p>\n\n<p>Feel welcome to refer to C40&rsquo;s Equity, Diversity and Inclusion Statement as supplier diversity and inclusive procurement is one element of applying equity, diversity and inclusion to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contract</strong>&nbsp;</p>\n\n<p>Please note this is a contract for professional services and not a grant opportunity. Individual consultants unable to accept contracts for professional services should not submit bids. This opportunity will be awarded in line with the World Bank &ndash; Contract for small assignment &ndash; Time based template which is meant for individual consultants.</p>\n\n<p>These terms and conditions are non-negotiable. Organisations unable to accept them as drafted should not submit bids in connection with this opportunity.</p>\n\n<p>If C40 are unable to execute a contract with the winning bidder of this competitive process, we reserve the right to award the contract to the second highest ranked bidder.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Subcontracting</strong><br />\n<br />\nIf the individual consultant submitting an expression of interest needs to subcontract any work to meet the requirements of the expression of interest, this must be clearly stated. All costs included in expression of interest must be all-inclusive of any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p><br />\n&nbsp;</p>\n\n<p><strong>04. Submission and Timeline</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Request for Expression of Interest Timeline:</p>\n\n<table>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>REoI Timeline</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>Expected&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Request for EoI sent out</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>10 December 2024&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Deadline for receiving EoI</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Evaluation of EoI received</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>6 - 17 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Short list of individual Consultants: Interviews and assessments</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>20 - 24 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Selection decision made</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Draft Negotiated Contract</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>27 - 31 January 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Notification of Award</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>3 February 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>05. Scope, Objectives and Selection Criteria&nbsp;</strong></p>\n\n<p>Level: Specialist&nbsp;</p>\n\n<p>Title: Engagement Support</p>\n\n<p>Geographical Scope: Eastern European and Central Asian countries</p>\n\n<p>Location: Preferable within the EECA region</p>\n\n<p>Expected start date: February 2025</p>\n\n<p>Duration: Fixed term until December 31, 2025</p>\n\n<p>&nbsp;</p>\n\n<p>Objectives of the assignment</p>\n\n<p><br />\nThe GCoM-Gap fund Partnership spreads across four regions. Under the guidance of the Global team and closely working with the team for the EECA (Eastern Europe and Central Asia) region, the objectives of this assignment are:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitate engagement between cities and stakeholders to promote low-carbon and climate-resilient city development in the EECA region.</p>\n\t</li>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the EECA region.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support for the GCoM-Gap Fund partnership activities and engagement in the EECA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional and local governments and relevant partners and stakeholders in activities to raise awareness about the Gap Fund.</p>\n\t</li>\n\t<li>\n\t<p>Support the delivery of workshops and outreach events for cities aiming to accelerate low-carbon development.</p>\n\t</li>\n\t<li>\n\t<p>Together with other members of the EECA team, provide technical assistance for cities aiming to apply to the Gap Fund in the region, and identify and address city challenges during the Expression of Interest (EoI) completion process.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to develop communication products and support knowledge-sharing activities.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Scope of Services, Tasks (Components) and Expected Deliverables</p>\n\n<p>&nbsp;</p>\n\n<p>1. Mapping of key stakeholders in the EECA region, including developing a database of relevant cities, local governments, partners and organizations in EECA involved in climate resilience and mitigation efforts.</p>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Stakeholder database</p>\n\t</li>\n\t<li>\n\t<p>Monthly reports on outreach and awareness-raising activities</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>2. Awareness raising and engagement:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitation of Gap Fund awareness-raising events for local governments.</p>\n\t</li>\n\t<li>\n\t<p>Engage with cities and provide support to facilitate low-carbon and climate-resilient development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Support the organization and delivery of information sessions, meetings and workshops.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Meeting/workshop reports</p>\n\t</li>\n\t<li>\n\t<p>Gap Fund training materials regionally adapted&nbsp;</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>3. Implementation support:</p>\n\n<ul>\n\t<li>\n\t<p>Support the EECA regional team and, under the supervision of the Global team, coordinate with other regional teams</p>\n\t</li>\n\t<li>\n\t<p>Liaise with project partners like Regional Covenant, cities and other stakeholders.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to reports and knowledge products on project progress, challenges and recommendations.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Progress reports</p>\n\t</li>\n\t<li>\n\t<p>Presentations</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Reporting Requirements and Time Schedule for Deliverables</p>\n\n<p>(a) Narrative report, including progress on activities and deliverables, to be shared on a monthly basis and to be attached to the monthly invoices submitted;</p>\n\n<p>(b) The report and invoice will need to be submitted via an online form that will be provided to the selected consultant;</p>\n\n<p>(c) Submission deadline: on the 10th day of the following months, for each month of service;</p>\n\n<p>(d) Submission to the following email addresses:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance, tsantapaola@globalcovenantofmayors.org</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer, ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Qualification Requirements for the Consultant</p>\n\n<ul>\n\t<li>\n\t<p>Graduate degree in relevant fields like urban planning, economics, environment, and engineering.</p>\n\t</li>\n\t<li>\n\t<p>3+ years experience in areas like sustainable development and climate change.</p>\n\t</li>\n\t<li>\n\t<p>Strong project management, analytical, communication and presentation skills.</p>\n\t</li>\n\t<li>\n\t<p>Fluency in written and spoken English and Russian is required. Any additional language spoken in the region would be an asset.</p>\n\t</li>\n\t<li>\n\t<p>Experience working in multicultural environments.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>06. Additional Information</strong></p>\n\n<p>The potential post-holder is asked to submit an EoI including CV and Cover Letter. Please include your estimated daily fee.</p>\n\n<p>The total expected number of days for this role is between 40 to 60 for the duration of the contract but this might be subject to change.&nbsp;</p>\n\n<p>This position might require travelling and related travel expenses will be covered by the project upon approval.&nbsp;</p>\n\n<p>All costs incurred in connection with the submission of this EoI are non-refundable by C40.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>07. C40 Policies&nbsp;</strong></p>\n\n<p>C40 expects third parties to able to abide by these C40 policies:</p>\n\n<ul>\n\t<li>\n\t<p>Non-Staff Code of Conduct Policy here</p>\n\t</li>\n\t<li>\n\t<p>Equity , Diversity and Inclusion Policy here</p>\n\t</li>\n\t<li>\n\t<p>Non-Staff Travel and Expenses Policy - here</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>08. &nbsp; &nbsp; Submissions&nbsp;</strong></p>\n\n<p>Each Potential Supplier must submit CV, Cover Letter, and estimated daily fee to the email addresses below by 3 January 2025 before 6:00 pm CET:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance (GCoM),&nbsp; tsantapaola@globalcovenantofmayors.org&nbsp;&nbsp;&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Ceire Carey, Operations Officer (GCoM), ccarey@globalcovenantofmayors.org&nbsp;&nbsp;</p>\n\t</li>\n</ol>\n\n<p>The subject of the email should read as follows: Engagement Support for Eastern European and Central Asian countries - GCOM-GAP FUND</p>\n\n<p>&nbsp;</p>\n\n<p><strong>09. Client&rsquo;s Input and Counterpart Personnel</strong></p>\n\n<p>(a) Services, facilities and property to be made available to the Consultant by the Client: email address, internal communication tools, Google Drive tools.</p>\n\n<p>(b) Professional and support counterpart personnel to be assigned by the Client to the Consultant&rsquo;s team: EECA team composed by 3 consultants, including this new consultancy role.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Disclaimer</strong></p>\n\n<p>C40 will not accept any liability or be responsible for any costs incurred by Potential Suppliers&nbsp; in preparing a response for this REoI.<br />\n<br />\nNeither the issue of the REoI, nor any of the information presented in it, should be regarded as a commitment or representation on the part of C40 (or any of its partners) to enter into a contractual arrangement. Nothing in this REoI should be interpreted as a commitment by C40 to award a contract to a Potential Supplier as a result of this procurement, nor to accept the lowest price or any tender.<br />\n&nbsp;</p>"},{"id":"OP00305569","notice_type":"Request for Expression of Interest","noticedate":"15-Aug-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-09-05T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P168180","project_name":"Institutional Capacity Building Project","bid_reference_no":"SAMA-IPO-5SOE-QCBS","bid_description":"Engagement of a Consulting Company for the Implementation of Privatization Operations for the five largest SOEs","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"29., Istiklol street, 100017 Tashkent","contact_ctry_name":"Uzbekistan","contact_email":"jasur.karshibayev@imv.uz","contact_name":"Jasur Karshibaev","contact_organization":"Ministry of Economy and Finance of the Republic of Uzbekistan","contact_phone_no":"+998903311662","contact_web_url":"info@imv.uz","submission_date":"2024-08-15T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST<br />\n(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Uzbekistan </strong></p>\n\n<p><strong>Institutional Capacity Building Project </strong></p>\n\n<p>Credit No.: IDA 6431-UZ</p>\n\n<p><strong>Assignment Title:</strong><strong> Engagement of a Consulting Company for the Implementation of Privatization Operations for the five largest SOEs</strong></p>\n\n<p><strong>Reference No</strong>.: <strong>SAMA-IPO-5SOE-QCBS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Ministry of Economy and finance of the Republic of Uzbekistan has received financing from the World Bank toward the cost of the Institutional Capacity Building Project and intends to apply part of the proceeds for consulting services on behalf of the State Assets Management Agency (UzSAMA).</p>\n\n<p>The UzSAMA is seeking to engage a qualified and experienced Advisor to assist in the privatization of five State-Owned Enterprises (SOEs) in three key economic sectors: services, chemical (fertilisers), and construction.</p>\n\n<p>The objective of this task is to provide comprehensive full-cycle support to UzSAMA in privatizing at least five SOEs in three key sectors in line with international good practice, considering the industry and individual specifics of assets, and applicable national legislation.</p>\n\n<p>The Ministry of Economy and finance of the Republic of Uzbekistan now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services submitting directly to the piu_mof@mail.ru.</p>\n\n<p>The qualification requirements for the Consultants are:</p>\n\n<ul>\n\t<li>Advisor&#39;s experience with transactions involving SOEs in the mentioned sector in developing country context, including in CIS countries;</li>\n\t<li>A demonstrable track record of successfully completed privatization projects, with at least 5 similar projects conducted within 10 years period;</li>\n\t<li>In-depth knowledge and expertise in the specific sectors related to the assets being privatized, including regulatory environments, market dynamics, and operational challenges;</li>\n\t<li>Proficiency in financial analysis, valuation, legal frameworks, and transaction structuring related to privatization;</li>\n\t<li>Information about the team involved in the proposed Transaction, specifying the names of individuals and information about them: work experience, general transaction experience and specific transaction experience;</li>\n\t<li>Sufficient competence as well as human, time, and material resources to carry out the assigned tasks;</li>\n\t<li>Relevant experience in consultations on pre-sale preparation of assets.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The proposed team will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference. The Key experts will be not evaluation during review the EOI.</p>\n\n<p>The attention of interested Consultants is drawn to Section III of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised in November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Ministry of Finance of the Republic of Uzbekistan.</p>\n\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours from 9:00 a.m. to 18:00 p.m. Tashkent time.</p>\n\n<p>Expressions of interest must be delivered in a written form in English, Russian or Uzbek languages to the address below (in person, or by mail, or by e-mail) by September 5 2024.</p>\n\n<p>&nbsp;</p>\n\n<p>Project Implementation Unit under the<br />\nMinistry of Economy and finance of the Republic of Uzbekistan</p>\n\n<p>Attn: Sirojiddin Imanov, Manager of the Project</p>\n\n<p>Uzbekistan, 100017, Tashkent city, 29, Istiklol St.</p>\n\n<p>Tel: +998901741711</p>\n\n<p>E-mail: <em>piu_mof@mail.ru</em></p>\n\n<p>&nbsp;</p>\n\n<p><em>As part of the EOI, the consultant should include the following information:</em></p>\n\n<ul>\n\t<li>Consulting Firm Information</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:490.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Country of Incorporation:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Acronym:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>EOI Submission Authorized by:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Associations (Joint Venture or Sub-consultancy)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:476.6pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.5pt; width:76.0pt\">\n\t\t\t<p>Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:59.95pt\">\n\t\t\t<p>Acronym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:88.65pt\">\n\t\t\t<p>Country of Incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:76.5pt\">\n\t\t\t<p>Joint Venture (JV) or Sub-consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>EOI Submission Authorized By</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:85.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Present the rationale for and benefits of working in association (JV or Sub-consultant) with others rather than undertaking the assignment independently (as appropriate). Describe the proposed management and coordination approach of the association and the role of each firm</em>.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Technical competence </strong></li>\n</ul>\n\n<p><em>Project References - highlight the technical qualifications of your entity/consortium in undertaking similar assignments. Provide details of past experiences working with similar project authorities</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Geographical experience </strong></li>\n</ul>\n\n<p>Project References, present experiences in similar geographic areas.</p>\n\n<ul>\n\t<li><strong>Management Competence </strong></li>\n</ul>\n\n<ul>\n\t<li>Describe standard policies, procedures, and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.</li>\n\t<li>How your firm/consortium handles complaints concerning the performance of experts or quality of the reports submitted for previous and future assignments? What internal controls are in place to address and resolve complaints.</li>\n\t<li>How you ensure the quality of your firm&rsquo;s/consortium&rsquo;s performance over the life of assignments.</li>\n</ul>\n\n<ul>\n\t<li><strong>Projects references </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:484.15pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:30.05pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:74.15pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:3.0cm\">\n\t\t\t<p>Project start date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:71.9pt\">\n\t\t\t<p>Project end date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:50.6pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.65pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Summary for the Projects listed above</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Eligibility </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>We, the undersigned, certify to the best of our knowledge and belief:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We have read the advertisement, including the terms of reference (TOR), for this assignment (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the TOR for this activity (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We confirm that the project references submitted as part of this EOI accurately reflect the experience of the specified firm/consortium. (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Ensuing assignment resulting from our work product under this assignment, our firm, JV member or sub-consultant, and the expert(s) will be disqualified from short-listing and participation in the assignment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>The lead entity and JV member or sub-consultant are NOT currently sanctioned by or other MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Terms of Reference </strong></p>\n\n<p><strong>For a Advisor to support Implementation of Privatization Operations for the five State Owned Enterprises </strong></p>\n\n<ol>\n\t<li><strong>Introduction</strong></li>\n</ol>\n\n<p>In May of 2024 a new Law &ldquo;On privatization of state-property&rdquo; came into force, which determined 8 methods of privatization, such as electronic online auction, competitive bidding, stock exchange, public invitation to negotiate, competitive dialogue, contribution of real estate, share and enterprise to the charter fund of another company, as well as leasing of enterprise with the condition of subsequent sale. By this Law, the State Assets Management Agency (hereinafter as&nbsp;&ndash;&nbsp;UzSAMA) is an authorized state body in the sphere of privatization of state property and is in charge of developing privatization programs for each category of state property.</p>\n\n<p>Therefore, to implement privatization reforms, by ensuring competition in the economy, creating equal conditions for business entities, accelerating the full transition to market relations, increasing the competitiveness of the national economy, as well as increasing the volume of private investment, UzSAMA intends to attract, on the basis of a competitive procedure a Advisor to support the upcoming privatization of five SOEs in three key sectors of the economy such as: services, chemical (fertilizers) and construction. The&nbsp; selection process will follow the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised in November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;).The Ministry of Economy and Finance of the Republic of Uzbekistan (Client) has received financing from the World Bank toward the cost of the Institutional Capacity Building Project and intends to apply part of the proceeds for consulting services on behalf of the State Assets Management Agency (UzSAMA).</p>\n\n<p>Privatization of relevant state assets is aimed at achieving the following goals:</p>\n\n<ul>\n\t<li>developing competition in relevant sectors of Uzbekistan&#39;s economy and reducing state participation in them.</li>\n\t<li>increasing the efficiency of all factors of production, including material, human and financial resources.</li>\n\t<li>increasing the volume of private investment for the development of the economy.</li>\n</ul>\n\n<ol>\n\t<li>&nbsp;<strong>Sector Background</strong></li>\n</ol>\n\n<p>The UzSAMA is seeking to engage a qualified and experienced Advisor to assist in the privatization of five State-Owned Enterprises (SOEs) in three key economic sectors: services, chemical (fertilisers), and construction.</p>\n\n<p>The five SOEs for privatization are expected to be selected from the SOEs listed in Annex 1 to this Terms of Reference. The list was prepared based on the annexes 1 and 2 of the Resolution of the President No.162 dated 19 April 2024 and is subject to change in accordance with the privatization program of the government.</p>\n\n<p>Service sector: The service sector contributes significantly to Uzbekistan&#39;s GDP, accounting for around 35-40% of the total GDP. It has been a major driver of economic growth, especially as the country transitions from an agriculture-based economy to a more diversified one.</p>\n\n<p>Chemical (fertalisers) sector: Uzbekistan has a well-established chemical sector, particularly in the production of fertilizers. Since country&#39;s chemical industry is a significant contributor to its economy, primarily driven by its abundant natural gas resources, which serve as a key input for fertilizer production. The government of Uzbekistan has introduced new policies to attract foreign investment and promote private ownership in various sectors, including chemicals. Therefore, several state-owned chemical enterprises have been slated for privatization.</p>\n\n<p>Constuction sector: The Uzbek government has launched various initiatives to modernize the sector, including the adoption of new construction technologies and practices. There are also efforts to improve regulatory frameworks to ensure the quality and safety of construction projects. The sector presents numerous opportunities for foreign investors, particularly in areas such as residential and commercial real estate, industrial facilities, and infrastructure development.</p>\n\n<ol>\n\t<li><strong>Objective</strong></li>\n</ol>\n\n<p>The objective of this task is to provide comprehensive full-cycle support to UzSAMA in privatizing at least five SOEs in three key sectors in line with international good practice, considering the industry and individual specifics of assets, and applicable national legislation. As part of the process, UzSAMA may request an independent valuation company to carry out an independent asset valuation based on national rules.</p>\n\n<p><strong>Scope of services</strong></p>\n\n<ol>\n\t<li><strong>General</strong></li>\n</ol>\n\n<p>The UzSAMA intends to hire an Advisor&nbsp; to supoport the implementation of Privatization Deals through delivering advice on all aspects of the transaction, including inter alia:</p>\n\n<ul>\n\t<li>Privatization strategy.</li>\n\t<li>Transaction marketing.</li>\n\t<li>Commercial, financial, technical, legal, environmental and management due diligence.</li>\n\t<li>Preparation of sales documentation; and,</li>\n\t<li>Negotiation with potential investors and finalisation of the privatization contracts.</li>\n</ul>\n\n<p>The scope of services/work included in the Advisor&rsquo;s Terms of Reference is indicative, and the actual scope of work and details may differ to conclude the transaction efficiently and effectively within the agreed timetable. The Advisor is encouraged to propose any revisions to improve the tasks listed under these Terms of Reference, which will be taken into account during the technical evaluation of proposals.</p>\n\n<p>The detailed activities and timetable, which outline the key tasks, deadlines and deliverables would be set during the privatization process (after the Advisor would (i) become familiar with the SOEs (ii) refine its understanding of the Government&rsquo;s objectives and constraints, and (iii) review the completed reports relevant to the project and pending legislative changes) and included in the Diagnostic report.</p>\n\n<ol>\n\t<li><strong>The Assignment Overview</strong></li>\n</ol>\n\n<p>The Advisor is required to assist the UzSAMA with the intention of successful sale of SOEs (project companies) fulfilling the Government&rsquo;s stated objective (the Assignment&rdquo;). The phases envisaged for the assignment are:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:89.9pt\">\n\t\t\t<p>PHASES</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:188.05pt\">\n\t\t\t<p>TASKS</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>TIMELINE</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.5pt\">\n\t\t\t<p>DELIVERABLES</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"width:89.9pt\">\n\t\t\t<p>Preparation</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Privatization process planning&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>1 month</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"5\" style=\"width:130.5pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Due diligence report;</li>\n\t\t\t\t<li>Privatization and marketing strategy report.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Enterprise analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>3 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Market analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>2 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Review of legislation and regulation</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>2 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Comparable transactions analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>1 month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"3\" style=\"width:89.9pt\">\n\t\t\t<p>Transaction</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Selection</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>5 months</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"3\" style=\"width:130.5pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Information Memoranda.</li>\n\t\t\t\t<li>Transaction documentation described above.</li>\n\t\t\t</ul>\n\n\t\t\t<p>Report on competition issues (if required).&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Preparation of transaction documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>1 month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:188.05pt\">\n\t\t\t<p>Managing potential investors</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:62.0pt\">\n\t\t\t<p>1 month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.05pt; width:89.9pt\">\n\t\t\t<p>Completion</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.05pt; width:188.05pt\">\n\t\t\t<p>Negotiation and finalisation of Sales and Purchase Agreement (&ldquo;SPA&rdquo;)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.05pt; vertical-align:top; width:62.0pt\">\n\t\t\t<p>2 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.05pt; width:130.5pt\">\n\t\t\t<p>&bull; Offers evaluation report and recommendation for preferred bidders for each SOEs;</p>\n\n\t\t\t<p>&bull; Signed sale andhare purchase agreement for each of the SOEs; and</p>\n\n\t\t\t<p>&bull; Post privatization monitoring strategy.&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The Advisor is expected to complete the above tasks for all five SOEs within 24 months after signing a contract.</p>\n\n<p>Firms submitting proposals are, however, encouraged to propose their own timetables and suggest how, if at all, the assignment might be completed earlier. The Advisor should ensure that proposals allow adequate resources to achieve their proposed timetable.</p>\n\n<p>PREPARATION PHASE</p>\n\n<p>The preparation phase should not be regarded as a series of sequential and/or disconnected tasks. UzSaAMA requires that the Advisor adopts a fully integrated approach to its analysis and reporting and that all relevant issues are considered within the context of the Government&rsquo;s privatization objective.</p>\n\n<p>The UzSAMA expects the Advisor to develop a detailed plan for the preparation and conduct of the privatization transaction based on privatization program, approved by the Resolution of the President No.162 dated 19 April 2024. The plan should include:</p>\n\n<ol>\n\t<li>Detailed Privatization Strategy.</li>\n\t<li>Marketing strategy; and</li>\n\t<li>Project resource plan.</li>\n</ol>\n\n<p>The Advisor will be required to undertake necessary actions to become familiar with the details and to establish adequate local resources to conduct the privatization Project efficiently and effectively. This process will include:</p>\n\n<ul>\n\t<li>Meetings with key personnel in the SOEs, relevant ministries and regulators.</li>\n\t<li>Site visits where necessary; and,</li>\n\t<li>Review and evaluation of completed reports relevant to the Project.</li>\n</ul>\n\n<p>The Project resource plan should present logistical plans for managing the privatization process and identify areas where the Advisor is relying on particular inputs from the UzSAMA or relevant ministries. The resource plan should include the Advisor&rsquo;s team structure, contact details of key personnel, reporting lines and timing of inputs, proposals for the structure of a project steering committee, together with outline data requests and deadlines for receipt of information from relevant institutions.</p>\n\n<p>On completion of this familiarisation process and in light of all available information, the Advisor should prepare a diagnostic report updating and developing the contents of the Advisor&rsquo;s proposal. Additionally, the diagnostic report has to include an outline marketing strategy.</p>\n\n<ol>\n\t<li><strong>Privatization Strategy</strong></li>\n</ol>\n\n<p>The Advisor will be responsible for the preparation and presentation of all necessary documentation covering:</p>\n\n<ul>\n\t<li>The detailed proposal of the privatization method based on privatization programme.</li>\n\t<li>Publication of notices on the privatization process; and</li>\n\t<li>Information on the entities to be privatised as required by the privatization law.</li>\n</ul>\n\n<p>The Advisor will be required to assess the proposed method in the privatization program and composition of sale packages and to comment on it, including, if the Advisor deems necessary, a proposal to 1) modify the method and/or 2) to reallocate companies within the sale packages.</p>\n\n<p>The privatization Strategy should take the into account relevant public policy documents and explain how the recommended strategy will contribute towards the achievement of that overall development plan.</p>\n\n<p>The Privatization Strategy should also identify and propose alternative solutions to potential key problem issues that may arise during the course of the transactions.</p>\n\n<ol>\n\t<li><strong>Marketing Strategy</strong></li>\n</ol>\n\n<p>UzSAMA is expecting the Advisor to propose and implement a multi-faceted marketing strategy that presents the opportunity effectively and reaches a wide target audience. UzSAMA expects the Advisor to take full advantage of the potential of all communication channels to promote the transaction, including printed media and the internet. UzSAMA would expect to be fully informed about developing and executing the marketing effort.</p>\n\n<p><strong>I. Market Analysis:</strong></p>\n\n<p>The Advisor should prepare</p>\n\n<ul>\n\t<li>an analysis of the prevailing and forecast market conditions for the selected SOEs&rsquo; activities for the development of the industry in Uzbekistan and in the region, the necessary conditions for the development of enterprises of the industry.</li>\n\t<li>an analysis of the experience of privatization of the industry enterprises in other (including neighbouring) countries, the main reasons for the failure of privatization of this type of asset, the factors that ensure the success of privatization and further development of the industry.</li>\n</ul>\n\n<p><strong>II. Enterprise Analysis:</strong></p>\n\n<p>The Advisor will be required to undertake an extensive analysis of the current state of the SOEs.</p>\n\n<p>The main areas of analysis that should be undertaken are:</p>\n\n<ul>\n\t<li><strong>Financial</strong>; including a review of the financial statements (balance sheet, income statement and cash flow statement) of the SOEs, liabilities to state entities,</li>\n\t<li><strong>Commercial</strong> including a review of commercial and management practices, revenue cycles, cost structures, analysis of contracts with key suppliers and customers together with indications of potential areas for improvement.</li>\n\t<li><strong>Technical</strong> including appraisal of the technical capacities and condition of fixed assets.</li>\n\t<li><strong>Legal </strong>provide legal assessment of the SOEs contractual obligations and liabilities vis-a-vis third parties, ownership issues and legal right to sell, title to property and assets and major contracts and of the terms and conditions of licences already issued. The analysis should include conclusions on outstanding actions in connection with the licensing regime that may be required prior to privatization, intellectual property issues and other relevant legal issues.</li>\n\t<li><strong>Environmental and Social</strong> including a review of the environmental and social impact of the SOEs. The Advisor will be required to report on compliance with national environmental and social standards and prepare estimates of any remediation costs. Furthermore, the Advisor will evaluate and conclude on the liabilities associated with funding these costs, ensuring that all assessments align with the World Bank Safeguard Policies on environmental and social aspects in the context of privatization.</li>\n\t<li><strong>Management and Personnel</strong>, including obligations likely to arise from organisational rationalisation and/or reduction of personnel, overview of collective labour agreements, other labour and civil contracts and relevant employment legislation and associated regulation. The Advisor should benchmark current management and personnel structures and practices against best international practice</li>\n</ul>\n\n<p>description of the Asset, its market and competitive positioning.</p>\n\n<p>The Advisor will also identify potential areas of concern about the assets from an investor&#39;s perspective and the most common reasons for failures of such transactions. Providing recommendations for measures to mitigate the identified risks.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>III Comparable Transactions </strong></p>\n\n<p>The Advisor should also present a review of international comparable transactions, analysing the strengths and weaknesses of different privatization strategies and the eventual successes and failures of attempts to privatise the similar companies in other countries.</p>\n\n<p><strong>IV Legal and Regulatory</strong></p>\n\n<p>The Advisor should assess the legislative and regulatory environment to identify issues that, based on international experience, may arise during the course of and after the completion of the privatization of the SOES in services, chemical (fertilisers), and construction sectors.</p>\n\n<p><strong>Preparation Phase Deliverables </strong></p>\n\n<p>The deliverables from this phase of the assignment are:</p>\n\n<ol>\n\t<li>Due diligence report, covering all aspects of the Enterprise Analysis task and also sections on market analysis and legislative and regulatory review.</li>\n\t<li>Privatization and marketing strategy report, including sections covering privatization strategy, marketing strategy and analysis of the comparable transaction.</li>\n</ol>\n\n<p>All deliverables are subject to review and approval by the UzSAMA.</p>\n\n<p>Transaction Phase</p>\n\n<p>As soon as the preparatory phase is completed, UzSAMA, as well as the Advisor launch the process of collecting offers. This will be conducted in accordance with the final recommendations concerning form and timing for each SOEs as set out in the privatization strategy.</p>\n\n<p>Building on the results from the early marketing, one of the key aspects to the success of the transaction will be the effective management of relations with potential investors. UzSAMA expects its Advisor to provide all reasonable support and guidance to potential investors and to ensure that the transaction logistics are managed in accordance with best international practices.</p>\n\n<p>The Advisor will be responsible for handling initial enquiries from potential investors, co-ordinating the formal expressions of interest, and preparing and disseminating due diligence procedure instructions (within the instructions to bidders contained in the information memorandum).</p>\n\n<p>The Advisor will make data room documents available in electronic format (virtual data room). The Advisor will be responsible for setting up and running the virtual data room&nbsp; taking into account legal and regulatory requirements.</p>\n\n<p>The Advisor will also ensure that all necessary public notices are published in accordance with privatization law. In association with the privatization co-ordinator, the Advisor will also arrange meetings with UzSAMA personnel, site visits, and provide e-data room access.</p>\n\n<p>The Advisor will also be required to prepare a detailed Information Memorandum (&ldquo;IM&rdquo;) and Sales Process Documentation (&ldquo;SPD&rdquo;)</p>\n\n<p>The IMs should be prepared in accordance with Uzbekistan legal requirements and should contain inter alia:</p>\n\n<ul>\n\t<li>An introduction to the context of the transaction and description of the Government&rsquo;s objectives.</li>\n\t<li>Detailed evaluation of findings from the analysis undertaken in the preparation phase; and,</li>\n\t<li>Any other information required by privatization and other relevant laws.</li>\n</ul>\n\n<p>The SPDs should contain inter alia:</p>\n\n<ul>\n\t<li>Instructions to bidders on the conduct of due diligence and the transaction.</li>\n\t<li>The privatization timetable.</li>\n\t<li>Description of the basis of evaluation of offers.</li>\n\t<li>Confidentiality agreement/declaration for potential investors.</li>\n\t<li>Outline framework for expressions of interest and offers in compliance with the requirements of the privatization law.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Transaction Documentation</strong></p>\n\n<p>The Advisor will be expected to prepare all the documents connected to the successful conclusion of the transaction, including:</p>\n\n<ul>\n\t<li>Draft sale and purchase agreement (SPA).</li>\n\t<li>Other legal documents necessary that should be complete to comply with the privatization law.</li>\n</ul>\n\n<p>The Advisor will be expected to enter into a dialogue with pre-selected potential investors to ensure that the format and the contents of the contract are broadly acceptable prior to entering into final negotiations. The ultimate form and content will be agreed with the UzSAMA.</p>\n\n<p>The Advisor, with the assistance of the UzSAMA, should draft all necessary reports and other documentation for approval by the relevant Government body or agency.</p>\n\n<p><strong>Selection </strong></p>\n\n<p>Based on a review of international experience and taking into account the Government&rsquo;s objectives and the specific features of the Uzbekistan environment, the Advisor should prepare a detailed framework for the evaluation of offers and the selection of a preferred investor.</p>\n\n<p>The selection criteria should be based on an appropriate balance of key aspects of the technical and financial offer received from each potential investor. The Advisor will be required to prepare such a report if necessary and to present any evidence that the authorities may require.</p>\n\n<p><strong>Transaction Phase Deliverables </strong></p>\n\n<p>The principal deliverables from this phase, separately for each privatization deal are:</p>\n\n<ul>\n\t<li>Information Memoranda.</li>\n\t<li>Transaction documentation described above.</li>\n\t<li>Report on competition issues (if required).</li>\n</ul>\n\n<p>These deliverables may not be combined and are subject to review and approval by UzSAMA.</p>\n\n<p>COMPLEtion Phase</p>\n\n<p><strong>Evaluation of Offers </strong></p>\n\n<p>The Advisor will, conduct the opening of offers and ensure that offers comply with the technical requirements as set out in the instructions to bidders. The Advisor will then present a report to the UzSAMA setting out a detailed analysis of the offers and making a firm recommendation for short list and resubmission of improved offers or preferred bidder. In the event that the Advisor recommends a short list and call for improved offers, the Advisor will be responsible for agreeing the terms and conditions of the second or subsequent bidding rounds with the PA and communicating the requirements to the potential investors.</p>\n\n<p><strong>Negotiation and Finalisation of SPA </strong></p>\n\n<p>The Advisor will advise and work alongside UzSAMA in the final negotiation of the sale and purchase agreement. Having negotiated the terms of the agreement, the Advisor will be responsible for the drafting and advising on the execution of final documentation.</p>\n\n<p>Once the contract has been finalised, initialled by the preferred investor and approved by relevant Government bodies and agencies, the Advisor will be responsible for organising financial closure of the transaction, advising on the fulfilment of conditions arising from the SPA and addressing other closure issues that may arise.</p>\n\n<p><strong>Post privatization Control activities </strong></p>\n\n<p>The Advisor will submit recommendations on the parameters and measurement tools to assess the commitments to be undertaken by the purchasers based on investment and other commitments. This should be focused on objective and measurable undertakings made by the investor and should be backed up by appropriate training for UzSAMA personnel</p>\n\n<p><strong>Completion Phase Deliverables </strong></p>\n\n<p>The principal deliverables from this phase are:</p>\n\n<ul>\n\t<li>Offers evaluation report and recommendation for preferred bidders for each SOEs;</li>\n\t<li>Signed sale and purchase agreement for each of the SOEs; and</li>\n\t<li>Post privatization monitoring strategy.</li>\n</ul>\n\n<p>These deliverables may not be combined and are subject to review and approval by UzSAMA.</p>\n\n<p><strong>7. Minimum qualification requirements:</strong></p>\n\n<ul>\n\t<li>Advisor&#39;s experience with transactions involving SOEs in the mentioned sector in developing country context, including in CIS countries;</li>\n\t<li>A demonstrable track record of successfully completed privatization projects, with at least 5 similar projects conducted within 10 years period;</li>\n\t<li>In-depth knowledge and expertise in the specific sectors related to the assets being privatized, including regulatory environments, market dynamics, and operational challenges;</li>\n\t<li>Proficiency in financial analysis, valuation, legal frameworks, and transaction structuring related to privatization;</li>\n\t<li>Information about the team involved in the proposed Transaction, specifying the names of individuals and information about them: work experience, general transaction experience and specific transaction experience;</li>\n\t<li>Sufficient competence as well as human, time, and material resources to carry out the assigned tasks;</li>\n\t<li>Relevant experience in consultations on pre-sale preparation of assets.</li>\n</ul>\n\n<p><strong>7.1. Key Personal and Their Duties</strong></p>\n\n<p><strong>i) </strong><strong>&nbsp;Project Manager</strong></p>\n\n<ul>\n\t<li><strong>Qualifications</strong>:\n\n\t<ul>\n\t\t<li>Should have at list masters degree in economics, finance, project management or related fields.</li>\n\t\t<li>Proficiency in English required, knowledge of Russian and Uzbek is desirable.</li>\n\t\t<li>At least 7 years of experience in managing large-scale privatization and/or M&amp;A projects.</li>\n\t\t<li>Strong leadership and communication skills.</li>\n\t\t<li>Proven track record in project management and stakeholder engagement.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Duties </strong><em>(may include the following areas but not limited to)</em>:\n\t<ul>\n\t\t<li>Coordinate and manage the overall privatization project and reporting.</li>\n\t\t<li>Liaison with UzSama and key stakeholders.</li>\n\t\t<li>Ensure timely completion of project milestones and deliverables.</li>\n\t\t<li>Monitor and control project risks.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>ii)</strong><strong> Financial Analyst</strong></p>\n\n<ul>\n\t<li><strong>Qualifications</strong>:\n\n\t<ul>\n\t\t<li>Should have at list masters degree in economics, finance, audit or related fields.</li>\n\t\t<li>Proficiency in English required, knowledge of Russian and Uzbek is desirable.</li>\n\t\t<li>Strong background in financial analysis and due diligence.</li>\n\t\t<li>At least 7 years of experience in corporate finance and valuation.</li>\n\t\t<li>Proficiency in financial modeling and analysis.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Duties </strong><em>(may include the following areas but not limited to)</em>:\n\t<ul>\n\t\t<li>Lead detailed financial due diligence and the valuation efforts.</li>\n\t\t<li>Report on financial risks and opportunities.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>iii) </strong><strong>Legal Advisor</strong></p>\n\n<ul>\n\t<li><strong>Qualifications</strong>:\n\n\t<ul>\n\t\t<li>Should have at list masters degree in law or related fields.</li>\n\t\t<li>Proficiency in English required, knowledge of Russian and Uzbek is desirable.</li>\n\t\t<li>7 years of experience in corporate law and privatization.</li>\n\t\t<li>Strong analytical and drafting skills.</li>\n\t\t<li>Knowledge of local and international legal frameworks.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Duties </strong><em>(may include the following areas but not limited to)</em>:\n\t<ul>\n\t\t<li>Conduct legal due diligence on the companies to be privatized.</li>\n\t\t<li>Review and draft legal documents related to the privatization process including Sale and purchase agreement (SPA).</li>\n\t\t<li>Ensure compliance with relevant laws and regulations.</li>\n\t\t<li>Advise on legal risks and mitigation strategies.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>iv)</strong><strong> Industry/Market Expert</strong></p>\n\n<ul>\n\t<li><strong>Qualifications</strong>:\n\n\t<ul>\n\t\t<li>Should have at list masters degree in market economics, finance or related fields.</li>\n\t\t<li>Proficiency in English required, knowledge of Russian and Uzbek is desirable.</li>\n\t\t<li>In-depth knowledge of the specific industry.</li>\n\t\t<li>Proven minimum of 7 years of experience in market analysis and strategic planning.</li>\n\t\t<li>Ability to provide actionable insights and recommendations.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Duties </strong><em>(may include the following areas but not limited to)</em>:\n\t<ul>\n\t\t<li>Provide expert knowledge and insights on the industry/market in which the company operates.</li>\n\t\t<li>Conduct market assessments and prepare marketing strategy.</li>\n\t\t<li>Assist in the development of strategic recommendations for the privatization.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>v)</strong><strong> Environmental and Social Consultant</strong></p>\n\n<ul>\n\t<li><strong>Qualifications</strong>:\n\n\t<ul>\n\t\t<li>Should have at list masters degree in environmental and social or related fields.</li>\n\t\t<li>Proficiency in English required, knowledge of Russian and Uzbek is desirable.</li>\n\t\t<li>Strong background in environmental and social impact assessment.</li>\n\t\t<li>Minimum of 7 years of experience in managing environmental and social risks.</li>\n\t\t<li>Knowledge of relevant regulations and best practices.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Duties </strong><em>(may include the following areas but not limited to)</em>:\n\t<ul>\n\t\t<li>Assess the environmental and social impacts of the privatization.</li>\n\t\t<li>Prepare report on compliance with national environmental and social standards and prepare estimates of any remediation costs.</li>\n\t\t<li>Develop and implement strategies to mitigate negative impacts.</li>\n\t\t<li>Engage with local communities and stakeholders to address concerns.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>In addition, the Advisor will provide a junior liaison specialist, who will be based at the premises of UzSAMA and be responsible for liaising with relevant UzSAMA staff, preparation of all negotiation and approval documents (meeting minutes, etc.) as per procedures of Client and UzSAMA.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>7.2. Availability of key personal</strong>:</p>\n\n<ul>\n\t<li>The Advisor must ensure that key personnel are available online and in person for the duration of the project.</li>\n\t<li>A detailed plan demonstrating the availability and mode of use (online and in person) of human, time, and material resources to carry out the assigned tasks must be included in the proposal.</li>\n\t<li>The Advisor should provide written confirmation that the key personnel listed will be assigned to the project and specify their availability.</li>\n\t<li>Any changes in key personnel during the project must be approved by UzSAMA in writing.</li>\n</ul>\n\n<p><strong>Support to be Provided by UzSAMA</strong></p>\n\n<p>UzSAMA is fully committed to the successful completion of the privatization of selected companies and will offer support to the Advisor as set out below. The UzSAMA will assist the Advisor with the following:</p>\n\n<ul>\n\t<li>Providing prompt access to all relevant data necessary for the Advisor to undertake his work</li>\n\t<li>Appointing a privatization coordinator and one person that will serve as his replacement. The coordinator that will act as the first point of contact for the Advisor and ensure that the UzSAMA provides the on-going support and feedback required for the efficient execution of the transactions</li>\n</ul>\n\n<p><strong>Reporting Requirements</strong></p>\n\n<p>In addition to the deliverables described under each phase, the Advisor will be required to prepare and submit reports (in addition to the section 8 deliverables) on a regular basis throughout the assignment:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.3pt\">\n\t\t\t<p>Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.3pt\">\n\t\t\t<p>A report detailing any issues that come to light after the commencement of the tasks and a plan of time bound actions related to the specific privatization deal</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.35pt\">\n\t\t\t<p>Within one month of the start date of the contract</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.3pt\">\n\t\t\t<p>Progress reports</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.3pt\">\n\t\t\t<p>Monthly report summarising progress made describing the process followed and highlighting anticipated issues for the following phase</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.35pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The exact form and content of each report should be agreed between the Advisor and UzSAMA. All reports should be submitted in English and Russian to the UzSAMA privatization coordinator. The Advisor will be responsible for all translation and interpretation services they may require in implementation of the assignment.</p>\n\n<p>For the purposes of technical proposals evaluation, the following criteria will apply (Subject to approval by the Procurment Comission):</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:828px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:42.55pt\">\n\t\t\t<p><strong>#</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:375.65pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:78.45pt\">\n\t\t\t<p><strong>Points</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:42.55pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:375.65pt\">\n\t\t\t<p>Company information and relevant experience</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:78.45pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:42.55pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:375.65pt\">\n\t\t\t<p>Compliance of the proposed work plan and methodology with TOR requirements</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:78.45pt\">\n\t\t\t<p>30</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:42.55pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:375.65pt\">\n\t\t\t<p>Qualifications and competencies of key experts proposed for the assignment</p>\n\n\t\t\t<p>Sub-criteria:</p>\n\n\t\t\t<p>(a) general qualifications: education and training, number of years of experience, positions held, duration of work in a firm as a full-time employee, work experience in developing countries, etc. - 20%</p>\n\n\t\t\t<p>(b) eligibility for the assignment: education, training, work experience in the are, experience in the subject area, etc., applicable for this assignment - 70%</p>\n\n\t\t\t<p>(c) experience in the region: knowledge of the local languages, administrative systems, organization of government agencies, etc. - 10%</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:78.45pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:42.55pt\">\n\t\t\t<p>Total</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:375.