{"rows":20,"os":"0","page":"1","total":"395","procnotices":[{"id":"OP00459369","notice_type":"Request for Expression of Interest","noticedate":"28-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-20T00:00:00Z","submission_deadline_time":"12:00","project_ctry_name":"Egypt, Arab Republic of","project_id":"P172426","project_name":"Supporting Egypt’s Universal Health Insurance System","bid_reference_no":"EG-MOF-545938-CS-QBS","bid_description":"Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR's E-learning platform","procurement_group":"CS","procurement_method_code":"QBS","procurement_method_name":"Quality Based Selection","contact_address":"Finance Ministry Towers - Ramses Extension - Nasr City - Cairo.","contact_ctry_name":"Egypt, Arab Republic of","contact_email":"yara_gamal13@hotmail.com","contact_name":"Yara Gamal","contact_organization":"Ministry of Finance","contact_phone_no":"+201141221444","contact_web_url":"https://mof.gov.eg/ar","submission_date":"2026-07-28T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p><strong><em>Egypt</em></strong></p><p><strong>Supporting Egypt&rsquo;s Universal Health Insurance System Project</strong></p><p>Loan No.: IBRD-91320</p><p><strong>Assignment Title:&nbsp;</strong>Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR&#39;s E-learning platform</p><p><strong>Reference No:</strong>EG-MOF-545938-CS-QBS</p><p>The Ministry of Finance has received a loan of $400M from the World Bank toward the cost of the Supporting Egypt&rsquo;s Universal Health Insurance System Project, and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include consultancy aimed for&nbsp;Contracting with a consultancy firm for the provision of technical assistance to develop GAHAR&#39;s E-learning platform</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>The &ldquo;Supporting Egypt&rsquo;s Universal Health Insurance System Project&rdquo; now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services.</p><p>Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services (company profile, brochures, experience in similar assignments, availability of appropriate skills and resources, ... etc.).</p><p>The requested qualifications are:</p><ul><li><strong>Experience:</strong><ul><li>At least 10 years of proven corporate experience in designing, developing, and deploying high-traffic, secure e-learning platforms (LMS).</li><li>Demonstrated experience in end-to-end <strong>instructional design</strong> for adult professional learners.</li><li>An extensive portfolio of high-quality <strong>multimedia production</strong> (videos, animations, graphic design) for educational or corporate training purposes.</li></ul></li><li><strong>Technical Capabilities:</strong><ul><li>Expertise in modern web development frameworks, database management, and cloud hosting.</li><li>Expertise in LMS standards (e.g., SCORM, xAPI) and e-commerce integration.</li><li>&nbsp;</li></ul></li><li><strong>Proposed Team:</strong> The consultant must propose a team of key experts with the following minimum qualifications:<ul><li><strong>Project Manager:</strong> 8+ years experience managing complex IT and media projects.</li><li><strong>Lead Instructional Designer:</strong> 8+ years experience in designing e-learning curricula for professional audiences.</li><li><strong>Lead Developer / Tech Lead:</strong> 8+ years experience in full-stack development, specializing in LMS or large-scale web applications.</li><li><strong>Lead Media Producer:</strong> 8+ years experience in professional video and animation production.</li></ul></li></ul><p><em>Note: Experience in medical or nursing education is </em><strong><em>not</em></strong><em> required. The consultant will be provided with all technical medical content</em></p><p>Where a consortium is proposed, one lead firm shall assume overall contractual accountability and shall clearly demonstrate how the expertise required across both pillars will be integrated through a unified project-management and quality-assurance approach.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the&nbsp;<em>QBS</em>&nbsp;method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below during office hours 10.00 am to 4.00 pm &ndash; Sunday to Thursday.</p><p>Expressions of interest must be delivered in a written form to the address below by e-mail by 30th June, 2026</p><p>Supporting Egypt&rsquo;s Universal Health Insurance System Project.</p><p>Attn: Yara Gamal &ndash;&nbsp; Procurement Specialist.</p><p>Ministry of Finance.</p><p>Cairo &ndash; Egypt.</p><p>Tel: +2011141221444</p><p>E-mail: yara_gamal13@hotmail.com</p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <u>Term of Reference (TOR)</u></strong></p><p><strong><u>GAHAR E &ndash; Learning Academy</u></strong></p><p>&nbsp;</p><p>The Ministry of Finance has received a loan of $400M from the World Bank toward the cost of the Supporting Egypt&rsquo;s Universal Health Insurance System Project, and intends to apply part of the proceeds for consulting services.</p><p>The consulting services (&ldquo;the Services&rdquo;) include design and execution of a comprehensive GAHAR E- Learning Academy platform with Content Development: Develop the content for the e-learning materials in alignment with the identified learning objectives.&nbsp;&nbsp; for the General Authority for Healthcare Accreditation and Regulation &ndash;GAHAR through partnership with a reputable national organization.</p><ol><li><strong><u>Background: The General Authority for Healthcare Accreditation and Regulation &ndash; GAHAR:</u></strong></li></ol><p>GAHAR was established under Law No. 2 for the year 2018 pertaining to the Universal Health Insurance system.</p><p>GAHAR is responsible of ensuring the quality of the healthcare services, and its continuous improvement; regulating the healthcare sector according to quality standards; accrediting the healthcare facilities according to these standards; and ensuring the sustainability of its implementation through regular monitoring., strongly rooted in its independence, which is stipulated by law. GAHAR is an independent authority Under the general and direct supervision of his Excellency, President of Egypt, Abdel-Fattah El-Sisi</p><p>GAHAR is mandated with the regulations, accreditation, rigorous monitoring and oversight of the healthcare facilities. it aims at attaining the best standardized quality for health throughout all healthcare facilities; Hospitals, pharmacies, clinics, and other healthcare facilities as defined in point 15 of article one in the law number two for year 2018. GAHAR&#39;s strategy has identified its mission in two main blocks: Excellence and Distinction, in pursuit to put Egypt on the edge of a new era for health care.</p><p>GAHAR handbooks are the guiding tool for healthcare facilities and surveyors, on GAHAR&rsquo; standards for accreditation and requirements for registration. To ensure its conformity with the best international practices, GAHAR applies to attain accreditation for its standards from the International Society for Quality in Healthcare &ndash;ISQua&rsquo;. Till now, GAHAR has issued the following accreditation &lsquo;handbooks:&nbsp;</p><p>&nbsp;</p><ul><li>GAHAR handbook for Hospitals standards. (ISQua Accredited).</li><li>GAHAR handbook for Primary Health Care-PHC standards (ISQua Accredited).</li><li>GAHAR handbook for Clinical laboratories standards. (ISQua Accredited).</li><li>GAHAR handbook for Physical therapy accreditation standards. (ISQua Accredited).</li><li>GAHAR handbook for Ambulatory healthcare accreditation standards. (ISQua Accredited).</li><li>&nbsp;GAHAR handbook for Radiology centers. &nbsp;(ISQua Accredited).</li><li>GAHAR handbook for Mental health.&nbsp; (ISQua Accredited).</li><li>GAHAR handbook for convalescent long &ndash; term healthcare and medical wellness accreditation standard.&nbsp; (ISQua Accredited).</li><li>GAHAR handbook for National Guide for Medical Equipment for Hospital.</li></ul><p>&nbsp;</p><p><strong><u>GAHAR Mission: </u></strong></p><p>Commitment to ensuring the quality of healthcare services and its continuous improvement in the Arab Republic of Egypt, and affirming trust in its outcomes at national, regional, and international levels through issuance and development of internationally recognized national quality standards, supporting their implementation, accrediting healthcare facilities accordingly, and continuous monitoring; to achieve excellence and sustainability.</p><p>&nbsp;</p><p><strong><u>GAHAR vision:</u></strong></p><p>To be a pioneering national authority, well-recognized regionally and internationally in ensuring the quality of healthcare services and its sustainability.</p><p>&nbsp;</p><p><strong><u>GAHAR training center:</u></strong></p><p>In alignment with the General Authority for Healthcare Accreditation and Regulations (GAHAR) mission to promote a culture of quality, and in partnership with healthcare service providers in Egypt, GAHAR is committed to raising community awareness of patient safety, fostering a culture of continuous improvement within healthcare facilities, and preparing these facilities to implement healthcare quality standards to achieve accreditation and join the Universal Health Insurance System (UHIS). To support these efforts, GAHAR has established a training center accredited by the Central Agency for Organization and Administration and the Egyptian Health Council.</p><p>The center aims to empower professionals and facilities to:</p><ul><li>Raise <strong>community awareness</strong> of patient safety.</li><li>Foster <strong>continuous improvement</strong> across health facilities.</li><li>Prepare facilities to <strong>implement quality standards</strong>, achieve accreditation, and transition smoothly into the UHIS framework.</li></ul><p><strong><u>GAHAR certification </u></strong></p><p><strong>GAHAR EGYCAP</strong> (Egyptian Certified Accreditation Professional)</p><ul><li>A firstofitskind professional diploma accredited by the Egyptian Health Council and recognized national regionally</li><li>All the Applicants have to a receive a diploma in one of universities that signed a protocol with GAHAR , this diploma include 8 modules cover all the standards , then they receive a complementary course in GAHAR about primary health care standards , finally they have to pass GAHAR &ndash; EGY CAP certificate exam organized by GAHAR</li><li>&nbsp;The reflection of EGY &ndash; Cap on upgrading leaders&rsquo; skills &nbsp;in implementing GAHAR standards, patient-safety frameworks, and continuous quality improvement</li><li>The graduates will be able to work as accreditation professionals which is a new profession in healthcare field, these graduates will help healthcare facilities in their journey for accreditation</li></ul><p><strong><u>2. Project Goal And Objectives</u></strong></p><p><strong>2.1. Overall Goal</strong></p><p>The overall goal of this assignment is to establish the &quot;GAHAR E-Learning Academy,&quot; a high-quality, accessible, and sustainable digital education platform. The Academy will serve as the central hub for training healthcare professionals in Egypt on GAHAR&#39;s quality and accreditation standards, patient safety, and continuous improvement principles, supporting the national Universal Health Insurance System (UHIS).</p><p><strong>2.2. Specific Objectives</strong></p><p>The specific objectives of this consultancy are to:</p><ol><li><strong>Design and Deploy</strong> a secure, scalable, and user-friendly Learning Management System (LMS) that functions seamlessly on desktop and mobile devices.</li><li><strong>Digitize and Produce</strong> GAHAR&rsquo;s technical content into engaging, high-quality e-learning modules (including videos, animations, interactive case studies, and assessments).</li><li><strong>Build Capacity</strong> within GAHAR to manage, update, and scale the E-Learning Academy independently.</li><li><strong>Establish a Platform</strong> that serves as a sustainable model for continuous professional development (CPD) for the Egyptian healthcare workforce.</li></ol><p><strong><u>3. Target Audience</u></strong></p><p>The primary target audiences for the E-Learning Academy include:</p><ul><li><strong>Healthcare Professionals:</strong> Doctors, nurses, pharmacists, and allied health professionals seeking CPD and certification (e.g., GAHAR EGYCAP).</li><li><strong>Healthcare Administrators and Leaders:</strong> Facility managers and policymakers responsible for implementing quality improvement systems.</li><li><strong>GAHAR Surveyors:</strong> Trainee and current surveyors requiring standardized training on accreditation processes.</li><li><strong>Public Health Practitioners:</strong> Professionals aiming to enhance their competencies in healthcare management and quality.</li><li><strong>Regional and International Learners:</strong> Professionals from other countries interested in GAHAR&#39;s accredited standards.</li></ul><p>&nbsp;</p><p><strong><u>5. Scope Of Work</u></strong></p><p>The consultant shall be responsible for all activities, personnel, and resources required to deliver the E-Learning Academy. The scope is divided into two main components.</p><p><strong>GAHAR&#39;s Role in Content:</strong> For all content-related tasks, GAHAR will act as the <strong>Subject Matter Expert (SME)</strong>. GAHAR will provide all technical source materials, accreditation handbooks, case study information, and raw data. The consultant is responsible for transforming this technical information into engaging e-learning experiences.</p><p><strong>Component 1: E-Learning Platform Development</strong></p><p>The consultant shall design, develop, test, and deploy a robust and scalable Learning Management System (LMS) with the following <strong>functional requirements</strong>:</p><ol><li><strong>LMS Core:</strong> A secure system for user registration, authentication, and profile management. GAHAR shall hold full ownership rights to the platform&#39;s source code, database, and all associated intellectual property upon delivery. The consultant must deliver the full, unencrypted source code and provide a perpetual, royalty-free license for any third-party components used.</li><li><strong>Standards </strong><strong>and Interoperability:</strong> The LMS must be fully compliant with international e-learning standards, specifically SCORM 1.2/2004, xAPI (Tin Can), and AICC. This ensures that all content produced is portable and prevents vendor lock-in, allowing GAHAR to migrate content to other systems if needed in the future.</li><li><strong>Course Management:</strong> An admin panel for GAHAR staff to easily create, upload, update, and manage courses and learning paths.</li><li><strong>Responsive Design:</strong> A fully responsive UI/UX (in both Arabic and English) that provides an optimal experience on desktops, tablets, and mobile smart phones.</li><li><strong>Assessment Engine:</strong> Ability to create diverse assessments (quizzes, summative exams, case-based evaluations) with features like question banks, randomization, and automated grading.</li><li><strong>Progress Tracking:</strong> Dashboards for learners to track their progress and for administrators to monitor user engagement and completion rates.</li><li><strong>Certification:</strong> Automated generation and delivery of certificates (e.g., PDF format) upon successful completion of a course or learning path.</li><li><strong>Interactive Tools:</strong> Features to enhance engagement, such as discussion forums, live chat capabilities, and scheduled QandA sessions with experts.</li><li><strong>E-commerce Integration:</strong> Integration with secure national payment gateways (e.g., Fawry, Paymob) and bank APIs to manage course fees.</li><li><strong>Analytics and Reporting:</strong> A comprehensive analytics dashboard for GAHAR to track key metrics (e.g., enrollment, user activity, completion rates, assessment scores).</li><li><strong>Security and Data Protection:</strong> Full compliance with Egypt&rsquo;s personal data protection law (Law No. 151 of 2020) and international data security standards.</li><li><strong>&nbsp;Infrastructure and Hosting Strategy:</strong></li></ol><ul><li><strong>Initial Deployment:</strong> The Consultant shall provide and manage a secure, high-availability cloud infrastructure (e.g., AWS, Azure, GCP, or a local Data Center) guaranteeing 99.9% uptime for the duration of the contract. The cost of this hosting must be clearly identified in the financial proposal.</li><li><strong>Portability and Migration:</strong> To ensure long-term sustainability and data sovereignty, the platform must be containerized and architected to be infrastructure-agnostic. The Consultant must demonstrate that the entire system (code, database, and assets) can be technically and legally migrated to GAHAR&rsquo;s own data center or government cloud in the future without loss of functionality or significant re-engineering.</li><li><strong>Data Ownership:</strong> GAHAR retains full legal ownership of all data hosted on the platform.</li></ul><p><strong>Component 2: E-Learning Content Production</strong></p><p>The consultant shall work with GAHAR SMEs to perform the instructional design and multimedia production for the curriculum.</p><ol><li><strong>Instructional Design:</strong><ul><li>Review GAHAR&#39;s technical source materials (handbooks, lectures, EGYCAP content).</li><li>Develop detailed storyboards and scripts for all multimedia content, optimized for adult e-learning.</li><li>Design the pedagogical structure for each course, including learning objectives, module flow, and assessment strategy.</li></ul></li><li><strong>Multimedia Production:</strong><ul><li>Produce all multimedia assets defined in the curriculum (see Section 6). This includes filming GAHAR experts, recording voice-overs, and designing all graphics and animations.</li><li>Edit all assets into high-quality, web-optimized formats (e.g., SCORM-compliant packages).</li></ul></li><li><strong>Course Assembly:</strong><ul><li>Assemble all assets (videos, quizzes, readings) into cohesive course modules within the LMS.</li><li>Conduct internal Quality Assurance (QA) on all modules for technical functionality, accessibility, and instructional clarity.</li></ul></li></ol><p><strong><u>7. </u></strong><strong><u>Component 2: </u></strong><strong><u>E-Learning Content Production - Overview:</u></strong></p><p><strong>Placeholder Curriculum:</strong> The consultant shall base their proposals on developing the following initial curriculum. The final list and topics will be confirmed during the project&#39;s inception phase.</p><ol><li><strong>Modules:</strong> 8 modules covering all GAHAR standards.</li><li><strong>Media Assets (to be produced):</strong><ul><li><strong>12 Educational Videos:</strong> Professionally filmed and edited videos of GAHAR experts explaining key concepts (approx. 10-15 minutes each).</li><li><strong>6 Animation Videos:</strong> 2D/3D animated videos to explain complex processes or concepts (approx. 2-5 minutes each).</li><li><strong>6 Graphic Videos:</strong> Motion-graphic videos (approx. 2-5 minutes each).</li></ul></li><li><strong>Assessments:</strong> Formative quizzes for each module and a final summative exam.</li></ol><p>&nbsp;</p><p><strong><u>8. Component 2: E-Learning Content Production &ndash; Structure details:</u></strong></p><p><strong>2.1-Multimedia Content</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Format</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p><strong>Purpose</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Training Material</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Modules and media assets as per the GAHAR curriculum (provided by GAHAR)</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Instructor Videos</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>GAHAR-accredited experts explaining key concepts</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Interactive Slideshows</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Accreditation checklists, patient safety modules</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Simulations/Case Studies</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:509px\"><p>Real-world quality improvement and safety scenarios, their material developed by GAHAR</p></td></tr></tbody></table><p><strong>2.2Assessment Tools</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p><strong>Tool Type</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:522px\"><p><strong>Description</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px\"><p>Formative Quizzes</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px; width:522px\"><p>Embedded in each module, auto graded</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p>Summative Exams</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:522px\"><p>Required for certification, timed and randomized questions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px\"><p>Assignments</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:21px; width:522px\"><p>Uploaded through portal, reviewed by moderators or course leads</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>2.3. Text-Based Content</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in\"><p><strong>Format</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in; width:497px\"><p><strong>Purpose</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in\"><p>Reading Packets</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:.2in; width:497px\"><p>GAHAR standards for hospitals, labs, primary care, etc.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px\"><p>Discussion Prompts</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:20px; width:497px\"><p>Encourage critical thinking and peer exchange</p></td></tr></tbody></table><p><strong>2.4- Engagement and Communication Tools</strong></p><table border=\"1\" style=\"width:680px\"><thead><tr><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p><strong>Feature</strong></p></td><td style=\"background-color:#d5dce4; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p><strong>Functionality</strong></p></td></tr></thead><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Discussion Forums</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>Peer-to-peer and expert-to-peer interaction</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Chat with Experts</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>Integrated secure live chat and scheduled QandA sessions</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black\"><p>Notifications and Emails</p></td><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:524px\"><p>System-generated reminders, announcements and deadlines via email/SMS</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><u>9. Platform technical specifications:</u></strong></p><p><strong><u>&nbsp;1-Web site development , Technical &nbsp;features ; </u></strong></p><ol><li><strong>Web &amp; Mobile Architecture</strong></li></ol><ul><li><strong>Frontend Frameworks:</strong> Modern JavaScript component-based architectures (e.g., <strong>React.js</strong>, Angular, or Vue.js).</li><li><strong>Mobile Application:</strong> Native (Swift/Kotlin) or high-performance Cross-platform framework (e.g., <strong>React Native</strong>, Flutter) ensuring 100% functionality on both iOS and Android devices.</li><li><strong>Styling &amp; UI:</strong> Modern CSS frameworks and UI libraries (e.g., <strong>Tailwind CSS</strong>, <strong>Material-UI</strong>, or Bootstrap 5+).</li></ul><ol><li><strong>Backend &amp; Database</strong></li></ol><ul><li><strong>Server Framework:</strong> Scalable, high-performance server-side framework (e.g., <strong>Node.js with Express</strong>, Python Django, or .NET Core).</li><li><strong>Database Management:</strong><ul><li><strong>Primary (Relational):</strong> Robust SQL database for transactional data (e.g., <strong>PostgreSQL</strong>, MySQL, or SQL Server).</li><li><strong>Secondary (Unstructured):</strong> NoSQL database for logs, chats, and unstructured content (e.g., <strong>MongoDB</strong>).</li></ul></li><li><strong>Authentication &amp; Security:</strong> Implementation of standard secure protocols including <strong>OAuth 2.0</strong> and <strong>JWT</strong> (JSON Web Tokens) for secure, stateless user sessions.</li></ul><ol><li><strong>Artificial Intelligence &amp; Machine Learning (AI/ML)</strong></li></ol><ul><li><strong>Recommendation Engine:</strong> Implementation of ML libraries (e.g., <strong>TensorFlow.js</strong>, Scikit-learn) to provide personalized course recommendations based on user behavior.</li><li><strong>Natural Language Processing (NLP):</strong> Integration with LLM APIs (e.g., <strong>OpenAI API</strong>, Azure OpenAI) to power language-based features. <em>Note: Proposals using 3rd party APIs must clearly state ongoing subscription costs.</em></li></ul><ol><li><strong>Infrastructure &amp; Hosting Responsibilities</strong></li></ol><ul><li><strong>Consultant Responsibility:</strong> The Consultant shall be fully responsible for providing, configuring, and paying for the cloud hosting infrastructure (e.g., <strong>AWS [EC2, S3, RDS]</strong>, <strong>Google Cloud Platform</strong>, <strong>Azure</strong>, or a certified Data Center) for the entire duration of the contract. The financial proposal must explicitly include these hosting costs.</li><li><strong>Performance Requirements:</strong> The infrastructure must be scalable (using containerization tools like <strong>Docker</strong> and orchestration via <strong>Kubernetes</strong>) and must guarantee <strong>99.9% uptime</strong>.</li><li><strong>Future Handover:</strong> To ensure sustainability, the system must be designed to be infrastructure-agnostic. The Consultant must include a comprehensive <strong>&quot;Handover Plan&quot;</strong> to migrate the entire platform (code, database, and data) to GAHAR&rsquo;s own servers or a government cloud at the end of the contract term.</li></ul><ol><li><strong>Payment Integration</strong></li></ol><ul><li><strong>Payment Gateways:</strong> Secure integration with major national and international payment providers, specifically <strong>Fawry</strong>, <strong>Paymob</strong>, <strong>Apple Pay</strong>, and direct <strong>Bank API Integrations</strong>.</li></ul><ol><li><strong>Mobile App Advanced Features (Communication &amp; Analytics)</strong></li></ol><ul><li><strong>Communication Services:</strong> Integration with services like <strong>Twilio</strong> or <strong>Firebase</strong> for SMS notifications, OTPs, and real-time messaging.</li><li><strong>Analytics:</strong> Integration with <strong>Google Analytics</strong> (GA4) or Firebase Analytics for user tracking, with capability to export data to custom dashboards using <strong>Tableau</strong> or <strong>Power BI</strong>.</li></ul><ol><li><strong>AI-Powered Support (Chatbot)</strong></li></ol><ul><li><strong>AI Chatbot:</strong> An intelligent chatbot capable of handling common user inquiries and automatically redirecting complex issues to the appropriate support team or resources.</li></ul><p><strong><u>10. </u></strong><strong><u>Project Deliverables and Timeline</u></strong></p><p>The expected duration of the assignment shall be <strong>six (6.5) calendar months</strong> from the contract commencement date, equivalent to approximately 26 weeks. The implementation shall follow an accelerated approach, with platform development, instructional design and multimedia production undertaken through coordinated parallel workstreams.</p><p>&nbsp;</p><p>GAHAR shall provide one consolidated set of comments within <strong>five (5) working days</strong> of receiving each deliverable. The Consultant shall address the comments and resubmit the revised deliverable within a maximum of <strong>five (5) working days</strong>, unless the requested changes constitute a material change to the approved scope.</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:616px\"><thead><tr><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; width:91px\"><p><strong>Project Phase</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:33px\"><p><strong>#</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:112px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:207px\"><p><strong>Main Contents and Acceptance Requirements</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:125px\"><p><strong>Timeline from Contract Commencement Date<br />(including GAHAR review and revision)</strong></p></td><td style=\"background-color:#d9eaf0; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; width:48px\"><p><strong>Payment</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 1: Inception and Requirements Validation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D1</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Inception Report and Detailed Implementation Plan</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Confirmed requirements and scope; implementation methodology; detailed work plan; governance arrangements; stakeholder map; RACI matrix; risk register; content inventory; multimedia production plan; dependency register; QA plan; and deliverable acceptance criteria.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 1-2<br /><strong>Submission: </strong>End of Week 2<br /><strong>GAHAR review: </strong>Week 3 - five working days<br /><strong>Revision and acceptance: </strong>Week 4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 1: Solution and Content Design</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D2</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Technical Design, UI/UX and Instructional Design Package</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>System architecture; technology stack; database and integration design; security and data-protection plan; hosting, backup and migration strategy; bilingual web and mobile prototypes; instructional-design framework; module structure; assessment approach; and representative course blueprint.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 2-5<br /><strong>Submission: </strong>End of Week 5<br /><strong>GAHAR review: </strong>Week 6 - five working days<br /><strong>Revision and acceptance: </strong>Week 7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>15%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 2: Alpha Development and Content Pre-production</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D3</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Alpha Platform and Content-Production Package</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Functional alpha platform covering principal learner, trainer and administrator journeys; user and role management; initial course-management features; approved storyboards and scripts for the eight modules; draft assessment banks; and representative samples of the instructor-video, animation and motion-graphic formats.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 5-10<br /><strong>Submission: </strong>End of Week 10<br /><strong>GAHAR review: </strong>Week 11 - five working days<br /><strong>Revision and acceptance: </strong>Week 12</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>20%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 2: Full Development, Content Production and Pilot</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D4</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Pilot-Ready Beta Platform, Draft Content and Pilot Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Pilot-ready web platform and mobile applications; administration portal; assessments; analytics; notifications; communication tools; payment integrations in sandbox mode; AI-enabled functionality; draft SCORM modules and multimedia content; internal QA; pilot testing with 20-30 users; defect log; pilot report; and corrective-action plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 9-17<br /><strong>Submission: </strong>End of Week 17<br /><strong>GAHAR review: </strong>Week 18 - five working days<br /><strong>Revision and acceptance: </strong>Week 19</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>25%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 3: Finalization and Production Launch</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D5</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Final Multimedia Content and Production Platform</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Final approved content for all eight modules; 12 instructor videos; six animation videos; six motion-graphic videos; quizzes and final examination; fully tested production platform; completed integrations; analytics dashboard; backup and recovery arrangements; performance and security testing; mobile applications submitted to the relevant application stores; approved UAT results; and production launch.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 18-22<br /><strong>Submission: </strong>End of Week 22<br /><strong>GAHAR review: </strong>Week 23 - five working days<br /><strong>Revision and acceptance: </strong>Week 24</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>20%</strong></p></td></tr><tr><td style=\"background-color:#eaf3f5; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:91px\"><p><strong>Phase 4: Stabilization, Training and Handover</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p><strong>D6</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:112px\"><p><strong>Stabilization, Training, Handover and Final Report</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:207px\"><p>Post-launch monitoring; correction of stabilization defects; two-day training for GAHAR staff; source code and repositories; database and configuration files; deployment scripts; technical, administrator and user manuals; system credentials; hosting and licensing records; maintenance and migration guidance; final report; and formal handover certificate.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:125px\"><p><strong>Execution: </strong>Weeks 22-24<br /><strong>Submission: </strong>End of Week 24<br /><strong>GAHAR review: </strong>Week 25 - five working days<br /><strong>Revision and final acceptance: </strong>Week 26</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>10%</strong></p></td></tr><tr><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; width:91px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:33px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:112px\"><p><strong>Total</strong></p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:207px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:125px\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:48px\"><p><strong>100%</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong><u>11. Gahar&#39;s Responsibilities</u></strong></p><p>GAHAR will provide the following to support the consultant:</p><ul><li><strong>Designated Project Team:</strong> Appoint a Project Manager and technical focal points to liaise with the consultant.</li><li><strong>All Technical Content:</strong> Provide all source materials (handbooks, standards, EGYCAP content, case studies) required for content production.</li><li><strong>Access to SMEs:</strong> Ensure timely access to GAHAR&#39;s subject matter experts for content review, storyboarding sessions, and video filming.</li><li><strong>Timely Feedback: </strong>Provide consolidated feedback on all deliverables within five (5) working days of receipt.</li><li><strong>Final Quality Assurance:</strong> GAHAR will conduct the final review and approval (QA) of all content and platform features before public launch.</li><li><strong>Pilot Testers:</strong> Facilitate the recruitment of 20-30 pilot testers from the target audience. The testers would be volunteers of GAHAR surveyors, healthcare professional undergoing CPD and certification (e.g., GAHAR EGYCAP), and facility managers responsible for healthcare quality and no form of payment or allowances will be paid to them. The goal would be to test whether the target audience are able to use to use the learning platform efficiently and effectively without any bugs or issues, and to get their feedback on possible improvements needed.</li></ul><p><strong><u>12. Consultant Qualifications</u></strong></p><p>The consultant must demonstrate the following qualifications:</p><ul><li><strong>Experience:</strong><ul><li>At least 10 years of proven corporate experience in designing, developing, and deploying high-traffic, secure e-learning platforms (LMS).</li><li>Demonstrated experience in end-to-end <strong>instructional design</strong> for adult professional learners.</li><li>An extensive portfolio of high-quality <strong>multimedia production</strong> (videos, animations, graphic design) for educational or corporate training purposes.</li></ul></li><li><strong>Technical Capabilities:</strong><ul><li>Expertise in modern web development frameworks, database management, and cloud hosting.</li><li>Expertise in LMS standards (e.g., SCORM, xAPI) and e-commerce integration.</li><li>&nbsp;</li></ul></li><li><strong>Proposed Team:</strong> The consultant must propose a team of key experts with the following minimum qualifications:<ul><li><strong>Project Manager:</strong> 8+ years experience managing complex IT and media projects.</li><li><strong>Lead Instructional Designer:</strong> 8+ years experience in designing e-learning curricula for professional audiences.</li><li><strong>Lead Developer / Tech Lead:</strong> 8+ years experience in full-stack development, specializing in LMS or large-scale web applications.</li><li><strong>Lead Media Producer:</strong> 8+ years experience in professional video and animation production.</li></ul></li></ul><p><em>Note: Experience in medical or nursing education is </em><strong><em>not</em></strong><em> required. The consultant will be provided with all technical medical content.</em></p><p><strong><u>13. Evaluation Criteria</u></strong></p><p>The Technical Proposal will be evaluated based on the following criteria:</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Criteria</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top\"><p><strong>Max. Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>1. Consultant&rsquo;s General Experience (30 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1.1. Experience in developing scalable e-learning platforms (LMS).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>1.2. Experience in instructional design and multimedia content production for e-learning.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>2. Technical Approach and Methodology (30 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2.1. Clarity and feasibility of the proposed approach for platform development (Component 1).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>2.2. Quality of the proposed methodology for content production and instructional design (Component 2).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>15</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>3. Qualifications of Key Personnel (40 points)</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\">&nbsp;</td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.1. Project Manager</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.2. Lead Instructional Designer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.3. Lead Developer / Tech Lead</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p>3.4. Lead Media Producer</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p>10</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>Total Technical Score</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top\"><p><strong>100</strong></p></td></tr></tbody></table><p><strong><u>Notes:</u></strong></p><ul><li>Technical Experience&nbsp;includes previous projects of similar nature and complexity, demonstrated capabilities, and references, years of experience not less than 8 years&nbsp;.</li><li>Financial Offer&nbsp;will be evaluated based on cost-effectiveness and alignment with project budget.</li><li>Team Structure&nbsp;refers to the composition, roles, and responsibilities of the proposed team.</li><li>Qualifications&nbsp;involve the educational and professional background of key team members.</li></ul>"},{"id":"OP00458474","notice_type":"Invitation for Bids","noticedate":"23-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-13T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Sri Lanka","project_id":"P160005","project_name":"Climate Resilience Multi-Phase Programmatic Approach","bid_reference_no":"SLMOI/CRES/DOM/G/NCB/144","bid_description":"Procurement of: Supply, installation, testing, commissioning, and maintenance of hyper‑converged infrastructure (HCI) and AD/LDAP solution for the Department of Meteorology.","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"No 500,T.B.Jaya Mawatha, Colombo 10,Sri Lanka.\n\nTelephone : +94 11 2689548 - E-mail :sec@mahaweli.go","contact_ctry_name":"Sri Lanka","contact_email":"pdcresmpa@gmail.com","contact_name":"Bandula   Sirimal","contact_organization":"MINISTRY OF IRRIGATION","contact_phone_no":"+94773697239","submission_date":"2026-07-23T00:00:00Z","notice_text":"<p><strong>THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</strong></p><p><strong>Ministry of Agriculture, Livestock, Land and Irrigation</strong></p><p><strong>Climate Resilience Multiphase Programmatic Approach (CResMPA) </strong></p><p><strong>Request for Bids</strong></p><p><strong>Contract title: </strong><strong>Procurement of: Supply, installation, testing, commissioning, and maintenance of hyperconverged infrastructure (HCI) and AD/LDAP solution for the Department of Meteorology.&nbsp;&nbsp;&nbsp; </strong></p><p><strong>RFB No: </strong>SLMOI/CRES/DOM/G/NCB/144</p><p><strong>Issued on:</strong><em> </em>July 23, 2026</p><ol><li>The <strong>Democratic Socialist Republic of Sri Lanka</strong> has received a loan from the financing from the <strong>World Bank</strong> toward the cost of the <strong>Climate Resilience Multiphase Programmatic Approach (CResMPA)</strong> and intends to apply part of the proceeds toward payments under the contract.</li><li>The <strong>Chairman, Project Procurement </strong><strong>Committee </strong>on behalf of <strong>Climate Resilience Multiphase Programmatic Approach</strong> now invites sealed Bids from eligible Bidders for <strong>Procurement of: Supply, installation, testing, commissioning, and maintenance of hyperconverged infrastructure (HCI) and AD/LDAP solution for the Department of Meteorology. </strong>Implementation period: Three months. Warranty, Support and Maintenance: Period: <strong>5 years.</strong></li></ol><p>3. &nbsp; Bidding will be conducted through <strong>National Competitive Procurement</strong> using a Request for Bids (RFB) as specified in the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; February 2025 (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Bidders as defined in the Procurement Regulations.</p><p>Bidder must meet the following minimum qualification criteria:</p><p>(i) General Experience: The Bidder shall have at least five (5) years of experience in the supply, delivery, installation, configuration, testing, and commissioning of enterprise ICT infrastructure solutions of similar nature and complexity, including at least one or more of the following technology areas:</p><ul><li>HyperConverged Infrastructure (HCI)</li><li>Server virtualization platforms</li><li>Softwaredefined or enterprise storage</li><li>Enterprise backup and recovery solutions</li><li>Active Directory / LDAP directory services</li><li>Centralized authentication solutions for server or application environments</li></ul><p>These solutions shall have been completed satisfactorily prior to the bid submission deadline.</p><p>(ii) Specific Experience: The Bidder shall have successfully completed at least one (1) contract during the last five (5) years for the supply, delivery, installation, configuration, testing, and commissioning of enterprise ICT infrastructure or data center solutions, contract value of not less than LKR 140 million. contract shall include at least HCI infrastructure, Software Define Storage or Server virtualization platform.</p><p>(iii) Manufacturer Experience: The manufacturers of the primary proposed equipment and software &mdash; specifically the HCI server platform, virtualization platform, and any bundled backup or management platform &mdash; shall have at least ten (10) years of proven experience in manufacturing, developing, and supplying similar enterprise infrastructure solutions, with successful deployment track records in Sri Lanka (e.g., national data centers, critical public sector, financial sector, or telecom environments). For open-source solutions, the platform shall have at least five (5) years of active development and demonstrated production deployments of comparable scale and complexity.</p><p>(iv) Technical Capacity: The Bidder shall demonstrate that it has, suitably qualified and experienced technical personnel for design, installation, configuration, testing, commissioning, migration, and ongoing support of:</p><ul><li>HCI platforms and enterprise server hardware</li><li>Virtualization systems and cluster management platforms</li><li>Softwaredefined storage</li><li>Directory services (Active Directory, LDAP, Kerberos, DNS)</li><li>Linux and Windows integration with centralized authentication</li><li>Enterprise backup and recovery environments</li><li>Highavailability and failover configurations</li></ul><p>The Bidder shall provide brief CVs or profiles of key technical staff (or key positions) covering these competencies.