{"rows":10,"os":"0","page":"1","total":"1","procnotices":[{"id":"OP00472616","notice_type":"Contract Award","noticedate":"02-Oct-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Philippines","project_id":"P513007","project_name":"Bangsamoro Camps Transformation Project Phase 2","bid_reference_no":"BCTP2-RF-BHS-CBI-01","bid_description":"Provision of Labor for  the Repair and/or Retro-fitting of BHS  at camp BILAL","procurement_group":"CW","procurement_method_code":"RFQ","procurement_method_name":"Request for Quotations","submission_date":"2026-10-02T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P513007-Bangsamoro Camps Transformation Project Phase 2<br/><b>Loan/Credit/TF Info:</b>TF-D0501<br/><b>Bid/Contract Reference No:</b>BCTP2-RF-BHS-CBI-01<br/><b>Procurement Method:</b>RFQ-Request for Quotations<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Repair Materials for the BHS in Barangay Tamparan, Munai, Lanao del Norte, Camp Bilal</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/09/23<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>2 Month(s)<br/></div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Bidder(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='col-sm-5'><div class='row col-sm-12'><b>NEW 3FLOWERS INC. (1132106)</b><br/>MBBL Corporation Building, Purok 3 Poblacion Linamon, Lanao del Norte<br/>Country: Philippines<br/></br></div></div><div class='col-sm-7'><div class='row col-sm-12'>Bid Price at Opening<br/>PHP 28455.00<br/><br/>Evaluated Bid Price<br/>PHP 28455.00</div></br></div><div class='col-sm-5'></div><div class='col-sm-7'>Signed Contract price<br/>PHP 28455.00</div><br/></div></div>"}]}