{"rows":20,"os":"0","page":"1","total":"48","procnotices":[{"id":"OP00430647","notice_type":"Invitation for Prequalification","noticedate":"09-Apr-2026","notice_lang_name":"French","notice_status":"Published","submission_deadline_date":"2026-05-06T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Western and Central Africa","project_id":"P167798","project_name":"Cameroon-Chad Transport Corridor","bid_reference_no":"CM-MINT-525560-GO-RFP","bid_description":"Conception, développement et mise en place d’un Système d’Informations National de Données sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride à Haute Disponibilité","procurement_group":"GO","procurement_method_code":"RFP","procurement_method_name":"Request for Proposals","contact_address":"CAB/ MINT (+237) 222 22 87 29 (+237)222 23 23 65","contact_ctry_name":"Cameroon","contact_email":"claudentone@yahoo.fr","contact_name":"CLAUDE MISSE NTONE","contact_organization":"Ministry of Transport","contact_phone_no":"698209952","contact_web_url":"https://mintransports.net/en/","submission_date":"2026-04-09T00:00:00Z","notice_text":"<p><strong>Avis de selection initiale N&deg;001/ASI/MINT/ PCDN/UGP/2026/</strong></p>\n\n<p><strong>du 07 Avril 2026 relatif &agrave; la conception, le d&eacute;veloppement et la mise en place d&rsquo;un syst&egrave;me d&rsquo;information national de donn&eacute;es sur les accidents de la route (SINDAR) au Cameroun, incluant une infrastructure serveur central cloud hybride &agrave; haute disponibilit&eacute;</strong></p>\n\n<ol>\n\t<li>Le Gouvernement du Cameroun a re&ccedil;u un financement de la Banque mondiale pour le co&ucirc;t du Projet r&eacute;gional pour l&rsquo;am&eacute;lioration de la performance du Corridor rail/route Douala-N&rsquo;djam&eacute;na, et a l&rsquo;intention d&rsquo;appliquer une partie du produit aux paiements en vertu du march&eacute; pour&nbsp; la conception, du d&eacute;veloppement et de la mise en place d&rsquo;un Syst&egrave;me d&rsquo;Informations National de Donn&eacute;es sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride &agrave; Haute Disponibilit&eacute;.</li>\n\t<li>Le Coordonnateur du PCDN a l&rsquo;intention de s&eacute;lectionner initialement les Candidats &nbsp;pour &nbsp;la <strong>conception, le d&eacute;veloppement et la mise en place d&rsquo;un Syst&egrave;me d&rsquo;Informations National de Donn&eacute;es sur les Accidents de la Route au Cameroun, incluant une Infrastructure Serveur Centrale Cloud Hybride &agrave; Haute Disponibilit&eacute;</strong>, y compris la proposition d&#39;un ensemble harmonis&eacute; d&#39;&eacute;l&eacute;ments de donn&eacute;es (Data Elements), l&rsquo;&eacute;laboration d&rsquo;un dictionnaire de donn&eacute;es d&eacute;taill&eacute;es, la d&eacute;finition des normes de qualit&eacute; des donn&eacute;es, la sp&eacute;cification des indicateurs de performance cl&eacute;s (KPIs) tels que taux de mortalit&eacute;, taux de blessures graves, types d&#39;accidents pr&eacute;dominants, efficacit&eacute; des interventions, l&rsquo;int&eacute;gration et la gestion des Donn&eacute;es, les analyses avanc&eacute;es, le reporting et la diffusion, l&rsquo;acquisition et le param&eacute;trage des logiciels, l&rsquo;int&eacute;gration des syst&egrave;mes, la migration des donn&eacute;es existantes, les tests complets, la formation, la mise en service, l&rsquo;accompagnement et la p&eacute;rennisation du syst&egrave;me.<strong> </strong>On s&rsquo;attend &agrave; ce que la Demande de Propositions soit &eacute;mise en juin 2026.</li>\n\t<li>La S&eacute;lection Initiale sera effectu&eacute;e selon les proc&eacute;dures sp&eacute;cifi&eacute;es dans le R&egrave;glement de Passation des March&eacute;s &nbsp;de la Banque mondiale pour les Emprunteurs de FPI, septi&egrave;me &eacute;dition, septembre 2025 &laquo; R&egrave;glement de Passation des March&eacute;s &raquo;), et est ouverte &agrave; tous les Candidats &eacute;ligibles tels que d&eacute;finis dans le R&egrave;glement de Passation des march&eacute;s.</li>\n\t<li>Les Candidats &eacute;ligibles int&eacute;ress&eacute;s peuvent obtenir de plus amples informations aupr&egrave;s de l&rsquo;Unit&eacute; de gestion du Projet r&eacute;gional pour l&rsquo;am&eacute;lioration de la performance du Corridor rail/route Douala-N&rsquo;djam&eacute;na &agrave; l&rsquo;adresse ci-dessous pendant les heures de bureau de 9 heures &agrave; 16 heures.</li>\n</ol>\n\n<p>Un ensemble complet du dossier de <strong>S&eacute;lection Initiale</strong> <strong>en fran&ccedil;ais</strong> peut &ecirc;tre obtenu par les Candidats int&eacute;ress&eacute;s &agrave; l&rsquo;adresse ci-dessous sur pr&eacute;sentation de l&rsquo;original de la quittance de versement de la somme non remboursable de trois cents (300) mille Francs CFA repr&eacute;sentant les frais d&rsquo;acquisition du dossier sur le compte n&deg;335 988 ouvert aupr&egrave;s des 12 agences BICEC ci-apr&egrave;s au nom de &laquo;&nbsp;Compte Sp&eacute;cial CAS ARMP&nbsp;&raquo;<em>.</em> Le dossier sera envoy&eacute; par courrier aux entreprises dont le si&egrave;ge social est bas&eacute; hors du Cameroun.</p>\n\n<p>5.Les candidatures de S&eacute;lection Initiale doivent &ecirc;tre soumises en quatre (04) exemplaires dont un (01) original et trois (03) copies marqu&eacute;es comme tels, et accompagn&eacute;es de la version scann&eacute;e de l&rsquo;original de la candidature d&eacute;pos&eacute;e (sign&eacute;e et cachet&eacute;e) sur cl&eacute; USB, dans des enveloppes clairement marqu&eacute;es &agrave; l&rsquo;adresse ci-dessous au plus tard &agrave; <strong>14 heures, heure locale</strong><em> </em>le <strong>06 mai 2026</strong>.</p>\n\n<p>Les candidatures peuvent &eacute;galement &ecirc;tre soumises par voie &eacute;lectronique sur le site COLEPS &agrave; l&rsquo;adresse www.marchespublics.cm. Une copie de sauvegarde de l&rsquo;offre enregistr&eacute;e sur cl&eacute; USB devra &ecirc;tre transmise sous plis scell&eacute; avec l&rsquo;indication claire et lisible &laquo;&nbsp;COPIE DE SAUVEGARDE&nbsp;&raquo; dans les d&eacute;lais impartis.</p>\n\n<p><strong>Les demandes tardives seront rejet&eacute;es.</strong></p>\n\n<p>Les enveloppes ferm&eacute;es devront comprendre la mention suivante&nbsp;:</p>\n\n<p><strong><em>&laquo;&nbsp;AVIS DE SELECTION INITIALE N&deg;001/ASI/MINT/PCDN/UGP/2026 DU 07 AVRIL 2026 RELATIF&Agrave; LA CONCEPTION, LE D&Eacute;VELOPPEMENT ET LA MISE EN PLACE D&rsquo;UN SYST&Egrave;ME D&rsquo;INFORMATION NATIONAL DE DONN&Eacute;ES SUR LES ACCIDENTS DE LA ROUTE (SINDAR) AU CAMEROUN, INCLUANT UNE INFRASTRUCTURE SERVEUR CENTRAL CLOUD HYBRIDE &Agrave; HAUTE DISPONIBILIT&Eacute; &raquo;</em></strong></p>\n\n<p><strong><em>&laquo;&nbsp;A N&rsquo;OUVRIR QU&rsquo;EN SEANCE DE DEPOUILLEMENT&nbsp;&raquo;.</em></strong></p>\n\n<p>L&rsquo;adresse &agrave; laquelle il est fait r&eacute;f&eacute;rence ci-dessus est&nbsp;:</p>\n\n<p><strong>Unit&eacute; de Gestion du PCDN</strong></p>\n\n<p><strong>Bastos, derri&egrave;re l&rsquo;H&ocirc;tel le Diplomate, Rue 1.904</strong></p>\n\n<p><strong>Email&nbsp;: </strong><strong>claudentone@yahoo.fr</strong><strong> avec copie &agrave; </strong><strong>mnnjeck@gmail.com</strong><strong> </strong><strong>et</strong><strong> </strong><strong>cteignegou@yahoo.fr</strong>.</p>"},{"id":"OP00432358","notice_type":"Request for Expression of Interest","noticedate":"12-Mar-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-03-27T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Liberia","project_id":"P171997","project_name":"Liberia Investment, Finance and Trade Project","bid_reference_no":"LR-MOCI-538872-CS-QCBS","bid_description":"Firm to Automate the Environmental and Social Impact Assessment (ESIA) Process of the Environmental Protection Agency of Liberia.","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Ministerial Complex\nCongo Town\nTubman Blvd, Monrovia,","contact_ctry_name":"Liberia","contact_email":"edwingbaie1978@gmail.com","contact_name":"Edwin J.  Gbaie, Sr.","contact_organization":"Ministry of Commerce and Industry","contact_phone_no":"0886462576","submission_date":"2026-03-12T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; REPUBLIC OF LIBERIA<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;MINISTRY OF COMMERCE &amp; INDUSTRY (MoCI)</strong><br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Liberia Investment, Finance &amp; Trade Project (LIFT-P)<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;INSURANCE BUILDING, 5TH STREET-SINKOR, OPPOSITE CONEX GAS STATIO<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;MONROVIA, LIBERIA<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;P.O. Box 9041, 1000 Monrovia, 10 Liberia<br />\n&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;Email: info-lift@moci.gov.lr /www.moci.gov.lr</p>\n\n<p><strong>REQUEST FOR EXPRESSION OF INTEREST (REOI)</strong><br />\n<strong>(CONSULTING SERVICES &ndash; FIRM SELECTION)</strong></p>\n\n<p>Liberia Investment, Finance and Trade Project (LIFT-P)<br />\nProject ID: P171997<br />\nCredit Number 7037-LR<br />\nGrant Number D9690-LR</p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; March 13, 2026</strong></p>\n\n<p><strong>Firm to Automate the Environmental and Social Impact Assessment (ESIA) Process of the Environmental Protection Agency of Liberia, LR-MOCI-538872-CS-QCBS</strong></p>\n\n<p>The Government of Liberia, through the Ministry of Commerce and Industry (MoCI) is implementing the Liberia Investment, Finance and Trade (LIFT) Project (P171997) with financing from the International Development Association (IDA) of the World Bank Group ($40 million). This project was developed to support the government&rsquo;s strategic objectives to promote private sector development. Accordingly, the project development objective is to improve the investment&nbsp;climate, expand sustainable&nbsp;access to finance, and increase the efficiency of trade in Liberia. Achieving this objective requires support for improving SME&rsquo;s capabilities for accessing finance and new market opportunities, to contribute to economic growth, competitiveness, and job creation. The project implementation is being coordinated by the Project Implementation Unit, under a Project Steering Committee chaired by the Minister of Commerce and Industry of the Republic of Liberia, and co-chaired by the Governor of the Central Bank of Liberia (CBL).</p>\n\n<p><strong>Key Objectives of the Assignment &nbsp;</strong></p>\n\n<p>The objective of this consultancy is to design, develop, and deploy a secured, integrated, scalable, and user-friendly digital ESIA platform within six months. This platform is intended to enable the EPA to manage all stages of its ESIA permitting and other internal licensing processes, from licensing application and document submissions to evaluation, approval, and license issuance. The platform design shall aid monitoring and compliance tracking, ensuring alignment with legal obligations and user accessibility. The platform shall enable SMEs and the general investment community to register and manage profiles, seamlessly obtain ESIA documents and information, connect with the EPA, and promote transparency, effectiveness, and data security.</p>\n\n<p><strong>Scope of the Assignment</strong></p>\n\n<p>The firm will be responsible for developing a centralized, user-friendly platform as described in the objective above. To ensure responsiveness to user needs and alignment with project objectives, the firm will apply an agile development approach, incorporating iterative testing and stakeholder feedback at every stage of the development cycle.</p>\n\n<p>The scope of the consultancy includes:</p>\n\n<ol>\n\t<li>Reviewing of the EPA&rsquo;s existing ESIA procedural guideline and processes, the recent consultancy report commissioned under the project to assess the ESIA licensing framework of the EPA, and any other related EPA regulatory documents.</li>\n\t<li>Conducting best practice research, including stakeholder consultations, and design or engineer a system to align with objectives focused on seamless process flow and minimizing the time needed for obtaining ESIA permits and licenses.</li>\n\t<li>Developing a contemporary, functional hybrid (online and offline) platform that showcases an understanding of the ESIA requirements and processes, enables seamless communication and linkages between the EPA and project proponents, and facilitating the management of ESIA permitting and licensing processes. The system should facilitate future integration with other government departments and enable the integration of other useful and relevant government institutions.</li>\n\t<li>Installing the prerequisite hardware and software, which includes servers, storage systems, backup and recovery systems, and firewall systems, to secure the system and its environment.</li>\n\t<li>Completing technical and end-user documentation for system use and maintenance. All source code and configuration files must be handed over to EPA&rsquo;s IT Unit upon completion of the consultancy.</li>\n\t<li>Providing training to all user groups, including system administrators, EPA&#39;s ESIA and ICT Units, ESIA-licensed consultants, and project proponents, including SMEs.</li>\n\t<li>Undertaking post-launch support and maintenance for a minimum of six months.</li>\n</ol>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment can found at the link below: </strong>hppt //: www.moci.gov.lr&nbsp; / www.emansion.gov.lr&nbsp;</p>\n\n<p>The Ministry of Commerce and Industry now invites eligible Consulting Firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Individual Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are listed as per the Terms of Reference provided below. The Consultant should have minimum qualifications and experience as follows:</p>\n\n<p>The Ministry of Commerce and Industry now invites eligible Consulting Firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are listed as per the Terms of Reference provided below.</p>\n\n<p>The Consulting Firm should have minimum qualifications and experience as follows:</p>\n\n<ol>\n\t<li>Demonstrable experience designing and implementing online web applications for clients in the public or private sector, including government agencies, MSMEs, or development projects, and partners</li>\n\t<li>Demonstrable experience using Agile or Scrum methodologies in web application development will be considered an asset.</li>\n\t<li>Demonstrate compliance with ISO 27001(mandatory) and ISO 20000 standards. If the firm does not have an ISO 20000, then reference letters&nbsp;from at least two government clients or international institutions, or Third-party audit reports&nbsp;or independent assessments, or system performance and service delivery reports confirming successful delivery and operational support of national-scale digital systems, such as an ESIA system, must be submitted.</li>\n</ol>\n\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Key Experts will not be evaluated at the shortlisting stage.</strong></p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers dated July 2016, Revised November 2017, August 2018, November 2020, September 2023, February 2025 and September 2025 &nbsp;(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>The Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations for IPF Borrowers (July 2016 as Revised in November 2017, August 2018, November 2020, September 2023, February 2025 and September 2025).</p>\n\n<p>Further information can be obtained at the address below during office hours, i.e., 0900 to 1600 hours GMT, Monday to Friday.</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (only by email) on or before <strong>Friday March 27, 2026, </strong>with subject: <strong>&ldquo; Firm to Automate the Environmental and Social Impact Assessment (ESIA) Process of the Environmental Protection Agency of Liberia, LR-MOCI-538872-CS-QCBS&rdquo;.</strong></p>\n\n<p>Liberia Investment, Finance and Trade Project (LIFT-P)<br />\nAttn: Julius Y. Saye Keh-nel &nbsp;<br />\nActing Project Coordinator<br />\nInsurance Building, 5th Street, Sinkor &nbsp;<br />\nMonrovia, Liberia<br />\nTel: +231 88 682 2025 /776 654 713<br />\nEmail: <em>jsayekehnel-lift@moci.gov.lr</em><br />\nCc: <em>/</em><em>vanyanbah.julius@yahoo.com</em> /<em>fahnco76@yahoo.com</em>&nbsp;</p>\n\n<p><strong>Terms of Reference </strong></p>\n\n<p>Hiring of a Firm to Automate the Environmental and Social Impact Assessment (ESIA) Process of the Environmental Protection Agency of Liberia</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Post Title:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:468px\">\n\t\t\t<p>Consultancy to Automate the Environmental and Social Impact Assessment (ESIA) Process of the Environmental Protection Agency of Liberia</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:none; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Location of Post:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:none; vertical-align:top; width:468px\">\n\t\t\t<p>Headquarters of the Environmental Protection Agency, Sekou Tour&eacute; Avenue, Monrovia, Liberia</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Contract Duration:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:468px\">\n\t\t\t<p>6 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Reporting Line:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:468px\">\n\t\t\t<p>Executive Director of the EPA</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Recruitment Type:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:none; border-left:none; border-right:none; border-top:none; vertical-align:top; width:468px\">\n\t\t\t<p>Open International</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:186px\">\n\t\t\t<p><strong>Type of Contract</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid #7f7f7f; border-left:none; border-right:none; border-top:1px solid #7f7f7f; vertical-align:top; width:468px\">\n\t\t\t<p>Firm Selection</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Background and General Description</strong></p>\n\n<p>The Government of Liberia, through the Ministry of Commerce and Industry (MoCI) is implementing the Liberia Investment, Finance and Trade (LIFT) Project (P171997) with financing from the International Development Association (IDA) of the World Bank Group ($40 million). This project was developed to support the government&rsquo;s strategic objectives to promote private sector development. Accordingly, the project development objective is to improve the investment&nbsp;climate, expand sustainable&nbsp;access to finance, and increase the efficiency of trade in Liberia. Achieving this objective requires support for improving SME&rsquo;s capabilities for accessing finance and new market opportunities, to contribute to economic growth, competitiveness, and job creation. The project implementation is being coordinated by the Project Implementation Unit, under a Project Steering Committee chaired by the Minister of Commerce and Industry of the Republic of Liberia, and co-chaired by the Governor of the Central Bank of Liberia (CBL).</p>\n\n<p>Component one of this project supports improvements in Liberia&rsquo;s business environment by strengthening critical Government to Business (G2B) services covering international trade, business licensing, and private investment. This component builds on and complements the extensive advisory work that has been carried out in recent years by IFC and others, and which will continue through the initial implementation stages of the project.</p>\n\n<p>Accordingly, Sub-component 1.1 seeks to provide Technical Assistance to selected government Ministries, Agencies, and Commissions (MACs), including the EPA, to enable Liberia to attract and retain large private sector investments and ensure its impact.<strong> </strong>Resources are focused on technical assistance needed to prepare large investments and institutional or regulatory support that will be geared towards consolidating and reinforcing what is today a weak and fragmented institutional setup in support of private sector investment.</p>\n\n<p>Through the Project, the EPA is implementing transformative and innovative initiatives to fulfill its mandate and respond to the growing demands of the public. One of the critical reform areas is the modernization of the Environmental and Social Impact Assessment (ESIA) licensing regime, particularly to improve access and service delivery to all sectors. A recent consultancy report commissioned under the project assessed the ESIA licensing framework of the EPA and identified major procedural bottlenecks, a lack of digital infrastructure, and limited SME access to permitting services. Among the key recommendations was the need to automate and digitalize the ESIA licensing system to reduce delays, increase accountability, and improve service delivery.</p>\n\n<p>In line with this recommendation, and in accordance with the project&rsquo;s PDOs and the EPA&rsquo;s strategic plan, the EPA aims to recruit a qualified consulting firm or consortium through the LIFT project to develop the digital infrastructure for the ESIA process automation in Liberia.</p>\n\n<p><strong>Objective of the Assignment </strong></p>\n\n<p>The objective of this consultancy is to design, develop, and deploy a secured, integrated, scalable, and user-friendly digital ESIA platform within six months. This platform is intended to enable the EPA to manage all stages of its ESIA permitting and other internal licensing processes, from licensing application and document submissions to evaluation, approval, and license issuance. The platform design shall aid monitoring and compliance tracking, ensuring alignment with legal obligations and user accessibility. The platform shall enable SMEs and the general investment community to register and manage profiles, seamlessly obtain ESIA documents and information, connect with the EPA, and promote transparency, effectiveness, and data security.</p>\n\n<p><strong>Scope of the consultancy </strong></p>\n\n<p>The firm will be responsible for developing a centralized, user-friendly platform as described in the objective above. To ensure responsiveness to user needs and alignment with project objectives, the firm will apply an agile development approach, incorporating iterative testing and stakeholder feedback at every stage of the development cycle.</p>\n\n<p>The scope of the consultancy includes:</p>\n\n<ol>\n\t<li>Reviewing of the EPA&rsquo;s existing ESIA procedural guideline and processes, the recent consultancy report commissioned under the project to assess the ESIA licensing framework of the EPA, and any other related EPA regulatory documents.</li>\n\t<li>Conducting best practice research, including stakeholder consultations, and design or engineer a system to align with objectives focused on seamless process flow and minimizing the time needed for obtaining ESIA permits and licenses.</li>\n\t<li>Developing a contemporary, functional hybrid (online and offline) platform that showcases an understanding of the ESIA requirements and processes, enables seamless communication and linkages between the EPA and project proponents, and facilitating the management of ESIA permitting and licensing processes. The system should facilitate future integration with other government departments and enable the integration of other useful and relevant government institutions.</li>\n\t<li>Installing the prerequisite hardware and software, which includes servers, storage systems, backup and recovery systems, and firewall systems, to secure the system and its environment.</li>\n\t<li>Completing technical and end-user documentation for system use and maintenance. All source code and configuration files must be handed over to EPA&rsquo;s IT Unit upon completion of the consultancy.</li>\n\t<li>Providing training to all user groups, including system administrators, EPA&#39;s ESIA and ICT Units, ESIA-licensed consultants, and project proponents, including SMEs.</li>\n\t<li>Undertaking post-launch support and maintenance for a minimum of six months.</li>\n</ol>\n\n<p><strong>Functional Requirement </strong></p>\n\n<p>Below are some of the recommended functional requirements for the platform, but are not limited to and would be updated with additional functionality or features based on the firm&rsquo;s research and stakeholder consultation.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Public Interface and features: </strong></li>\n\t</ol>\n\t</li>\n\t<li>Information relating to the EPA, the ESIA licensing process, including requirements, procedures/steps, and processes</li>\n\t<li>Statistical summary (number of licensed proponents, licensed consultants, etc)</li>\n\t<li>List of licensed local and international consultants and their profiles, list of sectors and activities requiring permits, categories of permits and proponents, etc (Searching and Filtering list)</li>\n\t<li>Registration (Proponents and consultants)</li>\n\t<li>Complaint box or contact</li>\n\t<li>Testimonial</li>\n\t<li>Email and phone validation and verification, including multi-factor authentication (MFA) and options for future integration with Liberia&rsquo;s digital ID system. &nbsp;</li>\n\t<li>Account creation</li>\n\t<li>Online submissions and uploading of supporting documents. The preferred format for supporting documents is PDF.</li>\n\t<li>Acceptable attachment size requirement of supporting documents.</li>\n\t<li>Categories of activities or undertakings</li>\n\t<li>Types or description of undertaking</li>\n\t<li>Automatic application number</li>\n\t<li>Automatic permit number generation</li>\n\t<li>Data security, including minimum security protocols (TLS 1.2+, OWASP Top 10), data encryption, a granular access control mechanism, and vulnerability management processes. The system should provide an avenue for penetration testing and other security assessments.</li>\n\t<li>Support virus scanning for uploaded documents, and be able to set a maximum file size and allow chunked upload for large documents.</li>\n\t<li>Electronic signing of documents</li>\n\t<li>Alert notification</li>\n\t<li>Advanced search and filter</li>\n\t<li>Online application and registration form</li>\n\t<li>Audit log for changes and modifications</li>\n\t<li>Applicant&rsquo;s capacity to save draft filings and resume or continue based on previously saved drafts</li>\n\t<li>Standard field checks</li>\n\t<li>User Consent and Acknowledgement of Terms and Conditions</li>\n\t<li>The platform must be used and accessible with or without internet access.</li>\n</ol>\n\n<ol>\n\t<li><strong>Portals: </strong></li>\n\t<li>Administrator login</li>\n\t<li>Proponent login</li>\n\t<li>FirmLogin</li>\n\t<li>Back-office portal for EPA Staff</li>\n</ol>\n\n<ol>\n\t<li><strong>Administrator &amp; Back Office Accounts</strong></li>\n</ol>\n\n<p>The features may be updated based on the firm&rsquo;s research and stakeholder consultation.</p>\n\n<ol>\n\t<li>Account holder information (name, position, etc)</li>\n\t<li>Receive, review, and process applications</li>\n\t<li>Account levels or rights (processor, reviewer, approval, etc). This should be fully configurable and support granular permissions and least-privileged access to minimize risk.</li>\n\t<li>User satisfaction survey request and access to results</li>\n\t<li>User account &amp; permission management (creation and approval of new accounts)</li>\n\t<li>M&amp;E tool for tracking application, selection, evaluations, and issuance</li>\n\t<li>Statistical report generation. Dashboard and downloadable reports in CSV/Excel with role-based visibility. &nbsp;</li>\n\t<li>Monitoring linkages of proponents to one or more consultants</li>\n\t<li>Notifications (progress, license expiration, etc)</li>\n\t<li>Generates an automatic application number</li>\n\t<li>Information update with versioning inclusion to track data changes over time.</li>\n</ol>\n\n<p><strong>Consultants Account</strong></p>\n\n<p>The features may be updated based on the consultant&rsquo;s research and stakeholder consultation.</p>\n\n<ol>\n\t<li>Profile management</li>\n\t<li>Link with proponents</li>\n\t<li>Make application</li>\n\t<li>Submit ESIA documents</li>\n\t<li>Monitor and track the application &nbsp;</li>\n\t<li>Information update</li>\n</ol>\n\n<p><strong>Proponents Account</strong></p>\n\n<p>The features may be updated based on the consultant&rsquo;s research and stakeholder consultation.</p>\n\n<ol>\n\t<li>Profile management</li>\n\t<li>Link with proponents</li>\n\t<li>Make application</li>\n\t<li>Monitor application &nbsp;</li>\n\t<li>Make payment</li>\n\t<li>Received downloadable permits</li>\n\t<li>Track application</li>\n\t<li>Information update</li>\n</ol>\n\n<p><strong>Product Environment and Hosting </strong></p>\n\n<p>The firm will provide a list of the best tools, language(s), frameworks, technologies, and configurations to develop, test, and deploy the platform. The hosting, domain name, and SSL certification will be provided. The firm shall be responsible for configuring and deploying a testing environment at the commencement of the consultancy, as well as a production environment, before the launch date.</p>\n\n<p><strong>Deliverables and Timetable</strong></p>\n\n<p>The firm will be responsible for submitting the following deliverables:</p>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:58px\">\n\t\t\t<p><strong>Task</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Deliverables</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:147px\">\n\t\t\t<p><strong>Time(duration)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:120px\">\n\t\t\t<p><strong>Payment </strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:58px\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Inception report</strong> highlighting the firm understanding of the consultancy along with updated action plan that outlines the main deliverables, methodologies, activities, timetable, workflow and proposed system detail and development lifecycle (SDLC).</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:147px\">\n\t\t\t<p>Week 2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:58px\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Report of need assessment and stakeholder consultation</strong> conducted to understand tools requirements, database design, define data collection and entry elements, define data protection elements, test and validate the tool, and propose key factors and framework for to monitoring and evaluation of the tool.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:147px\">\n\t\t\t<p>Week 6</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; height:127px; vertical-align:top; width:58px\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:127px; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Installed prerequisite hardware and software,</strong> which includes servers, storage systems, backup and recovery systems, and firewall systems, to secure the system and its environment based on specifications agreed upon.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:127px; vertical-align:top; width:147px\">\n\t\t\t<p>Week 10</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; height:127px; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:58px\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Developed a fully functional online platform</strong> based on international best practices and meets the requirements and expectations of both the EPA, end users and the stakeholders. Also, launch the online tool, and define mechanisms to monitor and evaluate its usage. Ensure all testing (unit, integration, system, User Acceptance, etc) are fully performed and Quality Assurance, focused on preventing defects, are in place prior to official launch of the system to the public.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:147px\">\n\t\t\t<p>Week 14</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:58px\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:298px\">\n\t\t\t<p><strong>End-user documentation</strong> detailing the functionality and features available. Also provide training, showcasing the functionality and features of the platform to EPA Staff, proponents and consultants.</p>\n\n\t\t\t<p>Provide technical documentation and transfer all source code and configuration files to EPA&rsquo;s IT Unit. Additionally, deliver training to IT Unit to ensure familiarity with the system infrastructure and maintenance requirements. The end- user documentation should also include a detailed QA documentation including test plans, test cases, and test scripts for Unit, Integration, and System Testing, maintaining environment, running tests, logging and tracking defects and their resolution, and retesting fixes.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:147px\">\n\t\t\t<p>Week 15</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:58px\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:298px\">\n\t\t\t<p><strong>Six months of maintenance</strong> to address any issues or bugs following the platform&rsquo;s launch; no new feature development is required during this period. Post support will include hypercare and stabilization with focus on intensive, high-touch support, rapid response to all queries and issues, and standard support mode focusing on resolving logged tickets, minor enhancements, and knowledge transfer.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:147px\">\n\t\t\t<p>Week 22</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:120px\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Approach and Implementation Arrangements</strong></p>\n\n<p>The assignment will be executed by the selected firm, which will coordinate all the activities relating to the deliverables of the contract.&nbsp; The Project Implementation Unit, as the implementing body for the Liberia Investment, Finance and Trade Project, will play a key coordinating and leadership role in ensuring that the contractor delivers on the contract in a timely manner. The assignment will be delivered through an inclusive stakeholders&rsquo; participation and stakeholder-driven approach. The contractor will work closely with the PIU and the EPA.</p>\n\n<p><strong>Qualification and Experience</strong></p>\n\n<p>The consultancy firm bidding for the service must possess the following experience and competencies:</p>\n\n<ol>\n\t<li>Demonstrable experience designing and implementing online web applications for clients in the public or private sector, including government agencies, MSMEs, or development projects, and partners</li>\n\t<li>Demonstrable experience using Agile or Scrum methodologies in web application development will be considered an asset.</li>\n\t<li>Demonstrate compliance with ISO 27001(mandatory) and ISO 20000 standards. If the firm does not have an ISO 20000, then reference letters&nbsp;from at least two government clients or international institutions, or Third-party audit reports&nbsp;or independent assessments, or system performance and service delivery reports confirming successful delivery and operational support of national-scale digital systems, such as an ESIA system, must be submitted.</li>\n\t<li>The firm must have suitable qualified personnel (defined below) to fill the following minimum positions.</li>\n</ol>\n\n<table cellspacing=\"0\" style=\"border-collapse:collapse\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:39px\">\n\t\t\t<p><strong>S/N</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:122px\">\n\t\t\t<p><strong>Personnel </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:42px\">\n\t\t\t<p><strong>#</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:1px solid black; vertical-align:top; width:420px\">\n\t\t\t<p><strong>Qualification </strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:39px\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:122px\">\n\t\t\t<p>System Engineer (Team Lead)</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:420px\">\n\t\t\t<ol>\n\t\t\t\t<li>Bachelor&rsquo;s Degree in Software Development, Software Engineering, Information Technology or related field to Web Application Development is required.</li>\n\t\t\t\t<li>Master&rsquo;s Degree in Software Development, Software Engineering, Information Technology or related field to Web Application Development will be considered an asset.</li>\n\t\t\t\t<li>Relevant professional certifications related to online tool development (E.g. Certified Software Development Professional (CSDP), Certified Scrum Developer (CSD), Salesforce Certified Developer, SAP Certified Development Associate, Power Platform &amp; Power BI Certifications) is desirable.</li>\n\t\t\t\t<li>Minimum of five (5) years General Professional Experience in a field related to the consultancy</li>\n\t\t\t\t<li>At least six (6) years of experience in full-cycle web application development. This may include experience in one or more of the following areas: system analysis, backend development, and database design.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:39px\">\n\t\t\t<p>2.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:122px\">\n\t\t\t<p>Environmental and Social Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:420px\">\n\t\t\t<ol>\n\t\t\t\t<li>Advanced degree in Environmental Science, Sociology, Social Science, Natural Resource Management, Environmental Policy, Law, or a related field.</li>\n\t\t\t\t<li>Demonstrated experience in stakeholder engagement</li>\n\t\t\t\t<li>Must have a minimum of five (5) years of work experience in policy review, stakeholder engagement, and drafting and development of environmental regulations, guidelines, and standards;</li>\n\t\t\t\t<li>Must be knowledgeable of the ESIA process of Liberia;</li>\n\t\t\t\t<li>Excellent facilitation, writing, and communication skills.</li>\n\t\t\t\t<li>Excellent and practical research skills, communication (verbal and written) skills, including the ability to prepare reports and conduct presentations by clearly formulating positions on issues, articulating options concisely, conveying maximum necessary information, making and defending recommendations;</li>\n\t\t\t\t<li>Excellent computer skills, particularly with Microsoft Excel, Word, and PowerPoint or related packages;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:39px\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:122px\">\n\t\t\t<p>Quality Assurance Engineer/ Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:420px\">\n\t\t\t<ol>\n\t\t\t\t<li>Bachelor&rsquo;s Degree in Information Technology or related field is required.</li>\n\t\t\t\t<li>Master&rsquo;s Degree in Information Technology or related field will be considered an asset.</li>\n\t\t\t\t<li>Minimum of three (3) years General Professional Experience in a field related to the consultancy</li>\n\t\t\t\t<li>At least three (3) years of experience in multitier web application development with hands-on experience of Java, Python, dot net, CS, HTML/CSS, etc</li>\n\t\t\t\t<li>Strong organizational and quality assurance skills in system development</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:1px solid black; border-right:1px solid black; border-top:none; vertical-align:top; width:39px\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:122px\">\n\t\t\t<p>Support Staff</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:42px\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-bottom:1px solid black; border-left:none; border-right:1px solid black; border-top:none; vertical-align:top; width:420px\">\n\t\t\t<ol>\n\t\t\t\t<li>Bachelor&rsquo;s Degree in Human Resource Management, change management or related field is required.</li>\n\t\t\t\t<li>Minimum of three (3) years General Professional Experience in a field related to the consultancy</li>\n\t\t\t\t<li>At least three (3) years of experience in full-cycle web system change management and training. &nbsp;</li>\n\t\t\t\t<li>Good knowledge of database management&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Attach CVs of all proposed personnel, together with relevant certificates for all positions, is mandatory.</p>\n\n<p><strong>Duration of Consultancy</strong></p>\n\n<p>The consultancy duration is 6 months.</p>\n\n<p><strong>Reporting Arrangements</strong></p>\n\n<p>The successful firm will sign a contract with the Government of Liberia through the Project Implementation Unit at the Ministry of Commerce and Industry. The firm shall be supervised by the EPA&rsquo;s ESIA and ICT Unit. The Administrative focal point for this consultancy is the LIFT project&rsquo;s Acting Coordinator. The EPA will lead the technical supervision of this project, while the LIFT project PIU will oversee the project management aspect.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00405217","notice_type":"Request for Expression of Interest","noticedate":"30-Oct-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-11-12T00:00:00Z","submission_deadline_time":"12:00","project_ctry_name":"West Bank and Gaza","project_id":"P174355","project_name":"Digital West Bank & Gaza Project","bid_reference_no":"GZ-MTIT-513737-CS-QCBS","bid_description":"Cybersecurity Risk Assessment","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Ramallah, West Bank","contact_ctry_name":"West Bank and Gaza","contact_email":"ohoud.jarrar@mtde.gov.ps","contact_name":"Ohoud Jarrar","contact_organization":"Ministry of Telecommunication and Information Technology","contact_phone_no":"+970562660106","submission_date":"2025-10-30T00:00:00Z","notice_text":"<p><strong><em>REQUEST FOR EXPRESSIONS OF INTEREST</em></strong></p>\n\n<p><strong><em>(CONSULTING SERVICES - FIRMS SELECTION)</em></strong></p>\n\n<p><strong><em>Palestine</em></strong></p>\n\n<p><strong><em>Digital West Bank &amp; Gaza Project (P174355)</em></strong></p>\n\n<p><strong><em>Grant number: (TF0B5236)</em></strong></p>\n\n<p><strong><em>Assignment Title:&nbsp;Top of Form</em></strong></p>\n\n<p><strong><em>Cybersecurity Risk Assessment Bottom of Form</em></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong><em>Reference No.:&nbsp;</em></strong><em>GZ-MTIT-513737-CS-QCBS</em></p>\n\n<p><em>The Palestinian Liberation Organization has received a grant from the International Development Association (IDA) for USD 20 million for the benefit of the Palestinian Authority (PA) to finance the Digital West Bank &amp; Gaza Project (the Project). The Project will seek to produce concrete and tangible results for the Palestinians by enhancing access to high-speed broadband services and increasing access to selected e-services for citizens and businesses. The Project will focus on key points to unleash digital transformation in the Palestinian territories, addressing some of the bilateral challenges that prevent digital transformation from achieving its full potential. It will strengthen the Palestinian territories&#39; digital resilience and the PA&#39;s ability to respond to shocks such as COVID-19.</em></p>\n\n<p><em>Cybersecurity in Palestine operates within a complex and evolving landscape, marked by a growing digital presence alongside the challenges inherent in a developing governance structure and ongoing political complexities. Recognizing the increasing reliance on digital infrastructure and the corresponding rise in cyber threats, the Palestinian cabinet, in November 2022, made a significant decision regarding the establishment of a dedicated Cybersecurity Authority. This decision also assigned a government team the responsibility for leading its establishment. Accordingly, the draft of Cybersecurity Law has been submitted for final endorsement.</em></p>\n\n<p><em>Palestine has taken steps to address cybercrime, notably through Law by Decree No. 10 of 2018 on Cybercrime, which superseded an earlier Law by Decree No. 16 of 2017. This law aims to criminalize various cyber offenses, including unauthorized access, data manipulation, obstruction of electronic services, and the production/dissemination of malware. It also established a specialized Cybercrime Unit within police agencies. A revised version for the cybercrime law is in process. </em></p>\n\n<p><em>In steps towards more harmonized legislation that aligns with international standards and best practices, The MTDE has been working on e-transactions and Data Protection Laws. </em></p>\n\n<p><em>The Law by Decree No.17 of 2024 on e-Transaction law included the adoption of electronic signatures, electronic seals, time stamps, electronic delivery services, and electronic authentication certificates. In addition, it regulates the licensing of electronic trust service providers, setting clear standards to ensure their adherence to the highest levels of security, with the aim of regulating and developing the legal infrastructure for trust services and implementing transactions.</em></p>\n\n<p><em>Meanwhile, the MTDE is putting efforts towards finalizing Data Protection Law to create a legal framework that balances individuals&#39; rights to data protection with allowing the processing and retention of data and information within cyberspace and the spread of data concepts and artificial intelligence.</em></p>\n\n<p><em>This consulting service aims at two main activities:</em></p>\n\n<p><strong><em>Activity 1</em></strong><em>: conduct a thorough cybersecurity maturity assessment targeting five agencies of the Government of Palestine, namely, Ministry of Interior (MoI), Ministry of Foreign Affairs (MoFA), Ministry of Telecommunications and Digital Economy (MTDE), Ministry of Health (MoH), and Ministry of Justice, which will jointly be referred to as &ldquo;the MDAs&rdquo;. The objective of the assessment is to review the cybersecurity posture of the MDAs and provide actionable recommendations to strengthen their overall cybersecurity maturity and enable them to proficiently manage cybersecurity risks.</em></p>\n\n<p><strong><em>Activity 2:</em></strong><em> support the MTDE to design, establish, and operationalize a GovSOC function that will perform services such as monitoring and situational awareness, vulnerability management, event and incident management among others. This activity will have multiple components, including the drafting of policies, procedures, standards, and guidelines. It will also propose a structure for the GovSOC that is technically, financially, and operationally sustainable, responding to the scale of possible Government operations; support the Government in standing up and operationalizing that structure; provide trainings for the GovSOC personnel; and assist the GovSOC to establish relationships with other international/regional CSIRTs and SOCs, including acquiring FIRST membership.</em></p>\n\n<p><em>The Terms of Reference (TOR) for the assignment can be found at the following link</em></p>\n\n<p>https://bit.ly/CYMTDE</p>\n\n<p>&nbsp;<em>The&nbsp;<strong>Ministry of Telecom and Digital Economy (MTDE)</strong>&nbsp;now invite eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</em></p>\n\n<p>&nbsp;<em>The shortlisting criteria of the firm is: core business and years in business; relevant experience with references; and technical and managerial capability of the firm. Key Experts will not be evaluated at the shortlisting stage.</em></p>\n\n<p>&nbsp;<em>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</em></p>\n\n<p>&nbsp;<em>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</em></p>\n\n<p>&nbsp;<em>A Consultant will be selected in accordance with the&nbsp;<strong>Quality and Cost Based Selection (QCBS)</strong>&nbsp;procurement method set out in the Procurement Regulations.</em></p>\n\n<p>&nbsp;<em>Further information can be obtained at the address below during office hours: Sunday &ndash; Thursday (09:00 AM &ndash; 01:00 PM) (Local Time GMT +2)</em></p>\n\n<p>&nbsp;<em>Ahmad Khatib - Procurement Specialist</em></p>\n\n<p><em>e-mail:&nbsp;</em><em>akhatib@mtde.gov.ps</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;<em>Expressions of interest must be delivered in a written form to the address below (in person, or by e-mail) by <strong>November 12th, 2025, 12:00PM Local time</strong></em></p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><em>Ministry of Telecommunications and Digital Economy</em></li>\n\t<li><em>Attn: Ahmad Khatib - Procurement Specialist</em></li>\n\t<li><em>Postal code:&nbsp;P6140389</em></li>\n\t<li><em>Al-Bireh &ndash; Al-Mobadeen St.</em></li>\n\t<li><em>Tel: +970-2-2943333 ext 344</em></li>\n\t<li><em>Mobile: +970-562-660-106</em></li>\n\t<li><em>E-mail:&nbsp;</em><em>akhatib</em><em>@mtde.gov.ps</em><strong><em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </em></strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong><em>&nbsp;Dr. Abdulrazak Natsheh</em></strong></p>\n\n<p><strong><em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Minister of Telecommunications and Digital Economy</em></strong></p>"},{"id":"OP00376045","notice_type":"Request for Expression of Interest","noticedate":"29-Aug-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-09-29T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Brazil","project_id":"P168634","project_name":"Parana Public Sector Modernization and Innovation for Service Delivery Operation","bid_reference_no":"BR-SPPE-340218-CS-QCBS","bid_description":"Plano de Dimensionamento da Força de Trabalho - Contratação de consultoria para elaboração de dimensionamento da força de trabalho da administração direta e autárquica do estado do Paraná.","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Rua Jacy Loureiro de Campos - Centro Cívico, Curitiba - PR, 82590-300","contact_ctry_name":"Brazil","contact_email":"licita.bird@seap.pr.gov.br","contact_name":"Wellington Dias de Paula","contact_organization":"Secretaria de Estado da Administração e da Previdência / State Secretariat for Administration and Social Security (SEAP)","contact_phone_no":"(41) 3313-6362","contact_web_url":"www.administracao.pr.gov.br","submission_date":"2025-08-29T00:00:00Z","notice_text":"<p><em>NOTICE OF REQUEST FOR EXPRESSION OF INTEREST IN SELECTION</em></p>\n\n<p><em>BASED ON QUALITY AND COST &ndash; SMI 003/2025</em></p>\n\n<p>&nbsp;</p>\n\n<p><strong>SELECTION OF CONSULTANCY IN PROJECT FINANCED BY THE IBRD TO PREPARE A WORKFORCE SIZING PLAN FOR THE DIRECT ADMINISTRATION AND AUTONOMOUS AGENCIES OF THE STATE OF PARAN&Aacute;</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Brazil</strong></p>\n\n<p><strong>Innovation and Modernization Project for Public Management in Paran&aacute; - EFFICIENT PARAN&Aacute; PROJECT</strong></p>\n\n<p><strong>Loan Agreement: </strong>N&deg;. 9378-BR[1] - BIRD</p>\n\n<p><strong>Contract Object</strong>: Preparation and implementation of a Sizing methodology, based on pre-existing models and/or models developed for this purpose, and a Workforce Adequacy Plan (replacement, expansion and optimization) for agencies and entities of the Direct Administration and Autonomous Agencies of the State of Paran&aacute;, aiming at providing subsidies for the entry policy for the short, medium and long term, based on the identification of a sufficient and adequate number of employees so that the agencies can deliver the public services they are responsible quickly and efficiently, and also an information technology system that includes the means for their continuous management and monitoring.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference N&deg;.</strong>: BR-SPPE-340218-CS-QCBS</p>\n\n<p>&nbsp;</p>\n\n<p>1.&nbsp; &nbsp; The State of Paran&aacute; received a loan from the International Bank for Reconstruction and Development (IBRD) under the Paran&aacute; Public Management Innovation and Modernization Program &ndash; Efficient Paran&aacute; for the Development of Paran&aacute;. The program was structured to respond the challenges faced by the State of Paran&aacute; in providing health and other priority public services, in addition to supporting the implementation of the economic recovery plan in response to the short, medium, and long term impacts of the COVID-19 pandemic. The project&#39;s main overall objective is to mitigate the impacts of COVID-19 on health and improve the efficiency and effectiveness of health service delivery, environmental management, and public administration through management reforms and the use of information technology.</p>\n\n<p>2.&nbsp; &nbsp; This request for Expression of Interest is in accordance with the General Procurement Notice for this Project, published on Development Business online (UNDB online), on: 19/02/2024.</p>\n\n<p>3.&nbsp; &nbsp; Thus, the State of Paran&aacute;, through the State Secretariat for Planning - SEPL and the Department of Human Resources and Social Security - DRH of the State Secretariat for Administration and Social Security - SEAP, inform that they will prepare a Short List of institutions for selection of Consulting in the Preparation of the Workforce Sizing Plan, in accordance with the Acquisition Regulation for Borrowers of Investment Project Financing Operations in the acquisition operations of Goods, Works, Technical Services and Consulting Services, resulting from an Agreement in the form of Investment Project Financing - IPF for AT, Fourth Edition, November 2020.<br />\nThe State Secretariat of Administration and Social Security invites eligible consulting institutions to express their interest in providing the Services. Interested consulting firms must provide information demonstrating their required qualifications and relevant experience to perform the Services. The Short List criteria are as follows: core business, number of years in the business, and relevant experiences. Lead Specialists will not be evaluated at the Short list stage.</p>\n\n<p>4.&nbsp; &nbsp; The consulting services covered by the Terms of Reference (TDR) cover the diagnosis, sizing, and planning of the State of Paran&aacute;&#39;s workforce within 11 (eleven) agencies and entities, including the collection of information and standards, interviews, diagnostics, and flows and tools available within the agencies involved. The services include the development of an Information System for managing workforce planning.</p>\n\n<p>5.&nbsp; &nbsp; The consulting services to be contracted aim to develop and implement a methodology for sizing and adequacy plan of the workforce (replacement, expansion and optimization) of the Direct Administration and Autonomous Agencies of the State of Paran&aacute;, indicating the priority sectors and their respective costs, as well as suggestions for improving management that allow for more efficient use of resources related to personnel expenses in accordance with the structures contained in Annexes I and II of the Terms of Reference, which provide subsidies for the recruitment policy for the short, medium and long term, based on the identification of a sufficient and adequate number of employees so that the agencies can deliver their respective public services quickly and efficiently, and also the formulation and implementation of an information technology system that includes the means for continuous management and monitoring through system development and integration of software tools.&nbsp;</p>\n\n<p>6.&nbsp; &nbsp; The full implementation of this project is expected to last 21 (twenty-one) months.</p>\n\n<p>7.&nbsp; &nbsp; The details of the Terms of Reference (TDR) for these Services are attached to this Notice of Request for Expression of Interest and available on the website: https://www.administracao.pr.gov.br/Compras.</p>\n\n<p>8.&nbsp; &nbsp; Eligible institutions interested in providing these services must express their interest by submitting information demonstrating the experience and expertise required to perform the requested services. To this end, they must submit:<br />\na.&nbsp; &nbsp; Characterization of the company/institution containing all data according to model &ldquo;A&rdquo;.<br />\nb.&nbsp; &nbsp; List of completed and completed work similar to the subject matter of the TDR, with proof of services provided. Submit a completed table according to model &quot;B.&quot;<br />\nc.&nbsp; &nbsp; Declaration of intent to form a consortium, if appropriate. In this case, identify the institution with which you intend to establish the consortium relationship, according to model &quot;C.&quot; The required information must include the identification of each potential consortium member, as well as their respective legal representatives. Formalization of the consortium is required only upon signing the contract, whereby the members will be equally responsible.<br />\nd.&nbsp; &nbsp; Documentation grouped and numbered in a unique, continuous and sequential way.<br />\ne.&nbsp; &nbsp; The pages corresponding to the documentation supporting the information included in the tables (models A, B and C) must be numbered in sequence.<br />\nf.&nbsp; &nbsp; Other information or documents that the company/institution considers relevant to demonstrate its experience in services related to the subject of the TDR;<br />\ng.&nbsp; &nbsp; Documentation that is not presented in accordance with models &ldquo;A&rdquo;, &ldquo;B&rdquo; and &ldquo;C&rdquo; and as follows will be disregarded:<br />\n&bull;&nbsp; &nbsp; Tables must be submitted in PDF format and in editable format (Excel);<br />\n&bull;&nbsp; &nbsp; If necessary, add rows to the table;<br />\n&bull;&nbsp; &nbsp; Documents not indicated in the table will not be considered.</p>\n\n<p>9.&nbsp; &nbsp; This Request for Expression of Interest, as well as the expression itself, does not imply any commitment to hiring.</p>\n\n<p>10.&nbsp; &nbsp; Institutions will be selected according to the evaluation criteria for the composition of the &ldquo;Short List&rdquo;, according to their proven experience.</p>\n\n<p>11.&nbsp; &nbsp; World Bank standards require consultants to provide professional, objective, and impartial advice, always prioritizing the client&#39;s interests without considering the possibility of future work. When offering consultancy, they must avoid conflicts with other services or their own corporate interests. Consultants may not be hired to perform any task that conflicts with their current or previously undertaken obligations to other clients, nor may it place them in a position that prevents them from performing the service in a manner that best serves the borrower&#39;s interests.</p>\n\n<p>12.&nbsp; &nbsp; The selection and hiring of the consultancy will follow the provisions of the Acquisition Regulation for Borrowers of Investment Project Financing Operations in the acquisition of Goods, Works, Technical Services and Consulting Services, resulting from an Agreement in the form of Investment Project Financing - IPF for AT, Fourth Edition, November 2020.</p>\n\n<p>Available at:<br />\nPortuguese -<br />\nhttps://www.planejamento.pr.gov.br/sites/default/arquivos_restritos/files/documento/2022-12/Regulamento_de_Aquisi%C3%A7%C3%B5es_2020_PORT_reduced.pdf</p>\n\n<p>English -<br />\nhttps://thedocs.worldbank.org/en/doc/1783315330658711950290022020/original/ProcurementRegulations.pdf</p>\n\n<p>13.&nbsp; &nbsp; Consulting firms may associate with other institutions to enhance their qualifications; however, they must clearly indicate whether the association will be a joint venture (consortium) or subcontracting. In the case of a joint venture (consortium), all members must be jointly and severally liable for the entire contract if the joint venture (consortium) is selected.</p>\n\n<p>14.&nbsp; &nbsp; Without limiting the general nature of the above, consultants will not be hired in the situations described in the clauses dealing with conflicts of interest in the Procurement Regulation.<br />\nIt is the Bank&#39;s policy to require all borrowers, contractors and their agents, as well as all employees linked to them, to maintain the highest ethical standards during the selection and execution of contracts financed by the Bank under item 3.33 of the Procurement Regulations for Borrowers of Investment Project Financing Operations in the acquisition of Goods, Works, Technical Services and Consulting Services, arising from an Agreement in the form of Investment Project Financing - IPF for AT, Fourth Edition, November 2020.</p>\n\n<p>15.&nbsp; &nbsp; Further information can be obtained by calling: (41) 3313-6221 and email: licita.bird@seap.pr.gov.br.</p>\n\n<p>16.&nbsp; &nbsp; Expressions of interest will be received necessarily electronically, from&nbsp;August 29, 2025 to September 29, 2025 at the address: licita.bird@seap.pr.gov.br, Access links to virtual servers and digital format, in .pdf format, and must be accompanied by tables and supporting documents, as per Models A, B and C.</p>\n\n<p>16.1. The tables relating to Models A, B and C will be received necessarily electronically, at the address: licita.bird@seap.pr.gov.br, Access links to virtual servers and digital format, in PDF and 1 (one) editable copy in Excel.</p>\n\n<p>17. Expressions of interest will be received until 5:00 p.m. (five o&#39;clock in the afternoon) on the last day of the deadline established as per the official publication of the bidding process.</p>\n\n<p><br />\nCuritiba, 29 of august of 2025.</p>\n\n<p>&nbsp;</p>\n\n<p>[1]&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Source: https://www.planejamento.pr.gov.br/Pagina/Parana-Eficiente-Banco-Mundial</p>\n\n<p>&nbsp;</p>\n\n<p>MODEL &ldquo;A&rdquo; - Characterization of the company/institution</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:921px; width:672px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:30.0pt; width:21.6pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.0pt; vertical-align:bottom; width:21.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.0pt; width:207.6pt\">\n\t\t\t<p><strong>Company/Institution Data</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.0pt; width:139.05pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:30.0pt; width:42.5pt\">\n\t\t\t<p><strong>Page N&deg;.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"18\" style=\"border-color:black; height:15.75pt; width:21.1pt\">\n\t\t\t<p><strong>Interested Institution</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:207.6pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Segment</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Date of incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Legal nature</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Size (Number of employees)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Legal representative</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Full address</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Telephone</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>e-mail</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:21.6pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:207.6pt\">\n\t\t\t<p>Website address</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.9pt; width:21.6pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:207.6pt\">\n\t\t\t<p>Your company&#39;s main area of activity</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; vertical-align:bottom; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:28.05pt; width:21.6pt\">\n\t\t\t<p>14</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.05pt; width:207.6pt\">\n\t\t\t<p>Consulting areas of activity: Public Management, People Management, others (specify)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.05pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.05pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:37.75pt; width:21.6pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.75pt; width:207.6pt\">\n\t\t\t<p>What services do you offer (Recruitment and Selection, HR Consulting, Training and Development etc.)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.75pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:37.75pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:24.8pt; width:21.6pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.8pt; width:207.6pt\">\n\t\t\t<p>How long has the company been operating in Human Resources Management Consulting?</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.8pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.8pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:20.9pt; width:21.6pt\">\n\t\t\t<p>17</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.9pt; width:207.6pt\">\n\t\t\t<p>Approximate number of contracts signed in the last 12 months:</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.9pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:20.9pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.9pt; width:21.6pt\">\n\t\t\t<p>18</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:207.6pt\">\n\t\t\t<p>Other information (list/include lines)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:139.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:42.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Complete the information as above, attaching supporting documents and indicating the corresponding page. If submitting other relevant data/documents in addition to those indicated in the table, add additional lines.<br />\nDocuments not indicated in the table will not be considered.<br />\nAll documentation relating to the full versions of Models A, B and C must have unique, sequential and continuous numbering.<br />\nThe table must be submitted in PDF format and in editable format (Excel).</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>MODEL &ldquo;B&rdquo; - Main projects similar to the subject of the TDR executed and under completion in the last 36 months</p>\n\n<p>Project 1: Name (fill in the table for each project).</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:1271px; width:673px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:30.0pt; width:23.15pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; height:30.0pt; width:260.8pt\">\n\t\t\t<p><strong>Data</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:30.0pt; width:132.05pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:30.0pt; width:49.1pt\">\n\t\t\t<p><strong>Page No.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"14\" style=\"height:15.75pt; width:19.85pt\">\n\t\t\t<p><strong>Contractor</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Segment</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Size (Number of employees)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Full address</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Municipality</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>State</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Telephone</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>e-mail</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Website address</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Sphere (Private, Municipal, State, Federal)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Legal regime (Statutory or Employment Law)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>14</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Other information (list/include lines)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"13\" style=\"height:15.75pt; width:19.85pt\">\n\t\t\t<p><strong>Contract/supporting document</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Object</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Project Area</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>17</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Workforce sizing (yes/no)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>18</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Other area (specify)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.0pt; width:23.15pt\">\n\t\t\t<p>19</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:240.95pt\">\n\t\t\t<p>Number of servers/employees covered by the contract/project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Products delivered</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>21</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>System development (yes/no)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>22</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Contract signature date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>23</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Start date of execution</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>24</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>End date of execution</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>25</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Duration in months</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>26</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Total contract value</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; width:23.15pt\">\n\t\t\t<p>27</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:240.95pt\">\n\t\t\t<p>Other information (list/include lines)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:132.05pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:49.1pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Complete the information as above, attaching supporting documents and indicating the corresponding page. If submitting other relevant data/documents in addition to those indicated in the table, add additional lines.<br />\nDocuments not indicated in the table will not be considered.<br />\nPresent the data from the table above for each project.<br />\nAll documentation relating to the full versions of Models A, B and C must have unique, sequential and continuous numbering.<br />\nThe table must be submitted in PDF format and in editable format (Excel).</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>MODEL &ldquo;C&rdquo; &ndash; Companies/institutions intending to form the consortium</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:839px; width:749px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:32.25pt; width:22.95pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.25pt; width:224.6pt\">\n\t\t\t<p><strong>Consortium Company/Institution Data</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.25pt; width:136.45pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.25pt; width:40.7pt\">\n\t\t\t<p><strong>Page No.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"border-color:black; height:15.75pt; vertical-align:top; width:22.95pt\">\n\t\t\t<p><strong>1</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"border-color:black; height:15.75pt; vertical-align:top; width:401.75pt\">\n\t\t\t<p>MAIN/LEADER CONSORTIUM MEMBER</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Declaration of intention to form a consortium</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"border-color:black; height:15.75pt; vertical-align:top; width:22.95pt\">\n\t\t\t<p><strong>2</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.75pt; vertical-align:top; width:401.75pt\">\n\t\t\t<p>CONSORTIUM MEMBER 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Declaration of intention to form a consortium</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"border-color:black; height:15.75pt; vertical-align:top; width:22.95pt\">\n\t\t\t<p><strong>3</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.75pt; vertical-align:top; width:401.75pt\">\n\t\t\t<p>CONSORTIUM 2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Declaration of intention to form a consortium</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"border-color:black; height:15.75pt; vertical-align:top; width:22.95pt\">\n\t\t\t<p><strong>4</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:15.75pt; vertical-align:top; width:401.75pt\">\n\t\t\t<p>CONSORTIUM 3</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Company name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>CNPJ</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:224.6pt\">\n\t\t\t<p>Declaration of intention to form a consortium</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:136.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:40.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Present the information/data from models &ldquo;A&rdquo; and &ldquo;B&rdquo; for each company/institution intending to form the consortium.<br />\nInsert lines if necessary<br />\nDocuments not indicated in the table will not be considered.<br />\nThe table must be submitted in PDF format and in editable format (Excel).</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>HIRING OF CONSULTANCY FOR ELABORATION THE SIZING OF THE WORKFORCE OF THE DIRECT ADMINISTRATION AND </strong><strong>AUTONOMOUS</strong><strong> AGENC</strong><strong>IES </strong><strong>OF THE STATE OF PARAN&Aacute;</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>SUMMARY<br />\n1.&nbsp; &nbsp; &nbsp;CONTEXT&nbsp; &nbsp; 4<br />\n2.&nbsp; &nbsp; &nbsp;JUSTIFICATION&nbsp; &nbsp; 4<br />\n3.&nbsp; &nbsp; &nbsp;OBJECTIVES&nbsp; &nbsp; 7<br />\n3.1.&nbsp; &nbsp; &nbsp;GENERAL OBJECTIVE&nbsp; &nbsp; 7<br />\n3.2.&nbsp; &nbsp; SPECIFIC OBJECTIVES&nbsp; &nbsp; 7<br />\n4. GENERAL GUIDELINES AND SCOPE&nbsp; &nbsp; 8<br />\n4.1. WORKFORCE&nbsp; &nbsp; 9<br />\n4.2. METHODOLOGICAL PROPOSAL TO BE DETAILED IN THE WORK PLAN SHOULD CONSIDER THE FOLLOWING ASPECTS:&nbsp; &nbsp; 9<br />\n5. PRODUCTS INCLUDED IN THIS TERM&nbsp; &nbsp; 10<br />\n5.1. PHASE 1: WORK PLAN&nbsp; &nbsp; 10<br />\n5.2. PHASE 2: SURVEY OF THE CURRENT SITUATION AND SIZING OF THE WORKFORCE&nbsp; &nbsp; 12<br />\n5.2.1.&nbsp; &nbsp; &nbsp;Survey of the Current Situation&nbsp; &nbsp; 12<br />\n5.2.2. Workforce Sizing&nbsp; &nbsp; 14<br />\n5.3. PHASE 3: WORKFORCE ADEQUACY PLAN (REPLACEMENT, EXPANSION AND OPTIMIZATION) FOR THE SHORT, MEDIUM AND LONG TERM AND WORKFORCE PLANNING INSTITUTIONALIZATION PLAN&nbsp; &nbsp; 17<br />\n5.3.1. The Adequacy and Implementation Plan for Replacement, Expansion and Optimization&nbsp; &nbsp; 17<br />\n5.3.1.2. Main Activities for Execution:&nbsp; &nbsp; 18<br />\n5.3.2. The Workforce Planning Institutionalization Plan&nbsp; &nbsp; 18<br />\n5.4. PHASE 4: COMMUNICATION AND TRAINING PLAN FOR MANAGERS WORKING IN THE TECHNICAL AREA AND PEOPLE MANAGEMENT.&nbsp; &nbsp; 19<br />\n5.5. PHASE 5: FORMULATION AND IMPLEMENTATION INFORMATION OF TECHNOLOGY SYSTEMATICS APPLIED TO WORKFORCE SIZING &ndash; DEVELOPMENT OF INFORMATION SYSTEMS.&nbsp; &nbsp; 20<br />\n5.5.1. Information Technology Systematics Applied to Workforce Sizing &ndash; Development of Information Systems.&nbsp; &nbsp; 21<br />\n5.5.1.1. System Project Plan&nbsp; &nbsp; 22<br />\n5.5.1.2. Business Process Modeling&nbsp; &nbsp; 22<br />\n5.5.1.3. Data Load Module&nbsp; &nbsp; 22<br />\n5.5.1.4. Sizing Module&nbsp; &nbsp; 23<br />\n5.5.1.5. Global Integration (final delivery)&nbsp; &nbsp; 23<br />\n6.&nbsp; &nbsp; &nbsp;PHYSICAL-FINANCIAL EXECUTION SCHEDULE OF PRODUCTS&nbsp; &nbsp; 24<br />\n7.&nbsp; &nbsp; FORM OF PRESENTATION AND DELIVERY OF PRODUCTS (TABLE 2)&nbsp; &nbsp; 25<br />\n8.&nbsp; &nbsp; AVAILABLE INPUTS&nbsp; &nbsp; 25<br />\n9.&nbsp; &nbsp; EXECUTIVE GROUP RESPONSIBLE FOR MONITORING AND APPROVAL OF PRODUCTS&nbsp; &nbsp; &nbsp; &nbsp; 26<br />\n10. KEY TEAM&nbsp; &nbsp; 26<br />\n11. SUPPORT TEAM&nbsp; &nbsp; 27<br />\nANNEX I - LIST OF AGENCIES/ENTITIES OF DIRECT ADMINISTRATION AND AUTONOMOUS AGENCIES OF THE STATE OF PARAN&Aacute;&nbsp; &nbsp; 28<br />\nANNEX II - NUMBER OF POSITIONS/FUNCTIONS PER CAREER CADRE&nbsp; &nbsp; 29<br />\nANNEX III - GUIDELINES AND REQUIREMENTS SPECIFICATION FOR SOFTWARE DEVELOPMENT&nbsp; &nbsp; 30<br />\n(PHASE 5 &ndash;5.5)&nbsp; &nbsp; 30<br />\n1.&nbsp; &nbsp; SCOPE AND LIMITS OF THE PRODUCT&nbsp; &nbsp; 30<br />\n1.1.&nbsp; &nbsp; GENERAL DEFINITIONS ABOUT SYSTEM PROJECT&nbsp; &nbsp; 30<br />\n1.2.&nbsp; &nbsp; PHYSICAL VIEW OF THE SYSTEM&nbsp; &nbsp; 31<br />\n1.2.1&nbsp; &nbsp; &nbsp;SEAP SYSTEMS TO BE INTEGRATED&nbsp; &nbsp; 32<br />\n2.&nbsp; &nbsp; ACTIVITIES TO BE DEVELOPED&nbsp; &nbsp; 33<br />\n2.1. SYSTEM PROJECT PLAN&nbsp; &nbsp; 33<br />\n2.2. DESIGN AND DEVELOPMENT&nbsp; &nbsp; 34<br />\n2.2.1. BUSINESS PROCESS MODELING&nbsp; &nbsp; 34<br />\n2.2.2. SYSTEMS ANALYSIS AND DESIGN&nbsp; &nbsp; 34<br />\n2.2.3. SOFTWARE ANALYSIS AND DESIGN&nbsp; &nbsp; 35<br />\n2.3. INTEGRATION AND QUALIFICATION&nbsp; &nbsp; 35<br />\n2.3.1. PREPARATION OF THE SYSTEM TEST PLAN&nbsp; &nbsp; 36<br />\n2.3.2. TESTING PROCEDURES&nbsp; &nbsp; 36<br />\n2.3.3. ACCEPTANCE TESTS &ndash; APPROVAL ENVIRONMENT&nbsp; &nbsp; 36<br />\n2.3.4. ACCEPTANCE TESTING &ndash; PRODUCTION ENVIRONMENT&nbsp; &nbsp; 36<br />\n2.4.&nbsp; &nbsp; &nbsp;TRANSITION&nbsp; &nbsp; 37<br />\n2.4.1.&nbsp; &nbsp; &nbsp;ASSISTED OPERATION&nbsp; &nbsp; 37<br />\n2.4.2. DATA INTEGRATION&nbsp; &nbsp; 38<br />\n2.5.&nbsp; &nbsp; SOURCE CODE&nbsp; &nbsp; 38<br />\n2.6.&nbsp; &nbsp; DOCUMENTATION&nbsp; &nbsp; 39<br />\n2.7.&nbsp; &nbsp; TRANSFER OF TECHNOLOGY&nbsp; &nbsp; 39<br />\n2.8.&nbsp; &nbsp; APPROVAL OF THE INTEGRATED ENVIRONMENT&nbsp; &nbsp; 40<br />\n2.9.&nbsp; &nbsp; MAINTENANCE AND TECHNICAL SUPPORT&nbsp; &nbsp; 40<br />\n2.10.&nbsp; &nbsp; SYSTEM OPERATION INFRASTRUCTURE SPECIFICATION&nbsp; &nbsp; 42<br />\n2.11.&nbsp; &nbsp; PREPARATION OF DEVELOPMENT, APPROVAL AND PRODUCTION ENVIRONMENTS&nbsp; &nbsp; 43<br />\n3.&nbsp; &nbsp; PRODUCTS, EXPECTED RESULTS, FORM OF PRESENTATION AND ACCEPTANCE OF SERVICES&nbsp; &nbsp; 43<br />\n3.1.&nbsp; &nbsp; PRODUCTS AND BY-PRODUCTS TO BE SUPPLIED&nbsp; &nbsp; 43<br />\n3.2.&nbsp; &nbsp; FORM OF PRESENTATION AND ACCEPTANCE OF PRODUCTS&nbsp; &nbsp; 45<br />\n3.3.&nbsp; &nbsp; PLACE OF SERVICE PERFORMANCE&nbsp; &nbsp; 46<br />\n4.&nbsp; &nbsp; TECHNOLOGICAL PARTNER&nbsp; &nbsp; 46<br />\n5.&nbsp; &nbsp; CELEPAR PRODUCTION ENVIRONMENT&nbsp; &nbsp; 47<br />\nANNEX IV&nbsp; &nbsp; &nbsp; &nbsp; 49</p>\n\n<p>&nbsp;</p>\n\n<p>TERMS OF REFERENCE</p>\n\n<p><br />\n<strong>HIRING OF CONSULTANCY FOR ELABORATION THE SIZING OF THE WORKFORCE OF THE DIRECT ADMINISTRATION AND AUTONOMOUS AGENCIES OF THE STATE OF PARAN&Aacute;</strong></p>\n\n<p>1.&nbsp; &nbsp; &nbsp;CONTEXT</p>\n\n<p>The Direct Administration and Autonomous Agencies of the Executive Branch of the State of Paran&aacute; is structured into forty-seven agencies and, to meet its responsibilities, relies on a workforce that totals, considering all types of service provision, 125,043[1]&nbsp; positions/functions. This structure serves the 399 municipalities of the State in a centralized or decentralized manner and includes statutory employees (civil and military), employees under the CLT, temporary hires, positions in commission without a bond and interns.</p>\n\n<p>The State Secretariat for Administration and Social Security (SEAP) is responsible for managing the state&#39;s human resources through the Human Resources and Social Security Department (DRH/SEAP), a unit responsible for formulating, standardizing and monitoring public policies in this sector. Specifically, with regard to planning and supplying human resources, the Human Resources Recruitment and Selection Division (DSRH) is responsible for analyzing applications for admission of civil servants (civil and military) and temporary contracts through special regime contracts (CRES). These modalities correspond to 94.8% of the total available workforce.</p>\n\n<p>2.&nbsp; &nbsp; &nbsp;JUSTIFICATION</p>\n\n<p>The current economic and social situation in Brazil requires that the public administra-tion rethink its role and seek to optimize the application of the resources at its disposal, emphasizing results and improving the services provided to the population. However, the effective execution of services depends largely on the workforce, whether for the implementation of public policies or for developing and articulating solutions to the de-mands of the State.<br />\nOn the other hand, managers shall ensure the maintenance of services and the achieve-ment of results while at the same time reconciling their actions with the available finan-cial, budgetary, human and material resources and complying with the expenditure limits set by the Fiscal Responsibility Law.<br />\nAdded to this context was the scenario outlined by the outbreak of the Coronavirus pandemic, which had a strong impact on the economy and the demand for certain ser-vices, leading to an imbalance in public finances. This combination of factors requires that the State&#39;s strategic actions converge to address it, as well as to implement immedi-ate interventions in the areas of Health and sectors with the potential to leverage the resumption of economic growth. In this line of understanding, Workforce Sizing emerg-es as a tool to drive this direction, as it will support the formulation of guidelines for people management to face these challenges.<br />\nGiven this scenario, it is essential and urgent to adopt a methodology to obtain subsidies with technical grounds for establishing a policy for hiring civil servants in the short, me-dium and long term, based on the identification of a sufficient and adequate number of professionals in order to enable agencies to deliver public services quickly and efficient-ly. It is also necessary to indicate the academic and professional profile aligned with each of the segments of state activity.<br />\nThe absence of such methodology sometimes results in the cost being prioritized over the benefit of a given recruitment of personnel, however without being able to assess the resulting loss due to the failure to achieve results in government projects and programs affected by the lack of these professionals.<br />\nCurrently, a well-founded methodology based on pre-established sizing parameters is not adopted. When analyzing requests for authorization to enter through a public selec-tion process, formal aspects are predominantly considered, such as: (i) the existence of vacant positions in the careers to which the personnel is intended; (ii) compatibility of the positions/functions with the indicated duties and with the corresponding position structure; (iii) the justification presented; (iv) the number of civil servants in the posi-tions/functions that are the subject of the demand. It should be noted that, in relation to this last point, the ideal is to consider, in addition to the quantity, the situation of these civil servants in terms of productivity, time until retirement, among others.<br />\nThe same applies to requests for temporary hires, but with some aggravating factors, since these are intended to replace an employee who is temporarily away, considering that the number of employees may be oversized, the need for replacement in some cases is questionable and may be unnecessary. It should also be considered that not every dismissal or temporary absence necessarily has to give rise to a replacement.<br />\nIn addition to all these factors, it is essential to recognize that the area of human re-sources management in state administration faces a dilemma between providing the de-partments with qualified employees, with compatible and attractive remuneration, and in sufficient numbers to meet the demands for public services, and the imperative need to adjust to the spending limits imposed by the Fiscal Responsibility Law.<br />\nIncidentally, personnel expenses have frequently reached worrying levels, which reaf-firms the need for in-depth reflection on the rational allocation of financial and human resources and their effectiveness. It is worth noting that the diversity of career cadre and the remuneration structure based on differentiated treatment for certain units limits the administration&#39;s ability to reallocate personnel between the various departments.<br />\nWhile the recruitment of employees, whether to maintain the provision of services or to implement new demands, requires better planning and greater agility, the loss of em-ployees is continuous and affects all departments. To better demonstrate the magnitude of the numerical reduction over the last 9.6 years, the figures recorded in September 2015 can be used again, when the total workforce was 195,529 positions/functions and the average monthly number of dismissals was 412.67.<br />\nThe layoffs, whose current monthly average is around 336[2]&nbsp; positions, the fact that 45.2%[3]&nbsp; of the effective employees are in the age group of 50 years or more, with service time approaching retirement, demand a planning of restructuring of the career cadre that allows the necessary transfer of technical knowledge and experience acquired over the years.<br />\nIn order to mitigate the losses resulting from the lack of replacement of dismissed civil servants, a decree was issued that establishes Replacement Rates[4]&nbsp; for most positions provided for in the careers of Direct Administration and Autonomous Agencies. How-ever, its implementation requires constant monitoring through a structured methodology, which shall be integrated into the dimensioning of the workforce, complementing the planning tools for adequacy (replacement, expansion and optimization) of servers.<br />\nThat said, it is essential that the Administration has the elements to establish the bases of its personnel structure and identify where, in which activities, each type of contractual relationship applies: statutory, temporary, intern, outsourced services, among others. Furthermore, based on a consistent diagnosis, it is possible to detect, in addition to the lack of employees, the need for training, modernization of work processes and invest-ment in information technology, in its broadest sense.<br />\nIt is important to highlight the relevance of diagnosis and planning of human resources in Public Administration, as other public policies in the various sectors of activity, budg-etary and actuarial projections, among other aspects, depend on these.<br />\nHowever, the development of Sizing by the technical team of the Human Resources Recruitment and Selection Division, of the Human Resources Department of SEAP, is unfeasible, considering the insufficient number of existing technicians to carry out the work, the diversity of the activities developed, as well as the high specialization, fun-damental for such assignment.<br />\nIn view of the above, it is necessary to hire a human resources consulting company to develop and implement a Workforce Sizing methodology, based on pre-existing models and/or models developed specifically for agencies and entities of the Direct Administra-tion and Autonomous Agencies, structured in an information technology system that allows its management and continuous monitoring.</p>\n\n<p>3.&nbsp; &nbsp; &nbsp;OBJECTIVES<br />\n3.1.&nbsp; &nbsp; &nbsp;GENERAL OBJECTIVE<br />\nContract the elaboration and implementation of a Sizing methodology, based on pre-existing models and/or models developed for this purpose, and a Workforce Adequacy Plan (replacement, expansion and optimization) for the agencies and entities of the Direct Administration and Autonomous Agencies of the State of Paran&aacute;, in accordance with the structures contained in the ANNEX I and ANNEX II of this Term, which provide subsidies for the admission policy for the short, medium and long term, based on the identification of a sufficient and adequate number of civil servants so that the agencies can deliver the public services that are their responsibility quickly and efficiently, and also an information technology system that includes the means for their continuous management and monitoring.</p>\n\n<p>3.2.&nbsp; &nbsp; &nbsp;SPECIFIC OBJECTIVES<br />\n3.2.1.&nbsp; &nbsp; Survey of the current situation of the existing workforce in the agencies, from a qualitative, quantitative and cost perspective, by type of employment relationship, position/function, with emphasis on the activities performed, as well as the respective institutional data, such as characterization, objectives and organizational structure. Factors with potential impact on the dimensioning of the workforce should also be surveyed, such as information regarding turnover, absenteeism, absences, seasonal demand, pent-up demand, overestimated demand, deviations from function and their effects on performance and productivity.</p>\n\n<p>3.2.2.&nbsp; &nbsp; Qualitative and quantitative dimensioning of the necessary human resources, by type of link, position/function, to the agencies and entities of the Direct Administration and Autonomous Agencies&nbsp; of the Executive Branch indicated in Annex I of this Term, developing methodologies, based on the prospecting of existing models in Brazil and abroad, adopted in public and/or private administration, types of activities, implemented on a similar or larger scale, legislation applied to the sector and/or definition of specific parameters, taking into account the current and future scenario of the State of Paran&aacute;.</p>\n\n<p>3.2.3. Plans for:<br />\n3.2.3.1. Adequacy (replacement, expansion and optimization) of the workforce, based on the need indicated in the dimensioning versus the quantity indicated in the survey of the current situation, for the short term: zero to two years, medium term: 3 to 5 years and long term: 6 to 10 years, which includes suggestions for adjustments and measures to be adopted and considers replacement rates, cost projections, the State&#39;s budgetary capacity and the potential to meet demand through the expansion of vacancies in current public examinations; and<br />\n3.2.3.2. Institutionalization of workforce planning within the scope of the Direct Administration and Autonomous Agencies&nbsp; of the Executive Branch that establishes the organization and functioning of the processes that constitute it, as well as the governance and management mechanisms for the continuous implementation and improvement of the program.<br />\n3.2.4. Project Communication Plan, as detailed in subitem 5.4.1, for each target audien-ce and for each product generated throughout the project, and Training of those invol-ved in the project, as described in subitem 5.4.2, with the purpose of ensuring its execu-tion from start to finish, its subsequent replication and continuous use, covering human resources technicians and managers, strategic managers, IT professionals designated by the Information and Communication Technology Company of Paran&aacute; &ndash; Celepar, and the Project Executive Group, for the assimilation of the developed methodology and the monitoring of its application.<br />\n3.2.5. Formulation and implementation of a system using information technology, appli-ed to Workforce Sizing &ndash; Development of information systems compatible with the sys-tems used in the State of Paran&aacute;, which will enable permanent support for the execution, processing, and diagnosis of workforce sizing, with an estimate of the respective costs.</p>\n\n<p>The details of each specific objective are presented in item &ldquo; 5. PRODUCTS INCLUDED IN THIS TERM&rdquo;.</p>\n\n<p><br />\n4. GENERAL GUIDELINES AND SCOPE&nbsp;</p>\n\n<p>This Workforce Sizing project shall include the Agencies/Entities of the Direct Administration and Autonomous Agencies (Annex I), headquartered in the capital and/or in the interior of the state, according to their location and respective regionalized structure.</p>\n\n<p>Likewise, the products to be developed within the scope of the project, as per Table 2, shall cover all the Agencies/Entities covered (Annex I), careers/career cadres with respective positions/functions, which have not been declared extinct upon becoming vacant (Annex II). It should be noted that possible changes in the organizational structure and/or careers/career cadres due to new state management guidelines implemented after the publication of this Term shall be considered and incorporated. Consider the updated version of Annexes I and II at the time of the contract.</p>\n\n<p>4.1. WORKFORCE&nbsp;</p>\n\n<p>Table 1 - Total workforce size</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:299px; width:615px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:265.0pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p><strong>Qty.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>Effective civil servants (civil and military)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>113,600</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>Unlinked commissioned positions</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>3.239</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>Special Regime Contracts (temporary)*</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>4,940</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>Interns (Middle and Higher Levels)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>2.606</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>Others (CLT)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>658</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:265.0pt\">\n\t\t\t<p>TOTAL</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:bottom; width:48.0pt\">\n\t\t\t<p>125,043</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Source: RHPARANA META4 &ndash; January/2025 base</p>\n\n<p>* The number of temporary contracts for January is atypical, as it is a school break period and does not include teachers in Basic Education. The average for the school term is around 25,000.</p>\n\n<p>&nbsp;</p>\n\n<p>4.2. METHODOLOGICAL PROPOSAL TO BE DETAILED IN THE WORK PLAN SHOULD CONSIDER THE FOLLOWING ASPECTS:<br />\n4.2.1. The execution of the work may adopt different methodologies in relation to the surveys and analyses provided for in the other products: (i) activities whose dynamics and typology allow the establishment of productivity and performance parameters, in final activities of service provision, regional or sectoral administration, such as Regional Health, Hospitals, Socio-Education Centers, Regional Education Offices, Instrumental Units, among others; (ii) activities related to management, advisory, formulation of pu-blic policies, and regulation, in which the nature of the activities presents complexity in establishing parameters for the comparison of productivity and performance, in view of the diversity of processes.<br />\n4.2.2. Parameters may be established for the workforce necessary to meet the current and future demands of the State, in accordance with the methodological proposal and products to be developed under this Term.<br />\n4.2.3. Due to the scope of the universe of analysis, the methodology and execution of the work shall adopt the following Strategic Lines of Action of the State: a) Health; b) Justice, Rights; c) Urban and Economic Development; d) General Government Adminis-tration; e) Education. It is emphasized that, in the development of the products, priority shall be given to the Health area. Regarding the Strategic Lines of Action of the State, their delimitation will be confirmed prior to the preparation and execution of the Work Plan. Within the scope of the Universities, only University Hospitals &ndash; UHs will be con-sidered, which will be included in the Strategic Line of Health.<br />\n4.2.4. The Methodological Proposal, including in the data collection and definition of parameters, may, subject to the Client&rsquo;s approval, be developed through the establish-ment of stratified and representative samples in each area, agency, or career cadre, pro-vided that there is a high degree of standardization of processes.<br />\nBoth the Workforce Sizing of the Ideal career cadre (Phase 2) and the Planning for the Adequacy of the Workforce (Phase 3) shall show the number of positions/functions cur-rently provided for in the careers, for which, according to the diagnosis carried out (Phase 2), the lack of necessity is found, or recommendations are made in terms of care-er or employment relationship. The products presented shall consider the possibility of optimizing the existing career cadre and career structures. If necessary, new functions shall be proposed considering the profile and qualifications required to meet unmet de-mands, as well as indicating the possibilities and/or need for the relocation and retrai-ning of existing professionals.</p>\n\n<p>&nbsp;</p>\n\n<p>5. PRODUCTS INCLUDED IN THIS TERM</p>\n\n<p>Table 2 - Products included in this Terms of Reference</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:198px; width:962px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:54.6pt\">\n\t\t\t<p><strong>PHASE</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.6pt; vertical-align:top; width:370.15pt\">\n\t\t\t<p><strong>PRODUCT</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:19.05pt; width:54.6pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:19.05pt; vertical-align:top; width:370.15pt\">\n\t\t\t<p>WORK PLAN</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:54.6pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:370.15pt\">\n\t\t\t<p>SURVEY OF THE CURRENT SITUATION AND SIZING OF THE WORKFORCE</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:54.6pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:370.15pt\">\n\t\t\t<p>ADEQUACY PLAN (REPLACEMENT, EXPANSION AND OPTIMIZATION) FOR THE SHORT, MEDIUM AND LONG TERM AND WORKFORCE PLANNING INSTITUTIONALIZATION PLAN</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:54.6pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:370.15pt\">\n\t\t\t<p>COMMUNICATION AND TRAINING PLAN FOR MANAGERS OPERATING IN THE TECHNICAL AND HUMAN RESOURCES MANAGEMENT AREAS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:54.6pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:370.15pt\">\n\t\t\t<p>FORMULATION AND IMPLEMENTATION OF INFORMATION TECHNOLOGY SYSTEMATICS APPLIED TO WORKFORCE SIZING &ndash; DEVELOPMENT OF INFORMATION SYSTEMS.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>5.1. PHASE 1: WORK PLAN</p>\n\n<p>Prior to the development of the work, a document describing the Work Plan for executing the purpose of this terms shall be submitted for approval by the Executive Group responsible for monitoring the services.</p>\n\n<p>In order to prepare the Work Plan, with the aim of supporting the contractor, a technical meeting will be held with the Executive Group to pass on available information summarized as to the organizational structure, current data, current panorama of human resources management, number of employees, reports that are part of the database of the State&#39;s human resources management systems, relevant legislation, career cadre , professional profiles, interlocutors involved and expectations regarding the work. Additional information may be made available to the consulting firm, upon express request, at least 15 (fifteen) business days in advance. If the information provided is considered insufficient by the contractor, the contractor shall provide other information that it deems relevant from other sources by its own means.</p>\n\n<p>The Work Plan shall present:<br />\n-&nbsp; &nbsp; Report containing a detailed description of the methodological proposal to be adopted, specifying the model parameters, variables required for data analysis, indicators, among other elements necessary for a better understanding and approval of the methodology to be applied.<br />\n-&nbsp; &nbsp; Tool, made available by the contractor, which will be used for project governance during its execution.<br />\n-&nbsp; &nbsp; Physical and financial schedule with all activities to be developed and their respective costs and durations, compatible with the deadlines established by the Client, in a sequence that considers the precedence and dependency relationships between activities. The physical and financial schedule shall present the project milestones and define the dates and costs of the deliveries of intermediate and final products for each project activity. Any changes shall be approved by the Client.<br />\n-&nbsp; &nbsp; Quality and Risk Management Plan containing a detailed description, by project activities, of the quality assurance process and compliance of the project products based on the Technical Specifications of this Term of Reference. The quality and Risk Management plan shall include the Risk Matrix, including planned, corrective and predictive actions.<br />\n-&nbsp; &nbsp; Project Communication Plan indicating the different approaches between the management, coordination, technical and target audience levels of the surveys in each agency/entity as set out in Annex I, as well as between those responsible for the product in the Contractor and the Client; the communication strategies adopted for each product and interested parties at the internal and external levels. It shall include the plan for monthly and extraordinary project monitoring meetings, methods of recording the product (minutes, emails and other documents), constituting an integral part of the official product documentation and to be followed.<br />\n-&nbsp; &nbsp; Documents and forms to be used in data collection and interview scripts, both those planned with directors and intermediate-level managers, as well as, if applicable, an indication of the applications and/or platforms used.<br />\n-&nbsp; &nbsp; Schedule with estimated dates for technical visits and/or online meetings through an application or service with the possibility of sharing presentations and files via the web with the Agencies, located in the Capital and in the interior of the State, for data collection and application of interviews, which can be carried out remotely or through digital forms.<br />\n-&nbsp; &nbsp; Technical team allocated and the organizational chart defined for the project, containing the Responsibility Matrix and the functions to be performed by each technical manager, identifying the management and coordination levels of each project activity.</p>\n\n<p>The Contractor shall describe in the project plan the approach envisaged for the development of the project, and its representation in the schedule details, considering the possibility of using multiple project deliveries, including a possible agile approach, compatible with the maturity stages of the methodology and its application throughout the contractual period. In these delivery stages, all types of products shall be considered, including artifacts provided for in the Information System.</p>\n\n<p>It is important to emphasize that, with regard to Phase 4 (Training), in addition to the items provided above, this Work Plan shall include: (i) the content to be covered in each training session; (ii) the objectives and details of the program; (iii) the methodologies and didactic-pedagogical strategies to be used; and (iv) workload.<br />\nThe Work Plan and project management shall be aligned with the project management method principles of the Project Management Body of Knowledge (PMBOK) / Project Management Institute (PMI), covering the following knowledge areas: project integration management; project scope management; project time management; project quality management; project human resource management; project communication management; project risk management.</p>\n\n<p>In relation to Phase 5 &ndash; Formulation and Implementation of an Information Technology System Applied to Workforce Sizing &ndash; Development of Information Systems, the actions/activities to be described in this Work Plan shall cover the major stages of system development, since the preparation of the System Project Plan (Annex III) is foreseen.</p>\n\n<p>Once the Work Plan is approved, the consultancy will begin the development of the products specified below, with the preparation and submission of monthly reports on the monitoring/execution of actions/activities to the Project Executive Group being mandatory.</p>\n\n<p>&nbsp;</p>\n\n<p>5.2. PHASE 2: SURVEY OF THE CURRENT SITUATION AND SIZING OF THE WORKFORCE</p>\n\n<p><br />\n5.2.1.&nbsp; &nbsp; &nbsp;Survey of the Current Situation</p>\n\n<p>Currently, the State workforce is made up of statutory employees (civil and military), employees with CLT contracts, commissioned positions without a contract, temporary contracts under a special regime, interns and outsourced service provision contracts.</p>\n\n<p>In parallel with the workforce survey, in order to understand the current and future scenarios and challenges of the different segments, it is necessary to approach the strategic management level of each agency, through structured interviews that can be conducted in person or remotely. The interviews should enable the mapping of seasonal demands[5]&nbsp; and pent-up demands due to the lack of employees, the need for better qualification of professionals, or increased investment in information technology, in order to ensure the achievement of the results established in the government goals and programs quickly and efficiently.</p>\n\n<p>It is necessary to carry out a survey of the current situation of the workforce of the agencies, the structure of careers, attributions and other pertinent information, pointing out the distortions, deficiencies and problems identified, through the presentation of a consolidated diagnosis by agency and area of activity.<br />\nThe activities listed below constitute a reference model, which may be adapted, as well as supplemented with others by the Contractor, depending on the methodology adopt-ed, provided they are approved by the Client.<br />\n5.2.1.1.The survey of the current situation from a qualitative and quantitative point of view of the current situation of the workforce by career cadre/career and by agency of the Direct Administration and Autonomous Agencies should present, whenever possible, based on the data made available by the state and collected throughout the project, an estimate of current costs and should cover:<br />\n5.2.1.1.1. Survey and analysis of the current workforce in agencies/entities: quantity by type of employment relationship, career cadre, position/function and unit, with emphasis on the activities performed;<br />\n5.2.1.1.2. Survey, identification and analysis of the organizational structure of all Agencies/Entities that make up the Direct Administration and Autonomous Agencies according to the level of activity of the organizational structure, covering regional structures;</p>\n\n<p>5.2.1.1.3. Survey of legally established competencies, competencies intrinsic to the execution of the public service, and organizational goals of the Agencies/Entities subject to the dimensioning to be carried out according to the levels of action of their organizational structure, covering regional structures;</p>\n\n<p>5.2.1.1.4. Survey and analysis of available productivity data, individually and comparatively, in the case of units that have a similar service profile, providing, when possible, indicators for the subsequent preparation of action plans to improve productivity (for example, a plan for training employees, standardization of processes, automation of activities, need to improve technological conditions, including the use of information systems and application of artificial intelligence, etc.);</p>\n\n<p>5.2.1.1.5. Survey of information regarding turnover, absenteeism, absences, seasonal demand, pent-up demand, overestimated demand, deviations from function and their impacts on performance and productivity, as well as on the state public budget;</p>\n\n<p>5.2.1.1.6. Mapping of existing jobs in agencies/entities, by type: in-person, hybrid and teleworking, with a breakdown of the levels of operational units in their organizational structure;</p>\n\n<p>5.2.1.1.7. Conducting interviews with directors, managers, deans or key employees of the agencies/entities to learn about their vision and current and future challenges. The objective of these interviews is to identify the strategic role played by the State area and its vision for the future, taking into account social and economic changes, changes in labor and social security systems, technological and work processes innovations, and their respective impacts on the demand for the workforce, both qualitatively and quantitatively;</p>\n\n<p>5.2.1.1.8. Structured interviews with managers, those responsible, deans or reference employees of the agencies to identify and analyze priority demands, repressed demands, difficulties, distortions, critical issues, good management practices that resulted in increased productivity, among others. This activity should occur after the training described in subitem 5.4.2.1.;</p>\n\n<p>5.2.1.1.9. Obtaining information considered relevant to the execution of the survey and dimensioning, from the respective agencies and managers, using specific forms and structured questionnaires. This activity shall occur after the training described in subitem 5.4.2.2;</p>\n\n<p>5.2.1.1.10. Obtaining, from SEAP/DRH, macrodata relating to costs corresponding to the career cadre/careers, considering all financial advantages (bonuses, benefits, assistance, dangerousness, unhealthy conditions, among others) related to the position/function evaluated;</p>\n\n<p>5.2.1.1.11. Obtaining professional profiles for each position/function, such as education, duties, work regime, working hours, among others;</p>\n\n<p>5.2.1.1.12. Obtaining data from the HR management system and obtained through (interviews and forms), the percentage of absenteeism by function, disaggregated by career cadre, agency/entity, considering and discriminating the different causes of absence (foreseen and unforeseen);</p>\n\n<p>5.2.1.1.13. Identification of seasonal demand, pent-up demand, overestimated demand, function deviations and their impacts on performance and productivity, as well as on the state public budget, through interviews and forms by agency/entity, function.</p>\n\n<p>5.2.2. Workforce Sizing</p>\n\n<p>It is extremely important to identify, in terms of qualitative and quantitative profiles, the ideal career cadre for the functioning of the administrative units that make up the areas of State activity in the current context and over a horizon of up to 10 years.</p>\n\n<p>The sizing should be based on the identification of existing methodologies already implemented in other governments, similar studies, applied legislation and/or the development of a specific methodology for each area. The implementation of Workforce Sizing in private spheres that carry out activities that are not exclusive to the State may also be considered.</p>\n\n<p>It is important to emphasize that, as a general focus of the project, it should be considered that certain functions performed by the State are by nature exclusive to the public sector, such as the custody of inmates in socio-educational units. Others, such as those related to health and education, are carried out in both the private and public sectors, subject to the established constitutional competencies. However, for the proposals related to the Sizing of the Ideal career cadre, even in activities where the corresponding parameters are found in the private sector, it is necessary to assess whether the same parameters for sizing the workforce can be adopted, taking into account aspects of the legislation on public servants that impose some restrictions compared to other workers.</p>\n\n<p>Different strategies may be adopted for the various sectors according to the reality identified. For example, in areas and units with the same service profile, such as hospitals and schools, the sizing work can be replicated by adopting sizes. In units of the same profile and size or of equivalent size, the same dimensioning may be applied, but it shall always be aligned with the trend indicated by the demographic behavior of the state/municipalities.<br />\nAll changes to business requirements (activities, agencies, etc.) shall be parameterizable by Governance and Information Systems, when necessary, and may include:</p>\n\n<p>&bull;&nbsp; &nbsp; the creation and maintenance of the organizational structure, the definition of Organizational Units, their functions and hierarchical relationships for each institution;<br />\n&bull;&nbsp; &nbsp; workstation&nbsp; and its specific characteristics (workstation profile).</p>\n\n<p>5.2.2.1. Sizing of the ideal career cadre qualitatively (position and function) and quantitatively of the workforce of the State&#39;s Direct Administration and Autonomous Agencies, detailed by Career Cadre and by Agency/Entity consolidated in a report to be delivered to the Client, covering:</p>\n\n<p>5.2.2.1.1. Consolidation of the methodological proposal for sizing the workforce, by area of activity, based on the collection of qualitative, quantitative and cost data, analysis of indicators and application of the adopted parameters;<br />\n5.2.2.1.2. Presentation of detailed and structured documentation/Dossier by area of activity, career cadre, position and function of the methodology developed for preparing the Workforce Sizing, indicating the parameters used, indicators and other information pertinent to the data modeling used;<br />\n5.2.2.1.3. Identification of which Agencies/Entities, based on a comparison of the proposed ideal sizing and the existing staff, are oversized, undersized, or have the correct sizing, but with an imbalance between the levels of activity of their organizational structure, covering the regions;</p>\n\n<p>5.2.2.1.4. Proposal of strategies aimed at optimizing human, material, financial and budgetary resources that include, among others:<br />\na) adjustments to the composition of the workforce, in terms of profile, hiring method, modernization and restructuring of career cadre, including recommendations for the elimination, creation or reformulation of positions and/or functions;<br />\nb) modernization of management through review of processes, investment in information technology, including the use of information systems and application of artificial intelligence, change in the way services are offered (digital and others);<br />\nc) adoption of the Teleworking regime[6];<br />\nd) indication of distortions, deficiencies and problems found and recommendation of the necessary interventions to solve them;<br />\ne) guidelines for developing a staff training plan;<br />\nf) Possibility of alternative service provision models that consider, among other possibilities, partnerships with the third sector, public-private partnerships and outsourcing.</p>\n\n<p>5.2.2.2. Main Activities for Execution:<br />\nThe activities listed below are a reference model and may be adapted or others added by the Contractor, depending on the methodology adopted, provided that they are ap-proved by the Client.<br />\n5.2.2.2.1. Identification of existing workforce sizing parameters, methodologies and studies.<br />\n5.2.2.2.2. Identification and definition of indicators and parameters to be adopted by the proposed methodology.<br />\n5.2.2.2.3. Proposals for measures to meet seasonal demands with quality, by level of activity of the organizational structure of the Agencies/Entities.<br />\n5.2.2.2.4. Analysis of the demographic behavior of the State and Municipalities and corresponding impact on the demand for services, with scenarios for the short, medium and long term, as covered in Phase 3.<br />\n5.2.2.2.5. Consolidation of the survey of workforce sizing methodologies, by area of activity, based on the survey of qualitative, quantitative and cost data, analysis of indicators and application of the adopted parameters;<br />\n5.2.2.2.6. The results obtained in the two sub-products, Survey and Sizing, shall be included in reports containing the reality found and the proposals related to Sizing in each of the Agencies/Entities, as well as, when possible, the disaggregation by their levels of action[7]. A summary report shall also be prepared, establishing a scenario of the State, where the predominant situations verified and their respective proposals will be listed.</p>\n\n<p>5.3. PHASE 3: WORKFORCE ADEQUACY PLAN (REPLACEMENT, EXPANSION AND OPTIMIZATION) FOR THE SHORT, MEDIUM AND LONG TERM AND WORKFORCE PLANNING INSTITUTIONALIZATION PLAN<br />\nOnce the Survey of the Current Situation and the Sizing of the Ideal Career Cadre have been completed, the deficit and surplus areas should be identified, indicating the necessary interventions, which may include, in addition to replacing or increasing the number of employees, the restructuring of work processes, requalification, reassignments or reformulation of the service contracting method.</p>\n\n<p>Next, a workforce adequacy plan (replacement, expansion and optimization) shall be drawn up, establishing the need to recruit employees and the respective cost forecast for the short, medium and long term, considering the expected recruitment resulting from replacement rates and projection of State revenues and expenses, by agency/entity, in accordance with the Career Cadres, Positions and Functions, taking into account the potential for using a reserve list in current public competitions and the limits established in Complementary Law No. 101, Fiscal Responsibility Law.<br />\nShort term - zero to 2 years;<br />\nMedium term - 3 to 5 years;<br />\nLong term - 6 to 10 years.<br />\n5.3.1. The Adequacy and Implementation Plan for Replacement, Expansion and Optimization<br />\n5.3.1.1. The Plan to be delivered to the Administration shall:<br />\n5.3.1.1.1. Demonstrate the losses to the full execution of public services and the resulting risks, in the event that the replacement indicated as necessary is not carried out;</p>\n\n<p>5.3.1.1.2. Identify services compromised due to lack/shortage of human resources;</p>\n\n<p>5.3.1.1.3. Present a comparison of personnel expenses, in different workforce replacement scenarios, and the agency&#39;s budget availability for personnel expenses;</p>\n\n<p>5.3.1.1.4. Present a report assessing the projection of demand for services provided, detailed by Career Cadre, Agency/Entity of the State&#39;s Direct Administration and Autonomous Agencies, for the next 2, 5 and 10 years, considering the expectation of layoffs and implementation of the replacement rate in the same periods and the prospect of advances in management performance resulting from the implementation of the measures indicated in the survey carried out and in the proposed dimensioning;</p>\n\n<p>5.3.1.1.5. Propose the adoption of strategies that consider the potential use of the reserve list of current public selection processes as well as the proposals highlighted in item 5.2. 2, aiming at the optimization of human, material, financial and budgetary resources; and</p>\n\n<p>5.3.1.1.6. Foresee the possible impact on the number of career cadre when proposing to adopt new hiring processes provided for in item 5.2.2.<br />\nThe analyses and results obtained from the above items shall be included in specific reports for each of the agencies/entities, as well as the breakdown by their levels of activity. A summary report on the State shall also be presented, consolidating the overall analysis.<br />\n5.3.1.2. Main Activities for Execution:<br />\nThe activities listed below constitute a reference model, which may be adapted, as well as supplemented with others by the Contractor, depending on the methodology adopted, provided they are approved by the Client.<br />\n5.3.1.2.1. Analysis of the demographic behavior of the State and Municipalities and corresponding impact on the demand for services, with scenarios for the short, medium and long term.<br />\n5.3.1.2.2. Projection of demand by agency/entity broken down by career cadre, Positions and Functions and consolidated by strategic line of State action (e.g.: health, education, management, among others), for 2, 5 and 10 years.<br />\n5.3.1.2.3. Projection of layoffs by position/function in the period, considering the different areas of activity under analysis.<br />\n5.3.1.2.4. Forecast of income resulting from the application of replacement rates.<br />\n5.3.1.2.5. Survey of current public selection processes&nbsp; with the potential to meet demand.<br />\n5.3.1.2.6. Obtaining and analyzing historical budget data from the state administration.<br />\n5.3.1.2.7. Projection of server entry and maintenance costs.<br />\n5.3.1.2.8. Analysis of the impact of the proposed measures as set out in subitem 5.2.2.1.4. of subitem 5.2.2.</p>\n\n<p>5.3.2. The Workforce Planning Institutionalization Plan<br />\n5.3.2.1. The Plan to be delivered to the Administration shall:<br />\n5.3.2.1.1. Propose the management instance and the structure necessary for the implementation of workforce planning, which includes processing the sizing, comparison with the existing workforce, adoption of strategies and schedule for workforce adequacy, monitoring of the results obtained and other routines for periodic updating.<br />\n5.3.2.1.2. Establish the processes that make up workforce planning and the respective flows.</p>\n\n<p><br />\n5.4. PHASE 4: COMMUNICATION AND TRAINING PLAN FOR MANAGERS WORKING IN THE TECHNICAL AREA AND PEOPLE MANAGEMENT.<br />\n5.4.1. Project Communication Plan and Execution<br />\nThe Communication Plan will be developed prior to the start of the project and implemented throughout the entire life cycle. This plan aims to promote fluidity, coherence and effectiveness of communication among all stakeholders, respecting the different levels of responsibility and interest - managerial, coordination, technical and other stakeholders. It should also indicate specific approaches for each target audience in the agencies/entities, as set out in Annex I, and for each product generated throughout the project. It should include the plan for monthly and extraordinary meetings to monitor the project. between those responsible for the product at the Contractor and the Client, communication material and presentations, product recording methods (minutes, emails and other documents), constituting an integral part of the official product documentation to be followed at each stage of the project until completion. It shall also act in external communication by preparing materials for unions, the press, digital media and other dissemination channels relevant to the scope of the project.<br />\n5.4.2 Training<br />\nThe training will consist of events to be conducted at different times, as detailed below.<br />\n5.4.2.1. Carrying out at least 07 (seven) workshops with a minimum workload of 08 (eight) hours.<br />\nThe workshops, with a maximum of 40 (forty) participants each, aim to promote preliminary awareness in order to train and equip managers and technicians working in the area of human resources management, regarding the assumptions and foundations of the Management Model for Results in line with the object addressed in this Term. This training should address: (i) contextualization of the current economic scenario and its long-term projection; (ii) reflection on the role of the State and the trends for human resources management in the public sphere; (iii) presentation of the work schedule to be used in the project (in accordance with Phase 1 &ndash; Action Plan); (iv) description of the actions/activities involving the areas of human resources management.<br />\nThe Contractor is responsible for providing consultant(s) with compatible training, knowledge of the economic situation of international and national public administration and the socioeconomic reality of the State of Paran&aacute;, as well as skills in leading participants to reflect on the importance of each segment in meeting the set of demands of society.<br />\n5.4.2.2. Carrying out training, in each agency, for the employees who will work directly in the Survey stage (5.2), with the aim of ensuring that the information is passed on in an objective and appropriate manner, with a workload of around 8 (eight) hours.<br />\n5.4.2.3. Holding of 01 (one) Seminar, with a minimum workload of 04 (four) hours, and 02 (two) Workshops, with a minimum workload of 16 (sixteen) hours.<br />\nHolding a Seminar, with a minimum workload of 4 hours, for the Government&#39;s Strategic Center and the Project&#39;s Executive around 50 participants in each workshop system developed for application of the sizing methodology; (v) presentation of the proposal for training on the operationalization of the system and its functionalities, based on a guidance manual and tutorials; (vi) presentation of suggestions and proposals that provide for the maintenance of the system and the longevity of the methodology developed.<br />\nThe Contractor is responsible for providing a consultant to carry out the events included in this Product, who shall be an integral member of the key team, in addition to having communication and leadership skills and ability to conduct meetings with intermediate and strategic management levels.<br />\n5.4.2.4. Carrying out at least 01 (one) training course on the operation, administration and architecture of the Computerized System with a minimum workload of 24 (twenty-four) hours.<br />\nThis training shall be planned and conducted by the Contractor and aimed at addressing the system administration functions, with the objective of training the technicians working at SEAP (approximately 20 staff members) to operate and maintain the solution. At the end of the training, users should be able to use the system functions, also understanding its overall operation, to become agents for multiplying this knowledge within the agencies, and to recognize all modules and functions; define user types, granting different access levels; implement and parameterize the system, including the maintenance of indicators and calculation formulas, change tables, include new users, among other knowledge necessary to maintain the system&#39;s operability.<br />\nAt a specific moment of the aforementioned training, technicians from Celepar or another institution responsible for the State of Paran&aacute; system will be present so that the contractor can provide the knowledge that enables a structural view of the system, its components (programs, database and other tools), as well as mastery of the development environment, without prejudice to the specific training indicated in Annex III, in order to enable technology transfer.<br />\n&nbsp;<br />\n5.5. PHASE 5: FORMULATION AND IMPLEMENTATION INFORMATION OF TECHNOLOGY SYSTEMATICS APPLIED TO WORKFORCE SIZING &ndash; DEVELOPMENT OF INFORMATION SYSTEMS.<br />\nThe importance or need for the application of information technology in Workforce Sizing programs lies precisely in the possibility of having a system that allows for permanent support for Human Resources management &ndash; in a timely manner and with reliable information &ndash; within parameters that allow for the provision of stability diagnostics between the demand for human resources and the availability of personnel, respecting their requirements, characteristics and skills. Systematically monitoring the impacts caused by permanent situations such as employee layoffs, especially retirements, and greater demand from society for improvements or expansion of certain services (e.g. health, education, etc.). Once the sizing parameters have been defined, the system will indicate the possible need for adjustments to the career cadre. Likewise, these diagnostics are influenced by temporary situations such as vacations, leaves and other types of absences of public servants.</p>\n\n<p>To achieve the main objective of the project, it is essential to ensure the continued application of the methodology, in order to direct efforts towards maintaining a human resources structure that meets the strategic objectives of the State, which are dynamic. At the same time, it is essential that the public administration takes ownership of the methodology and algorithms, as well as the data captured and the results of the project, generating continuous changes in work processes that will enable the optimization of human resources and public administration costs.</p>\n\n<p>Thus, the development of an information system, in the context of the project, is justified by the need for appropriation and continued application of the methodology/algorithms and dimensioning data, since the parameters and indicators defined by area of activity (e.g. service provision in the health and socio-educational areas), as well as other data related to the workforce of the agencies and entities (e.g. total number of positions by employment relationship, education, admissions, dismissals, absences, absenteeism), budgetary capacity, among other information, shall be updated systematically and routinely.</p>\n\n<p>However, it is important to emphasize that the perfect adherence of the system to be developed, to the RH- Paran&aacute;/Meta4 System, used by the State for payroll and functional registration management, is a sine qua non, consisting of a mandatory requirement. In other words, the system to be contracted shall be independent and capable of interacting with the RH-Paran&aacute;/Meta4 System and, if necessary, others used by the State.&nbsp;</p>\n\n<p>In this context, the computational routines to be developed through an Information System shall be capable of storing and systematizing the collected data, representing the defined methodology through algorithms and providing the necessary results through queries, reports and panels, through a human interface with usability appropriate to the users of the Information System. The fundamental requirements, which may be complemented based on the definition of the proposed Methodology, are listed in ANNEX IV - List of Requirements for the DIMFT Information System.<br />\n5.5.1. Information Technology Systematics Applied to Workforce Sizing &ndash; Development of Information Systems.<br />\nThe definition of the products to be developed meets the guidelines and technological compatibility of the State of Paran&aacute;, having been established in conjunction with the Companhia de Tecnologia da Informa&ccedil;&atilde;o e Comunica&ccedil;&atilde;o do Paran&aacute; - Celepar, as detailed in ANNEX III, which includes, among others, the specification of the technological environment for the operation of the System and the definition of the criteria to be used for the full implementation of the products that make up this Phase.</p>\n\n<p>5.5.1.1. System Project Plan<br />\nThe general Work Plan of the project shall be complemented and detailed with the spe-cific activities for the elaboration and implementation of the Information System.<br />\nThe approach to be used in the Information System project shall be compatible with the overall project approach, including the possibility of multiple iterations and an agile ap-proach. The activities listed in ANNEX III primarily aim to define a set of typical Soft-ware Engineering artifacts, without being limited to specific development models to be adopted. The approach strategy to be adopted for the project as a whole, and conse-quently for the software, shall define the development model to be used in the project, while taking into account the delivery of the products scheduled in the timeline de-scribed in item 6 &ndash; PHYSICAL-FINANCIAL EXECUTION SCHEDULE OF THE PRODUCTS:<br />\n&bull;&nbsp; &nbsp; System Project Plan<br />\n&bull;&nbsp; &nbsp; Business Process Modeling<br />\n&bull;&nbsp; &nbsp; Data Load Module<br />\n&bull;&nbsp; &nbsp; Sizing Module<br />\n&bull;&nbsp; &nbsp; Global Integration (final delivery)<br />\nThe System Project Plan shall be the first product of this phase to be delivered by the Contractor and shall be approved by the Project Executive Group and Celepar. The oth-er products define a perspective of executable product deliveries that support the activi-ties of Workforce Survey, Workforce Sizing, Workforce Adequacy, and Institutionaliza-tion of Workforce Planning.<br />\nThe detailed activities planned for the execution of the above products are provided in ANNEX III.</p>\n\n<p>5.5.1.2. Business Process Modeling<br />\nFor the execution of this product, the necessary activities and tasks for the system de-sign shall be considered, including the mapping and modeling of processes inherent to the sizing methodology, which will later serve as the basis for the entire design and specification of the Information System.Activities related to the execution of the fol-lowing sub-products shall be developed:(i) Process Mapping Document relating to the methodology defined for Workforce Sizing;(ii) Consolidation Document of the Process-es of the Workforce Sizing System (DIMFT), which will be part of the software solution scope.The technical reference for executing the activities for product delivery can be obtained in ANNEX III, essentially in its item 2.2. Business Process Modeling.<br />\n5.5.1.3. Data Load Module<br />\nThis product will be characterized by the operational delivery of the Information System functionalities that support the Workforce Survey activities, within their processes de-fined as part of the software solution scope, and which will also constitute the databases later used in the other activities provided in the methodology.The technical reference for executing the activities for product delivery can be obtained in ANNEX III, essentially in its items 2.2. CONCEPTION AND ELABORATION and 2.3. INTEGRATION AND QUALIFICATION.<br />\n5.5.1.4. Sizing Module<br />\nThis product will be characterized by the operational delivery of the Information System functionalities that support the Workforce Sizing activities, within their processes de-fined as part of the software solution scope.The technical reference for executing the activities for product delivery can be obtained in ANNEX III, essentially in its items 2.2. CONCEPTION AND ELABORATION and 2.3. INTEGRATION AND QUALIFICATION.<br />\n5.5.1.5. Global Integration (final delivery)<br />\nThis product will be characterized by the operational delivery of the Information System functionalities that support the activities for the implementation of the Workforce Ad-justment Plan and the Institutionalization of Workforce Planning, according to the pro-cesses defined as part of the software solution scope. In addition to this specific deliv-ery, all other activities and deliveries scheduled for the completion of the Information System, as well as the services planned during the Assisted Operation and Technical Maintenance and Support periods, shall be included in this product delivery.The tech-nical reference for executing the activities for product delivery can be obtained in AN-NEX III, essentially in its items: 2.2. CONCEPTION AND DEVELOPMENT, 2.3. INTEGRATION AND QUALIFICATION, 2.4. TRANSITION, 2.5. SOURCE CODE, 2.6. DOCUMENTATION, 2.7. TECHNOLOGY TRANSFER, 2.8. IN-TEGRATED ENVIRONMENT ACCEPTANCE, 2.9. MAINTENANCE AND TECHNICAL SUPPORT, 2.10. SYSTEM OPERATION INFRASTRUCTURE SPECIFICATION, and 2.11. PREPARATION OF DEVELOPMENT, AC-CEPTANCE, AND PRODUCTION ENVIRONMENTS.</p>\n\n<p>&nbsp;<br />\n6.&nbsp; &nbsp; &nbsp;PHYSICAL-FINANCIAL EXECUTION SCHEDULE OF PRODUCTS<br />\nThe following schedule may be adapted depending on the details of the Work Plan, respecting the maximum time foreseen, from the signing of the contract, for the completion of the work.</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:1501px; width:1626px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"26\" style=\"background-color:#8db3e2; height:15.75pt; width:1027.95pt\">\n\t\t\t<p><strong>MONTHS</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"background-color:#d9e2f3; height:15.75pt; width:390.05pt\">\n\t\t\t<p><strong>PHASE/PRODUCT EXECUTION SCHEDULE</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>1&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>2&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>3&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>4&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>5&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>6&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>7&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>8&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>9&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>10&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>11&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>12&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>13&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>14&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>15&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>16&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>17&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>18&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>19&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>20&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d9e2f3; height:15.75pt; width:1.0cm\">\n\t\t\t<p>21&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>TOTAL&nbsp;&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:49.6pt\">\n\t\t\t<p><strong>PHASE 1&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p><strong>PRODUCT 1 &ndash; WORK PLAN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p><strong>PHASE 2&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"24\" style=\"height:15.0pt; width:936.7pt\">\n\t\t\t<p><strong>PRODUCT 2 &ndash; CURRENT WORKFORCE SURVEY AND WORKFORCE SIZING</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.2.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.0pt; width:298.8pt\">\n\t\t\t<p><strong>Current Workforce Survey</strong>.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:42.55pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.2.1.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">Survey stage 1 - 50% of the Agencies - Annex I Report of Agencies/entities<br />\n\t\t\tof Direct Administration and Autonomous Agencies.</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:42.55pt\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.2.1.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">\n\t\t\t<p>Survey stage 2 - 50% of the Agencies - Annex I Report of Agencies/entities<br />\n\t\t\tof Direct Administration and Autonomous Agencies.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:42.55pt\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.2.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p><strong>Workforce Sizing</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>12%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>12%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"3\" style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p><strong>PHASE 3&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.3</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"24\" style=\"height:15.0pt; width:936.7pt\">\n\t\t\t<p><strong>PRODUCT 3 &ndash; WORKFORCE ADEQUACY AND WORKFORCE PLANNING INSTITUTIONALIZATION PLAN</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.3.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">\n\t\t\t<p><strong>Workforce Adequacy Plan (Replacement, Expansion and Optimization)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>5%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:24.75pt; width:42.55pt\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.3.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">\n\t\t\t<p><strong>Workforce Planning Institutionalization Plan</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>5%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"8\" style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p><strong>PHASE 4&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.4</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"24\" style=\"height:15.0pt; width:936.7pt\">\n\t\t\t<p><strong>PRODUCT 4 <s>- </s>COMMUNICATION AND TRAINING PLAN FOR MANAGERS WORKING IN THE TECHNICAL AREA AND PEOPLE MANAGEMENT.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p><strong>Project Communication Plan</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>5%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>5%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.1.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>Execution of the Project Communication Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"6\" style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>7%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">\n\t\t\t<p><strong>Training</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.2.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">Carrying out at least 07 (seven) workshops with a minimum workload&nbsp;<br />\n\t\t\tof 08 (eight) hours.</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4</strong>. <strong>2.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:24.75pt; width:298.8pt\">\n\t\t\t<p>Carrying out training in each agency for the Survey stage (5.2.1).</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;-</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:24.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:36.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.2.3</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:36.75pt; width:298.8pt\">Holding of 01 (one) Seminar with a minimum workload of 04 (four)<br />\n\t\t\thours and 02 (two) Workshops, with a minimum workload of 16 (sixteen) hours.</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:36.75pt; width:1.0cm\">-</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:36.75pt; width:1.0cm\">-</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:36.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.4.2.4</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:36.75pt; width:298.8pt\">\n\t\t\t<p>Completion of 01 (one) training session on the operation, administration and&nbsp;<br />\n\t\t\tarchitecture of the Computerized System with a minimum workload of 24&nbsp;<br />\n\t\t\t(twenty-four) hours.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:36.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:36.75pt; width:1.0cm\">-</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:24.0pt; width:49.6pt\">\n\t\t\t<p><strong>PHASE 5&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:24.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.5</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"24\" style=\"height:24.0pt; width:936.7pt\">\n\t\t\t<p><strong>PRODUCT 5 &ndash; FORMULATION AND IMPLEMENTATION OF INFORMATION TECHNOLOGY SYSTEMS APPLIED TO WORKFORCE SIZING &ndash; DEVELOPMENT OF INFORMATION SYSTEMS.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"24\" style=\"height:15.0pt; width:936.7pt\">\n\t\t\t<p><strong>Information Technology Systematics Applied to Workforce Sizing &ndash; Development of Information Systems.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"height:15.75pt; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1.1</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>System Project Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>4%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1.2</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>Business Process Modeling</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>4%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1.3</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>Data Loading Module</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>6%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>6%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1.4</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>Sizing Module</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>8%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>8%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:41.65pt\">\n\t\t\t<p><strong>5.5.1.5</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:15.75pt; width:298.8pt\">\n\t\t\t<p>Global Integration (final delivery)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:1.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>-</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bfbfbf; height:15.75pt; width:1.0cm\">\n\t\t\t<p>18%</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>18%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"background-color:#8db3e2; height:15.75pt; width:92.0pt\">\n\t\t\t<p><strong>PAYMENT (%)</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:298.05pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>15%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>4%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>6%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>10%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>18%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>22%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:1.0cm\">\n\t\t\t<p><strong>25%</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#8db3e2; height:15.75pt; width:42.55pt\">\n\t\t\t<p><strong>100%</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>7.&nbsp; &nbsp; FORM OF PRESENTATION AND DELIVERY OF PRODUCTS (Table 2)</p>\n\n<p>The Contractor&nbsp; shall present in the Work Plan the standard and model for structuring, referencing and organizing the project documents, which shall be analyzed and approved by the Client. This will be the standard to be followed when delivering related products (Project Documents and Project Reports).<br />\nAll documents generated (manuals, results reports, presentations of work meetings, meeting minutes, teaching and learning materials for training, etc.) shall be submitted in two printed copies (when applicable), in Brazilian Portuguese, and on a magnetic medium (HD or similar) appropriate to the volume of the submission. The digital format shall be 1 (one) copy in .pdf and 1 (one) copy in open format of the software used (Word, for example).<br />\nPrinted copies shall be bound and organized into volumes corresponding to each of the by-products and/or products described in this Term.<br />\nThe preliminary version of the documents shall be forwarded to the Executive Group 5 (five) business days in advance of the presentation, which will take place through a face-to-face meeting between the Contractor and the Client, with a minimum workload of 8 (eight) hours, for discussion and validation, with the Contractor being responsible for implementing the adjustments defined after assessment by the Client.</p>\n\n<p>The Contractor shall deliver the final version of the deliverables (e.g. documents, files) within a maximum of 5 (five) business days after the face-to-face meeting.</p>\n\n<p>The form of presentation and acceptance of the products that make up Phase 5 shall comply with the description contained in subitem 3.2 of Annex III of this Term.</p>\n\n<p><br />\n8.&nbsp; &nbsp; AVAILABLE INPUTS</p>\n\n<p>The Human Resources and Social Security Department of the Administration and Social Security Secretariat &ndash; DRH/SEAP, will provide a place for meetings, technical discussions and product presentations, as well as facilitating, within the scope of the State Administration, consultants&#39; access to information relevant to their area of activity, scheduling meetings with interlocutors from the agencies involved and, when convenient, participating in them.<br />\nThe processes, documents, data and information available for the execution of the activities to be developed, such as: reports containing the number of employees per agencyt, career cadre, position and function, organizational charts, professional profiles, rules and regulations, human resources legislation and other normative acts, indicators extracted from the State database and other data to support demand projections, will also be made available to the consulting firm upon express request, at least 15 (fifteen) business days in advance. These inputs will be made available by the DRH/SEAP or by the human resources heads of the departments involved.<br />\nThose responsible for monitoring services will be available to align actions, methods and work techniques, adapting your demands to the products to be presented by the company.</p>\n\n<p>9.&nbsp; &nbsp; EXECUTIVE GROUP RESPONSIBLE FOR MONITORING AND APPROVAL OF PRODUCTS</p>\n\n<p>The Executive Group will be formed by professionals from the Human Resources and Social Security Department of the State Secretariat for Administration and Social Security - DRH/SEAP, predominantly from the Human Resources Recruitment and Selection Division - DSRH, which is the unit responsible for centrally executing human resources management activities related to recruitment, selection, admission, assignment, and movement, as well as coordinating, guiding, and monitoring the sizing of the workforce. Employees from the advisory department and other DRH/SEAP units who have knowledge in the area of careers and remuneration may also join the Executive Group. Employees with experience in these activities will be designated to directly and continuously monitor the consultancy&#39;s work.<br />\nSpecifically, to execute Phase 5 (System/Solution Development), technicians to be appointed by the Paran&aacute; Information and Communication Technology Company &ndash; Celepar will be integrated into the Executive Group.</p>\n\n<p>10. KEY TEAM<br />\nThe key team of the Consultancy, responsible for the overall management of the project, which shall ensure the integration and compliance of the products while actively partici-pating in all stages, from the Work Plan, product development, training, and presenta-tion of results and proposals to the Client, to the system implementation, shall be com-posed of the following professionals, with minimum education and experience require-ments as follows:<br />\n(01) Specialist Consultant, who will act as Coordinator, with experience in Process Im-provement, having at least ten (10) years of proven practical experience in project man-agement, strategic planning project development, human resources management, and workforce sizing for public institutions (Autarchies and State Secretariats, Foundations). Degree and/or postgraduate studies in areas of knowledge related to the theme and products of the consultancy.<br />\n(03) Senior Consultants, with experience in Human Resources Administration or Peo-ple Management, having at least five (5) years of experience in Public Administra-tion/Management (Autarchies, State Secretariats, Foundations), complemented by expe-rience in Planning, Workforce Sizing and Management for public institutions (Autar-chies and State Secretariats, Foundations). Degree and/or postgraduate studies in areas of knowledge related to the theme and products of the consultancy.<br />\n(01) Specialist Consultant with experience in Information Technology, Systems Analy-sis, or related areas, having at least five (5) years of experience in systems analysis and software development for Public Administration/Management (Autarchies, State Secre-tariats, Foundations). Participation in at least three projects involving the processing and analysis of large datasets, with desirable experience in projects related to public sector human resources management. Proficiency in data visualization and analysis platforms (e.g., Power BI, Tableau, Qlik Sense, or similar). Proven experience in creating analytical models and preparing technical reports to support strategic decision-making.<br />\nDegree and/or postgraduate studies in Information Technology, Systems Analysis, Computer Science, or related areas. In addition to the specified technical knowledge, this consultant shall have communication skills and experience in technically leading multidisciplinary teams, considering that they will be one of the professionals responsi-ble for delivering the product specified in item 5.4.2.4.</p>\n\n<p>11. SUPPORT TEAM<br />\nAt the Contractor&rsquo;s discretion, a support team may be constituted, composed of:<br />\na) Consultants with professional education and experience in Administration, People Management, or Public Management (Autarchies, State Secretariats, Foundations) to work on activities related to data collection, formulation of indicators and parameters, and support in product development;<br />\nb) Information Technology Consultants (Systems Analysis and Development), acting as Developers with experience in Information Technology, Systems Analysis, Computer Science, or related areas, related to software development with the characteristics of the intended software;<br />\nc) Senior Consultant acting as Project Manager, with experience in Strategic Planning, having at least five (5) years of experience in Public Administration/Management (Au-tarchies, State Secretariats, Foundations). Degree and/or postgraduate studies in areas of knowledge related to the theme and products of the consultancy. This consultant will perform project management functions, with experience in areas such as Project Man-agement, IT Management, or Innovation and Technology, leadership skills, administra-tion focused on team and process management, experience working on technology pro-jects, technical knowledge of tools and technologies used in projects (e.g., development platforms, servers, database systems, IT security), management of technology teams, knowledge of Development Methodologies in project management such as PMI and PMBOK, stakeholder management, and project management tools.</p>\n\n<p>&nbsp;</p>\n\n<p>[1] Reference month January 2025.<br />\n[2] Average monthly number of layoffs from Feb/2024 to Jan/2025: retirements, dismissals, deaths and dismissals, excluding those occurring at universities.<br />\n[3] Calculation basis 113,600 effective servers &ndash; Ref. Jan/2025.<br />\n[4] Decree No. 10,313/2022.<br />\n[5] Operation summer.<br />\n[6] Law No. 19,776/2018; Decree No. 9879/2021.<br />\n[7] The following are considered as the Level of Action of the Organizational Structure (Law No. 21,352/2023) of the Agencies/Entities: Senior Management, Advisory, Management, Instrumental, Programmatic Execution, Regional.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>ANNEX I - LIST OF AGENCIES/ENTITIES OF DIRECT ADMINISTRATION AND AUTONOMOUS AGENCIES OF THE STATE OF PARAN&Aacute;</strong></p>\n\n<table cellspacing=\"0\" style=\"height:243px; width:768px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#969696; height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\"><strong>NAME OF THE AGENCY/ENTITY</strong></td>\n\t\t\t<td style=\"background-color:#969696; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\"><strong>ACRONYM</strong></td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">AG&Ecirc;NCIA DE ASSUNTOS METROPOLITANOS DO PARAN&Aacute;</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">AMEP</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">COL&Eacute;GIO ESTADUAL DO PARAN&Aacute;</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">CEP</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">CONTROLADORIA GERAL DO ESTADO</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">CGE</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">INSTITUTO PARANAENSE DE DESENVOLVIMENTO ECON&Ocirc;MICO E SOCIAL</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">IPARDES</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">INSTITUTO PARANAENSE DE DESENVOLVIMENTO EDUCACIONAL</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">FUNDEPAR</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DA ADMINISTRA&Ccedil;&Atilde;O E DA PREVID&Ecirc;NCIA</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SEAP</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DA EDUCA&Ccedil;&Atilde;O</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SEED</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DA JUSTI&Ccedil;A E CIDADANIA</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SEJU</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DA SA&Uacute;DE</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SESA</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DO PLANEJAMENTO</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SEPL</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:343pt\">SECRETARIA DE ESTADO DO TURISMO</td>\n\t\t\t<td style=\"height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:56pt\">SETU</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Detailed information about the administrative structure of the State of Paran&aacute; can be accessed at: https://www.legislacao.pr.gov.br/legislacao/pesquisarAto.do?action=exibir&amp;codAto=278128&amp;indice=1&amp;totalRegistros=1&amp;dt=14.5.2023.18.6.24.361</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>ANNEX II - NUMBER OF POSITIONS/FUNCTIONS PER CAREER CADRE</strong></p>\n\n<p>TOTAL NUMBER OF POSITIONS AND FUNCTIONS, PROVIDED FOR IN LEGISLATION, BY CAREER/EMPLOYEE STRUCTURE &ndash; 2025 SUBJECT TO SIZING (EXCEPT THOSE EXTINCT OR EXTINCT WHEN BECOMING VACANCY)</p>\n\n<table cellspacing=\"0\" style=\"height:124px; width:771px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d9d9d9; height:15.0pt; vertical-align:middle; white-space:normal; width:236pt\"><strong>CAREER CADRE/CAREER</strong></td>\n\t\t\t<td style=\"background-color:#d9d9d9; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:58pt\"><strong>POSITIONS</strong></td>\n\t\t\t<td style=\"background-color:#d9d9d9; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:71pt\"><strong>FUNCTIONS</strong></td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; height:15.0pt; vertical-align:middle; white-space:normal; width:236pt\">Executive Branch&#39;s Own Career Cadre &ndash; QPPE</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:58pt\">3</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:71pt\">44</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:236pt\">The State Health Department&#39;s own Career Cadre - QPSS</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:58pt\">2</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:71pt\">37</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:236pt\">Higher Education Institutions&#39; Own Career Cadre - IEES</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:58pt\">2</td>\n\t\t\t<td style=\"background-color:white; height:15.0pt; text-align:center; vertical-align:middle; white-space:normal; width:71pt\">14</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; vertical-align:middle; white-space:normal; width:236pt\">Teaching Own Career Cadre - QPM</td>\n\t\t\t<td style=\"background-color:white; height:15.75pt; text-align:center; vertical-align:middle; white-space:normal; width:58pt\">1</td>\n\t\t\t<td style=\"background-color:white; height:15.75pt; text-align:center; vertical-align:middle; white-space:normal; width:71pt\">2*</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Note: the number of positions and functions indicated refers to those provided for in legislation and with the possibility of entry. * The position of QPM Teacher does not include functions, however there are different responsibilities for teachers of the Matrix Curricular Components and for Pedagogues.</p>\n\n<p>IEES - Higher Education Institutions&#39; Own Career Cadres - University Hospitals will be included in the Hospitals&#39; sizing, therefore the University Technical career shall be considered, only for functions compatible with the hospital area.