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:78.45pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>Other requirements</strong></p>\n\n<p>Advisor shall provide a written statement of sufficient competence as well as human, time, material resources to perform the tasks assigned.</p>\n\n<p>&nbsp;</p>\n\n<p>Advisor will provide information on the presence of a conflict of interest and shall report to the&nbsp; (Client) if&nbsp; there any issue related&nbsp; to any conflict of interest, anytime.</p>\n\n<p>&nbsp;</p>\n\n<p>Advisor will follow the Section III of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised in November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Client and UzSAMA.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>Annex 1</em></strong></p>\n\n<p><strong>The list of SOEs that are being privatized </strong></p>\n\n<p><strong>with the involvement of the Advisor</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:485.75pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p><strong>Name of an enterprise</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p><strong>Sphere</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p><strong>State share</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Oʻzneftegazburgʻulash ishlari&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Drilling operations</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Silk avia&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Air traffic</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Information technology center&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Registration of a mobile device by international specific identification codes</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Temiryoʻlyoʻlovchi servis&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Food delivery service on trains</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Lemken Chirchiq&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Production of agricultural and forestry techniques</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>70</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Xumson sanatoriyasi&rdquo;LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Health resort</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Gold Moon Tashkent&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Production of jewelry and similar products</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Alskom&rdquo; JSC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Activities in the field of insurance</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>35.5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Xiva plaza&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Hotel services</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Xiva lokomotiv&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Hotel services</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Ekspo&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Hotel services</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>63.3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Boysunkoʻmir&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Coal mining</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:28.5pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:173.75pt\">\n\t\t\t<p>&ldquo;Shargʻunkoʻmir&rdquo; LLC</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:216.0pt\">\n\t\t\t<p>Coal mining</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.5pt\">\n\t\t\t<p>99.9</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>"},{"id":"OP00278090","notice_type":"Request for Expression of Interest","noticedate":"08-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-03-21T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"World","project_id":"P175329","project_name":"Gap Fund Partnership with GCOM","bid_reference_no":"C-1.12, C-2.12","bid_description":"Junior role MENA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Boulevard Charlemagne 1, Mezzanine Floor, 1041, Brussels, Belgium","contact_ctry_name":"Belgium","contact_email":"tsantapaola@globalcovenantofmayors.org","contact_name":"Tommaso  Santapaola","contact_organization":"Global Covenant of Mayors for Climate and Energy","contact_phone_no":"+32 474 79 34 11","contact_web_url":"https://www.globalcovenantofmayors.org/","submission_date":"2024-03-08T00:00:00Z","notice_text":"<p><br />\n<br />\n<br />\n<br />\n<br />\n<br />\n<br />\n&nbsp;</p>\n\n<p>REQUEST FOR EXPRESSION OF INTEREST (REoI)</p>\n\n<p>&nbsp;</p>\n\n<p>Gap fund - GCOM partnership</p>\n\n<p>&nbsp;</p>\n\n<p>Junior support for Middle East and North Africa</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>C40 Cities Climate Leadership Group, Inc.</p>\n\n<p>120 Park Avenue, 23rd Floor</p>\n\n<p>New York, NY 10017</p>\n\n<p>United States of America</p>\n\n<p>&nbsp;</p>\n\n<p>Global Covenant of Mayors for Climate &amp; Energy</p>\n\n<p>Boulevard Charlemagne 1 &ndash; Mezzanine Floor</p>\n\n<p>1000 Brussels</p>\n\n<p>Belgium</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>March 8,&nbsp; 2024</p>\n\n<p><br />\n&nbsp;</p>\n\n<p><strong>C40 Cities Climate Leadership Group Inc. (&ldquo;C40&rdquo;)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>C40 is a network of nearly 100 mayors of the world&rsquo;s leading cities, who are working to deliver the urgent action needed right now to confront the climate crisis, and create a future where everyone, everywhere can thrive. Mayors of C40 cities are committed to using a science-based and people-focused approach to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities. Through a Global Green New Deal, mayors are working alongside a broad coalition of representatives from labour, business, the youth climate movement and civil society to go further and faster than ever before.&nbsp;</p>\n\n<p>The strategic direction of the organisation is determined by an elected Steering Committee of C40 mayors which is co-chaired by Mayor Sadiq Khan of London, United Kingdom, and Mayor Yvonne Aki-Sawyerr of Freetown, Sierra Leone. Three term Mayor of New York City Michael R. Bloomberg serves as President of the C40 Board of Directors, which is responsible for operational oversight. A nine-person management team, led by Executive Director, Mark Watts, leads the day-to-day management of C40. C40&rsquo;s three core strategic funders are Bloomberg Philanthropies, the Children&rsquo;s Investment Fund Foundation (CIFF) and Realdania.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>To learn more about the work of C40 and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.<br />\n&nbsp;</p>\n\n<p><strong>Global Covenant of Mayors for Climate &amp; Energy</strong></p>\n\n<p>The Global Covenant of Mayors for Climate &amp; Energy (GCoM) is the largest global alliance for city climate leadership, uniting a global coalition of over 12,000 cities and local governments and 100+ supporting partners to take ambitious and measurable climate and energy action. The cities and partners of GCoM share a long-term vision of supporting voluntary action to combat climate change and towards a resilient and low-emission society.&nbsp;</p>\n\n<p>In addition to providing resources and training opportunities, the GCoM gives cities a unified voice on the international stage, ensuring the local level is heard in global policy debates.</p>\n\n<p>The Global Covenant of Mayors is comprised of 13 Regional and National Covenants that support signatory cities in line with local needs. By signing up via their Regional or National Covenant, cities become part of a global movement.</p>\n\n<p>Hence, GCoM serves cities and local governments by mobilizing and supporting ambitious, measurable, planned climate and energy action in their communities by working with city/regional networks, national governments, and other partners to achieve our vision.&nbsp;</p>\n\n<p>Led today by UN Special Envoy on Climate Ambition and Solutions Michael R. Bloomberg and European Commission Executive Vice President Frans Timmermans, the coalition comprises cities across 6 continents and 142 countries, representing over 900 million people or more than 10% of the global population.<br />\nTo learn more about the work of GCoM and our cities, please visit our Website, or follow us on Twitter, Instagram, Facebook and LinkedIn.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>2. Summary, Purpose and Background of the Project</strong></p>\n\n<p>&nbsp;</p>\n\n<p>About the City Climate Finance Gap Fund:</p>\n\n<p>The City Climate Finance Gap Fund (Gap Fund) launched in September 2020, aims to help cities in developing and emerging countries transition towards low-carbon and climate-resilient pathways. This will be achieved by addressing the critical lack of financing necessary to formulate city climate strategies and analyze key actions, identifying the actions for cities to pursue to enhance their capacities, promoting improved coordination among key stakeholders, and supporting the preparation of projects from planning and strategy development to project concept and pre-feasibility stage. The City Climate Finance Gap Fund aims to help cities in developing and emerging economies transition to low-carbon, climate-resilient pathways by providing technical assistance and improving access to financing.</p>\n\n<p>&nbsp;</p>\n\n<p>About the project:</p>\n\n<p>The project seeks to (i) raise awareness of cities and city networks about the Gap Fund. This encompasses the development and dissemination of awareness raising materials, and the delivery of knowledge exchange events to facilitate partnerships and promote low-carbon, climate resilient city development activities; (ii) Support to cities through outreach activities that include the assessment of cities&rsquo; climate challenges and priorities, and the delivery of knowledge sharing activities, including training and workshops. (iii) the third component will support overall coordination and project implementation.</p>\n\n<p>&nbsp;</p>\n\n<p>The project will consist of three components, namely: (i) Awareness Raising, (ii) Support to Cities, and (iii) Project Management as described in the following sections.</p>\n\n<p>&nbsp;</p>\n\n<p>Component 1: Awareness Raising. This component will support selected cities by carrying out climate awareness activities. It will comprise two activities:&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Development and dissemination of awareness raising materials on the existence and operation of the CCFGF in different regions; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge exchange events with relevant stakeholders to facilitate partnerships and promote low-carbon, climate-resilient city development activities.&nbsp;</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Component 2: Support to Cities. This component will focus on outreach activities to promote low-carbon, climate-resilient city development. It will comprise two activities:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Assessment of cities&rsquo; climate challenges and priorities in connection with developing, financing and implementing climate-smart projects; and</p>\n\t</li>\n\t<li>\n\t<p>Knowledge sharing activities, including trainings and workshops, with relevant stakeholders on existing tools and data available on emissions reduction, climate resilience and energy access quantification.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Component 3: Project Management. This component will support overall coordination and project implementation. The Global Secretariat at GCOM will function as the Project Implementation Unit (PIU) responsible for overall project monitoring and evaluation and reporting. The PIU will liaise with the World Bank and EIB Gap Fund Secretariats and work closely with GCOM&rsquo;s regional and national chapters. This component will also finance incremental operating costs such as office administration, design, printing and translation, and information technology and conduct project audits.</p>\n\n<p>&nbsp;</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>Outputs/Work Assignment:</p>\n\n<ul>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Engage regional local governments in Gap Fund trainings and events, collaborating with the Gap Fund - GCOM Global team and the Regional Covenant of Mayors in MENA.</p>\n\t</li>\n\t<li>\n\t<p>Provide support during the Gap Fund application process for MENA cities, identifying needs and challenges that can be addressed by Gap Fund technical assistance and reporting findings to the global team.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support to the GCOM-Gap Fund Global team&rsquo;s engagement in the MENA region, in coordination with the Regional Covenant.</p>\n\t</li>\n\t<li>\n\t<p>Conduct dialogues, meetings, interviews, and workshops with local government representatives and stakeholders in MENA cities to raise awareness of the Gap Fund and support the submission of quality Expressions of Interests.</p>\n\t</li>\n\t<li>\n\t<p>Translate relevant Gap Fund materials into Arabic and develop advocacy messages to encourage regional city applications.</p>\n\t</li>\n\t<li>\n\t<p>Facilitate and promote engagement between cities, partners, local governments, and stakeholders to increase awareness and promote low-carbon, climate- resilient city development activities.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to communication products, knowledge-sharing activities, and awareness-raising events, including writing articles, reports, and presentations.</p>\n\t</li>\n\t<li>\n\t<p>Participate in outreach and knowledge exchange activities, supporting the communications team.</p>\n\t</li>\n\t<li>\n\t<p>Overall goal: Raise awareness of the Gap Fund among cities and city networks in the MENA region, improving coordination and implementing low-carbon and climate-resilient city development projects.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The goal is to ensure clear communication and engagement with stakeholders across different regions, languages, and contexts through high-quality, accurate and culturally-sensitive interpretation and translation.</p>\n\n<p><br />\n<br />\n<br />\n<br />\n&nbsp;</p>\n\n<p><strong>3. Request for Expression of Interest (REoI) Guidelines</strong></p>\n\n<p>&nbsp;</p>\n\n<p>This Request for Expression of Interest (REoI) represents the requirements for an open and competitive process. Expression of Interest will be accepted until 6:00 pm CET, May 21, 2024. Any expression of interest received after this date and time will not be accepted. All expressions of interest should include clear timetables, how they would work with C40, clear costs and detail on experience in this area.</p>\n\n<p>The expression of interest should give C40 evaluators all the information they need to assess your bid. Please clearly indicate where applicable:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>How your expression of interest is responsive to the Evaluation Criteria;</p>\n\t</li>\n\t<li>\n\t<p>The assumptions you are making about the project;&nbsp;&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Risks you have identified and appropriate mitigation measures;</p>\n\t</li>\n\t<li>\n\t<p>Information about your fee;</p>\n\t</li>\n\t<li>\n\t<p>Proposed timeline of implementation;</p>\n\t</li>\n\t<li>\n\t<p>Any additional support that you need to make the project a success, including any inputs you will need from third parties or C40 staff;</p>\n\t</li>\n\t<li>\n\t<p>Proposed working partnership with C40, including (as applicable) project governance and management, key personnel, key roles and responsibilities, and escalation procedure for issues.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>You must include adequate information about how your costs were calculated to enable evaluation of cost reasonableness.&nbsp;</p>\n\n<p>The expression of interest should clearly indicate the required input from C40 staff, the timeline of implementation, and any required background work or set-upset up. Furthermore, the submission should show how the respondent intends that the project governance and management should work. This should, as a minimum, cover the proposed working partnership with C40, key roles and responsibilities, reporting, change requests, escalation of issues, sign-off of work stages, and acceptance criteria.&nbsp;</p>\n\n<p>Respondents are also required to set out any risks and assumptions made in planning this work. Where risks are identified appropriate management and mitigation strategies should also be outlined. The expression of interest should include details on how a risk assessment would be completed and what that would include.</p>\n\n<p>If the individual consultant submitting an expression of interest must outsource or contract any work to meet the requirements contained herein, this must be clearly stated in the EoI. Additionally, all costs included in expression of interest must be all-inclusive to include any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p>All costs must be itemized to include an explanation of all fees and costs.</p>\n\n<p>Contract terms and conditions will be negotiated upon selection of the winning bidder for this REoI. All contractual terms and conditions will be subject to review by C40 legal department and will include scope, budget, schedule and other necessary items pertaining to the project.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Supplier Diversity</strong></p>\n\n<p>C40 is committed to supplier diversity and inclusive procurement through promoting equity, diversity and inclusivity in our supplier base. We believe that by procuring a diverse range of suppliers, we get a wider range of experiences and thoughts from suppliers and thus are best able to deliver to the whole range of our diverse cities and the contexts that they operate within.</p>\n\n<p>We strongly encourage suppliers (individuals) that are diverse in terms of age, nationality, gender identity, sexual orientation, physical or mental ability, ethnicity and perspective to put forward a EoI to work with us.</p>\n\n<p>Feel welcome to refer to C40&rsquo;s Equity, Diversity and Inclusion Statement as supplier diversity and inclusive procurement is one element of applying equity, diversity and inclusion to help the world limit global heating to 1.5&deg;C and build healthy, equitable and resilient communities.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contract&nbsp;</strong></p>\n\n<p>Please note this is a contract for professional services and not a grant opportunity. Individual consultants unable to accept contracts for professional services should not submit bids. This opportunity will be awarded in line with the World Bank &ndash; Contract for small assignment &ndash; Time based template which is meant for individual consultants.</p>\n\n<p>These terms and conditions are non-negotiable. Organisations unable to accept them as drafted should not submit bids in connection with this opportunity.</p>\n\n<p>If C40 are unable to execute a contract with the winning bidder of this competitive process, we reserve the right to award the contract to the second highest ranked bidder.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Subcontracting</strong><br />\n<br />\nIf the individual consultant submitting an expression of interest needs to subcontract any work to meet the requirements of the expression of interest, this must be clearly stated. All costs included in expression of interest must be all-inclusive of any outsourced or contracted work. Any expression of interest which call for outsourcing or contracting work must include a name and description of the organisations being contracted.&nbsp;</p>\n\n<p><br />\n&nbsp;</p>\n\n<p><strong>4. Submission and Timeline</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Request for Expression of Interest Timeline:</strong></p>\n\n<p>&nbsp;</p>\n\n<table>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>REoI Timeline</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>Expected&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Request for Proposals sent out</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>March 8, 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Deadline for receiving EoI</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>March 21, 2024&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Evaluation of EoI received</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>March 22, 2024 &ndash; March 27 , 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Short list of individual Consultants: Interviews and assessments</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>March 28, 2024 &ndash; April&nbsp; 11 , 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Selection decision made</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>April 12, 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Draft Negotiated Contract</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>April 15, 2024 &ndash; April 30, 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Notification of Award</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>May 7, 2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>5. Scope, Objectives and Selection Criteria</strong>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Level: Junior</p>\n\n<p>Title: Junior support</p>\n\n<p>Geographical Scope: Middle East and North Africa</p>\n\n<p>Location: Preferable within the MENA region</p>\n\n<p>Expected start date: May 2024</p>\n\n<p>Duration: Fixed term until December 31, 2024</p>\n\n<p>Objectives of the assignment:</p>\n\n<p>C40 and the Global Covenant of Mayors (GCoM) are partnering with the City Climate Finance Gap Fund (Gap Fund) to raise awareness on the Gap Fund and support cities in accessing this technical assistance. Specifically in the Middle East and North Africa region, the objectives of this assignment are:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<p>Facilitate engagement between cities and stakeholders to promote low-carbon and climate-resilient city development in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Map cities, local governments, partners, and organizations involved in climate adaptation, mitigation, and resilience in the MENA region.</p>\n\t</li>\n\t<li>\n\t<p>Offer comprehensive support for the GCOM-Gap Fund partnership activities and engagement in the MENA region..</p>\n\t</li>\n\t<li>\n\t<p>Engage regional local governments and relevant partners and stakeholders in activities to raise awareness about the Gap Fund.</p>\n\t</li>\n\t<li>\n\t<p>Deliver workshops and outreach events for cities aiming to accelerate low-carbon development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Provide technical assistance for MENA cities aiming to apply to the&nbsp; Gap Fund. Identify and address city challenges during the EoI completion process.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Contribute to develop communication products and support knowledge-sharing activities.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Duties and accountabilities:</p>\n\n<p>&nbsp;</p>\n\n<p>Mapping of key stakeholders in the MENA region:&nbsp; Database of relevant cities, local governments, partners and organizations in MENA involved in climate resilience and mitigation efforts.</p>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Stakeholder database</p>\n\t</li>\n\t<li>\n\t<p>Monthly reports on outreach and awareness raising activities</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Awareness raising and engagement:</p>\n\n<ul>\n\t<li>\n\t<p>Facilitation of Gap Fund awareness raising&nbsp; events for local governments.</p>\n\t</li>\n\t<li>\n\t<p>Engage with cities and provide support to facilitate low-carbon and climate resilient development.&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Support the organization and delivery of information sessions, meetings and workshops.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Meeting/workshop reports</p>\n\t</li>\n\t<li>\n\t<p>Gap Fund training materials</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Implementation support:</p>\n\n<ul>\n\t<li>\n\t<p>Liaise with project partners like Regional Covenant, cities and other stakeholders.</p>\n\t</li>\n\t<li>\n\t<p>Contribute to reports and knowledge products on project progress, challenges and recommendations.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Deliverables:</p>\n\n<ul>\n\t<li>\n\t<p>Progress reports</p>\n\t</li>\n\t<li>\n\t<p>Presentations</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Selection Criteria:</p>\n\n<ul>\n\t<li>\n\t<p>Graduate degree in relevant fields like urban planning, economics, environment, engineering.</p>\n\t</li>\n\t<li>\n\t<p>3+ years experience in areas like sustainable development and climate change.</p>\n\t</li>\n\t<li>\n\t<p>Strong project management, analytical, communication and presentation skills.</p>\n\t</li>\n\t<li>\n\t<p>Fluency in written and spoken English and Arabic.</p>\n\t</li>\n\t<li>\n\t<p>Experience working in multi-cultural environments.</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>6. Additional Information</strong></p>\n\n<p>The potential post-holder is asked to submit an EoI including CV and Cover Letter.</p>\n\n<p>The total expected number of days for this role is between 80 and 110 days for the duration of the contract but this might be subject to change. Please submit your estimated daily fee.</p>\n\n<p>This position might require travelling and related travel expenses will be covered by the project upon approval.&nbsp;</p>\n\n<p>All costs incurred in connection with the submission of this EoI are non-refundable by C40.&nbsp;</p>\n\n<p><br />\n<strong>7. C40 Policies&nbsp;</strong></p>\n\n<p>C40 expects third parties to able to abide by these C40 policies:</p>\n\n<ul>\n\t<li>\n\t<p>Non-Staff Code of Conduct Policy here</p>\n\t</li>\n\t<li>\n\t<p>Equity , Diversity and Inclusion Policy here</p>\n\t</li>\n\t<li>\n\t<p>Non-Staff Travel and Expenses Policy - here</p>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>08. &nbsp; &nbsp; Submissions&nbsp;</strong></p>\n\n<p>Each Potential Supplier must submit CV, Cover Letter, and estimated daily fee to the email addresses below by March 21, 2024 before 6:00 pm CET:&nbsp;</p>\n\n<ol>\n\t<li>\n\t<p>Tommaso Santapaola, Head of Operations and Finance (GCoM),&nbsp; tsantapaola@globalcovenantofmayors.org&nbsp;</p>\n\t</li>\n\t<li>\n\t<p>Ghislaine Kieffer, Head of Leadership Support and Strategy (GCoM), gkieffer@globalcovenantofmayors.org</p>\n\t</li>\n</ol>\n\n<p>The subject of the email should read as follows: Junior support for Middle East and North Africa - GCOM-GAP FUND</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Disclaimer</strong></p>\n\n<p>C40 will not accept any liability or be responsible for any costs incurred by Potential Suppliers&nbsp; in preparing a response for this REoI.<br />\n<br />\nNeither the issue of the REoI, nor any of the information presented in it, should be regarded as a commitment or representation on the part of C40 (or any of its partners) to enter into a contractual arrangement. Nothing in this REoI should be interpreted as a commitment by C40 to award a contract to a Potential Supplier as a result of this procurement, nor to accept the lowest price or any tender.<br />\n&nbsp;</p>"},{"id":"OP00137282","notice_type":"Request for Expression of Interest","noticedate":"29-Jul-2021","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2021-08-09T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P168180","project_name":"Institutional Capacity Building Project","bid_reference_no":"PPPDA-HOSPITAL-LOCALLEGAL-CS-CQS","bid_description":"Uzbekistan Hospital Consolidation Project Local Legal Consultant","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"29, Istiklol str. Tashkent","contact_ctry_name":"Uzbekistan","contact_email":"piu_mof@mail.ru","contact_name":"Foziljon Kalandarov","contact_organization":"Project Implementation Unit under Ministry of Finance of the Republic of Uzbekistan","contact_phone_no":"+998907380050","contact_web_url":"www.mf.uz","submission_date":"2021-07-29T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST<br />\n(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Uzbekistan </strong></p>\n\n<p><strong>Institutional Capacity Building Project </strong></p>\n\n<p>Credit No.: IDA 6431-UZ</p>\n\n<p><strong>Assignment Title:</strong><strong> Uzbekistan Hospital Consolidation Project Local Legal Consultant</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>.: <strong>PPPDA-HOSPITAL-LOCALLEGAL-CS-CQS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Ministry of Finance of the Republic of Uzbekistan has received financing from the World Bank toward the cost of the Institutional Capacity Building Project and intends to apply part of the proceeds for consulting services on behalf of the PPPD Agency under the Ministry of Finance and the Ministry of Health of the Republic of Uzbekistan.</p>\n\n<p>The Consulting services (&ldquo;the Services&rdquo;) include consulting legal services for conducting legal due diligence, to be submitted to the IFC and the International Legal Consultant, to identify all legal issues relevant to the successful implementation of the Project and will prepare a detailed due diligence report.</p>\n\n<p>Implementation period up to 12-24 months, ensuring full consistency with the Terms of Reference (TOR) attached in this REOI.</p>\n\n<p>The Ministry of Finance of the Republic of Uzbekistan now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services submitting directly to the piu_mof@mail.ru.</p>\n\n<p>The qualification requirements for the Consultants are:</p>\n\n<ul>\n\t<li>Providing legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector);</li>\n\t<li>Experience in providing the legal advice in investment projects in infrastructure and social sector in Uzbekistan in the past 10 years (preferably experience in healthcare sector).;</li>\n</ul>\n\n<p>The Local Legal Consultant and the proposed team will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference.</p>\n\n<p>The attention of interested Consultants is drawn to Section III of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Ministry of Finance of the Republic of Uzbekistan.</p>\n\n<p>A Consultant will be selected in accordance with the Consultant Qualification Selection (CQS) method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours from 9:00 a.m. to 18:00 p.m. Tashkent time.</p>\n\n<p>Expressions of interest must be delivered in a written form in English, Russian or Uzbek languages to the address below (in person, or by mail, or by e-mail) August 9th 2021.</p>\n\n<p>&nbsp;</p>\n\n<p>Project Implementation Unit under the<br />\nMinistry of Finance of the Republic of Uzbekistan</p>\n\n<p>Attn: Foziljon Kalandarov, Manager of the Project</p>\n\n<p>Uzbekistan, 100017, Tashkent city, 29, Istiklol St.</p>\n\n<p>Tel: +998907380050</p>\n\n<p>E-mail: <em>piu_mof@mail.ru</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>As part of the EOI, the consultant should include the following information:</em></p>\n\n<ul>\n\t<li>Consulting Firm Information</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:477.0pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Country of Incorporation:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Acronym:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>EOI Submission Authorized by:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Associations (Joint Venture or Sub-consultancy)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:476.6pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.5pt; width:76.0pt\">\n\t\t\t<p>Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:59.95pt\">\n\t\t\t<p>Acronym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:88.65pt\">\n\t\t\t<p>Country of Incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:76.5pt\">\n\t\t\t<p>Joint Venture (JV) or Sub-consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>EOI Submission Authorized By</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:85.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Present the rationale for and benefits of working in association (JV or Sub-consultant) with others rather than undertaking the assignment independently (as appropriate). Describe the proposed management and coordination approach of the association and the role of each firm</em>.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Technical competence </strong></li>\n</ul>\n\n<p><em>Project References - highlight the technical qualifications of your entity/consortium in undertaking similar assignments. Provide details of past experiences working with similar project authorities</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Geographical experience </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Project References, present experiences in similar geographic areas.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Management Competence </strong></li>\n</ul>\n\n<ul>\n\t<li>Describe standard policies, procedures, and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.</li>\n\t<li>How your firm/consortium handles complaints concerning the performance of experts or quality of the reports submitted for previous and future assignments? What internal controls are in place to address and resolve complaints.</li>\n\t<li>How you ensure the quality of your firm&rsquo;s/consortium&rsquo;s performance over the life of assignments.</li>\n</ul>\n\n<ul>\n\t<li><strong>Projects references </strong></li>\n</ul>\n\n<p>Present relevant projects to demonstrate the firm&rsquo;s technical qualifications and geographical experience (at least 5 maximum 10 projects).</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:484.15pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:30.05pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:74.15pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:3.0cm\">\n\t\t\t<p>Project start date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:71.9pt\">\n\t\t\t<p>Project end date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:50.6pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.65pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; vertical-align:bottom; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice in investment projects in infrastructure and social sector in Uzbekistan in the past 10 years (preferably experience in healthcare sector).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Summary for the Projects listed above</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Eligibility </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>We, the undersigned, certify to the best of our knowledge and belief:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We have read the advertisement, including the terms of reference (TOR), for this assignment (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the TOR for this activity (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We confirm that the project references submitted as part of this EOI accurately reflect the experience of the specified firm/consortium. (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Ensuing assignment resulting from our work product under this assignment, our firm, JV member or sub-consultant, and the expert(s) will be disqualified from short-listing and participation in the assignment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>The lead entity and JV member or sub-consultant are NOT currently sanctioned by or other MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p><strong>Uzbekistan Hospital Consolidation Project</strong></p>\n\n<p><strong>Local Legal Consultant</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>I. </strong>PROJECT BACKGROUND</p>\n\n<p><strong>Introduction</strong></p>\n\n<p>Healthcare is one of the priority sectors for the Government of Uzbekistan (GoU) in its plans for improving public services. Currently, care provision is predominantly based on a network of small, public mono-profile hospitals that treat separate disease categories and population groups (e.g., neurological and psychiatric hospitals, cardiology and emergency hospitals). At the same time, lack of investment in requisite infrastructure and equipment has led to many of these facilities being in need of major rehabilitation or new construction, and only very few being able to provide complex medical care in line with international best practice</p>\n\n<p>The GoU through the Ministry of Health (MoH) and the Ministry of Finance (MoF) is therefore &ndash; and especially against the backdrop of the COVID-19 crisis &ndash; vested in upgrading the country&rsquo;s hospital capacity to improve the efficiency, safety and quality of services provided. In particular, the MoH is focused on transforming the present network of mono-profile hospitals by consolidating them into contemporary multi-profile facilities which would allow for treatment of patients facing multiple conditions. The underlying objective is both to optimize public sector spending and to attract private investments in Uzbekistan&rsquo;s health sector to help create modern hospital infrastructure and introduce quality facility management.</p>\n\n<p>1. Project Description</p>\n\n<p>To pilot the above-noted plans, Ministry of Health (MoH) and the Ministry of Finance (MoF) (together - the Client) envisages to combine several outdated mono-profile public hospitals in a pilot region into a new multidisciplinary greenfield hospital with the help of a competitively selected private investor under a public-private partnership (PPP) model (the Project). As such, the Project will be structured as a Private Finance Initiative (PFI), whereby the private partner is expected to design, build, finance and maintain the respective hospital, while the public partner continues to be responsible for the provision of all clinical services. Expected Project size will be confirmed during project preparation. While the PFI model is contemplated under Uzbekistan&rsquo;s PPP law of 2019, the Project would be the first hospital PFI in the country where hospitals are prevalently owned by the MoH.</p>\n\n<p>By choosing a PPP structure, the GoU specifically expects (i) to benefit from the expertise of specialized companies in implementing best-practice as regards high-quality hospital design that leads to improved clinical workflows and efficiency gains in maintenance and management services; (ii) to ensure on time and within budget delivery; (iii) to benefit from potential technical innovations; and (iv) to access much needed private financing for further development of the country&rsquo;s healthcare sector.</p>\n\n<p>In this context and making use of a World Bank loan earmarked for funding of PPP preparation activities across all sectors, the GoU wishes to appoint a local law firm (the Local Legal Consultant), to provide legal support during the implementation of the Project.</p>\n\n<p>The support of the Local Legal Consultant will relate to all legal aspects of the PPP transaction with a focus on local legislation, including legal due diligence, support to the preparation of tender documents and the PPP agreement and/or other legal documents, and legal support in conducting a fair and transparent tender process, as specified further in these Terms of Reference.</p>\n\n<p>An international law firm (the International Legal Consultant) will be appointed separately (see the Terms of Reference included under Annex 1). The Local Legal Consultant will work jointly and in close collaboration with the International Legal Consultant to support the IFC and the GoU in implementing the Project.</p>\n\n<p>The Local Legal Consultant will work under the coordination and supervision of both the Client and IFC and will report to the IFC team on all the aspects and deliverables of this assignment. The Local Legal Consultant will equally liaise and collaborate with the technical consultants under the Project as well as any other consultants that IFC as the lead transaction advisor recruits. In delivering its services, the Local Legal Consultant is expected to follow the below phased approach according to which IFC&rsquo;s advisory services will be structured.</p>\n\n<p>&nbsp;</p>\n\n<p>2. Project Phases</p>\n\n<ul>\n\t<li>Phase 0 &ndash; preliminary assessment - will entail the selection of the priority region, a needs assessment for the, including identification of specific mono-profile outdated facilities to consolidate and determine optimal capacity or the new hospital.</li>\n</ul>\n\n<p>This phase is expected to be completed at the time of the Consultant&rsquo;s appointment and does hence not form part of the expected scope of work (as detailed below).</p>\n\n<ul>\n\t<li>Phase 1 &ndash; due diligence, and Phase 2 &ndash;&nbsp; tender process, as described further in the TORs.</li>\n</ul>\n\n<p>The duration of each phase may be affected as a result of decisions that the Client or IFC may make from time to time in connection with the Project. The Client and IFC may also instruct the Local Legal Consultant to suspend work during any delay period.</p>\n\n<p>&nbsp;</p>\n\n<p>II. SCOPE OF WORK</p>\n\n<p>Phase 1 &ndash; Due Diligence and Transaction Structuring</p>\n\n<p>1. Legal Due Diligence</p>\n\n<p>The Local Legal Consultant will conduct legal due diligence, to be submitted to the IFC and the International Legal Consultant, to identify all legal issues relevant to the successful implementation of the Project and will prepare a detailed due diligence report setting these out.</p>\n\n<p>Without limitation, the due diligence report must include the following:</p>\n\n<ol>\n\t<li>Taking note of relevant findings of Phase 0 analysis, describe and comment on the legal framework for procuring private sector participation and the tendering process (including review of existing and proposed PPP and procurement policies, laws and regulations), list of documents required for preparation and implementing a PPP project, as well as relevant approvals that will be needed in this respect;</li>\n\t<li>Describe the legal, institutional, and regulatory framework relevant to Uzbekistan&#39;s health sector, including applicable legislation and relevant regulators or stakeholders.&nbsp; This includes laws and regulations related to the construction, operation and maintenance of hospitals and legislation related to hospital operations and ancillary services.&nbsp; The analysis should identify any legal, regulatory and/or institutional issues that may impact the Project and propose solutions;</li>\n\t<li>Identify relevant aspects of public finance legislation and processes, including, among others, the social security system, taking into account timing and process for budgets and payment for services;</li>\n\t<li>Provide legal assurance that the technical recommendations are within the scope of specific regulations or guidance issued by government bodies or recognized international health organizations;</li>\n\t<li>Identify any potential land issues, including any implications for construction of hospitals, and advise both generally and specifically in relation to any rights of way or other land related authorizations;</li>\n\t<li>Describe any legal and regulatory, licensing, customs, hospital specific accreditation issues that may impact a foreign and/or domestic private sector party&rsquo;s ability to implement the Project. Specifically analyse the possibility and conditions for foreign health professionals to practice in the country;</li>\n\t<li>Suggest possible changes to existing legal or regulatory frameworks concerning use of the PFI model for health projects which may be considered by the Client to allow for increased participation of private sector companies;</li>\n\t<li>Identify any approvals, licenses and authorisations that are required for the Project, including those related to environmental, social, labor, health and safety aspects, and prepare an analysis of the timing and procedure required for such approvals;</li>\n\t<li>Review and comment on any existing contracts, agreements, titles, relevant to the MoH and other relevant bodies or stakeholders or party, which may affect the Project. For the avoidance of doubt, this review should include any (previous or existing) lease titles to the proposed sites to ensure that these do neither present an obstacle to the proposed arrangement nor imply any potential liabilities for either the Client or the successful bidder.</li>\n\t<li>Identify and make recommendations in relation to potential environmental and social issues; labor issues; competition issues applicable to the Project;</li>\n\t<li>Identify types of taxes, exemptions and benefits that may be applicable to the Project;</li>\n</ol>\n\n<p>The Local Legal Consultant will also be expected to:</p>\n\n<ol>\n\t<li>Develop, with IFC, security arrangements that could be utilized or are likely to be required for the transaction; and</li>\n\t<li>Participate, with IFC, in discussions on the structure of the transaction.</li>\n\t<li>&nbsp;</li>\n</ol>\n\n<p>In formalizing the legal due diligence report, the Local Legal Consultant is to include the following:</p>\n\n<ol>\n\t<li>an executive summary of all material issues and risks identified in the report and the recommendations on how to address them;</li>\n\t<li>a summary of all applicable findings (including laws, contractual provisions, permits, etc. as set out above) in a level of detail appropriate for the Project and the intended audience;</li>\n\t<li>a risk matrix that identifies material risks during the construction and operational phases, suggests allocation of these risks as well as mitigation measures while pointing out any legal issues, uncertainties or potential liabilities which the Client should understand, consider and approve;</li>\n\t<li>a road map for implementation of the PPP Project, including all legal steps needed to complete the Project. Summarize the legal requirements and prerequisites for a contract award in terms of due process to be followed and approvals/ clearances to be obtained by relevant authorities, prior to bid award.</li>\n</ol>\n\n<p>Based on the results of the above analysis, the Local Legal Consultant in collaboration with the International Legal Consultant, will be required to provide inputs to an executive summary Project presentation as well as to relevant legal sections of the Project Assessment Document (PAD) and the Project Concept, both of which are required documents under Uzbek PPP legislation. The final version of the legal due diligence report, in which the Local Legal Consultant will have incorporated inputs from both the IFC, the International Legal Consultant and the Client following their review, is to be annexed to the PAD. The structure of the PAD (unofficial translation from the Uzbek language for reference only) is provided in Annex 2. In case of legislative changes as regards the drafting requirements or the PAD and/or the Project Concept, or introduction of other documents for preparation and implementation of PPP projects, the Local Legal Consultant is expected to provide support and modifications. IFC will be responsible for preparation of the PAD and Project Concept.</p>\n\n<p>2. Structuring Analysis</p>\n\n<p>Based on the findings in the due diligence report, the Local Legal Consultant and the International Legal Consultant, will assist IFC in its analysis of available structuring options and in framing recommendations to the Client, including analysis and recommendations on the allocation of legal, regulatory, and other risks for the Project, and benchmarking against other similar projects. Tasks under the structuring analysis include:</p>\n\n<ol>\n\t<li>Review and comment on the transaction structure for the Project as proposed by the IFC team and any risks related to the proposed transaction structure from the perspective of local legislation and practice;</li>\n\t<li>Support the International Legal Consultant in relation to local legislative matters in drafting a brief term sheet outlining the key terms and conditions that will ensure the Project&rsquo;s bankability; and</li>\n\t<li>Support the International Legal Consultant and IFC in relation to local legislation in summarizing available structuring options for the Project, together with analysis of the extent to which the above risks apply to each and to which extent the above bankability terms are met by each option;</li>\n\t<li>Assist the Client and IFC with providing inputs to or preparing any additional legal documents that may be required to obtain approvals as stipulated under Uzbekistan&rsquo;s PPP legislation to advance the Project to tender stage.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>3. Promoting the Project</p>\n\n<p>The Local Legal Consultant, together with the International Legal Consultant, will support the Client and IFC in follow-up consultations, including with other stakeholders, to assist them to reach a decision on whether and how to proceed further with the Project. Specifically, the Local Legal Consultant, together with the International Legal Consultant, will assist the Client and IFC with the legal aspects of the marketing effort to potential investors (lenders and sponsors) by replying to written questions, and participating in conference calls or meetings.</p>\n\n<p>If the Client approves the Project to proceed to tendering stage, the Local Legal Consultant will then support the International Legal Consultant and IFC as outlined under Phase 2.</p>\n\n<p>&nbsp;</p>\n\n<p>Phase 2 &ndash; Legal Advisory Support During Tender Process</p>\n\n<p>4. Bid Process</p>\n\n<p>As noted under Section I, the Project will be tendered through an independent bid process. The Local Legal Consultant will be required to work in close collaboration with the International Legal Consultant to support the Client and IFC in the tender process.</p>\n\n<p>Specific tasks of the Local Legal Consultant during Phase 2 will include the following:</p>\n\n<ol>\n\t<li>Preparation of Project Documents. It is envisioned that the Local Legal Consultants will prepare first drafts of Request for Qualification (RFQ), Request for Proposal (RFP), the draft PPP Agreement (together the Project Documents) and any other agreements required for the Project in accordance with procurement laws and regulations (e.g. land lease related documents, corporate guarantee, etc.), for review by the International Legal Consultant and subsequent review by IFC.&nbsp; The number and nature of the Project Documents will depend on the transaction structure chosen by the Client as a result of the Phase 1 work.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>In preparation of the initial drafts of the Project Documents, the Local Legal Consultant will ensure their compliance with local legislation and regulatory framework requirements., while the International Legal Consultant will ensure their alignment with best international practice. The International Legal Consultant will be responsible for the quality of the final set Project Documents.</p>\n\n<ol>\n\t<li>In collaboration with the IFC and the International Legal Consultant, support in finalizing evaluation criteria, taking into account local legislative requirements, and assessing the applications against the pre-qualification criteria, and taking into account local legislative requirements;</li>\n\t<li>Drafting relevant regulatory documents, such as government decrees if required for the Project, regulations of the Tender commission, etc.</li>\n\t<li>Drafting relevant legal sections in the project marketing documents, such as information memorandums, project presentations and other materials to be delivered to the Client and to bidders;</li>\n\t<li>Supporting the International Legal Consultant, the Client and IFC in providing responses to bidders on questions and requests for clarification related to legal aspects;</li>\n\t<li>Attending pre-bid meetings, bidders conference together with the International Legal Consultant as required, and advising the Client and IFC generally in connection with this;</li>\n\t<li>In collaboration with the International Legal Consultant, assisting IFC with the support it provides to the Client in reviewing the bids (including review of any amendments and mark-ups to the RFP and the PPP agreements (and other documents) proposed by bidders, analysis of proposals of qualified bidders, reviewing the proposals for compliance with the RFP&rsquo;s terms, and from the perspective of the requirements of the local legislation, and drafting the legal sections of evaluation and selection reports);</li>\n\t<li>Advising the Client and IFC on an ongoing basis to ensure compliance with the applicable procurement and other laws and regulations of Uzbekistan throughout the bid process and advising on any legal aspects and issues that might arise, and</li>\n\t<li>Preparation of minutes of the tender commission meetings.</li>\n\t<li>Assisting the Client and IFC in negotiations of the PPP Agreement (and any other relevant agreements) with the winning bidder(s) until their execution, and overall support in addressing any legal or contractual issues that may arise between bid award, signature of the project agreements and financial close.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>III. MAIN DELIVERABLES, LANGUAGE AND INDICATIVE TIMELINE</p>\n\n<p>1. Overview of Deliverables</p>\n\n<p>The Local Legal Consultant will be expected to provide the main deliverables in accordance with the below timetable. This is indicative only and actual timelines will be mutually decided per the requirements of the Client.</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:654px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#cccccc; width:36.0pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:270.0pt\">\n\t\t\t<p><strong>Deliverables</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:184.5pt\">\n\t\t\t<p><strong>Target months from Notice to Proceed</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong>Phase I &ndash; Due Diligence and Transaction Structuring</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Draft legal due diligence report</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p>Month 2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>2.