{"rows":20,"os":"0","page":"1","total":"786","procnotices":[{"id":"OP00456627","notice_type":"Contract Award","noticedate":"14-Jul-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Bangladesh","project_id":"P176549","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project","bid_reference_no":"BLPA-W4","bid_description":"Development of Bhomra land port -Construction of parking yard, , sheds and warehouses with other ancillary facilities","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-07-14T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P176549-Accelerating Transport and Trade Connectivity in Eastern South Asia  Bangladesh Phase 1 Project<br/><b>Loan/Credit/TF Info:</b>IDA-71660<br/><b>Bid/Contract Reference No:</b>BLPA-W4<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Development of Bhomra Land Port- Construction of Parking Yard, Sheds and Warehouses with other Ancillary Facilities.</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/28<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>24 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DIENCO (758871)</b><br/>Suite-4A, Nakshi Home, 6/1/A Topkhana Road, Segunbagicha, Dhaka, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>TIANEN CONSTRUCTION GROUP CO. LTD. (856171)</b><br/>Hanqi Road, Zongkou Industrial Park, Zongkou Management Area, Qianjiang City, Hubei Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 2301144694.84</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>BDT 2331144694.84</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>DIENCO (758871)</b><br/>Form Date: 02-JUL-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Engr. S.M. Khorshed Alam</td><td>BD</td><td>Bangladesh</td><td>Directly or indirectly holding 25% or more of the shares</td></tr></tbody></table></div></div><br/><div class='col-sm-12'><b>TIANEN CONSTRUCTION GROUP CO. LTD. (856171)</b><br/>Form Date: 02-JUL-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Tang Meirong</td><td>CN</td><td>China</td><td>Directly or indirectly holding 25% or more of the shares</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NATIONAL DEVELOPMENT ENGINEERS LTD. (655005)</b><br/>House No-22, Road - 04, Block - C, Banani, Dhaka-1213<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 2450000000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CONCORD PRAGATEE CONSORTIUM LTD. (992192)</b><br/>5/10, Lalmatia Housing Society, Block-D, Dhaka-1207, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 2812393150.16</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MAX INFRASTRUCTURE LIMITED (558203)</b><br/>Raowa Complex, VIP Road, Mohakhali Level - 11<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 3162656834.94</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CONFIDENCE INFRASTRUCTURE PLC (961386)</b><br/>Monem Business District, East Tower (7th-9th Floor), 111 Bir Uttam C. R. Dutta Road, Dhaka 1205<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 2915778997.03</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SPECTRA ENGINEERS LIMITED (743701)</b><br/>House # 17, Road # 106, Block # CEN(F), Gulshan-2, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 3284694623.41</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA ROAD AND BRIDGE CORP (1024042)</b><br/>Pang Ming ,Room 1008, C88, Andingmenwai Dajie, Dongcheng District,Beijing,<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 2261205608.91</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MM BUILDERS & ENGINEERS LTD (1024069)</b><br/>House 127, (6th floor), Road 10, Block C,Niketon, Gulshan-1, Dhaka 1212<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MOYENUDDIN (BASHI) LIMITED (991839)</b><br/>Holding No.: 7, H.M.M Road, 2nd Floor, Doratana, Jashore<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>ANIK TRADING AND CONSTRUCTION LIMITED (991843)</b><br/>House No.: 21, Main Road, Noboday Housing Society, Mohammadpur, Dhaka- 1207<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MIR AKHTER HOSSAIN LTD. (992186)</b><br/>430/1, Tejgaon Industrial Area, Dhaka-1208, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>CHINA JIANGSU INTERNATIONAL ECONOMIC AND TECHNICAL COOPERATION GROUP LTD (1024029)</b><br/>CJI Office: No. 5, Beijing West Road, Nanjing, Jiangsu Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MONICO LIMITED (575702)</b><br/>Monico Bhaban, 26-27, Ring Road, Adabar, Dhaka-1207<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>RANA BUILDERS (PVT.) LTD. (1017783)</b><br/>55, West Panthapath (Lake Circus Kalabagan), Sheltech Tower (7th Floor), E-Flat, Dhaka-1205, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>GUIZHOU BRIDGE CONSTRUCTION GROUP CO., LTD. (1023950)</b><br/>26F, No.1 Middle Yanan Road, Yunyan District,Guiyang City, Guizhou Province, P.R.CHINA<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA RAILWAY NO. 4 ENGINEERING GROUP CO. LTD. (1017760)</b><br/>No. 96 # Wangjiang East Road, Baohe District, Hefei City, Anhui Province, P.R China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>STANDARD ENGINEERS LTD. (1024067)</b><br/>Mahmudul HasanTaher Tower (11th Floor)Plot: 10, Gulshan-2, Dhaka-1212<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>WESTERN ENGINEERING (PVT.) LTD (553485)</b><br/>TCB Bhaban, 10th floor, 1 Kawran Bazar, Dhaka-1215, Bangladesh<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>S. S. RAHAMAN INTERNATIONAL LTD (1024071)</b><br/>TCB Bhaban (10th Floor), 1 Kawran Bazar, Dhaka-1215<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>POWER CHINA HARBOUR (1024060)</b><br/>Chuangyi Building 8, No.865, Dong Man Central Road, Sino-singapore Eco-city, Binhai New Area, Tianjin, P.R. China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TOMA CONSTRUCTION LTD (991851)</b><br/>Toma Tower, 77/1 Kakrail, VIP Road, Ramna, Dhaka- 1000<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>Hubei Industrial Construction Group Co., Ltd. (590124)</b><br/>Building B16, Software New City, No. 8 Huacheng Avenue, Donghu New Technology Development Zone (2021 Annual Report), Wuhan, CN<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>THE CIVIL ENGINEERS LTD (1023947)</b><br/>House: Civil Engineers Bhaban, 69, Mohakhali C/A, Dhaka-1212,<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>UDC CONSTRUCTION LTD. (967834)</b><br/>NAVANA Yusuf Infinity (Level-10), 16 Mohakhali C/A, Dhaka-1212<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>NEXT SPACES LTD. (967876)</b><br/>40, Shahid Tajuddin Ahmed Sarani, Dhaka-1208<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>SHAMIM ENTERPRISE (PVT) LTD (1024075)</b><br/>4. K.B. Ismail road, Mymensingh, Mymensingh Sadar-2200<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div></div>"},{"id":"OP00455698","notice_type":"Invitation for Bids","noticedate":"08-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-09-18T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Solomon Islands","project_id":"P176548","project_name":"Second Solomon Islands Roads and Aviation Project","bid_reference_no":"SB-PST-553299-CW-RFB","bid_description":"The Fiu River Bridge Replacement","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"Honiara","contact_ctry_name":"Solomon Islands","contact_email":"adanitofea@mca.gov.sb","contact_name":"Alwyn Danitofea","contact_organization":"Project Support Team","contact_phone_no":"+67736107","submission_date":"2026-07-08T00:00:00Z","notice_text":"<p><strong>Specific Procurement Notice</strong></p><p><strong>Request for Bids</strong></p><p><strong>Works</strong></p><p><strong>(Two-envelope Bidding Process Without Prequalification)</strong></p><p><strong>Employer: </strong><em>Ministry of Infrastructure Development (MID), Solomon Islands Government (SIG)</em></p><p><strong>Project:<em> </em></strong><em>Second Solomon Islands Roads and Aviation Project (SIRAP2) </em></p><p><strong>Contract title: </strong><em>Fiu River Bridge Replacement</em><strong> </strong></p><p><strong>Country: </strong><em>Solomon Islands</em></p><p><strong>Loan No. /Credit No. / Grant No.:</strong><em> [</em><em>to be determined]</em></p><p><strong>RFB No: </strong><em>SB-PST-553299-CW-RFB</em><strong> </strong></p><p><strong>Issued on: </strong><em>July 2026</em></p><ol><li>The <strong>Solomon Islands Government (SIG)</strong> is seeking<em> </em>financing from the World Bank toward the cost of the proposed <strong>Second Solomon Islands Roads and Aviation Project (SIRAP2) Second Additional Financing (AF#2)</strong> and intends to apply part of the proceeds toward payments under the contract for the <strong>Fiu River Bridge Replacement</strong>.</li><li>The MID now invites sealed Bids from eligible Bidders for the <em>Fiu River Bridge Replacement Works in Malaita Province, include the construction of a new climate-resilient Fiu River Bridge; upgrading of associated approach roads; bridge substructure and superstructure works; drainage, scour protection, embankment and pavement works; and associated road safety and climate resilience improvements as well as the demolition of the existing steel truss bridge, piers, and foundations</em>.<em> </em></li><li>Bidding will be conducted through international competitive procurement using Request for Bids (RFB) as specified in the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers- Procurement in Investment Projects Financing&rdquo; September 2025 (&ldquo;Procurement Regulations&rdquo;) and is open to all eligible Bidders as defined in the Procurement Regulations.</li><li>Bids will be evaluated in accordance with the evaluation process set out in the bidding documents. The following weightings shall apply for Rated Criteria (including technical and non-price factors): <em>60 % </em>and for Bid cost: <em>40%. </em></li><li>Interested eligible Bidders may obtain further information from <em>rkonale@sirap.sb</em><em> and </em><em>tatyana@paiptfsu.com</em><em> .</em></li><li>The RFB document in English will be emailed to interested eligible Bidders upon the submission of a written application to the email address below.</li><li>Bids must be emailed to the address below on or before <strong><em>10:00am on</em></strong><em> <strong>18 September 2026</strong>, Solomon Islands time.</em> Electronic bidding will be permitted. Late Bids will be rejected. The TECHNICAL PART will be publicly opened in the presence of the Bidders&rsquo; designated representatives and anyone who chooses to attend, at the address below via Google Meet: <em>https://meet.google.com/imy-wypc-xdq</em><em> at <strong>11am on 18 September 2026</strong>, Solomon Islands time</em>. All FINANCIAL PARTs shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening.</li><li>All Bids must be accompanied by a: (i) <em>Bid-Securing Declaration</em>; and (ii) Local Labour Method Statement.</li><li>Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder&rsquo;s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document</li><li>The address referred to above is:</li></ol><p><strong>SIRAP2 Project Support Team Office</strong></p><p><em>ACE Complex, 1st Floor, Kukum Highway, Honiara, Solomon Islands</em></p><p><strong><em>Telephone</em></strong><em>: (+677) 30275 </em></p><p><strong><em>Email</em></strong><em>: </em><em>rkonale@sirap.sb</em>&nbsp;and<em> tatyana@paiptfsu.com</em></p><p><strong><em>Website</em></strong><em>: </em><em>http://sirap.sb</em></p>"},{"id":"OP00454413","notice_type":"Contract Award","noticedate":"29-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Bangladesh","project_id":"P176549","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project","bid_reference_no":"WP-1 (LOT-1, LOT-2 & LOT-3)","bid_description":"Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway from Sylhet (Kadamtali) - Golapganj - Sheola Bridge - Sheola Landport (Ch. 00+000 to 42+985 km) (Length: 42.985 km)","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-06-29T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P176549-Accelerating Transport and Trade Connectivity in Eastern South Asia  Bangladesh Phase 1 Project<br/><b>Loan/Credit/TF Info:</b>IDA-71660<br/><b>Bid/Contract Reference No:</b>WP-1 (LOT-1, LOT-2 & LOT-3)<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Lot-3: Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway from Sheola Bridge to Sheola Landport (Ch. 36+900 to 42+985 km) (Length: 6.085 km).</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/22<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>11 Year(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NATIONAL DEVELOPMENT ENGINEERS LTD. (655005)</b><br/>House No-22, Road - 04, Block - C, Banani, Dhaka-1213<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>XINGTAI ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD (836551)</b><br/>No. 239 South Jianye Street, Xiangtai City, P.R China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 4371299999.99</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>BDT 5899999999.02</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>NATIONAL DEVELOPMENT ENGINEERS LTD. (655005)</b><br/>Form Date: 25-JUN-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Raihan Mustafiz</td><td>BD</td><td>Bangladesh</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Numa Salsabila</td><td>BD</td><td>Bangladesh</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr></tbody></table></div></div><br/><div class='col-sm-12'><b>XINGTAI ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD (836551)</b><br/>Form Date: 25-JUN-26<br/><br/><br/><br/><b>Summary of Reason</b><br/>XINGTAI ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD is a state owned company. No Natural person holds any shares or voting rights of the enterprise.</div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA FIRST METALLURGICAL GROUP CO., LTD. (187173)</b><br/>No. 3, Gongye Avenue, Qingshan, Wuhan, Hubei Province, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8332965962.21</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DIENCO (758871)</b><br/>Suite-4A, Nakshi Home, 6/1/A Topkhana Road, Segunbagicha, Dhaka, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>TIANEN CONSTRUCTION GROUP CO. LTD. (856171)</b><br/>Hanqi Road, Zongkou Industrial Park, Zongkou Management Area, Qianjiang City, Hubei Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5347174554.26</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MONICO LIMITED (575702)</b><br/>Monico Bhaban, 26-27, Ring Road, Adabar, Dhaka-1207<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 4878000112.05</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION CORPORATION LIMITED (1017765)</b><br/>No. 267, 15th Avenue, Economic Development Zone, Zhengzhou City, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5708810433.12</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>China Road And Bridge Corporation (419591)</b><br/>1008, C 88, Andingmen Outer St., Dongcheng District, Beijing, CN, 100011<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 4902288341.18</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MAX INFRASTRUCTURE LIMITED (558203)</b><br/>Raowa Complex, VIP Road, Mohakhali Level - 11<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5135574042.10</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>M/S. MD. JAMIL IQBAL (588341)</b><br/>28, Brammonpara, Burhanbag, Shibgonj, Sylhet-3100, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>LONGJIAN ROAD & BRIDGE CO., LTD. (1017741)</b><br/>No. 368, Changjiang Road, Nangang District, Harbin, Heilongjiang, P. R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5437093251.15</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>OHIDUZZAMAN CHOWDHURY (70713)</b><br/>57 Shadipur R/A, Shibgonj, Sylhet, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>M/S JANMABUMI NIRMATA (408969)</b><br/>House # 76, Road # 3, Block-E, Shahjalal Upashahar, Sylhet, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>SHAANXI CONSTRUCTION ENGINEERING GROUP CORPORATION LIMITED (544959)</b><br/>1607B, Floor 16th, Tower B, DU Shi Zhi Men, No. 1, Jinye Road, Xian High-yech Zone, Shaanxi Province, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 4740161914.57</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>HANIL ENGINEERING & CONSTRUCTION CO. LTD. (364202)</b><br/>2708 Nambusunhwan-ro, Gangnam-gu, Seoul, Republic of Korea.<br/>Country: Korea, Republic of<br/></br></div><div class='row col-sm-12'><b>CONCORD PRAGATEE CONSORTIUM LTD. (992192)</b><br/>5/10, Lalmatia Housing Society, Block-D, Dhaka-1207, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5941259809.25</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>QINGDAO TRAFFIC CONSTRUCTION GROUP CO. LTD. (QTCG) (745675)</b><br/>11F, Block-A, Heda Center, No. 177 Tailiu Road, Shibei District, Qingdao, Shangdong, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>PROPERTY DEVELOPMENT LIMITED (852219)</b><br/>Ga-105/1, Middle Badda, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5789802900.47</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SPECTRA ENGINEERS LIMITED (743701)</b><br/>House # 17, Road # 106, Block # CEN(F), Gulshan-2, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 5170346019.11</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MIR AKHTER HOSSAIN LTD. (992186)</b><br/>430/1, Tejgaon Industrial Area, Dhaka-1208, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>GUIZHOU BRIDGE CONSTRUCTION GROUP CO., LTD. (1023950)</b><br/>26F, No.1 Middle Yanan Road, Yunyan District,Guiyang City, Guizhou Province, P.R.CHINA<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA RAILWAY BEIJING ENGINEERING GROUP CO., LTD. (1017782)</b><br/>No. 161, Yudai East Second Street, Mentougou District, Beijing, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>RANA BUILDERS (PVT.) LTD. (1017783)</b><br/>55, West Panthapath (Lake Circus Kalabagan), Sheltech Tower (7th Floor), E-Flat, Dhaka-1205, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TOMA CONSTRUCTION LTD (991851)</b><br/>Toma Tower, 77/1 Kakrail, VIP Road, Ramna, Dhaka- 1000<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div></div>"},{"id":"OP00454386","notice_type":"Contract Award","noticedate":"29-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Bangladesh","project_id":"P176549","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project","bid_reference_no":"WP-1 (LOT-1, LOT-2 & LOT-3)","bid_description":"Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway from Sylhet (Kadamtali) - Golapganj - Sheola Bridge - Sheola Landport (Ch. 00+000 to 42+985 km) (Length: 42.985 km)","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-06-29T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P176549-Accelerating Transport and Trade Connectivity in Eastern South Asia  Bangladesh Phase 1 Project<br/><b>Loan/Credit/TF Info:</b>IDA-71660<br/><b>Bid/Contract Reference No:</b>WP-1 (LOT-1, LOT-2 & LOT-3)<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Lot-2: Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway from Golapganj to Sheola Bridge (Ch. 18+900 to 36+900 km) (Length: 18.00 km).</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/22<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>11 Year(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>China Road And Bridge Corporation (419591)</b><br/>1008, C 88, Andingmen Outer St., Dongcheng District, Beijing, CN, 100011<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 6317551830.58</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>BDT 8165551830.58</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>China Road And Bridge Corporation (419591)</b><br/>Form Date: 23-JUN-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>China Communications Construction Company Limited</td><td>CN</td><td>China</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent, Directly or indirectly holding 25 % or more of the Voting Rights</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NATIONAL DEVELOPMENT ENGINEERS LTD. (655005)</b><br/>House No-22, Road - 04, Block - C, Banani, Dhaka-1213<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>XINGTAI ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD (836551)</b><br/>No. 239 South Jianye Street, Xiangtai City, P.R China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7052000004.70</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CONCORD PRAGATEE CONSORTIUM LTD. (992192)</b><br/>5/10, Lalmatia Housing Society, Block-D, Dhaka-1207, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 9005227011.08</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MONICO LIMITED (575702)</b><br/>Monico Bhaban, 26-27, Ring Road, Adabar, Dhaka-1207<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>HOSSAIN CONSTRUCTION (PVT.) LTD. (1017762)</b><br/>HCPL Tower, Commercial Plot No. 16, Main Road-1, Section-10, Senpara, Parbata, Mirpur, Dhaka-1216, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 6519453794.59</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MAX INFRASTRUCTURE LIMITED (558203)</b><br/>Raowa Complex, VIP Road, Mohakhali Level - 11<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>ZHENGHOU CITY HIGHWAY ENGINEERING CORPORATION (1017785)</b><br/>No. 1, Building 12, No. 1, Cuizhu Street, Zhenghou Hi-Tech Industrial Development Zone, Zhenghou City, Henan Province, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8687363755.93</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>M/S. MD. JAMIL IQBAL (588341)</b><br/>28, Brammonpara, Burhanbag, Shibgonj, Sylhet-3100, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>LONGJIAN ROAD & BRIDGE CO., LTD. (1017741)</b><br/>No. 368, Changjiang Road, Nangang District, Harbin, Heilongjiang, P. R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7095975746.20</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>HENAN HIGHWAY ENGINEERING GROUP CO., LTD. (745620)</b><br/>No. 91, Zhongyuan Road, Zhengzhou City, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>MIR AKHTER HOSSAIN LTD. (992186)</b><br/>430/1, Tejgaon Industrial Area, Dhaka-1208, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7785744093.84</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SPECTRA ENGINEERS LIMITED (743701)</b><br/>House # 17, Road # 106, Block # CEN(F), Gulshan-2, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7367108438.01</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>QINGDAO TRAFFIC CONSTRUCTION GROUP CO. LTD. (QTCG) (745675)</b><br/>11F, Block-A, Heda Center, No. 177 Tailiu Road, Shibei District, Qingdao, Shangdong, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>MUHAMMAD AMINUL HAQUE (PVT.) LTD. (1006938)</b><br/>59/D/B, Flat# 14/B-3, Darussalam Tower-2, Kallyanpur, Dhaka-1216, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 6754760619.18</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA FIRST METALLURGICAL GROUP CO., LTD. (187173)</b><br/>No. 3, Gongye Avenue, Qingshan, Wuhan, Hubei Province, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 11117529739.89</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>STECOL CORPORATION (928085)</b><br/>No 2, Haitai Fazhan 5th Rd, Huayuan Industrial Zone (outer Ring), Binhai High-tech Area, Tianjin City<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7049649275.63</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SICHUAN ROAD & BRIDGE (GROUP) CORPORATION LTD. (333380)</b><br/>No. 12, Jiuxing Avenue, High-tech Zone<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 9076902953.17</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION CORPORATION LIMITED (1017765)</b><br/>No. 267, 15th Avenue, Economic Development Zone, Zhengzhou City, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8872663972.98</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>PROPERTY DEVELOPMENT LIMITED (852219)</b><br/>Ga-105/1, Middle Badda, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>CHINA SHANDONG INTERNATIONAL ECONOMIC & TECHNICAL COOPERATION GROUP LTD. (1006972)</b><br/>No. 8, Long ao North Road, Lixia District, Jinan City, Shandong Province, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>SHANDONG ROAD & BRIDGE CONSTRUCTION GROUP CO., LTD. (1017755)</b><br/>Room 1815, No. 14677, Jingshi Road, Lixia District, Jinan City, Shandong Province, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 7943002450.14</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA RAILWAY FIRST GROUP CO., LTD. (CRFG) (991897)</b><br/>No. 1 Yantabeilu Rd., Beilia District, Xian City, Shaanxi Province, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8716032086.45</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA JIANGXI INTERNATIONAL ECONOMIC AND TECHNICAL COOPERATION CO., LTD. (446846)</b><br/>No. 1198, Fenghezhong Avenue, Honggutan District, Nanchang, Jiangxi, P. R. China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>ZHEJIANG INFRASTRUCTURE CONSTRUCTION GROUP CO., LTD. (675944)</b><br/>ShengJianGong Building, No. 20 Wensan Road, Hangzhou, Zhejiang, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>RANA BUILDERS (PVT.) LTD. (1017783)</b><br/>55, West Panthapath (Lake Circus Kalabagan), Sheltech Tower (7th Floor), E-Flat, Dhaka-1205, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>GUIZHOU BRIDGE CONSTRUCTION GROUP CO., LTD. (1023950)</b><br/>26F, No.1 Middle Yanan Road, Yunyan District,Guiyang City, Guizhou Province, P.R.CHINA<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non-compliance<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>OHIDUZZAMAN CHOWDHURY (70713)</b><br/>57 Shadipur R/A, Shibgonj, Sylhet, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>M/S JANMABUMI NIRMATA (408969)</b><br/>House # 76, Road # 3, Block-E, Shahjalal Upashahar, Sylhet, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>SHAANXI CONSTRUCTION ENGINEERING GROUP CORPORATION LIMITED (544959)</b><br/>1607B, Floor 16th, Tower B, DU Shi Zhi Men, No. 1, Jinye Road, Xian High-yech Zone, Shaanxi Province, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TOMA CONSTRUCTION LTD (991851)</b><br/>Toma Tower, 77/1 Kakrail, VIP Road, Ramna, Dhaka- 1000<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>HUBEI PROVINCIAL ROAD & BRIDGE GROUP CO., LTD. (1017793)</b><br/>No. 36 Dongfeng Avenue, Economic & Technology Development Zone of Wuhan City, Hubei Province, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div></div>"},{"id":"OP00454383","notice_type":"Contract Award","noticedate":"29-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Bangladesh","project_id":"P176549","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project","bid_reference_no":"WP-1 (LOT-1, LOT-2 & LOT-3)","bid_description":"Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway from Sylhet (Kadamtali) - Golapganj - Sheola Bridge - Sheola Landport (Ch. 00+000 to 42+985 km) (Length: 42.985 km)","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-06-29T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P176549-Accelerating Transport and Trade Connectivity in Eastern South Asia  Bangladesh Phase 1 Project<br/><b>Loan/Credit/TF Info:</b>IDA-71660<br/><b>Bid/Contract Reference No:</b>WP-1 (LOT-1, LOT-2 & LOT-3)<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Lot-1: Improvement of Sylhet-Charkhai-Sheola Highway into 4-Lane Highway with Service Lanes on Both Sides from Sylhet (Kadamtali) to Golapganj (Ch. 00+000 to 18+900 km) (Length: 18.90 km).