</p>\n\n<p>Detailed information about careers, functional career cadres, list of positions and functions by career/career cadres, salary tables and professional profile shall be accessed at: https://www.administracao.pr.gov.br/Recursos-Humanos</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>ANNEX III - GUIDELINES AND REQUIREMENTS SPECIFICATION FOR SOFTWARE DEVELOPMENT</strong><br />\n(PHASE 5 &ndash;5.5)</p>\n\n<p>In addition to the information described above and in order to clarify the main expectations and needs in relation to the aforementioned contracting, the following is a detailed breakdown of the specifications for Phase 5 - FORMULATION AND IMPLEMENTATION OF INFORMATION TECHNOLOGY SYSTEMATICS APPLIED TO WORKFORCE SIZING - DEVELOPMENT OF INFORMATION SYSTEM.<br />\nIt should be noted that the coordination of the product is under the responsibility of the State Secretariat for Administration and Social Security - SEAP, but with regard to technological aspects, the Companhia da Informa&ccedil;&atilde;o e Comunica&ccedil;&atilde;o do Paran&aacute; - Celepar will also be responsible for accepting the product.<br />\nThe requirements set out in this document are not restrictive in nature, having only been carried out a preliminary survey of the needs and, for the effective implementation of the DIMFT System, the Contractor shall complement the survey and its modeling, mapping, descriptions and other pertinent documents and artifacts, in order to implement, through the Information System, the methodology established for the DIMFT.<br />\nThe Contractor shall implement a solution that fully meets the needs that gave rise to this acquisition, and any changes to be proposed shall be approved by SEAP and Celepar.<br />\n&nbsp;<br />\n1.&nbsp; &nbsp; SCOPE AND LIMITS OF THE PRODUCT<br />\n1.1.&nbsp; &nbsp; GENERAL DEFINITIONS ABOUT SYSTEM PROJECT</p>\n\n<p>The scope of services of this Term of Reference for the elaboration of the Workforce Sizing System - DIMFT will involve, in general terms:<br />\n&bull;&nbsp; &nbsp; The definition of the Information System design based on the proposed methodology and its planned activities;<br />\n&bull;&nbsp; &nbsp; The Information System Project based on the established Conception, with the production of the artifacts defined in this document;<br />\n&bull;&nbsp; &nbsp; The implementation of the Information System, in line with the approach established for the project as a whole;<br />\n&bull;&nbsp; &nbsp; The transfer of the necessary knowledge for understanding and operating the system, as well as for the system&rsquo;s transition to another institution, if required; The assisted operation of the System; and<br />\n&bull;&nbsp; &nbsp; Maintenance and technical support.</p>\n\n<p>The Project Plan for the development of the DIMFT System, as part of the overall Work Plan of the project, shall consider all the activities necessary for the planning, development, implementation and delivery of the DIMFT System in operation in the production environment of the Client and shall be presented by the Contractor with, at least, the following steps:<br />\n-&nbsp; &nbsp; Systems Analysis, considering business modeling and related products that shall be validated by the SEAP business team and Celepar;<br />\n-&nbsp; &nbsp; Software design, considering its architecture, interface and database;<br />\n-&nbsp; &nbsp; System coding and testing, with the presentation of preliminary software versions for validation by SEAP and Celepar, to mitigate any risk resulting from the development process being misaligned with the project objectives;<br />\n-&nbsp; &nbsp; Approval, with installation and configuration, by the Contractor of the system&#39;s operating environment accompanied by Celepar;<br />\n-&nbsp; &nbsp; Approval, by SEAP and Celepar, of the integrated operation of the system modules and with external systems;<br />\n-&nbsp; &nbsp; Loading of data required to start system operation;<br />\n-&nbsp; &nbsp; Assisted operation of the system in production, with monitoring by the Contractor together with SEAP and Celepar;<br />\n-&nbsp; &nbsp; Training to ensure technical capability and technology transfer of the new system; and<br />\n-&nbsp; &nbsp; Maintenance and technical support.</p>\n\n<p>1.2.&nbsp; &nbsp; &nbsp;PHYSICAL VIEW OF THE SYSTEM<br />\nThe physical view of the DIMFT System architecture shall enable integration with existing systems and service infrastructure, with adequate use of the infrastructure in the environment to be indicated by SEAP.<br />\nThe physical architecture of the DIMFT System will be developed and presented in the System Project Plan, after defining the technology to be used, respecting the established software definitions.<br />\nTo implement the physical architecture, the Contractor shall carry out, together with SEAP and Celepar, an analysis of the existing infrastructure with the aim of:<br />\n-&nbsp; &nbsp; Obtain a detailed understanding of the software development architecture standards already existing at SEAP/Celepar regarding development standards, platform restrictions, and characteristics of the services to be integrated (components, webservices, database);<br />\n-&nbsp; &nbsp; Obtain a detailed understanding of SEAP/Celepar database architecture standards, considering the current database and legacy databases, in favor of the development of new DIMFT System databases.<br />\n-&nbsp; &nbsp; Use the physical infrastructure of Information and Communication Technology, which will be made available for the product, in order to develop the DIMFT System compatible with the SEAP/Celepar guidelines;<br />\n-&nbsp; &nbsp; Support mechanisms for load balancing and failure control through the use of server clusters;<br />\n-&nbsp; &nbsp; Have mechanisms to automatically detect and identify shutdowns or disconnections of integrated systems, generate logs, trigger alerts and send messages about the occurrence;<br />\n-&nbsp; &nbsp; Provide system access security and data integrity mechanisms that are compatible and integrated with the technological security infrastructure provided by SEAP;<br />\n-&nbsp; &nbsp; Provide data backup and recovery mechanisms compatible with the needs and characteristics of the system and integrated with the technological infrastructure provided by SEAP.<br />\n1.2.1&nbsp; &nbsp; &nbsp;SEAP systems to be integrated<br />\nThe integrations indicated here may undergo changes and shall be reassessed and validated by the Client when developing the contracted solution.<br />\nThe main system used by SEAP and which will provide data and information to DIMFT is the Meta4 RH-Paran&aacute; System, which is a unified and proprietary Human Resources Management and Payroll system. SEAP manages this information, serving: Own Regime (rules defined by the State): effective employees of the Executive Branch, commissioned positions and Special Regime Contracts (CRES).<br />\nThrough Meta4, it is possible to manage human resources (through features) such as hiring, dismissal, promotions, in addition to maintaining the registration of organizations, bank accounts, positions, dependents, various historical data, reference value tables, import processes, etc. From the data resulting from HR management, it is possible to calculate the payroll according to the rules defined by SEAP.<br />\nIntegration with the Meta4 System or with other systems under the responsibility of SEAP and Public Administration agenciesof the government of the State of Paran&aacute; will be done through the use of APIs, with SEAP being responsible for developing the API for accessing the source data and the Contractor being responsible for developing the APIs necessary for data consumption by the DIMFT system.<br />\nAnother system in which there may be a need for integration, depending on the characteristics of the methodology to be applied, is SIAFIC - Integrated System for Planning, Execution and Fiscal Management, which operates financial, accounting and budgetary data from the Public Administration of the Government of the State of Paran&aacute;, and operates in the Celepar Data Center and was contracted with the company Logus Sistemas de Gest&atilde;o P&uacute;blica.</p>\n\n<p>2.&nbsp; &nbsp; ACTIVITIES TO BE DEVELOPED</p>\n\n<p>Macro activities to be developed within the scope of the project will be presented below, as well as the subproducts to be delivered.</p>\n\n<p>2.1. SYSTEM PROJECT PLAN<br />\nThe System Project Plan shall describe in detail all service planning, methodology, stages and activities to be performed and respective responsibilities with their respective values, when relevant, meeting the objectives and technical specifications of this Term of Reference.<br />\nThe Contractor shall prepare the planning of the activities to be carried out in the development of this product, as a complementary part of the general Work Plan of the project, covering: (i) definition of the use of management tools; (ii) detailed schedule of the activities that will involve this product with their respective values; (iii) preparation of the responsibility matrix; (iv) definition of the structure of the documents to be prepared.</p>\n\n<p>The System Project Plan shall contain, at a minimum, the following items, in a manner consistent with what was defined in the project&#39;s general Work Plan:<br />\n&bull;&nbsp; &nbsp; Methodology for Executing Activities: technical description of the methodology to be applied in each process and production activities and the respective expected results;<br />\n&bull;&nbsp; &nbsp; List and Description of Activities: Project Breakdown Structure (WBS);<br />\n&bull;&nbsp; &nbsp; Physical and Financial Schedule for the Execution of Services: details of the physical and financial schedule with all activities to be developed and their respective costs and durations, compatible with the deadlines established by the Client, in a sequence that considers the precedence and dependency relationships between activities. The physical and financial schedule shall present the project milestones and define the dates and costs of the deliveries of intermediate and final products for each project activity;<br />\n&bull;&nbsp; &nbsp; Technical Team and Organization Chart: the Contractor shall present the allocated technical team and the organization chart defined for the project, containing the Responsibility Matrix and the functions to be performed by each technical lead identifying the management and coordination levels of each project activity;<br />\n&bull;&nbsp; &nbsp; Communication Plan: The Contractor, without prejudice to the provisions set forth in subitem 5.4.1, shall submit the Product Communication Plan containing descriptions of the types of relationships between the management, coordination and technical levels, and between those responsible for the product at the Contractor and the Client. It shall include the plan for monthly and extraordinary project monitoring meetings, and methods of recording the product (minutes, emails and other documents), constituting an integral part of the official product documentation and to be followed;<br />\n&bull;&nbsp; &nbsp; Quality and Risk Plan: The Contractor shall submit the Quality and Risk Management Plan containing a detailed description, by project activities, of the quality assurance and compliance process to be applied to the project products based on the Technical Specifications of this Terms of Reference. The Quality and Risk Management Plan shall include the Risk Matrix, including planned, corrective and predictive actions.</p>\n\n<p><br />\n2.2. DESIGN AND DEVELOPMENT&nbsp;<br />\nThe Design and Development activity of the solution shall consider the phases, activities and tasks necessary for the design, development and implementation of the Information System, in accordance with the best practices of Information Technology - IT, including considering agile methodologies for software and systems development that will be presented in the System Project Plan and in the detailed schedule.<br />\nThe Design and Development activity shall consider the entire system specified in this Terms of Reference and shall cover activities such as: Business Process Modeling within the scope of the specified system; Systems Analysis and Design within the scope of the DIMFT System; Software Analysis and Design within the scope of the DIMFT System and the respective developments and implementation. The integration, qualification and transition procedures for the implementation of the contracted system are described in the following items.<br />\nAs previously described, the operating mode and methodology for executing the project, involving the Design and Development of the system, as well as the tasks that will comprise this activity shall be detailed in the System Project Plan to be delivered by the Contractor.<br />\n2.2.1. Business Process Modeling<br />\nAt this stage, the following activities shall be carried out: (i) Planning and Strategy for modeling the Information System based on the design of the DIMFT Methodology to be adopted; (ii) Mapping and Modeling of Processes resulting from the Personnel Sizing Methodology.<br />\nThe by-products to be generated in this stage are: (i) Personnel Sizing Process Mapping Document; (ii) DIMFT System Process Consolidation Document that will be part of the scope of the software solution.<br />\n2.2.2. Systems Analysis and Design&nbsp;<br />\nIn this stage, the following activities should be carried out: (i) Description of the system&#39;s operating concepts; (ii) Specification of the system requirements, involving the identification and analysis of business processes proposed in the methodology; detailing of the logical and physical flows; (iii) Identification and description of the System&#39;s External Interfaces; (iv) System Design/Architecture involving the preparation of the system architecture project.<br />\nThe by-products to be generated in this stage are: (i) Description of Operating Concepts; (ii) Specification of System Requirements; (iii) Description of External System Interfaces; (iv) System Design/Architecture Document.<br />\n2.2.3. Software Analysis and Design<br />\nAt this stage of the product, at least the following activities shall be performed: (i) Specification of software requirements; (ii) Modeling and design of the database; (iii) WEB design of the interfaces, involving the specifications of the requirements of the software WEB interfaces; (iv) Software design, involving the preparation of the Software Design and the Specifications of the Internal Interfaces and integration with other systems; (v) Development of the DIMFT System Version. In a multiple iteration approach, it is expected that several cycles of versions of the DIMFT System and corresponding resulting processes will be generated.<br />\nThe by-products to be generated in this stage are: (i) Software Requirements Specification; (ii) System Software Design; (iii) Software Version Delivery.</p>\n\n<p>2.3. INTEGRATION AND QUALIFICATION<br />\nIntegration and Qualification activities involve the execution, by the Contractor, of the services necessary to integrate the DIMFT System with other SEAP systems and include the definition, preparation and execution of procedures and tests.<br />\nThis activity will be supported by SEAP in order to guarantee the exchange of information with user agencies or information providers to the DIMFT System, to avoid delays in the development of the project due to the failure to provide the necessary data and information.<br />\nAfter the software development is completed, software verification and validation tests will be carried out, with the aim of ensuring that the integrated software meets the previously defined system requirements and the needs of SEAP.<br />\nThe testing procedures defined in the System Test Plan shall be executed, using the Contractor&#39;s approval environment (Development Environment) and, subsequently, final acceptance tests of the software shall be carried out in the approval environment and final implementation in the production environment defined by SEAP.<br />\nThe following activities shall be carried out (for all modules that make up the System): (i) Preparation and provision of test plans for each module, involving unit, information security, usability, performance and integration tests; (ii) Preparation of test procedures; (iii) Execution of test procedures; (iv) Execution of the following tests: information security, contingency and backup and restore of the environment.</p>\n\n<p>2.3.1. Preparation of the System Test Plan<br />\nSystem testing aims to verify the correct functioning of the system in relation to its functional and non-functional requirements. Before executing the tests, a Test Plan shall be prepared to guide the execution of the tests, meeting all the functionalities of the developed software and its integrations.<br />\nThe Test Plan shall include descriptions of the tests to be performed, the traceability of the test cases with the system requirements, with the software requirements and respective use cases.<br />\nThe Test Plan shall describe and establish the test environments, that is, preparation for carrying out the tests considering hardware, software, database, initial data load and information from the Contractor&#39;s development environments, as well as SEAP approval and production environments.<br />\nThe by-product to be generated at this stage for each of the modules that make up the DIMFT System is the document: (i) System Test Plan.</p>\n\n<p>2.3.2. Testing Procedures<br />\nThis product activity refers to the preparation of the set of test procedures for each module of the DIMFT System. The inspection script and test procedures to be performed on the developed modules shall be presented.<br />\nThe by-product to be generated at this stage for each of the modules that make up the System is the document: (i) System Testing Procedure.</p>\n\n<p>2.3.3. Acceptance Tests &ndash; Approval Environment<br />\nAcceptance tests shall be carried out in the approval environment of all modules of the DIMFT System, which will aim to evaluate the results of the modules developed and the way in which the tests are conducted.<br />\nThe by-product to be generated in this stage for each of the modules that make up the System is the document: (i) Report on the Results of Acceptance Tests in the System approval Environment.</p>\n\n<p>2.3.4. Acceptance Testing &ndash; Production Environment<br />\nAcceptance tests shall be carried out in the SEAP production environment, after completion of the approval tests.<br />\nPreparation for production deployment should cover: (i) Specific requirements related to and the desired infrastructure during the deployment process, considering gradual deployment; (ii) Provision of configuration files necessary for the correct functioning of the systems; (iii) Technical documentation of the necessary environment, considering the configurations planned for gradual deployment of the system; (iv) Ways of monitoring performance of the production environment.<br />\nThe by-product to be generated in this stage for each of the modules that make up the DIMFT System is the document: Report on the Results of Acceptance Tests in the System&#39;s Production Environment, which shall be delivered with the Information System Software Version.</p>\n\n<p>2.4.&nbsp; &nbsp; &nbsp;TRANSITION<br />\nThe Product Transition activity refers to the set of services to be performed for the DIMFT System modules, relating to Assisted Operation and Technical Support, Training and Data Migration, as well as the preparation of system Documentation.<br />\nIt is emphasized that the definitions and detailed description of the activities related to the Training are provided in Phase 4 &ndash; Capacity Building.</p>\n\n<p>2.4.1.&nbsp; &nbsp; &nbsp;Assisted Operation<br />\nThe Contractor shall perform the Assisted Operation for users of the DIMFT System, which shall last 60 (sixty) business days after the approval and implementation of the Information System. This stage shall be carried out at the end of the development of each module and may occur in different periods for each module.<br />\nAssisted operation refers to the support services to be performed in the DIMFT System by the Contractor, during the period specified above, to technically support users on the use of the system and correct any failures in the functionalities of the modules implemented in order to guarantee the system and include: (i) Clarifying user doubts related to the use of the system functionalities; (ii) Detecting and recording actual or potential nonconformities in the technological solution; (iii) Performing analyses on the need for system maintenance; (iv) Detecting and guiding the correction of programs, products and functionalities of the system or of the methodology implemented by the system; (v) Performing periodic monitoring of users with the objective of detecting any inappropriate use of the system, helping to prevent future problems and identifying other needs, such as corrections and new training for users; (vi) Performing other related activities to support users.<br />\nThe objective of these services is to provide greater productivity to users regarding the use of the solution&#39;s resources, as well as to maintain effective control of the problems presented, aiming at the perfect functioning, use, security and integrity of the solution.<br />\nServices shall be performed during business hours (from 9:00 a.m. to 6:00 p.m., Monday to Friday) using teleconferencing tools, when applicable. When in person, at the SEAP headquarters, or at the agencies that are part of the work.<br />\nTo carry out this activity, SEAP will provide professionals from its staff to monitor, record occurrences and accept the services and technical solutions proposed, as well as the infrastructure necessary for the development of this activity, including telephone, furniture and Internet access.<br />\nThe by-products to be generated in this stage are: (i) Assisted Operation Plan; (ii) Report on results of the assisted operation.<br />\n2.4.2. Data Integration<br />\nSEAP has systems, databases and spreadsheets with registered information. In this sense, the Contractor shall analyze the data and information to prepare the Integration Plan of the existing data for the system platform, according to the data structure and the data model applied in the DIMFT System. All data existing in the various institutions shall be considered, and the Contractor is responsible for collecting the data for analysis in the various locations, and SEAP and other State Public Administration agencies are responsible for providing the data.<br />\nIntegrations with other Information Systems, within the scope of State Public Administration institutions and which are of a continuous nature, should be carried out, preferably, through the use of APIs, with SEAP being responsible for authorizing the use of APIs to access the systems to be integrated and the Contractor being responsible for developing the APIs that are part of the DIMFT system.<br />\nSingle or sporadic data uploads may be made by generating files, under the responsibility of SEAP, when the data are part of the institutions of the State Public Administration, and under the guidance of the Contractor. If the methodology to be applied depends on access to data available in public databases external to the Public Administration of the State of Paran&aacute;, it will be the responsibility of the Contractor to identify and capture the data in their respective sources.<br />\nIn situations that require data cleansing to make the data from their sources compatible with the information system, the Contractor will be responsible for carrying out this work, with support from SEAP to clarify the contents of the source data.<br />\nThe Contractor will be responsible for operationalizing the Integration Plan and will present a by-product to be generated at this stage: (i) Integration Plan.</p>\n\n<p><br />\n2.5.&nbsp; &nbsp; SOURCE CODE<br />\nThe Contractor&nbsp; shall provide the source codes developed to support the solution, the data model, the development component packages together with their APIs (Application Program Interface) and third-party tools required to structure the solution&#39;s development and operation environment. These artifacts shall be delivered every month, according to the execution schedule and, at the end of the contract term, in the updated version. The tools to be proposed should preferably be those in use at Celepar &#39;s Data Center. If a tool is proposed that does not fit this situation, its use shall be previously approved by the Client The Contractor shall provide the software components complementary to the developed software (e.g., Artificial Intelligence, data analysis or Business Intelligence tools). For dimensioning purposes, up to 32 nominated users who may use these tools shall be considered. Any software licenses complementary to the developed products shall be valid and updated at least until the termination of the contract.</p>\n\n<p><br />\n2.6.&nbsp; &nbsp; DOCUMENTATION<br />\nThe Contractor shall document all meetings held on the product through meeting minutes, containing the information exchanged and the decisions taken and the actions to be carried out by the parties, in accordance with the Communication Plan contained in the Work Plan. Any meetings held by teleconference shall, whenever requested, be recorded and kept in the documentation collection.<br />\nIn addition to the record of meetings and management actions of the product, the Contractor shall provide the Project Documentation, in all its phases, stages and the System Documentation, in accordance with best practices and standards, including the Data Dictionary with all due descriptions, System Operation Manual, User Operation Manual and System Installation Manual.<br />\nThe manuals shall be prepared incorporating all the system&#39;s functionalities, adopting clear and objective writing, at the same time simple and easy to understand, avoiding, whenever possible, especially in the User Operation manual, complex technical terms.<br />\nThe Contractor shall define and document the technical characteristics of the environment, covering the description of all the infrastructure necessary for the operation of the DIMFT System, comprising the server environment and the user workstations, including: (i) Technical characteristics of the environment - description of all the infrastructure necessary for the operation of the process, comprising the server environment and the user workstations; (ii) Storage, backup and recovery policies; and (iii) Description of the operational environment - hardware and software that make the operation of the system possible.<br />\nThe by-products to be generated in this stage for each of the modules that make up the DIMFT System are: (i) Data Dictionary;(ii) System Operation Manual;(iii) User Operation Manual;(iv) System Installation Manual.</p>\n\n<p><br />\n2.7.&nbsp; &nbsp; TRANSFER OF TECHNOLOGY<br />\nThe technology transfer aims to promote the transfer of knowledge acquired and developed during the project and includes the results of the services and developments carried out in the preparation of the system during the period of its execution, to the technical team indicated by the Client, which will include Celepar technicians.<br />\nThe Contractor shall, during the execution of the project, provide the Client with: (i) Supply of all technical documentation of the systems with all their components, as well as additional information produced for use by the Client in the interest of the product; (ii) Support of the implementation of the DIMFT System product, by process managers and technicians indicated by the Client; (iii) Monitoring and support in the installation and maintenance of the products with the Client&#39;s technology team; (iv) Delivery of all documentation of the artifacts generated for the DIMFT System; (v) Inclusion of practical development activities (workshop and simulation) in the scheduled courses, to internalize the theoretical knowledge obtained.</p>\n\n<p>2.8.&nbsp; &nbsp; APPROVAL OF THE INTEGRATED ENVIRONMENT<br />\nAs established as a system requirement, there is a need to integrate the DIMFT System with systems and data from various institutions within the state.<br />\nIntegration with the RH-Parana/Meta4 System is one of the main ones and, in addition to sharing data on public servants, positions and salaries, involves the integration of the workflow of processes.<br />\nAfter implementing all modules of the DIMFT System, the Contractor&nbsp; shall have all planned integration functionalities approved, proving the integration between the developed modules and those existing systems for which integration is planned.<br />\nTo do this, the Conctractor team, shall be coordinated and work together with the team defined by the Client and and by Celepar to identify and correct possible failures in order to ensure that all integrations work as planned in the DIMFT System production environment.<br />\nA technician from the Client will monitor the approval process for the integrated environment.</p>\n\n<p><br />\n2.9.&nbsp; &nbsp; MAINTENANCE AND TECHNICAL SUPPORT<br />\nThe Contractor shall prepare a Maintenance and Technical Support Plan with the procedures to be adopted for the continuity of the DIMFT in the production environment. This Maintenance and Technical Support Plan shall be executed in the event of failures or defects in the DIMFT software, upon request by the Client.<br />\nDuring the maintenance period, the Contractor&nbsp; shall respond to calls received from the Client to resolve potential problems related to maintaining the correct functioning of the DIMFT System. The specific Maintenance and Technical Support service shall focus on corrective maintenance. On the other hand, if evolutionary maintenance that is relevant to DIMFT is identified, this will be handled through requirements and change management.<br />\nThe requested technical support service may be provided locally or remotely. Remote service may be provided by email or through the 0800-call center provided by the Contractor. Cases that require local service and that require time for the technician to be mobilized to the Contractor&#39;s facilities shall be handled and agreed upon between the Client and the Contractor.<br />\nThis communication channel shall allow, at a minimum, the recording of the following information:<br />\na)&nbsp; &nbsp; Opening hours;<br />\nb)&nbsp; &nbsp; Degree of severity and description of the occurrence;<br />\nc)&nbsp; &nbsp; Time of first return by the Contractor;<br />\nd)&nbsp; &nbsp; Start time of the contractor&#39;s work for the technical solution;<br />\ne)&nbsp; &nbsp; Communication, by the Contractor, of the completion of work to resolve the situation;<br />\nf)&nbsp; &nbsp; Client&rsquo;s assessment of the completion of the technical solution;<br />\ng)&nbsp; &nbsp; For the purposes of controlling service deadlines, the technical call will be considered resolved/completed at the time the Contractor communicates the completion of the work, provided that the Client&#39;s assessment is positive, even if it occurs later.<br />\nThe degree of severity will determine the priority of service according to the impact resulting from the incident as recorded in the following table which represents the established Service Level Agreement (SLA).<br />\nThe verification of indicators and the assessment of compliance with established goals will be carried out through the receipt of monthly reports, generated through a computerized system connected to the service platform made available by the Contractor.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Incident Handling Table</strong></p>\n\n<table border=\"1\" style=\"height:222px; width:898px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#eeeeee; height:13.8pt; width:59.35pt\">\n\t\t\t<p><strong>Severity</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#eeeeee; height:13.8pt; width:174.55pt\">\n\t\t\t<p><strong>Impact</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#eeeeee; height:13.8pt; width:70.85pt\">\n\t\t\t<p><strong>TR - Response Time</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#eeeeee; height:13.8pt; width:63.8pt\">\n\t\t\t<p><strong>TS - Solution Time</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#eeeeee; height:13.8pt; width:62.35pt\">\n\t\t\t<p><strong>Treatment Regimen</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:59.35pt\">\n\t\t\t<p><strong>High</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:174.55pt\">\n\t\t\t<p>Total Unavailability: operational incident that causes the total interruption of the service for users</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:70.85pt\">\n\t\t\t<p>4 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.8pt\">\n\t\t\t<p>8 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:62.35pt\">\n\t\t\t<p>Commercial</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:59.35pt\">\n\t\t\t<p><strong>Average</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:174.55pt\">\n\t\t\t<p>Partial Unavailability: operational incident that causes the interruption of one or more functionalities for service users</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:70.85pt\">\n\t\t\t<p>6 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.8pt\">\n\t\t\t<p>12 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:62.35pt\">\n\t\t\t<p>Commercial</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:59.35pt\">\n\t\t\t<p><strong>Low</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:174.55pt\">\n\t\t\t<p>Slowness, reduced performance or operational incident that impacts a functionality of the solution</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:70.85pt\">\n\t\t\t<p>8 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.8pt\">\n\t\t\t<p>40 hours</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:62.35pt\">\n\t\t\t<p>Commercial</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Upon justification and provided that it is accepted by SEAP, the established deadlines may be extended or temporary workaround solutions may be adopted.<br />\nThe Contractor&#39;s actions in the event of incidents and requests recorded by the Client will comply with service levels in accordance with the impact resulting from the severity of the incidents and in accordance with the established service provision schedules.<br />\nThe service deadline for incidents and requests will start from the registration of the request, within the Treatment Regime hours, or from the first hour of the next service cycle to be initiated.<br />\nFor the purpose of initiating technical action activities on the incident, the record in the incident management tool will be considered, which will also be used to note the resumption of normal services or additional actions that may be necessary to resolve any problem that caused the incident.<br />\nIf the incident originates from software and hardware components that depend on third-party interventions, this information shall be recorded, as well as the steps being taken and the prospect of normalization.<br />\nWhile the incident call or request is under the responsibility of the Client, the counting of the time of action will be paused, resuming when it is under the responsibility of the Contractor.<br />\nThe incident will be considered closed, for ANS accounting purposes, when service availability is reestablished under the terms defined for Severity Levels and ANS, regardless of the recording of the action and closing of the respective call.<br />\nWhen opening multiple incidents related to the same source, they will be referenced by the first one.</p>\n\n<p><br />\n2.10.&nbsp; &nbsp; SYSTEM OPERATION INFRASTRUCTURE SPECIFICATION<br />\nThe DIMFT System shall be a system entirely built to be accessed via a WEB platform, and may be accessed from the Internet, via the State&#39;s corporate network or externally. The provision of a suitable network link for access to the system and for the system to be used via an Internet browser shall be the responsibility of the Client.<br />\nThe Client will be responsible for the fundamental items for the system to function in a WEB environment, namely: Internet link on the corporate network; Secure environment; Corporate network infrastructure; Hosting of processing units (physical and logical), managed by operating systems, as well as the installation of a set of other applications, routines or systems (software) that will perform specific activities, installed and configured in a personalized manner and other infrastructure items necessary for the operation of the development, approval and production environments, according to standards defined for the system hosting environment in the Celepar Data Center.<br />\nAll hardware, software and network infrastructure described above as fundamental items for the implementation of the DIMFT System will be the responsibility of the Client, and the Contractor may only support its dimensioning. The Contractor undertakes to provide additional software licenses to the environment defined in the Celepar Data Center and which are necessary for structuring the development and operation environment&nbsp; the DIMFT system.<br />\nAs previously mentioned, the systems will be installed in Celepar&#39;s Data Center, in the environment that serves SEAP. The available infrastructure consists of high-performance servers with large storage capacity, which are hosted in Celepar&#39;s Data Center that serves the Government of the State of Paran&aacute;.<br />\nCelepar&#39;s current production environment is described in Item 5 of ANNEX III of this document.</p>\n\n<p>2.11.&nbsp; &nbsp; PREPARATION OF DEVELOPMENT, APPROVAL AND PRODUCTION ENVIRONMENTS<br />\nThe Contractor will be responsible for the installation, documentation and configuration of the DIMFT System in the development environments and in the approval and production environments to be made available by the Client, in order to allow its perfect functioning and compliance with the specified technical requirements.<br />\nThe DIMFT System will be developed in the Contractor&#39;s development environment, which shall provide, at its own expense, all hardware and software infrastructure, as well as the physical resources necessary to provide the contracted services.<br />\nThe Contractor&nbsp; shall install and configure the approval and production environments indicated by the Client.<br />\nThe infrastructure of the approval environment shall be adequate to meet the needs of the approval process, and may adopt hardware with a lower capacity than that provided for the production environment, but including the same configurations as the production environment.<br />\nRequirements for deployment into production shall include a final code audit to verify the use of good programming practices and system security verification tests, including intrusion tests.<br />\nThe services described above shall be performed by the Contractor&#39;s technicians, accompanied by technicians appointed by the Client, and at the end of this process, the systems shall be implemented and in operation, configured, stable and operational, duly approved by Celepar.<br />\nThe Contractor shall observe the security standards, norms and rules in use in the Client&acute;s technological environments.<br />\nAny need for adjustments or changes arising from specific characteristics and requirements shall be discussed in advance with the Client&#39;s technicians.<br />\nThe Contractor shall submit the complete technological solution to be approved by the Client with support from Celepar.</p>\n\n<p>3.&nbsp; &nbsp; PRODUCTS, EXPECTED RESULTS, FORM OF PRESENTATION AND ACCEPTANCE OF SERVICES<br />\n3.1.&nbsp; &nbsp; PRODUCTS AND BY-PRODUCTS TO BE SUPPLIED<br />\nThe products and by-products to be provided under this Term of Reference are the software engineering artifacts required for system operation and future transition, resulting from the project&#39;s macro activities, as well as monitoring reports on project management activities, assisted operation and technical support.<br />\nThe products related to the activities that make up each macroactivity, intermediate products to the deliveries defined in the table below, shall be detailed in the System Project Plan, as well as the distribution of these deliveries in the months of the project, in accordance with the Physical and Financial Schedule of Activities presented in the System Project Plan.<br />\nThe following table shows the deliveries expected throughout the project, defining the products/by-products. For the disbursement to be made, all subproducts related to the delivery shall be approved by the Client through the acceptance term.</p>\n\n<p>Products, subproducts/activities distributed throughout the information system project</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:386px; width:1174px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#a6a6a6; height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\"><strong>PRODUCT NAME BY-PRODUCT/ACTIVITIES</strong></td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Project&nbsp; Plan</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Personnel Sizing Process Mapping Document;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">DIMFT System Process Consolidation Document that will be part of the scope of the software solution</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Description of System Operation Concepts</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Requirements Specification</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Description of the System&#39;s External Interfaces</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Design/Architecture Document</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Software Requirements Specification</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Software Design</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Software Version Delivery</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Test Plan</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Testing Procedure</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Report on the Results of Acceptance Tests in the System Approval Environment&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:25.5pt; text-align:justify; vertical-align:middle; white-space:normal; width:498pt\">Report on the Results of Acceptance Tests in the System Production Environment that shall be delivered with the Information System Software Version</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Assisted Operation Plan</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Assisted Operation Results Report</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Integration Plan</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Source code, data model, APIs and third-party tools</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Data dictionary</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Operation Manual</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">User Operation Manual</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">System Installation Manual</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:25.5pt; vertical-align:middle; white-space:normal; width:498pt\">Provision of all technical documentation of the systems with all their components, as well as additional information produced for use by the Client in the interest of the product</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:25.5pt; vertical-align:middle; white-space:normal; width:498pt\">Monitoring of the implementation of the DIMFT System product, by process managers and technicians indicated by the Client.</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Monitoring and support in the installation and maintenance of products together with the Client&#39;s technology team</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Delivery of all documentation of the artifacts generated for the DIMFT System</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:25.5pt; vertical-align:middle; white-space:normal; width:498pt\">Inclusion of practical development activities (workshop and simulation) in the scheduled courses, to internalize the theoretical knowledge obtained</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Integration functions tested and working</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Technical support services, in accordance with the established service level</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:25.5pt; vertical-align:middle; white-space:normal; width:498pt\">System Operation Infrastructure Specified in accordance with the standards adopted in the Data Center defined by the Client</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:middle; white-space:normal; width:498pt\">Ready-to-use Development, Homologation and Production Environments</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>The schedule presented, as well as the description of the by-products/activities, is a forecast for analysis by the Contractor, who may present changes in its proposal for evaluation by SEAP and Celepar.</p>\n\n<p><br />\n3.2.&nbsp; &nbsp; FORM OF PRESENTATION AND ACCEPTANCE OF PRODUCTS<br />\nAll products resulting from activities that are part of the scope of Phase 5 of this Term of Reference shall be presented in digital format and, in specific cases, in accordance with the following compliance:<br />\n&bull;&nbsp; &nbsp; 01 (one) digital copy of the DIMFT System software, in version 1.0 approved by the Client. For each new version produced, the Contractor shall deliver a new copy after approval, until the final version of the implemented software is delivered;<br />\n&bull;&nbsp; &nbsp; Operation Manual in digital media;<br />\n&bull;&nbsp; &nbsp; System Manual and System Installation Manual in digital format;<br />\n&bull;&nbsp; &nbsp; Project reports, in digital format, generated monthly, with the appropriate document identification and numbering, according to the standard proposed by the Contractor;<br />\n&bull;&nbsp; &nbsp; Final product report, in digital format, including all product documents, in an orderly, referenced and organized manner, according to the standard proposed by the Contractor.</p>\n\n<p>The Contractor shall present, in the System Project Plan, the standard and model for structuring, referencing and organizing the product documents, which shall be analyzed and approved by the Client. This will be the standard to be followed when delivering related products (Product Documents and Product Reports).<br />\nAll generated artifacts, reports and documents cited shall be delivered in digital format, with the digital format being 1 (one) copy in .pdf and 1 (one) copy in editable format (word, for example).<br />\nSEAP will issue a Provisional Receipt Term for each stage delivered by the Contractor.<br />\nSEAP together with Celepar will have a maximum period of 15 (fifteen) business days, respecting the minimum period of 5 (five) business days, to assess whether the products delivered are in accordance with the specifications of this Term of Reference, with the aim of APPROVING (ACCEPT) or REJECTING the products delivered. This period shall be considered in the Project Plan. Failure by SEAP to respond within these periods will imply tacit acceptance of the delivered artifacts.<br />\nIf the products of a delivery are REJECTED, the Contractor shall, after notification from SEAP, make the necessary and requested adjustments, based on the technical specifications of the products, contained in this Term of Reference, within 10 days, counted from the date of receipt of the formalization of the rejection issued by the Client.<br />\nThe Final Receipt and Approval of Products Term, through the product acceptance term, relating to each delivery will be issued after compliance assessment and confirmation that the artifacts comply with the technical specifications established in this Term of Reference and in the System Project Plan.<br />\nThe Rejection Term will be issued when there are technical errors or improprieties or failure to meet technical specifications that are characterized as impediments to receiving the artifacts, quality defects or failure to observe the standards and best practices for project development.<br />\nAPPROVAL or ACCEPTANCE of products by SEAP and Celepar, where applicable, does not exempt the CONTRACTOR from responsibility for correcting errors identified within the warranty period defined for the project.</p>\n\n<p><br />\n3.3.&nbsp; &nbsp; PLACE OF SERVICE PERFORMANCE<br />\nThe services shall be performed at the Contractor&#39;s facilities, which shall provide, at its own expense, all hardware and software infrastructure as well as the physical resources necessary to perform the contracted services.<br />\nInteractions with SEAP professionals, necessary for the execution of services, will take place in Curitiba - PR, and the Contractor will be responsible for the displacement of professionals involved in the provision of services when necessary. Meetings may be held remotely, via teleconference, when possible and authorized by the Client.<br />\nThe Contractor shall necessarily connect to the Celepar network, duly authorized by SEAP, to use the Celepar technological infrastructure environment, mainly for configuration and technical support activities related to the approval and operation services of the Information System in the Celepar Data Center environment. To this end, all security and access standards for systems and environments defined by Celepar shall be followed.<br />\nThe technological infrastructure required to provide the contracted service, including: hardware, software and physical and logical connections of the CONTRACTOR&#39;s development environment, shall be in operation within a maximum period of 60 (sixty) days from the signing of the contract, at which time it may be subject to inspection by Celepar/SEAP.</p>\n\n<p>4.&nbsp; &nbsp; TECHNOLOGICAL PARTNER<br />\nCelepar is the company responsible for maintaining the Information and Communication Technology (ICT) infrastructure in the State of Paran&aacute; and providing related services. It is responsible for defining the software platforms adopted by the State of Paran&aacute;, as well as maintaining the physical network, providing corporate systems and network security.<br />\nSEAP does not have a physical structure or ICT technical team to maintain systems and data centers, and hosts its systems on servers at Celepar, through contracts with the company.<br />\nThe DIMFT System will be installed in a production environment at Celepar&#39;s data center and shall follow platform definitions and restrictions, in addition to security protocols.<br />\nAfter the end of the development and technical support contract, SEAP will define the institution that will be responsible for the development of the systems. To this end, one or more technicians will be designated to monitor all phases of the project, including training and technology transfer.<br />\nFurthermore, a large part of the State&#39;s legacy systems and corporate systems, which shall be considered in the integration with the new systems, are also under the responsibility of Celepar or in operation in the company&#39;s Data Center.<br />\nTherefore, all information contained in this Term of Reference related to the Client with regard to technological aspects will include its partner Celepar &ndash; Companhia de Tecnologia da Informa&ccedil;&atilde;o e Comunica&ccedil;&atilde;o do Paran&aacute;, located at Rua Mateus Leme, 1561 &ndash; Centro C&iacute;vico &ndash; CEP 80.530-010 &ndash; Curitiba/PR.</p>\n\n<p>5.&nbsp; &nbsp; CELEPAR PRODUCTION ENVIRONMENT&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:2004px; width:911px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Database</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>PostgreSQL</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>10.1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Oracle</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>11G R2 and 12C (check license availability)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Platforms for Development</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Java Web</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>1.7 or higher</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Light PHP</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>5.5.11 or higher</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Application Servers</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>JBoss</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>WildFly 10.x (for new applications)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Apache</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>No version restriction - latest available on the operating system</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Version Control Systems</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>CVS or SVN</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Application Publishing Systems</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Shipyard</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Jenkins</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Systems for Library Managers</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Composer</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Maven</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:425.95pt\">\n\t\t\t<p><strong>Security Systems</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>IDDigital</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Security Center</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Server Operating Systems</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Linux</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>SLES 12 sp1 or sp3 (constantly evolving)</p>\n\n\t\t\t<p>CentOS and Debian distributions</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>Windows</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>2012 R2 (we have already developed the 2016 template, and this should be adopted in the next servers)</p>\n\n\t\t\t<p>Legacy - numerous versions (2000, 2003, 2008, 2008R2, etc...)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:426.0pt\">\n\t\t\t<p><strong>Systems for Virtualization</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>VMware</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.8pt\">\n\t\t\t<p>vSphere 6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:black; vertical-align:top; width:425.95pt\">\n\t\t\t<p><strong>Authoritative Bases</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p><strong>Software</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p><strong>Version</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>OpenLDAP (Expresso)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>AD &ndash; Active Directory</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; vertical-align:top; width:149.2pt\">\n\t\t\t<p>IDDigital</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:276.75pt\">\n\t\t\t<p>Use the version available in the Celepar corporate environment</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>ANNEX IV</strong><br />\nList of Requirements for the DIMFT Information System&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"height:4939px; width:941px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#e7e6e6; width:35.2pt\">ITEM</td>\n\t\t\t<td style=\"background-color:#e7e6e6; width:425.0pt\">\n\t\t\t<p>DESCRIPTION</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ffc000; width:35.2pt\">1.</td>\n\t\t\t<td style=\"background-color:#ffc000; width:425.0pt\">\n\t\t\t<p>NON-FUNCTIONAL REQUIREMENTS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">\n\t\t\t<p>1.1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The authentication of system users shall be done in an integrated manner with the Security Center used in the corporate environment of the State of Paran&aacute;.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.2.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system&#39;s parameterization in its various modalities, such as report formatting, use of parameters for indicators (for example, open or closed regime, function), restrictions, establishment of calculation formulas or other situations that require adaptations for use of the proposed methodology shall be designed for creation and updating by system users, without the need for changes to the program code.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.3.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall allow the creation of access profiles to its functionalities, with administration directly by its users.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.4.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Considering the diversity of users of the system, with different functions, its usability shall include accessibility aspects and the interface shall be compatible with the operations to be performed, according to the user profiles, being totally intuitive for operational activities and with information and guidance provided directly by the system for more complex functions that require user expertise, such as system parameterization, sizing calculations and information analysis.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.5.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Access to the DIMFT System functionalities will be provided, at least, through the following WEB browsers: Microsoft Edge, Firefox, Safari and Chrome, in their most recent versions, in an infrastructure and operating software that will be provided by SEAP, as stated in item 2.10 (System Operating Infrastructure Specification).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.6.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Integrations with other Information Systems, within the scope of State Public Administration institutions and which are of a continuous nature, should be carried out, preferably, through the use of APIs, with SEAP being responsible for authorizing the use of APIs to access the systems to be integrated and the Contractor being responsible for developing the APIs that are part of the DIMFT system.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.7.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The DIMFT System shall include the creation of APIs that allow the exposure of data generated by the system to be accessed by other systems of interest to the State Public Administration. In specific situations, the system data may also be exported in file exchange formats.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.8.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The DIMFT System shall be developed within the scope of this Term of Reference using a development platform in accordance with environments approved for the Celepar Data Center, as stated in item 2.10 (System Operation Infrastructure Specification).</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.9.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The Database Management System to be used in the system shall be PostgreSQL, unless another proposal is approved by the Client, provided that the state&#39;s interest is proven.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">1.10.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System should consider the adoption of specialized tools that can be integrated with the core to be developed, in order to enable data analysis, scenario generation, report and dashboard generation, application of Artificial Intelligence and other facilities compatible with the functional requirements employed. The tools to be proposed should preferably be those in use at Celepar&#39;s Data Center. If a tool is proposed that does not fit this situation, its use shall be previously approved by the Client. In the case of proposing these specialized tools, the established licensing rules shall be complied with.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ffc000; width:35.2pt\">2.</td>\n\t\t\t<td style=\"background-color:#ffc000; width:425.0pt\">\n\t\t\t<p>GENERAL REQUIREMENTS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">2.1.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The products to be developed within the scope of the project shall cover all the Agencies/Entities covered (Annex I), careers/career cadres with respective positions/functions, which have not been declared extinct upon becoming vacant (Annex II). It should be noted that possible changes in the organizational structure and/or careers/career cadres due to new state management guidelines implemented after the publication of this Term shall be considered and incorporated. Consider the updated version of Annexes I and II at the time of the contract. (Item 4)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">2.2.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall be capable of including a methodological proposal, including data collection and parameter definition, which includes the establishment of stratified and statistically representative samples in each area, agency or career cadre, provided that there is a high degree of standardization of processes. (Item 4.2.4)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">2.3.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall be capable of maintaining versions produced in the functional dimensions performed, including the data used for dimensioning, enabling comparison of the results obtained in each of the versions.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ffc000; height:58.1pt; width:35.2pt\">3.</td>\n\t\t\t<td style=\"background-color:#ffc000; height:58.1pt; width:425.0pt\">\n\t\t\t<p><strong>CURRENT SITUATION SURVEY (5.2.1)</strong></p>\n\n\t\t\t<p>The System shall provide functionalities for data capture through integration with other systems, manual input, and asynchronous data loading to store the information resulting from the current situation survey, in accordance with Annexes I and II. It shall &nbsp;also be capable of including other institutions and career paths, and shall address the following aspects &mdash; or others, should there be changes in the proposed reference model:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.1.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Survey and analysis of the current workforce in agencies/entities: quantity by type of employment relationship, carreer cadre, position/function and unit, with emphasis on the activities performed. (Item 5.2.1.1.1.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.2.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Survey, identification and analysis of the organizational structure of all Agencies/Entities that make up the Direct Administration and Autonomous Agencies, according to the level of activity of the organizational structure, covering regional structures. (Item 5.2.1.1.2.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.3.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Survey of legally established competencies, competencies intrinsic to the execution of the public service, and organizational goals of the Agencies/Entities subject to the dimensioning to be carried out according to the levels of action of their organizational structure, covering regional structures. (Item 5.2.1.1.3.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.4.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Survey and analysis of available productivity data, individually and comparatively, in the case of units that have a similar service profile, providing, when possible, indicators for the subsequent preparation of action plans to improve productivity (for example, employee training plan, process standardization, automation of activities, need to improve technological conditions etc.). (Item 5.2.1.1.4.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.5.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Collection of information regarding turnover, absenteeism, absences, seasonal demand, pent-up demand, overestimated demand, deviations from function and their impacts on performance and productivity, as well as on the state public budget. (Item 5.2.1.1.5)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.6.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Mapping of existing jobs in agencies/entities, by type: in-person, hybrid and teleworking, with a breakdown of the levels of operational units in their organizational structure. (Item 5.2.1.1.6)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.7.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Identification of the strategic role played by the areas of the State and vision of the future, taking into account social and economic changes, in work and social security regimes, technological and work processes innovations, and respective impacts on the demand for the workforce, qualitatively and quantitatively. (Item 5.2.1.1.7)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.8.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Identification and analysis of priority demands, repressed demands, difficulties, distortions, critical issues, good management practices that resulted in increased productivity, among others. (Item 5.2.1.1.8)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.9.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Information considered relevant to the execution of the survey and dimensioning, obtained from the respective agencies and managers, using specific forms and structured questionnaires. (Item 5.2.1.1.9)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.10.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Macro data relating to costs corresponding to the carreer cadre, considering all financial advantages (bonuses, benefits, assistance, dangerousness, unhealthy conditions, among others) related to the position/function evaluated. (Item 5.2.1.1.10)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.11.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Professional profiles of each position/function, such as education, duties, work regime, working hours, among others. (Item 5.2.1.1.11)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.12.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Percentage of absenteeism by function, broken down by the career cadre, agency/entity, considering and discriminating the different causes of absence (foreseen and unforeseen). (Item 5.2.1.1.12)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">3.13.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>Seasonal demand, pent-up demand, overestimated demand, function deviations and their impacts on performance and productivity, as well as on the state public budget. (Item 5.2.1.1.13)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ffc000; width:35.2pt\">4.</td>\n\t\t\t<td style=\"background-color:#ffc000; width:425.0pt\">\n\t\t\t<p>WORKFORCE SIZING (5.2.2)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.1.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall be able to identify, in terms of qualitative and quantitative profiles, the ideal carreer cadre for the functioning of the administrative units that make up the areas of State activity in the current context and over a horizon of up to 10 years.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.2.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall be able to implement differentiated strategies for the various sectors according to the reality identified. For example, in areas and units that present the same service profile as hospitals, the dimensioning work can be replicated by adopting sizes. In units of the same profile and size or of equivalent size, the same dimensioning can be applied, but it shall always be aligned with the trend indicated by the demographic behavior of the state/municipalities.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.3.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall provide functionalities to dimension the workforce, according to the proposed methodology, through the implementation of parameterizable algorithms and indicators, user interaction interfaces, data analysis mechanisms, production of queries, reports and panels representing the results and generation of data to eventually be consumed by other systems (for example, in csv format), covering, at least, the following aspects, or others if there is a change in the proposed reference model.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.4.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall consolidate the methodological proposal for sizing the workforce, by area of activity, based on a survey of qualitative, quantitative and cost data, analysis of indicators and application of the parameters adopted. (Item 5.2.2.1.1)..</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.5.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall present a detailed and structured documentation/dossier by area of activity, carreer cadre, position and function, of the methodology developed for preparing the Workforce Sizing, indicating the parameters used, indicators and other information pertinent to the data modeling used. (Item 5.2.2.1.2.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.6.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall identify of which Agencies/Entities, based on a comparison of the proposed ideal sizing and the existing staff, are oversized, undersized, or have the correct sizing, but with an imbalance between the levels of activity of their organizational structure, covering the regions. (Item 5.2.2.1.3.)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.7.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall provide information that allows the preparation of strategy proposals aimed at optimizing human, material, financial and budgetary resources that include, among others: (Item 5.2.2.1.4.)</p>\n\n\t\t\t<p>a) adjustments to the composition of the workforce, in terms of profile, hiring method, modernization and restructuring of career cadres, including recommendations for the elimination, creation or reformulation of positions and/or functions;</p>\n\n\t\t\t<p>b) modernization of management through review of processes, investment in information technology, including the use of information systems and application of artificial intelligence, change in the way services are offered (digital and others);</p>\n\n\t\t\t<p>c) adoption of the Teleworking regime;</p>\n\n\t\t\t<p>d) indication of distortions, deficiencies and problems found and recommendation of the necessary interventions to solve them;</p>\n\n\t\t\t<p>e) guidelines for developing a career cadres training plan;</p>\n\n\t\t\t<p>f) Possibility of alternative service provision models that consider, among other possibilities, partnerships with the third sector, public-private partnerships and outsourcing.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">4.8.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The system shall provide functionalities that support workforce sizing activities, as described in subitem 5.2.2.2 of the Term of Reference.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#ffc000; width:35.2pt\">5.</td>\n\t\t\t<td style=\"background-color:#ffc000; width:425.0pt\">\n\t\t\t<p>WORKFORCE ADEQUACY PLAN AND WORKFORCE PLANNING INSTITUTIONALIZATION PLAN (5.3)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">5.1.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall provide functionalities for carrying out comparative analyses between the current situation and the sizing, allowing the identification of deficit and surplus areas, indicating the necessary interventions, which may include, in addition to the replacement or expansion of the number of employees, the restructuring of work processes, requalification, reassignments or reformulation of the service contracting method, according to the proposed methodology.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.2pt\">5.2.</td>\n\t\t\t<td style=\"vertical-align:top; width:425.0pt\">\n\t\t\t<p>The System shall provide functionalities to support the preparation of the workforce adequacy plan (replacement, expansion and optimization), as detailed in 5.3.1, establishing the need for hiring employees and the respective cost forecast, for the short term (zero to 2 years), medium term (3 to 5 years) and longterm (6 to 10 years), considering the hiring forecast resulting from the replacement rates and projection of revenues and expenses of the State, by agency/entity, in accordance with the Carreer cadres, Positions and Functions, taking into account the potential for using a reserve register in current public examinations and the limits established in Complementary Law No. 101, Fiscal Responsibility Law.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00364727","notice_type":"Request for Expression of Interest","noticedate":"16-Jul-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-08-05T00:00:00Z","submission_deadline_time":"05:00","project_ctry_name":"Western and Central Africa","project_id":"P176932","project_name":"Digital Transformation for Africa/ Western Africa Regional Digital Integration Program SOP1","bid_reference_no":"ET-AUC-493209-CS-QCBS","bid_description":"Consultancy Services for the Development of a Child-Friendly Public Portal for Online Safety and Digital Engagement for African Children within AU Member States – WARDIP PROJECT","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Africa Union HeadquartersP.O.BOX 3243Tel: 251-11-5-517700webmaster: webmaster@africa-union.orgAddis","contact_ctry_name":"Ethiopia","contact_email":"BayinganaM@africa-union.org","contact_name":"Moses Bayingana","contact_organization":"Africa Union Commission","contact_phone_no":"+251927935939","submission_date":"2025-07-16T00:00:00Z","notice_text":"<p>&nbsp;</p>\n\n<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES &ndash; FIRM SELECTION)-Readvertised </strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Country: </strong>Ethiopia<strong> </strong></p>\n\n<p><strong>Name of Project: </strong>DIGITAL TRANSFORMATION FOR AFRICA/ WESTERN AFRICA REGIONAL DIGITAL INTEGRATION PROGRAM (DTFA/ WARDIP) SOP-1</p>\n\n<p><strong>Grant No: P180117</strong></p>\n\n<p><strong>Assignment Title:</strong> Consultancy Services for the Development of a Child-Friendly Public Portal for Online Safety and Digital Engagement for African Children within AU Member States &ndash; WARDIP PROJECT</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>. &nbsp;ET-AUC-493209-CS-QCBS</p>\n\n<p>The African Union Commission has received financing from the World Bank toward the cost of DIGITAL TRANSFORMATION FOR AFRICA/ WESTERN AFRICA REGIONAL DIGITAL INTEGRATION PROGRAM (DTFA/ WARDIP) SOP-1<em> </em>and intends to apply part of the proceeds for consulting services.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>The consulting services (&ldquo;the Services&rdquo;) include Selection of Consulting firm for the Development of a Child-Friendly Public Portal for Online Safety and Digital Engagement for African Children within AU Member States &ndash; WARDIP PROJECT</p>\n\n<p>&nbsp;</p>\n\n<p>The detailed Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.</p>\n\n<p>&nbsp;</p>\n\n<p>The African Union Commission now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p>\n\n<p>&nbsp;</p>\n\n<p>The shortlisting criteria are:&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Proven Track Record</strong>: Demonstrated in prior assignments on the development of a child-friendly online public portal for online safety and digital engagement. The firm should have relevant 10 years of experience in child online public portal development at national / regional levels.</p>\n\n<p><strong>Demonstrated </strong>success in managing and delivering at least 3 similar projects or services with similar scope and activities, preferability at national, regional and/or continental levels.</p>\n\n<p><strong>Technical and Professional Capabilities: </strong></p>\n\n<p><strong>Qualified Personnel</strong>: A team of skilled professionals with relevant expertise, including advanced degrees, certifications, and practical experience in the area concerned.</p>\n\n<p><strong>Technical Resources</strong>: Access to the latest technology, tools, and methodologies required to execute projects effectively.</p>\n\n<p><strong>Financial Stability: </strong></p>\n\n<p><strong>Financial Health</strong>: Strong financial standing with evidence of profitability, financial management practices, and the ability to sustain operations and project delivery over time. <strong>Insurance and Liability Coverage</strong>: Adequate insurance coverage, including professional liability insurance, to protect against potential risks.</p>\n\n<p><strong>Quality Assurance: </strong></p>\n\n<p><strong>Certifications</strong>: Relevant industry certifications such as ISO 9001 for quality management systems or other standards that demonstrate commitment to quality.</p>\n\n<p><strong>Processes and Methodologies</strong>: Established processes and methodologies for project management, quality control, and continuous improvement.</p>\n\n<p><strong>Compliance and Risk Management: </strong></p>\n\n<p><strong>Regulatory Compliance</strong>: Adherence to relevant laws, regulations, and standards within the industry.</p>\n\n<p><strong>Risk Management Practices</strong>: Well-defined risk management procedures to identify, assess, and mitigate potential risks associated with projects.</p>\n\n<p><strong>Client References and testimonials</strong>:</p>\n\n<p><strong>References</strong>: Positive references and testimonials from previous or current clients, demonstrating the firm&rsquo;s reputation and reliability.</p>\n\n<p><strong>Case Studies</strong>: Detailed case studies showcasing successful project delivery and&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>outcomes.</p>\n\n<p>&nbsp;<strong>Organizational Structure: </strong></p>\n\n<p><strong>Effective Management</strong>: An effective organizational structure with clear roles and responsibilities, ensuring efficient project management and execution.</p>\n\n<p><strong>Support Systems</strong>: Robust support systems for administrative, logistical, and operational functions.</p>\n\n<p><strong>Project Management Expertise: </strong></p>\n\n<p><strong>Project Management Certifications</strong>: Certifications such as PMP (Project Management Professional) or similar credentials that validate expertise in project management.</p>\n\n<p><strong>Track Record of Delivery</strong>: Proven ability to deliver projects on time, within budget, and to the required quality standards.</p>\n\n<p><strong>Communication and Collaboration: </strong></p>\n\n<p><strong>Stakeholder Engagement</strong>: Skills in engaging and managing relationships with various stakeholders, including clients, vendors, and team members.</p>\n\n<p><strong>Reporting and Documentation</strong>: Ability to provide clear and comprehensive reports and documentation throughout the project lifecycle</p>\n\n<p>&nbsp;</p>\n\n<p>Key Experts will not be evaluated at the shortlisting stage.</p>\n\n<p>&nbsp;</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2020 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>&nbsp;</p>\n\n<p>A Consultant will be selected in accordance with the Consultants Quality and Cost-based Selection method set out in the Procurement Regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours <em>0900 to 1700 hours</em>.</p>\n\n<p>&nbsp;</p>\n\n<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by <strong>05 August 2025 </strong>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>African Union Commission, </strong></p>\n\n<p><strong>Attn: Head of Supply Chain Management Division </strong></p>\n\n<p><strong>Building C, 3rd Floor, </strong></p>\n\n<p><strong>P.O Box 3243,<em> </em>Roosevelt Street </strong></p>\n\n<p><strong>Addis Ababa, Ethiopia </strong></p>\n\n<p><strong>Tel: +251 (0) 11 551 7700 &ndash; Ext 4305 </strong></p>\n\n<p><strong>Fax: +251 (0) 11 551 0442; +251 11-551-0430 </strong></p>\n\n<p><strong>E-mail: </strong><strong><u>tender@africa-union.org</u></strong><strong> </strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>TERMS OF REFERENCE </strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; FIRM)</strong></p>\n\n<p><strong>Proc REF: ET-AUC-493209-CS-QCBS</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>INTRODUCTION</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>Access to the digital space in Africa is increasingly expanding, and many of those coming online are children &ndash;defined as &lsquo;all those under the age of 18&rsquo;. It is estimated that worldwide 1 in 3 internet users is a child, and more than 175,000 children go online for the first time every day - a new child every half a second.</p>\n\n<p>In Africa, it is estimated that 40% of youth aged between 15-24 years can access the internet. With children getting connected to the digital world so too the risks that the online world brings to children have exponentially grown. The COVID-19 pandemic increasingly drew African children to the online world, with some accessing the internet for the first time.</p>\n\n<p>Online risks are present 24/7 through devices that enable access to the internet. The situation is exacerbated for children with special needs and disabilities. The international child rights community categorizes online risks to children into 4 categories &ndash; content, contact, conduct and consumer/contract risks (4Cs).</p>\n\n<p>The African Union Commission developed a Child Online Safety and Empowerment Policy which assesses the opportunities and risks related to digital access for children in Africa, as well as the factors influencing child online safety. The Policy sets out the key cross-cutting issues to deliver on children&rsquo;s rights in the digital environment and identifies 10 policy goals for the Continent, ranging from developing institutional capacity and reviewing legal and regulatory frameworks to ensuring corporate responsibility and investing in education and training.</p>\n\n<p>The African Child Online Safety and Empowerment Policy was endorsed by the Executive Council of the African Union during its Forty-Fourth Ordinary Session from 14 - 15 February 2024 in Addis Ababa, Ethiopia.&nbsp; This showcases Africa&rsquo;s pioneering as the first region in the world to devise policy for protecting, empowering and ensuring the safety of children online. Among other things Africa aims to ensure the new technologies serve the needs of our children and harness their incredible potential for the benefit of the continent.</p>\n\n<p>To realize child safety and empowerment, the Policy sets the following objectives and the strategic imperatives for a comprehensive national action plan for the protection of children online, namely: institutional capacity development; legal and regulatory frameworks; Personal data, privacy and identity protection of a child; response and support systems against child exploitation and abuse (CSEA); corporate responsibilities of businesses to uphold children&rsquo;s rights; training and education across the value chain; raising public awareness and communications of online risks; research and development in the child safety area; and most importantly fostering international cooperation to exchange good practices and lessons learned.</p>\n\n<p>Amongst the key recommendations of the policy is the need to affirm strong commitments to child online safety at the highest level in government; strengthening criminal justice frameworks to enable law enforcement and the judiciary to effectively tackle child online safety related offences including child online sexual exploitation and abuse (CSEA); promoting and supporting accessible digital education in schools and for parents, guardians and community leaders; developing and maintaining databases to pool resources and information exchange including hotlines for reporting and victim support; and establishing an African child online resource fund and program.</p>\n\n<p>The Policy calls for a whole society approach to be employed for implementation due to the cross-sectoral, cross-border and transnational nature of the digital environment necessitating strong national, regional, and international cooperation to mitigate the risks arising from the misuse of digital technologies, to ensure that all stakeholders, including States, businesses, and other actors, effectively respect, protect and fulfil children&rsquo;s rights in relation to the digital environment. The need for gathering rigorous data that would lead to development of future evidence-based interventions that strengthen online safety for children with proper attention to all aspects of child rights that are impacted in this digital age.</p>\n\n<p>The policy, and its proposed implementation plan, has been designed to assist African Member States with the development of national child online safety and empowerment policies as well as paving the way for a safer and nurturing online environment for children to ensure an inclusive digital society and economy with active participation of Africa&rsquo;s future generation, the children in key policy areas, including legal, educational, and technical interventions.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>2. AIM AND OBJECTIVES OF THE ASSIGNEMENT </strong></p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<p><strong>The overall objectives of the assignment are as follows:</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Develop and maintain a child-friendly public portal for child online safety and empowerment.&nbsp; The African Union will create a child-friendly and accessible public portal for online safety and digital engagement, covering the full range of child online safety issues as set out in this AU child online safety policy. Targeted messages and materials should be designed in consultation with children, young people and the engagement of parents, policymakers and educators.</p>\n\n<p>&nbsp;</p>\n\n<p>The portal to be accompanied by training materials / manual with the objective of raising awareness, disseminating best practices and building the necessary capacities to allow the safe access and use of the portal by AU Member States.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>3.SCOPE OF WORK</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The firm (consultants) is expected to perform the following activities:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Develop inception report,</li>\n\t<li>Perform desk work assessment of existing regional portals/ platforms related to child online safety and empowerment and identify areas the existing portals covered as well as the missing elements,</li>\n\t<li>Review existing work by RECs, relevant regional Organizations and AUC pertaining to regional / continental child online safety materials to draw inferences from lessons learned of what worked on the ground and what did not work considering the African context,</li>\n\t<li>Develop a continental child-friendly portal to be used by African member states,</li>\n\t<li>Identify practical priority areas in the short, medium and long term. These areas must respond to African users&rsquo; needs, including assisting in deciding the development of a standalone portal or the integration of the developed modules into an existing regional child online safety platform. This determination will consider the need to ensure a minimum of cybersecurity requirements for the portal such as<strong> </strong>encryption, access control, secure authentication, or&nbsp;incident response procedures and standard age-appropriate data protection mechanisms and measures,</li>\n\t<li>The portal should incorporate AI-powered content moderation&nbsp;for detecting cyber threats targeting children,</li>\n\t<li>Develop a User Manual to support the launching of the portal,</li>\n\t<li>Organize a validation workshop on the developed portal involving African experts,</li>\n\t<li>Finalize the portal following experts&rsquo; feedback and recommendations.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>4.EXPECTED DELIVERABLES</strong></p>\n\n<p>&nbsp;</p>\n\n<p>All deliverables, including reports, architecture, plans, and other artifacts, will be submitted shall be provided in both electronic and printed formats to the Infrastructure and Energy Directorate project manager for acceptance and/or approval. The project deliverables and work products shall be as follows:</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p><strong>Deliverables </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p><strong>Deliverables after signing of contract </strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:431.5pt\">\n\t\t\t<p><strong>&nbsp;Development of a child-friendly public portal for online safety and digital engagement</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>1.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>Inception report</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>1 month</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>2.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>Needs assessment, case collection developed, and baseline data compiled&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>2 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>3.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>Child-friendly portal conceptional framework and design (prototype) developed</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>4 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>4. </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>Prototype pilot testing and validation completed</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>6 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>5.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>A Child-friendly portal for child online safety and empowerment developed</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>7 Months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.75pt\">\n\t\t\t<p><strong>6.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:3.25in\">\n\t\t\t<p>A Manual containing portal maintenance and sustainability requirements, best practices, training materials and awareness raising content developed to support the implementation and dissemination of the portal.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:161.75pt\">\n\t\t\t<p>8 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>6.Duration of Assignment</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The duration of the assignment is 8 months</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>FIRM/ CONSULTANTS PROFILE</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The organization will review and assess the corporate-level qualifications of the consulting firm&rsquo;s bidding, based on the criteria and capabilities necessary to be deemed competent and reliable for delivering high-level services or products, particularly for strategic projects such as the development of a child-friendly online public portal.</p>\n\n<p>The following key qualifications will be required for the firm:</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Organizational Experience: </strong></p>\n\n<p><strong>Proven Track Record</strong>: Demonstrated in prior assignments on the development of a child-friendly online public portal for online safety and digital engagement. The firm should have relevant 10 years of experience in child online public portal development at national / regional levels.</p>\n\n<p><strong>Demonstrated </strong>success in managing and delivering at least 3 similar projects or services with similar scope and activities, preferability at national, regional and/or continental levels.</p>\n\n<p><strong>Technical and Professional Capabilities: </strong></p>\n\n<p><strong>Qualified Personnel</strong>: A team of skilled professionals with relevant expertise, including advanced degrees, certifications, and practical experience in the area concerned.</p>\n\n<p><strong>Technical Resources</strong>: Access to the latest technology, tools, and methodologies required to execute projects effectively.</p>\n\n<p><strong>Financial Stability: </strong></p>\n\n<p><strong>Financial Health</strong>: Strong financial standing with evidence of profitability, financial management practices, and the ability to sustain operations and project delivery over time. <strong>Insurance and Liability Coverage</strong>: Adequate insurance coverage, including professional liability insurance, to protect against potential risks.</p>\n\n<p><strong>Quality Assurance: </strong></p>\n\n<p><strong>Certifications</strong>: Relevant industry certifications such as ISO 9001 for quality management systems or other standards that demonstrate commitment to quality.</p>\n\n<p><strong>Processes and Methodologies</strong>: Established processes and methodologies for project management, quality control, and continuous improvement.</p>\n\n<p><strong>Compliance and Risk Management: </strong></p>\n\n<p><strong>Regulatory Compliance</strong>: Adherence to relevant laws, regulations, and standards within the industry.</p>\n\n<p><strong>Risk Management Practices</strong>: Well-defined risk management procedures to identify, assess, and mitigate potential risks associated with projects.</p>\n\n<ul>\n\t<li><strong>Client References and testimonials</strong>:</li>\n</ul>\n\n<p><strong>References</strong>: Positive references and testimonials from previous or current clients, demonstrating the firm&rsquo;s reputation and reliability.</p>\n\n<p><strong>Case Studies</strong>: Detailed case studies showcasing successful project delivery and &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<p>outcomes.</p>\n\n<p>&nbsp;<strong>Organizational Structure: </strong></p>\n\n<p><strong>Effective Management</strong>: An effective organizational structure with clear roles and responsibilities, ensuring efficient project management and execution.</p>\n\n<p><strong>Support Systems</strong>: Robust support systems for administrative, logistical, and operational functions.</p>\n\n<p><strong>Project Management Expertise: </strong></p>\n\n<p><strong>Project Management Certifications</strong>: Certifications such as PMP (Project Management Professional) or similar credentials that validate expertise in project management. <strong>Track Record of Delivery</strong>: Proven ability to deliver projects on time, within budget, and to the required quality standards.</p>\n\n<p><strong>Communication and Collaboration: </strong></p>\n\n<p><strong>Stakeholder Engagement</strong>: Skills in engaging and managing relationships with various stakeholders, including clients, vendors, and team members.</p>\n\n<p><strong>Reporting and Documentation</strong>: Ability to provide clear and comprehensive reports and documentation throughout the project lifecycle.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Consultant&rsquo;s Team Composition&nbsp;&nbsp; </strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Bidder shall provide detailed information on the structure and composition of the team, including a list of advisors, the on-site team, and relevant technical and administrative support staff, along with their roles and deployment across various project phases.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Team Leader:</strong> <strong>Senior online portal designer and developer </strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The team leader should meet the following requirements:</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Educational Background</strong></p>\n\n<p>&nbsp;</p>\n\n<p>An advanced university /Engineering degree in the following fields:</p>\n\n<ul>\n\t<li>Telecommunications/Computer &amp; Software Engineering /Compute Science</li>\n\t<li>Business management and IT</li>\n\t<li>Database/Software Applications and Management</li>\n\t<li>Diploma/ Certification in state-of-the-art platform / portal designs and content creation.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Professional Experience</strong></p>\n\n<ul>\n\t<li>It is envisaged that the team leader should have at least 10 years of working experience, of which at least 7 years in developing national/ regional portals for like-minded organizations in the development of regional portals along with their implementation, maintenance/ sustainability and launching plans,</li>\n\t<li>Proven practical experience and expertise in successfully undertaking similar projects and assignments,</li>\n\t<li>At least 5 years of relevant experience in the African region regarding Child Online Safety and Empowerment landscape trends, principles, challenges, priorities and indicators,</li>\n\t<li>Good knowledge of the AU / African context preferred.</li>\n</ul>\n\n<p><strong>Knowledge and Expertise</strong></p>\n\n<ul>\n\t<li>Demonstrated ability to acquire and access up-to-date relevant data to support the assignment,</li>\n\t<li>Experience in integrating, demonstrating and processing relevant data/content visually and graphically,</li>\n\t<li>Extensive knowledge in requirements gathering, design, launching and maintaining of similar portals/ platforms connected to African child online safety and empowerment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Stakeholder Engagement</strong></p>\n\n<ul>\n\t<li>Excellent communication and negotiation skills to engage with a diverse range of stakeholders,</li>\n\t<li>Ability to build and maintain relationships with governmental bodies, industry partners, pertinent regional institutions and civil society.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Global Perspective</strong></p>\n\n<ul>\n\t<li>Awareness of international developments and trends in the child online safety and its related policies and strategies.</li>\n\t<li>Ability to apply global best practices to the African context.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Problem-Solving Skills</strong></p>\n\n<ul>\n\t<li>Analytical mindset to identify and solve complex challenges in the areas of focus,</li>\n\t<li>Excellent report writing skills in English, ability to produce concise reports,</li>\n\t<li>Excellent interpersonal, presentation and communication skills, both orally and in writing,</li>\n\t<li>Proficiency in the use of standard office software packages, email and internet.</li>\n</ul>\n\n<p><strong>Collaboration and Teamwork</strong></p>\n\n<ul>\n\t<li>Ability to work collaboratively within teams and across AU / WB departments,</li>\n\t<li>Experience in mentoring and guiding team members and junior professionals.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Language Skills</strong></p>\n\n<ul>\n\t<li>Advanced level English or French is required and Proficiency in other official languages of the AU in both spoken and written communication will be considered an added advantage.</li>\n</ul>\n\n<p><strong>Junior online portal designer and developer </strong></p>\n\n<p>&nbsp;</p>\n\n<p>The junior online designer and developer should meet the following requirements:</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Educational Background</strong></p>\n\n<p>Bachelor&rsquo;s degree in the following fields:</p>\n\n<ul>\n\t<li>Telecommunications/Computer &amp; Software Engineering /Compute Science</li>\n\t<li>Business management and IT</li>\n\t<li>Database/Software Applications and Management</li>\n\t<li>Diploma/ Certification in state-of-the-art platform / portal designs and content creation.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Professional Experience</strong></p>\n\n<ul>\n\t<li>It is envisaged that the junior portal designer and developer should have at least 5 years of working experience, of which at least 3 years in the area of developing national/ regional portals for like-minded organizations in the development of regional portals along with their implementation, maintenance/ sustainability and launching plans,</li>\n\t<li>Proven practical experience and expertise in successfully undertaking similar projects and assignments,</li>\n\t<li>At least 3 years of relevant experience in the African region regarding Child Online Safety and Empowerment landscape trends, principles, challenges, priorities and indicators,</li>\n\t<li>Good knowledge of the AU / African context preferred.</li>\n</ul>\n\n<p><strong>Knowledge and Expertise</strong></p>\n\n<ul>\n\t<li>Demonstrated ability to acquire and access up-to-date relevant data to support the assignment,</li>\n\t<li>Experience in integrating, demonstrating and processing relevant data/content visually and graphically,</li>\n\t<li>Extensive knowledge in requirements gathering, design, launching and maintaining of similar portals/ platforms connected to African child online safety and empowerment.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Stakeholder Engagement</strong></p>\n\n<ul>\n\t<li>Excellent communication and negotiation skills to engage with a diverse range of stakeholders,</li>\n\t<li>Ability to build and maintain relationships with governmental bodies, industry partners, pertinent regional institutions and civil society.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Global Perspective</strong></p>\n\n<ul>\n\t<li>Awareness of international developments and trends in the child online safety and its related policies and strategies,</li>\n\t<li>Ability to apply global best practices to the African context.</li>\n</ul>\n\n<p><strong>Problem-Solving Skills</strong></p>\n\n<ul>\n\t<li>Analytical mindset to identify and solve complex challenges in the areas of focus,</li>\n\t<li>Excellent report writing skills in English, ability to produce concise reports,</li>\n\t<li>Excellent interpersonal, presentation and communication skills, both orally and in writing,</li>\n\t<li>Proficiency in the use of standard office software packages, email and internet.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Collaboration and Teamwork</strong></p>\n\n<ul>\n\t<li>Ability to work collaboratively within teams and across AU / WB departments,</li>\n\t<li>Experience in mentoring and guiding team members and junior professionals.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Language Skills</strong></p>\n\n<ul>\n\t<li>Advanced level English or French is required and Proficiency in other official languages of the AU in both spoken and written communication will be considered an added advantage.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Data, Services, and facilities to be provided by the Client</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The organization will provide all relevant existing documents to facilitate the consulting firm&rsquo;s work and will also offer office space for the consulting team.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Client&rsquo;s Management Arrangement</strong></p>\n\n<p>&nbsp;</p>\n\n<p>Consultant will report to the Director I&amp;E. The consultant firm reviews of progress will be done at each stage of the progress (from Inception, milestones stages to the final product delivery).</p>\n\n<p>&nbsp;</p>"},{"id":"OP00358348","notice_type":"Request for Expression of Interest","noticedate":"19-May-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-06-06T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Papua New Guinea","project_id":"P174637","project_name":"Child Nutrition and Social Protection Project","bid_reference_no":"PG-DFCDR-489507-CS-CQS","bid_description":"Consultancy Services for Enhancement of the Nextgen Beneficiary Management Systems for Program Scale Up and Integration of Additional Functions","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"P.O Box 7354, Boroko, Sambra Haus, Kumul Avenue, Waigani, 675 Port Moresby, Papua New Guinea","contact_ctry_name":"Papua New Guinea","contact_email":"nanplasj@gmail.com","contact_name":"Joseph Klapat","contact_organization":"Department of Community Development and Religion","contact_phone_no":"72122292","contact_web_url":"http://www.dfcd.gov.pg","submission_date":"2025-05-19T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p><strong>Country: </strong>Independent State of<strong> </strong>Papua New Guinea</p>\n\n<p><strong>Name of Project: </strong>Child Nutrition and Social Protection Project (CNSP)</p>\n\n<p><strong>Loan No./Credit No:</strong> 7072</p>\n\n<p><strong>Implementing Agency: </strong>Department for Community Development and Religion (DfCDR)</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Assignment Title: Consultancy Services for Enhancement of the Nextgen Beneficiary Management Systems for Program Scale Up and Integration of Additional Functions &nbsp;</strong></p>\n\n<p><strong>Reference No</strong>. <strong>(as per Procurement Plan):</strong> PG-DFCDR-489507-CS-CQS &nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Government of the Independent State of Papua New Guinea has received financing from the World Bank, in the amount of US$90 million for the Child Nutrition and Social Protection Project and intends to apply part of the proceeds for consulting services</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The primary objective of this assignment is to support the implementation and scale up of the CNSP program through the strengthening of the MIS</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Duration of the Assignment is expected to be 12 months from the date of signing the contract.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The detailed Terms of Reference (TOR) for the assignment can be obtained at the address given below.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Department for Community Development and Religion (DfCDR) now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The firm should possess the following qualifications and experience criteria:</li>\n</ol>\n\n<ul>\n\t<li>Technical and managerial organization of the firm</li>\n\t<li>Core business &ndash; Experience in working with e-Government and digital transformation programs and years of business</li>\n\t<li>Sector-specific experience and expertise in social protection programs</li>\n\t<li>Adequacy of the assignment - Understanding of social protection delivery systems, digital payments and community level data collection and management</li>\n\t<li>Training program knowledge in PNG or Pacific Island Countries (PIC)</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Note: </strong></p>\n\n<ol>\n\t<li>Key Experts will not be evaluated at the shortlisting stage.</li>\n\t<li>While indicating information relating to (proven experience), it shall be made clear whether responsibility of the firm was in the capacity of a principal firm (lead partner) or as an associated firm (sub-consultant/JV partner) with detail delineation of the scope of the services.</li>\n\t<li>Firms submitting their EoI response as Joint Venture (JV) will be evaluated individually for all of the above criteria, while only lead firm will be evaluated in case of a submission with sub-consultancy or consortium.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; 5th Edition, September 2023 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>A Consultant will be selected in accordance with the Consultant Qualification Selection (CQS) method as set out in Section VII, paragraph 7.3 of World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo;, 5th Edition September 2023 (Procurement Regulations) and to be specifically set out in the Request for Proposals.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Further information can be obtained at the address below during office hours: 0900 to 1600 hours.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Expressions of interest must be delivered in a written form to the address below by email, by 06&nbsp;June 2025 at 1700 hrs. PNG Time.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>Department </em><em>for Community Development and Religion </em></p>\n\n<p><em>Attn: Project Manager</em></p>\n\n<p><em>Waigani, Port Moresby</em></p>\n\n<p><em>Papua New Guinea</em></p>\n\n<p><em>E-mail: </em><u>josephklapat@gmail.com </u><em>with a copy to: </em>procurement.cnsp@gmail.com&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>==================================================================</p>\n\n<p>Terms of Reference (TOR)</p>\n\n<p>&nbsp;</p>\n\n<p><strong>TITLE</strong><strong>: </strong><strong>ENHANCEMENT OF THE NEXTGEN BENEFICIARY MANAGEMENT SYSTEMS FOR PROGRAM SCALE UP AND INTEGRATION OF ADDITIONAL FUNCTIONS</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>PROJECT: CHILD NUTRITION SOCIAL PROTECTION PROJECT (CNSP) PROJECT</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>CLIENT: DEPARTMENT OF COMMUNITY DEVELOPMENT AND RELIGION</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>PORT MORESBY</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>DURATION: July 2025 &ndash; June 2026</strong></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Background</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The Department of Community Development and Religion (DfCDR) &ndash; with support from the World Bank</p>\n\n<ul>\n\t<li>has developed and implemented the Beneficiary Management System for the Child Nutrition and Social Protection (CNSP) Project to support administration and delivery of the child nutrition grant. The Beneficiary Management System &ndash; also referred to as the CNSP or NextGen MIS &ndash; currently supports the delivery chain for the program, including data collection, validation, processing and reporting of information for the provision of social protection services from the community and ward level through to the national administrative level.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The Child Nutrition and Social Protection (CNSP) Project &ndash; branded as NextGen &ndash; is a Government of Papua New Guinea (GoPNG) initiative, which aims to improve utilization of priority nutrition interventions and purchasing power of first thousand-day households in selected districts. It has three components.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>Component 1 </strong>&ndash; strengthening health systems to deliver nutrition-specific services and implementation of a multi-sectoral community-based approach to reduce stunting, implemented by the National Department of Health (NDOH)</li>\n\t\t<li><strong>Component 2 </strong>&ndash; design and implementation of a nutrition grant targeting first 1,000 days of life households, implemented by The Department of Community Development and Religion</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>(DfCDR)</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>Component 3 </strong>&ndash; support for a national level advocacy and coordinate cross-sectoral support at the national level to promote multi-sectoral nutrition interventions delivery at the community level, in addition to institutional strengthening and capacity building, implemented by the Department of Justice and Attorney General (DJAG)</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The target beneficiaries and recipients of the child grant are pregnant women or caretakers of young children under the age of 2. In terms of geographic coverage, the project will focus on a subset of provinces and districts that have strong commitment and reasonable local capacity for implementation. A phased approach of the program will follow to gradually expand the operation in 19 districts. For the pilot implementation period in 2024, four (4) districts were selected by GoPNG &ndash; North Fly District of Western Province (Southern Region), Kundiawa-Gembogl District of Chimbu Province (Highlands Region), Madang District of Madang Province (Momase Region), and Gazelle District of East New Britain Province (Islands Region). Payment service providers (PSPs) play an important role in opening new accounts and distributing the grant to beneficiaries. Benefits are paid through digital payment channels facilitated by the PSPs. To promote optimal use of the cash transfer, recipients are informed of the purpose of the benefit, how much, when, and for how long they can expect to receive the transfers to help them make informed choices on how to wisely spend the government assistance.</p>\n\n<p>&nbsp;</p>\n\n<p>The effective and efficient delivery of the child nutrition grant is underpinned by the Beneficiary Management System that enables the provision of social protection services reliably, regularly, accessibly and securely by the DfCDR. The department is now seeking a technology company and partner to support the development, implementation and rollout of additional functions, modules and services for the CNSP MIS as a foundational step towards integrated information management for social protection delivery.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Objectives</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The primary objective of this assignment is to support the implementation and scale up of the CNSP program through the strengthening of the MIS. The CNSP MIS is designed to support the Program Operations Manual by facilitating the following aspects of the social protection delivery chain:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>Registration: </strong>Community Development Workers (CDWs) will facilitate the data collection and validation of potential beneficiaries on a standard registration form, including personal, demographic, eligibility, payment account details and the upload of photographic and supporting documents. The registration form will be submitted digitally on a mobile devices, including in an offline mode if there is no network connectivity.</li>\n\t\t<li><strong>Beneficiary Enrolment. </strong>The validated registration form is reviewed for eligibility verification via an approvals workflow, which will include review and authorization by DfCDR officers at the district and provincial level. Once approved, the details of the beneficiary will be included on the beneficiary registry.</li>\n\t\t<li><strong>Beneficiary Registry Management and Updates / Exits. </strong>The beneficiary record will need to be kept current and updated to facilitate benefit and services delivery. The Beneficiary Registry module will maintain a comprehensive view of the beneficiary record and all associated details, payments and information records. Changes to the beneficiary record and their eligibility status, including change in eligibility status or death will be processed to ensure the registry is current.</li>\n\t\t<li><strong>Complementary Services Management. </strong>The MIS will be able to set up and track delivery of complementary services, such as financial literacy and Social Behavioral Change Communications (SBCC), at the community level.</li>\n\t\t<li><strong>Payments. </strong>The CNSP MIS will facilitate cash transfers to beneficiaries through the calculation and generation of a payment list that is integrated with payment service providers (PSPs) for disbursement, transfer status and reconciliation, and beneficiary account validation.</li>\n\t\t<li><strong>Complaints Management. </strong>Capture grievances lodged from the community level and process the record through the MIS workflow through to resolution.</li>\n\t\t<li><strong>Monitoring and Reporting. </strong>Program performance, beneficiary registry analytics and results monitoring for consolidated and disaggregated / aggregated data to provide insight on the profile of beneficiaries and the services they received.</li>\n\t\t<li><strong>Mobile Client. </strong>A secure access for authorized users (CDWs and VHAs) will be enabled to use a cut-down version of the NextGen dataset and functions on a mobile device, including facilitating data collection through mobile forms for Registration, Updates, Household Monitoring, SBCC attendance, and Complaints. The mobile solution will be able to collect data in an offline mode when there is no network connectivity and later sync to the centralized MIS database when connected.</li>\n\t\t<li><strong>Data Hierarchy and Accountability. </strong>DFCDR administrators at the central level will have oversight of data across all regions, but the sub-national users will be responsible for collecting and validating beneficiary information at the local levels and only be able to view the data within their jurisdiction. Accountability controls will facilitate approvals workflow for data collected by CDWs or VHAs at the local level and then appropriately reviewed and/or approved at the district, provincial or national levels.</li>\n\t\t<li><strong>Infrastructure hosting. </strong>A robust hosting solution for the MIS will be provided by the GoPNG, including network monitoring of outages, performance and security incidents. The solution will facilitate appropriate firewall and security protocols are in place, as well as a robust backup and disaster recovery mechanism.</li>\n\t\t<li><strong>Source code ownership. </strong>The full source code of the MIS will be owned by the GoPNG, specifically DfCDR, without any conditions. A suitable source code repository will facilitate code versioning and deployments for the MIS.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Scope of Work</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The selected firm will be responsible for the following tasks:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Delivery of Integration Services: </strong>Facilitate integration of the MIS with external systems and services that require data exchange for service provision and/or reporting\n\n\t<ul>\n\t\t<li>Implement new and extend existing API (Application Programming Interface) solutions\n\t\t<ul>\n\t\t\t<li>Integration with PSP for payment transfer and account status check</li>\n\t\t\t<li>Integration with PSP to enable MIS users to facilitate bank account opening during registration data collection.</li>\n\t\t\t<li>Integration with monitoring and reporting platforms and performance dashboards.</li>\n\t\t\t<li>Integration with the Mobile interface and sync functionality</li>\n\t\t</ul>\n\t\t</li>\n\t\t<li>Work with technical teams supporting partner systems to design, test and operationalize all</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>integration solutions, including the production of detailed design documentation with sample files and messages, location and access for log files, exceptions handling and common errors encountered.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Extend the MIS functionality to support other requests for data exchange</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Design and Implementation of Mobile-Ready Modules:</strong>\n\n\t<ul>\n\t\t<li>The Mobile solution will integrate with the CNSP MIS to facilitate data collection at the community level, including operating in an offline mode with a SYNC through to the CNSP MIS seamlessly triggered when the device is connected to the Internet.</li>\n\t\t<li>Each device will need to authenticate the user logging in &ndash; a key will be generated at first login to pull all reference data associated with the user for that specific location</li>\n\t\t<li>A HOMEPAGE on the mobile solution will expose all mobile modules or functions that is available for that user profile logged in.</li>\n\t\t<li>Ability to conduct data collection on mobile forms on the following modules that will be</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>accessed by CDWs and VHAs:</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>\n\t\t<ul>\n\t\t\t<li>Registration</li>\n\t\t\t<li>Updates</li>\n\t\t\t<li>SBCC Attendance</li>\n\t\t\t<li>Household Monitoring</li>\n\t\t\t<li>Complaints</li>\n\t\t</ul>\n\t\t</li>\n\t\t<li>Develop wireframes, prototypes, and design documentation of the module enhancements for DfCDR approval.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Enhancements to Web-based MIS functions. </strong>Manage the requirements, design change and implementation for enhancements to the existing web-based modules and processes based on feedback from the project pilot:\n\n\t<ul>\n\t\t<li>Review opportunities to update or streamline the approvals processes, workflow triggers and referrals on the MIS, specifically for the Registration, Updates and Complaints modules.</li>\n\t\t<li>Enhance the reporting module and dashboards to enable users to generate specific reports and dashboard views based on data filters, such as location, age, gender, household status, and other</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>relevant indicators</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Develop wireframes, prototypes, and design documentation of the module enhancements for</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>DfCDR approval.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>End-to-End System Integration Testing and Quality Assurance: </strong>Manage the quality assurance of the CNSP MIS, including integration and service delivery at the community level through to national level administration.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Conduct rigorous testing, including user acceptance testing (UAT), to ensure that the system meets all functional and non-functional requirements to meet the project operations manual and delivery chain.</li>\n\t\t<li>Verify seamless data flow from the community level through to national level systems and across all MIS modules and integration points.</li>\n\t\t<li>Address any issues identified during the testing phase, ensuring the system is robust and reliable.</li>\n\t\t<li>Assess system performance (responsiveness), including load handling, and scalability under simulated conditions.</li>\n\t\t<li>Validate the system security, including authentication controls, data encryption, and access permissions to safeguard beneficiary information.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Training and Documentation: </strong>The selected firm will be responsible for developing and delivering comprehensive training and user documentation to ensure that program staff across all levels &ndash; national, provincial, district, and community&mdash;can effectively use the CNSP MIS and associated tools.\n\n\t<ul>\n\t\t<li>Develop a training schedule and plan that identifies the training needs across the different user groups (from CDWs and VHAs through to National Level Payments Team).</li>\n\t\t<li>Deliver Provide training for CNSP Project stakeholders on how to effectively use the integrated system, with a focus on interpreting CNSP-specific data and reports.</li>\n\t\t<li>Deliver Training of Trainers (ToT) to build capacity among selected DfCDR staff to serve as</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>future trainers</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Deliver comprehensive user manuals and system documentation, including system architecture, technical design, outputs and standards. Maintain a system for regularly updating documentation and training materials as the system evolves.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Deployment and Support: </strong>The selected firm will be responsible for managing the successful deployment of the CNSP MIS and its components across project pilot and scale-up locations.\n\n\t<ul>\n\t\t<li>Develop a detailed deployment plan to correspond with the project rollout in pilot districts and wards, including introduction of new functionality and the configuration of users and device</li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>setup for community level operations.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li>Coordinate phased implementation across all participating provinces and districts, ensuring readiness of infrastructure, devices, trained personnel, and administrative data.</li>\n\t\t<li>Manage updates, patches, and system optimizations in coordination with the DfCDR MIS team during the pilot scale up phase.</li>\n\t\t<li>Work with DfCDR team to establish a user feedback mechanism to continuously capture address system issues and opportunities for improvement.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Key Deliverables</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The firm is expected to deliver the following:</p>\n\n<p>The following key deliverables will be delivered by the &nbsp;firm:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Anticipated effort</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key deliverable 1: </strong>Submission of a project workplan</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>One week from commencement of assignment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable 2:</strong></p>\n\n\t\t\t<p><strong>Design documentation </strong>for the upgraded mobile and web components and modules of the MIS, including functional and non-functional design requirements, process flows, and mock-ups where relevant.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Four weeks (or Month 1) after submission and acceptance of key deliverable 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable 3:</strong> <strong>System Integration Test Plan and Test Results Report, </strong>including defect logs, resolution actions, and sign-off from DfCDR.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Seven weeks (or Month 3) after submission and acceptance of key deliverable 2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable 4: </strong><strong>Training Materials and Train of Trainers (ToT) Package, </strong>including role-specific user guides, presentation slide decks, video tutorials (where necessary) and a ToT facilitator manual.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Eight weeks (or Month 5) after submission of key deliverable 3</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable </strong><strong>5</strong>: <strong>System Documentation,</strong> including both technical (e.g., system architecture, APIs) and functional (e.g., workflows, permissions) aspects.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Within twenty weeks (or Month 11) after submission and acceptance of key deliverable 3.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Key Deliverable 6: </strong><strong>Post-Deployment Review and Recommendations Report, </strong>capturing lessons learned, improvement areas, and a roadmap for future enhancements.</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Before the expiry date of the assignment or on Month 12.&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Shortlisting criteria of the firm</li>\n</ol>\n\n<p>The following criteria will be used to shortlist a firm:</p>\n\n<p>5.1 Qualifications and Experience of the firm</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Technical and managerial organization of the firm</li>\n\t<li>Core business &ndash; Experience in working with e-Government and digital transformation programs and years of business</li>\n\t<li>Sector-specific experience and expertise in social protection programs</li>\n\t<li>Adequacy of the assignment - Understanding of social protection delivery systems, digital payments and community level data collection and management</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>5.2 Proposed team key experts</strong> <strong>No</strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<thead>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:22.65pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:22.65pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p><strong>Resource</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:22.65pt; vertical-align:top; width:191.45pt\">\n\t\t\t<p><strong>Skillsets</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:22.65pt; vertical-align:top; width:161.55pt\">\n\t\t\t<p><strong>Required Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</thead>\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:288.35pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:288.35pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p>Lead Software Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:288.35pt; vertical-align:top; width:191.45pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Full stack development</li>\n\t\t\t\t<li>Team leadership</li>\n\t\t\t\t<li>Technology stack and DevOps management</li>\n\t\t\t\t<li>Ability to support team on best</li>\n\t\t\t</ul>\n\n\t\t\t<p>practice on development processes, including appropriate commenting on code, continuous testing, code</p>\n\n\t\t\t<p>reviews, etc.</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Ability to act as the central point of</li>\n\t\t\t</ul>\n\n\t\t\t<p>contact for development approach and plans</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:288.35pt; vertical-align:top; width:161.55pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Act as a full-stack developer with at least 5 years of</li>\n\t\t\t</ul>\n\n\t\t\t<p>experience, proficient in:</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>JavaScript, NodeJS, AngularJS, PHP, HTML, CSS, AJAX.</li>\n\t\t\t\t\t<li>Node.js and Laravel (PHP) frameworks.</li>\n\t\t\t\t\t<li>Database management systems such as MySQL, PostgreSQL, and others.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li>Utilize expertise in WebServices/WebAPI</li>\n\t\t\t</ul>\n\n\t\t\t<p>(RESTful) and code repository management (GitHub/BitBucket).</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Ensure robust integration and smooth operation of the CNSP</li>\n\t\t\t</ul>\n\n\t\t\t<p>MIS within the cloud or dedicated hosting</p>\n\n\t\t\t<p>environments.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:50.6pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:50.6pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p>Mobile Application Developer</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:50.6pt; vertical-align:top; width:191.45pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Expertise in mobile application</li>\n\t\t\t</ul>\n\n\t\t\t<p>development, cross-platform</p>\n\n\t\t\t<p>frameworks (e.g., Flutter, React Native), UI/UX design</p>\n\t\t\t</td>\n\t\t\t<td style=\"border-color:black; height:50.6pt; vertical-align:top; width:161.55pt\">\n\t\t\t<ul>\n\t\t\t\t<li>5+ years in mobile app</li>\n\t\t\t</ul>\n\n\t\t\t<p>development, with a portfolio of similar projects</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:75.8pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:75.8pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p>Additional Senior / Junior Full Stack Developers</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:75.8pt; vertical-align:top; width:191.45pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Expertise in front-end and back-end development and database</li>\n\t\t\t</ul>\n\n\t\t\t<p>management</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Experience with APIs, middleware, data integration, and system</li>\n\t\t\t</ul>\n\n\t\t\t<p>interoperability</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:75.8pt; vertical-align:top; width:161.55pt\">\n\t\t\t<ul>\n\t\t\t\t<li>5+ years in full-stack development, with proficiency</li>\n\t\t\t</ul>\n\n\t\t\t<p>in systems integration, JavaScript, PHP, etc.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:151.8pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:151.8pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p>Business Analyst / Quality Assurance Specialist</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:151.8pt; vertical-align:top; width:191.45pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Proficiency in developing design</li>\n\t\t\t</ul>\n\n\t\t\t<p>documentation, including process diagrams, database and integration design definition, etc.</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Proficiency in the definition of Quality Assurance approach and associated</li>\n\t\t\t</ul>\n\n\t\t\t<p>testing documentation, including test plans, test coverage and test cases</p>\n\n\t\t\t<ul>\n\t\t\t\t<li>Proficiency in executing and</li>\n\t\t\t</ul>\n\n\t\t\t<p>managing automated and manual</p>\n\n\t\t\t<p>testing, user acceptance testing (UAT), and mobile application testing</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:151.8pt; vertical-align:top; width:161.55pt\">\n\t\t\t<ul>\n\t\t\t\t<li>5+ years in supporting design and QA, with experience in</li>\n\t\t\t</ul>\n\n\t\t\t<p>supporting and testing complex systems and mobile</p>\n\n\t\t\t<p>applications</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"border-color:black; height:50.3pt; vertical-align:top; width:27.0pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:50.3pt; vertical-align:top; width:99.1pt\">\n\t\t\t<p>Technical Writer</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:50.3pt; vertical-align:top; width:191.45pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Strong documentation skills,</li>\n\t\t\t</ul>\n\n\t\t\t<p>experience in creating user guides, technical manuals, and knowledge</p>\n\n\t\t\t<p>transfer documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:50.3pt; vertical-align:top; width:161.55pt\">\n\t\t\t<ul>\n\t\t\t\t<li>5+ years in an analyst, support</li>\n\t\t\t</ul>\n\n\t\t\t<p>or technical writing role, particularly for IT systems</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>At various stages of the project, non -key experts may be required to support the above core resources:</p>\n\n<ul>\n\t<li><strong>UX/UI Consultants </strong>&ndash; Expertise in user experience and user interface design, wireframing, prototyping, user testing across mobile and web applications</li>\n\t<li><strong>Software / Application Architects </strong>&ndash; provide guidance and feedback on the development architecture and frameworks to be used</li>\n\t<li><strong>Infrastructure architect / engineers </strong>&ndash; Define the appropriate web application hosting solutions</li>\n</ul>\n\n<p>for testing and live environments. Experience with both cloud and on-site client dedicated server hosting solutions are essential</p>\n\n<ul>\n\t<li><strong>Project coordinator / administrator </strong>&ndash; planning and coordination skills, with experience in managing IT development projects</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Timeline</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>The project is expected to commence in July 2025 and be completed by June 2026. The selected company should submit a detailed project timeline depicting only the development phase with options for maintenance /service (SLAs) as part of the proposal.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Reporting and Communication</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>The company will report to the DfCDR Component Manager of the project</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Regular progress meetings will be held [weekly/bi-weekly] to review the project status and address any issues with the DfCDR project manager and MIS team.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00351409","notice_type":"Request for Expression of Interest","noticedate":"10-Apr-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-05-02T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P171967","project_name":"Regional Infrastructure Finance Facility (RIFF) Project","bid_reference_no":"ZM-COMESA -445856-CS-LCS","bid_description":"Procurement of Electronic Document Management System","procurement_group":"CS","procurement_method_code":"LCS","procurement_method_name":"Least Cost Selection","contact_address":"Ben Bella Road, P. O. Box 30051, Lusaka","contact_ctry_name":"Zambia","contact_email":"melginaid@gmail.com","contact_name":"Mohamed Kheir  Elginaid","contact_organization":"COMESA","contact_phone_no":"+260779791783","submission_date":"2025-04-10T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p>\n\n<p><strong>(CONSULTING SERVICES - FIRMS SELECTION)</strong></p>\n\n<p><strong>IMPLEMENTING AGENCY: COMMON MARKET FOR EASTERN AND SOUTHERN&nbsp;&nbsp;&nbsp; </strong></p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; AFRICA ( COMESA) </strong></p>\n\n<p><strong><em>NAME OF&nbsp; </em></strong><strong>PROGRAM: &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;REGIONAL INFRASTRUCTURE FINANCE&nbsp; FACILITY </strong></p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (RIFF) PROJECT </strong></p>\n\n<p><strong>PROJECT&nbsp; ID</strong> : <strong>P180547</strong></p>\n\n<p><strong>ASSIGNMENT TITLE: PROCUREMENT OF AN ELECTRONIC DOCUMENT MANAGEMENT SYSTEM.&nbsp;&nbsp; </strong><strong>REFERENCE NO. ZM-COMESA -445856-CS-LCS </strong></p>\n\n<p><strong>1.0&nbsp; INTRODUCATION </strong></p>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased co-operation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>Currently, information management is manual with offices filling with files, extra storage spaces that are quickly running out, and low accountability on records management. Manual management of records has been time consuming as the retrieval mechanisms are tedious, document loss has been witnessed occasioning repeat processes, inefficiency, and delayed decisions. Duplication of information has become common as divisions are not able to establish whether the same information exists in other divisions, and this has added to the costs of managing information.</p>\n\n<p>Therefore, the COMESA Secretariat is planning to acquire an Electronic Document Management System to digitize the management of documents.</p>\n\n<p><strong>&nbsp;2.0&nbsp; OBJECTIVE OF THE ASSIGNMENT </strong></p>\n\n<p>The COMESA Secretariat is planning to acquire an Electronic Document Management System to digitize the management of documents. The system shall assist the Secretariat to strengthen its processes with a view to ensuring that it is efficient and effective in its operations. It is expected that An Electronic Document Management System at COMESA will achieve the following:</p>\n\n<ul>\n\t<li><strong>Processes:</strong> Manual processes should be automated to achieve effectiveness and efficiency</li>\n\t<li><strong>Accessibility:</strong> Staff should be able to access authorized documents anytime and from anywhere. Storage should be centralized.</li>\n\t<li><strong>Integration:</strong> The application should be able to fully integrate with current and future relevant application systems.</li>\n\t<li><strong>Data Integrity and Security:</strong> Data Integrity and Security should be enhanced through proper access controls and other electronic means. The manual system does not adequately protect information assets.&nbsp;&nbsp;</li>\n\t<li><strong>Scalability:</strong> All applications/systems at COMESA should be able to accommodate new features/modules to meet the changing organization needs.</li>\n\t<li><strong>Electronic Signatures:</strong> Ability to incorporate different forms of electronic signatures including digital signatures.</li>\n</ul>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest </strong></p>\n\n<p><strong>3.0 SHORT</strong><strong>LISTING CRITERIA</strong></p>\n\n<p>The Common Market for Eastern and Southern Africa&nbsp; now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria is&nbsp; as follows;</p>\n\n<p>&nbsp;&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:439.85pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:13.9pt; vertical-align:top; width:28.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.9pt; vertical-align:top; width:411.15pt\">\n\t\t\t<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Evaluation CRITERIA</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:28.7pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:411.15pt\">\n\t\t\t<p>The firm&rsquo;s core business ( Submit company profile)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:62.4pt; vertical-align:top; width:28.7pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:62.4pt; vertical-align:top; width:411.15pt\">\n\t\t\t<p><strong>Experience of the firm </strong></p>\n\n\t\t\t<p>Evidence of having carried out implementation and support of electronic document management system (Name, scope and cost of precious comparable similar assignments and client contact details -email, physical address&nbsp; and&nbsp; details of the contact person) &nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.6pt; vertical-align:top; width:28.7pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.6pt; vertical-align:top; width:411.15pt\">\n\t\t\t<p>Technical and managerial capability of the firm to manage&nbsp; the assignment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.6pt; vertical-align:top; width:28.7pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.6pt; vertical-align:top; width:411.15pt\">\n\t\t\t<p>Eligibility</p>\n\n\t\t\t<p>(Firms must not&nbsp; be debarred or sanctioned by the World Bank)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; Fifth Edition of September 2023.&nbsp;&nbsp;</p>\n\n<p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>A Consultant will be selected in accordance with <em>the Least</em><em> Cost Selection </em>method set out in the Procurement Regulations Fifth Edition of September 2023.&nbsp;&nbsp;</p>\n\n<p>Further information can be obtained at the address below during office hours from<em> 09:00 to 16:00 hours</em> Monday to Thursday, on Fridays from <em>09:00</em><em> to 12:30 </em><em>hours Zambian time except for weekends and Public Holidays. Address:</em>&nbsp; Head of Procurement, COMESA Secretariat, Ben Bella Road, Lusaka, Zambia.</p>\n\n<p>&nbsp;Email address:&nbsp; procurement@comesa.int</p>\n\n<p><strong>4.0&nbsp;&nbsp; SUBMISSION</strong></p>\n\n<p>Expressions of interest must be submitted written to the following email address;</p>\n\n<p>Tenders@comesa.int with a copy to procurement@comesa.int</p>\n\n<p>ATT: THE&nbsp;HEAD&nbsp;OF&nbsp;PROCUREMENT</p>\n\n<p>ASSIGNMENT TITLE: <strong>PROCUREMENT OF AN ELECTRONIC DOCUMENT MANAGEMENT SYSTEM</strong></p>\n\n<p>REFERENCE No. ZM &ndash; COMESA &ndash; 445856-CS-LCS<strong> </strong></p>\n\n<p><strong>5.0&nbsp;&nbsp; C</strong><strong>LOSING DATE FOR SUBMISSION</strong></p>\n\n<p>The Closing date for receipt of Expression of Interest is 2nd May &nbsp;<em>2025 at</em><em> 10:00 hours Zambian time</em></p>\n\n<p>NB: Physical submission of EOIs shall not be accepted.</p>\n\n<p><strong>TERMS OF REFERENCE&nbsp;</strong></p>\n\n<ol>\n\t<li>Background</li>\n</ol>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased co-operation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>Currently, information management is manual with offices filling with files, extra storage spaces that are quickly running out, and low accountability on records management. Manual management of records has been time consuming as the retrieval mechanisms are tedious, document loss has been witnessed occasioning repeat processes, inefficiency, and delayed decisions. Duplication of information has become common as divisions are not able to establish whether the same information exists in other divisions, and this has added to the costs of managing information.</p>\n\n<p>There are no established archiving procedures, and it has become difficult to move information through the records management cycle. Furthermore, security of these records in paper formats stored in rooms that are not purpose-built, coupled with lack of security for personal data through unauthorized access, poses threat to the information. Information back-up is not guaranteed as there are no offsite storage facilities and information could be lost in the event of a disaster. It has become increasingly difficult to establish workflows and this has created inefficiencies as documents are moved physically from office to office for signatures and approval.</p>\n\n<p>Therefore, the COMESA Secretariat is planning to acquire an Electronic Document Management System to digitize the management of documents. Furthermore, the system shall assist the Secretariat to strengthen its processes with a view to ensuring that it is efficient and effective in its operations</p>\n\n<p>It is expected that An Electronic Document Management System at COMESA will resolved the following:</p>\n\n<ul>\n\t<li><strong>Processes:</strong> Manual processes should be automated to achieve effectiveness and efficiency</li>\n\t<li><strong>Accessibility:</strong> Staff should be able to access authorized documents anytime and from anywhere.</li>\n\t<li><strong>Integration:</strong> The application should be able to fully integrate with current and future relevant application systems.</li>\n\t<li><strong>Data Integrity and Security:</strong>&nbsp; Data Integrity and Security should be enhanced through proper access controls and other electronic means. The manual system does not adequately protect information assets.&nbsp;&nbsp;</li>\n\t<li><strong>Scalability:</strong> All applications/systems at COMESA should be able to accommodate new features/modules to meet the changing organization needs</li>\n\t<li>Objectives of the System</li>\n</ul>\n\n<p>The main objectives of the project are to:</p>\n\n<ul>\n\t<li>Develop and implement efficient processes for document storage and retrieval, reducing time and enhancing organizational agility.</li>\n\t<li>Identify and simplify administrative processes to streamline operations and reduce complexity</li>\n\t<li>Implement a user-friendly self-service portal to facilitate remote work, ensuring anytime, anywhere system accessibility. Stakeholders should be able to access documents and information effortlessly.</li>\n\t<li>Implement measures to improve collaboration and version control among different stakeholders and software applications.</li>\n\t<li>Enhance security protocols to ensure the confidential protection and control of documents consistently. Scope of Work</li>\n</ul>\n\n<p><strong>2. The scope of work of the project is as follows</strong>:</p>\n\n<ul>\n\t<li><strong>Design, Development, and Implementation of an EDMS: </strong>The vendor is expected to design, develop, and implement a comprehensive EDMS that meets the requirements of COMESA.</li>\n\t<li><strong>Integration: </strong>The EDMS should be configured and fully integrated with systems like the Sun Accounting System, Monitoring &amp; Evaluation System, E-Procurement system, Human Resource Management System, Document Management System and any future application systems developed by COMESA.</li>\n\t<li><strong>Migration of Data: </strong>The vendor should provide an effective and efficient data migration approach of all existing data to the configured environment. The successful vendor will be expected to provide full support to the COMESA during the data migration phases, including the identification and resolution of data quality issues.</li>\n\t<li><strong>Training &amp; Knowledge Transfer:</strong> The vendor shall provide a detailed training and change management plan to ensure proper knowledge transfer to the business users as well as the IT Administrators. The vendor shall provide specific training programme for:\n\t<ul>\n\t\t<li>Business users to continue operational responsibility for the delivered solution.</li>\n\t\t<li>IT staff to enable first line support to users and for the proper administration of the delivered solution.</li>\n\t\t<li>Business users and IT staff create and eventually customize reports/dashboards using the proposed reporting tools.</li>\n\t\t<li>Business users and IT staff perform basic administration tasks like create users, assign roles to users and de-activate users</li>\n\t\t<li>Business users adopt to operational changes that may arise due to the implementation of the new system for seamless uptake</li>\n\t</ul>\n\t</li>\n</ul>\n\n<ul>\n\t<li><strong>Documentation: </strong>The successful vendor will be required to provide a comprehensive set of documentations regarding the EDMS including system manual, installation manual and user manual.</li>\n\t<li><strong>Post implementation support: </strong>The vendor should provide a minimum of two (2) months on-site post implementation support after successful Go-Live of the system.</li>\n\t<li><strong>Warranty: </strong>The warranty period should be for a period of 12 months, effective immediately after the expiry of the on-site post implementation support period. The warranty shall cover all configurations and functions as stated in the scope of the work for corrective maintenance.</li>\n\t<li><strong>Support and Maintenance after warranty period: </strong>Vendors shall submit their support and maintenance costs related to support over the next two (2) years after the warranty period, based on an agreed Service Level Agreement (SLA) (8x5). The support shall cover among other troubleshooting/bug fixing, patch management, fine tuning and health checks. Vendor should also provide the response time to blocking/non-blocking issues as well as their rates on an hourly basis for any intervention that is not covered under SLA. COMESA reserves the right to proceed with award and renewal of the Maintenance agreement.</li>\n\t<li>Functional Requirements</li>\n</ul>\n\n<p>The EDMS solution must include, but is not limited to, the following features:</p>\n\n<ul>\n\t<li><strong>Document Storage and Organization</strong></li>\n</ul>\n\n<ul>\n\t<li>Centralized document repository with hierarchical folder structure.</li>\n\t<li>Ability to tag documents with metadata for easier categorization and searching.</li>\n\t<li>Support for various document formats, including text, images, PDFs, spreadsheets, presentations, etc</li>\n\t<li><strong>Version Control and Audit Trail</strong></li>\n\t<li>Automatic versioning of documents with clear version history.</li>\n\t<li>Ability to view and restore previous versions of documents.</li>\n\t<li>Detailed audit trail for tracking changes, modifications, and user activities.</li>\n</ul>\n\n<ul>\n\t<li><strong>Access Control and Security based on best practices and industry standards</strong></li>\n</ul>\n\n<ul>\n\t<li>Role-based access control with customizable permission levels.</li>\n\t<li>Encryption of documents both at rest and during transmission.</li>\n\t<li>Integration with existing authentication systems (LDAP, Active Directory, etc.).</li>\n\t<li>Two-factor authentication (2FA) support.</li>\n</ul>\n\n<ul>\n\t<li><strong>Search and Retrieval</strong></li>\n</ul>\n\n<ul>\n\t<li>Full-text search functionality across document content and metadata.</li>\n\t<li>Advanced search filters to refine search results.</li>\n\t<li>Quick access to recently viewed or edited documents.</li>\n</ul>\n\n<ul>\n\t<li><strong>Mobile and Remote Access:</strong></li>\n</ul>\n\n<ul>\n\t<li>Responsive web interface for access from various devices.</li>\n\t<li>Mobile apps for iOS and Android with offline access.</li>\n</ul>\n\n<ul>\n\t<li><strong>Cloud-based hosting and data backup</strong></li>\n</ul>\n\n<p>The system shall be hosted on the COMESA servers and shall be able to operate in a cloud based environment.</p>\n\n<ul>\n\t<li><strong>Scanning </strong></li>\n</ul>\n\n<p>A scanning feature is desirable, and the system solution should be compatible with a wide variety of scanners.</p>\n\n<ul>\n\t<li><strong>Collaborative and Workflow </strong></li>\n</ul>\n\n<p>The EDMS shall provide facilities to automate workflow processes and actions that documents go through from creation to storage, review &amp; collaboration, approval, publishing and archiving to streamline processes. The EDMS should automatically generate mails to convey the assigner and assignee of an assignment operation.</p>\n\n<ul>\n\t<li><strong>Artificial Intelligence </strong></li>\n</ul>\n\n<p>The EDMS can include Artificial Intelligence (AI) features to greatly enhance the capabilities of the system by automating tasks, improving search and retrieval, enhancing collaboration, and providing insights.</p>\n\n<ul>\n\t<li><strong>Integration and API </strong></li>\n</ul>\n\n<ul>\n\t<li>API access for integration with other systems and custom applications like Sun accounting system, Planning and Budgeting System, Monitoring and Evaluation System, E-Signature solution, E-Procurement and HR System.</li>\n\t<li>Compatibility with common file formats and third-party applications</li>\n</ul>\n\n<ul>\n\t<li><strong>Analytics and Reports </strong></li>\n</ul>\n\n<p>The EDMS shall provide built-in analytics and reporting features with data extraction in various formats such as MS Word, PDF or MS Excel and includes drilling capabilities. It should include interactive dashboards and highly formatted reporting.</p>\n\n<p>The objective of the report module is to facilitate decision-making by the Executive Management.</p>\n\n<ol>\n\t<li>Non-functional Requirements</li>\n</ol>\n\n<p>The non-functional requirements for the EDMS are as follows:</p>\n\n<ul>\n\t<li><strong>User interface </strong></li>\n</ul>\n\n<p>The user interface is key to application usability. The System should include content presentation, application navigation, and user assistance.</p>\n\n<ul>\n\t<li><strong>Role-based User Groups</strong></li>\n</ul>\n\n<p>The system must provide users with screens focusing on their roles (minimizing clutter).</p>\n\n<ul>\n\t<li><strong>Dynamic content presentation</strong></li>\n</ul>\n\n<p>Users should be provided with in data presentation. The system should allow users to select appropriate settings and property values on display options that fits their preferences, e.g., choice of whether data appears in a grid, a chart, or a grid/chart combination.</p>\n\n<ul>\n\t<li><strong>User assistance</strong></li>\n</ul>\n\n<p>The system should provide online help that includes comprehensive instructions on using each feature. The users should be provided with default mechanisms for accessing help pages e.g., by clicking the question mark icon across all the screens or a distinct menu Help &gt; Help... menu option in the menu bar. A link to a comprehensive help resource should be provided in various formats e.g., Wiki, PDF etc.</p>\n\n<ul>\n\t<li><strong>User navigation</strong></li>\n</ul>\n\n<p>The system should provide a simple traceable navigation of the entire system with options clearly showing the users where they are and how they can navigate away from the current screens and consequences of doing so.</p>\n\n<ul>\n\t<li><strong>Hardware Requirements</strong></li>\n</ul>\n\n<p>The vendor shall provide the hardware sizing for the proper running of the application.</p>\n\n<ul>\n\t<li><strong>Hardware interface requirements</strong></li>\n</ul>\n\n<p>All server-side components must execute on server-class computers. All client-side components must execute on workstation-class and personal-class computers.</p>\n\n<ul>\n\t<li><strong>Communication interface requirements</strong></li>\n</ul>\n\n<ul>\n\t<li><strong>Web browser:</strong> The system must provide an option to be accessed via the internet using the latest browsers e.g., Chrome, Edge, Mozilla, Safari with backward compatibility support to two versions.</li>\n</ul>\n\n<p>Note: in a scenario where the system uses third party plugins to run, this must be stated in advance for information security tests and clearance.</p>\n\n<ul>\n\t<li><strong>Communication standards and Network server communications protocols: </strong>All communications between the server components and user interactions must be encrypted to safeguard user and data privacy. Only secure protocols shall be permitted e.g., HTTPS, FTPS with appropriate authentication and authorization mechanisms.</li>\n\t<li><strong>Data transfer rates: </strong>The system must provide appropriate data transfer rates that shall be agreed upon meeting performance requirements.</li>\n\t<li><strong>E-mail: </strong>the system must provide communication mechanisms with various stakeholders or user groups within the system. This can be achieved via forms that create support tickets or defined emails on the COMESA (comesa.int) domain.</li>\n</ul>\n\n<ul>\n\t<li><strong>Communication security or encryption</strong></li>\n</ul>\n\n<p>End to end encryption must be provided in all the interactions in the system e.g., chat facilities, web browsers, mobile apps etc.</p>\n\n<ul>\n\t<li><strong>Performance</strong></li>\n</ul>\n\n<p>The system should be responsive and perform efficiently, even with many users and data. It should have acceptable response times for tasks such as document retrieval, report generation, and system updates. The vendor will perform a stress test once the system is commissioned.</p>\n\n<ul>\n\t<li><strong>Availability</strong></li>\n</ul>\n\n<p>The system should be designed to minimize downtime through robust error handling, fault tolerance, and backup and recovery mechanisms. It should also have appropriate monitoring and alerting capabilities to identify and address potential issues proactively.</p>\n\n<ul>\n\t<li><strong>Recoverability</strong></li>\n</ul>\n\n<p>The system should be designed to recover quickly from a crash or a failure in the system and return to full operations.</p>\n\n<ul>\n\t<li><strong>Security</strong></li>\n</ul>\n\n<p>The system shall provide security measures based on best practices and international standards. Some security features may include encryption of data on database and web services, implementation using HTTPS, only authorized users are able to access the system via an authentication mechanism and Role based access.</p>\n\n<ul>\n\t<li><strong>Interoperability</strong></li>\n</ul>\n\n<p>All system components must follow a common and standard set of exchange formats to exchange data.</p>\n\n<ul>\n\t<li><strong>Scalability </strong></li>\n</ul>\n\n<p>The design should be scalable to provide for future business needs.</p>\n\n<ul>\n\t<li><strong>Seamless Integration</strong></li>\n</ul>\n\n<p>The system should also be able to integrate with other systems such as Sun Financial system, M&amp; E system, Human Resource Management System, E-Procurement system, Planning &amp; Budgeting system, etc. It should provide standardized interfaces (APIs) or support industry-standard integration protocols to facilitate data exchange and interoperability.</p>\n\n<ul>\n\t<li><strong>Compliance</strong></li>\n</ul>\n\n<p>The system should adhere to relevant legal and regulatory requirements, such as data protection and privacy regulations (e.g., GDPR) and employment law. It should support features and controls to ensure compliance, such as data retention policies, audit trails, and consent management. It is recommend that the design of the Document Management System comply with the principles laid down in the ISO international standard IEC 82045-1.</p>\n\n<ul>\n\t<li><strong>&nbsp;Mobile Compatibility </strong></li>\n</ul>\n\n<p>The system should be accessible and functional on mobile devices, allowing users to perform essential tasks on smartphones or tablets. The user interface should be responsive and optimized for mobile screens, enabling employees and managers to access information on the go.