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Incorporation of comments from the International Legal Consultant as well as IFC, and preparation of the final due diligence report</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p>Two weeks from receipt of comments to the draft</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Inputs to relevant sections of the PAD and review the final set of documents that will be submitted to the Client (IFC will coordinate finalization of the PAD and the Project Concept)</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p>Month 3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong>Phase II &ndash; Legal Advisory Support During the Tender Process</strong></p>\n\n\t\t\t<p>~6-8 months from the end of Phase I</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Drafting the RFQ documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>Month 1 from Phase II kick off</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>5.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Input in the RFQ Evaluation Report, prequalification Q&amp;A</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>In accordance with the tender schedule</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Preparation, of the draft RFP and PPP Agreements, for review by International Legal Consultant</p>\n\n\t\t\t<p>Support the International Legal Consultant in finalizing these documents based on comments from the Client, IFC, bidders and the PPP Agency</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>Month 3 from Phase II kick off</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>7.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Support with bidders Q&amp;A related to legal aspects, participation in the bidders&rsquo; conference;</p>\n\n\t\t\t<p>Support the International Legal Consultant and IFC with the revision of the final set of Project Documents);</p>\n\n\t\t\t<p>Assistance to the IFC, the Client and the International Legal Consultant with evaluation of proposals, and support with the finalization of the bid evaluation report from the perspective of local legislation.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>In accordance with the tender timeline</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>2. Quality Control</p>\n\n<p>The Local Legal Consultant is required to produce a high-quality work product in accordance with best practice for law firms. This means, among other things:</p>\n\n<ol>\n\t<li>legal documents will be logically structured, clearly and economically drafted and in plain language;</li>\n\t<li>all deliverables will be checked for spelling, cross references, consistency, etc. before being issued to the International Legal Consultant, the Client and IFC, and again before being issued to the bidders;</li>\n\t<li>work in the legal team will be done at the appropriate level of seniority and experience, and the lead partner will at all times oversee and ensure the appropriateness and quality of all legal documentation and advice; and</li>\n\t<li>all deliverables are subject to review and approval by the Client and IFC and considered final upon such approvals. All deliverables should meet the requirements described in the section.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>3. Language</p>\n\n<p>Draft deliverables shall be logically structured, clearly and economically drafted and in plain English and Russian languages.&nbsp; All deliverables will first be drafted in English and once IFC is satisfied with the draft all documents, the Local Legal Consultant will need to translate these in Russian language for the GoU&rsquo;s approval processes.</p>\n\n<p>For the avoidance of doubt, the Local Legal Consultant will also provide for translation of those deliverables that are prepared by the International Legal Consultant. Specifically, the Local Legal Consultant will bear the primary responsibility for preparing the translation of the Project Documents into the Russian language and ensure that the translation is correct and consistent.</p>\n\n<p>&nbsp;</p>\n\n<p>IV. SCHEDULE OF PAYMENT</p>\n\n<p>The remuneration for the activities described in these Terms of Reference will be a lump sum, inclusive of all staff costs, printing, translation, communications, travel, accommodation and the like, and all other costs incurred by the Local Legal Consultant in carrying out the assignment as described above.&nbsp;</p>\n\n<p>Payments will be made in accordance with the following schedule:</p>\n\n<ul>\n\t<li>Submission of final legal due diligence report (20%)</li>\n\t<li>Submission of inputs to PAD related to legal sections (10%)</li>\n\t<li>Finalization of the prequalification process (10%)</li>\n\t<li>Approval of final set of Project Documents by the Client (20%)</li>\n\t<li>Evaluation of technical and financial bids (20%)</li>\n\t<li>Signing of the PPP Agreement (20%).</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>V. ASSUMPTIONS</p>\n\n<p>The Local Legal Consultant may make the following assumptions:</p>\n\n<p>&nbsp;</p>\n\n<p>1. Time</p>\n\n<p>Phase 1: Due Diligence and Transaction Structuring is expected to last between three to four months. There will likely be a period of several weeks during which the Client will be reviewing the PAD and making a decision.</p>\n\n<p>Phase 2: Implementation to Commercial Close is expected to last between six to eight months.</p>\n\n<p>The above timeline is indicative, the actual schedule will depend on the complexity of issues discovered during due diligence and the Client&rsquo;s decision-making process. As such, the Client may from time to time instruct the Local Legal Consultant to cease working, e.g., in case of delays in the Project schedule or periods when government decisions are required, whereupon these periods will be notionally suspended.</p>\n\n<p>&nbsp;</p>\n\n<p>2. Data and interviews</p>\n\n<p>The Local Legal Consultant will be required to collect the necessary data and information required for the legal due diligence including requesting data, confirmations, meetings and interviews with Government representatives as might be required.</p>\n\n<p>&nbsp;</p>\n\n<p>3. Specific Inputs to be Provided to the Local Legal Consultant</p>\n\n<p>Once the Local Legal Consultant&rsquo;s contract is effective, the Client and IFC will make available to the Local Legal Consultant all relevant documents, files, reports, governmental opinions and any other information that may be needed so that the employed staff members are fully aware of latest developments and needs of the Project. Such documentation may be in Russian and/or English translation.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>4. Other Assumptions</strong></p>\n\n<ul>\n\t<li>It is expected that the Local Legal Consultant&rsquo;s responsibilities will be focused on activities as set out under Phase 1. During Phase 2, the Local Legal Consultant will provide inputs to workstreams lead by the International Legal Consultant which will be primarily responsible for delivering the tasks under this phase. It is envisioned that the International Legal Consultant will take the lead in the discussions and activities related to legal aspects during Phase 2.</li>\n\t<li>The Local Legal Consultant will, under the supervision and support of the International Legal Consultant, prepare the initial drafts of the RFQ, RFP and the PPP Agreement and particularly ensure that these are compliant with local legal and regulatory requirements. The International Legal Consultant will finalize and will be fully responsible for the final versions of these Project Documents, including setting out of best-practice elements when required.</li>\n\t<li>Should there be a need to provide any legislative drafting for the Client in order to advance the Project (such as decrees, or other similar legislative documents), the number of such documents to be produced by the Local Legal Consultant will be limited to three.</li>\n\t<li>The Local Legal Consultant may require normal market input from other advisors (e.g. technical / financial / insurance) on issues falling within the customary mandate of such experts, to facilitate drafting of the contract and other project documents within the legal scope;</li>\n\t<li>This assignment has an inherently &ldquo;open&rdquo; nature and it is the responsibility of the Local Legal Consultant to be proactive and identify and execute any additional tasks that may be required in order to ensure the success of the Project. In case either IFC or the Client may need to request complementary analysis, the Local Legal Consultant will therefore have to be in a position to take on and complete any such complementary task.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>VI. LOCAL LEGAL CONSULTANT PROFILE AND QUALIFICATION REQUIREMENTS</p>\n\n<p>1. Functional Experience</p>\n\n<p>The Local Legal Consultant will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference. In particular, the Local Legal Consultant should demonstrate experience in:</p>\n\n<ul>\n\t<li>Providing legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector);</li>\n\t<li>Experience in providing the legal advice in investment projects in infrastructure and social sector in Uzbekistan in the past 10 years (preferably experience in healthcare sector);</li>\n</ul>\n\n<p>For the evaluation purpose the candidates should provide the information on experience and projects at least for 5, but no more than for 10 projects, by filling out the forms below:</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:512.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:24.15pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.9pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:89.85pt\">\n\t\t\t<p>Project start date (year, month mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:61.55pt\">\n\t\t\t<p>Project end date (year, month mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:68.3pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:63.8pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:63.8pt\">\n\t\t\t<p>Contracted Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:512.5pt\">\n\t\t\t<p>Experience in providing the legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector).&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>...</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:512.5pt\">\n\t\t\t<p>Experience in providing the legal advice in investment projects in infrastructure and social sector in Uzbekistan in the past 10 years (preferably experience in healthcare sector).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Detailed information on the projects mentioned in the form above.</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project start date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project end date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Interrupted/uninterrupted</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Source of financing</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>2. Key Professional Staff</p>\n\n<p>The team proposed by the Local Legal Consultant should, inter alia, include the following key specialists (the information below should be provided separately for each of the employee):</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:494.75pt\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#bfbfbf; width:95.1pt\">\n\t\t\t<p><strong>Position/expertise</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; width:399.65pt\">\n\t\t\t<p><strong>Qualification</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:95.1pt\">\n\t\t\t<p>Team Leader / Senior Partner/Partner</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:399.65pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Minimum ten years of overall professional experience;</li>\n\t\t\t\t<li>Experience in legal advice on investment projects in infrastructure facilities and the social sphere in the countries of the Central Asian region (mainly in Uzbekistan and in the field of healthcare);</li>\n\t\t\t\t<li>Experience in PPP projects in the countries of the Central Asian region (preferably in the health sector);</li>\n\t\t\t\t<li>Law degree in a reputable institution;</li>\n\t\t\t\t<li>Excellent English and Russian language skills (written and oral).</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:95.1pt\">\n\t\t\t<p>Team of Relevant Legal Associates</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:399.65pt\">\n\t\t\t<ul>\n\t\t\t\t<li>At least 5 years of relevant professional experience;</li>\n\t\t\t\t<li>Experience in advising on PPP transactions in the Central Asian region (preferably in healthcare sector);</li>\n\t\t\t\t<li>Experience in legal advice on investment projects in infrastructure facilities and the social sphere in the countries of the Central Asian region (mainly in Uzbekistan and in the field of healthcare);</li>\n\t\t\t\t<li>Law degree from a reputable institution;</li>\n\t\t\t\t<li>Excellent English as well as Russian language skills (written and oral) are required.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Potential proponents should note that the proposed team leader is expected to both serve as main point of contact with IFC as well as the Client, and to significantly contribute to the successful implementation of the assignment. It is further expected that the proposed team leader will remain the same person throughout the duration of the assignment.</p>"},{"id":"OP00136575","notice_type":"Request for Expression of Interest","noticedate":"08-Jul-2021","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2021-07-22T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P168180","project_name":"Institutional Capacity Building Project","bid_reference_no":"PPPDA-HOSPITAL-INTERNATIONALLEGAL-CS-CQS","bid_description":"Uzbekistan Hospital Consolidation Project International Legal Consultant","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"29, Istiklol str. Tashkent","contact_ctry_name":"Uzbekistan","contact_email":"piu_mof@mail.ru","contact_name":"Foziljon Kalandarov","contact_organization":"Project implementation Unit under Ministry of Finance of the Republic of Uzbekistan","contact_phone_no":"+998907380050","contact_web_url":"www.mf.uz","submission_date":"2021-07-08T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST<br />\n(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Uzbekistan </strong></p>\n\n<p><strong>Institutional Capacity Building Project </strong></p>\n\n<p>Credit No.: IDA 6431-UZ</p>\n\n<p><strong>Assignment Title:</strong><strong> Uzbekistan Hospital Consolidation Project International Legal Consultant</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>.: <strong>PPPDA-HOSPITAL-INTERNATIONALLEGAL-CS-CQS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Ministry of Finance of the Republic of Uzbekistan has received financing from the World Bank toward the cost of the Institutional Capacity Building Project and intends to apply part of the proceeds for consulting services on behalf of the PPPD Agency under the Ministry of Finance and the Ministry of Health of the Republic of Uzbekistan.</p>\n\n<p>The Consulting services (&ldquo;the Services&rdquo;) include provision of legal support during&nbsp; implementation of the multidisciplinary greenfield hospitals emergence Project in collaboration with the Local Legal Consultant. This support relates to all legal aspects of the PPP transaction, including review of the legal due diligence findings, support in the transaction structuring, preparation of tender documents, drafting the PPP agreement and/or other transaction documents, and support in conducting a fair and transparent tender process.</p>\n\n<p>Implementation period up to 12-24 months, ensuring full consistency with the Terms of Reference (TOR) attached in this REOI.</p>\n\n<p>The Ministry of Finance of the Republic of Uzbekistan now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services submitting directly to the piu_mof@mail.ru.</p>\n\n<p>The qualification requirements for the Consultants are:</p>\n\n<ul>\n\t<li>Providing legal advice and structuring PPP transactions in different countries in the past 10 years (preferably experience in Central Asia and healthcare sector);</li>\n\t<li>Providing legal advice for investment projects in infrastructure and social facilities in the Central Asia in the past 10 years (preferably in healthcare sector).</li>\n</ul>\n\n<p>The International Legal Consultant and the proposed team will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference.</p>\n\n<p>The attention of interested Consultants is drawn to Section III of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Ministry of Finance of the Republic of Uzbekistan.</p>\n\n<p>A Consultant will be selected in accordance with the Consultant Qualification Selection (CQS) method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours from 9:00 a.m. to 18:00 p.m. Tashkent time.</p>\n\n<p>Expressions of interest must be delivered in a written form in English, Russian or Uzbek languages to the address below (in person, or by mail, or by e-mail) by July 22nd 2021.</p>\n\n<p>&nbsp;</p>\n\n<p>Project Implementation Unit under the<br />\nMinistry of Finance of the Republic of Uzbekistan</p>\n\n<p>Attn: Foziljon Kalandarov, Manager of the Project</p>\n\n<p>Uzbekistan, 100017, Tashkent city, 29, Istiklol St.</p>\n\n<p>Tel: +998907380050</p>\n\n<p>E-mail: <em>piu_mof@mail.ru</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>As part of the EOI, the consultant should include the following information:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Consulting Firm Information</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:477.0pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Country of Incorporation:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Acronym:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>EOI Submission Authorized by:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:211.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Associations (Joint Venture or Sub-consultancy)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:476.6pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.5pt; width:76.0pt\">\n\t\t\t<p>Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:59.95pt\">\n\t\t\t<p>Acronym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:88.65pt\">\n\t\t\t<p>Country of Incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:76.5pt\">\n\t\t\t<p>Joint Venture (JV) or Sub-consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>EOI Submission Authorized By</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:85.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Present the rationale for and benefits of working in association (JV or Sub-consultant) with others rather than undertaking the assignment independently (as appropriate). Describe the proposed management and coordination approach of the association and the role of each firm</em>.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Technical competence </strong></li>\n</ul>\n\n<p><em>Project References - highlight the technical qualifications of your entity/consortium in undertaking similar assignments. Provide details of past experiences working with similar project authorities</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Geographical experience </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Project References, present experiences in similar geographic areas.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Management Competence </strong></li>\n</ul>\n\n<ul>\n\t<li>Describe standard policies, procedures, and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.</li>\n\t<li>How your firm/consortium handles complaints concerning the performance of experts or quality of the reports submitted for previous and future assignments? What internal controls are in place to address and resolve complaints.</li>\n\t<li>How you ensure the quality of your firm&rsquo;s/consortium&rsquo;s performance over the life of assignments.</li>\n</ul>\n\n<ul>\n\t<li><strong>Projects references </strong></li>\n</ul>\n\n<p>Present relevant projects to demonstrate the firm&rsquo;s technical qualifications and geographical experience (at least for 5 but no more than 10 projects).</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:484.15pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:30.05pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:74.15pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:3.0cm\">\n\t\t\t<p>Project start date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:71.9pt\">\n\t\t\t<p>Project end date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:50.6pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.65pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice and structuring PPP transactions in different countries in the past 10 years (preferably experience in Central Asia and healthcare sector).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; vertical-align:bottom; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice in investment projects in infrastructure and social facilities in the Central Asia in the past 10 years. (preferably in healthcare)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Summary for the Projects listed above</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Eligibility </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>We, the undersigned, certify to the best of our knowledge and belief:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We have read the advertisement, including the terms of reference (TOR), for this assignment (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the TOR for this activity (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>We confirm that the project references submitted as part of this EOI accurately reflect the experience of the specified firm/consortium. (YES/NO)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Ensuing assignment resulting from our work product under this assignment, our firm, JV member or sub-consultant, and the expert(s) will be disqualified from short-listing and participation in the assignment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>The lead entity and JV member or sub-consultant are NOT currently sanctioned by or other MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Draft Terms of Reference for Activity</strong></p>\n\n<p><strong>Uzbekistan Hospital Consolidation Project</strong></p>\n\n<p><strong>International Legal Consultant</strong></p>\n\n<p>I. PROJECT BACKGROUND</p>\n\n<p><strong><em>Introduction</em></strong></p>\n\n<p>Healthcare is one of the priority sectors for the Government of Uzbekistan (GoU) in its plans for improving public services. Currently, care provision is predominantly based on a network of small, public mono-profile hospitals that treat separate disease categories and population groups (e.g., neurological and psychiatric hospitals, cardiology and emergency hospitals). At the same time, lack of investment in requisite infrastructure and equipment has led to many of these facilities being in need of major rehabilitation or new construction, and only very few being able to provide complex medical care in line with international best practice.</p>\n\n<p>The GoU through the Ministry of Health (MOH) and the Public - Private Partnership Development Agency under the Ministry of Finance (MOF) is therefore &ndash; and especially against the backdrop of the COVID-19 crisis &ndash; vested in upgrading the country&rsquo;s hospital capacity to improve the efficiency, safety and quality of services provided. In particular, the objective is to transform the present network of mono-profile hospitals by consolidating them into contemporary multi-profile facilities which would allow for treatment of patients facing multiple conditions. The underlying objective is both to optimize public sector spending and to attract private investments in Uzbekistan&rsquo;s health sector to help create modern hospital infrastructure and introduce quality facility management.</p>\n\n<p>1. Project Description</p>\n\n<p>To pilot the above-noted plans, the MoH and the PPPD Agency under the MOF (together - the Client) envisage to combine several outdated mono-profile public hospitals in a pilot region into a new multidisciplinary greenfield hospital with the help of a competitively selected private investor under a public-private partnership (PPP) model (the Project). As such, the Project will be structured as a Private Finance Initiative (PFI), whereby the private partner is expected to design, build, finance and maintain the respective hospital, while the public partner continues to be responsible for the provision of all clinical services. Expected investments in the Project will be confirmed during project preparation. While the PFI model is contemplated under Uzbekistan&rsquo;s PPP law of 2019, the Project would be the first hospital PFI in the country where hospitals are prevalently owned by the MoH.</p>\n\n<p>By choosing a PPP structure, the GoU specifically expects (i) to benefit from the expertise of specialized companies in implementing best-practice as regards high-quality hospital design that leads to improved clinical workflows and efficiency gains in maintenance and management services; (ii) to ensure on time and within budget delivery; (iii) to benefit from potential technical innovations; and (iv) to access much needed private financing for further development of the country&rsquo;s healthcare sector.</p>\n\n<p>In this context and making use of a World Bank loan earmarked for funding of PPP preparation activities across all sectors, the GoU wishes to appoint an international law firm (the International Legal Consultant), to provide legal support during the implementation of the Project. This support relates to all legal aspects of the PPP transaction, including review of the legal due diligence findings, support in the transaction structuring, preparation of tender documents, drafting the PPP agreement and/or other transaction documents, and support in conducting a fair and transparent tender process.</p>\n\n<p>The International Legal Consultant will be asked to work closely and in collaboration with the local Uzbekistan legal consultant (Local Legal Consultant) who will be appointed by the Client separately (see the Terms of Reference included under Annex 1).</p>\n\n<p>The International Legal Consultant, as well as the Local Legal Consultant, will work under the coordination and supervision of both the Client and IFC and will report to the IFC team on all the aspects and deliverables of this assignment. The International Legal Consultant will equally liaise and collaborate with the technical consultants under the Project as well as any other consultants that IFC as the lead transaction advisor recruits. In delivering its services, the International Legal Consultant is expected to follow the below phased approach according to which IFC&rsquo;s advisory services will be structured.</p>\n\n<p>&nbsp;</p>\n\n<p>2. Project Phases</p>\n\n<p>The Project will be implemented in three phases:</p>\n\n<ul>\n\t<li>Phase 0 &ndash; preliminary assessment - will entail the selection of the priority region, a needs assessment and the identification of specific mono-profile outdated facilities which will form the new hospital.</li>\n</ul>\n\n<p>This phase is expected to be completed by the time of the International Legal Consultant&rsquo;s appointment and does hence not form part of the expected scope of work (as detailed below).</p>\n\n<ul>\n\t<li>Phase 1 &ndash; due diligence, and Phase 2 &ndash; tender process as described further in the TORs.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The duration of each phase may be affected as a result of decisions that the Client or IFC may make from time to time in connection with the Project. The Client and IFC may also instruct (in written form) the International Legal Consultant to suspend work during any delay period.</p>\n\n<p>&nbsp;</p>\n\n<p>II. SCOPE OF WORK</p>\n\n<p>It is expected that the International Legal Consultant&rsquo;s responsibilities will be focused on activities as set out under Phase 2 during which it will work together with the Local Legal Consultant and be supported by the him as described below. In Phase 1, the International Legal Consultant will assist IFC in the analysis of available structuring options for the Project based on the findings of the legal due diligence report prepared by the Local Legal Consultant. Details of the relevant scope of works are explained in the following sections.</p>\n\n<p>&nbsp;</p>\n\n<p>Phase 1 &ndash; Due Diligence and Transaction Structuring</p>\n\n<p>1. Review of the Legal Due Diligence Findings</p>\n\n<p>The International Legal Consultant will be required to review the legal due diligence report prepared by the Local Legal Consultant. This will include commenting on, and in collaboration with the Local Legal Consultant, proposing potential solutions for any issues or concerns identified in relation to the legal, institutional, and regulatory framework relevant to Uzbekistan&rsquo;s health sector and hospital services. Particular attention will need to be paid to any domestic legislation concerning the construction, operation and maintenance of hospital facilities as well as the carrying out of ancillary services that may impact the Project.</p>\n\n<p>It is envisioned that the legal due diligence report will include the following:</p>\n\n<ol>\n\t<li>an executive summary of all material issues and risks identified in the report and the recommendations on how to address them;</li>\n\t<li>a summary of all applicable findings (including laws, contractual provisions, permits, etc. as set out above) in a level of detail appropriate for the Project and the intended audience;</li>\n\t<li>a risk matrix that identifies material risks during the construction and operational phases, suggests allocation of these risks as well as mitigation measures while pointing out any legal issues, uncertainties or potential liabilities which the Client should understand, consider and approve;</li>\n\t<li>a road map for implementation of the Project, including all legal steps needed to complete the Project. Summarize the legal requirements and prerequisites for a contract award in terms of due process to be followed and approvals/ clearances to be obtained by relevant authorities, prior to bid award.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>2. Structuring Analysis</p>\n\n<p>Based on the findings in the due diligence report prepared by the Local Legal Consultant, the latter and the International Legal Consultant with international experience will assist IFC in its analysis of available structuring options and in framing recommendations to the Client, including analysis and recommendations on the allocation of legal, regulatory, commercial and other risks for the Project, and benchmarking against other similar projects. Tasks under the structuring analysis include:</p>\n\n<ol>\n\t<li>Review the transaction structure for the Project as proposed by the IFC team.</li>\n\t<li>Comment on any risks related to the proposed transaction structure from the perspective of international good practice;</li>\n\t<li>Draft a brief term sheet outlining the key terms and conditions that will ensure the Project&rsquo;s bankability;</li>\n\t<li>In collaboration with the technical consultants and the Local Legal Consultant, summarize available structuring options for the Project, together with analysis of the extent to which risks apply to each and to which extent the above bankability terms are met by each option. In relation to structuring options and comments on risk allocation, comparisons/benchmarking of structures and risk allocations used in similar projects should be indicated.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>3. Promoting the Project</p>\n\n<p>The International Legal Consultant, together with the Local Legal Consultant, will support the Client and IFC in follow-up consultations, including with other stakeholders, to assist them to reach a decision on whether and how to proceed further with the Project. Specifically, the International Legal Consultant, together with the Local Legal Consultant, will assist the Client and IFC with the legal aspects of the marketing effort to potential investors (lenders and sponsors) by replying to written questions and participating in conference calls or meetings.</p>\n\n<p>If the Client approves the Project to proceed to tendering stage, the International Legal Consultant will then undertake works as outlined under Phase 2.</p>\n\n<p>&nbsp;</p>\n\n<p>Phase 2 &ndash; Implementation</p>\n\n<p>4. Bid Process</p>\n\n<p>As noted under Section I, the Project will be tendered through an independent bid process. In close collaboration with the Local Legal Consultant and the technical consultants, the International Legal Consultant will lead the discussions and activities related to legal aspects during Phase 2 and will support the Client and IFC in designing and implementing this process, including:</p>\n\n<ol>\n\t<li>Lead the preparation of the Project Documents. It is expected that the Local Legal Consultant will prepare the initial drafts of the Request for Qualification (RFQ), Request for Proposal (RFP), the draft PPP Agreement (Project Documents) and any other agreements required for the Project in compliance with procurement laws and regulations (e.g. land lease, corporate guarantee, etc.). and the International Legal Consultant will review, add the best-practice elements when required and finalize for review by the Client and IFC for inclusion in the Tender package issued to bidders. The number and nature of the Project Documents will depend on the transaction structure chosen by the Client as a result of the Phase 1 work.</li>\n</ol>\n\n<p>In drafting the initial drafts of Tender Documents, the Local Legal Consultant will ensure their compliance with domestic legal and the regulatory requirements and the International Legal Consultant will ensure that these documents are in line with international best-practice for similar tenders. The International Legal Consultant will be fully responsible for the final versions of the Tender Documents and their overall quality.</p>\n\n<ol>\n\t<li>Finalizing evaluation criteria, which will constitute the basis for the RFQ evaluation report, assessing the applications against the pre-qualification criteria;</li>\n\t<li>Reviewing relevant legal sections to the project marketing documents, such as information memorandums, project presentations and other materials to be delivered to the Client and to bidders;</li>\n\t<li>Providing responses to bidders on all questions and requests for clarification with primary responsibility for questions related to legal matters, in close collaboration and input from the Local Legal Consultant, within the timeframes set by the Tender documents;</li>\n\t<li>Attending pre-bid meetings, bidders conference as required and advising the Client and IFC generally in connection with this;</li>\n\t<li>Assisting IFC with the support it provides to the Client in reviewing the bids (including analysis of any amendments and mark-ups to the RFP and the PPP Agreement (and other documents) proposed by bidders, analysis of proposals of qualified bidders, reviewing the proposals for compliance with the RFP&rsquo;s terms);</li>\n\t<li>Generally advising the Client and IFC, in collaboration and with input of the Local Legal Consultant, on an ongoing basis to ensure compliance with the applicable procurement and other laws and regulations throughout the bid process and advising on any issues that might arise, and</li>\n\t<li>Assisting the Client and IFC in negotiations of the PPP Agreement (and any other relevant agreements) with the winning bidder(s) until their execution ,and overall support in addressing any legal or contractual issues that may arise between bid award, signature of the project agreements and financial close</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>5. Virtual Dataroom</p>\n\n<ol>\n\t<li>The International Legal Consultant will procure, setup, administer and manage a VDR platform (the Platform). The Platform is expected to be active from the announcement of the RFQ and until the end of the tender, which is expected to last between six to eight months, although the International Legal Consultant should price for 12 months in case of delays in the project. The International Legal Consultant is expected to be responsible for ensuring the proper upload of documents to the Platform, estimated to be under 10,000 pages, and be available to support queries from the IFC as well as the Client on the services provided by the Platform for two hours per week.</li>\n\t<li>The International Legal Consultant will be responsible for monitoring the Platform and supervising the Platform Provider to ensure the efficacy, integrity, performance and functioning of all aspects related to the Platform and to prevent that the Platform is improperly accessed or the information therein is improperly disclosed;</li>\n\t<li>The International Legal Consultant shall be responsible for liaising and interacting with representatives of the Clients and IFC in all matters pertaining to data requests, data management, security, interaction with third parties, etc.</li>\n\t<li>The general features expected of the Platform and the responsibilities of the International Legal Consultant and the Platform Provider in relation thereto, include but are not limited to:</li>\n</ol>\n\n<ol>\n\t<li>Uploading and data management (e.g. documents, folders, etc.) of the transaction and implementing file access controls by user type as well as proper file management to avoid malicious file uploads. Systems shall allow processing of all standard size documents.</li>\n\t<li>Access and permissions management to a prespecified number of users; access sharing to transaction specific information posted on the Platform with investors individually or as a whole group or as sub-groups.</li>\n\t<li>Managing communication with bidders individually or as a whole group or as sub-groups through emails generated by the platform, including option of activating a Q&amp;A function, if required.</li>\n\t<li>Maintenance of an audit log of all user activity (e.g. messages received/sent, status updates, comments, feedback, documents opened, user logins, etc.).</li>\n\t<li>Archive transactions as-is (soft version through data file as well as storage device copies at the end of the project within 48-hour period of project completion).</li>\n\t<li>Drafting procedures governing use of the data room, as well as appropriate confidentiality undertakings.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>III. MAIN DELIVERABLES, LANGUAGE AND INDICATIVE TIMELINE</p>\n\n<p>1. Overview of Deliverables</p>\n\n<p>The International Legal Consultant will be expected to provide the main deliverables in accordance with the below timetable. This is indicative only and actual timelines will be mutually decided per the requirements of the Client.</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:654px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#cccccc; width:36.0pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:270.0pt\">\n\t\t\t<p><strong>Deliverables</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:184.5pt\">\n\t\t\t<p><strong>Target months from Notice to Proceed</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong>Phase I &ndash; Due Diligence and Transaction Structuring</strong></p>\n\n\t\t\t<p><em>~2-3 months from written notification about the start of Phase 1</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Review and comment on the legal due diligence report</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p>Month 2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Input in the transaction structuring activities as specified under Task 1. Review the transaction structuring presentation that will be prepared by the IFC and will be submitted to the Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p>Month 3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong>Phase II &ndash; Implementation</strong></p>\n\n\t\t\t<p><em>~6-8 months from the end of Phase I</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Finalization of the RFQ documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>Month 1 from Phase II kick off</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Set up VDR Platform</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>At the launch of the RFQ</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>5.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Review the RFQ Evaluation Report, support in the prequalification Q&amp;A</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>In accordance with the tender schedule</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>In collaboration with the Local Legal Consultant, drafting of the RFP and PPP Agreement</p>\n\n\t\t\t<p>Finalization of the tender documents (RFP and PPP Agreement) based on comments from the Client, IFC, bidders and the PPP Agency</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>Month 3 from Phase II kick off</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p>7.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p>Support with bidders Q&amp;A on legal matters</p>\n\n\t\t\t<p>Participation in bidders&rsquo; conference</p>\n\n\t\t\t<p>Based on the results of the bidders&rsquo; conference, revision of final set of tender documents, assistance with evaluation of proposals</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p>In accordance with the tender timeline</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>It is expected that the International Legal Consultant will provide the main documents in accordance with the abovementioned timeline. The timeline is tentative and actual deadlines will be determined by the Client.&nbsp;</p>\n\n<p>2. Quality Control</p>\n\n<p>The International Legal Consultant is required to produce a high-quality work product in accordance with best practice for law firms. This means, among other things:</p>\n\n<ol>\n\t<li>legal documents will be logically structured, clearly and economically drafted and in plain language;</li>\n\t<li>all deliverables will be checked for spelling, cross references, consistency, etc. before being issued to the Client and IFC, and again before being issued to the bidders;</li>\n\t<li>work in the legal team will be done at the appropriate level of seniority and experience, and the lead partner will at all times oversee and ensure the appropriateness and quality of all legal documentation and advice; and</li>\n\t<li>all deliverables are subject to review and approval by the Client and IFC and considered final upon such approvals. All deliverables should meet the requirements described in this section.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>3. Language</p>\n\n<p>Draft deliverables shall be logically structured, clearly and economically drafted and in plain English. In this regard, the process envisaged is that all legal deliverables will be drafted in English and once IFC is satisfied with these drafts, the Local Legal Consultant will carry out the respective translations to Russian language for the GoU&rsquo;s approval processes.</p>\n\n<p>During the tender, discussions and negotiations are expected to take place in English.</p>\n\n<p>&nbsp;</p>\n\n<p>IV. SCHEDULE OF PAYMENT</p>\n\n<p>The remuneration for the activities described in these Terms of Reference will be a lump sum, inclusive of all staff costs, printing, communications, travel, accommodation and the like, and all other costs incurred by the International Legal Consultant in carrying out the assignment as described above.&nbsp;</p>\n\n<p>Payments will be made in accordance with the following schedule:</p>\n\n<ul>\n\t<li>Review of the legal due diligence and finalization of the transaction structuring process (10%)</li>\n\t<li>Finalization of the prequalification process (20%)</li>\n\t<li>Approval of final set of RFP and PPP Agreement by the Client and launch of the RFP (30%)</li>\n\t<li>Evaluation of technical and financial bids (20%)</li>\n\t<li>Signing of the PPP Agreement (20%)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>V. ASSUMPTIONS</p>\n\n<p>The International Legal Consultant may make the following assumptions:</p>\n\n<p>&nbsp;</p>\n\n<p>1. Time</p>\n\n<p>Phase 1: Due Diligence and Transaction Structuring is expected to last between three to four months. There will likely be a period of several weeks during which the Client will be reviewing the relevant documentation and making a decision.</p>\n\n<p>Phase 2: Implementation to Commercial Close is expected to last between six to eight months.</p>\n\n<p>The above timeline is indicative, the actual schedule will depend on the complexity of issues discovered during due diligence and the Client&rsquo;s decision-making process. As such, the Client may from time to time instruct (in written form) the International Legal Consultant to cease working, e.g., in case of delays in the Project schedule or periods when government decisions are required, whereupon these periods will be notionally suspended.</p>\n\n<p>&nbsp;</p>\n\n<p>2. Data and interviews</p>\n\n<p>Meetings with Client representatives and stakeholders will take place virtually. Except for personal interviews, all assessment will be based on publicly available data (acceptable to the Client and IFC) and data supplied by the Client.</p>\n\n<p>Travel to Tashkent will be organized only in case travel is deemed safe and acceptable by the World Bank Group and GoU travel policy related to the COVID-19 pandemic. In case that the travel should be allowed, both by the World Bank Group, the GoU and the International Legal Consultant&rsquo;s own policy, two trips to Uzbekistan should be planned by the International Legal Consultant during Phase 2.</p>\n\n<p>&nbsp;</p>\n\n<p>3. Specific Inputs to be Provided to the Consultant</p>\n\n<p>Once the International Legal Consultant&rsquo;s contract is effective, the Client and IFC will make available to the International Legal Consultant all relevant documents, files, reports, governmental opinions and any other information that may be needed so that the employed staff members are fully aware of latest developments and needs of the Project.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>4. Other Assumptions</strong></p>\n\n<ul>\n\t<li>It is envisioned that while the Local Legal Consultant and the International Legal Consultant are procured separately, both are expected to collaborate closely;</li>\n\t<li>It is envisioned that the legal due diligence tasks under Phase 1 will be primarily led by the Local Legal Consultant and the International Legal Consultant will lead the activities and discussions related to all legal aspects pertaining to tasks under Phase 2. The Local Legal Consultant will prepare the initial drafts tender documents, such as the RFQ, RFP and the PPP Agreement which will then be finalized by the International Legal Consultant in compliance with best industry practice and submitted to the Client and IFC. The International Legal Consultant will be fully responsible for the final product of tender documents and the overall quality of these documents.</li>\n\t<li>The International Legal Consultant will not be expected to provide any training to IFC or the Client.</li>\n\t<li>The International Legal Consultant will not be expected to provide any legislative drafting for the GoU.</li>\n\t<li>This assignment has an inherently &ldquo;open&rdquo; nature and it is the responsibility of the International Legal Consultant to be proactive and identify and execute any additional tasks that may be required in order to ensure the success of the Project. In case either IFC or the Client may need to request complementary analysis, the International Legal Consultant will therefore have to be in a position to take on and complete any such complementary task.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>VI. CONSULTANT PROFILE AND QUALIFICATION REQUIREMENTS</p>\n\n<p>1. Functional Experience</p>\n\n<p>The International Legal Consultant will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference. In particular, the Consultant should demonstrate experience in:</p>\n\n<ul>\n\t<li>Providing legal advice and structuring PPP transactions in different countries in the past 10 years (preferably experience in Central Asia and healthcare sector);</li>\n\t<li>Providing legal advice for investment projects in infrastructure and social facilities in the Central Asia in the past 10 years (preferably in healthcare sector);</li>\n</ul>\n\n<p>For the evaluation purpose the candidates should provide the information on experience and projects at least for 5, but no more than for 10 projects, by filling out the forms below:</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:484.15pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:30.05pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:74.15pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:3.0cm\">\n\t\t\t<p>Project start date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:71.9pt\">\n\t\t\t<p>Project end date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:50.6pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.65pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice and structuring PPP transactions in different countries in the past 10 years (preferably experience in Central Asia and healthcare sector).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; vertical-align:bottom; width:484.15pt\">\n\t\t\t<p>Experience in providing the legal advice in investment projects in infrastructure and social facilities in the Central Asia in the past 10 years. (preferably in healthcare)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Detailed information on the projects mentioned in the form above.</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>ANNEX 1</em></strong><strong><em> </em></strong></p>\n\n<p><strong><em>Uzbekistan Hospital Consolidation Project</em></strong></p>\n\n<p><strong><em>Terms of Reference - Local Legal Consultant</em></strong></p>\n\n<p>&nbsp;</p>\n\n<p><em>I. PROJECT BACKGROUND</em></p>\n\n<p><strong><em>Introduction</em></strong></p>\n\n<p><em>Healthcare is one of the priority sectors for the Government of Uzbekistan (GoU) in its plans for improving public services. Currently, care provision is predominantly based on a network of small, public mono-profile hospitals that treat separate disease categories and population groups (e.g., neurological and psychiatric hospitals, cardiology and emergency hospitals). At the same time, lack of investment in requisite infrastructure and equipment has led to many of these facilities being in need of major rehabilitation or new construction, and only very few being able to provide complex medical care in line with international best practice</em></p>\n\n<p><em>The GoU through the Ministry of Health (MoH) and the Ministry of Finance (MoF) is therefore &ndash; and especially against the backdrop of the COVID-19 crisis &ndash; vested in upgrading the country&rsquo;s hospital capacity to improve the efficiency, safety and quality of services provided. In particular, the MoH is focused on transforming the present network of mono-profile hospitals by consolidating them into contemporary multi-profile facilities which would allow for treatment of patients facing multiple conditions. The underlying objective is both to optimize public sector spending and to attract private investments in Uzbekistan&rsquo;s health sector to help create modern hospital infrastructure and introduce quality facility management.</em></p>\n\n<p><em>1. Project Description</em></p>\n\n<p><em>To pilot the above-noted plans, the Ministry of Health (MoH) and the Ministry of Finance (MoF) (together - the Client) envisages to combine several outdated mono-profile public hospitals in a pilot region into a new multidisciplinary greenfield hospital with the help of a competitively selected private investor under a public-private partnership (PPP) model (the Project). As such, the Project will be structured as a Private Finance Initiative (PFI), whereby the private partner is expected to design, build, finance and maintain the respective hospital, while the public partner continues to be responsible for the provision of all clinical services. Expected Project size will be confirmed during project preparation. While the PFI model is contemplated under Uzbekistan&rsquo;s PPP law of 2019, the Project would be the first hospital PFI in the country where hospitals are prevalently owned by the MoH. </em></p>\n\n<p><em>By choosing a PPP structure, the GoU specifically expects (i) to benefit from the expertise of specialized companies in implementing best-practice as regards high-quality hospital design that leads to improved clinical workflows and efficiency gains in maintenance and management services; (ii) to ensure on time and within budget delivery; (iii) to benefit from potential technical innovations; and (iv) to access much needed private financing for further development of the country&rsquo;s healthcare sector. </em></p>\n\n<p><em>In this context and making use of a World Bank loan earmarked for funding of PPP preparation activities across all sectors, the GoU wishes to appoint a local law firm (the Local Legal Consultant), to provide legal support during the implementation of the Project. </em></p>\n\n<p><em>The support of the Local Legal Consultant will relate to all legal aspects of the PPP transaction with a focus on local legislation, including legal due diligence, support to the preparation of tender documents and the PPP agreement and/or other legal documents, and legal support in conducting a fair and transparent tender process, as specified further in these Terms of Reference.</em></p>\n\n<p><em>An international law firm (the International Legal Consultant) will be appointed separately (see the Terms of Reference included under Annex 1). The Local Legal Consultant will work jointly and in close collaboration with the International Legal Consultant to support the IFC and the GoU in implementing the Project. </em></p>\n\n<p><em>The Local Legal Consultant will work under the coordination and supervision of both the Client and IFC and will report to the IFC team on all the aspects and deliverables of this assignment.