</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/22<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>11 Year(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MONICO LIMITED (575702)</b><br/>Monico Bhaban, 26-27, Ring Road, Adabar, Dhaka-1207<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>CHINA RAILWAY NO. 4 ENGINEERING GROUP CO. LTD. (1017760)</b><br/>No. 96 # Wangjiang East Road, Baohe District, Hefei City, Anhui Province, P.R China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8171004834.77</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>BDT 10995184426.30</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>MONICO LIMITED (575702)</b><br/>Form Date: 28-JUN-26<br/><br/><br/><br/><b>Summary of Reason</b><br/>the bidder has provided the BO form (which is attached herewith) where there is NO Beneficial Owners meets the conditions</div><br/><div class='col-sm-12'><b>CHINA RAILWAY NO. 4 ENGINEERING GROUP CO. LTD. (1017760)</b><br/>Form Date: 28-JUN-26<br/><br/><br/><br/><b>Summary of Reason</b><br/>the bidder has provided the BO form (which is attached herewith) where there is NO Beneficial Owners meets the conditions</div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NATIONAL DEVELOPMENT ENGINEERS LTD. (655005)</b><br/>House No-22, Road - 04, Block - C, Banani, Dhaka-1213<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>XINGTAI ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD (836551)</b><br/>No. 239 South Jianye Street, Xiangtai City, P.R China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8075399999.99</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SICHUAN ROAD & BRIDGE (GROUP) CORPORATION LTD. (333380)</b><br/>No. 12, Jiuxing Avenue, High-tech Zone<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 11005633182.24</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>UCCL THE UNITED CONSTRUCTION COMPANY LIMITED (830997)</b><br/>House# 116 (10th Floor), Road# 11, Block-E, Banani, Dhaka-1213, Bangladesh.<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>GUIZHOU HIGHWAY ENGINEERING GROUP CO., LTD (991846)</b><br/>Guizhou Highway Engineering Group Building, No. 8, Jiaxiu North Road, Yunyan District, Guiyang City, Guizhou Province, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>CHINA NATIONAL MACHINERY IMPORT & EXPORT CORPORATION (991847)</b><br/>No. 1, Fuchengmenwai Avenue, Xicheng District, Beijing, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8576325192.60</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>China Road And Bridge Corporation (419591)</b><br/>1008, C 88, Andingmen Outer St., Dongcheng District, Beijing, CN, 100011<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8606778309.66</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MAX INFRASTRUCTURE LIMITED (558203)</b><br/>Raowa Complex, VIP Road, Mohakhali Level - 11<br/>Country: Bangladesh<br/></br></div><div class='row col-sm-12'><b>ZHENGHOU CITY HIGHWAY ENGINEERING CORPORATION (1017785)</b><br/>No. 1, Building 12, No. 1, Cuizhu Street, Zhenghou Hi-Tech Industrial Development Zone, Zhenghou City, Henan Province, P.R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 9807141074.82</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>LONGJIAN ROAD & BRIDGE CO., LTD. (1017741)</b><br/>No. 368, Changjiang Road, Nangang District, Harbin, Heilongjiang, P. R. China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 11587836432.79</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>HANIL ENGINEERING & CONSTRUCTION CO. LTD. (364202)</b><br/>2708 Nambusunhwan-ro, Gangnam-gu, Seoul, Republic of Korea.<br/>Country: Korea, Republic of<br/></br></div><div class='row col-sm-12'><b>CONCORD PRAGATEE CONSORTIUM LTD. (992192)</b><br/>5/10, Lalmatia Housing Society, Block-D, Dhaka-1207, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 10207878615.27</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SINOHYDRO CORPORATION LIMITED (411310)</b><br/>Building 23, No.17, Xicui Road, Haidian District, Beijing, P.R. China Malawi Office P.O. Box 1256, Plot 445, Area 12, Lilongwe Tel. : +265 993412974 Email: dua<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>SINOHYDRO ENGINEERING BUREAU 8 CORPORATION LIMITED (SEBCL) (745649)</b><br/>No. 8 Changqing Road, Tianxin District, Changsha City, Hunan Province, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 8908499694.24</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>HENAN HIGHWAY ENGINEERING GROUP CO., LTD. (745620)</b><br/>No. 91, Zhongyuan Road, Zhengzhou City, China.<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>MIR AKHTER HOSSAIN LTD. (992186)</b><br/>430/1, Tejgaon Industrial Area, Dhaka-1208, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 10352430265.31</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SPECTRA ENGINEERS LIMITED (743701)</b><br/>House # 17, Road # 106, Block # CEN(F), Gulshan-2, Dhaka-1212, Bangladesh.<br/>Country: Bangladesh<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT 9451078829.37</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>Shandong Hi-Speed Road & Bridge Group Co., Ltd. (836574)</b><br/>No.14677, Jingshi Road, Lixia District, Jinan, CN, 250014<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>JINAN URBAN CONSTRUCTION GROUP CO., LTD (872978)</b><br/>No. 29, East Automobile Road, Jiluo Road, Tianqiao District, Jinan City, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>BDT<br/><br/>Evaluated Bid Price<br/>BDT<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div></div>"},{"id":"OP00450447","notice_type":"Contract Award","noticedate":"11-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Lao People's Democratic Republic","project_id":"P172774","project_name":"Lao PDR Priority Skills for Growth","bid_reference_no":"C2.1-CW-7","bid_description":"Refurbishment of JC Phongsaly","procurement_group":"CW","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","submission_date":"2026-06-11T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P172774-Lao PDR Priority Skills for Growth<br/><b>Loan/Credit/TF Info:</b>IDA-70420<br/><b>Bid/Contract Reference No:</b>C2.1-CW-7<br/><b>Procurement Method:</b>RFQ-Request for Quotations<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Refurbishment of Phongsaly JC</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/08<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>6 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>BARNAZAR HEAVY EQUIPMENT AND CONSTRUCTION CO., LTD (1096657)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 1260157130.3<br/><br/>Evaluated Bid Price<br/>LAK 1260157130.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>LAK 1260157170.00</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>KT THAVISUP CO.,LTD (1019693)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 113861.01<br/><br/>Evaluated Bid Price<br/>LAK 113861.01</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>PHONEMALI CONSTRUCTION COMPLEX SOLE CO., LTD (1096653)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 97883.12<br/><br/>Evaluated Bid Price<br/>LAK 97883.12</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>THANASUP SOLE CO., LTD (1096651)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 143371.95<br/><br/>Evaluated Bid Price<br/>LAK 143371.95<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SENGKEO BRIDGE AND ROAD CONSTRUCTION SOLE CO., LTD (1096652)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 1252361776.00<br/><br/>Evaluated Bid Price<br/>LAK 1252361776.00<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>S C DESIGN CONSTRUCTION (1096656)</b><br/>Vientiane, Lao PDR<br/>Country: Lao People's Democratic Republic<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>LAK 1465524779.00<br/><br/>Evaluated Bid Price<br/>LAK<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div></div>"},{"id":"OP00450406","notice_type":"Contract Award","noticedate":"10-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nigeria","project_id":"P170664","project_name":"Adolescent Girls Initiative for Learning and Empowerment","bid_reference_no":"NG-KANO STATE-440223-GO-RFB","bid_description":"Procurement of:\nA. 2,500 desktop computers, \nB. 100 no. 10KVA batteryless inverters\nC. 300 UPS units, \nD. 100 No. 4000-Lumen SVGA projectors, ceiling-mounted & screens\nE. Purchase of Indoor Routers (IDRs) & annual subscription to the internet for 1 year.","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-06-10T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P170664-Adolescent Girls Initiative for Learning and Empowerment<br/><b>Loan/Credit/TF Info:</b>IDA-67380<br/><b>Bid/Contract Reference No:</b>NG-KANO STATE-440223-GO-RFB<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Procurement and Installation of 2,500 Desktop Computers for 100 Digital Literacy Schools in Kano State. Lot 1.</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/05/18<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>90 Day(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>JAMBAL GLOBAL INVESTMENT (1049671)</b><br/>Nassarawa GRA, Kano, Kano State<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 2500000000.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NGN 2500000000</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>RESOLVE AND STRATEGO LIMITED (1063828)</b><br/>Suite C20, Intercontinental plaza Wuse Zone 3, Abuja.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 2525000000.00</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SYSTEMTECH SERVICES LIMITED (338190)</b><br/>6 MBALA STREET OFF HERBERT MACAULAY WAY ZONE 4 WUSE, ABUJA<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TOTAL IT SOLUTION AND E-LIBRARY (1063875)</b><br/>9, Samberio Crescent, Off Limpopo Street, Maitama, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TASK SYSTEMS LIMITED (793863)</b><br/>No 5 Redemption Crescent Industrial Layout Gbagada Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TRIPLE S CONSTRUCTION ENGINEERING AND CONSULTANCY LTD (1049677)</b><br/>Zaria Road, Kano, Kano State,<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CEDAHOR TECHNOLOGY LTD (813865)</b><br/>92, Awolowo Way, Ikeja, Lagos, Nigeria.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>INFORTECH BRIDGE LIMITED (1063604)</b><br/>Hall A & B poly plaza, Behind AP plaza, Ademola Adetokumbo Crescent Wuse II, Abuja.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DLD TECH SOLUTIONS LIMITED (1063868)</b><br/>Suite 24B Zone 3 Shoing Complex, Wuse, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>OGOLUWA MULTIMEDIA (1063889)</b><br/>30 A, Ilupeju bypass, Ilupeju, Lagos.<br/>Country: Nigeria<br/></br></div><div class='row col-sm-12'><b>FURTHERANCE SUPPORT LIMITED  (1063902)</b><br/>7, Tade Aranmatola Close, Surulere, Lagos.<br/>Country: Nigeria<br/></br></div><div class='row col-sm-12'><b>SIXTUS ENGINEERING SERVICES. (1063904)</b><br/>No. 7 Association Avenue, Ilueju, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>IMPERIAL EDUCATION TECHNOLOGY LIMITED (905502)</b><br/>No. 32, Alh. Kofoworola Crescent, Off Awolowo Way, Ikeja, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>KIMBA ENTERPRISE AND GENERAL CONSTRUCTORS LIMITED (1063860)</b><br/>No. 12/13, Sky Memorial Complex, Zoo Road, Kano.<br/>Country: Nigeria<br/></br></div><div class='row col-sm-12'><b>TECHWARE PROFESSIONAL SERVICES LIMITED (1063873)</b><br/>25, Okeh Street, Dakwa, Tafa, Niger State.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MILLENNIUM TECHNICAL NIGERIA LIMITED (924130)</b><br/>Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div></div>"},{"id":"OP00450083","notice_type":"Contract Award","noticedate":"09-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nepal","project_id":"P170409","project_name":"Nepal Strategic Road Connectivity and Trade Improvement Project","bid_reference_no":"SRCTIP-DOR-W (D&B)- KDP -ICB-05","bid_description":"Construction of Kamala Bridge (Design and Build) at Km 237+022) along Kamala-Dhalkebar- Bagmati Section of Mahendra Highway","procurement_group":"CW","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","submission_date":"2026-06-09T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P170409-Nepal Strategic Road Connectivity and Trade Improvement Project<br/><b>Loan/Credit/TF Info:</b>IDA-66730<br/><b>Bid/Contract Reference No:</b>SRCTIP-DOR-W (D&B)- KDP -ICB-05<br/><b>Procurement Method:</b>RFP-Request for Proposals<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Construction of Kamala Bridge and Approach Roads (Design and Build) From Ch. Km. 236+500 To 238+030 Along Kamala-Dhalkebar-Bagmati Section of Mahendra Highway</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/09<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>1,095 Day(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>EKK INFRASTRUCTURE LIMITED (868665)</b><br/>2nd Floor-Municipal Building AM Road, Perumbavoor, Ernakulam District, Kerala-683 542, India<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 866712900.43</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NPR 1027369477.49</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>EKK INFRASTRUCTURE LIMITED (868665)</b><br/>Form Date: 04-JUN-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>EKK Muhammed</td><td>IN</td><td>India</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Sanju Muhammed</td><td>IN</td><td>India</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DILIP BUILDCON LTD (333485)</b><br/>Corporate Office, Plot No 5, Inside Govind Narayan Singh Gate, Chunabhatti, Kolar Road, Bhopal - 462016<br/>Country: India<br/></br></div><div class='row col-sm-12'><b>RAIL VIKAS NIGAM LIMITED (1043037)</b><br/>August Kranti Bhawan, Bhikhaji Cama Place, R. K. Puram, New Delhi  110 066, India<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1611113326.22</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ELITE CONSTRUCTION COMPANY PVT. LTD., (943419)</b><br/>Sukedhara-04<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>BEIJING KELI HAOJING TECHNOLOGY DEVELOPMENT CO., LTD. (1043080)</b><br/>No. 306, 3rd Floor, South Commercial Building, Jimen Li Community, Haidian District, Beijing, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 942840000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>GAMMON ENGINEERS AND CONTRACTORS PRIVATE LIMITED (1042995)</b><br/>Gammon House, Veer Savarkar Marg, Prabhadevi, Mumbai - 400025, India<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1387100000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ANK CONSTRUCTION CO PVT. LTD. (847528)</b><br/>PO Box 5813 Rabibhawan Kathmandu, Nepal<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>RASUWA CONSTRUCTION COMPANY PVT. LTD. (1043068)</b><br/>Maharajgunj-03, Kathmandu, Nepal<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>SHARMA & COMPANY PVT. LTD. (1043070)</b><br/>RK Complex, Sitapaila, Kathmandu, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1129800000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SHANDONG HI-SPEED ENGINEERING CONSTRUCTION GROUP CO., LTD. (1043023)</b><br/>20-21F, No. 14677, Jingshi Road, Lixia District, Jinan City, Shandong Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 2081224197.59</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>POLY CHANGDA ENGINEERING CO., LTD. (1043020)</b><br/>No. 942, Middle of Guangzhou Avenue, Tianhe District, Guangzhou City, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1297406201.00</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>AKELIK GROUP LLC (928132)</b><br/>26 Ahmad Rajabli - 2 Street, Narimanov district, AZ1075, Baku city the Republic of Azerbaijan<br/>Country: Azerbaijan<br/></br></div><div class='row col-sm-12'><b>HIMDUNG & THOKAR CONSTRUCTION PVT. LTD (1015425)</b><br/>Thamel - 29, Kathmandu, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ZHONGDING INTERNATIONAL ENGINEERING CO.,LTD. (524336)</b><br/>No. 18 Gaoxin 2nd Road, Gaoxin Development District, Nanchang City, Jiangxi Province<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>KUMAR SHRESTHA NIRMAN SEWA PVT. LTD (566290)</b><br/>Chandol, Kathmandu, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA FIRST HIGHWAY ENGINEERING COMPANY LTD (1055999)</b><br/>Zhoujianjing, Guanzhuang, Chaoyang District, Beijing, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SINOHYDRO CORPORATION ENGINEERING BUREAU 15 CO., LTD. (1043016)</b><br/>No. 6 Fengdong Second Road, Fengdong New City, Xian City, Shaanxi Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ALTIS - HOLDING CORPORATION (1043089)</b><br/>03146 City of Kyiv, Kachalova Street, Building 5V, Ukraine<br/>Country: Ukraine<br/></br></div><div class='row col-sm-12'><b>LUMBINI BUILDERS PVT. LTD. (1043115)</b><br/>Siddharthanagar Municipality ward no. 9, Bhairahawa, Rupandehi, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Non Responsive<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TUNDI CONSTRUCTION PVT. LTD. (624811)</b><br/>Shantibasti, Sanepa-3, Lalitpur<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>JIANGXI PACIFIC YUHONG CONSTRUCTION CO., LTD. (1043064)</b><br/>No. 258, Outside South Gate, Qingan County , Yichun City, Jiangxi Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div></div>"},{"id":"OP00449612","notice_type":"Contract Award","noticedate":"08-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nepal","project_id":"P170409","project_name":"Nepal Strategic Road Connectivity and Trade Improvement Project","bid_reference_no":"SRCTIP-DOR-W (D&B)- KDP-ICB-06","bid_description":"Construction of Bagmati Bridge (Design and Build) at Km 313+127) along Kamala-Dhalkebar- Bagmati Section of Mahendra Highway","procurement_group":"CW","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","submission_date":"2026-06-08T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P170409-Nepal Strategic Road Connectivity and Trade Improvement Project<br/><b>Loan/Credit/TF Info:</b>IDA-66730<br/><b>Bid/Contract Reference No:</b>SRCTIP-DOR-W (D&B)- KDP-ICB-06<br/><b>Procurement Method:</b>RFP-Request for Proposals<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Construction of Bagmati Bridge and Approach Roads (Design and Build) From Ch. Km 312+785 To 313+450 Along Kamala-Dhalkebar-Bagmati Section of Mahendra Highway</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/05/14<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>1,095 Day(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SPS CONSTRUCTION INDIA PVT. LTD. (1043300)</b><br/>1006-1007 (10TH FLOOR) NETAJI SUBHASH PLACE, PITAMPURA, NEW DELHI - 110 034, India<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1582560000.