</p>\n\n<ul>\n\t<li><strong>Technology </strong></li>\n</ul>\n\n<p>The system shall be developed/customize on the latest version of technology stack. The vendor shall provide the system architecture, infrastructure and license requirements for the proposed solution.</p>\n\n<ol>\n\t<li>Project Team</li>\n</ol>\n\n<p>A project committee will be setup to provide governance, oversight, and strategic guidance for the project. The committee serves as a central decision-making body, ensuring that the project aligns with the overall goals and objectives of the organization. The project committee will comprise of the following members:</p>\n\n<ul>\n\t<li>Director &ndash; Human Resource and Administration</li>\n\t<li>Director - Information Communications Technology (ICT)</li>\n\t<li>Director - Budget and Finance</li>\n\t<li>Chief- Conference Services</li>\n\t<li>Head- Information and Research Centre</li>\n\t<li>Project Manager</li>\n\t<li>Finance Officer</li>\n\t<li>Organisational Development Expert</li>\n\t<li>Functional Leads (EDMS)</li>\n\t<li>EDMS Implementation Consultants</li>\n\t<li>End-users representatives from various departments</li>\n</ul>\n\n<p><strong>Timeline</strong></p>\n\n<p>The EDMS implementation project is anticipated to span for 10 months after the vendor selection and contract negotiation, which will cover a period of 3 months. The actual Project implementation timelines are as follows:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d0cece; width:31.5pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0cece; width:223.8pt\">\n\t\t\t<p><strong>Activity</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0cece; width:149.7pt\">\n\t\t\t<p><strong>Timeline</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Planning and requirements gathering</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/06/2024 to 15/07/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>System customization and configuration</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>16/07/2024 to 31/10/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Data migration and testing</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/11/2024 to 13/12/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Training and user acceptance testing</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>13/01/2025 to 28/02/2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Rollout and post-implementation support</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/03/2025 to 30/04/2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Implementation Plan</strong></p>\n\n<p>The vendor shall provide a project Grant charts detailing the project schedule, phase, task and subtask duration, proposed phasing for roll-out of proposed system and highlight key milestone dates that illustrates the duration of tasks listed in the scope of work and identifies results and deliverable milestone. The proposed Grant chart should be based upon the proposed project approach and timeline.</p>\n\n<p>Project Approach, Methodology &amp; Governance</p>\n\n<p>The vendor is expected to describe how the firm intends to manage all aspects of the work to be performed, including schedules for completion of tasks/subtasks, procedures for scheduling and cost control.</p>\n\n<p><strong>Testing and UAT</strong></p>\n\n<p>The vendor should commit to submit Unit Test Plans, System Test Plans, Integration Test Plans, Load and Stress Test Plan. The Test Results should be submitted to COMESA as evidence of full-fledged testing carried out prior to UAT.</p>\n\n<p>The vendor should submit UAT test scripts to ensure that the UAT scenarios cater for all the requirements expressed by the users. A comprehensive user manual should be made available before the training.</p>\n\n<p>The UAT exercise should consist of different rounds of testing as follows:</p>\n\n<ol>\n\t<li>Round 1 should consist of executing all the test scenarios business flow wise and identify list of issues if any by the user,</li>\n\t<li>Vendor should commit to ensure that issues identified in Round 1 are fully addressed to the satisfaction of the users prior to starting the next round (Round 2),</li>\n\t<li>Vendor should also commit to producing evidence that that non-regression testing has been performed prior to starting next round, and</li>\n\t<li>Subsequent rounds are conducted until no further issues are identified.</li>\n</ol>\n\n<p>&nbsp;<strong>Quality Assurance Plan</strong></p>\n\n<p>The vendor shall provide a proper Quality Assurance plan to ensure the success of project.&nbsp; The vendor should ensure that all work products are evaluated and that evidence is provided to the fact that:</p>\n\n<ol>\n\t<li>It conforms to specified requirements, and</li>\n\t<li>It has been produced according to the project standards and processes.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; <strong>&nbsp;Change Management</strong></li>\n</ol>\n\n<p>Change management strategies will be employed to ensure smooth transition and adoption of the new Planning &amp; Budgeting system. As the implementation and adoption of business process changes will be vital to the success of the project, the consultant should be able to explain and communicate business process changes and their associated requirements to individuals throughout the COMESA including to executive managers, division heads, subject matter experts, and end-users. The consultant shall provide guidance and mentor the project core team to successfully implement the overall business transformation and system changes for the COMESA. The change management plan will include amongst others:</p>\n\n<ul>\n\t<li>Communication plan (regular updates, town hall meetings, FAQ),</li>\n\t<li>Change impact assessment and Resistance management,</li>\n\t<li>Training and Development plan for staffs affected by the change,</li>\n\t<li>Feedback mechanisms, and</li>\n\t<li>Contingency plan.</li>\n</ul>\n\n<ol>\n\t<li>Project Deliverables</li>\n</ol>\n\n<p>The following mandatory deliverables should be provided:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p><strong>Details</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Project Management Plan and Project Documents</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The project management plan shall cover the following aspects:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Project approach and organization</li>\n\t\t\t\t<li>Requirement Management</li>\n\t\t\t\t<li>Scope Management</li>\n\t\t\t\t<li>Schedule Management</li>\n\t\t\t\t<li>Deliverable Plan</li>\n\t\t\t\t<li>Configuration management</li>\n\t\t\t\t<li>Quality Management</li>\n\t\t\t\t<li>Risk Management</li>\n\t\t\t\t<li>Change management, communication, and training plan</li>\n\t\t\t\t<li>Go-Live Plan</li>\n\t\t\t\t<li>Warranty service plan</li>\n\t\t\t</ol>\n\n\t\t\t<p>The vendor shall update the project plan at the end of each project phases. Furthermore, the vendor is expected to provide regular weekly progress reports or as specified by COMESA project steering committee.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>2.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The solution blueprint shall cover all the functional, technical, migration and security requirements as well as the system architecture of the proposed solution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Training</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Training for business users as well as Administration training for IT department and IT Auditor. A comprehensive user manuals and Administrator manual for each module configured shall be delivered.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>User Acceptance Test Document</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Vendor should submit the UAT test scripts and ensure that all the UAT scenarios are catered for the requirements expressed by the users. The UAT exercise should consist of different rounds of testing. The vendor should ensure that a full-fledged testing has been carried out prior to UAT.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>5.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>A fully operational and bug free efficient system as per requirement</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide a fully operational and bug free system prior to Go-Live. The following will have to be addressed to the satisfaction of the users prior to Go-Live of the system:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>All requirements of the users (including IT Security requirements) have been catered for in the Application Software.</li>\n\t\t\t\t<li>All identified scenarios are fully and comprehensively tested during each round of UAT.</li>\n\t\t\t\t<li>All bugs identified during UAT have been dealt with.</li>\n\t\t\t\t<li>Trainings on System Administration and Application Software have been delivered.</li>\n\t\t\t\t<li>All documentations are provided</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Commissioning report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The commissioning report shall include among others:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>The level of customization for the EDMS</li>\n\t\t\t\t<li>System setup document</li>\n\t\t\t\t<li>Security Policies</li>\n\t\t\t</ol>\n\n\t\t\t<p>The sign-off shall be done at the end of the operational acceptance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Warranty Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide all the terms and condition of the warranty.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>7.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Support Agreement</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide all the terms and condition of the support. Furthermore, the vendor should provide a monthly progress report on maintenance &amp; support activities and a periodic SLA performance report.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Training, Knowledge transfer and Support</strong></p>\n\n<p>Comprehensive training will be provided to end-users and administrators to ensure proper knowledge transfer and proficiency in using the EDMS. The training programme shall be designed for:</p>\n\n<ul>\n\t<li>Business users to continue operational responsibility for the delivered solution,</li>\n\t<li>IT staff to enable first line support to users and for the proper administration of the delivered solution,</li>\n\t<li>Business users and IT staff create and eventually customize reports/dashboards using the proposed reporting tools, and</li>\n\t<li>Business users and IT staff perform basic administration tasks like create users, assign roles to users and de-activate users.</li>\n\t<li>Business users adopt to operational changes that may arise due to the implementation of the new system for seamless uptake</li>\n</ul>\n\n<p>A minimum of three (3) months on-site post implementation support will be provided. Additionally, the selected consultant shall provide ongoing support will be available through:</p>\n\n<ul>\n\t<li>Helpdesk support,</li>\n\t<li>Online resources (knowledge base, FAQs),and</li>\n\t<li>Periodic refresher training sessions. &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Evaluation and Monitoring</strong></li>\n</ul>\n\n<p>The success of the EDMS implementation project will be evaluated based on predefined success criteria, including:</p>\n\n<ul>\n\t<li>Achievement of project milestones and deliverables within the established timeline and budget,</li>\n\t<li>User satisfaction with the system functionality and usability,</li>\n\t<li>Improvement in process efficiency and accuracy,</li>\n\t<li>Seamless integration with other systems (Sun Finance System, Planning &amp; Budging system, E-Procurement, M&amp;E system, HRMS), and</li>\n\t<li>Reduction in manual tasks and administrative overhead.</li>\n</ul>\n\n<p>The project committee through regular project status meetings and reports will monitor progress.</p>\n\n<ol>\n\t<li>Other Requirements</li>\n</ol>\n\n<ol>\n\t<li>The vendor is required to sign a Non-Disclosure Agreement (NDA).</li>\n\t<li>The system should support multilingual.</li>\n\t<li>The EDMS shall be using the latest and most up-to-date technologies and frameworks.</li>\n\t<li>The security features of the system shall meet industry standards and best practices.</li>\n</ol>\n\n<p><strong>Payment Terms</strong></p>\n\n<p>The structure of payment shall be as follows:</p>\n\n<p>Implementation Services</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>S.N</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Deliverable</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>Payment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Project Implementation Plan with agreed project implementation plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>EDMS based on the Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Go-live</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Retention Money- 12 months after Go-Live</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>Support Services</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>S.N</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>Deliverable</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>Payment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>12 Months post go-live Warranty</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>0%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>Annual Maintenance Contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>Annually</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Company Profile and Profile of Consultants</strong></p>\n\n<p>A company profile of the Vendor as well as a list of staff that would be involved in the project and their respective qualifications and experience should be provided.</p>\n\n<p>The Consultant shall determine the number and nature of experts they will require to achieve the objectives of the assignment, in accordance with their proposed approach and methodology. Nonetheless, the Consultant&rsquo;s team shall be composed of at least four (4) experts with extensive demonstrable experience/knowledge as follows:</p>\n\n<ol>\n\t<li><strong>Project Manager</strong></li>\n</ol>\n\n<p><strong>&nbsp; &nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:126.15pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:341.35pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:126.15pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>Master&rsquo;s degree in Computer Science, business administration, project management or related discipline, or 5 years relevant professional experience in project management.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Professional certification in project/programme management. (Desirable)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:341.35pt\">\n\t\t\t<p>A minimum of &nbsp;5 years&rsquo; experience in managing IT projects preferably with a focus on EDMS implementations, specifically within the African region.</p>\n\n\t\t\t<p>Professional certifications in EDMS or Change Management are desirable. Strong communication, leadership, and problem-solving skills are essential for effective project execution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Solution Architect</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.75pt\">\n\t\t\t<p><strong>ducation</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.75pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.75pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.75pt\">\n\t\t\t<p>A minimum of 5 years of experience in solution architecture, with a focus on EDMS implementations.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Relevant certifications in solution architecture, enterprise architecture, or EDMS technologies (e.g., TOGAF, AWS Certified Solutions Architect, EDMS platform-specific certifications) is desirable.</p>\n\n\t\t\t<p>Strong communication, leadership, and problem-solving skills are essential for effective project execution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Functional Expert</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.65pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.85pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.65pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.85pt\">\n\t\t\t<p>A minimum of 5 years of hands-on experience working with EDMS functionalities and implementation.</p>\n\n\t\t\t<p>Proficiency in EDMS platforms and related technologies, with specific expertise in implementation, customization, and maintenance.</p>\n\n\t\t\t<p>In-depth knowledge of EDMS platforms.</p>\n\n\t\t\t<p>Proficiency in mapping processes and aligning them with IT system capabilities to optimize workflows.</p>\n\n\t\t\t<p>Proven ability to gather and document detailed requirements from EDMS and other stakeholders for EDMS configurations and customizations.</p>\n\n\t\t\t<p>Hands-on experience in configuring and customizing EDMS to meet organizational needs.</p>\n\n\t\t\t<p>Experience in conducting comprehensive testing of EDMS solutions to ensure functionality, accuracy, and compliance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Technical Expert</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.8pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.7pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.8pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.7pt\">\n\t\t\t<p>A minimum of 5 years of hands-on experience working with EDMS technologies.</p>\n\n\t\t\t<p>Proficiency in EDMS platforms and related technologies, with specific expertise in implementation, customization, and maintenance.</p>\n\n\t\t\t<p>Hands-on experience with EDMS.</p>\n\n\t\t\t<p>Strong programming skills in languages relevant to EDMS customization (e.g., Java, Python, SQL).</p>\n\n\t\t\t<p>Proficiency in scripting languages for automation and integration purposes.</p>\n\n\t\t\t<p>Expertise in database management systems, particularly those used in EDMS (e.g., MySQL, Oracle, SQL Server)</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>A Project Team Composition Template clearly indicating the manpower input months should be provided as per format in Annex 1.</p>\n\n<p>In this respect, Vendors are required to submit information on reference sites and staff profiles as per format at Annex 2.</p>\n\n<p>COMESA shall be notified in writing of any change or replacement of staff being assigned on the project as per their response of the bidding document. Respective qualifications and experience of any new staff joining the implementation team should be provided. COMESA reserves the right to approve any such change.</p>\n\n<p><strong>Customer References</strong></p>\n\n<p>To be eligible for this exercise, vendors should have at least three (3) reference sites where they have successfully implemented a similar project.</p>\n\n<p><strong>Annexes</strong></p>\n\n<p>Annex 1: Project Team Composition Template</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:28.1pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:127.7pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.65pt; vertical-align:top; width:233.8pt\">\n\t\t\t<p><strong>Manpower Input in Months</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Remote</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>On-Site</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Project Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Jane Doe</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>0</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Annex 2: Individual Team Profiles&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"width:493.3pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#0070c0; height:21.95pt; width:493.3pt\">\n\t\t\t<p><strong>Curriculum Vitae: Expert 1</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Role in the Project</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Role X</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Expert 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Date of Birth</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Dd/mm/yyyy</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Nationality</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>XXXX</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Degree</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>College</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Year</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Bachelor of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2002</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Master of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2010</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Professional Certifications</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Certification </strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>Body and Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Status</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Active</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Expired</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Expert Profile Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Work Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>No</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p><strong>Employer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p><strong>From</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>To</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Experience Related to Current Assignment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Project Client</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Client Name</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Responsibilities in the project</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Technologies Used</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Technology 1, Technology 2, Technology N</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>Sign</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:202.6pt\">\n\t\t\t<p>Expert Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>Date</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>00/00/00</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>"},{"id":"OP00340207","notice_type":"Invitation for Bids","noticedate":"18-Feb-2025","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2025-02-28T00:00:00Z","submission_deadline_time":"14:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P180171","project_name":"Regional Climate Resilience Program for Eastern and Southern Africa 1 Project (RCRP1)","bid_reference_no":"SS-MWRI-460008-GO-RFQ","bid_description":"Procurement of Desktop Computer, Laptop Computer, Video Camera, Software and Accessories for the SKMS-RCRP","procurement_group":"GO","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","contact_address":"Juba, South Sudan","contact_ctry_name":"South Sudan","contact_email":"asyunda@gmail.com","contact_name":"Andrew Yunda","contact_organization":"Ministry of Water Resources and Irrigations","contact_phone_no":"0912615175","submission_date":"2025-02-18T00:00:00Z","notice_text":"<p><strong><strong>1</strong></strong><strong><strong>8</strong></strong><strong><strong>th</strong></strong><strong><strong>&nbsp;February,</strong></strong><strong><strong>&nbsp;20</strong></strong><strong><strong>25</strong></strong></p>\n\n<p><strong><strong>ALL INVITED SUPPLIERS</strong></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong><em><em>R</em></em></strong><strong><em><em>ef </em></em></strong><strong><em><em>No: SS-MWRI-460008-GO-RFQ </em></em></strong></p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Government of South Sudan through the Ministry of Water Resources and Irrigation (MWRI) is implementing the Regional Climate Resilience Program for Eastern and Southern Africa Project (RCRP Project).</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Ministry of Water Resources and Irrigation (MWRI) has received funding from the World Bank and it intends to apply part of the proceeds to pay for Supply&nbsp;Communication tools to facilitate the Senior Communication and Knowledge Management Specialist conduct assignments for the RCRP as per the schedule of requirement in section A.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Ministry now invites qualified suppliers to submit quotations to <strong><strong>Supply </strong></strong><strong><strong>Communication Tools for the Senior Communication &amp; Knowledge Management Specialist for Communication Needs at the Project.</strong></strong>&nbsp;More details are provided in the Technical Data (Section D).</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>A firm will be selected under the Request for Quotations procedures and in a format as described in this RFQ, in accordance with the policies of the World Bank&rsquo;s Procurement Regulations for IPF Borrowers: Procurement in Investment Financing - Goods, Works, Non-Consulting and Consulting Services dated July 2016 and current edition September 2023. (&ldquo;Procurement Regulations&rdquo;), which can be found at the following website: <u><u>https://thedocs.worldbank.org/en/doc/6c0602876d68949e80820507d90a14ed-0290012023/procurement-regulations-september-2023</u></u>&nbsp;</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Section A: Quotation Requirements </strong></p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Brief description of the services required are listed below.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:427.7500pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#00b0f0; width:33.4000pt\">\n\t\t\t<p><strong>No</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:290.8500pt\">\n\t\t\t<p><strong>Item Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:45.0000pt\">\n\t\t\t<p><strong>Unit </strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:58.5000pt\">\n\t\t\t<p><strong>Quantity</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"7\" style=\"height:27.6000pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.6000pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<p><strong><u><strong><u>Communication Tools</u></strong></u></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.6000pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.6000pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:28.3000pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>High-performance Desktop Computer.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.3000pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.3000pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:22.1500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>High-performance Laptop Computer.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.1500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:22.1500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:27.1000pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Virtual Reality Headsets.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.1000pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:27.1000pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:23.0000pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Microphones</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:23.0000pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:23.0000pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.8000pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Audio Recorders</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.8000pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.8000pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Adobe Audition Collections</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Video Conferencing Systems/ Webinar Platforms</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Speakers</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Portable Hard Drives</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Memory Cards</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Servers</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>External Hard Drives</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Uninterruptible Power Supplies (UPS)</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Microsoft Office 365</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>05</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Knowledge Management Software</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:33.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:290.8500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Antivirus Software</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:45.0000pt\">\n\t\t\t<p>Sets</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:16.5500pt; vertical-align:top; width:58.5000pt\">\n\t\t\t<p>05</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Quotations:</strong>&nbsp;Bidders must quote for all the required items in the package. Partial quotations will be rejected. Quotations shall cover all costs of labour, materials, overheads, profits and all associated costs for performing the supply. The cost of performing the supply&nbsp;shall be included in the items stated and the cost of any incidental supply&nbsp;or materials shall be deemed to be included in the prices quoted.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Quotation must be in US Dollars.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Validity:</strong>&nbsp;Quotations must be valid for 30 days from the date of submission of quotations given below.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Warranty period shall be Six&nbsp;(6) Months from the date of acceptance of the Goods. Any defects must be rectified within two&nbsp;(2)&nbsp;weeks.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Payment Terms:</strong>&nbsp;Payments will be made in the following manner:</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Submission of Invoice upon delivery and confirmation of the communication tools&nbsp;by the Senior Communication and Knowledge Management&nbsp;Specialist.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Full Payment<strong>&nbsp;</strong>shall be made into the Supplier&rsquo;s Bank Account in the currency of the quotation within 14 days on completion of satisfactory performance of the purchase order and upon receipt of an invoice supported by a Delivery Note.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Quotations (<strong>c</strong><strong>learly marked with the quotation number and description and no other markings</strong>) must be delivered to the address above by hard copy on or before <strong><strong>Friday</strong></strong><strong><strong>, 2</strong></strong><strong><strong>8</strong></strong><strong><strong>th</strong></strong><strong><strong>&nbsp;February,</strong></strong><strong><strong>&nbsp;202</strong></strong><strong><strong>5</strong></strong><strong><strong>&nbsp;at 02:00 PM local Time</strong></strong>.&nbsp;Late bids shall be rejected.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Your quotation in the <strong>attached format</strong>&nbsp;should be sealed in an envelope and addressed to and delivered at the following address:</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>NB. Full Quotations can be downloaded from NGO forum from the Tender section (<u><u>Latest Tenders &amp; Other Advertisments topics - South Sudan NGO Forum - Communication Portal</u></u>&nbsp;) or at the Ministry of Water Resources from the Project Coordinator office at the below address.&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>The Project Coordinator (RCRP)</strong></p>\n\n<p><strong>Project Implementation Unit</strong></p>\n\n<p><strong>Ministry of Water Resources and Irrigation (MWRI) </strong></p>\n\n<p><strong><strong>Plot No: 11, Block No: AXII, Hai Cinema, </strong></strong></p>\n\n<p><strong><strong>Juba, South Sudan</strong></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Section B</strong><strong>: </strong><strong>Quotation Submission Sheet</strong></p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>Currency of Quotation: <strong>US Dollars</strong>&nbsp;&nbsp;</li>\n\t<li>Delivery period offered: &hellip;&hellip;&hellip;&hellip; days from date of contract signature</li>\n\t<li>The validity period of this Quotation is: &hellip;&hellip; days from the date for receipt of Quotations.</li>\n\t<li>Warranty and or license period (where applicable): &hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.. Months.</li>\n\t<li>We attach the following documents:</li>\n</ol>\n\n<ol>\n\t<li><strong><strong>Section C of the Request for Quotations completed and signed;</strong></strong></li>\n\t<li><strong><strong>A copy of valid Business Registration Certificate from bidder&rsquo;s country of origin,</strong></strong></li>\n\t<li><strong><strong>A copy of a valid Tax Certificate or Tax Identification Number from bidders country of origin</strong></strong></li>\n\t<li><strong><strong>A list of two recent contracts of similar nature supplied and of comparable value, </strong></strong></li>\n\t<li><strong><strong>Warranty period.</strong></strong></li>\n</ol>\n\n<ol>\n\t<li>We confirm that our quotation is based on the terms and conditions stated in your Request for Quotations referenced above, and that any resulting contract will be subject to the draft Contract attached.</li>\n\t<li>We confirm that the prices quoted are fixed and firm for the duration of the validity period and will not be subject to revision or variation.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p><strong>Authorized</strong><strong>&nbsp;By:</strong></p>\n\n<table cellspacing=\"0\" style=\"width:464.4500pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:55.0500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:219.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:55.0500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Position:</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:219.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>..........................................................</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:274.7500pt\">\n\t\t\t<p>Authorized for and on behalf of:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:55.0500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Vendor:</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:409.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;..</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Address: &hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.</p>\n\n<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;........</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Section C:</strong><strong>&nbsp;</strong><strong>Schedule of Requirements</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>(to be priced by Bidder)</strong></p>\n\n<p><strong><em>&nbsp;</em></strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:503.2500pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#005878; width:35.5000pt\">\n\t\t\t<p><strong>Item No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#005878; width:255.1500pt\">\n\t\t\t<p><strong>Description of Goods</strong><br />\n\t\t\t(Attach detailed specification if necessary)</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#005878; width:49.6000pt\">\n\t\t\t<p><strong>Unit</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#005878; width:35.4500pt\">\n\t\t\t<p><strong>Qty</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#005878; width:56.7000pt\">\n\t\t\t<p><strong>Delivered Unit Price CIP Juba</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#005878; width:70.8500pt\">\n\t\t\t<p><strong>Delivered Total Price CIP Juba</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>High-performance Desktop Computer.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>High-performance Laptop Computer.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Virtual Reality Headsets.</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Microphones</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Audio Recorders</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Adobe Audition Collections</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Video Conferencing Systems/ Webinar Platforms</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Speakers</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Portable Hard Drives</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Memory Cards</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>02</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Servers</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>External Hard Drives</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Uninterruptible Power Supplies (UPS)</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Pieces</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>14</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Microsoft Office 365</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>05</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Knowledge Management Software</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Set</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>01</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:255.1500pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Antivirus Software</strong></strong></li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.6000pt\">\n\t\t\t<p>Sets</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:35.4500pt\">\n\t\t\t<p>05</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:56.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:35.5000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"4\" style=\"vertical-align:top; width:396.9000pt\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:70.8500pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>Notes: </strong></p>\n\n<p><strong><em><strong>Attach any documents -brochure, technical data, etc that may provide additional description of goods required</strong></em></strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Authorized</strong><strong>&nbsp;By:</strong></p>\n\n<table cellspacing=\"0\" style=\"width:480.3500pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:70.9500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:219.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:70.9500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Position:</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:219.7000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>..........................................................</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:32.8000pt; vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:290.6500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Authorized&nbsp;for and on behalf of:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:63.8000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.9000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:70.9500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Vendor:</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:409.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;&hellip;..</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Section D</strong><strong>: </strong><strong>&nbsp;TECHNICAL DATA/SPECIFICATIONS</strong><strong><u>&nbsp;</u></strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:524.5500pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#00b0f0; width:28.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:125.4500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:200.6000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>required minimum specification</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p><strong>bidder&rsquo;s offered detailed specification</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#00b0f0; width:28.4000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#00b0f0; width:125.4500pt\">\n\t\t\t<p><strong>Genral</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#00b0f0; width:370.7000pt\">\n\t\t\t<p><strong><strong>The supplier should quote to supply the most current model in its production line. All specifications are minimum, except where ranges, approximations and exactitudes are stated.</strong></strong><br />\n\t\t\t<strong><strong>Bidders should provide brand, make, model and serial number for goods quoted for.</strong></strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>High-performance Desktop Computer.</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Processor (CPU)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>M2 Max</strong></strong>: 12-core CPU, 30-core GPU, 16-core Neural Engine (up to 96 GB RAM)</li>\n\t\t\t\t\t<li><strong><strong>M2 Ultra</strong></strong>: 24-core CPU, 60-core GPU, 32-core Neural Engine (up to 192 GB RAM)</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>RAM</strong></strong>: 32GB (standard), configurable up to 192GB (for M2 Ultra variant)</li>\n\t\t\t\t<li><strong><strong>Storage</strong></strong>: 512GB SSD (base) with options up to 8TB SSD</li>\n\t\t\t\t<li><strong><strong>Graphics (GPU)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>M2 Max: 30-core GPU or 38-core GPU (depending on the configuration)</li>\n\t\t\t\t\t<li>M2 Ultra: 60-core GPU or 76-core GPU (depending on configuration)</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Ports</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>4 x Thunderbolt 4</li>\n\t\t\t\t\t<li>2 x USB-A</li>\n\t\t\t\t\t<li>1 x HDMI 2.1</li>\n\t\t\t\t\t<li>1 x 10Gb Ethernet</li>\n\t\t\t\t\t<li>SDXC card slot</li>\n\t\t\t\t\t<li>1 x headphone jack</li>\n\t\t\t\t\t<li>Wi-Fi 6E &amp; Bluetooth 5.3</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>High-performance Laptop Computer.</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Processor (CPU)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>M2 Pro</strong></strong>: 10-core CPU (8 performance cores + 2 efficiency cores)</li>\n\t\t\t\t\t<li><strong><strong>M2 Max</strong></strong>: 12-core CPU (8 performance cores + 4 efficiency cores)</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Graphics (GPU)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>M2 Pro</strong></strong>: 16-core GPU (up to 19-core GPU on M2 Max)</li>\n\t\t\t\t\t<li><strong><strong>M2 Max</strong></strong>: 30-core GPU or 38-core GPU (depending on configuration)</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>RAM</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>M2 Pro</strong></strong>: 16GB (base), configurable up to 32GB</li>\n\t\t\t\t\t<li><strong><strong>M2 Max</strong></strong>: 32GB (base), configurable up to 96GB</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Storage</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>512GB SSD (base model), configurable up to 8TB</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Display</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>14.2-inch Liquid Retina XDR</strong></strong>&nbsp;display</li>\n\t\t\t\t\t<li>3024 x 1964 resolution, ProMotion (120Hz)</li>\n\t\t\t\t\t<li>Supports 1 billion colors, P3 wide color gamut</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Ports</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>3 x Thunderbolt 4</li>\n\t\t\t\t\t<li>1 x HDMI 2.1</li>\n\t\t\t\t\t<li>1 x SDXC card slot</li>\n\t\t\t\t\t<li>1 x MagSafe 3 charging port</li>\n\t\t\t\t\t<li>1 x headphone jack (supports high-impedance headphones)</li>\n\t\t\t\t\t<li>Wi-Fi 6E, Bluetooth 5.3</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Virtual Reality Headsets.</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Display</strong></strong>: 2064 x 2208 pixels per eye, LCD, 120Hz refresh rate</li>\n\t\t\t\t<li><strong><strong>Processor</strong></strong>: Qualcomm Snapdragon XR2 Gen 2 chip</li>\n\t\t\t\t<li><strong><strong>Storage Options</strong></strong>: 128GB or 512GB</li>\n\t\t\t\t<li><strong><strong>Tracking</strong></strong>: Inside-out tracking (no external sensors needed)</li>\n\t\t\t\t<li><strong><strong>Field of View (FoV)</strong></strong>: 110 degrees</li>\n\t\t\t\t<li><strong><strong>Weight</strong></strong>: 515g</li>\n\t\t\t\t<li><strong><strong>Battery Life</strong></strong>: 2-3 hours depending on usage</li>\n\t\t\t\t<li><strong><strong>Key Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Standalone VR (no PC or console required)</li>\n\t\t\t\t\t<li>Full color passthrough for mixed reality experiences</li>\n\t\t\t\t\t<li>Hand tracking support</li>\n\t\t\t\t\t<li>Rich library of games and applications on the Meta Store</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Microphones</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Type</strong></strong>: Dynamic, cardioid</li>\n\t\t\t\t<li><strong><strong>Frequency Response</strong></strong>: 50 Hz - 20 kHz</li>\n\t\t\t\t<li><strong><strong>Impedance</strong></strong>: 150 ohms</li>\n\t\t\t\t<li><strong><strong>Connectivity</strong></strong>: XLR</li>\n\t\t\t\t<li><strong><strong>Other Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Flat, wide-range frequency response ideal for vocals</li>\n\t\t\t\t\t<li>Excellent noise isolation due to its cardioid pattern</li>\n\t\t\t\t\t<li>Built-in air suspension system that reduces mechanical noise</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Audio Recorders</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Inputs</strong></strong>: 4 XLR/TRS inputs (expandable to 6 with an additional capsule)</li>\n\t\t\t\t<li><strong><strong>Frequency Response</strong></strong>: 20 Hz - 20 kHz</li>\n\t\t\t\t<li><strong><strong>Recording Media</strong></strong>: SD/SDHC/SDXC card</li>\n\t\t\t\t<li><strong><strong>Other Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>6-track simultaneous recording capability</li>\n\t\t\t\t\t<li>Interchangeable input capsules (XY, shotgun, etc.)</li>\n\t\t\t\t\t<li>Built-in stereo microphones (XY configuration)</li>\n\t\t\t\t\t<li>Large LCD touchscreen for easy control</li>\n\t\t\t\t\t<li>Adjustable gain and high-quality preamps</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Adobe Audition Collections</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<p><em><em>1. </em></em>Editing and Workflow Tools<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Non-linear Editing</strong></strong>: Offers a flexible editing timeline for cutting and trimming video clips.</li>\n\t\t\t\t<li><strong><strong>Multi-track Timeline</strong></strong>: Supports multiple video and audio tracks for complex editing projects.</li>\n\t\t\t\t<li><strong><strong>Nested Sequences</strong></strong>: Allows for the creation of composite sequences, making it easier to manage complex projects.</li>\n\t\t\t\t<li><strong><strong>Multi-Camera Editing</strong></strong>: Enables seamless editing of multi-camera footage, syncing and switching between different angles effortlessly.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>2. </em></em>Color Grading &amp; Correction<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Lumetri Color Panel</strong></strong>: Provides advanced tools for color grading and correction, including tools for primary and secondary color correction, color wheels, curves, and more.</li>\n\t\t\t\t<li><strong><strong>HDR Support</strong></strong>: Premiere Pro supports High Dynamic Range (HDR) color workflows, providing greater color detail and brightness for more immersive content.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>3. </em></em>Audio Editing and Mixing<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Integrated Audio Editing</strong></strong>: Features such as the Essential Sound panel and multi-channel audio mixing make it easy to adjust audio levels, clean up noise, and create professional audio mixes.</li>\n\t\t\t\t<li><strong><strong>Support for Adobe Audition</strong></strong>: Allows for deeper audio editing by exporting audio tracks to <strong><strong>Adobe Audition</strong></strong>&nbsp;for more advanced audio work.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>4. </em></em>Motion Graphics and Visual Effects<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Motion Graphics Templates</strong></strong>: You can easily add professional graphics with customizable templates for titles, lower thirds, and more.</li>\n\t\t\t\t<li><strong><strong>Integration with After Effects</strong></strong>: Dynamic Link lets you seamlessly import compositions from <strong><strong>Adobe After Effects</strong></strong>, allowing for complex visual effects and motion graphics workflows.</li>\n\t\t\t\t<li><strong><strong>VFX</strong></strong>: Premiere Pro supports a wide variety of <strong><strong>third-party plugins</strong></strong>&nbsp;for advanced visual effects, such as transitions, 3D rendering, and stylization effects.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>5. </em></em>VR and 360&deg; Video Editing<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Immersive Video Editing</strong></strong>: Premiere Pro allows editing of <strong><strong>360&deg; video</strong></strong>&nbsp;and <strong><strong>VR</strong></strong>&nbsp;content, including the ability to view, edit, and output spherical video footage.</li>\n\t\t\t\t<li><strong><strong>VR Effects and Transitions</strong></strong>: Specialized effects and transitions designed for VR content, enhancing the immersive experience.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>6. </em></em>Collaboration and Sharing<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Team Projects</strong></strong>: Premiere Pro&rsquo;s <strong><strong>Team Projects</strong></strong>&nbsp;feature allows multiple editors to work on the same project, in real-time, making collaboration smooth and efficient.</li>\n\t\t\t\t<li><strong><strong>Direct Export to YouTube and Vimeo</strong></strong>: Simplify the export process with presets for social media platforms and online video sharing.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>7. </em></em>File Formats and Exporting<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Wide Format Support</strong></strong>: Adobe Premiere Pro supports a vast array of file formats, including popular ones like <strong><strong>MP4, MOV, AVI, MXF</strong></strong>, and more, making it compatible with virtually all media formats.</li>\n\t\t\t\t<li><strong><strong>Export Presets</strong></strong>: Export video for various platforms including social media, websites, broadcast, and more, with preset settings for YouTube, Vimeo, Instagram, and others.</li>\n\t\t\t\t<li><strong><strong>GPU Acceleration</strong></strong>: Accelerates encoding and rendering using GPU support (CUDA, Metal, OpenCL), speeding up workflows.</li>\n\t\t\t</ul>\n\n\t\t\t<p><em><em>8. </em></em>Artificial Intelligence (AI) Powered Features<em><em>:</em></em></p>\n\n\t\t\t<ul>\n\t\t\t\t<li><strong><strong>Adobe Sensei AI</strong></strong>: Adobe&rsquo;s AI technology automates certain tasks like scene editing, color adjustments, and even audio cleanup to make workflows more efficient and intuitive.</li>\n\t\t\t\t<li><strong><strong>Auto Reframe</strong></strong>: Automatically adjusts video aspect ratios to suit different platforms like Instagram, TikTok, or YouTube.</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Video Conferencing Systems/ Webinar Platforms</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>High-Quality Video and Audio</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>HD Video</strong></strong>: Clear and crisp video quality, typically 1080p or higher, for professional-level meetings.</li>\n\t\t\t\t\t<li><strong><strong>Noise Cancellation</strong></strong>: Removes background noise to ensure clear communication.</li>\n\t\t\t\t\t<li><strong><strong>High-Definition Audio</strong></strong>: High-quality audio codecs (e.g., Opus, AAC) for clear sound.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Screen Sharing and Collaboration</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Screen Sharing</strong></strong>: Enables participants to share their screen for presentations, documents, and applications.</li>\n\t\t\t\t\t<li><strong><strong>File Sharing</strong></strong>: Users can upload and share files in real-time during meetings.</li>\n\t\t\t\t\t<li><strong><strong>Annotation</strong></strong>: Tools to annotate on shared screens or documents.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Multi-Device Support</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Cross-Platform</strong></strong>: Ability to host or join meetings from a variety of devices (laptops, tablets, smartphones, and even room systems).</li>\n\t\t\t\t\t<li><strong><strong>Mobile Apps</strong></strong>: Dedicated apps for iOS, Android, and other mobile platforms for ease of use on the go.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Collaboration Tools</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Breakout Rooms</strong></strong>: Divide participants into smaller groups for focused discussions.</li>\n\t\t\t\t\t<li><strong><strong>Whiteboarding</strong></strong>: Virtual whiteboards for brainstorming and collaboration.</li>\n\t\t\t\t\t<li><strong><strong>Chat and Messaging</strong></strong>: In-meeting chat features for side conversations and file sharing.</li>\n\t\t\t\t\t<li><strong><strong>Recording</strong></strong>: Option to record meetings for later review, training, or sharing with absent participants.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Security</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>End-to-End Encryption</strong></strong>: Protects the privacy of your conversations with secure encryption.</li>\n\t\t\t\t\t<li><strong><strong>Authentication</strong></strong>: Multi-factor authentication (MFA) to secure access to meetings.</li>\n\t\t\t\t\t<li><strong><strong>Access Control</strong></strong>: Permissions to mute participants, lock meetings, or restrict screen sharing.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Scheduling and Integration</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Calendar Integration</strong></strong>: Sync with calendars (e.g., Google Calendar, Microsoft Outlook) for easy scheduling.</li>\n\t\t\t\t\t<li><strong><strong>Integration with Productivity Tools</strong></strong>: Integration with apps like Slack, Microsoft Teams, Trello, or CRM tools to enhance workflows.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Scalability</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Large Meeting Capacity</strong></strong>: Some systems can support up to 1,000+ participants in a single call.</li>\n\t\t\t\t\t<li><strong><strong>Event Hosting</strong></strong>: Host webinars, live-streamed events, and large-scale conferences.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Room Systems</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Conference Room Equipment</strong></strong>: Dedicated video conferencing hardware like cameras, microphones, speakers, and touch panels for physical meeting rooms.</li>\n\t\t\t\t\t<li><strong><strong>PTZ Cameras</strong></strong>: Cameras with pan, tilt, and zoom functions for dynamic viewing.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Cloud and On-Premise Deployment</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Cloud-Based</strong></strong>: Web-based meetings hosted on the cloud, allowing flexibility and easy access from anywhere.</li>\n\t\t\t\t\t<li><strong><strong>On-Premise</strong></strong>: On-site deployment for companies that prefer to manage their own infrastructure.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Speakers</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Sound Quality</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Frequency Response</strong></strong>: The range of bass to treble that the speaker can reproduce, typically measured in Hertz (Hz). A wider range generally indicates a fuller sound.\n\t\t\t\t\t<ul>\n\t\t\t\t\t\t<li>Example: 20Hz - 20kHz is the standard range for most audio devices.</li>\n\t\t\t\t\t</ul>\n\t\t\t\t\t</li>\n\t\t\t\t\t<li><strong><strong>Total Harmonic Distortion (THD)</strong></strong>: The amount of distortion present in the sound. Lower THD (less than 1%) means cleaner, more accurate sound.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Power Handling</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Wattage</strong></strong>: The power the speaker can handle without distorting. Higher wattage generally provides louder sound.\n\t\t\t\t\t<ul>\n\t\t\t\t\t\t<li>Example: 50W - 200W for home speakers, 300W+ for large PA systems.</li>\n\t\t\t\t\t</ul>\n\t\t\t\t\t</li>\n\t\t\t\t\t<li><strong><strong>Sensitivity</strong></strong>: A measure of how efficiently the speaker converts power into sound. Higher sensitivity means more output with less power.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Impedance</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Ohms (&Omega;)</strong></strong>: The resistance of the speaker to the electrical current from an amplifier. Common values are 4&Omega;, 6&Omega;, or 8&Omega;. Most consumer audio equipment works well with 8&Omega; impedance.</li>\n\t\t\t\t\t<li>Lower impedance speakers can draw more power, but they require compatible amplifiers.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Size and Form Factor</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Driver Size</strong></strong>: Larger drivers (woofers and tweeters) typically provide better bass and a fuller sound. Common sizes are 4&quot;, 6&quot;, or 8&quot; for woofers, and 1&quot; to 2&quot; for tweeters.</li>\n\t\t\t\t\t<li><strong><strong>Cabinet Size</strong></strong>: Larger cabinets can produce deeper, richer bass. However, they might be less portable and more cumbersome in small spaces.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Connectivity</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Wired (Bluetooth, AUX, HDMI, RCA)</strong></strong>: Wired connections provide stable and reliable sound quality.</li>\n\t\t\t\t\t<li><strong><strong>Wireless (Bluetooth, Wi-Fi)</strong></strong>: Bluetooth and Wi-Fi connectivity allow for portable and multi-room setups.</li>\n\t\t\t\t\t<li><strong><strong>Smart Features</strong></strong>: Some speakers come with built-in smart assistants like Amazon Alexa, Google Assistant, or Apple Siri.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Audio Channels</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Mono vs. Stereo</strong></strong>: Mono speakers are used for single-channel audio (often in smaller, compact speakers), while stereo speakers provide two channels (left and right) for a richer audio experience.</li>\n\t\t\t\t\t<li><strong><strong>Surround Sound</strong></strong>: Some speakers (like soundbars or home theater systems) are designed to simulate surround sound, enhancing the cinematic experience.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Bass and Treble Control</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Many speakers allow you to adjust bass and treble for a custom sound profile.</li>\n\t\t\t\t\t<li>Bass ports or passive radiators can improve low-frequency response.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Durability and Water Resistance</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>IP Ratings</strong></strong>: If you plan to use your speakers outdoors or near water, look for models with an IP rating (e.g., IPX7 for water resistance).</li>\n\t\t\t\t\t<li><strong><strong>Build Material</strong></strong>: Durability may depend on the build, especially for portable outdoor speakers.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>9</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Portable Hard Drives</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Storage Capacity</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Portable hard drives typically range in storage capacity from <strong><strong>500GB</strong></strong>&nbsp;to <strong><strong>8TB</strong></strong>&nbsp;or more. The choice of capacity depends on the user&#39;s needs (e.g., storing photos, videos, games, documents, or backups).\n\t\t\t\t\t<ul>\n\t\t\t\t\t\t<li><strong><strong>500GB &ndash; 1TB</strong></strong>: Ideal for everyday files and documents.</li>\n\t\t\t\t\t\t<li><strong><strong>2TB &ndash; 4TB</strong></strong>: Suitable for users with large media files like photos, videos, and music.</li>\n\t\t\t\t\t\t<li><strong><strong>5TB &ndash; 8TB</strong></strong>: Ideal for professionals or users who need to store massive amounts of data, such as video editors, gamers, or photographers.</li>\n\t\t\t\t\t</ul>\n\t\t\t\t\t</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Drive Type</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>HDD (Hard Disk Drive)</strong></strong>: Traditional spinning drives that offer large storage at a more affordable price point. They tend to be slower than SSDs.</li>\n\t\t\t\t\t<li><strong><strong>SSD (Solid State Drive)</strong></strong>: Faster and more durable than HDDs, SSDs use flash memory and have no moving parts. They&#39;re ideal for users who need high-speed access to files.\n\t\t\t\t\t<ul>\n\t\t\t\t\t\t<li><strong><strong>HDD</strong></strong>: Offers larger capacities at a lower price per GB but slower read/write speeds.</li>\n\t\t\t\t\t\t<li><strong><strong>SSD</strong></strong>: Faster, more durable, and more compact but typically more expensive per GB.</li>\n\t\t\t\t\t</ul>\n\t\t\t\t\t</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Data Transfer Speed</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>USB 3.0/3.1/3.2</strong></strong>: The most common interface, offering data transfer speeds of <strong><strong>up to 5Gbps (USB 3.0)</strong></strong>, <strong><strong>10Gbps (USB 3.1)</strong></strong>, and <strong><strong>20Gbps (USB 3.2)</strong></strong>. These are good for most tasks, including media storage and backup.</li>\n\t\t\t\t\t<li><strong><strong>USB-C</strong></strong>: A newer connector standard offering faster data transfer rates (up to <strong><strong>40Gbps</strong></strong>&nbsp;with Thunderbolt 3/4) and improved versatility. Many modern laptops and smartphones support USB-C.</li>\n\t\t\t\t\t<li><strong><strong>Thunderbolt 3/4</strong></strong>: Offers very high-speed data transfer (up to <strong><strong>40Gbps</strong></strong>) and is commonly used for professional tasks, especially with SSD drives.</li>\n\t\t\t\t\t<li><strong><strong>eSATA</strong></strong>: Common for external HDDs, offering faster speeds than USB 2.0, but not as common as USB or Thunderbolt.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Portability</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Size &amp; Weight</strong></strong>: Portable hard drives are generally small enough to fit in a bag or pocket, with SSDs being lighter and more compact than HDDs.</li>\n\t\t\t\t\t<li><strong><strong>Design</strong></strong>: Some portable drives are designed to be rugged, with waterproof, dustproof, or shock-resistant features, which are essential for outdoor or on-the-go use.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Durability and Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Shock Resistance</strong></strong>: HDDs, in particular, are prone to damage from physical shock, so many portable drives come with shock-absorbing casings.</li>\n\t\t\t\t\t<li><strong><strong>Waterproof/Dustproof</strong></strong>: Some models come with IP ratings for water and dust resistance (e.g., <strong><strong>IP67</strong></strong>&nbsp;or <strong><strong>IP68</strong></strong>), providing additional protection for outdoor use.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Encryption and Security</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Password Protection &amp; Encryption</strong></strong>: Many modern portable hard drives come with built-in hardware or software encryption for data protection, especially important for sensitive information or business use.</li>\n\t\t\t\t\t<li><strong><strong>Backup Software</strong></strong>: Some drives include pre-installed backup software for easy file synchronization and backup.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Compatibility</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Cross-platform</strong></strong>: Most portable hard drives are compatible with both <strong><strong>Windows</strong></strong>&nbsp;and <strong><strong>Mac</strong></strong>&nbsp;systems, but users may need to format the drive for one of the operating systems.</li>\n\t\t\t\t\t<li><strong><strong>Plug-and-play</strong></strong>: Many external drives are plug-and-play, meaning no installation or drivers are required.</li>\n\t\t\t\t\t<li><strong><strong>Game Consoles</strong></strong>: Some models are designed to be compatible with gaming consoles like the <strong><strong>PS4</strong></strong>, <strong><strong>PS5</strong></strong>, <strong><strong>Xbox One</strong></strong>, or <strong><strong>Xbox Series X</strong></strong>, providing extra storage for games.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Memory Cards</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<p><strong><strong>256GB &ndash; 512GB</strong></strong>: Great for professional photographers, videographers, or anyone who needs high-capacity storage for large files.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>11</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Servers</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Processor (CPU)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Servers typically use high-performance CPUs, such as Intel Xeon or AMD EPYC, designed for multi-threaded tasks.</li>\n\t\t\t\t\t<li><strong><strong>Core Count</strong></strong>: Higher core counts (8, 16, 32, or more cores) are important for parallel processing, which enhances multitasking capabilities.</li>\n\t\t\t\t\t<li><strong><strong>Clock Speed</strong></strong>: Servers benefit from both high core counts and moderate to high clock speeds, typically between 2.0 GHz and 3.5 GHz, balancing processing power and efficiency.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Memory (RAM)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Servers generally require large amounts of RAM (16GB to 1TB+), depending on their use.</li>\n\t\t\t\t\t<li><strong><strong>Error-Correcting Code (ECC) RAM</strong></strong>&nbsp;is standard, as it corrects data errors and reduces system crashes, which is critical in server environments.</li>\n\t\t\t\t\t<li><strong><strong>DDR4 or DDR5</strong></strong>: Servers often use DDR4 for cost-effectiveness and stability, while newer servers may use DDR5 for improved speed and efficiency.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Storage</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Capacity</strong></strong>: Varies widely, from 1TB for small business servers to several petabytes for large enterprises.</li>\n\t\t\t\t\t<li><strong><strong>Type</strong></strong>: Options include HDDs (cheaper, higher capacity) or SSDs (faster but more expensive). NVMe SSDs offer even higher speeds than traditional SSDs.</li>\n\t\t\t\t\t<li><strong><strong>Redundancy and RAID</strong></strong>: RAID configurations (RAID 1, 5, 6, 10, etc.) are often used to provide data redundancy and improve read/write performance.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Networking</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Servers often come with high-bandwidth network interfaces, such as <strong><strong>10GbE, 25GbE, or even 100GbE Ethernet</strong></strong>&nbsp;ports.</li>\n\t\t\t\t\t<li>Network Interface Cards (NICs) with multiple ports allow for redundancy and load balancing.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Form Factor</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Rack-mounted</strong></strong>: Most enterprise servers use a rack-mount design, typically in 1U, 2U, or 4U sizes.</li>\n\t\t\t\t\t<li><strong><strong>Tower servers</strong></strong>: These are like traditional desktops, suitable for small offices with limited data requirements.</li>\n\t\t\t\t\t<li><strong><strong>Blade servers</strong></strong>: High-density servers that fit into a blade enclosure, ideal for data centers needing multiple servers in a compact space.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Power Supply and Redundancy</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Servers have redundant power supplies to ensure they stay operational if one fails.</li>\n\t\t\t\t\t<li>Uninterruptible Power Supply (UPS) units are also common to prevent data loss during power outages.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Operating System Compatibility</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Servers often run specialized OSes, such as <strong><strong>Linux distributions</strong></strong>&nbsp;(Ubuntu Server, CentOS, Red Hat), <strong><strong>Windows Server</strong></strong>, or hypervisors like <strong><strong>VMware ESXi</strong></strong>&nbsp;for virtualization.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>12</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>External Hard Drives</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Storage Capacity</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>1TB to 2TB</strong></strong>: Suitable for general personal storage, document backup, and storing smaller media collections.</li>\n\t\t\t\t\t<li><strong><strong>4TB to 8TB</strong></strong>: Ideal for larger media libraries, professional use, and more extensive backups.</li>\n\t\t\t\t\t<li><strong><strong>10TB and above</strong></strong>: Suited for large media files, video editing, and data archiving.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Drive Type</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>HDD (Hard Disk Drive)</strong></strong>: Offers higher capacities at a lower price. Suitable for general storage and backup but has slower read/write speeds.</li>\n\t\t\t\t\t<li><strong><strong>SSD (Solid State Drive)</strong></strong>: Faster, more durable, and often more compact. Ideal for quick file transfers, video editing, and frequent on-the-go use but typically more expensive per GB.</li>\n\t\t\t\t\t<li><strong><strong>NVMe SSDs</strong></strong>: Provide ultra-fast transfer speeds, ideal for high-performance tasks like video editing or gaming, though often limited in capacity and pricier.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Transfer Speed</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>USB 3.0 or 3.1</strong></strong>: Common on most external drives, with read/write speeds up to 600 MB/s, suitable for general usage.</li>\n\t\t\t\t\t<li><strong><strong>USB-C (3.1 or 3.2)</strong></strong>: Faster speeds and versatile connectivity, reaching up to 10 Gbps or more, compatible with newer laptops and devices.</li>\n\t\t\t\t\t<li><strong><strong>Thunderbolt 3/4</strong></strong>: Supports up to 40 Gbps, ideal for SSDs used in high-performance applications like video editing and gaming.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Durability and Portability</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Ruggedized Drives</strong></strong>: Shockproof, waterproof, and sometimes drop-proof designs are ideal for outdoor or on-the-go use.</li>\n\t\t\t\t\t<li><strong><strong>Compact SSDs</strong></strong>: Smaller, lightweight, and ideal for travel and frequent use.</li>\n\t\t\t\t\t<li><strong><strong>Enclosures</strong></strong>: Some drives offer additional protection from the elements or accidental drops.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Compatibility</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Most drives are compatible with both <strong><strong>Windows</strong></strong>&nbsp;and <strong><strong>Mac</strong></strong>&nbsp;OS, though some may require reformatting.</li>\n\t\t\t\t\t<li>Many external drives now offer cross-platform software for seamless use across operating systems.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Additional Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Encryption and Security</strong></strong>: Some drives come with built-in encryption for enhanced data security.</li>\n\t\t\t\t\t<li><strong><strong>Software</strong></strong>: Backup software and cloud integration can be a bonus for ease of use and extra protection.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>13</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Uninterruptible Power Supplies (UPS)</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Power Capacity (VA/W)</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Measured in <strong><strong>volt-amperes (VA)</strong></strong>&nbsp;and <strong><strong>watts (W)</strong></strong>. VA indicates the UPS&rsquo;s total capacity, while watts represent the actual power it can deliver.</li>\n\t\t\t\t\t<li>Common capacities range from <strong><strong>500VA</strong></strong>&nbsp;for small devices to <strong><strong>5000VA or higher</strong></strong>&nbsp;for servers and data centers.</li>\n\t\t\t\t\t<li><strong><strong>Rule of Thumb</strong></strong>: Choose a UPS with a watt rating about 20-30% higher than the total wattage of the devices it will support.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Battery Runtime</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>The amount of time the UPS can power devices during an outage. Typically, runtime varies from <strong><strong>5 minutes</strong></strong>&nbsp;for smaller UPS units to <strong><strong>several hours</strong></strong>&nbsp;for high-capacity models.</li>\n\t\t\t\t\t<li>Shorter runtime UPS units (5&ndash;10 minutes) are suitable for safe shutdowns; longer runtime models are ideal for critical systems.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Types of UPS</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Standby (Offline)</strong></strong>: Basic and affordable, ideal for home use. These activate only when a power loss is detected.</li>\n\t\t\t\t\t<li><strong><strong>Line-Interactive</strong></strong>: Provides moderate protection, adjusts for minor fluctuations, and is suitable for small business and home office setups.</li>\n\t\t\t\t\t<li><strong><strong>Online (Double-Conversion)</strong></strong>: Offers continuous power with no switching delay, ideal for critical systems like servers and medical equipment, as they provide high-level protection and voltage regulation.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Outlets and Connections</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Choose based on the number of devices you plan to connect. Some UPS models offer both <strong><strong>battery-backed outlets</strong></strong>&nbsp;(for crucial devices) and <strong><strong>surge-only outlets</strong></strong>.</li>\n\t\t\t\t\t<li><strong><strong>USB or Ethernet ports</strong></strong>&nbsp;are beneficial for managing and monitoring the UPS via software.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Form Factor</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Tower UPS</strong></strong>: Standalone units commonly used for desktop computers and workstations.</li>\n\t\t\t\t\t<li><strong><strong>Rack-mounted UPS</strong></strong>: Designed to fit into standard server racks, ideal for data centers and server rooms.</li>\n\t\t\t\t\t<li><strong><strong>Compact UPS</strong></strong>: Small units designed for home offices and single device protection.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Additional Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>LCD Display</strong></strong>: Provides real-time data on power status, battery level, and load.</li>\n\t\t\t\t\t<li><strong><strong>Automatic Voltage Regulation (AVR)</strong></strong>: Adjusts minor power fluctuations without using the battery, extending battery life.</li>\n\t\t\t\t\t<li><strong><strong>Hot-Swappable Batteries</strong></strong>: Allows battery replacement without shutting down the UPS, essential for business continuity.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>14</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Microsoft Office 365</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Office Applications</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Word</strong></strong>: Advanced word processing with real-time collaboration and cloud storage.</li>\n\t\t\t\t\t<li><strong><strong>Excel</strong></strong>: Robust spreadsheet program with data analysis tools and cloud integration.</li>\n\t\t\t\t\t<li><strong><strong>PowerPoint</strong></strong>: Presentation software with design, animation, and collaboration features.</li>\n\t\t\t\t\t<li><strong><strong>Outlook</strong></strong>: Email and calendar application integrated with cloud-based scheduling.</li>\n\t\t\t\t\t<li><strong><strong>Access</strong></strong>&nbsp;(PC only): Database management tool for creating and managing databases.</li>\n\t\t\t\t\t<li><strong><strong>Publisher</strong></strong>&nbsp;(PC only): Desktop publishing software for layouts, marketing materials, etc.</li>\n\t\t\t\t\t<li><strong><strong>OneNote</strong></strong>: Digital notebook for note-taking, available on all devices.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Cloud Storage</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>OneDrive</strong></strong>: Cloud storage solution with 1TB (or more) per user, allowing for easy access and sharing of files across devices. Files saved on OneDrive can be accessed and edited from any internet-connected device.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Collaboration Tools</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Microsoft Teams</strong></strong>: Integrated platform for communication, video conferencing, file sharing, and project collaboration.</li>\n\t\t\t\t\t<li><strong><strong>SharePoint</strong></strong>: Document management and sharing platform for team collaboration.</li>\n\t\t\t\t\t<li><strong><strong>Yammer</strong></strong>: Enterprise social networking service to improve internal communication.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>AI and Productivity Features</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Editor</strong></strong>: An AI-powered writing assistant integrated into Word and Outlook.</li>\n\t\t\t\t\t<li><strong><strong>Researcher and Smart Lookup</strong></strong>: In-app research tools for Word and Excel.</li>\n\t\t\t\t\t<li><strong><strong>Power BI</strong></strong>: Business analytics tools (separate subscription) for data visualization and business insights.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Security and Compliance</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Advanced security measures such as multi-factor authentication, data loss prevention, and compliance tools.</li>\n\t\t\t\t\t<li>Regular updates to meet security standards and add new features, ensuring data is protected.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Cross-Device Compatibility</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Microsoft 365 applications work on Windows, macOS, iOS, and Android devices, providing a seamless experience across desktop and mobile.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Automated Workflows</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li><strong><strong>Power Automate</strong></strong>: Automates repetitive tasks and integrates Microsoft 365 applications with hundreds of other services and apps.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>15</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Knowledge Management Software</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Centralized Knowledge Repository</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>A single platform to store documents, manuals, FAQs, guides, and other resources, making it easy to locate and retrieve information.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Search Functionality</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Advanced search tools allow users to quickly find information based on keywords, tags, or content type, often using AI for more intuitive search results.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Content Organization and Categorization</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Enables content to be categorized and tagged, making information easier to navigate and retrieve.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Collaboration Tools</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Built-in tools for team collaboration, allowing multiple users to co-author, edit, or update documents in real time.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Content Creation and Editing</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Tools to create and edit knowledge articles, guides, or documentation within the system, often with templates to streamline content creation.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Version Control and Document Management</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Ensures that users access the latest version of documents while maintaining a history of changes for auditing and reference.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Access Control and Permissions</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Allows administrators to set different access levels, ensuring sensitive information is available only to authorized users.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Analytics and Reporting</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Tracks usage patterns, user activity, and content effectiveness to identify frequently accessed information and gaps in available knowledge.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Knowledge Sharing and Distribution</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Tools for distributing knowledge through various channels, including emails, notifications, and integrations with other software.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Integration with Other Tools</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Integrates with CRM, project management, and productivity tools like Slack, Microsoft Teams, and Salesforce to facilitate seamless information flow.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Feedback and Improvement Mechanisms</strong></strong>\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Provides tools for users to give feedback on content, allowing continuous improvement of resources based on user needs and feedback.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.4000pt\">\n\t\t\t<p>16</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:125.4500pt\">\n\t\t\t<p><strong><strong>Antivirus Software</strong></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:200.6000pt\">\n\t\t\t<ol>\n\t\t\t\t<li><strong><strong>Real-Time Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Continuously monitors the system for threats, scanning files as they are accessed.</li>\n\t\t\t\t\t<li>Blocks and alerts users of potential threats as they occur.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Malware and Virus Scanning</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Scans files, downloads, and installed software to detect viruses, trojans, worms, and other malicious code.</li>\n\t\t\t\t\t<li>Can be configured for full, quick, or custom scans, allowing users to focus on specific folders or drives.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Behavioral Analysis</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Detects unusual behavior patterns to identify and block unknown or zero-day threats.</li>\n\t\t\t\t\t<li>Complements signature-based detection by recognizing suspicious actions instead of relying solely on known threat signatures.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Web Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Prevents access to malicious websites and phishing pages that could compromise user data.</li>\n\t\t\t\t\t<li>Some solutions offer browser extensions for added protection while browsing the internet.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Email Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Scans incoming and outgoing emails to detect phishing attempts, spam, and infected attachments.</li>\n\t\t\t\t\t<li>Crucial for businesses where email-based attacks are common.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Ransomware Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Specifically targets ransomware threats that encrypt files and demand payment.</li>\n\t\t\t\t\t<li>Includes features like file backup, encryption of sensitive data, and monitoring for ransomware behaviors.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Firewall Protection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Monitors incoming and outgoing network traffic, blocking unauthorized access.</li>\n\t\t\t\t\t<li>Helps secure the device from external attacks, particularly useful for systems connected to public networks.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Anti-Spyware and Anti-Adware</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Identifies and removes spyware and adware that track user behavior or serve unwanted ads.</li>\n\t\t\t\t\t<li>Ensures user privacy and protects sensitive data.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>System Optimization Tools</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Includes tools like disk cleanup, memory optimization, and junk file removal.</li>\n\t\t\t\t\t<li>Some antivirus programs offer features to improve system performance while securing the device.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Parental Controls</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Allows parents to set limits on websites and apps children can access.</li>\n\t\t\t\t\t<li>Useful for families to maintain safe browsing environments.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Device and Data Encryption</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Provides encryption options for files, folders, and entire drives to protect sensitive data.</li>\n\t\t\t\t\t<li>Helps secure data in case of theft or loss of the device.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Multi-Device and Cross-Platform Support</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Many antivirus programs offer support across multiple operating systems, such as Windows, macOS, Android, and iOS.</li>\n\t\t\t\t\t<li>Protects all devices under a single license, making it easier to secure personal and business environments.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Automatic Updates</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Regularly updates the virus database and software features to protect against new and emerging threats.</li>\n\t\t\t\t\t<li>Ensures that the software stays effective in detecting and blocking the latest malware.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t\t<li><strong><strong>Cloud-Based Threat Detection</strong></strong>:\n\t\t\t\t<ul>\n\t\t\t\t\t<li>Utilizes cloud-based databases to identify threats without needing large signature files on the local device.</li>\n\t\t\t\t\t<li>Often provides faster threat detection and reduces the software&#39;s impact on system performance.</li>\n\t\t\t\t</ul>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:170.1000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong><em>We confirm that we comply with the technical requirements or scope of services as detailed above.</em></strong></p>\n\n<p><strong>Authorized</strong><strong>&nbsp;By:</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:79.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Signature:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:186.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>___________________________</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:54.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:189.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>____________________________</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:79.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Position:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:186.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>___________________________</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:54.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:189.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>____________________________</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:265.5000pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Authorized&nbsp;for and on behalf of:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:54.0000pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:189.0000pt\">\n\t\t\t<p><em>(DD/MM/YY)</em></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:79.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Supplier:</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:429.2500pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>_________________________________________________________________</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Section E: Contract</strong></p>\n\n<p>THIS AGREEMENT made the _____ day of __________ 20_____ between [Name of the Purchaser]<em>&nbsp;</em>(hereinafter called &ldquo;the Purchaser&rdquo;) of the one part and <em>[name of Supplier]</em>&nbsp;of <em>[city and country of Supplier]</em>&nbsp;(hereinafter called &ldquo;the Supplier&rdquo;) of the other part:</p>\n\n<p>&nbsp;</p>\n\n<p>WHEREAS the Purchaser invited quotations for certain goods and ancillary services, and has accepted a quotation by the Supplier for the supply of those goods and services in the sum of <em>[contract price in words and figures]</em>&nbsp;(hereinafter called &ldquo;the Contract Price&rdquo;).</p>\n\n<p>&nbsp;</p>\n\n<p>NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The following documents shall be deemed to form and be read and construed as part of this Agreement, viz.:</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>(a) The Request for Quotations sent to the Supplier;</p>\n\n<p>(b) The Price Schedule submitted by the Supplier [<em>and the delivery period</em>] and</p>\n\n<p>(c) Schedule of Requirements and technical specifications.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>In consideration of the payments to be made by the Purchaser to the Supplier as hereinafter mentioned, the Supplier hereby covenants with the Purchaser to provide the goods and services and to remedy defects therein in conformity in all respects with the provisions of the Contract.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>The Purchaser hereby covenants to pay the Supplier in consideration of the provision of the goods and services and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract: [<em>Insert the methods of &nbsp;payment</em>].</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<p>IN WITNESS whereof the parties hereto have caused this Agreement to be executed in accordance with their respective laws the day and year first above written.</p>\n\n<p>.</p>\n\n<p>Signed, sealed, delivered by <u> </u>&nbsp;the <u> </u>&nbsp;(for the Purchaser)</p>\n\n<p>&nbsp;</p>\n\n<p>Signed, sealed, delivered by <u> </u>&nbsp;the <u> </u>&nbsp;(for the Supplier)</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;[<em>Name of the </em><em>Purchaser</em>]</p>\n\n<p>&nbsp;</p>\n\n<p>Quotation No __ of __/__/__</p>\n\n<p>Date of Price quotation __/__/__</p>\n\n<p>&nbsp;</p>\n\n<p>Opening date of Quotations ___/___/__ &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Place of Opening&nbsp;: __________</p>"},{"id":"OP00299120","notice_type":"Request for Expression of Interest","noticedate":"08-Jul-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-07-26T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Uzbekistan","project_id":"P168180","project_name":"Institutional Capacity Building Project","bid_reference_no":"MEF-SAMA-QCBS-SYSTEM-2","bid_description":"Development and Implementation of an Automated System of Accounting and Monitoring for the Activities of State-owned enterprises (SOEs)","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"29., Istiklol street, 100017 Tashkent","contact_ctry_name":"Uzbekistan","contact_email":"jasur.karshibayev@imv.uz","contact_name":"Jasur Karshibaev","contact_organization":"Ministry of Economy and Finance of the Republic of Uzbekistan","contact_phone_no":"+998903311662","contact_web_url":"info@imv.uz","submission_date":"2024-07-08T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST<br />\n(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Uzbekistan </strong></p>\n\n<p><strong>Institutional Capacity Building Project </strong></p>\n\n<p>Credit No.: IDA 6431-UZ</p>\n\n<p><strong>Assignment Title:</strong><strong> Development and Implementation of an Automated System of Accounting and Monitoring for the Activities of Enterprises with State Participation</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Reference No</strong>.: <strong>MEF-SAMA-QCBS-SYSTEM-2</strong></p>\n\n<p>&nbsp;</p>\n\n<p>The Ministry of Economy and finance of the Republic of Uzbekistan has received financing from the World Bank toward the cost of the Institutional Capacity Building Project and intends to apply part of the proceeds for consulting services on behalf of the State Assets Management Agency (UzSAMA).</p>\n\n<p>The Consulting services (&ldquo;the Services&rdquo;) include Development and Implementation of an Automated System of Accounting and Monitoring for the Activities of Enterprises with State Participation (&ldquo;Information system&rdquo;)</p>\n\n<p>The main purpose of the information system for accounting and monitoring the activities of enterprises with state participation is an organized data array of the UzSAMA, processed in a single hardware and software complex, which provides quick access to operational and historical information, multidimensional data analysis (KPIs for various dimensions), obtaining forecasts and statistics in terms of both the activities of the Customer and enterprises with a state share, regardless of the source of such information.</p>\n\n<p>The Ministry of Economy and finance of the Republic of Uzbekistan now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services submitting directly to the piu_mof@mail.ru.</p>\n\n<p>The qualification requirements for the Consultants are:</p>\n\n<ul>\n\t<li>General experience in implementing the consultancy contracts in the field of information systems implementation not less 7 years;</li>\n\t<li>Experience in implementing successfully completed projects for building business analysis systems (Business Intelligence) at least 3 projects in the last 7 years;</li>\n\t<li>Have authorization from the software manufacturer or its regional structural unit (if the tender participant is not the manufacturer of the offered product);</li>\n\t<li>Experience in CIS countries will be considered as additional asset</li>\n</ul>\n\n<p>The proposed team will have both the skills and experience necessary to undertake the range of tasks set out in these Terms of Reference. The Key experts will be not evaluation during review the EOI.</p>\n\n<p>The components of the System must have patent purity on the territory of the Republic of Uzbekistan.</p>\n\n<p>The attention of interested Consultants is drawn to Section III of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; dated July 2016, revised in November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp; In addition, please refer to the following specific information on conflict of interest related to this assignment: Consultants shall not be hired for any assignment that would be in conflict with their prior or current obligations to other clients, or that may place them in a position of being unable to carry out the assignment in the best interests of the Ministry of Finance of the Republic of Uzbekistan.</p>\n\n<p>A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations.</p>\n\n<p>Further information can be obtained at the address below during office hours from 9:00 a.m. to 18:00 p.m. Tashkent time.</p>\n\n<p>Expressions of interest must be delivered in a written form in English, Russian or Uzbek languages to the address below (in person, or by mail, or by e-mail) by July 26&nbsp;2024.</p>\n\n<p>&nbsp;</p>\n\n<p>Project Implementation Unit under the<br />\nMinistry of Economy and finance of the Republic of Uzbekistan</p>\n\n<p>Attn: Sirojiddin Imanov, Manager of the Project</p>\n\n<p>Uzbekistan, 100017, Tashkent city, 29, Istiklol St.</p>\n\n<p>Tel: +998901741711</p>\n\n<p>E-mail: <em>piu_mof@mail.ru</em></p>\n\n<p>&nbsp;</p>\n\n<p><em>As part of the EOI, the consultant should include the following information:</em></p>\n\n<ul>\n\t<li>Consulting Firm Information</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:490.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Date:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Country of Incorporation:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>Consultant Name:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Acronym:</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:265.5pt\">\n\t\t\t<p>EOI Submission Authorized by:</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:225.0pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ul>\n\t<li>Associations (Joint Venture or Sub-consultancy)</li>\n</ul>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:476.6pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:28.5pt; width:76.0pt\">\n\t\t\t<p>Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:59.95pt\">\n\t\t\t<p>Acronym</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:88.65pt\">\n\t\t\t<p>Country of Incorporation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:76.5pt\">\n\t\t\t<p>Joint Venture (JV) or Sub-consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>EOI Submission Authorized By</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.5pt; width:85.5pt\">\n\t\t\t<p>Position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">&nbsp;</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:59.95pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:88.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:76.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:90.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:85.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><em>Present the rationale for and benefits of working in association (JV or Sub-consultant) with others rather than undertaking the assignment independently (as appropriate). Describe the proposed management and coordination approach of the association and the role of each firm</em>.</p>\n\n<ul>\n\t<li><strong>Technical competence </strong></li>\n</ul>\n\n<p><em>Project References - highlight the technical qualifications of your entity/consortium in undertaking similar assignments. Provide details of past experiences working with similar project authorities</em></p>\n\n<ul>\n\t<li><strong>Geographical experience </strong></li>\n</ul>\n\n<p>Project References, present experiences in similar geographic areas.</p>\n\n<ul>\n\t<li><strong>Management Competence </strong></li>\n</ul>\n\n<ul>\n\t<li>Describe standard policies, procedures, and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.</li>\n\t<li>How your firm/consortium handles complaints concerning the performance of experts or quality of the reports submitted for previous and future assignments? What internal controls are in place to address and resolve complaints.</li>\n\t<li>How you ensure the quality of your firm&rsquo;s/consortium&rsquo;s performance over the life of assignments.</li>\n</ul>\n\n<ul>\n\t<li><strong>Projects references </strong></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:484.15pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; width:30.05pt\">\n\t\t\t<p>N</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:74.15pt\">\n\t\t\t<p>Project</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:3.0cm\">\n\t\t\t<p>Project start date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:71.9pt\">\n\t\t\t<p>Project end date (year, month, mandatory)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:50.6pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.65pt\">\n\t\t\t<p>Country</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:49.6pt\">\n\t\t\t<p>Firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; width:73.15pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">&nbsp;</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>&hellip;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:30.05pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:74.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:3.0cm\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:71.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:50.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:bottom; width:49.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.0pt; vertical-align:top; width:73.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Summary for the Projects listed above</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:9.95pt; vertical-align:top; width:472.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project Title</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; width:143.75pt\">\n\t\t\t<p>Country / Region</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Start Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Completion Date</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Continuous / Intermittent</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.6pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Client</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Participated lawyers in the project among the recommended personnel (full name)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.95pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Funding Source</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:9.3pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>Project description</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:143.75pt\">\n\t\t\t<p>The role of the consulting firm</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:13.55pt; vertical-align:top; width:328.5pt\">\n\t\t\t<p>(indicate your role and contribution in terms of men-months)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ul>\n\t<li><strong>Eligibility </strong></li>\n</ul>\n\n<p>We, the undersigned, certify to the best of our knowledge and belief:</p>\n\n<ul>\n\t<li>We have read the advertisement, including the terms of reference (TOR), for this assignment (YES/NO)</li>\n</ul>\n\n<ul>\n\t<li>Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the TOR for this activity (YES/NO)</li>\n</ul>\n\n<ul>\n\t<li>We confirm that the project references submitted as part of this EOI accurately reflect the experience of the specified firm/consortium. (YES/NO)</li>\n</ul>\n\n<ul>\n\t<li>Ensuing assignment resulting from our work product under this assignment, our firm, JV member or sub-consultant, and the expert(s) will be disqualified from short-listing and participation in the assignment.</li>\n</ul>\n\n<p>The lead entity and JV member or sub-consultant are NOT currently sanctioned by or other MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.</p>\n\n<p><strong>Terms of Reference (TOR) for development and implementation of an automated system of accounting and monitoring for the activities of SOEs </strong></p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>GENERAL INFORMATION</strong>\n\n\t<ol>\n\t\t<li><strong>Full name of the project and its symbol</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Full name of the project: &quot;Development and implementation of an automated system of accounting and monitoring for the activities of SOEs&quot; (hereinafter referred to as the &quot;System&quot;).</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Purchasers </strong>Ministry of Economy and Finance of the Republic of Uzbekistan- - manages administrative and financial issues.</p>\n\n<p>The final beneficiary of the project is the State Assets Management Agency of the Republic of Uzbekistan (hereinafter referred to as the &quot; Agency&quot;).</p>\n\n<p><strong>Requisites:</strong></p>\n\n<ul>\n\t<li>Address: 100000, Republic of Uzbekistan, Tashkent city, A.Temur&nbsp;avenue, 6</li>\n\t<li>Phone: (+998 71) 259-20-54.</li>\n\t<li>E-mail: info@davaktiv.uz</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Supplier</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The contractor for this project will be determined based on the results of the tender selection.</p>\n\n<p><strong>Basic requirements for the Supplier:</strong></p>\n\n<ul>\n\t<li>The performer should not be in the Unified Register of Unscrupulous Performers;</li>\n\t<li>Not to have improperly fulfilled obligations under previously concluded contracts;</li>\n\t<li>Have experience in implementing projects similar in scope and specifics to the subject of the tender over the past 7 years;</li>\n\t<li>Experience in the implementation of successfully completed projects on the construction of business analysis systems &ndash; at least 3 projects.</li>\n\t<li>Have authorization from the software manufacturer or its regional structural unit (if the bidder is not the manufacturer of the proposed product);</li>\n\t<li>Have certificates confirming the presence of certified specialists (at least 3) who are not involved in other projects on the platform proposed for implementation;</li>\n\t<li>The following requirements are imposed on the Supplier&#39;s specialists, which must be confirmed by the resumes provided:<em>&nbsp;</em></li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\" style=\"width:468.0pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p><strong>The role of the specialist</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<p><strong>Requirements</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>BI Project Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience with BI for at least 5 years;</li>\n\t\t\t\t<li>Experience in managing at least two BI projects;</li>\n\t\t\t\t<li>Possession of a full range of knowledge and skills of project management;</li>\n\t\t\t\t<li>Experience in managing a project team of 15 people.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>BI project architector</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience with BI for at least 5 years;</li>\n\t\t\t\t<li>Experience of participation in at least two projects for the development and implementation of BI class systems;</li>\n\t\t\t\t<li>Knowledge of programming languages on the database server;</li>\n\t\t\t\t<li>Experience in the design of class BI systems.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>BI Functional Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience with BI class systems for at least 3 years;</li>\n\t\t\t\t<li>Experience in participating in projects for the development and implementation of class BI systems;</li>\n\t\t\t\t<li>Knowledge of programming languages on the database server;</li>\n\t\t\t\t<li>Experience in preparing technical documentation.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>Financial consultant BI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience with BI class systems for at least 3 years;</li>\n\t\t\t\t<li>Experience in participating in projects for the development and implementation of class BI systems;</li>\n\t\t\t\t<li>Experience in financial analysis projects in various sectors of the economy - at least 3x;</li>\n\t\t\t\t<li>Knowledge of IFRS reporting.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>BI Technical Consultant</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience in working with data warehouses and BI class systems for at least 3 years;</li>\n\t\t\t\t<li>Experience in participating in projects for the development of data warehouses and implementation of BI class systems;</li>\n\t\t\t\t<li>Knowledge of programming languages on the database server;</li>\n\t\t\t\t<li>Experience in the preparation of technical documentation for the developed solutions.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>DBMS administrator</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:343.05pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Experience with BI for at least 3 years;</li>\n\t\t\t\t<li>Experience participating in at least 3 similar projects as a DB / BI administrator;</li>\n\t\t\t\t<li>Experience in administering BI environments.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>&nbsp;</em></p>\n\n<ul>\n\t<li>Not be at the stage of reorganization, liquidation or bankruptcy;</li>\n\t<li>Not be in a state of litigation or arbitration with the &quot;Agency&quot;;</li>\n\t<li>Not to have improperly fulfilled obligations under previously concluded contracts;</li>\n</ul>\n\n<p>In addition, in accordance with the legislation of the Republic of Uzbekistan, it is not allowed to participate in tenders of companies upon detection of:</p>\n\n<ul>\n\t<li>conflicts of interest;</li>\n\t<li>preliminary collusion of participants with the aim of distorting prices or results of selection of participants;</li>\n\t<li>manifestations of fraud, falsification and corruption.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Basis for development</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The basis for the development of the System project is:</p>\n\n<ul>\n\t<li>Decree of the President of the Republic of Uzbekistan No. UP-5630 dated September 14, 2019 &quot;On measures to radically improve the system of state assets management, antimonopoly regulation and the capital market&quot;;</li>\n\t<li>Resolution of the President of the Republic of Uzbekistan No. PP-1730<br />\n\tdated March 21, 2012 &quot;On measures for the further introduction and development of modern information and communication technologies&quot;;</li>\n\t<li>Minutes No. 5 of the meeting of the Republican Commission for Coordination of the Implementation of the Comprehensive Program for the Development of the National Information and Communication System of the Republic of Uzbekistan for 2013-2020 No. 01-08 / 1-417 dated 31.12.2014;</li>\n\t<li>Resolution of the President of the Republic of Uzbekistan dated April 28, 2020<br />\n\tNo. PP-4699 &quot;On measures for the widespread introduction of the digital economy and electronic government&quot;;</li>\n\t<li>Decree of the President of the Republic of Uzbekistan on October 5, 2020 No. UP-6079 &quot;On approval of the&quot; digital Uzbekistan-2030 &quot;strategy and measures<br />\n\tfor its effective implementation.&quot;</li>\n\t<li>Resolution of the Cabinet of Ministers of the Republic of Uzbekistan<br />\n\tNo. 273 dated 05/08/2020 &quot;On measures to improve the procedure for accounting for state property&quot;;</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Planned start and finish dates</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Planned project implementation timeline:</p>\n\n<p><strong>Start:&nbsp;</strong>October, 2024&nbsp;</p>\n\n<p><strong>Completion:&nbsp;</strong>October 2025</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Sources of financing</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A financing source for works under the project shall be the funds of the International Financial Institutions (The World Bank)</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>The procedure for registration and presentation of the results of work</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Upon completion of individual stages and work as a whole, the Supplier submits an acceptance certificate.</p>\n\n<p>The results of the work are evaluated by the acceptance committee.&nbsp;The acceptance committee is formed by the Agencyin the prescribed manner.</p>\n\n<p>To the Acceptance Commission, the Supplier submits documentation, the list<br />\nand requirements for registration of which are determined in accordance with State standards (GOST/ГОСТ) and other standards, and governing documents in force in the territory of the Republic of Uzbekistan, as well as by mutual agreement of the Agencyand the Supplier.</p>\n\n<p>The date of delivery - acceptance of work is the date of signing the act by the acceptance commission.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>PURPOSE OF THE SYSTEM AND OBJECTIVES OF PROJECT IMPLEMENTATION</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Purpose of the system</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The main purpose of the information system for accounting and monitoring the activities of SOEs is an organized data array of the Agency, processed in a single hardware and software complex, which provides quick access to operational and historical information, multidimensional data analysis (KPIs for various dimensions), obtaining forecasts and statistics in terms of both the activities of the Agencyand enterprises with a state share, regardless of the source of such information.&nbsp;This information can come from the following data sources:</p>\n\n<ul>\n\t<li>The Agency&#39;s own database - A single data source for the BI system ;\n\t<ul>\n\t\t<li>The personal account of the enterprise, posted on the information portal for submitting reports by joint-stock companies and other economic entities with a state share www.kpi.davaktiv.uz</li>\n\t\t<li>State property register www.property.davaktiv.uz</li>\n\t\t<li>Enterprise information systems;</li>\n\t\t<li>Information systems of state bodies (State Tax Committee, Customs Committee, Statistics Committee, Stock Exchange, Commodity Exchange)</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>During the implementation of the project of an information system for accounting and monitoring the activities of SOEs, the following tasks should be solved:</p>\n\n<ul>\n\t<li>Increasing the efficiency of information, analytical and management activities by automating functional areas and business processes related to the issues of making management decisions and creating a unified logical presentation of data;</li>\n</ul>\n\n<ul>\n\t<li>Implementation of management based on uniform information;</li>\n\t<li>Improving the quality of information provided for management decision-making;</li>\n\t<li>Separation of access rights to information;</li>\n\t<li>Providing a unified system of procedures for the formation of management reports;</li>\n\t<li>Bringing data from various sources into a single, easily understood format;</li>\n\t<li>Standardization and reduction of labor intensity of the reporting process.</li>\n\t<li>Increasing the use of analytical tools in the operational work of departments and the trust of end users.</li>\n\t<li>Reduced time to adapt business user requirements and implement changes.</li>\n\t<li>Reducing the total cost of maintaining reporting systems.</li>\n\t<li>Improving the performance of information systems and the efficiency of obtaining analytical data.</li>\n\t<li>Ensuring transparency of the Agency&#39;s activities;</li>\n\t<li>Formation of reports online;</li>\n\t<li>Reliable and secure data storage.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Project implementation goals</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Business intelligence systems are a type of information systems that allow you to turn accumulated factual data into useful knowledgein order to make effective business decisions.&nbsp;Such knowledge can be used to solve any problems in analysis, management, forecasting, etc.</p>\n\n<p>The purpose of introducing a business analysis system is to improve the efficiency of management of the operation and development of the Agency&#39;s Company, which is ensured by providing stakeholders,taking into account their powers, prompt access to consolidated from various sources, relevant and reliable information, fully characterizing the current state of the business and the dynamics of its development.</p>\n\n<p>The System will present data in a unified manner that will allow Users to form management, analytical and regulatory reporting.&nbsp;The business analysis system is created to perform complex and diverse functions, including the processing of analytical information, the formation of regulatory reporting and support for arbitrary requests.</p>\n\n<p><strong>The purpose of the system is:</strong></p>\n\n<ul>\n\t<li>Improving the efficiency of the reporting process;</li>\n\t<li>Improving the efficiency of the Agency&#39;s Assets management;</li>\n\t<li>Increasing the availability of the Agency&#39;s operational reporting in terms of key performance indicators and project management, including from mobile devices;</li>\n\t<li>Creation of a unified system of reporting on performance indicators;</li>\n\t<li>Organization of data collection on the results of interaction with Assets for making decisions to improve the efficiency of work with them;</li>\n\t<li>Reduction of labor costs for reporting preparation;</li>\n\t<li>Providing business users with the ability to independently build analytical reporting;</li>\n\t<li>Improving the quality and reducing the time required for the preparation and submission of analytical reports;</li>\n\t<li>Creation of a control system for key performance indicators in order to increase the speed of adoption and the quality of management decisions;</li>\n</ul>\n\n<p>To achieve the set goals within the framework of building the Agency&#39;s system, the following tasks must be solved:</p>\n\n<ul>\n\t<li>Creating a single tool for the formation of operational, consistent and reliable information on key performance indicators and work with Assets, necessary for making management decisions at the corporate management level;</li>\n\t<li>Creation of an interactive tool that allows filtering data, detailing data and uploading it to reporting forms, necessary to reduce the time for processing operational requests from the Agency&#39;s management;</li>\n\t<li>Creation of a role model and differentiation of access rights in the system;</li>\n\t<li>Performing the necessary system settings based on the requirements, design solutions, data model, dashboard layouts approved as part of the project work;</li>\n\t<li>Implementation of information exchange of the system with data sources;</li>\n\t<li>Training users to work in the system.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Expected deliverables</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>An internal portal must be implemented;</li>\n\t<li>With the help of the System, monitoring, analysis and control of the main indicators determined by the Agencyshould be carried out, as well as the formation of basic reports / dashboards according to these indicators with the possibility of their detailed decoding should be provided.</li>\n\t<li>The System should implement flexible analytical tools that allow considering indicators in different sections, providing filtering by various parameters, ensuring the delineation of the roles of access to data that meet the requirements for the composition of indicators and analysts;</li>\n\t<li>All project documentation has been completed in accordance with&nbsp;the documentation&nbsp;requirements;</li>\n\t<li>The System shall operate in a sustainable way, there shall be no complaints about quality of its operations (no freezes, logic operation errors, critical software failures, etc.).</li>\n</ul>\n\n<ol>\n\t<li><strong>CHARACTERISTICS OF THE INFORMATION OBJECT</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>General information</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Agency for State Assets Management of the Republic of Uzbekistan (hereinafter referred to as the Agency) was established by the Decree of the President of the Republic of Uzbekistan dated January 14, 2019 N UP-5630 &ldquo;On measures to radically improve the system of state assets management, antimonopoly regulation and the capital market.</p>\n\n<p>The Agency for State Assets Management of the Republic of Uzbekistan is a public administration body, the main activities of which are:</p>\n\n<ul>\n\t<li>Maintaining a unified state policy for the efficient management of state assets;</li>\n\t<li>Exercise of the right of a shareholder (founder and participant) on the state blocks of shares (shares) transferred to him in the authorized capital of SOEs;</li>\n\t<li>Implementation of modern methods and forms of corporate governance<br />\n\tin SOEs on the basis of best international practice, a radical increase in the role of shareholders and supervisory boards in their management;</li>\n\t<li>Assistance, including on the basis of recommendations of international financial institutions, of the gradual transformation of enterpriseswith state participation into efficient enterprises that can compete in the domestic and foreign markets;</li>\n\t<li>Coordination of the development and approval of strategies for the development of enterprises<br />\n\twith state participation, aimed at ensuring the efficiency and transparency of their activities, optimizing the management structure, high profitability and capitalization growth, withdrawing non-coreand unused assets;</li>\n\t<li>Implementation of investment activities ensuring the interests of the state, including by transferring state shares (stakes) to trust;</li>\n\t<li>Organization of a set of measures to attract investments, including foreign direct, as well as portfolio investments through the issuance and sale of bonds and shares of SOEs, including the placement of an IPO / SPO issue on domestic and foreign stock exchanges;</li>\n\t<li>Ensuring an open and transparent mechanism for the sale (privatization) and lease of state assets, monitoring the implementation of investment<br />\n\tand social obligations&nbsp;by investors&nbsp;, as well as participation in the development of proposals for public-private partnerships;</li>\n\t<li>Identification based on the analysis of idle, low-profit<br />\n\tand unprofitable SOEs, development and participation in the implementation of programs for their financial recovery and increasing the efficiency of their activities;</li>\n\t<li>Implementation of state policy on bankruptcy cases;</li>\n\t<li>Conducting, together with the Ministry of Economy and Finance of the Republic of Uzbekistan, an effective dividend policy in SOEs;</li>\n\t<li>Provision of state regulation of appraisal activities, approval of property appraisal standards, as well as certification of realtors.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p><strong>Also, the main participants in the project are:</strong></p>\n\n<p>SOEs.&nbsp;As of January 1,2020, the number of SOEs is 2,965 (257 JSCs, 990 LLCs, 1,718 SUEs), enterprises in which there is a share of SOEs of about 2 thousand.</p>\n\n<p><strong>State Tax Committee of the Republic of Uzbekistan&nbsp;</strong>- provision of data on NAS (tax and other mandatory payments, tax arrears, tax benefits, etc.);</p>\n\n<p><strong>State Customs Committee of the Republic of Uzbekistan&nbsp;</strong>- information on the volumes of import and export of goods and services;</p>\n\n<p><strong>State Committee of the Republic of Uzbekistan on Statistics&nbsp;</strong>- supplier of data on industry indicators;</p>\n\n<p><strong>Republican Stock Exchange&nbsp;</strong>- supplier of information on securities;</p>\n\n<p>The Uzbek Republican Commodity and Raw Materials Exchange is a supplier of information<br />\non the cost of products.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Architecture and composition of the current solution.</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The Agency is currently collecting and analyzing data as part of the management of state assets.&nbsp;At the same time, the main sources of data received by the Agency are:</p>\n\n<ul>\n\t<li>Own Agency Database - A single data source for the BI system;\n\t<ul>\n\t\t<li>Information portal for submitting reports by joint-stock companies<br />\n\t\tand other economic entities with a state share www.kpi.davaktiv.uz;</li>\n\t\t<li>State Property Register www.property.davaktiv.uz;</li>\n\t\t<li>Database of the State Tax Committee of the Republic of Uzbekistan.</li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong>Information portal&nbsp;of putting public companies report&nbsp;and other economic entities with state share&nbsp;</strong>(JSC, LLC, companies with state shares.)&nbsp;<strong>Kpi.davaktiv.uz&nbsp;</strong>- information resource, using the accounting records of the collection of key performance indicators (hereinafter &quot;KPI&quot;) and business plans from business entities with a state share (hereinafter the &ldquo;Subject&rdquo;).&nbsp;Each business entity with a state share has a personal account on the kpi.davaktiv.uz website.&nbsp;Access to your personal account is carried out using an electronic digital signature (hereinafter &ldquo;EDS&rdquo;) of a legal entity.&nbsp;In the personal account of the Subject there are electronic forms that are filled in by the Subject manually.&nbsp;The list of forms and the frequency of submission of reports is indicated in table.&nbsp;3.2.2.&nbsp;Control over the correctness of filling out the report is carried out by the Agency&#39;s specialists manually.&nbsp;When analyzing the submitted report, the Agency&#39;s specialist has the opportunity to both accept this report and return it for revision, indicating in the comments the reason for the discrepancy.</p>\n\n<p><strong>The register of state property property.davaktiv.uz&nbsp;</strong>is an information resource for registration and submission of reports for legal entities in the form of state unitary enterprises and state enterprises.&nbsp;The principle of access to a personal account, as well as monitoring of received reports, is similar to the information portal kpi.davaktiv.uz.&nbsp;The list of forms and the frequency of submission of reports is indicated in table.&nbsp;3.2.2.</p>\n\n<p><strong>Database of the State Tax Committee of the Republic of Uzbekistan&nbsp;</strong>- The database on objects of taxation and objects related to taxation is generated in electronic form in the territorial bodies of the state tax service at the location of the object on the basis of internal and external sources of information.&nbsp;Internal sources contain information on quarterly, annual financial reports, calculations of taxes and other obligatory payments, revised tax reports, explanatory notes, information and certificates provided by taxpayers to the state tax authorities.</p>\n\n<p>Data from the State Oil Company database are sent to the Agency in automatic mode and are indicated in table.&nbsp;3.2.2.</p>\n\n<p>All data from the above sources are fed into the local database of the Agency.&nbsp;The Agency&#39;s existing database has accumulated information with a depth of 2 years.</p>\n\n<p>The analytical layer is the information system (hereinafter &ldquo;IS&rdquo;) &ldquo;State property&rdquo; developed in 2018.</p>\n\n<p><strong>IS &ldquo;State Property&rdquo;&nbsp;</strong>is an analytical tool of the Agency, with the help of which the analysis and processing of data takes place.&nbsp;The users of the Information System &quot;State Property&quot; are the specialists of the Agency.&nbsp;The system has a role-based data access model.&nbsp;Information in the system is presented in tabular and graphical form.&nbsp;Completion and modernization of the system is carried out exclusively by the IT management specialists of the Agency.</p>\n\n<p>&nbsp;&nbsp;The architecture of the current solution is shown below in p.&nbsp;3.2.1</p>\n\n<p>&nbsp;</p>\n\n<p><br />\n<em>p. 3.2.1 Architecture of the current solution.</em></p>\n\n<p>&emsp;</p>\n\n<p>The composition of the internal and external systems of the Agency (Table 3.2.1):</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#bdd6ee; width:14.25pt\">\n\t\t\t<p>No.</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bdd6ee; width:128.3pt\">\n\t\t\t<p>System name</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bdd6ee; width:143.75pt\">\n\t\t\t<p>System Description</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#bdd6ee; width:151.85pt\">\n\t\t\t<p>Data retrieval method</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"width:470.55pt\">\n\t\t\t<p><strong>Internal systems of the </strong><strong>Agency</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:14.25pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:128.3pt\">\n\t\t\t<p>IS &quot;State Property&quot;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:143.75pt\">\n\t\t\t<p>Existing IS of business analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:151.85pt\">\n\t\t\t<p>The existing IS &quot;State Property&quot; receives data from the Agency&#39;s database</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:14.25pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:128.3pt\">\n\t\t\t<p>Agency DB</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:143.75pt\">\n\t\t\t<p>Existing DB</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:151.85pt\">\n\t\t\t<p>Formed database.&nbsp;The accumulation of the database comes from all of the following sources.&nbsp;The depth of historical data is 4 years.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:14.25pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:128.3pt\">\n\t\t\t<p>www.property.davaktiv.uz</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:143.75pt\">\n\t\t\t<p>Register of state property of registration and submission of reports for legal entities in the form of state unitary enterprises and state enterprises.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:151.85pt\">\n\t\t\t<p>Filling out forms posted on the web platform is carried out by enterprises in manual mode.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:14.25pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:128.3pt\">\n\t\t\t<p>www.kpi.davaktiv.uz</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:143.75pt\">\n\t\t\t<p>Information portal for submitting reports by joint-stock companies and other business entities in the form of JSCs, LLCs, enterprises with a state share.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:151.85pt\">\n\t\t\t<p>Filling out forms posted on the web platform is carried out by enterprises in manual mode.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"vertical-align:top; width:470.55pt\">\n\t\t\t<p><strong>External systems</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:14.25pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:128.3pt\">\n\t\t\t<p>STC DB</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:143.75pt\">\n\t\t\t<p>State Tax Committee database</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:151.85pt\">\n\t\t\t<p>Data collection from the STC DB collected on an automatic basis.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;3.2.1 Composition of internal and external systems.</em></p>\n\n<p>&nbsp;</p>\n\n<p>The composition of the reporting forms (Table 3.2.2)</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"5\" style=\"background-color:#bdd6ee; border-color:black; width:470.55pt\">\n\t\t\t<p>Accepted reporting forms</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:11.5pt\">\n\t\t\t<p>No.</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:107.75pt\">\n\t\t\t<p>Organizational and legal form</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:124.3pt\">\n\t\t\t<p>Reporting forms</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Periodicity</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:103.0pt\">\n\t\t\t<p>Fill / receive method</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"7\" style=\"width:11.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"7\" style=\"width:107.75pt\">\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Joint Stock Company (JSC);</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Limited Liability Company (LLC);</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Unitary enterprises (GUP)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:124.3pt\">\n\t\t\t<p>Reporting forms according to national accounting standards (NAS)</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Form No. 1 (small and medium enterprises)</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Form No. 2 (small and medium enterprises)</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Form No. 4 (Large enterprises)</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Form No. 5 (Large enterprises)</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:103.0pt\">\n\t\t\t<p>Accepted by the Agency in automatic mode from the database of the STC</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:124.3pt\">\n\t\t\t<p>Key performance indicators (KPI) reporting form</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:103.0pt\">\n\t\t\t<p>Filled in by enterprises manually on the web platform www.kpi.davaktiv.uz</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:124.3pt\">\n\t\t\t<p>Key performance indicators (KPI) reporting form for the financial and banking sector</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:103.0pt\">\n\t\t\t<p>Filled in by enterprises manually on the web platform www.kpi.davaktiv.uz</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:124.3pt\">\n\t\t\t<p>Key performance indicators (KPI) reporting form for insurance companies</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:103.0pt\">\n\t\t\t<p>Filled in by enterprises manually on the web platform www.kpi.davaktiv.uz</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:124.3pt\">\n\t\t\t<p>Reporting form - business plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:103.0pt\">\n\t\t\t<p>Filled in by enterprises manually on the web platform www.kpi.davaktiv.uz</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.3pt\">\n\t\t\t<p>Reporting form according to international financial reporting standards (IFRS) for enterprises</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of financial position</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of comprehensive income</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Cash flow statement</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of changes in equity</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:103.0pt\">\n\t\t\t<p>Tax Committee Database</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.3pt\">\n\t\t\t<p>Reporting form according to international financial reporting standards (IFRS) for the financial and banking sector</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of financial position</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Profit or loss statement</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of comprehensive income</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Cash flow statement</p>\n\n\t\t\t<p>&bull;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Statement of changes in equity</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:103.0pt\">\n\t\t\t<p>Tax Committee Database</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"5\" style=\"width:470.55pt\">\n\t\t\t<p>Management reporting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:11.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"width:242.85pt\">\n\t\t\t<p>Management reporting forms</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:80.8pt\">\n\t\t\t<p>Quarterly</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:103.0pt\">\n\t\t\t<p>Formed in the IS &quot;State Property&quot;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;3.2.2 Composition of reporting forms</em></p>\n\n<p>The information computer network of the Agency is a system of two components: an application server and a database server.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>TAS-IX</strong><strong> </strong><strong>Network</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>МСПД</strong> (interstate data transmission system)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Firewall all</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>Local computing</strong></p>\n\n\t\t\t<p><strong>network</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Applications server</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Database server</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Backup Applications</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Backup databases</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>p. 3.2.2. logical diagram of the existing technical complex</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>Key technical specifications for Application Server and Database Server:</p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"border-color:#a5a5a5; vertical-align:top; width:456.45pt\">\n\t\t\t<p><strong>Applications server</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:215.65pt\">\n\t\t\t<p><strong>Fujitsu Database Server Primary rx2530 m4</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:230.0pt\">\n\t\t\t<p>CPU Intel Xeon Silver 4110 8c 2.10 GHz 2x</p>\n\n\t\t\t<p>DDR4 32GB</p>\n\n\t\t\t<p>HDD SATA 6G 1TBx4 SSD 256Gbx2</p>\n\n\t\t\t<p>&nbsp;OS / Oracle Linux Unbreakable</p>\n\n\t\t\t<p>PSU 800W 2x</p>\n\n\t\t\t<p>LANs</p>\n\n\t\t\t<p>I350-AM2 (Onboard on D3383-A1x, on D3383-C1x</p>\n\n\t\t\t<p>Intel&reg; C620 Chipset (1Gb / 10Gb Ethernet) (Onboard on D3383-C1x, on D3383-A1x)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:456.45pt\">\n\t\t\t<p><strong>Database server</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:215.65pt\">\n\t\t\t<p><strong>Fujitsu Database Server Primary rx2530 m4</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:230.0pt\">\n\t\t\t<p>CPU Intel Xeon Silver 4110 8c 2.10 GHz 2x</p>\n\n\t\t\t<p>DDR4 32GB</p>\n\n\t\t\t<p>HDD SATA 6G 1TBx4 SSD 256Gbx2</p>\n\n\t\t\t<p>&nbsp;OS / Oracle Linux Unbreakable</p>\n\n\t\t\t<p>PSU 800W 2x</p>\n\n\t\t\t<p>LANs</p>\n\n\t\t\t<p>I350-AM2 (Onboard on D3383-A1x, on D3383-C1x</p>\n\n\t\t\t<p>Intel&reg; C620 Chipset (1Gb / 10Gb Ethernet) (Onboard on D3383-C1x, on D3383-A1x)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>&nbsp;Main challenges in working with the current information system: </strong></p>\n\n<ul>\n\t<li>Analysis, summary and monitoring of the reports received is carried out in manual mode;</li>\n\t<li>Formation of a new form of puffiness or making changes to it implies significant both human and time costs on the part of IT management;</li>\n\t<li>Changing the visualization of reporting forms also requires the involvement of IT management;</li>\n\t<li>With an increase in the amount of information stored in the Agency&#39;s database, the time for processing historical data increases significantly.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Organizational scope of the project</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Institutional scope of the project includes the State Assets Management Agency of the Republic of Uzbekistan with all regional offices.</p>\n\n<p>As of 01.01.2021 the Agency has the following territorial distribution (figure 3.2.1.2):</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>State Assets Management Agency</p>\n\n\t\t\t<p>of the Republic of Uzbekistan</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Rep. of Karakalpakstan</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Andijan region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Jizzakh region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Navoi region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Samarkand region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Syrdarya region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Khorezm region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Tashkent city</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Bukhara region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Kashkadarya region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Namangan region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Surkhandarya region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Ferghana region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>&nbsp;Tashkent region</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>1</p>\n\n\t\t\t<p>department</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>Total departments: 14</p>\n\n\t\t\t<p>Central department: 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Process volume</strong>\n\n\t\t<ol>\n\t\t\t<li><strong>Optimization and automation of business processes</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The scope of this Project includes the optimization and automation of business processes of reporting systems.&nbsp;Automation and carrying out on a regular basis the process of loading data from operational sources into an existing database, to consolidate information from various sources, to provide centralized quick access to data for business users.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>SYSTEM REQUIREMENTS</strong>\n\n\t<ol>\n\t\t<li><strong>System requirements as a whole</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The implementation of the System should be based on modern information technologies, as in the implementation of subject-oriented applied software systems that automate the execution of individual applied procedures and operations at all levels of the organizational hierarchy, a single information space based on a databank.</p>\n\n<p>The system should include the following subsystems:</p>\n\n<ul>\n\t<li>Data visualization subsystem</li>\n\t<li>Subsystem for allocating roles and access rights (component of security and access control for various categories of users)</li>\n</ul>\n\n<p>The system should provide opportunities for further development and modernization, including:</p>\n\n<ul>\n\t<li>Expansion of the number of enterprises and organizations;</li>\n\t<li>Expansion of the automated areas of activity of enterprises<br />\n\tand organizations, with coverage, depending on the type of activity of the enterprise.</li>\n</ul>\n\n<p>&nbsp;The system should be organized as follows:</p>\n\n<ul>\n\t<li>The core, which has the functions of storing analysis, correlation and reporting, should provide high interactivity of working<br />\n\twith consolidated data, flexible reporting in the form of the ability to perform unplanned (arbitrary) requests to data,<br />\n\tas well as the user self-service function (self-configuration of new analytical reports);</li>\n\t<li>Web interface that provides users with access to the System;</li>\n\t<li>Have an intuitive user interface;</li>\n\t<li>Provide data protection and delimit data according to the level of user access;</li>\n\t<li>Authentication and authorization of users in the system should be performed on the basis of credentials for managing the rights and powers of users;</li>\n\t<li>Integrate with external systems;</li>\n\t<li>Be able to conduct basic predictive analysis;</li>\n\t<li>Have a reporting and analysis tool;</li>\n\t<li>Have pre-configured interactive dashboards</li>\n\t<li>The system should have a modular structure.</li>\n</ul>\n\n<p>The system should provide for the ability to integrate with external information systems and databases using publicly available protocols such as:</p>\n\n<ul>\n\t<li>File exchange - directly or via FTP / SFTP protocols;</li>\n\t<li>SOAP - Simple Object Access Protocol, a structured messaging protocol in a distributed computing environment;</li>\n\t<li>ODBC - Open Database Connectivity, database access programming interface (API);</li>\n\t<li>RPC - Remote Procedure Call, a call to a remote procedure;</li>\n\t<li>RMI - Java Remote Method Invocation, a Java remote method invocation protocol for distributed object Java applications;</li>\n\t<li>COM, DCOM - Distributed Component Object Model, distributed component object model;</li>\n\t<li>Other.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the structure and functioning of the system</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The system should provide high interactivity of work<br />\nwith consolidated data, flexible reporting in the form of the ability to perform unplanned (arbitrary) queries to data, as well as provide an opportunity for users to work independently (self-configuration of new analytical reports).</p>\n\n<p><strong>General system requirements.</strong></p>\n\n<p>The system should be able to:</p>\n\n<ul>\n\t<li>Extract data from various sources, build a unified information model;</li>\n\t<li>Be a simple and flexible analysis tool for the business user;</li>\n\t<li>Integrate with various information systems (information sources);</li>\n\t<li>Integrate with the most popular office applications (Microsoft Office);</li>\n\t<li>To support processing of large volumes of data (the minimum amount of data is specified in clause 3.2. Participants in the procurement procedure can also be provided with sample reporting forms to assess the amount of data);</li>\n\t<li>Maintain audit and development control mechanisms with the ability to track changes in code and scripts;</li>\n\t<li>The presence of a visual environment for the development of processes and rules for data transformation and control with a ready-made set of components;</li>\n\t<li>Have advanced visualization and customization tools for reports;</li>\n\t<li>Provide ready-made reporting forms to the user in print, PDF / PPT / EXL format, by e-mail or through the analytical portal in their own format;</li>\n\t<li>Have interactive navigation - hierarchy transitions, navigation between report sheets, etc.</li>\n\t<li>Support the construction of hierarchical reports, embedding graphs and charts in reports;</li>\n\t<li>Support the construction of non-standard analytical queries (ad-hoc query) by business users;</li>\n\t<li>Store the results of request processing in the form of an analytical document (report, graph, diagram) for further work with it or publication on the analytical portal;</li>\n\t<li>Use powerful mathematical tools for working<br />\n\twith the received data, mechanisms for tracking changes, falling through hierarchies, setting up various kinds of notifications about deviations of values ​​from specified parameters;</li>\n\t<li>Support off-line work in the absence of communication<br />\n\twith sources;</li>\n\t<li>Use familiar business terms when referring to data;</li>\n\t<li>Support the construction of control panels, which can contain a large set of graphic elements (speedometers, graphs, diagrams, interactive maps) intended for the visual presentation of information;</li>\n\t<li>Support mobile analytics.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The system should contain the following subsystems:</p>\n\n<ul>\n\t<li><strong>Data visualization subsystem&nbsp;</strong>- designed to organize data presentation based on the data structure and develop the system user interface, including the development of data entry and display forms, reports and their printable forms, visualization tools for data samples in the form of diagrams and graphs.</li>\n\t<li><strong>Subsystem for allocating roles and access rights&nbsp;</strong>- a module containing a set of functions for user authentication and authorization, including maintaining its own user database and using an external authentication system, maintaining a role model, assigning roles to users according to their job duties, differentiating access and configuring them for users workspace within the system.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The reporting forms issued by the System must include:</p>\n\n<ul>\n\t<li>Financial reporting (in accordance with NAS and IFRS);</li>\n\t<li>Publication of reports on the implementation of business plans and KPIs;</li>\n\t<li>Publication of management reports;</li>\n\t<li>\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p><strong>Consumers of information</strong></p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>WEB platforms of the Agency</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>Agency staff</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p><strong>Sources of information</strong></p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>Agency assets</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>WEB platforms of the Agency</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>DB tax and customs committee</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p><strong>The Agency&#39;s existing database</strong></p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p><strong>Data visualization subsystem</strong></p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\n\t<table style=\"width:100%\">\n\t\t<tbody>\n\t\t\t<tr>\n\t\t\t\t<td>\n\t\t\t\t<p>Administration module</p>\n\t\t\t\t</td>\n\t\t\t</tr>\n\t\t</tbody>\n\t</table>\n\t<br />\n\tOther types of reporting.</li>\n</ul>\n\n<p><em>p 4.1. General software architecture</em></p>\n\n<p>&nbsp;</p>\n\n<p><strong>Basic functional principles of the system</strong></p>\n\n<p>The main principles that the Supplier should be guided by when choosing / designing the System are as follows:</p>\n\n<ul>\n\t<li>The Agency&#39;s existing Database is a single source of consistent data and should provide users with consistent quality data from various information systems;</li>\n</ul>\n\n<ul>\n\t<li>The data should be available to employees in the amount necessary<br />\n\tand sufficient to fulfill their functional duties;</li>\n\t<li>Employees must have a common understanding of the data, that is, a single semantic space must be established;</li>\n\t<li>It is necessary to eliminate conflicts in data encodings in source systems;</li>\n\t<li>Analytical computing should be separated from operational data processing;</li>\n\t<li>It is necessary to provide and maintain a tiered data organization;</li>\n\t<li>An evolutionary approach must be followed to ensure business continuity and preserve IT investments;</li>\n\t<li>The content of the existing Database and the commissioning of functional models are determined, first of all, by the requirements of business users;</li>\n\t<li>You need to ensure that your data is protected and stored securely.&nbsp;Information protection&nbsp;measures<br />\n\tmust be adequate to the value of the data.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the component composition and architecture of the solution</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The architecture of the System assumes the use of client-server technology with the ability to connect remote users through the WEB interface, as well as through a mobile application for mobile operating systems based on Android and iOS.</p>\n\n<p>For the functioning of the System, the data will be loaded<br />\nfrom the existing DBMS of the Agency.</p>\n\n<p>The composition of the software components of the Complex should correspond to the generally accepted structure of similar systems, and also represent an integral platform solution with a single metamodel, and not a set of disparate components.</p>\n\n<p>The main components of the platform:</p>\n\n<ul>\n\t<li>BI application;</li>\n\t<li>Visualization subsystem - Dashboards.</li>\n\t<li>Information security subsystems:</li>\n</ul>\n\n<ul>\n\t<li>Subsystem for allocating roles and access rights.</li>\n</ul>\n\n<p>The system under development should include the following technological components:</p>\n\n<ul>\n\t<li>Application Server: a set of applications that provide standard approaches to organizing directory services, deploying analysis and reporting services;</li>\n\t<li>Administration tools, reporting development and additional applications;</li>\n\t<li>Client places of employees - AWPs (inside the LAN).</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>Рис</em><em>. 4.1.1.2.1. Hi-level architecture of the system of accounting and monitoring of the activities of SOEs</em></p>\n\n<p>More detailed requirements are indicated in clauses 4.1.9 and 4.2.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Requirements for modes of operation</strong></p>\n\n<p>The software tools of the complex of the systems being implemented must operate around the clock and provide the ability to work in the following modes:</p>\n\n<p><strong>Normal mode&nbsp;</strong>(continuous round-the-clock work);</p>\n\n<p>Normal mode ensures the performance of system functions.&nbsp;This is the main mode of operation.&nbsp;In the normal operating mode of the system:</p>\n\n<ul>\n\t<li>Client software at users&#39; workplaces provides the possibility of round-the-clock operation with regulated breaks for maintenance and software updates;</li>\n\t<li>The server software enables 24/7 operation with scheduled maintenance and software update intervals.</li>\n</ul>\n\n<p>To ensure the normal operation of the system, it is necessary to comply with the requirements and maintain the operating conditions of the software specified in the relevant technical documents (technical documentation, operating instructions, etc.).</p>\n\n<p><strong>Service mode&nbsp;</strong>(for maintenance, reconfiguration and replenishment of new components).</p>\n\n<p>The service mode is intended for updating and preventive maintenance of software and hardware, changing the configuration of components.</p>\n\n<p>The service mode of operation is used to perform operations of preparation and conduct of regulations, tests or significant restructuring of the system.&nbsp;</p>\n\n<p>This mode also carries out maintenance, reconfiguration, modernization and improvement of the system.</p>\n\n<p>The mode allows diagnosing incidents or problems related to failures or accidents in the system.</p>\n\n<p>The service mode is intended primarily for routine maintenance and system maintenance:</p>\n\n<ul>\n\t<li>Maintenance of the complex of technical means of the system;</li>\n\t<li>Installation of system-wide and special software updates;</li>\n\t<li>Monitoring the performance of system components;</li>\n\t<li>Performing a cold backup of the database.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>List and description of scenarios for using information systems</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The use of the System implies the following scenario:</p>\n\n<p>A tool for operational business analysis - data will be presented in a unified manner, allowing Users to form management and analytical reporting.</p>\n\n<p>The model includes two main scenarios:</p>\n\n<ul>\n\t<li>Analysis and reporting on data received from SOEs.</li>\n</ul>\n\n<ul>\n\t<li>Consolidation of data and formation of a consolidated report.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>СИСТЕМа УЧЕТА И мониторинга</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><br />\n&nbsp;General model of using IS scripts:</p>\n\n<p>&nbsp;</p>\n\n<p>p. 4.1.4.1 &ldquo;General Scenario Model&rdquo;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>p. 4.1.4.2 </em>&ldquo;Script Action Diagram&rdquo;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Analysis and reporting on data received from the Assets of the Agency 001.</strong></p>\n\n<p>This scenario implies the receipt by the User of the Agency&#39;s management of data from SOEs, analysis of the enterprise and the formation of a report on the activities of the enterprise, taking into account the indication of the fulfillment of planned indicators.</p>\n\n<p>Process steps:</p>\n\n<ol>\n\t<li>User authorization in the system with the appropriate rights;</li>\n\t<li>The user analyzes the data received from SOEs;</li>\n\t<li>If the data is not correct, the user returns the data to the Asset for correction;</li>\n\t<li>&nbsp;If the data is correct, the User generates analytical reports, generates tabular and graphical reports;</li>\n\t<li>At the end of the formation of analytical reports, the User sends the finished report to the Central Office of the Agency.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Consolidation of data and formation of a consolidated report 002.</strong></li>\n</ul>\n\n<p>This scenario implies the receipt by the User of the Central Office of the Agency of data on the analytical report generated by the User of the Agency&#39;s management.&nbsp;The user of the Agency&#39;s Central Office consolidates data according to various criteria, generates a consolidated analytical report and publishes it in order to form an opinion on making certain decisions.</p>\n\n<p>Process steps:</p>\n\n<ol>\n\t<li>User authorization in the system with the appropriate rights;</li>\n\t<li>The User analyzes the data received from the User of the regional administration;</li>\n\t<li>The user consolidates the data;</li>\n\t<li>The user generates analytical reports both in tabular and graphical form (dashboards);</li>\n\t<li>The user publishes the generated data for the purpose of further decision-making.</li>\n</ol>\n\n<p>Additional scenarios for the actions of each subsystem included in the delivery of the System will be reflected in the appropriate additions to this technical assignment at the design and development stage of the system.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>System Diagnostic Requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Software diagnostics should be performed using standard system operating system modes, individual workstation operating systems, and by running a test case.</p>\n\n<p>Software modules must have components according to the testing and testing methodology, which allow to control the possibility of functioning of the main modes of operation of the modules.</p>\n\n<p>During the operation of the system, testing and diagnostics of software and hardware should be carried out by the system administrator in automatic mode when it starts.</p>\n\n<p>As part of the development of the Program and Test Methodology, a test case must be formed to ensure that the nodes are operable and that interacting information systems are connected both during the initial installation and loading of the database, and in the course of daily work.</p>\n\n<p>The test procedure will be carried out in accordance with the work plan indicated in Table 5.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the possibility of modernization and development of the system</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The system must be modernized and without a radical change in structure and composition, if it is necessary to use more modern high-performance technologies. Provide the ability to add new modules and additional systems (subsystem) to the existing software package or the ability to support a stepwise update - meaning that newer modules can be used in an existing system with previously installed ones. A software modularity approach should be provided.</p>\n\n<p>In this case, the minimum allowable service life of the System must be at least 10 years.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for interaction with third-party information systems</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Information interaction between the components of the System will be carried out on the basis of standard exchange formats.