</em><em> T</em><em>he Local Legal Consultant will equally liaise and collaborate with the technical consultants under the Project as well as any other consultants that IFC as the lead transaction advisor recruits. In delivering its services, the Local Legal Consultant is expected to follow the below phased approach according to which IFC&rsquo;s advisory services will be structured. </em></p>\n\n<p>&nbsp;</p>\n\n<p><em>2. Project Phases</em></p>\n\n<ul>\n\t<li><em>Phase 0 &ndash; preliminary assessment &ndash; it is expected that the exercise will take up to 4 months which will entail the selection of the priority region, a needs assessment for the, including identification of specific mono-profile outdated facilities to consolidate and determine optimal capacity or the new hospital. </em></li>\n</ul>\n\n<p><em>This phase is expected to be completed at the time of the Consultant&rsquo;s appointment and does hence not form part of the expected scope of work (as detailed below).</em></p>\n\n<ul>\n\t<li><em>Phase 1 &ndash; due diligence, and Phase 2 &ndash;&nbsp; tender process, as described further in the TORs.</em></li>\n</ul>\n\n<p><em>The duration of each phase may be affected as a result of decisions that the Client or IFC may make from time to time in connection with the Project. The Client and IFC may also instruct the Local Legal Consultant to suspend work during any delay period.</em></p>\n\n<p>&nbsp;</p>\n\n<p><em>II. SCOPE OF WORK</em></p>\n\n<p><em>Phase 1 &ndash; Due Diligence and Transaction Structuring</em></p>\n\n<p><em>1. </em><em>Legal Due Diligence </em></p>\n\n<p><em>The Local Legal Consultant will conduct legal due diligence, to be submitted to the IFC and the International Legal Consultant, to identify all legal issues relevant to the successful implementation of the Project and will prepare a detailed due diligence report setting these out. </em></p>\n\n<p><em>Without limitation, the due diligence report must include the following: </em></p>\n\n<ol>\n\t<li><em>Taking note of relevant findings of Phase 0 analysis, describe and comment on the legal framework for procuring private sector participation and the tendering process (including review of existing and proposed PPP and procurement policies, laws and regulations), list of documents required for preparation and implementing a PPP project, as well as relevant approvals that will be needed in this respect;</em></li>\n\t<li><em>Describe the legal, institutional, and regulatory framework relevant to Uzbekistan&#39;s health sector, including applicable legislation and relevant regulators or stakeholders.&nbsp; This includes laws and regulations related to the construction, operation and maintenance of hospitals and legislation related to hospital operations and ancillary services.&nbsp; The analysis should identify any legal, regulatory and/or institutional issues that may impact the Project and propose solutions;</em></li>\n\t<li><em>Identify relevant aspects of public finance legislation and processes, including, among others, the social security system, taking into account </em><em>timing and process for budgets and payment for services;</em></li>\n\t<li><em>Provide legal assurance that the technical recommendations are within the scope of specific regulations or guidance issued by government bodies or recognized international health organizations;</em></li>\n\t<li><em>Identify any potential land issues, including any implications for construction of hospitals, and advise both generally and specifically in relation to any rights of way or other land related authorizations;</em></li>\n\t<li><em>Describe any legal and regulatory, licensing, customs, hospital specific accreditation issues that may impact a foreign and/or domestic private sector party&rsquo;s ability to implement the Project. Specifically analyse the possibility and conditions for foreign health professionals to practice in the country;</em></li>\n\t<li><em>Suggest possible changes to existing legal or regulatory frameworks concerning use of the PFI model for health projects which may be considered by the Client to allow for increased participation of private sector companies; </em></li>\n\t<li><em>Identify any </em><em>approvals, licenses and authorisations that are required for the Project, including those related to environmental, social, labor, health and safety aspects, and prepare an analysis of the timing and procedure required for such approvals;</em></li>\n\t<li><em>Review and comment on any existing contracts, agreements, titles, relevant to the MoH and other relevant bodies or stakeholders or party, which may affect the Project. For the avoidance of doubt, this review should include any (previous or existing) lease titles to the proposed sites to ensure that these do neither present an obstacle to the proposed arrangement nor imply any potential liabilities for either the Client or the successful bidder.</em></li>\n\t<li><em>Identify and make recommendations in relation to potential environmental and social issues; labor issues; competition issues applicable to the Project;</em></li>\n\t<li><em>Identify types of taxes, exemptions and benefits that may be applicable to the Project; </em></li>\n</ol>\n\n<p><em>The Local Legal Consultant will also be expected to: </em></p>\n\n<ol>\n\t<li><em>Develop, with IFC, security arrangements that could be utilized or are likely to be required for the transaction; and</em></li>\n\t<li><em>Participate, with IFC</em><em>, in discussions on the structure of the transaction.</em></li>\n\t<li>&nbsp;</li>\n</ol>\n\n<p><em>In formalizing the legal due diligence report, the Local Legal Consultant is to include the following: </em></p>\n\n<ol>\n\t<li><em>an executive summary of all material issues and risks identified in the report and the recommendations on how to address them;</em></li>\n\t<li><em>a summary of all applicable findings (including laws, contractual provisions, permits, etc. as set out above) in a level of detail appropriate for the Project and the intended audience;</em></li>\n\t<li><em>a risk matrix that identifies material risks during the construction and operational phases, suggests allocation of these risks as well as mitigation measures while pointing out any legal issues, uncertainties or potential liabilities which the Client should understand, consider and approve;</em></li>\n\t<li><em>a road map for implementation of the PPP Project, including all legal steps needed to complete the Project. Summarize the legal requirements and prerequisites for a contract award in terms of due process to be followed and approvals/ clearances to be obtained by relevant authorities, prior to bid award.</em></li>\n</ol>\n\n<p><em>Based on the results of the above analysis, the Local Legal Consultant in collaboration with the International Legal Consultant, will be required to provide inputs to an executive summary Project presentation as well as to relevant legal sections of the Project Assessment Document (PAD) and the Project Concept, both of which are required documents under Uzbek PPP legislation. The final version of the legal due diligence report, in which the Local Legal Consultant will have incorporated inputs from both the IFC, the International Legal Consultant and the Client following their review, is to be annexed to the PAD. The structure of the PAD (unofficial translation from the Uzbek language for reference only) is provided in Annex 2. In case of legislative changes as regards the drafting requirements or the PAD and/or the Project Concept, or introduction of other documents for preparation and implementation of PPP projects, the Local Legal Consultant is expected to provide support and modifications. IFC will be responsible for preparation of the PAD and Project Concept. </em></p>\n\n<p><em>2. Structuring Analysis</em></p>\n\n<p><em>Based on the findings in the due diligence report, the Local Legal Consultant and the International Legal Consultant, will assist IFC in its analysis of available structuring options and in framing recommendations to the Client, including analysis and recommendations on the allocation of legal, regulatory, and other risks for the Project, and benchmarking against other similar projects. Tasks under the structuring analysis include:</em></p>\n\n<ol>\n\t<li><em>Review and comment on the transaction structure for the Project as proposed by the IFC team and any risks related to the proposed transaction structure from the perspective of local legislation and practice; </em></li>\n\t<li><em>Support the International Legal Consultant in relation to local legislative matters in drafting a brief term sheet outlining the key terms and conditions that will ensure the Project&rsquo;s bankability; and </em></li>\n\t<li><em>Support the International Legal Consultant and IFC in relation to local legislation in summarizing available structuring options for the Project, together with analysis of the extent to which the above risks apply to each and to which extent the above bankability terms are met by each option;</em></li>\n\t<li><em>Assist the Client and IFC with providing inputs to or preparing any additional legal documents that may be required to obtain approvals as stipulated under Uzbekistan&rsquo;s PPP legislation to advance the Project to tender stage.</em></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>3. Promoting the Project</em></p>\n\n<p><em>The Local Legal Consultant, together with the International Legal Consultant, will support the Client and IFC in follow-up consultations, including with other stakeholders, to assist them to reach a decision on whether and how to proceed further with the Project. Specifically, the Local Legal Consultant, together with the International Legal Consultant, will assist the Client and IFC with the legal aspects of the marketing effort to potential investors (lenders and sponsors) by replying to written questions, and participating in conference calls or meetings.</em></p>\n\n<p><em>If the Client approves the Project to proceed to tendering stage, the Local Legal Consultant will then support the International Legal Consultant and IFC as outlined under Phase 2. </em></p>\n\n<p>&nbsp;</p>\n\n<p><em>Phase 2 &ndash; Legal Advisory Support During Tender Process</em></p>\n\n<p><em>4. Bid Process</em></p>\n\n<p><em>As noted under Section I, the Project will be tendered through an independent bid process. The Local Legal Consultant will be required to work in close collaboration with the International Legal Consultant to support the Client and IFC in the tender process.</em></p>\n\n<p>&nbsp;</p>\n\n<p><em>Specific tasks of the Local Legal Consultant during Phase 2 will include the following: </em></p>\n\n<ol>\n\t<li><em>Preparation of Project Documents. It is envisioned that the Local Legal Consultants will prepare first drafts of Request for Qualification (RFQ), Request for Proposal (RFP), the draft PPP Agreement (together the Project Documents) and any other agreements required for the Project in accordance with procurement laws and regulations </em><em>(e.g. land lease related documents, corporate guarantee, etc.), for review by the International Legal Consultant and subsequent review by IFC.&nbsp; The number and nature of the Project Documents will depend on the transaction structure chosen by the Client as a result of the Phase 1 work. </em></li>\n</ol>\n\n<p><em>In preparation of the initial drafts of the Project Documents, the Local Legal Consultant will ensure their compliance with local legislation and regulatory framework requirements., while the International Legal Consultant will ensure their alignment with best international practice. The International Legal Consultant will be responsible for the quality of the final set Project Documents.</em></p>\n\n<ol>\n\t<li><em>In collaboration with the IFC and the International Legal Consultant, support in finalizing evaluation criteria, taking into account local legislative requirements, and assessing the applications against the pre-qualification criteria, and taking into account local legislative requirements; </em></li>\n\t<li><em>Drafting relevant regulatory documents, such as government decrees if required for the Project, regulations of the Tender commission, etc. </em></li>\n\t<li><em>Drafting relevant legal sections in the project marketing documents, such as information memorandums, project presentations and other materials to be delivered to the Client and to bidders; </em></li>\n\t<li><em>Supporting the International Legal Consultant, the Client and IFC in providing responses to bidders on questions and requests for clarification related to legal aspects; </em></li>\n\t<li><em>Attending pre-bid meetings, bidders conference together with the International Legal Consultant as required, and advising the Client and IFC generally in connection with this; </em></li>\n\t<li><em>In collaboration with the International Legal Consultant, assisting IFC with the support it provides to the Client in reviewing the bids (including review of any amendments and mark-ups to the RFP and the PPP agreements (and other documents) proposed by bidders, analysis of proposals of qualified bidders, </em><em>reviewing the proposals for compliance with the RFP&rsquo;s terms</em><em>, and from the perspective of the requirements of the local legislation, and drafting the legal sections of evaluation and selection reports);</em></li>\n\t<li><em>Advising the Client and IFC on an ongoing basis to ensure compliance with the applicable procurement and other laws and regulations of Uzbekistan throughout the bid process and advising on any legal aspects and issues that might arise, and </em></li>\n\t<li><em>Preparation of minutes of the tender commission meetings. </em></li>\n\t<li><em>Assisting the Client and IFC in negotiations of the PPP Agreement (and any other relevant agreements) with the winning bidder(s) until their execution, and overall support in addressing any legal or contractual issues that may arise between bid award, signature of the project agreements and financial close.</em></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>III. MAIN </em><em>DELIVERABLES, LANGUAGE AND INDICATIVE TIMELINE</em></p>\n\n<p><em>1. Overview of Deliverables </em></p>\n\n<p><em>The Local Legal Consultant will be expected to provide the main deliverables in accordance with the below timetable. This is</em><em> indicative only and actual timelines will be mutually decided per the requirements of the Client.</em></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:654px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#cccccc; width:36.0pt\">\n\t\t\t<p><strong><em>No.</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:270.0pt\">\n\t\t\t<p><strong><em>Deliverables</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#cccccc; width:184.5pt\">\n\t\t\t<p><strong><em>Target months from Notice to Proceed</em></strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong><em>Phase I &ndash; Due Diligence and Transaction Structuring</em></strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>1.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Draft legal due diligence report</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p><em>Month 2</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>2.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Incorporation of comments from the International Legal Consultant as well as IFC, and preparation of the final due diligence report</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p><em>Two weeks from receipt of comments to the draft</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>3.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Inputs to relevant sections of the PAD and review the final set of documents that will be submitted to the Client (IFC will coordinate finalization of the PAD and the Project Concept)</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:184.5pt\">\n\t\t\t<p><em>Month 3</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:490.5pt\">\n\t\t\t<p><strong><em>Phase II &ndash; Legal Advisory Support During the Tender Process</em></strong></p>\n\n\t\t\t<p><em>~6-8 months from the end of Phase I</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>4.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Drafting the RFQ documentation </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p><em>Month 1 from Phase II kick off</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>5.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Input in the RFQ Evaluation Report, prequalification Q&amp;A </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p><em>In accordance with the tender schedule</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>6.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Preparation, of the draft RFP and PPP Agreements, for review by International Legal Consultant </em></p>\n\n\t\t\t<p><em>Support the International Legal Consultant in finalizing these documents based on comments from the Client, IFC, bidders and the PPP Agency</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p><em>Month 3 from Phase II kick off</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:36.0pt\">\n\t\t\t<p><em>7.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:270.0pt\">\n\t\t\t<p><em>Support with bidders Q&amp;A related to legal aspects, participation in the bidders&rsquo; conference;</em></p>\n\n\t\t\t<p><em>Support the International Legal Consultant and IFC with the revision of the final set of Project Documents);</em></p>\n\n\t\t\t<p><em>Assistance to the IFC, the Client and the International Legal Consultant with evaluation of proposals, and support with the finalization of the bid evaluation report from the perspective of local legislation.</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:184.5pt\">\n\t\t\t<p><em>In accordance with the tender timeline</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>2. Quality Control</em></p>\n\n<p><em>The Local Legal Consultant is required to produce a high-quality work product in accordance with best practice for law firms. This means, among other things:</em></p>\n\n<ol>\n\t<li><em>legal documents will be logically structured, clearly and economically drafted and in plain </em><em>language;</em></li>\n\t<li><em>all deliverables will be checked for spelling, cross references, consistency, etc. before being issued to the International Legal Consultant, the Client and IFC, and again before being issued to the bidders;</em></li>\n\t<li><em>work in the legal team will be done at the appropriate level of seniority and experience, and the lead partner will at all times oversee and ensure the appropriateness and quality of all legal documentation and advice; and</em></li>\n\t<li><em>all deliverables are subject to review and approval by the Client and IFC and considered final upon such approvals. All deliverables should meet the requirements described in the section. </em></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>3. Language</em></p>\n\n<p><em>Draft deliverables shall be </em><em>logically structured, clearly and economically drafted and in plain English and Russian languages.&nbsp; All deliverables will first be drafted in English and once IFC is satisfied with the draft all documents, the Local Legal Consultant will need to translate these in Russian language for the GoU&rsquo;s approval processes.</em></p>\n\n<p><em>For the avoidance of doubt, the Local Legal Consultant will also provide for translation of those deliverables that are prepared by the International Legal Consultant. Specifically, the Local Legal Consultant will bear the primary responsibility for preparing the translation of the Project Documents into the Russian language and ensure that the translation is correct and consistent. </em></p>\n\n<p>&nbsp;</p>\n\n<p><em>IV. SCHEDULE OF PAYMENT</em></p>\n\n<p><em>The remuneration for the activities described in these Terms of Reference </em><em>will be a lump sum, inclusive of all staff costs, printing, translation, communications, travel, accommodation and the like, and all other costs incurred by the Local Legal Consultant in carrying out the assignment as described above.&nbsp; </em></p>\n\n<p><em>Payments will be made in accordance with the following schedule:</em></p>\n\n<ul>\n\t<li><em>Submission of final legal due diligence report (20%)</em></li>\n\t<li><em>Submission of inputs to PAD related to legal sections (10%)</em></li>\n\t<li><em>Finalization of the prequalification process (10%)</em></li>\n\t<li><em>Approval of final set of Project Documents by the Client (20%)</em></li>\n\t<li><em>Evaluation of technical and financial bids (20%)</em></li>\n\t<li><em>Signing of the PPP Agreement (20%).</em></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>V. ASSUMPTIONS </em></p>\n\n<p><em>The Local Legal Consultant may make the following assumptions:</em></p>\n\n<p>&nbsp;</p>\n\n<p><em>1. Time</em></p>\n\n<p><em>Phase 1: Due Diligence and Transaction Structuring is expected to last between three to four months. There will likely be a period of several weeks during which the Client will be reviewing the PAD and making a decision.</em></p>\n\n<p><em>Phase 2: Implementation to Commercial Close is expected to last between six to eight months.</em></p>\n\n<p><em>The above timeline is indicative, the actual schedule will depend on the complexity of issues discovered during due diligence and the Client&rsquo;s decision-making process. As such, the Client may from time to time instruct the Local Legal Consultant to cease working, e.g., in case of delays in the Project schedule or periods when government decisions are required, whereupon these periods will be notionally suspended. </em></p>\n\n<p>&nbsp;</p>\n\n<p><em>2. Data and interviews</em></p>\n\n<p><em>The Local Legal Consultant will be required to collect the necessary data and information required for the legal due diligence including requesting data, confirmations, meetings and interviews with Government representatives as might be required. </em></p>\n\n<p>&nbsp;</p>\n\n<p><em>3. Specific Inputs to be Provided to the Local Legal Consultant</em></p>\n\n<p><em>Once the Local Legal Consultant&rsquo;s contract is effective, the Client and IFC will make available to the Local Legal Consultant all relevant documents, files, reports, governmental opinions and any other information that may be needed so that the employed staff members are fully aware of latest developments and needs of the Project. Such documentation may be in Russian and/or English translation. </em></p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>4. Other Assumptions</em></strong></p>\n\n<ul>\n\t<li><em>It is expected that the Local Legal Consultant&rsquo;s responsibilities will be focused on activities as set out under Phase 1. During Phase 2, the Local Legal Consultant will provide inputs to workstreams lead by the International Legal Consultant which will be primarily responsible for delivering the tasks under this phase. It is envisioned that the International Legal Consultant will take the lead in the discussions and activities related to legal aspects during Phase 2.</em></li>\n\t<li><em>The Local Legal Consultant will, under the supervision and support of the International Legal Consultant, prepare the initial drafts of the RFQ, RFP and the PPP Agreement and particularly ensure that these are compliant with local legal and regulatory requirements. The International Legal Consultant will finalize and will be fully responsible for the final versions of these Project Documents, including setting out of best-practice elements when required. </em></li>\n\t<li><em>Should there be a need to provide any legislative drafting for the Client in order to advance the Project (such as decrees, or other similar legislative documents), the number of such documents to be produced by the Local Legal Consultant will be limited to three. </em></li>\n\t<li><em>The Local Legal Consultant may require normal market input from other advisors (e.g. technical / financial / insurance) on issues falling within the customary mandate of such experts, to facilitate drafting of the contract and other project documents within the legal scope;</em></li>\n\t<li><em>This assignment has an inherently &ldquo;open&rdquo; nature and it is the responsibility of the Local Legal Consultant to be proactive and identify and execute any additional tasks that may be required in order to ensure the success of the Project.</em><em> </em><em>In case either IFC or the Client may need to request complementary analysis, the Local Legal Consultant will therefore have to be in a position to take on and complete any such complementary task.</em></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>VI. LOCAL LEGAL CONSULTANT PROFILE AND QUALIFICATION REQUIREMENTS</em></p>\n\n<p><em>1. Functional Experience</em></p>\n\n<p><em>The Local Legal Consultant will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference. In particular, the Local Legal Consultant should demonstrate experience in: </em></p>\n\n<ul>\n\t<li><em>Providing legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector); </em></li>\n\t<li><em>Experience in providing the legal advice in investment projects in infrastructure and social facilities in Uzbekistan in the past 10 years (preferably experience in healthcare sector);</em></li>\n</ul>\n\n<p><em>For the evaluation purpose the candidates should provide the information on experience and projects at least for 5, but no more than for 10 projects, by filling out the forms below:</em></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:512.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:24.15pt\">\n\t\t\t<p><em>N</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.9pt\">\n\t\t\t<p><em>Project</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:89.85pt\">\n\t\t\t<p><em>Project start date (year, month mandatory)</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:61.55pt\">\n\t\t\t<p><em>Project end date (year, month mandatory)</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:68.3pt\">\n\t\t\t<p><em>Client</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:63.8pt\">\n\t\t\t<p><em>Country</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:63.8pt\">\n\t\t\t<p><em>Contracted Firm</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p><em>Participated lawyers in the project among the recommended personnel (full name)</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:512.5pt\">\n\t\t\t<p><em>Experience in providing the </em><em>legal advice and structuring PPP transactions in Central Asia in the past 10 years (preferably experience in healthcare sector)</em><em>.&nbsp; </em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>1</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>2</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>...</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"8\" style=\"height:15.0pt; width:512.5pt\">\n\t\t\t<p><em>Experience in providing the legal advice in investment projects in infrastructure and social facilities in Uzbekistan in the past 10 years (preferably experience in healthcare sector).</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>&hellip;</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>&hellip;</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:24.15pt\">\n\t\t\t<p><em>10</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:67.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:89.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:61.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:68.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:63.8pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Detailed information on the projects mentioned in the form above.</em></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Project name</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p><em>Country / region</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Project start date</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Project end date</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Interrupted/uninterrupted</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Client</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; width:143.75pt\">\n\t\t\t<p><em>Participated lawyers in the project among the recommended personnel (full name)</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Source of financing</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>Project description </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p><em>The role of the consulting firm </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.4pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p><em>(indicate your role and contribution in terms of men-months) </em></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>ANNEX 2</em></strong></p>\n\n<p><strong><em>Structure of Project Evaluation Document</em></strong></p>\n\n<p><strong><em>(in accordance with Cabinet of Ministers Decree #259 date 26.04.2020)</em></strong></p>\n\n<p>&nbsp;</p>\n\n<p><em>Important note: The presented structure below is an unofficial translation and is provided for reference purpose only. The International Legal Consultant is responsible for checking the requirements to the structure of the Project Evaluation Document and Project Concept, in accordance with the local legislation. </em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><em>Name of the project:</em></li>\n\t<li><em>Name of the initiator:</em></li>\n\t<li><em>The estimated total cost of the project:</em></li>\n\t<li><em>The scope of the project, including its capacity:</em></li>\n\t<li><em>The components of the project - with the price of each:</em></li>\n\t<li><em>Project location (region, district, city):</em></li>\n\t<li><em>In quantitative terms, including the goals and objectives of the project:</em></li>\n\t<li><em>The main beneficiaries:</em></li>\n\t<li><em>Sources and schemes of financing:</em></li>\n\t<li><em>Project implementation period with annual funding/financing:</em></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>1. <strong>The economic section</strong> reflects the analysis of the project in terms of the economy of the whole republic or region. In this section, if necessary, the following may be reflected:</em></p>\n\n<p><em>assessment of economic benefits and costs of the project, including project costs, consequences and impact analysis, costs, and immeasurable benefits, added benefits and costs, non-recoverable costs, external impacts, project assessment of indirect benefits.</em></p>\n\n<p><em>the feasibility of the project in the context of the development concepts of industries, the demand in medical services and need for the construction of multifunctional hospital, the optimal placement of the project and production capacity, the use of available capacity, as well as the conjuncture of the market of raw materials and manufactured products</em></p>\n\n<p><br />\n<em>2. <strong>The financial section</strong> includes the initial estimates and bases of financial expenses and income, alternative schemes and sources of project financing, and also an assessment of financial efficiency of project implementation, the financial model.</em></p>\n\n<p><em>In this section, if necessary, the following information should be reflected:</em></p>\n\n<ul>\n\t<li><em>Project period, technological schedule, and sequence by taking into account the amount of financing and source of financing. </em></li>\n\t<li><em>total investment cost in different project stages with financing amount. </em></li>\n\t<li><em>production cost</em></li>\n\t<li><em>Project financial indicators with following information:</em></li>\n\t<li><em>product cost, tariffs, output price of the product</em></li>\n\t<li><em>proceeds from sales, distributed profit and retained earnings</em></li>\n\t<li><em>cash flow statement</em></li>\n\t<li><em>NPV, IRR, WACC</em></li>\n\t<li><em>Project liquidity analysis</em></li>\n\t<li><em>Financing scheme, sources and conditions</em></li>\n\t<li><em>Assessment of financial risks</em></li>\n</ul>\n\n<p><strong><em>3. Social section</em></strong></p>\n\n<ul>\n\t<li><em>The demand and its impact on employment</em></li>\n\t<li><em>Educating staff and training</em></li>\n\t<li><em>Labor protection and safety standards </em></li>\n\t<li><em>The social importance of the project by taking into account any decree, or government related decisions</em></li>\n</ul>\n\n<p><strong><em>4. Marketing</em></strong></p>\n\n<p><em>Recommendations on the assessment and application of market factors on technical requirements and the distribution of risks. </em></p>\n\n<p><strong><em>5. Technical section</em></strong></p>\n\n<p><em>This section shows the technical solutions for the project, the project structure, indicators, components and cost</em></p>\n\n<p><strong><em>6. Ecologic section</em></strong></p>\n\n<ul>\n\t<li><em>The impact on environment</em></li>\n\t<li><em>The assessment of negative environmental impacts, action on reduction of negative impacts by taking into account the recommendations of ecology committee</em></li>\n</ul>\n\n<p><strong><em>7. Institutional section</em></strong></p>\n\n<ul>\n\t<li><em>project management scheme, legal framework, management structure and financial cost</em></li>\n\t<li><em>Interaction of project participants, cost, profit sharing, risk reduction activities</em></li>\n</ul>\n\n<p><strong><em>8. Architecture and construction </em></strong></p>\n\n<ul>\n\t<li><em>a description of the architectural-planning of projects of the area by taking into account lines, energy systems, oil and gas pipelines, road and railway and settlements. </em></li>\n</ul>\n\n<p><strong><em>9. Optimal PPP models</em></strong><em> </em></p>\n\n<p><em>The description of different scenarios, payment schemes, and the need for providing the support from the government. </em></p>\n\n<p><strong><em>10. Types of government support</em></strong></p>\n\n<ul>\n\t<li><em>the list of all required licenses and other required documents </em></li>\n\t<li><em>subsidies, minimum guaranteed payments</em></li>\n\t<li><em>Government guarantee </em></li>\n\t<li><em>tax incentives and other incentives</em></li>\n\t<li><em>other guarantees and compensations</em></li>\n\t<li><em>budget loans, grants, credit lines and other forms of financing.</em></li>\n\t<li><em>payment for use of services from the government budget</em></li>\n</ul>\n\n<p><strong><em>11. Project Plan</em></strong></p>\n\n<ul>\n\t<li><em>Marketing Plan</em></li>\n\t<li><em>Project implementation deadline</em></li>\n\t<li><em>Identification of main stakeholders and the role of stakeholders.</em></li>\n</ul>\n\n<p><strong><em>12.The project assessment for more than 10 million USD project includes following documents:</em></strong></p>\n\n<p><em>Social and environmental impact, indicators and components substantiating efficiency of the Project.</em></p>"},{"id":"OP00100971","notice_type":"Request for Expression of Interest","noticedate":"21-Oct-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-11-04T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Ukraine","project_id":"P161586","project_name":"Strengthening Public Resource Management","bid_reference_no":"MF-IC-4","bid_description":"Business analyst  of Prozorro and State Treasury sets of data","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"12/2, Hrushevskoho Str., Kyiv, 01008","contact_ctry_name":"Ukraine","contact_email":"shevliakov@minfin.gov.ua","contact_name":"Igor Shevliakov","contact_organization":"Ministry of Finance of Ukraine","contact_phone_no":"+380442065773","contact_web_url":"www.minfin.gov.ua","submission_date":"2020-10-21T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST </strong></p>\n\n<p><strong>(REoI# MF-IC-4)</strong></p>\n\n<p>CONSULTING SERVICES &ndash; INDIVIDUAL CONSULTANT)</p>\n\n<p>Public Resource Management Project, Part B: Support to PFM Strategy Implementation (Project Number P161586)</p>\n\n<p><strong>Grant No. &nbsp;TF0A5324</strong></p>\n\n<p>Assignment Title: Business analyst of Prozorro and State Treasury sets of data</p>\n\n<p><strong>Reference No. MF-IC-4</strong><br />\nThe Government of Ukraine has received financing from the World Bank acting as administrator of the grant funds provided by the European Commission on behalf of the European Union under the EC - World Bank Partnership Program for Europe and Central Asia Trust Fund (EU Programme for the Reform of Public Administration and Finances (EURoPAF) toward the cost of the Strengthening Public Resource Management Project, and intends to apply part of the proceeds for consulting services.</p>\n\n<p>The Ministry of Finance of Ukraine (&ldquo;MoF&rdquo;) is responsible for the implementation of Part B of the Project and, in order to strengthen its capacity to implement the Project, engages an individual consultant (&ldquo;Consultant&rdquo;) for the business analysis of ProZorro Unified Electronic Public Procurement System (&ldquo;ProZorro System&rdquo;), and the State Treasury Service of Ukraine (&ldquo;State Treasury&rdquo;) sets of data regarding the possibility of their use in the forecasting methodology.</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include the data sets analysis and to give recommendations to collect data of State Treasury, ProZorro System including data on E-contracting agreements which will allow using these data of these fields for forecasting of cash outflows.</p>\n\n<p>The Services are to be rendered at Consultant`s place of residence.</p>\n\n<p>The Consultant is expected to provide the services during the period from November &nbsp;2020 through January 2021. The expected working time spent generally shall not exceed 45 working days.</p>\n\n<p>More detailed information is stipulated in the ToR which is attached.</p>\n\n<p>The MoF now invites eligible individual local consultants &ndash; physical persons (&ldquo;Candidates&rdquo;) to indicate their interest in providing the Services in the form of CV (in Ukrainian or English). Interested Candidates should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>The Candidates shall provide confirmation in the form of references to publicly confirmed and accessible information, or provide copies of relevant documents confirming the respective status or condition.</p>\n\n<p>Interested Candidates are invited to submit any supplementary documents to evidence that Candidate meets with the qualification criteria for the position of the Consultant.</p>\n\n<p><u>Mandatory qualification of the Consultant:</u></p>\n\n<ul>\n\t<li>Bachelor&rsquo;s or Master&rsquo;s degree in the economics or related fields.</li>\n\t<li>at least 3 years of work experience according to the degree;</li>\n\t<li>experience of work for at least 1 year in the fields of Public finance system related to Prozorro System, State Treasury or Ministry of Finance;</li>\n\t<li>practical skills of preparation of analytical materials (reports, reviews, recommendations etc.)</li>\n\t<li>fluent speaking and writing in Ukrainian.</li>\n</ul>\n\n<p><u>The attention of interested Consultants is especially drawn to additional Consultants qualification requirements corresponding to the peculiarities of the assignment, meeting them would be an advantage</u>:</p>\n\n<ul>\n\t<li>confirmed awareness and work with a big amount of data (Big Data) and its analysis;</li>\n\t<li>proven experience in performing similar tasks during the last 3 years;</li>\n\t<li>experience in analytics preparation in the field of public procurements and / or Treasury system service.</li>\n\t<li>experience in cash management.</li>\n</ul>\n\n<p>The attention of interested Candidates is drawn to Section III, paragraphs, 3.14,3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo;, July 1, 2016 with revisions as of November 2017 and August 2018&rdquo;(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p><strong>A Consultant will be selected in accordance with the Selection of Individual Consultants method (IC) set out in the Procurement Regulations</strong>.</p>\n\n<p>Interested Candidates may obtain further information at the address below during office hours: 10:00 to 18:00.</p>\n\n<p>Contact person: Volodymyr Vorotyuk</p>\n\n<p>Tel: &nbsp;&nbsp;&nbsp;&nbsp; <strong>+</strong>38 044 206 5773, 380 50 4100340</p>\n\n<p>E-mail: vorotyuk@outlook.com</p>\n\n<p>Expressions of interest must be delivered by mail, fax or e-mail to the address below by 5 pm on November 4, 2020.</p>\n\n<p>For EoIs submission:</p>\n\n<p><strong>Ministry of Finance of Ukraine</strong></p>\n\n<p><strong>Attn: Mr. Igor Shevliakov, Head, Expert Group for EU Integration, Directorate for Strategic Planning and European Integration</strong></p>\n\n<p>The letter subject is &ndash; &ldquo;Expression of interest on - MF-IC-4, Business analyst of Prozorro and State Treasury sets of data</p>\n\n<p>E-mail: shevliakov@minfin.gov.ua<strong> </strong>&nbsp;mandatory copy to: vorotyuk@outlook.com.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Attachment to REoI # MF-IC-4</strong></p>\n\n<p><strong>Terms of Reference</strong></p>\n\n<p>for provision of consulting services:</p>\n\n<p><strong><u>Business analyst of Prozorro and State Treasury sets of data</u></strong></p>\n\n<p><strong>(Individual consultant)</strong></p>\n\n<p>Contract reference No.: MF-IC-4</p>\n\n<ol>\n\t<li>BACKGROUND INFORMATION</li>\n</ol>\n\n<p>The Government of Ukraine has received financial assistance from the International Bank for Reconstruction and Development (&ldquo;the World Bank&rdquo;), acting as administrator of the grant provided by the European Commission on behalf of the European Union (&ldquo;Donor&rdquo;) under the EC-World Bank Partnership Program for Europe and Central Asia Programmatic Single-Donor Trust Fund (EU Programme for the Reform&nbsp; of Public Administration and Finances (EURoPAF) three million thirty thousand six hundred sixty-one euros (EUR 3,030,661) (&ldquo;Grant&rdquo;) to implement the Strengthening Public Resource Management Project (&ldquo;Project&rdquo;). This Project consists of two parts: Part A &ldquo;Strengthening Human Resource Management in Public Administration Institutions&rdquo;; and Part B &ldquo;Support to PFM Strategy Implementation&rdquo;.</p>\n\n<p>Part B of the Project, total amount of which is one million one hundred ten thousand six hundred eighteen euros (EUR 1,110,618), supports the activities aimed at implementing the PFM Strategy for 2017-2020 and identifies future investments in ICT for PFM through carrying out the audit of ICT; modernization of existing ICT equipment for business continuity at the Ministry of Finance of Ukraine (MoF); and strengthening ICT system capabilities, etc.</p>\n\n<p>MoF is responsible for the implementation of Part B of the Project and, in order to strengthen its capacity to implement the Project, engages an individual consultant (&ldquo;Consultant&rdquo;) for the business analysis of ProZorro Unified Electronic Public Procurement System (&ldquo;ProZorro System&rdquo;), and the State Treasury Service of Ukraine (&ldquo;State Treasury&rdquo;) sets of data[1] regarding the possibility of their use in the forecasting methodology.</p>\n\n<p>2. PROBLEM DESCRIPTION</p>\n\n<p>Today, the MoF is developing a methodology for the cash flow forecasting at Treasury Single Account (&ldquo;TSA&rdquo;). The first version of the forecasting methodology, which is planned to be approved at the beginning of the fourth quarter of 2020, will include the calculation of expenditures of funds managers based on the database, monthly plans and information provided by individual managers on dates and amounts of large transactions.</p>\n\n<p>In future, there is an opportunity to increase the accuracy of the cost forecasting by using E-data [2] - on the payments made, i.&nbsp;e. the funds outflow from the TSA.</p>\n\n<p>3. OBJECTIVES OF THE ASSIGNMENT</p>\n\n<p>The purpose of this assignment is to provide MoF with the services of the data sets analysis and to give recommendations to collect data of State Treasury, ProZorro System including data on E-contracting agreements which will allow using these data of these fields for forecasting of cash outflows.</p>\n\n<p>4. SCOPE OF SERVICES AND TASKS</p>\n\n<p>The consultant must perform the following tasks within the following stages:</p>\n\n<p><em>At the stage of analysis, the Consultant shall:</em></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Analyze the data and identify patterns among the data sets provided by the State Treasury, ProZorro System including the following:\n\t\t<ul>\n\t\t\t<li>Analysis on the possibility to use the existing data of State Treasury Registries on budget commitments and financial budget commitments to forecast big payments (in an amount of 100 million and more with one counterparty);</li>\n\t\t\t<li>Analysis of the data sets&rsquo; fields from the ProZorro System, as well as E-data, to track TSA outflows and improve forecasting.</li>\n\t\t\t<li>Analysis of data payments from E-data, data of State Treasury Registries and data from ProZorro System including new E-data fields available from 15th of September 2020.</li>\n\t\t</ul>\n\t\t</li>\n\t\t<li>Accumulate and catalog relevant documents, data relevant to the analysis;</li>\n\t\t<li>Prepare, present, and revise (if needed) Analytical Report of patterns revealed;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>At the stage of implementing the results of the analysis and providing recommendations, the Consultant shall:</em></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Summarize key patterns revealed and set plan for further development;</li>\n\t\t<li>Prepare, present and revise (as required) Final Report with recommendations containing the analysis of patterns revealed among datasets provided by the State Treasury, ProZorro System with proposals concerning using information about future outflows from TSA in the forecasting process.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>5. COORDINATION, ACCOUNTABILITY AND REPORTING</p>\n\n<p>The Consultant shall work under the supervision of the Project Coordinator from the MoF and shall be accountable/report to him/her.</p>\n\n<p>The MoF expects that the Consultant will provide services in a timely manner and to the highest professional and ethical standards.</p>\n\n<p>The Consultant will conclude comprehensive and deep analysis of data as set in the paragraph 4.1. being in close cooperation with the MoF representatives and develop recommendations as a work tool to be used in forecasting process.</p>\n\n<p>The Consultant shall prepare and submit to the MoF the following reports:</p>\n\n<ul>\n\t<li>Analytical Report of patterns revealed among datasets provided by the State Treasury, ProZorro System;</li>\n\t<li>Final Analytical Report with proposals concerning using information about future outflows from TSA in the forecasting process.</li>\n</ul>\n\n<ol>\n\t<li>The Consultant shall submit the Analytical Report of patterns revealed among datasets provided by the State Treasury, ProZorro System to the MoF no later than 20 working days from the assignment commencement. The report is to be prepared based on the results of the activities provided for in paragraph 4.1 and shall include the information on:</li>\n</ol>\n\n<ul>\n\t<li>Information on the volume of data analyzed;</li>\n\t<li>Problematic issues that the Consultant faced during analyzing the sets of data and proposal how to address them;</li>\n\t<li>Detailed description of patterns revealed among datasets provided by the State Treasury, ProZorro System;</li>\n\t<li>other information at the discretion of the Consultant.</li>\n</ul>\n\n<p>The following is attached to the Report:</p>\n\n<ul>\n\t<li>Documents and data relevant to the analysis;</li>\n\t<li>Other documents on discretion of the Consultant.</li>\n</ul>\n\n<ol>\n\t<li>The Consultant shall submit the Final Analytical Report with proposals concerning using information about future outflows from TSA in the forecasting process no later than 45 working days from the assignment commencement. The report is to be prepared based on the results of the activities provided for in paragraphs 4.4 - 4.5 and shall include the information on:</li>\n</ol>\n\n<ul>\n\t<li>Proposals of using data from ProZorro System (including structure of standard E-Data) in forecasting, changes of legal bases to make it possible;</li>\n\t<li>Proposals of using data from Registry of budget commitments and budget financial commitments, in forecasting of one-day payments to one counterparty in the amount of 100 million;</li>\n\t<li>Detailed description of patterns revealed among datasets provided by the State Treasury, ProZorro System;</li>\n\t<li>Description of the methodology used for quality assurance of the recommendation development to meet with the assignment objectives.</li>\n</ul>\n\n<p>The following is attached to the Report:</p>\n\n<ul>\n\t<li>Recommendations on business processes modification that will make it possible to use the data from ProZorro System and / or from Registry of budget commitments and budget financial commitments for foreсasting of cash outflows, model samples of using these data.</li>\n</ul>\n\n<ol>\n\t<li>Reporting requirements.</li>\n</ol>\n\n<p>All reports are compiled in Ukrainian language. Any appendices to them shall be in the original language.</p>\n\n<p>All reporting documents shall be submitted by the Consultant in the following manner:</p>\n\n<ul>\n\t<li>The Consultant shall submit the reporting documents in electronic form via email: _________ for review and comments by the MoF (reports shall be signed by the Consultant, scanned in pdf format and sent from Consultant`s e-mail indicated in para. 4 below). Supporting documents shall be in the MS&nbsp;Word, MS&nbsp;Excel or MS&nbsp;PowerPoint format or any other form previously agreed with or acceptable to the MoF, depending on the type of a document.</li>\n\t<li>If the MoF agreed reporting documents submitted via email, the Consultant shall submit them in paper form in 2 hard copies signed by the Consultant. The Paper version shall be submitted on the following address: Kyiv, 04071, Mezhegirska str., build. 11, Attn to Mr. Igor Shevliakov.</li>\n</ul>\n\n<p>If the Consultant&rsquo;s report refers to previously prepared information or documents, such documents shall be attached to the report.</p>\n\n<ol>\n\t<li>Review and approval of reports</li>\n</ol>\n\n<p>The MoF reviews the submitted report and approves or provides comments within 10 working days from the date of receiving the report about the results of work. The comments on the reports are set out in writing and sent to the Consultant via email: <em>&nbsp;_________________ </em>with the notification of delivery of the message. The consultant confirms the receipt of the comments and sets the deadline for their consideration within a day after receiving the MoF&rsquo;s comments. The Consultant shall take into account the MoF&rsquo;s comments and re-submit updated report(s) MoF no later than within 5 working days from the date of their receipt to the e-mail, specified by the Consultant.</p>\n\n<p>In the absence of the MoF&rsquo;s comments within the specified period, such reports are considered accepted.</p>\n\n<p>6. CLIENT INPUTS</p>\n\n<p>The MoF provides the Consultant with:</p>\n\n<ol>\n\t<li>all relevant documents and data, in accordance with the current legislation of Ukraine,</li>\n\t<li>access to the MoF data and materials related to the assignment.</li>\n\t<li>organizing joint meetings with the Consultant on Cash Management Capacity Building.</li>\n</ol>\n\n<p>7. PLACE, DURATION, WORKING CONDITIONS AND REMUNERATION</p>\n\n<p>The Consultant is expected to provide the services during the period from November 2020 through January 2021. The expected working time spent generally shall not exceed 45 working days. -The Consultant will perform the assignment at his/her place of residence.</p>\n\n<p>The payment for the services provided will be made against reports accepted.</p>\n\n<p>The Consultant is responsible for all costs incurred in connection with the provision of services, including, but not limited to the following: accommodation at the place of service, translation, communication costs, printed materials.</p>\n\n<p>The selection of consultant will be done in accordance with the Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo;, July 1, 2016 with revisions as of November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;).</p>\n\n<p>8. QUALIFICATION REQUIREMENTS</p>\n\n<p>The consultant shall meet the following qualification requirements:</p>\n\n<p><strong>Mandatory qualification of the Consultant:</strong></p>\n\n<ul>\n\t<li>Bachelor&rsquo;s or Master&rsquo;s degree in the economics or related fields.</li>\n\t<li>at least 3 years of work experience according to the degree:</li>\n\t<li>experience of work for at least 1 year in the fields of Public finance system related to Prozorro System, State Treasury or Ministry of Finance;</li>\n\t<li>practical skills of preparation of analytical materials (reports, reviews, recommendations etc.)</li>\n\t<li>fluent speaking and writing in Ukrainian.</li>\n</ul>\n\n<p><strong>Additional qualification requirements that meet the specifics of the task and will be accepted as an advantage</strong></p>\n\n<p>Compliance of the Consultant with the following qualification requirements will be considered by the Customer as an advantage:</p>\n\n<ul>\n\t<li>confirmed awareness and work with a big amount of data (Big Data) and its analysis;</li>\n\t<li>proven experience in performing similar tasks during the last 3 years;</li>\n\t<li>experience in analytics preparation in the field of public procurements and / or Treasury system service.</li>\n\t<li>experience in cash management.</li>\n</ul>\n\n<p>[1] Implies sets of information (as &nbsp;structured &nbsp;as well as unstructured) so large that traditional methods and approaches (mostly based on class solutions, &nbsp;business analytics &nbsp;and &nbsp;database management systems &nbsp;) cannot be applied to them. Known as Big data sets.