</p><p>(v) Financial Capacity:</p><p>a. The minimum required Average Annual Turnover (AAT) of the Bidder for the last three (3) financial years shall be not less than LKR 250 million.</p><p>b. The minimum amount of liquid assets and/or credit facilities, net of other contractual commitments, of the Bidder shall be not less than LKR 70 million.</p><p>eligible Bidders may obtain further information from <strong>Project Director</strong>, <strong>Climate Resilience Multiphase Programmatic Approach, No 11, Jawatta Road, Colombo 05, Sri Lanka TP +94112507855, +94112058451, Email: pdcresmpa@gmail.com</strong>&nbsp; and inspect the bidding document during office hours 9.00 am to 3.30 pm at the address given below or may be downloaded and reviewed from https://promise.lk/ and <u>https://meteo.gov.lk/</u> websites only for reference purpose.</p><p>5. &nbsp; The bidding document in the English language may be purchased by interested Bidders upon the submission of a written application to the address below and upon payment of a non-refundable fee of <strong>LKR</strong>. <strong>50,000.00</strong> <strong>from</strong><strong> July 24, </strong><strong>2026</strong> <strong>between 9.00 am to 3.30 pm</strong> on any working day. The method of payment will be Cash.</p><p>6. &nbsp; Bids must be delivered to the address below on or before <strong>August </strong><strong>13, 2026 </strong><strong>at 4.00 p.m.</strong> Electronic Bidding will not be permitted. Late Bids will be rejected. Bids will be publicly opened soon after closing in the presence of the bidders&rsquo; representatives who choose to attend.</p><p>7. &nbsp; All Bids must be accompanied by a <strong>Bid Security in the form of Bank Guarantee</strong>: <strong>LKR 4.0 million.</strong></p><p>8. &nbsp; A Pre-Bid Meeting will be arranged <strong>at 4:00 p.m. on July </strong><strong>30, 2026</strong> in the Conference Room at the address given below.</p><p>9.&nbsp;&nbsp; The address referred to above is <strong>Climate Resilience Multi-Phase Programmatic Approach, No.11, Jawatta Road, Colombo 05, Sri Lanka</strong></p><p><strong>Chairman,</strong></p><p><strong>Project Procurement Committee&nbsp; </strong></p><p>Climate Resilience Multi-Phase Programmatic Approach,</p><p>No.11, Jawatta Road, Colombo 05.</p><p>July 23, 2026</p>"},{"id":"OP00457950","notice_type":"Request for Expression of Interest","noticedate":"21-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-08-05T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P176371","project_name":"Eastern Africa Regional Statistics Program-for-Results","bid_reference_no":"TN-STATAFRIC - AUC-481115-CS-INDV","bid_description":"An Individual consultant to develop an integrated and digitalized information system with links at national, regional, and continental levels.","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Building C, 3rd Floor,\nP.O Box 3243, Roosevelt Street\nAddis Ababa, Ethiopia\nTel: +251 (0) 11 551 770","contact_ctry_name":"Tunisia","contact_email":"tender@africanunion.org","contact_name":"Hatem Elabidy","contact_organization":"African Union Commission","contact_phone_no":"+251 (0) 11 551 7700","contact_web_url":"https://au.int/en/bid/individual-consultant-ic-perform-consultancy-services-develop-integrated-and-digitalized-0","submission_date":"2026-07-21T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; INDIVIDUAL CONSULTANT)</strong></p><p>&nbsp;</p><p><strong>Name of Project: </strong>Eastern Africa Regional Statistics Program-for-Results (EARSPforR)</p><p><strong>Grant No</strong>: P176371</p><p><strong>Assignment Title: </strong>Individual Consultant (IC) to perform the Consultancy services to Develop an Integrated and Digitalized Statistical Information System for STATAFRIC.</p><p><strong>Reference No</strong>.TN-STATAFRIC-AUC-481115-CS-INDV.</p><p>&nbsp;</p><ol><li><strong><u>Background</u></strong></li></ol><p>The African Union (AU) is committed to strengthening African statistical systems across the continent to support evidence-based policy-making, regional integration, and sustainable development. African statistical systems encompass national statistical offices (NSOs), regional economic communities (RECs), and continental institutions. However, data management systems across these entities are frequently fragmented, heterogeneous, and insufficiently interoperable. These structural challenges constrain the efficient exchange, consolidation, and dissemination of reliable and timely statistics at the continental level</p><p>&nbsp;</p><p>Key challenges include:</p><ul><li>Lack of standardized data formats and metadata schemas across NSOs and RECs.</li><li>Weak or absent automated data exchange mechanisms between national and continental systems.</li><li>Limited data governance frameworks governing quality assurance and access management.</li><li>Inadequate tools for real-time data visualization and dissemination to end-users.</li><li>Insufficient technical capacity within STATAFRIC to manage and maintain digital platforms.</li></ul><p>To address these gaps, STATAFRIC intends to develop an integrated and digitalized statistical information system connecting national statistical systems, regional data platforms, and continental-level repositories. The system will support improved data collection, integration, analysis, and dissemination while ensuring interoperability and compliance with international statistical standards.</p><p>&nbsp;</p><p>STATAFRIC therefore seeks to recruit a qualified individual consultant to design, develop and implementation of this integrated digital statistical information system at STATAFRIC.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong><u>Objectives of the assignment</u></strong></li></ol><p>The consultancy specifically aims to:</p><p>&nbsp;</p><ol><li>Conduct a structured diagnostic assessment of existing data management systems and information flows at STATAFRIC and within key partner institutions.</li><li>Design a scalable, modular, and interoperable architecture for the integrated statistical information system.</li><li>Develop and deploy a functional digital platform incorporating data ingestion, integration, governance, visualization, and dissemination capabilities.</li><li>Establish secure and standards-compliant mechanisms for data exchange between NSOs, RECs, and STATAFRIC, developed in alignment and coordination with the parallel consultancy for the Continental Statistical Database (CSD), to ensure technical and data compatibility between the two systems.</li><li>Define and implement data governance policies, metadata management standards, and quality assurance procedures.</li><li>Build institutional capacity through structured training, technical documentation, and knowledge transfer.</li></ol><p>&nbsp;</p><ol><li><strong><u>Expected Deliverables</u></strong></li></ol><p>All deliverables must be submitted in English and/or French, as agreed with STATAFRIC. Deliverables are subject to review and approval by STATAFRIC management before payment of the corresponding instalment.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:537px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:50px; vertical-align:top; width:47px\"><p><strong>#</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:50px; vertical-align:top; width:169px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:50px; vertical-align:top; width:240px\"><p><strong>Description and Minimum Content</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:50px; vertical-align:top; width:81px\"><p><strong>Number of Days</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:47px\"><p>D1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:169px\"><p>Methodological report and inception Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:240px\"><p>Detailed methodology; work plan with milestones; stakeholder engagement strategy; risk register; tools and data sources to be used.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:81px\"><p>10 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:47px\"><p>D2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:169px\"><p>Diagnostic Assessment Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:240px\"><p>Documented review of existing systems; data flow maps; gap analysis across infrastructure, interoperability, security, and governance; prioritized system requirements; stakeholder consultation summary.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>System Architecture Design Document.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Architecture diagrams (high-level and component-level); technology stack with justification; data model and entity-relationship diagrams; integration architecture; security architecture; hosting strategy.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>30 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Prototype / Operational Platform.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Deployed and functional platform with all modules (see Section 3.3); UAT (User Acceptance Testing) report signed off by STATAFRIC; source code repository with documentation; deployment guide.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Data Exchange Framework &amp; Interoperability Guidelines.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Exchange protocols and standards documentation; API specifications and documentation; integration connectors for &ge;3 priority systems; testing and validation results.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Training Materials &amp; User Documentation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Training programme agenda; presentation materials and exercises; administrator manual; end-user manual; maintenance and sustainability plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>10 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Final Implementation Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Summary of all activities and outputs; lessons learned; recommendations for Phase 2 enhancements; handover checklist.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>10 days</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong><u>Required Qualifications and Experience</u></strong></li></ol><p>&nbsp;</p><ol><li><ol><li><strong><u>Academic Qualifications</u></strong></li></ol></li><li>An advanced university degree (Master&#39;s level minimum) in one of the following fields: Information Systems, Computer Science, Data Science, Statistics, or a closely related discipline.</li></ol><p>&nbsp;</p><ol><li><ol><li><strong><u>Professional Experience</u></strong></li></ol></li></ol><p><u>The following experience is required:</u></p><p>&nbsp;</p><ol><li>A minimum of ten (10) years of professional experience in the design, development, and implementation of large-scale information systems or data platforms.</li><li>Demonstrated experience in statistical information systems, open data platforms, or national/regional data management initiatives.</li><li>Proven experience in data interoperability, including the design of data exchange protocols, APIs, and automated pipelines.</li><li>Practical knowledge of metadata standards (SDMX, DDI, or equivalent) and data governance frameworks.</li><li>Experience conducting needs assessments and gap analyses in ICT or data management contexts.</li><li>Experience in capacity building, including the design and delivery of technical training for institutional users.</li></ol><p>&nbsp;</p><p><u>The following experience is <strong>an asset</strong>:</u></p><p>&nbsp;</p><ol><li>Prior experience with African Union institutions, regional economic communities, or national statistical offices in Africa.</li><li>Experience in cloud infrastructure management (AWS, Azure, GCP or equivalent).</li><li>Familiarity with international statistical standards frameworks (IMF SDDS, UN SDG data architecture, etc.).</li><li>Proficiency in both English and French.</li></ol><p>&nbsp;</p><ol><li><ol><li><strong><u>Technical Competencies</u></strong></li></ol></li></ol><p><u>Candidates should demonstrate proficiency in at least the following areas:</u></p><p>&nbsp;</p><ol><li>Database design and management (PostgreSQL, MySQL, or equivalent relational/NoSQL systems).</li><li>API development and web services (REST, SOAP).</li><li>ETL pipeline design and data transformation tools.</li><li>Data visualization tools (e.g., Power BI, Tableau, D3.js, or equivalent).</li><li>Security best practices for web-based information systems.</li><li>Version control and documentation (Git, Confluence, or equivalent).</li></ol><p>&nbsp;</p><ol><li><strong><u>Evaluation Criteria</u></strong></li></ol><p>Applications will be evaluated using the following evaluation criteria. Only candidates achieving a minimum technical <u>score of 70 out of 100</u> will be considered.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:42px\"><p><strong>No.</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:198px\"><p><strong>Evaluation Criterion</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:246px\"><p><strong>Sub-criteria</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:90px\"><p><strong>Max. Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Technical Approach &amp; Methodology.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Clarity, relevance, and feasibility of proposed approach; quality of work plan; understanding of assignment.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>25</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Relevant Professional Experience.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Depth and quality of experience in large-scale information systems and statistical data platforms.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>20</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Demonstrated Technical Competencies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Evidence of skills in key technical areas (databases, APIs, ETL, visualization, security).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>20</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Experience with International/Regional Organizations.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Prior work with AU, UN, RECs, NSOs, or equivalent bodies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>15</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Qualifications.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Academic qualifications and professional certifications relevant to the assignment.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>10</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\"><p>Language Proficiency.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:246px\"><p>Demonstrated proficiency in English and/or French (bilingual capacity an advantage).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>10</u></p></td></tr><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:23px; vertical-align:top; width:486px\"><p><strong>Minimum passing score: 70/100</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:23px; vertical-align:top; width:90px\"><p><strong><u>100</u></strong></p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong><u>Application (Expression of Interest) EoI requirements:</u></strong></li></ol><p>Interested candidates should submit the following documents:</p><p>&nbsp;</p><ol><li><u>A technical proposal</u> (maximum 15 pages) including: understanding of the assignment, proposed methodology, work plan, and relevant experience.</li><li><u>An updated curriculum vitae (CV)</u> highlighting relevant qualifications and experience, with at least three (3) professional references.</li><li><u>At least two (2) samples of similar work previously undertaken</u> (e.g., system architecture documents, diagnostic reports, or deployed platform documentation).</li><li><u>Copies of relevant academic and professional certificates</u>.</li></ol><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.</p><p>&nbsp;</p><p>The African Union Commission now invites eligible individuals (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Individual Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Individual Consultant<em> </em>selection method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours i.e. 0900 to 1700 hours.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form following the above shortlisting criteria to the address below (in person, or by mail) before <strong><u>05th August 2026</u></strong> at 15:00 Hours Local Time, Addis Ababa, Ethiopia.</p><p>&nbsp;</p><p>Only submitted Expression of Interests (EoIs) mentioning the reference number &ldquo;<strong><u>TN-STATAFRIC-AUC-481115-CS-INDV </u></strong>&ldquo; in the subject field of the e-mail, will be considered.</p><p>&nbsp;</p><p>African Union Commission,</p><p>Attn: Head, Supply Chain Management Division - Operations Support Services Directorate</p><p>Building C, 3rd Floor,</p><p>P.O Box 3243,<em>&nbsp;</em>Roosevelt Street</p><p>Addis Ababa, Ethiopia</p><p>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</p><p>Fax: +251 (0) 11 551 0442; +251 11-551-0430</p><p>E-mails: tender@africanunion.org</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Terms of Reference </strong></p><p>&nbsp;</p><p><strong>Individual Consultant (IC) to perform the Consultancy Services to develop an Integrated and Digitalized Statistical Information System for STATAFRIC.</strong></p><p>&nbsp;</p><ol><li><strong><u>Background and Context</u></strong></li></ol><p>The African Union (AU) is committed to strengthening African statistical systems across the continent to support evidence-based policy-making, regional integration, and sustainable development. African statistical systems encompass national statistical offices (NSOs), regional economic communities (RECs), and continental institutions. However, data management systems across these entities are frequently fragmented, heterogeneous, and insufficiently interoperable. These structural challenges constrain the efficient exchange, consolidation, and dissemination of reliable and timely statistics at the continental level.</p><p>&nbsp;</p><p>Key challenges include:</p><ul><li>Lack of standardized data formats and metadata schemas across NSOs and RECs.</li><li>Weak or absent automated data exchange mechanisms between national and continental systems.</li><li>Limited data governance frameworks governing quality assurance and access management.</li><li>Inadequate tools for real-time data visualization and dissemination to end-users.</li><li>Insufficient technical capacity within STATAFRIC to manage and maintain digital platforms.</li></ul><p>To address these gaps, STATAFRIC intends to develop an integrated and digitalized statistical information system connecting national statistical systems, regional data platforms, and continental-level repositories. The system will support improved data collection, integration, analysis, and dissemination while ensuring interoperability and compliance with international statistical standards.</p><p>&nbsp;</p><p>STATAFRIC therefore seeks to recruit a qualified individual consultant to design, develop and implementation of this integrated digital statistical information system at STATAFRIC.</p><p>&nbsp;</p><ol><li><strong><u>Objectives of the Consultancy</u></strong></li></ol><p>&nbsp;</p><ol><li><u>General Objectives:</u></li></ol><p>To design and implement an integrated and digitalized statistical information system for STATAFRIC that enables efficient, secure, and standards-compliant exchange, integration, and dissemination of official statistical data compiled and published by STATAFRIC from NSOs and RECs, across national, regional, and continental statistical systems. This assignment excludes internal administrative, accounting, logistics, or other non-statistical operational data used for STATAFRIC&#39;s day-to-day management.</p><p>&nbsp;</p><ol><li><u>Specific Objectives</u></li></ol><p>The consultancy services specifically aim to:</p><p>&nbsp;</p><ol><li>Conduct a structured diagnostic assessment of existing data management systems and information flows at STATAFRIC and within key partner institutions.</li><li>Design a scalable, modular, and interoperable architecture for the integrated statistical information system.</li><li>Develop and deploy a functional digital platform incorporating data ingestion, integration, governance, visualization, and dissemination capabilities.</li><li>Establish secure and standards-compliant mechanisms for data exchange between NSOs, RECs, and STATAFRIC, developed in alignment and coordination with the parallel consultancy for the Continental Statistical Database (CSD), to ensure technical and data compatibility between the two systems.</li><li>Define and implement data governance policies, metadata management standards, and quality assurance procedures.</li><li>Build institutional capacity through structured training, technical documentation, and knowledge transfer.</li></ol><p>&nbsp;</p><ol><li><strong><u>Scope of Work</u></strong></li></ol><p>The consultant will carry out the following tasks:</p><p>&nbsp;</p><ol><li><strong>Diagnostic Assessment.</strong></li></ol><p>The consultant will undertake a comprehensive assessment of the existing statistical information landscape, including:</p><p>&nbsp;</p><ol><li>Review and document the current data management systems, databases, and digital tools in use at STATAFRIC and at a representative sample of NSOs and RECs.</li><li>Map existing data flows including submission mechanisms, formats, frequencies, and governance arrangements (aligned with the work of Specialized Technical Groups (STGs)) between national, regional, and continental actors.</li><li>Identify critical gaps in infrastructure, data interoperability, security protocols, and governance frameworks.</li><li>Assess the technical readiness of STATAFRIC&#39;s ICT environment (servers, network infrastructure, software stack, connectivity).</li><li>Map key stakeholders involved in the production, management, and dissemination of statistical data for a defined set of priority thematic areas and indicators (based on SHaSA 2) and as recommended by Specialized Technical Groups (STGs).</li><li>Produce a prioritized list of system requirements, covering both software and hardware/infrastructure needs, informed by stakeholder consultations.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>System Architecture Design. </strong></li></ol><p>Based on the diagnostic findings, the consultant will:</p><p>&nbsp;</p><ol><li>Design comprehensive and modular architecture for the integrated statistical information system, specifying all major system components, both software/application components and underlying hardware/infrastructure components, and their interactions.</li><li>Define technical specifications for each system component, including:<ul><li>Data ingestion mechanisms (automated feeds, manual submission portals, API connectors).</li><li>Data integration and transformation services (ETL pipelines, harmonization rules).</li><li>Metadata management tools aligned with SDMX or equivalent international standards.</li><li>Data storage infrastructure (database design, cloud or hybrid hosting strategy).</li><li>Analytical processing and data visualization modules, enabling STATAFRIC staff and authorized users to explore, analyze, and visualize statistical data.</li><li>System monitoring, logging, and observability layer, to supervise system health, performance, and availability.</li><li>User access and identity management layer.</li></ul></li><li>Ensure the architecture is compatible with international standards for statistical data exchange, including SDMX, DDI, and relevant AU/STATAFRIC frameworks, as well as full interoperability with the Continental Statistical Database (CSD) currently under development.</li><li>Define a technology stack justification, specifying recommended open-source or proprietary tools with rationale.</li><li>Include data flow diagrams, entity-relationship diagrams, and integration architecture diagrams.</li></ol><p>&nbsp;</p><ol><li><strong>Development of the Digital Platform. </strong></li></ol><p>The consultant will develop and deploy a functional operational platform including the following modules:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:168px\"><p>Module</p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:29px; vertical-align:top; width:360px\"><p>Required Functionalities</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>Data Submission &amp; Validation</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>Web-based submission portal; automated format validation; error flagging and feedback to data providers; support for batch uploads and API-based ingestion.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>Data Transformation &amp; Integration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>Configurable ETL pipelines; data harmonization and unit standardization; conflict detection and resolution workflows; audit trail for all transformations.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>Metadata Management</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>Metadata registry aligned with SDMX; variable-level documentation; versioning; linkage between datasets and their metadata.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>Access &amp; Identity Management</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>Role-based access control (RBAC); multi-factor authentication; user activity logging; tiered data access (public, institutional, restricted).</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>Data Visualization &amp; Dissemination</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>Interactive dashboards with filtering and drill-down; exportable charts and tables; public-facing data portal; API for third-party data consumers.</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:168px\"><p><strong>System Administration</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:360px\"><p>User and permission management interface; monitoring and alerting dashboard; backup and recovery management tools.</p></td></tr></tbody></table><p>&nbsp;</p><p>The platform must be designed for scalability (capable of onboarding all 55 AU member states), high availability (target uptime &ge; 99.5%), and maintainability by STATAFRIC technical staff post-deployment.</p><p>&nbsp;</p><ol><li><strong>Interoperability and Data Exchange. </strong></li></ol><p>&nbsp;</p><ol><li>Design and document secure data exchange protocols between NSOs, RECs, and STATAFRIC, specifying authentication mechanisms, encryption standards, and data transfer formats.</li><li>Develop RESTful APIs or automated data pipelines for programmatic data transmission, including API documentation and sandbox testing environment.</li><li>Ensure full compliance with international statistical data exchange standards (SDMX, JSON-stat, CSV-W or equivalent).</li><li>Define and test integration connectors for at least three (3) priority NSO or RECs systems identified during the diagnostic phase, selecting a mix of high-performing and middle-performing NSOs to ensure connectors are validated against realistic field challenges and varying levels of statistical and technical capacity.</li></ol><p>&nbsp;</p><ol><li><strong>Security and Data Governance. </strong></li></ol><ol><li>Develop a data security policy covering data classification, encryption at rest and in transit, vulnerability management, and incident response.</li><li>Implement role-based access control (RBAC) and define user roles, permissions, and access tiers for all system modules.</li><li>Design a data governance framework specifying data ownership, stewardship responsibilities, quality assurance procedures, and data lifecycle management.</li><li>Ensure compliance with applicable data protection regulations and AU data sovereignty principles.</li><li>Define and implement data quality indicators and automated quality checks within the platform.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Capacity Building and Knowledge Transfer. </strong></li></ol><ol><li>Develop a structured training programme for STATAFRIC technical staff covering system administration, data management, and basic troubleshooting.</li><li>Conduct hands-on training sessions (minimum two sessions) targeted at STATAFRIC technical staff and relevant technical stakeholders from NSOs and RECs who have the requisite IT/data management background to effectively absorb this technical training.</li><li>Produce comprehensive technical documentation, including system architecture documents, installation and configuration guides, administrator manual, and end-user manual.</li><li>Develop a system maintenance and sustainability plan, including recommended staffing profile, estimated annual maintenance costs, and upgrade roadmap for Years 2&ndash;3.</li></ol><p>&nbsp;</p><ol><li><strong><u>Expected Deliverables</u></strong></li></ol><p>All deliverables must be submitted in English and/or French, as agreed with STATAFRIC. Deliverables are subject to review and approval by STATAFRIC management before payment of the corresponding instalment.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:537px\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:47px\"><p><strong>#</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:169px\"><p><strong>Deliverable</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:240px\"><p><strong>Description and Minimum Content</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:37px; vertical-align:top; width:81px\"><p><strong>Number of Days</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:47px\"><p>D1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:169px\"><p>Methodological report, this should be after the submission of an inception report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:240px\"><p>Detailed methodology; work plan with milestones; stakeholder engagement strategy; risk register; tools and data sources to be used.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:68px; vertical-align:top; width:81px\"><p>10 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:47px\"><p>D2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:169px\"><p>Diagnostic Assessment Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:240px\"><p>Documented review of existing systems; data flow maps; gap analysis across infrastructure, interoperability, security, and governance; prioritized system requirements; stakeholder consultation summary.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:83px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>System Architecture Design Document.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Architecture diagrams (high-level and component-level); technology stack with justification; data model and entity-relationship diagrams; integration architecture; security architecture; hosting strategy.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>30 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Prototype / Operational Platform.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Deployed and functional platform with all modules (see Section 3.3); UAT (User Acceptance Testing) report signed off by STATAFRIC; source code repository with documentation; deployment guide.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Data Exchange Framework &amp; Interoperability Guidelines.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Exchange protocols and standards documentation; API specifications and documentation; integration connectors for &ge;3 priority systems; testing and validation results.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>20 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Training Materials &amp; User Documentation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Training programme agenda; presentation materials and exercises; administrator manual; end-user manual; maintenance and sustainability plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>10 days</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:47px\"><p>D7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:169px\"><p>Final Implementation Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:240px\"><p>Summary of all activities and outputs; lessons learned; recommendations for Phase 2 enhancements; handover checklist.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:9px; vertical-align:top; width:81px\"><p>10 days</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong><u>Institutional Arrangements</u></strong></li></ol><p>&nbsp;</p><ol><li>The consultant will be based in Tunis, Tunisia, and will work under the direct supervision of&nbsp; STATAFRIC World Bank project coordinator. Relocation costs are not covered for this assignment, however, STATAFRIC will provide for a return air-ticket in accordance with the AU travel rules.</li><li>Day-to-day coordination will be managed through a designated STATAFRIC technical focal point, who will facilitate access to relevant staff, systems, and documentation.</li><li>The consultant will collaborate closely with relevant departments of the African Union Commission (AUC) and with NSOs/RECs as required by the scope of work.</li><li>Progress reviews will be conducted at the end of each month. The consultant will present key findings and outputs at designated review meetings.</li><li>STATAFRIC will provide access to existing documentation, relevant infrastructure, and introductions to key stakeholder counterparts.</li><li>Travel costs for field missions, if required, will be covered by STATAFRIC in accordance with AU travel rules, subject to prior written approval.</li></ol><p>&nbsp;</p><ol><li><strong><u>Required Qualifications and Experience</u></strong></li></ol><p>&nbsp;</p><ol><li><strong><u>Academic Qualifications:</u></strong></li></ol><p>An advanced university degree (Master&#39;s level minimum) in one of the following fields: Information Systems, Computer Science, Data Science, Statistics, or a closely related discipline.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong><u>Professional Experience:</u></strong></li></ol><p>&nbsp;</p><p><u>The following experience is required:</u></p><ol><li>A minimum of ten (10) years of professional experience in the design, development, and implementation of large-scale information systems or data platforms.</li><li>Demonstrated experience in statistical information systems, open data platforms, or national/regional data management initiatives.</li><li>Proven experience in data interoperability, including the design of data exchange protocols, APIs, and automated pipelines.</li><li>Practical knowledge of metadata standards (SDMX, DDI, or equivalent) and data governance frameworks.</li><li>Experience conducting needs assessments and gap analyses in ICT or data management contexts.</li><li>Experience in capacity building, including the design and delivery of technical training for institutional users.</li></ol><p><u>The following experience is an asset:</u></p><ol><li>Prior experience with African Union institutions, regional economic communities, or national statistical offices in Africa.</li><li>Experience in cloud infrastructure management (AWS, Azure, GCP or equivalent).</li><li>Familiarity with international statistical standards frameworks (IMF SDDS, UN SDG data architecture, etc.).</li><li>Proficiency in both English and French.</li></ol><p>&nbsp;</p><ol><li><strong><u>Technical Competencies:</u></strong></li></ol><p><u>Candidates should demonstrate proficiency in the following areas:</u></p><ol><li>Database design and management (PostgreSQL, MySQL, or equivalent relational/NoSQL systems).</li><li>API development and web services (REST, SOAP).</li><li>ETL pipeline design and data transformation tools.</li><li>Data visualization tools (e.g., Power BI, Tableau, D3.js, or equivalent).</li><li>Security best practices for web-based information systems.</li><li>Version control and documentation (Git, Confluence, or equivalent).</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong><u>Evaluation Criteria</u></strong></li></ol><p>Applications will be evaluated using the following evaluation criteria. Only candidates achieving a minimum technical score of 70 out of 100 will be considered.</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse\"><tbody><tr><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:42px\"><p><strong>No.</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:186px\"><p><strong>Evaluation Criterion</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:258px\"><p><strong>Sub-criteria</strong></p></td><td style=\"background-color:#f2f2f2; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:22px; vertical-align:top; width:90px\"><p><strong>Max. Points</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Technical Approach &amp; Methodology.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Clarity, relevance, and feasibility of proposed approach; quality of work plan; understanding of assignment.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>25</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Relevant Professional Experience.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Depth and quality of experience in large-scale information systems and statistical data platforms.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>20</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Demonstrated Technical Competencies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Evidence of skills in key technical areas (databases, APIs, ETL, visualization, security).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>20</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Experience with International/Regional Organizations.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Prior work with AU, UN, RECs, NSOs, or equivalent bodies.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>15</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Qualifications.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Academic qualifications and professional certifications relevant to the assignment.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>10</u></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\"><ol><li>&nbsp;</li></ol></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:186px\"><p>Language Proficiency.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:258px\"><p>Demonstrated proficiency in English and/or French (bilingual capacity an advantage).</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:90px\"><p><u>10</u></p></td></tr><tr><td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:23px; vertical-align:top; width:486px\"><p><strong>Minimum passing score: 70/100</strong></p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:23px; vertical-align:top; width:90px\"><p><strong><u>100</u></strong></p></td></tr></tbody></table><p>&nbsp;</p><ol><li><strong><u>Application Requirements</u></strong></li></ol><p>Interested individual consultants should submit the following documents as a single application package:</p><ol><li><u>A technical proposal (maximum 15 pages)</u> including: understanding of the assignment, proposed methodology, work plan, and relevant experience.</li><li><u>An updated curriculum vitae (CV)</u> highlighting relevant qualifications and experience, with at least three (3) professional references.</li><li><u>At least two (2) samples of similar work previously undertaken</u> (e.g., system architecture documents, diagnostic reports, or deployed platform documentation).</li><li><u>Copies of relevant academic and professional certificates</u>.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong><u>Terms of Payment</u></strong></li></ol><p>Payments will be made in several instalments depending on the completion and STATAFRIC&rsquo;s approvals of the deliverables:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:100.0%\"><tbody><tr><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:5%\"><p><strong>#</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:27%\"><p><strong>Deliverables</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:44%\"><p><strong>Description and Minimum Content</strong></p></td><td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:22%\"><p><strong>Remuneration Percentage (%)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:76px; vertical-align:top; width:5%\"><p>D1</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:76px; vertical-align:top; width:27%\"><p><strong>Methodological report</strong>, this should be after the submission of an inception report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:76px; vertical-align:top; width:44%\"><p>Detailed methodology; work plan with milestones; stakeholder engagement strategy; risk register; tools and data sources to be used.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:76px; vertical-align:bottom; width:22%\"><p>10%</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D2</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>Diagnostic Assessment Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Documented review of existing systems; data flow maps; gap analysis across infrastructure, interoperability, security, and governance; prioritized system requirements; stakeholder consultation summary.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>15%</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D3</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>System Architecture Design Document.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Architecture diagrams (high-level and component-level); technology stack with justification; data model and entity-relationship diagrams; integration architecture; security architecture; hosting strategy.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>25%</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D4</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>Prototype / Operational Platform.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Deployed and functional platform with all modules (see Section 3.3); UAT (User Acceptance Testing) report signed off by STATAFRIC; source code repository with documentation; deployment guide.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>15%</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D5</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>Data Exchange Framework &amp; Interoperability Guidelines.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Exchange protocols and standards documentation; API specifications and documentation; integration connectors for &ge;3 priority systems; testing and validation results.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>15%</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D6</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>Training Materials &amp; User Documentation.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Training programme agenda; presentation materials and exercises; administrator manual; end-user manual; maintenance and sustainability plan.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>10%</p><p>&nbsp;</p><p>&nbsp;</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:5%\"><p>D7</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:27%\"><p>Final Implementation Report.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:44%\"><p>Summary of all activities and outputs; lessons learned; recommendations for Phase 2 enhancements; handover checklist.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:bottom; width:22%\"><p>10%</p><p>&nbsp;</p><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p>"},{"id":"OP00456646","notice_type":"Request for Expression of Interest","noticedate":"14-Jul-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-07-29T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P180117","project_name":"Building Institutions And Systems to Harness And Realize Agenda 2063 Project","bid_reference_no":"ET-AUC-560866-CS-QCBS","bid_description":"CONSULTANCY SERVICES TO CONDUCT IT SECURITY ASSESSMENT FOR AFRICA UNION COMMISSION","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"Chenga-Bwalyak@AfricanUnion.org","contact_name":"Kaputo Chenga -Bwalya","contact_organization":"Africa Union Commission","contact_phone_no":"+251982168552","submission_date":"2026-07-14T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRM SELECTION)</strong></p><p>&nbsp;</p><p><strong>Country: </strong>Ethiopia</p><p><strong>Name of Project: </strong>The Building Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</p><p><strong>Grant No</strong>: P180117</p><p><strong>Assignment Title:</strong> Consultancy Services to Conduct IT Security Assessment for Africa Union Commission</p><p>&nbsp;</p><p><strong>Reference No</strong>. ET-AUC-560866-CS-QCBS</p><p>&nbsp;</p><p>The African Union Commission has received financing from the World Bank toward the cost of <em>The Building</em><em> Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project</em> and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) include conducting a comprehensive penetration testing assessment of the African Union Commission&rsquo;s ICT infrastructure. The engagement is designed to rigorously evaluate technical controls, identify vulnerabilities, and simulate realistic cyberattack scenarios.</p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.