&nbsp;Methods and means of communication should provide:</p>\n\n<ul>\n\t<li>Using the TCP / IP protocol and various types of communication channels;</li>\n\t<li>Centralized management;</li>\n\t<li>Implementation of information protection functions, in accordance with the requirements for the protection of information transmitted through communication channels, set out in state and international standards.</li>\n</ul>\n\n<p>Data exchange with other information systems should be carried out according to agreed formats and data transfer protocols.</p>\n\n<p>The interaction of the System with third-party information systems is planned to be carried out using industrial integration tools.</p>\n\n<p>The system must support the use of a WEB client.&nbsp;Provide the ability to use any device (smartphone, tablet or PC).</p>\n\n<p>Information exchange between the ACS and external information systems should be carried out by calling the services provided by the components and using message queues.</p>\n\n<p>The system should be able to interact with the following external information systems (if technically possible):</p>\n\n<ul>\n\t<li>Databases and data warehouses of enterprises with state.&nbsp;participation;</li>\n\t<li>Information systems of enterprises with state.&nbsp;participation;</li>\n\t<li>Database of the State Tax Committee;</li>\n\t<li>Database of the State Customs Committee.</li>\n</ul>\n\n<p>The interaction of the System with third-party IS and scenarios of their use will be reflected in the corresponding technological instructions at the design stage.&nbsp;The technological instructions will indicate the protocols for receiving and transmitting data, the list and formats of the transmitted data and the lists of third-party databases used.</p>\n\n<p>When interacting with third-party information systems included in the National Information System, the requirements of O&#39;z DSt 2590 will be taken into account.</p>\n\n<p>In order to ensure a further increase in the functionality of the system, it should be possible to add a list of external information systems and the composition of information transmitted and received in the course of information exchange between participants in information interaction within the framework of the creation, operation and modernization of the System.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the number and qualifications of system personnel and their mode of work</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the number of personnel (users) of IS</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The preliminary number of users of the System is up to 200 internal users. The total number of personnel of users of the information system being implemented is determined by the Supplier at the stage of the Terms of Reference and is agreed upon by the protocol with the Agency. Detailed requirements for functional groups, composition, number, qualifications of personnel should be determined at the stage of development and Formation of requirements for the system in accordance with the organizational structure determined at the stage of inspection of the automation object.</p>\n\n<p>&nbsp;</p>\n\n<p>Below is the estimated planned number of users of the System.</p>\n\n<table cellspacing=\"0\" style=\"width:477.05pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:29.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:139.4pt\">\n\t\t\t<p><strong>Department / Management</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:226.35pt\">\n\t\t\t<p><strong>Position</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:81.4pt\">\n\t\t\t<p><strong>Number of users, people</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:1.0pt; width:29.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:1.0pt; width:139.4pt\">\n\t\t\t<p>Internal departments of UzSAMA</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Director, head, deputy</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>30</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Specialist, employee</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>70</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:1.0pt; width:29.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:1.0pt; width:139.4pt\">\n\t\t\t<p>Territorial administrations</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Director, head, deputy</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Specialist, employee</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>40</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"3\" style=\"height:1.0pt; width:29.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"3\" style=\"height:1.0pt; width:139.4pt\">\n\t\t\t<p>Other users of Ministries and departments</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Director, head, deputy</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Specialist, employee</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>20</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:1.0pt; width:226.35pt\">\n\t\t\t<p>Observer</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:1.0pt; width:81.4pt\">\n\t\t\t<p>10</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#2e75b5; height:1.0pt; width:29.9pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#2e75b5; height:1.0pt; width:139.4pt\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:226.35pt\">\n\t\t\t<p><strong>Director, head, deputy</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:1.0pt; width:81.4pt\">\n\t\t\t<p><strong>60</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:226.35pt\">\n\t\t\t<p><strong>Specialist, employee</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:81.4pt\">\n\t\t\t<p><strong>130</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:29.9pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:139.4pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:226.35pt\">\n\t\t\t<p><strong>Observer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2e75b5; height:5.6pt; width:81.4pt\">\n\t\t\t<p><strong>10</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Table 4.1.7.1.&nbsp;Planned number of users of the System</strong></p>\n\n<p>In total, the approximate number of users of the System is 200 users involved in control, monitoring, analysis, and reporting, of which 60 are managers (directors, managers, deputies), 10 are observers. The system must assume at least 5 concurrent system administrators.</p>\n\n<p>&nbsp;</p>\n\n<p>In this case, the main roles between users are as follows:</p>\n\n<p>Observer role: viewing reports;</p>\n\n<ul>\n\t<li>The role of the employee: creation / modification of reporting;</li>\n\t<li>The role of the manager : creating / changing / deleting reports;</li>\n\t<li>The role of the System administrator : full access to the System, including the ability to conduct developments in the development environment, testing and transfer to a productive system.\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the qualifications of personnel, the procedure for their training and control of knowledge and skills</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>Requirements for the procedure for training personnel of the System and control of knowledge and skills:</p>\n\n<p>&bull;&nbsp;The Supplier shall provide training separately for key users of the System;</p>\n\n<p>&bull;&nbsp;To control knowledge and skills in working with the System, questionnaires and a methodology for assessing the knowledge gained at the 5th stage should be developed (see Table 5.1).</p>\n\n<p>Depending on the areas of activity, users study functional Systems and basic principles of administration.</p>\n\n<p>It is possible to organize user training according to their roles in the System. During training, an emphasis is placed on the functionality of the System that is most in demand for the user&#39;s role.</p>\n\n<p>Additional requirements are specified in clause 6.3 of this technical assignment.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li>\n\t\t\t\t<ol>\n\t\t\t\t\t<li><strong>Required mode of operation of IS personnel</strong></li>\n\t\t\t\t</ol>\n\t\t\t\t</li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The staffing table of the System is also determined by the Supplier at the stage of development and Formation of requirements for the system and is agreed upon by the protocol with the Agency.&nbsp;The mode of operation of users is determined by the job descriptions of the personnel providing the solution of functional tasks.</p>\n\n<p>The operating mode of the service personnel should be determined based on the requirements for the time of the System operation.&nbsp;</p>\n\n<p>If it is necessary to ensure round-the-clock operation of the System, the organization of the on-call of the service personnel is required.&nbsp;Regardless of the operating mode of the System service personnel (normal or round-the-clock), the following must be ensured:</p>\n\n<ul>\n\t<li>All specialists should work with a normal work schedule no more than 8 hours a day;&nbsp;</li>\n\t<li>The system is implemented on personal computers, therefore, the requirements<br />\n\tfor the organization of work and the mode of rest when working with it should be established based on the requirements for the organization of work and the mode of rest when working with this type of computer equipment;</li>\n\t<li>To ensure maximum efficiency and preserve the health of professional users, regulated breaks should be established during the work shift: 2 hours after the start of the work shift and 1.5 - 2.0 hours after the lunch break, each 15 minutes long or 10 minutes long every hour of work;</li>\n\t<li>The duration of continuous work of personnel with the developed system and personal computers without a regulated break should not exceed 2 hours.&nbsp;&nbsp;</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Indicators of appointment</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The degree of adaptability of the system to changes in processes and management methods:&nbsp;</p>\n\n<ul>\n\t<li>The menus of the software complex should be grouped in accordance with the subject of information, functional tasks and technology of work with the possibility of changing the composition;&nbsp;</li>\n\t<li>The security administrator should be able to change user access rights to data and menus when the organizational structure, work technology or other factors affect the access rights to information;&nbsp;</li>\n</ul>\n\n<p><strong>System performance:&nbsp;</strong></p>\n\n<ul>\n\t<li>The system must meet the scalability requirements, that is, the software included in its composition must ensure the simultaneous operation of the required number of users by increasing the computing resources of the corresponding data centers;&nbsp;</li>\n\t<li>The inaccessibility of any information resource of the system should not affect the performance of the system as a whole;</li>\n</ul>\n\n<p>Appointment indicators characterizing the degree of compliance of the System with the requirements for it for organizational and economic Informatization systems, in which the managerial decision and its implementation depend on the person, are difficult to <strong>Indicators of the degree of conformity of the System to the purpose</strong></p>\n\n<table cellspacing=\"0\" style=\"width:468.55pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.75pt; width:20.55pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; width:112.65pt\">\n\t\t\t<p><strong>The name of the purpose indicators</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.75pt; vertical-align:top; width:332.35pt\">\n\t\t\t<p><strong>Explanation</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Reliability indicators</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>They characterize the functional compliance of the System with the stated goals and the ability of the System to perform the specified functions in various conditions</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1.1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Validity</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system must meet the stated goals and functional requirements of the technical specifications</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1.2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Security</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system must be able to prevent unauthorized access to data</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1.3</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Operability</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system should function in the specified modes in the absence of destabilizing influences</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1.4</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Consistency</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system and documentation must have unambiguous, consistent descriptions for the same objects, functions, terms, definitions, etc.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>1.5</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Sustainability</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system must have the ability to ensure continued operation of the System after the occurrence of deviations caused by destabilizing influences</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:49.5pt; width:20.55pt\">\n\t\t\t<p><strong>2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:49.5pt; width:112.65pt\">\n\t\t\t<p>Performance indicators</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:49.5pt; width:332.35pt\">\n\t\t\t<p>They characterize the degree of satisfaction of the user&#39;s need for obtaining information, taking into account the economic, time and other resources of the System&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>2.1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Performance</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system must be able to perform actions in the time interval that meets the specified requirements</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>2.2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Profitability</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system must be able to operate on the minimum resources of the System</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>3</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Manufacturability indicators</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>They characterize the technological aspects that make it easy to eliminate errors in the System</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>3.1</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Modifiability</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system should be capable of providing ease of making the necessary changes and improvements to the System during operation.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>3.2</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Repeatability</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The System should use typical design solutions or components</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:20.55pt\">\n\t\t\t<p><strong>3.3</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:112.65pt\">\n\t\t\t<p>Structurality</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:332.35pt\">\n\t\t\t<p>The system should consist of complexes that perform interrelated functions</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;4.1.7.1 Indicators of the degree of conformity of the System to the purpose</em></p>\n\n<p><em>&nbsp;</em></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Reliability requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Reliability indicators for the system should be determined by the current requirements for the reliability of automated information systems for authorities and authorities and can be specified in the technical design.&nbsp;Also in the technical project, methods and means of performing work in the event of system failures must be determined.</p>\n\n<p>System reliability indicators: - system availability factor 0.9997;&nbsp;- recovery time for the entire system is no more than 2 hours;&nbsp;- recovery time for individual subsystems is no more than 1 hour.</p>\n\n<p>Availability is determined by the ratio of the time spent by the system in a healthy state to the total operating time.</p>\n\n<p>Recovery time includes the time to identify an accident (failure) and eliminate its consequences.&nbsp;Including (if necessary) - restoring databases from archive copies.</p>\n\n<p><strong>The following requirements are imposed on the reliability of the equipment:</strong></p>\n\n<ul>\n\t<li>As hardware platforms, tools&nbsp;with increased reliability&nbsp;should be used;</li>\n\t<li>Application of technical means corresponding to the class of tasks to be solved;</li>\n\t<li>The software complex of the System must be able to recover in case of failures.</li>\n</ul>\n\n<p><strong>The following requirements are imposed on the reliability of power supply:</strong></p>\n\n<ul>\n\t<li>In order to increase the fault tolerance of the system as a whole, it is necessary to equip the servers with an uninterruptible power supply with the possibility of autonomous operation of the system for at least 15 minutes;</li>\n\t<li>The system should be equipped with a subsystem for notifying Administrators about the transition to an autonomous mode of operation;</li>\n\t<li>The system must be equipped with agents to automatically shutdown the operating system in the event that a power failure exceeds 15 minutes;</li>\n\t<li>uninterruptible power supply of active network equipment must be provided.</li>\n</ul>\n\n<p><strong>The reliability of software should be ensured through the following organizational measures:</strong></p>\n\n<ul>\n\t<li>Preliminary training for users and service personnel;</li>\n\t<li>Timely execution of administration processes;</li>\n\t<li>Compliance with the rules of operation and maintenance of software and hardware;</li>\n\t<li>Timely execution of data backup procedures.</li>\n\t<li>The reliability of the software of the subsystems should be ensured by:</li>\n\t<li>Reliability of the system-wide software and the Developer&#39;s software;</li>\n\t<li>Carrying out a set of measures for debugging, finding and eliminating errors.</li>\n\t<li>Keeping logs of system messages and errors by subsystems for subsequent analysis and configuration changes.</li>\n</ul>\n\n<p><strong>The reliability of the system being created is ensured by:</strong></p>\n\n<ul>\n\t<li>High adaptability of the developed software and organizational support, which makes it possible to preserve the information circulating in the system in case of failures and other situations that violate or destroy the stability of the system&#39;s functioning;</li>\n\t<li>Using uninterruptible power supplies;</li>\n\t<li>Hot backup of the most important nodes of the System, which include database servers, application servers, storage network components, equipment that provides communication between subsystems, as well as communication between users of each subsystem with database servers;</li>\n\t<li>The choice of the topology of telecommunications and local computer networks, providing variability in the routing of information flows;</li>\n\t<li>Duplication of information carriers;</li>\n\t<li>High level of qualifications and organization of work of the service personnel;</li>\n\t<li>Organization of maintenance, using modern methods and diagnostic tools;</li>\n\t<li>Using only licensed software products;</li>\n\t<li>Debugging and testing modules of all subsystems;</li>\n\t<li>Availability of comprehensive sets of technical documentation that ensure reliable operation of all modules of subsystems;</li>\n\t<li>The operation of subsystem modules, which should not cause destruction, distortion and / or loss of information stored in the applied automated information systems of the subjects of interaction of the System.&nbsp;</li>\n</ul>\n\n<p>The reliability of the first stage of the System should be ensured by the possibility of recovery in the event of emergencies related to:</p>\n\n<ul>\n\t<li>With the occurrence of failures or failure of software, hardware and software and hardware of the System;</li>\n\t<li>With communication channel failures;</li>\n\t<li>With power outages;</li>\n\t<li>With the implementation of computer attacks.</li>\n</ul>\n\n<p>Failures and malfunctions in the operation of software, hardware and (or) software and hardware of automated workstations of the System users should not lead to general destruction of the data stored in the System.&nbsp;The quantitative values ​​of the reliability indicators for the subsystems of the System, the achievement of which must be ensured, are presented in table 4.1.8.1</p>\n\n<p>The composition and description of the reliability indicators of the System are indicated in table 4.1.8.2</p>\n\n<p>&nbsp;&nbsp;</p>\n\n<p><strong>Values of reliability indicators</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p><strong>Index</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p><strong>Meaning</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:456.45pt\">\n\t\t\t<p>The whole system</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Time to identify and neutralize current threats to information security</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>no more than 5 hours (provided that the data is saved in the System)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Recovery time of parameters of normal functioning after the implementation of a computer attack</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>no more than 10 hours (provided that the data is saved in the System)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:456.45pt\">\n\t\t\t<p>Data visualization subsystem</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Reliability</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>10,000 hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Availability ratio</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>0.9995</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Availability</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>99.95%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Data loss tolerance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>1 hour in (provided that the data is saved in the System)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"3\" style=\"vertical-align:top; width:456.45pt\">\n\t\t\t<p>Subsystem of distribution of roles and differentiation of access rights</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Reliability</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>6000 hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Availability ratio</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>0.99</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Availability</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>99.9%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:12.1pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:278.2pt\">\n\t\t\t<p>Data loss tolerance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.55pt\">\n\t\t\t<p>12 hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;4.1.8.1 Values of reliability indicators</em></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Composition of reliability indicators for the System</strong></p>\n\n<table cellspacing=\"0\" style=\"width:851px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:15.9pt; width:18.45pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:102.1pt\">\n\t\t\t<p><strong>Index</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:15.9pt; width:389.8pt\">\n\t\t\t<p><strong>Description</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:66.55pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:66.55pt; width:102.1pt\">\n\t\t\t<p>Availability</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:66.55pt; width:389.8pt\">\n\t\t\t<p>Ability&nbsp;Systems&nbsp;perform&nbsp;coordinated&nbsp;function&nbsp;to&nbsp;within&nbsp;a specified&nbsp;time&nbsp;((time&nbsp;operation&nbsp;systems&nbsp;-&nbsp;while&nbsp;idle)&nbsp;/&nbsp;time&nbsp;operation&nbsp;Systems&nbsp;*&nbsp;100).&nbsp;Measured&nbsp;as a percentage</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:70.25pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:70.25pt; width:102.1pt\">\n\t\t\t<p>Availability ratio</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:70.25pt; width:389.8pt\">\n\t\t\t<p>The probability&nbsp;of&nbsp;that&nbsp;system&nbsp;will be&nbsp;in&nbsp;good working&nbsp;condition&nbsp;at&nbsp;an arbitrary&nbsp;moment&nbsp;of time,&nbsp;except for&nbsp;scheduled&nbsp;periods&nbsp;in&nbsp;during&nbsp;which&nbsp;the use of&nbsp;systems&nbsp;for other purposes&nbsp;not&nbsp;provided</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:35.1pt; width:18.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:35.1pt; width:102.1pt\">\n\t\t\t<p>Data loss tolerance</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:35.1pt; width:389.8pt\">\n\t\t\t<p>Allowable&nbsp;period of&nbsp;time&nbsp;for&nbsp;which&nbsp;System&nbsp;data&nbsp;may&nbsp;be&nbsp;lost&nbsp;.&nbsp;Measured&nbsp;in&nbsp;hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:49.15pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:49.15pt; width:102.1pt\">\n\t\t\t<p>Time to recovery</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:49.15pt; width:389.8pt\">\n\t\t\t<p>Time&nbsp;interval&nbsp;from the&nbsp;moment of&nbsp;failure&nbsp;(detection of&nbsp;failure) of the&nbsp;System&nbsp;until the&nbsp;moment of restoration of its&nbsp;operational state.&nbsp;Measured in hours&nbsp;&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:55.55pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:55.55pt; width:102.1pt\">\n\t\t\t<p>Reliability</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:55.55pt; width:389.8pt\">\n\t\t\t<p>The property of the&nbsp;System to&nbsp;continuously&nbsp;maintain an operational state&nbsp;for&nbsp;some&nbsp;time,&nbsp;or</p>\n\n\t\t\t<p>developments.&nbsp;Measured&nbsp;in&nbsp;hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:56.95pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:56.95pt; width:102.1pt\">\n\t\t\t<p>Time&nbsp;identifying&nbsp;and neutralization of actual threats to information security</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:56.95pt; width:389.8pt\">\n\t\t\t<p>The permissible&nbsp;period of&nbsp;time&nbsp;for&nbsp;which&nbsp;it is necessary&nbsp;to identify&nbsp;and&nbsp;neutralize the&nbsp;actual&nbsp;threats to the&nbsp;security of the&nbsp;System&#39;s&nbsp;information&nbsp;.</p>\n\n\t\t\t<p>Measured&nbsp;in hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:64.05pt; width:18.45pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:64.05pt; width:102.1pt\">\n\t\t\t<p>Restoration time of&nbsp;parameters of normal operation&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;after</p>\n\n\t\t\t<p>implementation of a computer attack</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:64.05pt; width:389.8pt\">\n\t\t\t<p>The duration of the&nbsp;restoration&nbsp;of the&nbsp;System&nbsp;&#39;s&nbsp;operational&nbsp;state&nbsp;after the&nbsp;implementation of a&nbsp;computer&nbsp;attack.</p>\n\n\t\t\t<p>Measured&nbsp;in hours</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;4.1.8.2 Composition of reliability indicators for the System</em></p>\n\n<p><em>&nbsp;</em></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Safety requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The required level of security must be ensured by the Agencythrough strict adherence to the rules of operation and maintenance of equipment recommended by the Suppliers and developers of informatization tools.</p>\n\n<p>Installation and commissioning of the system, as well as its subsequent maintenance should not be associated with exposure of personnel to dangerous values ​​of electric current, electromagnetic fields, acoustic noise, vibrations, etc.</p>\n\n<p>The design of the technical means must ensure the protection of service personnel from electric shock in accordance with the requirements of GOST 12.2.003 and GOST 12.2.007.0.</p>\n\n<p>The premises where the technical means of the system will be located must comply with the requirements of the guidance document RH 45-201: 2011.</p>\n\n<p>All external elements of the Complex&#39;s technical means that are energized must be protected from accidental contact, and the technical means themselves must have grounding or protective grounding in accordance with GOST 12.1.030-81.</p>\n\n<p>The power supply system must provide protective shutdown in case of overloads and short circuits in order to load, as well as emergency manual shutdown.</p>\n\n<p>The design of technical means should provide free access to individual units and elements for their maintenance and repair, convenient connection of power cables.</p>\n\n<p>All equipment included in the Complex must be serial and have appropriate certificates of conformity.</p>\n\n<p>The security of the premises in which the technical means of the Complex will be located should be ensured by the appropriate working group at the enterprise, responsible for both the operation of the system as a whole and for the implementation of this Terms of Reference.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for protecting information from unauthorized access</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The System should provide for control and management tools that restrict the rights of users of the System for accounting and monitoring the activities of SOEs.</p>\n\n<p>Access to the System for recording and monitoring the activities of SOEs should be provided only for registered users who have passed the identification and authentication procedure.</p>\n\n<p>&quot;Protection of information from unauthorized access&quot; must be ensured by a set of technical (hardware and software) security means of the System, including:</p>\n\n<ul>\n\t<li>The system of security video surveillance of the perimeter and premises of the server part of the system.</li>\n\t<li>Authentication tools for users and elements of the System (workstations, engineering infrastructure management systems, etc.).</li>\n\t<li>Means of response to detected attempts of unauthorized access, both n premises and technical means.</li>\n\t<li>Means of protection against the penetration of computer viruses and the destructive impact of malware into the Systems affected by these vulnerabilities.</li>\n</ul>\n\n<p>The information protection system of the system in terms of protecting local area networks and workstations must comply with the requirements of national standards:</p>\n\n<ul>\n\t<li>O&#39;zDSt 2927: 2015 &ldquo;Information technology.&nbsp;Information Security.&nbsp;Terms and Definitions&quot;;</li>\n\t<li>O&#39;zDSt ISO / IEC 27001: 2016 Information technology.&nbsp;Methods for ensuring the security of the information security management system.&nbsp;Requirements;</li>\n\t<li>O&#39;zDSt ISO / IEC 27002: 2016 Information technology.&nbsp;Security methods.&nbsp;Practical rules for information security management.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the differentiation of access rights</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The system must meet the following requirements for managing data access rights within the system:</p>\n\n<ul>\n\t<li>The ability to restrict system users access only to the level of information and data that they need to perform their work functions, which are configured by the system administrator;</li>\n\t<li>Active Directory domain authentication;</li>\n\t<li>The ability to organize access to the application via HTTPS;</li>\n\t<li>The ability to customize the hierarchical structure of departments, offices and services of the Agency within the system, add users to various pre-configured groups, according to the organizational structure;</li>\n\t<li>The ability to assign users certain roles, and restrict access to data depending on the role;</li>\n\t<li>The ability to configure rights within a role separately for each object / system registry, in the context of the following privileges:\n\t<ul>\n\t\t<li>Creation;</li>\n\t\t<li>Reading;</li>\n\t\t<li>The change;</li>\n\t\t<li>Removal;</li>\n\t\t<li>Providing individual access;</li>\n\t</ul>\n\t</li>\n\t<li>Prevent users from accessing data that they should not be able to access by assigned role or individually assigned access.</li>\n\t<li>The ability to provide access to analytics data according to the user&#39;s role level.</li>\n\t<li>The ability to customize the hierarchical organizational structure of employees within the system, and assign access to data depending on the position within this structure (for example, the 1st level manager has access to the data of his subordinates of the 2nd level, managers of the 2nd level have access to their subordinates 3rd level).&nbsp;The ability to customize the depth of access within the hierarchy (the number of levels down) for managers;</li>\n\t<li>Possibility of visual tree-like display of the configured user hierarchy and subordination structure in the organization;</li>\n</ul>\n\n<p>The name of the roles, their rights and the description of access should be generated at the &ldquo;Design&rdquo; stage.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the safety of information in case of accidents</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The system of accounting and monitoring of the activities of SOEs should provide for the means of backing up, archiving and restoring data.</p>\n\n<p>The servers on which the information system operates must be provided with uninterruptible power supplies for at least 15 minutes to shut down the operating system and applications when the primary power supply is interrupted.</p>\n\n<p>Emergency situations for which the safety of information in the System for recording and monitoring the activities of SOEs should be ensured:</p>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Characteristics of the emergency</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Measures to ensure the safety of information in the System</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Emergency elimination time</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Power outage</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Application of uninterruptible power supply devices;</li>\n\t\t\t\t<li>Application of stand-alone alternators.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Equipment support for at least 20 minutes;</li>\n\t\t\t\t<li>Automatic start within no more than 15-30 seconds</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Failure (failure) of hard disk drives (disk array) of the server</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Backing up data to external media</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Organization of disk arrays using the technology of RAID levels 0, 1, 5 or 10;</li>\n\t\t\t\t<li>Storage and automatic redistribution of information to spare disks for at least 20 minutes</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Failure (failure) of the server (processor, power supply, RAM, etc.)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Carrying out diagnostics of the state of technical means using the tools supplied as part of the technical means;</li>\n\t\t\t\t<li>Duplication of critical server elements</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Automatic transition of all functioning systems to a backup platform</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Failure (failure) of the system software</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Diagnostics of the state of the system software using the tools supplied as part of the system software;</li>\n\t\t\t\t<li>Backing up data to external media</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:144.95pt\">\n\t\t\t<p>Restore a saved backup within 15 minutes</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>A complete list of failures and their criteria will be clarified during the design and implementation of the project.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for protection against the influence of external influences</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>In the premises with the located technical means, on which the System operates, climatic conditions must be ensured, determined by the requirements of the manufacturers of the used technical means.</p>\n\n<p>Special requirements for protection against influence&nbsp;external influences are not presented.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Ergonomic and technical aesthetics requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>While working with the system, the operating personnel of the system should not experience the inconvenience associated with improper organization of the workplace or human interaction with the elements of the system.</p>\n\n<p>The equipment of the workplaces of the administrative personnel of the subsystem should ensure a continuous operation in the normal mode (without the need to leave the workplace to carry out production operations) a cycle of work in accordance with the operational and technological documentation.</p>\n\n<p>AWS of users of the System must be equipped in accordance with SanPiN No. 0205-06 &quot;Sanitary rules and hygienic requirements when working on personal computers, display terminals&quot;.</p>\n\n<p><strong>&nbsp;</strong></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the operation, maintenance, repair and storage of system components</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The system must be designed for operation as part of the Agency&#39;s software and hardware complex.&nbsp;Technical and physical protection of the hardware components of the System, data carriers, uninterrupted power supply, resource reservation, routine maintenance is carried out by the technical<br />\nand organizational means of the Agency.</p>\n\n<p>Periodic maintenance of the used technical means must be carried out in accordance with the requirements of the technical documentation of the Supplier</p>\n\n<p>It must be possible to operate the Complex around the clock.</p>\n\n<p>Installation kits of the Complex should be kept by system administrators in rooms with limited controlled access.</p>\n\n<p>To store and restore data in the system, DBMS tools or internal software tools of the Complex must be used.&nbsp;The implementation of these requirements must be ensured by appropriate organizational measures - routine maintenance of the system.</p>\n\n<p>Requirements for operation and maintenance procedures for technical means (equipment) of the system are determined by the relevant operational documents and instructions from the manufacturer of the relevant equipment.</p>\n\n<p>Requirements for operation and maintenance procedures required for the functioning of the Complex, system software (operating system, database, etc.) are determined by the relevant operational documents and instructions from the software manufacturer.</p>\n\n<p>Requirements for the permissible areas for accommodating the Service personnel of the Complex are determined in accordance with the requirements of labor protection and safety standards established in the Republic of Uzbekistan.</p>\n\n<p>Requirements for the placement of technical means, the parameters of power supply networks and the operating conditions are developed on the basis of the corresponding technical conditions for the deployed hardware.</p>\n\n<p>&nbsp;&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for patent and license purity</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The contractor must provide evidence of the patent frequency of the solution used in the form of licensing agreements or a license purchase agreement.</p>\n\n<p>The components of the System must be patent-free on the territory of the Republic of Uzbekistan.</p>\n\n<p>The components of the System must meet the requirements for patent purity in accordance with the current legislation of the Republic of Uzbekistan.</p>\n\n<p>Copyright and property rights to the software provided are determined in accordance with the legislation of the Republic of Uzbekistan.</p>\n\n<p>When using programs (software systems or modules) developed by third parties, the conditions on which the right to use (execute) these programs is transferred should not impose restrictions that prevent the use of the system for its intended purpose.</p>\n\n<p>The supplier is liable in case of violation of the rights of third parties to own the intellectual property and copyrights of third parties.</p>\n\n<p>Non-exclusive rights to the software of the System are transferred to the extent that guarantees the absence of claims from third parties.</p>\n\n<p>The System must use licensed software.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for standardization and unification</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>When implementing this project, the standards in force in the Republic of Uzbekistan should be accepted for guidance.</p>\n\n<p>The equipment should use standard interfaces, technologies and data transfer protocols.&nbsp;The use of non-standard solutions is allowed in case of a significant increase in the efficiency of the system or the impossibility of using standard approaches.</p>\n\n<p>Software and hardware that are subject to mandatory certification in accordance with the current legislation of the Republic of Uzbekistan must have appropriate certificates.</p>\n\n<p>Unification at the stage of implementation of the System should be ensured by a uniform approach to solving the same type of control and management tasks (typing algorithmic modules) and the creation of unified components of information, linguistic, software and hardware.</p>\n\n<p>The interaction of users with the application software included in the System should be carried out through a visual graphical interface (GUI).</p>\n\n<p>Communication should include:</p>\n\n<ul>\n\t<li>use of unified data transfer formats and protocols.</li>\n\t<li>a unified system of classification and coding of information;</li>\n\t<li>use of standard accounting and reporting documents.</li>\n</ul>\n\n<p>As part of the System software, uniform unified international classifiers and classifiers of the Republic of Uzbekistan should be used.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the degree of adaptability of the system to changes</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>It is necessary to provide for changes in the automation object:</p>\n\n<ul>\n\t<li>Change in the number of system users;</li>\n\t<li>Changing the physical location of workplaces within working groups;</li>\n\t<li>Changing the composition and number of working groups of users;</li>\n</ul>\n\n<p>To provide flexible control over the movement of workplaces<br />\nwithin any one object, provide ways to reconfigure the system:</p>\n\n<ul>\n\t<li>At the level of physical switching of patch cables,</li>\n\t<li>At the level of changing the configuration of active network devices.</li>\n</ul>\n\n<p>The operation of the system should not depend on the type of computing devices used (computing platform), and allow the possibility of their replacement with equipment of a different type.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Software technical support requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The technical support of the processing solution software should provide a service hotline 24 hours a day * 7 days a week * 365 days a year for telephone consultations and, if necessary, remote access to the system for urgent problem solving.</p>\n\n<p>The contractor must have a system for registering applications and monitoring them.</p>\n\n<p>The contractor provides a guarantee for a period of 12 months.&nbsp;During the warranty period, software errors are corrected free of charge.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Requirements for the functions (tasks) performed by the Information System</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the functions (tasks) performed by the System for recording and monitoring the activities of SOEs.</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The information system for accounting and monitoring the activities of SOEs will be designated from the following subsystems:</p>\n\n<ul>\n\t<li>Data visualization subsystem</li>\n\t<li>Subsystem for allocating roles and access rights&nbsp;\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the functions (tasks) performed by the data visualization subsystem</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ul>\n\n<p><strong>Data visualization subsystem&nbsp;</strong>- designed to organize data presentation based on the data structure and develop the system user interface, including the development of data entry and display forms, reports and their printable forms, visualization tools for data samples in the form of diagrams and graphs.&nbsp;The subsystem should perform the following functions:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:95.3pt\">\n\t\t\t<p>Function</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<p>Task</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>The form</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Grouping data in different sections defined by the data hierarchy down to the lowest level of detail;</li>\n\t\t\t\t<li>Grouping data from different levels of the hierarchy;</li>\n\t\t\t\t<li>Creation and saving of fixed groupings of data available in subsequent sessions of work with the system after the completion of the current one;</li>\n\t\t\t\t<li>Creation of templates defining the sequential steps of the analysis with the support of the interactive mode;</li>\n\t\t\t\t<li>Ranking, sorting and filtering by various categories and indicators;</li>\n\t\t\t\t<li>Creation of multi-section reports with different levels of data grouping;</li>\n\t\t\t\t<li>Creation of a set of standard report templates that make it easier for the user to build standard reports;</li>\n\t\t\t\t<li>Setting the parameters of reports in the interactive mode;</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>Analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Flexible data manipulation;</li>\n\t\t\t\t<li>Data scaling (drill-down);</li>\n\t\t\t\t<li>Possibilities of data aggregation by arbitrary indicators;</li>\n\t\t\t\t<li>Support for the ability to display monetary amounts in more than one currency with the ability to quickly recalculate;</li>\n\t\t\t\t<li>Ranking values ​​of measurement categories by values ​​of indicators;</li>\n\t\t\t\t<li>Analysis of trends over time;</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>Performance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Pie charts;</li>\n\t\t\t\t<li>Column charts are two-dimensional;</li>\n\t\t\t\t<li>Column charts are three-dimensional;</li>\n\t\t\t\t<li>Line charts;</li>\n\t\t\t\t<li>Scatter plots;</li>\n\t\t\t\t<li>Simultaneous output of data in tabular and graphical form;</li>\n\t\t\t\t<li>Formation of balanced and unbalanced nested pivot tables;</li>\n\t\t\t\t<li>Calculations over the values ​​of indicators for arbitrary groups of measurement categories;</li>\n\t\t\t\t<li>Conditional formatting of indicators depending on their values;</li>\n\t\t\t\t<li>Displaying indicators in the form of absolute values ​​and shares of total values;</li>\n\t\t\t\t<li>Export of slices of multidimensional cubes in various formats.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>The data visualization subsystem should be able to generate the following reporting groups:</p>\n\n<ul>\n\t<li>Reporting forms in accordance with NAS, which includes 4 reporting forms (the list is given in Table 4.2.1.);</li>\n\t<li>Reporting forms for key performance indicators (manufacturing enterprises, banking sector, insurance companies), which includes 18 reporting forms (the list is given in Table 4.2.2.);</li>\n\t<li>Reporting form for the implementation of the business plan, which includes 15 forms (the list is given in Table 4.2.3.);</li>\n\t<li>Management reporting form, which includes 15 forms (the list is given in Table 4.2.4.);</li>\n\t<li>Forms of reporting under IFRS for both industrial and financial and banking sectors, including 9 forms (a preliminary list is given in Table 4.2.5.);</li>\n</ul>\n\n<p>The methodological component of the reporting forms, with the exception of the IFRS reporting form and its disclosure, is provided by the Agencyat the Design stage.</p>\n\n<p>Initially, the reporting forms in accordance with IFRS (enterprises and the financial and banking sector) will be filled out through the information portal kpi.davaktiv.uz by enterprises on the basis of their own calculations.</p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>List of reporting forms:</strong></p>\n\n<p><strong>Table 4.2.1 -&nbsp;</strong>Forms of reporting in accordance with NAS</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>Form No. 1 - balance sheet</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Long-term assets</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Current assets</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Sources of own funds</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Commitments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Certificate of availability of valuables recorded on off-balance sheet accounts</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Deciphering overdue receivables and payables - overdue receivables</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:10.45pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Overdue payables</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; width:449.6pt\">\n\t\t\t<p>Form No. 2 - Statement of financial results</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Form -2</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; width:449.6pt\">\n\t\t\t<p>Form No. 4 - statement of cash flows</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Operating activities</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Investment activities</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Financial activities</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Taxation</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Statement of cash flow in foreign currency</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; width:449.6pt\">\n\t\t\t<p>Form No. 5 - statement of equity capital</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:10.45pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:428.35pt\">\n\t\t\t<p>Form No. 5</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Table 4.2.2 - Forms of reporting on key performance indicators.</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>Key Performance Indicators - Industrial</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>List of key KPIs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>List of additional key performance indicators</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; width:449.6pt\">\n\t\t\t<p>Key performance indicators - banking sector</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Indicators of assets and liabilities</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Compliance with normative indicators in the bank</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Financial performance</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Trust Fund Tax and Payments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Distribution of net profit</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>External credit lines / Eurobonds</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Sponsorship</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Amount of workers</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; width:449.6pt\">\n\t\t\t<p>Key performance indicators - insurance companies</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Indicators of assets and liabilities</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Compliance with normative indicators</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Financial performance</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Trust Fund Tax and Payments</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Distribution of net profit</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>External debt</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Sponsorship</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Amount of workers</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Table 4.2.3- Reporting forms - business plan</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>Business plan</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Production facilities (works and services)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Production volume (Works and services)</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Financial performance</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Taxes and payments to trust funds</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Distribution of net profit</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Debentures</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>External debt</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Foreign trade and foreign economic activity of the enterprise.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Important performance indicators</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Production of products included in the localization program</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Investment projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Sponsorship</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>The number of employees</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Management and control bodies of SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Changes in the composition of the supervisory board, the executive body of the audit commission.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Table 4.2.4 - Management reporting forms</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>Management reporting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Information on the production indicators of enterprises</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Production indicators</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Financial performance</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>About business plans of SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>On the state of the analysis of the activities of SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Payment of dividends by SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>According to the results of 9 months of the reporting year, state enterprises operating in the territory of the republic.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Financial recovery of SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Information about the labor resources of enterprises</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Production of products included in the localization program</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Investment projects.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Sponsorship</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>The number of employees</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Management and control bodies of SOEs</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Changes in the composition of the supervisory board, the executive body of the audit commission.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>&nbsp;</strong></p>\n\n<p><strong>Table 4.2.5 - Preliminary reporting forms in accordance with IFRS</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>Preliminary IFRS reporting forms - enterprises</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of financial position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of comprehensive income</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of changes in equity</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Cash flow statement (direct method)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#deebf6; border-color:black; width:449.6pt\">\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Preliminary reporting forms under IFRS - (financial and banking sector)</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of financial position</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of comprehensive income</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Profit or loss statement</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Statement of changes in equity</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:24.65pt\">\n\t\t\t<ol>\n\t\t\t\t<li>&nbsp;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:414.15pt\">\n\t\t\t<p>Cash flow statement</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>At the same time, the tools of the business analysis system should allow generating reports in a graphical form with various levels of complexity.&nbsp;Below is the graphic design of this kind of reporting (dashboards, graphs, diagrams, territorial dashboards, etc.).</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>p. 4.2.1 &ndash; Example of visualization of predictive analysis</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>p. 4.2.1 &ndash; </em><em>An example of visualization of a territorial dashboard</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>p. 4.2.1 &ndash; An example of KPI visualization</em></p>\n\n<p>Time schedule for the implementation of each function, tasks:</p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:152.0pt\">\n\t\t\t<p>Interim regulation requirements</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Task</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"19\" style=\"height:34.35pt; width:152.0pt\">\n\t\t\t<p>The entire period of operation of the system upon user initiation</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:34.35pt; vertical-align:top; width:314.9pt\">\n\t\t\t<p>Grouping data in different sections defined by the data hierarchy down to the lowest level of detail;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:314.9pt\">\n\t\t\t<p>Grouping data from different levels of the hierarchy;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Creation and saving of fixed groupings of data available in subsequent sessions of work with the system after the completion of the current one;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Creation of templates defining the sequential steps of the analysis with the support of the interactive mode;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Ranking, sorting and filtering by various categories and indicators;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Creation of multi-section reports with different levels of data grouping;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Ranking values ​​of measurement categories by values ​​of indicators;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Analysis of trends over time;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:12.8pt; vertical-align:top; width:314.9pt\">\n\t\t\t<p>Pie charts;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Column charts are two-dimensional;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Column charts are three-dimensional;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Line charts;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Scatter plots;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Simultaneous output of data in tabular and graphical form;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Formation of balanced and unbalanced nested pivot tables;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Calculations over the values ​​of indicators for arbitrary groups of measurement categories;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Conditional formatting of indicators depending on their values;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Displaying indicators in the form of absolute values ​​and shares of total values;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Export of slices of multidimensional cubes in various formats.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"5\" style=\"width:152.0pt\">\n\t\t\t<p>The entire period of operation of the system</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Creation of a set of standard report templates that make it easier for the user to build standard reports;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Setting the parameters of reports in the interactive mode;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Flexible data manipulation;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:314.9pt\">\n\t\t\t<p>Data scaling (drill-down);</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:41.9pt; vertical-align:top; width:314.9pt\">\n\t\t\t<p>Possibilities of data aggregation by arbitrary indicators;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Requirements for the quality of implementation of functions, tasks.</strong></p>\n\n<p>All functions and tasks must have a characteristic of accuracy and execution time, determined by the operating regulations.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>List of failure criteria for each function:</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:81.9pt\">\n\t\t\t<p>Function</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:133.9pt\">\n\t\t\t<p>Refusal criteria</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:132.25pt\">\n\t\t\t<p>Recovery time</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:97.25pt\">\n\t\t\t<p>Availability ratio</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:81.9pt\">\n\t\t\t<p>The form</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:133.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:132.25pt\">\n\t\t\t<p>8 ocloc&#39;k</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:97.25pt\">\n\t\t\t<p>0.85</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:81.9pt\">\n\t\t\t<p>Analysis</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:133.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:132.25pt\">\n\t\t\t<p>12 hours</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:97.25pt\">\n\t\t\t<p>0.75</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:81.9pt\">\n\t\t\t<p>Performance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:133.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:132.25pt\">\n\t\t\t<p>12 hours</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:97.25pt\">\n\t\t\t<p>0.75</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li>\n\t\t\t<ol>\n\t\t\t\t<li><strong>Requirements for the functions (tasks) performed by the subsystem for allocating roles and access rights.</strong></li>\n\t\t\t</ol>\n\t\t\t</li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The subsystem of distribution of roles and access rights is designed to provide the following functions:</p>\n\n<p>The subsystem should perform the following functions:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:95.3pt\">\n\t\t\t<p>Function</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<p>Task</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>User management and monitoring</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>User management;</li>\n\t\t\t\t<li>Provision of work on replacing versions of the client and server parts of the software product, setting the parameters of the client and server parts of the software product;</li>\n\t\t\t\t<li>Provision of routine maintenance provided for by the operational documentation for the software product;</li>\n\t\t\t\t<li>Resolution of problems arising during the operation of the software product;</li>\n\t\t\t\t<li>Elimination of emergency situations (incidents) arising during the operation of the software product;</li>\n\t\t\t\t<li>Elimination of the consequences of known (identified during operation, but not eliminated) errors of the software product associated with the operation of the software product;</li>\n\t\t\t\t<li>Monitoring the work of users of the software product and means for interacting with them;</li>\n\t\t\t\t<li>Monitoring of the parameters of the functioning of the software product;</li>\n\t\t\t\t<li>Procedures for managing the operation of a software product;</li>\n\t\t\t\t<li>Removal of users from the software product should be carried out by transferring them to the category of blocked users without the possibility of performing operations under their names and without the possibility of canceling this status;</li>\n\t\t\t\t<li>The possibility of deleting information about users registered in the software product, including blocked ones, must be excluded;</li>\n\t\t\t\t<li>The possibility of changing (modifying) demo data (last name, first name, patronymic) of the established users must be excluded;</li>\n\t\t\t\t<li>The implementation of the administration mechanism should not reveal the logic of building the database of the software product;</li>\n\t\t\t\t<li>Users who do not have business roles (Administrator, Operator, etc.) should not be able to change the business data of the software product.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>Access rights management</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>The mechanism for distributing access rights to the functions of a software product should allow the provision of users with the minimum rights necessary to perform their functional duties;</li>\n\t\t\t\t<li>The architecture and construction of the database must be such that the rights of users in the database do not exceed the rights of users in the application part of the software product;</li>\n\t\t\t\t<li>The mechanism for distributing access rights should cover all user operations with objects of the software product.&nbsp;All objects of the software product and operations on them must be covered by the mechanism for distributing access rights;</li>\n\t\t\t\t<li>The mechanism for differentiating access rights should be implemented based on the creation of roles in a database or application part of a software product.&nbsp;Access to objects of the software product must be explicitly allowed or denied based on the user&#39;s security attributes;</li>\n\t\t\t\t<li>The mechanism for differentiating access rights should ensure that the employee can launch only the functions allowed to him.</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:95.3pt\">\n\t\t\t<p>Identification and authentication mechanisms</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:371.6pt\">\n\t\t\t<ul>\n\t\t\t\t<li>Access to information and functions of the software product should be provided to the user only after the presentation of a unique personalized identifier (name) of the user and an authentication procedure based on some information entered by the user (password, keys);</li>\n\t\t\t\t<li>It should be possible to determine the authorship of each operation in the software product and the absence of unauthorized operations based on the unique&nbsp;personalized identifiers of each user, the authentication procedure and logging of user actions in audit logs.&nbsp;&nbsp;</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>The time schedule for the&nbsp;</strong>implementation of each function, task is determined for the entire period of the system&#39;s operation.</p>\n\n<p><strong>Requirements for the quality of implementation of functions, tasks.</strong></p>\n\n<p>All functions and tasks must have a characteristic of accuracy and execution time, determined by the operating regulations.</p>\n\n<p><strong>List of failure criteria for each function:</strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:102.35pt\">\n\t\t\t<p>Function</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:114.9pt\">\n\t\t\t<p>Refusal criteria</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:131.3pt\">\n\t\t\t<p>Recovery time</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:96.75pt\">\n\t\t\t<p>Availability ratio</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:102.35pt\">\n\t\t\t<p>User management and monitoring</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:114.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:131.3pt\">\n\t\t\t<p>12 hours</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:96.75pt\">\n\t\t\t<p>0.75</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:102.35pt\">\n\t\t\t<p>Access rights management</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:114.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:131.3pt\">\n\t\t\t<p>12 hours</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:96.75pt\">\n\t\t\t<p>0.75</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:102.35pt\">\n\t\t\t<p>Identification and authentication mechanisms</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:114.9pt\">\n\t\t\t<p>One of the tasks of the function is not being performed.</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:131.3pt\">\n\t\t\t<p>8 ocloc&#39;k</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:96.75pt\">\n\t\t\t<p>0.85</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Connecting</strong><strong> </strong><strong>of source systems</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n\t<li>The Agencyundertakes to ensure interaction with related departments and projects, including interaction with source systems, to the extent necessary for the implementation of the project;</li>\n\t<li>The Agencyundertakes to provide access to all available up-to-date documentation on the source systems and to allocate competent specialists for consultations and approvals of the technical documentation of the project (TOR for uploading data, regulations for interaction with the source, etc.) in the amount necessary for the implementation of the project;</li>\n\t<li>The Agencyundertakes to provide the Supplier with access to the productive and test environments of the source systems with up-to-date data and structures, organized on the basis of the Agencys equipment, corresponding in performance to the configuration of the database server environment at the appropriate stage of development;</li>\n</ul>\n\n<p>The sources with which the integration is performed satisfy the following assumptions:</p>\n\n<ul>\n\t<li>All connected Sources have a data availability schedule for a specific date;</li>\n\t<li>Technological windows on the Sources and data transmission channels ensure the possibility of regular data uploading in accordance with the operating regulations of the reporting system;</li>\n\t<li>The Supplier develops a logical data model taking into account the business requirements of the Agency, defining the requirements for interfaces on the side of source systems (specification of interface objects);</li>\n\t<li>The granularity of the data and the set of attributes (Indicators, Dimensions) are determined by the business reporting requirements agreed at the stage of business analysis;</li>\n\t<li>The project does not envisage the implementation of special algorithms for uploading data via slow and unreliable communication channels;&nbsp;it is assumed that the System and the Sources are within the same high-speed local network with a guaranteed bandwidth of at least 100 Mbps (a network failure may lead to a download failure);</li>\n\t<li>It is assumed that sufficient hardware capacities will be used in accordance with the specifications calculated at the stage of forming the requirements for equipment;</li>\n\t<li>The quality of the data uploaded to the System corresponds to the quality of the data of the source systems;</li>\n\t<li>The Supplier implements control mechanisms, regulations for informing and reporting, allowing to track the compliance of data in the System and source systems.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Requirements to types of support</strong>\n\n\t\t<ol>\n\t\t\t<li><strong>Requirements for software</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The software of the System must ensure the implementation of the functions listed in this TT, as well as the performance of configuration, programming, database management and documentation operations.&nbsp;The system must ensure the implementation of the required algorithms for control, regulation and protection, information display, signaling and data archiving.</p>\n\n<p>The software of the System should include:</p>\n\n<p>Typical and developed methods and algorithms for collecting and processing information (including data entry into a PC, data reliability control, etc.);</p>\n\n<ul>\n\t<li>Data search and sorting algorithms;</li>\n\t<li>General requirements for software;</li>\n\t<li>Using the standard class library;</li>\n\t<li>Maximum use of standard methods and algorithms;</li>\n\t<li>The mathematical methods used must take into account the technical capabilities of hardware and software, have the minimum values ​​of the solution time and the occupied RAM;</li>\n\t<li>Documentation for software (problem statement and solution algorithms) should provide unambiguous interpretation and programming capability without additional clarifications;</li>\n\t<li>Any form of task description is allowed - formulaic, tabular, flowchart, UML diagram, verbal description, etc.</li>\n</ul>\n\n<p>Software algorithms must meet the following requirements:</p>\n\n<ul>\n\t<li>Allow decomposition into relatively simple blocks;</li>\n\t<li>Make the most of the capabilities of programming languages ​​in your description;</li>\n\t<li>Provide functional interconnection of tasks.</li>\n</ul>\n\n<p>Algorithms for searching and sorting data used in solving almost all functional problems of the System should be based on procedures in the system software and used in the System.&nbsp;These algorithms should ensure the search for information by the specified values ​​of the features, the formation of the specified information structures and the performance of the necessary operations on them.&nbsp;</p>\n\n<p>Algorithms for generating output documents should be as unified as possible, allow, if necessary, to quickly change the forms of documents and use standard procedures and software.</p>\n\n<p>Algorithms for solving problems, if necessary, can include optimization methods and heuristic procedures for specific problems.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Information support requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Information support should be sufficient to perform all automated functions of the System.</p>\n\n<p>The information support of the System should be a collection of data and data management tools, which are designed for integrated information processing and software solution of functional tasks.</p>\n\n<ul>\n\t<li>Compatibility with the information support of the Systems interacting with the systems being implemented must be ensured;</li>\n\t<li>Forms of documents must meet the requirements of the corporate standards of the Agency (or a unified documentation system);</li>\n\t<li>The structure of documents and screens should correspond to the characteristics of the terminals at the end-user workplaces;</li>\n\t<li>Formation schedules and content of information messages, as well as the abbreviations used must be generally accepted in this subject area and agreed with the Agency;</li>\n\t<li>Access to data should be provided only to authorized users, taking into account their official powers, as well as taking into account the category of the requested information;</li>\n\t<li>It is necessary to provide for the possibility of emergency disconnection of access to the systems being implemented in cases of emergency situations.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for information exchange between system components</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The software and hardware of the components of the information system being implemented must comply with the data exchange standards using the TCP / IP protocol stack.</p>\n\n<p>Information exchange between software components of subsystems should be carried out using standard protocols and technologies: web-services, JMS messaging, HTTP / HTTPS, EJB, file transfer (FTP, SFTP), LDAP, JDBC, etc.</p>\n\n<p>Information exchange between the software components of the subsystems and the browser should be carried out using the HTTP / HTTPS protocols.</p>\n\n<p>The software and hardware that ensure the interaction of the System with the users of the System must support the current versions of the following browsers supported by the manufacturer:</p>\n\n<ul>\n\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Mozilla Firefox - current version and current ESR version;</li>\n\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Google Chrome - current version;</li>\n\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Opera - current version;</li>\n\t<li>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Microsoft Internet Explorer - current version (Desktop);</li>\n</ul>\n\n<p>At the time of the start of commercial operation of the System, consider the versions available for download on the download pages of the official websites of browser manufacturers as the current supported versions of browsers.</p>\n\n<p>For browsers that support two ways of browsing the web, a touch-optimized Windows user interface, and a familiar touch-based interface, the latter should be supported.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Linguistic requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The linguistic support of the System, whenever possible, should provide for the use of a single logical and conceptual interface for users and designers.&nbsp;Including:</p>\n\n<ul>\n\t<li>Linguistic support should be sufficient for communication of various categories of users in a convenient form with automation tools and for carrying out transformation procedures and machine representation of information processed in the System;</li>\n\t<li>During the development and design of the System, tools should be used that include a complete set of tools for end-to-end design;</li>\n\t<li>The system must use high-level programming languages ​​(such as: C ++, C #, Delphi, Fortran, Java, JavaScript, Pascal, PHP, Ruby, Python, Perl), including for the data input / output process;</li>\n\t<li>A structured query language, such as SQL, must be used to manipulate data;</li>\n\t<li>The implementation of the System should be based on modern information technologies, as in the implementation of subject-oriented applied software systems that automate the execution of individual applied procedures and operations at all levels of the organizational hierarchy, a single information space based on a databank.</li>\n</ul>\n\n<p>The information in the database must be stored in the language in which it was entered into it.&nbsp;The choice of the current data input language for the database depends on the current legislative acts of the Republic of Uzbekistan and must support input in Uzbek and Russian.</p>\n\n<p>Application software development should be carried out in high-level languages.&nbsp;Users must interact with the system at the graphical user interface level.</p>\n\n<p>All functions of the system, prior to their full implementation into industrial operation, must provide a Russian-language user interface.</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Software Requirements</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n\t<li>When implementing the system, advanced industry technologies from leading manufacturers should be used.</li>\n\t<li>Use as the main technology for placing data &quot;in-memory&quot;.</li>\n\t<li>All tools supplied as part of the software (software) must have certificates, as well as license agreements (licenses) confirming the legality of their use.</li>\n\t<li>The software must be supplied with sets of licenses corresponding to the number of workstations on which it is supposed to be installed, and have the latest version of the manufacturer in terms of release time.&nbsp;</li>\n</ul>\n\n<p>The System software must have the following characteristics:</p>\n\n<ul>\n\t<li>Provide resilience to erroneous situations, including incorrect and inconsistent data;&nbsp;failures in the operation of programs, failures of part of the computing facilities, personnel errors should be diagnosed, accompanied by messages, and should not cause disturbances in the operation of the system;</li>\n\t<li>Provide a restart when the electric power is restored after it is turned off without generating false signals and control actions;</li>\n\t<li>Give correct results for all combinations of initial data that are admissible within the framework of the problem statement;</li>\n\t<li>Be able to quickly configure during the operation of the System.</li>\n</ul>\n\n<p>If the software manufacturer does not have technical documentation in the state (Uzbek) language, the translation of the technical documentation into the state language is carried out by the Agency.</p>\n\n<p>All software must be guaranteed for at least 1 year.</p>\n\n<p>The systems should be able to interact with leading foreign IT systems:</p>\n\n<ul>\n\t<li>Database level: Oracle, DB / 2, MS SQL, PostgreSQL, SAP Hana, HP Vertica, etc.</li>\n\t<li>BI level: Oracle BI, SAS BI, SAP BO, QilckView, IBM Cognos, etc .;</li>\n\t<li>Business logic layer: Oracle OFSAA, SAS DDS, SAP FSDP, Sybase DDS, IBM BDW, etc .;</li>\n\t<li>Information on the compatibility of the versions of the proposed software should be provided.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for metrological support</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The composition of information, control functions of the system, measured parameters of the control object, their exact characteristics, metrological characteristics will be determined and agreed upon during the implementation of the project stage &ldquo;Formation of requirements for the system&rdquo;.</p>\n\n<p>Metrological compatibility of the technical means of the system is ensured through the choice of compatible technical means by the developer.</p>\n\n<p>There are no additional requirements for metrological support.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for technical support</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>There are no requirements for the existing technical support.</p>\n\n<p>The optimal requirements for technical support for the proposed software product should be indicated in the technical proposal by the participants in the procurement procedure.</p>\n\n<p>The hardware, standard software, and network equipment for the implementation of the project are provided by the Agency</p>\n\n<p>In the process of developing and deploying an analytical reporting system, a test and production environment is required. These should be independent servers used for testing, training and deploying the system.&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for methodological support</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The calculation methods used in solving system problems, as well as, if necessary, other specific requirements for the implementation of tasks, are detailed by the Supplier based on the results of a preliminary survey of the Agency&#39;s IT structure and are agreed with the Agency.</p>\n\n<p>Systems should be implemented on the basis of current regulatory legal acts and organizational and administrative documents.</p>\n\n<p>Methods and instructions for performing operations in the Systems by users must be developed and approved in the prescribed manner.</p>\n\n<p>The methodological support includes:</p>\n\n<ul>\n\t<li>Regulatory legal documents;</li>\n\t<li>Job descriptions of personnel performing work using the System.</li>\n</ul>\n\n<p>The composition of the methodological support can be specified in the process of technical and detailed design and is agreed with the Agency.</p>\n\n<p>Normative and technical documentation must comply with the requirements of regulatory legal acts and be developed in accordance with the following standards:</p>\n\n<ul>\n\t<li>O&#39;z DSt 1986: 2018 State standard of Uzbekistan Information technology.&nbsp;Information Systems.&nbsp;Stages of creation;</li>\n\t<li>O&#39;z DSt 1987: 2018 State standard of Uzbekistan &ldquo;Information technology.&nbsp;Terms of Reference for the Creation of an Information System &quot;;</li>\n\t<li>O&#39;z DSt 1985: 2018 Types, completeness and designation of documents when creating an information system (IS);</li>\n\t<li>O&#39;z DSt 3243: 2017 Information technology.&nbsp;Local and corporate</li>\n\t<li>T 45-194: 2007 Recommendations on the use of software and hardware to prevent acts of illegal entry into information systems.\n\t<ol>\n\t\t<li>\n\t\t<ol>\n\t\t\t<li><strong>Requirements for the scope and / or duration of guarantees</strong></li>\n\t\t</ol>\n\t\t</li>\n\t</ol>\n\t</li>\n</ul>\n\n<p>The Supplier assumes obligations for quality assurance results obtained during the performance of work. The minimum period for providing a quality guarantee for work is 12 months plus 1 working day from the date of acceptance of the results of work by the Agency (the date of the signing by the Agencyof the Certificate of Acceptance of Works).</p>\n\n<p>The Supplier is responsible for defects and deficiencies found during the warranty period. In case of revealing defects and deficiencies during the warranty period, the Supplier performs work to eliminate them free of charge, including if during operation it is revealed that the System does not correspond to the purpose indicators declared in its Private Terms of Reference and / or Technical Design. The deadline for eliminating defects and deficiencies is established by agreement between the Agencyand the Supplier, but should not exceed one month.</p>\n\n<ol>\n\t<li><strong>SCOPE AND CONTENT OF THE SYSTEM IMPLEMENTATION WORKS</strong><strong> </strong></li>\n</ol>\n\n<p>The implementation of the requirements of this TT should be carried out in several stages.&nbsp;The composition and content of the work by stages is shown in the table below.&nbsp;The list of stages and stages of the work performed on the implementation of the automated system is indicated in accordance with O&#39;zDSt 1986: 2018 Information technology.&nbsp;Information Systems.&nbsp;Stages of creation.</p>\n\n<p>Preliminary stages of work (table 5.1):</p>\n\n<p>&nbsp;</p>\n\n<p><strong>List of stages and stages of work on the creation of the System</strong></p>\n\n<p><strong>&nbsp;</strong></p>\n\n<table cellspacing=\"0\" style=\"width:489.55pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#0070c0; width:31.5pt\">\n\t\t\t<p>Stage number</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#0070c0; width:130.95pt\">\n\t\t\t<p>Name of works and their content</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#0070c0; width:102.6pt\">\n\t\t\t<p>Deadline</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#0070c0; width:67.15pt\">\n\t\t\t<p>Supplier (organization)</p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#0070c0; width:102.6pt\">\n\t\t\t<p>How the stage ends</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#0070c0; width:45.9pt\">\n\t\t\t<p>Start</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#0070c0; width:45.9pt\">\n\t\t\t<p>The ending</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>Formation of requirements for the System:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Initial survey of the facility and justification of the need for the System;</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>October 2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>November</p>\n\n\t\t\t<p>2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:67.15pt\">\n\t\t\t<p>Executor</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>Site survey report;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>System concept development:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Development of the project charter;</li>\n\t\t\t\t<li>Pre-design survey;</li>\n\t\t\t\t<li>Formation of business requirements for the system.</li>\n\t\t\t\t<li>Formation of a report on the results of work.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>November</p>\n\n\t\t\t<p>2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>December 2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<ol>\n\t\t\t\t<li>Project charter;</li>\n\t\t\t\t<li>Project schedule;</li>\n\t\t\t\t<li>Report on the results of the work.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>Technical task:</p>\n\n\t\t\t<p>Drawing up the Terms of Reference for the creation of the system and its form</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>December2024</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>January2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>Terms of reference for data marts in terms of the received reporting on:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>National accounting standards (NAS);</li>\n\t\t\t\t<li>KPI;</li>\n\t\t\t\t<li>Implementation of the business plan, production indicators, personnel report;</li>\n\t\t\t\t<li>Management reporting;</li>\n\t\t\t\t<li>IFRS</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>Design:</p>\n\n\t\t\t<p>1. Development of design solutions for the system and its parts.&nbsp;Testing;</p>\n\n\t\t\t<p>2. Development of documentation for the System and its parts;</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>February2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>August2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>Development specifications, data mappings in terms of the received reporting on:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>NAS;</li>\n\t\t\t\t<li>KPI;</li>\n\t\t\t\t<li>Implementation of the business plan, production indicators, personnel report;</li>\n\t\t\t\t<li>Management reporting;</li>\n\t\t\t\t<li>IFRS</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>Working documentation:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Development of working documentation for the system and its parts.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>August2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>September 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p>Working documentation for the development of reporting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>Commissioning:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Preparation of the automation object for putting the System into operation;</li>\n\t\t\t\t<li>Personnel training;</li>\n\t\t\t\t<li>Commissioning works:</li>\n\t\t\t\t<li>Setting up integration with systems in accordance with the TOR;</li>\n\t\t\t\t<li>Preliminary tests;</li>\n\t\t\t\t<li>Coordination of improvements and settings, correction of defects;</li>\n\t\t\t\t<li>Acceptance tests.&nbsp;&nbsp;</li>\n\t\t\t\t<li>Pilot industrial operation</li>\n\t\t\t\t<li>Industrial exploitation</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>September 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>October 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p><strong>Reporting&nbsp;</strong>on:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>NAS</li>\n\t\t\t\t<li>KPI</li>\n\t\t\t\t<li>Implementation of the business plan, performance indicators, personnel;</li>\n\t\t\t\t<li>Management reporting</li>\n\t\t\t\t<li>IFRS</li>\n\t\t\t</ol>\n\n\t\t\t<p><strong>Guides&nbsp;</strong>:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Business Analysis System User Guide</li>\n\t\t\t\t<li>Business Analysis System Administrator Guide</li>\n\t\t\t\t<li>Acceptance test procedure</li>\n\t\t\t\t<li>Acceptance test report</li>\n\t\t\t</ol>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:31.5pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:130.95pt\">\n\t\t\t<p>System Maintenance:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Performance of work in accordance with warranty obligations;</li>\n\t\t\t\t<li>Post-warranty service.</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>November 2025</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:45.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.15pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:102.6pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;5.1 Preliminary stages of work.</em></p>\n\n<p>&nbsp;</p>\n\n<p>Preliminary work schedule (table 5.2):</p>\n\n<table cellspacing=\"0\" style=\"width:838px\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#2f5496; width:20.65pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:113.9pt\">\n\t\t\t<p>Year</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"18\" style=\"background-color:#2f5496; width:366.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td>\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:20.65pt\">\n\t\t\t<p>№</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:113.9pt\">\n\t\t\t<p>Stage</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:19.9pt\">\n\t\t\t<p>10.24</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:15.7pt\">\n\t\t\t<p>11.24</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:17.85pt\">\n\t\t\t<p>12.24</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.45pt\">\n\t\t\t<p>01.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.45pt\">\n\t\t\t<p>02.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:18.0pt\">\n\t\t\t<p>03.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:20.45pt\">\n\t\t\t<p>04.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:25.85pt\">\n\t\t\t<p>05.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.45pt\">\n\t\t\t<p>06.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.45pt\">\n\t\t\t<p>07.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.45pt\">\n\t\t\t<p>08.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:25.5pt\">\n\t\t\t<p>09.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.25pt\">\n\t\t\t<p>10.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:26.6pt\">\n\t\t\t<p>11.25</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d5dce4; height:34.0pt; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#d5dce4; height:34.0pt; width:21.55pt\">\n\t\t\t<p>11.26</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>Formation of requirements for the System</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>System concept development</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:20.65pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; width:113.9pt\">\n\t\t\t<p>Technical task</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; height:11.75pt; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:11.75pt; vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:11.75pt; vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>Design</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#0070c0; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#2f5496; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>Working documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#0070c0; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>Commissioning</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#0070c0; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:26.6pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:11.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.4pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"vertical-align:top; width:21.55pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:20.65pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:113.9pt\">\n\t\t\t<p>System Maintenance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:19.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.7pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:17.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:18.0pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:20.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.85pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.45pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:25.5pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:21.25pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"6\" style=\"background-color:#0070c0; width:96.7pt\">\n\t\t\t<p>Within 12 months</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><em>Tab.&nbsp;5.2 Preliminary work schedule.</em></p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>SYSTEM CONTROL AND ACCEPTANCE PROCEDURE</strong></li>\n</ol>\n\n<p>Control and acceptance of the System must be carried out in accordance with the requirements of O&#39;zDSt 1986: 2018 Information technology.&nbsp;Information Systems.&nbsp;Stages of creation.</p>\n\n<p>Both the System as a whole and its individual stages (launch complexes), subsystems and individual tasks can be subject to control, testing and acceptance.</p>\n\n<p>The following main types of tests are established for the System:</p>\n\n<ul>\n\t<li>Preliminary tests;</li>\n\t<li>Acceptance tests;</li>\n\t<li>Pilot industrial operation;</li>\n\t<li>Industrial exploitation</li>\n</ul>\n\n<p>Conducting test tests must be carried out on a test environment. Pilot and operational work - on a productive environment.</p>\n\n<p>To plan the conduct of all types of tests, the documents &quot;Program and Test Methodology&quot; of the corresponding types of tests are being developed, which must establish the necessary and sufficient scope<br />\nand timing of tests to ensure the specified reliability of the results obtained.&nbsp;The test program and methodology can be developed<br />\nfor the System as a whole and (or) its parts.&nbsp;Tests (test cases) can be included as an attachment.</p>\n\n<p>When testing the System, compliance with the Terms of Reference (TOR) for the creation of the System should be checked and established as follows:</p>\n\n<ul>\n\t<li>The quality of performing automated functions by the complex of software and hardware in all modes of the System&#39;s operation;</li>\n\t<li>Completeness of the instructions to the personnel contained in the operational documentation on the performance of their functions in all modes of the System&#39;s operation;</li>\n\t<li>Quantitative and (or) qualitative characteristics of the performance of automatic and automated functions of the System;</li>\n\t<li>Other properties of the System, which it must comply with according to the requirements of the Terms of Reference.</li>\n</ul>\n\n<p>System tests are carried out at the Agency&#39;s site.&nbsp;By agreement between the Agencyand the Supplier, preliminary tests and acceptance of the System software may be carried out on the Supplier&#39;s technical means when conditions are created for obtaining reliable test results.</p>\n\n<p>The status and composition of the acceptance committee is determined by the Agency.</p>\n\n<p>Based on the test results, protocols are drawn up with a list of comments and acts of completion of tests, on the basis of which a decision is made on the possibility (or impossibility) of transition to the next type of test or acceptance of the System into permanent operation.&nbsp;The types of tests can be repeated until all comments to the System are eliminated and the operational documentation is corrected accordingly.</p>\n\n<p>Tests of the System are performed after debugging<br />\nand testing of the supplied software and hardware of the System<br />\nand the submission by the Supplier of the relevant documents about their readiness for testing, as well as after familiarization of the Agency&#39;s technical specialists with the operational documentation of the System.</p>\n\n<p>In the process of operation and testing, the readiness of individual parts, complexes and tasks of the System, as well as the presented documentation, is checked for operation in real conditions.&nbsp;Operation of the System and its parts begins from the moment of approval of the acceptance certificate for operation.</p>\n\n<p>Additional requirements of the Agencyarising in the process of preliminary tests and operation, which are not provided for in the terms of reference, are not grounds for a negative assessment of the results of operation and testing.&nbsp;They can be satisfied by an additional agreement within an agreed time frame.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Types, scope and test methods</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>At the first stage, the check should be carried out in accordance with the program<br />\nand methodology for preliminary tests of the experimental segment, developed by the Supplier and approved by the Agency.</p>\n\n<p>At the stage of trial operation of the experimental segment, an assessment of the completeness of the adopted design decisions should be made, and requirements for revision to a standard replicated solution can be formulated.</p>\n\n<p>After completing the modifications, in accordance with the addendum to the TT, a program and methodology for acceptance tests should be developed.</p>\n\n<p><strong>Preliminary tests</strong></p>\n\n<p>Preliminary tests of the System are carried out to determine its operability and to resolve the issue of the possibility of transferring the System into operation.</p>\n\n<p>Preliminary tests are carried out at a specially equipped stand.</p>\n\n<p><strong>Pilot industrial operation</strong></p>\n\n<p>Pilot industrial operation of the System is carried out to determine the correctness of the design decisions and the constructed information model, to determine the degree of compliance of the System functionality with the users&#39; requirements and the degree of convenience of working with the user graphical interface.</p>\n\n<p>Operations management works include:</p>\n\n<ul>\n\t<li>Determination of the Agency&#39;s divisions in which the operation will be carried out;</li>\n\t<li>Determination of the responsible persons of the Agencyfor the operation;</li>\n\t<li>Determination of the Agency&#39;s employees involved in the operation;</li>\n\t<li>Determination of preliminary requirements for paper forms of accounting and reporting documentation and approval of temporary regulations for keeping records in organizations participating in the operation;</li>\n\t<li>Deployment of the System;</li>\n\t<li>Consultation of the Agency&#39;s employees on the rules of working with the System.</li>\n</ul>\n\n<p>During the operation of the System, a work log is kept in which information is entered on the duration of operation, failures, failures, emergency situations, changes in the parameters of the modernization object, corrections of documentation and software, adjustment of technical means.&nbsp;The information is recorded in the journal with the date and the person in charge.&nbsp;The journal may contain staff comments on the convenience of the System operation.</p>\n\n<p>Information entered into the System at the stage of test operation must be deleted from the data warehouse during the transition to the stage of operation and cannot be used to generate any official reporting forms.</p>\n\n<p><strong>Acceptance tests</strong></p>\n\n<p>Acceptance tests are carried out in accordance with the program and methodology of acceptance tests, which indicate:</p>\n\n<p>list and completeness of acceptance test objects;</p>\n\n<p>&bull; list of requirements that the System and its parts must comply with (with reference to the clauses of the TT for the System);</p>\n\n<p>&bull; scope, conditions, procedure and methods of testing and criteria for evaluating results;</p>\n\n<p>&bull; list and sequence of checks to which the System must be subjected in accordance with the requirements of the TT for the System;</p>\n\n<p>&bull; methods of performing checks for compliance of the indicators of the System as a whole and its components with the requirements of the TT for the System;</p>\n\n<p>&bull; logistics and metrological support for testing;</p>\n\n<p>&bull; acceptance criteria for the System and its parts;</p>\n\n<p>&bull; details of the persons responsible for carrying out the tests;</p>\n\n<p>&bull; the procedure, methods and conditions for checking the functioning and interaction of parts of the System, the functioning of the System as a whole in accordance with the requirements of the TT for the System;</p>\n\n<p>&bull; ensuring safety during testing;</p>\n\n<p>&bull; list and types of reporting documentation.</p>\n\n<p>The program and methodology for acceptance testing are approved by the Agency.</p>\n\n<p>Acceptance tests of the System or its corresponding phase put into permanent operation are carried out by a commission appointed by the Agency at the operating site in accordance with the program and test methodology approved by it.</p>\n\n<p>The timing of acceptance tests and the composition of the commission are determined by the Agency. The commission includes representatives of the developer.</p>\n\n<p>To carry out acceptance tests the following must be presented:</p>\n\n<p>&bull; notification of the readiness of the System or its corresponding queue for acceptance testing;</p>\n\n<p>&bull; TT for the System and TT for parts of the System (if available);</p>\n\n<p>&bull; The system or its corresponding queue being tested;</p>\n\n<p>&bull; documentation for the System;</p>\n\n<p>&bull; program and methodology for acceptance testing;</p>\n\n<p>&bull; agreed tests (test cases);</p>\n\n<p>&bull; software and equipment necessary for testing, and the corresponding operational documentation;</p>\n\n<p>&bull; acceptance certificate for trial operation;</p>\n\n<p>&bull; certificate of completion of trial operation</p>\n\n<p>Acceptance tests should primarily include checking:</p>\n\n<p>&nbsp;</p>\n\n<p>&bull; completeness and quality of implementation of functions at standard, limiting, critical values ​​of parameters of the automation object and in other operating conditions of the System specified in the TT for the System;</p>\n\n<p>&bull; convenience of work for users and staff;</p>\n\n<p>&bull; means and methods for restoring the functionality of the System after failures;</p>\n\n<p>&bull; completeness and quality of operational documentation.</p>\n\n<p>It is recommended to check the completeness and quality of the System functions in two stages. At the first stage, individual functions (tasks, sets of tasks) are tested. At the same time, compliance with the requirements of the System Specifications for functions (tasks, sets of tasks) is checked. At the second stage, the interaction of tasks in the System is checked and the requirements of the TT for the System are met.</p>\n\n<p>The ease of use of users and staff is checked taking into account the completeness and quality of performance of the functions of the System as a whole.</p>\n\n<p>The following are subject to verification:</p>\n\n<p>&bull; completeness of messages and requests available to the user and their sufficiency for operating the system;</p>\n\n<p>&bull; the ability for users and personnel to work without special training;</p>\n\n<p>&bull; reaction of the System and its parts to user errors, functionality of service tools.</p>\n\n<p>&nbsp;</p>\n\n<p>Checking the means of restoring the functionality of the System after failures of technical means should include:</p>\n\n<p>&bull; checking the presence in the operational documentation of recommendations for restoring operability and the completeness of their description;</p>\n\n<p>&bull; practical feasibility of recommended procedures;</p>\n\n<p>The test results of objects provided for by the test program and methodology are recorded in protocols containing the following sections:</p>\n\n<p>&bull; the purpose of the tests and the number of the section of the requirements of the TT for the System, according to which the test is carried out;</p>\n\n<p>&bull; composition of hardware and software used during testing;</p>\n\n<p>&bull; indication of the checks in accordance with which the tests were carried out, processing and evaluation of the results;</p>\n\n<p>&bull; test conditions and characteristics of the initial data;</p>\n\n<p>&bull; testing tools used;</p>\n\n<p>&bull; generalized test results;</p>\n\n<p>&bull; conclusions about test results and compliance of the created System or its parts with a certain section of the requirements of the TT for the System.</p>\n\n<p>Test protocols for objects are summarized in a single protocol, on the basis of which a conclusion is made about the system&rsquo;s compliance with the requirements of the TT for the System.</p>\n\n<p><strong>Industrial exploitation</strong></p>\n\n<p>Operation of the System, put into operation in accordance with the established procedure, in accordance with the project and the safety of which is confirmed by tests at the stage of pilot operation.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>General requirements for acceptance of works by stages</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Below are the main stages and stages performed by the Supplier for the implementation of IP, established in contracts and terms of reference based on O&#39;zDSt 1986: 2018 Information technology.&nbsp;Information Systems.&nbsp;Stages of creation.&nbsp;The main stages of IS implementation are:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>Formation of requirements for the System</li>\n\t<li>System concept development</li>\n\t<li>Technical task</li>\n\t<li>Design</li>\n\t<li>Working documentation</li>\n\t<li>Commissioning</li>\n\t<li>System Maintenance</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>The project implementation methodology should be based on the Waterfall methodology.</p>\n\n<p><strong>RASCI matrix (distribution of responsibilities between project participants)</strong></p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:100.0%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"height:17.15pt; width:4.5%\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:17.15pt; width:24.58%\">\n\t\t\t<p><strong>Responsible</strong><strong> </strong><br />\n\t\t\t(Ответственный)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:17.15pt; width:70.92%\">\n\t\t\t<p>The Project Participant performing the Work to achieve the Project Result. Responsible for the achievement of the Result</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:28.55pt; width:4.5%\">\n\t\t\t<p><strong>A</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.55pt; width:24.58%\">\n\t\t\t<p><strong>Approver</strong><br />\n\t\t\t(Утверждающий)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.55pt; width:70.92%\">\n\t\t\t<p>A project participant who approves the correctness and completeness of the work. Accepts the Results of the Works.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:28.6pt; width:4.5%\">\n\t\t\t<p><strong>S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.6pt; width:24.58%\">\n\t\t\t<p><strong>Support</strong><br />\n\t\t\t(Соисполнитель)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:28.6pt; width:70.92%\">\n\t\t\t<p>A project participant who provides support within his competence for the Responsible.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:18.8pt; width:4.5%\">\n\t\t\t<p><strong>C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.8pt; width:24.58%\">\n\t\t\t<p><strong>Consulted</strong><br />\n\t\t\t(Консультирующий)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:18.8pt; width:70.92%\">\n\t\t\t<p>A project participant whose opinion (resources) is taken into account to create the Project Results. Subject matter experts.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:3.0pt; width:4.5%\">\n\t\t\t<p><strong>I</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:3.0pt; width:24.58%\">\n\t\t\t<p><strong>Informed</strong><br />\n\t\t\t(Информируемый)</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:3.0pt; width:70.92%\">\n\t\t\t<p>A project participant who is informed about the progress of the Work on the creation of the Project Results.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;6.2.1 RASCI Matrix (Distribution of Responsibilities among</em><br />\n<em>Project Participants)</em></p>\n\n<p>&nbsp;</p>\n\n<p>Responsibility matrix for project results</p>\n\n<table cellspacing=\"0\" style=\"width:489.55pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#5b9bd5; width:18.55pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"background-color:#5b9bd5; width:116.45pt\">\n\t\t\t<p><strong>Stage</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"background-color:#5b9bd5; width:155.9pt\">\n\t\t\t<p><strong>Responsible</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#5b9bd5; width:198.65pt\">\n\t\t\t<p><strong>results</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#5b9bd5; width:63.3pt\">\n\t\t\t<p><strong>Suppliers</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#5b9bd5; width:92.6pt\">\n\t\t\t<p><strong>Agency</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#5b9bd5; width:198.65pt\">\n\t\t\t<p><strong>&nbsp;</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>1.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>Formation of requirements for the System</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>1. Terms of reference for a business analysis system;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>2.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>System concept development</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>1. Project charter;</p>\n\n\t\t\t<p>2. Schedule of the project;</p>\n\n\t\t\t<p>3. Report on the results of the work.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>3.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>Technical task</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R, A, C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>Terms of reference for data marts in terms of the received reporting on:</p>\n\n\t\t\t<p>1. NAS;</p>\n\n\t\t\t<p>2. KPI;</p>\n\n\t\t\t<p>3. Fulfillment of the business plan, production indicators, personnel report;</p>\n\n\t\t\t<p>4. Management reporting;</p>\n\n\t\t\t<p>5. IFRS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>4.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>Design</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R, A, C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>Development specifications, data mappings in terms of the received reporting on:</p>\n\n\t\t\t<p>1. NAS;</p>\n\n\t\t\t<p>2. KPI;</p>\n\n\t\t\t<p>3. Fulfillment of the business plan, production indicators, personnel report;</p>\n\n\t\t\t<p>4. Management reporting;</p>\n\n\t\t\t<p>5. IFRS</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>5.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>Working documentation</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>1. Working documentation for the development of reporting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>6.</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>Commissioning</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>R, A, C</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>Reporting on:</p>\n\n\t\t\t<p>1. NAS</p>\n\n\t\t\t<p>2. KPI</p>\n\n\t\t\t<p>3. Implementation of the business plan, performance indicators, personnel;</p>\n\n\t\t\t<p>4. Management reporting</p>\n\n\t\t\t<p>5. IFRS</p>\n\n\t\t\t<p>Guides:</p>\n\n\t\t\t<p>1. Business Analysis System User Guide</p>\n\n\t\t\t<p>2. Business Analysis System Administrator&#39;s Guide</p>\n\n\t\t\t<p>3. Acceptance test procedure</p>\n\n\t\t\t<p>4. Acceptance test report</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"width:18.55pt\">\n\t\t\t<p><strong>7</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:116.45pt\">\n\t\t\t<p>System Maintenance</p>\n\t\t\t</td>\n\t\t\t<td style=\"width:63.3pt\">\n\t\t\t<p><strong>R</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:92.6pt\">\n\t\t\t<p><strong>A, C, S</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"width:198.65pt\">\n\t\t\t<p>Warranty technical support</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><em>Tab.&nbsp;6.2.2 Responsibility matrix for project results</em></p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Requirements for managing organizational change</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>In the Project, in order to effectively adapt employees to changes in processes, it is required to perform work on Organizational Change Management in the following areas:</p>\n\n<p><strong>Communication</strong></p>\n\n<p><strong>Key tasks:</strong></p>\n\n<p>Ensure general awareness and understanding of all stakeholders about the objectives, scope, benefits and achievements of the Project:</p>\n\n<ul>\n\t<li>Create understanding, acceptance and full ownership of the System, organization<br />\n\tand ways of working</li>\n\t<li>Help the implementation team make a successful transition to new processes and tools at all levels</li>\n\t<li>Inform the employees of the Agencyabout the project, goals and status in general</li>\n\t<li>Build an understanding of the impact of the change on all stakeholders of the implementation reach and manage expectations</li>\n</ul>\n\n<p><strong>Organizational Design</strong></p>\n\n<p><strong>Key tasks:</strong></p>\n\n<ul>\n\t<li>Implement the necessary changes in the organization at the level of roles, positions, organizational structure in accordance with changes<br />\n\tin business processes:</li>\n\t<li>Identify changes in the organizational structure, distribution of roles and functions</li>\n\t<li>Form an understanding of changes in roles and positions for each individual, update job descriptions, communicate changes to employees and managers before starting the training process</li>\n\t<li>Plan and implement an organizational transition to a targeted organizational structure and distribution of roles and functions</li>\n</ul>\n\n<p><strong>Education</strong></p>\n\n<p><strong>Key tasks:</strong></p>\n\n<p>Training of the system implementation project team:</p>\n\n<ul>\n\t<li>Ensure that the team members have the necessary knowledge on the implemented technological platform for the successful implementation of the Project</li>\n\t<li>Employee training:</li>\n\t<li>Prepare employees for new responsibilities<br />\n\tand new ways of working</li>\n\t<li>Provide employees with the optimal form of training, at the right time and according to the established goals</li>\n</ul>\n\n<p>Preliminary estimate of the number of employees for training:</p>\n\n<p>&bull; Professional training - business users: 50 people</p>\n\n<p>&bull; Professional training - technical specialists: 20 people.</p>\n\n<p>&bull; Training of employees should be conducted in the language agreed with the Agency.</p>\n\n<p>&bull; Training must be conducted in person on the territory of the Agency (by agreement with the Agency, the option of online training may be agreed upon).</p>\n\n<p>&bull; The skills acquired during the training must fully cover the functional skills of the Agency&#39;s specialists.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Methodological support for Organizational Change Management</strong></p>\n\n<p><strong>Key tasks:</strong></p>\n\n<ul>\n\t<li>Identify all stakeholders of the Project</li>\n\t<li>Transfer knowledge of approaches, methods, techniques, tools used for the effective implementation and management of organizational change management work</li>\n\t<li>Identify key organizational changes by detailed To Be and interviewing experts about the differences with the current process</li>\n</ul>\n\n<p><strong>Assess the impact of change and readiness for change</strong></p>\n\n<ul>\n\t<li>Ensure participation in the formation of a roadmap for work on change management, participation in the formation of key tasks in all areas, in the adaptation of templates and the development of instructions for key tasks</li>\n\t<li>Quality control of the implementation of tasks for managing organizational changes, the formation of proposals for the required adjustments in the approaches, methods and tools used to implement them</li>\n\t<li>Support in the management of work, risks and issues of the implementation of tasks at all stages of the project.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>REQUIREMENTS FOR THE COMPOSITION AND CONTENT OF WORKS ON PREPARING THE SYSTEM FOR COMMISSIONING</strong></li>\n</ol>\n\n<p>By the time the acceptance tests are carried out, all comments on the operation of engineering systems that ensure the functioning of the Agency&#39;s data center must be eliminated.</p>\n\n<p>By the end of the period of trial operation, the maintenance personnel of the system must fully master the practical skills of working with the software and hardware complex.</p>\n\n<p>To prepare the facility for commissioning the System, the Agencymust perform the following work:</p>\n\n<ul>\n\t<li>Develop and implement, together with the executing organization, an action plan for preparing the modernization object for the implementation of the System (subsystems);</li>\n\t<li>Develop, together with the developer organization, and approve additions and changes in job descriptions that determine the work of personnel in the conditions of the System&#39;s functioning;</li>\n\t<li>If necessary, make changes to the organizational structure of the enterprise in order to ensure the required number of employees and technical personnel to ensure the operation of the System in accordance with the personnel requirements set out in section 4 of this document;</li>\n\t<li>Approve the regulatory documents developed as part of the project for the implementation of the System;</li>\n\t<li>Purchase, install and test technical means that ensure the functioning of the System (subsystems), taking appropriate measures to protect the technical means from external influences and unauthorized access;</li>\n\t<li>Prepare and execute the necessary organizational and administrative documentation;</li>\n\t<li>Ensure the solution of organizational issues for consultation<br />\n\tand advanced training of employees who will work<br />\n\twith the System;</li>\n\t<li>Organize the study of the user documentation of the System by all departments and divisions of the authorized body;</li>\n\t<li>Ensure that users study the operational documentation;</li>\n\t<li>Prepare reference and other information and enter<br />\n\tit into the appropriate databases;</li>\n\t<li>Conduct control tests of the System (subsystems) together<br />\n\twith the Supplier at the workplace of the System administrator.</li>\n</ul>\n\n<p>To prepare an object for commissioning the System, the executing company must:</p>\n\n<ul>\n\t<li>Develop and implement, together with the Agencyorganization, an action plan for preparing the facility for the implementation of the System (subsystems);</li>\n\t<li>Develop and provide users with the necessary operational documentation to work with the applied software of the System;</li>\n\t<li>Conduct control tests of the System (subsystems, tasks) together with the Agencyat the workplace of the System administrator;</li>\n\t<li>Consult the key users of the System.</li>\n</ul>\n\n<ol>\n\t<li><strong>DOCUMENTATION REQUIREMENTS</strong>\n\n\t<ol>\n\t\t<li><strong>Project documentation</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<ul>\n\t<li>The list of sets and types of documents to be developed that meet the requirements of O&#39;z DSt 1985: 2018 is agreed by the Supplier with the Agencyon the basis of the protocols.</li>\n\t<li>The ISS documentation must comply with RH 34-381-1022: 2009.&nbsp;&quot;Position.&nbsp;General requirements for the organization of comprehensive protection<br />\n\tand information security&rdquo;.</li>\n\t<li>The documentation handed over to the Agencymust be made<br />\n\tin paper and electronic form on a carrier.</li>\n\t<li>The delivery of the System must be accompanied by the submission of a set of documentation of the following composition in Russian:</li>\n\t<li>User manuals (including operations of loading and manual data entry, work with reporting forms, other means of displaying data, etc. should be described);</li>\n\t<li>Administrator&#39;s Guide (including the procedure for installing and configuring the System - the client side and the DBMS, the procedure for differentiating access rights and managing user accounts, restoring the software in case of failures, auditing, etc.);</li>\n\t<li>The supplier must provide support and maintain documentation up<br />\n\tto date for the entire duration of the contract;</li>\n\t<li>Technical description of the customization of system modules;</li>\n\t<li>A technical description of the configured integrations;</li>\n\t<li>Explanations how the Agencyin the solution proposed by the Supplier is protected from the need for additional investments during the period of the project until it is put into commercial operation.</li>\n\t<li>Instructions for setting up business processes for the administrator<br />\n\tand advanced business user.</li>\n</ul>\n\n<p>&emsp;</p>\n\n<ol>\n\t<li><strong>SOURCES OF DEVELOPMENT</strong></li>\n</ol>\n\n<p>The sources for the development of this technical task are state industry standards of the Republic of Uzbekistan, guidelines and methodological materials:</p>\n\n<ul>\n\t<li>O&#39;zDSt 1986: 2018 &ldquo;Information technology.&nbsp;Information Systems.&nbsp;Stages of creation &quot;;</li>\n\t<li>O&#39;zDSt 1987: 2018 &ldquo;Information technology.&nbsp;Terms of Reference for the Creation of an Information System &quot;;</li>\n\t<li>O&#39;zDSt ISO / IEC 2392-8: 2015 &ldquo;Information technology.&nbsp;Information Security.&nbsp;Terms and Definitions&quot;;</li>\n\t<li>O&#39;zDSt ISO / IEC 27001: 2016 &ldquo;Information technology.&nbsp;Methods for ensuring the security of the information security management system.&nbsp;Requirements&quot;;</li>\n\t<li>O&#39;zDSt ISO / IEC 27002: 2016 &ldquo;Information technology.&nbsp;Security methods.&nbsp;Practical rules for information security management &quot;;</li>\n\t<li>RH 45-170: 2004.&nbsp;Guidance document.&nbsp;&quot;Basic technical requirements for the creation of local and corporate departmental computer networks&quot;;</li>\n\t<li>T 45-194: 2007 &quot;Recommendations for the use of software and hardware to prevent acts of illegal entry into information systems.&quot;</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>PROJECT ASSUMPTIONS AND RESTRICTIONS</strong>\n\n\t<ol>\n\t\t<li><strong>Organizational Assumptions and Constraints</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<ul>\n\t<li>All meetings on the Project are held on the territory of the Agency&#39;s divisions in Tashkent.&nbsp;All negotiations and correspondence, as well as the documentation of the Project are conducted in Russian;</li>\n\t<li>When implementing a project, the Agencyensures the involvement of employees in the project who have all the necessary information and authority to make decisions on the project;</li>\n\t<li>The environment for industrial operation of the System is prepared by the Supplier &#39;s specialists;</li>\n\t<li>Starting from the Design phase, the Agencyincludes 5 specialists in the design team;</li>\n\t<li>It is assumed that there are technical and organizational capabilities for the work of the Supplier &#39;s specialists on the development / testing environments of the Agency, including the possibility of remote work;</li>\n\t<li>The terms of implementation of the Solution depend on the clarified requirements and the timing of the implementation of improvements and the implementation of design work on the side of the Agency.&nbsp;The timing of the completion of each of the stages should be clarified based on the results of the analysis of the requirements and the preparation of a joint schedule;</li>\n\t<li>The area of ​​responsibility of the Consultant does not include control over the timing and results of related projects, the results of which may be related to the project for the implementation of the target system;</li>\n\t<li>The warranty technical support of the system is limited to the period of trial operation and is 1 (one) year.&nbsp;Warranty technical support includes only cases of elimination of defects, i.e.&nbsp;inconsistency of the result of the Services provided with the relevant technical requirements and / or other project documentation developed within the framework of the project, which arose through the fault of the Supplier;</li>\n\t<li>On the part of the Agency, a project manager is allocated for the entire duration of the project, who is the main entry point for communication with the Agency, and also coordinates the work of the Agency&#39;s divisions taking part in the project;</li>\n\t<li>On the Agency&#39;s side, the availability of key specialists (IT and business units) must be ensured for meetings, conferences, interviews to collect requirements in accordance with the requirements of the Consultant, which will be developed at the stage of project planning;</li>\n\t<li>The project evaluation does not include stress testing of the system.&nbsp;Such testing can be performed outside the scope of this assessment after the requirements for stress testing have been agreed.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li><strong>Restrictions on the scope of work</strong></li>\n\t</ol>\n\t</li>\n\t<li>When distributing responsibility for specific work between the Supplier and the Agency, it is necessary to be guided by the matrix, the distribution of responsibilities by the project participants;</li>\n\t<li>If during data migration it is required to save the history of operations for the previous reporting periods, then the Supplier will arrange for the migration of this data on the registration cards of objects.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li><strong>Limitations on the scope of work</strong></li>\n\t</ol>\n\t</li>\n\t<li>A detailed list of automated reporting is formed at the stage of the project &quot;Detailed analysis of reporting requirements&quot; in the form of a separate application;</li>\n\t<li>It is assumed that the main source of integration for building a system of accounting and monitoring the activities of enterprises<br />\n\twith state participation is the existing database of the Agency, the database of the State Oil Company, the web-form (kpi.davaktiv.uz);</li>\n\t<li>It is assumed that the depth of migrated data from the systems of the Agency&#39;s sources does not exceed 4 years.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li><strong>Limitations on implemented functionality</strong></li>\n\t</ol>\n\t</li>\n\t<li>The work on the completion of the adjacent systems of the project in the integration contour is carried out by the efforts of the;</li>\n\t<li>The work on the deployment of the IT infrastructure necessary for the implementation of the project is carried out by the Supplier.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li>\n\t<ol>\n\t\t<li><strong>Restrictions on the composition and form of results</strong></li>\n\t</ol>\n\t</li>\n\t<li>Project documents are prepared on the basis of templates provided by the Agency and agreed at the stage of project preparation;</li>\n\t<li>The format of the results and the procedure for their acceptance for each phase of the project are determined jointly by the Supplier and the Agencyat the beginning of each phase of the project.</li>\n</ul>\n\n<ol>\n\t<li><strong>Terms of the Project execution</strong></li>\n</ol>\n\n<p>During the execution of the Project, the following conditions are expected to be met:</p>\n\n<ul>\n\t<li>The Project will be managed in accordance with the approved Charter.</li>\n\t<li>Providing conditions for the successful work of the project team, the availability of the necessary infrastructure, including premises and equipment for the functioning of the System.</li>\n</ul>"},{"id":"OP00280697","notice_type":"Request for Expression of Interest","noticedate":"21-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-04-19T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P171967","project_name":"Regional Infrastructure Finance Facility (RIFF) Project","bid_reference_no":"ZM-COMESA -394070-CS-LCS","bid_description":"Human Resource Management System","procurement_group":"CS","procurement_method_code":"LCS","procurement_method_name":"Least Cost Selection","contact_address":"Ben Bella Road, P. O. Box 30051, Lusaka","contact_ctry_name":"Zambia","contact_email":"jmutale@comesa.int","contact_name":"Mohamed Kheir  Elginaid","contact_organization":"COMESA","contact_phone_no":"+260979413591","submission_date":"2024-03-21T00:00:00Z","notice_text":"<p><strong>COMMON MARKET FOR EASTERN AND</strong></p>\n\n<p>SOUTHERN AFRICA</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>السوق المشتركة للشرق والجنوب الأفريقى</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>MARCHE COMMUN</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>REQUEST FOR EXPRESSION OF INTEREST</strong></p>\n\n<p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(FIRM SELECTION)</strong></p>\n\n<p>&nbsp;</p>\n\n<p><strong>NAME OF PROJECT</strong><strong>: REGIONAL INFRASTRUCTURE FINANCE FACILITY &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(RIFF) PROJECT</strong></p>\n\n<p><strong>GRANT NO: D6780-3A</strong></p>\n\n<p><strong>ASSIGNMENT TITLE: PROCUREMENT OF A&nbsp; HUMAN RESOURCE MANAGEMENT SYSTEM&nbsp; .&nbsp;&nbsp; </strong><strong>REFERENCE No. </strong><strong>ZM-COMESA -</strong><strong> 394070-CS-LCS</strong></p>\n\n<p><strong>ISSUED ON</strong><strong> : 21 &nbsp;MARCH 2024</strong></p>\n\n<ol>\n\t<li>Background</li>\n</ol>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) received a grant from the World Bank towards the implementation of the Regional Infrastructure Finance Facility project and intends to apply a portion of the proceeds of this grant to eligible payments under the contract for the procurement of a Human Resource Management System.</p>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased cooperation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>The COMESA Secretariat wishes to procure a Human Resource Management System that will be a digital platform to be used to support the COMESA Secretariat&rsquo;s Human Resource processes. The System will among others help to streamline recruitment management, benefits administration, payroll management, employee data, employee performance, compensation management, timesheets and other Human Resource Management functions. It will also leverage technology to increase efficiency and effectiveness in the management of the Human Resource functions and ensure reliability and integrity of the data.</p>\n\n<ol>\n\t<li>objectives of the system</li>\n</ol>\n\n<p>The main objectives of the Human Resources Management system is to help COMESA enhance its systems, improve productivity, availability, reliability, and flexibility, and minimize response time in a cost-effective way.&nbsp; Furthermore, it is expected that a new HRMS will help COMESA to:</p>\n\n<ol>\n\t<li>Work Smarter by increasing efficiency and reducing back-office interventions thus increasing COMESA&rsquo;s performance and reducing costs;</li>\n\t<li>Work Remotely since the system would be accessible from anytime and anywhere.&nbsp; In addition, employees should be able to access their personal information, submit leave requests, update contact details, view pay slips, and participate in performance appraisals via an employee self-service portal; and&nbsp;</li>\n\t<li>Work Securely by protecting and controlling employee&rsquo;s data and information confidentially every time.</li>\n</ol>\n\n<ol>\n\t<li>Current Problems to resolve</li>\n</ol>\n\n<p>The following problems need to be resolved:</p>\n\n<ol>\n\t<li><strong>Technology</strong>: Manual processes should be automated, and the system should be developed on the latest technologies.&nbsp;</li>\n\t<li><strong>Mobility</strong>: Staff should be able to access the system and its e-services at any time, from anywhere, and on different types of devices (tablets, mobiles, laptops, etc.).</li>\n\t<li><strong>Collaboration</strong>: The HR processes should be able to fully integrate with current and future application systems.</li>\n\t<li><strong>Security</strong>:&nbsp; The system should meet the security requirements as per industry standards, best practices and IT audit requirements of COMESA.</li>\n\t<li><strong>Scalability</strong>: All applications/systems at COMESA should be able to accommodate new features/modules to meet the changing organizational needs.</li>\n\t<li><strong>Integration</strong>: The system should be able to fully integrate with current and future relevant application systems.</li>\n\t<li><strong>Reports</strong>: The system should be able to generate Reports that are accurate and promotes integrity of the data.</li>\n</ol>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment are attached to this request for Expressions of Interest (EOI).</strong></p>\n\n<p>The Common Market for Eastern and Southern Africa now invites eligible consultants to indicate their interest in providing these services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, core business and not less than 10 years&rsquo; experience in similar assignments, relevant experience, technical and managerial capability of the firm, etc). Consultants may constitute joint ventures to enhance their chances of qualification but should indicate clearly whether the association is in the form of a joint venture. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; &nbsp;November &nbsp;2020 setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<ol>\n\t<li>SUBMISSION</li>\n</ol>\n\n<p>Expressions of interest must be submitted &nbsp;in written&nbsp; to the following email address;</p>\n\n<p>Tenders@comesa.int with a copy to procurement@comesa.int</p>\n\n<p><strong>ASSIGNMENT TITLE:</strong><strong>PROCUREMENT OF A HUMAN RESOURCE MANAGEMENT SYSTEM.&nbsp;&nbsp;&nbsp; </strong><strong>REFERENCE No. ZM-COMESA -394070-CS-LCS</strong></p>\n\n<p>ATT: THE&nbsp;HEAD&nbsp;OF&nbsp;PROCUREMENT, COMESA&nbsp;SECRETARIAT, BEN&nbsp;BELLA ROAD, LUSAKA, ZAMBIA</p>\n\n<p>&nbsp;&nbsp;&nbsp;CLOSING DATE FOR SUBMISSION</p>\n\n<p>The Closing date for receipt of Expression of Interest is 19th April 2024 <strong><em>at 10:00 hours Central &nbsp;Africa Time (CAT)</em></strong></p>\n\n<p>Further information can be obtained at the address below during office hours, &nbsp;<strong>09:00 - 17: 00 hours</strong> <strong>Central Africa Time (CAT)</strong> to the following address.</p>\n\n<p>COMESA Secretariat, Ben Bella Road, Lusaka, Zambia</p>\n\n<p>Email address:&nbsp; procurement@comesa.int</p>\n\n<p>&nbsp;</p>\n\n<p><strong>NB: Physical submission of EOIs shall &nbsp;not be accepted.</strong></p>\n\n<p><strong>ANNEX 1: TERMS OF REFERENCE&nbsp;</strong></p>\n\n<p><strong>COMMON MARKET FOR EASTERN AND</strong></p>\n\n<p>SOUTHERN AFRICA</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;\n<ol>\n\t<li><strong>Background</strong></li>\n</ol>\n</p>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased co-operation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>The COMESA Secretariat wishes to procure a Human Resource Management System that will be a digital platform to be used to support the COMESA Secretariat&rsquo;s Human Resource processes. The System will among others help to streamline recruitment management, benefits administration, payroll management, employee data, employee performance, compensation management, and timesheets. It will also leverage technology to increase efficiency and effectiveness in the management of the Human Resource functions and ensure reliability and integrity of the data.</p>\n\n<ol>\n\t<li><strong>Purpose of this document</strong></li>\n</ol>\n\n<p>This document identifies the User requirements, Functional and Non-functional specifications for a Human Resource Management System (HRMS) for COMESA Secretariat. Furthermore, it specifies the scope of work, methodology and deliverables for the HRMS project.</p>\n\n<ol>\n\t<li><strong>Main Objectives of a modern HMRS</strong></li>\n</ol>\n\n<p>The main objectives of the project are to help COMESA to enhance its systems to improve productivity, availability, reliability, and flexibility, and minimize response time in a cost-effective way.&nbsp; Furthermore, it is expected that a new HRMS will help COMESA to:</p>\n\n<ol>\n\t<li>Work Smarter:&nbsp;Increase efficiency and reduce back-office interventions thus increasing COMESA&rsquo;s performance and reducing costs.</li>\n\t<li>Work Remotely: The system should be accessible from anytime and anywhere.&nbsp; In addition, employees should be able to access their personal information, submit leave requests, update contact details, view pay slips, and participate in performance appraisals via an employee self-service portal.&nbsp;</li>\n\t<li>Work Securely:&nbsp;Protecting and controlling employee&rsquo;s data and information confidentially every time.</li>\n</ol>\n\n<ol>\n\t<li><strong>Current Problems to resolve </strong></li>\n</ol>\n\n<p>The following problems need to be resolved:</p>\n\n<ol>\n\t<li><strong>Technology</strong>: Manual processes should be automated, and the system should be developed on the latest technologies. &nbsp;</li>\n\t<li><strong>Mobility</strong>: Staff should be able to access the system and its e-services at any time, from anywhere, and on different types of devices (tablets, mobiles, laptops, etc.).</li>\n\t<li><strong>Collaboration</strong>: The HR processes should be able to fully integrate with current and future application systems.</li>\n\t<li><strong>Security</strong>:&nbsp; The system should meet the security requirements as per industry standards, best practices and IT audit requirements of COMESA.</li>\n\t<li><strong>Scalability:</strong> All applications/systems at COMESA should be able to accommodate new features/modules.</li>\n</ol>\n\n<ol>\n\t<li><strong>Scope of Work</strong></li>\n</ol>\n\n<p>The scope of work of the project is as follows:</p>\n\n<ol>\n\t<li><strong>Implementation and Customization of an Off the Shelf HRMS System. </strong></li>\n</ol>\n\n<p>The supplier is expected to implement a comprehensive user friendly HRMS solution and to customize the HRMS package as per COMESA user requirements.</p>\n\n<p>The HRMS solution shall be developed using a modular approach to enhance flexibility, scalability, and maintainability. The solution shall consist of distinct modules, with each module catering to specific HRMS functionalities such as employee management, recruitment, onboarding, benefits administration, payroll, etc.</p>\n\n<p>The core HRMS functions and the Payroll functions will be treated as independent systems and be implemented as a separate, dedicated module. Integration between core HRMS and Payroll modules shall be seamless, enabled through a Service Oriented Architecture (SOA) approach or any other integrating approach that follows industry best practices.</p>\n\n<ol>\n\t<li><strong>Integration</strong></li>\n</ol>\n\n<p>The application should be fully integrated with the Sun Accounting System, COMESA Portal, Document Management System, active directory and with a workflow management system.</p>\n\n<ol>\n\t<li><strong>Migration of Data</strong></li>\n</ol>\n\n<p>The bidder should provide an effective and efficient data migration approach of all existing data from the current system (Smart HR) to the configured environment. The successful bidder will be expected to provide full support to the COMESA during the data migration phases, including the identification and resolution of data quality issues.</p>\n\n<ol>\n\t<li><strong>Training and Knowledge Transfer</strong></li>\n</ol>\n\n<p>The bidder shall provide a detailed training plan to ensure proper knowledge transfer to the business users as well as the IT Administrators. The bidder shall provide specific training programme for:</p>\n\n<ol>\n\t<li>Business users to continue operational responsibility for the delivered solution.</li>\n\t<li>IT staff to enable first line support to users and for the proper administration of the delivered solution.</li>\n\t<li>Business users and IT staff create and eventually customize reports/dashboards using the proposed reporting tools.</li>\n\t<li>Business users and IT staff perform basic administration tasks like create users, assign roles to users and de-activate users.</li>\n</ol>\n\n<ol>\n\t<li><strong>Documentation</strong></li>\n</ol>\n\n<p>The successful bidder will be required to provide a comprehensive set of documentations regarding the application system including the solution blueprint, system manual, installation manual and user manual.</p>\n\n<ol>\n\t<li><strong>Post implementation support</strong></li>\n</ol>\n\n<p>The Bidder should provide a minimum of two (3) months on-site post implementation support.</p>\n\n<ol>\n\t<li><strong>Warranty</strong></li>\n</ol>\n\n<p>The warranty period should be for a period of 12 months, effective immediately after the expiry of the on-site post implementation support period. The warranty shall cover all configurations and functions as stated in the scope of the work for corrective maintenance.</p>\n\n<ol>\n\t<li><strong>Support and Maintenance after warranty period</strong></li>\n</ol>\n\n<p>Bidders shall submit their support and maintenance costs related to support over the next two (2) years after the warranty period, based on an agreed Service Level Agreement (SLA) (8x5). The support shall cover among other troubleshooting/bug fixing, patch management, fine tuning and health checks. Bidder should also provide the response time to blocking/non-blocking issues as well as their rates on an hourly basis for any intervention that is not covered under SLA. COMESA reserves the right to proceed with award and renewal of the Maintenance agreement.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Human Resource Management System Specification</strong></li>\n</ol>\n\n<p>The specifications of the Human Resource Management System include features which have been divided into Functional Solution Requirements and non-functional solutions Requirements as follows:</p>\n\n<p><strong>6.1&nbsp;&nbsp;&nbsp;&nbsp; Functional Systems Requirements</strong></p>\n\n<p>Functional requirements define what a system must do, and the features it must have to fulfil user Requirements. This enables a system to meet the specific user requirements and describe the system behavior under specific conditions.</p>\n\n<p>The specific features and functions of Human Resource Management System to serve the requirement of the COMESA Secretariat will require to have the following modules with the descriptions indicated below:</p>\n\n<ol>\n\t<li><strong>Core Human Resource Module</strong></li>\n</ol>\n\n<p>The core HR module should be able to store all the required information about employees and will be the main repository for functionality that is applicable to the whole Human Resource management system. This would be Employee Master Data that will have employees&rsquo; information in one centralized database. The employee information will include the following: employee details (name, date of birth, age, address, emergency contacts, next of kin, salary, job title, grade, Division/Unit, incremental dates, dependent information, effective date of contract, contract expiry date, etc.), employment history, employee qualifications, benefits and compensation, performance history, etc.</p>\n\n<ol>\n\t<li><strong>Recruitment Module</strong></li>\n</ol>\n\n<p>Recruitment module would enable the Secretariat to manage all recruitment activities using a single, intuitive self-service interface. The recruitment module shall provide facilities for job posting, candidate sourcing, application management, screening, and assessment of candidates. The automation of the recruitment function would assist in the shortlisting process as applicants would submit their applications online and the shortlisting would be seamlessly done sieving the applications based on a set criterion in line with the job requirements. The automation of the recruitment would reduce purported biases in the shortlisting process thereby promoting objectivity and fairness of the entire process. &nbsp;The system shall be used to schedule and manage interviews, maintain a candidate database for future reference and talent acquisition.</p>\n\n<ol>\n\t<li><strong>On Boarding Module</strong></li>\n</ol>\n\n<p>The onboarding module should help the Secretariat to effectively onboard and integrate new employees into the company. The onboarding module aims to create a positive and engaging experience for new hires, fostering their connection to the organization and setting them up for success. By automating and centralizing onboarding processes, it saves time, reduces paperwork, and ensures consistent and standardized onboarding practices across the organization. Some of the tools and functionalities to streamline the process of welcoming, orienting, and training new hires, ensuring a smooth transition and facilitating their productivity from day one. Some of the features include pre-boarding, new hire paperwork &amp; documentation, orientations, etc.</p>\n\n<ol>\n\t<li><strong>Benefits</strong></li>\n</ol>\n\n<p>This module should help manage the administration of benefits that aligns with the Secretariats applicable benefits and policies, and the approved budget. It should enable users to factor in benefits such as Medical, Education Allowance, Dependency and Spouse Allowances, Overtime, Advances, Acting Allowance (where applicable) and any other applicable benefits. Employees should be able to have easy access to applicable benefits and how they have been utilized through self-service. Features of the module should among others include:</p>\n\n<ol>\n\t<li>Eligibility rules to determine which employees are entitled to certain benefits.</li>\n\t<li>Budgets that can restrict managers from overspending.</li>\n\t<li>Inbuilt Workflows and approval processes.</li>\n\t<li>Inclusion of data security and control to protect sensitive data; and</li>\n\t<li>Synchronizing data to payroll to avoid rekeying data.</li>\n</ol>\n\n<ol>\n\t<li><strong>Employee self-services</strong></li>\n</ol>\n\n<p>Self-Service Human Resources will enable staff in the Secretariat to be able to manage information through interfaces personalized to their roles, on-line experience, work content, language, and information needs. Staff would be given user rights to access the Employee Self-Service Module that would allow them to do the following:</p>\n\n<ol>\n\t<li>Change personal information.</li>\n\t<li>Apply for Leave.</li>\n\t<li>View Pay slips Online (including historical payroll).</li>\n\t<li>Apply for advances.</li>\n\t<li>Prepare Individual Training Plan.</li>\n\t<li>Perform self-assessments.</li>\n\t<li>Update their Curriculum Vitae; and</li>\n\t<li>Query personal information.</li>\n</ol>\n\n<ol>\n\t<li><strong>Performance Management</strong></li>\n</ol>\n\n<p>Performance Management is a key module that would enable the Secretariat to continuously measure the performance of its employees effectively.&nbsp;It should have five components that include planning, monitoring, performance feedback, developing, rating, and rewarding. These components should work together and support each other to ensure effective performance management.</p>\n\n<p>The performance management module should be customized to suit the current Performance Management system being used by the Secretariat, which is the Balance Scorecard. It should also have features to be aligned to other Performance Management Systems.</p>\n\n<p>It should enable users to look back through data and offer future performance guides according to desired KPIs and goals.&nbsp; It must also offer tailored and customizable analytics and reports from system&rsquo;s data with real-time information and reporting that facilitates timely decisions that enhance performance against KPIs.</p>\n\n<ol>\n\t<li><strong>Training and Development</strong></li>\n</ol>\n\n<p>The HRMS should have a Training and Development module that offers a full range of learning options manageable from one interface. This includes mapping activities against competency frameworks for personal performance management and connecting learning outcomes to desirable skill-building.</p>\n\n<p>This module should ensure that training interventions are made in a systematic manner to avoid haphazard requests for training. Training should be needs based and the module should make it simple track&nbsp;training&nbsp;and make informed&nbsp;development&nbsp;decisions. It should enable users to access personal training records, future training needs/requirements and personal development archives.&nbsp;</p>\n\n<ol>\n\t<li><strong>Time and Attendance</strong></li>\n</ol>\n\n<p>As a process of tracking employee working hours, the time and attendance model is very critical as it would assist COMESA Secretariat to unlock functions like absence management, employee scheduling, clocking in and out, compliance, cost estimates, and payroll integration. It would provide features to track and manage the absence of employees and capture working hours on a timesheet. It is very necessary that the module should be aligned to the Secretariats policies and practices. The key features of the module should among others include:</p>\n\n<ol>\n\t<li>Creation of attendance modules, manage schedules, and set notifications and alerts that enable users to check things like attendance or overtime.</li>\n\t<li>Keeping a record of their hours.</li>\n\t<li>Provision of options such as PINs, biometric scanners, magnetic card readers, and fingerprint and facial recognition tools.</li>\n\t<li>Check and use data for reporting and compliance purposes.</li>\n\t<li>Provide automatic alerts and notifications when there is noncompliance with policies and practices.</li>\n\t<li>provide the ability to configure all the absence types used by the Secretariat and define which absence types apply to which employee populations.</li>\n\t<li>produce schedules and timesheets that display, and capture required information.</li>\n\t<li>provide exception reporting to highlight missed shifts, missed clock-outs and overtime.</li>\n\t<li>specify statutory holidays by country and region and configure eligibility requirements; and</li>\n\t<li>Provide approval workflows and reminders for absence requests and completed timesheets.</li>\n</ol>\n\n<ol>\n\t<li><strong>Leave Management</strong></li>\n</ol>\n\n<p>Leave Management Software facilitates the effective and smooth management of personnel leave. It will enable the Human Resources Unit to always be up to date with the leave management. Its main objective is to handle employees&#39; leave requests impartially while ensuring that the employees&#39; absence from work does not adversely affect the business.&nbsp;&nbsp; The system facilitates the total leave process, from completing leave applications by employees, leave application approval by HR and the final approving Officer. The salient features required for this module should among others include:&nbsp;</p>\n\n<ol>\n\t<li>On-line application for leave without the need for paperwork.</li>\n\t<li>Email notifications to approving officer and applicants.</li>\n\t<li>Applicant and Approving Officer should be able to check complete leave records and approval history respectively.</li>\n\t<li>Leave records to be updated automatically once applications are approved.</li>\n\t<li>Leave records to be printed out or generated into reports.</li>\n\t<li>Leave records to be exported to any back-end system.</li>\n\t<li>Advanced features such as block leave, document tracking and leave adjustment; and</li>\n\t<li>All leave policies and requirements such as leave entitlements, forfeiture of leave days should be configurable in the system.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Payroll Administration Module</strong></li>\n</ol>\n\n<p>The Payroll Administration Module shall be treated as independent system. However, the system shall allow seamless integration between the HRMS and Payroll modules. As an extension of the Core HR module, it would be used to maintain payroll data and manage the payroll process. It is critical in reducing set-up costs, administrative time, and processing errors. The key features of the module should among others include:</p>\n\n<ol>\n\t<li>To calculate employee salaries and benefit and support multiple currencies.</li>\n\t<li>Enough payroll codes to meet current and future needs.</li>\n\t<li>Employee access to pay statements and other tax-related forms.</li>\n\t<li>Integration with the time and attendance module and benefits module.</li>\n\t<li>Simple data validation tools to ensure data is correct before being submitted.</li>\n\t<li>Payroll comparison to highlight significant changes from one pay cycle to the next.</li>\n\t<li>User driven process of rules definition with the ability to link user defined formulas to calculate any type of payroll element (payment, deduction, tax, benefit).</li>\n\t<li>Process many payrolls quickly and easily in a single day.</li>\n\t<li>Create innovative compensation plans &ndash; from salary, overtime, and union deductions to company cars, health insurance, and company pension contributions.</li>\n\t<li>Make retroactive adjustments to employee past earnings or deductions based on changes to pay rates, contribution table values, or other information.</li>\n\t<li>Examine employee payment history at any time.</li>\n\t<li>Perform all the necessary post processing to generate payment for employees once satisfied that payroll run results are correct; and</li>\n\t<li>Advanced feature that allows you to undo and correct payment mistakes.</li>\n\t<li>Tight integration with core HR to avoid rekeying data and maintain reliability of the data.</li>\n\t<li>Integrability with the existing Sun System or any other accounting systems to facilitate timely, accurate and seamless payments of salaries and benefits.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Analytics and Reporting</strong></li>\n</ol>\n\n<p>The system should provide a flexible management reporting tool with data extraction in various formats such as PDF or Excel and includes drilling capabilities. It should include interactive dashboards and highly formatted reporting. Users should be able to design their own reports and generate them in a wide range of formats including listing, charts, and pivot tables.&nbsp; Users should be able to access data at different levels of granularity in a single report itself.</p>\n\n<p>The objective is to facilitate decision-making with regards to HR Management.