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NPR 1866191800.00</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>SPS CONSTRUCTION INDIA PVT. LTD. (1043300)</b><br/>Form Date: 08-MAY-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Sat Paul Singla</td><td>IN</td><td>India</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Deepak Singla</td><td>IN</td><td>India</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Rohit Singla</td><td>IN</td><td>India</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>Shandong Luqiao Group Co.,Ltd. (659554)</b><br/>No.14677, Jingshi Road, Lixia District, Jinan, CN, 250014<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 3300593537.97</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DILIP BUILDCON LTD (333485)</b><br/>Corporate Office, Plot No 5, Inside Govind Narayan Singh Gate, Chunabhatti, Kolar Road, Bhopal - 462016<br/>Country: India<br/></br></div><div class='row col-sm-12'><b>RAIL VIKAS NIGAM LIMITED (1043037)</b><br/>August Kranti Bhawan, Bhikhaji Cama Place, R. K. Puram, New Delhi  110 066, India<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 2067675291.77</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SHAANXI WATER RESOURCES & HYDROPOWER ENGINEERING GROUP CO.LTD (847526)</b><br/>No. 202, Middle Section of Wenjing Road, Xian Economic and Technological Development Zone, China<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>ANK CONSTRUCTION CO PVT. LTD. (847528)</b><br/>PO Box 5813 Rabibhawan Kathmandu, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1619500000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>POLY CHANGDA ENGINEERING CO., LTD. (1043020)</b><br/>No. 942, Middle of Guangzhou Avenue, Tianhe District, Guangzhou City, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR 1843856220.00</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ELITE CONSTRUCTION COMPANY PVT. LTD., (943419)</b><br/>Sukedhara-04<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>BEIJING KELI HAOJING TECHNOLOGY DEVELOPMENT CO., LTD. (1043080)</b><br/>No. 306, 3rd Floor, South Commercial Building, Jimen Li Community, Haidian District, Beijing, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ZHONGDING INTERNATIONAL ENGINEERING CO.,LTD. (524336)</b><br/>No. 18 Gaoxin 2nd Road, Gaoxin Development District, Nanchang City, Jiangxi Province<br/>Country: China<br/></br></div><div class='row col-sm-12'><b>SHARMA & COMPANY PVT. LTD. (1043070)</b><br/>RK Complex, Sitapaila, Kathmandu, Nepal<br/>Country: Nepal<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CHINA FIRST HIGHWAY ENGINEERING COMPANY LTD (1055999)</b><br/>Zhoujianjing, Guanzhuang, Chaoyang District, Beijing, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>VISHWA BHARATI ENGINEERS PVT. LTD. (1043341)</b><br/>Flat No. 204, Shivam Block, Ramaraju Nagar, Jeedimitla, Secunderabad - 500 055,TG., lndia<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>TUNDI CONSTRUCTION PVT. LTD. (624811)</b><br/>Shantibasti, Sanepa-3, Lalitpur<br/>Country: Nepal<br/></br></div><div class='row col-sm-12'><b>JIANGXI PACIFIC YUHONG CONSTRUCTION CO., LTD. (1043064)</b><br/>No. 258, Outside South Gate, Qingan County , Yichun City, Jiangxi Province, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>NPR<br/><br/>Evaluated Bid Price<br/>NPR<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div></div>"},{"id":"OP00448807","notice_type":"Request for Expression of Interest","noticedate":"03-Jun-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-06-18T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Lebanon","project_id":"P181954","project_name":"GFPP for Lebanon Digital Acceleration Project","bid_reference_no":"LB-OMSAR-537755-CS-CQS","bid_description":"E-signature Foundations:  Roadmap/plan for implementation + Capacity Building","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"OMSAR, STARCO Building, Bloc A, 5th Floor\nOmar Daouk Street, Mina El Hosn Sector\nBeirut, Lebanon","contact_ctry_name":"Lebanon","contact_email":"mhammoud@omsar.gov.lb","contact_name":"Mirvat Hammoud","contact_organization":"Office of the Minister of State for Administrative Reform","contact_phone_no":"+961 (1) 371 505","submission_date":"2026-06-03T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p><p>&nbsp;</p><p><strong>E-Signature Foundations: Mapping, Roadmap, Legal Instrument Drafting and Capacity Building</strong></p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:277px\"><p><strong>Name of Project</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:329px\"><p><strong>GFPP for Lebanon Digital Acceleration Project (LDAP) - P181954</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\"><p><strong>Loan No/Credit No/ Grand Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\"><p><strong>TF-C8895</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\"><p><strong>Assignment Title</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\"><p><strong>E-signature Foundations: Mapping, Roadmap, Legal Instrument Drafting and Capacity Building</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\"><p><strong>Procurement Plan Ref Number</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\"><p><strong>LB-OMSAR-537755-CS-CQS</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\"><p><strong>Country of Delivery </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\"><p><strong>Lebanon</strong></p></td></tr></tbody></table><p>The <strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong> has received financing from the World Bank toward the cost of the <strong>Preparation Grant for the Lebanon Digital Acceleration Project (LDAP)</strong> and intends to apply part of the proceeds for the following consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include providing technical, legal, and advisory support to establish the practical foundations and pathways for the progressive use of electronic signatures in Lebanon. Running over an estimated implementation period of 15 weeks, the Services comprise three parallel workstreams:</p><ul><li><strong>Legal and Institutional Diagnostics:</strong> Reviewing Lebanon&#39;s existing e-signature landscape, benchmarking it against international frameworks (such as EU eIDAS and UNCITRAL Model Laws), and detailing three risk-based use cases across the public, private, and financial sectors.</li><li><strong>National Roll-out Strategy:</strong> Developing a phased short, medium, and long-term national roadmap and target model for wide e-signature deployment.</li><li><strong>Regulatory Drafting:</strong> Formulating issuance-ready amendments to Decree No. 14115/2024 to introduce a risk-proportionate, tiered approach for official documents.</li><li><strong>Institutional Strengthening:</strong> Assessing and building the operational readiness of the Lebanese Accreditation Council (COLIBAC) by designing its trust-service accreditation and conformity assessment model, preparing practical operational manuals, and delivering targeted capacity building to its core team.</li></ul><p>The detailed Terms of Reference (TOR) for the assignment is attached to this REOI<em>.</em></p><p>The <strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong> now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. <strong>Interested</strong> <strong>Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</strong></p><p>The best qualified firm to carry out the services will be selected in accordance with the Consultant&rsquo;s Qualifications Based Selection (CQS) method set out in the Regulations and based on the following shortlisting criteria:</p><ul><li>The Consultant shall be a qualified firm with demonstrated experience in delivering advisory, technical, and implementation support related to digital transformation, electronic transactions, or trusted digital services.</li></ul><p><strong>Firm Specific Experience</strong></p><ul><li>Proven experience in the design, implementation or operationalization of frameworks for electronic signature, digital trust, or electronic transaction frameworks, preferably in public-sector or regulated environments;</li><li>Experience supporting institutional readiness, capacity building, or governance frameworks related to digital services, trust services, or regulatory institutions;</li><li>Demonstrated ability to engage effectively with government institutions, regulators, and private-sector stakeholders, including facilitation of workshops and multi-stakeholder consultations;</li><li>Very Good understanding of international good practices and standards related to electronic signatures, trust services, or digital identity (e.g., eIDAS, UNCITRAL Model Laws, OECD and World Bank guidance and principles.</li><li>Proven institutional capacity to directly analyze, interpret, and evaluate complex legal codes, legislative decrees, national strategies, and sectoral regulations natively written in Arabic. And proven capability to produce and submit high-quality, professional-grade technical and legal deliverables concurrently in both English and Arabic.</li></ul><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>The attention of interested Consultants is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers dated September 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>Consultants may associate with other firms to enhance their qualifications, but <strong>should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy</strong>. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>Further information can be obtained at the address below during office hours (09:00 AM to 04:00 PM Beirut Time).</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>COB 18 June, 2026</strong>.</p><p><strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong></p><p>Technical Unit &ndash; Preparation Grant for Lebanon Digital Acceleration Project</p><p><strong>Attn</strong>: Ms. Mirvat Hammoud &ndash; Procurement Specialist</p><p><strong>Address</strong>: STARCO Building, Bloc A, 5th Floor</p><p>Omar Daouk Street, Mina El Hosn Sector</p><p>Beirut, Lebanon</p><p><strong>Tel</strong>: +961 (1) 371 505; ext. 160</p><p><strong>E-mail</strong>: <em>mhammoud@omsar.gov.lb</em></p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p><strong>PREPARATION GRANT FOR LEBANON DIGITAL ACCELERATION PROJECT (P181954)</strong></p><p><strong>E-Signature Foundations: Mapping, Roadmap, Legal Instrument Drafting and Capacity Building</strong></p><p><strong>Background </strong></p><p>Lebanon is facing a protracted, multidimensional crisis that has impaired state institutions and public service delivery. Fragmented digital systems, reliance on paper-based processes, and limited trust in electronic transactions continue to hinder efficiency, transparency, and accountability across the public and private sectors. These challenges are compounded by gaps in digital governance, incomplete regulatory activation, and limited institutional capacity to operationalize key digital enablers.</p><p>To address these issues, a strategic investment to modernize Lebanon&rsquo;s public sector through digital transformation, stimulate private sector growth, and accelerate the development of a robust digital economy is under preparation with World Bank support. The Lebanon Digital Acceleration Project (the &ldquo;Project&rdquo;) will establish secure, scalable, and resilient digital infrastructure including cloud services, data platforms, and cybersecurity systems that are essential for attracting investment and fostering innovation. By strengthening digital ID, e-signature capabilities, and the legal framework for digital transactions, the Project will improve the ease of doing business and enable trusted, efficient engagement between the public and private sectors. In parallel, the Project will advance key regulatory reforms in telecom, data protection, e-signature, and artificial intelligence (AI), while investing in Lebanon&rsquo;s digital talent pool. Together, these measures will lay the foundation for a more competitive, dynamic, and inclusive economy.</p><p>The World Bank&rsquo;s Grant Facility for Project Preparation (GFPP) has been extended to OMSAR to support Project preparation. The GFPP grant will be implemented by a Technical Unit (TU) housed within OMSAR.</p><p>An important enabler of digitalization is the electronic signature (e-signature), which represents data in electronic form logically associated with an electronic document or transaction and used by a signatory to indicate approval or intent. Under Lebanese Law No. 81 of 2018, electronic signatures and electronic writing, including those of official nature, are granted the same legal validity as paper-based ones subject to defined conditions related to integrity, identification, and evidentiary reliability. The law establishes a framework for trust services and assigns supervisory and accreditation responsibilities to the Lebanese Accreditation Council (COLIBAC), including defining accreditation requirements and procedures applicable to trust service providers and accreditors, and maintaining trusted lists of accredited entities.</p><p>While the legal framework is in place, COLIBAC is not yet fully operational and has been for a long period governed by a Board of Directors as an interim arrangement, composed of representatives from relevant ministries. In April 2026, as a recent important development, a Director General for COLIBAC has been appointed, and will ensure executive leadership, while of its governance and internal structures, remain in progress. A range of technical, institutional, and procedural measures and mechanisms will need to be put in place to further support the effective operationalization of COLIBAC, in line with its mandate. It is also noted that ongoing efforts to operationalize the e-signature framework, including work on the implementing decree, has been undertaken at the national level and shall be taken into consideration under this assignment to ensure continuity and avoid duplication.</p><p>It is also worth noting that OMSAR, in collaboration with OMSTAI and the World Bank, convened a multi-stakeholder workshop on February 12, 2026 to discuss the operationalization of electronic signatures in Lebanon and to build a shared understanding of the legal, technical, and institutional aspects of the existing e-signature ecosystem. The workshop convened representatives from key public institutions, including the Ministry of Justice, the Ministry of Industry, Banque du Liban, the Banking Control Commission of Lebanon, as well as legal and digital experts from the private sector. The discussions formulated a high-level roadmap that highlighted the need to establish the practical foundations and implementation pathways for the progressive use of electronic signatures under the current legal framework, including the importance of operationalizing COLIBAC by supporting the broader legal and governance arrangements needed to fulfil its mandate.</p><p>As a follow-up to the workshop, participants agreed on the establishment of an inter-institutional working group composed of representatives from the concerned ministries and institutions to support ongoing coordination, technical discussions, and the progressive operationalization of the electronic signature framework through the below phased approach:</p><ul><li>T0 (immediate phase):&nbsp; immediate measures that can be pursued under the current framework, including enabling lower-risk use cases and reliance, where appropriate, on foreign trust service providers for higher-assurance needs;</li><li>T1A (medium term phase) medium-term measures aimed at clarifying and broadening the interim recognition pathways for foreign providers;</li><li>T1B (medium term phase) simultaneously working to operationalizing COLIBAC and build its capacity; and</li><li>T2 longer-term legal and institutional reforms needed to support a mature domestic trust services ecosystem, including the revision of Law No. 81/2018 to modernize the framework and better align the governance model with international practice.</li></ul><p><strong>Assignment and Objectives</strong></p><p>The objectives of this assignment are to:</p><ol><li>Assess the current e-signature landscape (institutional, legal and regulatory, and governance foundations) of electronic signatures in Lebanon identifying gaps, ambiguities, and implementation challenges and benchmark it against international standards and best practices.</li><li>Provide illustrative risk-based use cases in the public, private and financial sector.</li><li>Produce a phased roadmap for reforming the institutional, legal and institutional landscape, and for scaling electronic signatures across the public sector, the financial sector and the private sector.</li><li>Assess and strengthen COLIBAC&rsquo;s institutional readiness and capacity needs to perform its mandate, including governance and decision-making processes, operational model accreditation/conformity assessments functions, requirements, evaluation criteria, and deliver capacity building to support effective operationalization.</li><li>Draft and validate amendments to Decree 14115/2024 to enable flexible, risk-proportionate use of e-signatures.</li><li>Facilitate coordination and alignment among key stakeholders, by engaging them at different points to validate findings and reach the above objectives.</li></ol><p><strong>Detailed Scope of Work and Deliverables</strong></p><p><strong>Workstream 1:&nbsp; Legal, Regulatory, and Institutional Review, Diagnostic and Benchmark of Electronic Signatures and Phased Roadmap</strong></p><p>It is to be noted that previous analyses have already been undertaken in this area, including the analysis of Law 81/2018. As such, the consultant will not duplicate existing work but shall, where applicable, draw on such analyses, which will be provided as an input. The consultant will focus on governance and institutional arrangements, and as such should extend the legal benchmarking beyond Law 81 itself to examine the broader legislative framework that confers mandates on the relevant institutions, including COLIBAC, in order to assess whether those mandates are sufficient and coherent and, where necessary, in need of adjustment.</p><p><strong>Workstream 1 &ndash; Part 1:</strong></p><ul><li>Review and analyze the existing legal, regulatory, policies, standards, practices, governance relevant to electronic signatures and trust services in Lebanon, including Law No. 81/2018, Decree No. 14115, and other relevant legal and sectoral instruments, with particular attention to the conditions for legal validity, evidentiary value, cross-border recognition and the use of foreign trust service providers; and identify related gaps, ambiguities, inconsistencies, and implementation challenges that may hinder effective use, recognition and phased adoption of electronic signatures;</li><li>Assess the current institutional framework on e-signatures including governance and regulatory structures. Clarify roles, mandates, and institutional responsibilities of relevant public entities, including COLIBAC&rsquo;s role, institutional set-up and structure, and internal systems and procedures, and interfaces with other relevant entities within the e-signature ecosystem, based on existing legal mandates. Benchmark Lebanon&rsquo;s legal and institutional framework on e-signatures against relevant international standards and good practices (e.g. relevant UNCITRAL Model Laws, EU eIDAS Regulation), including governance models, assurance levels, and risk-proportionate implementation approaches, to document related gaps and weaknesses;</li><li>Assess and document the types of electronic signatures and trust services including seals, electronic timestamps and electronic registered delivery services supported under the current framework;</li><li>Identify and present 3 (one for each level of assurance) illustrative examples for the deployment of electronic signature across different levels of assurance (simple, advanced and high-assurance use cases) in the public sector the private and financial sectors. Use cases shall be selected based on criteria such as legal readiness, institutional feasibility, and potential impact, including efficiency and simplification gains.&nbsp; For each use case, the Consultant shall: (i) describe the current as-is and proposed to-be processes at a high level; (ii) specify the appropriate type of electronic signature and related trust services applicable under the current legal and regulatory framework; (iii) assess the suitability of such application based on the level of transaction risk and, where relevant, propose risk-based adjustments or refinements to the existing legal or regulatory framework; (iv) identify the key actors involved and their respective roles; and (v) highlight the main legal, institutional, and technical enablers and constraints associated with each use case and proposed enhancement; and</li><li>Discuss and validate the findings with the key relevant stakeholders.</li></ul><p><strong>Workstream 1 &ndash; Part 2:</strong></p><p>The Consultant will develop a phased roadmap (short, medium and long term) and recommendations for wide roll-out of e-signature across the public sector, the financial sector and the private sector, building on the high-level roadmap produced during the February 2026 multi-stakeholder workshop and work conducted under this assignment.</p><p>The roadmap shall be formulated and shall propose recommended phasing, prioritization and tactical sequencing across several areas /elements, with an aim to ultimately align with best international practices and frameworks, to support a mature domestic trust services ecosystem The roadmap shall:</p><ul><li>Formulate recommendations on the legal, regulatory and institutional target model including:</li></ul><ul><li>Legal and Regulatory enablement, formulating needed clarifications, amendments, regulations and sectoral instruments;</li><li>Governance and institutional set-up: including roles of the relevant institutions and their interaction model</li><li>Provide recommendations and phased plan for wide roll-out of e-signature across the public sector, private sector and financial sector encompassing the following elements:</li><li>Roll Out Plan including Identification, prioritization and sequencing of implementation actions and interventions, supported by a phased implementation timetable Operational procedures and service integration (workflows, document management, and validation processes);</li><li>Technical integration considerations required to enable the use of electronic signatures within government platforms and services, including integration with trust service providers through available interfaces (e.g., APIs), and, where relevant, interoperability with existing digital systems and future digital identity frameworks;</li><li>Security and assurance levels and their legal and operational applicability; and</li><li>Directional financial and sustainability model and considerations.</li></ul><p>The national roadmap will be validated through engagement with key stakeholders before it is submitted in final form.</p><p><strong>Deliverables:</strong></p><ul><li><strong><em>D1.1 (Workstream 1- Part 1):</em></strong><em> Legal, regulatory, and institutional assessment of electronic signatures in Lebanon, including gap analysis, international benchmarking, governance and institutional roles;</em></li><li><strong><em>D1.2: (Workstream 1- Part 2):</em></strong><em> Phased Roadmap - Recommended Target Model (Legal, Institutional and Regulatory) and Recommendations and Phased Plan for roll-out across the public, private and financial sector.</em></li></ul><p><strong>Workstream 2: Amendment of e-signature Decree 14115/2024 </strong></p><p>Building on existing work and draft instruments developed in relation to the implementation of the e-signature framework, the consultant shall draft the necessary amendment to Decree 14115 to clarify provisions and provide practical implementation pathways for e-signature in the public sector, basing the drafting on the recommendations produced by the workshop on e-signature held on February 12, 2026 and work under this assignment, and shall closely coordinate with OMSAR, OMSTAI, and relevant national stakeholders including the Ministry of Justice, the Ministry of Industry, and other relevant entities.</p><p>Amendments to include the following:</p><ul><li>Introducing risk proportionate tiered approach to the use of e-signatures on official documents, allowing public officials to rely on lower-assurance e-signatures for low-risk categories of official documents, within the flexibilities already embedded in Law 81/2018;</li><li>Strengthening the legal basis and framework for high-assurance e-signature including clarification of its legal evidentiary value, and extending the list of supervisory authorities that can be used in high-assurance scenarios, to accelerate implementation; and</li><li>Proposing and refining practical implementation details across key areas related to electronic signature in the public sector including administrative and technical procedures for electronic documents, archiving, storage and lifecycle management, and the use of electronic signature, seals, electronic timestamps and electronic registered delivery services.</li></ul><p>The consultant shall closely engage throughout the assignment with key relevant stakeholders to develop, discuss and validate the proposed amendments (revision drafts to be iteratively proposed and validated) in order to have an issuance ready version of the amended decree).</p><p><strong>Deliverables:</strong></p><ul><li><strong>D2.1: </strong><em>Initial Draft of the amended decree</em>;</li><li><strong>D2.2: </strong><em>Final Draft of the amended decree (after validation by the relevant stakeholders)</em><strong>.</strong></li></ul><p><strong>Workstream 3: Institutional Readiness and Capacity Building for COLIBAC </strong></p><p>This workstream aims to build the capacity of COLIBAC in effectively establishing an operational model for accreditation and conformity assessments.