</p><p>&nbsp;</p><p>The African Union Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><p>&nbsp;</p><ul><li>Legally registered consulting firm with at least 7+ years of experience in cybersecurity and digital risk advisory.</li><li>Demonstrated expertise in penetration testing, vulnerability assessment, and technical security evaluation for large, complex ICT environments.</li><li>Ability to deliver actionable, evidence-based recommendations to strengthen ICT resilience and mitigate sophisticated cyber threats.</li><li>Proven experience working with governmental, regulatory, or large enterprise environments.</li><li>Experience in comparable geographic or sectoral contexts is an advantage.</li><li>Capability to deliver strategic, actionable, and operationally relevant recommendations.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Consultants&rsquo; Quality and Cost-based Selection method set out in the Procurement Regulations.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours <em>0900 to 1700 hours</em>.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>29 July 2026</strong>.</p><p>&nbsp;</p><p>African Union Commission,</p><p>Head of Supply Chain Management Division</p><p>Building C, 3rd Floor,</p><p>P.O Box 3243,<em>&nbsp;</em>Roosevelt Street</p><p>Addis Ababa, Ethiopia</p><p>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305</p><p>Fax: +251 (0) 11 551 0442; +251 11-551-0430</p><p>E-mail: Tender@africanunion.org</p><p>&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p><strong>CONSULTANCY SERVICES TO CONDUCT IT SECURITY ASSESSMENT FOR AFRICA UNION COMMISSION</strong></p><p>&nbsp;</p><p><strong>REF: ET-AUC-560866-CS-QCBS</strong></p><ul><li><strong>I. </strong><strong>Background</strong></li></ul><p>&nbsp;</p><p>As the continental organization mandated to advance integration, peace, and sustainable development across Africa, the African Union Commission (AUC) increasingly relies on sophisticated Information and Communication Technology (ICT) systems to execute its mandate with efficiency, reliability, and accountability. The Commission&rsquo;s ICT ecosystem, spanning headquarters and regional offices, integrates interconnected networks, mission-critical applications, and distributed services that are essential to achieving its operational and strategic priorities. While this digital transformation has significantly enhanced connectivity, efficiency, and service delivery, it has also introduced a complex and evolving landscape of cybersecurity risks.</p><p>In the current threat environment, cyber risks are not solely technical challenges; they carry strategic implications for institutional integrity, governance, and stakeholder trust. Safeguarding the AUC&rsquo;s ICT assets is therefore a matter of organizational resilience, credibility, and confidence &mdash; core enablers for the Commission to effectively deliver its continental mandate.</p><p>&nbsp;</p><p>The Management Information System Directorate (MISD), operating under the Cabinet of the Deputy Chairperson, is responsible for planning, deploying, and managing all ICT functions across the African Union.&nbsp; In its commitment to strengthening institutional cyber resilience, MISD recognizes the need for an independent, evidence-based Security Assessment of its ICT environment. This assessment will identify vulnerabilities, evaluate the effectiveness of existing safeguards, and provide actionable guidance to reinforce ICT security across all operational fields.</p><p>Accordingly, the African Union Commission invites proposals from highly qualified cybersecurity firms to conduct a comprehensive Security Assessment, incorporating both external and internal penetration testing. The assessment will simulate realistic cyber-threat scenarios, evaluate technical and operational resilience, and deliver prioritized recommendations for remediation. The outcomes will provide the Commission with a clear, actionable, and strategic understanding of its cybersecurity posture, supporting informed decision-making, strengthened operational continuity, and sustained institutional trust.</p><p>The main objectives of this Security Assessment will result in:</p><ul><li>Identify critical vulnerabilities and attack paths across external-facing and internal ICT infrastructure, including misconfigurations, weak authentication mechanisms, and privilege escalation opportunities.</li><li>Strengthen organizational resilience to cyber threats by identifying exploitable vulnerabilities and simulating realistic attack scenarios, enabling the Commission to anticipate, withstand, respond to, and recover from potential incidents with minimal operational disruption.</li><li>Enhance the effectiveness of technical security controls by systematically evaluating networks, systems, applications, and configurations against recognized standards and international best practices.</li><li>Assess potential business and operational impacts of security breaches to provide leadership with clear insights into risk exposure and informed prioritization for remediation.</li><li>Provide prioritized, actionable recommendations for remediation, ensuring that targeted measures effectively reduce exposure, mitigate risks, and strengthen defenses across the Commission&rsquo;s ICT environment.</li><li>Support continuous monitoring and improvement, delivering strategic insights that enable the MISD to maintain adaptive, resilient, and sustainable security measures over time.</li><li>Build confidence among stakeholders by producing high quality, evidence-based reporting suitable for leadership, technical teams, and external partners, fostering transparency and trust in the Commission&rsquo;s security posture.</li></ul><p>&nbsp;</p><ul><li><strong>II. </strong><strong>A Precise Statement of Objective or Purpose</strong></li></ul><p>&nbsp;</p><p>The consultancy will develop a structured, actionable IT Security Remediation Plan based on the findings of a comprehensive penetration testing assessment of the African Union Commission&rsquo;s ICT infrastructure. The plan will be multiannual, operational, and include prioritized initiatives with clearly assigned accountable owners, fully aligned with the Commission&rsquo;s ICT governance framework and operational priorities. It will integrate targeted remediation measures, evidence-based recommendations, and a detailed implementation roadmap to strengthen the resilience and protection of critical ICT systems and services.</p><p>The firm will conduct a thorough penetration testing engagement, employing both external (black box) and internal (white box) methodologies. The assessment will systematically identify exploitable vulnerabilities, evaluate the effectiveness of existing technical controls, and simulate realistic threat scenarios across networks, servers, applications, and configurations. The outcomes will provide the Commission with actionable insights to guide the development and operationalization of a practical remediation plan.</p><p>The Security Assessment aims to deliver actionable insights that will:</p><ol><li>Identify exploitable vulnerabilities across ICT systems including networks, servers, applications, and configurations revealing weaknesses that could be leveraged by malicious actors.</li><li>Simulate realistic cyberattack scenarios reflecting both external and insider threats, providing a clear understanding of the Commission&rsquo;s security posture under operational conditions.</li><li>Evaluate the effectiveness of existing technical security controls, including detection, prevention, and response mechanisms.</li><li>Determine potential business and operational impacts of successful exploitation, enabling leadership to prioritize risk mitigation based on strategic and operational importance.</li><li>Provide prioritized, actionable recommendations for remediation, mitigation, and risk reduction, fully aligned with internationally recognized cybersecurity standards and best practices.</li><li>Support organizational resilience and continuous improvement, enabling MISD to enhance monitoring, governance, and long-term cybersecurity maturity.</li></ol><p>&nbsp;</p><ul><li><strong>III. </strong><strong>Scope of Work or Service</strong></li></ul><p>&nbsp;</p><p>Under the leadership of the MISD Director, the consultancy will conduct a comprehensive penetration testing assessment of the African Union Commission&rsquo;s ICT infrastructure. The engagement is designed to rigorously evaluate technical controls, identify vulnerabilities, and simulate realistic cyberattack scenarios. The assessment will be tailored to the Commission&rsquo;s operational context, system architecture, regulatory environment, and threat landscape. At a minimum, the firm will prepare and execute the following:</p><ol><li>Planning and Scoping Phase</li></ol><ul><li>Agree on rules of engagement (RoE), testing windows, and communication protocols</li><li>Develop a penetration testing methodology consistent with recognized industry practices (e.g., OWASP, NIST, PTES, etc.) and tailored to AU requirements.</li></ul><ol><li>Situational Assessment</li></ol><ul><li>Review existing technical security controls, network architecture, and system configurations</li><li>Identify critical ICT assets, systems, and services, including external-facing services and internal infrastructure</li><li>Assess current detection, prevention, and response capabilities</li><li>Perform a threat landscape analysis relevant to AU operations</li><li>Identify technical or operational constraints that could impact assessment or remediation efforts</li></ul><p>&nbsp;</p><ol><li>Vulnerability and Risk Assessment</li></ol><ul><li>Conduct a cyber risk assessment (qualitative and/or quantitative where feasible).</li><li>Execute penetration testing (external black box and internal white box).</li><li>Identify vulnerabilities, classify by severity (Critical/High/Medium/Low), and map exploitable attack paths.</li><li>Evaluate systemic weaknesses and potential escalation paths.</li><li>Assess risks related to third-party systems or supply chain dependencies.</li><li>Review legal and regulatory compliance obligations.</li><li>Determine potential business and operational impacts of successful exploitation.</li></ul><p>&nbsp;</p><ol><li>Testing and Evaluation</li></ol><ul><li>Simulate realistic cyberattack scenarios reflecting external threats and insider risks.</li><li>Evaluate the effectiveness of technical controls across networks, servers, applications, and configurations.</li><li>Measure the resilience of critical systems and incident response mechanisms.</li><li>Document all findings in a structured, evidence-based report.</li></ul><p>&nbsp;</p><ol><li>Recommendations and Remediation Roadmap</li></ol><ul><li>Develop prioritized, actionable recommendations for remediation and risk reduction.</li><li>Propose technical improvements, configuration changes, and monitoring enhancements.</li><li>Deliver a detailed remediation roadmap with sequencing, dependencies, and assigned responsible owners.</li><li>Provide indicative resource and budget estimates for critical remediation measures.</li></ul><p>&nbsp;</p><ol><li>Reporting and Stakeholder Engagement</li></ol><ul><li>Prepare draft and final assessment reports, including executive summaries, technical findings, and visualizations.</li><li>Conduct presentation/workshop sessions with MISD and leadership teams to review findings and recommendations.</li><li>Incorporate stakeholder feedback to finalize the security assessment report.</li></ul><p>&nbsp;</p><ul><li><strong>IV. </strong><strong>Deliverables and Schedule for Completion of Tasks</strong></li></ul><p>&nbsp;</p><p>The estimated duration of this assignment is <strong>approximately 5 months</strong>, covering <strong>15 weeks at the African Union Commission Headquarters and 2 weeks and 2 days at each of the three remote AU regional offices (selected by the MIS Directorate)</strong>. All deliverables shall be clear, well-structured, and actionable, supporting practical implementation and informed decision-making. Deliverables shall include visual elements such as vulnerability heat maps, dashboards, and executive summaries to enhance clarity and facilitate prioritization of mitigation measures. Each deliverable shall be submitted in both draft and final versions and presented in formats agreed with the African Union, including but not limited to Word and PowerPoint</p><p>&nbsp;</p><p>The firm will provide the following deliverables:</p><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:630px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid #7f7f7f; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:49px\"><p><strong>Deliverables / reports</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #7f7f7f; border-left:none; border-right:1px solid black; border-top:1px solid black; height:49px\"><p><strong>Content of reports</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #7f7f7f; border-left:none; border-right:1px solid black; border-top:1px solid black; height:49px; width:160px\"><p><strong>Timeline</strong></p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Inception report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Detailed methodology, rules of engagement, testing windows, work plan, stakeholder map, communication plan, identification of dependencies, potential risks, and mitigation measures. Approved work plan will serve as the monitoring and coordination framework for the assignment.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within the first 10 business days after the start of the consultancy</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Penetration testing and risk assessment report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>A structured report detailing the results of the penetration testing assessment (external black box and internal white box). Includes identification of vulnerabilities classified by severity, technical and systemic weaknesses, potential escalation paths, third-party risks, and potential business or operational impacts.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within 30 business days after approval of the Inception Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Threat landscape and technical evaluation report</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Assessment of relevant cyber threats (external and insider risks), evaluation of existing technical controls, detection, prevention, and response capabilities, and identification of potential gaps affecting ICT resilience.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within 30 business days after approval of the Inception Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Draft remediation and action plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Prioritized, actionable recommendations for remediation and risk mitigation. Includes detailed remediation roadmap, sequencing, dependencies, responsible owners, and indicative resource/budget estimates for critical corrective actions.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within 25 business days after approval of the Penetration Testing and Risk Assessment Report</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Final security assessment and remediation plan</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Consolidated final report incorporating stakeholder feedback, including executive summary, detailed technical findings, and the finalized remediation RoadMap for operationalization.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within 10 business days after approval of the Draft Remediation and Action Plan</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Presentation to leadership / steering committee</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Executive-level presentation of key findings, insights, risk implications, and proposed remediation roadmap. Facilitation of discussions and alignment with MISD and leadership teams.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>After approval of the Final Security Assessment and Remediation Plan</p></td></tr><tr><td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none\"><p>Technical Handover and Final Reporting</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none\"><p>Handover of all assessment outputs, including detailed technical findings, evidence of vulnerabilities, remediation recommendations, and practical guidance for the Commission&rsquo;s ICT teams. Ensures the MISD can act on findings, monitor progress, and sustain improvements in ICT security posture.</p></td><td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; width:160px\"><p>Within 15 business days after approval of the Final Security Assessment and Remediation Plan</p></td></tr></tbody></table><p>&nbsp;</p><ul><li><strong>V. </strong><strong>Data, Services, and facilities to be provided by the Client: </strong></li></ul><p>The African Union Commission (AUC) will provide the following support to facilitate the consultancy:</p><ol><li>Access to Relevant Documentation and Information</li><li>Access to Key Personnel and Stakeholders</li></ol><ol><li><strong>Reporting Requirements</strong></li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"border-collapse:collapse; width:632px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; height:.5in\"><p><strong>Report / Deliverable</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; height:.5in\"><p><strong>Format</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; height:.5in\"><p><strong>Number of Copies</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; height:.5in\"><p><strong>Recipients</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p><strong>Inception Report</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>2 Hard Copies + 1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Senior Leadership,<br />MIS Director,<br />Cybersecurity Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p><strong>Interim Progress Reports</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>MIS Director,<br />Cybersecurity Team,<br />IT Governance Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p><strong>Penetration Testing and Risk Assessment Report</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>1 Electronic for each report</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>MIS Director, Cybersecurity Team, IT Governance Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p><strong>Threat Landscape and Technical Evaluation Report</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:69px\"><p>MIS Director, Cybersecurity Team, IT Governance Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p><strong>Draft Security Assessment and Remediation Plan</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>MIS Director,<br />Cybersecurity Team,<br />IT Governance Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p><strong>Final Security Assessment and Remediation Plan</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>3 Hard Copies + 1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Senior Leadership,<br />MIS Director,<br />Cybersecurity Team</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:92px\"><p><strong>Presentation of Findings</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:92px\"><p>PowerPoint / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:92px\"><p>1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:92px\"><p>Senior Leadership,<br />MIS Director,<br />Cybersecurity Team,<br />Relevant Stakeholders</p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p><strong>Knowledge Transfer and Handover Report</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>Word / PDF</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>1 Electronic</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:70px\"><p>MIS Director,<br />Cybersecurity Team,<br />IT Governance Team</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><ol><li>&nbsp;</li><li><strong>Consultant&rsquo;s Qualifications, Experience Requirements and Consultant&rsquo;s Team Composition with Estimate of Key Experts Input.</strong></li></ol><p>The successful consultancy firm must demonstrate a strong focus on cybersecurity strategy, risk management, and organizational value delivery, particularly within intergovernmental or large-scale institutional contexts.</p><p><strong>Firm Requirements:</strong></p><ul><li>Legally registered consulting firm with at least 7+ years of experience in cybersecurity and digital risk advisory.</li><li>Demonstrated expertise in penetration testing, vulnerability assessment, and technical security evaluation for large, complex ICT environments.</li><li>Ability to deliver actionable, evidence-based recommendations to strengthen ICT resilience and mitigate sophisticated cyber threats.</li><li>Proven experience working with governmental, regulatory, or large enterprise environments.</li><li>Experience in comparable geographic or sectoral contexts is an advantage.</li><li>Capability to deliver strategic, actionable, and operationally relevant recommendations.</li></ul><p>&nbsp;</p><p><strong>Consultancy Team Experience</strong></p><ul><li>At least one team member with a BSc in Computer Science, Cybersecurity, Information Security, or a closely related discipline; advanced offensive security certifications (e.g., OSCP, CEH, GPEN) are a strong advantage.</li><li>A minimum of five (5) to seven (7) years of relevant professional experience in penetration testing, ethical hacking, or offensive cybersecurity operations.</li><li>Proven capability to conduct comprehensive penetration testing engagements across both external and internal enterprise-scale environments.</li><li>Advanced technical expertise in assessing networks, systems, and applications, including identification, validation, and exploitation of security vulnerabilities.</li><li>Demonstrated experience in mapping credible attack paths, including privilege escalation, lateral movement, and persistence within complex infrastructures.</li><li>Experience in at least three (3) comparable assignments involving penetration testing or technical security assessments for large organizations, public institutions, or international entities.</li><li>Ability to operate effectively in sensitive and high-security environments, maintaining strict adherence to rules of engagement, confidentiality, and operational safeguards.</li><li>Strong leadership, collaboration, and communication skills to engage effectively with stakeholders.</li><li>Experience in at least one government or international organization project in cybersecurity or digital transformation, including drafting or implementing strategies.</li><li>The firm must have offices in an African Union member state.</li></ul><p>&nbsp;</p><ol><li><strong>Client&rsquo;s Assignment management arrangement: </strong></li></ol><ul><li>The MIS Directorate will oversee the assignment to ensure alignment with governance objectives, compliance, and timely completion. This includes reviewing reports, providing guidance, and approving deliverables.</li></ul><ul><li>The Cybersecurity expert will supervise day-to-day consultancy activities.</li><li>Reports should be submitted during the course of the project</li></ul><ul><li>Per the deliverables and schedule for completion of tasks section above.</li><li>Monthly activity updates</li></ul><ul><li>The MIS Director will validate final reports.</li></ul><p>&nbsp;</p><ol><li><strong>List Of Indicative Key Professional Positions Whose CVs And Experience Would Be Evaluated.&nbsp; </strong></li></ol><table cellspacing=\"0\" style=\"border-collapse:collapse; width:639px\"><tbody><tr><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf\"><p><strong>S. No</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf\"><p><strong>Key Position</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:167px\"><p><strong>Area of Specific Expertise Required</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:192px\"><p><strong>Minimum Qualification and Professional Exp&eacute;rience</strong></p></td><td style=\"background-color:#d0cece; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:123px\"><p><strong>Indicative Key Staff Input (Person-Months)</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>1</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Team Lead / Cybersecurity Assessment Expert</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Overall leadership of security assessment, governance, quality assurance, and coordination of penetration testing activities</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>10+ years in cybersecurity, including at least 4 years leading penetration testing or security assessment engagements in complex environments</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>5 months</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>2</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Lead Penetration Tester / Red Team Specialist</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Advanced penetration testing, ethical hacking, exploitation techniques, attack simulation (external and internal)</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>7+ years in cybersecurity with at least 5 years of hands-on penetration testing experience across networks, systems, and applications</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>4&ndash;5 months</strong> <em>(intensive during testing phases)</em></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>3</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Cybersecurity Architect / Infrastructure Security Expert</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Review of network, server, cloud, and application security architecture; evaluation of technical controls and attack surfaces</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>7+ years in cybersecurity with strong experience in infrastructure security assessment and secure architecture design</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>5 months</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>4</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Vulnerability Management and Risk Analyst</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Vulnerability identification, classification, risk scoring, exploitation impact analysis, and remediation prioritization</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>5+ years in vulnerability management, security assessment, or cyber risk analysis in enterprise environments</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>5 months</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>5</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Project Manager / Engagement Coordinator</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Project planning, coordination, stakeholder engagement, reporting, and delivery tracking</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>5+ years in project management, preferably in cybersecurity or IT security assessment engagements</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>5 months</strong></p></td></tr><tr><td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none\"><p>6</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none\"><p><strong>Change Management / Knowledge Transfer Expert</strong></p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:167px\"><p>Development of technical reports, remediation guidance, and knowledge transfer to ICT teams</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:192px\"><p>5+ years in cybersecurity reporting, documentation, or technical advisory with experience in translating findings into actionable remediation plans</p></td><td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; width:123px\"><p><strong>2&ndash;3 months</strong></p></td></tr></tbody></table><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><ol><li><strong>Contract Type and Other Information:</strong></li></ol><ol><li><strong>Contract Type</strong> - The contract will be Lumpsum with clearly defined deliverables and milestone-based payments. Firms will be expected to meet performance benchmarks, with payments linked to the successful completion of each project phase.&nbsp;</li><li><strong>Expected Duration&nbsp;</strong>- The assignment is expected to last approximately 5 months (21 weeks and 6 days), including 15 weeks at African Union (AU) headquarters and 2 weeks plus 2 days at each of the three AU regional offices, to be selected by the MIS Directorate. Extensions may be considered if required.</li><li><strong>Assignment Location</strong>&nbsp;- The selected firm will primarily work remotely. On-site may be considered for critical assessment, workshops, subject to approval and adherence to security protocols.&nbsp;</li><li><strong>Language </strong>- Fluency in English and/or French as well as a good working knowledge of the other working languages of the Africa Union is an advantage.</li><li><strong>Evaluation and award of the consultancy</strong> - Evaluation of the proposals and award of the contract (consultancy) will be based on educational background, peculiarity of required experience and technical competencies. African Union reserves the right to accept or reject any proposal received without offering any explanation.</li><li><strong>Intellectual Property Rights </strong>- Any reports, documents graphics, or other materials, prepared by the consultancy firm for this assignment shall belong to and remain the property of the African Union.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00449768","notice_type":"Contract Award","noticedate":"08-Jun-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Bhutan","project_id":"P181278","project_name":"Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project","bid_reference_no":"ACCESS/GOVTECH/GD-14","bid_description":"Selection of Consulting firm for Enhancement of National Digital Identity (NDI) for Bhutan National Single Window (BNSW) Trader authentication","procurement_group":"GO","procurement_method_code":"DIR","procurement_method_name":"Direct Selection","submission_date":"2026-06-08T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P181278-Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project<br/><b>Loan/Credit/TF Info:</b>IDA-77560<br/><b>Bid/Contract Reference No:</b>ACCESS/GOVTECH/GD-14<br/><b>Procurement Method:</b>DIR-Direct Selection<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>ENHANCEMENT OF NATIONAL DIGITAL IDENTITY (NDI) SYSTEM FOR BHUTAN NATIONAL SINGLE WINDOW (BNSW) TRADER AUTHENTICATION</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/06/08<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>8 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>BHUTAN NDI LIMITED (1086663)</b><br/>Thimphu TechParkBabesa, Wangchuk TabaThimphu, Bhutan<br/>Country: Bhutan<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>BTN 80000000.00<br/><br/>Evaluated Bid Price<br/>BTN 80000000.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>BTN 80000000.00</div><br/></div></div>"},{"id":"OP00447810","notice_type":"Invitation for Bids","noticedate":"08-Jun-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-07-29T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Tajikistan","project_id":"P506611","project_name":"Tajikistan Digital Foundations Project","bid_reference_no":"TJ-PIC EOP-528031-NC-RFP","bid_description":"Development of BankID","procurement_group":"GO","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","contact_address":"Shotemur 59, Dushanbe","contact_ctry_name":"Tajikistan","contact_email":"md.asror73@gmail.com","contact_name":"Muhammad Asror","contact_organization":"Project Implementation Center under the Executive Office of the President of Tajikistan","contact_phone_no":"(+992)372234005","submission_date":"2026-06-08T00:00:00Z","notice_text":"<p><strong>Request for Proposal</strong></p><p><strong>Information Systems</strong></p><p><strong>(Design, Supply and Installation)</strong></p><p><strong>(Without Prequalification)</strong></p><p>&nbsp;</p><p>Purchaser<strong>:&nbsp;</strong>State Institution &quot;Projects Implementation Center Fundamentals of Digitalization in Tajikistan&quot; of the Executive Office of the President of the Republic of Tajikistan</p><p>Project<strong>:<em>&nbsp;</em></strong>Tajikistan Digital Foundations Project</p><p>Contract title<strong>:&nbsp;</strong>Development of Bank ID</p><p>Country<strong>:&nbsp;</strong>Tajikistan</p><p>Grant No.:<em>&nbsp;</em>TF-C6744</p><p>RFP No:<strong>&nbsp;</strong>TJ-PIC-EOP-528031-NC-RFP</p><p>Issued on:<strong>&nbsp;</strong>08.06.2026</p><p>&nbsp;</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Republic of Tajikistan<em>&nbsp;</em>has received<em>&nbsp;</em>financing from the World Bank toward the cost of the &quot;Tajikistan Digital Foundations Project&quot; and intends to apply part of the proceeds toward payments under the contract for Development of Bank ID.</p><p>2. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The State Institution &quot;Projects Implementation Center Fundamentals of Digitalization in Tajikistan&quot; of the Executive Office of the President of the Republic of Tajikistan now invites sealed Proposals from eligible Proposers for Development of Bank ID</p><p>3. &nbsp;&nbsp;&nbsp;&nbsp; The procurement process will be conducted through international competitive procurement using Request for Proposals (RFP) as specified in the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised September 2023 (&quot;Procurement Regulations&quot;), and is open to all eligible Proposers as defined in the Procurement Regulations.</p><p>4. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Bids will be evaluated in accordance with the evaluation process set out in the bidding documents. The following weightings shall apply for Rated Criteria (including technical and non-price factors):&nbsp;<em>60%.</em>&nbsp;and for Bid cost:&nbsp;<em>40%.</em></p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interested eligible Proposers may obtain further information from State Institution &quot;Projects Implementation Center Fundamentals of Digitalization in Tajikistan&quot; of the Executive Office of the President of the Republic of Tajikistan, Mr. Muhammad Asror, Director, info@dt.tj &nbsp;and inspect the request for proposals document during office hours from 08:00 to 17:00 at the address: 59 Shotemur street, Dushanbe, Tajikistan.</p><p>6. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The request for proposals document in&nbsp;<em>English</em>&nbsp;may be received by interested eligible Proposers upon the submission of a written application to the address below:</p><p>&quot;Projects Implementation Center Fundamentals of Digitalization in Tajikistan&quot; of the Executive Office of the President of the Republic of Tajikistan, Mr. Muhammad Asror, Director, info@dt.tj, 59 Shotemur street, Dushanbe, Tajikistan.</p><p>7. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Proposals must be delivered to the address below&nbsp;on July 29, 2026, 15:00 Dushanbe time. &nbsp;Electronic procurement&nbsp;<strong><em>will not</em></strong>&nbsp;be permitted. Late Proposals will be rejected. The outer Proposal envelopes marked &ldquo;ORIGINAL PROPOSAL&rdquo;, and the inner envelopes marked &ldquo;TECHNICAL PART&rdquo; will be publicly opened in the presence of the Proposers&rsquo; designated representatives and anyone who chooses to attend, at the address below&nbsp;on&nbsp;<strong>July 29, 2026, 15:00</strong>&nbsp;Dushanbe time. All envelopes marked &ldquo;FINANCIAL PART&rdquo; shall remain unopened and will be held in safe custody of the Purchaser until the second public Proposals opening.</p><p>8. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; All Proposals must be accompanied by a&nbsp;<em>&ldquo;<strong>Proposal Security</strong>&rdquo;&nbsp;</em>of&nbsp;<em>USD 26 000&nbsp;</em>or equivalent in any freely convertible currency.</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful Proposer&rsquo;s beneficial ownership, as part of the<strong>&nbsp;</strong>Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the request for proposal document.</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The address referred to above is:</p><p><strong>State Committee on Investments and State Property Management of the Republic of Tajikistan</strong><br />40 Rudaki Avenue, Second Floor, Room 36<br />Dushanbe 734025<br />Republic of Tajikistan</p><p>&nbsp;</p>"},{"id":"OP00445581","notice_type":"Request for Expression of Interest","noticedate":"20-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-06-05T00:00:00Z","submission_deadline_time":"00:00","project_ctry_name":"Mozambique","project_id":"P172350","project_name":"Digital Governance and Economy Project","bid_reference_no":"C241","bid_description":"Development of Mobile Digital Identity Platform for Mozambique","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Av. Vladmir Lenine, nr. 598, 7 e 8 andares, Prédio Utomi Park, Maputo","contact_ctry_name":"Mozambique","contact_email":"procurement@atdi.gov.mz","contact_name":"Alfredo Ulemba","contact_organization":"National e-Government Institute","contact_phone_no":"258 853004034","submission_date":"2026-05-20T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<p>REPUBLIC OF MOZAMBIQUE</p>\n\n<p>MINISTRY OF COMMUNICATIONS AND DIGITAL TRANSFORMATION</p>\n\n<p><strong>DIGITAL TRANSFORMATION AND INNOVATION AGENCY, PUBLIC INSTITUTE (ATDI, IP)</strong></p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;<strong>Digital Governance and Economy Project</strong><strong> - EDGE</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Grant No.: IDA-D906-MZ </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title</strong>: Consulting Services for the Implementation of National Mobile Digital Identity and Electronic Signature Infrastructure for the Republic of Mozambique</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>.: C241</p>\n\n<p>&nbsp;</p>\n\n<p>The Government of Mozambique has received<em> </em>financing from the World Bank toward the cost of the <strong>Digital Governance and Economy Project</strong><strong> - EDGE</strong>, and intends to apply part of the proceeds for consulting services.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>1. Background</strong></p>\n\n<p>The Republic of Mozambique, through the Agency for Digital Transformation and Innovation (ATDI, IP), is implementing an ambitious digital transformation program aligned with the vision of building a more efficient, transparent, and citizen-centered public administration. This program is part of the Digital Economy and Electronic Government Project (EDGE), funded by the World Bank, and aims to establish the foundations of a modern and interoperable Digital Public Infrastructure (DPI).</p>\n\n<p>Within the scope of this program, ATDI, IP has already begun implementing an Interoperability Platform based on X-Road, which will enable the secure exchange of data between government institutions and public and private service providers. To complement this infrastructure and enable the identification, authentication, and digital signature of citizens, residents, and companies, it is necessary to implement a national ecosystem of mobile digital identity and electronic signature.</p>\n\n<p>The mobile digital identity solution to be implemented must be inclusive, scalable, and accessible to all citizens, regardless of their geographic location, connectivity, or device type. It should support multiple implementation modalities (mobile application, physical SIM, and eSIM) to ensure maximum coverage and digital inclusion, particularly in rural areas and communities with limited access to modern smartphones.</p>\n\n<p><strong>2. The Services</strong></p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include:</p>\n\n<ul>\n\t<li>Design and implement a complete mobile digital identity ecosystem based on three complementary technological modalities: mobile application (App-based Mobile ID), physical SIM (SIM-based Mobile ID), and eSIM (eSIM-based Mobile ID), ensuring digital inclusion and national coverage.</li>\n\t<li>Develop and implement or integrate a self-service portal for digital identity and electronic signature management, allowing citizens to manage their devices, certificates, and transactions securely.</li>\n\t<li>Fully integrate the digital identity solution with the X-Road Interoperability Platform already under implementation, ensuring full technical compatibility and compliance with established security and interoperability standards.</li>\n\t<li>Integrate the solution with the National Population Registry (National Directorate of Civil Identification) and the national PKI/CA (Public Key Infrastructure / Certification Authority) infrastructure, guaranteeing the legal validity of digital identities and electronic signatures.</li>\n\t<li>Establish secure mechanisms for identity verification and user onboarding, in compliance with national legal and regulatory requirements and international security standards.</li>\n\t<li>Train and empower technical teams from ATDI and institutional partners (Registration Authorities, mobile network operators, technical support) to operate and maintain the solution within the scope of training provided under this contract.</li>\n\t<li>Transfer knowledge and technology, including SDKs, complete technical documentation, build and deployment instructions, and API specifications, ensuring technological independence and long-term sustainability of the solution.</li>\n</ul>\n\n<p>The detailed Terms of Reference (TOR) for the assignment can be provided on request to email below.</p>\n\n<p>ATDI, IP now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Minimum of 7 years of experience in digital identity projects,&nbsp; PKI/CA or e-government</li>\n\t\t<li>Minimum of 10 years of experience in implementing and operating; integration with telecom operators (MNOs); Integration with public and private e-service providers (banks, government portals, tax systems, healthcare, etc.), Mobile ID solutions</li>\n\t\t<li>Proven experience in governmental digital transformation&nbsp; projects</li>\n\t\t<li><strong>At least 3 reference projects</strong> implemented in the last <strong>7 years</strong> demonstrating experience in:</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>Project 1: SIM/eSIM-based Mobile ID</strong></p>\n\n<ul>\n\t<li>Implementation of mobile digital identity solution based on physical SIM&nbsp; and/or eSIM</li>\n\t<li>Minimum scale: 100,000 users</li>\n\t<li>Including Java Card applet and/or eSIM profiles</li>\n\t<li>Preferably in a governmental environment</li>\n</ul>\n\n<p><strong>Project 2: Integration with X-Road</strong></p>\n\n<ul>\n\t<li>Implementation or integration of services with the X-Road platform</li>\n\t<li>Preferably in a governmental environment</li>\n\t<li>Demonstration of deep knowledge of X-Road Message Protocol and&nbsp; Security Server</li>\n</ul>\n\n<p><strong>Project 3: PKI/CA and Digital Signature</strong></p>\n\n<ul>\n\t<li>Implementation of PKI/CA infrastructure</li>\n\t<li>Issuance of qualified digital certificates</li>\n\t<li>Digital signature with legal validity</li>\n\t<li>Integration with HSM</li>\n</ul>\n\n<p>Key Experts will not be evaluated at the shortlisting stage</p>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>&nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours: 0800 to 1530 hours.</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by 5 June 2026.</p>\n\n<p>&nbsp;</p>\n\n<p>Digital Transformation and innovation Agency, a Public Institute</p>\n\n<p><strong>Digital Governance and Economy Project</strong><strong> - EDGE</strong></p>\n\n<p><strong>Rua 3891 &ndash; Bairro Costa do Sol </strong></p>\n\n<p><strong>-25.946138610954517, 32.61609812100204</strong></p>\n\n<p><strong>Email- </strong><strong>procurement@atdi.gov.mz</strong></p>\n\n<p><strong>Maputo-Mozambique</strong></p>"},{"id":"OP00443935","notice_type":"Invitation for Bids","noticedate":"12-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-06-22T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Congo, Democratic Republic of","project_id":"P180495","project_name":"DRC Digital Transformation Project","bid_reference_no":"ZR-UGP - PTN-542824-GO-RFB","bid_description":"Centre d'Operations de Sécurité Gouvernemental (GOVSOC)","procurement_group":"GO","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"Kinshasa-RDC","contact_ctry_name":"Congo, Democratic Republic of","contact_email":"noel.litanga@ugpatn.cd","contact_name":"Noël Litanga","contact_organization":"Digital Transformation Project","contact_phone_no":"+243810000355","submission_date":"2026-05-12T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>PROJET DE TRANSFORMATION NUMERIQUE &laquo;&nbsp;PTN&nbsp;&raquo; </strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Avis Sp&eacute;cifique d&rsquo;Appel d&rsquo;Offres (AA0)</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Appel d&rsquo;Offres No :</strong> <strong>ZR-UGP - PTN-542824-GO-RFB</strong></p>\n\n<p><strong>Projet&nbsp;</strong><em>:</em><strong> PROJET DE TRANSFORMATION NUM&Eacute;RIQUE</strong></p>\n\n<p><strong>Acheteur :</strong><strong> </strong><strong>UNITE DE GESTION DU PROJET DE TRANSFORMATION NUMERIQUE (UG PTN)</strong></p>\n\n<p><strong>Pays&nbsp;:</strong><em> </em><strong>REPUBLIQUE DEMOCRATIQUE DU CONGO</strong></p>\n\n<p><strong>Intitul&eacute; du March&eacute;</strong><em>&nbsp;: </em><strong>Centre d&rsquo;Op&eacute;rations de S&eacute;curit&eacute; Gouvernemental (GOVSOC)</strong></p>\n\n<p><strong>Cr&eacute;dit No&nbsp;:7602-ZR (Banque mondiale)</strong></p>\n\n<p><strong>Convention de cofinancement&nbsp;AFD&nbsp;N&deg; :CCD 1198 01 H (Agence Fran&ccedil;aise de D&eacute;veloppement)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Emis le&nbsp;</strong><em>: <strong>11 mai 2026</strong></em></p>\n\n<p>&nbsp;</p>\n\n<p>1.Le Gouvernement de la R&eacute;publique du Congo<em> a re&ccedil;u deux financements dont l&rsquo;un </em>de la Banque mondiale et le second de l&rsquo;Agence Fran&ccedil;aise de D&eacute;veloppement pour financer le co&ucirc;t du Projet de Transformation Num&eacute;rique<em>,</em> et &agrave; l&rsquo;intention d&rsquo;utiliser une partie de ce financement pour effectuer des paiements au titre du March&eacute; de <strong>Fourniture d&#39;&eacute;quipements(serveurs et licences) du Centre d&rsquo;Op&eacute;rations de S&eacute;curit&eacute; Gouvernemental (GOVSOC)</strong><em>: </em>&laquo;&nbsp;Pour ce march&eacute;, l&rsquo;Emprunteur utilisera la m&eacute;thode de d&eacute;caissement par Paiement Direct, telle que d&eacute;finie dans les Directives de D&eacute;caissement de la Banque mondiale pour le Financement de Projet d&rsquo;Investissement, &agrave; l&rsquo;exception des paiements pour lesquels le march&eacute; pr&eacute;voit l&rsquo;utilisation de cr&eacute;dit documentaire.