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>6.2&nbsp;&nbsp;&nbsp;&nbsp; Non-Functional Requirements</strong></p>\n\n<p>Non-functional requirements or features are not related to the system functionality but define how the system should perform. Some examples are the technical specifications, which are components of an HR system including security, scalability, user friendliness speed, Usability, Maintainability, Support, Regulatory, Compatibility and integrability among others are detailed below.</p>\n\n<p>&nbsp;</p>\n\n<p>These features are usually expressed as constraints or criteria that define a level of freedom for developers or users. Although non-functional requirements may seem a bit subtler, they are still as important as functional features. The description of the features that will be required in the Human Resource System are as follows:</p>\n\n<ol>\n\t<li><strong>External interface requirements</strong>\n\n\t<ul>\n\t\t<li><strong>i. User interface requirements</strong></li>\n\t</ul>\n\t</li>\n</ol>\n\n<p>The user interface is key to application usability. The System should include content presentation, application navigation, and user assistance.</p>\n\n<p><strong><em>Role-based User Groups:</em></strong> The system must provide users with screens focusing on their roles (minimizing clutter).</p>\n\n<p><strong><em>Dynamic content presentation:</em></strong><strong> </strong>Users should be provided with in data presentation. The system should allow users to select appropriate settings and property values on display options that fits their preferences, e.g., choice of whether data appears in a grid, a chart, or a grid/chart combination.</p>\n\n<p><strong><em>User assistance: </em></strong>the system should provide online help that includes comprehensive instructions on using each feature. The users should be provided with default mechanisms for accessing help pages e.g., by clicking the question mark icon across all the screens or a distinct menu Help &gt; Help... menu option in the menu bar. A link to a comprehensive help resource should be provided in various formats e.g., Wiki, PDF etc.</p>\n\n<p><strong><em>User navigation</em></strong>: the system should provide a simple traceable navigation of the entire system with options clearly showing the users where they are and how they can navigate away from the current screens and consequences of doing so.</p>\n\n<p><strong><em>Saving users&rsquo; work</em></strong>: The system should provide users performing data manipulation tasks to save their work at a certain point or make a particular view of the data available to other users.</p>\n\n<p><strong><em>Branding guide</em></strong>: the system interface design will adhere to the COMESA branding guide which shall be provided.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>ii. Hardware interface requirements</strong></li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>All server-side components must execute on server-class computers. All client-side components must execute on workstation-class and personal-class computers.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>iii. Software interface requirements</strong></li>\n\t</ul>\n\t</li>\n</ul>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li>The system shall communicate with the COMESA active directory system to provide role-based authentication as shall be provided during detailed requirements gathering stage.</li>\n\t\t<li>The system shall have an interface with the COMESA public facing website to publish vacancies and various recruitment drives.</li>\n\t\t<li>The system shall interface with the COMESA Financial Management System to interface staff costs and relevant expense accounts and salary payments directly to staff bank accounts.</li>\n\t\t<li>The system should be able to integrate with a Document Management System and a workflow management system.</li>\n\t</ol>\n\t</li>\n</ol>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>iv. Communication interface requirements</strong></li>\n\t</ul>\n\t</li>\n</ul>\n\n<p><strong><em>Web browser</em></strong><strong>: </strong>The system must provide an option to be accessed via the internet using the latest browsers e.g., Chrome, Edge, Mozilla, Safari with backward compatibility support to 2 versions.</p>\n\n<p>Note: in a scenario where the system uses third party plugins to run, this must be stated in advance for information security tests and clearance.</p>\n\n<p><strong><em>Communication standards and Network server communications protocols</em></strong>: All communications between the server components and user interactions must be encrypted to safeguard user and data privacy. Only secure protocols shall be permitted e.g., HTTPS, FTPS with appropriate authentication and authorization mechanisms.</p>\n\n<p><strong><em>Electronic forms</em></strong>: the system must provide interfaces using electronic forms either on the browser or client application. The forms must be secured.</p>\n\n<p><strong><em>Data transfer rates</em></strong>: The system must provide appropriate data transfer rates that shall be agreed upon meeting performance requirements.</p>\n\n<p><strong><em>E-mail:</em></strong> the system must provide communication mechanisms with various stakeholders or user groups within the system. This can be achieved via forms that create support tickets or defined emails on the COMESA (comesa.int) domain.</p>\n\n<p><strong><em>Communication security or encryption</em></strong>: end to end encryption must be provided in all the interactions in the system e.g., chat facilities, web browsers, mobile apps etc.</p>\n\n<ol>\n\t<li><strong>Performance</strong></li>\n</ol>\n\n<p>The system should be responsive and perform efficiently, even with many concurrent users and data. It should have acceptable response times for tasks such as employee data retrieval, report generation, and system updates. System performance is the most important quality in non-functional requirements and affects almost all the other preceding ones. A stress test is to be performed by the vendor once the system is commissioned.</p>\n\n<p>The reliability, availability, and maintainability (RAM) features fall exclusively under these requirements.</p>\n\n<ol>\n\t<li><strong>Reliability</strong></li>\n</ol>\n\n<p>Reliability is the probability and&nbsp;percentage&nbsp;of the software performing without failure for a specific number of uses or amount of time.</p>\n\n<ol>\n\t<li><strong>Availability</strong></li>\n</ol>\n\n<p>The system should be designed to minimize downtime through robust error handling, fault tolerance, and backup and recovery mechanisms. It should also have appropriate monitoring and alerting capabilities to identify and address potential issues proactively.</p>\n\n<ol>\n\t<li><strong>Maintainability</strong></li>\n</ol>\n\n<p>This feature indicates the average time, ease, and rapidity with which a system can be restored after a failure.</p>\n\n<ol>\n\t<li><strong>Recoverability</strong></li>\n</ol>\n\n<p>Recoverability is the ability to recover from a crash or a failure in the system and return to full operations.</p>\n\n<ol>\n\t<li><strong>Capacity</strong></li>\n</ol>\n\n<p>This feature indicates the system&rsquo;s storage capacity, which is dependent on its type and characteristics. The system should have enough storage capacity and backup to store all the employee data.</p>\n\n<ol>\n\t<li><strong>Serviceability</strong></li>\n</ol>\n\n<p>This feature indicates how easy it is to perform service when necessary.</p>\n\n<ol>\n\t<li><strong>Security</strong></li>\n</ol>\n\n<p>Security measures ensure the software&rsquo;s safety against espionage or sabotage. These features are necessary even for stand-alone systems and it is necessary to ensure that access to sensitive data is restricted or limited. Some security features may include encryption of data on database and web services, implementation using HTTPS, only authorized users are able to access the system via an authentication mechanism and Role based access.</p>\n\n<p>The HRMS shall implement secure user authentication mechanisms, including username/password, multi-factor authentication (MFA), or Single Sign-On (SSO). User access to HRMS functionalities and data shall be role-based, with strict control over user permissions. The system shall enforce strong password policies, requiring password complexity, regular expiration, and lockout after multiple failed login attempts. Additionally, employee data, such as personal information, financial records, and performance evaluations, shall be encrypted both at rest and during transmission to safeguard data privacy. The HRMS shall comply with data privacy regulations and ensure data subject rights, including data access, rectification, and erasure (right to be forgotten).</p>\n\n<p>A detailed audit trail of user activities, including login attempts, password changes, and data access, shall be maintained, along with continuous monitoring for potential security threats. Access control measures shall be implemented within the HRMS, enforcing role-based restrictions on specific modules and data based on user roles and responsibilities. Administrators will have the necessary authority to grant, revoke, or modify user access rights as required.</p>\n\n<p>Employee data should be securely stored in a centralized database, protected against unauthorized access or tampering. The system shall incorporate mechanisms to prevent common security risks or OWASP top ten vulnerabilities, such as SQL injection attacks. All communications between the user&#39;s browser and the HRMS shall be encrypted using HTTPS to prevent eavesdropping and man-in-the-middle attacks. Additionally, the HRMS should implement secure session management to prevent session hijacking and enforce session timeouts after a period of inactivity. The system should allow to perform regular data backups to ensure data integrity and facilitate data recovery in case of system failures or data loss.</p>\n\n<ol>\n\t<li><strong>Environmental</strong></li>\n</ol>\n\n<p>These factors concern the software&rsquo;s environment in terms of how long it should be operational and what external factors might affect it.</p>\n\n<ol>\n\t<li><strong>Data integrity</strong></li>\n</ol>\n\n<p>Data integrity refers to maintaining and assuring data accuracy and consistency over its entire lifecycle. If this factor is corrupted, data is lost due to a database error.</p>\n\n<ol>\n\t<li><strong>Interoperability</strong></li>\n</ol>\n\n<p>All system components must follow a common and standard set of exchange formats to exchange data. It is essential to follow standards in order to ensure interoperability.</p>\n\n<ol>\n\t<li><strong>Usability&nbsp;</strong></li>\n</ol>\n\n<p>This feature concerns the users as it indicates how effectively they can learn and use a system. It defines how difficult it will be for a user to learn and operate the system. Usability can be assessed from different points of view such as the level of user friendliness and ease of use of the system or how simple it is to understand the interface, buttons and headings.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Scalability </strong></li>\n</ol>\n\n<p>The robustness or the elasticity of a system is a major quality to be considered.</p>\n\n<p>Failing to meet non-functional requirements will cause users dissatisfaction and will ultimately lead the system to fail in the market.</p>\n\n<ul>\n\t<li><strong>Seamless Integrability</strong></li>\n</ul>\n\n<p>This is a very critical feature in any system as it facilitates the integration of multiple IT components to work seamlessly together.&nbsp;Since COMESA Secretariat uses the sun system to process payment, the integration of the two systems is a must. The HRMS should also be able to integrate with other systems such as time and attendance, document management systems, workflow and Business Intelligence. It should provide standardized interfaces (APIs) or support industry-standard integration protocols to facilitate data exchange and interoperability.</p>\n\n<ol>\n\t<li><strong>Compliance</strong></li>\n</ol>\n\n<p>The HRMS should adhere to relevant legal and regulatory requirements, such as data protection and privacy regulations (e.g., GDPR) and employment law. It should support features and controls to ensure compliance, such as data retention policies, audit trails, and consent management.</p>\n\n<ol>\n\t<li><strong>Mobile Compatibility </strong></li>\n</ol>\n\n<p>HRMS should be accessible and functional on mobile devices, allowing users to perform essential tasks on smartphones or tablets. The user interface should be responsive and optimized for mobile screens, enabling employees and managers to access HR information on the go.</p>\n\n<ol>\n\t<li><strong>Project Deliverables</strong></li>\n</ol>\n\n<p>The following mandatory deliverables should be provided:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p><strong>Details</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Project Management Plan and Project Documents</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The project management plan shall cover the following aspects:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Project approach and organization</li>\n\t\t\t\t<li>Requirement Management</li>\n\t\t\t\t<li>Scope Management</li>\n\t\t\t\t<li>Schedule Management</li>\n\t\t\t\t<li>Deliverable Plan</li>\n\t\t\t\t<li>Configuration management</li>\n\t\t\t\t<li>Quality Management</li>\n\t\t\t\t<li>Risk Management</li>\n\t\t\t\t<li>Change management, communication, and training plan</li>\n\t\t\t\t<li>Go-Live Plan</li>\n\t\t\t\t<li>Warranty service plan</li>\n\t\t\t</ol>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>The supplier shall update the project plan at the end of each project phases. Furthermore, the supplier is expected to provide regular weekly progress reports or as specified by COMESA project steering committee.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>2.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The solution blueprint shall cover all the functional, technical, migration and security requirements as well as the system architecture of the proposed solution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Training</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Training for business users as well as Administration training for IT department and IT Auditor. A comprehensive user manuals and Administrator manual for each module configured shall be delivered.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>User Acceptance Test Document</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Bidder should submit the UAT test scripts and ensure that all the UAT scenarios are catered for the requirements expressed by the users. The UAT exercise should consist of different rounds of testing. The bidder should ensure that a full-fledged testing has been carried out prior to UAT.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>5.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>A fully operational and bug free efficient system as per requirement</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The supplier shall provide a fully operational and bug free system prior to Go-Live. The following will have to be addressed to the satisfaction of the users prior to Go-Live of the system:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>All requirements of the users (including IT Security requirements) have been catered for in the Application Software.</li>\n\t\t\t\t<li>All identified scenarios are fully and comprehensively tested during each round of UAT.</li>\n\t\t\t\t<li>All bugs identified during UAT have been dealt with.</li>\n\t\t\t\t<li>Trainings on System Administration and Application Software have been delivered.</li>\n\t\t\t\t<li>All documentations are provided</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Commissioning report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The commissioning report shall include among others:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>The level of customization for each module configured</li>\n\t\t\t\t<li>System setup document</li>\n\t\t\t\t<li>Security Policies</li>\n\t\t\t</ol>\n\n\t\t\t<p>The sign-off shall be done at the end of the operational acceptance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Warranty Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The bidder shall provide all the terms and condition of the warranty.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>7.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Support Agreement</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The bidder shall provide all the terms and condition of the support. Furthermore, the bidder should provide a monthly progress report on maintenance &amp; support activities and a periodic SLA performance report.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Other Requirements</strong></li>\n</ol>\n\n<ol>\n\t<li>The vendor is required to sign a Non-Disclosure Agreement (NDA).</li>\n\t<li>The system should support multilingual.</li>\n\t<li>The HRMS shall be developed using the latest and most up-to-date technologies and frameworks.</li>\n\t<li>The security features of the system shall meet industry standards and best practices.</li>\n</ol>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Payment Terms </strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The structure of payment shall be as follows:</p>\n\n<ol>\n\t<li><strong>Implementation Services</strong></li>\n</ol>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p><strong>S.N</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p><strong>Payment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Inception Report with agreed project implementation plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Detailed Software Requirements Specifications</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Solution Prototype based on the Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Go-live</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<ol>\n\t<li><strong>Support Services</strong></li>\n</ol>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p><strong>S.N</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p><strong>Payment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>12 Months post go-live Warranty</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>0%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>Annual Maintenance Contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>25% per quarter</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>Bidders shall give a breakdown of the prices as per below Bill of Quantity:</p>\n\n<table border=\"1\" cellspacing=\"0\" style=\"width:467.5pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p><strong>Items</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p><strong>Qty</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p><strong>Unit</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p><strong>Amount (USD)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Implementation of HCM Modules (Recruitment and Selection, Onboarding, Human Resource, Training &amp; Development, Leave Management, Performance Management, Time &amp; Attendance, Employee Self-service) &amp; Interfaces including 1 year full warranty.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Implementation of Payroll module, Self-Services &amp; Interfaces including 1 year full warranty.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Reports and Analytics Module</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Training on HCM Modules</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>Training on Payroll module</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>1 Year Full Maintenance &ndash; HCM Modules</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:233.75pt\">\n\t\t\t<p>1 Year Full Maintenance &ndash; Payroll Modules</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:49.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:67.35pt\">\n\t\t\t<p>Lot</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:116.9pt\">\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Project Approach, Methodology &amp; Governance</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>The bidder is expected to describe how the firm intends to manage all aspects of the work to be performed, including schedules for completion of tasks/subtasks, procedures for scheduling and cost control.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Testing, Quality Assurance &amp; Change Management</strong></li>\n\t</ol>\n\t</li>\n\t<li><strong>Testing and UAT</strong></li>\n</ol>\n\n<p>The supplier should commit to submit Unit Test Plans, System Test Plans, Integration Test Plans, Load and Stress Test Plan. The Test Results should be submitted to COMESA as evidence of full-fledged testing carried out prior to UAT.</p>\n\n<p>The supplier should submit UAT test scripts to ensure that the UAT scenarios cater for all the requirements expressed by the users. A comprehensive user manual should be made available before the training.</p>\n\n<p>&nbsp;</p>\n\n<p>The UAT exercise should consist of different rounds of testing as follows:</p>\n\n<ol>\n\t<li>Round 1 should consist of executing all the test scenarios business flow wise and identify list of issues if any by the users</li>\n\t<li>Bidder should commit to ensure that issues identified in Round 1 are fully addressed to the satisfaction of the users prior to starting the next round (Round 2)</li>\n\t<li>Bidder should also commit to producing evidence that that non-regression testing has been performed prior to starting next round,</li>\n\t<li>Subsequent rounds are conducted until no further issues are identified.</li>\n</ol>\n\n<ol>\n\t<li><strong>Quality Assurance Plan</strong></li>\n</ol>\n\n<p>The bidder shall provide a proper Quality Assurance plan to ensure the success of project.&nbsp; The bidder should ensure that all work products are evaluated and that evidence is provided to the fact that:</p>\n\n<ol>\n\t<li>It conforms to specified requirements.</li>\n\t<li>It has been produced according to the project standards and processes.</li>\n</ol>\n\n<ol>\n\t<li><strong>Change Management </strong></li>\n</ol>\n\n<p>As the implementation and adoption of business process changes will be vital to the success of the project, the consultant should be able to explain and communicate business process changes and their associated requirements to individuals throughout the COMESA including to executive managers, division heads, subject matter experts, and end-users. The consultant shall provide guidance and mentor the project core team to successfully implement the overall business transformation and system changes for the COMESA.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Project Timeline</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>Based upon the proposed project approach and work plan, provide a Project Gantt chart detailing the project schedule, phase, task and subtask duration, proposed phasing for roll-out of proposed system and highlight key milestone dates that illustrates the duration of tasks listed in the scope of work and identifies results and deliverable milestones.</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Company Profile and Profile of Consultants</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>A company profile of the Bidder as well as a list of staff that would be involved in the project and their respective qualifications and experience should be provided.</p>\n\n<p>In this respect, Bidders are required to submit information on reference sites and staff profiles as per format at Annex II</p>\n\n<p>COMESA shall be notified in writing of any change or replacement of staff being assigned on the project as per their response of the bidding document. Respective qualifications and experience of any new staff joining the implementation team should be provided. COMESA reserves the right to approve any such change.</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li>\n\t<ol>\n\t\t<li><strong>Customer References</strong></li>\n\t</ol>\n\t</li>\n</ol>\n\n<p>To be eligible for this exercise, bidders should have at least three (3) reference sites where they have successfully implemented a similar project.</p>\n\n<ol>\n\t<li><strong>Annexes</strong></li>\n</ol>\n\n<p><strong>Annex 1: Team Composition Template</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"6\" style=\"vertical-align:top; width:467.5pt\">\n\t\t\t<p><strong>Table 1: Work Assignment and Manpower Input in Man Months</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:28.1pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:127.7pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.65pt; vertical-align:top; width:233.8pt\">\n\t\t\t<p><strong>Manpower Input in Months</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Remote</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>On-Site</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>John Doe</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Project Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Jane Doe</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>0</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p><strong>Annex 2: Individual Team Profiles&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<table cellspacing=\"0\" style=\"width:493.3pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#0070c0; height:21.95pt; width:493.3pt\">\n\t\t\t<p><strong>Curriculum Vitae: Expert 1</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Role in the Project</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Role X</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Expert 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Date of Birth</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Dd/mm/yyyy</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Nationality</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>XXXX</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Degree</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>College</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Year</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Bacheleor of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2002</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Master of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2010</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Professional Certifications</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Certification </strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>Body and Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Status</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Active</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Expired</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Expert Profile Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Work Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>No</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p><strong>Employer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p><strong>From</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>To</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Experience Related to Current Assignment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Project Client</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Client Name</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Responsibilities in the project</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Technologies Used</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Technology 1, Technology 2, Technology N</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>Sign</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:202.6pt\">\n\t\t\t<p>Expert Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>Date</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>00/00/00</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>"},{"id":"OP00280715","notice_type":"Request for Expression of Interest","noticedate":"21-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-04-19T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Eastern and Southern Africa","project_id":"P171967","project_name":"Regional Infrastructure Finance Facility (RIFF) Project","bid_reference_no":"ZM-COMESA -394071-CS-LCS","bid_description":"Planning and Budgeting System","procurement_group":"CS","procurement_method_code":"LCS","procurement_method_name":"Least Cost Selection","contact_address":"Ben Bella Road, P. O. Box 30051, Lusaka","contact_ctry_name":"Zambia","contact_email":"jmutale@comesa.int","contact_name":"Mohamed Kheir  Elginaid","contact_organization":"COMESA  SECRETARIAT","contact_phone_no":"+260979413591","submission_date":"2024-03-21T00:00:00Z","notice_text":"<p><strong>COMMON MARKET FOR EASTERN AND</strong></p>\n\n<p>SOUTHERN AFRICA</p>\n\n<p>&nbsp;</p>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p><strong>السوق المشتركة للشرق والجنوب الأفريقى</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<table style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td>\n\t\t\t<p>MARCHE COMMUN</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>REQUEST FOR EXPRESSION OF INTEREST</strong></p>\n\n<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (FIRM SELECTION)</strong></p>\n\n<p><strong>NAME OF PROJECT</strong><strong>:</strong><strong> REGIONAL INFRASTRUCTURE FINANCE FACILITY &nbsp;&nbsp;</strong></p>\n\n<p><strong>&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;(RIFF) PROJECT</strong></p>\n\n<p><strong>GRANT NO: D6780-3A</strong></p>\n\n<p><strong>ASSIGNMENT TITLE: PROCUREMENT OF A PLANNING &amp; BUDGETING SYSTEM </strong></p>\n\n<p><strong>ISD No. &nbsp;REFERENCE No. ZM-COMESA -394071-CS-LCS</strong></p>\n\n<p><strong>ISSUED ON</strong><strong> : 21&nbsp; MARCH 2024</strong></p>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) received a grant from the World Bank towards the implementation of the Regional Infrastructure Finance Facility project and intends to apply a portion of the proceeds of this grant to eligible payments under the contract&nbsp; for the procurement of&nbsp; a planning&nbsp; and budgeting system.</p>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased co-operation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>COMESA Secretariat prepares and submits an annual work programme and budget for&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; consideration and approval of the COMESA Council of Ministers. The annual budget incorporates the approved Member States contributions and grants for implementation of the annual work programme and is analyzed based on various cost centers. The work programme incorporates the activities, budget, expected results and timeline for a particular focus area. Each division and unit are required to prepare and submit a costed work programme in line with its mandate, following which the work programmes and budget proposals are consolidated.</p>\n\n<p>The current Planning and Budgeting process at COMESA is manual. Ms-Excel templates are provided to programme and budget holders to capture planning and budgeting information, which are then submitted to Budget and Finance Division for rationalization and consolidation.</p>\n\n<p>The COMESA wish to procure a digital Planning and Budgeting system to digitize the current&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; manual preparation and consolidation of the work programme and budget by various Units and Divisions of the Secretariat</p>\n\n<p>It is expected that a digital Planning and Budgeting system at COMESA&nbsp; Secretariat&nbsp; will resolve the following:</p>\n\n<ol>\n\t<li><strong>Processes:</strong> Manual processes should be automated to achieve effectiveness and efficiency</li>\n\t<li><strong>Accessibility:</strong> Staff should be able to access the planning and budgeting system anytime and from anywhere.</li>\n\t<li><strong>Integration:</strong> The application should be able to fully integrate with current and future relevant application systems.</li>\n\t<li><strong>Data Integrity and Security:</strong>&nbsp; Data Integrity and Security should be enhanced through proper access controls and other electronic means. The manual system does not adequately protect information assets.&nbsp;&nbsp;</li>\n\t<li><strong>Scalability:</strong> All applications/systems at COMESA should be able to accommodate new features/modules to meet the changing organization needs</li>\n\t<li><strong>Currency:</strong> the system shall support multi-currency budgeting and reporting. It should be able to provide consolidated reports in the base currency.</li>\n</ol>\n\n<p>vii<strong>&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Reports:</strong> Current manual system does not address all stakeholders reporting needs.</p>\n\n<p>&nbsp;</p>\n\n<p><strong>The detailed Terms of Reference (TOR) for the assignment are attached to this request for Expressions of Interest (EOI).</strong></p>\n\n<p>The Common Market for Eastern and Southern Africa now invites eligible consultants (firms) to indicate their interest in providing these services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, core business and not less than 10 years in business, experience in similar conditions, relevant experience, technical and managerial capability of the firm, etc). Consultants may constitute joint ventures to enhance their chances of qualification. &nbsp;In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p>\n\n<p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; &nbsp;November &nbsp;2020 setting forth the World Bank&rsquo;s policy on conflict of interest.</p>\n\n<p><strong>&nbsp;SUBMISSION</strong></p>\n\n<p>Expressions of interest must be submitted &nbsp;in written&nbsp; to the following email address;</p>\n\n<p>Tenders@comesa.int copy procurement@comesa.int</p>\n\n<p><strong>ASSIGNMENT TITLE:</strong><strong>PROCUREMENT OF A PLANNING &amp; BUDGETING SYSTEM </strong></p>\n\n<p><strong>REFERENCE No.</strong><strong> ZM-COMESA -394071-CS-LCS</strong></p>\n\n<p>ATT:THE&nbsp;HEAD&nbsp;OF&nbsp;PROCUREMENT,COMESA&nbsp;SECRETARIAT,BEN&nbsp;BELLA ROAD,LUSAKA, ZAMBIA</p>\n\n<p>&nbsp;&nbsp;<strong>&nbsp;CLOSING DATE FOR SUBMISSION</strong></p>\n\n<p>The Closing date for receipt of Expression of Interest is &nbsp;19th April 2024 <strong><em>at 10:00 hours&nbsp; Central Africa Time (CAT) </em></strong></p>\n\n<p>Further information can be obtained at the address below during office hours, &nbsp;09 00 - &nbsp;1700hours Central Africa Time (CAT) &nbsp;to the following address.</p>\n\n<p>COMESA Secretariat,Ben Bella Road&nbsp; Lusaka, Zambia</p>\n\n<p>Email address:&nbsp; Procurement comesa.int.</p>\n\n<p><strong>NB: Physical submission of EOIs shall &nbsp;not be accepted.</strong></p>\n\n<p><strong>ATTACHMENT 1: TERMS OF REFERENCE</strong></p>\n\n<ol>\n\t<li><strong>Background</strong></li>\n</ol>\n\n<p>The Common Market for Eastern and Southern Africa (COMESA) is a regional grouping of 21 African States which have agreed to promote regional integration through trade development and transport facilitation. COMESA&#39;s objectives include sustainable economic development through economic and social progress in all Member States through increased co-operation and integration in all fields of development particularly in Trade, Customs and Monetary Affairs, Transport, Communication and Information Technology, Industry and Agriculture, Energy, Environment and Natural Resources including Gender and Social Development. The Secretariat is based in Lusaka, Zambia.</p>\n\n<p>COMESA Secretariat prepares and submits an annual work programme and budget for&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; consideration and approval of the COMESA Council of Ministers. The annual budget incorporates the &nbsp;&nbsp;approved Member States contributions and grants for implementation of the annual work programme and is analyzed based on various cost centres. The work programme incorporates the activities, budget, expected results and timeline for a particular focus area. Each division and unit are required to prepare and submit a costed work programme in line with its mandate, following which the work programmes and budget proposals are consolidated.</p>\n\n<p>The current Planning and Budgeting process at COMESA is manual. Ms Excel templates are provided to programme and budget holders to capture planning and budgeting information, which are then submitted to Budget and Finance Division for rationalization and consolidation.</p>\n\n<p>The COMESA wish to procure a digital Planning and Budgeting system to digitize the current&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; manual preparation and consolidation of the work programme and budget by various Units and Divisions of the Secretariat</p>\n\n<p>It is expected that a digital Planning and Budgeting system at COMESA &nbsp;Secretariat &nbsp;will resolve the following:</p>\n\n<ul>\n\t<li><strong>Processes:</strong> Manual processes should be automated to achieve effectiveness and efficiency</li>\n\t<li><strong>Accessibility:</strong> Staff should be able to access the planning and budgeting system anytime and from anywhere.</li>\n\t<li><strong>Integration:</strong> The application should be able to fully integrate with current and future relevant application systems.</li>\n\t<li><strong>Data Integrity and Security:</strong>&nbsp; Data Integrity and Security should be enhanced through proper access controls and other electronic means. The manual system does not adequately protect information assets.&nbsp;&nbsp;</li>\n\t<li><strong>Scalability:</strong> All applications/systems at COMESA should be able to accommodate new features/modules to meet the changing organization needs</li>\n\t<li><strong>Currency:</strong> the system shall support multi-currency budgeting and reporting. It should be able to provide consolidated reports in the base currency.</li>\n</ul>\n\n<ul>\n\t<li><strong>Reports:</strong> Current manual system does not address all stakeholders reporting needs.</li>\n</ul>\n\n<ol>\n\t<li><strong>Objectives of the System</strong></li>\n</ol>\n\n<p>The main objectives of the project are to:</p>\n\n<ul>\n\t<li>To implement an integrated planning and budgeting system to automate and optimize planning and budgeting processes.</li>\n\t<li>To improve data visibility, accuracy, and accessibility for all stakeholders.</li>\n\t<li>To enhance decision-making capabilities through the availability of real-time Planning and Budgeting analytics and reporting.</li>\n\t<li>To increase stakeholders&rsquo; satisfaction and engagement through self-service functionalities and improved communication channels.</li>\n\t<li>To ensure compliance with relevant organizational policies.</li>\n\t<li>To enhance efficiency and reduce back-office interventions thus increasing COMESA&rsquo;s performance and reducing costs.</li>\n\t<li>To facilitate remote work ensuring system accessibility at anytime and anywhere.&nbsp; In addition, all relevant stakeholders should be able to access planning and budgeting information via a friendly self-service portal.&nbsp;</li>\n\t<li>To fortify security measures, ensuring the confidential&nbsp;protection and control of planning &amp; budgeting data and information consistently</li>\n</ul>\n\n<ol>\n\t<li><strong>Scope of Work</strong></li>\n</ol>\n\n<p>The scope of work of the project is as follows:</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Design, Development, and Implementation of a new Planning and Budgeting System</strong><strong>:</strong> The vendor is expected to design, develop, and implement a comprehensive suite of tools for the management of Planning and Budgeting activities, including reporting functionalities.</li>\n\t<li><strong>Integration:</strong> The application should be fully integrated with the Sun Accounting System version 6.4, Monitoring &amp; Evaluation System, E-Procurement system, Human Resource Management System, Document Management System, workflow management system any future application systems developed by COMESA.</li>\n\t<li><strong>Migration of Data:</strong> The vendor should provide an effective and efficient data migration approach of all existing data from the current manual system to the configured environment. The successful vendor will be expected to provide full support to the COMESA during the data migration phases, including the identification and resolution of data quality issues.</li>\n\t<li><strong>Training &amp; Knowledge Transfer:</strong> The vendor shall provide a detailed training and change management plan to ensure proper knowledge transfer to the business users as well as the IT Administrators. The vendor shall provide specific training programme for:\n\t<ul>\n\t\t<li>Business users to continue operational responsibility for the delivered solution.</li>\n\t\t<li>IT staff to enable first line support to users and for the proper administration of the delivered solution.</li>\n\t\t<li>Business users and IT staff to create and eventually customize reports/dashboards using the proposed reporting tools.</li>\n\t\t<li>Business users and IT staff who perform basic administration tasks like creating users, assign roles to users and de-activate users.</li>\n\t\t<li>Business users to adopt operational changes that may arise due to the implementation of the new system for seamless uptake.</li>\n\t</ul>\n\t</li>\n\t<li><strong>Documentation:</strong> The successful vendor will be required to provide a comprehensive set of documentation regarding the application system including the solution blueprint, system manual, installation manual and user manual.</li>\n\t<li><strong>Post implementation support:</strong> The Vendor should provide a minimum of three (3) months on-site post implementation support after successful Go-Live of the system.</li>\n\t<li><strong>Warranty:</strong> The warranty period should be for a period of 12 months, effective immediately after the expiry of the on-site post implementation support period. The warranty shall cover all configurations and functions as stated in the scope of work for corrective maintenance.</li>\n\t<li><strong>Support and Maintenance after warranty period:</strong> The vendor shall submit their support and maintenance costs related to support over the next two (2) years after the warranty period, based on an agreed Service Level Agreement (SLA) (8x5). The support shall cover among others: troubleshooting/bug fixing, patch management, fine-tuning and health checks. The vendor should also provide the response time to blocking/non-blocking issues as well as their rates on an hourly basis for any intervention that is not covered under SLA. COMESA reserves the right to proceed with award and renewal of the Maintenance agreement.</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Functional Requirements</strong></li>\n</ol>\n\n<p>An Integrated Planning &amp; Budgeting Application software should provide the COMESA Secretariat with a single window platform and a repository for an up-to-date consolidated version of information concerning organisation performance. It will give all users an access to planning &amp; budgeting information and enhance the budget performance reporting. It is expected to significantly improve the way of managing planning and budgeting, sharing of information to different stakeholders, automated budget performance reporting, and statistical data within a secured environment.</p>\n\n<p>The proposed system architecture for an integrated Planning and Budgeting system is as below:</p>\n\n<p>The software will comprise of the following modules:</p>\n\n<ul>\n\t<li><strong>Informative Portal</strong></li>\n</ul>\n\n<p>The informative portal will be accessible to COMESA staff and other stakeholders and will be a single source of information for all COMESA internal policies, guidelines, procedures and processes with regard to planning, budgeting, procurement, monitoring and evaluation. Staff will be able to access information for current and past years. The informative portal should include Online Helpdesk/ Customer Support facilities like Chatbots (AI features) for Frequently Asked Question (FAQ).</p>\n\n<ul>\n\t<li><strong>Core Planning and Budgeting Software</strong></li>\n</ul>\n\n<p>The core Planning and Budgeting software will cater for the following activities:</p>\n\n<ul>\n\t<li>Divisions and Units &ndash; Identify and plan activities that will be undertaken each year based on the Medium strategic plan, past performance, Council decisions and emerging economic trends.</li>\n\t<li>Strategic Planning &ndash; aligns Divisional and Unit work plans to the approved medium term strategic plan, Council decisions, emerging economic trends, Monitoring and Evaluation Indicators.</li>\n\t<li>Assistant Secretary General (Programme) &ndash; to validate the activities and programmes and to recommend for costing. During work programme implementation, approve quarterly and individual aide memoires.</li>\n\t<li>Budget and Finance &ndash; undertake costing and rationalization of the planned activities and programmes on the basis of actual pricing standard costing rates and budget ceiling as provided by council and/or guided by organization. During budget implementation, recommend for approval of budgets at activity level and also recommend for approval quarterly and individual aide memoires for Units and Divisions.</li>\n\t<li>Assistant Secretary General (Admin &amp; Finance) - to review and recommends approval of the budget. During budget implementation, approve budgets at activity level quarterly and individual aide memoires for Units and Divisions under supervision.</li>\n\t<li>Secretary General &ndash; reviews and approves the organization wide work programme and budget for submission to Council upon the recommendations of the Assistant Secretary General (Admin &amp; Finance). During work programme implementation, approve quarterly and individual aide memoires for Units and Divisions under supervision.</li>\n\t<li>Council &ndash; Approves the organization wide work programme and budget after the review and recommendation of the Audit and Budget Committee, Administrative and Budgetary Committee and the Inter-Governmental Committee.</li>\n</ul>\n\n<p>The system should internal stakeholders namely &nbsp;authorized users from &nbsp;Divisions/Units and executive management &nbsp;&nbsp;&nbsp;to undertake the above outlined tasks in a consistent and standardized manner while accommodating the following limitations:</p>\n\n<ul>\n\t<li>Member States annual contributions: year-on-year increase is capped at 5%; and</li>\n\t<li>Cooperating Partner contributions are set within the agreements with COMESA.</li>\n</ul>\n\n<p>During budget implementation the system should allow budget reallocation, &nbsp;reassignment based on the organisation requirements and also allow budget rollover for extra budgetary resources and budget savings for member states. Provision should be given for budgeting and reporting on in kind contribution.</p>\n\n<p>The system should include a module that will capture staff budget for consolidation in the overall budget.</p>\n\n<ul>\n\t<li><strong>Workflow</strong></li>\n</ul>\n\n<p>The automated workflow will allow COMESA users to have a single view of planning and budgeting. Assignment of tasks will be automated to streamline processes. The system will also automatically generate mails to convey the assigner and assignee of the assignment operation.</p>\n\n<ul>\n\t<li><strong>Integration</strong></li>\n</ul>\n\n<ul>\n\t<li><strong>Integration with sun accounting system</strong></li>\n</ul>\n\n<p>The financial management of the Secretariat is undertaken through the sun accounting system version 6.4. The planning and budgeting system should therefore integrate with the accounting system for mining of expenditures for reporting of budget performance and controlling budget spent as per the approved budget items.</p>\n\n<ul>\n\t<li><strong>Integration with the Monitoring and Evaluation System</strong></li>\n</ul>\n\n<p>The Planning and Budgeting System&nbsp; should be&nbsp; integrated with the Monitoring and Evaluation System which will assist in the implementation of&nbsp; the annual work programme.</p>\n\n<ul>\n\t<li><strong>Integration with the Document Management System</strong></li>\n</ul>\n\n<p>The system will be integrated with the Document Management System for the tracking and approvals of documents related to planning and budgeting.</p>\n\n<ul>\n\t<li><strong>Integration with E-Signature</strong></li>\n</ul>\n\n<p>The system will be integrated E-Signature for the signature of documents related to planning and budgeting.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>Integration of Procurement</strong></li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>The system shall automatically generate the annual procurement plan and update the E- Procurement system.</p>\n\n<ul>\n\t<li>\n\t<ul>\n\t\t<li><strong>Integration with HR System</strong></li>\n\t</ul>\n\t</li>\n</ul>\n\n<p>The system shall be integrated with the HR system to provide up-to-date employee management information.</p>\n\n<ul>\n\t<li><strong>Reports and Business Intelligence </strong></li>\n</ul>\n\n<p>The planning and budgeting system should be integrated with a flexible management reporting tool with data extraction in various formats such as MS Word, PDF or MS Excel and includes drilling capabilities. It should include interactive dashboards and highly formatted reporting. Users should be able to design their own reports and generate them in a wide range of formats including listing, charts, and pivot tables.&nbsp; Users should be able to access data at different levels of granularity in a single report itself.</p>\n\n<p>The objective of the Business Intelligence module is to facilitate decision-making by the Head of the Division and Executive Management.</p>\n\n<ol>\n\t<li><strong>Non-functional Requirements</strong></li>\n</ol>\n\n<p>The non-functional requirements for the Planning and Budgeting system are as follows:</p>\n\n<ul>\n\t<li><strong>User interface </strong></li>\n</ul>\n\n<p>The user interface is key to application usability. The System should include content presentation, application navigation, and user assistance.</p>\n\n<ul>\n\t<li><strong>Role-based User Groups</strong></li>\n</ul>\n\n<p>The system must provide users with screens focusing on their roles (minimizing clutter).</p>\n\n<ul>\n\t<li><strong>Dynamic content presentation</strong></li>\n</ul>\n\n<p>Users should be provided with in data presentation. The system should allow users to select appropriate settings and property values on display options that fits their preferences, e.g., choice of whether data appears in a grid, a chart, or a grid/chart combination.</p>\n\n<ul>\n\t<li><strong>User assistance</strong></li>\n</ul>\n\n<p>The system should provide online help that includes comprehensive instructions on using each feature. The users should be provided with default mechanisms for accessing help pages e.g., by clicking the question mark icon across all the screens or a distinct menu Help &gt; Help... menu option in the menu bar. A link to a comprehensive help resource should be provided in various formats e.g., Wiki, PDF etc.</p>\n\n<ul>\n\t<li><strong>User navigation</strong></li>\n</ul>\n\n<p>The system should provide a simple traceable navigation of the entire system with options clearly showing the users where they are and how they can navigate away from the current screens and consequences of doing so.</p>\n\n<ul>\n\t<li><strong>Saving users&rsquo; work</strong></li>\n</ul>\n\n<p>The system should provide users performing data manipulation tasks to save their work at a certain point or make a particular view of the data available to other users.</p>\n\n<ul>\n\t<li><strong>Branding guide</strong></li>\n</ul>\n\n<p>The system interface design will adhere to the COMESA branding guide which shall be provided.</p>\n\n<ul>\n\t<li><strong>Hardware Requirements</strong></li>\n</ul>\n\n<p>The supplier shall provide the hardware appropriate for the proper running of the application.</p>\n\n<ul>\n\t<li><strong>Hardware interface requirements</strong></li>\n</ul>\n\n<p>All server-side components must execute on server-class computers. All client-side components must execute on workstation-class and personal-class computers.</p>\n\n<ul>\n\t<li><strong>Communication interface requirements</strong></li>\n</ul>\n\n<ul>\n\t<li><strong>Web browser:</strong> The system must provide an option to be accessed via the internet using the latest browsers e.g., Chrome, Edge, Mozilla, Safari with backward compatibility support to 2 versions of the browsers.</li>\n</ul>\n\n<p>Note: in a scenario where the system uses third party plugins to run, this must be stated in advance for information security tests and clearance.</p>\n\n<ul>\n\t<li><strong>Communication standards and Network server communications protocols: </strong>All communications between the server components and user interactions must be encrypted to safeguard user and data privacy. Only secure protocols shall be permitted e.g., HTTPS, FTPS with appropriate authentication and authorization mechanisms.</li>\n\t<li><strong>Electronic forms: </strong>the system must provide interfaces using electronic forms either on the browser or client application. The forms must be secured.</li>\n\t<li><strong>Data transfer rates: </strong>The system must provide appropriate data transfer rates that shall be agreed upon meeting performance requirements.</li>\n\t<li><strong>E-mail: </strong>the system must provide communication mechanisms with various stakeholders or user groups within the system. This can be achieved via forms that create support tickets or defined emails on the COMESA (comesa.int) domain.</li>\n</ul>\n\n<ul>\n\t<li><strong>Communication security or encryption</strong></li>\n</ul>\n\n<p>End to end encryption must be provided in all the interactions in the system e.g., chat facilities, web browsers, mobile apps etc.</p>\n\n<ul>\n\t<li><strong>Performance</strong></li>\n</ul>\n\n<p>The system should be responsive and perform efficiently, even with many users and data. It should have acceptable response times for tasks such as employee data retrieval, report generation, and system updates. System performance is the most important quality in non-functional requirements and affects almost all the other preceding ones. A stress test is to be performed by the vendor once the system is commissioned.</p>\n\n<ul>\n\t<li><strong>Availability</strong></li>\n</ul>\n\n<p>The system should be designed to minimize downtime through robust error handling, fault tolerance, and backup and recovery mechanisms. It should also have appropriate monitoring and alerting capabilities to identify and address potential issues proactively.</p>\n\n<ul>\n\t<li><strong>Recoverability</strong></li>\n</ul>\n\n<p>The system should be designed to recover quickly from a crash or a failure in the system and return to full operation.</p>\n\n<ul>\n\t<li><strong>Security</strong></li>\n</ul>\n\n<p>The system shall provide security measures based on best practices and international standards. Some security features may include encryption of data on database and web services, implementation using HTTPS, only authorized users are able to access the system via an authentication mechanism and Role based access.</p>\n\n<ul>\n\t<li><strong>Interoperability</strong></li>\n</ul>\n\n<p>All system components must follow a common and standard set of exchange formats to exchange data.</p>\n\n<ul>\n\t<li><strong>Scalability </strong></li>\n</ul>\n\n<p>The design should be scalable to provide for future business needs.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Seamless Integration</strong></li>\n</ul>\n\n<p>The system should also be able to integrate with other systems such as Sun Financial system, M&amp; E system, document management systems, workflow and Business Intelligence. It should provide standardized interfaces (APIs) or support industry-standard integration protocols to facilitate data exchange and interoperability.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Compliance</strong></li>\n</ul>\n\n<p>The system should adhere to relevant legal and regulatory requirements, such as data protection and privacy regulations (e.g., GDPR) and employment law. It should support features and controls to ensure compliance, such as data retention policies, audit trails, and consent management.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>&nbsp;Mobile Compatibility </strong></li>\n</ul>\n\n<p>The system should be accessible and functional on mobile devices, allowing users to perform essential tasks on smartphones or tablets. The user interface should be responsive and optimized for mobile screens, enabling employees and managers to access information on the go.</p>\n\n<p>&nbsp;</p>\n\n<ul>\n\t<li><strong>Technology </strong></li>\n</ul>\n\n<p>The system shall be developed/customize on the latest version of technology stack. The supplier shall provide the system architecture and development platform of the proposed solution.</p>\n\n<ol>\n\t<li><strong>Project Team</strong></li>\n</ol>\n\n<p>A project committee will be setup to provide governance, oversight, and strategic guidance for the project. The committee serves as a central decision-making body, ensuring that the project aligns with the overall goals and objectives of the organization. The project committee will comprise of the following members:</p>\n\n<ul>\n\t<li>Director - Budget and Finance</li>\n\t<li>Director &ndash; Human Resource and Administration</li>\n\t<li>Director - Information Communications Technology (ICT)</li>\n\t<li>Project Manager</li>\n\t<li>Finance Officer</li>\n\t<li>Head of M&amp;E</li>\n\t<li>Head of Strategic Planning</li>\n\t<li>Organisational Development Expert</li>\n\t<li>Functional Leads (Planning and Budgeting)</li>\n\t<li>Planning and Budgeting Implementation Consultants</li>\n\t<li>End-users representatives from various departments</li>\n</ul>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Timeline</strong></li>\n</ol>\n\n<p><strong>The Planning &amp; Budgeting system implementation project is anticipated to span for 18 months after the vendor selection and contract negotiation, which will cover a period of 3 months. The actual Project implementation timelines are as follows: </strong></p>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:#d0cece; width:31.5pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0cece; width:223.8pt\">\n\t\t\t<p><strong>Activity</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#d0cece; width:149.7pt\">\n\t\t\t<p><strong>Timeline</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Planning and requirements gathering</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/06/2024 to 15/07/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>System customization and configuration</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>16/07/2024 to 31/10/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Data migration and testing</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/11/2024 to 13/12/2024</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Training and user acceptance testing</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/03/2025 to 31/05/2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:31.5pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:223.8pt\">\n\t\t\t<p>Rollout and post-implementation support</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:149.7pt\">\n\t\t\t<p>01/06/2025 to 20/09/2025</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Implementation Plan</strong></li>\n</ol>\n\n<p>The vendor shall provide a project Grant chart detailing the project schedule, phase, task and subtask duration, proposed phasing for roll-out of proposed system and highlight key milestone dates that illustrates the duration of tasks listed in the scope of work and identifies results and deliverable milestone. The proposed Grant chart should be based upon the proposed project approach and timeline.</p>\n\n<ol>\n\t<li><strong>Project Approach, Methodology and Governance</strong></li>\n</ol>\n\n<p>The vendor is expected to describe how the firm intends to manage all aspects of the work to be performed, including schedules for completion of tasks/subtasks, procedures for scheduling and cost control.</p>\n\n<p><strong>9.1 Testing and UAT</strong></p>\n\n<p>The vendor should commit to submit Unit Test Plans, System Test Plans, Integration Test Plans, Load and Stress Test Plan. The Test Results should be submitted to COMESA as evidence of full-fledged testing carried out prior to UAT.</p>\n\n<p>The vendor should submit UAT test scripts to ensure that the UAT scenarios cater for all the requirements expressed by the users. A comprehensive user manual should be made available before the training.</p>\n\n<p>The UAT exercise should consist of different rounds of testing as follows:</p>\n\n<ol>\n\t<li>Round 1 should consist of executing all the test scenarios business flow wise and identifying list of issues if any by the users;</li>\n\t<li>Vendor should commit to ensure that issues identified in Round 1 are fully addressed to the satisfaction of the users prior to starting the next round (Round 2);</li>\n\t<li>Vendor should also commit to producing evidence that that non-regression testing has been performed prior to starting next round and</li>\n\t<li>Subsequent rounds are conducted until no further issues are identified.</li>\n</ol>\n\n<p><strong>9.2 Quality Assurance Plan</strong></p>\n\n<p>The vendor shall provide a proper Quality Assurance plan to ensure the success of the project.&nbsp; The vendor should ensure that all work products are evaluated, and that evidence is provided to the fact that:</p>\n\n<ol>\n\t<li>It conforms to specified requirements.</li>\n\t<li>It has been produced according to the project standards and processes.</li>\n</ol>\n\n<ol>\n\t<li><strong>Change Management </strong></li>\n</ol>\n\n<p>Change management strategies will be employed to ensure smooth transition and adoption of the new Planning &amp; Budgeting system. As the implementation and adoption of business process changes will be vital to the success of the project, the consultant should be able to explain and communicate business process changes and their associated requirements to individuals throughout the COMESA including to executive managers, division heads, subject matter experts, and end-users. The consultant shall provide guidance and mentor the project core team to successfully implement the overall business transformation and system changes for the COMESA. The change management plan will include amongst others:</p>\n\n<ul>\n\t<li>Communication plan (regular updates, town hall meetings, FAQ);</li>\n\t<li>Change impact assessment and Resistance management;</li>\n\t<li>Training and Development plan for staffs affected by the change;</li>\n\t<li>Feedback mechanisms, and</li>\n\t<li>Contingency plan.</li>\n</ul>\n\n<ol>\n\t<li><strong>Project Deliverables</strong></li>\n</ol>\n\n<p>The following mandatory deliverables should be provided:</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p><strong>Deliverable</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p><strong>Details</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>1.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Project Management Plan and Project Documents</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The project management plan shall cover the following aspects:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>Project approach and organization</li>\n\t\t\t\t<li>Requirement Management</li>\n\t\t\t\t<li>Scope Management</li>\n\t\t\t\t<li>Schedule Management</li>\n\t\t\t\t<li>Deliverable Plan</li>\n\t\t\t\t<li>Configuration management</li>\n\t\t\t\t<li>Quality Management</li>\n\t\t\t\t<li>Risk Management</li>\n\t\t\t\t<li>Change management, communication, and training plan</li>\n\t\t\t\t<li>Go-Live Plan</li>\n\t\t\t\t<li>Warranty service plan</li>\n\t\t\t</ol>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>The vendor shall update the project plan at the end of each project phases. Furthermore, the vendor is expected to provide regular weekly progress reports or as specified by COMESA project steering committee.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>2.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The solution blueprint shall cover all the functional, technical, migration and security requirements as well as the system architecture of the proposed solution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>3.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Training</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Training for business users as well as Administration training for IT department and IT Auditor. A comprehensive user manuals and Administrator manual for each module configured shall be delivered.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>4.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>User Acceptance Test Document</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>Vendor should submit the UAT test scripts and ensure that all the UAT scenarios are catered for the requirements expressed by the users. The UAT exercise should consist of different rounds of testing. The vendor should ensure that a full-fledged testing has been carried out prior to UAT.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>5.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>A fully operational and bug free efficient system as per requirement</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide a fully operational and bug free system prior to Go-Live. The following will have to be addressed to the satisfaction of the users prior to Go-Live of the system:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>All requirements of the users (including IT Security requirements) have been catered for in the Application Software.</li>\n\t\t\t\t<li>All identified scenarios are fully and comprehensively tested during each round of UAT.</li>\n\t\t\t\t<li>All bugs identified during UAT have been dealt with.</li>\n\t\t\t\t<li>Trainings on System Administration and Application Software have been delivered.</li>\n\t\t\t\t<li>All documentations are provided</li>\n\t\t\t</ol>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Commissioning report</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:82.2pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The commissioning report shall include among others:</p>\n\n\t\t\t<ol>\n\t\t\t\t<li>The level of customization for each module configured.</li>\n\t\t\t\t<li>System setup document</li>\n\t\t\t\t<li>Security Policies</li>\n\t\t\t</ol>\n\n\t\t\t<p>The sign-off shall be done at the end of the operational acceptance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:42.3pt\">\n\t\t\t<p>6.</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.55pt\">\n\t\t\t<p>Warranty Plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide all the terms and condition of the warranty.</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:42.3pt\">\n\t\t\t<p>7.</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:127.55pt\">\n\t\t\t<p>Support Agreement</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:71.95pt; vertical-align:top; width:297.65pt\">\n\t\t\t<p>The vendor shall provide all the terms and condition of the support. Furthermore, the vendor should provide a monthly progress report on maintenance &amp; support activities and a periodic SLA performance report.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Training, Knowledge transfer and Support</strong></li>\n</ol>\n\n<p>Comprehensive training will be provided to end-users and administrators to ensure proper knowledge transfer and proficiency in using the Planning &amp; Budgeting system. The training programme shall be designed for:</p>\n\n<ul>\n\t<li>Business users to continue operational responsibility for the delivered solution.</li>\n\t<li>IT staff to enable first line support to users and for the proper administration of the delivered solution.</li>\n\t<li>Business users and IT staff create and eventually customize reports/dashboards using the proposed reporting tools.</li>\n\t<li>Business users and IT staff perform basic administration tasks like create users, assign roles to users and de-activate users.</li>\n\t<li>Business users adopt to operational changes that may arise due to the implementation of the new system for seamless uptake.</li>\n</ul>\n\n<p>A minimum of three (3) months on-site post implementation support will be provided. Additionally, the selected consultant shall provide ongoing support will be available through:</p>\n\n<ul>\n\t<li>Helpdesk support,</li>\n\t<li>Online resources (knowledge base, FAQs), and</li>\n\t<li>Periodic refresher training sessions</li>\n</ul>\n\n<ol>\n\t<li><strong>Evaluation and Monitoring</strong></li>\n</ol>\n\n<p><strong>The success of the Planning &amp; Budgeting implementation project will be evaluated based on predefined success criteria, including:</strong></p>\n\n<ul>\n\t<li>Achievement of project milestones and deliverables within the established timeline and budget,</li>\n\t<li>User satisfaction with the system functionality and usability,</li>\n\t<li>Improvement in Planning and Budgeting process efficiency and accuracy,</li>\n\t<li>Seamless integration with other systems (Sun Finance System, E-Procurement, M&amp;E system, HRMS, Document Management System), and</li>\n\t<li>Reduction in manual tasks and administrative overhead.</li>\n</ul>\n\n<p><strong>The project committee through regular project status meetings and reports will monitor progress.</strong></p>\n\n<ol>\n\t<li><strong>Other Requirements</strong></li>\n</ol>\n\n<ol>\n\t<li>The vendor is required to sign a Non-Disclosure Agreement (NDA).</li>\n\t<li>The system should support multilingual.</li>\n\t<li>The Planning &amp; Budgeting system shall be developed using the latest and most up-to-date technologies and frameworks.</li>\n\t<li>The security features of the system shall meet industry standards and best practices.</li>\n</ol>\n\n<ol>\n\t<li><strong>Payment Terms </strong></li>\n</ol>\n\n<p>The structure of payment shall be as follows:</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Implementation Services</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>S.N</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Deliverable</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>Payment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Inception Report with agreed project implementation plan</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>10%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Detailed Software Requirements Specifications</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>30%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Solution Prototype based on the Solution Blueprint</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Go-live</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:21.05pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:290.6pt\">\n\t\t\t<p>Retention Money- 12 months after Go-Live</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:155.85pt\">\n\t\t\t<p>20%</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Support Services</strong></li>\n</ol>\n\n<p>&nbsp;</p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>S.N</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>Deliverable</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>Payment</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>12 Months post go-live Warranty</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>0%</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:26.85pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:286.7pt\">\n\t\t\t<p>Annual Maintenance Contract</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:153.95pt\">\n\t\t\t<p>Annually</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Company Profile and Profile of Consultants</strong></li>\n</ol>\n\n<p>A company profile of the Vendor as well as a list of staff that would be involved in the project and their respective qualifications and experience should be provided.</p>\n\n<p>The Consultant shall determine the number and nature of experts they will require to achieve the objectives of the assignment, in accordance with their proposed approach and methodology. Nonetheless, the Consultant&rsquo;s team shall be composed of at least four (4) experts with extensive demonstrable experience/knowledge as follows:</p>\n\n<ol>\n\t<li><strong>Project Manager</strong></li>\n</ol>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:127.35pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:354.05pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:127.35pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Master&rsquo;s degree in Computer Science, business administration, project management or related discipline, or 5 years relevant professional experience in project management.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Professional certification in project/programme management. (Desirable)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:354.05pt\">\n\t\t\t<p>A minimum of 5 years&rsquo; experience in managing IT projects preferably with a focus on Planning &amp; Budgeting system implementations, specifically within the African region.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Professional certifications in Finance or Change Management are desirable. Strong communication, leadership, and problem-solving skills are essential for effective project execution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Solution Architect</strong></li>\n</ol>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:127.35pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:354.05pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:127.35pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:354.05pt\">\n\t\t\t<p>A minimum of 5 years of experience in solution architecture, with a focus on Finance/ Planning &amp; Budgeting system implementations.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Relevant certifications in solution architecture, enterprise architecture, or Finance/ Planning &amp; Budgeting technologies (e.g., TOGAF, AWS Certified Solutions Architect, Finance/ Planning &amp; Budging platform-specific certifications) is desirable.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Strong communication, leadership, and problem-solving skills are essential for effective project execution.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Functional Expert</strong></li>\n</ol>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.55pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.95pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.55pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.95pt\">\n\t\t\t<p>A minimum of 5 years of hands-on experience working with Finance/ Planning &amp; Budgeting system functionalities and implementation.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Proficiency in Finance / Planning &amp; Budgeting system platforms and related technologies, with specific expertise in implementation, customization, and maintenance.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>In-depth knowledge of Finance /Planning &amp; Budgeting system platforms.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Proficiency in mapping Finance/Planning &amp; Budgeting processes and aligning them with IT system capabilities to optimize workflows.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Proven ability to gather and document detailed requirements from Finance/ Planning &amp; Budgeting system and other stakeholders for Finance/ Planning &amp; Budgeting system configurations and customizations.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Hands-on experience in configuring and customizing Finance/ Planning &amp; Budgeting systems to meet organizational needs.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Experience in conducting comprehensive testing of Finance/ Planning &amp; Budgeting solutions to ensure functionality, accuracy, and compliance.</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<ol>\n\t<li><strong>Technical Expert</strong></li>\n</ol>\n\n<p><strong>&nbsp;</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.8pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.7pt\">\n\t\t\t<p><strong>Requisite Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:124.8pt\">\n\t\t\t<p>Bsc in Computer Science or related discipline</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:342.7pt\">\n\t\t\t<p>A minimum of 5 years of hands-on experience working with Finance/ Planning &amp; Budgeting technologies.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Proficiency in Finance/ Planning &amp; Budgeting platforms and related technologies, with specific expertise in implementation, customization, and maintenance.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Hands-on experience with Finance/ Planning &amp; Budgeting.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Strong programming skills in languages relevant to Finance/ Planning &amp; Budgeting system customization (e.g., Java, Python, SQL).</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Proficiency in scripting languages for automation and integration purposes.</p>\n\n\t\t\t<p>&nbsp;</p>\n\n\t\t\t<p>Expertise in database management systems, particularly those used in Finance/ Planning &amp; Budgeting system (e.g., MySQL, Oracle, SQL Server)</p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>A Project Team Composition Template clearly indicating the manpower input months should be provided as per format in Annex 3.</p>\n\n<p>In this respect, Vendors are required to submit information on reference sites and staff profiles as per format at Annex 4.</p>\n\n<p>COMESA shall be notified in writing of any change or replacement of staff being assigned on the project as per their response of the bidding document. Respective qualifications and experience of any new staff joining the implementation team should be provided. COMESA reserves the right to approve any such change.</p>\n\n<ol>\n\t<li><strong>Customer References</strong></li>\n</ol>\n\n<p>To be eligible for this exercise, vendors should have at least three (3) reference sites where they have successfully implemented a similar project.</p>\n\n<p><strong>Annexes</strong></p>\n\n<p><strong>Annex 1: Process Steps for Planning and Budgeting</strong></p>\n\n<table cellspacing=\"0\" style=\"width:100%\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><strong><em>Step</em></strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; width:15.16%\">\n\t\t\t<p><strong>Who</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; width:59.68%\">\n\t\t\t<p><strong>Performs what</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white; width:15.64%\">\n\t\t\t<p><strong>System</strong><strong>s</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>1</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.16%\">\n\t\t\t<p>Director/Unit Head/ Officers</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Selects Plan of Activities for the current year. The system shall display planned activities for the current year from MTSP (M&amp;E system) for the department/unit. Information that will be available include Strategic Pillar, expected result, indicators, available funding (partners), budget, available funds, means of implementation, expenditure items, etc.</li>\n\t\t\t\t<li>Directors and Team Leaders will identify and plan activities (Means of implementation, source of funding (multiple sources), start date, end date, Estimated Budget and responsible officer) for the given year.</li>\n\t\t\t\t<li>Information like standard rate, exchange rate, Analysis Dimension, etc. will be automatically map with Sun system while selecting the activities.</li>\n\t\t\t\t<li>Directors and Team Leaders will have the option to save working documents as Draft until approved by Strategic Planning/ ASG/SG/Council.</li>\n\t\t\t\t<li>Once the draft plan of activities is finalized at the Division/Unit level, same will be sent to strategic planning.</li>\n\t\t\t\t<li>An email notification is sent to Strategic Planning to review plan of activities.</li>\n\t\t\t\t<li>During budget implementation, detailed budgets will be prepared by Directors/Unit Heads for the approval of the Assistant Secretary General &ndash; Finance on the recommendation of the Director of Budget and Finance.</li>\n\t\t\t\t<li>During work programme implementation, quarterly and individual aide memoires will be prepared by Unit/Division Heads for the approval of the respective Executive Management upon confirmation of funds by the Director of Finance.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.64%\">\n\t\t\t<p>M&amp;E &ndash; Plan of activities from MTSP for current year</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>2</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Strategic Planning</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Strategic Planning review plan of activities and ensure Divisional and Unit work plans aligns to the approved medium term strategic plan, Council decisions, emerging economic trends and Monitoring &amp; Evaluation Indicators.</li>\n\t\t\t\t<li>An email notification should be sent to Directors/Head of Unit/ Assistant Secretary General (Programme) once the plan of activities has been reviewed by Strategic Planning.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Planning</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>3</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Assistant Secretary General (Programme)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Assistant Secretary General (Programme) validate the activities and programmes.</li>\n\t\t\t\t<li>Once the plan of activities has been validated, the plan is sent to Finance Director to recommend for costing.</li>\n\t\t\t\t<li>An email notification should be sent to Directors/Head of Unit/ Assistant Secretary General (Programme)/ Finance Director once the plan of activities has been validated by Assistant Secretary General (Programme).</li>\n\t\t\t\t<li>During budget implementation, the Assistant Secretary General Programmes will approve quarterly and individual aide memoires upon confirmation of budget availability by Director of Finance</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Planning</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>4</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Finance Director</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Possibility to view plan of work by Division/Unit</li>\n\t\t\t\t<li>Assign Finance Expert to costs the planned activities on the basis of budget ceilings, standard costing rates as guided by organization rules and regulations.</li>\n\t\t\t\t<li>An email notification is sent to the Assigned Finance Expert.</li>\n\t\t\t\t<li>During budget implementation, detailed budgets and aide memoires will be prepared at activity level by Unit/Division Head for approval of the Finance Director on the recommendation of the respective Finance Experts</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Planning</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>5</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.16%\">\n\t\t\t<p>Assigned Finance Expert</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>The assigned Finance Expert process and review plan of activities</li>\n\t\t\t\t<li>Assigned Officer will review completeness of information.</li>\n\t\t\t\t<li>Assigned Finance Expert will consolidate budget for the department/unit. The system should have an interface will the Sun System where Finance Expert will be able to retrieve information such as budget available, cost centre, standard rate, exchange rate, Analysis Dimension, Analysis Code, etc.&nbsp;</li>\n\t\t\t\t<li>Assigned Officer has the possibility to request information to Division/Unit/Project.</li>\n\t\t\t\t<li>Assigned Officer will review budget and send recommendation to Finance Officer</li>\n\t\t\t\t<li>During budget implementation, the Finance Expert will confirm and commit funds for the detailed activities for approval of the Assistant Secretary General Administration upon the recommendation of Director Finance</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.64%\">\n\t\t\t<p>Budgeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>6</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.16%\">\n\t\t\t<p>Finance Officer/ Grant Accountant</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Receives a notification from Finance Expert</li>\n\t\t\t\t<li>Approve or reject based on recommendation from Finance Expert and Budget availability.</li>\n\t\t\t\t<li>Notification sends to Director Finance for approval of budget. In case of rejection, ground of refusal is specified.</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:#ededed; width:15.64%\">\n\t\t\t<p>Budgeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; border-color:#c9c9c9; width:9.52%\">\n\t\t\t<p><em>7</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Director of Finance</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Receives a notification for approval or rejection of budget per division/unit from Finance Officer.</li>\n\t\t\t\t<li>Approve or reject based on recommendation from Finance Expert and Budget available.</li>\n\t\t\t\t<li>Notification sends to Assistant Secretary General (Admin &amp; Finance) on approval of budget from Finance. In case of rejection, ground of refusal is specified.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Budgeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>8</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Assistant Secretary General (Admin &amp; Finance)</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Receives a notification for approval or rejection of budget per division/unit.</li>\n\t\t\t\t<li>Approve or reject based on recommendation from Finance Director and Budget available.</li>\n\t\t\t\t<li>Possibility to approve or reject budget.</li>\n\t\t\t\t<li>Upon approval of budget for all Division/Unit, Notification is sent to Secretary General.</li>\n\t\t\t</ul>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Budgeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>9</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Secretary General</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Receives a notification for approval or rejection of organization wide work programme and budget.</li>\n\t\t\t\t<li>Review and approve of the organization wide work programme and budget for submission to Council upon the recommendation of the Assistant Secretaries General.</li>\n\t\t\t\t<li>Notification sends to Assistant Secretaries/Directors/ Head of Unit/Finance Experts/ Procurement/Other Stakeholders on approval of budget.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>Budgeting</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>10</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>M&amp;E</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>Planning and Budgeting is automatically exported to M&amp;E system upon Council approval of organization wide work programme and budget after the review of the Audit and Budget Committee, Administrative and Budgetary Committee and the Inter-Governmental Committee.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>M&amp;E</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white; width:9.52%\">\n\t\t\t<p><em>11</em></p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.16%\">\n\t\t\t<p>Procurement</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:59.68%\">\n\t\t\t<ul>\n\t\t\t\t<li>The Procurement plan will be automatically generated from the approved plan and budget for the year.</li>\n\t\t\t</ul>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:15.64%\">\n\t\t\t<p>E-Procurement</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p>&nbsp;</p>\n\n<p><strong>Annex 2: Proposed Process Flow Diagram</strong></p>\n\n<p><strong>Annex 3: Project Team Composition Template</strong></p>\n\n<table border=\"1\" cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:28.1pt\">\n\t\t\t<p><strong>SN</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:127.7pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td rowspan=\"2\" style=\"height:14.65pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.65pt; vertical-align:top; width:233.8pt\">\n\t\t\t<p><strong>Manpower Input in Months</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.9pt\">\n\t\t\t<p><strong>Remote</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>On-Site</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:77.95pt\">\n\t\t\t<p><strong>Total</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Project Manager</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Jane Doe</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Solution Architect</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>0</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation III</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation IV</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation V</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VI</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>7</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>4</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"vertical-align:top; width:28.1pt\">\n\t\t\t<p>8</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:127.7pt\">\n\t\t\t<p>Expert VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>Designation VIII</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>5</p>\n\t\t\t</td>\n\t\t\t<td style=\"vertical-align:top; width:77.95pt\">\n\t\t\t<p>6</p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>Annex 4: Individual Team Profiles&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p>\n\n<table cellspacing=\"0\" style=\"width:493.3pt\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#0070c0; height:21.95pt; width:493.3pt\">\n\t\t\t<p><strong>Curriculum Vitae: Expert 1</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Role in the Project</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Role X</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Name of Expert</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Expert 1</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Date of Birth</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Dd/mm/yyyy</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Nationality</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>XXXX</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Education</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Degree</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>College</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Year</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Bachelor of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2002</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Master of Science XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>College Name</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>2010</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Professional Certifications</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p><strong>No.</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p><strong>Certification </strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p><strong>Body and Number</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p><strong>Status</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Active</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:40.9pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:194.95pt\">\n\t\t\t<p>Certified XXX</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:206.35pt\">\n\t\t\t<p>Body X Certificate #</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:50.95pt\">\n\t\t\t<p>Expired</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Expert Profile Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"background-color:#5b9bd5; height:14.6pt; width:493.3pt\">\n\t\t\t<p><strong>Work Experience</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>No</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p><strong>Employer</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p><strong>From</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>To</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p><strong>Designation</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>1</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>2</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p>3</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:100.85pt\">\n\t\t\t<p>Employer X</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:101.75pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p>00/00/0000</p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>Designation x</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Experience Related to Current Assignment</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Project Client</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Client Name</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Project Summary</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"7\" style=\"height:14.6pt; vertical-align:top; width:493.3pt\">\n\t\t\t<p><strong>Responsibilities in the project</strong></p>\n\n\t\t\t<p>&nbsp;</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td colspan=\"4\" style=\"height:14.6pt; vertical-align:top; width:235.9pt\">\n\t\t\t<p><strong>Technologies Used</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:257.35pt\">\n\t\t\t<p>Technology 1, Technology 2, Technology N</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:33.25pt\">\n\t\t\t<p><strong>Sign</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"3\" style=\"height:14.6pt; vertical-align:top; width:202.6pt\">\n\t\t\t<p>Expert Signature</p>\n\t\t\t</td>\n\t\t\t<td style=\"height:14.6pt; vertical-align:top; width:128.6pt\">\n\t\t\t<p><strong>Date</strong></p>\n\t\t\t</td>\n\t\t\t<td colspan=\"2\" style=\"height:14.6pt; vertical-align:top; width:128.7pt\">\n\t\t\t<p>00/00/00</p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t\t<td>&nbsp;</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p>&nbsp;</p>"},{"id":"OP00277713","notice_type":"Request for Expression of Interest","noticedate":"06-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-03-25T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia","project_id":"P168115","project_name":"Somalia Capacity Advancement, Livelihoods and Entrepreneurship, through Digital Uplift Project (SCAL","bid_reference_no":"SO-MOF-404088-CS-INDV","bid_description":"System Administrator (2) For NIRA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ministry of Finance - Shanagi District,\nMogadishu, Somalia.","contact_ctry_name":"Somalia","contact_email":"scaleduppc@piu.mof.gov.so","contact_name":"Abukar  Osman","contact_organization":"Federal Republic of Somalia, Ministry of Finance, Office of the Director General","contact_phone_no":"+2526176352","submission_date":"2024-03-06T00:00:00Z","notice_text":"<p><strong>FEDERAL GOVERNMENT OF SOMALIA</strong></p>\n\n<p><strong>MINISTRY OF FINANCE</strong></p>\n\n<p><strong><u>REQUEST FOR EXPRESSION OF INTEREST (REOI)</u></strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Country:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Federal Government of Somalia (FGS)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Name of the Project:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Somalia Capacity Advancement, Livelihood and Entrepreneurship, through Digital Uplift&nbsp;&nbsp; Project (SCALED-UP)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Assignment Title:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>System Administrator for National Identification and Registration Authority (NIRA) (Individual Consultant)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Project ID:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>P168115</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Individual/Firm:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Individual Selection</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Deadline&nbsp;for submission of EOI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>25th March 2024 4:00PM.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>1. Background:</strong>&nbsp;The National Identification and Registration Authority (NIRA) is a Government Agency in Somalia, first established in 2020, with the aim of creating and maintaining the national identification system. NIRA is, inter alia, responsible for registering citizens and residents and for providing them with secure and verifiable credentials, including a unique identification number and a national identity card. It also serves as a trusted provider of identity verification and authentication services, promoting the use of the foundational identification system. With the establishment of NIRA Somalia, the government is committed to providing a reliable and efficient identification system that will enable individuals to access services and participate in the development of the country.</p>\n\n<p>The Federal Government of Somalia is implementing the World Bank-financed Somalia Capacity Advancement, Livelihood and Entrepreneurship, through Digital Uplift Project (SCALED-UP) and intends to use part of the proceeds to hire a <strong>System Administrators </strong>(Individual Consultant) for the National Identification and Registration Authority.</p>\n\n<p><strong>2. Responsibilities: </strong>The consultant will Develop and maintain all systems, applications, security, and network configurations; Installing, configuring, and maintaining the networked computer system, including hardware, system software, and applications; Setting up new users and giving them access to the intranet upon approval; Monitoring the firewall and the internet connection for security risks; Employing the latest security protocols; Diagnosing and resolving hardware, software, networking, and system issues when they arise; Making recommendations for replacing and upgrading defective or outdated components when necessary; Monitoring performance and maintaining systems according to requirements. All other specific tasks detailed in The Terms of Reference (TOR) for the assignment that can be found at the following website:&nbsp;&nbsp; https://mof.gov.so/publications/system-administrator-nira</p>\n\n<p><strong>3. Duration:</strong>&nbsp;The proposed duration for the assignment is Twelve Months (12) calendar months from starts date.</p>\n\n<p><strong>4. Selection Criteria:&nbsp;</strong>The selection shall be based on qualification, experience and skills of the candidate and followed by an interview. The qualifications, experience and competencies include:</p>\n\n<ul>\n\t<li>Bachelor&rsquo;s degree in computer science, Information Technology, or a related field.</li>\n\t<li>Five (5) years&#39; experience in the field of computer networking and system administration, including at least two (2) years direct experience in maintaining computer servers and networks.</li>\n\t<li>Microsoft MCSE certification or similar is a plus.</li>\n\t<li>Proven experience as a System Administrator, Network Administrator, or similar role.</li>\n\t<li>Experience with databases, networks (LAN, WAN) and patch management</li>\n\t<li>Knowledge of system security (e.g., intrusion detection systems) and data backup/recovery.</li>\n\t<li>Ability to create scripts in Python, Perl, Java, or other languages.</li>\n\t<li>Familiarity with various operating systems and platforms.</li>\n</ul>\n\n<ul>\n\t<li>Ability to prioritize a wide range of workloads with critical deadlines.</li>\n\t<li>Availability outside of working hours to resolve emergency issues promptly.</li>\n\t<li>Excellent analytical, problem-solving, communication, and interpersonal skills.</li>\n\t<li>Proficiency in Somali and English, both spoken and written.</li>\n</ul>\n\n<p><strong>5. The Ministry of Ministry of Finance</strong>&nbsp;now invites eligible consulting (&ldquo;Consultants&rdquo;) to indicate their interest in providing the above-mentioned Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services and furnish the Curriculum Vitae (CV).</p>\n\n<p><strong>6.&nbsp;</strong>Attention of interested Consultants is drawn to section III, para 3.14,3.16 &amp; 3.17 of the World Bank&rsquo;s&nbsp;<em>Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services dated September 2023&nbsp;</em>(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;</p>\n\n<p><strong>7.&nbsp;</strong>A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations.</p>\n\n<p><strong>8.&nbsp;</strong>Interested Consultant may obtain further information (in person or by e-mail) at the address below during office hours from 8.00 a.m.&ndash; 4.00 p.m. Saturday to Thursday except on public holidays.</p>\n\n<p><strong>9.</strong>&nbsp;<strong>Deadline for submission:</strong>&nbsp;Expressions of interest should be delivered in a written form to the address below (in person, or by e-mail) by&nbsp;<strong>25th March 2024 4:00PM. local Time</strong>.</p>\n\n<p><strong>Attention</strong></p>\n\n<p>Project Coordinator,&nbsp;SCALED-UP Project,</p>\n\n<p>Ministry of Finance,&nbsp;Federal Government of Somalia,&nbsp;Shangani District,&nbsp;Mogadishu, Somalia</p>\n\n<p>Email Address: bid.scaledup@piu.mof.gov.so</p>\n\n<p>Cc: hr@nira.gov.so</p>"},{"id":"OP00277714","notice_type":"Request for Expression of Interest","noticedate":"06-Mar-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-03-25T00:00:00Z","submission_deadline_time":"16:00","project_ctry_name":"Somalia","project_id":"P168115","project_name":"Somalia Capacity Advancement, Livelihoods and Entrepreneurship, through Digital Uplift Project (SCAL","bid_reference_no":"SO-MOF-404083-CS-INDV","bid_description":"System Administrator (1) For NIRA","procurement_group":"CS","procurement_method_code":"INDV","procurement_method_name":"Individual Consultant Selection","contact_address":"Ministry of Finance - Shanagi District,\nMogadishu, Somalia.","contact_ctry_name":"Somalia","contact_email":"scaleduppc@piu.mof.gov.so","contact_name":"Abukar  Osman","contact_organization":"Federal Republic of Somalia, Ministry of Finance, Office of the Director General","contact_phone_no":"+2526176352","submission_date":"2024-03-06T00:00:00Z","notice_text":"<p><strong>&nbsp;FEDERAL GOVERNMENT OF SOMALIA</strong></p>\n\n<p><strong>MINISTRY OF FINANCE</strong></p>\n\n<p><strong><u>REQUEST FOR EXPRESSION OF INTEREST (REOI)</u></strong></p>\n\n<table cellspacing=\"0\">\n\t<tbody>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Country:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Federal Government of Somalia (FGS)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Name of the Project:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Somalia Capacity Advancement, Livelihood and Entrepreneurship, through Digital Uplift&nbsp;&nbsp; Project (SCALED-UP)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Assignment Title:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>System Administrator for National Identification and Registration Authority (NIRA) (Individual Consultant)</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Project ID:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>P168115</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Individual/Firm:</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Individual Selection</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t\t<tr>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>Deadline&nbsp;for submission of EOI</strong></p>\n\t\t\t</td>\n\t\t\t<td style=\"background-color:white\">\n\t\t\t<p><strong>25th March 2024 4:00PM.</strong></p>\n\t\t\t</td>\n\t\t</tr>\n\t</tbody>\n</table>\n\n<p><strong>1. Background:</strong>&nbsp;The National Identification and Registration Authority (NIRA) is a Government Agency in Somalia, first established in 2020, with the aim of creating and maintaining the national identification system. NIRA is, inter alia, responsible for registering citizens and residents and for providing them with secure and verifiable credentials, including a unique identification number and a national identity card. It also serves as a trusted provider of identity verification and authentication services, promoting the use of the foundational identification system. With the establishment of NIRA Somalia, the government is committed to providing a reliable and efficient identification system that will enable individuals to access services and participate in the development of the country.</p>\n\n<p>The Federal Government of Somalia is implementing the World Bank-financed Somalia Capacity Advancement, Livelihood and Entrepreneurship, through Digital Uplift Project (SCALED-UP) and intends to use part of the proceeds to hire a <strong>System Administrators </strong>(Individual Consultant) for the National Identification and Registration Authority.</p>\n\n<p><strong>2. Responsibilities: </strong>The consultant will Develop and maintain all systems, applications, security, and network configurations; Installing, configuring, and maintaining the networked computer system, including hardware, system software, and applications; Setting up new users and giving them access to the intranet upon approval; Monitoring the firewall and the internet connection for security risks; Employing the latest security protocols; Diagnosing and resolving hardware, software, networking, and system issues when they arise; Making recommendations for replacing and upgrading defective or outdated components when necessary; Monitoring performance and maintaining systems according to requirements. All other specific tasks detailed in The Terms of Reference (TOR) for the assignment that can be found at the following website:&nbsp;&nbsp; https://mof.gov.so/publications/system-administrator-nira</p>\n\n<p><strong>3. Duration:</strong>&nbsp;The proposed duration for the assignment is Twelve Months (12) calendar months from starts date.</p>\n\n<p><strong>4. Selection Criteria:&nbsp;</strong>The selection shall be based on qualification, experience and skills of the candidate and followed by an interview. The qualifications, experience and competencies include:</p>\n\n<ul>\n\t<li>Bachelor&rsquo;s degree in computer science, Information Technology, or a related field.</li>\n\t<li>Five (5) years&#39; experience in the field of computer networking and system administration, including at least two (2) years direct experience in maintaining computer servers and networks.</li>\n\t<li>Microsoft MCSE certification or similar is a plus.</li>\n\t<li>Proven experience as a System Administrator, Network Administrator, or similar role.</li>\n\t<li>Experience with databases, networks (LAN, WAN) and patch management</li>\n\t<li>Knowledge of system security (e.g., intrusion detection systems) and data backup/recovery.</li>\n\t<li>Ability to create scripts in Python, Perl, Java, or other languages.</li>\n\t<li>Familiarity with various operating systems and platforms.</li>\n</ul>\n\n<ul>\n\t<li>Ability to prioritize a wide range of workloads with critical deadlines.</li>\n\t<li>Availability outside of working hours to resolve emergency issues promptly.</li>\n\t<li>Excellent analytical, problem-solving, communication, and interpersonal skills.</li>\n\t<li>Proficiency in Somali and English, both spoken and written.</li>\n</ul>\n\n<p><strong>5. The Ministry of Ministry of Finance</strong>&nbsp;now invites eligible consulting (&ldquo;Consultants&rdquo;) to indicate their interest in providing the above-mentioned Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services and furnish the Curriculum Vitae (CV).</p>\n\n<p><strong>6.&nbsp;</strong>Attention of interested Consultants is drawn to section III, para 3.14,3.16 &amp; 3.17 of the World Bank&rsquo;s&nbsp;<em>Procurement Regulations for IPF Borrowers: Procurement in Investment Projects Financing Goods, Works, Non -Consulting and Consulting Services dated September 2023&nbsp;</em>(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;&nbsp;</p>\n\n<p><strong>7.&nbsp;</strong>A Consultant will be selected in accordance with the Individual Consultant method set out in the World Bank Procurement Regulations.</p>\n\n<p><strong>8.&nbsp;</strong>Interested Consultant may obtain further information (in person or by e-mail) at the address below during office hours from 8.00 a.m.&ndash; 4.00 p.m. Saturday to Thursday except on public holidays.</p>\n\n<p><strong>9.</strong>&nbsp;<strong>Deadline for submission:</strong>&nbsp;Expressions of interest should be delivered in a written form to the address below (in person, or by e-mail) by&nbsp;<strong>25th March 2024 4:00PM. local Time</strong>.</p>\n\n<p><strong>Attention</strong></p>\n\n<p>Project Coordinator,&nbsp;SCALED-UP Project,</p>\n\n<p>Ministry of Finance,&nbsp;Federal Government of Somalia,&nbsp;Shangani District,&nbsp;Mogadishu, Somalia</p>\n\n<p>Email Address: bid.scaledup@piu.mof.gov.so</p>\n\n<p>Cc: hr@nira.gov.so</p>"},{"id":"OP00276099","notice_type":"Request for Expression of Interest","noticedate":"28-Feb-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-03-15T00:00:00Z","submission_deadline_time":"18:00","project_ctry_name":"Armenia","project_id":"P166274","project_name":"Armenia EITI Support","bid_reference_no":"EITI-QCBS-1.3-1","bid_description":"Consulting services for the EITI data systematic disclosing and making publicly accessible","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Republic sq., Gov. building 1, Yerevan 0010","contact_ctry_name":"Armenia","contact_email":"eiti@gov.am","contact_name":"Hasmik Manukyan","contact_organization":"MSP-PMU-OPM","contact_phone_no":"+37410515932","submission_date":"2024-02-28T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES - FIRMS SELECTION)</strong></p><p>&nbsp;</p><p>&nbsp;</p><p><strong><em>THE REPUBLIC OF ARMENIA</em></strong></p><p><strong><em>&quot;ARMENIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE SUPPORT: ADDITIONAL FINANCING&rdquo; EGPS </em></strong></p><p><strong><em>Grant No. TF0B4808 </em></strong></p><p>&nbsp;</p><p><strong><em>Assignment Title: Consulting services for the EITI data systematic disclosing and making publicly accessible </em></strong></p><p>&nbsp;</p><p><strong>Reference No</strong>. (as per Procurement Plan): <strong>EITI-QCBS-1.3-1</strong>&nbsp;</p><p>&nbsp;</p><p>The Republic of Armenia has received financing from the World Bank toward the cost of the &quot;Armenia Extractive Industries Transparency Initiative Support: Additional Financing&rdquo; EGPS, and intends to apply part of the proceeds for consulting services.</p><p>&nbsp;</p><p>The consulting <strong>services (&ldquo;the Services&rdquo;) include the services for EITI data systematic disclosing and making publicly accessible.</strong></p><p><strong>The implementation period is about 6 months, but not later than 15 December, 2024.</strong></p><p>&nbsp;</p><p>The detailed Terms of Reference (TOR) for the assignment are<em> </em>attached to this request for expressions of interest.</p><p>&nbsp;</p><p>The <strong>RA Prime Minister&rsquo;s Office</strong> now invites eligible firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:</p><p>&nbsp;The qualifications and experience of the <strong>Consultant </strong>must meet the minimum requirements below:</p><ul><li>The company must have at least 5 years of experience in developing public management information systems in RA.</li><li>The company must have at least 2 successfully implemented and commissioned similar public management information systems within the last 5 years. The company must submit reference letters certifying the proper and timely implementation of the works from the main customers of the above-mentioned systems.</li></ul><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>&nbsp;</p><p>The shortlist will contain not fewer than five (5) and not more than eight (8) eligible firms.</p><p>&nbsp;</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (revised November 2017, August 2018 and November 2020) &nbsp;(&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest. Particularly, please refer to the following specific information on conflict of interest related to this assignment:</p><p>Consultants (including their experts and other personnel, and sub-consultants), that have a close business or family relationship with a professional staff of the Borrower, or of the project implementing agency, or of a recipient of a part of the Bank&rsquo;s financing, or any other party representing or acting on behalf of the Borrower, that is directly or indirectly involved in any part of: i. the preparation of the TOR for the assignment; ii. the selection process for the contract; or iii. the supervision of the contract, may not be awarded a contract, unless the conflict stemming from this relationship has been resolved in a manner acceptable to the Bank throughout the selection process and the execution of the contract.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>&nbsp;</p><p>A Consultant will be selected in accordance with the Framework Agreement arrangements described in the Procurement Regulations and to be specifically set out in the Request for Proposals.</p><p>&nbsp;</p><p>Further information can be obtained at the address below during office hours<em> 09:00 to 17:00</em>.</p><p>&nbsp;</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by <strong>15.03.2024 at 18:00 the local time</strong>.</p><p>&nbsp;</p><p><strong>EITI ARMENIA NATIONAL SECRETARIAT</strong></p><p><strong>PRIME MINISTER&rsquo;S OFFICE OF ARMENIA </strong></p><p><strong><em>Attn: </em></strong><strong><em>Hasmik Manukyan&nbsp; </em></strong></p><p>&nbsp;</p><p><strong>ARMENIA EXTRACTIVE INDUSTRIES TRANSPARENCY</strong></p><p><strong>&nbsp;INITIATIVE SUPPORT (EITI) </strong><strong>NATIONAL</strong><strong> COORDINATOR</strong></p><p><strong>Government house 1, Republic Square,</strong></p><p><strong>Yerevan, Armenia </strong></p><p><strong>Tel:</strong><strong>. </strong><strong>(+374 10) 515932, </strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong><strong>(+374 94) 757566</strong></p><p><strong>E-mail:</strong><strong> </strong><strong>infoeiti@gov.am</strong></p><p>&nbsp;</p><p><strong>Client: RA Prime Minister&rsquo;s Office</strong></p><p>&nbsp;</p><p><strong>&quot;Armenia Extractive Industries Transparency Initiative Support</strong><strong>:</strong><strong> Additional Financing&rdquo; EGPS Grant No. TF</strong><strong>0</strong><strong>B4808</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Terms of Reference</strong></p><p>&nbsp;</p><p><strong>&nbsp;Consulting sevices for the EITI data systematic disclosing and making publicly accessible </strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>CONTENT</strong>. 2</p><p><strong>ABBREVIATIONS AND DEFINITIONS</strong>. 4</p><p><strong>1.&nbsp; INTRODUCTION</strong>.. 5</p><p><strong>1.1 </strong><strong>&nbsp;Project background</strong>. 5</p><p><strong>1.2 </strong><strong>&nbsp;The Objective of the Systematic Data Disclosure System</strong>.. 6</p><p><strong>2 </strong><strong>&nbsp;SCOPE OF CONSULTING</strong><strong> </strong><strong>SERVICES</strong>. 7</p><p><strong>2.1&nbsp; </strong><strong>Software </strong> 8</p><p><strong>2.2 </strong><strong>&nbsp;Quality assurance</strong>. 9</p><p><strong>2.3 </strong><strong>&nbsp;Deployment</strong>. 10</p><p><strong>2.4 </strong><strong>Data migration</strong>. 11</p><p><strong>2.5 </strong><strong>Training</strong>. 12</p><p><strong>2.6 </strong><strong>Documentation requirements</strong>. 12</p><p><strong>2.7 </strong><strong>Implementation support</strong> 13</p><p><strong>2.8&nbsp; Maintenance</strong>. 14</p><p><strong>3</strong><strong> DELIVERABLES AND SUBMISSION DATES</strong>. 15</p><p><strong>4</strong><strong> </strong><strong>&nbsp;INSPECTION AND TESTS</strong>. 18</p><p><strong>5</strong><strong> </strong><strong>&nbsp;COMMISSIONING AND OPERATIONAL ACCEPTANCE</strong>. 19</p><p><strong>6</strong><strong>&nbsp; </strong><strong>DEFECT LIABILITY</strong>. 19</p><p><strong>7</strong><strong> </strong><strong>&nbsp;REQUIRED COMPANY AND STAFF QUILIFICATIONS</strong>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 20</p><p><strong>ANNEX 1</strong><strong> </strong><strong>&nbsp;TECHNICAL REQUIREMENTS </strong> &nbsp;21</p><p><strong>1.</strong><strong> </strong><strong>General requirements for application software (G)</strong> 21</p><p><strong><em>G01 </em></strong><strong><em>Overall composition of solution</em></strong>. 21</p><p><strong><em>G02 </em></strong><strong><em>Versioning</em></strong>. 23</p><p><strong><em>G0</em></strong><strong><em>3&nbsp; Data archiving</em></strong>. 23</p><p><strong><em>G0</em></strong><strong><em>4</em></strong><strong><em> </em></strong><strong><em>&nbsp;</em></strong><strong><em>Data management</em></strong>. 24</p><p><strong><em>G05 </em></strong><strong><em>Reporting and analytical environment</em></strong>. 25</p><p><strong><em>G06 </em></strong><strong><em>User interface</em></strong>. 25</p><p><strong><em>G07 </em></strong><strong><em>&nbsp;</em></strong><strong><em>On-line help and documentation</em></strong>. 26</p><p><strong><em>G08 </em></strong><strong><em>&nbsp;</em></strong><strong><em>System reliability</em></strong>. 27</p><p><strong><em>G09</em></strong><strong><em> Backup and recovery</em></strong>. 27</p><p><strong><em>G</em></strong><strong><em>10</em></strong><strong><em> </em></strong><strong><em>&nbsp;</em></strong><strong><em>Integration and interoperability</em></strong>. 28</p><p><strong><em>G</em></strong><strong><em>11</em></strong><strong><em> </em></strong><strong><em>Information security</em></strong>. 28</p><p><strong>2.</strong><strong> </strong><strong>Functional requirements </strong><strong>of the application software</strong><strong>(F)</strong> 29</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ABBREVIATIONS AND DEFINITIONS</strong></p><p>&nbsp;</p><table cellspacing=\"0\"><tbody><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;SDD</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;Systematic data disclosure</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;EITI</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>Extractive Industries Transparency Initiative</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;EKENG</p></td><td style=\"vertical-align:top; width:395.75pt\"><p><em>E-Governance Infrastructure Implementation Agency</em></p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>MTAI</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>Ministry of Territiorrial Administration and Infrastucture</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>ME</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>Ministry of Environment</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;SRC</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;State Revenue Committee</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;WG</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;Working group</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;IT</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;Information technologies</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;RA</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;Republic of Armenia</p></td></tr><tr><td style=\"vertical-align:top; width:71.75pt\"><p>&nbsp;IS</p></td><td style=\"vertical-align:top; width:395.75pt\"><p>&nbsp;Information system</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>1. &nbsp;INTRODUCTION</strong></p><p>&nbsp;</p><p><strong>1.1 </strong><strong>&nbsp;Project background</strong></p><p>The Extractive Industries Transparency Initiative (EITI)[1] is a global standard to promote the open and accountable management of natural resources, which has 57 member states. The Republic of Armenia is a member country of the EITI from 9 March, 2017.</p><p>Under the Extractive Industries Transparency Initiative Support Project (hereinafter Project), the Republic of Armenia received a grant from the World Bank, which aims to support Armenia in increasing transparency and accountability in the mining sector through the effective implementation of the EITI Standard.&nbsp; The Project components are: (1) EITI reporting and mainstreaming, (2) Capacity building, (3) Communication and outreach. Project management is carried out by the RA Prime Minister Office (hereinafter <strong>Client</strong>).</p><p>In the value chain of extractive industry, the EITI Standard ensures a well-established, yet meantime a flexible methodology to disclose information and allows controlling the accessibility of information on nationwide payments made by private companies and the revenues that the state generates from extractive sector. It encourages the countries to develop their accountability systems and procedures of EITI data collection, and publish data in a manner of systematic data disclosure. Every country implementing the EITI Standard develops its own procedures for disclosure of information, which meets the specific needs of the given country.</p><p>In 2018-2019 Armenia&#39;s EITI website[2] and nline reporting platform[3] were developed and implemented, through which all metal mining companies and state bodies defines by the legislation submitted EITI public reports in line with the public reporting templates set forth in the Government Decree N 666-N[4].</p><p>&nbsp;</p><p><strong>1.2 </strong><strong>&nbsp;The Objective of the Systematic Data Disclosure System</strong></p><p>Rapidly evolving information technologies dictate their requirements to modernize solutions implemented in all areas. Previously used technologies are being replaced by new, more flexible, effective solutions that need to increase the quality and effectiveness of offered services, enabling the achievement of required and necessary results.</p><p>The need to carry out the works envisaged by this technical description is conditioned by the need to regular publication (disclosure) of the metal mining industry data meets to EITI Standard, based on the principle of open data and to ensure their public accessibility. That work includes both the correction of existing platforms technical and substantive problems and deficiencies, as well as the imperative to implement existing procedures with technologically more modern and effective means, which in turn also follows from the Armenian Government&#39;s decision N 183-L[5] of February 11, 2021 on &quot;Armenia&#39;s Digitization Strategy, on approving the plan of strategy measures and performance indicators&quot;, August 31, 2015. N 1093-N[6] and December 19, 2019 N 1849-N[7] decisions and the documents arising from it, from the standard of requirements for websites published by the Ministry of High-Tech Industry, as well as from the requirements of the EITI.</p><p>Currently, the main problems formed in terms of management of automated business processes in the existing EITI Reporting System are as follows:</p><ul><li>Operators of government agencies regulating the sector manually enter the necessary information into the electronic reporting templates developed for them for publishing the EITI reports. If possible, it is necessary to implement the automatic exchange of electronic data between the stakeholder state bodies and the EITI&rsquo;s SDD information system.</li><li>The information received by the RA communities is presented through electronic reports developed for the Ministry of Territorial Administration and Infrastructure. It is necessary to develop separate reporting forms for RA communities (munnicipalities) and provide the access to relevant users.</li><li>The information provided by the Environmental Protection and Mining Inspection Body is presented through electronic reports developed for the Ministry of Environment. It is necessary to develop separate reporting forms for the Environmental Protection and Mining Inspection Body and provide the access to relevant users.</li><li>Tools for adjusting already submitted reports are missing.</li><li>It is necessary to develop subsections for entering and maintaining data on mining rights for the Ministry of Territorial Administration and Infrastructure, providing for the possibility of entering Subsoil use contracts, Subsoil use rights&rsquo; documents, including acts of mountain allocation.</li><li>The subsections for reflecting summary information on the mining companies is missing.</li><li>The reconciliation of data submitted by state bodies and mining companies is currently carried out by a third party. It is necessary to develop a tool for automatic reconciliation of data submitted by state bodies and mining companies.</li><li>Changing the data in the reference tables affects the previously presented reports. It is necessary to implement the modernization of reference tables&rsquo; data storing by adding the possibility of storing historical data.</li><li>System transparency monitoring functionality and logging mechanism are missing.</li><li>It is necessary to modernize the reporting and analytical tools working with the presented data.</li></ul><p>&nbsp;</p><p>The a.m technical and content problems in the systems adversely affect the rapid response, decision-making, and offering solutions to issues presented by the stakeholders and beneficiaries of the sector. The current state of the information systems of the sector imply that, more human and financial resources are needed to solve existing technical and content problems in information systems than will be required to modernize the automated business processes in those IS and give them a technologically new quality.</p><p>Thus, the purpose of launching of the systematic data disclosure platform and ensuring its public accessibility is to modernize the structure of the existing databases and systems of the stackholders involved in the EITI process and ensure their public access in a way to ensure the following results:</p><ul><li>Elimination of outdated information</li><li>Real-time publishing of up-to-date information</li><li>Minimizing intentional errors</li><li>Ensuring high-quality analysis</li><li>Conducting survey analysis</li><li>Access to open data</li><li>Constant online access to up-to-date information</li></ul><p>&nbsp;</p><p><strong>2 </strong><strong>&nbsp;SCOPE OF </strong><strong>C</strong><strong>ONSULTANT SERVICES</strong></p><p>&nbsp;</p><p>The following main works should be carried out within the scope of the design and development of the SDD IS:</p><ul><li><strong>The Applicant should develop a vision for the modernization &nbsp;&nbsp;of the SDD IS within the defined scope in the framework of the </strong><strong>T</strong><strong>echnical proposal (in accordance with Annex 1 Technical Recuirements), which should describe the information system to be modernized, its database, architecture, technological solutions, stack, functional capabilities, the potential for further development and scaling, etc.</strong></li></ul><ul><li><strong>The Applicant should also develop and present detailed information on the server infrastructure and software tools necessary for the design, development and operation of the SDD IS within the framework of the Technical proposal. In other words, the Applicant should identify the proper menu of IT tools that are needed to implement the platform concept.</strong></li><li><strong>The Consultant should conduct an in-depth study of the EITI SDD IS infrastructure, based on which documentation should be developed, including a detailed technical task</strong><strong> </strong><strong>description, which will be submitted to the Client for approval.</strong></li><li><strong>Based on the approved documentation, including the technical description, as well as the vision presented by during the tender, the Consultant should design and develop the SDD IS within the defined scope, carry out the testing, data migration from the databases of previously operated information systems, staff training.</strong></li><li><strong>&nbsp;At the end of the above-mentioned works, there will be a comprehensive acceptance testing of the SDD IS and pilot operation, as a result of which the identified issues should be corrected by the Consultantat no additional cost. After correcting the problems found in the above phases, retesting should be performed. Only in case of the latter&rsquo;s successful completion handover-acceptance should be carried out, in which case the SDD IS will be considered to enter the warranty service phase, the details of which are presented in sections 2.8 and 6 of this document</strong><strong></strong></li><li><strong>Commissioning of the SDD IS following the requirements of the current document.</strong></li></ul><p>As a result of the implementation of the above-mentioned works, the <strong>Consultant </strong>should handover the SDD IS to the Prime Minister&rsquo;s Office of Armenia (EITI national secretariat) and EKENG.</p><p>&nbsp;</p><p><strong>2.1&nbsp; </strong><strong>Software </strong></p><p>To provide a package of IT tools&nbsp; for the SDD IS , the <strong>Consultant </strong>should ensure that the following requirements are met:</p><ul><li>Agile project management methodology should be used by the <strong>Consultant </strong>throughout the implementation of the project, within which a project management tool (e.g. Jira, Asana, Trello or similar) should be used, to which persons appointed by the EITI, EKENG and the <strong>Consultant </strong>should have access,</li><li>Study business and technical requirements of the IS, the types of competencies of the users, the amount of data to be included in the IS,</li></ul><ul><li>Development of a detailed Technical proposal for the design and development of the SDD IS, approval of the document by the <strong>Client</strong>. This document should include the work schedule, functional, technical descriptions, integration and interoperability specifications of the IS, software architecture, technologies to be used in design, development, plans of testing, deployment, data migration, relevant staff training, SDD IS interface design concept and other necessary descriptions, which will be clarified jointly with the <strong>Client</strong> during the study phase to be carried out by the <strong>Consultant</strong>.</li><li>Software design, development, testing, data migration, pilot release, and implementation of other activities defined by the approved detailed Technical proposal.</li></ul><p>At the end of the project, the <strong>Consultant </strong>should submit to the the <strong>Client </strong>all the source codes of the SDD IS and the documentation according to the defined list. The principles of software code development and quality assurance requirements are defined in later sections of this document.</p><p>&nbsp;</p><p><strong>2.2 </strong><strong>&nbsp;Quality assurance</strong></p><p>The <strong>Consultant </strong>should develop and submit to the CIient the testing and acceptance plan of the SDD IS. The testing plan should at least include the following main sections:</p><ul><li>Testing strategy</li><li>Technical characteristics of testing</li><li>Testing scenarios, including test cases</li><li>Testing environment</li><li>Development of test results</li><li>Change management strategy based on the results of tests.</li></ul><p>The <strong>Consultant </strong>should integrate, carry out and submit results of the following testing phases to the <strong>Client</strong>:</p><ul><li>unit-testing</li><li>integration testing</li><li>system testing</li><li>user acceptance testing</li><li>pilot testing</li></ul><p>The purpose of the <strong>unit and integration testing</strong> phases is to check the performance of the SDD IS at the level of individual functions of subsystems and interconnected functions of subsystems. These phases should be carried out in parallel with the SDD IS development process.</p><p>Unit testing shall be based on standardized, well-known testing frameworks. It should be utilized to ensure better maintainability of the codebase and relatively effortless identification of potential bugs and errors. All parts of the code shall be covered by unit tests. Automated interface testing shall also be performed using well known test automation tools such as Selenium or similar. The <strong>Consultant </strong>will provide all the automated testing related codes (scripts) to the <strong>Client</strong>.</p><p>All business cases supported by the application should have corresponding test cases developed, clearly indicating inputs and outcomes. The overall process shall consider Test Driven Development approach, ensuring that all software functionality will be covered in test cases, and that test cases will be written in advance, and in parallel with development efforts, before fully developing the software, and that software shall contentiously be tested against all test cases. <strong>Acceptance testing</strong> of the software shall also be performed based on developed cases, in cooperation with the <strong>Consultant</strong>.</p><p><strong>Pilot testing</strong> of SDD IS should be performed at the locations listed below:</p><ul><li>EKENG</li><li>State Revenue Committee</li><li>Ministry of Territorial Administration and Infrastructure</li><li>Ministry of Environment</li><li>Environmental Protection and Mining Inspection Body</li><li>Selected communities (municipalities)</li><li>Selected mining companies</li></ul><p>At this phase, the working features of the SDD IS should be tested based on the functions of different user groups.</p><p><strong>User acceptance testing</strong>, during which the following features (situations) of the SDD IS should be tested:</p><ul><li>Management of related IT services</li><li>Installation</li><li>Performance under high load and transaction volumes</li><li>Identification and prevention of intrusions and penetrations</li><li>Information system backup and recovery</li><li>Information recovery</li><li>Recovery of software functionality</li><li>Information system control, monitoring, and alerts</li></ul><p>Testing will be performed based on the agreed up on test cases to be provided by the <strong>Consultant </strong>and approved by the <strong>Client</strong>. Acceptance testing will be done by a group formed by the <strong>Client</strong> and will be consisting of the system&rsquo;s main stakeholders (defined by the <strong>Client</strong>), with the <strong>Consultant</strong>&rsquo;s support, which will also include quality, performance and stress testing. The <strong>Client</strong> reserves the right to form a team of experts (consisting of own staff and/or external experts, other stakeholders) for evaluating the overall solution, its compliance with mentioned requirements, and industry well-known practices.</p><p>All aforementioned tests including GUI and API-related tests shall be automated, whenever possible, using well-known, standard test automation software.</p><p>&nbsp;</p><p><strong>2.3 </strong><strong>&nbsp;Deployment</strong></p><p>In the process of designing and developing the SDD IS, the <strong>Consultant </strong>shall create and maintain three main separate environments: development, staging, and production, which shall be located on EKENG&rsquo;s premises. It shall be possible to provide access to each environment whenever it will be necessary.</p><p>Deployment of the SDD IS shall be carried out in two main phases:</p><ul><li>Beta deployment, during which the group of specialists selected by the <strong>Client</strong> will carry out testing, ensuring that the SDD IS meets all the requirements defined in this document. Issues identified in this phase shall be resolved by the <strong>Consultant </strong>under the direct supervision of the EKENG, after which the group of specialists assigned by the <strong>Client</strong> will test the SDD IS again, to ensure that issues are resolved and defined requirements are met. This process will be reinitiated until all issues will be resolved.</li></ul><ul><li>Deployment, which will be carried out before the commissioning of the SDD IS. Problems encountered during operation should be corrected by the <strong>Consultant </strong>before the initiation of the pilot program. Issues identified during the pilot programs shall also be resolved by the <strong>Consultant</strong>.</li></ul><p>For IS deployment, the <strong>Client</strong> must provides with an appropriate IS deployment environment, the specifications of which shall be presented during the tender stage. The minimum and recommended requirements for the infrastructure shall be provided by the <strong>Consultant.</strong></p><p>&nbsp;</p><p><strong>2.4 </strong><strong>Data migration</strong></p><p>To perform data migration, the <strong>Consultant </strong>must develop and submit a detailed migration plan to the <strong>Client</strong> for approval, based on which the <strong>Consultant </strong>will carry out the migration with EKENG&rsquo;s support.</p><p>The <strong>Consultant </strong>shall also submit the list of specialists who will carry out the migration in EKENG&rsquo;s premises, to the <strong>Client</strong>&rsquo;s for approval</p><p>Data migration from the existing platform to the UIS will be performed by the <strong>Consultant </strong>, in EKENG&#39;s premises, using the latter&#39;s hardware, and with collaboration with the EKENG&#39;s team.</p><p>Data migration includes data profiling, data cleansing, data validation, and the ongoing data quality assurance process in the target system. The data migration strategy and plan should consider the following:</p><ul><li>all historical data;</li><li>consider duplicate as well as unconfirmed data cleansing;</li><li>data conversion (new meta-data and design of tables and modules);</li><li>all the risks accompanying the data migration process.</li></ul><p>The <strong>Consultant </strong>will be responsible for data cleansing, developing validation rules, applying and testing them, with EKENG&rsquo;s support and all the latter will require EKENG&rsquo;s approval. Validation tests should at least include schema validation, cell-by-cell comparison, reconciliation checks for all columns, NULL validation, ad-hoc testing. All the tests shall be automated, minimizing manual intervention.</p><p>&nbsp;</p><p><strong>2.5 </strong><strong>Training</strong></p><p>Within the scopes of the works provided for in this document, the <strong>Consultant </strong>shall carry out comprehensive training of system users and responsible employees performing system maintenance (administrators, programmers).</p><p>A detailed training plan shall be developed by the <strong>Consultant </strong>and presented to the <strong>Client</strong>&rsquo;s for approval. The training plan shall at least include the training methodology, rationale for defining training groups, the content of the training materials, training schedule, and the knowledge assessment methodology. Within the scope of this document, the <strong>Consultant </strong>shall conduct training for the following main groups:</p><ul><li>&nbsp;<strong>Training of Trainers (ToT)</strong> &ndash; This should enabe <strong>Client</strong> to carry out training for employees of state bodies regulating the mining sector and all metal mining companies by 10-15 future trainers assigned by the latter to be trained by the <strong>Consultant </strong>. This will be made possible through a training program developed and carried out by the <strong>Consultant </strong>which will enable trainees to acquire all the necessary skills and knowledge, to train their peers.</li><li><strong>Training for system administrators </strong>&ndash; This training should be carried out for system administrators (3-4 specialists), as a result of which, system administrators should acquire all the necessary skills and knowledge for the technical management and use of SDD IS.</li><li><strong>Technical training</strong> &ndash; This training should be carried out for the technical staff (5-10 specialists), who will be responsible for software maintenance of the SDD IS.</li></ul><p>The <strong>Consultant </strong>shall develop and provide all training, methodology, and audiovisual materials, which shall be in printed, digital, audio/video formats.</p><p>&nbsp;</p><p><strong>2.6 </strong><strong>Documentation requirements</strong></p><p>Within the scope of IS implementation the <strong>Consultant </strong>shall prepare and provide to the <strong>Client</strong> the following documentation:</p><ul><li>System documentation, providing an overview of the underlying technology;</li><li>Requirements documentation, including business rules, use cases, and user stories;</li><li>Software architecture documentation, including designed APIs, and diagrammatic representation of the overall system and underlying infrastructure;</li><li>Maintenance documentation, describing limitations and known problems within the system and implemented solutions; dependencies between system components shall also be presented in this document;</li><li>Network topology of all layers, including physical and logical, firewalls, IPS/IDS systems and corresponding recommended configurations, hardware interconnections;</li><li>User&rsquo;s manual;</li><li>Administration (system use) manual;</li><li>Installation manual;</li><li>Deployment manual;</li><li>Support manual;</li><li>Operation manual, including the commissioning plan;</li><li>Failure management manual.</li></ul><p>Documentation shall be provided both in a searchable text format (e.g. PDF, Word, etc.) and on an open-source, web-based repository, such as wiki.js, or the proprietary option offered by EKENG (e.g. Confluence) which will enable easier search, maintenance, and use. API documentation should be designed and delivered using frameworks that will reduce efforts for future maintenance and development (e.g. Swagger).</p><p>The system should have role-based user manuals in the Armenian language. English can be considered acceptable for technical documentation. The manuals should also be accessible through the system interface. The System should also include online help topics with necessary instructions. This help would be accessible directly from every part of the user interface.</p><p>Following project management documents should be provided by the <strong>Consultant </strong>during the implementation of this project:</p><ul><li>Project Management Plan</li><li>Quality Management Plan</li><li>Risk Management Plan</li><li>Training Plan</li><li>Deployment Plan</li><li>Warranty and Technical Support Plan</li></ul><p>The <strong>Consultant </strong>will be responsible for keeping all documentation up to date during the warranty period in case of changes to the system environment, features or configurations in the event of system changes, functional features and operational changes.</p><p>The <strong>Consultant </strong>shall clearly define the descriptions of the manuals to be provided with the system, their updating procedures, and the template for their corresponding digital format.</p><p>&nbsp;</p><p><strong>2.7 </strong><strong>Implementation support</strong></p><p>&nbsp;</p><p>The <strong>Consultant </strong>shall work on establishing a standard environment, policies, and guidelines for the deployment of SDD IS in data center provided by the <strong>Client</strong>. The environment includes building modern development continuous integration/continuous delivery pipelines based on DevOps best practices which separate environments for development, staging, and production.</p><p>Software components should be packaged up with all dependencies, enabling the application to run reliably on any infrastructure, while remaining isolated from its running environment.</p><p>&nbsp;</p><p><strong>2.8&nbsp; Maintenance</strong></p><p>After the official handover-acceptance of the SDD IS, the <strong>Consultant </strong>together with EKENG shall prepare a one-year Service Level Agreement (SLA) for the system and submit it to the <strong>Client</strong> for approval. The warranty shall at least cover software updates, and the release of new versions aimed to fix identified bugs, issues, and errors, depending on the severity of the latter.</p><p>During the warranty period, the <strong>Consultant </strong>shall be guided by the conditions/methodologies for the correction of errors or bugs during operation. It is also necessary to develop a software updating and patching strategy which will be prepared by the <strong>Consultant </strong>and approved by the <strong>Client</strong>.</p><p>Software errors can cause malfunctions and consist of the following main groups:</p><ul><li>accuracy and completeness of the input data are not maintained in the databases,</li><li>calculation fields in the databases do not reflect the correct values due to errors in the corresponding formulas,</li><li>operations to be performed in a single transaction are not carried out accordingly,</li><li>reports do not reflect the real results,</li><li>the software does not handle errors appropriately, throws fatal errors, and closes the application without user&rsquo;s intervention,</li><li>software response latency issues that are not due to database transactions.</li></ul><p>Details regarding all possible error categories shall be developed by the <strong>Consultant </strong>and reflected in the relevant Service Level Agreement (SLA) to be approved by both the <strong>Client</strong> and the Consultant.</p><p>Software bugs include issues that do not affect the integrity of the data, the accuracy and completeness of reports. The latter shall also be specified in the Service Level Agreement (SLA) and approved by both the <strong>Client</strong> and the Consultant. The warranty period for the SDD IS will begin only if the IS is deployed on the hardware belonging to <strong>Client</strong> which corresponds to the minimum requirements defined by the Consultant.</p><p>During the warranty period, all identified issues (errors, bugs, etc.) shall be submitted by the EKENG to the <strong>Consultant </strong>in written format, describing details and time when it was identified.</p><p>The warranty terms to be set out in the Service Level Agreement (SLA) must include at least the following:</p><ul><li>If the issues affect the main functions of the system (it is not possible to enter data or the input is done with errors, it is not possible to receive the necessary outputs during the reporting period), then the problem must be resolved within 12 hours of notification.</li><li>All issues identified by the <strong>Client</strong> as non-critical issues shall be combined in a new release and be submitted to the <strong>Client</strong> within 1 business day.</li><li>Hotline (telephone) consultation should be provided to information system users on business days from 9:00 to 18:00.</li></ul><p>&nbsp;</p><p><strong>3</strong><strong> DELIVERABLES AND SUBMISSION DATES</strong></p><p>The main works envisaged within the framework of the development and implementation of the systematic data disclosure system should be carried out in the following main phases:</p><ul><li><strong>First phase: Research and definition of requirements</strong></li><li><strong>Second phase: Development of the information system</strong></li><li><strong>Third phase: Deployment, documentation, testing, and training</strong></li><li><strong>Fourth phase: Commissioning of the SDD IS for operation</strong></li></ul><p>&nbsp;</p><p><strong>First phase: Research and definition of requirements</strong></p><p><strong><u>Action plan</u></strong></p><ul><li>Develop a project action plan</li><li>Submit the project implementation action plan to the <strong>Cilent</strong>&rsquo;s for approval.</li></ul><p><strong><u>Defining Requirements: Research and Studies</u></strong></p><ul><li>Meetings and discussions with those responsible for the field</li><li>Study of business requirements of the SDD IS</li><li>Study of technical requirements of the SDD IS</li><li>Study of the types of roles of the SDD IS users</li><li>Research on the amount of data to be included in the SDD IS.</li></ul><p><strong><u>Description of technical solutions</u></strong></p><ul><li>Defining specifications of the information system</li><li>Classification of information and defining user permissions and privileges</li><li>Design and development of detailed technical task description</li><li>Development of testing and admission plan</li><li>Development of a training plan</li><li>Submission of a detailed technical assignment, testing and admission plan, training plan to the <strong>Client</strong></li></ul><p><strong>Expected results of the implementation of the first phase of work</strong></p><ul><li>Approved project implementation action plan</li><li>Approved testing and admission plan, training plan</li><li>Approved detailed technical task description to design, develop, implement and operate of the SDD information system</li><li>Description of necessary technical means</li><li><strong>First phase report</strong></li></ul><p>&nbsp;</p><p><strong>Second phase: Development of the SDD IS</strong></p><p>According to the approved (by the <strong>Client</strong>) detailed technical specification, the following actions should be carried out to design, develop and implement the SDD information system:</p><p><strong><u>Creation of the SDD IS</u></strong></p><ul><li>Design and development of the SDD IS databases</li><li>Software development of the SDD IS</li><li>The SDD IS interface design</li><li>Alpha, functional and simultaneous testing of several users</li><li>Beta testing</li><li>Presentation of the preliminary version of the SDD IS</li></ul><p>&nbsp;</p><p><strong><u>Pilot deployment of the SDD IS</u></strong></p><ul><li>Trial deployment of the initial version of the SDD IS</li></ul><p>&nbsp;</p><p><strong>Expected results of the second phase of work</strong></p><ul><li>The initial version of the SDD IS</li><li><strong>Second phase report</strong></li></ul><p>&nbsp;</p><p><strong>Third phase: Deployment, documentation, testing, and training</strong></p><p><strong><u>Deployment:</u></strong></p><ul><li>Installation on the prospective servers and workstations</li><li>Complete deployment of the SDD IS</li></ul><p><strong><u>Documentation:</u></strong></p><ul><li>User&rsquo;s manual</li><li>Administration (system use) manual</li><li>Installation manual</li><li>Deployment manual</li><li>Operation manual, including including the commissioning plan</li><li>Support manual</li><li>Failure management manual</li><li>The updated version of the technical requirements</li><li>Development of Help system and integration into the SDD IS</li><li>Development of a one-year service level agreement (SLA) of the SDD IS and submission to the <strong>Client</strong> for approval and signing</li></ul><p>&nbsp;</p><p><strong><u>Testing:</u></strong></p><ul><li>Final testing, including stress and load testing</li><li>User acceptance testing.</li></ul><p>&nbsp;</p><p><strong><u>Training</u></strong></p><ul><li>Preparation of a list of specialists to be trained</li><li>Training of Trainers (ToT), training of technical staff and IS administrators.</li></ul><p>&nbsp;</p><p><strong>Expected results of the third phase of work</strong></p><ul><li>Trained professionals who will have relevant knowledge and skills to use and manage the system</li><li>Third phase report, including:<ul><li>Source codes of the system (with relevant descriptions)</li><li>Database dump</li><li>User&rsquo;s manual</li><li>Administration (system use) manual</li><li>Installation manual</li><li>Deployment manual</li><li>Support manual</li><li>Operation manual</li><li>Failure management manual</li><li>Updated version of the technical requirements</li></ul></li><li>Approved Service Level Agreement (SLA) for one-year system warranty service</li></ul><p>&nbsp;</p><p><strong>The fourth phase: the commissioning of the SDD IS </strong></p><p><strong><u>Delivery of the IS, pilot operation</u></strong></p><ul><li>Approved act of the SDD IS delivery</li></ul><p>&nbsp;</p><p><strong>Expected results of the implementation of the fourth phase of work</strong></p><ul><li>A fully functional SDD IS</li></ul><p>&nbsp;</p><p><strong>5 </strong><strong>&nbsp;INSPECTION AND TESTS</strong></p><p>Comprehensive testing of the SDD information system must be conducted before the system is put into operation. The <strong>Consultant </strong>must prepare test plans that will be approved by the <strong>Client</strong>. All test plans must include scenarios agreed with the <strong>Client</strong> to ensure thorough and proper testing of the system before deployment.&nbsp;</p><p>Acceptance testing will be done by <strong>Client</strong>, or a group formed by the system&rsquo;s main stakeholders from EKENG, Prime Minister&rsquo;s Staff, SRC, MTAI, ME with the <strong>Consultant </strong>&rsquo;s support, which will also include load and stress testing.</p><p>The <strong>Client </strong>reserves the right to form a team of experts (consisting of own staff and/or external experts, other stakeholders) for evaluating the overall solution, its compliance with mentioned requirements, and industry well-known practices.</p><p>A group consisting of EKENG, Prime Minister&rsquo;s Staff, SRC, MTAI, ME specialists, based on <strong>Clinet</strong>&rsquo;s decision, will be assigned to participate in testing to validate its results and to verify that it meets all the functional and non-functional requirements, that it has been configured and customized properly, and performs satisfactorily, including the tests of successful data consolidation, data migration, data entry, update and processing, report generation, etc. Users will work from test scenarios developed jointly by the <strong>Consultant</strong>, and the working group assigned by the <strong>Client</strong> as needed.&nbsp; As each scenario is completed, the user will note whether the test was completed satisfactorily and whether there were any errors or unexpected results.&nbsp; The <strong>Consultant </strong>must remediate any identified issues.&nbsp; Any features or functionalities that failed the testing, must be retested once remediate.</p><p>After testing, the <strong>Consultant </strong>should prepare a summary of the test results and should outline the steps that will be taken to address any issues or problems identified. In the event of any disputes about the conduct or results of testing, EKENG will provide to the <strong>Consultant </strong>in writing a description of the issues with specific recommendations on how to address them. The <strong>Consultant </strong>must take appropriate steps to resolve any disputes or provide satisfactory clarification as earliest.</p><p>&nbsp;</p><p><strong>5</strong><strong> </strong><strong>&nbsp;COMMISSIONING AND OPERATIONAL ACCEPTANCE</strong></p><p>Codebase: The code will be residing on EKENG&rsquo;s repository with all branches (at least develop, staging and production), and corresponding branch policies enforced.</p><p>Pipelines: Fully functional CI/CD pipelines with all automated test scripts will be deployed a functional, build, and deployment processes automated without requiring any manual intervention, except when deploying in the production environment. The process of deployment in the production environment will be defined by EKENG. All the mentioned configurations will be integrated in EKENG&rsquo;s environment.</p><p>After successfully passing the acceptance testing, the rollout will be performed based on a commissioning plan to be presented by the <strong>Consultant </strong>and approved by the <strong>Client</strong>.</p><p>The commissioning plan shall be developed considering:</p><ul><li>Availability and readiness of trained users prior to commissioning</li><li>Minimal service disturbances</li><li>Parallel rollout with existing systems ensuring a rollback strategy if necessary</li><li>Continuous monitoring, and availability of a feedback loop, ensuring proper collection, analysis, and actions if necessary.</li></ul><p>Metrics and monitoring setups shall be included in the commissioning plan, aimed to enable analyzing human and system behaviors during the rollout. Performance indicators, such as availability, reliability, and response time of the application should not be changed or severely affected by added load, or new features. Monitoring tools should be available and configured to track performance before, during, and after deployment, and increases the user base, to ensure performance does not degrade.</p><p>Details of metrics to be monitored shall be defined and details included in the commissioning plan, provided by the <strong>Consultant </strong>and approved by the <strong>Client</strong> and EKENG. Such tracking metrics shall include but not be limited to page load time, errors, uptime, transaction durations, etc.</p><p>The <strong>Client</strong> will be responsible for the approval that the system is fully functional and stable, after which the commissioning will be considered successful.</p><p>&nbsp;</p><p><strong>6</strong><strong>&nbsp; </strong><strong>DEFECT LIABILITY</strong></p><p>The <strong>Consultant </strong>warrants that the whole systems with the underlying subsystems and other components are free from any defects. Any issues identified throughout the whole lifecycle of the project and at least 1 year after commission of the SDD information system shall be resolved by the <strong>Consultant </strong>without any additional cost.</p><p>All issues identified shall be resolved promptly, based on the severity of identified issues, such issues should be resolved within an agreed-on timeframe. The required timeframe for resolving issues are defined as follows:</p><ul><li>Critical &ndash; 12 hours</li><li>Major &ndash; within 1 (working) day</li><li>Minor &ndash; within 3 (working) days&nbsp;</li></ul><p>The severity of issues is defined by EKENG, based on developed guidelines by the <strong>Consultant </strong>and approved by <strong>Client</strong>.</p><p>&nbsp;</p><p><strong>7</strong><strong> </strong><strong>&nbsp;REQUIRED COMPANY AND STAFF QUILIFICATIONS</strong></p><p>The qualifications and experience of the <strong>Consultant </strong>and its staff must meet the minimum requirements below:</p><ul><li>The company must have at least 5 years of experience in developing public management information systems in RA.</li><li>The company must have at least 2 successfully implemented and commissioned similar public management information systems within the last 5 years. The company must submit reference letters certifying the proper and timely implementation of the works from the main customers of the above-mentioned systems.