</p><ul><li>Design and deliver targeted capacity-building activities for a &ldquo;core team&rdquo;, whose composition will be agreed upon, encompassing members from COLIBAC (executive leadership, board and staff (if applicable) and representatives from COLIBAC and from other ministries and public entities (as applicable), who may be directly involved in e-signature, focusing on e-signature operating models including trust service governance models, accreditation and conformity assessments principles;</li><li>Propose/adapt /support COLIBAC in adapting its internal organizational structure, staffing and internal systems and procedures&nbsp; to provide for a core operational model suited to operationalize accreditation and conformity assessment activities across technical, administrative, financial, and security dimensions, including the accreditation application and review process, the evaluation criteria process, decision-making processes and roles and responsibilities, ongoing supervision and compliance monitoring, and the publication and maintenance of the public register of accredited providers, in line with the applicable legal framework;</li><li>Develop &ldquo;a minimum required set&rdquo; of standardized technical, procedural and operational guidance, templates, and artifacts, to enable COLIBAC to effectively perform its functions related to e-signature, aligned with the proposed internal structure while remaining adaptable to potential variations;</li><li>Engage with relevant stakeholders including the core team / selected members of the core team and representatives from other institutions if relevant to present and discuss this minimum required set; and</li><li>Prepare and circulate training materials related to above artifacts, and deliver related capacity-building sessions to relevant stakeholder at COLIBAC and other concerned entities if applicable.</li></ul><p><strong>Deliverables:</strong></p><ul><li><strong><em>D3.1:</em></strong><em> An assessment report (drawing on workstream 1) on COLIBAC&rsquo;s current institutional readiness, including governance, operational, and capacity aspects;</em></li><li><strong><em>D3.2:</em></strong><em>&nbsp; Targeted capacity-building activities for the &ldquo;core team&rdquo; focusing on e-signature operating models including trust service governance models, accreditation and conformity assessments principles.;</em></li><li><strong><em>D3.3:</em></strong><em> Proposed internal structure and operational model for COLIBAC covering accreditation requirements, evaluation and review procedures, decision-making processes and supervision mechanisms;</em></li><li><strong><em>D3.4:</em></strong><em> Proposed practical operational manuals, guidance materials and artifacts supporting the proposed structure and operational model, validated with relevant stakeholders;</em></li><li><strong><em>D3.5:</em></strong><em> Targeted Capacity Building on the D3.4 material to relevant stakeholders at COLIBAC and other concerned entities.<strong>&nbsp; </strong></em></li></ul><p><strong>Proposed Methodology and Work Plan</strong></p><p>As part of the proposal, the service provider shall present a clear, coherent, and technically sound approach to fulfilling the 3 workstreams of the Scope of Work.</p><p><strong>Cross Cutting Requirements</strong></p><p><strong>Vendor Neutrality and Future-Proofing</strong></p><p>All designs, architectures, recommendations, and future implementation pathways produced under this assignment shall remain vendor-neutral, standards-based, and modular, avoiding proprietary technologies or exclusive reliance on any single solution provider.</p><p><strong>Change Management and Adoption</strong></p><p>The consultant shall identify key change management and adoption risks associated with future implementation and propose mitigation measures, including user onboarding, institutional capacity building, and communication considerations.</p><p><strong>Qualifications</strong></p><p>The Consultant shall be a qualified firm with demonstrated experience in delivering advisory, technical, and implementation support related to digital transformation, electronic transactions, or trusted digital services.</p><p><strong>Firm Specific Experience</strong></p><ul><li>Proven experience in the design, implementation or operationalization of frameworks for electronic signature, digital trust, or electronic transaction frameworks, preferably in public-sector or regulated environments;</li><li>Experience supporting institutional readiness, capacity building, or governance frameworks related to digital services, trust services, or regulatory institutions;</li><li>Demonstrated ability to engage effectively with government institutions, regulators, and private-sector stakeholders, including facilitation of workshops and multi-stakeholder consultations;</li><li>Very Good understanding of international good practices and standards related to electronic signatures, trust services, or digital identity (e.g., eIDAS, UNCITRAL Model Laws, OECD and World Bank guidance and principles.</li><li>Proven institutional capacity to directly analyze, interpret, and evaluate complex legal codes, legislative decrees, national strategies, and sectoral regulations natively written in Arabic. And proven capability to produce and submit high-quality, professional-grade technical and legal deliverables concurrently in both English and Arabic.</li></ul><p>&nbsp;</p><p><strong>Team Composition</strong></p><p>The team must have demonstrated success in similar projects in MENA or emerging markets.</p><p><strong>Electronic Signature / Digital Trust Senior Specialist / Lead </strong></p><p>The Consultant shall propose a senior-level expert (minimum 10&ndash;15 years of experience) with recognized expertise in digital trust frameworks demonstrating.</p><ul><li>Proven experience in the design, implementation, or supervision of electronic signature and trust service ecosystems (including trust service providers (TSPs), PKI infrastructures, and digital identity systems);</li><li>Deep technical understanding of assurance levels and risk-based approaches to trust services deployment;</li><li>Practical experience with public key infrastructure (PKI), certificate lifecycle management, and trust service architectures;</li><li>Familiarity with international standards and frameworks (e.g., ETSI, ISO, and comparative frameworks to eIDAS);</li><li>Experience advising governments, regulators, or supervisory authorities on policy, regulatory, and operational aspects of digital trust;</li><li>Strong ability to bridge technical, legal, and institutional dimensions, and to lead multidisciplinary teams.</li></ul><p><strong>Senior Legal / Regulatory Expert</strong></p><p>The consultant shall include a senior legal expert (minimum 10&ndash;12 years of experience) specialized in electronic / digital law and regulation, demonstrating:</p><ul><li>Extensive experience in electronic transactions laws and digital signature frameworks;</li><li>Strong familiarity with comparative legal frameworks and their applicability to national contexts;</li><li>Experience in drafting or advising on laws, decrees, regulatory instruments, or implementing guidelines;</li><li>Understanding of the legal implications of different assurance levels, evidentiary value of electronic signatures, and liability frameworks;</li><li>Strong understanding of Lebanon&rsquo;s legal and administrative system, with proven ability to translate requirements into practical and implementable legal instruments.</li><li>Mandatory Fluency in Arabic, for reviewing and drafting decrees, regulatory instruments or implementing guidelines.</li></ul><p><strong>Institutional Capacity-Building / Change Management Expert</strong></p><p>The Consultant shall include a senior expert (minimum 10 years of experience) in institutional strengthening and public-sector reform demonstrating:</p><ul><li>Proven experience in conducting institutional diagnostics, organizational assessments, and governance design;</li><li>Experience in building operational capacity (including procedures, workflows, and internal controls particularly in public sector contexts.</li><li>Strong track record in capacity-building program design and delivery;</li><li>Experience in stakeholder engagement, inter-institutional coordination, and change management in complex public-sector environments;</li><li>Familiarity with digital transformation programs and the adoption of new regulatory or technical frameworks;</li><li>Ability to design and support the operationalization of core working groups, coordination mechanisms, and governance structures.</li></ul><p><strong>Team Technical Expertise</strong>: the proposed team shall collectively demonstrate expertise in:</p><ul><li>Electronic signature assurance mechanisms and frameworks and cryptographic concepts;</li><li>Auditability, evidence preservation, and verification models for electronic transactions; and</li><li>Translating legal and regulatory requirements into legal instruments, operational and technical guidelines and controls.</li></ul><p><strong>Compliance Requirements</strong></p><p>The Consultant shall perform all services in accordance with:</p><ul><li>Applicable Lebanese laws, regulations, and administrative frameworks relevant to electronic transactions and digital services.</li><li>World Bank procurement, integrity, and operational policies applicable to the assignment.</li><li>Any applicable data protection, confidentiality, and information security requirements.</li></ul><p>In addition, the consultant must comply with the following Environmental and Social (E&amp;S) requirements aligned with the World Bank Environmental and Social Framework (ESF) and the Project commitments:</p><ol><li><ol><li><strong>Code of Conduct (CoC)</strong></li></ol></li></ol><p>All personnel must sign and follow a CoC covering data confidentiality, respectful conduct, non-discrimination, and zero tolerance for SEA/SH.</p><ol><li><ol><li><strong>Labor and Working Conditions </strong></li></ol></li></ol><p>The firm must ensure fair labor practices and safe working conditions and provide an internal worker grievance mechanism for its staff.</p><ol><li><ol><li><strong>Data Security, Privacy, and Cybersecurity </strong></li></ol></li></ol><p>All data handled under this assignment must be securely stored, accessed only by authorized staff, and managed using privacy-by-design and cybersecurity best practices. Any data breach must be immediately reported.</p><ol><li><ol><li><strong>Stakeholder Engagement and Grievance Redress </strong></li></ol></li></ol><p>Consultations must be inclusive and accessible, with all feedback documented. Stakeholders must be informed that complaints can also be submitted through the Project&rsquo;s Grievance Mechanism that will be shared.</p><ol><li><ol><li><strong>SEA/SH Prevention</strong></li></ol></li></ol><p>The firm must enforce zero tolerance for SEA/SH and ensure staff follow appropriate conduct and reporting procedures when engaging with stakeholders.</p><ol><li><ol><li><strong>Environmental Considerations for ICT (ESS3)</strong></li></ol></li></ol><p>Any ICT equipment or data storage devices used must be managed responsibly, including secure data wiping and environmentally sound disposal.</p><p><strong>Reporting, Deliverables, and Contract Management</strong></p><p><strong>Project Oversight and Management Structure</strong></p><p>&nbsp;A Technical Committee (TC) will be established to provide strategic direction, oversight, and effective management of the engagement. Chaired by the Grant Coordinator and composed of members from OMSAR, OMSTAI, Ministry of Industry, Ministry of Justice, and other involved ministries, as applicable, the TC serves as the primary governing body responsible for reviewing the firm&rsquo;s progress and ensuring alignment with national digital transformation goals.</p><p><strong>Reporting Obligations </strong></p><p>The Consultant will report directly to the Grant Coordinator. In addition to the contractual deliverables, the Consultant shall submit summary progress reports on a monthly basis (at minimum), including at minimum:</p><ul><li>An executive summary.</li><li>The status of the deliverables.</li><li>Identified risks and mitigation measures.</li><li>Practical next steps for relevant institutions.</li></ul><p><strong>The TC Approval Gate/ Grant Coordinator and Deliverable Acceptance </strong></p><p>The Grant Coordinator, in consultation with the TC and relevant public entities, is the sole authority empowered to formally accept and approve project deliverables. The following administrative process applies to every milestone:</p><ul><li><strong>Submission:</strong> All deliverables listed in the TOR are subject to formal review. The Consultant shall submit each deliverable and a summary progress report to the TC Chairperson.</li><li><strong>Validation:</strong> For each milestone, payment cannot be processed without written validation or sign-off from the Grant Coordinator, based in the TC&rsquo;s recommendation.</li><li><strong>Formal Acceptance:</strong> A &quot;Certificate of Acceptance&quot; or formal written notice signed by the TC Chairperson is a mandatory prerequisite for the release of payment.</li></ul><p><strong>Payment Schedule and Invoicing </strong></p><p>Payments will be made upon the satisfactory acceptance of the deliverables specified in the below Timeframe table. To initiate payment, the Consultant must submit an administrative package containing the Official Invoice, evidence of delivery, and the Acceptance Notice delivered by the TC Chairperson. In addition, for Workstream 3, signed attendance sheets of training participants must be provided as proof of capacity building.</p><p><strong>Intellectual Property and Confidentiality</strong></p><ul><li><strong>Ownership:</strong> All documents, data, analyses, and materials produced shall become the exclusive property of Government of Lebanon. Final payment is contingent upon the transfer of all such intellectual property.</li><li><strong>Confidentiality:</strong> The Consultant shall maintain strict confidentiality of all information accessed during the assignment and ensure no information is disclosed outside the scope of this contract.</li></ul><p><strong>Timeframe and Payment Milestones</strong></p><p>The engagement will be completed in approximately <strong>15 weeks</strong>. The Consultant shall undertake the three workstreams in parallel, prioritizing tasks with minimal interdependencies to ensure efficient progress. Payments will be made upon formal written acceptance of the deliverables by the Chairperson of the Project Technical Committee (TC)<strong>.</strong></p><p>The following schedule outlines the expected submission timeline for each deliverable over the 15-week engagement period.</p><p>Table 1: Assignment Timeline and Deliverable Sequencing:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:617px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:136px\"><p><strong>Workstreams </strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:325px\"><p><strong>Deliverable Reference</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:156px\"><p><strong>Submission Deadline (from Start Date)</strong></p></td></tr><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:113px; width:136px\"><p><strong>Workstream 1:</strong> Legal, Regulatory, and Institutional Review, Diagnostic and Benchmark of Electronic Signatures</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:113px; width:325px\"><p><strong>D1.1: </strong>Legal, regulatory, and institutional assessment of electronic signatures in Lebanon, including gap analysis, international benchmarking, governance and institutional roles.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:113px; width:156px\"><p>Week 4</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:126px; width:325px\"><p><strong>D1.2:</strong> Recommended Target Model (Legal, Institutional and Regulatory) and Recommendations and Phased Plan for roll-out across the public, private and financial sector</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:126px; width:156px\"><p>Week 8</p></td></tr><tr><td rowspan=\"2\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:38px; width:136px\"><p><strong>Workstream 2:</strong>&nbsp; Amendment of e-signature Decree 14115/2024</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; width:325px\"><p><strong>D2.1</strong>: Initial Draft of the amended decree</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; width:156px\"><p>Week 10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:86px; width:325px\"><p><strong>D2.2:</strong> Final Draft of the amended decree (after validation by the relevant stakeholders)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:86px; width:156px\"><p>Week 14</p></td></tr><tr><td rowspan=\"5\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:97px; width:136px\"><p><strong>Workstream 3:</strong> Institutional Readiness &amp; Capacity Building for COLIBAC</p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:325px\"><p><strong>D3.1:</strong> An assessment report on COLIBAC&rsquo;s current institutional readiness, including governance, operational, and capacity aspects.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:156px\"><p>Week 4</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:137px; width:325px\"><p><strong>D3.2:</strong>&nbsp; Targeted capacity-building activities for the &ldquo;core team&rdquo; focusing on e-signature operating models including trust service governance models, accreditation and conformity assessments principles.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:137px; width:156px\"><p>Week 8</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:115px; width:325px\"><p><strong>D3.3:</strong> Proposed internal structure and operational model for COLIBAC covering accreditation requirements, evaluation and review procedures, decision-making processes and supervision mechanisms;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:115px; width:156px\"><p>Week 10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:56px; width:325px\"><p><strong>D3.4:</strong> Proposed practical operational manuals, guidance materials and artifacts supporting the proposed structure and operational model, validated with Stakeholders;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:56px; width:156px\"><p>Week 14</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; width:325px\"><p><strong>D3.5</strong>: Targeted Capacity Building on the D3.4 material to relevant stakeholders at COLIBAC and other concerned entities.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:103px; width:156px\"><p>Week 15</p></td></tr></tbody></table><p>&nbsp;</p><p>Table 2: Payment Milestones:</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:614px\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:55px; width:104px\"><p><strong>Payment Milestone</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:55px; width:282px\"><p><strong>Linked Deliverables</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:55px; width:140px\"><p><strong>Required Approval</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:55px; width:88px\"><p><strong>Payment (%of Total)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:57px; width:104px\"><p><strong>Milestone 1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:282px\"><p><strong>D1.1</strong> (Diagnostic &amp; Benchmark)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:88px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:62px; width:104px\"><p><strong>Milestone 2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:62px; width:282px\"><p><strong>D1.2 </strong>(Roadmaps &amp; Roll-out Plan)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:62px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:62px; width:88px\"><p><strong>20%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:56px; width:104px\"><p><strong>Milestone 3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:56px; width:282px\"><p><strong>D3.1 &amp; D3.2</strong> (Assessment Report on COLIBAC and Core Team Training)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:56px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:56px; width:88px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:55px; width:104px\"><p><strong>Milestone 4</strong></p><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:282px\"><p><strong>D2.1</strong> (Initial Decree Draft)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:88px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:57px; width:104px\"><p><strong>Milestone 5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:282px\"><p><strong>D3.3 &amp; D3.4</strong> (Operational Model and Manuals)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:88px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:57px; width:104px\"><p><strong>Milestone 6</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:282px\"><p><strong>D2.2</strong> (Final Validated Decree)</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:57px; width:88px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:55px; width:104px\"><p><strong>Milestone 7</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:282px\"><p><strong>D3.5</strong> (Final Capacity Building)<strong> </strong></p><p><strong>15%</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:140px\"><p>Technical Committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:55px; width:88px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:27px; width:104px\"><p><strong>Total</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:27px; width:282px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:27px\"><p>&nbsp;</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:27px; width:88px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00448411","notice_type":"Request for Expression of Interest","noticedate":"02-Jun-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-06-02T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"India","project_id":"P178581","project_name":"Assam Resilient Rural Bridges Program","bid_reference_no":"IN-PWRD-534942-CS-QCBS","bid_description":"Independent Verification Agent (IVA) for providing services for results verification of the proposed World Bank financing Assam Resilient Rural Bridges Program (ARRBP)","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"O/o the Chief Engineer (EAP),\n                  ARRTI Complex, Fatasil Ambari, Guwahati-25","contact_ctry_name":"India","contact_email":"sanjita.bodo13@gmail.com","contact_name":"Sanjita  Bodo","contact_organization":"Public Works Roads Department, Assam","contact_phone_no":"9435553587","submission_date":"2026-06-02T00:00:00Z","notice_text":"<p>RFP No. CE/ASBIP/CS-IVA/NCB/24/2022/12 Dated: Guwahati, the 16th December, 2022</p><p>Sub: Invitation of Proposals for &ldquo;Engaging the Independent Verification Agent for providing consultancy services for results verification of the proposed World Bank financing Assam Resilient Rural Bridge Program &rdquo;</p><p>Dear Sir/Sirs<br />1. The Govt. of Assam through the Govt. of India has applied for financing from the International Bank for Reconstruction and Development (IBRD) (hereinafter called &ldquo;loan&rdquo;) toward the cost of Assam Resilient Rural Bridge Program (ARRBP). The Borrower intends to apply a portion of the proceeds of this loan towards eligible payments under the contract for which this Request for Proposals is issued. Payments by the Bank will be made only at the request of the PWRD, Assam and upon approval by the Bank, and will be subject, in all respects, to the terms and conditions of the loan. The loan prohibits a withdrawal from the loanaccount for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import, to the knowledge of the Bank, is prohibited by a decision of the United Nations Security council taken under Chapter VII of the Charter of the United Nations. No party other than the PWRD, Assam shall derive any rights from the loan or have any claims to the proceeds of the loan.</p><p><br />2. The Chief Engineer (EAP), PWRD Assam, on behalf of the Governor of Assam invites proposals for providing the consulting services for results verification of the proposed World Bank financing Assam Resilient Rural Bridge Program through a Independent Verification Agent.</p><p><br />3. A brief description of services is given in the Terms of Reference.(Section 7)</p><p>4. You are invited to submit technical and financial proposals along with proof of eligibility as per the RFP.