</p>\n\n<p>[2]Single web portal on the use of public funds ( &nbsp;https://spending.gov.ua/ca/edata &nbsp;)</p>"},{"id":"OP00100471","notice_type":"Request for Expression of Interest","noticedate":"18-Oct-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-11-03T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Afghanistan","project_id":"P166978","project_name":"Tackling Afghanistan’s Government HRM and Institutional Reforms","bid_reference_no":"AF-IARCSC-TAGHIR-198793-CS-CQS","bid_description":"Consultant Services (FIRM) for Computer Based Examination System Vulnerability Assessment with the IARCSC.","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Darul Aman Road","contact_ctry_name":"Afghanistan","contact_email":"MAYAN@IARCSC.GOV.AF","contact_name":"Mujtaba Ayan","contact_organization":"Independent Administrative Reform and Civil Service Commision","contact_phone_no":"+93799374316","contact_web_url":"https://iarcsc.gov.af","submission_date":"2020-10-18T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>Government of Islamic Republic of Afghanistan (GoIRA)</p>\n\n<p>Independent Administrative Reform and Civil Service Commission (IARCSC)</p>\n\n<p>Tackling Afghanistan&rsquo;s Government HRM and Institutional Reform (TAGHIR) project</p>\n\n<p><strong>Grant No</strong>.: TF-0A9123, D413-AF</p>\n\n<p><strong>Assignment Title</strong>: Consultancy Services, Computer Based Examination System Vulnerability Assessment.</p>\n\n<p><strong>Reference No</strong>. AF-IARCSC-TAGHIR-198793-CS-CQS</p>\n\n<p>The Islamic Republic of Afghanistan expects to finance from the World Bank toward the cost of Tackling Afghanistan&rsquo;s HRM and Institutional Reform (TAGHIR) and intends to apply part of the proceeds for consulting services. The consulting services (&ldquo;the Services&rdquo;) include:</p>\n\n<ol>\n\t<li>This assessment will cover both the contents part of the e-examination system and the network infrastructures using advanced technology and subject matter experts.</li>\n\t<li>The assessment envisages answering the questions of &ldquo;since the establishment of the system, what worked well?&rdquo; &ldquo;What did not work&rdquo; &ldquo;what and how need to be done to further improve the system?&rdquo; and &ldquo;to what extent the current exam contents assess candidates&rsquo; necessary skills for a job?&rdquo;</li>\n</ol>\n\n<p><strong>&nbsp;Assignment</strong></p>\n\n<p>The current E-examination system is developed in an open-source technology which is PHP. The backend technology (relational database management system) is also an open-source technology called PostgreSQL. The system architecture is client-server and is web-based. HTML, CSS, Bootstrap, and JavaScript technologies are used for front end design while PHP is used as a server-side scripting language.</p>\n\n<p>The system is deployed on a physical server (Dell R720) which is connected via a local telecom that provides Virtual Private Network via Microwave channels and is accessible and expandable to all the provinces. Currently, the system is being used in Balkh, Kandahar, Herat, Khost, Bamyan, Nangarhar, 2 sites in Kabul, Logar, Jozjan, Helmand, and Takhar provinces.</p>\n\n<p>The current content development process is a combination of manual and digital processes. The processes are divided into two phases a) Production and b) Executive. In the production phase, the content developers, taking into account the need-based and market-reality approaches, conduct research and develop e-questions. After a comprehensive personal and team review, the questions qualify to be fed into the system. In the executive phase, the IT section of the Exam Content Research Development Centre (ECRDC) creates usernames and passwords for potential candidates who take E-examination at e-exam centers across the country. The content developing teams - under a scheduled routine procedure - conduct both monitoring and observation tasks during the e-examination.</p>\n\n<p>Since 2019 the E-examination system has been operationalized and welcomed by citizens. To sustain and improve the system, IARCSC is looking to outsource an in-depth system assessment (process audit) by a third party to find out system vulnerabilities and risks</p>\n\n<p><strong>Purpose</strong></p>\n\n<p>The purpose of this assessment is to boost the system&rsquo;s cybersecurity and transparency through capturing and analyzing system security risks, systematic fraud opportunities, and human unnecessary interventions in the E-examination. And to find out accuracy, rationality, relevancy, coherence, and efficiency, effectiveness, and impact; the contents part of the e-examination system will be evaluated too.&nbsp;</p>\n\n<p><strong>Scope</strong></p>\n\n<p>IARCSC is implementing a third-party in-depth assessment of E-examination system from an IT perspective (applications, security devices, server, and overall IT infrastructure) to improve system security, data integrity, accuracy, and transparency within the following working scope. The consultant is required to identify all the technical issues, the vulnerabilities in the network infrastructure, hardware, software systems and recommend the actions and procedures required to ensure that the system complies with all the standards with regards to availability, security, and performance. Advanced latest technology needs to be used for the scanning and analysis of the system.</p>\n\n<p>The Independent Administrative Reform and Civil Service Commission (IARCSC)- Tacking Afghanistan&rsquo;s Government HRM and Institutional Reform (TAGHIR) Project now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p><strong>The shortlisting criteria are: </strong></p>\n\n<ul>\n\t<li>The consultant shall demonstrate having sound financial situation and capacity by submitting financial audit report with annual turnover of at least <strong>US$ 40,000</strong> for any of the last 3 years (2017, 2018 &amp; 2019);</li>\n\t<li>The consultant shall also provide proven experiences of having executed at least one contract of similar nature, with the value of minimum <strong>US$ 32,000</strong></li>\n\t<li>Organizational Structure and Manpower with qualifications, technical and professional competence necessary for successful implementation of the assignment</li>\n</ul>\n\n<p><strong>Guidance Note for JV and Sub-Consultants:</strong></p>\n\n<p>The requirements for Consultants who intends to associate with other firm (s) in the form of a Joint Venture (JV) or Consortium or a sub-consultancy to enhance their qualifications are indicated as under:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The lead partner is required to be identified clearly and state the composition and nature of their association (JV/ sub-consultant) in their EOI.</li>\n\t\t<li>In the case of JV, both the lead and partners shall meet all the requirement indicated above.</li>\n\t\t<li>In case of Consultant who intends to associate with other firm(s) in the form of a sub-consultancy, the lead partner <strong><u>shall provide valid reason for proposing a sub-consultant</u></strong>.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p><strong>Note:</strong> The Consultant should explain the exact role played by the Consultant in the assignment if the assignment was carried out in association with other firms as JV.</p>\n\n<p>Key Experts will be evaluated at the shortlisting stage.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>A Consultant will be selected in accordance with the <strong>Consultant Qualification Selection (QCS) </strong>method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours i.e. 9:00 am- 3:30 pm Afghanistan local time</p>\n\n<p>Expression of Interest must be delivered in a written form to the address below (in person or by email, or by fax) by <strong>3rd day of November 2020 23:45 (</strong>Kabul, Afghanistan Local Time) duly quoting the case&rsquo;s reference number i.e. AF-IARCSC-TAGHIR-198793-CS-CQS</p>\n\n<p><strong>Note: </strong><strong>The detailed Terms of Reference (TOR) for the assignment can be found at the following website: (<u>https://ageops.net</u> ) or can be obtained at the address given below and through requesting from the below email addresses. </strong></p>\n\n<p>&nbsp;</p>\n\n<p><em>Independent Administrative Reform and Civil Service Commission (IARCSC)</em></p>\n\n<p><em>Tackling Afghanistan&rsquo;s Government HRM and Institutional Reform (TAGHIR)</em></p>\n\n<p><em>Sanatorium Street, Darulaman Road, PD No. 6, Kabul, Afghanistan </em></p>\n\n<p>Email: <u>rahima.paiman@iarcsc.gov.af</u> / <u>taghirproject@iarcsc.gov.af</u></p>\n\n<p>Copies to: <u>mayan@iarcsc.gov.af</u> &nbsp;&nbsp;</p>"},{"id":"OP00087705","notice_type":"Request for Expression of Interest","noticedate":"22-Apr-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-05-11T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Micronesia, Federated States of","project_id":"P170718","project_name":"Digital Federated States of Micronesia Project","bid_reference_no":"FM-DOFA-165174-CS-CQS","bid_description":"Detailed Design & Materials Specs. for FTTH","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"FSM National Government PO Box PS 158 Palikir Pohnpei 96941","contact_ctry_name":"Micronesia, Federated States of","contact_email":"sennyphillipiif@mail.fm","contact_name":"SENNY PHILLIP","contact_organization":"Department of Finance and Administration","contact_phone_no":"+691 9233790","contact_web_url":"fsmsofa@mail.fm","submission_date":"2020-04-22T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Federated States of Micronesia</strong><strong> </strong></p>\n\n<p><strong>Digital FSM Project &ndash; National Digital Connectivity Infrastructure</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Loan No./Credit No./ Grant No.: D556-FM</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title: FSM FTTH Network Design</strong></p>\n\n<p><strong>Reference No</strong>. FM-DOFA-165174-CS-CQS</p>\n\n<p>&nbsp;</p>\n\n<p>The Federated State of Micronesia has received<em> </em>financing from the World Bank toward the cost of the Digital FSM Project and intends to apply part of the proceeds for consulting services.</p>\n\n<p>&nbsp;</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include design of the Fiber the Home (FTTH) network for the main islands of Yap, Pohnpei and Kosrae States to the specification of FSMT Cable. FSMT Cable is the National FSM Government owned Open Access Entity and is responsible for implementation of the FTTH network across the main islands of each of the four states.</p>\n\n<p>&nbsp;</p>\n\n<p>FSMT Cable is looking for expertise to help it iterate the design and make trade-offs between different underground and overhead distribution options.&nbsp; Outputs include, detailed fiber and civil design, bill of materials (with options and specifications) and high-level fiber drop design. The objective is to develop a design of sufficient detail that civil contracts can then be let to physical build the network.</p>\n\n<p>&nbsp;</p>\n\n<p>Also included is the design of network records and provision and other processes to support ongoing network operation.</p>\n\n<p>&nbsp;</p>\n\n<p>The detailed Terms of Reference (TOR) and accompanying documents for the assignment is attached to this REOI.</p>\n\n<p>&nbsp;</p>\n\n<p>The FSMT Cable Corporation and the Department of Finance and Administration now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s <em>Procurement Regulations for IPF Borrowers</em> dated July 2016, revised November 2017 and August 2018 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>&nbsp;</p>\n\n<p>The best qualified firm to carry out the services will be selected in accordance with the Consultant&rsquo;s Qualifications Based Selection (CQS) method set out in the Regulations, and based on the following criteria:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>\n\t\t<ul>\n\t\t\t<li>Experience in designing open access fiber networks that support both GPON and Point to Point services with multiple retail service provider flexibility; and</li>\n\t\t</ul>\n\t\t</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>\n\t\t<ul>\n\t\t\t<li>experience with best practice underground and aerial designs and solutions; and</li>\n\t\t</ul>\n\t\t</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>\n\t\t<ul>\n\t\t\t<li>having existing proven processes and systems that allow rapid design iteration and collaboration with FSMT Cable to determine the optimum design; and</li>\n\t\t</ul>\n\t\t</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>\n\t\t<ul>\n\t\t\t<li>experience in developing inventory and record systems and processes to support the long-term network operation.</li>\n\t\t</ul>\n\t\t</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours (0900 to 1700).</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by 11 May 2020.</p>\n\n<p>&nbsp;</p>\n\n<p>National FTTH Rollout Manager</p>\n\n<p>Mr Peter Garamfel</p>\n\n<p>PO Box 2202, Kolonia, Pohnpei, Federated States of Micronesia, 96941</p>\n\n<p>+691 320 2602</p>\n\n<p>info@fsmcable.com<em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em></p>\n\n<p>www.fsmcable.com</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Attachment: Terms of Reference (TOR)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n\t\t\t<p>FSM FTTH Network Design</p>\n\n\t\t\t<p>terms of reference</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>FM-DOFA-165174-CS-CQS</p>\n\n\t\t\t<p>14 april 2020</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>2.6</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>2020</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table align=\"left\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Summary</li>\n</ol>\n\n<p>Background</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The National Government of the Federated States of Micronesia (FSM), in partnership with the World Bank, has announced its intention to complete an open access fibre to the home network for the main islands of the four states of FSM. This is the cornerstone of the Digital FSM Project which aims to expand access to the internet, promote private sector investment in digital services, and establish the critical foundations for digital government services and the digital economy.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Further information and background to the project is included in the attached High Level Architecture and Assumptions for FSM FTTH Design paper.</li>\n\t\t<li>Financing is in place through a World Bank Project Preparation Advance, which includes financing for the development of plans and designs so that the project is able to start construction and other implementation activities as soon as the project is approved and declared effective.</li>\n\t\t<li>The Federated States of Micronesia Telecommunications Cable Corporation (FSMTCC or FSMT Cable, and sometimes also referred to as the Open Access Entity or OAE) will manage the contract on behalf of the National Government until the Project becomes effective.&nbsp; Upon Project effectiveness the contract will be moved to FSMT Cable. FSMT Cable is the implementing entity for the FTTH activities under the Project and will own and operate the FTTH network.&nbsp;</li>\n\t\t<li>FSMT Cable has decided to break up the FTTH network rollout into separate components for (1) design, (2) materials and (3) civil works. The objective is to get the best mix of international skills and experience for the design of the open access network, and the best mix of civil work experience. These TORs are for the design component, and are expected to provide the necessary inputs to guide the procurement of the materials and civil works components.</li>\n\t\t<li>Chuuk is outside of the scope of this piece of work. Options for a way forward for Chuuk, including FTTH Plans for the inner lagoon islands, will be considered mid 2020. &nbsp;The rollout strategy in Chuuk will also need to be coordinated closely with the planned electricity development project which is being implemented by the Chuuk Power Utility Corporation (CPUC).</li>\n\t\t<li>The general desire is for the core aspects of the network to be underground. This is based on the inherent resiliency of underground infrastructure. The states are at risk from storm damage and the lush vegetation grows fast and is a hazard to overhead deployment. However, underground is not expected everywhere and FSMT Cable is realistic around the extent that they can do underground. The trade-off between underground and overhead is going to be a key decision that FSMT Cable is looking for out of this assignment. The Consultant will be expected to include an assessment and recommendations for design options and forecast climate co-benefits (adaptation and mitigation), including resilience to climate related natural disasters, energy efficiency, GHG emission reductions, etc.</li>\n\t\t<li>Further information on the different states is available in the FSM High Level Architecture and Assumptions paper which should be referenced as part of this design.</li>\n\t\t<li>Yap has been chosen as the initial build State. Yap has good existing civil infrastructure and was recently connected via an international submarine cable for the first time. The total number of households to be connected is also relatively small viz. 2000 households. Starting in Yap allows learnings to be developed and the design tested on a smaller scale than the other states.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Reference Documents</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li>In addition to the detail in this Terms of Reference, the following two attached documents should inform responses:</li>\n\t</ol>\n\t</li>\n\t<li>High Level Architecture and Assumptions for FSM FTTH Design v1.0</li>\n\t<li>Digital Federated States of Micronesia Project Environmental and Social Management Plan v2.0</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Respondents should familiarise themselves with the Reference Documents as they are a material input into the scope of this Terms of Reference.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Future Downstream work</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The successful consultant will be eligible for further downstream work, subject to satisfactory performance and at FSMT Cable&rsquo;s discretion. This could include (but not limited to) work such as further design, training, project supervision or other professional services.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Objective</li>\n</ol>\n\n<p>Purpose</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The purpose of this assignment is to complete the detailed design for the three main islands of the states of Yap, Kosrae and Pohnpei.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>More specifically the purpose of this assignment is to:</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Complete a desktop design that allows FSMT Cable to engage in the trade-offs of different approaches (materials selection / underground vs overhead). This desktop design will allow high level costing estimates for the project. FSMT Cable expects that the successful consultant will be able to rapidly iterate changes to the high level planning assumptions so that they will be able to try different combinations to optimise the FTTH build.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Inform the selection and ordering of materials and any specialist tools or systems to support the build and operation of the network.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Complete detailed civil and fibre design for the three main islands of the states of Yap, Kosrae and Pohnpei that allows for contracts to be let for the civil work to a wider range of civil contractors and design for the fibre build team.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Design the network records and provisioning process (including any recommendation on tools if appropriate; like for example a network inventory system). This is so that FSMT Cable is able to modify the design as it goes through the building phase to take into account the numerous changes that will occur during final construction, extend the network over time and connect and support service provider and end customers. FSMT Cable prefers open standards where possible.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Chuuk is planned as a later extension to this contract. Chuuk should be expected to follow the same high-level architecture as the other three states.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>3 Scope of Services &nbsp;&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The scope of the services contemplated in this Terms of Reference is all the activities and tasks required to design the FSM FTTH network.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The design scope is broken into four separate phases. At each phase the consultant is expected to submit draft materials for review and acceptance by FSMT Cable. FSMT Cable will then provide feedback, clarifications and questions to the Consultant. The process is expected to be iterative. After agreed refinement, the Consultant will then provide the final set of materials for FSMT Cable for final approval.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The phases are designed to overlap and some activity is expected to be concurrent as it relies on different skills and resources. Consultants are invited to consider the phasing and make any recommendations or changes.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The scope is to be completed by the end of 2020.&nbsp; Ongoing, professional services may be required for technical and architectural support past Phase 3 and 4. These would be subject to satisfactory performance and conditional on build commencing.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase 1 Desktop Design for Yap</strong>. This is design work to be completed remotely, with no site visit required. It is assumed that the Consultant will able to be bring a range of tools and processes using the data provided by FSMT Cable.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Communal Network Design:</strong>&nbsp; Design of the FSM FTTH network to meet the architectural requirements covering the address points identified for Yap in Appendix 1. Both an aerial design is requested as well as an underground design, also having regard to pros/cons from a climate co-benefits perspective &ndash; adaptation and mitigation. There is no access to existing duct infrastructure. Underground design is to assume new build using the most appropriate technology applicable including microtrenching and microducts where this is deemed suitable.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Drop Network Design:</strong> This is the design for connecting each individual customer to the network. This is expected to include a limited number of standardized options for connecting each premises, covering both where underground and aerial distribution is used for the communal network.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Specification and cost estimates of volume driven materials</strong>: These will be used to estimate material, civil and other labor driven costs. This should be broken down into:</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Distance driven materials</strong> &ndash; to create an estimate of how much per km?</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>This is cost per metre of material for providing coverage. Examples of this will be microduct cost per metre and the cost of different fibre count cables for use in ducts or ADSS fibre for aerial deployments.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Premises covered driven materials</strong> &ndash; how much to cover x thousand premises and able to be connected?</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>This is the cost of making the network available to end customers. This is for items driven by the number of premises covered. Examples will be CO OFDF sizing, FFP Cabinets, FATs, any materials involved in leaving the network ready to connect in underground scenarios or pole mounted terminals when an aerial topology is used.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Connection related materials</strong> &ndash; how much per connecting customer?</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>These are the consumables used in connecting an end customer to the network. It would include lead in cables or ducts and any materials used to get from the network at the boundary of the premises to the inside of the premises where the service provider connects their ONT. This includes recommended solutions for internal (and/or) external termination points.</p>\n\n<p>&nbsp;</p>\n\n<p>Where different options exist and there are valid trade-offs in the materials these must be made explicit.&nbsp; Materials / components specified shall all meet industry standards and have reference sites. A high-level output sheet is attached in Appendix 3.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Specification and cost estimates of Fibre Specific Tool sets. </strong>The materials identified in (d) are likely to require specific tools. There are two key sets:</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Tools for the building of the communal / core network</strong>. This is expected to include tools for splicing fibre, tools required for blowing fibre in main feeder and core routes (if applicable) and recommended test tools for qualifying fibre loss. These tools would also be the tools expected to be used to maintain the communal / core network.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Tools for the connection of individual customers to the network</strong>. This is expected to include fibre splicing tools if fibre splicing is required to connect a customer, any tools for supporting airblown fibre, any specific connectors related tools and any fibre testing tools.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>A high-level output sheet is attached in Appendix 3.</p>\n\n<p><strong>Phase 2 Expanding the Desktop Design</strong></p>\n\n<ol>\n\t<li><strong>Desktop design for Kosrae and Pohnpei. </strong>Once FSMT Cable has accepted the desktop design and costing estimates for Yap then the same design principles should be used to compete a desktop study for Kosrae and Pohnpei. No travel should be required to complete this step. A key output of this stage is a bill of materials that can be used for the entire project.</li>\n</ol>\n\n<p><strong>Phase 3 Detailed design for each State </strong></p>\n\n<ol>\n\t<li><strong>Detailed design for Yap</strong>. This is to produce detailed designs for Yap that can then be contracted out to civil build organisations and instruct the fibre build team. This is expected to require a visit to Yap to survey and make pragmatic changes to the desktop design. The Consultant should be aware that the FTTH rollout for Yap is the first priority. The detailed design work for Yap should start as soon as the Phase 1 work has been accepted by FSMT Cable. This may mean that the Yap detailed design (phase 3) starts before or concurrently with desktop design work for Pohnpei and/or Kosrae (phase 2).</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Detailed design for Pohnpei</strong>. As for Yap.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Detailed design for Kosrae. </strong>As above for Yap.</li>\n</ol>\n\n<p><strong>Phase 4 Supporting Design (subject to Project effectiveness)</strong></p>\n\n<ol>\n\t<li><strong>Design of Network Records, Provisioning Processes and Support Processes.</strong> This is the design and specification of the network records schema, recording process for the as built records and any system specification. The provisioning and support processes are the documented steps and processes that FSMT Cable will use to connect and support end customers onto the network. This includes single dwelling premises as well as network extensions to support small communities, campuses and multi-dwelling units.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>It is expected that the records systems (network inventory system) would be populated with the design constructed in the earlier phases and would be able to be updated and kept current by FSMT Cable through the build and the life of the network. FSMT Cable prefers open standards-based systems and approaches where possible.</p>\n\n<p>&nbsp;</p>\n\n<p>This phase should include recommendations on tool sets where consistent with best practice for electronically recording as built networks and network changes.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Plan summary and initial timing assumptions:</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:140.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Phase</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Comments</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p><strong>Expected Duration</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p><strong>Expected Resources</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:52.9pt\">\n\t\t\t<p>Kick off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Programme Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Agreed as part of Contract / RFP</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Program Manager</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"3\" style=\"height:29.4pt; vertical-align:top; width:52.9pt\">\n\t\t\t<p><strong>Phase 1</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Yap Desktop</strong></p>\n\n\t\t\t<p><strong>Design</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Draft Desktop Design for Yap (a-d)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>To start iteration with FSMT Cable. High level drafts of all Phase 1 Deliverables.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2-3 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Architect</p>\n\n\t\t\t<p>/ Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Iteration</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Expect questions and reconfigurations of high level drafts.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2-3 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Architect</p>\n\n\t\t\t<p>/ Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:30.15pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Final Documents and deliverables for Phase 1 (a-d)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.15pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Final Desktop design for Yap.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.15pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.15pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:29.4pt; vertical-align:top; width:52.9pt\">\n\t\t\t<p><strong>Phase 2</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Wider Desktop Design</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:29.4pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Desktop design for Kosrae and Pohnpei (e)</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Based on assumptions signed off on June 29. Draft ready for questions / sign off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Signed off Bill of Materials for three states for FSM</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>1 week</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"12\" style=\"height:9.05pt; vertical-align:top; width:52.9pt\">\n\t\t\t<p><strong>Phase 3</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Detailed design for each state</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"4\" style=\"height:9.05pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Detailed Design for Yap (f)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.05pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Plan for approach signed off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.05pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.05pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Program Manager</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Planning resources in country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Detailed designs presented for sign off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Signed off by FSMT Cable</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>1 week</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"4\" style=\"height:9.8pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Detailed Design for Pohnpei (g)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Plan for approach signed off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Program Manager</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Planning resources in country&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>4 &nbsp;weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Detailed designs presented for sign off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>3 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.35pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Signed off by FSMT Cable</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>1 week</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.8pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"4\" style=\"height:10.55pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Detailed Design for Kosrae (h)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Plan for approach signed off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Program Manager</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Planning resources in country&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Detailed designs presented for sign off</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Network Planner</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Signed off by FSMT Cable</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>1 week</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:10.55pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:19.6pt; vertical-align:top; width:52.9pt\">\n\t\t\t<p><strong>Phase 4</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Supporting Design</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:19.6pt; vertical-align:top; width:87.6pt\">\n\t\t\t<p>Network Records and Provisioning Design (i)</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>High level records schema and provisioning approach.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>2 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Architect/ Business Analyst</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:129.7pt\">\n\t\t\t<p>Finalised documents and processes</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:55.85pt\">\n\t\t\t<p>4 weeks</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.4pt; vertical-align:top; width:81.05pt\">\n\t\t\t<p>Architect/ Business Analyst</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>4. Deliverables, Timing and Administrative Arrangements</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>This is a deliverable based lump sum payment project.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Report / Output</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Due Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p><strong>Milestone payment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Signing of Contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>Contract Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Deliverable 1</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Desktop Design for Yap Agreed (completion of Phase 1)</li>\n\t\t\t\t<li>Plan for approach of detailed design to Yap (component of Phase 3)</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Contract Signature</p>\n\n\t\t\t<p>+ 1 month</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Deliverable 2</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Desktop Design for Kosrae and Pohnpei Agreed and full bill of materials for the three in scope states completed (completion of Phase 2)</li>\n\t\t\t\t<li>High level records schema and provisioning approach (interim component of Phase 4)</li>\n\t\t\t\t<li>Detailed Design for Yap completed and accepted (component of Phase 3)</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Contract Signature</p>\n\n\t\t\t<p>+ 2 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Deliverable 3</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Finalised documents and processes accepted for records schema, provisioning and supporting processes and tools (completion of Phase 4).</li>\n\t\t\t\t<li>Plan for approach of detailed design of Kosrae accepted (component of Phase 3)</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Contract Signature</p>\n\n\t\t\t<p>+ 3 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Deliverable 4</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Kosrae Detailed Design completed and accepted (component of Phase 3</li>\n\t\t\t\t<li>Plan for approach of detailed design for Pohnpei accepted (component of Phase 3)</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Contract Signature</p>\n\n\t\t\t<p>+ 4.5 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:276.4pt\">\n\t\t\t<p>Deliverable 5</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Pohnpei Detailed Design completed and accepted (completion of Phase 3)</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Contract signature</p>\n\n\t\t\t<p>+ 6 months</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:60.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The Consultant will be expected to commence work within one week of contract signature.</li>\n\t\t<li>Drafts of all deliverables shall be provided to FSMT Cable and the World Bank for review before they are finalised and accepted.&nbsp;</li>\n\t\t<li>FSMT Cable will use best efforts to respond no later than 5 working days after submission of each draft to enable efficient progress of the Consultant&rsquo;s work.&nbsp; The Consultant shall submit draft reports to FSMT Cable, with a copy to the World Bank, for review at least 5 days prior to the deadline for each deliverable.</li>\n\t\t<li>The Consultant will be required to submit a formal timetable for activities, reports and deliverables in conjunction with, or prior to the first deliverable.&nbsp; This assignment is expected to require approximately 320 non-consecutive days of work.&nbsp; Included in these days of work are an expected total of three, two person, visits to FSM (i.e. a visit to survey each state). This is expected to be two-week visits for Yap, and Kosrae. Because of its bigger size, Pohnpei is expected to require up to a four week visit.</li>\n\t\t<li>The Consultant will report to the FSMT Cable.&nbsp; Daily supervision and guidance will be provided by Mr Peter Garamfel, National FTTH Rollout Manager assisted by Mr Mike Lott, advisor to the FSMT Cable on this project.</li>\n\t\t<li>The Consultant shall immediately advise FSMT Cable of any direct or indirect financial interest or other enduring professional relationship which might reasonably be seen to affect the impartiality of his or her advice to FSMT Cable under this assignment.</li>\n\t\t<li>The end date for this assignment shall be 31 December 2020, unless extended by mutual agreement and subject to satisfactory performance.</li>\n\t\t<li>Given the current level of global uncertainty regarding travel and safety, the travel commitments and any tasks requiring a domestic presence in the FSM referenced in these TOR will be treated as flexible.&nbsp; Where needed, the Consultant and FSMT Cable will agree in good faith the most appropriate arrangement to give effect to the Services outlined in the TOR.&nbsp; For example, an alternative arrangement may include increased use of video-conferencing services. If the prospect of a visit emerges during the term of the contract the parties will negotiate suitability and cost at that time.</li>\n\t\t<li>FSMT Cable will make available key GIS information to the Consultant for use in planning the network. The primary data will be the outside plant and customer meter locations for the four state utility companies.&nbsp; End premises with mains power is being used as the primary indicator to decide whether a premise is to have fiber planned.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Other sources of data may be available. FMST Cable will assist in acquiring additional data.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>5 Consultant qualifications</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The selected Consultant is expected to be a firm or association of firms.&nbsp; The selected Consultant should have a minimum of five years&rsquo; experience in designing fiber networks, in the following key attributes:</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Experience in open access networks that support both GPON and Point to Point services and multiple service providers.</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>Minimum requirements:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Minimum of five years of relevant network design experience that has included the following:\n\t<ul>\n\t\t<li>High level design of all outside plant physical network for FTTH access networks; and</li>\n\t\t<li>Physical design of Central Office, aggregation and transport fiber design; and</li>\n\t\t<li>Fiber drop design and options for different building and access approaches (aerial, underground).</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>In addition, the following demonstratable experience(s) and capabilities are desirable:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Fiber deployments where both point to point and GPON services are delivered through the same infrastructure.</li>\n\t<li>Design of networks that supporting multiple service providers. This is where multiple layer 2 operators are provided for in the design and operations.</li>\n\t<li>Extending past design and into network build (e.g. project experience of building their own design).</li>\n\t<li>Operational support of networks for connecting and maintaining end customers (i.e. providing day to day operations support for networks that they have designed).</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Experience with best practice underground and aerial designs and solutions</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>Minimum requirements:</em></p>\n\n<p>&nbsp;</p>\n\n<p>Demonstrated experience in:</p>\n\n<ul>\n\t<li>specifying rapid trenching technologies and associated systems and materials; and</li>\n\t<li>experience in both air blown and fixed fiber; and</li>\n\t<li>alternative options for aerial fiber distribution, including connectorized options; and</li>\n\t<li>specifying different hardware options and alternatives for cabinets and enclosures.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>In addition, the following demonstratable experience(s) and capabilities are desirable:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Practices and approaches that have successfully worked in low craft skill civil and fiber network construction including balancing the total cost differences between approaches.</li>\n\t<li>Small-scale network operator environment and the challenges that relate to network technology selection.</li>\n\t<li>Rural and small-town network planning where a mixed approach is required.</li>\n\t<li>Balancing best practice network requirements within set environmental and social guidelines.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Processes and systems that allow rapid design iteration and collaboration with FSMT Cable to determine the optimum design.</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>Minimum requirements:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Experience with appropriate planning and GIS tools suited to FSMT Cable&rsquo;s scale and open access business requirements; and</li>\n\t<li>Experience in delivering design artefacts (eg. Designs, Bills of Materials, etc) to clients that are then able to be used by multiple parties to then build the network. Eg; the specific designs for civil contractors to physically build network ducts and for separate fiber build crews to deploy and connect core network fibers.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>In addition, the following demonstratable experience(s) and capabilities are desirable:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Integration with previous clients to improve high level design based on learnings developed through the planning process.</li>\n\t<li>Experience in working to support assignments in the Pacific or similar Small Island Developing State to FSM.</li>\n\t<li>Experience in delivering on remote assignments, where travel and co-location is not possible.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Developing inventory and record systems and processes to support the long-term network operation</strong>.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><em>Minimum requirements:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Demonstrable experience in specifying and documenting processes associated with fiber support systems and processes used for provisioning and maintaining FTTH networks.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><em>In addition, the following demonstratable experience(s) and capabilities are desirable:</em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Ability to leverage existing processes and approaches from firm&rsquo;s experience in supporting network build and network operations.</li>\n</ul>\n\n<ul>\n\t<li>Small scale, IT &ldquo;light&rdquo; practices where sophisticated systems and approaches are not practical.</li>\n\t<li>Delivering training and support materials where English skills are poor or limited.</li>\n\t<li>Day to day operational support of FTTH networks.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The following will form part of the instructions to the shortlisted consultant to address, once shortlisted, as part of their technical proposal. It is included in the Terms of Reference to enable consultants to understand what will be required of the shortlisted consultant.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The Consultant should include their proposed methodology and approach to the assignment as well as a high level workplan as to how it would address the items in scope. The Consultant should feel free to suggest alternatives to the draft plan in 3.6.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The Consultant shall include the following key personnel in the proposal.&nbsp; One member of the team may demonstrate experience relating to more than one of the positions described below.&nbsp; Evaluation will be based on how the key personnel in aggregate satisfy the requirements.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>Network Architect / Chief Designer, with relevant qualifications from a recognized institution, and at least 10 years of relevant experience relating to network design.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Experience in the following:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li>Successfully leading a network design assignment; and</li>\n\t\t\t\t<li>High level design of all outside plant physical network and inventory for FTTH network access networks; and</li>\n\t\t\t\t<li>Physical design of Central Office, aggregation and transport fiber; and</li>\n\t\t\t\t<li>systems and process for supporting the provisioning and maintenance of FTTH networks; and</li>\n\t\t\t\t<li>in a small-scale network operator environment; and</li>\n\t\t\t\t<li>balancing best practice network requirements within set environmental and social guidelines; and</li>\n\t\t\t\t<li>practices and approaches that work for low craft skill civil and fiber network construction is desirable.</li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t\t<li>Network Planner(s), with at least five years of relevant experience in planning underground and aerial FTTH networks.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Experience in relation to:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li>rural and small-town network planning; and</li>\n\t\t\t\t<li>familiarity with appropriate planning and GIS tools suited to FSMT Cables scale and requirements; and</li>\n\t\t\t\t<li>close integration with architect/designer to improve high level design based in learnings developed through the planning processes; and</li>\n\t\t\t\t<li>working in a small-scale network operator environment; and</li>\n\t\t\t\t<li>Remote working with third parties and different network operators is desirable.</li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t\t<li>Business Analyst with at least five years of relevant experience in specifying and documenting processes associated with fiber support systems and processes used for provisioning and maintaining FTTH networks.</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Experience in relation to:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li>Small scale, IT &ldquo;light&rdquo; practices where sophisticated systems and approaches are not practical; and</li>\n\t\t\t\t<li>experience of day to day operational support of FTTH networks; and</li>\n\t\t\t\t<li>communicating (oral and written) in a manner suitable for non-expert decision makers; and</li>\n\t\t\t\t<li>working remotely as part of a wider team; and</li>\n\t\t\t\t<li>existing experiences and processes that can be leveraged is desirable.</li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t\t<li>One of the key personnel shall be designated the Team Leader and will be responsible for coordinating and ensuring the delivery of this assignment.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Appendix 1 &ndash; Premise counts</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Key statistics for Yap main island:</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>2010 Census Count of Homes</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>1,680</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>Only residential properties counted</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>Count of Open Street Maps Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>1,927</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>Higher as incudes non-residential, and includes out-buildings, but satellite based analysis means that a number of buildings have not been counted as they were obscured.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>Count of Electricity Meter Points</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>1,874</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>Starting assumption for desktop based planning. Correlation with request for electricity and broadband is high.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>Count of Modelled Buildings from Pacific Geo</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>1,600</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>Rough approximation.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>Main Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>47 km</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:161.85pt\">\n\t\t\t<p>Secondary Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:142.95pt\">\n\t\t\t<p>113 km</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:145.7pt\">\n\t\t\t<p>Note that this includes paths and tracks</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Key statistics for Pohnpei Main Island</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>2010 Census Count of Homes</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>5,970</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Only residential properties counted</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Open Street Maps Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>2,716</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Missing large portion</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Electricity Meter Points</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>5,159 (2010 census houses with power)</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>To update with actuals from Utility</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Recommended starting assumption for desktop based planning. Correlation with request for electricity and broadband is high.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Modelled Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>9,465</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Rough approximation</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Main Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>80 km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>The main ring around the island</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Secondary Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>251 km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Includes the streets of Kolonia and the inland roads and tracks.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Key statistics for Kosrae</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>2010 Census Count of Homes</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>1,143</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Only residential properties counted</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Open Street Maps Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>641</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Missing large portion</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Electricity Meter Points</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>1,079 (2010 census houses with power)</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>To update with actuals from Utility</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Recommended starting assumption for desktop based planning. Correlation with request for electricity and broadband is high.