{"rows":10,"os":"0","page":"1","total":"1","procnotices":[{"id":"OP00467695","notice_type":"Contract Award","noticedate":"08-Sep-2026","notice_lang_name":"Spanish; Castilian","notice_status":"Published","project_ctry_name":"Peru","project_id":"P174812","project_name":"Transmission Investment Plan (PIT) to support Post-COVID-19 Green Economic Recovery in Peru","bid_reference_no":"PE-MINEM/DGER-463365-CS-QCBS","bid_description":"Supervisión de la Ampliación de potencia de la subestación de transmisión de Moyobamba","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","submission_date":"2026-09-08T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P174812-Transmission Investment Plan (PIT) to support Post-COVID-19 Green Economic Recovery in Peru<br/><b>Loan/Credit/TF Info:</b>IBRD-92880<br/><b>Bid/Contract Reference No:</b>PE-MINEM/DGER-463365-CS-QCBS<br/><b>Procurement Method:</b>QCBS-Seleccin basada en calidad y costo<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Supervisin de la Ampliacin de potencia de la subestacin de transmisin de Moyobamba</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/02/22<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>420 Day(s)<br/></div><div class='col-sm-4'><b>Minimum Qualifying Score</b><br/><br/>80</div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Firm(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='row col-sm-12'><div class='col-sm-6'><b>ACI PROYECTOS S.A.S. SUCURSAL DEL PERU (1035997)</b><br/>AV. BENAVIDES NRO. 1555 INT. 703 (EDIFICIO DELPARK)  MIRAFLORES<br/>Country: Per<br/>Registry ID: 20492307298<br/></div></div><br/><div class='col-sm-6'><b>Scores</b><table width='100%'><tbody><tr><td colspan='2' width='50%'>Technical:</td><td width='30%'>97.00</td></tr><tr><td></td><td>Methodology:</td><td>19</td></tr><tr><td></td><td>Key Personnel:</td><td>78</td></tr><tr><td colspan='2'>Financial:</td><td>100</td></tr><tr><td colspan='2'>Combined:</td><td>97.60</td></tr><tr><td colspan='2'>Rank:</td><td>1</td></tr></tbody></table></div><div class='col-sm-6'><p></p><b>Final Evaluation Price</b><br/>PEN 1638608.60<br/><p></p><b>Signed Contract Price</b><br/>PEN 1547881.06</div><div class='row col-sm-12'><div class='col-xs-12'><b>Price:</b><br/></div></div><div class='row col-sm-12'><div class='col-xs-4'>Currency:</div><div class='col-xs-4'>Amount:</div></div><div class='row col-sm-12'><div class='col-xs-4'>Nuevo sol (Per) (Nuevo sol (Per))</div><div class='col-xs-4'>1547881.06</div></div></div><div class='spacing'></div><div class='spacing'></div></div><div class='row'><div class='col-sm-12'><u><b>Evaluated Firm(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='row col-sm-12'><div class='col-sm-6'><b>SERVICIOS DE INGENIERIA INTEGRAL S.A.C. (985846)</b><br/>Country: Per<br/></div></div><br/><div class='row col-sm-12'><div class='col-sm-6'><b>CAOLLANKAY S.A.C. (1037843)</b><br/>Country: Per<br/></div></div><br/><div class='col-sm-6'><table width='100%'><tbody></tbody></table></div><div class='col-sm-6'><p></p><b>Final Evaluation Price</b><br/>PEN 2831688.61<br/></div><div class='row col-sm-12'><div class='col-xs-12'><b>Price:</b><br/></div></div><div class='row col-sm-12'><div class='col-xs-4'>Currency:</div><div class='col-xs-4'>Amount:</div></div></div><div class='spacing'></div><div class='spacing'></div></div>"}]}