</p><p><br />5. A firm will be selected under Quality and Cost Based Selection Method (Lump Sum) and Full Technical Proposal (FTP) format as described in this RFP</p><p><br />6. The RFP includes the following documents:<br />Section 1 - Letter of Invitation<br />Section 2 - Instructions to Consultants (including Data Sheet)<br />Section 3 - Technical Proposal - Standard Forms<br />Section 4 - Financial Proposal - Standard Forms<br />Section 5 &ndash;Eligible Countries<br />Section 6 &ndash; Bank&rsquo;s Policy &ndash; Corrupt and Fraudulent Practices<br />Section 7 - Terms of Reference<br />Section 8 - Standard Forms of Contract (Time-based)</p><p><br />7. Please submit your proposals (Technical &amp; Financial) in the website: http://www.assamtenders.gov.in. latest by 1400 hrs on 17th January, 2023 with three scanned hard copies (one original and two copies) by hand/courier service/post at the following address on or before 1430 hrs on 17th January, 2023</p><p>Address: Chief Engineer (EAP), PWRD,<br />ARR&amp;TI Complex, Fatasil Ambari,<br />Guwahati-25, Assam, India</p>"},{"id":"OP00438816","notice_type":"Request for Expression of Interest","noticedate":"17-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-05-01T00:00:00Z","submission_deadline_time":"00:00","project_ctry_name":"Nigeria","project_id":"P508383","project_name":"Building Resilient Digital Infrastructure for Growth - BRIDGE","bid_reference_no":"NG-FMCIDE-544870-CS-QCBS","bid_description":"Engagement of Environmental and Social Risk Management Technical Assistance","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"6th Floor, Galaxy Backbone Building\n1243 Kur Mohammed Ave, Central Business District\n900103, Abuja","contact_ctry_name":"Nigeria","contact_email":"jumoke.akande@fmcide.gov.ng","contact_name":"Jumoke  Akande","contact_organization":"Federal Ministry of Communications, Innovation and Digital Economy","contact_phone_no":"8182466680","contact_web_url":"https://fmcide.gov.ng/","submission_date":"2026-04-17T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST FOR ENGAGEMENT OF ENVIRONMENTAL AND SOCIAL RISK MANAGEMENT TECHNICAL ASSISTANCE</strong></p>\n\n<p>BUILDING RESILIENT DIGITAL INFRASTRUCTURE FOR GROWTH - BRIDGE</p>\n\n<p>Project Number: P508383</p>\n\n<p>Assignment Reference: NG-FMCIDE-544870-CS-QCBS</p>\n\n<p>Assignment Title:</p>\n\n<p>ENGAGEMENT OF ENVIRONMENTAL AND SOCIAL RISK MANAGEMENT TECHNICAL ASSISTANCE</p>\n\n<p>The Federal Government of Nigeria (the &ldquo;Government&rdquo;) has applied for financing from the World Bank towards the cost of the &lsquo;Building Resilient Digital Infrastructure For Growth - Bridge&rsquo;, a Project aimed at deploying a 90,000km Fibre Optic Network. This will be structured as a Public Private Partnership (PPP) implemented through a Special Purpose Vehicle (the &ldquo;SPV&rdquo;) company. The Government intends to apply part of the proceeds for Engagement of Environmental and Social Risk Management Technical Assistance.</p>\n\n<p><br />\n<strong>OBJECTIVES AND SCOPE OF THE CONSULTANCY</strong></p>\n\n<p>The main objective of this consultancy is to provide professional E&amp;S support to the BRIDGE PIU, ensuring that project activities comply with Nigeria&rsquo;s environmental and social regulations and the World Bank ESF (ESS1-ESS10) throughout the project lifecycle. The TA will assist the PIU E&amp;S Unit in reviewing and implementing E&amp;S Risk Management Instruments prepared by competitively selected and competent E&amp;S consultants.</p>\n\n<p>The assignment aims to support the PIU to:</p>\n\n<p><strong>Review of Environmental and Social Risk Management Instruments:</strong></p>\n\n<p>Support the E&amp;S Unit of the PIU in the review and implementation of all required E&amp;S instruments including site-specific ESIA/ESMPs, Occupational Health and Safety Plans, Resettlement Policy Framework and RAPs, Stakeholder Engagement Plan and GM, Labor Management Procedures, GBV/SEA Action Plan, Security Management Plan, Chance Finds Procedure; etc. ensuring they meet the World Bank and national standards consistent with the ESCP and the Project Operational Manual (POM).</p>\n\n<p><strong>Risk Identification and Mitigation:&nbsp;</strong></p>\n\n<p>Advise the PIU E&amp;S Risk Management Unit on identifying and managing environmental and social risks and impacts (including cumulative and climate-related risks) associated with fiber deployment (e.g. land disturbance, vegetation clearing, erosion, pollution, community health and safety, labor influx, GBV/SEA, etc.). Support in the application of the mitigation hierarchy (avoidance, minimization, mitigation) in site selection and design.</p>\n\n<p><strong>Institutional Capacity Building</strong>:&nbsp;</p>\n\n<p>Support and assist the PIU and SPV E&amp;S staff in strengthening internal E&amp;S management systems (procedures, checklists, reporting etc.).</p>\n\n<p><strong>Stakeholder and Community Engagement:</strong>&nbsp;</p>\n\n<p>Assist the PIU E&amp;S Risk Management Unit in executing the Stakeholder Engagement Plan and GM, ensuring inclusive, culturally appropriate consultations, effective communication of project information, diverse languages, accessible format, and safe grievance mechanisms (including SEA/SH-sensitive channels) for all stakeholders, especially vulnerable groups and persons living with disabilities (PWD) in reference to ESIRT procedures.</p>\n\n<p>The consultancy shall be undertaken over 365 days from contract date.&nbsp;</p>\n\n<p>All reports shall be submitted in English, in editable and PDF formats.</p>\n\n<p>The Federal Ministry of Communications, Innovation and Digital Economy now invites eligible consulting firms to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria for the Consultant are set out below:</p>\n\n<ol>\n\t<li>At least seven (7) years of relevant professional experience in environmental and social risk management for large-scale infrastructure or linear infrastructure (roads, transmission lines, pipelines, fiber) in fragile/security-affected areas. Experience with World Bank ESF post-2018 with ESIRT and SEA/SH GPN implementation on civil works is an added advantage</li>\n\t<li>Experience working with multilateral development banks (MDBs), development finance institutions (DFIs), and government entities on projects that require compliance with international environmental and social risk management.</li>\n\t<li>Proven track record working on fiber optic or digital infrastructure deployment projects, particularly in complex or multi-jurisdictional environments, with understanding of sector-specific E&amp;S risks. Experience with digital tools (GRM case management, GIS, Kobo, Power BI dashboards) is an added advantage.</li>\n\t<li>Proven, hands-on experience in the application and supervision of the World Bank Environmental and Social Framework (ES as well as familiarity with Nigerian environmental and social laws, regulations, and permitting requirements.</li>\n\t<li>Demonstrated expertise in key safeguard areas, including environmental and social impact assessment, stakeholder engagement and consultation, grievance redress mechanisms (GRM), labor and working conditions, occupational health and safety (OHS), biodiversity management, land acquisition and resettlement, and prevention of GBV/SEA/SH risks. Demonstrated monitoring expertise: It is required that qualified firms will be able to verifiably demonstrate that they have extensive experience in undertaking project E&amp;S monitoring and quality assurance, for infrastructure development projects.</li>\n\t<li>Strong experience engaging with government agencies, project-affected communities, contractors, and other stakeholders, including facilitation of inclusive consultations, management of grievances, and coordination with regulatory authorities.</li>\n\t<li>Excellent analytical, technical writing, and presentation skills in English, with proven ability to prepare high-quality safeguard instruments, monitoring reports, advisory notes, and inputs acceptable to international financing institutions.</li>\n\t<li>Demonstrated ability to lead multidisciplinary teams, supervising engineers, contractors, and financiers, and ensure timely delivery of outputs while maintaining high professional and ethical standards.</li>\n\t<li>The firm shall demonstrate capacity for nationwide deployment (across Nigeria&rsquo;s six (6) geopolitical zones).. Ability to obtain permits or verifiable field deployment plans within the geopolitical zones is necessary.</li>\n</ol>\n\n<p>Key Experts will not be evaluated at the shortlisting stage.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; February 2025 (&ldquo;Procurement Regula-tions&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. A Consultant will be selected in accordance with the Quality And Cost-Based Selection method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours from</p>\n\n<p>9:00 am to 3:00 pm (local time).</p>\n\n<p>Expressions of Interest must be delivered in written form to the email address as follows:</p>\n\n<p>bridge_procure@fmcide.gov.ng or in person, to the address below, by 11:59 PM, Friday 1st May 2026.&nbsp;</p>\n\n<p>All Expressions of Interest must be clearly marked &#39;Expression of Interest &ndash; Nigeria&rsquo;s Project Bridge &ndash; Engagement of Environmental and Social Risk Management Technical Assistance - [Company Name]&#39;.&nbsp;</p>\n\n<p>Project Implementation Unit - Bridge</p>\n\n<p>6th Floor, Galaxy Backbone Building</p>\n\n<p>1243 Kur Mohammed Ave, Central Business District</p>\n\n<p>900103, Abuja, FCT Nigeria.</p>"},{"id":"OP00438422","notice_type":"Request for Expression of Interest","noticedate":"14-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-04-29T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Nigeria","project_id":"P508383","project_name":"Building Resilient Digital Infrastructure for Growth - BRIDGE","bid_reference_no":"NG-FMCIDE-542749-CS-QCBS","bid_description":"Engagement of Consultant for the SPV Design and Human Capital Strategy","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Project Bridge PIU\n6th Floor, Galaxy Backbone, 1243 Kur Mohammed Ave, CBD, 900103, Abuja","contact_ctry_name":"Nigeria","contact_email":"projectbridge@fmcide.gov.ng","contact_name":"Jumoke  Akande","contact_organization":"Federal Ministry of Communications, Innovation and Digital Economy","contact_phone_no":"8182466680","contact_web_url":"https://fmcide.gov.ng/","submission_date":"2026-04-14T00:00:00Z","notice_text":"<p><strong>FEDERAL REPUBLIC OF NIGERIA </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST FOR FOR CONSULTANCY FOR THE SPV DESIGN AND HUMAN CAPITAL STRATEGY FOR PROJECT BRIDGE</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>NIGERIA </strong></p>\n\n<p><strong>BUILDING RESILIENT DIGITAL INFRASTRUCTURE FOR GROWTH - BRIDGE </strong></p>\n\n<p>&nbsp;</p>\n\n<p>Project Number: _ P508383</p>\n\n<p><strong>Assignment Title: </strong><strong>Engagement of </strong><strong>Consultant for the SPV Design and Human Capital Strategy for Project Bridg</strong><strong>e</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Reference No. (as per Procurement Plan): NG-FMCIDE-542749-CS-QCBS</p>\n\n<p>The Federal Government of Nigeria (the &ldquo;Government&rdquo;) has applied for financing from the World Bank towards the cost of the &lsquo;Building Resilient Digital Infrastructure for Growth - Bridge&rsquo;, a Project aimed at deploying a 90,000km Fibre Optic Network. This will be structured as a Public Private Partnership (PPP) implemented through a Special Purpose Vehicle (the &ldquo;SPV&rdquo;) company. The Government intends to apply part of the proceeds for the engagement of a consultant for the SPV Design and Human Capital Strategy for Project Bridge (the &ldquo;Services&rdquo;).</p>\n\n<p><strong>OBJECTIVES AND SCOPE OF THE CONSULTANCY</strong></p>\n\n<p>The main objective of this consultancy is to support with the establishment and operational readiness of the Project BRIDGE SPV through the provision of organizational design and human capital strategy advisory services, including staffing frameworks and implementation ready mobilization planning.</p>\n\n<p>The Consultant&rsquo;s role under this assignment is strictly advisory in nature. The Consultant shall support the Client in developing staffing frameworks and identifying potential candidates where required; however, the Consultant shall not undertake recruitment activities or make any hiring or appointment decisions. All final selection decisions shall rest solely with the SPV.</p>\n\n<p>All reports shall be submitted in English, in editable and PDF formats.</p>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment can be found at the following link: </strong>b.link/ToR-SPV&amp;HumanCapitalStrategy</p>\n\n<p>The Federal Ministry of Communications, Innovation and Digital Economy now invites eligible consulting firms to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria for the Consultant are set out below:&nbsp;</p>\n\n<p>The consulting firm shall:</p>\n\n<ol>\n\t<li>Methodology and Understanding of SPV Operationalisation\n\t<ul>\n\t\t<li>demonstrate a strong understanding of operationalising a new entity or Special Purpose Vehicle (SPV).</li>\n\t\t<li>demonstrate experience in organisational design, institutional setup, or human capital strategy for new organisations or complex projects.</li>\n\t\t<li>demonstrate the ability to develop practical and implementable organisational structures, staffing frameworks, and governance arrangements.</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Relevant Experience with Greenfield Entities or Infrastructure SPVs\n\t<ul>\n\t\t<li>have at least seven (7) years&rsquo; experience in organisational design, institutional setup advisory services, or human capital strategy.</li>\n\t\t<li>demonstrate experience supporting the establishment of greenfield entities or project companies, including SPVs. Experience working within the telecommunications, fibre-optic infrastructure, or similar infrastructure sectors will be considered an added advantage.</li>\n\t\t<li>demonstrate experience identifying and assessing senior-level local and international talent.</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Key Experts will not be evaluated at the shortlisting stage.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.13, 3.15, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; February 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. A Consultant will be selected in accordance with the Consultant Qualification Selection method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;Further information can be obtained at the address below during office hours from 9:00 am to 3:00 pm (local time).</p>\n\n<p>Expressions of interest must be delivered in written form to the email address as follows: Projectbridge@fmcide.gov.ng or in person, to the address below, <strong>by 29th April 2026. </strong></p>\n\n<p>All Expressions of Interest must be clearly marked &#39;Expression of Interest &ndash; Nigeria&rsquo;s Project Bridge &ndash;SPV Design and Human Capital Strategy for Project Bridge- [Company Name]&#39;.</p>\n\n<p><strong>Project Implementation Unit - Bridge </strong></p>\n\n<p>6th Floor, Galaxy Backbone Building</p>\n\n<p>1243 Kur Mohammed Ave, Central Business District&nbsp;</p>\n\n<p>900103, Abuja,&nbsp;</p>\n\n<p>FCT Nigeria.</p>\n\n<p>&nbsp;</p>"},{"id":"OP00436900","notice_type":"Request for Expression of Interest","noticedate":"06-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-04-28T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Bhutan","project_id":"P181278","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project","bid_reference_no":"ACCESS/DOST/CS-6/1","bid_description":"Selection of Individual Bridge and Structural Consultant","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Po Box 791, Opposite to Police Building,\nThimphu : Bhutan","contact_ctry_name":"Bhutan","contact_email":"tenzin@moit.gov.bt","contact_name":"Tenzin Tenzin","contact_organization":"Ministry of Infrastructure and Transport","contact_phone_no":"+97577104642","contact_web_url":"https://www.moit.gov.bt","submission_date":"2026-04-06T00:00:00Z","notice_text":"<p><strong>ACCELERATING TRANSPORT AND TRADE CONNECTIVITY IN EASTERN SOUTH ASIA (ACCESS) &ndash; BHUTAN PROJECT</strong></p>\n\n<p><strong>REQUEST FOR EXPRESSION OF INTEREST (REoI) for&nbsp;</strong><strong><u>Hiring Individual</u></strong><strong><u> Bridge and Structural Specialist</u></strong></p>\n\n<p>1. Royal Government of Bhutan has secured the financing from the World Bank towards the cost of the proposed&nbsp;<strong>Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS)-Bhutan Project</strong>, to be implemented partly the Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT) and Government Technology (GovTech) Agency and intends to apply a part of the proceeds of this financing for the services of hiring of Individual International Procurement Expert to be engaged with Project Management Unit, Department of Surface Transport.</p>\n\n<p><strong>2. Scope of Services</strong></p>\n\n<p>&nbsp; &nbsp; &nbsp; &nbsp; The Individual Bridge and Structural Specialist carry out the following activities as per the Terms of Reference, but not limited to:</p>\n\n<ul>\n\t<li>Act as the Employer&rsquo;s independent technical expert to review, challenge (if necessary), and advise on complex bridge designs prepared by the Design Consultant, with particular emphasis on safety, structural integrity, constructability, durability, and long‑term performance;</li>\n\t<li>Ensure that bridge and retaining structure designs adequately address Bhutan‑specific risks and constraints, including seismicity, hydrology, flood and scour hazards, climate change impacts, geotechnical conditions, and environmental considerations, and are consistent with applicable national and international standards;</li>\n\t<li>Support informed and timely Employer decision‑making on design acceptance, optimization, and risk mitigation, including through value engineering and life‑cycle cost considerations; and</li>\n\t<li>Strengthen DoST&rsquo;s institutional capacity for bridge design review, acceptance, and construction‑phase technical oversight through close engagement, knowledge transfer, and hands‑on technical mentoring.</li>\n\t<li>Certify the adequacy and safety of the bridge designs before construction.</li>\n\t<li>The Specialist&rsquo;s inputs will directly inform the Employer&rsquo;s technical approvals, risk management decisions, and quality assurance processes for major bridge works implemented under the ACCESS Bhutan Project.</li>\n</ul>\n\n<p><strong>3. Duration of services and Reporting </strong></p>\n\n<p>The consultant will be selected for 3 years on a retainer basis with the contract for intermittent input of 40-person days per year and to be renewed for each year based on the need of the Project and performance of the Consultant.</p>\n\n<p><strong>4. Selection Procedures</strong></p>\n\n<p>Selection of the consultant will be carried out in accordance with the approved selection methods for Individual Consultants as stated in the &ldquo;World Bank&rsquo;s Procurement Regulations for IPF Borrowers, September 2023.</p>\n\n<p>The selection criteria are:</p>\n\n<p><strong>Education</strong></p>\n\n<ul>\n\t<li>Graduate degree in Civil Engineering;</li>\n\t<li>Postgraduate qualification (Master&rsquo;s degree or equivalent) in Bridge Engineering, Structural Engineering, or a closely related field.</li>\n</ul>\n\n<p><strong>Experience</strong></p>\n\n<ul>\n\t<li>Minimum 15 years of professional experience in bridge and structural engineering, with substantial involvement in the design of major bridge structures;</li>\n\t<li>Demonstrated hands‑on experience in the design of major bridges of similar scale and complexity, including long‑span bridges and bridges in challenging hydraulic, geotechnical, and environmental conditions;</li>\n\t<li>Proven experience with long‑span bridges, including individual bridges longer than 500 m or cumulative bridge experience exceeding 1,500 m, as a lead designer;</li>\n\t<li>Experience with prestressed concrete, box girder, balanced cantilever, or similar bridge systems;</li>\n\t<li>Experience in bridge projects located in seismic and/or monsoon‑affected regions, including incorporation or review of seismic detailing, scour protection, and climate‑resilience measures;</li>\n\t<li>Experience of long-span (over 1000 meters) bridge design and construction of similar hilly terrain comparable to Bhutan.</li>\n\t<li>Experience providing technical support during construction or construction supervision.</li>\n</ul>\n\n<ul>\n\t<li>Proven ability to review and interpret advanced structural analysis and design models prepared using industry-standard bridge and finite element analysis software;</li>\n\t<li>Proven ability to use structural analysis and design models, including finite‑element models, prepared using industry‑standard bridge and structural engineering software (such as MIDAS Civil, CSI Bridge, RM Bridge, SAP2000, STAAD Pro, ANSYS, or equivalent).</li>\n</ul>\n\n<ul>\n\t<li>Strong understanding of bridge life-cycle performance, durability, and maintenance considerations.</li>\n</ul>\n\n<p>Applicants are required to submit their Expressions of Interest (EOI), comprising of a CV (including employment history with duties and responsibilities) and a forwarding letter describing briefly the reasons that the applicant considers him/her-self best suited to perform the assignment.</p>\n\n<p><strong>5</strong>. The attention of interested Consultants is drawn to paragraphs 3.13, 3.15, and 3.16 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers, September 2023&rdquo; (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p><strong>6.</strong> Detailed Terms of Reference (TOR) and other information will be available upon request from the address provided below either through email or in person. TOR is also available in&nbsp;www. moit.gov.bt.</p>\n\n<p><strong>7.</strong> The consultant will be selected following the Selection of Individual Consultant method of the World Bank Procurement Regulations.</p>\n\n<p><strong>8.</strong> Expression of Interest needs to be submitted (either through e-mail or in person or by mail) to the following address by <strong>1400 hours (Bhutan Time, GMT +06 hours)</strong> on or before <strong>April 28, 2026</strong>.&nbsp; Please clearly mention &ldquo;Expression of Interest (EOI) for Selection of Individual Bridge and Structural Specialist in the e-mail&rsquo;s subject line or on the top of the envelope.</p>\n\n<p><strong>9.</strong> The authority reserves the right to accept or reject any or all EOIs without assigning any reason, whatsoever.</p>\n\n<p><strong>10.</strong> For any clarifications contact following during office hours;</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Dechen Norbu, Procurement Specialist at <u>dechennorbu@moit.gov.bt</u></p>"},{"id":"OP00436662","notice_type":"Contract Award","noticedate":"04-Apr-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nigeria","project_id":"P175237","project_name":"Agro-Climatic Resilience in Semi-Arid Landscapes (ACReSAL)","bid_reference_no":"NG-KOGI STATE ACRESAL-491417-GO-RFB","bid_description":"Procurement of Seedlings for Reforestation/ Community landscape led restoration of 10,000 hectares of degraded land through shelter belts, Riparian, Agro-forestry/forest restoration; improved Rice seedlings, Maize and Cassava stems in Kogi State.","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-04-04T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P175237-Agro-Climatic Resilience in Semi-Arid Landscapes (ACReSAL)<br/><b>Loan/Credit/TF Info:</b>IDA-70150<br/><b>Bid/Contract Reference No:</b>NG-KOGI STATE ACRESAL-491417-GO-RFB<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Lot 1: Procurement of Seedlings for Reforestation/Community Landscape led Restoration of 10,000 Ha of degraded Forest and FAO activities in Central Senatorial Zone.</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2025/08/25<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>5 Week(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>AGRO PRECISO (1075300)</b><br/>Suite 410, Nawa Complex, Jahi, Abuja.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 148964980.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NGN 148964980.00</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>AGRO PRECISO (1075300)</b><br/>Form Date: 28-AUG-25<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Ataguba Enemaku Hilary</td><td>NG</td><td>Nigeria</td><td>Directly or indirectly holding 25 % or more of the Voting Rights</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>GREENWATCH INITIATIVE (1075304)</b><br/>Ashby Plaza, 7 New Bridge Road, Wurukum, Markurdi, Benue State.