&nbsp;&raquo;</p>\n\n<p>2.L&rsquo;Unit&eacute; de Gestion du Projet de Transformation Num&eacute;rique (PTN) sollicite des offres ferm&eacute;es de la part de soumissionnaires &eacute;ligibles et r&eacute;pondant aux qualifications requises pour la mise en place acc&eacute;l&eacute;r&eacute;e d&#39;un Centre d&#39;Op&eacute;rations de S&eacute;curit&eacute; Gouvernemental (GOVSOC) destin&eacute; &agrave; assurer, au minimum, les fonctions suivantes &agrave; l&#39;&eacute;chelle du p&eacute;rim&egrave;tre pilote :</p>\n\n<ul>\n\t<li>Collecte centralis&eacute;e et s&eacute;curis&eacute;e des journaux/&eacute;v&eacute;nements (logs) et t&eacute;l&eacute;m&eacute;tries cyber ;</li>\n\t<li>D&eacute;tection (corr&eacute;lation, r&egrave;gles, cas d&#39;usage) et alerte en temps (quasi) r&eacute;el ;</li>\n\t<li>Gestion des incidents (qualification, escalade, r&eacute;solution, post-mortem) ;</li>\n\t<li>Supervision 16/7 minimum (baseline MVP Minimum Viable Product), extensible 24/7 selon l&#39;offre ;</li>\n\t<li>Tableaux de bord et reporting d&eacute;cisionnel ;</li>\n\t<li>Transfert de comp&eacute;tences et de documentation compl&egrave;te.</li>\n</ul>\n\n<p><em>Le mod&egrave;le de supervision MVP est fix&eacute; &agrave; 16/7 (06h00-22h00, heure locale). </em></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:633px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:312px\">\n\t\t\t<p><strong>Description des Fournitures et Services Connexes sollicit&eacute;s</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:123px\">\n\t\t\t<p><strong>Quantit&eacute;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:198px\">\n\t\t\t<p><strong>Lieu de livraison/</strong></p>\n\n\t\t\t<p><strong>Installation</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:633px\">\n\t\t\t<p><strong>I. Infrastructure technique &ndash; DATA CENTER (RACK 42U)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.1. Serveurs&nbsp; SIEM (Cluster Haute Disponibilit&eacute;)</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Format rack 1U ou 2U</li>\n\t\t\t\t<li>2 x CPU (16&ndash;24 c&oelig;urs minimum chacun)</li>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:123px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:38px; vertical-align:top; width:198px\">\n\t\t\t<p>Bureaux RAXIO DATA CENTER RDC</p>\n\n\t\t\t<p>12 &egrave;me rue Limete Industriel, Kinshasa R&eacute;publique D&eacute;mocratique du Congo (RDC)</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.2 Serveur Management / Orchestration</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>CPU 16 c&oelig;urs minimum</li>\n\t\t\t\t<li>RAM 64&ndash;128 Go</li>\n\t\t\t\t<li>2 x 10Gb</li>\n\t\t\t\t<li>RAID 1 SSD</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.3 Serveurs Collectors Logs</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>CPU 12&ndash;16 c&oelig;urs</li>\n\t\t\t\t<li>RAM 128 Go</li>\n\t\t\t</ul>\n\n\t\t\t<p>Capacit&eacute; d&rsquo;ingestion 5k EPS par collecteur minimum avec redondance</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:66px; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.4 Serveur SOAR</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>CPU 24 c&oelig;urs</li>\n\t\t\t\t<li>RAM 256 Go</li>\n\t\t\t\t<li>Stockage SSD 2 To</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:66px; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:94px; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.5 Serveur EDR Management</strong></p>\n\n\t\t\t<p>La solution EDR propos&eacute;e devra &ecirc;tre dimensionn&eacute;e pour assurer la protection et la gestion d&rsquo;au moins 1000 endpoints dans le cadre du MVP.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:94px; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.6 Stockage SAN/NAS</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Capacit&eacute; brute adapt&eacute;e &agrave; 180 jours hot</li>\n\t\t\t\t<li>RAID 10 ou &eacute;quivalent</li>\n\t\t\t\t<li>D&eacute;bit &ge; 5&ndash;10 Gb/s</li>\n\t\t\t\t<li>Extensible &agrave; 12 mois</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:65px; vertical-align:top; width:312px\">\n\t\t\t<p><strong>I.7 S&eacute;curit&eacute; &amp; R&eacute;seau Rack</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>&nbsp;KVM IP</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:65px; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:65px; vertical-align:top; width:198px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<ul>\n\t\t\t\t<li>Firewall d&eacute;di&eacute;s segmentation SOC</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<ul>\n\t\t\t\t<li>Routeurs (front/back-end) : fonctions de routage et haute disponibilit&eacute; (VRRP/HSRP), support BGP/OSPF, IPsec si requis, interfaces 1/10GbE.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<ul>\n\t\t\t\t<li>Switch ToR 10Gb</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<ul>\n\t\t\t\t<li>&nbsp;PDU intelligents</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:633px\">\n\t\t\t<p><strong>II. LICENCES A FOURNIR (MVP)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>II.1 SIEM</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Licence 10 000 EPS minimum</li>\n\t\t\t\t<li>R&eacute;tention 180 jours</li>\n\t\t\t\t<li>Module reporting</li>\n\t\t\t\t<li>API &amp; int&eacute;gration</li>\n\t\t\t\t<li>Support &eacute;diteur 3 ans</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"4\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\">\n\t\t\t<p><strong>Bureaux RAXIO DATA CENTER RDC </strong></p>\n\n\t\t\t<p><strong>12 &egrave;me rue Limete Industriel, Kinshasa R&eacute;publique D&eacute;mocratique du Congo (RDC)</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>II.2 EDR</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>1 000 endpoints</li>\n\t\t\t\t<li>Fonction isolation machine</li>\n\t\t\t\t<li>Int&eacute;gration SIEM</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>II.3 SOAR</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Playbooks automatis&eacute;s</li>\n\t\t\t\t<li>Connecteurs firewall + EDR</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:77px; vertical-align:top; width:312px\">\n\t\t\t<p><strong>II.4 Syst&egrave;mes</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>OS serveurs</li>\n\t\t\t\t<li>Licence hyperviseur (si virtualis&eacute;)</li>\n\t\t\t\t<li>Licence sauvegarde</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:633px\">\n\t\t\t<p><strong>III.SALLE SOC &ndash; AM&Eacute;NAGEMENT &amp; &Eacute;QUIPEMENTS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>3.1. Postes Analystes</strong></p>\n\n\t\t\t<table>\n\t\t\t\t<thead>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>&Eacute;quipement</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>Quantit&eacute;</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</thead>\n\t\t\t\t<tbody>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>Postes N1</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>6</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>Postes N2</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>2</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>Poste Manager</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>1</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>&Eacute;crans doubles</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>18</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t\t<tr>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>T&eacute;l&eacute;phones IP</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t\t<td>\n\t\t\t\t\t\t<p>8</p>\n\t\t\t\t\t\t</td>\n\t\t\t\t\t</tr>\n\t\t\t\t</tbody>\n\t\t\t</table>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"5\" style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:198px\">\n\t\t\t<p><strong>Secr&eacute;tariat Economie </strong></p>\n\n\t\t\t<p><strong>Num&eacute;rique</strong></p>\n\n\t\t\t<p><strong>Croisement des avenues du Livre et des huileries</strong></p>\n\n\t\t\t<p><strong>Commune de la Gombe</strong></p>\n\n\t\t\t<p><strong>Ville Province de Kinshasa</strong></p>\n\n\t\t\t<p><strong>R&eacute;publique D&eacute;mocratique du Congo</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>3.2 Mur de Monitoring</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>4&ndash;6 &eacute;crans 55&ndash;65&rdquo;</li>\n\t\t\t\t<li>Contr&ocirc;leur vid&eacute;o</li>\n\t\t\t\t<li>Support mural s&eacute;curis&eacute;</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>3.3 S&eacute;curit&eacute; Salle SOC</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Contr&ocirc;le acc&egrave;s biom&eacute;trique</li>\n\t\t\t\t<li>CCTV</li>\n\t\t\t\t<li>Journal acc&egrave;s</li>\n\t\t\t\t<li>Porte renforc&eacute;e</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p><strong>3.4 Travaux techniques</strong></p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Circuit &eacute;lectrique d&eacute;di&eacute;</li>\n\t\t\t\t<li>UPS (30&ndash;60 min)</li>\n\t\t\t\t<li>Lien fibre d&eacute;di&eacute; vers DC</li>\n\t\t\t\t<li>Climatisation d&eacute;di&eacute;e</li>\n\t\t\t\t<li>Traitement acoustique</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:312px\">\n\t\t\t<p>3.5 Mise en &oelig;uvre progressive des exigences de s&eacute;curit&eacute; physique</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:123px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>3. La passation du March&eacute; sera conduite par Mise en Concurrence internationale (AOI) telle que d&eacute;finie dans le &laquo;&nbsp;R&egrave;glement de Passation des March&eacute;s pour les Emprunteurs sollicitant le Financement de Projets d&rsquo;Investissement&nbsp;&raquo; de la Banque mondiale, septembre 2025, et ouverte &agrave; tous les soumissionnaires de pays &eacute;ligibles tels que d&eacute;finis dans ledit R&egrave;glement.</p>\n\n<p>4. Les Soumissionnaires int&eacute;ress&eacute;s et &eacute;ligibles peuvent obtenir des informations suppl&eacute;mentaires &agrave; l&rsquo;Unit&eacute; de Gestion du Projet de Transformation Num&eacute;rique, e-mail&nbsp;: <strong>info@ugpatn.cd</strong> et t&eacute;l&eacute;phone&nbsp;: +243810000355<em> </em>et examiner le Dossier d&rsquo;Appel d&rsquo;Offres durant les heures de bureau de 9 :00 &agrave; 17&nbsp;:00 heures &agrave; l&rsquo;adresse indiqu&eacute;e ci-dessous.</p>\n\n<p>5.Les Soumissionnaires int&eacute;ress&eacute;s et &eacute;ligibles peuvent obtenir un dossier d&rsquo;appel d&rsquo;offres complet en formulant une demande &eacute;crite &agrave; l&rsquo;adresse ci-dessous contre un paiement non remboursable &eacute;quivalent &agrave; <strong>100 USD (Dollars am&eacute;ricains cent)</strong><strong>.</strong> La m&eacute;thode de paiement sera par d&eacute;p&ocirc;t&nbsp;&nbsp; direct sur le compte du Projet ci-dessus. Les paiements dans le compte ci-dessous, ouvert &agrave; <strong>la SOFIBANQUE SA :</strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:83px\">\n\t\t\t<p><strong>DEVISE</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:190px\">\n\t\t\t<p><strong>INTITULE DE COMPTE</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:196px\">\n\t\t\t<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; RIB</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:100px\">\n\t\t\t<p><strong>Code Swift </strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:83px\">\n\t\t\t<p><strong>USD</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:190px\">\n\t\t\t<p><strong>MINFIN RDC/PROJET DE TRANS. NUMERIQUE</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:196px\">\n\t\t\t<p><strong>00023201330240409020135</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:100px\">\n\t\t\t<p><strong>SFBXCDKI</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Le&nbsp;dossier d&rsquo;appel d&rsquo;offres (DAO) pourra &ecirc;tre retir&eacute; dans les bureaux du projet situ&eacute;s &agrave; l&rsquo;adresse indiqu&eacute;e ci-dessous apr&egrave;s pr&eacute;sentation de la preuve de paiement des frais d&rsquo;acquisition du DAO. Pour les soumissionnaires install&eacute;s au Congo ou &agrave; l&rsquo;&eacute;tranger, le DAO pourrait leur &ecirc;tre envoy&eacute; par courrier &eacute;lectronique, apr&egrave;s fourniture de la preuve de paiement des frais d&rsquo;acquisition du DAO &agrave; travers l&rsquo;adresse &eacute;lectronique ci-dessous.</p>\n\n<p>&nbsp;</p>\n\n<p>6.Les offres devront &ecirc;tre soumises &agrave; l&rsquo;adresse indiqu&eacute;e ci-dessous&nbsp; <em>&nbsp;</em>au plus tard le 22 juin 2026<em> <strong>&agrave; 14H00&rsquo;</strong></em>. La soumission des offres par voie &eacute;lectronique<em> &laquo;&nbsp;ne sera pas&nbsp;&raquo;</em> autoris&eacute;e. Les offres remises en retard ne seront pas accept&eacute;es. Les offres seront ouvertes publiquement en pr&eacute;sence des repr&eacute;sentants des Soumissionnaires et de toute personne choisissant d&rsquo;&ecirc;tre pr&eacute;sente &agrave; l&rsquo;adresse mentionn&eacute;e ci-dessous&nbsp;&nbsp; &agrave; <strong>: </strong></p>\n\n<p><strong>Salle de r&eacute;unions de l&rsquo;Unit&eacute; de Gestion du Projet et de Transformation Num&eacute;rique (UG PTN),</strong> <strong>le&nbsp;22 juin 2026 &agrave; 14 h 30&rsquo;</strong>. &nbsp;</p>\n\n<p>7.Toutes les offres doivent comprendre <strong>&laquo;&nbsp;une Garantie de l&rsquo;Offre&nbsp;&raquo;,</strong> pour un montant de &nbsp;&nbsp;&nbsp;&nbsp;<strong>120 000 USD (Dollars am&eacute;ricains cent vingt mille)<em>. </em></strong></p>\n\n<p>&nbsp;</p>\n\n<p>8.L&rsquo;attention est attir&eacute;e sur le R&egrave;glement de Passation de March&eacute;s exigeant que l&rsquo;Emprunteur divulgue des informations sur la propri&eacute;t&eacute; effective du Soumissionnaire retenu, dans le cadre de la Notification d&rsquo;Attribution du March&eacute;, en utilisant le Formulaire de Divulgation des B&eacute;n&eacute;ficiaires Effectifs tel qu&rsquo;il est inclus dans le document d&rsquo;appel d&rsquo;offres.</p>\n\n<p>9.L&rsquo;(les) adresse(s) auxquelles il est fait r&eacute;f&eacute;rence ci-dessus est(sont)&nbsp;:</p>\n\n<p><strong>Unit&eacute; de Gestion du Projet de Transformation Num&eacute;rique, </strong></p>\n\n<p><strong>A Monsieur Noel LITANGA, Coordonnateur</strong></p>\n\n<p><strong>15, Avenue Pumbu</strong></p>\n\n<p><strong>Immeuble H</strong></p>\n\n<p><strong>Commune de la Gombe &ndash; Kinshasa, RDC </strong></p>\n\n<p><strong>T&eacute;l. : + 243 (0) 810000355 </strong></p>\n\n<p><strong>E-mail : </strong>info@ugpatn.cd</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Noel Jean David LITANGA SANGU PAMBA</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Coordonnateur</strong></p>\n\n<p>&nbsp;</p>"},{"id":"OP00444249","notice_type":"Request for Expression of Interest","noticedate":"11-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-06-01T00:00:00Z","submission_deadline_time":"05:00","project_ctry_name":"Liberia","project_id":"P175263","project_name":"Liberia: Rural Economic Transformation Project","bid_reference_no":"LR-PMU-MOA-551322-CS-QCBS","bid_description":"Consultancy Services for the Development of a Digital Tracking and Management System for Agricultural Machinery and Service Centers","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Somalia Drive\nGardnerville","contact_ctry_name":"Liberia","contact_email":"gtoto@moa.gov.lr","contact_name":"Galah S. Toto","contact_organization":"Program Management Unit- Ministry of Agriculture","contact_phone_no":"0777576980","submission_date":"2026-05-11T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<p><strong>WORLD BANK/IFAD PROGRAM IMPLEMENTATION UNIT</strong></p>\n\n<p><strong>MINISTRY OF AGRICULTURE</strong>, <strong>REPUBLIC OF LIBERIA</strong></p>\n\n<p><strong>Rural Economic Transformation Project (RETRAP)</strong></p>\n\n<p><strong>1st Floor LIBSUCO Building Japan Freeway (Formerly Somalia Drive), </strong></p>\n\n<p><strong>Gardnersville &ndash; Monrovia, Liberia</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>LOAN #: P175263; IDA: 69000</strong></p>\n\n<p><strong><u>REQUEST FOR EXPRESSION OF INTEREST</u></strong></p>\n\n<p><strong><u>(CONSULTING SERVICES &ndash; FIRMS SELECTION</u><u>)</u></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title: &nbsp;Consultancy Services for the Development of a Digital Tracking and Management System for Agricultural Machinery and Service Centers</strong></p>\n\n<p><strong>REOI Reference No:&nbsp; </strong><strong>LR-PMU-MOA-551322-CS-QCBS</strong></p>\n\n<ol>\n\t<li><strong>Background and Rationale</strong></li>\n</ol>\n\n<p><strong>&nbsp;</strong>Agricultural mechanization is a cornerstone for transforming Liberia&rsquo;s farming systems, enabling smallholder farmers to increase productivity and efficiency. However, the sector faces challenges including low equipment utilization, weak monitoring, and high fuel consumption. To address these, the Ministry of Agriculture (MoA), with World Bank support under the Rural Economic Transformation Project (RETRAP), is establishing Agricultural Mechanization Service Centers (AMSCs).</p>\n\n<p>This assignment involves the development of a Mechanization Management and Tracking System (MMTS) and Standard Operating Procedures (SOPs). The system is intended to function as a management and accountability platform, integrating with the RETRAP reporting database and the National Farmer Registry to ensure traceability, transparency, and economic sustainability of mechanization services delivered to smallholder farmers across Liberia.</p>\n\n<p><strong>2. Objectives</strong><strong> Primary Objective: </strong>To implement a nationally scalable mechanization management and accountability system that improves equipment utilization, performance tracking, cost recovery, and service delivery to smallholder farmers, thereby enhancing agricultural productivity and climate resilience.</p>\n\n<p><strong>Specific Objectives</strong></p>\n\n<ul>\n\t<li>Digitally register all mechanization equipment and operators with unique identifiers.</li>\n\t<li>Track granular service metrics including hectares covered, GPS location, and fuel efficiency.</li>\n\t<li>Enable demand aggregation by geography and season to drive efficient AMSC scheduling.</li>\n\t<li>Integrate mechanization data with the National Farmer Registry and RETRAP databases.</li>\n\t<li>Establish standardized operational workflows and protocols (SOPs) for all AMSC activities.</li>\n</ul>\n\n<p><strong>3. Scope of Work:</strong><strong> The Consultant will:</strong></p>\n\n<ul>\n\t<li>Conduct stakeholder consultations and a National Farmer Registry Readiness Assessment.</li>\n\t<li>Design a vendor-neutral system architecture and comprehensive data models for equipment and financial transactions.</li>\n\t<li>Develop the full MMTS platform, including mobile field modules with offline synchronization capabilities.</li>\n\t<li>Deploy and pilot the system in up to five (5) selected AMSCs and produce a Pilot Learning Report.</li>\n\t<li>Develop a multi-tiered supervision hierarchy and real-time performance dashboards.</li>\n\t<li>Deliver a &quot;Train the Trainer&quot; program and finalize user manuals/SOPs for national rollout.</li>\n\t<li>Ensure full transfer of all source code, data, and technical documentation to MoA and RETRAP.</li>\n</ul>\n\n<p><strong>The shortlisting criteria are:</strong><strong> </strong></p>\n\n<p><strong>(a)</strong> Core Business and Number of Years in Business: The firm must have at least ten (10) years of proven experience in software development and ICT consultancy.</p>\n\n<p>&nbsp;<strong>(b)</strong> Technical and Managerial Organization of the Firm: Evidence of technical capacity in cloud-based solutions, secure data management, and mobile application development.</p>\n\n<p><strong>(c)</strong> Description of Similar Assignments: A minimum of seven (7) years of specialized experience in the design and deployment of fleet tracking solutions, management information systems (MIS), or similar national-level agricultural digital platforms.</p>\n\n<p><strong>(d)</strong> Experience in Similar Conditions: Demonstrated experience deploying digital systems in rural environments with limited connectivity, preferably in West Africa.</p>\n\n<p><strong>(e)</strong> Availability of Appropriate Skills among Staff (Project Manager, System Architect, Mechanization Specialist, Data Governance Expert, and GIS Analyst).</p>\n\n<p><strong>Note: </strong>Key Experts will not be evaluated at the shortlisting stage.</p>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment can be found at the following websites: a) </strong>www.moa.gov.lr<strong> b)&nbsp; Alternatively, it can be directly requested via email from </strong>dkulah@moa.gov.lr<strong>.</strong></p>\n\n<p>The attention of interested firms is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers,&rdquo; Seventh Edition, September 2025, setting forth the World Bank&rsquo;s policy on conflict of interest. In addition, please refer to paragraph 3.17 of the Procurement Regulations on unfair competitive advantage related to this assignment. The Regulations are available on the Bank&rsquo;s website at www.worldbank.org/procurement. A Consultant will be selected in accordance with the Quality and Cost-based Selection (QCBS) method set out in the Procurement Regulations<strong>.</strong></p>\n\n<p>Expressions of interest must be submitted electronically in a format that cannot be altered (PDF format is preferred) to the email address below by <strong>1st June 2026 @ 5:00 pm local time</strong><strong>.</strong></p>\n\n<p><strong>Note</strong>: All expressions of interest MUST be submitted to the email address below:</p>\n\n<p>Galah Toto National Project Coordinator</p>\n\n<p>Project Implementation Unit (PIU),</p>\n\n<p>Ministry of Agriculture Rural Economic Transformation Project (RETRAP)</p>\n\n<p>2nd Floor LIBSUCO Building, Japanese Freeway (Formerly Somalia Drive), Gardnersville &ndash; Monrovia, Liberia Tel: +231-777576980 Email: retrapbids@moa.gov.lr with a copy to Email: gtoto@moa.gov.lr</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p>Design, Development, and Implementation of the</p>\n\n<p><strong>Agricultural Mechanization Tracking System (MMTS)</strong></p>\n\n<p>Standard Operating Procedures and Operator Capacity Building Program</p>\n\n<p>&nbsp;</p>\n\n<p>Ministry of Agriculture | Rural Economic Transformation Project (RETRAP)</p>\n\n<p>Republic of Liberia</p>\n\n<p>February 2026</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>1. Background</p>\n\n<p>Agricultural mechanization is a cornerstone for transforming Liberia&#39;s farming systems, enabling smallholder farmers and agri-enterprises to increase productivity, reduce reliance on manual labor, and improve efficiency across land preparation, cultivation, harvesting, and post-harvest operations. Despite its potential, mechanization in Liberia continues to face persistent challenges, including low equipment utilization, weak monitoring and supervision, high fuel consumption, poor maintenance tracking, and limited visibility of service delivery performance. These operational gaps are compounded by weak institutional capacity, resulting in fragmented oversight, inconsistent service standards, and limited accountability. Without strong governance structures, mechanization services risk becoming unreliable, unsustainable, and inaccessible to the farmers who need them most.</p>\n\n<p>To address these constraints, the Ministry of Agriculture (MoA), with technical and financial support from the World Bank under the Rural Economic Transformation Project (RETRAP), is establishing Agricultural Mechanization Service Centers (AMSCs). These centers will serve as centralized hubs providing modern mechanization services that enhance agricultural productivity, improve rural livelihoods, and promote sustainable farming practices. By aggregating demand and supply, AMSCs reduce costs, foster private sector participation, and ensure long-term sustainability of mechanization solutions. However, for these centers to succeed, institutional strengthening and organizational capacity building are essential to ensure that management systems, supervision frameworks, and accountability mechanisms are robust and responsive.</p>\n\n<p>The economic sustainability of each AMSC depends on a sound operational business model. This means that mechanization services must be priced to recover costs, service utilization rates must meet realistic targets, and maintenance reserves must be adequately funded. Beyond tracking equipment use, an effective management platform must help assess utilization rates against targets, calculate cost per hectare serviced, monitor fuel efficiency by equipment type and operator, measure revenue recovery against operational expenditure, and evaluate affordability for smallholder farmers. Without this economic visibility, there is a real risk that AMSCs become operational liabilities rather than sustainable service hubs. The Mechanization Management and Tracking System (MMTS) must therefore be designed not merely as an equipment register but as a management and accountability platform that improves the economic efficiency, sustainability, and transparency of mechanization services delivered to smallholder farmers across Liberia.</p>\n\n<p>The proposed MMTS, supported by standardized Standard Operating Procedures (SOPs) and a structured supervision framework, is designed to directly address these institutional weaknesses. By embedding transparency, accountability, and evidence-based management into mechanization services, the MMTS will strengthen organizational oversight and harmonize national mechanization data. Building on proven digital agriculture infrastructure, the system will integrate with the RETRAP reporting database to ensure farmer linkage, traceability, and comprehensive monitoring of mechanization services. This intervention directly contributes to RETRAP&#39;s broader objectives of increasing productivity and market access for smallholder farmers and agri-enterprises, while advancing climate-smart agriculture, agribusiness development, and workforce training. Ultimately, the initiative seeks to reduce food insecurity, promote economic transformation, and build resilience in Liberia&#39;s rural communities.</p>\n\n<p>2. Purpose of the Assignment</p>\n\n<p>The purpose of this assignment is to procure a qualified firm to design, develop, and deploy a nationally scalable Mechanization Management and Tracking System, along with a comprehensive operational framework for the AMSCs. The work will proceed in clearly defined phases, with each phase subject to review and acceptance before the next phase begins. Specifically, the assignment seeks to:</p>\n\n<ul>\n\t<li>Design and deploy a digital MMTS that functions as a management and accountability platform, not merely a tracking tool.</li>\n\t<li>Develop standardized SOPs for mechanization center operations across equipment deployment, service delivery, maintenance, data collection, and financial reconciliation.</li>\n\t<li>Establish a supervision and performance monitoring framework that gives MoA and RETRAP real-time visibility into service delivery quality, economic performance, and accountability across all AMSCs.</li>\n\t<li>Build the capacity of mechanization center operators, supervisors, and MoA technical staff to manage, use, and sustain the system independently.</li>\n\t<li>Establish clear arrangements for intellectual property, data ownership, technology transferability, and long-term government control of all digital assets created under this contract.</li>\n</ul>\n\n<p>3. Overall Objective</p>\n\n<p>To implement a nationally scalable mechanization management and accountability system that improves equipment utilization, performance tracking, cost recovery, and service delivery to smallholder farmers, thereby enhancing agricultural productivity, economic efficiency, and climate resilience. The system must be fully owned and operable by the Government of Liberia upon handover, with no dependency on proprietary vendor platforms or ongoing vendor licensing.</p>\n\n<p>4. Specific Objectives</p>\n\n<ul>\n\t<li>Digitally register all mechanization equipment and operators with unique identifiers and maintain an accurate, current registry.</li>\n\t<li>Track granular service delivery metrics including hectares covered, precise geographical location via GPS, service duration, fuel consumption per operation, type of service rendered, and the farmer served.</li>\n\t<li>Monitor equipment performance, maintenance schedules, and repair history in real time.</li>\n\t<li>Enable demand aggregation by geography and season so that AMSC scheduling is driven by verified farmer requests rather than ad hoc operations.</li>\n\t<li>Track and assess private provider performance using measurable indicators including service completion rates, average response time, and farmer satisfaction scores.</li>\n\t<li>Integrate mechanization services data with the National Farmer Registry, subject to a confirmed readiness assessment and a documented go-or-no-go decision before system architecture is finalized.</li>\n\t<li>Assess economic performance of each AMSC by tracking cost per hectare, fuel efficiency, revenue recovery, and utilization against operational targets.</li>\n\t<li>Establish standardized operational workflows and protocols for all AMSC activities, covering equipment deployment, service delivery, data collection, maintenance, and reporting.</li>\n\t<li>Train operators and supervisors on system use, data entry, reporting, and sustainable mechanization practices, and transfer full operational knowledge to MoA and RETRAP.</li>\n</ul>\n\n<p>5. Value Chain Linkages</p>\n\n<p>Liberia&#39;s priority agricultural value chains each have distinct mechanization needs. The MMTS must be designed to collect data that is relevant and useful for each value chain, without gathering information that has no practical application. The table below provides an indicative mapping of value chains to the mechanization services and system indicators that apply. The role of mechanization for poultry and piggery should be clarified with MoA during the inception phase, and excluded from system scope if it does not involve field mechanization relevant to the MMTS.</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:167px\">\n\t\t\t<p><strong>Value Chain</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:300px\">\n\t\t\t<p><strong>Primary Mechanization Services</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:313px\">\n\t\t\t<p><strong>Key MMTS Indicators</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:167px\">\n\t\t\t<p>Rice</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:300px\">\n\t\t\t<p>Land clearing, ploughing, harrowing, transplanting, harvesting, threshing</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:313px\">\n\t\t\t<p>Hectares prepared, turnaround time per hectare, fuel per hectare, farmer satisfaction</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:167px\">\n\t\t\t<p>Cassava</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:300px\">\n\t\t\t<p>Land preparation, ridging, mechanized harvesting</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:313px\">\n\t\t\t<p>Hectares serviced, implement type used, service completion rate</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:167px\">\n\t\t\t<p>Rubber</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:300px\">\n\t\t\t<p>Land clearing, mechanized tapping support, transport logistics</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:313px\">\n\t\t\t<p>Equipment deployment frequency, area cleared, maintenance history</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:167px\">\n\t\t\t<p>Poultry and Piggery</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:300px\">\n\t\t\t<p>To be clarified or excluded during inception</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:313px\">\n\t\t\t<p>To be determined in consultation with MoA during Stage 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>6. Farmer Service Journey</p>\n\n<p>The MMTS must support and document the complete service journey from the moment a farmer requests assistance to the point of payment reconciliation and feedback collection. The system must be designed around this workflow, not as a separate afterthought. The standard service journey consists of the following steps:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Request: A farmer or Farmer Based Organization (FBO) submits a service request through the MMTS, either via a mobile application, SMS, or through a registered AMSC agent.</li>\n\t<li>Demand Aggregation: Requests are aggregated by location, crop type, and season. The system assists AMSC managers in prioritizing and batching service delivery to reduce travel time and operational cost.</li>\n\t<li>Scheduling: The AMSC manager assigns equipment and an operator to the service request and the schedule is confirmed in the system with an estimated service date.</li>\n\t<li>Service Delivery: The operator records the actual service event in the field using the MMTS mobile module, capturing GPS location, duration, fuel consumed, implement used, and any issues encountered.</li>\n\t<li>Farmer Confirmation: Upon service completion, the farmer receives an SMS notification and is prompted to confirm that the service was delivered. This lightweight confirmation mechanism improves data integrity and provides an independent accountability check on operator records.</li>\n\t<li>Payment and Reconciliation: Any fee collected is recorded in the system against the service event and linked to the farmer and the AMSC revenue account. The system supports tracking of subsidized, full-cost, and waived payments.</li>\n\t<li>Feedback: The farmer is given an opportunity to rate the service and submit any concerns. This feedback is visible to AMSC managers and MoA supervisors through the monitoring dashboard.</li>\n</ol>\n\n<p>7. Scope of Work</p>\n\n<p>The assignment is organized into four implementation phases. Each phase concludes with a defined deliverable and a formal review by the Project Implementation Unit (PIU). The next phase will only commence upon written acceptance of the preceding phase deliverables. This phased structure is essential to manage the inherent complexity of integrating a national tracking system, to allow learning from the pilot before committing to full national rollout, and to protect the Government&#39;s investment.</p>\n\n<p>&nbsp;</p>\n\n<p>Phase 1: Design and Readiness</p>\n\n<p>Estimated Duration: 10 to 14 weeks</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Stage 1: Stakeholder Consultations and Requirements Gathering (Estimated 4 weeks)</strong></p>\n\n<ul>\n\t<li>Conduct in-depth consultations with MoA, RETRAP, farmer cooperatives, AMSC managers, county agricultural officers, and relevant government IT departments to validate system requirements and functional specifications.</li>\n\t<li>Map the existing RETRAP reporting database structure in detail, including database schema, API documentation, and data formats, to identify integration requirements, gaps, and risks.</li>\n\t<li>Conduct a National Farmer Registry Readiness Assessment to evaluate the completeness, deduplication status, georeferencing quality, and technical accessibility of the registry. This assessment is a mandatory deliverable of Stage 1. Based on its findings, the PIU will make a documented go-or-no-go decision on registry integration before Stage 2 begins. If the registry is found to be insufficiently ready, the Stage 2 system architecture will be designed for future integration rather than immediate connection.</li>\n\t<li>Consult with MoA to clarify the role of poultry and piggery within the MMTS scope, and document the agreed value chain coverage as part of the Stage 1 report.</li>\n\t<li>Document the farmer service journey in each pilot AMSC context and confirm the demand aggregation and scheduling workflow to be supported by the system.</li>\n\t<li>Clarify device availability: whether field devices will be government-furnished or procured under this contract. If devices fall within scope, the Consultant shall recommend minimum technical specifications (a minimum of Android 10, 4GB RAM, and IP54-rated for dust and water resistance given field conditions in Liberia). If devices are government-furnished, the Consultant shall document minimum compatibility requirements.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Stage 2: System Architecture and Data Design (Estimated 6 to 10 weeks)</strong></p>\n\n<p>Given the complexity of the required integrations, the offline functionality requirements, the multi-role user management, and the open API specifications, the architecture and data design stage requires dedicated time and must not be compressed. This stage may run concurrently with the final weeks of stakeholder consultations to avoid unnecessary delays.</p>\n\n<ul>\n\t<li>Define comprehensive data models for equipment, operators, services, farmer linkages, and financial transactions.</li>\n\t<li>Design system architecture in accordance with the technology neutrality requirements set out in Section 10, ensuring that no proprietary frameworks are used that would create vendor lock-in.</li>\n\t<li>Specify the hosting arrangement, confirming whether the system will be hosted under a dedicated government subdomain such as mmts.moa.gov.lr or equivalent, and defining who will manage hosting infrastructure and associated costs after handover.</li>\n\t<li>Design open API specifications for integration with the RETRAP reporting database, the National Farmer Registry (subject to the go-or-no-go decision from Stage 1), and future interoperability with GIS platforms and digital payment systems.</li>\n\t<li>Design the farmer-facing SMS confirmation mechanism as a core system component.</li>\n\t<li>Establish data governance protocols covering data ownership, access control, role-based permissions, audit trails, data backup and recovery, and incident response procedures.</li>\n\t<li>Prepare a Data Protection Compliance Plan covering encryption standards for data at rest and in transit, data minimization principles, farmer notice requirements, and the conditions under which a Data Protection Impact Assessment (DPIA) may be required.</li>\n\t<li>Define minimum security standards including role-based access control, multi-factor authentication for system administrators, and explicit data residency requirements.</li>\n\t<li>Submit and obtain PIU written approval of the architecture design before proceeding to Stage 3.</li>\n</ul>\n\n<p>Phase 2: Development, Testing, and Pilot</p>\n\n<p>Estimated Duration: 5 to 7 months</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Stage 3: System Development and User Acceptance Testing (Estimated 3 to 4 months)</strong></p>\n\n<ul>\n\t<li>Develop the full MMTS in accordance with the approved architecture, including all modules for equipment and operator registration, service delivery tracking, demand aggregation, scheduling, farmer confirmation, payment reconciliation, performance dashboards, and supervisory reporting.</li>\n\t<li>Develop mobile field modules for Android and iOS with GPS tracking, real-time service capture, farmer confirmation, and offline data capture with secure synchronization when connectivity is restored.</li>\n\t<li>Build and configure a staging environment that mirrors the production system. All testing must occur in this environment before any deployment to live use.</li>\n\t<li>Prepare a formal User Acceptance Testing manual covering all system modules, user roles, and expected workflows.</li>\n\t<li>Conduct structured UAT sessions with representatives from MoA, RETRAP, AMSC managers, and selected operators. All critical issues identified during UAT must be resolved and retested before deployment.</li>\n\t<li>Obtain written sign-off from the PIU on UAT completion and system acceptance before proceeding to live pilot deployment. No live pilot deployment may occur without this sign-off.</li>\n\t<li>Configure supervision dashboards for MoA oversight, including indicators for service completion rates, private provider performance, revenue recovery, cost per hectare, fuel efficiency, and farmer satisfaction.</li>\n\t<li>Implement exception and risk monitoring mechanisms to detect operational irregularities, equipment underperformance, fuel misuse, and potential fraud.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Stage 4: Pilot Deployment and Learning (Estimated 2 to 3 months)</strong></p>\n\n<p>The pilot is a learning phase. Its purpose is to test the operational model, validate data quality under field conditions, assess user adoption, and evaluate cost recovery before any commitment to national scale-up. Scale-up will not proceed unless the pilot meets clearly defined acceptance criteria.</p>\n\n<ul>\n\t<li>Deploy the MMTS in a maximum of five selected AMSCs. Pilot sites should be selected according to documented criteria covering geographic spread across distinct agro-ecological zones, varying levels of network connectivity, and different stages of AMSC operational maturity. The selection process and criteria must be transparent and recorded.</li>\n\t<li>Test all modules and workflows under real field conditions, including demand aggregation, farmer confirmation via SMS, offline data capture and synchronization, and supervisory dashboard use.</li>\n\t<li>Collect structured feedback from operators, AMSC managers, farmers, and MoA supervisors at regular intervals throughout the pilot.</li>\n\t<li>Monitor system performance against pre-defined pilot acceptance criteria agreed with the PIU at the start of the pilot. These criteria must cover data completeness rates, farmer confirmation response rates, operator adoption levels, system uptime, and at least one measure of economic performance such as cost recovery or cost per hectare.</li>\n\t<li>Prepare a Pilot Learning Report at the end of the pilot phase. This report must assess whether acceptance criteria have been met, document lessons learned, recommend system refinements, and present a go-or-no-go recommendation for national scale-up.</li>\n\t<li>National scale-up will only commence after the PIU formally accepts the Pilot Learning Report and issues written authorization to proceed.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Phase 3: Capacity Building and Institutionalization</p>\n\n<p>Estimated Duration: 2 months, overlapping with the later stages of Phase 2</p>\n\n<p><strong>Stage 5: SOP Finalization and Capacity Building</strong></p>\n\n<ul>\n\t<li>Validate and refine all drafted SOPs based on feedback and lessons learned from the pilot phase, ensuring they are practical, comprehensive, and suitable for use across diverse literacy levels in rural AMSC settings.</li>\n\t<li>Develop a comprehensive training curriculum and deliver structured training programs for AMSC operators, center managers, county agricultural officers, and farmer cooperative representatives, targeting an estimated 50 to 100 individuals across multiple sessions and locations.</li>\n\t<li>Produce a Knowledge Transfer and Transition Plan as a standalone deliverable. This plan must include as a minimum: a full system operations manual, a system administrator guide, a troubleshooting guide, documentation of all Train the Trainer sessions with attendance records, and a schedule for at least two post-handover technical support visits. It must also specify the minimum number of MoA and RETRAP staff trained and certified in each functional category.</li>\n\t<li>Implement a Train the Trainer program targeting 10 to 15 key MoA and RETRAP technical and extension staff to ensure internal capacity for ongoing training, support, and system maintenance after the contract ends.</li>\n\t<li>Develop clear, concise user manuals, visual field job aids, and climate-smart mechanization modules adapted for diverse literacy levels.</li>\n</ul>\n\n<p><strong>Stage 6: Supervision and Performance Framework (Finalized during Phase 3)</strong></p>\n\n<ul>\n\t<li>Establish a multi-tiered supervision hierarchy and protocols for AMSC operations at center, county, and national levels, clearly documenting the roles, responsibilities, and escalation pathways for each level.