</li><li>The Company should have a at least the following staff:<ul><li><ul><li>1 Team Leader with university degree in IT, Computer Science and/or other relevant university degree with at least 5 years of working experience in the IT sector, as well as strong coordination and team leading skills.</li><li>1 web/UI designer with relevant university degree and at least 3 years of working experience in web/UI design.&nbsp;</li><li>1 frontend developer with relevant university degree and at least 3 years of working experience in computer programming (frontend development).</li><li>2 backend developers with relevant university degree and at least 3 years of working experience in computer programming (backend development).</li><li>1 database specialist with relevant university degree and at least 5 years of working experience in computer programming.</li><li>1 devops specialist with relevant university degree and at least 5 years of working experience in computer programming.</li><li>1 information security specialist with relevant university degree and at least 5 years of working experience in computer programming.</li></ul></li></ul></li></ul><p>&minus;&nbsp;&nbsp;&nbsp;&nbsp; 1 mining specialist with relevant university edegree and at least 5 years of working experience in the mining sector with strong professional skills, who will guide the Applicant team to visualize and understand the platform concept.</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>ANNEX 1</strong></p><p><strong>TECHNICAL REQUIREMENTS</strong></p><p>This section presents the technical requirements to which the poposal of the <strong>Applicant </strong>must comply.</p><p><strong>1. </strong><strong>General requirements for application software (G)</strong></p><p>Following is the list of areas for general requirements:</p><ol><li>Overall composition of solution and requirements regarding the systems architecture</li><li>Versioning of solution</li><li>Archiving of data</li><li>Database system software</li><li>Reporting and analysis environment</li><li>User interface software</li><li>On-line help</li><li>Reliability requirements, i.e. fault tolerance and disaster recovery</li><li>Backup and recovery requirements</li><li>Requirements for support of integration</li><li>Security and data privacy requirements, i.e. in the area of information management and users&rsquo; management.</li></ol><p>&nbsp;</p><p><strong><em>G01 </em></strong><strong><em>Overall composition of solution</em></strong></p><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>01. </em><strong><em>Overall composition of solution</em></strong><em> </em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS shall assure compatibility with various operating systems, being optimized for Apache/nginx web server operating in Linux or other UNIX operating systems.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS page link shall be implemented in xHTML1.0 language, as per W3C standards, if needed HTML 5 may also be used.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS should be adaptive or responsive, assuring maximum use by computers, mobile phones and tablets.&nbsp;&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS shall have a content management system (CMS), which shall allow people with nonprofessional technical knowledge (no knowledge of programming languages) to manage the portal structure, as well as replenish the content of the page and add new sections. The CMS of the portal shall have a number of user servicing options with different levels of authorizations.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.005</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS shall have a global search system, which will allow searching in any section of the system. More comfortable and efficient search system shall be developed to ensure convenience of presenting information. It shall contain text, multilingual search, search by date, thematic search, and expanded search.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.006</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The user shall be able to subscribe to frequently updated sections of the portal, such as to the media center.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.007</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>In the lower part of any page of the SDD system, a special module shall be placed to allow disseminating the given page in social media networks, such as Facebook, X(Twitter), Live Journal, GOXI, YouTube, etc.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.008</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS shall allow creating unlimited number of static HTML pages.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.009</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The structure of the SDD IS, the user interface and source codes shall comply with the requirements of RoA legal acts (specifically to GoA Decree No. 1521-N, dated December 26, 2013 on &ldquo;Approving the Minimum Requirements for Official Websites of State Bodies in the Internet&rdquo;).</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.010</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to implement a subsystem of reference tables in the SDD IS, which should have the following capabilities:</p><ol><li>Reference table has validity period</li><li>Reference table item has validity period</li><li>It is possible to use reference table content as it was in any moment of time in past and current state</li><li>It is possible to apply business rules to control validity period consistency</li><li>It is possible to configure relations between reference tables and between data items</li><li>Reference table can be a hierarchy and system must ensure data consistency</li><li>It is possible to apply system rules to enforce uniqueness of data elements</li></ol></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G01.011</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS must provide full history of reference data.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong><em>G02 </em></strong><strong><em>Versioning</em></strong></p><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>2</em><em>. </em><em>Versioning requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>2</strong><strong>.01</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The <strong>Consultant </strong>shall provide the tools for automated migration from one version of SDD IS to next version of SDD IS, i.e. but not limited to following:</p><ol><li>Automatic implementation of change of the data from older data model to the new data model;</li><li>Automatic transfer and/or change of the settings associated with the transition to the new version.</li></ol><p>The <strong>Consultant </strong>shall provide complete and detailed documentation for transition from old version to next version of the SDD IS.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>2</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Annual release of SDD IS shall include at least following improvements to the software:</p><ol><li>Updates for web applications to support last stable releases of following major browsers:<ol><li>EDGE (Microsoft)</li><li>Safari (Apple)</li><li>Firefox (Mozilla)</li><li>Chrome (Google)</li></ol></li><li>Improvements for known problems</li></ol></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G0</em></strong><strong><em>3&nbsp; Data archiving</em></strong></p><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>3</em><em>. </em><em>Archiving requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>3</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS must have operational data archiving tools. At least the following functionality should be implemented:</p><ol><li>Ability to archive historical data according to pre-defined parameters e.g. age, period, etc.;</li><li>Ability to view/search archived data;</li><li>Ability to retrieve and reactivate archived data;</li><li>Ability to control access to fields on forms, templates, documents and other data based on defined roles and access rights.</li></ol></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>3</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>All removable data must be archived with the opportunity to get restored from the archive into the actual system.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>3</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS should provide clear, simple and fully documented procedure for data backup and data restoration from the archive.</p><p>SDD IS must ensure that such restoring from backups is accomplished in ways that do not compromise security protection (trusted recovery service).</p><p>The <strong>Applicant</strong> is requested provide description about how SDD IS ensure such trusted recovery service.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G0</em></strong><strong><em>4</em></strong><strong><em> </em></strong><strong><em>&nbsp;</em></strong><strong><em>Data management</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>4</em><em>. </em><em>Data management requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The <strong>Consultant </strong>shall provide complete administration manual for SDD IS database administrators, which prescribes all needed procedures for proper administration of all databases, which are part of the system.</p><p>Amongst others aspects, this administration manual shall include procedures, guidelines, and methods for effective data planning, analysis, standards, modelling, configuration management, storage, retrieval, protection, validation, and documentation.</p><p>The<strong> Applicant</strong> is requested provide description of the administration manual.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall have the means to download and upload application data via a text file (ASCII format).</p><p>SDD IS shall perform all necessary checks of the loaded data, including data integrity and compliance with data stored in the System.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide capability to invoke application integrity checking for data, program modules, data files and other components, which are part of the system.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide an opportunity to automatically prevent user access to the system, stop the user in the system in case of damage of software modules, data files, data corruption or any other type of integrity errors.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.005</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>There are shall be complete audit trail of all data changes in any table in components of SDD IS; audit trail must include at least following data:</p><ol><li>User data</li><li>Authorisation, which was used for accessing the data and functions of the system</li><li>Details of the action, which were applied by user</li><li>Initial state before action</li><li>Timestamp of the action</li><li>&nbsp;Device details, from where user accomplished the activity</li></ol></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.006</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The system must have means for analysing the history of data changes.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>4</strong><strong>.007</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide capabilities for the integration with external systems providing complete, comprehensive and well-documented interface to any data in the system.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G05 </em></strong><strong><em>Reporting and analytical environment</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>05. </em><em>Reporting and analytical environment requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>5</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall have available the specialised tool (reporting tool) for creating print-ready and interactive reports of an arbitrary shape based on the data stored in the system with or without parameters. It shall support dashboard type visualisation components such as gauges, sliders, checkboxes, map etc.</p><p>It shall be possible to save reports and queries definitions for later use.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>5</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It shall be possible to export all reports into standard formats, i.e. MS Office, PDF, XML, JASON, CSV and HTML.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>5</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Overall centralised SDD IS access control shall be enabled for controlling the access to data by reporting tool users.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G06 </em></strong><strong><em>User interface</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>06. </em><em>User interface requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS software must provide on-line access to all requested functions to all users using web browser, in accordance with RA Government Decree No. 572-N of May 25, 2017.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The user interface (UI) design of the SDD IS shall be attractive and assure maximum usability. The <strong>Service provider</strong>, in collaboration with the <strong>Client</strong>, shall present the graphical design (with alternative options) of the system.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>All components of the SDD IS shall be of three languages (Armenian, English and Russian). All texts shall be Unicode (UTF-8) encoded to support the texts in all the languages.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.00</strong><strong>4</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall ensure user friendliness, i.e. through following techniques:</p><ol><li>All activities, which are not require input from person must completely automated;</li><li>There shall be no need for double entry of information by user;</li><li>In every place where data into business forms can be prefiled based on information in SDD IS or in integrated external systems, SDD IS functionality must provide automatic pre-filling of data.</li></ol><p>The <strong>Applicant</strong> is requested to provide description of how SDD IS addresses those principles.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.00</strong><strong>5</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall assure maximum compatibility with the existing main browsers, such as Microsoft EDGE, Mozilla Firefox, Opera, Safari, Chrome, etc.&nbsp;&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>6</strong><strong>.00</strong><strong>6</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The color and style solutions should comply with the solutions provided in the EITI&#39;s official website (www.eiti.org).&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G07 </em></strong><strong><em>&nbsp;</em></strong><strong><em>On-line help and documentation</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>7</em><em>. </em><em>On-line help requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>7</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall have built-in context-sensitive online help system, working in real time, in the languages as specified in the requirement G06.003.</p><p>SDD IS shall provide convenient search capabilities for end users to search for the information about system capabilities.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>7</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide user interface for management of the content of the on-line help and users&rsquo; manuals.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>7</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>At the end of the implementation phase the <strong>Consultant </strong>should provide complete documentation about internal organisation and functional capabilities of the SDD IS. At least following documentation shall be enabled on Armenian, and English languages:</p><ol><li>System administration manual</li><li>User manual</li><li>Technical description of SDD IS modules</li><li>Integration developers and administration manual</li></ol></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G08 </em></strong><strong><em>&nbsp;</em></strong><strong><em>System reliability</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>8</em><em>. </em><em>Reliability requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>8</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS and its data shall not be damaged as a result of a power failure.</p><p>The <strong>Applicant</strong> is requested to provide information about how proposed SDD IS is handling this requirement.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>8</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The functionality of the system shall be automatically restored without loss of data integrity at the power supply is resumed.</p><p>The <strong>Applicant</strong> is requested to provide information about how proposed SDD IS is handling this requirement.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>8</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide an opportunity to prevent an overflow of data files and storage capacity.</p><p>The <strong>Applicant</strong> is requested to provide information how the above is controlled and prevented.</p></td></tr></tbody></table><p><strong><em>G09</em></strong><strong><em> Backup and recovery</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>0</em><em>9</em><em>.&nbsp; </em><em>Backup and recovery requirements</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>9</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall ensure procedures for automatic backup of the system and the data.</p><p>The <strong>Applicant</strong> is requested to provide description on existing automated back up procedures in the SDD IS.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>9</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall enable full and partial backup of the system and support scheduling for different period of times different types of backups.</p><p>SDD IS shall enable a full backup of the system as well as backup of changes (cumulative incremental backup).</p><p>SDD IS shall provide tools to automatically run scheduled backup procedures.</p><p>SDD IS shall provide means for launching backup procedures manually.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>9</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide checks of copies for data integrity.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G0</strong><strong>9</strong><strong>.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p><strong>Consultant </strong>is requested to provide a clear and comprehensively documented procedure for the system recovery.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G</em></strong><strong><em>10</em></strong><strong><em> </em></strong><strong><em>&nbsp;</em></strong><strong><em>Integration and interoperability</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>10</em><em>.&nbsp; </em><em>Requirements for support of integration</em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>10</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to implement interoperability with external websites or databases, for example, with the information systems` databases of the State Register of Legal Entities of the RA Ministry of Justice, the State Revenue Committee, RA communities, etc. Interoperability must be carried out in accordance with the requirements of the RA Government Decree 1093-N of August 31, 2015.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>10</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Integration specified in the requirement G10.001 should be implemented using standard web services technologies. The <strong>Consultant </strong>must implement the web services not only in the SDD IS, but also in external systems.</p></td></tr></tbody></table><p>&nbsp;</p><p><strong><em>G</em></strong><strong><em>11</em></strong><strong><em> </em></strong><strong><em>Information security</em></strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>11</em><em>. </em><strong><em>Information security requirements</em></strong></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>11</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The content management system of the SDD IS (CMS) shall be accessible only from authorized addresses (through VPN) and mandatorily in case of availability of SSL certificates.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>11</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall enable to manage user profiles, as well as define validity period of the user profile and working hours of respective users.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>11</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Access to the SDD IS must be carried out using strict identification mechanisms, in accordance with the RA Governmen Decree No. 572-N of May 25, 2017.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>G</strong><strong>11</strong><strong>.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>SDD IS shall provide control over a user login into the system, including but not limited to following:</p><ol><li>Number of allowed attempts (i.e. the number of unsuccessful login attempts, after which the user&rsquo;s account is automatically locked);</li><li>Time of user inactivity inside of the sessions, following which the user is automatically disconnected from the system;</li><li>Automatic locking of the user account, if relevant user has not logged into the System over the defined time.</li></ol><p>SDD IS must provide the possibility to configure the above-mentioned parameters.</p></td></tr></tbody></table><p><strong>2</strong><strong>.</strong><strong> </strong><strong>Functional requirements </strong><strong>of the application software</strong><strong>(F)</strong></p><p>Below are the functional requirements for all components of the SDD IS.</p><table border=\"1\" cellspacing=\"0\" style=\"width:605px\"><tbody><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>01. </em><em>O</em><em>nline reporting system</em><em> requirements</em><em> </em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Mining companies and relevant State Authorities should submit reports on Online Reporting System at least once a year before 1 August of the year following the reporting year or within another period established by law, electronically.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Companies and State Authorities must have user accounts on the platform that meet the requirements in section G11.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The information received by the RA communities is presented through electronic reports developed for the Ministry of Territorial Administration and Infrastructure. It is necessary to develop separate reporting forms for RA communities (municipalities) and provide the access to relevant users.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The information provided by the Environmental Protection and Mining Inspection Body is presented through electronic reports developed for the Ministry of Environment. It is necessary to develop separate reporting forms for the Environmental Protection and Mining Inspection Body and provide the access to relevant users.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.005</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Users, accessing the system, shall be able to complete the public reports for the reporting year, as well as download approved public reports for previous years. Online reports of the reporting year should be in line with the forms of reports prescribed by the Government Decree N 666-N of June 8, 2018.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.006</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Users must be able to upload documents in doc, xlsx and pdf formats at the end of each report, in order to provide supporting documentation for the report.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.007</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>After completing the report, the user shall be able to save it as a draft or send it. While sending the report the system shall request signing with ID card by placing it in the corresponding equipment, as a result of authentication, the system shall not only save the data in the database but also compile a PDF file with the electronic signature.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.008</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to modernize all reporting forms in the system.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.009</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Tools for adjusting reports need to be developed so that a state authorities or mining companies that discovers an error in their already submitted reports before the reporting deadline can submit an adjusted report.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.010</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The system should save the adjusted report in the current status, while at the same time saving the previously submitted report in the database.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.011</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The SDD IS must have a tool for creating new reporting forms and modifying existing reporting forms. Through this tool, the administrator of the SDD IS should have the opportunity not only to add/modify reporting forms, but also to specify their validation and business rules.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.01</strong><strong>2</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to develop automatic exchange of electronic data between the interested state bodies and the EITI portal. In particular,</p><ul><li>It is necessary to develop web services to receive data from the tax and customs systems of RA SRC.</li><li>It is necessary to develop a web service to retrieve real estate tax and vehicle property tax data.</li><li>It is necessary to develop a web service to receive data on beneficial owners from the State Register of Legal Entities.</li><li>It is necessary to develop a web service to receive data from electronic systems of communities (municipalities).</li></ul><p>Web services must be developed taking into account the requirements specified in section G10.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.0</strong><strong>13</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to develop a tool for reconciliation the data presented by state bodies and mining companies. The differences revealed as a result of the reconciliation must be presented to the <strong>Client</strong> in the form of a report.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>01.01</strong><strong>4</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to develop subsystems for entering and maintaining data on mining rights for the Ministry of Territorial Administration and Infrastructure, providing for the possibility of entering and saving contracts, permits (mining rights) documentation.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:375.6pt\"><p>&nbsp;</p></td></tr><tr><td colspan=\"2\" style=\"background-color:#d9d9d9; width:16.0cm\"><p><em>02. </em><em>Data center requirements</em><em> </em></p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.001</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The Data center must graphically illustrate the aggregated and disaggregated data presented by mining companies and state bodies over the years.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.002</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Various types of graphs and reports will be generated according to the agreed parameters with the <strong>Client</strong>, in particular by presenting number of reporting companies, number of reconciled reports, data on extraction, exports, taxes and other payments, license fees, social-econimic and charitable contributions, environmental data, number of employees, etc.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.003</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>Users should be able to carry out their analysis and get graphical results through different filters (e.g. by reporting companies, reporting periods, by data fields) also by ensuring data download in image and csv, xlsx, json formats.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.004</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The reports in the data center must meet the requirements specified in section G05.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.0</strong><strong>05</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>The approved public reports submitted by all mining companies and state bodies should be accessible and downloadable in the &quot;Data Center&rdquo; in open data format.</p></td></tr><tr><td style=\"vertical-align:top; width:78.0pt\"><p><strong>F</strong><strong>0</strong><strong>2</strong><strong>.0</strong><strong>06</strong></p></td><td style=\"vertical-align:top; width:375.6pt\"><p>It is necessary to develop a subsection for reflecting summary information on mining companies.</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>[1] https://eiti.org/</p><p>[2] https://www.eiti.am</p><p>[3] https://reports.eiti.am/hy/</p><p>[4] https://www.arlis.am/DocumentView.aspx?DocID=132674</p><p>[5] https://www.arlis.am/DocumentView.aspx?DocID=149957</p><p>[6] https://www.arlis.am/DocumentView.aspx?DocID=152169</p><p>[7] https://www.arlis.am/DocumentView.aspx?DocID=137681</p><p>&nbsp;</p><p>&nbsp;</p>"},{"id":"OP00270739","notice_type":"Request for Expression of Interest","noticedate":"30-Jan-2024","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2024-02-12T00:00:00Z","submission_deadline_time":"11:00","project_ctry_name":"India","project_id":"P168590","project_name":"Tamil Nadu Housing and Habitat Development Project","bid_reference_no":"IN-TNSCB-402241-CS-QCBS","bid_description":"Procurement of System Integrator (SI) for services to Design, Develop, Implement and Maintain Enterprise Resource Planning (ERP) System for TNUHDB","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Chennai, Tamil Nadu","contact_ctry_name":"India","contact_email":"tnuhdbprocurement@gmail.com","contact_name":"Superintending Engineer","contact_organization":"Tamil Nadu Urban Habitat Development Board","contact_phone_no":"+914428443375","submission_date":"2024-01-30T00:00:00Z","notice_text":"<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;REQUEST FOR EXPRESSIONS OF INTEREST&nbsp;</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p><strong>India</strong></p><p><strong>Tamil Nadu Housing and Habitat Development Project</strong></p><p>Loan No./Credit No./ Grant No.: 9094-IN</p><p>&nbsp;</p><p><strong>Assignment Title</strong><strong>: <strong>Procurement of System Integrator (SI) for Services to Design, Develop, Implement and Maintain e-Governance System for Tamil Nadu Urban Habitat Development Board</strong></strong></p><p>&nbsp;</p><p><strong>Reference No</strong><strong>:</strong><strong> </strong>IN-TNSCB-402241-CS-QCBS</p><p>Tamil Nadu Urban Habitat Development Board (TNUHDB) is implementing the Tamil Nadu Housing and Habitat Development Project financed by the World Bank and intends to apply part of the proceeds for consulting services.</p><p><em>Objective and Scope of Work:</em></p><p><em>TNUHDB intends to hire a Consulting firm (System Integrator) to design, develop, implement, operate, and maintain an Integrated Enterprise Resource Planning (ERP) and digital solution for TNUHDB to enhance the operations and transform the service delivery to its stakeholders while realizing the vision of &ldquo;a slum free city and upliftment of the urban poor and habitation&rdquo;. </em></p><p>The detailed scope of work of the consultancy services is indicated in TOR (Copy as attached)</p><p>Also the detailed Terms of Reference (TOR) for the assignment can be found at the following website:www.tnuhdb.tn.gov.in<u>.</u></p><p><strong>Duration of Assignment</strong></p><p>The duration of the assignment for building the ERP is (12 months + 2 months for stabilization) and a period of 36 months operation &amp; Maintenance from the date of commissioning of ERP.</p><p>The Tamil Nadu Urban Habitat Development Board, Government of Tamil Nadu now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their Expression of interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>The short-listing criteria are</strong><strong> in the Table below. </strong><strong>The lists of documents regarding the Eligibility Criteria of the firm to be submitted along with the Expressions of Interest are in the Table below:</strong></p><table border=\"1\" cellspacing=\"0\" style=\"width:472.25pt\"><thead><tr><td style=\"background-color:white; width:26.7pt\"><p><strong>S. No</strong></p></td><td style=\"background-color:white; width:211.55pt\"><p><strong>Eligibility Criteria</strong></p></td><td style=\"background-color:white; width:3.25in\"><p><strong>Supporting documents for fulfilling the Eligibility Criteria</strong></p></td></tr></thead><tbody><tr><td style=\"height:49.9pt; vertical-align:top; width:26.7pt\"><p>1</p><p>&nbsp;</p></td><td style=\"height:49.9pt; vertical-align:top; width:211.55pt\"><p>The Firm should be a company registered under the provisions of the Indian Companies Act, 1956/2013 or a partnership firm registered under the Indian Partnership Act1932 or the Limited Liability Partnerships Act, 2008.</p><p>(Applicable for Indian firms). For firms registered outside India, onus will be to demonstrate that the legal structure of the firm complies with internationally accepted good practices and the Indian provisions mentioned above.</p><p>&nbsp;</p><p>Firm should have GST registration. (Applicable for Indian firms)</p><p>&nbsp;</p><p>Firm should have been operational for the last 10 (Ten) years.</p><p>&nbsp;</p></td><td style=\"height:49.9pt; vertical-align:top; width:3.25in\"><p>Copy of Certificate of Incorporation or Copy of LLP firm registration certificate, as applicable.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>Copy of Goods and Services Tax (GST) certificate with GST registration number (GSTIN)</p><p>&nbsp;</p><p>&nbsp;</p><p>Copy of PAN Card(Applicable for Indian firms)</p><p>&nbsp;</p><p>In addition, for JV Partner bids</p><p>&bull; The Signed JV Partner Agreement clearly stating:</p><p>&minus; Roles and responsibilities of each member</p><p>&minus; The Lead Firm shall have maximum Stake in the JV Partner</p><p>&minus; The Lead Firm shall be responsible and jointly &amp; severally liable under this RFP Terms for:</p><p> The delivery of products &amp; services</p><p> Successful completion of this entire Project</p><p> Compliance with the SLAs</p><p>&bull; Authorization by authorized signatories of JV Partner members authorizing the Lead Firm to bid on their behalf for this RFP</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>2</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm (JV Partner) should be certified in all.</p><ul><li>CMMI Level 3 or above</li><li>ISO 9001:2008 or above &ndash; for Quality Process</li><li>ISO 20000:2011 or above for IT Service Management</li><li>ISO 27001:2005 or above for Information Security Management System</li></ul></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of the requisite certificates should be enclosed.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>3</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>Board resolution / Power of attorney in favour of authorised signatory</p><p>&nbsp;</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of Power of attorney with appropriate supporting documents</p><p>Power of attorney in favour of the lead member</p><p>In case of JV Partner, the members shall submit a power of attorney in favour of the lead member.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>4</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have a positive net worth in each of last three (3) financial years (FY 2020-2021, FY 2021-2022, FY 2022-2023)</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Certificate from the Statutory Auditor clearly stating the net worth</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>5</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have an average annual turnover of Rs.60Crore and above, in each of the last three (2020&mdash;21, 2021-22&amp; 2022-23) audited financial years.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Financial turnover Statement from CA along with Profit &amp; Loss statements</p><p>Certificate from the statutory auditor clearly stating the total turnover.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>6</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm shall have local office in Chennai.</p><p>&nbsp;</p><p>If Firm does not have a local office in Chennai, an Undertaking is required indicating willingness to open a local office in Chennai within 30 days of signing of the contract.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of the Proof/Rental Agreement &amp; GST be submitted along with office Pictures.</p><p>&nbsp;</p><p>Undertaking letter</p><p>&nbsp;</p><p>.</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>7</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have the project experience of development, implementation and maintenance of a workflow-based ERP/IT applications and portal implemented/ongoing in public or private sector in India over the last seven (7) years, indicating the works completed with their value and percentage of work completion along with the total contract value if on-going works. This excludes the cost of procurement, deployment, and maintenance of infrastructure.</p><p>&nbsp;</p><ul><li>At least one (1) such project of value more than INR 10 Crore</li><li>At least two (2) such projects each of value more than INR 5 Crore</li><li>At least five (5) such projects each of value more than INR 2 Crore</li></ul></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of work order and Completion certificate(s) from the client (Completed or Ongoing)</p><p>and</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)</p><p>&nbsp;</p><p><strong>Note:</strong><br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation</p></td></tr><tr><td style=\"height:60.25pt; vertical-align:top; width:26.7pt\"><p>8</p></td><td style=\"height:60.25pt; vertical-align:top; width:211.55pt\"><p>The Firm should not be under a declaration of in-eligibility for corrupt, fraudulent or any other unethical business practices and should not be debarred or blacklisted by World Bank.</p></td><td style=\"height:60.25pt; vertical-align:top; width:3.25in\"><p>Undertaking on company&#39;s letter head signed by company&rsquo;s authorized signatory</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>9</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have financial capability to handle the services by mobilizing Rs.25 lakhs per month in advance to disburse payment to the resources deployed for at least Two months (Rs. 50 Lakhs) without awaiting payment from TNUHDB.</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Any Scheduled Banker&rsquo;s certificate to this effect to be produced/ Declaration</p></td></tr><tr><td style=\"height:79.85pt; vertical-align:top; width:26.7pt\"><p>10</p></td><td style=\"height:79.85pt; vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in documents digitization of at least 50 lakh pages during the last seven (7) years.&nbsp;</p></td><td style=\"height:79.85pt; vertical-align:top; width:3.25in\"><p>Scope of Work Document along with the detailed agreement copy.</p><p>and&nbsp;</p><p>Certificate(s) from the client related to Document Digitalization (Completed or phase completed)</p><p>and</p><p>Certification by Statutory Auditor or independent auditor (Completed or phase completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation.&nbsp;</p></td></tr><tr><td style=\"height:93.1pt; vertical-align:top; width:26.7pt\"><p>11</p></td><td style=\"height:93.1pt; vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in IT projects establishing Data Centre or Disaster Recovery Centre with facility management services of comparable scope and magnitude during the last seven (7) years from the date of submission of bid.</p></td><td style=\"height:93.1pt; vertical-align:top; width:3.25in\"><p>Copy of work order&nbsp;</p><p>and&nbsp;</p><p>Completion certificate(s) from the client (Completed or phase completed)&nbsp;&nbsp;</p><p>and&nbsp;&nbsp;</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation.&nbsp;</p></td></tr><tr><td style=\"vertical-align:top; width:26.7pt\"><p>12</p></td><td style=\"vertical-align:top; width:211.55pt\"><p>The Firm should have the experience in IT projects (completed) including setting up Local Area Network (LAN) infrastructure during the last seven (7) years from the date of submission of bid</p></td><td style=\"vertical-align:top; width:3.25in\"><p>Copy of work order&nbsp;</p><p>and&nbsp;</p><p>Completion certificate(s) from the client (Completed)&nbsp;&nbsp;</p><p>and&nbsp;&nbsp;</p><p>Certification by Statutory Auditor or independent auditor (Completed with Value &amp; other relevant parameters)&nbsp;&nbsp;</p><p><strong>Note:-</strong>&nbsp;<br />Copy of work order or contract agreement or client certificate or auditor certificate /statements should clearly mention the scope, project value and other relevant particulars for evaluation</p></td></tr></tbody></table><p><strong>Note</strong>: Firms submitting documentation which are not in Indian rupees (contracts, work orders, certificates, etc.), in their EOIs, conversion of the local currency into Indian Rupees should be done to facilitate review of REOI using currency conversion rate of the date of advertisement of the REOI.</p><p>The Firm must provide the following additional details also:</p><ol><li>Name, address, e-mail, telephone along with a note on the ownership, organizational structure, and core business area of the consulting firm.</li><li>A short write-up on technical and managerial capability of the firm for undertaking the assignment but without submission of individual key experts&rsquo; bio data.</li></ol><p>&nbsp;</p><p><strong>Note: Key Experts will not be evaluated at the short-listing stage of EoI.</strong></p><p>Consultant firm may submit other documents considered important, which are not listed above, to justify general qualifications and qualifications relevant to the assignment.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s prevailing &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016,(&ldquo;Procurement Regulations&rdquo;) as amended 20 November 2020, &nbsp;setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a JV Partner and/or a sub-consultancy. In the case of a JV Partner, all the partners in the JV Partner shall be jointly and severally liable for the entire contract, if selected.</p><p>As per the Government of Tamil Nadu directions, all procurement activities should be processed through Government e-Procurement portal www.tntenders.gov.in.</p><p>The preferred Consulting firm will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations of World Bank.</p><p>Further information can be obtained at the address below during office hours i.e.10:00 AM to 5:45 PM. (Except holidays)</p><p>Expressions of interest must be delivered through e procurement portal on or before <strong>12.02.2024 </strong>up to <strong>11.00</strong><strong> </strong><strong>AM Indian Standard Time</strong>.</p><p><strong><u>Attention</u></strong>:</p><p>Superintending Engineer,</p><p>Project Monitoring Unit - World Bank Project</p><p>Tamil Nadu Urban Habitat Development Board,</p><p>No.5, Kamarajar Salai,</p><p>Chennai &ndash; 600 005,&nbsp;</p><p>Tamil Nadu, India,</p><p>E-mail: <u>tnuhdbprocurement@gmail.com</u></p><p>&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; TERMS OF REFERENCE&nbsp;</strong></p><p><strong>Terms of Reference&nbsp;for Selection of System Integrator (SI) for Implementation of Enterprise Resource Planning (ERP) and Digital Platform for TNUHDB</strong></p><p><strong>January 2024 </strong></p><p>&nbsp;</p><p><strong>Table of Contents</strong></p><p>Background. 5</p><p>Objective. 5</p><p>Overview of Scope of Work for System Integrator 5</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Firm Capability. 10</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Team Compositions. 11</p><p>2.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Implementation team composition. 11</p><p>2.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operation &amp; maintenance (Data Centre) support team.. 17</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Capacity-building program.. 23</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project deliverables / Timeline / Payment schedule. 24</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance to Standards. 25</p><p>5.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Adherence to Open-Source Standard. 25</p><p>5.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance with Government standards &amp; policies. 25</p><p>5.3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance with Industry Standards. 25</p><p>5.4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Single-Sign On. 26</p><p>5.5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Support for PKI based Authentication and Authorization. 26</p><p>5.6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interoperability Standards. 26</p><p>5.7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scalability. 26</p><p>5.8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Security. 26</p><p>5.9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Application Architecture. 29</p><p>5.10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Proposed Application Architecture. 30</p><p>5.11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; High Level Design (HLD) 30</p><p>5.12.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Detailed (Low Level) Design (LLD) 30</p><p>5.13.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Test Plan. 30</p><p>5.14.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Specification. 30</p><p>5.15.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Non-Functional Requirements. 31</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data, local services, personnel, and facilities to be provided by the Borrower 34</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operation and maintenance. 35</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Institutional and organization arrangements. 35</p><p>8.1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Stakeholders. 35</p><p>8.2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Governance Structure. 35</p><p>8.3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communication Protocols 36</p><p>8.4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Progress Reports/ Reports/Notes. 36</p><p>8.5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Communication medium.. 37</p><p>8.6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Submission of Work Outputs. 37</p><p>8.7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Quality Assurance Plan. 37</p><p>8.8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Change management and risk management 37</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Commencement Date. 37</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Period of Contract 37</p><p>11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting arrangement 38</p><p>Annexure I&nbsp; - Solution / Implementation Approach. 39</p><p>Annexure II- Track 1: Application design, development, and implementation. 40</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Scope of Application Development 40</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Administration - User Management, Workflow management, Audit-Trail 50</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mobile application. 51</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design, Develop and Implement the TNUHDB Information Portal 53</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design and Development of Mobile Application. 54</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; System Architecture. 55</p><p>7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Internet and Intranet Enabled. 57</p><p>8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Graphical User Interface. 57</p><p>9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Workflow Integration Approach. 58</p><p>10.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Installation/ Upgrade/ Enhancement 59</p><p>11.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <em>Scalability</em>. 59</p><p>12.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Security. 60</p><p>13.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; System Control and Audit 63</p><p>14.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data Backup/ Data Archival/ Restore. 64</p><p>15.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Database. 64</p><p>16.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Enterprise Monitoring System (EMS) 65</p><p>17.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operations. 73</p><p>18.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stages of Application Development 74</p><p>Annexure III - Track 2: Data digitalization. 79</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Documents scanning and digitalization requirements. 79</p><p>Annexure IV - Track 3: IT Infrastructure procurement, supply, Installation, and bandwidth for the project 83</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT Infrastructure Requirements. 83</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT infrastructure deployment plan. 85</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cloud Hosting. 86</p><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Local Area Network. 89</p><p>5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Network Operation Centre (NOC) 90</p><p>6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Internet Infrastructure and Connectivity. 92</p><p>Annexure V - Track 4: Training and Capacity Building. 95</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Introduction. 95</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Training requirements. 96</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Training Effectiveness. 98</p><p>Annexure VI- Track 5: Operations and Maintenance. 99</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Applications Support and Maintenance. 99</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; IT Infrastructure Support and Maintenance. 101</p><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Compliance to SLA. 109</p><p>Annexure VII - Governance Structure and Responsibility. 111</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Leadership Team.. 111</p><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project Implementation Committee (PIC) 111</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><br />&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Background</strong></p><p>Tamil Nadu Urban Habitat Development Board (TNUHDB) is implementing the Tamil Nadu Housing and Habitat Development Project (TNHHP) financed by the World Bank. TNUHDB intends to engage System Integrator (SIs) for Design, Develop, Implement an ERP and digital platform for TNUHDB board and service delivery to citizens and for Operations and maintenance of solutions.</p><p>Primary objective of TNUHDB is to provide housing for urban poor. TNUHDB services are in green field development, in-situ upgradation, and reconstruction. Housing schemes provided by TNUHDB are &ldquo;In-Situ&rdquo; Slum Redevelopment (ISSR), Affordable Housing in Partnership (AHP), Subsidy for Beneficiary &ndash; Led individual house construction (BLC), Promotion of Affordable Housing for weaker sections through Credit Linked Subsidy Scheme (CLSS). Under Housing for All (HFA - Urban), TNUHDB is designated as the implementing agency for AHP and BLC schemes.</p><p>Functions of TNUHDB are carried out by functional divisions namely, Technical, Administration and Establishment, Finance and Accounting. The technical division is headed by Chief Engineers (CE) and is assisted by Superintending Engineers (SE). The Secretary manages the administration and establishment division while the Financial Advisor is responsible for the finance and accounting division. The Project Management Unit (PMU) headed by the Joint Managing Director/Project Director, handles the Externally aided Project Financed by MDBs such as the World Bank (WB) and Asian Development Bank (ADB). The TNUHDB functions are distributed to the wings, and each wing is supported by sectional units and staff. TNUHDB has its Board office at Chennai and is supported by two (2) Regional Offices, four (4) Circle Offices in Chennai and one (1) Circle Office each in Madurai and Coimbatore and 21 Divisional Offices across the State.</p><p><strong>Objective</strong></p><p>TNUHDB intends to hire an agency (System Integrator) to design, develop, implement, operate, and maintain an Integrated Enterprise Planning (ERP) and digital solution for TNUHDB to enhance the operations and transform the service delivery to its stakeholders while realizing the vision of&rdquo; a slum free city and upliftment of the urban poor and habitation&rdquo;.</p><p>&nbsp;</p><p><strong>Overview of Scope of Work for System Integrator</strong></p><p>The scope of work envisaged for the System Integrator comprises of following key activities.</p><ol><li>Application Design, Development, and Implementation</li><li>Cloud Hosting, IT &amp; Network infrastructure and End user computing</li><li>Data digitization</li><li>Experience Centre and citizen kiosks setup</li><li>Help desk setup and operations</li><li>Training and capacity building</li><li>Operation and maintenance</li></ol><p>The key activities are detailed below:</p><ol><li><strong>Application Design, Development, and Implementation</strong></li></ol><ul><li>The scope of work will comprise development of following components:<ul><li><strong>Integrated Project Management System (PMS)</strong> for technical wing to carry out the functions of Land identification, finalization, alienation, DPR preparation, planning, works procurement, contract management and monitoring, Allotment and maintenance of tenemental schemes</li><li><strong>Enterprise Resource Planning (ERP)</strong> System with Estate management, office administration, Accounting and Finance and Human resource management.</li><li><strong>Employee Portal</strong> with Task dashboard, Knowledge Management System (KMS), Learning Management System (LMS), Management Information System</li><li><strong>Citizen portal</strong> with online citizen / beneficiary services, Grievance Redressal Management, Community Development Information System, Housing need assessment survey, Documentary Repository</li><li><strong>Enterprise Support Applications</strong> with Document Management System, Content management system, GIS mapping, Business intelligence and analytics platform &amp; MIS Dashboard, Help desk support</li></ul></li><li>Procurement and deployment of application specific support tools and software for 2D and 3D planning, designing, modelling, Structural designing and analysis of building systems, Estimation of quantities and cost analysis</li><li>Bring in the functional requirements of the ERP and digital platform of TNUHDB in the solution offering and serve the broad functions of technical wing covering workflow management, project monitoring and control, task scheduling, resource and material management, collaboration, tracking, dashboard and reporting</li><li>Designing of Integrated solution architecture for application design and development</li><li>Applications developed must support access to TNUHDB users across different locations via LAN, WAN and internet with secured connectivity and support all related protocols</li><li>Graphical user interface (GUI) must be user friendly, interactive, and efficient and have responsive design, support document uploading, indexing, referencing of scanned and digitized files in the application system and data repositories</li><li>System design must provide for seamless integration of current and new applications within its architecture with minimal impact and changes. Be fully integrated across modules and functional areas Identify the data/ services which is to be exchanged between the application and other internal/ external systems.</li><li>Apart from cross platform integration, system must be integrated with other services such as Digital signature, E-office, E-procurement &amp; gateway services such as SMS and email.</li><li>In longer run system must address the integration requirement with various government departments such as Housing department, RERA, DTCP, Collectorate, GCC and CMWSSB etc. for exchange of information on housing projects and other functions.</li></ul><p><strong>Application development phases:</strong></p><ul><li><strong>Design Phase</strong> &ndash; Requirement gathering, Preparation of Software Requirement Specification (SRS), High Level Design (HLD) and Low-Level Design (LLD)</li><li><strong>Development and Testing phase</strong> &ndash; Development of modules, Testing of modules, User Acceptance Test (UAT) and Go-Live of applications</li><li><strong>Operation and Maintenance (O&amp;M) phase</strong> &ndash; O&amp;M of applications for all users, Resolution of errors and bugs, change management</li></ul><p>&nbsp;</p><ol><li><strong>Cloud Hosting, IT, Network infrastructure and End user computing</strong></li></ol><ul><li><strong>Cloud Hosting:</strong><ul><li>Hosting of All Applications, Digitized Data and Users Data on Cloud Environment</li><li>Managed Storage, Network Services As required</li><li>Containerization and Orchestration Services for Container Based Deployment</li><li>High Availability &amp; Disaster Recovery Site with Hot Standby</li><li>Provisioning of required bandwidth for seamless data flow between DC and Disaster recovery site</li><li>Implement Data backup and replication policies</li><li>Coordination with Cloud service provider for provisioning required compute, storage &amp; network services for running the application efficiently</li><li>Provision for all Environments (development, test, staging and production) on DC and Cloud DR.</li><li>Supply, deploy &amp; configure Enterprise Monitoring Support (EMS) tools to TNUHDB for remotely Monitoring all resources during implementation and operation &amp; maintenance period and support the proposed hardware and software components at Cloud DC and DR. It must support configuration Management, Fault and incident Management, Asset management</li></ul></li></ul><p>&nbsp;</p><ul><li><strong>Networking:</strong><ul><li>Revamping of LAN with Fiber backbone.</li><li>1 GBPS Throughput of Network for Board office</li><li>Head office to Estate and regional office connectivity over VPN</li><li>Wireless Connectivity to Users across all the offices</li></ul></li><li><strong>Security and Monitoring:</strong><ul><li>Firewalls &amp; Intrusion prevention system for Securing the network, Internal Segmentation Based on Type of Users</li><li><strong>Antivirus for end users</strong> and Enterprise Monitoring System for monitoring network, server &amp; applications resources</li><li>Creating Active Directory/Domain Controller, DHCP, Contact Centre Hosting at Central Location</li></ul></li><li><strong>End user Infrastructure:</strong><ul><li>Provisioning needs-based end use compute with basic software suites such as Microsoft Office,</li><li>Special compute requitement for Engineering Division to access the 3D Drawings and editing tools</li><li>Multifunction Devices to each Wing or Division</li><li>Plotter and Large Printer at Head office as a central resource</li></ul></li><li><strong>Software Tools:</strong><ul><li>Software tools for Structural analysis, BIM, 2D &amp; 3D CAD</li><li>Helpdesk and Contact Centre Set up Voice and Non voice Support like Chatbot, Email and Physical Submission</li><li>SMS &amp; Email Services for Users, Citizen Kiosk for Citizens at Offices.</li></ul></li></ul><p>&nbsp;</p><ol><li><strong>Data Digitization:</strong></li></ol><ul><li>There are approximately 50 Lakh physical records to be digitized. Documents to be digitized include allotment orders, sale deeds, Land documents, scheme proposals and documents, applications forms, survey drawings, sketches, Layout plans, structural drawings, test reports, planning permissions, NoC&rsquo;s, clearances obtained, Government orders, enumeration and survey reports.</li><li>Confidential documents of TNUHDB shall be scanned and digitalized at TNUHDB&rsquo;s premise. TNUHDB shall provide the space for the same.</li><li>Non-confidential documents of TNUHDB can be scanned and digitalized at SI&rsquo;s premise.</li><li>To undertake steps of digitization &ndash;<ul><li><strong>Initiation</strong>: Deployment of IT infrastructure &ndash; Scanners, cameras, printers, secure access devices, Deployment of manpower for digitization</li><li><strong>Pre-scanning</strong>: Collection of documents (files, papers, books), pre-processing of documents, classification of records</li><li><strong>Data entry</strong>: Generation of checklist, MIS data entry, Document status entry</li><li><strong>Document scanning:</strong> Scanning of documents, required image correction</li><li><strong>Post &ndash; scanning:</strong> Handover binding of books / files, Bar code generation and pasting, Quality check of scanned documents, Image enhancement, TPA quality, archival of electronic documents and backup</li><li><strong>Indexing:</strong> Meta data entry, Indexing based on defined parameters, Handing over print-out of indexing files for Quality check</li><li><strong>Storage upload:</strong> Upload of scanned documents and index files into the storage device in storage devices in DC/DR. Integration of scanned DB and index files with ERP and digital applications.</li><li><strong>Training:</strong> Training to TNUHDB users and staff</li></ul></li></ul><p>&nbsp;</p><ol><li><strong>Experience center and Citizen Kiosk setup</strong></li></ol><ul><li><strong>Experience center:</strong> TNUHDB intends to build an Experience Centre within Board office building for providing digital experience to various stakeholders and Citizens visiting the office. This experience centre shall elevate the digital experience of Citizens through various audio-visual content about TNUHDB and their housing schemes, completed and ongoing projects, take feedback from beneficiaries of housing schemes</li><li>To fit, establish Experience Centre with IT hardware such as video wall, projector, projector screen, sound system, tablets, printers, fire security systems and non-IT infrastructure such as civil work, interiors, furnishing. Detailed requirements of IT and Non-IT components of Experience Center are provided in the RFP.&nbsp;&nbsp;</li><li><strong>Citizen Kiosks:</strong> TNUHDB intends to set up Citizen Service Kiosk at various Citizen Interface Points. These Citizen Kiosk would be offering various Services through interactive user interface such as application tracking, complaint or grievance registration, tracking of grievances or complaints, Information on various schemes, eligibility checking and allotment list of housing schemes. Also, services like online payment collection, online receipt generation can be offered through such Kiosks.</li><li>To consult with TNUHDB officials and design an interactive user interface for Citizen Kiosk which shall offer the listed services</li><li>SI shall procure the required hardware and house the entire system in an enclosure for outdoor deployment such as Estate offices, Citizen Service Centers, designated Scheme tenemental areas. If required Canopies can be considered</li></ul><p>&nbsp;</p><ol><li><strong>Help desk setup and operations</strong></li></ol><ul><li>Helpdesk Support for various Citizen / Beneficiary Services offered by TNUHDB information Portal, Support to Citizens seeking Information about schemes and projects undergoing.</li><li>Support both Voice and Non-Voice Support system as per convenience of Citizen. Voice operations must have trained agents and ticketing tool to register and generate ticket ID.&nbsp; Non voice support must be able to collect grievance and complaints from web portal chat bot, Email through mobile application and physical submissions.</li><li>For voice support required components such as IP Exchange, contact centre application, Voice logger and gateways etc. must be considered&nbsp;</li><li>It must have helpdesk application linked with TNUHDB Portal and Mobile application to log issues online through web and mobile</li><li>Helpdesk support in multilingual &ndash; Tamil, English and have Interactive Voice Response (IVR) system for first level of call segregation</li><li>In addition to the telephone call, the SI shall also provide other two-way integrated communication channels for call logging, like portal, chat app, email, and SMS for speedy query resolution and to manage all the communications across channels in one place no matter how users contacted the helpdesk.</li><li>MIS entry of All grievances &amp; interlink with individual performance of employees</li><li>SI should Impart trainings (on applications, IT Infrastructure, soft skills, call handling procedures and others) to Customer Service Executive and Supervisors with documentations &ndash; Help manuals, training manuals, video tutorials</li><li>Reports &ndash; Incident logs, Incidents escalated, SLA compliance/non-compliance, calls per week, month, or another period, calls for each interaction tracked by type, number of dropped calls after answering and others</li><li>Development of training material for CSEs and supervisors</li><li>Provision of Call Center application including CRM on services model</li><li>Development of standard operating procedures with call prioritization guidelines, problem security codes and escalation procedures etc. in consultation with TNUHDB</li></ul><p>&nbsp;</p><ol><li><strong>Training and Capacity Building</strong></li></ol><ul><li>Provide training to stakeholders, on the usage and maintenance of TNUHDB applications like PMS, ERP, Employee and Citizen portal &amp; mobile application, Solution System, DC, Cloud DR, LAN, FTTP Network, Helpdesk and Experience Centre.</li><li>Design a calendar of training activities, for various solution components of the TNUHDB project</li><li>The calendar designed shall identify the type of training (comprehensive competency-based training), topics to be covered and the details on trainee, trainer, and the venue</li><li>System integrator to arrange training with required infrastructure along with providing the training plan, training content &amp; the training delivery and bear the cost for the same.</li><li>Types of Training: Administrative and Project related, Functional, Technical (Application and Infrastructure)</li></ul><p>&nbsp;</p><ol><li><strong>Operation &amp; Maintenance:</strong></li></ol><ul><li>Operate and maintain all the components of this project after Go-Live date for the period. During O&amp;M phase, SI to ensure that service levels are monitored on continuous basis; service levels are met and are reported to TNUHDB</li><li><strong>Application Support and Maintenance</strong> &ndash; Compliance to SLA, Annual Technology support, Application Software Maintenance, Change and version control, Impact analysis, maintenance of configuration information, Training, maintain system documentation</li><li><strong>IT Infrastructure support and maintenance &ndash; </strong>warranty support for deployed IT infrastructure, Maintenance of IT infrastructure, management of servers, network infrastructure, experience centre, Kiosk. System administration and network monitoring, security management</li></ul><p>&nbsp;</p><p>The key components of the scope of work are further detailed in Annexure I</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Firm Capability</strong></li></ol><p>System Integrators (Firm) is required to have experience, expertise and technical capability to carryout activities successfully.</p><ul><li>The Firm must be registered in India and shall be in similar field during the last 10 years.</li><li>Firm must have prior experience of engagement in implementation of project with any Central Government / State Government or any Public Sector undertaking, within India on ERP, e -Governance, Software development projects of at least one (1) such project of value more than INR 10 Crore, two (2) such projects each of value more than INR 5 Crore and at least five (5) such projects each of value more than INR 2 Crore during the last 7 years</li><li>Have experience of large successful ERP and software Go-Live / completed project.</li><li>Have Professionally qualified full-time employees in ERP system development and maintenance.</li><li>Have local office presence in Chennai. If the Bidder is not having an Office in Chennai, a necessary undertaking letter to open the Office in Chennai within 30 days of signing the agreement should be submitted.</li><li>Have Certifications: CMMI, ISO 9001:2008, ISO 20000:2011, ISO 27001:2005</li></ul><p>Have experience in solution design, development and maintains services for:</p><ul><li>Enterprise Resource Planning (ERP) covering Administration, Establishment, Human resources, Accounting and Finance functions.</li><li>Project Management System with engineering and planning, contract management, works monitoring functions.</li><li>Citizen portal and online service delivery</li><li>Workflow based application.</li><li>ERP Integration with external application</li><li>Mobile application for operation functions, monitoring and service delivery</li><li>Data Centre Infrastructure Support and Maintenance Services</li><li>Cloud hosting and managed services</li><li>IT hardware and Network infrastructure design, deployment, maintenance services</li><li>IT Application Support and application Maintenance Services&nbsp;&nbsp;</li><li>Payment gateway integration or any other third-party integration services</li><li>Application performance monitoring / management</li><li>GIS mapping, user and asset management services</li><li>Data digitization, data migration services</li><li>Helpdesk and support services</li></ul><p>&nbsp;</p><ol><li><strong>Team Compositions </strong><ol><li>Implementation team composition</li></ol></li></ol><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:683.75pt\"><thead><tr><td style=\"height:14.35pt; vertical-align:top; width:106.8pt\"><p><strong>Position </strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:234.95pt\"><p><strong>Qualification / Experience</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:225.0pt\"><p><strong>Rolls &amp; Responsibilities</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:67.5pt\"><p><strong>Person Months</strong></p></td><td style=\"height:14.35pt; vertical-align:top; width:49.5pt\"><p><strong>Home/ Field</strong></p></td></tr></thead><tbody><tr><td style=\"height:96.0pt; vertical-align:top; width:106.8pt\"><p><strong>Program Manager / Team Leader</strong></p></td><td style=\"height:96.0pt; vertical-align:top; width:234.95pt\"><ol><li>Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent<br />c) Experience: Should possess at least 12 years of experience in IT domain.<br />d) Project Experience: i. Should have at least 3 projects of similar scope as Program manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or autonomous bodies or public sector undertakings or other government organization<br />&nbsp;</li></ol></td><td style=\"height:96.0pt; vertical-align:top; width:225.0pt\"><ul><li>Team Leader is responsible for setting&nbsp;clear goals and objectives to ensure the team&#39;s success.</li><li>Define objectives and&nbsp;key results&nbsp;aligned with the team&#39;s overall goals.</li><li>Responsible for monitoring their teams&#39; progress throughout the entire project and resolving any issues that arise during the project.</li><li>Responsible for ensuring open communication among team members.</li><li>Responsible for leading regular&nbsp;team meetings&nbsp;to ensure that all team members have an open line of communication and can stay up-to-date on their progress</li></ul></td><td style=\"height:96.0pt; vertical-align:top; width:67.5pt\"><p>12</p></td><td style=\"height:96.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:71.5pt; vertical-align:top; width:106.8pt\"><p><strong>Project Manager, Software</strong></p></td><td style=\"height:71.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent<br />c) Experience: Should possess at least 10 years of experience in IT domain including Software development and implementation<br />d) Project Experience: i. Should have at least 3 projects of similar scope as Project manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization. iii. Should have managed a team of 30+ software developers iv. Should have experience in prevalent project methodologies e.g., Agile<br />&nbsp;</p></td><td style=\"height:71.5pt; vertical-align:top; width:225.0pt\"><ul><li>Identify infrastructure goals and project delivery clearly.</li><li>Planning out the blueprints for software projects, including defining the scope, allocating resources, setting deadlines, laying out communication strategies, and indicating tests and maintenance.</li><li>Identify prime risks and limitations within project plan.</li><li>Participating in and supervising each stage of the project.</li><li>Ensuring project stays on schedule and adheres to the deadlines.</li><li>Determining and overseeing consistent testing, evaluation, and troubleshooting of all products in all stages of completion</li><li>Tracking milestones, deliverables, and change requests.</li><li>Delivering completed software products to clients and performing regular checks on the products&#39; performance.</li></ul><p>&nbsp;</p></td><td style=\"height:71.5pt; vertical-align:top; width:67.5pt\"><p>9</p></td><td style=\"height:71.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:22.0pt; vertical-align:top; width:106.8pt\"><p><strong>Project Manager, Infrastructure &amp; Network </strong></p></td><td style=\"height:22.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology from a reputed University or College or Institute<br />b) Certification: OEM or Industry Standard certification in Infrastructure Management. E.g., ITIL V.3, ISO 20000, and others<br />c) Experience: Should possess at least 10 years of experience in IT infrastructure domain<br />d) Project experience: i. Should have at least 3 projects of similar scope as Project manager ii. Should have at least 2 projects executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization iii. Should have managed a team of 20+ resources iv. Experience in setting up an IT ecosystem from scratch would be an added advantage.</p><p><br />&nbsp;</p></td><td style=\"height:22.0pt; vertical-align:top; width:225.0pt\"><ul><li>Assessing the requirements of the project and recommending suitable IT components</li><li>Analyzing different options and recommending the most suitable for the project economically feasible</li><li>Work on improving the IT infrastructure.</li><li>Recommend upgrades and new systems that will be more useful for the project</li><li>Formulating procedures and policies for optimum utilization of IT infrastructure resources</li><li>&nbsp;Supervising IT staff, consultants, vendors and suppliers</li><li>&nbsp;Meeting with managers of different departments and assessing IT infrastructure needs.</li><li>Meeting with IT analysts and finalizing essential IT infrastructure</li><li>&nbsp;Planning and supervising installation of IT infrastructure</li><li>Making sure that the infrastructure development project is completed within the given time frame</li></ul></td><td style=\"height:22.0pt; vertical-align:top; width:67.5pt\"><p>9</p></td><td style=\"height:22.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:108.5pt; vertical-align:top; width:106.8pt\"><p><strong>Solution Architect</strong></p></td><td style=\"height:108.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or&nbsp; B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Industry standard certifications like TOGAF, Scrum Master, CISSP (Architecture) and others<br />c) Experience: Should possess at least 8 years of experience in IT domain for at least 5 years of experience as Solution Architect<br />d) Project experience: Should have at least 2 projects of similar scope as Solution Architect in large projects</p></td><td style=\"height:108.5pt; vertical-align:top; width:225.0pt\"><ul><li>Designing, modifying, and testing technical architecture</li><li>Provide supervision and guidance to development teams<br />Continually research the current and emerging technologies and propose changes where needed.</li><li>Inform various stakeholders about any issues with the current technical solutions being implemented.</li><li>Assess the business impact that certain technical choices have.</li><li>Provide updates to stakeholders on product development processes, costs, and budgets</li></ul><p>&nbsp;</p></td><td style=\"height:108.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:108.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:40.0pt; vertical-align:top; width:106.8pt\"><p><strong>Database Expert </strong></p></td><td style=\"height:40.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology from a reputed University or College or Institute<br />b) Certifications: Certified DBA<br />c) Experience: Should possess at least 8 years of experience in IT domain for at least 5 years in Database architecting or design in large scale projects of similar nature<br />d) Project experience: i. Should have at least 2 projects of similar scope as Database architect ii. Should have experience in database activities like instance tuning, schema management, space management, backup and recovery, disaster recovery, data replication, database refresh and others. iii. Have experience in open-source databases.</p><p>&nbsp;</p></td><td style=\"height:40.0pt; vertical-align:top; width:225.0pt\"><ul><li>Designs database systems and management tools.</li><li>Installs, updates, and maintains computer databases.</li><li>Assesses database performance by developing protocols to measure results and identify problem areas.</li><li>Supports database performance by monitoring, evaluating, and resolving processing and programming problems.</li><li>Secures database by preparing access and control policies and procedures and implementing disaster recovery procedures.</li><li>Supports application design by contributing expertise to operations and technical support teams.</li><li>Provides technical support to employees.</li></ul></td><td style=\"height:40.0pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:40.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:22.0pt; vertical-align:top; width:106.8pt\"><p><strong>Operations Manager</strong></p></td><td style=\"height:22.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;with preferably MBA degree from a reputed University or College or Institute<br />b) Certifications: ITIL v3<br />c) Experience: Should possess at least 10 years of experience for at least 5 years in maintenance and operations of large IT setups<br />d) Project experience:<br />i. Should have at least 3 projects of similar scope as Operation manager<br />ii. Should have at least 1 project executed in e-governance with government or semi-government or government autonomous bodies or public sector undertakings or other government organization<br />iii. Should have managed a team of at least 20 members<br />iv. Should have a knowledge of ISO 20000, 27001 standards and other relevant standards<br />&nbsp;</p></td><td style=\"height:22.0pt; vertical-align:top; width:225.0pt\"><ul><li>Overseeing the daily operations of the IT department and ensuring that systems and networks are running smoothly.<br />&zwj;Developing and implementing policies, procedures, and processes to</li><li>improve IT operations and increase efficiency and productivity.<br />&zwj;Managing technology vendors and service providers to ensure that the organization&#39;s technology needs are met.</li><li>Evaluating and implementing new technologies and systems that improve IT infrastructure and support the organization&#39;s business goals.</li><li>Lead the team and provide guidance and support to ensure that they are meeting their goals and objectives.</li><li>&zwj;Maintaining a strong understanding of the organization&#39;s business needs and working closely with other departments to ensure that IT is aligned with those needs.</li><li>Ensuring that the organization&#39;s IT policies and procedures are up to date and compliant with industry standards and company regulations.<br />&zwj;Managing the IT budget and ensuring that expenses are in line with the organization&#39;s financial goals</li><li>Keeping up to date with the latest industry trends and developments in IT operations management.</li><li>Assess system performance and recommend improvements</li><li>Provide support and guidance to stakeholders via help desk</li><li>&nbsp;</li></ul></td><td style=\"height:22.0pt; vertical-align:top; width:67.5pt\"><p>3</p></td><td style=\"height:22.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:120.0pt; vertical-align:top; width:106.8pt\"><p><strong>Business Analyst </strong></p></td><td style=\"height:120.0pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;with preferably MBA degree from a reputed University or College or Institute<br />b) Certifications: Certified Business Analyst<br />c) Experience: Should possess at least 8 years of experience in IT and ICT project implementation in Governance domain<br />d) Project experience: i. Should have at least 2 projects of similar scope as Business Analyst ii. Should have experience of more than 5 years in requirements analysis, business process workflow preparations, domain use case creation and other relevant activities iii. Experienced in designing data warehouses or marts as required<br />&nbsp;</p></td><td style=\"height:120.0pt; vertical-align:top; width:225.0pt\"><ul><li>Initiate the Software Project, brings together the stakeholders, collects all the information, and prepares a Scope Document,</li><li>Focus on high-level details and having the ability to understand precise outcomes as a part of business analyst requirements.</li><li>Understand requirement specifications, process flows, and creating business use case scenarios.</li><li>Represent Project Stakeholders throughout the process definition, functional and business requirements, and service priorities</li><li>Bridge the gap between business requirements and technology solutions and communicate effectively with stakeholders</li></ul></td><td style=\"height:120.0pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:120.0pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:96.5pt; vertical-align:top; width:106.8pt\"><p><strong>Security Architect </strong></p></td><td style=\"height:96.5pt; vertical-align:top; width:234.95pt\"><p>a) Education: Full time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Should have OEM/Industry Standard certification like CISM, CISSP, ISO 27001, and others as applicable<br />c) Experience: Should possess at least 8 years of experience in IT and ICT project implementation in Governance domain including designing and maintaining security systems<br />d) Project experience: i. Should have at least 2 projects of similar scope as Security Architect</p></td><td style=\"height:96.5pt; vertical-align:top; width:225.0pt\"><ul><li>Planning, studying and then designing a resistant security architecture for various IT projects.</li><li>Developing prerequisites for networks, firewalls, routers, and other network devices</li><li>Performing vulnerability assessment, security testing, and risk analysis</li><li>Researching and implementing the updated security standards, systems, and best practices</li></ul></td><td style=\"height:96.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:96.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr><tr><td style=\"height:96.5pt; vertical-align:top; width:106.8pt\"><p><strong>Test Lead</strong></p></td><td style=\"height:96.5pt; vertical-align:top; width:234.95pt\"><p>Have BE / B Tech in computer science/IT (or)</p><p>BCA / B.Sc. Computer Science (or)</p><p>Master&rsquo;s degree in computer science / Computer Application.</p><p>Minimum 5 years of work experience in Testing</p><p>Must have experience in online &amp; offline testing tools, load testing, regression testing &amp; other prominent black &amp; white box testing techniques.</p><p>&nbsp;</p></td><td style=\"height:96.5pt; width:225.0pt\"><ul><li>Meeting with development managers to discuss software specifications and controls.</li><li>Identify the scope of the testing required for a particular release based on the requirements of the document.</li><li>Put out the Test Plan after discussions with the test team and have it reviewed and approved by the Management/ Development team.</li><li>Identify the testing effort required by calculating the sizing needed for the given release and plan the required effort for the same.</li><li>Monitor the test progress by constantly assessing the work assigned to each of the resources and re-balance or re-allocate them as required.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li><li>Bridge any gaps and differences between the Testing team and the Management in order to form a clean two-way interface channel.</li><li>Building, coding, and implementing software evaluation test programs.<br />Running test programs to ensure that testing protocols evaluate the software correctly.</li><li>Finalizing and documenting testing procedures.</li><li>Completing final tests and creating test reports.<br />Presenting test reports to management and suggesting software fixes.</li></ul></td><td style=\"height:96.5pt; vertical-align:top; width:67.5pt\"><p>6</p></td><td style=\"height:96.5pt; vertical-align:top; width:49.5pt\"><p>Home/Field</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Operation &amp; maintenance (Data Centre) support team</li></ol></li></ol><table border=\"1\" cellspacing=\"0\" style=\"width:683.75pt\"><thead><tr><td style=\"height:17.5pt; vertical-align:top; width:107.75pt\"><p><strong>Position </strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:221.55pt\"><p><strong>Qualification / Experience</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:204.15pt\"><p><strong>Rolls &amp; Responsibilities</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:64.85pt\"><p><strong>Person Months</strong></p></td><td style=\"height:17.5pt; vertical-align:top; width:85.45pt\"><p><strong>Home/Field </strong></p></td></tr></thead><tbody><tr><td style=\"height:105.25pt; vertical-align:top; width:107.75pt\"><p><strong>Data Centre Manager</strong></p></td><td style=\"height:105.25pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certification: PMP or Prince2 or equivalent or OEM or Industry Standard certification in Infrastructure Management. E.g., ITIL V.3, ISO 20000, and others<br />c) Experience: Should possess at least above 10 years of experience in managing Data Centers<br />d) Project Experience: i. Should have led a team of more than 50 direct/indirect people</p></td><td style=\"height:105.25pt; vertical-align:top; width:204.15pt\"><ul><li>Maintain data centers and environmental facilities including power backup, fire prevention systems, and HVAC</li><li>Planning, installation, and support of the company&rsquo;s physical computer infrastructure (hardware, systems software, networks, and backup systems)</li><li>Troubleshoot issues within the data center and physical infrastructure<br />Manage and support change and release processes for physical environments</li><li>Provide cost and design proposals and liaise with vendors<br />Establish physical operational support procedures for all systems</li><li>Lead the team of employees and contractors, service providers</li><li>Train all team members</li><li>Create metrics and monitoring to aid in SLA reporting</li></ul><p>&nbsp;</p></td><td style=\"height:105.25pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:105.25pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:58.0pt; vertical-align:top; width:107.75pt\"><p><strong>System Administrator</strong></p></td><td style=\"height:58.0pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certification: CCNA / CCNP /MCSE / Linux or any other equivalent<br />c) Experience: Should possess at least 6 to 8 years of experience in system administration domain</p></td><td style=\"height:58.0pt; vertical-align:top; width:204.15pt\"><ul><li>Install and configure software and hardware</li><li>Manage network servers and technology tools</li><li>Set up accounts and workstations</li><li>Monitor performance and maintain systems according to requirements</li><li>Troubleshoot issues and outages</li><li>Ensure security through access controls, backups and firewalls</li><li>Upgrade systems with new releases and models</li><li>Develop expertise to train staff on new technologies</li><li>Build an internal wiki with technical documentation, manuals and IT policies</li></ul><p>&nbsp;</p></td><td style=\"height:58.0pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:58.0pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:94.45pt; vertical-align:top; width:107.75pt\"><p><strong>Database Administrator</strong></p></td><td style=\"height:94.45pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute Certification: OCA/OCP/Java/MySQL or equivalent<br />b) Experience: Should possess at least 6 to 8 years of experience in handling databases / Network databases<br />c) Should have experience in database activities like instance tuning, schema management, space management, backup and recovery, disaster recovery, data replication, database refresh and others.</p></td><td style=\"height:94.45pt; vertical-align:top; width:204.15pt\"><ul><li>Install and maintain the performance of database servers.</li><li>Develop processes for optimizing database security.</li><li>Set and maintain database standards.</li><li>Manage database access.</li><li>Performance tuning of database systems.</li><li>Install, upgrade, and manage database applications.</li><li>Diagnose and troubleshoot database errors.</li><li>Recommend and implement emerging database technologies.</li><li>Create and manage database reports, visualizations, and dashboards.</li><li>Create automation for repeating database tasks.</li><li>Be available for on-call support as needed.</li></ul></td><td style=\"height:94.45pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:94.45pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:62.95pt; vertical-align:top; width:107.75pt\"><p><strong>Network Administrator</strong></p></td><td style=\"height:62.95pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: CCNA/MCSE or any other equivalent<br />c) Experience: Should possess at least 6 to 8 years of experience in Network administration domain experience in handling network infrastructure</p></td><td style=\"height:62.95pt; vertical-align:top; width:204.15pt\"><ul><li>Perform network design and capacity planning.</li><li>Installs and maintains network file servers and network operating systems; ensures that backup copies of all files are routinely made and securely stored at separate location; maintains system documentation.</li><li>Provides second level technical support to users concerning network system operations.</li><li>Diagnoses problems with network equipment and performs equipment repair or upgrades when appropriate.</li><li>Installs, configures, and maintains multi-user software to be accessed from file servers.</li><li>Administer and maintain end user accounts, permissions, and access rights.</li><li>Installs, configures, and maintains network cabling and other networking equipment such as hubs, switches, and UPS.</li><li>Oversee installation, configuration, maintenance, and troubleshooting of network connected end-user hardware, software, and peripheral devices</li><li>Manage security solutions, including firewall, anti-virus, and intrusion detection systems.</li><li>Works in close cooperation with Systems Analyst and Lead Information Technology Technician to facilitate management of computer labs, installing any software needed for each semester and/or special seminars.</li><li>Works with System Administrator and Director of Institutional Services in planning, installation, and documentation of network topology and Virtual Desktop Infrastructure</li></ul></td><td style=\"height:62.95pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:62.95pt; vertical-align:top; width:85.45pt\"><p>Home / Field</p></td></tr><tr><td style=\"height:72.5pt; vertical-align:top; width:107.75pt\"><p><strong>Network Support Engineer 1 </strong></p></td><td style=\"height:72.5pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology from a reputed University or College or Institute</p><p>b) Certifications: MCSE/CCNA certification preferred</p><p>c) Experience: Should possess at least 6 to 8 years of experience as network support engineer</p></td><td style=\"height:72.5pt; vertical-align:top; width:204.15pt\"><ul><li>Providing primary backup for networks should they fail</li><li>Ensuring the effective administration of a new business network</li><li>Performing troubleshooting on all programs when required</li><li>Preparing post-mortem reports and performing trend analysis when there are system failures</li><li>Developing and maintaining all of the comprehensive documentation with the implemented network</li><li>Assisting other departments when it comes to localised issues</li><li>Coordinating with various departments to help develop a network design that runs smoothly</li><li>Managing all the technical network resources for both projects and the business as a whole</li><li>Ensuring there is an optimal level of technical backup at all times</li><li>Monitoring network performance to determine if adjustments need to be made.</li><li>Operating master consoles to monitor the performance of networks and computer systems.</li></ul></td><td style=\"height:72.5pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:72.5pt; vertical-align:top; width:85.45pt\"><p>Field</p></td></tr><tr><td style=\"height:74.65pt; vertical-align:top; width:107.75pt\"><p><strong>Network Support Engineer 2</strong></p></td><td style=\"height:74.65pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Time Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology &nbsp;&nbsp;from a reputed University or College or Institute<br />b) Certifications: Any certification related to networking<br />c) Experience: Should possess at least 3 to 5 years of experience as network support engineer</p><p><br />&nbsp;</p></td><td style=\"height:74.65pt; vertical-align:top; width:204.15pt\"><ul><li>Providing primary backup for networks should they fail</li><li>Ensuring the effective administration of a new business network</li><li>Performing troubleshooting on all programs when required</li><li>Preparing post-mortem reports and performing trend analysis when there are system failures</li><li>Assisting other departments when it comes to localized issues</li><li>Coordinating with various departments to help develop a network design that runs smoothly</li><li>Ensuring there is an optimal level of technical backup at all times</li></ul></td><td style=\"height:74.65pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:74.65pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr><tr><td style=\"height:100.3pt; vertical-align:top; width:107.75pt\"><p><strong>Technical Support</strong></p></td><td style=\"height:100.3pt; vertical-align:top; width:221.55pt\"><p>a) Education: Full Post Graduation in Computer Science / Computer Application / Information System Management / Information Technology or B. Tech / B.E. in Computer Science / Information Technology&nbsp;&nbsp; from a reputed University or College or Institute</p><p>b) Certifications: Networking or any other relevant technical certification</p><p>c) Experience: Should possess at least 3 to 5 years of experience in technical support</p><p>&nbsp;</p></td><td style=\"height:100.3pt; vertical-align:top; width:204.15pt\"><ul><li>Collaborating with the IT department on the deployment and maintenance of network technologies.</li><li>Installing, configuring, and updating network software, as well as maintaining hardware and network devices.</li><li>Optimizing server capacity to keep up with demand in online traffic.</li><li>Testing network protocols and ensuring stable and secure server connectivity.</li><li>Training junior IT personnel, providing onsite or remote or technical support, and preparing user manuals.</li><li>Documenting network processes and layouts, as well as enhancing network security.</li></ul></td><td style=\"height:100.3pt; vertical-align:top; width:64.85pt\"><p>36</p></td><td style=\"height:100.3pt; vertical-align:top; width:85.45pt\"><p>Home</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Capacity-building program &nbsp;</strong></li></ol><p>System Integrators shall refer to Annexure-V for the Training and Capacity Building that shall give detailed scope on the Training Requirements, Scheduling the Training Calendar, number of trainings and their different types that shall be given along with the proper training aids, for TNUHDB Officials and Other Stakeholders.</p><p>&nbsp;</p><ol><li><strong>Project deliverables / Timeline / Payment schedule</strong></li></ol><table border=\"1\" cellspacing=\"0\" style=\"width:104.82%\"><thead><tr><td style=\"background-color:#e7e6e6; height:21.35pt; width:4.54%\"><p><strong>#</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:64.92%\"><p><strong>Scope Activity / Deliverable of SI</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:16.02%\"><p><strong>Timeline completion</strong></p></td><td style=\"background-color:#e7e6e6; height:21.35pt; width:14.52%\"><p><strong>Payment Schedule</strong></p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>PLANNING &amp; SOLUTION DESIGN</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>1</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Signing of contract between SI and TNUHDB</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T</p></td><td rowspan=\"2\" style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>2</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Project charter and Work Plan document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 1 month</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>3</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Business Requirement and SRS document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 2 months</p></td><td rowspan=\"3\" style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>4</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of HLD and LLD solution design document</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 3 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>5</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Change Management and Capacity Building Plan</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T+ 3 months</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>IMPLEMENTATION </strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>6</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Submission of IT Hardware, Network infrastructure, Support Software procurement plan</p></td><td style=\"height:21.35pt; width:16.02%\"><p>T + 4 months</p></td><td rowspan=\"4\" style=\"height:21.35pt; width:14.52%\"><p>15% of Capex</p></td></tr><tr><td style=\"height:32.05pt; width:4.54%\"><p>7</p></td><td style=\"height:32.05pt; width:64.92%\"><p>Supply, install, configuration, commissioning of required IT infrastructure networking equipment, NoC as part of technical solution, Cloud DC, DR</p></td><td style=\"height:32.05pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:25.1pt; width:4.54%\"><p>8</p></td><td style=\"height:25.1pt; width:64.92%\"><p>Supply, install, configuration, commissioning of required IT infrastructure for end users</p></td><td style=\"height:25.1pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:22.75pt; width:4.54%\"><p>9</p></td><td style=\"height:22.75pt; width:64.92%\"><p>Supply, install, configuration of Support software for Technical wing and end users</p></td><td style=\"height:22.75pt; width:16.02%\"><p>T + 6 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>10</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Digitization and Data Migration</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 7 months</p></td><td style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>11</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Application Development / Customisation of solution</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td><td rowspan=\"6\" style=\"height:13.45pt; width:14.52%\"><p>20% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>12</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Application Cloud hosting in DC and DR</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>13</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Integration Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 8 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>14</p></td><td style=\"height:13.45pt; width:64.92%\"><p>System Integration Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>15</p></td><td style=\"height:13.45pt; width:64.92%\"><p>User Acceptance Test</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>16</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Test reports</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>17</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Submission of Project Documentation, User Manuals, SoPs</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 9 months</p></td><td rowspan=\"2\" style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>18</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Training, Capacity Building, Change Management</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 10 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>19</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Pilot implementation of PMS, ERP, Portal applications</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 11 months</p></td><td rowspan=\"2\" style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>20</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Submission of &quot;Lessons Learnt&quot; and Solution Update based on Pilot Implementation (Including UAT and Certification)</p></td><td style=\"height:21.35pt; width:16.02%\"><p>T + 11 months</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>21</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Third party security audit and certification</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 12 months</p></td><td style=\"height:13.45pt; width:14.52%\"><p>5% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>22</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Go-Live</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 12 months</p></td><td style=\"height:13.45pt; width:14.52%\"><p>15% of Capex</p></td></tr><tr><td style=\"height:13.45pt; width:4.54%\"><p>23</p></td><td style=\"height:13.45pt; width:64.92%\"><p>Solution stabilisation &amp; Handholding to TNUHDB</p></td><td style=\"height:13.45pt; width:16.02%\"><p>T + 14 months</p></td><td style=\"height:13.45pt; vertical-align:bottom; width:14.52%\"><p>10% of Capex</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>OPERATION &amp; MAINTENANCE</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:45.1pt; width:4.54%\"><p>24</p></td><td style=\"height:45.1pt; width:64.92%\"><p>Quarterly Operation and Maintenance Support + Quarterly SLA Compliance Report</p></td><td style=\"height:45.1pt; width:16.02%\"><p>Every quarter for O&amp;M period</p></td><td style=\"height:45.1pt; vertical-align:bottom; width:14.52%\"><p>~8.31% of OPEX per Quarterly (OPEX equally amortized across 12 quarters, time of 3 years)</p></td></tr><tr><td style=\"background-color:#e7e6e6; height:13.45pt; width:4.54%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:64.92%\"><p><strong>PROJECT HANDOVER &amp; EXIT</strong></p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:16.02%\"><p>&nbsp;</p></td><td style=\"background-color:#e7e6e6; height:13.45pt; width:14.52%\"><p>&nbsp;</p></td></tr><tr><td style=\"height:21.35pt; width:4.54%\"><p>25</p></td><td style=\"height:21.35pt; width:64.92%\"><p>Handing over of maintenance, user training and knowledge transfer</p></td><td style=\"height:21.35pt; width:16.02%\"><p>&nbsp;36th month of O&amp;M period</p></td><td style=\"height:21.35pt; vertical-align:bottom; width:14.52%\"><p>10% of Capex</p></td></tr></thead></table><p>&nbsp;</p><p>Note: Capex (Capital Expenditure) and Opex (Operational Expenditure) to be quoted by the firm (System Integrator)</p><ol><li><strong>Compliance to Standards</strong><ol><li>Adherence to Open-Source Standard</li></ol></li></ol><p>The solution for this project must be designed following open standards, to the extent feasible and in line with overall system requirements set out in this RFP, to provide for good inter-operability with multiple platforms and avoid any technology or technology provider lock-in.</p><ol><li><ol><li>Compliance with Government standards &amp; policies</li></ol></li></ol><p>The solution proposed by SI in response to this RFP, must comply with all the relevant standards and policies related to e-Governance application development published by Government of India, which includes:</p><ol><li>Ministry of Electronics and Information Technology, Government of India as updated from time to time. The latest version of the standards may be found at https://egovstandards.gov.in</li><li>National Informatics Corporation The latest version of the standards may be found at https://web.guidelines.gov.in&nbsp;</li><li>Guidelines for Indian Government Websites (GIGW), available at: http://darpg.gov.in/sites/default/files/Guidelines_for_Government_websites_0_0.pdf</li><li>&ldquo;Policy on Open Application Programming Interfaces (APIs) for Government of India&rdquo; available at: http://www.egazette.nic.in/WriteReadData/2015/164238.pdf</li><li>&ldquo;Policy on Adoption of Open-Source Software for Government of India&rdquo; available at URL http://www.egazette.nic.in/WriteReadData/2015/163746.pdf</li><li>Information Technology Act 2000 (revised 2008) (http://www.meity.gov.in/content/information-technology-act)</li><li>CERT-In security guidelines for Indian Government websites (http://www.cert-in.org.in/)</li><li>E-SAFE Guidelines for Information Security (http://egovstandards.gov.in/&nbsp; )</li><li>e-Governance Standards for Preservation Information Documentation of e-Records (http://egovstandards.gov.in/&nbsp; )</li><li>e-Governance standards on Biometric standards (http://egovstandards.gov.in/&nbsp; )</li><li>Framework and Guidelines for Use of Social Media for Government Organizations (http://meity.gov.in/writereaddata/files/Approved%20Social%20Media%20Framework%20and%20Guidelines%20_2_.pdf)</li><li>Guidelines for Indian Government Websites (http://egovstandards.gov.in/ )</li><li>InDEA (India Digital Ecosystem Architecture (https://www.meity.gov.in/india-enterpise-architecture-indea )</li><li>Digital Personal Data Protection (https://www.meity.gov.in)<ol><li>Compliance with Industry Standards</li></ol></li></ol><p>In addition to above, the proposed solution must be based on and compliant with industry standards (their latest versions as on date) wherever applicable. This will apply to all the aspects of solution including but not limited to design, development, security, installation, and testing. There are many standards that are summarized below. However, the list below is for reference purposes only and is not to be considered as exhaustive.</p><ol><li>Portal development W3C specifications</li><li>Information access/transfer protocols SOAP, HTTP/HTTPS</li><li>Photograph JPEG (minimum resolution of 640 x 480 pixels)</li><li>Scanned documents TIFF (Resolution of 600 X 600 dpi)</li><li>Biometric framework BioAPI 2.0 (ISO/IEC 19784-1:2005)</li><li>Latest HTML standards<ol><li>Single-Sign On</li></ol></li></ol><p>The proposed solution should enable single-sign-on so that any user once authenticated and authorized by system is not required to be re-authorized for completing any of the services in the same session. For employees of the TNUHDB concerned, the browser-based application accessed on the intranet, through single-sign-on mechanism, will provide access to all the services of the departments concerned (based on their roles and responsibilities), Help module, basic and advanced reporting etc. Similarly, for external users (citizens and others), based on their profile and registration, the system shall enable single sign on facility to apply for various services, integration with existing TNUHDB applications, external applications, submit queries /complaints and check status of their applications.</p><ol><li><ol><li>Support for PKI based Authentication and Authorization</li></ol></li></ol><p>The solution shall support PKI based Authentication and Authorization, in accordance with IT Act 2000, using the Digital Certificates issued by the Certifying Authorities (CA) such as MTNL or NIC or Maharashtra Government authorized agency. Two factor authentications (login id &amp; password and digital signature) shall be implemented by the SI for officials/employees involved in processing citizen services as per the Functional requirement specification of the services specified in RFP.</p><ol><li><ol><li>Interoperability Standards</li></ol></li></ol><p>Keeping in view the evolving needs of interoperability, especially the possibility that the solution shall become the focal point of delivery of services and may also involve cross functionality with the e-Government projects of other departments / businesses in future, the solution should be built on Open Standards. Some of the states already have other applications deployed and running for delivering services to citizens. The SI shall ensure that the application developed is easily integrated with the existing applications. Every care shall be taken to ensure that the code does not build a dependency on any proprietary software, particularly, using proprietary &lsquo;stored procedures&rsquo; belonging to a specific database product.</p><ol><li><ol><li>Scalability</li></ol></li></ol><p>One of the fundamental requirements of the proposed application is its scalability. The architecture should be proven to be scalable (cater to increasing load of internal and external users and their transactions) and capable of delivering high performance for at least four years from the date of deployment. In this context, it is required that the application and deployment architecture should provide for Scale-Up and Scale out on the Application and Web Servers, Database Servers, and all other solution components.</p><ol><li><ol><li>Security</li></ol></li></ol><p>The systems implemented for project should be highly secure, considering that it is intended to handle sensitive data relating to the TNUHDB departments, and others. The overarching security considerations are described below.</p><ol><li>The security services used to protect the solution shall include Identification, Authentication, Access Control, Administration and Audit and support for industry standard protocols.</li><li>The solution shall support advanced user authentication mechanisms including digital certificates and biometric authentication (wherever it is required like at Data Centre).</li><li>Security design should provide for a well-designed identity management system, security of physical and digital assets, data and network security, backup and recovery and disaster recovery system.</li><li>The solution should provide for maintaining an audit trail of all the transactions and should also ensure the non-repudiation of audit trail without impacting the overall performance of the system.</li><li>The overarching requirement is the need to comply with ISO 27001 standards of security.</li><li>The application design and development should comply with Open Web Application Security Project [OWASP] top 10 principles.</li></ol><p>An indicative list of information security requirements which are to be followed by SI is specified below. During the SRS preparation phase, this may be modified in concurrence with TNUHDB.</p><p><em>Indicative list of information security requirements</em></p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:22.25pt\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; width:130.5pt\"><p><strong>Security Areas</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:314.75pt\"><p><strong>Specifications</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Physical Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>DC, Experience Centre, other assigned to SI should be physically secured by the SI.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Network Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Appropriate firewalls, IPS, SSL devices etc. should be used to ensure Network security</li><li>The solution should support SSL encryption mechanism for transferring data across network and between client and server</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>System Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Adequate access control procedures should be defined to secure the entire IT system, physically and logically.</li><li>The access controls procedures should cover all stages in the life cycle of user access, from the initial registration of new users to the final deregistration of users who no longer require access to information systems and services.</li><li>The system should have two factor authentication mechanism either through One Time Password (OTP) or soft tokens-based technologies for access control and user authentication.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Application Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The solution should have appropriate authentication mechanisms</li><li>Application user authentication &amp; authorization related transactions should be encrypted.</li><li>Operating system should be hardened on which the application is installed.</li><li>A web application firewall shall be deployed to secure the web-layer.</li><li>The web applications should be free from OWASP / SANS and CERT-IN web application vulnerabilities as released from time to time.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Audit Trails &amp; Logs</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Event logging should create an accurate record of user activity such as which users accessed which system, and for how long.</li><li>The solution should log all types of events especially those related to security</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Data Protection</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The solution should support SSL encryption mechanism for transferring data across network. Provision should be made to ensure that data in any form should not be copied on to any external media without authorization.</li><li>The data transferred across network should be encrypted using Public Key (PKI) Infrastructure.</li><li>Complete end point data protection should be provided at client site such that any type of data pilferage using unauthorized copying, storing, and emailing could be prohibited.</li><li>Access to all system resources including data files, devices, processes, and audit files should be provided to the intended users only.</li><li>All mobile applications should be designed and developed in a way that it ensures security of the application and data on the device.</li><li>Ensure to protect documents by assigning security parameters and criteria to provide more effective protection for an electronic document to maintain Confidentiality, Authorization, Accountability, Integrity, Authenticity and Non-repudiation.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Session Management</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>The system should limit to only one session per user or process ID.</li><li>The system should put a limit on the maximum time length of an idle session, which should ensure that automatic session termination takes place after expiry of the specific time length.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Data Warehouse Security</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Users must not have access to the data warehouse prompt of the application. Access to the data warehouse prompt must be restricted only to the database administrator.</li><li>&ldquo;Super user&rdquo; rights for the data warehouse must only be given to the administrator and the activities of these accounts must be properly logged.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Application Deployment</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>All unused ports should be blocked at server machines.</li><li>The application server should be segregated from internet zone through firewall or other filtering mechanism.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Information Security Governance</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>The employees working on the project should be made aware of his or her responsibilities with respect to Information Privacy and Information Security.</li><li>Employees working on the project shall undergo security awareness training during induction.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Storage Equipment</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>All information storage media (e.g., hard disks, magnetic tapes and others) should be physically secured.</li><li>Physical access to magnetic tape, disk, and others should be restricted to authorized personnel.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Computing Environment</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>All workstation hardware and associated peripheral equipment at Client site premises should be marked with a unique asset identification code. The asset identification code should follow a defined naming convention that would uniquely and appropriately identify the asset.</li><li>USB ports should be disabled on specified desktops / laptops at Client site premises, to prevent use of pen drives, external disk drives etc.</li><li>IT assets inventory must contain criticality of hardware in levels of importance (Confidentiality, Integrity and Availability).</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Email Security</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Email must have protection from inbound and outbound email threats. It should report compliance violations by scanning all inbound and outbound email content and attachments for sensitive data, real-time protection from spam, phishing, viruses, spoofing, zombies, directory harvest (DHA), Denial of Service (DoS) and other attacks.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Virus Control</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>Latest version of anti-virus should be installed on workstations and servers at Client premises.</li><li>The anti-virus software should run on network file servers on a regular basis (preferably daily).</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Compliance to Security Standards</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>Software/Hardware system should comply with &lt;ISO/IEC 27001:2015&gt;.</li></ul></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"vertical-align:top; width:130.5pt\"><p>Security Information and Event Management System (SIEM)</p></td><td style=\"vertical-align:top; width:314.75pt\"><ul><li>SI should install SIEM for Real-time analysis of security alerts generated by applications and infrastructure.</li></ul></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:22.25pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; width:130.5pt\"><p>Database Activity Monitoring (DAM) Solution</p></td><td style=\"background-color:#d9e2f3; width:314.75pt\"><ul><li>SI should install DAM to monitor all database activities and internal users with privileged access.</li></ul></td></tr></tbody></table><p>&nbsp;</p><ol><li><ol><li>Application Architecture</li></ol></li><li>It has been proposed that the applications designed and developed for the departments concerned must follow some best practice and industry standards. To achieve the high level of stability and robustness of the application, the system development life cycle must be carried out using the industry standard best practices and adopting the security constraints for access and control rights. The various modules / application should have a common Exception Manager to handle any kind of exception arising due to internal/external factors.</li><li>Similarly, the modules of the application are to be supported by the Session and Transaction Manager for the completeness of the request and response of the client request. The system should have a module exclusively to record the activities/ create the log of activities happening within the system / application to avoid any kind of irregularities within the system by any User / Application.<ol><li>Proposed Application Architecture</li></ol></li></ol><p>An indicative 3-tier architecture (also referred to as multi-tier or N-tier architecture) has been proposed for the Application Solution.</p><p>The entire processing should take place in n-tier architecture:</p><ol><li>Front-end software (client tier) - responsible for the presentation of information and provides user interface.</li><li>Business Process / Service Layer &ndash; In the long SSDG may be used, as an Integrated Framework for delivery of Services.</li><li>Application Layer &ndash; The Business logic for all the application as per the FRS document</li><li>Database Layer - responsible for the manipulation and storage of data.</li></ol><p>&nbsp;</p><ol><li><ol><li>High Level Design (HLD)</li></ol></li></ol><p>Once the SRS are approved, the SI shall complete the High-Level Designing and all HLD documents of all the functionalities, integration with existing application and external application. The SI shall prepare the HLD and have it reviewed and approved by the TNUHDB will sign off on the HLD documents based on the advice of PMC.</p><ol><li><ol><li>Detailed (Low Level) Design (LLD)</li></ol></li></ol><p>The LLD shall interpret the approved HLD to help application development and shall include detailed service descriptions and specifications, application logic (including &ldquo;pseudo code&rdquo;) and UI design (screen design and navigation). The preparation of test cases will also be completed during this stage. The SI shall have the design documents reviewed and approved by the TNUHDB. TNUHDB will sign off on the LLD documents based on the advice of PMC.</p><ol><li><ol><li>Test Plan</li></ol></li></ol><p>Once the SRS is approved and design is started, the SI shall prepare all necessary Test Plans (including test cases), i.e., plans for Acceptance Testing. Test cases for Initial and Final User Acceptance Testing shall be developed in collaboration with domain experts identified at TNUHDB. Initial and Final User Acceptance Testing shall involve Test Case development, Unit Testing, Integration and System Testing, Functional testing of Application, Performance testing of the Application including measurement of all Service Levels as mentioned in this RFP and finally SI shall also carryout Load/ Stress testing. The SI will submit the test plans and test result reports to TNUHDB for comprehensive verification and approval.</p><ol><li><ol><li>Specification</li></ol></li><li>Fingerprint scanning IAFIS specifications</li><li>Digital signature RSA standards</li><li>Document encryption PKCS specifications</li><li>Information Security to be ISO 27001 compliant</li><li>Operational integrity &amp; security management to be ISO 17799 compliant</li><li>IT Infrastructure management ITIL / EITM specifications</li><li>Service Management ISO 20000 specifications</li><li>Project Documentation IEEE/ISO specifications for documentation</li><li>Workflow design WFMC Standards</li><li>Information access/transfer protocols W3C Specifications</li><li>Portal Development - W3C, GIGW</li><li>Software Development - CMMI Level 3 and above</li><li>Interoperability - Web Services, Open Standards</li><li>Document encryption - PKCS specifications</li><li>Information Security - ISO 27001 certification (or above) *</li><li>IT Infrastructure management - EITM specifications</li><li>Service Management - ISO 20000 specifications (or above)</li><li>Project Documentation - IEEE/ISO specifications for documentation</li><li>Records Management - ISO 15489 certification (or above) *</li></ol><p>* The SI shall get the entire facility (Record Management Facility) certified with respect to the above specification. The cost for the same will be borne by the SI. These are mandatory requirements. The ISO 15489 certification for Records Management shall be obtained on &ldquo;Acceptance&rdquo;, ISO 9001 certification within 3 Months of &ldquo;Acceptance&rdquo;, &ldquo;CMMI Level 3 or above&rdquo; within 6 months of &ldquo;Acceptance&rdquo; and ISO 27001 Certification within 6 Months of &ldquo;Acceptance&rdquo;. Any delay in the timelines mentioned above, payments to the SI shall not be made.</p><ol><li><ol><li>Non-Functional Requirements</li></ol></li></ol><p>The non-functional requirements for this project which are to be delivered by the SI are provided in table mentioned below.</p><ol><li><ol><li><ol><li>General system</li></ol></li></ol></li><li>The System will have to compliance the specifications mentioned in this RFP and with GoI guidelines under &ldquo;standards of e-governance application/ e-Gov. standards&rdquo; (available at http://egovstandards.gov.in/)</li><li>The solution must comply with MEITY&rsquo;s security guidelines, compliances, regulations, and other guidelines as well as policies. The technical solution of Digitalization project must be in conformance with e-Governance Standards of MEITY. The entire solution must be capable of incorporating any changes because of changes in the regulations and policies of the government from time to time.</li><li>The services rendered by TNUHDB must comply with The Tamil Nadu Information Technology (Electronic Service Delivery) Rules, 2016.</li><li>System should allow the users to deploy the application on various environments</li><li>The system will be scalable enough to accommodate a large population of users. The number of TNUHDB users are envisaged to be nearly 1000 at TNUHDB and 4100 external users. The concurrent users will be nearly 1000.</li><li>The System will be designed and developed to support a 16/7 production environment and reporting system</li><li>The system should be developed on the principles of SOA</li><li>Should be compatible with the latest versions of all browsers like IE, Microsoft Edge, chrome, Firefox, Mozilla etc.</li><li>The external portal development should adhere to GIGW (Government of India guidelines for website)</li><li>It should be interoperable with other web applications and for this the system must be following W3C and REST based web services standards on &ldquo;web-design and application</li><li>The system must be flexible enough to accommodate other languages in near future as may be demanded by TNUHDB</li><li>The solution should be provided along with the product manuals, user manuals and functional specifications.</li><li>The solution should maintain a database of frequently asked questions (FAQ).</li><li>The process for removing unnecessary code from the application after it is released should be documented.</li><li>Application code should not contain invalid references to network resources (Pathnames, URLs etc.).</li><li>Single Sign On facilities to be provided for all Digitalization solution applications</li><li>The full application should be able to support clustering, load balancing, high availability, and failover mechanism both vertically and horizontally</li><li>Availability of Integration layer as an independent service component is available for SOA based integration with different TNUHDB and external systems.</li><li>Capable of business process-based orchestration</li><li>Supports integration with SMTP for email integration for sending real time emails linked to business processes</li><li>Supports integration with the SMS gateway (Short Messaging Service) to send SMSs</li><li>Provide audit trails, auditing of user actions and document history</li><li>The System will inform the user of errors based on the validations performed</li><li>The System will allow the user to review and update information if there are correctable errors</li><li>The System will contain a &quot;help&quot; function on each screen as needed to provide users with instructions on how to perform functions, descriptions of data elements and/or other information</li><li>The System will have role-based access control at the data field level</li><li>The System will have a user interface written in Tamil (Unicode font), English (including warnings, notifications and user prompts) free of grammatical errors and typos</li><li>The System will authenticate users before allowing access to functionality requiring a login<ol><li><ol><li>Interoperability &ndash; Integration</li></ol></li></ol></li></ol><ol><li>SI shall be responsible for all integration and associated testing/quality assurance of all Products, including but not limited to -<ol><li>Data / API / Connectivity / Database integration and testing.&nbsp;</li></ol></li></ol><ol><li><ol><li>Hardware / software configuration, installation, integration, and testing.</li><li>Uptime testing and diagnostics.</li></ol></li><li>The System&#39;s interfaces will secure and protect the data and the associated infrastructure from a confidentiality, integrity, and availability perspective.</li><li>The System&#39;s interface infrastructure shall continue to operate despite failure or unavailability of individual technology components such as a server platform or network connection.</li><li>The System&#39;s interfaces must be scalable to accommodate changes in scale including changes in user population, transaction volume and throughput. The System will be capable of making any changes to the interface data elements/layouts easily, and to test those changes.</li><li>The System will implement, at a minimum, interfaces (both real-time and batch) with the systems requiring integration and data sources using APIs</li><li>The System will provide the capability to perform source to destination file integrity checks for exchange of data and alert appropriate parties with issues</li><li>Systems components will be committed to an advanced approach to interoperability using web services and Service Oriented Architecture (SOA)</li><li>Systems will provide the ability to publish services and related data to be used by different types and classes of external and internal systems.</li><li>Systems will provide the capabilities for a Real-Time (or near real-time) Integrated systems where data is easily shared across systems with appropriate adherence to security and privacy restrictions.</li><li>Message and data formats should be based on logical representations of business objects rather than native application data structures</li><li>The solution should support delayed message delivery in case of transmission failure. It shall support putting failed messages in redelivery queue for retransmission<ol><li><ol><li>Work-flow Management</li></ol></li></ol></li></ol><ol><li>System should support easy workflow configuration, its maintenance, and need based modification, addition alteration of the steps</li><li>System should offer performance monitoring features for the business processes. The system shall be capable of identifying, reporting inefficient processes and operations and/or those with high level of error and omission</li><li>The solution should have the ability to support automated workflow designed to address needs of business users</li><li>System should provide option to define KPI (Key Process Indicators) on processes and enable dashboard and drilldown reports on KPI.<ol><li><ol><li>Security</li></ol></li></ol></li></ol><ol><li>The SI should prepare information security policy and supporting procedures for ISO 27000:2016 certifications. The policy and procedure should be submitted prior to Go-Live.</li><li>The TNUHDB Digitalization systems must be in compliant with Information security standards and guidelines for e-Governance in India.</li><li>SI should develop a privacy policy to be posted on the web portal. Privacy policy should be in line with the government of India&rsquo;s policy on information security.</li><li>The system should be capable incorporating validation checks into applications to detect any corruption of information through processing errors or deliberate acts.</li><li>The system should validate the data output from an application to ensure that the processing of stored information is correct and appropriate to the circumstances</li><li>The system should implement secure error handling practices in the application<ol><li><ol><li>Use administration and authentication</li></ol></li></ol></li></ol><ol><li>The system must administer the various users, their rights and must provide for authorization of users</li><li>Authentication should be done centrally and in should be in consonance with the user base. It should provide for user with username and passwords</li><li>The system must provide for password reset procedure, compulsory password reset after 90 days, ability to configure the number of permissible log-in attempts, ability to provide automatic time out (log out) for user,</li><li>System should allow the users to archive details of registered users</li><li>System should allow the users to assign / integrate digital signatures to all registered users</li><li>It should provide logging by user and terminal, the date and time of all transactions with details of creation, reading, updating, deletion or printing.</li><li>Notify security administrator of unauthorized access or attempted access and record in a log with reporting.</li><li>The mobile application must be compatible with iOS and Android systems</li><li>It must support the entering of data on a real time basis</li><li>The system should support configuration setting for all types of mobile phones, smart phones, tablets etc.</li><li>It must support firewall and antivirus capability on mobile apps</li><li>The application must provide for administrative approval for updating and configuring mobile devices</li><li>The SI must ensure the secure configuration, data synchronization and sharing capabilities for mobile devices with authentication and authorization policy enforcement on document manipulation and application access.<ol><li><ol><li>General Conditions</li></ol></li></ol></li></ol><p>The framework and data structure developed shall be in compliance with the Reference Standard for Document and Cyber security launched by Government of Tamil Nadu</p><ol><li><strong>Data, local services, personnel, and facilities to be provided by the Borrower &nbsp;</strong></li></ol><p>For the effective implementation of the proposed solution, TNUHDB will provide following support and facilities to the System Integrator (SI):</p><ul><li>Provide support in reviewing the deliverables submitted by SI during the design and development stages of the project and provide necessary input and approval.</li><li>Provide required coordination support for deployment of the solution for TNUHDB users, offices, and stakeholders</li><li>Provide necessary physical documents, files, records for digitisation as per the scope of work for SI</li><li>Provide data formats of registers maintained in TNUHDB, application forms processed for services, management information reports required to enable design and development of digital solution as per requirement</li><li>Provide identified space / room for establishment of Network Operating Centre (NOC) in TNUHDB board office to house network and security equipment for enterprise resources like Network, Applications, Hardware, and Connectivity to be monitored</li><li>Provide identified space / room to Helpdesk support team to monitor and support the citizen.</li><li>Provide workspace for the SI team to deploy their personnel to work from TNUHDB office during implementation and Operation maintenance.</li><li>Provide identified space / room to PMC team to monitor and support the implementation of Digitisation of TNUHDB.</li><li>Provide support to all the above specified teams, by facilitating necessary civil works and office furniture across all TNUHDB offices. [Deloitte1]&nbsp;</li></ul><ol><li><strong>Operation and maintenance</strong></li></ol><p>SI shall operate and maintain all the components of this project after the commencement of the go-live date. During the O&amp;M phase, SI shall ensure that the service levels are monitored on a regular basis, where they meet the SLA criteria, and shall be reported to TNUHDB.</p><p>Post Go-Live, if any system/sub-system/appliance deployed during the O&amp;M phase then these components must be added in the <strong>TNUHDB systems only after proper induction procedures are followed including hardening and security testing.</strong></p><p>SI will ensure that at no time shall any data of TNUHDB Systems be ported outside the geographical limits of the country. O &amp; M is detailed in Annexure VI.</p><ol><li><strong>Institutional and organization arrangements.</strong><ol><li>Project Stakeholders</li></ol></li></ol><p>For the successful implementation of this project, it is important to have a clear understanding and execution of the roles and responsibilities of the three key stakeholders:&nbsp;</p><ul><li>TNUHDB&nbsp;</li><li>Consulting Firm (M/s Deloitte Touche Tohmatsu India LLP)&nbsp;</li></ul><ul><li>System Integrator (SI)/Vendor&nbsp;</li></ul><p><strong>TNUHDB: </strong>TNUHDB shall provide the overall guidance, project monitoring and coordination between various stakeholders for execution of the project. It shall also seek the necessary approvals as required from the concerned officials and Board.&nbsp;</p><p><strong>Consulting Firm (Deloitte):</strong> Deloitte shall prepare the digital strategy roadmap for TNHUDB, assist in preparing RfP, assist in bid management for the selection of the SI/vendor for the identified solutions in the roadmap and provide handhold support during the initial period after onboarding of the SI/vendor.&nbsp;</p><p><strong>SI/Vendor</strong>: The SI/Vendor shall be selected by TNUHDB who shall then carry out the implementation of solutions proposed as per the terms and conditions laid out in the RfP.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Project Governance Structure</li></ol></li></ol><p>A clear definition of the roles and responsibilities of all the stakeholders in a project establishes transparency, accountability, manageability, and efficiency of the project. The governance structure that facilitates the coordination and implementation of project activities and fosters interactions among the team members with a minimum number of disruptions, overlaps and conflict.</p><p>&nbsp;</p><p>Three-tier project management structure:</p><ul><li>Project Leadership Team (office of TNUHDB)</li><li>Project Implementation Committee (PIC) with PIC members and Project Coordination Team</li><li>Project Management Consultant (PMC)</li><li>Implementation Agency (System Integrator / Vendor)</li></ul><p><br />Governance Structure and Responsibility is detailed in Annexure VII</p><p>&nbsp;</p><ol><li><ol><li>Communication Protocols&nbsp;</li></ol></li></ol><p>To ensure timely completion of project activities the following modes for communications are proposed medium, submission of work outputs as mentioned into the following sub-sections.&nbsp;</p><p>Review Meetings&nbsp;</p><p>The review meetings would be the primary and most frequent mode of communication.&nbsp;</p><ul><li>These would be held at periodic intervals&nbsp;</li><li>These would be utilized to take stock of the progress made and discuss the roadblocks being faced.&nbsp;</li><li>Such meetings would normally be attended by representatives from SI and TNUHDB team.&nbsp;</li><li>Among other things progress review in line with the project schedule, progress on the previous meeting output, identification of newly evolved risks and finalization of actionable items as an outcome of the meeting would be discussed.&nbsp;</li></ul><p>&nbsp;</p><p>Suitable online mediums for meeting shall be leveraged wherever required to organise and conduct virtual meetings to facilitate effective and efficient way communications.&nbsp;</p><p>Also, to ensure that there is a two-way communication, all the minutes of the meeting will be recorded and shared with client within 5 working days of the meeting. Such minutes of meeting should be accepted in whole or with changes</p><p>&nbsp;</p><ol><li><ol><li>Progress Reports/ Reports/Notes&nbsp;</li></ol></li></ol><p>Periodic project status report would be submitted by SI highlighting the status of all activities undertaken and the issues requiring attention. The periodic progress reports shall be submitted as per the project plan&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Communication medium</li></ol></li></ol><p>Email - To facilitate fast action on technical aspects, quick decision making and resolution of issues, both the consultants and client would make extensive use of emails exchanges. Communications will also be marked to the representative of TNUHDB.&nbsp;</p><p>Other virtual medium &ndash; Virtual meeting rooms on various online platforms like MS teams/Zoom/ others shall also be used for holding any meeting, discussion which are not possible to conduct in person.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Submission of Work Outputs&nbsp;</li></ol></li></ol><p>SI shall submit its work outputs, recordings of minutes, requests for documentation in English language only through the SI mail id. Any communication from non-SI mail id related to project work outputs should not be considered as formal communication from SI.&nbsp;</p><p>&nbsp;</p><ol><li><ol><li>Quality Assurance Plan</li></ol></li></ol><p>SI would deploy its tailormade quality assurance and management process in consultation with TNUHDB officials and associated stakeholders through implementing and managing a series of quality practices over the lifecycle of the assignment. SI shall ensure that the assessment and deliverable meet the suitable quality standards.</p><p>&nbsp;</p><ol><li><ol><li>Change management and risk management&nbsp;</li></ol></li></ol><p>Change Management&nbsp;</p><p>Any change, which may result in enhancement to geographical, functional or technical scope of work, postponement of the major milestones in the engagement plan, increase in resources, infrastructure or planned training sessions will be subject to the following process:</p><ul><li>Either TNUHDB or SI can raise a scope change request (&ldquo;SCR&rdquo;) accompanied by suitable supporting documents.&nbsp;&nbsp;</li><li>SI team will prepare an estimate of person month effort to be required together with an estimate of additional fees and likely impact on the resource plan for each SCR.</li><li>Consequent to formal approval by TNUHDB for the SCR together with cost and time estimates, the SI will then commence any work arising out of the SCR(s).&nbsp;&nbsp;</li></ul><p>Risk Management&nbsp;</p><p>Risks may arise or may be identified at any point through the engagement, and will be documented through a risk management log and be subject to the following process:&nbsp;</p><ul><li>SI identifies a relevant project risk accompanied by suitable supporting rationale. SI team will document the risk, probability, impact, and proposed mitigation actions.&nbsp;</li><li>Approval of the proposed mitigation plan/ actions will be required from the core committee.&nbsp;</li></ul><p>&nbsp;</p><ol><li><strong>Commencement Date</strong></li></ol><p>Probable date of Commencement of contract: 01.01.2024</p><ol><li><strong>Period of Contract</strong></li></ol><ul><li>12 months for project completion and Go-Live</li><li>2 Months for Solution stabilization from Go-Live, Handholding support to TNUHDB</li><li>Operation and Maintenance: 36 months from Go-Live</li></ul><ol><li><strong>Reporting arrangement</strong></li></ol><ul><li>Team Leader / Program Manager of System Integrator (SI) shall report to the Project Director/ Joint Managing Director, TNUHDB or his / authorized nominated officer</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure I &nbsp;- Solution / Implementation Approach</strong></p><p><strong>Solution / Implementation Approach</strong></p><p>Implementation of ERP, and digital solution for TNUHDB be planned seamlessly in a manner for effective deployment[Deloitte2]&nbsp;, cost effectiveness and ease of administration. The identified scope of work are listed below. The detailed scope of work and functional requirements for Essentials and Add On are provided in the Annexure II, Annexure III, Annexure IV in this ToR document.</p><ul><li>Essentials &ndash; Implementation and O&amp;M for 3 years<ul><li>Project Management System</li><li>Enterprise Resource Planning (ERP) System</li><li>Upgradation of Citizen Web Portal</li><li>TNUHDB Employee Portal</li><li>Enterprise Support Applications</li><li>Citizen Mobile Application</li><li>Support software (Design &amp; Planning)</li><li>Data Digitalization</li><li>IT Infrastructure (Server and Firewall for LAN)</li><li>IT and End User Infrastructure</li><li>(Desktop, Laptop, Peripherals)</li><li>Networking (wireless) (Board office)</li><li>Project Management Consultants</li><li>Cloud Hosting</li><li>Connectivity (Internet Charges)</li><li>Training</li><li>Helpdesk Support</li><li>Smart Module</li><li>Experience centre &amp; Citizen Kiosk</li></ul></li><li>Add On and O&amp;M for 3 years<ul><li>Networking (wireless for Divisions)</li></ul></li></ul><p>&nbsp;</p><p>&nbsp;</p><p>Solution approach taken considers implementation of essentials solution required for TNUHDB across all offices and users with 3-year operation and maintenance, followed by the implementation of additional components of networking (wireless for Divisions) with 3 year operation and maintenance.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure II- Track 1: Application design, development, and implementation</strong></p><ol><li><ol><li><ol><li>Scope of Application Development</li></ol></li></ol></li></ol><p>The scope of work will comprise development of Project Management System, ERP System, Citizen &amp; Employee Portal, Grievance Redressal Management, Document Management System, content management system, business intelligence and analytics platform &amp; MIS Dashboard and others as detailed below.</p><p>The application may be developed at SI&rsquo;s premises. However, the identified key personnel need to be based at TNUHDB&rsquo;s office/other designated locations during entire project duration. Development shall include Prepare Development Framework, Develop System Databases, Conduct Detailed Design, Establish Operations Functions, Complete Migration Design, Code Test Development Components. Before the actual development work starts, the SI must design the integrated solution architecture.</p><p><strong>Functional requirements of the proposed applications:</strong></p><p>This section provides the functional requirements of the overall Digitization solution. All the functional description provided in this section are minimum requirement and have been provided for immediate reference only.</p><p>The intended coverage of the functional specifications includes the following modules:</p><ol><li>Integrated Project Management System</li><li>ERP System for Administration, Finance &amp; Accounting, HRMS and Estate Management</li><li>TNUHDB Citizen Web Portal</li><li>Employee Portal with Task Dashboard, Knowledge Management System and MIS Dashboard</li><li>Helpdesk System</li></ol><p>High level functionalities of the proposed modules are listed in following section.</p><p><strong>Project Management System</strong></p><p>Proposed Project management System should have the following features.</p><ul><li>Project management system should be developed based on the need of technical wing.</li><li>It is expected to understand the process of various sections and functions operating under technical wing and automate the manual process for minimum manual interventions</li><li>It should leverage the communication between peer working group such as CRZ, Forest Clearance, Environment Clearance so as to prepare suitable Layout &amp; design for better outcomes of land identification and Digitization. Also, it should help in managing project documentation such as DPR, design drawings, test reports and invoices etc.</li><li>It should assist in preparation, capturing of estimation of quantities, technical specification, Bill of Material</li><li>It should assist in capturing of Structural design requirements, development, Soil Test Report (STR), Foundation and load bearing analysis.</li><li>It should enable Architectural Design Planning activities, preparation of type design, layout drawings, charting out of required planning permissions, clearances and NoC&rsquo;s from statutory and regulatory authorities, compliance to Rules and Frameworks required to be adopted for scheme development, building permissions, Urban Land Ceiling and Entre-upon-Permission details to be mapped with the Survey Sketches under e-Land Management Provision</li><li>It should assist technical and finance team in monitoring CAPEX and OPEX of project, deviations observed from the approved budget, agreed terms of the project contract and reporting to concerned</li><li>Modules built on common platform enabling access and synchronization on all devices through web application and mobile application</li><li>Mapping of advance technologies and techniques for evidence/data acquisition for</li><li>Geo tagging all progress inputs through mobile GIS architecture</li><li>Real time data inputs and real time dashboards for Executives, Project managers and Field Managers, also enables two-way data flow</li><li>Use of visualization tools and evidence to effectively represent the progress, challenges and analytics; enable faster decision making</li><li>It should be customizable to suite varied project types and scenarios</li><li>It should be integrated to various inhouse platforms to have easy access to all documents and guidelines related to project or portfolio</li><li>Integration with digital form of e-MBook (Measurement book), enabling detailed and abstract entries based on physical progress of the project, declaration, verification, and approval of concerned TNUHDB field engineers, staff, concerned EEs and contractor</li><li>The Proposed system should serve the broad functions of technical wing<ul><li>Workflow Management</li><li>Project Monitoring and Control with smart review provisions for periodical review and monitoring of progress of works at all sites</li><li>Task Scheduling</li><li>Resource &amp; Material Management</li><li>Collaboration</li><li>Tracking</li><li>Dashboard and Reports</li></ul></li><li>It should be accessible to all stakeholder such as Engineering Department, Project executives, PMU, board of directors and contractors.</li><li>To prepare Standardized Type Design and Estimates including development works like STP, Sump, etc., and to be stocked in TNUHDB Engineers&#39; Portal for utilizing in new construction projects</li><li>Encroachers within the scheme boundaries to be identified and regularized with revised layouts as per TNCDBR in consultation with CMDA/DTCP</li><li>Aadhaar, Ration Card and other details of existing beneficiaries/allottees in all the TNUHDB Scheme to be linked to avoid duplication of the beneficiaries in future allotment</li><li>Survey Sketches to be linked with details of sale deeds and drone surveys to be carried out for mapping with the existing survey sketches for internal reference</li><li>To issue Digital Sale Deeds, in collaboration with Registration Department</li><li>It should capture the entire process of application received from the public for allotments in TNUHDB tenements which will in turn be forwarded to Revenue Department for verification, and then goes for allotment</li></ul><p>&nbsp;</p><p>&nbsp;</p><p><strong>Enterprise Resource Planning System</strong></p><p><strong>Human Resource Management System (HRMS) for Administration</strong></p><p>The overall features of the HRMS shall be:</p><ul><li>It should capture and store detailed records of all employees and stores documents like, job descriptions, Aadhar Details, offer letters, appointment letters, performance reviews</li><li>Should automate processes such as Recruitment, onboarding, HR, Exit and for different roles in organization</li><li>It should monitor workers&rsquo; attendance and hours and measure things like employee productivity and absenteeism.</li><li>Should handle employee Feedback &amp; Performance Management</li><li>It should track not only hours worked but also paid time off (PTO)/sick days and benefits information.</li><li>It should store required information on every employee across the organization,</li><li>it should avoid duplicate or inaccurate data that many organizations store in</li><li>various spreadsheets.</li><li>Payroll submodule should fall under this, payroll sub-module automatically distributes pay cheques to employees on a set schedule with the appropriate taxes deducted</li><li>and handles expense reimbursement. It can also provide reports on payroll expenses, total overtime hours and similar KPIs.</li><li>Integration with other departments (e.g., Land registry, Labor, revenue</li><li>department &amp; Aadhar integration)</li><li>Integration with SMS Gateway and Email Server would provide real time notifications for Payroll users and employees.</li><li>The key functions of the module would be<ul><li>Digitized human resource data</li><li>Employee master data</li><li>Employee leave and attendance management</li><li>Employee performance management</li><li>Payroll management</li><li>Employee Service book Management &amp; Statutory compliance</li><li>Status of Court Cases</li></ul></li></ul><p>&nbsp;</p><p><strong>Finance &amp; Account Management </strong></p><p>The major functions of FMS module would be Finance Management, Accounting and Controlling Finances</p><ul><li>General accounting and financial close</li></ul><p>Tools for accounting and financial close support essential bookkeeping activities such as general ledger, accounts payable (AP), accounts receivable (AR) and payroll. They help teams generate reports, create financial statements for income, expenses, and balances &ndash; and close the books quickly and with less effort. Tax management features also help ensure tax accuracy and compliance.</p><ul><li>Revenue, cash, and treasury management</li></ul><p>With revenue accounting tools, finance teams can automate billing processes, view up-to-the-minute payments, and ensure compliance with statutory regulations for revenue recognition. Cash and treasury management tools help teams predict cash flow, improve liquidity, and proactively mitigate risk. This software also integrates with banking systems.</p><ul><li>Financial Planning and Analysis (FP&amp;A)</li></ul><p>This set of planning, forecasting, budgeting, and analytical tools help finance team and their teams support the overall financial health. FP&amp;A is critical for analysing costs and utilisation of schemes, cost savings, improving performance, predicting, and navigating future conditions and providing fast and accurate decision support. It also supports multi-scenario planning and collaboration between finance and every other department.</p><ul><li><ul><li>Governance, risk, and compliance:</li></ul></li></ul><p>It should help teams align organizational activities to business goals, identify and mitigate different types of risk, and ensure compliance with laws and regulations. By synchronizing data across corporate governance, risk management, and compliance activities, organization can operate more efficiently, navigate uncertainty, and act with integrity.</p><p>Financial management solution for TNUHDB could have following set of features,</p><ul><li>Track accounts payable and accounts receivables</li><li>Manage general ledger</li><li>Track of fund flows for various housing schemes</li><li>Track of fund flows from treasury to divisions</li><li>Track and identify the current demand on beneficiary contribution and maintenance charges</li><li>Manage financial transactions</li><li>Payment gateway integration via online as well as POS based system, QR Code, Scanners</li><li>SMS notifications to be sent to the defaulted payers</li><li>Acknowledgement of the payment receipt to be sent to the payee &nbsp;</li><li>Create and store financial documents such as status of Audit Paras, Income Tax Forms (Form-16)</li><li>Automate tasks related to billing, vendor payments, cash management and account reconciliation.</li><li>Integration with procurement/purchase department from Head office for release of money, Head-wise anticipated expenditure through financial management provision</li><li>Finance related to project tendering and construction works</li><li>Financial database which can be viewed and accessed easily by officials whenever required.</li><li>Integration with e-office Tool</li></ul><p><strong>Estate Management for Administration </strong></p><p>This major objective of this module should be overall dashboard of assets providing following information</p><ol><li>List of Assets i.e., lands, Plots, tenements, Offices</li><li>List of Services required for assets like existing vacant lands under TNUHDB Schemes, allotment, transfer, alienate, survey, Infrastructure, and amenities</li><li>Details of Maintenance of the assets, Infrastructure, and amenities (Water supply, Sewer line, Electricity, Lift)</li><li>Details of Revenue collected from tenements, payment arrear details, current demand on beneficiary contribution, maintenance charges and outstanding to be collected</li></ol><p>&nbsp;</p><p>The major features of this modules could be,</p><ul><li>All-In-One that meets every aspect of your estate operational management needs</li><li>Allows for a one-stop management solution of maintenance tasks.</li><li>Provide a seamless link to Service Level Agreements (SLAs) to enforce standards and increase efficiency.