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 139079600.00</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SOCAEB ENTERPRISES (1075307)</b><br/>No. 745, Michael Olobayo Housing Estate, Ganaja Road, Lokoja.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Non-compliance<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MAIGIDA (RIO) & SONS (1075308)</b><br/>Opposite Alh. Salami Ohuohu Compound, Idoji Street, Okene.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Bid Security not Provided<br/></div></br></div><br/></div></div>"},{"id":"OP00435866","notice_type":"Request for Expression of Interest","noticedate":"31-Mar-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-04-27T00:00:00Z","submission_deadline_time":"23:45","project_ctry_name":"Nigeria","project_id":"P182128","project_name":"Nigeria Infrastructure Finance and Guarantee Platform","bid_reference_no":"NG-NSIA-541014-CS-QCBS","bid_description":"Engagement of a Consultant for the Design of a Unified Operating System and Standard Operating Procedures (SOP) for NSIA on behalf of NIFG","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"procurement@nsia.com.ng","contact_ctry_name":"Nigeria","contact_email":"adurosawo@nsia.com.ng","contact_name":"Abraham Durosawo","contact_organization":"Nigeria Sovereign Investment Authority","contact_phone_no":"'08061688723","contact_web_url":"www.nsia.com.ng/procurements","submission_date":"2026-03-31T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSION OF INTEREST (REOI) FOR THE </strong><strong>PROVISION OF CONSULTANCY SERVICES FOR THE DESIGN OF A UNIFIED OPERATING SYSTEM AND STANDARD OPERATING PROCEDURES (SOP) FOR THE PROPOSED NIGERIA INFRASTRUCTURE FINANCE AND GUARANTEE (NIFG) GROUP FOR NSIA </strong></p>\n\n<p><strong>PROJECT: NIGERIA INFRASTRUCTURE FINANCE AND GUARANTEE PLATFORM (P182128)</strong></p>\n\n<p><strong>REF NO: NG-NSIA-541014-CS-QCBS</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>1.&nbsp;</strong><strong>About Nigeria Sovereign Investment Authority (NSIA)</strong></p>\n\n<p>The Nigeria Sovereign Investment Authority (NSIA) is an investment institution established by the NSIA (Establishment, Etc.) Act 2011 and co-owned by all the federating units of Nigeria. The Authority was established to achieve three broad mandates, which essentially are to:</p>\n\n<p>(a) build a savings base for the Nigerian people</p>\n\n<p>(b) enhance the development of Nigerian infrastructure, and</p>\n\n<p>(c) provide stabilization support in times of economic stress.</p>\n\n<p>These mandates are to be achieved through the management and investment of three statutorily fixed and ring-fenced funds, via the Nigeria Infrastructure Fund, the Future Generations Fund, and the Stabilization Fund.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>2. Project Overview</strong></p>\n\n<p>The Nigeria Sovereign Investment Authority (NSIA), in partnership with the World Bank Group, is in the process of establishing the proposed Nigeria Infrastructure Finance and Guarantee (NIFG) Group:<strong> </strong>a purpose-built, full-stack de-risking platform that moves infrastructure projects through an integrated conveyor belt of bankability under a consolidated Group structure.</p>\n\n<p>To mobilize private capital at scale, the NIFG Group functions through four distinct but interlinked institutional Facilities:</p>\n\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp;i. Project Preparation Facility (PPF) &ndash; The &quot;Factory&quot;: </strong>Revolving fund dedicated to financing pre-investment activities to ensure project bankability.</p>\n\n<p><strong>&nbsp; &nbsp; &nbsp; ii. Viability Gap Fund (VGF) &ndash; The &quot;Bridge&quot;</strong><strong>: </strong>Specialized entity designed to bridge the affordability gap for priority social projects.</p>\n\n<p><strong>&nbsp; &nbsp; &nbsp; iii. Risk Capital Facility (RCF) &ndash; The &quot;Investor&quot;:</strong> Catalytic, risk-tolerant arm providing anchor equity, quasi-equity and first loss capital.</p>\n\n<p><strong>&nbsp; &nbsp; &nbsp;iv. Credit Guarantee Vehicle (CGV) &ndash; The &quot;Guarantor&quot;: </strong>Final link.<strong> </strong>Provides a comprehensive suite of credit enhancement products to de-risk senior debt.</p>\n\n<p>To transition from strategy to implementation, the NSIA seeks a highly experienced firm (&quot;The Consultant&quot;) to design the Group&rsquo;s Unified Operating System - a comprehensive suite of Standard Operating Procedures (SOPs) that governs the lifecycle of infrastructure interventions across each of the four ring-fenced but interlinked NIFG subsidiaries.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>3. Scope of Services</strong></p>\n\n<p>The scope of services includes but is not limited to:</p>\n\n<ul>\n\t<li>Establish Group-Wide Governance and Control: Create a cohesive operational architecture where data, decisions, and projects flow seamlessly across the four Facilities.</li>\n\t<li>Develop Facility-Specific SOPs: Draft detailed operational manuals for each Facility.</li>\n\t<li>Design the Unified Deal Flow: Define the inter-Facility eligibility gateways, hand-off protocols, and information-sharing mechanisms that allow a project to move through the NIFG conveyor belt.</li>\n\t<li>Develop Standardized Reporting Templates and Protocols: Develop consistent reporting templates and performance monitoring protocols for internal and external stakeholders.</li>\n\t<li>Benchmark against Global Best Practice: Validate the resulting control framework against comparable Development Finance Institutions (DFI) operating models.</li>\n</ul>\n\n<p>Detailed Terms of Reference (ToR) will be provided to shortlisted firms at the Request for Proposal (RFP) stage.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>4. Eligibility Requirements</strong></p>\n\n<p>Interested consulting firms must meet the following minimum eligibility requirements to be considered:</p>\n\n<ul>\n\t<li>Demonstrated experience in the design and implementation of operating models, governance frameworks, and standard operating procedures for DFIs, infrastructure funds, guarantee institutions, or other complex financial platforms.</li>\n\t<li>Proven institutional capacity for the development of unified operating systems and facility‑specific SOPs across multi‑entity or multi‑facility platforms.</li>\n\t<li>Evidence of experience in governance, risk management, and fiduciary control frameworks, including familiarity with requirements applicable to World Bank Group supported or donor‑funded projects.</li>\n\t<li>Demonstrated understanding of the Nigerian institutional, regulatory, and infrastructure financing context, including familiarity with public‑sector governance environments, the World Bank Group&#39;s Environmental and Social Framework (ESF) and international good practices.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>5. Registration and Submission Guidelines</strong></p>\n\n<p>Interested firms must be duly registered on the <strong>NSIA Procurement Vendor Management System (PVMS).</strong></p>\n\n<ul>\n\t<li>Firms that are already registered on the PVMS should ensure that their profiles and supporting documents are up to date.</li>\n\t<li>New firms are required to register on the PVMS via <strong>[pvms@nsia.com.ng].</strong><br />\n\tAll due diligence and eligibility reviews will be conducted through the PVMS platform.</li>\n\t<li>EOIs must be submitted electronically via PVMS as a PDF clearly marked:</li>\n</ul>\n\n<p>&ldquo;EXPRESSION OF INTEREST (EOI) FOR THE PROVISION OF CONSULTANCY SERVICES FOR THE DESIGN OF A UNIFIED OPERATING SYSTEM AND STANDARD OPERATING PROCEDURES (SOP) FOR THE PROPOSED NIGERIA INFRASTRUCTURE FINANCE AND GUARANTEE (NIFG) GROUP FOR NSIA&rdquo;<br />\nREF NO: NG-NSIA-541014-CS-QCBS</p>\n\n<ul>\n\t<li>The submission deadline is <strong>23:45 hours (WAT) on Monday, April 27, 2026.</strong> Late submissions will not be accepted.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Interested firms that meet the eligibility requirements are required to submit the following information and documentation as part of their Expression of Interest:</p>\n\n<ul>\n\t<li>A company profile outlining relevant expertise and experience;</li>\n\t<li>A summary of similar assignments executed in the past ten (10) years and;</li>\n\t<li>Confirmation of interest and availability to undertake the assignment.</li>\n\t<li>Where an Expression of Interest is submitted by a Joint Venture (JV) or association, firms must clearly indicate the composition of the JV, nominate a lead firm, and outline the roles of each participating firm.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>6. Important Notices</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp; &nbsp; i. Conflict of Interest</strong></p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank Group&#39;s Procurement Regulations for Investment Project Financing (IPF) Borrowers, Seventh Edition, September 2025 (&ldquo;Procurement Regulations&rdquo;), which set forth the World Bank Group&rsquo;s policy on Conflict of Interest.</p>\n\n<p>Consultants shall ensure that they, their affiliates, or their personnel do not have any actual, potential, or perceived conflict of interest as defined under the Procurement Regulations.</p>\n\n<p>No additional conflict‑of‑interest requirements specific to this assignment have been identified at this stage.</p>\n\n<p><strong>&nbsp; &nbsp; ii. Associations / Joint Venture</strong></p>\n\n<p>Consultants may associate with other firms to enhance their qualifications and expertise but must clearly indicate whether the association is in the form of a joint venture and/or a sub‑consultancy. In the case of a joint venture, all partners shall be jointly and severally liable for the entire contract, if selected, and the joint venture shall nominate a lead firm authorised to act on behalf of the association.</p>\n\n<p><strong>&nbsp; &nbsp; iii. Selection Method</strong></p>\n\n<p>A Consultant will be selected in accordance with the Quality‑ and Cost‑Based Selection (QCBS) method, as set out in the World Bank Group&#39;s Procurement Regulations.</p>\n\n<p><strong>&nbsp; &nbsp; iv. Key Experts</strong></p>\n\n<p>Key Experts will <strong>NOT</strong> be evaluated at the EOI stage. At the Request for Proposals (RFP) stage, the shortlisted firms will be required to propose suitably qualified and experienced Key Experts with relevant professional qualifications and experience appropriate to the assignment. Membership of recognised international or national professional bodies will be considered an added advantage.</p>\n\n<p><strong>&nbsp; &nbsp; v. Further Information</strong></p>\n\n<p>Further information may be obtained from the NSIA Procurement Unit via email through: <strong>procurement@nsia.com.ng</strong> during official working hours <strong>08:00 to 17:00 (WAT)</strong></p>\n\n<p><strong>&nbsp; &nbsp; vi. Disclaimers</strong></p>\n\n<ul>\n\t<li>Only shortlisted firms will be invited to the next stage of the procurement process;</li>\n\t<li>NSIA reserves the right to verify all claims and to reject submissions at any stage if false information is detected;</li>\n\t<li>This invitation does not constitute a commitment on the part of NSIA to award any contract; and</li>\n\t<li>NSIA shall not be responsible for any costs incurred in connection with the submission of EOIs.</li>\n</ul>\n\n<p><strong>Signed:</strong><br />\n<strong>Nigeria Sovereign Investment Authority (NSIA)</strong></p>"},{"id":"OP00424924","notice_type":"Contract Award","noticedate":"04-Feb-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nigeria","project_id":"P167183","project_name":"Nigeria Digital Identification for Development Project","bid_reference_no":"NG-ID4D-PIU-24-24","bid_description":"Procurement of Work tools - Second Phase (PIU, NIMC Technical Team, GRM Focal Persons, Corporate Communications and Security)","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","submission_date":"2026-02-04T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P167183-Nigeria Digital Identification for Development Project<br/><b>Loan/Credit/TF Info:</b>IDA-65270<br/><b>Bid/Contract Reference No:</b>NG-ID4D-PIU-24-24<br/><b>Procurement Method:</b>RFB-Request for Bids<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Contract for the Procurement of Work Tools - Second Phase 2- Lot 2: Procurement of 692 Laptops</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2025/11/24<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>28 Day(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>JETLINK LIMITED (1018898)</b><br/>Plot 18, 115, Lekki Phase 1, Eti-Osa, LGA, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 1068069303.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NGN 1068069303.00</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>BAUBE SOLUTIONS NIG.LTD (1018879)</b><br/>SCCN HOUSE PLOT 184, ADETOKUNBO ADEMOLA CRESCENT, WUSE II, ABUJA<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 1412378000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ARIT OF AFRICA LIMITED (1016598)</b><br/>354, Muritala Mohammed way Yaba, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 1636957161.86</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>FEMONI INTERNATIONAL LTD (1018885)</b><br/>149, Ogudu Road, Ojota, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 570825000.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>MILLENIUM TECHNICAL NIG. LTD (1018882)</b><br/>10 Tokunboh Alli Street, Off Toyin Street, Ikeja, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 1157959749.50</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>PRUNEDGE DEVELOPMENT TECHNOLOGIES LTD. (905937)</b><br/>7 Omo Ighodalo Street, Ogudu, GRA, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN 1137350000.00</div></br></div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>INFOTECH BRIDGES LTD (842019)</b><br/>Hall A & B Poly Plaza, Beside AP plaza Ademola Adetokunbo Crescent, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>STONEMILL NIGERIA LIMITED (859584)</b><br/>Plot 1121, Oladipo Diya Road, Sector Center P Turbo Energy Building, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>RSA GLOBAL INVESTMENT LTD (1018877)</b><br/>No. 30b, Sudan Street, Wuse Zone 6, Abuja, FCT<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>JTS-ICT INTEGRATED SERVICES LIMITED (1018899)</b><br/>Suite 410B, Nawa Complex, Jahi District, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SKYTECH SOLAR & ENERGY SERVICES LTD (1018878)</b><br/>Zone 5, 22 Sokode Cres, Wuse, Abuja, FCT<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>RANDA FRAMES ENGINEERING LTD (1018889)</b><br/>Gidan Nasir Ahmed. 3 Zaria Road, Kano State<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DIGITAL COMMUNICATIONS KONSULT NIGERIA LIMITED (1018897)</b><br/>149, Ogudu Road, Ojota, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>CEDARJASPES CONCEPTS LIMITED (1018896)</b><br/>5, Airiohuodion Street, Off Aduramigba Wigha Bridge, Owode-Onirin, Ikorodu, Lagos<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>HOMPHAD ENGINEERING LIMITED (1018893)</b><br/>Plot 9, Block E, Durosaro L/out, Ponpola, Gbekuba, Apata, Ibadan, Oyo State<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ANDALEX INTEGRATED SERVICES LIMITED (1018883)</b><br/>No 9 Kaltungo Street, Garki, Abuja<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>BEIJING EASTWEST ENERGY TECHNOLOGY LTD (1018880)</b><br/>Zhongbiao Plaza, No. 51, Tiantong Zhongyuan, Changping District, Beijing, 102218<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN<br/><br/>Evaluated Bid Price<br/>NGN<br/><br/>Reason for Rejection<br/>Does not meet Eligibility Requirements<br/></div></br></div><br/></div></div>"},{"id":"OP00424044","notice_type":"Request for Expression of Interest","noticedate":"02-Feb-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-02-13T00:00:00Z","submission_deadline_time":"17:30","project_ctry_name":"Ethiopia","project_id":"P179040","project_name":"Ethiopia Digital ID for Inclusion and Services Project","bid_reference_no":"ET-NIDP-524662-CS-INDV","bid_description":"Selection of Fayda Pass Product Owner","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Bole Wolo Sefer Ethio-China Street Addis Ababa, Ethiopia","contact_ctry_name":"Ethiopia","contact_email":"mesfin@id.gov.et","contact_name":"Mesfin Belachew","contact_organization":"Prime Minster Office, National ID Program","contact_phone_no":"0911791462","contact_web_url":"https://id.gov.et/","submission_date":"2026-02-02T00:00:00Z","notice_text":"<p><strong>Request for Expression of Interest</strong></p>\n\n<p><strong>(Consulting Services &ndash; Individual Selection)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Fayda Pass Owner for the National ID Program &nbsp;</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Country:&nbsp;</strong><strong>Ethiopia</strong></p>\n\n<p><strong>Project:&nbsp;</strong><strong>Ethiopia Digital ID for Inclusion and Services Project</strong></p>\n\n<p><strong>Project ID:&nbsp;</strong><strong>P179040</strong></p>\n\n<p><strong>Assignment Title:&nbsp;</strong>&nbsp;<strong>Fayda Pass Owner for the National ID Program</strong></p>\n\n<p><strong>Reference No.:&nbsp;ET-NIDP-524662-CS-INDV</strong></p>\n\n<p><strong>Duty Station: NIDP Head Office, Addis Ababa</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Federal Democratic Republic of Ethiopia, Ministry of Finance (MoF), has received financing from the World Bank toward the cost of the Ethiopia Digital ID for Inclusion and Services Project.&nbsp; National ID Program, the ultimate project implementer intends to apply part of the proceeds for selecting of individual consultants.</p>\n\n<p>National ID Program as part of the project implementation program is looking Fayda Pass Owner that supports the NIDP. &nbsp;Experienced experts who have experience, passionate and innovative ideas for the position are invited to express their interest for the assignment.</p>\n\n<p><strong>The</strong> <strong>Fayda Pass Owner </strong>will play a crucial role in supporting Senior Product Owner and the overall services for the National ID Program in Ethiopia. You will collaborate closely with cross-functional teams, including software engineers, designers, data analysts, and government stakeholders to deliver high-quality and user-centric solutions.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>The Fayda Pass Owner</strong> acts as the strategic architect and orchestrator of the trust ecosystem, bridging the gap between complex cryptographic infrastructure and seamless service delivery for Holders, Issuers, and Verifiers. S/he is responsible for ensuring key service and integration components are productized. This includes the technical integration layer such as the PKI-driven tools and SDKs to be deployed (reused) within partner environments (issuers as well as verifiers). The product environment must ensure that sensitive credentials like Digital IDs and Financial Accounts are issued securely via HSMs and verified instantly across the platform. Ultimately, the role is to balance rigorous regulatory compliance and security with a frictionless user experience, transforming a complex decentralized credential ecosystem into a scalable, interoperable, and daily-use framework and utility.</p>\n\n<p>Specific responsibilities for the<strong> Fayda Pass Owner </strong>will include, but are not limited to, the following core activities:&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Translate complex cryptographic requirements (like PKI certificate lifecycles and mTLS handshakes) into seamless business workflows for NIDP&rsquo;s institutional partners.</li>\n\t<li>Make-sure that integration partner services have a smooth and simple as possible utilizing the current toolkit (Lightweight Org Agent), making it a repeatable, self-service experience that reduces the time-to-market for new partners (e.g., getting a new Bank live in a few days instead of weeks).</li>\n\t<li>Ensure that the platform and service remains the &quot;Gold Standard&quot; for compliance, ensuring our credentials are accepted throughout the country and across borders. Closely following evolving global standards such W3C, eIDAS, ISO, DIDComm, OIDC4* and other important to the platform.</li>\n\t<li>Maintain the brand integrity of Fayda Pass as the custodian of the platform&rsquo;s security posture, managing the roadmap for key rotation, revocation registries, and data privacy features.</li>\n\t<li>Comfortably manage the variation in the two extremes (the technical depth and the user experience). There are instances where the product owner may be discussing Hardware Security Modules (HSMs) in the morning and End-User UX in the afternoon.</li>\n\t<li>Ensure the &quot;Trust Triangle&quot; functions seamlessly as a decentralized but unified ecosystem:</li>\n</ul>\n\n<ul>\n\t<li>(For the Issuer) - manage the APIs and SDKs that allow the issuer organization to securely publish credentials into the wallet.</li>\n\t<li>(For the Holder / End-User) - oversee the mobile/web interface where users store, manage, and share their data with privacy-preserving features (like Zero-Knowledge Proofs).</li>\n\t<li>(For the Verifier<strong>) -</strong> manage the verification gateways that allow third parties (like a border agent) to instantly validate a credential without seeing unnecessary private data.</li>\n</ul>\n\n<ul>\n\t<li>Take responsibility for the roadmap that takes the wallet from a simple credential storage tool to a daily utility. This Includes the following key aspects:\n\t<ul>\n\t\t<li>Onboarding: Designing frictionless flows for users to claim their first ID or link a bank account.</li>\n\t\t<li>Expansion: Identifying new use cases (e.g., adding &quot;Academic Document&quot; or &quot;Health Record&quot; credentials).</li>\n\t\t<li>Monetization: <strong>suggesting </strong>a reasonable cost-per-verification or subscription model for enterprise Verifiers.</li>\n\t\t<li>Reliability: Monitoring platform uptime and the performance of the underlying data and trust chain.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>National ID Program, Digital ID for Inclusion and Services Project now invites eligible Individual Experts to indicate their interest to provide the Services. Interested Experts should provide information demonstrating that they have the required qualifications and relevant experience to perform the services for a period of one year with possibility of extension for additional period subject to outstanding performance of the consultant and availability of budget. The shortlisting criteria include the following;</p>\n\n<p>The ideal candidate for the role of <strong>Fayda Pass Owner </strong>will bring the following competencies and skills:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Bachelor&rsquo;s or Master&rsquo;s degree in Computer Science, Information Security, Software Engineering, or a related field.</li>\n\t<li>Minimum of 5+ years in Product Management or Technical Project Management, with a proven track record of defining, launching, and scaling complex digital services.</li>\n\t<li>Experience managing product oriented projects such as enterprise software systems that involve multiple external stakeholders (e.g., B2B2C models).</li>\n\t<li>Proficiency in translating high-level policy goals or business objectives into a phased technical backlog and a 12-month product vision.</li>\n\t<li>Ability to manage a &quot;multi-sided market&quot; (such as Issuers, Holders, and Verifiers in the case of Wallets), balancing the conflicting needs of institutional partners with the ease of use for citizens.</li>\n\t<li>Experience in &quot;productizing&quot; technical tools, specifically overseeing the delivery of APIs, SDKs, or on premise connectors that allow external partners to integrate with a central platform efficiently.</li>\n\t<li>A solid understanding of secure system design, including identity management (IAM), data encryption, and &quot;Privacy-by-Design&quot; principles.</li>\n\t<li>Ability to act as a bridge between high-level institutional partners and deep-tier engineering teams, translating complex requirements into seamless business workflows.