</li>\n\t<li>Configure automated dashboards providing real-time monitoring of KPIs by level as specified in Section 8, with user-defined filters and visual data representations.</li>\n\t<li>Deliver specialized training to MoA and RETRAP staff on system administration, data analytics, compliance monitoring, and audit trail review.</li>\n\t<li>Document the governance mechanism for managing future system updates, change requests, and bug fixes after contract close, including who has authority to approve changes and how updates will be deployed.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>Phase 4: National Scale-Up and Sustainability</p>\n\n<p>Estimated Duration: Concurrent with Phase 3 planning; rollout commences only after formal PIU acceptance of the Pilot Learning Report</p>\n\n<p><strong>Stage 7: National Rollout Planning and Execution</strong></p>\n\n<ul>\n\t<li>Produce a comprehensive national rollout plan detailing strategies for expansion to all target AMSCs, estimated at 20 to 30 facilities nationally, including infrastructure requirements covering hardware, network connectivity, and hosting, as well as human resource requirements at each level.</li>\n\t<li>Develop financing and cost-recovery strategies for AMSC operations and clear guidelines for integrating private sector participation models such as equipment leasing and public-private partnership frameworks into the MMTS.</li>\n\t<li>Ensure interoperability with other relevant government systems by documenting all API specifications and data exchange standards in formats that are accessible to government technical staff.</li>\n\t<li>Develop and agree a Service Level Agreement (SLA) covering a minimum 12-month warranty and post-handover support period. The SLA must define differentiated response time commitments for critical versus non-critical issues and specify the governance mechanism for managing system updates and change requests after contract close.</li>\n\t<li>Transfer all source code, data models, technical documentation, database schemas, API specifications, user manuals, and administrator guides to MoA and RETRAP at handover, in formats that allow independent government operation and maintenance without any reliance on vendor systems or proprietary licenses.</li>\n</ul>\n\n<p>8. Indicator Framework</p>\n\n<p>To support meaningful performance monitoring and avoid data overload, MMTS indicators are organized into four levels. Activity and output indicators inform operational management. Efficiency and outcome indicators inform strategic decision-making and program evaluation. The system must generate reports at each level for different user roles.</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:183px\">\n\t\t\t<p><strong>Indicator Level</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:597px\">\n\t\t\t<p><strong>Examples</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Activity</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:597px\">\n\t\t\t<p>Number of machines registered, number of operators trained and certified, number of service requests received, number of farmer confirmations sent</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Output</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:597px\">\n\t\t\t<p>Hectares serviced per AMSC per month, number of farmers served, number of services completed by private providers, percentage of requests fulfilled within scheduled timeframe</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Efficiency</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:597px\">\n\t\t\t<p>Cost per hectare serviced, fuel consumed per hectare by equipment type, revenue recovery rate as a percentage of operational cost, equipment utilization rate against target</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Outcome</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:597px\">\n\t\t\t<p>Reduction in average land preparation time compared to baseline, increase in cultivated area in target zones, farmer satisfaction score, percentage of smallholder farmers with access to mechanization services within a defined distance</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>9. Technology, Intellectual Property, and Data Governance Requirements</p>\n\n<p>9.1 Technology Neutrality and Government Transferability</p>\n\n<p>The MMTS must be built on open-source or vendor-neutral foundations. The use of proprietary frameworks that create ongoing licensing obligations, restrict government access to the source code, or prevent independent operation and maintenance is not permitted. Specifically:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>All source code, data models, database schemas, API specifications, configuration files, and technical documentation developed under this contract must be transferred to MoA and RETRAP in full upon handover.</li>\n\t<li>The system must operate without requiring any proprietary licensing fees after the contract closes. Any third-party libraries or frameworks used must be open-source or carry licenses that permit government use without ongoing cost.</li>\n\t<li>The Consultant must document all dependencies and confirm that no component of the system creates a dependency on the vendor or any vendor-affiliated service after handover.</li>\n\t<li>Open API standards must be used throughout so that MoA and RETRAP can independently connect additional systems or migrate to alternative platforms in the future.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>9.2 Intellectual Property</p>\n\n<p>All digital assets developed under this contract are the sole property of the Government of Liberia, represented by MoA and RETRAP, from the moment of their creation. This includes but is not limited to source code, databases, application interfaces, training materials, SOPs, design documents, and any other outputs produced during the performance of this contract. The Consultant retains no ownership rights over any deliverable. Any pre-existing intellectual property incorporated into the system must be disclosed at contract inception, and its use must not impose restrictions on government ownership or operation of the system.</p>\n\n<p>&nbsp;</p>\n\n<p>9.3 Data Protection and Privacy</p>\n\n<p>The MMTS will hold personal data including farmer identity records, GPS location data, transaction history, and operator information. The Consultant must submit a Data Protection Compliance Plan as part of the inception report. This plan must cover:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Encryption standards for all data at rest and in transit, specifying the protocols and key management arrangements.</li>\n\t<li>Role-based access control ensuring that each user category accesses only the data necessary for their function.</li>\n\t<li>Multi-factor authentication for all system administrator accounts.</li>\n\t<li>Explicit data residency requirements, confirming where data will be stored and under what jurisdictional framework.</li>\n\t<li>Data minimization principles, collecting only what is necessary for the stated system purposes.</li>\n\t<li>Farmer notice arrangements, ensuring that farmers whose data is collected are informed in plain language about how their information will be used.</li>\n\t<li>Conditions under which a Data Protection Impact Assessment would be required, and a commitment to conduct one if those conditions are met.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>9.4 Agricultural Data Governance</p>\n\n<p>All farmer data, service data, equipment data, and operational data generated or held within the MMTS is the property of MoA and RETRAP. The Consultant may not use, analyze, monetize, share, or retain any data generated under this contract for any purpose beyond the performance of the contract itself. The system must support data portability, allowing MoA and RETRAP to export all data in open formats including at minimum CSV and JSON. Data classification and governance arrangements must be documented and agreed with MoA as part of the system design stage.</p>\n\n<p>9.5 Hosting Environment</p>\n\n<p>The Consultant must propose a hosting arrangement that supports long-term government ownership. A dedicated subdomain under the Ministry&#39;s official web domain, such as mmts.moa.gov.lr or an equivalent, is the preferred arrangement. The Consultant will be responsible for initial setup of the hosting environment. Long-term hosting costs and infrastructure management will be the responsibility of the Government of Liberia after handover. The Consultant must document all hosting configuration details and transfer them to MoA technical staff as part of the handover package.</p>\n\n<p>10. Duration of the Assignment</p>\n\n<p>The estimated duration of the full assignment is 14 to 16 months from contract signing, depending on the complexity of the registry integration findings and the pace of stakeholder consultations. A more compressed timeline carries significant risk given the scope of integration requirements, the offline functionality demands, the registry readiness uncertainties, and the learning objectives of the pilot. The Consultant will present a detailed implementation plan in the Inception Report, which must be approved by the PIU before work begins.</p>\n\n<p>The indicative phasing is as follows:</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:217px\">\n\t\t\t<p><strong>Phase</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:217px\">\n\t\t\t<p><strong>Stages</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:347px\">\n\t\t\t<p><strong>Indicative Duration</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Phase 1: Design and Readiness</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Stages 1 and 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:347px\">\n\t\t\t<p>10 to 14 weeks</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Phase 2: Development, Testing, and Pilot</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Stages 3 and 4</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:347px\">\n\t\t\t<p>5 to 7 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Phase 3: Capacity Building and Institutionalization</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Stages 5 and 6</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:347px\">\n\t\t\t<p>2 months (overlapping with Phase 2)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Phase 4: National Scale-Up and Sustainability</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Stage 7</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:347px\">\n\t\t\t<p>Commences after Pilot Learning Report acceptance</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>11. Firm Qualification Requirements, Required Expertise, and Key Staff Skills</p>\n\n<p>The firm must demonstrate strong expertise in both general ICT services and specialized agricultural digital systems. It should have at least ten years of proven experience in software development, ICT consultancy, or digital transformation projects, reflecting its capacity to design and deliver complex technology solutions across diverse sectors. In addition, the firm must possess a minimum of seven years of specialized experience in digital technologies, particularly in the design and deployment of management information systems, fleet tracking solutions, or similar national-level agricultural platforms. This combination of broad ICT experience and focused agricultural digital expertise ensures that the selected firm is well positioned to develop and operationalize a robust MMTS tailored to Liberia&#39;s national mechanization needs.</p>\n\n<p>11.1 Minimum Criteria</p>\n\n<p><strong>Digital Platform Development and Integration</strong></p>\n\n<ul>\n\t<li>Proven experience designing and deploying national-level agri-digital platforms such as track and trace systems and fleet monitoring solutions, with demonstrated technical capacity in cloud-based solutions, secure data management, mobile application development for Android and iOS, and robust API development.</li>\n\t<li>Expertise in integrating mechanization tracking within farmer registry systems and government reporting databases, including experience with various database technologies and data exchange protocols.</li>\n\t<li>Experience with GPS-enabled mobile field modules, equipment registry systems, and performance tracking dashboards for agricultural machinery and farmer services.</li>\n\t<li>Strong background in data governance, digital identity verification, and interoperability with payment systems, adhering to international data privacy standards and cybersecurity best practices.</li>\n\t<li>Demonstrated use of open-source or vendor-neutral technology stacks, with evidence that prior systems were fully transferred to government ownership.</li>\n</ul>\n\n<p><strong>Geospatial and Data Analytics</strong></p>\n\n<ul>\n\t<li>Experience in geospatial mapping of farms, mechanization service zones, and asset tracking.</li>\n\t<li>Integration of mechanization services with GIS-enabled agricultural platforms.</li>\n\t<li>Spatial analytics for service coverage, land preparation mapping, and climate-smart agriculture indicators.</li>\n\t<li>Data harmonization with RETRAP reporting structures.</li>\n</ul>\n\n<p><strong>Agricultural Mechanization Operations</strong></p>\n\n<ul>\n\t<li>Extensive practical experience in large-scale farm mechanization, equipment deployment, repair, and maintenance, with a minimum of 8,000 hectares of operational experience.</li>\n\t<li>Expertise in tractor operations, implements calibration, post-harvest machinery, and logistics coordination.</li>\n\t<li>Development of operational workflows, maintenance protocols, and equipment lifecycle management.</li>\n\t<li>Experience in managing and tracking agro-equipment concessions and technical service delivery.</li>\n</ul>\n\n<p><strong>Training and Capacity Building</strong></p>\n\n<ul>\n\t<li>Proven track record in delivering mechanization and agribusiness training programs.</li>\n\t<li>Development of structured operator certification programs.</li>\n\t<li>Experience implementing Train the Trainer models for sustainability, targeting technical and extension staff.</li>\n\t<li>Design of user manuals, field job aids, SOP documentation, and digital literacy training modules adapted for diverse literacy levels in rural environments.</li>\n</ul>\n\n<p><strong>Field Implementation and Stakeholder Engagement</strong></p>\n\n<ul>\n\t<li>Experience deploying digital agriculture systems in rural environments with limited connectivity.</li>\n\t<li>Farmer mobilization, cooperative engagement, and stakeholder coordination experience.</li>\n\t<li>Operationalization of service request mechanisms including mobile, SMS, and hotline channels.</li>\n\t<li>On-ground supervision of pilot sites and workflow validation experience.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>11.2 Key Staff Skills Required</p>\n\n<p>The personnel fielded by the selected firm must meet the following standards. Their roles, academic qualifications, and minimum experience are outlined below:</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:142px\">\n\t\t\t<p><strong>Role</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:183px\">\n\t\t\t<p><strong>Academic Qualification</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:200px\">\n\t\t\t<p><strong>Minimum Experience</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:255px\">\n\t\t\t<p><strong>Responsibilities</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>Project Manager and Team Leader</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Master&#39;s in Agricultural Engineering, ICT for Development, or Project Management</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>10 or more years in agri-digital projects, mechanization service delivery, and institutional strengthening, with at least 5 years in a leadership role.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Overall project coordination, strategic guidance, stakeholder consultations, system design validation, quality assurance, and reporting to RETRAP and MoA.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>System Architect and ICT Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Bachelor&#39;s or Master&#39;s in Computer Science, Information Systems, or Software Engineering</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>7 or more years in national-level agri-digital platforms, API integration, GPS-enabled mobile modules, cloud infrastructure, and cybersecurity principles.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Design, develop, and deploy the MMTS; ensure robust integration with RETRAP database and MoA systems; manage technical infrastructure and open-source framework compliance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>Mechanization Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Bachelor&#39;s or Master&#39;s in Agricultural Engineering or Mechanical Engineering</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>8 or more years in tractor operations, implements calibration, post-harvest machinery, and mechanization services.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Develop equipment registry, operational workflows, maintenance protocols, and lifecycle management; provide technical input for system functionality related to mechanization.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>Training and Capacity Building Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Bachelor&#39;s in Education, Agricultural Extension, or HR Development</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>5 or more years in operator training, Train the Trainer programs, and SOP documentation, preferably in rural agricultural settings.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Develop comprehensive training materials, user manuals, and job aids; deliver training programs; certify operators and supervisors; establish Train the Trainer program; and coordinate Knowledge Transfer and Transition Plan.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>Data Governance and Monitoring Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Master&#39;s in Data Science, Statistics, or Public Administration with ICT specialization</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>7 or more years in data governance, digital identity verification, dashboard development, data analytics, and data privacy regulations.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Configure dashboards and reporting tools; establish the supervision framework; ensure data quality, compliance, and risk monitoring; develop data classification and usage guidelines.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:142px\">\n\t\t\t<p>GIS and Spatial Analyst</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:183px\">\n\t\t\t<p>Bachelor&#39;s or Master&#39;s in Geospatial Science, Agriculture, or Environmental Studies</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:200px\">\n\t\t\t<p>5 or more years in GIS-enabled agricultural platforms, spatial analytics, farm mapping, remote sensing, and spatial database management.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:255px\">\n\t\t\t<p>Lead geospatial mapping of farms and service zones; integrate climate-smart agriculture indicators; provide spatial data analysis for service coverage and impact reporting.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>12. Reporting Requirements</p>\n\n<ul>\n\t<li>Inception Report: Due within 3 weeks of contract signing. Must include the refined work plan, system design specifications, technical architecture, National Farmer Registry Readiness Assessment findings and go-or-no-go recommendation, Data Protection Compliance Plan, and clarification of device procurement arrangements.</li>\n\t<li>Monthly Progress Reports: Covering technical progress, environmental, social, health and safety status, financial status, and any emerging risks.</li>\n\t<li>UAT Completion Report: Documenting test results, issues resolved, and formal PIU sign-off on system readiness for pilot deployment.</li>\n\t<li>Pilot Learning Report: Issued at the end of the pilot phase. Must assess performance against agreed acceptance criteria, document lessons learned, recommend system refinements, and make a go-or-no-go recommendation for national scale-up.</li>\n\t<li>Training Completion Report: Issued after all training sessions are complete, including attendance records and certification status.</li>\n\t<li>Final Implementation Report: A comprehensive overview of project execution, outcomes, system performance, lessons learned, and recommendations for ongoing governance and future development.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>13. Key Deliverables</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:50px\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:217px\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:513px\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Inception Report with Registry Readiness Assessment</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Refined work plan, system design specifications, architecture overview, Registry Readiness Assessment with go-or-no-go decision, Data Protection Compliance Plan, and device procurement clarification.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Approved System Architecture and Data Design</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Full architecture documentation, data models, hosting plan, API specifications, security design, and governance protocols, accepted in writing by the PIU before development begins.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>MMTS Developed and UAT-Certified</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Fully functional system including all modules, dashboards, mobile field tools, farmer confirmation SMS mechanism, and staging environment. Accompanied by UAT manual, test results, and written PIU sign-off.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Pilot Deployment and Learning Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Live system operation in up to five AMSCs, with structured feedback, performance data, and a Pilot Learning Report containing a go-or-no-go recommendation for scale-up.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>SOP Manual</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Finalized, validated, and user-friendly manual for all mechanization center operations, refined based on pilot learning.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Supervision and Performance Management Framework</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Fully configured dashboards, supervisory reporting tools, risk and exception monitoring, and a documented governance mechanism for ongoing system management.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Knowledge Transfer and Transition Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Operations manual, system administrator guide, troubleshooting guide, Train the Trainer session records, certified staff list by category, and post-handover support schedule.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>National Rollout Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Strategic plan for expanding MMTS to all target AMSCs, including infrastructure, human resource, and financing requirements.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Service Level Agreement</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Agreed SLA covering a minimum 12-month post-handover support period with differentiated response commitments for critical and non-critical issues.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:50px\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:217px\">\n\t\t\t<p>Final Implementation and Performance Report</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:513px\">\n\t\t\t<p>Comprehensive report on project execution, system performance, outcomes, challenges, and recommendations.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>14. Payment Schedule</p>\n\n<p>The payment structure has been streamlined to four clearly defined milestones, each linked to specific deliverables and subject to formal PIU acceptance. Acceptance criteria for each milestone will be documented in the contract and agreed before signing. The following schedule applies:</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:6.5in\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:233px\">\n\t\t\t<p><strong>Milestone</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:400px\">\n\t\t\t<p><strong>Deliverable Basis</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e8f5; border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:1px solid #aaaaaa; width:147px\">\n\t\t\t<p><strong>Payment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:233px\">\n\t\t\t<p>Milestone 1: Inception and Architecture</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:400px\">\n\t\t\t<p>Acceptance of the Inception Report including the Registry Readiness Assessment and the approved System Architecture and Data Design.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:147px\">\n\t\t\t<p>15%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:233px\">\n\t\t\t<p>Milestone 2: System Development and UAT</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:400px\">\n\t\t\t<p>PIU written sign-off on UAT completion and system readiness for live pilot deployment.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:147px\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:233px\">\n\t\t\t<p>Milestone 3: Pilot Completion, Capacity Building, and SOP</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:400px\">\n\t\t\t<p>Acceptance of the Pilot Learning Report, SOP Manual, Training Completion Report, and Knowledge Transfer and Transition Plan.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:147px\">\n\t\t\t<p>35%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:1px solid #aaaaaa; border-right:1px solid #aaaaaa; border-top:none; width:233px\">\n\t\t\t<p>Milestone 4: National Rollout and Final Handover</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:400px\">\n\t\t\t<p>Acceptance of the National Rollout Plan, National Scale-Up execution, Final Implementation Report, Service Level Agreement, and full transfer of all source code and documentation to MoA and RETRAP.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #aaaaaa; border-left:none; border-right:1px solid #aaaaaa; border-top:none; width:147px\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Payments will only be made upon formal written acceptance of the relevant milestone deliverables by the PIU. The PIU will review and respond to submitted deliverables within 15 working days of receipt. Where deliverables do not meet agreed acceptance criteria, the Consultant will be given a defined period to revise and resubmit before payment is released.</p>\n\n<p>15. Submission Requirements</p>\n\n<p>Interested firms are invited to submit detailed information demonstrating their qualifications and relevant experience to deliver the required services. Submissions should include evidence of the firm&#39;s track record, technical expertise, equipment inventory, and understanding of the assignment, along with the proposed methodology and curriculum vitae of key staff to be engaged. Firms must also provide proof of demonstrable experience in developing monitoring and management systems that enhance equipment utilization, performance tracking, and service delivery to farmers through mechanization.</p>\n\n<p>&nbsp;</p>\n\n<p>The assignment will be procured using the Quality and Cost-Based Selection (QCBS) method in accordance with World Bank Procurement Regulations. Only firms meeting the minimum criteria outlined in Section 11 will be considered for evaluation.</p>\n\n<p>&nbsp;</p>\n\n<p>For further information, interested firms may contact:</p>\n\n<p>Mr. Galah Toto</p>\n\n<p>National Program Coordinator</p>\n\n<p>Tel: +231777576980/+231886576980</p>\n\n<p>Email: gtoto@moa.gov.lr</p>\n\n<p>Ministry of Agriculture, Republic of Liberia</p>\n\n<p>Rural Economic Transformation Project (RETRAP) Coordination Unit</p>\n\n<p>Monrovia, Liberia</p>\n\n<p>&nbsp;</p>"},{"id":"OP00443824","notice_type":"Contract Award","noticedate":"08-May-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Cote d'Ivoire","project_id":"P177800","project_name":"Côte d'Ivoire Strengthening Basic Education System Operation","bid_reference_no":"CI-BCPENA-536514-GO-RFQ","bid_description":"Acquisition d’équipements et applications de sécurité (Windows Server 2022 DataCenter 24 Cores, Certificat SSL OV, Pare-feu Pare-feu Fortinet FortiGate 400F Protection Plus )","procurement_group":"GO","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","submission_date":"2026-05-08T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P177800-Côte d'Ivoire Strengthening Basic Education System Operation<br/><b>Loan/Credit/TF Info:</b>IDA-72560<br/><b>Bid/Contract Reference No:</b>CI-BCPENA-536514-GO-RFQ<br/><b>Procurement Method:</b>RFQ-Request for Quotations<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>CONTRAT POUR LA FOURNITURE, L’INSTALLATION DES EQUIPEMENTS ET APPLICATION DE SECURITE Y COMPRIS LA FORMATION DE DIX (10) AGENTS DE LA DTSI - MINISTERE EN CHARGE DE L’EDUCATION NATIONALE</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/05/04<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>90 Day(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>SCB TRADING (766079)</b><br/>Koumassi - Bld VGE Immeuble la paix 10 BP 1729 Abidjan 10 Tel: 27 21 36 02 79 / 07 49 26 25 94 scbtrading@yahoo.fr<br/>Country: Cote d'Ivoire<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>XOF 33000000<br/><br/>Evaluated Bid Price<br/>XOF 34000000</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>XOF 34000000</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>OAZIS SA (766094)</b><br/>Cocody ,Deux plateaux, rue des jardins Tél : 27 22 41 67 37 / 07 07 48 84 73 E-mail: info@oazis.ci / issiakatoure@oazis.ci \nwww.oazis.ci<br/>Country: Cote d'Ivoire<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>XOF 44120200<br/><br/>Evaluated Bid Price<br/>XOF 44120200</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>PORDES (438400)</b><br/>09 BP 256 Abidjan 09\n info@pordes.net mkeita@pordes.net<br/>Country: Cote d'Ivoire<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>XOF 82156362<br/><br/>Evaluated Bid Price<br/>XOF 82156362</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>LIBRAIRIE DE FRANCE GROUPE (565265)</b><br/>Plateau, Avenue Chardy, Immeuble Alpha 2000\n01 BP 228 ABIDJAN 01 - Tél: 27 20 30 63 63 / 0747051268\nE-mail: ttyty@ldfgroupe.com\t<br/>Country: Cote d'Ivoire<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>XOF 79159681<br/><br/>Evaluated Bid Price<br/>XOF 79159681</div></br></div><br/></div></div>"},{"id":"OP00443244","notice_type":"Contract Award","noticedate":"06-May-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Ethiopia","project_id":"P177881","project_name":"Ethiopia Education and Skills for Employability Project","bid_reference_no":"ET-MOLS-501377-GO-RFP","bid_description":"Support TVET reform policy through building the capacity of Regional Center of Competencies through the provision of ICT Infrastructures to ensure Training and Assessment Quality.","procurement_group":"GO","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","submission_date":"2026-05-06T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P177881-Ethiopia Education and Skills for Employability Project<br/><b>Loan/Credit/TF Info:</b>IDA-74200<br/><b>Bid/Contract Reference No:</b>ET-MOLS-501377-GO-RFP<br/><b>Procurement Method:</b>RFP-Request for Proposals<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Support TVET reform policy through building the capacity of the Regional Center of Competencies through the provision of ICT Infrastructures to ensure Training and Assessment Quality</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/02/04<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>6 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>\tHIWING INFORMATION AND TECHNOLOGY CO., LTD., (1043541)</b><br/>Beijing, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>ETB<br/><br/>Evaluated Bid Price<br/>ETB 1048380423.31</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>USD 6789874.00; ETB 3080000.00</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>\tHIWING INFORMATION AND TECHNOLOGY CO., LTD., (1043541)</b><br/>Form Date: 06-MAY-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Wang Jun</td><td>CN</td><td>China</td><td>Directly or indirectly holding 25% or more of the shares</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>•\tCUBEAPEX TECHNOLOGY(SHENZHEN) CO., LTD. (1043515)</b><br/>China, Shenzhen.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>ETB<br/><br/>Evaluated Bid Price<br/>ETB 1065679378.43</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>UNISITS TECHNOLOGY CO., LTD (736774)</b><br/>Beijing, China<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>ETB<br/><br/>Evaluated Bid Price<br/>ETB 1100716899.48</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>•\tCHENGDU MAIPU INTERNATIONAL INFOTECH CO.,LTD., (1043543)</b><br/>Chen du, China.<br/>Country: China<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>ETB<br/><br/>Evaluated Bid Price<br/>ETB 1090444274.91</div></br></div><br/></div></div>"},{"id":"OP00442928","notice_type":"Request for Expression of Interest","noticedate":"05-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-05-16T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P176517","project_name":"De-risking, inclusion and value enhancement of pastoral economies in the Horn of Africa","bid_reference_no":"SO-MOF-529702-CS-INDV","bid_description":"Information and Communication Technology (ICT) Advisor DRIVE Project","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Shangani District - Mogadishu, Somalia","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"abisosman@gmail.com","contact_name":"Abukar  Osman","contact_organization":"Federal Government of Somalia Ministry of Finance","contact_phone_no":"+252 617635244","submission_date":"2026-05-05T00:00:00Z","notice_text":"<p><strong><strong>FEDERAL GOVERNMENT OF SOMALIA</strong></strong></p>\n\n<p><strong><strong>MINISTRY OF FINANCE</strong></strong></p>\n\n<p><strong><strong>REQUEST FOR EXPRESSION OF INTEREST (REOI)</strong></strong></p>\n\n<p><strong><strong>COUNTRY:</strong></strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Federal Republic of Somalia (FGS)</p>\n\n<p><strong><strong>NAME OF PROJECT</strong></strong>: De-Risking, Inclusion and Value Enhancement of pastoral economies in the Horn of Africa Project (DRIVE)</p>\n\n<p>&nbsp;<strong><strong>PROJECT ID:</strong></strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;P176517.</p>\n\n<p><strong><strong>Assignment Title</strong></strong>: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;ICT Advisor DRIVE Project.</p>\n\n<p><strong><strong>Individual/Firm:</strong></strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Individual Consultant</p>\n\n<p><strong><strong>Deadline:</strong></strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;16th&nbsp;May 2026</p>\n\n<p><strong><strong>Reference No.:</strong></strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<strong><strong>SO-MOF-529702-CS-INDV</strong></strong></p>\n\n<p>The Government of the Federal Republic of Somalia has received financing from the World Bank toward the cost of De-Risking, Inclusion and Value Enhancement of pastoral economies in the Horn of Africa Project (DRIVE) and intends to apply part of the proceeds of the above project to finance the position of ICT Advisor DRIVE Project.</p>\n\n<p>To ensure the effective implementation and management of the &nbsp;National Single Window System (NSWS) and the Trade Information Portal, the&nbsp;Project&nbsp;is seeking an experienced and qualified ICT Advisor&nbsp;to take on this critical role. The ICT Advisor&nbsp;will be responsible for overseeing the planning, development, implementation, and maintenance of these systems, ensuring their alignment with national policies, international standards, and best practices in trade facilitation.</p>\n\n<p>The ICT Advisor&nbsp;will work closely with various stakeholders within the ministry, including relevant departments, technical teams, and trade partners. Through their expertise and leadership, the ICT Advisor&nbsp;will drive the successful adoption and utilization of the National Single Window System (NSWS) and Trade Information Portal, transforming trade operations, promoting efficiency, and fostering economic growth in Somalia.</p>\n\n<p>As part of this initiative, the Project&nbsp;is committed to hiring an ICT Specialist with a strong background in systems development, project management, and trade facilitation. The incumbent should possess extensive knowledge of trade processes, customs regulations, and international standards, along with proven experience in delivering successful ICT projects. With a focus on innovation and collaboration, the ICT Specialist will shape the future of trade in Somalia, positioning the country as a regional leader in trade facilitation.</p>\n\n<p>The ICT Advisor&nbsp;will play a pivotal role in the successful implementation of the National Single Window System (NSWS) and Trade Information Portal for the Ministry of Commerce and Industry in Somalia. the ICT Specialist will be responsible for leading and managing all aspects of these systems, ensuring their seamless integration with existing trade processes and systems.</p>\n\n<p>The ICT Advisor&nbsp;will play also a fundemetal role on The Livestock Information and Traceability System (LITS) as it is a digital platform designed to register, monitor, and track livestock throughout the value chain. It enables accurate identification and movement tracing of animals from farms to markets and export points. By improving transparency and disease surveillance, LITS supports Somalia&rsquo;s compliance with international livestock trade and health standards. Also The&nbsp;Livestock Market Information System (LMIS)&nbsp;which is a digital platform that collects, analyzes, and shares real-time market data for livestock across key markets and regions. It provides information on livestock prices, market volumes, demand trends, and trade flows to help producers, traders, exporters, and policymakers make informed decisions. And finally,&nbsp;the support given to the upcoming&nbsp;Integrated Management Information System (IMIS)&nbsp;is a digital platform used by national standards bodies to manage and automate their core functions, including standards development, metrology, conformity assessment, and certification services. It centralizes data, streamlines workflows, and improves traceability and access to services for businesses and regulators. For SOBS, IMIS enhances efficiency, transparency, and coordination across all quality infrastructure operations.</p>\n\n<p><strong><strong>Duration:</strong></strong>&nbsp;The proposed duration for the assignment is Twelve Months (12) calendar months from starts date.</p>\n\n<p>The detailed Terms of Refence (TOR) for the assignment can be found at the following website:</p>\n\n<p><u><u>https://moci.gov.so/wp-content/uploads/2026/04/ICT-Adviser-ToR-DRIVE.pdf</u></u><u><u>,</u></u>&nbsp;&nbsp;</p>\n\n<p><strong><strong>Key Tasks and Responsibility</strong></strong></p>\n\n<p>The ICT Advisor&nbsp;will be responsible for the following key activities and tasks in relation to the&nbsp;National Single Window System (NSWS), Trade Information Portal (STIP), Logistics Management Information System (LMIS), Integrated Market Information System (IMIS),&nbsp;and&nbsp;Legal/Regulatory Inform ation and Trade System (LITS):</p>\n\n<p><strong><strong>Conducting a thorough analysis of existing trade and information systems:</strong></strong></p>\n\n<ul>\n\t<li>Identify current workflows, procedures, and documentation requirements across NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Analyze the strengths, weaknesses, opportunities, and threats of the existing systems and trade processes.</li>\n\t<li>Conduct stakeholder consultations to gather input and understand the requirements and expectations for each system.</li>\n</ul>\n\n<p><strong><strong>Developing a detailed project plan and implementation strategy:</strong></strong></p>\n\n<ul>\n\t<li>Define the scope and objectives for the implementation and integration of NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Develop a comprehensive project plan with timelines, milestones, and deliverables for all systems.</li>\n\t<li>Create an efficient implementation strategy outlining the steps and activities required for successful deployment and system integration.</li>\n</ul>\n\n<p><strong><strong>Managing and coordinating the efforts of a project team:</strong></strong></p>\n\n<ul>\n\t<li>Recruit and manage a team of experts, including IT professionals and subject matter specialists for NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Allocate tasks and responsibilities to team members based on their skills and expertise.</li>\n\t<li>Maintain effective communication channels within the team, ensuring collaboration and knowledge sharing across all systems.</li>\n</ul>\n\n<p><strong><strong>Overseeing the technical aspects of the project:</strong></strong></p>\n\n<ul>\n\t<li>Collaborate with IT teams to ensure NSWS, STIP, LMIS, IMIS, and LITS are implemented using the most suitable technologies and platforms.</li>\n\t<li>Develop technical specifications and requirements for system development, customization, and interoperability.</li>\n\t<li>Ensure compliance with industry best practices, security standards, and data protection regulations.</li>\n</ul>\n\n<p><strong><strong>Collaborating with internal and external stakeholders:</strong></strong></p>\n\n<ul>\n\t<li>Engage relevant departments, government agencies, and trade partners to understand their needs and requirements for each system.</li>\n\t<li>Build strong relationships with stakeholders and maintain effective communication throughout the implementation process.</li>\n\t<li>Facilitate workshops, seminars, and training sessions to raise awareness and gather feedback on all systems.</li>\n</ul>\n\n<p><strong><strong>Providing training and support to end-users:</strong></strong></p>\n\n<ul>\n\t<li>Develop comprehensive training programs and materials for end-users of NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Conduct training workshops to ensure users are familiar with system functionality and processes.</li>\n\t<li>Provide ongoing technical support to address challenges and system issues.</li>\n</ul>\n\n<p><strong><strong>Monitoring the performance of the systems:</strong></strong></p>\n\n<ul>\n\t<li>Continuously monitor and evaluate NSWS, STIP, LMIS, IMIS, and LITS against defined key performance indicators (KPIs).</li>\n\t<li>Conduct regular system audits to identify potential areas for improvement.</li>\n\t<li>Address technical issues or bottlenecks to ensure smooth operation and system availability.</li>\n</ul>\n\n<p><strong><strong>Conducting regular evaluations:</strong></strong></p>\n\n<ul>\n\t<li>Develop mechanisms to assess the impact and effectiveness of NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Prepare periodic progress reports and present findings to management and relevant stakeholders.</li>\n\t<li>Provide recommendations for system enhancements and continuous improvements.</li>\n</ul>\n\n<p><strong><strong>Keeping abreast of emerging technologies and industry trends:</strong></strong></p>\n\n<ul>\n\t<li>Stay updated with the latest trends and advancements in ICT, trade facilitation, and market information systems.</li>\n\t<li>Explore possibilities for integrating emerging technologies into NSWS, STIP, LMIS, IMIS, and LITS.</li>\n\t<li>Share knowledge and insights with stakeholders to promote innovation and continuous improvement.</li>\n</ul>\n\n<p>More specifically:</p>\n\n<p><strong><strong>&nbsp;Livestock Identification and Traceability System (LITS)</strong></strong></p>\n\n<ul>\n\t<li>Diagnostic and design:\n\t<ul>\n\t\t<li>Define and implement functional requirements, data standards, and governance (unique ID schema, event model, movement recording, health/lab interface, audit trails).</li>\n\t\t<li>Develop &nbsp;and implement enterprise architecture and data model (central registry, role-based access, API layer, offline-first/mobile capture).</li>\n\t</ul>\n\t</li>\n\t<li>Technology and implementation:\n\t<ul>\n\t\t<li>Design interfaces to veterinary services, labs, border posts, feedlots/slaughterhouses, and residue testing databases.</li>\n\t</ul>\n\t</li>\n\t<li>Policy and operating model:\n\t<ul>\n\t\t<li>Advise on regulatory instruments (mandatory tagging/movement reporting, data privacy, compliance), SOPs, and institutional roles.</li>\n\t\t<li>Develop user manuals, training materials, and helpdesk procedures.</li>\n\t</ul>\n\t</li>\n\t<li>Rollout and sustainability:\n\t<ul>\n\t\t<li>Pilot in selected regions/value chains; iterate based on user feedback.</li>\n\t\t<li>Define KPIs (coverage, compliance, data quality, timeliness) and monitoring framework.