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Modelled Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>426</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Missing large portion</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Main Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>44 km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Secondary Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>34 km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Key statistics for Chuuk lagoon [not included within scope of work]</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>2010 Census Count of Homes</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>5,444</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Only residential properties counted</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Open Street Maps Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>8,629</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Higher as incudes non-residential, and includes out-buildings, but satellite based starting point will miss some</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Electricity Meter Points</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>To be updated</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Work assumed to be completed at the same time as electricity build on islands of Inner Lagoon</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Count of Modelled Buildings</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>5,442</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Rough approximation</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Main Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>13km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>All in Weno</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:168.4pt\">\n\t\t\t<p>Secondary Roads</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>96 km</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.55pt\">\n\t\t\t<p>Except for Weno, they are all pedestrian paths and tracks</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Appendix 2 &ndash; Data files to support the design available</p>\n\n<p>&nbsp;</p>\n\n<p>Files available:</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>1. Yap State Public Services Corporation Electricity Network. This will be obtained for the other three states.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Provides meter locations, poles, aerial and routes. This is the best source of data. Meter locations are the best proxy for fibre demand.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>2. FSM Telecom network nodes</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Locations of Central Office, xDSL cabinets and Mobile sites. These will be demand points and given an example of existing network aggregation points.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>3. Pacific Geo &ndash; FM Point Building Exposure Modelled</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Data from PacGeo site on modelled building replacements across FSM[1]. For information purposes only.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>4. FSM School locations</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Locations of Schools across FSM.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>5. Yap, Kosrea, Pohnepi and Chuuk Photos</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Geotagged photos from November 2019 and January 2020 visits. To give a general impression of infrastructure and environment.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>6. Open Street Map Buildings for the main islands of each state</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Shape file of OSM buildings. These are for information only. They are representative, not definitive.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>7. Open Street Map Roads for the main islands of each state</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.25pt\">\n\t\t\t<p>Shape file of OSM roads. In Yap they have been classified as to sealed vs unsealed.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Sample of YSPSC network data showing infrastructure in Colonia modelled in QGIS:</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Appendix 3 &ndash; Outputs from Phase 1</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>[1] http://www.pacgeo.org/layers/geonode:fm_bldexp_modelled/metadata_detail</p>\n\n<p>&nbsp;</p>"},{"id":"OP00085050","notice_type":"Request for Expression of Interest","noticedate":"25-Feb-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-03-09T00:00:00Z","submission_deadline_time":"05:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P163399","project_name":"East Africa Skills for Transformation and Regional Integration Project (EASTRIP)","bid_reference_no":"FTVET/QCBS/C/01/2011","bid_description":"Consultancy Services for Design and Supervision of the Construction of Classrooms, Workshops and Dormitories","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Addis Ababa","contact_ctry_name":"Ethiopia","contact_email":"habtilo@gmail.com","contact_name":"Haftom Gebregziabher","contact_organization":"Federal Vocational and Technical Education and Training Institute","contact_phone_no":"251 911 566555","submission_date":"2020-02-25T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES&ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>ETHIOPIA</em></strong></p>\n\n<p>East Africa Skills for Transformation and Regional Integration Project (EASTRIP)</p>\n\n<p>Loan No./Credit No./Grant No.: <strong>Credit No. 6335-ET and Grant No. D395-ET</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title: </strong>Consultancy Services for Detail Engineering Design, Construction Supervision and Contract Administration of Construction Works at Federal TVET Institute.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No:</strong> <strong>FTVET/QCBS/C/01/2011</strong></p>\n\n<p>The initiative of the Ethiopian Government has secured financing support from the World Bank under the EASTRIP to strengthen selected TVET colleges to become Centres of Excellence for high quality skills training and development in selected priority sectors. One of the selected beneficiaries is the Federal TVET Institute to establish a Centres of Excellence for Precision Tool&amp;DieMaking and Leather and Leather Products&rdquo;, and intends to apply part of the proceeds for Consulting Services.</p>\n\n<p>Accordingly, Federal Technical and Vocational Education and Training Institute on behalf of the Federal Democratic Republic of Ethiopia has planned to engage a consultant to provide services for a Preparatory works for construction of additional facilities in the Institute&rsquo;s campus, that is,&nbsp;<strong><u>Detailed Designs, Working Drawings and Contract Procurement documents for the construction of the new facilities, including Supervision and Contract Administration during the construction phase.</u></strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>The Consulting Services include:</strong></p>\n\n<ol>\n\t<li><strong>Phase I (Detailed Architectural and Engineering Designs &amp; Preparation of Tender Document)</strong></li>\n\t<li><strong>Phase II Construction Supervision and Contracts Administration</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>The consulting firm is required:</strong></p>\n\n<p><strong>Phase I (Detailed Architectural and Engineering Designs &amp; Preparation of Tender Document)</strong></p>\n\n<p>The consultant is required to:</p>\n\n<ul>\n\t<li>Carry out the detailed Design on architectural, structural, sanitary, Mechanical and Electrical, landscape, and recreation areas with the required statistical analysis considering environmental and social Aspects.</li>\n\t<li>Prepare the detailed construction drawings, floor plans, elevations and sections to their standard scale with technical specifications, Bill of quantity (BOQ) and Engineer&rsquo;s Cost Estimate.</li>\n\t<li>Prepare final and Complete Tender Documents.</li>\n</ul>\n\n<p><strong>Phase II (Construction Supervision)</strong></p>\n\n<p>The consultant is required to:</p>\n\n<ul>\n\t<li>Ensure that the building is constructed in accordance with the technical&nbsp; specification, engineering drawings or any amendments thereto provided and meet the standard quality of the end product;</li>\n\t<li>Optimize the use of available material resources to minimize costs to the client, to maximize the quality of the works, to expedite construction and to optimize the use of natural resources and ensure environmentally as well as socially sustainable construction; and</li>\n\t<li>Ensure that the building is constructed within the contract price and time for completion allowed under the contract or any agreed amendments thereto.&rdquo;</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include all services necessary to prepare a detailed design and associated drawings for the Institute facilities, infrastructure, landscape and, recreation and greenery areas based on standards of Flagship TVET institute in addition to preparation of all bidding documents that will allow launch of a tender following World Bank procedure. The Consultant shall carry out all the services required for the Contracts Administration and Construction Supervision during the construction phase. The contract duration in total is 24 months (4 months for Phase &ndash; I Detail Engineering and 20 months of construction Supervision &ndash; including one month input for defects liability period). The estimated staff man-month of the service is 96 man-months in all Phases. The assignment for Phase &ndash;I is expected to commence in March 2020.</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment can be obtained at the address given below:</p>\n\n<ul>\n\t<li>Federal Technical and Vocational Education and Training Instituteof Property and Procurement Administration Directorate: - Contact Person: <strong>Mr. DemisewBeyene</strong> Mobile Phone: +251911015748;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; e-mail:demisb12@gmail.com;</li>\n</ul>\n\n<p>Website: - www.ftveti.edu.et</p>\n\n<ul>\n\t<li>Addis Ababa, Sub-City Yeka, ( Near Lambert North Bus Station)</li>\n\t<li>Contact Person: <strong>Mr. Haftom Gebregziabher</strong><strong>(Deputy Director General for Academics)</strong>&ndash; Mobile Phone: +251911566555; e-mail: habtilo@gmail.com</li>\n\t<li>☎+251116 4644 55 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fax/ፋክስ +251116465675/78</li>\n\t<li>ፖስታ 190310 E-mail tvetinstitute@yahoo.com</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The Federal Technical and Vocational Education and Training Institutenow invites eligible consulting firms(&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultantsshould provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.The shortlisting criteria are: core business and years in business, qualifications in the field of the assignment, technical and managerial organization of the firm. Availability of key staff and appropriate qualification,relevant experience of the firm in similar assignment, experience of the firm in similar conditions.</p>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs,3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Borrower.</p>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a jointventure and/or asub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>&nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Selectionmethodset out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours:</p>\n\n<p><strong>Monday to Friday: 9:00 AM &ndash; 12:00 AM and 1:30 PM &ndash; 5:00 PM</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) after floating this bid within <strong>Ten (10)</strong> working days to:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Federal Technical and Vocational Education and Training Instituteof Property and Procurement Administration Directorate: - Contact Person: <strong>Mr. Demisew Beyene</strong> Mobile Phone: +251911015748;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; e-mail:demisb12@gmail.com;</li>\n</ul>\n\n<p>Website: - www.ftveti.edu.et</p>\n\n<ul>\n\t<li>Addis Ababa, Sub-City Yeka, ( Near Lambert North Bus Station)</li>\n\t<li>Contact Person: <strong>Mr. Haftom Gebregziabher</strong><strong>(Deputy Director General for Academics)</strong>&ndash; Mobile Phone: +251911566555; e-mail: habtilo@gmail.com</li>\n\t<li>☎+251116 4644 55 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fax/ፋክስ +251116465675/78</li>\n\t<li>ፖስታ 190310 E-mail tvetinstitute@yahoo.com</li>\n</ul>\n\n<p><strong>Federal Technical and Vocational Education and Training Institute</strong></p>\n\n<p><strong>Addis Ababa</strong></p>\n\n<p><strong>Ethiopia</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>Ministry of Science and Higher Education</strong></p>\n\n\t\t\t<p><strong>Federal Technical and Vocational Education and Training Institute</strong></p>\n\n\t\t\t<p><strong>East Africa Skills for Transformation and Regional Integration Project (EASTRIP) </strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Ethiopia</strong></p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Centre of Excellence for Precision Tool and Die Making </strong></p>\n\n\t\t\t<p><strong>&nbsp;and</strong></p>\n\n\t\t\t<p><strong>Leather and Leather Products</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>TERMS OF REFERENCE (ToR</strong><strong>)</strong></p>\n\n\t\t\t<p><strong>ASSIGNMENT TITLE: </strong>Consultancy Services for Detail Engineering Design, Construction Supervision and Contract Administration of Construction Works at Federal TVET Institute.</p>\n\n\t\t\t<p>Project Name:East Africa Skills for Transformation and Regional Integration Project (EASTRIP)</p>\n\n\t\t\t<p>Project ID :P163399</p>\n\n\t\t\t<p><u>Date of Issues of the ToR</u>:</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Address:The Federal Technical and Vocational Education and Training Institute Addis Ababa, Sub-City Yeka, (Near Lambert North Bus Station)</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Office Telephone: 011 116465689 / 011 6464455, Fax:&nbsp; 011 6465675; P.O.Box: 190310;</strong></p>\n\n\t\t\t<p><strong>Contact Person: Mr. HaftomGebregziabher (Deputy Director General for Academics) </strong></p>\n\n\t\t\t<p><strong>Mobile Phone: +251911566555 </strong></p>\n\n\t\t\t<p><strong>E-mail: habtilo@gmail.co</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>ADDIS ABABA, ETHIOPIA</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Contents</strong></p>\n\n<p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Introduction. 1</p>\n\n<p>1.1....... Background. 1</p>\n\n<p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The objective of the Services. 1</p>\n\n<p>2.1....... Phase I (Detailed Architectural and Engineering Designs &amp; Preparation of Tender Document)&nbsp; 2</p>\n\n<p>2.2....... Phase II (Construction Supervision). 2</p>\n\n<p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of the Service. 3</p>\n\n<p>3.1....... General 3</p>\n\n<p>3.2....... Phase I: -Detailed Architectural and Engineering Designs and Tender Document preparation&nbsp;&nbsp; 3</p>\n\n<p>3.2.1... Design Standards. 3</p>\n\n<p>3.2.2... Topographical Survey. 3</p>\n\n<p>3.2.3... Preliminary Design, Working Design and Working Documents. 4</p>\n\n<p>3.3....... Phase II: -Construction Supervision. 17</p>\n\n<p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Deliverables. 20</p>\n\n<p>4.1....... Type &amp; Content. 20</p>\n\n<p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Team Composition. 21</p>\n\n<p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Selection criteria. 28</p>\n\n<p>6.1....... Average Annual turn over. 28</p>\n\n<p>6.2....... Qualifications and competence of the key professional staff engaged in the consultancy service: 28</p>\n\n<p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Assignment Period. 29</p>\n\n<p>7.1....... Phase-I 29</p>\n\n<p>7.2....... Phase- II 29</p>\n\n<p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Facilities, Services, and Resources to be provided by Procuring Entity. 30</p>\n\n<p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Additional Responsibilities of the Consultant. 30</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Introduction</strong></li>\n</ol>\n\n<p>The World Bank is financing the establishment and implementation of an East Africa Skills for Transformation and Regional Integration Project (EASTRIP), which initially involves Ethiopia, Kenya, and Tanzania from East Africa. It aims to improve the quality of TVET programs and increase accessibility that will support regional integration and the skilled workers need of the economic corridors.</p>\n\n<p>The initiative of the Ethiopian Government has secured financing support from the World Bank under the EASTRIP to strengthen selected TVET colleges to become Centres of Excellence for high quality skills training and development in selected priority sectors. One of the selected beneficiaries is the Federal TVET Institute to establish a Centres of Excellence for Precision Tool Making and Leather and Leather Products&rdquo;.</p>\n\n<p>Relative to this, the Federal TVET Institute two centres of excellence planned and prepared this terms of reference to engage various consultants that can provide technical services for detailed design,supervision and contract administration for construction of additional facilities/infrastructure in the Federal TVET Institute, Addis Ababa campus.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Background</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Federal TVET Institute has prepared a five-year Strategic Investment Plan (SIP) for Centres of Excellence in Precision Tool Making and Leather and Leather Products in order to provide quality environment and services to internal and external clients. Part of the component plan is to build new building that will include workshop and laboratory facilities, lecture rooms, library, cafeteria, offices, ICT room, first aid emergency room as well as dormitory building &amp; guesthouse. It also includes development of sports field facilities, internal access roads, sewerage/drainage, and vehicle parking area.</p>\n\n<ol>\n\t<li><strong>The objective of the Services</strong></li>\n</ol>\n\n<p>The objective of engaging the services of the consultants is to ensure quality and timely implementation of the programs and activities of the project particularly in developing detailed designs, working drawings and contract procurement documents for the construction of the new facilities, supervision and contract administration during the project construction phase.</p>\n\n<p>The objective of the consultancy services is ensuring a good and timely implementation of the activities related to developing Detailed Designs, Working Drawings and Contract Procurement documents for the construction of the new facilities, including Supervision and Contract Administration during the construction phase.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase I (Detailed Architectural and Engineering Designs &amp; Preparation of Tender Document)</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The consultant is required to:</p>\n\n<p>Carry out the detailed architectural, structural, sanitary, Mechanical and electrical Designs with the required statistical analysis and calculations.</p>\n\n<p>Prepare the detailed construction drawings, floor plans, elevations and sections to their standard scale with technical specifications, Bill of quantity (BOQ) and Engineer&rsquo;s Cost Estimate (ECE).</p>\n\n<p>Prepare final and Complete Tender Documents</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase II (Construction Supervision)</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The consultant is required to:</p>\n\n<p>Ensure that the building is constructed in accordance with the technical&nbsp; specification, engineering drawings or any amendments thereto provided and meet the standard quality of the end product;</p>\n\n<p>Optimize the use of available material resources to minimize costs to the client, to maximize the quality of the works, to expedite construction and to optimize the use of natural resources and ensure environmentally as well as socially sustainable construction; and</p>\n\n<p>Ensure that the building is constructed within the contract price and time for completion allowed under the contract or any agreed amendments thereto.&rdquo;</p>\n\n<ol>\n\t<li><strong>Scope of the Service</strong>\n\n\t<ol>\n\t\t<li><strong>General</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Consultant will perform all services necessary to prepare a detailed design and associated drawings for the college facility in addition to the preparation of all bidding documents that will allow the launch of tender following World Bank procurement procedures. The following outlines the typical facilities and requirements for the design of the building and facilities. Specifics on facilities and associated requirements are subject to change. There is an overriding requirement for practical, realistic and appropriate designs that will provide straightforward construction with durable and maintenance free buildings.</p>\n\n<p>The scope of the services shall include all the services necessary to achieve the objectives described under Section 2 above; and in so doing, the consultant shall expeditiously execute, not less than, the following services:</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase I: -Detailed Architectural and Engineering Designs and Tender Document preparation</strong>\n\n\t\t<ol>\n\t\t\t<li><strong>Design Standards</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Consultant shall assess all available design standards including any recommended and appropriate standard for the design of the required building and submits to the client with the justification for approval.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Topographical Survey</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Consultant shall carry out all topographic surveys, site investigations and foundation investigations, utilities and associated services as necessary and determine the sufficiency of the information to design all building structures, site drainage, services, and accesses.</p>\n\n<p>The Consultant&rsquo;s proposals and the survey program shall be clearly proposed in their tender. A Provisional Sum shall be identified to carry out a comprehensive ground investigation, factual and interpretive report, including foundation designs.All benchmarks established by the Consultant during the design stage shall be constructed in a robust manner to ensure that these are available at the commencement of the construction works.</p>\n\n<p>Any survey must have a plotted scale of 1:500 with contours at 0.2-meter intervals for building/structural works.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Preliminary Design, Working Design and Working Documents</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The envisaged services at the preliminary design stage are:</p>\n\n<p><strong><em>Architectural and Structural Design</em></strong></p>\n\n<p>The Consultant will design the foundations for the buildings, roads, and facilities appropriate for their intended functions, and shall include in the design any measures to improve the founding conditions as may be deemed necessary.</p>\n\n<p>&nbsp;The consultants should discuss the building requirements with all key project stakeholders including Federal TVET Institute, Addis Ababa and the local planning authorities in order to confirm provision and arrangement of building facilities.</p>\n\n<p>The design of the buildings must be in accordance with all current and relevant requirements and regulations in force in the Democratic Republic of Ethiopia that govern Civil, Structural, Mechanical or Electrical Works. Backup power systems are required.</p>\n\n<p>Creativity and innovations are emphasize to deliver worldclass Centre with distinctive features. Use of recycled materials is encouraged, where its economical.</p>\n\n<p>The consultant will be required to obtain all necessary construction permissions and must ensure that constructed facilities adequately provide access for disabled persons.</p>\n\n<p><strong><em>Associated Civil and Drainage Works Design</em></strong></p>\n\n<p>The Consultant is required to carry out all necessary studies and designs for associated civil and drainage works including septic tank and must carry out a check of all existing culverts, side drains, and other drainage systems and prepare the improved drainage designs as required.</p>\n\n<p>The Consultant in consultation with Federal TVET Institute, Addis Ababa and representatives of the Addis Ababa city administration construction Bureau, incorporate shall design measures regarding health, safety, and environmental protection, and will introduce appropriate and agreed measures into the design of the external civil and drainage works, andnecessary drainage and effluent requirements may be needed for the laboratories. The Consultant will prepare layouts with levels and schedules for the construction options for access pavement roads and parking areas, drainage, location of the back-up generator and all associated and necessary structures. The Consultant will prepare detailed layouts and drawings for any drainage structures (either new or replacement) required.</p>\n\n<p><strong><em>IT, Mechanical and Electrical Design</em></strong></p>\n\n<p>The designs of facilities must concur with appropriate international standards in line with the objective of establishing aworld class Centres of excellence. All professional, technical and administrative buildings/offices/accommodation will be supplied with unlimited internet access and have full access to data storage, library, standards, and associated facilities. All meeting rooms will have access to computer presentation facilities and video/tele conferencing facilities. Laboratories and Workshops will be supplied with specialist features such as exhaust/extractors, hydraulics, and high-pressure gas/water.&nbsp; The conference building will house State-of-the-Art facilities.</p>\n\n<p><strong><em>Environmental and Social Aspects</em></strong></p>\n\n<p>The Consultant is required to consider the nature and type of environmental impact on the physical features and local socio-economy. This assessment will include all direct and indirect, short term and long term, local and strategic, adverse and beneficial, reversible and irreversible, quantitative and qualitative, actual and perceived and impacts and effects of the site development.</p>\n\n<p>The Consultant will take account of construction equipment noise and safety; visual impact (obstruction and intrusion); air pollution; any community severance; ecological impacts; disruption due to construction; pedestrians and cyclists; the view from the building; and community stress. The consultant will prepare a schedule of environmental mitigation measures with checklists for inclusion of specification clauses for the works tender.</p>\n\n<p>The Consultant will allow for environmental monitoring by the Supervisor during the works. This will be done through an environmental management plan prepared by the Consultant at the start of the works. It shall also be the responsibility of the Consultant to conduct environmental audits.</p>\n\n<p>The Consultant will advise on any matter pertaining to social aspects and impacts taking into account all current government requirements. Due consideration should be given to impacts on disadvantaged groups, employment opportunities, community participation in works, and the like.</p>\n\n<p><strong><em>Sustainability Aspects</em></strong></p>\n\n<p>The consultant will use local and national materials and crafts where practical and economic and include natural ventilation and heating, where possible. Creativity and innovation on technologies for construction and facilities are encouraged.</p>\n\n<p>Use of renewable energy and natural energy is encouraged, including wind and solar power, where economic.</p>\n\n<p><strong><em>Presentation and Technical Audit</em></strong></p>\n\n<p>The Consultant will be required to provide milestone presentations of their design and Drawings to Federal TVET Institute, Addis Ababa and representatives of the Addis Ababa city administration construction Bureau. before finalizing the design and tender documents. A technical audit shall be conducted by the Addis Ababa city administration construction Bureau. aims in providing value engineering and the incorporation of appropriate health &amp; safety measures. This will follow the presentation, and the Consultant should be available to comment on matters raised in the technical audit within the week following the presentation.</p>\n\n<p><strong><em>Confidential Cost Estimates</em></strong></p>\n\n<p>The Consultant shall prepare preliminary and detailed confidential cost estimates, as required, using the latest available cost information for similar projects in Ethiopia. It will adjust to reflect conditions in the project area and a realistic program for implementation. Necessary whole life cost comparisons based on design options should be made for discussion purposes, with due regard to long-term performance and function of the buildings and site. Cost estimates should also include future maintenance and renewals.</p>\n\n<p>The Consultant&rsquo;s estimate of the works period should, in calendar days. The performance period will include all possible statutory shutdowns, public holidays, etc. The Consultant will take into account the impacts of wet and dry seasons to likely start and completion dates.</p>\n\n<p>The estimates should allow for preliminary and general items, all works and day works.&nbsp; The estimate should be in Birr with details of the assumptions made, including those relating to taxes and customs duties. An estimate of any compensation for payment of ERA to third parties is also required.</p>\n\n<p>The cost estimates, the schedule of quantities and the tender documents will be prepared in a manner to allow maximum flexibility in the award of contract.</p>\n\n<p><strong><em>Tender Documents</em></strong></p>\n\n<p>The Consultant will prepare tender documents for an open international competition incorporating the full requirements, format, regulations, and conditions of the World Bank. The Consultant will be required to provide a presentation of his tender (including</p>\n\n<p>design philosophy) to Federal TVET Institute, Addis Ababa city administration construction Bureau. The agreed design philosophy shall be stated in the design report.</p>\n\n<p>The Consultant shall prepare final complete sets of tender documents, which will serve as a basis for tendering the project based on International Competitive Bidding (ICB) procurement method as agreed by the client, using World Bank procurement procedures and standard procurement documents.&nbsp; Bank&rsquo;s standard procurement document for small works shall be used incorporating the following sections: -</p>\n\n<p><strong><u>Volume I&nbsp;&nbsp; </u></strong></p>\n\n<p>Section I&nbsp; &nbsp;&nbsp; Invitation for Bids</p>\n\n<p>Section II&nbsp; Instructions to Bidders</p>\n\n<p>Section III&nbsp; Bidding Data</p>\n\n<p>Section IV&nbsp; Conditions of Contract Part I: General Conditions of Contract</p>\n\n<p>Section V&nbsp;&nbsp; Conditions of Contract Part II: Conditions of Particular Applications</p>\n\n<p><em>Section IX&nbsp;&nbsp;&nbsp;&nbsp; Forms of Agreement, Performance Guarantee (Unconditional and Conditional)&nbsp;&nbsp; and Bank/Insurance Guarantee for Advance Payment (Unconditional and Conditional), Anti-Bribery Pledge Form, Form of Advance Payment Disbursement Agreement, and Advance Payment Disbursement Schedule</em></p>\n\n<p>Section XI &nbsp;&nbsp;&nbsp;not used</p>\n\n<p>Section XIII Dispute Settlement Procedure</p>\n\n<p>Section XIV Eligible countries</p>\n\n<p><strong><u>Volume II&nbsp;&nbsp; </u></strong></p>\n\n<p>Section XII Qualification Questionnaire&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p><strong><u>Volume III</u></strong></p>\n\n<p>&nbsp;Section VII Form of Bid, Appendix to Bid and Form of Bid Security</p>\n\n<p>&nbsp;Section VIII Bill of Quantities</p>\n\n<p><strong><u>Volume IV</u></strong></p>\n\n<p>Section VI Technical Specifications</p>\n\n<p><strong><u>Volume V&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </u></strong></p>\n\n<p>Section X&nbsp;&nbsp; Drawings</p>\n\n<p>The Consultant will prepare twelve (12) sets of tender documents.</p>\n\n<p><strong>Design Requirements</strong></p>\n\n<p>Accommodations</p>\n\n<p>Refer to Annex 1 for requirements and regulations of the municipal &ldquo;planning consent&rdquo; forms.</p>\n\n<p>Building to comprise a ground floor plus 8 floors and above</p>\n\n<p>Functional Requirements</p>\n\n<p>Vehicular access and circulation in accordance with the road and driving situation of the area and convenient vehicular movement at parking.</p>\n\n<p>Convenient and designated access to prospective staff and visitors at the ground and upper floors.</p>\n\n<p>Electricity, water, telephone mains, and garbage disposal requirements at basement levels (this includes a design for transformer, generator, electric main distribution boards, It architecture, water reservoir pumps, main telephone equipment, and groundwater pumping facility space)</p>\n\n<p>Provide duct/shaft for sewage, water, electric and IT cables, telephone lines and rainwater disposal at appropriate locations and maintain vertical alignment for good construction and maintenance.</p>\n\n<p>Provide fire escape staircase for a tower block, but it should not be the circular-shaped metal type.</p>\n\n<p>Wheelchair accessibility for disabled from the street to the lifts and at toilets.</p>\n\n<p>Landscaping and development of all associated recreational facilities, storage, and accommodation blocks.</p>\n\n<p>Environmental Concerns</p>\n\n<p>Design with natural ventilation possibilities.</p>\n\n<p>Provision of daylight for all rooms is desirable</p>\n\n<p>Concern for view and strong sun/UV protection.</p>\n\n<p>Aesthetics</p>\n\n<p>Simple but elegant volumetric composition</p>\n\n<p>Attractive facade configurations without excessive displacement of the building enclosures. Application of curtain wall to be in consideration of its environmental, heat transmission and maintenance problems.</p>\n\n<p>Interesting and vibrant interior spaces especially at lower floors and entrance lobby.</p>\n\n<p>Auditorium, restaurant, recreational areas and public spaces inside the building to receive creative interior space with light, exterior manifestation to give the building a unique identity.</p>\n\n<p>The whole building to manifest a unique architectural external identity, including traditional and national features, not of overworked volumes but one of creative modern image, reflecting some of the architectural characters of the buildings of the neighbourhood.</p>\n\n<p>The project&rsquo;s future place among future adjacent buildings must be taken into consideration.</p>\n\n<p>Structure, Construction, and Economy&nbsp;</p>\n\n<p>Well-conceived structural system.</p>\n\n<p>Appropriate and ample spacing of columns.</p>\n\n<p>Appropriate durable, easily available, maintenance free construction materials.</p>\n\n<p>The design should try to maintain the economy as a major factor so that the project shall be cost-effective.</p>\n\n<p><strong>Draft Schedule of Accommodations, based on Design Concept</strong></p>\n\n<p>The following schedule is preliminary and subject to change. It is indicative and does not reflect any design considerations. The design consultant will make any necessary changes to comply with the Institute&rsquo;s requirements and comply with relevant design Standards and Regulations.</p>\n\n<ol>\n\t<li><strong><u>Center of Excellence for precision Tool and die Making Technology</u></strong></li>\n</ol>\n\n<table cellspacing=\"0\" style=\"width:778px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"height:26.25pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:148.5pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:49.5pt\">\n\t\t\t<p><strong>No. User</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:26.25pt; width:.75in\">\n\t\t\t<p><strong>No. of Rooms</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:26.25pt; width:67.5pt\">\n\t\t\t<p><strong>Indicative Room size m2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:81.0pt\">\n\t\t\t<p><strong>Total size</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:76.5pt\">\n\t\t\t<p><strong>Remarks</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>A</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Library</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Periodicals</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Information desk</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Back office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Media loaning counter</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Computer lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>96</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Book stack /media stack</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>160</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Reading areas</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>200</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Individual study suits</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>72</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Media store and reparation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Delivery with office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Researchers offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>72</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 824</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>B</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Caf&eacute; and Restaurant</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Cafe</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>400</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>400</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Restaurant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Kitchen</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Stores</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Cold rooms</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>27</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Dish wash</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Changing room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Staff</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>36</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Waste management</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:22.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"height:22.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 930</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Student Accommodations</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:45.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Dormitories</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:45.0pt\">\n\t\t\t<p>270</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>4320</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets with showers</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:45.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>1250</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Porters</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:45.0pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Laundry</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:45.0pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>36</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>144</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Study and training spaces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:45.0pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>6254</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>D</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Physical Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:18.75pt; width:54.3pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:67.2pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>kombi-sports court</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:54.3pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.2pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>as needed</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Indoor gym and games</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:54.3pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.2pt\">\n\t\t\t<p>612</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>612</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>Multi-purpose Gym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Tennis court, badminton, etc.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.0pt; width:54.3pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.2pt\">\n\t\t\t<p>1008</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>2016</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>Outdoor as needed</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:19.75pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"height:19.75pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:81.0pt\">\n\t\t\t<p><strong>2628</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>E</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Workshops and maintenance</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:31.9pt; vertical-align:bottom; width:29.9pt\">&nbsp;</td>\n\t\t\t<td style=\"height:31.9pt; width:148.5pt\">\n\t\t\t<p>Machine shop/Lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:31.9pt; width:.75in\">\n\t\t\t<p>1 (40x18)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:31.9pt; width:67.5pt\">\n\t\t\t<p>720</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:81.0pt\">\n\t\t\t<p>720</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:31.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Material Testing Lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2(15x10)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>300</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Material store</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3(12x10)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>120</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>360</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>CNC Lab/ workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (30x16)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Foundry lab/ workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (15x16)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>240</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>240</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>CAD/CAM Lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (8x12)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>96</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>96</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Metrology Lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (12x10)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>120</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>120</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Welding workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (30x16)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Hydraulics and pneumatics lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (15x3)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>195</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>195</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Heat treatment lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (15x16)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>240</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>240</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Forming lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (20x16)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>360</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>360</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Shower and dressing room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2(6*5)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>30</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Compressor room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1(4*4)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Generator Room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1(4*4)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Incubation center and learning factory</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; vertical-align:top; width:.75in\">\n\t\t\t<p>1(10x10)</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; vertical-align:top; width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:81.0pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>3683</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p><strong>F</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Guest Building</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.15pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:148.5pt\">\n\t\t\t<p>Lobby</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:16.15pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:16.15pt; width:67.5pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:81.0pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Guest Bedrooms</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>1000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Restaurant &amp; Caf&eacute;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Kitchen &amp; Service room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Guest Gym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Laundry</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Staff changing room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Instrument&nbsp; maintenance</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">&nbsp;</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>1,490 </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:20.65pt; width:29.9pt\">\n\t\t\t<p><strong>G</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.65pt; width:148.5pt\">\n\t\t\t<p>Class Room and Lecture Room</p>\n\n\t\t\t<p>With academic staff offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.65pt; width:49.5pt\">&nbsp;</td>\n\t\t\t<td colspan=\"2\" style=\"height:20.65pt; width:.75in\">\n\t\t\t<p><strong>40</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:20.65pt; width:67.5pt\">\n\t\t\t<p><strong>50</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.65pt; width:81.0pt\">\n\t\t\t<p><strong>2000</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.65pt; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:20.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Conference hall/ Seminar hall</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>5</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>70</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>350</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>H</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Administration Building (Ground plus 8)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>23</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>-</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>720</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:29.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li><strong><u>Center of Excellency for leather and leather products</u></strong></li>\n</ol>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:678px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"height:26.25pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:148.5pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:49.5pt\">\n\t\t\t<p><strong>No. User</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:.75in\">\n\t\t\t<p><strong>No. of Rooms</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:67.5pt\">\n\t\t\t<p><strong>Indicative Room size m2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:81.0pt\">\n\t\t\t<p><strong>Total size</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:26.25pt; width:76.5pt\">\n\t\t\t<p><strong>Remarks</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>A</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Library</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Periodicals</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Information desk</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Back office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Media loaning counter</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Computer lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>96</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Book stack /media stack</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>160</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Reading areas</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>200</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Individual study suits</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>72</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Media store and reparation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Delivery with office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Researchers offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>72</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 824 </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>B</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Caf&eacute; and Restaurant</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Cafe</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>400</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>400</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Restaurant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Kitchen</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Stores</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Cold rooms</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>27</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Dish wash</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Changing room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>48</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Staff</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>36</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Waste management</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:22.9pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.9pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.9pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:22.9pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.9pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 930 </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.9pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:22.0pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; vertical-align:top; width:148.5pt\">\n\t\t\t<p><strong>Students Lounge&nbsp; </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:22.0pt; width:121.5pt\">\n\t\t\t<p><strong>Typical to the main campus </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:81.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>D</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Student Accommodations</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Dormitories</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>135</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>2160</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilets with showers</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>625</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Porters</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>30</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Laundry</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>36</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>72</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Study and training spaces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>240</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>3127</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>E</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Physical Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.75pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>kombi-sports court</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>as needed</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Indoor gym and games</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>612</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>612</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>Multi-purpose Gym</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Tennis court, badminton, etc.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>1008</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>2016</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>Outdoor as needed</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:19.75pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:19.75pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:81.0pt\">\n\t\t\t<p><strong>2628</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.75pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:31.9pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>F</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Workshops and Maintenance</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:31.9pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Footwear Lab/ workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (30x16)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Leather Goods Workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (30x16)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Leather Garments Workshop</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (30x16)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>480</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Leather process Lab with ETP</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (40x18)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>720</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>720</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Leather Testing Lab</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2(15x10)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>300</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Material store</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>3(12x10)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>120</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>360</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Advanced CAD Lab for Leather Products</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1 (15x10)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Incubation canter and learning factory</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1(10x10)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>100</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:121.