</li>\n\t<li>Experience collaborating with UI/UX teams to simplify high-security actions (such as digital signing or identity recovery) into intuitive, frictionless experiences for the general public.</li>\n\t<li>General familiarity with (or a strong appetite to learn) global standards such as W3C Verifiable Credentials, ISO standards, and regional data protection frameworks.</li>\n\t<li>Strong grasp of the full agile SDLC, including requirements gathering, user stories, and managing large-scale User Acceptance Testing (UAT).</li>\n\t<li>Ability to collaborate with designers to make complex security actions (like key recovery or biometric signing) feel intuitive and frictionless for the everyday citizen.</li>\n\t<li>Entrepreneurial skills with a proactive approach to identifying new use cases (Education, Health, Finance) to increase the platform&#39;s utility and daily adoption.</li>\n</ul>\n\n<p>The selection method is based on para 7.36 and 7.37 of the World Bank&rsquo;s Procurement Regulation.</p>\n\n<p>The attention of interested individual is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; 6th edition Revised February 2025 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>An individual will be selected in accordance with the Selection of Individual Consultant (Section V) method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest (CV, cover letter and documentary evidence for fulfilling the qualifications) must be delivered in a written form to the address below by E-mail on or before February 13th, 2026. Further information can be obtained, by email at the below address during office hours from 8:30 AM to 5:30 PM Addis Ababa time:&nbsp;</p>\n\n<p><strong>Federal Democratic Republic of Ethiopia,</strong></p>\n\n<p><strong>National ID Program (NIDP)</strong></p>\n\n<p><strong>Digital ID for Inclusion and Services Project</strong></p>\n\n<p><strong>Attn: Project Management Unit (PMU),</strong></p>\n\n<p><strong>Address: Welosefer Bole, Ethio-China St, INSA Building, 15th Floor, Addis Ababa, Ethiopia</strong></p>\n\n<p><strong>Tele- +251-911-446582 or +251-912-200295</strong></p>\n\n<p><strong>E-mail: </strong><strong>zelalem@id.gov.et</strong><strong> or nejmedin@id.et</strong></p>\n\n<p><strong>Website: https://id.gov.et/</strong></p>\n\n<p><strong><u>Addis Ababa, Ethiopia</u></strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00415987","notice_type":"Request for Expression of Interest","noticedate":"23-Dec-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-01-16T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Liberia","project_id":"P171997","project_name":"Liberia Investment, Finance and Trade Project","bid_reference_no":"LR-MOCI-524265-CS-CQS","bid_description":"Consulting Services to Conduct Demand Assessment of the Monrovia Industrial Freezone for the Liberia Special Economic Zones Authority.","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Ministerial Complex\nCongo Town\nTubman Blvd, Monrovia,","contact_ctry_name":"Liberia","contact_email":"jsayekehnel@gmail.com","contact_name":"Julius  Saye-Kehnel","contact_organization":"Ministry of Commerce and Industry","contact_phone_no":"0777201863","submission_date":"2025-12-23T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong><strong>REPUBLIC OF LIBERIA<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;MINISTRY OF COMMERCE &amp; INDUSTRY (MoCI)</strong><br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;Liberia Investment, Finance &amp; Trade Project (LIFT-P)</p>\n\n<p>INSURANCE BUILDING, 5TH STREET-SINKOR, OPPOSITE CONEX GAS STATION</p>\n\n<p>MONROVIA, LIBERIA<br />\nP.O. Box 9041, 1000 Monrovia, 10 Liberia<br />\nEmail: info-lift@moci.gov.lr /www.moci.gov.lr</p>\n\n<p><strong>REQUEST FOR EXPRESSION OF INTEREST (REOI)</strong><br />\n<strong>(CONSULTING SERVICES &ndash; FIRM SELECTION)</strong></p>\n\n<p>Liberia Investment, Finance and Trade Project (LIFT-P)<br />\nProject ID: P171997<br />\nCredit Number 7037-LR<br />\nGrant Number D9690-LR<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; </strong></p>\n\n<p><strong>December 15, 2025</strong></p>\n\n<p><strong>Consulting Services to Conduct Demand Assessment of the Monrovia</strong> <strong>Industrial Freezone for the Liberia Special Economic Zones Authority </strong></p>\n\n<p><strong>REF. No:&nbsp; LR-MOCI-524265-CS-CQS</strong></p>\n\n<p>The Republic of Liberia through the Ministry of Commerce &amp; Industry has received financing from the International Development Association (IDA)/ World Bank towards the cost of implementing the Liberia Investment, Trade &amp; Finance Project (LIFT-P).</p>\n\n<p><strong>Key Objectives of the Assignment &nbsp;</strong></p>\n\n<p>This assessment aims to bridge the gap between existing supply and actual market demand by identifying key deficiencies in services, products, and infrastructure. Through stakeholder engagement and data-driven insights, it will provide actionable recommendations to enhance the market contestability, service quality, availability, and responsiveness. The findings will support strategic policy decisions, infrastructure development, and investment opportunities, particularly in industrial zones, ensuring that services align with user expectations and contribute to sustainable economic growth.</p>\n\n<p>The objectives of the assignment are to:</p>\n\n<ol>\n\t<li>Determine the existing gaps between the current supply (e.g., services, products, infrastructure, industrial land) and the actual demand of the target population.</li>\n\t<li>Identify and engage industries with high market demands suitable for the Free Zone and other stakeholders (e.g., communities, businesses, government, etc) to clarify their priorities, and preferences.</li>\n\t<li>Provide a framework to improve the quality, availability, and efficiency of services/products to align with user expectations and increase market contestability. The framework shall include policy incentives for sustainable zone operations, including environmental and social safeguard incentives for zone planning, ensuring compliance with Liberian laws and best international standards.</li>\n\t<li>Provide data-driven insights to guide policy-making, program initiatives, and export-oriented investments that offer opportunities and job creation in industrial and free zones</li>\n</ol>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment can found at the link below: </strong>hppt //: www.moci.gov.lr&nbsp; / www.emansion.gov.lr&nbsp;</p>\n\n<p>The Ministry of Commerce and Industry now invites eligible Consulting Firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are listed as per the Terms of Reference provided below.</p>\n\n<p>The Consulting Firm should have a minimum qualifications and experience as follows:</p>\n\n<ul>\n\t<li>The firm should be able to demonstrate extensive experience and successful delivery of measurable zones demand assessments in sub-Saharan Africa working with both public and private sector stakeholders.</li>\n\t<li>At least Ten (10) years of relevant experience in demand assessment.</li>\n\t<li>Details of similar assignments undertaken during the last five (5) years.</li>\n\t<li>For each assignment presented, the bidder must, where possible, identify the client involved and provide a brief description of the services delivered to the client.</li>\n</ul>\n\n<p><strong>Key Experts will not be evaluated at the shortlisting stage.</strong></p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers dated July 2016, Revised November 2017, August 2018, November 2020, September 2023, February 2025 and September 2025 &nbsp;(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>The Consultant will be selected in accordance with the Consultant Qualification Selection (CQS) method set out in the Procurement Regulations for IPF Borrowers (July 2016 as Revised in November 2017, August 2018, November 2020, September 2023, February 2025 and September 2025).</p>\n\n<p>Further information can be obtained at the address below during office hours, i.e., 0900 to 1600 hours GMT, Monday to Friday.</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by<br />\nmail, or by fax, or by e-mail) on or before <strong>Friday January 16, 2026, </strong>with subject:</p>\n\n<p><strong>&ldquo;Re: Consulting Services to Conduct Demand Assessment of the Monrovia</strong> <strong>Industrial Freezone for the Liberia Special Economic Zones Authority &rdquo;.</strong></p>\n\n<p>Liberia Investment, Finance and Trade Project (LIFT-P)<br />\nAttn: Julius Y. Saye Keh-nel &nbsp;<br />\nActing Project Coordinator<br />\nInsurance Building, 5th Street, Sinkor &nbsp;<br />\nMonrovia, Liberia<br />\nTel: +231 88 682 2025 /776 654 713<br />\nEmail: <em>jsayekehnel-lift@moci.gov.lr</em><br />\nCc: <em>/</em><em>vanyanbah.julius@yahoo.com</em> /<em>fahnco76@yahoo.com</em>&nbsp;</p>\n\n<p><strong>Terms of Reference </strong></p>\n\n<p>Consulting Services to Conduct Demand Assessment of the Monrovia Industrial Freezone for the Liberia Special Economic Zones Authority</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Post Title:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:414px\">\n\t\t\t<p>Firm for Zone Demand Assessment&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:none; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Location of Post:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:none; vertical-align:top; width:414px\">\n\t\t\t<p>Headquarters of the Liberia Special Economic Zone Authority (LSEZA), Monrovia, Liberia</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Contract Duration:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:414px\">\n\t\t\t<p>4 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Reporting Line:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:414px\">\n\t\t\t<p>Executive Chairman of the LSEZA, through the LIFT PIU</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Recruitment Type:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:414px\">\n\t\t\t<p>Local and International</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:208px\">\n\t\t\t<p><strong>Type of Contract</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:414px\">\n\t\t\t<p>Firm Selection</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li>BACKGROUND</li>\n</ol>\n\n<p>The Government of Liberia has established the Liberia Special Economic Zone Authority (LSEZA) and appointed its Executive Chairman and members of the Board of Directors, consistent with the 2017 Special Economic Zones Act. The LSEZA is mandated to designate and regulate special zones for economic activities, including guiding the activities of zones and industrial parks.<strong> </strong>As part of its activities for 2025, the Authority has identified the development and improvement of the Monrovia Free Zone to attract investments that will create jobs and increase revenue for the Government. The first step to this is to conduct demand assessment of the Free Zone.</p>\n\n<p>To support private sector development, the Government is determined to continue with the implementation of its new spatial strategy to accelerate large and potentially transformative private sector investments. This approach is focused on new growth corridors, industrial parks, and special economic zones, which will allow for better coordination within government and with the private sector. Liberia&#39;s investment climate presents both opportunities and challenges. The country has significant natural resources, including mining, agriculture, and forestry, which offer potential for investment. Liberia economic growth has been driven by mining, construction, and service industries; an opportunity which has pressured the government to prioritize and promote private sector development as the lynchpin for job creation and economic growth. &nbsp;&nbsp;</p>\n\n<p>All of these efforts will require building an enabling environment for a robust investment climate. The Liberia Investment, Finance and Trade Project (LIFT-P) was launched with funding from the Government of Liberia and the World Bank to address these challenges such as weak investment climate that limits investments and trade; limited SME access to markets and finance with the aim to improve the investment climate, expand sustainable access to finance, and increase the efficiency of trade in Liberia.</p>\n\n<p>With support from the LIFT Project, implemented by the Ministry of Commerce and Industry, the LSEZA is seeking to hire the services of a consulting firm with experience in zones demand assessment to conduct an assessment of the Monrovia Freezone. The Freezone is about 93.8 acres in size and is located adjacent the Freeport of Monrovia.</p>\n\n<ol>\n\t<li>ACTIVITY DESCRIPTION</li>\n</ol>\n\n<p>The Liberia Special Economic Zones Authority (LSEZA), is seeking a qualified firm to carry out a comprehensive demand assessment of the Monrovia Freezone for private sector development activities and investment attraction. The demand assessment must align with Liberia&rsquo;s national development plan, the LSEZA Act and policies, the EPA regulations and international best practices, ensuring environmental sustainability, and social inclusivity. The firm will be required to assess the demand for industrial activities while prioritizing sectors with low environmental impact and high social benefits.</p>\n\n<ol>\n\t<li>OBJECTIVES</li>\n</ol>\n\n<p>This assessment aims to bridge the gap between existing supply and actual market demand by identifying key deficiencies in services, products, and infrastructure. Through stakeholder engagement and data-driven insights, it will provide actionable recommendations to enhance the market contestability, service quality, availability, and responsiveness. The findings will support strategic policy decisions, infrastructure development, and investment opportunities, particularly in industrial zones, ensuring that services align with user expectations and contribute to sustainable economic growth.</p>\n\n<p>The objectives of the assignment are to:</p>\n\n<ol>\n\t<li>Determine the existing gaps between the current supply (e.g., services, products, infrastructure, industrial land) and the actual demand of the target population.</li>\n\t<li>Identify and engage industries with high market demands suitable for the Free Zone and other stakeholders (e.g., communities, businesses, government, etc) to clarify their priorities, and preferences.</li>\n\t<li>Provide a framework to improve the quality, availability, and efficiency of services/products to align with user expectations and increase market contestability. The framework shall include policy incentives for sustainable zone operations, including environmental and social safeguard incentives for zone planning, ensuring compliance with Liberian laws and best international standards.</li>\n\t<li>Provide data-driven insights to guide policy-making, program initiatives, and export-oriented investments that offer opportunities and job creation in industrial and free zones</li>\n</ol>\n\n<ol>\n\t<li>SCOPE OF ASSIGNMENT</li>\n</ol>\n\n<p>By leveraging evidence-based insights, the study will support the development of a framework that enhances the quality, availability, and responsiveness of services and products while positioning the Freezone as an attractive investment destination with sectors having low environmental impact and high social benefits. The outcomes will serve as a foundation for effective decision-making, guiding policies, programmes, and investments to drive economic transformation and long-term sustainability.</p>\n\n<ol>\n\t<li><strong>Gap Analysis:</strong> Assess and identify existing disparities between the current supply of services, products, and infrastructure and the actual demand of the target population, including revenue sharing modality based on international best practice. This includes evaluating accessibility, quality, and efficiency issues that may hinder economic or industrial growth.</li>\n\t<li><strong>Stakeholder Engagement:</strong> Conduct consultations with key stakeholders, including potential consumers, local communities, businesses, potential investors and government entities, to understand their priorities, preferences, and challenges. This process will ensure that recommendations are aligned with real-world needs and expectations.</li>\n\t<li><strong>Service and Product Enhancement Framework</strong>: Develop a structured approach to enhance the quality, availability, and responsiveness of services and products. This framework should outline practical strategies to improve efficiency, address gaps, and align offerings with user expectations, as well as environmental and social proposals for sustainable zone operations.</li>\n\t<li><strong>Data-Driven Policy and Investment Guidance:</strong> Generate actionable insights based on quantitative and qualitative data to inform policy decisions, program initiatives, and strategic investments. These insights should focus on maximizing opportunities in industrial zones and fostering sustainable economic development.</li>\n</ol>\n\n<ol>\n\t<li>DEMAND ASSESSMENT&nbsp;</li>\n</ol>\n\n<p>The demand assessment will provide data-driven insights to guide the design, implementation, and management of the Freezone. It will ensure that the Freezone is economically viable, market-responsive, and globally competitive, fostering industrial growth, job creation, and sustainable investment inflows. The findings will serve as a blueprint for government agencies, investors, and development partners in establishing successful and high-impact SEZs in Liberia.</p>\n\n<p>The demand assessment service shall cover the economic potential and viability of transforming the Freezone to attract private sector developers and investors. This will assess the economic viability of the proposed zone by analyzing several key factors:</p>\n\n<ol>\n\t<li>Market Demand Analysis-this involves assessing the current and future demand for industrial, commercial, and logistical activities within the zone. The analysis will consider regional and global market trends, trade flows, and the competitive landscape of similar SEZs in sub-Saharan Africa.</li>\n\t<li>Sectoral Analysis-the assessment will identify high-potential sectors that align with Liberia&rsquo;s economic priorities and global market opportunities, while prioritizing sectors with low environmental impact and high social benefits.</li>\n\t<li>Economic Impact Assessment-the assessment will estimate the potential economic impact of the Freezone, including job creation, GDP contribution, and export growth. This will involve forecasting the economic multiplier effects of private sector investments in the Freezone and possible revenue sharing modality.</li>\n\t<li>Infrastructure and Resource Assessment-the assessment will evaluate the existing infrastructure (e.g., power, water, transportation) and identify gaps that need to be addressed to make the zone operational. It will also assess the availability of natural resources and labor in the vicinity of the zone.</li>\n\t<li>Financial Viability-the assessment will include a cost-benefit analysis to determine the financial viability of developing and operating the zone. This will involve estimating development costs, operational expenses, and potential revenue streams from leasing, taxes, and fees.\n\t<ol>\n\t\t<li>Demand Assessment Methodology</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The assessment is expected to include desk review, field and environmental site visits, stakeholder workshops, and demand modeling. However, the firm shall propose the assessment methodology, justifying the reason for adopting it. The assessment is required to be supported by appropriate documentation setting out the underlying methodology, process, and evidence used to produce the valuation. This needs to be referenced back to the underlying accounting standards and best practices and demonstrate full compliance with all aspects of the prescribed requirements.</p>\n\n<p>Assumptions and calculation basis shall be communicated with LSEZA&rsquo;s management and shall be clearly defined in the report and valuation model.</p>\n\n<p>&nbsp;5.2. The final Assessment Report</p>\n\n<p>The final assessment report shall include the following but not limited to:</p>\n\n<ol>\n\t<li>The signed original report setting out the process results, limitations, qualifications of the valuer, valuation certificate, summary data, etc.;</li>\n\t<li>Assessment shall be based on the open market values as of the date the final report is submitted;</li>\n\t<li>Assessment shall be in line with requirements of international best practice and consistent with Liberian Laws;</li>\n\t<li>Detailed statistics of the Zone land and similar land in the same locality;</li>\n\t<li>Methodology (Detailed workings on the derived values) used for purposes of verification of the reported figures for audit purposes;</li>\n\t<li>The Assessment report should also be provided in PDF/ Word/Excel format listing each component, underlying assumptions, and results with hyperlinked photographs, GIS coordinates, etc. where appropriate. The ability for LSEZA to access the electronic data and use it to upload to other systems is critical.</li>\n</ol>\n\n<ol>\n\t<li>PROVIDE TRAINING TO LSEZA STAFF</li>\n</ol>\n\n<p>The objective of the demand assessment shall be to provide the fundamentals of each approach for demand, together with limitations and caveats on the use of each, as well as extended examples of the application of each. The trainings will focus on equipping the Liberia Special Economic Zones Authority (LSEZA) staff with the necessary skills and knowledge to effectively manage, promote, and sustain the SEZs. The training should be comprehensive, practical, and tailored to the specific needs of the LSEZA, ensuring that staff are well prepared to handle the complexities of SEZ development and management. The training objective is to provide LSEZA staff with a clear understanding of the principles and methodologies used in demand assessment for SEZs and will cover among other topics to be proposed by the firm:</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Overview of demand assessment techniques and tools.</li>\n\t\t<li>Data collection methods (primary and secondary data).</li>\n\t\t<li>Economic modeling and forecasting techniques.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Best practices in SEZ development from international case studies.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Developing a value proposition for each SEZ.</li>\n\t\t<li>Marketing and promotional strategies for SEZs.</li>\n\t\t<li>Investor outreach and engagement techniques.</li>\n\t\t<li>Designing and implementing incentive frameworks (e.g., tax breaks, customs exemptions).</li>\n\t\t<li>Building investor confidence through transparency and good governance.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Cost-benefit analysis for SEZ projects.</li>\n\t\t<li>Revenue generation models (e.g., leasing, taxes, fees).</li>\n\t\t<li>Financial feasibility studies and investment appraisal.</li>\n\t\t<li>Economic impact assessment (e.g., job creation, GDP contribution).</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Addressing gender gaps in access to finance and business opportunities.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Reporting frameworks for SEZ performance.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Stakeholder mapping and engagement strategies, etc.Delivery Mode: The training should be delivered through a combination of workshops, seminars, online courses, and on-the-job training.</li>\n\t</ul>\n\t</li>\n\t<li>Duration: The training program should be spread over the 4-month consultancy period, with regular sessions to ensure continuous learning.</li>\n\t<li>Materials: Training materials should include manuals, case studies, templates, and digital resources for future reference.</li>\n</ul>\n\n<p>These trainings are supposed to be provided by the consulting firm that will ensure that LSEZA staff are well equipped to manage the Freezone effectively, attract investors, and contribute to Liberia&rsquo;s economic growth and development</p>\n\n<ol>\n\t<li>TEAM EXPERTISE\n\t<ol>\n\t\t<li>Firm Experience</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The firm should be able to demonstrate extensive experience and successful delivery of measurable zones demand assessments in sub-Saharan Africa working with both public and private sector stakeholders. The firm selected for this assignment should have at least Ten (10) years of relevant experience in demand assessment.