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong><strong>National Single Window (NSW) Integration </strong></strong>Data exchange and interoperability:</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Map required permits, certificates (e.g., animal health, veterinary export), and risk assessment data to NSW services.</li>\n\t\t<li>Specify data exchange standards (REST/JSON, XML, UN/CEFACT) and authentication/authorization (PKI, OAuth2).</li>\n\t</ul>\n\t</li>\n\t<li>Process digitization:\n\t<ul>\n\t\t<li>Re-engineer workflows for online applications, e-payment, e-signatures, issuance, and verifiable digital certificates (with QR/secure hashes).</li>\n\t\t<li>Propose master data management (establishment registry, officer registry) and service catalog.</li>\n\t</ul>\n\t</li>\n\t<li>Governance and cybersecurity:\n\t<ul>\n\t\t<li>Define SLAs, data sharing MoUs, and incident response plans.</li>\n\t\t<li>Ensure compliance with national cybersecurity and data protection frameworks.</li>\n\t\t<li><strong><strong>Livestock Market Information System (LMIS)</strong></strong></li>\n\t</ul>\n\t</li>\n\t<li>System design:\n\t<ul>\n\t\t<li>Implement and coordinate data collection methodology (market enumerators, trader submissions, integration with digital platforms), sampling, validation rules, and frequency.</li>\n\t\t<li>Architect data pipeline (ETL), analytics dashboards, and public dissemination channels (web, USSD/SMS, mobile apps).</li>\n\t</ul>\n\t</li>\n\t<li>Operations and quality assurance:\n\t<ul>\n\t\t<li>Implement SOPs for data capture, plausibility checks, outlier handling, and version control.</li>\n\t\t<li>Introduce feedback loops with market actors; publish metadata and methodology notes.</li>\n\t</ul>\n\t</li>\n\t<li>Inclusion and access:\n\t<ul>\n\t\t<li>Design multilingual, low-bandwidth user interfaces; incorporate accessibility features.</li>\n\t\t<li>Establish open data APIs and licensing for transparent reuse.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong><strong>&nbsp;Cross-cutting ICT Advisory</strong></strong></p>\n\n<ul>\n\t<li>Infrastructure readiness assessment (connectivity, power, device availability) and mitigation measures (offline sync, solar kits).</li>\n\t<li>Cybersecurity baseline and controls (encryption at rest/in transit, key management, auditing, role-based access).</li>\n\t<li>Change management and capacity building:\n\t<ul>\n\t\t<li>Training plans for officials, vets, enumerators, and farmers; digital literacy modules.</li>\n\t\t<li>Communications strategy to drive adoption and compliance.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>The ICT Specialist will be accountable for delivering these responsibilities efficiently and effectively, ensuring the successful implementation, integration, and continuous improvement of NSWS, STIP, LMIS, IMIS, and LITS in alignment with the Ministry of Commerce and Industry&#39;s goals and objectives.</p>\n\n<p><strong><strong>Selection Criteria:</strong></strong>&nbsp;The selection will be based on qualification, experience and skills of the candidate and followed by an interview. The qualifications, experience and competencies include:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Minimum Master&rsquo;s degree in computer science, information technology, or a related academic and work experience.</li>\n\t<li>Proven experience in ICT systems and implementation, with at least 5 years of relevant work experience. Experience in trade facilitation or single window projects will be highly beneficial.</li>\n\t<li>Strong understanding of trade processes, customs regulations, and international standards related to trade facilitation, such as the World Trade Organization&#39;s Trade Facilitation Agreement.</li>\n\t<li>Proficiency in programming languages and database management, with hands-on experience in system integration.</li>\n\t<li>8&ndash;10 years in designing and implementing sector ICT systems, preferably in agriculture/livestock.</li>\n\t<li>Proven experience with animal identification/traceability and alignment to international guidance (WOAH/OIE, Codex/food safety) a plus.</li>\n\t<li>Hands-on with NSW or similar trade facilitation platforms and government interoperability frameworks&nbsp;a plus</li>\n\t<li>Building LMIS or similar market/price information systems; mobile-first, low-connectivity contexts a plus.</li>\n\t<li>Systems integration (APIs, microservices), cybersecurity, data governance.</li>\n\t<li>Experience working with government, donors, and multi-stakeholder environments; strong change management.</li>\n\t<li>&nbsp;</li>\n\t<li>Excellent analytical, problem-solving, and project management skills. Ability to effectively prioritize tasks and allocate resources for timely project execution.</li>\n\t<li>Strong communication and interpersonal skills, with the ability to effectively collaborate with cross-functional teams and stakeholders at various levels.</li>\n\t<li>Demonstrated ability to work independently and take initiative, with a high level of self-motivation and commitment to achieving targets and objectives.</li>\n\t<li>Up-to-date knowledge of relevant ICT frameworks, industry best practices, and security protocols.</li>\n\t<li>Familiarity with emerging technologies such as cloud computing, big data analytics, and blockchain will be an advantage.</li>\n\t<li>Ability to adapt to changing requirements and dynamic work environments, demonstrating flexibility and resilience.</li>\n\t<li>Excellent written and verbal communication skills in English. Knowledge of Somali language will be an added advantage.</li>\n\t<li>Support the integration and interoperability of systems across the DRIVE Project, including the Single Window, Customs System, LITS, LMIS, IMIS, and other related platforms.</li>\n\t<li>Experience providing technical support to&nbsp;LITS, LMIS, IMIS, and related digital livestock and market systems.</li>\n\t<li>Experience in&nbsp;developing and rolling out digital certification systems<strong><strong>, </strong></strong>including the<strong>&nbsp;</strong>Digital Unified Export Certificate<strong><strong>.</strong></strong></li>\n\t<li>Experience in&nbsp;strengthening trade portals&nbsp;and supporting&nbsp;National Single Window (NSWS)&nbsp;implementation.</li>\n\t<li>Ability to&nbsp;integrate and ensure interoperability&nbsp;across multiple systems (NSWS, customs, LITS, LMIS, IMIS).</li>\n\t<li>Strong understanding of&nbsp;ICT project management, system integration, and digital trade facilitation<strong>&nbsp;</strong>in government or large-scale projects.</li>\n</ul>\n\n<p>The Ministry of Ministry of Finance now invites eligible consulting (&ldquo;Consultants&rdquo;) to indicate their interest in providing the above-mentioned Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services and furnish the Curriculum Vitae (CV).</p>\n\n<p>Attention of interested Consultants is drawn to section III, para 3.14,3.16 &amp; 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services dated in September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. &nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations.</p>\n\n<p>Interested Consultant may obtain further information (in person or by e-mail) at the address below during office hours from 8.00 a.m.&ndash; 4.00 p.m. Saturday to Thursday except on public holidays.</p>\n\n<p><strong><strong>Deadline for submission</strong></strong>: Expressions of interest should be delivered in a written form to the address below (in person, or by e-mail: <u><u>bid.drive@piu.mof.gov.so</u></u>, &nbsp;) by <strong><strong>1</strong></strong><strong><strong>6</strong></strong><strong><strong>th</strong></strong><strong>&nbsp;</strong><strong><strong>Ma</strong></strong><strong><strong>y </strong></strong><strong><strong>&nbsp;2026 4:00PM</strong></strong>. local Time.</p>\n\n<p>Attention</p>\n\n<p>Project Coordinator,</p>\n\n<p>DRIVE Project,</p>\n\n<p>Ministry of Finance - Federal Government of Somalia</p>\n\n<p>Shangani District - Mogadishu, Somalia</p>\n\n<p>Email Address: <u><u>bid.drive@piu.mof.gov.so</u></u>,</p>"},{"id":"OP00442537","notice_type":"Request for Expression of Interest","noticedate":"03-May-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-05-21T00:00:00Z","submission_deadline_time":"02:00","project_ctry_name":"Somalia, Federal Republic of","project_id":"P177298","project_name":"Somalia Enhancing Public Resource Management Project","bid_reference_no":"SO-MOF-SL-540884-CS-CQS","bid_description":"Consultancy Services for the Procurement and Installation of Audit Management Software for the National Audit Office of Somaliland (NAO)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Hargeisa, Somaliland","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"Mohamoud.omer@outlook.com","contact_name":"Mohamoud Hussein","contact_organization":"Ministry of Finance, Government of Somaliland","contact_phone_no":"634420527","submission_date":"2026-05-03T00:00:00Z","notice_text":"<p>Request for Expressions of Interest (REOI)</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:666px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:16px; width:180px\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:16px\">\n\t\t\t<p>Hargeisa, Somaliland</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:15px; width:180px\">\n\t\t\t<p>Project Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:15px\">\n\t\t\t<p>Somali Enhancing Public Resource Management Project</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:16px; width:180px\">\n\t\t\t<p>Reference No</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:16px\">\n\t\t\t<p>SO-MOF-SL-540884-CS-CQS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:16px; width:180px\">\n\t\t\t<p>Place of Assignment</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:16px\">\n\t\t\t<p>Hargeisa, Somaliland</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:16px; width:180px\">\n\t\t\t<p>Project ID</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:16px\">\n\t\t\t<p>P177298&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; IDA-E1360</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:16px; width:180px\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; height:16px\">\n\t\t\t<p>Consultancy Services for the Procurement of Audit Management Software for the National Audit Office of Somaliland (NAO)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;Background</p>\n\n<p>The Government of Somaliland has received&nbsp;financing from the World Bank toward the cost of Enhancing Public Resource Management Project (SERP) and intends to apply part of the proceeds for consulting services.</p>\n\n<p>The Consulting Services (the Services) include: (i) available APIs/connectors or supported data exchange formats, (ii) data access permissions and approval controls, (iii) security controls (authentication, encryption, logging), (iv) audit trails for data extraction and use, and (v) any assumptions or prerequisites required from NAO or the host institutions.</p>\n\n<p>The consultant will undertake all the specific tasks detailed out in the Terms of Reference (TOR). The consultancy service is expected to be conducted and reports delivered within 12 months from contract commencement.</p>\n\n<p>The detailed Terms of Refence (TOR) for the assignment can be found at the following website: https://www.slmof.org &nbsp;or&nbsp;it can be provided upon submission of application in person or by e-mail. The e-mail address is provided below.</p>\n\n<p>The Somaliland Ministry of Finance and Economic Development (MoF&amp;ED) now invites the eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. (Brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.).&nbsp;&nbsp;</p>\n\n<p><strong><em>The short-listing criteria are as follows:</em></strong></p>\n\n<ol>\n\t<li>Core business of the firm and at least 7 years in business (experience in ICT/software implementation, with a strong focus on the design, configuration, deployment, and support of integrated systems.</li>\n\t<li>Experience of conducting similar assignments (Completion of at least three (3) public sector software implementation assignments of comparable scale and complexity including system configuration, deployment and user training).</li>\n\t<li>Experience of similar environments in working with government institutions, public financial management entities, or supreme audit institutions.</li>\n\t<li>The technical and managerial organization of the firm. (Provide only the structure of the organization. Do not provide CVs of staff). Key experts will not be evaluated at the shortlisting stage.</li>\n</ol>\n\n<p>The attention of interested Consultants is drawn to paragraphs 3.14, 3.16 and 3.17 of the World Bank&rsquo;s&nbsp;<em><u>Procurement Regulations for IPF Borrowers: Procurement in Investment Financing - Goods, Works, Non-Consulting and Consulting Services</u></em>&nbsp;dated July 2016 and revised in November 2017 August 2018, November 2020, September 2023. (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>Consultants may associate with other firms to enhance their qualification but should indicate clearly whether the association is in the form of a joint venture and/or a sub consultancy. In case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>A Consultant will be selected in accordance with the&nbsp;Consultant Qualification Selection (CQS) method set out in the World Bank&rsquo;s Procurement Regulations.</p>\n\n<p>Interested Consultant may obtain further information at the address below during office hours from&nbsp;8:30 a.m. to 2:30 p.m.&nbsp;Hargeisa time (Excluding public holidays).</p>\n\n<p>Expressions of interest (EOI) should be delivered (by e-mail or in person) in a written form in three (3) hard copies (if not by e-mail) to the address below by 21st May 2026 at 2:00 p.m. Hours (Hargeisa Time).</p>\n\n<p>&nbsp;</p>\n\n<p>SERP Project Implementation Unit, Ministry of Finance &amp; Economic Development</p>\n\n<p>2nd Floor, PFM Building, Opp. of the Ministry of Education&nbsp;and Science</p>\n\n<p>Hargeisa, Government of Somaliland</p>\n\n<p>Email: to: procurementserp@gmail.com&nbsp; cc: mohamoud.omer@outlook.co</p>"},{"id":"OP00442277","notice_type":"Contract Award","noticedate":"30-Apr-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nigeria","project_id":"P167183","project_name":"Nigeria Digital Identification for Development Project","bid_reference_no":"NG-ECSU-441190-CS-CQS","bid_description":"Consultancy to develop Data Sharing Framework","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","submission_date":"2026-04-30T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P167183-Nigeria Digital Identification for Development Project<br/><b>Loan/Credit/TF Info:</b>IDA-65270<br/><b>Bid/Contract Reference No:</b>NG-ECSU-441190-CS-CQS<br/><b>Procurement Method:</b>CQS-Consultant Qualification Selection<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>ENGAGEMENT OF A CONSULTANCY FIRM TO DEVELOP AN IDENTITY DATA AUTHENTICATION AND VERIFICATION FRAMEWORK</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/04/22<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>7 Month(s)<br/></div><div class='col-sm-4'><b>Minimum Qualifying Score</b><br/><br/>70</div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Firm(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='row col-sm-12'><div class='col-sm-6'><b>DUALE, OVIA & ALEX-ADEDIPE (1084183)</b><br/>1st Floor, AP Plaza, 100 Adetokunbo Ademola Crescent, Wuse 2, FCT, Nigeria.<br/>Country: Nigeria<br/></div></div><br/><div class='col-sm-12'><b>Beneficial Ownership Details</b><br/>Form Date: 23-APR-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Alex-Adedipe Adegoriola Adeleke</td><td>NG</td><td>Nigeria</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Duale Yusuf Adeniyi</td><td>NG</td><td>Nigeria</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Ovia Victor Soibi</td><td>NG</td><td>Nigeria</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr><tr><td>Ayinla Orientan Oluwaseye</td><td>NG</td><td>Nigeria</td><td>Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent</td></tr></tbody></table></div></div><br/><div class='col-sm-6'><b>Scores</b><table width='100%'><tbody><tr><td colspan='2' width='50%'>Technical:</td><td width='30%'>99.20</td></tr><tr><td width='10%'></td><td>Consultant Specific Experience:</td><td>10</td></tr><tr><td></td><td>Methodology:</td><td>10</td></tr><tr><td></td><td>Key Personnel:</td><td>39.2</td></tr><tr><td></td><td>Transfer of Knowledge:</td><td>20</td></tr><tr><td></td><td>Participation by Nationals:</td><td>20</td></tr><tr><td colspan='2'>Financial:</td><td>100</td></tr><tr><td colspan='2'>Combined:</td><td>99.44</td></tr><tr><td colspan='2'>Rank:</td><td>1</td></tr></tbody></table></div><div class='col-sm-6'><p></p><b>Final Evaluation Price</b><br/>NGN 142728600.00<br/><p></p><b>Signed Contract Price</b><br/>NGN 125000000.00</div><div class='row col-sm-12'><div class='col-xs-12'><b>Price:</b><br/></div></div><div class='row col-sm-12'><div class='col-xs-4'>Currency:</div><div class='col-xs-4'>Amount:</div></div><div class='row col-sm-12'><div class='col-xs-4'>Nigerian Naira (Nigerian Naira)</div><div class='col-xs-4'>125000000.00</div></div></div><div class='spacing'></div><div class='spacing'></div></div>"},{"id":"OP00439732","notice_type":"Request for Expression of Interest","noticedate":"30-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-04-30T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia, Federal Republic of","project_id":"P501662","project_name":"Somalia productive, resilient, and inclusive growth (SPRING) project","bid_reference_no":"SO-MOF-542815-CS-INDV","bid_description":"Social Safeguard Specialist for NIRA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ministry of Finance - Shanagi District,\nMogadishu, Somalia.","contact_ctry_name":"Somalia, Federal Republic of","contact_email":"procurementspring1@gmail.com","contact_name":"Ahmed  Burale","contact_organization":"Federal Republic of Somalia, Ministry of Finance, Office of the Director General","contact_phone_no":"06138","submission_date":"2026-04-30T00:00:00Z","notice_text":"<p>REQUEST FOR EXPRESSION OF INTEREST (REOI) Country: Federal Government of Somalia (FGS) Name of the Project: Somalia Productive, Resilient and Inclusive Growth Project (SPRING), Assignment Title: Social Safeguards Specialist Project ID: P501662 Individual/Firm: Individual Selection Deadline for submission of EOI: April 30 ,2026 at 4:00pm Ref No. SO-MOF-542815-CS-INDV 1. Background: The National Identification and Registration Authority (NIRA) is a Government Agency in Somalia, first established in 2020, with the aim of creating and maintaining the national identification system. NIRA is, inter alia, responsible for registering citizens and residents and for providing them with secure and verifiable credentials, including a unique identification number and a national identity card. It also serves as a trusted provider of identity verification and authentication services, promoting the use of the foundational identification system. With the establishment of NIRA Somalia, the government is committed to providing a reliable and efficient identification system that will enable individuals to access services and participate in the development of the country. The Federal Government of Somalia is implementing the World Bank-financed Somalia Productive, Resilient and Inclusive Growth Project (SPRING) and intends to use part of the proceeds to hire Social Safeguards Specialist for the National Identification and Registration Authority. (Individual Consultant) Responsibilities: The Social Safeguards Specialist will be responsible for overseeing all aspects of Social Risk Management, Safeguards Instruments, Stakeholder Engagement and Inclusion, Grievance Redress Mechanism (GRM), Capacity Building and Advisory Support, Monitoring and Reporting. The role is critical in supporting NIRA&rsquo;s operations throughout. All other specific tasks detailed in the Terms of Reference (TOR) for the assignment can be found at the following website link: https://nira.gov.so/careers/social-safeguards-specialist 1 2. Skills and qualifications Selection Criteria: The selection shall be based on qualification, experience and skills of the candidate and followed by an interview. The qualifications, experience and competencies include: &bull; A Master&rsquo;s degree in Development Studies ,Social Sciences or a related field, including, Sociology, Community Development, Environmental Studies, Economics, or other relevant disciplines. &bull; At least ten (10) years of professional experience in social development, with demonstrated expertise in social safeguards, stakeholder engagement, and social risk management working on donor-funded projects or with government institutions implementing similar programs. &bull; Strong analytical, advisory, and reporting skills. &bull; Proven experience in developing guidance materials, training programs, and capacity-building initiatives. &bull; Strong coordination and communication skills, with experience engaging government institutions, development partners, and communities. &bull; Experience working in fragile and conflict-affected contexts is highly desirable. &bull; Fluency in English and Somali (written and spoken) is required. 3. Duration: The proposed duration for the assignment is one year (12) calendar months from starts date. 4. The Ministry of Ministry of Finance now invites eligible consulting (&ldquo;Consultants&rdquo;) to indicate their interest in providing the above-mentioned Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services and furnish the Curriculum Vitae (CV). 5. Attention of interested Consultants is drawn to section III, para 3.14, 3.16 &amp; 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services dated in September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. 6. A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations. 7. Interested Consultant may obtain further information (in person or by e-mail) at the address below during office hours from 8.00 a.m. &ndash; 4.00 p.m. Saturday to Thursday except on public holidays. 8. Deadline for submission: Expressions of interest should be delivered in a written form to the address below (in person, or by e-mail) by 30th April 2026 4:00PM. Local Time. Attention; Project Coordinator SCALED-UP Project Ministry of Finance Federal Government of Somalia Shangani District, Mogadishu, Somalia Email Address: bid.scaledup@piu.mof.gov.so Cc: hr@nira.gov.so</p>"},{"id":"OP00438340","notice_type":"Contract Award","noticedate":"13-Apr-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Caribbean","project_id":"P171528","project_name":"Caribbean Digital Transformation Project","bid_reference_no":"SVG-CARDTP-GO-RFP-2","bid_description":"System Integration, Implementation of Portal and User Authentication","procurement_group":"GO","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","submission_date":"2026-04-13T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P171528-Caribbean Digital Transformation Project<br/><b>Loan/Credit/TF Info:</b>IDA-66910<br/><b>Bid/Contract Reference No:</b>SVG-CARDTP-GO-RFP-2<br/><b>Procurement Method:</b>RFP-Request for Proposals<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>System Integration, Implementation of Portal and User Authentication</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/04/02<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>22 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NETCLUES (1023177)</b><br/>Cannon Place, North South Road, Industrial Park, Goerge Town, KY11208<br/>Country: Cayman Islands<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>USD<br/><br/>Evaluated Bid Price<br/>USD 1320000.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>USD 1320000.00</div><br/></div><div class='col-sm-12'><b>Beneficial Ownership Details</b></div><br/><div class='col-sm-12'><b>NETCLUES (1023177)</b><br/>Form Date: 09-APR-26<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Kartik Nikhil Mehta</td><td>CA</td><td>Cayman Islands</td><td>Directly or indirectly holding 25% or more of the shares, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent, Directly or indirectly holding 25 % or more of the Voting Rights</td></tr></tbody></table></div></div><br/></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>AEON SOFTWARE PVT. LTD. (366220)</b><br/>A-103, Everest Grande, Shanti Nagar, MIDC, Andheri(E), Mumbai<br/>Country: India<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Evaluation Scores<br/><br/><br/>Bid Price at Opening<br/>USD<br/><br/>Evaluated Bid Price<br/>USD 2955192.00</div></br></div><br/></div></div>"},{"id":"OP00438316","notice_type":"Contract Award","noticedate":"13-Apr-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Ukraine","project_id":"P180245","project_name":"Health Enhancement And Lifesaving (HEAL) Ukraine Project","bid_reference_no":"HEAL-RFQ-4.1.1.9/1","bid_description":"Ensuring the functioning of the Sectoral Center for Cybersecurity in the Healthcare system","procurement_group":"GO","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","submission_date":"2026-04-13T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P180245-Health Enhancement And Lifesaving (HEAL) Ukraine Project<br/><b>Loan/Credit/TF Info:</b>IBRD-94680<br/><b>Bid/Contract Reference No:</b>HEAL-RFQ-4.1.1.9/1<br/><b>Procurement Method:</b>RFQ-Request for Quotations<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Ensuring the functioning of the Sectoral Center for Cybersecurity in the Healthcare system</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/02/16<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>9 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>IT RISHENNIYA (1046001)</b><br/><br/>Country: Ukraine<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>UAH 49598421.52<br/><br/>Evaluated Bid Price<br/>UAH 49598421.52</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>EUR 1102170.00</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>OPTIDATA (729211)</b><br/>Kyiv<br/>Country: Ukraine<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>UAH<br/><br/>Evaluated Bid Price<br/>UAH<br/><br/>Reason for Rejection<br/>Non-compliance<br/></div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>ACCORD GROUP (1078741)</b><br/><br/>Country: Ukraine<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>UAH<br/><br/>Evaluated Bid Price<br/>UAH<br/><br/>Reason for Rejection<br/>Non-compliance<br/></div></br></div><br/></div></div>"},{"id":"OP00430647","notice_type":"Invitation for Prequalification","noticedate":"09-Apr-2026","notice_lang_name":"French","notice_status":"Published","submission_deadline_date":"2026-05-06T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Western and Central Africa","project_id":"P167798","project_name":"Cameroon-Chad Transport Corridor","bid_reference_no":"CM-MINT-525560-GO-RFP","bid_description":"Conception, développement et mise en place d’un Système d’Informations National de Données sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride à Haute Disponibilité","procurement_group":"GO","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","contact_address":"CAB/ MINT (+237) 222 22 87 29 (+237)222 23 23 65","contact_ctry_name":"Cameroon","contact_email":"claudentone@yahoo.fr","contact_name":"CLAUDE MISSE NTONE","contact_organization":"Ministry of Transport","contact_phone_no":"698209952","contact_web_url":"https://mintransports.net/en/","submission_date":"2026-04-09T00:00:00Z","notice_text":"<p><strong>Avis de selection initiale N&deg;001/ASI/MINT/ PCDN/UGP/2026/</strong></p>\n\n<p><strong>du 07 Avril 2026 relatif &agrave; la conception, le d&eacute;veloppement et la mise en place d&rsquo;un syst&egrave;me d&rsquo;information national de donn&eacute;es sur les accidents de la route (SINDAR) au Cameroun, incluant une infrastructure serveur central cloud hybride &agrave; haute disponibilit&eacute;</strong></p>\n\n<ol>\n\t<li>Le Gouvernement du Cameroun a re&ccedil;u un financement de la Banque mondiale pour le co&ucirc;t du Projet r&eacute;gional pour l&rsquo;am&eacute;lioration de la performance du Corridor rail/route Douala-N&rsquo;djam&eacute;na, et a l&rsquo;intention d&rsquo;appliquer une partie du produit aux paiements en vertu du march&eacute; pour&nbsp; la conception, du d&eacute;veloppement et de la mise en place d&rsquo;un Syst&egrave;me d&rsquo;Informations National de Donn&eacute;es sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride &agrave; Haute Disponibilit&eacute;.</li>\n\t<li>Le Coordonnateur du PCDN a l&rsquo;intention de s&eacute;lectionner initialement les Candidats &nbsp;pour &nbsp;la <strong>conception, le d&eacute;veloppement et la mise en place d&rsquo;un Syst&egrave;me d&rsquo;Informations National de Donn&eacute;es sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride &agrave; Haute Disponibilit&eacute;</strong>, y compris la proposition d&#39;un ensemble harmonis&eacute; d&#39;&eacute;l&eacute;ments de donn&eacute;es (Data Elements), l&rsquo;&eacute;laboration d&rsquo;un dictionnaire de donn&eacute;es d&eacute;taill&eacute;es, la d&eacute;finition des normes de qualit&eacute; des donn&eacute;es, la sp&eacute;cification des indicateurs de performance cl&eacute;s (KPIs) tels que taux de mortalit&eacute;, taux de blessures graves, types d&#39;accidents pr&eacute;dominants, efficacit&eacute; des interventions, l&rsquo;int&eacute;gration et la gestion des Donn&eacute;es, les analyses avanc&eacute;es, le reporting et la diffusion, l&rsquo;acquisition et le param&eacute;trage des logiciels, l&rsquo;int&eacute;gration des syst&egrave;mes, la migration des donn&eacute;es existantes, les tests complets, la formation, la mise en service, l&rsquo;accompagnement et la p&eacute;rennisation du syst&egrave;me.<strong> </strong>On s&rsquo;attend &agrave; ce que la Demande de Propositions soit &eacute;mise en juin 2026.</li>\n\t<li>La S&eacute;lection Initiale sera effectu&eacute;e selon les proc&eacute;dures sp&eacute;cifi&eacute;es dans le R&egrave;glement de Passation des March&eacute;s &nbsp;de la Banque mondiale pour les Emprunteurs de FPI, septi&egrave;me &eacute;dition, septembre 2025 &laquo; R&egrave;glement de Passation des March&eacute;s &raquo;), et est ouverte &agrave; tous les Candidats &eacute;ligibles tels que d&eacute;finis dans le R&egrave;glement de Passation des march&eacute;s.</li>\n\t<li>Les Candidats &eacute;ligibles int&eacute;ress&eacute;s peuvent obtenir de plus amples informations aupr&egrave;s de l&rsquo;Unit&eacute; de gestion du Projet r&eacute;gional pour l&rsquo;am&eacute;lioration de la performance du Corridor rail/route Douala-N&rsquo;djam&eacute;na &agrave; l&rsquo;adresse ci-dessous pendant les heures de bureau de 9 heures &agrave; 16 heures.</li>\n</ol>\n\n<p>Un ensemble complet du dossier de <strong>S&eacute;lection Initiale</strong> <strong>en fran&ccedil;ais</strong> peut &ecirc;tre obtenu par les Candidats int&eacute;ress&eacute;s &agrave; l&rsquo;adresse ci-dessous sur pr&eacute;sentation de l&rsquo;original de la quittance de versement de la somme non remboursable de trois cents (300) mille Francs CFA repr&eacute;sentant les frais d&rsquo;acquisition du dossier sur le compte n&deg;335 988 ouvert aupr&egrave;s des 12 agences BICEC ci-apr&egrave;s au nom de &laquo;&nbsp;Compte Sp&eacute;cial CAS ARMP&nbsp;&raquo;<em>.</em> Le dossier sera envoy&eacute; par courrier aux entreprises dont le si&egrave;ge social est bas&eacute; hors du Cameroun.</p>\n\n<p>5.Les candidatures de S&eacute;lection Initiale doivent &ecirc;tre soumises en quatre (04) exemplaires dont un (01) original et trois (03) copies marqu&eacute;es comme tels, et accompagn&eacute;es de la version scann&eacute;e de l&rsquo;original de la candidature d&eacute;pos&eacute;e (sign&eacute;e et cachet&eacute;e) sur cl&eacute; USB, dans des enveloppes clairement marqu&eacute;es &agrave; l&rsquo;adresse ci-dessous au plus tard &agrave; <strong>14 heures, heure locale</strong><em> </em>le <strong>06 mai 2026</strong>.</p>\n\n<p>Les candidatures peuvent &eacute;galement &ecirc;tre soumises par voie &eacute;lectronique sur le site COLEPS &agrave; l&rsquo;adresse www.marchespublics.cm. Une copie de sauvegarde de l&rsquo;offre enregistr&eacute;e sur cl&eacute; USB devra &ecirc;tre transmise sous plis scell&eacute; avec l&rsquo;indication claire et lisible &laquo;&nbsp;COPIE DE SAUVEGARDE&nbsp;&raquo; dans les d&eacute;lais impartis.</p>\n\n<p><strong>Les demandes tardives seront rejet&eacute;es.</strong></p>\n\n<p>Les enveloppes ferm&eacute;es devront comprendre la mention suivante&nbsp;:</p>\n\n<p><strong><em>&laquo;&nbsp;AVIS DE SELECTION INITIALE N&deg;001/ASI/MINT/PCDN/UGP/2026 DU 07 AVRIL 2026 RELATIF&Agrave; LA CONCEPTION, LE D&Eacute;VELOPPEMENT ET LA MISE EN PLACE D&rsquo;UN SYST&Egrave;ME D&rsquo;INFORMATION NATIONAL DE DONN&Eacute;ES SUR LES ACCIDENTS DE LA ROUTE (SINDAR) AU CAMEROUN, INCLUANT UNE INFRASTRUCTURE SERVEUR CENTRAL CLOUD HYBRIDE &Agrave; HAUTE DISPONIBILIT&Eacute; &raquo;</em></strong></p>\n\n<p><strong><em>&laquo;&nbsp;A N&rsquo;OUVRIR QU&rsquo;EN SEANCE DE DEPOUILLEMENT&nbsp;&raquo;.</em></strong></p>\n\n<p>L&rsquo;adresse &agrave; laquelle il est fait r&eacute;f&eacute;rence ci-dessus est&nbsp;:</p>\n\n<p><strong>Unit&eacute; de Gestion du PCDN</strong></p>\n\n<p><strong>Bastos, derri&egrave;re l&rsquo;H&ocirc;tel le Diplomate, Rue 1.904</strong></p>\n\n<p><strong>Email&nbsp;: </strong><strong>claudentone@yahoo.fr</strong><strong> avec copie &agrave; </strong><strong>mnnjeck@gmail.com</strong><strong> </strong><strong>et</strong><strong> </strong><strong>cteignegou@yahoo.fr</strong>.</p>"},{"id":"OP00437275","notice_type":"Request for Expression of Interest","noticedate":"08-Apr-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-04-28T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Lebanon","project_id":"P181954","project_name":"GFPP for Lebanon Digital Acceleration Project","bid_reference_no":"LB-OMSAR-537752-CS-CQS","bid_description":"e-services, Business Process Reengineering Foundational Work as part of Re-inventing Government (6 priority services)","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"STARCO Building, Block A, 5th Floor, Omar Daouk Street, Mina Al Hosn City: Beirut, Lebanon","contact_ctry_name":"Lebanon","contact_email":"mhammoud@omsar.gov.lb","contact_name":"Mirvat Hammoud","contact_organization":"Office of the Minister of State for Administrative Reform","contact_phone_no":"+961 (1) 371 505","submission_date":"2026-04-08T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p>\n\n<p><strong>CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p>\n\n<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government<em> </em></strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Name of Project</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:329px\">\n\t\t\t<p><strong>GFPP for Lebanon Digital Acceleration Project (LDAP)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Loan No/Credit No/ Grand Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>TF0C8895</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Assignment Title</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Procurement Plan Ref Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>LB-OMSAR-537752-CS-CQS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Country of Delivery </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>Lebanon</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>The <strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong> has received financing from the World Bank toward the cost of the <strong>Preparation Grant for the Lebanon Digital Acceleration Project (LDAP) </strong>and intends to apply part of the proceeds for the following consulting services.</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include the <strong>end-to-end improvement and digital transformation of six (6) priority public services</strong> within selected sectors/clusters. The assignment utilizes an <strong>agile methodology</strong> (MVP, alpha, and beta stages) to diagnose &quot;As-Is&quot; processes, redesign &quot;To-Be&quot; workflows, classify data according to the National Data Classification Policy, and integrate electronic signature use cases. The Consultant will configure these services on Lebanon&rsquo;s <strong>National Portal</strong>, a low-code automation platform, and provide capacity building for civil servants. The estimated implementation period is <strong>five (5) months</strong> from the contract commencement date.</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment is attached to this REOI<em>.</em></p>\n\n<p>OMSAR now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>The attention of interested Consultants is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers dated September 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>The best qualified firm to carry out the services will be selected in accordance with the Consultant&rsquo;s Qualifications Based Selection (CQS) method set out in the Regulations and based on the following criteria:</p>\n\n<p>Mandatory Minimum Requirements:</p>\n\n<ul>\n\t<li><strong>Core Business and Longevity:</strong> The firm must be a legally registered entity with at least <strong>ten (10) years</strong> of demonstrated experience in Management Consulting, Digital Transformation, and Information Technology.</li>\n\t<li><strong>Similar Contract Experience:</strong> Proven track record with at least <strong>two (2) similar contracts</strong> successfully completed within the last <strong>seven (7) years</strong>. A &quot;similar contract&quot; must involve:\n\t<ul>\n\t\t<li><strong>Scope:</strong> End-to-end digital transformation, including business process re-engineering (BPR) and deployment of e-services.</li>\n\t\t<li><strong>Context:</strong> Projects implemented specifically for <strong>Public Sector clients</strong> (Ministries or Government Agencies).</li>\n\t\t<li><strong>Scale:</strong> Redesign and digitization of multiple services simultaneously or sector-wide reforms.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>Desirable Requirements (Technical and Managerial Capability):</p>\n\n<ul>\n\t<li><strong>Organizational Capacity:</strong> Demonstrated ability to manage complex, multi-disciplinary projects (strategy, operations, and technology) simultaneously.</li>\n\t<li><strong>Specific Technical Expertise:</strong> In-house expertise in User-Centric Design (UX/UI), secure software development, and the application of <strong>data governance and e-signature mechanisms</strong>.</li>\n\t<li><strong>Regional Experience:</strong> Experience in the <strong>MENA region</strong> or Lebanon is highly desirable.</li>\n\t<li><strong>Change Management:</strong> Proven experience in delivering capacity building and training programs for government staff.</li>\n</ul>\n\n<p>(Note: The qualifications and experience of Key Experts shall not be evaluated at this shortlisting stage).</p>\n\n<p>To ensure a complete submission, the Expression of Interest (EOI) <strong>must include the following minimum documentation:</strong></p>\n\n<ul>\n\t<li><strong>Documented Evidence of Experience:</strong> Detailed references for similar projects, accompanied by <strong>Contract Award Notices and/or Completion Certificates</strong>.</li>\n\t<li><strong>Bilingual Capability Statement:</strong> Written confirmation of the ability to deliver all reports and portal configurations in both English and Arabic.</li>\n\t<li><strong>Conflict of Interest Disclosure:</strong> A signed statement confirming no conflict of interest as per the Regulations.</li>\n\t<li><strong>Joint Venture (JV) Requirements:</strong> If applying as a JV, a letter of intent or existing agreement must be provided, identifying the <strong>Lead Firm</strong> and specifying that all partners shall be <strong>jointly and severally liable</strong>.</li>\n</ul>\n\n<p>Further information can be obtained at the address below during office hours (09:00 AM to 04:00 PM Beirut Time).</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>COB 28 April, 2026. </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong></p>\n\n<p>Technical Unit &ndash; Preparation Grant for Lebanon Digital Acceleration Project</p>\n\n<p><strong>Attn</strong>: Ms. Mirvat Hammoud &ndash; Procurement Specialist</p>\n\n<p><strong>Address</strong>: STARCO Building, Bloc A, 5th Floor, Room 505a</p>\n\n<p>Omar Daouk Street, Mina El Hosn Sector</p>\n\n<p>Beirut, Lebanon</p>\n\n<p><strong>Tel</strong>: +961 (1) 371 505; ext. 160</p>\n\n<p><strong>E-mail</strong>: <em>mhammoud@omsar.gov.lb</em></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Attachment: Terms of Reference (TOR)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p><strong>PREPARATION GRANT FOR LEBANON DIGITAL ACCELERATION PROJECT (P181954)</strong></p>\n\n<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government </strong></p>\n\n<ol>\n\t<li>Background</li>\n</ol>\n\n<p>Lebanon&rsquo;s public administration has remained largely unchanged for decades, operating with outdated structures, fragmented mandates, widespread vacancies, and weak digital and human capital systems. Combined with paper-based processes, siloed information systems, and manual approval workflows, these constraints have resulted in inefficient service delivery, duplication of roles, limited transparency, and a growing gap between government capabilities and citizen expectations.</p>\n\n<p>&nbsp;</p>\n\n<p>In response, the Government of Lebanon, with support from the World Bank, as part of the Lebanon Digital Acceleration Project (LDAP), is undertaking a strategic investment aimed at modernizing public administration and strengthening the core digital enablers required for trusted digital service delivery. To support project readiness, the World Bank&rsquo;s Grant Facility for Project Preparation (GFPP) has been extended to the Office of the Minister of State for Administrative Reform (OMSAR). The GFPP grant is implemented by a Technical Unit (TU) housed within OMSAR.</p>\n\n<p>&nbsp;</p>\n\n<p>In parallel, OMSAR, under direct government sponsorship, has launched &ldquo;Reinventing Government 2030&rdquo; a whole of government reform effort that aims to restructure the public sector into a coherent, citizen centric, mission driven public administration.</p>\n\n<p>&nbsp;</p>\n\n<p>The reform is structured in phases progressively building toward implementation. It began with the Stakeholders&rsquo; Aspirations phase, which defined a forward-looking vision for Lebanon&rsquo;s public administration and establishing guiding design principles. This phase has been completed. It is followed by the development of a <em>Blueprint for Public Sector Reform</em>, encompassing baseline assessments and benchmarking of current institutions and services, and the piloting of the proposed model across selected ministries. The final phase focus is on implementation, including the re-engineering and digitization of priority public services, supported by the necessary legal and regulatory changes.</p>\n\n<p>&nbsp;</p>\n\n<p>To support service transformation under this agenda, OMSAR is advancing key digital foundations as part of the LDAP. These efforts will be undertaken by OMSAR and OMSTAI within their mandates and technical expertise and in coordination with relevant stakeholders, ensuring consistency with national digital transformation, national digital trust, data governance, and interoperability frameworks. This includes the development of a National Data Classification Policy, as well as targeted support to the electronic signature framework under the existing legal system. In particular, OMSAR will work closely with the Lebanese Accreditation Council (COLIBAC) to support the definition of practical requirements and baseline criteria for electronic signature accreditation and use.</p>\n\n<p>&nbsp;</p>\n\n<p>The activities are intended to be implemented in parallel and informed by practical application in real service contexts. Within this framework, e-services constitute the operational layer through which institutional reform and key digital enablers are translated into tangible improvements in service delivery.</p>\n\n<p>&nbsp;</p>\n\n<p>As part of the preparatory work, an initial service prioritization exercise across several ministries has been carried out to identify potential candidate services for the assignment. Indicative examples of such services, and which are non-exhaustive and non-binding, and are subject to further validation, include digital diploma attestation, trader registration and clearance services, tourism licensing digitization, payment of fees for investment and right-of-way services, and selected municipal and sectoral permits.</p>\n\n<p>&nbsp;</p>\n\n<p>The redesign and digitization of selected priority public services will enable the practical piloting of data classification and the integration of one or more electronic signature use cases within end-to-end government workflows.</p>\n\n<p>&nbsp;</p>\n\n<p>This initiative will create a controlled environment to apply data classification rules and electronic signature mechanisms in practice, generate actionable lessons, and support future scale-up under the full LDAP through a phased and realistic expansion of digital public services in Lebanon.