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>2970</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.15pt; vertical-align:bottom; width:31.5pt\">\n\t\t\t<p><strong>G</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; vertical-align:bottom; width:148.5pt\">\n\t\t\t<p><strong>Guest Building</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:49.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:.75in\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:67.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:81.0pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.15pt; width:76.5pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Lobby</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Guest Bedrooms</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>1000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Restaurant &amp; Caf&eacute;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>150</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Kitchen &amp; Service room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>80</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Guest Gym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>60</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Laundry</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Staff changing room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Instrument&nbsp; maintenance</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p>50</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:22.0pt; vertical-align:bottom; width:31.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:22.0pt; width:148.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:22.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:.75in\">&nbsp;</td>\n\t\t\t<td style=\"height:22.0pt; width:67.5pt\">\n\t\t\t<p><strong>Subtotal</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:81.0pt\">\n\t\t\t<p><strong>1,490 </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.0pt; width:76.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p><strong>H</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p><strong>Class Room and Lecture Room </strong></p>\n\n\t\t\t<p><strong>With academic staff offices</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>1452</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>7260</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Class room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>5</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>50</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>250</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Lecture Room</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>112.5</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>225</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Academic staff offices</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>5</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>15.81</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>79.05</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilet and Shower&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>4</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p><strong>26.25</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>52.5</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:44.5pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>I</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:148.5pt\">\n\t\t\t<p><strong>Administration Building (Ground plus 8)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:.75in\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:67.5pt\">\n\t\t\t<p><strong>-</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:81.0pt\">\n\t\t\t<p><strong>720</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:44.5pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"3\" style=\"height:15.0pt; width:31.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Office</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>12</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>425</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Toilet</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>24</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:148.5pt\">\n\t\t\t<p>Meeting hall</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:.75in\">\n\t\t\t<p><strong>1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:81.0pt\">\n\t\t\t<p><strong>126</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Scope of Design Services</strong></p>\n\n<p>&nbsp;The scope is:</p>\n\n<p>Execution of a topographic survey and site investigation;</p>\n\n<p>Develop the given concept design into final detailed design and associated documentation;</p>\n\n<p>Tender document and engineer&rsquo;s estimate preparation;</p>\n\n<p>Supervision of works and contract administration.</p>\n\n<p><strong>Topographic Survey and Site Investigation </strong></p>\n\n<p>The selected Firm will scope and direct all necessary topographic and geotechnical investigations and will produce relevant factual and interpretive reports and results. Foundation designs, earthworks and groundwater requirements will be produced.</p>\n\n<p><strong>Detailed Design</strong></p>\n\n<p>The final working drawings will include:</p>\n\n<p><strong>Architectural</strong></p>\n\n<p>Site plan to scale of 1:200</p>\n\n<p>Floor plans to a scale of 1:50 to 1:100 or 1:200</p>\n\n<p>Special drawings and schedules for doors, windows, stairs, fixed interior decoration to a scale of 1:20 or 1:10 or 1:5</p>\n\n<p><strong>Structural </strong></p>\n\n<p>Plans of formwork to a scale of 1:50</p>\n\n<p>Plans for slab reinforcement to a scale of 1:50</p>\n\n<p>Foundation plans to a scale of 1:50</p>\n\n<p>Structural sections to a scale of 1:20 or 1:10</p>\n\n<p>Beam, column, and foundation reinforcement drawings to a scale of 1:20 or 1:10</p>\n\n<p>Drawings for wooden or steel structure to a scale of 1:20 or 1:10</p>\n\n<p>Details to the scale of 1:10, 1:5, 1:1 or as required</p>\n\n<p>Bar bending schedules</p>\n\n<p>Structural calculations</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Sanitary and Mechanical </strong></p>\n\n<p>Site plan to a scale of 1:100 or 1:200</p>\n\n<p>Floor plans for water supply, wastewater discharge, firefighting systems to a scale of 1:50</p>\n\n<p>Detail drawings for special items to a scale of 1:20 or 1:10 or 1:5 or 1:1</p>\n\n<p>Hydraulic and other necessary calculations</p>\n\n<p><strong>Electrical</strong></p>\n\n<p>Site plan to scale of 1:200</p>\n\n<p>Floor plans for electric lighting, call systems, data, telephone, socket, TV and other installations to a scale of 1:50</p>\n\n<p>Detail drawings for special items to scale of 1:20 or 1:10 or 1:5 or 1:1</p>\n\n<p>Distribution layout and wiring diagrams for all distribution boards</p>\n\n<p><strong>Design reports</strong></p>\n\n<p>Each of the above shall be supported by design reports along with design calculation for a clear understanding of various documents.</p>\n\n<p><strong>Technical specification and bill of quantities</strong></p>\n\n<p>The project technical specification shall be prepared using standard specifications and project specific specifications as an addendum to ensure all the detailed information isincorporated in the project documents. The specifications should:</p>\n\n<p>Ensure that suitable specifications are available or that reference is made to an applicable standard; and that the referenced standard would easily be achieved by, or available to, the contractor along with supplies for items not included in the standard specifications.</p>\n\n<p>Include sufficient catalogue cuts and references in the addenda to the specifications to define precisely the quality of materials to use.</p>\n\n<p>Be structured to allow for flexibility in using alternative equivalent materials within the limits of the budget.</p>\n\n<p>Make provision for inclusion of the requirement of deliverables to the client such as as-built drawings, maintenance and operating manuals of plant and equipment, and testing requirements.</p>\n\n<p>The bill of quantities should incorporate:</p>\n\n<p>Accurate quantities and descriptions;</p>\n\n<p>Provision of references to specifications and drawings wherever required;</p>\n\n<p>Inclusion of the possibility of the client procuring materials if requested;</p>\n\n<p>Segregation of work items that are not necessarily included in a work.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase II: -Construction Supervision</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Consultant shall fulfil all the duties and responsibilities of the Engineer and the Engineer&rsquo;s Representative, as detailed under the contract for construction of the Works.</p>\n\n<p>The Services consist of furnishing complete engineering services in all respects, including all field and office work strictlyin accordance with the highest standards of the civil engineering profession and with the proper interpretation of the duties and responsibilities of the Engineer.</p>\n\n<p>The scope of services shall include all the services necessary to achieve the objectives described in &ldquo;2&rdquo; above and in so doing, the consultant shall execute not less than the following tasks:</p>\n\n<ol>\n\t<li>Supervise the construction of the works to ensure execution with high skill and workmanship in accordance with the drawings and specification.</li>\n\t<li>Supervise test of construction materials.</li>\n\t<li>Check and approve samples of materials and supplies submitted by the contractor for conformity with the material and supplies indicated in the specifications.</li>\n\t<li>Advice the client on the need for a special inspection or testing other than those referred to in the contract document.</li>\n\t<li>Check and verify, on a regular, basis the validity of all insurances/guaranties, which the contractor is obliged to have in place.</li>\n\t<li>Check that the contractor follows safe working practices in all operations and immediately draw attention to any instances where this policy is not followed, advising the contractor to carry out all such works deemed necessary in case of an emergency affecting the safety of personnel, works, and adjacent property.</li>\n\t<li>Check, and if necessary prepare bar bending schedules and further designs and drawings for any additional work, which may be necessary for the proper completion of the project.</li>\n\t<li>Perform all required design changes/modification/ amendments / additional design necessary or advisable as an outcome of the above services and/or to suit field conditions during construction.&nbsp; The outcome should be prepared as a review report and submitted to the Client with a recommendation.</li>\n\t<li>Preparation of work plan and schedule of activities?</li>\n\t<li>Issue the Contractor with all necessary copies of Technical Specifications and Contract Documents or timely provide any such supplementary information requested by the Contractor, necessary for the Contractor to carry out the Works</li>\n\t<li>Prepare Instruction and Variation Orders (VO) as recommended or necessary, complete with the associated measurement and payment instructions.&nbsp; Issue such instructions and VO&rsquo;s and for the associated implications.&nbsp; (The Particular conditions of contract may require the Client&rsquo;s approval prior to the issue of some instructions or variations).</li>\n\t<li>Ensure that the required design changes/modifications/amendments/additional design should take into consideration issues such as economy, locally available construction material, applicable construction method, the objective of the project, etc.</li>\n\t<li>Routinely and at not more than quarterly intervals, advise the Client of the estimated total cost to completion of the work with a detailed reasoning for the increase or decrease of the project cost, if any.</li>\n\t<li>Approve the Contractor&rsquo;s setting out of the Works and preparation of the Works, prior to issuing approval to begin a new activity or proceed with the following activities.</li>\n\t<li>Routinely inspect the Works under Construction, for compliance with the Specifications and the agreed method of working, as a basis for payment</li>\n\t<li>Keep and maintain up-to-date detailed daily site diary and records, making them available for inspection by the Client or his representative.Make available all records regarding contractual correspondence and data on all work stoppages or delays, accidents on Site, official visitors to Site, all weather records, all activities in progress at any time on Site showing the start and end time and full details of the resources employed per activity.</li>\n\t<li>Keep and maintain detailed records (and make available for inspection) of the Contractor&rsquo;s equipment on Site and its precise date of arrival on or removal from Site, its date of manufacture, previous hours worked and condition, the date commissioned to commence work, its availability, and utilization. Establish equipment availability figures for each category of equipment.</li>\n\t<li>Review the Contractor&rsquo;s proposed work programs, associated work method statements, resource analysis, requirements, and approve or reject the proposals accordingly. Identify any changes or additional resources required.</li>\n\t<li>Continuously monitor the Contractor&rsquo;s progress against the program and his method of working in respect of each and all construction activities and produce a resource analysis against production needs. Advise the Contractor when additional resources or revised methods of working or reprogramming of the works are necessary.</li>\n\t<li>Review the proposed workshop drawings/plans and associated calculations. Approve or reject the proposals accordingly, and identify any changes required.</li>\n\t<li>Institute a detailed quality control system to ensure adequate supervision and positive control of all works at all times. The qualified personnel shall apply all levels of control to ensure adherence to the finished levels and the standards of acceptance.</li>\n\t<li>Review and check the Contractor&rsquo;s payment applications and, after verifying the accuracy of the measurement and costing calculations and the sufficiency of the supporting documentation, prepare and issue Interim Payment Certificates for processing by the Client and advise the Client for liquidated damages.</li>\n\t<li>Monitor the payment process and alert the Client when payment delays accrue to the point when; (a) interest charges will become due and (b) the Client will be in Default for late payment.</li>\n\t<li>Thoroughly review and analyze all the Contractor&rsquo;s applications for extensions of time or claims for additional payment and furnish the Client with the Consultant detailed analysis of such applications and recommended rulings and, subject to the Client&rsquo;s approval (where necessary), advise the Contractor accordingly.</li>\n\t<li>Submit progress reports, final reports, and records and other hard outputs regarding construction progress and the status of the works contract and the consulting services contract in accordance with the reporting schedule.</li>\n\t<li>Collect, review and submit two full sets of as-built drawings, prepared by the contractor, within two months of completion of the works.</li>\n\t<li>Conduct inspection and reporting of provisional acceptance of the project.</li>\n\t<li>Conduct inspection and reporting of final acceptance of the project.</li>\n</ol>\n\n<ol>\n\t<li><strong>Deliverables</strong>\n\n\t<ol>\n\t\t<li><strong>Type &amp; Content</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Consultant shall prepare and submit the following types of documents for the assignment. The Consultant will submit a proposed Contents Page for each report to the Client for approval before finalizing the first draft of each report.</p>\n\n<p>The Consultant shall prepare and submit directly by hand or by courier to the Client the following reports and documents in the numbers stated as per the format that will be provided by the Client and/or as per the format developed by the Consultant and approved by the Client.</p>\n\n<p><strong>Phase I: - Detailed Engineering Design and Preparation of Tender Document</strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:435.8pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:29.3pt; vertical-align:top; width:52.75pt\">\n\t\t\t<p><strong><em>I.No</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.3pt; vertical-align:top; width:210.65pt\">\n\t\t\t<p><strong><em>Types of Reports/Documents</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.3pt; vertical-align:top; width:92.7pt\">\n\t\t\t<p><strong><em>Draft No.</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:29.3pt; vertical-align:top; width:79.7pt\">\n\t\t\t<p><strong><em>Final No.</em></strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Progress Report &ndash; every month until completion of the contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p><em>-</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p><em>5</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Soil and Materials Report&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p><em>3</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p><em>5</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Preliminary Design Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p><em>3</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p><em>5</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Topographical Survey Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p><em>3</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p><em>5</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Complete set of Drawings&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p>3A3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p>15A3 &amp; 5A1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Cost Estimate&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Tender Documents&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:52.75pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:210.65pt\">\n\t\t\t<p>Consultancy completion Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:92.7pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:79.7pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Phase II: - (Construction Supervision)</strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:436.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p><strong><em>Types of Reports/Documents</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p><strong><em>Draft No.</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p><strong><em>Final No.</em></strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Contractor&rsquo;s Mobilization Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Monthly Progress Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Quarterly Progress Reports</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Annual Progress Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Contract completion Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultancy Completion Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant&rsquo;s Quality Assurance Manual</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:1.25in\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:81.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Submission of electronics reports, papers, and presentations shall be in CD ROM; compatible with latest versions of Microsoft Office and Windows XP and as a pdf file).</p>\n\n<p>Based on the approved detailed design drawings and documents, the Consultant shall prepare the draft tender documents and construction cost estimate for the procurement of contracting services to construct the building complexes and facilities.</p>\n\n<p>The consultant shall prepare tender documents and conduct the bidding process, evaluate the offers, select the winning building contractor and prepare a contract agreement between the Federal TVET Institute, Addis Ababa and the prospective contractor.</p>\n\n<p>The Final Report includes detailed design and associated documents, and shall be submitted to Federal TVET Institute, Addis Ababa within 4 months of the start of the project.</p>\n\n<p>The consultant shall submit three (3) hard copies and one (1) soft copy of the final working drawings and documents (tender documents and engineer&rsquo;s estimates, technical specifications, bill of quantities and final design reports) to Federal TVET Institute, Addis Ababa along with soft copy of the drawings in Auto CAD format and the associated documents in MS Word.</p>\n\n<ol>\n\t<li><strong>Team Composition</strong></li>\n</ol>\n\n<p>The Consultant shall provide competent personnel for the services andmanage by the Team Leader who will represent the Consultant in performing the services. All the Consultant&rsquo;s personnel shall be fluent in the full use (i.e. the writing, reading and speaking) of the contract language, which is in English.&nbsp; In addition, all the key staff described herein shall be fully computer literate in word processing and spreadsheets.</p>\n\n<p>The Consultant shall provide competent personnel for the performance of the services. All experts who have a crucial role in implementing the project refer to as key experts.&nbsp; It emphasizes that the required professional competences and experience outlined below are not necessarily specific team positions.&nbsp; It expects that individual expert will be involved in both Phase 1 and Phase 2.</p>\n\n<p>The project team will include national experts who have extensive knowledge of Ethiopia&rsquo;s conditions and characteristics of the Ethiopian public and private sectors.&nbsp; The Consultants may, with the Authorities consent, contract out some specific tasks to sub-contractors when this is considered to be more feasible than extending the study team capacity.&nbsp; The consultants shall carry overall responsibility for all study activities under their management. Some of the required specializations and expected time duration herein indicated below:</p>\n\n<p><strong>Table: Number of Professionals in Phase 1 and Phase 2</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"width:256.6pt\">\n\t\t\t<p><strong>Key Staff</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"width:193.5pt\">\n\t\t\t<p><strong>Estimated Staff Man Month Input</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:117.0pt\">\n\t\t\t<p><strong>Phase 1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:76.5pt\">\n\t\t\t<p><strong>Phase 2</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Team Leader/Senior Professional Architect</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Resident Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>0</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Professional Architect</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Professional Structural Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Professional Sanitary Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Mechanical Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Electrical Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Geotechnical Engineer</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Professional IT expert</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Contracts Specialist</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Quantity Surveyor</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:256.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>EIA Specialist</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:117.0pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:76.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#b8cce4; width:256.6pt\">\n\t\t\t<p><strong>Total Man-Month</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#b8cce4; width:117.0pt\">\n\t\t\t<p><strong>26</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#b8cce4; width:76.5pt\">\n\t\t\t<p><strong>70</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>The profiles of the key experts for this contract are as follows:</strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Team Leader/Senior Architect </strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc/M.Sc degree level&nbsp; in Architecture, with 10 years of experience with building design and supervision management, preferably prestigious developments</p>\n\n<p>Track record in similar establishments (e.g. training, research, or educational)</p>\n\n<p>8 year experience on building construction in Ethiopia</p>\n\n<p>Demonstrable experience in building regulations of Ethiopia</p>\n\n<p>Member of the professional body in Ethiopia and appropriately registered architect</p>\n\n<p>Experience of bespoke building projects would be a significant advantage and significant and relevant experience of working with government departments</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Resident Engineer</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A minimum of B.Sc/M.Sc degree in Civil Engineering or Construction Management with 10 years of experience with building design and supervision management, respectively, preferably in prestigious developments</p>\n\n<p>Track record in similar establishments (eg training, research, or educational)</p>\n\n<p>8 year experience on building construction in Ethiopia</p>\n\n<p>Demonstrable experience in building regulations of Ethiopia</p>\n\n<p>Member of a professional body in Ethiopia and appropriately registered Engineer</p>\n\n<p>Experience of bespoke building projects would be a significant advantage</p>\n\n<p>Good understanding of Contracts, variations, measurement, dispute management, and cost control</p>\n\n<p>Experience in Value Management</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Professional Architect </strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc./M.Sc. degree level in Architecture, with 6 years of experience with building design and supervision management, respectively, preferably in prestigious developments</p>\n\n<p>Track record in similar establishments (e.g. training, research, or educational)</p>\n\n<p>4 year experience on building construction in Ethiopia</p>\n\n<p>Demonstrable experience in building regulations of Ethiopia</p>\n\n<p>Member of a professional body in Ethiopia and appropriately registered architect</p>\n\n<p>Experience of bespoke building projects would be a significant advantage and significant and relevant experience of working with government departments</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Structural Engineer</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>BSc/MSc Degree in Civil/ Structural Engineering</p>\n\n<p>Minimum of 8years&rsquo; experience with building design and supervision, respectively</p>\n\n<p>Minimum of 8 years of building design and supervision experience in Ethiopia with a track record of design achievements related to the construction of institutional buildings and demonstrable experience in building regulations of Ethiopia out of which one (1) year of experience in the design of structural elements under vibration load effect conditions.</p>\n\n<p>Experience of bespoke building projects would be a significant advantage</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Quantity Surveyor</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc Degree/Advance Diploma in Civil/Building Engineering with 10 years of professional experience in the Field</p>\n\n<p>Minimum 6/8 years of professional experience in Quantity Surveying for Buildings in Ethiopia</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Sanitary Engineer</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc/M.Sc Degree in Sanitary/hydraulics engineering with 6 years of professional experience in Civil engineering, respectively.</p>\n\n<p>5 years&rsquo; experience in sanitary design and construction of Buildings with demonstrable experience in building regulations of Ethiopia</p>\n\n<p>Track record in similar establishments (e.g. training, research, or educational)</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Mechanical Engineer</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc/M.Sc Degree in Mechanical Engineering with 8 years of professional experience in electro-mechanical devices installation, respectively.</p>\n\n<p>5 years&rsquo; experience electro-mechanical devices installation works for laboratory and/or similar facilitated Buildings in Ethiopia</p>\n\n<p>Track record in similar establishments (e.g. training, research, or educational)</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Electrical Engineer</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A Minimum of B.Sc/M.Sc Degree in Electrical Engineering with 8 years of professional experience in electrical installation design and supervision, respectively.</p>\n\n<p>5 years of experience in installation work for laboratory and/or similar facilitated Buildings in Ethiopia</p>\n\n<p>Track record in similar establishments (e.g. training, research, or educational)</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Geotechnical Engineer </strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>BSc/MSc Degree in Civil/ Geotechnical Engineering</p>\n\n<p>Minimum of 10 year experience in Design of&nbsp; building a foundation and retaining walls</p>\n\n<p>Minimum of 8 years of Design of building foundation and supervision experience in Ethiopia with a track record of design achievements related to the construction of institutional buildings and demonstrable experience in building regulations of Ethiopia. Moreover, experience in Geotechnical investigation, testing, and interpretation of results for the design of structural foundation of building out of which one (1) year of experience in the design of foundation in expansive soil under vibration load effect conditions.</p>\n\n<p>Experience of bespoke building projects would be a significant advantage</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>&nbsp;&nbsp;IT Expert</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>M.Sc/B.Sc. Degree or equivalent in Information Technology/Computer Science/Computer Engineering/MIS or related fields with 8 years of relevant experience.</p>\n\n<p>Certified as a Microsoft Certified Systems Administrator (MCSA) and/or Microsoft Certified Systems Engineer (MCSE)</p>\n\n<p>Minimum of&nbsp; 2 years specific professional experience on Microsoft operating systems and office suite&nbsp;</p>\n\n<p>Demonstrable practical experience of computer hardware and maintenance</p>\n\n<p>Experience in the establishment or management of IT support systems for organizations.</p>\n\n<p>Extended work relation with the firm/Associate firm.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Contract&nbsp; Specialist</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>B.Sc/M.Sc Degree in Civil Engineering/Construction Technology and Management or related&nbsp; field with 8 year experience in public procurement systems</p>\n\n<p>4years experience in development of tenders across a range of procedures and conditions of contract</p>\n\n<p>3 year of experience in direct involvement in handling claims on building construction in Ethiopia</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>EIA specialist should be involved</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>B.Sc/M.Sc Degree in environmental engineering and related&nbsp; field with 5 year experience in construction environmental control</p>\n\n<p>All experts must be independent and free from conflicts of interest in the responsibilities accorded to them.</p>\n\n<p>CVs for experts other than the key experts are not examined prior to the signature of the contract.&nbsp; The Consultant shall select and hire other experts as required according to the profiles identified in his Organization &amp; Methodology and/or this Terms of Reference.&nbsp; These profiles must indicate whether they are to be regarded as long-term/short-term, international/local and senior/junior so that it is clear which fee rate in the budget breakdown will apply to each profile.&nbsp; For the purposes of this contract, international experts are those whose permanent residence is outside the beneficiary country while local experts are those whose permanent residence is in the beneficiary country.</p>\n\n<p>The selection procedures used by the Consultant to select any other experts shall be transparent and based on pre-defined criteria, including professional qualifications, language skills, and work experience.&nbsp; The final selection of experts shall be subject to approval by Federal TVET Institute, Addis Ababa. Note that civil servants and other staff of the public administration are not eligible for recruitment as experts under this project. Backstopping costs and the costs of all support staff must be included in the fee rates of the key experts.</p>\n\n<ol>\n\t<li><strong>Selection criteria</strong>\n\n\t<ol>\n\t\t<li><strong>Qualifications and competence of the key professional staff engaged in the consultancy service:</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p><strong>Design Stage</strong></p>\n\n<p>Practicing Professional Architect</p>\n\n<p>Practicing Professional Structural Engineer</p>\n\n<p>Practicing Professional Sanitary Engineer</p>\n\n<p>Practicing Professional Mechanical Engineer</p>\n\n<p>Practicing Professional Electrical Engineer</p>\n\n<p>Professional Geotechnical Engineer</p>\n\n<p>Professional Engineer</p>\n\n<p>Technicians</p>\n\n<p><strong>Construction Stage</strong></p>\n\n<p><strong>Project Team Leaders</strong></p>\n\n<p>Office Engineers</p>\n\n<p>Resident Engineer (project site)</p>\n\n<p>Site Supervisor (project site)</p>\n\n<p>The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria:</p>\n\n<p>(a)General qualifications and experience</p>\n\n<p>(b) Adequacy for the assignment</p>\n\n<p>(c) Experience in region and language</p>\n\n<p><strong>Adequacy of the proposed methodology and work plan</strong></p>\n\n<p>(a) Technical approach and methodology</p>\n\n<p>(b) Work plan</p>\n\n<p>(c) Organization and staffing</p>\n\n<p>The Consultant has successfully completed at least five similar or related Projects with a budget of&nbsp;&nbsp; each 300 million ETB, or these projects has to be completed more than 90% of the contract value.</p>\n\n<ol>\n\t<li><strong>Assignment Period</strong>\n\n\t<ol>\n\t\t<li><strong>Phase-I</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The duration of the services from the date of commencement of the contract to the completion period of the services is <strong>four (4) months.</strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Phase- II</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Duration of the services is extended from the date of commencement of the contract to the end of the defect liability (maintenance) period of the works, which is envisaged to be a period of approximately <strong>24 months</strong> of construction including one (1) month of mobilization and twelve (12) months of defect liability period. A one (1) man-month input for the Resident Engineer with the required provisions during the one year of defect liability period is envisaged.</p>\n\n<p>During the Contractor&rsquo;s mobilization period, the Consultant shall operate with a skeleton staff agreed with the client. There are only two staffs and only the Resident Engineer will be there during the defects liability period. Staff mobilization and demobilization plans are to form part of the Consultant&rsquo;s technical proposal and related financial proposal.</p>\n\n<p>The continuation of the downstream phase i.e. the construction supervision will be dependent upon the satisfaction of the client on the performance of the consultant during Phase I and the availability of fund for the construction of the project.</p>\n\n<p>The maximum duration between the end of Phase I and the beginning of Phase II shall be 1 year.</p>\n\n<ol>\n\t<li><strong>Facilities, Services, and Resources to be provided by Procuring Entity</strong></li>\n</ol>\n\n<ol>\n\t<li>The Procuring Entity will avail to the Consultant free of charge all available documents relevant to the project.</li>\n\t<li>The Procuring Entity will provide liaison with other Ministries/Departments of the Government in order to introduce the Consultant.&nbsp; The Consultant shall be fully responsible for the collection of data and information from these agencies.</li>\n\t<li>The Procuring Entity may assign staff (maximum of 2 at any one time) to the Consultant for on the job training in the various aspects of the Consultant&rsquo;s duties.</li>\n</ol>\n\n<ol>\n\t<li><strong>Additional Responsibilities of the Consultant</strong></li>\n</ol>\n\n<p><strong>Phase I: Detailed Engineering Design and Tender Document Preparation</strong></p>\n\n<p>The consultant shall provide himself with office facilities, accommodation, transport, equipment, consumables, staff, support staff and any other resources necessary for the complete excision of the service. The cost of all the provisions mentioned above shall be detailed on the Consultant&rsquo;s financial proposal.</p>\n\n<p>The Consultant shall attend monthly joint/progress meeting with the college and shall take minutes of those meeting and submit the minutes to Federal TVETI.</p>\n\n<p>The Consultant shall make the necessary presentations of the findings as well as the reports submitted as required by the Client.</p>\n\n<p><strong>Phase II: Construction Supervision</strong></p>\n\n<p>The consultant shall have site office, office equipment including computers, furniture and communication facilities, and Joint Laboratory equipment after the first month of the construction period by the works contractor for his site staff.</p>\n\n<p>All documents and correspondence shall be in English</p>\n\n<p>Brief descriptions of the contents of the reports for submission by the Consultant are as follows:</p>\n\n<p><strong>Phase-I</strong></p>\n\n<p>Progress Report</p>\n\n<p>The submission of Progress Report shall be at monthly intervals from the date of the contract and shall give a brief statement of work performed during the preceding month and a schedule of work for the next month.&nbsp; The progress report shall also contain comments and recommendations describing the effects of the accomplishment on future activities and any proposed change to the work plan for a future month.</p>\n\n<p>The submission of the report shall not be later than the first week of each month including idle months, if any, and are serially numbered.</p>\n\n<p>Soils and Materials Report</p>\n\n<p>The soil and materials report shall summarize all the geotechnical findings and adoption of those findings to design.&nbsp; This report shall be a factual report.&nbsp;</p>\n\n<p>Preliminary Design Report</p>\n\n<p>A Preliminary Design Report shall contain the findings of the consultant on the issues of Architectural Design, Structural Design, sanitary, electrical and electromechanical designs for the project with the proposed provisional cost estimate for the client&rsquo;s approval.&nbsp;</p>\n\n<p>The submission of the report shall not be later than 45 days, to have sufficient time for the college&rsquo;s approval and Final Working Design and Working Documents.</p>\n\n<p>Topographic Survey Report</p>\n\n<p>This report contains detail description of the survey report, list of established control pointswith their coordinates, method of approach to the established control points, location of traverse control points, list of indivisible control points, list of scale factor for each established control points, check control points, etc. The report should be detailed so as to make the supervision consultant and the contractor full of survey information and for easy reference during the construction stage.</p>\n\n<p>Complete set of Drawings</p>\n\n<p>The consultant shall prepare and submit a complete set of drawings, which are so required under Item no. 3.2.4 of this section and shall be the final construction drawings with the required type and number.</p>\n\n<p>Engineering Cost Estimate</p>\n\n<p>Confidential Engineering cost estimate of the works based on calculated quantities of the works shall be prepared and submitted.&nbsp; The Consultant shall estimate realistic bill rates based on his assessment of labour, material, plant/equipment, overhead and profit for each individual BOQ item, and come up with a stand-alone cost estimate. The consultant shall compare the project-specific rates with the rates of recent similar construction works in Ethiopia taking into account the location and size of the project as well as the prevailing construction market situation.</p>\n\n<p>Detailed breakdown for each bill item (labour, equipment, material, overhead, profit, and tax) should be part to the priced BOQ. The submission of confidential cost estimate shall conforms to the agreed format with the client.</p>\n\n<p>Tender Documents</p>\n\n<p>The Consultant shall prepare sets of final and complete tender documents for the contract to call for bids on International Competitive Bidding (ICB) for the Building Construction works to implement satisfactorily with the Standard Condition of Contract to be approved by the client.</p>\n\n<p>Consultancy Completion Report</p>\n\n<p>This preparation and submission of completion report is the responsibility of the Consultancy service.&nbsp; It shall be a comprehensive report on the Consultancy services throughout the project. It shall describe the aims of the project, the achievements, any problems encountered and any recommendation made by the consultant, etc.&nbsp; It shall also include the Consultants final statement.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Phase II</strong></p>\n\n<p><strong>(i). Inception Report</strong></p>\n\n<p>Not later than 25 days after the commencement of the Consultant&rsquo;s contract, the Consultant shall submit and present an inception report to the Client. The report shall outline the Consultant&rsquo;s initial findings and confirm the methodology and detailed work program proposed for adoption in the light of initial findings, while also identifying constraints and proposed solutions, together with any action required by the college to facilitate the successful implementation of the Services.</p>\n\n<p><strong>(</strong>ii<strong>). Contractor&rsquo;s Mobilization Report</strong></p>\n\n<p>On completion of the Contractor&rsquo;s mobilization phase, the Consultant shall report on the following:</p>\n\n<p>Contractor&rsquo;s mobilization</p>\n\n<p>Organization and correspondence</p>\n\n<p>Lines of communication</p>\n\n<p>Contractors&rsquo; detailed work programme</p>\n\n<p>Proposed resources schedules</p>\n\n<p>Proposed cash flow</p>\n\n<p>Equipment schedules</p>\n\n<p>Format of forms and their use and presentation</p>\n\n<p>Schedule of site meetings</p>\n\n<p>Contractor&rsquo;s obligations</p>\n\n<p>Any other submitted contractual documentation</p>\n\n<p>&nbsp;</p>\n\n<p><strong>(iii)&nbsp; Monthly Progress Reports</strong></p>\n\n<p>Progress reports shall be prepared monthly using an agreed standard report format to detail progress against programme in respect of all project elements and outputs. During the Implementation Phase, the reports shall additionally include details relating to the quantity of each activity performed, particulars of any non-compliance penalties applied for and comments regarding any quality issues that have arisen.</p>\n\n<p>A suitable number of photographs with date imprint should be included. This will illustrate progress and any difficulties encountered on the site, and&nbsp; will show permanent progress record. The submission of reports are in three copies within two weeks of the reporting period.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>(iv)Quarterly Progress Report</strong></p>\n\n<p>These will be similar to the monthly reports but will be more detailed and include record photographs. The Resident Engineer shall prepare the reports and give an overview of the progress within the project.</p>\n\n<p>The quarterly progress report shall also include important information of the last month of the quarter so that submission of a separate monthly report will not be required for that specific month.</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (v). Annual Progress Report</strong></p>\n\n<p>The report will summarize the activities performed within a year in a format similar to the monthly reports. In particular, it will comment and discuss any trends and serious issues, which may affect the outcome of the Project. The submission of the reportshall be at the end of each fiscal year of Ethiopia (end of June).</p>\n\n<p><strong>(vi). Consultancy Completion Report</strong></p>\n\n<p>This report is to be prepared at the end of the Consultant&rsquo;s Services. It will comprehensively report on the Services throughout the Project. It will describe the aims of the Project, the achievements and lessons learned. It will present detailed financial account details for the Works contract.</p>\n\n<p><strong>(vii). Consultant&rsquo;s Quality Assurance Manual </strong></p>\n\n<p>This manual describes the methodology and procedures to follow in attaining the desired quality of the service at each stage. The report should also detail the assignment of responsibilities with regard to quality assurance to the respective personnel in the team. The content of the manual shall be suggested by the consultant for review by the college and will be finalized following taking into account the comment. The draft manual shall be submitted within one month of the date of effectiveness of the consultancy contract.</p>\n\n<p><strong>(viii). Fit out and commissioning Reports</strong></p>\n\n<p><strong>Phase 1</strong></p>\n\n<p><strong>Table-1- Reporting Type &amp; Submission Deadline</strong></p>\n\n<table align=\"right\" border=\"1\" cellspacing=\"0\" style=\"width:715px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#e6e6e6; height:26.65pt; width:22.7pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#e6e6e6; height:26.65pt; width:140.2pt\">\n\t\t\t<p><strong>Types of Reports/Documents</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#e6e6e6; height:26.65pt; width:189.0pt\">\n\t\t\t<p><strong>Draft</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#e6e6e6; height:26.65pt; width:184.1pt\">\n\t\t\t<p><strong>Final</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e6e6e6; height:13.15pt; width:67.5pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:13.15pt; width:121.5pt\">\n\t\t\t<p><strong>Submission Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:13.15pt; width:58.15pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:13.15pt; width:125.95pt\">\n\t\t\t<p><strong>Submission Date</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.45pt; width:22.7pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:140.2pt\">\n\t\t\t<p>Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; vertical-align:top; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Within one month from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:58.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:33.25pt; width:22.7pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:140.2pt\">\n\t\t\t<p>Monthly Progress Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:67.5pt\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:121.5pt\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:58.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:22.7pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:140.2pt\">\n\t\t\t<p>Geotechnical, Soils and Materials Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:67.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Within one month from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:58.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:22.7pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:140.2pt\">\n\t\t\t<p>Preliminary Design Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:67.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Within two months from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:58.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:22.7pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:140.2pt\">\n\t\t\t<p>Topographic Survey Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:67.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Within one and a half month from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:58.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:22.7pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; vertical-align:top; width:140.2pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Technical Reports</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:67.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:121.5pt\">\n\t\t\t<p>As required by the college</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:58.15pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within two weeks of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:39.25pt; width:22.7pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:140.2pt\">\n\t\t\t<p>Complete set of Drawings,&nbsp; Engineering Cost Estimate and&nbsp; Tender Documents</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:67.5pt\">\n\t\t\t<p>3A3 for drawings and 5 for others</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Not later than 4 months from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:58.15pt\">\n\t\t\t<p>12A3 for drawings and 12 for others</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:125.95pt\">\n\t\t\t<p>Within two weeks of receipt of the Clients comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:39.25pt; width:22.7pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:140.2pt\">\n\t\t\t<p>Final Report and &nbsp;Consultancy completion Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; vertical-align:top; width:67.5pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; vertical-align:top; width:121.5pt\">\n\t\t\t<p>Not later than 4 months from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:58.15pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:125.95pt\">\n\t\t\t<p>Within two weeks of receipt of the Clients comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Phase 2</strong></p>\n\n<p><strong>Table-2- Reporting Type &amp; Submission Deadline</strong></p>\n\n<table align=\"right\" border=\"1\" cellspacing=\"0\" style=\"width:695px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#e6e6e6; height:31.0pt; width:166.15pt\">\n\t\t\t<p><strong>Types of Reports/Documents</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#e6e6e6; height:31.0pt; width:197.65pt\">\n\t\t\t<p><strong>Draft</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#e6e6e6; height:31.0pt; width:157.5pt\">\n\t\t\t<p><strong>Final</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e6e6e6; height:22.65pt; width:31.55pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:22.65pt; width:166.1pt\">\n\t\t\t<p><strong>Submission Date</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:22.65pt; width:31.55pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e6e6e6; height:22.65pt; width:125.95pt\">\n\t\t\t<p><strong>Submission Date</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.45pt; width:166.15pt\">\n\t\t\t<p>Inception Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; vertical-align:top; width:31.55pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:166.1pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Within one month from the commencement of the service</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:31.55pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.45pt; width:125.95pt\">\n\t\t\t<p>Within one week of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:33.25pt; width:166.15pt\">\n\t\t\t<p>Progress Report,</p>\n\n\t\t\t<p>Including measurement and contract administration</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:31.55pt\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:166.1pt\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:31.55pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:33.25pt; width:125.95pt\">\n\t\t\t<p>Not later than the first week of each month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:166.15pt\">\n\t\t\t<p>Technical Reports</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:31.55pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:166.1pt\">\n\t\t\t<p>As built drawings at agreed key milestones</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:31.55pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within two weeks of receipt of the Client&rsquo;s comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:37.0pt; width:166.15pt\">\n\t\t\t<p>Fit out and commissioning</p>\n\n\t\t\t<p>Reports</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:31.55pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:166.1pt\">\n\t\t\t<p>Within 20 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:31.55pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.0pt; width:125.95pt\">\n\t\t\t<p>Within two weeks of receipt of the Clients comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:39.25pt; width:166.15pt\">\n\t\t\t<p>Completion and commissioning Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; vertical-align:top; width:31.55pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:166.1pt\">\n\t\t\t<p>As-built drawings and commissioning within 24 months</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:31.55pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:39.25pt; width:125.95pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Within two weeks of receipt of the Clients comments</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00083414","notice_type":"Request for Expression of Interest","noticedate":"24-Jan-2020","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2020-02-14T00:00:00Z","submission_deadline_time":"15:30","project_ctry_name":"Mozambique","project_id":"P165453","project_name":"Mozambique Energy For All (ProEnergia)","bid_reference_no":"MZ-EDM-146113-CS-CDS","bid_description":"GBV - Mapping of Services for survivors of Sexual Exploration and Abuse","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"AV. AGOSTINHO NETO 70 5o.ANDAR CAIXA POSTAL 759 MAPUTO - MOCAMBIQUE","contact_ctry_name":"Mozambique","contact_email":"silvio.nurmahomed@edm.co.mz","contact_name":"Silvio Romeu  Nurmahomed","contact_organization":"Electricity of Mozambique","contact_phone_no":"[258- 824345725","submission_date":"2020-01-24T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSIONS OF INTEREST</p><p>&nbsp;</p><p><u>MOZAMBIQUE - TEMANE REGIONAL ELECTRICITY PROJECT</u><br />&nbsp;</p><p>Consultant for Support for EdM Environmental and Social Management System</p><p><strong>Selection Based on the Consultants&rsquo; Qualifications (CQS)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;Ref: &nbsp;&nbsp;65/TTP/2018</p><p>&nbsp;</p><p>1. Electricidade de Mo&ccedil;ambique E.P. (&ldquo;EdM&rdquo;), in partnership with Globeleq Africa Limited / EleQtra (&ldquo;Globeleq/EleQtra&rdquo;) and Sasol New Energy Holdings Ltd (&ldquo;Sasol&rdquo;), is developing a 400-MW Independent Power Producer (&ldquo;IPP&rdquo;) project at Temane in the Inhambane Province of Mozambique. The plant will use natural gas from the nearby PSA gas fields, to be developed and operated by Sasol Petroleum Mozambique Lda.