</p>\n\n<p>Proposals shall include a resume detailing relevant academic qualifications and expertise for all team members and their relationship with the bidder including sub-contractors. Where sub-contractors are used, your quotation should clearly identify that part of the project to be undertaken by the sub-contractors. The bidder should identify the team leader and who among them shall deputize in the team leader&rsquo;s absence.</p>\n\n<ol>\n\t<li>A brief history of the firm including a copy of an organization chart showing each team member proposed by the bidder.</li>\n\t<li>Details of similar assignments undertaken during the last five (5) years. For each assignment presented, the bidder must, where possible, identify the client involved and provide a brief description of the services delivered to the client.</li>\n\t<li>Provide the name, phone number, and email address of the client responsible for the engagement. Please note that these persons may be contacted by LSEZA for references.</li>\n\t<li>A summary profile and CVs of the staff, who will be involved in the assignment.</li>\n</ol>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>Key Expert Positions and Required Experience</li>\n\t</ol>\n\t</li>\n</ol>\n\n<table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:654px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Expert/Position</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:516px\">\n\t\t\t<p><strong>Required Skills</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\">\n\t\t\t<p><strong>SEZ Economist</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:516px\">\n\t\t\t<ol>\n\t\t\t\t<li>Minimum 5 years of experience in special economic zone (SEZ) development, economic planning, and policy advisory.</li>\n\t\t\t\t<li>Expertise in economic modeling, feasibility studies, and investment strategies related to SEZs.</li>\n\t\t\t\t<li>Proven track record in conducting demand assessments, economic impact evaluations, and financial sustainability analyses for industrial zones.</li>\n\t\t\t\t<li>Strong knowledge of trade, taxation policies, and incentive frameworks for SEZs.</li>\n\t\t\t\t<li>Experience in training is an added advantage.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Infrastructure Specialist</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:516px\">\n\t\t\t<ol>\n\t\t\t\t<li>Extensive expertise in industrial infrastructure planning, design, and development.</li>\n\t\t\t\t<li>Experience in zoning regulations, land-use planning, and urban development related to economic zones.</li>\n\t\t\t\t<li>Strong background in public-private infrastructure partnerships (PPPs) for SEZs.</li>\n\t\t\t\t<li>Knowledge of utility planning (electricity, water, roads, waste management) and logistics optimization within industrial parks.</li>\n\t\t\t\t<li>Experience in training is an added advantage.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Investment Specialist</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:516px\">\n\t\t\t<ol>\n\t\t\t\t<li>Strong background in foreign direct investment (FDI) attraction, business development, and investor relations.</li>\n\t\t\t\t<li>Experience in market positioning, competitive benchmarking, and business climate analysis to attract SEZ investors.</li>\n\t\t\t\t<li>Proven ability to structure investment frameworks, financial incentives, and economic policy recommendations for SEZ development.</li>\n\t\t\t\t<li>Strong connections with global trade and investment networks.</li>\n\t\t\t\t<li>Experience in training is an added advantage.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Environmental and social Specialist </strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:516px\">\n\t\t\t<ol>\n\t\t\t\t<li>Experience in environmental and social impact assessment</li>\n\t\t\t\t<li>Expertise in geographic information systems (GIS), remote sensing, and spatial analysis for SEZ planning.</li>\n\t\t\t\t<li>Proficiency in using GIS tools (ArcGIS, QGIS) to assess land use, topography, and infrastructure suitability for SEZs.</li>\n\t\t\t\t<li>Experience in mapping industrial zones, conducting geospatial feasibility studies, and integrating spatial data into economic planning.</li>\n\t\t\t\t<li>Strong analytical skills to provide data-driven insights for land development, zoning, and environmental impact assessment.</li>\n\t\t\t\t<li>Experience is training is an added advantage.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li>KEY DELIVERABLES</li>\n</ol>\n\n<p>Demand Assessment of a Zone for the Liberia Special Economic Zones Authority (LSEZA)&nbsp;outlines essential deliverables that the consulting firm is expected to provide. These deliverables are critical to ensuring the successful completion of the demand assessment and the achievement of the project&#39;s objectives. They include the following:</p>\n\n<table align=\"left\" cellspacing=\"0\" style=\"border-collapse:collapse; width:624px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:19px; vertical-align:top; width:624px\">\n\t\t\t<p><strong>Deliverables&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Essential Deliverable Focus </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:240px\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Timeline</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:19px; vertical-align:top; width:108px\">\n\t\t\t<p>Percentage of Payment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Inception Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>A detailed work plan, methodology, and timeline for executing the demand assessment.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; width:138px\">\n\t\t\t<p>Two Weeks after the signing of contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:108px\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Stakeholder Engagement and training update Reports</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>-Summary of consultations with key stakeholders, including government agencies, private sector actors, and potential investors.</p>\n\n\t\t\t<p>- Capacity building training for LSEZA staff members</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"7\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; width:138px\">\n\t\t\t<p>Two Months, two weeks after the clearance of inception report</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"7\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:108px\">\n\t\t\t<p>50%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Market Demand Analysis and training Update Reports</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>Evaluation of sectoral opportunities, trade trends, and investment potential for the proposed SEZs.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Economic Viability and training update reports</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>Assessment of economic feasibility, projected revenues and revenue sharing modality approach, job creation, and long-term sustainability of SEZ development.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Infrastructure and Location Suitability Report</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>Analysis of site selection, infrastructure needs, and logistical considerations for SEZ success.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Policy and Regulatory Framework Analysis</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:39px; vertical-align:top; width:240px\">\n\t\t\t<p>Review of existing SEZ policies, investment incentives, and governance structures, with recommendations for improvements.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:31px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>SWOT and Competitive Analysis</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:31px; vertical-align:top; width:240px\">\n\t\t\t<p>Identification of Strengths, Weaknesses, Opportunities, and Threats for the proposed SEZs, with benchmarking against regional competitors.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:3px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Risk Assessment and Mitigation Strategy and training update reports</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:3px; vertical-align:top; width:240px\">\n\t\t\t<p>Identification of potential risks, including economic, political, and environmental challenges, and recommended mitigation measures.</p>\n\n\t\t\t<p>Capacity building for LSEZA staff members</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:16px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Draft Final Report and Validation</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; vertical-align:top; width:240px\">\n\t\t\t<p>Compilation of findings, recommendations, and proposed roadmap for SEZ implementation, subject to stakeholder review and validation</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; width:138px\">\n\t\t\t<p>Two weeks after the clearance of deliverable 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:16px; vertical-align:top; width:108px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:138px\">\n\t\t\t<p><strong>Final Report and Presentation</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:240px\">\n\t\t\t<p>Submission of the final validated report, including a formal presentation to LSEZA and key stakeholders.</p>\n\n\t\t\t<p>Final training for the staff</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; width:138px\">\n\t\t\t<p>Two Weeks after the clearance of deliverable 3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:58px; vertical-align:top; width:108px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>APPROACH, REPORTING LINE AND IMPLEMENTATION ARRANGEMENTS</li>\n</ol>\n\n<p>The consulting firm will execute the assignment and will be monitored by LSEZA&rsquo;s focal person and the LIFT-P&rsquo;s Project Implementation Unit, as the implementing body for the Liberia Investment, Finance, and Trade Project, LIFT-P will play a key coordinating and leadership role in ensuring that the consulting firm delivers as per the agreement. In addition, the service firm will work closely with the Liberia Special Economic Zone Authority or its focal person to deliver on this assignment.&nbsp;</p>\n\n<ol>\n\t<li>&nbsp;DURATION OF CONSULTANCY</li>\n</ol>\n\n<p>The assignment will be conducted over a period of four (4) months, commencing from the date of contract signing. During this period, the consulting firm will undertake a comprehensive demand assessment, including data collection, stakeholder engagement, analysis, and reporting. The timeline is structured to ensure that each phase of the assessment is executed systematically, allowing sufficient time for consultations, data validation, and formulation of evidence-based recommendations.&nbsp;</p>\n\n<p>The consulting firm will be required to adhere to the agreed-upon project milestones, including the submission of inception, interim, and final reports within the stipulated timeframe. Regular progress updates will be provided to the Liberia Special Economic Zones Authority (LSEZA) to ensure transparency, alignment with project objectives, and timely resolution of any challenges encountered during the assessment. The final report, inclusive of all key findings, recommendations, and strategic investment insights, must be submitted for review and approval before the completion of the assignment.</p>\n\n<p>The firm will provide regular progress updates to the Liberia Special Economic Zone Authority through its Executive Chairman to ensure work is delivered on schedule and with the expected quality. All written reports are to be discussed in full of the workgroup, and this should be reflected within the final version of the information being written. After the project, the consulting firm will submit a final report, subject to full approval, from the LSEZA, regarding the document acceptance and disagreements.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00417578","notice_type":"General Procurement Notice","noticedate":"23-Dec-2025","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Viet Nam","project_id":"P509666","project_name":"Integrated Resilient Development Project","contact_address":"No. 200 Tran Hung Dao Street, Quy Nhon ward, Gia Lai province","contact_ctry_name":"Viet Nam","contact_email":"thitotan1966@gmail.com","contact_name":"To Tan Thi","contact_organization":"Gia Lai Province Agriculture and Rural Development Project Management Unit","contact_phone_no":"84 913 408 278","submission_date":"2025-12-23T00:00:00Z","notice_text":"<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:121px\">\n\t\t\t<p>Country:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:487px\">\n\t\t\t<p>Socialist Republic of Viet Nam</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:121px\">\n\t\t\t<p>Project:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:487px\">\n\t\t\t<p>Integrated Resilient Development Project</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:121px\">\n\t\t\t<p>Sector:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:487px\">\n\t\t\t<p>Urban resilience</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:121px\">\n\t\t\t<p>Loan No.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:487px\">\n\t\t\t<p>98710-VN, 98720-VN Dated December 12, 2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:121px\">\n\t\t\t<p>Project ID No.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:487px\">\n\t\t\t<p>P509666</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;The Socialist Republic of Vietnam has received financing in the amount of US$ 68,400,000 equivalent from the World Bank toward the cost of the Integrated Resilient Development Project &ndash; Gia Lai Province, and US$ 76,570,000 equivalent toward the cost of Integrated Resilient Development Project &ndash; Da Nang City. It intends to apply part of the proceeds of this financing to payments for works to be procured under this project.</p>\n\n<p>The project will include the following components:</p>\n\n<p><strong>Support to Gia Lai Province</strong></p>\n\n<p>(a) Constructing selected roads and bridges to enhance access between NH19C and Quy Nhon Port.</p>\n\n<p>(b) Constructing and rehabilitating selected coastal roads and bridges to enhance access between An Luong Commune and Hoai Nhon Dong Commune.</p>\n\n<p>(c) Supporting Gia Lai Province&rsquo;s Project management and implementation, including, <em>inter alia</em>: (i) detailed engineering designs and construction supervision; and (ii) required land acquisition, compensation and site clearance.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Support to Da Nang City</strong></p>\n\n<p>(a) Rehabilitating selected sections of the Truong Giang River channel, including dredging and constructing riverbank protections.</p>\n\n<p>(b) Constructing a flood by-pass channel, including combined water gate and ship lock, to divert flood water to Truong Giang River.</p>\n\n<p>(c) Constructing selected bridges across Truong Giang River.</p>\n\n<p>(d) Supporting Da Nang City&rsquo;s Project management and implementation, including, inter alia: (i) detailed engineering designs and construction supervision; and (ii) required land acquisition, compensation and site clearance.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Summary procurement plans funded by the World Bank that will be procured under the project are as below:</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:625px\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:63px; width:47px\">\n\t\t\t<p><strong>Ref No</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:63px; vertical-align:top; width:181px\">\n\t\t\t<p><strong>Summary of Contracts that will be procured</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:63px; vertical-align:top; width:85px\">\n\t\t\t<p><strong>Estimated Cost US$ (million)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:63px; vertical-align:top; width:79px\">\n\t\t\t<p><strong>Number of Packages</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:1px solid black; border-top:1px solid black; height:63px; vertical-align:top; width:233px\">\n\t\t\t<p><strong>Brief description of the Contracts</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:47px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:181px\">\n\t\t\t<p><strong>Gia Lai Province</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:85px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:79px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:42px; width:233px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:47px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:181px\">\n\t\t\t<p>Summary of the NCB (Works packages)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:85px\">\n\t\t\t<p>75.24</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:79px\">\n\t\t\t<p>06</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:233px\">\n\t\t\t<p><strong>CW-01 &ndash; Construction Works:</strong> Construction of Road Section from National Highway 19C to Quy Nhon Port &ndash; Section 1 (Km0 to Km1+159.97), including Trường &Uacute;c Bridge, roadbed construction, pavement structure, drainage works, traffic safety facilities, and associated ancillary works.</p>\n\n\t\t\t<p><strong>CW-02 &ndash; Construction Works </strong>Construction of Road Section from National Highway 19C to Quy Nhon Port - Section 2<strong> </strong>(Km1+159.97 to Km4+318.32), including roadbed construction, pavement structure, drainage works, traffic safety facilities, electrical and lighting system and associated ancillary works.</p>\n\n\t\t\t<p><strong>CW-03 &ndash; Construction Works:</strong> Construction of Road Section from National Highway 19C to Quy Nhon Port &ndash; Section 3 (Km4+318.32 to Km6+353.03), including S&ocirc;ng Dinh Bridge, roadbed construction, pavement structure, drainage works, traffic safety facilities, and associated ancillary works.</p>\n\n\t\t\t<p><strong>CW-04 &ndash; Construction Works:</strong> Construction of Coastal Road from My Thanh to Lai Giang &ndash; Section 1 (Km45+00 to Km57+00), including roadbed construction, pavement structure, drainage works, traffic safety facilities, electrical and lighting system and associated ancillary works.</p>\n\n\t\t\t<p><strong>CW-05 &ndash; Construction Works:</strong> Construction of Coastal Road from My Thanh to Lai Giang &ndash; Section 2 (Km57+00 to Km72+347.20), including H&agrave; Ra Bridge, roadbed construction, pavement structure, drainage works, traffic safety facilities, and associated ancillary works.</p>\n\n\t\t\t<p><strong>CW-06 &ndash; Construction Works:</strong> Construction of Coastal Road from My Thanh to Lai Giang &ndash; Section 3 (Km72+347.20 to Km83+098.39), including C&ocirc;ng Lương Bridge, roadbed construction, pavement structure, drainage works, traffic safety facilities, and associated ancillary works.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:47px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:181px\">\n\t\t\t<p><strong>Da Nang City</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:85px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:79px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:233px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:42px; width:47px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:181px\">\n\t\t\t<p>Summary of the NCB (Works packages)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:85px\">\n\t\t\t<p>84.23</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:79px\">\n\t\t\t<p>09</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:42px; width:233px\">\n\t\t\t<p><strong><strong>QN-WB-01 &ndash; Construction Works:</strong><strong> </strong>Construction of B&igrave;nh Dương Bridge crossing Trường Giang River, including bridge structure, approach roads, drainage, traffic safety facilities, and associated ancillary works.</strong></p>\n\n\t\t\t<p><strong><strong>QN-WB-02 &ndash; Construction Works:</strong><br />\n\t\t\tConstruction of Hưng Mỹ Bridge crossing Trường Giang River, comprising bridge structure, access roads, drainage, traffic safety works, and related auxiliary works.</strong></p>\n\n\t\t\t<p><strong><strong>QN-WB-03 &ndash; Construction Works:</strong><br />\n\t\t\tConstruction of B&igrave;nh Nam Bridge crossing Trường Giang River, including bridge construction, approach roads, drainage facilities, traffic safety systems, and associated works.</strong></p>\n\n\t\t\t<p><strong><strong>QN-WB-04 &ndash; Construction Works</strong><strong>:</strong><br />\n\t\t\tConstruction of Tịnh Thủy Bridge crossing Trường Giang River, including bridge works, approach roads, drainage systems, traffic safety works, and ancillary facilities.</strong></p>\n\n\t\t\t<p><strong><strong>QN-WB-05 &ndash; Construction Works: </strong><strong>Construction of Tam Thanh Bridge crossing Trường Giang River, including bridge works, approach roads, drainage, traffic safety measures, and auxiliary infrastructure.</strong></strong></p>\n\n\t\t\t<p><strong>QN-WB-06 &ndash; Construction Works:</strong><strong> </strong>Construction of Tam Tiến Bridge (N5, rural bridge) crossing Trường Giang River, including bridge structure, approach roads, drainage works, traffic safety facilities, and related works.</p>\n\n\t\t\t<p><strong>QN-WB-07:</strong><strong> </strong>Dredging and river improvement works for Trường Giang River &ndash; Section 1 (Km0 &ndash; Km30), including dredging, disposal of dredged materials, bank protection, and associated works.</p>\n\n\t\t\t<p><strong>QN-WB-08:</strong> Dredging and river improvement works for Trường Giang River &ndash; Section 2 (Km30 &ndash; Km60), including dredging, sediment disposal, bank protection, and ancillary works.</p>\n\n\t\t\t<p><strong>QN-WB-09: </strong>Construction of Tam Kỳ City flood drainage complex, including flood control channels, drainage infrastructure, regulating structures, and associated technical works.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:21px; width:47px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:181px\">\n\t\t\t<p><strong>&nbsp;Total</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:85px\">\n\t\t\t<p><strong>159.47</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:79px\">\n\t\t\t<p><strong>15</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:21px; width:233px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong><em>Note: The estimated cost (million USD) includes VAT, with the VAT portion being covered by the local government budget.</em></strong></p>\n\n<p>&nbsp;</p>\n\n<p>Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank&rsquo;s <em>Procurement Regulations for IPF Borrowers (September 2023) (Procurement Regulations)</em>, and is open to all eligible firms and individuals&nbsp; as defined in the <em>Procurement Regulations</em>. After project negotiations, the World Bank shall arrange the publication on its external website of the agreed initial procurement plan and all subsequent updates once it has provided a no objection.</p>\n\n<p>Specific procurement notices for contracts will be announced, as they become available, in Viet Nam Electronic Procurement System (VNEPS).</p>\n\n<p>Interested eligible firms and individuals who would wish to be considered for the provision of goods, works, non-consulting services and consulting services for the above-mentioned project, or those requiring additional information, should contact the Borrower at the address below:</p>\n\n<p>&nbsp;</p>\n\n<p>1. Gia Lai province Agriculture and Rural Development Project Management Unit</p>\n\n<p>2. Mr: To Tan Thi &ndash; Director</p>\n\n<p>3. Address: No. 200 Tran Hung Dao, Quy Nhon ward, Gia Lai province.</p>\n\n<p>4. Telephone number: 0269 2200122</p>\n\n<p>5. Email: ppmunngialai@gmail.com</p>\n\n<p>&nbsp;</p>\n\n<p>1. Quang Nam Project Management Unit of Transport Construction Works</p>\n\n<p>2. Mr. Nguyen Van Thuong - Director</p>\n\n<p>3. Address: No. 48 Vo An Ninh Street, Hoa Xuan Ward, Da Nang City.</p>\n\n<p>4. Telephone number: 02363.681.779</p>\n\n<p>5. Email: qldactgt@gmail.com</p>"}]}