</p>\n\n<ol>\n\t<li>Assignment and Objective</li>\n</ol>\n\n<p>The objective of this assignment is to establish an evidence-based, end-to-end improvement of priority public services within selected sector(s)/cluster(s). This will be achieved through an agile approach, utilizing MVP (Minimum Viable Product), alpha, and beta stages. This requires various iterations in diagnosing current service processes and organizational arrangements, redesigning workflows to remove pain points and operational bottlenecks, digitizing service-delivery practices, applying data classification requirements and operationalizing one or more electronic signature use cases within real government workflows to ensure consistent execution.</p>\n\n<p>&nbsp;</p>\n\n<p>The assignment will demonstrate a full transformation cycle, that will inform future scaling, covering process re-engineering, technology enablement and civil servants&rsquo; operational readiness, and will generate validated lessons to inform future scaling across other services and sectors. Ultimately, the project aims to provide concrete execution that will strengthen public trust and citizen experience, streamline government operations, enhance transparency, and promote more efficient and accountable use of public resources.</p>\n\n<p>This will be achieved by:</p>\n\n<ol>\n\t<li><strong>Diagnosing and mapping</strong> current service processes, including assessing regulatory, policy and organizational arrangements across the involved entities, reviewing existing systems and platforms, and identifying main pain points for the citizen and the civil servants;</li>\n\t<li><strong>Collecting and analyzing</strong> service-related data and applying the National Data Classification Policy to classify data used within the selected services;</li>\n\t<li><strong>Redesigning</strong> workflows and ministry service points to eliminate pain points, inefficiencies, and bottlenecks identified during the diagnostic phase; and</li>\n\t<li><strong>Digitizing and enabling</strong> service-delivery processes on the National Portal to ensure consistent, scalable, and user-centric execution, and integrating one or more electronic signature use cases, in line with the existing legal, institutional, and policy frameworks.</li>\n</ol>\n\n<p><strong>Not</strong><strong>e:</strong> Integration shall rely on existing systems and available APIs. The Consultant will be responsible for integrating services with the National Portal using existing APIs and interfaces where available. The development of new APIs is not required under this assignment.</p>\n\n<p>The National Portal is a low-code platform that supports workflow automation. It allows the creation of reusable libraries and modular service components that can be configured and reconfigured across different services, supporting integration and the transition from paper-based procedures to structured and traceable digital processes.</p>\n\n<ol>\n\t<li>Scope of Work</li>\n</ol>\n\n<p>The Consultant will implement the redesign and digitally transform 6 priority services. These services will be selected through a collaborative process where the Consultant proposes a list of 10-12 proposed services, which are then shortlisted and approved to arrive at the final 6. As part of the assignment, data associated with the selected services will be collected, analyzed, and classified in line with the proposed National Data Classification Policy, and one or more electronic signature use cases will be operationalized within selected service workflows, in accordance with the applicable legal and institutional framework. For each service, the scope of work includes:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Confirming the service scope, stakeholders, boundaries and interministerial dependencies to clarify objectives and ensure alignment with cross government digital enablers;</li>\n\t<li>Conducting an as is diagnostic to map current service workflows, roles, handoffs, pain points and bottlenecks (from citizen and civil servant perspectives) and to analyze all relevant or potential regulatory, policy and cross government dependencies such as e-signature application, data governance and classification rules, and future digital identity/trust requirements;</li>\n\t<li>Designing a streamlined, digitization ready &ldquo;to be&rdquo; service workflow that removes bottlenecks, simplifies approvals, and reasonably aligns with the existing legal and trust framework;</li>\n\t<li>Proposing functional and non‑functional elements (including security, privacy, interoperability and performance), acceptance criteria and operating roles for the redesigned service, in line with existing applicable frameworks;</li>\n\t<li>Developing, configuring, testing, validating, and operationally rolling out the digitized services in accordance with the approved &ldquo;to-be&rdquo; design, including the integration of cross-government digital enablers (e.g., data classification controls, electronic signature use cases, interoperability components, and trust services; and</li>\n\t<li>Civil servants enablement and capacity building for service operations, ensuring that personnel across participating entities are equipped to operate, manage, and sustain the transformed services.</li>\n</ol>\n\n<p>The complexity layer defined in the table below assesses the level of effort, coordination, legal change, and technical integration required to redesign and digitize the initial pool of 10&ndash;12 proposed services, from which the final list of six services will be selected.</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:104px\">\n\t\t\t<p><strong>Complexity layer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:398px\">\n\t\t\t<p><strong>Definition (how to interpret complexity)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf\">\n\t\t\t<p><strong>Minimum distribution across 10-12 services</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:120px; width:104px\">\n\t\t\t<p><strong>High</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:120px; width:398px\">\n\t\t\t<p>Requires significant cross-entity coordination and/or end-to-end workflow redesign; multiple approval points; complex integrations (e.g., interoperability/API dependencies), high institutional and legislative change load, and/or heightened data/sensitivity considerations.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:120px\">\n\t\t\t<p><strong>At most 2</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:103px; width:104px\">\n\t\t\t<p><strong>Medium</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:103px; width:398px\">\n\t\t\t<p>Moderate redesign and coordination requirements; limited number of entities; some integration needs; manageable procedural/legal constraints; moderate change load for staff and operations.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:103px\">\n\t\t\t<p><strong>At least 4</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:85px; width:104px\">\n\t\t\t<p><strong>Low</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:85px; width:398px\">\n\t\t\t<p>Contained workflow and limited stakeholders; minimal integration; simpler procedural/legal footprint; low change load; can be digitized with relatively standard patterns.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:85px\">\n\t\t\t<p><strong>At least 4</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The prioritization and selection of services will be guided by a set of criteria aligned with the LDAP design and objectives. These include: (i) expected number of users or beneficiaries and the potential to improve citizen experience at scale; (ii) magnitude of the anticipated developmental impact, including improvements in transparency, efficiency, and service delivery outcomes; (iii) potential to benefit vulnerable groups, including low-income, conflict-affected, and climate-vulnerable populations, as well as women and girls; (iv) readiness for digitization, taking into account existing technological, institutional, and legal conditions; (v) sustainability and the potential for scaling beyond the pilot phase; (vi) feasibility of achieving end-to-end digitalization; and (vii) the ability to leverage existing / future national digital foundations and enablers, such as digital identity, data sharing frameworks, and data governance systems.</p>\n\n<ol>\n\t<li>Key Activities</li>\n</ol>\n\n<p>This assignment will operationalize the transformation agenda by translating previously developed frameworks into practical, service-level improvements. It will provide the evidence, design solutions, and implementation of insights required to validate the Target Operating Model and demonstrate how re-engineered, digitally enabled services supported by data classification and electronic signature use cases can be delivered in practice and scaled across government.</p>\n\n<p>Building on the frameworks, interaction models, and sector analyses developed under earlier deliverables, the selected firm will lead the end-to-end implementation of priority services within the selected sector(s)/cluster(s). The assignment follows a structured, outcome-oriented approach covering service assessment, workflow redesign, data classification, digitization, and the operationalization of electronic signature use cases, as detailed below.</p>\n\n<p><strong>Deliverable D1:</strong> <strong><em>Inception Report and Agile Roadmap.</em></strong></p>\n\n<p>Prepare and submit an inception report as a deliverable, that shall include:</p>\n\n<ol>\n\t<li>A validated understanding of the assignment context, objectives, scope including confirmation of stakeholders, boundaries, and dependencies;</li>\n\t<li>A detailed workplan and timeline aligned with the agreed deliverables, including validation milestones and decision gates;</li>\n\t<li>A methodology and engagement approach, including developing data / information gathering templates from the various service providers and ministries, and describing data collection, analysis techniques, and stakeholder engagement;</li>\n\t<li>A description of the agile approach (delivery stages - MVP, alpha and beta, sprint structure, sequencing approach and governance arrangements for iterative delivery and approvals); and</li>\n\t<li>An initial risk assessment and mitigation strategy.</li>\n</ol>\n\n<p><strong>Deliverable D2:</strong> <strong><em>Initial Data Collection and Preliminary Consultations </em></strong><em>to Inform the Subsequent Phases, Including the Shortlisting of Services.</em></p>\n\n<p>Present a summary on the initial data collection exercise and consultations:</p>\n\n<ol>\n\t<li>Minimum data collection exercise leveraging previous work conducted and related to the service data collection efforts, catalogs, and existing documentation</li>\n\t<li>Rapid consultations with relevant service owners and stakeholders to validate service scope, relevance, and key dependencies; and</li>\n\t<li>Confirm the initial list of 10-12 candidate services out of which the final set of services to be digitalized will be selected.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Deliverables D3-D5(three sprint waves):</strong> <em>Agile End-to-End </em>Service <em>Transformation, Deployment, Monitoring and Capacity Building.</em></p>\n\n<p>The Consultant shall implement the assignment using a structured agile, sprint-based approach, progressing services iteratively from discovery to working Minimum Viable Product (MVP) delivery and validation. Services shall be advanced in<strong> pairs (two services per sprint wave) </strong>and be configured and deployed through the National Portal. Each sprint wave shall follow a defined cycle of discovery, co-design, build, test, user validation, and retrospective review.</p>\n\n<p>Progression to subsequent sprint waves shall be contingent upon formal validation of the MVPs of the preceding wave and completion of sprint retrospectives capturing lessons learned, reusable components, and required adjustments.</p>\n\n<p>&nbsp;As stated above, the digitalization of services under will be implemented through the National low-code platform that enables workflow automation and service configuration with minimal need for custom software development. Under this approach, the Consultant will design and configure service workflows, data structures, business rules, and integration points within the platform, with minimal development of custom code. These configurations are executed by the platform to deliver fully functional digital services. The Consultant will therefore focus on preparing structured workflows, functional specifications, and integration logic that can be deployed on the platform, ensuring that services are delivered in a standardized, secure, and user-accessible format. The platform supports the use of reusable components, libraries, and modular building blocks, which can be configured and adapted across multiple services to improve efficiency and scalability.</p>\n\n<p>The Consultant will hence be able to leverage the platform&rsquo;s flexibilities, continuously improving across waves through by reusing configurable libraries, workflow blocks, and integration components developed on the National Portal.</p>\n\n<p>Activities under this deliverable shall include:</p>\n\n<ol>\n\t<li>Progressive selection and preliminary assessment of candidate services from an initial pool of 10-12 services, including evaluation of impact, complexity, feasibility (legal and technical), and institutional readiness;</li>\n\t<li>Validation meetings with the relevant ministries/entities for each candidate service to confirm service scope and boundaries, responsible and participating entities (service owner and process owner), decision/approval authority, inter-ministerial dependencies, current workflow realities, implementation readiness, and assessment existing digital systems;</li>\n\t<li>The Consultant must obtain formal written endorsement from the Technical Committee (TC) in coordination with the concerned ministries prior to initiating detailed mapping and redesign activities. The endorsement shall confirm approval of the agile implementation approach, agreement on the selected service(s), and the nomination of a dedicated focal point to ensure ongoing coordination and decision-making;</li>\n\t<li>Service-level baseline (&ldquo;As-Is&rdquo;) mapping for each service entering the sprint cycle, including current workflows, roles, hand-offs, approvals, bottlenecks, data flows, governance procedures, and legal, procedural, and technical constraints, together with documentation of baseline requirements and operational readiness prerequisites to inform redesign and digitization. The Consultant shall submit a detailed Business Requirements Document (BRD) reflecting the findings from the mapping and stakeholder engagement;</li>\n\t<li>Iterative redesign of current services to make them streamlined, digitization-ready &ldquo;To-Be&rdquo; workflows. Classify the data elements related to the services in accordance with the National Data Classification Framework and proposed Policy. Where the redesigned service includes approvals, signatures, and authentication steps, assess and implement the appropriate electronic signature use cases in alignment with the existing legal and institutional framework;</li>\n\t<li>Definition of functional and non-functional requirements for the redesigned and digitized service (not the legacy workflow), including security, privacy, interoperability, performance, user stories, acceptance criteria, operating roles, and system integration requirements, ensuring that redesigned workflows are compatible with and can be deployed through the National Portal. The consultant must submit a functional specification document (FSD) on the redesigned service that will go into the low-code platform;</li>\n\t<li>Identification of enabling legislative, regulatory, or policy adjustments required to operationalize the redesigned digital service and ensure alignment with cross-government digital enablers;</li>\n\t<li>Iterative configuration, development, testing, deployment, and stakeholder validation (including demos and UAT where applicable), resulting in working MVP/alpha versions for the services that successfully progress through the sprint cycle;</li>\n\t<li>Development and progressive enhancement of a service performance monitoring dashboard, including:</li>\n</ol>\n\n<ul>\n\t<li>Definition of service-level KPIs.</li>\n\t<li>Configuration of the selected services dashboard using the existing platform toolkit, to be used by authorized users based on agreed access rights, during their respective sprint wave.</li>\n\t<li>Incremental onboarding of additional services to the dashboard in subsequent sprints.</li>\n</ul>\n\n<ol>\n\t<li>Delivery of hands-on training and capacity-building sessions as part of each sprint wave, covering:</li>\n</ol>\n\n<ul>\n\t<li>Operation of the digitized service.</li>\n\t<li>Use of the monitoring dashboard.</li>\n\t<li>Governance and oversight responsibilities.</li>\n</ul>\n\n<p>Throughout D3&ndash;D5, the Consultant shall apply core agile principles, including time-boxed sprints, continuous stakeholder engagement, rapid feedback loops, and formal sprint retrospectives to ensure adaptive delivery, risk reduction, and scalable reuse across services. To initiate the release of payments associated with these deliverables, the Consultant must provide documented evidence of satisfactory delivery. This shall include a Certificate of Delivery of Services issued by the Consultant, and submitted to the Grant Coordinator, and subsequently validated and approved by the TC.</p>\n\n<p><strong>Deliverable D6:</strong> <em>Lessons Learned and Scale-Up Recommendations (Final Report).</em></p>\n\n<p>Capture and document lessons learned from the implementation and recommendations to inform the scale-up of service redesign and digitization to additional clusters/sectors. This deliverable will include:</p>\n\n<ol>\n\t<li>Analysis of what worked well and what challenges emerged across service redesign, data classification, and e-signature implementation;</li>\n\t<li>Identification of enablers and constraints related to institutional arrangements, inter-entity coordination, and operational readiness;</li>\n\t<li>Recommendations for improving processes, governance, and technical approaches in future phases;</li>\n\t<li>Guidance on future implementation sequencing, capacity building and policy reforms required to support sustainable digital service delivery; and</li>\n\t<li>Identification of potential risks and mitigation strategies for scaling and future implementation.</li>\n</ol>\n\n<ol>\n\t<li>Project Oversight and Management Structure</li>\n</ol>\n\n<p>A Technical Committee (TC) will be established to provide strategic direction, oversight, and effective management of this engagement. Chaired by the Grant Coordinator and composed of members from OMSAR, OMSTAI, and the involved ministries as applicable, the TC &nbsp;&nbsp;&nbsp;serve as the primary governing body responsible for reviewing the firm&rsquo;s progress and ensuring alignment with beneficiary requirements and national digital transformation goals.</p>\n\n<p>For the purpose of this assignment, the TC is the sole authority empowered to formally accept and approve project deliverables. Approval of each milestone deliverable by TC is a mandatory prerequisite for the release of corresponding payments. The Consulting firm shall provide regular updates and shall submit required Deliverables and reports through the Grant Coordinator to the TC, in addition to official invoice for payment upon the TC formal written acceptance of each deliverable.</p>\n\n<ol>\n\t<li>Deliverables Table</li>\n</ol>\n\n<p>The assignment will be completed over a total period of 5 months from the contract commencement date. The contract commencement date is defined as the date of formal written notification issued by OMSAR to the Consultant to start the work, following the successful completion of the Project Kickoff meeting.</p>\n\n<p>&nbsp;</p>\n\n<p>The consultant must submit all deliverables in English and in Arabic in a format to be agreed upon with TC. The provisional timetable is as follows:</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:624px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:43px; width:138px\">\n\t\t\t<p><strong>Deliverables</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:168px\">\n\t\t\t<p><strong>Description &amp; Key Components</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:102px\">\n\t\t\t<p><strong>Timeline (Cumulative)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:83px\">\n\t\t\t<p><strong>Approvals Required</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:133px\">\n\t\t\t<p><strong>Payment Terms (% of Contract Total Value)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:97px; width:138px\">\n\t\t\t<p><strong>D1</strong> <em>Inception Report and Agile Roadmap</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:168px\">\n\t\t\t<p>Validated scope for services, detailed workplan, and agile sprint structure</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:102px\">\n\t\t\t<p>Week 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:133px\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:97px; width:138px\">\n\t\t\t<p><strong>D2</strong> <em>Summary Report on the initial data collection exercise and consultations</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:168px\">\n\t\t\t<p>Initial data collection exercise, consultations, and confirmation of the initial list of 10-12 candidate services.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:102px\">\n\t\t\t<p>Week 4</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:133px\">\n\t\t\t<p><strong>15%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:77px; width:138px\">\n\t\t\t<p><strong>D3</strong> <em>First sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile</em><em> Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:102px\">\n\t\t\t<p>Week 9</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:41px; width:138px\">\n\t\t\t<p><strong>D4</strong> <em>Second sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:102px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Week 14</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:82px; width:138px\">\n\t\t\t<p><strong>D5</strong> <em>Third sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:102px\">\n\t\t\t<p>Week 19</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:75px; width:138px\">\n\t\t\t<p><strong>D6</strong> <em>Final Report &amp; Lessons Learned and Scale-Up Recommendations </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:168px\">\n\t\t\t<p>Analysis of results, lessons learned, and future scale-up recommendations</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:102px\">\n\t\t\t<p>Week 21</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:133px\">\n\t\t\t<p><strong>15%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li><strong>&nbsp;</strong>Payment Terms and Administrative Requirements</li>\n</ol>\n\n<p><strong>7.1 General Payment Conditions</strong></p>\n\n<ul>\n\t<li><strong>Total Contract Value</strong>: Payments shall be made in installments according to the percentages defined in <strong>Section 6: Deliverables Table</strong>.</li>\n\t<li><strong>Currency and Format</strong>: All invoices must be submitted in the currency specified in the contract and must be accompanied by the relevant bilingual (English/Arabic) deliverable.</li>\n\t<li><strong>Ownership</strong>: Final release of payment for any deliverable is contingent upon the transfer of all intellectual property, including, without limitation, all source-code, data, documents, systems information, architectures, security controls, processes, policies, designs, specifications, source materials, and other information, whether in written, oral, visual, electronic, or any other form, to the Government of Lebanon.</li>\n</ul>\n\n<p><strong>7.2 The TC Approval Gate</strong></p>\n\n<p>The Technical Committee (TC) serves as the sole authority for the acceptance of services. The following administrative process applies to every milestone:</p>\n\n<ul>\n\t<li><strong>Submission</strong>: The Consultant shall submit the deliverable and a concise summary report to the TC Chairperson.</li>\n\t<li><strong>Review Period</strong>: The TC will review the submission for technical accuracy and alignment with the National Data Classification Policy and e-signature framework.</li>\n\t<li><strong>Validation Requirement</strong>: For all deliverables, payment cannot be processed without written validation and sign-off from the TC. In addition to the summary report, the Consultant must submit a Certificate of Delivery of Services.</li>\n\t<li><strong>Formal Acceptance</strong>: The signature of the Grant Coordinator, accepting deliverables and approving the Certificate of Delivery of Services, is a mandatory prerequisite for the release of payment.</li>\n</ul>\n\n<p><strong>7.3 Invoicing Requirements</strong></p>\n\n<p>To initiate a payment, the Consultant must submit to the Grant Coordinator an administrative package containing:</p>\n\n<ol>\n\t<li><strong>Official Invoice</strong>: Referencing the contract number and specific deliverable code (D1&ndash;D6).</li>\n\t<li><strong>Certificate of Delivery of Services: </strong>A formal certificate signed by the Consultant, accompanied by the Deliverable itself and a Concise Summary Report documenting the completion of specific contractual milestones.</li>\n\t<li><strong>Progress Evidence</strong>: For technical stages, evidence of configuration/deployment on the National Portal must be demonstrated.</li>\n</ol>\n\n<p><strong>Attendance Sheets</strong>: Signed logs of training participants must be attached as proof of capacity building.</p>\n\n<p><strong>7.4 Delays and Escalations</strong></p>\n\n<ul>\n\t<li>If a beneficiary entity delays the functional validation of a service (D3) beyond <strong>5 working days</strong>, the Consultant must immediately escalate the matter to the TC for intervention and final decision and to prevent payment bottlenecks.</li>\n</ul>\n\n<p>Payments will be processed within the timeframe specified in the contract conditions following the formal receipt of a &quot;complete&quot; invoice package.</p>\n\n<ol>\n\t<li>Duration of the assignment and estimated key staff-months input</li>\n</ol>\n\n<p>The total duration of the assignment is 5 months from the date of contract signature.</p>\n\n<p>The distribution of Level of Effort for all proposed Key Experts should be detailed in the bidder&rsquo;s technical and financial proposals.</p>\n\n<ol>\n\t<li>Firm Qualifications\n\t<ol>\n\t\t<li><strong>General Corporate Experience</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<ul>\n\t<li>The Firm (or Lead Firm in case of a Joint Venture) must be a legally registered entity with at least ten (10) years of demonstrated experience in the fields of Management Consulting, Digital Transformation, and Information Technology.</li>\n\t<li>The Firm must demonstrate a stable financial standing and the organizational capacity to manage complex, multi-disciplinary projects (strategy, operations, and technology) simultaneously.\n\t<ol>\n\t\t<li>&nbsp;<strong>Specific Project Experience</strong></li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The Firm must demonstrate a proven track record by submitting reference details for at least two (2) similar contracts successfully completed within the last seven (7) years. A &quot;similar contract&quot; is defined as follows:</p>\n\n<ul>\n\t<li>Scope: End-to-end digital transformation of public and private services (at least 2 public services), including business process re-engineering, service simplification, and the actual digitization/deployment of e-services.</li>\n\t<li>Context: Projects implemented specifically for Public Sector clients (Ministries, Government Agencies, or Public Institutions). Experience in the private sector alone should not be considered sufficient given the specific regulatory and bureaucratic complexities of the public sector.</li>\n\t<li>Scale: Projects involving the redesign and digitization of multiple services simultaneously or the implementation of sector-wide digital reforms.\n\t<ol>\n\t\t<li><strong>Technical Capabilities</strong></li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The Firm must demonstrate in its profile that it possesses in-house expertise or established partnerships in:</p>\n\n<ul>\n\t<li>User-Centric Design: Methodologies for service design (e.g., Human-Centered Design, UX/UI).</li>\n\t<li>End‑to‑end digital transformation or BPR of public services, including business process re‑engineering and service simplification.</li>\n\t<li>Software Development: Capabilities in developing secure, interoperable web-based applications and dashboards.</li>\n\t<li>Data and Trust Enablers: Experience applying data governance, data classification, data protection, and/or electronic approval or signature mechanisms within digital public services or government workflows.</li>\n\t<li>Change Management: Experience in delivering capacity building and training programs for government staff.</li>\n</ul>\n\n<ol>\n\t<li>Expected Key Experts</li>\n</ol>\n\n<p>The consultant&#39;s team shall be composed of qualified experts with proven experience. The bidder must propose, at a minimum, the following Key Expert positions:</p>\n\n<p><strong>Key Expert 1: Team Leader / Project Manager</strong></p>\n\n<p><strong>Key Expert 2: Business Analyst Expert</strong></p>\n\n<p><strong>Key Expert 3: Developer/Digital Transformation Architect</strong></p>\n\n<p>Bidders may propose additional non-key experts as they see fit to successfully deliver the scope of work.</p>\n\n<p>Required Qualifications</p>\n\n<p>All experts must be fluent in English and Arabic (written and spoken). The minimum required qualifications for the Key Experts are as follows:</p>\n\n<p><strong>Key Expert 1: Team Leader / Project Manager</strong></p>\n\n<ul>\n\t<li>Education: Master&rsquo;s degree in public administration, Business Administration, Project Management, or a related field.</li>\n\t<li>Professional Certification: PMP, PRINCE2, or Agile/Scrum Master certification is mandatory.</li>\n\t<li>General Experience: Minimum 10 years of professional experience in managing complex, large-scale reform or transformation projects.</li>\n\t<li>Specific Experience: Minimum 5 leading digital transformation, business process re-engineering, or public sector modernization projects.</li>\n\t<li>Proven track record in managing rapid-cycle or pilot projects with tight deadlines.</li>\n\t<li>Experience in the MENA region or Lebanon is highly desirable.</li>\n\t<li>Experience developing and delivering training programs for public sector employees undergoing digital transformation.</li>\n</ul>\n\n<p><strong>Key Expert 2: Senior Business Process Re-engineering (BPR) Expert</strong></p>\n\n<ul>\n\t<li>Education: Bachelor&rsquo;s degree in industrial, Business Administration, Information Technology, or a related field.</li>\n\t<li>Professional Certification: Lean Six Sigma, or a similar process improvement methodology is highly desirable.</li>\n\t<li>General Experience: Minimum 7 years of experience in business analysis, operations management or management consulting, business process analysis, and process re-engineering.</li>\n\t<li>Specific Experience: minimum 5 years of specific experience in process mapping (&quot;as-is&quot;) and redesigning (&quot;to-be&quot;) public services or sector services. Experience with service-oriented methodologies and process optimization.</li>\n\t<li>Must have experience in &quot;Digital Service Design<strong>&quot;, </strong>translating business processes into functional requirements or user stories for software developers.</li>\n\t<li>Proven experience in developing Standard Operating Procedures (SOPs) and User Manuals.</li>\n\t<li>Fluency in Arabic is mandatory for reviewing existing laws, forms, and administrative circulars.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Key Expert 3: Senior Digital Solution Architect </strong></p>\n\n<ul>\n\t<li>Education: bachelor&rsquo;s or master&rsquo;s degree in computer science, software engineering, Information Technology, or a related field.</li>\n\t<li>General Experience: Minimum of 8 years of professional experience in software development, systems, architecture, and web technologies.</li>\n\t<li>Specific Experience: Minimum 5 years of experience in designing and deploying e-government services or digital workflows, including secure electronic approvals or signature-enabled processes.</li>\n\t<li>Proven Experience with API integration and interoperability standards.</li>\n\t<li>Experience with rapid application development tools, low-code platforms, or form builders is highly desirable.</li>\n</ul>\n\n<ul>\n\t<li>Solid Knowledge of cybersecurity standards, and data protection protocols.</li>\n</ul>\n\n<ol>\n\t<li>Reporting Requirements</li>\n</ol>\n\n<p>The Consultant&rsquo;s reporting obligations are divided into two distinct categories: Contractual Deliverables and Administrative Progress Reports.</p>\n\n<p><strong>11.1 Contractual Deliverables (Payment Milestones)</strong></p>\n\n<p>These outputs are directly linked to the payment schedule defined in the Deliverables Table (Section 6). Payments will only be released upon formal written acceptance of these specific documents by the TC.</p>\n\n<ul>\n\t<li>D1: Inception Report and Agile Roadmap: Finalizes the work plan, methodology, and scope.</li>\n\t<li>D2: Summary Report on the Initial Data Collection Exercise and Consultations.</li>\n\t<li>D3&ndash;D5: Sprint Wave Reports: Documentation of technical deployment on the National Portal, including BRDs and FSDs.</li>\n\t<li>D6: Final Report: Capturing lessons learned and scale-up recommendations.</li>\n</ul>\n\n<p><strong>11.2 Administrative Progress Reporting (Monitoring Only)</strong></p>\n\n<p>These reports are for performance monitoring and coordination purposes.</p>\n\n<ul>\n\t<li>Monthly Progress Reports: The Consultant shall submit concise monthly reports detailing activities completed, progress against the agile timeline, and planned activities.</li>\n\t<li>Bi-Weekly Progress Meetings: The Consultant&rsquo;s team will participate in bi-weekly meetings with the project team to present findings and status updates.</li>\n</ul>\n\n<p><strong>11.3 Enforcement of Reporting Compliance</strong></p>\n\n<p>Timely submission of Administrative Progress Reports (as defined in Section 11.2) is a material obligation of the Consultant and considered an integral part of the deliverables and related acceptance.</p>\n\n<ol>\n\t<li>OMSAR and OMSTAI Inputs</li>\n</ol>\n\n<p>To facilitate the successful execution of the assignment, OMSAR and OMSTAI shall provide the following:</p>\n\n<ul>\n\t<li>Data and Documentation: Access to all relevant background documents, including existing service catalogs, process maps, and any data collected in earlier phases.</li>\n\t<li>Access to Stakeholders: Facilitation of and access to relevant stakeholders for interviews, workshops, and validation sessions, including staff in participating ministries, oversight bodies, and SOEs.</li>\n\t<li>Technical Committee (TC): Designation of members from OMSAR and OMSTAI and participating entities where applicable, to provide guidance, support integration, and ensure day-to-day collaboration.</li>\n\t<li>Timely Feedback: Provision of timely and consolidated feedback on all draft deliverables submitted by the consultant.</li>\n</ul>\n\n<ol>\n\t<li>Environmental and Social Considerations</li>\n</ol>\n\n<p>The Firm shall integrate environmental and social principles consistent with the World Bank Environmental and Social Framework (ESF) throughout the redesign and development of e-services. All work must ensure:</p>\n\n<ul>\n\t<li>Inclusive and accessible service design, compliant with recognized accessibility standards (e.g., WCAG 2.1 AA), and responsive to the needs of persons with disabilities and digitally vulnerable groups.</li>\n\t<li>Privacy-by-design and cybersecurity-by-design, ensuring secure handling of any information used during service diagnostics, prototyping, or pilot testing.</li>\n\t<li>Non-discriminatory service access, with redesign decisions avoiding barriers related to gender, language, or socioeconomic status.</li>\n\t<li>Basic environmental good practice in managing ICT resources, including minimizing unnecessary hardware use and ensuring responsible handling or disposal of any digital equipment used in testing.</li>\n</ul>\n\n<p>These considerations should be reflected in service workflows, user experience recommendations, prototypes, and final technical outputs.</p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p>\n\n<p><strong>CONSULTANT&rsquo;S QUALIFICATIONS BASED SELECTION (CQS)</strong></p>\n\n<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government<em> </em></strong></p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:606px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Name of Project</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:329px\">\n\t\t\t<p><strong>GFPP for Lebanon Digital Acceleration Project (LDAP)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Loan No/Credit No/ Grand Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>TF0C8895</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Assignment Title</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Procurement Plan Ref Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>LB-OMSAR-537752-CS-CQS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:277px\">\n\t\t\t<p><strong>Country of Delivery </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:329px\">\n\t\t\t<p><strong>Lebanon</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>The <strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong> has received financing from the World Bank toward the cost of the <strong>Preparation Grant for the Lebanon Digital Acceleration Project (LDAP) </strong>and intends to apply part of the proceeds for the following consulting services.</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include the <strong>end-to-end improvement and digital transformation of six (6) priority public services</strong> within selected sectors/clusters. The assignment utilizes an <strong>agile methodology</strong> (MVP, alpha, and beta stages) to diagnose &quot;As-Is&quot; processes, redesign &quot;To-Be&quot; workflows, classify data according to the National Data Classification Policy, and integrate electronic signature use cases. The Consultant will configure these services on Lebanon&rsquo;s <strong>National Portal</strong>, a low-code automation platform, and provide capacity building for civil servants. The estimated implementation period is <strong>five (5) months</strong> from the contract commencement date.</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment is attached to this REOI<em>.</em></p>\n\n<p>OMSAR now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>The attention of interested Consultants is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers dated September 2025 (&ldquo;the Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p>The best qualified firm to carry out the services will be selected in accordance with the Consultant&rsquo;s Qualifications Based Selection (CQS) method set out in the Regulations and based on the following criteria:</p>\n\n<p>Mandatory Minimum Requirements:</p>\n\n<ul>\n\t<li><strong>Core Business and Longevity:</strong> The firm must be a legally registered entity with at least <strong>ten (10) years</strong> of demonstrated experience in Management Consulting, Digital Transformation, and Information Technology.</li>\n\t<li><strong>Similar Contract Experience:</strong> Proven track record with at least <strong>two (2) similar contracts</strong> successfully completed within the last <strong>seven (7) years</strong>. A &quot;similar contract&quot; must involve:\n\t<ul>\n\t\t<li><strong>Scope:</strong> End-to-end digital transformation, including business process re-engineering (BPR) and deployment of e-services.</li>\n\t\t<li><strong>Context:</strong> Projects implemented specifically for <strong>Public Sector clients</strong> (Ministries or Government Agencies).</li>\n\t\t<li><strong>Scale:</strong> Redesign and digitization of multiple services simultaneously or sector-wide reforms.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>Desirable Requirements (Technical and Managerial Capability):</p>\n\n<ul>\n\t<li><strong>Organizational Capacity:</strong> Demonstrated ability to manage complex, multi-disciplinary projects (strategy, operations, and technology) simultaneously.</li>\n\t<li><strong>Specific Technical Expertise:</strong> In-house expertise in User-Centric Design (UX/UI), secure software development, and the application of <strong>data governance and e-signature mechanisms</strong>.</li>\n\t<li><strong>Regional Experience:</strong> Experience in the <strong>MENA region</strong> or Lebanon is highly desirable.</li>\n\t<li><strong>Change Management:</strong> Proven experience in delivering capacity building and training programs for government staff.</li>\n</ul>\n\n<p>(Note: The qualifications and experience of Key Experts shall not be evaluated at this shortlisting stage).</p>\n\n<p>To ensure a complete submission, the Expression of Interest (EOI) <strong>must include the following minimum documentation:</strong></p>\n\n<ul>\n\t<li><strong>Documented Evidence of Experience:</strong> Detailed references for similar projects, accompanied by <strong>Contract Award Notices and/or Completion Certificates</strong>.</li>\n\t<li><strong>Bilingual Capability Statement:</strong> Written confirmation of the ability to deliver all reports and portal configurations in both English and Arabic.</li>\n\t<li><strong>Conflict of Interest Disclosure:</strong> A signed statement confirming no conflict of interest as per the Regulations.</li>\n\t<li><strong>Joint Venture (JV) Requirements:</strong> If applying as a JV, a letter of intent or existing agreement must be provided, identifying the <strong>Lead Firm</strong> and specifying that all partners shall be <strong>jointly and severally liable</strong>.</li>\n</ul>\n\n<p>Further information can be obtained at the address below during office hours (09:00 AM to 04:00 PM Beirut Time).</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>COB 28 April, 2026. </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Office of the Minister of State for Administrative Reform (OMSAR)</strong></p>\n\n<p>Technical Unit &ndash; Preparation Grant for Lebanon Digital Acceleration Project</p>\n\n<p><strong>Attn</strong>: Ms. Mirvat Hammoud &ndash; Procurement Specialist</p>\n\n<p><strong>Address</strong>: STARCO Building, Bloc A, 5th Floor, Room 505a</p>\n\n<p>Omar Daouk Street, Mina El Hosn Sector</p>\n\n<p>Beirut, Lebanon</p>\n\n<p><strong>Tel</strong>: +961 (1) 371 505; ext. 160</p>\n\n<p><strong>E-mail</strong>: <em>mhammoud@omsar.gov.lb</em></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Attachment: Terms of Reference (TOR)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p><strong>PREPARATION GRANT FOR LEBANON DIGITAL ACCELERATION PROJECT (P181954)</strong></p>\n\n<p><strong>E-Services, Business Process Reengineering Foundational Work as part of Re-Inventing Government </strong></p>\n\n<ol>\n\t<li>Background</li>\n</ol>\n\n<p>Lebanon&rsquo;s public administration has remained largely unchanged for decades, operating with outdated structures, fragmented mandates, widespread vacancies, and weak digital and human capital systems. Combined with paper-based processes, siloed information systems, and manual approval workflows, these constraints have resulted in inefficient service delivery, duplication of roles, limited transparency, and a growing gap between government capabilities and citizen expectations.</p>\n\n<p>&nbsp;</p>\n\n<p>In response, the Government of Lebanon, with support from the World Bank, as part of the Lebanon Digital Acceleration Project (LDAP), is undertaking a strategic investment aimed at modernizing public administration and strengthening the core digital enablers required for trusted digital service delivery. To support project readiness, the World Bank&rsquo;s Grant Facility for Project Preparation (GFPP) has been extended to the Office of the Minister of State for Administrative Reform (OMSAR). The GFPP grant is implemented by a Technical Unit (TU) housed within OMSAR.</p>\n\n<p>&nbsp;</p>\n\n<p>In parallel, OMSAR, under direct government sponsorship, has launched &ldquo;Reinventing Government 2030&rdquo; a whole of government reform effort that aims to restructure the public sector into a coherent, citizen centric, mission driven public administration.</p>\n\n<p>&nbsp;</p>\n\n<p>The reform is structured in phases progressively building toward implementation. It began with the Stakeholders&rsquo; Aspirations phase, which defined a forward-looking vision for Lebanon&rsquo;s public administration and establishing guiding design principles. This phase has been completed. It is followed by the development of a <em>Blueprint for Public Sector Reform</em>, encompassing baseline assessments and benchmarking of current institutions and services, and the piloting of the proposed model across selected ministries. The final phase focus is on implementation, including the re-engineering and digitization of priority public services, supported by the necessary legal and regulatory changes.