</li><li>Enables collection management of rent from tenants for different settlements</li><li>Report generation of collection from various settlements or tenements</li><li>Enables improved forecasting of budgets for maintenance within the town/estate.</li><li>Estate management cover for several areas that include property management, manage operations related finances. Estate management is mainly concerned with the supervising and directing of interest held on rented properties.</li><li>Services of TNUHDB are majorly related to land management, building maintenance, rent collection etc. hence, estate management should be a part of this integrated system.</li><li>In case of TNUHDB, estate Management module would help Revenue wing of Admin department. It would help maintain details of property maintenance and collecting the rent from rented properties.</li><li>This module can be a part of Administration section where different wings will cover and monitor respective activities mentioned below. Also, it can be integrated with other department&rsquo;s portal/site would be done for the mapping of data (if required).</li></ul><p><strong>Office Administration</strong></p><p>The major functions of Administration module would be:</p><ol><li>Tapal Management</li></ol><p>Key functions of Tapal Management would be to manage dispatches in organization</p><p>It would have following features</p><ul><li>Inward</li><li>Outward</li><li>Reminder/Follow up</li><li>Report</li><li>Personal Address Book</li><li>Expense Entry and Graphical summary</li></ul><p>&nbsp;</p><ol><li>Vendor Management</li></ol><p>This would manage the vendor onboarding and performance monitoring of vendors</p><p>It would have following features</p><ul><li>Procurement</li><li>Vendor Onboarding</li><li>Performance Management</li><li>Financial Controls &amp; Compliance</li><li>SLA Management</li></ul><p>&nbsp;</p><ol><li>Legal Resource Management</li></ol><p>This would manage the documents for all the legal matters such as court cases and hearings for judicial cases.</p><p>It should have following features</p><ul><li>Create draft</li><li>Review draft and approval</li><li>Document repository</li><li>Recorded Minutes of meetings</li><li>Contracts for review</li><li>Sharing of Documents</li></ul><p>&nbsp;</p><ol><li>RTI Request and Appeal Management Information System (RTI-MIS)</li></ol><p>This should enable users to keep track of all RTI applications, submitted response, appeals and their response. This data should be digitized and should be stored in repository for future reference and as a digitized back up copy. This module should have role-based access control approach for accessing all the documents in this module and repository. Generally, a public information officer should have access to this module which should have functions like RTI dashboard where all RTIs should be categorized as per their status like new, pending, responded, and marked to first Appellate authority (FAA).</p><ol><li>Fleet Management</li></ol><p>This module should track all the vehicles and control overall fleet operations. Also, should help to manage complete fleet control operations. Every vehicle servicing should be documented and accessible by Vehicle number, driver name and on-road time. It should cover the entire life cycle of the vehicle from purchase, usage, maintenance, and disposal.</p><p>&nbsp;</p><ol><li>Visitor Management</li></ol><p>Visitor management should offer an appointment portal for visitors by which they should digitally take the appointment from the concerned person. Visitors should issue a digital visitor id card by using the visitor portal, which retains all the specific information needed. Employees and co-worker should have accurate information about visitors</p><p><strong>Citizen Web Portal</strong></p><p>The proposed portal should be Multilingual (Tamil and English language) Web portal and with mobile (Android/ IOS) device support, having the content in Unicode format</p><p>The major modules of the portal would be as following</p><ol><li>Citizen Online Services: Where all citizen related services would be listed for ease in accessibility to TNUHDB services</li><li>Grievance Redressal Management System: This would be additional module to existing web portal where citizens, tenant and allottees can register their grievances about processes, operations, register complaints about departments or individuals.</li><li>Housing Need Assessment and Survey: This should provide survey space for citizens to register their housing needs in current situations.</li><li>Community Development Information System: Community Development Information System (CDIS) should serve dual purpose: a) Build Information system for all the development programs b) Rehabilitation Monitoring System (RMS) c) Division wise MIS report containing RWA formation &amp; Registration status, Matching Grants status, TNUHDB&#39;s Recognition status, Maintenance Committee formation &amp; Charges collection, Skill training status, Awareness Programme/Cleaning Camps and GRM d) Community development activities - Youth Club activities for identifying the potential talents within the scheme</li></ol><p>The basic features of the web information portal should be as follows:</p><ul><li>Should have aesthetically designed website and mobile applications, which should be highly user friendly, Search Engine Optimization (SEO) and Social Media Optimization (SMO) friendly and compatible with all the latest browsers (such as Internet Explorer, Mozilla, Google Chrome, Opera, Safari) and technologies</li><li>Content for Portal and Mobile app will be as per the inputs from TNUHDB. The content should be finalized in consultation with TNUHDB&nbsp;</li><li>Should have dynamic Content Management System for managing web portal. The targeted audience would be</li><li>Internal Stakeholders like TNUHDB Officials and Employees</li><li>External stakeholders like Citizens, Beneficiaries etc.</li><li>Mapping of the existing content, Editing, Formatting of Documents and Conversion in web pages for Tamil and English</li><li>Mapping of existing applications and selected dynamic features of the existing web portal into new design of the web portal</li><li>Delivery mechanisms for all type of contents</li><li>Hosting of web portal on user department server or on cloud</li><li>Should have at least the following information content on the web portal<ul><li>General information about TNUHDB, its mission, goals, and vision etc.</li><li>Organizations Details like, Chart, functions, Achievements over the year</li><li>Annual Reports</li><li>Links to Projects, Housing Schemes&nbsp;</li><li>Training details for Community wing</li><li>Documents or publications for Citizens</li><li>Citizen Charter and Grievance Redressal Management System</li><li>List of all Active and Archived Tenders- possible integration with e-procurement website</li><li>Contact Us</li><li>Frequently Asked Questions (FAQs)</li><li>Photo gallery</li><li>Sitemap</li><li>Hit counter</li><li>Help manual (Text and Video based) on various key functionalities of Portal&nbsp;</li><li>Important links - to websites pertaining to Government of Tamil Nadu (all Government Departments, Madras High Court)</li><li>Link to social media page of TNUHDB on various social media portals such as Facebook, Twitter, YouTube, and others if any</li><li>Option to select language (Tamil and English) to view Portal and mobile app in desired languages</li><li>Other content as specified by TNUHDB from time to time&nbsp;&nbsp;</li></ul></li><li>Should implement necessary security features against hacking and defacement</li><li>Should be comply with all the requirements as stated in &ldquo;Guidelines for Indian Govt. Websites&rdquo; (GIGW)</li><li>In addition, this web portal should ensure adherence to IndEA Framework (Agile India Enterprise Architecture</li></ul><p><strong>Employee Portal</strong></p><p>TNUHDB Intends to build a portal for all internal users of TUNHDB where they can access to their assigned task, assigned tickets, training schedule as a part of capacity building.</p><p>This portal will focus on 3 major areas which are</p><ol><li><strong>Task Dashboard:</strong></li></ol><p>This portal should have employee task dashboard which should provide list of assigned tasks and deliverables through project management system, also this portal would be integrated with grievance redressal management system and tickets will be generated and assigned to employees based on their role and responsibilities. This Task dashboard should play vital role in evaluating employee&rsquo;s performance, thus, to be integrated with HRMS module of ERP.</p><p>&nbsp;</p><ol><li><strong>Knowledge Management System (KMS):</strong></li></ol><p>The purpose of the knowledge management is to ensure that right information is available to the right person at the right time to enable informed decision making. The KMS should be integrated with the DMS, selective sections of the PMS module and HRM module for information dissemination.</p><p>KMS should be single sign on application or module that should automates the administration, tracking and reporting of access to various documentary resources</p><p>Additional Learning Management System should be part of this offering which would allow users to access all training and capacity building programs from employee portal</p><p><strong>3.MIS Dashboard</strong></p><p>This dashboard should provide vital information to manage an organization effectively. MIS reports should provide insights related to business operations such as Engineering, Administration, Finance, employee performance, Community Development wing, revenue generated, customer queries, inventory, and information on all assets that is important to the management of a business.</p><p>MIS reports should be used by many large businesses that need daily reporting</p><p><strong>Enterprise Support Applications</strong></p><p>All the process or department specific interventions work to achieve specific objective. However, the there is need of some support tools which should support the main interventions or applications in achieving their objective effectively.</p><p>These business support tools are mainly:</p><p><strong>Document Management System (DMS)</strong></p><p>As an e-Governance initiative, all the public organisations are implementing enterprise Document Management System, which intends to create an integrated platform for performing key business functions, establish a Centralized Document Repository to store and route documents electronically and reduce paper-based work to achieve Paperless Office, improve productivity and provide a unified platform for the users to transact with inter/intra department and existing or upcoming IT systems.</p><p>Key considerations for Document Management System (DMS)</p><ul><li>The Document management solution should be in line with industry standards, legal requirements and Government of India requirements as prescribed from time to time apart from conforming to the Workflow processes of Tamil Nadu Government.</li><li>It should be implemented at the enterprise level including all the offices of the TNUHDB viz. Head Office, Divisional Offices and Estate Offices.</li><li>In terms of broad architecture, DMS should be centrally hosted system running from TNUHDB&rsquo;s central repository which will be on premise or on cloud and will be available to all TNUHDB offices through its Wide Area Network (WAN).</li><li>The devised solution should meet the required performance parameters and sustain the growing requirement.</li><li>It should be capable to handle multiple languages, English and Tamil</li><li>It should have the capability for scanning and capturing of documents for bringing them in the DMS System.</li><li>It should also work seamlessly with the paper based inward system TNUHDB or should have capacity to integrated with dispatch management system (Tapal Management System)</li><li>The system should have very efficient retrieval capabilities with proper indexing, which should be easy, convenient, and quick in referencing and retrieval of any document, data, record etc.</li><li>This DMS should be tightly interfaced to the TNUHDB&rsquo;s In-house application and other platforms like ERP, Project management, Helpdesk and other major applications to meet the business requirements as also other application such as the Share Portal for single sign on etc.</li><li>Once implemented it all the metadata/ data of exiting system should be migrated to this DMS. Also, the new data to be digitized and stored on DMS for efficient use of DMS.</li><li>Key features of DMS should be audit trail, document retention control, Analytics, Document security, data extraction, workflow, and version control.</li></ul><p><strong>Content Management System</strong></p><p>An enterprise level Web Content Management System should be used to meet the need to manage the content of web portal. It should manage content including media of, landing pages, Project Pages, Document repository etc. on the web portal which needs to be added / modified / edited / deleted should be done with ease without support from technology team.</p><p>The content Management System should support following functions and should have following features:</p><ul><li>User should be able to design and incorporate blog and promotional landing pages as part of the website ecosystem.</li><li>It should provide the following security features: Audit Trail, Captcha, Login History, Problem Notification and SSL Support.</li><li>System should offer the following ease-of-use features: Spell Checker, Glossary and Preview Content before publishing, Font type and size should be uniforms across all the pages.</li><li>Admins to receive SMS/E-mail alerts immediately in case of any emergency or unauthorized access.</li><li>The CMS should create SEO-friendly URLs for each page. If pages are later moved or renamed, CMS should configure an HTTP 301 Permanent Redirect to notify search engines. Also, should have features for users to override such Automatic activities to customized settings. The proposed CMS should have built-in support for SEO like Meta tags, Canonical URLs, extension less URLs.</li><li>The CMS Should build the Sitemap.xml file automatically based the site map created in the CMS.</li><li>The CMS should have a backend with editors previewing personalized pages, which can filter by more than one segment to see how a page will display to users in multiple segments.</li><li>The CMS should have multiple site management to manage a collection of websites and microsites through a centralized interface. The Content authors should be able to easily contribute to multiple websites or utilize content from other websites. Also, CMS should be easily able to share and synchronize Users, roles, content, permissions, and templates between sites.</li><li>The CMS should have a detailed logging of all activities performed by the Backend user on the CMS and features in the Audit trail module to track changes and actions in the system. Also feature to register events such as when a page disappears because it was deleted or moved, when the content of a page is broken due to the widget having been updated, or when an image reference is broken. Also log changes in the configurations.</li><li>It should have intuitive dashboard to manage all the tasks involved in content production including scheduling content, monitoring threats, tracking user activity, installing modules and plugins, and reviewing performance analytics, social media analytics among other responsibilities.</li><li>Responsive themes for establishing a consistent look and feel across the Portal including customizable templates to manage content presentation.</li><li>Content Publishing Tool to easily create content (including Multi-language Content) using WYSIWYG editor, publish different types of content, Content organization structures, e.g., hierarchy and taxonomy, versioning, and workflow management.&nbsp;</li><li>Built-in SEO Tool to optimize content for search and improve chances of ranking.</li><li>Social media integration to schedule and publish posts on social media platform.</li><li>Permission-based access control including user and group functionality, delegation between user groups.</li></ul><p>&nbsp;</p><p><strong>GIS Mapping</strong></p><p>The GIS mapping for TNUHDB will allows users to organize, visualize and analyse different layers of data by creating maps and scenes.</p><p>With the ability to clearly visualize different types of data, users are enabled to uncover patterns, understand trends, monitor changes, and respond to events&mdash;facilitating better decision making.&nbsp;</p><ul><li>The major use of GIS could be in planning of rehabilitation or housing schemes, identification and mapping of Social Infrastructure facilities in and around the scheme boundaries, where the boundary of each slum will be marked on the GIS base map of planning area with the help of satellite image and using GPS</li><li>This mapping platform should bring all required information on a map layer and can be used for land identification, land finalization, planning and implementing projects.</li><li>Accordingly, GIS base map can be prepared which would contain:</li><li>Key physical features such as road, rivers, railways, water bodies and important landmarks.</li><li>Land use and land cover</li><li>The survey and housing need data collected from various data sources should illustrate demand by area wise. It should help in geo mapping of income groups area wise and can help plan projects or housing schemes.</li><li>This platform will connect with various in-house applications like Project management tool, Estate management module of ERP etc.</li></ul><p><strong>Business Intelligence &amp; Analytics Engine</strong></p><p>TNUHDB should implement a BI tool/ Analytics engine to generate insights from the collected data from various sources.</p><p>TNUHDB should implement a BI tool/ Analytics engine to generate insights from the collected data from various sources.</p><p>This BI engine should have following components broadly</p><p>1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Analytics and Reporting</p><ul><li>A GUI based system where all business users should be able to view/ save/ download/ schedule various enterprise metrics/ dashboards and their summary without any programming efforts</li><li>It should be capable to filter all key business metrics based on various parameters</li><li>It should be capable to pull the report for a specified performance period in a pivot table and different graphical layout</li><li>It should compare metrics across various parameters in a chart or graphical formats</li></ul><p>2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Automated Dashboards</p><ul><li><ul><li>It should produce dashboards without the help of IT team for system integration and publish it for the consumption of department users</li><li>It should enable user of making ad-hoc query through SQL commands as well as GUI based design (drag and drop) along with rich analytical functions</li></ul></li></ul><p>3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Data Management</p><ul><li>It should be compatible with different data storages like Flat file storage, relational databases and big data storages</li></ul><ul><li>Should supports on-demand processing with its own data ETL process</li><li>Functionality for admin users to create new dimensions, derived metrics etc.</li></ul><p>4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reporting Tool</p><ul><li>The Reporting tool with ability to schedule reports.</li><li>Should have robust visualizations such as graphs, charts, and histograms. Should have slicing and dicing features</li><li>It should provide output data in various formats like PDF, Images.</li><li>It should have strong data Visualization like heat maps, spark lines, geographical mapping, spider charts etc., preferably with auto charting and dashboard facilities</li><li>through the key words</li></ul><p><strong>Helpdesk Support for Users</strong></p><p>Helpdesk support application enables end users to raise and resolve trivial issues, track ticket status, and manage approvals with a self-service portal. It Provides higher end user satisfaction levels by defining appropriate SLAs and making sure that services are delivered on time, and incidents are resolved well within SLAs. Key functional requirements of IT helpdesk tool are:</p><ul><li>Creation of site-specific incident and request SLAs by users</li><li>Auto assigning of SLAs to tickets based on incoming ticket parameters</li><li>Multi-level escalations, with custom templates for response time SLA, and resolution time SLA escalations.</li><li>Reassignment of tickets to other technicians or support groups and resetting of ticket parameters like priority on SLA escalations.</li><li>Enable access control of workstations remotely through VNC (Virtual Network Computing) applications</li><li>Generate reports on all pending or completed tickets based on parameters such as department, level, mode, priority, requester, technician, category, and request date.</li><li>Monitor Support performance by generating reports on SLA compliance with real-time IT help desk dashboards.<ol><li><ol><li>Administration - User Management, Workflow management, Audit-Trail</li></ol></li></ol></li></ul><p>The Administration module should have the following features or capabilities.</p><ol><li>Should allow TNUHDB team to manage the stakeholders accounts with TNUHDB Information Portal and Digitalization system</li><li>Should allow to provide role-based access to TNUHDB staff and Portal users.</li><li>Should allow to provide access to TNUHDB Staff on portal modules including specific functions of module such as view, delete, search, download, print and others.</li><li>Should allow external stakeholders to register with TNUHDB employee portal</li><li>Should allow to perform the functions like add, edit, delete, block, unblock, reset password and other related operations for user accounts of TNUHDB staff and users registered with TNUHDB employee Portal</li><li>Shall support the creation of workflows which shall be implemented using an automated workflow management system</li><li>Should support creation of secondary workflows as well, which would be fully integrated with the primary workflows</li><li>Should be able to support/configure complete workflow required for successful coverage of various processes of TNUHDB departments related to this project</li><li>Should allow designing of workflow with the ability to define business rules, process flows, alerts, and triggers without programming</li><li>Should automatically raise alerts, messaging, notifications, emails etc. across functional areas/ modules and concerned stakeholders based on the various timelines assigned for tasks or if an attempt is made to amend the entries already entered in the system</li><li>Should allow authorized user to configure the workflow as per the guidelines of the department for handling the processes successfully. The workflow management/ control should provide consistent method of defining business rules, process flows for all TNUHDB offices and concerned stakeholders</li><li>Mandatory approval should be uploaded in the application prior to making any changes in the workflow. Audit trail of the modifications should be maintained in the system</li><li>Should have a maker-checker workflow for peer approval for created stakeholder accounts, updating in scheme information sharing request made by board Members and other modules for which the workflow would be required</li><li>Should capture the portal user activities like login &amp; logout time, portal module accessed, search keywords, documents downloaded &amp; printed, information requested and other functionalities</li><li>Should generate various audit-trail report with drill down information, for the portal user activities</li><li>Should send notifications (through E-mail and/or SMS) to Portal Administrator upon attempting to perform above mentioned functions by TNUHDB Staff</li><li>Other related requirements specify by TNUHDB team<ol><li><ol><li>Mobile application</li></ol></li></ol></li></ol><p>SI to develop mobile version (lite version) of the TNUHDB web Portal with specific functionalities which can be accessed using smart phone/tablets. The Mobile application are to be developed for TNUHDB internal and external stakeholders including TNUHDB Officials, Citizens, beneficiaries, RWA&rsquo;s and applicants.</p><p>While the detailed functionalities will be finalized during the SRS stage, the indicative high-level functionalities for Lite version are as provided below:</p><ol><li>TNUHDB Information Portal home page with user management features</li><li>Allows the portal user to search, view, download the desired information online including housing schemes GR, announcements, and scheme details</li><li>Allows the applicant user to fill up online applications</li><li>Allows the applicant to track the status of their applications</li><li>Allows the raise grievance and complaint about services being offered by TNUHDB</li><li>Allows the beneficiaries to raise and track maintenance request for their tenements &nbsp;</li><li>Allows the TNUHDB officials to view the dashboard and reports</li><li>Allows the Beneficiaries to pay maintenance and other payments needed to be paid to TNUHDB via Online and to be linked with RWA&#39;s with the status monitoring of Income and Expenditure details of RWA&rsquo;s</li><li>Allows the portal user to share their feedback, grievance on portal</li><li>Other required functionalities such as RWA Module with features such as - Rules &amp; Regulation, Database on the RWA formed and their renewal period, matching grant issued and regular payee, defaulters of maintenance fees, announcements related to activities such as Skill development, Job Training, etc&hellip;</li></ol><p><strong>Technical requirements</strong></p><p>Technical specifications provided here are the set of requirements that the Digitalization solutions including TNUHDB web Portal &amp; Mobile Application of TNUHDB must meet. This document provides information to the SI on the business requirements, various standards and guidelines and is an essential guide for defining a proposed system and ensuring mutual understanding among key stakeholders.</p><p>All the technical specifications provided in this section are minimum and have been provided for immediate reference only.</p><p>All the software (if any) along with proposed solutions shall initially be supplied with minimum on-site OEM comprehensive warranty/ support from the date of Go-live till the entire contract period. Also, if the contract period is extended, then SI must ensure that all the supplied software&rsquo;s OEM warranty, service and support, licenses should be till perpetuity and for unlimited users. Please find below the summary of the software component for which the license would be required.</p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:28.05pt; width:25.3pt\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; height:28.05pt; width:225.75pt\"><p><strong>Software component</strong></p></td><td style=\"background-color:#4472c4; height:28.05pt; width:102.2pt\"><p><strong>Type of license / Licensing period</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:28.05pt; width:89.2pt\"><p><strong>Number of licenses</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:16.25pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:225.75pt\"><p>Integrated Project Management System</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:28.05pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:28.05pt; vertical-align:top; width:225.75pt\"><p>ERP System- Human Resource Management System Module</p></td><td style=\"height:28.05pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:28.05pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.05pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:225.75pt\"><p>ERP System- Finance and Account Management Module</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:17.15pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:17.15pt; vertical-align:top; width:225.75pt\"><p>ERP System- Office Administration Module</p></td><td style=\"height:17.15pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:17.15pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:16.25pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:225.75pt\"><p>ERP System- Estate Management Module</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:16.25pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Citizen Web Portal</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>Citizen Mobile Application</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Employee Web Portal</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.05pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:225.75pt\"><p>Smart Module- Water, Energy &amp; Video Management and Remote Monitoring</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.05pt; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Helpdesk Application</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Subscription</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>Web Content Management System</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"border-color:#8eaadb; height:16.25pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:16.25pt; vertical-align:top; width:225.75pt\"><p>Documents Management System</p></td><td style=\"height:16.25pt; vertical-align:top; width:102.2pt\"><p>Perpetual&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"height:16.25pt; vertical-align:top; width:89.2pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:17.15pt; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:225.75pt\"><p>GIS Software &amp; base Map</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:102.2pt\"><p>Subscription</p></td><td style=\"background-color:#d9e2f3; height:17.15pt; width:89.2pt\"><p>At actual</p></td></tr><tr><td style=\"border-color:#8eaadb; height:15.35pt; vertical-align:top; width:25.3pt\"><ol><li>&nbsp;</li></ol></td><td style=\"height:15.35pt; vertical-align:top; width:225.75pt\"><p>BI &amp; Analytics Platform</p></td><td style=\"height:15.35pt; vertical-align:top; width:102.2pt\"><p>Subscription&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"height:15.35pt; vertical-align:top; width:89.2pt\"><p>At actual</p></td></tr></tbody></table><p>&nbsp;</p><ol><li><ol><li><ol><li>Design, Develop and Implement the TNUHDB Information Portal</li></ol></li></ol></li><li>Application must be web based, built on enterprise application platforms, use multi-tier/ N tier application architecture with sufficient flexibility for customization based on TNUHDB requirements.</li><li>The Application should be built on enterprise application platform with flexibility to implements desired Modules / Functionality and should have Multiple User Access modes like GUI, Web, Portal etc.</li><li>The project management system and ERP application shall have inbuilt automated workflow management system, document management system</li><li>The application shall be integrated with all the required third-party services.</li><li>The application shall support all popular/ common web browsers i.e., Google Chrome, Mozilla Firefox, Internet Explorer, Microsoft Edge and Safari.</li><li>The application home page should at least have the following.<ol><li>Homepage should be attractive and well-constructed, so that it makes a good first impression to all who visit the site</li><li>Key topic areas should be presented in order of importance and should be easy to read.</li><li>Homepage should clearly communicate the site&#39;s purpose and show all major options available on the Web site.</li><li>Most of the homepage should be visible above the fold,  and should contain a limited amount of prose text.</li><li>Easy access to the homepage should be provided from every page in the site.</li></ol></li><li>The application layout should at least have the following.</li></ol><ol><li>All items should be appropriately aligned on the pages and layout should be consistent on all the related pages.</li><li>Style &amp; colour scheme should be consistent across the site</li></ol><ol><li>The navigation on the application page should at least have the following.</li></ol><ol><li>A Web Portal navigation scheme and features should allow users to find and access information effectively and efficiently</li><li>Navigation tabs should be located at the top of the page, and look like clickable versions of real-world tabs</li><li>The navigation elements should be clearly differentiated from each another and should be placed in a consistent way so that it can be easily located on each page</li><li>Site maps should be available with all the links of pages existing on the website and link for the site map should be clearly visible on the homepage</li></ol><ol><li>The application Heading, Titles &amp; Labels should at least have the following.</li></ol><ol><li>Headings should be used in their appropriate HTML order and heading levels should not be skipped</li><li>All pages should have category labels including links and clearly reflect the information contained within the category</li></ol><ol><li>The SI must deploy a software development methodology that ensures rapid deployment of the applications in such a way that the users are continually involved in the development process, and minimum iterations are required before the final Go-live of the integrated solution.</li><li>From the integration perspective, the SI must consider necessary interfacing requirements (both at the application and data level). Appropriate interfaces must be provided for seamless integration. Such interfaces shall follow industry standards such as web services. If such a need arises, the SI shall be responsible for creating such a required web service or API, etc. for the same. This includes, but not limited to, the integration with the TNUHDB Department Applications or any other external Departments.</li><li>Should be operational for the next 20-25 years and the changes and advances in the field of information and technology should be able to be incorporated in the system. If necessary, adapt to the new technologies and upgrade the system accordingly. It should be possible to use all the data in the system by transferring it properly in the new environment<ol><li><ol><li>Design and Development of Mobile Application</li></ol></li></ol></li></ol><ol><li>The mobile application shall also be available on Mobile for both Android and iOS platform</li><li>The mobile application should work flawlessly across different platforms</li><li>The mobile application should be user friendly and shall have modern UI/UX and feel.</li><li>The mobile application should provide on screen tips and online help to aid users while interacting with it.</li><li>There should be minimum use flash contents so that home page should be loaded quickly</li><li>It should not occupy excess client&rsquo;s Mobile RAM</li><li>Design should not be font dependent. The content of the site should be readable with default standard fonts.</li><li>The mobile application should be responsive so that it should adjust as per the screen size. Thus, design should be compatible with tablet, mobile phone and other handheld devices.</li><li>The mobile application should enable ease of configuration.</li><li>Should provide Role Based Access control</li><li>Should be able to capture and track all events at device and console.</li><li>Should come with mobile threat prevention and recovery system</li><li>Should support authentication using digital signatures</li><li>Should have facility to download and upload files</li><li>Incorporate analytics into mobile app, to track and identify users experience and actions.</li><li>Apps should be easily customizable and easy to Administer data in the TNUHDB Information Portal and Digitalization system database</li><li>Network level security, traffic should be encrypted using secured connectivity</li><li>Should support real time information via GPS availability</li><li>Should structure overall content with proper tagging to make them screen reader friendly.</li><li>Mobile Application should cater all the functionalities specifically mentioned for Mobile application in FRS.</li><li>Should be operational for the next 20-25 years and the changes and advances in the field of information and technology should be able to be incorporated in the system. If necessary, adapt to the new technologies and upgrade the system accordingly. It should be possible to use all the data in the system by transferring it properly in the new environment<ol><li><ol><li>System Architecture</li></ol></li></ol></li></ol><ol><li>The System shall be designed, implemented, and deployed by considering the scalability, reliability, security, business continuity, optimum performance of the entire solution and based on the requirements of TNUHDB.</li><li>The system architecture needs to be designed in a manner that will be based on loosely coupled components making it easy to extend.</li><li>The solution architecture designed should have seamless integration among all the components of the envisaged solution and should be designed as per industry standards and best practices. The solution design shall include, but shall not be limited to,</li></ol><ol><li>the design of the application architecture,</li><li>user interface,</li><li>database structures,</li><li>security architecture,</li><li>network architecture,</li><li>service-oriented architecture (SOA)</li><li>deployment architecture,</li><li>Unified Modeling Language (UML) diagrams,</li><li>User Interface (UI),</li><li>database schema</li><li>role-based user access management system and configure authentication-based access for various users of the system.</li></ol><ol><li>The system design must be such that the developed solution is technology neutral and can be deployed and hosted at Cloud platform (MeitY empaneled Cloud Service Providers (CSPs))</li><li>All the modules/ components of the proposed applications should be deployed in centralized manner/ platform.</li><li>The architecture should be highly scalable and capable of delivering high-performance as and when transaction volume increases. It is required that application and deployment architecture should provide the flexibility of Scaling-up (vertical scaling) and Scaling-out (horizontal scaling) on Application and Web Servers, Database Servers, and all other solution components.</li><li>The system should support clustering and high availability.</li><li>The system should allow addition of more modules/ sub-modules and more users without affecting the performance of overall application/ other functioning modules.</li><li>The system should support customization to meet the project requirements. In case need for customization arises, the same should be done in the form of add-ons and routines/ patches that can be plugged/ unplugged from the base software package as the situation arises.</li><li>The system should provide facility for &#39;single point data entry at source&#39; and fully integrated, unified, and interfaced so that there are no redundancies. It should have the ability to have an update occur in one module and be immediately available to all other modules of the system even among geographically dispersed sites.</li><li>The system should have real-time data update among modules.</li><li>The system should be supported by 2022/2023 latest versions of all popular web browsers such as Internet Explorer (IE), Microsoft Edge, Mozilla, Google Chrome, Opera, Safari, etc. for common desktop and mobile, smart phones and tablets.</li><li>The system design must be such that requires minimal installation, if at all, at the user&rsquo;s end, besides the Internet Browser (except where offline desktop/mobile apps are to be mandated).</li><li>The system should in compliance with website and accessibility standards such as GIGW and others.</li><li>The SI shall ensure consultation with TNUHDB officials for finalizing of design components including the UI, the mode of data entry, storage and retrieval, MIS reports, queries, the application design, and others as applicable.</li><li>The system design should have a data integration strategy for integrating internal and external data sources (if any)</li></ol><p>&nbsp;</p><p>The solution architecture should be designed by SI in line with the requirements provided in RFP document.</p><ol><li>As specified above, the application should have multiple layers as described below:<ol><li><strong>Presentation Layer:</strong> This layer should be web-enabled and should run on all major web browsers. This layer interfaces the business components and implements automated data workflows for GUI initialization, loading, saving data, enabling, and disabling forms. Multi-language support is also implemented at this layer which allows runtime modification of terms and phrases.</li><li><strong>Service layer:</strong> This layer contains a class library which takes care of inter-operability and open standard/ protocols like web service, windows services, APIs, which make this Business Layer a platform independent. This layer is used to give functionality for data exchange using web services-based component or database synchronization with external agency.</li><li><strong>Business layer:</strong> This layer should implement the process flow and logic that drives the business functionality. Framework should have provision to keep all the user activity to be audited and logged during the business process.</li><li><strong>Persistence layer:</strong> It has been visualized that the application for this project would be managing very high volume of data, storing a large amount of data for long-term preservation of records at various repositories. It is mandatory for the SI to ensure faster access and better manageability of this data. It is expected that the SI shall consider mechanisms which would improve the performance of this layer.</li><li><strong>Data layer:</strong> Data layer will have Data Access class library which provides methods for exchanging data between business components/ layer and databases/ persistence layer.<ol><li>Internet and Intranet Enabled</li></ol></li></ol></li></ol><ol><li>The TNUHDB Information Portal should support access via LAN, WAN, and Internet with secured connectivity.</li><li>The system should be scalable and flexible enough to provide access and information to all the users from the different functions/ departments/ offices of TNUHDB and other key stakeholders.</li><li>The system should support all TCP/ IP/ SMTP/ or any other related protocols.<ol><li><ol><li>Graphical User Interface</li></ol></li></ol></li></ol><ol><li>The system should be user friendly and should have interactive Graphical User Interface (GUI).</li><li>All the application modules and sub-modules shall use uniform theme in the GUI. The application should be consistent in the sequences in the visual presentation to the user and in use.</li><li>The system should have sufficient validation checks at GUI/ presentation layer for validating the data formats, completeness of the forms in terms of mandatory fields, checking for file type and size of files uploaded etc.</li><li>Online forms should have mandatory fields marked out clearly. The system should not allow submission of the form without completing the mandatory fields.</li><li>The system shall support uploading of scanned documents. There must be check(s) for ensuring the upload of all the mandatory documents.</li><li>It should have provision for warning and alert messages in case of validation failure, incomplete data etc.</li><li>It should have facility to display confirmation/ warning windows for deletes changes etc.</li><li>The system should have responsive themes for establishing a consistent look and feel across the Portal including customizable templates to manage content presentation.</li><li>The system should provide consistent screen layouts and access methods across all modules so that they look and behave the same.</li><li>The system should provide various reports/ MIS in graphical and tabular views along with facility to drill down to navigate to the next levels of details and so on.</li><li>The/ user interface shall give flexibility to toggle between graphical and tabular views, and tile different views in the same interface.</li><li>User specific/ customized dashboard should allow authorized user to act on pending activities in a secured manner in a system seamlessly integrated with other modules of the application. Submission of every activity in the system should suitably update database on real-time basis.<ol><li><ol><li>Workflow Integration Approach</li></ol></li></ol></li></ol><ol><li>The application shall support the creation of workflows which shall be implemented using an automated workflow management system.</li><li>The application should support creation of secondary workflows as well, which would be fully integrated with the primary workflows.</li><li>The application should be able to support/ configure complete workflow required for successful coverage of various processes of TNUHDB. It should allow designing of workflow with the ability to define business rules, process flows, alerts, and triggers without programming.</li><li>The application should automatically raise alerts, messaging, notifications, emails etc. across functional areas/ modules and concerned stakeholders based on the various timelines assigned for tasks or if an attempt is made to amend the entries already entered in the system.</li><li>Mandatory approval should be uploaded in the application prior to making any changes in the workflow. Audit trail of the modifications should be maintained in the system.</li><li>The application should allow devising of simple or complex rules to suit TNUHDB requirements and the requirements specific to certain stakeholder(s). The rules should be stored in a central repository and the same must be shared across all business processes.</li></ol><p><strong>Integration</strong></p><ol><li>The system should be designed to ensure that current and new applications can be seamlessly integrated (through an application integration solution) within its architecture with minimal impact and changes.</li><li>The system should be fully integrated across modules and functional areas.</li><li>Identify the data/ services which is to be exchanged between the application and other internal/ external systems.</li><li>Identify integration touch points for ensuring seamless integration with these internal/ external systems and TNUHDB application.</li><li>The application should support integration with the following (but not limited to) application/ systems:</li></ol><ol><li><strong>Gateway: </strong>The application should employ the following gateways through API integration:<ol><li><ol><li><u>API Gateways:</u> An API gateway to bring applications together to perform a designed function built around sharing data and executing pre-defined processes. It should work as intermediate application to build new programmatic interactions between the various applications people and businesses use daily.&nbsp;</li><li><u>Web Gateway:</u> A web gateway to allow exchange of messages with other computer systems using the standard Hyper Text Transfer Protocol. The application shall utilize a web gateway to allow users to access the application using browsers.</li><li><u>Mail Gateway:</u> The application should provide the user to send and receive formal communication, confirmation, status, alerts, messages, reminders, notifications etc. via email. SMTP server should be implemented to push system generated emails to users and receive the email from Help module of the TNUHDB Information Portal.</li><li><u>SMS Gateway:</u> The application should be integrated with SMS gateway for sending confirmations, status, alerts, reminders, notifications, messages etc. via SMS. The application shall utilize a SMS gateway to send SMS notifications such as application status, demand dues, scheme information etc.</li></ol></li></ol></li><li><strong>Other Integration:</strong> The application should be integrated with the following external systems to access respective functions for sending and receiving desired/required data.<ol><li><ol><li><u>TNUHDB applications:</u> The respective TNUHDB existing applications such as Member Information System will be integrated to fetch information of scheme and display the same on TNUHDB Information portal.</li><li><u>Social media portals:</u> The social media portals such as Instagram, Koo, Facebook, Twitter, YouTube of TNUHDB should be linked from TNUHDB portal to navigate to these social media portals.</li><li><u>Tamil Nadu General Administration Portal (For GR):</u> The Government Resolution (GR) section under Tamil Nadu Government website www.tn.gov.in should be linked to or make a provision to upload respective GR for linking it to respective subject under GR.</li><li><u>Supreme Court &amp; High Court systems:</u> The respective applications (e.g. sci.gov.in / ecourts.gov.in / https://www.hcmadras.tn.nic.in ) for Supreme Court and High Court should be linked for the details of respective Court ruling to link it to respective subject under TNUHDB.</li><li><u>Other systems:</u> The other system which may be identified during the implementation of TNUHDB Information portal shall be linked to fetch required data/information.</li></ol></li></ol></li><li><strong>Digital certificate services</strong>: The application should be DSC enabled.<ol><li><ol><li>Installation/ Upgrade/ Enhancement</li></ol></li></ol></li></ol><ol><li>The system should facilitate seamless upgrades (deployment of patches/ new version) without any adverse impact on the system and its components.</li><li>The SI should provide notification and patches for system enhancements and fixes to the application after implementation on a proactive basis.</li><li>The system should have facility to maintain versions with changes/ modifications made in each release.</li><li>The SI shall ensure that future upgrades, enhancements, and bug fixes are not impacted. Every custom development must be documented in detail and the code/script should be properly annotated with comments.<ol><li><ol><li><em>Scalability</em></li></ol></li></ol></li></ol><ol><li>The system should be scalable to handle the peak load coming from different types of users i.e., Internal and External Users, and should support high volume of data upload, without compromising response time or efficiency of the system.</li><li>A load balancer should be deployed to optimize resource use, maximize throughput, minimize response time, and avoid overload of any single resource.</li><li>Scalability of the solution is to be achieved at least along the Dimensions described below:<ol><li>Scalability in terms of the volumes of transactions handled: This translates to the facility to enhance the hardware, software, and network capacities to maintain the performance levels always in tune with the SLA metrics.</li><li>The system should allow addition of more users as and when required, without affecting the performance of overall application/ other functioning modules.</li><li>Scalability in terms of addition of new services of an existing department: This translates to seamless and effortless integration with the backend application such that new services can be added and deployed with relative ease.</li><li>Scalability in terms of addition of new departments: This translates to seamless integration with heterogeneous systems at the backend with relative ease of deployment of the applications and services, maintaining the common look and feel and functionality at the front-end.</li><li>The system should allow addition of more modules/ sub-modules without affecting the performance of overall application/ other functioning modules.</li><li>Scalability in terms of addition of new channels of delivery: This translates to designing the systems suitably to provide services through other delivery channels like the mobile devices and other devices.<ol><li>Security</li></ol></li></ol></li></ol><ol><li>The system should provide well-designed identity and privileged access management system, security of digital assets, data, network security, backup, and recovery/ disaster recovery system.</li><li>The system should be free from OWASP (Open Web Application Security Project) Vulnerabilities</li><li>Captcha to be implemented to prevent password cracking tools.</li><li>Secure mechanism of changing the password in lost/forgotten scenario for the authorized administrators.</li><li>The system must have proper security and maintenance facility with access control features for controlling the access rights over the system and over the various functions/ features available for different types of users.</li><li>Website/portal should be able to generate mail Alert and historical report in the security report viewable to the administrator containing the Time, IP address of attackers, the page under attack, and the parameter under attack with the attack values.</li><li>There should be a provision of blocking any IP or Network by assigning IP Address range from accessing the pages of admin module of the website/portal; also, the main website. So that identified attackers can be blocked.</li><li>The admin module, uploader module should be in separate folder so that HTTPS can be configured on the functionality that requires login action to be done.</li><li>Unauthorized access should be restricted and only authorized users with valid login-ID and password should be allowed to access the legitimate features i.e., access to data file, module, screen, data table, record, field, etc. If required, second level password may be provided for accessing certain features/ screens/ transactions.</li><li>To maintain information security during transaction the developed system should support both HTTP and HTTPS, all internal data communication shall be done through encrypted mode using latest version of TLS (Transport Layer Security)/ SSL (Secure Socket Layer).</li><li>The system should have a capability to assign activities to roles, and map roles to users and provide role-based access to users.</li><li>Although most of the information in the system will be available for public, but certain information will only be restricted to certain departments and officials of TNUHDB. Appropriate role-based security should be provided so as to who will and how will they have the right to view and handle the limited information about the digitized documents. Should give specific rights to TNUHDB officers or employees in each position to manage access right to such information. If anyone handles a File / document in the system, notice should go to the superior officer of that post/department and the system should also generate information about which File / document has been viewed or downloaded by any officer / employee and its daily / weekly report will be received by the senior officer of the concerned TNUHDB department. User ID and password related to officer / employee will be linked to their official mobile number (as per information in the official records). While searching for limited information (which is not available to everyone) in the system, the OTP (One Time Password) based security arrangements should be made in the proposed solution (including web and mobile application) so that the relevant documents / files can be viewed only after getting authenticated with OTP.</li><li>The system should notify security/ system administrator regarding unauthorized access or attempt to access and record in a log with reporting mechanism.</li><li>The system should have the feature of automatic log-off if there is no user activity for specified time.</li><li>The application should have sufficient validation checks at GUI/ presentation layer for validating the data formats.</li><li>The application should provide safeguards to prevent damage to data from user errors, simultaneous updates, module unavailability or system failures.</li><li>The system data must be kept on storage media with high tolerance of failure/ accident/ natural calamity.</li><li>The application must have integrated security/ monitoring features with the following:<ol><li>Definition of roles and users</li></ol></li></ol><ol><li><ol><li>Define role-wise add/ edit/ view/ delete rights for each entry form/ report in all modules</li><li>Digital time and user stamping of each transaction</li><li>Online monitoring of the user activities using user activity logs</li></ol></li><li><strong>Anti-Virus and Anti-Spam Services:</strong> Anti-Virus and Anti-Spam shall be deployed to keep the servers and application secure from the attack of virus, spyware, Trojans, and spam. This shall also act as a centralized system for updating the virus definitions on the systems across offices of TNUHDB.</li><li><strong>Virtual Firewall:</strong> Instance Level and Subnet Level and Web Application Firewall:</li></ol><ol><li>System shall have capability to protect network subnets with access controls that provides an optional layer of security that provides a stateless firewall for controlling traffic in and out of a subnet.</li><li>System shall have capability to segregate public subnet and private subnet.</li><li>System shall have capability to configure route tables that define which subnets can route external traffic over backend VPN or site-site connections, VPC peering connections, Internet connections, or even specific virtual machine instances.</li><li>System shall prevent packet sniffing: Virtual instances should be designed to prevent other instances running in promiscuous mode to receive or &ldquo;sniff&rdquo; traffic that is intended for a different virtual instance. Even if tenants configure interfaces into promiscuous mode, the hypervisor should not deliver any traffic to them that is not addressed to them.</li><li>System shall prevent IP Spoofing: The DC and Cloud DR service should not permit an instance to send traffic with a source IP or MAC address other than its own.</li></ol><ol><li><strong>Anti-Malware / HIPS (Host Intrusion Prevention System) and NIPS (Network Intrusion Prevention System):</strong></li></ol><ol><li>Firewall with Intrusion Prevention System shall be configured and deployed to stop intrusion and other threats coming from the network before it enters the system.</li><li>The solution shall be able to deliver Antimalware, Firewall, HIPS, Integrity Monitoring features, Log Inspection and Application control through an agent.</li><li>System should be capable of performing recommendations scan and able to monitor critical OS and application elements (files, directories, and registry keys) to detect suspicious behaviour, such as modifications, or changes in ownership or permissions.</li><li>The solution should deliver virtual patching updates and HIPS should work in detect only mode and prevent mode.</li><li>Solution should support creation of custom packet inspection rule, protect against fragmented attacks, and should allow to block based on thresholds. Packet Inspection should protect operating systems and web applications etc. against attacks such as SQL injections and cross-site scripting.</li><li>Detailed events data to provide valuable information, including the source of the attack, the time, and what the potential intruder was attempting to exploit, shall be logged.</li><li>Solution should provide vulnerability scanning to automate provisioning and de-provisioning of HIPS rules and should provide recommendation scanning against existing vulnerabilities.</li><li>Solution should support virtual patching both known and unknown vulnerabilities and Virtual Patching should be achieved by using a high-performance packet inspection.</li><li>Firewall rules should filter traffic based on source and destination IP address, port, MAC address, etc. and should detect reconnaissance activities such as port scans, Computer OS fingerprinting, SYNFIN SCAN, XMAS Scan etc.</li></ol><ol><li><strong>DDoS Protection:</strong> Managed DDoS protection service that defends against most common, frequently occurring network and transport layer DDoS attacks that target web site or applications. When used with Content Delivery Network and global DNS service, should provide comprehensive availability protection against all known infrastructure (Layer 3 and 4) attacks. Should provide always-on detection and automatic inline mitigations, minimize application downtime and latency.</li><li><strong>Identity and Access Management:</strong> Securely control users&#39; access to DC and Cloud DR services using a range of security credentials including passwords and key pairs. Create and manage users and groups, and grant or deny access to compute, storage and network. A dedicated Privilege access management tool shall be part of proposed data security solution for the purpose of privilege access management, password management, session management &amp; Log management.</li><li><strong>Managed Threat Detection Service:</strong> Continuously monitor for malicious or unauthorized behaviour to help you protect your accounts and workloads. It should monitor for activity such as unusual API calls or potentially unauthorized deployments that indicate a possible account compromise. The service should also detect potentially compromised instances or reconnaissance by attackers.</li><li>There should be 3 levels of Security Considerations as described below:<ol><li>Application Level Security:<ol><li>User authentication</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>User authorization i.e., role-based access to services, transactions, and data</li><li>Digital Certificate to be used for signing the documents</li><li>Secure storage of user credentials</li><li>Comprehensive logging and audit trail of sessions and transactions</li></ol></li><li>Network/ Transport Level Security:<ol><li>Network Link Encryption (IPSEC)</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>Encrypted HTTP session using SSL (HTTPS)</li></ol></li><li>Server Level Security:<ol><li>Firewall to filter unauthorized sessions/traffic</li></ol></li></ol></li></ol><ol><li><ol><li><ol><li>Intrusion Prevention System to detect/ prevent unauthorized activities/ sessions</li><li>Server &ndash;to-server communication encryption</li><li>Secured/ encrypted storage of data/ data elements in Database and DB Backups</li></ol></li></ol></li><li><strong>Two Factor Authentication</strong><ol><li>The solution (mobile and web) should support the Two Factor Authentication both OTP (One Time Password)/soft tokens and PKI authentication technologies.</li><li>The solution should have the capability to be deployed in such a way that the user&rsquo;s login experience should remain unchanged &ndash; there should be no user training required.</li><li>The solution should prevent against all Man-in-the-Middle including advanced phishing, pharming, Man-in-the-Browser, Key logger, and Mouse click logger attacks.</li><li>For the hardware/software token management system, all activities at admin console should have an audit trail of all logons attempts and operations. Confidential logs should be tampering proof. The tools should be provided to check the integrity of logs.</li><li>The solution should not store user credentials in any form at the server like passwords, hash of passwords, any pre shared secret etc. In other words, there should be only copy of the user credential which should reside only with the user.<ol><li>System Control and Audit</li></ol></li></ol></li></ol><ol><li>The system should maintain all the instances, audit trails, audit logs and transaction logs (what, when, who has changed).</li><li>The application shall log all the actions done by individual users with username, date time stamp and the administrator shall be able to generate detailed audit logs and history of the process instance.</li><li>It should enable availability of user wise online audit trails/ logs which should be archived based on user, date, time etc. as part of audit records keeping.</li><li>All the edited and deleted (if any) records should be traceable and copy of all records should be kept in the system and which should be available with MIS reporting of the same.<ol><li><ol><li>Data Backup/ Data Archival/ Restore</li></ol></li></ol></li></ol><ol><li>The SI shall prepare a business continuity plan for ensuring uninterrupted services of the solution. In case of server failure, system should support auto-switching of failover to another available/ backup server.</li><li>The system should be able to archive data, based on user specified parameters (i.e., date range) and restore archival data for online use whenever required.</li><li>Backup and recovery of all the system software, application software, database, etc. as per GoI policy (Guidelines for Government Departments for Adoption/ Procurement of Cloud Services).</li><li>The system should provide features to schedule backup/ restore operations. The SI should ensure that activity such as proper Data Backup, Data Restoration, and Data Synchronization at Disaster Recovery site are tested and implemented properly as per the standard norms.</li><li>The system should produce a report for each backup/ restore activity.</li><li>The system should support direct backup of data from one machine to another/ from server to back tapes/ CDs/ Storage Area Network etc.</li><li>The system should have provision to keep data on storage media with high tolerance of failure.</li><li>The system should allow recovery of data in case of hardware/ software failure and data corruption. It should be able to perform recovery to a point of time, to known backup database.</li><li>For backup data, highly available durable Storage shall be offered with minimum two copies of the data in the Primary Site.&nbsp;</li><li>System shall offer users the ability to increase the size of an existing block storage volume without having to provision a new volume and copy/move the data.</li><li>System shall support complete eradication of data such that it is no longer readable or accessible by unauthorized users and/or third parties.</li><li>System shall offer server-side encryption of data &lsquo;at-rest&rsquo;, i.e., data stored on volumes and snapshots.</li><li>The SI shall prepare a data archival, retention, disposal, and backup policy in consultation with TNUHDB officials.<ol><li><ol><li>Database</li></ol></li></ol></li></ol><ol><li>The database technology should adhere to ANSI standards.</li><li>Database should be able to compress structured data and unstructured data such as documents, images, and multimedia.&nbsp;</li><li>Database should support data mining techniques and allow seamless integration with a Digitalized data warehouse. The data mining techniques like classification, clustering, regression, and association rule learning should be supported by the database to support data mining applications developed in the application layer.</li><li>Database should support continuous Log replication between primary node and secondary node in Synchronous or Asynchronous mode.</li><li>The solution should use appropriate storage options for storing unstructured data such as documents, images, and multimedia instead of storing it in NoSQL system.</li><li>Database should provide high availability and disaster recovery using cost effective option of automatically synchronizing the transaction logs to disaster site, which in case of fail over the other node provides the availability of all data.</li><li>The solution should provide controls for database security and monitoring.</li><li>The solution should have database health monitoring components which can ensure application availability and performance.</li><li>The SI while implementing a data base solution, shall carry out all the related tasks, including the following:<ol><li>Design and develop the data model to fulfil the functional requirements of TNUHDB and provide a comprehensive view of the entire digitalized records and other materials of TNUHDB departments.</li></ol></li></ol><ol><li><ol><li>Ensure the data integrity &amp; consistency is always maintained.</li><li>Ensure storage of documents and images</li></ol></li><li>Robustness: Should assure high availability of data with regular backup</li></ol><p>&nbsp;</p><ol><li><ol><li><ol><li>Enterprise Monitoring System (EMS)</li></ol></li></ol></li><li>SI shall supply, deploy &amp; configure EMS tools to TNUHDB for Project Management &amp; Monitoring during implementation and operation &amp; maintenance period</li><li>SI shall be responsible for providing tools, in line with industry standards for Evaluation and SLA Monitoring during O&amp;M period. Such tools should be capable of monitoring the performance of the SI &amp; provide automated consolidated SLA reports for all the SLAs as mentioned in this RFP including real time status of various service levels achieved</li><li>SI should make available the SLA report through a centralized web access / dashboard the access for this to be given to at least 5 users of TNUHDB. The dashboards to be made for two levels (Principal Secretary / Secretary level as well as operational dashboard) for TNUHDB MIS team</li><li>The implemented EMS solution to help TNUHDB in data driven decision making. Once the tool is implemented the SI shall also get the implementation certified from the respective OEM confirming that the tool has been correctly implemented. SI shall also provide 2 days in-depth training to at least 20 users of TNUHDB on usage and operations of EMS solution</li><li>The EMS should be able to support the proposed hardware and software components at Cloud DC and DR over the tenure of the contract. The system should be capable of providing early warning signals to TNUHDB on the solution performance issues, and future infrastructure capacity augmentation.</li><li>SI is expected to provide and implement the EMS encompassing the following functions:<ol><li>Configuration Management</li><li>Fault Management</li><li>Incident, Problem and Change Management</li><li>Asset Management</li><li>Remote Control</li><li>SLA management and monitoring</li><li>Performance management</li><li>Monitoring Backup and Management</li><li>Event Management</li><li>Server, storage, and other infrastructure management</li><li>Network Link Monitoring</li><li>Other modules as required by SI to meet the requirements of this RFP</li></ol></li><li>Also, the new system should be extended to any new device which shall be added in future to fulfil the project requirements.</li><li>SI shall also provide the Login of EMS to TNUHDB, so that key members of the Project Management Committee (PMC) can monitor the SLA compliances.</li></ol><p>Application Performance Monitoring</p><ol><li>The proposed solution must be able to perform infrastructure aware application triage, i.e., pinpoint network issues causing application degradation.</li><li>The proposed solution must determine if the root cause of performance issues is inside the monitored application, in connected back-end systems or at the network layer from a single console view</li><li>The proposed solution must proactively monitor 100% of real user transactions; detect failed transactions; gather evidence necessary for triage and diagnosis of problems that affect user experiences and prevent completion of critical business processes</li><li>The proposed solution must provide complete end-to-end transaction visibility by monitoring at a transactional level and without deploying any software at end user desktop.</li><li>The proposed solution must provide a single view that shows entire end-to-end real user transaction and breaks down times spent within the application components, SQL statements, backend systems and external 3rd party systems</li><li>The proposed solution must be able to provide root-cause probability graphs for performance problems showing the most probable root-cause area within application infrastructure.</li><li>The proposed solution must provide a real-time application topology map to triage and quickly pinpoint the component causing a performance bottleneck in the end-to-end transaction flow.</li><li>The proposed solution must gather available performance indicator metrics from all within real-time production environments and real user transactions 24x7 with minimal overhead on monitored applications without sampling.</li><li>The proposed solution must provide for easy dynamic instrumentation of application code, i.e., be able to enhance out of the box monitoring with extra monitoring definitions without having to restart application or JVM/ .NET Worker Process.</li><li>The proposed solution must be able to detect production Memory Leaks from mishandled Java Collections and Sets and isolate exact component creating leaking Collection or Set (or .NET Memory Leaks within the CLR).</li><li>The proposed solution must allow monitoring granularity of no more than 15 seconds for all transactions.</li><li>The proposed solution must report of response times of Java/.Net methods based on simple method parameters (Strings, Integers etc.).</li><li>The proposed solution must provide real-time monitoring of resource utilization like memory usage, DB connection pools and Threads.</li><li>The proposed solution must be able to identify socket and file Input / Output activity from the application.</li><li>As a means of detecting poorly performing SQL, the solution must be able to proactively record all SQL calls, and report on the slow performing ones. The SQL measurements must be made from within the monitored application &ndash; not using an external database agent.</li><li>The proposed solution must monitor performance of all stored procedures being executed from within the Java/.NET application.</li><li>The solution should have provision for automatic transaction discovery, for example by setting up some bounding parameters to describe transactions like the web site, the language, and parameters (such as post, query, and cookies).</li><li>The proposed solution must provide ability to monitor performance of applications up to the method level of execution (Java/.Net method) 24x7 in production environments with negligible impact on monitored application.</li><li>The proposed solution must be able to report on any application errors occurred while executing application functionalities and pinpoint exact place of error within transaction call stack.</li><li>The proposed solution must provide for at least 2 levels of thresholds which can be set on alerts and provide for actions so that alerts can automatically trigger other processes when thresholds are breached. The proposed solution must not necessitate any changes to application source code.</li><li>The proposed solution must proactively identify any thread usage problems within applications and identify stalled (stuck) threads.</li><li>The proposed solution should allow query statement normalization by aggregating hundreds of related query statements into a single performance metric using regular expressions and pattern matching.</li><li>The proposed solution must monitor individual web service and performance transaction debugging for web services. The proposed solution must also monitor web services across multiple processes (cross JVM tracing)</li><li>The proposed solution should eliminate problem resolution guesswork by using its performance metrics to automatically identify complex emerging performance issues, enabling triage and diagnosis teams to solve problems faster and understand their environments better.</li></ol><p>End-User Experience Management System</p><ol><li>The solution should act as a passive listener on the network thus inducing zero overhead on the network and application layer.</li><li>The proposed system must be able to detect user impacting defects and anomalies and reports them in real-time:<ol><li>Slow Response Time</li><li>Fast Response time</li><li>Low Throughput</li><li>Partial Response</li></ol></li><li>The proposed system must be able to provide the ability to create user groups based on application criteria or location and link user ids to usernames and user groups.</li><li>The proposed system must be able to provide user usage analysis and show how user&#39;s success rate, average time and transaction count has changed over a specific period such as current week versus previous week.</li><li>The proposed system must be able to provide the ability to detect and alert when users experience HTTP error codes such as 404 errors or errors coming from the web application.</li><li>The proposed system must be able to provide root-cause probability graphs for performance problems showing the most probable root-cause area within application infrastructure.</li><li>The proposed solution should be capable of identifying the problem domain (browser, network or application) thereby it should monitor the browser side metrics and provide reports in real time for:<ol><li>DOM Construction Time (ms)</li><li>Page Load Time (ms)</li><li>Previous page unload time (ms)</li><li>Browser Render Time (ms)</li><li>Page Roundtrip Time (ms)</li><li>Responses Per Interval (browser activity)</li></ol></li><li>The proposed solution should be capable of collecting Browser metrics without the need to install any agents on the end user desktops, by way of dynamic java script injection.</li><li>The proposed solution must be able to provide real time transaction health metrics and end user experience quality metrics anytime, anywhere for the business executives.</li><li>The proposed solution must be able to provide the business executives the flexibility to select, organize and monitor real time business indicators with the help of an interactive user interface</li><li>The proposed solution must be able to work consistently on a variety of mobile devices such as iPhone, iPad, Android phones etc.</li><li>The proposed solution must be able to provide flexibility by enabling addition of annotations to business indicators to enhance clarity and context around its behaviour enabling better information sharing and collaboration.</li><li>The proposed solution must be able to maintain centralized control of data and security of the data that is viewed on the smart devices like iPhone, iPad etc.</li></ol><p>General Monitoring Platform Requirements</p><ol><li>The Monitoring Solution should provide End to End Monitoring of Complete IT Infrastructure including:<ol><li>Server Monitoring</li><li>Application Monitoring</li><li>End User Experience Monitoring</li><li>Database Monitoring</li><li>Virtualization Platform Monitoring</li><li>Storage Monitoring</li></ol></li><li>The proposed solution should be capable to provide hybrid monitoring architecture through agent/agentless approach</li><li>The Platform must support Event Correlation Alerting (ECA) integrations to trigger automated creation of incidents, problems, and changes based upon alarms and events correlation.</li><li>The proposed monitoring solution should provide capability to integrate with hardware monitoring platforms.</li><li>The proposed monitoring solution should possess the inherent capability to leverage API&rsquo;s and SDKs to enable integration and monitoring.</li><li>The proposed monitoring solution should have capability to configure actions based rules for set of pre-defined alarms/alerts enabling automation of set tasks.</li><li>The Platform must include an event correlation automatically fed with events originating from managed elements, monitoring tools or data sources external to the platform. This correlation must perform:</li></ol><ol><li>Event filtering</li><li>Event aggregation</li><li>Event masking</li></ol><ol><li>The Reporting Portal should be Completely web based with ability to define Accounts and Users for Role Relevant Views</li><li>The proposed solution should provide the ability to create custom dashboards with ability to aggregate metrics from all monitored devices and should provide drill down functionality to other defined dashboards within the tool.</li><li>The proposed solution should provide ability to monitor and generate alarms for set threshold for pre-defined Service level agreement for monitored metrics. The proposed monitoring solution should provide functionality to sync with online library for latest updates and support for new functionalities.</li></ol><p>Server Monitoring Requirements</p><ol><li>The Solution should monitor heterogeneous operating systems for both physical and virtual environments OS including but not limited to Windows 32/64 bit, All Major Flavours of Linux, Solaris, Unix etc.</li><li>The solution should be able to monitor non-SNMP devices (e.g., using WMI, Telnet, SSH etc.)</li><li>The solution should monitor all server files and directories.</li><li>The solution should monitor File System Mounts for presence / absence / functionality</li><li>The solution should generate alarms based on what is currently mounted compared with what is configured on a defined compliant system.</li><li>The solution should support monitoring any ASCII based log files.</li><li>The solution should support monitoring of Windows Event Logs and provide correlation of events for these.</li><li>The solution should support monitoring of performance counters in Windows/Linux environment.</li><li>The solution should support monitoring of services/processes in a Windows / Linux environment.</li><li>Processes monitoring should also have ability to track CPU and Memory consumption of the monitored process for alerting and reporting/trending purpose.</li><li>The solution should report on services not in the expected state and optionally start or stop them.</li><li>The solution should support the monitoring of processes &amp; taking automated actions</li><li>The solution should support monitoring new processes that come up on a server.</li><li>The solution should support monitoring CPU performance over defined user defined time periods of time</li><li>The solution should support monitoring Availability and performance of memory, including upper and lower thresholds and types of usage</li><li>The solution should support monitoring Local and Attached Disk capacity and provide delta change in used capacity</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Alerts &amp; Log Messages, including regular expression matching.</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Performance counters for IO</li><li>In Windows/UNIX/Linux environments the solution should support monitoring Running services and in-progress jobs</li><li>The solution must monitor the availability, health, and performance of Microsoft Distributed File Services namespace and replication.</li><li>The Solution should Monitor automatic reboots of servers</li><li>The Solution should support monitoring new processes that come up on a server</li></ol><p>Network Monitoring Requirements</p><ol><li>The Solution should provide capability to monitor any device based on SNMP v1, v2c &amp; 3</li><li>The Solution should monitor bandwidth utilization.</li><li>The Solution should monitor utilizations by type of traffic.</li><li>The Solution must be capable of monitoring the availability, health, and performance of core networking devices including but not limited to CPU, memory, temperature</li><li>The Solution should have the ability to issues pings to check on availability of ports, devices.</li><li>The Ping Monitoring should also support collection of packet loss, Latency and Jitters during ICMP Ping Checks</li><li>The Port Check for IP Services monitoring should also provide mechanism to define new services and ability to send custom commands during port check mechanism.</li><li>The Solution should have the ability to receive SNMP traps and syslog.</li><li>The Solution should automatically collect and store historical data so users can view and understand network performance trends.</li><li>The solution should be capable of monitoring network delay/latency</li><li>The solution should be capable of monitoring delay variation</li><li>The solution should be capable of monitoring packet loss, Packet QOS, Packet Errors on one or more ports</li><li>The solution should allow users to access network availability and performance reports via the web or have those delivered via e-mail.</li><li>The solution should support auto-discovery of network devices</li><li>The solution should have the ability to schedule regular rediscovery of subnets.</li><li>The solution should provide the ability to visually represent LAN/WAN links) with displays of related real-time performance data including utilizations.</li><li>The system should provide discovery of heterogeneous physical network devices like Layer-2 &amp; Layer-3 switches, Routers and other IP devices and do mapping of LAN &amp; WAN connectivity.</li><li>The solution should provide capability to mask the default port speed for accurate % port utilization reporting</li><li>The System shall support monitoring of Syslog</li><li>The solution should provide capability to add an IP device or IP Range or IP subnet with functionality supporting multiple SNMP strings.</li><li>The solution should provide capability to add devices from word or excel file by drag and drop functionality and auto configure based on pre-defined settings.</li><li>The solution should allow easy configuration of polling frequency till per second scenario.</li><li>It refers to how much digital information we can send or receive across a connection in a certain amount of time.</li></ol><p>Database monitoring requirements</p><ol><li>The solution should monitor multiple database servers and multiple versions of each server including Oracle/ SQL Server/ Informix/ DB2/Sybase/MySQL/NoSQL and others including database proposed by SI.</li><li>The Solution should Provide SQL Response Time for Monitoring Custom Queries</li><li>The Solution should provide response time Monitoring for custom queries through JDBC Mechanism to allow monitoring unsupported databases</li><li>Database Space Monitoring for both file group and transaction log (Warning threshold, Critical threshold as well as file group/log full)</li><li>Performance monitoring - capture of DB Engine related performance counters as well as threshold alerting</li><li>The solution must support SQL Agent monitoring - failed jobs, long running jobs</li><li>The solution must support Database Health and Settings - Check database status (offline, suspect), Check database options (auto grow, auto shrink, auto close etc.)</li><li>The solution must support monitoring of Replication, DB Mirroring and Log shipping if applicable</li><li>The solution must be able to report &amp; check for last recent Full database backup and last recent Transaction Log backup</li><li>The solution must monitor for Blocking (exceeding duration) and Deadlocks</li><li>The solution must be able to run PowerShell, VBScript, cmd and VBScripts to perform tests on the database and have the results put into the solution as performance data and or alarms</li><li>Inclusion of SQL statements within the Solution should be a standard &ldquo;easy-to-use&rdquo; function achieved without programmatic intervention.</li><li>The solution should support auto-discovery of database instances.</li><li>The solution should support the creation and management of reusable test templates that contain a specific pre-defined set of database checkpoints/measurements.</li><li>The solution should support the use of schedules and time filters for database monitoring.</li></ol><p>Virtualization Monitoring Requirements</p><ol><li>The solution should provide support for leading virtualization platform like VMware, Hyper-V, Zen, IBM PowerVM, KVM etc.</li><li>The solution should support monitoring of virtualized environment through management interface.</li><li>The solution should provide capability to monitor events generated by the hypervisor to generate alarms and alerting functionality</li><li>The solution should provide capability to create monitoring template and auto configure any newly detected virtual machine.</li><li>The solution should provide a configurable interface to view performance metrics related to virtualization infrastructure</li><li>The solution should provide capability to monitor the availability to Web APIs of application.</li><li>The proposed solution should be integrated with centralised monitoring tool to enable aggregation of alarms and alerts.</li><li>The proposed solution should allow reporting through unified reporting console along with other infrastructure devices being monitored.</li></ol><p>Storage Monitoring Requirements</p><ol><li>The proposed solution should be able to monitor leading enterprise storages through standard interfaces</li><li>The proposed solution should be able to monitor In depth metrics and performance data for supported storage platforms</li><li>The proposed solution should automatically discover storage configuration and auto-applies monitoring by template</li><li>The proposed tool should be able to monitor other storage devices through SNMP</li></ol><p>SLA monitoring requirements</p><ol><li>General: The solution most support Service Level Agreements Lifecycle Management including Version Control, Status Control, Effectively and audit Trail.</li><li>General: The solution must provide a flexible framework for collecting and managing service level templates including Service Definition, Service Level Metrics, Penalties, and other performance indicators.</li><li>Service Delivery: The solution must have the ability to define and calculate key performance indicators from an End-to-End Business Service delivery perspective.</li><li>Contract Management: The solution must support dependencies between supplier contracts and internal or external contracts.</li><li>Bonus &amp; Penalty: Support for Defining and Calculating service Credit and Penalty based on clauses in SLAs. Support for Defining and Calculating service Bonuses based on clauses in SLAs</li><li>Alerts: The solution must support delivery mechanisms to indicate/notify whether SLA targets are being achieved or violated.</li><li>Business Impact Analysis: The solution must make it possible to find the underlying events that cause the service level contract to fail.</li><li>Dynamic Calculations: The solution supports dynamic service level targets to reflect obligations importance and priority over time.</li><li>Audit Trails: Full electronic audit trails available for both system and user transactions.</li><li>Reporting: Report module and SLA Management module must be integrated to provide ease-of reports configuration and execution.</li><li>ITIL: The solution supports ITIL standards.<ol><li><ol><li>Operations</li></ol></li></ol></li></ol><ol><li>The application should have inbuilt analytics capability and able to generate user friendly MIS reports, Graphical reports etc. in customized and standard form. The following types of reports, but not limited to, are required to be generated from this sub module. The report should be generated in standard formats like MS Word, MS Excel, Adobe Acrobat files etc.:</li></ol><ol><li>Fixed Format Reports: Application should have robust reporting capability, and should be able to generate in multiple formats including XML, MS Word, MS Excel, Adobe Acrobat files etc. The output should be delivered through email or should be printed.</li><li>Ad-hoc Reports: Application should provide ad hoc query and analysis capability so that business users could create new analyses from scratch or modify existing analyses.</li><li>Tools and utilities should be provided to facilitate design layout using MS Word, MS Excel, Adobe Acrobat etc.</li><li>System shall allow user to generate MIS reports/previous trends/graphics etc. as per the business process requirements. They should be customizable as per&nbsp;user requirements.</li></ol><ol><li>The application should provide dynamic dashboards to pre-defined users. The layout and content of the dashboard would be based on the user role/ category/ type etc.</li><li>The application shall periodically and automatically save the data entered by the user into the system during a live session and shall make the data available to the user as intermediate save even after expiry of the session. System should prompt the user regarding availability of intermediate/ draft data and ask for the permission to save or discard this data.</li><li>The application should provide functionality to users in generating customized reports on their own without having knowledge about technical programming.</li><li>Any document or report should be previewed before printing.<ol><li><ol><li>Stages of Application Development</li></ol></li></ol></li></ol><p>Each phase of application development and implementation for TNUHDB Digitalization systems need to adhere the below lifecycle:</p><p><strong><em>Project Initiation</em></strong></p><ol><li>The SI shall prepare and submit a project inception report, which will serve as the foundation document for all activities related to the project. The inception report should at least have the following.<ol><li>Description of SI&rsquo;s organization with their proposed staffing, roles, and responsibilities</li><li>Overall project organization and communication structure</li><li>Project monitoring and management tools to be used for successful monitoring &amp; management of the project</li><li>Security and confidentiality practices in accordance with industry best practices to ensure the security and confidentiality of sensitive information, documents, records, software, data, reports, deliverables etc. handled during the entire project.</li><li>Succession planning with requisite checks, handover in case of employee replacement.</li><li>Project plans giving schedule wise details of various tasks, and subtasks, task completion timelines, dependencies, deliverables, milestones, resource deployment, meetings, reviews, and information required from TNUHDB.</li><li>project risks that the SI anticipates and plans to propose towards the risk mitigation.</li></ol></li><li>The SI will be responsible for preparation of detailed project plan. The plan shall address at the minimum the following:<ol><li>Define an organized set of activities for the project and identify the interdependence between them.</li><li>Resource planning and loading for each phase/activity. This must also indicate where each resource would be based during that phase, i.e., onsite at the TNUHDB office or off site at SI premises.</li><li>Establish and measure resource assignments and responsibilities</li><li>Highlight the milestones and associated risks</li><li>Communicate the project plan to stakeholders with meaningful reports.</li><li>Measure project deadlines and performance objectives.</li><li>Project Progress Reporting. During the implementation of the project, the SI should present weekly reports. This report will be presented in the Project Working Group (PWG) meeting to TNUHDB. The report should contain at the minimum the undermentioned:<ol><li>Results accomplished during the period (weekly)</li><li>Cumulative deviations from the schedule date as specified in the finalized Project Plan</li><li>Corrective actions to be taken to return to planned schedule of progress</li><li>Plan for the next week</li><li>Proposed revision to planned schedule provided such revision is necessitated by reasons beyond the control of SI</li><li>Support needed</li><li>Highlights/lowlights</li><li>Issues/Concerns</li><li>Risks/Show stoppers along with mitigation</li><li>Proposed changes if any for consideration of Change Advisory Board</li></ol></li></ol></li><li>Identify the activities that require the participation of client personnel (including TNUHDB, the Program Management Unit etc.) and communicate their time requirements and schedule early enough to ensure their full participation at the required time.</li><li>The SI shall be responsible for providing a web-based Project Management Tool for the department and PMC for reporting and monitoring the progress of the project.</li><li>The SI shall be responsible for providing an online repository tool for maintaining project documentation with version control.</li></ol><p><strong>System Requirement Study </strong></p><p>The SI must perform the detailed assessment of the business requirements and IT Solution requirements at TNUHDB&rsquo;s Offices as mentioned in this RFP.</p><p>Based on the understanding and its own individual assessment, SI shall develop &amp; finalize the System Requirement Specifications (SRS) in consultation with TNUHDB and its representatives. While doing so, SI at least is expected to do following:</p><ol><li>In case of any change in indicative business process and software requirement as mentioned into &ldquo;Functional Requirements&rdquo; of this section will provide the modified business processes to the SI. SI shall study and revalidate the same with TNUHDB at the time of construction and submit as an exhaustive FRS document.</li><li>SI shall translate all the requirements as captured in the FRS document into SRS.</li><li>SI shall develop and follow standardized template for requirements capturing and system documentation.</li><li>SI must maintain traceability matrix from RFP to FRS to SRS stage for the entire implementation.</li><li>SI must get the sign off from PIC formed by TNUHDB.</li><li>For all the discussion with TNUHDB team, SI shall be required to be present at TNUHDB office with the requisite team members.</li></ol><p><strong>Solution Design </strong></p><p>The SI shall build the solution as per the indicative solution architecture. The solution proposed by SI should comply with the solution architecture requirements as mentioned therein.</p><p><strong>Development</strong></p><p>The SI shall carefully consider the scope of work and provide a solution that best meets the TNUHDB Digitalization System&#39;s requirements. The development of the application software will follow the procedure mentioned below:</p><ol><li>Software Products (Configuration and Customization): In case SI proposes software products the following need to be adhered:<ol><li>SI will be responsible for supplying the application and licenses of related software products and installing the same to meet TNUHDB Digitalization System&#39;s requirements.</li><li>SI shall have provision for procurement of licenses that are perpetual and that should cater to unlimited users. The source code of licenses should be handed over to TNUHDB after contract period.</li><li>Source code access to be handed over to TNUHDB</li></ol></li><li>Bespoke (Custom Developments):<ol><li>The successful SI shall identify, design, and develop components/functionalities that are required to address the TNUHDB requirements mentioned in this RFP.</li></ol></li><li>In both cases of Software Product and/or Bespoke development, SI shall also supply any other tools &amp; accessories required to make the integrated solution complete as per requirements. For the integrated solution, the SI shall supply:<ol><li>Software &amp; licenses.</li><li>Supply tools, accessories, documentation and provide a list of the same. Tools and accessories shall be part of the solution.</li><li>System Documentation: System Documentation both in hard copy and soft copy to be supplied along with licenses and shall include but not limited to following. Documentation to be maintained, updated, and submitted to TNUHDB regularly:<ol><li>Functional Requirement Specification (FRS)</li><li>High level design of whole system</li><li>Low Level design for whole system / Module design level</li><li>System requirements Specifications (SRS)</li><li>Any other explanatory notes about system</li><li>Traceability matrix</li><li>Compilation environment</li><li>Technical and product related manuals</li><li>Installation guides</li><li>User manuals</li><li>Business process guides</li><li>Program flow descriptions</li><li>Data model descriptions</li><li>Sample reports</li><li>Screen formats</li><li>Frequently asked questions (FAQ) guides</li><li>System administrator manuals</li><li>Toolkit guides and troubleshooting guides</li><li>Other documents as prescribed by TNUHDB</li><li>Quality assurance procedures</li><li>Change management histories</li><li>Version control data</li><li>SOPs, procedures, policies, processes, etc. developed for TNUHDB</li><li>Programs:<ol><li>Entire source codes</li><li>All programs must have explanatory notes for understanding</li><li>Version control mechanism</li><li>All old versions to be maintained</li></ol></li><li>Test Environment:<ol><li>Detailed Test methodology document</li><li>Module level testing</li><li>Overall System Testing</li><li>Acceptance test cases</li></ol></li><li>Any other documentation required for usage of implemented solution</li></ol></li></ol></li></ol><p>Note: These documents need to be updated after each phase of project and to be maintained updated during entire project duration. The entire documentation will be the property of TNUHDB.</p><p><strong>Testing</strong></p><p>The SI shall provide the testing strategy including traceability matrix, test cases and shall conduct the testing of various components of the software developed/customized and the solution. The testing should be comprehensive and should be done at each stage of development and implementation. SI should plan to establish an UAT environment at TNUHDB Board office under the overall control of TNUHDB. Also, System Integrator should&nbsp;provide support to set up a development environment in the TNUHDB head office itself. Preparation and submission of Testing Plans must include system testing, Defect regression testing, release regression testing, Risks and Mitigation, Test environment, tools, defect management, test phase transition criteria, test schedule and deliverables. During testing phase, it expected use industry standard tools. The Application testing mechanism shall be adopted like, Alpha Testing, Automated Testing, Black Box Testing, White Box Testing, Compatibility Testing, Functional Testing, Integration Testing, Load Testing, Performance testing, Regression Testing, Stress Testing, Acceptance Testing, Security &amp;amp, Controls Testing, etc.,</p><p>Bug Tracking: A Bug tracking software is an essential tool for managing the process of finding, tracking and fixing bug. Not only does it ensure that to deliver high -quality near-perfect application, but it also enhances the productivity of the development team throughput the application development process. A good bug tracking tool&nbsp;gives an overview of all identified errors so that nothing slips through the cracks. Reactive bug tracking also ensures that issues identified during use are promptly fixed to ensure minimal impact on product operation. A bug tracking system is required to find, fix bugs and other related issues to reduce cost of development and save time. Bug tracking system/tool should track problems and analyse efforts taken by team members to fix a bug or an issue. A bug tracking system/ tool can prioritize bugs and assign issues. Also, helps to spot repetitive problems and concentrate on important issues</p><p>The development team will be able to focus on high priority bugs rather than wasting time on smaller issues A bug tracking system/ tool should provide better communication through chat interfaces and email notifications. This reduces the communication gap and communicate to the right person to test / fix bug on time A bug tracking system should keep a record of the bug issues that are detected, who fixed them, and how long it took to fix a particular issue.</p><p><strong>Project Go- Live Pre-Requisites &amp; Go-Live</strong></p><ol><li>SI shall prepare and agree with TNUHDB, the detailed plan for Go-Live (in-line with TNUHDB&rsquo;s implementation plan as mentioned in RFP).</li><li>The SI shall define and agree with TNUHDB, the criteria for Go-Live and the timelines for the same.</li><li>The SI shall ensure that all the data migration is done from existing TNUHDB applications.</li><li>The SI shall submit signed-off UAT report (issue closure report) ensuring all issues raised during UAT are being resolved prior to Go-Live.</li><li>The SI shall ensure that Go &ndash;Live criteria as mentioned in User acceptance testing of TNUHDB Digitalization system is met and SI needs to take approval from TNUHDB team on the same. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</li><li>Go-live of the application shall be done as per the finalized and agreed upon Go-Live plan.</li><li>Once the System has gone live for each phase of application development the above UAT process needs to be followed.</li><li>The SI shall furnish the Go Live sign off document issued by the TNUHDB&rsquo;s Project Implementation Committee (PIC).</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure III - Track 2: Data digitalization </strong></p><p>This section provides the high-level requirements for digitalization of legacy documents and other material of TNUHDB.</p><p>There are approximately 55Lakh+ of documents that needs to be digitalized.</p><p>The location of digitalization of document shall be discussed during the project inception phase. There are confidential documents and videos which are not in public domain shall have to be digitalize at TNUHDB premise. TNUHDB shall decide on which documents are to be digitalized on premise.&nbsp;</p><p>It may be noted by the bidder that the content and files maintained, and the language of noting are in Tamil and English. The Survey Sketches for the MUDP/TNUDP and other schemes as available with CMDA to be obtained and digitalized as per TNUHDB direction. &nbsp;</p><ol><li><ol><li><ol><li>Documents scanning and digitalization requirements</li></ol></li></ol></li></ol><p>While digitalizing the documents, the SI should at least follow the following digitalization steps.</p><p><strong>Digitalization steps</strong></p><ol><li>Initiation</li><li>Pre-scanning</li><li>Data Entry</li><li>Document scanning</li><li>Indexing</li><li>Archival of Electronic Documents &ndash; Backup</li><li>Quality Check</li><li>Post scanning</li><li>Storage upload in SDMS</li><li>Data Backup</li><li>Training</li></ol><p>The sub-activities for above each step are mentioned in figure below.</p><p>&nbsp;</p><p><em>Figure - Sub-activities for Digitalization of documents</em></p><ol><li>SI, if required, may add sub-activities (to respective step) which are required for digitalization of documents. The SI must comply the activities which are provided in this section.</li><li>SI shall study from the respective Department of TNUHDB and then clearly understand the quantum of work relating to indexes accordingly. The Capturing, Indexing, and storing metadata and relevant information of these documents shall be discussed by TNUHDB with SI before starting the digitalization of the records.</li><li>SI shall maintain requisite registers for receiving the records, documents, scanning, uploading and return the same to department in TNUHDB.</li></ol><p>For example, the following details shall be captured:</p><ol><li><ol><li>Name &amp; Location of the Office</li><li>Name of Department official with mobile number</li><li>Name of the Vendor Personnel with mobile number</li><li>Type of Book/Index (Book-1, Book-2, Book-3, Book-4, Book-V, Index-1, Index-2 etc.)</li><li>Year of the document</li><li>Size-wise (A0, A1, A2, A3, A4 etc.) count of pages<ol><li>Total number of pages</li><li>Number of pages missing</li><li>Number of pages torn/damaged</li><li>Number of pages in good condition along with document numbers.</li></ol></li><li>Metadata entry fields</li></ol></li><li>Blind double data entry mechanism to minimize the QC time for the user department and to get the error free record</li><li>Ensure that the contents of the digitized documents shall be an exact replica of the original paper document maintained as part of the records in the books</li><li>Under no circumstances shall the documents be changed, mutilated, destroyed, or replaced by some other documents.</li><li>Any deviation to this shall be considered as Violation and suitable action shall be initiated against the bidder. The documents and their contents shall not be tampered with</li><li>The SI should check the quality of the scanned documents including the indexed metadata and make the same available to TNUHDB team for quality check</li><li>Each Book &amp; File should be labeled with a printed barcode sticker. The barcode should contain the parameters, which shall be discussed and mutually agreed with TNUHDB by SI</li><li>Each sheet/page shall be serially arranged and shall be counted while giving the documents back</li><li>The entire data should be uploaded onto digitalization database on cloud environment identified by TNUHDB.</li><li>The SI must take backup of the scanned documents and other related data daily</li></ol><p>&nbsp;</p><p>&nbsp;</p><p><strong>Infrastructure and manpower deployment requirements</strong></p><ol><li>The SI to deploy, arrange, install &amp; configure the required Infrastructure viz. &ndash; scanners, desktops/laptops (along with connecting cabling and power extension cords if required), printers, cameras, UPS, furnishing (table, chairs and others) &amp; manpower at the identified location of SI and/or TNUHDB for the data digitalization scope of work activities.</li><li>The confidential documents of TNUHDB shall be scanned and digitalized at TNUHDB&rsquo;s premise. TNUHDB shall provide the space for the same.</li><li>The non-confidential documents of TNUHDB can be scanned and digitalized at SI&rsquo;s premise. SI shall have to arrange the space for the same.</li><li>The space and furniture (table, chairs, etc.) for setting up the infrastructure as well as the raw power connections will be arranged by SI.</li><li>The SI must deploy, arrange, install &amp; configure the required Infrastructure viz. &ndash; scanners, desktops/laptops (along with connecting cabling and power extension cords if required), printers, cameras &amp; manpower at the identified location of SI for the Scope of work activities.</li><li>The SI deploy its own human resource for all the above-mentioned activities. SI shall deploy adequately skilled manpower resources for Supervision, scanning, data entry, indexing, unbinding, and rebinding to complete the job within the specified time.</li><li>After completion of scanning, the sheets/pages are to be made into volumes so that the original volume is recreated as is at the stage of handing over for scanning purpose and undertake proper book binding of the papers.</li><li>The method of rebinding to be used is &ldquo;Hardcover binding&rdquo; method using good quality Rexine cloth cover, head band, spine, end paper, tail paper etc. The color of the Rexine cloth shall vary for Indexes &amp; Volumes and the same shall be informed to bidder by TNUHDB Department. The binding should be undertaken with quality material with a minimum lifespan of thirty years. &nbsp;</li></ol><p><strong>Input specifications</strong></p><ol><li>Approx. 90% of TNUHDB documents of are A4 and legal size and the remaining are in other sizes such as A-3, A-2, B-4, B-5 and others. Maps and treaties are to be mainly undertaken in A0 size. Samples of different types of records shall be shown during the site visit.</li><li>Records are old, fragile, deteriorating, rare and brittle.</li><li>Some of the pages of the records have stain-marks and worm-marks.</li><li>The pages of some records have become translucent due to ageing.&nbsp;&nbsp;&nbsp;</li></ol><p><strong>Non-technical requirements</strong></p><ol><li>Rebinding of books/files/others<ol><li>After completion of scanning, the sheets/pages are to be made into volumes so that the original volume is recreated as is at the stage of handing over for scanning purpose and undertake proper book binding of the papers.</li><li>The book volumes which are in bad shape in terms of binding/cover etc. should also be rebounded to the extent possible. If rebinding is not possible, the same may be informed to TNUHDB department and with the permission of the department, the lose papers shall be preserved in polythene covers and made a volume with such loose sheets. The quality of polythene covers shall be of such that it should last for at least thirty years.</li><li>The method of rebinding to be used is &ldquo;Hardcover binding&rdquo; method using good quality Rexine cloth cover, head band, spine, end paper, tail paper etc. The color of the Rexine cloth shall vary for Indexes &amp; Volumes and the same shall be informed to bidder by TNUHDB Department. The binding should be undertaken with quality material with a minimum lifespan of thirty years.</li></ol></li><li>At the time of handing back the documents to the designated official of TNUHDB Department, if any discrepancy is noticed the same needs to be recorded in the Data entry module with proper remarks</li><li>Should archive the documents based on the defined folder and file structure, and interval or period of archival of electronic documents</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure IV - Track 3: IT Infrastructure procurement, supply, Installation, and bandwidth for the project</strong></p><p>This section details the IT, Network and security Infrastructure requirements for the various applications which are part of proposed Digital Strategy for TNUHDB.</p><p>The IT infrastructure scope includes Information Technology (IT) infrastructure procurement, deployment and maintenance of the required Infrastructure as intended.&nbsp;</p><p>System Integrator needs to do the appropriate solution design and sizing for the project as per the scope of work.</p><p>The objectives of this IT procurement are to:</p><ul><li>Provide the TNUHDB with a secure, reliable, and scalable IT infrastructure that will support its current and future needs.</li><li>Improve the efficiency and effectiveness of the TNUHDB&#39;s IT operations.</li><li>Reduce the overall cost of IT ownership for the Board.</li></ul><p>The brief scope of work for this section includes the following:</p><ul><li>Identify Cloud Service provider and build Data Centre on High Availability Cloud Site and Disaster Recovery Site with hot standby configuration</li><li>Design and implementation of Secure and Flexible Data Network for the Head office and remote offices as per user requirement</li><li>Deployment of security solutions to protect the TNUHDB&#39;s data and systems.</li><li>Provision of end-user devices and software as per user requirement.</li><li>Provision of ongoing maintenance and support services.<ol><li><ol><li>IT Infrastructure Requirements</li></ol></li></ol></li></ul><ol><li>The System Integrator shall facilitate and coordinate for procurement, supply and installation of entire IT infrastructure required for setting up and operations of the Project Management System, ERP System, Citizen Web Portal, Employee portal and Grievance Redressal Management system including the following key components of IT Infrastructure are to be setup.<ol><li><strong>Hosting of Data Centre </strong>on Cloud Service Provider Premise&nbsp;</li><li><strong>Disaster Recovery Centre</strong> on Cloud Service Provider premise</li><li><strong>Enhancement of existing Local Area Network (LAN)</strong> at TNUHDB Head Office at Chennai, Estate and Regional Offices spread statewide</li><li><strong>Data Digitization </strong>and Integration of Digitized Data with Document Management System</li><li><strong>Experience Centre </strong>at Head office of TNUHDB and <strong>Citizen Kiosk</strong> at Various Citizen Interfaces<strong> </strong></li></ol></li><li>SI needs to propose the IT infrastructure deployment architecture to meet the required security guidelines and SLA as per the RFP. SI need to provide the detailed proposed solution design to meet the requirement of RFP.</li><li>The IT infrastructure includes servers, storages, back up, networking, load balancers, security equipment, operating systems, database, enterprise monitoring system, help desk system, Computers, Printers, and other related IT infra required for running and operating the envisaged system. The IT infra procurement will be planned considering the below factors:<ol><li>Ensure redundancy at each level</li><li>No single point failure in architecture</li><li>Support peak loads</li><li>IT infrastructure deployed for TNUHDB Digitization Strategy should be dedicated but accommodative at the same time for the upcoming projects.</li><li>The ownership of IT infrastructure shall get transferred to TNUHDB after &ldquo;Acceptance and Go Live&rdquo; of such items. In case the infrastructure is proposed to be supplied by SI in phases (For assets proposed to be supplied after Go Live) the payment for the same shall also be made in phases after actual delivery and acceptance of such infrastructure at other offices at defined locations. Ownership of these infrastructures shall also be transferred to TNUHDB after verification and acceptance of such infrastructure</li><li>Initial estimate for procurement of hardware is as per the volumetric estimate for total users provided in Annexure. SI need to conduct their detailed study and shall come up with appropriate quantities for various equipment of IT infra for this project.</li><li>SI to ensure warranties/AMCs are procured for all the hardware components for entire duration of the project. For software components the support from OEM to be obtained for prescribed components. There should be a dedicated tool to maintain licensing, warranty details on annual basis.</li><li>Minimum specifications of the IT infra are detailed in Annexure &ldquo;Bill of Material (BOM) compliance sheet&rdquo; of the RFP document, the bidder needs to size and provide IT infra to meet the project functional requirements and Service Level Agreements (SLAs).</li><li>Other details relating to IT infra, info security, etc. are mentioned in &ldquo;Bill of Material (BOM) compliance sheet&rdquo; of this RFP document.</li><li>SI is to prepare and submit along with their technical bid, the details of methodologies and computations for sizing and capacity of storage, compute, Port density of network devices, sizing of security appliances and their compute requirements. The technical evaluation of responses shall analyze the computations for viability.</li><li>SI must ensure that the proposed architecture meets the security requirements as mentioned into the section &ldquo;x&rdquo; of this RFP document.</li></ol></li><li>SI must consider the following important milestones while proposing the IT infrastructure architecture for TNUHDB information portal and Digitalization system:<ol><li>Site Survey</li><li>Design assessment</li><li>Supply of Passive components</li><li>Preparation of Network room setup, network plan with rack wise node details (in form of excel tables) and cable layout route diagrams.</li><li>Cable laying and testing of the laid cable</li><li>Supply of active Components</li><li>Installation, Test Run and testing of the Head office and Remote Office Connectivity</li><li>Integration with other peripheral Systems/Services</li><li>Network Monitoring System (NMS) configuration for central monitoring and management.</li><li>Submission of test reports.</li><li>Training of technical TNUHDB&rsquo;s staff for Operations and management.</li><li>Posting of network engineers &amp; technicians at site as stipulated in contract</li><li>Security audit by a third party.<ol><li>IT infrastructure deployment plan</li></ol></li></ol></li></ol><ol><li>SI needs to propose the IT infrastructure deployment architecture to meet the required security guidelines and SLA as per the RFP. Illustrative deployment architecture at both Cloud and Head office with minimum infrastructure and security requirements is given below, however SI need to provide the detailed proposed solution design to meet the requirement of RFP. Detailed requirement related to infrastructure and security as illustrated in the design below is detailed in subsequent sections.</li></ol><p>&nbsp;</p><p><em>Figure - TNUHDB overall infrastructure deployment architecture</em></p><p>&nbsp;</p><p>Important Functional Considerations while design &amp; deployment of Architecture.</p><ol><li>All components to be maintained in redundancy with Active - Active / Active- Passive Clustering based on the SLA requirements, architecture, and performance. The systems architecture should clearly demonstrate and highlight the key requirements of TNUHDB viz reliability, availability, scalability, survivability, resilience, and serviceability of individual critical components.</li><li>Servers should be based on x86 platform in high density form factor to ensure optimal power and space usage. However, bidder may suggest rack form factor for any specific server usage, stating clearly the benefits being derived without compromising on the power and cooling factors</li><li>The architecture should have horizontal scalability. Benefits/additional security, reliability, availability features at the server level architecture would be given due consideration during evaluation.</li><li>SI needs to comply with the high availability requirements for the IT Infrastructure.</li><li>Redundancies/teaming should be maintained at different interconnecting fabrics to avoid any single point of failure / performance bottleneck.</li><li>The backup solution should ensure minimization of data to be backed-up / archived keeping in view a window of 8 Hours without any impact on the performance of the servers.</li><li>Networking equipment should be capable of processing IPV4 &amp; IPV6 traffic. Security features that are delivered shall be IP v 6 ready</li><li>All devices should be IPv4 and IPv6 ready from day 1. SI shall deploy IPv4 and IPV6 dual stack supported network from day 1. The proposed solution and all appliances should meet this requirement. The SI shall also be responsible for security adherence on both IPv4 and IPv6.</li><li>Bidder should utilize virtualization technology to optimize the solution and provide benefits for the overall Cost of ownership and ease of maintenance wherever required.</li><li>DNS server is required for domain name and the interoperation between Primary DC and DR site should be such that due to any failure of any/all module at DC level can automatically (manual optional) be operated from DR site.</li><li>SI need to provide the published benchmarks for the stated systems along with the sizing assessment sheet being certified by the OEM for the stated systems.</li><li>The bidder shall submit the OEM authorization letter, in original duly clearly attested as per prescribed format for the following components.<ol><li>Server, Workstations, Plotter &amp; Storage if any</li></ol></li></ol><ol><li><ol><li>Firewall/UTM, IPS, Load Balancer</li><li>All Active Network equipment like, router, switches, wireless Access Points, NMS</li><li>Passive Network equipment like, Fiber optic cable, Patch cords, LIU, CAT 6 cable, Patch panel, Racks.</li><li>Video wall, AV Components</li><li>Software like Antivirus, EMS, Helpdesk &amp; Contact Centre solutions<ol><li>Cloud Hosting</li></ol></li></ol></li></ol><p>The scope of services for the Cloud hosting of Data Center is as follows:</p><ol><li>TNUHDB is considering a High Availability Site on cloud platform which would host all applications, application data, User data and Digitized Data. A Suitable cloud environment in terms of compute, storage, managed network &amp; security services should be offered by Cloud Service Provider. A quick turnaround to cloud-based failover system for business continuity shall considered through disaster recovery site which would be clone of HA site.</li><li>SI shall be responsible for<ol><li>setting up, installation, configuration, management, upgradation, and migration of application servers, database servers/storage.</li><li>Maintain and manage the required network components for the cloud services procured by TNUHDB.</li><li>Setup and configure the VMs, storage, Network, Database etc. at DC &amp; DR site meeting RPO and RTO (Recovery Time Operations) requirements of TNUHDB. Service provider shall provide access to logs for analysis.</li></ol></li><li>For this cloud-based managed service will help TNUHDB to quickly recover TNUHDB&rsquo;s critical systems after a disaster and provides client remote access to their systems in a secure virtual environment. This shall help TNUHDB to switch to failover with smaller RPO.</li><li>The SI shall be responsible for setting up, installation, configuration, management, upgradation, and migration of application servers, database servers/storage. Implementation includes finalize Migration Preparation, Preparation of new Procedures, Migrate Data, Finalize Migration Effort, Cost Benefit Analysis</li><li>The SI should maintain and manage the required network components for the cloud services required for TNUHDB. Setup and configure the VMs, storage, Network, Database etc. at DC &amp; DR site meeting RPO and RTO (Recovery Time Operations) requirements of TNUHDB. Cloud Service provider shall provide access to logs for analysis.</li><li>The SI shall consider only &ldquo;MeitY&rdquo; or &ldquo;Government of Tamil Nadu&rdquo; empaneled cloud service providers for hosting DC &amp; DR site.</li><li>DC &amp; DR Site should preferably be in the following cities:</li></ol><ol><li>Bangalore City</li><li>Chennai City</li><li>Hyderabad City</li><li>Kolkata City</li><li>Mumbai City</li></ol><ol><li>Cloud Service Provider should host the entire Cloud infrastructure in a secure Data Centre which should be at least Tier 3 Compliant facility adhering TIA 942 standard.</li><li>Cloud Service Provider should ensure that Data Centre constructed to world class hosting standards as defined by the &ldquo;Uptime Institute, USA&rdquo;.</li><li>Cloud Service Provider should ensure that services provided are to be backed by high QOS (Quality of Service) / SLA (Service Level Agreement)</li><li>Cloud Service Provider should ensure to have Centralized NMS (Network Management Systems) &amp; 24*7*365 helpdesk for services related to DC &amp; DR site.</li><li>Cloud Service Provider should provide advanced system security, monitoring &amp; management with Video surveillance, fire detection &amp; suppression system as per standards of Data Centre</li><li>Cloud Service Provider should ensure that Fire Suppression and Protection System should include three levels of redundancy based on Gas Fired Systems, Carbon Monoxide based systems and Water Sprinkler based systems.&nbsp; Bidder should ensure that the floors as well as the ceiling should be based on false flooring and ceiling where the wire conduits and the fire protection systems are installed.</li><li>Cloud Service Provider shall be responsible for implementation, management, and monitoring of DDOS, IPS, IDS Services, etc. Service provider will implement anti-malware and conduct regular vulnerability scanning and penetration testing of systems and infrastructure.</li><li>Cloud Service provider shall have public Services in DMZ zone and High security services in MZ Zone. Also, the Cloud Service Provider shall configure external connections to the hosting infrastructure required to upload database/files etc.</li><li>Cloud service provider is expected to understand the complete architecture of existing applications and processes necessary for smooth migration of applications and databases including interdependencies between applications and data. Bidder shall be responsible for deployment of Security patches on Hardware and Software.</li><li>Cloud Service Provider shall be responsible for migrating legacy applications to cloud if any and managing the cloud services. Also, responsible to monitor the cloud services and ensure 99.9% uptime of all services as per agreement.</li><li>Cloud service provider shall establish connectivity between TNUHDB Head office to Cloud DC &amp; DR Site. Also, SI shall ensure Deployment of New Applications on cloud, security administration, planning and implementation of cloud management and monitoring portals for complete infrastructure and services procured.</li><li>Service Provider shall provide inter-operability support with regard to APIs and Data Portability.</li><li>The SI shall be responsible for monitoring and reporting services.</li><li>Provisioning of scalable storage capacity as per requirements of TNUHDB and availability of such services as per agreement. Cloud Service provider shall ensure committed time taken for restoration of data from Backup as claimed.</li><li>Cloud Service provider shall demonstrate/Submit documentary proof for POC (Proof of Capability) as part of technical evaluation to understand the key features such as AUTO Scale up/down, Cloud Elasticity, Security protocols, Denial of Service (DoS, DDoS) attack), management and administration and audit capabilities of offerings, setting up of DC &amp; DR facilities, etc.</li><li>Service provider shall provide necessary technical documentations, design documentations, standard Operating Procedures (SOPs) required for operations and management of services.</li><li>All risk management related to migration, migration plan shall be jointly worked out with TNUHDB and Cloud Service Provider.</li><li>Service provider with SI shall assist TNUHDB in planning for capacity building to meet growth and peak load assessment at the end of first year to ensure future requirements of TNUHDB are addressed.</li><li>The service provider shall provide necessary details including sizing, current loads, utilization, expected growth/demand and other details for scale up/scale down at the end of first year in close coordination with TNUHDB.</li><li>Service provide shall provide Annual Technical Support from OEM under (Software procured as PaaS) during entire period of Contract.</li><li>TNUHDB and Service provider shall jointly workout multi-factor authentication for root account as well as any other privileged identity and access account associated with it.</li><li>Service provider shall be responsible for implementation of tools and processes for monitoring the availability of applications, responding to system troubleshooting.</li><li>Monitoring of performance, resource utilization and other events such as failure of services, degradation of services, availability of network, storage, Database systems, OS etc.</li><li>Provide the relevant reports, including real time as well as past data/reports on dashboard.</li><li>Service provider shall be responsible for conduct of DR Drills and follow Standard Operating Procedures (SOP) and inform TNUHDB in advance for such drills conducted twice a year normally, with 15 days&rsquo; prior notice.</li><li>There should not be any data loss during backup from DC to DR.</li><li>Service Provider shall monitor Internet Links, MPLS -VPN including bandwidth, data transfer, response time and packet loss and perform corrective measures.</li><li>After the implementation of exit process, cloud service provider will delete/remove VMs, contents and data with approval of TNUHDB and ensure data cannot be forensically recovered and intimation of compliance thereafter.</li><li>The Service Provider will train and transfer the knowledge to the replacement agency or TNUHDB to ensure continuity and performance of services post expiry of Contract.</li></ol><p><strong>Role of SI in Cloud Hosting</strong></p><ol><li>SI shall be responsible for management of all TNUHDB&rsquo;s web applications hosted on Service provider&rsquo;s platform or any other environment.</li><li>SI shall be responsible for all web application SLA with TNUHDB.</li><li>SI shall be responsible for design/development and management of all web applications.</li><li>SI shall be hosting applications on Service provider&rsquo;s platform which include application configuration, addition and deletion of modules and ensure application functionality as per end user&rsquo;s requirements.</li><li>SI shall be responsible for planning and sizing of applications along with its architecture.</li><li>SI shall be responsible for remote administration of applications on VMs provided by Service provider through VPN.</li><li>SI will estimate the requirements of Infrastructure resources (like VMs, Storage etc.) for different environments such as production, pre-production (non-live environment), test environment etc.</li><li>SI shall workout minimum resource requirements as well as indicative requirements of services like IP address/Load/Data transfer in Local and DR site etc.</li><li>In case of New Projects TNUHDB will procure software, licenses or may procure/ subscribe the minimum required licensees as part of PaaS (Platform as a Service)</li><li>SI will specify additional Security requirements for some applications like PCI-DSS. Data Encryption, Third Party authentication support (e.g., e-sign/Digital signing Certificates) for Payment gateway requirements.</li><li>SI with TNUHDB shall define the data retention period for all applications as per need basis application-wise.</li><li>SI with TNUHDB shall define the Log retention policy, application-`wise as per need.</li><li>SI shall work out estimated size of data for backup wherever possible.</li><li>SI shall be responsible to conduct of regular vulnerability scanning and penetration testing of applications and fixing up of such vulnerabilities.<ol><li><ol><li>Local Area Network</li></ol></li></ol></li></ol><p>The scope of services for the Local Area Network (LAN) is as follows:</p><ol><li>The SI shall design, build, operate, and maintain the LAN (at TNUHDB Head office and other offices spread statewide) during the project duration. The objective of creating LAN is to connect all the offices &amp; to have seamless internet connectivity to all users/employees in those offices.</li><li>The SI shall consider all necessary hardware &amp; software required to setup Local area network for easy dissemination of information. If any additional hardware/software required other than specified equipment to comply all points of scope of work and technical requirement, SI needs to specify the same in technical bid.</li><li>In existing LAN set up, the users are connected over copper UTP backbone through creating distribution hubs for every office or floors. SI shall consider replacing the old devices and setting up Gigabit LAN on fiber optic backbone using distribution switches at TNUHDB Network room &amp; access switches at every floor for last mile connectivity.</li><li>All the networking equipment shall be housed in separate rack at TNUHDB Network room and shall be referred as network racks. These racks will house core router, firewall/UTM, Core Switch &amp; the passive networking equipment with&nbsp;</li><li>The SI shall consider providing efficient data security solutions which will keep the sanctity of data intact.</li><li>Network Fabric should support both IPv4 and IPv6 from day one.</li><li>The head office and remote office network will be monitored and managed through Network Monitoring System (NMS) or Enterprise Management System from NOC. Required Server infrastructure &amp; software for NMS shall also be considered by bidder.</li><li>The SI shall consider minimum Gigabit switches with suitable port density as per users on each floor and shall keep 20% spare considering future prospect.</li><li>The SI shall provide Face plate, backbox &amp; information outlets for each node as per provided technical specification.</li><li>The SI shall consider CAT6A shielded UTP cable for internal cabling at offices, while cables shall be laid through a good quality PVC conduit of appropriate diameter.</li><li>Wireless connectivity through access points shall be considered to provide internet connectivity to mobile devices at offices &amp; office lobbies, a fast &amp; smooth handoff shall be featured to provide seamless mobility of devices. WLAN shall be monitored for authentication &amp; metering perspective, if required.<ol><li><ol><li>Network Operation Centre (NOC)</li></ol></li></ol></li></ol><p>SI shall build operate a network room cum operation centre from where it will house Network and Security equipment all Enterprise resources like Network, Applications, Hardware, and Connectivity to be monitored and analyzed for the day-to-day operations at TNUHDB Head Office.</p><ul><li>TNUHDB intends to host all their network equipment such as switches, routers, racks and security equipment such as load balancers and firewall in the NOC</li><li>IT Administrators for various systems shall be based out of Network Operations Centre (NOC) and they will collect and monitor the logs of various systems for any fault or errors. Space for monitoring team should be considered while designing.</li><li>Also, the NOC may host rack servers and these rack servers shall host common services such as Active directory/domain controller, Antivirus application and other local services.SI to make sure that these services are high availability.</li></ul><p>SI to make sure these services are</p><p>The scope of services for the Network Operations Centre (NOC) is as follows:</p><ol><li>The SI shall build, operate, and maintain the NOC during the project duration. The minimum specified work to be undertaken by SI for setting up and operating and maintaining NOC has been categorized as under:<ol><li>Design, Supply, Installation, and Commissioning Phase of Network</li><li>Operation and Maintenance phase</li></ol></li><li>Design of the NOC<ol><li>The SI should consider designing NOC</li><li>The TNUHDB shall provide the adequate space [of approx.300 sq. ft.] for building the proposed NOC. The existing servers and racks if any to be accommodated in this newly built NOC. The SI may assess the existing infrastructure by visiting proposed site location, if required and accordingly submit the proposal</li><li>The NOC shall be provided with sufficient electrical connections, Air conditioning, backup power through UPS, Electronic surveillance, access control system, fire detection &amp; suppression system and other soft services as applicable for network operations centre as required for the proposed equipment on 24 x 7 x 365 basis to maintain 100% uptime of network equipment.</li><li>The SI should ensure the multi-layer security infrastructure to prevent unauthorized access to the network &amp; monitoring system.</li><li>The SI should ensure to provide high quality Active &amp; Passive Networking equipment and other associated IT Components in the NOC.</li><li>The NOC should be fully redundant in terms of electrical circuits, cooling, and network.</li><li>The SI with TNUDHB shall make sure that the required power, air conditioning, security system and other facilities provided is always available.</li><li>The total power requirement shall be estimated &amp; furnished in Technical Bid with 20% or appropriate redundancy in case of additional requirement.</li><li>The SI shall make necessary provisions of Telecom junction box / multiplexers for termination of internet links, if required</li><li>The nodes should connect over 1G IP connectivity. Each node shall have Minimum 2 x1G Ethernet port. There should be no use of any proprietary or specialized interconnects.</li><li>The Virtualization software should be based on hypervisor technology which sits directly on top of Hardware (Bare Metal).</li><li>The Proposed Storage Solution should support model of thin provision and thin reclaim disks to avoid allocating all storage space at initial stage.</li><li>It should support migration of the live Virtual Machine files from one storage array to another storage.</li><li>The proposed solution should deliver above listed capabilities using standard storage infrastructure. client&rsquo;s maintenance team to avoid dust entering racks/cage area.</li></ol></li><li>Supply/ Installation<ol><li>All the compute devices &amp; storage</li><li>Physical infrastructure components such as UPS and Air-Conditioning System, Fire Detection and Suppression System, Lighting system, Rodent Control, Water leakage detection system, CCTV Surveillance systems, Access Control System, Electrical Cabling and Network Cabling etc. as per requirement</li><li>IT Infrastructure components such as necessary Servers, Networking &amp; Security components, Storage media, Software and other IT components required for managing the data center.</li><li>The SI should provide racks of 42U size with inter-rack cabling, cross connects to communication area. The racks should have proper cable managers (vertical and horizontal) and troughs for complete structured cabling. Blanking panels etc., if required as per Industry best practice to be provided. The SI shall provide adequate power points of required specifications in the racks with redundant UPS power.</li><li>The rack area should be sufficient to house the maximum number of racks as mentioned above along with sufficient free space for opening of front and rear rack doors for installation/replacement/trouble shooting of hardware and movement of service personnel.</li><li>The SI shall consider installing console and monitoring systems at NOC so that IT administrators of all the proposed systems shall be stationed at NOC<ol><li>Internet Infrastructure and Connectivity</li></ol></li></ol></li></ol><p>The objective of Internet Infrastructure and connectivity is to provide secure application access to intranet and internet applications, enforcing internet/email policies and seamless transfer of data. The scope of providing the Internet Infrastructure and connectivity is as follows:</p><ol><li>The SI shall provide the Internet infrastructure and connectivity at Head Office, TNUHDB and remote offices.</li><li>The internet infrastructure and services are to be provided as per the following requirements.</li></ol><p>&nbsp;</p><table cellspacing=\"0\" style=\"width:85%\"><tbody><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:22.8pt; width:7.34%\"><p><strong>#</strong></p></td><td style=\"background-color:#4472c4; height:22.8pt; width:56.18%\"><p><strong>Location</strong></p></td><td style=\"background-color:#4472c4; height:22.8pt; width:20.24%\"><p><strong>Bandwidth (Mbps)</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:22.8pt; width:16.24%\"><p><strong>Quantity</strong></p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>1</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Internet to Head Office, Chennai</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>500</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>2</p></td></tr><tr><td style=\"border-color:#8eaadb; height:.2in; vertical-align:top; width:7.34%\"><p><strong>2</strong></p></td><td style=\"height:.2in; vertical-align:top; width:56.18%\"><p>Internet to Estate and Regional offices</p></td><td style=\"height:.2in; vertical-align:top; width:20.24%\"><p>50</p></td><td style=\"height:.2in; vertical-align:top; width:16.24%\"><p>21</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>3</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Head Office to DC/DR (MPLS)</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>10</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>1</p></td></tr><tr><td style=\"border-color:#8eaadb; height:.2in; vertical-align:top; width:7.34%\"><p><strong>4</strong></p></td><td style=\"height:.2in; vertical-align:top; width:56.18%\"><p>DC - DR (MPLS)</p></td><td style=\"height:.2in; vertical-align:top; width:20.24%\"><p>10</p></td><td style=\"height:.2in; vertical-align:top; width:16.24%\"><p>2</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:.2in; width:7.34%\"><p><strong>5</strong></p></td><td style=\"background-color:#d9e2f3; height:.2in; width:56.18%\"><p>Estate and Regional offices to Head Office (VPN)</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:20.24%\"><p>1</p></td><td style=\"background-color:#d9e2f3; height:.2in; width:16.24%\"><p>21</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>The following is a pictorial view for the above-mentioned requirements.</p><p>&nbsp;</p><p><em>Figure - Indicative Network and Internet connectivity diagram</em></p><p>&nbsp;</p><ol><li>The Internet connectivity should have fully dedicated (1:1), unshared &amp; High-Quality symmetric bandwidth without any compression factor through Optical Fiber</li><li>Installation, commissioning, configuring of the link and hardware (Modems and Router etc.).</li><li>24x7 Support for Internet Infrastructure and Services</li><li>Maintenance of Internet Infrastructure and Provide Services during the entire period of contract term.</li><li>The SI will be required to sign Service Level Agreement (SLA) having the following:<ol><li>Packet Losses: Less than 1% (Average over 1000 ping).</li><li>Network Availability: More than 99.5 % per month.</li><li>Reports for performance, monitoring /usage to be submitted by the ISP on weekly or monthly basis or as per requirement of TNUHDB.</li><li>In case of the above parameters going out of specifications, TNUHDB will be compensated adequately in respect of the extended time for the loss of hours in service. Also, if services are not found satisfactory, TNUHDB reserves the right to cancel the contract with &ndash;one-month notice.</li><li>In case connectivity from Fiber cable is failed, the same connectivity speed will have to be provided through wireless line by the service provider.</li><li>99.5% Uptime shall be calculated as, (Total Time &ndash; Down Time) X 100 /Total Time. Deduction in payment will be made for downtime in the quarterly bills raised by the SI / Service Provider (SP).</li><li>The services shall be provided 24 hours &amp; 7 days in a week.</li><li>The SI will be responsible for undertaking any civil/electrical work etc., involved from commissioning to the completion of the project, at his cost.</li><li>Obtain all necessary rights-of-way and permits for construction of pathways and installation of telecommunications cabling necessary to implement the proposed solution. The SI should take necessary permission TNUHDB will assist for the same.</li><li>Provide a low-latency, highly reliable, high-speed Internet service. The connection shall provide to TNUHDB is able to conduct business operations as per the specified bandwidth requirements and as defined by agreed upon Service Level Agreements (SLA).</li><li>The proposed connection shall be capable of meeting the defined performance standards throughout the entire term of the contract.</li><li>Network integrator for the installation, configuration management, commissioning of Internet link, establishing automatic switch-over from primary link to the backup link and vice-versa.</li><li>ISP should have fully functional 24x7x365 Customer Service Centre in Mumbai.</li><li>The ISP for providing internet connectivity should be Tier-I or Tier-II only.</li><li>Primary &amp; back up connectivity shall be from two different ISPs.</li></ol></li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure V - Track 4: Training and Capacity Building </strong></p><ol><li><ol><li><ol><li>Introduction</li></ol></li></ol></li><li>The purpose of this section is to define the scope of work for training and capacity building.</li><li>SI&rsquo;s scope of work also includes preparing the necessary documentation and aids required for successful delivery of such trainings.</li><li>The details provided in this section are indicative and the number of training sessions may increase.</li><li>SI shall be responsible for providing training to stakeholders, at least, on the usage and maintenance of TNUHDB information portal &amp; mobile app, Solution System, DC, Cloud DR, LAN, FTTP Network, Helpdesk and Experience Centre.</li><li>SI shall propose different training modules for different user profiles at the appropriate timelines in the project.</li><li>SI shall provide such additional training as they deem necessary to ensure that the training imparted is comprehensive and complete.</li><li>SI shall design a calendar of training activities, for various solution components of the TNUHDB project including at least on the Project Management System, ERP System, Citizen &amp; Employee portal Experience Centre, Helpdesk operation and others, in consultation with TNUHDB. The calendar designed shall identify the type of training (comprehensive competency-based training), topics to be covered and the details on trainee, trainer, and the venue. The training calendar is to be prepared in the following format -</li></ol><p><em>Training calendar format</em></p><table border=\"1\" cellspacing=\"0\"><tbody><tr><td style=\"background-color:#4472c4; height:30.65pt; width:36.3pt\"><p><strong>Sl. No.</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:102.9pt\"><p><strong>Type of training</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:59.05pt\"><p><strong>Topic</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:61.6pt\"><p><strong>Dates</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:77.2pt\"><p><strong>Trainer</strong></p></td><td style=\"background-color:#4472c4; height:30.65pt; width:90.8pt\"><p><strong>Trainee</strong></p></td></tr><tr><td style=\"background-color:#d9e2f3; height:30.65pt; width:36.3pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:102.9pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:59.05pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:61.6pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:77.2pt\"><p>&nbsp;</p></td><td style=\"background-color:#d9e2f3; height:30.65pt; width:90.8pt\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><ol><li>SI shall submit a training completion report to TNUHDB after completion of every training.</li><li>SI must propose an appropriate training model in their bid and must propose detailed methodology on how the training would be conducted.&nbsp;&nbsp;</li><li>SI shall be required to arrange training infrastructure along with providing the training plan, training content &amp; the training delivery and bear the cost for the same. TNUHDB shall provide the training room and the venue for the training.</li><li>SI shall be responsible for making sure that all the TNUHDB Officials and other users are technically equipped to operate the solution and related devices.</li><li>SI shall be responsible for conducting training sessions for departmental users covering TNUHDB officials in Chennai and across all Divisions, Regional and Circle Offices.</li><li>SI shall organize regular half yearly trainings for new joiners in the TNUHDB departments until their Operation and Maintenance Period.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><ol><li><ol><li>Training requirements</li></ol></li></ol></li></ol><p><strong>Types of training</strong></p><ol><li>To make TNUHDB Project a success, the following training programs are to be arranged by the SI from time to time depending on the requirement and understanding of TNUHDB Officers and Staff.</li></ol><p><em>List of Training types</em></p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:67.25pt\"><p><strong>Type of training</strong></p></td><td style=\"background-color:#4472c4; width:1.25in\"><p><strong>Relevant Stakeholders</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:310.25pt\"><p><strong>Scope</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:67.25pt\"><p><strong>Administrative &amp; Project related </strong></p></td><td style=\"background-color:#d9e2f3; width:1.25in\"><p>TNUHDB officials</p></td><td style=\"background-color:#d9e2f3; width:310.25pt\"><ol><li>Training on project management</li><li>Training on transition management</li><li>Training on change management</li><li>Training on business knowledge</li></ol></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:67.25pt\"><p><strong>Functional</strong></p></td><td style=\"vertical-align:top; width:1.25in\"><p>TNUHDB officials</p></td><td style=\"vertical-align:top; width:310.25pt\"><ol><li>Training on Project Management System application including all functions / modules</li><li>Training on Enterprise Resource Planning application including all functions / modules</li><li>Training on Data Digitalization Platform including scan, store, metadata creation, digital formats, digital records management, quality control,</li><li>Training on Citizen Web Portal</li><li>Training on Employee Portal</li><li>Training on Smart Module</li><li>Training on Helpdesk Solution</li><li>Training on Document Management System</li><li>Training on Content Management System</li><li>Training on GIS mapping</li><li>Training on BI &amp; Analytics module</li></ol></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; width:67.25pt\"><p><strong>Technical (Application &amp; Infrastructure</strong></p></td><td style=\"background-color:#d9e2f3; width:1.25in\"><ul><li>TNUHDB Officials</li><li>TNUHDB</li></ul><p>IT Team</p></td><td style=\"background-color:#d9e2f3; width:310.25pt\"><ol><li>Training on API details and integration requirements</li><li>Training on system operations</li><li>Training on IT Infrastructure setup, configuration, and troubleshooting (1st level) related training including cloud hosting, Network, Experience Centre, and others</li><li>Training on security aspects for Network, Experience Centre, and others</li><li>Training on EMS tool/software</li></ol></td></tr></tbody></table><p>&nbsp;</p><ol><li>SI shall identify at least two master trainers for each of the core areas who shall provide the relevant training. The list of such trainers to be submitted to TNUHDB from time to time (in case of any modifications). The task of the master trainers shall be to be a single point of contact for the training purpose of their respective specialized areas.</li><li>The Master Trainers shall be so identified by the SI which have complete knowledge of their respective domains (functional, technical, and operational).</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Preparation of training aids</strong></p><ol><li>SI will prepare all the requisite audio/video training aids that are required for successful completion of the training for all stakeholders. These include the following for all the stakeholders:<ol><li>Training manuals for TNUHDB officials and other stakeholders</li><li>Computer based training modules</li><li>Video (recorded sessions) for portal functionality, CMS, SDMS, business intelligence, dynamic reporting, and others.</li><li>Presentations</li><li>User manuals</li><li>Video based tutorial</li><li>Quick user guide</li><li>FAQs</li><li>Operational and maintenance manuals for the modules provided along with the TNUHDB system solutions</li><li>Application/modules training prototype for hands on training using dummy data</li><li>Regular updates to the training aids prepared under this project</li></ol></li><li>SI shall develop and supply training material at least for the following<ol><li>Applications including<ol><li>Project Management System</li><li>Enterprise Resource Planning -All modules</li><li>Data Digitalization Platform</li><li>Citizen Web Portal</li><li>&nbsp;</li><li>Employee Portal</li><li>Smart Module</li><li>Helpdesk Solution</li><li>Document Management System</li><li>Content Management System</li><li>GIS mapping</li><li>BI &amp; Analytics module</li><li>Mobile Application</li></ol></li><li>Infrastructure<ol><li>Cloud DC</li><li>Cloud DR</li><li>LAN</li><li>Experience Centre and Kiosk</li></ol></li></ol></li><li>SI must supply the training aids in Tamil and English. The material developed should be highly user friendly and such material shall be shared with TNUHDB by the SI.</li><li>SI will maintain a copy of all the training aids/material on the TNUHDB system solutions and access will be provided to relevant stakeholders depending on their need and role. The access to training on the portal would be finalized with TNUHDB. SI must ensure the following points:<ol><li>For each training session, the SI must provide the relevant training material (printed &amp; soft) copies to all the attendees.</li><li>All printed material should be in colored copies with standard printing quality</li><li>The contents developed shall be the property of TNUHDB will all rights.</li></ol></li></ol><p><strong>Number of trainings</strong></p><ol><li>SI must ensure that the personnel deployed for training are properly qualified and understand the area of their training in depth. This section covers the number of trainings that is required.</li></ol><p><em>Stakeholder&#39;s training requirements</em></p><table cellspacing=\"0\" style=\"width:100%\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; width:18.08%\"><p><strong>Stakeholders</strong></p></td><td style=\"background-color:#4472c4; width:13.64%\"><p><strong>Total Number of trainees to be trained</strong></p></td><td style=\"background-color:#4472c4; width:13.46%\"><p><strong>Minimum Number of trainees per session</strong></p></td><td style=\"background-color:#4472c4; width:11.56%\"><p><strong>Number of days or hours for each session</strong></p></td><td style=\"background-color:#4472c4; width:17.94%\"><p><strong>Training type</strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; width:25.32%\"><p><strong>Details</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:32.45pt; width:18.08%\"><p><strong>TNUHDB Officials</strong></p></td><td colspan=\"5\" style=\"background-color:#d9e2f3; height:32.45pt; width:81.92%\"><p>&nbsp;</p></td></tr><tr><td style=\"border-color:#8eaadb; vertical-align:top; width:18.08%\"><p><strong>Other Stakeholders</strong></p></td><td style=\"vertical-align:top; width:13.64%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:13.46%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:11.56%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:17.94%\"><p>&nbsp;</p></td><td style=\"vertical-align:top; width:25.32%\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><ol><li>The SI shall also be responsible for retraining the TNUHDB officials whenever changes are made in the application and/or personnel and it is the responsibility of the SI to ensure that everyone involved in the TNUHDB operations is familiar with new services.<ol><li><ol><li>Training Effectiveness</li></ol></li></ol></li></ol><ol><li>SI must ensure that the training sessions held are effective. For this purpose, SI will prepare a comprehensive feedback form that will capture necessary parameters on measuring effectiveness of the training sessions. This form will be discussed and finalized with TNUHDB.</li><li>After each training session, feedback will be sought from each of the attendees on either printed feedback forms or through a link available on the web portal. The feedback received would be reported to TNUHDB for each training session.</li></ol><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure VI- Track 5: Operations and Maintenance </strong></p><p>This section describes the operational requirements of the Digitization project which include all the Applications, Citizen portal, mobile applications and IT infrastructure such as Servers, Network set up, Security equipment, Experience Centre and Citizen Kiosk etc.