</p><p>&nbsp;</p><p>2. The Temane IPP will be connected to the electricity grid in the Maputo area in southern Mozambique through a 560-km, 400-kV line, also including three new substations at Vilankulos, Chibuto and Matalane, known as the Temane Transmission Project (&ldquo;TTP&rdquo;). The TTP is considered Phase 1 of the larger interconnection between Maputo and Tete regions, known as Sociedade Nacional de Transporte de Energia (&ldquo;STE&rdquo;). The TTP will be implemented as a publicly financed project, which will connect the Temane IPP plant and any other future plant along the TTP corridor to the transmission network.&nbsp; The TTP will be structured as a wholly owned EDM subsidiary company.</p><p>&nbsp;</p><p>3. The World Bank Group (WB) is considering financial support to EdM for the TTP project. The WBG maintains high Environmental and Social (E&amp;S) standards on all activities it contributes to fund, and expects EdM to also apply the same international standards on the TTP project (and on the CTT project as associated facility,&nbsp; by EDM engaging with its CTT partners).&nbsp; Consultants are already in the process of preparing WBG standards based ESIAs and RAPs for both the TTP and Temane IPP projects.&nbsp;</p><p>4. A review of the Temane Regional Electricity Project identified the need to strengthen the internal E&amp;S capability and capacity within EdM to manage the TTP project and oversee the E&amp;S aspects of the CTT project (and eventually other EDM owned/managed projects and its supply chain/partner projects) based on WBG standards and requirements and international good practice. The E&amp;S review revealed the following key concerns:</p><p>a) EDM&rsquo;s E&amp;S unit does not have sufficient capacity, it is fragmented, and needs to be consolidated and strengthened;</p><p>b) EDM&rsquo;s Health and Safety (H&amp;S) Specialists are housed in different units, and capacity should be strengthened, and the H&amp;S management be integrated into the ESMS.</p><p>c) EDM needs to develop an integrated Environmental and Social Management System (ESMS) as a reliable and systematic approach to manage, oversee, and report on E&amp;S performance of a growing number of projects.</p><p>5. EdM now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing certain consulting services related to an ESMS gap analysis, system design (including manual) and roadmap development for EDM (Task 1); analysis, design of ESMS and roadmap implementation (Task 2); and monitoring of ESMS performance and ad-hoc support (Task 3).&nbsp; The envisaged duration of the consultancy assignment is one (1) year. &nbsp;Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. &nbsp;The shortlisting criteria for which the Consultant should provide specific information are as follows:</p><p>a) Relevant contracts completed by the Consultant&rsquo;s company within the last five (5) years where ESMS development / implementation management and support services have been provided.&nbsp; Information should include a summary of scope, country, duration and client contact information.</p><p>b) Experience information demonstrating in-depth understanding of the WBG Policies/IFC Performance standards, ISO standards and related ESMS requirements.</p><p>c) CVs of key personnel of the Consultant demonstrating solid knowledge and ESMS experience, including experience working in Africa and preferably in Mozambique.</p><p>6. Consultants will be selected in accordance with the procedures set out in the World Bank&rsquo;s Guidelines: &ldquo;Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers (January 2011 and Revised July 2014)&rdquo;, using &ldquo;Selection Based on the Consultants&rsquo; Qualifications (CQS)&rdquo;.</p><p>&nbsp;</p><p>7. Expression of Interest must be submitted in English in a sealed envelope and delivered by courier or electronically on or before 14th &nbsp;February 2020 at 15.30h local time, and be clearly marked <strong>Expression of Interest for: Consultancy Services for Mozambique Temane Regional Electricity Project &ndash; ESMS Support</strong>.</p><p>The address for submission of Expression of Interest shall be:</p><p>&nbsp;</p><p>&nbsp;EDM STE Project Office</p><p>&nbsp;Attn: Antonio Munguambe, Deputy Project Director</p><p>&nbsp;Av.&nbsp; Zedequias Manganhela No. 267</p><p>&nbsp;Pr&eacute;dio JAT IV, 1&ordm; andar</p><p>&nbsp;P.O. Box 2532,</p><p>&nbsp;Maputo, Mozambique</p><p>&nbsp;Tel: +258 21 501400 or +258 21 501405</p><p>&nbsp;E-mail: Antonio.Munguambe@edm.co.mz</p><p>&nbsp;</p>"},{"id":"OP00061578","notice_type":"Request for Expression of Interest","noticedate":"20-Nov-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2018-12-04T00:00:00Z","submission_deadline_time":"00:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P160427","project_name":"Temane Regional Electricity Project","bid_reference_no":"67/STE/2018","bid_description":"Environmental & Social Management System Support","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"AV. AGOSTINHO NETO 70 5o.ANDAR CAIXA POSTAL 759 MAPUTO - MOCAMBIQUE","contact_ctry_name":"Mozambique","contact_email":"Antonio.Munguambe@edm.co.mz","contact_name":"Antonio Joao Munguambe","contact_organization":"Electricity of Mozambique","contact_phone_no":"258 847139443","submission_date":"2018-11-20T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>&nbsp;</p><p><strong><em><u>MOZAMBIQUE - TEMANE REGIONAL ELECTRICITY PROJECT</u></em></strong><br />&nbsp;</p><p><strong>Consultant for Support for EdM Environmental and Social Management System </strong></p><p><strong>Selection Based on the Consultants&rsquo; Qualifications (CQS)</strong></p><p>&nbsp;</p><p>&nbsp;Date: 19 November, 2018&nbsp;</p><p>&nbsp;Ref: &nbsp;&nbsp;67/STE/2018</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Electricidade de Mo&ccedil;ambique E.P. (&ldquo;EdM&rdquo;), in partnership with Globeleq Africa Limited / EleQtra (&ldquo;Globeleq/EleQtra&rdquo;) and Sasol New Energy Holdings Ltd (&ldquo;Sasol&rdquo;), is developing a 400-MW Independent Power Producer (&ldquo;IPP&rdquo;) project at Temane in the Inhambane Province of Mozambique. The plant will use natural gas from the nearby PSA gas fields, to be developed and operated by Sasol Petroleum Mozambique Lda.</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Temane IPP will be connected to the electricity grid in the Maputo area in southern Mozambique through a 560-km, 400-kV line, also including three new substations at Vilankulos, Chibuto and Matalane, known as the Temane Transmission Project (&ldquo;TTP&rdquo;). The TTP is considered Phase 1 of the larger interconnection between Maputo and Tete regions, known as Sociedade Nacional de Transporte de Energia (&ldquo;STE&rdquo;). The TTP will be implemented as a publicly financed project, which will connect the Temane IPP plant and any other future plant along the TTP corridor to the transmission network.&nbsp; The TTP will be structured as a wholly owned EDM subsidiary company.</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The World Bank Group (WB) is considering financial support to EdM for the TTP project. The WBG maintains high Environmental and Social (E&amp;S) standards on all activities it contributes to fund, and expects EdM to also apply the same international standards on the TTP project (and on the CTT project as associated facility,&nbsp; by EDM engaging with its CTT partners).&nbsp; Consultants are already in the process of preparing WBG standards based ESIAs and RAPs for both the TTP and Temane IPP projects.&nbsp;</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A review of the Temane Regional Electricity Project identified the need to strengthen the internal E&amp;S capability and capacity within EdM to manage the TTP project and oversee the E&amp;S aspects of the CTT project (and eventually other EDM owned/managed projects and its supply chain/partner projects) based on WBG standards and requirements and international good practice. The E&amp;S review revealed the following key concerns:</p><p>a.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; EDM&rsquo;s E&amp;S unit does not have sufficient capacity, it is fragmented, and needs to be consolidated and strengthened;</p><p>b.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; EDM&rsquo;s Health and Safety (H&amp;S) Specialists are housed in different units, and capacity should be strengthened, and the H&amp;S management be integrated into the ESMS.</p><p>c.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; EDM needs to develop an integrated Environmental and Social Management System (ESMS) as a reliable and systematic approach to manage, oversee, and report on E&amp;S performance of a growing number of projects.</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; EdM now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing certain consulting services related to an ESMS gap analysis, system design (including manual) and roadmap development for EDM (Task 1); analysis, design of ESMS and roadmap implementation (Task 2); and monitoring of ESMS performance and ad-hoc support (Task 3).&nbsp; The envisaged duration of the consultancy assignment is one (1) year. &nbsp;Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. &nbsp;The shortlisting criteria for which the Consultant should provide specific information are as follows:</p><p>a.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Relevant contracts completed by the Consultant&rsquo;s company within the last five (5) years where ESMS development / implementation management and support services have been provided.&nbsp; Information should include a summary of scope, country, duration and client contact information.</p><p>b.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Experience information demonstrating in-depth understanding of the WBG Policies/IFC Performance standards, ISO standards and related ESMS requirements.</p><p>c.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CVs of key personnel of the Consultant demonstrating solid knowledge and ESMS experience, including experience working in Africa and preferably in Mozambique.</p><p>&nbsp;</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Consultants will be selected in accordance with the procedures set out in the World Bank&rsquo;s Guidelines: &ldquo;Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers (January 2011 and Revised July 2014)&rdquo;, using &ldquo;Selection Based on the Consultants&rsquo; Qualifications (CQS)&rdquo;.</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Expression of Interest must be submitted in English in a sealed envelope and delivered by courier or electronically on or before 04 December&nbsp; 2018 at 15.30h local time, and be clearly marked <strong>Expression of Interest for: Consultancy Services for Mozambique Temane Regional Electricity Project &ndash; ESMS Support</strong>.</p><p>The address for submission of Expression of Interest shall be:</p><p><em>&nbsp;EDM STE Project Office</em></p><p>&nbsp;Attn: Antonio Munguambe, Deputy Project Director</p><p><em>&nbsp;Av.&nbsp; Zedequias Manganhela No. 267</em></p><p>&nbsp;Pr&eacute;dio JAT IV, 1&ordm; andar</p><p><em>&nbsp;P.O. Box 2532,</em></p><p><em>&nbsp;Maputo, Mozambique</em></p><p>&nbsp;Tel: +258 21 501400 or +258 21 501405</p><p><em>&nbsp;E-mail: Antonio.Munguambe@edm.co.mz</em></p><p>&nbsp;</p>"},{"id":"OP00061129","notice_type":"Request for Expression of Interest","noticedate":"08-Nov-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2018-11-22T00:00:00Z","submission_deadline_time":"16:30","project_ctry_name":"Eastern and Southern Africa","project_id":"P145566","project_name":"Southern Africa Trade and Transport Facilitation (Phase 2) Project","bid_reference_no":"MW-RA-68179-CS-CQS","bid_description":"Consultancy Services for Design review, Detailed Engineering Design, Preparation of Tender  Documents and Supervision of Refurbishment of Health  and Dispatch Centers","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Private Bag B346\r\nLilongwe","contact_ctry_name":"Malawi","contact_email":"mmalinda@ra.org.mw","contact_name":"Moses Malinda","contact_organization":"The Roads Authority","contact_phone_no":"888843923","contact_web_url":"www.ra.org.mw","submission_date":"2018-11-08T00:00:00Z","notice_text":"<table border=\"0\" cellpadding=\"0\" cellspacing=\"1\" style=\"width:561px\"><tbody><tr><td style=\"height:284px; width:557px\"><p>&nbsp;</p><p><strong>ROADS AUTHORITY</strong></p><p>&nbsp;</p><p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>MALAWI:&nbsp;&nbsp;&nbsp;&nbsp; TRANSPORT SECTOR </strong></p><p>&nbsp;</p><p><strong>NAME OF PROJECT - </strong>Southern Africa Trade and Transport Facilitation Program - SOP2</p><p>&nbsp;</p><p><strong>Credit No.:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 5622-MAI</strong></p><p>&nbsp;</p><p><strong>PROJECT ID:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; P145566</strong></p><p>&nbsp;</p><p><strong>Assignment Title: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>Consulting Services for Review, Preparation of Detailed Design, Specifications, Bills of Quantities and Supervision of Construction/Refurbishment Works for Trauma Units in 6 Health Facilities and two dispatch sites under Malawi Emergency Medical Service (EMS) Pilot along M1 road between Lilongwe and Blantyre</p><p>on the North-South Corridor</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Reference No</strong>.: MW-RA-68179-CS-CQS</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>The Government of Malawi (GOM) has received financing from the World Bank towards the cost of the second phase of the Southern Africa Trade and Transport Facilitation Program (SATTFP) -SOP2, and intends to apply part of the proceeds for consulting services above.</p><p>&nbsp;</p><p>Improving health services and emergency response is a sub-component of the second phase of the Southern Africa Trade and Transport Facilitation Program (SATTFP- SOP2) which aims at fulfilling the Project Development Objective (PDO), that is to facilitate the movement of goods and people along the North-South Corridor and at the key border crossings in Malawi, whilst supporting improvements in road safety and health services along the corridor. Under this sub-component, the project is expected to refurbish and extend trauma care facilities in priority health centres and provide technical assistance to develop the capacity of the staff in the local health facilities. The project is supporting an emergency response service for road traffic accidents as a pilot on a defined section of the M1 road from Lilongwe to Blantyre as recommended by the assessment of trauma care and emergency response to road traffic accidents (RTAs) carried out with funding from the Global Road Safety Facility (GRSF).</p><p>The overall objective of sub-component is to develop health and emergency systems that will respond to road traffic accidents (RTAs), with the aim of mitigating deaths that occur from the scene of accident to hospital. The project expects to improve safety measures and efficiency through the provision of Trauma units and Dispatch sites that are near the M1 road and easily accessible from high accident zones on the road. Specific attention is paid to communications, first responders<strong>, </strong>pre-hospital emergency medical services and in-hospital trauma care.</p><p>The consulting services (&quot;the Services&quot;) include Consulting Services to assist the Government of Malawi, more specifically the Ministry of Health and the Roads Authority (RA), the implementing agency for the project to:</p><p>&nbsp;</p><ol><li>Review available drawings, survey and assessment of targeted buildings</li><li>Prepare Detailed Designs, Specifications and Bills of Quantities (BOQs) and bidding documents</li><li>Supervise construction/refurbishment of works for the trauma units and dispatch sites during implementation and during defects liability period to ensure that the works are completed in accordance with the requirements of the Construction Contract Documents.</li></ol><p>&nbsp;</p><p>The Government of Malawi represented by the Roads Authority now invites eligible consulting firms (&quot;Consultants&quot;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><ol><li>Number of similar assignments;</li><li>Field of specialization of the firm;</li><li>Experience in carrying out design reviews/feasibility studies, detailed designs, preparation of tender documents and construction supervision assignments within the last five (5) years;</li><li>Technical and Managerial capability of the firm. (Provide only the structure of the organization, general qualifications and experience, and number of key staff. Do not provide detailed CV of the staff. Experts will not be evaluated at the shortlisting stage;</li><li>Experience in similar working conditions.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank&#39;s <em>Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits &amp; Grants by World Bank Borrowers</em> of January 2011, revised 2014 (&quot;Consultant Guidelines&quot;), setting forth the World Bank&#39;s policy on conflict of interest.&nbsp;&nbsp;&nbsp;</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Selection Based on Consultant&rsquo; s Qualification (CQS) selection method set out in the Consultant Guidelines.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours <em>i.e</em>. 0800 to 1630 hours local time.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by 22nd November, 2018, 16:30 hours local time.</p><p>&nbsp;</p><p>The IPDC Chairperson, Roads Authority</p><p>Attn: Moses Malinda &ndash; Procurement Specialist</p><p>Functional Building - Off Paul Kagame Road</p><p>Private Bag B346, Lilongwe 3</p><p>Malawi</p><p>Tel: +265 1 753 699</p><p>Fax: +265 1 750 307</p><p>Email: mmalinda@ra.org.mw / ra@ra.org.mw</p><p>Website: www.ra.org.mw</p></td></tr></tbody></table>"},{"id":"OP00059722","notice_type":"Request for Expression of Interest","noticedate":"14-Oct-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2018-10-29T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Liberia","project_id":"P162893","project_name":"Liberia Land Administration Project","bid_reference_no":"LR-LLA-42917-CS-INDV","bid_description":"Baseline Survey - Local organization","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Old WFP Building \r\nMamba Point \r\nMonrovia, Liberia","contact_ctry_name":"Liberia","contact_email":"jocojayjay@gmail.com","contact_name":"Louis JayJay","contact_organization":"Liberia Land Authority","contact_phone_no":"0888621906","submission_date":"2018-10-14T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSIONS OF INTEREST</p><p><strong>CONSULTING SERVICES-FIRM SELECTION&nbsp;</strong><br /><strong>Reference No.: LR-LLA-42917-CS-INDV</strong></p><p>&nbsp;</p><p><strong>Republic of Liberia</strong></p><p><strong>Liberia Land Administration Project (LLAP)</strong></p><p><strong>Project ID No.: P162893</strong></p><p><strong>Grant No.: D237-LR</strong></p><p>&nbsp;</p><p>The Government of Liberia has received financing from the International Development Association (IDA) towards the cost of implementing the Liberia Land Administration Project (LLAP) by the Liberia Land Authority and intends to apply part of the proceeds of this financing for engaging the services of a consulting firm. With the support of donor partners, several public awareness campaigns and consultations with stakeholders on land reform have taken place, especially during the tenure of the Land Commission. Notwithstanding, government institutions, key stakeholders and the general public, including communities across Liberia, have limited understanding of the ongoing land sector reform.&nbsp;&nbsp;Some communities have indicated that they are not adequately consulted by central government authorities on land issues and sector reform.&nbsp;</p><p>Furthermore, there seems to be inadequate information and awareness campaigns on some of the products of the on-going land reform, including the Land Rights Policy, draft Land Rights Act, and the Act that created the Liberia Land Authority, as related to its mandate, functions, and institutional arrangements both at the central and local levels. Also, there have been little, if any, engagements with key stakeholders, including communities on the objectives and activities of the LLAP.</p><p>&nbsp;</p><p>In order to assess the understanding of the public, government, and other key stakeholders, including local authorities and communities about the LLA, its role and mandate, as well as broader land sector reform, the Liberia Land Authority through the LLAP is to conduct a baseline survey for public awareness on the LLA and land sector reform, and stakeholder consultations on the objectives and activities of the LLAP.&nbsp;&nbsp;Data from the survey will provide the baseline for the LLAP indicator on the public&rsquo;s awareness of the LLA and land sector reform, as well as to set a benchmark of progress made in providing awareness about the LLA to the general public, government entities, and other stakeholders that will be measured during the mid-term evaluation and end of the project evaluation&nbsp;</p><p>In order to increase public awareness on the LLA and the on-going land sector reform, the LLA has developed a Communication Strategy, which when fully implemented, will help to bridge the information and communication gap and ultimately broaden the citizens&rsquo; awareness of the Authority and the current reforms in the sector.</p><p>&nbsp;</p><p>The baseline survey will focus on the baseline data collection for the indicator on increase of awareness of the general public and government entities about the LLA and its mandate as outlined in the Results Framework of the Liberia Land Administration Project Appraisal Document (PAD). In addition, given that the passage of the Land Rights Act (LRA) was delayed due to on-going internal review by the Government of Liberia, it was not included in the results framework of the LLAP Appraisal Document. Accordingly, and in consideration of the fact that the LRA has been enacted into law, public awareness in this regard should also take center stage.&nbsp;&nbsp;The baseline survey report will be used as measurement during the mid-term evaluation and end of the project evaluation.</p><p>&nbsp;</p><p>The baseline survey aims to achieve the objective of collecting data on the level of awareness and understanding of the general public, government entities, and other key stakeholders, including local authorities and communities about the LLA, its role and mandate, as well as broader land sector reform.&nbsp;</p><p>&nbsp;</p><p>The consulting firm will be required to lead on the below tasks in consultation with the Liberia Land Authority:</p><p>&nbsp;</p><p>Develop a gender-sensitive baseline methodology for conducting the study; and in particular:&nbsp;</p><p>&nbsp;</p><ol><li>Hold inception meeting with the LLA and the Project Implementation Unit (PIU) and conduct a review of key relevant documents and understanding of the Liberia Land Administration Project design and contextual framework;</li><li>Develop detailed inception report and design research tools and methodology for data collection of both quantitative and qualitative data, including a clear sampling approach as well as a work plan. The research design needs to capture data that will be utilized to set benchmark for mid-term and end of project evaluations;</li><li>Develop field manual</li><li>Review the qualifications of enumerators for selection and provide training to ensure that standardized and application of the research tools are fully understood by the enumerators.</li><li>Field test the baseline survey tools with a small sample size;</li><li>Implement and supervise field data collection and entry;</li><li>Analyze and synthesize data and prepare draft report;</li><li>Submit data analysis and draft report for feedback;</li><li>Incorporate feedback, compile and submit final report.</li></ol><p>&nbsp;</p><p><strong>Expected output</strong></p><p>The consulting firm will be required to deliver the following:</p><ul><li>An Inception report, including a work plan, the proposed methodology, and field manual for the study;</li><li>A comprehensive draft baseline survey report submitted in both electronic and signed hard copies, including findings and recommendations; The baseline survey report will help to establish the names of community radio stations currently operating in targeted counties, wave band operating on, coverage area and estimate target population.</li><li>Systematic baseline database produced and delivered along with the draft report;</li><li>PowerPoint presentation of draft report for review and comments</li></ul><p>Finalized and submit report based on inputs from PowerPoint presentation</p><p>&nbsp;</p><p>Detailed Terms of Reference for the assignment can be obtained from the e-mansion website at&nbsp;www.emansion.gov.lr&nbsp;&nbsp;&nbsp;</p><p>&nbsp;</p><p>The Liberia Land Authority now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the services.&nbsp;&nbsp;Interested Consultants must provide information demonstrating that they have the required qualifications and relevant experience to perform the services. The shortlisting criteria are:&nbsp;&nbsp;</p><p>&nbsp;</p><p>The Consulting Firm is expected to have the following qualifications:</p><ol><li>Should have at least five years&rsquo; experience of conducting project baselines, evaluations and researches, particularly of land-related projects;</li><li>Should have a team having experience of working on land issues;&nbsp;</li><li>Should have strong organizational credibility, logistics, and systems to carry out such assignments;&nbsp;</li><li>Demonstrated experience of working in Liberia</li><li>Demonstrated expertise in data analysis, including statistical methodologies and related research techniques;</li><li>Proven track record of on-time performance;&nbsp;</li><li>Demonstrated ability to write clear, brief, analytical reports.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to paragraph 3.16 to 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers (Regulations) dated July 1, 2016 and revised November 1, 2017, setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>The Consultancy Firm must not associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications.&nbsp;</p><p>&nbsp;</p><p>A Consultancy Firm will be selected in accordance with the Consultants&rsquo; Qualifications Selection Method set out in the Consultants&rsquo; Guidelines.&nbsp;</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours&nbsp;<strong>9:00am to 4:00 pm </strong>(local time), Mondays through Fridays.</p><p>&nbsp;</p><p>Expressions of interest must be submitted through e-mail by&nbsp;<strong>4:00 pm local time on Monday, October 29, 2018. The subject of email must be &ldquo;Baseline Survey for Public Awareness and Stakeholder Consultations&rdquo;</strong>.</p><p>The Liberia Land Administration Project (LLAP)</p><p>Attn: Project Coordinator&nbsp;</p><p>Old WFP Building&nbsp;</p><p>Mamba Point&nbsp;</p><p>Monrovia, Liberia</p><p>Tel: +231775192051&nbsp;</p><p>E-mail:&nbsp;worldbankllap@gmail.com</p><p>Cc: jocojayjay@gmail.com&nbsp;&nbsp;</p><p>&nbsp;</p><p>The Liberia Land Authority is a gender-sensitive institution. Females are encouraged to apply.&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Terms of Reference</strong></p><p>&nbsp;</p><p><strong>Baseline survey for Public Awareness and Stakeholder Consultations</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong>BACKGROUND&nbsp;</strong></p><p>The Liberia Land Administration Project (LLAP) is supporting the Government of Liberia to strengthen the capacity of the Liberia Land Authority (LLA) and establish a land administration system. The Project will be financed through a World Bank grant of US$ 7 million.&nbsp;&nbsp;The project started on March 22, 2018 and is expected to close in October 2022.&nbsp;</p><p>&nbsp;</p><p>The LLAP has four components. Component 1 (Support to the Liberia Land Authority) will focus on: developing land laws/regulations and administrative procedures; developing business systems, plans and processes, and a strategic investment strategy for financial sustainability; capacity building; communication and awareness raising; and acquisition of office equipment, furniture, supplies and vehicles necessary for conducting the work of the LLA and the Project. Component 2 (Support for inventory and analysis of tribal land certificates) will support an inventory of tribal land certificates in several counties and the establishment of a database for further analysis. Component 3 (Development of a land administration system) will support assessments and pilots to determine best methods for collecting, recording and managing land rights information; establish a geodetic network; and support land valuation and management of government and public lands. Component 4 (Project Coordination, Monitoring and Evaluation) will support the project implementation, including the establishment of a Project Implementation Unit (PIU).</p><p>&nbsp;</p><p>With the support of donor partners, several public awareness campaigns and consultations with stakeholders on land reform have taken place, especially during the tenure of the Land Commission. Notwithstanding, government institutions, key stakeholders and the general public, including communities across Liberia, have limited understanding of the ongoing land sector reform.&nbsp;&nbsp;Some communities have indicated that they are not adequately consulted by central government authorities on land issues and sector reform. Furthermore, there seems to be inadequate information and awareness campaigns on some of the products of the on-going land reform, including the Land Rights Policy, draft Land Rights Act, and the Act that created the Liberia Land Authority, as related to its mandate, functions, and institutional arrangements both at the central and local levels. Also, there have been little, if any, engagements with key stakeholders, including communities on the objectives and activities of the LLAP.</p><p>&nbsp;</p><p>In order to assess the understanding of the public, government, and other key stakeholders, including local authorities and communities about the LLA, its role and mandate, as well as broader land sector reform, the Liberia Land Authority through the LLAP is to conduct a baseline survey for public awareness on the LLA and land sector reform, and stakeholder consultations on the objectives and activities of the LLAP.&nbsp;&nbsp;Data from the survey will provide the baseline for the LLAP indicator on the public&rsquo;s awareness of the LLA and land sector reform, as well as to set a benchmark of progress made in providing awareness about the LLA to the general public, government entities, and other stakeholders that will be measured during the mid-term evaluation and end of the project evaluation&nbsp;</p><p>.</p><p>&nbsp;</p><p>In order to increase public awareness on the LLA and the on-going land sector reform, the LLA has developed a Communication Strategy, which when fully implemented, will help to bridge the information and communication gap and ultimately broaden the citizens&rsquo; awareness of the Authority and the current reforms in the sector.</p><p>&nbsp;</p><p><strong>Objectives of the Baseline Survey</strong></p><p>&nbsp;</p><p>The baseline survey will focus on the baseline data collection for the indicator on increase of awareness of the general public and government entities about the LLA and its mandate as outlined in the Results Framework of the Liberia Land Administration Project Appraisal Document (PAD). In addition, given that the passage of the Land Rights Act (LRA) was delayed due to on-going internal review by the Government of Liberia, it was not included in the results framework of the LLAP Appraisal Document. Accordingly, and in consideration of the fact that the LRA has been enacted into law, public awareness in this regard should also take center stage.&nbsp;&nbsp;The baseline survey report will be used as measurement during the mid-term evaluation and end of the project evaluation.</p><p>&nbsp;</p><p>The baseline survey aims to achieve the objective of collecting data on the level of awareness and understanding of the general public, government entities, and other key stakeholders, including local authorities and communities about the LLA, its role, and mandate, as well as broader land sector reform.&nbsp;</p><p>&nbsp;</p><p>Further, the survey will inform the design of future communication and awareness-raising campaigns by identifying specific target groups, appropriate communication channels for each target group, and potential key messages for every target group.</p><p>&nbsp;</p><p><strong>Data collection and Methodology of the baseline study</strong></p><p>&nbsp;</p><p>In order to conduct the baseline study, the LLA expects the consulting firm to employ both quantitative and qualitative methods for data collection. The consulting firm is also expected to utilize the following methodologies:</p><p>&nbsp;</p><ol><li>The survey will focus on selected individuals and groups in rural and urban communities in Liberia who will be interviewed through town hall meetings, questionnaires, focus group discussions, etc.;</li><li>Selected staff of government ministries, agencies and commissions will be engaged through Key informant interviews;</li><li>Focus group discussions with selected government institutions, private institutions and civil society organizations.</li></ol><p>&nbsp;</p><p><strong>Scope of work</strong></p><p>&nbsp;</p><p>The baseline study will be conducted within the administrative sub-divisions of Liberia. The baseline survey shall be conducted in forms of questionnaires, key informant interviews and focus group discussions if needed. The information will be collected, analyzed and the report will inform LLA management about the general public and government entities knowledge about the LLA and its mandates, including the passage into law of the LRA.&nbsp;</p><p>&nbsp;</p><p>The consulting firm will be required to lead on the below tasks in consultation with the Liberia Land Authority:</p><p>&nbsp;</p><p>Develop a gender-sensitive baseline methodology for conducting the study, and in particular:&nbsp;</p><p>&nbsp;</p><ol><li>Hold inception meeting with the LLA and the Project Implementation Unit (PIU) and conduct a review of key relevant documents and understanding of the Liberia Land Administration Project design and contextual framework;</li><li>Develop detailed inception report and design research tools and methodology for data collection of both quantitative and qualitative data, including a clear sampling approach as well as a work plan. The research design needs to capture data that will be utilized to set benchmark for mid-term and end of project evaluations;</li><li>Develop field manual</li><li>Review the qualifications of enumerators for selection and provide training to ensure that standardized and application of the research tools are fully understood by the enumerators.</li><li>Field test the baseline survey tools with a small sample size;</li><li>Implement and supervise field data collection and entry;</li><li>Analyze and synthesize data and prepare a draft report;</li><li>Submit data analysis and draft report for feedback;</li><li>Incorporate feedback, compile and submit final report.</li></ol><p>&nbsp;</p><p><strong>Expected output</strong></p><p>The consulting firm will be required to deliver the following:</p><ul><li>An Inception report, including a work plan, the proposed methodology, and field manual for the study;</li><li>A comprehensive draft baseline survey report submitted in both electronic and signed hard copies, including findings and recommendations; The baseline survey report will help to establish the names of community radio stations currently operating in targeted counties, wave band operating on, coverage area and estimate target population.</li><li>Systematic baseline database produced and delivered along with the draft report;</li><li>Power Point presentation of draft report for review and comments</li><li>Finalized and submit report based on inputs from Power Point presentation</li></ul><p>&nbsp;</p><p><strong>&nbsp;Duration and timeline</strong></p><p>The baseline survey is expected to last for the period of two (90) days beginning the commencement of signing of the consulting service contract.</p><p>&nbsp;</p><p><strong>Report format</strong></p><p>The draft report of minimum 20 but no more than 30 pages (excluding executive summary, table of content and annexes) will be shared with the LLA for revision and incorporation of feedback where needed. The final comprehensive baseline report will include the following:</p><p>&nbsp;</p><ul><li>Title page</li><li>Acknowledgement&nbsp;</li><li>Acronym list</li><li>Executive summary</li><li>Table of contents&nbsp;</li><li>Introduction/Background&nbsp;&nbsp;&nbsp;</li><li>Methodology, sampling approach and scope of study</li><li>Limitation&nbsp;</li><li>Analysis of Findings&nbsp;</li><li>Conclusion and Recommendations</li><li>Literature list</li><li>Annexes/appendices</li></ul><p>&nbsp;</p><p><strong>Qualification</strong></p><p>&nbsp;</p><p>The Consulting Firm is expected to have the following qualifications:</p><ol><li>Should have at least five years&rsquo; experience of conducting project baselines, evaluations and researches, particularly of land related projects;</li><li>Should have a team having experience of working on land issues;&nbsp;</li><li>Should have strong organizational credibility, logistics, and systems to carry out such assignments;&nbsp;</li><li>Demonstrated experience of working in Liberia</li><li>Demonstrated expertise in data analysis, including statistical methodologies and related research techniques;</li><li>Proven track record of on-time performance;&nbsp;</li><li>Demonstrated ability to write clear, brief, analytical reports.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>Lead Researcher&nbsp;</strong></p><p>&nbsp;</p><p><strong><u>Academic Qualification</u></strong><strong>:&nbsp;&nbsp;</strong>Advanced university degree (MSC or equivalent. PHD preferred) in one of the key areas of expertise (sociology, communication monitoring and evaluation) or other related educational background<strong>.</strong></p><p>&nbsp;</p><p><strong><u>Experience:&nbsp;</u></strong></p><p>1) At least ten (10) years of progressive and responsible professional experience in conducting researches, project baseline and studies, evaluations and other related areas.</p><p>2) Demonstrated experience in working with national governments, communities, and diverse stakeholder groups.</p><p>3) Reasonable experience in applying or engaging in community participatory approaches to Land Right issues&nbsp;</p><p>4) At least 5 listed projects undertaking similar assignments is required, with description of work and specific role.</p><p>5) Demonstrated knowledge and experience in data gathering, analysis, enumeration, etc</p><p>&nbsp;</p><p><strong><u>Competencies:&nbsp;</u></strong>&nbsp;&nbsp;&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;1) Timely delivery of high quality analytical work&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;2) Strong problem-solving skills&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;3) Excellent command of written and oral English is required&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;4) Strong technical report writing skills&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p><strong>Lead Analyst&nbsp;</strong></p><p>&nbsp;</p><p><strong><u>Academic qualifications</u></strong><strong>: 1)&nbsp;</strong>Advanced degree in sociology, communication, monitoring and evaluation, and other related studies</p><p>&nbsp;</p><p><strong><u>Experience:&nbsp;</u></strong></p><ul><li>At least 8 years of progressively responsible and related professional experience&nbsp;</li><li>Experience in data Acquisition and Analysis&nbsp;</li><li>At least 3 listed experience assignments in undertaking baseline assessment with governments, NGOs and verifiable refutable institution&nbsp;</li></ul><p>&nbsp;</p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<u>Competences:&nbsp;</u></strong></p><ul><li>Strong technical report writing and data analysis skills</li><li>High proficiency with contemporary software such as MS Office Suite, database management&nbsp;</li><li>Excellent interpersonal communication skills&nbsp;</li><li>Ability to meet deadlines and prioritize multiple tasks</li></ul><p>&nbsp;</p><p><strong>Institutional Arrangements&nbsp;</strong></p><p>The Firm will report to the Project Coordinator but will liaise directly with the Commissioner on Policy and Planning or Technical Focal Person within the Policy and Planning Department, along with relevant senior staff, including Commissioners, the Executive Director, the LLA Project Director, and relevant staff of the PIU.&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00055641","notice_type":"Request for Expression of Interest","noticedate":"18-Jul-2018","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2019-01-25T00:00:00Z","submission_deadline_time":"08:00","project_ctry_name":"Botswana","project_id":"P102368","project_name":"Integrated Transport","bid_reference_no":"BW-MTC-25507-CS-QBS","bid_description":"A2.6 National consulting and construction industry development","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"MTC headquarters, plot 54690, Westgate Mall Gaborone, Botswana","contact_ctry_name":"Botswana","contact_email":"mbaele@gov.bw","contact_name":"Mmoloki  Baele","contact_organization":"Ministry of Transport","contact_phone_no":"267 391 3511","submission_date":"2018-07-18T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSIONS OF INTEREST</p>\r\n\r\n<p>(CONSULTING SERVICES &ndash; FIRMSELECTION)</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>BOTSWANA INTEGRATED TRANSPORT PROJECT:</p>\r\n\r\n<p>LOAN NO. 7713-BW</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Assignment Title: Consultancy Services for the investigation and training of the National Consulting and Construction Industry in Botswana </strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Reference No</strong>. (as per Procurement Plan): BW-MTC-25507-CS-QBS</p>\r\n\r\n<p><strong>MTC Tender Number: MTC 240/5/9/2018-2019 (I)</strong></p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Government of the Republic of Botswana has received financing from the World Bank toward the cost of the Botswana Integrated Transport Project (BITP), and intends to apply part of the proceeds for consulting services.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The assignment aims to provide the necessary capacity building and infrastructure improvement, which will, in turn, increase the competitive edge required for the opening up of the opportunity for export diversification through identifying the industry needs and subsequently training the both the construction and consultants industry with the implementation period of two years.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Background</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Government of the Republic of Botswana continues to face a number of development challenges in its continuing forward march for progress.&nbsp; The country&rsquo;s relatively narrow economic base in diamond mining has resulted in the benefits of development not being broadly shared.&nbsp; At this juncture it is therefore essential to diversify, putting increasing reliance on the private sector to lead activities in manufacturing agro-processing and services.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>In pursuit of this, the Government of Botswana through the Ministry of Transport and Communications (MT&amp;C), together with the World Bank (WB), is currently in the process of implementing the Botswana Integrated Transport Project [BITP] designed to assist in the restructuring, modernising and, provision of the planning necessary for the entire transport system into the future.&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The purpose of this assignment is therefore; to investigate the current challenges faced by the industry, draft a road map on how the industry can be developed and recommend to both address any capacity gaps and to assist the development of the industry.</p>\r\n\r\n<p>Project Objective</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The purpose of this assignment is to investigate the current challenges faced by the industry, draft a road map on how the industry can be developed and recommend to the Client both how to address any capacity gaps and assist the development of the industry through the implementation of training programs suited to address the recommendations.</p>\r\n\r\n<p>Specific Objectives</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The objectives of the Study is divided into two Phases. Phase 1 will focus on the industry review and mapping the way forward for the local construction industry. Specific tasks are:</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ul>\r\n\t<li>Follow up with relevant stakeholders for the better understanding of the status quo which will help in making an informed decision</li>\r\n\t<li>Develop a comprehensive report on the state of the industry as is and draw up a road map with mitigations on how it can be effectively operating, and</li>\r\n\t<li>Recommend a training program to address the gaps identified during the study and to assist the consulting and contracting industry to develop further.</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Phase 2 will focus on the implementation of the training programs and will include the following;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<ul>\r\n\t<li>Review the already identified courses and suggest modification if required</li>\r\n\t<li>Draft the recommended training needs, including any of the already identified courses for approval by the Ministry.</li>\r\n\t<li>After Client&rsquo;s decision, assist with the implementation of the training through detailed development of the curricula, identification of relevant training institutions and assisting the Client with the implementation thereof.</li>\r\n</ul>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The Ministry of Transport and Communications now invites eligible consulting firms/Training Institutions (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The required competencies are summarised in the following knowledge areas (i)Contracting/Consulting Industry Management; (ii) Training needs analysis and (iii) Developing and delivering training programs.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The key experts to be engaged on the project are those who will study the industry and will manage the training programs.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank&rsquo;s <em>Guidelines: Selection and Employment of Consultants [under IBRD Loans and IDA Credits &amp; Grants] by World Bank Borrowers</em> January 2011 (revised July 2014) (&ldquo;Consultant Guidelines&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to the following specific information on conflict of interest related to this assignment:&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p><strong>Conflict of Interest </strong></p>\r\n\r\n<p>1.9 Bank policy requires that consultants provide professional, objective, and impartial advice and at all times hold the client&rsquo;s interests paramount, without any consideration for future work, and that in providing advice they avoid conflicts with other assignments and their own corporate interests. Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interest of the Borrower. Without limitation on the generality of the foregoing, consultants shall not be hired under the circumstances set forth below:</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>(a) Conflict between consulting activities and procurement of goods, works, or non-consulting services (i.e., services other than consulting services covered by these Guidelines8): A firm that has been engaged by the Borrower to provide goods, works, or non-consulting services for a project, or any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm, shall be disqualified from providing consulting services resulting from or directly related to those goods, works, or non-consulting services. Conversely, a firm hired to provide consulting services for the preparation (before Loan effectiveness) or implementation of a project, or any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm, shall be disqualified from subsequently providing goods, works, or services (other than consulting services covered by these Guidelines) resulting from or directly related to the consulting services for such preparation or implementation. This provision does not apply to the various firms (consultants, contractors, or suppliers) which together are performing the Contractor&rsquo;s obligations under a turnkey or design and build contract.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>(b) Conflict among consulting assignments: Neither consultants (including their personnel and sub-consultants), nor any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm, shall be hired for any assignment that, by its nature, may be in conflict with another assignment of the consultants. As an example, consultants assisting a client in the privatization of public assets shall neither purchase, nor advise purchasers of, such assets. Similarly, consultants hired to prepare Terms of Reference (TOR) for an assignment shall not be hired for the assignment in question.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>(c) Relationship with Borrower&rsquo;s staff: Consultants (including their experts and other personnel, and sub-consultants) that have a close business or family relationship with a professional staff of the Borrower (or of the project implementing agency, or of a recipient of a part of the loan) who are directly or indirectly involved in any part of: (i) the preparation of the TOR for the assignment, (ii) the selection process for the contract, or (iii) the supervision of such contract may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>(d) A consultant shall submit only one proposal, either individually or as a joint venture partner in another proposal. If a consultant, including a joint venture partner, submits or participates in more than one proposal, all such proposals shall be disqualified. This does not, however, preclude a consulting firm to participate as a sub-consultant, or an individual to participate as a team member, in more than one proposal when circumstances justify and if permitted by the RFP.</p>\r\n\r\n<p>Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications or engage expects.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Interested firms must organize their Expression of Interest in the following order: Chapter 1; i) Company Profile, ii) Legal Status (Certificate of Incorporation), iii) Letter of intent of Association, if necessary, iv) organizational chart, a list of Board of Directors, and beneficial ownership. Chapter 2; i) Experience of at least two (2) assignments each with a scope and nature similar to what is stated above during the last 10 years, ii) A summary of similar assignments undertaken as a lead partner, iii) A summary of assignments undertaken in the project country and in Sub Saharan Africa, giving the client name and the year in which the assignment was carried out, and Chapter 3; i) Experience in donor funded projects. The document must properly be paged, and a table of content provided.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Method of Selection method set out in the Consultant Guidelines.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Further information can be obtained at the address below during office hours 0730 to 16:30 local time</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Expressions of interest must be delivered in a written form (One original and six (6) copies (one electronic as a pdf.file)) to the address below (in person, or by mail) by 08h00 on January 25, 2019 The submissions shall be opened immediately thereafter in the Conference Room of the offices of the Ministry of Transport and Communications as stated below in the presence of firms or their representatives who choose to attend.</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<p>Bidders who once submitted a requested to re=submit their Expression of intetest</p>\r\n\r\n<p>&nbsp;</p>\r\n\r\n<table border=\"0\" cellpadding=\"0\" cellspacing=\"0\" style=\"width:660px\">\r\n\t<tbody>\r\n\t\t<tr>\r\n\t\t\t<td style=\"width:348px\">\r\n\t\t\t<p>Physical:</p>\r\n\r\n\t\t\t<p>The Secretary</p>\r\n\r\n\t\t\t<p>Ministerial Tender Committee</p>\r\n\r\n\t\t\t<p>Ministry of Transport and Communications</p>\r\n\r\n\t\t\t<p>Room Number 18 Unit 22</p>\r\n\r\n\t\t\t<p>Secretariat Office, Ground Floor</p>\r\n\r\n\t\t\t<p>MTC Building, West Gate Mall, Gaborone, Botswana</p>\r\n\r\n\t\t\t<p>Tel: +267 361200</p>\r\n\r\n\t\t\t<p>Fax: +267 3907236</p>\r\n\r\n\t\t\t<p>E-mail: <em>mbaele@gov.bw</em><em> or </em><em>kmmopa@gov.bw</em></p>\r\n\r\n\t\t\t<p>&nbsp;</p>\r\n\t\t\t</td>\r\n\t\t\t<td style=\"width:312px\">\r\n\t\t\t<p>Postal:</p>\r\n\r\n\t\t\t<p>The Secretary</p>\r\n\r\n\t\t\t<p>Ministerial Tender Committee</p>\r\n\r\n\t\t\t<p>Private Bag 00414</p>\r\n\r\n\t\t\t<p>Gaborone, Botswana</p>\r\n\r\n\t\t\t<p>&nbsp;</p>\r\n\t\t\t</td>\r\n\t\t</tr>\r\n\t</tbody>\r\n</table>\r\n\r\n<p>&nbsp;</p>"}]}