</p>\n\n<p>&nbsp;</p>\n\n<p>To support service transformation under this agenda, OMSAR is advancing key digital foundations as part of the LDAP. These efforts will be undertaken by OMSAR and OMSTAI within their mandates and technical expertise and in coordination with relevant stakeholders, ensuring consistency with national digital transformation, national digital trust, data governance, and interoperability frameworks. This includes the development of a National Data Classification Policy, as well as targeted support to the electronic signature framework under the existing legal system. In particular, OMSAR will work closely with the Lebanese Accreditation Council (COLIBAC) to support the definition of practical requirements and baseline criteria for electronic signature accreditation and use.</p>\n\n<p>&nbsp;</p>\n\n<p>The activities are intended to be implemented in parallel and informed by practical application in real service contexts. Within this framework, e-services constitute the operational layer through which institutional reform and key digital enablers are translated into tangible improvements in service delivery.</p>\n\n<p>&nbsp;</p>\n\n<p>As part of the preparatory work, an initial service prioritization exercise across several ministries has been carried out to identify potential candidate services for the assignment. Indicative examples of such services, and which are non-exhaustive and non-binding, and are subject to further validation, include digital diploma attestation, trader registration and clearance services, tourism licensing digitization, payment of fees for investment and right-of-way services, and selected municipal and sectoral permits.</p>\n\n<p>&nbsp;</p>\n\n<p>The redesign and digitization of selected priority public services will enable the practical piloting of data classification and the integration of one or more electronic signature use cases within end-to-end government workflows.</p>\n\n<p>&nbsp;</p>\n\n<p>This initiative will create a controlled environment to apply data classification rules and electronic signature mechanisms in practice, generate actionable lessons, and support future scale-up under the full LDAP through a phased and realistic expansion of digital public services in Lebanon.</p>\n\n<ol>\n\t<li>Assignment and Objective</li>\n</ol>\n\n<p>The objective of this assignment is to establish an evidence-based, end-to-end improvement of priority public services within selected sector(s)/cluster(s). This will be achieved through an agile approach, utilizing MVP (Minimum Viable Product), alpha, and beta stages. This requires various iterations in diagnosing current service processes and organizational arrangements, redesigning workflows to remove pain points and operational bottlenecks, digitizing service-delivery practices, applying data classification requirements and operationalizing one or more electronic signature use cases within real government workflows to ensure consistent execution.</p>\n\n<p>&nbsp;</p>\n\n<p>The assignment will demonstrate a full transformation cycle, that will inform future scaling, covering process re-engineering, technology enablement and civil servants&rsquo; operational readiness, and will generate validated lessons to inform future scaling across other services and sectors. Ultimately, the project aims to provide concrete execution that will strengthen public trust and citizen experience, streamline government operations, enhance transparency, and promote more efficient and accountable use of public resources.</p>\n\n<p>This will be achieved by:</p>\n\n<ol>\n\t<li><strong>Diagnosing and mapping</strong> current service processes, including assessing regulatory, policy and organizational arrangements across the involved entities, reviewing existing systems and platforms, and identifying main pain points for the citizen and the civil servants;</li>\n\t<li><strong>Collecting and analyzing</strong> service-related data and applying the National Data Classification Policy to classify data used within the selected services;</li>\n\t<li><strong>Redesigning</strong> workflows and ministry service points to eliminate pain points, inefficiencies, and bottlenecks identified during the diagnostic phase; and</li>\n\t<li><strong>Digitizing and enabling</strong> service-delivery processes on the National Portal to ensure consistent, scalable, and user-centric execution, and integrating one or more electronic signature use cases, in line with the existing legal, institutional, and policy frameworks.</li>\n</ol>\n\n<p><strong>Not</strong><strong>e:</strong> Integration shall rely on existing systems and available APIs. The Consultant will be responsible for integrating services with the National Portal using existing APIs and interfaces where available. The development of new APIs is not required under this assignment.</p>\n\n<p>The National Portal is a low-code platform that supports workflow automation. It allows the creation of reusable libraries and modular service components that can be configured and reconfigured across different services, supporting integration and the transition from paper-based procedures to structured and traceable digital processes.</p>\n\n<ol>\n\t<li>Scope of Work</li>\n</ol>\n\n<p>The Consultant will implement the redesign and digitally transform 6 priority services. These services will be selected through a collaborative process where the Consultant proposes a list of 10-12 proposed services, which are then shortlisted and approved to arrive at the final 6. As part of the assignment, data associated with the selected services will be collected, analyzed, and classified in line with the proposed National Data Classification Policy, and one or more electronic signature use cases will be operationalized within selected service workflows, in accordance with the applicable legal and institutional framework. For each service, the scope of work includes:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Confirming the service scope, stakeholders, boundaries and interministerial dependencies to clarify objectives and ensure alignment with cross government digital enablers;</li>\n\t<li>Conducting an as is diagnostic to map current service workflows, roles, handoffs, pain points and bottlenecks (from citizen and civil servant perspectives) and to analyze all relevant or potential regulatory, policy and cross government dependencies such as e-signature application, data governance and classification rules, and future digital identity/trust requirements;</li>\n\t<li>Designing a streamlined, digitization ready &ldquo;to be&rdquo; service workflow that removes bottlenecks, simplifies approvals, and reasonably aligns with the existing legal and trust framework;</li>\n\t<li>Proposing functional and non‑functional elements (including security, privacy, interoperability and performance), acceptance criteria and operating roles for the redesigned service, in line with existing applicable frameworks;</li>\n\t<li>Developing, configuring, testing, validating, and operationally rolling out the digitized services in accordance with the approved &ldquo;to-be&rdquo; design, including the integration of cross-government digital enablers (e.g., data classification controls, electronic signature use cases, interoperability components, and trust services; and</li>\n\t<li>Civil servants enablement and capacity building for service operations, ensuring that personnel across participating entities are equipped to operate, manage, and sustain the transformed services.</li>\n</ol>\n\n<p>The complexity layer defined in the table below assesses the level of effort, coordination, legal change, and technical integration required to redesign and digitize the initial pool of 10&ndash;12 proposed services, from which the final list of six services will be selected.</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:104px\">\n\t\t\t<p><strong>Complexity layer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf; width:398px\">\n\t\t\t<p><strong>Definition (how to interpret complexity)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#e7e6e6; border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:1px solid #bfbfbf\">\n\t\t\t<p><strong>Minimum distribution across 10-12 services</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:120px; width:104px\">\n\t\t\t<p><strong>High</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:120px; width:398px\">\n\t\t\t<p>Requires significant cross-entity coordination and/or end-to-end workflow redesign; multiple approval points; complex integrations (e.g., interoperability/API dependencies), high institutional and legislative change load, and/or heightened data/sensitivity considerations.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:120px\">\n\t\t\t<p><strong>At most 2</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:103px; width:104px\">\n\t\t\t<p><strong>Medium</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:103px; width:398px\">\n\t\t\t<p>Moderate redesign and coordination requirements; limited number of entities; some integration needs; manageable procedural/legal constraints; moderate change load for staff and operations.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:103px\">\n\t\t\t<p><strong>At least 4</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:1px solid #bfbfbf; border-right:1px solid #bfbfbf; border-top:none; height:85px; width:104px\">\n\t\t\t<p><strong>Low</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:85px; width:398px\">\n\t\t\t<p>Contained workflow and limited stakeholders; minimal integration; simpler procedural/legal footprint; low change load; can be digitized with relatively standard patterns.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #bfbfbf; border-left:none; border-right:1px solid #bfbfbf; border-top:none; height:85px\">\n\t\t\t<p><strong>At least 4</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The prioritization and selection of services will be guided by a set of criteria aligned with the LDAP design and objectives. These include: (i) expected number of users or beneficiaries and the potential to improve citizen experience at scale; (ii) magnitude of the anticipated developmental impact, including improvements in transparency, efficiency, and service delivery outcomes; (iii) potential to benefit vulnerable groups, including low-income, conflict-affected, and climate-vulnerable populations, as well as women and girls; (iv) readiness for digitization, taking into account existing technological, institutional, and legal conditions; (v) sustainability and the potential for scaling beyond the pilot phase; (vi) feasibility of achieving end-to-end digitalization; and (vii) the ability to leverage existing / future national digital foundations and enablers, such as digital identity, data sharing frameworks, and data governance systems.</p>\n\n<ol>\n\t<li>Key Activities</li>\n</ol>\n\n<p>This assignment will operationalize the transformation agenda by translating previously developed frameworks into practical, service-level improvements. It will provide the evidence, design solutions, and implementation of insights required to validate the Target Operating Model and demonstrate how re-engineered, digitally enabled services supported by data classification and electronic signature use cases can be delivered in practice and scaled across government.</p>\n\n<p>Building on the frameworks, interaction models, and sector analyses developed under earlier deliverables, the selected firm will lead the end-to-end implementation of priority services within the selected sector(s)/cluster(s). The assignment follows a structured, outcome-oriented approach covering service assessment, workflow redesign, data classification, digitization, and the operationalization of electronic signature use cases, as detailed below.</p>\n\n<p><strong>Deliverable D1:</strong> <strong><em>Inception Report and Agile Roadmap.</em></strong></p>\n\n<p>Prepare and submit an inception report as a deliverable, that shall include:</p>\n\n<ol>\n\t<li>A validated understanding of the assignment context, objectives, scope including confirmation of stakeholders, boundaries, and dependencies;</li>\n\t<li>A detailed workplan and timeline aligned with the agreed deliverables, including validation milestones and decision gates;</li>\n\t<li>A methodology and engagement approach, including developing data / information gathering templates from the various service providers and ministries, and describing data collection, analysis techniques, and stakeholder engagement;</li>\n\t<li>A description of the agile approach (delivery stages - MVP, alpha and beta, sprint structure, sequencing approach and governance arrangements for iterative delivery and approvals); and</li>\n\t<li>An initial risk assessment and mitigation strategy.</li>\n</ol>\n\n<p><strong>Deliverable D2:</strong> <strong><em>Initial Data Collection and Preliminary Consultations </em></strong><em>to Inform the Subsequent Phases, Including the Shortlisting of Services.</em></p>\n\n<p>Present a summary on the initial data collection exercise and consultations:</p>\n\n<ol>\n\t<li>Minimum data collection exercise leveraging previous work conducted and related to the service data collection efforts, catalogs, and existing documentation</li>\n\t<li>Rapid consultations with relevant service owners and stakeholders to validate service scope, relevance, and key dependencies; and</li>\n\t<li>Confirm the initial list of 10-12 candidate services out of which the final set of services to be digitalized will be selected.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Deliverables D3-D5(three sprint waves):</strong> <em>Agile End-to-End </em>Service <em>Transformation, Deployment, Monitoring and Capacity Building.</em></p>\n\n<p>The Consultant shall implement the assignment using a structured agile, sprint-based approach, progressing services iteratively from discovery to working Minimum Viable Product (MVP) delivery and validation. Services shall be advanced in<strong> pairs (two services per sprint wave) </strong>and be configured and deployed through the National Portal. Each sprint wave shall follow a defined cycle of discovery, co-design, build, test, user validation, and retrospective review.</p>\n\n<p>Progression to subsequent sprint waves shall be contingent upon formal validation of the MVPs of the preceding wave and completion of sprint retrospectives capturing lessons learned, reusable components, and required adjustments.</p>\n\n<p>&nbsp;As stated above, the digitalization of services under will be implemented through the National low-code platform that enables workflow automation and service configuration with minimal need for custom software development. Under this approach, the Consultant will design and configure service workflows, data structures, business rules, and integration points within the platform, with minimal development of custom code. These configurations are executed by the platform to deliver fully functional digital services. The Consultant will therefore focus on preparing structured workflows, functional specifications, and integration logic that can be deployed on the platform, ensuring that services are delivered in a standardized, secure, and user-accessible format. The platform supports the use of reusable components, libraries, and modular building blocks, which can be configured and adapted across multiple services to improve efficiency and scalability.</p>\n\n<p>The Consultant will hence be able to leverage the platform&rsquo;s flexibilities, continuously improving across waves through by reusing configurable libraries, workflow blocks, and integration components developed on the National Portal.</p>\n\n<p>Activities under this deliverable shall include:</p>\n\n<ol>\n\t<li>Progressive selection and preliminary assessment of candidate services from an initial pool of 10-12 services, including evaluation of impact, complexity, feasibility (legal and technical), and institutional readiness;</li>\n\t<li>Validation meetings with the relevant ministries/entities for each candidate service to confirm service scope and boundaries, responsible and participating entities (service owner and process owner), decision/approval authority, inter-ministerial dependencies, current workflow realities, implementation readiness, and assessment existing digital systems;</li>\n\t<li>The Consultant must obtain formal written endorsement from the Technical Committee (TC) in coordination with the concerned ministries prior to initiating detailed mapping and redesign activities. The endorsement shall confirm approval of the agile implementation approach, agreement on the selected service(s), and the nomination of a dedicated focal point to ensure ongoing coordination and decision-making;</li>\n\t<li>Service-level baseline (&ldquo;As-Is&rdquo;) mapping for each service entering the sprint cycle, including current workflows, roles, hand-offs, approvals, bottlenecks, data flows, governance procedures, and legal, procedural, and technical constraints, together with documentation of baseline requirements and operational readiness prerequisites to inform redesign and digitization. The Consultant shall submit a detailed Business Requirements Document (BRD) reflecting the findings from the mapping and stakeholder engagement;</li>\n\t<li>Iterative redesign of current services to make them streamlined, digitization-ready &ldquo;To-Be&rdquo; workflows. Classify the data elements related to the services in accordance with the National Data Classification Framework and proposed Policy. Where the redesigned service includes approvals, signatures, and authentication steps, assess and implement the appropriate electronic signature use cases in alignment with the existing legal and institutional framework;</li>\n\t<li>Definition of functional and non-functional requirements for the redesigned and digitized service (not the legacy workflow), including security, privacy, interoperability, performance, user stories, acceptance criteria, operating roles, and system integration requirements, ensuring that redesigned workflows are compatible with and can be deployed through the National Portal. The consultant must submit a functional specification document (FSD) on the redesigned service that will go into the low-code platform;</li>\n\t<li>Identification of enabling legislative, regulatory, or policy adjustments required to operationalize the redesigned digital service and ensure alignment with cross-government digital enablers;</li>\n\t<li>Iterative configuration, development, testing, deployment, and stakeholder validation (including demos and UAT where applicable), resulting in working MVP/alpha versions for the services that successfully progress through the sprint cycle;</li>\n\t<li>Development and progressive enhancement of a service performance monitoring dashboard, including:</li>\n</ol>\n\n<ul>\n\t<li>Definition of service-level KPIs.</li>\n\t<li>Configuration of the selected services dashboard using the existing platform toolkit, to be used by authorized users based on agreed access rights, during their respective sprint wave.</li>\n\t<li>Incremental onboarding of additional services to the dashboard in subsequent sprints.</li>\n</ul>\n\n<ol>\n\t<li>Delivery of hands-on training and capacity-building sessions as part of each sprint wave, covering:</li>\n</ol>\n\n<ul>\n\t<li>Operation of the digitized service.</li>\n\t<li>Use of the monitoring dashboard.</li>\n\t<li>Governance and oversight responsibilities.</li>\n</ul>\n\n<p>Throughout D3&ndash;D5, the Consultant shall apply core agile principles, including time-boxed sprints, continuous stakeholder engagement, rapid feedback loops, and formal sprint retrospectives to ensure adaptive delivery, risk reduction, and scalable reuse across services. To initiate the release of payments associated with these deliverables, the Consultant must provide documented evidence of satisfactory delivery. This shall include a Certificate of Delivery of Services issued by the Consultant, and submitted to the Grant Coordinator, and subsequently validated and approved by the TC.</p>\n\n<p><strong>Deliverable D6:</strong> <em>Lessons Learned and Scale-Up Recommendations (Final Report).</em></p>\n\n<p>Capture and document lessons learned from the implementation and recommendations to inform the scale-up of service redesign and digitization to additional clusters/sectors. This deliverable will include:</p>\n\n<ol>\n\t<li>Analysis of what worked well and what challenges emerged across service redesign, data classification, and e-signature implementation;</li>\n\t<li>Identification of enablers and constraints related to institutional arrangements, inter-entity coordination, and operational readiness;</li>\n\t<li>Recommendations for improving processes, governance, and technical approaches in future phases;</li>\n\t<li>Guidance on future implementation sequencing, capacity building and policy reforms required to support sustainable digital service delivery; and</li>\n\t<li>Identification of potential risks and mitigation strategies for scaling and future implementation.</li>\n</ol>\n\n<ol>\n\t<li>Project Oversight and Management Structure</li>\n</ol>\n\n<p>A Technical Committee (TC) will be established to provide strategic direction, oversight, and effective management of this engagement. Chaired by the Grant Coordinator and composed of members from OMSAR, OMSTAI, and the involved ministries as applicable, the TC &nbsp;&nbsp;&nbsp;serve as the primary governing body responsible for reviewing the firm&rsquo;s progress and ensuring alignment with beneficiary requirements and national digital transformation goals.</p>\n\n<p>For the purpose of this assignment, the TC is the sole authority empowered to formally accept and approve project deliverables. Approval of each milestone deliverable by TC is a mandatory prerequisite for the release of corresponding payments. The Consulting firm shall provide regular updates and shall submit required Deliverables and reports through the Grant Coordinator to the TC, in addition to official invoice for payment upon the TC formal written acceptance of each deliverable.</p>\n\n<ol>\n\t<li>Deliverables Table</li>\n</ol>\n\n<p>The assignment will be completed over a total period of 5 months from the contract commencement date. The contract commencement date is defined as the date of formal written notification issued by OMSAR to the Consultant to start the work, following the successful completion of the Project Kickoff meeting.</p>\n\n<p>&nbsp;</p>\n\n<p>The consultant must submit all deliverables in English and in Arabic in a format to be agreed upon with TC. The provisional timetable is as follows:</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse; width:624px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; height:43px; width:138px\">\n\t\t\t<p><strong>Deliverables</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:168px\">\n\t\t\t<p><strong>Description &amp; Key Components</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:102px\">\n\t\t\t<p><strong>Timeline (Cumulative)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:83px\">\n\t\t\t<p><strong>Approvals Required</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; height:43px; width:133px\">\n\t\t\t<p><strong>Payment Terms (% of Contract Total Value)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:97px; width:138px\">\n\t\t\t<p><strong>D1</strong> <em>Inception Report and Agile Roadmap</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:168px\">\n\t\t\t<p>Validated scope for services, detailed workplan, and agile sprint structure</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:102px\">\n\t\t\t<p>Week 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:133px\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:97px; width:138px\">\n\t\t\t<p><strong>D2</strong> <em>Summary Report on the initial data collection exercise and consultations</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:168px\">\n\t\t\t<p>Initial data collection exercise, consultations, and confirmation of the initial list of 10-12 candidate services.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:102px\">\n\t\t\t<p>Week 4</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:97px; width:133px\">\n\t\t\t<p><strong>15%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:77px; width:138px\">\n\t\t\t<p><strong>D3</strong> <em>First sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile</em><em> Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:102px\">\n\t\t\t<p>Week 9</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:77px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:41px; width:138px\">\n\t\t\t<p><strong>D4</strong> <em>Second sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:102px\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Week 14</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:41px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:82px; width:138px\">\n\t\t\t<p><strong>D5</strong> <em>Third sprint of 2 services</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:168px\">\n\t\t\t<ul>\n\t\t\t\t<li><em>Agile Service Discovery, Redesign, and Initial Digital Deployment</em></li>\n\t\t\t\t<li><em>Performance Monitoring Dashboard</em></li>\n\t\t\t\t<li><em>Training Materials and Capacity Building for Service Operations</em></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:102px\">\n\t\t\t<p>Week 19</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:83px\">\n\t\t\t<p><strong>TC &amp; Entities</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:82px; width:133px\">\n\t\t\t<p><strong>20%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:75px; width:138px\">\n\t\t\t<p><strong>D6</strong> <em>Final Report &amp; Lessons Learned and Scale-Up Recommendations </em></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:168px\">\n\t\t\t<p>Analysis of results, lessons learned, and future scale-up recommendations</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:102px\">\n\t\t\t<p>Week 21</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:83px\">\n\t\t\t<p><strong>TC</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:75px; width:133px\">\n\t\t\t<p><strong>15%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li><strong>&nbsp;</strong>Payment Terms and Administrative Requirements</li>\n</ol>\n\n<p><strong>7.1 General Payment Conditions</strong></p>\n\n<ul>\n\t<li><strong>Total Contract Value</strong>: Payments shall be made in installments according to the percentages defined in <strong>Section 6: Deliverables Table</strong>.</li>\n\t<li><strong>Currency and Format</strong>: All invoices must be submitted in the currency specified in the contract and must be accompanied by the relevant bilingual (English/Arabic) deliverable.</li>\n\t<li><strong>Ownership</strong>: Final release of payment for any deliverable is contingent upon the transfer of all intellectual property, including, without limitation, all source-code, data, documents, systems information, architectures, security controls, processes, policies, designs, specifications, source materials, and other information, whether in written, oral, visual, electronic, or any other form, to the Government of Lebanon.</li>\n</ul>\n\n<p><strong>7.2 The TC Approval Gate</strong></p>\n\n<p>The Technical Committee (TC) serves as the sole authority for the acceptance of services. The following administrative process applies to every milestone:</p>\n\n<ul>\n\t<li><strong>Submission</strong>: The Consultant shall submit the deliverable and a concise summary report to the TC Chairperson.</li>\n\t<li><strong>Review Period</strong>: The TC will review the submission for technical accuracy and alignment with the National Data Classification Policy and e-signature framework.</li>\n\t<li><strong>Validation Requirement</strong>: For all deliverables, payment cannot be processed without written validation and sign-off from the TC. In addition to the summary report, the Consultant must submit a Certificate of Delivery of Services.</li>\n\t<li><strong>Formal Acceptance</strong>: The signature of the Grant Coordinator, accepting deliverables and approving the Certificate of Delivery of Services, is a mandatory prerequisite for the release of payment.</li>\n</ul>\n\n<p><strong>7.3 Invoicing Requirements</strong></p>\n\n<p>To initiate a payment, the Consultant must submit to the Grant Coordinator an administrative package containing:</p>\n\n<ol>\n\t<li><strong>Official Invoice</strong>: Referencing the contract number and specific deliverable code (D1&ndash;D6).</li>\n\t<li><strong>Certificate of Delivery of Services: </strong>A formal certificate signed by the Consultant, accompanied by the Deliverable itself and a Concise Summary Report documenting the completion of specific contractual milestones.</li>\n\t<li><strong>Progress Evidence</strong>: For technical stages, evidence of configuration/deployment on the National Portal must be demonstrated.</li>\n</ol>\n\n<p><strong>Attendance Sheets</strong>: Signed logs of training participants must be attached as proof of capacity building.</p>\n\n<p><strong>7.4 Delays and Escalations</strong></p>\n\n<ul>\n\t<li>If a beneficiary entity delays the functional validation of a service (D3) beyond <strong>5 working days</strong>, the Consultant must immediately escalate the matter to the TC for intervention and final decision and to prevent payment bottlenecks.</li>\n</ul>\n\n<p>Payments will be processed within the timeframe specified in the contract conditions following the formal receipt of a &quot;complete&quot; invoice package.</p>\n\n<ol>\n\t<li>Duration of the assignment and estimated key staff-months input</li>\n</ol>\n\n<p>The total duration of the assignment is 5 months from the date of contract signature.</p>\n\n<p>The distribution of Level of Effort for all proposed Key Experts should be detailed in the bidder&rsquo;s technical and financial proposals.</p>\n\n<ol>\n\t<li>Firm Qualifications\n\t<ol>\n\t\t<li><strong>General Corporate Experience</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<ul>\n\t<li>The Firm (or Lead Firm in case of a Joint Venture) must be a legally registered entity with at least ten (10) years of demonstrated experience in the fields of Management Consulting, Digital Transformation, and Information Technology.</li>\n\t<li>The Firm must demonstrate a stable financial standing and the organizational capacity to manage complex, multi-disciplinary projects (strategy, operations, and technology) simultaneously.\n\t<ol>\n\t\t<li>&nbsp;<strong>Specific Project Experience</strong></li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The Firm must demonstrate a proven track record by submitting reference details for at least two (2) similar contracts successfully completed within the last seven (7) years. A &quot;similar contract&quot; is defined as follows:</p>\n\n<ul>\n\t<li>Scope: End-to-end digital transformation of public and private services (at least 2 public services), including business process re-engineering, service simplification, and the actual digitization/deployment of e-services.</li>\n\t<li>Context: Projects implemented specifically for Public Sector clients (Ministries, Government Agencies, or Public Institutions). Experience in the private sector alone should not be considered sufficient given the specific regulatory and bureaucratic complexities of the public sector.</li>\n\t<li>Scale: Projects involving the redesign and digitization of multiple services simultaneously or the implementation of sector-wide digital reforms.\n\t<ol>\n\t\t<li><strong>Technical Capabilities</strong></li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The Firm must demonstrate in its profile that it possesses in-house expertise or established partnerships in:</p>\n\n<ul>\n\t<li>User-Centric Design: Methodologies for service design (e.g., Human-Centered Design, UX/UI).</li>\n\t<li>End‑to‑end digital transformation or BPR of public services, including business process re‑engineering and service simplification.</li>\n\t<li>Software Development: Capabilities in developing secure, interoperable web-based applications and dashboards.</li>\n\t<li>Data and Trust Enablers: Experience applying data governance, data classification, data protection, and/or electronic approval or signature mechanisms within digital public services or government workflows.</li>\n\t<li>Change Management: Experience in delivering capacity building and training programs for government staff.</li>\n</ul>\n\n<ol>\n\t<li>Expected Key Experts</li>\n</ol>\n\n<p>The consultant&#39;s team shall be composed of qualified experts with proven experience. The bidder must propose, at a minimum, the following Key Expert positions:</p>\n\n<p><strong>Key Expert 1: Team Leader / Project Manager</strong></p>\n\n<p><strong>Key Expert 2: Business Analyst Expert</strong></p>\n\n<p><strong>Key Expert 3: Developer/Digital Transformation Architect</strong></p>\n\n<p>Bidders may propose additional non-key experts as they see fit to successfully deliver the scope of work.</p>\n\n<p>Required Qualifications</p>\n\n<p>All experts must be fluent in English and Arabic (written and spoken). The minimum required qualifications for the Key Experts are as follows:</p>\n\n<p><strong>Key Expert 1: Team Leader / Project Manager</strong></p>\n\n<ul>\n\t<li>Education: Master&rsquo;s degree in public administration, Business Administration, Project Management, or a related field.</li>\n\t<li>Professional Certification: PMP, PRINCE2, or Agile/Scrum Master certification is mandatory.</li>\n\t<li>General Experience: Minimum 10 years of professional experience in managing complex, large-scale reform or transformation projects.</li>\n\t<li>Specific Experience: Minimum 5 leading digital transformation, business process re-engineering, or public sector modernization projects.</li>\n\t<li>Proven track record in managing rapid-cycle or pilot projects with tight deadlines.</li>\n\t<li>Experience in the MENA region or Lebanon is highly desirable.</li>\n\t<li>Experience developing and delivering training programs for public sector employees undergoing digital transformation.</li>\n</ul>\n\n<p><strong>Key Expert 2: Senior Business Process Re-engineering (BPR) Expert</strong></p>\n\n<ul>\n\t<li>Education: Bachelor&rsquo;s degree in industrial, Business Administration, Information Technology, or a related field.</li>\n\t<li>Professional Certification: Lean Six Sigma, or a similar process improvement methodology is highly desirable.</li>\n\t<li>General Experience: Minimum 7 years of experience in business analysis, operations management or management consulting, business process analysis, and process re-engineering.</li>\n\t<li>Specific Experience: minimum 5 years of specific experience in process mapping (&quot;as-is&quot;) and redesigning (&quot;to-be&quot;) public services or sector services. Experience with service-oriented methodologies and process optimization.</li>\n\t<li>Must have experience in &quot;Digital Service Design<strong>&quot;, </strong>translating business processes into functional requirements or user stories for software developers.</li>\n\t<li>Proven experience in developing Standard Operating Procedures (SOPs) and User Manuals.</li>\n\t<li>Fluency in Arabic is mandatory for reviewing existing laws, forms, and administrative circulars.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Key Expert 3: Senior Digital Solution Architect </strong></p>\n\n<ul>\n\t<li>Education: bachelor&rsquo;s or master&rsquo;s degree in computer science, software engineering, Information Technology, or a related field.</li>\n\t<li>General Experience: Minimum of 8 years of professional experience in software development, systems, architecture, and web technologies.</li>\n\t<li>Specific Experience: Minimum 5 years of experience in designing and deploying e-government services or digital workflows, including secure electronic approvals or signature-enabled processes.</li>\n\t<li>Proven Experience with API integration and interoperability standards.</li>\n\t<li>Experience with rapid application development tools, low-code platforms, or form builders is highly desirable.</li>\n</ul>\n\n<ul>\n\t<li>Solid Knowledge of cybersecurity standards, and data protection protocols.</li>\n</ul>\n\n<ol>\n\t<li>Reporting Requirements</li>\n</ol>\n\n<p>The Consultant&rsquo;s reporting obligations are divided into two distinct categories: Contractual Deliverables and Administrative Progress Reports.</p>\n\n<p><strong>11.1 Contractual Deliverables (Payment Milestones)</strong></p>\n\n<p>These outputs are directly linked to the payment schedule defined in the Deliverables Table (Section 6). Payments will only be released upon formal written acceptance of these specific documents by the TC.</p>\n\n<ul>\n\t<li>D1: Inception Report and Agile Roadmap: Finalizes the work plan, methodology, and scope.</li>\n\t<li>D2: Summary Report on the Initial Data Collection Exercise and Consultations.</li>\n\t<li>D3&ndash;D5: Sprint Wave Reports: Documentation of technical deployment on the National Portal, including BRDs and FSDs.</li>\n\t<li>D6: Final Report: Capturing lessons learned and scale-up recommendations.</li>\n</ul>\n\n<p><strong>11.2 Administrative Progress Reporting (Monitoring Only)</strong></p>\n\n<p>These reports are for performance monitoring and coordination purposes.</p>\n\n<ul>\n\t<li>Monthly Progress Reports: The Consultant shall submit concise monthly reports detailing activities completed, progress against the agile timeline, and planned activities.</li>\n\t<li>Bi-Weekly Progress Meetings: The Consultant&rsquo;s team will participate in bi-weekly meetings with the project team to present findings and status updates.</li>\n</ul>\n\n<p><strong>11.3 Enforcement of Reporting Compliance</strong></p>\n\n<p>Timely submission of Administrative Progress Reports (as defined in Section 11.2) is a material obligation of the Consultant and considered an integral part of the deliverables and related acceptance.</p>\n\n<ol>\n\t<li>OMSAR and OMSTAI Inputs</li>\n</ol>\n\n<p>To facilitate the successful execution of the assignment, OMSAR and OMSTAI shall provide the following:</p>\n\n<ul>\n\t<li>Data and Documentation: Access to all relevant background documents, including existing service catalogs, process maps, and any data collected in earlier phases.</li>\n\t<li>Access to Stakeholders: Facilitation of and access to relevant stakeholders for interviews, workshops, and validation sessions, including staff in participating ministries, oversight bodies, and SOEs.</li>\n\t<li>Technical Committee (TC): Designation of members from OMSAR and OMSTAI and participating entities where applicable, to provide guidance, support integration, and ensure day-to-day collaboration.</li>\n\t<li>Timely Feedback: Provision of timely and consolidated feedback on all draft deliverables submitted by the consultant.</li>\n</ul>\n\n<ol>\n\t<li>Environmental and Social Considerations</li>\n</ol>\n\n<p>The Firm shall integrate environmental and social principles consistent with the World Bank Environmental and Social Framework (ESF) throughout the redesign and development of e-services. All work must ensure:</p>\n\n<ul>\n\t<li>Inclusive and accessible service design, compliant with recognized accessibility standards (e.g., WCAG 2.1 AA), and responsive to the needs of persons with disabilities and digitally vulnerable groups.</li>\n\t<li>Privacy-by-design and cybersecurity-by-design, ensuring secure handling of any information used during service diagnostics, prototyping, or pilot testing.</li>\n\t<li>Non-discriminatory service access, with redesign decisions avoiding barriers related to gender, language, or socioeconomic status.</li>\n\t<li>Basic environmental good practice in managing ICT resources, including minimizing unnecessary hardware use and ensuring responsible handling or disposal of any digital equipment used in testing.</li>\n</ul>\n\n<p>These considerations should be reflected in service workflows, user experience recommendations, prototypes, and final technical outputs.</p>"},{"id":"OP00435041","notice_type":"General Procurement Notice","noticedate":"30-Mar-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Sri Lanka","project_id":"P508317","project_name":"Sri Lanka Digital Transformation","contact_address":"490 R. A. De Mel Mawatha, \nColombo 00300","contact_ctry_name":"Sri Lanka","contact_email":"chamindas@govtech.lk","contact_name":"Chaminda  Samarathunga","contact_organization":"GovTech Sri Lanka (Pvt) Ltd","contact_phone_no":"+94112369099","contact_web_url":"https://govtech.lk","submission_date":"2026-03-30T00:00:00Z","notice_text":"<p><strong>THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA</strong></p>\n\n<p><strong>Ministry of Digital Economy</strong></p>\n\n<p><strong>GovTech Sri Lanka (Private) Limited</strong></p>\n\n<p><strong>General Procurement Notice</strong></p>\n\n<p>Project Name: <strong>Sri Lanka Digital Transformation</strong></p>\n\n<p>Practice area / sector: <strong>Digital Development</strong></p>\n\n<p>Credit No. &nbsp;<strong>IDA-79530-001</strong></p>\n\n<p>Project ID No. <strong>P508317</strong></p>\n\n<p>The <strong>Democratic Socialist Republic of Sri Lanka</strong> has received financing in the amount of <strong>US$ 50 million</strong> equivalent from the World Bank toward the cost of the <strong>Sri Lanka Digital Transformation project</strong>, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project.</p>\n\n<p><strong>The project will include the following components: &nbsp;</strong></p>\n\n<p><strong><u>Component 1: Digital Government and Services</u></strong>: will invest in cross-cutting digital platforms and systems to enhance service delivery and government efficiency, promote broad-based digital adoption among citizens and public officials, and support the operationalization of empowered digital institutions. Under this component, procurements are expected to center on information systems, goods, consulting, and non-consulting services to develop and/or deploy: an online citizen and business service portal and associated mobile application (SuperApp) and digital solutions to maximize the functionality of the service portal and mobile application, including digital locker, digital authentication, and electronic signature solutions; a National Data Exchange (NDX) to serve as the technical backbone of government interoperability; government-wide collaboration and communication tools to provide a unified digital workspace for public officials across government ministries and agencies; a secure and scalable government hybrid cloud solution (GovCloud); capacity building for government digital champions to support digital transformation efforts across government entities; digital literacy trainings, citizen service desks, and information, communications, and education campaign to promote universal access to digital services; policy and operationalization support for GovTech Sri Lanka and other digital institutions. &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p>\n\n<p><strong><u>Component 2: Digital Startup Ecosystem and IT Industry Development</u></strong><u>:</u> will support both emerging digital startups and more established, midsize IT firms to expand into new international markets and attract new customers and investments. Under this component, procurements are expected to center on consulting, and non-consulting services to: develop a comprehensive IT industry development strategy for Sri Lanka; deliver a startup acceleration and ecosystem-building program, including targeted support for women-led startups; and to provide market access support for mid-sized IT services and technology firms, through targeted export promotion initiatives and capacity building.</p>\n\n<p><strong><u>Component 3: Project Management, Monitoring, and Coordination</u></strong><u>:</u> will finance project management and coordination, including procurement, financial management (FM), monitoring and evaluation (M&amp;E), and environmental and social (E&amp;S) risk management aspects of the project.</p>\n\n<p>Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank&rsquo;s <strong><em>Procurement Regulations for IPF Borrowers - September 2025 (Procurement Regulations)</em></strong>, and is open to all eligible firms and individuals as defined in the <em>Procurement Regulations</em>. After project negotiations, the World Bank shall arrange the publication on its external website of the agreed initial procurement plan and all subsequent updates once it has provided a no objection.</p>\n\n<p>Specific procurement notices for contracts subject to open international competitive procurement will be announced, as they become available on the World Bank&rsquo;s external website and https://promise.lk/ and https://govtech.lk/ websites and &ldquo;Daily News&rdquo; and &ldquo;Sunday Observer&rdquo; newspapers.</p>\n\n<p>Interested eligible firms and individuals who would wish to be considered for the provision of goods, works, non-consulting services and consulting services for the above-mentioned project, or those requiring additional information, should contact the Borrower at the address below:</p>\n\n<p>Sanjaya Karunasena,</p>\n\n<p>Chief Executive Officer (Acting)</p>\n\n<p>GovTech Sri Lanka (Private) Limited,</p>\n\n<p>Third Floor, No. 490, R A De Mel Mawatha,</p>\n\n<p>Colombo 03, Sri Lanka.</p>\n\n<p>sanjayak@govtech.lk&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>https://govtech.lk/</p>\n\n<p>Tel: +94112369099</p>\n\n<p>Date: March 27, 2026</p>\n\n<p>&nbsp;</p>"}]}