{"rows":10,"os":"0","page":"1","total":"1","procnotices":[{"id":"OP00467682","notice_type":"Contract Award","noticedate":"08-Sep-2026","notice_lang_name":"English","notice_status":"Published","project_ctry_name":"Mozambique","project_id":"P175266","project_name":"Mozambique Northern Urban Development Project","bid_reference_no":"37/CS/PDUNM-C1-C2/QCBS/23","bid_description":"Elaboration of specific Environmental And Social Instruments for Cabo-Delgado Province","procurement_group":"CS","procurement_method_code":"QCBS","procurement_method_name":"Quality And Cost-Based Selection","submission_date":"2026-09-08T00:00:00Z","notice_text":"<div class='row col-sm-12'><h4>Contract Award</h4><p><b>Project:</b>P175266-Mozambique Northern Urban Development Project<br/><b>Loan/Credit/TF Info:</b>IDA-D9430<br/><b>Bid/Contract Reference No:</b>37/CS/PDUNM-C1-C2/QCBS/23<br/><b>Procurement Method:</b>QCBS-Quality And Cost-Based Selection<br/><b>Scope of Contract:</b><span class='desc-word-wrap'>Consulting Services for Development of Specific Environmental and Social Tools for Cabo Delgado Province</span><br/><b>Notice Version No:</b>0</p><br/></div><div class='row'><div class='col-sm-4'><b>Date Notification of Award Issued</b><br/>(YYYY/MM/DD)<br/>2026/09/08<br/></div><div class='col-sm-4'><b>Duration of Contract</b><br/><br/>9 Month(s)<br/></div><div class='col-sm-4'><b>Minimum Qualifying Score</b><br/><br/>75</div></div><div class='spacing'></div><div class='spacing'></div><div class='row'><div class='col-sm-12'><u><b>Awarded Firm(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='row col-sm-12'><div class='col-sm-6'><b>CONSULTEC - CONSULTORES ASSOCIADOS LDA (328727)</b><br/>Neighborhood of Sommerchield, Number 169th, Paved Road<br/>Country: Mozambique<br/></div></div><br/><div class='col-sm-12'><b>Beneficial Ownership Details</b><br/>Form Date: 15-APR-25<br/><div class='table-responsive'><table class='table table-info fixedLayout'><thead><tr><th width='25%'><b>Name</b></th><th width='15%'><b>Nationality</b></th><th width='15%'><b>Residence Country</b></th><th width='45%'><b>Conditions Met</b></th></tr></thead><tbody><tr><td>Luis Luis da Rocha Lobo</td><td>MZ</td><td>Mozambique</td><td>Directly or indirectly holding 25 % or more of the Voting Rights</td></tr></tbody></table></div></div><br/><div class='col-sm-6'><b>Scores</b><table width='100%'><tbody><tr><td colspan='2' width='50%'>Technical:</td><td width='30%'>84.41</td></tr><tr><td width='10%'></td><td>Consultant Specific Experience:</td><td>9.5</td></tr><tr><td></td><td>Methodology:</td><td>19.16</td></tr><tr><td></td><td>Key Personnel:</td><td>50.75</td></tr><tr><td></td><td>Participation by Nationals:</td><td>5</td></tr><tr><td colspan='2'>Financial:</td><td>100</td></tr><tr><td colspan='2'>Combined:</td><td>87</td></tr><tr><td colspan='2'>Rank:</td><td>1</td></tr></tbody></table></div><div class='col-sm-6'><p></p><b>Final Evaluation Price</b><br/>USD 43897293.98<br/><p></p><b>Signed Contract Price</b><br/>MZN 43897293.98</div><div class='row col-sm-12'><div class='col-xs-12'><b>Price:</b><br/></div></div><div class='row col-sm-12'><div class='col-xs-4'>Currency:</div><div class='col-xs-4'>Amount:</div></div><div class='row col-sm-12'><div class='col-xs-4'>New Mozambique Metical (New Mozambique Metical)</div><div class='col-xs-4'>43897293.98</div></div></div><div class='spacing'></div><div class='spacing'></div></div><div class='row'><div class='col-sm-12'><u><b>Rejected Firm(s):</b></u></div><div class='spacing'></div><div class='spacing'></div><div class='row col-sm-12'><div class='row col-sm-12'><div class='col-sm-6'><b>DELCAM CONSULTORIA E SERVICOS LDA (636586)</b><br/>Country: Mozambique<br/></div></div><br/><div class='row col-sm-12'><div class='col-sm-6'><b>NSOVO ENVIRNOMENTAL CONSULTANT (834404)</b><br/>Country: South Africa<br/></div></div><br/><div class='col-sm-6'><table width='100%'><tbody></tbody></table></div><div class='col-sm-6'><p></p><b>Final Evaluation Price</b><br/><p></p><b>Reason for Rejection</b><br/>Failure to meet minimum technical score</div><div class='row col-sm-12'><div class='col-xs-12'><b>Price:</b><br/></div></div><div class='row col-sm-12'><div class='col-xs-4'>Currency:</div><div class='col-xs-4'>Amount:</div></div></div><div class='spacing'></div><div class='spacing'></div></div>"}]}