&nbsp;</p><p>The high-level details of O&amp;M activities are mentioned below:</p><ol><li><ol><li><ol><li>Applications Support and Maintenance</li></ol></li></ol></li></ol><p>Application support includes, but not limited to, production monitoring, troubleshooting, and addressing the functionality, availability, and performance issues, implementing the system change requests etc. The SI shall keep the application software in good working order; perform changes and upgrades to applications as requested by the TNUHDB team. Key activities to be performed by SI in the application support phase are as follows:</p><ol><li>Compliance to SLA</li></ol><p>SI shall ensure compliance to SLAs as indicated in this RFP and any upgrades/major changes to the software shall be accordingly planned by SI ensuring the SLA requirements are met at no additional cost to the TNUHDB.</p><ol><li>Annual Technology Support</li></ol><p>The SI shall be responsible for arranging for annual technology support for the OEM products to TNUHDB provided by respective OEMs during the entire O&amp;M phase. For the following software&rsquo;s SI is mandatorily required to take enterprise level annual support for the entire contract duration:</p><ol><li><ol><li>Operating System</li><li>Virtualization layers</li><li>IT Infrastructure hardware, End user Hardware</li><li>Security Tools</li><li>Analytics tool</li></ol></li><li>Application Software Maintenance</li></ol><ol><li>SI shall provide unlimited support through onsite team/telephone/Fax/E-mail/Video Conferencing/installation visit as required</li><li>SI shall address all the errors/bugs/gaps in the functionality in the solution implemented by the SI (vis-&agrave;-vis the SRS signed off) at no additional cost during the O&amp;M phase.</li><li>All patches and upgrades from OEMs shall be implemented by the SI ensuring customization done in the solution as per the TNUHDB&rsquo;s requirements are applied. Technical upgrade of the installation to the new version, as and when required, shall be done by the SI. Any version upgrade of the software / tool / appliance by SI to be done after taking prior approval of TNUHDB and after submitting impact assessment of such upgrade.</li><li>Any changes/upgrades to the software performed during the support phase shall subject to the comprehensive and integrated testing by the SI to ensure that the changes implemented in the system meets the specified requirements and doesn&rsquo;t impact any other function of the system. Release management for application software will also require TNUHDB approval. A detailed process in this regard will be finalized by SI in consultation with TNUHDB.</li><li>Issue log for the errors and bugs identified in the solution and any change done in the solution shall be maintained by the SI and periodically submitted to the TNUHDB team.</li><li>SI, at least monthly, will inform TNUHDB about any new updates/upgrades available for all software components of the solution along with a detailed action report. In case of critical security patches/alerts, the SI shall inform about the same immediately along with his recommendations. The report shall contain SI&rsquo;s recommendations on update/upgrade, benefits, impact analysis etc. The SI shall need to execute updates/upgrades though formal change management process and update all documentations and Knowledge databases etc. For updates and upgrades, SI will carry it out free of cost by following defined process.</li></ol><ol><li>Problem identification and Resolution</li></ol><ol><li>Errors and bugs that persist for a long time, impact a wider range of users shall be identified and resolved by SI.</li><li>Monthly report on problem identified and resolved would be submitted to TNUHDB team along with the recommended resolution.</li></ol><ol><li>Change and Version Control</li></ol><p>All planned or emergency changes to any component of the system shall be through the approved Change Management process. The SI needs to follow all such processes (based on industry ITSM framework). For any change, SI shall ensure:</p><p>Detailed impact analysis</p><ol><li>Change plan with Roll back plans</li><li>Appropriate communication on change required has taken place</li><li>Proper approvals have been received</li><li>Schedules have been adjusted to minimize impact on the production environment</li><li>All associated documentations are updated post stabilization of the change</li><li>Version control maintained for software changes</li><li>The SI shall define the Software Change Management and Version control process. For any changes to the solution, SI must prepare detailed documentation including proposed changes, impact to the system in terms of functional outcomes/additional features added to the system etc. SI shall ensure that software and hardware version control is done for entire duration of SI&rsquo;s contract.</li></ol><ol><li>Maintain configuration information</li></ol><ol><li>SI shall maintain version control and configuration information for application software and any system documentation.</li></ol><ol><li>Training</li></ol><ol><li>SI shall provide training to TNUHDB officials, staff whenever there is any change in the functionality. Training plan must be mutually decided with TNUHDB team.</li></ol><ol><li>Maintain System documentation</li></ol><ol><li>SI shall maintain at least the following minimum documents with respect to the TNUHDB information portal and Digitalization systems:<ol><li>High level design of whole system</li><li>Low Level design for whole system / Module design level</li><li>System requirements Specifications (SRS)</li><li>Any other explanatory notes about system</li><li>Traceability matrix</li><li>Compilation environment</li></ol></li><li>SI shall also ensure updating of documentation of software system ensuring that:</li></ol><ol><li>Source code is documented</li><li>Functional specifications are documented</li><li>Application documentation is updated to reflect on-going maintenance and enhancements including FRS and SRS, in accordance with the defined standards</li><li>User manuals and training manuals are updated to reflect on-going changes/enhancements</li><li>Standard practices are adopted and followed in respect of version control and management.</li></ol><ol><li>All the project documents need to follow version control mechanism. SI will be required to keep all project documentation updated and should ensure in case of any change, the project documents are updated and submitted to TNUHDB by the end of next quarter.</li><li>Any software changes required due to problems/bugs in the developed software/application will not be considered under change control. The SI will have to modify the software/application free of cost. This may lead to enhancements/customizations and the same needs to be implemented by the SI at no extra cost.</li><li>Any additional changes required would follow the Change Control Procedure. TNUHDB may engage an independent agency to validate the estimates submitted by the SI.<ol><li><ol><li>IT Infrastructure Support and Maintenance</li></ol></li></ol></li></ol><p>IT infrastructure includes servers, networking, load balancers, video walls, laptop/desktop, security equipment, operating systems, enterprise monitoring system, help desk system and other related IT infrastructure required for running and operating the envisaged system. SI shall define, develop, implement, and adhere to IT Service Management (ITSM) processes aligned to ITIL framework for all the IT Services defined and managed as part of this project. IT infrastructure support and maintenance include but not limited to the below:</p><p><strong>Warranty support for deployed IT infrastructure</strong></p><ol><li>SI shall provide comprehensive and on-site warranty during the operation and maintenance period from the date of Go-Live for the IT infrastructure deployed on the project. SI need to have OEM support for these components and documentation in this regard need to be submitted to TNUHDB on annual basis.</li><li>SI shall provide the comprehensive &amp; onsite manufacturer&#39;s warranty in respect of proper design, quality and workmanship of all hardware, equipment, accessories etc. covered by the RFP. SI must warrant all hardware, equipment, accessories, spare parts, software etc. procured and implemented as per this RFP against any manufacturing defects during the warranty period.</li><li>SI shall provide the performance warranty in respect of performance of the installed hardware and software to meet the performance requirements and service levels.</li><li>SI is responsible for sizing and procuring the necessary hardware and software licenses as per the performance requirements. During the warranty period SI shall replace or augment or procure higher-level new equipment or additional licenses/hardware at no additional cost to the TNUHDB in case the procured hardware or software is not enough or is undersized to meet the service levels and the project requirements.</li><li>Mean Time Between Failures (MTBF) - If during contract period, any equipment has a hardware failure on four or more occasions in a period of less than three months or six times in a period of less than twelve months, it shall be replaced by equivalent or higher-level new equipment by the SI at no cost to TNUHDB.</li><li>During the warranty period SI shall maintain the systems and repair/replace at the installed site, at no charge to TNUHDB, all defective components that are brought to the SI&#39;s notice.</li><li>In case any hard disk drive of any server, SAN, or client machine is replaced during warranty/AMC, the unserviceable HDD will be property of TNUHDB and will not be returned to SI.</li><li>The SI shall carry out Preventive Maintenance (PM), including cleaning of interior and exterior, of all hardware and testing for virus, if any, and should maintain proper records at each site for such PM. Failure to carry out such PM will be a breach of warranty and the warranty period will be extended by the period of delay in PM. The PM should be carried out at least once in six months as per checklist and for components agreed with TNUHDB.</li><li>The SI shall carry out Corrective Maintenance for maintenance/troubleshooting of supplied hardware/software and support infrastructure problem including network (active/passive) equipment, security, and rectification of the same. The SI shall also maintain complete documentation of problems, isolation, cause, and rectification procedures for building knowledge base for the known problems in centralized repository, accessible to TNUHDB team as well.</li><li>The SI shall monitor warranties to check adherence to preventive and repair maintenance terms and conditions.</li><li>The SI shall ensure that the warranty complies with the agreed technical standards, security requirements, operating procedures, and recovery procedures.</li><li>The SI shall have to stock and provide adequate onsite and offsite spare parts and spare component to ensure that the uptime commitment as per SLA is met.</li><li>The SI shall ensure that the onsite list of spares is assigned only for TNUHDB infrastructure and that this list of onsite spares is made available to TNUHDB and updated on monthly basis</li><li>Any component that is reported to be down on a given date should be either fully repaired or replaced by temporary substitute (of equivalent configuration) within the time frame indicated in the Service Level Agreement (SLA).</li><li>The SI shall introduce a comprehensive Assets Management process &amp; appropriate tool to manage the entire lifecycle of every component of TNUHDB Information Portal.</li><li>For Peripheral Equipment&rsquo;s<ol><li>The SI needs to ensure to provide support for all the support Equipment&rsquo;s. In case any of the device models, peripheral or software components becomes obsolete, the SI shall offer new item/model, software with the same make and or higher specification at no additional cost. The proposed devices/peripherals should comply with the STQC Guidelines and shall be offered to the department for evaluation and acceptance. The SI shall provide technical document and manpower support to enable the department in evaluation process.</li></ol></li></ol><ol><li><ol><li>The SI shall ensure stock maintained is enough to ensure timely replacement of faulty devices within the defined SLA. In case of any delay in the repair/ replacement of respective device, a penalty shall be imposed on the SI for each incident. SI shall be required to certify such availability of the stock of Network devices in good and running conditions on monthly basis to TNUHDB department.</li><li>The SI shall perform Preventive Maintenance of all equipment supplied on quarterly basis for up keeping proper functioning of the devices/items supplied under the present agreement and certify that all the Network devices are found to be tamper proof and comply with specifications and requirements of the scope of the RFP. The department officials shall counter sign all the certificates/reports.</li><li>The SI may have to deploy additional manpower for smooth functioning of the project and at no extra cost to meet the SLA&rsquo;s</li><li>The SI shall be responsible for Fixing bugs/ issues, functionality enhancements, patches to cater changes (including tax, legal, statutory and policy requirements), modification or enhancement to existing business processes, changes to organizational structure, configurations, and customizations.</li><li>The SI shall ensure the availability of the technical support from the OEM for all peripheral equipment which includes &ndash; Network devices, Video wall Network Setup Devices throughout the period of contract.</li></ol></li></ol><p>Maintenance of IT Infrastructure:</p><ol><li>Management of Servers, Network Infrastructure, Experience Centre, and Kiosk</li></ol><ol><li>SI need to deploy requisite mix of L1, L2 and L3 resources (on 24X7 basis) for management of entire TNUHDB Systems including IT infrastructure deployed at Experience Centre, NOC</li><li>In its technical bid SI need to provide details of its team deployed at each site along with the category/roles and number of resources planned (with SI and outside), experience and skills, to be deployed at each site.</li><li>All the L1 and L2 resources proposed for the project need to be dedicated for the TNUHDB project.</li><li>TNUHDB may ask for security verification (Police verification) of every resource deployed on the project and SI need to comply the same before deployment of the resource at the project.</li><li>At all times, the SI need to maintain the details of resources deployed for the project to TNUHDB and keep the same updated. A detailed process in this regard will be finalized between TNUHDB and SI. The SI shall maintain an attendance register for the resources deployed Attendance details of the resources deployed also need to be shared with TNUHDB on monthly basis. TNUHDB reserves the right to interview resources deployed for Operations and maintenance and assess the suitability of the resource for the role. In case a resource is not found suitable, SI will change the resource on request of TNUHDB. SI shall comply with this.</li><li>The dedicated team for TNUHDB shall be based at the Head Office of TNUHDB. The shared team of senior resources may operate out of SI&rsquo;s remote delivery centres or any other office. The SI shall provide all such estimations to TNUHDB. In case of any travelling requirements of shared senior resources to DC/DR for TNUHDB, the same shall be at SI&rsquo;s expense. For any remote based support, the SI must ensure the same is done over a secured TNUHDB link. All accesses by any resources should be controlled, managed, and logged.</li><li>The scope of work for infrastructure and maintenance includes the following:<ol><li>DC/DR operations to be in compliance with industry leading ITSM frameworks like ITIL, ISO 20000 &amp; ISO 27001</li><li>Ensure compliance to relevant SLA&rsquo;s and KPI&rsquo;s</li><li>24x7 monitoring &amp; management of availability &amp; security of the infrastructure and assets</li><li>Perform regular hardening, patch management, testing and installation of software updates issued by OEM/vendors from time to time after following agreed process</li><li>Daily maintenance of system configuration</li><li>Day-to-day disk space management</li><li>Tracking the servers&rsquo; performance taking remedial and preventive actions in case of problems</li><li>Proper upkeep of storage media for taking backups</li><li>Ensure overall security &ndash; ensure installation and management of every security component at every layer including physical security</li><li>Prepare documentation/policies required for certifications included in the scope of work</li><li>Preventive maintenance plan for every quarter</li><li>Performance tuning of system as required</li><li>Design and maintain Policies and Standard Operating Procedures</li><li>User access management</li><li>Other activities as defined/to meet the project objectives</li><li>Implementation and maintenance of standard operating procedures for the maintenance of the IT infrastructure</li><li>Updation of all Documentation.</li></ol></li><li>During operations phase the SI needs to submit proof of renewal of support for all IT infrastructure products and other system software&rsquo;s for whom it is mandated to have OEM support. This needs to be submitted on an annual basis and needs to be verified before release of 2nd quarter payment of each year.</li><li>SI shall be responsible for managing the usernames, roles, and passwords of all the relevant subsystems, including, but not limited to servers, other devices, etc. SI shall be required to set up the directory server or use the existing directory server. Logs relating to access of system by administrators shall also be kept and shall be made available to TNUHDB on need basis.</li><li>SI shall implement a password change mechanism in accordance with the security policy formulated in discussion with TNUHDB and based on the industry best practices/frameworks like ISO 27001, ISO 20000 etc.</li><li>The administrators shall also be required to have experience in latest technologies to provision the existing and applicable infrastructure on a requirement-based scenario.</li></ol><ol><li><strong>System </strong><strong>Administration</strong></li></ol><ol><li>24*7*365 monitoring and management of the Network Devices &amp; other IT Infrastructure.</li><li>SI shall also ensure proper configuration of server parameters and performance tuning on regular basis. SI shall be the single point of accountability for all hardware maintenance and support the ICT infrastructure. It should be noted that the activities performed by the SI may be reviewed by TNUHDB.</li><li>SI shall be responsible for operating system administration, including but not limited to management of users, processes, preventive maintenance, and management of upgrades including updates, upgrades, and patches to ensure that the system is properly updated.</li><li>SI shall also be responsible for installation and re-installation of the hardware(s) as well as the software(s) in the event of system crash/failures.</li><li>SI shall also be responsible for proactive monitoring of the applications hosted</li><li>SI shall appoint system administrators to regularly monitor and maintain a log of the monitoring of servers to always ensure their availability to TNUHDB.</li><li>TNUHDB shall undertake regular analysis of events and logs generated in all the sub systems including but not limited to servers, operating systems, and others. The system administrators shall undertake actions in accordance with the results of the log analysis. The system administrators shall also ensure that the logs are backed up and truncated at regular intervals. SI shall refer to CERT-In Guidelines to ensure their alignment with the practices followed.</li><li>The system administrators shall adopt a defined process for change and configuration management in the areas including, but not limited to, changes in servers, operating system, applying patches, etc.</li><li>The system administrators shall provide hardening of servers in line with the defined security policies. Validation of hardening configuration will be carried out quarterly and deviations must be tracked through SLA reporting</li><li>The system administrators shall provide integration and user support on all supported servers, data storage systems, and others.</li><li>The system administrators shall provide directory services such as local LDAP services and DNS services and user support on all supported servers, data storage systems etc.</li><li>The system administrators shall be required to trouble shoot problems with web services, application software, server relationship issues and overall aspects of a server environment like managing and monitoring server configuration, performance and activity of all servers.</li><li>The system administrators should be responsible for documentation regarding configuration of all servers, IT Infrastructure etc.</li><li>The system administrators shall be responsible for managing the trouble tickets, diagnosis of the problems, reporting, managing escalation, and ensuring rectification of server problems as per SLA defined in appropriate section</li><li>The administrators will also be required to have experience in latest technologies so as to provision the existing and applicable infrastructure on a requirement-based scenario.</li></ol><p>&nbsp;</p><p>&nbsp;</p><ol><li><strong>Network monitoring</strong></li></ol><ol><li>SI shall provide services for management of network environment to maintain performance at optimum levels on a 24 x 7 basis. It should be noted that the activities performed by the SI may be reviewed by TNUHDB.</li><li>SI shall be responsible for monitoring and administering the network at TNUHDB Head office and at Remote offices.</li><li>SI shall design of Network Administration or monitoring Policy and getting it approved from TNUHDB for effective and efficient management of Network resources. Network Administration, consists broadly of the following activities:<ol><li>Network devices&rsquo; configuration, management and tuning for optimum performance</li><li>Tracking the network status, Availability and taking remedial and preventive actions in case of problems.</li><li>Network fault isolation and resolution</li><li>Monitoring of network performance and escalation of performance deterioration to concerned authorities and taking remedial actions to resolve such issues.</li><li>Real time monitoring and deployment of network security measures 24*7*365</li><li>Documentation related to network configuration, routing policies, IP addressing schema etc.</li><li>Bandwidth monitoring and trending for the network</li></ol></li><li>SI shall be responsible for creating and modifying VLAN, assignment of ports to appropriate applications and segmentation of traffic.</li></ol><p>&nbsp;</p><ol><li><strong>Security Management</strong></li></ol><p>The SI shall be responsible for implementing measures to ensure complete security of the TNUHDB Project solutions (including its entire environment) and confidentiality of the related data, in conformance with the security policy of GoTN/GoI/any other policy.</p><p>The SI shall constantly monitor the TNUHDB systems for events or activities, which might compromise (fraudulently or accidentally) the confidentiality, integrity, availability, and security of the system and take necessary remedial and preventive measures. This monitoring shall be through the security controls including:</p><ol><li>Real-time intrusion detection tools</li><li>Audit review tools</li><li>Manual processes</li></ol><p>The SI shall have to ensure the following:</p><ol><li>Regular hardening and patch management of components of the TNUHDB systems as agreed with TNUHDB</li><li>Performing security services on the components that are part of the TNUHDB environment as per security policy finalized with TNUHDB</li><li>IT Security Administration &ndash; Manage and monitor safety of information/data</li><li>Reporting security incidents and resolution of the same</li><li>Proactively monitor, manage, maintain &amp; administer all security devices and update engine, signatures, and patterns as applicable.</li><li>Managing and monitoring of anti-virus, anti-malware, phishing, and malware for managed resources.</li><li>Ensuring 100 percent antivirus coverage with patterns not old more than period agreed on any given system</li><li>Reporting security incidents and co-ordinate resolution</li><li>Monitoring centralized pattern distribution (live update) and scan for deficiencies</li><li>Maintaining secure domain policies</li><li>Secured IPsec/SSL/TLS based virtual private network (VPN) management</li><li>Performing firewall management and review of policies on at least quarterly basis during first year of O&amp;M and then after at least on half-yearly basis</li><li>Resolution of calls for security notifications, system alerts, vulnerabilities in hardware/software and alerting TNUHDB as appropriate</li><li>Performing patch management using software distribution tool for all security applications including content management system, antivirus, and VPN</li><li>Providing root cause analysis for all defined problems including hacking attempts</li><li>Monthly reporting on security breaches and attempts plus the action taken to thwart the same and providing the same to TNUHDB</li><li>Maintaining documentation of security component details including architecture diagram, policies, and configurations</li><li>Performing periodic review of security configurations for inconsistencies and redundancies against security policy</li><li>Performing periodic review of security policy and suggest improvements</li><li>Reviewing logs daily of significance such as abnormal traffic, unauthorized penetration attempts, any sign of potential vulnerability. Security alerts and responses. Proactive measures in the event a problem is detected</li><li>Policy management (firewall users, rules, hosts, access controls, daily adaptations)</li><li>Modifying security policy, routing table and protocols</li><li>Performing zone management (DMZ)</li><li>Sensitizing users to security issues through regular updates or alerts - periodic updates/Help TNUHDB issuance of mailers in this regard</li><li>Performing capacity management of security resources to meet business needs</li><li>Rapidly resolving every incident/problem within mutually agreed timelines</li><li>Testing and implementation of patches and upgrades</li><li>Network/device hardening procedure as per security guidelines from TNUHDB</li><li>Implementing and maintaining security rules</li><li>Performing any other day-to-day administration and support activities</li><li>Maintaining strict privacy and confidentiality of all the data it gets access to. Adequate provisions to be made not to allow unrestricted access to the data. The SI shall not give access to data to people in the organization who have not signed the NDA. SI cannot sell or part with any data in any form</li><li>Producing and maintaining system audit logs on the system for a period agreed by the SI and TNUHDB, at which point they will be archived and stored at an off-site location or as desired by TNUHDB. The SI shall regularly review the audit logs for relevant security exceptions.</li></ol><ol><li><strong>OEM Support Services</strong></li></ol><p>Involving the OEMs of the critical components (hardware and software) to ensure that installations/ configurations/ integrations of the various components are performed according to the best practices/ OEM guidelines and seeking the professional support of the OEMs during any contingency is a key requirement</p><p>The SI shall ensure requisite support from the OEM for various aspects of project including configuration, customization, sizing, performance tuning and implementation support.</p><ol><li>The SI shall, before the commissioning of the system shall provide for teaming agreement between SI and the respective OEM which provides for professional support services of the OEM during the contract period.</li><li>The SI shall assess the requirement of professional services from OEMs for all components of the solution, and provision for requisite support from OEMs. The SI shall provision onsite professional services support including consulting services from the OEM or its consulting unit (for database, software, security, portal, reporting, BI, OS in the manner.</li><li>The SI shall facilitate bi-annual workshops with OEMs to discover, discuss, select, and implement best practices for OEMs products into the solution. Workshops will include review of existing configuration.</li><li>The SI shall ensure that there is 24x7 support from the OEMs of all the components which will be proposed by SI.</li><li>The SI shall give an un-priced break-up of the professional services support procured and its nature from the OEMs as part of the technical bid.</li><li>The SI shall take adequate steps to ensure that none of the IT Infrastructure proposed is declared &ldquo;End-of-Sale&rdquo; by the respective OEM in next 1 year as on date of submission of Bid or at any time during the contract. In case it happens, SI shall replace the component with equivalent or better component and ensure that there is no impact on the operations and performance.</li><li>The system software licenses mentioned in the Bill of Materials shall be genuine, perpetual, full use and should provide upgrades, patches, fixes, security patches and updates directly from the OEM. All the licenses and support (updates, patches, bug fixes, etc.) should be in the name of TNUHDB.</li><li>The SI shall warrant that the infrastructure procured for project have no defects arising from design or workmanship or any act of omission and must provide a declaration for the same from all the OEM for equipment that would be supplied at project site of TNUHDB. The warranty shall remain valid for at least one year beyond the service period of the contract for all hardware, software and other components comprising of the solution. The SI will ensure warranty in case of an extension.</li></ol><ol><li><strong>Other Activities</strong></li></ol><ol><li>SI shall ensure that it prepares configuration manual for OS, appliances, middleware, all tool, servers/devices and all equipment&rsquo;s and the same need to be submitted to TNUHDB, any changes in the configuration manual need to be approved by TNUHDB. Configuration manual to be updated periodically.</li><li>SI shall maintain data regarding entitlement for software upgrades, enhancements, refreshes, replacements, and maintenance.</li><li>If the Operating System or additional copies of Operating System are required to be installed/reinstalled/un-installed, the same should be done as part of O&amp;M.</li><li>SI should carry out any requisite adjustments/changes in the configuration for implementing different versions of Application Software.</li><li>Escalation and co-ordination with other vendors/sub vendors for problem resolution wherever required</li><li>Updates/Upgrades/New releases/new versions: The SI shall provide from time to time the Updates/Upgrades/new releases/new versions of the software and operating systems as required. The SI should provide free upgrades, updates &amp; patches of the software and tools to TNUHDB as and when released by OEM.</li><li>Whenever a component must be replaced because of technical, functional, manufacturing or any other problem, it shall be replaced with a component of the same make and configuration. In case the component of same make and configuration is not available, the replacement shall conform to open standards and shall be of a higher configuration specifically approved by TNUHDB.</li><li>SI shall provide patches to the software as part of IT infrastructure, operating system, databases, and other applications.</li><li>Software License Management: The SI shall provide for software license management and control. SI shall maintain data regarding entitlement for software updates, enhancements, refreshes, replacements, and maintenance.</li><li>Disaster Recovery management services</li><li>All other activities required to meet the project requirements and service levels.</li></ol><p>It is responsibility of the SI to scale up the Operations &amp; Maintenance (O&amp;M) team as and when required to ensure smooth project execution throughout the project duration.</p><p>&nbsp;</p><ol><li><ol><li><ol><li>Compliance to SLA</li></ol></li></ol></li></ol><p>&nbsp;</p><ol><li>Requirements</li></ol><p>SI shall ensure compliance to uptime and performance requirements of project solution as indicated in the SLA table of RFP and any upgrades/major changes to the TNUHDB Project shall be accordingly planned by SI for ensuring the SLA requirements.</p><ol><li>SLA Measurement</li></ol><p>SI shall be responsible for measurement of the SLAs at the TNUHDB System level as well as at the user level with the help of the enterprise monitoring tool on a periodic basis.</p><ol><li>Reporting</li></ol><p>Reports for SLA measurement must be produced TNUHDB officials as per the project requirements.</p><ol><li>Software Licenses</li></ol><p>Bidder to refer following list of software licenses which are indicative and may vary as per actual requirement. Bidder shall choose latest versions of software whichever is best fit for their requirement.</p><p>Bidder shall submit all licenses to TNUHDB in soft or paper format during handover</p><table cellspacing=\"0\"><thead><tr><td style=\"background-color:#4472c4; border-color:#4472c4; height:37.75pt; width:35.75pt\"><p><strong>Sr No</strong></p></td><td style=\"background-color:#4472c4; height:37.75pt; width:198.45pt\"><p><strong>Software components </strong></p></td><td style=\"background-color:#4472c4; height:37.75pt; width:122.9pt\"><p><strong>Type of License </strong></p></td><td style=\"background-color:#4472c4; border-color:#4472c4; height:37.75pt; width:110.4pt\"><p><strong>No of license</strong></p></td></tr></thead><tbody><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:28.85pt; width:35.75pt\"><p><strong>1</strong></p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:198.45pt\"><p>Server OS e.g., Windows Servers, RHEL, Linux, any other as per requirement.</p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:28.85pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:27.05pt; vertical-align:top; width:35.75pt\"><p><strong>2</strong></p></td><td style=\"height:27.05pt; vertical-align:top; width:198.45pt\"><p>Workstation OS e.g., Windows 10/11, as per system requirement</p></td><td style=\"height:27.05pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:27.05pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:21.65pt; width:35.75pt\"><p><strong>3</strong></p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:198.45pt\"><p>Endpoint Security Agent/Antivirus</p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:21.65pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:27.95pt; vertical-align:top; width:35.75pt\"><p><strong>5</strong></p></td><td style=\"height:27.95pt; vertical-align:top; width:198.45pt\"><p>Enterprise Monitoring System Software</p></td><td style=\"height:27.95pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:27.95pt; vertical-align:top; width:110.4pt\"><p>10 end users</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:37.75pt; width:35.75pt\"><p><strong>7</strong></p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:198.45pt\"><p>Helpdesk Software for Tech Support &amp; Portal Support (Support team &amp; team leader/admin)</p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:37.75pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:28.85pt; vertical-align:top; width:35.75pt\"><p><strong>8</strong></p></td><td style=\"height:28.85pt; vertical-align:top; width:198.45pt\"><p>Load balancer, NIPS or any other security component</p></td><td style=\"height:28.85pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:28.85pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:27.05pt; width:35.75pt\"><p><strong>9</strong></p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:198.45pt\"><p>Network Management System Software</p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"background-color:#d9e2f3; height:27.05pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:12.65pt; vertical-align:top; width:35.75pt\"><p><strong>10</strong></p></td><td style=\"height:12.65pt; vertical-align:top; width:198.45pt\"><p>Citizen Web portal Application / TNUHDB Portal Application</p></td><td style=\"height:12.65pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:12.65pt; vertical-align:top; width:110.4pt\"><p>Unlimited</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:23.45pt; width:35.75pt\"><p><strong>11</strong></p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:198.45pt\"><p>Citizen Mobile Application/ NUHDB Mobile Application</p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:23.45pt; width:110.4pt\"><p>Unlimited</p></td></tr><tr><td style=\"border-color:#8eaadb; height:7.25pt; vertical-align:top; width:35.75pt\"><p><strong>12</strong></p></td><td style=\"height:7.25pt; vertical-align:top; width:198.45pt\"><p>BI &amp; Analytics Tool</p></td><td style=\"height:7.25pt; vertical-align:top; width:122.9pt\"><p>Subscription Based for Contract Period</p></td><td style=\"height:7.25pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:9.05pt; width:35.75pt\"><p><strong>13</strong></p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:198.45pt\"><p>GIS Mapping Tool</p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:9.05pt; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"border-color:#8eaadb; height:18.5pt; vertical-align:top; width:35.75pt\"><p><strong>14</strong></p></td><td style=\"height:18.5pt; vertical-align:top; width:198.45pt\"><p>Project management System</p></td><td style=\"height:18.5pt; vertical-align:top; width:122.9pt\"><p>Perpetual</p></td><td style=\"height:18.5pt; vertical-align:top; width:110.4pt\"><p>As required</p></td></tr><tr><td style=\"background-color:#d9e2f3; border-color:#8eaadb; height:12.65pt; width:35.75pt\"><p><strong>15</strong></p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:198.45pt\"><p>Enterprise Resource Planning</p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:122.9pt\"><p>Perpetual</p></td><td style=\"background-color:#d9e2f3; height:12.65pt; width:110.4pt\"><p>As required</p></td></tr></tbody></table><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>Annexure VII - Governance Structure and Responsibility</strong></p><ol><li><ol><li><ol><li>Project Leadership Team</li></ol></li></ol></li></ol><p>The Project Leadership Team is the senior management team, which shall provide a tactical and strategic direction for the overall project. The team would discharge the following responsibilities:</p><ul><li>Ensuring commitment to the project is present at every level in the organization</li><li>Empower the Project In-charge/Project Director for management of all the operations related to the project</li><li>Issuing of circulars, instructions, etc. to effect changes to existing roles and responsibilities of employees, the adoption of reengineered processes in participating divisions / constituent organizations and such other matters as may be necessary from time to time</li><li>Ensuring the change in policy wherever required, if feasible</li><li>Ensuring that all the divisions and constituent organizations take active part in the project</li><li>Redefining/ refining the objectives, goals of the project</li><li>Ensuring the financial commitment to the project</li><li>Project monitoring and evaluation based on the inputs provided by the Project management group</li></ul><p>&nbsp;</p><ol><li><ol><li><ol><li>Project Implementation Committee (PIC)</li></ol></li></ol></li></ol><p>The PIC shall be responsible for ensuring the overall effectiveness of the implementation of the project and is the central repository for all status reporting to the leadership team. To achieve consistency and accuracy across the project, all implementation initiatives should comply with the project tracking and control requirements as may be defined by the PIC. The Project Management Consultant (PMC) shall be presenting the project progress to PIC.</p><p>&nbsp;</p><p>World Bank</p><p>As the Project In-charge responsible for the overall success of the project, the role in the successful implementation of the project includes discharging the following responsibilities:</p><ul><li>Setting overall policy, provide strategic guidance and leadership</li><li>Managing project administration and overall project issue &amp; risk management</li><li>Developing and maintaining a high-performance project culture</li><li>Intervene as appropriate to facilitate smooth progress of the project</li><li>Review of performance of the vendors and stakeholders and undertake corrective actions to achieve the project objectives</li><li>Coordinate with all the stakeholders and third-party agencies, vendors involved in the Project</li><li>Reporting project progress, successes, issues and risks to the leadership team and support in taking corrective actions, where necessary</li><li>Project communications management</li><li>Approve recommendations and action plans</li></ul><p>&nbsp;</p><p>PIC Team</p><p>&nbsp;</p><p>The PIC team comprises of the officers from the TNUHDB, Administration and IT Systems personnel. The key responsibilities of the PIC team are:</p><ul><li>Shall be responsible for ensuring the appropriate functionality and outcomes are achieved for the System and assisting with reviews and signoff of project deliverables</li><li>Shall be responsible for ensuring that the System and sub-systems developed under this project adhere to the technical standards and best practices during design, development, implementation and operations phase</li><li>Shall help in coordination with TNUHDB and other stakeholders for project implementation</li><li>Shall review and approve key project outputs</li><li>Shall assist in providing resources for development of project outputs</li><li>Shall be responsible for communicating between the top management and the project team members</li><li>Help in resolution of project issues</li><li>Monitor the effectiveness of the programs, incorporate the learnings, and redefine the change &amp; capacity building programs etc.</li><li>Shall review and certify the deliverables submitted in all the phases of the project acceptance testing and implementation</li><li>Shall also coordinate with other agencies to ensure smooth implementation/integration of the system</li><li>Responsible for guiding the team&rsquo;s activities concerning stakeholder management, communications, benefits realization, process improvement</li><li>Shall measure, monitor, and report the non-technical SLAs (e.g., turnaround time for implementation of Digitalization, TNUHDB Information Portal, and Mobile app. Monitor the solution performance, functionality, availability, identification of areas of improvements</li></ul><p>Project Coordination Team</p><ul><li>Shall arrange to send formal communication to TNUHDB and other stakeholders for their availability to discuss requirement discussion and operational challenges</li><li>Shall coordinate with PMC team on day-to-day basis to close monitoring of the project</li><li>Shall provide technical inputs for existing application and IT Infrastructure to PMC team</li><li>Shall review the project outputs and provide timely feedback and approval</li><li>Shall provide clarifications on queries raised by PMC</li><li>Shall review the project activities on daily and weekly/monthly basis</li></ul><p>&nbsp;</p><p>Project Management Consultant (PMC)</p><p>The PMC team will assist in Project Implementation, SLA Monitoring, review the performance of the application Solution, IT infrastructure requirements and review the SLA&rsquo;s between different stakeholders. The PMC will be responsible to perform the following tasks:</p><ol><li>Project Management<ol><li>Coordinate with project stakeholders during the implementation phase</li><li>Review the following development phase documentation submitted by System Integrators (SI)<ol><li>SRS</li><li>HLD</li></ol></li><li>Monitor the following development activities of the SI<ol><li>Design and development of solutions</li><li>Scanning and digitization activities</li><li>Deployment of hardware solution, network solution, hosting services, security features, etc.</li></ol></li><li>Assist the department in the User Acceptance Testing (UAT)</li><li>Identify implementation challenges, dependencies, and integration issues</li><li>Monitoring project implementation &amp; project work outputs timeline and Service Level Agreement (SLA)</li><li>Assistance in coordination with SI/vendor for Security Audit</li><li>Assist in planning and monitoring capacity building activities by assisting the departments in selection of training agency/ vendors as per need of the department.</li><li>Status Report and Monitoring</li><li>Preparing and submitting all progress reports, including quarterly reports, annual reports, and project completion report to the leadership team.</li></ol></li></ol><p>&nbsp;</p><p>Systems Integrator (SI)/ Vendor</p><p>The Implementation Agency/ Systems Integrator (SI) will be responsible to perform the following tasks:</p><ul><li>System requirements study and system design</li><li>Scanning and Digitization of materials of TNUHDB</li><li>Design, Develop, Supply, Commission, Implement and Maintain TNUHDB Portal (web &amp; mobile) with the key solutions/modules as mentioned in Chapter 4 and from the existing TNUHDB website http://tnuhdb.gov.in/;</li><li>Design, Develop, Supply, Commission, Implement and Maintain Mobile application to make available required features of TNUHDB Information portal through the TNUHDB mobile application</li><li>Preparation of SRS, HLD, LLD, RTT, Unit Test cases</li><li>Drawing out specifications for DC and DR Infrastructure (specifications for required Hardware, Software &amp; Networking infrastructure) for hosting the TNUHDB Information Portal and Mobile Application at in house server room and/or cloud hosting platform</li><li>Commissioning of IT hardware &amp; network including LAN, DC and DR</li><li>Approval from third party agency for the application/security audit of the developed applications and infrastructure</li><li>Change Management Support including training of users for effectively using the system in each phase of implementation</li><li>Operations and Maintenance of the developed solution for a specified period from the date of Go-Live</li><li>Documentation of the project</li><li>Make available web-based tools to the department for Project Management and Monitoring during development and implementation period and web-based tools for Evaluation and SLA Monitoring during O&amp;M period.</li><li>Periodical update (after formatting and checking) of the correct data as provided by TNUHDB officials, to the portal and mobile applications</li><li>Establishment and management of Helpdesk Operations for TNUHDB Information Portal</li><li>Address the ongoing needs of Security Management including, Monitoring and Management of various devices / tools such as Firewall, SIEM Tool, Intrusion Prevention System, Content Filtering and URL Blocking, Virus Protection, Load Balancer, DMZs, VLANs, Proxy and vulnerability protection through implementation of proper patches and rules as per best practices</li><li>Development/Customization and implementation of Preparing and submitting all reports, including quarterly reports, annual reports, and project Status report</li><li>Maintain updated project documentation including but not limited to design documents, Technical &amp; User manuals for the entire solution</li><li>Exit management support at the end of O&amp;M period.</li></ul><p>&nbsp;</p><p>&nbsp;[Deloitte1]<strong>Comment received from World Bank</strong>: During previous discussion, we had provided options regarding the execution of civil work, furnishing of office, procurement of hardware, etc No indication in the Excel Sheet is made on these so we are not able to comment on whether these have been adequately addressed</p><p>&nbsp;</p><p><strong>Comment Addressed</strong>: Hence we have addressed this point and have added to the ToR</p><p>&nbsp;</p><p>&nbsp;[Deloitte2]<strong>World Bank Comments:</strong></p><p>However, we would like to emphasize that all infrastructure-related permissions, including those for LAN and WLAN, should be managed by the selected vendor with support from TNUHDB; we would like to recommend that this be added to the ToR. This will ensure that we adhere to the best technical standards and comply with all regulatory requirements without overburdening TNUHDB&#39;s internal resources<strong> </strong></p><p>&nbsp;</p><p><strong>Comment Addressed: </strong>The infrastructure related permissions to be managed by the vendor has been mentioned across the chapter: Objective and in sections Annexure-I to Annexure-IV of this ToR</p><p>&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>"},{"id":"OP00260797","notice_type":"Request for Expression of Interest","noticedate":"01-Dec-2023","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2023-12-14T00:00:00Z","submission_deadline_time":"17:00","project_ctry_name":"Tajikistan","project_id":"P171382","project_name":"Tajikistan Digital Foundations Project","bid_reference_no":"TDFP/CS/CQS-07","bid_description":"Development of Terms of Reference for procurement of ICT equipment and supervision of its installation for SUE \"Smart City\" Data Center","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"3, Academic Rajabovs ave, Dushanbe","contact_ctry_name":"Tajikistan","contact_email":"j.sattorzoda@piumof.tj","contact_name":"Jamshed Sattorzoda","contact_organization":"STATE INSTITUTION \"Project Implementation Unit for Access to Green and Rural Development Finance\"","contact_phone_no":"992372216184","contact_web_url":"www.minfin.tj","submission_date":"2023-12-01T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p>Tajikistan</p><p>TAJIKISTAN DIGITAL FOUNDATIONS PROJECT</p><p>Loan No./Credit No./ <u>Grant No</u>.: P171382</p><p>Assignment Title: Consultancy services to develop Terms of Reference for Procurement of ICT equipment and supervision of its installation for SUE &ldquo;Smart City&rdquo; Data Centre</p><p>Reference No. (as per Procurement Plan): TDFP/CS/CQS-07</p><p>The Ministry of Finance of the Republic of Tajikistan has received project preparation advance (PPA) out of the WBG Project Preparation Facility for the preparation of the Tajikistan Digital Foundation Project, and intends to apply part of the proceeds toward payments under the consultancy contract to develop Terms of Reference for Procurement of ICT equipment and supervision of its installation for SUE &ldquo;Smart City&rdquo; Data Centre.</p><p>The objectives of this assignment are the following:</p><ol><li>Audit of existing data centers, server rooms and other data hosting infrastructures in the public sector in the Republic of Tajikistan;</li><li>Identification of the primary data center and the disaster recovery site that will be used to host information systems and digital services developed under the Tajikistan Digital Foundations project;</li><li>Development of a plan for the modernization of the primary and disaster recovery data center and TORs for the purchase of equipment, software and services necessary to upgrade the infrastructure of the primary and disaster recovery site, in accordance with project needs;</li><li>Supervision of installation and commissioning of equipment.</li></ol><p>The qualified consulting (herein after referred to as &ndash; the Consultant) is expected to conduct the following activities. The list of specific tasks of the consultant includes the following:</p><ol><li><strong>Audit of existing data centers and identification of the primary data center and disaster recovery sites</strong></li></ol><p>For each of the data center(s) included in the short list (designed in accordance with point b. of the General requirements), the Consultant will conduct a detailed audit to assess their suitability. The audit will consider, among other things, the following aspects:</p><ol><li>Physical Infrastructure: Inspect the physical infrastructure, including building integrity, power, cooling systems, fire suppression, physical security measures, and facility maintenance levels.</li><li>Capacity Analysis: Estimate the total capacity of each facility, including floor space, rack space, power supplies, cooling, and how they can be utilized.</li><li>Network Infrastructure: An overview of network infrastructure to understand connectivity, throughput, latency, reliability, redundancy, and network security measures.</li><li>Hardware: Detailed inventory and condition Assess IT hardware, including servers, storage devices, network devices, and more.</li><li>Software: An audit of software used in hosting environments, including operating systems, database management systems, virtualization platforms, and other application software and the associated licenses.</li><li>Performance: Performance evaluation including uptime, speed, latency, and other relevant parameters.</li><li>Resiliency and Redundancy: An overview of available resiliency and redundancy measures, including redundant power, network redundancy, hardware redundancy, and data backup systems.</li><li>Physical and cyber security: A comprehensive Assess physical and cyber security measures to protect data and infrastructure.</li><li>Operational efficiency: Evaluation of operational efficiency measures, including energy efficiency, workload management, staffing, availability of network/system operations centers and support services&nbsp; &nbsp; <strong>2.</strong>&nbsp;<strong>Prepare the ToRs for a system integrator;&nbsp;</strong><strong>Preliminary work</strong></li></ol><p>When developing TOR for a system integrator for a data center, the consultant must develop the requirements for the infrastructure, equipment, software, and systems of the primary and disaster recovery data center(s). This includes, but is not limited to, the following aspects:</p><ol><li>Describe the current state of the data center: Determine the current state of the data center, its architecture, cooling and power systems, network infrastructure, security, and other key aspects.</li><li>Goals and requirements: Definition of goals and requirements shall be achieved, through equipping and refining the data center.</li><li>Determine the goals of the project and its contribution to the overall strategy of the organization.</li><li>Identify requirements for performance, fault tolerance, scalability, and security of the data center.</li><li>Determine the need to comply with Uptime Institute standards.</li><li>Determine requirements for energy efficiency, thermal load management and environmental sustainability.</li><li>Account for the requirements for high availability and continuity of data center systems.</li><li>Determine the need to comply with data protection and confidentiality requirements.</li><li>Determine requirements for monitoring, management and administration of the data center.</li><li>Develop requirements for infrastructure, hardware, software and data center systems.</li><li>Determine requirements for the budget, timing and resources of the project.</li><li>Identify the hardware components of the situational center (data display system, telecommunications system, video conferencing, sound systems and conference systems, interactive displays or interactive whiteboards, power supply and backup power supply system, access control system, integrated control systems.)</li><li>Identify the telecommunication system for the Situation Center (Internet and intranet, IP-telephony, telephony, video conferencing, communication channel with the automation system, video surveillance, etc.)</li><li><strong>Concept and architecture </strong></li><li>Develop the concept and architecture of the Tier III data center to meet the standards of the Uptime Institute.</li><li>Determine the required components, systems, and infrastructure for high availability and reliability.</li><li><strong>Infrastructure </strong></li><li>Cooling Systems: Determine cooling system requirements, including system type (e.g., direct, or indirect cooling), cooling capacity, energy efficiency and temperature control systems.</li><li>Power Systems: Determine requirements for power systems, including capacity, reliability (e.g., redundancy and back-up power), energy efficiency, load balancing, and monitoring systems.</li><li>Network Infrastructure: Define network infrastructure requirements, including bandwidth, reliability, network protocols, segmentation, and security.</li><li>Security systems: Determine requirements for security systems, including access control systems, video surveillance, fire safety, public address systems and alarms.</li><li><strong>Equipment and systems</strong></li><li>Server hardware: Determine server hardware requirements, including server types, processing power, memory, storage, and networking capabilities.</li><li>Storage: Determine storage requirements, including storage capacity, storage types, data redundancy, and scalability.</li><li>Network Equipment: Determine the requirements for network equipment, including switches, routers, firewalls, and other network devices.</li><li>Additional equipment: Determine requirements for additional equipment, such as backup systems, monitoring systems, control systems, and others.</li><li><strong>Software and licenses</strong></li><li>Operating Systems: Determine the requirements for the operating systems that will be used in the data center, including compatibility, licensing, and upgrades.</li><li>Management software: Determine software requirements for data center management, including monitoring systems, resource management, automation, and others.</li><li>Management software: Determine requirements for software for managing the Situation Center, including monitoring systems, resource management, automation, and others.</li><li><strong>Scalability and flexibility</strong></li><li>Scalability: Determine the scalability requirements for the data center infrastructure, including the ability to add new hardware and expand processing, storage and network capacity in the future and develop a data center scaling strategy to accommodate possible business growth and increased system load.</li><li>Flexibility and Adaptability: Determine infrastructure agility requirements to be ready for changes in technology, business needs, and customer requirements.</li><li><strong>Load distribution </strong></li><li>Define requirements for load balancing between servers, data storages and network equipment to ensure high availability and fault tolerance of the system.</li><li><strong>Redundancy</strong></li><li>Determine requirements for redundant components such as redundant power supplies, redundant cooling modules, redundant network switches, and other equipment to ensure continued operation of the data center in the event of a major component failure.</li><li><strong>Security and data protection</strong></li><li>Develop requirements for security and data protection, including physical security of the data center, protection against cyber-attacks and data backup.&nbsp;</li><li><strong>&nbsp; </strong></li><li><strong>Compliance and certification</strong></li><li>Tier III Standard: Determine the requirements for obtaining Tier III certification from the Uptime Institute, including compliance with data center design and construction standards, reliability, and availability.<strong>Monitoring and control</strong></li><li>System Monitoring: Determine requirements for monitoring systems, including monitoring of energy consumption, temperature, humidity, network traffic and other parameters.</li><li>Define mechanisms for monitoring and controlling the operation of the updated data center infrastructure, including performance tracking systems, collection of metrics, and regular data analysis</li><li>Resource Management: Define requirements for resource management systems, including management of servers, storage, network equipment, backups, and load balancing.</li><li><strong>Emergency planning and disaster recovery</strong></li><li>Emergency Planning: Determine requirements for emergency planning, including the Develop evacuation plans, fire drills, disaster recovery procedures, and backup systems.</li><li>Standby Power: Determine requirements for standby power systems, including standby power sources (e.g., generator sets), automatic transfer, and uninterruptible power systems (UPS).</li><li><strong>Network security</strong></li><li>External Threat Protection: Determine requirements for external threat protection systems, including traffic filtering, firewalls, intrusion detection systems (IDS) and intrusion prevention systems (IPS).</li><li>Insider Threat Protection: Determine requirements for insider threat protection systems, including access control, authentication and authorization systems, network segregation, and monitoring systems.</li><li><strong>Training and documentation </strong></li><li>Personnel Training: Determine personnel training requirements, including training on new equipment, control systems, safety procedures, and operational procedures.</li><li>Documentation: Define documentation requirements, including technical specifications, installation and operating instructions, network diagrams, service manuals, and backup procedures.</li></ol><ol><li><ol><li><strong>Prepare </strong><strong>the modernization plan</strong><strong> and</strong><strong> budget</strong></li></ol></li><li><strong>Cost </strong><strong>estimation</strong><strong> and budgeting</strong><ol><li><ol><li>Estimate the cost of equipping the Tier III data center, including a disaster recovery site, including the cost of equipment, infrastructure, construction, installation, and commissioning.</li><li>Develop project budget, determine financial constraints and align the project budget with the procurement plan.</li><li>Calculate life expectancy and forecast costs for maintenance, upgrades and replacement of equipment.</li></ol></li></ol></li><li><strong>Assess the economic</strong><strong> efficiency</strong></li></ol><ol><li>Evaluate the economic efficiency of a Tier III data center project, including the calculation of return on investment (ROI) and payback periods.</li><li>Perform a cost-benefit Analyze equipping a Tier III data center.</li></ol><ol><li><strong>Project implementation plan</strong></li></ol><ol><li>Develop a phased implementation plan for the modernization of the Tier III data center, and the disaster recovery site and define project stages, resources, deadlines, and responsibilities.</li><li>Determine a plan for the introduction of new equipment, including time frames, sequence of work, testing, including compliance with Uptime Institute requirements and integration with existing systems.</li><li>Establish control and reporting mechanisms during project implementation.</li><li>Identify and assess potential risks associated with data center refurbishment and develop strategies and plans to mitigate or manage them.</li></ol><ol><li><strong>Staffing and training </strong><strong>plan </strong></li></ol><ol><li>Determine the necessary personnel, skills, and knowledge required to operate the Tier III data center and the disaster recovery site.</li><li>Develop a staff training plan.</li></ol><ol><li><strong>Maintenance and support plan</strong></li></ol><ol><li>Develop a maintenance and support plan to support the operation of the Tier III data center after modernization.</li><li>Determine regular inspections, maintenance and contingency plans required to ensure continuous operation.</li></ol><ol><li><strong>Monitoring and management plan</strong></li></ol><ol><li>Define a monitoring and management system to monitor the operation of the Tier III data center, ensure high availability, and fault tolerance.</li><li>Establish metrics and indicators to evaluate the performance and quality of the data center.</li><li>Define a monitoring and management system to monitor the operation of the Situation Center, ensure high availability, and fault tolerance.</li></ol><ol><li><strong>Migration and integration plan</strong></li></ol><ol><li>Develop a migration and integration plan if the equipment and modification of the Tier III data center is carrying out on an existing infrastructure.</li><li>Determine the sequence of actions and risks associated with the transition to a new infrastructure.</li></ol><ol><li><strong>Social and environment plan</strong></li></ol><ol><li>Identify sociological factors that may influence the project.</li><li>Analyze the needs of users and employees, taking into account their preferences and expectations.</li><li>Develop strategies to ensure social satisfaction and acceptance of the project by stakeholders.</li><li>Assess the environmental impact of the project on the environment.</li><li>Identification of potential negative impacts such as energy consumption, emissions and waste disposal.</li><li>Develop strategies and measures to reduce the ecological footprint, including the use of energy efficient solutions, waste management and promotion of sustainable resource consumption.</li></ol><ol><li><strong>Energy efficiency plan</strong></li></ol><ol><li>Develop an energy efficiency plan, including energy optimization and consumption reduction.</li><li>Plan for implementation of energy-saving technologies and energy management systems to reduce operating costs and environmental impact.</li><li>Develop a strategy for introducing renewable energy sources into data center operations, such as solar or wind energy.</li><li>Identify opportunities for the use of alternative energy sources and assess their environmental and economic efficiency.</li><li>Develop a monitoring and reporting system for environmental indicators, including the measurement of energy consumption, emissions, and other environmental parameters.</li><li>Develop a procedure for regular analysis and reporting on environmental performance to optimize production processes and reduce the negative impact on the environment.<ol><li><strong>Support procurement </strong><strong>of equipment </strong><strong>and services</strong></li></ol></li></ol><ol><li><strong>Assist with preparation of procurement documentation</strong></li></ol><ol><li>Support PIC with preparation of relevant documentation for procurement, including requests for proposals (Request for Proposal, RFP) or requests for quotations RFQ (Request for Quotation), for suppliers.</li><li>Include technical specifications, warranty conditions, delivery conditions, company and proposed staff qualification and evaluation criteria, and other relevant details in the documentation.</li></ol><ol><li><strong>Support PIC during</strong><strong> the </strong><strong>evaluation</strong><strong> process</strong></li></ol><ol><li>Evaluate technical proposals from vendors based on their RFP/RFQ responses.</li><li>Analyze the technical offers, including compliance with requirements, price offers, quality of equipment and terms of delivery.</li><li>Evaluate the technical characteristics of the proposed equipment from each supplier and its compliance with the requirements.</li><li>Analyze the provision of guarantees and technical support by suppliers throughout the life cycle of equipment.</li><li>Verify suppliers&#39; qualifications and experience.</li><li>Suggest selection of the most suitable supplier(s) based on the results of the technical evaluation.<strong>1.5.Supervision of the installation and commissioning of equipment</strong></li></ol><p>One of the most important stages in the construction of the Data center and the Situation Center is supervision of the installation and commissioning of equipment. This stage is critical for the successful implementation of the project since the correct installation and correct commissioning of the equipment are the basis for its reliable and efficient operation. It includes the following main activities:</p><p><strong>1.Implementation of supervision and control process</strong></p><ol><li>Supervise the process of installation and commissioning of Tier III equipment to verify compliance of the work performed with the requirements of Uptime Institute standards.</li><li>Carry out regular inspections, quality checks, time control and coordination with the contractor of the completed stages of work.&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>2. Coordination of installation and commissioning plans</strong><ol><li>Discussing and agreeing with the contractor the details of installation and commissioning plans, including the sequence of operations, the use of tools and technical solutions.</li><li>Verification of compliance of plans with the requirements of Uptime Institute standards and further approval.</li></ol></li><li><strong>Coordination with other contractors</strong><ol><li>Ensure communication and coordination with other contractors that may be involved in the installation and commissioning process (for example, electricians, plumbers, refrigeration engineers).</li><li>Coordinate work schedules and ensuring consistency of actions between all project participants.</li></ol></li><li><strong>Quality control</strong><ol><li>Planning and conducting tests of equipment after installation and commissioning to verify its performance and compliance with requirements.</li><li>Check the functionality, performance, fault tolerance and security of the system as a whole.</li><li>Verify and control of compliance of the installation and commissioning of Tier III equipment with the norms and standards defined by the Uptime Institute.</li><li>Verify compliance with electrical safety, fire safety, power stability, cooling, and other relevant codes and regulations.</li><li>Participate in acceptance tests of Tier III equipment, carried out after installation and commissioning.</li><li>Assistance in testing, verifying the health, performance and security of the system, as well as assessing its compliance with the requirements of the Uptime Institute standards.</li></ol></li><li><strong>Final check and acceptance:</strong><ol><li>Carry out a final check of the work performed and comparing with the requirements and expectations of the project.</li><li>Organize the work acceptance procedure and confirmation of compliance of installation and commissioning with Uptime Institute standards.</li></ol></li><li><strong>Training and knowledge transfer</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1. Ensure the transfer of the necessary knowledge and documentation to the data center personnel&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;2. Support transfer of the project to the customer or operating company, including the provision of all necessary documentation, staff training and assistance during commissioning.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>7. Installation and commissioning documentation</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1. Develop complete and accurate documentation of the installation and commissioning of equipment, including reports on the work performed, test reports, certificates of conformity, technical specifications and other necessary documents.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 2. Develop a detailed report on the installation and commissioning of equipment, including a description of the work performed, resources used, timing and test results.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 3. Account for the requirements of Uptime Institute standards for documentation and its readiness for further use and archiving.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>8.</strong><strong>Evaluation of results and elimination of defects</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;1. Check the results of installation, commissioning of equipment, and assess their compliance with the requirements and expectations of the project.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;2. In case of detection of defects or inconsistencies, organize and control their elimination in accordance with established procedures.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>9.Change management and control </strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;1.Control and manage changes in the process of installation and commissioning of Tier III equipment.&nbsp; &nbsp; &nbsp;2. Record and track changes made to plans, specifications, or other documents, and to be ensure that they comply with project requirements and Uptime Institute standards.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;3.Evaluate the impact of changes on the schedule, budget and risks of the project, as well as make appropriate decisions and adjustments.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; <strong>10.</strong>&nbsp;<strong>Resource management</strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 1.Plan and manage the resources and materials needed to successfully completed the installation and commissioning of Tier III equipment.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 2.Ensure the availability of necessary components, spare parts, tools and equipment in accordance with work plans and the requirements of Uptime Institute standards.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; 3.Monitor the use of resources and accounting for their spending in the process of performing work.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<strong>1.6. Support during final</strong><strong> acceptance and project handover</strong></li></ol><p>The Consultant should take part, together with the specialists of the State Unitary Enterprise &quot;Smart City&quot;, as well as other representatives of the Government of the Republic, if necessary, in the activities related to the final acceptance and project handover, which will include the following activities:</p><ol><li>Preparation of documentation: The Consultant shall provide the State Commission with all necessary documentation, reports and protocols related to the carried out technical supervision activities. This includes performance verification reports, test results, and inspections of data center systems and equipment.</li><li>Participation in the Site Inspection: The Consultant must attend the Site Inspection conducted by the State Commission and provide objective information and explanations regarding the work performed and the site&#39;s compliance with project requirements and Uptime Institute standards.</li><li>Assistance in Testing: The Consultant shall facilitate the testing and inspection of data center systems and equipment in accordance with the requirements and procedures established by the State Commission. He shall provide the necessary advice and guidance on the conduct of the tests and ensure that they are carrying out correctly.</li><li>Provision of technical support: The Consultant shall provide technical support to the State Commission, answering questions, providing the necessary data and information about the work performed, systems and equipment of the data center. It shall also facilitate the identification and elimination of possible shortcomings or deviations from the design.</li><li>Ensuring Compliance with Standards: The Consultant shall ensure that the work performed complies with Uptime Institute standards and other accepted codes and regulations. He must provide evidence of the object&#39;s compliance with the requirements, as well as offer recommendations for improvement, if necessary.</li><li>Assistance in concluding the acceptance of the object: The Consultant shall actively cooperate with the State Commission and specialists of SUE &quot;Smart City&quot; in the process of concluding the acceptance of the object. He must provide the necessary information and documentation, maintain communication, and participate in the discussion and resolution of emerging issues and problems.</li></ol><p>The assignment duration including preparing the TOR, implementation plan and budget, supervision activities - 3 years or 36 months.</p><p>The detailed Terms of Reference (TOR) for the assignment can be obtained at the address given below.</p><p>The Project Implementation Unit under the State Institution &quot;CENTER FOR PROJECT IMPLEMENTATION AND ACCESS TO GREEN FINANCING AND RURAL DEVELOPMENT FINANCE&quot; now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.</p><p><strong>Qualification and experience</strong><strong> of the consultancy firm</strong></p><ol><li>Technical experience and expertise: Not less than 10 years of work experience in designing and technically&nbsp; supervising datacenters, out of which at least 3 (three) Tier 3 or Tier 4 data center design experiences for an IT Capacity of 1MW or more, with a total data center design experience (total of IT load capacities of data centers designed by the consultant) of 10MW or more; knowledge of relevant standards and recommendations, such as ANSI/TIA-942, Uptime Institute Tier Standard and / or others.</li><li>Proven ability to work with clients to understand their requirements and standards while designing a Tier 3 data centers (ability to translate client requirements into clear and specific technical specifications); ability to develop detailed technical solutions and offer the best options for equipping data centers to achieve the required level of reliability and availability.</li><li>Technical competences: Experience in writing technical specifications and terms of references for data infrastructure and related fields in an easily understandable manner; ability to consider project constraints, timelines, budget, and other factors (such modern technologies and best practices), when writing technical specifications and assignments.</li><li>Good knowledge of local regulatory environment would be desirable.</li><li>Communication and stakeholder engagement: Proven track record of effectively engaging with various entities, including government officials, engineers, developers, and management staff; strong writing skills with the ability to demonstrate accuracy, clarity, and logical consistency while drafting technical documents; solid team management and collaboration skills.</li><li>Ability to work under time constraints and pressure and being receptive of feedback.</li></ol><p><strong>Team Composition</strong></p><p>The consultant company may at its discretion, offer a list of specialists required to perform the services. The consultant may invite, as necessary, additional specialists to implement certain technical and organizational issues.</p><p>To perform the tasks specified in the Terms of Reference, the Consultant has the right to involve both local and international experts.</p><p>To carry out its activities, the consultant must hire at certain stages of the project such specialists as:</p><ol><li>Design Engineers</li><li>Network and communications engineers</li><li>Systems administration engineers</li><li>Power and Cooling Engineers</li><li>Monitoring and control engineers</li><li>System or Network Architects</li><li>Storage Engineers</li><li>IT architects</li><li>Training and Development Specialists</li><li>Data backup and recovery specialists</li><li>Access control and security specialists</li><li>Switching and Routing Specialists</li><li>Information security specialists</li><li>Software Quality Assurance Specialists</li><li>Data analysts</li></ol><p>In addition, the Consultant shall field any technical, non-technical and administrative staff to enable the timely delivery of the assignment and to the required standard.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.&nbsp;</p><p>Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the Framework Agreement arrangements described in the Procurement Regulations and to be specifically set out in the Request for Proposals.</p><p>Further information can be obtained at the address below during office hours 09:00 &ndash; 17:00.</p><p>Expressions of interest must be delivered in a written form to the e-mail&rsquo;s below by December 14, 2023, 5:00 p.m. local time.</p><p><strong>Attention: Umed Ziyoev, Lead Specialist of the Information and Communication Technologies Center of EOP</strong></p><p><strong>E-Mail: </strong><strong>z.umed@dip.tj</strong></p><p><strong>Cc: </strong><strong>katya.bobro@gmail.com</strong><strong> </strong></p><p>&nbsp;<strong> </strong></p>"},{"id":"OP00259245","notice_type":"Contract Award","noticedate":"22-Nov-2023","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Nigeria","project_id":"P169405","project_name":"Sustainable Procurement, Environmental and Social Standards Enhancement Project (SPESSE)","bid_reference_no":"NG-FUTO OWERRI-251159-GO-RFQ","bid_description":"Upgrade of Data Centre","procurement_group":"GO","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","submission_date":"2023-11-22T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project: </b>P169405-Sustainable Procurement, Environmental and Social Standards Enhancement Project (SPESSE)<br/><b>Loan/Credit/TF Info: </b>IDA-65250; IDA-V2820<br/><b>Bid/Contract Reference No: </b>NG-FUTO OWERRI-251159-GO-RFQ<br/><b>Procurement Method: </b>RFQ-Request for Quotations<br/><b>Scope of Contract: </b><span class='desc-word-wrap'>Data Centre Upgrade Deployment of LAN NG/CE-sPESS/GDS/NS/21/09</span><br/><b>Notice Version No: </b>1</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2022/11/10<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>2 Week(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>EVAVIRGE TECHNOLOGY LTD (807152)</b><br/>8A Owena Street Abacha Estate Wuse Zone 4 Abuja.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN 19876750.00<br/><br/>Evaluated Bid Price<br/>NGN 19876750.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>NGN 19876750.00</div><br/></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>DAVE-DANIEL GLOBAL RESOURCES LIMITED (807149)</b><br/>497, CADASTRAL ZONE C2, GWARINPA DISTRICT, ABUJA.<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN 23101750.00<br/><br/>Evaluated Bid Price<br/>NGN 23101750.00</div></br></div><br/></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>LADISIS SYNERGY NIGERIA LIMITED (807144)</b><br/>40B UBIAJA CRESECENT GARKI II, ABUJA FCT<br/>Country: Nigeria<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>NGN 20425000.00<br/><br/>Evaluated Bid Price<br/>NGN 20425000.00</div></br></div><br/></div></div>"},{"id":"OP00224088","notice_type":"Request for Expression of Interest","noticedate":"19-Apr-2023","notice_lang_name":"French","notice_status":"Published","submission_deadline_date":"2023-05-12T00:00:00Z","submission_deadline_time":"15:00","project_ctry_name":"Cameroon","project_id":"P173240","project_name":"Acceleration of the Digital Transformation of Cameroon Project","bid_reference_no":"CM-MINPOSTEL-334246-CS-INDV","bid_description":"Sélection  d'un consultant pour l'intégration de la sécurité et de la communication dans le système e-voucher","procurement_group":"CS","procurement_method_code":"CQS","procurement_method_name":"Consultant Qualification  Selection","contact_address":"Ministry of Posts and Telecommunications\nMINPOSTEL\nYAOUNDE - CAMEROON","contact_ctry_name":"Cameroon","contact_email":"w.mfuh@patnuc.cm","contact_name":"Windfred Mfuh Fuayi Kenji","contact_organization":"MINISTRY OF POSTS AND TELECOMMUNICATIONS","contact_phone_no":"+237 693754702","submission_date":"2023-04-19T00:00:00Z","notice_text":"<p><strong>Coop&eacute;ration Cameroun Banque Mondiale &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cameroon WORLD BANK Coop&eacute;ration</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ****************</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; MINISTERE DES POSTES ET TELECOMMUNICATIONS&nbsp; </strong></p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; </strong><strong>MINISTRY OF POSTS AND TELECOMMUNICATIONS</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; ****************</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; PROJET&nbsp;D&rsquo;ACCELERATION DE LA TRANSFORMATION</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; PROGRAM FOR THE ACCELERATION OF THE DIGITAL</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; TRANSFORMATION OF CAMEROON (PATNUC)</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ****************</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; UNITE DE GESTION DU PROJET</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; PROJECT IMPLEMENTATION UNIT</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ****************</strong></p><p><strong>AVIS DE SOLLICITATION </strong><strong>&Agrave;</strong><strong> MANIFESTATION D&rsquo;INTERET N&deg;017 DU 18 Avril 2023 RELATIF </strong><strong>&Agrave;</strong><strong> LA SELECTION D&rsquo;UN CONSULTANT EN CHARGE DE </strong><strong>L&rsquo;INT&Eacute;GRATION DE LA S&Eacute;CURIT&Eacute; ET DE LA COMMUNICATION DANS LE SYST&Egrave;ME DU MECANISME DE SUBVENTIONS PAR BONS D&rsquo;ACHAT ELECTRONIQUES SU PATNUC &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p><strong><u>DATE&nbsp;: &nbsp;18 Avril 2023</u></strong></p><p><strong><u>FINANCEMENT&nbsp;:</u></strong> <strong>IDA 69870-CM</strong></p><p><strong><em>Cette sollicitation de manifestation d&rsquo;int&eacute;r&ecirc;t fait suite &agrave; l&rsquo;Avis G&eacute;n&eacute;ral de Passation des March&eacute;s de ce projet publi&eacute; dans le Journal des March&eacute;s (JDM) le 14 mars 2023, dans le Cameroon Tribune du 17 mars 2023 et dans le syst&egrave;me de Passation des March&eacute;s de la Banque Mondiale (STEP) le 20 mars 2023</em></strong></p><p>1. CONTEXTE ET JUSTIFICATIF</p><p>Le Gouvernement du Cameroun a b&eacute;n&eacute;fici&eacute; d&rsquo;un pr&ecirc;t de la Banque mondiale d&#39;un montant de 100 millions USD pour mettre en &oelig;uvre le Projet d&rsquo;Acc&eacute;l&eacute;ration de la Transformation Num&eacute;rique au Cameroun (PATNUC). Le PATNUC est plac&eacute; sous la tutelle du MINPOSTEL et a pour objectif d&#39;accro&icirc;tre l&#39;inclusion num&eacute;rique et l&#39;utilisation de solutions agricoles num&eacute;riques par des petits exploitants agricoles acteurs des cha&icirc;nes de valeur agricoles cibles. Ainsi, le PATNUC incarne l&rsquo;approche de la transformation num&eacute;rique, ciblant un secteur hautement strat&eacute;gique pour le Cameroun tout en proposant de r&eacute;former le cadre r&egrave;glementaire du secteur des Technologies de l&rsquo;Information et de la Communication (TIC). Ce projet, avec son investissement dans la connectivit&eacute; et les comp&eacute;tences num&eacute;riques, soutient des interventions qui tirent parti des innovations num&eacute;riques pour stimuler la croissance agricole, afin de contribuer en fin de compte &agrave; l&rsquo;am&eacute;lioration de la qualit&eacute; des moyens de subsistance en milieu rural.</p><p>Le PATNUC est structur&eacute; autour de 4 composantes : (i) Strat&eacute;gie, politique publique et la r&eacute;glementation num&eacute;rique pour l&rsquo;inclusion et la transformation num&eacute;rique ; (ii) connectivit&eacute; et inclusion num&eacute;riques ; (iii) facilitation de l&rsquo;impl&eacute;mentation des solutions num&eacute;riques bas&eacute;es sur les donn&eacute;es dans le secteur agricole ; et (iv) gestion du projet et l&rsquo;engagement citoyen. Ainsi, le gouvernement &agrave; travers la SND30, ambitionne d&rsquo;enclencher v&eacute;ritablement la transformation structurelle de l&rsquo;&eacute;conomie camerounaise qui s&rsquo;appuiera sur une modernisation du secteur agricole (agriculture, &eacute;levage, p&ecirc;che et aquaculture) &agrave; travers l&rsquo;am&eacute;lioration de la productivit&eacute; et la comp&eacute;titivit&eacute; des exploitations familiales agricoles et la promotion d&rsquo;une dynamique d&rsquo;industrialisation v&eacute;ritable. La modernisation du secteur agricole devra s&rsquo;appuyer sur l&rsquo;&eacute;cosyst&egrave;me num&eacute;rique en constante &eacute;volution dans le pays qui trace la voie de l&rsquo;&eacute;conomie num&eacute;rique.</p><p>La sous-composante 3.2<strong> </strong>vise &agrave; faciliter l&#39;engagement des petits exploitants dans l&#39;agriculture num&eacute;rique ax&eacute;e sur l&#39;am&eacute;lioration de la productivit&eacute; et les donn&eacute;es &agrave; travers un mod&egrave;le de subvention de bons d&rsquo;achat &eacute;lectroniques des agriculteurs et groupes d&#39;agriculteurs travaillant dans les cha&icirc;nes de valeur agricoles cibl&eacute;es prioritairement par le gouvernement. C&rsquo;est en ce sens que le PATNUC entend proc&eacute;der au d&eacute;veloppement et au d&eacute;ploiement d&rsquo;une plateforme modulaire de gestion des subventions par bons d&rsquo;achat &eacute;lectroniques pour laquelle l&rsquo;int&eacute;gration de la s&eacute;curit&eacute; et de la communication sont n&eacute;cessaires.</p><p>2. OBJECTIFS GLOBAL</p><p>L&rsquo;objectif global assign&eacute; au consultant est de cr&eacute;er un syst&egrave;me de messagerie, un syst&egrave;me d&#39;authentification des donn&eacute;es et un syst&egrave;me de cryptage des donn&eacute;es comme int&eacute;gration de la s&eacute;curit&eacute; et de la communication dans le syst&egrave;me du m&eacute;canisme de subventions par bons d&rsquo;achat &eacute;lectroniques du projet.</p><p>3. OBJECTIFS SPECIFIQUES</p><p>Les objectifs sp&eacute;cifiques de la mission sont les suivants&nbsp;:</p><ul><li>Produire une note m&eacute;thodologique qui sera discut&eacute;e pour validation en m&ecirc;me temps que le cahier des charges au cours d&rsquo;une r&eacute;union organis&eacute;e &agrave; cet effet ;</li><li>Faire un &eacute;tat des lieux des applications similaires existantes&nbsp;incluant une proposition d&rsquo;&eacute;quipements n&eacute;cessaires pour le fonctionnement harmonieux du module &agrave; mettre en place ;</li><li>Concevoir, tester et d&eacute;ployer la s&eacute;curit&eacute; et de la communication dans la plateforme ;</li><li>Elaborer le manuel ou guide de l&rsquo;utilisateur&nbsp;;</li><li>Former les administrateurs et administratrices&nbsp;; et les utilisateurs et utilisatrices dans l&rsquo;op&eacute;rationnalisation du module&nbsp;;</li><li>Assurer le suivi du fonctionnement et la maintenance du module pour une dur&eacute;e de 12 mois apr&egrave;s livraison&nbsp;;</li><li>Proposer un mod&egrave;le de contrat de support une fois la garantie expir&eacute;e.</li></ul><p>Le module devra &ecirc;tre couvert par une garantie d&rsquo;un (01) an au minimum pendant laquelle tout dysfonctionnement survenu est r&eacute;solu par le Consultant, en corrigeant les bugs. Toutefois, la responsabilit&eacute; du Consultant n&rsquo;est engag&eacute;e que si le dysfonctionnement survient sur une fonctionnalit&eacute; telle que d&eacute;finie dans le cahier des charges.</p><p><strong>4.</strong> <strong>DUREE DE LA MISSION </strong></p><p>La dur&eacute;e globale de r&eacute;alisation de la mission est de trois (03) mois auxquels s&rsquo;ajoutent 12 mois de suivi du fonctionnement et la maintenance du module.</p><p><strong>5. </strong><strong>PROFIL DU CONSULTANT</strong></p><p>Le consultant devra &ecirc;tre un cabinet ou groupement de cabinets remplissant les crit&egrave;res suivants&nbsp;:</p><ul><li>Cinq (05) ans d&rsquo;exp&eacute;rience minimale ou missions dans le domaine des&nbsp;TIC ;</li><li>Cinq (05) ans d&rsquo;exp&eacute;rience minimale ou missions dans le d&eacute;veloppement et le d&eacute;ploiement d&rsquo;applications num&eacute;riques sur terminaux mobiles.</li><li>dix (10) ans d&#39;exp&eacute;rience minimum dans le domaine de la s&eacute;curit&eacute; des r&eacute;seaux.</li></ul><p>Le cabinet ou groupement de cabinets devra proposer une &eacute;quipe d&rsquo;intervention constitu&eacute;e des experts-cl&eacute;s indiqu&eacute;s comme suit :</p><ol><li>Un.e chef.fe de mission (Bac+5) expert en TIC, informatique ou toute autre discipline connexe avec une exp&eacute;rience de 05 (cinq) ans au moins) en mati&egrave;re de conception, de d&eacute;veloppement et de mise en &oelig;uvre des syst&egrave;mes d&rsquo;informations num&eacute;riques ;</li><li>Un.e expert.e (Bac+3) en d&eacute;veloppement d&rsquo;application web et mobile avec une connaissance justifi&eacute;e de 03 (trois) ans au moins) du d&eacute;veloppement sur les environnements mobiles (Android, IOS, etc.)&nbsp;avec au moins 02 (deux) missions similaires r&eacute;alis&eacute;es.</li></ol><p>6. METHODE DE SELECTION</p><p>Il est port&eacute; &agrave; l&rsquo;attention des Consultants que les Cabinets ou Groupement de Cabinets/Bureau d&rsquo;&eacute;tudes seront s&eacute;lectionn&eacute;s selon la M&eacute;thode &laquo;<strong> S&eacute;lection Fond&eacute;e sur la Qualification des Consultants &raquo; (SQC) telle que d&eacute;crite dans le R&egrave;glement de Passation des March&eacute;s pour les Emprunteurs sollicitant le Financement de Projets d&rsquo;Investissement (FPI) de la Banque Mondiale </strong><strong>&eacute;dition de Novembre 2020</strong>. La langue de travail est le fran&ccedil;ais et l&rsquo;anglais. Il est &eacute;galement port&eacute; &agrave; l&rsquo;attention des Consultants que les dispositions des paragraphes 7.11 et 7.12 dudit R&egrave;glement relatives aux r&egrave;gles de la Banque Mondiale en mati&egrave;re de conflit d&rsquo;int&eacute;r&ecirc;ts sont applicables.</p><p><strong>7. </strong><strong>CONTENU DES MANIFESTATIONS A ADRESSER AU PATNUC.</strong></p><p>Le Ministre des Postes et T&eacute;l&eacute;communications (MINPOSTEL) invite, en vue d&rsquo;&eacute;laborer la liste restreinte, les consultants admissibles &agrave; manifester leur int&eacute;r&ecirc;t &agrave; fournir les services d&eacute;crits ci-dessus. Les cabinets/groupement de cabinets int&eacute;ress&eacute;s doivent fournir les informations (d&eacute;pliants, brochures, etc.) indiquant qu&rsquo;ils sont qualifi&eacute;s pour ex&eacute;cuter les services. Cette manifestation devra contenir&nbsp;1-Une lettre de manifestation d&rsquo;int&eacute;r&ecirc;t adress&eacute;e au Ministre des Postes et T&eacute;l&eacute;communications, 2-La justification du statut juridique du Consultant et 3-les pi&egrave;ces justificatives permettant la v&eacute;rification des crit&egrave;res de pr&eacute;s&eacute;lection tels que pr&eacute;sent&eacute;s ci-dessus. Toute information pertinente non justifi&eacute;e sera sans importance.</p><p><strong>8.&nbsp; </strong><strong>CONTACT ET INFORMATIONS SUPPLEMENTAIRES</strong></p><p>Les termes de r&eacute;f&eacute;rence de cette prestation sont disponibles dans le UNDB online<em> </em>(https://devbusiness.un.org) et peuvent &ecirc;tre obtenus en version PDF par courriel &agrave;&nbsp;: procurement@patnuc.cm<u>.</u></p><p>Les Consultants int&eacute;ress&eacute;s peuvent obtenir les informations suppl&eacute;mentaires par courriel &agrave; procurement@patnuc.cm ou par t&eacute;l&eacute;phone aux num&eacute;ros&nbsp;: +237 222 232&nbsp;628</p><p>Les manifestations doivent parvenir au plus tard le<strong><u> 12 mai 2023 &agrave; 15 heures</u></strong>, soit<strong> </strong>par courriel &agrave;&nbsp;: procurement @patnuc.cm, soit d&eacute;pos&eacute;es sous pli ferm&eacute; en cinq (05) exemplaires (un original et quatre copies) &agrave; l&rsquo;Unit&eacute; de Gestion du projet &agrave; l&rsquo;Unit&eacute;, au 1er &eacute;tage du b&acirc;timent annexe du MINPOSTEL, situ&eacute; entre la Poste centrale et ENEO centrale. T&eacute;l.&nbsp;: +237 222 232&nbsp;628 portant la mention&nbsp;:</p><p><strong>&laquo;&nbsp;</strong><strong>AVIS DE SOLLICITATION A MANIFESTATIONS D&rsquo;INTERET N&deg;</strong><strong>017</strong><strong> DU 18 AVRIL 2023 RELATIF A LA SELECTION D&rsquo;UN CONSULTANT EN CHARGE DE </strong><strong>L&rsquo;INT&Eacute;GRATION DE LA S&Eacute;CURIT&Eacute; ET DE LA COMMUNICATION DANS LE SYST&Egrave;ME DU M</strong><strong>ECANISME DE SUBVENTIONS PAR BONS D&rsquo;ACHAT ELECTRONIQUES</strong><strong> </strong><strong>DU PATNUC &raquo;</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Le Ministre des Postes et T&eacute;l&eacute;communications</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (MINPOSTEL)</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mme LIBOM LI LIKENG n&eacute;e MENDOMO Minette</strong></p><p><strong><u>Ampliations</u></strong><strong>&nbsp;:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>- PATNUC&nbsp;;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>&nbsp; -ARMP;</p><p>&nbsp;&nbsp; - SOPECAM&nbsp;;<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp; - ARCHIVES ;<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; - AFFICHAGE.</p><p>VERSION ANGLAISE</p><p><strong>NOTICE OF REQUEST FOR EXPRESSIONS OF INTEREST N&deg; 017 FOR THE SELECTION OF A CONSULTANT IN CHARGE OF THE INTEGRATION OF SECURITY AND MESSAGING MODULES IN THE ELECTRONIC VOUCHER SUBSIDY SYSTEM OF PATNUC</strong></p><p><strong>DATE: 18 April 2023</strong></p><p><strong><em>FUNDING: IDA 69870-CM</em></strong></p><p><strong><em>This request for Expression of Interest follows the General Procurement Notice for this project published in the Journal des March&eacute;s (JDM) on 14th March 2023, in the Cameroon Tribune of 17th March, 2023 and in the procurement system of the World Bank (STEP) on the 20th of&nbsp; March 2023</em></strong></p><ol><li><strong>BACKGROUND AND JUSTIFICATION </strong></li></ol><p>The Government of Cameroon has received a USD 100 million loan from the World Bank to implement the Program for the Acceleration of the Digital Transformation of Cameroon (PATNUC). PATNUC is under the supervision of MINPOSTEL and aims to increase digital inclusion and the use of digital agricultural solutions by smallholder farmers in targeted agricultural value chains. Thus, PATNUC embodies the digital transformation approach; targeting a highly strategic sector for Cameroon while proposing to reform the regulatory framework of the Information and Communication Technologies (ICT) sector, improve the digital skills of citizens and to promote the development of digital applications and services. This project, with its investment in digital connectivity and skills, supports interventions that leverage digital innovations to stimulate agricultural growth, ultimately contributing to improved rural livelihoods.</p><p>PATNUC is structured around 4 components: (i) Digital Strategy, Public Policy and Regulation for Digital Inclusion and Transformation; (ii) Digital Connectivity and Inclusion; (iii) Facilitating the implementation of data-driven digital solutions in the agricultural sector; and (iv) Project Management and Citizen Engagement. Thus, the government, through the SND30, aims to truly initiate the structural transformation of the Cameroonian economy, which will be based on the modernisation of the agricultural sector (agriculture, livestock, fisheries, and animal industries) through the improvement of the productivity and competitiveness of family farms and the promotion of a genuine industrialisation dynamic. The modernisation of the agricultural sector will have to be based on the digital ecosystem that is constantly evolving in the country, which is paving the way for the digital economy.</p><p>Sub-component 3.2 aims to facilitate the engagement of smallholder farmers in digital agriculture focused on productivity improvement and data through an e-voucher subsidy model for farmers and farmer groups working in the agricultural value chains prioritised by the government. To this end, PATNUC intends to develop and deploy a modular e-voucher subsidy management platform for which integrated security and messaging modules are required.</p><p><strong>2. OVERALL OBJECTIVES</strong></p><p>The overall objective assigned to the consultant is to create a messaging system, a data authentication system and a data encryption system, which are integrated into the e-voucher grant mechanism system.</p><p><strong>3. SPECIFIC OBJECTIVES </strong></p><p>The specific objectives of the assignment are the following:</p><ul><li>Produce a methodological note which will be discussed for validation at the same time as the specifications during a meeting organised for this purpose,</li><li>undertake an appraisal of existing similar applications including a proposal for the equipment necessary for the harmonious operation of the module to be set up,</li><li>Design, test and deploy security and messaging system,</li><li>Develop the user manual or user guide,</li><li>Train the administrators and users in the operation of the registration module,</li><li>Monitor the operation and maintenance of the module for a period of 12 months after delivery,</li><li>Propose a model contract for technical support once the guarantee period expires,</li></ul><p>The module shall be covered by a warranty of at least one (01) year during which any malfunctioning that occurs shall be resolved by the Consultant by fixing the bugs. However, the Consultant shall only be liable if the malfunction occurs on a functionality as defined in the specifications.</p><p><strong>4. DURATION OF THE MISSION </strong></p><p>The overall duration of the mission is three (03) months, plus 12 months of monitoring the operation and maintenance of the module.</p><p><strong>5. PROFILE OF THE CONSULTANT</strong></p><p>The consultant must be a firm or group of firms meeting the following criteria:</p><ul><li>05 (five) years of minimum experience or assignments in the field of ICT,</li><li>05 (five) years of experience or assignments in the development and deployment of digital applications on mobile terminals.</li><li>10 (ten) years minimum experience in network security.</li></ul><p>The firm or group of firms must propose an intervention team made up of the following key experts:</p><ol><li><strong>A project leader (at least holder Master&rsquo;s degree or equivalent experience)</strong> expert in ICT, computer science or any other related discipline with at least 05 (five) years of experience in the design, development and implementation of digital information systems,</li><li><strong>An expert (at least holder bachelor&rsquo;s degree or equivalent experience)</strong> in web and mobile application development with at least 03 (three) years of proven ability of application development within mobile platforms (Android, IOS, etc.) with at least 02 (two) similar assignments completed.</li></ol><p>6. SELECTION METHOD</p><p>Consultants are advised that firms or groupings of firms will be selected according to the <strong><em>&quot;Selection Based on Consultants&#39; Qualifications&quot; (SQC) method as described in the Procurement Rules and Regulations for Borrowers Applying for Investment Project Financing (IPF) of the World Bank, November 2020 edition.</em></strong> The working language is English and French. Consultants are also advised that the provisions of Paragraphs 7.11 and 7.12 of the said Regulations relating to the World Bank&#39;s rules on conflict of interest are applicable.</p><p><strong>7. </strong><strong>CONTENU DES MANIFESTATIONS A ADRESSER AU PATNUC</strong></p><p>The Minister of Posts and Telecommunications (MINPOSTEL) invites eligible consultants to express their interest in providing the services described above, with a view to drawing up a shortlist. Interested firms or grouping of firms should provide information (leaflets, brochures, etc.) indicating that they are qualified to perform the services. This expression of interest should contain:</p><p>A letter of expression of interest addressed to the Minister of Posts and Telecommunications,</p><ul><li>Justification of the legal status of the Consulting firm (s),</li><li>Supporting documents that permit the verification of the pre-selection criteria as presented above. Any relevant information that is not justified will be irrelevant.</li></ul><p><strong>8.&nbsp; CONTACT AND FURTHER INFORMATION</strong></p><p>The terms of reference for this service are available in the UNDB online (https://devbusiness.un.org)&nbsp; and can be obtained in PDF version by e-mail to: procurement@patnuc.cm &nbsp;&nbsp;Interested Consultants may obtain additional information by email at procurement@patnuc.cm&nbsp; or by telephone on +237 222 232 628</p><p>Expressions of interest must be received no later than <strong>12 May 2023</strong>at 3 pm</p><ul><li>by email to: procurement@patnuc.cm &nbsp;</li><li>or deposited in a sealed envelope in five (05) copies (one original and four copies) at the Project Implementation Unit, on the 1st floor of the MINPOSTEL annex building, located between the Central Post Office and ENEO Central office. Tel: +237 222 232 628 with the inscription:</li></ul><p><strong>&laquo;&nbsp;</strong><strong>NOTICE OF REQUEST FOR EXPRESSIONS OF INTEREST N&deg; 017 FOR THE SELECTION OF A CONSULTANT IN CHARGE OF THE INTEGRATION OF SECURITY AND MESSAGING MODULES IN THE ELECTRONIC VOUCHER SUBSIDY SYSTEM OF PATNUC</strong><strong>&raquo;</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Yaound&eacute;, <strong>18 April 2023</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Minister of Posts and Telecommunications</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (MINPOSTEL)</strong></p><p><strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mme LIBOM LI LIKENG n&eacute;e MENDOMO Minette</strong></p><p><strong><u>Ampliations</u></strong><strong>&nbsp;:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>- PATNUC&nbsp;;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>&nbsp; -ARMP;</p><p>&nbsp;&nbsp; - SOPECAM&nbsp;;<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp; - ARCHIVES ;<strong> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</strong></p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; - AFFICHAGE.</p><p>&nbsp;</p>"},{"id":"OP00222873","notice_type":"General Procurement Notice","noticedate":"10-Apr-2023","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Maldives","project_id":"P177040","project_name":"MV: Digital Maldives for Adaptation, Decentralization and Diversification","contact_address":"NCIT,\nHandhuvaree Hingun, Maafannu,\n64, Kalaafaanu Hingun, \nMale’ 20064, \nRepublic of Maldives.","contact_ctry_name":"Maldives","contact_email":"shama.ahmed@ncit.gov.mv","contact_name":"Shama Ahmed  Rasheed","contact_organization":"Ministry of Environment, Climate Change and Technology","contact_phone_no":"+960 9195041","contact_web_url":"http://www.environment.gov.mv/","submission_date":"2023-04-10T00:00:00Z","notice_text":"<p>Digital Maldives for Adaptation, Decentralization and Diversification (DMADD) Project&nbsp;</p><p>Grant No: E047-MV&nbsp;</p><p>Project ID No.: P177040&nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>The Government of the Republic of Maldives with the assistance of World Bank has been formulating Digital Maldives for Adaptation, Decentralization and Diversification (DMADD) Project, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project.This project will be fully financed by the International Development Association (IDA), World Bank.&nbsp;</p><p>The proposed project will include the following components:&nbsp;</p><p><strong>1. Enabling environment for improved digital connectivity and competitiveness ($2.0 million) </strong>This component will support fostering Maldives&rsquo; digital transformation, improved regulatory foundations and institutional capacity are needed to promote affordable, quality Internet access and a robust public digital ecosystem. Investments in improved regulatory tools and institutional strengthening will contribute to a more competitive telecommunications market, which, combined with investments in digital infrastructure such as a software defined wide area network for local island councils, will help deliver higher Internet speeds at lower costs, ultimately enabling more people to get online and to take advantage of a broader range of digital products and services. A more competitive market will also create a redundancy in network services for connectivity, allowing for continued service availability in times of climatic and other shocks or disasters and enhancing the government&rsquo;s disaster risk management capabilities.&nbsp;&nbsp;&nbsp;</p><p>1.1. Improving regulatory frameworks, oversight, and enforcement for a competitive broadband market&nbsp;</p><p>1.1.1. TA (Technical Assistance) for strengthening the regulatory frameworks for a competitive, open access broadband market (ICP)&nbsp;</p><p>1.1.2. TA, regulatory tools, and capacity building (on the job training) for CAM to support effective oversight and enforcement of digital infrastructure policies and regulations (OICP)&nbsp;</p><p>1.2. Empowering public institutions for digital transformation in government&nbsp;</p><p>1.2.1. Support in restructuring NCIT as an independent statutory body, establishing Government Digital Service (OICP)&nbsp;</p><p>1.2.2. Improving the government network infrastructure by putting in place a software-defined wide area network across islands (OICP)&nbsp;</p><p>1.2.3. Development of a business continuity and disaster recovery plan (ICP)&nbsp;&nbsp;&nbsp;</p><p><strong>2. Digital identification for improved online and in-person service delivery ($4.5 million)</strong> This component will help enhance trust and efficiency in both in-person and online transactions and service delivery through a multipronged approach, which includes: (a) the establishment of legal and institutional enablers and safeguards for secure data- and identity management; b) the modernization of existing identity management software and hardware and the introduction of a new digitally enabled ID card, issued by the Department of National Registration; and (c) updating of the digital ID system to enable secure and consent-driven data sharing and authentication in remote, online contexts.&nbsp;&nbsp;</p><p>These investments will be implemented in a way that ensures operational and financial sustainability, in line with the Principles on Identification for Sustainable Development.&nbsp; The ID system(s) will be designed and built using international standards and leverage multivendor and open-source solutions, to the extent possible, to ensure adaptability and reduce the risk of vendor- and technology lock-in. The modernization of the system will also contribute to climate change mitigation and adaptation goals. The new hardware for identity management and data storage will be energy efficient in its operation, validated through compliance with globally recognized standards, contributing to mitigation objectives. The strengthened enabling environment for digital data governance (data protection, cyber, e-transactions, etc.) supported under subcomponent 2.1. will further contribute to resilience through greater availability and uptake of public and private sector services and transactions that can be accessed and completed online.&nbsp;&nbsp;</p><p>2.1. Legal and institutional enablers and safeguards for secure data and identity management&nbsp;</p><p>2.1.1. TA &amp; capacity building to support the establishment &amp; operationalization of an enabling legal and regulatory framework for trusted data- and identity management (e.g., data protection, privacy, cybercrime, cybersecurity, electronic transactions, digital identification) (OICP)&nbsp;</p><p>2.2. Modernizing of the foundational ID system and credential&nbsp;&nbsp;</p><p>2.2.1. TA &amp; capacity building to inform the design and implementation of proposed upgrades (IC)&nbsp;&nbsp;</p><p>2.2.2. Modernization of DNR&rsquo;s identity management software and equipment for data capture, processing, and storage (OICP)&nbsp;</p><p>2.2.3. Introduction of a new, digitally enabled ID credential (OICP)&nbsp;</p><p>2.2.4. Stakeholder engagement and communications on the system modernization, inclusive of women and members of vulnerable groups (IC)&nbsp;</p><p>2.3. Strengthening the digital authentication ecosystem&nbsp;</p><p>2.3.1. TA &amp; capacity building for system design, definition of requirements and technical specs (IC)&nbsp;</p><p>2.3.2. Upgrading the digital ID platform to enable secure, consent-driven authentication across the public and private sectors (OICP)&nbsp;</p><p>2.3.3. Stakeholder engagement and communications about the updated digital ID platform, inclusive of women and members of vulnerable groups (IC)&nbsp;</p><p><strong>3. Digital technologies and data platform for climate resilience ($3.0 million)&nbsp;&nbsp;</strong></p><p>The project will support the establishment of a shared data platform to enhance data-driven planning and policymaking for climate adaptation and resilience. The data platform will enable policymakers and other interested stakeholders to more easily, share, analyze, and visualize climate-relevant information and that related to the status and management of critical natural resources, by leveraging digital tools and technologies. Given the country&rsquo;s significant vulnerability to the impact of climate change, being able to better monitor and generate insights about changes in its natural environment will be critical to mitigate the economic and human impact of climate change and to develop effective adaptation strategies. Monitoring and managing the health of marine ecosystems, such as coral reefs, is especially important for Maldives given their role in protecting coastlines from storms and erosion, in preserving people&rsquo;s livelihoods as a source of food and income, and in continued growth of the tourism sector. The data platform can also be linked with early warning systems to circulate weather information and enhance disaster management. With this information, islands/atolls can deliver timely warnings to communities at risk of climate impact events.&nbsp;&nbsp;&nbsp;</p><p>3.1. Establishing a climate data platform&nbsp;</p><p>3.1.1. TA for data assessment, development of functional requirements, and an assessment of technology solutions (OICP)&nbsp;</p><p>3.1.2. TA for the development of a climate data model (OICP)&nbsp;</p><p>3.1.3. Establishment a shared data platform for climate resilience with data, analytics and services, incl. equipment/licenses for data storage, data collection/processing/analytics (OICP)&nbsp;&nbsp;&nbsp;</p><p>3.2. Leveraging digital technologies and tools for climate adaptation&nbsp;</p><p>3.2.1. New data collection and analysis on climate-critical ecosystems using novel digital technologies, tools, and analytics (OICP/ Direct Selection). It is expected to conduct four pilot projects under this subcomponent.&nbsp;&nbsp;</p><ul><li><p>Developing a Pilot Digital Technology based Floods and Storm Water Management and a water level monitoring system along with an Early Warning System for Fuvahmulah City.&nbsp;</p></li></ul><ul><li><p>Using passive acoustic monitoring to support reef restoration in K. Rasfari Protected Area a cargo ship has run aground on a reef off the coast of the island.&nbsp;&nbsp;</p></li><li><p>Using fluid lensing, implemented in collaboration with University of Miami/ACES, for improved coastal reef and mangrove management. Initial pilot sites include selected areas at Soneva Fushi to produce 3D maps and high-resolution and high-accuracy maps of Soneva Fushi&rsquo;s coral reefs, in partnership with the Soneva Foundation.&nbsp;&nbsp;</p></li><li><p>Organizing an &lsquo;Ocean Hackathon&rsquo; with the aim of surfacing innovative, locally-driven solutions that tap into digital technologies to improve ocean health, reduce marine pollution, address ocean acidification, and build climate resilience for coastal island communities.&nbsp;&nbsp;</p></li></ul><p>Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank Procurement Regulations for IPF Borrowers (November 2020) (Procurement Regulations) and is open to all eligible firms and individuals as defined in the Procurement Regulations.The agreed procurement plan and all subsequent updates shall be published on the Bank&#39;s external website.&nbsp;</p><p>Specific procurement notices for contracts subject to open international competitive procurement will be announced, as they become available, inUN Development Businessonline, on the World Bank&rsquo;s external website andMinistry of Finance websitewww.finance.gov.mvand national gazette of Maldives.&nbsp;</p><p>Interested eligible firms and individuals who would wish to be considered for the provision of goods, works, non-consulting services and consulting services for the above-mentioned project, or those requiring additional information, should contact the Borrower at the address below:&nbsp;</p><p>&nbsp;</p><p>Project Manager&nbsp;</p><p>Project Management Unit&nbsp;</p><p>National Centre for Information Technology (NCIT)&nbsp;</p><p>64, Kalaafaanu Hingun, Male&rsquo; 20064, Republic of Maldives&nbsp;</p><p>Tel: +(960)334-4000&nbsp;</p><p>Email:dmadd@ncit.gov.mv&nbsp;</p>"},{"id":"OP00215422","notice_type":"Request for Expression of Interest","noticedate":"20-Feb-2023","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2023-03-06T00:00:00Z","submission_deadline_time":"09:00","project_ctry_name":"Philippines","project_id":"P174066","project_name":"Beneficiary FIRST Social Protection Project","bid_reference_no":"PH-DSWD-318688-CS-QCBS","bid_description":"Development of the Crisis Intervention Service System","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","contact_address":"Batasan Pambansa Complex, Batasan Rd, Quezon City, 1100 Metro Manila","contact_ctry_name":"Philippines","contact_email":"cgmlagunday@dswd.gov.ph","contact_name":"Catherine Grace M.  Lagunday","contact_organization":"Department of Social Welfare and Development","contact_phone_no":"8952-68-34","contact_web_url":"https://www.dswd.gov.ph/","submission_date":"2023-02-20T00:00:00Z","notice_text":"<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST</strong></p><p><strong>(CONSULTING SERVICES &ndash; FIRMS SELECTION)</strong></p><p>&nbsp;</p><p><strong>Philippines Beneficiary FIRST Social Protection Project</strong></p><p><strong>Loan No.: LN 9168-PH</strong></p><p><strong>Assignment Title</strong>: <strong>Development of the Crisis Intervention Services System (CrISS)</strong></p><p><strong>Reference No</strong>. (as per Procurement Plan): <strong>23-</strong><strong>PH-DSWD-318688-CS-QCBS-001</strong></p><p>The Department of Social Welfare and Development (DSWD) &ndash; Central Office (CO) has received financing from the World Bank toward the cost of the Beneficiary FIRST Social Protection Project and intends to apply part of the proceeds for consulting services.&nbsp;</p><p>The consulting services (&ldquo;the Services&rdquo;) hiring is for the Development of the Crisis Intervention Services System (CrISS) that aims to improve and enhance the whole Assistance to Individuals in Crisis Situation (AICS) mechanism through automation with CrISS. &nbsp;The assignment duration will be 12 months. More details could be found in the attached Terms of Reference (TOR) for the assignment.&nbsp;</p><p>The DSWD now invites eligible consulting firms (&ldquo;Consultants&rdquo;) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:&nbsp;</p><ol><li>With at least five (5) years of experience (or a combination in case of a joint venture [JV] of firms) as an institution in the provision of strategic consulting assignments related to digital technologies, including progressive experience in any of the following areas:&nbsp; Electronic payment, Enterprise Architecture Consulting, Software as a Service (SaaS) consulting, Data Management, Business Process Reengineering, Strategy consulting and specifically designing digital transformation strategies and solutions.</li><li>With at least five (5) successfully completed design, development, and operational handover of detailed information system (preferably digital social protection delivery system) and related technical implementation documentation across a diverse set of geographies and industry sectors.</li><li>With at least three (3) (or a combination in case of a JV of firms) years of experience as an institution working with Government on design, development, and management of digital solutions, including across different administrative levels and sectors. Demonstrable knowledge of data governance, data interoperability, and data protection is an advantage.</li><li>Demonstrate that it has sufficient human resources, qualified and available to carry out the project.</li></ol><p>Key Experts will not be evaluated at the shortlisting stage.</p><p>The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; July 2016, revised November 2017 and August 2018 (&ldquo;Procurement Regulations&rdquo;), setting forth the World Bank&rsquo;s policy on conflict of interest.</p><p>Consultants may associate with other firms to enhance their qualifications but should <u>indicate clearly whether the association is in the form of</u> <u>a joint venture and/or a sub-consultancy</u>. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.</p><p>A Consultant will be selected in accordance with the Quality and Cost-based Selection (QCBS) method set out in the Procurement Regulations.</p><p>Further information can be obtained at the address below or during office hours<em> </em>8:00 am to 5:00 PM.</p><p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, by fax, or by e-mail) by <strong>06 March 2023 at 9:00 AM.</strong></p><p>&nbsp;</p><p><strong>THE CHAIRPERSON</strong></p><p>Bids and Awards Committee 2</p><p>c/o Bids and Awards Committee Secretariat</p><p>Administrative Service - Procurement Management Division</p><p>DSWD Central Office</p><p>IBP Road, Constitution Hills. Quezon City</p><p>Facsimile No.: (02) 951 7116</p><p>Telephone Nos.: (02) 931 8101 to 07 local nos. 122, 123 and 124</p><p>Email Address: quotations@dswd.gov.ph</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><em>(Original Signed)</em></p><p><strong>ATTY. MARCO M. BAUTISTA</strong></p><p>Undersecretary and Chairperson</p><p>Bids and Awards Committee 2</p><p>&nbsp;</p><p><strong>TERMS OF REFERENCE</strong></p><p>&nbsp;</p><p><strong>Development of the Crisis Intervention Services System (CrISS)</strong></p><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:564px\"><tbody><tr><td style=\"border-color:black; height:16.45pt; width:121.3pt\"><p><strong>TIMELINE</strong></p></td><td style=\"border-color:black; height:16.45pt; width:13.45pt\"><p>:</p></td><td style=\"border-color:black; height:16.45pt; width:288.25pt\"><p>Twelve Months (12 Months)</p></td></tr><tr><td style=\"border-color:black; height:27.4pt; width:121.3pt\"><p><strong>LOCATION</strong></p></td><td style=\"height:27.4pt; width:13.45pt\"><p>:</p></td><td style=\"height:27.4pt; width:288.25pt\"><p>Department of Social Welfare and Development (DSWD), Central Office, IBP Road, Quezon City</p></td></tr><tr><td style=\"border-color:black; height:29.2pt; width:121.3pt\"><p><strong>PROPONENT</strong></p></td><td style=\"height:29.2pt; width:13.45pt\"><p>:</p></td><td style=\"height:29.2pt; width:288.25pt\"><p>Program Management Bureau - Crisis Intervention Division (PMB-CID)</p></td></tr><tr><td style=\"border-color:black; height:32.8pt; width:121.3pt\"><p><strong>SOURCE OF FUNDS</strong></p></td><td style=\"height:32.8pt; width:13.45pt\"><p>:</p></td><td style=\"height:32.8pt; width:288.25pt\"><p>Beneficiary First Social Protection Project</p><p>(LN 9168-PH)</p></td></tr><tr><td style=\"border-color:black; height:17.5pt; width:121.3pt\"><p><strong>REFERENCE NO.</strong></p></td><td style=\"height:17.5pt; width:13.45pt\"><p>&nbsp;</p></td><td style=\"height:17.5pt; width:288.25pt\"><p>PH-DSWD-318688-CS-QCBS</p></td></tr></tbody></table><p>&nbsp;</p><p><strong>I. BACKGROUND</strong></p><p>The DSWD adopted the Performance Governance System (PGS) Pathway in pursuit of continued excellence as it relentlessly realizes its vision, fulfills its mandate, and exemplifies an improved quality of governance through its core values&mdash;Maagap at Mapagkalingang Serbisyo; Serbisyong Walang Puwang sa Katiwalian; at Patas na Pagtrato sa Komunidad.&nbsp; With a long-term goal, the DSWD, along with the PGS Pathways, aims to succeed in improving its service to the public with its Strategy Journey: &quot;Puso at Galing sa Serbisyo, Serbisyong Galing sa Puso.&quot;</p><p>To support the realization of its strategy, the Department is guided by Republic Act 11032 or the Ease of Doing Business and Efficient Government Service Delivery Act of 2018 which aims to streamline the current systems and procedures of government services. The law requires prompt action or resolution of all government transactions with efficiency. Consistent with the EODB law, the DSWD Strategy Map 2028 also established support to the development of the Department&rsquo;s Information Capital Roadmap with the theme &ldquo;Pagsulong ng Sistemang Digital, Pagsulong ng Kakayahang Teknikal&rdquo; to promote an informed and evidence-based decision-making through active utilization of credible and reliable information management systems. The Department&rsquo;s Monitoring and Evaluation is likewise strengthened with the theme &ldquo;Impormasyong Wasto at Husto, Pundasyon ng Maagap na Serbisyo,&rdquo;tion.</p><p>The Department&rsquo;s strategy is further supported under the Beneficiary FIRST (Fast, Innovative, and Responsive Service Transformation) Social Protection Project with funding support from World Bank for Short-Term IT systems development projects. The Beneficiary FIRST supports the development of information systems to automate the Assistance to Individuals in Crisis Situation (AICS).</p><p>The Assistance to Individuals in the Crisis Situation (AICS) program serves as a social safety net or a stop-gap mechanism to help individuals and families recover from unanticipated crises such as illness or loss of a family member, natural and man-made disasters, and other crisis circumstances. The national government, through its Crisis Intervention Units (CIUs) provides financial and material assistance for medical, burial, food, transportation, education, and other support services through the AICS program.</p><p>As of this writing, a total of 274[1] government offices are implementing the program nationwide. These offices are utilizing an information management system that stores data of clients availing services of the agency. The said system also allows the different offices to simultaneously access the information of clients seeking assistance to verify and crossmatch their identity.</p><p>However, the existing Information Communication Technology (ICT) equipment utilized by the program could no longer meet the demands of the increasing clientele of the program. Based on the inventory conducted by the PMB-CID Reporting Monitoring Team with the support from the Information Communication Technology and Management Service (ICTMS), it showed that there is insufficient ICT equipment and other ICT peripherals which are beyond its expected and reliable life span. This resulted in inefficiency in approaching the demand of the workload and the current software technology, which may cause, among others, breakdown of equipment that can result in data loss and hamper the CIU/S and SWAD Satellite operations.</p><p>Furthermore, the current information management system, namely the Crisis Intervention Monitoring System (CRIMS)[2], which supports the program implementation mechanism, is outdated in such a manner that the current functionalities of the CrIMS can no longer supplement the management&#39;s demand in implementing the AICS Program, which proved to have detrimental effects on the Ease of Doing Business (EODB) and Efficient Government Service Delivery. Below are the operational issues that have occurred in the day-to-day operation of the AICS Program.</p><table border=\"1\" cellspacing=\"0\" style=\"width:560px\"><tbody><tr><td style=\"background-color:white; border-color:black; height:14.75pt; width:206.25pt\"><p><strong>Operations-Related Issues</strong></p></td><td style=\"background-color:white; border-color:black; height:14.75pt; width:213.75pt\"><p><strong>CRIMS</strong></p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:206.25pt\"><p>Manual/Automated Queuing System</p></td><td style=\"vertical-align:top; width:213.75pt\"><p>No System Features Available</p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:206.25pt\"><p>The screening and assessment phase does not meet the existing standard operating procedure&#39;s minimum time constraints.</p></td><td style=\"vertical-align:top; width:213.75pt\"><p>Longer searching time in running client/ beneficiary record validation checks</p></td></tr><tr><td style=\"border-color:black; height:37.6pt; vertical-align:top; width:206.25pt\"><p>Delays in data submission, particularly in statistical and financial reporting,</p></td><td style=\"height:37.6pt; vertical-align:top; width:213.75pt\"><p>CIU/CIS/SWAD personnel experienced longer time required in the generation of report/s</p></td></tr><tr><td style=\"border-color:black; height:23.85pt; vertical-align:top; width:206.25pt\"><p>Referral Transactions to all other third parties such as the national, local agencies.</p></td><td style=\"height:23.85pt; vertical-align:top; width:213.75pt\"><p>No System Features Available</p></td></tr><tr><td style=\"border-color:black; height:22.4pt; vertical-align:top; width:206.25pt\"><p>No built-in monitoring system</p></td><td style=\"height:22.4pt; vertical-align:top; width:213.75pt\"><p>No System Features Available</p></td></tr><tr><td style=\"border-color:black; height:38.8pt; vertical-align:top; width:206.25pt\"><p>Manual Payments&#39; vulnerability to fraud risk</p></td><td style=\"height:38.8pt; vertical-align:top; width:213.75pt\"><p>No System Features Available</p></td></tr></tbody></table><p>Given such conditions, the program is rendered susceptible to fraud and erroneous entry of data and is experiencing difficulty in (a) identifying fraudulent documents; (b) double dipping/hopping; (c) duplication of identity (verification of identity); (d) system access issues due to slow internet connectivity; (e) delay in registering the referred clients/beneficiaries; (f) ensuring stable internet connections for satellite office access; (g) staffing (limited regular/permanents staff to facilitate the disbursement of financial assistance); (i) difficulty in making/producing Guarantee Letter (GL) due to different protocols/systems; and (j) quickly notifying the client that their GL was already approved and ready for pick-up. The high probability of these concerns affects the efficiency of the delivery of services. Hence, there is a need to digitize applicable processes to expedite the operational process of the program. More so, the Crisis Intervention has identified following functions and features as enhancements to the present system:</p><ol><li>Synchronization of client&rsquo;s records, particularly for those who submitted requirements online.</li><li>System administrator module that will set up and manage the user&rsquo;s access to various resources.</li><li>Avoid duplicate identity by introducing the Know Your Customer features through the use of authentication devices</li><li>An offline application of the system, which is linked to the online system and can support AICS implementation on content even when disconnected from the internet, is a quick, responsive, and productive information system.</li><li>An optimized auto search of referred client&rsquo;s information from the database.</li><li>Availability of remote assessment[3].</li><li>Modules for the disbursement of funds (liquidation and resource/budget monitoring system), payment through identified potential&nbsp;service providers e.g. Bank(s), Electronic Money Issuer(s) (EMIs), and Remittance Center(s), aiding the program in the distribution of assistance.</li><li>Automated and advanced dashboard reflecting reports (physical and financial accomplishments) with geotagging/georeferencing features that will monitor (i) Analysis of the areas affected by natural and human-induced disasters through mapping geotagged pictures and georeferencing that will enable the provision of AICS services and or relief to those individuals affected by the calamities and disasters; (ii) Generation of Dashboard with Client Category (Editable Sector Tagging (e.g. Fire Victims, Typhoon Victims E.g. Sub-sector: Typhoon Yolanda 2013)).</li><li>Electronic approval of the CIU/S, SWAD TL, and SDO, as deemed necessary to avoid delays and have documents approved quickly. .</li><li>Interoperability of the system with other information systems.</li><li>Online registration, appointments, and scheduling.</li><li>Document management system.</li><li>User management system.</li><li>Data Monitoring and reporting system.</li><li>Quick Response (QR) Code scanning feature for service providers to validate the authenticity of Guarantee Letters and certification of eligibility.</li></ol><p>Improving the productivity and quality of the services of the&nbsp; AICS program and its business processes through adapting to the digital transformation concept will further strengthen the implementation of the program through the capture and generation of reliable data and information for a more efficient and responsive delivery system. The following is a yearly breakdown of accomplishments:</p><table border=\"1\" cellspacing=\"0\" style=\"width:533px\"><tbody><tr><td style=\"background-color:#efefef; border-color:black; height:.7pt; width:169.5pt\"><p><strong>Year</strong></p></td><td style=\"background-color:#efefef; border-color:black; height:.7pt; width:230.0pt\"><p><strong>Total Number of Clients Served</strong></p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:169.5pt\"><p>2018</p></td><td style=\"width:230.0pt\"><p>834,762</p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:169.5pt\"><p>2019</p></td><td style=\"width:230.0pt\"><p>1,144,950</p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:169.5pt\"><p>2020</p></td><td style=\"width:230.0pt\"><p>1,224,270</p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:169.5pt\"><p>2021</p></td><td style=\"vertical-align:bottom; width:230.0pt\"><p>3,317,585</p></td></tr><tr><td style=\"border-color:black; vertical-align:top; width:169.5pt\"><p><strong>TOTAL</strong></p></td><td style=\"vertical-align:bottom; width:230.0pt\"><p><strong>6,521,567</strong></p></td></tr></tbody></table><p>&nbsp;</p><p><strong>The Department&rsquo;s Initiative to formulate several solutions to combat difficulties concerning the issues of the AICS Program</strong></p><p>Adding to the persistent challenges of the AICS program, the COVID-19 pandemic revealed that the implementation of DSWD&rsquo;s social protection programs needs to be improved (such as its business processes, information systems, and service delivery). Anchored on the priorities set forth in the Administrative Order 03 Series of 2020 or the DSWD COVID-19 Response and Recovery Plan 2020-2022, Special Order 2171 Series of 2020 was issued by the Secretary in July 2020 to create an Internal technical working group (TWG) to support the shift towards digital delivery of social protection programs. The CrISS has Two (2) of the four key result areas (KRAs): &nbsp;(i) shift to digital financial technology by leveraging the emerging experiences of digital government-to-person (G2P) payment and (ii) ICT upgrade and linkages through Philippine Identification System (PhilSys). The development of the CrISS has been identified as one of the projects to be supported by the BFIRST Project. The proposed automation with information system enhancement of the AICS program will support the shift towards digital solutions for the AICS program and minimize the existing manual operation.</p><p>&nbsp;</p><p>[1]1 Crisis Intervention Unit (CIU), 16 Crisis Intervention Section (CIS), 129 Social Welfare and Development (SWAD) satellite offices, and 151 Malasakit Centers</p><p>[2]CriMS is an Information system that is used to support the AICS Program&#39;s implementation. It is a web-based application used to manage and organizes AICS clients&#39; and beneficiaries&#39; data and information in order to create a centralized database, real-time encoding, and can produce interregional report generation in all Crisis Intervention Units/Sections and their respective SWAD Satellite Offices.</p><p>[3] The assessment process of the AICS program is done through the interview of the client by the assigned SWO. As a rule, the client is required to personally appear before the SWO to do the assessment but in view of the current quarantine protocols and under the &ldquo;new normal&rdquo; scenario, the SWO may opt to do the remote assessment through telephone, video conferencing and or other online platforms.</p><p>&nbsp;</p><p><strong>II. OBJECTIVE</strong></p><p>&nbsp;</p><p>The objective of the project is to hire a Software Development Firm (SDF) for the development of Crisis Intervention Services System[1] (CrISS) that aims to improve and enhance the whole AICS mechanism through automation. The CrISS aims to: 1) Introduce the browser-based approach for the registration and scheduling schemes; 2) Lessen, organize and shorten the mechanism of the scheduling; 3) Create an offline system that will be made available in CIU/CIS/SWAD and Malasakit Centers with unstable and/or unavailable internet connection; 4) Avoid duplicate identity by introducing the Electronic Know Your Customer (eKYC) features through the use of authentication systems and devices; 5) Create a platform in managing the disbursement procedure of the AICS Program. The CrISS shall be rolled out in DSWD Central Office, in all CIU/S of DSWD Regional Offices, SWAD Satellite Offices, and Malasakit Centers.</p><p>[1] The firm will work closely with the DSWD PMB-CID and ICTMS.</p><p>&nbsp;</p><p><strong>III. SCOPE OF SERVICES</strong></p><p>The project shall cover the development of the CrISS:</p><p><strong>A. CrISS Scope and Requirements</strong></p><p>This project covers the development of CrISS including the hardware, software, and support services that are necessary to achieve its objective. Annex A presents the detailed scope and requirements. Annex B shows the CrISS workflow.&nbsp;</p><p><strong>B. Minimum Viable Product (MVP)</strong></p><p>The DSWD Project Management Team will require the SDF to develop the CrISS priority modules using the Minimum Viable Product (MVP) approach. With the MVP, beneficiaries will quickly see the benefits of automating and reengineering the service delivery of the AICS Program in just three months. Additionally, the management and the SDF will iterate and improve the product or module under the MVP while piloting and implementing it.&nbsp;</p><p>The priority modules of the CrISS that the SDF needs to develop and implement through the MVP approach are as follows:</p><p>1. Online Registration and Appointment with Applicant deduplication (e-KYC);</p><p>2. Queuing Management System (QMS);</p><p>3. Electronic payment/e-wallet under the CrISS Client/Beneficiary Access module;</p><ul><li>can disburse to various Financial Service Provider (E.g. Banks, Electronic Money Issuers, and Remittance Centers) among others;</li><li>Releasing Officer Login/Access module</li><li>View, select, review transaction documents and update status of the transaction list;</li><li>Release assistance through e-payment;</li><li>Provide remarks/notification that will be inserted into the Short Message Service (SMS) as a message upon receiving assistance of the AICS Beneficiaries and clientele;</li></ul><p>4. Real-time disbursement reporting and dashboard;</p><p>5. Data Integration with current DSWD CRIMS;</p><p>6. Hardware, software, and required infrastructure will be provided by SDF for a period of one (1) year[1];</p><p>7. Deployment Services: The CrISS MVP will be deployed by the SDF once it has complied with the requirements for production deployment and is ready for production;</p><p>8. Pilot areas include Central Office, FOs NCR, 4A and 4B;</p><p>9. Development and implementation must be done within the 1st three (3) months of the project (The SDF must consider pilot testing of the MVP within three months).</p><p>[1] The SDF shall provide installation and configuration of the software including its delivery of the hardware and peripherals specifically (a) hardware: installing the Kiosk for the Queuing Management System and other support may needed for the other modules under the CrISS MVP; (b) Enable better system performance, safe and secure continuous operation by providing the CrISS MVP with Hybrid ICT infrastructure complements for one year.</p><p>&nbsp;</p><p><strong>IV. DELIVERABLES</strong></p><p>&nbsp;</p><p>The SDF shall deliver the following:</p><p>&nbsp;</p><p>&nbsp;</p><table align=\"center\" cellspacing=\"0\" style=\"width:611px\"><tbody><tr><td rowspan=\"2\" style=\"background-color:#d9d9d9; border-color:#4472c4; height:1.0pt; width:202.5pt\"><p><strong>Deliverables</strong></p></td><td colspan=\"12\" style=\"background-color:#d9d9d9; height:1.0pt; width:255.75pt\"><p><strong>Months</strong></p></td></tr><tr><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>1</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>2</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>3</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:19.5pt\"><p>4</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:16.5pt\"><p>5</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>6</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:28.5pt\"><p>7</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>8</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:18.0pt\"><p>9</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:28.5pt\"><p>10</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:26.25pt\"><p>11</p></td><td style=\"background-color:#d9d9d9; height:1.0pt; width:28.5pt\"><p>12</p></td></tr><tr><td style=\"height:29.1pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of Inception Report</p></td><td style=\"background-color:#aeaaaa; height:29.1pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:26.25pt\"><p>&nbsp;</p></td><td style=\"height:29.1pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of Report on the results of the business process review and requirements analysis</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:26.25pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of System Architecture, BPRA Document, System Design (Wireframe, use case), and Implementation Plan</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:26.25pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of Privacy Impact Assessment Report and OR System Data Protection and Security Report</p><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:26.25pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>Agile weekly status report and a three month production release cycle for MVP: System Version; Completed/Developed CrISS Modules; System Integration (Functional System)</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:19.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:16.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:26.25pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:39.75pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of Various Documents and References:</p><ul><li>Record of Technical &amp; Business tests</li><li>Accomplished Testing Tools</li><li>Report on Test Results Accepted by the Business Owner</li><li>Report on deployment results</li><li>List of users with their respective accounts</li><li>User Acceptance Test</li><li>Hardware configuration and test procedures</li></ul></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:39.75pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:39.75pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:39.75pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of accessible link for the production state CrISS</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:69.7pt; vertical-align:top; width:202.5pt\"><p>Must ensure compliance with SLA on system maintenance for bugs, errors, and glitches encountered during system operation and deployment.</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:69.7pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:69.7pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:69.7pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>Document: Report on issues and concerns; record of monitoring and maintenance services and SLA accepted and approved by the Business Owner.</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:28.5pt\"><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>Document: Complete User Training Design and Documentation approved and accepted by the Business Owner and ICTMS</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>SDF Submission and DSWD Acceptance of Training Needs Assessment Report</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"background-color:white; height:1.0pt; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>Learning and Development Interventions (LDI) Design for System Users, and Administrators, and Regional IT Officers.</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:1.0pt; vertical-align:top; width:202.5pt\"><p>Project documentation, user manual, and Reports;</p><p>Documentation of Completed Learning and Development Interventions (LDIs)</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:1.0pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:1.0pt; width:28.5pt\"><p>&nbsp;</p></td></tr><tr><td style=\"height:53.25pt; vertical-align:top; width:202.5pt\"><p>Technical System Documentation, Installation Guide, and system administration manual, Troubleshooting Guide, User Manual</p><p>Complete System Documentation (Define specific documents, source code (e-copy) etc.)&nbsp;</p><p>&nbsp;</p><p>Sign Off Document</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:19.5pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:16.5pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:18.0pt\"><p>&nbsp;</p></td><td style=\"height:53.25pt; vertical-align:top; width:28.5pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:53.25pt; width:26.25pt\"><p>&nbsp;</p></td><td style=\"background-color:#aeaaaa; height:53.25pt; width:28.5pt\"><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>The SDF shall develop the CrISS in line with the scope and deliverables outlined in this terms of reference. The solutions/information systems/applications are expected to be delivered within twelve (12) months for the whole project duration.</p><p><strong>V. QUALIFICATIONS</strong></p><p>A. Minimum Qualifications and Experience of the Consulting Firm</p><ol><li>With at least five (5) years of experience (or a combination in case of a Joint Venture (JV) of firms) as an institution in the provision of strategic consulting assignments related to digital technologies, including progressive experience in any of the following areas:&nbsp; Electronic payment, Enterprise Architecture Consulting, Software as a Service (SaaS) consulting, Data Management, Business Process Reengineering, Strategy consulting and specifically designing digital transformation strategies and solutions.</li><li>With at least five (5) successfully completed design, development, and operational handover of detailed information system (preferably digital social protection delivery system) and related technical implementation documentation across a diverse set of geographies and industry sectors.</li><li>With at least three (3) (or a combination in case of a JV of firms) years of experience as an institution working with Government on design, development, and management of digital solutions, including across different administrative levels and sectors. Demonstrable knowledge of data governance, data interoperability, and data protection is an advantage.</li><li>Demonstrate that it has sufficient human resources, qualified and available to carry out the project.</li></ol><p>B. Minimum Qualifications and Experience of the Key Experts (KE) and Project Team Lead and Members</p><ol><li>Possesses a Bachelor&rsquo;s Degree in any Computer/IT-related courses (e.g. Computer Science/Programming, IT), preferably with a master&rsquo;s degree or higher, in a relevant area (e.g. Computer Science/Programming, IT), or related industry certifications.</li><li>With at least five (5) years of experience in Project Management in delivering ICT and software design, development, and integration services to any government agency.</li><li>Knowledge in using PHP, HTML, CSS, JavaScript, Vue.js, Node.js, Express.js, Flutter, SQL, NGINX and Software Development Frameworks</li></ol><p>&nbsp;</p><table border=\"1\" cellspacing=\"0\" style=\"width:517px\"><tbody><tr><td style=\"background-color:#cccccc; border-color:black; height:19.05pt; width:99.5pt\"><p><strong>ROLE</strong></p></td><td style=\"background-color:#cccccc; border-color:black; height:19.05pt; width:162.5pt\"><p><strong>RESPONSIBILITY</strong></p></td><td style=\"background-color:#cccccc; border-color:black; height:19.05pt; width:125.5pt\"><p><strong>SKILLS &amp; COMPETENCIES</strong></p></td></tr><tr><td style=\"border-color:black; height:183.0pt; vertical-align:top; width:99.5pt\"><p>Team Lead &ndash; Project Manager (Key expert) (1)</p></td><td style=\"height:183.0pt; vertical-align:top; width:162.5pt\"><ul><li>Leading the Team from the front and provide the necessary support to Web Developers for the development of the solution/ information system&nbsp;</li><li>Liaise with DSWD for any project management issues and concerns</li></ul></td><td style=\"height:183.0pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in information technology or computer science or related field</li><li>Minimum of three (3) years of experience in web-development (front-end and backend development), database management, and project management, coordination, communication and team handling.</li></ul></td></tr><tr><td style=\"border-color:black; height:21.0pt; vertical-align:top; width:99.5pt\"><p>System and Applications Architect (Key expert) (2)</p></td><td style=\"height:21.0pt; vertical-align:top; width:162.5pt\"><ul><li>Responsible for Technical design</li><li>Prepare Technical Design document (TD) &amp; guide the Technical Lead</li><li>Lead the development and delivery of business applications</li></ul></td><td style=\"height:21.0pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in Information Technology or Computer Science</li><li>Minimum of 3 years of experience in designing &amp; architecting web based application, database management, and project management</li><li>Technical background and experience in systems development</li><li>Knowledge in IT architecture, infrastructure, cloud development, data modeling, and understanding of frameworks</li><li>Experience using the Git versioning system.</li><li>Experience in Scrum/Agile environments</li><li>Requirements analysis and management</li><li>The ability to visualize complex issues</li><li>The ability to communicate across communities</li><li>The ability to understand boundaries</li><li>Analytic and Creative problem solving skills</li></ul></td></tr><tr><td style=\"border-color:black; height:161.25pt; vertical-align:top; width:99.5pt\"><p>Business Analyst (Key expert)</p></td><td style=\"height:161.25pt; vertical-align:top; width:162.5pt\"><ul><li>Ongoing requirement gathering/elaboration and Coordination during the whole Project</li><li>Act as the primary coordinator between the Delivery team and DSWD Project coordinators on technical requirements</li><li>Helps/support in UAT and liaising with business users during UAT phase</li></ul></td><td style=\"height:161.25pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor degree in Information Technology or computer science or related field</li><li>Minimum of three (3) years of experience in requirements gathering, business documentation and project communication</li></ul></td></tr><tr><td style=\"border-color:black; height:7.95pt; vertical-align:top; width:99.5pt\"><p>Business Analyst (Key expert)</p></td><td style=\"height:7.95pt; vertical-align:top; width:162.5pt\"><ul><li>Responsible for implementing design specifications and document to the code base</li><li>Performs unit testing and participates in code walkthrough</li><li>Prepares program specifications or component specifications</li><li>Performs knowledge transfer sessions to DSWD</li></ul></td><td style=\"height:7.95pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s&nbsp; degree in information technology or computer science or related field/technology. Certification is a plus. Masters degree in related fields is a plus.</li><li>Minimum of four (4) years of experience in systems development</li><li>Knowledge in IT architecture, infrastructure, cloud development, data modeling, and understanding of frameworks</li><li>Experience using the Git versioning system.</li><li>Experience in Scrum/Agile environments</li><li>Requirements analysis and management</li><li>Work closely with other staff, such as project managers and systems analysts.</li><li>Have knowledge of preparing HLDs and LLDs</li><li>Experience in web-development using PHP, CodeIgniter Framework, MySQL</li></ul></td></tr><tr><td style=\"border-color:black; height:228.7pt; vertical-align:top; width:99.5pt\"><p>Junior Software Developer (Key expert)</p></td><td style=\"height:228.7pt; vertical-align:top; width:162.5pt\"><ul><li>API Development &amp; manage database model for the solution/ information system/ application&nbsp;</li><li>Development and deployment of the solution/ information system/ application features/functionalities and works under Technical Lead</li></ul></td><td style=\"height:228.7pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in information technology or computer science or related field/technology certification is a plus. Masters degree in related fields is a plus</li><li>A minimum of 3 years of progressively responsible experience in web-development (front-end and backend development), team player</li><li>Experience in web-development using PHP, CodeIgniter Framework, MySQL</li></ul></td></tr><tr><td style=\"border-color:black; height:228.7pt; vertical-align:top; width:99.5pt\"><p>Quality Analyst (Key expert)</p></td><td style=\"height:228.7pt; vertical-align:top; width:162.5pt\"><ul><li>Create and Review Functional test scripts</li><li>Create and Review Functional test data and unit test results.</li><li>Prepare the test Plan</li><li>Prepare the Integration Test Scripts</li><li>Execute integration tests</li><li>Execute smoke tests &amp; regression tests</li><li>Execute operational acceptance test</li><li>Document test cases</li><li>Develop standards and procedures to determine product quality and release readiness</li><li>Drive innovation and streamline overall testing processes</li><li>Identify, isolate, and track bugs throughout testing</li><li>Research new tools, technologies, and testing processes</li><li>Review user interfaces for consistency and functionality</li></ul></td><td style=\"height:228.7pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in Information Technology or Computer Science or related field/QA certification is a plus. Master&rsquo;s degree in related fields is a plus</li><li>A minimum of three (3) years of progressively responsible experience in manual testing</li><li>Test design techniques</li><li>Defect management process</li><li>Knowledge of the business domain</li><li>Experience in a variety of testing efforts</li><li>Understanding of common software failures and faults</li><li>Knowledge of the system or application-under-test</li><li>Knowledge of the test automation process</li><li>Knowledge of the system or application-under-test</li></ul></td></tr><tr><td style=\"border-color:black; height:97.5pt; vertical-align:top; width:99.5pt\"><p>UI/UX Expert (Key expert)</p></td><td style=\"height:97.5pt; vertical-align:top; width:162.5pt\"><ul><li>Understand the usability requirements, branding, and marketing aspects</li><li>Define UX as per the requirement, create IA &amp; Wireframes</li><li>Responsible for setting visual language for the application</li><li>&nbsp;Gather and evaluate user requirements in collaboration with product managers and engineers</li><li>Illustrate design ideas using storyboards, process flows and sitemaps</li><li>Design graphic user interface elements, like menus, tabs and widgets</li><li>Build page navigations</li><li>Develop UI mockups and prototypes that clearly illustrate how sites function and look like</li><li>Follow the required UI guideline for respective device</li><li>Identify and troubleshoot UX problems (e.g. responsiveness)</li><li>Conduct layout adjustments based on user feedback</li><li>Adhere to style, standards and branding guidelines on fonts, colors and images</li><li>Guide the programming team on other HCI (Human Computer Interaction) issues</li></ul></td><td style=\"height:97.5pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in Design or equivalent professional experience.</li><li>Three (3) + years of related experience designing wireframes and high-fidelity comprehensive mockups for web &amp; mobile platforms, custom applications, user interface controls, data visualizations, using tools such as Sketch, Figma, InVision or Adobe creative suite (Photoshop, Illustrator, etc.)</li><li>Three (3) + years of experience applying human centered design research methodologies.</li><li>Three (3) + years web design experience in a large corporate or non-profit setting.</li><li>Deep understanding and practical hands on applying usability, user experience and user centered design concepts.</li><li>Experience in extracting requirements and designing complex solutions based on fuzzy user requirements.</li></ul></td></tr><tr><td style=\"border-color:black; height:1.15pt; vertical-align:top; width:99.5pt\"><p>Training Specialist</p></td><td style=\"height:1.15pt; vertical-align:top; width:162.5pt\"><ul><li>Develop training design for the conduct of Learning and Development Intervention (LDI) for users</li><li>Implement LDI and submit documentation reports on completed LDIs</li></ul></td><td style=\"height:1.15pt; vertical-align:top; width:125.5pt\"><ul><li>Bachelor&rsquo;s degree in social sciences or related disciplines</li><li>At least 5 years of experience in education and related sector</li><li>Work experience in conducting trainings for the government staff is a plus</li></ul><p>&nbsp;</p></td></tr></tbody></table><p>&nbsp;</p><p>C. Reporting and Working Arrangements</p><p>&nbsp;</p><p>The SDF shall report directly to ICTMS and will work closely with the PMB-CID as business owner. A DSWD Project Management Team for the Development of CrISS will also be created to support the SDF. Attached as Annex is the institutional arrangements.</p><p>&nbsp;</p><p>While the location of the consultant team may be flexible at different times of the project, it is expected that the majority of consultancy work and activities will be conducted in Quezon City and with the DSWD project personnel, given that the engagement with business owners and stakeholders is critical to the successful delivery of outputs and the project&rsquo;s scope of work and requirements.</p>"}]}