{"rows":10,"os":"0","page":"1","total":"1","procnotices":[{"id":"OP00473668","notice_type":"Invitation for Bids","noticedate":"07-Oct-2026","notice_lang_name":"English","notice_status":"Published","submission_deadline_date":"2026-11-17T00:00:00Z","submission_deadline_time":"10:00","project_ctry_name":"Ghana","project_id":"P164330","project_name":"Greater Accra Resilient and Integrated Development Project","bid_reference_no":"GH-MWH-219663-CW-RFB","bid_description":"Reconstruction of Abbosey Okai Bridge","procurement_group":"CW","procurement_method_code":"RFB","procurement_method_name":"Request for Bids","contact_address":"Ministries\nAccra","contact_ctry_name":"Ghana","contact_email":"oksarfoh@gmail.com","contact_name":"Ohene Sarfo","contact_organization":"Ministry of Works, Housing and Water Resources","contact_phone_no":"0246489796","submission_date":"2026-10-07T00:00:00Z","notice_text":"<p><strong>SPECIFIC PROCUREMENT NOTICE</strong></p><p>&nbsp;</p><p><strong>Invitation for Bids (IFB)</strong></p><p>&nbsp;</p><p><strong>Project: Greater Accra<em> </em>Resilient and Integrated Development Project </strong></p><p><strong>Contract title: Reconstruction of Abbosey Okai Bridge </strong></p><p><strong>Country: Ghana</strong></p><p><strong>Credit No.:</strong><em> </em><strong>IDA-64100</strong></p><p><strong>RFB No: GH-MWH-219663-CW-RFB</strong></p><p><strong>Issued on: October 14, 2026</strong></p><ol><li>The <strong>Government of Ghana has received</strong><em> </em>financing from the World Bank toward the cost of the <strong>Greater Accra Resilient and Integrated Development Project</strong> and intends to apply part of the proceeds toward payments under the contract for <strong>Reconstruction of Abbosey Okai bridge</strong>.<em> </em>For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank&rsquo;s Disbursement Guidelines for Investment Project Financing.</li><li>The Ministry of Works, Housing and Water Resources invites sealed bids from eligible contractors for the <strong>Reconstruction of the Abbosey Okai Bridge</strong>. The project involves the demolition of the existing concrete arch bridge, approximately 47.5m long and 15.0m wide, which currently spans over the Odaw River. The existing structure is in a deteriorated condition, with visible concrete cover detachment, oxidized reinforcing steel bars, and vertical misalignment of the paving surface.</li></ol><p>&nbsp;</p><p>The new bridge structure to be constructed consists of a <strong>47.5m single-span deck</strong>, made of <strong>COR-TEN steel beams</strong> and <strong>reinforced concrete slabs</strong>, supported by <strong>reinforced concrete abutments with pile foundations</strong>. The bridge will have sixteen HL 1100 M (S460) steel beams, spaced at 0.95m, with a reinforced concrete slab (C40/50) placed on top. The abutments will be 6.50m high, 16.20m long, and 2.20m thick, with 24 reinforced concrete piles (diameter 1.20m, depth 25m) ensuring structural stability.</p><p>&nbsp;</p><p>The project also includes the <strong>elevation and reinstatement of the approach roads</strong> and surrounding areas affected by the bridge replacement. The existing vertical clearance of the bridge will be increased, preventing frequent submergence during floods. The bridge deck width will be maintained at 15m to guarantee continuity with the existing roadway.</p><p>&nbsp;</p><p>Additional works involve <strong>jet grouting consolidation</strong> at the abutments, with 130 jet grouting columns per abutment, extending 15m below the foundation slab, to mitigate soil liquefaction risks. Drainage modifications include DIA150mm pipes discharging rainwater directly into the river and covered side drains connecting to the existing drainage system. <strong>Traffic management and road diversions</strong> during construction will be a very critical aspect of works, considering the highly congested area where the new bridge has to be located.</p><p>The contract shall be executed within <strong>9 months</strong>.</p><p>&nbsp;</p><ol><li>Bidding will be conducted through <strong>National</strong><strong> Competitive Procurement</strong> using Request for Bids (RFB) as specified in the World Bank&rsquo;s &ldquo;Procurement Regulations for IPF Borrowers&rdquo; 7th Edition September, 2025 (Procurement Regulations), and is open to all eligible Bidders as defined in the Procurement Regulations.</li><li>Interested eligible Bidders may obtain further information from the Ministry of Works and Housing, <strong>Mr. Daniel Kusi, email: dkojokusi@gmail.com</strong> and inspect the Bidding document during office hours <strong>(9:00 Hrs GMT-16:00 Hrs GMT)</strong> at the address <strong>(2)</strong> given below.</li><li>The Bidding document in <strong>English</strong> may be purchased by interested eligible Bidders upon the submission of a written application to the address <strong>(1)</strong> below and upon payment of a nonrefundable fee of <strong>GH&cent; 2,000.00 (Two Thousand Ghana Cedis)</strong> <strong>or in a freely convertible currency</strong>. The method of payment will be <strong>cash.</strong> The document will be sent by Courier at an additional cost of GHC 100.00<strong>.</strong></li><li>Bids must be delivered to the address <strong>(3)</strong> below on or before <strong>10:00 HRS GMT on November 17, 2026.</strong> Electronic Bidding <strong>will not</strong> be permitted. Late Bids will be rejected. Bids will be publicly opened in the presence of the Bidders&rsquo; designated representatives and anyone who chooses to attend at the address (3) below on <strong>on November 17, 2026 at 10:00 HRS GMT</strong><em>.</em></li><li>All bids must be accompanied by a bid security of <strong>GH&cent;</strong><strong> </strong><strong>1,500,000.00</strong> from a reputable bank.</li><li>All Bids must be accompanied by a Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH) Declaration.</li><li>Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder&rsquo;s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.</li><li>The addresses referred to above are:</li></ol><p>Address (1): inspection and purchase:</p><p><strong>Name of Office</strong>: Ministry of Works, Housing and Water Resources</p><p><strong>Street Address</strong>: Ministries, Accra</p><p><strong>Floor/Room Number</strong>: Ground Floor, Procurement Unit, Room G09,</p><p><strong>City</strong>: Accra</p><p><strong>Region</strong>: Greater Accra</p><p><strong>Country</strong>: Ghana</p><p><strong>Email Address</strong>: dkojokusi@gmail.com</p><p><strong>Attention</strong>: Senior Procurement Manager, GARID</p><p>Address (2): For Clarifications:</p><p><strong>Name of Office</strong>: Ministry of Works, Housing and Water Resources</p><p><strong>Street Address</strong>: Ministries, Accra. P.O. Box M43, Accra.</p><p><strong>Floor/Room Number</strong>: 2nd Floor / R.202</p><p><strong>City</strong>: Accra</p><p><strong>Region</strong>: Greater Accra</p><p><strong>Country</strong>: Ghana</p><p><strong>Email Address</strong>: tenders@garid-accra.com</p><p>Address (3): For bid submission and opening:</p><p><strong>Name of Office</strong>: Ministry of Works, Housing and Water Resources</p><p><strong>Street Address</strong>: No. 3 Valco Drive, Ministries, Accra</p><p><strong>Floor/Room Number</strong>: 3rd Floor / R.308 Conference Room</p><p><strong>City</strong>: Accra</p><p><strong>Region</strong>: Greater Accra</p><p><strong>Country</strong>: Ghana</p>"}]}